Sample records for additional resources required

  1. Production scheduling with discrete and renewable additional resources

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Grabowik, C.; Paprocka, I.; Kempa, W.

    2015-11-01

    In this paper an approach to planning of additional resources when scheduling operations are discussed. The considered resources are assumed to be discrete and renewable. In most research in scheduling domain, the basic and often the only type of regarded resources is a workstation. It can be understood as a machine, a device or even as a separated space on the shop floor. In many cases, during the detailed scheduling of operations the need of using more than one resource, required for its implementation, can be indicated. Resource requirements for an operation may relate to different resources or resources of the same type. Additional resources are most often referred to these human resources, tools or equipment, for which the limited availability in the manufacturing system may have an influence on the execution dates of some operations. In the paper the concept of the division into basic and additional resources and their planning method was shown. A situation in which sets of basic and additional resources are not separable - the same additional resource may be a basic resource for another operation is also considered. Scheduling of operations, including greater amount of resources can cause many difficulties, depending on whether the resource is involved in the entire time of operation, only in the selected part(s) of operation (e.g. as auxiliary staff at setup time) or cyclic - e.g. when an operator supports more than one machine, or supervises the execution of several operations. For this reason the dates and work times of resources participation in the operation can be different. Presented issues are crucial when modelling of production scheduling environment and designing of structures for the purpose of scheduling software development.

  2. 18 CFR 154.400 - Additional requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Additional requirements. 154.400 Section 154.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Limited Rate Changes § 154...

  3. 18 CFR 154.400 - Additional requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Additional requirements. 154.400 Section 154.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Limited Rate Changes § 154...

  4. 18 CFR 154.400 - Additional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Additional requirements. 154.400 Section 154.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Limited Rate Changes § 154...

  5. 18 CFR 154.400 - Additional requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Additional requirements. 154.400 Section 154.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Limited Rate Changes § 154...

  6. 18 CFR 154.400 - Additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Additional requirements. 154.400 Section 154.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT RATE SCHEDULES AND TARIFFS Limited Rate Changes § 154...

  7. 33 CFR 203.83 - Additional requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Additional requirements. 203.83 Section 203.83 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER PROCEDURES Local Interests...

  8. 33 CFR 203.83 - Additional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Additional requirements. 203.83 Section 203.83 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER PROCEDURES Local Interests...

  9. 33 CFR 203.83 - Additional requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Additional requirements. 203.83 Section 203.83 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER PROCEDURES Local Interests...

  10. 33 CFR 203.83 - Additional requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Additional requirements. 203.83 Section 203.83 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER PROCEDURES Local Interests...

  11. 30 CFR 75.1103-10 - Fire suppression systems; additional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... per minute, an additional cache of the materials specified in § 75.1103-9(a)(1), (2), and (3) shall be... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fire suppression systems; additional requirements. 75.1103-10 Section 75.1103-10 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT...

  12. 30 CFR 75.1103-10 - Fire suppression systems; additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements. 75.1103-10 Section 75.1103-10 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT... Protection § 75.1103-10 Fire suppression systems; additional requirements. For each conveyor belt flight... per minute, an additional cache of the materials specified in § 75.1103-9(a)(1), (2), and (3) shall be...

  13. 30 CFR 75.151 - Tests for methane; qualified person; additional requirement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Tests for methane; qualified person; additional... Certified Persons § 75.151 Tests for methane; qualified person; additional requirement. Notwithstanding the... methane unless he demonstrates to the satisfaction of an authorized representative of the Secretary that...

  14. 30 CFR 75.151 - Tests for methane; qualified person; additional requirement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Tests for methane; qualified person; additional... Certified Persons § 75.151 Tests for methane; qualified person; additional requirement. Notwithstanding the... methane unless he demonstrates to the satisfaction of an authorized representative of the Secretary that...

  15. Projections of costs, financing, and additional resource requirements for low- and lower middle-income country immunization programs over the decade, 2011-2020.

    PubMed

    Gandhi, Gian; Lydon, Patrick; Cornejo, Santiago; Brenzel, Logan; Wrobel, Sandra; Chang, Hugh

    2013-04-18

    The Decade of Vaccines Global Vaccine Action Plan has outlined a set of ambitious goals to broaden the impact and reach of immunization across the globe. A projections exercise has been undertaken to assess the costs, financing availability, and additional resource requirements to achieve these goals through the delivery of vaccines against 19 diseases across 94 low- and middle-income countries for the period 2011-2020. The exercise draws upon data from existing published and unpublished global forecasts, country immunization plans, and costing studies. A combination of an ingredients-based approach and use of approximations based on past spending has been used to generate vaccine and non-vaccine delivery costs for routine programs, as well as supplementary immunization activities (SIAs). Financing projections focused primarily on support from governments and the GAVI Alliance. Cost and financing projections are presented in constant 2010 US dollars (US$). Cumulative total costs for the decade are projected to be US$57.5 billion, with 85% for routine programs and the remaining 15% for SIAs. Delivery costs account for 54% of total cumulative costs, and vaccine costs make up the remainder. A conservative estimate of total financing for immunization programs is projected to be $34.3 billion over the decade, with country governments financing 65%. These projections imply a cumulative funding gap of $23.2 billion. About 57% of the total resources required to close the funding gap are needed just to maintain existing programs and scale up other currently available vaccines (i.e., before adding in the additional costs of vaccines still in development). Efforts to mobilize additional resources, manage program costs, and establish mutual accountability between countries and development partners will all be necessary to ensure the goals of the Decade of Vaccines are achieved. Establishing or building on existing mechanisms to more comprehensively track resources and

  16. 30 CFR 250.177 - What additional requirements may the Regional Supervisor order for a suspension?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What additional requirements may the Regional... Suspensions § 250.177 What additional requirements may the Regional Supervisor order for a suspension? If MMS grants or directs a suspension under paragraph § 250.172(b), the Regional Supervisor may require you to...

