Sample records for acquisition planning describing

  1. AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

    NASA Technical Reports Server (NTRS)

    Hanley, Lionel

    1989-01-01

    A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.

  2. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  3. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  4. Acoustic window planning for ultrasound acquisition.

    PubMed

    Göbl, Rüdiger; Virga, Salvatore; Rackerseder, Julia; Frisch, Benjamin; Navab, Nassir; Hennersperger, Christoph

    2017-06-01

    Autonomous robotic ultrasound has recently gained considerable interest, especially for collaborative applications. Existing methods for acquisition trajectory planning are solely based on geometrical considerations, such as the pose of the transducer with respect to the patient surface. This work aims at establishing acoustic window planning to enable autonomous ultrasound acquisitions of anatomies with restricted acoustic windows, such as the liver or the heart. We propose a fully automatic approach for the planning of acquisition trajectories, which only requires information about the target region as well as existing tomographic imaging data, such as X-ray computed tomography. The framework integrates both geometrical and physics-based constraints to estimate the best ultrasound acquisition trajectories with respect to the available acoustic windows. We evaluate the developed method using virtual planning scenarios based on real patient data as well as for real robotic ultrasound acquisitions on a tissue-mimicking phantom. The proposed method yields superior image quality in comparison with a naive planning approach, while maintaining the necessary coverage of the target. We demonstrate that by taking image formation properties into account acquisition planning methods can outperform naive plannings. Furthermore, we show the need for such planning techniques, since naive approaches are not sufficient as they do not take the expected image quality into account.

  5. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...

  6. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...

  7. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...

  8. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...

  9. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... procedures, the contracting officer or the acquisition team, as appropriate, must conduct market research to..., briefing materials shall be presented to address the acquisition plan topics and structure in FAR 7.105...

  10. Automating Acquisitions: The Planning Process.

    ERIC Educational Resources Information Center

    Bryant, Bonita

    1984-01-01

    Account of process followed at large academic library in preparing for automation of acquisition and fund accounting functions highlights planning criteria, local goals, planning process elements (selecting participants, assigning tasks, devising timetable, providing foundations, evaluating systems, determining costs, formulating recommendations).…

  11. Planning the Implementation of an Integrated On-line Acquisitions System.

    ERIC Educational Resources Information Center

    Baldwin, Paul E.

    1984-01-01

    Discusses need to consider political context of decision-making process and describes how cost data were presented to obtain management approval for implementation planning for integrated online acquisitions and fund accounting system involving Simon Fraser University, University of British Columbia, and University of Victoria. Cost, budget, and…

  12. Knowledge Acquisition, Validation, and Maintenance in a Planning System for Automated Image Processing

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintainting the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems. This paper describes a planning application of automated imaging processing and our overall approach to knowledge acquisition for this application.

  13. The key to using a learning or skill acquisition plan.

    PubMed

    Nicholls, Delwyn; Sweet, Linda; Westerway, Sue Campbell; Gibbins, Annie

    2014-11-01

    A learning plan is a tool to guide the development of knowledge, skills and professional attitudes required for practice. A learning plan is an ideal tool for both supervisors and mentors to guide the process of teaching and learning a medical ultrasound examination. A good learning plan will state the learning goal, identify the learning activities and resources needed to achieve this goal, and highlight the outcome measures, which when achieved indicate the goal has been accomplished. A skill acquisition plan provides a framework for task acquisition and skill stratification; and is an extension of the application of the student learning plan. One unique feature of a skill acquisition plan is it requires the tutor to first undertake a task analysis. The task steps are progressively learnt in sequence, termed scaffolding. The skills to develop and use a learning or skill acquisition plan are also learnt, but are an integral component to the ultrasound tutors skill set. This paper will provide an outline of how to use and apply a learning and skill acquisition plan. We will review how these tools can be personalised to each student and skill teaching environment.

  14. Satellite land use acquisition and applications to hydrologic planning models

    NASA Technical Reports Server (NTRS)

    Algazi, V. R.; Suk, M.

    1977-01-01

    A developing operational procedure for use by the Corps of Engineers in the acquisition of land use information for hydrologic planning purposes was described. The operational conditions preclude the use of dedicated, interactive image processing facilities. Given the constraints, an approach to land use classification based on clustering seems promising and was explored in detail. The procedure is outlined and examples of application to two watersheds given.

  15. 48 CFR 907.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... acquisition plans. (b)(16) Environmental and energy conservation objectives. Incorporate sustainable building considerations including building location and regional planning considerations into planning for new Federal...

  16. Crawler Acquisition and Testing Demonstration Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  17. Research-based planning for change: assessing nurses' attitudes toward governance and professional practice autonomy after hospital acquisition.

    PubMed

    George, V M; Burke, L J; Rodgers, B L

    1997-05-01

    This article describes one medical center's experience in using research to plan for nursing staff integration after hospital acquisition. Resistance to new policies, procedures, and standards; passive acceptance of new leadership; limited support for management plans; and failure to integrate with new nursing units are common staff reactions after acquisitions. Little has been written regarding which key staff variables to assess after acquisitions and how to use this data to plan for change. Structural contingency and attribution theory were used to guide leadership staff's assessment of acquired staff attributes to determine their congruence with concepts valued by the acquiring organization. Qualitative and quantitative data were collected using a survey method. All 141 registered nurses and licensed practical nurses of the acquired medical center received a mailed survey. Sixty-six completed surveys were returned through the U.S. mail. No identifying information was placed on the survey to assure anonymity. The survey results described nurses perceptions of the advantages, concerns, and suggestions for a smooth transition after acquisition. In addition, the results clarified that nurses in the newly acquired hospital preferred a shared governance structure (congruent with the acquiring medical center's values) and the nurses perceived professional nursing autonomy was similar to that of nurses who worked at the acquiring medical center. By sharing the findings, both staffs were sensitized to the similarities among the staff as well as to their differences. Transition strategies were planned to capitalize on this knowledge. This process may be useful for other nurse executives to replicate as they guide their organizations through similar transitions.

  18. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... EVMS is required (see FAR 34.202(a)) and a pre-award IBR is contemplated, the acquisition plan must discuss— (i) How the pre-award IBR will be considered in the source selection decision; (ii) How it will... directly compensated for the costs of participating in a pre-award IBR. (4) Acquisition considerations. (i...

  19. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... EVMS is required (see FAR 34.202(a)) and a pre-award IBR is contemplated, the acquisition plan must discuss— (i) How the pre-award IBR will be considered in the source selection decision; (ii) How it will... directly compensated for the costs of participating in a pre-award IBR. (5) Acquisition considerations. (i...

  20. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Where may we obtain help with our motor vehicle acquisition plans? 102-34.80 Section 102-34.80 Public Contracts and Property... obtain help with our motor vehicle acquisition plans? For help with your motor vehicle acquisition plans...

  1. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Where may we obtain help with our motor vehicle acquisition plans? 102-34.80 Section 102-34.80 Public Contracts and Property... obtain help with our motor vehicle acquisition plans? For help with your motor vehicle acquisition plans...

  2. AZ-101 Mixer Pump Demonstration Data Acquisition System and Gamma Cart Data Acquisition Control System Software Configuration Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WHITE, D.A.

    1999-12-29

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS).

  3. Manage Toward Success - Utilization of Analytics in Acquisition Decision Making

    DTIC Science & Technology

    2015-04-01

    on the concept of knowledge- based acquisition described by the GAO. In the GAO (2005) report for National Aeronautics and Space Administration ( NASA ...acquisition programs, GAO recommended to NASA , and NASA subsequently con- curred, that transition to a knowledge-based acquisition framework will...Certification and Accreditation Process; ERAM = Enterprise Risk Assessment Manager; EVMS = Earned Value Management System; GOV = Government; POA&M = Plan of

  4. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  5. A Five-Year Plan for Meeting the Automatic Data Processing and Telecommunications Needs of the Federal Government. Volume 2: Major Information Technology Systems Acquisition Plans of Federal Executive Agencies, 1984-1989.

    ERIC Educational Resources Information Center

    Department of Commerce, Washington, DC.

    This volume, the second of two, presents and analyzes the information technology acquisition plans of the Federal Government by agency and component. A brief description covers the outlays planned for major information technology acquisitions of general purpose data processing and telecommunications systems, facilities, and related services for 6…

  6. Processes Asunder: Acquisition & Planning Misfits

    DTIC Science & Technology

    2009-03-26

    Establishing six Business Enterprise Priorities ( BEPs ) to focus the Department’s business transformation efforts, which now guide DoD investment decisions...three phases which look very much like Milestone A, B, and C of the previously existing Life Cycle Management Framework . With this obvious redundancy...February 2002). 30 6 Defense Acquisition University, “Integrated Defense Acquisition, Technology, & Logistics Life Cycle Management Framework , version 5.2

  7. Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase 1 Technical Report

    DTIC Science & Technology

    1990-04-05

    MANAGEMENT INFORMATION , COMMUNICATIONS, AND COMPUTER SCIENCES Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase I Technical...perceived provides information in multiple modalities and, in fact, we may rely on a non-verbal mode for much of our understanding of the situation...some tasks, almost all the pertinent information is provided via diagrams, maps, znd other illustrations. Visual Knowledge Visual experience forms a

  8. Knowledge Acquisition, Knowledge Programming, and Knowledge Refinement.

    ERIC Educational Resources Information Center

    Hayes-Roth, Frederick; And Others

    This report describes the principal findings and recommendations of a 2-year Rand research project on machine-aided knowledge acquisition and discusses the transfer of expertise from humans to machines, as well as the functions of planning, debugging, knowledge refinement, and autonomous machine learning. The relative advantages of humans and…

  9. 48 CFR 207.401 - Acquisition considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Equipment Lease or Purchase 207.401... prepare and provide the contracting officer with the justification supporting the decision to lease or purchase. ...

  10. Defense Acquisition Workforce: Actions Needed to Guide Planning Efforts and Improve Workforce Capability

    DTIC Science & Technology

    2015-12-01

    positions. However, 6 of the 13 acquisition career fields, including 3 priority career fields—contracting, business and engineering—did not meet growth...the competency assessment process and challenges. The leaders we interviewed were from the business ; program management; contracting; engineering...Complete Assessments to Improve Future Civilian Strategic Workforce Plans, GAO-12- 1014 (Washington, D.C.: September 27, 2012). 5GAO, High-Risk Series: An

  11. Report: Improved Acquisition Planning Will Help EPA Reduce Hundreds of Millions of Dollars in High-Risk Contracts

    EPA Pesticide Factsheets

    Report #18-P-0038, November 15, 2017. Without improving its acquisition planning process, the EPA may continue to spend hundreds of millions of dollars on high-risk contracts that waste taxpayer resources.

  12. Earth Observing System/Advanced Microwave SoundingUnit-A (EOS/AMSU-A): Acquisition activities plan

    NASA Technical Reports Server (NTRS)

    Schwantje, Robert

    1994-01-01

    This is the acquisition activities plan for the software to be used in the Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) system. This document is submitted in response to Contract NAS5-323 14 as CDRL 508. The procurement activities required to acquire software for the EOS/AMSU-A program are defined.

  13. Development of a Unix/VME data acquisition system

    NASA Astrophysics Data System (ADS)

    Miller, M. C.; Ahern, S.; Clark, S. M.

    1992-01-01

    The current status of a Unix-based VME data acquisition development project is described. It is planned to use existing Fortran data collection software to drive the existing CAMAC electronics via a VME CAMAC branch driver card and associated Daresbury Unix driving software. The first usable Unix driver has been written and produces single-action CAMAC cycles from test software. The data acquisition code has been implemented in test mode under Unix with few problems and effort is now being directed toward finalizing calls to the CAMAC-driving software and ultimate evaluation of the complete system.

  14. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time when...

  15. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time when...

  16. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time when...

  17. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time when...

  18. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time when...

  19. 48 CFR 908.7101-3 - Direct acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Direct acquisition. 908.7101-3 Section 908.7101-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7101-3 Direct...

  20. Introduction to Defense Acquisition Management

    DTIC Science & Technology

    1989-03-01

    the system after Most new systems follow the same formatted and its usefullness in the weapon inventory predictable life cycle, and fit the model...natives for system concept development Statement (MNS) setting forth requirements need- -An acquisition strategy is developed to guide ed to meet the...6 BUSINESS, FINANCIAL AND TECHNICAL ASPECTS OF SYSTEMS ACQUISITION Management of the systems acquisition process The acquisition planning phase of the

  1. Making Acquisition Measurable

    DTIC Science & Technology

    2011-04-30

    Corporation. All rights reserved End Users Administrator/ Maintainer (A/M) Subject Matter Expert ( SME ) Trainer/ Instructor Manager, Evaluator, Supervisor... CMMI ) - Acquisition (AQ) © 2011 The MITRE Corporation. All rights reserved 13 CMMI -Development Incremental iterative development (planning & execution...objectives Constructing games highlighting particular aspects of proposed CCOD® acquisition, and conducting exercises with Subject Matter Experts ( SMEs

  2. Acquisition, preprocessing, and reconstruction of ultralow dose volumetric CT scout for organ-based CT scan planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yin, Zhye, E-mail: yin@ge.com; De Man, Bruno; Yao, Yangyang

    Purpose: Traditionally, 2D radiographic preparatory scan images (scout scans) are used to plan diagnostic CT scans. However, a 3D CT volume with a full 3D organ segmentation map could provide superior information for customized scan planning and other purposes. A practical challenge is to design the volumetric scout acquisition and processing steps to provide good image quality (at least good enough to enable 3D organ segmentation) while delivering a radiation dose similar to that of the conventional 2D scout. Methods: The authors explored various acquisition methods, scan parameters, postprocessing methods, and reconstruction methods through simulation and cadaver data studies tomore » achieve an ultralow dose 3D scout while simultaneously reducing the noise and maintaining the edge strength around the target organ. Results: In a simulation study, the 3D scout with the proposed acquisition, preprocessing, and reconstruction strategy provided a similar level of organ segmentation capability as a traditional 240 mAs diagnostic scan, based on noise and normalized edge strength metrics. At the same time, the proposed approach delivers only 1.25% of the dose of a traditional scan. In a cadaver study, the authors’ pictorial-structures based organ localization algorithm successfully located the major abdominal-thoracic organs from the ultralow dose 3D scout obtained with the proposed strategy. Conclusions: The authors demonstrated that images with a similar degree of segmentation capability (interpretability) as conventional dose CT scans can be achieved with an ultralow dose 3D scout acquisition and suitable postprocessing. Furthermore, the authors applied these techniques to real cadaver CT scans with a CTDI dose level of less than 0.1 mGy and successfully generated a 3D organ localization map.« less

  3. DATA QUALITY OBJECTIVES IN RESEARCH PLANNING AT MED: THREE CASE STUDIES

    EPA Science Inventory

    This course will give a quality assurance perspective to research planning by describing the Data Quality Objective Process....Written plans are mandatory for all EPA environmental data collection activities according to EPA Order 5360.1 CHG 1 and Federal Acquisition Regulations,...

  4. Skylab consolidated instrumentation plan for SL-1/SL-2

    NASA Technical Reports Server (NTRS)

    Clark, D. E.

    1972-01-01

    The consolidated instrumentation plan is presented for employing optical and electronic data acquisition systems to monitor the performance and trajectory of Skylab 1 and Skylab 2 vehicles during the launch phase. Telemetry, optical, and electronic tracking equipment on board the vehicles, and data acquisition systems monitoring the flights are discussed. Flight safety instrumentation, vehicle data transmission systems, and instrumentation geography are also described.

  5. NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)

    EPA Science Inventory

    This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...

  6. 29 CFR 2550.408e - Statutory exemption for acquisition or sale of qualifying employer securities and for acquisition...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or sale by a plan of qualifying employer securities (as defined in section 407(d)(5) of the Act), or any acquisition, sale or lease by a plan of qualifying employer real property (as defined in section... 29 Labor 9 2010-07-01 2010-07-01 false Statutory exemption for acquisition or sale of qualifying...

  7. Planning applications in image analysis

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1994-01-01

    We describe two interim results from an ongoing effort to automate the acquisition, analysis, archiving, and distribution of satellite earth science data. Both results are applications of Artificial Intelligence planning research to the automatic generation of processing steps for image analysis tasks. First, we have constructed a linear conditional planner (CPed), used to generate conditional processing plans. Second, we have extended an existing hierarchical planning system to make use of durations, resources, and deadlines, thus supporting the automatic generation of processing steps in time and resource-constrained environments.

  8. 76 FR 10476 - (General Provisions) Contract Appeals and the Acquisition Regulation: General, Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... DEPARTMENT OF ENERGY 10 CFR Part 1023 48 CFR Parts 901, 902, 903, 904, 906, 907, 908, 909, 911, 914, 915, 916, 917, and 952 RIN 1991-AB81 (General Provisions) Contract Appeals and the Acquisition Regulation: General, Acquisition Planning, and Contracting Methods and Contract Types Correction In rule...

  9. Continuous table acquisition MRI for radiotherapy treatment planning: Distortion assessment with a new extended 3D volumetric phantom

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Amy, E-mail: aw554@uowmail.edu.au; Metcalfe, Peter; Liney, Gary

    2015-04-15

    Purpose: Accurate geometry is required for radiotherapy treatment planning (RTP). When considering the use of magnetic resonance imaging (MRI) for RTP, geometric distortions observed in the acquired images should be considered. While scanner technology and vendor supplied correction algorithms provide some correction, large distortions are still present in images, even when considering considerably smaller scan lengths than those typically acquired with CT in conventional RTP. This study investigates MRI acquisition with a moving table compared with static scans for potential geometric benefits for RTP. Methods: A full field of view (FOV) phantom (diameter 500 mm; length 513 mm) was developedmore » for measuring geometric distortions in MR images over volumes pertinent to RTP. The phantom consisted of layers of refined plastic within which vitamin E capsules were inserted. The phantom was scanned on CT to provide the geometric gold standard and on MRI, with differences in capsule location determining the distortion. MRI images were acquired with two techniques. For the first method, standard static table acquisitions were considered. Both 2D and 3D acquisition techniques were investigated. With the second technique, images were acquired with a moving table. The same sequence was acquired with a static table and then with table speeds of 1.1 mm/s and 2 mm/s. All of the MR images acquired were registered to the CT dataset using a deformable B-spline registration with the resulting deformation fields providing the distortion information for each acquisition. Results: MR images acquired with the moving table enabled imaging of the whole phantom length while images acquired with a static table were only able to image 50%–70% of the phantom length of 513 mm. Maximum distortion values were reduced across a larger volume when imaging with a moving table. Increased table speed resulted in a larger contribution of distortion from gradient nonlinearities in the through

  10. 32 CFR 644.7 - Acquisition lines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Acquisition lines. 644.7 Section 644.7 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As...

  11. 32 CFR 644.7 - Acquisition lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As..., in accordance with sound real estate practices. Accordingly, fringe tracts will not be acquired until...

  12. 48 CFR 5.405 - Exchange of acquisition information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Exchange of acquisition... ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release of Information 5.405 Exchange of acquisition... than one contracting activity within an agency, the exchange and coordination of pertinent information...

  13. 48 CFR 47.202 - Presolicitation planning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Presolicitation planning. 47.202 Section 47.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT... Presolicitation planning. Contracting officers shall inform activities that plan to acquire transportation or...

  14. Decision-theoretic approach to data acquisition for transit operations planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ritchie, S.G.

    The most costly element of transportation planning and modeling activities in the past has usually been that of data acquisition. This is even truer today when the unit costs of data collection are increasing rapidly and at the same time budgets are severely limited by continuing policies of fiscal austerity in the public sector. The overall objectives of this research were to improve the decisions and decision-making capabilities of transit operators or planners in short-range transit planning, and to improve the quality and cost-effectiveness of associated route or corridor-level data collection and service monitoring activities. A new approach was presentedmore » for sequentially updating the parameters of both simple and multiple linear regression models with stochastic regressors, and for determining the expected value of sample information and expected net gain of sampling for associated sample designs. A new approach was also presented for estimating and updating (both spatially and temporally) the parameters of multinomial logit discrete choice models, and for determining associated optimal sample designs for attribute-based and choice-based sampling methods. The approach provides an effective framework for addressing the issue of optimal sampling method and sample size, which to date have been largely unresolved. The application of these methodologies and the feasibility of the decision-theoretic approach was illustrated with a hypothetical case study example.« less

  15. Acquisition How to Guide: Planning, Preparing, and Processing Acquisition Packages

    DTIC Science & Technology

    1993-08-01

    of Task Outline. In very simple acquisitions, the project officer or COR, with the advice and counsel of the Contract Specialist, may...three concise sentences , each limited to a single idea. Use simple sentence structure (i.e., subject-verb-complement/object). The natural order of words... in a sentence tells the function of each word. Use a paragraph to state a single idea and elaborate on it. State the

  16. Landsat-7 long-term acquisition plan radiometry - evolution over time

    USGS Publications Warehouse

    Markham, Brian L; Goward, Samuel; Arvidson, Terry; Barsi, Julia A.; Scaramuzza, Pat

    2006-01-01

    The Landsat-7 Enhanced Thematic Mapper Plus instrument has two selectable gains for each spectral band. In the acquisition plan, the gains were initially set to maximize the entropy in each scene. One unintended consequence of this strategy was that, at times, dense vegetation saturated band 4 and deserts saturated all bands. A revised strategy, based on a land-cover classification and sun angle thresholds, reduced saturation, but resulted in gain changes occurring within the same scene on multiple overpasses. As the gain changes cause some loss of data and difficulties for some ground processing systems, a procedure was devised to shift the gain changes to the nearest predicted cloudy scenes. The results are still not totally satisfactory as gain changes still impact some scenes and saturation still occurs, particularly in ephemerally snow-covered regions. A primary conclusion of our experience with variable gain on Landsat-7 is that such an approach should not be employed on future global monitoring missions.

  17. Acquisition of background and technical information and class trip planning

    NASA Technical Reports Server (NTRS)

    Mackinnon, R. M.; Wake, W. H.

    1981-01-01

    Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.

  18. 48 CFR 208.7403 - Acquisition procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Enterprise Software Agreements 208.7403 Acquisition procedures. Follow the procedures at PGI 208.7403 when acquiring commercial software and related services. [71 FR 39005, July 11, 2006] ...

  19. 48 CFR 806.570 - Planning requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Planning requirements. 806... AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Competition Advocates 806.570 Planning requirements... planning that is required. (3) A description of how to integrate the Competition Plan into advance...

  20. Applications Of Digital Image Acquisition In Anthropometry

    NASA Astrophysics Data System (ADS)

    Woolford, Barbara; Lewis, James L.

    1981-10-01

    Anthropometric data on reach and mobility have traditionally been collected by time consuming and relatively inaccurate manual methods. Three dimensional digital image acquisition promises to radically increase the speed and ease of data collection and analysis. A three-camera video anthropometric system for collecting position, velocity, and force data in real time is under development for the Anthropometric Measurement Laboratory at NASA's Johnson Space Center. The use of a prototype of this system for collecting data on reach capabilities and on lateral stability is described. Two extensions of this system are planned.

  1. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... services for designs, plans, specifications, and surveys. (6) Acquisition and preparation costs of... acquisition cost is under $100,000, it shall be reported as under $100,000. (g) Software acquisition costs include software costs incurred up through acceptance testing and material internal costs incurred to...

  2. 48 CFR 1034.004 - Acquisition strategy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Order, Task Order, or Interagency Agreement) to the overall investment requirements and management... investment; (3) A description of the effort, by acquisition, and the plans to include required clauses in the... requirements to manage the acquisition processes through the investment lifecycle; (7) Consideration of optimal...

  3. Apollo/Saturn 5 consolidated instrumentation plan for AS-511 (Apollo 16)

    NASA Technical Reports Server (NTRS)

    Clark, D. E.

    1972-01-01

    The consolidated instrumentation plan, for employing optical and electronic data acquisition systems to monitor the performance and trajectory of Apollo Saturn 5 vehicle 511 during the launch phase of the mission (prelaunch, liftoff to insertion), is presented. Telemetry, optical, and electronic tracking equipment on board the vehicle and data acquisition systems monitoring the flight are discussed. Flight safety instrumentation, vehicle data transmission systems, and geophysical instrumentation are also described.

  4. Acquisition Systems Protection Planning the Manhatten Project: A Case Study

    DTIC Science & Technology

    1994-06-03

    This study examines the counterintelligence and security programs of the Manhattan Project , the United States acquisition of the atomic bomb, using...assessment methodology and counterintelligence techniques and procedures. Acquisition systems, Program protection, Manhattan Project , Atomic bomb, Technology protection, Counterintelligence, Security.

  5. Developing capital investment guidelines for acquisitions.

    PubMed

    Bergman, J T; Gordon, D C

    1988-05-01

    Financial managers are now being asked to evaluate new investment opportunities, such as acquisitions. To do a thorough evaluation, however, it is important to have a plan of action to follow. Strategies such as establishing a framework for evaluating acquisitions based on strategic compatibility with the existing organization, establishing suitable risk-adjusted discount rates for assessing investments, and selecting the proper type of capital allocation method are all necessary steps to ensure a successful acquisition.

  6. Using the Dreyfus Model of Skill Acquisition to Describe and Interpret Skill Acquisition and Clinical Judgment in Nursing Practice and Education

    ERIC Educational Resources Information Center

    Benner, Patricia

    2004-01-01

    Three studies using the Dreyfus model of skill acquisition were conducted over a period of 21 years. Nurses with a range of experience and reported skillfulness were interviewed. Each study used nurses' narrative accounts of actual clinical situations. A subsample of participants were observed and interviewed at work. These studies extend the…

  7. An Analysis of Current Operational Contract Support Planning Doctrine

    DTIC Science & Technology

    2015-09-01

    P). This project argues for the balanced development of OCS planning acquisition and non-acquisition focused resources to effectively integrate this...planning guidance developed is appropriate for initial entry operations applicable to various levels of theater maturity. 14. SUBJECT TERMS...balanced development of OCS planning acquisition and non- acquisition focused resources to effectively integrate this function across disciplines. The

  8. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Mineral acquisition practices. 644.5 Section 644.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a...

  9. 48 CFR 3409.570 - Certification at or below the simplified acquisition threshold.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Certification at or below the simplified acquisition threshold. 3409.570 Section 3409.570 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant...

  10. 48 CFR 3409.570 - Certification at or below the simplified acquisition threshold.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Certification at or below the simplified acquisition threshold. 3409.570 Section 3409.570 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant...

  11. 48 CFR 3409.570 - Certification at or below the simplified acquisition threshold.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Certification at or below the simplified acquisition threshold. 3409.570 Section 3409.570 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant...

  12. Acquisition Management for System of Systems: Requirement Evolution and Acquisition Strategy Planning

    DTIC Science & Technology

    2013-01-29

    of modern portfolio and control theory . The reformulation allows for possible changes in estimated quantities (e.g., due to market shifts in... Portfolio Theory (MPT). Final Report: NPS award N00244-11-1-0003 5 Extending CEM and Markov: Agent-Based Modeling Approach Research conducted in the...integration and acquisition from a robust portfolio theory standpoint. Robust portfolio management methodologies have been widely used by financial

  13. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  14. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  15. 32 CFR 644.5 - Mineral Acquisition Practices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Mineral Acquisition Practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral Acquisition Practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  16. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  17. 48 CFR 217.7405 - Plans and reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Plans and reports. 217.7405 Section 217.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Undefinitized Contract Actions 217.7405 Plans and reports. (a)...

