Science.gov

Sample records for 2007-2009 plan national

  1. Contribution dynamics in defined contribution pension plans during the great recession of 2007-2009.

    PubMed

    Dushi, Irena; Iams, Howard M; Tamborini, Christopher R

    2013-01-01

    We investigate changes in workers' participation and contributions to defined contribution (DC) plans during the Great Recession of 2007-2009. Using longitudinal information from W-2 tax records matched to a nationally representative sample of respondents from the Survey ofl Income and Program Participation, we find that the recent economic downturn had a considerable impact on workers' participation and contributions to DC plans. Thirty-nine percent of 2007 participants decreased contributions to DC plans by more than 10 percent during the Great Recession. Our findings highlight the interrelationship between the dynamics in DC contributions and earnings changes. Participants experiencing a decrease in earnings of more than 10 percent were not only more likely to stop contributing by 2009 than those with stable earnings (30 percent versus 9 percent), but they also decreased their contributions substantially (-$1,839 versus -$129). The proportion of workers who decreased or stopped contributions during the crisis exceeded the proportion observed prior to it (2005-2007). PMID:23914623

  2. Vegetable intake is associated with lower Frammingham risk scores in Korean men: Korea National Health and Nutrition Survey 2007-2009

    PubMed Central

    Choi, Mi-Kyeong

    2016-01-01

    BACKGROUND/OBJECTIVES Observational studies suggest that an association between vegetable consumption and coronary heart disease (CHD). However, the results are inconsistent. This study aimed to investigate the daily intake of vegetables on a national level and its effect on the risk of CHD risk, as determined by the Framingham Risk Score (FRS). SUBJECTS/METHODS This study was conducted a cross-sectional design of 2,510 male adults 40-64y of age who participated in the 2007-2009 Korean National Health and Nutrition Examination Survey. Daily intake of vegetable was assessed by 24-h recall, and the consumption frequency of vegetables was determined using a food frequency questionnaire. The odd ratio of CHD risk according to daily intake and frequency of vegetables was analyzed. RESULTS Total vegetable intake was inversely and significantly associated with the risk of CHD (Model 1: 4th vs. 1st quartile, OR = 0.74, 95% CI = 0.58-0.96, P for trend = 0.0015), and the significant relationship with CHD risk remained even after adjusting for potential confounders (Model 3: 4th vs. 1st quartile, adjusted OR [aOR] = 0.69, 95% CI = 0.49-0.95, P for trend = 0.0492). Subjects in the higher quartiles of non-salted vegetable intake had 31% lower odds of the risk of CHD compared to those in the lowest quartile after adjusting for various potential confounders in model 3 (aOR = 0.69; 95% CI = 0.49-0.97, P for trend = 0.0478). No significant associations between the frequency of vegetable intake (total, green, white and red vegetable) and the risk of CHD were found. CONCLUSIONS The major results of this study indicate that higher vegetable intake may help prevent CHD in Korean men. PMID:26865921

  3. NAEP Fourth-, Eighth-, and Twelfth-Grade Reading Scores by Gender: 2005, 2007, 2009, 2011, 2013

    ERIC Educational Resources Information Center

    Klecker, Beverly M.

    2014-01-01

    This paper describes a secondary analysis of the National Assessment of Educational Progress (NAEP) reading scores by gender. Data were national public 4th- and 8th-grade reading scores from composite and subscales for 2005, 2007, 2009, 2011, and 2013. Twelfth-grade scores for composite and literary experience from 2005, 2009, and 2013 and gain…

  4. Asthma, Depression, and Suicidality: Results from the 2007, 2009, and 2011 Youth Risk Behavior Surveys.

    PubMed

    Steinberg, Leah; Aldea, Ivanjo; Messias, Erick

    2015-09-01

    We assessed the association between asthma and suicidality in a nationally representative sample of US high school students. Data came from the 2007, 2009, and 2011 Youth Risk Behavioral Surveys. Weighted prevalence estimates and adjusted odds ratios were calculated. Subjects with asthma are more likely to report 2-week sadness (35.2%) compared to those without asthma (26.7%). Teens with asthma are also more likely to report suicide ideation (20.1% vs. 15%), planning (15.7% vs. 12.1%), attempt (10.1% vs. 6.9%), and treatment for attempt (3.5% vs. 2%). Although the unadjusted association between lifetime asthma and suicide attempts is statistically significant (crude odds ratio 1.5 (95% CI 1.3-1.8)), after controlling for confounders, that association is no longer statistically significant (AOR 1.2 (1-1.6)). Thus, this increase in suicidality seems to be due to the increased prevalence of sadness among teens with asthma. Similar patterns were seen in the 2007 and 2009 surveys. PMID:26252825

  5. National Planning for Education.

    ERIC Educational Resources Information Center

    Moon, Rexford G., Jr.

    This report presents the findings of a study on the current status of planning in American higher education and the feasibility of establishing a "national planning congress" for higher education. The study team gathered the views of key people concerned with higher education planning through extensive interviews and seminars throughout the…

  6. Acrylamide monitoring in Switzerland, 2007-2009: results and conclusions.

    PubMed

    Biedermann, M; Grundbock, F; Fiselier, K; Biedermann, S; Burgi, C; Grob, K

    2010-10-01

    Parallel to the European Union acrylamide monitoring for the years 2007-2009, Switzerland performed its own monitoring, covering the whole range of products that significantly contain acrylamide (almost 300 samples per year), but focusing on those products that may result in high exposure. As reducing sugars are critical for potato products, these were included. No significant change, particularly improvement, was noticed, especially regarding those products for which substantial potential for improvement is known. 'Western-style' French fries continued to contain some four times more reducing sugars than 'traditional' fries, with correspondingly higher acrylamide in the finished product. The supply of raw potatoes low in reducing sugars by retail shops needs improvement, but there seemed to be insufficient willingness on a voluntary basis. A foreign producer was successful in penetrating the Swiss market with special potato chips containing up to 7000 microg kg(-1) acrylamide and only harsh measures could stop this. Three of about 61 products in the group of bakery ware showed a marked improvement. But there was also a store brand cracker that competed with a leading brand which contained 15 times more acrylamide (845 microg kg(-1)). Cereals contained 1080 microg kg(-1) acrylamide and even a warning did not prompt the producer to sell substantially better products one year later. It seems that only measures by the authorities will achieve improvements. The following seem promising: a limit for reducing sugars in prefabricates for French fries; the improved supply of raw potatoes low in sugars for roasting and frying; a legal limit for acrylamide content in potato chips; a general provision that products must not contain substantially more acrylamide than achievable by good manufacturing practice; and fryers with a temperature profile from an initial high to a lower final value. PMID:20730646

  7. Planning National Radiotherapy Services

    PubMed Central

    Rosenblatt, Eduardo

    2014-01-01

    Countries, states, and island nations often need forward planning of their radiotherapy services driven by different motives. Countries without radiotherapy services sponsor patients to receive radiotherapy abroad. They often engage professionals for a feasibility study in order to establish whether it would be more cost-beneficial to establish a radiotherapy facility. Countries where radiotherapy services have developed without any central planning, find themselves in situations where many of the available centers are private and thus inaccessible for a majority of patients with limited resources. Government may decide to plan ahead when a significant exodus of cancer patients travel to another country for treatment, thus exposing the failure of the country to provide this medical service for its citizens. In developed countries, the trigger has been the existence of highly visible waiting lists for radiotherapy revealing a shortage of radiotherapy equipment. This paper suggests that there should be a systematic and comprehensive process of long-term planning of radiotherapy services at the national level, taking into account the regulatory infrastructure for radiation protection, planning of centers, equipment, staff, education programs, quality assurance, and sustainability aspects. Realistic budgetary and cost considerations must also be part of the project proposal or business plan. PMID:25505730

  8. National Highway Planning Network

    Energy Science and Technology Software Center (ESTSC)

    1992-02-02

    NHPN, the National Highway Planning Network, is a database of major highways in the continental United States that is used for national-level analyses of highway transportation issues that require use of a network, such as studies of highway performance, network design, social and environmental impacts of transportation, vehicle routing and scheduling, and mapping. The network is based on a set of roadways digitized by the U. S. Geological Survey (USGS) from the 1980 National Atlasmore » and has been enhanced with additional roads, attribute detail, and topological error corrections to produce a true analytic network. All data have been derived from or checked against information obtained from state and Federal governmental agencies. Two files comprise this network: one describing links and the other nodes. This release, NHPN1.0, contains 44,960 links and 28,512 nodes representing approximately 380,000 miles of roadway.« less

  9. US National Committee for the International Year of the Planet Earth: Plans and Activities

    NASA Astrophysics Data System (ADS)

    Hess, J. W.

    2007-12-01

    The International Year of the Planet Earth, as proclaimed by Resolution 60/192 of the United Nations General Assembly at its 60th Session, is a 3-year event (2007-2009) aimed at promoting the contribution to sustainable development of society by using geoscience knowledge and information. It is a joint initiative by the International Union of Geological Sciences (IUGS and UNESCO. The US National Committee (USNC) for the International Year of the Planet Earth is responsible for developing national science and outreach activities that contribute to the success of the global awareness on the use of geosociety for society. The USNC plans for a launch activity early in 2008 and a national outreach activity in the fall. Various US based geoscience societies and federal agencies will be conducting IYPE branded activities in support of the year.

  10. Ionospheric Response to Geomagnetic Activity during 2007-2009 Solar Minimum

    NASA Astrophysics Data System (ADS)

    Chen, Yiding; Liu, Libo; Huijun Le, lake709.; Wan, Weixing

    The significant effect of weaker geomagnetic activity on ionospheric day-to-day variability during 2007-2009 solar minimum was highlighted by investigating the response of global electron content (GEC) to geomagnetic activity index Ap. A case distinctly manifests the modulation of recurrent weaker geomagnetic disturbance on GEC during the solar minimum. Statistical analyses indicate that the effect of weaker geomagnetic activity on GEC day-to-day variability is significant during 2007-2009, even under relatively quiet geomagnetic activity condition, while geomagnetic activity effect on GEC is not prominent during 2003-2005 solar cycle descending phase except under strong geomagnetic disturbance condition. Nevertheless, statistically the most important effect on GEC day-to-day variability during 2007-2009 comes from the factors other than geomagnetic activity and solar EUV irradiance.

  11. Ionospheric Response to Geomagnetic Activity during 2007-2009 Solar Minimum

    NASA Astrophysics Data System (ADS)

    Chen, Yiding; Liu, Libo; Le, Huijun; Wan, Weixing

    2014-05-01

    The significant effect of weaker geomagnetic activity on ionospheric day-to-day variability during 2007-2009 solar minimum was highlighted by investigating the response of global electron content (GEC) to geomagnetic activity index Ap. A case distinctly manifests the modulation of recurrent weaker geomagnetic disturbance on GEC during the solar minimum. Statistical analyses indicate that the effect of weaker geomagnetic activity on GEC day-to-day variability is significant during 2007-2009, even under relatively quiet geomagnetic activity condition, while geomagnetic activity effect on GEC is not prominent during 2003-2005 solar cycle descending phase except under strong geomagnetic disturbance condition. Nevertheless, statistically the most important effect on GEC day-to-day variability during 2007-2009 comes from the factors other than geomagnetic activity and solar EUV irradiance.

  12. National transuranic program plan

    SciTech Connect

    Not Available

    1994-10-11

    As a result of various program initiatives, the U.S. generated and will continue to generate waste contaminated with radioactive materials. Because of increased awareness of the risks and special requirements to safely manage long-lived alpha-emitting radionuclides, a new category of radioactive waste, transuranic (TRU) waste, was adopted in 1970. Heads of Field Elements can determine that other alpha-contaminated wastes, peculiar to a specific site, must be managed as transuranic waste{close_quotes}. TRU waste is generated and stored at various DOE sites around the country. In December 1993, the National Transuranic Program Office (NTPO) was established as part of the Carlsbad Area Office (CAO) to integrate and coordinate the diverse organizational elements that contribute to the complex-wide management of TRU waste. Numerous sites with small TRU waste inventories are also part of the national TRU waste system. The majority of TRU waste is also contaminated with hazardous materials and is thus considered mixed waste. Mixed waste must be managed in compliance with all federal, state, and local regulations that are applicable to the radioactive and/or hazardous component of the waste. Each generator site is responsible for the management of its respective waste. Sites must plan and implement programs to minimize, characterize, package, treat, store, ship, and dispose of all TRU waste; construct required waste management facilities and equipment; obtain permits; perform site-specific National Environmental Policy Act (NEPA) analyses; conduct environmental studies; perform laboratory analyses; and certify that waste meets appropriate disposal facility criteria. Due to the toxicity and long half-lives of TRU radionuclides, TRU waste must be disposed in a manner that offers greater confinement than shallow land burial.

  13. North Dakota Department of Public Instruction 2007-2009 Biennial Report

    ERIC Educational Resources Information Center

    North Dakota Department of Public Instruction, 2009

    2009-01-01

    The Biennial Report presents a summary of programs and services provided by the North Dakota Department of Public Instruction for 2007-2009. The State Superintendent notes that while North Dakota's education system is good, slippage in test scores is occurring, cracks in the education system are developing and some students are falling through…

  14. Geomagnetic activity effect on the global ionosphere during the 2007-2009 deep solar minimum

    NASA Astrophysics Data System (ADS)

    Chen, Yiding; Liu, Libo; Le, Huijun; Wan, Weixing

    2014-05-01

    In this paper the significant effect of weaker geomagnetic activity during the 2007-2009 deep solar minimum on ionospheric variability on the shorter-term time scales of several days was highlighted via investigating the response of daily mean global electron content (GEC, the global area integral of total electron content derived from ground-based GPS measurements) to geomagnetic activity index Ap. Based on a case during the deep solar minimum, the effect of the recurrent weaker geomagnetic disturbances on the ionosphere was evident. Statistical analyses indicate that the effect of weaker geomagnetic activity on GEC variations on shorter-term time scales was significant during 2007-2009 even under relatively quiet geomagnetic activity condition; daily mean GEC was positively correlated with geomagnetic activity. However, GEC variations on shorter-term time scales were poorly correlated with geomagnetic activity during the solar cycle descending phase of 2003-2005 except under strong geomagnetic disturbance condition. Statistically, the effects of solar EUV irradiance, geomagnetic activity, and other factors (e.g., meteorological sources) on GEC variations on shorter-term time scales were basically equivalent during the 2007-2009 solar minimum.

  15. National Ignition Facility: Experimental plan

    SciTech Connect

    Not Available

    1994-05-01

    As part of the Conceptual Design Report (CDR) for the National Ignition Facility (NIF), scientists from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), the University of Rochester`s Laboratory for Laser Energetics (UR/LLE), and EG&G formed an NIF Target Diagnostics Working Group. The purpose of the Target Diagnostics Working Group is to prepare conceptual designs of target diagnostics for inclusion in the facility CDR and to determine how these specifications impact the CDR. To accomplish this, a subgroup has directed its efforts at constructing an approximate experimental plan for the ignition campaign of the NIF CDR. The results of this effort are contained in this document, the Experimental Plan for achieving fusion ignition in the NIF. This group initially concentrated on the flow-down requirements of the experimental campaign leading to ignition, which will dominate the initial efforts of the NIF. It is envisaged, however, that before ignition, there will be parallel campaigns supporting weapons physics, weapons effects, and other research. This plan was developed by analyzing the sequence of activities required to finally fire the laser at the level of power and precision necessary to achieve the conditions of an ignition hohlraum target, and to then use our experience in activating and running Nova experiments to estimate the rate of completing these activities.

  16. Nutrition and national development planning.

    PubMed

    Joy, J L; Payne, P R

    1975-01-01

    We have argued that development strategies aimed at the reduction of all forms of deprivation, according to an explict statement of values and priorities, are necessary for the integration of nutrition planning into overall national development planning. We do not regard this as likely to lead to the neglect of the key issues of investment and production. Instead, we argue that consideration of investment and production strategies should be explicitly directed to their purpose, the reduction of deprivation, rather than, as in the past, treated as the necessary means to that purpose. Thus investment and production strategies would be aimed directly at relieving deprivation including, especially, nutritional deprivation, and their impact in this respect will need to be explicitly predicted and evaluated. We have argued that problems and potentials differ greatly at the area level and that planning must be an iterative process in which national and area-level strategies and programmes are brought to consistency through successive cycles of adjustment and reappraisal. A major role in planning, especially in detailed design and implementation, is assigned to area level. Planning must proceed from an identification of the deprivations under attack to the identification of intervention measures. Elsewhere we have argued the case for the 'functional classification" of malnutrition and the use of "typical profiles" in the understanding of "the ecology and etiology of malnutition". Where planning accepts the need for an integrated approach to the attack on all forms of deprivation, these analyses of nutritional deprivation would from part of a more comprehensive analysis of general deprivation. The existence of "functional classification" and "typical profiles" analysis with respect to malnutrition would provide an excellent base from which a more comprehensive view might be developed. The factors affecting the evolution of nutritional - and other - deprivation problems need

  17. Temporal and spatial distribution of glacial earthquakes in Greenland during the IPY 2007-2009

    NASA Astrophysics Data System (ADS)

    Kozlovskaya, E.

    2012-04-01

    Glacial earthquakes are seismic events associated with rapid changes in the dynamics of ice sheets and glaciers. Monitoring of such events from Greenland at gerional distances was one of the major targets of the POLENET/LAPNET passive seismic experiment in northern Fennoscandia (northern parts of Finland, Sweden, Norway and Russian Karelia) during the IPY 2007-2009. The POLENET/LAPNET array, with the average spacing between stations of 70 km, recorded high-frequency continuous data of 37 temporary stations, which were in operation during the time frame from 01.05.2008 to 31.09.2009, and of 21 stations of selected permanent networks in the Fennoscandia. Glacial events from Greenland were identified using manual analysis of the continuous POLENET/LAPNET data. Recordings of glacial earthquakes by the array contain the long-period energy only. In many cases the events were recorded in groups within the time interval of up to 1 hour. For some of the events it was possible to recognize not only the long-period surface wave, but also the first arrival of a long-period P-wave. The events were located using standard array techniques. Our study proves that glacial earthquakes show a strong seasonality, with most of events occurring during summer months. We found out that during Summer, 2008, significant number of events originated from the northern part of Greenland, where recent investigation using GRACE data (Chen et al., 2011) showed rapid increase of ice loss rate. This

  18. National Foreign Language Planning: Practices and Prospects.

    ERIC Educational Resources Information Center

    Sajavaara, Kari, Ed.; And Others

    A selection of essays on foreign language planning at the national level contains articles on the language planning process, language choice, teacher education, testing and assessment, and transnational planning. Essays include the following: "Foreign Language Teaching Policy: Some Planning Issues" (Theo J. M. van Els); "Foreign Language Planning…

  19. High arctic snow avalanche observations and modeling in Svalbard 2007-2009

    NASA Astrophysics Data System (ADS)

    Eckerstorfer, Markus; Christiansen, Hanne H.; Humlum, Ole

    2010-05-01

    Systematic snow avalanche observations, carried out by the Norklima CRYOSLOPE Svalbard research project 2007-2009, represent the first comprehensive study of periglacial slope processes and especially snow avalanches in a high arctic maritime landscape. The main focus is on snow avalanche types, their spatial distribution, timing and associated controlling meteorological and snow pack conditions. Another focus is on the classification of the snow pack in central Svalbard in terms of thickness, hardness, stratigraphy and most persistent weak layers that cause avalanching. As a result of increasing population and tourism, snow mobile transportation and other recreational use of the steep terrain has increased, especially during the last 10-15 years in Svalbard. Such winter activity takes place in a high relief, almost vegetation free landscape, affected by snow avalanches. We present results from the 3 years project period, as well as the methods used to collect observations on snow avalanches, the snow pack and the meteorological data along the most intensively used 70 km snow mobile tracks around Svalbard's main settlement Longyearbyen. This enables us to identify the main factors controlling snow avalanches. We have recorded the amount of traffic along the main snow mobile tracks in our snow avalanche affected study area by use of radar, for avalanche risk evaluation. We also exemplify the high arctic maritime snow climate as an important additional type of snow climate, and emphasize its characteristics. Along with the field work, numerical modeling of avalanche activity has been developed and tested during the winter 2008-2009, on a weekly basis. The modeling includes topography, geomorphology and vegetation as input data, along with daily meteorological observations on air temperature, wind, cloud cover and precipitation from two meteorological stations at different altitudes. Examples from this modeling experiment will be presented together with the collected

  20. 75 FR 57820 - National Credit Union Administration Restoration Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... ADMINISTRATION National Credit Union Administration Restoration Plan AGENCY: National Credit Union Administration (NCUA). ACTION: Approval of National Credit Union Administration restoration plan. On September 16, 2010, the National Credit Union Administration (NCUA) implemented a Restoration Plan for the National...

  1. Web 2.0 and Its Use in Higher Education from 2007-2009: A Review of Literature

    ERIC Educational Resources Information Center

    Liu, Min; Kalk, Debby; Kinney, Lance; Orr, Gregg

    2012-01-01

    This paper is a review of literature on Web 2.0 uses in higher education from 2007-2009. The goals of this review were (1) to identify what Web 2.0 technologies were used in college level instruction, and (2) to examine any research evidence that Web 2.0 technologies could enhance teaching and learning. Conference proceedings from 2007 to 2009…

  2. National Strategic Research Plan 1991, 1992, 1993.

    ERIC Educational Resources Information Center

    National Inst. on Deafness and Other Communications Disorders, Bethesda, MD.

    This report updates the National Strategic Research Plan of the National Institute on Deafness and Other Communication Disorders (NIDCD) and reports progress made from 1991 through 1993 as required by the National Deafness and Other Communication Disorders Act of 1988 (Public Law 100-553) which established the Institute. An executive summary…

  3. National Security Technology Incubation Project Continuation Plan

    SciTech Connect

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  4. National Security Technology Incubator Action Plan

    SciTech Connect

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  5. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    SciTech Connect

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  6. Petersburg National Battlefield Lesson Plans.

    ERIC Educational Resources Information Center

    National Park Service (Dept. of Interior), Washington, DC.

    This collection of eight lesson plans deals with the Petersburg (Virginia) U.S. Civil War battlefield. The lessons tell about slave life and plantation life in the U.S. south, and how the Civil War forever changed this structure. To do the lessons, students read primary source documents that tell the stories of three different soldiers who…

  7. Maintaining technical excellence requires a national plan

    NASA Technical Reports Server (NTRS)

    Davidson, T. F.

    1991-01-01

    To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.

  8. National Security Technology Incubator Operations Plan

    SciTech Connect

    2008-04-30

    This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

  9. Connecting America: The National Broadband Plan

    ERIC Educational Resources Information Center

    Federal Communications Commission, 2010

    2010-01-01

    In early 2009, Congress directed the Federal Communications Commission (FCC) to develop a National Broadband Plan to ensure every American has "access to broadband capability." Congress also required that this plan include a detailed strategy for achieving affordability and maximizing use of broadband to advance "consumer welfare, civic…

  10. National Mirror Fusion Program Plan

    SciTech Connect

    Gerich, C.A.

    1982-08-01

    This Plan is current as of August 1982. The major milestones listed herein represent an aggressive, success-oriented program paced primarily by technical results. Consistent with applicable government policies and the overall program planning of the Department's Office of Fusion Energy, this Plan assumes approval of the Mirror Program's next major step beyond MFTF-B - a deuterium-tritium (D-T) burning engineering reactor called the Fusion Power Demonstration (FPD) facility (formerly the Tandem Mirror Next Step). The near-term goal of the tandem mirror program is to lay the scientific and technical groundwork for an economically attractive, D-T fusion reactor design before the end of the 1980s. Construction of the FPD facility based on the tandem mirror could be initited around 1988. A second phase, complete with a nuclear power blanket demonstration, could be initiated in the mid-1990s, based on nuclear engineering data from a facility such as the Technology Demonstration Facility (TDF) described below. The outline of an acceptable tandem mirror reactor (TMR) design was first published in 1981, and will be further developed and described in the Mirror Advanced Reactor Study (MARS) during FY 1982-1983.

  11. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  12. National energy planning for developing countries

    SciTech Connect

    Wilbanks, T.J.

    1986-01-01

    This paper is a summary of what has been learned from the experience with national energy planning in developing countries. It considers lessons learned about the roles of data, analysis, and modeling in this enterprise, because of the connections between these components and our common interest in research to advance the state of the art; but it concludes that the most important needs at this time are institutional rather than analytical, which suggests a somewhat different set of priorities for scholarship related to national energy planning in the developing world.

  13. Jamaica Integrated National Energy Planning Model

    SciTech Connect

    Macal, C.M.

    1987-01-01

    The Jamaica Integrated National Energy Planning (JINEP) Model was developed by Argonne National Laboratory under contract to the Jamaica Ministry of Mining, Energy, and Tourism. JINEP is a comprehensive model of the energy-producing sector and the major energy consuming sectors of Jamaica. The JINEP Model is an application of a modelling system, the Integrated Demand and Energy Supply (IDES) Model, that was previously developed at Argonne for the purpose of analyzing energy systems of developing countries. IDES is based on several years of experience in analyzing energy planning issues characteristic of developing countries.

  14. National Ignition Facility project acquisition plan

    SciTech Connect

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  15. National Ignition Facility wet weather construction plan

    SciTech Connect

    Kugler, A N

    1998-01-01

    This report presents a wet weather construction plan for the National Ignition Facility (NIF) construction project. Construction of the NIF commenced in mid- 1997, and excavation of the site was completed in the fall. Preparations for placing concrete foundations began in the fall, and above normal rainfall is expected over the tinter. Heavy rainfall in late November impacted foundation construction, and a wet weather construction plan was determined to be needed. This wet weather constiction plan recommends a strategy, techniques and management practices to prepare and protect the site corn wet weather effects and allow construction work to proceed. It is intended that information in this plan be incorporated in the Stormwater Pollution Prevention Plan (SWPPP) as warranted.

  16. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Jenifer Nordstrom

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  17. National Biofuels Action Plan, October 2008

    SciTech Connect

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  18. The role of fish movements and the spread of infectious salmon anemia virus (ISAV) in Chile, 2007-2009.

    PubMed

    Mardones, F O; Martinez-Lopez, B; Valdes-Donoso, P; Carpenter, T E; Perez, A M

    2014-04-01

    Infectious salmon anemia virus (ISAV) infection is a constant major threat to farmed and wild Atlantic salmon worldwide. Many epidemics have recently been reported in the most important salmon farming regions of the world, including Chile (2007-2009), where ISAV generated the most important disease and economic crisis in history of the salmon industry of the country. The spread of ISAV within a region is most likely by local or neighborhood spread from an infected farm; however, there is evidence that anthropogenic activities, such as movement of live or harvested fish or their byproduct, may have played a more important role than environmental or passive transmission in the 2007-2009 outbreak. Atlantic salmon farms (n=421) were retrospectively followed from stocking to harvesting in southern Chile at the time of the ISAV epidemic (2007-2009). The effect of husbandry and spatial risk factors, in addition to contact-network risk factors, which were obtained from the social network analyses, on time to first ISAV infection was estimated using a multivariable Cox proportional hazards model. Five variables were retained in the final fitted model: co-existing multiple generations on a farm (hazard ratio [HR]=2.585), mean smolt weight at stocking greater than 120g (HR=1.165), farm area (perkm(2)) (HR=1.005), and increased number of shipments entering a farm, i.e. the farm input degree (HR=1.876) were associated with reduced time to infection; whereas time-to-infection was longer for farms located farther from an ongoing ISAV outbreak (HR=0.943). It was demonstrated that movements of latently infected fish resulted in approximately 7 outbreaks, and potentially explain about 6% of the total number of cases during the epidemic. Results from this study provide new information about the mechanisms of spread of ISAV in one the largest documented ISAV epidemics in the world. Findings may be used to support the design and implementation of risk-based surveillance and control

  19. 76 FR 15791 - National Poultry Improvement Plan and Auxiliary Provisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ...We are amending the National Poultry Improvement Plan (the Plan) and its auxiliary provisions by providing new or modified sampling and testing procedures for Plan participants and participating flocks. The changes were voted on and approved by the voting delegates at the Plan's 2008 National Plan Conference. These changes will keep the provisions of the Plan current with changes in the......

  20. Description of the National Highway Planning Network

    SciTech Connect

    Peterson, B.E.

    1990-09-01

    The National Highway Planning Network is a data base of major highways in the continental United States. It is a foundation for analytic studies of highway performance, for vehicle routing and scheduling problems, and for mapping purposes. The network is based on a set of roadways digitized from the National Atlas by the US Geological Survey. It has been enhanced at Oak Ridge National Laboratory by adding additional roads and attribute detail and correcting topological errors to produce a true analytic network. This documentation is intended primarily to assist users of this data base by describing its structure, data elements, and development.

  1. A National Periodicals Center Technical Development Plan.

    ERIC Educational Resources Information Center

    Council on Library Resources, Inc., Washington, DC.

    This technical plan for developing, managing, and operating a national periodicals center (NPC), which was prepared at the request of the Library of Congress, is designed so that it could be used by the Library or any other agency prepared to assume responsibility for the creation of a major periodicals facility. The overall goal of the NPC is to…

  2. National Ignition Facility Title II Design Plan

    SciTech Connect

    Kumpan, S

    1997-03-01

    This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

  3. National Security Technology Incubator Business Plan

    SciTech Connect

    2007-12-31

    This document contains a business plan for the National Security Technology Incubator (NSTI), developed as part of the National Security Preparedness Project (NSPP) and performed under a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This business plan describes key features of the NSTI, including the vision and mission, organizational structure and staffing, services, evaluation criteria, marketing strategies, client processes, a budget, incubator evaluation criteria, and a development schedule. The purpose of the NSPP is to promote national security technologies through business incubation, technology demonstration and validation, and workforce development. The NSTI will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The vision of the NSTI is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety, security, and protection of the homeland. The NSTI is operated and managed by the Arrowhead Center, responsible for leading the economic development mission of New Mexico State University (NMSU). The Arrowhead Center will recruit business with applications for national security technologies recruited for the NSTI program. The Arrowhead Center and its strategic partners will provide business incubation services, including hands-on mentoring in general business matters, marketing, proposal writing, management, accounting, and finance. Additionally, networking opportunities and technology development assistance will be provided.

  4. Fourth National Development Plan 1989-1993.

    PubMed

    1989-01-01

    This document contains major provisions of chapters 6 and 20 of Zambia's Fourth National Development Plan (1989-93). Chapter 6 deals with the interrelationship between population and development. The high rate of population growth has placed enormous pressure on the country's educational system, health sector, and employment and has led to increased rural-urban migration and urbanization. The rate of population growth has outstripped the ability of the country to produce enough food for self-sufficiency. Thus, population dynamics are being considered as part of the national development process for the first time in this development plan, and a national population policy has been adopted. The objectives of the population policy are to slow population growth, to improve maternal-child health, to integrate population into the development planning process, to strengthen institutions involved in population activities, to establish a National Population Council, to strengthen the population data base, to extend family planning (FP) coverage to all adults, to reduce total fertility from 7.2 to 4, and to reduce infant mortality from 97/1000 to 75/1000. The strategies to implement the policy include population education measures, upgrading and expanding FP programs, expanding primary health care and maternal-child health (MCH) programs, and providing human resource training in appropriate fields. The institutional framework to implement these goals and strategies exists in Zambia, and various programs will be coordinated by a newly created National Population Council. Chapter 20 of the development plan covers health issues and specifies measures to improve MCH care, and FP services. Specific FP targets include increasing the number of FP acceptors from 15 to 50% by the end of 1993. PMID:12344448

  5. National Security Technology Incubation Strategic Plan

    SciTech Connect

    2007-01-01

    This strategic plan contains information on the vision, mission, business and technology environment, goals, objectives, and incubation process of the National Security Technology Incubation Program (NSTI) at Arrowhead Center. The development of the NSTI is a key goal of the National Security Preparedness Project (NSPP). Objectives to achieve this goal include developing incubator plans (strategic, business, action, and operations), creating an incubator environment, creating a support and mentor network for companies in the incubator program, attracting security technology businesses to the region, encouraging existing business to expand, initiating business start-ups, evaluating products and processes of the incubator program, and achieving sustainability of the incubator program. With the events of 9/11, the global community faces ever increasing and emerging threats from hostile groups determined to rule by terror. According to the National Nuclear Security Administration (NNSA) Strategic Plan, the United States must be able to quickly respond and adapt to unanticipated situations as they relate to protection of our homeland and national security. Technology plays a key role in a strong national security position, and the private business community, along with the national laboratories, academia, defense and homeland security organizations, provide this technology. Fostering innovative ideas, translated into relevant technologies answering the needs of NNSA, is the purpose of the NSTI. Arrowhead Center of New Mexico State University is the operator and manager of the NSTI. To develop the NSTI, Arrowhead Center must meet the planning, development, execution, evaluation, and sustainability activities for the program and identify and incubate new technologies to assist the NNSA in meeting its mission and goals. Technology alone does not give a competitive advantage to the country, but the creativity and speed with which it is employed does. For a company to

  6. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  7. Idaho National Laboratory Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  8. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  9. National NIF Diagnostic Program Interim Management Plan

    SciTech Connect

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  10. Safety basis academy summary of project implementation from 2007-2009

    SciTech Connect

    Johnston, Julie A

    2009-01-01

    During fiscal years 2007 through 2009, in accordance with Performance Based Incentives with DOE/NNSA Los Alamos Site Office, Los Alamos National Security (LANS) implemented and operated a Safety Basis Academy (SBA) to facilitate uniformity in technical qualifications of safety basis professionals across the nuclear weapons complex. The implementation phase of the Safety Basis Academy required development, delivery, and finalizing a set of 23 courses. The courses developed are capable of supporting qualification efforts for both federal and contractor personnel throughout the DOE/NNSA Complex. The LANS Associate Director for Nuclear and High Hazard Operations (AD-NHHO) delegated project responsibillity to the Safety Basis Division. The project was assigned to the Safety Basis Technical Services (SB-TS) Group at Los Alamos National Laboratory (LANL). The main tasks were project needs analysis, design, development, implementation of instructional delivery, and evaluation of SBA courses. DOE/NNSA responsibility for oversight of the SBA project was assigned to the Chief of Defense for Nuclear Safety, and delegated to the Authorization Basis Senior Advisor, Continuous Learning Chair (CDNS-ABSA/CLC). NNSA developed a memorandum of agreement with LANS AD-NHHO. Through a memorandum of agreement initiated by NNSA, the DOE National Training Center (NTC) will maintain the set of Safety Basis Academy courses and is able to facilitate course delivery throughout the DOE Complex.