  17. 30 CFR 250.1166 - What additional reporting is required for developments in the Alaska OCS Region?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What additional reporting is required for... CONTINENTAL SHELF Oil and Gas Production Requirements Other Requirements § 250.1166 What additional reporting... correlative rights; and (3) Maximize ultimate recovery of oil and gas. (b) If your development is jointly...

  18. 30 CFR 250.1166 - What additional reporting is required for developments in the Alaska OCS Region?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What additional reporting is required for... CONTINENTAL SHELF Oil and Gas Production Requirements Other Requirements § 250.1166 What additional reporting... correlative rights; and (3) Maximize ultimate recovery of oil and gas. (b) If your development is jointly...

  19. 10 CFR 20.2302 - Additional requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Additional requirements. 20.2302 Section 20.2302 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Exemptions and Additional Requirements § 20.2302 Additional requirements. The Commission may, by rule, regulation, or order, impose...

  20. 10 CFR 20.2302 - Additional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Additional requirements. 20.2302 Section 20.2302 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Exemptions and Additional Requirements § 20.2302 Additional requirements. The Commission may, by rule, regulation, or order, impose...

  1. 10 CFR 20.2302 - Additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Additional requirements. 20.2302 Section 20.2302 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION Exemptions and Additional Requirements § 20.2302 Additional requirements. The Commission may, by rule, regulation, or order, impose...

  2. 10 CFR 55.7 - Additional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Additional requirements. 55.7 Section 55.7 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.7 Additional requirements. The Commission may, by rule, regulation, or order, impose upon any licensee such requirements, in addition to...

  3. 10 CFR 55.7 - Additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Additional requirements. 55.7 Section 55.7 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.7 Additional requirements. The Commission may, by rule, regulation, or order, impose upon any licensee such requirements, in addition to...

  4. 30 CFR 77.102 - Tests for methane; oxygen deficiency; qualified person, additional requirement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Tests for methane; oxygen deficiency; qualified... methane; oxygen deficiency; qualified person, additional requirement. Notwithstanding the provisions of... and oxygen deficiency unless he has demonstrated to the satisfaction of an authorized representative...

  5. 30 CFR 77.102 - Tests for methane; oxygen deficiency; qualified person, additional requirement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Tests for methane; oxygen deficiency; qualified... methane; oxygen deficiency; qualified person, additional requirement. Notwithstanding the provisions of... and oxygen deficiency unless he has demonstrated to the satisfaction of an authorized representative...

  6. 30 CFR 77.102 - Tests for methane; oxygen deficiency; qualified person, additional requirement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Tests for methane; oxygen deficiency; qualified... methane; oxygen deficiency; qualified person, additional requirement. Notwithstanding the provisions of... and oxygen deficiency unless he has demonstrated to the satisfaction of an authorized representative...

  7. 30 CFR 77.102 - Tests for methane; oxygen deficiency; qualified person, additional requirement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Tests for methane; oxygen deficiency; qualified... methane; oxygen deficiency; qualified person, additional requirement. Notwithstanding the provisions of... and oxygen deficiency unless he has demonstrated to the satisfaction of an authorized representative...

  8. Lunar resource recovery: A definition of requirements

    NASA Technical Reports Server (NTRS)

    Elsworth, D.; Kohler, J. L.; Alexander, S. S.

    1992-01-01

    The capability to locate, mine, and process the natural resources of the Moon will be an essential requirement for lunar base development and operation. The list of materials that will be necessary is extensive and ranges from oxygen and hydrogen for fuel and life support to process tailings for emplacement over habitats. Despite the resources need, little is known about methodologies that might be suitable for utilizing lunar resources. This paper examines some of the requirements and constraints for resource recovery and identifies key areas of research needed to locate, mine, and process extraterrestrial natural resources.

  9. Institutional Resource Requirements, Management, and Accountability.

    ERIC Educational Resources Information Center

    Matlock, John; Humphries, Frederick S.

    A detailed resource management study was conducted at Tennessee State University, and resource management problems at other higher education institutions were identified through the exchange of data and studies. Resource requirements and management problems unique to black institutions were examined, as were the problems that arise from regional…

  10. 30 CFR 77.102 - Tests for methane; oxygen deficiency; qualified person, additional requirement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Tests for methane; oxygen deficiency; qualified... methane; oxygen deficiency; qualified person, additional requirement. Notwithstanding the provisions of § 77.101, on and after December 30, 1971, no person shall be a qualified person for testing for methane...

  11. 18 CFR 33.4 - Additional information requirements for applications involving vertical competitive impacts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Additional information requirements for applications involving vertical competitive impacts. 33.4 Section 33.4 Conservation of Power... electricity products (i.e., downstream relevant products) in the same geographic markets or that the extent of...

  12. 7 CFR 3015.161 - Additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Additional requirements. 3015.161 Section 3015.161 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.161 Additional requirements...

  13. Resource Requirements Planning for Hospitals Treating Serious Infectious Disease Cases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vugrin, Eric D.; Verzi, Stephen Joseph; Finley, Patrick D.

    This report presents a mathematical model of the way in which a hospital uses a variety of resources, utilities and consumables to provide care to a set of in-patients, and how that hospital might adapt to provide treatment to a few patients with a serious infectious disease, like the Ebola virus. The intended purpose of the model is to support requirements planning studies, so that hospitals may be better prepared for situations that are likely to strain their available resources. The current model is a prototype designed to present the basic structural elements of a requirements planning analysis. Some simplemore » illustrati ve experiments establish the mo del's general capabilities. With additional inve stment in model enhancement a nd calibration, this prototype could be developed into a useful planning tool for ho spital administrators and health care policy makers.« less

  14. FY 2001-2002 Mission Resource Requirements.

    ERIC Educational Resources Information Center

    South Carolina Commission on Higher Education, Columbia.

    This document describes the performance funding mission resource requirements for public institutions of higher education in South Carolina. It opens with sections of the state code, as amended in 1993, that define the annual budget requests of higher education institutions and outline the requirements for performance funding. The guiding…

  15. 42 CFR 417.592 - Additional benefits requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Additional benefits requirement. 417.592 Section... HEALTH CARE PREPAYMENT PLANS Medicare Payment: Risk Basis § 417.592 Additional benefits requirement. (a... benefits. Provide its Medicare enrollees with additional benefits in accordance with paragraph (c) of this...

