Science.gov

Sample records for acceptance apha energy

  1. Public Acceptance of Nuclear Energy in Mexico

    SciTech Connect

    Ramirez-Sanchez, Jose R.; Alonso, Gustavo; Palacios, H. Javier

    2006-07-01

    The nuclear energy is attracting renewed interest of public and policy makers due to his potential role in long term strategies aiming to reduce the risk of global warming and in a more general, to carry out sustainable policies, however, any project of nuclear nature arise concerns about the risks associated with the release of radioactivity during accident conditions, radioactive waste disposal and nuclear weapons proliferation. Then in light of the likeliness for a new nuclear project in Mexico, is necessary to design a strategy to improve the social acceptance of nuclear power. This concern is been boarding since the environmental and economic point of view. The information that can change the perception of nuclear energy towards increase public acceptance, should be an honest debate about the benefits of nuclear energy, of course there are questions and they have to be answered, but in a realistic and scientific way: So thinking in Mexico as a first step it is important to communicate to the government entities and political parties that nuclear energy is a proven asset that it is emission free and safe. Of course besides the guarantee of a proven technology, clean and safe relies the economic fact, and in Mexico this could be the most important aspect to communicate to key people in government. Based in the Laguna Verde survey it is clear that we have to find the adequate means to distribute the real information concerning nuclear technology to the public, because the results shows that Mexican people does not have complete information about nuclear energy, but public can support it when they have enough information. From the IAEA study we can say that in Mexico public acceptance of nuclear energy it s not so bad, is the highest percentage of acceptance of nuclear technology for health, considering benefits to the environment Mexican opposition to build new plants is the second less percentage, and generally speaking 60% of the people accept somehow nuclear

  2. Individual and combined roles of the master regulators AphA and LuxR in control of the Vibrio harveyi quorum-sensing regulon.

    PubMed

    van Kessel, Julia C; Rutherford, Steven T; Shao, Yi; Utria, Alan F; Bassler, Bonnie L

    2013-02-01

    Bacteria use a chemical communication process called quorum sensing to control transitions between individual and group behaviors. In the Vibrio harveyi quorum-sensing circuit, two master transcription factors, AphA and LuxR, coordinate the quorum-sensing response. Here we show that AphA regulates 167 genes, LuxR regulates 625 genes, and they coregulate 77 genes. LuxR strongly controls genes at both low cell density and high cell density, suggesting that it is the major quorum-sensing regulator. In contrast, AphA is absent at high cell density and acts to fine-tune quorum-sensing gene expression at low cell density. We examined two loci as case studies of coregulation by AphA and LuxR. First, AphA and LuxR directly regulate expression of the genes encoding the quorum-regulatory small RNAs Qrr2, Qrr3, and Qrr4, the consequence of which is a specifically timed transition between the individual and the group life-styles. Second, AphA and LuxR repress type III secretion system genes but at different times and to different extents. The consequence of this regulation is that type III secretion is restricted to a peak at mid-cell density. Thus, the asymmetric production of AphA and LuxR coupled with differences in their strengths and timing of target gene regulation generate a precise temporal pattern of gene expression. PMID:23204455

  3. Individual and Combined Roles of the Master Regulators AphA and LuxR in Control of the Vibrio harveyi Quorum-Sensing Regulon

    PubMed Central

    van Kessel, Julia C.; Rutherford, Steven T.; Shao, Yi; Utria, Alan F.

    2013-01-01

    Bacteria use a chemical communication process called quorum sensing to control transitions between individual and group behaviors. In the Vibrio harveyi quorum-sensing circuit, two master transcription factors, AphA and LuxR, coordinate the quorum-sensing response. Here we show that AphA regulates 167 genes, LuxR regulates 625 genes, and they coregulate 77 genes. LuxR strongly controls genes at both low cell density and high cell density, suggesting that it is the major quorum-sensing regulator. In contrast, AphA is absent at high cell density and acts to fine-tune quorum-sensing gene expression at low cell density. We examined two loci as case studies of coregulation by AphA and LuxR. First, AphA and LuxR directly regulate expression of the genes encoding the quorum-regulatory small RNAs Qrr2, Qrr3, and Qrr4, the consequence of which is a specifically timed transition between the individual and the group life-styles. Second, AphA and LuxR repress type III secretion system genes but at different times and to different extents. The consequence of this regulation is that type III secretion is restricted to a peak at mid-cell density. Thus, the asymmetric production of AphA and LuxR coupled with differences in their strengths and timing of target gene regulation generate a precise temporal pattern of gene expression. PMID:23204455

  4. Values, perceived risks and benefits, and acceptability of nuclear energy.

    PubMed

    de Groot, Judith I M; Steg, Linda; Poortinga, Wouter

    2013-02-01

    We examined how personal values and perceptions of risks and benefits are associated with the acceptability of nuclear energy (NE). A theoretical model is tested in which beliefs about the risks and benefits of NE mediate the relationship between values and acceptability. The results showed that egoistic values are positively related to the perceived benefits and acceptability of NE. In contrast, altruistic and biospheric values were positively related to the perceived risks of NE. Although it has been argued that NE may help to combat climate change through lower CO(2) emissions, these environmental benefits were not acknowledged by people with strong biospheric values. Furthermore, results confirmed that the more risks respondents perceived, the less they were inclined to accept NE. In contrast, the more a person believed that NE has beneficial consequences, the more acceptable NE was. Finally, as expected, perceived risks and benefits were found to partly mediate the relationship between personal values and acceptability. We discuss the theoretical and practical implications of these findings. PMID:22642255

  5. Strain-Based Acceptance Criteria for Energy-Limited Events

    SciTech Connect

    Spencer D. Snow; Dana K. Morton

    2009-07-01

    The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code was primarily written with stress-based acceptance criteria. These criteria are applicable to force, displacement, and energy-controlled loadings and ensure a factor of safety against failure. However, stress-based acceptance criteria are often quite conservative for one time energy-limited events such as accidental drops and impacts. For several years, the ASME Working Group on Design of Division 3 Containments has been developing the Design Articles for Section III, Division 3, “Containments for Transportation and Storage of Spent Nuclear Fuel and High-Level Radioactive Material and Waste,” and has wanted to establish strain-based acceptance criteria for accidental drops of containments. This Division 3 working group asked the Working Group on Design Methodology (WGDM) to assist in developing these strain-based acceptance criteria. This paper discusses the current proposed strain-based acceptance criteria, associated limitations of use, its background development, and the current status.

  6. Development of an acceptance test for solar energy systems

    NASA Astrophysics Data System (ADS)

    Joncich, D. M.; Johnson, D. L.

    1981-06-01

    This report describes the development and field evaluation of a short-duration procedure and an instrumentation package for testing whether a newly installed solar energy system is performing to design specifications. The U.S. Army Construction Engineering Research Laboratory: (1) defined a general solar system schematic and identified its major components; (2) developed test procedures for determining the thermal performance of these components; (3) bought and programmed equipment to perform the prescribed component test and to produce the test data; (4) subjected the acceptance test concept and instrumentation package to a field evaluation at a newly installed Army solar energy system; and (5) incorporated the results of the field evaluation as modifications to the solar acceptance test. This report concludes that a simple, quantitative test of short duration can determine whether a newly installed solar system is operating as specified. The results of the research have revealed the potential for performing such a test with low-cost metering installed at the time of building construction.

  7. High energy resolution, high angular acceptance crystal monochromator

    DOEpatents

    Alp, Ercan E.; Mooney, Timothy M.; Toellner, Thomas

    1996-06-04

    A 4-bounce dispersive crystal monochromator reduces the bandpass of synchrotron radiation to a 10-50 meV range without sacrificing angular acceptance. The monochromator includes the combination of an asymmetrical channel-cut single crystal of lower order reflection and a symmetrical channel-cut single crystal of higher order reflection in a nested geometric configuration. In the disclosed embodiment, a highly asymmetrically cut (.alpha.=20) outer silicon crystal (4 2 2) with low order reflection is combined with a symmetrically cut inner silicon crystal (10 6 4) with high order reflection to condition a hard x-ray component (5-30 keV) of synchrotron radiation down to the .mu.eV-neV level. Each of the crystals is coupled to the combination of a positioning inchworm and angle encoder via a respective rotation stage for accurate relative positioning of the crystals and precise energy tuning of the monochromator.

  8. High energy resolution, high angular acceptance crystal monochromator

    DOEpatents

    Alp, E.E.; Mooney, T.M.; Toellner, T.

    1996-06-04

    A 4-bounce dispersive crystal monochromator reduces the bandpass of synchrotron radiation to a 10-50 meV range without sacrificing angular acceptance. The monochromator includes the combination of an asymmetrical channel-cut single crystal of lower order reflection and a symmetrical channel-cut single crystal of higher order reflection in a nested geometric configuration. In the disclosed embodiment, a highly asymmetrically cut ({alpha}=20) outer silicon crystal (4 2 2) with low order reflection is combined with a symmetrically cut inner silicon crystal (10 6 4) with high order reflection to condition a hard x-ray component (5--30 keV) of synchrotron radiation down to the {micro}eV-neV level. Each of the crystals is coupled to the combination of a positioning inchworm and angle encoder via a respective rotation stage for accurate relative positioning of the crystals and precise energy tuning of the monochromator. 7 figs.

  9. High-energy resolution, high-angular acceptance crystal monochromator

    SciTech Connect

    Toellner, T.S.; Mooney, T.; Alp, E.E.; Shastri, S.

    1992-06-01

    The design principles, construction and characterization of a 4- bounce dispersive crystal monochromator is discussed. This monochromator is designed to reduce the bandpass of synchrotron radiation to 10--50 meV level, without sacrificing angular acceptance. This is achieved by combining an asymmetrically-cut, low order reflection with a symmetrically-cut, high order reflection in a nested configuration. This monochromator is being used as a beam conditioner for nuclear resonant scattering of synchrotron radiation to produce x-rays with {mu}eV{minus}neV resolution in the hard x-ray regime.

  10. High-energy resolution, high-angular acceptance crystal monochromator

    SciTech Connect

    Toellner, T.S.; Mooney, T.; Alp, E.E. ); Shastri, S. . Dept. of Applied Physics)

    1992-06-01

    The design principles, construction and characterization of a 4- bounce dispersive crystal monochromator is discussed. This monochromator is designed to reduce the bandpass of synchrotron radiation to 10--50 meV level, without sacrificing angular acceptance. This is achieved by combining an asymmetrically-cut, low order reflection with a symmetrically-cut, high order reflection in a nested configuration. This monochromator is being used as a beam conditioner for nuclear resonant scattering of synchrotron radiation to produce x-rays with [mu]eV[minus]neV resolution in the hard x-ray regime.

  11. Wind Power Siting: Public Acceptance and Land Use; NREL (National Renewable Energy Laboratory)

    SciTech Connect

    Tegen, Suzanne

    2015-06-17

    Suzanne Tegen presented this information as part of the June 17, 2015 WINDExchange webinar: Overcoming Wind Siting Challenges III: Public Acceptance and Land Use. This presentation provides an overview of current NREL research related to wind energy deployment considerations, the DOE Wind Vision as it relates to public acceptance and land use, why public acceptance of wind power matters, where the U.S. wind resource is best, and how those rich resource areas overlay with population centers.

  12. On the perception and acceptability of nuclear energy in Korea

    SciTech Connect

    Kim, Jong Seok

    1997-12-01

    With the widespread recognition of the lack of indigenous energy supplies, there continues to be a general agreement that nuclear energy is necessary and will increase in importance as an energy source for Korea. In spite of that, we are faced with the difficulties of opening new sites and siting new units beside reactors on the existing sites. It is of no use to say that enhancing public understanding could be a prerequisite for implementing the related policies as well as nuclear energy supplies. This paper examines the relationships among the responses identified in opinion polls and tries to predict how attitudes could be changed.

  13. 78 FR 78353 - Hydro Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hydro Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 15, 2013, Hydro Green Energy, LLC, filed...

  14. 78 FR 27962 - Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for..., the Archon Energy 1, Inc., filed an application for a preliminary permit, pursuant to section 4(f)...

  15. 77 FR 2974 - Longview Energy Exchange, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Longview Energy Exchange, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 3, 2012, Longview Energy Exchange,...

  16. Understanding and accepting fusion as an alternative energy source

    SciTech Connect

    Goerz, D.A.

    1987-12-10

    Fusion, the process that powers our sun, has long promised to be a virtually inexhaustible source of energy for mankind. No other alternative energy source holds such bright promise, and none has ever presentd such formidable scientific and engineering challenges. Serious research efforts have continued for over 30 years in an attempt to harness and control fusion here on earth. Scientists have made considerable progress in the last decade toward achieving the conditions required for fusion power, and recent experimental results and technological progress have made the scientific feasibility of fusion a virtual certainty. With this knowledge and confidence, the emphasis can now shift toward developing power plants that are practical and economical. Although the necessary technology is not in hand today, the extension to an energy producing system in 20 years is just as attainable as was putting a man on the moon. In the next few decades, the world's population will likely double while the demand for energy will nearly quadruple. Realistic projections show that within the next generation a significant fraction of our electric power must come from alternative energy sources. Increasing environmental concerns may further accelerate this timetable in which new energy sources must be introduced. The continued development of fusion systems to help meet the energy needs of the future will require greater public understanding and support of this technology. The fusion community must do more to make the public aware of the fact that energy is a critical international issue and that fusion is a viable and necessary energy technology that will be safe and economical. 12 refs., 8 figs.

  17. 77 FR 5787 - Consumers Energy Company, Detroit Edison Company; Notice of Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Consumers Energy Company, Detroit Edison Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been...

  18. 76 FR 67726 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 13, 2011, Natural Currents...

  19. 76 FR 71004 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On July 14, 2011, Natural Currents...

  20. Understanding Energy Code Acceptance within the Alaska Building Community

    SciTech Connect

    Mapes, Terry S.

    2012-02-14

    This document presents the technical assistance provided to the Alaska Home Financing Corporation on behalf of PNNL regarding the assessment of attitudes toward energy codes within the building community in Alaska. It includes a summary of the existing situation and specific assistance requested by AHFC, the results of a questionnaire designed for builders surveyed in a suburban area of Anchorage, interviews with a lender, a building official, and a research specialist, and recommendations for future action by AHFC.

  1. Risk perception and public acceptance toward a highly protested Waste-to-Energy facility.

    PubMed

    Ren, Xiangyu; Che, Yue; Yang, Kai; Tao, Yun

    2016-02-01

    The application of Waste-to-Energy treatment in Municipal Solid Waste faces strong protest by local communities, especially in cities with high population densities. This study introduces insight into the public awareness, acceptance and risk perception toward Waste-to-Energy through a structured questionnaire survey around a Waste-to-Energy facility in Shanghai, China. The Dichotomous-Choice contingent valuation method was applied to study the willingness to accept of residents as an indicator of risk perception and tolerance. The factors influencing risk perception and the protest response choice were analyzed. The geographical distributions of the acceptance of Waste-to-Energy facility and protest response were explored using geographical information systems. The findings of the research indicated an encouraging vision of promoting Waste-to-Energy, considering its benefits of renewable energy and the conservation of land. A high percentage of protest willingness to accept (50.94%) was highlighted with the effect of income, opinion about Waste-to-Energy, gender and perceived impact. The fuzzy classification among people with different opinions on compensation (valid 0, positive or protest willingness to accept) revealed the existing yet rejected demand of compensation among protesters. Geographical distribution in the public attitude can also be observed. Finally significant statistical relation between knowledge and risk perception indicates the need of risk communication, as well as involving public into whole management process. PMID:26577458

  2. 75 FR 65312 - Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... Energy Regulatory Commission Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Interventions October 15, 2010. On August 9, 2010, Vortex... average annual generation of 0.788 gigawatt-hours. Applicant Contact: Gus Simiao, CEO, Vortex Hydro...

  3. The Nuclear Energy Option for the U.S.--How Far Are We from Public Acceptance?

    SciTech Connect

    Biedscheid, J.A.; Devarakonda, M.

    2004-10-03

    The recent rise of oil and gasoline prices accompanied by reluctant acknowledgement that traditional sources of energy are limited has renewed public interest in renewable energy sources. This perspective on energy is focusing attention on and facilitating acceptance of alternative energy concepts, such as solar, wind, and biomass. The nuclear energy alternative, while clean with potentially abundant fuel supplies and associated with low costs, is burdened with the frequently negative public opinion reserved for things nuclear. Coincident with the heightened examination of alternative energy concepts, 2004 marks the 25-year anniversary of the Three Mile Island accident. Since this pivotal accident in 1979, no new reactor licenses have been granted in the U.S. The resolution of the issues of nuclear waste management and disposition are central to and may advance public discussions of the future use of nuclear energy. The U.S. Department of Energy (DOE) is currently preparing the licensing application for Yucca Mountain, which was designated in 2003 as the site for a high-level waste and spent nuclear fuel repository in the U.S. The DOE also has been operating a deep geologic repository for the permanent disposal of transuranic (TRU) waste since 1999. The operational status of the Waste Isolation Pilot Plant (WIPP) as a repository for TRU waste was successfully realized along with the lesson learned that stakeholder trust and acceptance are as critical to the success of a repository program as the resolution of technical issues and obtaining regulatory approvals. For the five years of its operation and for decades prior, the challenge of attaining public acceptance of the WIPP has persisted for reasons aligned with the opposition to nuclear energy. Due to this commonality, the nuclear waste approach to public acceptance, with its pros and cons, provides a baseline for the examination of an approach for the public acceptance of nuclear energy in the U.S. This paper

  4. A high resolution, broad energy acceptance spectrometer for laser wakefield acceleration experiments.

    PubMed

    Sears, Christopher M S; Cuevas, Sofia Benavides; Schramm, Ulrich; Schmid, Karl; Buck, Alexander; Habs, Dieter; Krausz, Ferenc; Veisz, Laszlo

    2010-07-01

    Laser wakefield experiments present a unique challenge in measuring the resulting electron energy properties due to the large energy range of interest, typically several 100 MeV, and the large electron beam divergence and pointing jitter >1 mrad. In many experiments the energy resolution and accuracy are limited by the convolved transverse spot size and pointing jitter of the beam. In this paper we present an electron energy spectrometer consisting of two magnets designed specifically for laser wakefield experiments. In the primary magnet the field is produced by permanent magnets. A second optional electromagnet can be used to obtain better resolution for electron energies above 75 MeV. The spectrometer has an acceptance of 2.5-400 MeV (E(max)/E(min)>100) with a resolution of better than 1% rms for electron energies above 25 MeV. This high resolution is achieved by refocusing electrons in the energy plane and without any postprocessing image deconvolution. Finally, the spectrometer employs two complimentary detection mechanisms: (1) absolutely calibrated scintillation screens imaged by cameras outside the vacuum chamber and (2) an array of scintillating fibers coupled to a low-noise charge-coupled device. PMID:20687714

  5. A high resolution, broad energy acceptance spectrometer for laser wakefield acceleration experiments

    SciTech Connect

    Sears, Christopher M. S.; Cuevas, Sofia Benavides; Veisz, Laszlo; Schramm, Ulrich; Schmid, Karl; Buck, Alexander; Habs, Dieter; Krausz, Ferenc

    2010-07-15

    Laser wakefield experiments present a unique challenge in measuring the resulting electron energy properties due to the large energy range of interest, typically several 100 MeV, and the large electron beam divergence and pointing jitter >1 mrad. In many experiments the energy resolution and accuracy are limited by the convolved transverse spot size and pointing jitter of the beam. In this paper we present an electron energy spectrometer consisting of two magnets designed specifically for laser wakefield experiments. In the primary magnet the field is produced by permanent magnets. A second optional electromagnet can be used to obtain better resolution for electron energies above 75 MeV. The spectrometer has an acceptance of 2.5-400 MeV (E{sub max}/E{sub min}>100) with a resolution of better than 1% rms for electron energies above 25 MeV. This high resolution is achieved by refocusing electrons in the energy plane and without any postprocessing image deconvolution. Finally, the spectrometer employs two complimentary detection mechanisms: (1) absolutely calibrated scintillation screens imaged by cameras outside the vacuum chamber and (2) an array of scintillating fibers coupled to a low-noise charge-coupled device.

  6. 77 FR 24941 - Vantage Wind Energy LLC; Order Accepting Updated Market Power Analysis and Providing Direction on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... and August 8, 2011 filings were published in the Federal Register, 75 FR 81,600 (2010) and 77 FR 2518... Energy Regulatory Commission Vantage Wind Energy LLC; Order Accepting Updated Market Power Analysis and... analysis filed by Vantage Wind Energy LLC (Vantage Wind). As discussed below, the Commission concludes...

  7. Contested environmental policy infrastructure: Socio-political acceptance of renewable energy, water, and waste facilities

    SciTech Connect

    Wolsink, Maarten

    2010-09-15

    The construction of new infrastructure is hotly contested. This paper presents a comparative study on three environmental policy domains in the Netherlands that all deal with legitimising building and locating infrastructure facilities. Such infrastructure is usually declared essential to environmental policy and claimed to serve sustainability goals. They are considered to serve (proclaimed) public interests, while the adverse impact or risk that mainly concerns environmental values as well is concentrated at a smaller scale, for example in local communities. The social acceptance of environmental policy infrastructure is institutionally determined. The institutional capacity for learning in infrastructure decision-making processes in the following three domains is compared: 1.The implementation of wind power as a renewable energy innovation; 2.The policy on space-water adaptation, with its claim to implement a new style of management replacing the current practice of focusing on control and 'hard' infrastructure; 3.Waste policy with a focus on sound waste management and disposal, claiming a preference for waste minimization (the 'waste management hierarchy'). All three cases show a large variety of social acceptance issues, where the appraisal of the impact of siting the facilities is confronted with the desirability of the policies. In dealing with environmental conflict, the environmental capacity of the Netherlands appears to be low. The policies are frequently hotly contested within the process of infrastructure decision-making. Decision-making on infrastructure is often framed as if consensus about the objectives of environmental policies exists. These claims are not justified, and therefore stimulating the emergence of environmental conflicts that discourage social acceptance of the policies. Authorities are frequently involved in planning infrastructure that conflicts with their officially proclaimed policy objectives. In these circumstances, they are

  8. Large-acceptance linac for accelerating l9w-energy muons

    SciTech Connect

    Kurennoy, Sergey S; Jason, Andrew J; Miyadera, Haruo

    2010-01-01

    We propose a high-gradient linear accelerator for accelerating low-energy muons and pions in a strong solenoidal magnetic field. The acceleration starts immediately after collection of pions from a target by solenoidal magnets and brings muons to a kinetic energy of about 200 MeV over a distance of the order of 10 m. At this energy, both an ionization cooling of the muon beam and its further acceleration in a superconducting linac become feasible. The project presents unique challenges - a very large energy spread in a highly divergent beam, as well as pion and muon decays - requiring large longitudinal and transverse acceptances. One potential solution incorporates a normal-conducting linac consisting of independently fed O-mode RF cavities with wide apertures closed by thin metal windows or grids. The guiding magnetic field is provided by external superconducting solenoids. The cavity choice, overall linac design considerations, and simulation results of muon acceleration are presented. While the primary applications of such a linac are for homeland defense and industry, it can provide muon fluxes high enough to be of interest for physics experiments.

  9. 76 FR 9612 - GE Hitachi Nuclear Energy; Acceptance for Docketing of an Application for Renewal of the U.S...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION GE Hitachi Nuclear Energy; Acceptance for Docketing of an Application for Renewal of the U.S. Advanced Boiling Water Reactor Design Certification On December 7, 2010, GE Hitachi Nuclear Energy (GEH) submitted an application to the U.S....

  10. Nuclear energy acceptance and potential role to meet future energy demand. Which technical/scientific achievements are needed?

    NASA Astrophysics Data System (ADS)

    Schenkel, Roland

    2012-06-01

    25 years after Chernobyl, the Fukushima disaster has changed the perspectives of nuclear power. The disaster has shed a negative light on the independence, reliability and rigor of the national nuclear regulator and plant operator and the usefulness of the international IAEA guidelines on nuclear safety. It has become clear that, in the light of the most severe earthquake in the history of Japan, the plants at Fukushima Daiichi were not adequately protected against tsunamis. Nuclear acceptance has suffered enormously and has changed the perspectives of nuclear energy dramatically in countries that have a very risk-sensitive population, Germany is an example. The paper analyses the reactions in major countries and the expected impact on future deployment of reactors and on R&D activities. On the positive side, the disaster has demonstrated a remarkable robustness of most of the 14 reactors closest to the epicentre of the Tohoku Seaquake although not designed to an event of level 9.0. Public acceptance can only be regained with a rigorous and worldwide approach towards inherent reactor safety and design objectives that limit the impact of severe accidents to the plant itself (like many of the new Gen III reactors). A widespread release of radioactivity and the evacuation (temporary or permanent) of the population up to 30 km around a facility are simply not acceptable. Several countries have announced to request more stringent international standards for reactor safety. The IAEA should take this move forward and intensify and strengthen the different peer review mission schemes. The safety guidelines and peer reviews should in fact become legally binding for IAEA members. The paper gives examples of the new safety features developed over the last 20 years and which yield much safer reactors with lesser burden to the environment under severe accident conditions. The compatibility of these safety systems with the current concepts for fusion-fission hybrids, which have

  11. Nuclear energy acceptance and potential role to meet future energy demand. Which technical/scientific achievements are needed?

    SciTech Connect

    Schenkel, Roland

    2012-06-19

    25 years after Chernobyl, the Fukushima disaster has changed the perspectives of nuclear power. The disaster has shed a negative light on the independence, reliability and rigor of the national nuclear regulator and plant operator and the usefulness of the international IAEA guidelines on nuclear safety. It has become clear that, in the light of the most severe earthquake in the history of Japan, the plants at Fukushima Daiichi were not adequately protected against tsunamis. Nuclear acceptance has suffered enormously and has changed the perspectives of nuclear energy dramatically in countries that have a very risk-sensitive population, Germany is an example. The paper analyses the reactions in major countries and the expected impact on future deployment of reactors and on R and D activities. On the positive side, the disaster has demonstrated a remarkable robustness of most of the 14 reactors closest to the epicentre of the Tohoku Seaquake although not designed to an event of level 9.0. Public acceptance can only be regained with a rigorous and worldwide approach towards inherent reactor safety and design objectives that limit the impact of severe accidents to the plant itself (like many of the new Gen III reactors). A widespread release of radioactivity and the evacuation (temporary or permanent) of the population up to 30 km around a facility are simply not acceptable. Several countries have announced to request more stringent international standards for reactor safety. The IAEA should take this move forward and intensify and strengthen the different peer review mission schemes. The safety guidelines and peer reviews should in fact become legally binding for IAEA members. The paper gives examples of the new safety features developed over the last 20 years and which yield much safer reactors with lesser burden to the environment under severe accident conditions. The compatibility of these safety systems with the current concepts for fusion-fission hybrids, which

  12. 75 FR 9196 - Letter From Secretary of Energy Accepting Defense Nuclear Facilities Safety Board (Board...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... regarding seismic safety at the Los Alamos National Laboratory Plutonium Facility. ADDRESSES: U.S... Laboratory Plutonium Facility Seismic Safety, issued on October 26, 2009, and I accept the recommendation. In... new Documented Safety Analysis (DSA) for the Plutonium Facility at Los Alamos National...

  13. 76 FR 70720 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... the Federal Power Act, proposing to study the feasibility of the Avalon Tidal Energy Project, which... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  14. 77 FR 50101 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit... May 22, 2012, Natural Currents Energy Services, LLC filed an application, pursuant to section 4(f)...

  15. 77 FR 61598 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit... May 22, 2012, Natural Currents Energy Services, LLC filed an application, pursuant to section 4(f)...