  11. National solid waste management plan for Iraq.

    PubMed

    Knowles, James A

    2009-06-01

    After decades of turmoil and international sanctions much of the key civil infrastructure within Iraq has fallen into disrepair, leading to a considerable decline in the provision of basic and essential municipal services. This is particularly true of waste and resource management services that have seen years of underdevelopment and deterioration. This has resulted in a lack of provision of basic public services in the waste sector which have been replaced by a burgeoning unregulated informal market in waste collection, disposal and recycling. In response, a National Solid Waste Management Plan (NSWMP) for Iraq was developed in 2007, to plan for the strategic development of all aspects of waste management in the country over the coming 20 years. In particular, the NSWMP focuses on policy development and integrated planning regarding regulatory framework, economic aspects, institutional capacity, citizen and technical education, and technical and operational development. This paper summarizes the key objectives, challenges and subsequent recommendations contained in the NSWMP for Iraq. PMID:19470543

  12. National conference on integrated resource planning: Proceedings

    SciTech Connect

    Not Available

    1991-12-31

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  13. National Conference on Integrated Resource Planning: Proceedings

    NASA Astrophysics Data System (ADS)

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; and key regulatory issues facing gas utilities during the next five years.

  14. National conference on integrated resource planning: Proceedings

    SciTech Connect

    Not Available

    1991-01-01

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  15. International Year of Planet Earth Cooperating with Other Years in 2007-2009

    NASA Astrophysics Data System (ADS)

    de Mulder, E. F.

    2006-05-01

    After its inception in 2001, the International Year of Planet Earth was proclaimed for 2008 by the UN General Assembly in December 2005. The UN Year will be in the core of a triennium, starting in January 2007 and closing by the end of 2009. Through UN proclamation, it has gained the political support by 191 UN nations. The International Year of Planet Earth was initiated by the International Union of Geological Sciences (IUGS) finding UNESCO's Earth Sciences Division ready as co-initiator. It enjoys the backing of all relevant IUGS's sister unions in ICSU, including IUGG, IGU, IUSS, ISPRS and INQUA among its 12 Founding Partners and AGI, AAPG and AIPG as major USA based international geoscientific organizations. Moreover, the initiative is supported by 26 more geoscientific and other relevant bodies. The aim of the Year, encapsulated in its subtitle Earth sciences for Society, is to build awareness of the relationship between humankind and Planet Earth, and to demonstrate that geoscientists are key players in creating a balanced, sustainable future for both. In this respect it aims to convince politicians to apply the wealth of geodata and information in day-to-day policy making. The International Year includes a Science and an Outreach Programme, both of equal financial size. The ten Science Themes (Groundwater, Hazards, Health, Climate, Resources, Deep Earth, Ocean, Megacities, Soils, and Life) in the Science Programme were selected for their societal impact, their potential for outreach, as well as their multidisciplinary nature and high scientific potential. Brochures with key questions and invitations for scientists to submit project proposals have been printed for each Theme and can be downloaded from www.yearofplanetearth.org. The same bottom-up mode is applied for the Outreach Programme which will operate as a funding body, receiving bids for financial support - for anything from web-based educational resources to commissioning works of art that will help

  16. The Italian Dementia National Plan. Commentary.

    PubMed

    Di Fiandra, Teresa; Canevelli, Marco; Di Pucchio, Alessandra; Vanacore, Nicola

    2015-01-01

    The Italian Dementia National Plan was formulated in October 2014 by the Italian Ministry of Health in close cooperation with the regions, the National Institute of Health and the three major national associations of patients and carers. The main purpose of this strategy was to provide directive indications for promoting and improving interventions in the dementia field, not limiting to specialist and therapeutic actions, but particularly focusing on the support of patients and families throughout the pathways of care. Four main objectives are indicated: 1) promote health- and social-care interventions and policies; 2) create/strengthen the integrated network of services for dementia based on an integrated approach; 3) implement strategies for promoting appropriateness and quality of care; and 4) improve the quality of life of persons with dementia and their families by supporting empowerment and stigma reduction. These objectives and the pertaining actions are described in the present paper. PMID:26783209

  17. National Ignition Facility project acquisition plan revision 1

    SciTech Connect

    Clobes, A.R.

    1996-10-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  18. Relationship between Frequency and Intensity of Cigarette Smoking and TTFC/C among Students of the GYTS in Select Countries, 2007-2009

    ERIC Educational Resources Information Center

    Lam, Eugene; Giovino, Gary A.; Shin, Mikyong; Lee, Kyung A.; Rolle, Italia; Asma, Samira

    2014-01-01

    Background: This study assessed the construct validity of a measure of nicotine dependence that was used in the Global Youth Tobacco Survey (GYTS). Methods: Using 2007-2009 data from the GYTS, subjects from 6 countries were used to assess current smokers' odds of reporting time to first cigarette or craving positive (TTFC/C+) by the number of…

  19. Telavancin activity tested against a contemporary collection of Gram-positive pathogens from USA Hospitals (2007-2009).

    PubMed

    Mendes, Rodrigo E; Sader, Helio S; Farrell, David J; Jones, Ronald N

    2012-01-01

    This study updates the activity of telavancin against Gram-positive pathogens collected from USA hospitals (2007-2009). Telavancin (MIC(50/90), 0.12/0.25 μg/mL) was active against coagulase-negative staphylococci and methicillin-resistant Staphylococcus aureus (100% susceptible), for which only daptomycin (MIC(50/90), 0.25/0.5 μg/mL; 99% susceptible) and quinupristin/dalfopristin (MIC(50/90), ≤ 0.25-0.5/0.5 μg/mL; 99% susceptible) exhibited similar activity. Telavancin (MIC(50/90), 0.25/0.5 μg/mL) inhibited 96.5% of Enterococcus faecalis at the Food and Drug Administration breakpoint (MIC, ≤ 1 μg/mL), where ampicillin (99.9% susceptible), daptomycin (99.9% susceptible), and linezolid (100% susceptible) also demonstrated high-level coverage. Telavancin inhibited, respectively, 100.0% and 91.7% of VanB-phenotype E. faecalis and E. faecium at ≤ 1 μg/mL, whereas it was less active against VanA strains. Telavancin was uniformly active against Streptococcus pneumoniae and resistant subsets, and demonstrated good potency (MIC(90), 0.06-0.12 μg/mL) against other streptococci, regardless of resistance to other drugs. This assessment reveals potent activity of telavancin against Gram-positive isolates collected from USA hospitals with no evidence of emergence of resistance. PMID:22078909

  20. The features of sporadic hyperbolic meteors observed by television techniques in the period of 2007-2009

    NASA Astrophysics Data System (ADS)

    Guliyev, Ayyub; Nabiyev, Shaig

    2015-12-01

    The features of 238 hyperbolic meteors observed within the framework of the Japanese program SonotaCo in the period of 2007-2009 are investigated in this paper. Irregularity of the eccentricities, explicitly dominance of retrograde orbits over direct ones, absence of domination of perihelia closes the ecliptic, irregular distribution of angular elements for these bodies' orbits were noticed. The values of eccentricities are distributed in the interval from 1 up to 1.31. The significant concentration of these particles perihelia closes the anti-apex of the Sun's peculiarity movements in the Galaxy was noticed. Distribution of elements of orbits in the galactic system of coordinates was considered also, however it was not possible to find the appreciable regularities. The distributions of the distant nodes and MOID-Minimum Orbit Intersection Distance of the hyperbolic meteors relatively to the orbits of the planets-giants were investigated as well. However it was not possible to prove, that the majority of the particles could receive the hyperbolic excess of speed due to the gravitational influence of the planets-giants. The statistics of relation of the hyperbolic meteors with 14 known trans-Neptunian planetary bodies brighter 3m.5 is considered. Testing of the distant nodes and MOID values only for 2003 MW12, 2007 OR10 and Qaoaor have the positive results. In the next stage we have made analogical calculations for the 78 TNO having absolute brightness 5m.5 also and obtained the reasonable results for 9 of them.

  1. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Public Safety National Plan. 90.16 Section 90... PRIVATE LAND MOBILE RADIO SERVICES Public Safety Radio Pool § 90.16 Public Safety National Plan. The Commission has established a National Plan which specifies special policies and procedures governing...

  2. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    SciTech Connect

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  3. Quinault Indian Nation Renewable Energy Plan

    SciTech Connect

    Don Hopps, Institute for Washington's Future; Jesse Nelson, Institute for Washington's Future

    2006-11-28

    The Quinault Indian Nation (Nation) initiated this study on conservation and production of renewable energy because this approach created the opportunity: • To become self-sufficient and gain greater control over the energy the Nation uses; • To generate jobs and businesses for its members; • To better manage, sustain, and protect its resources; • To express the cultural values of the Nation in an important new arena. The Nation has relatively small energy needs. These needs are concentrated at two separate points: the Quinault Beach Resort and Casino (QBRC) and Taholah on the Quinault Indian Reservation (QIR). Except for the town of Queets, energy needs are small and scattered. The needs vary greatly over the season. The small scale, widely dispersed, and variable nature of these needs presents a unique challenge to the Nation. Meeting these needs requires a resource and technology that is flexible, effective, and portable. Conservation is the most cost-effective way to meet any need. It is especially effective in a situation like this where production would leave a high per unit cost. This plan is based on first gaining energy savings through conservation. Major savings are possible through: 1. Upgrading home appliances on the QIR. 2. Weatherizing homes and facilities. 3. Changes in lighting/ventilation in the QBRC pool room. These elements of the plan are already being implemented and promise to save the Nation around a quarter of its present costs. Wood biomass is the best resource available to the QIN for energy production either on-site or for commercial development. It is abundant, flexible and portable. Its harvesting has high job potential and these jobs are a good fit for the present “skill set” of the QIN. This plan focuses on using wood biomass to produce energy and other value-added products. Our study considered various technologies and approaches to using wood for energy. We considered production for both on-site and commercial production

  4. Magnetic Clouds at/near the 2007 - 2009 Solar Minimum: Frequency of Occurrence and Some Unusual Properties

    NASA Technical Reports Server (NTRS)

    Lepping. R. P.; Wu, C.-C.; Berdichevsky, D. B.; Szabo, A.

    2011-01-01

    Magnetic clouds (MCs) have been identified for the period 2007 2009 (at/near the recent solar minimum) from Wind data, then confirmed through MC parameter fitting using a force-free model. A dramatic increase in the frequency of occurrence of these events took place from the two early years of 2007 (with five MCs) and 2008 (one MC) compared to 2009 (12 MCs). This pattern approximately mirrors the occurrence-frequency profile that was observed over a three-year interval 12 years earlier, with eight events in 1995, four in 1996, and 17 in 1997, but decreased overall by a factor of 0.62 in number. However, the average estimated axial field strength taken over all of the 18 events of 2007 - 2009 (called the "recent period" here) was only 11.0 nT, whereas |BO| for the 29 events of 1995 - 1997 (called the "earlier period" ) was 16.5 nT. This 33% average drop in |BO| is more or less consistent with the decreased three-year average interplanetary magnetic field intensity between these two periods, which shows a 23% drop. In the earlier period, the MCs were clearly of mixed types but predominantly of the South-to-North type, whereas those in the recent period are almost exclusively the North-to-South type; this change is consistent with global solar field changes predicted by Bothmer and Rust (Geophys. Monogr. Ser. 99, 139, 1997). As we have argued in earlier work (Lepping and Wu, J. Geophys. Res. 112, A10103, 2007), this change should make it possible to carry out (accurate short-term) magnetic storm forecasting by predicting the latter part of an MC from the earlier part, using a good MC parameter-fitting model with real-time data from a spacecraft at L1, for example. The recent set s average duration is 15.2 hours, which is a 27% decrease compared to that of the earlier set, which had an average duration of 20.9 hours. In fact, all physical aspects of the recent MC set are shown to drop with respect to the earlier set; e.g., as well as the average internal magnetic field

  5. Glacial seismic events from Greenland recorded by the POLENET/LAPNET seismic array during the IPY 2007-2009

    NASA Astrophysics Data System (ADS)

    Kozlovskaya, E.

    2012-12-01

    Glacial earthquakes are seismic events associated with rapid changes in the dynamics of ice sheets and glaciers. They belong to the class of so-called slow earthquakes caused by a variety of stick-slip and creep processes. Recordings of glacial events are depleted in high frequencies and can be detected from recordings of broadband seismic instruments. Monitoring of such events from Greenland at regional distances was one of the major targets of the POLENET/LAPNET passive seismic experiment in northern Fennoscandia (northern parts of Finland, Sweden, Norway and Russian Karelia) during the IPY 2007-2009. The POLENET/LAPNET array, with the average spacing between stations of 70 km, recorded high-frequency continuous data of 37 temporary stations, which were in operation during the time frame from 01.05.2008 to 31.09.2009, and of 21 stations of selected permanent networks in the Fennoscandia. Glacial events from Greenland were identified using manual analysis of the continuous POLENET/LAPNET data filtered by a bandpass filter from 35 s to 140 s frequency band. The detected events were located using standard array techniques. Our study demonstrated that the POLENET/LAPNET array, located at regional distances from Greenland, recorded more such events than the Global Seismographic Network (GSN) during the same observation period. In addition, the array detected a number of slow earthquakes originating from northern part of Mid-Atlantic Ridge, Iceland, vicinity of Spitsbergen, Jan Mayen Island and a number of events originated from Arctic Canada. This shows that analysis of recordings of broadband stations in low-frequency can provide new information about seismicity and spreading processes in the Arctics. Our study proves that glacial earthquakes in Greenland show a seasonality, with most of events occurring during summer months. We found out that during 2008, significant number of events originated from the northern part of Greenland, where recent investigation using

  6. Large-scale monitoring and assessment of metal contamination in surface water of the Selenga River Basin (2007-2009).

    PubMed

    Nadmitov, Bulat; Hong, Seongjin; In Kang, Sang; Chu, Jang Min; Gomboev, Bair; Janchivdorj, Lunten; Lee, Chang-Hee; Khim, Jong Seong

    2015-02-01

    An extensive and year-round survey was conducted to assess metal pollution in vast watershed areas of the Selenga River Basin (2007-2009), which provided baseline heavy metal database for the future management. Sources and environmental hazard and risk indices associated with metal pollution were evidenced across the countries of Mongolia and Russia (Buryatia Republic). In general, the concentrations of heavy metals in river water of Mongolia were greater than those of Russia, expect for the upstream of the Dzhida River in Russia. The spatial distribution generally indicated that metal pollution in the Selenga River was mainly associated with the activities in the Mongolian upstream regions. Similar pollution sources of metals between river water and wastewater associated with surrounding activities were found across the industrial and mining areas. Compositional patterns of metals suggested their sources were independent of each other, with hot spots in certain sites. Our measurements indicated that about 63 % of the locations surveyed (48 of 76) exceeded the critical heavy metal pollution index of 100, identifying possible harmful effects on aquatic ecosystems through metal pollution. Zinc was found to be the chemical of priority concern, as more than half of the locations exceeded the corresponding water quality guideline. Other metals including Mn, Fe, Cr, Cu, and As might be problematic in the Selenga River Basin considering the occurrence and their concentrations. Results of our extensive survey during the period of 3 years indicated that urgent action would be necessary in timely manner to improve water quality and mitigate the impact of heavy metals on aquatic environment of the Selenga River Basin. PMID:25217283

  7. National volcanic ash operations plan for aviation

    USGS Publications Warehouse

    United States Department of Commerce; National Oceanic and Atmospheric Administration

    2007-01-01

    The National Aviation Weather Program Strategic Plan (1997) and the National Aviation Weather Initiatives (1999) both identified volcanic ash as a high-priority informational need to aviation services. The risk to aviation from airborne volcanic ash is known and includes degraded engine performance (including flameout), loss of visibility, failure of critical navigational and operational instruments, and, in the worse case, loss of life. The immediate costs for aircraft encountering a dense plume are potentially major—damages up to $80 million have occurred to a single aircraft. Aircraft encountering less dense volcanic ash clouds can incur longer-term costs due to increased maintenance of engines and external surfaces. The overall goal, as stated in the Initiatives, is to eliminate encounters with ash that could degrade the in-flight safety of aircrews and passengers and cause damage to the aircraft. This goal can be accomplished by improving the ability to detect, track, and forecast hazardous ash clouds and to provide adequate warnings to the aviation community on the present and future location of the cloud. To reach this goal, the National Aviation Weather Program established three objectives: (1) prevention of accidental encounters with hazardous clouds; (2) reduction of air traffic delays, diversions, or evasive actions when hazardous clouds are present; and (3) the development of a single, worldwide standard for exchange of information on airborne hazardous materials. To that end, over the last several years, based on numerous documents (including an OFCMsponsored comprehensive study on aviation training and an update of Aviation Weather Programs/Projects), user forums, and two International Conferences on Volcanic Ash and Aviation Safety (1992 and 2004), the Working Group for Volcanic Ash (WG/VA), under the OFCM-sponsored Committee for Aviation Services and Research, developed the National Volcanic Ash Operations Plan for Aviation and Support of the

  8. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  9. Idaho National Laboratory Site Pollution Prevention Plan

    SciTech Connect

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  10. Navajo Nation expands family planning services.

    PubMed

    Haws, J; Crawford, G

    1996-01-01

    An AVSC training program, conducted in cooperation with the Navajo Nation Family Planning Corporation (NNFPC), has the potential to profoundly affect sterilization provision and acceptability on the Navajo Nation reservation. AVSC trained a family physician from the Northern Navajo Medical Center (New Mexico) in the no-scalpel vasectomy technique. This physician expects to provide 30 such sterilizations in the one-year period following the training and is preparing to teach reservation physicians from other health centers to perform the procedure. In addition, a joint AVSC-NNFPC course on sterilization counseling was presented to 30 nursing staff from the New Mexico Center. Central to this training was consideration of the obstacles to sterilization acceptance posed by Navajo cultural beliefs. Sensitivity to some women's desire to keep the procedure private, due to concerns their husbands will abandon them if they can no longer bear children, and to the potential need to include mothers and grandmothers in counseling sessions, is required. Also salient for female counselors and nurses are cultural taboos against a woman discussing sexual matters with a man with whom she is not intimate. In late 1996, AVSC will provide a sterilization counseling update for all NNFPC counselors working at centers throughout the four-state reservation. PMID:12347635

  11. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  12. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  13. Regimes of Volcanic Activity at Mt. Etna in 2007-2009 inferred from Unsupervised Pattern Recognition on Volcanic Tremor Data

    NASA Astrophysics Data System (ADS)

    Falsaperla, S. M.; Behncke, B.; Langer, H. K.; Messina, A.; Spampinato, S.

    2009-12-01

    Mt Etna is a well monitored basaltic volcano for which high-quality, multidisciplinary data set are continuously available for around-the-clock surveillance. Particularly, volcano-seismic data sets cover decades long local recordings, temporally encompassing different styles of eruptive activity, from Strombolian eruptions to lava fountains and lava flows. Intense earthquakes swarms have often heralded effusive activity. However, from the seismic point of view, volcanic tremor has proved to be one of the most reliable indicators of impending eruptive activity. Indeed, changes in the volcano feeder show up in the signature of tremor, its spectral characteristics and source location. Some of us (Langer and Messina) have recently developed a new software for the classification of volcanic tremor data, combining Self Organizing Maps (also known as Kohonen Maps) along with Cluster and Fuzzy Analysis. This software allows us to analyse the background seismic radiation at permanent broadband stations located at various distance from the summit craters to identify transitions from pre-eruptive to eruptive activity. Throughout the analysis of the data flow, the software provides an unsupervised classification of the spectral characteristics (i.e., amplitude and frequency content) of the signal. The information embedded in the spectrum is interpreted to assign a specific state of the volcano. An application of this new software is proposed here on the eruptive events at Etna of 2007-2009, which consisted of 7 episodes of lava fountaining, periodic Strombolian activity at the summit craters, followed by lava emissions on the upper east flank of the volcano, with start on 13 May 2008 and end on 6 July 2009. In the study period the source of volcanic tremor was always shallow (less than 3 km) and within the volcano edifice. The upraise of magma to the surface was fast and associated with changes of volcanic tremor features, which covered time windows of variable duration from

  14. Deep Solar Activity Minimum 2007-2009: Solar Wind Properties and Major Effects on the Terrestrial Magnetosphere

    NASA Technical Reports Server (NTRS)

    Farrugia, C. J.; Harris, B.; Leitner, M.; Moestl, C.; Galvin, A. B.; Simunac, K. D. C.; Torbert, R. B.; Temmer, M. B.; Veronig, A. M.; Erkaev, N. V.; Szabo, A.; Ogilvie, K. W.; Luhman, J. G.; Osherovich, V. A.

    2012-01-01

    We discuss the temporal variations and frequency distributions of solar wind and interplanetary magnetic field parameters during the solar minimum of 2007 - 2009 from measurements returned by the IMPACT and PLASTIC instruments on STEREO-A.We find that the density and total field strength were significantly weaker than in the previous minimum. The Alfven Mach number was higher than typical. This reflects the weakness of magnetohydrodynamic (MHD) forces, and has a direct effect on the solar wind-magnetosphere interactions.We then discuss two major aspects that this weak solar activity had on the magnetosphere, using data from Wind and ground-based observations: i) the dayside contribution to the cross-polar cap potential (CPCP), and ii) the shapes of the magnetopause and bow shock. For i) we find a low interplanetary electric field of 1.3+/-0.9 mV/m and a CPCP of 37.3+/-20.2 kV. The auroral activity is closely correlated to the prevalent stream-stream interactions. We suggest that the Alfven wave trains in the fast streams and Kelvin-Helmholtz instability were the predominant agents mediating the transfer of solar wind momentum and energy to the magnetosphere during this three-year period. For ii) we determine 328 magnetopause and 271 bow shock crossings made by Geotail, Cluster 1, and the THEMIS B and C spacecraft during a three-month interval when the daily averages of the magnetic and kinetic energy densities attained their lowest value during the three years under survey.We use the same numerical approach as in Fairfield's empirical model and compare our findings with three magnetopause models. The stand-off distance of the subsolar magnetopause and bow shock were 11.8 R(sub E) and 14.35 R(sub E), respectively. When comparing with Fairfield's classic result, we find that the subsolar magnetosheath is thinner by approx. 1 R(sub E). This is mainly due to the low dynamic pressure which results in a sunward shift of the magnetopause. The magnetopause is more flared

  15. Deep Solar Activity Minimum 2007-2009: Solar Wind Properties and Major Effects on the Terrestrial Magnetosphere

    NASA Astrophysics Data System (ADS)

    Farrugia, C. J.; Harris, B.; Leitner, M.; Möstl, C.; Galvin, A. B.; Simunac, K. D. C.; Torbert, R. B.; Temmer, M. B.; Veronig, A. M.; Erkaev, N. V.; Szabo, A.; Ogilvie, K. W.; Luhmann, J. G.; Osherovich, V. A.

    2012-04-01

    We discuss the temporal variations and frequency distributions of solar wind and interplanetary magnetic field parameters during the solar minimum of 2007- 2009 from measurements returned by the IMPACT and PLASTIC instruments on STEREO-A. We find that the density and total field strength were considerably weaker than in the previous minimum. The Alfvén Mach number was higher than typical. This reflects the weakness of magnetohydrodynamic (MHD) forces, and has a direct effect on the solar wind-magnetosphere interactions. We then discuss two major aspects that this weak solar activity had on the magnetosphere using data from Wind and ground-based observations: (a) the level of solar wind driving and the associated dayside contribution to the crosspolar cap potential (CPCP), and (b) the shapes of the magnetopause and bow shock. For (a) we find very weak interplanetary electric field (V xBz = -0.05 ± 0.83 mV/m) and a CPCP of 36.6 ± 18.2 kV. The auroral activity is closely correlated to the prevalent stream-stream interactions.We argue that the Alfvén waves in the fast streams and Kelvin-Helmholtz instability were the predominant agents mediating the transfer of solar wind momentum and energy to the magnetosphere during this 3-year period. For (b) we determine 328 magnetopause and 271 bow shock crossings made by the Cluster 1, Themis B and C spacecraft during a 3-month interval when the daily averages of the magnetic and kinetic energy densities attained their lowest value during the 3 years under survey. We use the same numerical approach as in Fairfield's (1971) empirical model and compare our findings with his classic result. The stand-off distance of the subsolar magnetopause and bow shock were 11.8 RE and 14.35 RE, respectively, making the subsolar magnetosheath thinner by ≈ 1RE. This is mainly due to the low dynamic pressure which result in a sunward shift of the magnetopause The magnetopause is more flared than Fairfield's result. By contrast the bow shock

  16. Deep Solar Activity Minimum 2007-2009: Solar Wind Properties and Major Effects on the Terrestrial Magnetosphere

    NASA Astrophysics Data System (ADS)

    Farrugia, C. J.; Harris, B. S.; Leitner, M.; Moestl, C.; Galvin, A. B.; Simunac, K.; Torbert, R. B.; Temmer, M.; Veronig, A.; Erkaev, N.; Szabo, A.; Ogilvie, K. W.; Luhmann, J. G.; Osherovich, V.

    2012-12-01

    We discuss the temporal variations and frequency distributions of solar wind and IMF parameters during the solar minimum of 2007-2009 from measurements returned by the IMPACT and PLASTIC instruments on STEREO-A. We find that the density and total field strength were significantly weaker than in the previous minimum. The Alfvén Mach number was higher than typical.This reflects the weakness of magnetohydrodynamic (MHD) forces, and has a direct effect on the solar wind-magnetosphere interactions. We then discuss two major aspects that this weak solar activity had on the magnetosphere, using data from textit{Wind} and ground-based observations: (a) the dayside contribution to the cross-polar cap potential (CPCP), and (b) the shapes of the magnetopause and bow shock. For (a) we find a low interplanetary electric field of 1.3 ± 0.9 mV m-1 and a CPCP of 37.3 ± 20.2 kV. The auroral activity is closely correlated to the prevalent stream-stream interactions. We suggest that the Alfvén wave trains in the fast streams and Kelvin-Helmholtz instability were the predominant agents mediating the transfer of solar wind momentum and energy to the magnetosphere during this three-year period. For (b) we determine 328 magnetopause and 271 bow shock crossings made by textit{Geotail, Cluster 1}, and the THEMIS B and C spacecraft during a three-month interval when the daily averages of the magnetic and kinetic energy densities attained their lowest value during the three years under survey. We use the same numerical approach as in Fairfield's (textit{J. Geophys. Res.} 76, 7600, 1971) empirical model and compare our findings with three magnetopause models. The stand-off distance of the subsolar magnetopause and bow shock were 11.8 RE and 14.35 RE, respectively. When comparing with Fairfield's (1971) classic result, we find that the subsolar magnetosheath is thinner by ˜1 RE. This is mainly due to the low dynamic pressure which results in a sunward shift of the magnetopause The

  17. Site Plan & Transverse Section Chickamauga National Military Park ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Transverse Section - Chickamauga National Military Park Tour Roads, Alexander's Bridge, At the confluence of West Chickamauga Creek and Gordon's Slough, Fort Oglethorpe, Catoosa County, GA

  18. 76 FR 22114 - National Emergency Communications Plan (NECP) Tribal Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOMELAND SECURITY National Emergency Communications Plan (NECP) Tribal Report AGENCY: National Protection and Programs Directorate, DHS. ACTION: 60-Day Notice and request for comments; New Information...

  19. 76 FR 2700 - National Protection and Programs Directorate; National Emergency Communications Plan (NECP) Goal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF HOMELAND SECURITY National Protection and Programs Directorate; National Emergency Communications Plan (NECP) Goal 2 Performance Report AGENCY: National Protection and Programs Directorate, DHS. ACTION: 60-day notice...

  20. Career-Life Planning with First Nations People.

    ERIC Educational Resources Information Center

    Offet-Gartner, Kathy

    The Career-Life Planning Model for First Nations People (1997) was created by Drs. Rod McCormick and Norm Admundson to address the need for more culturally sensitive career planning with First Nations people. The most unique thing about this model is the inclusion of many cultural practices, such as: opening and closing prayers, the invitation to…

  1. 77 FR 44144 - National Forest System Land Management Planning; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ...) published a National Forest System land management planning rule in the Federal Register, on April 9, 2012, (77 FR 21162). Errors have been found in the rule with respect to punctuation, hyphenation, and... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning;...

  2. 77 FR 11116 - Draft National Plan To Address Alzheimer's Disease

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... HUMAN SERVICES Draft National Plan To Address Alzheimer's Disease AGENCY: Office of the Assistant.... SUMMARY: HHS is soliciting public input on the draft National Plan to Address Alzheimer's Disease, which... Alzheimer's disease. Coordinate Alzheimer's disease research and services across all federal...

  3. Education for All: National Plan of Action, 2003-2015

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…

  4. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... National Plan is contained in the Report and Order in General Docket No. 87-112. The principal spectrum... (“border regions”). In the border regions, the principal spectrum for the National Plan may be different..., and the U.S. Virgin Islands. No assignments will be made in the spectrum designated for the...

  5. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... National Plan is contained in the Report and Order in General Docket No. 87-112. The principal spectrum... (“border regions”). In the border regions, the principal spectrum for the National Plan may be different..., and the U.S. Virgin Islands. No assignments will be made in the spectrum designated for the...

  6. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... National Plan is contained in the Report and Order in General Docket No. 87-112. The principal spectrum... (“border regions”). In the border regions, the principal spectrum for the National Plan may be different..., and the U.S. Virgin Islands. No assignments will be made in the spectrum designated for the...

  7. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... National Plan is contained in the Report and Order in General Docket No. 87-112. The principal spectrum... (“border regions”). In the border regions, the principal spectrum for the National Plan may be different..., and the U.S. Virgin Islands. No assignments will be made in the spectrum designated for the...

  8. Water resources management plan: Great Basin National Park

    SciTech Connect

    Jacobs, R.W.; Flora, M.

    1994-06-01

    The enabling legislation creating Great Basin National Park calls for the National Park Service (NPS) to protect, manage, and administer the park in such manner as to conserve and protect the scenery as well as the natural, geologic, historic, and archaeological resources of the park. NPS policies require that each unit of the National Park System develop and implement a General Management Plan (GMP). This plan is designed to serve as a management action plan to guide park water-related activities over the next 10 to 15 years. This WRMP is complementary to, and consistent with, other existing park management documents, including the GMP (NPS 1993) and Resource Management Plan (in review).