  16. Modern Trends of Additional Professional Education Development for Mineral Resource Extracting

    NASA Astrophysics Data System (ADS)

    Borisova, Olga; Frolova, Victoria; Merzlikina, Elena

    2017-11-01

    The article contains the results of development of additional professional education research, including the field of mineral resource extracting in Russia. The paper describes the levels of education received in Russian Federation and determines the place and role of additional professional education among them. Key factors influencing the development of additional professional education are identified. As a result of the research, the authors proved the necessity of introducing additional professional education programs on educational Internet platforms for mineral resource extracting.

  17. Spacelab mission dependent training parametric resource requirements study

    NASA Technical Reports Server (NTRS)

    Ogden, D. H.; Watters, H.; Steadman, J.; Conrad, L.

    1976-01-01

    Training flows were developed for typical missions, resource relationships analyzed, and scheduling optimization algorithms defined. Parametric analyses were performed to study the effect of potential changes in mission model, mission complexity and training time required on the resource quantities required to support training of payload or mission specialists. Typical results of these analyses are presented both in graphic and tabular form.

  18. 15 CFR 971.420 - Resource conservation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... opportunity for the commercial recovery of the unrecovered balance of the hard mineral resources in the... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Resource conservation requirements. 971.420 Section 971.420 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade...

  19. 42 CFR 493.557 - Additional submission requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... scope of the specialty or subspecialty areas. (2) A description of the organization's data management..., Nonprofit Accreditation Organization or Exemption Under an Approved State Laboratory Program § 493.557 Additional submission requirements. (a) Specific requirements for accreditation organizations. In addition to...

  20. 10 CFR 70.74 - Additional reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Additional reporting requirements. 70.74 Section 70.74 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL Additional Requirements for Certain Licensees Authorized To Possess a Critical Mass of Special Nuclear...

  1. Addition of multiple limiting resources reduces grassland diversity.

    PubMed

    Harpole, W Stanley; Sullivan, Lauren L; Lind, Eric M; Firn, Jennifer; Adler, Peter B; Borer, Elizabeth T; Chase, Jonathan; Fay, Philip A; Hautier, Yann; Hillebrand, Helmut; MacDougall, Andrew S; Seabloom, Eric W; Williams, Ryan; Bakker, Jonathan D; Cadotte, Marc W; Chaneton, Enrique J; Chu, Chengjin; Cleland, Elsa E; D'Antonio, Carla; Davies, Kendi F; Gruner, Daniel S; Hagenah, Nicole; Kirkman, Kevin; Knops, Johannes M H; La Pierre, Kimberly J; McCulley, Rebecca L; Moore, Joslin L; Morgan, John W; Prober, Suzanne M; Risch, Anita C; Schuetz, Martin; Stevens, Carly J; Wragg, Peter D

    2016-09-01

    Niche dimensionality provides a general theoretical explanation for biodiversity-more niches, defined by more limiting factors, allow for more ways that species can coexist. Because plant species compete for the same set of limiting resources, theory predicts that addition of a limiting resource eliminates potential trade-offs, reducing the number of species that can coexist. Multiple nutrient limitation of plant production is common and therefore fertilization may reduce diversity by reducing the number or dimensionality of belowground limiting factors. At the same time, nutrient addition, by increasing biomass, should ultimately shift competition from belowground nutrients towards a one-dimensional competitive trade-off for light. Here we show that plant species diversity decreased when a greater number of limiting nutrients were added across 45 grassland sites from a multi-continent experimental network. The number of added nutrients predicted diversity loss, even after controlling for effects of plant biomass, and even where biomass production was not nutrient-limited. We found that elevated resource supply reduced niche dimensionality and diversity and increased both productivity and compositional turnover. Our results point to the importance of understanding dimensionality in ecological systems that are undergoing diversity loss in response to multiple global change factors.

  2. Spacelab user implementation assessment study. Volume 3: Resource requirements development

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The resources requirements for the integration and checkout of spacelab payloads are presented in three categories: mission-unique, sustaining, and non-recurring. The requirements are identified by concept and by center. Cost estimates for the resource requirements are also presented.

  3. Space Station Freedom resource allocation accommodation of technology payload requirements

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Collier, Lisa D.; Gartrell, Charles F.

    1990-01-01

    An overview of the Office of Aeronautics, Exploration, and Technology (OAET) Space Station Freedom Technology Payload Development Program is provided, and the OAET Station resource requirements are reviewed. The requirements are contrasted with current proposed resource allocations. A discussion of the issues and conclusions are provided. It is concluded that an overall 20 percent resource allocation is appropriate to support OAET's technology development program, that some resources are inadequate even at the 20 percent level, and that bartering resources among U.S. users and international partners and increasing the level of automation may be viable solutions to the resource constraint problem.

  4. Aggregation of Cricket Activity in Response to Resource Addition Increases Local Diversity.

    PubMed

    Szinwelski, Neucir; Rosa, Cassiano Sousa; Solar, Ricardo Ribeiro de Castro; Sperber, Carlos Frankl

    2015-01-01

    Crickets are often found feeding on fallen fruits among forest litter. Fruits and other sugar-rich resources are not homogeneously distributed, nor are they always available. We therefore expect that crickets dwelling in forest litter have a limited supply of sugar-rich resource, and will perceive this and displace towards resource-supplemented sites. Here we evaluate how sugar availability affects cricket species richness and abundance in old-growth Atlantic forest by spraying sugarcane syrup on leaf litter, simulating increasing availability, and collecting crickets via pitfall trapping. We found an asymptotic positive association between resource addition and species richness, and an interaction between resource addition and species identity on cricket abundance, which indicates differential effects of resource addition among cricket species. Our results indicate that 12 of the 13 cricket species present in forest litter are maintained at low densities by resource scarcity; this highlights sugar-rich resource as a short-term driver of litter cricket community structure in tropical forests. When resource was experimentally increased, species richness increased due to behavioral displacement. We present evidence that the density of many species is limited by resource scarcity and, when resources are added, behavioral displacement promotes increased species packing and alters species composition. Further, our findings have technical applicability for increasing sampling efficiency of local cricket diversity in studies aiming to estimate species richness, but with no regard to local environmental drivers or species-abundance characteristics.

