The test program for the Bohunice A-1 Reactor is described and the test results to date are summarized, (JWR)
Energy Citations Database
The extensive preparatory work preceding the startup of the Bohunice A-1 Reactor is described. The technical problems encountered during the reactor startup are discussed. (JWR)
Activities associated with the startup of the Bohunice A-1 Reactor are summarized. The reactor physics parameters obtained during the approach to initial crtticality are presented. (JWR)
The most important research carried out at the Nuclear Research Institute in connection with construction and testing of the first Czechoslovakian A-1 nuclear power station is described. Attention is given to the physical tests on the KS-150 reactor and cooperation in studies on the ...
The fuel elements of the Bohunice A-1 reactor are replaced continuously during full power operation. The design of the charging machine for the refueling operation is described, The experience gained from charging machine testing is discussed. (JWR)
...disposal, spent nuclear fuel generated by the nuclear power plant or plants located on the same site...incurred in connection with the disposal of spent nuclear fuel under the Nuclear Waste Policy Act of 1982 (Pub. L. 97-425)....
Code of Federal Regulations, 2011