Main View
This view is used for searching all possible sources.
First Page Previous Page 1 2 3 4 Next Page Last Page
 
1
Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2003.
2004-01-01

Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed ...

National Technical Information Service (NTIS)

2
Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2002.
2003-01-01

Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed ...

National Technical Information Service (NTIS)

3
Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2004 Annual Report.
2005-07-01

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) ...

DOE Information Bridge

4
Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2002.
2003-01-01

Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing ...

DOE Information Bridge

5
Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2003 Annual Report.
2005-07-01

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) ...

DOE Information Bridge

6
Fall Chinook Aclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2001.
2004-01-01

Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing ...

Energy Citations Database

7
Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2003.
2004-01-01

Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing ...

Energy Citations Database

8
Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 1999 Annual Report.
2005-07-01

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project (FCAP) ...

DOE Information Bridge

9
Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2001 Annual Report.
2005-07-01

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites ...

DOE Information Bridge

10
Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2000 Annual Report.
2005-07-01

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites ...

DOE Information Bridge

11
Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2002 Annual Report.
2005-07-01

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery reared yearling fall Chinook salmon Oncorhynchus tshawytscha that were acclimated and released at three Fall Chinook Acclimation Project sites ...

DOE Information Bridge

12
The First Year. Industrial Manpower Center - Pittsburg-Antioch, California.
1970-01-01

The purpose of the project was to refine the procedures and test the efficacy of a comprehensive basic education and human resource development center which provided employability preparation (other than skill training) with heavy involvement of local bus...

National Technical Information Service (NTIS)

13
Solvent Refined Coal (SRC) Process. Quarterly Technical Progress Report, January--March 1977.
1977-01-01

The progress of the Solvent Refined Coal (SRC) Project by The Pittsburg and Midway Coal Mining Co. for the Energy Research and Development Administration for the period January 1, 1977 to March 31, 1977 is summarized. Activities include the operation and ...

National Technical Information Service (NTIS)

14
Solvent Refined Coal (SRC) Process.
1980-01-01

This report summarizes the progress of the Solvent Refined Coal (SRC) project by The Pittsburg and Midway Coal Mining Co. at the SRC Pilot Plant in Fort Lewis, Washington and the Gulf Science and Technology Company Process Development Unit (P-99) in Harma...

National Technical Information Service (NTIS)

15
April 13, 2006 - The Marshall Star - NASA

Apr 13, 2006 ... while the Pittsburg State University team won a free trip to a space ..... planning mode with the programs and projects. This office has ... Fly fishing, hiking with his son, spending time in ...

NASA Website

16
Technology for All: Pittsburg State Adds TE to General Curriculum
2006-01-01

In the fall of 1997, Pittsburg State University (PSU), Pittsburg, Kansas, held ribbon-cutting ceremonies on two major campus projects. The event that received the most media attention was the dedication of the University's $30 million Kansas Technology Center (KTC). The 260,000 square foot KTC would serve as the new home of the ...

ERIC Educational Resources Information Center

17
SRC-II Demonstration Project. Phase Zero, Task Number 15: Deliverable Number 12. Volume 2. Plan and Estimated Cost for Phases I, II and III: Project Management Plan.
1979-01-01

The Project Management Plan (PMP) describes procedures The Pittsburg and Midway Coal Mining Co. (P and M), (a wholly owned subsidiary of the Gulf Oil Corporation acting through Gulf Mineral Resources Co. (GMRC)), will use to manage the design, constructio...

National Technical Information Service (NTIS)

18
Monitoring and Evaluation of Yearling Fall Chinook Salmon Released from Acclimation Facilities Upstream of Lower Granite Dam; 1998 Annual Report.
2004-01-01

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery (Snake River stock) yearling fall chinook salmon that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of ...

Energy Citations Database

19
The Pittsburg Pebbles PDA Project

The Pebbles Project at Carnegie Mellon University is working to create new technologies and applications for personal digital assistants (PDAs). Many avenues of investigation are being explored, including networking and synchronizing multiple PDAs, using handheld devices in classrooms and in conjunction with a fixed computer, and integrating assistant technologies into ...

NSDL National Science Digital Library

20
Solvent Refined Coal (SRC) process. Annual report, 1976
1977-05-01

This report summarizes the progress of the Solvent Refined Coal (SRC) Project by the Pittsburg and Midway Coal Mining Co. for the Energy Research and Development Administration for the period January 1, 1976, to December 31, 1976, with special emphasis on the fourth quarter of 1976. Activities include the operation of the Solvent Refined Coal (SRC) Pilot ...