  5. 46 CFR 133.07 - Additional equipment and requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Additional equipment and requirements. 133.07 Section 133.07 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS LIFESAVING SYSTEMS General § 133.07 Additional equipment and requirements. The OCMI may require an OSV to...

  6. 46 CFR 133.07 - Additional equipment and requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Additional equipment and requirements. 133.07 Section 133.07 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS LIFESAVING SYSTEMS General § 133.07 Additional equipment and requirements. The OCMI may require an OSV to...

  7. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  8. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  9. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  10. 14 CFR 1274.937 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... information technology resources. 1274.937 Section 1274.937 Aeronautics and Space NATIONAL AERONAUTICS AND... Conditions § 1274.937 Security requirements for unclassified information technology resources. Security Requirements for Unclassified Information Technology Resources July 2002 (a) The Recipient shall be responsible...

  11. 14 CFR 1274.937 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... information technology resources. 1274.937 Section 1274.937 Aeronautics and Space NATIONAL AERONAUTICS AND... Conditions § 1274.937 Security requirements for unclassified information technology resources. Security Requirements for Unclassified Information Technology Resources July 2002 (a) The Recipient shall be responsible...

  12. 14 CFR 1274.937 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... information technology resources. 1274.937 Section 1274.937 Aeronautics and Space NATIONAL AERONAUTICS AND... Conditions § 1274.937 Security requirements for unclassified information technology resources. Security Requirements for Unclassified Information Technology Resources July 2002 (a) The Recipient shall be responsible...

  13. 14 CFR 1274.937 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... information technology resources. 1274.937 Section 1274.937 Aeronautics and Space NATIONAL AERONAUTICS AND... Conditions § 1274.937 Security requirements for unclassified information technology resources. Security Requirements for Unclassified Information Technology Resources July 2002 (a) The Recipient shall be responsible...

  14. 75 FR 63113 - Financial Resources Requirements for Derivatives Clearing Organizations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... Resources Requirements for Derivatives Clearing Organizations AGENCY: Commodity Futures Trading Commission... regulations establish financial resources requirements for derivatives clearing organizations (DCOs) for the... DCO's organizational structure, i.e., whether or not the DCO is a membership organization. Clearing...

  15. 42 CFR 417.592 - Additional benefits requirement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Additional benefits requirement. 417.592 Section... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Risk Basis § 417.592 Additional benefits...) Additional benefits. Provide its Medicare enrollees with additional benefits in accordance with paragraph (c...

  16. 48 CFR 1352.239-72 - Security requirements for information technology resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology resources. 1352.239-72 Section 1352.239-72 Federal Acquisition Regulations System... Clauses 1352.239-72 Security requirements for information technology resources. As prescribed in 48 CFR 1339.270(b), insert the following clause: Security Requirements for Information Technology Resources...

  17. 48 CFR 1352.239-72 - Security requirements for information technology resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information technology resources. 1352.239-72 Section 1352.239-72 Federal Acquisition Regulations System... Clauses 1352.239-72 Security requirements for information technology resources. As prescribed in 48 CFR 1339.270(b), insert the following clause: Security Requirements for Information Technology Resources...

  18. 48 CFR 1352.239-72 - Security requirements for information technology resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology resources. 1352.239-72 Section 1352.239-72 Federal Acquisition Regulations System... Clauses 1352.239-72 Security requirements for information technology resources. As prescribed in 48 CFR 1339.270(b), insert the following clause: Security Requirements for Information Technology Resources...

  19. 48 CFR 1352.239-72 - Security requirements for information technology resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology resources. 1352.239-72 Section 1352.239-72 Federal Acquisition Regulations System... Clauses 1352.239-72 Security requirements for information technology resources. As prescribed in 48 CFR 1339.270(b), insert the following clause: Security Requirements for Information Technology Resources...

  20. 48 CFR 1352.239-72 - Security requirements for information technology resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology resources. 1352.239-72 Section 1352.239-72 Federal Acquisition Regulations System... Clauses 1352.239-72 Security requirements for information technology resources. As prescribed in 48 CFR 1339.270(b), insert the following clause: Security Requirements for Information Technology Resources...

  1. The Job Demands-Resources Model: An Analysis of Additive and Joint Effects of Demands and Resources

    ERIC Educational Resources Information Center

    Hu, Qiao; Schaufeli, Wilmar B.; Taris, Toon W.

    2011-01-01

    The present study investigated the additive, synergistic, and moderating effects of job demands and job resources on well-being (burnout and work engagement) and organizational outcomes, as specified by the Job Demands-Resources (JD-R) model. A survey was conducted among two Chinese samples: 625 blue collar workers and 761 health professionals. A…

  2. 29 CFR 1602.37 - Additional reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Report § 1602.37 Additional reporting requirements. The Commission reserves the right to require reports... employment practices of individual political jurisdictions or group of political jurisdictions whenever, in...

  3. Earth resources mission performance studies. Volume 1: Requirements definition

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The need for a realistic set of earth resources collection requirements to test and maximize the data gathering capabilities of the EOS remote sensor systems is considered. The collection requirements will be derived from established user requirements. In order to confine and bound the requirements study, some baseline assumptions were established. These are: (1) image acquisition is confined to the contiguous United States, (2) the fundamental data users are select participating federal agencies, (3) the acquired data will be applied to generating information necessary or in support of existing federal agency charters, and (4) the most pressing or desired federal agency earth resources data requirements have been defined, suggested, or implied in current available literature.

  4. 48 CFR 27.406-2 - Additional data requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Additional data... GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.406-2 Additional data requirements. (a) In some contracting situations, such as experimental, developmental...

  5. 48 CFR 27.406-2 - Additional data requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Additional data... GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.406-2 Additional data requirements. (a) In some contracting situations, such as experimental, developmental...

