Sample records for action project site

  1. CORRECTIVE ACTION DECISION DOCUMENT FOR CORRECTIVE ACTION UNIT 383: AREA 12 E-TUNNEL SITES, NEVADA TEST SITE, REV. NO. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark McLane

    2005-03-01

    This Corrective Action Decision Document (CADD) was prepared by the Defense Threat Reduction Agency (DTRA) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The recommendations and corrective actions described within this document apply to the future closure of Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is a joint DTRA and NNSA/NSO site. The CAU consists of three (3) Corrective Action Sites (CASs): CAS 12-06-06 (Muckpile); CAS 12-25-02 (Oil Spill); and CAS 12-28-02 (Radioactive Material). In addition to these CASs, E-Tunnel Ponds One, Two, and Three, and the Drainage Area above themore » ponds were included since closure of the Muckpile will impact these areas. This CADD is consistent with the requirements of the ''Federal Facility Agreement and Consent Order'' agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The DTRA point of contact is the Nevada Operations Office, Environmental Project Manager; currently Ms. Tiffany A. Lantow. The NNSA/NSO point of contact is the Environmental Restoration, Industrial Sites Project Manager; currently Ms. Janet Appenzeller-Wing. The purpose of this CADD is to identify and provide the rationale for the selection of a recommended corrective action alternative for CAU 383. This document presents the recommended corrective action for CAU 383 (E-Tunnel Sites); however, implementation may be affected by the corrective action (to be determined) for CAU 551 (Area 12 Muckpiles) due to the close proximity of B, C, D, and F-Tunnels. The scope of this CADD consists of the following tasks: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend and

  2. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individualmore » at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.« less

  3. Nevada National Security Site Industrial Sites Project Closeout - 12498

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin; Krauss, Mark; Matthews, Pat

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the endmore » of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the

  4. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values thatmore » have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.« less

  5. Nuclear facility decommissioning and site remedial actions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3)more » Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.« less

  6. Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended correctivemore » action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.« less

  7. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department ofmore » Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.« less

  8. Notification: Evaluation of Time-Critical Removal Actions for Superfund Sites

    EPA Pesticide Factsheets

    Project #OPE-FY15-0019, February 4, 2015. The EPA OIG plans to begin preliminary research on the evaluation of the effectiveness of time-critical removal actions for Superfund sites on February 24, 2015.

  9. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmentalmore » and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.« less

  10. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  11. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequatelymore » attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars.« less

  12. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmentalmore » restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.« less

  13. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Majormore » chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.« less

  14. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less

  15. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bachrach, A.; Hoopes, J.; Morycz, D.

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. Themore » US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.« less

  16. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uraniummore » Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.« less

  17. Corrective Action Investigation Plan for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    2004-06-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental corrective action alternatives. Corrective Action Unit 151 is located in Areas 2, 12, 18, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 151 is comprised of the nine Corrective Action Sites (CAS) listed below: (1) 02-05-01, UE-2ce Pond; (2)more » 12-03-01, Sewage Lagoons (6); (3) 12-04-01, Septic Tanks; (4) 12-04-02, Septic Tanks; (5) 12-04-03, Septic Tank; (6) 12-47-01, Wastewater Pond; (7) 18-03-01, Sewage Lagoon; (8) 18-99-09, Sewer Line (Exposed); and (9) 20-19-02, Photochemical Drain. The CASs within CAU 151 are discharge and collection systems. Corrective Action Site 02-05-01 is located in Area 2 and is a well-water collection pond used as a part of the Nash test. Corrective Action Sites 12-03-01, 12-04-01, 12-04-02, 12-04-03, and 12-47-01 are located in Area 12 and are comprised of sewage lagoons, septic tanks, associated piping, and two sumps. The features are a part of the Area 12 Camp housing and administrative septic systems. Corrective Action Sites 18-03-01 and 18-99-09 are located in the Area 17 Camp in Area 18. These sites are sewage lagoons and associated piping. The origin and terminus of CAS 18-99-09 are unknown; however, the type and configuration of the pipe indicates that it may be a part of the septic systems in Area 18. Corrective Action Site 20-19-02 is located in the Area 20 Camp. This site is comprised of a surface discharge of photoprocessing chemicals.« less

  18. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions;more » (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.« less

  20. Past Project Expo Sites

    EPA Pesticide Factsheets

    This page provides information for Project Expo sites that were featured at the LMOP Conferences in 2013 and 2014. Project Expo sites were featured as being interested in identifying project partners for the development of an LFG energy project.

  1. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilitiesmore » Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626

  2. Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-04-01

    Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluatemore » and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139.« less

  3. Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to themore » FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.« less

  4. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclearmore » explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical

  5. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate andmore » recommend corrective action alternatives.« less

  6. An Action Research Project's Impact on Teachers' Leadership Attitudes and Perceptions

    ERIC Educational Resources Information Center

    Myers, Nancy; Dillard, Benita R.

    2013-01-01

    California Lutheran University is a regional site for the California Reading and Literature Project (CRLP). In 2010, CRLP began a two-year longitudinal study to examine the effects of participating in an institute called Reframing Teacher Leadership: Action Research Study Group had on PreK-12 teachers' attitudes and perceptions. The foundation…

  7. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 383: Area E-Tunnel Sites, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less

  9. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 •more » 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.« less

  10. Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites - Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-12-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs weremore » selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.« less

  11. Closure report for Corrective Action Unit 211, Area 15 EPA Farm waste sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-01

    This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.

  12. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) weremore » evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.« less

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedialmore » Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.« less

  14. Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-07-01

    Corrective Action Unit 106 comprises the four corrective action sites (CASs) listed below: • 05-20-02, Evaporation Pond • 05-23-05, Atmospheric Test Site - Able • 05-45-04, 306 GZ Rad Contaminated Area • 05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viablemore » CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from groundwater pumping during the Radionuclide Migration study program (CAS 05-20-02), a weapons-related airdrop test (CAS 05-23-05), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). The presence and nature of contamination from surface-deposited radiological contamination from CAS 05-23-05, Atmospheric Test Site - Able, and other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) from the remaining three CASs will be evaluated using soil samples collected from the

  15. Corrective Action Investigation Plan for Corrective Action Unit 576: Miscellaneous Radiological Sites and Debris Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit (CAU) 576 is located in Areas 2, 3, 5, 8, and 9 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 576 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 576, which comprises the following corrective action sites (CASs): 00-99-01, Potential Source Material; 02-99-12, U-2af (Kennebec) Surface Rad-Chem Piping; 03-99-20, Area 3 Subsurface Rad-Chem Piping; 05-19-04, Frenchman Flat Rad Waste Dump ; 09-99-08, U-9x (Allegheny) Subsurface Rad-Chem Piping; 09-99-09, U-9its u24more » (Avens-Alkermes) Surface Contaminated Flex Line These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document (CADD).« less

  16. Guidance on Initial Site Assessment at Corrective Action Sites

    EPA Pesticide Factsheets

    Guidance to be used to conduct Corrective Action site assessment efforts. Informs Resource Conservation and Recovery Act (RCRA) permit writers and enforcement officials of procedures to be used in conducting RCRA Facility Assessments.

  17. Addendum to the Closure Report for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site

  18. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document.more » The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed

  19. Addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are

  20. Corrective Action Investigation Plan for Corrective Action Unit 224: Decon Pad and Septic Systems Nevada Test Site, Nevada, Rev. No.: 0, with ROTC 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 224: Decon Pad and Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 224 is comprised of themore » nine Corrective Action Sites (CASs) listed below: 02-04-01, Septic Tank (Buried); 03-05-01, Leachfield; 05-04-01, Septic Tanks (4)/Discharge Area; 06-03-01, Sewage Lagoons (3); 06-05-01, Leachfield; 06-17-04, Decon Pad and Wastewater Catch; 06-23-01, Decon Pad Discharge Piping; 11-04-01, Sewage Lagoon; and 23-05-02, Leachfield. Corrective Action Sites 06-05-01, 06-23-01, and 23-05-02 were identified in the 1991 Reynolds Electrical & Engineering Co., Inc. (REECo) inventory (1991). The remaining sites were identified during review of various historical documents. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting a corrective action alternative for each CAS. The CAI will include field inspections, radiological and geological surveys, and sample collection. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.« less

  1. Environmental Assessment of Ground Water Compliance at the Durango, Colorado, UMTRA Project Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2002-11-29

    The U.S. Department of Energy (DOE) is proposing a ground water compliance strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Durango, Colorado. DOE has prepared this environmental assessment to provide the public with information concerning the potential effects of this proposed strategy.

  2. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was

  3. Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained bymore » conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.« less

  4. Leadership for ethical policy and practice (LEPP): participatory action project.

    PubMed

    Storch, Janet; Rodney, Patricia; Varcoe, Colleen; Pauly, Bernadette; Starzomski, Rosalie; Stevenson, Lynne; Best, Lynette; Mass, Heather; Fulton, Thomas Reilly; Mildon, Barbara; Bees, Fiona; Chisholm, Anne; MacDonald-Rencz, Sandra; McCutcheon, Amy Sanchez; Shamian, Judith; Thompson, Charlotte; Makaroff, Kara Schick; Newton, Lorelei

    2009-01-01

    Within Canada's fast-paced, ever-changing healthcare environment, providers are experiencing difficulty practising according to their professional ethical standards, leading many to experience moral or ethical distress. Limited attention has been paid to improvements in the ethical climate in healthcare settings in research focusing on nurses' workplaces. In this three-year study, we focused on how the ethical climate in healthcare delivery can be improved and how the use of participatory action research methods can lead to continued enhancements and lasting changes in services delivery. Together, we developed strategies for taking action, aimed at improving the quality of the work environment. This action involved both nurses in direct care and those in key leadership positions (CNOs or their equivalents). Through the active participation of those for whom the research-based change was intended, these strategies were tested in various sites across British Columbia and can be used as templates or designs for use in other settings. A key component of the success of the projects and action plans that were created was the integral involvement of nurse leaders through all phases.

  5. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pastor, Laura

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada,more » and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a

  6. Corrective Action Investigation Plan for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada (Rev. 0 / June 2003), Including Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less

  7. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  8. An Action-Research Project: Community Lead Poisoning Prevention

    ERIC Educational Resources Information Center

    Rajaram, Shireen S.

    2007-01-01

    This action-research project focused on gathering data on awareness of lead poisoning, as well as disseminating information on lead poisoning prevention in a metropolitan midwestern city. This project reflects an action-research approach to service learning and was in collaboration with a grass-roots organization. This paper outlines the daunting…

  9. Addendum to the Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove

  10. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  11. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  13. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  14. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  15. Corrective Action Investigation Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-08-01

    CAU 104 comprises the 15 CASs listed below: (1) 07-23-03, Atmospheric Test Site T-7C; (2) 07-23-04, Atmospheric Test Site T7-1; (3) 07-23-05, Atmospheric Test Site; (4) 07-23-06, Atmospheric Test Site T7-5a; (5) 07-23-07, Atmospheric Test Site - Dog (T-S); (6) 07-23-08, Atmospheric Test Site - Baker (T-S); (7) 07-23-09, Atmospheric Test Site - Charlie (T-S); (8) 07-23-10, Atmospheric Test Site - Dixie; (9) 07-23-11, Atmospheric Test Site - Dixie; (10) 07-23-12, Atmospheric Test Site - Charlie (Bus); (11) 07-23-13, Atmospheric Test Site - Baker (Buster); (12) 07-23-14, Atmospheric Test Site - Ruth; (13) 07-23-15, Atmospheric Test Site T7-4; (14) 07-23-16,more » Atmospheric Test Site B7-b; (15) 07-23-17, Atmospheric Test Site - Climax These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 28, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 104. The releases at CAU 104 consist of surface-deposited radionuclides from 30 atmospheric nuclear tests. The presence and nature of contamination at CAU 104 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a

  16. Community Action Projects: Applying Biotechnology in the Real World

    ERIC Educational Resources Information Center

    Nguyen, Phuong D.; Siegel, Marcelle A.

    2015-01-01

    Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…

  17. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  18. Site Rehabilitation Completion Report with No Further Action Proposal for the Northeast Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daniel, Joe; Tabor, Charles; Survochak, Scott

    2013-05-01

    The purpose of this Site Rehabilitation Completion Report is to present the post-active-remediation monitoring results for the Northeast Site and to propose No Further Action with Controls. This document includes information required by Chapter 62-780.750(4)(d), 62-780.750(6), and 62-780.600(8)(a)27 Florida Administrative Code (F.A.C.). The Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site (DOE 2009a) describes the approach for post-active-remediation monitoring. The Young - Rainey Science, Technology, and Research Center (STAR Center) is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 99-acre STAR Center is located in Largo, Florida. The Northeast Site is locatedmore » in the northeast corner of the STAR Center. The Northeast Site meets all the requirements for an RMO II closure—No Further Action with Controls. DOE is nearing completion of a restrictive covenant for the Northeast Site. DOE has completed post-active-remediation monitoring at the Northeast Site as of September 2012. No additional monitoring will be conducted.« less

  19. Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are locatedmore » in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262

  20. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The correctivemore » action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.« less

  1. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  2. Closure Report for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the

  3. Site action, environmental justice and an urban community: A unique approach at a Superfund site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seppi, P.K.; Richman, L.R.; Wireman, J.M.

    1994-12-31

    The US Environmental Protection Agency`s (EPA) project at the Diamond Alkali Superfund Site is an example of how technical, environmental justice, and community relations issues all affect actions at a Superfund Site. The Diamond Alkali Superfund Site is divided into two operable units. The site consists of the former pesticides manufacturing facility at 80 and 120 Lister Avenue in Newark, New Jersey, and the adjoining six mile reach of the Passaic River known as the ``Passaic River Study Area``. EPA has negotiated Consent Orders with the Potentially Responsible Party (PRP) to design and construct the selected containment remedy at themore » land-based properties, and to conduct the Remedial Investigation (RI) of the river under EPA oversight. Pesticides, dioxin, polychlorinated biphenyls (PCBs), metals and other hazardous substances have been found at the Site. Evidence indicates that the ecology of the Passaic River has been adversely impacted by the presence of these hazardous substances. The State of New Jersey issued a ban on the consumption of fish and crabs from affected sections of the Passaic River; yet reportedly, many residents still consume seafood from the river. Community relations at the Site had deteriorated because of the community`s lack of trust and loss of confidence in EPA. To address these issues, EPA has implemented an innovative public outreach program to improve how it communicates with racial minority and low-income communities living in the vicinity of the Site, and to involve them in the decision-making process.« less

  4. Corrective Action Investigation Plan for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews; Christy Sloop

    2012-02-01

    Corrective Action Unit (CAU) 569 is located in Area 3 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 569 comprises the nine numbered corrective action sites (CASs) and one newly identified site listed below: (1) 03-23-09, T-3 Contamination Area (hereafter referred to as Annie, Franklin, George, and Moth); (2) 03-23-10, T-3A Contamination Area (hereafter referred to as Harry and Hornet); (3) 03-23-11, T-3B Contamination Area (hereafter referred to as Fizeau); (4) 03-23-12, T-3S Contamination Area (hereafter referred to as Rio Arriba); (5) 03-23-13, T-3T Contamination Area (hereafter referred tomore » as Catron); (6) 03-23-14, T-3V Contamination Area (hereafter referred to as Humboldt); (7) 03-23-15, S-3G Contamination Area (hereafter referred to as Coulomb-B); (8) 03-23-16, S-3H Contamination Area (hereafter referred to as Coulomb-A); (9) 03-23-21, Pike Contamination Area (hereafter referred to as Pike); and (10) Waste Consolidation Site 3A. Because CAU 569 is a complicated site containing many types of releases, it was agreed during the data quality objectives (DQO) process that these sites will be grouped. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the DQOs developed on September 26, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The

  5. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 516: SEPTIC SYSTEMS AND DISCHARGE POINTS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA; U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2005-08-01

    Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, is listed in the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). CAU 516 consists of six Corrective Action Sites (CASs) located in Areas 3, 6, and 22 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 516 is comprised of the following six CASs: (1) 03-59-01 Building 3C-36 Septic System; (2) 03-59-02 Building 3C-45 Septic System; (3) 06-51-01 Sump and Piping; (4) 06-51-02 Clay Pipe and Debris; (5) 06-51-03 Clean-Out Box and Piping; and (6)more » 22-19-04 Vehicle Decontamination Area. Details on site history and site characterization results for CAU 516 are provided in the approved Corrective Action Investigation Plan (CAIP), (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003), and the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2004).« less

  6. Disease management projects and the Chronic Care Model in action: baseline qualitative research.

    PubMed

    Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland

    2012-05-11

    Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served

  7. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less

  8. Critical Literacy for School Improvement: An Action Research Project

    ERIC Educational Resources Information Center

    Cooper, Karyn; White, Robert E.

    2008-01-01

    This article provides an overview of the integrative process of initiating an action research project on literacy for students "at risk" in a Canadian urban elementary school. As the article demonstrates, this requires development of a school-wide framework, which informs the action research project and desired outcomes, and a shared…

  9. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, southmore » of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  10. Quantitative evaluation of intensive remedial action using long-term monitoring and tracer data at a DNAPL contaminated site, Wonju, Korea

    NASA Astrophysics Data System (ADS)

    Lee, S. S.; Kim, H. J.; Kim, M. O.; Lee, K.; Lee, K. K.

    2016-12-01

    A study finding evidence of remediation represented on monitoring data before and after in site intensive remedial action was performed with various quantitative evaluation methods such as mass discharge analysis, tracer data, statistical trend analysis, and analytical solutions at DNAPL contaminated site, Wonju, Korea. Remediation technologies such as soil vapor extraction, soil flushing, biostimulation, and pump-and-treat have been applied to eliminate the contaminant sources of trichloroethylene (TCE) and to prevent the migration of TCE plume from remediation target zones. Prior to the remediation action, the concentration and mass discharges of TCE at all transects were affected by seasonal recharge variation and residual DNAPLs sources. After the remediation, the effect of remediation took place clearly at the main source zone and industrial complex. By tracing a time-series of plume evolution, a greater variation in the TCE concentrations was detected at the plumes near the source zones compared to the relatively stable plumes in the downstream. The removal amount of the residual source mass during the intensive remedial action was estimated to evaluate the efficiency of the intensive remedial action using analytical solution. From results of quantitative evaluation using analytical solution, it is assessed that the intensive remedial action had effectively performed with removal efficiency of 70% for the residual source mass during the remediation period. Analytical solution which can consider and quantify the impacts of partial mass reduction have been proven to be useful tools for quantifying unknown contaminant source mass and verifying dissolved concentration at the DNAPL contaminated site and evaluating the efficiency of remediation using long-term monitoring data. Acknowledgement : This subject was supported by the Korea Ministry of Environment under "GAIA project (173-092-009) and (201400540010)", R&D Project on Enviornmental Management of Geologic CO

  11. Corrective Action Investigation Plan for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada (Rev. No.: 0) includes Record of Technical Change No. 1 (dated 9/17/2002)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IT Corporation, Las Vegas, NV

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 5 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 5 consists of eight Corrective Action Sites (CASs): 05-15-01, Sanitary Landfill; 05-16-01, Landfill; 06-08-01, Landfill; 06-15-02, Sanitary Landfill; 06-15-03, Sanitary Landfill; 12-15-01, Sanitary Landfill; 20-15-01, Landfill; 23-15-03, Disposal Site. Located between Areas 5, 6, 12, 20, and 23 of the Nevada Test Site (NTS), CAU 5 consists of unlined landfillsmore » used in support of disposal operations between 1952 and 1992. Large volumes of solid waste were produced from the projects which used the CAU 5 landfills. Waste disposed in these landfills may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present at concentrations and locations that could potentially pose a threat to human health and/or the environment. During the 1992 to 1995 time frame, the NTS was used for various research and development projects including nuclear weapons testing. Instead of managing solid waste at one or two disposal sites, the practice on the NTS was to dispose of solid waste in the vicinity of the project. A review of historical documentation, process knowledge, personal interviews, and inferred activities associated with this CAU identified the following as potential contaminants of concern: volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, pesticides, petroleum hydrocarbons (diesel- and gasoline-range organics), Resource Conservation and Recovery Act Metals, plus nickel and zinc. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution

  12. Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-06-27

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field

  13. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    PubMed Central

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved

  14. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodatemore » the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.« less

  15. Peer Observation Action Research Project

    ERIC Educational Resources Information Center

    Sandt, Fred-Ole

    2012-01-01

    This paper outlines the initial findings of an action research project that focuses on the possible contribution of peer observation to a more collaborative environment and teachers' professional growth at The University High School. The research component played a significant part as previous attempts to change the culture at the school were…

  16. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  17. Administrative Leadership as Projection, Social Control, and Action.

    ERIC Educational Resources Information Center

    Reed, Donald B.

    Over the past 50 years, theoretical and methodological problems have plagued the study of leadership. This paper, proposing an alternative theory, argues that leadership has three fundamental components: projection and social control, which are linked by action. Projection is the visualization of a project to be completed. Educational…

  18. Addendum to the Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a

  19. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  20. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  1. Corrective Action Decision Document for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2008-02-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas 3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: •03-04-02, Area 3 Subdock Septic Tank •03-59-05, Area 3 Subdock Cesspool •12-59-01, Drilling/Welding Shop Septic Tanks •12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a correctivemore » action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: •CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. •CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.« less

  2. Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditchmore » flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.« less

  3. Corrective Action Decision Document for Corrective Action Unit 568. Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for the 14 CASs within CAU 568. Corrective action investigation (CAI) activities were performed from April 2014 through May 2015, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. The purpose of the CAI was to fulfill data needs as defined during themore » DQO process. The CAU 568 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated that the dataset is complete and acceptable for use in fulfilling the DQO data needs. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 14 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 568: • No further action is the preferred corrective action for CASs 03-23-17, 03-23-22, 03-23-26. • Closure in place is the preferred corrective action for CAS 03-23-19; 03-45-01; the SE DCBs at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; and the Pascal-BHCA at CAS 03-23-31. • Clean closure is the preferred corrective action for CASs 03-08-04, 03-23-30, and 03-26-04; and the four well head covers at CASs 03-23-20, 03-23-23, 03-23-31, and 03-23-33.« less

  4. Corrective Action Plan for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 366, Area 11 Plutonium Valley Dispersion Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996 as amended). CAU 366 consists of the following six Corrective Action Sites (CASs) located in Area 11 of the Nevada National Security Site: · CAS 11-08-01, Contaminated Waste Dump #1 · CAS 11-08-02, Contaminated Waste Dump #2 · CAS 11-23-01, Radioactively Contaminated Area A · CAS 11-23-02, Radioactively Contaminated Area B · CAS 11-23-03, Radioactively Contaminated Area C · CAS 11-23-04, Radioactively Contaminated Area D Site characterization activities weremore » performed in 2011 and 2012, and the results are presented in Appendix A of the Corrective Action Decision Document (CADD) for CAU 366 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2012a). The following closure alternatives were recommended in the CADD: · No further action for CAS 11-23-01 · Closure in place for CASs 11-08-01, 11-08-02, 11-23-02, 11-23-03, and 11-23-04 The scope of work required to implement the recommended closure alternatives includes the following: · Non-engineered soil covers approximately 3 feet thick will be constructed at CAS 11-08-01 over contaminated waste dump (CWD) #1 and at CAS 11-08-02 over CWD #2. · FFACO use restrictions (URs) will be implemented for the areas where the total effective dose (TED) exceeds the final action level (FAL) of 25 millirems per Occasional Use Area year (mrem/OU-yr). The FAL is based on an assumption that the future use of the site includes occasional work activities and that workers will not be assigned to the area on a regular basis. A site worker under this scenario is assumed to be on site for a maximum of 80 hours per year for 5 years. The FFACO UR boundaries will encompass the areas where a worker would be exposed to 25 millirems of radioactivity per year if they are present

  5. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  6. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less

  7. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 squaremore » miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.« less

  8. Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAsmore » and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.« less

  9. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the August 2001, Corrective Action Decision Document / Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 22-99-05, Fuel Storage Area. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR

  10. Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada with ROTC1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2008-05-01

    Corrective Action Unit (CAU) 560 is located in Areas 3 and 6 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 560 is comprised of the seven corrective action sites (CASs) listed below: • 03-51-01, Leach Pit • 06-04-02, Septic Tank • 06-05-03, Leach Pit • 06-05-04, Leach Bed • 06-59-03, Building CP-400 Septic System • 06-59-04, Office Trailer Complex Sewage Pond • 06-59-05, Control Point Septic System These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend correctivemore » action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 22, 2008, by representatives from the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 560.« less

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sloop, Christy

    2013-04-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supportingmore » the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.« less

  12. Corrective Action Decision Document for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada: Revision 0, Including Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-01

    This Corrective Action Decision Document identifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's corrective action alternative recommendation for each of the corrective action sites (CASs) within Corrective Action Unit (CAU) 204: Storage Bunkers, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. An evaluation of analytical data from the corrective action investigation, review of current and future operations at each CAS, and a detailed comparative analysis of potential corrective action alternatives were used to determine the appropriate corrective action for each CAS. There are six CASs in CAU 204, which aremore » all located between Areas 1, 2, 3, and 5 on the NTS. The No Further Action alternative was recommended for CASs 01-34-01, 02-34-01, 03-34-01, and 05-99-02; and a Closure in Place with Administrative Controls recommendation was the preferred corrective action for CASs 05-18-02 and 05-33-01. These alternatives were judged to meet all requirements for the technical components evaluated as well as applicable state and federal regulations for closure of the sites and will eliminate potential future exposure pathways to the contaminated media at CAU 204.« less

  13. Crustal Dynamics Project: Catalogue of site information

    NASA Technical Reports Server (NTRS)

    Noll, Carey E. (Editor)

    1988-01-01

    This document represents a catalog of site information for the Crustal Dynamics Project. It contains information on and descriptions of those sites used by the Project as observing stations for making the precise geodetic measurements necessary for studies of the Earth's crustal movements and deformation.

  14. Crustal Dynamics Project: Catalogue of site information

    NASA Technical Reports Server (NTRS)

    1985-01-01

    This document represents a catalogue of site information for the Crustal Dynamics Project. It contains information and descriptions of those sites used by the Project as observing stations for making the precise geodetic measurements useful for studies of the Earth's crustal movements and deformation.

  15. Give Water a Hand. School Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation at a school site, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  16. Corrective Action Investigation Plan for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada, July 2002, Rev. No. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 140 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 140 consists of nine Corrective Action Sites (CASs): 05-08-01, Detonation Pits; 05-08-02, Debris Pits; 05-17-01, Hazardous Waste Accumulation Site (Buried); 05-19-01, Waste Disposal Site; 05-23-01, Gravel Gertie; 05-35-01, Burn Pit; 05-99-04, Burn Pit; 22-99-04, Radioactive Waste Dump; 23-17-01, Hazardous Waste Storage Area. All nine of these CASs are located withinmore » Areas 5, 22, and 23 of the Nevada Test Site (NTS) in Nevada, approximately 65 miles northwest of Las Vegas. This CAU is being investigated because disposed waste may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. The NTS has been used for various research and development projects including nuclear weapons testing. The CASs in CAU 140 were used for testing, material storage, waste storage, and waste disposal. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will determine if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels. This data will be evaluated at all CASs. Phase II will determine the extent of the contaminant(s) of concern (COCs). This data will only be evaluated for CASs with a COC identified during Phase I. Based on process knowledge, the COPCs for CAU 140 include volatile organics, semivolatile organics, petroleum hydrocarbons, explosive

  17. Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri. Environmental assessment: Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacDonell, M.M.; Peterson, J.M.

    1991-11-01

    The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this timemore » has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impact associated with the proposed action.« less

  18. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    PubMed

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  19. Geospatial Optimization of Siting Large-Scale Solar Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Macknick, Jordan; Quinby, Ted; Caulfield, Emmet

    2014-03-01

    Recent policy and economic conditions have encouraged a renewed interest in developing large-scale solar projects in the U.S. Southwest. However, siting large-scale solar projects is complex. In addition to the quality of the solar resource, solar developers must take into consideration many environmental, social, and economic factors when evaluating a potential site. This report describes a proof-of-concept, Web-based Geographical Information Systems (GIS) tool that evaluates multiple user-defined criteria in an optimization algorithm to inform discussions and decisions regarding the locations of utility-scale solar projects. Existing siting recommendations for large-scale solar projects from governmental and non-governmental organizations are not consistent withmore » each other, are often not transparent in methods, and do not take into consideration the differing priorities of stakeholders. The siting assistance GIS tool we have developed improves upon the existing siting guidelines by being user-driven, transparent, interactive, capable of incorporating multiple criteria, and flexible. This work provides the foundation for a dynamic siting assistance tool that can greatly facilitate siting decisions among multiple stakeholders.« less

  20. Addendum to the Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using

  1. Fall Protection Procedures for Sealing Bulk Waste Shipments by Rail Cars at Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites - 13509

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boyle, J.D.; Fort, E. Joseph; Lorenz, William

    2013-07-01

    Rail-cars loaded with radioactive materials must be closed and fastened to comply with United States Department of Transportation (DOT) requirements before they shipped. Securing waste shipments in a manner that meets these regulations typically results in the use of a sealable rail-car liner. Workers accessing the tops of the 2.74 m high rail-cars to seal and inspect liners for compliance prior to shipment may be exposed to a fall hazard. Relatively recent revisions to the Fall Protection requirements in the Safety and Health Requirements Manual (EM385-1-1, U.S. Army Corps of Engineers) have necessitated modifications to the fall protection systems previouslymore » employed for rail-car loading at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In response these projects have developed site-specific procedures to protect workers and maintain compliance with the improved fall protection regulations. (authors)« less

  2. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alfred Wickline

    2009-04-01

    Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Buildingmore » 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate

  3. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closedmore » by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action

  4. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  5. California Freshwater Shrimp Project: An Eco-Action Project with Real Life Learning.