Energy Citations Database

First Page Previous Page 1 2 3 4 Next Page Last Page
 
First Page Previous Page 1 2 3 4 Next Page Last Page
 
21
Solvent Refined Coal (SRC) Process. Quarterly Technical Progress Report, July 1979-September 1979.
1980-01-01

This report summarizes the progress of the Solvent Refined Coal project by the Pittsburg and Midway Coal Mining Co. for the Department of Energy for the period June 25, 1979 through September 30, 1979. Except for brief periods, the Fort Lewis Pilot Plant ...

National Technical Information Service (NTIS)

22
Solvent Refined Coal (SRC) Process. Quarterly Technical Progress Report, July 1-September 30, 1978.
1978-01-01

This report summarizes the progress of the Solvent Refined Coal (SRC) project by The Pittsburg and Midway Coal Mining Co. for the Department of Energy for the period July 1, 1978 through September 30, 1978. Major activities at the Fort Lewis Pilot Plant i...

National Technical Information Service (NTIS)

23
Solvent Refined Coal (SRC) Process. Quarterly Technical Progress Report, April 1, 1978--June 30, 1978.
1979-01-01

This report summarizes the progress of the Solvent Refined Coal (SRC) project by The Pittsburg and Midway Coal Mining Co. for the Department of Energy for the period April 1, 1978 through June 30, 1978. Major activities at the pilot plant included a sched...

National Technical Information Service (NTIS)

24
Research on Solvent Refined Coal. Quarterly Technical Progress Report, January 1, 1981-March 31, 1981.
1981-01-01

This report summarizes progress on the Research on Solvent Refined Coal project by the Pittsburg and Midway Coal Mining Co.'s Merriam Laboratory during the first quarter of 1981. Pittsburgh seam coals from the Powhatan No. 3, Powhatan No. 6, McElroy, Robi...

National Technical Information Service (NTIS)

25
Photos - Marshall Space Flight Center

A team from Pittsburg High School in Pittsburg, Kan., rumbled through "lunar" terrain to win the high school division of the Great Moonbuggy Race. ...

NASA Website

26
Kansas Team Triumphs in College Division of NASA's 8th Annual "Great

Apr 7, 2001 ... A team from Pittsburg State University in Pittsburg, Kan., ... North Dakota State University in Fargo; Rochester Institute of Technology in ...

NASA Website

27
Effects of Acclimation on the Survival of Spring Chinook Salmon: Annual Report 1992.
1993-07-01

The goal of this project was to determine if acclimation of spring chinook smolts in ambient temperature surface water prior to release will increase survival (smolt-to-adult) compared to smolts raised only in constant temperature spring water.

DOE Information Bridge

28
Effects of Acclimation on the Survival of Spring Chinook Salmon : Annual Report 1993.
1994-05-01

The goal of this project was to determine if acclimation of spring chinook smolts in ambient temperature surface water prior to release will increase survival (smolt-to-adult) compared to smolts raised only in constant temperature sprint water.

DOE Information Bridge

29
Down on the farm
2000-01-01

The U.S. Department of Energy (DOE) on August 17 put money down on one of these energy sector innovations, with $8 million in funding over the next 3 years for a dozen projects to encourage the U.S. bio-based products industry. The agency will fund 6 graduate-level university programs to support training in bio-based products.In addition, 6 research and development ...

NASA Astrophysics Data System (ADS)

30
Pittsburg and Midway at 100: growing profit and productivity
1985-10-01

The author discusses the profitable operation of Pittsburg and Midway Coal Company which ranks 15th among producers. A lean management structure, highly motivated mine managers, and good reserves have contributed to P and M's success.

Energy Citations Database

31
Construction of Wastewater Facilities, Pittsburg, Texas. WPC-Tex-722.
1972-01-01

The proposed action consists of federal grant assistance for the City of Pittsburg, Camp County, Texas to aid in upgrading its existing wastewater treatment plant, constructing a second treatment plant, and constructing interceptors. Along with the enviro...

National Technical Information Service (NTIS)

32
Modified 43XX Steels for High Toughness
1980-04-01

... Consequently, a new ingot was cast and ESR processed. ... on Electroslag Consumable Electrode Remelting and Casting Tech, Pittsburg ...

