Main View
This view is used for searching all possible sources.
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
1
Proposed Performance Evaluation Acceptance Test for Heat ...
1988-08-01

... thermal energy recovery testing was also ... of the acceptance test procedure, the ... RECOVERY, *ACCEPTANCE TESTS, VOLUME, ENVIRONMENTS ...

DTIC Science & Technology

2
Recommended Acceptance Testing Procedure for Network ...
2005-08-01

... Title : Recommended Acceptance Testing Procedure for Network Enabled Training Simulators. Descriptive Note : Technical rept. ...

DTIC Science & Technology

3
Electrical interlock acceptance test procedure for 244-U
1994-09-13

The attached procedure provides the steps necessary to acceptance test the 244U DCRT electrical interlocks system.

Energy Citations Database

4
Acceptance Testing Procedures for Heating, Ventilating, and ...
1999-05-01

... Accession Number : ADA366656. Title : Acceptance Testing Procedures for Heating, Ventilating, and Air-Conditioning Systems. ...

DTIC Science & Technology

5
Acceptance test procedure for the MO-294 Building
1995-01-01

This supporting document provides the Acceptance Test Procedure (ATP) for the acceptance and testing of the fire alarm system of mobile office MO-294.

Energy Citations Database

6
Honeywell modular automation system acceptance test report
1996-06-14

This document provides the results of the Acceptance Test Procedure for the Honeywell Modular Automation System.

Energy Citations Database

7
Development and Initial Evaluation of an Acceptance Testing ...
1988-09-01

... Title : Development and Initial Evaluation of an Acceptance Testing Procedure for Air Supply and Distribution Systems in New Army Facilities. ...

DTIC Science & Technology

8
Acceptance Test Procedure (ATP) for the SNF canisters sludge depth measurement device
1996-02-02

This document outlines the steps required to properly document the acceptance testing of this prototypical device.

DOE Information Bridge

9
Acceptance test procedure for the overview video camera system (OVS).
1995-01-01

Acceptance Test Procedure for testing the Light Duty Utility Arm (LDUA) Overview Video Camera System (OVS).

National Technical Information Service (NTIS)

10
Acceptance test procedure for the overview video camera system (OVS)
1995-10-01

Acceptance Test Procedure for testing the Light Duty Utility Arm (LDUA) Overview Video Camera System (OVS).

DOE Information Bridge

11
46 CFR 160.062-8 - Procedures for acceptance of testing facility.
2010-10-01

...Procedures for acceptance of testing facility. 160.062-8 Section 160.062-8 Shipping COAST GUARD, DEPARTMENT...Releases. Lifesaving Equipment, Hydraulic and Manual § 160.062-8 Procedures for acceptance of testing...

Code of Federal Regulations, 2010

12
Light duty utility arm phase 2 qualification test procedure
1997-01-16

This Acceptance Test Procedure (ATP) will test and verify that the Exhauster meets the specified functional requirements, safety requirements, operating requirements, and provide a record of the functional test results. The system/functions that will be tested are listed in ...

Energy Citations Database

13
Tank Monitor and Control System sensor Acceptance Test Procedure
1995-09-22

This Acceptance Test Procedure is to verify the correct reading of points connected to the Tank Monitor and Control System (TMACS).

DOE Information Bridge

14
Software acceptance test procedure for surface moisture monitor
1996-01-01

Provides the software acceptance test plan and procedures for software that will perform data acquisition for the surface moisture measurement system.

Energy Citations Database

15
Procedures for Acceptance Testing of Solar Energy Systems.
1984-04-01

... Accession Number : ADA141839. Title : Procedures for Acceptance Testing of Solar Energy Systems. Descriptive Note : Final rept.,. ...

DTIC Science & Technology

16
Acceptance/operational test procedure 103-SY tank camera purge control system
1994-11-01

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 103-SY Camera Purge Control System.

DOE Information Bridge

17
Acceptance test procedure for cathodic protection, rectifier 41
1995-04-01

Acceptance test procedure for Project W-030 Cathodic Protection Installation, 241-AY and 241-AZ Tank Farm Ventilation Upgrade.

DOE Information Bridge

18
Acceptance test procedure for cathodic protection, rectifier 31
1995-04-01

Acceptance test procedure for Project W-030 Cathodic Protection Installation, 241-AY and 241-AZ Tank Farm Ventilation Upgrade.

DOE Information Bridge

19
Acceptance Test Procedures for the SH-2F Helicopter ...
1985-09-16

... Acceptance Test Procedures for the SH-2F Helicopter Weapon System Trainer (Device 2F106) Software Conversion Modification. Revision D. ...

DTIC Science & Technology

20
TMACS Test Procedure TP007: System administration
1994-05-24

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This ...

DOE Information Bridge

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
21
TMACS Test Procedure TP002: Trending
1994-05-31

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This ...

Energy Citations Database

22
TMACS Test Procedure TP002: Trending
1994-08-29

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This ...

DOE Information Bridge

23
TMACS Test Procedure TP001: Alarm Management
1994-05-31

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This ...

DOE Information Bridge

24
Cooperative Investigation of Acceptance Test Methods for Chemical Analysis of Pozzolans for Mahor Oxides.
1964-01-01

The procedure specified in acceptance testing of pozzolans for chemical analysis for major oxides is more involved and most costly than the procedure used for such analyses in the acceptance testing of portland cement. In order to investigate the simplifi...