  18. 48 CFR 217.7405 - Plans and reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Plans and reports. 217.7405 Section 217.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Undefinitized Contract Actions 217.7405 Plans and reports. (a)...

  19. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  20. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  1. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  2. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  3. 48 CFR 37.604 - Quality assurance surveillance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... surveillance plans. 37.604 Section 37.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... assurance surveillance plans. Requirements for quality assurance and quality assurance surveillance plans are in Subpart 46.4. The Government may either prepare the quality assurance surveillance plan or...

  4. Evaluating mergers and acquisitions with a purchase investigation.

    PubMed

    Grant, E A; Giniat, E J

    1988-04-01

    Mergers and acquisitions are risk transactions. Therefore, a well-planned and executed purchase investigation that considers financial, personnel, legal and risk management, third-party payer, and medical staff issues is imperative. Organizations that can successfully complete a purchase investigation will be able to make better informed, lower risk, financial decisions, and will have a competitive advantage in achieving strategic goals. This article is the third in a series on mergers and acquisitions. Other articles will include legal issues and capital planning.

  5. Strategic Marketing Planning: Creative Strategies for Developing Unique Income Sources.

    ERIC Educational Resources Information Center

    Scigliano, John A.

    After discussing current community college financial problems, this paper examines the acquisition of alternative funding through the application of marketing strategies and strategic planning. The paper first differentiates marketing from sales or promotion and then describes the ability of a marketing program to attract new consumers and to…

  6. Coordinating Council. Seventh Meeting: Acquisitions

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The theme for this NASA Scientific and Technical Information Program Coordinating Council meeting was Acquisitions. In addition to NASA and the NASA Center for AeroSpace Information (CASI) presentations, the report contains fairly lengthy visuals about acquisitions at the Defense Technical Information Center. CASI's acquisitions program and CASI's proactive acquisitions activity were described. There was a presentation on the document evaluation process at CASI. A talk about open literature scope and coverage at the American Institute of Aeronautics and Astronautics was also given. An overview of the STI Program's Acquisitions Experts Committee was given next. Finally acquisitions initiatives of the NASA STI program were presented.

  7. Design techniques for developing a computerized instrumentation test plan. [for wind tunnel test data acquisition system

    NASA Technical Reports Server (NTRS)

    Burnett, S. Kay; Forsyth, Theodore J.; Maynard, Everett E.

    1987-01-01

    The development of a computerized instrumentation test plan (ITP) for the NASA/Ames Research Center National Full Scale Aerodynamics Complex (NFAC) is discussed. The objective of the ITP program was to aid the instrumentation engineer in documenting the configuration and calibration of data acquisition systems for a given test at any of four low speed wind tunnel facilities (Outdoor Aerodynamic Research Facility, 7 x 10, 40 x 80, and 80 x 120) at the NFAC. It is noted that automation of the ITP has decreased errors, engineering hours, and setup time while adding a higher level of consistency and traceability.

  8. 48 CFR 1602.170-3 - Comprehensive medical plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...

  9. 48 CFR 1602.170-3 - Comprehensive medical plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...

  10. 48 CFR 1602.170-3 - Comprehensive medical plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...

  11. 48 CFR 1602.170-3 - Comprehensive medical plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...

  12. Mergers and acquisitions: new arrangements in health care. Part 1.

    PubMed

    Grant, E A

    1988-02-01

    Mergers and acquisitions are assuming a more important role in the healthcare industry today. These transactions require various issues be considered, such as valuation, capital planning, and so forth. In this article, the first in a five-part series on mergers and acquisitions, the fundamental methods and techniques of valuation are discussed. Some of these valuation methods, including comparative market transactions and free cash flow, are explained and examples are used to help potential purchasers and sellers to determine an organization's true value. Other articles in this series will include legal issues, tax implications, purchase investigations, and capital planning for mergers and acquisitions.

  13. 48 CFR 908.7101-6 - Acquisition of fuel-efficient vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special..., and certain types of light trucks as specified by GSA, are subject to the requirements of the Energy...

  14. The Defense Acquisition Workforce Improvement Strategy. Appendix 1: DOD Strategic Human Capital Plan Update. The Defense Acquisition Workforce

    DTIC Science & Technology

    2010-04-01

    Frank J . Anderson, Jr., April 5, 2010. A Message from the Under Secretary of Defense For Acquisition, Technology and Logistics The importance of...Defense agencies. The Deputy Secretary of Defense, the Honorable William J . Lynn III, recently emphasized that the acquisition workforce rebalancing...20 Asch B., Haider S., and Zizzimopoulos, J . (2003) The Effects of Workforce-Shaping Incentives

  15. DART -- Data acquisition for the next generation of Fermilab fixed target experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oleynik, G.; Anderson, J.; Appleton, L.

    1994-02-01

    DART is the name of the data acquisition effort for Fermilab experiments taking data in the '94--'95 time frame and beyond. Its charge is to provide a common system of hardware and software, which can be easily configured and extended to meet the wide range of data acquisition requirements of the experiments. Its strategy is to provide incrementally functional data acquisition systems to the experiments at frequent intervals to support the ongoing DA activities of the experiments. DART is a collaborative development effort between the experimenters and the Fermilab Computing Division. Experiments collaborating in DART cover a range of requirementsmore » from 400 Kbytes/sec event readout using a single DA processor, to 200 Mbytes/sec event readout involving 10 parallel readout streams, 10 VME event building planes and greater than 1,000 MIPs of event filter processing. The authors describe the requirements, architecture, and plans for the project and report on its current status.« less

  16. The Impact of Maintenance Free Operating Period Approach to Acquisition Approaches, System Sustainment, and Costs

    DTIC Science & Technology

    2013-01-07

    of MFOP principles on processes, procedures , and costs in acquisition planning. It investigates MFOP and reviews the results of a 2005 submarine pilot...approach be a game changer? This paper evaluates the potential impact of MFOP principles on processes, procedures , and costs in acquisition planning. It...elli=lc=_rpfkbpp=C=mr_if`=mlif`v= = - 2 - k^s^i=mlpqdo^ar^qb=p`elli= procedures , and costs in acquisition planning. The scope of the research was to

  17. Augmentative and Alternative Communication for Children with Autism Spectrum Disorder: An Evidence-Based Evaluation of the Language Acquisition through Motor Planning (LAMP) Programme

    ERIC Educational Resources Information Center

    Bedwani, Mary-Ann Naguib; Bruck, Susan; Costley, Debra

    2015-01-01

    Children diagnosed with autism spectrum disorder often have restricted verbal communication. For children who do not use functional speech, augmentative and alternative communication (AAC) devices can be an important support. We evaluated the effectiveness of one AAC programme, the Language Acquisition through Motor Planning (LAMP) using a Vantage…

  18. Designing a Graphical Decision Support Tool to Improve System Acquisition Decisions

    DTIC Science & Technology

    2009-06-01

    relationships within the data [9]. Displaying acquisition data in a graphical manner was chosen because graphical formats, in general, have been...acquisition plan which includes information pertaining to the acquisition objectives, the required capability of the system, design trade-off, budgeting...which introduce artificial neural networks to approximate the real world experience of an acquisition manager [8]. However, these strategies lack a

  19. 48 CFR 2801.603-1 - Department of Justice Acquisition Career Management Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Representatives, or equivalent positions. (c) The program shall include: (1) Management information system... acquisition workforce management information system. (2) Individual assessments and development plans for... Acquisition Career Management Program. 2801.603-1 Section 2801.603-1 Federal Acquisition Regulations System...

  20. 48 CFR 1602.170-9 - Health benefits plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Health benefits plan. 1602... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms 1602.170-9 Health benefits plan. Health benefits plan means a group insurance policy, contract...

  1. 48 CFR 1602.170-9 - Health benefits plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Health benefits plan. 1602... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms 1602.170-9 Health benefits plan. Health benefits plan means a group insurance policy, contract...

  2. 48 CFR 1602.170-9 - Health benefits plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Health benefits plan. 1602... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms 1602.170-9 Health benefits plan. Health benefits plan means a group insurance policy, contract...

  3. 48 CFR 1602.170-9 - Health benefits plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Health benefits plan. 1602... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms 1602.170-9 Health benefits plan. Health benefits plan means a group insurance policy, contract...

  4. 48 CFR 1602.170-9 - Health benefits plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Health benefits plan. 1602... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP Terms 1602.170-9 Health benefits plan. Health benefits plan means a group insurance policy, contract...

  5. War-gaming application for future space systems acquisition: MATLAB implementation of war-gaming acquisition models and simulation results

    NASA Astrophysics Data System (ADS)

    Vienhage, Paul; Barcomb, Heather; Marshall, Karel; Black, William A.; Coons, Amanda; Tran, Hien T.; Nguyen, Tien M.; Guillen, Andy T.; Yoh, James; Kizer, Justin; Rogers, Blake A.

    2017-05-01

    The paper describes the MATLAB (MathWorks) programs that were developed during the REU workshop1 to implement The Aerospace Corporation developed Unified Game-based Acquisition Framework and Advanced Game - based Mathematical Framework (UGAF-AGMF) and its associated War-Gaming Engine (WGE) models. Each game can be played from the perspectives of the Department of Defense Acquisition Authority (DAA) or of an individual contractor (KTR). The programs also implement Aerospace's optimum "Program and Technical Baseline (PTB) and associated acquisition" strategy that combines low Total Ownership Cost (TOC) with innovative designs while still meeting warfighter needs. The paper also describes the Bayesian Acquisition War-Gaming approach using Monte Carlo simulations, a numerical analysis technique to account for uncertainty in decision making, which simulate the PTB development and acquisition processes and will detail the procedure of the implementation and the interactions between the games.

  6. DFL, Canada's Space AIT Facilities - Current and Planned Capabilities

    NASA Astrophysics Data System (ADS)

    Singhal, R.; Mishra, S.; Choueiry, E.; Dumoulin, J.; Ahmed, S.

    2004-08-01

    The David Florida Laboratory (DFL) of the Canadian Space Agency is the Canadian national ISO 9001:2000 registered facility for the assembly, integration, and (environmental) testing of space hardware. This paper briefly describes the three main qualification facilities: Structural Qualification Facilities (SQF); Radio Frequency Qualification Facilities (RFQF); and Thermal Qualification Facilities (TQF). The paper also describes the planned/new upgrades/improvements to the DFL's existing capabilities. These include: cylindrical near-field antenna measurement system, current capabilities in multi-frequency multi-band passive intermodulation (PIM) measurement; combined thermal/vibration test facility, improvement in efficiency and performance of the photogrammetry capability, acquisition of an additional mass properties measurement system for small and micro-satellites; combined control and data acquisition system for all existing thermal vacuum facilities, plus a new automatic thermal control system and hypobaric chamber.

  7. 48 CFR 1028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1028.307-1 Group insurance plans. (a) Plans shall be...

  8. 48 CFR 3028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Group insurance plans. 3028.307-1 Section 3028.307-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY....307-1 Group insurance plans. Plans shall be submitted to the contracting officer, who must obtain the...

  9. 48 CFR 3028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Group insurance plans. 3028.307-1 Section 3028.307-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY....307-1 Group insurance plans. Plans shall be submitted to the contracting officer, who must obtain the...

  10. 48 CFR 1028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1028.307-1 Group insurance plans. (a) Plans shall be...

  11. 48 CFR 1028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1028.307-1 Group insurance plans. (a) Plans shall be...

  12. 48 CFR 3028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Group insurance plans. 3028.307-1 Section 3028.307-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY....307-1 Group insurance plans. Plans shall be submitted to the contracting officer, who must obtain the...

  13. 48 CFR 1028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1028.307-1 Group insurance plans. (a) Plans shall be...

  14. Acquisition of Crosswell Seismic Monitoring Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daley, T.M.; Niu, F.; Silver, P.G.

    2008-02-15

    Crosswell seismic acquisition provides an ideal geometry for monitoring travel time changes in the subsurface. Analysis of delay time in terms of a characteristic frequency allows us to estimate optimal acquisition parameters (frequency and distance). We have deployed standard data acquisition equipment for continuous monitoring of crosswell travel time in two separate field experiments, with well spacing of 3 and 30 m. The acquisition hardware used for the field experiments is described, along with environmental effects (such as temperature) that influence the measurements. Two field experiments are described that correlate changes in travel time (and therefore velocity) with changes inmore » barometric pressure. The results from the two field sites show a pressure sensitivity for velocity of 10{sup -6}/Pa to 10{sup -8}/Pa.« less

  15. 48 CFR 2919.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...

  16. 48 CFR 1515.305-70 - Scoring plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Scoring plans. 1515.305-70 Section 1515.305-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 1515.305-70 Scoring plans. When...

  17. 48 CFR 1515.305-70 - Scoring plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Scoring plans. 1515.305-70 Section 1515.305-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 1515.305-70 Scoring plans. When...

  18. 48 CFR 908.7101-2 - Consolidated acquisition of new vehicles by General Services Administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Consolidated acquisition of new vehicles by General Services Administration. 908.7101-2 Section 908.7101-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND...

  19. 48 CFR 206.303-70 - Acquisitions in support of operations in Iraq or Afghanistan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operations in Iraq or Afghanistan. 206.303-70 Section 206.303-70 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 206.303-70 Acquisitions in support of operations in Iraq or...

  20. 48 CFR 243.204-70-7 - Plans and reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Plans and reports. 243.204-70-7 Section 243.204-70-7 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-7 Plans and reports. To provide for enhanced...

  1. 48 CFR 243.204-70-7 - Plans and reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Plans and reports. 243.204-70-7 Section 243.204-70-7 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-7 Plans and reports. To provide for enhanced...

  2. Acquisition Management for System-of-Systems: Requirement Evolution and Acquisition Strategy Planning

    DTIC Science & Technology

    2012-04-30

    DoD SERC Aeronautics & Astronautics 5/16/2012 NPS 9th Annual Acquisition Research Symposium...0.6 0.7 0.8 0.9 1 0 60 120 180 240 300 360 420 480 540 600 Pr ob ab ili ty to c om pl et e a m is si on Time (mins) architecture 1 architecture 2...1 6 11 /1 6 12 /1 6 13 /1 6 14 /1 6 15 /1 6 1Pr ob ab ili ty to c om pl et e a m is si on % of system failures worst-case in arch1 worst-case in

  3. 78 FR 27966 - Joint Working Group on Improving Cybersecurity and Resilience Through Acquisition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... Working Group on Improving Cybersecurity and Resilience Through Acquisition AGENCY: Office of Emergency... the Department of Homeland Security and the Federal Acquisition Regulation Council, are required to... security standards into acquisition planning and contract administration and address what steps [[Page...

  4. 17 CFR 230.145 - Reclassification of securities, mergers, consolidations and acquisitions of assets.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., mergers, consolidations and acquisitions of assets. 230.145 Section 230.145 Commodity and Securities... § 230.145 Reclassification of securities, mergers, consolidations and acquisitions of assets.... A statutory merger or consolidation or similar plan or acquisition in which securities of such...

  5. 77 FR 9658 - General Services Administration Acquisition Regulation; Information Collection; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. This information... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  6. Continuing medical education-driven skills acquisition and impact on improved patient outcomes in family practice setting.

    PubMed

    Bellamy, N; Goldstein, L D; Tekanoff, R A

    2000-01-01

    An abundance of educational theory, design, and delivery of continuing medical education (CME) learning interventions, including their impact on learners, are described in the health and social sciences literature. However, establishing a direct correlation between the acquisition of new skills by learners and patient outcomes as a result of a planned CME learning intervention has been difficult to demonstrate. The learning intervention described here tested the impact of an injection skills-acquisition program for family physicians treating osteoarthritis of the knee by measuring patient outcomes using the pain and function subscales of the Western Ontario and McMaster (WOMAC) 3.0 osteoarthritis index, a standardized and fully validated patient-centered outcome measurement. It was hypothesized that patients of family physicians who participated in this skills-acquisition CME program would benefit from treatment administered by their physician during the time between injection skills acquisition to 6 weeks post-injection. Inclusion of a validated health status measure administered pre- and post-injection in addition to more traditional faculty and participant program evaluations was deemed necessary to test this hypothesis. Rheumatology, orthopedic surgery, and family medicine specialists from across Canada were invited to contribute to the planning, curriculum elaboration, and delivery of the viscosupplement injector preceptorship (VIP) program. Thirty-nine orthopedic and rheumatology specialists agreed to serve as expert faculty and participated in training 474 Canadian family and general practitioners over 8 months. The learning intervention involved a review of pertinent literature by a local preceptor and a summary of recommendations of the planning committee, followed by demonstration of injector skills and then supervised practice with patients, who received hylan G-F 20 (Synvisc, Ridgefield, NJ) usually in the offices of the family physicians. The pain and

  7. Multi-echo acquisition

    PubMed Central

    Posse, Stefan

    2011-01-01

    The rapid development of fMRI was paralleled early on by the adaptation of MR spectroscopic imaging (MRSI) methods to quantify water relaxation changes during brain activation. This review describes the evolution of multi-echo acquisition from high-speed MRSI to multi-echo EPI and beyond. It highlights milestones in the development of multi-echo acquisition methods, such as the discovery of considerable gains in fMRI sensitivity when combining echo images, advances in quantification of the BOLD effect using analytical biophysical modeling and interleaved multi-region shimming. The review conveys the insight gained from combining fMRI and MRSI methods and concludes with recent trends in ultra-fast fMRI, which will significantly increase temporal resolution of multi-echo acquisition. PMID:22056458

  8. Image Acquisition Context

    PubMed Central

    Bidgood, W. Dean; Bray, Bruce; Brown, Nicolas; Mori, Angelo Rossi; Spackman, Kent A.; Golichowski, Alan; Jones, Robert H.; Korman, Louis; Dove, Brent; Hildebrand, Lloyd; Berg, Michael

    1999-01-01

    Objective: To support clinically relevant indexing of biomedical images and image-related information based on the attributes of image acquisition procedures and the judgments (observations) expressed by observers in the process of image interpretation. Design: The authors introduce the notion of “image acquisition context,” the set of attributes that describe image acquisition procedures, and present a standards-based strategy for utilizing the attributes of image acquisition context as indexing and retrieval keys for digital image libraries. Methods: The authors' indexing strategy is based on an interdependent message/terminology architecture that combines the Digital Imaging and Communication in Medicine (DICOM) standard, the SNOMED (Systematized Nomenclature of Human and Veterinary Medicine) vocabulary, and the SNOMED DICOM microglossary. The SNOMED DICOM microglossary provides context-dependent mapping of terminology to DICOM data elements. Results: The capability of embedding standard coded descriptors in DICOM image headers and image-interpretation reports improves the potential for selective retrieval of image-related information. This favorably affects information management in digital libraries. PMID:9925229

  9. 48 CFR 212.301 - Solicitation provisions and contract clauses for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and contract clauses for the acquisition of commercial items. 212.301 Section 212.301 Federal... PLANNING ACQUISITION OF COMMERCIAL ITEMS Solicitation Provisions and Contract Clauses for the Acquisition of Commercial Items 212.301 Solicitation provisions and contract clauses for the acquisition of...

  10. 48 CFR 1228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Group insurance plans. 1228.307-1 Section 1228.307-1 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION... basis on proposed purchases of group insurance plans. Legal advice should be sought where necessary on...

  11. Strategic Planning and Management in Defense Systems Acquisition

    DTIC Science & Technology

    2014-04-30

    Strategic planning, according to Dr. John Bryson (2010), offers many benefits to public-sector organizations:  Promotes strategic thinking, acting, and...planning in particular—and has proven its value (Barzelay & Campbell, 2003; Berman & West, 1998; Berry & Wechsler, 1995; Boyne & Gould-Williams, 2003...national survey. Public Administration Review, 55(2), 159–68. Boyne , G. A., & Gould-Williams, J. (2003). Planning and performance in public organizations

  12. Generation of data acquisition requests for the ASTER satellite instrument for monitoring a globally distributed target: glaciers

    USGS Publications Warehouse

    Raup, B.H.; Kieffer, H.H.; Hare, T.M.; Kargel, J.S.

    2000-01-01

    The advanced spaceborne thermal emission and reflection radiometer (ASTER) instrument is scheduled to be launched on the EOS Terra platform in 1999. The Global Land Ice Measurements from Space project has planned to acquire ASTER images of most of the world's land ice annually during the six-year ASTER mission. This article describes the process of creating the data acquisition requests needed to cover approximately 170,000 glacier targets.

  13. 48 CFR 212.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 212.504 Section 212.504 Federal... PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items 212.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  14. 75 FR 22706 - Defense Federal Acquisition Regulation Supplement; Service Contract Surveillance (DFARS Case 2008...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to ensure that the requirement for a quality assurance surveillance plan is addressed for each contract with a dollar value above the simplified acquisition threshold, and that contracts for services have appropriate performance management or surveillance plans prepared for the work being performed under the contract.

  15. Trends in federal land acquisition, protection strategies, and planning

    Treesearch

    Warren Brown

    1980-01-01

    In the past, Federal land acquisition has been one of the most popular ways to protect outstanding natural resources and provide recreational opportunities. Federal purchase, maintenance, and operation can help take pressure off the State or local budget. Federal involvement also can provide a way for local officials to avoid making some tough decisions about...

  16. 48 CFR 1519.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Reviewing the subcontracting plan. 1519.705-4 Section 1519.705-4 Federal Acquisition Regulations System ENVIRONMENTAL... of a proposed subcontracting plan, the Contracting Officer shall obtain advice and recommendations...

  17. Acquisition of Scientific Literature in Developing Countries. 2: Malaysia.

    ERIC Educational Resources Information Center

    Taib, Rosna

    1989-01-01

    Describes the acquisition of scientific literature by academic libraries in Malaysia. The discussion covers the impact of government policies, library acquisition policies, the selection process, acquisition of special materials, the role of gifts and exchanges, and problems with customs clearance and censorship. Progress in cooperative…

  18. Reviews, Holdings, and Presses and Publishers in Academic Library Book Acquisitions.

    ERIC Educational Resources Information Center

    Calhoun, John C.

    2001-01-01

    Discussion of academic library book acquisition reviews pertinent literature on book reviews, book selection, and evaluation and proposes a model for academic library book acquisition using a two-year relational database file of approval plan records. Defines a core collection for the California State University system, and characterizes…

  19. Data Acquisition and Real-Time Systems.

    ERIC Educational Resources Information Center

    Lawrence, D. E., Ed.; Fenwick, P. M., Ed.

    The first group of papers starts with a tutorial paper which surveys the methods used in data acquisition systems. Other papers in this group describe: (1) some problems involved in the computer acquisition of high-speed randomly-occurring data and the protection of this data from accidental corruption, (2) an input/output bus to allow an IBM…

  20. Integrated Logistics Support Plan (ILSP) for the Ports and Waterways Safety System (PAWSS) Project - A Level I Major Acquisition

    DOT National Transportation Integrated Search

    1997-09-30

    This Integrated Logistics Support Plan (ILSP) serves as the master logistics planning document that describes necessary logistic activities, assigns responsibility for those activities, and establishes a schedule for completion. It is one of the init...

  1. 24 CFR 576.59 - Relocation and acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES EMERGENCY SHELTER GRANTS PROGRAM: STEWART B. McKINNEY HOMELESS... property, permanently and involuntarily, as a direct result of acquisition, rehabilitation, or demolition...

  2. 24 CFR 576.59 - Relocation and acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES EMERGENCY SHELTER GRANTS PROGRAM: STEWART B. McKINNEY HOMELESS... property, permanently and involuntarily, as a direct result of acquisition, rehabilitation, or demolition...

  3. Language Policy and Planning in South America.

    ERIC Educational Resources Information Center

    Hornberger, Nancy H.

    1994-01-01

    A discussion of language policy formation and planning in South America focuses on the highland indigenous sectors and covers the following: colonial languages; immigrant languages; and indigenous languages, including planning, acquisition planning, and corpus planning. (Contains 83 references.) (LB)

  4. 48 CFR 1602.170-3 - Comprehensive medical plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS...

  5. 77 FR 31016 - General Services Administration Acquisition Regulation; Submission for OMB Review; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. A notice was published... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  6. System Description for Tank 241-AZ-101 Waste Retrieval Data Acquisition System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMERO, S.G.

    2000-02-14

    The proposed activity provides the description of the Data Acquisition System for Tank 241-AZ-101. This description is documented in HNF-5572, Tank 241-AZ-101 Waste Retrieval Data Acquisition System (DAS). This activity supports the planned mixer pump tests for Tank 241-AZ-101. Tank 241-AZ-101 has been selected for the first full-scale demonstration of a mixer pump system. The tank currently holds over 960,000 gallons of neutralized current acid waste, including approximately 12.7 inches of settling solids (sludge) at the bottom of the tank. As described in Addendum 4 of the FSAR (LMHC 2000a), two 300 HP mixer pumps with associated measurement and monitoringmore » equipment have been installed in Tank 241-AZ-101. The purpose of the Tank 241-AZ-101 retrieval system Data Acquisition System (DAS) is to provide monitoring and data acquisition of key parameters in order to confirm the effectiveness of the mixer pumps utilized for suspending solids in the tank. The suspension of solids in Tank 241-AZ-101 is necessary for pretreatment of the neutralized current acid waste and eventual disposal as glass via the Hanford Waste Vitrification Plant. HNF-5572 provides a basic description of the Tank 241-AZ-101 retrieval system DAS, including the field instrumentation and application software. The DAS is provided to fulfill requirements for data collection and monitoring. This document is not an operations procedure or is it intended to describe the mixing operation. This USQ screening provides evaluation of HNF-5572 (Revision 1) including the changes as documented on ECN 654001. The changes include (1) add information on historical trending and data backup, (2) modify DAS I/O list in Appendix E to reflect actual conditions in the field, and (3) delete IP address in Appendix F per Lockheed Martin Services, Inc. request.« less

  7. An Overview of Advanced Data Acquisition System (ADAS)

    NASA Technical Reports Server (NTRS)

    Mata, Carlos T.; Steinrock, T. (Technical Monitor)

    2001-01-01

    The paper discusses the following: 1. Historical background. 2. What is ADAS? 3. R and D status. 4. Reliability/cost examples (1, 2, and 3). 5. What's new? 6. Technical advantages. 7. NASA relevance. 8. NASA plans/options. 9. Remaining R and D. 10. Applications. 11. Product benefits. 11. Commercial advantages. 12. intellectual property. Aerospace industry requires highly reliable data acquisition systems. Traditional Acquisition systems employ end-to-end hardware and software redundancy. Typically, redundancy adds weight, cost, power consumption, and complexity.

  8. 48 CFR 605.207-70 - Acquisitions available from only one responsible source.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopsis of Proposed Contract Actions 605.207-70 Acquisitions available from only one responsible source. In addition to the... and the information a potential source must submit. [53 FR 26164, July 11, 1988, as amended at 69 FR...