DTIC Science & Technology

33
Investigation of the Generator Rotor Burst at the Pittsburg ...
1957-11-25

... GENERATORS, *ROTORS, TEST AND EVALUATION, TURBINES, AUXILIARY POWER PLANTS, SPEED REGULATORS, BURSTING STRENGTH ...

DTIC Science & Technology

34
Transit Expressway report: condensation of the report on testing and evaluation. Summary report of Phase 1
1967-02-20

Under sponsorship of Port Authority of Allegany County, Pennsylvania, the Transit Expressway was constructed and evaluated through an experimental research and development project. The full-scale test facility is in South Park, Allegany, County, Pa., 11 miles from Pittsburg CBD. The all electric vehicles resemble buses and run on four pairs of driven ...

Energy Citations Database

35
Railroad energy study: description of rail transportation in the United States. Volume II: rail-passenger transportation
1977-01-01

The rail passenger transportation study addresses the intercity and suburban passenger transport by the railroad industry, and the heavy- and light-rail operations of urban transit. The objective of the project is to present a physical and operational description of rail transportation leading to economic models or other analytical tools to identify and assess the costs and ...

Energy Citations Database

36
Muscle Water and Electrolyte Balance During Chronic Exposure and Work in the Heat.
1985-01-01

In an effort to assess the effect of acute exercise and heat acclimation on muscle metabolism and electrolyte balance, three projects were conducted. The first investigation (Project I) was reported earlier (Annual Report, April 30, 1984) and demonstrated...

National Technical Information Service (NTIS)

37
Operation, Maintenance, and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1987 Annual Report.
1988-12-01

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of ...

DOE Information Bridge

38
Operation, Maintenance and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1988 Annual Report.
1989-12-01

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of ...

Energy Citations Database

39
Functional identification of a blueberry CBF/DREB-like element associated with cold acclimation and freezing tolerance

Highbush blueberry (Vaccinium corymbosum L.) is susceptible to winter freezing injury and frost damage in the spring. As part of an ongoing project to understand the process of cold acclimation, we isolated a CBF/DREB-like (C-repeat binding factor/dehydration-responsive element binding protein) gene...

Technology Transfer Automated Retrieval System (TEKTRAN)

40
Effects of freezing and cold acclimation on the plasma membrane of isolated protoplasts.
1990-01-01

The goals of this project are to provide a mechanistic understanding of freeze/dehydration induced mesomorphic phase transitions if the plasma membrane of winter cereals. Topics discussed include freezing tolerance, hydration characteristics of plasma mem...

National Technical Information Service (NTIS)

First Page Previous Page 1 2 3 4 Next Page Last Page
 
First Page Previous Page 1 2 3 4 Next Page Last Page
 
41
Effects of Freezing and Cold Acclimation on the Plasma Membrane of Isolated Protoplasts: Progress Report, May 16, 1987-January 4, 1988.
1988-01-01

The goals of this project are to provide a mechanistic understanding of freeze dehydration-induced mesonmorphic phase transitions in the plasma membrane of winter cereals that are manifested as alterations in the ultrastructure (lateral phase separations,...

National Technical Information Service (NTIS)

42
EFFECT OF STARVATION ON THE PERFORMANCE AND RE-ACCLIMATION OF BIOTRICKLING FILTERS FOR AIR POLLUTION CONTROL. (R825392)

The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...

EPA Science Inventory

43
Photosynthetic acclimation to elevated CO/sub 2/: Project status report
1989-07-01

The objectives of the first year of this project were to install Sunbrella Lighting Systems into Phytotron 'C' chambers; to assemble a gas exchange system for measurement of photosynthetic parameters under controlled conditions; to work out methods of sample handling and measurement of protein, chorophyll, initial and activated RuBP Carboxylase activity and ...

Energy Citations Database

44
Efficient rooting and acclimation of micropropagated Ruppia maritima Loisel.
1998-08-01

An efficient protocol for rooting and acclimation of in vitro propagated Ruppia maritima was the focus of this research. The effects of four dilutions of a nutrient medium (f) and four different concentrations of sodium bicarbonate on rooting production were investigated. The optimal rooting medium was determined to be f/2 with 0.25 mM sodium bicarbonate in 5 ppt synthetic ...