    ERIC Educational Resources Information Center

    Rogers, Laurette H.

    The California Freshwater Shrimp Project is an example of a student-initiated, eco-action project. Students, from a fourth grade class in the Ross Valley School District in San Rafael, California, were linked to their community and environment through their work in rehabilitating habitat and educating the public. The paper gives an overview of a…

  6. Risk Assessment Approach for the Hanford Site River Corridor Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomson, J.E.; Weiss, S.G.; Sands, J.P.

    2007-07-01

    The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees

  7. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 106: Area 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews and Dawn Peterson

    2011-09-01

    Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting

  9. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  10. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse

    PubMed Central

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus “alcohol culture.” Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one’s community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923

  11. Action Research Projects in Pre-Service Teacher Education

    ERIC Educational Resources Information Center

    Clayton, Courtney; Meadows, George

    2013-01-01

    Classroom-centered Action Research Projects are an integral component of the M.S. in Elementary Education Program at the University's (pseudonym) College of Education. This article provides a summary and discussion of the projects completed by students in the Science, Technology, Literacy and English Language Learner Specializations of the…

  12. Corrective Action Decision Document/Closure Report for Corrective Action Unit 274: Septic Systems, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-09-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated

  13. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs

  14. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. Themore » DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.« less

  15. The Biodiversity Community Action Project: An STS Investigation

    ERIC Educational Resources Information Center

    Aidin, Amirshokoohi; Mahsa, Kazempour

    2010-01-01

    The Biodiversity Community Action Project is a stimulating and vigorous project that allows students to gain an in-depth understanding of the interconnection between organisms and their environments as well as the connection of science to their lives and society. It addresses key content standards in the National Science Education Standards and…

  16. Getting to social action: the Youth Empowerment Strategies (YES!) project.

    PubMed

    Wilson, Nance; Minkler, Meredith; Dasho, Stefan; Wallerstein, Nina; Martin, Anna C

    2008-10-01

    This article describes the social action component of the Youth Empowerment Strategies (YES!) project funded by the Centers for Disease Control and Prevention through its community-based prevention research (CBPR) initiative. YES! is designed to promote problem-solving skills, social action, and civic participation among underserved elementary and middle school youth. The after-school program focuses on identifying and building youths' capacities and strengths as a means of ultimately decreasing rates of alcohol, tobacco, and other drug use and other risky behaviors. The article discusses the conceptual models of risk and intervention and factors contributing to successful social action work, including group dynamics, intragroup leadership, facilitator skills, and school-community contexts. Attention is focused on how the nature of the projects themselves played a key role in determining the likelihood of experiencing success. Implications and recommendations for other youth-focused empowerment education projects are discussed, including the effective use of Photovoice in such projects.

  17. Superfund Record of Decision (EPA Region 5): Allied Chemical/Ironton Coke Site, Ironton, Ohio (second remedial action) September 1988. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-09-29

    The Allied Chemical site is located in the City of Ironton, Lawrence County, Ohio. The remedial action addresses the Goldcamp Disposal Area (GDA) operable unit of the site. The GDA was a sand and gravel pit used for disposal of various chemical wastes from three sources between 1945 and 1977. In 1977, Allied decided to discontinue use of the GDA for disposal of chemical wastes. Allied and its contractor, in consultation with the Ohio Environmental Protection Agency (OEPA), completed a closure project at the site in August 1980, which involved removal of standing liquids and filling and capping the sitemore » with clay. Subsequent hydrogeologic and water-quality investigations indicated that there is ground-water contamination at the site which may pose a threat to public health through migration. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, other organics including phenols and PAHs, and inorganics including cyanide. The selected remedial action for the site is included.« less

  18. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Undrground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in

  19. Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs

  20. realfriends: A Student Social Action Project

    ERIC Educational Resources Information Center

    Van Zoost, Steven

    2012-01-01

    "realfriends" is a social action project created by Grade 12 English students in Windsor, Nova Scotia. Its purpose was to create a face-to-face social network that would help change the school climate into a more social space. Interest in socializing is nothing new for teenagers, but these students articulated a worry that people their…

  1. Formerly Utilized Sites Remedial Action Program (FUSRAP) Hazelwood Interim Storage Site annual site environmental report. Calendar year 1985. [FUSRAP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-04-01

    The Hazelwood Interim Storage Site (HISS) is presently used for the storage of low-level radioactively contaminated soils. Monitoring results show that the HISS is in compliance with DOE concentration guides and radiation protection standards. Derived Concentration Guides (DCGs) represent the concentrations of radionuclides in air or water that would limit the radiation dose to 100 mrem/y. The applicable limits have been revised since the 1984 environmental monitoring report was published. The limits applied in 1984 were based on a radiation protection standard of 500 mrem/y; the limits applied for 1985 are based on a standard of 100 mrem/y. The HISSmore » is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where low-level radioactive contamination remains from the early years of the nation's atomic energy program. To determine whether the site is in compliance with DOE standards, environmental measurements are expressed as percentages of the applicable DCG, while the calculated doses to the public are expressed as percentages of the applicable radiation protection standard. The monitoring program at the HISS measures uranium, radium, and thorium concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; and external gamma radiation exposure rates. Potential radiation doses to the public are also calculated. The HISS was designated for remedial action under FUSRAP because radioactivity above applicable limits was found to exist at the site and its vicinity. Elevated levels of radiation still exist in areas where remedial action has not yet been completed.« less

  2. Examples of actions that improve partnering cooperation among the participants of construction projects

    NASA Astrophysics Data System (ADS)

    Radziszewska-Zielina, E.; Szewczyk, B.

    2017-10-01

    The aim of the article is to present examples of actions that can be undertaken in order to improve partnering cooperation in construction projects. These actions are a practical supplementation to the previously developed fuzzy system of controlling partnering relations in construction projects. The actions relate to 18 parameters of partnering relations that describe cooperation between a general contractor or a company that manages the project and four other participants: the contractors (subcontractors), the designer, the material and equipment suppliers and the real estate developer. The actions have been listed based on a review of subject literature, self-analysis, as well as interviews with participants of construction projects. They can provide examples of good practices that maintain partnering cooperation at a high level. Good cooperation, in turn, translates into a better performance of the project.

  3. Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2010-03-01

    Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: • 25-23-22, Contaminated Soils Site • 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Correctivemore » Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was

  4. Participatory Evaluation with Youth Leads to Community Action Project

    ERIC Educational Resources Information Center

    Ashton, Carolyn; Arnold, Mary E.; Wells, Elissa E.

    2010-01-01

    4-H has long emphasized the importance of civic engagement and community service for positive youth development. One pathway to this ideal is youth action research and evaluation. This article demonstrates how participatory youth research and evaluation can lead to the successful implementation of community action projects. It describes the…

  5. Culminating Experience Action Research Projects, Volume 2, Fall 2002.

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S., Ed.

    As part of the graduate teacher licensure program at the University of Tennessee at Chattanooga, candidates are required to complete an action research project during a course that coincides with the student teaching experience. The syllabus for the course, "Education 590 Culminating Experience," is included, followed by action research projects…

  6. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    NASA Astrophysics Data System (ADS)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  7. Corrective Action Decision Document for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Rev. No. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert Boehlecke

    2004-04-01

    The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activitiesmore » conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation. The scope of this CADD consists of the following: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for each CAS within CAU 204.« less

  8. Northeast Oregon Hatchery Project, Final Siting Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and directmore » release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.« less

  9. Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barber, Brenda; Honerlah, Hans; O'Neill, Mike

    2012-07-01

    include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)« less

  10. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  11. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads,more » drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.« less

  12. From Results to Action - Implementing an Indoor Air Quality Pilot Project

    NASA Astrophysics Data System (ADS)

    Collier, A. M.; Ware, G. E.; Iwasaki, P. G.; Billingsley, L. R.; Main, D.; Hannigan, M.; Pfotenhauer, D.

    2016-12-01

    One of the key differences between community-based participatory research (CBPR) and more conventional scientific research is the expectation that a project does not end with finalized results, but rather with taking action based on those results. Using an indoor air quality pilot project as an example, we will discuss how the consideration of potential actions and applications for the project findings should be integrated into planning throughout the life of a project. We will also share general reflections on effective CBPR from the perspective of both science and community partners on the project. In 2015, Taking Neighborhood Health to Heart (TNH2H), a community-based organization in Northeast Denver, researchers from the University of Colorado, Boulder, and AGU's Thriving Earth Exchange partnered to conduct a pilot project investigating indoor air quality in a Denver community. This partnership formed in response to community concerns about potential environmental contamination from dry cleaning operations, specifically through spills of the compound perchloroethylene. The exploration of the presence of radon, another indoor air quality concern common across the state of Colorado, was also added to the project. Using an iterative process, the team designed a sampling plan, selected a target location, and recruited homes and residents to participate in the pilot project. Radon and perchloroethylene data were then collected in 15 homes. Following data collection, results were first shared with project participants, after which de-identified data were shared with the members of TNH2H. Together TNH2H and researchers then developed strategies for public dissemination of the project findings. While we did not find levels of percholorethylene above the `action level' in any of the participating homes; however, we did find more frequent occurrences of radon levels above the `action level' than we had anticipated. For example, 80% of the homes in our study had radon

  13. 40 CFR 192.04 - Corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Corrective action. 192.04 Section 192... Corrective action. If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into...

  14. 40 CFR 192.04 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Corrective action. 192.04 Section 192... Corrective action. If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into...

  15. Corrective Action Investigation Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, with Errata Sheet, Revision 0 (in English; Afrikaans)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alfred Wickline

    Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: • 03-04-02, Area 3 Subdock Septic Tank • 03-59-05, Area 3 Subdock Cesspool • 12-59-01, Drilling/Welding Shop Septic Tanks • 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective actionmore » investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less

  16. Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada: Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 252: Area 25 Engine Test Stand 1 Decontamination Pad, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less

  18. Corrective Action Investigation Plan for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest ofmore » Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less

  19. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less

  20. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less

  1. Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine

  2. An evaluated community action project on alcohol.

    PubMed

    Casswell, S; Gilmore, L

    1989-07-01

    This article reports outcomes of an evaluated community action program directed toward alcohol problem prevention. In a quasi-experimental design, change was monitored in six cities--two cities with an alcohol-focused community organizer and media campaign, two cities with the media campaign only and two reference cities. The community organizers worked with a local alcohol coordinating committee and other local organizations. They focused on alcohol availability (including the promotion of nonalcoholic beverages), advertising and, to a lesser extent, pricing policies. The media campaign focused on reducing the large-quantity drinking of young men, and generated considerable controversy. Before and after surveys of the general population were carried out to evaluate the outcome of the project. Support for control policies on advertising, availability and price held steady in the treatment communities but dropped in the reference communities. The perception of alcohol being essential to entertaining and as being relatively innocuous decreased significantly in the community-action cities. The project thus appears to have met its objectives in these areas, although primarily by stemming the national trend toward greater support for liberalization.

  3. Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krause

    2010-08-01

    This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drainmore » • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus

  4. Site of anticonvulsant action on sodium channels: autoradiographic and electrophysiological studies in rat brain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Worley, P.F.; Baraban, J.M.

    1987-05-01

    The anticonvulsants phenytoin and carbamazepine interact allosterically with the batrachotoxin binding site of sodium channels. In the present study, we demonstrate an autoradiographic technique to localize the batrachotoxin binding site on sodium channels in rat brain using (/sup 3/H)batrachotoxinin-A 20-alpha-benzoate (BTX-B). Binding of (/sup 3/H)BTX-B to brain sections is dependent on potentiating allosteric interactions with scorpion venom and is displaced by BTX-B (Kd approximately 200 nM), aconitine, veratridine, and phenytoin with the same rank order of potencies as described in brain synaptosomes. The maximum number of (/sup 3/H)BTX-B binding sites in forebrain sections also agrees with biochemical determinations. Autoradiographic localizationsmore » indicate that (/sup 3/H)BTX-B binding sites are not restricted to cell bodies and axons but are present in synaptic zones throughout the brain. For example, a particularly dense concentration of these sites in the substantia nigra is associated with afferent terminals of the striatonigral projection. By contrast, myelinated structures possess much lower densities of binding sites. In addition, we present electrophysiological evidence that synaptic transmission, as opposed to axonal conduction, is preferentially sensitive to the action of aconitine and veratridine. Finally, the synaptic block produced by these sodium channel activators is inhibited by phenytoin and carbamazepine at therapeutic anticonvulsant concentrations.« less

  5. Conducting Site and Economic Renewable Energy Project Feasibility Assessments

    EPA Pesticide Factsheets

    The Toolbox for Renewable Energy Project Development's Conducting Site and Economic Renewable Energy Project Feasibility Assessments page provides tools and resources to evaluate solar project feasibility and economics that influence project development.

  6. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  7. DOUBLE TRACKS Test Site interim corrective action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarilymore » of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.« less

  8. Corrective Action Investigation Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nevada with ROTCs 1, 2, and 3 (Revision 0, September 2000)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrews, Robert; Marutzky, Sam

    2000-09-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in themore » vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.« less

  9. The Central Nervous System Sites Mediating the Orexigenic Actions of Ghrelin

    PubMed Central

    Mason, B.L.; Wang, Q.; Zigman, J.M.

    2014-01-01

    The peptide hormone ghrelin is important for both homeostatic and hedonic eating behaviors, and its orexigenic actions occur mainly via binding to the only known ghrelin receptor, the growth hormone secretagogue receptor (GHSR). GHSRs are located in several distinct regions of the central nervous system. This review discusses those central nervous system sites that have been found to play critical roles in the orexigenic actions of ghrelin, including hypothalamic nuclei, the hippocampus, the amygdala, the caudal brain stem, and midbrain dopaminergic neurons. Hopefully, this review can be used as a stepping stone for the reader wanting to gain a clearer understanding of the central nervous system sites of direct ghrelin action on feeding behavior, and as inspiration for future studies to provide an even-more-detailed map of the neurocircuitry controlling eating and body weight. PMID:24111557

  10. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 204: STORAGE BUNKERS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Corrective Action Unit (CAU) 330 consists of four Corrective Action Sites (CASs) located in Areas 6, 22, and 23 of the Nevada Test Site (NTS). The unit is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as CAU 330: Areas 6, 22, and 23 Tanks and Spill Sites. CAU 330 consists of the following CASs: CAS 06-02-04, Underground Storage Tank (UST) and Piping CAS 22-99-06, Fuel Spill CAS 23-01-02, Large Aboveground Storage Tank (AST) Farm CAS 23-25-05, Asphalt Oil Spill/Tar Release

  11. Corrective Action Decision Document for Corrective Action Unit 224: Decon Pad and Septic Systems Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    2005-05-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, in Areas 2, 3, 5, 6, 11, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 224 is comprised of the following corrective action sites (CASs): (1) 02-04-01, Septic Tank (Buried); (2) 03-05-01, Leachfield; (3) 05-04-01, Septic Tanks (4)/Discharge Area; (4) 06-03-01, Sewage Lagoons (3); (5) 06-05-01, Leachfield; (6) 06-17-04, Decon Pad and Wastewater Catch; (7) 06-23-01, Decon Pad Discharge Piping; (8) 11-04-01, Sewage Lagoon; and (9) 23-05-02,more » Leachfield. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for the nine CASs within CAU 224. Corrective action investigation activities were performed from August 10, 2004, through January 18, 2005, as set forth in the CAU 224 Corrective Action Investigation Plan.« less

  12. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1 with ROTC 1 and Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tim Echelard

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highwaymore » 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  13. Modeling to optimize operational practices to limit shallow dose and dose to the lens at the Weldon Spring Site Remedial Action Project.

    PubMed

    Hillman, D J; Green, S W

    1994-10-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) began remediation of its chemical plant buildings in June 1992. The chemical plant was used by the Atomic Energy Commission in the 1950's and 1960's to process uranium ore and natural thorium. Many remaining equipment surfaces were highly contaminated with uranium and thorium product residues, which are relatively weak gamma emitters, but are strong beta emitters that deposit the majority of their energy within the first centimeter of tissue. An essential part of the remediation, therefore, is to control the dose to the skin, extremities, and the lens of the eye from the broad range of betas emitted by uranium and thorium decay series radionuclides. The WSSRAP planned to quantitatively record the dose to the skin, extremities, and the lens of the eye, when warranted, through selection and use of appropriate passive dosimeters. That would not, however, constitute control. A direct-reading instrument was needed that could be used by field technicians to anticipate and prevent work methods and situations that would otherwise result in the unnecessary commitment of dose. However, the interpretation of real-time instrument readings produced by a broad spectrum of beta energies is typically challenging at best, particularly when the shallow dose rate and the lens dose rate are both of interest. The purpose of this effort was, therefore, to (1) select a direct-reading instrument for use in the buildings that could be used to provide rule-of-thumb action levels for field technicians, which, if exceeded, would warrant worker protective measures; (2) determine the approximate conversions between the instrument readings and the shallow (including extremity) dose rate and lens of the eye dose rate; and (3) specify protective measures and dosimetry for the lens of the eye, if warranted. Methods described in the literature are used to estimate action levels for direct instrument readings and to demonstrate that lens

  14. No Further Remedial Action Planned Decision Document for Site 3.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery

  15. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-29

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project,more » as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.« less

  16. Addendum to the Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation

  17. Admiral nursing competency project: practice development and action research.

    PubMed

    Dewing, Jan; Traynor, Victoria

    2005-07-01

    Admiral Nurses are specialist dementia care nurses working in the community with carers of those who have a dementia. The aim of the competency project (2000-2003) was threefold. Firstly to work collaboratively with these specialist nurses to facilitate the development a competency framework that reflects the needs of the Admiral Nursing Service. Secondly, to provide a way to structure evidence demonstrating evolving competency. Thirdly, to specifically enable the nurses to demonstrate evidence of achieving the UK Nursing and Midwifery Council's Higher Level Practice standard. The two complementary approaches of emancipatory action research and systematic practice development were adopted. Methods were taken from action research and systematic practice development approaches with an emphasis on promoting and enabling enlightenment, critical reflection, ownership and creating the best conditions for long-term commitment to the competency framework. The main outcome from this project was the development of a specialist nursing competency framework. The Admiral Nurses' Competency Framework is made up of a set of eight core competencies with three levels of competency statements, loosely structured around the Higher Level Practice standard, and guidance documentation to illustrate how work-based evidence can be generated to demonstrate competence. There were also process-derived outcomes associated with combining systematic practice development with emancipatory action research that had an impact on the culture. The main outcomes here were that practitioners engaged in and experienced learning about how to research their own practice and the consequences of doing this. They also learnt about specialist nursing practice more widely than Admiral Nursing. Finally, there was some increase in awareness about the culture within their teams and organizations. The final competency framework reflects the needs of the service, is owned by the majority of practitioners and

  18. Strategic Approaches to Practice: An Action Research Project

    ERIC Educational Resources Information Center

    Burwell, Kim; Shipton, Matthew

    2013-01-01

    The importance of personal practice for instrumentalists and vocalists is well established among researchers, and axiomatic for practitioners. This paper reports on a phase of an action research project, investigating student approaches to personal practice. Following a preliminary questionnaire study, a residential clinic was conducted by…

  19. Planning-in-Action: An Innovative Approach to Human Development. The Hunger Project.

    ERIC Educational Resources Information Center

    Community Development Journal, 1991

    1991-01-01

    The Hunger Project in India used a strategic planning-in-action approach that involved (1) reaching a common understanding; (2) creating a strategic intent; (3) choosing social indicators; (4) identifying strategic objectives; (5) empowering leadership; (6) identifying immediate action steps; and (7) sustaining the action. (SK)

  20. Is Action Research Necessarily Collaborative? Changing Mutuality within a Project

    ERIC Educational Resources Information Center

    Sousa, Francisco

    2016-01-01

    This article reports a study on collaboration within an action research project that was conducted by university researchers and elementary school teachers in the Azores, Portugal. More specifically, it examines how different kinds of participants worked together in different phases of the project. The notion of mutuality (i.e., the relative…

  1. Developing Capacity for Social and Emotional Growth: An Action Research Project

    ERIC Educational Resources Information Center

    Doveston, Mary

    2007-01-01

    This article reports an action research project in which children, their teacher and the author, and an advisory teacher from a Local Authority collaborated as co-researchers in a project to improve working relationships in the classroom. Both appreciative enquiry and emancipatory research informed the project. This article focuses on one aspect…

  2. Multilingual Affordances in a Swedish Preschool: An Action Research Project

    ERIC Educational Resources Information Center

    Ljunggren, Åsa

    2016-01-01

    This article summarizes the work and the main findings of an action research project that was conducted in an early childhood education and care setting in the city of Malmö, Sweden in the autumn of 2013 and spring 2014. Rönnerman's model (Aktionsforskning i praktiken: förskola och skola på vetenskaplig grund [Action research in practice:…

  3. Project Northland high school interventions: community action to reduce adolescent alcohol use.

    PubMed

    Perry, C L; Williams, C L; Komro, K A; Veblen-Mortenson, S; Forster, J L; Bernstein-Lachter, R; Pratt, L K; Dudovitz, B; Munson, K A; Farbakhsh, K; Finnegan, J; McGovern, P

    2000-02-01

    Project Northland is a randomized community trial initially implemented in 24 school districts and communities in northeastern Minnesota, with goals of delaying onset and reducing adolescent alcohol use using community-wide, multiyear, multiple interventions. The study targets the Class of 1998 from the 6th to 12th grades (1991-1998). The early adolescent phase of Project Northland has been completed, and reductions in the prevalence of alcohol use at the end of 8th grade were achieved. Phase II of Project Northland, targeting 11th- and 12th-grade students, uses five major strategies: (1) direct action community organizing methods to encourage citizens to reduce underage access to alcohol, (2) youth development involving high school students in youth action teams, (3) print media to support community organizing and youth action initiatives and communicate healthy norms about underage drinking (e.g., providing alcohol to minors is unacceptable), (4) parent education and involvement, and (5) a classroom-based curriculum for 11th-grade students. This article describes the background, design, implementation, and process measures of the intervention strategies for Phase II of Project Northland.

  4. Corrective Action Plan for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. B. Jackson

    2003-05-01

    The Areas 25, 26 and 27 Septic Systems are in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 271. This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for CAU 271. CAU 271 is located on the Nevada Test Site (NTS) approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada, and consists of the following 15 Corrective Action Sites (CAS): CAS 25-04-1, Septic System; CAS 25-04-03, Septic System; CAS25-04-04, Septic System; CAS 25-04-08, Septic System; CAS 25-04-09, Septic System; CAS 25-04-10, Septic System; CAS 25-04-11, Septicmore » System; CAS 26-03-01, Contaminated Water Reservoir; CAS 26-04-1, Septic System; CAS 26-04-02, Septic System; CAS 26-05-01, Radioactive Leachfield; CAS-26-05-03, Septic System; CAS 26-05-04, Septic System; CAS 26-05-05, Septic System; and CAS 27-05-02, Leachfield.« less

  5. Blogging across the Curriculum: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Andrea

    2012-01-01

    "Blogging across the curriculum: Integrating blogging in the elementary classroom" is an Action Research Project that sought to explore the level of engagement in the writing process by students in grades 3, 4 & 5 while blogging across the curriculum. Blogging took place in homeroom classrooms as well as in the school's math, science and…

  6. Project ASSIST: Action Strategies for Implementing Social Transition.

    ERIC Educational Resources Information Center

    Urban League of Greater New Orleans, LA.

    Project ASSIST (Action Strategies for Implementing Social Transition) is an attempt to assess the needs, concerns, problems, strengths, and preferences of low income area residents within the city of New Orleans by developing primary based data. This report presents the findings of two major surveys, in which 1,306 households in eight low income…

  7. A case study of the development of environmental action projects from the framework of participatory action research within two middle school classrooms

    NASA Astrophysics Data System (ADS)

    Charmatz, Kim

    The purpose of this study was to understand student and teacher empowerment through a socially critical environmental education perspective. The main research question guiding this study was: How do participants make sense of a learning experience in which students design and carry out an environmental action project in their community? This study used participatory action research and critical theory as practical and theoretical frameworks. These frameworks were relevant as this study sought to examine social change, power, and relationships through participants' experiences. The context of this study was within one seventh and one eighth grade classroom participating in environmental projects. The study was conducted in spring 2005 with an additional follow-up data collection period during spring 2006. The school was located in a densely populated metropolitan suburb. Fifty-three students, a teacher researcher, and three science teachers participated. Data sources were written surveys, scores on Middle School Environmental Literacy Survey Instrument (MSELI), observations, interviews, and student work. This study used a mixed methodological approach. Quantitative data analysis involved dependent samples t-test scores on the MSELI before and after the completion of the projects. Qualitative data were analyzed using an inductive analysis approach. This study has implications for educators interested in democratic education. Environmental action projects provide a context for students and teachers to learn interdisciplinary content knowledge, develop personal beliefs, and learn ways to take action in their communities. This pedagogy has the potential to increase cooperation, communication, and tensions within school communities. Students' participation in the development of environmental action projects may lead to feelings of empowerment or being able to make a difference in their community, as an individual or member of a group. Future research is needed to discern

  8. American Recovery and Reinvestment Act Wind Turbine Projects at Long-Range Radar Sites in Alaska Were Not Adequately Planned

    DTIC Science & Technology

    2011-09-30

    Ratio TAFS Treasury Appropriation Fund Symbol INSPECTOR GENERAL DEPARTMENT OF DEFENSE 400 ARMY NAVY DRIVE ARLINGTON, VIRGINIA 22202-4704...Symbol ( TAFS ) to the www.recovery.gov Web site. As a result of our review, officials at AFCESA took action to correct the errors in the...projects in a timely manner, and the funding authorization documents properly identified a Recovery Act designation. Funding documents cited a TAFS of

  9. The collection of national trend data on alcohol related crashes for comparison with alcohol safety action projects results. Volume 2, ASAP control site data

    DOT National Transportation Integrated Search

    1977-07-01

    As a result of evaluations of the Alcohol Safety Action Projects (ASAP), a requirement was generated by the National Highway Traffic Safety Administration (NHTSA) for the development of a data base of alcohol-related accidents in communities with no ...

  10. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... of limitation on claims for judicial review of actions by FHWA. SUMMARY: This notice announces... a proposed project, the SR 520 Pontoon Construction Project in the State of Washington. Those... agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency...

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less

  12. Improved dense trajectories for action recognition based on random projection and Fisher vectors

    NASA Astrophysics Data System (ADS)

    Ai, Shihui; Lu, Tongwei; Xiong, Yudian

    2018-03-01

    As an important application of intelligent monitoring system, the action recognition in video has become a very important research area of computer vision. In order to improve the accuracy rate of the action recognition in video with improved dense trajectories, one advanced vector method is introduced. Improved dense trajectories combine Fisher Vector with Random Projection. The method realizes the reduction of the characteristic trajectory though projecting the high-dimensional trajectory descriptor into the low-dimensional subspace based on defining and analyzing Gaussian mixture model by Random Projection. And a GMM-FV hybrid model is introduced to encode the trajectory feature vector and reduce dimension. The computational complexity is reduced by Random Projection which can drop Fisher coding vector. Finally, a Linear SVM is used to classifier to predict labels. We tested the algorithm in UCF101 dataset and KTH dataset. Compared with existed some others algorithm, the result showed that the method not only reduce the computational complexity but also improved the accuracy of action recognition.