  9. EXPECT: Explicit Representations for Flexible Acquisition

    NASA Technical Reports Server (NTRS)

    Swartout, BIll; Gil, Yolanda

    1995-01-01

    To create more powerful knowledge acquisition systems, we not only need better acquisition tools, but we need to change the architecture of the knowledge based systems we create so that their structure will provide better support for acquisition. Current acquisition tools permit users to modify factual knowledge but they provide limited support for modifying problem solving knowledge. In this paper, the authors argue that this limitation (and others) stem from the use of incomplete models of problem-solving knowledge and inflexible specification of the interdependencies between problem-solving and factual knowledge. We describe the EXPECT architecture which addresses these problems by providing an explicit representation for problem-solving knowledge and intent. Using this more explicit representation, EXPECT can automatically derive the interdependencies between problem-solving and factual knowledge. By deriving these interdependencies from the structure of the knowledge-based system itself EXPECT supports more flexible and powerful knowledge acquisition.

  10. 48 CFR 307.7108 - Statement of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Statement of work. 307... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW describes the work or services a contractor is to perform in reaching an end result without describing the...

  11. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1989-01-01

    Developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. Activities of the Deep Space Network and its associated Ground Communications Facility in planning, in supporting research and technology, in implementation, and in operations are reported in space communications, radio navigation, radio science, and ground-based radio and radar astronomy.

  12. Strategic Planning and Management in Defense Systems Acquisition

    DTIC Science & Technology

    2013-10-01

    to Dr. John Bryson (2010), offers many benefits to public-sector organizations: • Promotes strategic thinking, acting, and learning; • Improves...and with strategic planning in particular—and has proven its value (Barzelay & Campbell, 2003; Berman & West, 1998; Berry & Wechsler, 1995; Boyne ...national survey. Public Administration Review, 55(2), 159–68. Boyne , G. A., & Gould-Williams, J. (2003). Planning and performance in public organizations

  13. Mergers and acquisitions involving equine veterinary practices.

    PubMed

    Jackman, Brad R; McCafferty, Owen E

    2009-12-01

    This article discusses mergers and acquisitions involving equine veterinary practices. Combining practices can be professionally and economically advantageous but requires a great deal of thought, planning, and implementation. If due diligence is performed and true business teamwork is undertaken, the benefits can be enormous and rewarding.

  14. Impact of Merger and Acquisition on University Performance.

    PubMed

    Mohamadi Bolbanabad, Amjad; Mosadeghrad, Ali Mohammad; Arab, Mohammad; Majdzadeh, Reza

    2017-08-01

    Merger and acquisitions (M&A) widen access to higher education, improve quality of teaching and research, and increase efficiency of higher education institutions. Three big medical universities in Iran merged in 2010. The purpose of this study was to highlight the impact of this acquisition on the performance of Tehran University of Medical Sciences. This qualitative study was conducted using semi-structured in-depth interviews with 60 participants from April 2015 to November 2015. Purposeful sampling was used to recruit participants. Data analysis was performed using MAXQDA software (V. 10). The reasons for acquisition of IUMS by TUMS were to enhance the position of TUMS worldwide, and to increase its efficiency. The acquisition improved the organization and management of the newly formed TUMS, enhanced its academic position and market recognition. However, the achieved benefits did not come without shortcomings and unanticipated consequences. The merger and acquisition in higher education has some advantages and disadvantages. A well planned and carefully implemented M&A gives cutting edge to the higher education institutes.

  15. Advanced Data Acquisition Systems with Self-Healing Circuitry

    NASA Technical Reports Server (NTRS)

    Larson, William E.; Ihlefeld, Curtis M.; Medelius, Pedro J.; Delgado, H. (Technical Monitor)

    2001-01-01

    Kennedy Space Center's Spaceport Engineering & Technology Directorate has developed a data acquisition system that will help drive down the cost of ground launch operations. This system automates both the physical measurement set-up function as well as configuration management documentation. The key element of the system is a self-configuring, self-calibrating, signal-conditioning amplifier that automatically adapts to any sensor to which it is connected. This paper will describe the core technology behind this device and the automated data system in which it has been integrated. The paper will also describe the revolutionary enhancements that are planned for this innovative measurement technology. All measurement electronics devices contain circuitry that, if it fails or degrades, requires the unit to be replaced, adding to the cost of operations. Kennedy Space Center is now developing analog circuits that will be able to detect their own failure and dynamically reconfigure their circuitry to restore themselves to normal operation. This technology will have wide ranging application in all electronic devices used in space and ground systems.

  16. Second Language Acquisition Research and Second Language Teaching.

    ERIC Educational Resources Information Center

    Corder, S. Pit

    1985-01-01

    Discusses second language acquisition, the importance of comprehensible input to this acquisition, and the inadequacy of the theory of language interference as an explanation for errors in second language speech. The role of the teacher in the language classroom and the "procedural syllabus" are described. (SED)

  17. An agile acquisition decision-support workbench for evaluating ISR effectiveness

    NASA Astrophysics Data System (ADS)

    Stouch, Daniel W.; Champagne, Valerie; Mow, Christopher; Rosenberg, Brad; Serrin, Joshua

    2011-06-01

    The U.S. Air Force is consistently evolving to support current and future operations through the planning and execution of intelligence, surveillance and reconnaissance (ISR) missions. However, it is a challenge to maintain a precise awareness of current and emerging ISR capabilities to properly prepare for future conflicts. We present a decisionsupport tool for acquisition managers to empirically compare ISR capabilities and approaches to employing them, thereby enabling the DoD to acquire ISR platforms and sensors that provide the greatest return on investment. We have developed an analysis environment to perform modeling and simulation-based experiments to objectively compare alternatives. First, the analyst specifies an operational scenario for an area of operations by providing terrain and threat information; a set of nominated collections; sensor and platform capabilities; and processing, exploitation, and dissemination (PED) capacities. Next, the analyst selects and configures ISR collection strategies to generate collection plans. The analyst then defines customizable measures of effectiveness or performance to compute during the experiment. Finally, the analyst empirically compares the efficacy of each solution and generates concise reports to document their conclusions, providing traceable evidence for acquisition decisions. Our capability demonstrates the utility of using a workbench environment for analysts to design and run experiments. Crafting impartial metrics enables the acquisition manager to focus on evaluating solutions based on specific military needs. Finally, the metric and collection plan visualizations provide an intuitive understanding of the suitability of particular solutions. This facilitates a more agile acquisition strategy that handles rapidly changing technology in response to current military needs.

  18. On the reproducibility of expert-operated and robotic ultrasound acquisitions.

    PubMed

    Kojcev, Risto; Khakzar, Ashkan; Fuerst, Bernhard; Zettinig, Oliver; Fahkry, Carole; DeJong, Robert; Richmon, Jeremy; Taylor, Russell; Sinibaldi, Edoardo; Navab, Nassir

    2017-06-01

    We present the evaluation of the reproducibility of measurements performed using robotic ultrasound imaging in comparison with expert-operated sonography. Robotic imaging for interventional procedures may be a valuable contribution, but requires reproducibility for its acceptance in clinical routine. We study this by comparing repeated measurements based on robotic and expert-operated ultrasound imaging. Robotic ultrasound acquisition is performed in three steps under user guidance: First, the patient is observed using a 3D camera on the robot end effector, and the user selects the region of interest. This allows for automatic planning of the robot trajectory. Next, the robot executes a sweeping motion following the planned trajectory, during which the ultrasound images and tracking data are recorded. As the robot is compliant, deviations from the path are possible, for instance due to patient motion. Finally, the ultrasound slices are compounded to create a volume. Repeated acquisitions can be performed automatically by comparing the previous and current patient surface. After repeated image acquisitions, the measurements based on acquisitions performed by the robotic system and expert are compared. Within our case series, the expert measured the anterior-posterior, longitudinal, transversal lengths of both of the left and right thyroid lobes on each of the 4 healthy volunteers 3 times, providing 72 measurements. Subsequently, the same procedure was performed using the robotic system resulting in a cumulative total of 144 clinically relevant measurements. Our results clearly indicated that robotic ultrasound enables more repeatable measurements. A robotic ultrasound platform leads to more reproducible data, which is of crucial importance for planning and executing interventions.

  19. 48 CFR 1052.219-71 - Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting Plan. 1052... Subcontracting Plan. As prescribed in DTAR 1019.708-70(b), insert the following provision: Subcontracting Plan (MAR 2002) As part of its initial proposal, each large business offeror must submit a contracting plan...

  20. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    Archival reports on developments in programs managed by JPL's office of Telecommunications and Data Acquisition (TDA) are presented. In space communications, radio navigation, radio science, and ground-based radio astronomy, it reports on activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, in supporting research and technology, in implementation, and in operations.

  1. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  2. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  3. Automated Data Assimilation and Flight Planning for Multi-Platform Observation Missions

    NASA Technical Reports Server (NTRS)

    Oza, Nikunj; Morris, Robert A.; Strawa, Anthony; Kurklu, Elif; Keely, Leslie

    2008-01-01

    This is a progress report on an effort in which our goal is to demonstrate the effectiveness of automated data mining and planning for the daily management of Earth Science missions. Currently, data mining and machine learning technologies are being used by scientists at research labs for validating Earth science models. However, few if any of these advanced techniques are currently being integrated into daily mission operations. Consequently, there are significant gaps in the knowledge that can be derived from the models and data that are used each day for guiding mission activities. The result can be sub-optimal observation plans, lack of useful data, and wasteful use of resources. Recent advances in data mining, machine learning, and planning make it feasible to migrate these technologies into the daily mission planning cycle. We describe the design of a closed loop system for data acquisition, processing, and flight planning that integrates the results of machine learning into the flight planning process.

  4. LANDSAT-D ground segment operations plan, revision A

    NASA Technical Reports Server (NTRS)

    Evans, B.

    1982-01-01

    The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.

  5. Intelligent transportation systems Professional Capacity Building Program : planning and deploying ITS : six white papers describing current and planned programs of five transportation associations and four university ITS Research Centers of Excellence

    DOT National Transportation Integrated Search

    1997-12-01

    In the fall of 1997, the ITS Professional Capacity Building Program initiated the development of six White Papers to briefly describe the current status of, and plans for future education and training activities of six organizations engaged in ...

  6. 4 NCIC Data Acquisition Guide

    USGS Publications Warehouse

    ,

    1979-01-01

    The National Cartographic Information Center (NCIC) is the information branch of the National Mapping Program. NCIC gathers descriptions of cartographic products held by Federal, State and local agencies, and private companies. Computerized information systems are used to edit, store, and distribute these descriptions. The Aerial Photography Summary Record System (APSRS) is NCIC's system for determining if photographs of a particular area, with a particular set of characteristics, are available, and if so, where they can be found. This guide defines the procedures for planning and conducting visits to potential contributors to the APSRS data base. The guide also defines acquisition responsibilities of the contributor, State affiliates, mapping centers, and NCIC headquarters. As a Data Acquisition specialist, you are encouraged to seek innovative approaches to acquiring data and to suggest additions or changes to this guide.

  7. 48 CFR 3028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Group insurance plans. 3028.307-1 Section 3028.307-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... advice of legal counsel. ...

  8. 48 CFR 212.570 - Applicability of certain laws to contracts and subcontracts for the acquisition of commercially...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to.... 2533b, Requirement to buy strategic materials critical to national security from American sources, is...

  9. 48 CFR 212.570 - Applicability of certain laws to contracts and subcontracts for the acquisition of commercially...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to.... 2533b, Requirement to buy strategic materials critical to national security from American sources, is...

  10. Navy Manpower Planning

    DTIC Science & Technology

    2017-03-31

    requirements based on valid, approved workload. • Link peacetime and mobilization manpower requirements. 16 Moreover, the purpose of the SMRD is to... research and policy; energy and environment; manpower management; acquisition and cost; infrastructure; and military readiness . CPP-2017 -U-015038-Final...CNA ANALYSIS & SOLUTIONS 31st March 2017 Subject: NAVY MANPOWER PLANNING MONOGRAPH Navy manpower planning is a rich and complex topic that has a

  11. Improved Acquisition for System Sustainment: Availability-Based Importance Framework for Maintenance, Repair, and Overhaul Acquisition

    DTIC Science & Technology

    2015-06-30

    when these equipment failures cause some of the worst accidents and environmental damages in human history such as the March 2011 Fukushima Nuclear ...ultimately facilitate the MRO acquisition process through effective maintenance triggers and supplier selection Task 2. Stochastic Availability Importance...dollars with a replacement plan lasting for several decades [GAO 2004]. A budget reduction of about 29 percent since 1990 has “forced the branches of the

  12. Development of a light-weight, wind-turbine-rotor-based data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, D.E.; Rumsey, M.; Robertson, P.

    1997-12-01

    Wind-energy researchers at Sandia National Laboratories (SNL) and the National Renewable Energy Laboratory (NREL) are developing a new, light-weight, modular system capable of acquiring long-term, continuous time-series data from current-generation small or large, dynamic wind-turbine rotors. Meetings with wind-turbine research personnel at NREL and SNL resulted in a list of the major requirements that the system must meet. Initial attempts to locate a commercial system that could meet all of these requirements were not successful, but some commercially available data acquisition and radio/modem subsystems that met many of the requirements were identified. A time synchronization subsystem and a programmable logicmore » device subsystem to integrate the functions of the data acquisition, the radio/modem, and the time synchronization subsystems and to communicate with the user have been developed at SNL. This paper presents the data system requirements, describes the four major subsystems comprising the system, summarizes the current status of the system, and presents the current plans for near-term development of hardware and software.« less

  13. Executing on Integration: The Key to Success in Mergers and Acquisitions.

    PubMed

    Bradley, Carol

    2016-01-01

    Health care mergers and acquisitions require a clearly stated vision and exquisite planning of integration activities to provide the best possible conditions for a successful transaction. During the due diligence process, key steps can be taken to create a shared vision and a plan to inspire confidence and build enthusiasm for all stakeholders. Integration planning should include a defined structure, roles and responsibilities, as well as a method for evaluation.

  14. Glossary: Defense Acquisition Acronyms and Terms. 4th Edition

    DTIC Science & Technology

    1989-10-01

    Appropriations Committee R HARDMAN Manpower Planning for Hardware (Navy/USMC) HASC House Armed Services Committee 11 HBC House Budget Committee R HCA Head of...Logistics Review Group (Navy) LRIP Low Rate Initial Production LRP Low Rate Production LRRDAP Long Range Research, Development and Acquisition Plan...Software User’s Manual R SUPSHIPS Superintendent of Shipbuilding S/V Survivability/Vulnerability SVR Shop Visit Rate R SW or S/W Software SX Systems

  15. TFTR diagnostic control and data acquisition system

    NASA Astrophysics Data System (ADS)

    Sauthoff, N. R.; Daniels, R. E.

    1985-05-01

    General computerized control and data-handling support for TFTR diagnostics is presented within the context of the Central Instrumentation, Control and Data Acquisition (CICADA) System. Procedures, hardware, the interactive man-machine interface, event-driven task scheduling, system-wide arming and data acquisition, and a hierarchical data base of raw data and results are described. Similarities in data structures involved in control, monitoring, and data acquisition afford a simplification of the system functions, based on ``groups'' of devices. Emphases and optimizations appropriate for fusion diagnostic system designs are provided. An off-line data reduction computer system is under development.

  16. TFTR diagnostic control and data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sauthoff, N.R.; Daniels, R.E.; PPL Computer Division

    1985-05-01

    General computerized control and data-handling support for TFTR diagnostics is presented within the context of the Central Instrumentation, Control and Data Acquisition (CICADA) System. Procedures, hardware, the interactive man--machine interface, event-driven task scheduling, system-wide arming and data acquisition, and a hierarchical data base of raw data and results are described. Similarities in data structures involved in control, monitoring, and data acquisition afford a simplification of the system functions, based on ''groups'' of devices. Emphases and optimizations appropriate for fusion diagnostic system designs are provided. An off-line data reduction computer system is under development.

  17. Adult Second Language Acquisition: Laotian Hmong in Southland.

    ERIC Educational Resources Information Center

    Lert, Erika Nagy

    The study described in this paper focuses on English language acquisition by adult Hmong Laotian immigrants in an English as a Second Language (ESL) program in a city in the Northeastern United States. Preexistent levels of literacy and second language familiarity are discounted as influences on the speed of students' acquisition of language.…

  18. 75 FR 25159 - Defense Federal Acquisition Regulation Supplement; Preservation of Tooling for Major Defense...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Authorization Act for Fiscal Year 2009. Section 815 requires acquisition plans for major weapons systems to... hardware for major defense acquisition programs through the end of the service life of the related weapons... affects all contracts for major weapons that will require special tooling associated with the production...

  19. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Hurricane plan. 1852.236-73 Section 1852.236-73 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION...; (c) Clear all surrounding areas and roofs of buildings, or tie down loose material, equipment, debris...

  20. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Hurricane plan. 1852.236-73 Section 1852.236-73 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE..., equipment, debris, and any other objects that could otherwise be blown away or blown against existing...

  1. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Hurricane plan. 1852.236-73 Section 1852.236-73 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE..., equipment, debris, and any other objects that could otherwise be blown away or blown against existing...

  2. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Hurricane plan. 1852.236-73 Section 1852.236-73 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE..., equipment, debris, and any other objects that could otherwise be blown away or blown against existing...

  3. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Hurricane plan. 1852.236-73 Section 1852.236-73 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE..., equipment, debris, and any other objects that could otherwise be blown away or blown against existing...

  4. Acquisition Streamlining

    DTIC Science & Technology

    1986-12-01

    perform its mission when called upon to do so, as evidenced by the aborted Iranian hostage rescue. The scenario described has been a low point in the...National Maintenance Point , U.S. Army Security Agency Materiel Support Command, and Charles A . McCarthy, stated in 1976, that the specification for...integral Part of the acquisition process (Ref. 2]. In a memorandum dated December 4, 1984, Mr. Taft identi- fied as the point of contact for the office of

  5. Acquisition of Scientific Literature in Developing Countries. 3: Pakistan.

    ERIC Educational Resources Information Center

    Haider, Syed Jalaluddin

    1989-01-01

    Summarizes the development of science and technology in Pakistan and the existing library resources in science and technology. The organization of acquisitions work is described, including acquisitions policy, book selection, financial support, procurement of books and periodicals, import restrictions, book order work, and gifts and exchanges.…

  6. 48 CFR 1426.7102 - Minority Business Development Agency (MBDA-91) Plan and Reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Reports 1426.7102 Minority Business Development Agency (MBDA-91) Plan and Reports. ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Minority Business Development Agency (MBDA-91) Plan and Reports. 1426.7102 Section 1426.7102 Federal Acquisition Regulations...

  7. 40 CFR 300.1105 - Involuntary acquisition of property by the government.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS... transfers or acquisitions pursuant to abandonment proceedings, or as the result of tax delinquency, or...

  8. Coordinating Council. Second Meeting: International Acquisitions

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The theme of this NASA Scientific and Technical Information Program Coordinating Council was International Acquisitions. Included are both visuals for presentations and reports on discussions related to the topics. Presentations were made on the following topics: Coordination council organization international plan, STI global network, International aerospace climate, Foreign exchange program, Foreign activities RMS & AIAA, NASA translation program, A.F. machine translation system, and CIRC cooperation.

  9. Positron Emission Mammography with Multiple Angle Acquisition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark F. Smith; Stan Majewski; Raymond R. Raylman

    2002-11-01

    Positron emission mammography (PEM) of F-18 fluorodeoxyglucose (FbG) uptake in breast tumors with dedicated detectors typically has been accomplished with two planar detectors in a fixed position with the breast under compression. The potential use of PEM imaging at two detector positions to guide stereotactic breast biopsy has motivated us to use PEM coincidence data acquired at two or more detector positions together in a single image reconstruction. Multiple angle PEM acquisition and iterative image reconstruction were investigated using point source and compressed breast phantom acquisitions with 5, 9, 12 and 15 mm diameter spheres and a simulated tumor:background activitymore » concentration ratio of 6:1. Image reconstruction was performed with an iterative MLEM algorithm that used coincidence events between any two detector pixels on opposed detector heads at each detector position. This present study compared two acquisition protocols: 2 angle acquisition with detector angular positions of -15 and +15 degrees and 11 angle acquisition with detector positions spaced at 3 degree increments over the range -15 to +15 degrees. Three-dimensional image resolution was assessed for the point source acquisitions, and contrast and signal-to-noise metrics were evaluated for the compressed breast phantom with different simulated tumor sizes. Radial and tangential resolutions were similar for the two protocols, while normal resolution was better for the 2 angle acquisition. Analysis is complicated by the asymmetric point spread functions. Signal- to-noise vs. contrast tradeoffs were better for 11 angle acquisition for the smallest visible 9 mm sphere, while tradeoff results were mixed for the larger and more easily visible 12 mm and 15 mm diameter spheres. Additional study is needed to better understand the performance of limited angle tomography for PEM. PEM tomography experiments with complete angular sampling are planned.« less

  10. Combining factual and heuristic knowledge in knowledge acquisition

    NASA Technical Reports Server (NTRS)

    Gomez, Fernando; Hull, Richard; Karr, Clark; Hosken, Bruce; Verhagen, William

    1992-01-01

    A knowledge acquisition technique that combines heuristic and factual knowledge represented as two hierarchies is described. These ideas were applied to the construction of a knowledge acquisition interface to the Expert System Analyst (OPERA). The goal of OPERA is to improve the operations support of the computer network in the space shuttle launch processing system. The knowledge acquisition bottleneck lies in gathering knowledge from human experts and transferring it to OPERA. OPERA's knowledge acquisition problem is approached as a classification problem-solving task, combining this approach with the use of factual knowledge about the domain. The interface was implemented in a Symbolics workstation making heavy use of windows, pull-down menus, and other user-friendly devices.

  11. Increasingly automated procedure acquisition in dynamic systems

    NASA Technical Reports Server (NTRS)

    Mathe, Nathalie; Kedar, Smadar

    1992-01-01

    Procedures are widely used by operators for controlling complex dynamic systems. Currently, most development of such procedures is done manually, consuming a large amount of paper, time, and manpower in the process. While automated knowledge acquisition is an active field of research, not much attention has been paid to the problem of computer-assisted acquisition and refinement of complex procedures for dynamic systems. The Procedure Acquisition for Reactive Control Assistant (PARC), which is designed to assist users in more systematically and automatically encoding and refining complex procedures. PARC is able to elicit knowledge interactively from the user during operation of the dynamic system. We categorize procedure refinement into two stages: diagnosis - diagnose the failure and choose a repair - and repair - plan and perform the repair. The basic approach taken in PARC is to assist the user in all steps of this process by providing increased levels of assistance with layered tools. We illustrate the operation of PARC in refining procedures for the control of a robot arm.

  12. War-gaming application for future space systems acquisition part 2: acquisition and bidding war-gaming modeling and simulation approaches for FFP and FPIF

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes cooperative and non-cooperative static Bayesian game models with complete and incomplete information for the development of optimum acquisition strategies associated with the Program and Technical Baseline (PTB) solutions obtained from Part 1 of this paper [1]. The optimum acquisition strategies discussed focus on achieving "Affordability" by incorporating contractors' bidding strategies into the government acquisition strategies for acquiring future space systems. The paper discusses System Engineering (SE) frameworks, analytical and simulation approaches and modeling for developing the optimum acquisition strategies from both the government and contractor perspectives for Firm Fixed Price (FFP) and Fixed Price Incentive Firm (FPIF) contract types.

  13. Data Acquisition System(DAS) Sustaining Engineering

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This paper presents general information describing the Data Acquisition System contract, a summary of objectives, tasks performed and completed. The hardware deliverables which are comprised of: 1) Two ground DAS units; 2) Two flight DAS units; 3) Logistic spares; and 4) Shipping containers are described. Also included are the data requirements and scope of the contract.

  14. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  15. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  16. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  17. Incident reporting: Its role in aviation safety and the acquisition of human error data

    NASA Technical Reports Server (NTRS)

    Reynard, W. D.

    1983-01-01

    The rationale for aviation incident reporting systems is presented and contrasted to some of the shortcomings of accident investigation procedures. The history of the United State's Aviation Safety Reporting System (ASRS) is outlined and the program's character explained. The planning elements that resulted in the ASRS program's voluntary, confidential, and non-punitive design are discussed. Immunity, from enforcement action and misuse of the volunteered data, is explained and evaluated. Report generation techniques and the ASRS data analysis process are described; in addition, examples of the ASRS program's output and accomplishments are detailed. Finally, the value of incident reporting for the acquisition of safety information, particularly human error data, is explored.

  18. 48 CFR 1028.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL... submitted to the CO, who must obtain the advice of legal counsel. ...

  19. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  20. Notification: Methods for Procuring Supplies and Services Under Simplified Acquisition Procedures

    EPA Pesticide Factsheets

    Project #OA-FY15-0193, June 18, 2015. The EPA OIG plans to begin the preliminary research phase of auditing the methods used in procuring supplies and services under simplified acquisition procedures.

  1. 48 CFR 2452.216-73 - Performance evaluation plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Performance evaluation plan... 2452.216-73 Performance evaluation plan. As prescribed in 2416.406(e)(3), insert the following clause in all award fee contracts: Performance Evaluation Plan (AUG 1987) (a) The Government shall...

  2. 48 CFR 3052.216-72 - Performance evaluation plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Performance evaluation... CONTRACT CLAUSES Text of Provisions and Clauses 3052.216-72 Performance evaluation plan. As prescribed in... Evaluation Plan (DEC 2003) (a) A Performance Evaluation Plan shall be unilaterally established by the...

  3. 48 CFR 1252.216-72 - Performance evaluation plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance evaluation....216-72 Performance evaluation plan. As prescribed in (TAR) 48 CFR 1216.406(b), insert the following clause: Performance Evaluation Plan (OCT 1994) (a) A Performance Evaluation Plan shall be unilaterally...

  4. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  5. 48 CFR 28.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Group insurance plans. 28... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 28.307-1 Group insurance plans. (a) Prior approval requirement. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the...

  6. 48 CFR 28.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Group insurance plans. 28... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 28.307-1 Group insurance plans. (a) Prior approval requirement. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the...

  7. 48 CFR 1228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Group insurance plans... GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1228.307-1 Group insurance plans. (a) Prior... basis on proposed purchases of group insurance plans. Legal advice should be sought where necessary on...

  8. 48 CFR 28.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Group insurance plans. 28... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 28.307-1 Group insurance plans. (a) Prior approval requirement. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the...

  9. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  10. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  11. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  12. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  13. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  14. 48 CFR 1228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Group insurance plans... GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1228.307-1 Group insurance plans. (a) Prior... basis on proposed purchases of group insurance plans. Legal advice should be sought where necessary on...

  15. 48 CFR 28.307-1 - Group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Group insurance plans. 28... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 28.307-1 Group insurance plans. (a) Prior approval requirement. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the...

  16. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  17. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  18. 48 CFR 1228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Group insurance plans... GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1228.307-1 Group insurance plans. (a) Prior... basis on proposed purchases of group insurance plans. Legal advice should be sought where necessary on...

  19. 48 CFR 1228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Group insurance plans... GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1228.307-1 Group insurance plans. (a) Prior... basis on proposed purchases of group insurance plans. Legal advice should be sought where necessary on...

  20. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  1. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Group insurance plans. 2828... Contracting Requirements BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...

  2. 48 CFR 31.205-12 - Economic planning costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Economic planning costs... Organizations 31.205-12 Economic planning costs. Economic planning costs are the costs of general long-range... that may take into account the eventual possibility of economic dislocations or fundamental alterations...

  3. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...

  4. 48 CFR 31.205-12 - Economic planning costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Economic planning costs... Organizations 31.205-12 Economic planning costs. Economic planning costs are the costs of general long-range... that may take into account the eventual possibility of economic dislocations or fundamental alterations...

