Sample records for act interim status

  1. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  2. Implementation of EPA criminal enforcement strategy for RCRA interim status facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-11-15

    The directive discusses criminal enforcement priorities and procedures related to the RCRA section 3007(e)(2) Loss of Interim Status (LOIS) provision, including: (1) identifying/targeting facilities with violations, (2) verifying receipt of RCRA 3007 letters, and (3) inspections of facilities. The directive supplements directive no. 9930.0-1 RCRA LOIS Enforcement Strategy, dated October 15, 1985. The directive is supplemented by directive no. 9930.0-2a, Accepting Nonhazardous Waste After Losing Interim Status, dated December 20, 1986.

  3. 40 CFR 270.72 - Changes during interim status.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the changes to the facility exceeds 50 percent of the capital cost of a comparable entirely new... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Changes during interim status. 270.72 Section 270.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES...

  4. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less

  5. 40 CFR 264.3 - Relationship to interim status standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Relationship to interim status standards. 264.3 Section 264.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES General § 264.3 Relationship to...

  6. RCRA, superfund and EPCRA hotline training module. Introduction to: Permits and interim status (40 cfr part 270) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    Owners/operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit, as required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The module presents an overview of the RCRA permitting process and the requirements that apply to TSDFs operating under interim status until a permit is issued. The regulations governing the permit process are found in 40 CFR Parts 124 through 270.

  7. Implementation of the Ryan Haight Online Pharmacy Consumer Protection Act of 2008. Interim final rule with request for comments.

    PubMed

    2009-04-06

    The Ryan Haight Online Pharmacy Consumer Protection Act, which was enacted on October 15, 2008, amended the Controlled Substances Act and Controlled Substances Import and Export Act by adding several new provisions to prevent the illegal distribution and dispensing of controlled substances by means of the Internet. DEA is hereby issuing an interim rule to amend its regulations to implement the legislation and is requesting comments on the interim rule.

  8. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Interim status incinerators burning... incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or FO27 if they receive a...

  9. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Interim status incinerators burning... incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or FO27 if they receive a...

  10. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Interim status incinerators burning... incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or FO27 if they receive a...

  11. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Interim status incinerators burning... incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or FO27 if they receive a...

  12. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Interim status incinerators burning... incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or FO27 if they receive a...

  13. Energy policy act transportation study: Interim report on natural gas flows and rates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-17

    This report, Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates, is the second in a series mandated by Title XIII, Section 1340, ``Establishment of Data Base and Study of Transportation Rates,`` of the Energy Policy Act of 1992 (P.L. 102--486). The first report Energy Policy Act Transportation Study: Availability of Data and Studies, was submitted to Congress in October 1993; it summarized data and studies that could be used to address the impact of legislative and regulatory actions on natural gas transportation rates and flow patterns. The current report presents an interim analysis of naturalmore » gas transportation rates and distribution patterns for the period from 1988 through 1994. A third and final report addressing the transportation rates and flows through 1997 is due to Congress in October 2000. This analysis relies on currently available data; no new data collection effort was undertaken. The need for the collection of additional data on transportation rates will be further addressed after this report, in consultation with the Congress, industry representatives, and in other public forums.« less

  14. 40 CFR 267.2 - What is the relationship to interim status standards?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What is the relationship to interim status standards? 267.2 Section 267.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT General § 267.2...

  15. Report: EPA’s Management of Interim Status Permitting Needs Improvement to Ensure Continued Progress

    EPA Pesticide Factsheets

    Report #2007-P-00005, December 4, 2006. Interim status is a temporary designation, but some units have existed for as many as 25 years without formal issuance or denial of a permit, or other regulatory controls.

  16. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ...This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  17. Health insurance issuers implementing medical loss ratio (MLR) requirements under the Patient Protection and Affordable Care Act. Interim final rule with request for comments.

    PubMed

    2010-12-01

    This document contains the interim final regulation implementing medical loss ratio (MLR) requirements for health insurance issuers under the Public Health Service Act, as added by the Patient Protection and Affordable Care Act (Affordable Care Act).

  18. Tribal child welfare. Interim final rule.

    PubMed

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  19. Procedures for the handling of retaliation complaints under section 1558 of the Affordable Care Act. Interim final rule; request for comments.

    PubMed

    2013-02-27

    This document provides the interim final regulations governing the employee protection (whistleblower) provision of section 1558 of the Affordable Care Act, which added section 18C of the Fair Labor Standards Act, to provide protections to employees of health insurance issuers or other employers who may have been subject to retaliation for reporting potential violations of the law's consumer protections (e.g., the prohibition on denials of insurance due to pre-existing conditions) or affordability assistance provisions (e.g., access to health insurance premium tax credits). This interim rule establishes procedures and time frames for the handling of retaliation complaints under section 18C, including procedures and time frames for employee complaints to the Occupational Safety and Health Administration (OSHA), investigations by OSHA, appeals of OSHA determinations to an administrative law judge (ALJ) for a hearing de novo, hearings by ALJs, review of ALJ decisions by the Administrative Review Board (ARB) (acting on behalf of the Secretary of Labor), and judicial review of the Secretary's final decision.

  20. French Interim MALE UAV Program

    DTIC Science & Technology

    2003-09-02

    MINISTÈRE DE LA DÉFENSE June, 13th 2002 Lcl Monsterleet FAF Staff J. Caron EADS S&DE-ISR FRENCH INTERIM MALE UAV PROGRAM 4 INDUSTRIAL STATUS Report...2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Interim Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) EADS

  1. The Family and Medical Leave Act of 1993--Wage and Hour Division, Department of Labor. Interim final rule; request for comments.

    PubMed

    1993-06-04

    This document contains interim regulations implementing the Family and Medical Leave Act of 1993 called ("FMLA" or "the Act"). The Act is effective on August 5, 1993, six months from the date of its enactment. Where a collective bargaining agreement is in effect on August 5, 1993, the Act is effective when the collective bargaining agreement terminates or February 5, 1994, whichever is earlier. The purpose of these regulations is to set forth the requirements of Title I and Title IV of the Act. Title I applies to covered private employers and public agencies (except for most of the Federal Government, which is governed by Title II). Title IV of the Act primarily concerns the relationship between FMLA and other laws, as well as collective bargaining agreements and other employer plans and programs.

  2. National School Lunch Program and School Breakfast Program: Nutrition Standards for All Foods Sold in School as Required by the Healthy, Hunger-Free Kids Act of 2010. Final rule and interim final rule.

    PubMed

    2016-07-29

    This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.

  3. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...

  4. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  5. TRICARE; changes included in the National Defense Authorization Act for fiscal year 2005; TRICARE Dental Program. Interim final rule.

    PubMed

    2005-09-21

    The Department is publishing this interim final rule to implement sections 711 and 715 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA-05), Public Law 108-375. Specifically, that legislation makes young dependents of deceased Service members eligible for enrollment in the TRICARE Dental Program when the child was not previously enrolled because of age, and authorizes post-graduate dental residents in a dental treatment facility of the uniformed services under a graduate dental education program accredited by the American Dental Association to provide dental treatment to dependents who are 12 years of age or younger and who are covered by a dental plan established under 10 U.S.C. 1076a. This rule also corrects certain references in 32 CFR 199.13. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates. Public comments are invited and will be considered for possible revisions to the final rule.

  6. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench beganmore » in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.« less

  7. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  8. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  9. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....

  10. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Interim disaster procedures. 280.1 Section 280.1 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... to exercise the authority provided for by section 302(a) of the Disaster Relief Act of 1974...

  11. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Interim disaster procedures. 280.1 Section 280.1 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... to exercise the authority provided for by section 302(a) of the Disaster Relief Act of 1974...

  12. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Interim disaster procedures. 280.1 Section 280.1 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... to exercise the authority provided for by section 302(a) of the Disaster Relief Act of 1974...

  13. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  14. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...

  15. 75 FR 63655 - Countermeasures Injury Compensation Program (CICP): Administrative Implementation, Interim Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Administration (HRSA), HHS. ACTION: Interim final rule with request for comments. SUMMARY: The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of...

  16. 77 FR 25910 - National Trails System Act and Railroad Rights-of-Way

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION...) for rail banking and interim trail use under the National Trails System Act (Trails Act). New rules are adopted that require the parties jointly to notify the Board when an interim trail use/rail...

  17. Acoustic emission monitoring of steel bridge members : interim report.

    DOT National Transportation Integrated Search

    1995-01-01

    This interim report describes the current status of acoustic emission (AE) monitoring of steel bridge members. The report includes a brief introduction to the theory of acoustic emission and a comprehensive summary of previous efforts to apply AE mon...

  18. Interim Alternative Educational Settings for Children with Disabilities.

    ERIC Educational Resources Information Center

    Bear, George G.; Quinn, Mary Magee; Burkholder, Susan

    This manual is intended to guide school administrators, teachers, school psychologists, and others with the design and implementation of interim alternative education settings (IAES) in compliance with the Individuals with Disabilities Education Act (IDEA) as amended in 1997. Chapter 1 discusses how the IAES evolved as a means of balancing the…

  19. 75 FR 8013 - Serve America Act Amendments to the National and Community Service Act of 1990

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... implement changes to the operation of the National Service Trust under the Serve America Act. This proposed... Corporation issued an interim final rule to implement time-sensitive changes to the Corporation's AmeriCorps... changes resulting from the interim final rule were required as a result of amendments to the NCSA and DVSA...

  20. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... the CMAQ Program as a result of the enactment of the Moving Ahead for Progress in the 21st Century Act (MAP-21). The Interim Guidance also contains changes to clarify the 2008 CMAQ Program Guidance. Because... Act for the 21st Century (TEA-21) (Pub. L. 105-178; Oct. 1998) and the Safe, Accountable, Flexible...

  1. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  2. The Evaluation of Abstinence Education Programs Funded Under Title V Section 510: Interim Report.

    ERIC Educational Resources Information Center

    Devaney, Barbara; Johnson, Amy; Maynard, Rebecca; Trenholm, Chris

    This report presents interim findings from an independent, federally funded evaluation of the abstinence education programs authorized under the Personal Responsibility and Work Opportunity Reconciliation Act (PRWORA) and defined under Title V, Section 510 (b)(2)(A-H) of the Social Security Act. The report draws heavily on 4 years of…

  3. 75 FR 64147 - Privacy Act; Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... DEPARTMENT OF THE TREASURY Office of the Secretary 31 CFR Part 1 Privacy Act; Implementation... adopting, without change, an interim rule that amended its regulations on the Privacy Act of 1974, as Amended, by removing three Privacy Act systems of records from this part, revising the title of the one...

  4. Interim Testing, Socio-Economic Status, and the Odds of Passing Grade 8 State Tests in New Jersey

    ERIC Educational Resources Information Center

    Babo, Gerard; Tienken, Christopher H.; Gencarelli, Maria A.

    2014-01-01

    A review of the literature pertaining to the effect and influence of commercially-prepared interim assessments in mathematics and language arts literacy reveals a lack of quantitative data to determine the value of these products for school reform. This study examined the ability of commercially-prepared interim pretest and posttest assessments in…

  5. 75 FR 53153 - Federal Acquisition Regulation; American Recovery and Reinvestment Act of 2009 (the Recovery Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ...The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (the Councils) have adopted as final, with changes, an interim rule amending the Federal Acquisition Regulation (FAR) to implement the American Recovery and Reinvestment Act of 2009 (Recovery Act) with respect to the ``Buy American--Recovery Act'' provision, section 1605 in Division A.

  6. The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions

    NASA Technical Reports Server (NTRS)

    Kruk, Jeffrey W.

    2012-01-01

    The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.

  7. Undocumented & Unafraid: The DREAM Act 5 and the Public Disclosure of Undocumented Status as a Political Act

    ERIC Educational Resources Information Center

    Galindo, Rene

    2012-01-01

    In 2010, the political advocacy of undocumented immigrant students in support of the DREAM Act took a new and decisive direction when the public disclosure of undocumented status as political act was adopted. This new political strategy included the first case of civil disobedience practiced by a group of undocumented immigrant students now known…

  8. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  9. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  10. Atmospheric Effects of Subsonic Aircraft: Interim Assessment Report of the Advanced Subsonic Technology Program

    NASA Technical Reports Server (NTRS)

    Friedl, Randall R. (Editor)

    1997-01-01

    This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.

  11. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  12. Interim overdentures.

    PubMed

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  13. Interim rules for amending ERISA disclosure requirements for group health plans; approval of information collection requirements--DoL. Interim rules; approval of information collection requirements.

    PubMed

    1997-07-07

    On April 8, 1997, the Department of Labor published interim final rules governing disclosure requirements for private sector group health plans (62 FR 16979). The rules implemented changes to made to certain provisions of the Employee Retirement Income Security Act of 1974 (ERISA), enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). In the April 8 publication, the Department submitted its revision of the currently approved collection regarding Summary Plan Description requirements under ERISA to the Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1965 (PRA 95). This document amends the April 8 Federal Register document to properly display the OMB control number, 1210-0039.

  14. RCRA, superfund and EPCRA hotline training module. Introduction to: Groundwater monitoring (40 cfr parts 264/265, subpart f) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities (TSDFs) under the Resource Conservation and Recovery Act (RCRA). The goal of the module is to explain the standards and specific requirements for groundwater monitoring programs at interim status and permitted facilities.

  15. Terrestrial gravity data analysis for interim gravity model improvement

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  16. 76 FR 78977 - Real Estate Settlement Procedures Act (Regulation X)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ...Title X of the Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) transferred rulemaking authority for a number of consumer financial protection laws from seven Federal agencies to the Bureau of Consumer Financial Protection (Bureau) as of July 21, 2011. The Bureau is in the process of republishing the regulations implementing those laws with technical and conforming changes to reflect the transfer of authority and certain other changes made by the Dodd-Frank Act. In light of the transfer of the Department of Housing and Urban Development's (HUD's) rulemaking authority for the Real Estate Settlement Procedures Act (RESPA) to the Bureau, the Bureau is publishing for public comment an interim final rule establishing a new Regulation X (Real Estate Settlement Procedures Act). This interim final rule does not impose any new substantive obligations on persons subject to the existing Regulation X, previously published by HUD.

  17. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...

  18. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  19. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  20. Comparisons of Cooperative and Non-Cooperative Students: An Analysis of Student Accounting System Data. Interim Report, June, 1981.

    ERIC Educational Resources Information Center

    Frazier, Don

    The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…

  1. INTERIM -- Starlink Software Environment

    NASA Astrophysics Data System (ADS)

    Pearce, Dave; Pavelin, Cliff; Lawden, M. D.

    Early versions of this paper were based on a number of other papers produced at a very early stage of the Starlink project. They contained a description of a specific implementation of a subroutine library, speculations on the desirable attributes of a software environment, and future development plans. They reflected the experimental nature of the Starlink software environment at that time. Since then, the situation has changed. The implemented subroutine library, INTERIM_DIR:INTERIM.OLB, is now a well established and widely used piece of software. A completely new Starlink software environment (ADAM) has been developed and distributed. Thus the library released in 1980 as `STARLINK' and now called `INTERIM' has reached the end of its development cycle and is now frozen in its current state, apart from bug corrections. This paper has, therefore, been completely rewritten and restructured to reflect the new situation. Its aim is to describe the facilities of the INTERIM subroutine library as clearly and concisely as possible. It avoids speculation, discussion of design decisions, and announcements of future plans.

  2. 78 FR 72897 - Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ...] Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing... Compounding Outsourcing Facilities Under Section 503B of the Federal Food, Drug, and Cosmetic Act.'' The draft... human drug compounders that choose to register as outsourcing facilities (outsourcing facilities). DATES...

  3. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  4. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  5. CT-based texture analysis potentially provides prognostic information complementary to interim fdg-pet for patients with hodgkin's and aggressive non-hodgkin's lymphomas.

    PubMed

    Ganeshan, B; Miles, K A; Babikir, S; Shortman, R; Afaq, A; Ardeshna, K M; Groves, A M; Kayani, I

    2017-03-01

    The purpose of this study was to investigate the ability of computed tomography texture analysis (CTTA) to provide additional prognostic information in patients with Hodgkin's lymphoma (HL) and high-grade non-Hodgkin's lymphoma (NHL). This retrospective, pilot-study approved by the IRB comprised 45 lymphoma patients undergoing routine 18F-FDG-PET-CT. Progression-free survival (PFS) was determined from clinical follow-up (mean-duration: 40 months; range: 10-62 months). Non-contrast-enhanced low-dose CT images were submitted to CTTA comprising image filtration to highlight features of different sizes followed by histogram-analysis using kurtosis. Prognostic value of CTTA was compared to PET FDG-uptake value, tumour-stage, tumour-bulk, lymphoma-type, treatment-regime, and interim FDG-PET (iPET) status using Kaplan-Meier analysis. Cox regression analysis determined the independence of significantly prognostic imaging and clinical features. A total of 27 patients had aggressive NHL and 18 had HL. Mean PFS was 48.5 months. There was no significant difference in pre-treatment CTTA between the lymphoma sub-types. Kaplan-Meier analysis found pre-treatment CTTA (medium feature scale, p=0.010) and iPET status (p<0.001) to be significant predictors of PFS. Cox analysis revealed that an interaction between pre-treatment CTTA and iPET status was the only independent predictor of PFS (HR: 25.5, 95% CI: 5.4-120, p<0.001). Specifically, pre-treatment CTTA risk stratified patients with negative iPET. CTTA can potentially provide prognostic information complementary to iPET for patients with HL and aggressive NHL. • CT texture-analysis (CTTA) provides prognostic information complementary to interim FDG-PET in Lymphoma. • Pre-treatment CTTA and interim PET status were significant predictors of progression-free survival. • Patients with negative interim PET could be further stratified by pre-treatment CTTA. • Provide precision surveillance where additional imaging reserved for

  6. Workforce Investment Act: Interim Report on Status of Spending and States' Available Funds. Report to Congressional Requesters.

    ERIC Educational Resources Information Center

    Nilsen, Sigurd R.

    A study assessed whether the Department of Labor's (DOL's) information on states' Workforce Investment Act of 1998 (WIA) spending was a true reflection of states' available funds. The most recent available spending data from DOL and the 50 states were analyzed. Interviews were conducted with state workforce officials in nine states, local…

  7. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...