  13. Corrective Action Decision Document for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0 with ROTC 1, 2, and Errata

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wickline, Alfred

    2004-04-01

    This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 204 Storage Bunkers, Nevada Test Site (NTS), Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE); and the U.S. Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) north of Las Vegas, Nevada (Figure 1-1). The Corrective Action Sites (CASs) within CAU 204 are located in Areas 1, 2, 3, and 5 of the NTS, in Nye County, Nevada (Figure 1-2). Corrective Action Unit 204 ismore » comprised of the six CASs identified in Table 1-1. As shown in Table 1-1, the FFACO describes four of these CASs as bunkers one as chemical exchange storage and one as a blockhouse. Subsequent investigations have identified four of these structures as instrumentation bunkers (CASs 01-34-01, 02-34-01, 03-34-01, 05-33-01), one as an explosives storage bunker (CAS 05-99-02), and one as both (CAS 05-18-02). The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activities conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada

  14. Taking Action: An Educator's Guide to Involving Students in Environmental Projects

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2012

    2012-01-01

    Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…

  15. Addendum 2 to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, Revison 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title,more » and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such

  16. Pedestrian and motorists' actions at pedestrian hybrid beacon sites: findings from a pilot study.

    PubMed

    Pulugurtha, Srinivas S; Self, Debbie R

    2015-01-01

    This paper focuses on an analysis of pedestrian and motorists' actions at sites with pedestrian hybrid beacons and assesses their effectiveness in improving the safety of pedestrians. Descriptive and statistical analyses (one-tail two-sample T-test and two-proportion Z-test) were conducted using field data collected during morning and evening peak hours at three study sites in the city of Charlotte, NC, before and after the installation of pedestrian hybrid beacons. Further, an analysis was conducted to assess the change in pedestrian and motorists' actions over time (before the installation; 1 month, 3 months, 6 months, and 12 months after the installation). Results showed an increase in average traffic speed at one of the pedestrian hybrid beacon sites while no specific trends were observed at the other two pedestrian hybrid beacon sites. A decrease in the number of motorists not yielding to pedestrians, pedestrians trapped in the middle of the street, and pedestrian-vehicle conflicts were observed at all the three pedestrian hybrid beacon sites. The installation of pedestrian hybrid beacons did not have a negative effect on pedestrian actions at two out of the three sites. Improvements seem to be relatively more consistent 3 months after the installation of the pedestrian hybrid beacon.

  17. Brazilian Eratosthenes Project

    NASA Astrophysics Data System (ADS)

    Langhi, R.; Vilaça, J.

    2014-10-01

    The objective of Brazilian Eratosthenes Project is the development and application of teaching training actions according the ``docent autonomy" concept to basic Astronomy Education. Argentina coordinates the project in South America, but Brazil works in this project since 2010 with the theme ``Projeto Eratóstenes Brasil" in the homepage: http://sites.google.com/site/projetoerato. Two schools measure a sticks shadow and communicate their results. After, they calculate an average radius of Earth. The stick (gnomon) should stay in vertical position in the leveled ground. Since 2010, the project received hundreds of Brazilian schools with different experiments that were constructed with autonomy, because our site doesn't show some itinerary pre-ready to elaborate the experiments. To collect data for our research, we will use interviews via Skype with the teachers. These data are useful to researches about Science Education area and the Teaching Formation. Teaching professional practice could change and we see modifications in the teachers work, what depends of their realities and context. This project intents to respect the docent autonomy. This autonomy to responsible modifications during continued formation is called ``activist formative model" according Langhi & Nardi (Educação em Astronomia: repensando a formação de professores. São Paulo: Escrituras Editora, 2012). This project discusses about researches in Astronomy Education - still extreme rare in Brazil, when we compare with other areas in Science Education. We believe that actions like this could motivate the students to learn more Astronomy. Furthermore, this national action can be a rich source of data to investigations about teaching formation and scientific divulgation.

  18. The Reflective Dispositional Coaching Process: An Action Research Project

    ERIC Educational Resources Information Center

    Bell, Edwin D.; Grant, Kathy; Fisk-Moody, Patricia

    2007-01-01

    The authors implemented an action research project to help teacher education candidates to reflect upon, assess, and ultimately strengthen teacher candidate dispositions through the Reflective Dispositional Coaching Model. The teacher education faculty agreed that candidate dispositions should address four areas: (a) professionalism, (b)…

  19. Project InterActions: A Multigenerational Robotic Learning Environment

    NASA Astrophysics Data System (ADS)

    Bers, Marina U.

    2007-12-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both parents and children about the mechanical and programming aspects involved in robotics, as well as to initiate them in a learning trajectory with and about technology. Results from this project address different ways in which parents and children learn together and provide insights into how to develop educational interventions that would educate parents, as well as children, in new domains of knowledge and skills such as robotics and new technologies.

  20. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA)more » of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021).« less

  1. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  2. Addendum to the Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 2000, Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 23-56-01, Former Mercury Fire Training Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not

  3. Yucca Mountain site characteriztion project bibliography. Progress Report, 1994--1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project which was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1994, through December 31, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are includedmore » in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology database which were not sponsored by the project but have some relevance to it.« less

  4. [Healthcare manager and project management of quality improvement : analysis of managerial action using a professional hands-on training in project management].

    PubMed

    Dujardin, Pierre-Philippe; Reverdy, Thomas; Valette, Annick; François, Patrice

    2016-06-01

    Introduction : project management is on the expected proficiencies for head nurses. Context : The work on the organizations’ improvement carried out by head nurses, is rarely covered in the literature. Objectives : to follow the implementation of actions from projects led by head nurses and to analyze the parameters of success. Method : for a year, an intervention study has followed 17 projects initiating improvement measures. Semistructured interviews were conducted with health-care teams and managers. All of them reported the results of the implementation of each measure as an operational improvement. A mixed analysis containing a logistic regression investigated associations between the result of the action and the various contextual characteristics. Results : this study involved 111 actions. 71 % of them concluded an operational improvement. The organizational and supporting actions had a high success rate, which decreased when hazards were not managed by healthcare managers. Discussion : this study highlights the place of strategies through the implementing methods and the chosen actions. Recommendations are made in order to promote a collective assessment. Conclusion : scientific approaches are proposed to discuss the organizational work.

  5. Culminating Experience Action Research Projects, Volume 3, Spring 2003.

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S., Ed.

    This document presents the course syllabus for Education 590 Culminating Experience at the University of Tennessee at Chattanooga's teacher licensure program. It also includes action research projects from spring 2003: "'To Track or Untrack...That Is the Question'" (Sarah Armes); "Providing Urban Students with the Motivation to…

  6. Global Land Survey Impervious Mapping Project Web Site

    NASA Technical Reports Server (NTRS)

    DeColstoun, Eric Brown; Phillips, Jacqueline

    2014-01-01

    The Global Land Survey Impervious Mapping Project (GLS-IMP) aims to produce the first global maps of impervious cover at the 30m spatial resolution of Landsat. The project uses Global Land Survey (GLS) Landsat data as its base but incorporates training data generated from very high resolution commercial satellite data and using a Hierarchical segmentation program called Hseg. The web site contains general project information, a high level description of the science, examples of input and output data, as well as links to other relevant projects.

  7. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    DTIC Science & Technology

    2016-09-01

    unneeded to support U.S. forces in the CENTCOM area of responsibility and in future contingencies worldwide. View GAO-16-406. For more information...DEFENSE INFRASTRUCTURE Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency ...Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations Why GAO Did This Study For about 15 years, DOD

  8. Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated

  9. Development of a site analysis tool for distributed wind projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shaw, Shawn

    The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimatesmore » of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.« less

  10. Addendum to the Closure Report for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the August 2004, Closure Report for Corrective Action Unit 271, Areas 25, 26, and 27 Septic Systems as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS 27-05-02, Leachfield. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR to an administrative UR. Administrative URs differ

  11. Engaging Key Stakeholders in Climate Change: A Community-Based Project for Youth-Led Participatory Climate Action

    NASA Astrophysics Data System (ADS)

    Trott, Carlie D.

    Few studies have examined how youth think about, and take action on climate change and far fewer have sought to facilitate their engagement using participatory methods. This dissertation evaluated the impacts of Science, Camera, Action! (SCA), a novel after-school program that combined climate change education with participatory action through photovoice. The specific aims of this study were to: (1) Evaluate the impacts of SCA on youth participants' climate change knowledge, attitudes, and behaviors; (2) Examine how SCA participation served to empower youth agency; and (3) Explore SCA's influence on youths' science engagement. Participants were 55 youths (ages 10 to 12) across three Boys and Girls Club sites in Northern Colorado. SCA's Science component used interactive activities to demonstrate the interrelationships between Earth's changing climate, ecosystems, and sustainable actions within communities. Photovoice, SCA's Camera component, was used to explore youths' climate change perspectives and to identify opportunities for their active engagement. Finally, SCA's Action component aimed to cultivate youth potential as agents of change in their families and communities through the development and implementation of youth-led action projects. Action projects included local policy advocacy, a tree-planting campaign, a photo gallery opening, development of a website, and the establishment of a Boys and Girls Club community garden. To evaluate SCA impacts, a combination of survey and focus group methods were used. Following the program, youth demonstrated increased knowledge of the scientific and social dimensions of the causes and consequences of climate change, as well as its solutions through human action. Though participants expressed a mix of positive (e.g., hope) and negative (e.g., sadness) emotions about climate change, they left the program with an increased sense of respect for nature, an enhanced sense of environmental responsibility, and a greater sense

  12. Corrective Action Investigation Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada with ROTC 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature andmore » extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of

  13. Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were

  14. Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada with Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    2002-11-12

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions

  15. Addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the January 2004, Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 20-23-02, Postshot Cellar • CAS 20-23-03, Cellar • CAS 20-23-04, Postshot Cellar • CAS 20-23-05, Postshot Cellar • CAS 20-23-06, Cellar • CAS 20-37-01, Cellar & Mud Pit • CAS 20-37-05, Cellar These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk

  16. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook seriesmore » contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.« less

  17. Groundwater Site Characterization: A Systems Perspective.

    ERIC Educational Resources Information Center

    Wolf, Frederick

    1994-01-01

    Groundwater remedial actions are highly complex projects. During the past 10 years, many remedial actions have begun, but very few have been successfully completed. This paper describes the complexity of groundwater remediation and offers an alternative management approach involving systems movement successfully utilized at a site in the…

  18. Corrective Action Decision Document/Closure Report for Corrective Action Unit 478: Area 12 T-Tunnel Ponds, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less

  19. Corrective Action Decision Document/Closure Report for Corrective Action Unit 559: T Tunnel Compressor/Blower Pad, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less

  20. An analysis of problem drinker diagnosis and referral within the Fairfax Alcohol Safety Action Project, 1972.

    DOT National Transportation Integrated Search

    1974-01-01

    This report is one of a series developed in conformance with annual reporting requirements contained within Alcohol Safety Action Projects: Evaluation. In February 1972, operations of the Fairfax Alcohol Safety Action Project began and these federall...

  1. The Role of Facilitators in Project Action Learning Implementation

    ERIC Educational Resources Information Center

    Cao, Rui; Chuah, Kong Bieng; Chao, Yiu Chung; Kwong, Kar Fai; Law, Mo Yin

    2012-01-01

    Purpose: This paper addresses the importance of a more proactive role of organizational learning (OL) facilitators, learning motivation reinforcer, through a two-part longitudinal study in a case company. The first part of this study aims to investigate and analyze some unexpected challenges in the project action learning-driven (PAL) OL…

  2. Phase II Transport Model of Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nye County, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregg Ruskuaff

    This document, the Phase II Frenchman Flat transport report, presents the results of radionuclide transport simulations that incorporate groundwater radionuclide transport model statistical and structural uncertainty, and lead to forecasts of the contaminant boundary (CB) for a set of representative models from an ensemble of possible models. This work, as described in the Federal Facility Agreement and Consent Order (FFACO) Underground Test Area (UGTA) strategy (FFACO, 1996; amended 2010), forms an essential part of the technical basis for subsequent negotiation of the compliance boundary of the Frenchman Flat corrective action unit (CAU) by Nevada Division of Environmental Protection (NDEP) andmore » National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Underground nuclear testing via deep vertical shafts was conducted at the Nevada Test Site (NTS) from 1951 until 1992. The Frenchman Flat area, the subject of this report, was used for seven years, with 10 underground nuclear tests being conducted. The U.S. Department of Energy (DOE), NNSA/NSO initiated the UGTA Project to assess and evaluate the effects of underground nuclear tests on groundwater at the NTS and vicinity through the FFACO (1996, amended 2010). The processes that will be used to complete UGTA corrective actions are described in the “Corrective Action Strategy” in the FFACO Appendix VI, Revision No. 2 (February 20, 2008).« less

  3. An Action Learning Project on Diversity: Pitfalls and Possibilities.

    ERIC Educational Resources Information Center

    Hite, Linda M.

    1997-01-01

    In a college course on diversity in the workplace, students' experiences with conducting a cultural audit of the university as a workplace illustrate the dilemmas that can arise when students conduct action research in a real client system. Despite the inherent problems, the project resulted in significant student learning about the subject and…

  4. Health Activities Project (HAP): Heart Fitness and Action Module.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within the Heart Fitness and Action Module are teacher and student folios describing five activities which involve students in…

  5. Addendum to the Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit Nevada Test Site, Nevada, Revison 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs

  6. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonablemore » effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project

  7. Culminating Experience Action Research Projects, Volume 1, Spring 2002

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S, Ed.; Bothman, Susan M., Ed.

    2005-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is now required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  8. Culminating Experience Action Research Projects, Volume 10, Spring 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  9. Culminating Experience Action Research Projects, Volume 11, Fall 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  10. Culminating Experience Action Research Projects, Volume 17, Fall 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 5900 Culminating…

  11. Culminating Experience Action Research Projects, Volume 5, Spring 2004

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Bothman, Susan M., Ed

    2005-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  12. Culminating Experience Action Research Projects, Volume 13, Fall 2008

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  13. Culminating Experience Action Research Projects, Volume 7, Fall 2005

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  14. Culminating Experience Action Research Projects, Volume 14, Spring 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  15. Actionable Data Projects: Social Science and Service-Learning in General Education Courses

    ERIC Educational Resources Information Center

    Maloyed, Christie L.

    2016-01-01

    The use of service-learning pedagogies in general education courses is often limited to increasing volunteerism or civic literacy with problem-based or research-based projects reserved for upper level courses. This article examines the implementation of an "actionable data" service-learning project in an introductory, general studies…

  16. Full Circle: Stakeholders' Evaluation of a Collaborative Enquiry Action Research Literacy Project

    ERIC Educational Resources Information Center

    Forey, Gail; Firkins, Arthur S.; Sengupta, Sima

    2012-01-01

    This paper reports on school-university collaboration during an action research project, which aimed to build a writing pedagogy for students with Learning Disabilities in the trilingual, biliterate educational context of Hong Kong. The project was established through interpersonal relationships built from the ground up between stakeholders from a…

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-06-01

    Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of

  18. Crustal dynamics project site selection criteria

    NASA Technical Reports Server (NTRS)

    Allenby, R.

    1983-01-01

    The criteria for selecting site locations and constructing observing pads and monuments for the Mobile VLB1 and the satellite laser ranging systems used in the NASA/GSFC Crustal Dynamics Project are discussed. Gross system characteristics (size, shape, weight, power requirement, foot prints, etc.) are given for the Moblas, MV-1 through 3, TLRS-1 through 4 and Series instruments.

  19. Multiple Intelligences Theory, Action Research, and Teacher Professional Development: The Irish MI Project

    ERIC Educational Resources Information Center

    Hanafin, Joan

    2014-01-01

    This paper presents findings from an action research project that investigated the application of Multiple Intelligences (MI) theory in classrooms and schools. It shows how MI theory was used in the project as a basis for suggestions to generate classroom practices; how participating teachers evaluated the project; and how teachers responded to…

  20. An integrated ball projection technology for the study of dynamic interceptive actions.

    PubMed

    Stone, J A; Panchuk, D; Davids, K; North, J S; Fairweather, I; Maynard, I W

    2014-12-01

    Dynamic interceptive actions, such as catching or hitting a ball, are important task vehicles for investigating the complex relationship between cognition, perception, and action in performance environments. Representative experimental designs have become more important recently, highlighting the need for research methods to ensure that the coupling of information and movement is faithfully maintained. However, retaining representative design while ensuring systematic control of experimental variables is challenging, due to the traditional tendency to employ methods that typically involve use of reductionist motor responses such as buttonpressing or micromovements. Here, we outline the methodology behind a custom-built, integrated ball projection technology that allows images of advanced visual information to be synchronized with ball projection. This integrated technology supports the controlled presentation of visual information to participants while they perform dynamic interceptive actions. We discuss theoretical ideas behind the integration of hardware and software, along with practical issues resolved in technological design, and emphasize how the system can be integrated with emerging developments such as mixed reality environments. We conclude by considering future developments and applications of the integrated projection technology for research in human movement behaviors.

  1. Public opinion and communicative action around renewable energy projects

    NASA Astrophysics Data System (ADS)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse

  2. Climate Change Projection for the Department of Energy's Savannah River Site

    NASA Astrophysics Data System (ADS)

    Werth, D. W.

    2014-12-01

    As per recent Department of Energy (DOE) sustainability requirements, the Savannah River National Laboratory (SRNL) is developing a climate projection for the DOE's Savannah River Site (SRS) near Aiken, SC. This will comprise data from both a statistical and a dynamic downscaling process, each interpolated to the SRS. We require variables most relevant to operational activities at the site (such as the US Forest Service's forest management program), and select temperature, precipitation, wind, and humidity as being most relevant to energy and water resource requirements, fire and forest ecology, and facility and worker safety. We then develop projections of the means and extremes of these variables, estimate the effect on site operations, and develop long-term mitigation strategies. For example, given that outdoor work while wearing protective gear is a daily facet of site operations, heat stress is of primary importance to work planning, and we use the downscaled data to estimate changes in the occurrence of high temperatures. For the statistical downscaling, we use global climate model (GCM) data from the Climate Model Intercomparison Project, version 5 (CMIP-5), which was used in the IPCC Fifth Assessment Report (AR5). GCM data from five research groups was selected, and two climate change scenarios - RCP 4.5 and RCP 8.5 - are used with observed data from site instruments and other databases to produce the downscaled projections. We apply a quantile regression downscaling method, which involves the use of the observed cumulative distribution function to correct that of the GCM. This produces a downscaled projection with an interannual variability closer to that of the observed data and allows for more extreme values in the projections, which are often absent in GCM data. The statistically downscaled data is complemented with dynamically downscaled data from the NARCCAP database, which comprises output from regional climate models forced with GCM output from the

  3. Closure Report for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    The purpose of this CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 568 based on the implementation of corrective actions. This includes a description of closure activities that were performed and an evaluation of the verification data. The CAP (NNSA/NFO, 2016a) and ROTC-1 (NNSA/NFO, 2016c) provide information relating to the selection of CAAs and the reasoning behind their selection. The CADD (NNSA/NFO, 2015) identifies the release sites that require additional corrective action and presents information supporting the selection of CAAs.

  4. Radiologic characterization of the Mexican Hat, Utah, uranium mill tailings remedial action site: Appendix D, Addenda D1--D7

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ludlam, J.R.

    1985-01-01

    This radiologic characterization of the inactive uranium millsite at Mexican Hat, Utah, was conducted by Bendix Field Engineering Corporation foe the US Department of Energy (DOE), Grand Junction Project Office, in response to and in accord with a Statement of Work prepared by the DOE Uranium Mill tailings Remedial Action Project (UMTRAP) Technical Assistance Contractor, Jacobs Engineering Group, Inc. the objective of this project was to determine the horizontal and vertical extent of contamination that exceeds the US Environmental Protection Agency (EPA) standards at the Mexican Hat site. The data presented in this report are required for characterization of themore » areas adjacent to the Mexican Hat tailings piles and for the subsequent design of cleanup activities. Some on-pile sampling was required to determine the depth of the 15-pCi/g Ra-226 interface in an area where wind and water erosion has taken place.« less

  5. Action Civics for Promoting Civic Development: Main Effects of Program Participation and Differences by Project Characteristics

    PubMed Central

    Cohen, Alison K.; Littenberg-Tobias, Joshua

    2017-01-01

    Using both quantitative and qualitative data, this study examined the effect of participating in an action civics intervention, Generation Citizen (GC), on civic commitment, civic self-efficacy, and two forms of civic knowledge. The sample consisted of 617 middle and high schools students in 55 classrooms who participated, or were soon to participate, in Generation Citizen. Hierarchical linear models revealed that participating in Generation Citizen was associated with positive gains in action civics knowledge and civic self-efficacy. Qualitative coding identified three types of project characteristics that captured variability in the action projects student chose to complete: context, content, and contact with decision makers. Interactions between project characteristics and participation in GC revealed differences in civic outcomes depending on project characteristics. PMID:27982470

  6. Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister and Patrick Matthews

    2012-11-01

    The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less

  7. Remedial action suitability for the Cornhusker Army Ammunition Plant site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nonavinakere, S.; Rappa, P. III

    1995-12-31

    Numerous Department of Defense (DOD) sites across the nation are contaminated with explosive wastes due to munitions production during World War II, Korean Conflict and Vietnam Conflict. Production activities included explosives manufacturing, loading, packing, assembling, machining, casting and curing. Contaminants often present at these sites include TNT, RDX, HMX, Tetryl 2,4-DNT, 2,6-DNT, 1,3-DNB, 1,3,5-TNB and nitrobenzene. The Cornhusker Army Ammunition Plant (CAAP) is one such DOD site that has been determined to be contaminated with explosives. The CAAP is located approximately 2 miles west of the City of Grand Island in Hall County, Nebraska. The plant produced artillery, bombs, boosters,more » supplementary charges and various other experimental explosives. The purpose of this paper is to provide an overview of the site background, review of the remedial alternatives evaluation process and rationale behind the selection of present remedial action.« less

  8. Beyond You and Me: Stories for Collective Action and Learning? Perspectives from an Action Research Project

    ERIC Educational Resources Information Center

    Gearty, Margaret

    2015-01-01

    This paper explores the combination of storytelling and reflective action research as a means to effect change and learning within and across communities and organizations. Taking the complex challenge of "pro-environmental behaviour change" as an example, the paper reflects on the experiences of a pilot project run for the UK government…

  9. Project Developmental Continuity Evaluation: Site Visitors' Manual.

    ERIC Educational Resources Information Center

    Morris, Mary; Smith, Allen

    This site visitors' manual is part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. The PDC evaluation documents and analyzes the process of program…

  10. Library Spaces for Urban, Diverse Commuter Students: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Brown-Sica, Margaret S.

    2012-01-01

    A data-gathering project using elements of Participatory Action Research was conducted at the Auraria Library, which serves the University of Colorado Denver, the Metropolitan State College of Denver and the Community College of Denver. The project was administered in order to shape a plan to develop a Learning Commons environment at the library.…

  11. Evaluation of an action research project in ophthalmic nursing practice.

    PubMed

    Waterman, Heather; Harker, Rona; MacDonald, Heather; McLaughlan, Rita; Waterman, Christine

    2005-11-01

    This paper reports the evaluation phase of an action research project that promoted face-down posturing of patients following vitreo-retinal surgery for macular hole to enhance patient outcomes. The evaluation phase identified areas of practice needing further development from the perspectives of those involved with the care of patients. To achieve best results following surgical repair of macular hole, patients are required to posture face down for several weeks. As a consequence, patients complain of severe back and neck ache and find it difficult to persist with the posturing. Work to advance nursing practice as surgical developments occur has relevance beyond ophthalmology and the particular context of this project. The first three phases of this action research--problem identification, planning and action--have been reported in another paper. Throughout the project an action research group comprising of representatives of key stakeholders were actively involved in researching and changing practice. During the evaluation phase, a qualitative methodology was chosen. Interviews with 17 members of staff from the inpatient area were carried out to elicit their perspectives on the posturing of patients. Qualitative interviews were selected to facilitate comparison with interview data from Phase 1. Data analysis ran concurrently with data collection, so that one could inform the other. Overall, nurses and healthcare support workers felt that patients were more agreeable to posturing and after surgery began to posture more quickly. Communication was still an issue in some instances, and patients having urgent as opposed to planned surgery were found to be more difficult to prepare and the psychological care of patients still posed problems for nursing staff. The evaluation suggests that improvements in the care of this group of patients have occurred. A 10-point plan to promote face-down posturing has been developed which will be of use to practitioners in other

  12. A Collaborative Action Research Project towards Embedding ESD within the Higher Education Curriculum

    ERIC Educational Resources Information Center

    Cebrián, Gisela

    2017-01-01

    Purpose: This paper aims to present a collaborative action research project conducted at the University of Southampton with the aim to promote curriculum and professional development in education for sustainable development (ESD) and learn from everyday practices of academics. Design/methodology/approach: An action research approach guided by…

  13. No Further Action Decision Under CERCLA Study Area 43E Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    AREA 43E * HISTORIC GAS STATION SITES g FORT DEVENS , MASSACHUSETTS £ I CONTRACT DAAA15-91-D-0008I U.S. ARMY ENVIRONMENTAL CENTER3 ABERDEEN PROVING...FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43E HISTORIC GAS STATION SITES I FORT DEVENS , MASSACHUSETTS i I 1 Prepared for: U.S. Army...7053-12 JANUARY 1995 I I. NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43E HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS TABLE OF CONTENTS

  14. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    NASA Astrophysics Data System (ADS)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  15. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Survochak, Scott; Daniel, Joe

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quartermore » of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.« less

  16. Rural Community Action: A Series of Case Studies of Action Projects in Small New York State Communities. Miscellaneous Bulletin 116.

    ERIC Educational Resources Information Center

    Preston, James C.; Halton, Katherine B.

    The report presents case studies of 7 community action projects which were undertaken by New York communities with populations under 10,000 and which show how local leaders can improve the quality of life in their communities. The report describes the background, initiation, expansion, implementation, consequences, and highlights of the projects,…

  17. 78 FR 21352 - Update on Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... DEPARTMENT OF ENERGY Update on Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites AGENCY: Department of Energy. ACTION: Notice of the Title X claims during fiscal... at active uranium and thorium processing sites to remediate byproduct material generated as an...

  18. No Further Action Decision Document for Site 8 at Alpena Combat Readiness Training Center, Alpena, Michigan.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 8 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland fr r=.~r i^:r^f>^’ m% Approved for public...Document 4. TITLE AND SUBTITLE No Further Action Decision Document for Site 8 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 7. PERFORMING

  19. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards formore » th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document.« less

  20. Living memorials project: year 1 social and site assessment

    Treesearch

    Erika S. Svendsen; Lindsay K. Campbell

    2005-01-01

    The Living Memorials Project (LMP) social and site assessment identified more than 200 public open spaces created, used, or enhanced in memory of the tragic events of September 11, 2001 (9-11). A national registry of these sites is available for viewing and updating online. Researchers interviewed 100 community groups using social ecology methods of observation,...

  1. Closure Report for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR) Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin J.; Boehlecke, Robert F.

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendationmore » that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.« less

  2. Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-08-15

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  3. Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor

  4. Corrective Action Investigation Plan for Corrective Action Unit 527: Horn Silver Mine, Nevada Test Site, Nevada: Revision 1 (Including Records of Technical Change No.1, 2, 3, and 4)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 527, Horn Silver Mine, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 527 consists of one Corrective Action Site (CAS): 26-20-01, Contaminated Waste Dump No.1. The site is located in an abandoned mine site in Area 26 (which is the most arid part of the NTS) approximately 65 miles northwest of Las Vegas. Historicalmore » documents may refer to this site as CAU 168, CWD-1, the Wingfield mine (or shaft), and the Wahmonie mine (or shaft). Historical documentation indicates that between 1959 and the 1970s, nonliquid classified material and unclassified waste was placed in the Horn Silver Mine's shaft. Some of the waste is known to be radioactive. Documentation indicates that the waste is present from 150 feet to the bottom of the mine (500 ft below ground surface). This CAU is being investigated because hazardous constituents migrating from materials and/or wastes disposed of in the Horn Silver Mine may pose a threat to human health and the environment as well as to assess the potential impacts associated with any potential releases from the waste. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  5. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of

  6. VARIABLE BOUND-SITE CHARGING CONTRIBUTIONS TO SURFACE COMPLEXATION MASS ACTION EXPRESSIONS

    EPA Science Inventory

    One and two pK models of surface complexation reactions between reactive surface sites (>SOH) and the proton (H+) use mass action expressions of the form: Ka={[>SOHn-1z-1]g>SOH(0-1)aH+EXP(-xeY/kT)}/{[>SOHnz]g>SOH(n)} where Ka=the acidity constant, [ ]=reactive species concentrati...

  7. Summary of operations and performance of the Murdock site restoration project in 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters ofmore » a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix

  8. Project Change Evaluation Research Brief.

    ERIC Educational Resources Information Center

    Leiderman, Sally A.; Dupree, David M.

    Project Change is a community-driven anti-racism initiative operating in four communities: Albuquerque, New Mexico; El Paso, Texas; Knoxville, Tennessee; and Valdosta, Georgia. The formative evaluation of Project Change began in 1994 when all of the sites were still in planning or early action phases. Findings from the summative evaluation will be…

  9. Addendum to the Closure Report for Corrective Action Unit 355: Area 2 Cellars/Mud Pits Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  10. The Portland Harbor Superfund Site Sustainability Project: Introduction.