  9. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    USGS Publications Warehouse

    U.S. Geological Survey

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  10. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    SciTech Connect

    Not Available

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  11. National Ignition Facility (NIF) operations procedures plan

    SciTech Connect

    Mantrom, D.

    1998-05-06

    The purpose of this Operations Procedures Plan is to establish a standard procedure which outlines how NIF Operations procedures will be developed (i.e , written, edited, reviewed, approved, published, revised) and accessed by the NIF Operations staff who must use procedures in order to accomplish their tasks. In addition, this Plan is designed to provide a guide to the NIF Project staff to assist them in planning and writing procedures. Also, resource and scheduling information is provided.

  12. Year 6 Planning Exemplification. National Literacy Strategy.

    ERIC Educational Resources Information Center

    Department for Education and Skills, London (England).

    First in a series, this booklet contains suggestions for planning literacy in Year 6. This Year 6 plan for 2001-2002 and the short-term unit plan for narrative writing are a distillation of the work of a representative group of Year 6 teachers. It contains the Year 6 Term 1 Units 2 and 5 on Narrative Writing. It begins with an outline of the basic…

  13. National Action Plan for Energy Efficiency Report

    SciTech Connect

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  14. 77 FR 67783 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ..., Reporting and recordkeeping requirements, Superfund, Water pollution control, and Water supply. Dated... AGENCY 40 CFR Part 300 National Oil and Hazardous Substance Pollution Contingency Plan National..., is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA...

  15. Education's Role in National Development Plans: Ten Country Cases.

    ERIC Educational Resources Information Center

    Thomas, R. Murray, Ed.

    The place education has been assigned in the national development programs of 10 nations is discussed, the problems that these countries have encountered in managing education are examined, and the measures adopted to solve educational problems are assessed. Included are the following papers: (1) "The Nature of National Development Planning" (R.…

  16. Handbook for Decentralized Education Planning. Implementing National EFA Plans

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    The Dakar 2000 goal of Education For All (EFA) is at the center of UNESCO's education activities worldwide. The wide-ranging efforts to achieve EFA in many countries involve education reform, development strategies and plans. Decentralization, a major component in modernizing the public sector, is also applicable to the education sector. The…

  17. Serotype and genotype analysis of dengue virus by sequencing followed by phylogenetic analysis using samples from three mini outbreaks-2007-2009 in Pakistan

    PubMed Central

    2011-01-01

    Background Since the first reported outbreak of dengue hemorrhagic fever in Pakistan, several mini outbreaks have erupted in the region. Dengue virus serotype 3 (DEN-3) was first documented in 2005 outbreak in Karachi. Reports show that serotype 3 is prevalent in Lahore since 2008. Serotype 2 (DEN-2) is the major circulating serotype in Pakistan as it is documented since 1994. We have conducted a detailed study of three outbreaks of dengue virus infection that occurred in years 2007, 2008 and 2009 in Lahore by using molecular techniques such as PCR and nucleotide sequencing of the C-prM gene junction of Dengue virus. Results Through the analysis of 114 serum samples collected over the period of three years (2007-2009), total 20 patients were found to be infected with dengue virus. In year 2007, four were positive for serotype 2 and one sample was positive for serotype DEN-3. In 2008, five samples had concurrent infection with serotypes DEN-2 and DEN-3 while three samples were infected only with serotype DEN-2. In year 2009, one sample had concurrent infection with serotypes DEN-2 and DEN-3 while six were positive for serotype DEN-2 only. Conclusions Our study showed that serotype DEN-2 was dominant in positive samples of dengue virus infection collected during the period of three years (2007-2009). The other serotype present was serotype DEN-3. Genotypes of serotype DEN-2 and serotype DEN-3 were subtype IV and subtype III, respectively. PMID:21906394

  18. 75 FR 43929 - National Weather Service (NWS) Strategic Plan, 2011-2020

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... National Oceanic and Atmospheric Administration National Weather Service (NWS) Strategic Plan, 2011-2020 AGENCY: National Weather Service, National Oceanic and Atmospheric Administration, Department of Commerce. ACTION: Notice; request for comments. SUMMARY: The National Weather Service's (NWS) Strategic Plan...

  19. Samish Indian Nation Long-Term Strategic Energy Plan

    SciTech Connect

    Christine Woodward; B. Beckley; K. Hagen

    2005-06-30

    The Tribes strategic energy planning effort is divided into three phases: (1) Completing an Energy Resource Assessment; (2) Developing a Long-Term Strategic Energy Plan; and (3) Preparing a Strategic Energy Implementation Plan for the Samish Homelands. The Samish Indian Nation developed a comprehensive Strategic Energy plan to set policy for future development on tribal land that consists of a long-term, integrated, systems approach to providing a framework under which the Samish Community can use resources efficiently, create energy-efficient infrastructures, and protect and enhance quality of life. Development of the Strategic Energy plan will help the Samish Nation create a healthy community that will sustain current and future generations by addressing economic, environmental, and social issues while respecting the Samish Indian Nation culture and traditions.

  20. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    SciTech Connect

    Farmer, Carl J.

    2015-09-01

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  1. North & South Elevations and Bridge Plan Chickamauga National ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    North & South Elevations and Bridge Plan - Chickamauga National Military Park Tour Roads, Gordon's Slough Bridge, At the confluence of Alexander's Bridge Road and Gordon's Slough, southeast of Alexander's Bridge, Fort Oglethorpe, Catoosa County, GA

  2. Site Plan and Transverse Section Chickamauga National Military Park ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan and Transverse Section - Chickamauga National Military Park Tour Roads, Gordon's Slough Bridge, At the confluence of Alexander's Bridge Road and Gordon's Slough, southeast of Alexander's Bridge, Fort Oglethorpe, Catoosa County, GA

  3. East Elevation, Bridge Plan & Truss Details Chickamauga National ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    East Elevation, Bridge Plan & Truss Details - Chickamauga National Military Park Tour Roads, Alexander's Bridge, At the confluence of West Chickamauga Creek and Gordon's Slough, Fort Oglethorpe, Catoosa County, GA

  4. Criticality emergency planning at Oak Ridge National Laboratory

    SciTech Connect

    Green, J.H.; Cain, G.C.

    1983-01-01

    A plan to protect personnel and control the spread of contamination in the event of a radiation accident at Oak Ridge National Laboratory (ORNL) is outlined. Procedures and personnel are presented. (ACK)

  5. National Development Plan 1988-1990.

    PubMed

    1988-01-01

    This document contains eight provisions from the fourth chapter (on population issues) of the 1988-90 Development Plan of Mauritius. Because the goals of previous population policies have been attained in Mauritius (with fertility at below replacement levels), social and family welfare goals can be predominant in the development plan, including improvements in health, education, access to employment opportunities, and raising the status of women. Also, despite its success, the family planning program contains some weaknesses which should be addressed, including a high dropout rate and an over-reliance on oral contraceptives. Additionally, the IEC (information, education, and communication) component of the program should be refined to reach hard-core nonacceptors. Breast feeding must be encouraged, especially among working mothers, and the efficiency of the family planning program must be improved to reduce the high reliance on abortion. Because of the mortality and morbidity associated with illegal abortions, the government must develop a consensus on the issue of legalizing this procedure. PMID:12289391

  6. National Center for Combating Terrorism Strategic Plan, September 2003

    SciTech Connect

    Bechtel Nevada

    2003-09-01

    National Center for Combating Terrorism Strategic Plan is to document the mission, vision, and goals for success; define the build plan; and describe initiatives that support the U.S. Department of Homeland Security, U.S. Department of Defense, U.S. Department of Energy, U.S. Department of Justice, intelligence community, National Governors Association, and other organizations or departments with combating terrorism training, testing, and technology responsibilities.

  7. From Physical Activity Guidelines to a National Activity Plan

    ERIC Educational Resources Information Center

    Bornstein, Daniel B.; Pate, Russell R.

    2014-01-01

    The U.S. National Physical Activity Plan (NPAP) is a comprehensive strategic plan aimed at increasing physical activity levels in all segments of the American population. The purpose of this paper is to summarize the development of the NPAP, provide an update on the status of the NPAP, and comment on the future of the NPAP. The NPAP was released…

  8. 20 CFR 632.18 - Regional and national planning meetings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Regional and national planning meetings. 632.18 Section 632.18 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Planning, Application...

  9. 20 CFR 632.18 - Regional and national planning meetings.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Regional and national planning meetings. 632.18 Section 632.18 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Planning, Application...

  10. 20 CFR 632.18 - Regional and national planning meetings.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Regional and national planning meetings. 632.18 Section 632.18 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Planning, Application...

  11. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    EPA Science Inventory

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  12. Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001

    SciTech Connect

    1995-12-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

  13. Pacific Northwest National Laboratory institutional plan: FY 1996--2001

    SciTech Connect

    1996-01-01

    This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.

  14. National Ignition Facility Risk Management Plan

    SciTech Connect

    Brereton, S.J.

    1997-02-01

    The NIF Risk Management Plan has been prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide to support Critical Decision 3 of the NIF Project. The objectives of the plan are to: 1) identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule, 2) assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H (environment, safety and health), costs, and schedule, and 3) address each identified risk in terms of suitable risk mitigation measures. The documents that form the basis for this risk assessment are as follows: 1. Final Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (DOE, 1996a) and Record of Decision (DOE, 1996b), 2. Preliminary Hazards Analysis (Brereton, 1993), 3. Fire Hazards Analysis (Jensen, 1997), 4. Preliminary Safety Analysis Report (LLNL, 1996a), 5. Reliability, Availability and Maintainability Report, 6. Radiation Protection Evaluation, 7. Primary Criteria and Functional Requirements (LLNL, 1996b), 8. Project Execution Plan (DOE, 1996c), 9. Schedule Risk Assessment, 10. Construction Safety Program (LLNL, 1997), 11. Title I Design Media, 12. Congressional Data Sheet. The process used in developing this plan was to form a Risk Assessment team of knowledgeable project personnel. This included: Assurances Manager, Systems Integration Manager, Project Control Manager, a Risk Management consultant, Deputy Associate Project Engineer for Activation and Start-up (Co-chairperson), and Lead Engineer for Safety Analysis (Co-chairperson). They were familiar with the risk basis documents and developed a list of the key risk elements. A methodology for assigning likelihoods, consequences, and risks was developed. Risk elements were then reviewed, and likelihoods, consequences, and risks were assigned. Risk mitigation measures were then developed. Comments were obtained

  15. 77 FR 15052 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... will inform the preparation of the final plan. Per our prior notice, which was published at 77 FR 2514... QUALITY National Ocean Council--National Ocean Policy Draft Implementation Plan AGENCY: Council on Environmental Quality. ACTION: Extension of comment period. SUMMARY: On July 19, 2010, President Obama...

  16. An Example of National Literacy Strategy Medium-Term Planning. The National Literacy Strategy.

    ERIC Educational Resources Information Center

    Department for Education and Skills, London (England).

    These medium-term plans have been produced to support, but not prescribe, teachers' planning. They exemplify ways in which England's National Literacy Strategy (NLS) Framework objectives (and the Early Learning Goals) can be clustered. The Key Stage 1 and Key Stage 2 medium term plans cluster the NLS text, sentence and word level objectives into…

  17. National Civil Applications Program: strategic plan vision for 2005

    USGS Publications Warehouse

    U.S. Geological Survey

    2004-01-01

    The National Mapping Division (NMD) has developed this comprehensive strategic plan to chart the course of the National Civil Applications Program (NCAP) over the next 5 years. To meet the challenges of the future, the NCAP is changing its program emphases, methods of responding to customer needs, and business practices. The NCAP Strategic Plan identifies the new direction for the program through a series of strategic thrusts and goals for managers to use in formulating plans, establishing program emphases, and determining resource needs and allocations.

  18. National Ignition Facility pollution prevention and waste minimization plan

    SciTech Connect

    Cantwell, B.; Celeste, J.

    1998-09-01

    This document is the Lawrence Livermore National Laboratory (LLNL) National Ignition Facility (NIF) Pollution Prevention and Waste Minimization Plan. It will not only function as the planning document for anticipating, minimizing, and mitigating NIF waste generation, but it is also a Department of Energy (DOE) milestone document specified in the facility's Mitigation Action Plan (MAP). As such, it is one of the ''living'' reference documents that will guide NIF operations through all phases of the project. This document will be updated periodically to reflect development of the NIF, from construction through lifetime operations.

  19. 76 FR 41273 - National Emergency Communications Plan (NECP) Tribal Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... Register on April 20, 2011, at 76 FR 22114, for a 60-day public comment period. DHS received no comments... SECURITY National Emergency Communications Plan (NECP) Tribal Report AGENCY: National Protection and... Directorate (NPPD), Office of Cybersecurity and Communications (CS&C), Office of Emergency Communications...

  20. National Infrastructure Protection Plan: Partnering to Enhance Protection and Resiliency

    ERIC Educational Resources Information Center

    US Department of Homeland Security, 2009

    2009-01-01

    The overarching goal of the National Infrastructure Protection Plan (NIPP) is to build a safer, more secure, and more resilient America by preventing, deterring, neutralizing, or mitigating the effects of deliberate efforts by terrorists to destroy, incapacitate, or exploit elements of our Nation's critical infrastructure and key resources (CIKR)…

  1. Towards a National Plan in Applied Education and Training.

    ERIC Educational Resources Information Center

    Adderley, John

    The National Computing Centre Limited (NCC), established by the British Government to extend and improve the use of computers in the United Kingdom, is a major force in computer science education. As part of the overall national plan, training course packages consisting of lecturer's materials, visual aids and student notes have been prepared for…

  2. National Ignition Facility Project Execution Plan

    SciTech Connect

    Moses, E

    2000-08-14

    The ''National Ignition Facility (NIF) Justification of Mission Need'', which was approved by the Secretary of Energy in January 1993, defines the mission of the National Inertial Confinement Fusion (ICF) Program and discusses the specific mission of the NIF Project. The NIF experimental capability will allow nuclear-weapons scientists to assess stockpile problems, verify computational tools, test for nuclear-weapons effects, and increase their understanding of weapons physics. The three weapons laboratory directors and the National Nuclear Security Administration (NNSA) Deputy Administrator for Defense Programs have reviewed the role of the NIT; in Stockpile Stewardship in a joint letter. Along with the Accelerated Strategic Computing Initiative numerical simulations and other aboveground experimental facilities, the NIF will provide critical data that will allow the United States to maintain its technical capabilities in nuclear weapons in the absence of underground testing. As a secondary objective, the NIF will advance our understanding of ICF and help to assess its potential as an energy source. Achieving fusion ignition in the NIF will advance both defense and energy objectives. In affirming the Project's Critical Decision 2,* ''Approval of New Start'', the Secretary of Energy verified the mission need and emphasized that the NIF has the potential to contribute significantly to the DOE missions.

  3. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    SciTech Connect

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  4. Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

    SciTech Connect

    Pearson, Erik W.

    2000-03-01

    The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

  5. 77 FR 6581 - Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park, Idaho...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... National Park Service Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National... prepare a Supplemental Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park... 168, Yellowstone National Park, WY 82190, (307) 344-2035. SUPPLEMENTARY INFORMATION: In January...

  6. 75 FR 67682 - Sequoia National Forest, California; Sequoia National Forest Plan Amendment, Giant Sequoia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... Notice of Availability of the Draft EIS (75 FR 47592) for more detailed information related to the Giant...; ] DEPARTMENT OF AGRICULTURE Forest Service Sequoia National Forest, California; Sequoia National Forest Plan Amendment, Giant Sequoia National Monument Draft Environmental Impact Statement, Comprehensive...

  7. 77 FR 31215 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Dated: May 8... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan; National..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency...

  8. Planning for Life. A Compendium of Nationally Recognized Career Planning Programs.

    ERIC Educational Resources Information Center

    National Consortium of State Career Guidance Supervisors, Columbus, OH.

    This compendium, which is designed to provide readers with a variety of career planning (CP) program ideas, contains abstracts summarizing 10 elementary, middle, and high school CP programs identified as exemplary by a national review team. Explained in chapter 1 are the primary objectives of the Planning for Life program, which is jointly…

  9. Planning action No. 2 planning criteria. Arapaho and Roosevelt National Forests and Pawnee National Grassland. Forest plan revision

    SciTech Connect

    Not Available

    1992-06-01

    The development of planning criteria is the second phase in the revision of the Forest Plan. Planning criteria are designed to guide the collection and use of inventory data and information, the analysis of the management situation, and the design, formulation, and evaluation of alternatives. Volume I of Planning Action 2 describes the specific methods used to analyze the management situation. Volume II of the Planning Action 2 describes the analysis process planned for the Forest Plan Revision. It includes a discussion of how to formulate and evaluate the alternatives, plus a summary of the needs for completion of Planning Action 4, the Analysis of the Management Situation (AMS).

  10. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

    SciTech Connect

    Marutzky, Sam; Farnham, Irene

    2014-10-01

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

  11. Climate adaptation planning in practice: an evaluation of adaptation plans from three developed nations

    SciTech Connect

    Preston, Benjamin L; Westaway, Richard M.; Yuen, Emma J.

    2011-04-01

    Formal planning for climate change adaptation is emerging rapidly at a range of geo-political scales. This first generation of adaptation plans provides useful information regarding how institutions are framing the issue of adaptation and the range of processes that are recognized as being part of an adaptation response. To better understand adaptation planning among developed nations, a set of 57 adaptation plans from Australia, the United Kingdom and the United States was evaluated against a suite of 19 planning processes identified from existing guidance instruments for adaptation planning. Total scores among evaluated plans ranged from 16% of the maximum possible score to 61%, with an average of 37%. These results suggest adaptation plans are largely under-developed. Critical weaknesses in adaptation planning are related to limited consideration for non-climatic factors as well as neglect for issues of adaptive capacity including entitlements to various forms of capital needed for effective adaptation. Such gaps in planning suggest there are opportunities for institutions to make better use of existing guidance for adaptation planning and the need to consider the broader governance context in which adaptation will occur. In addition, the adaptation options prescribed by adaptation plans reflect a preferential bias toward low-risk capacity-building (72% of identified options) over the delivery of specific actions to reduce vulnerability. To the extent these findings are representative of the state of developed nation adaptation planning, there appear to be significant deficiencies in climate change preparedness, even among those nations often assumed to have the greatest adaptive capacity.

  12. Planning for primary health care: the case of the Sierra Leone National Action Plan.

    PubMed

    Decosas, J

    1990-01-01

    The National Action Plan for Primary Health Care, a planning document of the Sierra Leonean Ministry of Health for the restructuring of the country's rural health services, is analyzed in its social, economic, and historical context. It appears to be an attempt of the national government to gain control over the highly devolved health care delivery system, but the state has neither the political will nor the power to achieve this goal. The utility of the document is therefore in doubt, which raises two important questions: Whose interests does this plan serve, and at whose cost? PMID:2307554

  13. The United States national volcanic ash operations plan for aviation

    USGS Publications Warehouse

    Albersheim, Steven; Guffanti, Marianne

    2009-01-01

    Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.

  14. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed

  15. Argonne National Laboratory institutional plan FY 2001--FY 2006.

    SciTech Connect

    Beggs, S.D.

    2000-12-07

    This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes strategic plans for human resources; environmental protection, safety, and health; site and

  16. Marketing Plan for the National Security Technology Incubator

    SciTech Connect

    2008-03-31

    This marketing plan was developed as part of the National Security Preparedness Project by the Arrowhead Center of New Mexico State University. The vision of the National Security Technology Incubator program is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety and security. The plan defines important aspects of developing the incubator, such as defining the target market, marketing goals, and creating strategies to reach the target market while meeting those goals. The three main marketing goals of the incubator are: 1) developing marketing materials for the incubator program; 2) attracting businesses to become incubator participants; and 3) increasing name recognition of the incubator program on a national level.

  17. Sandia National Laboratories Institutional Plan FY1994--1999

    SciTech Connect

    Not Available

    1993-10-01

    This report presents a five year plan for the laboratory. This plan takes advantage of the technical strengths of the lab and its staff to address issues of concern to the nation on a scope much broader than Sandia`s original mission, while maintaining the general integrity of the laboratory. The plan proposes initiatives in a number of technologies which overlap the needs of its customers and the strengths of its staff. They include: advanced manufacturing technology; electronics; information and computational technology; transportation energy technology and infrastructure; environmental technology; energy research and technology development; biomedical systems engineering; and post-cold war defense imperatives.

  18. National & Legislative View: The National Science Foundation Long-Range Plan FY 1989-1993.

    ERIC Educational Resources Information Center

    Paldy, Lester G., Ed.

    1989-01-01

    Discusses the current status and major issues affecting the quality and size of the human resources pool of scientists, engineers, and technical personnel. Indicates the role and strategies the National Science Foundation plans to take to address the deficiences. (RT)

  19. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... National Park Service Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement... Availability of the Draft Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan... Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan for Biscayne National Park,...

  20. The U.S. National Plan for Civil Earth Observations

    NASA Astrophysics Data System (ADS)

    Stryker, T.; Clavin, C.; Gallo, J.

    2014-12-01

    Globally, the United Sates Government is one of the largest providers of environmental and Earth-system data. As the nation's Earth observation capacity has grown, so have the complexity and challenges associated with managing Earth observation systems and related data holdings. In July 2014, the White House Office of Science and Technology Policy released the first-ever National Plan for Civil Earth Observations to address these challenges. The Plan provides a portfolio management-based framework for maximizing the value of Federal Earth observations. The Plan identifies Federal priorities for Earth observations and improved management of their data. Through routine assessments, expanding data management efforts, interagency planning, and international collaboration, OSTP and its partner agencies will seek ensure the continued provision of and access to key Earth observation data, which support a broad range of public services and research programs. The presenters will provide a detailed review of the components of the National Plan, its impacts across the Federal agencies involved in Earth observations, and associated efforts to enable interagency coordination.

  1. 78 FR 13316 - National Forest System Land Management Planning Directives

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ...The Forest Service has issued proposed directives to Forest Service Handbook (FSH 1909.12) and Manual (FSM 1920) establishing procedures and responsibilities for implementing the National Forest System (NFS) land management planning regulation. Issuance of these proposed directives will provide consistent overall guidance to Forest Service Line Officers and Agency employees in developing,......

  2. 14 CFR 151.3 - National Airport Plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false National Airport Plan. 151.3 Section 151.3 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS... provide a system of public airports adequate to anticipate and meet the needs of civil aeronautics. (b)...

  3. 14 CFR 151.3 - National Airport Plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false National Airport Plan. 151.3 Section 151.3 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS... provide a system of public airports adequate to anticipate and meet the needs of civil aeronautics. (b)...

  4. 14 CFR 151.3 - National Airport Plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false National Airport Plan. 151.3 Section 151.3 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS... provide a system of public airports adequate to anticipate and meet the needs of civil aeronautics. (b)...

  5. 14 CFR 151.3 - National Airport Plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false National Airport Plan. 151.3 Section 151.3 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS... provide a system of public airports adequate to anticipate and meet the needs of civil aeronautics. (b)...

  6. 14 CFR 151.3 - National Airport Plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false National Airport Plan. 151.3 Section 151.3 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS... provide a system of public airports adequate to anticipate and meet the needs of civil aeronautics. (b)...

  7. Shock Timing Plan for the National Ignition Campaign

    NASA Astrophysics Data System (ADS)

    Munro, D. H.; Robey, H. F.; Spears, B. K.; Boehly, T. R.

    2006-10-01

    We report progress on the design of the shock timing tuning procedure for the 2010 ignition campaign at the National Ignition Facility. Our keyhole target design provides adequate drive surrogacy for us to time the first three shocks empirically. The major risk to our plan is hard x-ray preheat, which can cause the diagnostic window to become opaque.

  8. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Register, on April 9, 2012 (77 FR 21162). DATES: These corrections are effective April 19, 2013. ADDRESSES... Register, page 21162, April 9, 2012, (77 FR 21162) the United States Department of Agriculture (Department... Forest Service 36 CFR Part 219 RIN 0596-AB86 National Forest System Land Management Planning;...

  9. 76 FR 22295 - National Poultry Improvement Plan and Auxiliary Provisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection 9 CFR Part 145 RIN 0579-AD21 National Poultry Improvement Plan and Auxiliary Provisions Correction In rule document 2011-6539 appearing on pages 15791-15798 in the issue...

  10. National Risk Management Research Laboratory Strategic plan and Implementation - Overview

    EPA Science Inventory

    This publication provides an overview of the strategic plan recently developed by the National Risk Management Research Laboratory (NRMRL). It includes a description of NRMRL's mission and goals and their alignment with Agency goals. Additionally, the overview contains a brief se...

  11. Wildland Fire Management Plan for Brookhaven National Laboratory

    SciTech Connect

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site

  12. 75 FR 4842 - Winter Use Plan, Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... National Park Service Winter Use Plan, Environmental Impact Statement, Yellowstone National Park AGENCY... Impact Statement for a Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to the National... Environmental Impact Statement (EIS) for a Winter Use Plan for Yellowstone ] National Park, located......

  13. Brookhaven National Laboratory Institutional Plan FY2001--FY2005

    SciTech Connect

    Davis, S.

    2000-10-01

    Brookhaven National Laboratory is a multidisciplinary laboratory in the Department of Energy National Laboratory system and plays a lead role in the DOE Science and Technology mission. The Laboratory also contributes to the DOE missions in Energy Resources, Environmental Quality, and National Security. Brookhaven strives for excellence in its science research and in facility operations and manages its activities with particular sensitivity to environmental and community issues. The Laboratory's programs are aligned continuously with the goals and objectives of the DOE through an Integrated Planning Process. This Institutional Plan summarizes the portfolio of research and capabilities that will assure success in the Laboratory's mission in the future. It also sets forth BNL strategies for our programs and for management of the Laboratory. The Department of Energy national laboratory system provides extensive capabilities in both world class research expertise and unique facilities that cannot exist without federal support. Through these national resources, which are available to researchers from industry, universities, other government agencies and other nations, the Department advances the energy, environmental, economic and national security well being of the US, provides for the international advancement of science, and educates future scientists and engineers.

  14. 77 FR 2514 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... QUALITY National Ocean Council--National Ocean Policy Draft Implementation Plan AGENCY: Council on Environmental Quality. ACTION: Notice of availability; request for comments. SUMMARY: On July 19, 2010... and ocean acidification; Water Quality and Sustainable Practices on Land: Enhance water quality in...

  15. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... National Park Service General Management Plan, Draft Environmental Impact Statement, Big Thicket National... announces the availability of a Draft Environmental Impact Statement for the General Management Plan, Big... FURTHER INFORMATION CONTACT: Doug Neighbor, Superintendent, Big Thicket National Preserve, 6044 FM...

  16. Idaho National Laboratory (INL) Sitewide Institutional Controls Plan

    SciTech Connect

    W. L. Jolley

    2006-07-27

    On November 9, 2002, the U.S. Environmental Protection Agency (EPA), the U.S. Department of Energy (DOE), and the Idaho Department of Environmental Quality approved the Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites, which requires a Sitewide Institutional Controls Plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. The revision is needed to provide an update as remedial actions are completed and new areas of concern are found. This Sitewide Institutional Controls Plan is based on guidance in the May 3, 1999, EPA Region 10 Final Policy on the Use of Institutional Controls at Federal Facilities; the September 29, 2000, EPA guidance Institutional Controls: A Site Manager's Guide to Identifying, Evaluating, and Selecting Institutional Controls at Superfund and RCRA Corrective Action Cleanups; and the April 9, 2003, DOE Policy 454.1, "Use of Institutional Controls." These policies establish measures that ensure short- and long-term effectiveness of institutional controls that protect human health and the environment at federal facility sites undergoing remedial action pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or corrective action pursuant to the Resource Conservation and Recovery Act (RCRA). The site-specific institutional controls currently in place at the Idaho National Laboratory are documented in this Sitewide Institutional Controls Plan. This plan is being updated, along with the Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan, to reflect the progress of remedial activities and changes in CERCLA sites.

  17. Steps toward a national disaster plan for obstetrics.

    PubMed

    Daniels, Kay; Oakeson, Ann Marie; Hilton, Gillian

    2014-07-01

    Hospitals play a central role in disasters by receiving an influx of casualties and coordinating medical efforts to manage resources. However, plans have not been fully developed in the event the hospital itself is severely damaged, either from natural disasters like earthquakes or tornados or manmade events such as a massive electrical failure or terrorist attacks. Of particular concern is the limited awareness of the obstetric units' specialized needs in the world of disaster planning. Within the same footprint of any obstetric unit, there exists a large variety of patient acuity and needs including laboring women, postoperative patients, and healthy postpartum patients with their newborns. An obstetric-specific triage method is paramount to accurately assess and rapidly triage patients during a disaster. An example is presented here called OB TRAIN (Obstetric Triage by Resource Allocation for Inpatient). To accomplish a comprehensive obstetric disaster plan, there must be 1) national adoption of a common triage and evacuation language including an effective patient tracking system to avoid maternal-neonatal separation; 2) a stratification of maternity hospital levels of care; and 3) a collaborative network of obstetric hospitals, both regionally and nationally. However, obstetric disaster planning goes beyond evacuation and must include plans for shelter-in-place and surge capacity, all uniquely designed for the obstetric patient. Disasters, manmade or natural, are neither predictable nor preventable, but we can and should prepare for them. PMID:24901273

  18. [Occurrence of head pediculosis and its control in children's homes in selected provinces of Poland in the years 2007-2009].

    PubMed

    Sawicka, Bozena; Mikulak, Ewa; Gliniewicz, Aleksandra

    2011-01-01

    Despite civilisation development and the easy access to pediculicides, head pediculosis remains still the social, hygienic and medical problem. In the years 2007 - 2009 in children's homes in selected provinces of Poland the questionnaire survey on the occurrence of head pediculosis and its control have been conducted. From 127 orphanages 61 (48.03%) sent back fulfilled questionnaire. The infestation level ranged from 4.63% (Swietokrzyskie Province, 2009) until 17.63% (Mazowieckie Province 2007) in the surveyed children's homes. The most head pediculosis cases were observed among girls 6 - 12 years old in children's homes from all regions investigated. The profile of pediculicides used had been changed during our study: in the first year the most often pediculicides with the insecticide permethrin were used. In the next years their use decreased, but the use of herbal and silicone pediculicides increased. The efficacy of anti-louse product was the most important factor for the respondents when they choose an pediculicide. PMID:22390057

  19. Relationship Between Frequency and Intensity of Cigarette Smoking and TTFC/C Among Students of the GYTS in Select Countries, 2007-2009

    PubMed Central

    Lam, Eugene; Giovino, Gary A.; Shin, Mikyong; Lee, Kyung A.; Rolle, Italia; Asma, Samira

    2015-01-01

    BACKGROUND This study assessed the construct validity of a measure of nicotine dependence that was used in the Global Youth Tobacco Survey (GYTS). METHODS Using 2007-2009 data from the GYTS, subjects from 6 countries were used to assess current smokers’ odds of reporting time to first cigarette or craving positive (TTFC/C+) by the number of cigarette smoking days per month (DPM) and the number of cigarettes smoked per day (CPD). RESULTS The percentage of GYTS smokers who reported TTFC/C+ ranged from 58.0% to 69.7%. Compared with students who smoked on 1-2 DPM, those who smoked on 3-9 DPM had 3 times the adjusted odds of reporting TTFC/C+. The adjusted odds of reporting TTFC/C+ were 3 to 7 times higher among those who smoked 10-29 DPM and 6 to 20 times higher among daily smokers. Similarly, the adjusted odds of TTFC/C+ were 3-6 times higher among those who smoked 2-5 CPD and 6 to 20 times higher among those who smoked >6 CPD, compared to those who smoked <1 CPD. CONCLUSION Associations of TTFC/C+ prevalence with both frequency and intensity of cigarette smoking provide a construct validation of the GYTS question used to assess respondents’ TTFC/C status. PMID:25117888

  20. Arctic Ocean circulation, processes and water masses: A description of observations and ideas with focus on the period prior to the International Polar Year 2007-2009

    NASA Astrophysics Data System (ADS)

    Rudels, Bert

    2015-03-01

    The evolving knowledge of the Arctic Ocean, its hydrography and its water masses and their transformations and circulation is reviewed starting with the observations made on Fram 1893-1896 and extending to the International Polar Year (IPY) 2007-2009. The expeditions and observations after Fram to the mid 20th century as well as the more extensive and systematic studies of water masses and circulation made from ice stations and airborne expeditions from the late 1940s to the late 1970s are briefly described. The early concepts of the connections and exchanges between the Arctic Ocean and the world ocean are also discussed. In the 1980s scientific icebreakers were beginning to enter the inner parts of the Arctic Ocean and large international programmes were launched, culminating in the IPY. The changes in the Arctic Ocean, first noted in the Atlantic layer in 1990 and shortly after in the upper layers, are described. The exchanges between the Arctic Ocean and the surrounding seas through the four main openings, Fram Strait, Barents Sea, Bering Strait and the Canadian Arctic Archipelago as well the volume and freshwater balances of the Arctic Ocean are examined.