  16. 77 FR 39693 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... the Federal Power Act, proposing to study the feasibility of the Fisher's Island Tidal Energy Project... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  17. 77 FR 60429 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... the Federal Power Act, proposing to study the feasibility of the Fisher's Island Tidal Energy Project... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  18. 77 FR 17474 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... the Federal Power Act, proposing to study the feasibility of the Orient Point Tidal Energy Project... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  19. 76 FR 37806 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit... March 29, 2011, and supplemented on May 31, 2011, Natural Currents Energy Services, LLC filed...

  20. 76 FR 67726 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... the Federal Power Act, proposing to study the feasibility of the Dorchester--Maurice Tidal Energy... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  1. 76 FR 76154 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... the Federal Power Act, proposing to study the feasibility of the Cape May Tidal Energy Project, which... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  2. 75 FR 70730 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... the Salem Tidal Energy Project, which would be located on the Salem River, in Salem County, New Jersey... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  3. 76 FR 76155 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... the Federal Power Act, proposing to study the feasibility of the Maurice River Tidal Energy Project... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  4. 77 FR 38622 - Whitewater Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Energy Regulatory Commission Whitewater Green Energy, LLC; Notice of Preliminary Permit Application..., 2012, Whitewater Green Energy, LLC, filed an application for a preliminary permit, pursuant to section... gigawatt-hours. Applicant Contact: Mr. David Harmon, Whitewater Green Energy, LLC, 601 7th Avenue, P.O....

  5. 78 FR 44557 - Turnagain Arm Tidal Energy Corporation; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ...-electrical energy generating units for a total installed capacity of 240 MW; (2) one control building... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Turnagain Arm Tidal Energy Corporation; Notice of Preliminary...

  6. Acceptance Studies for 4He(e,e'p)X Reaction up to High Missing Energies and Momenta

    NASA Astrophysics Data System (ADS)

    Finton, Drew; Benmokhtar, Fatiha

    2014-03-01

    Data collected from the Helium-4 target in Hall A at Thomas Jefferson National Accelerator Facility (TJNAF) in Newport News, Virginia, was analyzed using the object-oriented data analysis software ROOT and used to create Missing Energy Spectra for Missing Momenta ranging from 150 MeV/c to 755 MeV/c for 4He(e,e'p)X reaction channels. Jefferson Lab is a continuous electron beam accelerator facility, and Hall A contains two high resolution spectrometers as well as the cryogenic Helium-4 target. Acceptance cuts were made to six measured variables to remove background noise, and then applied to produce a Missing Energy Spectrum showing two- and three-body break up channels as well as pion electro-production energy threshold. The analysis of these missing energy spectra will be used to understand the contributions of one-, two-, and three-body interactions.

  7. 77 FR 70433 - Resolute Marine Energy, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... Alaska Wave Energy Project No. 14438. Resolute supplemented its application on September 19, 2012. The...) Between 7 and 15 Surge Wave Energy Converters for a maximum total installed capacity of 750 kilowatts;...

  8. 75 FR 61479 - Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... Energy Regulatory Commission Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application..., pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Kendall Head... estimated annual generation of the Kendall Head Tidal Energy Project would be 3.12 to 3.96...

  9. 75 FR 30388 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... the Highlands New Jersey Tidal Energy Project, which would be located on the Shrewsbury River, in... Currents Red Hawk \\TM\\ Tidal In-Stream Energy Conversion (TISEC) modules would generate electricity in the... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY...

  10. 75 FR 7469 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ..., proposing to study the feasibility of the Icy Passage Tidal Energy Project, located in Icy Passage, in the... generating capacity of 300 kW; (3) one or more clusters of Tidal In-Stream Energy Conversion Devices (TISEC... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY...

  11. 75 FR 7467 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... the Federal Power Act, proposing to study the feasibility of the Gastineau Channel Tidal Energy... total generating capacity of 300 kW; (3) one or more clusters of Tidal In-Stream Energy Conversion... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY...

  12. 75 FR 30388 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... the Hoffmans Marina Tidal Energy Project, which would be located on the Manasquan River, in Monmouth... and marina on site. Natural Currents Red Hawk \\TM\\ Tidal In-Stream Energy Conversion (TISEC) modules... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY...

  13. Environmentally-acceptable fossil energy site evaluation and selection: methodology and user's guide. Volume 1

    SciTech Connect

    Northrop, G.M.

    1980-02-01

    This report is designed to facilitate assessments of environmental and socioeconomic impacts of fossil energy conversion facilities which might be implemented at potential sites. The discussion of methodology and the User's Guide contained herein are presented in a format that assumes the reader is not an energy technologist. Indeed, this methodology is meant for application by almost anyone with an interest in a potential fossil energy development - planners, citizen groups, government officials, and members of industry. It may also be of instructional value. The methodology is called: Site Evaluation for Energy Conversion Systems (SELECS) and is organized in three levels of increasing sophistication. Only the least complicated version - the Level 1 SELECS - is presented in this document. As stated above, it has been expressly designed to enable just about anyone to participate in evaluating the potential impacts of a proposed energy conversion facility. To accomplish this objective, the Level 1 calculations have been restricted to ones which can be performed by hand in about one working day. Data collection and report preparation may bring the total effort required for a first or one-time application to two to three weeks. If repeated applications are made in the same general region, the assembling of data for a different site or energy conversion technology will probably take much less time.

  14. Study of the impacts of regulations affecting the acceptance of integrated community energy systems. Final report

    SciTech Connect

    Feurer, Duane A.; Weaver, Clifford L.; Rielley, Kevin J.; Gallagher, Kevin C.; Harmon, Susan B.; Hejna, David T.; Kitch, Edmund W.

    1981-01-01

    A detailed description is presented of the laws and programs of the State of North Carolina governing the regulation of public energy utilities, the siting of energy generating and transmission facilities, the municipal franchising of public energy utilities, and the prescription of rates to be charged by utilities including attendant problems of cost allocations, rate base and operating expense determinations, and rate of return allowances. These laws and programs are analyzed to identify impediments which they may present to the implementation of Integrated Community Energy Systems (ICES). This report is one of fifty-one separate volumes which describe such regulatory programs at the Federal level and in each state as background to the report entitled Community Energy Systems and the Law of Public Utilities - Volume One: An Overview. This report also contains a summary of a strategy described in Volume One - An Overview for overcoming these impediments by working within the existing regulatory framework and by making changes in the regulatory programs to enhance the likelihood of ICES implementation.

  15. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  16. Social Acceptance of Wind Energy: Managing and Evaluating Its Market Impacts (Presentation)

    SciTech Connect

    Baring-Gould, I.

    2012-06-01

    As with any industrial-scale technology, wind power has impacts. As wind technology deployment becomes more widespread, a defined opposition will form as a result of fear of change and competing energy technologies. As the easy-to-deploy sites are developed, the costs of developing at sites with deployment barriers will increase, therefore increasing the total cost of power. This presentation provides an overview of wind development stakeholders and related stakeholder engagement questions, Energy Department activities that provide wind project deployment information, and the quantification of deployment barriers and costs in the continental United States.

  17. Initial assessment of public perception and acceptance of Geothermal Energy applications in Çanakkale, NW Turkey.

    NASA Astrophysics Data System (ADS)

    Sedat Çetiner, Ziya; Çekiç, Osman; Ertekin, Can; Bakırcı, Mesut

    2016-04-01

    Growing need of energy in global scale has resulted in increasing number of research and development of renewable energy technologies. Turkey, being very rich in the renewable energy resources, has recently paid special attention to accelerate utilization of these resources to reduce the carbon based energy cost. Among these, Geothermal Energy resources in the country, mainly utilized in district heating and balneological applications, has been shifted toward harvesting electric energy in the shed of recent incentives. While these developments are happening at the policy level, the knowledge and the perception of the public is important to shape the future policies and acceptance of such resources in daily life. In light of these developments, the aim of this study is to identify and analyze the public awareness and acceptance mechanisms for the successful deployment of future and ongoing geothermal investments in Çanakkale region of the Biga Peninsula using geological, social and economic constraints in a well-defined questionnaire. The study employed a mixed method to explore the public perception. Mixed method studies involve qualitative and quantitative techniques and intends to explore an issue in-depth. Thus a sequential explanatory design was used to gather the public's perception. Exploratory design involves a qualitative study followed by a design of a quantitative survey and analysis. The researchers, firs, interviewed 24 college students about their knowledge and perceptions of geothermal resources using a semi-structured interview protocol. The protocol comprised of 8 open ended questions. With the help of the literature and the qualitative survey results, an item database with 51 questions were constructed. The initial survey and the items then were sent to 5 experts. Following the expert review, the survey was given its final form and the item numbers were dropped to 34. Then this survey was applied to a group of 100 college students. The survey also

  18. ATLAS ACCEPTANCE TEST

    SciTech Connect

    J.C. COCHRANE; J.V. PARKER; ET AL

    2001-06-01

    The acceptance test program for Atlas, a 23 MJ pulsed power facility for use in the Los Alamos High Energy Density Hydrodynamics program, has been completed. Completion of this program officially releases Atlas from the construction phase and readies it for experiments. Details of the acceptance test program results and of machine capabilities for experiments will be presented.

  19. Filtering Chromatic Aberration for Wide Acceptance Angle Electrostatic Lenses II--Experimental Evaluation and Software-Based Imaging Energy Analyzer.

    PubMed

    Fazekas, Ádám; Daimon, Hiroshi; Matsuda, Hiroyuki; Tóth, László

    2016-03-01

    Here, the experimental results of the method of filtering the effect of chromatic aberration for wide acceptance angle electrostatic lens-based system are described. This method can eliminate the effect of chromatic aberration from the images of a measured spectral image sequence by determining and removing the effect of higher and lower kinetic energy electrons on each different energy image, which leads to significant improvement of image and spectral quality. The method is based on the numerical solution of a large system of linear equations and equivalent with a multivariate strongly nonlinear deconvolution method. A matrix whose elements describe the strongly nonlinear chromatic aberration-related transmission function of the lens system acts on the vector of the ordered pixels of the distortion free spectral image sequence, and produces the vector of the ordered pixels of the measured spectral image sequence. Since the method can be applied not only on 2D real- and $k$ -space diffraction images, but also along a third dimension of the image sequence that is along the optical or in the 3D parameter space, the energy axis, it functions as a software-based imaging energy analyzer (SBIEA). It can also be applied in cases of light or other type of optics for different optical aberrations and distortions. In case of electron optics, the SBIEA method makes possible the spectral imaging without the application of any other energy filter. It is notable that this method also eliminates the disturbing background significantly in the present investigated case of reflection electron energy loss spectra. It eliminates the instrumental effects and makes possible to measure the real physical processes better. PMID:26863662

  20. Public Health, the APHA, and Urban Renewal

    PubMed Central

    2009-01-01

    Joint efforts by fields of public health in the last decade have advocated use of the built environment to protect health. Past involvement by public health advocates in urban policy, however, has had mixed results. Although public health has significantly contributed to health improvements, its participation in urban renewal activities was problematic. Health advocates and the American Public Health Association produced guidelines that were widely used to declare inner-city areas blighted and provided a scientific justification for demolishing neighborhoods and displacing mostly poor and minority people. Furthermore, health departments failed to uphold their legal responsibility to ensure that relocated families received safe, affordable housing alternatives. These failures have important implications for future health-related work on the built environment and other core public health activities. PMID:19608955

  1. Acceptance speech.

    PubMed

    Carpenter, M

    1994-01-01

    In Bangladesh, the assistant administrator of USAID gave an acceptance speech at an awards ceremony on the occasion of the 25th anniversary of oral rehydration solution (ORS). The ceremony celebrated the key role of the International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B) in the discovery of ORS. Its research activities over the last 25 years have brought ORS to every village in the world, preventing more than a million deaths each year. ORS is the most important medical advance of the 20th century. It is affordable and client-oriented, a true appropriate technology. USAID has provided more than US$ 40 million to ICDDR,B for diarrheal disease and measles research, urban and rural applied family planning and maternal and child health research, and vaccine development. ICDDR,B began as the relatively small Cholera Research Laboratory and has grown into an acclaimed international center for health, family planning, and population research. It leads the world in diarrheal disease research. ICDDR,B is the leading center for applied health research in South Asia. It trains public health specialists from around the world. The government of Bangladesh and the international donor community have actively joined in support of ICDDR,B. The government applies the results of ICDDR,B research to its programs to improve the health and well-being of Bangladeshis. ICDDR,B now also studies acute respiratory diseases and measles. Population and health comprise 1 of USAID's 4 strategic priorities, the others being economic growth, environment, and democracy, USAID promotes people's participation in these 4 areas and in the design and implementation of development projects. USAID is committed to the use and improvement of ORS and to complementary strategies that further reduce diarrhea-related deaths. Continued collaboration with a strong user perspective and integrated services will lead to sustainable development. PMID:12345470

  2. Acceptance speech.

    PubMed

    Yusuf, C K

    1994-01-01

    I am proud and honored to accept this award on behalf of the Government of Bangladesh, and the millions of Bangladeshi children saved by oral rehydration solution. The Government of Bangladesh is grateful for this recognition of its commitment to international health and population research and cost-effective health care for all. The Government of Bangladesh has already made remarkable strides forward in the health and population sector, and this was recognized in UNICEF's 1993 "State of the World's Children". The national contraceptive prevalence rate, at 40%, is higher than that of many developed countries. It is appropriate that Bangladesh, where ORS was discovered, has the largest ORS production capacity in the world. It was remarkable that after the devastating cyclone in 1991, the country was able to produce enough ORS to meet the needs and remain self-sufficient. Similarly, Bangladesh has one of the most effective, flexible and efficient control of diarrheal disease and epidemic response program in the world. Through the country, doctors have been trained in diarrheal disease management, and stores of ORS are maintained ready for any outbreak. Despite grim predictions after the 1991 cyclone and the 1993 floods, relatively few people died from diarrheal disease. This is indicative of the strength of the national program. I want to take this opportunity to acknowledge the contribution of ICDDR, B and the important role it plays in supporting the Government's efforts in the health and population sector. The partnership between the Government of Bangladesh and ICDDR, B has already borne great fruit, and I hope and believe that it will continue to do so for many years in the future. Thank you. PMID:12345479

  3. 78 FR 19698 - Lucid Energy, Inc., The City of Portland Water Bureau; Notice of Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... Energy Regulatory Commission Lucid Energy, Inc., The City of Portland Water Bureau; Notice of Application.... Date filed: February 13, 2013. d. Applicant: Lucid Energy, Inc., The City of Portland Water Bureau. e.... Applicant Contact: Ms. Jan Lee, Water & Energy Resource Services P.O. Box 2517, Clackamas, OR 97105, Cell...

  4. 75 FR 47586 - New York Tidal Energy Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Energy Regulatory Commission New York Tidal Energy Company; Notice of Preliminary Permit Application.... On May 12, 2010, New York Tidal Energy Company filed an application for a preliminary permit.... The proposed project would consist of the following: (1) 50 to 150 Tidal In Stream Energy...

  5. 75 FR 47586 - New York Tidal Energy Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Energy Regulatory Commission New York Tidal Energy Company; Notice of Preliminary Permit Application.... On May 12, 2010, New York Tidal Energy Company filed an application for a preliminary permit... Tidal Energy Pilot Project, located on the East River, in New York City, New York. The sole purpose of...

  6. 77 FR 24195 - Green River Energy BFD, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... Energy Regulatory Commission Green River Energy BFD, LLC; Notice of Preliminary Permit Application..., 2012, Green River Energy BFD, LLC filed an application for a preliminary permit, pursuant to section 4... located at the U.S. Army Corps of Engineers' (Corps) Green River Lake Dam, located on the Green River...

  7. 75 FR 21289 - Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Energy Regulatory Commission Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit Application..., 2010. On March 2, 2010, Oregon Wave Energy Partners I, LLC filed an application for a subsequent... the Coos Bay OPT Wave Park Project. The requested project boundary comprises approximately 7.36...

  8. Assessment of wear and periacetabular osteolysis using dual energy computed tomography on a pig cadaver to identify the lowest acceptable radiation dose

    PubMed Central

    Skorpil, M.; Nowik, P.; Olivecrona, H.; Crafoord, J.; Weidenhielm, L.; Persson, A.

    2016-01-01

    Objectives Computed tomography (CT) plays an important role in evaluating wear and periacetabular osteolysis (PAO) in total hip replacements. One concern with CT is the high radiation exposure since standard pelvic CT provides approximately 3.5 millisieverts (mSv) of radiation exposure, whereas a planar radiographic examination with three projections totals approximately 0.5 mSv. The objective of this study was to evaluate the lowest acceptable radiation dose for dual-energy CT (DECT) images when measuring wear and periacetabular osteolysis in uncemented metal components. Materials and Methods A porcine pelvis with bilateral uncemented hip prostheses and with known linear wear and acetabular bone defects was examined in a third-generation multidetector DECT scanner. The examinations were performed with four different radiation levels both with and without iterative reconstruction techniques. From the high and low peak kilo voltage acquisitions, polychrmoatic images were created together with virtual monochromatic images of energies 100 kiloelectron volts (keV) and 150 keV. Results We could assess wear and PAO while substantially lowering the effective radiation dose to 0.7 mSv for a total pelvic view with an accuracy of around 0.5 mm for linear wear and 2 mm to 3 mm for PAO. Conclusion CT for detection of prosthetic wear and PAO could be used with clinically acceptable accuracy at a radiation exposure level equal to plain radiographic exposures. Cite this article: B. Sandgren, M. Skorpil, P. Nowik, H. Olivecrona, J. Crafoord, L. Weidenhielm, A. Persson. Assessment of wear and periacetabular osteolysis using dual energy computed tomography on a pig cadaver to identify the lowest acceptable radiation dose. Bone Joint Res 2016;5:307–313. DOI: 10.1302/2046-3758.57.2000566. PMID:27445358

  9. Criteria for the development and use of the methodology for environmentally-acceptable fossil energy site evaluation and selection. Volume 2. Final report

    SciTech Connect

    Eckstein, L.; Northrop, G.; Scott, R.

    1980-02-01

    This report serves as a companion document to the report, Volume 1: Environmentally-Acceptable Fossil Energy Site Evaluation and Selection: Methodology and Users Guide, in which a methodology was developed which allows the siting of fossil fuel conversion facilities in areas with the least environmental impact. The methodology, known as SELECS (Site Evaluation for Energy Conversion Systems) does not replace a site specific environmental assessment, or an environmental impact statement (EIS), but does enhance the value of an EIS by thinning down the number of options to a manageable level, by doing this in an objective, open and selective manner, and by providing preliminary assessment and procedures which can be utilized during the research and writing of the actual impact statement.

  10. 76 FR 35212 - Northern States Power Company (Xcel Energy); Notice of Application To Amend License and Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    .... Zawacki, Director of Hydro Plants, Xcel Energy, 1414 W. Hamilton Ave., P.O. Box 8, Eau Claire, WI 54702..., Eau Claire, WI 54702-0008. i. FERC Contact: Kim Carter at (202) 502-6486; Kim.Carter@ferc.gov ....

  11. Inventory of Safety-related Codes and Standards for Energy Storage Systems with some Experiences related to Approval and Acceptance

    SciTech Connect

    Conover, David R.

    2014-09-11

    The purpose of this document is to identify laws, rules, model codes, codes, standards, regulations, specifications (CSR) related to safety that could apply to stationary energy storage systems (ESS) and experiences to date securing approval of ESS in relation to CSR. This information is intended to assist in securing approval of ESS under current CSR and to identification of new CRS or revisions to existing CRS and necessary supporting research and documentation that can foster the deployment of safe ESS.

  12. High acceptance recoil polarimeter

    SciTech Connect

    The HARP Collaboration

    1992-12-05

    In order to detect neutrons and protons in the 50 to 600 MeV energy range and measure their polarization, an efficient, low-noise, self-calibrating device is being designed. This detector, known as the High Acceptance Recoil Polarimeter (HARP), is based on the recoil principle of proton detection from np[r arrow]n[prime]p[prime] or pp[r arrow]p[prime]p[prime] scattering (detected particles are underlined) which intrinsically yields polarization information on the incoming particle. HARP will be commissioned to carry out experiments in 1994.

  13. 10 CFR 1050.202 - Allowable acceptance of gifts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Allowable acceptance of gifts. 1050.202 Section 1050.202 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) FOREIGN GIFTS AND DECORATIONS Guidelines for Acceptance of Foreign Gifts or Decorations § 1050.202 Allowable acceptance of gifts. (a) An employee may accept and retain gifts from foreign...

  14. Conception et validation d'un modele d'analyse et de suivi pour une politique energetique durable et acceptable de l'energie eolienne: Une etude comparative France-Quebec

    NASA Astrophysics Data System (ADS)

    Feurtey, Evariste

    In this research, we built a conceptual model of a sustainable and acceptable wind power policy that we tried to validate through the case study of France and Quebec in the wind energy sector. Our qualitative and comparative approach helps us to illustrate the interaction of institutional variables studied, including the national context of emergence, the balance of power between pressure groups, the supranational and exogenous influences, level of political commitment, policy and regulatory instruments, social acceptance and energy policy mechanisms. The research confirms that the neo-corporatism is present in France as in Quebec. With the unfavorable energy context (low cost of electricity tariff, lack of electricity demand, and an already low zero carbon electric mix), it is an important factor explaining : 1) the 20 years delay accumulated by France and Quebec in the development of wind projects or industrial sector; 2) the 10% limited penetration scale given to wind energy. We also demonstrate that the political commitment to develop wind energy fluctuates with the government majority, the energy context or the influence of pressure groups. This manifests itself in a lack of continuity of policies and tariff instruments used. In both national case studies, the results also show that balanced policies and regulations ensure sustainable development of wind energy only if they allow a sufficient market size. The search results also illustrates that the conceptual division made between acceptance of wind sector, acceptance of ownership, local acceptance is very instructive. Social controversies, though multifactorial, are connected to both a critique of the development model too industrial and private, territorial dilemmas (closed environment), energy context (electric surplus in Quebec), or related to strategic planning system and centralized decision. An important issue for a more acceptable wind policy in the future will come to a greater plurality of ownership

  15. The MAGNEX large acceptance spectrometer

    SciTech Connect

    Cavallaro, M.; Cappuzzello, F.; Cunsolo, A.; Carbone, D.; Foti, A.

    2010-03-01

    The main features of the MAGNEX large acceptance magnetic spectrometer are described. It has a quadrupole + dipole layout and a hybrid detector located at the focal plane. The aberrations due to the large angular (50 msr) and momentum (+- 13%) acceptance are reduced by an accurate hardware design and then compensated by an innovative software ray-reconstruction technique. The obtained resolution in energy, angle and mass are presented in the paper. MAGNEX has been used up to now for different experiments in nuclear physics and astrophysics confirming to be a multipurpose device.

  16. 10 CFR 1050.203 - Acceptance of decorations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Acceptance of decorations. 1050.203 Section 1050.203 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) FOREIGN GIFTS AND DECORATIONS Guidelines for Acceptance of Foreign Gifts or Decorations § 1050.203 Acceptance of decorations. (a) An employee may...

  17. Social Acceptance of Wind: A Brief Overview (Presentation)

    SciTech Connect

    Lantz, E.

    2015-01-01

    This presentation discusses concepts and trends in social acceptance of wind energy, profiles recent research findings, and discussions mitigation strategies intended to resolve wind power social acceptance challenges as informed by published research and the experiences of individuals participating in the International Energy Agencies Working Group on Social Acceptance of Wind Energy

  18. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  19. Modeling asbestosis mortality risk using alternative exposure metrics [APHA 2015

    EPA Science Inventory

    Background: In Libby, MT, the mining of asbestos-contaminated vermiculite ore exposed workers and residents to asbestos fibers. The mine closed in 1990. Libby vermiculite was used in attic insulation and as a soil conditioner. USEPA recently completed its Toxicological Review of ...

  20. Acceptance, values, and probability.

    PubMed

    Steel, Daniel

    2015-10-01

    This essay makes a case for regarding personal probabilities used in Bayesian analyses of confirmation as objects of acceptance and rejection. That in turn entails that personal probabilities are subject to the argument from inductive risk, which aims to show non-epistemic values can legitimately influence scientific decisions about which hypotheses to accept. In a Bayesian context, the argument from inductive risk suggests that value judgments can influence decisions about which probability models to accept for likelihoods and priors. As a consequence, if the argument from inductive risk is sound, then non-epistemic values can affect not only the level of evidence deemed necessary to accept a hypothesis but also degrees of confirmation themselves. PMID:26386533

  1. Newbery Medal Acceptance.

    ERIC Educational Resources Information Center

    Freedman, Russell

    1988-01-01

    Presents the Newbery Medal acceptance speech of Russell Freedman, writer of children's nonfiction. Discusses the place of nonfiction in the world of children's literature, the evolution of children's biographies, and the author's work on "Lincoln." (ARH)

  2. Newbery Medal Acceptance.

    ERIC Educational Resources Information Center

    Cleary, Beverly

    1984-01-01

    Reprints the text of Ms. Cleary's Newbery medal acceptance speech in which she gives personal history concerning her development as a writer and her response to the letters she receives from children. (CRH)

  3. Caldecott Medal Acceptance.

    ERIC Educational Resources Information Center

    Provensen, Alice; Provensen, Martin

    1984-01-01

    Reprints the text of the Provensens' Caldecott medal acceptance speech in which they describe their early interest in libraries and literature, the collaborative aspect of their work, and their current interest in aviation. (CRH)

  4. Accept or divert?

    PubMed

    Angelucci, P A

    1999-09-01

    Stretching scarce resources is more than a managerial issue. Should you accept the patient to an understaffed ICU or divert him to another facility? The intense "medical utility" controversy focuses on a situation that critical care nurses now face every day. PMID:10614370

  5. Approaches to acceptable risk

    SciTech Connect

    Whipple, C.

    1997-04-30

    Several alternative approaches to address the question {open_quotes}How safe is safe enough?{close_quotes} are reviewed and an attempt is made to apply the reasoning behind these approaches to the issue of acceptability of radiation exposures received in space. The approaches to the issue of the acceptability of technological risk described here are primarily analytical, and are drawn from examples in the management of environmental health risks. These include risk-based approaches, in which specific quantitative risk targets determine the acceptability of an activity, and cost-benefit and decision analysis, which generally focus on the estimation and evaluation of risks, benefits and costs, in a framework that balances these factors against each other. These analytical methods tend by their quantitative nature to emphasize the magnitude of risks, costs and alternatives, and to downplay other factors, especially those that are not easily expressed in quantitative terms, that affect acceptance or rejection of risk. Such other factors include the issues of risk perceptions and how and by whom risk decisions are made.

  6. 1984 Newbery Acceptance Speech.

    ERIC Educational Resources Information Center

    Cleary, Beverly

    1984-01-01

    This acceptance speech for an award honoring "Dear Mr. Henshaw," a book about feelings of a lonely child of divorce intended for eight-, nine-, and ten-year-olds, highlights children's letters to author. Changes in society that affect children, the inception of "Dear Mr. Henshaw," and children's reactions to books are highlighted. (EJS)

  7. Why was Relativity Accepted?

    NASA Astrophysics Data System (ADS)

    Brush, S. G.

    Historians of science have published many studies of the reception of Einstein's special and general theories of relativity. Based on a review of these studies, and my own research on the role of the light-bending prediction in the reception of general relativity, I discuss the role of three kinds of reasons for accepting relativity (1) empirical predictions and explanations; (2) social-psychological factors; and (3) aesthetic-mathematical factors. According to the historical studies, acceptance was a three-stage process. First, a few leading scientists adopted the special theory for aesthetic-mathematical reasons. In the second stage, their enthusiastic advocacy persuaded other scientists to work on the theory and apply it to problems currently of interest in atomic physics. The special theory was accepted by many German physicists by 1910 and had begun to attract some interest in other countries. In the third stage, the confirmation of Einstein's light-bending prediction attracted much public attention and forced all physicists to take the general theory of relativity seriously. In addition to light-bending, the explanation of the advance of Mercury's perihelion was considered strong evidence by theoretical physicists. The American astronomers who conducted successful tests of general relativity became defenders of the theory. There is little evidence that relativity was `socially constructed' but its initial acceptance was facilitated by the prestige and resources of its advocates.