    PubMed

    Fitzpatrick, Anne G; Apitz, Sabine E; Harrison, David; Ruffle, Betsy; Edwards, Deborah A

    2018-01-01

    This article introduces the Portland Harbor Superfund Site Sustainability Project (PHSP) special series in this issue. The Portland Harbor Superfund Site is one of the "mega-sediment sites" in the United States, comprising about 10 miles of the Lower Willamette River, running through the heart of Portland, Oregon. The primary aim of the PHSP was to conduct a comprehensive sustainability assessment, integrating environmental, economic, and social considerations of a selection of the remedial alternatives laid out by the US Environmental Protection Agency. A range of tools were developed for this project to quantitatively address environmental, economic, and social costs and benefits based upon diverse stakeholder values. In parallel, a probabilistic risk assessment was carried out to evaluate the risk assumptions at the core of the remedial investigation and feasibility study process. Integr Environ Assess Manag 2018;14:17-21. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  11. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beranich, S.J.

    1994-08-24

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less

  12. Corrective Action Investigation Plan for Corrective Action Unit 516: Septic Systems and Discharge Points, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areasmore » 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.« less

  13. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    EPA Science Inventory

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  14. Corrective Action Decision Document/Closure Report for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-09-01

    Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of

  15. Yucca Mountain Site Characterization Project bibliography, 1992--1994. Supplement 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1992, through December 31, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are includedmore » in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it. Earlier information on this project can be found in the first bibliography DOE/TIC-3406, which covers 1977--1985, and its three supplements DOE/OSTI-3406(Suppl.1), DOE/OSTI-3406(Suppl.2), and DOE/OSTI-3406(Suppl.3), which cover information obtained during 1986--1987, 1988--1989, and 1990--1991, respectively. All entries in the bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE).« less

  16. With Hindsight: An Overview of the Autism Spectrum Disorder Participatory Action Research Project

    ERIC Educational Resources Information Center

    Curzon, Joanna

    2008-01-01

    Much has happened since nine teams across New Zealand engaged in a Ministry of Education-funded participatory action research project looking at effective practice for supporting children and young people with autism spectrum disorder (ASD) in education. Building on earlier discussions, the project ran from 2002 to 2004, and until now the story…

  17. Project M: Scale Model of Lunar Landing Site of Apollo 17

    NASA Technical Reports Server (NTRS)

    O'Brien, Hollie; Crain, Timothy P.

    2010-01-01

    The basis of the project was creating a scale model representation of the Apollo 17 lunar landing site. Vital components included surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. The model was made for Project M support when evaluating approach and terminal descent as well as when planning surface operations with respect to the terrain. The project had five main mi lestones during the length of the project. The first was examining the best method to use to re-create the Apollo 17 landing site and then reviewing research fmdings with Dr. Tim Crain and EO staff which occurred on June 25, 2010 at a meeting. The second step was formulating a construction plan, budget, and schedule and then presenting the plan for authority to proceed which occurred on July 6,2010. The third part was building a prototype to test materials and building processes which were completed by July 13, 2010. Next was assembling the landing site model and presenting a mid-term construction status report on July 29, 2010. The fifth and final milestone was demonstrating the model and presenting an exit pitch which happened on August 4, 2010. The project was very technical: it needed a lot of research about moon topography, lighting conditions and angles of the sun on the moon, Apollo 17, and Autonomous Landing and Hazard Avoidance Technology (ALHAT), before starting the actual building process. This required using Spreadsheets, searching internet sources and conducting personal meetings with project representatives. This information assisted the interns in deciding the scale of the model with respect to cracks, craters and rocks and their relative sizes as the objects mentioned could interfere with any of the Lunar Landers: Apollo, Project M and future Landers. The project concluded with the completion of a three dimensional scale model of the Apollo 17 Lunar landing site. This model assists Project M members because they can now visualize

  18. ATEE Interactive Co-ordination and Educational Monitoring of Socrates Comenius Action 3 Projects.

    ERIC Educational Resources Information Center

    Libotton, Arno; Van Braak, Johan; Garofalo, Mara

    2002-01-01

    Asserts that although the Comenius Action 3 courses were well-accepted and high quality, there is a need for a structure for easily monitoring and evaluating these projects. This article presents a pilot project designed with this purpose, which may be useful in implementing a system of coordination and communication among the different projects…

  19. Multiple Site Action Research Case Studies: Practical and Theoretical Benefits and Challenges

    ERIC Educational Resources Information Center

    Pereira, Mary Delfin; Vallance, Roger

    2006-01-01

    A curriculum initiative project was implemented in four schools in Singapore over a span of five to six weeks during 2004. The project employed a number of different schools: girls only, boys only and co-educational schools; different levels of performance in a graded situation; multiple teachers and classes within each site; and control and…

  20. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and

  1. Coastline Mapping and Cultural Review to Predict Sea Level Rise Impact on Hawaiian Archeological Sites

    NASA Astrophysics Data System (ADS)

    Clinton, J.

    2017-12-01

    Much of Hawaii's history is recorded in archeological sites. Researchers and cultural practitioners have been studying and reconstructing significant archeological sites for generations. Climate change, and more specifically, sea level rise may threaten these sites. Our research records current sea levels and then projects possible consequences to these cultural monuments due to sea level rise. In this mixed methods study, research scientists, cultural practitioners, and secondary students use plane-table mapping techniques to create maps of coastlines and historic sites. Students compare historical records to these maps, analyze current sea level rise trends, and calculate future sea levels. They also gather data through interviews with community experts and kupuna (elders). If climate change continues at projected rates, some historic sites will be in danger of negative impact due to sea level rise. Knowing projected sea levels at specific sites allows for preventative action and contributes to raised awareness of the impacts of climate change to the Hawaiian Islands. Students will share results with the community and governmental agencies in hopes of inspiring action to minimize climate change. It will take collaboration between scientists and cultural communities to inspire future action on climate change.

  2. The Story Project: An Online Site for Reading and Sharing.

    ERIC Educational Resources Information Center

    Padgett Wheeler, Sally

    This paper describes an online publishing site at Georgia Perimeter College called "The Story Project." The Web site contains more than 60 stories written by faculty members, students, administrators, staff, family, and friends, and serves to encourage student writing, create a community of writers, celebrate common and diverse past experiences,…

  3. CosmoQuest Year 1.5: Citizen Scientist Behaviors and Site Usage Across Multiple Projects

    NASA Astrophysics Data System (ADS)

    Gugliucci, Nicole E.; Gay, P. L.; Bracey, G.; CosmoQuest Team

    2013-06-01

    CosmoQuest launched as a citizen science portal in January 2012 and has since expanded to include three projects in planetary surface mapping, one completed project searching for KBOs, and several more on the way with various astrophysical science goals. We take a close look at how our users move through the site, how much time they spend on various tasks, project retention rate, and how many use multiple projects on the site. We are also piloting a citizen science motivation survey given to random site users to find out why citizen scientists join new projects and continue to participate. This is part of a larger project using online and real-life interactions to study citizen scientist behaviors, motivations, and learning with a goal of building better community with researchers, volunteers, educators, and developers.

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada National Security Site, Nevada with ROTC 1 and 2, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny

  5. Yes, I Can: Action Projects To Resolve Equity Issues in Educational Computing. A Project of ECCO, the Educational Computer Consortium of Ohio.

    ERIC Educational Resources Information Center

    Fredman, Alice, Ed.

    This book presents reports on selected "local action" projects that were developed as part of the Equity in Technology Project, which was inaugurated in 1985 by the Educational Computer Consortium of Ohio (ECCO). The book is organized into three sections, one for each of the populations targeted by the project. An introduction by Alice Fredman…

  6. Some Recurrent Disagreements about Social Change Which Affect Action Research Projects.

    ERIC Educational Resources Information Center

    Hofstetter, Heather N.; Hofstetter, Merlin I.

    This paper describes the beliefs and values of a pluralistic approach to social change and of four competing approaches: social Darwinism, functionalism, militancy, and conflict theory. Stressing the alienation and dogmatism of the competing approaches, the authors relate each approach to its operation in community action projects. Social…

  7. Adult Literacy Action Campaign: Projects around Australia. A Review of State and Territory Level Adult Literacy Projects Funded under the Adult Literacy Action Campaign of the National Policy on Languages. Occasional Paper Number 3.

    ERIC Educational Resources Information Center

    Australian Advisory Council on Languages and Multicultural Education, Canberra.

    This collection of papers is a review of the adult literacy projects in Australia funded under the 1987-89 Adult Literacy Action Campaign (ALAC) of the National Policy on Languages. Fourteen authors describe various literacy projects and, often, their outcomes. The projects described are grouped in seven areas. On the subject of Literacy Training…

  8. UMTRA project water sampling and analysis plan, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  9. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... on Proposed Light Rail Project in Washington AGENCY: Federal Highway Administration (FHWA... Light Rail Transit Project in King County Washington. These actions grant licenses, permits, and... Light Rail Transit Project, King County, WA. Federal Lead Agency: Federal Transit Administration (FTA...

  10. Corrective Action Investigation Plan for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1 and No. 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motormore » Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document.« less

  11. Action potentials in retinal ganglion cells are initiated at the site of maximal curvature of the extracellular potential.

    PubMed

    Eickenscheidt, Max; Zeck, Günther

    2014-06-01

    The initiation of an action potential by extracellular stimulation occurs after local depolarization of the neuronal membrane above threshold. Although the technique shows remarkable clinical success, the site of action and the relevant stimulation parameters are not completely understood. Here we identify the site of action potential initiation in rabbit retinal ganglion cells (RGCs) interfaced to an array of extracellular capacitive stimulation electrodes. We determine which feature of the extracellular potential governs action potential initiation by simultaneous stimulation and recording RGCs interfaced in epiretinal configuration. Stimulation electrodes were combined to areas of different size and were presented at different positions with respect to the RGC. Based on stimulation by electrodes beneath the RGC soma and simultaneous sub-millisecond latency measurement we infer axonal initiation at the site of maximal curvature of the extracellular potential. Stimulation by electrodes at different positions along the axon reveals a nearly constant threshold current density except for a narrow region close to the cell soma. These findings are explained by the concept of the activating function modified to consider a region of lower excitability close to the cell soma. We present a framework how to estimate the site of action potential initiation and the stimulus required to cross threshold in neurons tightly interfaced to capacitive stimulation electrodes. Our results underscore the necessity of rigorous electrical characterization of the stimulation electrodes and of the interfaced neural tissue.

  12. Clients, Colleagues or Experts? Defining Identities in an Action Research Project

    ERIC Educational Resources Information Center

    Coco, Angela; Varnier, Catherine; Deftereos, Chris

    2007-01-01

    This article examines how discourses shaped and were shaped by participants' identities in a participatory action research (PAR) project in a tertiary education environment. The primary researcher and the director of the university's desktop publishing team explored the idea of working together to help the newly formed team to develop strategies…

  13. Corrective Action Investigation Plan for Corrective Action Unit 165: Areas 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada (including Record of Technical Change Nos. 1, 2, and 3) (January 2002, Rev. 0)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 165 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 165 consists of eight Corrective Action Sites (CASs): CAS 25-20-01, Lab Drain Dry Well; CAS 25-51-02, Dry Well; CAS 25-59-01, Septic System; CAS 26-59-01, Septic System; CAS 25-07-06, Train Decontamination Area; CAS 25-07-07, Vehicle Washdown; CAS 26-07-01, Vehicle Washdown Station; and CAS 25-47-01, Reservoir and French Drain. All eight CASsmore » are located in the Nevada Test Site, Nevada. Six of these CASs are located in Area 25 facilities and two CASs are located in Area 26 facilities. The eight CASs at CAU 165 consist of dry wells, septic systems, decontamination pads, and a reservoir. The six CASs in Area 25 are associated with the Nuclear Rocket Development Station that operated from 1958 to 1973. The two CASs in Area 26 are associated with facilities constructed for Project Pluto, a series of nuclear reactor tests conducted between 1961 to 1964 to develop a nuclear-powered ramjet engine. Based on site history, the scope of this plan will be a two-phased approach to investigate the possible presence of hazardous and/or radioactive constituents at concentrations that could potentially pose a threat to human health and the environment. The Phase I analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. If laboratory data obtained from the Phase I investigation indicates the presence of contaminants of concern, the process will continue with a Phase II investigation to define the extent of contamination. Based on the

  14. Trends in public information within the Fairfax Alcohol Safety Action Project, 1975.

    DOT National Transportation Integrated Search

    1976-01-01

    To assess current trends in the effectiveness of the public information and education countermeasure of the Fairfax Alcohol Safety Action Project, two pieces of survey type research are conducted on a periodic basis. The roadside survey has been cond...

  15. Consolidated Quarterly Report: Number of potential release sites subject to corrective action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    2017-04-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent. The 12 sites in the corrective action process are listed in Table I-1.

  16. Indoxacarb, Metaflumizone, and Other Sodium Channel Inhibitor Insecticides: Mechanism and Site of Action on Mammalian Voltage-Gated Sodium Channels

    PubMed Central

    von Stein, Richard T.; Silver, Kristopher S.; Soderlund, David M.

    2013-01-01

    Sodium channel inhibitor (SCI) insecticides were discovered almost four decades ago but have only recently yielded important commercial products (eg., indoxacarb and metaflumizone). SCI insecticides inhibit sodium channel function by binding selectively to slow-inactivated (non-conducting) sodium channel states. Characterization of the action of SCI insecticides on mammalian sodium channels using both biochemical and electrophysiological approaches demonstrates that they bind at or near a drug receptor site, the "local anesthetic (LA) receptor." This mechanism and site of action on sodium channels differentiates SCI insecticides from other insecticidal agents that act on sodium channels. However, SCI insecticides share a common mode of action with drugs currently under investigation as anticonvulsants and treatments for neuropathic pain. In this paper we summarize the development of the SCI insecticide class and the evidence that this structurally diverse group of compounds have a common mode of action on sodium channels. We then review research that has used site-directed mutagenesis and heterologous expression of cloned mammalian sodium channels in Xenopus laevis oocytes to further elucidate the site and mechanism of action of SCI insecticides. The results of these studies provide new insight into the mechanism of action of SCI insecticides on voltage-gated sodium channels, the location of the SCI insecticide receptor, and its relationship to the LA receptor that binds therapeutic SCI agents. PMID:24072940

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-08-01

    Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were

  18. Corrective Action Decision Document/Closure Report for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Strand

    2006-05-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 219, Septic Systems and Injection Wells, in Areas 3, 16, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 219 is comprised of the following corrective action sites (CASs): (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. The purpose of this Corrective Action Decision Document/Closure Report ismore » to provide justification and documentation supporting the recommendation for closure of CAU 219 with no further corrective action beyond the application of a use restriction at CASs 16-04-01, 16-04-02, and 16-04-03. To achieve this, corrective action investigation (CAI) activities were performed from June 20 through October 12, 2005, as set forth in the CAU 219 Corrective Action Investigation Plan and Record of Technical Change No. 1. A best management practice was implemented at CASs 16-04-01, 16-04-02, and 16-04-03, and corrective action was performed at CAS 23-20-01 between January and April 2006. In addition, a use restriction will be applied to CASs 16-04-01, 16-04-02, and 16-04-03 to provide additional protection to Nevada Test Site personnel. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 219 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data

  19. Drinking-driving patterns at night : baseline roadside survey of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1974-01-01

    As part of the Fairfax Alcohol Safety Action Project (ASAP), staff members of the Virginia Highway Research Council, acting in their role as evaluators of the project, conducted a baseline survey of the nighttime drinking-driving patterns in Fairfax,...

  20. [Environmental characterization of the National Contaminated Sites in SENTIERI project].

    PubMed

    Musmeci, L; Bellino, M; Falleni, F; Piccardi, A

    2011-01-01

    The concept of "polluted site" was firstly introduced in Italy with the definition of "environmental high risk areas" (Rule 349/86). Later, the decree 471/99 stated that a site is considered polluted if the concentration of even just one index pollutant in anyone of the matrices (soil or subsoil, surface or ground waters) exceeds the allowable threshold limit concentration. The boundaries of Italian polluted sites (IPS) were defined (Decree 152/06) on the basis of health, environmental and social criteria. SENTIERI Project includes 44 out of the 57 sites comprised in the "National environmental remediation program"; they correspond to the largest national industrial agglomerates. For each site, characterization data were collected, classified and arranged in tables. A great part of collected data came also from the environmental remediation programmes planned for the sites. These plans show that characterization and risk assessment activities were mainly undertaken for private industrial areas, as they were considered source of pollution. On the other hand, municipal and/or green and agricultural areas included in IPSs were poorly studied. Therefore, it is difficult to assess the exposure of the populations living inside and/or near the IPSs. The most probable population exposure come from the contamination of ground waters utilized for irrigation, or industrial emissions. For a description of SENTIERI, refer to the 2010 Supplement of Epidemiology & Prevention devoted to SENTIERI Project.

  1. Participatory Action Research: Reflections on Critical Incidents in a PAR Project.

    ERIC Educational Resources Information Center

    Santelli, Betsy; Singer, George H. S.; DiVenere, Nancy; Ginsberg, Connie; Powers, Laurie E.

    1998-01-01

    This article describes a participatory action research (PAR) project designed to evaluate Parent to Parent programs in five states. The process of developing a shared understanding of the program and of the purpose for evaluating them, along with an on-going willingness of parents and researchers to compromise, led to creative solutions to…

  2. I Play, Therefore I Am: An Undergraduate Philosophical Action Research Project.

    ERIC Educational Resources Information Center

    Stoll, Sharon Kay; Beller, Jennifer M.; Mathews, Allison; Matthews, Julie; Trainer, Maria; Freitas, Brandon; McLaughlin, Casey; Milke, Mary

    2000-01-01

    Asked undergraduate students' opinions of Descartes' belief that the mind and body are separate, then had them conduct action research projects examining whether the mind-body dilemma might be overcome if teachers valued the essential nature of play and applied it to sport and physical education. Results supported the hypothesis that physical…

  3. California state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.« less

  4. Oregon state information handbook formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  5. Iowa state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.« less

  6. Oregon state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  7. Pennsylvania state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  8. Toward Solutions: The Work of the Chemistry Action-Research Group. Learning in Science Project. Working Paper No. 35.

    ERIC Educational Resources Information Center

    Osborne, Roger; And Others

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Chemistry Action-Research Group considered problems related to the teaching and learning of ideas associated with particles and physical/chemical changes. Based on findings during the…

  9. 76 FR 30696 - Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-26

    ... DEPARTMENT OF ENERGY Reimbursement for Costs of Remedial Action at Active Uranium and Thorium...) acceptance of claims in FY 2011 from eligible active uranium and thorium processing site licensees for... incurred by licensees at active uranium and thorium processing sites to remediate byproduct material...

  10. What Is My Role? Establishing Teacher and Youth Worker Responsibilities in Social Action Projects

    ERIC Educational Resources Information Center

    Epstein, Shira Eve

    2013-01-01

    In this research, I analyze the roles of teachers and youth workers from a community-based organization in the context of two high school social action projects. Both the teachers and the youth workers assumed distinct roles while working together during the civic project enactments. The teachers were largely positioned as responsible for…

  11. Culminating Experience Action Research Projects, Volume 8, Part 1, Spring 2006

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  12. Culminating Experience Action Research Projects, Volume 15, Part 1, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  13. Culminating Experience Action Research Projects, Volume 16, Part 1, Spring 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  14. ENVIRONMENTAL METHODS TESTING SITE PROJECT: DATA MANAGEMENT PROCEDURES PLAN

    EPA Science Inventory

    The Environmental Methods Testing Site (EMTS) Data Management Procedures Plan identifies the computer hardware and software resources used in the EMTS project. It identifies the major software packages that are available for use by principal investigators for the analysis of data...

  15. 76 FR 79675 - Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting On January 18, 2012, Office of Energy Projects staff will hold a site visit and technical meeting for the proposed Pomperaug Hydro Project (FERC...

  16. SITE project. Phase 1: Continuous data bit-error-rate testing

    NASA Technical Reports Server (NTRS)

    Fujikawa, Gene; Kerczewski, Robert J.

    1992-01-01

    The Systems Integration, Test, and Evaluation (SITE) Project at NASA LeRC encompasses a number of research and technology areas of satellite communications systems. Phase 1 of this project established a complete satellite link simulator system. The evaluation of proof-of-concept microwave devices, radiofrequency (RF) and bit-error-rate (BER) testing of hardware, testing of remote airlinks, and other tests were performed as part of this first testing phase. This final report covers the test results produced in phase 1 of the SITE Project. The data presented include 20-GHz high-power-amplifier testing, 30-GHz low-noise-receiver testing, amplitude equalization, transponder baseline testing, switch matrix tests, and continuous-wave and modulated interference tests. The report also presents the methods used to measure the RF and BER performance of the complete system. Correlations of the RF and BER data are summarized to note the effects of the RF responses on the BER.

  17. The Impact of a Dual-Project Action Learning Program: A Case of a Large IT Manufacturing Company in South Korea

    ERIC Educational Resources Information Center

    Yoon, Hyung Joon; Cho, Yonjoo; Bong, Hyeon-Cheol

    2012-01-01

    The primary purpose of this article is to evaluate the impact of a dual-project action learning program (DPALP) conducted in South Korea. A dual-project program requires each participant to carry out both team and individual projects. Cho and Egan's [2009. Action learning research: A systematic review and conceptual framework. "Human Resource…

  18. Corrective Action Investigation Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada (December 2002, Revision No.: 0), Including Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NSO

    The Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 204 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 204 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of six Corrective Action Sites (CASs) which include: 01-34-01, Underground Instrument House Bunker; 02-34-01, Instrument Bunker; 03-34-01, Underground Bunker; 05-18-02, Chemical Explosives Storage; 05-33-01, Kay Blockhouse; 05-99-02, Explosive Storage Bunker.more » Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for Corrective Action Unit 204 collectively include radionuclides, beryllium, high explosives, lead, polychlorinated biphenyls, total petroleum hydrocarbons, silver, warfarin, and zinc phosphide. The primary question for the investigation is: ''Are existing data sufficient to evaluate appropriate corrective actions?'' To address this question, resolution of two decision statements is required. Decision I is to ''Define the nature of contamination'' by identifying any contamination above preliminary action levels (PALs); Decision II is to ''Determine the extent of contamination identified above PALs. If PALs are not exceeded, the investigation is completed. If PALs are exceeded, then Decision II must be resolved. In addition, data will be obtained to support waste management decisions. Field activities will include radiological land area surveys, geophysical surveys to identify any subsurface metallic and nonmetallic debris, field screening for applicable contaminants of potential concern, collection and analysis of surface and subsurface soil samples from biased locations, and step-out sampling to define the extent of

  19. Summary of operations and performance of the Murdock site restoration project in 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of amore » small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A

  20. Corrective Action Decision Document for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-05-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, at the Nevada Test Site, Nevada, according to the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 151 is comprised of eight corrective action sites (CASs): (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). The purpose of this Corrective Action Decision Document ismore » to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for each of the eight CASs within CAU 151. Corrective action investigation (CAI) activities were performed from September 12 through November 18, 2005, as set forth in the CAU 151 Corrective Action Investigation Plan and Record of Technical Change No. 1. Additional confirmation sampling was performed on December 9, 2005; January 10, 2006; and February 13, 2006. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern for each CAS. The results of the CAI identified contaminants of concern at two of the eight CASs in CAU 151 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 151 revealed the following: (1) Soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 12-47-01, 18-03-01, 18-99-09, and Lagoons B through G of CAS 12-03-01 do not contain contamination at concentrations exceeding the FALs. (2) Lagoon A of CAS 12-03-01 has arsenic above FALs in shallow subsurface soils. (3) One of the two tanks of CAS 12-04-01, System No.1, has polychlorinated biphenyls (aroclor-1254), trichloroethane, and cesium-137 above FALs in the sludge. Both CAS 12-04-01, System No.1 tanks

  1. Culminating Experience Action Research Projects, Volume 18, Part 1, Spring 2016

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.

    2017-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience or with school employment. This course, Education…

  2. Culminating Experience Action Research Projects, Volume 18, Part 2, Spring 2016

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.

    2018-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience or with school employment. This course, Education…

  3. Action of insecticidal N-alkylamides at site 2 of the voltage-sensitive sodium channel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ottea, J.A.; Payne, G.T.; Soderlund, D.M.

    1990-08-01

    Nine synthetic N-alkylamides were examined as inhibitors of the specific binding of ({sup 3}H)batrachotoxinin A 20{alpha}-benzoate (({sup 3}H)BTX-B) to sodium channels and as activators of sodium uptake in mouse brain synaptoneurosomes. In the presence of scorpion (Leiurus quinquestriatus) venom, the six insecticidal analogues were active as both inhibitors of ({sup 3}H)BTX-B binding and stimulators of sodium uptake. These findings are consistent with an action of these compounds at the alkaloid activator recognition site (site 2) of the voltage-sensitive sodium channel. The three noninsecticidal N-alkylamides also inhibited ({sup 3}H)BTX-B binding but were ineffective as activators of sodium uptake. Concentration-response studies revealedmore » that some of the insecticidal amides also enhanced sodium uptake through a second, high-affinity interaction that does not involve site 2, but this secondary effect does not appear to be correlated with insecticidal activity. The activities of N-alkylamides as sodium channel activators were influenced by the length of the alkenyl chain and the location of unsaturation within the molecule. These results further define the actions of N-alkylamides on sodium channels and illustrate the significance of the multiple binding domains of the sodium channel as target sites for insect control agents.« less

  4. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less

  5. An Action Research Project Exploring the Psychology Curriculum and Transitions to Employment

    ERIC Educational Resources Information Center

    McMurray, Isabella; Roberts, Pat; Robertson, Ian; Teoh, Kevin

    2011-01-01

    Within the UK, traditional subject-specific areas are increasingly being complemented by the provision of opportunities to foster students' personal development planning as an aide to support their future employment and lifelong learning. This paper describes an action research project which examined employability skills within a psychology…

  6. Alcohol safety action projects evaluation of operations : data, table of results, and formulation

    DOT National Transportation Integrated Search

    1979-06-01

    This volume contains the data used in the evaluation of 35 Alcohol Safety Action Projects implemented throughout the country. Historical background, discussion of analytic results and factors affecting impact detecion are contained in the document ti...

  7. Conceptualizing Indicator Domains for Evaluating Action Research

    ERIC Educational Resources Information Center

    Piggot-Irvine, Eileen; Rowe, Wendy; Ferkins, Lesley

    2015-01-01

    The focus of this paper is to share thinking about meta-level evaluation of action research (AR), and to introduce indicator domains for assessing and measuring inputs, outputs and outcomes. Meta-level and multi-site evaluation has been rare in AR beyond project implementation and participant satisfaction. The paper is the first of several…

  8. The Research to Action Project: Applied Workplace Solutions for Nurses.

    PubMed

    Silas, Linda

    2012-03-01

    The number of new nurses entering the profession has increased, but the need to retain nurses in the profession continues to be a critical priority. The consequences of the nursing shortage are reflected in continued high levels of overtime, absenteeism and turnover. The Canadian Federation of Nurses Unions (CFNU), in partnership with the Canadian Nurses Association, the Canadian Healthcare Association and the Dietitians of Canada, initiated the project Research to Action: Applied Workplace Solutions for Nurses (RTA). The RTA initiative comprised research-based pilot projects, implemented in 10 jurisdictions across the country, that aimed to improve workplaces and increase the retention and recruitment of nurses. Unions, employers, governments, universities and professional associations came together in an unprecedented show of collaboration. Lessons and knowledge were shared among the projects, which were evaluated for their viability in other jurisdictions and professions. The pilots led to increased leadership, engagement and professional development, and decreased overtime, absenteeism and turnover.