National Technical Information Service (NTIS)

25
W-025, Acceptance Test Report
1994-12-14

This Acceptance Test Report (ATR) has been prepared to establish field testing procedures to demonstrate that the Electrical/Instrumentation systems function as intended by the design.

Energy Citations Database

26
Automated Acceptance Test Procedures for Wideband ...
1983-09-30

... Descriptors : *Signal generators, *Microwave equipment, Test methods, Central processing units, Acceptance tests, Range(Extremes), Computer ...

DTIC Science & Technology

27
RELIABILITY (PRODUCTION) ASSURANCE TEST ...
1974-08-14

... TEST, ACCEPTANCE TEST PROCEDURE, PART III, RECEIVER- TRANSMITTER COUNTERMEASURES, EQUIPMENT RT-1079/ALQ-126. ...

DTIC Science & Technology

28
Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer.
1994-01-01

This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; lev...

National Technical Information Service (NTIS)

29
EXPONENTIAL LIFE TEST PROCEDURES WHEN THE ...
1966-06-01

... It is shown that the usual acceptance sampling procedures based on mean life generally favor the producer (consumer) in the IFR (DFR) case. ...

DTIC Science & Technology

30
W-087 Acceptance test procedure. Revision 1
1997-06-10

This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

Energy Citations Database

31
Void fraction instrument acceptance test procedure
1994-09-15

This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating ...

Energy Citations Database

32
Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure
1996-09-11

This Acceptance Test Procedure was written to test the Enraf Series 854 Advanced Technology Gauge (ATG) prior to installation in the Tank Farms. The procedure sets various parameters and verifies that the gauge is functional.

Energy Citations Database

33
W-026, transuranic waste (TRU) glovebox acceptance test report.
1998-01-01

On July 18, 1997, the Transuranic (TRU) glovebox was tested using glovebox acceptance test procedure 13021A-86. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limit...

National Technical Information Service (NTIS)

34
Cone penetrometer acceptance test report.
1996-01-01

This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specifi...

National Technical Information Service (NTIS)

35
Cone penetrometer acceptance test report
1996-09-19

This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP ...

Energy Citations Database

36
Acceptance Test Report for the 241-AN-107 Enraf Advanced Technology Gauges
1995-06-01

This Acceptance Test Report covers the results of the execution of the Acceptance Test Procedure for the 241-AN-107 Enraf Advanced Technology Gauges. The test verified the proper operation of the gauges to measure waste density and level in the 241-AN-107 tank.

Energy Citations Database

37
105 K East isolation barrier acceptance analysis report.
1995-01-01

The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KE/100K. The tests were performed in accordance with the test plan (McCracken 1995c) and acceptance test procedure ...

National Technical Information Service (NTIS)

38
Instrumentation acceptance test procedure for 244U DCRT
1994-09-13

The attached Test Procedure provides detailed test steps to assure proper operation of the 244U DCRT instrumentation.

DOE Information Bridge

39
Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid 'K'.
1999-01-01

This test report provides the results from the performance of Acceptance Test Procedure (ATP) HNF-4276, for Pumping and Instrumentation Control (PIC) skid 'K'. The ATP verifies the proper construction of the PIC skid 'K' by Site Fabrication Services along...

National Technical Information Service (NTIS)

40
Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid 'N'.
2000-01-01

This test report provides the results from the performance of Acceptance Test Procedure (ATP) RPP-5489, for Pumping Instrumentation and Control (PIC) skid N. The ATP verifies the proper construction of the PIC skid N by Site Fabrication Services along wit...

National Technical Information Service (NTIS)

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
41
PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report.
1997-01-01

This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the U...

National Technical Information Service (NTIS)

42
Cathodic protection acceptance test procedure.
1994-01-01

This acceptance test procedure is to document testing of added anodes to existing Rectifier No. 11. Anodes were added under Project W-151, Tank 101-AZ Waste Retrieval System.

National Technical Information Service (NTIS)

43
Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N
1999-12-13

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

DOE Information Bridge

44
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W
2000-05-18

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

DOE Information Bridge

45
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V
2000-05-18

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

Energy Citations Database

46
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U
2000-12-05

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

DOE Information Bridge

47
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T
2000-05-18

This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

Energy Citations Database

48
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R
2000-05-11

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

DOE Information Bridge

49
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q
2000-03-27

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

Energy Citations Database

50
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P
2000-03-01

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

DOE Information Bridge

51
Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V
2000-08-14

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

DOE Information Bridge

52
Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L
1999-10-11

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

Energy Citations Database

53
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T
2000-06-20

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

DOE Information Bridge

54
Measurement and Inspection of Gun Tubes.
1991-01-01

This ITOP (International Test Operations and Procedures) describes techniques and procedures for determining internal tube dimensions and other data of gun tubes development and acceptance testing.

National Technical Information Service (NTIS)

55
MIT upgrade acceptance test procedure
1994-11-01

This procedure will test the 17B MIT sensor inputs to the DACS trailer after installation of new thermocouple multiplexers and associated computer software.

Energy Citations Database

56
MIT upgrade acceptance test procedure
1994-10-10

This procedure will test the 17B MIT sensor inputs to the DACS trailer after installation of new thermocouple multiplexers and associated computer software.

Energy Citations Database

57
All Source Analysis System / Enemy Situation Correlation ... - NASA

Chassis Subsystem Functional Test Procedure PCN No. .... ASAS/ENSCE, Text Graphics Monitor Assembly Acceptance (functional) Test Procedure for ...