  8. UGV acceptance testing

    NASA Astrophysics Data System (ADS)

    Kramer, Jeffrey A.; Murphy, Robin R.

    2006-05-01

    With over 100 models of unmanned vehicles now available for military and civilian safety, security or rescue applications, it is important to for agencies to establish acceptance testing. However, there appears to be no general guidelines for what constitutes a reasonable acceptance test. This paper describes i) a preliminary method for acceptance testing by a customer of the mechanical and electrical components of an unmanned ground vehicle system, ii) how it has been applied to a man-packable micro-robot, and iii) discusses the value of testing both to ensure that the customer has a workable system and to improve design. The test method automated the operation of the robot to repeatedly exercise all aspects and combinations of components on the robot for 6 hours. The acceptance testing process uncovered many failures consistent with those shown to occur in the field, showing that testing by the user does predict failures. The process also demonstrated that the testing by the manufacturer can provide important design data that can be used to identify, diagnose, and prevent long-term problems. Also, the structured testing environment showed that sensor systems can be used to predict errors and changes in performance, as well as uncovering unmodeled behavior in subsystems.

  9. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-07-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

  10. 10 CFR 603.550 - Acceptability of intellectual property.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Acceptability of intellectual property. 603.550 Section 603.550 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Cost Sharing § 603.550 Acceptability of intellectual property. (a) In most instances, the contracting officer...

  11. Acceptability of human risk.

    PubMed Central

    Kasperson, R E

    1983-01-01

    This paper has three objectives: to explore the nature of the problem implicit in the term "risk acceptability," to examine the possible contributions of scientific information to risk standard-setting, and to argue that societal response is best guided by considerations of process rather than formal methods of analysis. Most technological risks are not accepted but are imposed. There is also little reason to expect consensus among individuals on their tolerance of risk. Moreover, debates about risk levels are often at base debates over the adequacy of the institutions which manage the risks. Scientific information can contribute three broad types of analyses to risk-setting deliberations: contextual analysis, equity assessment, and public preference analysis. More effective risk-setting decisions will involve attention to the process used, particularly in regard to the requirements of procedural justice and democratic responsibility. PMID:6418541

  12. Age and Acceptance of Euthanasia.

    ERIC Educational Resources Information Center

    Ward, Russell A.

    1980-01-01

    Study explores relationship between age (and sex and race) and acceptance of euthanasia. Women and non-Whites were less accepting because of religiosity. Among older people less acceptance was attributable to their lesser education and greater religiosity. Results suggest that quality of life in old age affects acceptability of euthanasia. (Author)

  13. THE ENVIRONMENTAL TECHNOLOGIES ACCEPTANCE (ETA) PROGRAM

    SciTech Connect

    Christina B. Behr-Andres

    2001-04-01

    The Environmental Technologies Acceptance (ETA) Program at the Energy and Environmental Research Center (EERC) is intended to advance the development, commercial acceptance, and timely deployment of selected private sector technologies for the cleanup of sites in the nuclear defense complex as well as the greater market. As shown in Table 1, this cooperative agreement funded by the National Energy Technology Laboratory (NETL) consists of three tasks: Technology Selection, Technology Development, and Technology Verification. As currently conceived, the ETA will address the needs of as many technologies as appropriate under its current 3-year term. This report covers activities during the first 6 months of the 3-year ETA program.

  14. Baby-Crying Acceptance

    NASA Astrophysics Data System (ADS)

    Martins, Tiago; de Magalhães, Sérgio Tenreiro

    The baby's crying is his most important mean of communication. The crying monitoring performed by devices that have been developed doesn't ensure the complete safety of the child. It is necessary to join, to these technological resources, means of communicating the results to the responsible, which would involve the digital processing of information available from crying. The survey carried out, enabled to understand the level of adoption, in the continental territory of Portugal, of a technology that will be able to do such a digital processing. It was used the TAM as the theoretical referential. The statistical analysis showed that there is a good probability of acceptance of such a system.

  15. 10 CFR 2.815 - Docketing and acceptance review.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Docketing and acceptance review. 2.815 Section 2.815 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Rulemaking § 2.815 Docketing and acceptance review. (a) Each application for a standard...

  16. FBC: Gaining acceptance. [Fluidized Bed Combustion

    SciTech Connect

    Gawlicki, S.M.

    1991-04-01

    This article addresses the growing acceptance of fluidized bed combustion as a technology appropriate for use in dual-purpose power plants. The article reviews projects for cogeneration in California, a demonstration plant sponsored by the US Department of Energy in Ohio (this plant also incorporates combined cycle operation), and an electric power/greenhouse project in Pennsylvania.

  17. 10 CFR 1050.202 - Allowable acceptance of gifts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-related international organizations (e.g., the Nuclear Energy Agency and the International Energy Agency... 10 Energy 4 2012-01-01 2012-01-01 false Allowable acceptance of gifts. 1050.202 Section 1050.202 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) FOREIGN GIFTS AND DECORATIONS Guidelines for...

  18. 10 CFR 1050.202 - Allowable acceptance of gifts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-related international organizations (e.g., the Nuclear Energy Agency and the International Energy Agency... 10 Energy 4 2014-01-01 2014-01-01 false Allowable acceptance of gifts. 1050.202 Section 1050.202 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) FOREIGN GIFTS AND DECORATIONS Guidelines for...

  19. 10 CFR 1050.202 - Allowable acceptance of gifts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-related international organizations (e.g., the Nuclear Energy Agency and the International Energy Agency... 10 Energy 4 2011-01-01 2011-01-01 false Allowable acceptance of gifts. 1050.202 Section 1050.202 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) FOREIGN GIFTS AND DECORATIONS Guidelines for...

  20. Sonic boom acceptability studies

    NASA Astrophysics Data System (ADS)

    Shepherd, Kevin P.; Sullivan, Brenda M.; Leatherwood, Jack D.; McCurdy, David A.

    1992-04-01

    The determination of the magnitude of sonic boom exposure which would be acceptable to the general population requires, as a starting point, a method to assess and compare individual sonic booms. There is no consensus within the scientific and regulatory communities regarding an appropriate sonic boom assessment metric. Loudness, being a fundamental and well-understood attribute of human hearing was chosen as a means of comparing sonic booms of differing shapes and amplitudes. The figure illustrates the basic steps which yield a calculated value of loudness. Based upon the aircraft configuration and its operating conditions, the sonic boom pressure signature which reaches the ground is calculated. This pressure-time history is transformed to the frequency domain and converted into a one-third octave band spectrum. The essence of the loudness method is to account for the frequency response and integration characteristics of the auditory system. The result of the calculation procedure is a numerical description (perceived level, dB) which represents the loudness of the sonic boom waveform.

  1. Sonic boom acceptability studies

    NASA Technical Reports Server (NTRS)

    Shepherd, Kevin P.; Sullivan, Brenda M.; Leatherwood, Jack D.; Mccurdy, David A.

    1992-01-01

    The determination of the magnitude of sonic boom exposure which would be acceptable to the general population requires, as a starting point, a method to assess and compare individual sonic booms. There is no consensus within the scientific and regulatory communities regarding an appropriate sonic boom assessment metric. Loudness, being a fundamental and well-understood attribute of human hearing was chosen as a means of comparing sonic booms of differing shapes and amplitudes. The figure illustrates the basic steps which yield a calculated value of loudness. Based upon the aircraft configuration and its operating conditions, the sonic boom pressure signature which reaches the ground is calculated. This pressure-time history is transformed to the frequency domain and converted into a one-third octave band spectrum. The essence of the loudness method is to account for the frequency response and integration characteristics of the auditory system. The result of the calculation procedure is a numerical description (perceived level, dB) which represents the loudness of the sonic boom waveform.

  2. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  3. W-026, acceptance test report gamma energy assay (GEA) system A(submittal {number_sign}39.8) C3

    SciTech Connect

    Watson, T. L.

    1997-01-28

    This test procedure is designed to test all of the functions of the GEA system at the WRAP facility at Hanford, Washington. The procedure is designed to be executed in the sequence given, starting with: * verification of components and labeling * verification or entry of all of the setup parameters * performing the calibrations (energy, efficiency, transmission, and reference peak) * performing the measurements in local mode * performing the measurements in remote mode * confirming the message formats * utility operations (LN2 fill, archiving, password maintenance) The system is designed to be operated in a remote mode in which all commands are received over a network, and the results are returned over the same network. A manual mode is provided for the setup and calibration operations, and for maintenance functions. The system is designed to start up in remote mode. The user can go to local mode when at the keyboard by selecting Exit on the screen shown during remote mode. A user logon screen, requiring 2 username and password, limits access to local mode.

  4. A novel ionic liquid-in-oil microemulsion composed of biologically acceptable components: an excitation wavelength dependent fluorescence resonance energy transfer study.

    PubMed

    Mandal, Sarthak; Ghosh, Surajit; Banerjee, Chiranjib; Kuchlyan, Jagannath; Banik, Debasis; Sarkar, Nilmoni

    2013-03-21

    In this work we have reported the formulation of a novel ionic liquid-in-oil (IL/O) microemulsion where the polar core of the ionic liquid, 1-ethyl-3-methylimidazolium n-butylsulfate ([C2mim][C4SO4]), is stabilized by a mixture of two nontoxic nonionic surfactants, polyoxyethylene sorbitan monooleate (Tween-80) and sorbitan laurate (Span-20), in a biological oil phase of isopropyl myristate (IPM). The formation of the microemulsion droplets has been confirmed from the dynamic light scattering (DLS) and phase behavior study. To assess the dynamic heterogeneity of this tween-based IL/O microemulsion, we have performed an excitation wavelength dependent fluorescence resonance energy transfer (FRET) from coumarin 480 (C480) to rhodamine 6G (R6G). The multiple donor-acceptor (D-A) distances, ∼15, 30, and 45 Å, obtained from the rise times of the acceptor emission in the presence of a donor can be rationalized from the varying distribution of the donor, C480, in the different regions of the microemulsion system. With increasing the excitation wavelength from 375 to 408 nm, the contribution of the rise component of ∼240 ps which results the D-A distance of ∼30 Å increases significantly due to the enhanced contribution of the C480 probe molecules closer to the acceptor in the ionic liquid pool of the microemulsion. PMID:23445434

  5. Nevada Test Site Waste Acceptance Criteria, December 2000

    SciTech Connect

    2000-12-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal.

  6. Accepters and Rejecters of Counseling.

    ERIC Educational Resources Information Center

    Rose, Harriett A.; Elton, Charles F.

    Personality differences between students who accept or reject proffered counseling assistance were investigated by comparing personality traits of 116 male students at the University of Kentucky who accepted or rejected letters of invitation to group counseling. Factor analysis of Omnibus Personality Inventory (OPI) scores to two groups of 60 and…

  7. Cone penetrometer acceptance test report

    SciTech Connect

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  8. 18 CFR 50.8 - Acceptance/rejection of applications.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Acceptance/rejection of applications. 50.8 Section 50.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... ELECTRIC TRANSMISSION FACILITIES § 50.8 Acceptance/rejection of applications. (a) Applications will...

  9. 18 CFR 50.8 - Acceptance/rejection of applications.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Acceptance/rejection of applications. 50.8 Section 50.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... ELECTRIC TRANSMISSION FACILITIES § 50.8 Acceptance/rejection of applications. (a) Applications will...

  10. 10 CFR 110.103 - Acceptance of hearing documents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... outlined in 10 CFR 2.304. (d) A document not meeting the requirements of this section may be returned with... 10 Energy 2 2011-01-01 2011-01-01 false Acceptance of hearing documents. 110.103 Section 110.103... Hearings § 110.103 Acceptance of hearing documents. (a) Each document filed or issued must be...

  11. Structural acceptance criteria Remote Handling Building Tritium Extraction Facility

    SciTech Connect

    Mertz, G.

    1999-12-16

    This structural acceptance criteria contains the requirements for the structural analysis and design of the Remote Handling Building (RHB) in the Tritium Extraction Facility (TEF). The purpose of this acceptance criteria is to identify the specific criteria and methods that will ensure a structurally robust building that will safely perform its intended function and comply with the applicable Department of Energy (DOE) structural requirements.

  12. 10 CFR 1050.202 - Allowable acceptance of gifts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... origination or termination of a flight) is within the United States, it may not be paid for by a foreign... Organization Act, an employee may accept gifts from the International Atomic Energy Agency or other...

  13. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect

    none,

    2013-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept the following: • DOE hazardous and non-hazardous non-radioactive classified waste • DOE low-level radioactive waste (LLW) • DOE mixed low-level waste (MLLW) • U.S. Department of Defense (DOD) classified waste The LLW and MLLW listed above may also be classified waste. Classified waste is the only waste accepted for disposal that may be non-radioactive and shall be required to meet the waste acceptance criteria for radioactive waste as specified in this document. Classified waste may be sent to the NNSS as classified matter. Section 3.1.18 provides the requirements that must be met for permanent burial of classified matter. The NNSA/NFO and support contractors are available to assist the generator in understanding or interpreting this document. For assistance, please call the NNSA/NFO Environmental Management Operations (EMO) at (702) 295-7063, and the call will be directed to the appropriate contact.

  14. Design of Large Momentum Acceptance Transport Systems

    SciTech Connect

    D.R. Douglas

    2005-05-01

    The use of energy recovery to enable high power linac operation often gives rise to an attendant challenge--the transport of high power beams subtending large phase space volumes. In particular applications--such as FEL driver accelerators--this manifests itself as a requirement for beam transport systems with large momentum acceptance. We will discuss the design, implementation, and operation of such systems. Though at times counterintuitive in behavior (perturbative descriptions may, for example, be misleading), large acceptance systems have been successfully utilized for generations as spectrometers and accelerator recirculators [1]. Such systems are in fact often readily designed using appropriate geometric descriptions of beam behavior; insight provided using such a perspective may in addition reveal inherent symmetries that simplify construction and improve operability. Our discussion will focus on two examples: the Bates-clone recirculator used in the Jefferson Lab 10 kW IR U pgrade FEL (which has an observed acceptance of 10% or more) and a compaction-managed mirror-bend achromat concept with an acceptance ranging from 50 to 150 MeV.

  15. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect

    NSTec Environmental Management

    2012-02-28

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept DOE non-radioactive classified waste, DOE non-radioactive hazardous classified waste, DOE low-level radioactive waste (LLW), DOE mixed low-level waste (MLLW), and U.S. Department of Defense (DOD) classified waste for permanent disposal. Classified waste is the only waste accepted for disposal that may be non-radioactive and will be required to meet the waste acceptance criteria for radioactive waste as specified in this document. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project (WMP) at (702) 295-7063, and your call will be directed to the appropriate contact.

  16. Accepted scientific research works (abstracts).

    PubMed

    2014-01-01

    These are the 39 accepted abstracts for IAYT's Symposium on Yoga Research (SYR) September 24-24, 2014 at the Kripalu Center for Yoga & Health and published in the Final Program Guide and Abstracts. PMID:25645134

  17. L-286 Acceptance Test Record

    SciTech Connect

    HARMON, B.C.

    2000-01-14

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  18. Energy dependence of acceptance-corrected dielectron excess mass spectrum at mid-rapidity in Au +Au collisions at √{sNN} = 19.6 and 200 GeV

    NASA Astrophysics Data System (ADS)

    Adamczyk, L.; Adkins, J. K.; Agakishiev, G.; Aggarwal, M. M.; Ahammed, Z.; Alekseev, I.; Alford, J.; Aparin, A.; Arkhipkin, D.; Aschenauer, E. C.; Averichev, G. S.; Banerjee, A.; Bellwied, R.; Bhasin, A.; Bhati, A. K.; Bhattarai, P.; Bielcik, J.; Bielcikova, J.; Bland, L. C.; Bordyuzhin, I. G.; Bouchet, J.; Brandin, A. V.; Bunzarov, I.; Burton, T. P.; Butterworth, J.; Caines, H.; Calder'on de la Barca S'anchez, M.; Campbell, J. M.; Cebra, D.; Cervantes, M. C.; Chakaberia, I.; Chaloupka, P.; Chang, Z.; Chattopadhyay, S.; Chen, J. H.; Chen, X.; Cheng, J.; Cherney, M.; Christie, W.; Codrington, M. J. M.; Contin, G.; Crawford, H. J.; Das, S.; De Silva, L. C.; Debbe, R. R.; Dedovich, T. G.; Deng, J.; Derevschikov, A. A.; di Ruzza, B.; Didenko, L.; Dilks, C.; Dong, X.; Drachenberg, J. L.; Draper, J. E.; Du, C. M.; Dunkelberger, L. E.; Dunlop, J. C.; Efimov, L. G.; Engelage, J.; Eppley, G.; Esha, R.; Evdokimov, O.; Eyser, O.; Fatemi, R.; Fazio, S.; Federic, P.; Fedorisin, J.; Feng; Filip, P.; Fisyak, Y.; Flores, C. E.; Fulek, L.; Gagliardi, C. A.; Garand, D.; Geurts, F.; Gibson, A.; Girard, M.; Greiner, L.; Grosnick, D.; Gunarathne, D. S.; Guo, Y.; Gupta, S.; Gupta, A.; Guryn, W.; Hamad, A.; Hamed, A.; Haque, R.; Harris, J. W.; He, L.; Heppelmann, S.; Hirsch, A.; Hoffmann, G. W.; Hofman, D. J.; Horvat, S.; Huang, H. Z.; Huang, X.; Huang, B.; Huck, P.; Humanic, T. J.; Igo, G.; Jacobs, W. W.; Jang, H.; Jiang, K.; Judd, E. G.; Kabana, S.; Kalinkin, D.; Kang, K.; Kauder, K.; Ke, H. W.; Keane, D.; Kechechyan, A.; Khan, Z. H.; Kikola, D. P.; Kisel, I.; Kisiel, A.; Klein, S. R.; Koetke, D. D.; Kollegger, T.; Kosarzewski, L. K.; Kotchenda, L.; Kraishan, A. F.; Kravtsov, P.; Krueger, K.; Kulakov, I.; Kumar, L.; Kycia, R. A.; Lamont, M. A. C.; Landgraf, J. M.; Landry, K. D.; Lauret, J.; Lebedev, A.; Lednicky, R.; Lee, J. H.; Li, X.; Li, X.; Li, W.; Li, Z. M.; Li, Y.; Li, C.; Lisa, M. A.; Liu, F.; Ljubicic, T.; Llope, W. J.; Lomnitz, M.; Longacre, R. S.; Luo, X.; Ma, L.; Ma, R.; Ma, G. L.; Ma, Y. G.; Magdy, N.; Majka, R.; Manion, A.; Margetis, S.; Markert, C.; Masui, H.; Matis, H. S.; McDonald, D.; Meehan, K.; Minaev, N. G.; Mioduszewski, S.; Mohanty, B.; Mondal, M. M.; Morozov, D. A.; Mustafa, M. K.; Nandi, B. K.; Nasim, Md.; Nayak, T. K.; Nigmatkulov, G.; Nogach, L. V.; Noh, S. Y.; Novak, J.; Nurushev, S. B.; Odyniec, G.; Ogawa, A.; Oh, K.; Okorokov, V.; Olvitt, D. L.; Page, B. S.; Pan, Y. X.; Pandit, Y.; Panebratsev, Y.; Pawlak, T.; Pawlik, B.; Pei, H.; Perkins, C.; Peterson, A.; Pile, P.; Planinic, M.; Pluta, J.; Poljak, N.; Poniatowska, K.; Porter, J.; Posik, M.; Poskanzer, A. M.; Pruthi, N. K.; Putschke, J.; Qiu, H.; Quintero, A.; Ramachandran, S.; Raniwala, R.; Raniwala, S.; Ray, R. L.; Ritter, H. G.; Roberts, J. B.; Rogachevskiy, O. V.; Romero, J. L.; Roy, A.; Ruan, L.; Rusnak, J.; Rusnakova, O.; Sahoo, N. R.; Sahu, P. K.; Sakrejda, I.; Salur, S.; Sandacz, A.; Sandweiss, J.; Sarkar, A.; Schambach, J.; Scharenberg, R. P.; Schmah, A. M.; Schmidke, W. B.; Schmitz, N.; Seger, J.; Seyboth, P.; Shah, N.; Shahaliev, E.; Shanmuganathan, P. V.; Shao, M.; Sharma, M. K.; Sharma, B.; Shen, W. Q.; Shi, S. S.; Shou, Q. Y.; Sichtermann, E. P.; Sikora, R.; Simko, M.; Skoby, M. J.; Smirnov, N.; Smirnov, D.; Solanki, D.; Song, L.; Sorensen, P.; Spinka, H. M.; Srivastava, B.; Stanislaus, T. D. S.; Stock, R.; Strikhanov, M.; Stringfellow, B.; Sumbera, M.; Summa, B. J.; Sun, Y.; Sun, Z.; Sun, X. M.; Sun, X.; Surrow, B.; Svirida, D. N.; Szelezniak, M. A.; Takahashi, J.; Tang, A. H.; Tang, Z.; Tarnowsky, T.; Tawfik, A. N.; Thomas, J. H.; Timmins, A. R.; Tlusty, D.; Tokarev, M.; Trentalange, S.; Tribble, R. E.; Tribedy, P.; Tripathy, S. K.; Trzeciak, B. A.; Tsai, O. D.; Ullrich, T.; Underwood, D. G.; Upsal, I.; Van Buren, G.; van Nieuwenhuizen, G.; Vandenbroucke, M.; Varma, R.; Vasiliev, A. N.; Vertesi, R.; Videbaek, F.; Viyogi, Y. P.; Vokal, S.; Voloshin, S. A.; Vossen, A.; Wang, Y.; Wang, F.; Wang, H.; Wang, J. S.; Wang, G.; Wang, Y.; Webb, J. C.; Webb, G.; Wen, L.; Westfall, G. D.; Wieman, H.; Wissink, S. W.; Witt, R.; Wu, Y. F.; Xiao, Z.; Xie, W.; Xin, K.; Xu, Z.; Xu, Q. H.; Xu, N.; Xu, H.; Xu, Y. F.; Yang, Y.; Yang, C.; Yang, S.; Yang, Q.; Yang, Y.; Ye, Z.; Yepes, P.; Yi, L.; Yip, K.; Yoo, I.-K.; Yu, N.; Zbroszczyk, H.; Zha, W.; Zhang, J. B.; Zhang, X. P.; Zhang, S.; Zhang, J.; Zhang, Z.; Zhang, Y.; Zhang, J. L.; Zhao, F.; Zhao, J.; Zhong, C.; Zhou, L.; Zhu, X.; Zoulkarneeva, Y.; Zyzak, M.

    2015-11-01

    The acceptance-corrected dielectron excess mass spectra, where the known hadronic sources have been subtracted from the inclusive dielectron mass spectra, are reported for the first time at mid-rapidity |yee | < 1 in minimum-bias Au +Au collisions at √{sNN} = 19.6 and 200 GeV. The excess mass spectra are consistently described by a model calculation with a broadened ρ spectral function for Mee < 1.1 GeV /c2. The integrated dielectron excess yield at √{sNN} = 19.6 GeV for 0.4 energies.

  19. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect

    NSTec Environmental Management

    2010-09-03

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

  20. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect

    NSTec Environmental Management

    2011-01-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

  1. Nevada test site waste acceptance criteria

    SciTech Connect

    1996-09-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  2. Community energy systems and the law of public utilities. Volume thirty-eight. Oklahoma. Final report of a study of the impacts of regulations affecting the acceptance of integrated community energy systems

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.

    1981-01-01

    A detailed description is given of the laws and programs of the State of Oklahoma governing the regulation of public energy utilities, the siting of energy generating and transmission facilities, the municipal franchising of public energy utilities, and the prescription of rates to be charged by utilities including attendant problems of cost allocations, rate base and operating expense determinations, and rate of return allowances. These laws and programs are analyzed to identify impediments which they may present to the implementation of Integrated Community Energy Systems (ICES). This report is one of fifty-one separate volumes which describe such regulatory programs at the Federal level and in each state as background to the report entitled Community Energy Systems and the Law of Public Utilities, Volume One: An Overview. This report also contains a summary of a strategy described in Volume One: An Overview for overcoming these impediments by working within the existing regulatory framework and by making changes in the regulatory programs to enhance the likelihood of ICES implementation.

  3. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Arizona. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    This report is one of a series of preliminary reports describing the laws and regulatory programs of the United States and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. This report describes laws and regulatory programs in Arizona. The Arizona state constitution establishes the Arizona Corporation Commission to regulate public service corporations. Within the area of its jurisdiction, the Commission has exclusive power and may not be interfered with by the legislature except in one narrow instance as described in the case Corporation Commission v. Pacific Greyhound Lines.

  4. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in the United States. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    This report is a summary of a series of preliminary reports describing the laws and regulatory programs of the United states and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). A brief summary of public utility regulatory programs, energy facility siting programs, and municipal franchising authority is presented in this report to identify how such programs and authority may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. Subsequent reports will (1) describe public utility rate regulatory procedures and practices as they might affect an ICES, (2) analyze each of the aforementioned regulatory programs to identify impediments to the development of ICES, and (3) recommend potential changes in legislation and regulatory practices and procedures to overcome such impediments.

  5. Defining acceptable conditions in wilderness

    NASA Astrophysics Data System (ADS)

    Roggenbuck, J. W.; Williams, D. R.; Watson, A. E.

    1993-03-01

    The limits of acceptable change (LAC) planning framework recognizes that forest managers must decide what indicators of wilderness conditions best represent resource naturalness and high-quality visitor experiences and how much change from the pristine is acceptable for each indicator. Visitor opinions on the aspects of the wilderness that have great impact on their experience can provide valuable input to selection of indicators. Cohutta, Georgia; Caney Creek, Arkansas; Upland Island, Texas; and Rattlesnake, Montana, wilderness visitors have high shared agreement that littering and damage to trees in campsites, noise, and seeing wildlife are very important influences on wilderness experiences. Camping within sight or sound of other people influences experience quality more than do encounters on the trails. Visitors’ standards of acceptable conditions within wilderness vary considerably, suggesting a potential need to manage different zones within wilderness for different clientele groups and experiences. Standards across wildernesses, however, are remarkably similar.

  6. From requirements to acceptance tests

    NASA Technical Reports Server (NTRS)

    Baize, Lionel; Pasquier, Helene

    1993-01-01

    From user requirements definition to accepted software system, the software project management wants to be sure that the system will meet the requirements. For the development of a telecommunication satellites Control Centre, C.N.E.S. has used new rules to make the use of tracing matrix easier. From Requirements to Acceptance Tests, each item of a document must have an identifier. A unique matrix traces the system and allows the tracking of the consequences of a change in the requirements. A tool has been developed, to import documents into a relational data base. Each record of the data base corresponds to an item of a document, the access key is the item identifier. Tracing matrix is also processed, providing automatically links between the different documents. It enables the reading on the same screen of traced items. For example one can read simultaneously the User Requirements items, the corresponding Software Requirements items and the Acceptance Tests.

  7. Simulation of large acceptance LINAC for muons

    SciTech Connect

    Miyadera, H; Kurennoy, S; Jason, A J

    2010-01-01

    There has been a recent need for muon accelerators not only for future Neutrino Factories and Muon Colliders but also for other applications in industry and medical use. We carried out simulations on a large-acceptance muon linac with a new concept 'mixed buncher/acceleration'. The linac can accept pions/muons from a production target with large acceptance and accelerate muon without any beam cooling which makes the initial section of muon-linac system very compact. The linac has a high impact on Neutrino Factory and Muon Collider (NF/MC) scenario since the 300-m injector section can be replaced by the muon linac of only 10-m length. The current design of the linac consists of the following components: independent 805-MHz cavity structure with 6- or 8-cm-radius aperture window; injection of a broad range of pion/muon energies, 10-100 MeV, and acceleration to 150 - 200 MeV. Further acceleration of the muon beam are relatively easy since the beam is already bunched.