  8. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  9. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...

  10. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.

  11. 76 FR 8992 - National Trails System Act and Railroad Rights-of-Way

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION... procedures regarding the use of railroad rights-of-way for railbanking and interim trail use under the National Trails System Act (Trails Act). DATES: Comments are due by April 12, 2011; replies are due by May...

  12. Coverage of Certain Preventive Services Under the Affordable Care Act. Final rules.

    PubMed

    2015-07-14

    This document contains final regulations regarding coverage of certain preventive services under section 2713 of the Public Health Service Act (PHS Act), added by the Patient Protection and Affordable Care Act, as amended, and incorporated into the Employee Retirement Income Security Act of 1974 and the Internal Revenue Code. Section 2713 of the PHS Act requires coverage without cost sharing of certain preventive health services by non-grandfathered group health plans and health insurance coverage. These regulations finalize provisions from three rulemaking actions: Interim final regulations issued in July 2010 related to coverage of preventive services, interim final regulations issued in August 2014 related to the process an eligible organization uses to provide notice of its religious objection to the coverage of contraceptive services, and proposed regulations issued in August 2014 related to the definition of "eligible organization,'' which would expand the set of entities that may avail themselves of an accommodation with respect to the coverage of contraceptive services.

  13. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...

  14. Medical loss ratio rebate requirements for non-federal governmental plans. Interim final rule with request for comments.

    PubMed

    2011-12-07

    This interim final rule with comment period revises the regulations implementing medical loss ratio (MLR) requirements for health insurance issuers under the Public Health Service Act in order to establish rules governing the distribution of rebates by issuers in group markets for non-Federal governmental plans.

  15. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...

  16. Compulsory license for cable systems--Copyright Office, Library of Congress. Interim regulations.

    PubMed

    1982-05-20

    This notice is issued to inform the public that the Copyright Office of the Library of Congress is adopting interim amendments to 201.11 and 201.17 as amended on June 27, 1978 and July 3, 1980 respectively. These regulations implement portions of section 111 of the Copyright Act of 1976, title 17 of the United States Code. That section prescribes conditions under which cable systems may obtain a compulsory license to retransmit copyrighted works, including the filing of Notices of Identity and Signal Carriage Complement and Statements of Account, and the submission of statutory royalty fees. The effect of the amendments is to modify the filing requirements and royalty fee calculations necessitated by changes in the rules and regulations of the Federal Communications Commission. The amendments are issued on an interim basis in order to permit their immediate application while allowing full public comment.

  17. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voegele, Michael D.; Vieth, Donald

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste

  18. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  19. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  20. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  1. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  2. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  3. 8 CFR 1245.3 - Adjustment of status under section 13 of the Act of September 11, 1957, as amended.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Adjustment of status under section 13 of... OF PERSON ADMITTED FOR PERMANENT RESIDENCE § 1245.3 Adjustment of status under section 13 of the Act of September 11, 1957, as amended. Any application for benefits under section 13 of the Act of...

  4. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...

  5. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  6. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  7. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  8. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  9. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  10. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...

  11. Interim Administrators in Higher Education: A National Study

    ERIC Educational Resources Information Center

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  12. 76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 120 RIN 3245-AG17 Small Business Jobs Act: 504 Loan Program Debt Refinancing AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule finalizes the interim final rule that implemented section 1122 of the Small Business Jobs Act of...

  13. 8 CFR 245.3 - Adjustment of status under section 13 of the Act of September 11, 1957, as amended.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Adjustment of status under section 13 of... RESIDENCE § 245.3 Adjustment of status under section 13 of the Act of September 11, 1957, as amended. Any application for benefits under section 13 of the Act of September 11, 1957, as amended, must be filed on Form...

  14. 76 FR 12926 - Clean Air Act Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY... Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating Permit Program (Title V Program) was submitted for the purpose of administering a tribal...

  15. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  16. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  17. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    NASA Astrophysics Data System (ADS)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  18. Consolidated permit regulations and hazardous waste management system: Environmental Protection Agency. Notice of issuance of regulation interpretation memorandum.

    PubMed

    1981-12-10

    The Environmental Protection Agency (EPA) is issuing today a Regulation Interpretation Memorandum (RIM) which provides official interpretation of the issue of whether a generator who accumulates hazardous waste pursuant to 40 CFR 262.34, may qualify for interim status after November 19, 1980. This issue arose when the requirements for submitting a Part A permit application (one of the prerequisites to qualifying for interim status) were amended on November 19, 1980. The provisions interpreted today are part of the Consolidated Permit Regulations promulgated under Subtitle C of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as amended (RCRA).

  19. 8 CFR 245.8 - Adjustment of status as a special immigrant under section 101(a)(27)(K) of the Act.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... under section 101(a)(27)(K) of the Act. 245.8 Section 245.8 Aliens and Nationality DEPARTMENT OF... RESIDENCE § 245.8 Adjustment of status as a special immigrant under section 101(a)(27)(K) of the Act. (a) Application. Each person applying for adjustment of status as a special immigrant under section 101(a)(27)(K...

  20. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  1. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  2. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  3. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  4. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  5. 76 FR 67385 - Claims Procedures Under the Oil Pollution Act of 1990

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ...-AA03 Claims Procedures Under the Oil Pollution Act of 1990 AGENCY: Coast Guard, DHS. ACTION: Notice of... finalize a 1992 interim rule that set forth the Oil Pollution Act of 1990 (OPA'90) claims procedures and... Pollution Funds Center, U.S. Coast Guard, telephone (202) 493-6863, email [email protected] . If you...

  6. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...

  7. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...

  8. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  9. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  10. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  11. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH...

  12. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH...

  13. Grants for nurse practitioner traineeship programs--PHS. Interim final regulations.

    PubMed

    1984-08-01

    These regulations set forth requirements for grants to schools of nursing, medicine, and public health, to public or nonprofit private hospitals, and to other public or nonprofit private entities to meet the costs of traineeships for training nurse practitioners. A trainee must sign a commitment with the Secretary to practice full-time as a nurse practitioner in a primary medical care health manpower shortage area, designated under section 332 of the Public Health Service Act (the Act), for a period equal to 1 month for each month of traineeship support, after completion of the training. If this obligation is not fulfilled, a trainee must pay back traineeship support. The purpose of these regulations is to respond to the comments on the 1980 interim final regulations and to conform 42 CFR Part 57, Subpart AA, with the Paperwork Reduction Act of 1980, Pub. L. 96-511, and with the Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35, which requires, among other provisions, that the Secretary provide, by regulation, for the waiver or suspension of the repayment obligation under certain conditions. In addition, other minor changes have been made and Office of Management and Budget (OMB) numbers are cited in those sections which have approved reporting and recordkeeping requirements.

  14. Evaluation of ERA-Interim precipitation data in complex terrain

    NASA Astrophysics Data System (ADS)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  15. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  16. Into the Sunset: Reflections of an Interim Administrator.

    ERIC Educational Resources Information Center

    Marlowe, John

    2000-01-01

    One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)

  17. Interim Budget Plan.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This report provides the interim budget plan of the U.S. Department of Education's Office of Student Financial Assistance (OSFA) for fiscal year 2000. It reviews factors influencing OSFA's budget request, including legislative requirements, recent accomplishments, the need to maintain both the Direct Loan and Federal Family Education Loan…

  18. A Compensatory Educational Program on the Higher Education Level for a Culturally Deprived Group in Israel. An Interim Report, February 1968.

    ERIC Educational Resources Information Center

    Perlberg, Arye; Rom, Yael

    This resume of an interim report discusses a university preparatory program for Israeli soldiers of Islamic (Sephardic) origin. The Israeli Defense Forces identify and select the candidates, who must be of Sephardic, low socioeconomic status background and have certificates from academic or vocational high schools. The chosen students are soldiers…

  19. CMM Interim Check Design of Experiments (U)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factorsmore » (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.« less

  20. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...

  1. Faculty and Student Views of the Interim Term

    ERIC Educational Resources Information Center

    Centra, John A.; Sobol, Marion G.

    1974-01-01

    Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)

  2. Publishing interim results of randomised clinical trials in peer-reviewed journals.

    PubMed

    Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan

    2017-02-01

    Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim

  3. H. R. 3692: a bill to modify the deadlines applicable to hazardous waste disposal facilities. A report submitted to the House of Representatives, Ninety-Ninth Congress, First Session, November 6, 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-01-01

    This bill amends the Solid Waste Disposal Act to change the deadlines when facilities must certify that they are in compliance with the financial requirements of the Act; i.e., that they have obtained appropriate insurance policies and other protection as required by law. The bill delays compliance during interim status in terms of groundwater monitoring, with interim status terminating on November 8, 1987. The bill covers facilities which were in compliance, but whose insurance policies were later cancelled, those with revenues in the July 1981-1982 fiscal year of less than $5 million, those in states whose requirement came into effectmore » after November 8, 1984, and those which can document a good-faith effort to comply.« less

  4. Human altruistic tendencies vary with both the costliness of selfless acts and socioeconomic status.

    PubMed

    Grueter, Cyril C; Ingram, Jesse A; Lewisson, James W; Bradford, Olivia R; Taba, Melody; Coetzee, Rebecca E; Sherwood, Michelle A

    2016-01-01

    Altruism toward strangers is considered a defining feature of humans. However, manifestation of this behaviour is contingent on the costliness of the selfless act. The extent of altruistic tendencies also varies cross-culturally, being more common in societies with higher levels of market integration. However, the existence of local variation in selfless behaviour within populations has received relatively little empirical attention. Using a 'lost letter' design, we dropped 300 letters (half of them stamped, half of them unstamped) in 15 residential suburbs of the greater Perth area that differ markedly in socioeconomic status. The number of returned letters was used as evidence of altruistic behaviour. Costliness was assessed by comparing return rates for stamped vs. unstamped letters. We predicted that there is a positive association between suburb socioeconomic status and number of letters returned and that altruistic acts decrease in frequency when costs increase, even minimally. Both predictions were solidly supported and demonstrate that socioeconomic deprivation and elevated performance costs independently impinge on the universality of altruistic behaviour in humans.

  5. Human altruistic tendencies vary with both the costliness of selfless acts and socioeconomic status

    PubMed Central

    Ingram, Jesse A.; Lewisson, James W.; Bradford, Olivia R.; Taba, Melody; Coetzee, Rebecca E.; Sherwood, Michelle A.

    2016-01-01

    Altruism toward strangers is considered a defining feature of humans. However, manifestation of this behaviour is contingent on the costliness of the selfless act. The extent of altruistic tendencies also varies cross-culturally, being more common in societies with higher levels of market integration. However, the existence of local variation in selfless behaviour within populations has received relatively little empirical attention. Using a ‘lost letter’ design, we dropped 300 letters (half of them stamped, half of them unstamped) in 15 residential suburbs of the greater Perth area that differ markedly in socioeconomic status. The number of returned letters was used as evidence of altruistic behaviour. Costliness was assessed by comparing return rates for stamped vs. unstamped letters. We predicted that there is a positive association between suburb socioeconomic status and number of letters returned and that altruistic acts decrease in frequency when costs increase, even minimally. Both predictions were solidly supported and demonstrate that socioeconomic deprivation and elevated performance costs independently impinge on the universality of altruistic behaviour in humans. PMID:27812415

  6. 8 CFR 1245.8 - Adjustment of status as a special immigrant under section 101(a)(27)(K) of the Act.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... under section 101(a)(27)(K) of the Act. 1245.8 Section 1245.8 Aliens and Nationality EXECUTIVE OFFICE... section 101(a)(27)(K) of the Act. (a) Application. Each person applying for adjustment of status as a special immigrant under section 101(a)(27)(K) of the Act must file a Form I-485, Application to Register...

  7. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    NASA Technical Reports Server (NTRS)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  8. A security vulnerabilities assessment tool for interim storage facilities of low-level radioactive wastes.

    PubMed

    Bible, J; Emery, R J; Williams, T; Wang, S

    2006-11-01

    Limited permanent low-level radioactive waste (LLRW) disposal capacity and correspondingly high disposal costs have resulted in the creation of numerous interim storage facilities for either decay-in-storage operations or longer term accumulation efforts. These facilities, which may be near the site of waste generation or in distal locations, often were not originally designed for the purpose of LLRW storage, particularly with regard to security. Facility security has become particularly important in light of the domestic terrorist acts of 2001, wherein LLRW, along with many other sources of radioactivity, became recognized commodities to those wishing to create disruption through the purposeful dissemination of radioactive materials. Since some LLRW materials may be in facilities that may exhibit varying degrees of security control sophistication, a security vulnerabilities assessment tool grounded in accepted criminal justice theory and security practice has been developed. The tool, which includes dedicated sections on general security, target hardening, criminalization benefits, and the presence of guardians, can be used by those not formally schooled in the security profession to assess the level of protection afforded to their respective facilities. The tool equips radiation safety practitioners with the ability to methodically and systematically assess the presence or relative status of various facility security aspects, many of which may not be considered by individuals from outside the security profession. For example, radiation safety professionals might not ordinarily consider facility lighting aspects, which is a staple for the security profession since it is widely known that crime disproportionately occurs more frequently at night or in poorly lit circumstances. Likewise, the means and associated time dimensions for detecting inventory discrepancies may not be commonly considered. The tool provides a simple means for radiation safety professionals to

  9. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  10. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  11. Elder Abuse Demonstration Project. Third Interim Report to the Illinois General Assembly on Public Acts 83-1259 and 83-1432.

    ERIC Educational Resources Information Center

    Illinois State Dept. on Aging, Springfield.

    This document contains the third annual interim report of the Illinois Elder Abuse Demonstration Program. It discusses the overall intent of the demonstration program, trends and changes in the third year of the demonstration program compared with the results from the first two years of the program, and achievements and recommendations for a…

  12. 8 CFR 245.8 - Adjustment of status as a special immigrant under section 101(a)(27)(K) of the Act.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Adjustment of status as a special immigrant... RESIDENCE § 245.8 Adjustment of status as a special immigrant under section 101(a)(27)(K) of the Act. (a) Application. Each person applying for adjustment of status as a special immigrant under section 101(a)(27)(K...

  13. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  14. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  15. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  16. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  17. Grants and cooperative agreements to state and local governments, universities, hospitals, and other non-profit organizations--USDA. Interim final rule.

    PubMed

    1997-08-29

    This interim final rule amendment is issued to implement the Single Audit Act Amendments of 1996 (Public Law 104-156, 110 Stat. 1396) and the June 24, 1997, revision of OMB Circular A-133, "Audits of States, Local Governments, and Non-Profit Organizations" and to replace the existing audit requirements that are superseded by Public Law 104-156 and the revised A-133.

  18. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  19. 77 FR 25630 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    .... 120316196-2195-01] RIN 0648-BB89 Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Interim Action; Withdrawn AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA...

  20. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  1. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  2. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  3. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  4. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  5. Status of Clean Air Act (CAA) 110(a)(2)(D)(i)(I) SIPs Final Rule TSD

    EPA Pesticide Factsheets

    This document describes, for each state subject to a Federal implementation plan (FIP) with respect to ozone and/or PM2.5 NAAQS under the Transport Rule, the status of each Clean Air Act state implementation plan (SIP) for the relevant NAAQS.

  6. Medicare program; changes to the Medicare claims appeal procedures; continuation of effectiveness and extension of timeline for publication of final rule. Interim final rule with comment period; continuation of effectiveness and extension of timeline for publication of final rule.

    PubMed

    2009-02-27

    This notice announces the continuation of effectiveness of a Medicare interim final rule with comment period and the extension of the timeline for publication of the final rule. This notice is issued in accordance with section 1871(a)(3)(C) of the Social Security Act (the Act), which allows an interim final rule to remain in effect after the expiration of the timeline specified in section 1871(a)(3)(B) of the Act (the "regular timeline") or, if applicable, at the end of each succeeding 1-year extension to the regular timeline, if prior to the expiration of the timeline, the Secretary publishes in the Federal Register a notice of continuation and explains why the regular timeline or any subsequent extension was not complied with.

  7. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  8. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...