NASA Website

58
Automated Transportation Management System (ATMS) V2.0 logistics module PBI acceptance criteria.
1995-01-01

This document defines the acceptance criteria for the Automated Transportation Management System V2.0 Logistics Module Performance Based Incentive (PBI). This acceptance criteria will be the primary basis for the generation of acceptance test procedures. ...

National Technical Information Service (NTIS)

59
Acceptance Test Plan for Fourth-Generation Hanford Corrosion Probe Tree Assembly
2000-10-17

This Acceptance Test Procedure (ATP) will document the satisfactory operation of the corrosion probe tree assembly. This ATP will be performed by the manufacturer prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion probe ...

Energy Citations Database

60
TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion
1994-08-29

The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes.

Energy Citations Database

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
61
Light duty utility arm equipment qualification test procedure
1996-07-22

The Equipment Qualification Test described in this test procedure document is the acceptance test procedure (ATP) for the LDUA Baseline System. It verifies that the equipment is complete and in working order, and demonstrates its readiness for being deployed into an actual ...

DOE Information Bridge

62
Acceptance test report for the AN valve pit leak detection and low point drain assembly mock up test procedure.
1999-01-01

This document describes The Performance Mock-up Test Procedure for the Valve Pit Leak Detection and Low Point Drain Assembly Performance Mock-Up Test Procedure.

National Technical Information Service (NTIS)

63
Acceptance test report for the AN valve pit leak detection and low point drain assembly mock up test procedure
1999-07-20

This document describes The Performance Mock-up Test Procedure for the Valve Pit Leak Detection and Low Point Drain Assembly Performance Mock-Up Test Procedure.

Energy Citations Database

64
Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q
2000-05-11

This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

DOE Information Bridge

65
Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P
2000-03-29

This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

Energy Citations Database

66
K West basin isolation barrier leak rate test
1994-10-31

This document establishes the procedure for performing the acceptance test on the two isolation barriers being installed in K West basin. This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation ...

Energy Citations Database

67
Cone penetrometer moisture probe acceptance test report.
1996-01-01

This Acceptance Test Report (ATR) documents the results of WHC-SD-WM-ATP- 146 (Prototype Cone Penetrometer Moisture Probe Acceptance Test Procedure) and WHC-SD-WM-ATP-145 (Cone Penetrometer Moisture Probe Acceptance Test Procedure). ...

National Technical Information Service (NTIS)

68
Determination of a Simplified Analytic/Test Procedure for Panel Product Acceptance.
1982-01-01

Simplified lateral nail tests and analytic aids used in this experiment gave acceptable predictions of wall racking strength for preliminary evaluations of wall construction. Racking strength evaluations to determine acceptability of new panel products cu...

National Technical Information Service (NTIS)

69
Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer
1994-11-16

This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload ...

Energy Citations Database

70
Acceptance test report for the safety class shutdown system
1996-10-17

This document provides the Acceptance Test Report for the successful testing of the Safety Shutdown Circuit. The test was done in accordance with the requirements that were defined in WHC-SD-WM-SCH-003, Interim Stabilization Safety Class Trip Circuit CGI Dedication Criteria. The actual test ...

DOE Information Bridge

71
Void fraction instrument software, Version 1.2: Acceptance test procedure
1995-05-09

This provides the procedures for the void fraction acceptance test software, Version 1.2. The void fraction instrument will collect data to calculate the amount of gas trapped in Tank 101-SY.

DOE Information Bridge

72
Void fraction instrument software, Version 1.1., acceptance test procedure
1995-01-01

Provides the plan and procedures for the acceptance test of changes that result in Version 1.1 of void fraction software. The void fraction instrument measures gas by volume in waste storage tanks.

Energy Citations Database

73
Supervisory Control and Data Acquisition System (SCADA) Substation C3S4 Acceptance Test Procedure
2000-10-17

The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

Energy Citations Database

74
Supervisory Control and Data Acquisition System (SCADA) Substation C3-3 Acceptance Test Procedure
2000-10-17

The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

Energy Citations Database

75
EVALUATION OF TOXICITY TEST PROCEDURE FOR SCREENING TREATABILITY POTENTIAL OF WASTE IN SOIL

A toxicity procedure has been developed and proposed for use in establishing acceptable initial loading rates and detoxification potentials for hazardous industrial waste when combined with soil. Screening test results are used to establish a range of loading rates acceptable for...

EPA Science Inventory

76
Acceptance/operational test procedure 105-AN tank camera purge system and 105-AN video camera system.
1995-01-01

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 105-AN Camera Purge Control System and 105-AN Video Camera System.

National Technical Information Service (NTIS)

77
Acceptance/operational test procedure 105-AN tank camera purge system and 105-AN video camera system
1995-08-01

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 105-AN Camera Purge Control System and 105-AN Video Camera System

DOE Information Bridge

78
Acceptance/operational test procedure 104-AN tank camera purge System and 104-AN video camera system.
1995-01-01

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 104-AN Camera Purge Control System and 104-AN Video Camera System.

National Technical Information Service (NTIS)

79
Acceptance/operational test procedure 104-AN tank camera purge System and 104-AN video camera system
1995-08-01

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 104-AN Camera Purge Control System and 104-AN Video Camera System

DOE Information Bridge

80
Acceptance/operational test procedure 103-AN tank camera purge system and 103-AN video camera system.
1995-01-01

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 103-AN Camera Purge Control System and 103-AN Video Camera System.