  8. Nitrogen trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco`s facility.

  9. Helping Our Children Accept Themselves.

    ERIC Educational Resources Information Center

    Gamble, Mae

    1984-01-01

    Parents of a child with muscular dystrophy recount their reactions to learning of the diagnosis, their gradual acceptance, and their son's resistance, which was gradually lessened when he was provided with more information and treated more normally as a member of the family. (CL)

  10. Acceptability of Treatments for Plagiarism

    ERIC Educational Resources Information Center

    Carter, Stacy L.; Punyanunt-Carter, Narissra Maria

    2007-01-01

    This study focused on various treatments for addressing incidents of plagiarism by college students. College students rated the acceptability of different responses by college faculty to a case description of a college student who engaged in plagiarism. The findings revealed that students found some methods of addressing this problem behavior by…

  11. Euthanasia Acceptance: An Attitudinal Inquiry.

    ERIC Educational Resources Information Center

    Klopfer, Fredrick J.; Price, William F.

    The study presented was conducted to examine potential relationships between attitudes regarding the dying process, including acceptance of euthanasia, and other attitudinal or demographic attributes. The data of the survey was comprised of responses given by 331 respondents to a door-to-door interview. Results are discussed in terms of preferred…

  12. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Alabama. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Alabama legislature has created the Public Service Commission which has general supervisory powers over utilities. The PSC consists of a president and two associates, who are elected to four-year terms. The PSC has no jurisdiction over municipal utilities and, as a result, local governments retain the power to regulate the operation of their municipally-owned utilities. Municipalities also retain their police power over streets and highways within their territory. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  13. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New Jersey. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate the operations of public utilities in New Jersey is generally vested in the Board of Public Utilities. The Board is subsumed within the Department of Energy for administrative purposes, but functions largely independently of supervision or control by that agency. The Board is composed of three members who serve for six-year terms. They are appointed by the governor with the advice and consent of the senate. Within the purview of its powers, the authority of the Board supersedes that of local governments. The Board, for example, may grant exemptions from local zoning provisions, and has approving authority over privileges or franchises granted by municipalities to public utilities. The Board, however, cannot override the refusal of a municipality to grant consent to the initiation of operations by a public utility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  14. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in South Dakota. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The South Dakota Public Utilities Commission is authorized by statute to regulate gas and electric utilities. The Commission consists of three elected commissioners each of whom serves for a six year term. The Commissioners are elected by district and each must, at the time of election, be a resident of the district from which he has been elected. Each Commissioner must reside in the state capital and devote his entire time to the duties of his office. The Commission is part of the Department of Commerce and Consumer Protection. Municipal power to regulate privately owned electric and gas public utilities was terminated in 1975. A municipally-owned electric utility has the authority to regulate the sale, use, and rates of electric power and energy which it provides. The Commission has no authority to regulate steam, heat, and refrigeration systems; that power resides in cities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  15. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Nebraska. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The state agency with principal authority to regulate electric public utilities is the Power Review Board (Board). However, the Board in fact, exercised little regulatory authority over heat and power utilities because all electrical power in Nebraska is currently supplied by public authorities and is not subject to regulation by the Board. Gas and water utilities are also subject to general supervision by municipalities. The Board is compised of five members - an attorney, an engineer, one accountant, two lay - persons appointed by the governor and confirmed by the legislature. All members are appointed to overlapping four-year terms, and none may serve more than two consecutive terms. Decisions by the Board require the approval of a majority of its members. The Public Service Commission of Nebraska is a constitutionally created body. Its powers and duties include the regulation of rates, service, and general control of common carriers as the legislature may provide by law. Other state agencies also possess limited regulatory jurisdiction which may be relevant to an energy facility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  16. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New Hampshire. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Public utilities in New Hampshire are regulated by the Public Utilities Commission. The Commission is comprised of three members appointed for six-year terms by the Governor with the advice and consent of the council. Members of the Commission must be free from any employment or pecuniary interests in any public utility. The Commission is charged with the general regulation and supervision of public utilities. Within the purview of its powers, the authority of the Commission supercedes that of local government. The Commission may suspend the operation of local zoning laws. Local governments do retain the right to license the use of public ways by utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  17. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Indiana. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Public Service Commission of Indiana. The Commission is comprised of three members appointed by the governor. Commissioners are appointed for four-year terms. They must be free from any employment or pecuniary interest in any public utility. Indiana courts have stated that the Commission was created and vested with regulatory authority over public utilities in order to relieve these utilities from local regulation. Local governments do, however, have specific statutory authority to determine, by contract or ordinance, the quality and character of service to be provided by public utilities within the municipality. Local governments may also regulate the use of streets and other public property by public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  18. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Vermont. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Vermont Public Service Board (PSC). The PSB is comprised of three members appointed by the governor with the advice and consent of the senate. PSB members serve six year terms. Members must be free from any employment or pecuniary interests in any company subject to the supervision of the PSB. Local governments retain little regulatory authority over public utilities. Local governments are responsible for regulating the use of streets and other public property, but any person aggrieved by a local decision may appeal to the PSB within thirty days. The PSB is to review the local action at a public hearing and its decision is final. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  19. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Missouri. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Missouri is vested in the Public Service Commission. The Commission is composed of five members who are appointed by the governor with the advice and consent of the senate. Commissioners are appointed for a term of six years. Commissioners must be free from any employment or pecuniary interests incompatible with the duties of the Commission. The Commission is charged with the general supervision of public utilities. The Public Service Commission Law passed in 1913, makes no provision for the regulation of public utilities by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  20. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in West Virginia. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the West Virginia Public Service Commission, comprised of three members appointed by the governor with the advice and consent of the state senate. Commissioners are appointed for six year terms. They must be free from any pecuniary or employment interest in public utilities. The Commission possesses the exclusive authority to regulate public utilities. While local governments retain the power to control the use of their streets and to grant franchises to public utilities, they cannot use this power to infringe on the exercise of regulatory power by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  1. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Tennessee. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Tennessee Public Service Commission has been designated by the legislature as the agency primarily responsible for the regulation of public utilities and carriers. The Commission is comprised of three members elected by the voters of the state. Each member of the Commission serves a six-year term. The Commission is given broad supervisory control over public utilities in the public utilities statute. Included under its authority is the power to determine whether a privilege or franchise granted to a public utility by a municipality is necessary and proper for the public convenience. No privilege or franchise is valid until it has been approved by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  2. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Connecticut. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Connecticut statutes expressly provide for the regulation of public utilities. As of January 1, 1979, responsibility for the regulation of utilities is vested in the Public Utilities Control Authority (PUCA). Formerly such authority was exercised by the Public Utilities Commission which has been abolished and replaced by the PUCA. The Public Utilities Act provides that the PUCA is to consist of five members appointed by the governor with the advice and consent of both houses of the general assembly. It should be noted that statutory references to the Public Utilities Commission are deemed to mean the Public Utilities Control Authority. The statute gives only a minor role to local government in regulating public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  3. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Florida. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Florida Public Service Commission. The Commission is comprised of five members appointed by the governor with the approval of the senate. The governor must choose his appointees from a list of persons recommended by the nine-person Florida Public Service Commission Nominating Council. Commissioners serve either three- or four-year terms. They must be free from any employment or pecuniary interests in any utility subject to the jurisdiction of the Commission. Within the purview of its powers, the authority of the Commission supersedes that of local governments. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  4. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Delaware. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The regulation of public utilities in Delaware is the responsibility of the Public Service Commission (PSC). The PSC consists of five commissioners appointed by the governor and confirmed by a majority of the senate for terms of five years each. Not more than three members are to be from the same political party. One member is to be a resident of Kent County, one of Sussex County, one of the City of Wilmington, and two members are to be of New Castle County outside of Wilmington. Local governments retain control over the rates, property, equipment, facilities, and franchises of municipally owned utilities. Such utilities are expressly exempted from PSC regulation. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  5. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Wyoming. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested in the Wyoming Public Service Commission. The Commission is comprised of three members appointed by the Governor with the advice and consent of the state senate. Each member of the Commission serves a six-year term and no more than two members may be from the same political party. The Commission has exclusive regulatory authority over public utilities. The statutory definition of public utility, however, does not include municipally-owned and operated utility systems to the extent they provide services within the municipality. Such utilities are regulated locally. The Commission reviews no documentation of rates or services of municipallyy-owned systems. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  6. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Virginia. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilties is vested generally in the State Corporation Commission. The Commission is comprised of three members elected by a joint vote of the two houses of the general assembly. Commissioners serve six-year terms. They must be free from any employment or pecuniary interests in any company subject to the supervision and regulation of the Commission. The Commission is charged with the primary responsibility of supervising and regulating public utilities. However, local governments retain the power to grant franchises and otherwise regulate the use of streets and other public property. In addition, municipally-owned utilities are not within the jurisdiction of the Commission to the extent that they operate within corporate limits. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  7. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Utah. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Utah Public Service Commission comprised of three members appointed by the governor with the consent of the State Senate. Commission members are appointed for six-year terms and must be free from employment and pecuniary interests incompatible with the duties of the Commission. The Commission is charged with the general supervision of public utilities, but its authority does not extend to municipally-owned utilities. Local governments are forbidden from exercising any regulatory powers over public utilities unless the utility is municipally-owned. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  8. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Site identification as potentially acceptable. 960.3-1-4-1... as potentially acceptable. The evidence for the identification of a potentially acceptable site shall... general and less detailed than that required for the nomination of a site as suitable for...

  9. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Site identification as potentially acceptable. 960.3-1-4-1 Section 960.3-1-4-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-1-4-1 Site identification as potentially acceptable. The...

  10. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Site identification as potentially acceptable. 960.3-1-4-1 Section 960.3-1-4-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-1-4-1 Site identification as potentially acceptable. The...

  11. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Site identification as potentially acceptable. 960.3-1-4-1 Section 960.3-1-4-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-1-4-1 Site identification as potentially acceptable. The...

  12. 10 CFR 603.545 - Acceptability of costs of prior RD&D.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Acceptability of costs of prior RD&D. 603.545 Section 603.545 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Cost Sharing § 603.545 Acceptability of costs of prior RD&D....

  13. 10 CFR 603.540 - Acceptability of fully depreciated real property or equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Acceptability of fully depreciated real property or equipment. 603.540 Section 603.540 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Pre-Award Business Evaluation Cost Sharing § 603.540 Acceptability of fully...

  14. 10 CFR 300.12 - Acceptance of reports and registration of entity emission reductions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Acceptance of reports and registration of entity emission reductions. 300.12 Section 300.12 Energy DEPARTMENT OF ENERGY CLIMATE CHANGE VOLUNTARY GREENHOUSE GAS REPORTING PROGRAM: GENERAL GUIDELINES § 300.12 Acceptance of reports and registration of entity...

  15. 10 CFR 300.12 - Acceptance of reports and registration of entity emission reductions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Acceptance of reports and registration of entity emission reductions. 300.12 Section 300.12 Energy DEPARTMENT OF ENERGY CLIMATE CHANGE VOLUNTARY GREENHOUSE GAS REPORTING PROGRAM: GENERAL GUIDELINES § 300.12 Acceptance of reports and registration of entity...

  16. 10 CFR 300.12 - Acceptance of reports and registration of entity emission reductions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Acceptance of reports and registration of entity emission reductions. 300.12 Section 300.12 Energy DEPARTMENT OF ENERGY CLIMATE CHANGE VOLUNTARY GREENHOUSE GAS REPORTING PROGRAM: GENERAL GUIDELINES § 300.12 Acceptance of reports and registration of entity...

  17. THE ENVIRONMENTAL TECHNOLOGIES ACCEPTANCE (ETA) PROGRAM

    SciTech Connect

    Christina B. Behr-Andres

    2001-10-01

    The objective of the Environmental Technologies Acceptance (ETA) Program at the Energy & Environmental Research Center (EERC) is to advance the development, commercial acceptance, and timely deployment of selected private sector technologies for the cleanup of sites in the nuclear defense complex as well as the greater market. As a result of contract changes approved by National Energy Technology Laboratory (NETL) representatives to incorporate activities previously conducted under another NETL agreement, there are now an additional task and an expansion of activities within the stated scope of work of the ETA program. As shown in Table 1, this cooperative agreement, funded by NETL (No. DE-FC26-00NT40840), consists of four tasks: Technology Selection, Technology Development, Technology Verification, and System Engineering. As currently conceived, ETA will address the needs of as many technologies as appropriate under its current 3-year term. There are currently four technical subtasks: Long-Term Stewardship Initiative at the Mound Plant Site; Photocatalysis of Mercury-Contaminated Water; Subcritical Water Treatment of PCB and Metal-Contaminated Paint Waste; and Vegetative Covers for Low-Level Waste Repositories. This report covers activities during the second six months of the three-year ETA program.

  18. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Oklahoma. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Oklahoma Corporation Commission was created by the state constitution, for the purpose of regulating transportation and transmission companies. The Constitution also provides that the Commission may be vested with such additional powers, and charged with such other duties (not inconsistent with this Constitution). Pursuant to this power to regulate the legislature has given the Commission the power to regulate certain public utilities, including electric, gas, and steam. The Commission is composed of three members who are elected to staggered, six-year terms. A commissioner may not have any interests incompatible with the duties of the Commission. The Commission is charged with the general supervision of public utilities. Local governments have no role in the regulation of public utilities although municipalities do have the power to grant franchises. The constitution allows the legislature to pass laws giving cities, towns, and counties the right to regulate the rates and services of their franchises operating within the boundaries of the city, town, or county, although there are no such laws in effect at the present time. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  19. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New York. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the New York Public Service Commission. The Commission is composed of five members appointed by the governor with the advice and consent of the senate. Commissioners are appointed for six-year terms. Commissioners may not have any pecuniary or financial interest in any public utility. Local governing bodies are authorized to exercise such power, jurisdiction and authority in enforcing the laws of the state and the orders, rules, and regulations of the commission as may be prescribed by statute or by the commission with respect to public utilities. A Commission spokesman confirmed that no statutes have been passed pursuant to this provision and the Commission has not ceded any of its regulatory powers to local governments. With the exception of the granting of franchises and permits to use public ways, local governments exercise no regulatory powers over public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  20. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Pennsylvania. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is generally vested in the Pennsylvania Public Utility Commission. The Commission is comprised of five members appointed by the governor with the advice and consent of two-thirds of the senate. Commission members are appointed for 10 year terms. They must be free from any employment which is incompatible with the duties of the Commission, and are subject to a statutory code of ethics. The Commission is charged with responsibility for enforcing the Public Utility Law. Within the purview of its powers, the authority of the Commission supersedes that of local governments. The Commission, for example, may grant exemptions from local zoning requirements, and has approving authority over privileges or franchises granted by municipalities to public utilities. The Commission, however, has no authority over municipally owned utilities operating within municipal boundaries. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  1. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in North Carolina. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Under the Public Utilities Act of 1965, utilities in North Carolina are regulated by the State's Utility Commission. The Commission consists of seven members who are appointed by the governor, subject to confirmation by the General Assembly sitting in joint session. The Commissioners serve eight year terms and the governor designates one of the commissioners as chairman. The Commission has an office of the executive director, who is appointed to a six year term by the governor subject to confirmaion by the General Assembly. The executive director heads the Commission's public staff. The public staff's duties include reviewing, investigating, and making recommendations on utility rates and services and intervention on behalf of the public in proceedings affecting consumer rates and generating plant certification. The Commission has the same power to regulate the operation of privately-owned public utilities within municipalities as it has to control those ouside. The only power over privately-owned utilities reserved to the municipalities is the power to grant franchises. A municipality may maintain its own utility systems, and such systems are not subject to the control and jurisdiction of the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  2. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in South Carolina. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Pursuant to constitutional South Carolina mandate the General Assembly has created the Public Service Commission. The Commission is composed of seven members elected to four year terms by the General Assembly. One commissioner is elected from each of seven districts corresponding to the congressional districts as they existed as of January 1, 1930. The commissioners elect one of their members as chairman. The South Carolina statutes contain separate chapters dealing with the regulation of public utilities and electric utilities. Public utility includes the furnishing of gas or heat (other than by means of electricity) to the public. While the Commission is granted general supervisory and regulatory powers over public utilities and electric utilities, total governments retain some control over electrical utilities. All municipality's have the power to grant exclusive franchises to such utilities for the furnishing of light to the municipality and its inhabitants. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  3. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Minnesota. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Minnesota Public Service Commission (PSC) in the Department of Public Service is authorized by statute to regulate public utilities. The PSC consists of five members appointed by the governor with the advice and consent of the senate to terms running for six years. Not more than three commissioners are to belong to the same political party. The commissioners are not to derive any significant portion of their income directly or indirectly from any public utility. Municipalities also have a limited role in the regulation of public utilities. If the municipality controls the exercise of a public utility franchise, it is authorized to assist the PSC as amicus curiae in proceedings with respect to the rates, fares, prices, regulation, or control of a utility operating in the municipality. Municipal utilities are exempt from regulation by the PSC because municipal utilities are presently effectively regulated by the residents of the municipalities which own and operate them. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  4. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in North Dakota. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The North Dakota Public Service Commission (PSC) is a constitutional body responsible for the regulation of all public utilities. The PSC is composed of three elected commissioners who serve for six year terms. Section 83 of the state's Constitution gives the legislature the power to prescribe the powers and duties of the PCS. Pursuant to this authorization, the legislature adopted Title 49 of the North Dakota Century Code prescribing the jurisdiction as well as the powers and duties of the PSC. It also prescribes various rules and regulations pertaining to electric, gas, and other public utilities. All authority over public utilities is vested in the PSC. Local governments, except for the powers inherent in their franchising and zoning authority, are not given any control over utility regulation. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  5. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Ohio. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Public Utilities Commission (PUCO) is a body created by the Ohio State legislature to administer the provisions of the Ohio Public Utilities Act. It is composed of three commissioners appointed by the governor with the advice and consent of the senate. Once appointed, a commissioner serves for a six-year period. The PUCO is vested with the power and jurisdiction to supervise and regulate public utilities and railroads... . The term public utility includes every corporation, company, co-partnership, person or association, their lessees, trustees, or receivers, as defined in the Ohio Code. Among the various services enumerated in the Code under the definition of public utility are an electric light company; a gas company; a pipeline company transporting gas, oil or coal; a waterworks company; a heating or cooling company. The power to regulate public utilities is shared by the PUCO and municipal governments. The municipal regulatory authority is derived from the Ohio Constitution, statutory provisions, and municipal franchising authority. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  6. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Georgia. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Public Service Commission. The Commission is composed of five members elected to six-year terms by the general electorate. Commissioners must be free of employment or pecuniary interests which are incompatible with the duties of the Commission. The Commission is the only agency that may exert regulatory control over public utilities. The legislature has delegated no regulatory authority to local government. Except for the powers incident to granting a franchise and its normal police powers, municipal corporations do not have any role in the supervision of public utilities. The Commission's general supervisory authority does not extend to public utilities owned or operated by municipal corporations. The jurisdiction of the Commission extends to several specific public utilities, including gas or electric light and power companies. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  7. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Maryland. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Maryland is vested in the Public Service Commission under the authority of the Public Service Commission Law. The Commission consists of five commissioners who are appointed by the governor with the advice and consent of the Senate. Commissioners must be or become citizens of Maryland, at least three are to serve full time, and one of the commissioners is to be nominated as chairman. The tenure of each commissioner is six years and their terms are on a staggered schedule. Commissioners are eligible for reappointment. The Public Service Commission Law provides that the Commission's powers an jurisdiction shall extend to the full extent permitted by the Constitution and laws of the United States. Local governments in Maryland are not given regulatory power over public service companies. The only power that local governments have over the operations of utilities is the power to grant franchises. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  8. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Mississippi. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Mississippi is vested generally in the Public Service Commission, composed of three members elected for four year terms from separate districts of the state. Within the purview of its powers, the authority of the Commission supersedes that of local governments. It is empowered to amend municipal franchises that contain provisions conflicting with its exclusive jurisdiction over the rates and standards of service of public utilities. Local governments play a role in regulating public utilities only through the exercise of their zoning and franchising powers. They may also operate their own utilities which are totally exempt from Commission control, unless they provide services more than one mile beyond their corporate boundaries. Other than a procedure in which certain provisions in municipal franchises may be subject to modification by the Commission, there is no process by which the decisions of local government respecting utilities are reviewed by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  9. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in California. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Constitution of the State of California grants to the Legislature control over persons and private corporations that own or operate a line, plant, or system for the production, generation, or transmission of heat, light, water, or power to be furnished either directly or indirectly to or for the public. The Constitution establishes the Public Utilities Commission and grants certain specific powers to the PUC, including the power to fix rates, establish rules and prescribe a uniform system of accounts. The Constitution also recognizes that the Legislature has plenary power to confer additional authority and jurisdiction upon the PUC. The Constitution prohibits regulation by a city, county, or other municipal body of matters over which the Legislature has granted regulatory power to the PUC. This provision does not, however, impair the right of any city to grant franchises for public utilities. The California legislature has enacted the California Public Utilities Code and has designated the PUC as the agency to implement the regulatory provisions of the Code. The Public Utilities Commission consists of five members appointed by the governor and approved by the senate, a majority of the membership concurring, for staggered 6-year terms. Certain limited powers over the conduct of public utilities may still be exercised by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  10. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Oregon. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Public Utility Commissioner of Oregon. The Commissioner is appointed by the governor, subject to confirmation by the senate, for a term of four years. He must be free of any pecuniary or employment interest in any business subject to the jurisdiction of the Commissioner. While the Commissioner is primarily responsible for regulating public utilities, local governments do retain some control over utility operations within municipal boundaries. A local government may determine by contract or prescribe by ordinance the quality and character of service furnished by a public utility and may control the use of streets and other public property by public utilities. Municipalities may require public utilities to make any modifications, additions, or extensions to facilities as are necessary to the public interest. In addition, local governments may fix, by contract or ordinance, the rates to be charged by public utilities furnishing service within a municipality. The Commissioner, however, has the power to review any of the above-described local actions. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  11. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Maine. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Maine Supreme Court holds that the regulation of the operations of public utilities is an exercise of the police powers of the state. The legislature has delegated such regulatory authority to the Maine Public Utilities Commission (PUC). The statutes provide no role for local government in the regulation of public utilities. The PUC consists of three full time members, appointed by the Governor subject to review by the Joint Standing Committee on Public Utilities and to confirmation by the Legislature. They each serve seven year terms. One member is designated by the Governor as chairman. The Commission appoints a secretary, assistant secretary, director of transportation, and, with the approval of the Attorney General, a general counsel. A member of the PUC cannot have any official or professional connection or relation with or hold any stock or securities in any public utility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  12. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Texas. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Texas is generally vested in the Public Utilities Commission. The Commission is comprised of three members appointed by the governor, with the advice of at least two-thirds of the senate, for a six-year term. Prior to the passage of the Texas Public Utility Regulatory Act (PURA) in 1975, the power to regulate public utilities was vested almost exclusively in municipalities. Under PURA, municipalities retain exclusive original jurisdiction over all electric, water, and sewer utilities within the municipality. PURA provides that all regulations pertaining to public utilities promulgated by local regulatory agencies remain in effect unless they are superceded by Commission rules. The municipality's governing body is required to exercise its regulatory authority under rules and standards consistent with those promulgated by the Commission. The Commission has exclusive appellate jurisdiction to review orders and ordinances of regulatory municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  13. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Alaska. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Alaska Public Utilities Commission is a subagency of the Department of Commerce and Economic Development Department. The Department has general authority to enforce state laws regulating public utilities. The Commission (formerly called the Public Service Commission) was created in 1959. It is made up of five members appointed by the governor and confirmed by the legislature. One of the members is designated by the governor as chairman of the Commission. Members serve six-year terms with the exception of the chairman who serves a four-year term. Members must be qualified as follows: one must be an attorney, one must be an engineer, one must be a graduate of an accredited university with a major in finance, accounting, or business administration, and two must be consumers. The role of local governments in regulating public utilities subject to Commission jurisdiction is limited to the imposition of reasonable fees and conditions for the use of streets and other public property. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  14. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Kansas. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Kansas legislature has created the State Corporation Commission and given the Commission full power, authority, and jurisdiction to supervise and control public utilities. The Commission is empowered to do all things necessary and convenient for the exercise of such power, authority and jurisdiction. The Commission is composed of three members, appointed by the governor by and with the consent of the senate. The Commissioners' appointment is for a four year term. The Commission elects one of its members as chairperson. The Kansas statutes provides that the power and authority to control and regulate all public utilities and common carriers situated and operated wholly or principally within any city or principally operated for the benefit of such city or its people, shall be vested exclusively in such city. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  15. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Idaho. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Idaho state legislature has created the Idaho Public Utilities Commission and has given the Commission the power and jurisdiction to supervise and regulate every public utility in the state. The Commission is comprised of three members appointed by the governor with the approval of the senate. Commissioners serve full time and are appointed for six year terms. No more than two of the members may be from the same political party. Title 61 of the Idaho Code, which establishes the Commission and delineates its powers, vests all regulatory responsibility in the Commission to the exclusion of local government. However, as an incident to their franchising power, municipalities may impose reasonable regulations on the use of their streets. The Idaho Supreme Court holds that the transfer of regulatory power over public utilities to the Commission did not diminish the powers and duties of municipalities to control and maintain their streets and alleys. Limited statutory authority also exists giving municipalities the power to regulate the fares, rates, rentals, or charges made for the service rendered under any franchise granted in such city, except such as are subject to regulation by the Public Utilities Commission. With the exception of this limited power, the Commission is the sole agency having regulatory power over Idaho public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  16. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Arkansas. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Arkansas state constitution contains no provision dealing with public utility regulation. Title 73 of the Arkansas Statutes specifically provides for the regulation of public utilities. The Arkansas Public Service Commission is established by statute as a subagency of the Department of Commerce and is responsible for regulating electric, steam heating, and certain other kinds of utilities. The Commission consists of three members, each appointed by the governor with the approval of the Senate for a term of six years. The Commission has authority over all matters pertaining to the regulation and operation of gas companies, electric companies, and hydro-electric companies among other utilities enumerated in the statute. The role of local governments in the regulation of public utilities has been reduced by recent legislation. Municipal councils formerly had the power to regulate rate-making for investor owned utilities operating within their boundaries. However, as a result of 1977 amendments to the Public Utilities Act, ratemaking for privately owned electric, gas, telephone, and sewer utilities is now within the exclusive jurisdiction of the Public Service Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  17. Stakeholder acceptance analysis ResonantSonic drilling

    SciTech Connect

    Peterson, T.

    1995-12-01

    This report presents evaluations, recommendations, and requirements concerning ResonantSonic Drilling (Sonic Drilling), derived from a three-year program of stakeholder involvement. Sonic Drilling is an innovative method to reach contamination in soil and groundwater. The resonant sonic drill rig uses counter-rotating weights to generate energy, which causes the drill pipe to vibrate elastically along its entire length. In the resonant condition, forces of up to 200,000 pounds are transmitted to the drill bit face to create a cutting action. The resonant energy causes subsurface materials to move back into the adjacent formation, permitting the drill pipe to advance. This report is for technology developers and those responsible for making decisions about the use of technology to remediate contamination by volatile organic compounds. Stakeholders` perspectives help those responsible for technology deployment to make good decisions concerning the acceptability and applicability of sonic drilling to the remediation problems they face.

  18. Acceptability of reactors in space

    SciTech Connect

    Buden, D.

    1981-04-01

    Reactors are the key to our future expansion into space. However, there has been some confusion in the public as to whether they are a safe and acceptable technology for use in space. The answer to these questions is explored. The US position is that when reactors are the preferred technical choice, that they can be used safely. In fact, it dies not appear that reactors add measurably to the risk associated with the Space Transportation System.

  19. Acceptability of reactors in space

    SciTech Connect

    Buden, D.

