Science.gov

Sample records for 12-1-05 final dclg

  1. Final Report

    SciTech Connect

    DeTar, Carleton

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  2. Final Report

    SciTech Connect

    Gurney, Kevin R

    2015-01-12

    This document constitutes the final report under DOE grant DE-FG-08ER64649. The organization of this document is as follows: first, I will review the original scope of the proposed research. Second, I will present the current draft of a paper nearing submission to Nature Climate Change on the initial results of this funded effort. Finally, I will present the last phase of the research under this grant which has supported a Ph.D. student. To that end, I will present the graduate student’s proposed research, a portion of which is completed and reflected in the paper nearing submission. This final work phase will be completed in the next 12 months. This final workphase will likely result in 1-2 additional publications and we consider the results (as exemplified by the current paper) high quality. The continuing results will acknowledge the funding provided by DOE grant DE-FG-08ER64649.

  3. Final Words

    ERIC Educational Resources Information Center

    Bers, Trudy

    2012-01-01

    This final chapter provides observations about institutional research in community colleges derived from the preceding chapters and the issue editors' own experiences. Taken as a whole, the chapters in this issue, as well as the editors' experiences, suggest several observations about institutional research in community colleges. These include the…

  4. Final Report

    SciTech Connect

    R. Paul Drake

    2001-11-30

    This final report describes work involving 22 investigators from 11 institutions to explore the dynamics present in supernova explosions by means of experiments on the Omega laser. The specific experiments emphasized involved the unstable expansion of a spherical capsule and the coupling of perturbations at a first interface to a second interface by means of a strong shock. Both effects are present in supernovae. The experiments were performed at Omega and the computer simulations were undertaken at several institutions. B139

  5. Final Report

    SciTech Connect

    Marchant, Gary E.

    2013-04-23

    This is the final report of a two year project entitled "Governing Nanotechnology Risks and Benefits in the Transition to Regulation: Innovative Public and Private Approaches." This project examined the role of new governance or "soft law" mechanisms such as codes of conduct, voluntary programs and partnership agreements to manage the risks of emerging technologies such as nanotechnology. A series of published or in publication papers and book chapters are attached.

  6. Final Report

    SciTech Connect

    R Paul Drake

    2004-01-12

    OAK-B135 This is the final report from the project Hydrodynamics by High-Energy-Density Plasma Flow and Hydrodynamics and Radiation Hydrodynamics with Astrophysical Applications. This project supported a group at the University of Michigan in the invention, design, performance, and analysis of experiments using high-energy-density research facilities. The experiments explored compressible nonlinear hydrodynamics, in particular at decelerating interfaces, and the radiation hydrodynamics of strong shock waves. It has application to supernovae, astrophysical jets, shock-cloud interactions, and radiative shock waves.

  7. Final Report

    SciTech Connect

    Webb, Robert C.; Kamon, Teruki; Toback, David; Safonov, Alexei; Dutta, Bhaskar; Dimitri, Nanopoulos; Pope, Christopher; White, James

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  8. Final Report

    SciTech Connect

    Wessels, B. W.

    2002-08-02

    Final report for program on the study of structure and properties of epitaxial oxide films. The defect structure of epitaxial oxide thin films was investigated. Both binary and complex oxides were studied. Epitaxial oxides were synthesized by organometallic chemical vapor deposition (OMCVD). This technique has been found to be highly versatile for the synthesis of a wide range of epitaxial oxide including dielectrics, ferroelectrics and high T{sub c} superconductors. Systems investigated include the binary oxides ZnO and TiO{sub 2} and ferroelectric oxides BaTiO{sub 3}, BaSrTiO{sub 3} and KNbO{sub 3}. Techniques used to evaluate the defect structure included deep level transient spectroscopy (DLTS), photocapacitance spectroscopy, and photoluminescence (PL) spectroscopy. High purity, stoichiometric oxide films were deposited and their defect structure evaluated. Epitaxial ZnO was deposited at temperatures as low as 250 C. PL indicated only near band edge ultraviolet emission showing that both extrinsic and intrinsic point defects could be significantly lowered in OMCVD derived thin films compared to that of the bulk. This presumably was a result of low deposition temperatures and high purity starting materials. Ferroelectric oxides epitaxial thin films of BaTiO{sub 3} and the solid solution BaSrTiO{sub 3} were synthesized and the defect structure determined. Photocapacitance spectroscopy was developed to quantify electrically active defects in the oxides. Defects with concentrations as low as 10{sup 14} cm{sup -3} were observed and their properties determined. A new model was developed for the electronic transport properties of intrinsic and extrinsic BaTiO{sub 3}. A transport model was proposed whereby conduction in La doped films occurs via hopping in localized states within a pseudogap formed between a lower Hubbard band and the conduction band edge. The influence of the size effect on the ferroelectric phase transition in the thin films was investigated. The

  9. Final report

    SciTech Connect

    Dobbs, Fred C.

    2003-01-15

    species of flagellates, Spumella sp. and Bodo sp. (identifications are tentative) were isolated from South Oyster sediments by repetitive serial dilution/extinction method. Protistan cells were cultured with Cereal leaf Prescott medium and pelleted by centrifugation. Protistan DNAs were extracted with a DNA extraction kit (Sigma Co.) and the sequencing of their SSrDNA is underway. Finally, to follow up on our collaboration of Dr. Bill Johnson (Univ. of Utah), one of the co-PIs under the same NABIR umbrella, we are pleased to report we have successfully tested antibody-ferrographic capture of protists (See previous year's report for more background). Polyclonal FITC-conjugated antibody specific for a flagellate, Spumella sp., was produced by Rockland Inc., and we now are able to enumerate that species using ferrographic capture. There are, however, some issues of non-specific staining that remain to be resolved.

  10. Verb-Final Typology

    ERIC Educational Resources Information Center

    Ogihara, Saeko

    2010-01-01

    This dissertation is a typological study of verb-final languages, the purpose of which is to examine various grammatical phenomena in verb-final languages to discover whether there are correlations between the final position of the verb and other aspects of grammar. It examines how finality of the verb interacts with argument coding in simple…

  11. Vet Centers. Final rule.

    PubMed

    2016-03-01

    The Department of Veterans Affairs (VA) adopts as final an interim final rule that amends its medical regulation that governs Vet Center services. The National Defense Authorization Act for Fiscal Year 2013 (the 2013 Act) requires Vet Centers to provide readjustment counseling services to broader groups of veterans, members of the Armed Forces, including a member of a reserve component of the Armed Forces, and family members of such veterans and members. This final rule adopts as final the regulatory criteria to conform to the 2013 Act, to include new and revised definitions. PMID:26934755

  12. NARSTO Texas Final Report

    Atmospheric Science Data Center

    2013-03-06

    Final Report for the Texas PM2.5 Sampling and Analysis Study (March 11, ... Tropp,et al, 1998     NOTE: The Final Report is separated into the following PDF files: Section 1: ... Mass and Chemical Composition (PDF) Section 5: Summary, Conclusions, and Recommendations and Section 6 Bibliography (PDF) ...

  13. Cassini's Grand Finale: The Final Orbits

    NASA Astrophysics Data System (ADS)

    Spilker, Linda; Edgington, Scott

    2016-04-01

    The Cassini-Huygens mission, a joint collaboration between NASA, ESA and the Italian Space Agency, is approaching its last year of operations after nearly 12 years in orbit around Saturn. Cassini will send back its final bits of unique data on September 15th, 2017 as it plunges into Saturn's atmosphere, vaporizing and satisfying planetary protection requirements. Before that time Cassini will continue its legacy of exploration and discovery with 12 close flybys of Titan in 2016 and 2017 that will return new science data as well as sculpt the inclinations and periods of the final orbits. Even though all of our close icy satellite flybys, including those of Enceladus, are now completed, numerous Voyager-class flybys (<100,000 km) of Mimas and Enceladus remain as well as some of our best flybys of the tiny ring moons. Cassini will also continue to study seasonal and temporal changes in the system as northern summer solstice approaches. In November 2016 Cassini will transition to a series of orbits with peripases just outside Saturn's F ring. These 20 orbits will include close flybys of some tiny ring moons and excellent views of the F ring and outer A ring. The 126th and final close flyby of Titan will propel Cassini across Saturn's main rings and into its final orbits. Cassini's Grand Finale, starting in April 2017, is comprised of 22 orbits at an inclination of 63 degrees. Cassini will repeatedly dive between the innermost rings and the upper atmosphere of the planet providing insights into fundamental questions unattainable during the rest of the mission. Cassini will be the first spacecraft to explore this region. These close orbits provide the highest resolution observations of both the rings and Saturn, and direct in situ sampling of the ring particles, composition, plasma, Saturn's exosphere and the innermost radiation belts. Saturn's gravitational field will be measured to unprecedented accuracy, providing information on the interior structure of the planet

  14. Cassini's Grand Finale

    NASA Astrophysics Data System (ADS)

    Edgington, Scott G.; Spilker, Linda J.

    2016-07-01

    After more than a decade exploring Saturn and its moons, the Cassini mission is in its closing act. Cassini's last year is an encore performance stuffed with science, including a final plunge into Saturn's atmosphere.

  15. Endeavour's Final Voyage

    NASA Video Gallery

    After nearly two decades of achievements in space, Endeavour makes one last reach for the stars on its 25th and final mission, STS-134. This webcast examines the mission to come and explores the st...

  16. Final focus test beam

    SciTech Connect

    Not Available

    1991-03-01

    This report discusses the following: the Final Focus Test Beam Project; optical design; magnets; instrumentation; magnetic measurement and BPM calibration; mechanical alignment and stabilization; vacuum system; power supplies; control system; radiation shielding and personnel protection; infrastructure; and administration.

  17. Expedition 34 Final Training

    NASA Video Gallery

    The Expedition 34 crew members conduct final training at the Gagarin Cosmonaut Training Center before their Dec. 19 launch to the International Space Station. Flight Engineers Chris Hadfield, Roman...

  18. Aurora final report

    SciTech Connect

    Robert, Dross; Amedeo, Conti

    2013-12-06

    Final Technical report detailing the work done by Nuvera and its partners to fulfill the goals of the program "Transport Studies Enabling Efficiency Optimization of Cost-Competitive Fuel Cell Stacks" (a.k.a. AURORA)

  19. 10 CFR 950.37 - Final agreement or final decision.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Final agreement or final decision. 950.37 Section 950.37 Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Dispute Resolution Process § 950.37 Final agreement or final decision. (a) If the parties reach a Final Agreement on a...

  20. Project Adobe. Final Report.

    ERIC Educational Resources Information Center

    Van Curen, Sallie A.

    This final report describes activities and accomplishments of Project Adobe, the New Mexico Parent Training and Information Center, which provides information, support, education and training to families with school-aged children with disabilities in their local communities. Achievements include: (1) completion and printing of a booklet on the…

  1. GENIE final state interactions

    SciTech Connect

    Dytman, Steven

    2015-10-15

    Final state interactions are an important component of any neutrino-nucleus Monte Carlo program. GENIE has 2 FSI programs which serve different purposes. Each has fair-good agreement with a wide range of hadron-nucleus data. Recent improvements and planned advancements are described.

  2. Space Station Final Configuration

    NASA Technical Reports Server (NTRS)

    1994-01-01

    An artist's conception of what the final configuration of the International Space Station (ISS) will look like when it is fully built and deployed. The ISS is a multidisciplinary laboratory, technology test bed, and observatory that will provide an unprecedented undertaking in scientific, technological, and international experimentation.

  3. Final Technical Report

    SciTech Connect

    Gilbert, Chris

    2014-11-13

    The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

  4. Perception of Final Lengthening.

    ERIC Educational Resources Information Center

    Edwards, Jan; Beckman, Mary

    A series of phonetic production and perception experiments were designed to describe the phonological or phonetic domains of two effects in spoken English: final lengthening, generally interpreted as a mark for the edge of some linguistically-defined unit of speech production, and stress-timed shortening, generally interpreted as evidence for…

  5. Rosetta: The Final Furlong

    NASA Astrophysics Data System (ADS)

    Wright, I. P.; Andrews, D. J.; Barber, S. J.; Sheridan, S.; Morgan, G. H.; Morse, A. D.

    2014-09-01

    By the time of the meeting, the Rosetta spacecraft will have formally arrived at its target comet, and final landing site selection will be in progress. One of the instruments that will be sent down to the surface of the comet is Ptolemy (a GC-MS).

  6. Final Prep on SSME

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Alvin Pittman Sr., lead electronics technician with Pratt & Whitney Rocketdyne, and Janine Cuevas, a mechanical technician with PWR, perform final preparations on the space shuttle main engine tested Oct. 25, 2005, at NASA's Stennis Space Center. It was the first main engine test since Hurricane Katrina hit the Gulf Coast on Aug. 29.

  7. GENIE final state interactions

    NASA Astrophysics Data System (ADS)

    Dytman, Steven

    2015-10-01

    Final state interactions are an important component of any neutrino-nucleus Monte Carlo program. GENIE has 2 FSI programs which serve different purposes. Each has fair-good agreement with a wide range of hadron-nucleus data. Recent improvements and planned advancements are described.

  8. Caregivers program. Final rule.

    PubMed

    2015-01-01

    The Department of Veterans Affairs (VA) adopts, with changes, the interim final rule concerning VA's Program of Comprehensive Assistance for Family Caregivers. VA administers this program to provide certain medical, travel, training, and financial benefits to caregivers of certain veterans and servicemembers who were seriously injured during service on or after September 11, 2001. Also addressed in this rulemaking is the Program of General Caregiver Support Services that provides support services to caregivers of veterans from all eras who are enrolled in the VA health care system. Specifically, changes in this final rule include a requirement that Veterans be notified in writing should a Family Caregiver request revocation (to no longer be a Family Caregiver), an extension of the application timeframe from 30 days to 45 days for a Family Caregiver, and a change in the stipend calculation to ensure that Primary Family Caregivers do not experience unexpected decreases in stipend amounts from year to year. PMID:25581943

  9. Final Technical Report

    SciTech Connect

    Maxwell, Mike, J., P.E.

    2012-08-30

    The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

  10. Final Technical Report

    SciTech Connect

    Klein, Stephen A.

    2005-10-27

    In this final technical report, a summary of work is provided. Work toward an improved representation of frontal clouds in global climate models occurred. This involved analysis of cloud variability in ARM observations and the careful contrast of single column model solutions with ARM data. In addition, high resolution simulations of frontal clouds were employed to diagnosis processes that are important for the development of frontal clouds.

  11. Geolocation Technologies Final Report

    SciTech Connect

    Magnoli, D E

    2003-06-02

    This paper is the final report for LL998 In Situ Sensing Subtask 7 (Geo-location) undertaken for NNSA NA-22 enabling technologies R&D for Counterproliferation Detection. A few state-of-the-art resolution parameters are presented for accelerometers, indoor and outdoor GPS (Global Positioning Satellite) systems, and INSs (Inertial Navigation Systems). New technologies are described, including one which has demonstrated the ability to track within a building to a resolution of under a foot.

  12. Service dogs. Final rule.

    PubMed

    2012-09-01

    The Department of Veterans Affairs (VA) amends its regulations concerning veterans in need of service dogs. Under this final rule, VA will provide to veterans with visual, hearing, or mobility impairments benefits to support the use of a service dog as part of the management of such impairments. The benefits include assistance with veterinary care, travel benefits associated with obtaining and training a dog, and the provision, maintenance, and replacement of hardware required for the dog to perform the tasks necessary to assist such veterans. PMID:22950145

  13. Final Technical Report

    SciTech Connect

    Sobecky, Patricia A; Taillefert, Martial

    2013-03-29

    This final technical report describes results and findings from a research project to examine the role of microbial phosphohydrolase enzymes in naturally occurring subsurface microorganisms for the purpose of promoting the immobilization of the radionuclide uranium through the production of insoluble uranium phosphate minerals. The research project investigated the microbial mechanisms and the physical and chemical processes promoting uranium biomineralization and sequestration in oxygenated subsurface soils. Uranium biomineralization under aerobic conditions can provide a secondary biobarrier strategy to immobilize radionuclides should the metal precipitates formed by microbial dissimilatory mechanisms remobilize due to a change in redox state.

  14. Final Progress Report

    SciTech Connect

    Josef Michl

    2011-10-31

    In this project we have established guidelines for the design on organic chromophores suitable for producing high triplet yields via singlet fission. We have proven their utility by identifying a chromophore of a structural class that had never been examined for singlet fission before, 1,3-diphenylisobenzofuran, and demonstrating in two independent ways that a thin layer of this material produces a triplet yield of 200% within experimental error. We have also designed a second chromophore of a very different type, again of a structural class that had not been examined for singlet fission before, and found that in a thin layer it produces a 70% triplet yield. Finally, we have enhanced the theoretical understanding of the quantum mechanical nature of the singlet fission process.

  15. Final Meeting of NACA

    NASA Technical Reports Server (NTRS)

    1958-01-01

    Final meeting of National Advisory Committee for Aeronautics, August 21, 1958. After the launch of the Soviet Union's Sputnik I satellite in October 1957, the United States realized that it needed a space program to keep up with the technological advancements made by the Soviets. On July 29, 1958, President Dwight D. Eisenhower signed Public Law 85-568 and established the National Aeronautics and Space Administration (NASA). T. Keith Glennan was sworn in as the first Administrator of NASA on August 19, 1958, and by October 1, the official effective date of the new agency, the National Advisory Committee for Aeronautics (NACA) was absorbed by NASA. Left to right: T. Keith Glennan, NASA Administrator; Mr. Preston R. Bassett, member of the NACA Committee on Aerodynamics; Mr. Charles J. McCarthy, Chairman of the Board, Chance Vought Aircraft, Inc.

  16. FINAL/ SCIENTIFIC TECHNICAL REPORT

    SciTech Connect

    McDonald, Henry; Singh, Suminderpal

    2006-08-28

    The overall objective of the Chattanooga fuel cell demonstrations project was to develop and demonstrate a prototype 5-kW grid-parallel, solid oxide fuel cell (SOFC) system that co-produces hydrogen, based on Ion America’s technology. The commercial viability of the 5kW SOFC system was tested by transporting, installing and commissioning the SOFC system at the Alternative Energy Laboratory at the University of Tennessee – Chattanooga. The system also demonstrated the efficiency and the reliability of the system running on natural gas. This project successfully contributed to the achievement of DOE technology validation milestones from the Technology Validation section of the Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan. Results of the project can be found in the final technical report.

  17. Final Scientific EFNUDAT Workshop

    ScienceCinema

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilities  International Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden) Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis Vlachoudis Workshop Assistant: Géraldine Jean

  18. Final Technical Report

    SciTech Connect

    John Tanis

    2005-11-25

    This document comprises the final technical report for atomic collisions research supported by DOE grant No. DE-FG02-87ER13778 from September 1, 2001 through August 31, 2004. The research involved the experimental investigation of excitation and charge-changing processes occurring in ion-atom and ion-molecule collisions. Major emphases of the study were: (1) interference effects resulting from coherent electron emission in H2, (2) production of doubly vacant K-shell (hollow ion) states due to electron correlation, and (3) formation of long-lived metastable states in electron transfer processes. During the period of the grant, this research resulted in 23 publications, 12 invited presentations, and 39 contributed presentations at national and international meetings and other institutions. Brief summaries of the completed research are presented below.

  19. AIPM Final Report

    SciTech Connect

    John Mookken

    2006-06-30

    The final AIPM project report consists of six sections. Each section includes information on the original AIPM project and extension work on the high temperature design. The first section (1) provides an overview of the program and highlights the significant targets to meet at the end of the program. The next section (2) summarizes the significant technical accomplishments by the SEMIKRON AIPM team during the course of the project. Greater technical details are provided in a collection of all the quarterly reports which can be found in the appendix. Section three (3) presents some the more significant technical data collected from technology demonstrators. Section four (4) analyzes the manufacturing cost or economic aspects of producing 100,000 units/yr. Section five (5) describes the commercialization efforts of the AIPM technology into the automotive market. The last section (6) recommends follow on work that will build on the efforts and achievements of the AIPM program.

  20. Final cook temperature monitoring

    NASA Astrophysics Data System (ADS)

    Stewart, John; Matthews, Michael; Glasco, Marc

    2006-04-01

    Fully cooked, ready-to-eat products represent one of the fastest growing markets in the meat and poultry industries. Modern meat cooking facilities typically cook chicken strips and nuggets at rates of 6000 lbs per hour, and it is a critical food safety issue to ensure the products on these lines are indeed fully cooked. Common practice now employs oven technicians to constantly measure final cook temperature with insertion-type thermocouple probes. Prior research has demonstrated that thermal imagery of chicken breasts and other products can be used to predict core temperature of products leaving an oven. In practice, implementation of a system to monitor core temperature can be difficult for several reasons. First, a wide variety of products are typically produced on the same production line and the system must adapt to all products. Second, the products can be often hard to find because they often leave the process in random order and may be touching or even overlapping. Another issue is finite measurement time which is typically only a few seconds. Finally, the system is subjected to a rigorous sanitation cycle and must hold up under wash down conditions. To address these problems, a calibrated 320x240 micro-bolometer camera was used to monitor the temperature of formed, breaded poultry products on a fully cooked production line for a period of one year. The study addressed the installation and operation of the system as well as the development of algorithms used to identify the product on a cluttered conveyor belt. It also compared the oven tech insertion probe measurements to the non-contact monitoring system performance.

  1. Final Technical Report

    SciTech Connect

    Aristos Aristidou Natureworks); Robert Kean; Tom Schechinger; Stuart Birrell; Jill Euken

    2007-10-01

    The two main objectives of this project were: 1) to develop and test technologies to harvest, transport, store, and separate corn stover to supply a clean raw material to the bioproducts industry, and 2) engineer fermentation systems to meet performance targets for lactic acid and ethanol manufacturers. Significant progress was made in testing methods to harvest corn stover in a “single pass” harvest mode (collect corn grain and stover at the same time). This is technically feasible on small scale, but additional equipment refinements will be needed to facilitate cost effective harvest on a larger scale. Transportation models were developed, which indicate that at a corn stover yield of 2.8 tons/acre and purchase price of $35/ton stover, it would be unprofitable to transport stover more than about 25 miles; thus suggesting the development of many regional collection centers. Therefore, collection centers should be located within about 30 miles of the farm, to keep transportation costs to an acceptable level. These collection centers could then potentially do some preprocessing (to fractionate or increase bulk density) and/or ship the biomass by rail or barge to the final customers. Wet storage of stover via ensilage was tested, but no clear economic advantages were evident. Wet storage eliminates fire risk, but increases the complexity of component separation and may result in a small loss of carbohydrate content (fermentation potential). A study of possible supplier-producer relationships, concluded that a “quasi-vertical” integration model would be best suited for new bioproducts industries based on stover. In this model, the relationship would involve a multiyear supply contract (processor with purchase guarantees, producer group with supply guarantees). Price will likely be fixed or calculated based on some formula (possibly a cost plus). Initial quality requirements will be specified (but subject to refinement).Producers would invest in harvest

  2. Final technical report.

    SciTech Connect

    Emmanuel J. Candes

    2007-11-06

    In the last two dcades or so, many multiscale algorthms have been proposed to enable large scale computations which were thought as nearly intractable. For example, the fast multipole algorithm and other similar ideas have allowed to considerably speed up fundamental computations in electromagnetism, and many other fields. The thesis underlying this proposal is that traditional multiscale methods have been well-developed and it is clear that we now need new ideas in areas where traditional spatial multiscaling is ill-suited. In this context, the proposal argues that clever phase-space computations is bound to plan a crucial role in advancing algorithms and high-performance scientific computing. Our research past accomplishments have shown the existence of ideas beyond the traditional scale-space viewpoint such as new multiscale geometric representations of phase-space. We have shown that these clever representations lead to enhanced sparsity. We have shown that enhanced sparsity has significant important implications both for analysis, and for numerical applications, where sparsity allows for faster algorithms. We have implemented these ideas and built computational tools to be used as new building blocks of a new generation of wave propagation solvers. Finally, we have deployed these ideas into novel algorithms. In this last year, we assembled all these techniques and made significant progress in solving a variety of computational problems, which we then applied in selected areas of considerable scientific interest.

  3. Final Technical Report

    SciTech Connect

    Dmitriy Y. Anistratov; Marvin L. Adams; Todd S. Palmer; Kord S. Smith; Kevin Clarno; Hikaru Hiruta; Razvan Nes

    2003-08-04

    OAK B202 Final Technical Report. The present generation of reactor analysis methods uses few-group nodal diffusion approximations to calculate full-core eigenvalues and power distributions. The cross sections, diffusion coefficients, and discontinuity factors (collectively called ''group constants'') in the nodal diffusion equations are parameterized as functions of many variables, ranging from the obvious (temperature, boron concentration, etc.) to the more obscure (spectral index, moderator temperature history, etc.). These group constants, and their variations as functions of the many variables, are calculated by assembly-level transport codes. The current methodology has two main weaknesses that this project addressed. The first weakness is the diffusion approximation in the full-core calculation; this can be significantly inaccurate at interfaces between different assemblies. This project used the nodal diffusion framework to implement nodal quasidiffusion equations, which can capture transport effects to an arbitrary degree of accuracy. The second weakness is in the parameterization of the group constants; current models do not always perform well, especially at interfaces between unlike assemblies. The project developed a theoretical foundation for parameterization and homogenization models and used that theory to devise improved models. The new models were extended to tabulate information that the nodal quasidiffusion equations can use to capture transport effects in full-core calculations.

  4. Final Technical Report

    SciTech Connect

    Velasco, Mayda

    2013-11-01

    This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.

  5. Final Technical Report

    SciTech Connect

    Alexander Fridman

    2005-06-01

    This DOE project DE-FC36-04GO14052 ''Plasma Pilot Plant Test for Treating VOC Emissions from Wood Products Plants'' was conducted by Drexel University in cooperation with Georgia-Pacific (G-P) and Kurchatov Institute (KI). The objective of this project was to test the Plasma Pilot Plant capabilities in wood industry. The final goal of the project was to replace the current state-of-the-art, regenerative thermal oxidation (RTO) technology by Low-Temperature Plasma Technology (LTPT) in paper and wood industry for Volatile Organic Components (VOC) destruction in High Volume Low Concentration (HVLC) vent emissions. MetPro Corporation joined the team as an industrial partner from the environmental control business and a potential leader for commercialization. Concurrent Technology Corporation (CTC) has a separate contract with DOE for this technology evaluation. They prepared questionnaires for comparison of this technology and RTO, and made this comparison. These data are presented in this report along with the description of the technology itself. Experiments with the pilot plant were performed with average plasma power up to 3.6 kW. Different design of the laboratory and pilot plant pulsed coronas, as well as different analytical methods revealed many new peculiarities of the VOC abatement process. The work reported herein describes the experimental results for the VOCs removal efficiency with respect to energy consumption, residence time, water effect and initial concentration.

  6. Final Report to DOE

    SciTech Connect

    Ismail Gultepe

    2012-05-15

    This final report summarizes the accomplished goals and provide a list of the publications and presentations made during the project. The goals of the project were accomplished through the various publications submitted to Journals and presentations done at the DOE and international meetings and conferences. The 8 journal articles related to the goals of this project were accepted or submitted. The 23 presentations related to goals of the project were presented at the meetings. There were some minor changes regarding to project goals because of issues encountered during the analysis of the data. For example, a total water probe sensor mounted on the Convair-580 that can be used for defining mixed phase conditions and parameterization, had some problems to estimate magnitude of total water mass, and this resulted in issues providing an accurate parameterization for cloud fraction. Variability related aerosol number concentrations and their composition for direct and indirect effects were studied and published. Results were given to explain aerosol and ice microphysical effects on climate change studies. It is suggested that developed parameterizations should consider the variability in aerosol and ice parameters over the Arctic regions.