  9. 75 FR 56601 - Privacy Act of 1974: New System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ...The Patient Protection and Affordable Care Act (the Affordable Care Act), Public Law 111-148, was enacted on March 23, 2010; the Health Care and Education Reconciliation Act (the Reconciliation Act), Public Law 111-152, was enacted on March 30, 2010. The Affordable Care Act and implementing regulations (codified in HHS interim final rules (IFR) at 45 CFR Part 147) require that non-grandfathered health insurance plans and issuers offering group and individual coverage have effective internal claims and appeals and external review processes. The effective date for these requirements is plan or policy years beginning on or after September 23, 2010. Regarding external review, the statute requires that health plans and issuers must comply with either a state external review process or a process meeting standards issued by the Secretary of Health and Human Services (HHS) that is ``similar to'' a state process meeting requirements in section 2719 (a ``federal external review process''). The IFR includes a transition period prior to July 1, 2011, during which time HHS will work with states to assist in making any necessary changes so that the state process will meet the minimum consumer protections identified in 45 CFR 147.136 that must be met in order for the state process to apply. During this interim period, health insurance issuers in states with external review laws in effect prior to September 23, 2010 will follow that state's external review law to the extent applicable. In states that have not passed an external review law that is in effect on September 23, 2010, a health insurance issuer must follow an interim federal external review process that will be administered by the Office of Personnel Management (OPM). The system of records will be created as OPM assists HHS by providing external reviews of adverse benefit determinations and final internal adverse benefit determinations as requested by eligible claimants and their authorized representatives

  10. A randomized controlled trial of interim methadone maintenance.

    PubMed

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (P<.001). Overall, in the past 30 days at follow-up, interim participants reported significantly fewer days of heroin use (P<.001), had a significant reduction in heroin-positive drug test results (P<.001), reported spending less money on drugs (P<.001), and received less illegal income (P<.02) than the waiting list participants. Interim methadone maintenance results in a

  11. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  12. The Influence of Deaf People's Dual Category Status on Sign Language Planning: The British Sign Language (Scotland) Act (2015)

    ERIC Educational Resources Information Center

    De Meulder, Maartje

    2017-01-01

    Through the British Sign Language (Scotland) Act, British Sign Language (BSL) was given legal status in Scotland. The main motives for the Act were a desire to put BSL on a similar footing with Gaelic and the fact that in Scotland, BSL signers are the only group whose first language is not English who must rely on disability discrimination…

  13. 78 FR 26117 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ...Through this interim final rule, NMFS announces that it partially approves Framework Adjustment 48 to the NE Multispecies Fishery Management Plan (FMP) and implements the approved measures in the regulations. Framework 48 is the first of two parallel and related actions developed by the New England Fishery Management Council (Council) to respond to updated stock status information and to adjust other management measures in the NE multispecies (groundfish) fishery beginning in fishing year (FY) 2013. This action implements new status determination criteria for Gulf of Maine (GOM) cod, Georges Bank (GB) cod, Southern New England/Mid-Atlantic (SNE/MA) yellowtail flounder, and white hake based on new benchmark assessments completed for these stocks in 2012 and 2013. NMFS is approving and implementing updated status determination criteria for white hake through this interim final rule and accepting further comment on this measure since it was not available for comment in the Framework 48 proposed rule. NMFS will publish a subsequent final rule to respond to any comments received, if necessary. Through this action, NMFS has also approved and is implementing the following Framework 48 measures: Elimination of dockside monitoring requirements for the groundfish fishery; lower minimum fish sizes for several groundfish stocks; clarified goals and performance standard for groundfish monitoring programs; revisions to the allocation of GB yellowtail flounder to the scallop fishery; and establishment of sub-annual catch limits (ACLs) of GB yellowtail flounder and SNE/MA windowpane flounder for the scallop and other non- groundfish fisheries. NMFS also approved revisions to recreational and commercial accountability measures (AMs), including amendments to existing AMs for windowpane flounder, ocean pout, and Atlantic halibut, and new ``reactive'' AMs for Atlantic wolffish and SNE/MA winter flounder, to address a remand by the U.S. District Court of Appeals. NMFS disapproved

  14. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 13 2012-10-01 2012-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  15. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 13 2013-10-01 2013-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  16. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  17. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 13 2014-10-01 2014-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  18. Remittance Status Verification Act of 2013

    THOMAS, 113th Congress

    Sen. Vitter, David [R-LA

    2013-06-18

    Senate - 06/18/2013 Read twice and referred to the Committee on Banking, Housing, and Urban Affairs. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  19. Diagnostic values of different definitions of metabolic syndrome to detect poor health status in Iranian adults without diabetes.

    PubMed

    Amiri, P; Deihim, T; Hosseinpanah, F; Barzin, M; Hasheminia, M; Montazeri, A; Azizi, F

    2014-07-01

    This study aimed to compare the diagnostic impact of four definitions of the metabolic syndrome for detection of poor health status in adults without diabetes living in Tehran. A representative sample of 950 individuals (64% women), aged ≥ 20 years, participants of the Tehran Lipid and Glucose Study in 2005-2007, were recruited for the study. Health status was assessed using the Iranian version of the 36-item Short Form Health Survey. We assessed the detectability of poor health status by definitions of the National Cholesterol Education Program Adult Treatment Panel III, the International Diabetes Federation, the American Heart Association/National Heart, Lung, and the Blood Institute and the Joint Interim Statement. Compared with other definitions, the Joint Interim Statement identified more participants (46.9%) having the metabolic syndrome. Using the National Cholesterol Education Program Adult Treatment Panel III, the International Diabetes Federation and the Joint Interim Statement, the metabolic syndrome was significantly related to poor physical health status, even after adjustment for confounding variables, in women, but not in men. None of the four definitions of the metabolic syndrome was related to the mental health status in either gender. The receiver operating characteristic curves showed no significant difference in the discriminative power of the metabolic syndrome definitions in detecting poor health status in either gender. However, women showed a higher area under the curve for all definitions, in comparison with men. There was no difference in the four different definitions of the metabolic syndrome in detecting poor health status among Iranian adults. © 2014 The Authors. Diabetic Medicine © 2014 Diabetes UK.

  20. Preventive maintenance study : interim report.

    DOT National Transportation Integrated Search

    2017-09-01

    This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...

  1. 75 FR 5499 - Claims for Compensation; Death Gratuity Under the Federal Employees' Compensation Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... for Compensation; Death Gratuity Under the Federal Employees' Compensation Act AGENCY: Office of... Labor (DOL) published an interim final rule in order to administer the death gratuity created by section... provides a death gratuity payment to eligible survivors of federal employees and non-appropriated fund...

  2. Health information technology: initial set of standards, implementation specifications, and certification criteria for electronic health record technology. Interim final rule.

    PubMed

    2010-01-13

    The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.

  3. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...

  4. SWSA 6 interim corrective measures environmental monitoring: FY 1991 results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clapp, R.B.; Marshall, D.S.

    1992-06-01

    In 1988, interim corrective measures (ICMs) were implemented at Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory. The SWSA 6 site was regulated under the Resource Conservation and Recovery Act (RCRA). The ICMs consist of eight large high-density polyethylene sheets placed as temporary caps to cover trenches known to contain RCRA-regulated materials. Environmental monitoring for FY 1991 consisted of collecting water levels at 13 groundwater wells outside the capped areas and 44 wells in or near the capped areas in order to identify any significant loss of hydrologic isolation of the wastes. Past annual reports show thatmore » the caps are only partially effective in keeping the waste trenches dry and that many trenches consistently or intermittently contain water.« less

  5. 12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...

  6. 8 CFR 1245.8 - Adjustment of status as a special immigrant under section 101(a)(27)(K) of the Act.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Adjustment of status as a special immigrant... PERSON ADMITTED FOR PERMANENT RESIDENCE § 1245.8 Adjustment of status as a special immigrant under... special immigrant under section 101(a)(27)(K) of the Act must file a Form I-485, Application to Register...

  7. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...

  8. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...

  9. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...

  10. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  11. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  12. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  13. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  14. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  15. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  16. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  17. EPA issues interim final waste minimization guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bergeson, L.L.

    1993-08-01

    The U.S. Environmental Protection Agency (EPA) has released a new and detailed interim final guidance to assist hazardous waste generators in certifying they have a waste minimization program in place under the Resource Conservation and Recovery Act (RCRA). EPA's guidance identifies the basic elements of a waste minimization program in place that, if present, will allow people to certify they have implemented a program to reduce the volume and toxicity of hazardous waste to the extent economically practical. The guidance is directly applicable to generators of 1000 or more kilograms per month of hazardous waste, or large-quantity generators, and tomore » owners and operators of hazardous waste treatment, storage or disposal facilities who manage their own hazardous waste on site. Small-quantity generators that generate more than 100 kilograms, but less than 1,000 kilograms, per month of hazardous waste are not subject to the same program in place certification requirement. Rather, they must certify on their manifests that they have made a good faith effort to minimize their waste generation.« less

  18. Lessons for outsourcing and interim management relationships.

    PubMed

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  19. Interim Report by Asia International Grid Connection Study Group

    NASA Astrophysics Data System (ADS)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  20. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri. [Hazelwood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  1. Incorporating population viability models into species status assessment and listing decisions under the U.S. Endangered Species Act

    USGS Publications Warehouse

    McGowan, Conor P.; Allan, Nathan; Servoss, Jeff; Hedwall, Shaula J.; Wooldridge, Brian

    2017-01-01

    Assessment of a species' status is a key part of management decision making for endangered and threatened species under the U.S. Endangered Species Act. Predicting the future state of the species is an essential part of species status assessment, and projection models can play an important role in developing predictions. We built a stochastic simulation model that incorporated parametric and environmental uncertainty to predict the probable future status of the Sonoran desert tortoise in the southwestern United States and North Central Mexico. Sonoran desert tortoise was a Candidate species for listing under the Endangered Species Act, and decision makers wanted to use model predictions in their decision making process. The model accounted for future habitat loss and possible effects of climate change induced droughts to predict future population growth rates, abundances, and quasi-extinction probabilities. Our model predicts that the population will likely decline over the next few decades, but there is very low probability of quasi-extinction less than 75 years into the future. Increases in drought frequency and intensity may increase extinction risk for the species. Our model helped decision makers predict and characterize uncertainty about the future status of the species in their listing decision. We incorporated complex ecological processes (e.g., climate change effects on tortoises) in transparent and explicit ways tailored to support decision making processes related to endangered species.

  2. 78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...

  3. Health Resources Priority and Allocations System (HRPAS). Interim final rule.

    PubMed

    2015-07-17

    This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations.

  4. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MAY TH

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revisionmore » includes information on additional feed tanks.« less

  5. 22 CFR 127.8 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... world peace or the security or foreign policy of the United States. The interim suspension orders... Trade Controls will issue an appropriate order disposing of the motion or petition and will promptly...

  6. 76 FR 67361 - Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... DEPARTMENT OF STATE 22 CFR Part 42 [Public Notice 7391] RIN 1400-AC86 Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended AGENCY: State Department. ACTION: Interim final rule. SUMMARY: This rule amends the Department of State's regulations relating to adoptions in...

  7. A web-based endpoint adjudication system for interim analyses in clinical trials.

    PubMed

    Nolen, Tracy L; Dimmick, Bill F; Ostrosky-Zeichner, Luis; Kendrick, Amy S; Sable, Carole; Ngai, Angela; Wallace, Dennis

    2009-02-01

    A data monitoring committee (DMC) is often employed to assess trial progress and review safety data and efficacy endpoints throughout a trail. Interim analyses performed for the DMC should use data that are as complete and verified as possible. Such analyses are complicated when data verification involves subjective study endpoints or requires clinical expertise to determine each subject's status with respect to the study endpoint. Therefore, procedures are needed to obtain adjudicated data for interim analyses in an efficient manner. In the past, methods for handling such data included using locally reported results as surrogate endpoints, adjusting analysis methods for unadjudicated data, or simply performing the adjudication as rapidly as possible. These methods all have inadequacies that make their sole usage suboptimal. For a study of prophylaxis for invasive candidiasis, adjudication of both study eligibility criteria and clinical endpoints prior to two interim analyses was required. Because the study was expected to enroll at a moderate rate and the sponsor required adjudicated endpoints to be used for interim analyses, an efficient process for adjudication was required. We created a web-based endpoint adjudication system (WebEAS) that allows for expedited review by the endpoint adjudication committee (EAC). This system automatically identifies when a subject's data are complete, creates a subject profile from the study data, and assigns EAC reviewers. The reviewers use the WebEAS to review the subject profile and submit their completed review form. The WebEAS then compares the reviews, assigns an additional review as a tiebreaker if needed, and stores the adjudicated data. The study for which this system was originally built was administratively closed after 10 months with only 38 subjects enrolled. The adjudication process was finalized and the WebEAS system activated prior to study closure. Some website accessibility issues presented initially. However

  8. Commentary: Interim leadership of academic departments at U.S. medical schools.

    PubMed

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  9. Interim Open Source Software (OSS) Policy

    EPA Pesticide Factsheets

    This interim Policy establishes a framework to implement the requirements of the Office of Management and Budget's (OMB) Federal Source Code Policy to achieve efficiency, transparency and innovation through reusable and open source software.

  10. FY17 Status Report: Research on Stress Corrosion Cracking of SNF Interim Storage Canisters.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schindelholz, Eric John; Bryan, Charles R.; Alexander, Christopher L.

    This progress report describes work done in FY17 at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. Work in FY17 refined our understanding of the chemical and physical environment on canister surfaces, and evaluated the relationship between chemical and physical environment and the form and extent of corrosion that occurs. The SNL corrosionmore » work focused predominantly on pitting corrosion, a necessary precursor for SCC, and process of pit-to-crack transition; it has been carried out in collaboration with university partners. SNL is collaborating with several university partners to investigate SCC crack growth experimentally, providing guidance for design and interpretation of experiments.« less

  11. Racial and Ethnic Health Disparities and the Affordable Care Act: a Status Update

    PubMed Central

    Sealy-Jefferson, Shawnita; Vickers, Jasmine; Elam, Angela; Wilson, M. Roy

    2015-01-01

    Persistent racial and ethnic health disparities exist in the USA, despite decades of research and public health initiatives. Several factors contribute to health disparities, including (but not limited to) implicit provider bias, access to health care, social determinants, and biological factors. Disparities in health by race/ethnicity are unacceptable and correctable. The Patient Protection and Affordable Care Act is a comprehensive legislation that is focused on improving health care access, quality, and cost control. This health care reform includes specific provisions which focus on preventive care, the standardized collection of data on race, ethnicity, primary language and disability status, and health information technology. Although some provisions of the Patient Protection and Affordable Care Act have not been implemented, such as funding for the U.S. Public Health Sciences track, which would have addressed the shortage of medical professionals in the USA who are trained to use patient-centered, interdisciplinary, and care coordination approaches, this legislation is still poised to make great strides toward eliminating health disparities. The purpose of this manuscript is to highlight the unprecedented opportunities that exist for the Patient Protection and Affordable Care Act to reduce racial and ethnic disparities in health in the USA. PMID:26668787

  12. 9 CFR 92.4 - Reestablishment of a region's disease-free status.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Reestablishment of a region's disease... Reestablishment of a region's disease-free status. This section applies to regions that are designated under this subchapter as free of a specific animal disease and then experience an outbreak of that disease. (a) Interim...

  13. 9 CFR 92.4 - Reestablishment of a region's disease-free status.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Reestablishment of a region's disease... Requesting Recognition of Regions Other Than for BSE § 92.4 Reestablishment of a region's disease-free status... disease and then experience an outbreak of that disease. (a) Interim designation. If a region recognized...

  14. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  15. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  16. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  17. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  18. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  19. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  20. 76 FR 78150 - Procedures for the Handling of Retaliation Complaints Under Section 806 of the Sarbanes-Oxley Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... of the Sarbanes-Oxley Act of 2002, as Amended; Correction AGENCY: Occupational Safety and Health Administration, Labor. ACTION: Interim final rule; correction. SUMMARY: The Occupational Safety and Health... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1980 [Docket Number...

  1. ACTS data center

    NASA Technical Reports Server (NTRS)

    Syed, Ali; Vogel, Wolfhard J.

    1993-01-01

    Viewgraphs on ACTS Data Center status report are included. Topics covered include: ACTS Data Center Functions; data flow overview; PPD flow; RAW data flow; data compression; PPD distribution; RAW Data Archival; PPD Audit; and data analysis.

  2. Pakistani Temporary Protected Status Act of 2010

    THOMAS, 111th Congress

    Rep. Green, Al [D-TX-9

    2010-12-08

    House - 12/20/2010 Referred to the Subcommittee on Immigration, Citizenship, Refugees, Border Security, and International Law. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  3. 78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...

  4. A Non-Traditional Interim Project.

    ERIC Educational Resources Information Center

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  5. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  6. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...

  7. Hiring Incentives to Restore Employment Act

    THOMAS, 111th Congress

    Rep. Mollohan, Alan B. [D-WV-1

    2009-06-12

    03/18/2010 Became Public Law No: 111-147. (TXT | PDF) (All Actions) Notes: Pursuant to H.Res. 976, the House modified the Commerce-Justice-Science Appropriations Act, 2010, H.R. 2847, substituting the "Jobs for Main Street Act, 2010" as Division A of the Act and the "Statutory Pay-As-You-Go Act of 2009" as Division B. (Regular appropriations for FY2010 for... Tracker: This bill has the status Became LawHere are the steps for Status of Legislation:

  8. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    PubMed

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (P<.001). At the facial margin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (P<.001). However, the mean percentage dye penetration was significantly correlated with the vertical and horizontal marginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns

  9. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (ii) Improvement in water quality; including: (A) Total phosphorus concentrations in the Everglades...) Increases in total spatial extent of restored wetlands; (B) Improvement in habitat quality; and (C... implementation process. In addition, interim goals will facilitate adaptive management and allow the Corps of...

  10. The utility of Bayesian predictive probabilities for interim monitoring of clinical trials

    PubMed Central

    Connor, Jason T.; Ayers, Gregory D; Alvarez, JoAnn

    2014-01-01

    Background Bayesian predictive probabilities can be used for interim monitoring of clinical trials to estimate the probability of observing a statistically significant treatment effect if the trial were to continue to its predefined maximum sample size. Purpose We explore settings in which Bayesian predictive probabilities are advantageous for interim monitoring compared to Bayesian posterior probabilities, p-values, conditional power, or group sequential methods. Results For interim analyses that address prediction hypotheses, such as futility monitoring and efficacy monitoring with lagged outcomes, only predictive probabilities properly account for the amount of data remaining to be observed in a clinical trial and have the flexibility to incorporate additional information via auxiliary variables. Limitations Computational burdens limit the feasibility of predictive probabilities in many clinical trial settings. The specification of prior distributions brings additional challenges for regulatory approval. Conclusions The use of Bayesian predictive probabilities enables the choice of logical interim stopping rules that closely align with the clinical decision making process. PMID:24872363

  11. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    EPA Science Inventory

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  12. 40 CFR 94.12 - Interim provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions that apply...

  13. 40 CFR 94.12 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...

  14. 40 CFR 94.12 - Interim provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...

  15. 40 CFR 94.12 - Interim provisions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...

  16. 40 CFR 94.12 - Interim provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...

  17. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient

    PubMed Central

    Bettie, Nirmal Famila

    2017-01-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report. PMID:29284985

  18. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    PubMed

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  19. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  20. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  1. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  2. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  3. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  4. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  5. Interim Policy for Evaluation of Stereoisomeric Pesticides

    EPA Pesticide Factsheets

    An interim approach for determining data requirements for non-racemic mixtures of stereoisomeric pesticides. These data are needed in order to assess the risk posed to ecosystems and drinking water sources by these mixtures.

  6. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent frommore » buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.« less

  7. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  8. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  9. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  10. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...

  11. Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.