  1. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  2. 77 FR 33239 - Prairie Stewardship Plan/Environmental Impact Statement, San Juan Island National Historical Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... National Park Service Prairie Stewardship Plan/Environmental Impact Statement, San Juan Island National... Impact Statement for Prairie Stewardship Plan, San Juan Island National Historical Park, Washington... Prairie Stewardship Plan, as called for in the 2008 General Management Plan. The Prairie Stewardship...

  3. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida....

  4. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... National Park Service Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National... comment period for Draft Environmental Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan...

  5. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... national market system plans. 242.608 Section 242.608 Commodity and Securities Exchanges SECURITIES AND... SECURITY FUTURES Regulation Nms-Regulation of the National Market System § 242.608 Filing and amendment of national market system plans. (a) Filing of national market system plans and amendments thereto. (1)...

  6. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... national market system plans. 242.608 Section 242.608 Commodity and Securities Exchanges SECURITIES AND... SECURITY FUTURES Regulation Nms-Regulation of the National Market System § 242.608 Filing and amendment of national market system plans. (a) Filing of national market system plans and amendments thereto. (1)...

  7. 76 FR 50494 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Scoping Period for Water Resources Management Plan/Environmental Impact Statement for Mojave National... National Park Service is preparing a Water Resources Management Plan/Environmental Impact Statement...

  8. 76 FR 23623 - Backcountry Management Plan, Environmental Impact Statement, Grand Canyon National Park, Arizona

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... National Park Service Backcountry Management Plan, Environmental Impact Statement, Grand Canyon National... prepare an Environmental Impact Statement for the Backcountry Management Plan, Grand Canyon National Park... for Grand Canyon National Park. This plan will help guide park decisions on protecting natural...

  9. NOAA's Weather-Ready Nation: Progress and Plans

    NASA Astrophysics Data System (ADS)

    Scharfenberg, K.

    2014-12-01

    The National Oceanic and Atmospheric Administration (NOAA) Weather-Ready Nation program is about building community resilience in the face of increasing vulnerability to extreme weather and water events. Through community partnerships and infusion of new science and technology, better preparedness is reducing the devastating impacts of these extreme events. For the past three years, the National Weather Service has been leading the Weather-Ready Nation strategy through a number of initiatives, focused around a series of pilot projects for transforming internal National Weather Service Operations. The "Emergency Response Specialist" technical role and associated training has been developed to better apply new hazardous weather research and technology to critical community decisions. High-resolution storm surge inundation mapping was introduced to the public in 2014 during Hurricane Arthur with successful results. The dual-polarization upgrade to the Nation's weather radar network has also been completed, with successful application of improved tornado, flash flood, and winter storm warning services. This presentation will focus on the application of these science initiatives under the NOAA Weather-Ready Nation program, and will further discuss NWS plans for operational application of future advances in research and technology.

  10. Natural Resource Management Plan for Brookhaven National Laboratory

    SciTech Connect

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  11. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect

    Holland, Robert C.

    2010-02-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  12. [Indonesia draws up plans for a national strategy].

    PubMed

    1991-01-01

    Dr. Sumedha Khanna, the World Health Organization representative in Indonesia, has reported that Indonesia is about to undertake a national level evaluation of maternal health care and training of midwives with the help of a UN subsidy. The results will be presented at a high level seminar planned for July 1992. The main elements of the national strategy and plan of action will also be developed at the meeting and integrated into the National Health Plan. The goal is to reduce maternal mortality to half its current level of 4500/100,000 live births by the year 2000. Part of the strategy will be to remedy the shortage of qualified midwives and of emergency services. Priority will be given to providing each village or health center with a qualified nurse-midwife. The Indonesian government expects to train 33,000 nurse-midwives within 5 years. The World Bank has agreed to subsidize training of 15,000. Physicians in district hospitals will be trained in essential obstetrical functions with the collaboration of the Indonesian Society of Obstetricians and Gynecologists. UNICEF is reportedly prepared to help. The Indonesian Association of Midwives has supported the initiative by using surveys of maternal mortality in different parts of the country to analyze the need to improve the health of Indonesian women. PMID:12284954

  13. Idaho National Laboratory Site Long-Term Stewardship Implementation Plan

    SciTech Connect

    B. E. Olaveson

    2006-07-27

    The U.S. Department of Energy has established long-term stewardship programs to protect human health and the environment at sites where residual contamination remains after site cleanup. At the Idaho National Laboratory Site, Comprehensive Environmental Response, Compensation, and Liability Act (CERLA) long-term stewardship activities performed under the aegis of regulatory agreements, the Federal Facility Agreement and Consent Order for the Idaho National Laboratory, and state and federal requirements are administered primarily under the direction of the Idaho Cleanup Project. It represents a subset of all on-going environmental activity at the Idaho National Laboratory Site. This plan provides a listing of applicable CERCLA long-term stewardship requirements and their planned and completed implementation goals. It proffers the Long-Term Stewardship Environmental Data Warehouse for Sitewide management of environmental data. This plan will be updated as needed over time, based on input from the U.S. Department of Energy, its cognizant subcontractors, and other local and regional stakeholders.

  14. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Federal Register requesting public comment on the draft National Public Health Action Plan for...

  15. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... requesting public comment on the draft National Public Health Action Plan for the Detection, Prevention,...

  16. Sandia National Laboratories Institutional Plan: FY 1999-2004

    SciTech Connect

    Garber, D.P.

    1999-01-06

    This Institutional Plan is the most comprehensive yearly "snapshot" available of Sandia National Laboratories' major programs, facilities, human resources, and budget. The document also includes overviews of our missions, organization, capabilities, planning functions, milestones, and accomplishments. The document's purpose is to provide the above information to the US Department of Energy, key congressional committees, Sandia management, and other present and potential customers. Chapter 2 presents information about Sandia's mission and summarizes our recent revision of Sandia's Strategic Plan. Chapter 3 presents an overview of Sandia's strategic objectives, chapter 4 lists laboratory goals and milestones for FY 1999, and chapter 5 presents our accomplishments during FY 1998. Chapters 3 through 5 are organized around our eight strategic objectives. The four primary objectives cover nuclear weapons responsibilities, nonproliferation and materials control, energy and critical infrastructures, and emerging national security threats. The major programmatic initiatives are presented in chapter 7. However, the programmatic descriptions in chapter 6 and the Associated funding tables in chapter 9 continue to be presented by DOE Budget and Reporting Code, as in previous Sandia institutional plans. As an aid to the reader, the four primary strategic objectives in chapter 3 are cross-referenced to the program information in chapter 6.

  17. Oak Ridge National Laboratory Institutional Plan FY 1984-FY 1989

    SciTech Connect

    Not Available

    1983-11-01

    In this plan, Oak Ridge National Laboratory (ORNL) continues to be committed to scientific and technological research that is based on technical excellence and innovation and that provides a foundation for and a stimulus to broader and more sustained economic growth. DOE is being asked to assist in establishing a new program for Laboratory cooperation with industry, beginning with an initial focus on materials science. The current Institutional Plan thus projects growth in the materials science area as well as in other basic physical science areas and suggests a new initiative designed to extend the various technology transfer activities and to make them more effective by using ORNL as the trial Laboratory for some of these different approaches. This Institutional Plan projects a stable future for ORNL, with only modest amounts of growth in selected areas of research for the FY 1984-FY 1989 planning cycle. Summaries of the overall picture of the proposed budget and personnel levels for the current planning cycle are included. Scientific programs, laboratory resource development, and private sector interactions are discussed.

  18. Oak Ridge National Laboratory Facilities Revitalization Project - Project Management Plan

    SciTech Connect

    Myrick, T.E.

    2000-06-06

    The Facilities Revitalization Project (FRP) has been established at Oak Ridge National Laboratory (ORNL) to provide new and/or refurbished research and support facilities for the Laboratory's science mission. The FRP vision is to provide ORNL staff with world-class facilities, consolidated at the X-10 site, with the first phase of construction to be completed within five years. The project will utilize a combination of U.S. Department of Energy (DOE), State of Tennessee, and private-sector funds to accomplish the new construction, with the facilities requirements to be focused on support of the ORNL Institutional Plan. This FRP Project Management Plan has been developed to provide the framework under which the project will be conducted. It is intended that the FRP will be managed as a programmatic office, with primary resources for execution of the project to be obtained from the responsible organizations within ORNL (Engineering, Procurement, Strategic Planning, etc.). The FRP Project Management Plan includes a definition of the project scope, the organizational responsibilities, and project approach, including detailed Work Breakdown Structure (WBS), followed by more detailed discussions of each of the main WBS elements: Project Planning Basis, Facility Deactivation and Consolidation, and New Facilities Development. Finally, a general discussion of the overall project schedule and cost tracking approach is provided.

  19. National Ignition Facility Quality Assurance Program Plan. Revision 1

    SciTech Connect

    Wolfe, C.R.; Yatabe, J.

    1996-09-01

    The National Ignition Facility (NIF) is a key constituent of the Department of Energy`s Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets, and will perform weapons physics and high-energy- density experiments in support of national security and civilian objectives. The NIF Project is a national facility involving the collaboration of several DOE laboratories and subcontractors, including Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), and the University of Rochester Laboratory for Laser Energetics (UR/LLE). The primary mission of the NIF Project is the construction and start-up operation of laser-based facilities that will demonstrate fusion ignition in the laboratory to provide nuclear-weapons-related physics data, and secondarily, to propagate fusion burn aimed at developing a potential source of civilian energy. To support the accomplishment of this very important mission, the LLNL Laser Directorate created the NIF Project Office to organize and bring about the Project. The NIF Project Office has established this Quality Assurance Program to ensure its success. This issue of the Quality Assurance Program Plan (QAPP) adds the requirements for the conduct of Title 11 design, construction, procurement, and Title III engineering. This QAPP defines and describes the program-the management system-for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of the Laboratory and the Laser Directorate.

  20. Argonne National Laboratory institutional plan FY 2002 - FY 2007.

    SciTech Connect

    Beggs, S. D.

    2001-11-29

    The national laboratory system provides a unique resource for addressing the national needs inherent in the mission of the Department of Energy. Argonne, which grew out of Enrico Fermi's pioneering work on the development of nuclear power, was the first national laboratory and, in many ways, has set the standard for those that followed. As the Laboratory's new director, I am pleased to present the Argonne National Laboratory Institutional Plan for FY 2002 through FY 2007 on behalf of the extraordinary group of scientists, engineers, technicians, administrators, and others who are responsible for the Laboratory's distinguished record of achievement. Like our sister DOE laboratories, Argonne uses a multifaceted approach to advance U.S. R and D priorities. First, we assemble interdisciplinary teams of scientists and engineers to address complex problems. For example, our initiative in Functional Genomics will bring together biologists, computer scientists, environmental scientists, and staff of the Advanced Photon Source to develop complete maps of cellular function. Second, we cultivate specific core competencies in science and technology; this Institutional Plan discusses the many ways in which our core competencies support DOE's four mission areas. Third, we serve the scientific community by designing, building, and operating world-class user facilities, such as the Advanced Photon Source, the Intense Pulsed Neutron Source, and the Argonne Tandem-Linac Accelerator System. This Plan summarizes the visions, missions, and strategic plans for the Laboratory's existing major user facilities, and it explains our approach to the planned Rare Isotope Accelerator. Fourth, we help develop the next generation of scientists and engineers through educational programs, many of which involve bright young people in research. This Plan summarizes our vision, objectives, and strategies in the education area, and it gives statistics on student and faculty participation. Finally, we

  1. 76 FR 27087 - Draft Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Park Service Draft Environmental Impact Statement for the Winter Use Plan, Yellowstone National... Draft Environmental Impact Statement (DEIS) for a Winter Use Plan for Yellowstone National Park, located..., Yellowstone National Park, P.O. Box 168, Yellowstone National Park, Wyoming 82190. If......

  2. 75 FR 28055 - General Management Plan; Joshua Tree National Park; San Bernardino and Riverside Counties, CA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... National Park Service General Management Plan; Joshua Tree National Park; San Bernardino and Riverside... Management Plan (GMP) for Joshua Tree National Park, California. The new GMP will update the overall..., Joshua Tree National Park, Joshua, 74485 National Park Drive, Twentynine Palms, California...

  3. NmF2 enhancement during ionospheric F2 region nighttime: A statistical analysis based on COSMIC observations during the 2007-2009 solar minimum

    NASA Astrophysics Data System (ADS)

    Chen, Yiding; Liu, Libo; Le, Huijun; Wan, Weixing; Zhang, Hui

    2015-11-01

    In this paper the global features of NmF2 enhancement occurring during ionospheric F2 region nighttime (the period when the sunlight is occulted by the Earth in the altitudinal range of ionospheric F2 region) and lasting for more than 2 h were investigated based on Constellation Observing System for Meteorology, Ionosphere, and Climate (COSMIC) measurements during the 2007-2009 solar minimum. This nighttime enhancement of NmF2 mainly appears at the latitudes with dips larger than 45° in the winter hemisphere in solstice seasons. The magnitude of NmF2 enhancement reaches latitudinal maxima (minima) at the geomagnetic latitudes of about 40°-50° (60°-70°), with larger magnitudes in the northern winter hemisphere than in the southern winter hemisphere. The longitudinal variation of nighttime enhancement is also evident; especially the magnitude of NmF2 enhancement shows a significant longitudinal modulation in the southern winter hemisphere. The controlling factors of the spatial variations of NmF2 nighttime enhancement were analyzed. The longitudinal variation of NmF2 nighttime enhancement is suggested to be related to the longitudinal differences in background NmF2, thermospheric density, and interhemispheric plasma transport, and the latitudinal variation of NmF2 nighttime enhancement is possibly related to the latitudinal variations of geomagnetic inclination and the plasma storage in the topside ionosphere and the plasmasphere. The configuration of the geomagnetic field plays an important role in the longitudinal and latitudinal variations of NmF2 nighttime enhancement.

  4. Monitoring of glacial seismic events from Greenland at regional distances: experience from the POLENET/LAPNET experiment during the IPY 2007-2009

    NASA Astrophysics Data System (ADS)

    Kozlovskaya, E.; Pedersen, H.; Plomerova, J.; Achauer, U.; Kissling, E. H.; Sanina, I.; Jämsen, T.; Silvennoinen, H.; Pequegnat, C.; Hurskainen, R.; Hausmann, H.; Jedlicka, P.; Aleshine, I.; Bourova, E.; Bodvarsson, R.; Brueckl, E. P.; Eken, T.; Heikkinen, P. J.; Houseman, G. A.; Johnsen, H.; Kari, K.; Munzarova, H.; Roberts, R.; Ruzek, B.; Hosein Shomali, Z.; Schweitzer, J.; Shaumyan, A.; Vecsey, L.; Volosov, S.

    2010-12-01

    Monitoring of glacial earthquakes from Greenland was one of the major targets of the POLENET/LAPNET passive seismic experiment in northern Fennoscandia (northern parts of Finland, Sweden, Norway and Russian Karelia) during the IPY 2007-2009. The POLENET/LAPNET array, with the average spacing between stations of 70 km, was designed to solve specific tasks of polar seismology. The collected POLENET/LAPNET dataset includes high-frequency continuous data (sampling rate from 50 to 100 sps) of 37 temporary stations, which were in operation during the time frame from 01.05.2008 to 31.09.2009, and of 21 stations of selected permanent networks in Fennoscandia. The first results of the experiment have shown that the POLENET/LAPNET array, located at regional distances from Greenland, recorded more such events than it has been recorded by the Global Seismographic Network during the same observation period. The waveforms of events recorded by the array differ from both long-period waveforms of glacial earthquakes recorded at teleseismic distances and from short-period glacial rumblings recorded at local distances. Recordings of glacial earthquakes obtained by the array contain the long-period energy only. In many cases the events were recorded in groups within the time interval of up to 1 hour. Generally, the waveforms of events within the same group are different and the events not always originate from the same location. For some of the events it was possible to recognize not only dispersed long-period surface wave, but also the first arrival of a long-period P-wave. This suggests that source duration of these events was long. Diversity of the waveforms of glacial events recorded by the POLENET/LAPNET array can be considered as evidence for diversity of source mechanisms of these events.

  5. Suicide and the Great Recession of 2007-2009: the role of economic factors in the 50 U.S. states.

    PubMed

    Phillips, Julie A; Nugent, Colleen N

    2014-09-01

    After several decades of decline, U.S. suicide rates have risen since 2005, a trend driven largely by increases among those aged 45-64 that began in 1999. A prominent explanation for this pattern relates to deteriorating economic conditions, especially the sharp rise in unemployment associated with the Great Recession of 2007-2009. We pool data from 1997 to 2010 on the 50 U.S. states to examine the role of economic factors in producing the recent rise in suicide rates. Unlike prior studies, we examine trends in the total suicide rate and in the rate disaggregated by sex, age group and time period and include a number of important confounding factors in a multivariate analysis. We find a strong positive association between unemployment rates and total suicide rates over time within states. The association appears stronger in states that had higher female labor force participation rates over the period, suggesting that the Great Recession may generate greater levels of anomie in this context. Once we consider contextual factors such as female labor force participation, we find that rising unemployment had a similar adverse effect on male and female suicide rates. A positive effect of unemployment on temporal variation in middle-aged suicide exists but not for other age groups. Other economic characteristics, such as percent of manufacturing jobs and per capita income, are not associated with temporal variation in suicide rates within states but are associated with variation between states in suicide rates. The findings suggest that the following may be important components of effective prevention strategies: 1) specifically targeting employers and workplaces as important stakeholders in the prevention of suicide, 2) disseminating information about health risks tied to un/employment, and 3) linking the unemployed to mental health resources. PMID:24973571

  6. 78 FR 12353 - Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... National Park Service Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National... the availability of a Final Supplemental Environmental Impact Statement (SEIS) for a Winter Use Plan... Protection Agency of the Notice of Availability of the Final Supplemental Environmental Impact...

  7. 78 FR 66283 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... requirements, Superfund, Water pollution control, Water supply. Dated: September 23, 2013. A. Stanley Meiburg.... 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  8. 76 FR 76336 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ... recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  9. 75 FR 55479 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ... documentation. The public comment period for the NOIDp was extended through August 16, 2010 (75 FR 42361). EPA..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Dated: September... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  10. 76 FR 51316 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  11. 77 FR 58321 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ..., Water pollution control, Water supply. Dated: August 27, 2012. Gwendolyn Keyes Fleming, Regional...)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  12. 76 FR 45484 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  13. 76 FR 50164 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp., p... AGENCY 40 CFR Part 300 National Oil and Hazardous Substance Pollution Contingency Plan...

  14. 77 FR 46009 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ..., Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p. 193. Dated... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  15. 75 FR 53268 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  16. 76 FR 41751 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ..., Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p. 193. Dated... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  17. 76 FR 70105 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ... recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3... AGENCY 40 CFR Part 300 National Oil and Hazardous Substance Pollution Contingency Plan...

  18. 76 FR 18136 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ..., Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p. 193. Dated... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  19. 76 FR 49397 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  20. 78 FR 47267 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  1. 76 FR 77457 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ..., Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp., p. 193. Dated... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  2. 78 FR 60809 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ..., Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp., p. 193. Dated... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  3. 76 FR 81904 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  4. 78 FR 11620 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... requirements, Superfund, Water pollution control, and Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan...

  5. 76 FR 45483 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  6. 77 FR 43567 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ... recordkeeping requirements, Superfund, Water pollution control, Water supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  7. 76 FR 45432 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ..., Superfund, Water pollution control, Water supply. Dated: July 22, 2011. Al Armendariz, Regional...(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan;...

  8. 76 FR 56294 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... of the direct final action (76 FR 41719) is effective as of September 13, 2011. ADDRESSES.... 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p. 193. Dated... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan...

  9. 76 FR 56362 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... Register. DATES: The proposed rule published on July 15, 2011 (76 FR 41751) is withdrawn as of September 13...-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p... AGENCY 40 CFR Part 300 National Oil and Hazardous Substances Pollution Contingency Plan...

  10. Evolving plans for the USA National Phenology Network

    USGS Publications Warehouse

    Betancourt, Julio L.; Schwartz, Mark D.; Breshears, David D.; Brewer, Carol A.; Frazer, Gary; Gross, John E.; Mazer, Susan J.; Reed, Bradley C.; Wilson, Bruce E.

    2007-01-01

    Phenology is the study of periodic plant and animal life cycle events, how these are influenced by seasonal and interannual variations in climate, and how they modulate the abundance, diversity, and interactions of organisms. The USA National Phenology Network (USA-NPN) is currently being organized to engage federal agencies, environmental networks and field stations, educational institutions, and citizen scientists. The first USA-NPN planning workshop was held August 2005, in Tucson, Ariz. (Betancourt et al. [2005]; http://www.uwm.edu/Dept/Geography/npn/; by 1 June 2007, also see http://www.usanpn.org). With sponsorship from the U.S. National Science Foundation, the U.S. Geological Survey (USGS), the U.S. Fish and Wildlife Service, and NASA, the second USA-NPN planning workshop was held at the University of Wisconsin-Milwaukee on 10–12 October 2006 to (1) develop lists of target species and observation protocols; (2) identify existing networks that could comprise the backbone of nationwide observations by 2008; (3) develop opportunities for education, citizen science, and outreach beginning in spring 2007; (4) design strategies for implementing the remote sensing component of USA-NPN; and (5) draft a data management and cyberinfrastructure plan.

  11. 75 FR 66718 - Helena National Forest; Montana; Blackfoot Travel Plan EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... Forest Service Helena National Forest; Montana; Blackfoot Travel Plan EIS AGENCY: Forest Service, USDA... the existing motorized public access routes and prohibitions within the Blackfoot travel planning area. Consistent with the Forest Service travel planning regulations, the resulting available public...

  12. Quinault Indian Nation Comprehensive Biomass Strategic Planning Project

    SciTech Connect

    Cardenas, Jesus

    2015-03-31

    The overall purposes of the Quinault Indian Nation’s Comprehensive Biomass Strategic Planning Project were to: (1) Identify and confirm community and tribal energy needs; (2) Conducting an inventory of sustainable biomass feedstock availability; (3) Development of a biomass energy vision statement with goals and objectives; (4) Identification and assessment of biomass options for both demand-side and supply side that are viable to the Quinault Indian Nation (QIN); and (5) Developing a long-term biomass strategy consistent with the long-term overall energy goals of the QIN. This Comprehensive Biomass Strategic Planning Project is consistent with the QIN’s prior two-year DOE Renewable Energy Study from 2004 through 2006. That study revealed that the most viable options to the QIN’s renewable energy options were biomass and energy efficiency best practices. QIN's Biomass Strategic Planning Project is focused on using forest slash in chipped form as feedstock for fuel pellet manufacturing in support of a tribal biomass heating facility. This biomass heating facility has been engineered and designed to heat existing tribal facilities as well as tribal facilities currently being planned including a new K-12 School.

  13. National Ignition Facility Risk Management Plan, Revision 2

    SciTech Connect

    Brereton, S J

    2002-06-01

    The National Ignition Facility (NIF) Risk Management Plan (LLNL, 1997a) was originally prepared in 1997 in accordance with the Department of Energy (DOE) Life Cycle Asset Management Good Practice Guide (DOE, 1996a) and supported NIF Critical Decision 3, approval to initiate construction (DOE, 1997a). The plan was updated in 1998 to reflect realized risks such as the finding and successful clean up of polychlorinated biphenyl (PCB)-filled electrical capacitors at the NIF excavation during initial construction and the litigation of the Programmatic Environmental Impact Statement for Stockpile Stewardship (DOE, 1996b) by a group of non-governmental organizations led by the Natural Resources Defense Council. The current update of the Risk Management Plan brings it into compliance with the applicable DOE Orders and Standards and addresses new risks, such as assuring safety during the period when construction, special equipment installation, and commissioning are occurring simultaneously at the NIF site, and the extensive use of models to manage technical performance risk. The objectives of the updated plan are to: (1) Identify the risks to the completion of the Project in terms of meeting performance and regulatory requirements, ES&H, cost, and schedule; (2) Assess or the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H, costs, and schedule; and (3) Address suitable risk mitigation measures for each identified risk.

  14. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  15. BROOKHAVEN NATIONAL LABORATORY INSTITUTIONAL PLAN FY2003-2007.

    SciTech Connect

    2003-06-10

    This document presents the vision for Brookhaven National Laboratory (BNL) for the next five years, and a roadmap for implementing that vision. Brookhaven is a multidisciplinary science-based laboratory operated for the U.S. Department of Energy (DOE), supported primarily by programs sponsored by the DOE's Office of Science. As the third-largest funding agency for science in the U.S., one of the DOE's goals is ''to advance basic research and the instruments of science that are the foundations for DOE's applied missions, a base for U.S. technology innovation, and a source of remarkable insights into our physical and biological world, and the nature of matter and energy'' (DOE Office of Science Strategic Plan, 2000 http://www.osti.gov/portfolio/science.htm). BNL shapes its vision according to this plan.

  16. National program plan for electric vehicle battery research and development

    SciTech Connect

    Henriksen, G.L.; Douglas, D.L.; Warde, C.J.; Douglas , Inc., Bloomington, MN; Warde Associates, Inc., Greensboro, NC )

    1989-08-01

    EVs offer the prospect of reducing US petroleum fuel usage and air pollution in major metropolitan areas. In 1987, DOE-EHP commissioned a two-phase study at INEL to produce a national plan for R D on battery technology -- the limiting component in EVs. The battery assessment phase identified the most-promising'' technologies from a comprehensive list of viable EV batteries. This multi-year R D program plan identifies development schedules, milestones, and tasks directed at resolving the critical technical and economic issues for the most-promising developmental batteries: bipolar lead/acid, flow-through lead/acid, iron/air, lithium/iron sulfide, nickel/iron, sodium/metal chloride, sodium/sulfur, zinc/air, and zinc/bromine. 8 refs., 1 fig., 6 tabs.

  17. National rf technology research and development program plan

    SciTech Connect

    Not Available

    1983-05-01

    This plan was prepared by the Oak Ridge National Laboratory at the request of the Office of Fusion Energy, Division of Development and Technology, to define the technology development needs and priorities. The US rf research and development community, with a wide representation from universities, laboratories and industries, participated in many discussions, meetings and in a three-day workshop in developing the needs and priorities definition. This very active and effective involvement of the rf leaders from all of these groups was an essential feature of the activity and results in the plan representing a broad consensus from the magnetic fusion energy development community. In addition, a number of scientists from Japan and Europe participated by providing data.

  18. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... the Preferred Alternative as Alternative 8, a one-year plan to allow oversnow vehicle use in the park... National Park Service Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park... the Final Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park....

  19. 76 FR 68503 - Ungulate Management Plan/Environmental Impact Statement, Great Sand Dunes National Park and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... National Park Service Ungulate Management Plan/Environmental Impact Statement, Great Sand Dunes National... Intent to prepare an Environmental Impact Statement for the Ungulate Management Plan, Great Sand Dunes... Ungulate Management Plan, Great Sand Dunes National Park and Preserve, Colorado. The purpose of this...

  20. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... National Park Service Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation... Impact Statement for the Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: Pursuant to...) is releasing a Draft Environmental Impact Statement for the Dog Management Plan (Draft...

  1. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... National Park Service Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone... Supplemental Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park. SUMMARY...) for a Winter Use Plan for Yellowstone National Park, located in Idaho, Montana and Wyoming. DATES:...

  2. 77 FR 53908 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... National Park Service Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone... (Draft SEIS) for a Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and Wyoming... 2012 Supplemental Winter Use Plan EIS), and at Yellowstone National Park headquarters, Mammoth...

  3. 75 FR 23222 - National Poultry Improvement Plan; General Conference Committee Meeting and 40th Biennial Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... Animal and Plant Health Inspection Service National Poultry Improvement Plan; General Conference... of the National Poultry Improvement Plan (NPIP) and the NPIP's 40th Biennial Conference. DATES: The.... Andrew R. Rhorer, Senior Coordinator, National Poultry Improvement Plan, VS, APHIS, 1498 Klondike...

  4. 77 FR 46374 - National Poultry Improvement Plan; General Conference Committee Meeting and 41st Biennial Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... Animal and Plant Health Inspection Service National Poultry Improvement Plan; General Conference... of the National Poultry Improvement Plan (NPIP) and the NPIP's 41st Biennial Conference. DATES: The..., National Poultry Improvement Plan, VS, APHIS, 1506 Klondike Road, Suite 300, Conyers, GA 30094-5173,...

  5. 77 FR 59888 - General Conference Committee of the National Poultry Improvement Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... National Poultry Improvement Plan AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Notice... to renew the charter of the General Conference Committee of the National Poultry Improvement Plan..., National Poultry Improvement Plan, VS, APHIS, USDA, 1506 Klondike Road, Suite 300, Conyers, GA 30094;...

  6. 76 FR 79708 - Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ...The National Park Service has prepared a Draft General Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan/DEIS evaluates four alternatives for updating the current approach to management in Golden Gate National Recreation Area (GGNRA) and Muir Woods National Monument. The original Notice of Availability (published in the Federal Register on September 12, 2011) announced a......

  7. 78 FR 65962 - Revision of the Land Management Plan for the Flathead National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... Flathead National Forest. SUMMARY: The Flathead National Forest, located in Montana, is initiating the forest planning process pursuant to the 2012 Forest Planning Rule. This process results in a Forest Land... Forest Service Revision of the Land Management Plan for the Flathead National Forest AGENCY:...

  8. 76 FR 44495 - A National Broadband Plan for Our Future; Petition for Reconsideration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... COMMISSION 47 CFR Chapter I A National Broadband Plan for Our Future; Petition for Reconsideration AGENCY... proceeding concerning a ] national broadband plan for our future and published pursuant to 47 CFR 1.429(e... Matter of Implementation of Section 224 of the Act (WC Docket No. 07-245); A National Broadband Plan...

  9. 78 FR 16296 - Record of Decision for the Coral Reef Restoration Plan, Biscayne National Park, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... National Park Service Record of Decision for the Coral Reef Restoration Plan, Biscayne National Park, FL... the availability of the Record of Decision (ROD) for the Coral Reef Restoration Plan (Plan) for... occur annually in Biscayne National Park, causing injuries to submerged resources. The goal of...

  10. 78 FR 7391 - Motorized Travel Management Plan, Tonto National Forest; Gila, Maricopa, Pinal, and Counties, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... Forest Service Motorized Travel Management Plan, Tonto National Forest; Gila, Maricopa, Pinal, and... developing a motorized travel management plan. Such a plan is needed to meet National travel management... lands. This notice describes the components to be included in the motorized travel plan, proposed...

  11. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... General Management Plan for Monocacy National Battlefield. The plan will provide guidance to park... National Park Service Final Environmental Impact Statement for the General Management Plan; Monocacy... Availability of the Final Environmental Impact Statement for the General Management Plan for Monocacy...

  12. 78 FR 5494 - Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... National Park Service Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith...- Road Vehicle Management Plan (Plan), Lake Meredith National Recreation Area (LAMR), Texas. The Plan/DEIS evaluates the impacts of four alternatives that address off-road vehicle (ORV) management in...

  13. Sandia National Laboratories Institutional Plan: FY 1996--2001

    SciTech Connect

    1995-12-31

    Sandia`s Institutional Plan is by necessity a large document. As their missions have grown and diversified over the past decades, the variety of technical and site activities has increased. The programs and activities described here cover an enormous breadth of scientific and technological effort--from the creation of new materials to the development of a Sandia-wide electronic communications system. Today, there are three major themes that greatly influence this work. First, every federally funded institution is being challenged to find ways to become more cost effective, as the US seeks to reduce the deficit and achieve a balanced federal spending plan. Sandia is evaluating its business and operational processes to reduce the overall costs. Second, in response to the Galvin Task Force`s report ``Alternative Futures for the Department of Energy National Laboratories``, Sandia and the Department of Energy are working jointly to reduce the burden of administrative and compliance activities in order to devote more of the total effort to their principal research and development missions. Third, they are reevaluating the match between their missions and the programs they will emphasize in the future. They must demonstrate that Sandia`s roles--in national security, energy security, environmental integrity, and national scientific and technology agenda support--fit their special capabilities and skills and thus ensure their place in these missions for the longer planning horizon. The following areas are covered here: Sandia`s mission; laboratory directives; programmatic activities; technology partnerships and commercialization; Sandia`s resources; and protecting resources and the community.