  6. 46 CFR 11.502 - Additional requirements for engineer endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Additional requirements for engineer endorsements. 11... SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.502 Additional requirements for engineer endorsements. (a) For all original and raise of grade of engineer...

  7. 46 CFR 11.502 - Additional requirements for engineer endorsements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Additional requirements for engineer endorsements. 11... SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.502 Additional requirements for engineer endorsements. (a) For all original and raise of grade of engineer...

  8. 46 CFR 11.502 - Additional requirements for engineer endorsements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Additional requirements for engineer endorsements. 11... SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.502 Additional requirements for engineer endorsements. (a) For all original and raise of grade of engineer...

  9. 46 CFR 11.502 - Additional requirements for engineer endorsements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Additional requirements for engineer endorsements. 11... SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.502 Additional requirements for engineer endorsements. (a) For all original and raise of grade of engineer...

  10. 40 CFR 141.154 - Required additional health information.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Required additional health information... Required additional health information. (a) All reports must prominently display the following language... from their health care providers. EPA/CDC guidelines on appropriate means to lessen the risk of...

  11. 40 CFR 141.154 - Required additional health information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Required additional health information... Required additional health information. (a) All reports must prominently display the following language... from their health care providers. EPA/CDC guidelines on appropriate means to lessen the risk of...

  12. 40 CFR 141.154 - Required additional health information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Required additional health information... Required additional health information. (a) All reports must prominently display the following language... from their health care providers. EPA/CDC guidelines on appropriate means to lessen the risk of...

  13. 40 CFR 141.154 - Required additional health information.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Required additional health information... Required additional health information. (a) All reports must prominently display the following language... from their health care providers. EPA/CDC guidelines on appropriate means to lessen the risk of...

  14. 46 CFR 15.525 - Additional manning requirements for tank vessels.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Additional manning requirements for tank vessels. 15.525... MANNING REQUIREMENTS Manning Requirements; Inspected Vessels § 15.525 Additional manning requirements for tank vessels. Parts 31 and 35 of this chapter contain additional manning requirements applicable to...

  15. Is shade for horses a comfort resource or a minimum requirement?

    PubMed

    Holcomb, K E

    2017-09-01

    Shade or shelter as protection from extremes of weather is required for horses at agricultural research and teaching facilities and is recommended or required by many states, professional organizations, and industry groups. The focus of this paper is the recent research on the responses of horses to hot, sunny weather, which has begun to provide scientific evidence that characterizes how and when shade is used and any benefits shade confers on horses. These behavioral and physiological findings support provision of shade as a resource for thermal comfort and the expression of normal behavior that should be included as a standard of best care practices for healthy adult horses living in the environmental conditions reviewed, rather than an absolute minimum care requirement. Additional research is required for horses living under other environmental conditions, for very young or old horses, horses in very poor body condition, or those with compromised health to determine if their responses to hot, sunny weather differ from those presented here.

  16. 33 CFR 104.295 - Additional requirements-cruise ships.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Additional requirements-cruise ships. 104.295 Section 104.295 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARITIME SECURITY: VESSELS Vessel Security Requirements § 104.295 Additional requirements—cruise ships. (a) At all MARSEC...

  17. 40 CFR 63.504 - Additional requirements for performance testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Additional requirements for performance... Additional requirements for performance testing. (a) Performance testing shall be conducted in accordance.... Sections 63.484 through 63.501 also contain specific testing requirements. (1) Performance tests shall be...

  18. 14 CFR § 1274.937 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... information technology resources. § 1274.937 Section § 1274.937 Aeronautics and Space NATIONAL AERONAUTICS... Conditions § 1274.937 Security requirements for unclassified information technology resources. Security Requirements for Unclassified Information Technology Resources July 2002 (a) The Recipient shall be responsible...

  19. 49 CFR 172.203 - Additional description requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.203 Additional description requirements. (a) Special permits. Except as provided in § 173.23 of this subchapter, each shipping paper issued in... to which the special permit applies. Each shipping paper issued in connection with a shipment made...

  20. 49 CFR 172.203 - Additional description requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.203 Additional description requirements. (a) Special permits. Except as provided in § 173.23 of this subchapter, each shipping paper issued in... to which the special permit applies. Each shipping paper issued in connection with a shipment made...

  1. 49 CFR 172.203 - Additional description requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.203 Additional description requirements. (a) Special permits. Except as provided in § 173.23 of this subchapter, each shipping paper issued in... to which the special permit applies. Each shipping paper issued in connection with a shipment made...

  2. 49 CFR 172.203 - Additional description requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.203 Additional description requirements. (a) Special permits. Except as provided in § 173.23 of this subchapter, each shipping paper issued in... to which the special permit applies. Each shipping paper issued in connection with a shipment made...

  3. Functional Requirements for Information Resource Provenance on the Web

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCusker, James P.; Lebo, Timothy; Graves, Alvaro

    We provide a means to formally explain the relationship between HTTP URLs and the representations returned when they are requested. According to existing World Wide Web architecture, the URL serves as an identier for a semiotic referent while the document returned via HTTP serves as a representation of the same referent. This begins with two sides of a semiotic triangle; the third side is the relationship between the URL and the representation received. We complete this description by extending the library science resource model Functional Requirements for Bibliographic Resources (FRBR) with cryptographic message and content digests to create a Functionalmore » Requirements for Information Resources (FRIR). We show how applying the FRIR model to HTTP GET and POST transactions disambiguates the many relationships between a given URL and all representations received from its request, provides fine-grained explanations that are complementary to existing explanations of web resources, and integrates easily into the emerging W3C provenance standard.« less

  4. 15 CFR 292.6 - Additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Additional requirements. 292.6 Section 292.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST EXTRAMURAL PROGRAMS MANUFACTURING EXTENSION...

  5. 15 CFR 292.6 - Additional requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 1 2012-01-01 2012-01-01 false Additional requirements. 292.6 Section 292.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST EXTRAMURAL PROGRAMS MANUFACTURING EXTENSION...