    1981-01-01

    Reactors are the key to our future expansion into space. However, there has been some confusion in the public as to whether they are a safe and acceptable technology for use in space. The answer to these questions is explored. The US position is that when reactors are the preferred technical choice, that they can be used safely. In fact, it does not appear that reactors add measurably to the risk associated with the Space Transportation System.

  20. Reactor tank UT acceptance criteria

    SciTech Connect

    Daugherty, W.L.

    1990-01-30

    The SRS reactor tanks are constructed of type 304 stainless steel, with 0.5 inch thick walls. An ultrasonic (UT) in-service inspection program has been developed for examination of these tanks, in accordance with the ISI Plan for the Savannah River Production Reactors Process Water System (DPSTM-88-100-1). Prior to initiation of these inspections, criteria for the disposition of any indications that might be found are required. A working group has been formed to review available information on the SRS reactor tanks and develop acceptance criteria. This working group includes nationally recognized experts in the nuclear industry. The working group has met three times and produced three documents describing the proposed acceptance criteria, the technical basis for the criteria and a proposed initial sampling plan. This report transmits these three documents, which were prepared in accordance with the technical task plan and quality assurance plan for this task, task 88-001-A- 1. In addition, this report summarizes the acceptance criteria and proposed sampling plan, and provides further interpretation of the intent of these three documents where necessary.

  1. 12 CFR 7.1007 - Acceptances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Acceptances. 7.1007 Section 7.1007 Banks and... § 7.1007 Acceptances. A national bank is not limited in the character of acceptances it may make in financing credit transactions. Bankers' acceptances may be used for such purpose, since the making...

  2. 12 CFR 7.1007 - Acceptances.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 1 2011-01-01 2011-01-01 false Acceptances. 7.1007 Section 7.1007 Banks and... § 7.1007 Acceptances. A national bank is not limited in the character of acceptances it may make in financing credit transactions. Bankers' acceptances may be used for such purpose, since the making...

  3. 21 CFR 820.86 - Acceptance status.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Acceptance status. 820.86 Section 820.86 Food and... QUALITY SYSTEM REGULATION Acceptance Activities § 820.86 Acceptance status. Each manufacturer shall identify by suitable means the acceptance status of product, to indicate the conformance or...

  4. 12 CFR 615.5550 - Bankers' acceptances.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Bankers' acceptances. 615.5550 Section 615.5550... POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Bankers' Acceptances § 615.5550 Bankers' acceptances. Banks for cooperatives may rediscount with other purchasers the acceptances they have created. The bank...

  5. 48 CFR 245.606-3 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Acceptance. 245.606-3... Contractor Inventory 245.606-3 Acceptance. (a) If the schedules are acceptable, the plant clearance officer shall, within 15 days, complete and send the contractor a DD Form 1637, Notice of Acceptance...

  6. 48 CFR 12.402 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Acceptance. 12.402 Section... Acceptance. (a) The acceptance paragraph in 52.212-4 is based upon the assumption that the Government will rely on the contractor's assurances that the commercial item tendered for acceptance conforms to...

  7. 21 CFR 820.86 - Acceptance status.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Acceptance status. 820.86 Section 820.86 Food and... QUALITY SYSTEM REGULATION Acceptance Activities § 820.86 Acceptance status. Each manufacturer shall identify by suitable means the acceptance status of product, to indicate the conformance or...

  8. 12 CFR 615.5550 - Bankers' acceptances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Bankers' acceptances. 615.5550 Section 615.5550... POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Bankers' Acceptances § 615.5550 Bankers' acceptances. Banks for cooperatives may rediscount with other purchasers the acceptances they have created. The bank...

  9. 48 CFR 12.402 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acceptance. 12.402 Section... Acceptance. (a) The acceptance paragraph in 52.212-4 is based upon the assumption that the Government will rely on the contractor's assurances that the commercial item tendered for acceptance conforms to...

  10. Social Acceptance of Wind Power in the United States: Evaluating Stakeholder Perspectives (Poster)

    SciTech Connect

    Tegen, S.; Lantz, E.

    2009-05-01

    As the wind industry strives to achieve 20% wind energy by 2030, maintaining high levels of social acceptance for wind energy will become increasingly important. Wind Powering America is currently researching stakeholder perspectives in the U.S. market and reviewing findings from wind energy projects around the world to better understand social acceptance barriers. Results from European studies show that acceptance varies widely depending on local community values. A preliminary survey shows similar results in the United States. Further research will be conducted to refine our understanding of key social acceptance barriers and evaluate the best ways to mitigate negative perspectives on wind power.

  11. Stakeholder acceptance analysis: Tunable hybrid plasma

    SciTech Connect

    Peterson, T.

    1995-12-01

    This report resents evaluations, recommendations, and requirements concerning Tunable Hybrid Plasma (THP) derived from a three-year program of stake holder involvement. THP destroys volatile organic compounds by directing a moderate energy electron beam into a flow of air containing organic contaminants. This report is for technology developers and for those responsible for making decisions about the use of technology to remediate contamination by volatile organic compounds. Stakeholders` perspectives help those responsible for technology deployment make good decisions concerning the acceptability and applicability of THP to the remediation problems the face. In addition, this report presents data requirements for the technology`s field demonstration defined by stakeholders associated with the Hanford site in Washington State, as well as detailed comments on THP from stakeholders from four other sites throughout the western United States.

  12. 10 CFR 50.46a - Acceptance criteria for reactor coolant system venting systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptance criteria for reactor coolant system venting systems. 50.46a Section 50.46a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Standards for Licenses, Certifications, and Regulatory Approvals § 50.46a Acceptance criteria for reactor coolant...

  13. 10 CFR 26.111 - Checking the acceptability of the urine specimen.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Checking the acceptability of the urine specimen. 26.111 Section 26.111 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.111 Checking the acceptability of the urine specimen. (a) Immediately after the...

  14. 10 CFR 26.111 - Checking the acceptability of the urine specimen.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Checking the acceptability of the urine specimen. 26.111 Section 26.111 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.111 Checking the acceptability of the urine specimen. (a) Immediately after the...

  15. 10 CFR 26.111 - Checking the acceptability of the urine specimen.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Checking the acceptability of the urine specimen. 26.111 Section 26.111 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.111 Checking the acceptability of the urine specimen. (a) Immediately after the...

  16. 10 CFR 26.111 - Checking the acceptability of the urine specimen.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Checking the acceptability of the urine specimen. 26.111 Section 26.111 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.111 Checking the acceptability of the urine specimen. (a) Immediately after the...

  17. 10 CFR 26.111 - Checking the acceptability of the urine specimen.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Checking the acceptability of the urine specimen. 26.111 Section 26.111 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.111 Checking the acceptability of the urine specimen. (a) Immediately after the...

  18. 48 CFR 811.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Market acceptance. 811.103 Section 811.103 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND... acceptance....

  19. 48 CFR 811.103 - Market acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Market acceptance. 811.103 Section 811.103 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND... acceptance....

  20. Computer acceptance of older adults.

    PubMed

    Nägle, Sibylle; Schmidt, Ludger

    2012-01-01

    Even though computers play a massive role in everyday life of modern societies, older adults, and especially older women, are less likely to use a computer, and they perform fewer activities on it than younger adults. To get a better understanding of the factors affecting older adults' intention towards and usage of computers, the Unified Theory of Acceptance and Usage of Technology (UTAUT) was applied as part of a more extensive study with 52 users and non-users of computers, ranging in age from 50 to 90 years. The model covers various aspects of computer usage in old age via four key constructs, namely performance expectancy, effort expectancy, social influences, and facilitating conditions, as well as the variables gender, age, experience, and voluntariness it. Interestingly, next to performance expectancy, facilitating conditions showed the strongest correlation with use as well as with intention. Effort expectancy showed no significant correlation with the intention of older adults to use a computer. PMID:22317258

  1. 30 CFR 285.224 - What happens if MMS accepts my bid?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Issuance of OCS Renewable Energy Leases Competitive Lease Award Process § 285.224 What happens if MMS accepts my bid? If...

  2. 76 FR 1613 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 4,...

  3. 76 FR 6459 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted.... On December 30, 2010, Mahoning Hydropower, LLC filed an application for a preliminary...

  4. 76 FR 7838 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted.... On December 30, 2010, Mahoning Hydropower, LLC filed an application for a preliminary...

  5. 75 FR 8320 - Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted.... On November 5, 2009, Coastal Hydropower LLC filed an application for a preliminary permit,...

  6. 76 FR 67179 - Spartanburg Water System; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Spartanburg Water System; Notice of Preliminary Permit Application Accepted..., Spartanburg Water System (Spartanburg) filed an application for a preliminary permit, pursuant to section...

  7. 77 FR 16220 - Spartanburg Water System; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Spartanburg Water System; Notice of Preliminary Permit Application Accepted..., 2011, Spartanburg Water System (Spartanburg) filed an application for a preliminary permit, pursuant...

  8. 75 FR 12533 - The Power Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission The Power Company, Inc.; Notice of Preliminary Permit Application Accepted... Power Act, proposing to study the feasibility of the Damariscotta River Hydrokinetic Tidal...

  9. 7 CFR 966.29 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 966.29 Section 966.29 Agriculture... Regulating Handling Committee § 966.29 Acceptance. Any person selected as a committee member or alternate shall qualify by filing a written acceptance with the Secretary within ten days after being notified...

  10. 7 CFR 924.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 924.25 Section 924.25 Agriculture....25 Acceptance. Any person selected by the Secretary as a member or as an alternate member of the committee shall qualify by filing a written acceptance with the Secretary promptly after being notified...

  11. 7 CFR 924.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 924.25 Section 924.25 Agriculture....25 Acceptance. Any person selected by the Secretary as a member or as an alternate member of the committee shall qualify by filing a written acceptance with the Secretary promptly after being notified...

  12. 7 CFR 923.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 923.25 Section 923.25 Agriculture... COUNTIES IN WASHINGTON Order Regulating Handling Administrative Body § 923.25 Acceptance. Any person prior... written acceptance of willingness to serve on the committee....

  13. 7 CFR 993.31 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 993.31 Section 993.31 Agriculture... Order Regulating Handling Prune Marketing Committee § 993.31 Acceptance. Each person selected as a... with the Secretary a written acceptance within 15 days after receiving notice of his selection....

  14. 7 CFR 1215.23 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Acceptance. 1215.23 Section 1215.23 Agriculture... Acceptance. Each individual nominated for membership of the Board shall qualify by filing a written acceptance with the Secretary at the time of nomination....

  15. 7 CFR 906.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 906.25 Section 906.25 Agriculture... RIO GRANDE VALLEY IN TEXAS Order Regulating Handling Committee § 906.25 Acceptance. Any person selected as a committee member or alternate shall qualify by filing a written acceptance with the...

  16. 7 CFR 946.26 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 946.26 Section 946.26 Agriculture... Order Regulating Handling Administrative Committee § 946.26 Acceptance. Any person selected by the Secretary as a committee member or as an alternate shall qualify by filing a written acceptance with...

  17. 7 CFR 959.29 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 959.29 Section 959.29 Agriculture... Regulating Handling Committee § 959.29 Acceptance. Any person selected as a committee member or alternate shall qualify by filing a written acceptance within ten days after being notified of such selection....

  18. 12 CFR 250.164 - Bankers' acceptances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Bankers' acceptances. 250.164 Section 250.164... MISCELLANEOUS INTERPRETATIONS Interpretations § 250.164 Bankers' acceptances. (a) Section 207 of the Bank Export... bankers' acceptances (“BAs”) that may be created by an individual member bank from 50 per cent (or 100...

  19. 24 CFR 3282.355 - Submission acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Submission acceptance. 3282.355... § 3282.355 Submission acceptance. (a) A party whose submission is determined by the Department to be adequate shall be granted provisional acceptance until December 15, 1976, or for a six month period...

  20. 7 CFR 906.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 906.25 Section 906.25 Agriculture... RIO GRANDE VALLEY IN TEXAS Order Regulating Handling Committee § 906.25 Acceptance. Any person selected as a committee member or alternate shall qualify by filing a written acceptance with the...

  1. 24 CFR 3282.355 - Submission acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Submission acceptance. 3282.355... § 3282.355 Submission acceptance. (a) A party whose submission is determined by the Department to be adequate shall be granted provisional acceptance until December 15, 1976, or for a six month period...

  2. 48 CFR 11.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Market acceptance. 11.103... DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 11.103 Market acceptance. (a) Section... either— (i) Achieved commercial market acceptance; or (ii) Been satisfactorily supplied to an...

  3. 7 CFR 1250.330 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Acceptance. 1250.330 Section 1250.330 Agriculture... Research and Promotion Order Egg Board § 1250.330 Acceptance. Any person appointed by the Secretary as a member, or as an alternate member, of the Board shall qualify by filing a written acceptance with...

  4. 7 CFR 923.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 923.25 Section 923.25 Agriculture... COUNTIES IN WASHINGTON Order Regulating Handling Administrative Body § 923.25 Acceptance. Any person prior... written acceptance of willingness to serve on the committee....

  5. 7 CFR 1205.326 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Acceptance. 1205.326 Section 1205.326 Agriculture... Research and Promotion Order Cotton Board § 1205.326 Acceptance. Any person selected by the Secretary as a member or as an alternate member of the Board shall qualify by filing a written acceptance with...

  6. 7 CFR 953.21 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 953.21 Section 953.21 Agriculture... STATES Order Regulating Handling Administrative Committee § 953.21 Acceptance. Any person selected by the... acceptance with the Secretary within the time specified by the Secretary....

  7. 12 CFR 250.164 - Bankers' acceptances.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 3 2011-01-01 2011-01-01 false Bankers' acceptances. 250.164 Section 250.164... MISCELLANEOUS INTERPRETATIONS Interpretations § 250.164 Bankers' acceptances. (a) Section 207 of the Bank Export... bankers' acceptances (“BAs”) that may be created by an individual member bank from 50 per cent (or 100...

  8. 7 CFR 966.29 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 966.29 Section 966.29 Agriculture... Regulating Handling Committee § 966.29 Acceptance. Any person selected as a committee member or alternate shall qualify by filing a written acceptance with the Secretary within ten days after being notified...

  9. 48 CFR 2911.103 - Market acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Market acceptance. 2911... DESCRIBING AGENCY NEEDS Selecting And Developing Requirements Documents 2911.103 Market acceptance. The... offered have either achieved commercial market acceptance or been satisfactorily supplied to an...

  10. 7 CFR 1215.23 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Acceptance. 1215.23 Section 1215.23 Agriculture... Acceptance. Each individual nominated for membership of the Board shall qualify by filing a written acceptance with the Secretary at the time of nomination....

  11. 7 CFR 946.26 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 946.26 Section 946.26 Agriculture... Order Regulating Handling Administrative Committee § 946.26 Acceptance. Any person selected by the Secretary as a committee member or as an alternate shall qualify by filing a written acceptance with...

  12. 7 CFR 1205.326 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Acceptance. 1205.326 Section 1205.326 Agriculture... Research and Promotion Order Cotton Board § 1205.326 Acceptance. Any person selected by the Secretary as a member or as an alternate member of the Board shall qualify by filing a written acceptance with...

  13. 7 CFR 953.21 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 953.21 Section 953.21 Agriculture... STATES Order Regulating Handling Administrative Committee § 953.21 Acceptance. Any person selected by the... acceptance with the Secretary within the time specified by the Secretary....

  14. 7 CFR 1250.330 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Acceptance. 1250.330 Section 1250.330 Agriculture... Research and Promotion Order Egg Board § 1250.330 Acceptance. Any person appointed by the Secretary as a member, or as an alternate member, of the Board shall qualify by filing a written acceptance with...

  15. 48 CFR 2911.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Market acceptance. 2911... DESCRIBING AGENCY NEEDS Selecting And Developing Requirements Documents 2911.103 Market acceptance. The... offered have either achieved commercial market acceptance or been satisfactorily supplied to an...

  16. 48 CFR 11.103 - Market acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Market acceptance. 11.103... DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 11.103 Market acceptance. (a) Section... either— (i) Achieved commercial market acceptance; or (ii) Been satisfactorily supplied to an...

  17. 7 CFR 1210.323 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Acceptance. 1210.323 Section 1210.323 Agriculture... PLAN Watermelon Research and Promotion Plan National Watermelon Promotion Board § 1210.323 Acceptance. Each person nominated for membership on the Board shall qualify by filing a written acceptance with...

  18. 7 CFR 959.29 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 959.29 Section 959.29 Agriculture... Regulating Handling Committee § 959.29 Acceptance. Any person selected as a committee member or alternate shall qualify by filing a written acceptance within ten days after being notified of such selection....

  19. 7 CFR 993.31 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 993.31 Section 993.31 Agriculture... Order Regulating Handling Prune Marketing Committee § 993.31 Acceptance. Each person selected as a... with the Secretary a written acceptance within 15 days after receiving notice of his selection....

  20. 7 CFR 915.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 915.25 Section 915.25 Agriculture... Regulating Handling Administrative Body § 915.25 Acceptance. Any person selected by the Secretary as a member or as an alternate member of the committee shall qualify by filing a written acceptance with...

  1. 7 CFR 1210.323 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Acceptance. 1210.323 Section 1210.323 Agriculture... PLAN Watermelon Research and Promotion Plan National Watermelon Promotion Board § 1210.323 Acceptance. Each person nominated for membership on the Board shall qualify by filing a written acceptance with...

  2. 46 CFR 28.73 - Accepted organizations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Accepted organizations. 28.73 Section 28.73 Shipping... INDUSTRY VESSELS General Provisions § 28.73 Accepted organizations. An organization desiring to be designated by the Commandant as an accepted organization must request such designation in writing. As...

  3. Older Adults' Acceptance of Information Technology

    ERIC Educational Resources Information Center

    Wang, Lin; Rau, Pei-Luen Patrick; Salvendy, Gavriel

    2011-01-01

    This study investigated variables contributing to older adults' information technology acceptance through a survey, which was used to find factors explaining and predicting older adults' information technology acceptance behaviors. Four factors, including needs satisfaction, perceived usability, support availability, and public acceptance, were…

  4. 48 CFR 11.103 - Market acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Market acceptance. 11.103... DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 11.103 Market acceptance. (a) Section... either— (i) Achieved commercial market acceptance; or (ii) Been satisfactorily supplied to an...

  5. 48 CFR 11.103 - Market acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Market acceptance. 11.103... DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 11.103 Market acceptance. (a) 41 U.S...) Achieved commercial market acceptance; or (ii) Been satisfactorily supplied to an agency under current...

  6. 48 CFR 2911.103 - Market acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Market acceptance. 2911... DESCRIBING AGENCY NEEDS Selecting And Developing Requirements Documents 2911.103 Market acceptance. The... offered have either achieved commercial market acceptance or been satisfactorily supplied to an...

  7. 48 CFR 11.103 - Market acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Market acceptance. 11.103... DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 11.103 Market acceptance. (a) Section... either— (i) Achieved commercial market acceptance; or (ii) Been satisfactorily supplied to an...

  8. 48 CFR 2911.103 - Market acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Market acceptance. 2911.103... DESCRIBING AGENCY NEEDS Selecting And Developing Requirements Documents 2911.103 Market acceptance. The... offered have either achieved commercial market acceptance or been satisfactorily supplied to an...

  9. 48 CFR 2911.103 - Market acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Market acceptance. 2911... DESCRIBING AGENCY NEEDS Selecting And Developing Requirements Documents 2911.103 Market acceptance. The... offered have either achieved commercial market acceptance or been satisfactorily supplied to an...

  10. The Relationship between Treatment Acceptability and Familism

    ERIC Educational Resources Information Center

    Pemberton, Joy R.; Borrego, Joaquin, Jr.

    2005-01-01

    Many studies have examined the acceptability of treatments for children with disruptive behaviors. However, few studies to date have tested the effects of home environment variables such as family support on treatment acceptability. In the current study, parents' level of familism was used to predict their willingness to accept several behavioral…

  11. 46 CFR 28.73 - Accepted organizations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Accepted organizations. 28.73 Section 28.73 Shipping... INDUSTRY VESSELS General Provisions § 28.73 Accepted organizations. An organization desiring to be designated by the Commandant as an accepted organization must request such designation in writing. As...

  12. 40 CFR 600.007-08 - Vehicle acceptability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Vehicle acceptability. 600.007-08 Section 600.007-08 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY AND CARBON-RELATED EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy Regulations for 1977 and Later Model Year...

  13. 40 CFR 600.007-80 - Vehicle acceptability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Vehicle acceptability. 600.007-80 Section 600.007-80 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY AND CARBON-RELATED EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy Regulations for 1977 and Later Model Year...

  14. The Acceptance Strategy for Nuclear Power Plant In Indonesia

    NASA Astrophysics Data System (ADS)

    Suhaemi, Tjipta; Syaukat, Achmad

    2010-06-01

    THE ACCEPTANCE STRATEGY FOR NUCLEAR POWER PLANT IN INDONESIA. Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with international politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R&D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.

  15. An investigation of the acceptance of solar heating and cooling in the housing industry in New Mexico

    NASA Technical Reports Server (NTRS)

    Lundahl, C. R.; Scott, J. C.; Dennis, D. M.

    1976-01-01

    A data base of information relating to the acceptability of solar-energy technology in the New Mexican housing industry was developed. Topics examined include: (1) the factors which influence the adoption of solar-energy systems in the New Mexican housing industry; (2) the degree of acceptability of various solar factors among New Mexican consumers, architects, contractors, financiers, energy suppliers, and governmental officials; and (3) the current attitudes toward the acceptability of solar energy factors in the New Mexican housing industry.

  16. First Results from The MAGNEX Large Acceptance Spectrometer

    SciTech Connect

    Cunsolo, A.; Cappuzzello, F.; Cavallaro, M.; Orrigo, S. E. A.; Carbone, D.; Schillaci, C.; Foti, A.; Borello-Lewin, T.; Rodrigues, M. R. D.; Petrascu, H.; Winfield, J. S.

    2008-11-11

    The MAGNEX large-acceptance spectrometer was commissioned with beams from the LNS Tandem. First results of physical interest are presented. The obtained 10{sup -3} energy resolution confirms the ambitious characteristic of the calculations and allows considering the instrument as an ideal tool for future studies in the field of nuclear spectroscopy and reaction mechanisms at incident energies not far form the Coulomb barrier.

  17. 10 CFR 217.33 - Acceptance and rejection of rated orders.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... directed by the Department of Energy for a rated order involving all forms of energy: (1) A person shall... directed by the Department of Energy for a rated order involving all forms of energy, rated orders may be... 10 Energy 3 2014-01-01 2014-01-01 false Acceptance and rejection of rated orders. 217.33...

  18. Acceptability of GM foods among Pakistani consumers.

    PubMed

    Ali, Akhter; Rahut, Dil Bahadur; Imtiaz, Muhammad

    2016-04-01

    In Pakistan majority of the consumers do not have information about genetically modified (GM) foods. In developing countries particularly in Pakistan few studies have focused on consumers' acceptability about GM foods. Using comprehensive primary dataset collected from 320 consumers in 2013 from Pakistan, this study analyzes the determinants of consumers' acceptability of GM foods. The data was analyzed by employing the bivariate probit model and censored least absolute deviation (CLAD) models. The empirical results indicated that urban consumers are more aware of GM foods compared to rural consumers. The acceptance of GM foods was more among females' consumers as compared to male consumers. In addition, the older consumers were more willing to accept GM food compared to young consumers. The acceptability of GM foods was also higher among wealthier households. Low price is the key factor leading to the acceptability of GM foods. The acceptability of the GM foods also reduces the risks among Pakistani consumers. PMID:27494790

  19. Acceptance test report MICON software exhaust fan control

    SciTech Connect

    Keck, R.D.

    1998-06-12

    This test procedure specifies instructions for acceptance testing of software for exhaust fan control under Project ESPT (Energy Savings Performance Contract). The software controls the operation of two emergency exhaust fans when there is a power failure. This report details the results of acceptance testing for the MICON software upgrades. One of the modifications is that only one of the emergency fans will operate at all times. If the operating fan shuts off or fails, the other fan will start and the operating fan will be stopped.

  20. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA, JUNE 2006

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2006-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  1. Nuclear safety technology and public acceptance

    NASA Astrophysics Data System (ADS)

    Kienle, F.

    1985-11-01

    In the years 1976 to 1982 officialdom intensified the safety regulations in German nuclear power plants out of all proportion, without actually bringing about a recognizable plus in safety or indeed a greater acceptance by the public of the peaceful use of nuclear energy. Although the risk to employees of nuclear power plants and to the population living in their vicinity is substantially smaller than the dangers of modern civilization, the general public still regards with concern the consequences of radioactive exposure and the hazards to later generations from long-life radionuclides. The task for the coming years must be to maintain the safety standard now attained, while simultaneously reducing those exaggerated individual requirements in order to establish a balance in safety precautions. Additionally, a proposal put forward by Sir Walter Marshall, Chairman of the CEGB, should be pursued, i.e., to put the presumed risks of nuclear energy into their correct perspective in the public eye using comprehensible comparisons such as the risks from active or passive smoking. This cannot be accomplished by quoting abstract statistics.

  2. The social acceptance of artificial photosynthesis: towards a conceptual framework

    PubMed Central

    Sovacool, Benjamin K.; Gross, Allan

    2015-01-01

    Advancements in artificial photosynthesis have the potential to radically transform how societies convert and use energy. Their successful development, however, hinges not only on technical breakthroughs, but also acceptance and adoption by energy users. This article introduces a conceptual framework enabling analysts, planners and even investors to determine environments where artificial photosynthesis may thrive, and those where it may struggle. Drawn from work looking at the barriers and acceptance of solar photovoltaic and wind energy systems, the article proposes that social acceptance has multiple dimensions—socio-political, community and market—that must be met holistically in order for investors and users to embrace new technologies. The article argues that any future market acceptance for artificial photosynthesis will depend upon the prevalence of nine factors, which create conducive environments; the lack of the conditions engenders environments where they will likely be rejected. The conditions are (i) strong institutional capacity; (ii) political commitment; (iii) favourable legal and regulatory frameworks; (iv) competitive installation and/or production costs; (v) mechanisms for information and feedback; (vi) access to financing; (vii) prolific community and/or individual ownership and use; (viii) participatory project siting; and (ix) recognition of externalities or positive public image. PMID:26052424

  3. The social acceptance of artificial photosynthesis: towards a conceptual framework.

    PubMed

    Sovacool, Benjamin K; Gross, Allan

    2015-06-01

    Advancements in artificial photosynthesis have the potential to radically transform how societies convert and use energy. Their successful development, however, hinges not only on technical breakthroughs, but also acceptance and adoption by energy users. This article introduces a conceptual framework enabling analysts, planners and even investors to determine environments where artificial photosynthesis may thrive, and those where it may struggle. Drawn from work looking at the barriers and acceptance of solar photovoltaic and wind energy systems, the article proposes that social acceptance has multiple dimensions-socio-political, community and market-that must be met holistically in order for investors and users to embrace new technologies. The article argues that any future market acceptance for artificial photosynthesis will depend upon the prevalence of nine factors, which create conducive environments; the lack of the conditions engenders environments where they will likely be rejected. The conditions are (i) strong institutional capacity; (ii) political commitment; (iii) favourable legal and regulatory frameworks; (iv) competitive installation and/or production costs; (v) mechanisms for information and feedback; (vi) access to financing; (vii) prolific community and/or individual ownership and use; (viii) participatory project siting; and (ix) recognition of externalities or positive public image. PMID:26052424

  4. Acceptance in Romantic Relationships: The Frequency and Acceptability of Partner Behavior Inventory

    ERIC Educational Resources Information Center

    Doss, Brian D.; Christensen, Andrew

    2006-01-01

    Despite the recent emphasis on acceptance in romantic relationships, no validated measure of relationship acceptance presently exists. To fill this gap, the 20-item Frequency and Acceptability of Partner Behavior Inventory (FAPBI; A. Christensen & N. S. Jacobson, 1997) was created to assess separately the acceptability and frequency of both…

  5. 2013 SYR Accepted Poster Abstracts.