  7. Final Technical Report

    SciTech Connect

    Alexander Pigarov

    2012-06-05

    This is the final report for the Research Grant DE-FG02-08ER54989 'Edge Plasma Simulations in NSTX and CTF: Synergy of Lithium Coating, Non-Diffusive Anomalous Transport and Drifts'. The UCSD group including: A.Yu. Pigarov (PI), S.I. Krasheninnikov and R.D. Smirnov, was working on modeling of the impact of lithium coatings on edge plasma parameters in NSTX with the multi-species multi-fluid code UEDGE. The work was conducted in the following main areas: (i) improvements of UEDGE model for plasma-lithium interactions, (ii) understanding the physics of low-recycling divertor regime in NSTX caused by lithium pumping, (iii) study of synergistic effects with lithium coatings and non-diffusive ballooning-like cross-field transport, (iv) simulation of experimental multi-diagnostic data on edge plasma with lithium pumping in NSTX via self-consistent modeling of D-Li-C plasma with UEDGE, and (v) working-gas balance analysis. The accomplishments in these areas are given in the corresponding subsections in Section 2. Publications and presentations made under the Grant are listed in Section 3.

  8. MIST final report

    SciTech Connect

    Gloudemans, J.R. )

    1991-08-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock Wilcox. The unique features of the Babcock Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to addresss the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST program is reported in eleven volumes; Volumes 2 through 8 pertain to groups of Phase 3 tests by type, Volume 9 presents inter-group comparisons. Volume 10 provides comparisons between the RELAP5 MOD2 calculations and MIST observations, and Volume 11 (with addendum) presents the later, Phase 4 tests. This is Volume 1 of the MIST final report, a summary of the entire MIST program. Major topics include: test advisory grop (TAG) issues; facility scaling and design; test matrix; observations; comparisons of RELAP5 calculations to MIST observations; and MIST versus the TAG issues. 11 refs., 29 figs., 9 tabs.

  9. Enhanced superconductors. Final report

    SciTech Connect

    Olsen, R.B.

    1992-05-01

    One of the major challenges facing high temperature superconductors is the making of non-brittle materials. Based on the successful discovery of high temperature perovskite superconductors, a new class of superconducting materials is hypothesized. The proposed class will be mechanically tough and may have high critical temperatures. The proposed material will be inexpensive to manufacture and easily formed into wires and bands. The project's research goal was to detect a superconducting transition in a specific material within this proposed new class. Substantial progress was made toward this objective. In Phase I a major milestone, the bulk conversion of a precursor material, was successfully accomplished. The second model precursor polymer, Polychlorofluoroethylene (PCFE), was synthesized for this study. This allowed the possibility of making low defect polyfluoroacetylene. This synthesis route yielded poly(fluoroacetylene) with a significantly lower defect density when compared to HF-eliminated fluoropolymer films. The final phase of this work was directed to synthesis of poly(2,3,5,6-tetrafluoro-para-phenylene vinylene) (PTFPPV). While making significant progress in synthesizing conducting polymers with polar or polarizable groups, this study did not reach its ultimate goal of producing a model compound with all of the necessary chemical properties to test the exciton model of superconductivity.

  10. Tiger LDRD final report

    SciTech Connect

    Steich, D J; Brugger, S T; Kallman, J S; White, D A

    2000-02-01

    This final report describes our efforts on the Three-Dimensional Massively Parallel CEM Technologies LDRD project (97-ERD-009). Significant need exists for more advanced time domain computational electromagnetics modeling. Bookkeeping details and modifying inflexible software constitute a vast majority of the effort required to address such needs. The required effort escalates rapidly as problem complexity increases. For example, hybrid meshes requiring hybrid numerics on massively parallel platforms (MPPs). This project attempts to alleviate the above limitations by investigating flexible abstractions for these numerical algorithms on MPPs using object-oriented methods, providing a programming environment insulating physics from bookkeeping. The three major design iterations during the project, known as TIGER-I to TIGER-III, are discussed. Each version of TIGER is briefly discussed along with lessons learned during the development and implementation. An Application Programming Interface (API) of the object-oriented interface for Tiger-III is included in three appendices. The three appendices contain the Utilities, Entity-Attribute, and Mesh libraries developed during the project. The API libraries represent a snapshot of our latest attempt at insulated the physics from the bookkeeping.

  11. Electrocatalytic hydrocracking. Final report

    SciTech Connect

    Vaart, D.R. van der

    1992-06-01

    This report describes an electrocatalytic method for the chemical addition of hydrogen to a model hydrocarbon compound. In the method, hydrogen formed by water electrolysis at the counter electrode of an electrochemical cell is delivered via conduction through a proton-conducting solid electrolyte. The working electrode of the cell is, at the same time, a hydrocracking catalyst and therefore promotes the reaction of the hydrogen with the hydrocarbon. This process would have clear and distinct advantages over conventional hydroprocessing technologies in that the hydrogen concentration at the catalyst surface could be controlled and maintained by the applied electromotive force. This control would allow operation of the electrocatalytic reactor at ambient pressures instead of the extremely high hydrogen partial pressures required of conventional reactors. In addition, the direct delivery of hydrogen to the catalyst surface should inhibit coke formation and thus prolong the life of the catalyst. Finally, hydrogen utilization efficiencies should be greatly improved since the hydrogen is delivered directly to the reaction site thereby eliminating hydrogen solubility loss in the effluent stream. This report details the demonstration of (a) the ability of a solid electrolyte to perform as a catalyst, (b) the conduction of hydrogen through a solid electrolyte and (c) the simultaneous exploitation of these two properties. Hence, the essential concept of electrocatalytic hydrocracking has been demonstrated. An objective of future work in this area should be to determine whether the hydrocracking or hydrogenation reactions are actually enhanced during the electrocatalytic process when compared to the conventional catalytic process.

  12. MTX final report

    SciTech Connect

    Hooper, E.B.; Allen, S.L.; Brown, M.D.; Byers, J.A.; Casper, T.A.; Cohen, B.I.; Cohen, R.H.; Fenstermacher, M.E.; Foote, J.H.; Hoshino, K.

    1994-01-01

    The MTX experiment was proposed in 1986 to apply high frequency microwaves generated by a free-electron laser (FEL) to electron cyclotron resonance heating (ECRH) in a high field, high density tokamak. As the absorption of microwaves at the electron cyclotron resonance requires high frequencies, the opportunity of applying a free-electron laser has appeal as the device is not limited to frequencies in the microwave or long millimeter wavelength regions, in contrast to many other sources. In addition, the FEL is inherently a high power source of microwaves, which would permit single units of 10 MW or more, optimum for reactors. Finally, it was recognized early in the study of the application of the FEL based on the induction linear accelerator, that the nonlinear effects associated with the intense pulses of microwaves naturally generated would offer several unique opportunities to apply ECRH to current drive, MHD control, and other plasma effects. It was consequently decided to adapt the induction accelerator based FEL to heating and controlling the tokamak, and to conduct experiments on the associated physics. To this end, the Alcator C tokamak was moved from the Massachusetts Institute of Technology (MIT) to the Lawrence Livermore National Laboratory where it was installed in Building 431 and operated from March, 1989, until the conclusion of the experiment in October, 1992. The FEL, based on the ETA-11 accelerator and IMP wiggler was brought into operation by the LLNL Electron Beam Group and power injected into the tokamak during an experimental run in the Fall, 1989. Following an upgrade by the MTX group, a second experimental run was made lasting from the Winter, 1992 through the end of the experiment. Significant contributions to the ECRH experiments were made by the Japan Atomic Energy Research Institute (JAERI).

  13. Enthalpy studies. Final report

    SciTech Connect

    Mathias, P.M.; Stein, F.P.

    1984-05-01

    This report describes the evaluation and enhancement of the enthalpy model developed for the SRC-I process (as well as the other coal-liquefaction processes). A preliminary version of the model was used in the Post-Baseline review of the SRC-I process design (Duffy et al., 1983), and the final version will be employed by APCI in the ASPEN PLUS Model of the SRC-I Demonstration Plant (APCI, 1984). ICRC, recognizing the need for thermophysical data on coal liquids and coal-fluid model compounds, embarked upon a 2-year experimental program. Specifically, the overall program objectives were to obtain vapor/liquid equilibrium (VLE) and enthalpy data to develop correlations and verify the designs of several important pieces of process equipment in the SRC-I demonstration plant. The enthalpy model uses a modification of the Peng-Robinson (1976) equation of state proposed by Mathias ad Copeman (1983). It was developed mainly from publicly available data on coal fluids and related model compounds (Mathias and Monks, 1982). The generalized (predictive) model has provided good agreement with experimental data on coal fluids. Surprisingly, the agreement with the data on model-compound mixtures is not as good. The practical conclusion is that, within the frame work of the present model, it is better to lump various types of components within the same pseudocomponent. The enthalpy model has achieved the main objective of an improved model for the design of several key heat exchangers in the SRC-I process. Further, the work has identified deficiencies in existing models, which suggest the focus of future research. 24 references.

  14. World Cup Final

    NASA Technical Reports Server (NTRS)

    2006-01-01

    On July 9, hundreds of millions of fans worldwide will be glued to their television sets watching the final match of the 2006 FIFA World Cup, played in Berlin's Olympic stadium (Olympiastadion). The stadium was originally built for the 1936 Summer Olympics. The Olympic Stadium seats 76,000,; its roof rises 68 meters over the seats and is made up of transparent panels that allow sunlight to stream in during the day.

    With its 14 spectral bands from the visible to the thermal infrared wavelength region, and its high spatial resolution of 15 to 90 meters (about 50 to 300 feet), ASTER images Earth to map and monitor the changing surface of our planet.

    ASTER is one of five Earth-observing instruments launched December 18, 1999, on NASA's Terra satellite. The instrument was built by Japan's Ministry of Economy, Trade and Industry. A joint U.S./Japan science team is responsible for validation and calibration of the instrument and the data products.

    The broad spectral coverage and high spectral resolution of ASTER provides scientists in numerous disciplines with critical information for surface mapping, and monitoring of dynamic conditions and temporal change. Example applications are: monitoring glacial advances and retreats; monitoring potentially active volcanoes; identifying crop stress; determining cloud morphology and physical properties; wetlands evaluation; thermal pollution monitoring; coral reef degradation; surface temperature mapping of soils and geology; and measuring surface heat balance.

    The U.S. science team is located at NASA's Jet Propulsion Laboratory, Pasadena, Calif. The Terra mission is part of NASA's Science Mission Directorate.

    Size: 12.1 by 15.9 kilometers (7.5 by 9.5 miles) Location: 52.5 degrees North latitude, 13.3 degrees East longitude Orientation: North at top Image Data: ASTER bands 3, 2, and 1 Original Data Resolution: 15 meters (49.2 feet) Dates Acquired: October 15, 2005

  15. 40 CFR 22.31 - Final order.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Final order. 22.31 Section 22.31... PERMITS Final Order § 22.31 Final order. (a) Effect of final order. A final order constitutes the final Agency action in a proceeding. The final order shall not in any case affect the right of the Agency...

  16. Final Technical Report

    SciTech Connect

    Bohdan W. Oppenheim; Rudolf Marloth

    2007-10-26

    Executive Summary The document contains Final Technical Report on the Industrial Assessment Center Program at Loyola Marymount University in Los Angeles, covering the contract period of 9/1/2002 to 11/30/2006, under the contract DE-FC36-02GO 12073. The Report describes six required program tasks, as follows: TASK 1 is a summary of the assessments performed over the life of the award: 77 assessments were performed, 595 AR were recommended, covering a very broad range of manufacturing plants. TASK 2 is a description of the efforts to promote and increase the adoption of assessment recommendations and employ innovative methods to assist in accomplishing these goals. The LMU IAC has been very successful in accomplishing the program goals, including implemented savings of $5,141,895 in energy, $10,045,411 in productivity and $30,719 in waste, for a total of $15,218,025. This represents 44% of the recommended savings of $34,896,392. TASK 3 is a description of the efforts promoting the IAC Program and enhancing recruitment efforts for new clients and expanded geographic coverage. LMU IAC has been very successful recruiting new clients covering Southern California. Every year, the intended number of clients was recruited. TASK 4 describes the educational opportunities, training, and other related activities for IAC students. A total of 38 students graduated from the program, including 2-3 graduate students every semester, and the remainder undergraduate students, mostly from the Mechanical Engineering Department. The students received formal weekly training in energy (75%) and productivity (25). All students underwent extensive safety training. All students praised the IAC experience very highly. TASK 5 describes the coordination and integration of the Center activities with other Center and IAC Program activities, and DOE programs. LMU IAC worked closely with MIT, and SDSU IAC and SFSU IAC, and enthusiastically supported the SEN activities. TASK 6 describes other tasks

  17. [Nonlinear magnetohydrodynamics]. Final report

    SciTech Connect

    Montgomery, D.C.

    1998-11-01

    This is a final report on the research activities carried out under the above grant at Dartmouth. During the period considered, the grant was identified as being for nonlinear magnetohydrodynamics, considered as the most tractable theoretical framework in which the plasma problems associated with magnetic confinement of fusion plasmas could be studied. During the first part of the grant`s lifetime, the author was associated with Los Alamos National Laboratory as a consultant and the work was motivated by the reversed-field pinch. Later, when that program was killed at Los Alamos, the problems became ones that could be motivated by their relation to tokamaks. Throughout the work, the interest was always on questions that were as fundamental as possible, compatible with those motivations. The intent was always to contribute to plasma physics as a science, as well as to the understanding of mission-oriented confined fusion plasmas. Twelve Ph.D. theses were supervised during this period and a comparable number of postdoctoral research associates were temporarily supported. Many of these have gone on to distinguished careers, though few have done so in the context of the controlled fusion program. Their work was a combination of theory and numerical computation, in gradually less and less idealized settings, moving from rectangular periodic boundary conditions in two dimensions, through periodic straight cylinders and eventually, before the grant was withdrawn, to toroids, with a gradually more prominent role for electrical and mechanical boundary conditions. The author never had access to a situation where he could initiate experiments and relate directly to the laboratory data he wanted. Computers were the laboratory. Most of the work was reported in referred publications in the open literature, copies of which were transmitted one by one to DOE at the time they appeared. The Appendix to this report is a bibliography of published work which was carried out under the

  18. ASEDRA Evaluation Final Report.

    SciTech Connect

    Mitchell, Dean James; Detwiler, Dr. Rebecca; Sjoden, Dr, Glenn E.

    2008-09-01

    The performance of the Advanced Synthetically Enhanced Detector Resolution Algorithm (ASEDRA) was evaluated by performing a blind test of 29 sets of gamma-ray spectra that were provided by DNDO. ASEDRA is a post-processing algorithm developed at the Florida Institute of Nuclear Detection and Security at the University of Florida (UF/FINDS) that extracts char-acteristic peaks in gamma-ray spectra. The QuickID algorithm, also developed at UF/FINDS, was then used to identify nuclides based on the characteristic peaks generated by ASEDRA that are inferred from the spectra. The ASEDRA/QuickID analysis results were evaluated with respect to the performance of the DHSIsotopeID algorithm, which is a mature analysis tool that is part of the Gamma Detector Response and Analysis Software (GADRAS). Data that were used for the blind test were intended to be challenging, and the radiation sources included thick shields around the radioactive materials as well as cargo containing naturally occurring radio-active materials, which masked emission from special nuclear materials and industrial isotopes. Evaluation of the analysis results with respect to the ground truth information (which was provided after the analyses were finalized) showed that neither ASEDRA/QuickID nor GADRAS could identify all of the radiation sources correctly. Overall, the purpose of this effort was primarily to evaluate ASEDRA, and GADRAS was used as a standard against which ASEDRA was compared. Although GADRAS was somewhat more accurate on average, the performance of ASEDRA exceeded that of GADRAS for some of the unknowns. The fact that GADRAS also failed to identify many of the radiation sources attests to the difficulty of analyzing the blind-test data that were used as a basis for the evaluation. This evaluation identified strengths and weaknesses of the two analysis approaches. The importance of good calibration data was also clear because the performance of both analysis methods was impeded by the

  19. Final Technical Report

    SciTech Connect

    Brizard, Alain J

    2009-12-31

    Final Technical Report for U.S. Department of Energy Grant No. DE-FG02-09ER55005 Nonlinear FLR Effects in Reduced Fluid Models Alain J. Brizard, Saint Michael's College The above-mentioned DoE grant was used to support research activities by the PI during a sabbatical leave from Saint Michael's College in 2009. The major focus of the work was the role played by guiding-center and gyrocenter (linear and nonlinear) polarization and magnetization effects in understanding transport processes in turbulent magnetized plasmas. The theoretical tools used for this work include Lie-transform perturbation methods and Lagrangian (variational) methods developed by the PI in previous work. The present final technical report lists (I) the peer-reviewed publications that were written based on work funded by the Grant; (II) invited and contributed conference presentations during the period funded by the Grant; and (III) seminars presented during the period funded by the Grant. I. Peer-reviewed Publications A.J. Brizard and N. Tronko, 2011, Exact momentum conservation for the gyrokinetic Vlasov- Poisson equations, Physics of Plasmas 18 , 082307:1-14 [http://dx.doi.org/10.1063/1.3625554 ]. J. Decker, Y. Peysson, A.J. Brizard, and F.-X. Duthoit, 2010, Orbit-averaged guiding-center Fokker-Planck operator for numerical applications, Physics of Plasmas 17, 112513:1-12 [http://dx.doi.org/10.1063/1.3519514]. A.J. Brizard, 2010, Noether derivation of exact conservation laws for dissipationless reduced fluid models, Physics of Plasmas 17, 112503:1-8 [http://dx.doi.org/10.1063/1.3515303]. F.-X. Duthoit, A.J. Brizard, Y. Peysson, and J. Decker, 2010, Perturbation analysis of trapped particle dynamics in axisymmetric dipole geometry, Physics of Plasmas 17, 102903:1-9 [http://dx.doi.org/10.1063/1.3486554]. A.J. Brizard, 2010, Exact energy conservation laws for full and truncated nonlinear gyrokinetic equations, Physics of Plasmas 17, 042303:1-11 [http://dx.doi.org/10.1063/1.3374428]. A

  20. Final Technical Report

    SciTech Connect

    Stenzel, Reiner; Urrutia, J. Manuel

    2009-09-08

    emissions are only observed in whistler spheromaks and FRCs but not in mirrors or asymmetric configurations lacking magnetic null lines. The collisionless electron energization in a toroidal null line usually produces non-Maxwellian distributions. Off the null axis electrons gain more perpendicular than parallel energy. Distributions with T{sub {perpendicular}} > T{sub {parallel}} lead to whistler instabilities which have been observed. A whistler spheromak is a source of high-frequency whistler emissions. These are usually small amplitude whistlers propagating in a complicated background magnetic field. The waves are emitted from a moving source. High frequency whistlers propagate faster than the spheromak, thus partly move ahead of it and partly in the reverse direction. In test wave experiments wave growth opposite to the direction of the hot electron flow has been observed, confirming that Doppler-shifted cyclotron resonance instabilities account for the emission process. Propagating whistler mirrors produce no significant instabilities except when they interact with other fields which exhibit null lines. For example, a whistler mirror has been launched against a stationary FRC, resulting in strong FRC heating and whistler instabilities. In the whistler mirror configuration the antenna near-zone field produces a toroidal null line outside the coil which can also become a source for whistler emissions. Finally, nonlinear EMHD research has been extended to initially unmagnetized plasmas where a new nonlinear skin depth has been discovered. When a small-amplitude oscillating magnetic field is applied to a plasma the field penetration is governed by the skin depth, collisional or collisionless depending on frequency, collision frequency and plasma frequency. However, when the magnetic field increases the electrons become magnetized and the field penetration occurs in the whistler mode if the cyclotron frequency exceeds the oscillating frequency. This phenomenon has been

  1. 10 CFR 950.37 - Final agreement or final decision.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... settlement of the contract matter in dispute, made by the sponsor and the Program Administrator. (b) The parties agree that no appeal shall be taken or further review sought, and that the Final Agreement...

  2. Final focus system for TLC

    SciTech Connect

    Oide, K.

    1988-11-01

    A limit of the chromaticity correction for the final focus system of a TeV Linear Collider (TLC) is investigated. As the result, it becomes possible to increase the aperture of the final doublet with a small increase of the horizontal US function. The new optics design uses a final doublet of 0.5 mm half-aperture and 1.4 T pole-tip field. The length of the system is reduced from 400 m to 200 m by several optics changes. Tolerances for various machine errors with this optics are also studied. 5 refs., 7 figs., 2 tabs.

  3. Deaths: Final Data for 2014.

    PubMed

    Kochanek, Kenneth D; Murphy, Sherry L; Xu, Jiaquan; Tejada-Vera, Betzaida

    2016-06-01

    Objectives-This report presents final 2014 data on U.S. deaths, death rates, life expectancy, infant mortality, and trends, by selected characteristics such as age, sex, Hispanic origin, race, state of residence, and cause of death. PMID:27378572

  4. HINTS Puerto Rico: Final Report

    Cancer.gov

    This final report describes HINTS implementation in Puerto Rico. The report addresses sampling; staffing, training and management of data collection; calling protocol; findings from the CATI Operations, and sample weights.

  5. Final Vowel-Consonant-e.

    ERIC Educational Resources Information Center

    Burmeister, Lou E.

    The utility value of the final vowel-consonant-e phonic generalization was examined using 2,715 common English words. When the vowel was defined as a single-vowel, the consonant as a single-consonant, and the final e as a single-e the generalization was found to be highly useful, contrary to other recent findings. Using the total sample of 2,715…

  6. Final State Interactions in GENIE

    NASA Astrophysics Data System (ADS)

    Dytman, S. A.; Meyer, A. S.

    2011-11-01

    Final state interactions (FSI) are an important part of all neutrino event generators because modern detectors are made of nuclei to maximize count rate. The incident neutrino will interact with one (or two) nucleons but the final state can be quite different because the hadrons will have further interactions in the residual nucleus. This has historically been one of the major differences between event generators. GENIE will now have 2 FSI codes which allow interesting comparisons for the first time.

  7. 20 CFR 636.11 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Final action. 636.11 Section 636.11 Employees... HEARINGS § 636.11 Final action. The final decision of the Secretary pursuant to section 166(b) of the Act... Officer's final determination where there has been no such hearing, constitutes final agency action...

  8. MPO B593110 - Final Report

    SciTech Connect

    Brooksby, C

    2011-07-25

    National Security Technologies, LLC (NSTec) shall provide one (1) Mechanical Engineer to support the Linear Collider Subsystem Development Program at Lawrence Livermore National Security, LLC (LLNS). The NSTec Mechanical Engineer's efforts will include engineering, design, and drawing support for the Vacuum Seal Test. NSTec will also provide a final report of the setup and input to LLNL's project management on project status. The NSTec Mechanical Engineer's efforts will also include engineering, design, and drawing support to the conceptual design for manufacturing of the Flux Concentrator Magnet. NSTec will also contribute to LLNS's final report on the Flux Concentrator Magnet. The deliverables are drawings, sketches, engineering documents, and final reports delivered to the LLNS Technical Representative.

  9. Insulated siding project: Final report

    SciTech Connect

    Not Available

    1986-12-01

    Research and development on the nibbed vinyl insulative siding product has been completed. The product has been tested and evaluated in response to the issues raised by the first and second stage reviewers in the OERI invention review process. The production run machine design has been completed, prototyped and evaluated and the agreement for full-scale production. Final evaluation and testing of the machine's flawless part production was integral to the manufacture and preparation of samples for purposes of final tests in the Ball State CERES laboratories.

  10. Final disposal of radioactive waste

    NASA Astrophysics Data System (ADS)

    Freiesleben, H.

    2013-06-01

    In this paper the origin and properties of radioactive waste as well as its classification scheme (low-level waste - LLW, intermediate-level waste - ILW, high-level waste - HLW) are presented. The various options for conditioning of waste of different levels of radioactivity are reviewed. The composition, radiotoxicity and reprocessing of spent fuel and their effect on storage and options for final disposal are discussed. The current situation of final waste disposal in a selected number of countries is mentioned. Also, the role of the International Atomic Energy Agency with regard to the development and monitoring of international safety standards for both spent nuclear fuel and radioactive waste management is described.

  11. Karlson ozone sterilizer. Final report

    SciTech Connect

    Karlson, E.

    1984-05-07

    The authors have a functional sterilization system employing ozone as a sterilization agent. This final report covers the work that led to the first medical sterilizer using ozone as the sterilizing agent. The specifications and the final design were set by hospital operating room personnel and public safety standards. Work on kill tests using bacteria, viruses and fungi determined the necessary time and concentration of ozone necessary for sterilization. These data were used in the Karlson Ozone Sterilizer to determine the length of the steps of the operating cycle and the concentration of ozone to be used. 27 references.

  12. A New Comprehensive Final Exam

    NASA Astrophysics Data System (ADS)

    Bhavsar, Suketu P.

    2015-01-01

    Instructors aspire for students to master all the material covered. The final exam should assess the breadth and depth of their learning and be a significant basis for the final grade. I insist on a comprehensive final because I want students to review early material in light of later topics. I believe that this helps students create connections, integrate understanding, and retain knowledge for the long term. For non-science majors, reviewing and retaining the large amount of astronomy material is daunting. I experimented with a final exam format that calmed their fears and encouraged thorough review. It is only practical for a class of about twenty students or less. I provided a number of challenging conceptual and problem solving questions (at least as many as there were students), crafted to interconnect and span the entire range of topics. The order of the questions reflected the sequence in which the topics had been discussed. Students received these questions in ample time to prepare prior to the final. A student could bring up to 5 standard sheets of notes to the final. At the final, each student picked a number out of a hat. This was the question they had to answer in a 5-minute presentation. They were allowed 15 minutes for a final preparation during which they could use their 5 pages of notes. The presentations were given in order, 1- 20. Written comments on at least 10 other talks, explaining what was missed or correcting a mistake were required. They were graded both on their talk and on their comments. This format required students to be prepared for any question and encouraged interaction and communication while studying. Knowing the questions beforehand provided a guide to their studying as well as allayed their fears about what could be asked. The students also received guidance to what constituted a good answer, namely accuracy (correct scientific argument, appropriate facts, no irrelevant material), thoroughness (answered the complete questions

  13. Charlotte Circle Outreach. Final Report.

    ERIC Educational Resources Information Center

    Calhoun, Mary Lynne; Rose, Terry L.; Prendergast, Donna

    This final report details the activities of the Charlotte Circle Outreach, a program designed to provide technical assistance and training to early intervention programs offering services to infants and young children with substantial disabilities, ages birth through two years. This mission was accomplished through cooperative planning with…

  14. TRICARE reimbursement revisions. Final rule.

    PubMed

    2012-06-27

    This final rule provides several necessary revisions to the regulation in order for TRICARE to be consistent with Medicare. These revisions affect: Hospice periods of care; reimbursement of physician assistants and assistant-at-surgery claims; and diagnosis-related group values, removing references to specific numeric diagnosis-related group values and replacing them with their narrative description. PMID:22737760

  15. TRICARE; diabetic education. Final rule.

    PubMed

    2010-08-01

    The Department of Defense is publishing this final rule to clarify TRICARE coverage for diabetic education. This rule introduces new definitions and addresses revisions or omissions in policy or procedure inadvertently missed in previous regulatory changes pertaining to diabetic education. PMID:20695037

  16. TRICARE Young Adult. Final rule.

    PubMed

    2013-05-29

    This final rule implements Section 702 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (NDAA for FY11). It establishes the TRICARE Young Adult (TYA) program to provide an extended TRICARE Program coverage opportunity to most unmarried children under the age of 26 of uniformed services sponsors. The TYA program is a premium-based program. PMID:23724426

  17. LSCA Final Reports: Second Series.

    ERIC Educational Resources Information Center

    Clark, Collin, Ed.