  14. Dr. Haryono Suyono, National Family Planning Coordinating Board, Indonesia.

    PubMed

    1986-11-01

    The goal of the Indonesian family planning program has been to institutionalize both the concept and the norm of a small, happy and prosperous family in a manner that is acceptable to all. To this end, a larger role for the private sector in family planning (FP) has been promoted. While the government program has been very effective in the villages, it was not as effective in the urban areas where there are more diverse populations. Several meetings were held to develop a strategy for FP programs in the urban areas involving both the nongovernment organizations (NGOs) and commercial enterprises. It was agreed that several model programs would be developed through the NGOs with funds coming from both international health organizations and the National Family Planning Coordinating Board. It was hoped that the NGOs would develop into self-sufficient organizations. 1 urban activity that has just started is a specially designed social marketing project aimed at increasing the involvement and commitment of males through a condom distribution scheme. Another promising development is the shifting of the management and implementation of FP programs from the government to the community itself. A primary emphasis is to activate the private sector to expand its role in providing FP information and services. The overall strategy is to create a climate that will make it easier for people to increase their role in family planning service delivery and acceptance through mobilization of resources, funds, facilities and infrastructure so that acceptors will gradually pay for family planning services by themselves according to their needs. PMID:12314467

  15. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  16. 77 FR 24979 - Plan of Operations, Environmental Assessment, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... National Park Service Plan of Operations, Environmental Assessment, Big Thicket National Preserve, Texas... Corridor, Lower Neches River Corridor, and Village Creek Corridor Units of Big Thicket National Preserve..., Big Thicket National Preserve, 6044 FM 420, Kountze, Texas 77625. Copies of the Plan of Operations...

  17. 75 FR 47826 - Final General Management Plan/Environmental Impact Statement, Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... National Park Service Final General Management Plan/Environmental Impact Statement, Cumberland Gap National... Management Plan and Environmental Impact Statement for the Cumberland Gap National Historical Park, Kentucky... Cumberland Gap National Historical Park, the Final GMP/EIS describes the NPS preferred...

  18. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... National Park Service Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone..., Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of the National Environmental Policy Act of... announces the availability of the Record of Decision for the Winter Use Plan for Yellowstone National......

  19. Oak Ridge National Laboratory Waste Management Plan. Revision 1

    SciTech Connect

    Forgy, Jr., J. R.

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  20. Oak Ridge National Laboratory Waste Management Plan. Rev. 1

    SciTech Connect

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  1. National Program Plan Fuel Cells in Transportation. Executive Summary

    SciTech Connect

    Not Available

    1993-02-01

    Fuel cells are being developed for application in the transportation sector because they will convert hydrogen to electric power at high efficiencies with virtually no detrimental environmental impact. To realize these energy, environmental, and economic benefits, developers of FCVs need to (1) reduce the size and weight of current designs, (2) develop fuel cell propulsion systems with rapid start-up and greater load-following capability, (3) reduce system cost and/or improve performance, and (4) utilize alternative fuels to a large extent. This Plan addresses the FCV-related requirements of the Energy Act, describing a development program for light- and heavy-duty propulsion systems, a basic R&D program on fuel cell technology that is separate from, but feeds into, the system development activities, and supporting analyses. Implementation of the Program Plan by means of industry/government alliances will accelerate the commercialization of FCVs. In the long term, the successful deployment of large numbers of FCVs promises to eliminate the transportation sector as a major contributor to the nation`s environmental problems.

  2. National Energy Audit Tool for Multifamily Buildings Development Plan

    SciTech Connect

    Malhotra, Mini; MacDonald, Michael; Accawi, Gina K; New, Joshua Ryan; Im, Piljae

    2012-03-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program (WAP) enables low-income families to reduce their energy costs by providing funds to make their homes more energy efficient. In addition, the program funds Weatherization Training and Technical Assistance (T and TA) activities to support a range of program operations. These activities include measuring and documenting performance, monitoring programs, promoting advanced techniques and collaborations to further improve program effectiveness, and training, including developing tools and information resources. The T and TA plan outlines the tasks, activities, and milestones to support the weatherization network with the program implementation ramp up efforts. Weatherization of multifamily buildings has been recognized as an effective way to ramp up weatherization efforts. To support this effort, the 2009 National Weatherization T and TA plan includes the task of expanding the functionality of the Weatherization Assistant, a DOE-sponsored family of energy audit computer programs, to perform audits for large and small multifamily buildings This report describes the planning effort for a new multifamily energy audit tool for DOE's WAP. The functionality of the Weatherization Assistant is being expanded to also perform energy audits of small multifamily and large multifamily buildings. The process covers an assessment of needs that includes input from national experts during two national Web conferences. The assessment of needs is then translated into capability and performance descriptions for the proposed new multifamily energy audit, with some description of what might or should be provided in the new tool. The assessment of needs is combined with our best judgment to lay out a strategy for development of the multifamily tool that proceeds in stages, with features of an initial tool (version 1) and a more capable version 2 handled with currently available resources. Additional development in the

  3. Emergency medical planning for the 2000 Republican National Convention.

    PubMed

    Mechem, C C; Hare, S; Hvisdas, R; Berg, D M; Halper, R; Cola, L A

    2001-01-01

    Planning for emergency medical services (EMS) coverage for the 2000 Republican National Convention in Philadelphia was a complex process that involved the cooperation of municipal, state, and federal agencies as well as local hospitals. The medical needs of the delegates, members of the media, and support personnel at the convention venue had to be met. Contingency plans for the possibility of large, organized political protests and associated injuries had to be developed. Steps had to be taken to ensure the safety of emergency personnel who may have to respond to such incidents. Because of the heightened threat of terrorist attacks on civilian populations in recent years, specialized training and material to respond to such incidents were required. The important role that local hospitals may play in providing care to victims of a large, multicasualty incident, especially one involving weapons of mass destruction, was recognized. Therefore, steps were taken to increase the awareness of hospital staff to patient decontamination and isolation techniques as well as specific therapies for the chemical, biological, and radioactive agents that terrorists might use. Finally, despite the focus placed on the convention, the day-to-day emergency medical needs of the citizens of Philadelphia had to be met. Through careful planning, flexibility, and cooperation, it was possible to successfully address all of these issues. PMID:11642583

  4. National Science Foundation Postdoctoral Research Mentoring Plan Requirement

    NASA Astrophysics Data System (ADS)

    Lehr, Dana

    2010-01-01

    The National Science Foundation (NSF) Grant Proposal Guide (NSF 09-29) contains new guidance regarding compliance with the mentoring requirement of the America COMPETES Act. NSF Program Staff will review the Postdoctoral Researcher Mentoring Plan Requirement with regard to NSF proposal submissions. Each NSF proposal that requests funding to support postdoctoral researchers must include, as a supplementary document, a description of the mentoring activities that will be provided for such individuals. In no more than one page, the mentoring plan must describe the mentoring that will be provided to all postdoctoral researchers supported by the project, irrespective of whether they reside at the submitting organization, any subawardee organization, or at any organization participating in a simultaneously submitted collaborative project. Examples of mentoring activities include, but are not limited to: career counseling; training in preparation of grant proposals, publications and presentations; guidance on ways to improve teaching and mentoring skills; guidance on how to effectively collaborate with researchers from diverse backgrounds and disciplinary areas; and training in responsible professional practices. The proposed mentoring activities will be evaluated as part of the merit review process under the Foundation's broader impacts merit review criterion. Proposals that include funding to support postdoctoral researchers, and, do not include the requisite mentoring plan will be returned without review.

  5. National action plan to combat multidrug-resistant tuberculosis.

    PubMed

    1992-06-19

    At no time in recent history has tuberculosis (TB) been as great a concern as it is today. TB cases are on the increase, and the most serious aspect of the problem is the recent occurrence of outbreaks of multidrug-resistant (MDR) TB, which pose an urgent public health problem and require rapid intervention. A Task Force composed of representatives of many federal agencies has developed a National Action Plan for addressing this problem. The Task Force identified a number of objectives to be met if MDR-TB is to be successfully combatted. These objectives fall under the categories of a) surveillance and epidemiology--determining the magnitude and nature of the problem; b) laboratory diagnosis--improving the rapidity, sensitivity, and reliability of diagnostic methods for MDR-TB; c) patient management--effectively managing patients who have MDR-TB and preventing patients with drug-susceptible TB from developing drug-resistant disease; d) screening and preventive therapy--identifying persons who are infected with or at risk of developing MDR-TB and preventing them from developing clinically active TB; e) infection control--minimizing the risk of transmission of MDR-TB to patients, workers, and others in institutional settings; f) outbreak control; g) program evaluation--ensuring that TB programs are effective in managing patients and preventing MDR-TB; h) information dissemination/training and education; and i) research to provide new, more effective tools with which to combat MDR-TB. The Action Plan lays out a series of activities to be undertaken at the national level. For each category, the Plan presents statements of problems to be overcome, followed by a summary of the objective to be achieved and steps to be carried out. For each implementation step, responsibility is assigned to the appropriate organization and start-up dates are listed. PMID:1640920

  6. 78 FR 60937 - Joint Industry Plan; Order Approving the Fifth Amendment to the National Market System Plan to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... COMMISSION Joint Industry Plan; Order Approving the Fifth Amendment to the National Market System Plan to Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y-Exchange, Inc., Chicago Board... Market LLC, National Stock Exchange, Inc., New York Stock Exchange LLC, NYSE MKT LLC, and NYSE Arca,...

  7. Applying national survey results for strategic planning and program improvement: the National Diabetes Education Program.

    PubMed

    Griffey, Susan; Piccinino, Linda; Gallivan, Joanne; Lotenberg, Lynne Doner; Tuncer, Diane

    2015-02-01

    Since the 1970s, the federal government has spearheaded major national education programs to reduce the burden of chronic diseases in the United States. These prevention and disease management programs communicate critical information to the public, those affected by the disease, and health care providers. The National Diabetes Education Program (NDEP), the leading federal program on diabetes sponsored by the National Institutes of Health (NIH) and the Centers for Disease Control and Prevention (CDC), uses primary and secondary quantitative data and qualitative audience research to guide program planning and evaluation. Since 2006, the NDEP has filled the gaps in existing quantitative data sources by conducting its own population-based survey, the NDEP National Diabetes Survey (NNDS). The NNDS is conducted every 2–3 years and tracks changes in knowledge, attitudes and practice indicators in key target audiences. This article describes how the NDEP has used the NNDS as a key component of its evaluation framework and how it applies the survey results for strategic planning and program improvement. The NDEP's use of the NNDS illustrates how a program evaluation framework that includes periodic population-based surveys can serve as an evaluation model for similar national health education programs. PMID:25463016

  8. Local Solutions for National Challenges? Exploring Local Solutions through the Case of a National Succession Planning Strategy

    ERIC Educational Resources Information Center

    Collins, Mike

    2013-01-01

    The notion of localism and decentralization in national policy has come increasingly to the fore in recent years. The national succession planning strategy for headteachers in England introduced by the National College for School Leadership promoted "local solutions for a national challenge". This article deals with some aspects of the…

  9. Idaho National Engineering Laboratory analytical services performance evaluation plan

    SciTech Connect

    Connolly, J.M.; Sailer, S.J.; Anderson, D.A.

    1994-03-01

    The Idaho National Engineering Laboratory`s (INEL`s) Sample Management Office (SMO) conducts a Performance Evaluation Program that ensures that data of known quality are supplied by the analytical. chemistry service organizations with which the INEL contracts. The Analytical Services Performance Evaluation Plan documents the routine monitoring and assessment of suppliers conducted by the SMO, and it describes the procedures that are followed to ensure that suppliers meet all appropriate requirements. Because high-quality analytical support is vital to the success of DOE Environmental Management programs at the INEL, the performance of organizations providing these services must be routinely monitored and assessed. Analytical disciplines for which performance is monitored include metals, organics, radiochemical, and miscellaneous classical analysis methods.

  10. 76 FR 41516 - Vegetation and Deer Management Plan/Environmental Impact Statement, Morristown National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... National Park Service Vegetation and Deer Management Plan/Environmental Impact Statement, Morristown...: Notice of Intent to prepare an Environmental Impact Statement for a Vegetation and Deer Management Plan... Statement (EIS) for a Vegetation and Deer Management Plan at Morristown National Historical Park (NHP),...

  11. 78 FR 55093 - Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ... National Park Service Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate... Statement for the Dog Management Plan (Plan/SEIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in the park is based on a number of factors. Areas included in the GGNRA...

  12. 78 FR 69814 - Revision of the Land Management Plan for El Yunque National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ...El Yunque National Forest, located in Puerto Rico, is initiating the development of a land management plan revision (forest plan) for El Yunque National Forest (NF). A Draft Assessment is being posted to our Web site. We are inviting the public to help us develop a preliminary ``need for change'' and a proposed action for the land management plan...

  13. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... types of visitor use have changed, the Comprehensive Everglades Restoration Plan was approved, and in... National Park Service Draft Environmental Impact Statement for General Management Plan, Everglades National...) for the General Management Plan (GMP) and East Everglades Wilderness Study (EEWS) for...

  14. 75 FR 21221 - Plan Revision for Kaibab National Forest; Coconino, Yavapai, and Mojave Counties; AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ...As directed by the National Forest Management Act (NFMA), the USDA Forest Service is revising the Kaibab National Forest Land Management Plan (forest plan) and will also prepare an environmental impact statement (EIS) for the revised forest plan. This notice briefly describes the nature of the decision to be made, the proposed action and need for change, and information concerning public......

  15. 76 FR 35467 - Deer and Vegetation Management Plan/Environmental Impact Statement, Fire Island National Seashore...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... National Park Service Deer and Vegetation Management Plan/Environmental Impact Statement, Fire Island... Intent to prepare an Environmental Impact Statement for a Deer and Vegetation Management Plan, Fire...) for a Deer and Vegetation Management Plan at Fire Island National Seashore, New York. The purpose...

  16. 78 FR 42051 - Proposed Revision of the Corporation for National and Community Service Strategic Plan; Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... Strategic Plan; Request for Input AGENCY: Corporation for National and Community Service (CNCS). ACTION: Request for Input on Proposed Update of the CNCS Strategic Plan. SUMMARY: The Corporation for National and... comments. The goal of this public comment process is solicit input on CNCS's updated Strategic Plan...

  17. An Evaluation of the Effectiveness of National Park Service Interpretive Planning

    ERIC Educational Resources Information Center

    Wells, Marcella

    2008-01-01

    In 2005-2006, the National Park Service Office of Interpretive Planning at Harpers Ferry Center, in collaboration with the author, conducted an evaluation project to (a) assess the appropriateness and quality of specific elements of National Park Service (NPS) interpretive plans, (b) determine where improvements in planning might be made, and (c)…

  18. Acadia National Park Climate Change Scenario Planning Workshop summary

    USGS Publications Warehouse

    Star, Jonathan; Fisichelli, Nicholas; Bryan, Alexander; Babson, Amanda; Cole-Will, Rebecca; Miller-Rushing, Abraham J.

    2016-01-01

    This report summarizes outcomes from a two-day scenario planning workshop for Acadia National Park, Maine (ACAD). The primary objective of the workshop was to help ACAD senior leadership make management and planning decisions based on up-to-date climate science and assessments of future uncertainty. The workshop was also designed as a training program, helping build participants' capabilities to develop and use scenarios. The details of the workshop are given in later sections. The climate scenarios presented here are based on published global climate model output. The scenario implications for resources and management decisions are based on expert knowledge distilled through scientist-manager interaction during workgroup break-out sessions at the workshop. Thus, the descriptions below are from these small-group discussions in a workshop setting and should not be taken as vetted research statements of responses to the climate scenarios, but rather as insights and examinations of possible futures (Martin et al. 2011, McBride et al. 2012).

  19. Superfund cost recovery through national contingency plan compliance

    SciTech Connect

    Mundell, J.A.; Wightman, A.

    1994-12-31

    The National Oil and Hazardous Substances Pollution Contingency Plan (``NCP``), codified at 40 C.F.R. pt. 300, was first promulgated by the US EPA on July 16, 1982 (the ``1982 NCP``). Required by section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, or CERCLA, and by section 311 of the Clean Water Act (CWA), the NCP ``establish[es] procedures and standards for responding to releases of hazardous substances`` at Superfund sites. The purpose of the NCP ``is to give some consistency and cohesiveness to response planning and actions``. The primary goal of the NCP is to mitigate damage to the environment and protect the public health at the least possible expense. Within this framework, the NCP allows for the evaluation and clean-up activities at a Superfund site to be led directly by the US EPA, the designated state regulatory agency or, under monitoring, by private parties who are potentially responsible for the site contamination. This paper addresses NCP consistency review from both a technical and legal standpoint. The authors will first address the regulatory standards and process for evaluating private party NCP compliance, and then review common legal attacks on NCP compliance that bar the recovery of clean-up costs.

  20. National Aeronautics and Space Administration. 2003 Strategic Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    As the 21st century begins to unfold, NASA will focus, with renewed vigor, on the challenges and opportunities before us and on developing the unique capabilities that strengthen America and address our national needs. Our Mission is driven by science, exploration, and discovery, and it will be carried out with a firm commitment to fiscal responsibility. We will study climate change and the natural and human-induced hazards to Earth's ecosystem. We will help to counter the threat of international terrorism by developing technologies that can improve the security and safety of our air transportation system. We will lead the world into a new understanding of our planet, our solar system, and the universe around us, and in so doing, we will begin to understand whether life may have developed elsewhere in the cosmos. This strategic plan lays out our hopes for the future and the important things we seek to accomplish for America. We are privileged to be entrusted with these pursuits and thrilled to be able to carry them out. We invite you to join us on this great adventure. Releasing this strategic plan with our 2004 budget request represents our new commitment to the integration of budget and performance reporting. In this way, we will ensure that strategic priorities are aligned with and influence budget priorities. Our new Integrated Budget and Performance Document, a companion volume to this strategic plan, expands on the goals and objectives presented here and identifies the specific long-term and annual performance measures for which we will be held accountable.

  1. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... National Historic Site, North Carolina AGENCY: National Park Service, Interior. ACTION: Notice of... Management Plan (EIS/GMP) for Fort Raleigh National Historic Site, North Carolina. The draft describes and... Superintendent, Fort Raleigh National Historic Site, 1401 National Park Drive, Manteo, NC 27954. Via...

  2. 78 FR 38072 - General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... National Park Service General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains... Plan, Guadalupe Mountains National Park, Texas. DATES: The NPS will execute a Record of Decision no... CONTACT: Dennis A. V squez, Superintendent, Guadalupe Mountains National Park, HC 60, Box 400, Salt...

  3. 77 FR 42257 - General Conference Committee of the National Poultry Improvement Plan; Solicitation for Membership

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... Animal and Plant Health Inspection Service General Conference Committee of the National Poultry... National Poultry Improvement Plan. DATES: Consideration will be given to nominations received on or before..., National Poultry Improvement Plan, VS, APHIS, 1506 Klondike Road, Suite 300, Conyers, GA 30094-5173,...

  4. 75 FR 70712 - General Conference Committee of the National Poultry Improvement Plan; Reestablishment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... Animal and Plant Health Inspection Service General Conference Committee of the National Poultry... Conference Committee of the National Poultry Improvement Plan (Committee) for a 2-year period. The Secretary... INFORMATION CONTACT: Mr. Andrew R. Rhorer, Senior Coordinator, National Poultry Improvement Plan, VS,...

  5. 76 FR 1592 - National Poultry Improvement Plan; General Conference Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Animal and Plant Health Inspection Service National Poultry Improvement Plan; General Conference.... SUMMARY: We are giving notice of a meeting of the General Conference Committee of the National Poultry..., Senior Coordinator, National Poultry Improvement Plan, VS, APHIS, 1498 Klondike Road, Suite 101,...

  6. 30 CFR 756.14 - Approval of amendments to the Navajo Nation's abandoned mine land plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of amendments to the Navajo Nation's... PROGRAMS § 756.14 Approval of amendments to the Navajo Nation's abandoned mine land plan. (a) Revisions to the following provisions of the Navajo Nation AMLR plan, as submitted to OSM on April 7 and 22,...

  7. 30 CFR 756.14 - Approval of amendments to the Navajo Nation's abandoned mine land plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of amendments to the Navajo Nation's... PROGRAMS § 756.14 Approval of amendments to the Navajo Nation's abandoned mine land plan. (a) Revisions to the following provisions of the Navajo Nation AMLR plan, as submitted to OSM on April 7 and 22,...

  8. 78 FR 13376 - Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... National Park Service Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah... regulations, the National Park Service (NPS) is preparing a Chronic Wasting Disease Management Plan and... National Park and, should the disease become established, to slow the spread of the disease. To ensure...

  9. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... federal agencies, and other stakeholders. The draft plan is comprised of eight action plans (education and... National Oceanic and Atmospheric Administration Draft Management Plan and Environmental Assessment for... public comment on the draft management plan and draft environmental assessment for Monitor...

  10. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SECURITY FUTURES Regulation Nms-Regulation of the National Market System § 242.608 Filing and amendment of... market system plan shall ensure that a current and complete version of the plan is posted on a plan Web site or on a Web site designated by plan participants within two business days after notification...

  11. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... QUALITY National Ocean Council; Strategic Action Plan Content Outlines AGENCY: Council on Environmental Quality. ACTION: Notice of Availability, Strategic Action Plan Content Outlines; Request for Comments... priority objectives. As a first step, Federal interagency writing teams have developed content outlines...

  12. 75 FR 417 - National Protection and Programs Directorate; Statewide Communication Interoperability Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... SECURITY National Protection and Programs Directorate; Statewide Communication Interoperability Plan...: Statewide Communication Interoperability Plan Implementation Report. Form: Not Applicable. OMB Number: 1670... Emergency Communications Grant Program (IECGP) (6 U.S.C. 579) comply with the Statewide...

  13. 75 FR 21011 - National Protection and Programs Directorate; Statewide Communication Interoperability Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... SECURITY National Protection and Programs Directorate; Statewide Communication Interoperability Plan... concerning New Information Collection Request, Statewide Communication Interoperability Plan Implementation... January 5, 2010, at 75 FR 417, for a 60-day public comment period. DHS received no comments. The...

  14. 78 FR 47003 - Draft National Spatial Data Infrastructure Strategic Plan; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR U.S. Geological Survey Draft National Spatial Data Infrastructure Strategic Plan; Comment Request... Spatial Data Infrastructure (NSDI). The draft strategic plan, along with instructions for...

  15. 75 FR 11505 - Revision of Land and Resource Management Plan for the National Forests in Mississippi

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ...As directed by the National Forest Management Act, the USDA Forest Service is preparing the National Forests in Mississippi (NFsMS) revised land management plan (Forest Plan) and will also prepare an environmental impact statement (EIS) for this revised plan. This notice briefly describes the background history of NFsMS plan revision process to date, the nature of the decision to be made, the......

  16. [From national strategic plans to operational implementation: opportunities and risks].

    PubMed

    Etchepare, M

    2013-01-01

    Currently, all countries in Africa are - to various degrees - involved in reform and planning programs, either because they chose to or at the behest of international institutions working with them. Here we present an operational definition of a strategic plan and then analyze the factors that promote and constrain the planning process and the implementation of the plan thus developed. PMID:24446135

  17. Family planning in developing nations: a global concern, our concern.

    PubMed

    Harriman, L

    1984-01-01

    Rapid population growth is a serious problem in many developing countries and family planning policies developed in response to the problem raise many ethical issues; home economists can help the citizens in their respective countries increase their knowledge of population dynamics and help them assess the ethical implications of population and family planning policies. Most developing countries have high population growth rates. The annual population growth rates for 1975-79 were 2.8% for Africa, 2.6% for Latin America, and 2.1% for Asia. Population grows exponentially: a population growing at an annual rate of 3% increases. 1900% in a century. If current population trends continue the world's population will stablize toward the end of the 21st century at about 10 billion persons, compared to the world's present population of 4.3 billion. Rapid population growth not only threatens the future welfare of society as a whole, but currently impedes the economic development of the world's poorest nations. Consequently, the governments in many developing countries have adopted vigorous family planning programs. It is difficult to reduce population growth in developing countries because these countries have a high proportion of young people in their populations, i.e., a high number of persons of reproductive age. Barriers to family planning acceptance include 1) high illiteracy rates 2) high infant mortality rates 3) the high economic and socialvalue placed on children in developing countries and 4)religious beliefs. Methods used by governments to alter population growth include 1) manipulating access to contraceptives, 2)developing programs to alter social determinants of fertility, 3) using propaganda to encourage or discourage birth control and repressing information contrary to the government's policies, 4) offering incentives to those who further government policies and imposing disincentives on those who do not comply with government policies, and 5) exerting

  18. Y-12 National Security Complex National Historic Preservation Act Historic Preservation Plan

    SciTech Connect

    2003-09-30

    The Historic Preservation Plan (HPP) recognizes that the Y-12 National Security Complex is a vital and long-term component of DOE and NNSA. In addition to NNSA missions, the Office of Science and Energy, the Office of Nuclear Energy, and the Office of Environmental Management have properties located at Y-12 that must be taken into consideration. The HPP also recognizes that the challenge for cultural resource management is incorporating the requirements of NNSA, SC, NE, and EM missions while preserving and protecting its historic resources. The HPP seeks to find an effective way to meet the obligations at Y-12 for historic and archeological protection while at the same time facilitating effective completion of ongoing site mission activities, including removal of obsolete or contaminated facilities, adaptive reuse of existing facilities whenever feasible, and construction of new facilities in order to meet site mission needs. The Y-12 Historic Preservation Plan (HPP) defines the preservation strategy for the Y-12 National Security Complex and will direct efficient compliance with the NHPA and federal archaeological protection legislation at Y-12 as DOE and NNSA continues mission activities of the site.

  19. Waste reduction plan for The Oak Ridge National Laboratory

    SciTech Connect

    Schultz, R.M.

    1990-04-01

    The Oak Ridge National Laboratory (ORNL) is a multipurpose Research and Development (R D) facility. These R D activities generate numerous small waste streams. Waste minimization is defined as any action that minimizes the volume or toxicity of waste by avoiding its generation or recycling. This is accomplished by material substitution, changes to processes, or recycling wastes for reuse. Waste reduction is defined as waste minimization plus treatment which results in volume or toxicity reduction. The ORNL Waste Reduction Program will include both waste minimization and waste reduction efforts. Federal regulations, DOE policies and guidelines, increased costs and liabilities associated with the management of wastes, limited disposal options and facility capacities, and public consciousness have been motivating factors for implementing comprehensive waste reduction programs. DOE Order 5820.2A, Section 3.c.2.4 requires DOE facilities to establish an auditable waste reduction program for all LLW generators. In addition, it further states that any new facilities, or changes to existing facilities, incorporate waste minimization into design considerations. A more recent DOE Order, 3400.1, Section 4.b, requires the preparation of a waste reduction program plan which must be reviewed annually and updated every three years. Implementation of a waste minimization program for hazardous and radioactive mixed wastes is sited in DOE Order 5400.3, Section 7.d.5. This document has been prepared to address these requirements. 6 refs., 1 fig., 2 tabs.

  20. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... Recreation Area and Alibates Flint Quarries National Monument, Texas AGENCY: National Park Service, Interior... Impact Statement for the General Management Plan, Lake Meredith National Recreation Area and Alibates... National Recreation Area, P.O. Box 1460, Fritch, TX 79036; or call 806-857-0309. SUPPLEMENTARY...

  1. 76 FR 8479 - National Forest System Land Management Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... transition provisions to be in effect until a new planning rule is issued (74 FR 67062). While the 2000... rulemaking; request for comment. SUMMARY: The U.S. Department of Agriculture is proposing a new planning rule... Forest Service to adapt management to changing conditions and to improve plans based on new...

  2. 36 CFR 221.3 - Disposal of national forest timber according to management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Disposal of national forest timber according to management plans. 221.3 Section 221.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE TIMBER MANAGEMENT PLANNING § 221.3 Disposal of national forest...

  3. 36 CFR 221.3 - Disposal of national forest timber according to management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Disposal of national forest timber according to management plans. 221.3 Section 221.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE TIMBER MANAGEMENT PLANNING § 221.3 Disposal of national forest...

  4. 36 CFR 221.3 - Disposal of national forest timber according to management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Disposal of national forest timber according to management plans. 221.3 Section 221.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE TIMBER MANAGEMENT PLANNING § 221.3 Disposal of national forest...

  5. 36 CFR 221.3 - Disposal of national forest timber according to management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Disposal of national forest timber according to management plans. 221.3 Section 221.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE TIMBER MANAGEMENT PLANNING § 221.3 Disposal of national forest...

  6. 36 CFR 221.3 - Disposal of national forest timber according to management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Disposal of national forest timber according to management plans. 221.3 Section 221.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE TIMBER MANAGEMENT PLANNING § 221.3 Disposal of national forest...

  7. 78 FR 33799 - National Poultry Improvement Plan; General Conference Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... Animal and Plant Health Inspection Service National Poultry Improvement Plan; General Conference.... SUMMARY: We are giving notice of a meeting of the General Conference Committee of the National Poultry... Poultry Improvement Plan, VS, APHIS, 1506 Klondike Road, Suite 101, Conyers, GA 30094; (770)...

  8. 76 FR 62758 - Wallowa-Whitman and Umatilla National Forests, Oregon Granite Creek Watershed Mining Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ...The USDA, Forest Service will prepare an environmental impact statement to authorize the approval of mining Plans of Operation in the Granite Creek Watershed Mining Plans analysis area on the Whitman Ranger District of the Wallowa-Whitman National Forest, and the North Fork John Day Ranger District of the Umatilla National Forest. Both forests had previously initiated environmental analyses......

  9. 78 FR 34112 - Review and Revision of the National Infrastructure Protection Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... cybersecurity in securing physical assets. \\2\\ EO 13636 can be found at: http://www.gpo.gov/fdsys/pkg/FR-2013-02... SECURITY Review and Revision of the National Infrastructure Protection Plan AGENCY: National Protection and... Plan (NIPP) to conform to the requirements of Presidential Policy Directive 21, Critical...

  10. 75 FR 52357 - Request for Comment: National Center for Complementary and Alternative Medicine Draft Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-25

    ... Alternative Medicine Draft Strategic Plan ACTION: Notice. SUMMARY: The National Center for Complementary and Alternative Medicine (NCCAM) is developing its third strategic plan and invites the public to provide comments... through the NCCAM Web site. Background: The National Center for Complementary and Alternative...

  11. 76 FR 21001 - Presquile National Wildlife Refuge, Chesterfield County, VA; Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ...-year plan for achieving refuge purposes and contributing toward the mission of the National Wildlife... Conservation Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... prepare a comprehensive conservation plan (CCP) and environmental assessment (EA) for Presquile...

  12. 78 FR 2655 - Uinta-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...; ] DEPARTMENT OF AGRICULTURE Forest Service Uinta-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project... announces its intent to prepare a supplement to the Ogden Travel Plan Revision Final Supplemental Environmental Impact Statement (FSEIS). The Ogden Travel Plan Revision FSEIS evaluated six alternatives...

  13. Planning National Infrastructures for Documentation, Libraries and Archives; Outline of a General Policy.

    ERIC Educational Resources Information Center

    D'Olier, J. H.; Delmas, B.

    Designed for governmental planners, documentalists, librarians, and archivists, these two United Nations studies examine integration of the planning of libraries and archives services with the planning of economic and social development. In Study 1, the planning of documentation centers and libraries is investigated. An appendix includes survey…

  14. Participative Evaluation for Forming Higher Education Policy: The National Higher Education Planning System.

    ERIC Educational Resources Information Center

    Mercado del Collado, Ricardo

    Higher education planning in Mexico is discussed, with attention to: conceptual characteristics of Mexico's higher education planning system; relationships among the national, regional, state, and institutional planning levels; and design and operation of the Comprehensive Program for the Development of Higher Education. Responsibilities of…

  15. 40 CFR 49.5512 - Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation. 49.5512 Section 49.5512 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans...

  16. 40 CFR 49.5512 - Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation. 49.5512 Section 49.5512 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans...

  17. NCR Parameters: Newsletter of the National Council for Research and Planning, 1999.

    ERIC Educational Resources Information Center

    Spinetta, Katrin, Ed.