    PubMed

    Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay

    2018-04-17

    In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  12. Predicting clinical trial results based on announcements of interim analyses

    PubMed Central

    2014-01-01

    Background Announcements of interim analyses of a clinical trial convey information about the results beyond the trial’s Data Safety Monitoring Board (DSMB). The amount of information conveyed may be minimal, but the fact that none of the trial’s stopping boundaries has been crossed implies that the experimental therapy is neither extremely effective nor hopeless. Predicting success of the ongoing trial is of interest to the trial’s sponsor, the medical community, pharmaceutical companies, and investors. We determine the probability of trial success by quantifying only the publicly available information from interim analyses of an ongoing trial. We illustrate our method in the context of the National Surgical Adjuvant Breast and Bowel (NSABP) trial, C-08. Methods We simulated trials based on the specifics of the NSABP C-08 protocol that were publicly available. We quantified the uncertainty around the treatment effect using prior weights for the various possibilities in light of other colon cancer studies and other studies of the investigational agent, bevacizumab. We considered alternative prior distributions. Results Subsequent to the trial’s third interim analysis, our predictive probabilities were: that the trial would eventually be successful, 48.0%; would stop for futility, 7.4%; and would continue to completion without statistical significance, 44.5%. The actual trial continued to completion without statistical significance. Conclusions Announcements of interim analyses provide information outside the DSMB’s sphere of confidentiality. This information is potentially helpful to clinical trial prognosticators. ‘Information leakage’ from standard interim analyses such as in NSABP C-08 is conventionally viewed as acceptable even though it may be quite revealing. Whether leakage from more aggressive types of adaptations is acceptable should be assessed at the design stage. PMID:24607270

  13. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  14. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM SUBSIDIZED...

  15. 75 FR 37187 - Patient Protection and Affordable Care Act: Preexisting Condition Exclusions, Lifetime and Annual...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... 147.108) generally apply for plan years beginning on or after January 1, 2014, except that in the case... the case of enrollees who are under 19 years of age, these interim final regulations under PHS Act... to the Department of Labor, identified by RIN 1210-AB43, by one of the following methods: Federal e...

  16. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  17. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  18. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  19. 19 CFR 354.8 - Interim sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  20. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  1. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  2. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  3. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  4. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  5. SWSA 6 interim corrective measures environmental monitoring: FY 1991 results. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clapp, R.B.; Marshall, D.S.

    1992-06-01

    In 1988, interim corrective measures (ICMs) were implemented at Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory. The SWSA 6 site was regulated under the Resource Conservation and Recovery Act (RCRA). The ICMs consist of eight large high-density polyethylene sheets placed as temporary caps to cover trenches known to contain RCRA-regulated materials. Environmental monitoring for FY 1991 consisted of collecting water levels at 13 groundwater wells outside the capped areas and 44 wells in or near the capped areas in order to identify any significant loss of hydrologic isolation of the wastes. Past annual reports show thatmore » the caps are only partially effective in keeping the waste trenches dry and that many trenches consistently or intermittently contain water.« less

  6. Diversified Satellite Occupations Program. Interim Report.

    ERIC Educational Resources Information Center

    Call, John Reed

    This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…

  7. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification activities...

  8. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    PubMed

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P<.001). In the axial regions, even though the mean discrepancy was smallest in the molding group, the data showed large deviations. In the occlusal region, the polymer-jetting group was the most accurate, and compared with the other groups, the milling group showed larger internal discrepancies (P<.001). Polymer-jet 3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  9. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Retired Reserve for members of the Retired Reserve. Interim final rule with comment period.

    PubMed

    2010-08-06

    This interim final rule establishes requirements and procedures for implementation of TRICARE Retired Reserve. This interim final rule addresses provisions of the National Defense Authorization Act for Fiscal Year 2010 (NDAA-10). The purpose of this interim final rule is to establish the TRICARE Retired Reserve program that implements section 705 of the NDAA-10. Section 705 allows members of the Retired Reserve who are qualified for non-regular retirement, but are not yet 60 years of age, to qualify to purchase medical coverage equivalent to the TRICARE Standard (and Extra) benefit unless that member is either enrolled in, or is eligible to enroll in, a health benefit plan under Chapter 89 of Title 5, United States Code, as well as certain survivors. The amount of the premium that qualified members pay to purchase these benefits will represent the full cost as determined on an appropriate actuarial basis for coverage under the TRICARE Standard (and Extra) benefit including the cost of the program administration. There will be one premium for member-only coverage and a separate premium for member and family coverage. The rules and procedures otherwise outlined in Part 199 of 32 CFR relating to the operation and administration of the TRICARE Standard and Extra programs including the required cost-shares, deductibles and catastrophic caps for retired members and their dependents will apply to this program. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.

  10. 40 CFR 1036.150 - Interim provisions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Interim provisions. 1036.150 Section... 13 CFR 121.201 are not subject to the greenhouse gas emission standards in § 1036.108. Qualifying... small business under 13 CFR 121.201. You must label your excluded vehicles with the statement: “THIS...

  11. 40 CFR 1036.150 - Interim provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Interim provisions. 1036.150 Section... 13 CFR 121.201 are not subject to the greenhouse gas emission standards in § 1036.108. Qualifying... small business under 13 CFR 121.201. You must label your excluded engines with the statement: “THIS...

  12. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  13. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  14. A global validation of ERA-Interim integrated water vapor estimates using ground-based GNSS observations

    NASA Astrophysics Data System (ADS)

    Ahmed, F.; Dousa, J.; Hunegnaw, A.; Teferle, F. N.; Bingley, R.

    2017-12-01

    Integrated water vapor (IWV) derived from climate reanalysis models, such as the European Centre for Medium-range Weather Forecasts (ECMWF) ReAnalysis-Interim (ERA-Interim), is widely used in many atmospheric applications. Therefore, it is of interest to assess the quality of this reanalysis product using available observations. Observations from Global Navigation Satellite Systems (GNSS) are, as of now, available for a period of over 2 decades and their global availability makes it possible to validate the IWV obtained from climate reanalysis models in different geographical and climatic regions. In this study, primarily, three 5-year long homogeneously reprocessed GNSS-derived IWV datasets containing over 400 globally distributed ground-based GNSS stations have been used to validate the IWV estimates obtained from the ERA-Interim climate reanalysis model in 25 different climate zones. The IWV from ERA-Interim has been obtained by vertically integrating the specific humidity at all model levels above the locations of GNSS stations. It has been studied how the difference between the ERA-Interim IWV and the GNSS-derived IWV varies with respect to the different climate zones as well as with respect to the difference in the model orography and latitude. The results show a dependence of the ability of ERA-Interim to model the IWV on difference in climate types and latitude. This dependence, however, is dictated by the concentration of water vapor in different climate zones and at different latitudes. Furthermore, as a secondary focus of this study, the weighted mean atmospheric temperature (Tm) obtained from ERA-Interim has been compared to its equivalent obtained using two widely used approximations globally.

  15. An interim prosthesis program for lower limb amputees: comparison of public and private models of service.

    PubMed

    Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn

    2010-06-01

    This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.

  16. 24 CFR 115.203 - Interim certification procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim certification procedures. 115.203 Section 115.203 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  17. 24 CFR 115.203 - Interim certification procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Interim certification procedures. 115.203 Section 115.203 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  18. 24 CFR 115.203 - Interim certification procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Interim certification procedures. 115.203 Section 115.203 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  19. 24 CFR 115.203 - Interim certification procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim certification procedures. 115.203 Section 115.203 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  20. 24 CFR 115.203 - Interim certification procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Interim certification procedures. 115.203 Section 115.203 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  1. Interim Guidance: Municipal Solid Waste Exemption under Superfund

    EPA Pesticide Factsheets

    Interim guidance discusses the statutory provisions of CERCLA § 107(p) and identifies some factors to be considered by EPA and DOJ staff in exercising their enforcement discretion of MSW at an NPL site.

  2. Status report on speech research. A report on the status and progress of studies on the nature of speech, instrumentation for its investigation, and practical applications

    NASA Astrophysics Data System (ADS)

    Liberman, A. M.

    1985-10-01

    This interim status report on speech research discusses the following topics: On Vagueness and Fictions as Cornerstones of a Theory of Perceiving and Acting: A Comment on Walter (1983); The Informational Support for Upright Stance; Determining the Extent of Coarticulation-effects of Experimental Design; The Roles of Phoneme Frequency, Similarity, and Availability in the Experimental Elicitation of Speech Errors; On Learning to Speak; The Motor Theory of Speech Perception Revised; Linguistic and Acoustic Correlates of the Perceptual Structure Found in an Individual Differences Scaling Study of Vowels; Perceptual Coherence of Speech: Stability of Silence-cued Stop Consonants; Development of the Speech Perceptuomotor System; Dependence of Reading on Orthography-Investigations in Serbo-Croatian; The Relationship between Knowledge of Derivational Morphology and Spelling Ability in Fourth, Sixth, and Eighth Graders; Relations among Regular and Irregular, Morphologically-Related Words in the Lexicon as Revealed by Repetition Priming; Grammatical Priming of Inflected Nouns by the Gender of Possessive Adjectives; Grammatical Priming of Inflected Nouns by Inflected Adjectives; Deaf Signers and Serial Recall in the Visual Modality-Memory for Signs, Fingerspelling, and Print; Did Orthographies Evolve?; The Development of Children's Sensitivity to Factors Inf luencing Vowel Reading.

  3. Group health plans and health insurance issuers relating to coverage of preventive services under the Patient Protection and Affordable Care Act. Final rules.

    PubMed

    2012-02-15

    These regulations finalize, without change, interim final regulations authorizing the exemption of group health plans and group health insurance coverage sponsored by certain religious employers from having to cover certain preventive health services under provisions of the Patient Protection and Affordable Care Act.

  4. Interim report : a non-overlay cathodic protection system.

    DOT National Transportation Integrated Search

    1983-01-01

    This interim report describes Virginia's experience in installing its first cathodic protection system for a bridge deck. The installation was completed with practically no problems. Very minor problems have been encountered with the rectifier/contro...

  5. Patient Protection and Affordable Care Act; program integrity: exchange, premium stabilization programs, and market standards; amendments to the HHS notice of benefit and payment parameters for 2014. Final rule.

    PubMed

    2013-10-30

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act). Specifically, this final rule outlines financial integrity and oversight standards with respect to Affordable Insurance Exchanges, qualified health plan (QHP) issuers in Federally-facilitated Exchanges (FFEs), and States with regard to the operation of risk adjustment and reinsurance programs. It also establishes additional standards for special enrollment periods, survey vendors that may conduct enrollee satisfaction surveys on behalf of QHP issuers, and issuer participation in an FFE, and makes certain amendments to definitions and standards related to the market reform rules. These standards, which include financial integrity provisions and protections against fraud and abuse, are consistent with Title I of the Affordable Care Act. This final rule also amends and adopts as final interim provisions set forth in the Amendments to the HHS Notice of Benefit and Payment Parameters for 2014 interim final rule, published in the Federal Register on March 11, 2013, related to risk corridors and cost-sharing reduction reconciliation.

  6. Modifications to the HIPAA Privacy, Security, Enforcement, and Breach Notification rules under the Health Information Technology for Economic and Clinical Health Act and the Genetic Information Nondiscrimination Act; other modifications to the HIPAA rules.

    PubMed

    2013-01-25

    The Department of Health and Human Services (HHS or ``the Department'') is issuing this final rule to: Modify the Health Insurance Portability and Accountability Act (HIPAA) Privacy, Security, and Enforcement Rules to implement statutory amendments under the Health Information Technology for Economic and Clinical Health Act (``the HITECH Act'' or ``the Act'') to strengthen the privacy and security protection for individuals' health information; modify the rule for Breach Notification for Unsecured Protected Health Information (Breach Notification Rule) under the HITECH Act to address public comment received on the interim final rule; modify the HIPAA Privacy Rule to strengthen the privacy protections for genetic information by implementing section 105 of Title I of the Genetic Information Nondiscrimination Act of 2008 (GINA); and make certain other modifications to the HIPAA Privacy, Security, Breach Notification, and Enforcement Rules (the HIPAA Rules) to improve their workability and effectiveness and to increase flexibility for and decrease burden on the regulated entities.

  7. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  8. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  9. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  10. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  11. An Act to extend expiring provisions of the USA PATRIOT Improvement and Reauthorization Act of 2005 and Intelligence Reform and Terrorism Prevention Act of 2004 until February 28, 2011.

    THOMAS, 111th Congress

    Rep. Dingell, John D. [D-MI-15

    2009-10-29

    02/27/2010 Became Public Law No: 111-141. (TXT | PDF) (All Actions) Notes: Title on passage: To extend expiring provisions of the USA PATRIOT Improvement and Reauthorization Act of 2005 and Intelligence Reform and Terrorism Prevention Act of 2004 until February 28, 2011. Tracker: This bill has the status Became LawHere are the steps for Status of Legislation:

  12. Intelligent cruise control field operational test : interim report

    DOT National Transportation Integrated Search

    1997-03-01

    This interim document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The overarching goal of the work is to characterize safety and comfort issues that are fundamenta...

  13. School Health Program. Interim Guide. Grade 9.

    ERIC Educational Resources Information Center

    Northwest Territories Dept. of Education, Yellowknife.

    This interim guide, a component of the Northwest Territories (Canada) School Health Program, includes instructional strategies, lesson plans, reproducibles, and teacher background materials for ninth grade classes. The material is organized around the three curriculum units: (1) the mental and emotional well-being unit which has three lessons on…

  14. Interim Guidelines Growing Longleaf Seedlings in Containers

    Treesearch

    James P. Barnett; Mark J. Hainds; George A. Hernandez

    2002-01-01

    These interim guidelines are designed for producers and users of longleaf pine container stock. They are not meant to exclude any container product. The seedling specifications listed in the preferred category are attainable by the grower and will result in excellent field sur vival and early height growth.

  15. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.41 Interim operating... terminate 180 days after the date on which an air tour management plan is established for the park and tribal lands; (6) Shall promote protection of national park resources, visitor experiences, and tribal...

  16. 76 FR 37781 - Foreign-Trade Zone 26; Atlanta, GA; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...

  17. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...

  18. FY2017 Defense Spending Under an Interim Continuing Resolution (CR): In Brief

    DTIC Science & Technology

    2016-09-16

    rated based on the fraction of a year for which the interim CR is in effect . In recent fiscal years, the referenced funding level on which interim or...of the Federal Government: Causes, Processes, and Effects , coordinated by Clinton T. Brass. 8 Typically, such funding is specified as an annualized...congressional consideration of a CR to fund the federal government through the opening months of the fiscal year is widely anticipated. This report

  19. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  20. Biocides for the Battlefield - Interim Report

    DTIC Science & Technology

    2010-09-24

    for public release; distribution is unlimited. James H . Wynne Materials Chemistry Branch Chemistry Division Preston a. Fulmer Chemical Dynamics and...b. ABSTRACT c. THIS PAGE 18. NUMBER OF PAGES 17. LIMITATION OF ABSTRACT Biocides for the Battlefield—Interim Report James H . Wynne and Preston A...distribution is unlimited. Unclassified Unclassified Unclassified SAR 25 James H . Wynne (202) 404-4010 The ability to disinfect surfaces and manufacture self

  1. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    EPA Pesticide Factsheets

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  2. Temps at the Top: Factors Related to the Appointment of Interim Community College Presidents

    ERIC Educational Resources Information Center

    Goff, Susan L.

    2012-01-01

    The appointment of interim community college presidents, the topic of this study, is a little understood phenomenon. A growing shortage of community college presidents coupled with a lack of replacements suggests the appointment of interims will continue well into the future. This study, with a purpose of looking at the factors related to the…

  3. Interim Service ISDN Satellite (ISIS) simulator development for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1992-01-01

    The simulation development associated with the network models of both the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and the Full Service ISDN Satellite (FSIS) architectures is documented. The ISIS Network Model design represents satellite systems like the Advanced Communications Technology Satellite (ACTS) orbiting switch. The FSIS architecture, the ultimate aim of this element of the Satellite Communications Applications Research (SCAR) Program, moves all control and switching functions on-board the next generation ISDN communications satellite. The technical and operational parameters for the advanced ISDN communications satellite design will be obtained from the simulation of ISIS and FSIS engineering software models for their major subsystems. Discrete event simulation experiments will be performed with these models using various traffic scenarios, design parameters, and operational procedures. The data from these simulations will be used to determine the engineering parameters for the advanced ISDN communications satellite.

  4. 76 FR 43260 - Foreign-Trade Zone 72-Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...

  5. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...

  6. Alaska Interim Land Cover Mapping Program; final report

    USGS Publications Warehouse

    Fitzpatrick-Lins, Katherine; Doughty, E.F.; Shasby, Mark; Benjamin, Susan

    1989-01-01

    In 1985, the U.S. Geological Survey initiated a research project to develop an interim land cover data base for Alaska as an alternative to the nationwide Land Use and Land Cover Mapping Program. The Alaska Interim Land Cover Mapping Program was subsequently created to develop methods for producing a series of land cover maps that utilized the existing Landsat digital land cover classifications produced by and for the major land management agencies for mapping the vegetation of Alaska. The program was successful in producing digital land cover classifications and statistical summaries using a common statewide classification and in reformatting these data to produce l:250,000-scale quadrangle-based maps directly from the Scitex laser plotter. A Federal and State agency review of these products found considerable user support for the maps. Presently the Geological Survey is committed to digital processing of six to eight quadrangles each year.

  7. The Homestake Interim Laboratory and Homestake DUSEL

    NASA Astrophysics Data System (ADS)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  8. 78 FR 53038 - Interim Final Determination to Stay and Defer Sanctions; California; San Joaquin Valley

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0534; FRL-9900-36-Region 9.... Environmental Protection Agency (EPA). ACTION: Interim final rule. SUMMARY: EPA is making an interim [email protected] . Mail or deliver: Frances Wicher (AIR-2), U.S. Environmental Protection Agency Region 9...

  9. Evaluation of ERA-interim and MERRA Cloudiness in the Southern Oceans

    NASA Technical Reports Server (NTRS)

    Naud, Catherine M.; Booth, James F.; Del Genio, Anthony D.