    PubMed

    2013-01-01

    SYR 2013 Accepted Poster abstracts: 1. Benefits of Yoga as a Wellness Practice in a Veterans Affairs (VA) Health Care Setting: If You Build It, Will They Come? 2. Yoga-based Psychotherapy Group With Urban Youth Exposed to Trauma. 3. Embodied Health: The Effects of a Mind�Body Course for Medical Students. 4. Interoceptive Awareness and Vegetable Intake After a Yoga and Stress Management Intervention. 5. Yoga Reduces Performance Anxiety in Adolescent Musicians. 6. Designing and Implementing a Therapeutic Yoga Program for Older Women With Knee Osteoarthritis. 7. Yoga and Life Skills Eating Disorder Prevention Among 5th Grade Females: A Controlled Trial. 8. A Randomized, Controlled Trial Comparing the Impact of Yoga and Physical Education on the Emotional and Behavioral Functioning of Middle School Children. 9. Feasibility of a Multisite, Community based Randomized Study of Yoga and Wellness Education for Women With Breast Cancer Undergoing Chemotherapy. 10. A Delphi Study for the Development of Protocol Guidelines for Yoga Interventions in Mental Health. 11. Impact Investigation of Breathwalk Daily Practice: Canada�India Collaborative Study. 12. Yoga Improves Distress, Fatigue, and Insomnia in Older Veteran Cancer Survivors: Results of a Pilot Study. 13. Assessment of Kundalini Mantra and Meditation as an Adjunctive Treatment With Mental Health Consumers. 14. Kundalini Yoga Therapy Versus Cognitive Behavior Therapy for Generalized Anxiety Disorder and Co-Occurring Mood Disorder. 15. Baseline Differences in Women Versus Men Initiating Yoga Programs to Aid Smoking Cessation: Quitting in Balance Versus QuitStrong. 16. Pranayam Practice: Impact on Focus and Everyday Life of Work and Relationships. 17. Participation in a Tailored Yoga Program is Associated With Improved Physical Health in Persons With Arthritis. 18. Effects of Yoga on Blood Pressure: Systematic Review and Meta-analysis. 19. A Quasi-experimental Trial of a Yoga based Intervention to Reduce Stress and

  6. The DWPF strategy for producing an acceptable product

    SciTech Connect

    Goldston, W.T.; Plodinec, M.J.

    1991-12-31

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) will convert the 130 million liters of high-level nuclear waste at SRS into stable borosilicate glass. Production of canistered waste forms by the DWPF is scheduled to begin well before submission of the license application for the first repository. The Department of Energy has defined waste acceptance specifications to ensure that DWPF canistered waste forms will be acceptable for eventual disposal. To ensure that canistered waste forms meet those specifications, a program is being carried out to qualify the waste form and those aspects of the production process which affect product quality. This program includes: Pre-production qualification testing of simulated and actual waste forms; Disciplined demonstrations of the ability to produce an acceptable product during startup testing; and Application of a rigorous product control program during production.

  7. The DWPF strategy for producing an acceptable product

    SciTech Connect

    Goldston, W.T.; Plodinec, M.J.

    1991-01-01

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) will convert the 130 million liters of high-level nuclear waste at SRS into stable borosilicate glass. Production of canistered waste forms by the DWPF is scheduled to begin well before submission of the license application for the first repository. The Department of Energy has defined waste acceptance specifications to ensure that DWPF canistered waste forms will be acceptable for eventual disposal. To ensure that canistered waste forms meet those specifications, a program is being carried out to qualify the waste form and those aspects of the production process which affect product quality. This program includes: Pre-production qualification testing of simulated and actual waste forms; Disciplined demonstrations of the ability to produce an acceptable product during startup testing; and Application of a rigorous product control program during production.

  8. 7 CFR 932.32 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE OLIVES GROWN IN CALIFORNIA Order Regulating Handling Olive Administrative Committee § 932.32 Acceptance. Any person selected by the...

  9. 7 CFR 932.32 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE OLIVES GROWN IN CALIFORNIA Order Regulating Handling Olive Administrative Committee § 932.32 Acceptance. Any person selected by the...

  10. 7 CFR 932.32 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE OLIVES GROWN IN CALIFORNIA Order Regulating Handling Olive Administrative Committee § 932.32 Acceptance. Any person selected by the...

  11. 7 CFR 1207.323 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan National Potato Promotion Board § 1207.323 Acceptance. Each...

  12. 7 CFR 1207.323 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan National Potato Promotion Board § 1207.323 Acceptance. Each...

  13. 7 CFR 1207.323 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan National Potato Promotion Board § 1207.323 Acceptance. Each...

  14. 7 CFR 1207.323 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan National Potato Promotion Board § 1207.323 Acceptance. Each...

  15. 7 CFR 1207.323 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan National Potato Promotion Board § 1207.323 Acceptance. Each...

  16. In acceptance we trust? Conceptualising acceptance as a viable approach to NGO security management.

    PubMed

    Fast, Larissa A; Freeman, C Faith; O'Neill, Michael; Rowley, Elizabeth

    2013-04-01

    This paper documents current understanding of acceptance as a security management approach and explores issues and challenges non-governmental organisations (NGOs) confront when implementing an acceptance approach to security management. It argues that the failure of organisations to systematise and clearly articulate acceptance as a distinct security management approach and a lack of organisational policies and procedures concerning acceptance hinder its efficacy as a security management approach. The paper identifies key and cross-cutting components of acceptance that are critical to its effective implementation in order to advance a comprehensive and systematic concept of acceptance. The key components of acceptance illustrate how organisational and staff functions affect positively or negatively an organisation's acceptance, and include: an organisation's principles and mission, communications, negotiation, programming, relationships and networks, stakeholder and context analysis, staffing, and image. The paper contends that acceptance is linked not only to good programming, but also to overall organisational management and structures. PMID:23278470

  17. Performance-based waste acceptance criteria preliminary baseline assumptions

    SciTech Connect

    Not Available

    1994-10-24

    The Department of Energy`s (DOE`s) strategy for the management of transuranic (TRU) and TRU mixed wastes has focused on the development of the Waste Isolation Pilot Plant (WIPP). The WIPP repository is designated to receive DOE defense wastes that meet the established criteria for acceptance. As a national strategy [DOE, 1993], DOE does not intend to treat candidate wastes unless treatment or processing are necessary to meet the safety, health, and regulatory criteria for transport and disposal at WIPP. The WIPP WAC has evolved over the past 10 years to include criteria and requirements in support of the Waste Characterization program and other related compliance programs. In aggregate, the final health, safety and regulatory criteria for the waste will be documented in the Disposal WAC. This document serves two purposes. First, it familiarizes regulators and stakeholders with the concept of performance based waste acceptance criteria as an augmentation within a final Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria. Second, the document preliminarily identifies certain waste characteristics that appear important to the performance assessment process for WIPP; therefore, these could become component characteristics in the Performance Based Waste Acceptance Criteria (PBWAC). Identification of the final PBWAC will be accomplished through iterative runs of the System Prioritization Method (SPM). These iterations will serve to more clearly isolate and identify those waste characteristics that directly and predominately impact on the performance assessment.

  18. Affective imagery and acceptance of replacing nuclear power plants.

    PubMed

    Keller, Carmen; Visschers, Vivianne; Siegrist, Michael

    2012-03-01

    This study examined the relationship between the content of spontaneous associations with nuclear power plants and the acceptance of using new-generation nuclear power plants to replace old ones. The study also considered gender as a variable. A representative sample of the German- and French-speaking population of Switzerland (N= 1,221) was used. Log-linear models revealed significant two-way interactions between the association content and acceptance, association content and gender, and gender and acceptance. Correspondence analysis revealed that participants who were opposed to nuclear power plants mainly associated nuclear power plants with risk, negative feelings, accidents, radioactivity, waste disposal, military use, and negative consequences for health and environment; whereas participants favoring nuclear power plants mainly associated them with energy, appearance descriptions of nuclear power plants, and necessity. Thus, individuals opposing nuclear power plants had both more concrete and more diverse associations with them than people who were in favor of nuclear power plants. In addition, participants who were undecided often mentioned similar associations to those participants who were in favor. Males more often expressed associations with energy, waste disposal, and negative health effects. Females more often made associations with appearance descriptions, negative feelings, and negative environmental effects. The results further suggest that acceptance of replacing nuclear power plants was higher in the German-speaking part of the country, where all of the Swiss nuclear power plants are physically located. Practical implications for risk communication are discussed. PMID:21977961

  19. Proposals accepted by the CEC

    SciTech Connect

    Not Available

    1987-06-01

    Descriptions are given of 12 geothermal projects approved by the California Energy Commission (CEC) for inclusion on the 1988-89 state budget. Projects include an aquaculture facility for mosquistofish to be used instead of toxic chemicals to control mosquitoes, an air monitoring program at The Geysers, a water quality baseline study for the Pieta Creek Basin within The Geysers KGRA, expansion of an existing geothermal district heating system, resource assessment and exploratory drilling on the Santa Ysabel Indian Reservation, and modifications and retrofit of space and water heating systems at two hospitals.

  20. 48 CFR 3011.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Market acceptance. 3011.103 Section 3011.103 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND... Developing Requirements Documents 3011.103 Market acceptance. (a) Contracting officers may act on behalf...

  1. 7 CFR 930.26 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 930.26 Section 930.26 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... Administrative Body § 930.26 Acceptance. Each person to be appointed by the Secretary as a member or as...

  2. 48 CFR 2811.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Market acceptance. 2811.103 Section 2811.103 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND... acceptance. Pursuant to FAR 11.103, the HCA or designee at a level not lower than the BPC has the...

  3. 48 CFR 1311.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Market acceptance. 1311.103 Section 1311.103 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND... acceptance. The designee authorized as the head of the agency is set forth in CAM 1301.70....

  4. 36 CFR 251.62 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Acceptance. 251.62 Section 251.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE LAND USES Special Uses § 251.62 Acceptance. Except for an easement, a special use authorization shall become...

  5. 48 CFR 3011.103 - Market acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Market acceptance. 3011.103 Section 3011.103 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND... Developing Requirements Documents 3011.103 Market acceptance. (a) Contracting officers may act on behalf...

  6. 48 CFR 1011.103 - Market Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Market Acceptance. 1011.103 Section 1011.103 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY COMPETITION AND... Acceptance. (a) BCPOs can act on behalf of the head of the agency in this subpart only. BCPOs,...

  7. 7 CFR 916.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 916.25 Section 916.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... Regulating Handling Administrative Body § 916.25 Acceptance. Each person to be selected by the Secretary as...

  8. 43 CFR 3452.1-3 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Acceptance. 3452.1-3 Section 3452.1-3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT..., Cancellation, and Termination § 3452.1-3 Acceptance. The effective date of the lease relinquishment shall,...

  9. 48 CFR 1311.103 - Market acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Market acceptance. 1311.103 Section 1311.103 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND... acceptance. The designee authorized as the head of the agency is set forth in CAM 1301.70....

  10. 7 CFR 916.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 916.25 Section 916.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... Regulating Handling Administrative Body § 916.25 Acceptance. Each person to be selected by the Secretary as...

  11. 7 CFR 920.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 920.25 Section 920.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... Administrative Body § 920.25 Acceptance. Each person to be selected by the Secretary as a member or as...

  12. 5 CFR 1655.11 - Loan acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CFR 1653.3(c); or (f) The participant has received a taxable loan distribution from the TSP within the... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Loan acceptance. 1655.11 Section 1655.11 Administrative Personnel FEDERAL RETIREMENT THRIFT INVESTMENT BOARD LOAN PROGRAM § 1655.11 Loan acceptance....

  13. 7 CFR 930.26 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 930.26 Section 930.26 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... Administrative Body § 930.26 Acceptance. Each person to be appointed by the Secretary as a member or as...

  14. 7 CFR 945.27 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 945.27 Section 945.27 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... § 945.27 Acceptance. Any person nominated to serve on the committee as a member or as an alternate...

  15. 19 CFR 114.21 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Acceptance. 114.21 Section 114.21 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARNETS Processing of Carnets § 114.21 Acceptance. A carnet executed in accordance with § 114.3 shall...

  16. 19 CFR 114.21 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 1 2011-04-01 2011-04-01 false Acceptance. 114.21 Section 114.21 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARNETS Processing of Carnets § 114.21 Acceptance. A carnet executed in accordance with § 114.3 shall...

  17. 7 CFR 920.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 920.25 Section 920.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... Administrative Body § 920.25 Acceptance. Each person to be selected by the Secretary as a member or as...

  18. 7 CFR 932.32 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 932.32 Section 932.32 Agriculture... Regulating Handling Olive Administrative Committee § 932.32 Acceptance. Any person selected by the Secretary as a member or as an alternate member of the committee shall qualify by filing a written...

  19. 5 CFR 1655.11 - Loan acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CFR 1653.3(c); or (f) The participant has received a taxable loan distribution from the TSP within the... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Loan acceptance. 1655.11 Section 1655.11 Administrative Personnel FEDERAL RETIREMENT THRIFT INVESTMENT BOARD LOAN PROGRAM § 1655.11 Loan acceptance....

  20. 48 CFR 411.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Market acceptance. 411.103 Section 411.103 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE COMPETITION AND... acceptance. (a) The head of the contracting activity (HCA) may determine that offerors must demonstrate,...

  1. 7 CFR 989.32 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 989.32 Section 989.32 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... CALIFORNIA Order Regulating Handling Raisin Administrative Committee § 989.32 Acceptance. Each person to...

  2. 7 CFR 932.32 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 932.32 Section 932.32 Agriculture... Regulating Handling Olive Administrative Committee § 932.32 Acceptance. Any person selected by the Secretary as a member or as an alternate member of the committee shall qualify by filing a written...

  3. 7 CFR 945.27 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 945.27 Section 945.27 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... § 945.27 Acceptance. Any person nominated to serve on the committee as a member or as an alternate...

  4. 48 CFR 411.103 - Market acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Market acceptance. 411.103 Section 411.103 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE COMPETITION AND... acceptance. (a) The head of the contracting activity (HCA) may determine that offerors must demonstrate,...

  5. 36 CFR 251.62 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Acceptance. 251.62 Section 251.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE LAND USES Special Uses § 251.62 Acceptance. Except for an easement, a special use authorization shall become...

  6. 49 CFR 193.2303 - Construction acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Construction acceptance. 193.2303 Section 193.2303 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY...: FEDERAL SAFETY STANDARDS Construction § 193.2303 Construction acceptance. No person may place in...

  7. 49 CFR 193.2303 - Construction acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Construction acceptance. 193.2303 Section 193.2303 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY...: FEDERAL SAFETY STANDARDS Construction § 193.2303 Construction acceptance. No person may place in...

  8. Why Do Women Accept the Rape Myth?

    ERIC Educational Resources Information Center

    Tabone, Christopher; And Others

    The rape myth, defined as prejudicial, stereotyped, or false beliefs about rape, rape victims, and rapists, is accepted by individuals from varied walks of life, including women. It has been suggested that rape myth acceptance (RMA) among women serves a protective function by enabling women to dissociate themselves from a rape victim's experience.…

  9. Heavy Metal, Religiosity, and Suicide Acceptability.

    ERIC Educational Resources Information Center

    Stack, Steven

    1998-01-01

    Reports on data taken from the General Social Survey that found a link between "heavy metal" rock fanship and suicide acceptability. Finds that relationship becomes nonsignificant once level of religiosity is controlled. Heavy metal fans are low in religiosity, which contributes to greater suicide acceptability. (Author/JDM)

  10. 48 CFR 411.103 - Market acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Market acceptance. 411.103... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 411.103 Market... accordance with FAR 11.103(a), the market acceptability of their items to be offered. (b) The...

  11. 48 CFR 411.103 - Market acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Market acceptance. 411.103... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 411.103 Market... accordance with FAR 11.103(a), the market acceptability of their items to be offered. (b) The...

  12. 48 CFR 3011.103 - Market acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Market acceptance. 3011.103 Section 3011.103 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY... Requirements Documents 3011.103 Market acceptance. (a) Contracting officers may act on behalf of the head...

  13. 48 CFR 411.103 - Market acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Market acceptance. 411.103... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 411.103 Market... accordance with FAR 11.103(a), the market acceptability of their items to be offered. (b) The...

  14. 48 CFR 3011.103 - Market acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Market acceptance. 3011.103 Section 3011.103 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND... Developing Requirements Documents 3011.103 Market acceptance. (a) Contracting officers may act on behalf...

  15. 48 CFR 3011.103 - Market acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Market acceptance. 3011.103 Section 3011.103 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND... Developing Requirements Documents 3011.103 Market acceptance. (a) Contracting officers may act on behalf...

  16. Four therapeutic diets: adherence and acceptability.

    PubMed

    Berkow, Susan E; Barnard, Neal; Eckart, Jill; Katcher, Heather

    2010-01-01

    Many health conditions are treated, at least in part, by therapeutic diets. Although the success of any intervention depends on its acceptability to the patient, the acceptability of therapeutic diets and factors that influence it have been largely neglected in nutrition research. A working definition of acceptability is proposed and an examination and summary are provided of available data on the acceptability of common diet regimens used for medical conditions. The goal is to suggest ways to improve the success of therapeutic diets. The proposed working definition of "acceptability" refers to the user's judgment of the advantages and disadvantages of a therapeutic diet-in relation to palatability, costs, and effects on eating behaviour and health-that influence the likelihood of adherence. Very low-calorie, reduced-fat omnivorous, vegetarian and vegan, and low-carbohydrate diets all achieve acceptability among the majority of users in studies of up to one year, in terms of attrition and adherence rates and results of questionnaires assessing eating behaviours. Longer studies are fewer, but they suggest that vegetarian, vegan, and reduced-fat diets are acceptable, as indicated by sustained changes in nutrient intake. Few studies of this length have been published for very low-calorie or low-carbohydrate diets. Long-term studies of adherence and acceptability of these and other therapeutic diets are warranted. PMID:21144137

  17. Improving Acceptance of Automated Counseling Procedures.

    ERIC Educational Resources Information Center

    Johnson, James H.; And Others

    This paper discusses factors that may influence the acceptance of automated counseling procedures by the military. A consensual model of the change process is presented which structures organizational readiness, the change strategy, and acceptance as integrated variables to be considered in a successful installation. A basic introduction to the…

  18. Enzyme Reactions and Acceptability of Plant Foods.

    ERIC Educational Resources Information Center

    Palmer, James K.

    1984-01-01

    Provides an overview of enzyme reactions which contribute to the character and acceptability of plant foods. A detailed discussion of polyphenoloxidase is also provided as an example of an enzyme which can markedly affect the character and acceptability of such foods. (JN)

  19. 49 CFR 193.2303 - Construction acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: FEDERAL SAFETY STANDARDS Construction § 193.2303 Construction acceptance. No person may place in service... 49 Transportation 3 2010-10-01 2010-10-01 false Construction acceptance. 193.2303 Section 193.2303 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS...

  20. 34 CFR 668.57 - Acceptable documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Acceptable documentation. 668.57 Section 668.57... Application Information § 668.57 Acceptable documentation. (a) Adjusted Gross Income (AGI), income earned from... applicant, the documentation set forth in paragraph (a)(4) of this section if the individual for the...

  1. The acceptability of ending a patient's life

    PubMed Central

    Guedj, M; Gibert, M; Maudet, A; Munoz, S; Mullet, E; Sorum, P

    2005-01-01

    Objectives: To clarify how lay people and health professionals judge the acceptability of ending the life of a terminally ill patient. Design: Participants judged this acceptability in a set of 16 scenarios that combined four factors: the identity of the actor (patient or physician), the patient's statement or not of a desire to have his life ended, the nature of the action as relatively active (injecting a toxin) or passive (disconnecting life support), and the type of suffering (intractable physical pain, complete dependence, or severe psychiatric illness). Participants: 115 lay people and 72 health professionals (22 nurse's aides, 44 nurses, six physicians) in Toulouse, France. Main measurements: Mean acceptability ratings for each scenario for each group. Results: Life ending interventions are more acceptable to lay people than to the health professionals. For both, acceptability is highest for intractable physical suffering; is higher when patients end their own lives than when physicians do so; and, when physicians are the actors, is higher when patients have expressed a desire to die (voluntary euthanasia) than when they have not (involuntary euthanasia). In contrast, when patients perform the action, acceptability for the lay people and nurse's aides does not depend on whether the patient has expressed a desire to die, while for the nurses and physicians unassisted suicide is more acceptable than physician assisted suicide. Conclusions: Lay participants judge the acceptability of life ending actions in largely the same way as do healthcare professionals. PMID:15923476

  2. Consumer acceptance of ginseng food products.

    PubMed

    Chung, Hee Sook; Lee, Young-Chul; Rhee, Young Kyung; Lee, Soo-Yeun

    2011-01-01

    Ginseng has been utilized less in food products than in dietary supplements in the United States. Sensory acceptance of ginseng food products by U.S. consumers has not been reported. The objectives of this study were to: (1) determine the sensory acceptance of commercial ginseng food products and (2) assess influence of the addition of sweeteners to ginseng tea and ginseng extract to chocolate on consumer acceptance. Total of 126 consumers participated in 3 sessions for (1) 7 commercial red ginseng food products, (2) 10 ginseng teas varying in levels of sugar or honey, and (3) 10 ginseng milk or dark chocolates varying in levels of ginseng extract. Ginseng candy with vitamin C and ginseng crunchy white chocolate were the most highly accepted, while sliced ginseng root product was the least accepted among the seven commercial products. Sensory acceptance increased in proportion to the content of sugar and honey in ginseng tea, whereas acceptance decreased with increasing content of ginseng extract in milk and dark chocolates. Findings demonstrate that ginseng food product types with which consumers have been already familiar, such as candy and chocolate, will have potential for success in the U.S. market. Chocolate could be suggested as a food matrix into which ginseng can be incorporated, as containing more bioactive compounds than ginseng tea at a similar acceptance level. Future research may include a descriptive analysis with ginseng-based products to identify the key drivers of liking and disliking for successful new product development. PMID:22416723

  3. A Distributive Model of Treatment Acceptability

    ERIC Educational Resources Information Center

    Carter, Stacy L.

    2008-01-01

    A model of treatment acceptability is proposed that distributes overall treatment acceptability into three separate categories of influence. The categories are comprised of societal influences, consultant influences, and influences associated with consumers of treatments. Each of these categories are defined and their inter-relationships within…

  4. 40 CFR 161.70 - Acceptable protocols.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 25 2012-07-01 2012-07-01 false Acceptable protocols. 161.70 Section 161.70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR REGISTRATION OF ANTIMICROBIAL PESTICIDES General Provisions § 161.70 Acceptable protocols....

  5. 40 CFR 161.70 - Acceptable protocols.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 25 2013-07-01 2013-07-01 false Acceptable protocols. 161.70 Section 161.70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR REGISTRATION OF ANTIMICROBIAL PESTICIDES General Provisions § 161.70 Acceptable protocols....

  6. 10 CFR 2.643 - Acceptance and docketing of application for limited work authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptance and docketing of application for limited work... Construct Certain Utilization Facilities; and Advance Issuance of Limited Work Authorizations Phased Applications Involving Limited Work Authorizations § 2.643 Acceptance and docketing of application for...

  7. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2012-10-01 2012-10-01 false Weld toughness test acceptance criteria....

  8. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2014-10-01 2014-10-01 false Weld toughness test acceptance criteria....

  9. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2013-10-01 2013-10-01 false Weld toughness test acceptance criteria....

  10. The ethical and practical aspects of acceptance and universal patient acceptance.

    PubMed

    Corsino, Bruce V; Patthoff, Donald E

    2006-11-01

    "Acceptance" is an often presupposed, hidden core value and ethic focused on how dental and other health practitioners first accept people as possible patients. The three basic styles of patient acceptance are random, selective, and universal. Reduced public access to care results from the practice of random and selective acceptance. Only universal acceptance creates a potential pathway for improved access to care. The notion of Universal Patient Acceptance (UPA) is discussed here as one kind of applied ethical tool or clinical practice that allows for the ethic of acceptance to be more effectively pursued in daily practice. We suggest that health providers falsely surmise that they already understand and practice Universal Patient Acceptance. That myth and perspective are partly what keeps Acceptance hidden as an ethic and overlooked as a potential way to foster dialogue and indirectly promote better access to care. Without Universal Patient Acceptance, dental and health providers will continue to silently engage in practice patterns that adversely affect public access to care. The actual benefits of Universal Patient Acceptance are the subject of ongoing review and debate. Whatever those benefits might be will not likely be realized until Acceptance and Universal Patient Acceptance are included as part of dental and other health professional codes of ethics and training curricula. That is what we argue for here. PMID:17106034

  11. Procedures and acceptance criteria for PAS-1 cask inspections

    SciTech Connect

    Mercado, J.E.

    1998-09-09

    The procedures and acceptance criteria that comprise this document were prepared to support a one-time test to certify two PAS-1 casks in accordance with US Department of Energy Certificate of Compliance US A/9184/B(U), which was issued in 1998. The specific inspections addressed in this document are the visual weld inspection and a dimensional inspection of the primary containment vessel.

  12. DOE acceptance of commercial mixed waste -- Studies are under way

    SciTech Connect

    Plummer, T.L.; Owens, C.M.

    1993-03-01

    The topic of the Department of Energy acceptance of commercial mixed waste at DOE facilities has been proposed by host States and compact regions that are developing low-level radioactive waste disposal facilities. States support the idea of DOE accepting commercial mixed waste because (a) very little commercial mixed waste is generated compared to generation by DOE facilities (Department of Energy--26,300 cubic meters annually vs. commercial--3400 cubic meters annually); (b) estimated costs for commercial disposal are estimated to be $15,000 to $40,000 per cubic foot; (c) once treatment capability becomes available, 70% of the current levels of commercial mixed waste will be eliminated, (d) some State laws prohibit the development of mixed waste disposal facilities in their States; (e) DOE is developing a nationwide strategy that will include treatment and disposal capacity for its own mixed waste and the incremental burden on the DOE facilities would be minuscule, and (6) no States are developing mixed waste disposal facilities. DOE senior management has repeatedly expressed willingness to consider investigating the feasibility of DOE accepting commercial mixed waste. In January 1991, Leo Duffy of the Department of energy met with members of the Low-Level Radioactive Waste Forum, which led to an agreement to explore such an arrangement. He stated that this seems like a cost-effective way to solve commercial mixed waste management problems.

  13. Public Acceptance for Geological CO2-Storage

    NASA Astrophysics Data System (ADS)

    Schilling, F.; Ossing, F.; Würdemann, H.; Co2SINK Team

    2009-04-01

    the local public, we put some effort in informing interested people, media, politicians on all leveles: regional, state, federal state and European. If suspiciousness and distrust are the enemy of acceptance telling the truth and honesty is its best friend. Role of the media The key arguments find their way to the broad public through the media. Therefore the media have to be seen as partners in science communication, not as enterprise strategy proliferators. Journalists want their story: combine the true story with the true scientific content and you have the chance to get your information into the public. Neutrality and credibility also here are vital issues. We never told that CCS is the simple solution for the climate change problem (which it even cannot be) but that it is a bridge technology for some decades which might give us some more time to change energy production and consumption. All our media activities followed this rule.