    1999-01-01

    This document consists of three issues of NCR Parameters (January, May, and September 1999), a newsletter published by the National Council for Research and Planning to highlight research and planning concerns at two-year postsecondary educational institutions. These three issues focus on: (1) "Multidimensional Planning," (January, 1999)…

  18. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  19. 78 FR 61329 - Revision of the Land Management Plan for the Nantahala and Pisgah National Forests

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    .../nprevision . SUPPLEMENTARY INFORMATION: Pursuant to the 2012 Forest Planning Rule (36 CFR Part 219), the... Forest Service Revision of the Land Management Plan for the Nantahala and Pisgah National Forests AGENCY: Forest Service, USDA. ACTION: Notice of Initiating the development of a land management plan revision...

  20. 40 CFR 49.5513 - Federal Implementation Plan Provisions for Navajo Generating Station, Navajo Nation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Federal Implementation Plan Provisions for Navajo Generating Station, Navajo Nation. 49.5513 Section 49.5513 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans...

  1. 77 FR 66865 - Record of Decision for the Oil and Gas Management Plan, Big South Fork National River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... National Park Service Record of Decision for the Oil and Gas Management Plan, Big South Fork National River... (ROD) for the Oil and Gas Management Plan (Plan) for Big South Fork National River and Recreation Area... impacts from oil and gas development. The plan will guide oil and gas management in Big South...

  2. Los Alamos National Laboratory emergency management plan. Revision 1

    SciTech Connect

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  3. [The National Conference of Propaganda Work on Family Planning held Beijing].

    PubMed

    Ma, B

    1983-01-29

    The National Conference on Propaganda Work in Family Planning, held in Beijing from November 1-6, 1982, was sponsored by the the Propaganda Department of the Chinese Communist Party Central Committee and the National Family Planning Committee. Among the 136 participants were representatives from various provincial, city, and autonomous region propaganda and family planning units, the General Political Department of the People's Liberation Army, general trade unions, All China Women's Federation, Communist Youth League, and propaganda reporters. The purpose of the conference was to discuss how to organize family planning propaganda in meeting China's goal of limiting the population to 1,200,000,000 by 2000, and how to arrange a Family Planning Propaganda Month for early 1983. The Chairman of the National Family Planning Committee made 3 points: family planning is a basic national policy, greater propaganda efforts must be made towards peasant family planning, and everyone must work hard to create a new situation in family planning work. The Vice Minister of the Propaganda Department remarked that family planning propaganda was foremost among the 12 national propaganda topics; these sentiments were supported totally by the representatives of the women and youth groups. The Vice Chairman of the Advisory Committee of the Central Committee said that family planning work was longterm, and that its success lay in the countryside. Finally, the Vice Chairman of the National Family Planning Committee encouraged all delegates to take the spirit of the conference back to their home. During the conference delegates also met to discuss important points in planning the Family Planning Propaganda Month. PMID:12312938

  4. 76 FR 4139 - National Ocean Council; Development of Strategic Action Plans for the National Policy for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-24

    ... TECHNOLOGY POLICY National Ocean Council; Development of Strategic Action Plans for the National Policy for the Stewardship of the Ocean, Our Coasts, and the Great Lakes ACTION: Notice of Intent To Prepare... Stewardship of the Ocean, Our Coasts, and the Great Lakes. Request for comments. SUMMARY: On July 19,...

  5. 77 FR 21161 - National Forest System Land Management Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... until a new planning rule was issued (74 FR 67062). The instability created by these past planning rule... Regulations on December 18, 2009 (74 FR 67062). Outline The following outline shows the contents of the..., 2009 (74 FR 67165). The NOI solicited public comments on the proposal until February 16, 2010....

  6. National Aeronautics and Space Administration plans for space communication technology

    NASA Technical Reports Server (NTRS)

    Alexovich, R. E.

    1979-01-01

    A program plan is presented for a space communications application utilizing the 30/20 GHz frequency bands (30 GHz uplink and 20 GHz downlink). Results of market demand studies and spacecraft systems studies which significantly affect the supporting research and technology program are also presented, along with the scheduled activities of the program plan.

  7. 76 FR 9537 - Sequoia National Forest; California; Piute Mountains Travel Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ...The Sequoia National Forest proposes to develop a travel management plan for the Piute Mountains, located in northeast Kern County, California. The Piute Mountains, with a mixed conifer and pine forest, are included in the eastside Sierra Nevada ecosystem. The project area for this analysis includes 77,679 acres of National Forest System land in the Piute Mountains part of the Sequoia National......

  8. Planning and Establishment of a National Teledocumentation Network--Guidelines Based on the Spanish Experience.

    ERIC Educational Resources Information Center

    Mahon, F. V., Ed.

    Finding that the promotion of a national information industry can best be pursued through the planning and establishment of a national teledocumentation network, this study (based on the experiences of Spain) offers a model that may be of interest to UNESCO (United Nations Educational, Scientific and Cultural Organization) member states wishing to…

  9. 76 FR 23335 - Wilderness Stewardship Plan/Environmental Impact Statement, Sequoia and Kings Canyon National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... may send them by U.S. Postal Service or other mail delivery service, or hand deliver your comments to... National Park Service Wilderness Stewardship Plan/Environmental Impact Statement, Sequoia and Kings Canyon National Parks, Tulare and Fresno Counties, CA AGENCY: National Park Service, Interior. ] ACTION: Notice...

  10. 30 CFR 756.13 - Approval of the Navajo Nation's abandoned mine land plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of the Navajo Nation's abandoned mine....13 Approval of the Navajo Nation's abandoned mine land plan. The Navajo Nation's Abandoned Mine Land... approved effective May 16, 1988. Copies of the approved program are available at: (a) The Navajo...

  11. 30 CFR 756.13 - Approval of the Navajo Nation's abandoned mine land plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of the Navajo Nation's abandoned mine....13 Approval of the Navajo Nation's abandoned mine land plan. The Navajo Nation's Abandoned Mine Land... approved effective May 16, 1988. Copies of the approved program are available at: (a) The Navajo...

  12. 75 FR 39581 - Yosemite Valley Plan; Yosemite National Park; Mariposa, Madera, and Tuolumne Counties, California...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR National Park Service Yosemite Valley Plan; Yosemite National Park; Mariposa, Madera, and Tuolumne Counties, California; Notice of Revised Record of Decision SUMMARY: On December 29, 2000, the National Park...

  13. 77 FR 30319 - Draft Environmental Impact Statement for General Management Plan, Fort Pulaski National Monument, GA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ...Pursuant to the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of a Draft Environmental Impact Statement (DEIS) for the General Management Plan (GMP) and Wilderness Study for Fort Pulaski National Monument (monument). Consistent with NPS laws, regulations, and policies and the purpose of the monument, the......

  14. [National planning of health policy in Brazil: strategies and instruments in the 2000s].

    PubMed

    Machado, Cristiani Vieira; Baptista, Tatiana Wargas de Faria; de Lima, Luciana Dias

    2010-08-01

    This paper discusses the national planning of health policy between 2003 and 2010, in the light of the development of state planning in Brazil and Lula's administration. Firstly an historical overview is presented of the key moments for national planning, regarding its effects on health care. The governmental context is then described with a review of the strategies and instruments in health planning over recent years. The methodology involved a bibliographic and documental review - including the Multi-year Plans, the National Health Plan, the Health Pact and the More Health program - considering their intention, contents and development processes. The results indicate that national health planning has been condensed in order to enable better direction of the policy. Two key moments in federal health planning were identified: between 2003 and 2006 a managerial and participative line was followed; between 2007 and 2010, the managerial line was kept allied to an effort to tie health policy to the development model. Despite the advances, health planning has displayed limitations, such as: restrictions in health financing, which has compromised the execution of the plans; failure to tackle structural problems in the health care system; and the fragile territorial organization. PMID:20802870

  15. Language Planning and Questions of National Security: An Overview of Planning Approaches

    ERIC Educational Resources Information Center

    Liddicoat, Anthony J.

    2008-01-01

    This paper examines ways in which language planning has been used to address issues of security. It gives an overview of a range of areas of security in which government-level language planning has had a role as a way of developing a typology of language planning work in this area. It examines the nexus between language, communication and security…

  16. Penobscot Indian Nation's Strategic Energy Planning Efficiency on tribal Lands

    SciTech Connect

    Sockalexis, Mike; Fields, Brenda

    2006-11-30

    The energy grant provided the resources to evaluate the wind, hydro, biomass, geothermal and solar resource potential on all Penobscot Indian Naiton's Tribal lands. The two objectives address potential renewable energy resources available on tribal lands and energy efficiency measures to be taken after comprehensive energy audits of commercial facilities. Also, a Long Term Strategic Energy Plan was developed along with a plan to reduce high energy costs.

  17. Sandia National Laboratories/Production Agency Weapon Waste Minimization Plan

    SciTech Connect

    Skinrood, A.C.; Radosevich, L.G.

    1991-07-01

    This Plan describes activities to reduce the usage of hazardous materials and the production of hazardous material waste during the development, production, stockpile, and retirement phases of war reserve nuclear weapons and nuclear weapon test units. Activities related to the development and qualification of more benign materials and processes for weapon production and the treatment and disposal of these materials from weapon retirement are described in separate plans.

  18. 76 FR 5820 - Record of Decision for the General Management Plan for the Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... National Park Service Record of Decision for the General Management Plan for the Cumberland Gap National... Cumberland Gap National Historical Park. SUMMARY: Pursuant to the National Environmental Policy Act of 1969... General Management Plan, Cumberland Gap National Historical Park in Kentucky, Tennessee, and Virginia....

  19. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    SciTech Connect

    Chartock, Mike; Hansen, Todd

    1999-08-01

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  20. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    SciTech Connect

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  1. Pacific Northwest National Laboratory institutional plan FY 1997--2002

    SciTech Connect

    1996-10-01

    Pacific Northwest National Laboratory`s core mission is to deliver environmental science and technology in the service of the nation and humanity. Through basic research fundamental knowledge is created of natural, engineered, and social systems that is the basis for both effective environmental technology and sound public policy. Legacy environmental problems are solved by delivering technologies that remedy existing environmental hazards, today`s environmental needs are addressed with technologies that prevent pollution and minimize waste, and the technical foundation is being laid for tomorrow`s inherently clean energy and industrial processes. Pacific Northwest National Laboratory also applies its capabilities to meet selected national security, energy, and human health needs; strengthen the US economy; and support the education of future scientists and engineers. Brief summaries are given of the various tasks being carried out under these broad categories.

  2. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    SciTech Connect

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  3. Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

    SciTech Connect

    Farnham, Irene; Marutzky, Sam

    2014-12-01

    This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

  4. 77 FR 26035 - St. Vincent National Wildlife Refuge, FL; Draft Comprehensive Conservation Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... Fish and Wildlife Service St. Vincent National Wildlife Refuge, FL; Draft Comprehensive Conservation Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability; request for comments. SUMMARY: We, the Fish and Wildlife Service (Service), announce...

  5. 75 FR 36064 - Stellwagen Bank National Marine Sanctuary Final Revised Management Plan: Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ....noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number... FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank National Marine Sanctuary, 175 Edward...

  6. AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule. [San Juan National Forest pilot test

    NASA Technical Reports Server (NTRS)

    Yao, S. S. (Principal Investigator)

    1981-01-01

    The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

  7. Acquisition Planning, Ethnic Discourse, and the Ecuadorian Nation-State.

    ERIC Educational Resources Information Center

    King, Kendall

    1994-01-01

    This paper examines the language planning efforts of the government of Ecuador and groups representing the indigenous peoples of the country. Government sanctioned policy and practice, as well as the grassroots efforts of the Indian population, both aim to influence language behavior and both have ultimately been directed at social and political…

  8. Demystifying Accreditation: Action Plans for a National or Regional Accreditation

    ERIC Educational Resources Information Center

    Wood, Ann L.

    2006-01-01

    As part of educational reform, many institutions of higher education are undergoing accreditation processes. Based on interviews, observations, and the author's experiences in accreditation reviews, this discussion delineates three stages of planning for an accreditation process. Recommendations are organized by each stage of preparation into…

  9. Oak Ridge National Laboratory Institutional Plan, FY 1997--FY 2002

    SciTech Connect

    1996-10-01

    Three major initiatives are described, which are proposed to strengthen ORNL`s ability to support the missions of the Department: neutron science, functional genomics, and distributed computing at teraflop speeds. The laboratory missions, strategic plan, scientific and technical programs, enterprise activities, laboratory operations, and resource projections are also described.

  10. The New Morbidity: A National Plan of Action.

    ERIC Educational Resources Information Center

    Baumeister, Alfred A.; And Others

    1991-01-01

    Discusses child morbidity, suggesting solutions can be found at the community level. Argues the federal government's role is essential in articulating policy and providing resources. Generates a new morbidity model emphasizing poverty and social factors as crucial influences. Lists priorities for effective, preventive, intervention planning. (NL)

  11. National negative-ion-based neutral-beam development plan

    SciTech Connect

    Cooper, W.S.; Pyle, R.V.

    1983-08-01

    The plan covers facilities required, program milestones, and decision points. It includes identification of applications, experiments, theoretical research areas, development of specific technologies and reactor development and demonstration facilities required to bring about the successful application of negative-ion-based neutral beams. Particular emphasis is placed on those activities leading to use on existing plasma confinement experiments or their upgrades.

  12. Issues in Planning and Implementing National Literacy Programmes.

    ERIC Educational Resources Information Center

    Carron, G., Ed.; Bordia, A., Ed.

    The following papers were produced by participants and resource persons on specific issues of planning, management and implementation of literacy and post-literacy strategies: "People's Participation and Mobilization: Characteristics of the Literacy Campaigns in China" (Yanwei); "Strategies for Mobilization and Participation of Volunteers in…

  13. Peru 2021: A Business Plan for National Development.

    ERIC Educational Resources Information Center

    Caravedo, Baltazar

    1998-01-01

    Describes Peru 2021, an organization of business-related individuals with a vision for Peruvian society. Outlines aspects of their vision in the areas of leadership, education, economy, environment, government, business, technology, and society. Discusses Peru 2021's efforts to develop a strategic plan for implementing the vision, to involve…

  14. National Ignition Facility (NIF) FY2015 Facility Use Plan

    SciTech Connect

    Folta, P.; Wisoff, Jeff

    2014-12-18

    Major features of the FY2015 NIF Use Plan include: • Performing a record number of layered DT experiments with 28 planned compared with 15 in FY2014. Executing the first plutonium experiments on the NIF in support of the Science Campaigns. • Over 300 targets shots, a 57% increase compared to FY14. This is a stretch goal defined in the 120-Day Study document, and relies upon the success of many shot-rate improvement actions, as well as on the distribution of shot type selected by the users. While the Plan is consistent with this goal, the increased proportion of layered DT experiments described above reduces the margin against this goal. • Commissioning of initial ARC capability, which will support both SSP-HED and SSPICF programs. • Increase in days allocated to Discovery Science to a level that supports an ongoing program for academic use of NIF and an annual solicitation for new proposals. • Six Facility Maintenance and Reconfiguration (FM&R) periods totaling 30 days dedicated to major facility maintenance and modifications. • Utilization of the NIF Facility Advisory Schedule Committee (FASC) to provide stakeholder review and feedback on the NIF schedule. The Use Plan assumes a total FY2015 LLNL NIF Operations funding in MTE 10.7 of $229.465M and in MTE 10.3 of 47.0M. This Use Plan will be revised in the event of significant changes to the FY2015 funding or if NNSA provides FY2016 budget guidance significantly reduced compared to FY2015.

  15. Transforming American Education: Learning Powered by Technology. National Educational Technology Plan, 2010. Draft

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The National Educational Technology Plan (NETP) presents a model of 21st century learning powered by technology, with goals and recommendations in five essential areas: learning, assessment, teaching, infrastructure, and productivity. The plan also identifies far-reaching "grand challenge problems" that should be funded and coordinated at a…

  16. 76 FR 55643 - Helena National Forest; Montana; Divide Travel Plan EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... Forest Service Helena National Forest; Montana; Divide Travel Plan EIS AGENCY: Forest Service, USDA... the existing motorized public access routes and prohibitions within the Divide travel planning area for wheeled and over-snow motorized vehicles. Consistent with Forest Service travel...

  17. Transforming American Education: Learning Powered by Technology. National Education Technology Plan, 2010

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    This report presents the Administration's National Education Technology Plan. This plan calls for applying the advanced technologies used in everyone's daily personal and professional lives to the entire education system to improve student learning, accelerate and scale up the adoption of effective practices, and use data and information for…

  18. Combating Violence and Delinquency: The National Juvenile Justice Action Plan. Summary.

    ERIC Educational Resources Information Center

    Coordinating Council on Juvenile Justice and Delinquency Prevention, Washington, DC.

    This summary of the Coordinating Council on Juvenile Justice and Delinquency Prevention's "National Juvenile Justice Action Plan" presents innovative and effective strategies designed to reduce violence and victimization. The plan describes how communities can generate solutions and how individuals and groups can prevent or reduce violence in…

  19. Evaluating the Portuguese National Reading Plan: Teachers' Perceptions on the Impact in Schools

    ERIC Educational Resources Information Center

    da Costa, António Firmino; Pegado, Elsa; Ávila, Patrícia; Coelho, Ana Rita

    2015-01-01

    This article focuses on teachers' perceptions of the implementation and impact in Portuguese schools of a wide-ranging and long-term reading promotion programme. The Portuguese National Reading Plan (PNRP) was a public policy initiative whose purpose was to increase literacy levels and reading habits among the population. The Plan identified…

  20. 77 FR 33237 - Saline Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... National Park Service Saline Valley Warm Springs Management Plan/Environmental Impact Statement, Death...: Notice of Intent to Prepare an Environmental Impact Statement for the Saline Valley Warm Springs... environmental impact analysis process for the Saline Valley Warm Springs Management Plan for Death...

  1. Reflections on the Draft National Educational Technology Plan 2010: Foundations for Transformation

    ERIC Educational Resources Information Center

    Dede, Chris

    2010-01-01

    This article provides personal reflections about aspects of the draft "National Educational Technology Plan 2010". Its focus is on ideas in the Plan that could be foundational for transforming our industrial-era schooling system. In sharing these thoughts, the author is speaking only for himself: they do not necessarily reflect the discussions or…

  2. 77 FR 37438 - Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga Valley National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... in meeting the goals of the Plan/EIS. These include the restoration of the existing trail system... common to all action alternatives including restoration of trails, Sustainable Trail Guidelines, and... National Park Service Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga...

  3. The National Educational Technology Plan Doesn't Live up to Its Call for Revolutionary Transformation

    ERIC Educational Resources Information Center

    Rose, Raymond M.

    2011-01-01

    The National Educational Technology Plan (NETP) calls for the revolutionary transformation of the American educational system. The plan correctly points to the decisions of the late 1800s that still direct educational policy today, and correctly calls the school change efforts evolutionary tinkering. The author, a pioneer in online education…

  4. 76 FR 18775 - Pacific Remote Islands Marine National Monument; Monument Management Plan, Comprehensive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Refuges on September 24, 2008 (73 FR 76678; December 17, 2008). For the current MMP/CCP planning process... plans (CCPs) for the following national wildlife refuges (Refuges) contained therein: Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Palmyra Atoll, and Wake Atoll. When the...

  5. 78 FR 40625 - National School Lunch Program: Direct Certification Continuous Improvement Plans Required by the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ... Certification Continuous Improvement Plans Required by the Healthy, Hunger-Free Kids Act of 2010; Approval of... ``National School Lunch Program: Direct Certification Continuous Improvement Plans Required by the Healthy... February 22, 2013 at 78 FR 12221 was approved by OMB on April 10, 2013, under OMB Control Number...

  6. ICT, Education Transformation, and Economic Development: An Analysis of the US National Educational Technology Plan

    ERIC Educational Resources Information Center

    Kozma, Robert B.

    2011-01-01

    In support of the conclusions and recommendations in the National Education Technology Plan (NETP), this article makes explicit the connections between the economic rationale used in the plan and the educational transformations it recommends. The article reviews macroeconomic research, microeconomic research, labor market and workforce studies,…

  7. Design and Planning of National Information Systems (NATIS). A Paper for Government Planners.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    This draft UNESCO document, an extension of a National Information System (NATIS) planning objective, provides guidelines for government planners in determining information policy, and designing and planning NATIS. It is aimed at governments who believe there is a need to develop NATIS for their countries' economic, cultural and social well-being,…

  8. Pandemic influenza preparedness in Latin America: analysis of national strategic plans.

    PubMed

    Mensua, Ana; Mounier-Jack, Sandra; Coker, Richard

    2009-07-01

    The threat of a human pandemic of influenza has prompted the development of national influenza pandemic preparedness plans over the last 4 years. Analyses have been carried out to assess preparedness in Europe, Asia and Africa. We assessed plans to evaluate the national strategic pandemic influenza preparedness in the countries of Latin America. Published national pandemic influenza preparedness plans from Latin American countries were evaluated against criteria drawn from the World Health Organization checklist. Plans were eligible for inclusion if formally published before 16 November 2007. Fifteen national plans were identified and retrieved from the 17 Latin American countries surveyed. Latin American countries demonstrated different degrees of preparedness, and that a high level of completeness of plans was correlated to a country's wealth to a certain extent. Plans were judged strong in addressing surveillance requirements, and provided appropriate communication strategies directed to the general public and health care personnel. However, gaps remained, including the organization of health care services' response; planning and maintenance of essential services; and the provision of containment measures such as the stockpiling of necessary medical supplies including vaccines and antiviral medications. In addition, some inconsistencies and variations which may be important, such as in border control measures and the capacity to contain outbreaks, exist between country plans-issues that could result in confusion in the event of a pandemic. A number of plans remain developmental in nature and, as elsewhere, more emphasis should be placed on strengthening the operability of plans, and in testing them. Whilst taking account of resources constraints, plans should be further developed in a coherent manner with both regional and international imperatives. PMID:19411447

  9. Pacific Northwest National Laboratory institutional plan FY 1998--2002

    SciTech Connect

    1997-12-01

    Pacific Northwest National Laboratory`s core mission is to deliver environmental science and technology in the service of the nation and humanity. Through basic research the lab creates fundamental knowledge of natural, engineered, and social systems that is the basis for both effective environmental technology and sound public policy. They solve legacy environmental problems by delivering technologies that remedy existing environmental hazards, they address today`s environmental needs with technologies that prevent pollution and minimize waste, and they are laying the technical foundation for tomorrow`s inherently clean energy and industrial processes. The lab also applies their capabilities to meet selected national security, energy, and human health needs; strengthen the US economy; and support the education of future scientists and engineers. The paper summarizes individual research activities under each of these areas.

  10. National solar optical materials program plan: an overview

    SciTech Connect

    Masterson, K.D.

    1980-03-01

    A coordinated national program is being formulated to adapt and develop optical materials to support a goal of meeting 20% of our national energy needs with solar by the year 2000. The program contains elements covering absorber, reflector, and transmitter materials but no photovoltaic materials. These elements include research on glass and polymer materials for glazing and reflector components, environmental testing, and long-term reliability modeling. Program subelements that support R and D and encourage commercialization of new products are also discussed. An overview of the proposed funding levels is presented.

  11. Amarillo National Resource Center for Plutonium 1999 plan

    SciTech Connect

    1999-01-30

    The purpose of the Amarillo National Resource Center for Plutonium is to serve the Texas Panhandle, the State of Texas and the US Department of Energy by: conducting scientific and technical research; advising decision makers; and providing information on nuclear weapons materials and related environment, safety, health, and nonproliferation issues while building academic excellence in science and technology. This paper describes the electronic resource library which provides the national archives of technical, policy, historical, and educational information on plutonium. Research projects related to the following topics are described: Environmental restoration and protection; Safety and health; Waste management; Education; Training; Instrumentation development; Materials science; Plutonium processing and handling; and Storage.

  12. Wildland Fire Management Plan for Brookhaven National Laboratory

    SciTech Connect

    Schwager, K.; Green, T. M.

    2014-10-01

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.

  13. National Ignition Facility quality assurance program plan revision 2

    SciTech Connect

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program will be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.

  14. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    SciTech Connect

    Naidu, J.R.; Paquette, D.; Lee, R.

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  15. The Importance of Music: A National Plan for Music Education

    ERIC Educational Resources Information Center

    Department for Education, 2011

    2011-01-01

    England is a world leader in music education. Provision has existed locally for over 50 years. Recent developments have added national funding to the picture so that all pupils have the opportunity to learn a musical instrument. The number accessing regular weekly instrumental tuition has grown from 438,772 (8.4%) in 2005 to a projected figure of…

  16. Staff Studies and Planning Cross-National Research. Final Report.

    ERIC Educational Resources Information Center

    Robinson, Nance M.; And Others

    This paper summarizes findings of an international study which compares the early childhood education and day care systems in 10 industralized nations: France, Great Britain, Hungary, Yugoslavia, Israel, Poland, Denmark, Sweden, USSR, and the United States. Provisions for children from infancy to school entrance are considered. Historical…

  17. Strategic Plan for the ORD National Exposure Research Laboratory (NERL)

    EPA Science Inventory

    The National Exposure Research Laboratory (NERL) has a valued reputation for supporting the Agency’s mission of protecting human health and the environment with multidisciplinary expertise that brings cutting-edge research and technology to address critical exposure questions and...

  18. The NTF as a national facility. [project planning

    NASA Technical Reports Server (NTRS)

    Nicks, O. W.

    1977-01-01

    Activities which led to the definition of the National Transonic Facility and the general agreements reached regarding its use and operations are reviewed. Topics discussed include: redefinition of test requirements, development of low cost options, consideration of a single transonic facility using existing hardware if feasible, facility concept recommendations, and acquisition schedule proposals.

  19. The National Educational Technology Plan: Continuing the Dialogue

    ERIC Educational Resources Information Center

    Rose, Raymond; Waks, Leonard

    2012-01-01

    The members of the working group on National Educational Technology Policy continue to base their formulations around entrenched conceptions of education, retaining the language of teachers, students, curriculum standards, specified objectives and the like. Several of those participating in the panel examining the policy report in an earlier issue…

  20. Troubling National Discourses in Anti-Racist Curricular Planning

    ERIC Educational Resources Information Center

    Schick, Carol; St. Denis, Verna

    2005-01-01

    The narrative of the Canadian prairie context is invested in intercultural relations that privilege whiteness and marginalize Aboriginal people and other racial minorities. We maintain that anti-oppressive curriculum on the Canadian prairies must examine how racial identifications are constructed through commonplace national discourses. A…

  1. Planning Papers for the National Longitudinal Study of Chapter 1.

    ERIC Educational Resources Information Center

    Policy Studies Associates, Inc., Washington, DC.

    The Elementary and Secondary School Improvement Amendments of 1988 (P.L. 100-297) require the U.S. Department of Education to conduct a national longitudinal study of Chapter 1 of the Elementary Secondary Education Act (ESEA). The department commissioned the selection of experts qualified to provide design suggestions and advice for the national…

  2. Biogeochemical processes in an urban, restored wetland of San Francisco Bay, California, 2007-2009; methods and data for plant, sediment and water parameters

    USGS Publications Warehouse

    Windham-Myers, Lisamarie; Marvin-DiPasquale, Mark C.; Agee, Jennifer L.; Kieu, Le H.; Kakouros, Evangelos; Erikson, Li H.; Ward, Kristen

    2010-01-01

    The restoration of 18 acres of historic tidal marsh at Crissy Field has had great success in terms of public outreach and visibility, but less success in terms of revegetated marsh sustainability. Native cordgrass (Spartina foliosa) has experienced dieback and has failed to recolonize following extended flooding events during unintended periodic closures of its inlet channel, which inhibits daily tidal flushing. We examined the biogeochemical impacts of these impoundment events on plant physiology and on sulfur and mercury chemistry to help the National Park Service land managers determine the relative influence of these inlet closures on marsh function. In this comparative study, we examined key pools of sulfur, mercury, and carbon compounds both during and between closure events. Further, we estimated the net hydrodynamic flux of methylmercury and total mercury to and from the marsh during a 24-hour diurnal cycle. This report documents the methods used and the data generated during the study.

  3. Idaho National Laboratory 2013-2022 Ten-Year Site Plan

    SciTech Connect

    Calvin Ozaki; Sheryl L. Morton; Elizabeth A. Connell; William T. Buyers; Craig L. Jacobson; Charles T. Mullen; Christopher P. Ischay; Ernest L. Fossum; Robert D. Logan

    2011-06-01

    The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.

  4. 76 FR 14042 - San Luis Valley National Wildlife Refuge Complex, Alamosa, CO; Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ...We, the U.S. Fish and Wildlife Service (Service), intend to prepare a Comprehensive Conservation Plan (CCP) and an Environmental Impact Statement (EIS) for the San Luis Valley National Wildlife Refuge Complex (Complex) in Alamosa, Colorado. The Complex comprises Baca, Monte Vista, and Alamosa National Wildlife Refuges (NWRs).We provide this notice in compliance with our CCP policy to advise......

  5. 75 FR 57053 - Camas National Wildlife Refuge, Jefferson County, ID; Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... Fish and Wildlife Service Camas National Wildlife Refuge, Jefferson County, ID; Comprehensive... prepare a comprehensive conservation plan (CCP) for Camas National Wildlife Refuge (refuge) in Hamer, ID... Refuge, 2150 East 2350 North, Hamer, ID 83425. In-Person Drop-off: You may drop off comments...

  6. 77 FR 3435 - General Conference Committee of the National Poultry Improvement Plan; Cancellation of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-24

    ... INFORMATION: In a document published in the Federal Register on January 9, 2012 (77 FR 1051-1052, Docket No... Animal and Plant Health Inspection Service General Conference Committee of the National Poultry... Conference Committee of the National Poultry Improvement Plan scheduled for January 25, 2012, has...

  7. Background Research and Mapping. Australian School Science Education National Action Plan, 2008-2012. Volume 2

    ERIC Educational Resources Information Center

    Rennie, Leonie J.; Goodrum, Denis

    2007-01-01

    The purpose of this document is to provide background to the text and recommended actions of the Australian School Science Education National Action Plan, 2007-2012. The first part presents a synthesis of the national and international research used to identify gaps and overlaps amongst activities related to school science education in …

  8. Attitudes of Employees of Provincial Directorates of National Education and School Administrators towards Strategic Planning

    ERIC Educational Resources Information Center

    Altinkurt, Yahya

    2010-01-01

    The aim of the study is to determine the attitudes of employees of Provincial Directorates of National Education and school administrators towards strategic planning. The research was designed as a survey model study. The population of the research consisted of employees of Provincial Directorate of National Education of Kutahya and school…

  9. 30 CFR 756.15 - Required amendments to the Navajo Nation's abandoned mine land plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS § 756.15 Required amendments to the Navajo Nation's abandoned mine land plan. Pursuant to 30 CFR 884.15, the Navajo Nation is required to submit to OSM by the date specified either a proposed... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Required amendments to the Navajo...

  10. 30 CFR 756.15 - Required amendments to the Navajo Nation's abandoned mine land plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS § 756.15 Required amendments to the Navajo Nation's abandoned mine land plan. Pursuant to 30 CFR 884.15, the Navajo Nation is required to submit to OSM by the date specified either a proposed... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Required amendments to the Navajo...

  11. Plan for a National Documentation, Information and Library System for Jamaica.

    ERIC Educational Resources Information Center

    National Council on Libraries, Archives and Documentation Services, Kingston (Jamaica).

    This document presents the proposals of ten working parties, each dealing with a particular type of library or a major topic of current concern, which were set up in 1977 to aid the Jamaica National Council on Libraries, Archives, and Documentation Services in the formulation of a plan for a national documentation, information, and library system.…

  12. 78 FR 24228 - Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final Comprehensive Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... review and comment following the announcement in the Federal Register on October 29, 2012 ] (77 FR 65574... Fish and Wildlife Service Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final... conservation plan and finding of no significant impact (FONSI) for the Lake Andes National Wildlife...

  13. National Ignition Facility quality assurance plan for laser materials and optical technology

    SciTech Connect

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials & Optical Technology (LM&OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM&OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies.

  14. National plan to enhance aviation safety through human factors improvements

    NASA Technical Reports Server (NTRS)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  15. 2014 Report on the Milestones for the US National Plan to Address Alzheimer's Disease.