  5. 48 CFR 31.205-12 - Economic planning costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Economic planning costs... Organizations 31.205-12 Economic planning costs. Economic planning costs are the costs of general long-range... that may take into account the eventual possibility of economic dislocations or fundamental alterations...

  6. 48 CFR 31.205-12 - Economic planning costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Economic planning costs... Organizations 31.205-12 Economic planning costs. Economic planning costs are the costs of general long-range... that may take into account the eventual possibility of economic dislocations or fundamental alterations...

  7. 48 CFR 31.205-12 - Economic planning costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Economic planning costs... Organizations 31.205-12 Economic planning costs. Economic planning costs are the costs of general long-range... that may take into account the eventual possibility of economic dislocations or fundamental alterations...

  8. The new classic data acquisition system for NPOI

    NASA Astrophysics Data System (ADS)

    Sun, B.; Jorgensen, A. M.; Landavazo, M.; Hutter, D. J.; van Belle, G. T.; Mozurkewich, David; Armstrong, J. T.; Schmitt, H. R.; Baines, E. K.; Restaino, S. R.

    2014-07-01

    The New Classic data acquisition system is an important portion of a new project of stellar surface imaging with the NPOI, funded by the National Science Foundation, and enables the data acquisition necessary for the project. The NPOI can simultaneously deliver beams from 6 telescopes to the beam combining facility, and in the Classic beam combiner these are combined 4 at a time on 3 separate spectrographs with all 15 possible baselines observed. The Classic data acquisition system is limited to 16 of 32 wavelength channels on two spectrographs and limited to 30 s integrations followed by a pause to ush data. Classic also has some limitations in its fringe-tracking capability. These factors, and the fact that Classic incorporates 1990s technology which cannot be easily replaced are motivation for upgrading the data acquisition system. The New Classic data acquisition system is based around modern electronics, including a high-end Stratix FPGA, a 200 MB/s Direct Memory Access card, and a fast modern Linux computer. These allow for continuous recording of all 96 channels across three spectrographs, increasing the total amount of data recorded by a an estimated order of magnitude. The additional computing power on the data acquisition system also allows for the implementation of more sophisticated fringe-tracking algorithms which are needed for the Stellar Surface Imaging project. In this paper we describe the New Classic system design and implementation, describe the background and motivation for the system as well as show some initial results from using it.

  9. Quality Assurance Project Plan - Modeling the Impact of Hydraulic Fracturing on Water Resources Based on Water Acquisition Scenarios

    EPA Pesticide Factsheets

    This planning document describes the quality assurance/quality control activities and technical requirements that will be used during the research study. The goal of this project is to evaluate the potential impacts of large volume water withdrawals.

  10. Coast Guard Acquisitions: Enhanced Oversight of Testing Could Benefit National Security Cutter Program and Future DHS Acquisitions

    DTIC Science & Technology

    2016-02-03

    Response Cutter program and plans for its upcoming Offshore Patrol Cutter program, that the Coast Guard has matured its acquisition process. The process to...Cutter and Offshore Patrol Cutter programs. GAO reviewed these two programs in June 2014 (GAO-14-450) and April 2015 (GAO- 15-171SP) and also...Government Accountability Office areas of competition and the schedule for initial testing. Furthermore, as the $12 billion Offshore Patrol Cutter program

  11. Tracking and data system support for the Viking 1975 mission to Mars. Volume 1: Prelaunch planning, implementation, and testing

    NASA Technical Reports Server (NTRS)

    Mudgway, D. J.; Traxler, M. R.

    1977-01-01

    The tracking and data acquisition support for the 1975 Viking Missions to Mars is described. The history of the effort from its inception in late 1968 through the launches of Vikings 1 and 2 from Cape Kennedy in August and September 1975 is given. The Viking mission requirements for tracking and data acquisition support in both the near earth and deep space phases involved multiple radar tracking and telemetry stations, and communications networks together with the global network of tracking stations, communications, and control center. The planning, implementation, testing and management of the program are presented.

  12. Astronomical Interlibrary Cooperation: The Long and Difficult Plan for Coordinated Acquisition of Journals -- the Italian Case

    NASA Astrophysics Data System (ADS)

    Gasperini, A.; Abrami, L.; Olostro Cirella, E.

    2007-10-01

    Until 2002, the Italian astronomical observatories were independent research institutes. Their libraries, though different in their origins and history, shared common bibliographical materials, users and aims. This situation prompted a first experience of unofficial cooperation between astronomical observatory libraries, which produced outstanding results, in particular a detailed survey of the nature, cost and use of scientific journals. Starting from 2002, when the 12 observatories merged into a single institution, the National Institute for Astrophysics (INAF), the experience of cooperation between the libraries became official. The INAF headquarters, in fact, has recently established the Library Documentary and Archive Service of the National Institute for Astrophysics (SBDA-INAF) in order to have a centralized astronomical bibliographical service and to promote cooperation among libraries. At the end of 2004, following the INAF rearrangement, 5 Institutes of the National Research Council (CNR) joined the still new organization introducing further complications. In this work we explain all the problems faced by a working group to elaborate an efficient plan of coordinated acquisition of journals: the difficulties in coordinating 17 different sites distributed over the whole national territory, the not so easy negotiation with the publishers, the choice between e-only or print & online and, last but not least, the psychological impact on the scientific community. The cooperation among Italian astronomical libraries was a plan begun many years ago and has continued through various events over the years. This presentation takes into consideration the various stages of our project focusing on some crucial aspects.

  13. Buffer Gas Acquisition and Storage

    NASA Technical Reports Server (NTRS)

    Parrish, Clyde F.; Lueck, Dale E.; Jennings, Paul A.; Callahan, Richard A.; Delgado, H. (Technical Monitor)

    2001-01-01

    The acquisition and storage of buffer gases (primarily argon and nitrogen) from the Mars atmosphere provides a valuable resource for blanketing and pressurizing fuel tanks and as a buffer gas for breathing air for manned missions. During the acquisition of carbon dioxide (CO2), whether by sorption bed or cryo-freezer, the accompanying buffer gases build up in the carbon dioxide acquisition system, reduce the flow of CO2 to the bed, and lower system efficiency. It is this build up of buffer gases that provide a convenient source, which must be removed, for efficient capture Of CO2 Removal of this buffer gas barrier greatly improves the charging rate of the CO2 acquisition bed and, thereby, maintains the fuel production rates required for a successful mission. Consequently, the acquisition, purification, and storage of these buffer gases are important goals of ISRU plans. Purity of the buffer gases is a concern e.g., if the CO, freezer operates at 140 K, the composition of the inert gas would be approximately 21 percent CO2, 50 percent nitrogen, and 29 percent argon. Although there are several approaches that could be used, this effort focused on a hollow-fiber membrane (HFM) separation method. This study measured the permeation rates of CO2, nitrogen (ND, and argon (Ar) through a multiple-membrane system and the individual membranes from room temperature to 193K and 10 kpa to 300 kPa. Concentrations were measured with a gas chromatograph that used a thermoconductivity (TCD) detector with helium (He) as the carrier gas. The general trend as the temperature was lowered was for the membranes to become more selective, In addition, the relative permeation rates between the three gases changed with temperature. The end result was to provide design parameters that could be used to separate CO2 from N2 and Ar.

  14. 26 CFR 1.401(m)-4 - Special rules for mergers, acquisitions and similar events. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Special rules for mergers, acquisitions and similar events. [Reserved] 1.401(m)-4 Section 1.401(m)-4 Internal Revenue INTERNAL REVENUE SERVICE... Bonus Plans, Etc. § 1.401(m)-4 Special rules for mergers, acquisitions and similar events. [Reserved] ...

  15. Environmental Scanning: Acquisition and Use of Information by Managers.

    ERIC Educational Resources Information Center

    Choo, Chun Wei; Auster, Ethel

    1993-01-01

    Defines environmental scanning as the acquisition and use of information about an organization's external environment to assist managers in planning. Highlights include a historical review; organizational theories; information needs and uses; managers as information users; and a review of research on environmental scanning. (Contains 124…

  16. Mergers and Acquisitions-1998 M&A: The Year in Review.

    ERIC Educational Resources Information Center

    Defendeifer, Linda

    1999-01-01

    Discusses mergers and acquisitions in the publishing industry, including alliances among the largest publishers and printers; planned and abandoned deals; issues in academia, including rising scholarly journal prices and electronic journals; smaller firm alliances; magazine publishing; and newspaper consolidations. (LRW)

  17. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    NASA Astrophysics Data System (ADS)

    Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.

    2008-07-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.

  18. Library Bulletin, International Planned Parenthood Federation.

    ERIC Educational Resources Information Center

    International Planned Parenthood Federation, London (England).

    The current issue of the International Planned Parenthood Federation (IPPF) Library Bulletin combines an acquisitions list with that of special bibliographies. The broad classes follow the IPPF general organization by topics: (1) general reference, (2) IPPF, (3) family planning and maternal and child health and care, (4) bio-medical study and…

  19. Data acquisition system for segmented reactor antineutrino detector

    NASA Astrophysics Data System (ADS)

    Hons, Z.; Vlášek, J.

    2017-01-01

    This paper describes the data acquisition system used for data readout from the PMT channels of a segmented detector of reactor antineutrinos with active shielding. Theoretical approach to the data acquisition is described and two possible solutions using QDCs and digitizers are discussed. Also described are the results of the DAQ performance during routine data taking operation of DANSS. DANSS (Detector of the reactor AntiNeutrino based on Solid Scintillator) is a project aiming to measure a spectrum of reactor antineutrinos using inverse beta decay (IBD) in a plastic scintillator. The detector is located close to an industrial nuclear reactor core and is covered by passive and active shielding. It is expected to have about 15000 IBD interactions per day. Light from the detector is sensed by PMT and SiPM.

  20. Performance-Based Service Acquisition (PBSA) Study and Graduate Level Course Material

    DTIC Science & Technology

    2005-12-01

    Realizing Marketplace Potential, Acquisition Solutions, Inc (Advisory), February 2001 Dickson, Bob, March 10, 2003. Federal 7 Contract Law : Feds...Management and Policy Federal Contract Law : Feds should use market research to refine IT plans Session 4: The Performance Requirements and...March 10, 2003. Federal Contract Law : Feds should use market research to refine IT plans, Post-Newsweek Media, Inchttp://appserv.gcn.com/cgi- bin/udt

  1. Path Planning Algorithms for the Adaptive Sensor Fleet

    NASA Technical Reports Server (NTRS)

    Stoneking, Eric; Hosler, Jeff

    2005-01-01

    The Adaptive Sensor Fleet (ASF) is a general purpose fleet management and planning system being developed by NASA in coordination with NOAA. The current mission of ASF is to provide the capability for autonomous cooperative survey and sampling of dynamic oceanographic phenomena such as current systems and algae blooms. Each ASF vessel is a software model that represents a real world platform that carries a variety of sensors. The OASIS platform will provide the first physical vessel, outfitted with the systems and payloads necessary to execute the oceanographic observations described in this paper. The ASF architecture is being designed for extensibility to accommodate heterogenous fleet elements, and is not limited to using the OASIS platform to acquire data. This paper describes the path planning algorithms developed for the acquisition phase of a typical ASF task. Given a polygonal target region to be surveyed, the region is subdivided according to the number of vessels in the fleet. The subdivision algorithm seeks a solution in which all subregions have equal area and minimum mean radius. Once the subregions are defined, a dynamic programming method is used to find a minimum-time path for each vessel from its initial position to its assigned region. This path plan includes the effects of water currents as well as avoidance of known obstacles. A fleet-level planning algorithm then shuffles the individual vessel assignments to find the overall solution which puts all vessels in their assigned regions in the minimum time. This shuffle algorithm may be described as a process of elimination on the sorted list of permutations of a cost matrix. All these path planning algorithms are facilitated by discretizing the region of interest onto a hexagonal tiling.

  2. 26 CFR 1.401(k)-5 - Special rules for mergers, acquisitions and similar events. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Special rules for mergers, acquisitions and similar events. [Reserved] 1.401(k)-5 Section 1.401(k)-5 Internal Revenue INTERNAL REVENUE SERVICE... Bonus Plans, Etc. § 1.401(k)-5 Special rules for mergers, acquisitions and similar events. [Reserved] [T...

  3. 26 CFR 1.401(k)-5 - Special rules for mergers, acquisitions and similar events. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 26 Internal Revenue 5 2013-04-01 2013-04-01 false Special rules for mergers, acquisitions and similar events. [Reserved] 1.401(k)-5 Section 1.401(k)-5 Internal Revenue INTERNAL REVENUE SERVICE...-Sharing, Stock Bonus Plans, Etc. § 1.401(k)-5 Special rules for mergers, acquisitions and similar events...

  4. 26 CFR 1.401(k)-5 - Special rules for mergers, acquisitions and similar events. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 26 Internal Revenue 5 2012-04-01 2011-04-01 true Special rules for mergers, acquisitions and similar events. [Reserved] 1.401(k)-5 Section 1.401(k)-5 Internal Revenue INTERNAL REVENUE SERVICE...-Sharing, Stock Bonus Plans, Etc. § 1.401(k)-5 Special rules for mergers, acquisitions and similar events...

  5. 26 CFR 1.401(k)-5 - Special rules for mergers, acquisitions and similar events. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 5 2011-04-01 2011-04-01 false Special rules for mergers, acquisitions and similar events. [Reserved] 1.401(k)-5 Section 1.401(k)-5 Internal Revenue INTERNAL REVENUE SERVICE...-Sharing, Stock Bonus Plans, Etc. § 1.401(k)-5 Special rules for mergers, acquisitions and similar events...

  6. 26 CFR 1.401(k)-5 - Special rules for mergers, acquisitions and similar events. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 5 2014-04-01 2014-04-01 false Special rules for mergers, acquisitions and similar events. [Reserved] 1.401(k)-5 Section 1.401(k)-5 Internal Revenue INTERNAL REVENUE SERVICE...-Sharing, Stock Bonus Plans, Etc. § 1.401(k)-5 Special rules for mergers, acquisitions and similar events...

  7. 26 CFR 1.401(m)-4 - Special rules for mergers, acquisitions and similar events. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 5 2011-04-01 2011-04-01 false Special rules for mergers, acquisitions and similar events. [Reserved] 1.401(m)-4 Section 1.401(m)-4 Internal Revenue INTERNAL REVENUE SERVICE...-Sharing, Stock Bonus Plans, Etc. § 1.401(m)-4 Special rules for mergers, acquisitions and similar events...

  8. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1993-01-01

    Reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other agencies through NASA.

  9. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Yuen, Joseph H. (Editor)

    1994-01-01

    Reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other agencies through NASA.

  10. An Architectural Framework for Describing Supervisory Control and Data Acquisition (SCADA) Systems

    DTIC Science & Technology

    2004-09-01

    having one of two possible values, described as 0 or 1. Boundary A logical segregation of related components in a system. The segregation may be based ...Depending on the sophistication of the microcontroller in the RTU, it can be configured to act as a relay station for other RTUs which cannot...communicate directly with a master station, or the microcontroller can communicate on a peer-to-peer basis with other RTUs. RTUs are generally remotely

  11. 15 CFR 921.21 - Initial acquisition and development awards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... implementing the NOAA approved draft management plan, hiring a Reserve manager and other staff as necessary and..., minor construction activities, consistent with paragraph (c) of this section also are allowed. The NOAA... acquisition and development award may be expended on such activities. NOAA must make a specific determination...

  12. 15 CFR 921.21 - Initial acquisition and development awards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... implementing the NOAA approved draft management plan, hiring a Reserve manager and other staff as necessary and..., minor construction activities, consistent with paragraph (c) of this section also are allowed. The NOAA... acquisition and development award may be expended on such activities. NOAA must make a specific determination...

  13. 15 CFR 921.21 - Initial acquisition and development awards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... implementing the NOAA approved draft management plan, hiring a Reserve manager and other staff as necessary and..., minor construction activities, consistent with paragraph (c) of this section also are allowed. The NOAA... acquisition and development award may be expended on such activities. NOAA must make a specific determination...

  14. 15 CFR 921.21 - Initial acquisition and development awards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... implementing the NOAA approved draft management plan, hiring a Reserve manager and other staff as necessary and..., minor construction activities, consistent with paragraph (c) of this section also are allowed. The NOAA... acquisition and development award may be expended on such activities. NOAA must make a specific determination...

  15. Simulation/Gaming and the Acquisition of Communicative Competence in Another Language.

    ERIC Educational Resources Information Center

    Garcia-Carbonell, Amparo; Rising, Beverly; Montero, Begona; Watts, Frances

    2001-01-01

    Discussion of communicative competence in second language acquisition focuses on a theoretical and practical meshing of simulation and gaming methodology with theories of foreign language acquisition, including task-based learning, interaction, and comprehensible input. Describes experiments conducted with computer-assisted simulations in…

  16. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  17. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 8 2013-10-01 2013-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  18. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  19. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 8 2012-10-01 2012-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  20. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  1. TRAMP; The next generation data acquisition for RTP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    van Haren, P.C.; Wijnoltz, F.

    1992-04-01

    The Rijnhuizen Tokamak Project RTP is a medium-sized tokamak experiment, which requires a very reliable data-acquisition system, due to its pulsed nature. Analyzing the limitations of an existing CAMAC-based data-acquisition system showed, that substantial increase of performance and flexibility could best be obtained by the construction of an entirely new system. This paper discusses this system, CALLED TRAMP (Transient Recorder and Amoeba Multi Processor), based on tailor-made transient recorders with a multiprocessor computer system in VME running Amoeba. The performance of TRAMP exceeds the performance of the CAMAC system by a factor of four. The plans to increase the flexibilitymore » and for a further increase of performance are presented.« less

  2. Evaluation of Acquisition Strategies for Image-Based Construction Site Monitoring

    NASA Astrophysics Data System (ADS)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2016-06-01

    Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the as-planned states (geometry, schedule, costs, ...) of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i) terrestrial acquisition with a hand-held camera, (ii) aerial acquisition using a Unmanned Aerial Vehicle (UAV) and (iii) acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane camera

  3. Acquisition of German Pluralization Rules in Monolingual and Multilingual Children

    ERIC Educational Resources Information Center

    Zaretsky, Eugen; Lange, Benjamin P.; Euler, Harald A.; Neumann, Katrin

    2013-01-01

    Existing studies on plural acquisition in German have relied on small samples and thus hardly deliver generalizable and differentiated results. Here, overgeneralizations of certain plural allomorphs and other tendencies in the acquisition of German plural markers are described on the basis of test data from 7,394 3- to 5-year-old monolingual…

  4. Music and early language acquisition.

    PubMed

    Brandt, Anthony; Gebrian, Molly; Slevc, L Robert

    2012-01-01

    Language is typically viewed as fundamental to human intelligence. Music, while recognized as a human universal, is often treated as an ancillary ability - one dependent on or derivative of language. In contrast, we argue that it is more productive from a developmental perspective to describe spoken language as a special type of music. A review of existing studies presents a compelling case that musical hearing and ability is essential to language acquisition. In addition, we challenge the prevailing view that music cognition matures more slowly than language and is more difficult; instead, we argue that music learning matches the speed and effort of language acquisition. We conclude that music merits a central place in our understanding of human development.

  5. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1993-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA.

  6. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    Developments in programs in telecommunication and data acquisition in space communications, radio navigation, radio science, and ground based radio astronomy are reported. Activities of the deep space network (DSN) and its associated ground communication facility (GCF) in planning, supporting research and technology, implementation, and in operations are outlined. The publication of reports on the application of radio interferometry at microwave frequencies for geodynamic measurements are presented. Implementation and operation for searching the microwave spectrum is reported.

  7. Simulation Based Acquisition for NASA's Office of Exploration Systems

    NASA Technical Reports Server (NTRS)

    Hale, Joe

    2004-01-01

    In January 2004, President George W. Bush unveiled his vision for NASA to advance U.S. scientific, security, and economic interests through a robust space exploration program. This vision includes the goal to extend human presence across the solar system, starting with a human return to the Moon no later than 2020, in preparation for human exploration of Mars and other destinations. In response to this vision, NASA has created the Office of Exploration Systems (OExS) to develop the innovative technologies, knowledge, and infrastructures to explore and support decisions about human exploration destinations, including the development of a new Crew Exploration Vehicle (CEV). Within the OExS organization, NASA is implementing Simulation Based Acquisition (SBA), a robust Modeling & Simulation (M&S) environment integrated across all acquisition phases and programs/teams, to make the realization of the President s vision more certain. Executed properly, SBA will foster better informed, timelier, and more defensible decisions throughout the acquisition life cycle. By doing so, SBA will improve the quality of NASA systems and speed their development, at less cost and risk than would otherwise be the case. SBA is a comprehensive, Enterprise-wide endeavor that necessitates an evolved culture, a revised spiral acquisition process, and an infrastructure of advanced Information Technology (IT) capabilities. SBA encompasses all project phases (from requirements analysis and concept formulation through design, manufacture, training, and operations), professional disciplines, and activities that can benefit from employing SBA capabilities. SBA capabilities include: developing and assessing system concepts and designs; planning manufacturing, assembly, transport, and launch; training crews, maintainers, launch personnel, and controllers; planning and monitoring missions; responding to emergencies by evaluating effects and exploring solutions; and communicating across the OEx

  8. Steps in the open space planning process

    Treesearch

    Stephanie B. Kelly; Melissa M. Ryan

    1995-01-01

    This paper presents the steps involved in developing an open space plan. The steps are generic in that the methods may be applied various size communities. The intent is to provide a framework to develop an open space plan that meets Massachusetts requirements for funding of open space acquisition.

  9. The Telecommunications and Data Acquisition

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1992-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).

  10. Acculturation, Communication Apprehension, and Language Acquisition.

    ERIC Educational Resources Information Center

    Mettler, Sally

    1987-01-01

    Describes acculturation as the negotiation of linguistic, behavioral, and affiliation barriers. Reviews three models of second-language acquisition and highlights problems for the learner related to linguistic noise, comprehension lag, and communication apprehension. Considers ways English-as-a-Second-Language instructors can ease linguistic and…

  11. Electro-Optic Data Acquisition and Processing.

    DTIC Science & Technology

    Methods for the analysis of electro - optic relaxation data are discussed. Emphasis is on numerical methods using high speed computers. A data acquisition system using a minicomputer for data manipulation is described. Relationship of the results obtained here to other possible uses is given. (Author)

  12. 48 CFR 1852.223-73 - Safety and Health Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Safety and Health Plan... 1852.223-73 Safety and Health Plan. As prescribed in 1823.7001(c), insert the following provision: Safety and Health Plan (NOV 2004) (a) The offeror shall submit a detailed safety and occupational health...

  13. 48 CFR 1852.223-73 - Safety and Health Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Safety and Health Plan... 1852.223-73 Safety and Health Plan. As prescribed in 1823.7001(c), insert the following provision: Safety and Health Plan (NOV 2004) (a) The offeror shall submit a detailed safety and occupational health...

  14. 48 CFR 1852.223-73 - Safety and Health Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Safety and Health Plan... 1852.223-73 Safety and Health Plan. As prescribed in 1823.7001(c), insert the following provision: Safety and Health Plan (NOV 2004) (a) The offeror shall submit a detailed safety and occupational health...

  15. 48 CFR 1852.223-73 - Safety and Health Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Safety and Health Plan... 1852.223-73 Safety and Health Plan. As prescribed in 1823.7001(c), insert the following provision: Safety and Health Plan (NOV 2004) (a) The offeror shall submit a detailed safety and occupational health...

  16. 48 CFR 1852.223-73 - Safety and Health Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Safety and Health Plan... 1852.223-73 Safety and Health Plan. As prescribed in 1823.7001(c), insert the following provision: Safety and Health Plan (NOV 2004) (a) The offeror shall submit a detailed safety and occupational health...

  17. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  18. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  19. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  20. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  1. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  2. Synchronisation, acquisition and tracking for telemetry and data reception

    NASA Astrophysics Data System (ADS)

    Vandoninck, A.

    1992-06-01

    The important parameters of synchronization, acquisition, and tracking are addressed, and each function is highlighted separately. The following sequence is such as the functions occur in the system in time and for the type of data to be received, with distinction between telemetry and data reception, between direct carrier modulation or the use of a subcarrier, and between deep space and normal reception. For the telemetry reception the acquisition is described taking into account the difference in performances as geostationary or polar orbits, and the dependencies on the different Doppler offsets and rates are distinguished. The related functions and parameters are covered and the specifications of an average receiver are summarized. The synchronization of the valid data is described with a distinction for data directly modulated or via a subcarrier, the type of modulation and bitrate. The relevant functions and parameters of the average receiver/demodulator are summarized. The tracking of the signal in the course of the operational phase is described and relevant parameters of an actual system are presented. The reception of real data is handled and a sequence of acquisition, synchronization, and tracking is applied. Here higher bitrates and direct modulation schemes play an important role. The market equipment with the relevant parameters are discussed. The three functions in cases where deep reception is needed are covered. The high performance receiver/demodulator functions and how the acquisition, synchronization, and tracking is handled in such application, are explained.

  3. One Size Does Not Fit All: How Acquisition Fails the Joint Force Commander

    DTIC Science & Technology

    2010-04-02

    Campaign Planning and Strategy . The contents of this paper reflect my own personal views and are not necessarily endorsed by the Joint Forces Staff...one-size-fits-all‖ approach has insidiously led to a flawed aircraft acquisition strategy that allows unacceptable risk to combat effectiveness in an...and 78% of the total US tactical aviation fleet. This ―one-size-fits-all‖ approach has insidiously led to a flawed aircraft acquisition strategy

  4. Technology Plan for the Terrestrial Planet Finder Interferometer

    NASA Technical Reports Server (NTRS)

    Lawson, Peter R. (Editor); Dooley, Jennifer A. (Editor)

    2005-01-01

    The technology plan for the Terrestrial Planet Finder Interferometer (TPF-I) describes the breadth of technology development currently envisaged to enable TPF-I to search for habitable worlds around nearby stars. TPF-I is currently in Pre-Phase A (the Advanced Study Phase) of its development. For planning purposes, it is expected to enter into Phase A in 2010 and be launched sometime before 2020. TPF-I is being developed concurrently with the Terrestrial Planet Finder Coronagraph (TPF-C), whose launch is anticipated in 201 6. The missions are being designed with the capability to detect Earth-like planets should they exist in the habitable zones of Sun-like (F,G, and K) stars out to a distance of about 60 light-years. Each mission will have the starlight-suppression and spectroscopic capability to enable the characterization of extrasolar planetary atmospheres, identifying biomarkers and signs of life. TPF-C is designed as a visible-light coronagraph; TPF-I is designed as a mid-infrared formation-flying interferometer. The two missions, working together, promise to yield unambiguous detections and characterizations of Earth-like planets. The challenges of planet detections with mid-infrared formation-flying interferometry are described within this technology plan. The approach to developing the technology is described through roadmaps that lead from our current state of the art through the different phases of mission development to launch. Technology metrics and milestones are given to measure progress. The emphasis of the plan is development and acquisition of technology during pre-Phase A to establish feasibility of the mission to enter Phase A sometime around 2010. Plans beyond 2010 are outlined. The plan contains descriptions of the development of new component technology as well as testbeds that demonstrate the viability of new techniques and technology required for the mission. Starlight-suppression (nulling) and formation-flying technology are highlighted

  5. Data acquisition software for DIRAC experiment

    NASA Astrophysics Data System (ADS)

    Olshevsky, V.; Trusov, S.