    2014-01-01

    The Southern Ocean cloud cover modeled by the Interim ECMWF Re-Analysis (ERA-Interim) and Modern- Era Retrospective Analysis for Research and Applications (MERRA) reanalyses are compared against Moderate Resolution Imaging Spectroradiometer (MODIS) and Multiangle Imaging Spectroradiometer (MISR) observations. ERA-Interim monthly mean cloud amounts match the observations within 5%, while MERRA significantly underestimates the cloud amount. For a compositing analysis of clouds in warm season extratropical cyclones, both reanalyses show a low bias in cloud cover. They display a larger bias to the west of the cyclones in the region of subsidence behind the cold fronts. This low bias is larger for MERRA than for ERA-Interim. Both MODIS and MISR retrievals indicate that the clouds in this sector are at a low altitude, often composed of liquid, and of a broken nature. The combined CloudSat-Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) cloud profiles confirm these passive observations, but they also reveal that low-level clouds in other parts of the cyclones are also not properly represented in the reanalyses. The two reanalyses are in fairly good agreement for the dynamic and thermodynamic characteristics of the cyclones, suggesting that the cloud, convection, or boundary layer schemes are the problem instead. An examination of the lower-tropospheric stability distribution in the cyclones from both reanalyses suggests that the parameterization of shallow cumulus clouds may contribute in a large part to the problem. However, the differences in the cloud schemes and in particular in the precipitation processes, which may also contribute, cannot be excluded.

  10. Using ERA-Interim reanalysis for creating datasets of energy-relevant climate variables

    NASA Astrophysics Data System (ADS)

    Jones, Philip D.; Harpham, Colin; Troccoli, Alberto; Gschwind, Benoit; Ranchin, Thierry; Wald, Lucien; Goodess, Clare M.; Dorling, Stephen

    2017-07-01

    The construction of a bias-adjusted dataset of climate variables at the near surface using ERA-Interim reanalysis is presented. A number of different, variable-dependent, bias-adjustment approaches have been proposed. Here we modify the parameters of different distributions (depending on the variable), adjusting ERA-Interim based on gridded station or direct station observations. The variables are air temperature, dewpoint temperature, precipitation (daily only), solar radiation, wind speed, and relative humidity. These are available on either 3 or 6 h timescales over the period 1979-2016. The resulting bias-adjusted dataset is available through the Climate Data Store (CDS) of the Copernicus Climate Change Data Store (C3S) and can be accessed at present from ftp://ecem.climate.copernicus.eu. The benefit of performing bias adjustment is demonstrated by comparing initial and bias-adjusted ERA-Interim data against gridded observational fields.

  11. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of.... We strongly urge you not to include in your comments any personal information, such as Social...

  12. 75 FR 12217 - Notice of Availability for Comments Regarding the Planned Environmental Assessment Interim Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... public comments for a planned Environmental Assessment. The Corps is directed to conduct a study of.... The study is structured as a series of interim reports. Interim Report IIIa, limited to the impacts of.... Comments are requested to assist in determining the level of analysis and impacts to be considered for...

  13. An allowable cladding peak temperature for spent nuclear fuels in interim dry storage

    NASA Astrophysics Data System (ADS)

    Cha, Hyun-Jin; Jang, Ki-Nam; Kim, Kyu-Tae

    2018-01-01

    Allowable cladding peak temperatures for spent fuel cladding integrity in interim dry storage were investigated, considering hydride reorientation and mechanical property degradation behaviors of unirradiated and neutron irradiated Zr-Nb cladding tubes. Cladding tube specimens were heated up to various temperatures and then cooled down under tensile hoop stresses. Cool-down specimens indicate that higher heat-up temperature and larger tensile hoop stress generated larger radial hydride precipitation and smaller tensile strength and plastic hoop strain. Unirradiated specimens generated relatively larger radial hydride precipitation and plastic strain than did neutron irradiated specimens. Assuming a minimum plastic strain requirement of 5% for cladding integrity maintenance in interim dry storage, it is proposed that a cladding peak temperature during the interim dry storage is to keep below 250 °C if cladding tubes are cooled down to room temperature.

  14. Prohibiting Detention of Youth Status Offenders Act of 2014

    THOMAS, 113th Congress

    Rep. Cardenas, Tony [D-CA-29

    2014-02-28

    House - 06/13/2014 Referred to the Subcommittee on Early Childhood, Elementary, and Secondary Education. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  15. Computerization of material test data reporting system : interim report.

    DOT National Transportation Integrated Search

    1973-09-01

    This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...

  16. Evaluation of the HOPE Act: New State Services for Street Youth. Interim Report.

    ERIC Educational Resources Information Center

    McLain, Barbara

    This report reviews the effectiveness of Washington's HOPE Centers and Responsible Living Skills Programs (RLSPs) and reports findings and recommendations. In 1999, state legislators enacted the HOPE Act, which created these two services. HOPE Centers are temporary residential facilities where street youth can stay for 30 days while being…

  17. 24 CFR 115.202 - Request for interim certification.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Request for interim certification. 115.202 Section 115.202 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  18. 24 CFR 115.202 - Request for interim certification.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Request for interim certification. 115.202 Section 115.202 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  19. 24 CFR 115.202 - Request for interim certification.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Request for interim certification. 115.202 Section 115.202 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  20. 24 CFR 115.202 - Request for interim certification.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Request for interim certification. 115.202 Section 115.202 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  1. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  2. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  3. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  4. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  5. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    PubMed

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  6. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoffmore » dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.« less

  7. Legislative Branch Appropriations Act, 2010

    THOMAS, 111th Congress

    Rep. Wasserman Schultz, Debbie [D-FL-20

    2009-06-17

    10/01/2009 Became Public Law No: 111-68. (TXT | PDF) (All Actions) Notes: Division A is the Legislative Branch Appropriations Act, 2010. Division B is the Continuing Appropriations Resolution, 2010. Tracker: This bill has the status Became LawHere are the steps for Status of Legislation:

  8. 75 FR 60436 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  9. 75 FR 24667 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  10. 75 FR 10476 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  11. 76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  12. 75 FR 15420 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...

  13. 76 FR 59119 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...

  14. SWSA 6 interim corrective measures environmental monitoring: FY 1990 results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwood, T.L.; Spalding, B.P.

    1991-07-01

    This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levelsmore » in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs.« less

  15. SLS INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE ARRIVAL

    NASA Image and Video Library

    2016-06-19

    SLS INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE ARRIVES AT WEST DOCK ON SHIELDS ROAD AND IS OFF LOADED FROM BARGEUAH ENGINEERING STUDENT ROBERT HILLAN TALKS TO SPACE STATION CREW MEMBERS ABOUT HIS WINNING 3-D PRINTED TOOL DESIGNED FOR USE ON ISS, AND IS INTERVIEWED BY LOCAL MEDIA

  16. Interim Assessment of the VAL Automated Guideway Transit System.

    DOT National Transportation Integrated Search

    1981-11-01

    This report describes an interim assessment of the VAL (Vehicules Automatiques Legers or Light Automated Vehicle) AGT system which is currently under construction in Lille, France, and which is to become fully operational in December 1983. This repor...

  17. FDA Food Safety Modernization Act

    THOMAS, 111th Congress

    Rep. Sutton, Betty [D-OH-13

    2009-06-08

    01/04/2011 Became Public Law No: 111-353. (TXT | PDF) (All Actions) Notes: H.R.2751 was introduced and first passed the House as the Consumer Assistance to Recycle and Save Act. Tracker: This bill has the status Became LawHere are the steps for Status of Legislation:

  18. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities operating over-the-road buses, in addition to compliance with other applicable provisions of this part...

  19. Planning and Designing School Computer Facilities. Interim Report.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Finance and Administration Div.

    This publication provides suggestions and considerations that may be useful for school jurisdictions developing facilities for computers in schools. An interim report for both use and review, it is intended to assist school system planners in clarifying the specifications needed by the architects, other design consultants, and purchasers involved.…

  20. "Intelligent" Computer Assisted Instruction (CAI) Applications. Interim Report.

    ERIC Educational Resources Information Center

    Brown, John Seely; And Others

    Interim work is documented describing efforts to modify computer techniques used to recognize and process English language requests to an instructional simulator. The conversion from a hand-coded to a table driven technique are described in detail. Other modifications to a simulation based computer assisted instruction program to allow a gaming…

  1. Marine Biochemistry: A New Interdisciplinary Course for the Interim

    ERIC Educational Resources Information Center

    Goldberg, Arthur S.

    1976-01-01

    Discusses an undergraduate course which includes lectures, laboratory, and field trips and is designed for the interim winter semester. The course is interdisciplinary, involving a study of the biochemistry, pharmacology, and physiological significance of compounds from marine flora and fauna. (MLH)

  2. An Interim Report on NASA's Draft Space Technology Roadmaps

    NASA Technical Reports Server (NTRS)

    2011-01-01

    NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13

  3. The Archaeology of Coralville Lake, Iowa. Volume 4. Recreation Area Survey. (Interim Report 2).

    DTIC Science & Technology

    1985-09-01

    THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA VOLUME IV: RECREATION AREA SURVEY (INTERIM REPORT II) p - [ JAN 1 4 1986 WAUWATOSA. WISCONSIN 86 1.13 117...THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA ; VOLUME IV: RECREATION AREA SURVEY (INTERIM REPORT II) Submitted To: Rock Island District Corps of Engineers...presents the results of intensive archaeological and geomorphic investigations at 14 special use or recreation areas at Coralville Lake, Iowa . The

  4. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  5. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma: interpretation criteria and concordance rate among reviewers.

    PubMed

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F

    2013-05-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The

  6. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  7. 77 FR 34399 - Public Housing Assessment System (PHAS): Capital Fund Interim Scoring Notice; Request for Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...-indicator of the Capital Fund indicator to all PHAs for the Capital Fund Indicator under the PHAS interim... transition to the scoring system implemented by the PHAS interim rule, especially as relates to the indicator that assesses occupancy rate. The 5 points for the occupancy sub-indicator will be awarded for fiscal...

  8. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  9. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  10. Approval of information collection requirements for the joint interim rules for health insurance portability for group health plans, and the individual market health insurance reform: portability from group to individual coverage; federal rules for access in the individual market; state alternative mechanisms to federal rules--IRS, DOL, HCFA. Interim rules with request for comments; approval of information collection requirements.

    PubMed

    1997-07-02

    On April 8, 1997, the Department of the Treasury, the Department of Labor, and the Department of Health and Human Services (Departments) published joint interim rules governing the access, portability and renewability requirements for group health plans and issuers offering group health insurance coverage in connection with a group health plan. The rules implemented changes made to certain provisions of the Internal Revenue Code of 1986 (Code), the Employee Retirement Income Security Act of 1974 (ERISA), and the Public Health Service Act (PHS Act) enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). In the April 8 publication, the Departments submitted the group market information collection requirements, for, among other things, establishing creditable coverage, notice of special enrollment rights, and notice of pre-existing condition exclusion periods, to be Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1995 (PRA 95). In addition, on April 8, 1997 the Department of Health and Human Services submitted the HIPAA individual market information collection requirements to OMB for emergency review under the PRA 1995. This document amends the April 8 Federal Register documents to properly display the OMB control numbers.

  11. INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE UNLOADED PRIOR T

    NASA Image and Video Library

    2016-06-20

    TWO CRANES LIFT THE APPROXIMATELY 8,000-POUND INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE OUT OF ITS CRATE AT MARSHALL. THE TEST ARTICLE ARRIVED AT MARSHALL SPACE FLIGHT CENTER VIA BARGE ON THE TENNESSEE RIVER AND WAS TRANSPORTED TO BUILDING 4649 WHERE TESTING WILL BEGIN.

  12. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...

  13. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-transtetrahydrocannabinol (delta-9-THC)] in Schedule II. Interim final rule, with request for comments.

    PubMed

    2017-03-23

    On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.

  14. Nonmanufacturing Businesses. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    Cornog, June R.; Bunten, Elaine D.

    In this fifth interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, a primary stratified sample of 2,828 nonmanufacturing firms was randomly selected from 28,184 businesses taken from Social Security files, a secondary sample of 2,258 firms was randomly selected for replacement…

  15. 75 FR 3443 - Sunshine Act Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... COMMISSION ON CIVIL RIGHTS Sunshine Act Notice AGENCY: United States Commission on Civil Rights... Recommendations for The Impact of Illegal Immigration on the Wages and Employment Opportunities of Black Workers Report. Update on Status of Title IX Project. Update on Status of 2010 Enforcement Report. III. State...

  16. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  17. 46 CFR 308.103 - Insured amounts under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 308.103 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.103 Insured amounts under interim binder. (a... chapter. (b) Insurance risks. Insurance risks covered by the terms of the standard form of war risk hull...

  18. 46 CFR 308.103 - Insured amounts under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 308.103 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.103 Insured amounts under interim binder. (a... chapter. (b) Insurance risks. Insurance risks covered by the terms of the standard form of war risk hull...

  19. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  20. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  1. 46 CFR 308.103 - Insured amounts under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 308.103 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.103 Insured amounts under interim binder. (a... chapter. (b) Insurance risks. Insurance risks covered by the terms of the standard form of war risk hull...

  2. 46 CFR 308.103 - Insured amounts under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 308.103 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.103 Insured amounts under interim binder. (a... the terms of the standard form of war risk hull insurance policy (§ 308.107), except damage to or...

  3. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  4. 46 CFR 308.103 - Insured amounts under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 308.103 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.103 Insured amounts under interim binder. (a... chapter. (b) Insurance risks. Insurance risks covered by the terms of the standard form of war risk hull...

  5. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  6. The Urban Consumer Education Project. Interim Report, 1979-80.

    ERIC Educational Resources Information Center

    Marshall, Gail; Haas, Kay

    This interim evaluation report of the St. Louis, Missouri Urban Consumer Education Project assesses program effectiveness in terms of teacher training and teacher knowledge of consumer basics, community resource participation, and student and teacher knowledge. The project was designed to teach fifth grade students their rights and…

  7. 7 CFR 1710.109 - Reimbursement of general funds and interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be limited, except in cases of extreme financial hardship as determined by the Administrator, to the...) Policies for reimbursement of general funds and interim financing following certain mergers, consolidations...

  8. Interim Basis for PCB Sampling and Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BANNING, D.L.

    2001-01-18

    This document was developed as an interim basis for sampling and analysis of polychlorinated biphenyls (PCBs) and will be used until a formal data quality objective (DQO) document is prepared and approved. On August 31, 2000, the Framework Agreement for Management of Polychlorinated Biphenyls (PCBs) in Hanford Tank Waste was signed by the US. Department of Energy (DOE), the Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) (Ecology et al. 2000). This agreement outlines the management of double shell tank (DST) waste as Toxic Substance Control Act (TSCA) PCB remediation waste based on a risk-based disposalmore » approval option per Title 40 of the Code of Federal Regulations 761.61 (c). The agreement calls for ''Quantification of PCBs in DSTs, single shell tanks (SSTs), and incoming waste to ensure that the vitrification plant and other ancillary facilities PCB waste acceptance limits and the requirements of the anticipated risk-based disposal approval are met.'' Waste samples will be analyzed for PCBs to satisfy this requirement. This document describes the DQO process undertaken to assure appropriate data will be collected to support management of PCBs and is presented in a DQO format. The DQO process was implemented in accordance with the U.S. Environmental Protection Agency EPA QAlG4, Guidance for the Data Quality Objectives Process (EPA 1994) and the Data Quality Objectives for Sampling and Analyses, HNF-IP-0842, Rev. 1 A, Vol. IV, Section 4.16 (Banning 1999).« less

  9. Interim Basis for PCB Sampling and Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BANNING, D.L.

    2001-03-20

    This document was developed as an interim basis for sampling and analysis of polychlorinated biphenyls (PCBs) and will be used until a formal data quality objective (DQO) document is prepared and approved. On August 31, 2000, the Framework Agreement for Management of Polychlorinated Biphenyls (PCBs) in Hanford Tank Waste was signed by the U.S. Department of Energy (DOE), the Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) (Ecology et al. 2000). This agreement outlines the management of double shell tank (DST) waste as Toxic Substance Control Act (TSCA) PCB remediation waste based on a risk-based disposalmore » approval option per Title 40 of the Code of Federal Regulations 761.61 (c). The agreement calls for ''Quantification of PCBs in DSTs, single shell tanks (SSTs), and incoming waste to ensure that the vitrification plant and other ancillary facilities PCB waste acceptance limits and the requirements of the anticipated risk-based disposal approval are met.'' Waste samples will be analyzed for PCBs to satisfy this requirement. This document describes the DQO process undertaken to assure appropriate data will be collected to support management of PCBs and is presented in a DQO format. The DQO process was implemented in accordance with the U.S. Environmental Protection Agency EPA QA/G4, Guidance for the Data Quality Objectives Process (EPA 1994) and the Data Quality Objectives for Sampling and Analyses, HNF-IP-0842, Rev. 1A, Vol. IV, Section 4.16 (Banning 1999).« less

  10. From Testing to Teaching: The Use of Interim Assessments in Classroom Instruction. CPRE Research Report # RR-65

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…

  11. 75 FR 13296 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... INTER-AMERICAN FOUNDATION BOARD MEETING Sunshine Act Meetings TIME AND DATE: March 29, 2010; 9:00...). MATTERS TO BE CONSIDERED: Approval of the Minutes of the December 14, 2009, Meeting of the Board of... Operations Report RedEAmerica Status Advisory Council Membership and Attendance at Meetings Status of...

  12. Implementation of the Career Education Incentive Act. First Interim Report on the Evaluability Assessment.

    ERIC Educational Resources Information Center

    Jung, Steven M.; And Others

    Survey activities are reported which were designed to provide the foundation for a national evaluation of the effectiveness of programs assisted under the Career Education Incentive Act of 1977 (PL 95-207). The methodology described, called "program evaluability assessment," focuses on detailed analysis of program assumptions in order to…

  13. Interim analysis: A rational approach of decision making in clinical trial.

    PubMed

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  14. Determination of rainfall losses in Virginia, phase II : interim report.

    DOT National Transportation Integrated Search

    1981-01-01

    This interim report summarizes results obtained for the project through May 1981. The objective of the study is to develop rainfall loss parameters for localities in Virginia. For this purpose, the state has been divided into eleven hydrologic region...

  15. The Environmental Education Act of 1970: Success or Failure?

    ERIC Educational Resources Information Center

    Marcus, Melvin G.