  9. Corrective Action Decision Document/Closure Report for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2010-04-01

    Corrective Action Unit 560 comprises seven corrective action sites (CASs): •03-51-01, Leach Pit •06-04-02, Septic Tank •06-05-03, Leach Pit •06-05-04, Leach Bed •06-59-03, Building CP-400 Septic System •06-59-04, Office Trailer Complex Sewage Pond •06-59-05, Control Point Septic System The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 560 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from October 7, 2008, through February 24, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, and Recordmore » of Technical Change No. 1. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: •Determine whether contaminants of concern (COCs) are present. •If COCs are present, determine their nature and extent. •Provide sufficient information and data to complete appropriate corrective actions. The CAU 560 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: •No contamination exceeding the FALs was identified at CASs 03-51-01, 06-04-02, and 06-59-04. •The soil at the base of the leach pit chamber at CAS 06-05-03 contains arsenic above the FAL of 23 milligrams per kilogram (mg/kg) and polychlorinated biphenyl (PCBs) above the FAL of 0.74 mg/kg, confined vertically from a depth of approximately 5 to 20 feet (ft) below ground surface. The contamination is confined laterally to the walls

  10. Critical management practices influencing on-site waste minimization in construction projects.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. Corrective Action Investigation Plan for Corrective Action Unit 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada (Rev. No.: 0, August 2002)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Offices's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 127 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 127 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of 12 Corrective Action Sites (CASs) located at Test Cell C; the Engine Maintenance, Assembly, and Disassembly (E-MAD) Facility; the X-Tunnel in Area 25; the Pluto Disassembly Facility; themore » Pluto Check Station; and the Port Gaston Training Facility in Area 26. These CASs include: CAS 25-01-05, Aboveground Storage Tank (AST); CAS 25-02-02, Underground Storage Tank (UST); CAS 25-23-11, Contaminated Materials; CAS 25-12-01, Boiler; CAS 25-01-06, AST; CAS 25-01-07, AST; CAS 25-02-13, UST; CAS 26- 01-01, Filter Tank (Rad) and Piping; CAS 26-01-02, Filter Tank (Rad); CAS 26-99-01, Radioactively Contaminated Filters; CAS 26-02-01, UST; CAS 26-23-01, Contaminated Liquids Spreader. Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for CAU 127 include radionuclides, metals, total petroleum hydrocarbons, volatile organic compounds, asbestos, and polychlorinated biphenyls. Additionally, beryllium may be present at some locations. The sources of potential releases are varied, but releases of contaminated liquids may have occurred and may have migrated into and impacted soil below and surrounding storage vessels at some of the CASs. Also, at several CASs, asbestos-containing materials may be present on the aboveground structures and may be friable. Exposure pathways are limited to ingestion, inhalation, and dermal contact (adsorption) of soils/sediments or liquids, or inhalation of contaminants by site workers due to disturbance

  12. Water Resources Improvement Study, Buttermilk Bay Channel, Bourne, Massachusetts; Small Navigation Project, Detailed Project Report, and Environmental Assessment.

    DTIC Science & Technology

    1982-12-01

    Disposal Alternatives 31 Open Water Disposal 31 Land Disposal Alternative 32 No Action Alternative 32 ENVIRONM4ENTAL SETTING 33 General 33 Fisheries 33...involve open water disposal of dredged sand and gravel at the Buzzards Bay dump site, located 9.8 miles south of the project site, southeast of...towed 9.8 miles south to the Buzzards Bay dunip site for open water disposal. The present character of the Buzzards day dump site would not be

  13. St. Louis Airport Site. Annual site environmental report, calendar year 1985. Formerly Utilized Sites Remedial Action Program (FUSRAP). Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-09-01

    During 1985, the environmental monitoring program was continued at the St. Louis Airport Site (SLAPS) in St. Louis County, Missouri. The ditches north and south of the site have been designated for cleanup as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The monitoring program at the SLAPS measures radon gas concentrations in air; external gamma radiation dose rates; and uranium, thorium, and radium concentrations in surface water, groundwater, and sediment. Potential radiation doses to the public are also calculated. Because the site is not controlled or regulated by the DOE, the DOE Derived Concentration Guides (DCGs) aremore » not applicable to SLAPS, but are included only as a basis for comparison. The DOE DCGs and the DOE radiation protection standard have been revised. (Appendix B). During 1985, annual average radon levels in air at the SLAPS were below the DCG for uncontrolled areas. External gamma monitoring in 1985 showed measured annual gamma dose rates ranging from 3 to 2087 mrem/y, with the highest value occurring in an area known to be contaminated. The calculated maximum dose at the site boundary, assuming limited occupancy, would be 6 mrem/y. Average annual concentrations of /sup 230/Th, /sup 226/Ra, and total uranium in surface waters remained below the DOE DCG. The on-site groundwater measurements showed that average annual concentrations of /sup 230/Th, /sup 226/Ra and total uranium were within the DOE DCGs. Although there are no DCGs for sediments, all concentrations of total uraniu, /sup 230/Th, and /sup 226/Ra were below the FUSRAP Guidelines.« less

  14. The Charlotte Action Research Project: A Model for Direct and Mutually Beneficial Community-University Engagement

    ERIC Educational Resources Information Center

    Morrell, Elizabeth; Sorensen, Janni; Howarth, Joe

    2015-01-01

    This article describes the evolution of the Charlotte Action Research Project (CHARP), a community-university partnership founded in 2008 at the University of North Carolina at Charlotte, and focuses particularly on the program's unique organizational structure. Research findings of a project evaluation suggest that the CHARP model's unique…

  15. Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick and Sloop, Christy

    2011-04-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action ismore » needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high

  16. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less

  17. Sexual health promotion on social networking sites: a process evaluation of The FaceSpace Project.

    PubMed

    Nguyen, Phuong; Gold, Judy; Pedrana, Alisa; Chang, Shanton; Howard, Steve; Ilic, Olivia; Hellard, Margaret; Stoove, Mark

    2013-07-01

    This article reports findings from an evaluation of reach and engagement of The FaceSpace Project, a novel sexual health promotion project delivered through social networking sites that targeted young people aged 16-29 years. Multiple methods were used to evaluate project reach and engagement. The evaluation focussed on quantitative data (online usage statistics, online surveys), complemented by available qualitative data (project team meeting notes). The project reached 900 fans who were mostly between 18 and 34 years of age. The most successful ways of increasing audience reach were via Facebook advertisements and tagging photos of young people attending a music festival on the project Facebook page. Peaks in Facebook page interactions (comments and "likes") coincided with recruitment peaks and when videos were posted. However, video views varied greatly between postings. Feedback from the project team for increasing engagement in future social networking site interventions included having one centralized Facebook page and using episodic videos. This evaluation is among the first to assess the use of social networking sites for sexual health promotion and provides information to inform the implementation and evaluation of future projects using new media. Social networking sites offer great potential to reach and engage young people for sexual health promotion. However, further work is required to improve implementation and promote audience reach and engagement as well as to determine effectiveness of social networking sites in changing knowledge, attitudes, and behaviors. Copyright © 2013 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  18. Action-projection in Japanese conversation: topic particles wa, mo, and tte for triggering categorization activities

    PubMed Central

    Tanaka, Hiroko

    2015-01-01

    Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565

  19. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of the effect of the proposed changes on existing tenants. (6) In the case of a plan of action involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... summary, the local HUD field office, and the on-site office for the project, or if one is not available...

  20. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of the effect of the proposed changes on existing tenants. (6) In the case of a plan of action involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... summary, the local HUD field office, and the on-site office for the project, or if one is not available...

  1. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... of the effect of the proposed changes on existing tenants. (6) In the case of a plan of action involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... summary, the local HUD field office, and the on-site office for the project, or if one is not available...

  2. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... of the effect of the proposed changes on existing tenants. (6) In the case of a plan of action involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... summary, the local HUD field office, and the on-site office for the project, or if one is not available...

  3. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... of the effect of the proposed changes on existing tenants. (6) In the case of a plan of action involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... summary, the local HUD field office, and the on-site office for the project, or if one is not available...

  4. High School to College Transition among Black Males: An Action Research Project

    ERIC Educational Resources Information Center

    Jewett, Orval Albert

    2017-01-01

    A participatory action research project involving social workers as stakeholders from high schools and the local community college in Nassau County, New York, provided the basis for an inquiry that addressed the effectiveness and implementation of clinical social work practice with Black male students transitioning to community college from high…

  5. Transforming ESL Teachers' Perspective on Media Literacy: An Action Research Project

    ERIC Educational Resources Information Center

    Rodriguez Sanchez, Doralis

    2017-01-01

    Transforming ESL teachers' perspective on media literacy: An action research project was carried out at a Puerto Rico Department of Education (PRDE) public high school in the Metropolitan area. The participants of the study were five ESL teachers. Professional development was the intervention used in this study. The participants were introduced to…

  6. Historic Manhattan Project Sites at Los Alamos

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGehee, Ellen

    The Manhattan Project laboratory constructed at Los Alamos, New Mexico, beginning in 1943, was intended from the start to be temporary and to go up with amazing speed. Because most of those WWII-era facilities were built with minimal materials and so quickly, much of the original infrastructure was torn down in the late '40s and early '50s and replaced by more permanent facilities. However, a few key facilities remained, and are being preserved and maintained for historic significance. Four such sites are visited briefly in this video, taking viewers to V-Site, the buildings where the first nuclear explosive device wasmore » pre-assembled in preparation for the Trinity Test in Southern New Mexico. Included is another WWII area, Gun Site. So named because it was the area where scientists and engineers tested the so-called "gun method" of assembling nuclear materials -- the fundamental design of the Little Boy weapon that was eventually dropped on Hiroshima. The video also goes to Pajarito Site, home of the "Slotin Building" and "Pond Cabin." The Slotin Building is the place where scientist Louis Slotin conducted a criticality experiment that went awry in early 1946, leading to his unfortunate death, and the Pond Cabin served the team of eminent scientist Emilio Segre who did early chemistry work on plutonium that ultimately led to the Fat Man weapon.« less

  7. Historic Manhattan Project Sites at Los Alamos

    ScienceCinema

    McGehee, Ellen

    2018-05-11

    The Manhattan Project laboratory constructed at Los Alamos, New Mexico, beginning in 1943, was intended from the start to be temporary and to go up with amazing speed. Because most of those WWII-era facilities were built with minimal materials and so quickly, much of the original infrastructure was torn down in the late '40s and early '50s and replaced by more permanent facilities. However, a few key facilities remained, and are being preserved and maintained for historic significance. Four such sites are visited briefly in this video, taking viewers to V-Site, the buildings where the first nuclear explosive device was pre-assembled in preparation for the Trinity Test in Southern New Mexico. Included is another WWII area, Gun Site. So named because it was the area where scientists and engineers tested the so-called "gun method" of assembling nuclear materials -- the fundamental design of the Little Boy weapon that was eventually dropped on Hiroshima. The video also goes to Pajarito Site, home of the "Slotin Building" and "Pond Cabin." The Slotin Building is the place where scientist Louis Slotin conducted a criticality experiment that went awry in early 1946, leading to his unfortunate death, and the Pond Cabin served the team of eminent scientist Emilio Segre who did early chemistry work on plutonium that ultimately led to the Fat Man weapon.

  8. Institutionalization of community action projects to reduce alcohol-use related problems: systematic facilitators.

    PubMed

    Holder, H D; Moore, R S

    2000-01-01

    This article reviews papers from a recent conference on community action research in order to identify factors that contribute to long-term maintenance, sustainability, or institutionalization of community project interventions. The descriptions of long-term outcomes and aftereffects of projects that emerged in the conference are valuable because relatively few instances of institutionalization have been documented in the scientific literature. After a general theoretical discussion of institutionalization in communities, the article identifies characteristics of successful community action programs that outlived their original funding. These characteristics include honoring community values and cultural relevance, cultivating key leader support, and utilizing indigenous staff. They also include developing local resources, maintaining flexibility, and leveraging prior success. The paper concludes by noting that aiming for policy and structural changes is a goal for an institutionalization of measures positively affecting desired health outcomes, even if the programs which created them are not themselves sustained.

  9. Corrective Action Sites around the Nation

    EPA Pesticide Factsheets

    Provide info to the public/community orgs, local officials & consultants on nearby corrective action cleanups, the status of the cleanup and future plans. Links to the Natl Corrective Action, Cleanups in My Community & Cleaning Up Our Land, Water & Air

  10. Nurse-led action research project for expanding nurses' role in patient education in Iran: Process, structure, and outcomes.

    PubMed

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses' role in patient education in Iran. This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a "core research support team," "two steering committees," and community representatives of clients and professionals as "feedback groups." A seven-stage process, named the "Nurse Educators: Al-Zahra Role Expansion Action Research" (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. A nurse-led ad hoc structure with academic-clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses' educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system policy makers in a wider range of practice.

  11. Nurse-led action research project for expanding nurses’ role in patient education in Iran: Process, structure, and outcomes

    PubMed Central

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Background: Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses’ role in patient education in Iran. Materials and Methods: This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. Results: A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a “core research support team,” “two steering committees,” and community representatives of clients and professionals as “feedback groups.” A seven-stage process, named the “Nurse Educators: Al-Zahra Role Expansion Action Research” (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. Conclusions: A nurse-led ad hoc structure with academic–clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses’ educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system

  12. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... on Sunrise Project, I-205 to Rock Creek Junction: Clackamas County, OR AGENCY: Federal Highway.... 139(l)(1). The actions relate to a proposed highway project, Sunrise Project, I-205 to Rock Creek... Project, I-205 to Rock Creek Junction Final Environmental Impact Statement, Record of Decision and other...

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  14. New Mexico state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description ofmore » the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  15. Youth Action Teams: An Approach to Student Involvement. Technical Assistance Bulletin 33.

    ERIC Educational Resources Information Center

    National School Resource Network, Washington, DC.

    Youth Action Teams have been implemented in over 14 sites across the country in the past few years. Such teams are made up of a diverse group of youth working together on a project through the school, a youth service organization, a community organization, or the government. The team decides its focus, and what projects its members wish to…

  16. Corrective Action Investigation Plan for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada Test Site, Nevada with Errata and ROTC 1, Rev. No. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCord, John; Marutzky, Sam

    2004-12-01

    This Corrective Action Investigation Plan (CAIP) was developed for Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain. The CAIP is a requirement of the ''Federal Facility Agreement and Consent Order'' (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD) (FFACO, 1996). The FFACO addresses environmental restoration activities at U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) facilities and sites including the underground testing area(s) of the Nevada Test Site (NTS). This CAIP describes the investigation activities currently planned for the Rainier Mesa/Shoshone Mountain CAU.more » These activities are consistent with the current Underground Test Area (UGTA) Project strategy described in Section 3.0 of Appendix VI, Revision No. 1 (December 7, 2000) of the FFACO (1996) and summarized in Section 2.1.2 of this plan. The Rainier Mesa/Shoshone Mountain CAU extends over several areas of the NTS (Figure 1-1) and includes former underground nuclear testing locations in Areas 12 and 16. The area referred to as ''Rainier Mesa'' includes the geographical area of Rainier Mesa proper and the contiguous Aqueduct Mesa. Figure 1-2 shows the locations of the tests (within tunnel complexes) conducted at Rainier Mesa. Shoshone Mountain is located approximately 20 kilometers (km) south of Rainier Mesa, but is included within the same CAU due to similarities in their geologic setting and in the nature and types of nuclear tests conducted. Figure 1-3 shows the locations of the tests conducted at Shoshone Mountain. The Rainier Mesa/Shoshone Mountain CAU falls within the larger-scale Rainier Mesa/Shoshone Mountain Investigation Area, which also includes the northwest section of the Yucca Flat CAU as shown in Figure 1-1. Rainier Mesa and Shoshone Mountain lie adjacent to the Timber Mountain Caldera Complex and are composed of volcanic rocks that erupted from

  17. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irene Farnham

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less

  18. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  19. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a

  20. [Difference in action sites between mecamylamine and hexamethonium on nicotinic receptors of sympathetic neurons].

    PubMed

    Liu, Wei; Zheng, Jian-Quan; Liu, Zhen-Wei; Li, Li-Jun; Wan, Qin; Liu, Chuan-Gui

    2002-12-25

    To compare the difference in action sites between mecamylamine (MEC) and hexamethonium (HEX) on nicotinic receptors of sympathetic neurons, we investigated the effects of MEC and HEX on the nicotine-induced currents in cultured superior cervical ganglion neurons by whole-cell patch clamp technique. The IC(50) of MEC and HEX for antagonizing the effect of 0.08 mmol/L nicotine was 0.0012 and 0.0095 mmol/L, respectively. Both MEC and HEX accelerated the desensitization of nicotinic receptors. Furthermore, by comparing their effects at holding potentials 30, 70 and 110 mV, it was indicated that their suppressing effect on the nicotine-induced currents was voltage-dependent. However, different from that of HEX, the inhibitory effect of MEC increased with administering the mixture of MEC and nicotine at intervals of 3 min, indicating a use-dependent effect of MEC. It is concluded that the action site of MEC on nicotinic receptors of sympathetic neurons is different from that of HEX.

  1. Site Studies for the SuperB Collider and Synchrotron Radiation Facility Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tomassini, S.; Biagini, M.E.; Raimondi, P.

    2012-04-26

    The SuperB complex project aims at the construction of a very high luminosity (10{sup 36} cm{sup -2}s{sup -1}) asymmetric e{sup +}e{sup -} B-factory and a few X-ray synchrotron beam lines (SR). The project has been recently approved by the Italian Government as part of the National Research Plan. The Tor Vergata University location has been chosen and a Consortium among INFN, University of Rome II Tor Vergata and the Research Ministry is being signed, allowing for the constitution of the 'Cabibbo Laboratory', where the SuperB project will be hosted. This paper presents and describes the status of the preliminary designmore » of the site layout, related issues for the chosen site and the preliminary ground motion (GM) measurement results.« less

  2. Report: Assessment of EPA’s Projected Pollutant Reductions Resulting from Enforcement Actions and Settlements

    EPA Pesticide Factsheets

    Report #2007-B-00002, July 24, 2007. The accuracy and reliability of EPA’s projected pollutant reductions for Fiscal Years 2003-2006 were dependent on the specific program in which the enforcement action took place.

  3. Bonebrake Theological Seminary - Most Secret A-Bomb Project Site

    NASA Astrophysics Data System (ADS)

    Sopka, Katherine R.; Sopka, Elisabeth M.

    2004-05-01

    In late 1943, a small number of nuclear scientists was urgently assembled in Dayton, Ohio by the U.S. Army Manhattan District Engineers and Monsanto Chemical Company Research Division to set up a top secret research project essential to counteract the German atomic bomb threat. The site chosen was an old stone building built in 1879 by the United Brethren Church in a residential area known locally as the Bonebrake Seminary. Centered on a sizeable open plot, the austere three story building was surrounded by a tall cyclone fence with a narrow gate and a minimal guard post - nothing revealed the site's intense research activity then or even in the post-WWII Cold War period. Bonebrake scientists would produce the highly radioactive polonium sources for the plutonium (Pu-239) bomb igniter used in August over Nagasaki just before the end of WWII against Japan. The existence of Bonebrake and its research/production work remained classified top secret throughout the Cold War. Only in recent times can any reference be found even to the existence of this project (unlike , for example, Los Alamos or Oak Ridge) and few, if any details, have ever been published. The primary source of information for this paper is Dr. John J. Sopka who was recruited from Princeton University by the Manhattan District in 1943 as physicist for this project.

  4. $250,000 Emergency Action Memo from Steve Spurlin, EPA Region 4 to Addressees. Documenting the Decision to Initiate Emergency Response Actions at the Site

    EPA Pesticide Factsheets

    Contains July 18, 2007 memo about the decision to initiate emergency response actions for the American Drum & Pallet Site·tocated in Memphis, Shelby County, Tennessee. Region ID: 04 DocID: 10517021, DocDate: 07-18-2007

  5. Diverse Actions and Target-Site Selectivity of Neonicotinoids: Structural Insights

    PubMed Central

    Matsuda, Kazuhiko; Kanaoka, Satoshi; Akamatsu, Miki; Sattelle, David B.

    2009-01-01

    The nicotinic acetylcholine receptors (nAChRs) are targets for human and veterinary medicines as well as insecticides. Subtype-selectivity among the diverse nAChR family members is important for medicines targeting particular disorders, and pest-insect selectivity is essential for the development of safer, environmentally acceptable insecticides. Neonicotinoid insecticides selectively targeting insect nAChRs have important applications in crop protection and animal health. Members of this class exhibit strikingly diverse actions on their nAChR targets. Here we review the chemistry and diverse actions of neonicotinoids on insect and mammalian nAChRs. Electrophysiological studies on native nAChRs and on wild-type and mutagenized recombinant nAChRs have shown that basic residues particular to loop D of insect nAChRs are likely to interact electrostatically with the nitro group of neonicotinoids. In 2008, the crystal structures were published showing neonicotinoids docking into the acetylcholine binding site of molluscan acetylcholine binding proteins with homology to the ligand binding domain (LBD) of nAChRs. The crystal structures showed that 1) glutamine in loop D, corresponding to the basic residues of insect nAChRs, hydrogen bonds with the NO2 group of imidacloprid and 2) neonicotinoid-unique stacking and CH-π bonds at the LBD. A neonicotinoid-resistant strain obtained by laboratory-screening has been found to result from target site mutations, and possible reasons for this are also suggested by the crystal structures. The prospects of designing neonicotinoids that are safe not only for mammals but also for beneficial insects such as honey bees (Apis mellifera) are discussed in terms of interactions with non-α nAChR subunits. PMID:19321668

  6. Science in Action: How Middle School Students Are Changing Their World through STEM Service-Learning Projects

    ERIC Educational Resources Information Center

    Newman, Jane L.; Dantzler, John; Coleman, April N.

    2015-01-01

    The purpose of Science in Action (SIA) was to examine the relationship between implementing quality science, technology, engineering, and math (STEM) service-learning (SL) projects and the effect on students' academic engagement in middle school science, civic responsibility, and resilience to at-risk behaviors. The innovative project funded by…

  7. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andersson, J.

    1993-12-31

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reasonmore » for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments.« less

  8. Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, Cliff; Castillo, Darina; Fatherly, Nicki

    The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge,more » and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and

  9. Research from Afar: Considerations for Conducting an Off-Site Research Project.

    ERIC Educational Resources Information Center

    Williams, Reg Arthur; Hagerty, Bonnie M.; Hoyle, Kenneth; Yousha, Steven M.; Abdoo, Yvonne; Andersen, Curt; Engler, Dorothy

    1999-01-01

    Critical elements in the success of off-site research projects include the following: negotiation, attention to personnel issues, communication, participation of research subjects, data management, and concern for privacy issues. (SK)

  10. Corrective Action Decision Document/Closure Report for Corrective Action Unit 482: Area 15 U15a/e Muckpiles and Ponds Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document /Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 482 U15a/e Muckpiles and Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 482 is comprised of three Corrective Action Sites (CASs) and one adjacent area: CAS 15-06-01, U15e Muckpile; CAS 15-06-02, U15a Muckpile; CAS 15-38-01, Area 15 U15a/e Ponds; and Drainage below the U15a Muckpile. The purpose of thismore » CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further corrective action, by placing use restrictions on the three CASs and the adjacent area of CAU 482. To support this recommendation, a corrective action investigation (CAI) was performed in September 2002. The purpose of the CAI was to fulfill the following data needs as defined during the Data Quality Objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to determine appropriate corrective actions. The CAU 482 dataset from the CAI was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Tier 2 FALS were determined for the hazardous constituents of total petroleum hydrocarbons (TPH)-diesel-range organics (DRO) and the radionuclides americium (Am)-241, cesium (Cs)-137, plutonium (Pu)-238, and Pu-239. The Tier 2 FALs were calculated for the radionuclides using site-specific information. The hazardous constituents of TPH-DRO were compared to the

  11. Development of professional knowledge in action: experiences from an action science design focusing on acknowledging communication in mental health.

    PubMed

    Vatne, Solfrid; Bjornerem, Heidi; Hoem, Elisabeth

    2009-03-01

    This article reports a multi-professional development project that was based on an action science design. The purpose was to develop 'acknowledging communication' in a psychiatric department for young people, and the objective to study the staffs' experiences of participating in the project. The professional part of the project has its foundation in Schibbye's treatment theory of inter-subjective understanding of relationships, and involves three main approaches from her theory: self-reflection, self-delimitation and emotional presence. The article presents the specific action design used, where reflection processes were developed in three different arenas: multidisciplinary Reflection groups, a Leader support group for the group leaders of the Reflection groups and collective Project seminars for all employees. A formal study programme designed to increase professional expertise, 15 European Credit Transfer System (ECTS), was also offered. The research methods included the researcher's process notes taken during the process, field notes from participating in the Leader support group, and qualitative interviews of eight informants participating in the various reflection arenas. The article presents and discusses the experiences evolved from the methods that were developed during the professional action science project: reflection on specific situations of interaction with patients in the form of oral/written narratives and the development of video presentations in combination with 'reflective teams'. The study showed that to facilitate change in the role of staff members, it is important to combine several reflection arenas where theoretical principles can be converted into practical action. By drawing data from only one study site, the study has a limited transferability, but should be of interest for professionals working with clinical change processes.

  12. Report: EPA Has Implemented Corrective Actions to Improve Conditions at Asheville, North Carolina Superfund Site

    EPA Pesticide Factsheets

    Report #12-P-0362, March 21, 2012. Region 4 took actions to implement all recommendations made in EPA OIG Report No. 10-P-0130, EPA Activities Provide Limited Assurance of the Extent of Contamination and Risk at a North Carolina Hazardous Waste Site.

  13. In Vivo Measurement in Pigs of Wash-In Kinetics of Xenon at its Site of Action.

    PubMed

    Froeba, Gebhard; Adolph, Oliver

    2016-01-01

    Xenon (Xe) in many respects is an ideal anaesthetic agent. Its blood/gas partition coefficient is lower than that of any other anaesthetic, enabling rapid induction of and emergence from anaesthesia. While the whole body kinetics during wash-in of inhalational anaesthesia is well known, data describing the pharmacokinetics of xenon in the cerebral compartment at the site of action are still largely missing. In order to illuminate xenon's cerebral pharmacokinetics, we anaesthetised five pigs and measured arterial, mixed- and sagittal sinus-venous blood, as well as end-expiratory gas concentrations of xenon by gas chromatography-mass spectrometry (GCMS) up to 30 minutes after starting the anaesthetic gas mixture. Despite xenon's fast onset of effect the half-time for equilibration between xenon concentration in arterial blood and at the site of action is measured to be 1.49 ± 0.04 minutes versus 3.91 ± 0.1 minutes. Successful loading of xenon in the brain during inhalational anesthesia was accomplished after approximately 15 minutes although the end-expiratory xenon concentration reached a plateau after 7 minutes. Thus cerebral xenon uptake rate is only moderate, xenon fast onset of action being largely due to its extremely fast alveolar uptake. To ensure safety and precise control during anaesthesia we need a profound knowledge about to what extent the measured end-tidal concentrations reflect the drug concentrations in the target tissue. The results of this study expand our knowledge about the temporal characteristics of xenon´s pharmacokinetics at its site of action and provide the basis for appropriate clinical protocols and experimental designs of future studies.

  14. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and

  15. Chicana Feminist Strategies in a Participatory Action Research Project with Transnational Latina Youth

    ERIC Educational Resources Information Center

    Sanchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this…

  16. Preschool Work against Bullying and Degrading Treatment: Experiences from an Action Learning Project

    ERIC Educational Resources Information Center

    Söderström, Åsa; Löfdahl Hultman, Annica

    2017-01-01

    This article deals with experiences from an action learning project against bullying and degrading treatment among nine Swedish preschools. Even though definitions of bullying and degrading treatment tend to lead to thoughts of school-age children rather than preschoolers, previous research shows that bullying occurs in preschool as well. Our data…

  17. The Evaluation of an Early Childhood Teacher Preparation Program: An Action Research Project

    ERIC Educational Resources Information Center

    Ragno, Kerry Sullivan

    2013-01-01

    The purpose of this dissertation was to evaluate the effectiveness of an Early Childhood Development Associate of Applied Science (AAS) degree program at one community college as part of an ongoing action research project. Prior to this dissertation study, external and internal barriers prevented the associate degree program stakeholders from…

  18. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site near Gunnison, Colorado. Final

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to theirmore » water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land.« less

  19. Closure Report for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. M. Fitzmaurice

    2001-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Actionmore » Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box

  20. No Further Action Decision Under CERCLA Study 43R Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    in accordance with the same. E Date RAC Environmental Coordinator m U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BYRý% Date Fort Devens Remedial...CERCLA STUDY AREA 43R HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...ACTION DECISION UNDER CERCLA STUDY AREA 43R HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS I * Prepared for: U.S. Army Environmental Center

  1. Engaging Students in a Simulated Collaborative Action Research Project: An Evaluation of a Participatory Approach to Learning

    ERIC Educational Resources Information Center

    Congdon, Graham John; Congdon, Shirley

    2011-01-01

    This article reports an action research project designed to develop and implement a new participatory learning and teaching approach to enable postgraduate healthcare students to develop skills and knowledge in preparation for undertaking an action research study within their practice setting. The learning and teaching approach was based upon the…

  2. Cooperative and Context-Based Learning on Eletrochemical Cells in Lower Secondary Chemistry: A Project of Participatory Action Research

    ERIC Educational Resources Information Center

    Markic, Silvija; Eilks, Ingo

    2006-01-01

    This paper discusses a project of Participatory Action Research (PAR) on lower secondary chemistry education. In this ongoing project, practicing teachers and university researchers in chemical education jointly carry out projects for developing and evaluating new lesson plans. The focus of the PAR group is to develop teaching/learning activities…

  3. Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performedmore » to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater

  4. A Handbook of the Job-Site English Project 1985-86.

    ERIC Educational Resources Information Center

    Acevedo, Sheila; Dovel, Frankie

    The Orange County Public Schools' Job Site English Project was initiated to provide employees of businesses and industries with work-related English for speakers of other languages. The program features individualized curricula that are developed after the curriculum writer visits the business/industry in need of services, analyzes the…

  5. The SKI repository performance assessment project Site-94

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andersson, J.; Dverstorp, B.; Sjoeblom, R.