    2001-08-01

    The structure and basic processes of data acquisition software of the DIRAC experiment for the measurement of π +π - atom lifetime are described. The experiment is running on the PS accelerator of CERN. The developed software allows one to accept, record and distribute up to 3 Mbytes of data to consumers in one accelerator supercycle of 14.4 s duration. The described system is successfully in use in the experiment since its startup in 1998.

  6. Commonality in Military Equipment. A Framework to Improve Acquisition Decisions

    DTIC Science & Technology

    2008-01-01

    Improving Acquisition Decisions Chopra, Sunil , and Peter Meindl, Supply Chain Management : Strategy, Planning, Operation, Upper Saddle River, N.J...Personnel Costs in Managing Suppliers and Ordering Parts. The effort to perform these activities may be reduced and simplified through a smaller supply ...a Combined MOS on Mechanic Supply Variability

  7. Music and Early Language Acquisition

    PubMed Central

    Brandt, Anthony; Gebrian, Molly; Slevc, L. Robert

    2012-01-01

    Language is typically viewed as fundamental to human intelligence. Music, while recognized as a human universal, is often treated as an ancillary ability – one dependent on or derivative of language. In contrast, we argue that it is more productive from a developmental perspective to describe spoken language as a special type of music. A review of existing studies presents a compelling case that musical hearing and ability is essential to language acquisition. In addition, we challenge the prevailing view that music cognition matures more slowly than language and is more difficult; instead, we argue that music learning matches the speed and effort of language acquisition. We conclude that music merits a central place in our understanding of human development. PMID:22973254

  8. On the acquisition and representation of procedural knowledge

    NASA Technical Reports Server (NTRS)

    Saito, T.; Ortiz, C.; Loftin, R. B.

    1992-01-01

    Historically knowledge acquisition has proven to be one of the greatest barriers to the development of intelligent systems. Current practice generally requires lengthy interactions between the expert whose knowledge is to be captured and the knowledge engineer whose responsibility is to acquire and represent knowledge in a useful form. Although much research has been devoted to the development of methodologies and computer software to aid in the capture and representation of some of some types of knowledge, little attention has been devoted to procedural knowledge. NASA personnel frequently perform tasks that are primarily procedural in nature. Previous work is reviewed in the field of knowledge acquisition and then focus on knowledge acquisition for procedural tasks with special attention devoted to the Navy's VISTA tool. The design and development is described of a system for the acquisition and representation of procedural knowledge-TARGET (Task Analysis and Rule Generation Tool). TARGET is intended as a tool that permits experts to visually describe procedural tasks and as a common medium for knowledge refinement by the expert and knowledge engineer. The system is designed to represent the acquired knowledge in the form of production rules. Systems such as TARGET have the potential to profoundly reduce the time, difficulties, and costs of developing knowledge-based systems for the performance of procedural tasks.

  9. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment, safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and...

  10. A small Unix-based data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engberg, D.; Glanzman, T.

    1994-02-01

    The proposed SLAC B Factory detector plans to use Unix-based machines for all aspects of computing, including real-time data acquisition and experimental control. A R and D program has been established to investigate the use of Unix in the various aspects of experimental computation. Earlier R and D work investigated the basic real-time aspects of the IBM RS/6000 workstation running AIX, which claims to be a real-time operating system. The next step in this R and D is the construction of a prototype data acquisition system which attempts to exercise many of the features needed in the final on-line systemmore » in a realistic situation. For this project, the authors have combined efforts with a team studying the use of novel cell designs and gas mixtures in a new prototype drift chamber.« less

  11. Acquisition and tracking for underwater optical communications

    NASA Astrophysics Data System (ADS)

    Williams, Andrew J.; Laycock, Leslie L.; Griffith, Michael S.; McCarthy, Andrew G.; Rowe, Duncan P.

    2017-10-01

    There is a growing requirement to transfer large volumes of data between underwater platforms. As seawater is transmissive in the visible band, underwater optical communications is an active area of interest since it offers the potential for power efficient, covert and high bandwidth datalinks at short to medium ranges. Short range systems have been successfully demonstrated using sources with low directionality. To realise higher data rates and/or longer ranges, the use of more efficient directional beams is required; by necessity, these must be sufficiently aligned to achieve the required link margin. For mobile platforms, the acquisition and tracking of each node is therefore critical in order to establish and maintain an optical datalink. This paper describes work undertaken to demonstrate acquisition and tracking in a 3D underwater environment. A range of optical sources, beam steering technologies, and tracking sensors have been assessed for suitability. A novel scanning strategy exploiting variable beam divergence was developed to provide robust acquisition whilst minimising acquisition time. A prototype system was assembled and demonstrated in a large water tank. This utilised custom quadrant detectors based on Silicon PhotoMultiplier (SiPM) arrays for fine tracking, and a Wide Field of View (WFoV) sCMOS camera for link acquisition. Fluidic lenses provided dynamic control of beam divergence, and AC modulation/filtering enabled background rejection. The system successfully demonstrated robust optical acquisition and tracking between two nodes with only nanowatt received optical powers. The acquisition time was shown to be dependent on the initial conditions and the transmitted optical power.

  12. 48 CFR 1419.705-2 - Determining the need for a subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Determining the need for a subcontracting plan. 1419.705-2 Section 1419.705-2 Federal Acquisition Regulations System DEPARTMENT OF THE... recommendations offered. ...

  13. MRSA acquisition in an intensive care unit.

    PubMed

    Dancer, Stephanie J; Coyne, Michael; Speekenbrink, A; Samavedam, Sam; Kennedy, Julie; Wallace, Peter G M

    2006-02-01

    This paper describes a retrospective investigation of methicillin-resistant Staphylococcus aureus (MRSA) acquisition in an 8-bed intensive care unit (ICU) over a 5-month period. Clinical and microbiologic data were collected from the ICU, including MRSA detection dates, patient dependency scores, standardized environmental screening data, weekly bed occupancies, number of admissions, and nurse staffing levels. MRSA acquisition weeks were defined as weeks during which initial delivery of MRSA occurred before sampling and laboratory confirmation. Weekly workloads were plotted against staffing levels and modelled against MRSA acquisition weeks and hygiene failures. Of 174 patients admitted into the ICU, 28 (16%) were found to have MRSA; 12 of these (7%) acquired MRSA on the ICU within 7 of the 23 weeks studied. Six of these 7 weeks were associated with a deficit of trained nurses during the day and 5 with hygiene failures (data unavailable for 2). Pulsed-field gel electrophoresis (PFGE) profiles demonstrated relationships between staphylococci from staff hands, hand-touch sites, and patients' blood. MRSA acquisition in the ICU was temporally associated with reduced numbers of trained nurses and hygiene failures predominantly involving hand-touch sites. Epidemiologic analysis suggested that patient acquisitions were 7 times more likely to occur during periods of nurse understaffing.

  14. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1991-01-01

    This quarterly publication provides archival reports on developments in programs managed by the Jet Propulsion Laboratory's (JPL's) Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on the activities of the Deep Space Network (DSN) in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data, information systems, and reimbursable DSN work performed for other space agencies through NASA.

  15. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1990-01-01

    Archival reports on developments in programs managed by the Jet Propulsion Laboratory's (JPL) Office of Telecommunications and Data Acquisition (TDA) are given. Space communications, radio navigation, radio science, and ground-based radio and radar astronomy, activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, supporting research and technology, implementation, and operations are reported. Also included is TDA-funded activity at JPL on data and information systems and reimbursable Deep Space Network (DSN) work performed for other space agencies through NASA.

  16. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  17. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  18. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  19. The data acquisition system for the ANTARES neutrino telescope

    NASA Astrophysics Data System (ADS)

    Aguilar, J. A.; Albert, A.; Ameli, F.; Anghinolfi, M.; Anton, G.; Anvar, S.; Aslanides, E.; Aubert, J.-J.; Barbarito, E.; Basa, S.; Battaglieri, M.; Becherini, Y.; Bellotti, R.; Beltramelli, J.; Bertin, V.; Bigi, A.; Billault, M.; Blaes, R.; de Botton, N.; Bouwhuis, M. C.; Bradbury, S. M.; Bruijn, R.; Brunner, J.; Burgio, G. F.; Busto, J.; Cafagna, F.; Caillat, L.; Calzas, A.; Capone, A.; Caponetto, L.; Carmona, E.; Carr, J.; Cartwright, S. L.; Castel, D.; Castorina, E.; Cavasinni, V.; Cecchini, S.; Ceres, A.; Charvis, P.; Chauchot, P.; Chiarusi, T.; Circella, M.; Colnard, C.; Compère, C.; Coniglione, R.; Cottini, N.; Coyle, P.; Cuneo, S.; Cussatlegras, A.-S.; Damy, G.; van Dantzig, R.; de Marzo, C.; Dekeyser, I.; Delagnes, E.; Denans, D.; Deschamps, A.; Dessages-Ardellier, F.; Destelle, J.-J.; Dinkespieler, B.; Distefano, C.; Donzaud, C.; Drogou, J.-F.; Druillole, F.; Durand, D.; Ernenwein, J.-P.; Escoffier, S.; Falchini, E.; Favard, S.; Feinstein, F.; Ferry, S.; Festy, D.; Fiorello, C.; Flaminio, V.; Galeotti, S.; Gallone, J.-M.; Giacomelli, G.; Girard, N.; Gojak, C.; Goret, Ph.; Graf, K.; Hallewell, G.; Harakeh, M. N.; Hartmann, B.; Heijboer, A.; Heine, E.; Hello, Y.; Hernández-Rey, J. J.; Hößl, J.; Hoffman, C.; Hogenbirk, J.; Hubbard, J. R.; Jaquet, M.; Jaspers, M.; de Jong, M.; Jouvenot, F.; Kalantar-Nayestanaki, N.; Kappes, A.; Karg, T.; Karkar, S.; Katz, U.; Keller, P.; Kok, H.; Kooijman, P.; Kopper, C.; Korolkova, E. V.; Kouchner, A.; Kretschmer, W.; Kruijer, A.; Kuch, S.; Kudryavstev, V. A.; Lachartre, D.; Lafoux, H.; Lagier, P.; Lahmann, R.; Lamanna, G.; Lamare, P.; Languillat, J. C.; Laschinsky, H.; Le Guen, Y.; Le Provost, H.; Le van Suu, A.; Legou, T.; Lim, G.; Lo Nigro, L.; Lo Presti, D.; Loehner, H.; Loucatos, S.; Louis, F.; Lucarelli, F.; Lyashuk, V.; Marcelin, M.; Margiotta, A.; Masullo, R.; Mazéas, F.; Mazure, A.; McMillan, J. E.; Megna, R.; Melissas, M.; Migneco, E.; Milovanovic, A.; Mongelli, M.; Montaruli, T.; Morganti, M.; Moscoso, L.; Musumeci, M.; Naumann, C.; Naumann-Godo, M.; Niess, V.; Olivetto, C.; Ostasch, R.; Palanque-Delabrouille, N.; Payre, P.; Peek, H.; Petta, C.; Piattelli, P.; Pineau, J.-P.; Poinsignon, J.; Popa, V.; Pradier, T.; Racca, C.; Randazzo, N.; van Randwijk, J.; Real, D.; van Rens, B.; Réthoré, F.; Rewiersma, P.; Riccobene, G.; Rigaud, V.; Ripani, M.; Roca, V.; Roda, C.; Rolin, J. F.; Romita, M.; Rose, H. J.; Rostovtsev, A.; Roux, J.; Ruppi, M.; Russo, G. V.; Salesa, F.; Salomon, K.; Sapienza, P.; Schmitt, F.; Schuller, J.-P.; Shanidze, R.; Sokalski, I.; Spona, T.; Spurio, M.; van der Steenhoven, G.; Stolarczyk, T.; Streeb, K.; Stubert, D.; Sulak, L.; Taiuti, M.; Tamburini, C.; Tao, C.; Terreni, G.; Thompson, L. F.; Valdy, P.; Valente, V.; Vallage, B.; Venekamp, G.; Verlaat, B.; Vernin, P.; de Vita, R.; de Vries, G.; van Wijk, R.; de Witt Huberts, P.; Wobbe, G.; de Wolf, E.; Yao, A.-F.; Zaborov, D.; Zaccone, H.; Zornoza, J. D.; Zúñiga, J.

    2007-01-01

    The ANTARES neutrino telescope is being constructed in the Mediterranean Sea. It consists of a large three-dimensional array of photo-multiplier tubes. The data acquisition system of the detector takes care of the digitisation of the photo-multiplier tube signals, data transport, data filtering, and data storage. The detector is operated using a control program interfaced with all elements. The design and the implementation of the data acquisition system are described.

  20. Linking Acquisition Decisionmaking With National Military Strategy

    DTIC Science & Technology

    1990-10-01

    DTIC CONTAINED A SIGNIFICANT NUMBER OF COLOR PAGES WHICH DO NOT REPRODUCE LEGIBLY ON BLACK AND WHITE MICROFICHE, L i REPORT DOCUMENTATION PAGE Form...objectives I within the planning process. A fourth issue was the pace of change in enchancing the joint role in the acquisition g process. The former CJCS...goals, the roadmap, and PPOs. Hence, the DPG provides a VI-22 5 I systematic institutional memory , incorporating decisions as they are made, and thus

  1. Teaching Treatment Planning.

    ERIC Educational Resources Information Center

    Seligman, Linda

    1993-01-01

    Describes approach to teaching treatment planning that author has used successfully in both seminars and graduate courses. Clarifies nature and importance of systematic treatment planning, then describes context in which treatment planning seems more effectively taught, and concludes with step-by-step plan for teaching treatment planning.…

  2. Library Bulletin, International Planned Parenthood Federation, November 1976.

    ERIC Educational Resources Information Center

    International Planned Parenthood Federation, London (England).

    The current issue of the International Planned Parenthood Federation (IPPF) Library Bulletin combines an acquisitions list with that of special bibliographies. The broad classes follow the IPPF general organization by topics: (1) general reference, (2) IPPF, (3) family planning and maternal and child health and care, (4) bio-medical study and…

  3. Modeling human target acquisition in ground-to-air weapon systems

    NASA Technical Reports Server (NTRS)

    Phatak, A. V.; Mohr, R. L.; Vikmanis, M.; Wei, K. C.

    1982-01-01

    The problems associated with formulating and validating mathematical models for describing and predicting human target acquisition response are considered. In particular, the extension of the human observer model to include the acquisition phase as well as the tracking segment is presented. Relationship of the Observer model structure to the more complex Standard Optimal Control model formulation and to the simpler Transfer Function/Noise representation is discussed. Problems pertinent to structural identifiability and the form of the parameterization are elucidated. A systematic approach toward the identification of the observer acquisition model parameters from ensemble tracking error data is presented.

  4. Designed a web crawler which oriented network public opinion data acquisition

    NASA Astrophysics Data System (ADS)

    Lu, Shan; Ma, Hui; Gao, Ying

    2015-12-01

    The paper describes the meaning of network public opinion and the network public opinion research of data acquisition technique. Designed and implemented a web crawler which oriented network public opinion data acquisition. Insufficient analysis of the generic web crawler, using asynchronous Socket, DNS cache, and queue downloads to improve its bottom story frame, increase the speed of collecting.

  5. Data Management Standards in Computer-aided Acquisition and Logistic Support (CALS)

    NASA Technical Reports Server (NTRS)

    Jefferson, David K.

    1990-01-01

    Viewgraphs and discussion on data management standards in computer-aided acquisition and logistic support (CALS) are presented. CALS is intended to reduce cost, increase quality, and improve timeliness of weapon system acquisition and support by greatly improving the flow of technical information. The phase 2 standards, industrial environment, are discussed. The information resource dictionary system (IRDS) is described.

  6. The Reading Venture: Accelerating Language Acquisition.

    ERIC Educational Resources Information Center

    Sifontes, Aida I.; Baez, Dodie

    This presentation describes how to use reading to improve second language acquisition. Part 1, "Building Awareness of Reading Habits and Attitudes," has students report their habits and attitudes about reading in English and their native language and recognize the importance of reading for improving English skills. Part 2, "Choosing a Book," has…

  7. Corrosion Prevention and Control Planning Guidebook Spiral 3

    DTIC Science & Technology

    2007-09-01

    programs. 5. Develop and recommend corrective and preventive procedures based on reliability and maintainability analyses of field data on similar in...One of the many challenges facing the Program/Acquisition Managers is the ability to develop a meaningful Corrosion Prevention and Control Plan...designated program manager of all activities associated with the acquisition, development , production, fielding , sustainment, and disposal of a DoD weapon

  8. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1987-01-01

    Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. Activities of the Deep Space Network (DSN) in space communications, radio navigation, radio science, and ground-based radio astronomy are reported. Also included are the plans, supporting research and technology, implementation and operations for the Ground Communications Facility (GCF). In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. In the search for extraterrestrial intelligence (SETI), it reports on implementation and operations for searching the microwave spectrum.

  9. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1991-01-01

    A compilation is presented of articles on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition. In space communications, radio navigation, radio science, and ground based radio and radar astronomy, activities of the Deep Space Network are reported in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. In the search for extraterrestrial intelligence (SETI), implementation and operations are reported for searching the microwave spectrum.

  10. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    This publication reports on developments in programs managed by JPL's office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground based radio astronomy, it reports on activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, in supporting research and technology, in implementation and in operations. In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. This publication also reports on implementation and operations for searching the microwave spectrum.

  11. ALOS-2 current status and operation plan

    NASA Astrophysics Data System (ADS)

    Suzuki, Shinichi; Kankaku, Yukihiro; Osawa, Yuji

    2013-10-01

    The Advanced Land Observing Satellite-2 (ALOS-2) carries the state-of-the-art L-band Synthetic Aperture Radar (SAR) called PALSAR-2 which succeeds to the ALOS / PALSAR. PALSAR-2 will have enhanced performance in both high resolution and wide swath compared to PALSAR. It will allow comprehensive monitoring of disasters. Wider bandwidth and shorter revisit time will give better conference for INSAR data analysis such as crustal deformation and deforestation. The Proto Flight Test (PFT) of ALOS-2 has been conducted since June 2012. In parallel, the PFT of PALSAR-2 has been conducted since March 2012. As of August 2013, ALOS-2 system has completed the interface test with ground system and is preparing for the Vibration test, Acoustic test and Electromagnetic Compatibility test. After completing these tests, ALOS-2 will be transported to JAXA Tanegashima Space Center for launch. The initial commissioning phase of ALOS-2 is planned for six months which are comprised of LEOP (Launch and Early Orbit Phase) and initial Cal/Val phase. During the LEOP, all components will be checked with direct downlink via Xband and with data relay communication via JAXA's DRTS (Data Relay Test Satellite). During the initial Cal/Val phase, the PALSAR-2 data will be verified and calibrated by using Corner Reflectors and Geometric Calibrator at ground. The data acquisition during the commissioning phase will be consistent with the systematic acquisition strategy prepared for the routine operation. This paper describes the current status and operation plan of ALOS-2.

  12. Full information acquisition in scanning probe microscopy and spectroscopy

    DOEpatents

    Jesse, Stephen; Belianinov, Alex; Kalinin, Sergei V.; Somnath, Suhas

    2017-04-04

    Apparatus and methods are described for scanning probe microscopy and spectroscopy based on acquisition of full probe response. The full probe response contains valuable information about the probe-sample interaction that is lost in traditional scanning probe microscopy and spectroscopy methods. The full probe response is analyzed post data acquisition using fast Fourier transform and adaptive filtering, as well as multivariate analysis. The full response data is further compressed to retain only statistically significant components before being permanently stored.

  13. Field data acquisition technologies for Iowa transportation agencies.

    DOT National Transportation Integrated Search

    1994-08-01

    This report describes the results of the research project investigating the use of : advanced field data acquisition technologies for lowa transponation agencies. The : objectives of the research project were to (1) research and evaluate current data...

  14. COMPUTER-AIDED DATA ACQUISITION FOR COMBUSTION EXPERIMENTS

    EPA Science Inventory

    The article describes the use of computer-aided data acquisition techniques to aid the research program of the Combustion Research Branch (CRB) of the U.S. EPA's Air and Energy Engineering Research Laboratory (AEERL) in Research Triangle Park, NC, in particular on CRB's bench-sca...

  15. Library Bulletin, International Planned Parenthood Federation. February 1977.

    ERIC Educational Resources Information Center

    International Planned Parenthood Federation, London (England).

    This issue of the International Planned Parenthood Federation (IPPF) Library Bulletin combines an acquisitions list with that of special bibliographies. The broad classes follow the IPPF general organization by topics: (1) general reference, (2) IPPF, (3) family planning and maternal and child health and care, (4) bio-medical study and research on…

  16. 24 CFR 91.215 - Strategic plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... organizations, community and faith-based organizations, and public institutions, through which the jurisdiction... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Local Governments; Contents of... units, rehabilitation of existing units, or acquisition of existing units (including preserving...

  17. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  18. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  19. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  20. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  1. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  2. 76 FR 44280 - Defense Federal Acquisition Regulation Supplement; Simplified Acquisition Threshold for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ...-AH29 Defense Federal Acquisition Regulation Supplement; Simplified Acquisition Threshold for.... 2302(7) to invoke a simplified acquisition threshold that is two times the amount specified at 41 U.S.C... acquisition threshold is $150,000 as specified in Federal Acquisition Regulation 2.101. DATES: Effective Date...

  3. Language Acquisition without an Acquisition Device

    ERIC Educational Resources Information Center

    O'Grady, William

    2012-01-01

    Most explanatory work on first and second language learning assumes the primacy of the acquisition phenomenon itself, and a good deal of work has been devoted to the search for an "acquisition device" that is specific to humans, and perhaps even to language. I will consider the possibility that this strategy is misguided and that language…

  4. 75 FR 56078 - Federal Advisory Committee; Defense Acquisition University Board of Visitors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... p.m. DAU Strategic Planning Discussion Open Forum. Public's Accessibility to the Meeting Pursuant to... University Board of Visitors AGENCY: Office of the Assistant Secretary of Defense, Defense. ACTION: Meeting....150, the Department of Defense announces that the Defense Acquisition University Board of Visitors...

  5. 77 FR 183 - Federal Acquisition Regulation; Preventing Abuse of Interagency Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... ensure a level playing field in the acquisition planning process, the FAR should be amended to require a... the ability of the Government to leverage its purchasing power, e.g., will it have a negative effect... Act also provides authority for placement of orders between major organizational units within an...

  6. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Small business... Clauses 52.219-9 Small business subcontracting plan. As prescribed in 19.708(b), insert the following clause: Small Business Subcontracting Plan (OCT 2010) (a) This clause does not apply to small business...

  7. 23 CFR 710.501 - Early acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Early acquisition. 710.501 Section 710.501 Highways... State; (2) The property was not land described in 23 U.S.C. 138; (3) The property was acquired in... determinations required by 23 U.S.C. 108(c)(2)(C) and (D); and (2) The STD obtained concurrence from the...

  8. Supporting the Use of CERT (registered trademark) Secure Coding Standards in DoD Acquisitions

    DTIC Science & Technology

    2012-07-01

    Capability Maturity Model IntegrationSM (CMMI®) [Davis 2009]. SM Team Software Process, TSP, and Capability Maturity Model Integration are service...STP Software Test Plan TEP Test and Evaluation Plan TSP Team Software Process V & V verification and validation CMU/SEI-2012-TN-016 | 47...Supporting the Use of CERT® Secure Coding Standards in DoD Acquisitions Tim Morrow ( Software Engineering Institute) Robert Seacord ( Software

  9. Goldstone R/D High Speed Data Acquisition System

    NASA Technical Reports Server (NTRS)

    Deutsch, L. J.; Jurgens, R. F.; Brokl, S. S.

    1984-01-01

    A digital data acquisition system that meets the requirements of several users (initially the planetary radar program) is planned for general use at Deep Space Station 14 (DSS 14). The system, now partially complete, is controlled by VAX 11/780 computer that is programmed in high level languages. A DEC Data Controller is included for moderate-speed data acquisition, low speed data display, and for a digital interface to special user-provided devices. The high-speed data acquisition is performed in devices that are being designed and built at JPL. Analog IF signals are converted to a digitized 50 MHz real signal. This signal is filtered and mixed digitally to baseband after which its phase code (a PN sequence in the case of planetary radar) is removed. It may then be accumulated (or averaged) and fed into the VAX through an FPS 5210 array processor. Further data processing before entering the VAX is thus possible (computation and accumulation of the power spectra, for example). The system is to be located in the research and development pedestal at DSS 14 for easy access by researchers in radio astronomy as well as telemetry processing and antenna arraying.

  10. Workshop on data acquisition and trigger system simulations for high energy physics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-12-31

    This report discusses the following topics: DAQSIM: A data acquisition system simulation tool; Front end and DCC Simulations for the SDC Straw Tube System; Simulation of Non-Blocklng Data Acquisition Architectures; Simulation Studies of the SDC Data Collection Chip; Correlation Studies of the Data Collection Circuit & The Design of a Queue for this Circuit; Fast Data Compression & Transmission from a Silicon Strip Wafer; Simulation of SCI Protocols in Modsim; Visual Design with vVHDL; Stochastic Simulation of Asynchronous Buffers; SDC Trigger Simulations; Trigger Rates, DAQ & Online Processing at the SSC; Planned Enhancements to MODSEM II & SIMOBJECT -- anmore » Overview -- R.; DAGAR -- A synthesis system; Proposed Silicon Compiler for Physics Applications; Timed -- LOTOS in a PROLOG Environment: an Algebraic language for Simulation; Modeling and Simulation of an Event Builder for High Energy Physics Data Acquisition Systems; A Verilog Simulation for the CDF DAQ; Simulation to Design with Verilog; The DZero Data Acquisition System: Model and Measurements; DZero Trigger Level 1.5 Modeling; Strategies Optimizing Data Load in the DZero Triggers; Simulation of the DZero Level 2 Data Acquisition System; A Fast Method for Calculating DZero Level 1 Jet Trigger Properties and Physics Input to DAQ Studies.« less

  11. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A SIP...

  12. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  13. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  14. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  15. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  16. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  17. System Description for Tank 241-AZ-101 Waste Retrieval Data Acquisition System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMERO, S.G.

    2000-01-10

    Describes the hardware and software for the AZ-101 Mixer Pump Data Acquisition System. The purpose of the tank 241-AZ-101 retrieval system Data Acquisition System (DAS) is to provide monitoring and data acquisition of key parameters in order to confirm the effectiveness of the mixer pumps utilized for suspending solids in the tank. The suspension of solids in Tank 241-AZ-101 is necessary for pretreatment of the neutralized current acid waste (NCAW), and eventual disposal as glass via the Hanford Waste Vitrification Plant.

  18. A distributed data acquisition software scheme for the Laboratory Telerobotic Manipulator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butler, P.L.; Glassell, R.L.; Rowe, J.C.

    1990-01-01

    A custom software architecture was developed for use in the Laboratory Telerobotic Manipulator (LTM) to provide support for the distributed data acquisition electronics. This architecture was designed to provide a comprehensive development environment that proved to be useful for both hardware and software debugging. This paper describes the development environment and the operational characteristics of the real-time data acquisition software. 8 refs., 5 figs.