    1984-01-01

    Identifies and interprets several problems that beset environmental education (EE) and the Office of Environmental Education (OEE). Areas addressed include Public Law 91-516 (Environmental Education Act) and the OEE, problems related to implementing the act, funding, misinterpretation of the act's intent, the act's identity, and the status of EE…

  16. Interim Report on the Evaluation of the Growth Model Pilot Project

    ERIC Educational Resources Information Center

    Hoffer, Thomas B.; Hedberg, E. C.; Brown, Kevin L.; Halverson, Marie L.; McDonald, Sarah-Kathryn

    2010-01-01

    The Growth Model Pilot Project (GMPP) was initiated to allow states to experiment with adjustments to the No Child Left Behind Act (NCLB) status accountability system in order to improve the validity of AYP determinations by giving schools credit for students who are making significant growth. The pilot allowed states, districts, and schools to…

  17. 49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Prospective use of rights-of-way for interim trail... Governing Notice, Applications, Financial Assistance, Acquisition for Public Use, and Trail Use § 1152.29 Prospective use of rights-of-way for interim trail use and rail banking. (a) If any state, political...

  18. 75 FR 48336 - Sunshine Act Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION Sunshine Act Notice Time and Date: 3 p.m., Thursday, August 12, 2010. Place: The Richard V. Backley Hearing Room, 9th Floor, 601 New Jersey Avenue, NW., Washington, DC. Status: Open. Matters To Be Considered: The Commission will consider and act upon the...

  19. Status update and interim results from the asymptomatic carotid surgery trial-2 (ACST-2).

    PubMed

    Halliday, Alison; Bulbulia, Richard; Gray, William; Naughten, Ally; den Hartog, Anne; Delmestri, Antonella; Wallis, Carol; le Conte, Stephanie; Macdonald, Sumaira

    2013-11-01

    ACST-2 is currently the largest trial ever conducted to compare carotid artery stenting (CAS) with carotid endarterectomy (CEA) in patients with severe asymptomatic carotid stenosis requiring revascularization. Patients are entered into ACST-2 when revascularization is felt to be clearly indicated, when CEA and CAS are both possible, but where there is substantial uncertainty as to which is most appropriate. Trial surgeons and interventionalists are expected to use their usual techniques and CE-approved devices. We report baseline characteristics and blinded combined interim results for 30-day mortality and major morbidity for 986 patients in the ongoing trial up to September 2012. A total of 986 patients (687 men, 299 women), mean age 68.7 years (SD ± 8.1) were randomized equally to CEA or CAS. Most (96%) had ipsilateral stenosis of 70-99% (median 80%) with contralateral stenoses of 50-99% in 30% and contralateral occlusion in 8%. Patients were on appropriate medical treatment. For 691 patients undergoing intervention with at least 1-month follow-up and Rankin scoring at 6 months for any stroke, the overall serious cardiovascular event rate of periprocedural (within 30 days) disabling stroke, fatal myocardial infarction, and death at 30 days was 1.0%. Early ACST-2 results suggest contemporary carotid intervention for asymptomatic stenosis has a low risk of serious morbidity and mortality, on par with other recent trials. The trial continues to recruit, to monitor periprocedural events and all types of stroke, aiming to randomize up to 5,000 patients to determine any differential outcomes between interventions. ISRCTN21144362. Copyright © 2013 European Society for Vascular Surgery. Published by Elsevier Ltd. All rights reserved.

  20. Evaluation of US 119 Pine Mountain safety improvements : interim report.

    DOT National Transportation Integrated Search

    2003-10-01

    The safety improvement project for a section of US 119 across Pine Mountain in Letcher County was initiated as an interim effort to address safety issues related t o roadway geometrics and specific problems related to truck traffic. : Specific object...

  1. The Clery Act on Campus: Status Update and Gender Implications

    ERIC Educational Resources Information Center

    Lee, E. Ashleigh Schuller

    2017-01-01

    This chapter provides a summary of the history of the Clery Act and reviews the latest developments of the Violence Against Women Reauthorization Act. In light of this legislation, campus collaboration should occur to ensure students' safety and institutional legal compliance regarding mandatory reporting requirements.

  2. Conceptual design statement of work for the immobilized low-activity waste interim storage facility project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, T.A., Fluor Daniel Hanford

    1997-02-06

    The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.

  3. Public School Finance Problems in Texas. An Interim Report.

    ERIC Educational Resources Information Center

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  4. Interim Evaluation of the National Literacy Program. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Social Development Canada, 2007

    2007-01-01

    The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…

  5. ACTS propagation experiment discussion: Ka-band propagation measurements using the ACTS propagation terminal and the CSU-CHILL and Space Communications Technology Center Florida propagation program

    NASA Technical Reports Server (NTRS)

    Bringi, V. N.; Chandrasekar, V.; Mueller, Eugene A.; Turk, Joseph; Beaver, John; Helmken, Henry F.; Henning, Rudy

    1993-01-01

    Papers on Ka-band propagation measurements using the ACTS propagation terminal and the Colorado State University CHILL multiparameter radar and on Space Communications Technology Center Florida Propagation Program are discussed. Topics covered include: microwave radiative transfer and propagation models; NASA propagation terminal status; ACTS channel characteristics; FAU receive only terminal; FAU terminal status; and propagation testbed.

  6. Medicaid program; home and community-based services waivers for individuals age 65 or older--HCFA. Interim final rule with comment period.

    PubMed

    1992-06-30

    This interim final rule amends current Medicaid regulations to permit States to offer, under a Secretarial waiver, a wide array of home and community-based services to individuals age 65 or older who are determined, but for the provision of these services, to be likely to require the level of care furnished in a skilled nursing facility (SNF) or intermediate care facility (ICF) (nursing facility (NF) effective October 1, 1990). The rule allows Federal payment for these and other long term care services, up to an amount specified in section 1915(d)(5)(B) of the Social Security Act, subject to HCFA's approval of the States' requests for waivers and certain assurances made by the States. Once granted, waivers are in effect for 3 years, unless terminated by the State with notice to the Secretary, and are renewable for periods of 5 years. Periodic evaluation, assessment, and review of the care furnished under the waivers is required. This rule implements section 4102 of the Omnibus Budget Reconciliation Act of 1987, as modified by section 411(k) of the Medicare Catastrophic Coverage Act of 1988, section 8432 of the Technical and Miscellaneous Revenue Act of 1988, and section 4741(b) of the Omnibus Budget Reconciliation Act of 1990. This rule is being issued in final and, for the most part, without a delay in the effective date for the reasons explained in section IV, "Waiver of Proposed Rulemaking and Delay in the Effective Date."

  7. The Voting Rights Act: Unfulfilled Goals.

    ERIC Educational Resources Information Center

    Commission on Civil Rights, Washington, DC.

    This report examines the current status of minority voting rights covered by the special provisions of the Voting Rights Act of 1965. The special provisions prescribe added protection of minority voting rights in those jurisdictions where discrimination in voting has been most pervasive. The report explains the Voting Rights Act and discusses its…

  8. 40 CFR 265.383 - Interim status thermal treatment devices burning particular hazardous waste.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... devices burning particular hazardous waste. 265.383 Section 265.383 Protection of Environment... status thermal treatment devices burning particular hazardous waste. (a) Owners or operators of thermal treatment devices subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or...

  9. 40 CFR 265.383 - Interim status thermal treatment devices burning particular hazardous waste.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... devices burning particular hazardous waste. 265.383 Section 265.383 Protection of Environment... status thermal treatment devices burning particular hazardous waste. (a) Owners or operators of thermal treatment devices subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or...

  10. 40 CFR 265.383 - Interim status thermal treatment devices burning particular hazardous waste.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... devices burning particular hazardous waste. 265.383 Section 265.383 Protection of Environment... status thermal treatment devices burning particular hazardous waste. (a) Owners or operators of thermal treatment devices subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or...

  11. 40 CFR 265.383 - Interim status thermal treatment devices burning particular hazardous waste.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... devices burning particular hazardous waste. 265.383 Section 265.383 Protection of Environment... status thermal treatment devices burning particular hazardous waste. (a) Owners or operators of thermal treatment devices subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or...

  12. 40 CFR 265.383 - Interim status thermal treatment devices burning particular hazardous waste.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... devices burning particular hazardous waste. 265.383 Section 265.383 Protection of Environment... status thermal treatment devices burning particular hazardous waste. (a) Owners or operators of thermal treatment devices subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or...

  13. System architecture for the Canadian interim mobile satellite system

    NASA Technical Reports Server (NTRS)

    Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.

    1988-01-01

    The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.

  14. 5th ESA Workshop on Joint Interim Approaches to NAS Recommendations

    EPA Pesticide Factsheets

    EPA and its federal partners, Fish and Wildlife Service and National Marine Fisheries Service, held a two-day meeting that provided a forum for stakeholder suggestions for refining some of the interim scientific methods

  15. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  16. Interim Stabilization Equipment Essential and Support Drawing Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    KOCH, M.R.

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  17. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... AND URBAN DEVELOPMENT FAIR HOUSING CERTIFICATION AND FUNDING OF STATE AND LOCAL FAIR HOUSING... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to...

  18. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... AND URBAN DEVELOPMENT FAIR HOUSING CERTIFICATION AND FUNDING OF STATE AND LOCAL FAIR HOUSING... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to...

  19. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AND URBAN DEVELOPMENT FAIR HOUSING CERTIFICATION AND FUNDING OF STATE AND LOCAL FAIR HOUSING... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to...

  20. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... AND URBAN DEVELOPMENT FAIR HOUSING CERTIFICATION AND FUNDING OF STATE AND LOCAL FAIR HOUSING... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to...

  1. Cancer Preventive Services, Socioeconomic Status and the Affordable Care Act

    PubMed Central

    Cooper, Gregory S; Kou, Tzuyung Doug; Dor, Avi; Koroukian, Siran M; Schluchter, Mark D

    2016-01-01

    Background Out of pocket expenditures are thought to be an important barrier to receipt of cancer preventive services, especially among lower socioeconomic status (SES). The Affordable Care Act (ACA) eliminated out-of-pocket expenditures for recommended services, including mammography and colonoscopy. Our objective was to determine changes in uptake of mammography and colonoscopy among fee-for-service Medicare beneficiaries before and after ACA implementation. Methods Using Medicare claims data, we identified women ≥ 70 without mammography in the previous 2 years, and men and women ≥ 70 at increased risk for colorectal cancer without colonoscopy in the past 5 years. We identified procedure receipt in the two-year period prior to ACA implementation (2009-2010) and after implementation (2011-September 2012). Multivariable generalized estimating equation models determine the independent association of and county-level quartile of median income and education with receipt of testing. Results For mammography, lower SES quartile was associated with less uptake but the post-ACA disparities were smaller compared to the pre-ACA period. In addition, mammography rates increased from pre- to post-ACA in all SES quartiles. For colonoscopy, in both the pre- and post-ACA periods, there was an association between uptake and educational level and to some extent, income. However, there were no appreciable changes with colonoscopy and SES following the ACA. Conclusions Removal of out-of-pocket expenditures may overcome a barrier to receipt of recommended preventive services but for colonoscopy, other procedural factors may remain as deterrents. PMID:28067955

  2. National Home Start Evaluation. Interim Report V: Case Studies.

    ERIC Educational Resources Information Center

    Jerome, Chris H.; And Others

    One of a series of documents on the evaluation of the National Home Start (NHS) program this third year interim report of case studies describes program efforts and successes with 16 Home Start families throughout the nation. A federally funded demonstration program, NHS is aimed at providing home-based services (such as health, education,…

  3. Modeling Parenting Programs as an Interim Service for Families Waiting for Children's Mental Health Treatment.

    PubMed

    Cunningham, Charles E; Rimas, Heather; Chen, Yvonne; Deal, Ken; McGrath, Patrick; Lingley-Pottie, Patricia; Reid, Graham J; Lipman, Ellen; Corkum, Penny

    2015-01-01

    Using a discrete choice conjoint experiment, we explored the design of parenting programs as an interim strategy for families waiting for children's mental health treatment. Latent class analysis yielded 4 segments with different design preferences. Simulations predicted the Fast-Paced Personal Contact segment, 22.1% of the sample, would prefer weekly therapist-led parenting groups. The Moderate-Paced Personal Contact segment (24.7%) preferred twice-monthly therapist-led parenting groups with twice-monthly lessons. The Moderate-Paced E-Contact segment (36.3%), preferred weekly to twice-monthly contacts, e-mail networking, and a program combining therapist-led sessions with the support of a computerized telephone e-coach. The Slow-Paced E-Contact segment (16.9%) preferred an approach combining monthly therapist-led sessions, e-coaching, and e-mail networking with other parents. Simulations predicted 45.3% of parents would utilize an option combining 5 therapist coaching calls with 5 e-coaching calls, a model that could reduce costs and extend the availability of interim services. Although 41.0% preferred weekly pacing, 58% were predicted to choose an interim parenting service conducted at a twice-monthly to monthly pace. The results of this study suggest that developing interim services reflecting parental preferences requires a choice of formats that includes parenting groups, telephone-coached distance programs, and e-coaching options conducted at a flexible pace.

  4. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Astrophysics Data System (ADS)

    Committee On Science Opportunities Enabled By Nasa'S Constellation System, National Research Council

    To begin implementation of the Vision for Space Exploration (recently renamed "United States Space Exploration Policy"), NASA has begun development of new launch vehicles and a human-carrying spacecraft that are collectively called the Constellation System. In November 2007, NASA asked the NRC to evaluate the potential for the Constellation System to enable new space science opportunities. For this interim report, 11 existing "Vision Mission" studies of advanced space science mission concepts inspired by earlier NASA forward-looking studies were evaluated. The focus was to assess the concepts and group them into two categories: more-deserving or less deserving of future study. This report presents a description of the Constellation System and its opportunities for enabling new space science opportunities, and a systematic analysis of the 11 Vision Mission studies. For the final report, the NRC issued a request for information to the relevant communities to obtain ideas for other mission concepts that will be assessed by the study committee, and several issues addressed only briefly in the interim report will be explored more fully.

  5. Success of Two-Stage Reimplantation in Patients Requiring an Interim Spacer Exchange.

    PubMed

    George, Jaiben; Miller, Evan M; Curtis, Gannon L; Klika, Alison K; Barsoum, Wael K; Mont, Michael A; Higuera, Carlos A

    2018-03-23

    Some patients undergoing a 2-stage revision for a periprosthetic joint infection require a repeat spacer in the interim (removal of existing spacer with insertion of a new spacer or spacer exchange) due to persistent infection. The objectives of this study are to (1) determine the factors associated with patients who receive a repeat spacer and (2) compare the infection-free survival (overall and stratified by joint type) of reimplantation in patients who did or did not receive a repeat spacer. From 2001 to 2014, 347 hip or knee 2-stage revisions that finally underwent reimplantation and had a minimum 2-year follow-up were identified. An interim spacer exchange was performed in 59 (17%) patients (exchange cohort). Patient-related and organism-related factors were compared between the exchange and non-exchange cohorts. Kaplan-Meier survival curves were performed to assess the success (absence of signs of infection, reoperation for infection, periprosthetic joint infection-related mortality) of both cohorts. Patients in the exchange group had higher comorbidity score (P = .020), prolonged time to reimplantation (P < .001), and higher prevalence of resistant organisms, though not statistically significant (P = .091). The 5-year infection-free survival rates were 64% (knee 62%, hip 64%) in the exchange cohort, and 78% (knee 77%, hip 78%) in the non-exchange cohort (P = .020). Patients requiring an interim spacer exchange were found to have more comorbidities, prolonged treatment period, and were more likely to be infected with a resistant organism. About one-third of such patients became reinfected within 5 years compared to only one-fifth of the patients without an interim spacer exchange. Copyright © 2018 Elsevier Inc. All rights reserved.

  6. 77 FR 31374 - Notice of Submission of Proposed Information Collection to OMB; Rural Housing Stability Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... through the HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP... HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP require...

  7. Mental health pharmacists as interim prescribers

    PubMed Central

    2017-01-01

    Introduction: Turnover leading to fluctuations in prescriber availability presents many challenges, most notably in access to and continuity of care. In 2015, the Veterans Affairs Eastern Colorado Healthcare System (VA ECHCS) experienced a period of significant mental health prescriber turnover leading to patient utilization of psychiatric emergency services (PES) for nonemergent medication management. The resulting increase in volume placed excessive stress on PES prescribers. Mental health pharmacists have opportunities to provide interim medication management while patients are between prescribers. Methods: This study was a retrospective, cohort study of patients unassigned to an outpatient mental health prescriber due to prescriber turnover, receiving care at VA ECHCS between October 1, 2015, and February 28, 2016. The primary outcome was the number of pharmacist interventions performed. Secondary outcomes characterize the interventions performed and describe the change in the mean monthly volume of patients presenting to PES. Results: In this veteran population, 152 interventions were performed in 81 unique patients. The most common intervention was prescription renewals (80%). Interventions most commonly involved antidepressants (28%), antipsychotics (10%), and mood stabilizers (10%). Before initiation of the clinic, Denver VA PES experienced a mean of 300 monthly visits. After clinic implementation, PES visits decreased significantly to a mean of 237 visits per month (P = .041). Discussion: The pharmacist interim prescriber clinic was associated with a significant decrease in mean number of patients seen per month in PES. The success of the clinic also contributed to interest by the mental health service to expand clinical pharmacy services.

  8. 20 CFR 209.5 - Information regarding change in status.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... employer in any company which may affect the status of the company as an employer under the Railroad... employer of any company which may give that company status as an employer under the Railroad Retirement Act and Railroad Unemployment Insurance Act. The notice must fully advise the Board of the type of change...

  9. Prognostic value of interim FDG-PET in R-CHOP-treated diffuse large B-cell lymphoma: Systematic review and meta-analysis.