    This document includes final summary reports from recent federally funded Library Services and Construction Act (LSCA) demonstration projects in California. While some projects reported at length and others provided the bare facts, reports are excerpted but published as received, without editing beyond a uniform first page. The Summary Report Form…

  18. Data breaches. Interim final rule.

    PubMed

    2007-06-22

    This document establishes regulations to address data breaches regarding sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). The regulations implement certain provisions of Title IX of the Veterans Benefits, Health Care, and Information Technology Act of 2006, which require promulgation of these regulations as an interim final rule. PMID:17674483

  19. MINIMARS conceptual design: Final report

    SciTech Connect

    Lee, J.D.

    1986-09-01

    This volume contains the following sections: (1) fueling systems; (2) blanket; (3) alternative blanket concepts; (4) halo scraper/direct converter system study and final conceptual design; (5) heat-transport and power-conversion systems; (6) tritium systems; (7) minimars air detritiation system; (8) appropriate radiological safety design criteria; and (9) cost estimate. (MOW)

  20. Russian Cargo Craft Final Undocking

    NASA Video Gallery

    The ISS Progress 47 resupply vehicle, loaded with trash, undocked from the International Space Station’s Pirs docking compartment for the final time July 30 at 5:19 p.m. EDT. The cargo ship undo...

  1. Deaths: Final Data for 1998.

    ERIC Educational Resources Information Center

    Murphy, Sherry L.

    2000-01-01

    This report presents final 1998 data on U.S. deaths and death rates according to demographic and medical characteristics such as age, sex, race, Hispanic origin, marital status, educational attainment, injury at work, state of residence, and cause of death. Trends and patterns in general mortality, life expectancy, and infant and maternal…

  2. The Trine Project Final Report.

    ERIC Educational Resources Information Center

    Gunderson, Jon R.; And Others

    The final report describes the Trine Project which addressed three needs in the education of handicapped children: the need for an alternate writing system, the need for communication, and the need for access to general purpose computers used in the schools. The project had three major objectives: (1) to design a low-cost portable writing and…

  3. 77 FR 71714 - Final Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ..., 2005 (70 FR 7414) that amended certain provisions of title 49, Code of Federal Regulations, that... that NHTSA published on August 6, 2012 (77 FR 46677). There were no comments in response to the notice.... In the final rule published on February 14, 2005 (70 FR 7414), 49 CFR 567.4(g)(5) was amended...

  4. Physicians Training Project. Final Report.

    ERIC Educational Resources Information Center

    Bruder, Mary Beth

    This final report describes the accomplishments and activities of a project which developed, implemented, and evaluated training activities for medical students, pediatric residents, and practicing physicians to enhance their understanding of and involvement with early intervention and the special education system in Connecticut. The training…

  5. Stable Black Families. Final Report.

    ERIC Educational Resources Information Center

    Gary, Lawrence E.; And Others

    This document is the final report of a study conducted to determine what factors contribute to strong Black family life and how these strong families solve problems, in order to add to the knowledge base on stable families so as to enhance practical intervention with families in need, and to identify models of self-help strategies used by stable…

  6. Multihandicapped Blind. Final Project Report.

    ERIC Educational Resources Information Center

    Jones, Lloyd

    The final report of the Garden Grove unified school district project for 1969 through 1972 (funded through Title III) involving six multiply handicapped, legally blind children, 7- to 10-years-old, who were previously excluded from special education (SE) classes is presented. Described as the main procedural objective is development of a…

  7. Environmental Education Program. Final Report.

    ERIC Educational Resources Information Center

    Edwards, Joan; Batty, Sara O.

    This final report deals with the efforts of the Environmental Action Coalition of New York City to change its network of recycling centers from collection points to educational centers for learning about solid waste and related environmental problems. This change was accomplished by first increasing the efficiency and the stability of the centers…

  8. LSCA Final Reports: Third Series.

    ERIC Educational Resources Information Center

    Clark, Collin, Ed.

    This document includes final summary reports from 16 recent federally funded Library Services and Construction Act (LSCA) projects in California. This volume covers generally the period 1984-85, and reports are presented in six subject areas: programs for children, information and referral projects, institutional services, literacy, local history,…

  9. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  10. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Statement, Fort Pulaski National Monument, Georgia AGENCY: National Park Service, Interior. ACTION: Notice... Environmental Impact Statement for the General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort... at Fort Pulaski National Monument Headquarters, Cockspur Island, US Highway 80 East,...

  11. Simulations of neutralized final focus

    SciTech Connect

    Welch, D.R.; Rose, D.V.; Genoni, T.C.; Yu, S.S.; Barnard, J.J.

    2005-01-18

    In order to drive an inertial fusion target or study high energy density physics with heavy ion beams, the beam radius must be focused to < 3 mm and the pulse length must be compressed to < 10 ns. The conventional scheme for temporal pulse compression makes use of an increasing ion velocity to compress the beam as it drifts and beam space charge to stagnate the compression before final focus. Beam compression in a neutralizing plasma does not require stagnation of the compression, enabling a more robust method. The final pulse shape at the target can be programmed by an applied velocity tilt. In this paper, neutralized drift compression is investigated. The sensitivity of the compression and focusing to beam momentum spread, plasma, and magnetic field conditions is studied with realistic driver examples. Using the 3D particle-in-cell code, we examine issues associated with self-field generation, stability, and vacuum-neutralized transport transition and focusing.

  12. 40 CFR 750.9 - Final rule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Final rule. 750.9 Section 750.9... Section 6 of the Toxic Substances Control Act § 750.9 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. Final versions of...

  13. 40 CFR 750.9 - Final rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Final rule. 750.9 Section 750.9... Section 6 of the Toxic Substances Control Act § 750.9 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. Final versions of...

  14. 40 CFR 750.9 - Final rule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Final rule. 750.9 Section 750.9... Section 6 of the Toxic Substances Control Act § 750.9 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. Final versions of...

  15. 40 CFR 750.9 - Final rule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Final rule. 750.9 Section 750.9... Section 6 of the Toxic Substances Control Act § 750.9 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. Final versions of...

  16. 40 CFR 750.9 - Final rule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Final rule. 750.9 Section 750.9... Section 6 of the Toxic Substances Control Act § 750.9 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. Final versions of...

  17. 40 CFR 66.81 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Final action. 66.81 Section 66.81... COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Final Action § 66.81 Final action. (a) A final Agency action... State action pursuant to part 67. (b) The actions listed in paragraph (a) of this section...

  18. 75 FR 29915 - Direct Final Rulemaking Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... Federal Register published on April 11, 2000 (65 FR 19476) or you may visit http://dms.dot.gov . FOR... Transportation published a final rule adopting direct final rule procedures (69 FR 4455) and the Federal Railroad Administration published a final rule adopting direct final rule ] procedures on March 7, 2007 (72 FR...

  19. 21 CFR 1316.67 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Final order. 1316.67 Section 1316.67 Food and... PROCEDURES Administrative Hearings § 1316.67 Final order. As soon as practicable after the presiding officer... Federal Register his final order in the proceeding, which shall set forth the final rule and the...

  20. 14 CFR 17.41 - Final orders.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Final orders. 17.41 Section 17.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROCEDURAL RULES PROCEDURES FOR PROTESTS AND CONTRACT DISPUTES Finality and Review § 17.41 Final orders. All final FAA...

  1. NONLINEAR DYNAMICAL SYSTEMS - Final report

    SciTech Connect

    Philip Holmes

    2005-12-31

    This document is the final report on the work completed on DE-FG02-95ER25238 since the start of the second renewal period: Jan 1, 2001. It supplements the annual reports submitted in 2001 and 2002. In the renewal proposal I envisaged work in three main areas: Analytical and topological tools for studying flows and maps Low dimensional models of fluid flow Models of animal locomotion and I describe the progess made on each project.

  2. Measurement techniques development. Final report

    SciTech Connect

    Delamater, N.D.

    1993-08-01

    This final report covers work done through the period of performance 16 January 1991 to 16 January 1993. The work has been in support of the drive symmetry and hydrodynamic implosion experiments which Lawrence Livermore National Laboratory (LLNL) Group P-4 is designing and fielding at the NOVA laser facility at LLNL. The work done involves experimental support in obtaining data, analysis of the data, and experimental design.

  3. Inelastic final-state interaction

    SciTech Connect

    Suzuki, Mahiko; Suzuki, Mahiko

    2007-10-29

    The final-state interaction in multichannel decay processes is systematically studied with application to B decay in mind. Since the final-state interaction is intrinsically interwoven with the decay interaction in this case, no simple phase theorem like"Watson's theorem" holds for experimentally observed final states. We first examine in detail the two-channel problem as a toy-model to clarify the issues and to remedy common mistakes made in earlier literature. Realistic multichannel problems are too challenging for quantitative analysis. To cope with mathematical complexity, we introduce a method of approximation that is applicable to the case where one prominent inelastic channel dominates over all others. We illustrate this approximation method in the amplitude of the decay B to pi K fed by the intermediate states of a charmed meson pair. Even with our approximation we need more accurate information of strong interactions than we have now. Nonetheless we are able to obtain some insight in the issue and draw useful conclusions on general features on the strong phases.

  4. Final inspection of photomask blanks

    NASA Astrophysics Data System (ADS)

    Schubert, Fredi; Sauerbrei, Hartmut; Aschke, Lutz; Knapp, Konrad

    2001-04-01

    In order to increase the quality in manufacturing of future photon mask generations Schott Lithotec is brought in a brand new, much increased automatic laser inspection system into a new manufacturing line of photo mask blanks. It is in a position to detect additionally to the standard defect types further defect types like dim- and bright-chrome defects. The resolution of the system is less than 100 nm. With a quickly inspecting time per blank of less than three minutes and for the first time in the world used automatic SMIF-pod-handling this is a tool for the 100 percent final inspection in the manufacturing of photo mask blanks.

  5. Hydroprocessing SRC. Final technical report

    SciTech Connect

    Bronfenbrenner, J.C.; Garg, D.; Harris, C.F.; Znaimer, S.

    1983-09-01

    Catalyst activity and aging rate were studied in ICRC's process development unit (PDU) and at the Wilsonville Advanced Coal Liquefaction Facility under SRC-I Demonstration Plant hydroprocessing conditions. Similar studies using both high- and low-conversion modes were conducted by The Lummus Company. The studies determined variations in SRC conversion, hydrocarbon gas production, hydrogen consumption, and heteroatom removal. Samples of spent catalyst were analyzed to ascertain the reasons for catalyst deactivation. Finally, the ICRC PDU hydroprocessing results were compared with those generated at Lummus and Wilsonville pilot plants.

  6. Final amplifier design and mercury

    SciTech Connect

    Rose, E.A.; Hanson, D.E.

    1991-01-01

    The final amplifier for the Mercury KrF excimer facility is being designed. The design exercise involves extensive modeling to predict amplifier performance. Models of the pulsed-power system, including a Child-Langmuir diode with closure, electron-beam energy deposition, KrF laser kinetics, amplified spontaneous emission (ASE), a time-dependent laser extraction in the presence of ASE are presented as a design package. The design exercise indicates that the energy objective of Phase I -- 100 joules -- will be met.

  7. Final amplifier design and mercury

    SciTech Connect

    Rose, E.A.; Hanson, D.E.

    1991-12-31

    The final amplifier for the Mercury KrF excimer facility is being designed. The design exercise involves extensive modeling to predict amplifier performance. Models of the pulsed-power system, including a Child-Langmuir diode with closure, electron-beam energy deposition, KrF laser kinetics, amplified spontaneous emission (ASE), a time-dependent laser extraction in the presence of ASE are presented as a design package. The design exercise indicates that the energy objective of Phase I -- 100 joules -- will be met.

  8. Field practice internship final report

    SciTech Connect

    Foster, T.

    1994-05-01

    This field practice internship final report gives an overview of the field practice, which was completed at the Oak Ridge Y-12 Plant, Martin Marietta Energy Systems, Inc., Environmental Management Department, Oak Ridge, Tennessee. The field practice focused on the completion of the Superfund Amendments and Reauthorization Act (SARA) Title III, Emergency Planning and Community Right-to-Know Act Section 312, Tier II Report. The field practice internship was conducted on a full-time basis between December 13, 1993 through February 18, 1994. Sheila Poligone, Emergency Planning and Community Right-to-Know Act (EPCRA) Coordinator served as the field practice preceptor.

  9. [Experimental nuclear physics]. Final report

    SciTech Connect

    1991-04-01

    This is the final report of the Nuclear Physics Laboratory of the University of Washington on work supported in part by US Department of Energy contract DE-AC06-81ER40048. It contains chapters on giant dipole resonances in excited nuclei, nucleus-nucleus reactions, astrophysics, polarization in nuclear reactions, fundamental symmetries and interactions, accelerator mass spectrometry (AMS), ultra-relativistic heavy ions, medium energy reactions, work by external users, instrumentation, accelerators and ion sources, and computer systems. An appendix lists Laboratory personnel, a Ph. D. degree granted in the 1990-1991 academic year, and publications. Refs., 41 figs., 7 tabs.

  10. Virtualized Network Control. Final Report

    SciTech Connect

    Ghani, Nasir

    2013-02-01

    This document is the final report for the Virtualized Network Control (VNC) project, which was funded by the United States Department of Energy (DOE) Office of Science. This project was also informally referred to as Advanced Resource Computation for Hybrid Service and TOpology NEtworks (ARCHSTONE). This report provides a summary of the project's activities, tasks, deliverable, and accomplishments. It also provides a summary of the documents, software, and presentations generated as part of this projects activities. Namely, the Appendix contains an archive of the deliverables, documents, and presentations generated a part of this project.

  11. Space tug applications. Final report

    SciTech Connect

    1996-01-01

    This article is the final report of the conceptual design efforts for a `space tug`. It includes preliminary efforts, mission analysis, configuration analysis, impact analysis, and conclusions. Of the several concepts evaluated, the nuclear bimodal tug was one of the top candidates, with the two options being the NEBA-1 and NEBA-3 systems. Several potential tug benefits were identified during the mission analysis. The tug enables delivery of large (>3,500 kg) payloads to the outer planets and it increases the GSO delivery capability by 20% relative to current systems. By providing end of life disposal, the tug can be used to extend the life of existing space assets. It can also be used to reboost satellites which were not delivered to their final orbit by the launch system. A specific mission model is the key to validating the tug concept. Once a mission model can be established, mission analysis can be used to determine more precise propellant quantities and burn times. In addition, the specific payloads can be evaluated for mass and volume capability with the launch systems. Results of the economic analysis will be dependent on the total years of operations and the number of missions in the mission model. The mission applications evaluated during this phase drove the need for large propellant quantities and thus did not allow the payloads to step down to smaller and less expensive launch systems.

  12. (Wind electric systems). Final report

    SciTech Connect

    Sencenbaugh, J.R.

    1981-06-01

    This report details the results of a demonstration project, the design and testing of a low power, high reliability wind electric system for remote, stand-alone locations. The study consisted of two basic areas. An engineering redesign of a sucessful preproduction prototype to determine best material usage in castings and manufacturing time, in addition to evaluating performance vs cost tradeoffs in design. The second stage of the program covered actual field testing of the redesigned machine in remote areas. After field testing, the machine was to undertake a final redesign to correct any weak areas found during the field evaluation period. Three machines of this design were tested throughout various regions of the United States. These units were located in Nederland, Colorado, Whidbey Island, Washington and Fort Cronkite, San Francisco, CA. The results obtained from prolonged testing were both varied and valuable. A detailed structural analysis was done during the preliminary redesign and final design stages of this program. This report is organized in chronological order.

  13. The Final Stages of Life

    NASA Astrophysics Data System (ADS)

    Winget, D.

    2014-04-01

    The overwhelming majority of all stars end their lives as white dwarf stars. These stars and their environs have a deep personal significance for humanity: this is the expected fate of our own sun. Once a star becomes a white dwarf, its remaining evolution is best described as an exponential cooling. In the final throws of post-main sequence mass-loss the former stellar core becomes a white dwarf, emerging phoenix-like from amongst the ashes. Some planets may survive and others may form as a sort of second generation from the cast-off material. Life may survive or may be reborn on any planets that remain; life may also arise on newly formed planets. The prospects will depend in a significant way on the timescales of the central white dwarf star's cooling evolution and how its radiation shapes the environment. We will discuss white dwarf evolutionary timescales with an eye towards the potential habitability of planets, both new and old. We will consider the uncertainties in these timescales from both an empirical and a theoretical perspective. We will critique the existing evidence for planets and summarize what we have learned so far through direct imaging and stellar pulsations. We will close with the very bright prospects for the future of planets and life in the final stages.

  14. 78 FR 47048 - Notice of Availability of Final Environmental Impact Statement (Final EIS)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Availability of Final Environmental Impact Statement (Final EIS) AGENCY: Federal Aviation Administration. ACTION: Notice of availability of Final EIS. SUMMARY:...

  15. 78 FR 14318 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may...

  16. 78 FR 21143 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  17. 78 FR 52954 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  18. 78 FR 52953 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  19. 78 FR 5820 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  20. 78 FR 5821 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  1. 78 FR 45938 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  2. 78 FR 45937 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  3. 78 FR 9406 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  4. 78 FR 43905 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  5. 78 FR 14316 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  6. 78 FR 43904 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  7. 78 FR 20337 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  8. 78 FR 20338 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  9. 78 FR 14577 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  10. 78 FR 14576 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  11. 78 FR 36216 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  12. 78 FR 36219 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  13. 78 FR 29762 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-21

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  14. 78 FR 36220 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  15. 78 FR 32678 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  16. 78 FR 32679 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  17. 78 FR 64521 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  18. 78 FR 29761 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-21

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  19. 78 FR 43904 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  20. 78 FR 29763 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-21

    ... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard...

  1. Final RQ adjustments rule issued

    SciTech Connect

    Bergeson, L.L.

    1995-08-01

    On June 12, 1995, the US Environmental Protection Agency (EPA) issued its long awaited final rule adjusting certain reportable quantities (RQs) for hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The rule: revises the table of hazardous substances to add 47 individual Clean Air Act (CAA) hazardous air pollutants (HAPs); adjustments their statutory one-pound RQs; adds five other CAA HAPs that are categories of substances and assigns no RQ to the categories; and adjusts RQs for 11 Resource Conservation and Recovery Act (RCRA) listed hazardous wastes. EPA made conforming changes to the Clean Water Act table of hazardous substances and the Emergency Planning and Community Right-to-Know Act (EPCRA) table of extremely hazardous substances. The rule became effective July 12, 1995.

  2. Strategic Asia 2002 Final Report

    SciTech Connect

    Richard Ellings; Aaron Friedberg; Michael Wills

    2002-09-01

    The Strategic Asia Program made considerable progress over the course of 2002--the program's first year with support from the Department of Energy--and completed all its tasks on schedule and within budget. Following a planning meeting in Washington in February 2002, a team of leading specialists wrote a series of original assessments regarding the impact of September 11 on the strategic environment in Asia, examining how perceptions and strategies of countries in the region changed following the terrorist attacks. The final products, Strategic Asia 2002-03: Asian Aftershocks and its accompanying executive summary, were published in September 2002. The program's research findings (some of which are summarized) were presented to policymakers in Washington and elsewhere throughout the year, and almost 2,000 copies of the book had been distributed by mid-2003.

  3. 16 CFR 1.12 - Final notice.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Final notice. 1.12 Section 1.12 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE GENERAL PROCEDURES Rules and Rulemaking Under Section 18(a)(1)(B) of the FTC Act § 1.12 Final notice. A final notice...

  4. 40 CFR 750.21 - Final rule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Final rule. 750.21 Section 750.21... Manufacturing Exemptions § 750.21 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. The Agency shall also publish at that time: (1) A list...

  5. 40 CFR 750.41 - Final rule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Final rule. 750.41 Section 750.41... Processing and Distribution in Commerce Exemptions § 750.41 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, EPA will issue a final rule. EPA will also publish at that...

  6. 40 CFR 750.41 - Final rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Final rule. 750.41 Section 750.41... Processing and Distribution in Commerce Exemptions § 750.41 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, EPA will issue a final rule. EPA will also publish at that...

  7. 40 CFR 750.21 - Final rule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Final rule. 750.21 Section 750.21... Manufacturing Exemptions § 750.21 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. The Agency shall also publish at that time: (1) A list...

  8. 40 CFR 750.41 - Final rule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Final rule. 750.41 Section 750.41... Processing and Distribution in Commerce Exemptions § 750.41 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, EPA will issue a final rule. EPA will also publish at that...

  9. 40 CFR 750.21 - Final rule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Final rule. 750.21 Section 750.21... Manufacturing Exemptions § 750.21 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. The Agency shall also publish at that time: (1) A list...

  10. 40 CFR 750.21 - Final rule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Final rule. 750.21 Section 750.21... Manufacturing Exemptions § 750.21 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. The Agency shall also publish at that time: (1) A list...

  11. 40 CFR 750.21 - Final rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Final rule. 750.21 Section 750.21... Manufacturing Exemptions § 750.21 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, the Agency shall issue a final rule. The Agency shall also publish at that time: (1) A list...

  12. 40 CFR 750.41 - Final rule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Final rule. 750.41 Section 750.41... Processing and Distribution in Commerce Exemptions § 750.41 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, EPA will issue a final rule. EPA will also publish at that...

  13. 40 CFR 750.41 - Final rule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Final rule. 750.41 Section 750.41... Processing and Distribution in Commerce Exemptions § 750.41 Final rule. (a) As soon as feasible after the deadline for submittal of reply comments, EPA will issue a final rule. EPA will also publish at that...

  14. 25 CFR 11.709 - Final account.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Final account. 11.709 Section 11.709 Indians BUREAU OF... Probate Proceedings § 11.709 Final account. (a) When the affairs of an estate have been fully administered, the executor or administrator shall file a final account with the court, verified by his or her...

  15. 25 CFR 11.709 - Final account.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Final account. 11.709 Section 11.709 Indians BUREAU OF... Probate Proceedings § 11.709 Final account. (a) When the affairs of an estate have been fully administered, the executor or administrator shall file a final account with the court, verified by his or her...

  16. 40 CFR 22.31 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Final order. 22.31 Section 22.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CONSOLIDATED RULES OF PRACTICE GOVERNING THE ADMINISTRATIVE ASSESSMENT OF CIVIL PENALTIES AND THE REVOCATION/TERMINATION OR SUSPENSION OF PERMITS Final Order § 22.31 Final order. (a)...

  17. 40 CFR 22.31 - Final order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Final order. 22.31 Section 22.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CONSOLIDATED RULES OF PRACTICE GOVERNING THE ADMINISTRATIVE ASSESSMENT OF CIVIL PENALTIES AND THE REVOCATION/TERMINATION OR SUSPENSION OF PERMITS Final Order § 22.31 Final order. (a)...

  18. 10 CFR 820.32 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Final order. 820.32 Section 820.32 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES Enforcement Process § 820.32 Final order. (a) Effect of Initial Decision. The Initial Decision shall be deemed filed as a Final Order thirty days...

  19. 25 CFR 575.9 - Final assessment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Final assessment. 575.9 Section 575.9 Indians NATIONAL... § 575.9 Final assessment. (a) If the respondent fails to request a hearing as provided in part 577 of this chapter, the proposed civil fine assessment shall become a final order of the Commission....

  20. 25 CFR 575.9 - Final assessment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Final assessment. 575.9 Section 575.9 Indians NATIONAL... § 575.9 Final assessment. (a) If the respondent fails to request a hearing as provided in part 577 of this chapter, the proposed civil fine assessment shall become a final order of the Commission....

  1. 25 CFR 575.9 - Final assessment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Final assessment. 575.9 Section 575.9 Indians NATIONAL... § 575.9 Final assessment. (a) If the respondent fails to request a hearing as provided in part 577 of this chapter, the proposed civil fine assessment shall become a final order of the Commission....

  2. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Final action. 92.17 Section 92.17 Money and Finance: Treasury Regulations Relating to Money and Finance UNITED STATES MINT OPERATIONS AND... States Mint § 92.17 Final action. (a) In making a final determination whether to impose a penalty,...

  3. 27 CFR 72.39 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Final action. 72.39... Remission or Mitigation of Forfeitures § 72.39 Final action. (a) Petitions for remission or mitigation of forfeiture. (1) The Director shall take final action on any petition filed pursuant to these...

  4. 33 CFR 52.64 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Final action. 52.64 Section 52.64... OF MILITARY RECORDS OF THE COAST GUARD Judgment and Disposition § 52.64 Final action. (a) The Board, provided that it acts unanimously, may take final action on behalf of the Secretary, pursuant to 10...

  5. 19 CFR 351.210 - Final determination.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Final determination. 351.210 Section 351.210 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING DUTIES Antidumping and Countervailing Duty Procedures § 351.210 Final determination. (a) Introduction. A “final determination” in an antidumping...

  6. 25 CFR 575.9 - Final assessment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Final assessment. 575.9 Section 575.9 Indians NATIONAL... § 575.9 Final assessment. (a) If the respondent fails to request a hearing as provided in part 577 of this chapter, the proposed civil fine assessment shall become a final order of the Commission....

  7. 10 CFR 820.42 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Final order. 820.42 Section 820.42 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES Compliance Orders § 820.42 Final order. A Compliance Order is a Final Order that constitutes a DOE Nuclear Safety Requirement that is effective...

  8. 14 CFR 1214.1105 - Final ranking.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Final ranking. 1214.1105 Section 1214.1105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT NASA Astronaut Candidate Recruitment and Selection Program § 1214.1105 Final ranking. Final rankings will be based on a combination...

  9. 14 CFR 1214.1105 - Final ranking.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Final ranking. 1214.1105 Section 1214.1105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT NASA Astronaut Candidate Recruitment and Selection Program § 1214.1105 Final ranking. Final rankings will be based on a combination...

  10. 14 CFR 1214.1105 - Final ranking.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Final ranking. 1214.1105 Section 1214.1105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT NASA Astronaut Candidate Recruitment and Selection Program § 1214.1105 Final ranking. Final rankings will be based on a combination...

  11. 14 CFR 1214.1105 - Final ranking.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Final ranking. 1214.1105 Section 1214.1105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT NASA Astronaut Candidate Recruitment and Selection Program § 1214.1105 Final ranking. Final rankings will be based on a combination...

  12. 40 CFR 24.18 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator modifies the recommended decision, he shall insure that the final decision indicates the legal and... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Final decision. 24.18 Section 24.18... ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.18 Final...

  13. 10 CFR 820.32 - Final order.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Final order. 820.32 Section 820.32 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES Enforcement Process § 820.32 Final order. (a) Effect of Initial Decision. The Initial Decision shall be deemed filed as a Final Order thirty days...

  14. 49 CFR 190.213 - Final order.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Final order. 190.213 Section 190.213... REGULATORY PROCEDURES Enforcement § 190.213 Final order. Link to an amendment published at 78 FR 58911... commenced under § 190.207 is forwarded to the Associate Administrator, OPS for issuance of a final order....

  15. 10 CFR 820.67 - Final order.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Final order. 820.67 Section 820.67 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES Exemption Relief § 820.67 Final order. If no filing is made under § 820.66, an exemption decision becomes a Final Order fifteen (15) days after it is filed...

  16. 10 CFR 820.32 - Final order.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Final order. 820.32 Section 820.32 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES Enforcement Process § 820.32 Final order. (a) Effect of Initial Decision. The Initial Decision shall be deemed filed as a Final Order thirty days...