    1995-12-01

    SITE-94 is a research project conducted as a performance assessment of a hypothetical repository for spent nuclear fuel, but with real pre-excavation data from a real site. The geosphere, the engineered barriers and the processes for radionuclide release and transport comprise an integrated interdependent system, which is described by an influence diagram (PID) that reflects how different Features, Events or Processes (FEPs) inside the system interact. Site evaluation is used to determine information of transport paths in the geosphere and to deliver information on geosphere interaction with the engineered barriers. A three-dimensional geological structure model of the site as wellmore » as alternative conceptual models consistent with the existing hydrological field data, have been analyzed. Groundwater chemistry is evaluated and a model, fairly consistent with the flow model, for the origin of the different waters has been developed. The geological structure model is also used for analyzing the mechanical stability of the site. Several phenomena of relevance for copper corrosion in a repository environment have been investigated. For Reference Case conditions and regardless of flow variability, output is dominated by I-129, which, for a single canister, may give rise to drinking water well doses in the order of 10{sup -6}Sv/yr. Finally, it appears that the procedures involved in the development of influence diagrams may be a promising tool for quality assurance of performance assessments.« less

  6. A standard lexicon for biodiversity conservation: unified classifications of threats and actions.

    PubMed

    Salafsky, Nick; Salzer, Daniel; Stattersfield, Alison J; Hilton-Taylor, Craig; Neugarten, Rachel; Butchart, Stuart H M; Collen, Ben; Cox, Neil; Master, Lawrence L; O'Connor, Sheila; Wilkie, David

    2008-08-01

    An essential foundation of any science is a standard lexicon. Any given conservation project can be described in terms of the biodiversity targets, direct threats, contributing factors at the project site, and the conservation actions that the project team is employing to change the situation. These common elements can be linked in a causal chain, which represents a theory of change about how the conservation actions are intended to bring about desired project outcomes. If project teams want to describe and share their work and learn from one another, they need a standard and precise lexicon to specifically describe each node along this chain. To date, there have been several independent efforts to develop standard classifications for the direct threats that affect biodiversity and the conservation actions required to counteract these threats. Recognizing that it is far more effective to have only one accepted global scheme, we merged these separate efforts into unified classifications of threats and actions, which we present here. Each classification is a hierarchical listing of terms and associated definitions. The classifications are comprehensive and exclusive at the upper levels of the hierarchy, expandable at the lower levels, and simple, consistent, and scalable at all levels. We tested these classifications by applying them post hoc to 1191 threatened bird species and 737 conservation projects. Almost all threats and actions could be assigned to the new classification systems, save for some cases lacking detailed information. Furthermore, the new classification systems provided an improved way of analyzing and comparing information across projects when compared with earlier systems. We believe that widespread adoption of these classifications will help practitioners more systematically identify threats and appropriate actions, managers to more efficiently set priorities and allocate resources, and most important, facilitate cross-project learning and the

  7. 75 FR 59078 - Safety Zone; Ledge Removal Project, Bass Harbor, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2010-0806] RIN 1625-AA00 Safety Zone; Ledge Removal Project, Bass Harbor, ME AGENCY: Coast Guard, DHS. ACTION: Temporary... District USACE Web site: http://www.nae.usace.army.mil/projects/me/bassharbor/bassharbor.htm . No...

  8. Developing effective assignment feedback for an interprofessional learning module-An action research project.

    PubMed

    Strudwick, Ruth; Day, Jane

    2015-09-01

    The first year interprofessional learning module at University Campus Suffolk (UCS) is delivered to 300 students and the students' assignments are marked by 20 members of staff from different health and social care professions. We were keen to find a way to reduce any inconsistencies and work with both staff and students to ensure that the essay and subsequent feedback were useful for all involved. The aims of the project were to evaluate the current marking process and feedback sheets used for year one inter-professional learning (IPL) marking, and to develop an appropriate marking tool and feedback sheet that would enable markers to provide more consistent feedback to the students. Participatory action research was used with both students and staff members being involved. Focus group and questions were used to ascertain views about the assignment feedback. The feedback from this action learning project helped us to enhance the feedback for students. There was also an increase in engagement with the assessment and feedback process amongst both staff and students. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. Closure Report for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss and Catherine Birney

    2011-05-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 544 are located within Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada National Security Site. Corrective Action Unit 544 comprises the following CASs: • 02-37-08,more » Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for CASs within CAU 544 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 544 issued by the Nevada Division of Environmental Protection.« less

  10. Anesthetic sites and allosteric mechanisms of action on Cys-loop ligand-gated ion channels.

    PubMed

    Forman, Stuart A; Miller, Keith W

    2011-02-01

    The Cys-loop ligand-gated ion channel superfamily is a major group of neurotransmitter-activated receptors in the central and peripheral nervous system. The superfamily includes inhibitory receptors stimulated by γ-aminobutyric acid (GABA) and glycine and excitatory receptors stimulated by acetylcholine and serotonin. The first part of this review presents current evidence on the location of the anesthetic binding sites on these channels and the mechanism by which binding to these sites alters their function. The second part of the review addresses the basis for this selectivity, and the third part describes the predictive power of a quantitative allosteric model showing the actions of etomidate on γ-aminobutyric acid type A receptors (GABA(A)Rs). General anesthetics at clinical concentrations inhibit the excitatory receptors and enhance the inhibitory receptors. The location of general anesthetic binding sites on these receptors is being defined by photoactivable analogues of general anesthetics. The receptor studied most extensively is the muscle-type nicotinic acetylcholine receptor (nAChR), and progress is now being made with GABA(A)Rs. There are three categories of sites that are all in the transmembrane domain: 1) within a single subunit's four-helix bundle (intrasubunit site; halothane and etomidate on the δ subunit of AChRs); 2) between five subunits in the transmembrane conduction pore (channel lumen sites; etomidate and alcohols on nAChR); and 3) between two subunits (subunit interface sites; etomidate between the α1 and β2/3 subunits of the GABA(A)R). These binding sites function allosterically. Certain conformations of a receptor bind the anesthetic with greater affinity than others. Time-resolved photolabelling of some sites occurs within milliseconds of channel opening on the nAChR but not before. In GABA(A)Rs, electrophysiological data fit an allosteric model in which etomidate binds to and stabilizes the open state, increasing both the fraction

  11. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings,more » and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.« less

  12. The Early Childhood Education of Aboriginal Australians: A Review of Six Action-Research Projects.

    ERIC Educational Resources Information Center

    Teasdale, G. R.; Whitelaw, A. J.

    The book describes the setting, objectives, program, evaluation and achievement of six innovative action-research early childhood education projects for Aboriginal Australian children, traces various previous attempts to provide education, and provides an historical background of the estimated 140,000 Aboriginal people who make up 1% of…

  13. The Action--Reflection--Modelling (ARM) Pedagogical Approach for Teacher Education: A Malaysia-UK Project

    ERIC Educational Resources Information Center

    Jarvis, Joy; Dickerson, Claire; Thomas, Kit; Graham, Sally

    2014-01-01

    This article presents the Action--Reflection--Modelling (ARM) pedagogical approach for teacher education developed during a Malaysia-UK collaborative project to construct a Bachelor of Education (Honours) degree programme in Primary Mathematics, with English and Health and Physical Education as minor subjects. The degree programme was written…

  14. Site-specific surveillance project at the Koppers Company, Inc. , National Priorities List Site, Texarkana, Texas. Final report, March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    A site-specific surveillance project was conducted at the Koppers Company, a National Priorities List site. The findings indicated that living in the Koppers area was associated with a higher prevalance of reported rashes than among residents of a similar neighborhood in Texarkana not located near this site. Koppers residents did not appear to have higher rates of either adverse pregnancy outcomes or cancer than comparison residents. They did have many more concerns about their soil, water, and chemical odors in their neighborhood than did residents of the comparison neighborhood.

  15. Preliminary results of BRAVO project: brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks.

    PubMed

    Bergamasco, Massimo; Frisoli, Antonio; Fontana, Marco; Loconsole, Claudio; Leonardis, Daniele; Troncossi, Marco; Foumashi, Mohammad Mozaffari; Parenti-Castelli, Vincenzo

    2011-01-01

    This paper presents the preliminary results of the project BRAVO (Brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks). The objective of this project is to define a new approach to the development of assistive and rehabilitative robots for motor impaired users to perform complex visuomotor tasks that require a sequence of reaches, grasps and manipulations of objects. BRAVO aims at developing new robotic interfaces and HW/SW architectures for rehabilitation and regain/restoration of motor function in patients with upper limb sensorimotor impairment through extensive rehabilitation therapy and active assistance in the execution of Activities of Daily Living. The final system developed within this project will include a robotic arm exoskeleton and a hand orthosis that will be integrated together for providing force assistance. The main novelty that BRAVO introduces is the control of the robotic assistive device through the active prediction of intention/action. The system will actually integrate the information about the movement carried out by the user with a prediction of the performed action through an interpretation of current gaze of the user (measured through eye-tracking), brain activation (measured through BCI) and force sensor measurements. © 2011 IEEE

  16. No Further Action Decision Under CERCLA, Study Area 43B, Historic Gas Station Sites, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    I U.S. Army EnvironmentalCenter NO FURTHER ACTION DECISION UNDER CERCLA * STUDY AREA 43B HISTORIC GAS STATION SITES U FORT DEVENS , MASSACHUSETTS I I... FORT DEVENS , MASSACHUSETTS I I i * Prepared for: U.S. Army Environmental Center Aberdeen Proving Ground, Maryland Contract DAAA15-91-0008 I Prepared...HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS TABLE OF CONTENTS Section Title Page No. EXECUTIVE SUMMARY

  17. Conscious Engagement in Undergraduate Male Nursing Students: Facilitating Voice through an Action Research Project

    ERIC Educational Resources Information Center

    Maykut, Colleen A.; Lee, Andrew; Argueta, Nelson Garcia; Grant, Sean; Miller, Cole

    2016-01-01

    Although women have made significant progress into traditionally male-dominated professions, such as medicine and engineering, the same cannot be said of men in the nursing profession. Utilizing a critical social theory perspective, an action research project was designed to encourage participants, current male nursing students and alumni of…

  18. "Who Did What?": A Participatory Action Research Project to Increase Group Capacity for Advocacy

    ERIC Educational Resources Information Center

    Garcia-Iriarte, E.; Kramer, J. C.; Kramer, J. M.; Hammel, J.

    2009-01-01

    Background: This participatory action research (PAR) project involved a collaboration with a self-advocacy group of people with intellectual disabilities that sought to build group capacity for advocacy. Materials and Methods: This study used a focus group, sustained participatory engagement and a reflexive process to gather qualitative and…

  19. Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal

  20. Civic Action Projects Report, 1 January 1965-31 December 1965. Volume 1

    DTIC Science & Technology

    1966-06-22

    1400 kilometers of federal highway along the fringes of the Amazon jungle to the border of Brazil and Peru which will provide communications between... Peru Uruguay j ^^ Venezuela MARQUAT MEMORIAL UBRAEY U^. ARMY CIVIL AFFAIBS SCHOOL FOBX GQfiDOM, GA. f US30UTHCOM 1965 CIVIC ACTION PROJECTS...movie has been excellent. The film was also shown at the Conference of American Armies in Lima, Peru in November 1965. The military units are

  1. No Further Action Decision Under CERCLA Study Area 43K Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    with the same. AMES C. CHAMBERS Date RAC Environmental Coordinator U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BYRNE Date Fort Devens l(emedial...STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND, MARYLAND JANUARY 1995 PRINTED ON...Distribution Unlimited U.S. ArmyEnvironmentalCenter NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43K HISTORIC GAS STATION SITES FORT DEVENS ,9

  2. Teacher Action Research Teams: Building Collaborative Structures for Schools: A Report from the Schools Reaching Out Project.

    ERIC Educational Resources Information Center

    Krasnow, Jean H.

    A teacher action research study, undertaken as part of the larger Schools Reaching Out (SRO) project, sponsored by the Institute for Responsive Education, is described in this report. The project is based on the concept of the urban school, family, and community partnership as a means to improve all children's academic achievement and social…

  3. Site-specific PEGylation of human thyroid stimulating hormone to prolong duration of action.

    PubMed

    Qiu, Huawei; Boudanova, Ekaterina; Park, Anna; Bird, Julie J; Honey, Denise M; Zarazinski, Christine; Greene, Ben; Kingsbury, Jonathan S; Boucher, Susan; Pollock, Julie; McPherson, John M; Pan, Clark Q

    2013-03-20

    Recombinant human thyroid stimulating hormone (rhTSH or Thyrogen) has been approved for thyroid cancer diagnostics and treatment under a multidose regimen due to its short circulating half-life. To reduce dosing frequency, PEGylation strategies were explored to increase the duration of action of rhTSH. Lysine and N-terminal PEGylation resulted in heterogeneous product profiles with 40% or lower reaction yields of monoPEGylated products. Eleven cysteine mutants were designed based on a structure model of the TSH-TSH receptor (TSHR) complex to create unique conjugation sites on both α and β subunits for site-specific conjugation. Sequential screening of mutant expression level, oligomerization tendency, and conjugation efficiency resulted in the identification of the αG22C rhTSH mutant for stable expression and scale-up PEGylation. The introduced cysteine in the αG22C rhTSH mutant was partially blocked when isolated from conditioned media and could only be effectively PEGylated after mild reduction with cysteine. This produced a higher reaction yield, ~85%, for the monoPEGylated product. Although the mutation had no effect on receptor binding, PEGylation of αG22C rhTSH led to a PEG size-dependent decrease in receptor binding. Nevertheless, the 40 kDa PEG αG22C rhTSH showed a prolonged duration of action compared to rhTSH in a rat pharmacodynamics model. Reverse-phase HPLC and N-terminal sequencing experiments confirmed site-specific modification at the engineered Cys 22 position on the α-subunit. This work is another demonstration of successful PEGylation of a cysteine-knot protein by an engineered cysteine mutation.

  4. PHYSICAL SOLUTIONS FOR ACID ROCK DRAINAGE AT REMOTE SITES DEMONSTRATION PROJECT

    EPA Science Inventory

    This report summarizes the results of Mine Waste Technology Program, Activity III, Project 42, Physical Solutions for Acid Rock Drainage at Remote Sites, funded by the U.S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U.S. Department of Energy. A...

  5. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Administration (FHWA), Department of Transportation (DOT). ACTION: Notice of limitations on claims for judicial... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...

  6. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less

  7. Superfund Record of Decision (EPA Region 5): Bofors Nobel Site, Muskegon, MI. (First remedial action), (amendment), July 1992. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 85-acre Bofors Nobel site contains an active specialty chemical production plant in Egelston Township, Muskegon County, Michigan. Site features include an unused landfill. The ROD amends a 1990 ROD written by the state, which consisted of onsite incineration and onsite landfilling of lagoon area soil, construction of RCRA-type secure landfill cells to hold non-incinerated material and ash from the incinerated sludge. The selected amended remedial action for the site includes excavating and containing approximately 767,000 cubic yards of untreated sludge and soil in onsite RCRA-type secure landfill cells constructed as part of the original remedial action. The ROD Amendmentmore » does not address any issue associated with ground water treatment.« less

  8. "A Guided Walk in the Woods": Boundary Crossing in a Collaborative Action Research Project

    ERIC Educational Resources Information Center

    Jacobs, Gaby

    2017-01-01

    This article discusses the ideal and practice of collaboration in a collaborative action research project in which university researchers work together with staff from the field of primary education. A qualitative case study was conducted using the theory of boundary crossing to make sense of the ways collaboration took place within the project…

  9. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in themore » final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  10. Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-08-01

    Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according tomore » the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and

  11. Towards canine rabies elimination: Economic comparisons of three project sites.

    PubMed

    Elser, J L; Hatch, B G; Taylor, L H; Nel, L H; Shwiff, S A

    2018-02-01

    An appreciation of the costs of implementing canine rabies control in different settings is important for those planning new or expanded interventions. Here we compare the costs of three canine rabies control projects in South Africa, the Philippines and Tanzania to identify factors that influence the overall costs of rabies control efforts. There was considerable variation in the cost of vaccinating each dog, but across the sites these were lower where population density was higher, and later in the projects when dog vaccination coverage was increased. Transportation costs comprised a much higher proportion of total costs in rural areas and where house-to-house vaccination campaigns were necessary. The association between the cost of providing PEP and human population density was less clear. The presence of a pre-existing national rabies management programme had a marked effect on keeping infrastructure and equipment costs for the project low. Finally, the proportion of the total costs of the project provided by the external donor was found to be low for the projects in the Philippines and South Africa, but likely covered close to the complete costs of the project in Tanzania. The detailed economic evaluation of three recent large-scale rabies control pilot projects provides the opportunity to examine economic costs across these different settings and to identify factors influencing rabies control costs that could be applied to future projects. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  12. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... licenses, permits, and approvals for the highway and transit project. Tier 1 decisions also may be relied... Administrator, Federal Highway Administration, 3250 Executive Park Drive, Springfield, Illinois 62703, Phone... eliminated from further consideration and study, including but not limited to, the No-Action Alternative...

  13. The Disposability of Baltimore's Black Communities: A Participatory Action Research Project on the Impact of School Closings

    ERIC Educational Resources Information Center

    Shiller, Jessica

    2018-01-01

    This article presents the results of a participatory action research project about the impact of the closings on the parents, teachers, and students experiencing school closure. Using participatory action research methods, the researcher, the author of this article, and a community-based organization worked together in "contingent…

  14. American Lead Action Memorandum

    EPA Pesticide Factsheets

    ACTION MEMORANDUM— Request for a Time-Critical Removal Action andExemption from the $2 Million and 12-Month Statutory Limits at the AmericanLead Site, Indianapolis, Marion County, Indiana (Site ID #B56J)

  15. Spatial dynamics of action potentials estimated by dendritic Ca(2+) signals in insect projection neurons.

    PubMed

    Ogawa, Hiroto; Mitani, Ruriko

    2015-11-13

    The spatial dynamics of action potentials, including their propagation and the location of spike initiation zone (SIZ), are crucial for the computation of a single neuron. Compared with mammalian central neurons, the spike dynamics of invertebrate neurons remain relatively unknown. Thus, we examined the spike dynamics based on single spike-induced Ca(2+) signals in the dendrites of cricket mechanosensory projection neurons, known as giant interneurons (GIs). The Ca(2+) transients induced by a synaptically evoked single spike were larger than those induced by an antidromic spike, whereas subthreshold synaptic potentials caused no elevation of Ca(2+). These results indicate that synaptic activity enhances the dendritic Ca(2+) influx through voltage-gated Ca(2+) channels. Stimulation of the presynaptic sensory afferents ipsilateral to the recording site evoked a dendritic spike with higher amplitude than contralateral stimulation, thereby suggesting that alteration of the spike waveform resulted in synaptic enhancement of the dendritic Ca(2+) transients. The SIZ estimated from the spatial distribution of the difference in the Ca(2+) amplitude was distributed throughout the right and left dendritic branches across the primary neurite connecting them in GIs. Copyright © 2015 Elsevier Inc. All rights reserved.

  16. Project M: Scale Model of Lunar Landing Site of Apollo 17: Focus on Lighting Conditions and Analysis

    NASA Technical Reports Server (NTRS)

    Vanik, Christopher S.; Crain, Timothy P.

    2010-01-01

    This document captures the research and development of a scale model representation of the Apollo 17 landing site on the moon as part of the NASA INSPIRE program. Several key elements in this model were surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. This model supports development of Autonomous Landing and Hazard Avoidance Technology (ALHAT) and Project M for the GN&C Autonomous Flight Systems Branch. It will help project engineers visualize the landing site, and is housed in the building 16 Navigation Systems Technology Lab. The lead mentor was Dr. Timothy P. Crain. The purpose of this project was to develop an accurate scale representation of the Apollo 17 landing site on the moon. This was done on an 8'2.5"X10'1.375" reduced friction granite table, which can be restored to its previous condition if needed. The first step in this project was to research the best way to model and recreate the Apollo 17 landing site for the mockup. The project required a thorough plan, budget, and schedule, which was presented to the EG6 Branch for build approval. The final phase was to build the model. The project also required thorough research on the Apollo 17 landing site and the topography of the moon. This research was done on the internet and in person with Dean Eppler, a space scientist, from JSC KX. This data was used to analyze and calculate the scale of the mockup and the ratio of the sizes of the craters, ridges, etc. The final goal was to effectively communicate project status and demonstrate the multiple advantages of using our model. The conclusion of this project was that the mockup was completed as accurately as possible, and it successfully enables the Project M specialists to visualize and plan their goal on an accurate three dimensional surface representation.

  17. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less

  18. Proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural

  19. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less

  20. Chicana feminist strategies in a participatory action research project with transnational Latina youth.

    PubMed

    Sánchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this knowledge as conocimientos, or "homemade theory." The author discusses the project, the collaborative writing of a children's book based on two years of data collection, the challenges in being both an insider and an outsider to the community, how the youth created a counterstory based on their transnational immigrant lifestyle, and how an out-of-school setting promoted engaged research with urban teens.

  1. Teaching Inquiry to High School Teachers through the Use of Mathematics Action Research Projects

    ERIC Educational Resources Information Center

    Miller, Nathaniel

    2017-01-01

    This paper describes the use of Mathematics Action Research Projects (ARPs) as a capstone experience in lieu of a Master's Thesis in a Master's program for in-service secondary teachers. The ARPs include two primary components: (i) each teacher participant conducts mathematical research that is new to them on a topic that is connected in some way…

  2. No Further Action Decision Under CERCLA Study Area 43Q Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    the same. ,J ES C. CHAMBERS Date RAC Environmental Coordinator I U.S. ENVIRONMENTAL PROTECTION AGENCY -t JAMES P. BYR4 Date3 Fort Devens Refiedial...CERCLA STUDY AREA 43Q HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS , CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...ACTION DECISION UNDER CERCLA STUDY AREA 43Q HISTORIC GAS STATION SITES 5 FORT DEVENS , MASSACHUSETTS V a I i Prepared for: U.S. Army Environmental Center

  3. Exploring teachers' beliefs and knowledge about scientific inquiry and the nature of science: A collaborative action research project

    NASA Astrophysics Data System (ADS)

    Fazio, Xavier Eric

    Science curriculum reform goals espouse the need to foster and support the development of scientific literacy in students. Two critical goals of scientific literacy are students' engagement in, and developing more realistic conceptions about scientific inquiry (SI) and the nature of science (NOS). In order to promote the learning of these curriculum emphases, teachers themselves must possess beliefs and knowledge supportive of them. Collaborative action research is a viable form of curriculum and teacher development that can be used to support teachers in developing the requisite beliefs and knowledge that can promote these scientific literacy goals. This research study used a collective case study methodology to describe and interpret the views and actions of four teachers participating in a collaborative action research project. I explored the teachers' SI and NOS views throughout the project as they investigated ideas and theories, critically examined their current curricular practice, and implemented and reflected on these modified curricular practices. By the end of the research study, all participants had uniquely augmented their understanding of SI and NOS. The participants were better able to provide explanatory depth to some SI and NOS ideas; however, specific belief revision with respect to SI and NOS ideas was nominal. Furthermore, their idealized action research plans were not implemented to the extent that they were planned. Explanations for these findings include: impact of significant past educational experiences, prior understanding of SI and NOS, depth of content and pedagogical content knowledge of the discipline, and institutional and instructional constraints. Nonetheless, through participation in the collaborative action research process, the teachers developed professionally, personally, and socially. They identified many positive outcomes from participating in a collaborative action research project; however, they espoused constraints to

  4. 75 FR 44053 - Proposed Collection; Comment Request: CDFI/CDE Project Profiles Web Form

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ...; Comment Request: CDFI/CDE Project Profiles Web Form ACTION: Notice and request for comments. SUMMARY: The... the Treasury, is soliciting comments concerning the CDFI/CDE Project Profile Web Form, a voluntary... CIIS. The CDFI Fund plans to use the descriptions in CDFI Fund publications, on its Web site and in...

  5. Action learning across the decades.

    PubMed

    Eason, Ken

    2017-05-02

    Purpose The purpose of this paper is to explore how action learning concepts were used in two healthcare projects undertaken many decades apart. The specific purpose in both cases was to examine how action learning can contribute to shared learning across key stakeholders in a complex socio-technical system. In each case study, action learning supported joint design programmes and the sharing of perspectives about the complex system under investigation. Design/methodology/approach Two action learning projects are described: first, the Hospital Internal Communications (HIC) project led by Reg Revans in the 1960s. Senior staff in ten London hospitals formed action learning teams to address communication issues. Second, in the Better Outcomes for People with Learning Disabilities: Transforming Care (BOLDTC) project, videoconferencing equipment enabled people with learning disabilities to increase their opportunities to communicate. A mutual learning process was established to enable stakeholders to explore the potential of the technical system to improve individual care. Findings The HIC project demonstrated the importance of evidence being shared between team members and that action had to engage the larger healthcare system outside the hospital. The BOLDTC project confirmed the continuing relevance of action learning to healthcare today. Mutual learning was achieved between health and social care specialists and technologists. Originality/value This work draws together the socio-technical systems tradition (considering both social and technical issues in organisations) and action learning to demonstrate that complex systems development needs to be undertaken as a learning process in which action provides the fuel for learning and design.

  6. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  7. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less

  8. Superfund Record of Decision (EPA Region 6): Koppers Texarkana Site, Texarkana, Texas (first remedial action), September 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Koppers Texarkana site is located within the City of Texarkana, Texas. The site consists of a 34-acre residential area and a 28-acre former sand and gravel operation. The Koppers Company operated the site as a wood-preserving facility from 1910 to 1961 using pentachlorophenol (PCP), creosote, and metallic salts in the operation. The site is currently owned by Carver Terrace, Inc. The Texas Department of Water Resources became aware of the site in 1979 through the Ekhardt Survey. The remedial investigation indicated that the highest concentration of site contaminants in the soil were located near the operations and drip trackmore » areas of the old wood-preserving facility. The primary contaminants of concern affecting the soil, ground water, and sediments are volatile organic compounds including benzene, xylenes, and toluene, other organics including polynuclear aromatic hydrocarbons and PCP, and metals including arsenic. The selected remedial action for the site is included.« less

  9. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pat Matthews

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less

  10. Stereoscopically Observing Manipulative Actions

    PubMed Central

    Ferri, S.; Pauwels, K.; Rizzolatti, G.; Orban, G. A.

    2016-01-01

    The purpose of this study was to investigate the contribution of stereopsis to the processing of observed manipulative actions. To this end, we first combined the factors “stimulus type” (action, static control, and dynamic control), “stereopsis” (present, absent) and “viewpoint” (frontal, lateral) into a single design. Four sites in premotor, retro-insular (2) and parietal cortex operated specifically when actions were viewed stereoscopically and frontally. A second experiment clarified that the stereo-action-specific regions were driven by actions moving out of the frontoparallel plane, an effect amplified by frontal viewing in premotor cortex. Analysis of single voxels and their discriminatory power showed that the representation of action in the stereo-action-specific areas was more accurate when stereopsis was active. Further analyses showed that the 4 stereo-action-specific sites form a closed network converging onto the premotor node, which connects to parietal and occipitotemporal regions outside the network. Several of the specific sites are known to process vestibular signals, suggesting that the network combines observed actions in peripersonal space with gravitational signals. These findings have wider implications for the function of premotor cortex and the role of stereopsis in human behavior. PMID:27252350

  11. Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehleke, R. F.

    2014-05-06

    This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, andmore » 528.« less

  12. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclearmore » Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.« less

  13. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  14. Cornell University remote sensing program. [application to waste disposal site selection, study of drainage patterns, and water quality management.

    NASA Technical Reports Server (NTRS)

    Liang, T.; Mcnair, A. J.; Philipson, W. R.

    1977-01-01

    Aircraft and satellite remote sensing technology were applied in the following areas: (1) evaluation of proposed fly ash disposal sites; (2) development of priorities for drainage improvements; (3) state park analysis for rehabilitation and development; (4) watershed study for water quality planning; and (5) assistance project-landfill site selection. Results are briefly summarized. Other projects conducted include: (1) assessment of vineyard-related problems; (2) LANDSAT analysis for pheasant range management; (3) photo-historic evaluation of Revolutionary War sites; and (4) thermal analysis of building insulation. The objectives, expected benefits and actions, and status of these projects are described.