National Technical Information Service (NTIS)

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
81
Acceptance/operational test procedure 103-AN tank camera purge system and 103-AN video camera system
1995-09-05

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 103-AN Camera Purge Control System and 103-AN Video Camera System

DOE Information Bridge

82
Acceptance/operational test procedure 101-SY tank camera purge system and in tank color camera video imaging system.
1994-01-01

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 101-SY color camera purge control system and color camera video imaging system.

National Technical Information Service (NTIS)

83
Acceptance/operational test procedure 101-SY tank camera purge system and in tank color camera video imaging system
1994-10-01

This Acceptance/Operational Test Procedure will document the satisfactory operation of the 101-SY color camera purge control system and color camera video imaging system.

DOE Information Bridge

84
Acceptance test procedure for the 340-NT-EX stack upgrades. Project W-337.
1994-01-01

This document provides an Acceptance Test Procedure (ATP) for the project W-337 upgrades to the 340-NT-EX stack, and its associated sampling and monitoring systems.

National Technical Information Service (NTIS)

85
Acceptance test procedure for the 340-NT-EX stack upgrades. Project W-337
1994-12-06

This document provides an Acceptance Test Procedure (ATP) for the project W-337 upgrades to the 340-NT-EX stack, and its associated sampling and monitoring systems.

Energy Citations Database

86
Acceptance Test Procedure for Cathodic Protection, Rectifier 11
1995-04-28

This Acceptance Test Procedure for Project W-030 Cathodic Protection Installation, 241-AY and 241-AZ Tank Farm Ventilation Upgrade, has been prepared to demonstrate that the cathodic protection system functions as required by project criteria.

Energy Citations Database

87
40-22 DRD 1.4.2.1-b

o Lot acceptance test per Ensign Bickford Procedure ATP 0030/2 ... Ensign Bickford Acceptance Test Procedure ATP 0030/2 (PETN-Cord) or ATP 0030/5 (HMX- Cord) ...

NASA Website

88
40-12 DRD 1.4.2.1-b

o Lot acceptance test per Ensign Bickford Procedure ATP 0030/2 ... Ensign Bickford Acceptance Test Procedure ATP 0030/2 (PETN-Cord) or ATP 0030/5 (HMX- Cord) ...

NASA Website

89
27 CFR 5.66 - Comparative advertising.
2011-04-01

...shall meet scientifically accepted procedures. An example of a scientifically accepted procedure is outlined in the Manual on Sensory Testing Methods, ASTM Special Technical Publication 434, published by the American Society for Testing and...

Code of Federal Regulations, 2011

90
Test Procedures for Qualifying Waxes for Use in Explosives.
1974-09-16

... for Desensitized Wax for use in US Navy explosives. Descriptors : *EXPLOSIVES, *QUALIFICATIONS, *WAXES, *DESENSITIZING, ACCEPTANCE ...

DTIC Science & Technology

91
Recommended Acceptance Testing Procedure for Network ...
2005-08-01

... Each beam describes radio frequency emission parameters and (optionally ... model radar systems that involve frequent activation and deactivation of ...

DTIC Science & Technology

92
Test cooling tower performance
1987-12-01

The author explains what is tested under the Cooling Tower Institute's (CTI) acceptance test procedure. The purpose of the CTI test code is to set standards for acceptance of cooling tower performance. It can be done by an independent consultant or a company can ...

Energy Citations Database

93
Tank Monitor and Control System (TMACS) Revision 11.1 Acceptance Test Report
2000-05-15

This document describes the test results for the Revision 11.1 changes tested in the Acceptance Test Procedure on the Tank Monitor and Control System (TMACS).

DOE Information Bridge

94
Acceptance test procedure for project W-112 HVAC testing, adjusting and balancing for 2404 series, 2620 W and 2740 W
1997-01-23

This document is an executive summary of the testing, adjusting and balancing completed for Project W-112 for the HVAC systems. The actual results are document in the Acceptance Test Report.

DOE Information Bridge

95
Acceptance test procedure: RMW Land Disposal Facility Project W-025.
1994-01-01

This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following:...

National Technical Information Service (NTIS)

96
105-KE Isolation Barrier leak rate acceptance test procedure WHC-SD-SNF-ATP-005.
1994-01-01

This document establishes the procedure for performing the acceptance test on the two isolation barriers being installed in K East basin. This acceptance test procedure shall be used to : First establish a basin water loss rate prior to installation of th...

National Technical Information Service (NTIS)

97
Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing
1994-11-21

This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the ...

Energy Citations Database

98
Acceptance test procedure for the MO-293 (1722) 10-wide mobile office
1994-12-28

This Acceptance Test Procedure has been prepared to demonstrate that the Fire Protection System functions as required by project criteria. The test results will be issued as an acceptance test report after all the testing is complete. This facility is ...

DOE Information Bridge

99
Multi-Altitude Transponder. Volume II. Part 5. Test Procedures ...
1967-12-01

... Results of Tests MATS Transponder S/N 3 ... SATELLITES), DISTANCE MEASURING EQUIPMENT, TEST METHODS, ACCEPTABILITY, RELIABILITY ...

DTIC Science & Technology

100
COTS Software/Hardware

Approach &. Generate. Accept Test Plan. Develop Test. Procedures. Dry Run. Test ..... Detailed approach documented in 6A Transition Plan. First Draft : April 28, ...

NASA Website

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
101
Computer-Assisted Data Acceptance. Test Report: Phase 3.
1992-05-26

... Type I, data The objective of these procedures is to reduce the labor requirements of the currently used manual quality assurance (QA) procedures. ...