  17. 10 CFR 820.42 - Final order.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Final order. 820.42 Section 820.42 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES Compliance Orders § 820.42 Final order. A Compliance Order is a Final Order that constitutes a DOE Nuclear Safety Requirement that is effective...

  18. 49 CFR 190.213 - Final order.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Final order. 190.213 Section 190.213... PROCEDURES Enforcement § 190.213 Final order. (a) After a hearing under § 190.211 or, if no hearing has been... of a final order. (b) The case file of an enforcement proceeding commenced under § 190.207...

  19. 32 CFR 536.64 - Final offers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Final offers. 536.64 Section 536.64 National... UNITED STATES Investigation and Processing of Claims § 536.64 Final offers. (a) When claims personnel... less than the amount claimed, a settlement authority will make a written final offer within his or...

  20. 49 CFR 106.30 - Final rule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Final rule. 106.30 Section 106.30 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION... Rulemaking Documents § 106.30 Final rule. A final rule sets out new regulatory requirements and...

  1. 49 CFR 106.30 - Final rule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Final rule. 106.30 Section 106.30 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION... Rulemaking Documents § 106.30 Final rule. A final rule sets out new regulatory requirements and...

  2. 49 CFR 106.30 - Final rule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Final rule. 106.30 Section 106.30 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION... Rulemaking Documents § 106.30 Final rule. A final rule sets out new regulatory requirements and...

  3. 49 CFR 106.30 - Final rule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Final rule. 106.30 Section 106.30 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION... Rulemaking Documents § 106.30 Final rule. A final rule sets out new regulatory requirements and...

  4. 49 CFR 106.30 - Final rule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Final rule. 106.30 Section 106.30 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION... Rulemaking Documents § 106.30 Final rule. A final rule sets out new regulatory requirements and...

  5. Advanced Design Studies. Final report

    SciTech Connect

    Steiner, Don

    2012-12-01

    The ARIES-CS project was a multi-year multi-institutional project to assess the feasibility of a compact stellarator as a fusion power plant. The work herein describes efforts to help design one aspect of the device, the divertor, which is responsible for the removal of particle and heat flux from the system, acting as the first point of contact between the magnetically confined hot plasma and the outside world. Specifically, its location and topology are explored, extending previous work on the sub ject. An optimized design is determined for the thermal particle flux using a suite of 3D stellarator design codes which trace magnetic field lines from just inside the confined plasma edge to their strike points on divertor plates. These divertor plates are specified with a newly developed plate design code. It is found that a satisfactory thermal design exists which maintains the plate temperature and heat load distribution below tolerable engineering limits. The design is unique, including a toroidal taper on the outboard plates which was found to be important to our results. The maximum thermal heat flux for the final design was 3.61 M W/m2 and the maximum peaking factor was 10.3, below prescribed limits of 10 M W/m2 and 15.6, respectively. The median length of field lines reaching the plates is about 250 m and their average angle of inclination to the surface is 2 deg. Finally, an analysis of the fast alphas, resulting from fusion in the core, which escape the plasma was performed. A method is developed for obtaining the mapping from magnetic coordinates to real-space coordinates for the ARIES-CS. This allows the alpha exit locations to be identified in real space for the first time. These were then traced using the field line algorithm as well as a guiding center routine accounting for their mass, charge, and specific direction and energy. Results show that the current design is inadequate for accommodating the alpha heat flux, capturing at most 1/3 of lost alphas

  6. IRIS Final Technical Progress Report

    SciTech Connect

    M. D. Carelli

    2003-11-03

    OAK-B135 This NERI project, originally started as the Secure Transportable Autonomous Light Water Reactor (STAR-LW) and currently known as the International Reactor Innovative and Secure (IRIS) project, had the objective of investigating a novel type of water-cooled reactor to satisfy the Generation IV goals: fuel cycle sustainability, enhanced reliability and safety, and improved economics. The research objectives over the three-year (1999-2002) program were as follows: First year: Assess various design alternatives and establish main characteristics of a point design; Second year: Perform feasibility and engineering assessment of the selected design solutions; Third year: Complete reactor design and performance evaluation, including cost assessment These objectives were fully attained and actually they served to launch IRIS as a full fledged project for eventual commercial deployment. The program did not terminate in 2002 at the end of the NERI program, and has just entered in its fifth year. This has been made possible by the IRIS project participants which have grown from the original four member, two-countries team to the current twenty members, nine countries consortium. All the consortium members work under their own funding and it is estimated that the value of their in-kind contributions over the life of the project has been of the order of $30M. Currently, approximately 100 people worldwide are involved in the project. A very important constituency of the IRIS project is the academia: 7 universities from four countries are members of the consortium and five more US universities are associated via parallel NERI programs. To date, 97 students have worked or are working on IRIS; 59 IRIS-related graduate theses have been prepared or are in preparation, and 41 of these students have already graduated with M.S. (33) or Ph.D. (8) degrees. This ''final'' report (final only as far as the NERI program is concerned) summarizes the work performed in the first four

  7. FINAL SCIENTIFIC/TECHNICAL REPORT

    SciTech Connect

    Satish Mohapatra

    2011-12-21

    Dynalene Inc has developed and patented a fuel cell coolant with the help of DOE SBIR Phase I and Phase II funding (Project DE-FG02-04ER83884). However, this coolant could only be produced in lab scale (500 ml to 2 L) due to problems in the optimization and scale-up of a nanoparticle ingredient. This project optimized the nanoparticle production process in 10 L and 100 L reactors (which translates to about 5000 gallons of coolant), optimized the filtration process for the nanoparticles, and develop a high throughput production as well as quality control method for the final coolant formulation. Scale-up of nanoparticle synthesis (using emulsion polymerization) is an extremely challenging task. Dynalene researchers, in collaboration with a university partner, identified all the parameters affecting the size, charge density and coagulation characteristics of the nanoparticles and then optimized these parameters to achieve the goals and the objectives of this project. Nanoparticle synthesis was demonstrated to be reproducible in the 10 L and 100 L scales.

  8. Final Report for OJI grant.

    SciTech Connect

    Todd Averett

    2006-10-13

    This document is a final report for DOE grant DE-FG02-00ER41147. The research described herein was funded in large part by this grant with additional support from the National Science Foundation. The primary focus of Averett's research effort is centered around the polarized {sup 3}He target in Hall A at Jefferson Lab. The close proximity of the College of William and Mary to Jefferson Lab has provided an outstanding opportunity to maintain a very active research program which still satisfying the demands of the college. Our research group includes four faculty, two post-doctoral fellows and eight graduate students. Averett also maintains a fully functional polarized {sup 3}e target lab at William and Mary which allows him to support the research program at Jefferson Lab while also doing research on polarized targets themselves. Since 1998, seven experiments using polarized {sup 3}He have been completed by the Jefferson Lab Hall A Polarized {sup 3}He Collaboration. Ten publications have been produced on this research and analysis of the two most recently completed experiments is underway. A description of the recent experiments and results is given below. In addition to target expertise, Averett has remained one of the most active collaborators in the data analysis of these experiments and maintains the largest on-site user group for this purpose as well.

  9. Demand Side Bidding. Final Report

    SciTech Connect

    Spahn, Andrew

    2003-12-31

    This document sets forth the final report for a financial assistance award for the National Association of Regulatory Utility Commissioners (NARUC) to enhance coordination between the building operators and power system operators in terms of demand-side responses to Location Based Marginal Pricing (LBMP). Potential benefits of this project include improved power system reliability, enhanced environmental quality, mitigation of high locational prices within congested areas, and the reduction of market barriers for demand-side market participants. NARUC, led by its Committee on Energy Resources and the Environment (ERE), actively works to promote the development and use of energy efficiency and clean distributive energy policies within the framework of a dynamic regulatory environment. Electric industry restructuring, energy shortages in California, and energy market transformation intensifies the need for reliable information and strategies regarding electric reliability policy and practice. NARUC promotes clean distributive generation and increased energy efficiency in the context of the energy sector restructuring process. NARUC, through ERE's Subcommittee on Energy Efficiency, strives to improve energy efficiency by creating working markets. Market transformation seeks opportunities where small amounts of investment can create sustainable markets for more efficient products, services, and design practices.

  10. Oklahoma seismic network. Final report

    SciTech Connect

    Luza, K.V.; Lawson, J.E. Jr. |

    1993-07-01

    The US Nuclear Regulatory Commission has established rigorous guidelines that must be adhered to before a permit to construct a nuclear-power plant is granted to an applicant. Local as well as regional seismicity and structural relationships play an integral role in the final design criteria for nuclear power plants. The existing historical record of seismicity is inadequate in a number of areas of the Midcontinent region because of the lack of instrumentation and (or) the sensitivity of the instruments deployed to monitor earthquake events. The Nemaha Uplift/Midcontinent Geophysical Anomaly is one of five principal areas east of the Rocky Mountain front that has a moderately high seismic-risk classification. The Nemaha uplift, which is common to the states of Oklahoma, Kansas, and Nebraska, is approximately 415 miles long and 12-14 miles wide. The Midcontinent Geophysical Anomaly extends southward from Minnesota across Iowa and the southeastern corner of Nebraska and probably terminates in central Kansas. A number of moderate-sized earthquakes--magnitude 5 or greater--have occurred along or west of the Nemaha uplift. The Oklahoma Geological Survey, in cooperation with the geological surveys of Kansas, Nebraska, and Iowa, conducted a 5-year investigation of the seismicity and tectonic relationships of the Nemaha uplift and associated geologic features in the Midcontinent. This investigation was intended to provide data to be used to design nuclear-power plants. However, the information is also being used to design better large-scale structures, such as dams and high-use buildings, and to provide the necessary data to evaluate earthquake-insurance rates in the Midcontinent.

  11. Electric chiller handbook. Final report

    SciTech Connect

    Smith, K.; Keder, J.; Tidball, R.

    1996-02-01

    Electric chillers have dominated the market for large commercial cooling systems due to their history of reliable, economical operation. This handbook provides a comprehensive guide for use in selecting chillers for commercial cooling needs. Key issues include chiller availability, rated performance, future viability of various refrigerant options, the cost-effectiveness of alternative chillers, and chilled-water system optimization. Investigators used a variety of industry data sources to develop market share information for electric and gas chiller systems and to determine applications according to building type, age, and region. Discussions with chiller manufacturers provided information on product availability, performance, and ownership cost. Using EPRI`s COMTECH software, investigators performed comprehensive cost analyses for placement of large and small chillers in three representative cities. Case studies of actual installations support these analyses. EPRI`s Electric Chiller Handbook provides a single source of current information on all major issues associated with chiller selection and application. Key issues include chiller availability and markets, rated performance, future viability of various refrigerant options, the cost-effectiveness of alternative chillers, and chilled-water system optimization. The handbook also describes available hardware, outlines the features and costs of gas-fired competitive systems, and provides methods and comparisons of life-cycle costing of various chiller system options. Analyses of chiller features and economics show that electric chillers are preferable to gas chillers in the large majority of applications, consistent with current market trends. Furthermore, today`s chillers offer a wide range of efficiencies and refrigerant options to serve cooling system needs for the 20-year lifetime of the chiller. Finally, new higher-efficiency models of electric chillers offer very attractive paybacks.

  12. The behavioural final common path.

    PubMed

    McFarland, D J; Sibly, R M

    1975-05-15

    In this paper it is argued that any model of the motivational (i.e. reversible) processes governing the behaviour of an animal can be represented by means of isoclines in a multidimensional 'causal-factor space'. The argument is axiomatic, based upon the two prime assumptions: that (1) it is always possible to classify the behavioural repertoire of a species in such a way that the classes are mutually exclusive in the sense that the members of different classes cannot occur simultaneously, and (2) these incompatible actions are uniquely determined by a particular set of causal factors. The isoclines join all points in the space which present a given 'degree of competitiveness' of a particular 'candidate' for overt behavioural expression. The competition between candidates is an inevitable consequence of the fact that animals cannot 'do more than one thing at a time', and is envisaged as taking place in the behavioural final common path. An empirical method of determining the motivational state (i.e. point in causal-factor space) is outlined. This is a 'relative' method, independent of the arbitrary calibration of the axes of the causal-factor space. It is shown that an arbitrary scale of measurement along any two axes of the causal-factor space is all that is necessary for empirical determination of the shape of a motivational isocline. Experiments in which this method has been applied to the measurement of hunger and thirst in doves are outlined, and the results are discussed in terms of their implications for motivation theory in general. PMID:239416

  13. International Ultraviolet Explorer Final Archive

    NASA Technical Reports Server (NTRS)

    1997-01-01

    CSC processed IUE images through the Final Archive Data Processing System. Raw images were obtained from both NDADS and the IUEGTC optical disk platters for processing on the Alpha cluster, and from the IUEGTC optical disk platters for DECstation processing. Input parameters were obtained from the IUE database. Backup tapes of data to send to VILSPA were routinely made on the Alpha cluster. IPC handled more than 263 requests for priority NEWSIPS processing during the contract. Staff members also answered various questions and requests for information and sent copies of IUE documents to requesters. CSC implemented new processing capabilities into the NEWSIPS processing systems as they became available. In addition, steps were taken to improve efficiency and throughput whenever possible. The node TORTE was reconfigured as the I/O server for Alpha processing in May. The number of Alpha nodes used for the NEWSIPS processing queue was increased to a maximum of six in measured fashion in order to understand the dependence of throughput on the number of nodes and to be able to recognize when a point of diminishing returns was reached. With Project approval, generation of the VD FITS files was dropped in July. This action not only saved processing time but, even more significantly, also reduced the archive storage media requirements, and the time required to perform the archiving, drastically. The throughput of images verified through CDIVS and processed through NEWSIPS for the contract period is summarized below. The number of images of a given dispersion type and camera that were processed in any given month reflects several factors, including the availability of the required NEWSIPS software system, the availability of the corresponding required calibrations (e.g., the LWR high-dispersion ripple correction and absolute calibration), and the occurrence of reprocessing efforts such as that conducted to incorporate the updated SWP sensitivity-degradation correction in May.

  14. Final report on SNAC 11

    SciTech Connect

    Huber, Patrick

    2013-06-26

    This report details how the $5,000 DOE grant to support the workshop titled “Sterile Neutrinos at the Crossroads” (or SNAC11) was allocated and spent. The SNAC11 workshop covered three days during which there were 28 talks, multiple discussion sessions, a poster session with 9 posters delivered, and an impromptu public lecture on the OPERA superluminal neutrino result by the former project manager of OPERA (this was the first official OPERA talk on the subject in North America). The workshop scientific agenda can be viewed at http://www.cpe.vt.edu/snac/program.html. Emerging out of the workshop discussions, was the idea to write a comprehensive white paper describing the current state of the light sterile neutrino. This effort soon became an international collaboration. The final document, titled “Light Sterile Neutrinos: A White Paper” has nearly 200 authors, is 267 pages long, and cites 730 unique references. It has been posted the preprint archive as arXiv:1204.5379 [hep-ph]. Workshop local organizing committee co-chairs, Patrick Huber and Jonathan Link, are the white paper’s head editors. The white paper’s sections and section editors are as follows: 1. Theory and Motivation (Gabriela Barenboim, Valencia and Werner Rodejohann, MPI Heidelberg) 2. Astrophysical Evidence (Kev Abazajian, UC Irvine and Yvonne Wong, Aachen) 3. Evidence from Oscillation Experiments (Joachim Kopp, FNAL and Bill Louis, LANL) 4. Global Picture (Thierry Lasserre, CEA Saclay and Thomas Schwetz, MPI Heidelberg) 5. Requirements for Future Measurements (Bonnie Fleming, Yale and Joe Formaggio, MIT) 6. Appendix: Possible Future Experiments (Patrick Huber, Virginia Tech and Jon Link, Virginia Tech) In all 56 people participated in the workshop, of these 11 were young scientists. The workshop was covered in a feature article in Science (Science, 334, (2011), 304-306.). The DOE award was spent, as budgeted, as contractual services to VT CPE, which is the unit within the University

  15. Threat displays for final approach

    NASA Astrophysics Data System (ADS)

    Jennings, Chad Warren

    During periods of good visibility, airports can conduct Closely Spaced Parallel Approaches (CSPA) and simultaneously operate parallel runways separated by more than 750 feet. When visibility degrades to Instrument Meteorological Conditions (IMC) and pilots must fly exclusively by the instruments, the runway separation required to operate parallel runways increases to 3400 feet or more. For many airports around the country and the world this means the second runway must be closed and the airport operates at half capacity. To alleviate the delays caused by this capacity reduction many airports worldwide are planning to expand and build new runways. The projected cost of the ten largest airport projects in the United States is $8-16 Billion. Perhaps a less expensive solution can be found with innovative technology rather than real estate? This research presents the first ever design, implementation, and characterization of a synthetic vision display and the supporting flight system to attempt to achieve this solution. The display uses 3D graphics and an air to air datalink called Automatic Dependent Surveillance--Broadcast to present the pilot with the information necessary to aviate, navigate and monitor traffic. This thesis also documents the first series of flight experiments to test the applicability of synthetic vision displays to both runway incursion avoidance and CSPA. Finally, utilizing the results from the flight testing in a Monte Carlo analysis, the effect of deploying this display on minimum safe runway separation is calculated. It has been found that the minimum safe runway separation for IMC operation can safely be reduced to 1900 feet. If, in addition, significant changes are made in Air Traffic Control procedures for longitudinal aircraft spacing, the analysis shows that the display system presented herein will allow for runway separation of 1400 feet with no new restrictions on aircraft size or crosswind. Furthermore, with certain restrictions on

  16. Electric chiller handbook. Final report

    SciTech Connect

    1998-02-01

    that electric chillers are preferable to gas chillers in the large majority of applications, consistent with current market trends. Furthermore, today`s chillers offer a wide range of efficiencies and refrigerant options to serve cooling system needs for the 20-year lifetime of the chiller. Finally, new higher-efficiency models of electric chillers offer very attractive paybacks.

  17. Santa Barbara Final Technical Report

    SciTech Connect

    Hacker, Angela; Hansen, Sherman; Watkins, Ashley

    2013-11-30

    This report serves as the Final Report for Santa Barbara County’s Energy Efficiency and Conservation Block Grant (EECBG) BetterBuildings Neighborhood Program (BBNP) award from the U.S. Department of Energy (DOE). This report explains how DOE BBNP funding was invested to develop robust program infrastructure designed to help property owners complete energy improvements, thereby generating substantial outcomes for the local environment and economy. It provides an overview of program development and design within the grant period, program accomplishments and challenges to date, and a plan for the future sustainability of emPower, the County’s innovative clean energy and building efficiency program. During the grant period, Santa Barbara County’s emPower program primarily targeted 32,000 owner occupied, single family, detached residential homes over 25 years old within the County. In order to help these homeowners and their contractors overcome market barriers to completing residential energy improvements, the program developed and promoted six voluntary, market-based service areas: 1) low cost residential financing (loan loss reserve with two local credit unions), 2) residential rebates, 3) local customer service, 4) expert energy advising, 5) workforce development and training, and 6) marketing, education and outreach. The main goals of the program were to lower building energy use, create jobs and develop a lasting regional building performance market. These services have generated important early outcomes and lessons after the program’s first two years in service. The DOE BBNP funding was extended through October 2014 to enable Santa Barbara County to generate continued outcomes. In fact, funding related to residential financing remains wholly available for the foreseeable future to continue offering Home Upgrade Loans to approximately 1,300 homeowners. The County’s investment of DOE BBNP funding was used to build a lasting, effective, and innovative

  18. Large Block Test Final Report

    SciTech Connect

    Lin, W

    2001-12-01

    . Sections 5 through 9 report the measurements made on the block during the preheating, heating, and cooling phases. These measurements include temperature, thermal conductivity and diffusivity, hydrological measurements (electrical resistivity, neutron logging, gas pressure, and relative humidity), geomechanics, selected chemical analyses, and microbial activity. These sections also include analyses and simulations of the block behavior. Finally, conclusions are presented in Section 10. Complete data sets were submitted during the time the test was conducted. The data tracking numbers (DTNs) of all of the data are presented in Table 1-1.

  19. Final Report Package_Winnebago

    SciTech Connect

    Carolyn Stewart, Director, Red Mountain Energy Partners

    2006-10-31

    The Winnebago Tribe of Nebraska energy options study results will be used to advance the Tribe’s near term energy management objectives. The array of energy options identified allows the Tribe to select those activities that best fit its energy strategies, goals and objectives. During the course of the study, Red Mountain analyzed both energy options and energy organizational alternatives suitable for the Tribe, presented findings to the Tribal Council, and made recommendations regarding each. Work products delivered to the Tribe, and provided in the Final Report included: • A matrix of energy management options applicable to the Tribe, which provided descriptions of particular conservation, efficiency, weatherization, and demand management alternatives. The matrix also provided insight about relative costs of the alternatives, cost/benefit efficacy, ease of implementation, resources for implementing, and observations about each. • A matrix of utility service options applicable to the Tribe, describing each of the four alternatives described above. The matrix also provided insight about key benefits of each option, required resources, costs and timeframe for implementation, funding sources and analysis, and key issues for consideration. • Discussion guides prepared for each meeting between the Energy Committee and Council, and the Tribe’s contractor, Red Mountain Energy Partners, which included preliminary analysis and findings. • A Position Description for the Energy Manager position, which was reviewed by the Tribal HR Department, and used by the Tribe to develop a position posting. • A Utility Code designed for Winnebago to use in establishing its Utility Board, and, ultimately, to provide guidance for the Board’s further development. • A project summary book developed to include all key information, deliverables and utility provider data for the project. Winnebago’s growth trends and expansion plans require the Tribe to play a more active

  20. 14 CFR 314.16 - Final determination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Final determination. 314.16 Section 314.16 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) PROCEDURAL REGULATIONS EMPLOYEE PROTECTION PROGRAM Determination of Qualifying Dislocation § 314.16 Final...

  1. 7 CFR 718.306 - Finality.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 7 2012-01-01 2012-01-01 false Finality. 718.306 Section 718.306 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE FARM... Equitable Relief From Ineligibility § 718.306 Finality. (a) A determination by a State or county...

  2. 7 CFR 718.306 - Finality.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Finality. 718.306 Section 718.306 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE FARM... Equitable Relief From Ineligibility § 718.306 Finality. (a) A determination by a State or county...

  3. 7 CFR 718.306 - Finality.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Finality. 718.306 Section 718.306 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE FARM... Equitable Relief From Ineligibility § 718.306 Finality. (a) A determination by a State or county...

  4. Indian Child Welfare Act Proceedings. Final rule.

    PubMed

    2016-06-14

    This final rule adds a new subpart to the Department of the Interior's (Department) regulations implementing the Indian Child Welfare Act (ICWA), to improve ICWA implementation. The final rule addresses requirements for State courts in ensuring implementation of ICWA in Indian child-welfare proceedings and requirements for States to maintain records under ICWA. PMID:27311136

  5. Shaving Ceramic Tiles To Final Dimensions

    NASA Technical Reports Server (NTRS)

    Shaw, Ernest

    1992-01-01

    Combination of template and routing tool cuts ceramic tiles to final dimensions. Template guides router along precisely defined planes to accurately and uniformly shave chamfers on edge of tiles. Legs of template temporarily bonded to workpiece by double-backed adhesive tape. Adaptable to in-situ final machining of other nominally flat, narrow surfaces.

  6. 50 CFR 296.11 - Final determination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 9 2011-10-01 2011-10-01 false Final determination. 296.11 Section 296.11 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE CONTINENTAL SHELF FISHERMEN'S CONTINGENCY FUND § 296.11 Final determination. (a) If...

  7. 40 CFR 24.19 - Final order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Final order. 24.19 Section 24.19 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.19 Final order. If the Regional Administrator does not...

  8. 40 CFR 24.19 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Final order. 24.19 Section 24.19 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.19 Final order. If the Regional Administrator does not...

  9. 22 CFR 223.10 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Final decision. 223.10 Section 223.10 Foreign... RESTRICTIONS § 223.10 Final decision. (a) In cases where the former employee failed to request a hearing after... gathered to date, including any written reply of the former employee. (b) In cases of appeal under §...

  10. 22 CFR 223.10 - Final decision.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Final decision. 223.10 Section 223.10 Foreign... RESTRICTIONS § 223.10 Final decision. (a) In cases where the former employee failed to request a hearing after... gathered to date, including any written reply of the former employee. (b) In cases of appeal under §...

  11. 31 CFR 223.20 - Final decisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Final decisions. 223.20 Section 223.20 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE... STATES § 223.20 Final decisions. If, after review of the case file, it is the judgment of the...

  12. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  13. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  14. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  15. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  16. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Final action. 2.64 Section 2... COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Examination of Application and Action by Applicants § 2.64 Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of...

  17. Common Errors in Calculating Final Grades

    ERIC Educational Resources Information Center

    Francis, Richard W.

    2006-01-01

    The author has discovered that errors in grades often occur when scores are combined for final marks. These errors are not related to the grading individual assignments. Rather, they occur when teachers at all grade levels bring individual test and assignment scores together for the students' final grades. Unfortunately, professors of mathematics…

  18. 75 FR 28497 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  19. 10 CFR 2.344 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Final decision. 2.344 Section 2.344 Energy NUCLEAR... Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings § 2.344 Final decision. (a) The Commission will ordinarily consider the whole record on...

  20. 5 CFR 831.1112 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Final decision. 831.1112 Section 831.1112 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Prohibition on Payments of Annuities § 831.1112 Final decision. (a) On appeal from or review of...

  1. 5 CFR 831.1112 - Final decision.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Final decision. 831.1112 Section 831.1112 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Prohibition on Payments of Annuities § 831.1112 Final decision. (a) On appeal from or review of...

  2. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  3. 21 CFR 1315.62 - Final order.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Final order. 1315.62 Section 1315.62 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Hearings § 1315.62 Final order. As soon as...

  4. 21 CFR 1315.62 - Final order.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Final order. 1315.62 Section 1315.62 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Hearings § 1315.62 Final order. As soon as...

  5. 21 CFR 1315.62 - Final order.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Final order. 1315.62 Section 1315.62 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Hearings § 1315.62 Final order. As soon as...

  6. 21 CFR 1315.62 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Final order. 1315.62 Section 1315.62 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Hearings § 1315.62 Final order. As soon as...

  7. 21 CFR 1315.62 - Final order.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Final order. 1315.62 Section 1315.62 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Hearings § 1315.62 Final order. As soon as...

  8. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  9. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  10. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  11. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  12. Techniques of final preseal visual inspection

    NASA Technical Reports Server (NTRS)

    Anstead, R. J.

    1975-01-01

    A dissertation is given on the final preseal visual inspection of microcircuit devices to detect manufacturing defects and reduce failure rates in service. The processes employed in fabricating monolithic integrated circuits and hybrid microcircuits, various failure mechanisms resulting from deficiencies in those processes, and the rudiments of performing final inspection are outlined.

  13. Freshwater Biological Traits Database (Final Report)

    EPA Science Inventory

    Cover of the Freshwater Biological Traits Database <span class=Final Report"> This final report discusses the development of a database of freshwater biolo...

  14. 11 CFR 9409.9 - Final determination.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 11 Federal Elections 1 2012-01-01 2012-01-01 false Final determination. 9409.9 Section 9409.9 Federal Elections ELECTION ASSISTANCE COMMISSION TESTIMONY BY COMMISSION EMPLOYEES RELATING TO OFFICIAL INFORMATION AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS § 9409.9 Final determination. The...

  15. 11 CFR 9409.9 - Final determination.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 11 Federal Elections 1 2013-01-01 2012-01-01 true Final determination. 9409.9 Section 9409.9 Federal Elections ELECTION ASSISTANCE COMMISSION TESTIMONY BY COMMISSION EMPLOYEES RELATING TO OFFICIAL INFORMATION AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS § 9409.9 Final determination. The...