PubMed

45
Successful application of carbon/oxygen logging to coalbed exploration
1983-02-01

Two primary objectives of TRW's involvement as integrating contractor for the U.S. DOE's Methane Recovery from Coalbeds Project (MRCP) are (1) to demonstrate that this unconventional methane resource can be characterized and (2) to select target sites with the greatest production potential. It was contemplated that the wireline carbon/oxygen (C/O) logging ...

Energy Citations Database

46
Utilization of Ammelide (By-Product from Guanidine Nitrate ...
1975-12-01

... solids from the manufacture of guanidine nitrate by the Pittsburg Coke Process, comprising 48% ammelide, 24% ammeline, 23% melamine, and 5 ...

DTIC Science & Technology

47
Units Data MayAte

... Pittsburg CA Army National Guard 6 250th Transportation Company (Medium Truck) ... 647th Transportation Company (Medium Truck) ...

DefenseLINK Web Site

48
Unit Data Oct 1692

... Pittsburg CA Army National Guard 6 250th Transportation Company (Medium Truck) El Monte CA Army Reserve 157 380th ...

DefenseLINK Web Site

49
National Program for Inspection of Non-Federal Dams. ...
1981-08-01

... Federal Dams. Murphy Dam (NH 00185), Connecticut River Basin, Pittsburg, New Hampshire. Phase I Inspection Report. ...

DTIC Science & Technology

50
National Program for Inspection of Non-Federal Dam. First ...
1979-05-01

... First Connecticut Lake Dam (NH 00186), NHWRB 194.02, Connecticut River Basin, Pittsburg, New Hampshire. Phase I Inspection Report. ...

DTIC Science & Technology

51
NASA - Education Weekly Activity Report (WAR)

Apr 17, 2007... Best Design and Most Improved was awarded to Pittsburg State University, Crash and Burn was awarded to Carleton University (Ottawa, ...

NASA Website

52
Investigation of the Generator Rotor Burst at the Pittsburg ...
1957-11-25

... This is consistent with the V-notch Charpy tests on material ... we had found achange in the sonic - test results after ... and we had re- r j. tested 17 rotors ...

DTIC Science & Technology

53
FACILITIES AVAILABILITY AND REQUIREMENTS FOR ...
1961-09-01

... There are several steel companies that are capable of producing Ladish D6aC steel billets: Crucible Steel Co of America, Pittsburg, Pa. ; Republic ...

DTIC Science & Technology

54
Effects of Shoot Apex Removal and Fruit Herbivory on Branching, Biomass and Reproduction in Verbascum thapsus ...

... crispus L., Potentilla recta L., Trifolium spp. and Vicia cracca L.) were present on this site. (2) Pittsburg ... ...

NBII National Biological Information Infrastructure

55
Decision Support�Oriented Selection of Remediation Technologies to Rehabilitate Contaminated Sites

... L. 2000. Fundamentals of decision making and priority theory with the analytic hierarchy process Pittsburg (PA): RWS. p. 477. Triantaphyllou, E. ... ...

NBII National Biological Information Infrastructure

56
Minthorn Springs Creek Summer Juvenile Release and Adult Collection Facility; 1993 Annual Report.
1994-05-01

The Confederated Tribes of the Umatilla Indian Reservation (CT'UIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to supplement steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding and spawning adult steelhead ...

Energy Citations Database

57
Solvent refined coal (SRC) process. Quarterly technical progress report, April 1, 1978--June 30, 1978
1979-05-01

This report summarizes the progress of the Solvent Refined Coal (SRC) project by The Pittsburg and Midway Coal Mining Co. for the Department of Energy for the period April 1, 1978 through June 30, 1978. Major activities at the pilot plant included a scheduled plant turnaround and the blending of 4,500 barrels of SRC II fuel oil for use in a large-scale ...

Energy Citations Database

58
Research on solvent-refined coal. Quarterly technical progress report, July 1-September 30, 1981
1982-07-01

This report describes progress on the Research on Solvent Refined Coal project by The Pittsburg and Midway Coal Mining Company's Merriam Laboratory during the third quarter of 1981. A four-part experiment was conducted with subbituminous Edna coal, pyrite and/or bituminous Ireland coal at 457/sup 0/C and 1800 psig or 450/sup 0/C and 2250 psig. The ...