  15. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastesmore » still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).« less

  16. Childhood Obesity Research Demonstration Project: Cross-Site Evaluation Methods

    PubMed Central

    Lee, Rebecca E.; Mehta, Paras; Thompson, Debbe; Bhargava, Alok; Carlson, Coleen; Kao, Dennis; Layne, Charles S.; Ledoux, Tracey; O'Connor, Teresia; Rifai, Hanadi; Gulley, Lauren; Hallett, Allen M.; Kudia, Ousswa; Joseph, Sitara; Modelska, Maria; Ortega, Dana; Parker, Nathan; Stevens, Andria

    2015-01-01

    Abstract Introduction: The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which the CORD model is associated with changes in behavior, body weight, BMI, quality of life, and healthcare satisfaction in children 2–12 years of age. Design/Methods: The CORD Evaluation Center (EC-CORD) will analyze the pooled data from three independent demonstration projects that each integrate public health and primary care childhood obesity interventions. An extensive set of common measures at the family, facility, and community levels were defined by consensus among the CORD projects and EC-CORD. Process evaluation will assess reach, dose delivered, and fidelity of intervention components. Impact evaluation will use a mixed linear models approach to account for heterogeneity among project-site populations and interventions. Sustainability evaluation will assess the potential for replicability, continuation of benefits beyond the funding period, institutionalization of the intervention activities, and community capacity to support ongoing program delivery. Finally, cost analyses will assess how much benefit can potentially be gained per dollar invested in programs based on the CORD model. Conclusions: The keys to combining and analyzing data across multiple projects include the CORD model framework and common measures for the behavioral and health outcomes along with important covariates at the individual, setting, and community levels. The overall objective of the comprehensive evaluation will develop evidence-based recommendations for replicating and disseminating community-wide, integrated public health and primary care programs based on the CORD model. PMID:25679060

  17. 77 FR 3460 - Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-24

    ... Processing Sites AGENCY: Department of Energy. ACTION: Notice of the acceptance of Title X claims during... under Title X of the Energy Policy Act of 1992. In FY 2009, Congress appropriated $70 million for Title X in the American Recovery and Reinvestment Act of 2009 (Recovery Act). Also in FY 2009, Congress...

  18. Closure Letter Report for Corrective Action Unit 496: Buried Rocket Site - Antelope Lake

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    A Streamlined Approach for Environmental Restoration (SAFER) Plan for investigation and closure of CAU 496, Corrective Action Site (CAS) TA-55-008-TAAL (Buried Rocket), at the Tonopah Test Range (TTR), was approved by the Nevada Department of Environmental Protection (NDEP) on July 21,2004. Approval to transfer CAS TA-55-008-TAAL from CAU 496 to CAU 4000 (No Further Action Sites) was approved by NDEP on December 21, 2005, based on the assumption that the rocket did not present any environmental concern. The approval letter included the following condition: ''NDEP understands, from the NNSA/NSO letter dated November 30,2005, that a search will be conducted formore » the rocket during the planned characterization of other sites at the Tonopah Test Range and, if found, the rocket will be removed as a housekeeping measure''. NDEP and U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office personnel located the rocket on Mid Lake during a site visit to TTR, and a request to transfer CAS TA-55-008-TAAL from CAU 4000 back to CAU 496 was approved by NDEP on September 11,2006. CAS TA-55-008-TAAL was added to the ''Federal Facility Agreement and Consent Order'' of 1996, based on an interview with a retired TTR worker in 1993. The original interview documented that a rocket was launched from Area 9 to Antelope Lake and was never recovered due to the high frequency of rocket tests being conducted during this timeframe. The interviewee recalled the rocket being an M-55 or N-55 (the M-50 ''Honest John'' rocket was used extensively at TTR from the 1960s to early 1980s). A review of previously conducted interviews with former TTR personnel indicated that the interviewees confused information from several sites. The location of the CAU 496 rocket on Mid Lake is directly south of the TTR rocket launch facility in Area 9 and is consistent with information gathered on the lost rocket during recent interviews. Most pertinently, an interview in 2005 with

  19. Trends in drinking-driving at night : a comparison of the four roadside surveys of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1975-01-01

    As part of the Fairfax Alcohol Safety Action Project (ASAP), staff members of the Virginia. Highway and Transportation Research Council, acting in their role as evaluators of the project, have conducted four nighttime roadside surveys in Fairfax, Vir...

  20. Wildlife mitigation and monitoring report Gunnison, Colorado, site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapramore » americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.« less

  1. A new herbicidal site of action: Cinmethylin binds to acyl-ACP thioesterase and inhibits plant fatty acid biosynthesis.

    PubMed

    Campe, Ruth; Hollenbach, Eva; Kämmerer, Lara; Hendriks, Janneke; Höffken, Hans Wolfgang; Kraus, Helmut; Lerchl, Jens; Mietzner, Thomas; Tresch, Stefan; Witschel, Matthias; Hutzler, Johannes

    2018-06-01

    The prevalent occurrence of herbicide resistant weeds increases the necessity for new site of action herbicides for effective control as well as to relax selection pressure on the known sites of action. As a consequence, interest increased in the unexploited molecule cinmethylin as a new solution for the control of weedy grasses in cereals. Therefore, the mechanism of action of cinmethylin was reevaluated. We applied the chemoproteomic approach cellular Target Profiling™ from Evotec to identify the cinmethylin target in Lemna paucicostata protein extracts. We found three potential targets belonging to the same protein family of fatty acid thioesterases (FAT) to bind to cinmethylin with high affinity. Binding of cinmethylin to FAT proteins from Lemna and Arabidopsis was confirmed by fluorescence-based thermal shift assay. The plastid localized enzyme FAT plays a crucial role in plant lipid biosynthesis, by mediating the release of fatty acids (FA) from its acyl carrier protein (ACP) which is necessary for FA export to the endoplasmic reticulum. GC-MS analysis of free FA composition in Lemna extracts revealed strong reduction of unsaturated C18 as well as saturated C14, and C16 FAs upon treatment with cinmethylin, indicating that FA release for subsequent lipid biosynthesis is the primary target of cinmethylin. Lipid biosynthesis is a prominent target of different herbicide classes. To assess whether FAT inhibition constitutes a new mechanism of action within this complex pathway, we compared physiological effects of cinmethylin to different ACCase and VLCFA synthesis inhibitors and identified characteristic differences in plant symptomology and free FA composition upon treatment with the three herbicide classes. Also, principal component analysis of total metabolic profiling of treated Lemna plants showed strong differences in overall metabolic changes after cinmethylin, ACCase or VLCFA inhibitor treatments. Our results identified and confirmed FAT as the

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  3. The Bonebrake Theological Seminary: Top-Secret Manhattan Project Site

    NASA Astrophysics Data System (ADS)

    Sopka, Katherine R.; Sopka, Elisabeth M.

    2010-09-01

    We discuss the top-secret Manhattan Project site established at the Bonebrake Theological Seminary in 1943 in Dayton, Ohio, where research on polonium and its production was carried out. The polonium produced there was then transported to Los Alamos to be used in a polonium-beryllium neutron source whose purpose was to ignite the plutonium implosion bomb that would be dropped on Nagasaki, Japan, on August 9, 1945. Our account is based primarily on the recollections of John J. Sopka, research physicist at the Bonebrake laboratory.

  4. A central site of action for benzamide facilitation of gastric emptying.

    PubMed

    Costall, B; Gunning, S J; Naylor, R J; Simpson, K H

    1983-07-22

    Gastric emptying of the fed guinea-pig was measured using a non-invasive X-ray fluoroscopic technique to determine passage from the stomach of polystyrene-coated barium sulphate spheroids. Peripherally administered metoclopramide (0.1-10 mg/kg i.p.), clebopride (1-10 mg/kg i.p.), (-)-sulpiride (40 mg/kg i.p.), haloperidol (1 mg/kg i.p.) and domperidone (1-10 mg/kg i.p.) failed to modify gastric emptying. Stress inhibited emptying, and this was considered to explain the effects of eserine and high dose metoclopramide. Gastric emptying was decreased by peripherally administered atropine (0.5 mg/kg i.p.) and apomorphine (0.1-0.5 mg/kg s.c.); the apomorphine response was antagonised by pretreatment with haloperidol, domperidone, (-)-sulpiride, metoclopramide and clebopride but not by prazosin + propranolol. Gastric emptying was facilitated by intracerebroventricular (i.c.v.) administrations of metoclopramide and clebopride (40, 100 and 200 micrograms) but not by i.c.v. domperidone, haloperidol, fluphenazine or (-)-sulpiride (100, 200 micrograms) and was inhibited by i.c.v. apomorphine (100, 200 micrograms); the response to i.c.v. apomorphine was antagonised by i.c.v. pretreatments with haloperidol, domperidone, (-)-sulpiride, metoclopramide and clebopride (40-50 micrograms). Facilitation of emptying by i.c.v. metoclopramide was prevented by peripheral pretreatment with atropine (0.5 mg/kg i.p.). It is concluded that the actions of apomorphine and metoclopramide/clebopride to respectively inhibit and facilitate gastric emptying may be mediated, at least in part, via central mechanisms. Whilst apomorphine's action may be mediated via dopamine receptor mechanisms, metoclopramide and clebopride act at additional unspecified sites, metoclopramide's action being expressed via cholinergic mechanisms.

  5. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    2006-09-01

    This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  6. An expert panel process to evaluate habitat restoration actions in the Columbia River estuary.

    PubMed

    Krueger, Kirk L; Bottom, Daniel L; Hood, W Gregory; Johnson, Gary E; Jones, Kim K; Thom, Ronald M

    2017-03-01

    We describe a process for evaluating proposed ecosystem restoration projects intended to improve survival of juvenile salmon in the Columbia River estuary (CRE). Changes in the Columbia River basin (northwestern USA), including hydropower development, have contributed to the listing of 13 salmon stocks as endangered or threatened under the U.S. Endangered Species Act. Habitat restoration in the CRE, from Bonneville Dam to the ocean, is part of a basin-wide, legally mandated effort to mitigate federal hydropower impacts on salmon survival. An Expert Regional Technical Group (ERTG) was established in 2009 to improve and implement a process for assessing and assigning "survival benefit units" (SBUs) to restoration actions. The SBU concept assumes site-specific restoration projects will increase juvenile salmon survival during migration through the 234 km CRE. Assigned SBUs are used to inform selection of restoration projects and gauge mitigation progress. The ERTG standardized the SBU assessment process to improve its scientific integrity, repeatability, and transparency. In lieu of experimental data to quantify the survival benefits of individual restoration actions, the ERTG adopted a conceptual model composed of three assessment criteria-certainty of success, fish opportunity improvements, and habitat capacity improvements-to evaluate restoration projects. Based on these criteria, an algorithm assigned SBUs by integrating potential fish density as an indicator of salmon performance. Between 2009 and 2014, the ERTG assessed SBUs for 55 proposed projects involving a total of 181 restoration actions located across 8 of 9 reaches of the CRE, largely relying on information provided in a project template based on the conceptual model, presentations, discussions with project sponsors, and site visits. Most projects restored tidal inundation to emergent wetlands, improved riparian function, and removed invasive vegetation. The scientific relationship of geomorphic and

  7. 75 FR 2138 - Interconnection of the Proposed Hermosa West Wind Farm Project, Wyoming (DOE/EIS-0438)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... SWE's proposed Project would consist of up to 200 wind turbine generators with a combined total... siting process for the wind turbine strings and associated facilities considered sensitive resources, and... West Wind Farm Project, Wyoming (DOE/EIS-0438) AGENCY: Western Area Power Administration, DOE. ACTION...

  8. Stereoscopically Observing Manipulative Actions.

    PubMed

    Ferri, S; Pauwels, K; Rizzolatti, G; Orban, G A

    2016-08-01

    The purpose of this study was to investigate the contribution of stereopsis to the processing of observed manipulative actions. To this end, we first combined the factors "stimulus type" (action, static control, and dynamic control), "stereopsis" (present, absent) and "viewpoint" (frontal, lateral) into a single design. Four sites in premotor, retro-insular (2) and parietal cortex operated specifically when actions were viewed stereoscopically and frontally. A second experiment clarified that the stereo-action-specific regions were driven by actions moving out of the frontoparallel plane, an effect amplified by frontal viewing in premotor cortex. Analysis of single voxels and their discriminatory power showed that the representation of action in the stereo-action-specific areas was more accurate when stereopsis was active. Further analyses showed that the 4 stereo-action-specific sites form a closed network converging onto the premotor node, which connects to parietal and occipitotemporal regions outside the network. Several of the specific sites are known to process vestibular signals, suggesting that the network combines observed actions in peripersonal space with gravitational signals. These findings have wider implications for the function of premotor cortex and the role of stereopsis in human behavior. © The Author 2016. Published by Oxford University Press.

  9. 76 FR 24871 - Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ... Processing Sites AGENCY: Department of Energy. ACTION: Notice of change in the acceptance of Title X claims... reimbursement under Title X of the Energy Policy Act of 1992. DATES: In our Federal Register Notice of November... Register on May 23, 1994, (59 FR 26714) to carry out the requirements of Title X of the Energy Policy Act...

  10. SITEX 2.0: Projections of protein functional sites on eukaryotic genes. Extension with orthologous genes.

    PubMed

    Medvedeva, Irina V; Demenkov, Pavel S; Ivanisenko, Vladimir A

    2017-04-01

    Functional sites define the diversity of protein functions and are the central object of research of the structural and functional organization of proteins. The mechanisms underlying protein functional sites emergence and their variability during evolution are distinguished by duplication, shuffling, insertion and deletion of the exons in genes. The study of the correlation between a site structure and exon structure serves as the basis for the in-depth understanding of sites organization. In this regard, the development of programming resources that allow the realization of the mutual projection of exon structure of genes and primary and tertiary structures of encoded proteins is still the actual problem. Previously, we developed the SitEx system that provides information about protein and gene sequences with mapped exon borders and protein functional sites amino acid positions. The database included information on proteins with known 3D structure. However, data with respect to orthologs was not available. Therefore, we added the projection of sites positions to the exon structures of orthologs in SitEx 2.0. We implemented a search through database using site conservation variability and site discontinuity through exon structure. Inclusion of the information on orthologs allowed to expand the possibilities of SitEx usage for solving problems regarding the analysis of the structural and functional organization of proteins. Database URL: http://www-bionet.sscc.ru/sitex/ .

  11. Archaeological Investigations at Site 45-DO-273, Chief Joseph Dam Project, Washington.

    DTIC Science & Technology

    1984-01-01

    CHOPPERS . .. ........................... 60 DRILLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 GRAVERS...6 Plate 3-1. Shaft abrader, hammerstones, netslnker, and chopper . . . . 50 Plate 3-2. Blfaces and scrapers .. .. .. .... ... .... . ... 58 Plate 3...sites as low as possible. * . The Project’s Investigations are documented In four report series. Reports describing archaeological reconnaissance and

  12. Crystallographic characterization of the ribosomal binding site and molecular mechanism of action of Hygromycin A

    PubMed Central

    Kaminishi, Tatsuya; Schedlbauer, Andreas; Fabbretti, Attilio; Brandi, Letizia; Ochoa-Lizarralde, Borja; He, Cheng-Guang; Milón, Pohl; Connell, Sean R.; Gualerzi, Claudio O.; Fucini, Paola

    2015-01-01

    Hygromycin A (HygA) binds to the large ribosomal subunit and inhibits its peptidyl transferase (PT) activity. The presented structural and biochemical data indicate that HygA does not interfere with the initial binding of aminoacyl-tRNA to the A site, but prevents its subsequent adjustment such that it fails to act as a substrate in the PT reaction. Structurally we demonstrate that HygA binds within the peptidyl transferase center (PTC) and induces a unique conformation. Specifically in its ribosomal binding site HygA would overlap and clash with aminoacyl-A76 ribose moiety and, therefore, its primary mode of action involves sterically restricting access of the incoming aminoacyl-tRNA to the PTC. PMID:26464437

  13. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 3, Groundwater hydrology report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites. According to the Uranium Mill Tailings Radiation Control Act of 1978, (UMTRCA) the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined this assessment shall include information on hydrogeologic site characterization. The water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards is presented in Attachment 4. Site characterization activities discussed in this section include:more » Characterization of the hydrogeologic environment; characterization of existing groundwater quality; definition of physical and chemical characteristics of the potential contaminant source; and description of local water resources.« less

  14. Acorn Production on the Missouri Ozark Forest Ecosystem Project Study Sites: Pre-treatment Data

    Treesearch

    Larry D. Vangilder

    1997-01-01

    In the pre-treatment phase of a study to determine if even- and uneven-aged forest management affects the production of acorns on the Missourt Forest Ecosystem Project (MOFEP) study sites, acorn production was measured on the nine study sites by randomly placing from 2 to 6 plots in each of four ecological land type (ELT) groupings (N=130 plots). A split-plot...

  15. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    ERIC Educational Resources Information Center

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  16. Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Surovchak, Scott; Daniel, Joe

    The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at themore » site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long

  17. DNAPL SITE EVALUATION - Project Summary

    EPA Science Inventory

    Dense nonaqueous-phase liquids (DNAPLs), especially chlorinated solvents, are among the most prevalent subsurface contaminants identified in ground-water supplies and at waste disposal sites. There are several site-characterization issues specific to DNAPL sites including (a) the...

  18. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosking, H.

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  19. Electrically evoked compound action potentials are different depending on the site of cochlear stimulation.

    PubMed

    van de Heyning, Paul; Arauz, Santiago L; Atlas, Marcus; Baumgartner, Wolf-Dieter; Caversaccio, Marco; Chester-Browne, Ronel; Estienne, Patricia; Gavilan, Javier; Godey, Benoit; Gstöttner, Wolfgang; Han, Demin; Hagen, Rudolph; Kompis, Martin; Kuzovkov, Vlad; Lassaletta, Luis; Lefevre, Franc; Li, Yongxin; Müller, Joachim; Parnes, Lorne; Kleine Punte, Andrea; Raine, Christopher; Rajan, Gunesh; Rivas, Adriana; Rivas, José Antonio; Royle, Nicola; Sprinzl, Georg; Stephan, Kurt; Walkowiak, Adam; Yanov, Yuri; Zimmermann, Kim; Zorowka, Patrick; Skarzynski, Henryk

    2016-11-01

    One of the many parameters that can affect cochlear implant (CI) users' performance is the site of presentation of electrical stimulation, from the CI, to the auditory nerve. Evoked compound action potential (ECAP) measurements are commonly used to verify nerve function by stimulating one electrode contact in the cochlea and recording the resulting action potentials on the other contacts of the electrode array. The present study aimed to determine if the ECAP amplitude differs between the apical, middle, and basal region of the cochlea, if double peak potentials were more likely in the apex than the basal region of the cochlea, and if there were differences in the ECAP threshold and recovery function across the cochlea. ECAP measurements were performed in the apical, middle, and basal region of the cochlea at fixed sites of stimulation with varying recording electrodes. One hundred and forty one adult subjects with severe to profound sensorineural hearing loss fitted with a Standard or FLEX SOFT electrode were included in this study. ECAP responses were captured using MAESTRO System Software (MED-EL). The ECAP amplitude, threshold, and slope were determined using amplitude growth sequences. The 50% recovery rate was assessed using independent single sequences that have two stimulation pulses (a masker and a probe pulse) separated by a variable inter-pulse interval. For all recordings, ECAP peaks were annotated semi-automatically. ECAP amplitudes were greater upon stimulation of the apical region compared to the basal region of the cochlea. ECAP slopes were steeper in the apical region compared to the basal region of the cochlea and ECAP thresholds were lower in the middle region compared to the basal region of the cochlea. The incidence of double peaks was greater upon stimulation of the apical region compared to the basal region of the cochlea. This data indicates that the site and intensity of cochlear stimulation affect ECAP properties.

  20. Napa River Restoration Project: Oakville to Oak Knoll Reach, Group C Site 14

    EPA Pesticide Factsheets

    Information about the SFBWQP Napa River Restoration Project: Oakville to Oak Knoll Reach, Group C Site 14, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  1. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate themore » facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.« less

  2. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krauss, Mark J

    This document constitutes an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction (UR) Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the URmore » Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-23-17, Contaminated Wash (Parcel H). This UR was established as part of FFACO corrective actions and was based on the presence of total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level at the time of the initial investigation.« less

  3. The fish gill: site of action and model for toxic effects of environmental pollutants.

    PubMed Central

    Evans, D H

    1987-01-01

    The gill epithelium is the site of gas exchange, ionic regulation, acid-base balance, and nitrogenous waste excretion by fishes. The last three processes are controlled by passive and active transport of various solutes across the epithelium. Various environmental pollutants (e.g., heavy metals, acid rain, and organic xenobiotics) have been found to affect the morphology of the gill epithelium. Associated with these morphological pathologies, one finds alterations in blood ionic levels, as well as gill Na,K-activated ATPase activity and ionic fluxes. Such physiological disturbances may underly the toxicities of these pollutants. In addition, the epithelial transport steps which are affected in the fish gill model resemble those described in the human gut and kidney, sites of action of a variety of environmental toxins. Images FIGURE 1. a FIGURE 1. b FIGURE 3. PMID:3297663

  4. The Benefits and Challenges of Enterprise Education: Results from an Action Research Project in the Third Grade in Finnish Basic Education

    ERIC Educational Resources Information Center

    Elo, Janne

    2016-01-01

    This article is the result of an action research project conducted in 2014 in a primary school in the city of Vaasa in Finland. The project focused on developing the practice of integrating enterprise education as a part of everyday teaching in Grade Three. The project involved three class teachers, the headmaster and a university researcher. This…

  5. Superfund Record of Decision (EPA Region 3): Voortman Farm Site, Lehigh County, Pennsylvania (first remedial action) June 1988. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-06-30

    The 43-acre Voortman Farm site is located in Upper Salucon Township, Lehigh County, Pennsylvania. The site consists of a sinkhole that contained empty battery casings disposed of in late 1979 and early 1980. Citizen complaints in 1980 prompted the prohibition of dumping and subsequent site investigation. In September 1986, the battery casings in the sinkhole caught on fire. Since the battery casings were burning underground, attempts to extinguish the fire remained unsuccessful. There does not appear to be any leaching from any residual metals, contaminated soils or battery casings present. The selected remedial action for the site is included.

  6. Project X: competitive intelligence data mining and analysis

    NASA Astrophysics Data System (ADS)

    Gilmore, John F.; Pagels, Michael A.; Palk, Justin

    2001-03-01

    Competitive Intelligence (CI) is a systematic and ethical program for gathering and analyzing information about your competitors' activities and general business trends to further your own company's goals. CI allows companies to gather extensive information on their competitors and to analyze what the competition is doing in order to maintain or gain a competitive edge. In commercial business this potentially translates into millions of dollars in annual savings or losses. The Internet provides an overwhelming portal of information for CI analysis. The problem is how a company can automate the translation of voluminous information into valuable and actionable knowledge. This paper describes Project X, an agent-based data mining system specifically developed for extracting and analyzing competitive information from the Internet. Project X gathers CI information from a variety of sources including online newspapers, corporate websites, industry sector reporting sites, speech archiving sites, video news casts, stock news sites, weather sites, and rumor sites. It uses individual industry specific (e.g., pharmaceutical, financial, aerospace, etc.) commercial sector ontologies to form the knowledge filtering and discovery structures/content required to filter and identify valuable competitive knowledge. Project X is described in detail and an example competitive intelligence case is shown demonstrating the system's performance and utility for business intelligence.

  7. China action of "Cleanup Plan for Polychlorinated Biphenyls Burial Sites": emissions during excavation and thermal desorption of a capacitor-burial site.

    PubMed

    Yang, Bing; Zhou, Lingli; Xue, Nandong; Li, Fasheng; Wu, Guanglong; Ding, Qiong; Yan, Yunzhong; Liu, Bo

    2013-10-01

    Scarce data are available so far on emissions in a given scenario for excavation and thermal desorption, a common practice, of soils contaminated with polychlorinated biphenyls (PCBs). As part of China action of "Cleanup Plan for PCBs Burial Sites", this study roughly estimated PCBs emissions in the scenario for a capacitor-burial site. The concentrations of total PCBs (22 congeners) in soils were in the range of 2.1-16,000μg/g with a mean of 2300μg/g, among the same order of magnitude as the highest values obtained in various PCBs-contaminated sites. Only six congeners belonging to Di-, Tri-, and Tetra-CBs were observed above limits of detection in air samples in the scenario, partially which can be estimated by the USEPA air emission model. Comparing concentrations and composition profiles of PCBs in the soil and air samples further indicated a leaked source of commercial PCBs formulations of trichlorobiphenyl (China PCB no. 1). The measures taken if any to mitigate the volatilization and movement of PCBs and to minimize worker exposure were discussed for improvements of the excavation practice. Copyright © 2013 Elsevier Inc. All rights reserved.

  8. Superfund Record of Decision (EPA Region 7): Mid-America Tanning site, Sergeant bBluff, IA. (First remedial action), September 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-24

    The 98.7-acre Mid-America Tanning site is a former leather tannery in Sergeant Bluff, Woodbury County, Iowa. Surrounding land use is mixed industrial and agricultural. A portion of the site is bordered by Oxbow Lake and lies within the 100-year floodplain. The Missouri River is approximately 1.5 miles to the southwest of the site and receives discharges from Oxbow Lake. The facility began onsite processing of animal hides in 1970. In 1980, the State confirmed the onsite burial of chromium-containing sludge in trenches, and the company was cited for permit violations. A 1985 EPA investigation identified excessive chromium contamination in onsitemore » soil, sediment, and ground water. In 1990, EPA conducted a removal action that included excavating and consolidating onsite 1,290 cubic yards of sludge from the trench disposal area. The Record of Decision (ROD) addresses the contaminated soil, impoundment sediment and water, and the excavated trench material. A future ROD will address onsite ground water contamination. The primary contaminant of concern affecting the soil, sediment, debris, sludge, and surface water are metals including chromium and lead. The selected remedial action for the site is included.« less

  9. Intensive Group Learning and On-Site Services to Improve Sexual and Reproductive Health Among Young Adults in Liberia: A Randomized Evaluation of HealthyActions.

    PubMed

    Firestone, Rebecca; Moorsmith, Reid; James, Simon; Urey, Marilyn; Greifinger, Rena; Lloyd, Danielle; Hartenberger-Toby, Lisa; Gausman, Jewel; Sanoe, Musa

    2016-09-28

    Young Liberians, particularly undereducated young adults, face substantial sexual and reproductive health (SRH) challenges, with low uptake of contraceptive methods, high rates of unintended pregnancy, and low levels of knowledge about HIV status. The purpose of this study was to assess the impact of a 6-day intensive group learning intervention combined with on-site SRH services (called HealthyActions) among out-of-school young adults, implemented through an existing alternative education program, on uptake of contraception and HIV testing and counseling (HTC). The intervention was implemented among young women and men ages 15-35 who were enrolled in alternative basic education learning sites in 5 counties of Liberia. We conducted a randomized evaluation to assess program impact. Baseline data were collected in January-March 2014, and endline data in June-July 2014. Key outcomes of condom use, contraceptive use, and HTC were estimated with difference-in-difference models using fixed effects. All analyses were conducted in Stata 13. We assessed outcomes for 1,157 learners at baseline and 1,052 learners at endline, across 29 treatment and 26 control sites. After adjusting for potential confounders, learners in the HealthyActions intervention group were 12% less likely to report never using a condom with a regular partner over the last month compared with the control group (P = .02). Female learners who received HealthyActions were 13% more likely to use any form of modern contraception compared with learners in control sites (P<.001), with the greatest increase in the use of contraceptive implants. Learners in HealthyActions sites were 45% more likely to have received HTC (P<.001). Providing intensive group learning in a supportive environment coupled with on-site health services improved SRH outcomes among participating learners. The focus of HealthyActions on participatory learning for low-literacy populations presents an adaptable solution for health

  10. Intensive Group Learning and On-Site Services to Improve Sexual and Reproductive Health Among Young Adults in Liberia: A Randomized Evaluation of HealthyActions

    PubMed Central

    Firestone, Rebecca; Moorsmith, Reid; James, Simon; Urey, Marilyn; Greifinger, Rena; Lloyd, Danielle; Hartenberger-Toby, Lisa; Gausman, Jewel; Sanoe, Musa

    2016-01-01

    ABSTRACT Introduction: Young Liberians, particularly undereducated young adults, face substantial sexual and reproductive health (SRH) challenges, with low uptake of contraceptive methods, high rates of unintended pregnancy, and low levels of knowledge about HIV status. The purpose of this study was to assess the impact of a 6-day intensive group learning intervention combined with on-site SRH services (called HealthyActions) among out-of-school young adults, implemented through an existing alternative education program, on uptake of contraception and HIV testing and counseling (HTC). Methods: The intervention was implemented among young women and men ages 15–35 who were enrolled in alternative basic education learning sites in 5 counties of Liberia. We conducted a randomized evaluation to assess program impact. Baseline data were collected in January–March 2014, and endline data in June–July 2014. Key outcomes of condom use, contraceptive use, and HTC were estimated with difference-in-difference models using fixed effects. All analyses were conducted in Stata 13. Results: We assessed outcomes for 1,157 learners at baseline and 1,052 learners at endline, across 29 treatment and 26 control sites. After adjusting for potential confounders, learners in the HealthyActions intervention group were 12% less likely to report never using a condom with a regular partner over the last month compared with the control group (P = .02). Female learners who received HealthyActions were 13% more likely to use any form of modern contraception compared with learners in control sites (P<.001), with the greatest increase in the use of contraceptive implants. Learners in HealthyActions sites were 45% more likely to have received HTC (P<.001). Conclusion: Providing intensive group learning in a supportive environment coupled with on-site health services improved SRH outcomes among participating learners. The focus of HealthyActions on participatory learning for low

  11. Archaeological Investigations at Site 45-DO-285, Chief Joseph Dam Project, Washington.

    DTIC Science & Technology

    1984-01-01

    systematic design. Sampling strata were created by dividing the site Into seven sets of grid units, each composed of 25 2 x 2-in units arranged in squares...NISP=23) C-r-s-my pJc (painted turtle) -- 23 elements. Painted turtle Is the only turtle currently I lving in the project area. Clemmys marmoraa

  12. Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    2002-09-01

    The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less

  13. The Union RAP: Industry-Wide Research-Action Projects to Win Health and Safety Improvements

    PubMed Central

    McQuiston, Thomas H.; Lippin, Tobi Mae; Anderson, Leeann G.; Beach, M. Josie; Frederick, James; Seymour, Thomas A.