  16. 11 CFR 9409.9 - Final determination.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 11 Federal Elections 1 2011-01-01 2011-01-01 false Final determination. 9409.9 Section 9409.9 Federal Elections ELECTION ASSISTANCE COMMISSION TESTIMONY BY COMMISSION EMPLOYEES RELATING TO OFFICIAL INFORMATION AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS § 9409.9 Final determination. The...

  17. 11 CFR 9409.9 - Final determination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Final determination. 9409.9 Section 9409.9 Federal Elections ELECTION ASSISTANCE COMMISSION TESTIMONY BY COMMISSION EMPLOYEES RELATING TO OFFICIAL INFORMATION AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS § 9409.9 Final determination. The...

  18. 11 CFR 9409.9 - Final determination.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 11 Federal Elections 1 2014-01-01 2014-01-01 false Final determination. 9409.9 Section 9409.9 Federal Elections ELECTION ASSISTANCE COMMISSION TESTIMONY BY COMMISSION EMPLOYEES RELATING TO OFFICIAL INFORMATION AND PRODUCTION OF OFFICIAL RECORDS IN LEGAL PROCEEDINGS § 9409.9 Final determination. The...

  19. 75 FR 23595 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  20. 75 FR 14091 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  1. 75 FR 34381 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  2. 75 FR 23608 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  3. 75 FR 23600 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  4. 45 CFR 1606.10 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Final decision. 1606.10 Section 1606.10 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION TERMINATION AND DEBARMENT PROCEDURES; RECOMPETITION § 1606.10 Final decision. (a) If neither the Corporation nor...

  5. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  6. Choctaw Workplace Literacy Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Mississippi Band of Choctaw Indians, Philadelphia.

    This document contains the final performance report, evaluation, and curriculum from a program that provided basic literacy instruction for employees of Chahta Enterprises in Mississippi. The final report describes development of curriculum materials that matched the reading and math tasks of production and quality control jobs; reading and math…

  7. 14 CFR 302.610 - Final order.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Final order. 302.610 Section 302.610... Final order. (a) When a complaint or request for determination stands submitted to the Secretary for... order, which will include a statement of the reasons for his or her findings and conclusions. Such...

  8. 21 CFR 1303.37 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Final order. 1303.37 Section 1303.37 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE QUOTAS Hearings § 1303.37 Final order. As... Administrator shall issue his order on the determination or adjustment of the aggregate production quota or...

  9. 21 CFR 1313.57 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Final order. 1313.57 Section 1313.57 Food and... LIST II CHEMICALS Hearings § 1313.57 Final order. As soon as practicable after the presiding officer has certified the record to the Administrator, the Administrator shall issue his order regarding...

  10. 14 CFR 302.610 - Final order.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Final order. 302.610 Section 302.610... Final order. (a) When a complaint or request for determination stands submitted to the Secretary for... order, which will include a statement of the reasons for his or her findings and conclusions. Such...

  11. 21 CFR 1301.46 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Final order. 1301.46 Section 1301.46 Food and..., AND DISPENSERS OF CONTROLLED SUBSTANCES Hearings § 1301.46 Final order. As soon as practicable after.../her order on the granting, denial, revocation, or suspension of registration. In the event that...

  12. 21 CFR 1308.45 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Final order. 1308.45 Section 1308.45 Food and... § 1308.45 Final order. As soon as practicable after the presiding officer has certified the record to the Administrator, the Administrator shall cause to be published in the Federal Register his order in the...

  13. 21 CFR 1312.47 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Final order. 1312.47 Section 1312.47 Food and... SUBSTANCES Hearings § 1312.47 Final order. As soon as practicable after the presiding officer has certified the record to the Administrator, the Administrator shall issue his order on the issuance or denial...

  14. 40 CFR 24.19 - Final order.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Final order. 24.19 Section 24.19... ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.19 Final order. If the Regional Administrator does not adopt portions of the initial order, or finds...

  15. 50 CFR 296.11 - Final determination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Final determination. 296.11 Section 296.11 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE CONTINENTAL SHELF FISHERMEN'S CONTINGENCY FUND § 296.11 Final determination. (a) If...

  16. 40 CFR 61.134 - Standard: Naphthalene processing, final coolers, and final-cooler cooling towers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS National Emission Standard for Benzene Emissions from Coke By-Product Recovery Plants § 61.134... are allowed from naphthalene processing, final coolers and final-cooler cooling towers at coke...

  17. 40 CFR 61.134 - Standard: Naphthalene processing, final coolers, and final-cooler cooling towers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS National Emission Standard for Benzene Emissions from Coke By-Product Recovery Plants § 61.134... are allowed from naphthalene processing, final coolers and final-cooler cooling towers at coke...

  18. 40 CFR 61.134 - Standard: Naphthalene processing, final coolers, and final-cooler cooling towers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... POLLUTANTS National Emission Standard for Benzene Emissions from Coke By-Product Recovery Plants § 61.134... are allowed from naphthalene processing, final coolers and final-cooler cooling towers at coke...

  19. 40 CFR 61.134 - Standard: Naphthalene processing, final coolers, and final-cooler cooling towers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... POLLUTANTS National Emission Standard for Benzene Emissions from Coke By-Product Recovery Plants § 61.134... are allowed from naphthalene processing, final coolers and final-cooler cooling towers at coke...

  20. 40 CFR 61.134 - Standard: Naphthalene processing, final coolers, and final-cooler cooling towers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... POLLUTANTS National Emission Standard for Benzene Emissions from Coke By-Product Recovery Plants § 61.134... are allowed from naphthalene processing, final coolers and final-cooler cooling towers at coke...

  1. DOE/EMSP--73914-Final

    SciTech Connect

    Roden, Eric E.; Urrutia, Matilde M.; Barnett, Mark O.; Lange, Clifford R.

    2005-07-18

    (VI) reduction is likely to be less efficient in natural soils and sediments than would be inferred from studies with synthetic Fe(III) oxides. A key implication of these findings is that production of Fe(II)-enriched sediments during one-time (or periodic) stimulation of DMRB activity is not likely to permit efficient long-term abiotic conversion of U(VI) to U(IV) in biogenic redox barriers designed to prevent far-field subsurface U(VI) migration. Instead our results suggest that ongoing DMRB activity will be required to achieve maximal U(VI) reduction efficiency, and emphasize the need for detailed understanding of patterns of DMRB growth, colonization, and maintenance in physically and chemically heterogeneous subsurface environments in order to predict the effectiveness of subsurface U(VI) bioremediation operations. A final ''capstone'' aspect of experimental work on the project was to examine the potential for sustained coupled Fe(III) oxide and U(VI) reduction in experimental flow-through reactor systems (i.e. sediment columns and ''semicontinuous culture'' systems) that are conceptually analogous to hydrologically-open subsurface environments. The results conclusively demonstrated the potential for sustained removal of U(VI) from solution via DMRB activity in excess of the U(VI) sorption capacity of the natural mineral assemblages as determined in abiotic controls. In addition, the abundance of sorbed U(VI) (a potential long-term source of U(VI) to the aqueous phase) was much lower in the biotic vs. abiotic systems. The latter results agree with other project findings which demonstrated the capacity for G. sulfurreducens to reduce sorbed U(VI). Throughout the project we have developed and refined a variety of reaction-based models of coupled Fe(III) oxide/U(VI) reduction, including a generalized model which accounts for the population dynamics of various respiratory microbial functional groups. These models have been employed in numerical simulations of both batch bench

  2. Final focus system for high intensity beams

    SciTech Connect

    Henestroza, E.; Bieniosek, F.M.; Eylon, S.; Roy, P.K.; Yu, S.S.

    2003-05-01

    The NTX experiment at the Heavy Ion Fusion Virtual National Laboratory is exploring the performance of neutralized final focus systems for high perveance heavy ion beams. The NTX final focus system produces a converging beam at the entrance to the neutralized drift section where it focuses to a small spot. The final focus lattice consists of four pulsed quadrupole magnets. The main issues are the control of emittance growth due to high order fields from magnetic multipoles and image fields. We will present experimental results from NTX on beam envelope and phase space distributions, and compare these results with particle simulations using the particle-in-cell code WARP.

  3. 45 CFR 150.219 - Final determination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Are Failing To Substantially Enforce HIPAA Requirements § 150.219 Final determination. If, after...) Identification of the HIPAA requirements that CMS is enforcing. (b) The effective date of CMS's enforcement....

  4. 45 CFR 150.219 - Final determination.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Are Failing To Substantially Enforce HIPAA Requirements § 150.219 Final determination. If, after...) Identification of the HIPAA requirements that CMS is enforcing. (b) The effective date of CMS's enforcement....

  5. 45 CFR 150.219 - Final determination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Are Failing To Substantially Enforce HIPAA Requirements § 150.219 Final determination. If, after...) Identification of the HIPAA requirements that CMS is enforcing. (b) The effective date of CMS's enforcement....

  6. Research in High Energy Physics. Final report

    SciTech Connect

    Conway, John S.

    2013-08-09

    This final report details the work done from January 2010 until April 2013 in the area of experimental and theoretical high energy particle physics and cosmology at the University of California, Davis.

  7. 10 CFR 820.67 - Final order.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a Secretarial Officer. If filing is made under § 820.66, an exemption decision becomes a Final Order 45 days after it is filed by a Secretarial Officer, unless the Secretary stays the effective date...

  8. 10 CFR 820.67 - Final order.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a Secretarial Officer. If filing is made under § 820.66, an exemption decision becomes a Final Order 45 days after it is filed by a Secretarial Officer, unless the Secretary stays the effective date...

  9. 10 CFR 820.67 - Final order.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... a Secretarial Officer. If filing is made under § 820.66, an exemption decision becomes a Final Order 45 days after it is filed by a Secretarial Officer, unless the Secretary stays the effective date...

  10. 10 CFR 820.67 - Final order.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a Secretarial Officer. If filing is made under § 820.66, an exemption decision becomes a Final Order 45 days after it is filed by a Secretarial Officer, unless the Secretary stays the effective date...

  11. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  12. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  13. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  14. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  15. Final report, Feedback limitations of photosynthesis

    SciTech Connect

    Sharkey, Thomas D.

    1999-07-22

    Final report of research on carbon metabolism of photosynthesis. The feedback from carbon metabolism to primary photosynthetic processes is summarized, and a comprehensive list of published scientific papers is provided.

  16. A Lifeline Home: Goddard's Final Shuttle Mission

    NASA Video Gallery

    Controllers at Goddard's Network Integration Center share their thoughts as the 30-year-old Shuttle Program comes to an end with the final flight of STS-135, which concluded with a textbook landing...

  17. IRIS Toxicological Review of Hexachloroethane (2011 Final)

    EPA Science Inventory

    EPA is announcing the release of the final report Toxicological Review of Hexachloroethane: in support of the Integrated Risk Information System (IRIS). The updated Summary for Acrylamide and accompanying Quickview have also been added to the IRIS database.

  18. Mixing processes following the final stratospheric warming

    NASA Technical Reports Server (NTRS)

    Hess, Peter G.

    1991-01-01

    An investigation is made of the dynamics responsible for the mixing and dissolution of the polar vortex during the final stratospheric warmings. The dynamics and transport during a Northern Hemisphere final stratospheric warming are simulated via a GCM and an associated offline N2O transport model. The results are compared with those obtained from LIMS data for the final warming of 1979, with emphasis on the potential vorticity evolution in the two datasets, the modeled N2O evolution, and the observed O3 evolution. Following each warming, the remnants of the originally intact vortex are found to gradually homogenize with the atmosphere at large. Two processes leading to this homogenization are identified following the final warmings, namely, the potential vorticity field becomes decorrelated from that of the chemical tracer, and the vortex remnants begin to tilt dramatically in a vertical direction.

  19. Data Network Weather Service Reporting - Final Report

    SciTech Connect

    Michael Frey

    2012-08-30

    A final report is made of a three-year effort to develop a new forecasting paradigm for computer network performance. This effort was made in co-ordination with Fermi Lab's construction of e-Weather Center.

  20. Expedition 36 Final Exams and Training

    NASA Video Gallery

    The Expedition 36 crew members conduct final training at the Gagarin Cosmonaut Training Center before their May 28 launch to the International Space Station. Flight Engineers Karen Nyberg, Fyodor Y...

  1. Expedition 35/36 Final Exams

    NASA Video Gallery

    Three Expedition 35/36 crew members prepare for their final exams in their Sokol launch and entry suits at the Gagarin Cosmonaut Training Center in Star City, Russia. NASA astronaut Chris Cassidy a...

  2. Expedition 32 Final Soyuz Qualification Exams

    NASA Video Gallery

    Expedition 32 Flight Engineers Suni Williams, Yuri Malenchenko and Aki Hoshide take their final Soyuz systems qualification exams at the Gagarin Cosmonaut Training Center in Star City, Russia. The ...

  3. Moonshot Panel Moving Toward Final Report

    Cancer.gov

    An NCI Cancer Currents blog from acting NCI Director Dr. Doug Lowy providing an update on the activities of the National Cancer Moonshot Initiative’s Blue Ribbon Panel and its work to develop a final report.

  4. Astronauts Train for Final Shuttle Mission

    NASA Video Gallery

    The crew of STS-135, the final space shuttle mission, rehearsed their launch day process at NASA's Kennedy Space Center in Florida during a Terminal Countdown Demonstration Test that took place Jun...

  5. Cross-coupling: The final frontier

    NASA Astrophysics Data System (ADS)

    Glasspoole, Ben W.; Crudden, Cathleen M.

    2011-12-01

    Cross-coupling between a racemic secondary alkyl halide and an alkyl borane to produce an enantioenriched alkyl-alkyl product is one of the final substrate combinations to succumb to the synthetically powerful Suzuki-Miyaura methodology.

  6. Norcal Prototype LNG Truck Fleet: Final Results

    SciTech Connect

    Not Available

    2004-07-01

    U.S. DOE and National Renewable Energy Laboratory evaluated Norcal Waste Systems liquefied natural gas (LNG) waste transfer trucks. Trucks had prototype Cummins Westport ISXG engines. Report gives final evaluation results.

  7. Final disposal room structural response calculations

    SciTech Connect

    Stone, C.M.

    1997-08-01

    Finite element calculations have been performed to determine the structural response of waste-filled disposal rooms at the WIPP for a period of 10,000 years after emplacement of the waste. The calculations were performed to generate the porosity surface data for the final set of compliance calculations. The most recent reference data for the stratigraphy, waste characterization, gas generation potential, and nonlinear material response have been brought together for this final set of calculations.

  8. Results from the final focus test beam

    SciTech Connect

    Burke, D.L.; Final Focus Test Beam Collaboration

    1994-07-01

    first experimental results from the Final Focus Test Beam (FFTB) are given in this report. The FFTB has been constructed as a prototype for the final focus system of a future TeV-scale electron-positron linear collider. The vertical dimension of the 47 GeV electron beam form the SLAC linac has been reduced at the focal point of the FFTB by a demagnification of 320 to a beam height of approximately 70 nanometers.

  9. Final HIPAA security regulations: a review.

    PubMed

    Garner, John C

    2003-01-01

    This article examines the national standards for safeguarding the confidentiality, integrity, and availability of electronic protected health information under the final Privacy Rule of the Health Insurance Portability and Accountability Act (HIPAA). The standards require entities covered by the rule to implement basic safeguards to protect electronic protected health information from unauthorized access, alteration, deletion, and transmission. The final privacy rule applies to protected health information in any form. PMID:14983648

  10. The final focus test beam project

    SciTech Connect

    Burke, D.

    1991-05-01

    An overview is given of the Final Focus Test Beam (FFTB) that is being constructed as a prototype final focus system for a future electron-positron linear collider. This beam line will use as input the 50 GeV electron beam from the SLC linac, and is designed to reduce the transverse dimensions of the beam spot at the focal point to 1 {mu}m. 5 refs., 2 figs., 1 tab.

  11. Final year medical education in Germany.

    PubMed

    Nikendei, Christoph; Krautter, Markus; Celebi, Nora; Obertacke, Udo; Jünger, Jana

    2012-01-01

    Medical education in Germany has undergone significant changes. The current article attempts to give an overview of final year medical education in Germany and implications for further developments. Challenges in final year medical education mainly arise from the lack of clearly defined learning objectives, the provision of structure, independent patient management and professional guidance and supervision. The abolition of the one-and-a-half-year period of pre-registration medical training in 2004 and the changes in the structure of state examinations in line with the amendment of medical licensing regulations in 2002, meant pressure on the efficiency of final year medical education on the one hand, and additional burden on final year students on the other. In this article, a broad variety of innovative models that have been implemented at different medical faculties, and which address final year students' needs, will be reported. Further challenges, such as the integration of general medicine rotations, the abolishment of the second state examination in its present form, and the integration of final year students' individual career plans will be discussed. PMID:22480889

  12. The hazardous waste management system--Environmental Protection Agency. Interim final amendments to interim final and final rules.

    PubMed

    1982-06-24

    The Resource Conservation and Recovery Act (RCRA) requires that EPA set regulatory standards for all facilities which treat, store, or dispose of hazardous waste. In partial implementation of its requirement, on January 23, 1981, EPA set regulatory standards for incinerators that burn hazardous waste. These regulations were issued as "interim final," which means that, although they were issued in final form, the Agency invited public comment on them with a view to future amendment. Today, EPA is amending, on an interim final basis, certain of its regulations applicable to hazardous waste incineration facilities. Today's amendments include revisions to: the general standards for permitting hazardous waste incinerators (Part 264, Subpart O), published in the Federal Register on January 23, 1981; the interim status standards for hazardous waste incinerators (Part 265, Subpart O), revised on January 23, 1981; and the consolidated permit requirements for incinerators (Part 122), published on May 19, 1980 and January 23, 1981.U PMID:10255871

  13. 33 CFR 1.05-50 - Final rule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Final rule. 1.05-50 Section 1.05... PROVISIONS Rulemaking § 1.05-50 Final rule. In some instances, a final rule may be issued without prior... have been considered, a final rule is issued. A final rule document contains a preamble that...

  14. 33 CFR 1.05-50 - Final rule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Final rule. 1.05-50 Section 1.05... PROVISIONS Rulemaking § 1.05-50 Final rule. In some instances, a final rule may be issued without prior... have been considered, a final rule is issued. A final rule document contains a preamble that...

  15. 33 CFR 1.05-50 - Final rule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Final rule. 1.05-50 Section 1.05... PROVISIONS Rulemaking § 1.05-50 Final rule. In some instances, a final rule may be issued without prior... have been considered, a final rule is issued. A final rule document contains a preamble that...

  16. 33 CFR 1.05-50 - Final rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Final rule. 1.05-50 Section 1.05... PROVISIONS Rulemaking § 1.05-50 Final rule. In some instances, a final rule may be issued without prior... have been considered, a final rule is issued. A final rule document contains a preamble that...

  17. 33 CFR 1.05-50 - Final rule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Final rule. 1.05-50 Section 1.05... PROVISIONS Rulemaking § 1.05-50 Final rule. In some instances, a final rule may be issued without prior... have been considered, a final rule is issued. A final rule document contains a preamble that...

  18. Alfred Russel Wallace's world of final causes.

    PubMed

    Smith, Charles H

    2013-12-01

    Alfred Russel Wallace (1823-1913) is an important figure in the history of science, but there remain many questions about the nature of his world view, and how it developed. Here, Wallace's appreciation of the role of final causes in evolution is linked to some of its probable origins, with an emphasis on the influence of Alexander von Humboldt (1769-1859). The question is then asked whether a final causes-based scientific agenda might be possible, and answered by drawing attention to two current efforts in that direction by Adrian Bejan, and by the author. A sketch of the latter approach, adapted from Spinozian thinking, is given, with an empirical example involving drainage basin morphology that suggests structural influences of a final causes sort. PMID:24019011

  19. Comprehensive Child Welfare Information System. Final rule.

    PubMed

    2016-06-01

    This final rule replaces the Statewide and Tribal Automated Child Welfare Information Systems (S/TACWIS) rule with the Comprehensive Child Welfare Information System (CCWIS) rule. The rule also makes conforming amendments in rules in related requirements. This rule will assist title IV-E agencies in developing information management systems that leverage new innovations and technology in order to better serve children and families. More specifically, this final rule supports the use of cost-effective, innovative technologies to automate the collection of high-quality case management data and to promote its analysis, distribution, and use by workers, supervisors, administrators, researchers, and policy makers. PMID:27295732

  20. Use of Symbols in Labeling. Final rule.

    PubMed

    2016-06-15

    The Food and Drug Administration (FDA or the Agency) is issuing this final rule revising its medical device and certain biological product labeling regulations to explicitly allow for the optional inclusion of graphical representations of information, or symbols, in labeling (including labels) without adjacent explanatory text (referred to in this document as "stand-alone symbols") if certain requirements are met. The final rule also specifies that the use of symbols, accompanied by adjacent explanatory text continues to be permitted. FDA is also revising its prescription device labeling regulations to allow the use of the symbol statement "Rx only" or "[rx] only" in the labeling for prescription devices. PMID:27311137

  1. Optimization of the NLC final focus system

    SciTech Connect

    Zimmermann, F.; Helm, R.; Irwin, J.

    1995-06-01

    An optimization scheme for final focus systems is discussed and applied to the NLC design. The optical functions at the defocusing sextupoles, the sextupole strength, and the length of the system must obey eight conditions that are imposed by the spot size increase due to higher-order aberrations, the effects of synchrotron radiation in the bending magnets, power supply ripple, magnet vibration tolerances, and the estimated orbit stability at the sextupoles. These eight conditions determine the minimum optimum length of the system. The NLC final focus design was shortened to this optimum.

  2. Palliative care - what the final days are like

    MedlinePlus

    End of life - final days; Hospice - final days ... serious illnesses or who are in the final days of life. ... do symptoms change for patients in the last days and hours of life? In: Goldstein NE, Morrison ...

  3. 77 FR 14416 - Notice of Availability of a Final Environmental Impact Statement and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) has prepared a Proposed California Desert Conservation Area (CDCA) Plan Amendment (PA)/Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) for the Ocotillo Express......

  4. Skin protectant drug products for over-the-counter human use; final monograph. Final rule.

    PubMed

    2003-06-01

    The Food and Drug Administration (FDA) is issuing a final rule in the form of a final monograph establishing conditions under which over-the-counter (OTC) skin protectant drug products are generally recognized as safe and effective and not misbranded as part of the ongoing review of OTC drug products conducted by FDA. The final monograph includes OTC skin protectant drug products for minor cuts, scrapes, burns, chapped skin and lips, poison ivy, poison oak, poison sumac, and insect bites. FDA is issuing this final rule after considering public comments on the agency's proposed regulation, which was issued in the form of a tentative final monograph, and all new data and information on skin protectant drug products for these specific uses that have come to the agency's attention. This final rule amends the regulation that lists nonmonograph active ingredients by adding those OTC skin protectant ingredients that have been found to be not generally recognized as safe and effective. This final rule also lifts the stay of 21 CFR part 352 (published at 66 FR 67485, December 31, 2001) to amend the final monograph for OTC sunscreen drug products to include sunscreen-skin protectant combination drug products, and then stays Sec. 347.20(d) (21 CFR 347.20(d)) and part 352 until further notice in the Federal Register. PMID:12785379

  5. 78 FR 43912 - Final Candidate Conservation Agreement with Assurances, Final Environmental Assessment, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ...We, the U.S. Fish and Wildlife Service (Service), make available the final Candidate Conservation Agreement with Assurances (CCAA) for the Rio Grande cutthroat trout (Oncorhynchus clarki virginialis) in New Mexico and Colorado, as well as the final environmental assessment (EA) and the draft Finding of No Significant Impact (FONSI) under the National Environmental Policy Act of 1969 (NEPA).......

  6. Medicare Program; Final Waivers in Connection With the Shared Savings Program. Final rule.

    PubMed

    2015-10-29

    This final rule finalizes waivers of the application of the physician self-referral law, the Federal anti-kickback statute, and the civil monetary penalties (CMP) law provision relating to beneficiary inducements to specified arrangements involving accountable care organizations (ACOs) under section 1899 of the Social Security Act (the Act) (the "Shared Savings Program''), as set forth in the Interim Final Rule with comment period (IFC) dated November 2, 2011. As explained in greater detail below, in light of legislative changes that occurred after publication of the IFC, this final rule does not finalize waivers of the application of the CMP law provision relating to "gainsharing'' arrangements. Section 1899(f) of the Act, as added by the Affordable Care Act, authorizes the Secretary to waive certain fraud and abuse laws as necessary to carry out the provisions of section 1899 of the Act. PMID:26524770

  7. 21 CFR 26.81 - Final provisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Final provisions. 26.81 Section 26.81 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL MUTUAL RECOGNITION OF PHARMACEUTICAL GOOD MANUFACTURING PRACTICE REPORTS, MEDICAL DEVICE QUALITY SYSTEM AUDIT...

  8. 21 CFR 26.81 - Final provisions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Final provisions. 26.81 Section 26.81 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL MUTUAL RECOGNITION OF PHARMACEUTICAL GOOD MANUFACTURING PRACTICE REPORTS, MEDICAL DEVICE QUALITY SYSTEM AUDIT...

  9. Photon final states at the Tevatron

    SciTech Connect

    Campanelli, Mario; /University Coll. London

    2008-04-01

    The authors present here several recent measurements involving associate production of photons and jets at the Tevatron. In particular, inclusive photon + met from D0, and photon + b-jets and photon + b-jet + leptons + MET from CDF are described in some detail. These measurements offer a good test of QCD predictions in rather complex final states.

  10. Michigan Early Adolescent Survey: Final Report.

    ERIC Educational Resources Information Center

    Keith, Joanne; And Others

    This document contains the final report from the Michigan Early Adolescent Survey, a study undertaken to: (1) develop a profile of Michigan early adolescents that focused on out-of-school time and included biological, psychological, and sociological information; (2) develop a profile of families which included early adolescents; (3) assess the…

  11. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  12. California Prison Gang Project. Final Report.

    ERIC Educational Resources Information Center

    Cummins, Eric

    A project investigated the cultural life, ideology, and education systems of particular prison gangs. It focused on recent changes in the gang system regarding gang education, organizational structure, and the balance of power in prisons and in relations with street gangs. Finally, the project assessed California's response to its prison gangs, in…

  13. Final/Progress Report for Instrumentation Grant

    SciTech Connect

    1997-03-31

    The major piece of equipment was a Furnace Model 1000 used during the Nitrate to Ammonia and Ceramic (NAC) process to sinter the ceramic final product. NAC is a new technology to immobilize liquid radioactive waste simulants. The grant also funded related control and measuring equipment.

  14. 78 FR 27 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  15. 49 CFR 7.32 - Final determinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Final determinations. 7.32 Section 7.32 Transportation Office of the Secretary of Transportation PUBLIC AVAILABILITY OF INFORMATION Time Limits § 7.32... life or physical safety of an individual; (ii) A request made by a person primarily engaged...

  16. 50 CFR 296.11 - Final determination.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 11 2013-10-01 2013-10-01 false Final determination. 296.11 Section 296.11 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE CONTINENTAL SHELF FISHERMEN'S CONTINGENCY FUND § 296.11...

  17. Linguistics in the Undergraduate Curriculum: Final Report.

    ERIC Educational Resources Information Center

    Langendoen, D. Terence, Ed.

    A study examines the place of linguistics in undergraduate curricula in the United States and Canada, the nature and structure of the curriculum leading to a bachelor's degree in linguistics, and the population served by the curriculum. The final report consists of an overview of the study, including the forms used for the survey; a directory of…

  18. Reentry Programs for Female Scientists. Final Report.

    ERIC Educational Resources Information Center

    Lantz, Alma E.; And Others

    This is the final report of research oriented to determine the problems and successes associated with women scientists who reenter the labor force. The report deals with the assessment of the strategies used in the National Science Foundation (NSF) Career Facilitation Projects for reentry women. The evaluation focuses on the successful approaches…

  19. 75 FR 19895 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2.... At the confluence with +475 Marble Creek. * National Geodetic Vertical Datum. + North...