    PubMed

    Adams, Hugo J A; Kwee, Thomas C

    2016-10-01

    This study aimed to systematically review and meta-analyze the prognostic value of interim (18)F-fluoro-2-deoxy-d-glucose positron emission tomography (FDG-PET) in diffuse large B-cell lymphoma (DLBCL) patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). MEDLINE and EMBASE were systematically searched for suitable studies. Included studies were methodologically appraised, and results were summarized both descriptively and meta-analytically. Nine studies, comprising a total of 996 R-CHOP-treated DLBCL patients, were included. Overall, studies were of moderate methodological quality. The area under the summary receiver operating curve (AUC) of interim FDG-PET in predicting treatment failure and death were 0.651 and 0.817, respectively. There was no heterogeneity in diagnostic odds ratios across available studies (I(2)=0.0%). At multivariable analysis, 2 studies reported interim FDG-PET to have independent prognostic value in addition to the International Prognostic Index (IPI) in predicting treatment failure, whereas 3 studies reported that this was not the case. One study reported interim FDG-PET to have independent prognostic value in addition to the IPI in predicting death, whereas 2 studies reported that this was not the case. In conclusion, interim FDG-PET in R-CHOP-treated DLBCL has some correlation with outcome, but its prognostic value is homogeneously suboptimal across studies and it has not consistently proven to surpass the prognostic potential of the IPI. Moreover, there is a lack of studies that compared interim FDG-PET to the recently developed and superior National Comprehensive Cancer Network-IPI. Therefore, at present there is no scientific base to support the clinical use of interim FDG-PET in R-CHOP-treated DLBCL. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  10. Developing a concept for a national used fuel interim storage facility in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Donald Wayne

    2013-07-01

    In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a 'Monitored Retrievable Storage' facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to buildmore » a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE's goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility. (authors)« less

  11. Lessons learned from the Siting Process of an Interim Storage Facility in Spain - 12024

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lamolla, Meritxell Martell

    2012-07-01

    On 29 December 2009, the Spanish government launched a site selection process to host a centralised interim storage facility for spent fuel and high-level radioactive waste. It was an unprecedented call for voluntarism among Spanish municipalities to site a controversial facility. Two nuclear municipalities, amongst a total of thirteen municipalities from five different regions, presented their candidatures to host the facility in their territories. For two years the government did not make a decision. Only in November 30, 2011, the new government elected on 20 November 2011 officially selected a non-nuclear municipality, Villar de Canas, for hosting this facility. Thismore » paper focuses on analysing the factors facilitating and hindering the siting of controversial facilities, in particular the interim storage facility in Spain. It demonstrates that involving all stakeholders in the decision-making process should not be underestimated. In the case of Spain, all regional governments where there were candidate municipalities willing to host the centralised interim storage facility, publicly opposed to the siting of the facility. (author)« less

  12. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less

  13. President's Information Technology Advisory Committee Interim Report to the President.

    ERIC Educational Resources Information Center

    National Coordination Office for Information Technology Research and Development, Arlington, VA.

    This document is the Interim Report on future directions for Federal support of research and development in high performance computing, communications, information technology, and the Next Generation Internet. This report provides a more detailed explanation of the findings and recommendations summarized by the President's Information Technology…

  14. Report of the Michigan Interim Action Committee on Indian Problems.

    ERIC Educational Resources Information Center

    Adams, Doris; And Others

    Stressing the importance of American Indian involvement in affairs affecting Michigan's Indian population, this report by the Interim Action Committee on Indian Problems presents recommendations relative to education, employment, health, and the Commission on Indian Affairs. Recommendations for the commission emphasize: leadership at the local,…

  15. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TORRES, T.D.

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation

  16. How the University of Texas system responded to the need for interim storage of low-level radioactive waste materials.

    PubMed

    Emery, Robert J

    2012-11-01

    Faced with the prospect of being unable to permanently dispose of low-level radioactive wastes (LLRW) generated from teaching, research, and patient care activities, component institutions of the University of Texas System worked collaboratively to create a dedicated interim storage facility to be used until a permanent disposal facility became available. Located in a remote section of West Texas, the University of Texas System Interim Storage Facility (UTSISF) was licensed and put into operation in 1993, and since then has provided safe and secure interim storage for up to 350 drums of dry solid LLRW at any given time. Interim storage capability provided needed relief to component institutions, whose on-site waste facilities could have possibly become overburdened. Experiences gained from the licensing and operation of the site are described, and as a new permanent LLRW disposal facility emerges in Texas, a potential new role for the storage facility as a surge capacity storage site in times of natural disasters and emergencies is also discussed.

  17. Interim reliability evaluation program, Browns Ferry fault trees

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.

  18. Making the Most of Interim Assessment Data. Lessons from Philadelphia

    ERIC Educational Resources Information Center

    Christman, Jolley Bruce; Neild, Ruth Curran; Bulkley, Katrina; Blanc, Suzanne; Liu, Roseann; Mitchell, Cecily; Travers, Eva

    2009-01-01

    Under No Child Left Behind, urban school districts have increasingly turned to interim assessments, administered at regular intervals, to help gauge student progress in advance of annual state exams. These assessments have spawned growing debate among educators, assessment experts, and the testing industry: are they worth the significant…

  19. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  20. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  1. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  2. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  3. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  4. Establishing confidence in CCV/ACT technology

    NASA Technical Reports Server (NTRS)

    Holloway, R. B.; Shomber, H. A.

    1976-01-01

    Despite significant advancements in controls configured vehicles/active controls technology (CCV/ACT) in the past decade, few applications of this promising technology have appeared in recent aircraft designs. The status of CCV/ACT is summarized, and some of the constraints which are retarding its wider application are described. Suggestions toward establishing an increased level of confidence in the technology are given.

  5. 46 CFR 308.202 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....202 Section 308.202 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.202 Issuance of interim... terms, conditions, and warranties contained in the application for war risk protection and indemnity...

  6. 46 CFR 308.202 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....202 Section 308.202 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.202 Issuance of interim... terms, conditions, and warranties contained in the application for war risk protection and indemnity...

  7. 46 CFR 308.202 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....202 Section 308.202 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.202 Issuance of interim... terms, conditions, and warranties contained in the application for war risk protection and indemnity...

  8. 46 CFR 308.202 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....202 Section 308.202 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.202 Issuance of interim... terms, conditions, and warranties contained in the application for war risk protection and indemnity...

  9. 46 CFR 308.202 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....202 Section 308.202 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.202 Issuance of interim... terms, conditions, and warranties contained in the application for war risk protection and indemnity...

  10. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Interim final rule with comment period.

    PubMed

    2005-03-25

    This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.

  11. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less

  12. 77 FR 13126 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION Sunshine Act Meeting Notice TIME AND DATE: 10 a.m., Thursday, March 8, 2012. PLACE: The Richard V. Backley Hearing Room, 9th Floor, 601 New Jersey Avenue NW., Washington, DC. STATUS: Open. MATTERS TO BE CONSIDERED: The Commission will consider and act upon the...

  13. Pupil Inquiry Behavior Analysis and Change Activity. Interim Project Report.

    ERIC Educational Resources Information Center

    Manion, Raymond C.

    This interim report discusses progress toward three major goals of the Pupil Inquiry Behavior Analysis and Change Activity: increased pupil inquiry, changed teacher behavior to facilitate pupil inquiry, and the development of a 32-week course of instruction to provide for these behavioral changes. Data currently available deals with the emotional…

  14. Transitional Leadership: Perceptions of Interim Mid-Level Student Affairs Professionals

    ERIC Educational Resources Information Center

    Boerner, William A.

    2011-01-01

    It has been estimated that, due to increased turnover, an aging population, growing complexities and sizes of institutions, as well as the bureaucratization of searches, college and universities will see a continued increase in the utilization of interim leadership (Padilla, 2004). Student affairs divisions are not immune to this phenomenon and…

  15. To Have and to Hold: Reflections of an Interim Director

    ERIC Educational Resources Information Center

    Hibl, Lisa M.

    2018-01-01

    Leading a long-established LLC as an Interim Director poses particular challenges and rewards. Uncertainties abound for the program and for the individual. Professionally speaking, taking on the hybrid role of faculty/ administrator can be both difficult and exciting. Ultimately, the solutions are in the details. Listening carefully to students,…

  16. Functions and requirements document for interim store solidified high-level and transuranic waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less

  17. 76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... DEPARTMENT OF COMMERCE Patent and Trademark Office [Docket No. PTO-P-2011-0001] Grant of Interim... Office, Commerce. ACTION: Notice of interim patent term extension. SUMMARY: The United States Patent and... States Patent and Trademark Office. [FR Doc. 2011-2088 Filed 1-31-11; 8:45 am] BILLING CODE 3510-16-P ...

  18. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  19. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  20. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  1. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  2. 33 CFR 154.1120 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Facility Operating in Prince William Sound, Alaska § 154.1120 Operating restrictions and interim operating authorization. (a) The owner or operator of a TAPAA facility may not operate in Prince William Sound, Alaska... practicable, a worst case discharge or a discharge of 200,000 barrels of oil, whichever is grater, in Prince...

  3. Latex and microsilica modified concrete bridge deck overlays in Oregon : interim report.

    DOT National Transportation Integrated Search

    1994-08-01

    This interim report presented information collected from 24 bridge deck overlays constructed in Oregon between 1989 and 1993. Decks were placed on a variety of existing structures using hydroblasting, milling and diamond grinding surface preparation....

  4. Evaluation of experimental rumble strip areas in Louisiana : interim report No. 1.

    DOT National Transportation Integrated Search

    1985-03-01

    This interim report was prepared to provide a review of nineteen rumble strip areas installed experimentally in Louisiana between August 1982 and September 1983. Situated randomly throughout central and southern Louisiana, construction of these coars...

  5. Different predictive values of interim 18F-FDG PET/CT in germinal center like and non-germinal center like diffuse large B-cell lymphoma.

    PubMed

    Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung

    2017-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for

  6. Quantifying the bias in the estimated treatment effect in randomized trials having interim analyses and a rule for early stopping for futility.

    PubMed

    Walter, S D; Han, H; Briel, M; Guyatt, G H

    2017-04-30

    In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  7. Interim Calibration Report for the SMMR Simulator

    NASA Technical Reports Server (NTRS)

    Gloersen, P.; Cavalieri, D.

    1979-01-01

    The calibration data obtained during the fall 1978 Nimbus-G underflight mission with the scanning multichannel microwave radiometer (SMMR) simulator on board the NASA CV-990 aircraft were analyzed and an interim calibration algorithm was developed. Data selected for the analysis consisted of in flight sky, first-year sea ice, and open water observations, as well as ground based observations of fixed targets with varied temperatures of selected instrument components. For most of the SMMR channels, a good fit to the selected data set was obtained with the algorithm.

  8. The role and meaning of interim housing in housing first programs for people experiencing homelessness and mental illness.

    PubMed

    Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky

    2014-07-01

    The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.

  9. SWSA 6 interim corrective measures environmental monitoring: FY 1990 results. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwood, T.L.; Spalding, B.P.

    1991-07-01

    This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levelsmore » in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs.« less

  10. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....302 Section 308.302 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in...

  11. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....302 Section 308.302 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in...

  12. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....302 Section 308.302 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in...

  13. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....302 Section 308.302 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in...

  14. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....302 Section 308.302 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in...

  15. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    PubMed

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  16. Building an Interim Assessment System: A Workbook for School Districts

    ERIC Educational Resources Information Center

    Crane, Eric W.

    2010-01-01

    As someone with a stake in a school district's systems, a person probably does not have all the answers around what is necessary to build an effective interim assessment system. Neither does this workbook. But it is intended to have the right questions. More precisely, this workbook contains the vision, infrastructure, and resource questions…

  17. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC...

  18. Evaluation of wide edgelines on two-lane rural roads : interim report.

    DOT National Transportation Integrated Search

    1985-01-01

    This interim report presents the results of an evaluation of 4-in and 8-in wide edgellnes on the lateral placement and speeds of vehicles on two-lane rural roads. Data were collected at twelve locations on sections of roadway covering 55.2 ml. Two me...

  19. 2008 interim guidelines for growing longleaf pine seedlings in container nurseries

    Treesearch

    R. Kasten Dumroese; James P. Barnett; D. Paul Jackson; Mark J. Hainds

    2013-01-01

    Production of container longleaf pine (Pinus palustris Mill.) seedlings for reforestation and restoration exceeds that of bare-root production, but information on container production techniques has been slow to develop. Because outplanting success requires quality seedlings, interim guidelines were proposed in 2002 to assist nursery managers and...

  20. 2008 interim guidelines for growing longleaf pine seedlings in container nurseries

    Treesearch

    R. Kasten Dumroese; James P. Barnett; D. Paul Jackson; Mark J. Hainds

    2009-01-01

    Production of container longleaf pine (Pinus palustris) seedlings for reforestation and restoration plantings exceeds that of bareroot production, but information on container production techniques has been slow to develop. Because success of those outplantings requires quality seedlings, interim guidelines were proposed in 2002 to assist nursery...

  1. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    PubMed

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  2. Continuous Covariate Imbalance and Conditional Power for Clinical Trial Interim Analyses

    PubMed Central

    Ciolino, Jody D.; Martin, Renee' H.; Zhao, Wenle; Jauch, Edward C.; Hill, Michael D.; Palesch, Yuko Y.

    2014-01-01

    Oftentimes valid statistical analyses for clinical trials involve adjustment for known influential covariates, regardless of imbalance observed in these covariates at baseline across treatment groups. Thus, it must be the case that valid interim analyses also properly adjust for these covariates. There are situations, however, in which covariate adjustment is not possible, not planned, or simply carries less merit as it makes inferences less generalizable and less intuitive. In this case, covariate imbalance between treatment groups can have a substantial effect on both interim and final primary outcome analyses. This paper illustrates the effect of influential continuous baseline covariate imbalance on unadjusted conditional power (CP), and thus, on trial decisions based on futility stopping bounds. The robustness of the relationship is illustrated for normal, skewed, and bimodal continuous baseline covariates that are related to a normally distributed primary outcome. Results suggest that unadjusted CP calculations in the presence of influential covariate imbalance require careful interpretation and evaluation. PMID:24607294

  3. Patient Protection and Affordable Care Act

    THOMAS, 111th Congress

    Rep. Rangel, Charles B. [D-NY-15

    2009-09-17

    03/23/2010 Became Public Law No: 111-148. (TXT | PDF) (All Actions) Notes: H.R.4872 makes a number of health-related financing and revenue changes to this bill. Read together, this bill and the health care-related provisions of H.R.4872 are commonly referred to as the Affordable Care Act (ACA). Tracker: This bill has the status Became LawHere are the steps for Status of Legislation:

  4. Interim analyses in 2 x 2 crossover trials.

    PubMed

    Cook, R J

    1995-09-01

    A method is presented for performing interim analyses in long term 2 x 2 crossover trials with serial patient entry. The analyses are based on a linear statistic that combines data from individuals observed for one treatment period with data from individuals observed for both periods. The coefficients in this linear combination can be chosen quite arbitrarily, but we focus on variance-based weights to maximize power for tests regarding direct treatment effects. The type I error rate of this procedure is controlled by utilizing the joint distribution of the linear statistics over analysis stages. Methods for performing power and sample size calculations are indicated. A two-stage sequential design involving simultaneous patient entry and a single between-period interim analysis is considered in detail. The power and average number of measurements required for this design are compared to those of the usual crossover trial. The results indicate that, while there is minimal loss in power relative to the usual crossover design in the absence of differential carry-over effects, the proposed design can have substantially greater power when differential carry-over effects are present. The two-stage crossover design can also lead to more economical studies in terms of the expected number of measurements required, due to the potential for early stopping. Attention is directed toward normally distributed responses.

  5. 77 FR 11116 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Jersey Avenue NW., Washington, DC. STATUS: Open. MATTERS TO BE CONSIDERED: The Commission will consider and act upon the following in open session: Secretary of Labor v. Black Beauty Coal Co., Docket No...

  6. CMM Interim Check (U)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montano, Joshua Daniel

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interimmore » check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.« less

  7. Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…

  8. Cancer preventive services, socioeconomic status, and the Affordable Care Act.

    PubMed

    Cooper, Gregory S; Kou, Tzuyung Doug; Dor, Avi; Koroukian, Siran M; Schluchter, Mark D

    2017-05-01

    Out-of-pocket expenditures are thought to be an important barrier to the receipt of cancer preventive services, especially for those of a lower socioeconomic status (SES). The Affordable Care Act (ACA) eliminated out-of-pocket expenditures for recommended services, including mammography and colonoscopy. The objective of this study was to determine changes in the uptake of mammography and colonoscopy among fee-for-service Medicare beneficiaries before and after ACA implementation. Using Medicare claims data, this study identified women who were 70 years old or older and had not undergone mammography in the previous 2 years and men and women who were 70 years old or older, were at increased risk for colorectal cancer, and had not undergone colonoscopy in the past 5 years. The receipt of procedures in the 2-year period before the ACA's implementation (2009-2010) and after its implementation (2011 to September 2012) was also identified. Multivariate generalized estimating equation models were used to determine the independent association and county-level quartile of median income and education with the receipt of testing. For mammography, a lower SES quartile was associated with less uptake, but the post-ACA disparities were smaller than those in the pre-ACA period. In addition, mammography rates increased from the pre-ACA period to the post-ACA period in all SES quartiles. For colonoscopy, in both the pre- and post-ACA periods, there was an association between uptake and educational level and, to some extent, income. However, there were no appreciable changes in colonoscopy and SES after implementation of the ACA. The removal of out-of-pocket expenditures may overcome a barrier to the receipt of recommended preventive services, but for colonoscopy, other procedural factors may remain as deterrents. Cancer 2017;123:1585-1589. © 2017 American Cancer Society. © 2017 American Cancer Society.

  9. 78 FR 16709 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ..., 500 E Street SW., Washington, DC 20436, Telephone: (202) 205-2000. STATUS: Open to the public. MATTERS... of the following meeting. Dated: March 14, 2013. By order of the Commission. Lisa R. Barton, Acting...

  10. 78 FR 73206 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-05

    ... 101, 500 E Street SW., Washington, DC 20436, Telephone: (202) 205-2000. STATUS: Open to the public.... Dated: December 3, 2013. Lisa R. Barton, Acting Secretary to the Commission. [FR Doc. 2013-29205 Filed...