DTIC Science & Technology

102
Acceptance test procedure for the AP farm temperature display upgrade
1996-10-17

The purpose of this procedure is to document the Westronic Data units function as intended as installed at 241-AP-271 tank farm.

DOE Information Bridge

103
Surface moisture measurement system hardware acceptance test procedure
1996-02-01

The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance ...

DOE Information Bridge

104
Acceptance test report, plutonium finishing plant life safety upgrade.
1994-01-01

This acceptance Test Procedure (ATP) has been prepared to demonstrate that modifications to the Fir Protection systems function as required by project criteria. The ATP will test the Fire Alarm Control Panels, Flow Alarm Pressure Switch, Heat Detectors, S...

National Technical Information Service (NTIS)

105
Rotary mode core sampling service trailer acceptance test plan.
1994-01-01

This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-056 Rev. 2 and ECN 608798. The equipment being tested is a Furniture Type trailer with storage cabinets, lighting and HVAC systems installed. The unit was purchas...

National Technical Information Service (NTIS)

106
Rotary mode core sampling service trailer Acceptance Test Plan.
1994-01-01

This Acceptance Test Procedure (ATP) will document compliance with the requirements of specification WHC-S-056 Rev.2 including ECNs 608798 and 616386. The equipment being tested is a furniture type trailer with storage cabinets, lighting and HVAC systems ...

National Technical Information Service (NTIS)

107
Light duty utility arm phase 2 qualification test procedure.
1997-01-01

This Acceptance Test Procedure (ATP) will test and verify that the Exhauster meets the specified functional requirements, safety requirements, operating requirements, and provide a record of the functional test results. The system/functions that will be t...

National Technical Information Service (NTIS)

108
Acceptance test procedure for High Pressure Water Jet System
1995-05-30

The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. ...

DOE Information Bridge

109
AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)
2000-01-10

Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the ...

DOE Information Bridge

110
Test report - 241-AN-274 Caustic Pump Control Building
1995-05-01

This Acceptance Test Report documents the test results of test procedure WHC-SD-WM-ATP-135 `Acceptance Test Procedure for the 241-AN- 274 Caustic Pump Control Building.` The objective of the test was to verify ...

Energy Citations Database

111
Specific test and evaluation plan
1998-03-20

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design ...

Energy Citations Database

112
Investigation of field test procedures for large fans. Final report
1980-12-01

For quite some time there has been no generally accepted procedure for field testing of large fans of the type commonly used to provide mechanical draft in fossil fired steam generating units. The Performance Test Code Committee Number 11 of the American Society of Mechanical Engineers has been working on the ...

Energy Citations Database

113
Testing of the MFTF magnets
1982-05-05

This paper describes the cooldown and testing of the first yin-yang magnet for the Mirror Fusion Test Facility. The introduction describes the superconducting magnet; the rest of the paper explains the tests prior to and including magnet cooldown and final acceptance testing. The MFTF ...

DOE Information Bridge

114
Stationary Diesel Engine-Generator Set Acceptance Testing Procedures, Methods, and Instructions.
1977-01-01

The Corps of Engineers (CE) Test Procedures document has been prepared in a format similar to the referenced MIL-STD-705B test methods to provide for easy implementation by CE district and division personnel. The procedures provide for acceptance testing ...

National Technical Information Service (NTIS)

115
TMACS test procedure TP009: Acromag driver. Revision 5
1994-09-01

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This ...

DOE Information Bridge

116
TMACS Test Procedure TP008: SACS Interface. Revision 5
1994-05-31

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This ...

DOE Information Bridge

117
TMACS Test Procedure TP009: Acromag Driver
1994-05-31

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This ...

DOE Information Bridge

118
Memorandum : No. 082-M : 04/30/96:Under Secretary of ...

... The modification at Raytheon concerns soldering procedures, engineering changeapproval, acceptance testing, configuration audits, annual test ...

DefenseLINK Web Site

119
Limited Production Precision Runway Monitor (PRM) Master ...
1992-11-01

... is accounted for during the Development Test and Evaluation (DT&E), Production Acceptance Test ... Air Traffic Rules and Procedures Service (ATP) ...

DTIC Science & Technology

120
Memorandum : No. 082-M : 04/30/96:Under Secretary of ...

... concerns soldering procedures, engineering changeapproval, acceptance testing, configuration audits, annual test stationcertification, material ...

DefenseLINK Web Site

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
121
Acceptance test procedure for the 105-KW isolation barrier leak rate.
1995-01-01

This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an ac...

National Technical Information Service (NTIS)

122
16 CFR Table 3 to Part 1512 - Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test...
2009-01-01

...Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test Procedure 3 Table 3 to Part 1512 Commercial...Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test Procedure Observation angle (degrees)...

Code of Federal Regulations, 2010

123
Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N
2000-02-03

This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully ...

Energy Citations Database

124
Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M
1999-12-13

This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully ...

DOE Information Bridge

125
Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L
1999-11-09

This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully ...

DOE Information Bridge

126
Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria
2011-08-01

This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

Energy Citations Database

127
Acceptance test procedure for a portable, self-contained nitrogen supply
1994-10-04

This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was ...

DOE Information Bridge

128
Hose in Hose Transfer Line Qualification and Acceptance Test Plan and Procedure
2001-04-16

This Test Plan and Procedure outlines the methodology used to test the performance of several Hose-in-Hose Transfer Lines used by the River Protection Project's Interim Stabilization Group.