Energy Citations Database

59
Addressing Barriers to Engineering Students While Engaging the Broader Issues of Engineering Education
2007-05-01

The Hewlett ESWI project at New Mexico State University (NMSU) includes two new program activities: the summer Pre-College Experiences in Science, Mathematics, and Engineering (PREP) and the freshman engineering learning community cluster. As a first step, the PREP program hosted 122, 6th thru 11th grade students during the 2003 eight week summer bridge. These students, who ...

NSDL National Science Digital Library

60
2010-11 Missouri S&T Miner Basketball Game Notes

at William Jewell .........................L, 67-72 28 PITTSBURG STATE ..................L, 61-64 December 2.m. Friday, Dec. 17 Maryville at William Jewell: Blackburn (21-15), Missouri Baptist (30-11), Southwest Baptist (21-17), William Jewell (25- 13), Pittsburg

E-print Network

First Page Previous Page 1 2 3 4 Next Page Last Page
 
First Page Previous Page 1 2 3 4 Next Page Last Page
 
61
Agreement between Pittsburg State University/Kansas National Education Association and Pittsburg State University, July 1, 1985-June 30, 1986.
1984-07-01

The collective bargaining agreement between Pittsburg State University (Kansas) and the Pittsburg State University Chapter (218 members) of the National Education Association covering the period July 1, 1985-June 30, 1986 is presented. Items covered in the agreement include: salaries, performance appraisal, allocation of annual faculty salary increments, ...

ERIC Educational Resources Information Center

62
Acclimation and Degradation of Petrochemical Wastewater ...
1978-05-10

... Accession Number : ADD419117. Title : Acclimation and Degradation of Petrochemical Wastewater Components by Methane Fermentation,. ...

DTIC Science & Technology

63
Implications of plant acclimation for future climate-carbon cycle feedbacks
2010-05-01

The response of land ecosystems to climate change and associated feedbacks are a key uncertainty in future climate prediction (Friedlingstein et al. 2006). However global models generally do not account for the acclimation of plant physiological processes to increased temperatures. Here we conduct a first global sensitivity study whereby we modify the Joint UK land ...

NASA Astrophysics Data System (ADS)

64
ecas.rdf - the EDRN Informatics Center

University of Pittsburg Pancreatic Data TBD 1R01 CA098642-01A1/CA/NCI R03 CA102888/CA/NCI Early detection of pancreatic cancer might improve clinical ...

NASA Website

65
Unit-Operation Performance, Fort Lewis Pilot Plant. Report for the Technical Data Analysis Program.
1983-01-01

This report reviews the operating performance of selected areas of the Fort Lewis, Washington Solvent Refined Coal (SRC) Pilot Plant. This facility was operated by The Pittsburg and Midway Coal Mining Co. for the US Department of Energy. Initial operation...

National Technical Information Service (NTIS)

66
NASA - Pittsburg State University Cruises to Victory in College ...

Apr 8, 2006 ... Search Marshall ... The award for "Best Engineering Design" in the college division went to the team from Middle Tennessee State ... Other college racers included Alabama A&M University in Huntsville; Southern Illinois ...

NASA Website

67
Marshall Center Space News Release 02-047 (03-07-02)

The Pittsburg, Kan., State University team wins the college division at last year's ... wide range of skills as a team to design, engineer and build their vehicle. ... manager of the education programs department at the Marshall Center . ...

NASA Website

68
Late Holocene Prehistory of the Dyer Site (34PS96) TI Valley, Oklahoma.
1982-01-01

This volume contains the summary report of the archaeological and paleoecological investigations at the Dyer Site (34PS96) in the Ti Valley, Oklahoma. The Dyer Site is located in the southeast portion of Pittsburg County, Oklahoma. The objective of the mi...

National Technical Information Service (NTIS)

69
EntErtainmEnt Check the Pittsburg City Paper for current happenings and events around town. There are several drop-off points

-521-7550 Brusters, 4070 Beechwood Boulevard, Greenfield, 412-422-9555 Cold Stone Creamery, 5800 Forbes Avenue

E-print Network

70
Chemical & Petroleum Engineering: ABET Self-Study Report (2005) from University of Pittsburg
2005-06-01

Chemical and Petroleum Engineering department has an active undergraduate committee that incorporates ABET accreditation needs into its curriculum. The department utilizes various assessment tools to evaluate how program and class objectives are realized.

NSDL National Science Digital Library

First Page Previous Page 1 2 3 4 Next Page Last Page