  19. Aligning Strategic and Information Systems Planning: A Review of Navy Efforts

    DTIC Science & Technology

    1990-03-01

    plans." [Ref. 11:p. 6] The results of the component level IR planning process are documented in Component Information Management Plans ( CIMP ). In mid...August, the CIMP’s are presented to the IR Planning Committee at the annual IR Planning Conference. Each CIMP is then distributed to all organizations...objectives promulgated in the CIMP or FASP will, if approved for development or acquisition, be further refined in project plans, which in turn, form the

  20. Acquisition of business intelligence from human experience in route planning

    NASA Astrophysics Data System (ADS)

    Bello Orgaz, Gema; Barrero, David F.; R-Moreno, María D.; Camacho, David

    2015-04-01

    The logistic sector raises a number of highly challenging problems. Probably one of the most important ones is the shipping planning, i.e. plan the routes that the shippers have to follow to deliver the goods. In this article, we present an artificial intelligence-based solution that has been designed to help a logistic company to improve its routes planning process. In order to achieve this goal, the solution uses the knowledge acquired by the company drivers to propose optimised routes. Hence, the proposed solution gathers the experience of the drivers, processes it and optimises the delivery process. The solution uses data mining to extract knowledge from the company information systems and prepares it for analysis with a case-based reasoning (CBR) algorithm. The CBR obtains critical business intelligence knowledge from the drivers experience that is needed by the planner. The design of the routes is done by a genetic algorithm that, given the processed information, optimises the routes following several objectives, such as minimise the distance or time. Experimentation shows that the proposed approach is able to find routes that improve, on average, the routes made by the human experts.

  1. An Analysis of Test And Evaluation in Rapid Acquisition Programs

    DTIC Science & Technology

    2015-12-01

    program manager is assigned the requirement and allocated resources to carry out with an acquisition plan. 2. Role of Test and Evaluation Test and...Manual, verify the Maintenance Allocation Chart, and ensure the completeness of the System Support Package. The Maintainability Demonstration measured...additional outside personnel that require additional logistics support, such as security, facilitates, and berthing placing additional strain on units. CLS

  2. Acquisition Handbook - Update. Comprehensive Approach to Reusable Defensive Software (CARDS)

    DTIC Science & Technology

    1994-03-25

    designs, and implementation components (source code, test plans, procedures and results, and system/software documentation). This handbook provides a...activities where software components are acquired, evaluated, tested and sometimes modified. In addition to serving as a facility for the acquisition and...systems from such components [1]. Implementation components are at the lowest level and consist of: specifications; detailed designs; code, test

  3. Seasonality of acquisition of respiratory bacterial pathogens in young children with cystic fibrosis.

    PubMed

    Psoter, Kevin J; De Roos, Anneclaire J; Wakefield, Jon; Mayer, Jonathan D; Rosenfeld, Margaret

    2017-06-09

    Seasonal variations are often observed for respiratory tract infections; however, limited information is available regarding seasonal patterns of acquisition of common cystic fibrosis (CF)-related respiratory pathogens. We previously reported differential seasonal acquisition of Pseudomonas aeruginosa in young children with CF and no such variation for methicillin-susceptible Staphylococcus aureus acquisition. The purpose of this study was to describe and compare the seasonal incidence of acquisition of other respiratory bacterial pathogens in young children with CF. We conducted a retrospective study to describe and compare the seasonal incidence of methicillin-resistant Staphylococcus aureus (MRSA), Stenotrophomonas maltophilia, Achromobacter xylosoxidans, and Haemophilus influenzae acquisition in young CF patients residing in the U.S. using the Cystic Fibrosis Foundation National Patient Registry, 2003-2009. Log-linear overdispersed Poisson regression was used to evaluate seasonal acquisition of each of these pathogens. A total of 4552 children met inclusion criteria. During follow-up 910 (20%), 1161 (26%), 228 (5%), and 2148 (47%) children acquired MRSA, S. maltophilia, A. xylosoxidans and H. influenzae, respectively. Compared to winter season, MRSA was less frequently acquired in spring (Incidence Rate Ratio [IRR]: 0.79; 95% Confidence Interval [CI]: 0.65, 0.96) and summer (IRR: 0.69; 95% CI: 0.57, 0.84) seasons. Similarly, a lower rate of A. xylosoxidans acquisition was observed in spring (IRR: 0.59; 95% CI: 0.39, 0.89). For H. influenzae, summer (IRR: 0.88; 95% CI: 0.78, 0.99) and autumn (IRR: 0.78; 95% CI: 0.69, 0.88) seasons were associated with lower acquisition rates compared to winter. No seasonal variation was observed for S. maltophilia acquisition. Acquisition of CF-related respiratory pathogens displays seasonal variation in young children with CF, with the highest rate of acquisition for most pathogens occurring in the winter. Investigation of

  4. 75 FR 51416 - Defense Federal Acquisition Regulation Supplement; Acquisition of Commercial Items

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... be used for the acquisition of commercial items, and revised the language to address the conditions... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 202, 212, and 234 [DFARS Case 2008-D011] Defense Federal Acquisition Regulation Supplement; Acquisition of Commercial Items...

  5. Expert Systems and Command, Control, and Communication System Acquisition

    DTIC Science & Technology

    1989-03-01

    Systems and Command, Control, and Communicaton System Acquisition 12 Personal Author(s) James E. Minnema 13a Type of Report 13b Time Covered 14 Date...isolated strategic planning, unstructured problems, the author feels that this category should also include problems involving the integration of...distinct operational or management control, and structured or semi-structured problem efforts. The reason for this is that integration of a number of

  6. Performance of the Defense Acquisition System, 2015 Annual report

    DTIC Science & Technology

    2015-09-16

    Planned Total (From Start to Completion) Quantity-Adjusted Unit -Procurement Recurring-Flyaway Funding (1999–2014) NOTE: This measures biennial...PAUC is a different funding measure define by statute (10 United States Code [U.S.C.], sections 2430a and 2432) consisting of the total acquisition... measures that (unlike PAUC and APUC) are fully adjusted for any changes in procurement quantity. These results help compare procurement unit costs

  7. Training Systems Product Group (TSPG) Training Systems Acquisition (TSA)

    DTIC Science & Technology

    2006-05-23

    ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release...Planned Actions • TSA III – Acquisition Strategy – Small Business • TSA II Points of Contact 3 Dominant Air Power: Design For Tomorrow…Deliver Today...Provides ready access to Large and Small Businesses Specializing in Air Force Training Systems Primarily Supporting Wright Patterson AFB OH and Hill AFB

  8. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Yuen, Joseph H. (Editor)

    1994-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Mission Operations Directorate (TMOD), which now includes the former Telecommunications and Data Acquisition (TDA) Office. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DS) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).

  9. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Yuen, Joseph H. (Editor)

    1993-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The papers included in this document cover satellite tracking and ground-based navigation, spacecraft-ground communications, and optical communication systems for the Deep Space Network.

  10. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Yuen, Joseph H. (Editor)

    1995-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Mission Operations Directorate (TMOD), which now includes the former Telecommunications and Data Acquisition (TDA) Office. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).

  11. 76 FR 71833 - Defense Federal Acquisition Regulation Supplement: Simplified Acquisition Threshold for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ...-AH29 Defense Federal Acquisition Regulation Supplement: Simplified Acquisition Threshold for... statutory authority to invoke a simplified acquisition threshold that is two times the normal amount to...) to invoke a simplified acquisition threshold that is two times the amount specified at 41 U.S.C 134...

  12. Language Acquisition and Machine Learning.

    DTIC Science & Technology

    1986-02-01

    machine learning and examine its implications for computational models of language acquisition. As a framework for understanding this research, the authors propose four component tasks involved in learning from experience-aggregation, clustering, characterization, and storage. They then consider four common problems studied by machine learning researchers-learning from examples, heuristics learning, conceptual clustering, and learning macro-operators-describing each in terms of our framework. After this, they turn to the problem of grammar

  13. A new scalable modular data acquisition system for SPECT (PET)

    NASA Astrophysics Data System (ADS)

    Stenstrom, P.; Rillbert, A.; Bergquist, M.; Habte, F.; Bohm, C.; Larsson, S. A.

    1998-06-01

    Describes a modular decentralized data acquisition system that continuously samples shaped PMT pulses from a SPECT detector. The pulse waveform data are used by signal processors to accurately reconstruct amplitude and time for each scintillation event. Data acquisition for a PMT channel is triggered in two alternative ways, either when its own signal exceeds a selected digital threshold, or when it receives a trigger pulse from one of its neighboring PMTs. The triggered region is restricted to seven, thirteen or nineteen neighboring PMT channels. Each acquisition module supports three PMT channels and connects to all other modules and a reconstruction computer via Firewire to cover the 72 channels in the Stockholm University/Karolinska Hospital cylindrical SPECT camera.

  14. 48 CFR 636.602-5 - Short selection processes for contracts not to exceed the simplified acquisition threshold.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for contracts not to exceed the simplified acquisition threshold. 636.602-5 Section 636.602-5 Federal... not to exceed the simplified acquisition threshold. The short selection process described in FAR 36.602-5 is authorized for use for contracts not expected to exceed the simplified acquisition threshold...

  15. Temporal planning for transportation planning and scheduling

    NASA Technical Reports Server (NTRS)

    Frederking, Robert E.; Muscettola, Nicola

    1992-01-01

    In this paper we describe preliminary work done in the CORTES project, applying the Heuristic Scheduling Testbed System (HSTS) to a transportation planning and scheduling domain. First, we describe in more detail the transportation problems that we are addressing. We then describe the fundamental characteristics of HSTS and we concentrate on the representation of multiple capacity resources. We continue with a more detailed description of the transportation planning problem that we have initially addressed in HSTS and of its solution. Finally we describe future directions for our research.

  16. 75 FR 71130 - Formations of, Acquisitions by, and Mergers of Bank Holding Companies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... FEDERAL RESERVE SYSTEM Formations of, Acquisitions by, and Mergers of Bank Holding Companies The... President) 1000 Peachtree Street, NE., Atlanta, Georgia 30309: 1. Independent Bancshares, Inc. Employee Stock Ownership Plan, Red Bay, Alabama; to acquire 27.17 percent of the voting shares of Independent...

  17. An Acquisition Guide for Executives

    EPA Pesticide Factsheets

    This guide covers the following subjects; What is Acquisition?, Purpose and Primary Functions of the Agency’s Acquisition System, Key Organizations in Acquisitions, Legal Framework, Key Players in Acquisitions, Acquisition Process, Acquisition Thresholds

  18. 48 CFR 1352.228-76 - Approval of group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Approval of group....228-76 Approval of group insurance plans. As prescribed in 48 CFR 1328.310-70(i), insert the following clause: Approval of Group Insurance Plans (APR 2010) Under cost-reimbursement contracts, before buying...

  19. 48 CFR 1352.228-76 - Approval of group insurance plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Approval of group....228-76 Approval of group insurance plans. As prescribed in 48 CFR 1328.310-70(i), insert the following clause: Approval of Group Insurance Plans (APR 2010) Under cost-reimbursement contracts, before buying...

  20. Collaborative environments for capability-based planning

    NASA Astrophysics Data System (ADS)

    McQuay, William K.

    2005-05-01

    Distributed collaboration is an emerging technology for the 21st century that will significantly change how business is conducted in the defense and commercial sectors. Collaboration involves two or more geographically dispersed entities working together to create a "product" by sharing and exchanging data, information, and knowledge. A product is defined broadly to include, for example, writing a report, creating software, designing hardware, or implementing robust systems engineering and capability planning processes in an organization. Collaborative environments provide the framework and integrate models, simulations, domain specific tools, and virtual test beds to facilitate collaboration between the multiple disciplines needed in the enterprise. The Air Force Research Laboratory (AFRL) is conducting a leading edge program in developing distributed collaborative technologies targeted to the Air Force's implementation of systems engineering for a simulation-aided acquisition and capability-based planning. The research is focusing on the open systems agent-based framework, product and process modeling, structural architecture, and the integration technologies - the glue to integrate the software components. In past four years, two live assessment events have been conducted to demonstrate the technology in support of research for the Air Force Agile Acquisition initiatives. The AFRL Collaborative Environment concept will foster a major cultural change in how the acquisition, training, and operational communities conduct business.

  1. 33. Perimeter acquisition radar building room #320, perimeter acquisition radar ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Perimeter acquisition radar building room #320, perimeter acquisition radar operations center (PAROC), contains the tactical command and control group equipment required to control the par site. Showing spacetrack monitor console - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  2. Design and development of an automatic data acquisition system for a balance study using a smartcard system.

    PubMed

    Ambrozy, C; Kolar, N A; Rattay, F

    2010-01-01

    For measurement value logging of board angle values during balance training, it is necessary to develop a measurement system. This study will provide data for a balance study using the smartcard. The data acquisition comes automatically. An individually training plan for each proband is necessary. To store the proband identification a smartcard with an I2C data bus protocol and an E2PROM memory system is used. For reading the smartcard data a smartcard reader is connected via universal serial bus (USB) to a notebook. The data acquisition and smartcard read programme is designed with Microsoft® Visual C#. A training plan file contains the individual training plan for each proband. The data of the test persons are saved in a proband directory. Each event is automatically saved as a log-file for the exact documentation. This system makes study development easy and time-saving.

  3. Image acquisition in the Pi-of-the-Sky project

    NASA Astrophysics Data System (ADS)

    Jegier, M.; Nawrocki, K.; Poźniak, K.; Sokołowski, M.

    2006-10-01

    Modern astronomical image acquisition systems dedicated for sky surveys provide large amount of data in a single measurement session. During one session that lasts a few hours it is possible to get as much as 100 GB of data. This large amount of data needs to be transferred from camera and processed. This paper presents some aspects of image acquisition in a sky survey image acquisition system. It describes a dedicated USB linux driver for the first version of the "Pi of The Sky" CCD camera (later versions have also Ethernet interface) and the test program for the camera together with a driver-wrapper providing core device functionality. Finally, the paper contains description of an algorithm for matching several images based on image features, i.e. star positions and their brightness.

  4. 77 FR 47668 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... DEPARTMENT OF LABOR Office of the Secretary Agency Information Collection Activities; Submission... Individual Account Plans Sponsored by Trust Real Estate Investment Trusts ACTION: Notice. SUMMARY: The... information collection request (ICR) titled, ``Acquisition and Sale of Trust Real Estate Investment Trust...

  5. Microcomputer-Based Acquisitions.

    ERIC Educational Resources Information Center

    Desmarais, Norman

    1986-01-01

    This discussion of three automated acquisitions systems--Bib-Base/Acq, The Book Trak Ordering System, and Card Datalog Acquisitions Module--covers searching and updating, editing, acquisitions functions and statistics, purchase orders and order file, budgeting and accounts maintenance, defining parameters, documentation, security, printing, and…

  6. Analytical Planning for University Libraries.

    ERIC Educational Resources Information Center

    Leimkuhler, Ferdinand F.; Cooper, Michael D.

    A survey is made of the more important technological and managerial problems in the planning of university library services and recommendations are made for a positive program of innovation and development. Two approaches are explored in considerable detail. The first is the use of operations research models of the acquisition and storage…

  7. 48 CFR 652.239-70 - Information Technology Security Plan and Accreditation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Information Technology... Clauses 652.239-70 Information Technology Security Plan and Accreditation. As prescribed in 639.107-70(a), insert the following provision: Information Technology Security Plan and Accreditation (SEP 2007) All...

  8. 48 CFR 1252.239-71 - Information technology security plan and accreditation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Information technology... Provisions and Clauses 1252.239-71 Information technology security plan and accreditation. As prescribed in (TAR) 48 CFR 1239.70, insert the following provision: Information Technology Security Plan and...

  9. 48 CFR 1252.239-71 - Information technology security plan and accreditation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Information technology... Provisions and Clauses 1252.239-71 Information technology security plan and accreditation. As prescribed in (TAR) 48 CFR 1239.70, insert the following provision: Information Technology Security Plan and...

  10. 48 CFR 652.239-70 - Information Technology Security Plan and Accreditation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Information Technology... Clauses 652.239-70 Information Technology Security Plan and Accreditation. As prescribed in 639.107-70(a), insert the following provision: Information Technology Security Plan and Accreditation (SEP 2007) All...

  11. 48 CFR 652.239-70 - Information Technology Security Plan and Accreditation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Information Technology... Clauses 652.239-70 Information Technology Security Plan and Accreditation. As prescribed in 639.107-70(a), insert the following provision: Information Technology Security Plan and Accreditation (SEP 2007) All...

  12. 48 CFR 652.239-70 - Information Technology Security Plan and Accreditation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Information Technology... Clauses 652.239-70 Information Technology Security Plan and Accreditation. As prescribed in 639.107-70(a), insert the following provision: Information Technology Security Plan and Accreditation (SEP 2007) All...

  13. 48 CFR 1252.239-71 - Information technology security plan and accreditation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Information technology... Provisions and Clauses 1252.239-71 Information technology security plan and accreditation. As prescribed in (TAR) 48 CFR 1239.70, insert the following provision: Information Technology Security Plan and...

  14. 48 CFR 1252.239-71 - Information technology security plan and accreditation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Information technology... Provisions and Clauses 1252.239-71 Information technology security plan and accreditation. As prescribed in (TAR) 48 CFR 1239.70, insert the following provision: Information Technology Security Plan and...

  15. 48 CFR 1252.239-71 - Information technology security plan and accreditation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Information technology... Provisions and Clauses 1252.239-71 Information technology security plan and accreditation. As prescribed in (TAR) 48 CFR 1239.70, insert the following provision: Information Technology Security Plan and...

  16. 48 CFR 652.239-70 - Information Technology Security Plan and Accreditation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Information Technology... Clauses 652.239-70 Information Technology Security Plan and Accreditation. As prescribed in 639.107-70(a), insert the following provision: Information Technology Security Plan and Accreditation (SEP 2007) All...

  17. 77 FR 10665 - General Services Administration Acquisition Regulation; Acquisition-Related Thresholds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... GENERAL SERVICES ADMINISTRATION 48 CFR Parts 519 and 552 [GSAR Amendment 2012-02; GSAR Case 2011-G502; (Change 54) Docket 2012- 0003, Sequence 1] RIN 3090-AJ24 General Services Administration Acquisition Regulation; Acquisition-Related Thresholds AGENCIES: Office of Acquisition Policy, General...

  18. 78 FR 36108 - Defense Federal Acquisition Regulation Supplement; Defense Trade Cooperation Treaties With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... and for foreign firms in their supply chains. The U.S. concluded the DTC Treaties with Australia and... respondent commended the Defense Acquisition Regulations (DAR) Council on recognizing the importance of the... established a Management Board to resolve such issues, adopted a detailed management plan, and conducted...

  19. Current Literature in Family Planning, November 1972, No. 51.

    ERIC Educational Resources Information Center

    Planned Parenthood--World Population, New York, NY. Katherine Dexter McCormick Library.

    Abstracts of current publications in the fields of population and family planning are contained in this monthly acquisitions list of the Katherine Dexter McCormick Library, Planned Parenthood, New York. Organized in two parts, Part 1 contains an annotated list of the books most recently acquired by the Library, marked with its Library call number,…

  20. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    NASA Technical Reports Server (NTRS)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  1. The need for speed: informed land acquisitions for conservation in a dynamic property market.

    PubMed

    McDonald-Madden, Eve; Bode, Michael; Game, Edward T; Grantham, Hedley; Possingham, Hugh P

    2008-11-01

    Land acquisition is a common approach to biodiversity conservation but is typically subject to property availability on the public market. Consequently, conservation plans are often unable to be implemented as intended. When properties come on the market, conservation agencies must make a choice: purchase immediately, often without a detailed knowledge of its biodiversity value; survey the parcel and accept the risk that it may be removed from the market during this process; or not purchase and hope a better parcel comes on the market at a later date. We describe both an optimal method, using stochastic dynamic programming, and a simple rule of thumb for making such decisions. The solutions to this problem illustrate how optimal conservation is necessarily dynamic and requires explicit consideration of both the time period allowed for implementation and the availability of properties.

  2. Investigating Second Language Acquisition.

    ERIC Educational Resources Information Center

    Jordens, Peter, Ed.; Lalleman, Josine, Ed.

    Essays in second language acquisition include: "The State of the Art in Second Language Acquisition Research" (Josine Lalleman); "Crosslinguistic Influence with Special Reference to the Acquisition of Grammar" (Michael Sharwood Smith); "Second Language Acquisition by Adult Immigrants: A Multiple Case Study of Turkish and…

  3. Land Acquisition Practices of the Miami-Dade County School District. Special Review.

    ERIC Educational Resources Information Center

    Florida State Legislature, Tallahassee. Office of Program Policy Analysis and Government Accountability.

    This review, requested by the Florida Legislature, answers six questions about Miami-Dade County School District's land acquisition practices. The six questions are: (1) Does the district effectively identify its facility needs and plan for those needs? (2) Does the district acquire the land it needs? (3) Has the district adopted land acquisition…

  4. A Framework to Support S&T Planning for Royal Australian Navy Capability Acquisition

    DTIC Science & Technology

    2012-03-01

    for guiding policy and assisting with strategic planning innovation processes. At the commencement of a Foresight Planning exercise the...for many Australian Defence Force (ADF) capability projects . Specifically, the methodology could prove beneficial in the development of science and...27 6.4 Selecting Appropriate Foresight Planning Methods ....................................... 28 7. SCIENCE AND

  5. 75 FR 5241 - General Services Administration Acquisition Regulation; Rewrite of Part 512, Acquisition of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... Acquisition Regulation; Rewrite of Part 512, Acquisition of Commercial Items AGENCIES: Office of Acquisition... Administration (GSA) is amending the General Services Administration Acquisition Regulation (GSAR) to update the text addressing the acquisition of commercial items. This rule is a result of the GSAM Rewrite...

  6. Automated data acquisition technology development:Automated modeling and control development

    NASA Technical Reports Server (NTRS)

    Romine, Peter L.

    1995-01-01

    This report documents the completion of, and improvements made to, the software developed for automated data acquisition and automated modeling and control development on the Texas Micro rackmounted PC's. This research was initiated because a need was identified by the Metal Processing Branch of NASA Marshall Space Flight Center for a mobile data acquisition and data analysis system, customized for welding measurement and calibration. Several hardware configurations were evaluated and a PC based system was chosen. The Welding Measurement System (WMS), is a dedicated instrument strickly for use of data acquisition and data analysis. In addition to the data acquisition functions described in this thesis, WMS also supports many functions associated with process control. The hardware and software requirements for an automated acquisition system for welding process parameters, welding equipment checkout, and welding process modeling were determined in 1992. From these recommendations, NASA purchased the necessary hardware and software. The new welding acquisition system is designed to collect welding parameter data and perform analysis to determine the voltage versus current arc-length relationship for VPPA welding. Once the results of this analysis are obtained, they can then be used to develop a RAIL function to control welding startup and shutdown without torch crashing.

  7. A Microcomputer-Based Data Acquisition System for Use in Undergraduate Laboratories.

    ERIC Educational Resources Information Center

    Johnson, Ray L.

    1982-01-01

    A laboratory computer system based on the Commodore PET 2001 is described including three applications for the undergraduate analytical chemistry laboratory: (1) recording a UV-visible absorption spectrum; (2) recording and use of calibration curves; and (3) recording potentiometric data. Lists of data acquisition programs described are available…

  8. 77 FR 69720 - Federal Acquisition Regulation; Interagency Acquisitions: Compliance by Nondefense Agencies With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... 9000-AM36 Federal Acquisition Regulation; Interagency Acquisitions: Compliance by Nondefense Agencies...D, GSA, and NASA are issuing an interim rule amending the Federal Acquisition Regulation (FAR) to add new requirements specific to the acquisition of supplies and services by nondefense agencies on...

  9. Knowledge acquisition for a simple expert controller

    NASA Technical Reports Server (NTRS)

    Bieker, B.

    1987-01-01

    A method is presented for process control which has the properties of being incremental, cyclic and top-down. It is described on the basis of the development of an expert controller for a simple, but nonlinear control route. A quality comparison between expert controller and process operator shows the ability of the method for knowledge acquisition.

  10. Data acquisition and readout system for the LUX dark matter experiment

    DOE PAGES

    Akerib, D. S.; Bai, X.; Bedikian, S.; ...

    2011-11-28

    LUX is a two-phase (liquid/gas) xenon time projection chamber designed to detect nuclear recoils from interactions with dark matter particles. Signals from the LUX detector are processed by custom-built analog electronics which provide properly shaped signals for the trigger and data acquisition (DAQ) systems. The DAQ is comprised of commercial digitizers with firmware customized for the LUX experiment. Data acquisition systems in rare-event searches must accommodate high rate and large dynamic range during precision calibrations involving radioactive sources, while also delivering low threshold for maximum sensitivity. The LUX DAQ meets these challenges using real-time baseline sup- pression that allows formore » a maximum event acquisition rate in excess of 1.5 kHz with virtually no deadtime. This work describes the LUX DAQ and the novel acquisition techniques employed in the LUX experiment.« less

  11. Biomedical signal acquisition, processing and transmission using smartphone

    NASA Astrophysics Data System (ADS)

    Roncagliolo, Pablo; Arredondo, Luis; González, Agustín

    2007-11-01

    This article describes technical aspects involved in the programming of a system of acquisition, processing and transmission of biomedical signals by using mobile devices. This task is aligned with the permanent development of new technologies for the diagnosis and sickness treatment, based on the feasibility of measuring continuously different variables as electrocardiographic signals, blood pressure, oxygen concentration, pulse or simply temperature. The contribution of this technology is settled on its portability and low cost, which allows its massive use. Specifically this work analyzes the feasibility of acquisition and the processing of signals from a standard smartphone. Work results allow to state that nowadays these equipments have enough processing capacity to execute signals acquisition systems. These systems along with external servers make it possible to imagine a near future where the possibility of making continuous measures of biomedical variables will not be restricted only to hospitals but will also begin to be more frequently used in the daily life and at home.

  12. An intelligent data acquisition system for fluid mechanics research

    NASA Technical Reports Server (NTRS)

    Cantwell, E. R.; Zilliac, G.; Fukunishi, Y.

    1989-01-01

    This paper describes a novel data acquisition system for use with wind-tunnel probe-based measurements, which incorporates a degree of specific fluid dynamics knowledge into a simple expert system-like control program. The concept was developed with a rudimentary expert system coupled to a probe positioning mechanism operating in a small-scale research wind tunnel. The software consisted of two basic elements, a general-purpose data acquisition system and the rulebased control element to take and analyze data and supplying decisions as to where to measure, how many data points to take, and when to stop. The system was validated in an experiment involving a vortical flow field, showing that it was possible to increase the resolution of the experiment or, alternatively, reduce the total number of data points required, to achieve parity with the results of most conventional data acquisition approaches.

  13. The Human Connectome Project: A data acquisition perspective

    PubMed Central

    Van Essen, D.C.; Ugurbil, K.; Auerbach, E.; Barch, D.; Behrens, T.E.J.; Bucholz, R.; Chang, A.; Chen, L.; Corbetta, M.; Curtiss, S.W.; Della Penna, S.; Feinberg, D.; Glasser, M.F.; Harel, N.; Heath, A.C.; Larson-Prior, L.; Marcus, D.; Michalareas, G.; Moeller, S.; Oostenveld, R.; Petersen, S.E.; Prior, F.; Schlaggar, B.L.; Smith, S.M.; Snyder, A.Z.; Xu, J.; Yacoub, E.