  11. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  12. The Health Care System for Veterans: An Interim Report

    DTIC Science & Technology

    2007-12-01

    2 . REPORT TYPE 3. DATES COVERED 00-00-2007 to 00-00-2007 4. TITLE AND SUBTITLE The Health Care System for Veterans: An Interim Report 5a...com- prised of several clinical practice guidelines in the areas of ischemic heart disease, hypertension, diabetes mellitus , major depressive...disorder, schizophrenia, and tobacco use cessation . The percent compliance is an average of the separate indicators.” See Department of Veterans Affairs

  13. Data Analysis of GPM Constellation Satellites-IMERG and ERA-Interim precipitation products over West of Iran

    NASA Astrophysics Data System (ADS)

    Sharifi, Ehsan; Steinacker, Reinhold; Saghafian, Bahram

    2016-04-01

    Precipitation is a critical component of the Earth's hydrological cycle. The primary requirement in precipitation measurement is to know where and how much precipitation is falling at any given time. Especially in data sparse regions with insufficient radar coverage, satellite information can provide a spatial and temporal context. Nonetheless, evaluation of satellite precipitation is essential prior to operational use. This is why many previous studies are devoted to the validation of satellite estimation. Accurate quantitative precipitation estimation over mountainous basins is of great importance because of their susceptibility to hazards. In situ observations over mountainous areas are mostly limited, but currently available satellite precipitation products can potentially provide the precipitation estimation needed for meteorological and hydrological applications. One of the newest and blended methods that use multi-satellites and multi-sensors has been developed for estimating global precipitation. The considered data set known as Integrated Multi-satellitE Retrievals (IMERG) for GPM (Global Precipitation Measurement) is routinely produced by the GPM constellation satellites. Moreover, recent efforts have been put into the improvement of the precipitation products derived from reanalysis systems, which has led to significant progress. One of the best and a worldwide used model is developed by the European Centre for Medium Range Weather Forecasts (ECMWF). They have produced global reanalysis daily precipitation, known as ERA-Interim. This study has evaluated one year of precipitation data from the GPM-IMERG and ERA-Interim reanalysis daily time series over West of Iran. IMERG and ERA-Interim yield underestimate the observed values while IMERG underestimated slightly and performed better when precipitation is greater than 10mm. Furthermore, with respect to evaluation of probability of detection (POD), threat score (TS), false alarm ratio (FAR) and probability

  14. 76 FR 24463 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday, May 20, 2011. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. [[Page 24464

  15. Interim Cryogenic Propulsion Stage (ICPS) Handover Signing

    NASA Image and Video Library

    2017-10-26

    Meeting in the Launch Control Center of NASA's Kennedy Space Center in Florida, officials of the agency's Spacecraft/Payload Integration and Evolution (SPIE) organization formally turn over processing of the Space Launch System (SLS) rocket's Interim Cryogenic Propulsion Stage (ICPS) to the center's Ground Systems Development and Operations (GSDO) directorate. The ICPS is the first integrated piece of flight hardware to arrive in preparation for the uncrewed Exploration Mission-1. With the Orion attached, the ICPS sits atop the SLS rocket and will provide the spacecraft with the additional thrust needed to travel tens of thousands of miles beyond the Moon.

  16. 18 CFR 366.7 - Procedures for obtaining exempt wholesale generator and foreign utility company status.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... obtaining exempt wholesale generator and foreign utility company status. 366.7 Section 366.7 Conservation of... THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND... Procedures for obtaining exempt wholesale generator and foreign utility company status. (a) Self...

  17. Disclosure of information to organ, tissue and eye procurement organizations. Final rule.

    PubMed

    2008-11-03

    This document adopts, with changes, a Department of Veterans Affairs (VA) interim final rule that implemented provisions of the Veterans Benefits, Health Care, and Information Technology Act of 2006 concerning disclosure of information to organ, tissue and eye procurement organizations. The regulation will provide authority for VA to provide individually-identifiable VA medical records of veterans or dependents of veterans who are deceased or whose death is imminent to representatives of organ procurement organizations, eye banks, and tissue banks to determine whether the patients are suitable potential donors. This document modifies the interim final rule to clarify the definition of "near death" and to correct a grammatical error in the definition of "procurement organization." This document also clarifies that eye bank and tissue bank registration with FDA must have an active status.

  18. Department of Defense Appropriations Act, 2010

    THOMAS, 111th Congress

    Rep. Murtha, John P. [D-PA-12

    2009-07-24

    12/19/2009 Became Public Law No: 111-118. (TXT | PDF) (All Actions) Notes: Because the FY2010 DOD Appropriations Act was approved by both chambers by exchanging different versions of H.R. 3326, no conference report was issued. Section 1014 of the final version provides that the explanatory statement inserted in the Congressional Record on December 16... Tracker: This bill has the status Became LawHere are the steps for Status of Legislation:

  19. 78 FR 57621 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... CONSUMER PRODUCT SAFETY COMMISSION Sunshine Act Meeting TIME AND DATE: Wednesday, September 25..., Maryland. STATUS: Commission Meeting--Open to the public Matters To Be Considered Briefing Matter: Voluntary Recall Notice--Notice of Proposed Rulemaking. [[Page 57622

  20. Joint DOE/EPA Interim Policy Statement on Leasing Under the Hall Amendment

    EPA Pesticide Factsheets

    This page contains a joint statement between the Environmental Protection Agency and the Department of Energy, providing interim policy on processing proposals for leasing DOE real property using the authority in 42 U.S.C. 7256, commonly referred to as the 'Hall Amendment.

  1. PCoD Lite - Using an Interim PCoD Protocol to Assess the Effects of Disturbance Associated with US Navy Exercises on Marine Mammal Populations

    DTIC Science & Technology

    2015-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on

  2. 77 FR 40910 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ..., 500 E Street SW., Washington, DC 20436, Telephone: (202) 205-2000. STATUS: Open to the public. MATTERS... Commission. Lisa R. Barton, Acting Secretary to the Commission. [FR Doc. 2012-17056 Filed 7-9-12; 4:15 pm...

  3. Interim Performance Objectives. Progress Report, 3rd Quarter Fiscal Year 1999.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This document contains a progress report on three categories of interim performance objectives outlined by the Office of Student Financial Assistance (OSFA) in winter 1999. These objectives were to: (1) improve customer service; (2) reduce the overall cost of delivering student aid; and (3) transform the OSFA into a performance-based organization.…

  4. 26 CFR 1.848-3 - Interim rules for certain reinsurance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... before November 15, 1991. (b) Interim rules. In determining a company's gross amount of premiums and... include the same amount in the gross amount of premiums and other consideration under section 848(d)(1)(A... the same amount in the gross amount of premiums and other consideration under section 848(d)(1)(A...

  5. 46 CFR 308.102 - Issuance of interim binder; terms and conditions; fees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... 308.102 Section 308.102 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.102 Issuance of interim binder... the terms, conditions, and warranties contained in the application for war risk hull and disbursements...

  6. 46 CFR 308.102 - Issuance of interim binder; terms and conditions; fees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... 308.102 Section 308.102 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.102 Issuance of interim binder... the terms, conditions, and warranties contained in the application for war risk hull and disbursements...

  7. 46 CFR 308.102 - Issuance of interim binder; terms and conditions; fees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... 308.102 Section 308.102 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.102 Issuance of interim binder... the terms, conditions, and warranties contained in the application for war risk hull and disbursements...

  8. 46 CFR 308.102 - Issuance of interim binder; terms and conditions; fees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... 308.102 Section 308.102 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.102 Issuance of interim binder... the terms, conditions, and warranties contained in the application for war risk hull and disbursements...

  9. 46 CFR 308.102 - Issuance of interim binder; terms and conditions; fees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 308.102 Section 308.102 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.102 Issuance of interim binder... the terms, conditions, and warranties contained in the application for war risk hull and disbursements...

  10. Contribution of postpolymerization conditioning and storage environments to the mechanical properties of three interim restorative materials.

    PubMed

    Thompson, Geoffrey A; Luo, Qing

    2014-09-01

    Because polymer-based interim restorative materials are weak, even well-made restorations sometimes fail before the definitive restoration is ready for insertion. Therefore, knowing which fabrication procedures and service conditions affect mechanical properties is important, particularly over an extended period. The purpose of this study was to evaluate the effect of thermal treatment, surface sealing, thermocycling, storage media, storage temperature, and age on autopolymerizing poly(methylmethacrylate) and bis-acryl interim restorative materials. Outcome measures were flexural strength, Vickers surface microhardness, and impact strength. Flexural strength and microhardness of poly(methylmethacrylate) (Jet Acrylic) and 2 bis-acryl-composite resin (Protemp 3 Garant and Integrity) interim restorative materials were evaluated as affected by storage media, storage temperature, storage time, thermocycling, postpolymerization thermal treatment, or application of a surface sealer. In total, 2880 beam specimens (25×2×2 mm) were fabricated. Mechanical property analyses were made at 10 days, 30 days, 6 months, and 1 year after specimen preparation. Flexural strength was determined by using a 3-point bending test in a universal testing machine with a 1 kN load cell at a crosshead speed of 5.0 mm min(-1). Fracture specimens were recovered and used for determining Vickers microhardness. Measurements were made with a 0.1 N load and 15 second dwell time. Three microhardness measurements were made for each specimen, and the mean was used for reporting Vickers microhardness. Notched impact specimens (64×12.7×6.35 mm) were fabricated from Jet, Protemp 3 Garant, and Integrity interim restorative materials, yielding 288 impact specimens. Impact strengths were assessed at 10 days, 30 days, 6 months, and 1 year with a 2 J pendulum. The effects of the various experimental treatments were determined and rank ordered with analysis of variance, F ratios, and least square means

  11. An Interim Report on Pennsylvania's Framework for Leadership: Frequently Asked Questions

    ERIC Educational Resources Information Center

    Bing-ru, Teh; Chiang, Hanley; Lipscomb, Stephen; Gill, Brian

    2014-01-01

    A new study analyzed data from the 2012/13 pilot of the Framework for Leadership (FFL), Pennsylvania's tool for evaluating the leadership practices of principals and assistant principals. Based on the FFL scores of 336 principals and 69 assistant principals evaluated by their supervisors in the 2012/13 school year, this interim report found that…

  12. The SpringBoard Bursary Foundation Impact Assessment: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Buchanan, Emily; Stevens, Eleanor; Straw, Suzanne

    2014-01-01

    The SpringBoard Bursary Foundation (SpringBoard) commissioned the National Foundation for Education Research (NFER) to undertake an evaluation of its activities and impacts between 2013 and 2018. This interim and summary report presents the findings of the first year of the evaluation. SpringBoard was established in 2012 to transform the lives of…

  13. Evaluation of experimental railroad-highway grade crossings in Louisiana : interim report No. 5.

    DOT National Transportation Integrated Search

    1980-04-01

    This interim report is prepared to provide a review of the performance evaluation exhibited on twenty-three (23) experimental railroad-highway grade-crossing projects in the state of Louisiana. The railroad crossings were installed during a ten-year ...

  14. Defensive efficacy interim design: Dynamic benefit/risk ratio view using probability of success.

    PubMed

    Tang, Zhongwen

    2017-01-01

    Traditional efficacy interim design is based on alpha spending which does not have intuitive interpretation and hence is difficult to communicate with non-statistician colleagues. The alpha-spending approach is based on efficacy alone and hence does not have the flexibility to incorporate newly emerged safety signal. Newly emerged safety signal may nullify the originally set efficacy boundary. In contrast, the probability of success (POS) concept has intuitive interpretation and hence can facilitate our communication with non-statistician colleagues and help to obtain health authority (HA) buying. The success criteria of POS are not restricted to statistical significance. Hence, POS has the capability to incorporate both efficacy and safety information. We propose to use POS and its credible interval to design efficacy interim. In the proposed method, the efficacy boundary is adjustable to offset newly emerged safety signal.

  15. 75 FR 21246 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 11 a.m., May 21, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters to be Considered: Surveillance Matters. [[Page 21247

  16. Status offenses.

    PubMed

    Steinhart, D J

    1996-01-01

    Public policy is unsettled with regard to juvenile status offenders--children who are subject to juvenile court jurisdiction for noncriminal behavior such as running away from home, incorrigibility, truancy, and curfew violation. In 1974, the federal Juvenile Justice and Delinquency Prevention Act initiated a national policy of status offender "deinstitutionalization," supporting the development of community-based treatment programs and prohibiting incarceration of these youths. In the following years, most states embraced this policy, sharply reducing status offender detention levels. This article describes factors that have recently worked to erode the federal and state commitment to a policy of status offender deinstitutionalization. These factors include widespread failure to develop adequate services for youths and families; the tragic deaths of runaway youths; rising fear of juvenile crime; and new statehouse majorities promoting agendas of youth discipline and accountability. The article references recent surveys and press reports on the number of runaways, truants, and curfew violators in the United States. In the author's view, policymakers today are torn between their desire to provide services to at-risk youths and families and public pressure to respond to all forms of youth misbehavior with tough new sanctions, including the incarceration of status offenders.

  17. America's Affordable Health Choices Act of 2009

    THOMAS, 111th Congress

    Rep. Dingell, John D. [D-MI-15

    2009-07-14

    House - 10/14/2009 Placed on the Union Calendar, Calendar No. 168. (All Actions) Notes: For further action, see H.R.3590, which became Public Law 111-148 on 3/23/2010. H.R.3590, often referred to as the Affordable Care Act, is the bill that became the health care reform law. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  18. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  19. 77 FR 22749 - Petition To List 83 Species of Coral as Threatened or Endangered Under the Endangered Species Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... threatened or endangered under the Endangered Species Act (ESA) and to notify the public about future public... Candidate Coral Species Petitioned Under the U.S. Endangered Species Act (Status Review Report) and the draft Management Report for 82 Corals Status Review under the Endangered Species Act: Assessment of...

  20. Testimony of Nationally Representative Groups. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    As the 12th in a series of interim reports prepared for the United States Congress on the metric system, this study was authorized by law to reduce uncertainties concerning the issue of converting to metrication and to provide a better basis upon which the Congress may evaluate and resolve it. The testimony of over 230 nationally representative…

  1. Orion EM-1 Interim Cryogenic Propulsion Stage (ICPS) move from HIF to DOC

    NASA Image and Video Library

    2017-04-12

    The Orion EM-1 Interim Cryogenic Propulsion Stage is moved from the Horizontal Integration Facility (HIF) to the Delta Operations Center (DOC) at Cape Canaveral Air Force Station to continue processing for it's future mission on the Space Launch System rocket.

  2. 78 FR 290 - National Conference on Weights and Measures 98th Interim Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... DEPARTMENT OF COMMERCE National Institute of Standards and Technology National Conference on Weights and Measures 98th Interim Meeting AGENCY: National Institute of Standards and Technology, Commerce... consumer organizations on subjects related to the field of weights and measures technology, administration...

  3. Fabrication of an interim complete removable dental prosthesis with an in-office digital light processing three-dimensional printer: A proof-of-concept technique.

    PubMed

    Lin, Wei-Shao; Harris, Bryan T; Pellerito, John; Morton, Dean

    2018-04-30

    This report describes a proof of concept for fabricating an interim complete removable dental prosthesis with a digital light processing 3-dimensional (3D) printer. Although an in-office 3D printer can reduce the overall production cost for an interim complete removable dental prosthesis, the process has not been validated with clinical studies. This report provided a preliminary proof of concept in developing a digital workflow for the in-office additively manufactured interim complete removable dental prosthesis. Copyright © 2018 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  4. An Inter-Disciplinary Problem Solving Approach to Environmental Education, Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Egan, Thomas A.; Seidel, Janet C.

    Evaluation of an ESEA Title III project, "An Inter-Disciplinary Problem Solving Approach to Environmental Education" located in Berks County, Pennsylvania, is offered in this interim report. The report is primarily concerned with the degree to which operational and management process objectives are being achieved in each of four…

  5. Cost Implications of an Interim Storage Facility in the Waste Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarrell, Joshua J.; Joseph, III, Robert Anthony; Howard, Rob L

    2016-09-01

    This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.

  6. 8 CFR 244.14 - Withdrawal of Temporary Protected Status.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Withdrawal of Temporary Protected Status... TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 244.14 Withdrawal of Temporary Protected... Protected Status under section 244 of the Act at any time upon the occurrence of any of the following: (1...

  7. 8 CFR 244.14 - Withdrawal of Temporary Protected Status.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 8 Aliens and Nationality 1 2011-01-01 2011-01-01 false Withdrawal of Temporary Protected Status... TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 244.14 Withdrawal of Temporary Protected... Protected Status under section 244 of the Act at any time upon the occurrence of any of the following: (1...

  8. 78 FR 45278 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ...) District Commander's overview of current project issues within the Rock Island District; and (3... MISSISSIPPI RIVER COMMISSION Sunshine Act Meeting AGENCY HOLDING THE MEETINGS: Mississippi River... Landing, La Cross, WI STATUS: Open to the public. MATTERS TO BE CONSIDERED: (1) Summary report by...

  9. 75 FR 14429 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 11 a.m., Friday April 23, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-23-10; 11:15 am] BILLING CODE 6351-01-P ...

  10. 75 FR 14429 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 11 a.m., Friday, April 9, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed...-23-10; 11:15 am] BILLING CODE 6351-01-P ...

  11. 75 FR 38087 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-01

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday July 30, 2009. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-29-10; 4:15 pm] BILLING CODE 6351-01-P ...

  12. 75 FR 29995 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., June 18, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS...-10; 4:15 pm] BILLING CODE 6351-01-P ...

  13. 75 FR 7568 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday March 12, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-18-10; 4:15 pm] BILLING CODE 6351-01-P ...

  14. 75 FR 29995 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday, June 4, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-26-10; 4:15 pm] BILLING CODE 6351-01-P ...

  15. 75 FR 29995 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday June 25, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-26-10; 4:15 pm] BILLING CODE 6351-01-P ...

  16. 75 FR 14429 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 11 a.m., Friday, April 2, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-23-10; 4:15 pm] BILLING CODE 6351-01-P ...

  17. 75 FR 14429 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 11 a.m., Friday April 30, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-23-10; 11:15 am] BILLING CODE 6351-01-P ...

  18. 75 FR 38087 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-01

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., July 16, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS...-10; 4:15 pm] BILLING CODE 6351-01-P ...

  19. 75 FR 38086 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-01

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings Time and Date: 11 a.m., Friday, July 2, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed...-29-10; 4:15 pm] BILLING CODE 6351-01-P ...

  20. 75 FR 7568 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday March 5, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-18-10; 4:15 pm] BILLING CODE 6351-01-P ...