  20. 78 FR 45938 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... flood hazard information for each community is available for inspection at the respective Community Map... community or online through the FEMA Map Service Center at www.msc.fema.gov . The flood hazard... SECURITY Federal Emergency Management Agency Final Flood Hazard Determinations AGENCY: Federal...

  1. Massachusetts Regional Alignment Workshops: Final Report

    ERIC Educational Resources Information Center

    Conley, David T.; McGaughy, Charis; Ward, Terri; Martinez, Mary

    2008-01-01

    In April 2008, the Massachusetts Department of Elementary and Secondary Education (DESE) contracted with the Educational Policy Improvement Center (EPIC) to facilitate a series of regional workshops and provide technical assistance to strengthen efforts to improve college readiness for all students. This final report summarizes these activities…

  2. 42 CFR 417.810 - Final settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Health Care Prepayment Plans § 417.810 Final settlement. (a) General requirement. CMS and an HCPP... receiving health care services on a fee-for-service or other basis; and (iii) Information on enrollment...

  3. 42 CFR 417.576 - Final settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Final settlement. 417.576 Section 417.576 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE...

  4. 42 CFR 417.810 - Final settlement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Health Care Prepayment Plans § 417.810 Final settlement. (a) General requirement. CMS and an HCPP... receiving health care services on a fee-for-service or other basis; and (iii) Information on enrollment...

  5. CLEOPATRA holds strong in final analysis.

    PubMed

    2014-12-01

    According to the final analysis of CLEOPATRA, first-line treatment with pertuzumab plus trastuzumab and docetaxel significantly improves overall survival for patients with HER2-positive metastatic breast cancer. As such, dual HER2 blockade plus chemotherapy should be the standard of care in this setting, researchers say. PMID:25477120

  6. 76 FR 3531 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  7. 76 FR 54134 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  8. 75 FR 78926 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  9. CEI Final Report: Appendices: Vol. II.

    ERIC Educational Resources Information Center

    Central Susquehanna Intermediate Unit 16, Lewisburg, PA.

    The second volume of the final report on a regional inservice training institute in career education for teams of selected Pennsylvania educators, the document is a collection of 14 appendixes to the actual report of the organization and proceedings of the institute, which was held in three one-week sessions at four-week intervals. The appendixes…

  10. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  11. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  12. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  13. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  14. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  15. 78 FR 46309 - Rules of Administrative Finality

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ... From the Federal Register Online via the Government Publishing Office SOCIAL SECURITY ADMINISTRATION 20 CFR Parts 404 and 416 Rules of Administrative Finality AGENCY: Social Security Administration.... We strongly urge you not to include in your comments any personal information, such as...

  16. IRIS Toxicological Review of Trimethylbenzenes (Final Report)

    EPA Science Inventory

    The U.S. Environmental Protection Agency (USEPA) has finalized the Integrated Risk Information System (IRIS) Assessment of Trimethylbenzenes (TMBs). This assessment addresses the potential non-cancer and cancer human health effects from long-term exposure to TMBs. Now fi...

  17. IRIS Toxicological Review of Chloroprene (2010 Final)

    EPA Science Inventory

    The final Toxicological Review of Chloroprene provides scientific support and rationale for the hazard and dose-response assessment pertaining to chronic exposure to chloroprene. Chloroprene (C4H5Cl) is a volatile, flammable liquid used primarily in the manufacture of poly...

  18. Modeling of GE Appliances: Final Presentation

    SciTech Connect

    Fuller, Jason C.; Vyakaranam, Bharat; Leistritz, Sean M.; Parker, Graham B.

    2013-01-31

    This report is the final in a series of three reports funded by U.S. Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) in collaboration with GE Appliances’ through a Cooperative Research and Development Agreement (CRADA) to describe the potential of GE Appliances’ DR-enabled appliances to provide benefits to the utility grid.

  19. IRIS Toxicological Review of Naphthalene (1998 Final)

    EPA Science Inventory

    EPA is announcing the release of the final report, Toxicological Review of Naphthalene: in support of the Integrated Risk Information System (IRIS). The updated Summary for Naphthalene and accompanying Quickview have also been added to the IRIS Database.

  20. Learning during a Collaborative Final Exam

    ERIC Educational Resources Information Center

    Dahlstrom, Orjan

    2012-01-01

    Collaborative testing has been suggested to serve as a good learning activity, for example, compared to individual testing. The aim of the present study was to measure learning at different levels of knowledge during a collaborative final exam in a course in basic methods and statistical procedures. Results on pre- and post-tests taken…

  1. Final Report Computational Analysis of Dynamical Systems

    SciTech Connect

    Guckenheimer, John

    2012-05-08

    This is the final report for DOE Grant DE-FG02-93ER25164, initiated in 1993. This grant supported research of John Guckenheimer on computational analysis of dynamical systems. During that period, seventeen individuals received PhD degrees under the supervision of Guckenheimer and over fifty publications related to the grant were produced. This document contains copies of these publications.

  2. 75 FR 3171 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... upstream of County Highway E. Flambeau River At the confluence with +1054 Unincorporated Areas of...

  3. 78 FR 21273 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order 13132... et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  4. 78 FR 21272 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order 13132... et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  5. Final Four Offers NCAA Respite from Criticism

    ERIC Educational Resources Information Center

    Sander, Libby

    2009-01-01

    When it's not staging any Final Four match-ups, the National Collegiate Athletic Association (NCAA) is the powerful governing body critics love to hate. The association's 11-year, $6-billion contract with CBS to televise the tournament has become a lightning rod for critics who say the association is all about making money off athletes. Not so,…

  6. Model Tech Prep Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Southern Maryland Educational Consortium, La Plata.

    The Southern Maryland Educational Consortium's Tech Prep Model Demonstration project is described in this final report. The consortium members are Calvert, Charles, and St. Mary's county school districts and Charles County Community College in southern Maryland. The project is based on a 4 + 2 model in which ninth-grade students develop career…

  7. 19 CFR 351.210 - Final determination.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Final determination. 351.210 Section 351.210 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING... determination, if: (i) In a situation where the Secretary simultaneously initiated antidumping...

  8. 19 CFR 351.210 - Final determination.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Final determination. 351.210 Section 351.210 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING... determination, if: (i) In a situation where the Secretary simultaneously initiated antidumping...

  9. 19 CFR 351.210 - Final determination.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Final determination. 351.210 Section 351.210 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING... determination, if: (i) In a situation where the Secretary simultaneously initiated antidumping...

  10. 19 CFR 351.210 - Final determination.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Final determination. 351.210 Section 351.210 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING... determination, if: (i) In a situation where the Secretary simultaneously initiated antidumping...

  11. Javanese-English Dictionary Project. Final Report.

    ERIC Educational Resources Information Center

    Horne, Elinor Clark

    The purpose of the research covered by this final report was to produce a Javanese-English dictionary, the first ever to exist. Source materials were of two major kinds: (1) pre-Revolution sources: the two most recetnly published Javanese dictionaries (see Bibliography, Pigeaud and Poerwadarminta), predating the 1945 Indonesian war for…

  12. Physics modeling support contract: Final report

    SciTech Connect

    Not Available

    1987-09-30

    This document is the final report for the Physics Modeling Support contract between TRW, Inc. and the Lawrence Livermore National Laboratory for fiscal year 1987. It consists of following projects: TIBER physics modeling and systems code development; advanced blanket modeling task; time dependent modeling; and free electron maser for TIBER II.

  13. IRIS TOXICOLOGICAL REVIEW OF ACROLEIN (2003 Final)

    EPA Science Inventory

    EPA is announcing the release of the final report, Toxicological Review of Acrolein: in support of the Integrated Risk Information System (IRIS). The updated Summary for Acrolein and accompanying Quickview have also been added to the IRIS Database.

  14. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... registration or the insistence upon a requirement may be stated to be final, whereupon applicant's response is... for filing a response to an outstanding Office action, appeal to the Trademark Trial and Appeal Board... amendment to allege use under § 2.76, the applicant is found not entitled to registration for any reason...

  15. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... registration or the insistence upon a requirement may be stated to be final, whereupon applicant's response is... for filing a response to an outstanding Office action, appeal to the Trademark Trial and Appeal Board... amendment to allege use under § 2.76, the applicant is found not entitled to registration for any reason...

  16. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... registration or the insistence upon a requirement may be stated to be final, whereupon applicant's response is... for filing a response to an outstanding Office action, appeal to the Trademark Trial and Appeal Board... amendment to allege use under § 2.76, the applicant is found not entitled to registration for any reason...

  17. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... registration or the insistence upon a requirement may be stated to be final, whereupon applicant's response is... for filing a response to an outstanding Office action, appeal to the Trademark Trial and Appeal Board... amendment to allege use under § 2.76, the applicant is found not entitled to registration for any reason...

  18. Task Force on Homosexuality. Final Report.

    ERIC Educational Resources Information Center

    National Inst. of Mental Health (DHEW), Rockville, MD.

    This final Task Force report recommends the coordination of NIMH activities in the broad area of sexual behavior through the establishment of a Center for the Study of Sexual Behavior. The activities proposed for the Center fall into two major areas: research, training and education, prevention, and treatment; and questions of social policy with…

  19. 76 FR 39305 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  20. Project "Flashlight" Planning Grant. Final Report.

    ERIC Educational Resources Information Center

    Ehrmann, Stephen C.

    This final report describes results of a planning grant for the "Flashlight" project, an effort to develop, test, and disseminate evaluation procedures that a postsecondary institution or department could use to periodically assess its evolving educational strategies, in particular strategies supported by use of computing, video, and…

  1. Final state interactions and inclusive nuclear collisions

    NASA Technical Reports Server (NTRS)

    Cucinotta, Francis A.; Dubey, Rajendra R.

    1993-01-01

    A scattering formalism is developed in a multiple scattering model to describe inclusive momentum distributions for high-energy projectiles. The effects of final state interactions on response functions and momentum distributions are investigated. Calculations for high-energy protons that include shell model response functions are compared with experiments.

  2. Transitional Employment Experimental Model (TEEM). Final Report.

    ERIC Educational Resources Information Center

    California State Personnel Board, Sacramento.

    The final report of the Transitional Employemnt Experimental Model (TEEM) Project, a research and development project providing a potential model for a large scale manpower absorption program in times of economic need, is presented. One major purpose of the project was to demonstrate the viability of providing suitable job placement for the…

  3. Group Errorless Teaching Strategies (GETS). Final Report.

    ERIC Educational Resources Information Center

    Gast, David L.; Wolery, Mark

    This final report of the Group Errorless Teaching Strategies Research Project is organized by the project objectives and covers planned and actual activities and outcomes. Objective 1 involved a review of the literature related to teaching students with mild and moderate mental handicaps in group settings and resulted in three articles which…

  4. 31 CFR 223.20 - Final decisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Final decisions. 223.20 Section 223.20 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE SURETY COMPANIES DOING BUSINESS WITH THE...

  5. Waste Management Technician Partnership Program. Final Report.

    ERIC Educational Resources Information Center

    Campbell, Donna

    This final report for Columbia Basin College's waste management technician partnership program outlines 4 objectives: (1) develop at least 4 waste management competency-based curriculum modules; (2) have 50 participants complete at least 1 module; (3) have 100 participants complete a training and/or certification program and 200 managers complete…

  6. Final design report for cone penetrometer platform

    SciTech Connect

    Seda, R.Y., Westinghouse Hanford

    1996-08-13

    The final design report documents the completion of the design review meetings for acceptance of the cone penetrometer from the vendor. All design comments have been dispositioned and closed. Open items dealt with completion of the safety assessment,operational procedures, operational testing and readiness review.

  7. Inclusion through Transdisciplinary Teaming (ITT). Final Report.

    ERIC Educational Resources Information Center

    Olson, Jennifer; And Others

    This final report describes the Inclusion through Transdisciplinary Teaming (ITT) project, which provided support to personnel working in schools, child care centers, and Head Start programs as they designed and provided services that included young children with disabilities and their families. During its 3 years of outreach, ITT project staff…

  8. 75 FR 11468 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  9. IRIS Toxicological Review of Pentachlorophenol (2010 Final)

    EPA Science Inventory

    The final Toxicological Review of Pentachlorophenol provides scientific support and rationale for the hazard and dose-response assessment pertaining to chronic exposure to pentachlorophenol. Pentachlorophenol is a wood preservative used to prevent decay from fungal organ...

  10. Final Technical Report CMS fast optical calorimetry

    SciTech Connect

    Winn, David R.

    2012-07-12

    This is the final report of CMS FAST OPTICAL CALORIMETRY, a grant to Fairfield University for development, construction, installation and operation of the forward calorimeter on CMS, and for upgrades of the forward and endcap calorimeters for higher luminosity and radiation damage amelioration.

  11. 77 FR 71702 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  12. Building Communities for Learning. Final Report.

    ERIC Educational Resources Information Center

    Sherow, Sheila M.

    This document includes a final report, guidelines for mentoring communities, and a guidebook for community-based planning developed by the Building Communities for Learning (BCL) project conducted to encourage Pennsylvania communities to develop community-based planning groups to improve the delivery of services for adult learners and maximize…

  13. Physics of Extra Dimensions Final Report

    SciTech Connect

    Csaba Csaki

    2007-12-19

    We provide the final report for Csaba Csaki's OJI project on "Physics of extra dimensions". It includes the summary of results of higgsless electroweak symmetry breaking, gauge-higgs unification, AdS/QCD and holographic technicolor, and chiral lattice theories from warped extra dimensions.

  14. Final J-2X Test of 2011

    NASA Video Gallery

    NASA conducted its final J-2X rocket engine test of the year Dec. 14, the 10th firing in a series of tests on the new upper-stage engine that will carry humans farther into space than ever before. ...

  15. Dropout Prevention Counseling Program: Final Report.

    ERIC Educational Resources Information Center

    Bush, Marilyn G.

    This document presents the final report of a dropout prevention counseling program designed for elementary school students in McDowell County, West Virginia. The purpose of the program is explained and three objectives met by the project are identified: (1) counseling sessions were held with each of the identified potential dropouts (N=206) in two…

  16. 76 FR 61279 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations Correction In rule document 2011-15507, beginning on page 36373, in the issue of Wednesday June 22, 2011,...

  17. Clark County Vocational Skills Center. Final Report.

    ERIC Educational Resources Information Center

    Bjur, Michael P.

    This volume comprises the final report of a project to develop curricula for eight vocational and technical occupations as well as copies of the curricula themselves. The individual curricula address the following occupational areas: automotive repair, computer technology, dental assisting, diesel and heavy equipment mechanics, electronics, food…

  18. Multiple Output Sensory Trainer (MOST). Final Report.

    ERIC Educational Resources Information Center

    Automated Functions, Inc., Arlington, VA.

    This final report describes the design, development, and testing of the Multiple Output Sensory Trainer (MOST), a computer-based system which enables the evaluation of students with visual impairments to determine the optimal combination of sensory adaptive aids to meet their needs. The system uses multimedia devices in conjunction with customized…

  19. 15 CFR 908.6 - Final report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.6 Final report. Upon completion of a weather... activity on which weather modification activities were conducted, segregated by each of the major purposes of the activities. (d) The total number of hours of operation of each type of weather...

  20. Science and Math Applications. Final Report.

    ERIC Educational Resources Information Center

    Lauver, Lori A.

    This document includes a final report and curriculum guide from a project to develop a Science and Math Applications curriculum that related science and math to everyday life and promoted confidence in adult basic education students in their science and math skills. The report describes how the curriculum used traditional teaching methods to teach…

  1. 78 FR 6743 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order 13132... et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  2. 77 FR 6980 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... Executive Order 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order....C. 4001 et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  3. 78 FR 5738 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order 13132... et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  4. 75 FR 59095 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Executive Order 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order....C. 4001 et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  5. 77 FR 74610 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ... 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order 13132... et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  6. 78 FR 33991 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order 13132... et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR... SECURITY Federal Emergency Management Agency 44 CFR Part 67 Final Flood Elevation Determinations...

  7. 75 FR 22699 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... County, Nebraska, and Incorporated Areas Docket No.: FEMA-B-7759 Hell Creek Approximately 50 feet...

  8. Pregnant Adolescent Substance Abuse Project. Final Report.

    ERIC Educational Resources Information Center

    McKnight, A. James

    This document is the final report on the Pregnant Adolescent Substance Abuse Project (PASAP) conducted in Prince Georges County (Maryland) in 1987 and 1988. The PASAP consisted of two components that operated independently: an Early Intervention Program that increased the proportion of pregnant adolescent substance users who were using various…

  9. 43 CFR 2521.6 - Final proof.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Procedures § 2521.6 Final proof..., and when the requirements of the desert-land laws as to water rights and the construction of the... the States in which the desert land acts are operative that actual application to a beneficial use...

  10. 43 CFR 2521.6 - Final proof.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Procedures § 2521.6 Final proof..., and when the requirements of the desert-land laws as to water rights and the construction of the... the States in which the desert land acts are operative that actual application to a beneficial use...

  11. 43 CFR 2521.6 - Final proof.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Procedures § 2521.6 Final proof..., and when the requirements of the desert-land laws as to water rights and the construction of the... the States in which the desert land acts are operative that actual application to a beneficial use...

  12. 43 CFR 2521.6 - Final proof.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Procedures § 2521.6 Final proof..., and when the requirements of the desert-land laws as to water rights and the construction of the... the States in which the desert land acts are operative that actual application to a beneficial use...

  13. The Finals Examination in Conservative Dentistry.

    ERIC Educational Resources Information Center

    Jeffrey, I. M. W.; Grieve, A. R.

    1987-01-01

    The format of the final examinations in Conservative Dentistry in the Dental Schools of Great Britain and Ireland was investigated by means of a questionnaire sent to each of the dental schools in each country. Results are reported and the value of different parts of the examinations are discussed. (Author/RH)

  14. 49 CFR 190.241 - Finality.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Finality. 190.241 Section 190.241 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY PIPELINE SAFETY ENFORCEMENT AND REGULATORY PROCEDURES Enforcement Specific...

  15. Job Skills Education Program. Final Technical Report.

    ERIC Educational Resources Information Center

    Florida State Univ., Tallahassee. Center for Educational Technology.

    This publication provides materials developed by a project designed to transfer a U.S. Army computer-based basic skills curriculum to applications in the vocational skills development of civilian adults. An executive summary of the final report describes the Job Skills Education Program (JSEP), which teaches academic skills that support vocational…

  16. 75 FR 8814 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2.... Gridley Creek At the confluence with +1044 Town of Virgil. the Tioughnioga River. Approximately 1.8...

  17. 75 FR 18091 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... inspection at 108 4th Street, Galena, MO 65656 Bee County, Texas, and Incorporated Areas Docket No.:...

  18. 78 FR 10066 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  19. 78 FR 10072 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that..., 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2. The... Jacksonville. Julington Creek. Approximately 2,300 feet +29 upstream of Vineyard Lake Road North. Tacito...

  20. 75 FR 5894 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... and Review, 58 FR 51735. Executive Order 13132, Federalism. This final rule involves no policies that... 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. Sec. 67.11 0 2... Incorporated Areas Docket No.: FEMA-B-1010 Pond Creek At Wilson Dam Highway.... +514 City of Muscle...

  1. IRIS TOXICOLOGICAL REVIEW OF PHOSGENE (2006 Final)

    EPA Science Inventory

    EPA is announcing the release of the final report, Toxicological Review of Phosgene: in support of the Integrated Risk Information System (IRIS). The updated Summary for Phosgene and accompanying Quickview have also been added to the IRIS Database.

  2. 78 FR 48884 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ...Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table......

  3. 15 CFR 908.6 - Final report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Final report. 908.6 Section 908.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS MAINTAINING REC- ORDS AND SUBMITTING REPORTS ON WEATHER...

  4. 5 CFR 1201.126 - Final decisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Final decisions. 1201.126 Section 1201... decisions. (a) In any action to discipline an employee, except as provided in paragraphs (b) or (c) of this... warranted, the administrative law judge, or the Board on petition for review, will issue a written...

  5. First Decade after Graduation. Final Report.

    ERIC Educational Resources Information Center

    Edgar, Eugene

    This final report summarizes findings of the First Decade Project, which examined factors related to the successful transition from school to adult life for youth with disabilities. Subjects were two cohorts of graduates from 1985 and 1990, including all special education graduates (N=488) and randomly selected nondisabled graduates (N=610) from…

  6. 40 CFR 173.8 - Final order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 24 2011-07-01 2011-07-01 false Final order. 173.8 Section 173.8... order. (a) If the State does not request a hearing within the sixty-day time period and the Administrator has not issued an order withdrawing the notice of intent to rescind, the Administrator shall...

  7. 48 CFR 32.605 - Final decisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT FINANCING Contract Debts 32.605 Final decisions. (a) The contracting officer shall issue... to reach agreement on the existence or amount of a debt in a timely manner; (2) The contractor fails to liquidate a debt previously demanded by the contracting officer within the timeline specified...

  8. Technology Assessment Software Package: Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia L.

    This final report describes the Technology Assessment Software Package (TASP) Project, which produced developmentally appropriate technology assessment software for children from 18 months through 8 years of age who have moderate to severe disabilities that interfere with their interaction with people, objects, tasks, and events in their…

  9. 76 FR 29656 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  10. 78 FR 9831 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  11. 77 FR 49379 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  12. 77 FR 26959 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  13. 77 FR 26968 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  14. Field Water Balance of Landfill Final Covers

    EPA Science Inventory

    Landfill covers are critical to waste containment, yet field performance of specific cover designs has not been well documented and seldom been compared in side-by-side testing. A study was conducted to assess the ability of landfill final covers to control percolation into unde...

  15. DCE Bio Detection System Final Report

    SciTech Connect

    Lind, Michael A.; Batishko, Charles R.; Morgen, Gerald P.; Owsley, Stanley L.; Dunham, Glen C.; Warner, Marvin G.; Willett, Jesse A.

    2007-12-01

    The DCE (DNA Capture Element) Bio-Detection System (Biohound) was conceived, designed, built and tested by PNNL under a MIPR for the US Air Force under the technical direction of Dr. Johnathan Kiel and his team at Brooks City Base in San Antonio Texas. The project was directed toward building a measurement device to take advantage of a unique aptamer based assay developed by the Air Force for detecting biological agents. The assay uses narrow band quantum dots fluorophores, high efficiency fluorescence quenchers, magnetic micro-beads beads and selected aptamers to perform high specificity, high sensitivity detection of targeted biological materials in minutes. This final report summarizes and documents the final configuration of the system delivered to the Air Force in December 2008

  16. A Cyber-Astronaut's Final Moves

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This image shows how Deep Impact's impactor targeted comet Tempel 1 as the spacecraft made its final approach in the early morning hours of July 4, Eastern time. The autonomous navigation system on the probe was designed to make as many as three impactor targeting maneuvers, identified as ITMs in this picture, to correct its course to the comet.

    The upper left dot indicates where the probe would have passed the comet's nucleus if no maneuvers were performed. The dot below the nucleus shows where the probe would have flown past the comet if only the first maneuver was made. The leftmost dot on the nucleus marks the spot where the probe would have crunched the comet if only the first two maneuvers had been performed. The lower dot on the nucleus indicates the vicinity where, once the third maneuver was performed, the probe met its final reward and collided with the comet.

  17. 12 CFR 907.13 - Consideration and Final Decisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... by such additional time as may reasonably be required, the Board of Directors shall render a Final... § 907.13 Consideration and Final Decisions. (a) Consideration by Board of Directors. The Board of... described in § 907.14. (b) Final Decision. The Board of Directors shall render a Final Decision on the...

  18. 21 CFR 640.103 - The final product.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false The final product. 640.103 Section 640.103 Food... ADDITIONAL STANDARDS FOR HUMAN BLOOD AND BLOOD PRODUCTS Immune Globulin (Human) § 640.103 The final product. (a) Final solution. The final product shall be a 16.5 ±1.5 percent solution of globulin containing...

  19. TRICARE; extended care health option. Final rule.

    PubMed

    2010-08-01

    The Department of Defense is publishing this final rule to implement the requirements enacted by Congress in Section 732 of the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 which changes the limit of the Government's share of providing certain benefits under the Extended Care Health Option (ECHO) from $2,500 per month to $36,000 per year, and for other non-legislated changes to the ECHO. PMID:20695127

  20. 32 CFR 989.20 - Final EIS.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that it is a final EIS (40 CFR 1503.4(c)), to HQ USAF/A7CI for filing with the EPA (40 CFR 1506.9). If... analysis is required. (b) The EPF processes all necessary supplements to EISs (40 CFR 1502.9) in the same... approval of HQ USAF/A7CI and SAF/IEE, prepare a document containing only comments on the Draft EIS,...

  1. 32 CFR 989.20 - Final EIS.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that it is a final EIS (40 CFR 1503.4(c)), to HQ USAF/A7CI for filing with the EPA (40 CFR 1506.9). If... analysis is required. (b) The EPF processes all necessary supplements to EISs (40 CFR 1502.9) in the same... approval of HQ USAF/A7CI and SAF/IEI, prepare a document containing only comments on the Draft EIS,...

  2. 32 CFR 989.20 - Final EIS.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that it is a final EIS (40 CFR 1503.4(c)), to HQ USAF/A7CI for filing with the EPA (40 CFR 1506.9). If... analysis is required. (b) The EPF processes all necessary supplements to EISs (40 CFR 1502.9) in the same... approval of HQ USAF/A7CI and SAF/IEE, prepare a document containing only comments on the Draft EIS,...

  3. 32 CFR 989.20 - Final EIS.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that it is a final EIS (40 CFR 1503.4(c)), to HQ USAF/A7CI for filing with the EPA (40 CFR 1506.9). If... analysis is required. (b) The EPF processes all necessary supplements to EISs (40 CFR 1502.9) in the same... approval of HQ USAF/A7CI and SAF/IEE, prepare a document containing only comments on the Draft EIS,...

  4. 32 CFR 989.20 - Final EIS.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that it is a final EIS (40 CFR 1503.4(c)), to HQ USAF/A7CI for filing with the EPA (40 CFR 1506.9). If... analysis is required. (b) The EPF processes all necessary supplements to EISs (40 CFR 1502.9) in the same... approval of HQ USAF/A7CI and SAF/IEE, prepare a document containing only comments on the Draft EIS,...

  5. IMP-I spacecraft final magnetic tests

    NASA Technical Reports Server (NTRS)

    Harris, C. A.

    1972-01-01

    The increased IMP-I spacecraft spin axis moment resulting from excessive field exposures during environmental testing substantiated the need for a final pre-launch magnetic deperm and measurement. By performing a dc rotation deperm it was possible to reduce this moment below the previous initial test post deperm magnitude. In addition, the magnetic field disturbance at the flight magnetometer diminished to below 0.1 nanotesla (gamma) in all directions.

  6. Key science legislation awaits final action

    NASA Astrophysics Data System (ADS)

    Jones, Richard M.

    Congress is now in recess and will return to work on September 7, leaving only 4 weeks to complete action on a number of key science funding bills. Fiscal year 1994 begins on October 1.On the “must-do” list for Congress upon its return is Senate consideration and final House and Senate passage of HR2491, the VA, HUD, Independent Agencies Appropriations bill. Both the National Science Foundation and NASA are independent agencies funded under HR2491.