    PubMed

    Fargo, Keith N; Aisen, Paul; Albert, Marilyn; Au, Rhoda; Corrada, Maria M; DeKosky, Steven; Drachman, David; Fillit, Howard; Gitlin, Laura; Haas, Magali; Herrup, Karl; Kawas, Claudia; Khachaturian, Ara S; Khachaturian, Zaven S; Klunk, William; Knopman, David; Kukull, Walter A; Lamb, Bruce; Logsdon, Rebecca G; Maruff, Paul; Mesulam, Marsel; Mobley, William; Mohs, Richard; Morgan, David; Nixon, Ralph A; Paul, Steven; Petersen, Ronald; Plassman, Brenda; Potter, William; Reiman, Eric; Reisberg, Barry; Sano, Mary; Schindler, Rachel; Schneider, Lon S; Snyder, Peter J; Sperling, Reisa A; Yaffe, Kristine; Bain, Lisa J; Thies, William H; Carrillo, Maria C

    2014-10-01

    With increasing numbers of people with Alzheimer's and other dementias across the globe, many countries have developed national plans to deal with the resulting challenges. In the United States, the National Alzheimer's Project Act, signed into law in 2011, required the creation of such a plan with annual updates thereafter. Pursuant to this, the US Department of Health and Human Services (HHS) released the National Plan to Address Alzheimer's Disease in 2012, including an ambitious research goal of preventing and effectively treating Alzheimer's disease by 2025. To guide investments, activities, and the measurement of progress toward achieving this 2025 goal, in its first annual plan update (2013) HHS also incorporated into the plan a set of short, medium and long-term milestones. HHS further committed to updating these milestones on an ongoing basis to account for progress and setbacks, and emerging opportunities and obstacles. To assist HHS as it updates these milestones, the Alzheimer's Association convened a National Plan Milestone Workgroup consisting of scientific experts representing all areas of Alzheimer's and dementia research. The workgroup evaluated each milestone and made recommendations to ensure that they collectively constitute an adequate work plan for reaching the goal of preventing and effectively treating Alzheimer's by 2025. This report presents these Workgroup recommendations. PMID:25341459

  16. Oak Ridge National Laboratory Institutional Plan, FY 1991--FY 1996

    SciTech Connect

    Not Available

    1991-02-01

    The Oak Ridge National Laboratory -- one of DOE's major multiprogram laboratories -- focuses its resources on energy research and development (R D). To be able to meet these R D challenges, the Laboratory must achieve excellence in its operations relative to environmental, safety, and health (ES H) protection and to restore its aging facility infrastructure. ORNL's missions are carried out in compliance with all applicable ES H regulations. The Laboratory conducts applied R D in energy technologies -- in conservation; fission; magnetic fusion; health and environmental protection; waste management; renewable resources; and fossil energy. Experimental and theoretical research is undertaken to investigate fundamental problems in physical, chemical, materials, computational, biomedical, earth, and environmental sciences; to advance scientific knowledge; and to support energy technology R D. ORNL designs, builds, and operates unique research facilities for the benefit of university, industrial, and national laboratory researchers. The Laboratory serves as a catalyst in bringing national and international research elements together for important scientific and technical collaborations. ORNL helps to prepare the scientific and technical work force of the future by offering innovative and varied learning and R D experiences at the Laboratory for students and faculty from preschool level through postdoctoral candidates. The transfer of science and technology to US industries and universities is an integral component of ORNL's R D missions. ORNL also undertakes research and development for non-DOE sponsors when such work is synergistic with DOE mission. 66 figs., 55 tabs.

  17. 75 FR 41512 - Draft Environmental Impact Statement/General Management Plan; Ross Lake National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ...Pursuant to Sec. 102(2)(C) of the National Environmental Policy Act of 1969 (Pub. L. 91-190, as amended), and the Council on Environmental Quality Regulations (40 CFR part 1500-1508), the National Park Service (NPS), Department of the Interior, has prepared a draft environmental impact statement for the proposed General Management Plan (GMP) for Ross Lake National Recreation Area (Ross Lake......

  18. 78 FR 72060 - Chimney Rock National Monument Management Plan; San Juan National Forest; Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... archaeology, archaeoastronomy, visual and landscape characteristics, and geological and biological features... scientific and historic objects identified, including nationally significant archaeology,...

  19. 78 FR 61251 - The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ...The Federal Transit Administration (FTA) is issuing this consolidated advance notice of proposed rulemaking (ANPRM) to request public comments on a wide range of topics pertaining to the new Public Transportation Safety Program (National Safety Program) and the requirements of the new transit asset management provisions (National TAM System) authorized by the Moving Ahead for Progress in the......

  20. 78 FR 69462 - National Nanotechnology Initiative Strategic Plan; National Science and Technology Council...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... draft plan will be posted at www.nano.gov/2014strategy . Comments of approximately one page or less in... confidential. Please be aware that your comments may be posted online. Web site: www.nano.gov/2014strategy . Email: 2014NNIStrategy@nnco.nano.gov . Postal Mail: Stacey Standridge, ATTN: NNI Strategic Plan...

  1. Capacitively Coupled Resistivity Survey of Selected Irrigation Canals Within the North Platte River Valley, Western Nebraska and Eastern Wyoming, 2004 and 2007-2009

    USGS Publications Warehouse

    Burton, Bethany L.; Johnson, Michaela R.; Vrabel, Joseph; Imig, Brian H.; Payne, Jason D.; Tompkins, Ryan E.

    2009-01-01

    Due to water resources of portions of the North Platte River basin being designated as over-appropriated by the State of Nebraska Department of Natural Resources (DNR), the North Platte Natural Resources District (NPNRD), in cooperation with the DNR, is developing an Integrated Management Plan (IMP) for groundwater and surface water in the NPNRD. As part of the IMP, a three-dimensional numerical finite difference groundwater-flow model is being developed to evaluate the effectiveness of using leakage of water from selected irrigation canal systems to manage groundwater recharge. To determine the relative leakage potential of the upper 8 m of the selected irrigation canals within the North Platte River valley in western Nebraska and eastern Wyoming, the U.S. Geological Survey performed a land-based capacitively coupled (CC) resistivity survey along nearly 630 km of 13 canals and 2 laterals in 2004 and from 2007 to 2009. These 13 canals were selected from the 27 irrigation canals in the North Platte valley due to their location, size, irrigated area, and relation to the active North Platte valley flood plain and related paleochannels and terrace deposits where most of the saturated thickness in the alluvium exists. The resistivity data were then compared to continuous cores at 62 test holes down to a maximum depth of 8 m. Borehole electrical conductivity (EC) measurements at 36 of those test holes were done to correlate resistivity values with grain sizes in order to determine potential vertical leakage along the canals as recharge to the underlying alluvial aquifer. The data acquired in 2004, as well as the 25 test hole cores from 2004, are presented elsewhere. These data were reprocessed using the same updated processing and inversion algorithms used on the 2007 through 2009 datasets, providing a consistent and complete dataset for all collection periods. Thirty-seven test hole cores and borehole electrical conductivity measurements were acquired based on the 2008

  2. French Current Plans for a National Space Legal Framework

    NASA Astrophysics Data System (ADS)

    Clerc, Philippe

    2002-01-01

    France bears the international obligation to authorise and supervise space activities under its jurisdiction and can be liable for damage caused by space objects launched from Kourou (French Guiana) and/or by companies registered in France. The current national framework for the activities carried by Arianespace, Starsem, Eutelsat and for the Ariane European launcher operated from the Guiana Space Centre (CSG) is adequately regulated on the basis of relevant programmatic, contractual and administrative legal regime. But in consequence of the liberalisation of the telecommunications market, of the privatisation of international organisations and State owned companies and of the increasing private demands to access CSG facilities, further regulations could be needed. In this context, the French Ministry of Research's Space Department has convened in 1999, during 2 years, more than 100 technical and legal experts organised in several working groups to propose an upgraded national legal framework for space activities. This constituted working groups dealt with: launching (to implement a licence procedure, considering the responsibility of France and international competition rules), earth observation (for licensing and data policy), telecommunications and navigation, and space objects property and security regime (linked to the registration convention and the Unidroit Space Protocol). Th report of this work named "Space Law Evolution in France Study" was presented to the Minister of Research by the beginnings of this year. The present author has driven the overall study on behalf of the French Research Ministry's Space Department. This paper presents the report's general content with following actions regarding the French national space legal framework.

  3. Oak Ridge National Laboratory institutional plan, FY 1990--FY 1995

    SciTech Connect

    Not Available

    1989-11-01

    The Oak Ridge National Laboratory is one of DOE's major multiprogram energy laboratories. ORNL's program missions are (1) to conduct applied research and engineering development in support of DOE's programs in fusion, fission, fossil, renewables (biomass), and other energy technologies, and in the more efficient conversion and use of energy (conservation) and (2) to perform basic scientific research in selected areas of the physical and life sciences. These missions are to be carried out in compliance with environmental, safety, and health regulations. Transfer of science and technology is an integral component of our missions. A complementary mission is to apply the Laboratory's resources to other nationally important tasks when such work is synergistic with the program missions. Some of the issues addressed include education, international competitiveness, hazardous waste research and development, and selected defense technologies. In addition to the R D missions, ORNL performs important service roles for DOE; these roles include designing, building, and operating user facilities for the benefit of university and industrial researchers and supplying radioactive and stable isotopes that are not available from private industry. Scientific and technical efforts in support of the Laboratory's missions cover a spectrum of activities. In fusion, the emphasis is on advanced studies of toroidal confinement, plasma heating, fueling systems, superconducting magnets, first-wall and blanket materials, and applied plasma physics. 69 figs., 49 tabs.

  4. National Aeronautics and Space Administration 2003 Strategic Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Imagine knowing that we are not alone, but that life is abundant in our solar system and throughout the universe. Imagine a world where we can safely travel anywhere, anytime, on our home planet, and in space. Imagine a world in which long-term weather forecasts are reliable, and natural disasters are predictable and perhaps even preventable. NASA is changing our understanding of the world, exploring the unknown, and creating new awareness about who we are and what our place is in the cosmos. For the first time in history, we have the tools, the insight and ability to seek answers to some of humanity's most profound questions: 1) How did we get here? 2) Where are we going? 3) Are we alone? In addition to pursuing these compelling questions, NASA helps the Nation to meet its challenges and address its urgent national needs. Among these are the requirements to improve the security and safety of our air transportation system and counter the looming shortage of U.S. scientists and engineers in our next generation of Americans.

  5. Waste Reduction plan for Oak Ridge National Laboratory

    SciTech Connect

    Not Available

    1991-12-01

    Oak Ridge National Laboratory (ORNL) is a multipurpose research and development (R D) facility owned and operated by the Department of Energy (DOE) and managed under subcontract by Martin Marietta Energy Systems (Energy Systems), Inc. ORNL R D activities generate numerous small waste streams. In the hazardous waste category alone, over 300 streams of a diverse nature exist. Generation avoidance, reduction or recycling of wastes is an important goal in maintaining efficiency of ORNL R D activities and protection of workers, the public, and the environment. Waste minimization is defined as any action that minimizes or eliminates the volume or toxicity of waste by avoiding its generation or recycling. This is accomplished by material substitution and inventory management, process modification, or recycling wastes for reuse. Waste reduction is defined as waste minimization plus treatment which results in volume or toxicity reduction. The ORNL Waste Reduction Program will include both waste minimization and waste reduction activities.

  6. Waste Reduction plan for Oak Ridge National Laboratory

    SciTech Connect

    Not Available

    1991-12-01

    Oak Ridge National Laboratory (ORNL) is a multipurpose research and development (R&D) facility owned and operated by the Department of Energy (DOE) and managed under subcontract by Martin Marietta Energy Systems (Energy Systems), Inc. ORNL R&D activities generate numerous small waste streams. In the hazardous waste category alone, over 300 streams of a diverse nature exist. Generation avoidance, reduction or recycling of wastes is an important goal in maintaining efficiency of ORNL R&D activities and protection of workers, the public, and the environment. Waste minimization is defined as any action that minimizes or eliminates the volume or toxicity of waste by avoiding its generation or recycling. This is accomplished by material substitution and inventory management, process modification, or recycling wastes for reuse. Waste reduction is defined as waste minimization plus treatment which results in volume or toxicity reduction. The ORNL Waste Reduction Program will include both waste minimization and waste reduction activities.

  7. Waste certification program plan for Oak Ridge National Laboratory

    SciTech Connect

    Kornegay, F.C.

    1996-09-01

    This document defines the waste certification program being developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the waste certification program is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements outlined in U.S. Department of Energy (DOE) Order 5820.2A, Radioactive Waste Management, and ensures that 40 CFR documentation requirements for waste characterization are met for mixed (both radioactive and hazardous) and hazardous (including polychlorinated biphenyls) waste. Program activities will be conducted according to ORNL Level 1 document requirements.

  8. Proceedings of national avian-wind power planning meeting 2

    SciTech Connect

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group`s recommendations for future research or associated activities. A final plenary session drew together the main recommendations.

  9. 75 FR 4340 - Plan Revision for the Coronado National Forest, Cochise, Graham, Pima, Pinal, and Santa Cruz...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ...As directed by the National Forest Management Act, the USDA Forest Service is preparing the Coronado National Forest revised land management plan (Forest Plan) and will also prepare an environmental impact statement (EIS) for this revised Forest Plan. This notice briefly describes the nature of the decision to be made, the proposed action and need for change, and information concerning public......

  10. 78 FR 54469 - Solicitation of Written Comments on Draft National Action Plan for Adverse Drug Event Prevention

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... HUMAN SERVICES Solicitation of Written Comments on Draft National Action Plan for Adverse Drug Event... Action Plan for Adverse Drug Event Prevention. DATES: Comments on the draft National Action Plan for Adverse Drug Event Prevention must be received no later than 5 p.m. on October 4, 2013. This...

  11. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    SciTech Connect

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  12. Oil-spill contingency planning: National status. A report to the President. Final report

    SciTech Connect

    Not Available

    1990-10-01

    The report examines the Nation's oil spill preparedness and response system in the wake of the Exxon Valdez disaster. It describes the nationwide oil spill response system, including the Federal Government's National Response System; the status of Federal, state, local and industry contingency planning; the adequacy of exercises testing oil spill plans; the effectiveness of oil spill contingency plans; and the development, response, and shortfall assessment of worst-case scenarios. The document also addresses key environmental and health concerns, including the potential for contamination of the food chain, the emotional and social stress that accompany significant spills, and strategies for mitigating these hazards. An extensive set of appendices summarizes regional response team contingency plans. The report emphasizes that prevention activities remain the best protection against oil spills, regardless of the effectiveness of response capabilities.

  13. Midterm review of national health plans: an example from the United Republic of Tanzania

    PubMed Central

    Ipuge, Yahya; Kumalija, Claud J; Rubona, Josbert; Perera, Sriyant; Masanja, Honorati; Boerma, Ties

    2015-01-01

    Abstract In the health sector, planning and resource allocation at country level are mainly guided by national plans. For each such plan, a midterm review of progress is important for policy-makers since the review can inform the second half of the plan’s implementation and provide a situation analysis on which the subsequent plan can be based. The review should include a comprehensive analysis using recent data – from surveys, facility and administrative databases – and global health estimates. Any midterm analysis of progress is best conducted by a team comprising representatives of government agencies, independent national institutions and global health organizations. Here we present an example of such a review, done in 2013 in the United Republic of Tanzania. Compared to similar countries, the results of this midterm review showed good progress in all health indicators except skilled birth attendance. PMID:26229191

  14. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    SciTech Connect

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  15. 78 FR 41782 - Nez Perce-Clearwater National Forests; Idaho; Notice To Proceed With Forest Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Forest Service Nez Perce-Clearwater National Forests; Idaho; Notice To Proceed With Forest Plan Revision AGENCY: Forest Service, Northern Region, Nez Perce-Clearwater National Forests, USDA. ACTION: Notice of initiating the development of a proposed forest plan revision for the Nez Perce-Clearwater National...

  16. 78 FR 43226 - Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... National Park Service Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement... Environmental Impact Statement for the Going-to-the-Sun Road Corridor Management Plan for Glacier National Park...-to-the Sun Road (GTSR) corridor. DATES: The National Park Service will accept comments from...

  17. Planning National Parks for Ecodevelopment. Methods and Cases from Latin America. Volumes I and II. Reprint R073.

    ERIC Educational Resources Information Center

    Miller, Kenton R.

    This book deals with methods for planning national parks to enable them to provide the greatest benefit to human activity. Chapters included are: (1) "A Conceptual Framework for the Management of Wildland Resources"; (2) "The Growth and Development of National Parks in Latin America"; (3) "Planning National Parks for Ecodevelopment in Latin…

  18. Detailed leak detection test plan and schedule for the Oak Ridge National Laboratory LLLW active tanks

    SciTech Connect

    Douglas, D.G.; Maresca, J.W. Jr. )

    1993-03-01

    This document provides a detailed leak detection test plan and schedule for leak testing many of the tanks that comprise the active portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement (FFA) between the US Department of Energy (DOE) and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC).

  19. National Needs of Family Planning Among US Men Aged 15 to 44 Years

    PubMed Central

    Gibbs, Susannah E.; Choiriyyah, Ifta; Sonenstein, Freya L.; Astone, Nan M.; Pleck, Joseph H.; Dariotis, Jacinda K.

    2016-01-01

    Objectives. To estimate national need for family planning services among men in the United States according to background characteristics, access to care, receipt of services, and contraception use. Methods. We used weighted data from the 2006–2010 National Survey of Family Growth to estimate the percentage of men aged 15 to 44 years (n = 10 395) in need of family planning, based on sexual behavior, fecundity, and not trying to get pregnant with his partner. Results. Overall, 60% of men were in need of family planning, defined as those who ever had vaginal sex, were fecund, and had fecund partner(s) who were not trying to get pregnant with partner or partner(s) were not currently pregnant. The greatest need was among young and unmarried men. Most men in need of family planning had access to care, but few reported receiving family planning services (< 19%), consistently using condoms (26%), or having partners consistently using contraception (41%). Conclusions. The need for engaging men aged 15 to 44 years in family planning education and care is substantial and largely unmet despite national public health priorities to include men in reducing unintended pregnancies. PMID:26890180

  20. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  1. 77 FR 64748 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Listed on the National Priorities List (60 FR 55466) on November 1, 1995. As described in 300.425(e)(3... proposed for inclusion on the National Priorities List (NPL) in October of 1984, Federal Register (49 FR...: Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351;...

  2. Measurement and evaluation of national family planning programs.

    PubMed

    Mauldin, W P

    1967-03-01

    ) segura de traducir las estadísticas de servicio en práticas y tal vez aún datos sobre suministro comercial en datos sabre tasas de natalidad. Esto incluye, par ejemplo, los esfuerzos para consolidar observaciones coma "cinco años-mujer de usa de IUD, a 400 condones equivalen a la prevención de un nacimiento," y esfuerzos como los de Pakistán de calcular tasas coma "años de protección de una pareja contra el embarazo."In the belief that a decrease in the rate of population growth will increase economic development, more than ten countries have inaugurated family planning programs in the past fifteen years. To provide a model for measuring the immediate, intermediate, and long-term effects of any such program, the authors use the Taiwan evaluation.The model suggests that a good system of evaluation should include monthly statistics on (1) participants, who are grouped by characteristics; (2) the distribution of supplies, reported at first by the characteristics of recipients, but after by gross volume only; (3) family planning activities of private physicians to measure the catalytic effect on the private sector; (4) new contacts and amount of advertising in mass media; (5) costs broken down by areas and by cost categories; and (6) distribution of commercial supplies. In addition, the program should conduct 300-400 interviews every 6-12 months to learn the rates of continuation and the rates and reasons for discontinuation. Finally, a KAP survey should be conducted every two years.The administration of the evaluation should be close to the director for policy decisions and for the ultimate work of evaluation-the finding of new ways to measure the main goal of change in fertility by the translation of statistics on Services provided and commercial supplies into birth rate data. PMID:21279762

  3. Federal Facility Compliance Act: Conceptual Site Treatment Plan for Lawrence Livermore National Laboratory, Livermore, California

    SciTech Connect

    Not Available

    1993-10-01

    The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document.

  4. Discourses of disease, discourses of disadvantage: a critical analysis of National Pandemic Influenza Preparedness Plans.

    PubMed

    Garoon, Joshua P; Duggan, Patrick S

    2008-10-01

    Growing recognition of the threat of pandemic influenza to global health has led to increased emphasis on pandemic influenza preparedness planning. Previous analysis of national pandemic preparedness plans has revealed that those plans paid scant attention to the needs and interests of the disadvantaged. This paper investigates those findings via critical discourse analysis of the same plans as well as World Health Organization guidance documents. The analysis reveals that the texts operate within and as parts of an ordered universe of discourse. Among the six discourses which emerge from the analysis the scientific, political, and legal dominate the social, cultural, and ethical. This order of discourse delineates a specific regime of truths within which the lives, needs, and interests of the disadvantaged are masked or neglected. Unless the plans recognize their discursive construction, implementation of the policies and practices they prescribe runs the risk of further disadvantaging those very populations most likely to require protection. PMID:18656294

  5. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1994-08-01

    This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  6. National climate change action plans: Interim report for developing and transition countries

    SciTech Connect

    Benioff, R.; Ness, E.; Hirst, J.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  7. The U.S. EPA's Climate Change Adaptation Plans and the Nation Climate Assessment

    NASA Astrophysics Data System (ADS)

    Marr, S.; Kemmerer, J.

    2014-12-01

    When the Council on Environmental Quality directed the U.S. EPA and other Federal departments and agencies to identify how they will maintain their missions in the face of a changing climate, the need for sound science as an essential foundation for climate preparedness was apparent. Fortunately, since 2000, the U.S. Global Change Research Program has produced the National Climate Assessment three times, with the most recent version being issued in May, 2014. The EPA turned to the National Climate Assessment for a key source of sound science as it drafted its national and regional climate adaptation plans. The assessment continues to be used as EPA staff are trained on climate change adaptation issues. Examples of recent EPA climate change adaptation national and regional products will be presented that highlight the utility of the National Climate Assessment. The importance to EPA of the National Climate Assessment as a common ground for all Federal agencies will also be discussed.

  8. Reengineering the national clinical and translational research enterprise: the strategic plan of the National Clinical and Translational Science Awards Consortium.

    PubMed

    Reis, Steven E; Berglund, Lars; Bernard, Gordon R; Califf, Robert M; Fitzgerald, Garret A; Johnson, Peter C

    2010-03-01

    Advances in human health require the efficient and rapid translation of scientific discoveries into effective clinical treatments; this process, in turn, depends on observational data gathered from patients, communities, and public health research that can be used to guide basic scientific investigation. Such bidirectional translational science, however, faces unprecedented challenges due to the rapid pace of scientific and technological development, as well as the difficulties of negotiating increasingly complex regulatory and commercial environments that overlap the research domain. Further, numerous barriers to translational science have emerged among the nation's academic research centers, including basic structural and cultural impediments to innovation and collaboration, shortages of trained investigators, and inadequate funding.To address these serious and systemic problems, in 2006 the National Institutes of Health created the Clinical and Translational Science Awards (CTSA) program, which aims to catalyze the transformation of biomedical research at a national level, speeding the discovery and development of therapies, fostering collaboration, engaging communities, and training succeeding generations of clinical and translational researchers. The authors report in detail on the planning process, begun in 2008, that was used to engage stakeholders and to identify, refine, and ultimately implement the CTSA program's overarching strategic goals. They also discuss the implications and likely impact of this strategic planning process as it is applied among the nation's academic health centers. PMID:20182119

  9. Strategic environmental assessment and national development plans in Turkey: Towards legal framework and operational procedure

    SciTech Connect

    Say, Nuriye Peker . E-mail: nursay@cu.edu.tr; Yuecel, Muzaffer

    2006-04-15

    National development plans were started to be prepared in Turkey in 1963. These plans are mandatory for public investments and guiding principles for private investments. They have a quality which guides and sets objectives for other plans in the country. Therefore, they can be evaluated as the main reason of successes and failures of sectoral investments or the problems that they cause directly or indirectly. Turkey is undergoing rapid industrialization, urbanization and population growth, thus environmental problems are on the increase. Although Environmental Impact Assessment (EIA) has been applied to individual investments in Turkey since 1993, natural environment has continued to be affected because of human activities. Today, parallel to the developments in the world, it has been discussed that it is necessary to strengthen project-level Environmental Assessment (EA) and to practice Strategic Environmental Assessment (SEA). The interest in SEA, that is, EA at the level of proposed policies, plans and programs has grown significantly since 2000 in the country. Discussions and preparations have started about regulation which provides the legal and institutional framework for SEA in The Ministry of Environment and Forestry. However, since the scientific approach into the subject is very new in Turkey, it will take time to answer the questions about how and in what fields to practice. This research project aims at analyzing the possible practice opportunities of SEA in Turkey and the practicability of SEA into the National Five-Year Development Plan (FYDP) which is assumed at the highest level of planning hierarchy in the country. The research is conducted on two sections. In the first section, procedural approaches to SEA on national development plans are investigated and a framework for these approaches is adapted at the institutional level. In the second section, SEA form for energy sector in the development plans is developed. In this article, the findings

  10. 76 FR 59156 - Notice of Availability of the Proposed Ironwood Forest National Monument Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... Bureau of Land Management Notice of Availability of the Proposed Ironwood Forest National Monument... Proposed Resource Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the Ironwood Forest... Agency publishes this notice in the Federal Register. ADDRESSES: Copies of the Ironwood Forest...

  11. 75 FR 30423 - Draft Comprehensive Conservation Plan and Environmental Assessment; Canaan Valley National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Fish and Wildlife Service Draft Comprehensive Conservation Plan and Environmental Assessment; Canaan Valley National Wildlife Refuge, Tucker County, WV AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability; request for comments. SUMMARY: We, the U.S. Fish and Wildlife Service...

  12. 78 FR 51205 - Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... invasive species control and eradication and pursue habitat restoration on offshore cays. Within 5 years of... Fish and Wildlife Service Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No Significant Impact for the Environmental Assessment AGENCY: Fish and...

  13. 76 FR 36143 - Bombay Hook National Wildlife Refuge, Kent County, DE; Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ...We, the U.S. Fish and Wildlife Service (Service), intend to prepare a comprehensive conservation plan (CCP) and associated environmental assessment (EA) for Bombay Hook National Wildlife Refuge (BHNWR). We provide this notice in compliance with our policy to advise other Federal and State agencies, Tribes, and the public of our intentions, and to obtain suggestions and information on the scope......

  14. 75 FR 72784 - Helena National Forest; Montana; Blackfoot Travel Plan EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... notice was published in the Federal Register on October 29, 2010, FR Doc. 2010- 27353 (75 FR 66718-66719... Forest Service Helena National Forest; Montana; Blackfoot Travel Plan EIS AGENCY: Forest Service, USDA. ACTION: Corrected Notice of Intent to prepare an Environmental Impact Statement for the Blackfoot...

  15. 75 FR 6870 - Washita and Optima National Wildlife Refuges, Comprehensive Conservation Plan, Custer and Texas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-12

    ...We, the U.S. Fish and Wildlife Service (Service), announce the availability of our final comprehensive conservation plan (CCP) and finding of no significant impact (FONSI) and environmental assessment (EA) for the Washita and Optima National Wildlife Refuges (NWRs, Refuges) near Butler, Oklahoma. In this final CCP, we describe how we will guide the development and management of the Washita and......

  16. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 4 2014-04-01 2014-04-01 false Filing and amendment of national market system plans. 242.608 Section 242.608 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) REGULATIONS M, SHO, ATS, AC, AND NMS AND CUSTOMER MARGIN REQUIREMENTS FOR SECURITY FUTURES Regulation Nms-Regulation...

  17. 76 FR 61378 - Dungeness National Wildlife Refuge, Clallam County, WA; Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ...We, the U.S. Fish and Wildlife Service (Service), intend to prepare a comprehensive conservation plan (CCP) and environmental assessment (EA) for Dungeness National Wildlife Refuge (Refuge or NWR) in Clallam County, Washington. We provide this notice in compliance with our CCP policy to advise other Federal and State agencies, Tribes, and the public of our intentions and to obtain suggestions......

  18. 77 FR 66729 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ...EPA is taking direct final action to amend the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), to acknowledge advancements in technologies used to manage and convey information to the public. Specifically, this revision will add language to EPA regulations to broaden the technology, to include computer telecommunications or other electronic means, that the lead agency......

  19. Comparative Review of a Dozen National Energy Plans: Focus on Renewable and Efficient Energy

    SciTech Connect

    Logan, J.; James, T. L.

    2009-03-01

    Dozens of groups have submitted energy, environmental, and economic recovery plans for consideration by the Obama administration and the 111th Congress. This report provides a comparative analysis of 12 national proposals, focusing especially on energy efficiency (EE) and renewable energy (RE) market and policy issues.

  20. A Comparative Review of a Dozen National Energy Plans. Focus on Renewable and Efficient Energy

    SciTech Connect

    Logan, Jeffrey; James, Ted L.

    2009-03-01

    Dozens of groups have submitted energy, environmental, and economic recovery plans for consideration by the Obama administration and the 111th Congress. This report provides a comparative analysis of 12 national proposals, focusing especially on energy efficiency (EE) and renewable energy (RE) market and policy issues.

  1. TECHNICAL SUPPORT FOR THE NATIONAL CHILDREN'S STUDY (NCS): DEVELOPMENT OF A QUALITY MANAGEMENT PLAN

    EPA Science Inventory

    The Children's Health Act of 2000 (PL 106-310) mandated the National Institute of Child Health and Human Development, (NICHD), the Environmental Protection Agency (EPA), and the Centers for Disease Control and Prevention (CDC), to jointly plan, develop, and conduct a prospective ...

  2. 75 FR 81561 - Huron-Manistee National Forests, Michigan, Land and Resource Management Plan Supplemental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Management Plan alternative that would ban firearm hunting and snowmobile use (subject to existing rights) on National Forest System lands within Semiprimitive Nonmotorized Management Areas and would ban firearm... Service would ban firearm hunting and snowmobile use in some portion of the 13 existing...

  3. 77 FR 19309 - Benton Lake National Wildlife Refuge Complex, Great Falls, MT; Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ...We, the U.S. Fish and Wildlife Service (Service), announce the availability of a draft comprehensive conservation plan and environmental assessment (Draft CCP/EA) for Benton Lake National Wildlife Refuge Complex for public review and comment. The Draft CCP/EA describes our proposal for managing the refuge complex for the next 15...

  4. 76 FR 16795 - The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... HUMAN SERVICES Food and Drug Administration The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for Comments; Extension of Comment Period AGENCY: Food and Drug Administration, HHS. ACTION: Notice; request for comments; extension of comment period. SUMMARY: The Food...

  5. 78 FR 8273 - Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... February 5, 2013 Part III Environmental Protection Agency 40 CFR Part 49 Approval of Air Quality...; ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for Navajo Generating Station AGENCY: Environmental Protection Agency...

  6. 76 FR 11193 - Sequoia National Forest; California; Piute Mountains Travel Management Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... for the Piute Mountains Travel Management Plan. FOR FURTHER INFORMATION CONTACT: Warren L. Niemi, 559-784-1500, extension 1137. Correction In the Federal Register of February 18, 2011, in FR Doc. 2011...; ] DEPARTMENT OF AGRICULTURE Forest Service Sequoia National Forest; California; Piute Mountains...

  7. 76 FR 16634 - Seal Beach National Wildlife Refuge, Orange County, CA; Draft Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... Federal Register notice of intent published on April 16, 2007 (72 FR 190160), two scoping meetings, two... Fish and Wildlife Service Seal Beach National Wildlife Refuge, Orange County, CA; Draft Comprehensive... availability of a draft comprehensive conservation plan (CCP) and environmental assessment (EA) for the...

  8. 78 FR 67418 - National Plan for Civil Earth Observations; Request for Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... TECHNOLOGY POLICY National Plan for Civil Earth Observations; Request for Information ACTION: Notice of... inform the Office of Science and Technology Policy (OSTP) as it works with Federal agencies and other... Observations'' in the subject line of the message. Fax: (202) 456-6071. Mail: Office of Science and...

  9. 75 FR 65370 - National Elk Refuge, Jackson, WY; Comprehensive Conservation Plan and Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... Fish and Wildlife Service National Elk Refuge, Jackson, WY; Comprehensive Conservation Plan and... comments. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), intend to prepare a comprehensive... that will ensure the best possible approach to wildlife, plant, and habitat conservation,...

  10. 77 FR 132 - General Management Plan and Environmental Impact Statement for Lincoln Home National Historic Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... General Management Plan and Environmental Impact Statement (GMP/EIS) will remain available for public... Site. SUPPLEMENTARY INFORMATION: We, the National Park Service, prepared a draft GMP/EIS for the park... summaries of the draft GMP/EIS. In addition to the distribution, the draft GMP/EIS was also made...

  11. A Report of the Task Force on the National Strategic Research Plan.

    ERIC Educational Resources Information Center

    National Inst. on Deafness and Other Communications Disorders, Bethesda, MD.