  6. 15 CFR 292.6 - Additional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Additional requirements. 292.6 Section 292.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST EXTRAMURAL PROGRAMS MANUFACTURING EXTENSION...

  7. 15 CFR 292.6 - Additional requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Additional requirements. 292.6 Section 292.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST EXTRAMURAL PROGRAMS MANUFACTURING EXTENSION...

  8. 15 CFR 292.6 - Additional requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Additional requirements. 292.6 Section 292.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST EXTRAMURAL PROGRAMS MANUFACTURING EXTENSION...

  9. 33 CFR 154.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Additional response plan... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Additional... Prince William Sound, Alaska § 154.1125 Additional response plan requirements. (a) The owner or operator...

  10. 27 CFR 18.27 - Additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Additional requirements. 18.27 Section 18.27 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS PRODUCTION OF VOLATILE FRUIT-FLAVOR CONCENTRATE Qualification Application...

  11. 27 CFR 18.27 - Additional requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2011-04-01 2011-04-01 false Additional requirements. 18.27 Section 18.27 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS PRODUCTION OF VOLATILE FRUIT-FLAVOR CONCENTRATE Qualification Application...

  12. 27 CFR 18.27 - Additional requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2013-04-01 2013-04-01 false Additional requirements. 18.27 Section 18.27 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY ALCOHOL PRODUCTION OF VOLATILE FRUIT-FLAVOR CONCENTRATE Qualification Application...

  13. 27 CFR 18.27 - Additional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2014-04-01 2014-04-01 false Additional requirements. 18.27 Section 18.27 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY ALCOHOL PRODUCTION OF VOLATILE FRUIT-FLAVOR CONCENTRATE Qualification Application...

  14. 27 CFR 18.27 - Additional requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2012-04-01 2012-04-01 false Additional requirements. 18.27 Section 18.27 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS PRODUCTION OF VOLATILE FRUIT-FLAVOR CONCENTRATE Qualification Application...

  15. 15 CFR 970.519 - Resource conservation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... prevention of waste and the future opportunity for the commercial recovery of the unrecovered balance of the... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Resource conservation requirements. 970.519 Section 970.519 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade...

  16. 15 CFR 970.519 - Resource conservation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... prevention of waste and the future opportunity for the commercial recovery of the unrecovered balance of the... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Resource conservation requirements. 970.519 Section 970.519 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade...

  17. Resource requirements of the Pacific leatherback turtle population.

    PubMed

    Jones, T Todd; Bostrom, Brian L; Hastings, Mervin D; Van Houtan, Kyle S; Pauly, Daniel; Jones, David R

    2012-01-01

    The Pacific population of leatherback sea turtles (Dermochelys coriacea) has drastically declined in the last 25 years. This decline has been linked to incidental capture by fisheries, egg and meat harvesting, and recently, to climate variability and resource limitation. Here we couple growth rates with feeding experiments and food intake functions to estimate daily energy requirements of leatherbacks throughout their development. We then estimate mortality rates from available data, enabling us to raise food intake (energy requirements) of the individual to the population level. We place energy requirements in context of available resources (i.e., gelatinous zooplankton abundance). Estimated consumption rates suggest that a single leatherback will eat upward of 1000 metric tonnes (t) of jellyfish in its lifetime (range 924-1112) with the Pacific population consuming 2.1×10(6) t of jellyfish annually (range 1.0-3.7×10(6)) equivalent to 4.2×10(8) megajoules (MJ) (range 2.0-7.4×10(8)). Model estimates suggest 2-7 yr-old juveniles comprise the majority of the Pacific leatherback population biomass and account for most of the jellyfish consumption (1.1×10(6) t of jellyfish or 2.2×10(8) MJ per year). Leatherbacks are large gelatinous zooplanktivores with consumption to biomass ratios of 96 (up to 192 if feeding strictly on low energy density Cnidarians); they, therefore, have a large capacity to impact gelatinous zooplankton landscapes. Understanding the leatherback's needs for gelatinous zooplankton, versus the availability of these resources, can help us better assess population trends and the influence of climate induced resource limitations to reproductive output.

  18. Resource Requirements of the Pacific Leatherback Turtle Population

    PubMed Central

    Jones, T. Todd; Bostrom, Brian L.; Hastings, Mervin D.; Van Houtan, Kyle S.; Pauly, Daniel; Jones, David R.

    2012-01-01

    The Pacific population of leatherback sea turtles (Dermochelys coriacea) has drastically declined in the last 25 years. This decline has been linked to incidental capture by fisheries, egg and meat harvesting, and recently, to climate variability and resource limitation. Here we couple growth rates with feeding experiments and food intake functions to estimate daily energy requirements of leatherbacks throughout their development. We then estimate mortality rates from available data, enabling us to raise food intake (energy requirements) of the individual to the population level. We place energy requirements in context of available resources (i.e., gelatinous zooplankton abundance). Estimated consumption rates suggest that a single leatherback will eat upward of 1000 metric tonnes (t) of jellyfish in its lifetime (range 924–1112) with the Pacific population consuming 2.1×106 t of jellyfish annually (range 1.0–3.7×106) equivalent to 4.2×108 megajoules (MJ) (range 2.0–7.4×108). Model estimates suggest 2–7 yr-old juveniles comprise the majority of the Pacific leatherback population biomass and account for most of the jellyfish consumption (1.1×106 t of jellyfish or 2.2×108 MJ per year). Leatherbacks are large gelatinous zooplanktivores with consumption to biomass ratios of 96 (up to 192 if feeding strictly on low energy density Cnidarians); they, therefore, have a large capacity to impact gelatinous zooplankton landscapes. Understanding the leatherback's needs for gelatinous zooplankton, versus the availability of these resources, can help us better assess population trends and the influence of climate induced resource limitations to reproductive output. PMID:23071518

  19. 33 CFR 105.290 - Additional requirements-cruise ship terminals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Additional requirements-cruise ship terminals. 105.290 Section 105.290 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARITIME SECURITY: FACILITIES Facility Security Requirements § 105.290 Additional requirements—cruise ship terminals...