  7. 1995 PVUSA progress report. Final report

    SciTech Connect

    1996-03-01

    Photovoltaics for Utility Scale Applications (PVUSA) is a national public-private partnership that is assessing and demonstrating the viability of utility-scale (US) photovoltaic (PV) electric generation systems and recent developments in PV module technology. This report updates the project`s progress, reviews the status and performance of the various PV installations during 1995, summarizes key accomplishments and conclusions, and serves as the final report under Pacific Gas and Electric Company`s project management.

  8. Heat transfer in oscillatory flow: Final report

    SciTech Connect

    Telionis, D.P.; Diller, T.E.

    1986-11-01

    This is the final report on a 4-year research effort funded by DOE. The bulk of the material has been included in numerous publications which are listed in a later section. Most of these have appeared already in archival journals. The most recent work is included in two Ph.D. dissertations. Since most of the material is already documented in detail in the publications mentioned above, we confine the discussion here to highlights of the results.

  9. Charm nonleptonic decays and final state interactions

    NASA Astrophysics Data System (ADS)

    Buccella, F.; Lusignoli, M.; Pugliese, A.

    1996-02-01

    A global previous analysis of two-body nonleptonic decays of D mesons has been extended to the decays involving light scalar mesons. The allowance for final state interaction also in nonresonant channels provides a fit of much improved quality and with less symmetry breaking in the axial charges. We give predictions for about 50 decay branching ratios yet to be measured. We also discuss long distance contributions to the difference ΔΓ between the DS and DL widths.

  10. Tribal child welfare. Interim final rule.

    PubMed

    2012-01-01

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program. PMID:22242232

  11. Emergency building temperature restrictions. Final evaluation

    SciTech Connect

    1980-11-01

    On July 5, 1979, DOE promulgated final regulations of the Emergency Building Temperature Restrictions program, placing emergency restrictions on thermostat settings for space heating, space cooling, and hot water in commercial, industrial, and nonresidential public buildings. The final regulations restricted space heating to a maximum of 65/sup 0/F, hot water temperature to a maximum of 105/sup 0/F, and cooling temperature to a minimum of 78/sup 0/F. A comprehensive evaluation of the entire EBTF program for a nine-month period from July 16, 1979 is presented. In Chapter 1, an estimate of the population of buildings covered by EBTR is presented. In Chapter 2, EBTR compliance by building type and region is reported. Exemptions are also discussed. In Chapter 3, the simulations of building energy use are explained and the relative impact of various building characteristics and effectiveness of different control strategies are estimated. Finally, in Chapter 4, the methodology for scaling the individual building energy savings to the national level is described, and estimated national energy savings are presented.

  12. Lossless compression of instrumentation data. Final report

    SciTech Connect

    Stearns, S.D.

    1995-11-01

    This is our final report on Sandia National Laboratories Laboratory- Directed Research and Development (LDRD) project 3517.070. Its purpose has been to investigate lossless compression of digital waveform and image data, particularly the types of instrumentation data generated and processed at Sandia Labs. The three-year project period ran from October 1992 through September 1995. This report begins with a descriptive overview of data compression, with and without loss, followed by a summary of the activities on the Sandia project, including research at several universities and the development of waveform compression software. Persons who participated in the project are also listed. The next part of the report contains a general discussion of the principles of lossless compression. Two basic compression stages, decorrelation and entropy coding, are described and discussed. An example of seismic data compression is included. Finally, there is a bibliography of published research. Taken together, the published papers contain the details of most of the work and accomplishments on the project. This final report is primarily an overview, without the technical details and results found in the publications listed in the bibliography.

  13. Cosmological Constant and the Final Anthropic Hypothesis

    NASA Astrophysics Data System (ADS)

    Ćirković, Milan M.; Bostrom, Nick

    The influence of recent detections of a finite vacuum energy (`cosmological constant') on our formulation of anthropic conjectures, particularly the so-called Final Anthropic Principle is investigated. It is shown that non-zero vacuum energy implies the onset of a quasi-exponential expansion of our causally connected domain (`the universe') at some point in the future, a stage similar to the inflationary expansion at the very beginning of time. The transition to this future inflationary phase of cosmological expansion will preclude indefinite survival of intelligent species in our domain, because of the rapid shrinking of particle horizons and subsequent depletion of energy necessary for information processes within the horizon of any observer. Therefore, to satisfy the Final Anthropic Hypothesis (reformulated to apply to the entire ensemble of universes), it is necessary to show that (i) chaotic inflation of Linde (or some similar model) provides a satisfactory description of reality, (ii) migration between causally connected domains within the multiverse is physically permitted, and (iii) the time interval left to the onset of the future inflationary phase is sufficient for development of the technology necessary for such inter-domain travel. These stringent requirements diminish the probability of the Final Anthropic Hypothesis being true.

  14. 1990 Weatherization Assistance Program monitoring. Final report

    SciTech Connect

    Samuels, L.S.

    1992-06-19

    The fiscal year 1990 DOE weatherization programs were monitored in Indiana, Ohio, and Wisconsin. The focus of the monitoring was on a total of 18 subgrantees. Separate reports on the monitoring completed on each site was submitted as well as the final summary report for each state. The scope of monitoring consisted of a review of current contracts, budgets, program operating procedures, staffing, inventory control, financial and procurement procedures, review of client files and audit reports, inspection of completed dwelling units and assessment of monitoring, training, and technical assistance provided by the grantees. A random sampling of completed units were selected and visits were made to inspect these weatherized dwellings.

  15. Medical waste irradiation study. Final report

    SciTech Connect

    Adler, R.J.; Stein, J.; Nygard, J.

    1998-07-25

    The North Star Research Corporation Medical Waste project is described in this report, with details of design, construction, operation, and results to date. The project began with preliminary design of the accelerator. The initial design was for a single accelerator chamber with a vacuum tube cavity driver built into the chamber itself, rather than using a commercial tube separate from the RF accelerator. The authors believed that this would provide more adjustability and permit better coupling to be obtained. They did not have sufficient success with that approach, and finally completed the project using a DC accelerator with a unique new scanning system to irradiate the waste.

  16. TRICARE; rare diseases definition. Final rule.

    PubMed

    2010-08-01

    This final rule revises the definition of rare diseases to adopt the definition of a rare disease as promulgated by the National Institutes of Health, Office of Rare Diseases. The rule modification will result in the definition used by the TRICARE program for a rare disease to be consistent with the definition used by the National Institutes of Health and the Food and Drug Administration. TRICARE has generally been applying the broader National Institutes of Health and Food and Drug Administration definitions when making coverage decisions for treatments; therefore, there will be no practical changes for beneficiaries. PMID:20690233

  17. Advanced concurrent-engineering environment. Final report

    SciTech Connect

    Jortner, J.N.; Friesen, J.A.

    1997-07-01

    Sandia demonstrated large-scale visualization in a conference room environment. Project focused in the installation of hardware for visualization and display, and the integration of software tools for design and animation of 3-dimensional parts. Using a high-end visualization server, 3-dimensional modeling and animation software, and leading edge World Wide Web technology, an advanced concurrent engineering environment was simulated where a design team was able to work collectively, rather than as solely disjoint individual efforts. Finally, a successful animation of a Sandia part was demonstrated, and a computer video generated. This video is now accessible on a Sandia internal web server.

  18. Advanced concurrent engineering environment final report

    SciTech Connect

    Jortner, J.N.; Friesen, J.A.; Schwegel, J.

    1997-08-01

    Sandia demonstrated large-scale visualization in a conference room environment. Project focused on the installation of hardware for visualization and display, and the integration of software tools for design and animation of 3-dimensional parts. Using a high-end visualization server, 3-dimensional modeling and animation software, and leading edge World Wide Web technology, and advanced concurrent engineering environment was simulated where a design team was able to work collectively, rather than as solely disjoint individual efforts. Finally, a successful animation of a Sandia part was demonstrated, and a computer video generated. This video is now accessible on a Sandia internal web server.

  19. ATAC Process Proof of Concept Final Report

    SciTech Connect

    Bri Rolston; Sarah Freeman

    2014-03-01

    Researchers at INL with funding from the Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) evaluated a novel approach for near real-time consumption of threat intelligence. Demonstration testing in an industry environment supported the development of this new process to assist the electric sector in securing their critical networks. This report provides the reader with an understanding of the methods used during this proof of concept project. The processes and templates were further advanced with an industry partner during an onsite assessment. This report concludes with lessons learned and a roadmap for final development of these materials for use by industry.

  20. Si concentrator solar cell development. [Final report

    SciTech Connect

    Krut, D.D.

    1994-10-01

    This is the final report of a program to develop a commercial, high-efficiency, low-cost concentrator solar cell compatible with Spectrolab`s existing manufacturing infrastructure for space solar cells. The period covered is between 1991 and 1993. The program was funded through Sandia National Laboratories through the DOE concentrator initiative and, was also cost shared by Spectrolab. As a result of this program, Spectrolab implemented solar cells achieving an efficiency of over 19% at 200 to 300X concentration. The cells are compatible with DOE guidelines for a cell price necessary to achieve a cost of electricity of 12 cents a kilowatthour.

  1. Final Report: Performance Engineering Research Institute

    SciTech Connect

    Mellor-Crummey, John

    2014-10-27

    This document is a final report about the work performed for cooperative agreement DE-FC02-06ER25764, the Rice University effort of Performance Engineering Research Institute (PERI). PERI was an Enabling Technologies Institute of the Scientific Discovery through Advanced Computing (SciDAC-2) program supported by the Department of Energy's Office of Science Advanced Scientific Computing Research (ASCR) program. The PERI effort at Rice University focused on (1) research and development of tools for measurement and analysis of application program performance, and (2) engagement with SciDAC-2 application teams.

  2. Gelcasting of aluminum titanate. Final report

    SciTech Connect

    Nunn, S.D.; Stephan, J.E.

    1997-08-01

    This Cooperative Research and Development Agreement (CRADA) was undertaken to assess the applicability of the gelcasting process for forming automotive exhaust port liner green bodies using Golden Technologies` proprietary aluminum titanate powder composition. A gelcasting process, specifically tailored to Golden Technologies` powder, was developed and used successfully to form green bodies for property evaluation. Using appropriate milling and firing conditions, it was found that the gelcast material had properties which compared favorably with Golden Technologies` baseline material. Tubular gelcast samples simulating exhaust port liners were prepared and shipped to Golden Technologies for final process evaluation.

  3. SLS LATTICE FINALIZATION AND MAGNET GIRDER DESIGN

    SciTech Connect

    Ruland, Robert E.

    2003-05-06

    We describe the studies on dynamic aperture for the Swiss Light Source (SLS) 2.4 GeV storage ring including mini gap insertion devices, magnet misalignments and magnet multipole errors. We present a novel method for calculating the Touschek relevant effective lattice momentum acceptance and lifetime. Finally we describe the design of girders optimized for static and dynamic fatigue with high precision mounting of magnets on girders and a system of girder movers to be used for alignment of the girders around the ring.

  4. Cost comparisons of alternative landfill final covers

    SciTech Connect

    Dwyer, S.F.

    1997-02-01

    A large-scale field demonstration comparing and contrasting final landfill cover designs has been constructed and is currently being monitored. Four alternative cover designs and two conventional designs (a RCRA Subtitle ``D`` Soil Cover and a RCRA Subtitle ``C`` Compacted Clay Cover) were constructed of uniform size, side-by-side. The demonstration is intended to evaluate the various cover designs based on their respective water balance performance, ease and reliability of construction, and cost. This paper provides an overview of the construction costs of each cover design.

  5. LC-finer catalyst testing. Final report

    SciTech Connect

    Garg, D.; Bronfenbrenner, J.C.

    1983-09-01

    The activity and aging rate of modified Shell 324 Ni-Mo-Al catalyst were studied in ICRC's process development unit (PDU) under SRC-I Demonstration Plant hydroprocessing conditions. The studies determined variations in SRC conversion, hydrocarbon gas production, hydrogen consumption, and heteroatom removal at both constant and increasing reaction temperatures. Samples of spent catalyst were analyzed to ascertain the reasons for catalyst deactivation. Finally, the PDU hydroprocessing results were compared with those generated at Lummus and Wilsonville pilot plants. 14 references, 25 figures, 16 tables.

  6. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  7. {psi}'' Decays to charmless final states

    SciTech Connect

    Rosner, Jonathan L. . E-mail: rosner@hep.uchicago.edu

    2005-09-01

    The importance of measuring the non-DD-bar decays of the {psi}''={psi}(3770) resonance is discussed. These decays can shed light on a possible discrepancy between the total and DD-bar cross-sections at the {psi}'', and on a proposed mechanism for enhancement of penguin amplitudes in B meson decays through charm-anticharm annihilation. Measurements (including the {psi}'' line shape) in states of definite G-parity and in inclusive charmless final states such as {eta}'+X are found to be particularly important.

  8. OARE STS-78 (LMS-1) Final Report

    NASA Technical Reports Server (NTRS)

    Rice, James E.

    1996-01-01

    The report is organized into sections representing the phases of work performed in analyzing the STS-78 (LMS-1) results. Section 1 briefly outlines the Orbital Acceleration Research Experiment (OARE) system features, coordinates, and measurement parameters. Section 2 describes the results from STS-78. The mission description, data calibration, and representative data obtained on STS-78 are presented. Also, the anomalous performance of OARE on STS-78 is discussed. Finally, Section 3 presents a discussion of accuracy achieved and achievable with OARE. Appendix A discusses the data processing methodology in detail.

  9. The wave has finally broken: now what?

    PubMed Central

    Simborg, Donald W; Detmer, Don Eugene; Berner, Eta S

    2013-01-01

    In 2005, the authors published a paper, ‘Will the wave finally break? A brief view of the adoption of electronic medical records in the United States’, which predicted that rapid adoption of electronic health records (EHR) would occur in the next 5 years given appropriate incentives. The wave has finally broken with the stimulus of the health information technology for economic and clinical health legislation in 2009, and there have been both positive and negative developments in the ensuing years. The positive developments, among others described, are increased adoption of EHR, the emergence of a national network infrastructure and the recognition of clinical informatics as a medical specialty. Problems that still exist include, among others described, continued user interface problems, distrust of EHR-generated notes and an increased potential for fraud and abuse. It is anticipated that in the next 5 years there will be near universal EHR adoption, greater emphasis on standards and interoperability, greater involvement of Congress in health information technology (IT), breakthroughs in user interfaces, compelling online medical and IT education, both increased use of data analytics for personalized healthcare and a realization of the difficulties of this approach, a blurring of the distinction between EHR and telemedicine, a resurgence of computer-assisted diagnosis and the emergence of a ‘continuously learning’ healthcare system. PMID:23538723

  10. Hydrothermal reaction of fly ash. Final report

    SciTech Connect

    Brown, P.W.

    1994-12-31

    The reactions which occur when fly ash is treated under hydrothermal conditions were investigated. This was done for the following primary reasons. The first of these is to determine the nature of the phases that form to assess the stabilities of these phases in the ambient environment and, finally, to assess whether these phases are capable of sequestering hazardous species. The second reason for undertaking this study was whether, depending on the composition of the ash and the presence of selected additives, it would be possible under hydrothermal conditions to form compounds which have cementitious properties. Formation of four classes of compounds, which bracket likely fly ash compositional ranges, were selected for study. The classes are calcium silicate hydrates, calcium selenates, and calcium aluminosulfates, and silicate-based glasses. Specific compounds synthesized were determined and their stability regions assessed. As part of stability assessment, the extent to which selected hazardous species are sequestered was determined. Finally, the cementing properties of these compounds were established. The results obtained in this program have demonstrated that mild hydrothermal conditions can be employed to improve the reactivity of fly ash. Such improvements in reactivity can result in the formation of monolithic forms which may exhibit suitable mechanical properties for selected applications as building materials. If the ashes involved are considered hazardous, the mechanical properties exhibited indicated the forms could be handled in a manner which facilitates their disposal.

  11. Energy Impact Illinois - Final Technical Report

    SciTech Connect

    Olson, Daniel; Plagman, Emily; Silberhorn, Joey-Lin

    2014-02-18

    Energy Impact Illinois (EI2) is an alliance of government organizations, nonprofits, and regional utility companies led by the Chicago Metropolitan Agency for Planning (CMAP) that is dedicated to helping communities in the Chicago metropolitan area become more energy efficient. Originally organized as the Chicago Region Retrofit Ramp-Up (CR3), EI2 became part of the nationwide Better Buildings Neighborhood Program (BBNP) in May 2010 after receiving a $25 million award from the U.S. Department of Energy (DOE) authorized through the American Recovery and Reinvestment Act of 2009 (ARRA). The program’s primary goal was to fund initiatives that mitigate barriers to energy efficiency retrofitting activities across residential, multifamily, and commercial building sectors in the seven-county CMAP region and to help to build a sustainable energy efficiency marketplace. The EI2 Final Technical Report provides a detailed review of the strategies, implementation methods, challenges, lessons learned, and final results of the EI2 program during the initial grant period from 2010-2013. During the program period, EI2 successfully increased direct retrofit activity in the region and was able to make a broader impact on the energy efficiency market in the Chicago region. As the period of performance for the initial grant comes to an end, EI2’s legacy raises the bar for the region in terms of helping homeowners and building owners to take action on the continually complex issue of energy efficiency.

  12. The Remote Security Station (RSS) final report

    SciTech Connect

    Pletta, J.B.; Amai, W.A.; Klarer, P.; Frank, D.; Carlson, J.; Byrne, R.

    1992-10-01

    The Remote Security Station (RSS) was developed by Sandia National Laboratories for the Defense Nuclear Agency to investigate issues pertaining to robotics and sensor fusion in physical security systems. This final report documents the status of the RSS program at its completion in April 1992. The RSS system consists of the Man Portable Security Station (MaPSS) and the Telemanaged Mobile Security Station (TMSS), which are integrated by the Operator's Control Unit (OCU) into a flexible exterior perimeter security system. The RSS system uses optical, infrared, microwave, and acoustic intrusion detection sensors in conjunction with sensor fusion techniques to increase the probability of detection and to decrease the nuisance alarm rate of the system. Major improvements to the system developed during the final year are an autonomous patrol capability, which allows TMSS to execute security patrols with limited operator interaction, and a neural network approach to sensor fusion, which significantly improves the system's ability to filter out nuisance alarms due to adverse weather conditions.

  13. The Remote Security Station (RSS) final report

    SciTech Connect

    Pletta, J.B.; Amai, W.A.; Klarer, P.; Frank, D.; Carlson, J.; Byrne, R.

    1992-10-01

    The Remote Security Station (RSS) was developed by Sandia National Laboratories for the Defense Nuclear Agency to investigate issues pertaining to robotics and sensor fusion in physical security systems. This final report documents the status of the RSS program at its completion in April 1992. The RSS system consists of the Man Portable Security Station (MaPSS) and the Telemanaged Mobile Security Station (TMSS), which are integrated by the Operator`s Control Unit (OCU) into a flexible exterior perimeter security system. The RSS system uses optical, infrared, microwave, and acoustic intrusion detection sensors in conjunction with sensor fusion techniques to increase the probability of detection and to decrease the nuisance alarm rate of the system. Major improvements to the system developed during the final year are an autonomous patrol capability, which allows TMSS to execute security patrols with limited operator interaction, and a neural network approach to sensor fusion, which significantly improves the system`s ability to filter out nuisance alarms due to adverse weather conditions.

  14. AFRIMETS. L-S3 final report

    NASA Astrophysics Data System (ADS)

    Amer, M.; Abdel Aziz, F.; Kareem, Rawaa F.; Dibo, Mayada; Deebajeh, Sukaina; Mekki, Abdeljelil; Krugar, Oelof

    2015-01-01

    A round robin comparison in calibration of gauge blocks by mechanical comparison methods between NMIs of Arab countries in addition to the NMI of South Africa was carried out during the period of November 2011 to July 2013, The Arab Federation for Metrology (AFM) identification number for this comparison is: ARABMET L.S.1. NIS-Egypt acted as the pilot laboratory. One set of gauge blocks, with nominal size: 1 mm, 5 mm, 10 mm, 40 mm, 90 mm were circulated. This comparison was registered in the BIPM KCDB in June 2012 as an AFRIMETS supplementary comparison under the identifier AFRIMETS.L-S3. The results obtained are presented in this report. Coordination of the programme has been done by the AFM technical support unit. Main text. To reach the main text of this paper, click on Final Report. Note that this text is that which appears in Appendix B of the BIPM key comparison database kcdb.bipm.org/. The final report has been peer-reviewed and approved for publication by the CCL, according to the provisions of the CIPM Mutual Recognition Arrangement (CIPM MRA).

  15. The new ozone monitor. Final report

    SciTech Connect

    Karlson, E.L.

    1994-09-20

    This report describes the development of an invention for measuring the concentration of ozone by measuring the heat evolved when the ozone is catalyzed and converted back to oxygen. This ozone monitor evolved through a number of prototype as described in the final report. The final instrument is accurate, reliable and can be installed as a part of a control system. This instrument can be built and calibrated for any necessary specific ozone concentration range. This instrument uses inexpensive parts and would be simple to maintain. the manufacturing cost is less than any equally reliable and accurate ozone monitor presently available. The advantage this system has is that the ozone is directly measured as the temperature of the catalyst. It does not need UV lamps (which continually degrade in use and have a variable life) or use any chemistry where a material is continuously used up. This new ozone monitor directly measures the heat that is generated from the ozone as it converts back into oxygen as the gas mixture flows through the catalyst. The catalyst has theocratically an infinite life. It can clog if the system it is installed in, is dusty. But in systems that produce ozone, it is important that the gas is clean. Under normal clean gas conditions this instrument will give long term service free monitoring.

  16. Multiloop Integral System Test (MIST): Final report

    SciTech Connect

    Klingenfus, J.A.; Parece, M.V.

    1989-12-01

    The multiloop integral system test (MIST) facility is part of a multiphase program started in 1983 to address small-break loss-of- coolant accidents (SBLOCAs) specific to Babcock Wilcox (B W) designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the B W Owners group, the Electric Power Research Institute, and B W. The unique features of the B W design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to address the thermal-hydraulic SBLOCA questions. MIST and two other supporting facilities were specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and the other facilities will be used to benchmark the adequacy of system codes, such a RELAP5/MOD2 and TRAC-PF1, for predicting abnormal plant transients. The MIST program included funding for seven individual RELAP pre- and post-test predictions. The comparisons against data and final conclusions are the subject of this volume of the MIST Final Report. 15 refs., 227 figs., 17 tabs.

  17. MIST (multiloop integral system test) final report

    SciTech Connect

    Klingenfus, J.A.; Parece, M.V. . Engineering and Plant Services Div.)

    1990-04-01

    The multiloop integral system test (MIST) facility is part of a multiphase program started in 1983 to address small-break loss-of- coolant accidents (SBLOCAs) specific to Babcock Wilcox (B W) designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the B W Owners Group, the Electric Power Research Institute, and B W. The unique features of the B W design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to address the thermal-hydraulic SBLOCA questions. MIST and two other supporting facilities were specifically designed and constructed for this program, and an existing facility --- the once-through integral system (OTIS) --- was also used. Data from MIST and the other facilities will be used to benchmark the adequacy of system codes, such as RELAP5/MOD2 and TRAC-PF1, for predicting abnormal plant transients. The MIST program included funding for seven individual RELAP pre- and post-test predictions. The comparisons against data and final conclusions are the subject of this volume of the MIST Final Report. 15 refs., 227 figs., 18 tabs.

  18. The wave has finally broken: now what?

    PubMed

    Simborg, Donald W; Detmer, Don Eugene; Berner, Eta S

    2013-06-01

    In 2005, the authors published a paper, 'Will the wave finally break? A brief view of the adoption of electronic medical records in the United States', which predicted that rapid adoption of electronic health records (EHR) would occur in the next 5 years given appropriate incentives. The wave has finally broken with the stimulus of the health information technology for economic and clinical health legislation in 2009, and there have been both positive and negative developments in the ensuing years. The positive developments, among others described, are increased adoption of EHR, the emergence of a national network infrastructure and the recognition of clinical informatics as a medical specialty. Problems that still exist include, among others described, continued user interface problems, distrust of EHR-generated notes and an increased potential for fraud and abuse. It is anticipated that in the next 5 years there will be near universal EHR adoption, greater emphasis on standards and interoperability, greater involvement of Congress in health information technology (IT), breakthroughs in user interfaces, compelling online medical and IT education, both increased use of data analytics for personalized healthcare and a realization of the difficulties of this approach, a blurring of the distinction between EHR and telemedicine, a resurgence of computer-assisted diagnosis and the emergence of a 'continuously learning' healthcare system. PMID:23538723

  19. Diode and Final Focus Simulations for DARHT

    NASA Astrophysics Data System (ADS)

    Hughes, Thomas P.; Welch, Dale R.; Carlson, Randolph L.

    1997-05-01

    We have used the numerical simulation codes uc(ivory,) uc(iprop) and uc(pbguns) to simulate beam dynamics in the diode and final focus of the 4 kA, 20 MV DARHT linear accelerator. A low emittance 4 MV, 4 kA source for a 4-pulse injector was designed using uc(ivory) and uc(pbguns.) Due to the long pulse length (four 70 ns pulses over 1 μsec), we have kept the field stress to < 200 kV/cm over the cathode electrode, and to ≈ 50 kV/cm on the radial insulator stacks. The normalized edge emittance produced by the diode optics is only ≈ 130 mm-mrad. In the final-focus region, we have used uc(iprop) to model the effect of ion emission from the target. The intense electric field of the beam at the 1 mm diameter focal spot produces substantial ion velocities, and, if the space-charge-limited current density can be supplied, significant focal spot degradation may occur due to ion space-charge. Calculations for the ITS test stand, which has a larger focal spot, show that the effect should be observable for H^+ and C^+ ion species. The effect may be lessened if there is insufficient ion density on the target to supply the space-charge-limited current density, or if the ion charge-to-mass ratio is sufficiently large.

  20. Genetic Information Nondiscrimination Act. Final rule.

    PubMed

    2016-05-17

    The Equal Employment Opportunity Commission (EEOC or Commission) is issuing a final rule to amend the regulations implementing Title II of the Genetic Information Nondiscrimination Act of 2008 as they relate to employer-sponsored wellness programs. This rule addresses the extent to which an employer may offer an inducement to an employee for the employee's spouse to provide information about the spouse's manifestation of disease or disorder as part of a health risk assessment (HRA) administered in connection with an employer-sponsored wellness program. Several technical changes to the existing regulations are included. Published elsewhere in this issue of the Federal Register, the EEOC also issued a final rule to amend the regulations and interpretive guidance implementing Title I of the Americans with Disabilities Act (ADA) that addresses the extent to which employers may use incentives to encourage employees to participate in wellness programs that ask them to respond to disability-related inquiries and/or undergo medical examinations. PMID:27192741

  1. Summer 1994 Computational Science Workshop. Final report

    SciTech Connect

    1994-12-31

    This report documents the work performed by the University of New Mexico Principal Investigators and Research Assistants while hosting the highly successful Summer 1994 Computational Sciences Workshop in Albuquerque on August 6--11, 1994. Included in this report is a final budget for the workshop, along with a summary of the participants` evaluation of the workshop. The workshop proceeding have been delivered under separate cover. In order to assist in the organization of future workshops, we have also included in this report detailed documentation of the pre- and post-workshop activities associated with this contract. Specifically, we have included a section that documents the advertising performed, along with the manner in which applications were handled. A complete list of the workshop participants in this section. Sample letters that were generated while dealing with various commercial entities and departments at the University are also included in a section dealing with workshop logistics. Finally, we have included a section in this report that deals with suggestions for future workshops.