    2009-01-01

    Unions are ripe to engage in community-based participatory research (CBPR). We briefly profile 3 United Steelworker CBPR projects aimed at uncovering often-undocumented, industry-wide health and safety conditions in which US industrial workers toil. The results are to be used to advocate improvements at workplace, industry, and national policy levels. We offer details of our CBPR approach (Research-Action Project [RAP]) that engages workers and others in all research stages. Elements of RAPs include strategically constructed teams with knowledge of the industry and health and safety and with skills in research, participatory facilitation, and training; reciprocal training on these knowledge and skill areas; iterative processes of large and small group work; use of technology; and facilitator-developed tools and intermediate products. PMID:19890145

  14. Corrective Action Investigation Plan for Corrective Action Unit 168: Areas 25 and 26 Contaminated Materials and Waste Dumps, Nevada Test Site, Nevada (Rev. 0) includes Record of Technical Change No. 1 (dated 8/28/2002), Record of Technical Change No. 2 (dated 9/23/2002), and Record of Technical Change No. 3 (dated 6/2/2004)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit 168 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 168 consists of a group of twelve relatively diverse Corrective Action Sites (CASs 25-16-01, Construction Waste Pile; 25-16-03, MX Construction Landfill; 25-19-02, Waste Disposal Site; 25-23-02, Radioactive Storage RR Cars; 25-23-18, Radioactive Material Storage; 25-34-01, NRDS Contaminated Bunker; 25-34-02, NRDS Contaminated Bunker; CAS 25-23-13, ETL - Lab Radioactive Contamination; 25-99-16, USW G3;more » 26-08-01, Waste Dump/Burn Pit; 26-17-01, Pluto Waste Holding Area; 26-19-02, Contaminated Waste Dump No.2). These CASs vary in terms of the sources and nature of potential contamination. The CASs are located and/or associated wit h the following Nevada Test Site (NTS) facilities within three areas. The first eight CASs were in operation between 1958 to 1984 in Area 25 include the Engine Maintenance, Assembly, and Disassembly Facility; the Missile Experiment Salvage Yard; the Reactor Maintenance, Assembly, and Disassembly Facility; the Radioactive Materials Storage Facility; and the Treatment Test Facility Building at Test Cell A. Secondly, the three CASs located in Area 26 include the Project Pluto testing area that operated from 1961 to 1964. Lastly, the Underground Southern Nevada Well (USW) G3 (CAS 25-99-16), a groundwater monitoring well located west of the NTS on the ridgeline of Yucca Mountain, was in operation during the 1980s. Based on site history and existing characterization data obtained to support the data quality objectives process, contaminants of potential concern (COPCs) for CAU 168 are primarily radionuclide; however, the COPCs for several CASs were not defined. To address COPC

  15. Progress Report on Landing Site Evaluation for the Next Japanese Lunar Exploration Project: SELENE-2

    NASA Astrophysics Data System (ADS)

    Saiki, K.; Arai, T.; Araki, H.; Ishihara, Y.; Ohtake, M.; Karouji, Y.; Kobayashi, N.; Sugihara, T.; Haruyama, J.; Honda, C.

    2010-12-01

    SELENE-2 is the next Japanese lunar exploration project that is planned to be launched by the end of fiscal year 2015. In order to select the landing site candidates which maximize the scientific return from the project, "SELENE-2 Landing Site Research Board" was organized in March, 2010. The board called for scientific proposals with landing site candidates from domestic researchers who are interested in lunar science and members of the Japanese Society for Planetary Sciences, Japan Association of Mineralogical Sciences, the Geochemical Society of Japan, Seismological society of Japan, or the Geodetic society of Japan. At present, we have 35 scientific proposals with over 70 landing site candidates submitted from 21 groups. The proposals were categorized into nine research subjects as follows: 1) Identification of mantle materials, 2) Temporal variation of igneous activity and thermal history of the moon, 3) Lava morphology, 4) Origin of swirl, 5) Crater formation mechanism, 6) Core size, 7) Internal structure (crust - mantle), 8) Origin of the region enriched in heat source elements, and 9) Origin of highland crust. We are evaluating the proposals with the landing sites, and discussing the scientific target of SELENE-2. Within 6 months, we will propose several model missions which execute the scientific exploration with the highest priority today. In our presentation, the present landing site candidates, the policy of the selection, and a plan of a further landing site selection process would be shown.

  16. Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTC-1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Kauss

    2011-06-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From

  17. Report: American Recovery and Reinvestment Act Site Inspection of Sewer System Improvement Projects, City of Parma, Ohio

    EPA Pesticide Factsheets

    Report #11-R-0083, February 2, 2011. Based upon our site inspection, no problems were identified that would require action from the city, the State of Ohio, or the U.S. Environmental Protection Agency.

  18. Possibilities For The LAGUNA Projects At The Fréjus Site

    NASA Astrophysics Data System (ADS)

    Mosca, Luigi

    2010-11-01

    The present laboratory (LSM) at the Fréjus site and the project of a first extension of it, mainly aimed at the next generation of dark matter and double beta decay experiments, are briefly reviewed. Then the main characteristics of the LAGUNA cooperation and Design Study network are summarized. Seven underground sites in Europe are considered in LAGUNA and are under study as candidates for the installation of Megaton scale detectors using three different techniques: a liquid Argon TPC (GLACIER), a liquid scintillator detector (LENA) and a Water Cerenkov (MEMPHYS), all mainly aimed at investigation of proton decay and properties of neutrinos from SuperNovae and other astrophysical sources as well as from accelerators (Super-beams and/or Beta-beams from CERN). One of the seven sites is located at Fréjus, near the present LSM laboratory, and the results of its feasibility study are presented and discussed. Then the physics potential of a MEMPHYS detector installed in this site are emphasized both for non-accelerator and for neutrino beam based configurations. The MEMPHYNO prototype with its R&D programme is presented. Finally a possible schedule is sketched.

  19. Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    2000-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L

  20. Planning a multi-site, complex intervention for homeless people with mental illness: the relationships between the national team and local sites in Canada's At Home/Chez Soi project.

    PubMed

    Nelson, Geoffrey; Macnaughton, Eric; Goering, Paula; Dudley, Michael; O'Campo, Patricia; Patterson, Michelle; Piat, Myra; Prévost, Natasha; Strehlau, Verena; Vallée, Catherine

    2013-06-01

    This research focused on the relationships between a national team and five project sites across Canada in planning a complex, community intervention for homeless people with mental illness called At Home/Chez Soi, which is based on the Housing First model. The research addressed two questions: (a) what are the challenges in planning? and (b) what factors that helped or hindered moving project planning forward? Using qualitative methods, 149 national, provincial, and local stakeholders participated in key informant or focus group interviews. We found that planning entails not only intervention and research tasks, but also relational processes that occur within an ecology of time, local context, and values. More specifically, the relationships between the national team and the project sites can be conceptualized as a collaborative process in which national and local partners bring different agendas to the planning process and must therefore listen to, negotiate, discuss, and compromise with one another. A collaborative process that involves power-sharing and having project coordinators at each site helped to bridge the differences between these two stakeholder groups, to find common ground, and to accomplish planning tasks within a compressed time frame. While local context and culture pushed towards unique adaptations of Housing First, the principles of the Housing First model provided a foundation for a common approach across sites and interventions. The implications of the findings for future planning and research of multi-site, complex, community interventions are noted.

  1. A Harder Rain is Going to Fall: Challenges for Actionable Projections of Extremes

    NASA Astrophysics Data System (ADS)

    Collins, W.

    2014-12-01

    Hydrometeorological extremes are projected to increase in both severity and frequency as the Earth's surface continues to warm in response to anthropogenic emissions of greenhouse gases. These extremes will directly affect the availability and reliability of water and other critical resources. The most comprehensive suite of multi-model projections has been assembled under the Coupled Model Intercomparison Project version 5 (CMIP5) and assessed in the Fifth Assessment (AR5) of the Intergovernmental Panel on Climate Change (IPCC). In order for these projections to be actionable, the projections should exhibit consistency and fidelity down to the local length and timescales required for operational resource planning, for example the scales relevant for water allocations from a major watershed. In this presentation, we summarize the length and timescales relevant for resource planning and then use downscaled versions of the IPCC simulations over the contiguous United States to address three questions. First, over what range of scales is there quantitative agreement between the simulated historical extremes and in situ measurements? Second, does this range of scales in the historical and future simulations overlap with the scales relevant for resource management and adaptation? Third, does downscaling enhance the degree of multi-model consistency at scales smaller than the typical global model resolution? We conclude by using these results to highlight requirements for further model development to make the next generation of models more useful for planning purposes.

  2. Translational Scholarship and a Palliative Approach: Enlisting the Knowledge-As-Action Framework.

    PubMed

    Reimer-Kirkham, Sheryl; Doane, Gweneth Hartrick; Antifeau, Elisabeth; Pesut, Barbara; Porterfield, Pat; Roberts, Della; Stajduhar, Kelli; Wikjord, Nicole

    2015-01-01

    Based on a retheorized epistemology for knowledge translation (KT) that problematizes the "know-do gap" and conceptualizes the knower, knowledge, and action as inseparable, this paper describes the application of the Knowledge-As-Action Framework. When applied as a heuristic device to support an inquiry process, the framework with the metaphor of a kite facilitates a responsiveness to the complexities that characterize KT. Examples from a KT demonstration project on the integration of a palliative approach at 3 clinical sites illustrate the interrelatedness of 6 dimensions-the local context, processes, people, knowledge, fluctuating realities, and values.

  3. Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crowson, D.; Gibson, J.D.; Haase, C.S.

    1993-10-01

    The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Actmore » (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.« less

  4. Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impactedmore » groundwater« less

  5. Practicum in adapted physical activity: a Dewey-inspired action research project.

    PubMed

    Standal, Øyvind; Rugseth, Gro

    2014-07-01

    The purpose of this study was to investigate what adapted physical activity (APA) students learn from their practicum experiences. One cohort of APA students participated, and data were generated from an action research project that included observations, reflective journals, and a focus group interview. The theoretical framework for the study was Dewey's and Wackerhausen's theories of reflections. The findings show the objects of students' reflections, the kind of conceptual resources they draw on while reflecting, and their knowledge interests. In addition, two paradoxes are identified: the tension between reflecting from and on own values, and how practicum as a valued experience of reality can become too difficult to handle. In conclusion, we reflect on how practicum learning can be facilitated.

  6. A Survey of Food Projects in the English NHS Regions and Health Action Zones in 2001

    ERIC Educational Resources Information Center

    Caraher, Martin; Cowburn, Gill

    2004-01-01

    Background and Objective: This article sets out the findings from an analysis of food projects, with a particular emphasis on fruit and vegetables, from the 26 Health Action Zones (HAZs) in England and those taking place within the former NHS regional areas in 2001. The objective was to gather information on the existing practice to inform future…

  7. 2015 Groundwater Monitoring Report Project Shoal Area: Subsurface Correction Unit 447

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    The Project Shoal Area in Nevada was the site of a 12-kiloton-yield underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. The corrective action strategy is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwatermore » flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. Although water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized to the agreement of both the U.S. Department of Energy Office of Legacy Management and the Nevada Division of Environmental Protection.« less

  8. Drinking-driving attitudes : a comparison of the first two household surveys of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1974-01-01

    This report provides an analysis of the community response to the public information countermeasure of the Fairfax Alcohol Safety Action Project, one thrust of a national effort to get the drunken driver off the highway. A series of in-depth househol...

  9. "Someone Had to Have Faith in Them as Professionals": An Evaluation of an Action Research Project to Develop Educational Leadership across the Early Years

    ERIC Educational Resources Information Center

    Henderson, Linda

    2017-01-01

    This article reports on an evaluation of three action research projects developed by a group of teachers working across the early years in three independent schools. The article examines the role of action research in developing educational leadership capabilities. Drawing on the educational leadership literature, concepts and ideas of action and…

  10. Predicting on-site environmental impacts of municipal engineering works

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process.

  11. Examples from the Greenland-Project - Gentle Remediation Optiones (GROs) on Pb/zn Contaminated Sites

    NASA Astrophysics Data System (ADS)

    Friesl-Hanl, Wolfgang; Kidd, Petra; Siebielec, Grzegorz

    2017-04-01

    The GREENLAND-project brought together "best practice" examples of several field applied gentle remediation techniques (EUFP7-project "Gentle remediation of trace element-contaminated land - GREENLAND; www.greenland-project.eu) with 17 partners from 11 countries. Gentle remediation options (GRO) comprise environmentally friendly technologies that have little or no negative impact on the soil. The main technologies are • phytoextraction • in situ immobilization and • assisted phytostabilization. Mining and processing activities affecting many sites worldwide negatively. The huge amounts of moved and treated materials have led to considerable flows of wastes and emissions. Alongside the many advantages of processed ores to our society, adverse effects in nature and risks for the environment and human health are observed. Three stages of impact of Pb/Zn-ore-treatment on the environment are discussed here: (1) On sites where the ores are mined impacts are the result of crushing, grinding, concentrating activities, and where additionally parts of the installations remain after abandoning the mine, as well as by the massive amounts of remaining deposits or wastes (mine tailings). (2) On sites where smelting and processing takes place, depending on the process (Welz, Doerschel) different waste materials are deposited. The Welz process waste generally contains less Cd and Pb than the Doerschel process waste which additionally shows higher water- extractable metals. (3) On sites close to the emitting source metal contamination can be found in areas for housing, gardening, and agricultural use. Emissions consist mainly from oxides and sulfides (Zn, Cd), sulfates (Zn, Pb, and Cd), chlorides (Pb) and carbonates (Cd). All these wastes and emissions pose potential risks of dispersion of pollutants into the food chain due to erosion (wind, water), leaching and the transfer into feeding stuff and food crops. In-situ treatments have the potential for improving the situation

  12. Probabilistic 21st and 22nd Century Sea-Level Projections at a Global Network of Tide-Gauge Sites

    NASA Technical Reports Server (NTRS)

    Kopp, Robert E.; Horton, Radley M.; Little, Christopher M.; Mitrovica, Jerry X.; Oppenheimer, Michael; Rasmussen, D. J.; Strauss, Benjamin H.; Tebaldi, Claudia

    2014-01-01

    Sea-level rise due to both climate change and non-climatic factors threatens coastal settlements, infrastructure, and ecosystems. Projections of mean global sea-level (GSL) rise provide insufficient information to plan adaptive responses; local decisions require local projections that accommodate different risk tolerances and time frames and that can be linked to storm surge projections. Here we present a global set of local sea-level (LSL) projections to inform decisions on timescales ranging from the coming decades through the 22nd century. We provide complete probability distributions, informed by a combination of expert community assessment, expert elicitation, and process modeling. Between the years 2000 and 2100, we project a very likely (90% probability) GSL rise of 0.5–1.2?m under representative concentration pathway (RCP) 8.5, 0.4–0.9?m under RCP 4.5, and 0.3–0.8?m under RCP 2.6. Site-to-site differences in LSL projections are due to varying non-climatic background uplift or subsidence, oceanographic effects, and spatially variable responses of the geoid and the lithosphere to shrinking land ice. The Antarctic ice sheet (AIS) constitutes a growing share of variance in GSL and LSL projections. In the global average and at many locations, it is the dominant source of variance in late 21st century projections, though at some sites oceanographic processes contribute the largest share throughout the century. LSL rise dramatically reshapes flood risk, greatly increasing the expected number of “1-in-10” and “1-in-100” year events.

  13. Probabilistic 21st and 22nd century sea-level projections at a global network of tide-gauge sites

    NASA Astrophysics Data System (ADS)

    Kopp, Robert E.; Horton, Radley M.; Little, Christopher M.; Mitrovica, Jerry X.; Oppenheimer, Michael; Rasmussen, D. J.; Strauss, Benjamin H.; Tebaldi, Claudia

    2014-08-01

    Sea-level rise due to both climate change and non-climatic factors threatens coastal settlements, infrastructure, and ecosystems. Projections of mean global sea-level (GSL) rise provide insufficient information to plan adaptive responses; local decisions require local projections that accommodate different risk tolerances and time frames and that can be linked to storm surge projections. Here we present a global set of local sea-level (LSL) projections to inform decisions on timescales ranging from the coming decades through the 22nd century. We provide complete probability distributions, informed by a combination of expert community assessment, expert elicitation, and process modeling. Between the years 2000 and 2100, we project a very likely (90% probability) GSL rise of 0.5-1.2 m under representative concentration pathway (RCP) 8.5, 0.4-0.9 m under RCP 4.5, and 0.3-0.8 m under RCP 2.6. Site-to-site differences in LSL projections are due to varying non-climatic background uplift or subsidence, oceanographic effects, and spatially variable responses of the geoid and the lithosphere to shrinking land ice. The Antarctic ice sheet (AIS) constitutes a growing share of variance in GSL and LSL projections. In the global average and at many locations, it is the dominant source of variance in late 21st century projections, though at some sites oceanographic processes contribute the largest share throughout the century. LSL rise dramatically reshapes flood risk, greatly increasing the expected number of "1-in-10" and "1-in-100" year events.

  14. Superfund Record of Decision (EPA Region 8): Anaconda Smelter site, (Operable Unit 11 - Flue Dust), Deer Lodge County, Anaconda, MT. (Second remedial action), September 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-23

    The 6,000-acre Anaconda Smelter site is a former copper and ore processing facility in Deer Lodge County, Montana. Land use in the area is predominantly residential. The site is bounded on the north and east, respectively, by the Warm Springs Creek and Mill Creek, both of which are potential sources of drinking water. From 1884 until 1980 when activities ceased, the site was used for ore processing and smelting operations. In 1988, EPA conducted an investigation to determine the nature and extent of the flue dust contamination. A 1988 ROD addressed the Mill Creek Operable Unit (OU15) and documented themore » relocation of residents from the community surrounding the smelter site as the selected remedial action. The Record of Decision (ROD) addresses the Flue Dust Operable Unit (OU11). The primary contaminants of concern affecting this site from the flue dust materials are metals including arsenic, cadmium, and lead. The selected remedial action for the site is included.« less

  15. No Further Action Decision Under CERCLA Study Area 43L Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    AES C. CHAMBERS Date RAC Environmental Coordinator U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BY/NE ) Date Fort Devens Remedial Project Manager...CERCLA STUDY AREA 43L HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...DECISION UNDER CERCLA STUDY AREA 43L HISTORIC GAS STATION SITES ! FORT DEVENS , MASSACHUSETTS I I I 5 Prepared for: U.S. Army Environmental Center I

  16. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-03-24

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. Themore » project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.« less

  17. Napa River Restoration Project: Oakville to Oak Knoll Reach, Group A Sites 21-23

    EPA Pesticide Factsheets

    Information about the SFBWQP Napa River Restoration Project: Oakville to Oak Knoll Reach, Group A Sites 21-23, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources

  18. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). Themore » restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.« less

  19. Superfund Record of Decision (EPA Region 9): El Toro Marine Corps Air Station, Operable Units 2A and 3A (no action sites), El Toro, CA, September 29, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This decision document presents the selected remedial action for Sites 4, 6, 9, 10, 13, 15, 19, 20, 21, 22, and 25 at MCAS El Toro in Orange County, California. The selected remedy for Sites, 4, 6, 9, 19, 13, 15, 19, 20, 21, 22, and 25 is no action.

  20. Seeking to Bridge the Divide: Linking Formal and Non-Formal Education in Uttar-Pradesh, India. IBE Collaborative Projects: Strengthening Capacities through Action

    ERIC Educational Resources Information Center

    Zutshi, Bupinder

    2004-01-01

    The new monograph series, IBE Collaborative Projects: Strengthening Capacities through Action, documents projects initiated and managed by local or national level institutions in diverse countries, which have been technically or academically assisted by UNESCO's International Bureau of Education (IBE). This first publication in the series…

  1. Women Reaching Women: A Story of Change. The Role of Narrative in Building Trust and Commitment during an Action Research Project

    ERIC Educational Resources Information Center

    Langley, Dawn

    2012-01-01

    Women Reaching Women was a three-year action research project aimed at raising awareness of world poverty, gender inequality and climate change. The project brought together the National Federation of Women's Institutes, Oxfam, the Everyone Foundation and a unique group of 28 women drawn from Women's Institutes across the country. The project…

  2. Supporting On-Site Teacher-Consultants: New York City Writing Project's Community of Learners

    ERIC Educational Resources Information Center

    Osterman, Ed

    2008-01-01

    This monograph describes and analyzes the particular processes and structures that the New York City Writing Project (NYCWP) directors and on-site teacher-consultants have developed that enable them to support and learn from each other and to reflect critically upon the work they do with teachers, students, and administrators. Over time the…

  3. We Make This Road as We Walk Together: Sharing Teacher Authority in a Social Action Curriculum Project

    ERIC Educational Resources Information Center

    Schultz, Brian D.; Oyler, Celia

    2006-01-01

    This article investigates issues of teacher authority and student initiations in a classroom-based social action curriculum project. A teacher (the first author of this article) and his fifth-grade, African-American students conceptualized, designed, and carried out a seven-month-long integrated curriculum and campaign to lobby for a sorely needed…

  4. Empowering Language Learners through the Use of a Curriculum-Integrated Information Literacy Programme: An Action Research Project

    ERIC Educational Resources Information Center

    Alzahrani, Sahar

    2017-01-01

    This paper implements and evaluates a curriculum-integrated information literacy programme in an Arabic primary school in the United Kingdom to empower learners and develop life-long learning skills. It reports on an action research project with a reflective practice approach used at the beginning of the semester to identify potential problems…

  5. Remedial Action Assessment System (RAAS): Evaluation of selected feasibility studies of CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) hazardous waste sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whelan, G.; Hartz, K.E.; Hilliard, N.D.

    1990-04-01

    Congress and the public have mandated much closer scrutiny of the management of chemically hazardous and radioactive mixed wastes. Legislative language, regulatory intent, and prudent technical judgment, call for using scientifically based studies to assess current conditions and to evaluate and select costeffective strategies for mitigating unacceptable situations. The NCP requires that a Remedial Investigation (RI) and a Feasibility Study (FS) be conducted at each site targeted for remedial response action. The goal of the RI is to obtain the site data needed so that the potential impacts on public health or welfare or on the environment can be evaluatedmore » and so that the remedial alternatives can be identified and selected. The goal of the FS is to identify and evaluate alternative remedial actions (including a no-action alternative) in terms of their cost, effectiveness, and engineering feasibility. The NCP also requires the analysis of impacts on public health and welfare and on the environment; this analysis is the endangerment assessment (EA). In summary, the RI, EA, and FS processes require assessment of the contamination at a site, of the potential impacts in public health or the environment from that contamination, and of alternative RAs that could address potential impacts to the environment. 35 refs., 7 figs., 1 tab.« less

  6. Give Water a Hand. Home Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water and water conservation within the home while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  7. Give Water a Hand. Community Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation within a community, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  8. 75 FR 26709 - Clarke County Water Supply Project, Clarke County, IA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... Project, Clarke County, IA AGENCY: Natural Resources Conservation Service. ACTION: Notice of intent to... Conservationist for Planning, 210 Walnut Street, Room 693, Des Moines, IA 50309-2180, telephone: 515-284- 4769... available at the Iowa NRCS Web site at http://www.ia.nrcs.usda.gov . A map of the Clarke County Water Supply...

  9. Removal site evaluation report for the Isotope Facilities at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazardmore » areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated.« less

  10. A progress report on the ARRA-funded geotechnical site characterization project

    NASA Astrophysics Data System (ADS)

    Martin, A. J.; Yong, A.; Stokoe, K.; Di Matteo, A.; Diehl, J.; Jack, S.

    2011-12-01

    calculated VS30 for each site-will be prepared after the completion of the project in November 2011.

  11. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & Building 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the March 2000, Corrective Action Decision Document / Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points (TTR) as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. Themore » approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-51-001-0355 – Photo Shop UDP, Drains in CAU 429. It should be noted that there are no changes to CAU 406. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the

  12. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites wheremore » residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.« less

  13. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    ERIC Educational Resources Information Center

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's Researching…

  14. Toward Solutions: The Work of the Biology Action-Research Group. Learning in Science Project. Working Paper No. 29.

    ERIC Educational Resources Information Center

    Boe, Robyn; And Others

    Many students, even after formal science instruction, have not developed a scientifically acceptable concept of "living,""animal," or "plant." Therefore, as part of the action-research phase of the Learning in Science Project, a working group was formed to explore (with teachers) some possible strategies aimed at…

  15. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section}7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown andmore » waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd{sup 3}). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi northeast of the sites on land administered by the Bureau of Land Management (BLM).« less

  16. Integrated Assessment of Prevention and Restoration Actions to Combat Desertification

    NASA Astrophysics Data System (ADS)

    Bautista, S.; Orr, B. J.; Vallejo, R.

    2009-12-01

    Recent advances in desertification and land degradation research have provided valuable conceptual and analytical frameworks, degradation indicators, assessment tools and surveillance systems with respect to desertification drivers, processes, and impacts. These findings, together with stakeholders’ perceptions and local/regional knowledge, have helped to define and propose measures and strategies to combat land degradation. However, integrated and comprehensive assessment and evaluation of prevention and restoration strategies and techniques to combat desertification is still lacking, and knowledge on the feasibility and cost-effectiveness of the proposed strategies over a wide range of environmental and socio-economic conditions is very scarce. To address this challenge, we have launched a multinational project (PRACTICE - Prevention and Restoration Actions to Combat Desertification. An Integrated Assessment), funded by the European Commission, in order to link S & T advances and traditional knowledge on prevention and restoration practices to combat desertification with sound implementation, learning and adaptive management, knowledge sharing, and dissemination of best practices. The key activities for pursuing this goal are (1) to establish a platform and information system of long-term monitoring sites for assessing sustainable management and actions to combat desertification, (2) to define an integrated protocol for the assessment of these actions, and (3) to link project assessment and evaluation with training and education, adaptive management, and knowledge sharing and dissemination through a participatory approach involving scientists, managers, technicians, financial officers, and members of the public who are/were impacted by the desertification control projects. Monitoring sites are distributed in the Mediterranean Europe (Greece, Italy, Spain, and Portugal), Africa (Morocco, Namibia, South Africa), Middle East (Israel), China, and South and North

  17. Information brochure on the Department of Energy's proposed Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. Project overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This project overview comprises the following: project history; WIPP fact sheet; legal actions required; major WIPP milestones; low-level waste volumes; nuclear waste transportation; WIPP site selection; and questions and answers from the Department of Energy request for public input prior to public meetings in Roswell and Hobbs, New Mexico.

  18. Ethics Review for a Multi-Site Project Involving Tribal Nations in the Northern Plains.

    PubMed

    Angal, Jyoti; Petersen, Julie M; Tobacco, Deborah; Elliott, Amy J

    2016-04-01

    Increasingly, Tribal Nations are forming ethics review panels, which function separately from institutional review boards (IRBs). The emergence of strong community representation coincides with a widespread effort supported by the U.S. Department of Health & Human Services and other federal agencies to establish a single IRB for all multi-site research. This article underscores the value of a tribal ethics review board and describes the tribal oversight for the Safe Passage Study-a multi-site, community-based project in the Northern Plains. Our experience demonstrates the benefits of tribal ethics review and makes a strong argument for including tribal oversight in future regulatory guidance for multi-site, community-based research. © The Author(s) 2016.

  19. International Partnership in Educational Strategic Planning and Evaluation: The Muffles College Project.

    ERIC Educational Resources Information Center

    Satterlee, Brian

    The Florida Association of Voluntary Agencies for Caribbean Action was formed by the state's Governor to increase cooperation with Caribbean nations and provide on-site technical assistance and training in health, agriculture, social services, and education. In 1996, the Association conducted a project with Muffles College, a junior college in…

  20. Blood alcohol test results of motor vehicle deaths as an evaluation method for the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1973-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was started following the June 1971 approval of the proposal and working plan submitted to the Department of Transportation by the Highway Safety Division of Virginia. A total of $2,123,000 was allocat...