Energy Citations Database

129
Fire alarm system acceptance test procedure for Project W-164, Sample Equipment Cleaning Facility
1995-04-17

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Fire Protection System functions as required by project criteria. The test results will be issued as an acceptance test report (ATR) after all testing is complete. Components ...

Energy Citations Database

130
PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report
1997-10-07

This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as ...

DOE Information Bridge

131
Moving-Map Composers System Version 3.4P Acceptance ...
2004-11-29

... Acceptance Test Procedures (ATP) to be followed during the final test and evaluation of the FiAF (Finnish Air Force) Moving-Map Composer (MMC ...

DTIC Science & Technology

132
Gas characterization system software acceptance test procedure
1996-02-27

This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

DOE Information Bridge

133
Gas characterization system 241-AW-101 field acceptance test procedure
1996-03-01

This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AW-101. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

DOE Information Bridge

134
Gas characterization system 241-AN-105 field acceptance test procedure
1996-03-01

This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AN-105. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

DOE Information Bridge

135
Acceptance test procedures for rotary mode core sampling exhausters.
1995-01-01

Purpose of this ATP is to provide systematic acceptance testing of two rotary mode core sampling exhausters. These exhausters will support core sampling systems three and four. The exhaust gases are monitored for radionuclides, ammonia, and total organics...

National Technical Information Service (NTIS)

136
Acceptance test procedure MICON software exhaust fan control modifications
1999-05-21

This acceptance test verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, and the alarms for the new emergency fan damper backup air compressor.

DOE Information Bridge

137
Acceptance Test Procedure for AMS-4 Continuous Air Monitors (CAM) at 241-AN Exhausters
1999-09-22

This supporting document provides detailed instruction for ensuring the existing alarms and interlocks are in an acceptable condition prior to performing the functional test of the AMS-4 installation.

DOE Information Bridge

138
40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...
2010-07-01

...for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...tested. Ns = Total number of regeneration emission tests. (Subscript...

Code of Federal Regulations, 2010

139
40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...
2009-07-01

...for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...tested. Ns = Total number of regeneration emission tests. (Subscript...

Code of Federal Regulations, 2010

140
Acceptance test plan for the 241-AN-105 multi-function corrosion monitoring system
1999-06-24

This Acceptance Test Procedure (ATP) will document the satisfactory operation of the corrosion probe tree assembly destined for installation into tank 241-AN-105. This ATP will be performed by the manufacturer prior to delivery to the site. The objective of this procedure is to demonstrate and document the ...

Energy Citations Database

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
141
Thermocouple module halt acceptance test report for tank 241-SY-101 DACS-1
1998-03-10

Testing was started on February 24, 1998 and completed on February 25, 1998. The completed procedure consists of 4 acceptance test sections, 6.1 through 6.4. Three test exceptions were identified during the procedure. The first test exception was ...

Energy Citations Database

142
ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure
1999-10-21

The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality.

Energy Citations Database

143
Cone penetrometer moisture probe acceptance test report
1996-04-23

This Acceptance Test Report (ATR) documents the results of WHC-SD-WM-ATP-146 (Prototype Cone Penetrometer Moisture Probe Acceptance Test Procedure) and WHC-SD-WM-ATP-145 (Cone Penetrometer Moisture Probe Acceptance Test Procedure). ...

Energy Citations Database

144
TMACS Test Procedure TP011: Panalarm Interface
1994-05-24

The TMACS Software Test Procedures translate the project`s acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the ...

DOE Information Bridge

145
Automated Transportation Management System (ATMS) V2.0 logistics module PBI acceptance criteria
1995-02-28

This document defines the acceptance criteria for the Automated Transportation Management System V2.0 Logistics Module Performance Based Incentive (PBI). This acceptance criteria will be the primary basis for the generation of acceptance test procedures. The purpose of this document is to ...

Energy Citations Database

146
Q6A Specifications: Test Procedures and Acceptance Criteria for ...

... Examples of these procedures are: Melting point (including hot-stage microscopy), solid state IR, X- ray powder diffraction, thermal analysis procedures (like ...

Center for Drug Evaluation (CDER)

147
Acceptance test report MICON software exhaust fan control
1998-06-12

This test procedure specifies instructions for acceptance testing of software for exhaust fan control under Project ESPT (Energy Savings Performance Contract). The software controls the operation of two emergency exhaust fans when there is a power failure. This report details the results of ...

Energy Citations Database

148
Acceptance Test Report for AMS-4 Continuous Air Monitors (CAM) at 241AN Exhausters
1999-11-11

This report provides the completed copy and test results of the Acceptance Test Procedure (TWR-4713). Test results were actually hand written in the ATP including redline changes. All acceptance criteria steps were completed satisfactorily without exceptions.

DOE Information Bridge

149
WRAP low level waste (LLW) glovebox acceptance test report.
1998-01-01

In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. L...

National Technical Information Service (NTIS)

150
Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer
2000-01-27

This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ...

Energy Citations Database

151
ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure
1999-08-17

This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm ...

Energy Citations Database

152
Diesel generator trailer acceptance test procedure
1994-09-23

This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was ...

Energy Citations Database

153
Operator coil monitoring acceptance test procedure.
1995-01-01

The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. I...

National Technical Information Service (NTIS)

154
Operator coil monitoring Acceptance Test Procedure.
1995-01-01

The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. I...

National Technical Information Service (NTIS)

155
Acceptance test procedure for tank bottom thermocouples on Tank 241-SY-101. Revision 2
1994-10-25

This ECN incorporates a complete procedure revision for testing the re-installation of a temporary Data Logger which is to be installed in support of upcoming mixer pump excavation runs.