  20. 29 CFR 1926.1421 - Signals-voice signals-additional requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Signals-voice signals-additional requirements. 1926.1421... Derricks in Construction § 1926.1421 Signals—voice signals—additional requirements. (a) Prior to beginning operations, the operator, signal person and lift director (if there is one), must contact each other and...

  1. 29 CFR 1926.1421 - Signals-voice signals-additional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Signals-voice signals-additional requirements. 1926.1421... Derricks in Construction § 1926.1421 Signals—voice signals—additional requirements. (a) Prior to beginning operations, the operator, signal person and lift director (if there is one), must contact each other and...

  2. 29 CFR 1926.1421 - Signals-voice signals-additional requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Signals-voice signals-additional requirements. 1926.1421... Derricks in Construction § 1926.1421 Signals—voice signals—additional requirements. (a) Prior to beginning operations, the operator, signal person and lift director (if there is one), must contact each other and...

  3. Science requirements for free-flying imaging radar (FIREX) experiment for sea ice, renewable resources, nonrenewable resources and oceanography

    NASA Technical Reports Server (NTRS)

    Carsey, F.

    1982-01-01

    A future bilateral SAR program was studied. The requirements supporting a SAR mission posed by science and operations in sea-ice-covered waters, oceanography, renewable resources, and nonrenewable resources are addressed. The instrument, mission, and program parameters were discussed. Research investigations supporting a SAR flight and the subsequent overall mission requirements and tradeoffs are summarized.

  4. 10 CFR 70.74 - Additional reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Additional Requirements for Certain Licensees Authorized To Possess a Critical Mass of Special Nuclear... subpart is complete. (5) Each licensee shall provide reasonable assurance that reliable communication with...

  5. 40 CFR 503.5 - Additional or more stringent requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements. 503.5 Section 503.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SEWAGE SLUDGE STANDARDS FOR THE USE OR DISPOSAL OF SEWAGE SLUDGE General Provisions § 503.5 Additional or more... the use or disposal of sewage sludge in addition to or more stringent than the requirements in this...

  6. 42 CFR 436.843 - Medically needy resource standard: State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Resource Standard... resource standard for the covered medically needy groups. [58 FR 4938, Jan. 19, 1993] Determining...

  7. 42 CFR 436.840 - Medically needy resource standard: General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Resource Standard... eligibility under the cash assistance programs that are related to the State's covered medically needy group or groups of individuals under § 436.301. (b) The resource standard established under paragraph (a...

  8. 40 CFR 161.75 - Requirements for additional data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Requirements for additional data. 161.75 Section 161.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR REGISTRATION OF ANTIMICROBIAL PESTICIDES General Provisions § 161.75...

  9. 46 CFR 199.07 - Additional equipment and requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Additional equipment and requirements. 199.07 Section 199.07 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LIFESAVING APPLIANCES AND ARRANGEMENTS LIFESAVING SYSTEMS FOR CERTAIN INSPECTED VESSELS General § 199.07 Additional equipment and...

  10. Natural resource protection on buffer lands: integrating resource evaluation and economics.

    PubMed

    Burger, Joanna; Gochfeld, Michael; Greenberg, Michael

    2008-07-01

    Environmental managers are faced with the wise management, sustainability, and stewardship of their land for natural resource values. This task requires the integration of ecological evaluation with economics. Using the Department of Energy (DOE) as a case study, we examine the why, who, what, where, when, and how questions about assessment and natural resource protection of buffer lands. We suggest that managers evaluate natural resources for a variety of reasons that revolve around land use, remediation/restoration, protection of natural environments, and natural resource damage assessment (NRDA). While DOE is the manager of its lands, and thus its natural resources, a range of natural resource trustees and public officials have co-responsibility. We distinguish four types of natural resource evaluations: (1) the resources themselves (to the ecosystem), (2) the value of specific resources to people (e.g. hunting/fishing/bird-watching/herbal medicines), (3) the value of ecological resources to services for communities (e.g. clean air/water), and (4) the value of the intact ecosystems (e.g. forests or estuaries). Resource evaluations should occur initially to provide information about the status of those resources, and continued evaluation is required to provide trends data. Additional natural resource evaluation is required before, during and immediately following changes in land use, and remediation or restoration. Afterwards, additional monitoring and evaluations are required to evaluate the effects of the land use change or the efficacy of remediation/restoration. There are a wide range of economic methods available to evaluate natural resources, but the methods chosen depend upon the nature of the resource being evaluated, the purpose of the evaluation, and the needs of the agencies, natural resource trustees, public officials, and the public. We discuss the uses, and the advantages and disadvantages of different evaluation methods for natural resources.

  11. Natural resource protection on buffer lands: integrating resource evaluation and economics

    PubMed Central

    Gochfeld, Michael; Greenberg, Michael

    2014-01-01

    Environmental managers are faced with the wise management, sustainability, and stewardship of their land for natural resource values. This task requires the integration of ecological evaluation with economics. Using the Department of Energy (DOE) as a case study, we examine the why, who, what, where, when, and how questions about assessment and natural resource protection of buffer lands. We suggest that managers evaluate natural resources for a variety of reasons that revolve around land use, remediation/restoration, protection of natural environments, and natural resource damage assessment (NRDA). While DOE is the manager of its lands, and thus its natural resources, a range of natural resource trustees and public officials have co-responsibility. We distinguish four types of natural resource evaluations: (1) the resources themselves (to the ecosystem), (2) the value of specific resources to people (e.g. hunting/fishing/bird-watching/herbal medicines), (3) the value of ecological resources to services for communities (e.g. clean air/water), and (4) the value of the intact ecosystems (e.g. forests or estuaries). Resource evaluations should occur initially to provide information about the status of those resources, and continued evaluation is required to provide trends data. Additional natural resource evaluation is required before, during and immediately following changes in land use, and remediation or restoration. Afterwards, additional monitoring and evaluations are required to evaluate the effects of the land use change or the efficacy of remediation/restoration. There are a wide range of economic methods available to evaluate natural resources, but the methods chosen depend upon the nature of the resource being evaluated, the purpose of the evaluation, and the needs of the agencies, natural resource trustees, public officials, and the public. We discuss the uses, and the advantages and disadvantages of different evaluation methods for natural resources. PMID

  12. Optimization-based manufacturing scheduling with multiple resources and setup requirements

    NASA Astrophysics Data System (ADS)

    Chen, Dong; Luh, Peter B.; Thakur, Lakshman S.; Moreno, Jack, Jr.