    This strategic research plan presents the state of knowledge and research needs and opportunities in the area of communication disorders. It is designed to guide the decision-making processes of the National Institute on Deafness and Other Communication Disorders (NIDCD), to inform scientific investigators of possible areas of opportunity for…

  12. 76 FR 60522 - Selawik National Wildlife Refuge, Kotzebue, AK; Revised Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ...We, the Fish and Wildlife Service (Service, USFWS), announce the availability of our revised comprehensive conservation plan (CCP) and finding of no significant impact (FONSI) for the Selawik National Wildlife Refuge (Refuge). In this revised CCP, we describe how we will manage the Refuge for the next 15...

  13. National technology needs assessment for the preparation and implementation of climate change action plans

    SciTech Connect

    Berkel, C.W.M. van; Blonk, T.J.; Westra, C.A.

    1996-12-31

    In the United National Framework Convention on Climate Change (FCCC) it is recognised that developed countries have a responsibility in assisting developing countries and countries in economic transition in building a national capacity for the development, acquisition and transfer of Climate-related Technologies (CTs). Such assistance is most likely to be successful once it is tailored to the results of a sound assessment of the country`s development needs and once the results of this assessment have been endorsed by the most important stakeholders in the country. Recent insight in the opportunities and constraints for National (technology) Needs Assessments (NNAs) as planning tool for both capacity building and technology transfer regarding Environmentally Sound Technologies (ESTs) is applied here to propose a participatory Climate Change Action Planning (CCAP) process. This participatory planning process is thought to serve the dual objective of defining a national Climate Change Action Plan (CCAP) while at the same time contributing to the creation of a broad supportive basis for its acceptance and implementation among stakeholders in the developing country.

  14. Planning a text-management system for technical publications at Oak Ridge National Laboratory

    SciTech Connect

    Williams, E.N.; McCulloch, R.D.

    1980-01-01

    The planning and evolution of the centralized text-management system (CTMS) being implemented by the Technical Publications Department of the Oak Ridge National Laboratory's Information Division is described. The CTMS is a shared-logic system that provides for easy composition of technical documentation, including multilevel mathematics and complex tables. 3 figures.

  15. A Practical Model of Development for China's National Quality Course Plan

    ERIC Educational Resources Information Center

    Long, Wang; Haklev, Stian

    2012-01-01

    The Chinese National Quality Course Plan is a large-scale project by the Ministry of Education, which has led to the production of more than 12,000 courses from some 700 universities since 2003. This paper describes in detail the purpose of the project and how it is organized at all levels, including how individual courses get selected at…

  16. 77 FR 40895 - Culebra National Wildlife Refuge, PR; Draft Comprehensive Conservation Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... on December 19, 2008 (73 FR 77827). For more about the refuge, please see that notice. Background The... Fish and Wildlife Service Culebra National Wildlife Refuge, PR; Draft Comprehensive Conservation Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice...

  17. 76 FR 50247 - Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Fish and Wildlife Service Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce...

  18. 77 FR 31870 - Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Fish and Wildlife Service Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service) announce that our Final Comprehensive Conservation...

  19. Career Planning Profile National Norms for Vocational-Technical Students beyond High School.

    ERIC Educational Resources Information Center

    American Coll. Testing Program, Iowa City, IA. Research and Development Div.

    The Career Planning Profile (CPP) national norms presented in this document provide comprehensive information on the abilities, interests, and other personal characteristics of a cross section of vocational and technical students enrolled in a wide range of programs. It was developed to help young people consider a broad range of occupations and…

  20. 76 FR 22115 - National Emergency Communications Plan (NECP) Goal 2 Performance Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... Federal Register on January 14, 2011, at 75 FR 2700, for a 60-day public comment period. DHS received no... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOMELAND SECURITY National Emergency Communications Plan (NECP) Goal 2 Performance Report AGENCY:...

  1. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 3 2011-04-01 2011-04-01 false Filing and amendment of national market system plans. 242.608 Section 242.608 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) REGULATIONS M, SHO, ATS, AC, AND NMS AND CUSTOMER MARGIN REQUIREMENTS...

  2. National Strategic Research Plan for Hearing and Hearing Impairment and Voice and Voice Disorders.

    ERIC Educational Resources Information Center

    National Inst. on Deafness and Other Communications Disorders, Bethesda, MD.

    This monograph presents an update to the strategic plan of the National Institute on Deafness and Other Communication Disorders (NIDCD), focusing on recent accomplishments, program goals, strategies, and priorities in research opportunities in the areas of hearing/hearing impairment and voice/voice disorders. Specifically considered for the…

  3. The Multi-Agent Model of Language Choice: National Planning and Individual Volition in China

    ERIC Educational Resources Information Center

    Lam, Agnes S. L.

    2007-01-01

    Language choice is often studied as choices made by the state at the level of national language planning or as individual choice of language or variety in language use. There has been little research to directly connect these two aspects of language choice. This paper attempts to incorporate the two aspects and other related phenomena in a…

  4. Response to the Articles on the Draft 2010 National Educational Technology Plan

    ERIC Educational Resources Information Center

    Atkins, Dan; Bennett, John; Brown, John Seely; Dede, Chris; Fishman, Barry; Means, Barbara, Pea, Roy; Thille, Candace; Williams, Brenda

    2011-01-01

    As people who were involved with drafting the 2010 National Educational Technology Plan (NETP), the authors have taken the opportunity to respond to the very interesting perspectives in this special issue. The thoughts here represent only their views and are not an official statement of either the US Department of Education or the NETP Technical…

  5. Emergency Medical Technician-Ambulance: National Standard Curriculum. Instructor's Lesson Plans (Third Edition).

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This set of instructor's lesson plans is one of three documents prepared for the Emergency Medical Technician (EMT) National Standard Curriculum. It contains detailed outlines of course content and guidance for teaching each course lesson. The training course contains 33 lessons covering all emergency medical techniques currently considered to be…

  6. 78 FR 24134 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ...The Environmental Protection Agency (EPA) Region 4 is issuing a Notice of Intent to Delete the Koppers Co., Inc. (Florence Plant) Superfund Site (Site) located in Florence, South Carolina, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and......

  7. 75 FR 54779 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... of Policy Change: Partial Deletion of Sites Listed on the National Priorities List, 60 FR 55466 (Nov... institutional controls (ICs) are functioning properly. The Site was added to the Superfund NPL in 1983 (48 FR... about 1914 to the mid-1920s generated large quantities of radioactive residues in the Denver...

  8. 78 FR 33276 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-04

    ... Change: Partial Deletion of Sites Listed on the National Priorities List. 60 FR 55466 (Nov. 1, 1995). As... February 26, 2002 (67 FR 8836). The Site was listed on the NPL on April 30, 2003 (68 FR 23094). The.... 12777, 56 FR 54757,3 CFR, 1991 Comp., p.351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp., p.193....

  9. 75 FR 63140 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... the National Priorities List (NPL) on September 9, 2010 (75 FR 54779). The portions proposed for... Federal Register notice for the proposed deletion (75 FR 54779) discusses this rationale in detail. DATES... Denver, Colorado. Groundwater contamination associated with Operable Unit 8 will remain on the NPL....

  10. 78 FR 69302 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... significant risk to public health, welfare, or the environment. Sites on the NPL may be the subject of... Notice of Policy Change: Partial Deletion of Sites Listed on the National Priorities List. 60 FR 55466... investigation has shown that the release poses no significant threat to public health or the environment...

  11. 75 FR 34405 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... the NPL as part of the Internal Parcel Partial Deletion in 2006 (71 FR 43071). DATES: Comments must be... National Priorities List (60 FR 55466 (Nov. 1, 1995)). As described in 40 CFR 300.425(e)(3), a portion of a... proposed to the NPL, excluding the Basin F surface impoundment, on October 15, 1984, (49 FR 40320). On...

  12. 75 FR 27192 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ...The Environmental Protection Agency (EPA) Region 6 is publishing a direct final Notice of Deletion of the Ruston Foundry Superfund Site (Site), located in Alexandria, Rapides Parish, Louisiana, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an......

  13. 77 FR 14717 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... Listed on the National Priorities List, 60 FR 55466 (Nov. 1, 1995). As described in 300.425(e)(3) of the... October 26, 1989 (54 FR 43779), placed on the NPL August 30, 1990 (55 FR 35509), and is therefore subject... operable unit were deleted from the NPL December 4, 2006 (71 FR 70318). Four areas not deleted in 2006...

  14. 75 FR 44920 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ...The Environmental Protection Agency (EPA), Region 2, announces the deletion of the SMS Instruments, Inc. Superfund Site (Site), located in Deer Park, Suffolk County, New York, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the......

  15. 78 FR 44512 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ...The Environmental Protection Agency (EPA) Region 9 is issuing a Notice of Intent to Delete the Sola Optical U.S.A., Inc. Superfund Site (Site) located in Petaluma, California, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act......

  16. 77 FR 21919 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ...The Environmental Protection Agency (EPA) Region 5 is issuing a Notice of Intent to Delete the A & F Material Reclaiming, Inc. Superfund Site (Site) located in Greenup, Illinois from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act......

  17. 75 FR 44932 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ...The Environmental Protection Agency (EPA), Region 2, is issuing a Notice of Intent to Delete the SMS Instruments, Inc. Superfund Site (Site), located in Deer Park, New York, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act......

  18. 75 FR 26131 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ...The Environmental Protection Agency (EPA) Region II is publishing a direct final Notice of Deletion of the Asbestos Dump Superfund Site (Site), located in Long Hill Township and Harding Township, New Jersey, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as......

  19. 75 FR 26166 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ...The Environmental Protection Agency (EPA) Region 2 is issuing a Notice of Intent to Delete the Asbestos Dump Superfund Site (Site) located in Meyersville, New Jersey, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of......

  20. 76 FR 71500 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... National Priorities List (NPL) on September 30, 2011, (76 FR 60777). The NPL, promulgated pursuant to... proposed deletion (76 FR 60777) discusses this rationale in detail. DATES: Comments concerning the proposed... requirements, Superfund, Water pollution control, Water Supply. Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C....

  1. 76 FR 30027 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... FR 55466 (Nov. 1, 1995). As described in 300.425(e)(3) of the NCP, a portion of a site deleted from... proposed for inclusion on the National Priorities List, December 30, 1982, 47 FR 58476, and listed on September 8, 1983, 48 FR 40,658. The Site is in a highly mineralized area of the Colorado Rocky...

  2. 75 FR 48895 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List: Intent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ...The Environmental Protection Agency (EPA) Region 6 is issuing a Notice of Intent to Delete the Rogers Road Municipal Landfill Superfund Site located near Jacksonville, Pulaski County, Arkansas from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and......

  3. 78 FR 49939 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ...The U.S. Environmental Protection Agency Region 5 is publishing a direct final Notice of Deletion of the Quincy Smelter and Calumet Lake parcels of Operable Unit 3 (OU3) of the Torch Lake Superfund Site (Site), located in Houghton County, Michigan, from the National Priorities List (NPL). The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation,......

  4. 76 FR 18066 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ...The Environmental Protection Agency (EPA) Region 1 is publishing a direct final Notice of Deletion of the Norwood PCBs Superfund Site (Site), located in Norwood Massachusetts from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the......

  5. Learning from conservation planning for the U.S. National Wildlife Refuges.

    PubMed

    Meretsky, Vicky J; Fischman, Robert L

    2014-10-01

    The U.S. National Wildlife Refuge System has nearly completed its first round of unit-level, comprehensive conservation plans (CCPs) and will soon begin required revisions. Laws and policies governing refuge planning emphasize ecological integrity, landscape-scale conservation, and adaptive management. We evaluated 185 CCPs completed during 2005-2011, which cover 324 of 555 national wildlife refuges. We reviewed CCP prescriptions addressing 5 common conservation issues (habitat and game, nongame, imperiled, and invasive species) and 3 specialized topics (landscape-scale conservation, climate change, and environmental quality). Common conservation issues received prescriptions in >90% of CCPs. Specialized topics received more variable treatment. Prescriptions for aquatic connectivity, water quantity, and climate-change impacts increased over the study period. Except for climate change, direct actions were the most common type of management prescription, followed by plans or studies. Most CCPs stated a commitment to adaptive management and prescribed monitoring for common conservation objectives; other aspects of planning for adaptive management were often lacking, despite strong support for adaptive management in the conservation planning literature. To better address refuge-specific threats, we recommend that revised plans explicitly match identified refuge issues with prescriptions, particularly for under-represented concerns such as novel pests and pathogens. We recommend incorporating triggers into monitoring frameworks and specifying actions that will occur when threshold values are reached to improve support for adaptive management. Revised CCPs should better reflect work that refuges already undertake to extend conservation objectives beyond their borders and better engage with regional conservation efforts to continue this work. More thorough landscape-scale threat assessments and explicit prioritization of planned actions would further improve conservation

  6. A Comprehensive Approach to Bi-National Regional Energy Planning in the Pacific Northwest

    SciTech Connect

    Matt Morrison

    2007-12-31

    The Pacific NorthWest Economic Region, a statutory organization chartered by the Northwest states of Alaska, Washington, Idaho, Montana, and Oregon, and the western Canadian provinces of British Columbia, Alberta, and the Yukon through its Energy Working Group launched a bi-national energy planning initiative designed to create a Pacific Northwest energy planning council of regional public/private stakeholders from both Canada and the US. There is an urgent need to deal with the comprehensive energy picture now before our hoped for economic recovery results in energy price spikes which are likely to happen because the current supply will not meet predicted demand. Also recent events of August 14th have shown that our bi-national energy grid system is intricately interdependent, and additional planning for future capacity is desperately needed.

  7. Alzheimer's disease research in the context of the national plan to address Alzheimer's disease.

    PubMed

    Snyder, Heather M; Hendrix, James; Bain, Lisa J; Carrillo, Maria C

    2015-01-01

    In 2012, the first National Plan to Address Alzheimer's Disease in the United States (U.S.) was released, a component of the National Alzheimer's Project Act legislation. Since that time, there have been incremental increases in U.S. federal funding for Alzheimer's disease and related dementia research, particularly in the areas of biomarker discovery, genetic link and related biological underpinnings, and prevention studies for Alzheimer's. A central theme in each of these areas has been the emphasis of cross-sector collaboration and private-public partnerships between government, non-profit organizations and for-profit organizations. This paper will highlight multiple private-public partnerships supporting the advancement of Alzheimer's research in the context of the National Plan to Address Alzheimer's. PMID:26096321

  8. Approach and status for a unified national plan for satellite remote sensing research and development

    NASA Technical Reports Server (NTRS)

    Butera, Kristine; Okerson, David J.

    1987-01-01

    Public Law 98-365, the Land Remote-Sensing Commercialization Act of 1984, requires that the Secretary of the Department of Commerce and the Administrator of the National Aeronautics and Space Administration 'shall, within one year after the date of the Law's enactment and biennially thereafter, jointly develop and transmit to the Congress a report that includes (1) a unified national plan for remote-sensing research and development applied to the earth and its atmosphere; (2) a compilation of progress in the relevant on-going research and development activities of Federal agencies; and (3) an assessment of the state of our knowledge of the Earth and its atmosphere, the needs for additional research (including research related to operational Federal remote-sensing space programs), and opportunities available for further progress'. NASA and NOAA have organized a series of public forums to encourage interest and discussion of the national plan.

  9. 78 FR 76855 - Record of Decision for the General Management Plan/Wilderness Study, Fort Pulaski National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ...Pursuant to the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of the Record of Decision (ROD) for the General Management Plan/Wilderness Study (GMP/WS) for Fort Pulaski National Monument (national monument). On September 30, 2013, the Regional Director, Southeast Region, approved the ROD for the...

  10. 78 FR 45871 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    .... The Site was proposed for placement on the National Priorities List (NPL) on December 30, 1982 (47 FR 58476 (1982-12-30)), and listed on the NPL on September 8, 1983 (48 FR 40658 (1983-09-08)). Currently...: Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351;...

  11. 75 FR 33724 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ... National Priorities List. 60 FR 55466 (Nov. 1, 1995). As described in 300.425(e)(3) of the NCP, a portion....S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923; 3 CFR, 1987 Comp., p. 193. Appendix B-- 0 2. Table 1 of Appendix B to Part 300 is...

  12. 78 FR 11589 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    .... EPA proposed the STP site to the National Priorities List (NPL) on October 15, 1984 (49 FR 40320), and added it to the final list on August 30, 1990 (55 FR 35502). In 1985, Kerr-McGee entered into an....O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp., p....

  13. 78 FR 70231 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... Notice of Policy Change: Deletion of Sites Listed on the National Priorities List, (51 FR 21054) on June... September 18, 1985 (FR 50 37950) and finalized on June 10, 1986 (FR 51 21054). EPA, IDEM, and the three...: Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351;...

  14. Molecular characterization of HIV type 1 strains from newly diagnosed patients in Cyprus (2007-2009) recovers multiple clades including unique recombinant strains and lack of transmitted drug resistance.

    PubMed

    Kousiappa, Ioanna; Achilleos, Charis; Hezka, Johana; Lazarou, Yiota; Othonos, Katerina; Demetriades, Ioannis; Kostrikis, Leondios G

    2011-11-01

    HIV-1 evolution generates substantial genetic diversity among isolates, the majority of which are represented in areas where multiple strains cocirculate. A heterogeneous genetic HIV-1 pool has been found in Cyprus, directing us to determine the dynamics of the local HIV-1 infection by characterizing strains isolated from 74 subjects during 2007-2009, representing 88% of the known-living HIV-1-infected population, of whom 53 are newly diagnosed therapy-naive patients and 21 are chronic patients, according to the European HIV Resistance guidelines. Near full-length genome sequences were amplified by RT-nested PCR using diluted RNA from all HIV-1 seropositives and sequenced using a newly designed assay. Resistant mutations were not found among the population of the newly diagnosed therapy-naive patients either to protease, reverse transcriptase, or integrase inhibitors. Phylogenetic analyses indicated subtype B as the main subtype (48.6%), followed by subtype A (18.9%), subtype C (10.8%), CRF02_AG (8.1%), CRF11_cpx (2.7%), and (sub)subtype F1 and CRF37_cpx (1.4% each). Six HIV-1 isolates (8.1%) were not classified in any pure (sub)subtype or circulating recombinant form (CRF). Complete phylogenetic and bootscanning analyses revealed that each isolate had a new, unique recombinant pattern and is distinct from all other CRFs or unique recombinant forms (URFs) reported so far. Two of the six isolates have the same mosaic pattern. Analogous to results of the earlier epidemiological studies, this study expands on the HIV-1 sequence database and reveals the high degree of diversity of HIV-1 infection in Cyprus. PMID:21453134

  15. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    SciTech Connect

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  16. Profile: the National Documentation Centre for Family Planning of India's National Institute of Health and Family Welfare.

    PubMed

    1991-12-01

    In 1974, the National Documentation Centre for Family Planning was founded at India's National Institute of Health and Family Welfare with funds from the government and the UN Population Fund (UNFPA) to provide reliable population information to policy makers, planners, administrators for program development as well as to academics, researchers, students, and social workers engaged in population issues. Data collected from states and districts by the Ministry of Health and Family Welfare are disseminated through publications. The Centre receives documents from other Indian research entities and from foreign bodies. The existing collection consists of 40,000 books and monographs, 10,000 periodicals and journals, 450 current journals, 2000 institutional publications, 1000 annual reports, and 5000 fugitive material items. A data base containing this collected material has the purpose of generating various publications, and full copies of originals are provided at request. WHO designated the Centre a resource center for primary health care information. It is a linchpin of the Asia-Pacific POPIN network. Requests are frequent for information on family welfare program management. Dissemination includes information packages, annotated bibliographies, synthesized information, case studies, and field experience reports. The staff includes subject specialists, communication experts, and software and management specialists. 54 health and family welfare training centers have been involved in information activities since 1985. Exchange of information with population research centers has started by means of computer networking. Local area networks are developed with science libraries of major cities. DELNET (Delhi Library Network) launched a resource-sharing effort of health and family planning libraries. The creation of a National Population Information Database is also planned by the establishment of POPIN-India. PMID:12286547

  17. Sector Activities and Lessons Learned Around Initial Implementation of the United States National Physical Activity Plan

    PubMed Central

    Evenson, Kelly R.; Satinsky, Sara B.

    2016-01-01

    Background National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. Methods During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. Results The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. Conclusions These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans. PMID:24176800

  18. Los Alamos National Laboratory transuranic waste quality assurance project plan. Revision 1

    SciTech Connect

    1997-04-14

    This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste.

  19. 76 FR 20347 - Release of Draft Integrated Review Plan for the National Ambient Air Quality Standards for Lead

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... (75 FR 8934). The draft IRP is being made available for consultation with CASAC and for public comment... AGENCY Release of Draft Integrated Review Plan for the National Ambient Air Quality Standards for Lead... National Ambient Air Quality Standards for Lead (draft IRP). This document contains the plans for...

  20. Integrating the Poor through e-Governance: A Case Study of the National e-Governance Plan in India

    ERIC Educational Resources Information Center

    Dasgupta, Shib Shankar

    2010-01-01

    This dissertation examines the adoption and implementation mechanism of the national e-Governance plan in the regional state of West Bengal in India. The questions that this dissertation seek to illuminate are (i) the various potentials and challenges in integrating the ordinary citizens in the implementation of the national e-Governance plan in…

  1. 77 FR 3635 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... America Fund: A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support et al., published at 76 FR 73830, November 29, 2011... Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for...

  2. An evaluation of resource inventory and monitoring program used in national forest planning

    NASA Astrophysics Data System (ADS)

    Morrison, Michael L.; Marcot, Bruce G.

    1995-01-01

    The National Forest Management Act (1976) specifies that multiresource inventories be conducted to provide baseline data for development and, later, monitoring of national forest management plans. This mandate entails the most ambitious and complex resource planning effort ever attempted. In this paper we evaluate the structure and use of current inventory-monitoring programs and recommend a framework for gathering data to improve national forest planning. Current national guidelines are general and provide only basic directions to forest-level planners. Forest inventories have traditionally concentrated on timber. Although these inventories are often well designed, the questions we are now asking about forest resources have outgrown these methods. Forest management is impeded by general confusion over definitions of resources and the interactions among them. We outline a simple classification scheme that centers on identification of basic ecosystem elements that can be readily measured. Furthermore, spatial and temporal scales must be considered in the design of inventory-monitoring programs. The concept of ecological indicators is reviewed, and caution is advised in their use. Inventory-monitoring programs should be goal-directed and based on as rigorous a statistical design as possible. We also review fundamental issues of variable selection, validation, and sampling bias. We conclude by developing a flexible inventory-monitoring program that is designed to provide information on individual characteristics of the environment, rather than being based on fixed definitions of resources.

  3. A Resiliency Action Plan for the National Renewable Energy Laboratory: May 23, 2014 -- June 5, 2015

    SciTech Connect

    Vogel, J; Wagner, C.; Renfrow, S.

    2015-09-03

    The second stage in a two-stage project called the National Renewable Energy Laboratory (NREL) Climate Change Resiliency and Preparedness (CCRP) project is summarized in this resiliency action plan. This CCRP pilot project was funded by the U.S. Department of Energy's Sustainability Performance Office and launched in winter 2014. The resiliency action plan begins where the previous stage of the project -- the vulnerability assessment -- ended. This report discusses resiliency options to reduce the risk of the highest risk vulnerabilities that were identified in the NREL vulnerability assessment.

  4. An Assessment of the Implementation of National Development Plans in Kenya: The Case of Education Sector Programmes

    ERIC Educational Resources Information Center

    Gor, Seth Omondi; Osoro, Kennedy O.

    2013-01-01

    This study assessed the success or failure of plan implementation in Kenya by investigating the extent to which planned estimates for educational projects were actually attained. Using six sets of five-year national development plans, we calculated an implementation ratio for each program showing actual expenditure as a ratio of planned…

  5. 78 FR 20299 - National Institute on Disability and Rehabilitation Research; Long-Range Plan for Fiscal Years...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ...The Assistant Secretary for Special Education and Rehabilitative Services announces the publication of the final Long- Range Plan for Fiscal Years (FY) 2013-2017 (Plan) for the National Institute on Disability and Rehabilitation Services (NIDRR). This Plan provides an overview of NIDRR's goals and objectives, identifies contributions that NIDRR research has made to improve the lives of......

  6. 75 FR 27286 - McKelvie Geographic Area Range Allotment Management Planning on the Samuel R. McKelvie National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ..., 2010 (FR Vol. 75, No. 48, p. 11882) concerning the range allotment management planning on the McKelvie... Forest Service McKelvie Geographic Area Range Allotment Management Planning on the Samuel R. McKelvie... planning on the Samuel R. McKelvie National Forest. Dated: May 3, 2010. Terry T. Baker, District...

  7. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject.

  8. Planning and design of Berg-en-Dal, a new camp in Kruger National Park

    NASA Astrophysics Data System (ADS)

    van Riet, W. F.; Cooks, J.

    1990-05-01

    The premise of this article is that the planning and design of new rest camps in conservation areas should be based on ecological principles in such a way that the plant ecology within the camp be an integral part and extension of the natural ecology of its immediate vicinity. This is desirable so that visitors to the camp will be provided not only with facilities for resting, eating, and sleeping, but also be able to enjoy and study the natural environment in a relaxed atmosphere. The Berg-en-Dal rest camp, which was established in Kruger National Park, was planned in such a way and designed according to the principles outlined by the authors in a companion article. The planning included six zones: a control zone, day visitor zone, overnight visitor zone, staff accommodation zone, recreation zone, and service zone. The point is stressed that plant species selected to be used as additional vegetation to those already growing in the camp were endemic to the nine landscape facets identified in the camp. The design allowed for separation of the various land-use zones in such a way that they would complement each other rather than be a hindrance to each other. The camp has been built according to the plans included in this article and has proved to be a great success. The conclusion is drawn that the planning principles are sound and should be used in the future for the planning and design of rest camps for conservation areas in South Africa.

  9. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  10. Oil-spill contingency planning: National status. A report to the President

    SciTech Connect

    Not Available

    1990-10-01

    In response to the Exxon Valdez oil disaster, President Bush directed the National Response Team (NRT) to take a fresh look at America's readiness to respond to oil spills of national significance in the countries' major ports and inland waterways. The report was done in a compressed timeframe to provide a representative picture of oil spill planning and preparedness across the country. To accomplish this task, the United States Coast Guard and the United States Environmental Protection Agency provided a leadership role for the NRT which directed federal, regional, and local offices to evaluate the effectiveness of their oil spill contingency plans. The report represents the combined efforts of hundreds of individuals, including Coast Guard and EPA On-Scene Coordinators.

  11. Plan for increasing public participation in cleanup decisions for the Los Alamos National Laboratory

    SciTech Connect

    Not Available

    1995-01-01

    This document describes a plan for involving the public in decisions related to cleaning up sites suspected of being contaminated with chemicals or radioactivity at Los Alamos National Laboratory. In this section we describe the purpose of the Environmental Remediation Project, our past efforts to communicate with the northern New Mexico community, and the events that brought about our realization that less traditional, more innovative approaches to public involvement are needed.

  12. San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition

    NASA Technical Reports Server (NTRS)

    Werth, L. F. (Principal Investigator)

    1981-01-01

    The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.

  13. Nuisance Wildlife Education and Prevention Plan for the Oak Ridge National Laboratory

    SciTech Connect

    Giffen, Neil R

    2007-05-01

    This document outlines a plan for management of nuisance wildlife at the Oak Ridge National Laboratory (ORNL). Nuisance wildlife management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; and law enforcement. This plan covers the following subjects: (1) roles and responsibilities of individuals, groups, and agencies; (2) the general protocol for reducing nuisance wildlife problems; and (3) species-specific methodologies for resolving nuisance wildlife management issues for mammals, birds, snakes, and insects. Achievement of the objectives of this plan will be a joint effort between the Tennessee Wildlife Resources Agency (TWRA); U. S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS)-Wildlife Services (WS); and ORNL through agreements between TWRA and the U.S. Department of Energy (DOE); DOE and UT-Battelle, LLC; and UT-Battelle, LLC; and USDA, APHIS-WS.

  14. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  15. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  16. Site inspection health and safety plan. Bennett Army National Guard Facility Bennett, Colorado. Final report

    SciTech Connect

    1995-01-26

    This Health and Safety Plan (HSP) is based on the Remedial Investigation/Feasibility Study (RI/FS) HSP originally developed by R.L. Stollar Associates, Inc. in 1991 for use at the Bennett Army National Guard Facility (BANGF). Subsequent to the initial preparation of the plan, funding to perform the RI/FS at BANGF was not provided. The original RI/FS HSP has been modified to address the potential health and safety hazards associated with conducting a Site Inspection (SI) of this facility. The HSP meets the requirements of Title 29 of the Code of Federal Regulations, Section 1910.120 (29 CFR 1910.120) and 29 CFR 1910.134. Compliance with this HSP for BANGF is required of all field personnel, including subcontractors conducting investigations and waste management identified in the BANGF SI Sampling and Analysis Plan.

  17. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    SciTech Connect

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  18. Promoting Your e-Books: Lessons from the UK JISC National e-Book Observatory

    ERIC Educational Resources Information Center

    Lonsdale, Ray; Armstrong, Chris

    2010-01-01

    Purpose: The purpose of this paper is to describe the findings from the qualitative strand of the National e-Book Observatory (2007-2009) project, relating to the promotion of e-textbooks in UK universities by the library, academics and publishers. A complementary paper on the ways in which students and academics locate e-books provided by their…

  19. Cross-National Prevalence and Risk Factors for Suicidal Ideation, Plans, and Attempts

    PubMed Central

    Nock, Matthew K.; Borges, Guilherme; Bromet, Evelyn J.; Alonso, Jordi; Angermeyer, Matthias; Beautrais, Annette; Bruffaerts, Ronny; Chiu, Wai Tat; de Girolamo, Giovanni; Gluzman, Semyon; de Graaf, Ron; Gureje, Oye; Haro, Josep Maria; Huang, Yueqin; Karam, Elie; Kessler, Ronald C.; Lepine, Jean Pierre; Levinson, Daphna; Medina-Mora, Maria Elena; Ono, Yutaka; Posada-Villa, José; Williams, David R.

    2008-01-01

    Background Suicide is a leading cause of death world-wide; however, the prevalence and risk factors for the immediate precursors to suicide: suicidal ideation, plans and attempts, are not well-known, especially in developing countries. Aims To report on the prevalence and risk factors for suicidal behaviors across 17 countries. Method 84,850 adults were interviewed regarding suicidal behaviors and socio-demographic and psychiatric risk factors. Results The cross-national lifetime prevalence (standard error) of suicidal ideation, plans, and attempts is 9.2% (0.1), 3.1% (0.1), and 2.7% (0.1). Across all countries, 60% of transitions from ideation to plan and attempt occur within the first year after ideation onset. Consistent cross-national risk factors included being: female, younger, less educated, unmarried, and having a mental disorder. Interestingly, the strongest diagnostic risk factors were mood disorders in developed countries but impulse-control disorders in developing countries. Conclusion Despite cross-national variability in prevalence, there is strong consistency in the characteristics of and risk factors for suicidal behaviors. These findings have significant implications for the prediction and prevention of suicidal behaviors. PMID:18245022

  20. Developing a national tiger action plan for The Union of Myanmar.

    PubMed

    Lynam, Antony J; Khaing, Saw Tun; Zaw, Khin Maung

    2006-01-01

    A century ago, tigers were considered pests in Myanmar. Hunters claimed thousands, yet populations persisted. In the past century, because of habitat loss and prey depletion, coupled with the recent demand for traditional medicines, tiger populations have been reduced to a few hundred individuals. As a first step toward long-term planning for tigers, and to guide efforts to increase protected area coverage, the Myanmar government in 1998 initiated a project to develop a revised National Tiger Action Plan. Extensive surveys confirmed tigers in only 4 of 17 survey locations. Significant populations are thought to persist in the far North and far South of the country, where large, intact forests offer the potential for tiger recovery. With partnerships and collaborations, tiger populations can be protected in the short term (<5 years) by expanding protected areas and corridors, mobilizing enforcement staff to reduce poaching of tigers and prey, and amending existing wildlife legislation in accordance with international laws. Over the long term (5-20 years), recovery of Myanmar's tiger populations will depend on increasing support from local people, zoning tiger areas to reduce habitat loss and disturbance, and maintaining connectivity of existing national and transboundary forests. This article reviews the development of a new National Tiger Action Plan for the Union of Myanmar and discusses a blueprint for conservation measures aimed at saving tigers from extinction. PMID:16362487