Energy Citations Database

156
Cone penetrometer moisture probe acceptance test procedure
1996-01-01

This report describes the procedure to be used for acceptance testing of the Cone Penetrometer Moisture Probe (CPMP) system. The system includes the probe and detectors, the winch system, the NIM bin electronics, the thermistor, the laptop computer, Input/Output (I/O) interfaces, LabVIEW` application with automatic scanning features ...

DOE Information Bridge

157
Operability test report for core sample truck {number_sign}1 flammable gas modifications
1997-09-15

This report primarily consists of the original test procedure used for the Operability Testing of the flammable gas modifications to Core Sample Truck No. One. Included are exceptions, resolutions, comments, and test results. This report consists of the original, completed, test ...

DOE Information Bridge

158
TEST METHODS FOR DETERMINING THE CHEMICAL WASTE COMPATIBILITY OF SYNTHETIC LINERS

A search was made for test methods for the chemical resistance of membrane liners (geomembranes). Disclosed methods and procedures were examined and compared. Two tests being promoted for general acceptance are NSF Standard No. 54 (a voluntary industry-generated test) and the pro...

EPA Science Inventory

159
PDSS/IMC Qualification Test Software Acceptance Procedures.
1984-01-01

Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

National Technical Information Service (NTIS)

160
Acceptance Tests of Arkon Products, Inc., Type a Foam.
1966-01-01

A test is presented for compliance with Subpart 164.015. Specification for Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape. The foam tested was Type A sheet form. A description is given of the test procedures used and the results of the individ...

National Technical Information Service (NTIS)

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
161
Acceptance test report for core sample trucks 3 and 4
1996-04-10

The purpose of this Acceptance Test Report is to provide documentation for the acceptance testing of the rotary mode core sample trucks 3 and 4, designated as HO-68K-4600 and HO-68K-4647, respectively. This report conforms to the guidelines established in WHC-IP-1026, ``Engineering Practice Guidelines,`` Appendix ...

DOE Information Bridge

162
Tank Monitoring and Control System (TMACS) Acceptance Test Procedure
2000-12-14

This document is used to validate Revision 13.0 of the Tank Monitor and Control System (TMACS) and verify it functions as intended by design.

Energy Citations Database

163
Tank Monitoring and Control System (TMACS) Acceptance Test Procedure
1999-06-30

This document is used to validate Revision 11.1 of the Tank Monitor and Control System (TMACS) and verify its functions as intended by design.

DOE Information Bridge

164
Tank Monitoring and Control Sys (TMACS) Acceptance Test Procedure
1999-07-06

This document is used to validate Revision 11.1 of the Tank Monitor and Control System (TMACS) and verify its functions as intended by design.

Energy Citations Database

165
SSVEO IFA List

Feb 27, 2003 ... A review of the acceptance test procedure (ATP) and previous flight ..... a leak in the epoxy in the Torr seal around its vacuum gauge tube. ...

NASA Website

166
SITE ACCEPTANCE TEST PROCEDURES WHITEMAN AFB
1963-05-20

... 555 PRECISION DC VOLTAGE STANDARD 559 400-CYCLE OSCILLATOR 560 AC - DC CONVERTER 565 TRUCK, HAND, AUTONAVIGATOR ...

DTIC Science & Technology

167
Hydraulic System Noise Study.
1973-01-01

The purpose of the OSU-MERDC Hydraulic Specification Program is to develop industrially acceptable test procedures and requirement specifications relative to the performance of hydraulic components and systems to facilitate the military's 'buy commericial...

National Technical Information Service (NTIS)

168
Hydraulic Specification Program on Phase 2.
1971-01-01

The purpose of the OSU-MERDC hydraulics specification program is to develop industrially acceptable test procedures and requirement specifications relative to the performance of hydraulic components and systems to facilitate the military's 'buy commercial...

National Technical Information Service (NTIS)

169
Diagnostic Procedures for the Royal Australian Navy Side ...
1993-09-01

... acceptable test signals for the evaluation and fault finding analysis of the Info Express Sonar Imaging and Data Acquisition (SIDA) system and, in ...

DTIC Science & Technology

170
BCE selector valves and flow proportional sampler
1994-09-30

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Electrical/Instrumentation systems for the BCE function as required by project criteria.

DOE Information Bridge

171
Acceptance test procedure for Project W-430, SY-tank farm cathodic protection upgrade, Rectifier {number_sign}36
1995-12-01

This document is prepared to demonstrate that the cathodic protection system functions as intended by the design.

DOE Information Bridge

172
ACCEPTANCE TEST PROCEDURES FOR THE NAVIGATION ...
1967-02-19

... Corporate Author : LEAR SIEGLER INC GRAND RAPIDS MICH INSTRUMENT DIV. Personal Author(s) : Ramsey,JE. Report Date : 19 FEB 1967. ...

DTIC Science & Technology

173
Test identifies acidizing-fluid/crude compatibility problems
1994-03-28

A testing procedure evaluated in the Gulf of Mexico indicates more accurately the downhole performance of acid additives. Acid treatments designed with this method can prevent facility upsets and increase the production from acidized wells. The current industry accepted API RP 42 testing ...

Energy Citations Database

174
Packing procedure for shipment of PETN pellets. Final report, October 1975
1975-01-01

Three ''detonation tests'' and one ''burn test'' were performed on an AN can, Type AN 8024, containing PETN pellets. Test procedures were discussed with a representative of the Department of Transportation. The can contained all reactions and ...