  14. Consumer Acceptance of Dry Dog Food Variations

    PubMed Central

    Donfrancesco, Brizio Di; Koppel, Kadri; Swaney-Stueve, Marianne; Chambers, Edgar

    2014-01-01

    Simple Summary The objectives of this study were to compare the acceptance of different dry dog food products by consumers, determine consumer clusters for acceptance, and identify the characteristics of dog food that drive consumer acceptance. Pet owners evaluated dry dog food samples available in the US market. The results indicated that appearance of the sample, especially the color, influenced pet owner’s overall liking more than the aroma of the product. Abstract The objectives of this study were to compare the acceptance of different dry dog food products by consumers, determine consumer clusters for acceptance, and identify the characteristics of dog food that drive consumer acceptance. Eight dry dog food samples available in the US market were evaluated by pet owners. In this study, consumers evaluated overall liking, aroma, and appearance liking of the products. Consumers were also asked to predict their purchase intent, their dog’s liking, and cost of the samples. The results indicated that appearance of the sample, especially the color, influenced pet owner’s overall liking more than the aroma of the product. Overall liking clusters were not related to income, age, gender, or education, indicating that general consumer demographics do not appear to play a main role in individual consumer acceptance of dog food products. PMID:26480043

  15. 77 FR 281 - Green Mountain Power Corporation; Notice of Application Accepted for Filing, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-04

    ... Federal Energy Regulatory Commission Green Mountain Power Corporation; Notice of Application Accepted for...: Green Mountain Power Corporation. e. Name of Projects: Waterbury Hydroelectric Project. f. Location.... h. Applicant Contact: Mr. Jason Lisai, Green Mountain Power Corporation, 163 Acorn Lane,...

  16. 77 FR 41980 - Liberty University, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... Energy Regulatory Commission Liberty University, Inc.; Notice of Preliminary Permit Application Accepted..., Liberty University, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the... Chancellor, Liberty University, 1971 University Blvd., Lynchburg, Virginia 24502; phone: (434)...

  17. 77 FR 61597 - Liberty University, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... Energy Regulatory Commission Liberty University, Inc.; Notice of Preliminary Permit Application Accepted..., Liberty University, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the... Chancellor, Liberty University, 1971 University Blvd., Lynchburg, Virginia 24502; phone: (434)...

  18. 76 FR 24018 - Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... Federal Energy Regulatory Commission Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 1, 2011, Storage Development Partners, LLC, filed an application for a preliminary...

  19. 76 FR 24017 - Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... Energy Regulatory Commission Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 1, 2011, Storage Development Partners, LLC, filed an application for a preliminary permit, pursuant...

  20. Approaches to acceptable risk: a critical guide

    SciTech Connect

    Fischhoff, B.; Lichtenstein, S.; Slovic, P.; Keeney, R.; Derby, S.

    1980-12-01

    Acceptable-risk decisions are an essential step in the management of technological hazards. In many situations, they constitute the weak (or missing) link in the management process. The absence of an adequate decision-making methodology often produces indecision, inconsistency, and dissatisfaction. The result is neither good for hazard management nor good for society. This report offers a critical analysis of the viability of various approaches as guides to acceptable-risk decisions. This report seeks to define acceptable-risk decisions and to examine some frequently proposed, but inappropriate, solutions. 255 refs., 22 figs., 25 tabs.

  1. Hanford Site Solid Waste Acceptance Criteria

    SciTech Connect

    Not Available

    1993-11-17

    This manual defines the Hanford Site radioactive, hazardous, and sanitary solid waste acceptance criteria. Criteria in the manual represent a guide for meeting state and federal regulations; DOE Orders; Hanford Site requirements; and other rules, regulations, guidelines, and standards as they apply to acceptance of radioactive and hazardous solid waste at the Hanford Site. It is not the intent of this manual to be all inclusive of the regulations; rather, it is intended that the manual provide the waste generator with only the requirements that waste must meet in order to be accepted at Hanford Site TSD facilities.

  2. Standardization of DOE Disposal Facilities Waste Acceptance Processes

    SciTech Connect

    Shrader, T. A.; Macbeth, P. J.

    2002-02-26

    On February 25, 2000, the U.S. Department of Energy (DOE) issued the Record of Decision (ROD) for the Waste Management Programmatic Environmental Impact Statement (WM PEIS) for low-level and mixed low-level wastes (LLW/ MLLW) treatment and disposal. The ROD designated the disposal sites at Hanford and the Nevada Test Site (NTS) to dispose of LLW/MLLW from sites without their own disposal facilities. DOE's Richland Operations Office (RL) and the National Nuclear Security Administration's Nevada Operations Office (NV) have been charged with effectively implementing the ROD. To accomplish this task NV and RL, assisted by their operating contractors Bechtel Nevada (BN), Fluor Hanford (FH), and Bechtel Hanford (BH) assembled a task team to systematically map out and evaluate the current waste acceptance processes and develop an integrated, standardized process for the acceptance of LLW/MLLW. A structured, systematic, analytical process using the Six Sigma system identified dispos al process improvements and quantified the associated efficiency gains to guide changes to be implemented. The review concluded that a unified and integrated Hanford/NTS Waste Acceptance Process would be a benefit to the DOE Complex, particularly the waste generators. The Six Sigma review developed quantitative metrics to address waste acceptance process efficiency improvements, and provides an initial look at development of comparable waste disposal cost models between the two disposal sites to allow quantification of the proposed improvements.

  3. Standardization of DOE Disposal Facilities Waste Acceptance Process

    SciTech Connect

    SHRADER, T.; MACBETH, P.

    2002-01-01

    On February 25, 2000, the US. Department of Energy (DOE) issued the Record of Decision (ROD) for the Waste Management Programmatic Environmental Impact Statement (WM PEIS) for low-level and mixed low-level wastes (LLW/ MLLW) treatment and disposal. The ROD designated the disposal sites at Hanford and the Nevada Test Site (NTS) to dispose of LLWMLLW from sites without their own disposal facilities. DOE's Richland Operations Office (RL) and the National Nuclear Security Administration's Nevada Operations Office (NV) have been charged with effectively implementing the ROD. To accomplish this task NV and RL, assisted by their operating contractors Bechtel Nevada (BN), Fluor Hanford (FH), and Bechtel Hanford (BH) assembled a task team to systematically map out and evaluate the current waste acceptance processes and develop an integrated, standardized process for the acceptance of LLWMLLW. A structured, systematic, analytical process using the Six Sigma system identified disposal process improvements and quantified the associated efficiency gains to guide changes to be implemented. The review concluded that a unified and integrated Hanford/NTS Waste Acceptance Process would be a benefit to the DOE Complex, particularly the waste generators. The Six Sigma review developed quantitative metrics to address waste acceptance process efficiency improvements, and provides an initial look at development of comparable waste disposal cost models between the two disposal sites to allow quantification of the proposed improvements.

  4. Anticipating Potential Waste Acceptance Criteria for Defense Spent Nuclear Fuel

    SciTech Connect

    Rechard, R.P.; Lord, M.E.; Stockman, C.T.; McCurley, R.D.

    1997-12-31

    The Office of Environmental Management of the U.S. Department of Energy is responsible for the safe management and disposal of DOE owned defense spent nuclear fuel and high level waste (DSNF/DHLW). A desirable option, direct disposal of the waste in the potential repository at Yucca Mountain, depends on the final waste acceptance criteria, which will be set by DOE`s Office of Civilian Radioactive Waste Management (OCRWM). However, evolving regulations make it difficult to determine what the final acceptance criteria will be. A method of anticipating waste acceptance criteria is to gain an understanding of the DOE owned waste types and their behavior in a disposal system through a performance assessment and contrast such behavior with characteristics of commercial spent fuel. Preliminary results from such an analysis indicate that releases of 99Tc and 237Np from commercial spent fuel exceed those of the DSNF/DHLW; thus, if commercial spent fuel can meet the waste acceptance criteria, then DSNF can also meet the criteria. In large part, these results are caused by the small percentage of total activity of the DSNF in the repository (1.5%) and regulatory mass (4%), and also because commercial fuel cladding was assumed to provide no protection.

  5. Gas characterization system software acceptance test report

    SciTech Connect

    Vo, C.V.

    1996-03-28

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  6. 7 CFR 1205.326 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE COTTON RESEARCH AND PROMOTION Cotton Research and Promotion Order Cotton Board § 1205.326 Acceptance. Any person selected by the Secretary as...

  7. 7 CFR 1205.326 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE COTTON RESEARCH AND PROMOTION Cotton Research and Promotion Order Cotton Board § 1205.326 Acceptance. Any person selected by the Secretary as...

  8. 7 CFR 989.32 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE RAISINS PRODUCED FROM GRAPES GROWN IN CALIFORNIA Order Regulating Handling Raisin Administrative Committee § 989.32 Acceptance. Each person to...

  9. 7 CFR 989.32 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE RAISINS PRODUCED FROM GRAPES GROWN IN CALIFORNIA Order Regulating Handling Raisin Administrative Committee § 989.32 Acceptance. Each person to...

  10. Integrated Model for E-Learning Acceptance

    NASA Astrophysics Data System (ADS)

    Ramadiani; Rodziah, A.; Hasan, S. M.; Rusli, A.; Noraini, C.

    2016-01-01

    E-learning is not going to work if the system is not used in accordance with user needs. User Interface is very important to encourage using the application. Many theories had discuss about user interface usability evaluation and technology acceptance separately, actually why we do not make it correlation between interface usability evaluation and user acceptance to enhance e-learning process. Therefore, the evaluation model for e-learning interface acceptance is considered important to investigate. The aim of this study is to propose the integrated e-learning user interface acceptance evaluation model. This model was combined some theories of e-learning interface measurement such as, user learning style, usability evaluation, and the user benefit. We formulated in constructive questionnaires which were shared at 125 English Language School (ELS) students. This research statistics used Structural Equation Model using LISREL v8.80 and MANOVA analysis.

  11. Gas characterization system software acceptance test procedure

    SciTech Connect

    Vo, C.V.

    1996-02-27

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  12. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office, Waste Acceptance Criteria

    1999-05-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the Nevada Test Site.

  13. What Are Acceptable Limits of Radiation?

    NASA Video Gallery

    Brad Gersey, lead research scientist at the Center for Radiation Engineering and Science for Space Exploration, or CRESSE, at Prairie View A&M University, describes the legal and acceptable limits ...

  14. Generalized group chain acceptance sampling plan

    NASA Astrophysics Data System (ADS)

    Zain, Zakiyah; Mughal, Abdur Razzaque; Aziz, Nazrina

    2015-12-01

    In this article, we proposed an acceptance sampling plan based on generalized group chain truncated life test. The decision on acceptance of a submitted lot can be made by using the cumulative information of the immediately preceding samples. The design parameters of the proposed plan such as the minimum number of groups are found to satisfy the desired quality standard. The benefits of this plan include smaller sample size and reduced overall costs.

  15. Hanford Site Solid Waste Acceptance Criteria

    SciTech Connect

    MCDOWELL, A.K.; TRINER, G.C.

    2002-03-28

    DOE Order 435.1 requires that each treatment, storage, and/or disposal facility (referred to in this document as TSD unit) that manages low-level or transuranic (TRU) waste (including mixed waste and TSCA PCB waste) maintain waste acceptance criteria. These criteria must address the various requirements to operate the TSD unit in compliance with applicable safety and environmental requirements. This document sets forth the baseline criteria for acceptance of waste at TSD units operated by WMP. The criteria for each TSD unit have been established to ensure that waste accepted can be managed in a manner that is within the operating requirements of the unit, including environmental regulations, DOE Orders, permits, technical safety requirements, waste analysis plans, performance assessments, and other applicable requirements. Revisions to the acceptance criteria document require an Unreviewed Safety Question review to document that the changes are consistent with current applicable safety analysis. Acceptance criteria apply to the following TSD units: the Low-Level Burial Grounds (LLBG) including both the nonregulated portions of the LLBG and trenches 31 and 34 of the 218-W-5 Burial Ground for mixed waste disposal; Central Waste Complex (CWC); Waste Receiving and Processing (WRAP) Facility; and T-Plant facility. Waste from all generators, both from the Hanford Site and from offsite facilities, must comply with these criteria. Exceptions can be granted as provided in Section 1.6. Specific waste streams could have additional requirements based on the identified TSD pathway. These requirements are communicated in the waste specification records (WSRds) and/or waste stream profile sheet approvals. The Hanford Site manages nonradioactive waste through direct shipments to offsite contractors. The waste acceptance requirements of the offsite TSD facility must be met for these nonradioactive wastes. This document does not address the acceptance requirements of these offsite

  16. Acceptance Test Plan for ANSYS Software

    SciTech Connect

    CREA, B.A.

    2000-10-25

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled.

  17. Proposed acceptance, qualification, and characterization tests for thin-film PV modules

    NASA Technical Reports Server (NTRS)

    Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.

    1988-01-01

    Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.

  18. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  19. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Site identification as potentially acceptable. 960.3-1-4-1 Section 960.3-1-4-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-1-4-1 Site...

  20. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  1. 30 CFR 585.224 - What happens if BOEM accepts my bid?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 585.224 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Issuance of OCS Renewable Energy Leases Competitive Lease Award Process § 585.224 What happens if BOEM accepts my bid? If...

  2. 30 CFR 585.224 - What happens if BOEM accepts my bid?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What happens if BOEM accepts my bid? 585.224 Section 585.224 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Issuance of OCS Renewable Energy Leases Competitive...

  3. 30 CFR 585.224 - What happens if BOEM accepts my bid?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 585.224 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Issuance of OCS Renewable Energy Leases Competitive Lease Award Process § 585.224 What happens if BOEM accepts my bid? If...

  4. 10 CFR 960.3-2-1 - Site screening for potentially acceptable sites.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Site screening for potentially acceptable sites. 960.3-2-1 Section 960.3-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-1 Site screening...

  5. 77 FR 58821 - Alcoa Power Generating Inc.; Notice of Application Accepted for Filing, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alcoa Power Generating Inc.; Notice of Application Accepted for Filing... seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street,...

  6. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  7. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  8. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  9. 75 FR 48321 - ORPC Alaska, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... the Cook Inlet ] Tidal Energy Project to be located in Cook Inlet in the vicinity of Anchorage, Alaska... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ORPC Alaska, LLC; Notice of Preliminary Permit Application Accepted...

  10. 10 CFR 603.540 - Acceptability of fully depreciated real property or equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Acceptability of fully depreciated real property or equipment. 603.540 Section 603.540 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY... officer must consider: (a) The original cost of the asset; (b) Its estimated remaining useful life at...

  11. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  12. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  13. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  14. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  15. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  16. Toward acceptance of DWPF glass at a Federal Repository

    SciTech Connect

    Plodinec, M.J.; Stevens, W.R. III; Hacker, B.A.; Baxter, R.G.

    1987-01-01

    Construction of the nations's first facility to immobilize defense high-level nuclear waste, the Defense Waste Processing Facility (DWPF) at the Savannah River Plant, is scheduled to be completed soon. The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) has set up a Waste Acceptance Process to provide reasonable assurance that the waste glass produced in the DWPF will be acceptable for permanent storage in a federal repository. As part of this process, detailed specifications have been developed for the waste glass itself, the canister which will contain the waste glass, the sealed canister after it is filled with waste glass, and quality assurance of the product. Savannah River has developed a detailed strategy for demonstrating compliance with each of the specifications, which is documented in a Waste Compliance Plan (WCP). In this paper, the compliance strategy, and progress in implementing the WCP are presented. 12 refs., 3 figs.

  17. Nevada Test Site waste acceptance criteria [Revision 1

    SciTech Connect

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  18. Children acceptance of laser dental treatment

    NASA Astrophysics Data System (ADS)

    Lazea, Andreea; Todea, Carmen

    2016-03-01

    Objectives: To evaluate the dental anxiety level and the degree of acceptance of laser assisted pedodontic treatments from the children part. Also, we want to underline the advantages of laser use in pediatric dentistry, to make this technology widely used in treating dental problems of our children patients. Methods: Thirty pediatric dental patients presented in the Department of Pedodontics, University of Medicine and Pharmacy "Victor Babeş", Timişoara were evaluated using the Wong-Baker pain rating scale, wich was administered postoperatory to all patients, to assess their level of laser therapy acceptance. Results: Wong-Baker faces pain rating scale (WBFPS) has good validity and high specificity; generally it's easy for children to use, easy to compare and has good feasibility. Laser treatment has been accepted and tolerated by pediatric patients for its ability to reduce or eliminate pain. Around 70% of the total sample showed an excellent acceptance of laser dental treatment. Conclusions: Laser technology is useful and effective in many clinical situations encountered in pediatric dentistry and a good level of pacient acceptance is reported during all laser procedures on hard and soft tissues.

  19. Physiologic correlates to background noise acceptance

    NASA Astrophysics Data System (ADS)

    Tampas, Joanna; Harkrider, Ashley; Nabelek, Anna

    2001-05-01

    Acceptance of background noise can be evaluated by having listeners indicate the highest background noise level (BNL) they are willing to accept while following the words of a story presented at their most comfortable listening level (MCL). The difference between the selected MCL and BNL is termed the acceptable noise level (ANL). One of the consistent findings in previous studies of ANL is large intersubject variability in acceptance of background noise. This variability is not related to age, gender, hearing sensitivity, personality, type of background noise, or speech perception in noise performance. The purpose of the current experiment was to determine if individual differences in physiological activity measured from the peripheral and central auditory systems of young female adults with normal hearing can account for the variability observed in ANL. Correlations between ANL and various physiological responses, including spontaneous, click-evoked, and distortion-product otoacoustic emissions, auditory brainstem and middle latency evoked potentials, and electroencephalography will be presented. Results may increase understanding of the regions of the auditory system that contribute to individual noise acceptance.

  20. A proposed model of factors influencing hydrogen fuel cell vehicle acceptance

    NASA Astrophysics Data System (ADS)

    Imanina, N. H. Noor; Kwe Lu, Tan; Fadhilah, A. R.

    2016-03-01

    Issues such as environmental problem and energy insecurity keep worsening as a result of energy use from household to huge industries including automotive industry. Recently, a new type of zero emission vehicle, hydrogen fuel cell vehicle (HFCV) has received attention. Although there are argues on the feasibility of hydrogen as the future fuel, there is another important issue, which is the acceptance of HFCV. The study of technology acceptance in the early stage is a vital key for a successful introduction and penetration of a technology. This paper proposes a model of factors influencing green vehicle acceptance, specifically HFCV. This model is built base on two technology acceptance theories and other empirical studies of vehicle acceptance. It aims to provide a base for finding the key factors influencing new sustainable energy fuelled vehicle, HFCV acceptance which is achieved by explaining intention to accept HFCV. Intention is influenced by attitude, subjective norm and perceived behavioural control from Theory of Planned Behaviour and personal norm from Norm Activation Theory. In the framework, attitude is influenced by perceptions of benefits and risks, and social trust. Perceived behavioural control is influenced by government interventions. Personal norm is influenced by outcome efficacy and problem awareness.

  1. 48 CFR 1346.503 - Place of acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Place of acceptance. 1346... QUALITY ASSURANCE Acceptance 1346.503 Place of acceptance. Insert a clause substantially similar to 1352.246-70, Place of Acceptance, in contracts and solicitations to indicate where the acceptance...

  2. 48 CFR 46.502 - Responsibility for acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... acceptance. 46.502 Section 46.502 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Acceptance 46.502 Responsibility for acceptance. Acceptance of... to a cognizant contract administration office or to another agency (see 42.202(g)), acceptance...

  3. 5 CFR 2601.204 - Conditions for acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Conditions for acceptance. 2601.204... IMPLEMENTATION OF OFFICE OF GOVERNMENT ETHICS STATUTORY GIFT ACCEPTANCE AUTHORITY Guidelines for Solicitation and Acceptance of Gifts § 2601.204 Conditions for acceptance. (a) No gift may be accepted that: (1)...

  4. 48 CFR 570.111 - Inspection and acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Inspection and acceptance... CONTRACTING PROGRAMS ACQUIRING LEASEHOLD INTERESTS IN REAL PROPERTY General 570.111 Inspection and acceptance... acceptance document must contain the square footage accepted and the acceptance date. Include the...

  5. 5 CFR 2601.204 - Conditions for acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Conditions for acceptance. 2601.204... IMPLEMENTATION OF OFFICE OF GOVERNMENT ETHICS STATUTORY GIFT ACCEPTANCE AUTHORITY Guidelines for Solicitation and Acceptance of Gifts § 2601.204 Conditions for acceptance. (a) No gift may be accepted that: (1)...

  6. 48 CFR 46.502 - Responsibility for acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... acceptance. 46.502 Section 46.502 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Acceptance 46.502 Responsibility for acceptance. Acceptance of... to a cognizant contract administration office or to another agency (see 42.202(g)), acceptance...

  7. Nuclear Power Acceptance Among University Staffs and Students

    NASA Astrophysics Data System (ADS)

    Hayder, G.; Rahim, M. S. Ab

    2016-03-01

    The need to consider alternative energy sources becomes very real. Nuclear has been identified as an alternative electricity source. However, media reports seem to indicate that there is a resistance among peoples with regards to harnessing nuclear for energy. This study was conducted to assess the acceptance level of university staff and students towards nuclear energy by asking them to answer a questionnaire. The questionnaire was constructed in a way to gauge their background knowledge on the energy situation of the country, the risks involved with regards to nuclear energy and also what aspects need to be improved in order to have a safe integration of nuclear energy into the national energy mix. The overall result of the questionnaire indicated high level of support for nuclear energy. The main areas of concerns however, were waste management, control and governance and also nuclear accidents. These should be identified as fields that require extra attention. However, the positive result obtained from this survey should not be construed as overall strong support in general. There might be different outcomes if the survey was conducted on to the general population as compared to the university students and staff that were involved in this research.

  8. [The acceptability of different oral contraceptive methods].

    PubMed

    Klinger, G; Fritzsche, H; Hempel, E; Carol, W; Böhme, W; Scholz, B; Grass, M; Chemnitius, K H

    1975-05-01

    Results of a survey of contraceptive acceptability are reported. In formation on oral and depot hormonal contraceptives was distributed to 1064 Ovosiston or Nonovlon users, 110 women using depot contraceptives, and 609 women who had never used hormonal contraception. The women's preferences with regard to administration schedule, and their perceptions of effectiveness and safety were noted. Non-users considered daily, weekly, or monthly administration acceptable, while only 2/3 of those taking oral contraceptives thought daily administration convenient. 90.2% of Deposiston patients did not care for daily administration. Deposiston patients also had the greatest confidence in their method. The authors believe on the basis of this survey that weekly administration may be highly acceptable alternative t o conventional oral contraception. PMID:1140078

  9. Conditions for the acceptance of deontic conditionals.

    PubMed

    Over, D E; Manktelow, K I; Hadjichristidis, C

    2004-06-01

    Recent psychological research has investigated how people assess the probability of an indicative conditional. Most people give the conditional probability of q given p as the probability of if p then q. Asking about the probability of an indicative conditional, one is in effect asking about its acceptability. But on what basis are deontic conditionals judged to be acceptable or unacceptable? Using a decision theoretic analysis, we argue that a deontic conditional, of the form if p then must q or if p then may q, will be judged acceptable to the extent that the p & q possibility is preferred to the p & not-q possibility. Two experiments are reported in which this prediction was upheld. There was also evidence that the pragmatic suitability of permission rules is partly determined by evaluations of the not-p & q possibility. Implications of these results for theories of deontic reasoning are discussed. PMID:15285599

  10. Acceptance Priority Ranking & Annual Capacity Report

    SciTech Connect

    2004-07-31

    The Nuclear Waste Policy Act of 1982, as amended (the Act), assigns the Federal Government the responsibility for the disposal of spent nuclear fuel and high-level waste. Section 302(a) of the Act authorizes the Secretary to enter into contracts with the owners and generators of commercial spent nuclear fuel and/or high-level waste. The Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) established the contractual mechanism for the Department's acceptance and disposal of spent nuclear fuel and high-level waste. It includes the requirements and operational responsibilities of the parties to the Standard Contract in the areas of administrative matters, fees, terms of payment, waste acceptance criteria, and waste acceptance procedures. The Standard Contract provides for the acquisition of title to the spent nuclear fuel and/or high-level waste by the Department, its transportation to Federal facilities, and its subsequent disposal.

  11. Hanford Site solid waste acceptance criteria

    SciTech Connect

    Ellefson, M.D.

    1998-07-01

    Order 5820.2A requires that each treatment, storage, and/or disposal facility (referred to in this document as TSD unit) that manages low-level or transuranic waste (including mixed waste and TSCA PCB waste) maintain waste acceptance criteria. These criteria must address the various requirements to operate the TSD unit in compliance with applicable safety and environmental requirements. This document sets forth the baseline criteria for acceptance of radioactive waste at TSD units operated by WMH. The criteria for each TSD unit have been established to ensure that waste accepted can be managed in a manner that is within the operating requirements of the unit, including environmental regulations, DOE Orders, permits, technical safety requirements, waste analysis plans, performance assessments, and other applicable requirements. Acceptance criteria apply to the following TSD units: the Low-Level Burial Grounds (LLBG) including both the nonregulated portions of the LLBG and trenches 31 and 34 of the 218-W-5 Burial Ground for mixed waste disposal; Central Waste Complex (CWC); Waste Receiving and Processing Facility (WRAP); and T Plant Complex. Waste from all generators, both from the Hanford Site and from offsite facilities, must comply with these criteria. Exceptions can be granted as provided in Section 1.6. Specific waste streams could have additional requirements based on the 1901 identified TSD pathway. These requirements are communicated in the Waste Specification Records (WSRds). The Hanford Site manages nonradioactive waste through direct shipments to offsite contractors. The waste acceptance requirements of the offsite TSD facility must be met for these nonradioactive wastes. This document does not address the acceptance requirements of these offsite facilities.

  12. Differences in HIV vaccine acceptability between genders.

    PubMed

    Kakinami, Lisa; Newman, Peter A; Lee, Sung-Jae; Duan, Naihua

    2008-05-01

    The development of safe and efficacious preventive HIV vaccines offers the best long-term hope of controlling the AIDS pandemic. Nevertheless, suboptimal uptake of safe and efficacious vaccines that already exist suggest that HIV vaccine acceptability cannot be assumed, particularly among communities most vulnerable to HIV. The present study aimed to identify barriers and motivators to future HIV vaccine acceptability among low socioeconomic, ethnically diverse men and women in Los Angeles County. Participants completed a cross-sectional survey assessing their attitudes and beliefs regarding future HIV vaccines. Hypothetical HIV vaccine scenarios were administered to determine HIV vaccine acceptability. Two-sided t-tests were performed, stratified by gender, to examine the association between vaccine acceptability and potential barriers and motivators. Barriers to HIV vaccine acceptability differed between men and women. For women, barriers to HIV vaccine acceptability were related to their intimate relationships (p<0.05), negative experiences with health care providers (p<0.05) and anticipated difficulties procuring insurance (p<0.01). Men were concerned that the vaccine would weaken the immune system (p<0.005) or would affect their HIV test results (p<0.05). Motivators for women included the ability to conceive a child without worrying about contracting HIV (p<0.10) and support from their spouse/significant other for being vaccinated (p<0.10). Motivators for men included feeling safer with sex partners (p<0.05) and social influence from friends to get vaccinated (p<0.005). Family support for HIV immunization was a motivator for both men and women (p<0.10). Gender-specific interventions may increase vaccine acceptability among men and women at elevated risk for HIV infection. Among women, interventions need to focus on addressing barriers due to gendered power dynamics in relationships and discrimination in health care. Among men, education that addresses fears

  13. Measuring Acceptance of Sleep Difficulties: The Development of the Sleep Problem Acceptance Questionnaire

    PubMed Central

    Bothelius, Kristoffer; Jernelöv, Susanna; Fredrikson, Mats; McCracken, Lance M.; Kaldo, Viktor

    2015-01-01

    Study Objectives: Acceptance may be an important therapeutic process in sleep medicine, but valid psychometric instruments measuring acceptance related to sleep difficulties are lacking. The purpose of this study was to develop a measure of acceptance in insomnia, and to examine its factor structure as well as construct validity. Design: In a cross-sectional design, a principal component analysis for item reduction was conducted on a first sample (A) and a confirmatory factor analysis on a second sample (B). Construct validity was tested on a combined sample (C). Setting: Questionnaire items were derived from a measure of acceptance in chronic pain, and data were gathered through screening or available from pretreatment assessments in four insomnia treatment trials, administered online, via bibliotherapy and in primary care. Participants: Adults with insomnia: 372 in sample A and 215 in sample B. Sample C (n = 820) included sample A and B with another 233 participants added. Measures: Construct validity was assessed through relations with established acceptance and sleep scales. Results: The principal component analysis presented a two-factor solution with eight items, explaining 65.9% of the total variance. The confirmatory factor analysis supported the solution. Acceptance of sleep problems was more closely related to subjective symptoms and consequences of insomnia than to diary description of sleep, or to acceptance of general private events. Conclusions: The Sleep Problem Acceptance Questionnaire (SPAQ), containing the subscales “Activity Engagement” and “Willingness”, is a valid tool to assess acceptance of insomnia. Citation: Bothelius K, Jernelöv S, Fredrikson M, McCracken LM, Kaldo V. Measuring acceptance of sleep difficulties: the development of the sleep problem acceptance questionnaire. SLEEP 2015;38(11):1815–1822. PMID:26085302

  14. Waste acceptance product specifications for vitrified high-level waste forms. Revision 1

    SciTech Connect

    Applewhite-Ramsey, A.; Sproull, J.F.