    2012-01-01

    The Human Connectome Project (HCP) is an ambitious 5-year effort to characterize brain connectivity and function and their variability in healthy adults. This review summarizes the data acquisition plans being implemented by a consortium of HCP investigators who will study a population of 1200 subjects (twins and their non-twin siblings) using multiple imaging modalities along with extensive behavioral and genetic data. The imaging modalities will include diffusion imaging (dMRI), resting-state fMRI (R-fMRI), task-evoked fMRI (T-fMRI), T1- and T2-weighted MRI for structural and myelin mapping, plus combined magnetoencephalography and electroencephalography (MEG/EEG). Given the importance of obtaining the best possible data quality, we discuss the efforts underway during the first two years of the grant (Phase I) to refine and optimize many aspects of HCP data acquisition, including a new 7T scanner, a customized 3T scanner, and improved MR pulse sequences. PMID:22366334

  14. DOE/NASA wind turbine data acquisition. Part 1: Equipment

    NASA Technical Reports Server (NTRS)

    Strock, O. J.

    1980-01-01

    Large quantities of data were collected, stored, and analyzed in connection with research and development programs on wind turbines. The hardware configuration of the wind energy remote data acquisition system is described along with its use on the NASA/DOE Wind Energy Program.

  15. Confidence-Based Feature Acquisition

    NASA Technical Reports Server (NTRS)

    Wagstaff, Kiri L.; desJardins, Marie; MacGlashan, James

    2010-01-01

    Confidence-based Feature Acquisition (CFA) is a novel, supervised learning method for acquiring missing feature values when there is missing data at both training (learning) and test (deployment) time. To train a machine learning classifier, data is encoded with a series of input features describing each item. In some applications, the training data may have missing values for some of the features, which can be acquired at a given cost. A relevant JPL example is that of the Mars rover exploration in which the features are obtained from a variety of different instruments, with different power consumption and integration time costs. The challenge is to decide which features will lead to increased classification performance and are therefore worth acquiring (paying the cost). To solve this problem, CFA, which is made up of two algorithms (CFA-train and CFA-predict), has been designed to greedily minimize total acquisition cost (during training and testing) while aiming for a specific accuracy level (specified as a confidence threshold). With this method, it is assumed that there is a nonempty subset of features that are free; that is, every instance in the data set includes these features initially for zero cost. It is also assumed that the feature acquisition (FA) cost associated with each feature is known in advance, and that the FA cost for a given feature is the same for all instances. Finally, CFA requires that the base-level classifiers produce not only a classification, but also a confidence (or posterior probability).

  16. New data acquisition system for beam loss monitor used in J-PARC main ring

    NASA Astrophysics Data System (ADS)

    Satou, K.; Toyama, T.; Kamikubota, N.; Yoshida, S.; Matsushita, J.; Wakita, T.; Sugiyama, M.; Morino, T.

    2018-04-01

    A new data acquisition system has been developed continually as a part of the development of a new beam loss monitor (BLM) system for the J-PARC main ring. This development includes a newly designed front-end isolation amp that uses photo-couplers and a VME-based new analog-to-digital converter (ADC) system. Compared to the old amp, the new amp has a 10 times higher conversion impedance for the input current to the output voltage; this value is 1 M Ω. Moreover, the bandwidth was improved to from DC to 50 kHz, which is about two orders of magnitude greater than the previously used bandwidth. The theoretical estimations made in this study roughly agree with the frequency response obtained for the new system. The new ADC system uses an on-board field-programmable gate array chip for signal processing. By replacing the firmware of this chip, changes pertaining to future accelerator upgrade plans may be introduced into the new ADC system; in addition, the ADC system can be used in other applications. The sampling speed of the system is 1 MS/s, and it exhibits a 95 dBc spurious-free dynamic range and 16.5 effective number of bits. The obtained waveform and integrated charge data are compared with two reference levels in the ADC system. If the data exceeds the reference level, the system generates an alarm to dump the beams. By using the new data acquisition system, it was proved that the new BLM system shows a wide dynamic range of 160 dB. In this study, the details of the new data acquisition system are described.

  17. The data acquisition of OLGA II; An application of the PSI TANDEM system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jost, D.T.; Vermeulen, D.

    1992-04-01

    This paper describes the data acquisition of the on-line gas-chemistry apparatus (OLGA II). OLGA II is used to investigate the chemical behavior of volatile molecules of short lives isotopes. Special emphasis is given to the presentation of the PSI tandem data acquisition system used in these experiments. Time stamped event-by-event recording is used to follow radioactive decay chains.

  18. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  19. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  20. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  1. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  2. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  3. Community Education for Family Planning in the U.S.

    PubMed Central

    Carter, Marion W.; Tregear, Michelle L.; Moskosky, Susan B.

    2015-01-01

    Context Community education may involve activities that seek to raise awareness and promote behavior change, using mass media, social media, and other media or interpersonal methods in community settings. This systematic review evaluated the evidence of the effects of community education on select short- and medium-term family planning outcomes. Evidence acquisition Using an analytic approach drawn from the U.S. Preventive Services Task Force, multiple databases were searched for articles published from January 1985 through February 2011 describing studies of community education related to family planning in the U.S. Included articles were reviewed and assessed for potential bias using a standardized process in 2011. An updated, targeted review for the 2011–2014 period was conducted in early 2015. Evidence synthesis Seventeen papers were identified. Most (nine) related to mass media interventions; three involved targeted print media, two involved text messaging or e-mail, two described outcome workers conducting community education, and one involved community theater. Study designs, strength of evidence, and levels of possible bias varied widely. Twelve of 15 studies that addressed outcomes such as increased awareness found positive associations with those outcomes, with six also reporting null findings. Seven of eight studies that addressed use of services reported positive associations, with two also reporting null findings. The targeted, additional review identified two other studies. Conclusions Evidence related to community education for family planning purposes is limited and highly variable. As goals of community education are usually limited to shorter-term outcomes, the evidence suggests that a range of approaches may be effective. PMID:26190841

  4. Planning to Serve: Using Backwards Planning to Design Service-Learning Lesson Plans in the Preservice Curriculum

    ERIC Educational Resources Information Center

    Stiler, Gary

    2009-01-01

    The author describes how the Understanding by Design (backwards planning) lesson plan format was used by his preservice K-12 students to develop service-learning lesson plans. Preservice teachers in a multicultural education course were given an assignment to develop service-learning lesson plans using the Understanding by Design planning process.…

  5. L-C Measurement Acquisition Method for Aerospace Systems

    NASA Technical Reports Server (NTRS)

    Woodard, Stanley E.; Taylor, B. Douglas; Shams, Qamar A.; Fox, Robert L.

    2003-01-01

    This paper describes a measurement acquisition method for aerospace systems that eliminates the need for sensors to have physical connection to a power source (i.e., no lead wires) or to data acquisition equipment. Furthermore, the method does not require the sensors to be in proximity to any form of acquisition hardware. Multiple sensors can be interrogated using this method. The sensors consist of a capacitor, C(p), whose capacitance changes with changes to a physical property, p, electrically connected to an inductor, L. The method uses an antenna to broadcast electromagnetic energy that electrically excites one or more inductive-capacitive sensors via Faraday induction. This method facilitates measurements that were not previously possible because there was no practical means of providing power and data acquisition electrical connections to a sensor. Unlike traditional sensors, which measure only a single physical property, the manner in which the sensing element is interrogated simultaneously allows measurement of at least two unrelated physical properties (e.g., displacement rate and fluid level) by using each constituent of the L-C element. The key to using the method for aerospace applications is to increase the distance between the L-C elements and interrogating antenna; develop all key components to be non-obtrusive and to develop sensing elements that can easily be implemented. Techniques that have resulted in increased distance between antenna and sensor will be presented. Fluid-level measurements and pressure measurements using the acquisition method are demonstrated in the paper.

  6. 77 FR 56737 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-61; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... Administration National Aeronautics and Space Administration 48 CFR Chapter 1 Federal Acquisition Regulations... AND SPACE ADMINISTRATION 48 CFR Chapter 1 [Docket FAR 2012-0080, Sequence 6] Federal Acquisition Regulation; Federal Acquisition Circular 2005-61; Introduction AGENCY: Department of Defense (DoD), General...

  7. 76 FR 39231 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-53; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... National Aeronautics and Space Administration 48 CFR Chapter 1 Federal Acquisition Regulation; Final Rules... ADMINISTRATION 48 CFR Chapter 1 [Docket FAR 2011-0076, Sequence 5] Federal Acquisition Regulation; Federal Acquisition Circular 2005-53; Introduction AGENCIES: Department of Defense (DoD), General Services...

  8. Collection development using interlibrary loan borrowing and acquisitions statistics.

    PubMed Central

    Byrd, G D; Thomas, D A; Hughes, K E

    1982-01-01

    Libraries, especially those supporting the sciences, continually face the problem of selecting appropriate new books for their users. Traditional collection development techniques include the use of librarian or user subject specialists, user recommendations, and approval plans. These methods of selection, however, are most effective in large libraries and do not systemically correlate new book purchases with the actual demands of users served. This paper describes a statistical method for determining subject strengths and weaknesses in a library book collection in relation to user demand. Using interlibrary loan borrowing and book acquisition statistics gathered for one fiscal year from three health sciences libraries, the authors developed a way to graph the broad and narrow subject fields of strength and potential weakness in a book collection. This method has the advantages of simplicity, speed of implementation, and clarity. It can also be used over a period of time to verify the success or failure of a collection development program. Finally, the method has potential as a tool for use by two or more libraries seeking to improve cooperative collection development in a network or consortium. PMID:7059712

  9. Crossed hot-wire data acquisition and reduction system

    NASA Technical Reports Server (NTRS)

    Westphal, R. V.; Mehta, R. D.

    1984-01-01

    The report describes a system for rapid computerized calibration acquisition, and processing of data from a crossed hot-wire anemometer is described. Advantages of the system are its speed, minimal use of analog electronics, and improved accuracy of the resulting data. Two components of mean velocity and turbulence statistics up to third order are provided by the data reduction. Details of the hardware, calibration procedures, response equations, software, and sample results from measurements in a turbulent plane mixing layer are presented.

  10. 77 FR 2653 - Defense Federal Acquisition Regulation Supplement; Pilot Program for Acquisition of Military...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 212 and 252 RIN 0750-AH27 Defense Federal Acquisition Regulation Supplement; Pilot Program for Acquisition of Military-Purpose Nondevelopmental Items (DFARS Case 2011-D034) AGENCY: Defense Acquisition Regulations System...

  11. On Board Data Acquisition System with Intelligent Transducers for Unmanned Aerial Vehicles

    NASA Astrophysics Data System (ADS)

    Rochala, Zdzisław

    2012-02-01

    This report presents conclusions from research project no. ON50900363 conducted at the Mechatronics Department, Military University of Technology in the years 2007-2010. As the main object of the study involved the preparation of a concept and the implementation of an avionics data acquisition system intended for research during flight of unmanned aerial vehicles of the mini class, this article presents a design of an avionics system and describes equipment solutions of a distributed measurement system intended for data acquisition consisting of intelligent transducers. The data collected during a flight controlled by an operator confirmed proper operation of the individual components of the data acquisition system.

  12. Computer Based Data Acquisition in the Undergraduate Lab.

    ERIC Educational Resources Information Center

    Wepfer, William J.; Oehmke, Roger L. T.

    1987-01-01

    Describes a data acquisition system developed for an undergraduate engineering students' instructional laboratory at Georgia Tech. Special emphasis is placed on the design of an A/D Converter Board used to measure the viscosity and temperature of motor oil. The Simons' BASIC Program Listing for the Commodore 64 microcomputer is appended. (LRW)

  13. Literacy Acquisition through Literature (Literacy Issues in Focus).

    ERIC Educational Resources Information Center

    Langer, Judith A.

    1997-01-01

    Discusses a project and study that focused on literacy acquisition among middle school students from the Dominican Republic attending a school on Manhattan's lower East Side. Describes how a book writing project focusing on "stories from home" engaged students, taught them ways to discuss and ways to think, and fostered their literacy acquisition…

  14. 78 FR 60167 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-70; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ...)(3), contracting officers are encouraged to include the changes in these rules in major modifications.... William Clark, Acting Director, Office of Government-wide Acquisition Policy, Office of Acquisition Policy, Office of Government-wide Policy. Federal Acquisition Circular (FAC) 2005-70 is issued under the...

  15. 77 FR 11367 - Defense Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation of Comprehensive... Program for Negotiation of Comprehensive Small Business Subcontracting Plans. DATES: Effective Date... Fiscal Year 2012, (Pub. L. 112-81). Section 866 amends the DoD Test Program for Negotiation of...

  16. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  17. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  18. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  19. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  20. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  1. Language acquisition from a biolinguistic perspective.

    PubMed

    Crain, Stephen; Koring, Loes; Thornton, Rosalind

    2017-10-01

    This paper describes the biolinguistic approach to language acquisition. We contrast the biolinguistic approach with a usage-based approach. We argue that the biolinguistic approach is superior because it provides more accurate and more extensive generalizations about the properties of human languages, as well as a better account of how children acquire human languages. To distinguish between these accounts, we focus on how child and adult language differ both in sentence production and in sentence understanding. We argue that the observed differences resist explanation using the cognitive mechanisms that are invoked by the usage-based approach. In contrast, the biolinguistic approach explains the qualitative parametric differences between child and adult language. Explaining how child and adult language differ and demonstrating that children perceive unity despite apparent diversity are two of the hallmarks of the biolinguistic approach to language acquisition. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Fast imaging employing steady-state acquisition (FIESTA) MRI to investigate cerebrospinal fluid (CSF) within dural reflections of posterior fossa cranial nerves.

    PubMed

    Noble, David J; Scoffings, Daniel; Ajithkumar, Thankamma; Williams, Michael V; Jefferies, Sarah J

    2016-11-01

    There is no consensus approach to covering skull base meningeal reflections-and cerebrospinal fluid (CSF) therein-of the posterior fossa cranial nerves (CNs VII-XII) when planning radiotherapy (RT) for medulloblastoma and ependymoma. We sought to determine whether MRI and specifically fast imaging employing steady-state acquisition (FIESTA) sequences can answer this anatomical question and guide RT planning. 96 posterior fossa FIESTA sequences were reviewed. Following exclusions, measurements were made on the following scans for each foramen respectively (left, right); internal acoustic meatus (IAM) (86, 84), jugular foramen (JF) (83, 85) and hypoglossal canal (HC) (42, 45). A protocol describes measurement procedure. Two observers measured distances for five cases and agreement was assessed. One observer measured all the remaining cases. IAM and JF measurement interobserver variability was compared. Mean measurement difference between observers was -0.275 mm (standard deviation 0.557). IAM and JF measurements were normally distributed. Mean IAM distance was 12.2 mm [95% confidence interval (CI) 8.8-15.6]; JF was 7.3 mm (95% CI 4.0-10.6). The HC was difficult to visualize on many images and data followed a bimodal distribution. Dural reflections of posterior fossa CNs are well demonstrated by FIESTA MRI. Measuring CSF extension into these structures is feasible and robust; mean CSF extension into IAM and JF was measured. We plan further work to assess coverage of these structures with photon and proton RT plans. Advances in knowledge: We have described CSF extension beyond the internal table of the skull into the IAM, JF and HC. Oncologists planning RT for patients with medulloblastoma and ependymoma may use these data to guide contouring.

  3. Improvements to Strategic Planning and Implementation through Enhanced Correlation with Decision-Making Frameworks

    ERIC Educational Resources Information Center

    McCready, John W.

    2010-01-01

    The purpose of this study was to examine use of decision-making tools and feedback in strategic planning in order to develop a rigorous process that would promote the efficiency of strategic planning for acquisitions in the United States Coast Guard (USCG). Strategic planning is critical to agencies such as the USCG in order to be effective…

  4. An acquisition system for CMOS imagers with a genuine 10 Gbit/s bandwidth

    NASA Astrophysics Data System (ADS)

    Guérin, C.; Mahroug, J.; Tromeur, W.; Houles, J.; Calabria, P.; Barbier, R.

    2012-12-01

    This paper presents a high data throughput acquisition system for pixel detector readout such as CMOS imagers. This CMOS acquisition board offers a genuine 10 Gbit/s bandwidth to the workstation and can provide an on-line and continuous high frame rate imaging capability. On-line processing can be implemented either on the Data Acquisition Board or on the multi-cores workstation depending on the complexity of the algorithms. The different parts composing the acquisition board have been designed to be used first with a single-photon detector called LUSIPHER (800×800 pixels), developed in our laboratory for scientific applications ranging from nano-photonics to adaptive optics. The architecture of the acquisition board is presented and the performances achieved by the produced boards are described. The future developments (hardware and software) concerning the on-line implementation of algorithms dedicated to single-photon imaging are tackled.

  5. Is Children's Acquisition of the Passive a Staged Process? Evidence from Six- and Nine-Year-Olds' Production of Passives

    ERIC Educational Resources Information Center

    Messenger, Katherine; Branigan, Holly P.; McLean, Janet F.

    2012-01-01

    We report a syntactic priming experiment that examined whether children's acquisition of the passive is a staged process, with acquisition of constituent structure preceding acquisition of thematic role mappings. Six-year-olds and nine-year-olds described transitive actions after hearing active and passive prime descriptions involving the same or…

  6. The hybrid UNIX controller for real-time data acquisition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huesman, R.H.; Klein, G.J.; Fleming, T.K.

    1996-06-01

    The authors describe a hybrid data acquisition architecture integrating a conventional UNIX workstation with CAMAC-based real-time hardware. The system combines the high-level programming simplicity and user interface of a UNIX workstation with the low-level timing control available from conventional real-time hardware. They detail this architecture as it has been implemented for control of the Donner 600-Crystal Positron Tomograph (PET600). Low-level data acquisition is carried out in this system using eight LeCroy 3588 histogrammers, which together after derandomization, acquire events at rates up to 4 MHz, and two dedicated Motorola 6809 microprocessors, which arbitrate fine timing control during acquisition. A SUNmore » Microsystems UNIX workstation is used for high-level control, allowing an easily extensible user interface in an X-Windows environment, as well as real-time communications to the low-level acquisition units. Communication between the high- and low-level units is carried out via a Jorway 73A SCSI-CAMAC crate controller and a serial interface. For this application, the hybrid configuration segments low from high-level control for ease of maintenance and provided a low-cost upgrade from dated high-level control hardware.« less

  7. (Department of Defense Office of Inspector General (DoD OIG)) Fiscal Year 2017 Oversight Plan

    DTIC Science & Technology

    2016-12-01

    the DoD has made progress in acquisition program management, but the DoD continues to experience programmatic problems , such as cost overruns and...later than originally planned, which results in increased expenses in DoD’s acquisition programs. Part of the problem is that weapons manufacturers...manner. The DoD OIG has also identified significant problems with past performance reporting across the DoD. The Federal Acquisition Regulations

  8. 75 FR 39413 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-44; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... Acquisition Council and the Defense Acquisition Regulations Council in this Federal Acquisition Circular (FAC) 2005-44. A companion document, the Small Entity Compliance Guide (SECG), follows this FAC. The FAC.... Please cite FAC 2005-44 and the FAR case number. Interested parties may also visit our Web site at http...

  9. Assessing the shelf life of cost-efficient conservation plans for species at risk across gradients of agricultural land use.

    PubMed

    Robillard, Cassandra M; Kerr, Jeremy T

    2017-08-01

    High costs of land in agricultural regions warrant spatial prioritization approaches to conservation that explicitly consider land prices to produce protected-area networks that accomplish targets efficiently. However, land-use changes in such regions and delays between plan design and implementation may render optimized plans obsolete before implementation occurs. To measure the shelf life of cost-efficient conservation plans, we simulated a land-acquisition and restoration initiative aimed at conserving species at risk in Canada's farmlands. We accounted for observed changes in land-acquisition costs and in agricultural intensity based on censuses of agriculture taken from 1986 to 2011. For each year of data, we mapped costs and areas of conservation priority designated using Marxan. We compared plans to test for changes through time in the arrangement of high-priority sites and in the total cost of each plan. For acquisition costs, we measured the savings from accounting for prices during site selection. Land-acquisition costs and land-use intensity generally rose over time independent of inflation (24-78%), although rates of change were heterogeneous through space and decreased in some areas. Accounting for spatial variation in land price lowered the cost of conservation plans by 1.73-13.9%, decreased the range of costs by 19-82%, and created unique solutions from which to choose. Despite the rise in plan costs over time, the high conservation priority of particular areas remained consistent. Delaying conservation in these critical areas may compromise what optimized conservation plans can achieve. In the case of Canadian farmland, rapid conservation action is cost-effective, even with moderate levels of uncertainty in how to implement restoration goals. © 2016 Society for Conservation Biology.

  10. EUROPA2: Plan Database Services for Planning and Scheduling Applications

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Frank, Jeremy; Jonsson, Ari; McGann, Conor

    2004-01-01

    NASA missions require solving a wide variety of planning and scheduling problems with temporal constraints; simple resources such as robotic arms, communications antennae and cameras; complex replenishable resources such as memory, power and fuel; and complex constraints on geometry, heat and lighting angles. Planners and schedulers that solve these problems are used in ground tools as well as onboard systems. The diversity of planning problems and applications of planners and schedulers precludes a one-size fits all solution. However, many of the underlying technologies are common across planning domains and applications. We describe CAPR, a formalism for planning that is general enough to cover a wide variety of planning and scheduling domains of interest to NASA. We then describe EUROPA(sub 2), a software framework implementing CAPR. EUROPA(sub 2) provides efficient, customizable Plan Database Services that enable the integration of CAPR into a wide variety of applications. We describe the design of EUROPA(sub 2) from the perspective of both modeling, customization and application integration to different classes of NASA missions.

  11. Software Acquisition Process (SWAP) Model FY81

    DTIC Science & Technology

    1982-12-01

    experience. In addition, the manpower accounting techniques and the effects of resource limitation are described below. a. Contractor Personnel. Five job...developed are each oriented to a specific type of developmental activity. Between them, they account for all types of activities in the acquisition...manning levels and duration; Decision Box probability; and project staffing levels. They take into account the overall size of the project and the

  12. Littoral Combat Ship and Frigate: Slowing Planned Frigate Acquisition Would Enable Better Informed Decisions

    DTIC Science & Technology

    2016-12-08

    States Government Accountability Office United States Government Accountability Office Highlights of GAO-17-279T, a testimony before the...million in defects for each ship. Time will tell whether this amount is sufficient to account for discovered defects.6 Turning to cost and schedule...279T Year GAO recommendation DOD response 2010 • Update the LCS acquisition strategy to account for operational testing delays in the program

  13. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1990-01-01

    Archival reports are given on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA), including space communications, radio navigation, radio science, ground-based radio and radar astronomy, and the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, supporting research and technology, implementation, and operations. Also included is TDA-funded activity at JPL on data and information systems and reimbursable DSN work performed for other space agencies through NASA. In the search for extraterrestrial intelligence (SETI), implementation and operations for searching the microwave spectrum are reported. Use of the Goldstone Solar System Radar for scientific exploration of the planets, their rings and satellites, asteroids, and comets are discussed.

  14. The acquisition of conditioned responding.

    PubMed

    Harris, Justin A

    2011-04-01

    This report analyzes the acquisition of conditioned responses in rats trained in a magazine approach paradigm. Following the suggestion by Gallistel, Fairhurst, and Balsam (2004), Weibull functions were fitted to the trial-by-trial response rates of individual rats. These showed that the emergence of responding was often delayed, after which the response rate would increase relatively gradually across trials. The fit of the Weibull function to the behavioral data of each rat was equaled by that of a cumulative exponential function incorporating a response threshold. Thus, the growth in conditioning strength on each trial can be modeled by the derivative of the exponential--a difference term of the form used in many models of associative learning (e.g., Rescorla & Wagner, 1972). Further analyses, comparing the acquisition of responding with a continuously reinforced stimulus (CRf) and a partially reinforced stimulus (PRf), provided further evidence in support of the difference term. In conclusion, the results are consistent with conventional models that describe learning as the growth of associative strength, incremented on each trial by an error-correction process.

  15. Discrete return lidar in natural resources: Recommendations for project planning, data processing, and deliverables

    Treesearch

    Jeffrey S. Evans; Andrew T. Hudak; Russ Faux; Alistair M. S. Smith

    2009-01-01

    Recent years have seen the progression of light detection and ranging (lidar) from the realm of research to operational use in natural resource management. Numerous government agencies, private industries, and public/private stakeholder consortiums are planning or have recently acquired large-scale acquisitions, and a national U.S. lidar acquisition is likely before...

  16. War-gaming application for future space systems acquisition

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2016-05-01

    Recently the U.S. Department of Defense (DOD) released the Defense Innovation Initiative (DII) [1] to focus DOD on five key aspects; Aspect #1: Recruit talented and innovative people, Aspect #2: Reinvigorate war-gaming, Aspect #3: Initiate long-range research and development programs, Aspect #4: Make DOD practices more innovative, and Aspect #5: Advance technology and new operational concepts. Per DII instruction, this paper concentrates on Aspect #2 and Aspect #4 by reinvigorating the war-gaming effort with a focus on an innovative approach for developing the optimum Program and Technical Baselines (PTBs) and their corresponding optimum acquisition strategies for acquiring future space systems. The paper describes a unified approach for applying the war-gaming concept for future DOD acquisition of space systems. The proposed approach includes a Unified Game-based Acquisition Framework (UGAF) and an Advanced Game-Based Mathematical Framework (AGMF) using Bayesian war-gaming engines to optimize PTB solutions and select the corresponding optimum acquisition strategies for acquiring a space system. The framework defines the action space for all players with a complete description of the elements associated with the games, including Department of Defense Acquisition Authority (DAA), stakeholders, warfighters, and potential contractors, War-Gaming Engines (WGEs) played by DAA, WGEs played by Contractor (KTR), and the players' Payoff and Cost functions (PCFs). The AGMF presented here addresses both complete and incomplete information cases. The proposed framework provides a recipe for the DAA and USAF-Space and Missile Systems Center (SMC) to acquire future space systems optimally.

  17. Electric Motors Maintenance Planning From Its Operating Variables

    NASA Astrophysics Data System (ADS)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  18. A distributed data acquisition system for aeronautics test facilities

    NASA Technical Reports Server (NTRS)

    Fronek, Dennis L.; Setter, Robert N.; Blumenthal, Philip Z.; Smalley, Robert R.

    1987-01-01

    The NASA Lewis Research Center is in the process of installing a new data acquisition and display system. This new system will provide small and medium sized aeronautics test facilities with a state-of-the-art real-time data acquisition and display system. The new data system will provide for the acquisition of signals from a variety of instrumentation sources. They include analog measurements of temperatures, pressures, and other steady state voltage inputs; frequency inputs to measure speed and flow; discrete I/O for significant events, and modular instrument systems such as multiplexed pressure modules or electronic instrumentation with a IEEE 488 interface. The data system is designed to acquire data, convert it to engineering units, compute test dependent performance calculations, limit check selected channels or calculations, and display the information in alphanumeric or graphical form with a cycle time of one second for the alphanumeric data. This paper describes the system configuration, its salient features, and the expected impact on testing.