Energy Citations Database

175
TMACS test procedure TP010: Integration summary. Revision 6
1994-09-01

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This ...

DOE Information Bridge

176
Solid-State Radar Beacon Decoder (SSRBD Operational Test and Evaluation (OT/E)/integration test procedures
1992-01-01

The Solid State Radar Beacon Decoder (SSRBD) operational and integration test procedures are defined; they will be conducted at the FAA operational facilities. These procedures will be executed following the contractor site acceptance test. Each SSRBD test configuration is ...

NASA Astrophysics Data System (ADS)

177
241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)
2000-03-01

Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data ...

Energy Citations Database

178
241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)
2000-01-27

Shop test of the sludge mobilization cart system to be used in the AZ-101 Mixer Pump Demonstration Test Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including depth indicators, speed controls, interface ...

Energy Citations Database

179
Honeywell Modular Automation System Acceptance Test Procedure
1999-09-21

The purpose of this Acceptance Test Procedure (ATP) is to verify the operability of the three new furnaces as controlled by the new Honeywell Modular Automation System (MAS). The Honeywell MAS is being installed in PFP to control the three thermal stabilization furnaces in glovebox HA-211. The ATP provides instructions for ...

Energy Citations Database

180
Moving-Map Composers System Version 3.4P Acceptance ...
2002-07-29

... Title : Moving-Map Composers System Version 3.4P Acceptance Test Procedures Developed for the Finnish Air Force. Descriptive ...

DTIC Science & Technology

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page
 
181
PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure
1997-09-01

This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply ...

DOE Information Bridge

182
Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3
1995-05-08

This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer`s instructions and specifications and is properly setup prior to being delivered to the tank farm area.

DOE Information Bridge

183
Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M
1999-11-09

This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at ...

DOE Information Bridge

184
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V
2000-07-25

This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at ...

DOE Information Bridge

185
Acceptance test procedure for the L-070 project mechanical equipment and instrumentation
1996-04-19

This document contains the acceptance test procedure for the mechanical equipment and instrumentation installed per the L-070 Project. The specific system to be tested are the pump controls for the 3906 Lift Station and 350-A Lift Station. In addition, verification that signals are being received by the 300 Area ...

DOE Information Bridge

186
Breathing air trailer acceptance test procedure
1994-09-14

This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0251 Rev. 0 and ECNs 613530 and 606113. The equipment being tested is a Breathing Air Supply Trailer purchased as a Design and Fabrication procurement activity for use in the core sampling program. The ATP was written by ...

Energy Citations Database

187
Acceptance/Operational Test Report for Tank 241-AN-104 camera and camera purge control system
1995-11-01

This Acceptance/Operational Test Procedure (ATP/OTP) will document the satisfactory operation of the camera purge panel, purge control panel, color camera system and associated control components destined for installation. The final acceptance of the complete system will be performed in the field. The purge panel ...

DOE Information Bridge

188
C-106 tank process ventilation test.
1998-01-01

Project W-320 Acceptance Test Report for tank 241-C-106, 296-C-006 Ventilation System Acceptance Test Procedure (ATP) HNF-SD-W320-012, C-106 Tank Process Ventilation Test, was an in depth test of the 296-C-006 ventilation system and ventilation support ...

National Technical Information Service (NTIS)

189
242-A MCS Logic Acceptance Test Report for Year 2000 Upgrade
1999-08-31

242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. Testing was performed per test procedure HNF-3568. There were no unresolved exceptions. The system responded correctly to all testing and meets the requirements to operate the 242-A This report documents the ...

Energy Citations Database

190
Maraging Steel Propellant Storability Test Tank.
1969-01-01

This report summarizes the work performed in designing, fabricating, and acceptance testing small-scale storable propellant tanks. The design incorporates full-scale missile tank features and typical weld stresses. Fabrication and test procedures are base...

National Technical Information Service (NTIS)

191
FR/GE/UK/US Tank Cannon and Recoil Mechanism.
1992-01-01

This ITOP describes procedures for conducting tests to evaluate the performance of tank cannon and hydropneumatic recoil mechanisms. This ITOP does not cover production acceptance tests, cannon safety tests (See ITOP 3-2-829), or cannon accessories such a...

National Technical Information Service (NTIS)

192
Evaluation Test of a Small Harbor Oil Spill Retrieval Systems.
1974-01-01

An evaluation test was conducted to obtain performance data and develop an acceptance test procedure for a small oil spill retrieval system requiring no more than two men for its deployment and operation. It was found that the use of a simple, floating gr...

National Technical Information Service (NTIS)

193
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q
2000-02-14

This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

Energy Citations Database

194
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P
2000-02-14

This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

Energy Citations Database

195
32 CFR 634.35 - Chemical testing policies and procedures.
2011-07-01

...following circumstances: (1) Blood, urine, or other bodily substances are tested using generally accepted scientific and medical methods and standards. (2) Breath tests are administered by qualified personnel (§ 634.33)....

Code of Federal Regulations, 2011

196
32 CFR 634.35 - Chemical testing policies and procedures.
2010-07-01

...following circumstances: (1) Blood, urine, or other bodily substances are tested using generally accepted scientific and medical methods and standards. (2) Breath tests are administered by qualified personnel (§ 634.33)....

Code of Federal Regulations, 2010

First Page Previous Page 1 2 3 4 5 6 7 8 9 10 Next Page Last Page