  2. Facilities management system (FMS). Final report

    SciTech Connect

    1992-04-01

    The remainder of this report provides a detailed, final status of Andersen Consulting`s participation in the FMS systems implementation project and offers suggestions for continued FMS improvements. The report presents the following topics of discussion: (1) Summary and Status of Work (2) Recommendations for Continued Success (3) Contract Deliverables and Client Satisfaction The Summary and Status of Work section presents a detailed, final status of the FMS project at the termination of Andersen`s full-time participation. This section discusses the status of each FMS sub-system and of the Andersen major project deliverables. The Recommendations section offers suggestions for continued FMS success. The topics discussed include recommendations for each of the following areas: (1) End User and Business Operations (2) AISD; Development and Computer Operations (3) Software (4) Technical Platform (5) Control Procedures The Contract Deliverables and Client Satisfaction section discusses feedback received from Johnson Controls management and FMS system users. The report also addresses Andersen`s observations from the feedback.

  3. Facilities management system (FMS). Final report

    SciTech Connect

    1992-04-01

    This report provides a detailed, final status of Andersen Consulting`s participation in the Facilities Management System (FMS) implementation project under contract with Los Alamos National Laboratory (LANL) and offers suggestions for continued FMS improvements. The report presents the following topics of discussion: (1) summary and status of work (2) recommendations for continued success (3) contract deliverables and client satisfaction. The Summary and Status of Work section presents a detailed, final status of the FMS project at the termination of Andersen`s full-time participation. This section discusses the status of each FMS sub-system and of the Andersen major project deliverables. The Recommendations section offers suggestions for continued FMS success. The topics discussed include recommendations for each of the following areas: (1) End User and Business Operations; (2) AISD; Development and Computer Operations; (3) Software; (4) Technical Platform; and (5) Control Procedures The Contract Deliverables and Client Satisfaction section discusses feedback received from Johnson Controls management and FMS system users. The report also addresses Andersen`s observations from the feedback.

  4. Final state interactions in hadronic B decays

    NASA Astrophysics Data System (ADS)

    Cheng, Hai-Yang; Chua, Chun-Khiang; Soni, Amarjit

    2005-01-01

    There exist many experimental indications that final-state interactions (FSIs) may play a prominent role not only in charmful B decays but also in charmless B ones. We examine the final-state rescattering effects on the hadronic B decay rates and their impact on direct CP violation. The color-suppressed neutral modes such as B0→D0π0,π0π0,ρ0π0,K0π0 can be substantially enhanced by long-distance rescattering effects. The direct CP-violating partial rate asymmetries in charmless B decays to ππ/πK and ρπ are significantly affected by final-state rescattering, and their signs are generally different from that predicted by the short-distance (SD) approach. For example, direct CP asymmetry in B0→ρ0π0 is increased to around 60% due to final-state rescattering effects whereas the short-distance picture gives about 1%. Evidence of direct CP violation in the decay B¯0→K-π+ is now established, while the combined BABAR and Belle measurements of B¯0→ρ±π∓ imply a 3.6σ direct CP asymmetry in the ρ+π- mode. Our predictions for CP violation agree with experiment in both magnitude and sign, whereas the QCD factorization predictions (especially for ρ+π-) seem to have some difficulty with the data. Direct CP violation in the decay B-→π-π0 is very small (≲1%) in the standard model even after the inclusion of FSIs. Its measurement will provide a nice way to search for new physics as in the standard model QCD penguins cannot contribute (except by isospin violation). Current data on πK modes seem to violate the isospin sum-rule relation, suggesting the presence of electroweak penguin contributions. We have also investigated whether a large transverse polarization in B→ϕK* can arise from the final-state rescattering of D(*)D¯(*)s into ϕK*. While the longitudinal polarization fraction can be reduced significantly from short-distance predictions due to such FSI effects, no sizable perpendicular polarization is found owing mainly to the large

  5. Medicare Program; Obtaining Final Medicare Secondary Payer Conditional Payment Amounts via Web Portal. Final rule.

    PubMed

    2016-05-17

    This final rule specifies the process and timeline for expanding CMS' existing Medicare Secondary Payer (MSP) Web portal to conform to section 201 of the Medicare IVIG and Strengthening Medicare and Repaying Taxpayers Act of 2012 (the SMART Act). The final rule specifies a timeline for developing a multifactor authentication solution to securely permit authorized users other than the beneficiary to access CMS' MSP conditional payment amounts and claims detail information via the MSP Web portal. It also requires that we add functionality to the existing MSP Web portal that permits users to: Notify us that the specified case is approaching settlement; obtain time and date stamped final conditional payment summary statements and amounts before reaching settlement; and ensure that relatedness disputes and any other discrepancies are addressed within 11 business days of receipt of dispute documentation. PMID:27192735

  6. 48 CFR 49.303-5 - Final settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....303-5 Final settlement. (a) The TCO shall proceed with the settlement and execution of a settlement... vouchered costs. (b) The TCO shall adjust the fee as provided in 49.305. (c) The final settlement...

  7. 48 CFR 49.303-5 - Final settlement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....303-5 Final settlement. (a) The TCO shall proceed with the settlement and execution of a settlement... vouchered costs. (b) The TCO shall adjust the fee as provided in 49.305. (c) The final settlement...

  8. 38 CFR 75.119 - Finality of Secretary determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) INFORMATION SECURITY MATTERS Data Breaches § 75.119 Finality of Secretary determination. A determination made by the Secretary under this subpart will be a final agency decision. 38 CFR Ch. II...

  9. 21 CFR 640.82 - Tests on final product.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... solution of the final product diluted to a concentration of 1 percent protein with 0.15 molar sodium chloride. (d) Sodium concentration. The sodium concentration of the final product shall be 130 to...

  10. 21 CFR 640.82 - Tests on final product.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... solution of the final product diluted to a concentration of 1 percent protein with 0.15 molar sodium chloride. (d) Sodium concentration. The sodium concentration of the final product shall be 130 to...

  11. 21 CFR 640.82 - Tests on final product.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... solution of the final product diluted to a concentration of 1 percent protein with 0.15 molar sodium chloride. (d) Sodium concentration. The sodium concentration of the final product shall be 130 to...

  12. 21 CFR 640.82 - Tests on final product.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... solution of the final product diluted to a concentration of 1 percent protein with 0.15 molar sodium chloride. (d) Sodium concentration. The sodium concentration of the final product shall be 130 to...

  13. 48 CFR 242.705 - Final indirect cost rates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Final indirect cost rates..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 242.705 Final indirect cost rates....

  14. 15 CFR 301.7 - Final disposition of an application.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND APPARATUS FOR EDUCATIONAL AND SCIENTIFIC INSTITUTIONS § 301.7 Final disposition of an application. (a) Disposition of an application shall be final when 20 days have elapsed after publication of...

  15. 21 CFR 640.103 - The final product.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 7 2011-04-01 2010-04-01 true The final product. 640.103 Section 640.103 Food and... ADDITIONAL STANDARDS FOR HUMAN BLOOD AND BLOOD PRODUCTS Immune Globulin (Human) § 640.103 The final product. (a) Final solution. The final product shall be a 16.5 ±1.5 percent solution of globulin containing...

  16. FFTF Final Safety Analysis Report Amendment 82

    SciTech Connect

    DAUTEL, W.A.

    2003-03-01

    This is the Final Safety Analysis Report (FSAR) Amendment 82 for incorporation into the Fast Flux Test Facility (FFTF) FSAR set assigned to you. This page change amendment incorporates changes previously approved by the U.S. Department of Energy, Richland Operations Office. This amendment provides updates to the FSAR to facilitate FFTF shutdown and deactivation. Among the changes are the following: Chapter 11 is updated to describe upgrades to the Solid Waste Cask. Additional fuel handling accidents are added to Chapter 15. Appendix G is revised to clearly identify systems and their safety functions. Appendix H is revised to remove the discussion of material that has been removed from the Interim Storage Area. Appendix I is revised to provide a general description of liquid metal removal from FFTF. Other changes include minor technical updates from the FSAR annual review and editorial and procedure references.

  17. Final report for task order No. 26

    SciTech Connect

    Trela, W.J.

    1995-10-01

    This is a final report for task order No. 26 between the University of California, Los Alamos National Laboratory and Sumner Associates issued 20 March, 1995. The task statement for order No. 26 is as follows: {open_quotes}Provide assistance on the design of experimental arrangements for acquisition of data describing the interaction of neutrons with selected materials arranged in geometry.{close_quotes} {open_quotes}Provide assistance in the delivery of drawings and specifications associated with the task.{close_quotes} Three experimental descriptions follow; Dynamic Temperature Measurements in Explosives and Inert Simulants Using Neutron Resonance Radiography, Measurements of the Phonon Frequency Spectrum of Pu from Neutron Resonance Broadening, and Resonant Neutron Absorption Spectroscopy of Hi-Temperature Superconductors, that fulfill the task statement.

  18. Dinitrotoluene in deer tissues. Final report

    SciTech Connect

    Shugart, L.R.

    1991-09-30

    Badger Army Ammunition Plant (BAAP), Baraboo, Wisconsin, has within a security-fenced area, a herd of whitetail deer. The US Army and the State of Wisconsin, Department of Health and Social Services have determined that approximately 20 of the deer be harvested and tissue samples thus collected be analyzed for 2,4- and 2,6-dinitrotoluene (2,4- and 2,6-DNT) by high pressure liquid chromatography (HPLC) to a sensitivity of 0.1 part per million (ppm). The HPLC analyses will be done at the Oak Ridge National Laboratory (ORNL) following protocol used previously for similar work for other government sites. ORNL shall instruct Olin relative to the quantity and type of tissue required, storage and shipment requirements, and other information to ensure that all protocol and chain of custody requirements are clear. A final report will be made to Olin Corporation upon completion of the HPLC analyses.

  19. TRICARE: smoking cessation program. Final rule.

    PubMed

    2013-02-27

    This final rule implements Section 713 of the Duncan Hunter National Defense Authorization Act (NDAA) for Fiscal Year 2009. Section 713 states the Secretary shall establish a smoking cessation program under the TRICARE program. The smoking cessation program under TRICARE shall, at a minimum, include the following: The availability, at no cost to the beneficiary, of pharmaceuticals used for smoking cessation, with the limitation on the availability of such pharmaceuticals to the mail-order pharmacy program under the TRICARE program; smoking cessation counseling; access to a toll-free quit line 24 hours a day, 7 days a week; access to print and Internet web-based tobacco cessation material. Per the statute, Medicare-eligible beneficiaries are excluded from the TRICARE smoking cessation program. PMID:23476993

  20. Parabolic dish module experiment. Final test report

    SciTech Connect

    Not Available

    1986-03-01

    A development test model of the 8-meter Solar Brayton Parabolic Dish Module has been designed, fabricated, and tested. The test model consists of five major subsystems: Sanders ceramic honeycomb solar receiver; LaJet LEC460 solar concentrator; AiRsearch SABC MKIIIA engine, Abacus 8 kW ac inverter; and a Sanders designed and built system controller. Goals of the tests were to integrate subsystem components into a working module, demonstrate the concept, and generate 5 kWe (hybrid) and 4.7 kWe (solar only) input. All subsystem integration goals were successfully achieved, but system performance efficiency was lower than expected. Contributing causes of the lower performance efficiencies have been identified. Modifications needed to restore performance to the required levels and improve the system life cycle cost have been addressed and are the subject of this final report.

  1. Neurons to algorithms LDRD final report.

    SciTech Connect

    Rothganger, Fredrick H.; Aimone, James Bradley; Warrender, Christina E.; Trumbo, Derek

    2013-09-01

    Over the last three years the Neurons to Algorithms (N2A) LDRD project teams has built infrastructure to discover computational structures in the brain. This consists of a modeling language, a tool that enables model development and simulation in that language, and initial connections with the Neuroinformatics community, a group working toward similar goals. The approach of N2A is to express large complex systems like the brain as populations of a discrete part types that have specific structural relationships with each other, along with internal and structural dynamics. Such an evolving mathematical system may be able to capture the essence of neural processing, and ultimately of thought itself. This final report is a cover for the actual products of the project: the N2A Language Specification, the N2A Application, and a journal paper summarizing our methods.

  2. Final Technical Progress Report NANOSTRUCTURED MAGNETIC MATERIALS

    SciTech Connect

    Charles M. Falco

    2012-09-13

    This report describes progress made during the final phase of our DOE-funded program on Nanostructured Magnetic Materials. This period was quite productive, resulting in the submission of three papers and presentation of three talks at international conferences and three seminars at research institutions. Our DOE-funded research efforts were directed toward studies of magnetism at surfaces and interfaces in high-quality, well-characterized materials prepared by Molecular Beam Epitaxy (MBE) and sputtering. We have an exceptionally well-equipped laboratory for these studies, with: Thin film preparation equipment; Characterization equipment; Equipment to study magnetic properties of surfaces and ultra-thin magnetic films and interfaces in multi-layers and superlattices.

  3. Integrated Product Development and Networking. Final report

    SciTech Connect

    Gates, A.M.; Young, W.K.

    1993-08-01

    The purpose of the Integrated Product Development and Networking study was to research the spacecraft manufacturing processes at TRW Space and Electronics Group, and generate recommendations regarding the implementation of an automated spacecraft assembly system. TRW detailed in the previous interim report the current {open_quotes}As-Is{close_quotes} process in relation to the flow and dissemination of production and logistics data. The reports focused on current spacecraft assembly programs being performed at TRW Redondo Beach, specifically on the Brilliants Eyes and GPALS programs. The report identified: (1) the functional organizations and their inter-relationships, (2) current electronic information support systems, and (3) related automation tools, procedures and practices. This Final Report details the recommendations related to the implementation for an automated spacecraft assembly system.

  4. Final Report: Correctness Tools for Petascale Computing

    SciTech Connect

    Mellor-Crummey, John

    2014-10-27

    In the course of developing parallel programs for leadership computing systems, subtle programming errors often arise that are extremely difficult to diagnose without tools. To meet this challenge, University of Maryland, the University of Wisconsin—Madison, and Rice University worked to develop lightweight tools to help code developers pinpoint a variety of program correctness errors that plague parallel scientific codes. The aim of this project was to develop software tools that help diagnose program errors including memory leaks, memory access errors, round-off errors, and data races. Research at Rice University focused on developing algorithms and data structures to support efficient monitoring of multithreaded programs for memory access errors and data races. This is a final report about research and development work at Rice University as part of this project.

  5. Fuel consolidation demonstration program: Final Report

    SciTech Connect

    Not Available

    1990-06-01

    EPRI, Northeast Utilities, Baltimore Gas and Electric, the US Department of Energy and Combustion Engineering are engaged in a program to develop a system for consolidating spent fuel and a method of storing the consolidated fuel in the spent fuel storage pool which is licensable by the US Nuclear Regulatory Commission. Fuel consolidation offers a means of substantially increasing the capacity of spent fuel storage pools. This is a final report of the Fuel Consolidation Demonstration Program. It provides a review of the overall program, a summary of the results obtained, the lessons learned, and an assessment of the present status of the consolidation system developed in the program. 7 refs., 15 figs., 5 tabs.

  6. AISI Direct Steelmaking Program. Final technical report

    SciTech Connect

    Aukrust, E.

    1994-08-01

    This final report deals with the results of a 5-yr project for developing a more energy-efficient, environmentally friendly, less costly process for producing hot metal than current coke ovens and blast furnaces. In the process, iron ore pellets are smelted in a foamy slag created by reaction of coal char with molten slag to produce CO. The CO further reacts with oxygen, which also reacts with coal volatile matter, to produce the heat necessary to sustain the endothermic reduction reaction. The uncombusted CO and H{sub 2} from the coal are used to preheat and prereduce hematite pellets for the most efficient use of the energy in the coal. Laboratory programs confirmed that the process steps worked. Pilot plant studies were successful. Economic analysis for a 1 million tpy plant is promising.

  7. Revised Final DOE10-7-13

    SciTech Connect

    Gilbreath, Bob; Maples, Manuel G

    2013-10-07

    The project goal was reduction of energy consumption on a group of multi-use buildings. The initial step was to assess the group of buildings and define a set of Energy Conservation Measures (ECM?s) that would return an average energy consumption savings of thirty percent. The assessments defined deficiencies in systems from building envelope to interior lighting. Corrections for the deficiencies were addressed through ECM?s that included: high efficiency lighting, occupancy sensors, programmable thermostats, HVAC upgrades, insulation upgrades, as well as a solar thermal installation to reduce propane consumption. ECM?s were recommended based on calculated energy savings. ECM implementation was performed using licensed professionals across multiple disciplines. Electricians installed new lighting and set up occupancy sensors while plumbers implemented low flow fixtures and insulated water heater systems. A general contractor sealed and repaired building envelopes while overseeing other disciplines. Final energy consumption reductions will exceed thirty percent across nine buildings

  8. Clean Energy Works Oregon Final Technical Report

    SciTech Connect

    Jacob, Andria; Cyr, Shirley

    2013-12-31

    In April 2010, the City of Portland received a $20 million award from the U.S. Department of Energy, as part of the Energy Efficiency and Conservation Block Grant program. This award was appropriated under the American Recovery and Reinvestment Act (ARRA), passed by President Obama in 2009. DOE’s program became known as the Better Buildings Neighborhood Program (BBNP). The BBNP grant objectives directed the City of Portland Bureau of Planning and Sustainability (BPS) as the primary grantee to expand the BPS-led pilot program, Clean Energy Works Portland, into Clean Energy Works Oregon (CEWO), with the mission to deliver thousands of home energy retrofits, create jobs, save energy and reduce carbon dioxide emissions.The Final Technical Report explores the successes and lessons learned from the first 3 years of program implementation.

  9. Prototypical Consolidation Demonstration Project: Final report

    SciTech Connect

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy`s Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG&G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG&G Idaho`s assessments of the equipment and procedures developed by NUS.

  10. Jade data transcription system final report

    SciTech Connect

    Eaton, R.; Iskra, M.; McLean, J. . Advanced Technology Div.)

    1990-07-25

    The OWL sensor, which is used in conjunction with the Jade program, generates a tremendous volume of data during normal field operations. Historically, the dissemination of this data to analysts has been slowed by difficulties in transcribing to a widely readable media and format. TRW, under contract from Lawrence Livermore National Laboratory, was tasked by Defense Advanced Research Projects Agency (DARPA) with finding an improved method of transcribing the Jade experimental data. During the period of performance on this contract TRW helped to guide the development and operation of an improved transcription system. This final report summarizes the work performed, and provides a written record of information which may be helpful to future users of the newly developed data transcription system. 4 figs.

  11. Adaptive Gaussian pattern classification. Final report

    SciTech Connect

    Priebe, C.E.; Marchette, D.J.

    1988-08-01

    A massively parallel architecture for pattern classification is described. The architecture is based on the field of density estimation. It makes use of a variant of the adaptive-kernel estimator to approximate the distributions of the classes as a sum of Gaussian distributions. These Gaussians are learned using a moved-mean, moving-covariance learning scheme. A temporal ordering scheme is implemented using decay at the input level, allowing the network to learn to recognize sequences. The learning scheme requires a single pass through the data, giving the architecture the capability of real-time learning. The first part of the paper develops the adaptive-kernel estimator. The parallel architecture is then described, and issues relevant to implementation are discussed. Finally, applications to robotic sensor fusion, intended word recognition, and vision are described.

  12. Neutron Activation of NIF Final Optics Assemblies

    SciTech Connect

    Sitaraman, S; Dauffy, L; Khater, H; Brereton, S

    2009-09-29

    Analyses were performed to characterize the radiation field in the vicinity of the Final Optics Assemblies (FOAs) at the National Ignition Facility (NIF) due to neutron activation following Deuterium-Deuterium (DD), Tritium-Hydrogen-Deuterium (THD), and Deuterium-Tritium (DT) shots associated with different phases of the NIF operations. The activation of the structural components of the FOAs produces one of the larger sources of gamma radiation and is a key factor in determining the stay out time between shots to ensure worker protection. This study provides estimates of effective dose rates in the vicinity of a single FOA and concludes that the DD and THD targets produce acceptable dose rates within 10 minutes following a shot while about 6-days of stay out time is suggested following DT shots. Studies are ongoing to determine the combined effects of multiple FOAs and other components present in the Target Bay on stay-out time and worker dose.

  13. Spine immobilization: prehospitalization to final destination.

    PubMed

    Kang, Daniel G; Lehman, Ronald A

    2011-01-01

    Care of the combat casualty with spinal column or spinal cord injury has not been previously described, particularly in regards to spinal immobilization. The ultimate goal of spinal immobilization in the combat casualty is to first ``do no further harm'' and then provide a stable, painless spine and an optimal neurologic recovery. The protocol for treatment of the combat casualty with suspected spinal column or spinal cord injury from the battlefield to final arrival at a definitive treatment center is discussed, and the special considerations for medical evacuation off the battlefield and for aeromedical transport are delineated. Selective prehospital spine immobilization, which involves spinal immobilization with backboard, semi-rigid cervical collar, lateral supports, and straps or tape, is recommended if there is suspicion of spinal column or spinal cord injury in the combat casualty and when conditions and resources permit. The authors do not recommend spinal immobilization for the combat casualty with isolated penetrating trauma. PMID:21477526

  14. Spacecraft fabrication and test MODIL. Final report

    SciTech Connect

    Saito, T.T.

    1994-05-01

    This report covers the period from October 1992 through the close of the project. FY 92 closed out with the successful briefing to industry and with many potential and important initiatives in the spacecraft arena. Due to the funding uncertainties, we were directed to proceed as if our funding would be approximately the same as FY 92 ($2M), but not to make any major new commitments. However, the MODIL`s FY 93 funding was reduced to $810K and we were directed to concentrate on the cryocooler area. The cryocooler effort completed its demonstration project. The final meetings with the cryocooler fabricators were very encouraging as we witnessed the enthusiastic reception of technology to help them reduce fabrication uncertainties. Support of the USAF Phillips Laboratory cryocooler program was continued including kick-off meetings for the Prototype Spacecraft Cryocooler (PSC). Under Phillips Laboratory support, Gill Cruz visited British Aerospace and Lucas Aerospace in the United Kingdom to assess their manufacturing capabilities. In the Automated Spacecraft & Assembly Project (ASAP), contracts were pursued for the analysis by four Brilliant Eyes prime contractors to provide a proprietary snap shot of their current status of Integrated Product Development. In the materials and structure thrust the final analysis was completed of the samples made under the contract (``Partial Automation of Matched Metal Net Shape Molding of Continuous Fiber Composites``) to SPARTA. The Precision Technologies thrust funded the Jet Propulsion Laboratory to prepare a plan to develop a Computer Aided Alignment capability to significantly reduce the time for alignment and even possibly provide real time and remote alignment capability of systems in flight.

  15. Standard claims and appeals forms. Final rule.

    PubMed

    2014-09-25

    The Department of Veterans Affairs (VA) amends its adjudication regulations and the appeals regulations and rules of practice of the Board of Veterans' Appeals (Board) to require that all claims governed by VA's adjudication regulations be filed on standard forms prescribed by the Secretary, regardless of the type of claim or posture in which the claim arises. This rulemaking also eliminates the constructive receipt of VA reports of hospitalization or examination and other medical records as informal claims for increase or to reopen while retaining the retroactive effective date assignment for awards for claims for increase which are filed on a standard form within 1 year of such hospitalization, examination, or treatment. This final rule also implements the concept of an intent to file a claim for benefits, which operates similarly to the current informal claim process, but requires that the submission establishing a claimant's effective date of benefits must be received in one of three specified formats. Finally, these amendments will provide that VA will accept an expression of dissatisfaction or disagreement with an adjudicative determination by the agency of original jurisdiction(AOJ) as a Notice of Disagreement (NOD) only if it is submitted on a standardized form provided by VA for the purpose of appealing the decision, in cases where such a form is provided. Although a standardized NOD form will only initially be provided in connection with decisions on compensation claims, VA may require a standard NOD form for any type of claim for VA benefits if, in the future, it develops and provides a standardized NOD form for a particular benefit. The purpose of these amendments is to improve the quality and timeliness of the processing of veterans' claims for benefits by standardizing the claims and appeals processes through the use of forms. PMID:25255502

  16. Final report: EURAMET.EM-S39

    NASA Astrophysics Data System (ADS)

    >Helge Malmbekk,

    2015-01-01

    The AC-DC difference of a set of current shunts produced by the Norwegian Metrology Service (Justervesenet), were measured by PTB and Justervesenet, in a bilateral comparison, where Justervesenet acted as the organizer and pilot laboratory. The nominal values of the current shunts are 30 mA, 100 mA, 300 mA, 1 A, 3 A, 5 A, 10 A and 20 A, which were measured at their nominal values for the frequencies 10 Hz, 20 Hz, 55 Hz, 110 Hz, 400 Hz, 1 kHz, 5 kHz, 10 kHz, 20 kHz, 50 kHz and 100 kHz. All current shunts were measured in combination with Planar Multi-junction Thermal Converters produced by PTB. The results show that there is a degree of equivalence within 0.4 for all measured values, and that for frequencies below 10 kHz, the value is typically below 0.2. Hence, there is a very close agreement between the measurements, which are not correlated by traceability chains, and the properties of the current shunts have been documented by the comparison. Main text. To reach the main text of this paper, click on Final Report. Note that this text is that which appears in Appendix B of the BIPM key comparison database kcdb.bipm.org/. The final report has been peer-reviewed and approved for publication by the CCEM, according to the provisions of the CIPM Mutual Recognition Arrangement (CIPM MRA).

  17. Expanded studies of linear collider final focus systems at the Final Focus Test Beam

    SciTech Connect

    Tenenbaum, P.G.

    1995-12-01

    In order to meet their luminosity goals, linear colliders operating in the center-of-mass energy range from 3,50 to 1,500 GeV will need to deliver beams which are as small as a few Manometers tall, with x:y aspect ratios as large as 100. The Final Focus Test Beam (FFTB) is a prototype for the final focus demanded by these colliders: its purpose is to provide demagnification equivalent to those in the future linear collider, which corresponds to a focused spot size in the FFTB of 1.7 microns (horizontal) by 60 manometers (vertical). In order to achieve the desired spot sizes, the FFTB beam optics must be tuned to eliminate aberrations and other errors, and to ensure that the optics conform to the desired final conditions and the measured initial conditions of the beam. Using a combination of incoming-beam diagnostics. beam-based local diagnostics, and global tuning algorithms, the FFTB beam size has been reduced to a stable final size of 1.7 microns by 70 manometers. In addition, the chromatic properties of the FFTB have been studied using two techniques and found to be acceptable. Descriptions of the hardware and techniques used in these studies are presented, along with results and suggestions for future research.

  18. 75 FR 80068 - Notice of Availability of the Final Environmental Impact Report/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    ... Ivanpah substation in California near Primm, Nevada, which would serve as a connector hub for solar energy... proposed in and around the Ivanpah Valley, including the Ivanpah Solar Energy Generation System currently... Bureau of Land Management Notice of Availability of the Final Environmental Impact Report/...

  19. [Geriatric Authority of Holyoke Workplace Literacy Project.] Final Report. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Massachusetts Career Development Inst., Springfield.

    This final report documents the development of a workplace literacy program for 100 employees of the Geriatric Authority of Holyoke, Massachusetts (GAH), a major nonprofit nursing home and rehabilitation facility. It describes how GAH employees received instruction in English as a Second Language, adult basic education, and General Educational…

  20. A Description of Del Mod and Its Final Evaluation, Final Report, Volume I.

    ERIC Educational Resources Information Center

    Purnell, Charlotte H.; Bolig, John R.

    This monograph presents an overview of five Del Mod System final reports, comments by the project director, financial structure of the Del Mod System, and descriptions of Del Mod Projects. The Del Mod System was concerned with changing the science and mathematics education programs in the state of Delaware. Between 1970 and 1976, Del Mod conducted…