  19. Operational plans for life science payloads - From experiment selection through postflight reporting

    NASA Technical Reports Server (NTRS)

    Mccollum, G. W.; Nelson, W. G.; Wells, G. W.

    1976-01-01

    Key features of operational plans developed in a study of the Space Shuttle era life science payloads program are presented. The data describes the overall acquisition, staging, and integration of payload elements, as well as program implementation methods and mission support requirements. Five configurations were selected as representative payloads: (a) carry-on laboratories - medical emphasis experiments, (b) mini-laboratories - medical/biology experiments, (c) seven-day dedicated laboratories - medical/biology experiments, (d) 30-day dedicated laboratories - Regenerative Life Support Evaluation (RLSE) with selected life science experiments, and (e) Biomedical Experiments Scientific Satellite (BESS) - extended duration primate (Type I) and small vertebrate (Type II) missions. The recommended operational methods described in the paper are compared to the fundamental data which has been developed in the life science Spacelab Mission Simulation (SMS) test series. Areas assessed include crew training, experiment development and integration, testing, data-dissemination, organization interfaces, and principal investigator working relationships.

  20. Hormonal contraception and HIV acquisition risk: implications for individual users and public policies.

    PubMed

    Jain, Anrudh K

    2012-12-01

    A recent observational study among HIV-1 serodiscordant couples (uninfected women living with an infected partner) raised concerns about the safety of injectable contraceptives, especially depot medroxyprogesterone acetate (DMPA). The purpose of this paper is to assess the implications of potentially elevated risk of Human Immunodeficiency Virus (HIV) acquisition with the use of hormonal contraceptives for individual users and public policies. Two indicators expressing costs (additional unwanted births and additional maternal deaths) in terms of the same unit of benefit (per 100 HIV infections averted) are estimated by using data on competing risks of unwanted birth and HIV acquisition associated with the use of various contraceptive methods. Elevated HIV acquisition risks associated with hormonal contraception observed in the observational studies of family planning users, sex workers and HIV-1 serodiscordant couples are used. Other relevant data for Kenya, South Africa and Zimbabwe are used to illustrate the potential effect of withdrawal of DMPA at the population level. Both the risks of unwanted birth and HIV acquisition with sterilization, intrauterine devices (IUDs) and implants at the individual level are lower than those with DMPA. A shift from DMPA to an oral contraceptive (OC) or male condom by an individual could result in about 600 and a shift to no method in about 5400 additional unwanted births per 100 HIV infections averted. At the population level, the withdrawal of DMPA from Kenya, for example, could result in 7600 annual additional unwanted births and 40 annual additional maternal deaths per 100 HIV infections averted. Individual DMPA users may be advised to shift to sterilization, IUD or implant depending upon their reproductive needs and circumstances, but not to no method, OC or even condom alone. At the macro level, the decision to withdraw DMPA from family planning programs in sub-Saharan Africa is not warranted. Copyright © 2012 Elsevier

  1. Which psychoactive prescription drugs are illegally obtained and through which ways of acquisition? About OPPIDUM survey.

    PubMed

    Frauger, Elisabeth; Nordmann, Sandra; Orleans, Veronica; Pradel, Vincent; Pauly, Vanessa; Thirion, Xavier; Micallef, Joëlle

    2012-08-01

    The objective of the study was to determine which psychoactive prescription drugs are illegally obtained and through which ways of acquisition. OPPIDUM is an annual national study. It is based on specialized care centers that included subjects presenting a drug dependency or under opiate maintenance treatment. All their psychoactive substances consumed are reported. This work focuses on the different ways of acquisition specially the illegal ways of acquisition (bought on the street, forged prescription, stolen, given, internet). For each medication illegally obtained, a ratio has been calculated (number of illegal acquisitions divided by the number of described acquisitions). In 2008, 5542 subjects have been included and have described the consumption of 11 027 substances including 63.8% of prescription drugs. Among them, 11% were illegally obtained. The different illegal acquisition ways were 'street market' (77.6%), 'gift' (16.6%), 'theft' (2.3%), 'forged prescription' (2.3%), and 'internet' (0.7%). The third first drugs illegally obtained were high dosage buprenorphine, methadone, and clonazepam. Some prescription drugs, less consumed, have an important ratio of illegal acquisition like ketamine, flunitrazepam, morphine, trihexyphenidyl, or methylphenidate. This study confirms that theft, forged prescription and internet are few used and permits to highlight diversion of prescription drugs. It is important to inform healthcare professionals on the different prescription drugs that are illegally obtained. © 2011 The Authors Fundamental and Clinical Pharmacology © 2011 Société Française de Pharmacologie et de Thérapeutique.

  2. Office of the Assistant Secretary for Preparedness and Response; HHS Public Health Emergency Medical Countermeasures Enterprise implementation plan for chemical, biological, radiological and nuclear threats. Notice.

    PubMed

    2007-04-23

    The United States faces serious public health threats from the deliberate use of weapons of mass destruction (WMD)--chemical, biological, radiological, or nuclear (CBRN)--by hostile States or terrorists, and from naturally emerging infectious diseases that have a potential to cause illness on a scale that could adversely impact national security. Effective strategies to prevent, mitigate, and treat the consequences of CBRN threats is an integral component of our national security strategy. To that end, the United States must be able to rapidly develop, stockpile, and deploy effective medical countermeasures to protect the American people. The HHS Public Health Emergency Medical Countermeasures Enterprise (PHEMCE) has taken a holistic, end-to-end approach that considers multiple aspects of the medical countermeasures mission including research, development, acquisition, storage, maintenance, deployment, and guidance for utilization. Phase one of this approach established the HHS PHEMCE Strategy for Chemical, Biological, Radiological, and Nuclear Threats (HHS PHEMCE Strategy). The HHS PHEMCE Strategy, published in the Federal Register on March 20, 2007, described a framework of strategic policy goals and objectives for identifying medical countermeasure requirements and establishing priorities for medical countermeasure evaluation, development and acquisition. These strategic policy goals and objectives were used to establish the Four Pillars upon which this HHS Public Health Emergency Medical Countermeasures Enterprise Implementation Plan (HHS PHEMCE Implementation Plan) is based. The HHS PHEMCE Implementation Plan considers the full spectrum of medical countermeasures-related activities, including research, development, acquisition, storage/maintenance, deployment, and utilization. The HHS PHEMCE Implementation Plan is consistent with the President's Biodefense for the 21st Century and is aligned with the National Strategy for Medical Countermeasures against

  3. Parallel Spectral Acquisition with an Ion Cyclotron Resonance Cell Array.

    PubMed

    Park, Sung-Gun; Anderson, Gordon A; Navare, Arti T; Bruce, James E

    2016-01-19

    Mass measurement accuracy is a critical analytical figure-of-merit in most areas of mass spectrometry application. However, the time required for acquisition of high-resolution, high mass accuracy data limits many applications and is an aspect under continual pressure for development. Current efforts target implementation of higher electrostatic and magnetic fields because ion oscillatory frequencies increase linearly with field strength. As such, the time required for spectral acquisition of a given resolving power and mass accuracy decreases linearly with increasing fields. Mass spectrometer developments to include multiple high-resolution detectors that can be operated in parallel could further decrease the acquisition time by a factor of n, the number of detectors. Efforts described here resulted in development of an instrument with a set of Fourier transform ion cyclotron resonance (ICR) cells as detectors that constitute the first MS array capable of parallel high-resolution spectral acquisition. ICR cell array systems consisting of three or five cells were constructed with printed circuit boards and installed within a single superconducting magnet and vacuum system. Independent ion populations were injected and trapped within each cell in the array. Upon filling the array, all ions in all cells were simultaneously excited and ICR signals from each cell were independently amplified and recorded in parallel. Presented here are the initial results of successful parallel spectral acquisition, parallel mass spectrometry (MS) and MS/MS measurements, and parallel high-resolution acquisition with the MS array system.

  4. 75 FR 48872 - General Services Administration Acquisition Regulation; Rewrite of GSAR Part 541, Acquisition of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... Acquisition Regulation; Rewrite of GSAR Part 541, Acquisition of Utility Services AGENCIES: Office of Acquisition Policy, General Services Administration (GSA). ACTION: Final rule. SUMMARY: The General Services Administration (GSA) is amending the General Services Administration Acquisition Regulation (GSAR) to improve the...

  5. [Prosody, speech input and language acquisition].

    PubMed

    Jungheim, M; Miller, S; Kühn, D; Ptok, M

    2014-04-01

    In order to acquire language, children require speech input. The prosody of the speech input plays an important role. In most cultures adults modify their code when communicating with children. Compared to normal speech this code differs especially with regard to prosody. For this review a selective literature search in PubMed and Scopus was performed. Prosodic characteristics are a key feature of spoken language. By analysing prosodic features, children gain knowledge about underlying grammatical structures. Child-directed speech (CDS) is modified in a way that meaningful sequences are highlighted acoustically so that important information can be extracted from the continuous speech flow more easily. CDS is said to enhance the representation of linguistic signs. Taking into consideration what has previously been described in the literature regarding the perception of suprasegmentals, CDS seems to be able to support language acquisition due to the correspondence of prosodic and syntactic units. However, no findings have been reported, stating that the linguistically reduced CDS could hinder first language acquisition.

  6. Excessive Acquisition in Hoarding

    PubMed Central

    Frost, Randy O.; Tolin, David F.; Steketee, Gail; Fitch, Kristin E.; Selbo-Bruns, Alexandra

    2009-01-01

    Compulsive hoarding (the acquisition of and failure to discard large numbers of possessions) is associated with substantial health risk, impairment, and economic burden. However, little research has examined separate components of this definition, particularly excessive acquisition. The present study examined acquisition in hoarding. Participants, 878 self-identified with hoarding and 665 family informants (not matched to hoarding participants), completed an internet survey. Among hoarding participants who met criteria for clinically significant hoarding, 61% met criteria for a diagnosis of compulsive buying and approximately 85% reported excessive acquisition. Family informants indicated that nearly 95% exhibited excessive acquisition. Those who acquired excessively had more severe hoarding; their hoarding had an earlier onset and resulted in more psychiatric work impairment days; and they experienced more symptoms of obsessive-compulsive disorder, depression, and anxiety. Two forms of excessive acquisition (buying and free things) each contributed independent variance in the prediction of hoarding severity and related symptoms. PMID:19261435

  7. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  8. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  9. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  10. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  11. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  12. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  13. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  14. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  15. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  16. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  17. 48 CFR 211.106 - Purchase descriptions for service contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Purchase descriptions for service contracts. 211.106 Section 211.106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and...

  18. 48 CFR 11.702 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...

  19. 48 CFR 11.702 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...

  20. 48 CFR 11.702 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...

  1. 48 CFR 11.702 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 11.702 Section 11.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.702 Construction contracts. Construction...

  2. 48 CFR 211.106 - Purchase descriptions for service contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Purchase descriptions for service contracts. 211.106 Section 211.106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and...

  3. 48 CFR 211.106 - Purchase descriptions for service contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Purchase descriptions for service contracts. 211.106 Section 211.106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and...

  4. 48 CFR 211.106 - Purchase descriptions for service contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Purchase descriptions for service contracts. 211.106 Section 211.106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and...

  5. 48 CFR 211.106 - Purchase descriptions for service contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Purchase descriptions for service contracts. 211.106 Section 211.106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Selecting and...

  6. 48 CFR 11.203 - Customer satisfaction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Customer satisfaction. 11.203 Section 11.203 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Using and Maintaining Requirements Documents 11.203 Customer satisfaction...

  7. Constraint-based Attribute and Interval Planning

    NASA Technical Reports Server (NTRS)

    Jonsson, Ari; Frank, Jeremy

    2013-01-01

    In this paper we describe Constraint-based Attribute and Interval Planning (CAIP), a paradigm for representing and reasoning about plans. The paradigm enables the description of planning domains with time, resources, concurrent activities, mutual exclusions among sets of activities, disjunctive preconditions and conditional effects. We provide a theoretical foundation for the paradigm, based on temporal intervals and attributes. We then show how the plans are naturally expressed by networks of constraints, and show that the process of planning maps directly to dynamic constraint reasoning. In addition, we de ne compatibilities, a compact mechanism for describing planning domains. We describe how this framework can incorporate the use of constraint reasoning technology to improve planning. Finally, we describe EUROPA, an implementation of the CAIP framework.

  8. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  9. 77 FR 74689 - Land Acquisitions; Tonkawa Tribe of Oklahoma

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Land Acquisitions; Tonkawa Tribe of Oklahoma... of land in trust for the Tonkawa Tribe of Oklahoma on December 6, 2012. FOR FURTHER INFORMATION... Tribe of Oklahoma under the authority of the Indian Reorganization Act of 1934, 25 U.S.C. 465, described...

  10. 76 FR 39243 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-53; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... ADMINISTRATION 48 CFR Chapter 1 [Docket FAR 2011-0077, Sequence 5] Federal Acquisition Regulation; Federal Acquisition Circular 2005-53; Small Entity Compliance Guide AGENCY: Department of Defense (DoD), General... Federal Acquisition Circular (FAC) 2005-53, which amend the Federal Acquisition Regulation (FAR). An...

  11. Generalized serial search code acquisition - The equivalent circular state diagram approach

    NASA Technical Reports Server (NTRS)

    Polydoros, A.; Simon, M. K.

    1984-01-01

    A transform-domain method for deriving the generating function of the acquisition process resulting from an arbitrary serial search strategy is presented. The method relies on equivalent circular state diagrams, uses Mason's formula from flow-graph theory, and employs a minimum number of required parameters. The transform-domain approach is briefly described and the concept of equivalent circular state diagrams is introduced and exploited to derive the generating function and resulting mean acquisition time for three particular cases of interest, the continuous/center Z search, the broken/center Z search, and the expanding window search. An optimization of the latter technique is performed whereby the number of partial windows which minimizes the mean acquisition time is determined. The numerical results satisfy certain intuitive predictions and provide useful design guidelines for such systems.

  12. 48 CFR 304.7001 - Numbering acquisitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Numbering acquisitions. 304.7001 Section 304.7001 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATIVE MATTERS Acquisition Instrument Identification Numbering System 304.7001 Numbering acquisitions. (a...

  13. Analytical performance of the various acquisition modes in Orbitrap MS and MS/MS.

    PubMed

    Kaufmann, Anton

    2018-04-30

    Quadrupole Orbitrap instruments (Q Orbitrap) permit high-resolution mass spectrometry (HRMS)-based full scan acquisitions and have a number of acquisition modes where the quadrupole isolates a particular mass range prior to a possible fragmentation and HRMS-based acquisition. Selecting the proper acquisition mode(s) is essential if trace analytes are to be quantified in complex matrix extracts. Depending on the particular requirements, such as sensitivity, selectivity of detection, linear dynamic range, and speed of analysis, different acquisition modes may have to be chosen. This is particularly important in the field of multi-residue analysis (e.g., pesticides or veterinary drugs in food samples) where a large number of analytes within a complex matrix have to be detected and reliably quantified. Meeting the specific detection and quantification performance criteria for every targeted compound may be challenging. It is the aim of this paper to describe the strengths and the limitations of the currently available Q Orbitrap acquisition modes. In addition, the incorporation of targeted acquisitions between full scan experiments is discussed. This approach is intended to integrate compounds that require an additional degree of sensitivity or selectivity into multi-residue methods. This article is protected by copyright. All rights reserved.

  14. 48 CFR 311.7001 - Section 508 accessibility standards for HHS Web site content and communications materials.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Section 508 accessibility... Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING DESCRIBING... acquisition of communications products and services, including content in any format, such as reports...

  15. 48 CFR 11.501 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 11.501 Section 11.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Liquidated Damages 11.501 Policy. (a) The contracting officer must consider the...

  16. PEL and Corridor Planning: State of the Practice Review of Planning and Environment Linkages Implementation in Corridor Planning

    DOT National Transportation Integrated Search

    2014-07-01

    The Federal Highway Administration (FHWA) commissioned a review of transportation corridor plans to determine the extent to which these plans have utilized FHWA's Planning and Environment Linkages (PEL) approach, as described in the FHWA Guidance on ...

  17. 40 CFR 205.54-2 - Sound data acquisition system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of 86 dB (rms) and the level indicated for an octave band of random noise of equal energy as the... Publication 179, Precision Sound Level Meters. (v) Magnetic tape recorders. No requirements are described in...) Calibrate tape recorders using the brand and type of magnetic tape used for actual data acquisition...

  18. Teaching Self-Determination and Arizona Standards for K-12 Students with Disabilities Lesson Plan Portfolio.

    ERIC Educational Resources Information Center

    Libby, Amanda

    This document presents eight lesson plans designed to teach self-determination and Arizona academic standards to students with disabilities in grades K-12. The lesson plans include: (1) an oral language lesson plan for students with learning disabilities in grades 1-2; (2) a reading acquisition lesson that teaches color words to students with…

  19. 48 CFR 3034.004 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Acquisition strategy. 3034.004 Section 3034.004 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND... Acquisition strategy. See (HSAR) 48 CFR 3009.570 for policy applicable to acquisition strategies that consider...

  20. 48 CFR 34.004 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acquisition strategy. 34... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION General 34.004 Acquisition strategy. The program manager, as specified in agency procedures, shall develop an acquisition strategy tailored to the particular...

  1. Kuwaiti Arabic: acquisition of singleton consonants.

    PubMed

    Ayyad, Hadeel Salama; Bernhardt, B May; Stemberger, Joseph P

    2016-09-01

    Arabic, a Semitic language of the Afro-Asiatic variety, has a rich consonant inventory. Previous studies on Arabic phonological acquisition have focused primarily on dialects in Jordan and Egypt. Because Arabic varies considerably across regions, information is also needed for other dialects. To determine acquisition benchmarks for singleton consonants for Kuwaiti Arabic-speaking 4-year-olds. Participants were 80 monolingual Kuwaiti Arabic-speaking children divided into two age groups: 46-54 and 55-62 months. Post-hoc, eight children were identified as possibly at risk for protracted phonological development. A native Kuwaiti Arabic speaker audio-recorded and transcribed single-word speech samples (88 words) that tested consonants across word positions within a variety of word lengths and structures. Transcription reliability (point-to-point) was 95% amongst the authors, and 87% with an external consultant. Three acquisition levels were designated that indicated the proportion of children with no mismatches ('errors') for a given consonant: 90%+ of children, 75-89%, fewer than 75%. Mismatch patterns were described in terms of a phonological feature framework previously described in the literature. The Kuwaiti 4-year-olds produced many singleton consonants accurately, including pharyngeals and uvulars. Although the older age group had fewer manner and laryngeal mismatches than the younger age group, consonants still developing at age 5 included coronal fricatives and affricates, trilled /r/ and some uvularized consonants ('emphatics'). The possible at-risk group showed mastery of fewer consonants than the other children. By feature category, place mismatches were the most common, primarily de-emphasis and lack of contrast for [coronal, grooved] (distinguishing alveolar from interdental fricatives). Manner mismatches were next most common: the most frequent substitutions were [+lateral] [l] or other rhotics for /r/, and stops for fricatives. Laryngeal mismatches were

  2. Fast imaging employing steady-state acquisition (FIESTA) MRI to investigate cerebrospinal fluid (CSF) within dural reflections of posterior fossa cranial nerves

    PubMed Central

    Scoffings, Daniel; Ajithkumar, Thankamma; Williams, Michael V; Jefferies, Sarah J

    2016-01-01

    Objective: There is no consensus approach to covering skull base meningeal reflections—and cerebrospinal fluid (CSF) therein—of the posterior fossa cranial nerves (CNs VII–XII) when planning radiotherapy (RT) for medulloblastoma and ependymoma. We sought to determine whether MRI and specifically fast imaging employing steady-state acquisition (FIESTA) sequences can answer this anatomical question and guide RT planning. Methods: 96 posterior fossa FIESTA sequences were reviewed. Following exclusions, measurements were made on the following scans for each foramen respectively (left, right); internal acoustic meatus (IAM) (86, 84), jugular foramen (JF) (83, 85) and hypoglossal canal (HC) (42, 45). A protocol describes measurement procedure. Two observers measured distances for five cases and agreement was assessed. One observer measured all the remaining cases. Results: IAM and JF measurement interobserver variability was compared. Mean measurement difference between observers was −0.275 mm (standard deviation 0.557). IAM and JF measurements were normally distributed. Mean IAM distance was 12.2 mm [95% confidence interval (CI) 8.8–15.6]; JF was 7.3 mm (95% CI 4.0–10.6). The HC was difficult to visualize on many images and data followed a bimodal distribution. Conclusion: Dural reflections of posterior fossa CNs are well demonstrated by FIESTA MRI. Measuring CSF extension into these structures is feasible and robust; mean CSF extension into IAM and JF was measured. We plan further work to assess coverage of these structures with photon and proton RT plans. Advances in knowledge: We have described CSF extension beyond the internal table of the skull into the IAM, JF and HC. Oncologists planning RT for patients with medulloblastoma and ependymoma may use these data to guide contouring. PMID:27636022

  3. Deveopment of Liquid Hydrogen Target and Data Acquisition System for MUSE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Briscoe, William John

    The product describes the results of an R and D grant to produce a conceptual design of a liquid hydrogen target and a data acquisition for the MUSE Proton Radius Measurement at the Paul Scherrer Institute in Villigen, Switzerland.

  4. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1992-01-01

    Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data and information. In the search for extraterrestrial intelligence (SETI), the TDA Progress Report reports on implementation and operations for searching the microwave spectrum. Topics covered include tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for new projects; network upgrade and sustaining; network operations and operations support; and TDA program management and analysis.

  5. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1992-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Office Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Operations (OSO). The TDA Office also performs work funded by two other NASA program offices through and with the cooperation of the OSO. These are the Orbital Debris Radar Program and 21st Century Communication Studies.

  6. The Relationship Between Perceptual Development and the Acquisition of Reading Skill. Final Report.

    ERIC Educational Resources Information Center

    Gibson, Eleanor J.

    The work described in this report is aimed at understanding the role of cognitive development, especially perceptual development, in the reading process and its acquisition. The papers included describe: (1) a theory of perceptual learning, (2) an investigation of the perception of morphological information, (3) the role of categorical semantic…

  7. Improving the Enterprise Requirements and Acquisition Model’s Developmental Test and Evaluation Process Fidelity

    DTIC Science & Technology

    2014-03-27

    and excluded from the model. The “Check SVR Loop” prevents programs from failing the SVR a second time. If a program has not previously failed the SVR...and Acquisition Management Plan Initiative. Briefing, Peterson AFB, CO: HQ AFSPC/A5X, 2011. Gilmore, Michael J., Key Issues Causing Prgram Delays

  8. Comprehensive Planning.

    ERIC Educational Resources Information Center

    Pavlenko, Victor V.

    Comprehensive planning, defined as the work of those who engage in efforts, within a delimited geographic area, to identify and order the physical, social, and economic relationships of that area, is discussed in the four sections of this paper. Section I, Introduction, describes what "planning" and "comprehensive planning" are. In Section II, Why…

  9. Fast data transmission in dynamic data acquisition system for plasma diagnostics

    NASA Astrophysics Data System (ADS)

    Byszuk, Adrian; Poźniak, Krzysztof; Zabołotny, Wojciech M.; Kasprowicz, Grzegorz; Wojeński, Andrzej; Cieszewski, Radosław; Juszczyk, Bartłomiej; Kolasiński, Piotr; Zienkiewicz, Paweł; Chernyshova, Maryna; Czarski, Tomasz

    2014-11-01

    This paper describes architecture of a new data acquisition system (DAQ) targeted mainly at plasma diagnostic experiments. Modular architecture, in combination with selected hardware components, allows for straightforward reconfiguration of the whole system, both offline and online. Main emphasis will be put into the implementation of data transmission subsystem in said system. One of the biggest advantages of described system is modular architecture with well defined boundaries between main components: analog frontend (AFE), digital backplane and acquisition/control software. Usage of a FPGA chips allows for a high flexibility in design of analog frontends, including ADC <--> FPGA interface. Data transmission between backplane boards and user software was accomplished with the use of industry-standard PCI Express (PCIe) technology. PCIe implementation includes both FPGA firmware and Linux device driver. High flexibility of PCIe connections was accomplished due to use of configurable PCIe switch. Whenever it's possible, described DAQ system tries to make use of standard off-the-shelf (OTF) components, including typical x86 CPU & motherboard (acting as PCIe controller) and cabling.

  10. User Manual for the AZ-101 Data Acquisition System (AS-101 DAS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRAYTON, D.D.

    2000-02-17

    User manual for the TK AZ-101 Waste Retrieval System Data Acquisition System. The purpose of this document is to describe use of the AZ-101 Data Acquisition System (AZ-101 DAS). The AZ-101 DAS is provided to fulfill the requirements for data collection and monitoring as defined in Letters of Instruction (LOI) from Numatec Hanford Corporation (NHC) to Fluor Federal Services (FFS). For a complete description of the system, including design, please refer to the AZ-101 DAS System Description document, RPP-5572.

  11. The application of a computer data acquisition system to a new high temperature tribometer

    NASA Technical Reports Server (NTRS)

    Bonham, Charles D.; Dellacorte, Christopher

    1991-01-01

    The two data acquisition computer programs are described which were developed for a high temperature friction and wear test apparatus, a tribometer. The raw data produced by the tribometer and the methods used to sample that data are explained. In addition, the instrumentation and computer hardware and software are presented. Also shown is how computer data acquisition was applied to increase convenience and productivity on a high temperature tribometer.

  12. The application of a computer data acquisition system for a new high temperature tribometer

    NASA Technical Reports Server (NTRS)

    Bonham, Charles D.; Dellacorte, Christopher

    1990-01-01

    The two data acquisition computer programs are described which were developed for a high temperature friction and wear test apparatus, a tribometer. The raw data produced by the tribometer and the methods used to sample that data are explained. In addition, the instrumentation and computer hardware and software are presented. Also shown is how computer data acquisition was applied to increase convenience and productivity on a high temperature tribometer.

  13. 48 CFR 5.704 - Publicizing preaward.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Publicizing preaward. 5.704 Section 5.704 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION...), use clear and concise language to describe the planned procurement. Use descriptions of the goods and...

  14. 48 CFR 11.302 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 11.302 Section 11.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Acceptable Material 11.302 Policy. (a) Agencies must not require virgin material or...

  15. 48 CFR 5.704 - Publicizing preaward.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Publicizing preaward. 5.704 Section 5.704 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION...), use clear and concise language to describe the planned procurement. Use descriptions of the goods and...

  16. 48 CFR 5.704 - Publicizing preaward.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Publicizing preaward. 5.704 Section 5.704 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION...), use clear and concise language to describe the planned procurement. Use descriptions of the goods and...

  17. 48 CFR 5.704 - Publicizing preaward.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Publicizing preaward. 5.704 Section 5.704 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION...), use clear and concise language to describe the planned procurement. Use descriptions of the goods and...

  18. 48 CFR 5.704 - Publicizing preaward.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Publicizing preaward. 5.704 Section 5.704 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION...), use clear and concise language to describe the planned procurement. Use descriptions of the goods and...

  19. 48 CFR 11.403 - Supplies or services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Supplies or services. 11.403 Section 11.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 11.403 Supplies or services. (a) The...

  20. 48 CFR 211.274-2 - Policy for item unique identification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Policy for item unique identification. 211.274-2 Section 211.274-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Using and Maintaining...