    1993-06-01

    The Nuclear Waste Policy Act of 1982 mandated that all high-level waste (HLW) be sent to a federal geologic repository for permanent disposal. DOE published the Environmental Assessment in 1982 which identified borosilicate glass as the chosen HLW form.{sup 1} In 1985 the Department of Energy instituted a Waste Acceptance Process to assure that DWPF glass waste forms would be acceptable to such a repository. This assurance was important since production of waste forms will precede repository construction and licensing. As part of this Waste Acceptance Process, the DOE Office of Civilian Radioactive Waste Management (RW) formed the Waste Acceptance Committee (WAC). The WAC included representatives from the candidate repository sites, the waste producing sites and DOE. The WAC was responsible for developing the Waste Acceptance Preliminary Specifications (WAPS) which defined the requirements the waste forms must meet to be compatible with the candidate repository geologies.

  15. Technology Acceptance in an Academic Context: Faculty Acceptance of Online Education

    ERIC Educational Resources Information Center

    Gibson, Shanan G.; Harris, Michael L.; Colaric, Susan M.

    2008-01-01

    The authors surveyed faculty from a college of business and a college of education regarding their attitudes toward online education. Results of the survey were examined to determine the degree to which the technology acceptance model was able to adequately explain faculty acceptance of online education. Results indicate that perceived usefulness…

  16. Measuring Technology Acceptance Level of Turkish Pre-Service English Teachers by Using Technology Acceptance Model

    ERIC Educational Resources Information Center

    Kirmizi, Özkan

    2014-01-01

    The aim of this study is to investigate technology acceptance of prospective English teachers by using Technology Acceptance Model (TAM) in Turkish context. The study is based on Structural Equation Model (SEM). The participants of the study from English Language Teaching Departments of Hacettepe, Gazi and Baskent Universities. The participants…

  17. Startup of the FFTF sodium cooled reactor. [Acceptance Test Program

    SciTech Connect

    Redekopp, R.D.; Umek, A.M.

    1981-03-01

    The Fast Flux Test Facility (FFTF), located on the Department of Energy (DOE) Hanford Reservation near Richland, Washington, is a 3 Loop 400 MW(t) sodium cooled fast reactor with a primary mission to test fuels and materials for development of the Liquid Metal Fast Breeder Reactor (LMFBR). Bringing FFTF to a condition to accomplish this mission is the goal of the Acceptance Test Program (ATP). This program was the mechanism for achieving startup of the FFTF. Highlights of the ATP involving the system inerting, liquid metal and inerted cell testing and initial ascent to full power are discussed.

  18. Acceptability of risk from radiation: Application to human space flight

    SciTech Connect

    1997-04-30

    This one of NASA`s sponsored activities of the NCRP. In 1983, NASA asked NCRP to examine radiation risks in space and to make recommendations about career radiation limits for astronauts (with cancer considered as the principal risk). In conjunction with that effort, NCRP was asked to convene this symposium; objective is to examine the technical, strategic, and philosophical issues pertaining to acceptable risk and radiation in space. Nine papers are included together with panel discussions and a summary. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  19. Establishing the acceptability of Savannah River site waste glass

    SciTech Connect

    Plodinec, M.J.; Kitchen, B.G.

    1990-01-01

    The United States' first facility to immobilize high-level nuclear waste, the Defense Waste Processing Facility (DWPF), will soon begin integrated nonradioactive testing. An important objective of that testing is to demonstrate that the DWPF product will comply with specifications established by the Department of Energy's Office of Civilian Radioactive Waste Management (RW). In this report, the DWPF process and product are described, and the approach being taken to establish the acceptability of the DWPF product is presented. 8 refs., 2 figs., 1 tab.

  20. Evolving an acceptable nuclear power fuel cycle

    SciTech Connect

    Steinberg, M.

    1986-10-01

    The following issues are examined: long-term safe nuclear power plant operation; acceptable nuclear waste management and, mainly, high-level waste management; and provision for long-term fissile fuel supply in a long-term nuclear fission economy. (LM)

  1. 48 CFR 611.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Market acceptance. 611.103 Section 611.103 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 611.103 Market...

  2. 48 CFR 611.103 - Market acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Market acceptance. 611.103 Section 611.103 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 611.103 Market...

  3. 78 FR 8189 - Acceptance of Concurrent Jurisdiction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR National Park Service Acceptance of Concurrent Jurisdiction AGENCY: National Park Service, Interior. ACTION: Notice of Concurrent Jurisdiction. SUMMARY: On behalf of the United States, the National Park Service...

  4. 48 CFR 2811.103 - Market acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Market acceptance. 2811.103 Section 2811.103 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Competition and Acquisition Planning DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 2811.103 Market...

  5. 78 FR 41078 - Acceptance of Concurrent Jurisdiction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR National Park Service Acceptance of Concurrent Jurisdiction AGENCY: National Park Service, Interior. ACTION: Notice of Concurrent Jurisdiction. SUMMARY: On behalf of the United States, the National Park Service...

  6. Generator acceptance test and inspection report

    SciTech Connect

    Johns, B.R.

    1997-07-24

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing.

  7. Acceptance of School Integration: 1965-1969

    ERIC Educational Resources Information Center

    Alston, Jon P.; Knapp, Melvin J.

    1971-01-01

    This national study reports on the changing attitudes of white adults having school age children toward school integration during the period 1965-1969. Stresses the importance of regional and educational variables. With the exception of farmers, most non-Southern respondents accepted some form of school integration. (DM)

  8. School Choice Acceptance: An Exploratory Explication

    ERIC Educational Resources Information Center

    Koven, Steven G.; Khan, Mobin

    2014-01-01

    School choice is presented by some as a panacea to the challenges facing education in the United States. Acceptance of choice as a solution, however, is far from universal. This article examines two possible contributors to choice adoption: ideology and political culture. Political culture was found to better explain the complex phenomenon of…

  9. AIR CLEANING FOR ACCEPTABLE INDOOR AIR QUALITY

    EPA Science Inventory

    The paper discusses air cleaning for acceptable indoor air quality. ir cleaning has performed an important role in heating, ventilation, and air-conditioning systems for many years. raditionally, general ventilation air-filtration equipment has been used to protect cooling coils ...

  10. 7 CFR 923.25 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Acceptance. 923.25 Section 923.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE SWEET CHERRIES GROWN IN...

  11. 7 CFR 923.25 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Acceptance. 923.25 Section 923.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE SWEET CHERRIES GROWN IN...

  12. 7 CFR 930.26 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Acceptance. 930.26 Section 930.26 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE TART CHERRIES GROWN IN THE STATES...

  13. 7 CFR 920.25 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Acceptance. 920.25 Section 920.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE KIWIFRUIT GROWN IN...

  14. 7 CFR 920.25 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Acceptance. 920.25 Section 920.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE KIWIFRUIT GROWN IN...

  15. 7 CFR 920.25 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Acceptance. 920.25 Section 920.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE KIWIFRUIT GROWN IN...

  16. 37 CFR 1.803 - Acceptable depository.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Acceptable depository. 1.803 Section 1.803 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...

  17. 37 CFR 1.803 - Acceptable depository.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Acceptable depository. 1.803 Section 1.803 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...

  18. 37 CFR 1.803 - Acceptable depository.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Acceptable depository. 1.803 Section 1.803 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...

  19. 37 CFR 1.803 - Acceptable depository.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Acceptable depository. 1.803 Section 1.803 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...

  20. 7 CFR 925.25 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Acceptance. 925.25 Section 925.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE GRAPES GROWN IN A DESIGNATED AREA...

  1. 7 CFR 925.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 925.25 Section 925.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE GRAPES GROWN IN A DESIGNATED AREA...

  2. 7 CFR 989.32 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Acceptance. 989.32 Section 989.32 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE RAISINS PRODUCED FROM GRAPES GROWN...

  3. 7 CFR 989.32 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 989.32 Section 989.32 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE RAISINS PRODUCED FROM GRAPES GROWN...

  4. 7 CFR 925.25 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Acceptance. 925.25 Section 925.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE GRAPES GROWN IN A DESIGNATED AREA...

  5. 7 CFR 925.25 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Acceptance. 925.25 Section 925.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE GRAPES GROWN IN A DESIGNATED AREA...

  6. 7 CFR 925.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 925.25 Section 925.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE GRAPES GROWN IN A DESIGNATED AREA...

  7. 7 CFR 930.26 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Acceptance. 930.26 Section 930.26 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE TART CHERRIES GROWN IN THE STATES...

  8. 7 CFR 923.25 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Acceptance. 923.25 Section 923.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE SWEET CHERRIES GROWN IN...

  9. Retained gas sampler system acceptance test report

    SciTech Connect

    Cannon, N.S., Westinghouse Hanford

    1996-07-18

    Acceptance test results for the Retained Gas Sampler System (RGSS) obtained in the 306E laboratory are reported. The RGSS will be utilized to retrieve and analyze samples from the Hanford flammable gas watch-list tanks to determine the quantity and chemistry of gases confined within the waste.

  10. 7 CFR 915.25 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Acceptance. 915.25 Section 915.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE AVOCADOS GROWN IN SOUTH FLORIDA...

  11. 7 CFR 915.25 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Acceptance. 915.25 Section 915.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE AVOCADOS GROWN IN SOUTH FLORIDA...

  12. 7 CFR 915.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 915.25 Section 915.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE AVOCADOS GROWN IN SOUTH FLORIDA...

  13. Examining Social Acceptance & Rejection. FPG Snapshot #44

    ERIC Educational Resources Information Center

    FPG Child Development Institute, 2007

    2007-01-01

    This FPG Snapshot summarizes the findings of a study, published in the November 2006 issue of the "Journal of Educational Psychology," that examined whether children with disabilities are accepted or rejected by their classmates in inclusive classrooms. Specifically, the study examined two sets of related questions: (1) Are individual children…

  14. 37 CFR 1.803 - Acceptable depository.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Acceptable depository. 1.803 Section 1.803 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...

  15. Workaholism, Health, and Self-Acceptance

    ERIC Educational Resources Information Center

    Chamberlin, Christine M.; Zhang, Naijian

    2009-01-01

    This study examined the relationships between workaholism, perceived parental workaholism, self-acceptance, psychological well-being, and physical symptoms among 347 college students. Statistically significant relationships were found between college students' perceived parental workaholism and their own workaholism. Also, relationships between…

  16. 75 FR 44046 - Noise Exposure Map Acceptance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... Federal Aviation Administration Noise Exposure Map Acceptance ACTION: Notice. SUMMARY: The Federal Aviation Administration (FAA) announces its determination that the noise exposure maps submitted by the... on the noise exposure maps is June 1, 2010. FOR FURTHER INFORMATION CONTACT: Edward S. Gabsewics,...

  17. 7 CFR 955.24 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 955.24 Section 955.24 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE VIDALIA ONIONS GROWN IN...

  18. 7 CFR 955.24 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Acceptance. 955.24 Section 955.24 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE VIDALIA ONIONS GROWN IN...

  19. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Acceptable sureties. 1788.50 Section 1788.50 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS...

  20. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Acceptable sureties. 1788.50 Section 1788.50 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS...

  1. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Acceptable sureties. 1788.50 Section 1788.50 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS...

  2. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Acceptable sureties. 1788.50 Section 1788.50 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS...

  3. 7 CFR 1788.50 - Acceptable sureties.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Acceptable sureties. 1788.50 Section 1788.50 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS...

  4. Patients’ acceptance of corticotomy-assisted orthodontics

    PubMed Central

    Zawawi, Khalid H

    2015-01-01

    Objective To study patients’ acceptance of corticotomy-assisted orthodontics as a treatment option. Methods Adult patients seeking orthodontic treatment were asked to complete two sets of questionnaires; the first set included questions about age, sex, and level of education and general questions about orthodontic treatment; and the second set was related to the corticotomy-assisted orthodontics. Before answering the corticotomy questions, a brief description of the clinical procedure was explained and photographs of an actual procedure were shown. Results A total of 150 subjects were approached and 129 (86%) agreed to answer the questionnaires (72 male and 57 female patients). Of these, only 3.1% did hear about corticotomy and 7.8% selected corticotomy instead of extraction. Fear from the surgery (53.2%) was the most frequent reason for not selecting corticotomy followed by fear from pain (36.9%). The acceptance of corticotomy between males and females was similar. No relationship was found between the level of education and prior knowledge of the procedure, P=0.857. Prior knowledge about corticotomy was not a factor in selecting it as a treatment option (P=0.556) to reduce the treatment time (P=0.427). Conclusion The acceptance of corticotomy-assisted orthodontics as a treatment option was low. Fear from the surgery was the main reason for not selecting it. The acceptance of corticotomy-assisted orthodontics was not related to patient’s level of education or sex. PMID:26316719

  5. 48 CFR 2811.103 - Market acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Market acceptance. 2811.103 Section 2811.103 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 2811.103...

  6. 48 CFR 611.103 - Market acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Market acceptance. 611.103 Section 611.103 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 611.103 Market...

  7. 48 CFR 811.103 - Market acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Market acceptance. 811.103 Section 811.103 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 811.103...

  8. 48 CFR 1311.103 - Market acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Market acceptance. 1311.103 Section 1311.103 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 1311.103...

  9. 48 CFR 2811.103 - Market acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Market acceptance. 2811.103 Section 2811.103 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 2811.103...

  10. 48 CFR 611.103 - Market acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Market acceptance. 611.103 Section 611.103 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 611.103 Market...

  11. 48 CFR 611.103 - Market acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Market acceptance. 611.103 Section 611.103 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 611.103 Market...

  12. 48 CFR 811.103 - Market acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Market acceptance. 811.103 Section 811.103 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 811.103...

  13. 48 CFR 2811.103 - Market acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Market acceptance. 2811.103 Section 2811.103 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 2811.103...

  14. 48 CFR 1311.103 - Market acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Market acceptance. 1311.103 Section 1311.103 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 1311.103...

  15. 48 CFR 1311.103 - Market acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Market acceptance. 1311.103 Section 1311.103 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 1311.103...

  16. 48 CFR 811.103 - Market acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Market acceptance. 811.103 Section 811.103 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and Developing Requirements Documents 811.103...

  17. Void fraction instrument acceptance test procedure

    SciTech Connect

    Pearce, K.L.

    1994-09-15

    This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating as designed.

  18. 7 CFR 955.24 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Acceptance. 955.24 Section 955.24 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE VIDALIA ONIONS GROWN IN...

  19. 7 CFR 955.24 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Acceptance. 955.24 Section 955.24 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE VIDALIA ONIONS GROWN IN...

  20. 7 CFR 955.24 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 955.24 Section 955.24 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE VIDALIA ONIONS GROWN IN...

  1. 7 CFR 929.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 929.25 Section 929.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE CRANBERRIES GROWN IN STATES...

  2. 7 CFR 929.25 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Acceptance. 929.25 Section 929.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE CRANBERRIES GROWN IN STATES...

  3. 7 CFR 929.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 929.25 Section 929.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE CRANBERRIES GROWN IN STATES...

  4. 7 CFR 929.25 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Acceptance. 929.25 Section 929.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE CRANBERRIES GROWN IN STATES...

  5. 7 CFR 929.25 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Acceptance. 929.25 Section 929.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE CRANBERRIES GROWN IN STATES...

  6. 7 CFR 922.25 - Acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 8 2013-01-01 2013-01-01 false Acceptance. 922.25 Section 922.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE APRICOTS GROWN IN DESIGNATED...

  7. 7 CFR 922.25 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Acceptance. 922.25 Section 922.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE APRICOTS GROWN IN DESIGNATED...

  8. 7 CFR 922.25 - Acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 8 2012-01-01 2012-01-01 false Acceptance. 922.25 Section 922.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE APRICOTS GROWN IN DESIGNATED...

  9. 7 CFR 922.25 - Acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 8 2014-01-01 2014-01-01 false Acceptance. 922.25 Section 922.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; FRUITS, VEGETABLES, NUTS), DEPARTMENT OF AGRICULTURE APRICOTS GROWN IN DESIGNATED...

  10. 7 CFR 922.25 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 8 2011-01-01 2011-01-01 false Acceptance. 922.25 Section 922.25 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE APRICOTS GROWN IN DESIGNATED...

  11. Attachment, Temperament, and Preschool Children's Peer Acceptance

    ERIC Educational Resources Information Center

    Szewczyk-Sokolowski, Margaret; Bost, Kelly K.; Wainwright, Ada B.

    2005-01-01

    This study examined the relations between preschool children's attachment security, temperament, and peer acceptance. Ninety-eight preschool children and their mothers were recruited through childcare centers in the southeast. Mothers and their children participated in two two-hour home observations. Attachment security was assessed using the…

  12. Treatment Acceptability among Mexican American Parents

    ERIC Educational Resources Information Center

    Borrego, Joaquin, Jr.; Ibanez, Elizabeth S.; Spendlove, Stuart J.; Pemberton, Joy R.

    2007-01-01

    There is a void in the literature with regard to Hispanic parents' views about common interventions for children with behavior problems. The purpose of this study was to examine the treatment acceptability of child management techniques in a Mexican American sample. Parents' acculturation was also examined to determine if it would account for…

  13. Peer Acceptance and Friendship: An Investigation.

    ERIC Educational Resources Information Center

    Bishop, Julia A.; Inderbitzen, Heidi M.

    1995-01-01

    Investigated how peer acceptance and friendship were related to self-esteem in adolescents. Ninth-grade students (n=542) were classified by sociometric group and presence or absence of reciprocal friendships. Results indicate no significant difference in self-esteem scores across sociometric groups. Subjects with one friend had higher self-esteem…

  14. Acceptance of Swedish e-health services

    PubMed Central

    Jung, Mary-Louise; Loria, Karla

    2010-01-01

    Objective: To investigate older people’s acceptance of e-health services, in order to identify determinants of, and barriers to, their intention to use e-health. Method: Based on one of the best-established models of technology acceptance, Technology Acceptance Model (TAM), in-depth exploratory interviews with twelve individuals over 45 years of age and of varying backgrounds are conducted. Results: This investigation could find support for the importance of usefulness and perceived ease of use of the e-health service offered as the main determinants of people’s intention to use the service. Additional factors critical to the acceptance of e-health are identified, such as the importance of the compatibility of the services with citizens’ needs and trust in the service provider. Most interviewees expressed positive attitudes towards using e-health and find these services useful, convenient, and easy to use. Conclusion: E-health services are perceived as a good complement to traditional health care service delivery, even among older people. These people, however, need to become aware of the e-health alternatives that are offered to them and the benefits they provide. PMID:21289860

  15. Perceived Parental Acceptance and Female Juvenile Delinquency.

    ERIC Educational Resources Information Center

    Kroupa, Steven E.

    1988-01-01

    Studied adolescent females at a state training school and at a high school, measuring perceived parental acceptance. Demonstrated that incarcerated females viewed their mothers and fathers more negatively than did nonincarcerated females. Indicated more ambivalent results in the mother-daughter than the father-daughter relationship. Discusses…

  16. Review of Recent Treatment Acceptability Research

    ERIC Educational Resources Information Center

    Carter, Stacy L.

    2007-01-01

    With recent increases in the use of positive approaches to treatment for individuals with developmental disabilities, it seems appropriate to review the variables that have been found to influence the acceptability of various treatments. Programmatic treatments for problematic behaviors that incorporate primarily positive (reinforcement)…

  17. Acceptance of sugar reduction in flavored yogurt.

    PubMed

    Chollet, M; Gille, D; Schmid, A; Walther, B; Piccinali, P

    2013-09-01

    To investigate what level of sugar reduction is accepted in flavored yogurt, we conducted a hedonic test focusing on the degree of liking of the products and on optimal sweetness and aroma levels. For both flavorings (strawberry and coffee), consumers preferred yogurt containing 10% added sugar. However, yogurt containing 7% added sugar was also acceptable. On the just-about-right scale, yogurt containing 10% sugar was more often described as too sweet compared with yogurt containing 7% sugar. On the other hand, the sweetness and aroma intensity for yogurt containing 5% sugar was judged as too low. A second test was conducted to determine the effect of flavoring concentration on the acceptance of yogurt containing 7% sugar. Yogurts containing the highest concentrations of flavoring (11% strawberry, 0.75% coffee) were less appreciated. Additionally, the largest percentage of consumers perceived these yogurts as "not sweet enough." These results indicate that consumers would accept flavored yogurts with 7% added sugar instead of 10%, but 5% sugar would be too low. Additionally, an increase in flavor concentration is undesirable for yogurt containing 7% added sugar. PMID:23871368

  18. Emperical Tests of Acceptance Sampling Plans

    NASA Technical Reports Server (NTRS)

    White, K. Preston, Jr.; Johnson, Kenneth L.

    2012-01-01

    Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

  19. W-087 Acceptance test procedure. Revision 1

    SciTech Connect

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  20. 29 CFR 1926.29 - Acceptable certifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Acceptable certifications. (a) Pressure vessels. Current and valid certification by an insurance company or... be in compliance with the requirements of this part when evidence of current and valid certification by an insurance company or regulatory authority attesting to the safe installation, inspection,...

  1. Accepted Peer Practices in Adventure Programming.

    ERIC Educational Resources Information Center

    Johanson, Karl M., Comp.

    For the purpose of raising the level of safety, encouraging educational institutions and training programs to develop leaders, providing information for programs, establishing a base for communication with land use agencies, and providing information for school and agency custodians of potential students, the manual outlines "Accepted Peer…

  2. Acceptance test report: Backup power system

    SciTech Connect

    Cole, D.B.

    1996-01-26

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control.

  3. Risk comparisons, conflict, and risk acceptability claims.

    PubMed

    Johnson, Branden B

    2004-02-01

    Despite many claims for and against the use of risk comparisons in risk communication, few empirical studies have explored their effect. Even fewer have examined the public's relative preferences among different kinds of risk comparisons. Two studies, published in this journal in 1990 and 2003, used seven measures of "acceptability" to examine public reaction to 14 examples of risk comparisons, as used by a hypothetical factory manager to explain risks of his ethylene oxide plant. This study examined the effect on preferences of scenarios involving low or high conflict between the factory manager and residents of the hypothetical town (as had the 2003 study), and inclusion of a claim that the comparison demonstrated the risks' acceptability. It also tested the Finucane et al. (2000) affect hypothesis that information emphasizing low risks-as in these risk comparisons-would raise benefits estimates without changing risk estimates. Using similar but revised scenarios, risk comparison examples (10 instead of 14), and evaluation measures, an opportunity sample of 303 New Jersey residents rated the comparisons, and the risks and benefits of the factory. On average, all comparisons received positive ratings on all evaluation measures in all conditions. Direct and indirect measures showed that the conflict manipulation worked; overall, No-Conflict and Conflict scenarios evoked scores that were not significantly different. The attachment to each risk comparison of a risk acceptability claim ("So our factory's risks should be acceptable to you.") did not worsen ratings relative to conditions lacking this claim. Readers who did or did not see this claim were equally likely to infer an attempt to persuade them to accept the risk from the comparison. As in the 2003 article, there was great individual variability in inferred rankings of the risk comparisons. However, exposure to the risk comparisons did not reduce risk estimates significantly (while raising benefit estimates

  4. Staff Acceptance of Tele-ICU Coverage

    PubMed Central

    Chan, Paul S.; Cram, Peter

    2011-01-01

    Background: Remote coverage of ICUs is increasing, but staff acceptance of this new technology is incompletely characterized. We conducted a systematic review to summarize existing research on acceptance of tele-ICU coverage among ICU staff. Methods: We searched for published articles pertaining to critical care telemedicine systems (aka, tele-ICU) between January 1950 and March 2010 using PubMed, Cumulative Index to Nursing and Allied Health Literature, Global Health, Web of Science, and the Cochrane Library and abstracts and presentations delivered at national conferences. Studies were included if they provided original qualitative or quantitative data on staff perceptions of tele-ICU coverage. Studies were imported into content analysis software and coded by tele-ICU configuration, methodology, participants, and findings (eg, positive and negative staff evaluations). Results: Review of 3,086 citations yielded 23 eligible studies. Findings were grouped into four categories of staff evaluation: overall acceptance level of tele-ICU coverage (measured in 70% of studies), impact on patient care (measured in 96%), impact on staff (measured in 100%), and organizational impact (measured in 48%). Overall acceptance was high, despite initial ambivalence. Favorable impact on patient care was perceived by > 82% of participants. Staff impact referenced enhanced collaboration, autonomy, and training, although scrutiny, malfunctions, and contradictory advice were cited as potential barriers. Staff perceived the organizational impact to vary. An important limitation of available studies was a lack of rigorous methodology and validated survey instruments in many studies. Conclusions: Initial reports suggest high levels of staff acceptance of tele-ICU coverage, but more rigorous methodologic study is required. PMID:21051386

  5. Effects of space charge on the acceptance of brightness measuring devices

    SciTech Connect

    Caporaso, G.J.

    1985-08-14

    Attempts to measure high electron beam brightness at low values of beam energy are plagued by the effects of space charge forces. These forces can substantially lower the phase space acceptance of various brightness measuring devices. This report considers several models for the effects of space charge upon the acceptance of both the field free, double aperture system and the magnetic ''emittance selector'' and compares them for some recent experiments on ATA and the High Brightness Test Stand. Reasonably conservative correction factors for the acceptances of these devices are derived.

  6. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER...

  7. 78 FR 45523 - Davis Hydro, LLC Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Davis Hydro, LLC Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 4, 2013, the Davis Hydro, LLC, filed an application for...

  8. 76 FR 70720 - KC LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission KC LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 11, 2011, KC LLC filed an application for a preliminary...

  9. 76 FR 11446 - Erie Boulevard Hydropower, LP; Notice of Application Accepted for Filing, Soliciting Motions to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Erie Boulevard Hydropower, LP; Notice of Application Accepted for Filing, Soliciting Motions to Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and...

  10. 78 FR 78354 - Borough of Weatherly; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Borough of Weatherly; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On November 4, 2013, the Borough of Weatherly (Borough)...

  11. 76 FR 30327 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  12. 76 FR 45252 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC, filed an application, pursuant to section 4(f) of the Federal Power Act,...

  13. 76 FR 45251 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC, filed an application, pursuant to section 4(f) of the Federal Power Act,...

  14. 76 FR 30339 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  15. 76 FR 30340 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  16. 77 FR 9229 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  17. 75 FR 40801 - Wilkesboro Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wilkesboro Hydropower, LLC; Notice of Application Accepted for Filing and...: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location:...

  18. 78 FR 25263 - Hydrodynamics, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hydrodynamics, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, Hydrodynamics, Inc. filed an...

  19. 77 FR 29634 - Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Corral Creek South Hydro, LLC On April 3, 2012, Corral Creek South Hydro, LLC, filed...

  20. 78 FR 7774 - Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 11, 2013, Alaska Electric...