    1998-10-01

    The increasing demand for on-time delivery and low price forces manufacturer to seek effective schedules to improve coordination of multiple resources and to reduce product internal costs associated with labor, setup and inventory. This study describes the design and implementation of a scheduling system for J. M. Product Inc. whose manufacturing is characterized by the need to simultaneously consider machines and operators while an operator may attend several operations at the same time, and the presence of machines requiring significant setup times. The scheduling problem with these characteristics are typical for many manufacturers, very difficult to be handled, and have not been adequately addressed in the literature. In this study, both machine and operators are modeled as resources with finite capacities to obtain efficient coordination between them, and an operator's time can be shared by several operations at the same time to make full use of the operator. Setups are explicitly modeled following our previous work, with additional penalties on excessive setups to reduce setup costs and avoid possible scraps. An integer formulation with a separable structure is developed to maximize on-time delivery of products, low inventory and small number of setups. Within the Lagrangian relaxation framework, the problem is decomposed into individual subproblems that are effectively solved by using dynamic programming with additional penalties embedded in state transitions. Heuristics is then developed to obtain a feasible schedule following on our previous work with new mechanism to satisfy operator capacity constraints. The method has been implemented using the object-oriented programming language C++ with a user-friendly interface, and numerical testing shows that the method generates high quality schedules in a timely fashion. Through simultaneous consideration of machines and operators, machines and operators are well coordinated to facilitate the smooth flow of

  13. 46 CFR 35.03-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Additional requirements for hybrid work vests. 35.03-25 Section 35.03-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Work Vests § 35.03-25 Additional requirements for hybrid work vests. (a) In addition to the other requirements in...

  14. 46 CFR 35.03-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Additional requirements for hybrid work vests. 35.03-25 Section 35.03-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Work Vests § 35.03-25 Additional requirements for hybrid work vests. (a) In addition to the other requirements in...

  15. 46 CFR 35.03-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Additional requirements for hybrid work vests. 35.03-25 Section 35.03-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Work Vests § 35.03-25 Additional requirements for hybrid work vests. (a) In addition to the other requirements in...

  16. 46 CFR 35.03-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Additional requirements for hybrid work vests. 35.03-25 Section 35.03-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Work Vests § 35.03-25 Additional requirements for hybrid work vests. (a) In addition to the other requirements in...

  17. 46 CFR 35.03-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Additional requirements for hybrid work vests. 35.03-25 Section 35.03-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Work Vests § 35.03-25 Additional requirements for hybrid work vests. (a) In addition to the other requirements in...

  18. 46 CFR 72.01-25 - Additional structural requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONSTRUCTION AND ARRANGEMENT Hull Structure § 72.01-25 Additional structural requirements. (a) Vessels required.... The construction of the bulkheads shall be to the satisfaction of the Commandant. (2) Steps and... deck, such bulkhead or deck shall be made structurally watertight without the use of wood, cement, or...

  19. 14 CFR 136.5 - Additional requirements for Hawaii.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Additional requirements for Hawaii. 136.5 Section 136.5 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... requirements for Hawaii. No person may conduct a commercial air tour in the State of Hawaii unless they comply...

  20. Resource requirements of inclusive urban development in India: insights from ten cities

    NASA Astrophysics Data System (ADS)

    Singh Nagpure, Ajay; Reiner, Mark; Ramaswami, Anu

    2018-02-01

    This paper develops a methodology to assess the resource requirements of inclusive urban development in India and compares those requirements to current community-wide material and energy flows. Methods include: (a) identifying minimum service level benchmarks for the provision of infrastructure services including housing, electricity and clean cooking fuels; (b) assessing the percentage of homes that lack access to infrastructure or that consume infrastructure services below the identified benchmarks; (c) quantifying the material requirements to provide basic infrastructure services using India-specific design data; and (d) computing material and energy requirements for inclusive development and comparing it with current community-wide material and energy flows. Applying the method to ten Indian cities, we find that: 1%-6% of households do not have electricity, 14%-71% use electricity below the benchmark of 25 kWh capita-month-1 4%-16% lack structurally sound housing; 50%-75% live in floor area less than the benchmark of 8.75 m2 floor area/capita; 10%-65% lack clean cooking fuel; and 6%-60% lack connection to a sewerage system. Across the ten cities examined, to provide basic electricity (25 kWh capita-month-1) to all will require an addition of only 1%-10% in current community-wide electricity use. To provide basic clean LPG fuel (1.2 kg capita-month-1) to all requires an increase of 5%-40% in current community-wide LPG use. Providing permanent shelter (implemented over a ten year period) to populations living in non-permanent housing in Delhi and Chandigarh would require a 6%-14% increase over current annual community-wide cement use. Conversely, to provide permanent housing to all people living in structurally unsound housing and those living in overcrowded housing (<5 m cap-2) would require 32%-115% of current community-wide cement flows. Except for the last scenario, these results suggest that social policies that seek to provide basic

  1. 48 CFR 352.239-72 - Security requirements for Federal information technology resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Federal information technology resources. 352.239-72 Section 352.239-72 Federal Acquisition Regulations... Provisions and Clauses 352.239-72 Security requirements for Federal information technology resources. As... Federal Information Technology Resources (January 2010) (a) Applicability. This clause applies whether the...

  2. 49 CFR 236.1007 - Additional requirements for high-speed service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Additional requirements for high-speed service. 236.1007 Section 236.1007 Transportation Other Regulations Relating to Transportation (Continued..., AND APPLIANCES Positive Train Control Systems § 236.1007 Additional requirements for high-speed...

  3. 48 CFR 873.109 - General requirements for acquisition of health-care resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... acquisition of health-care resources. 873.109 Section 873.109 Federal Acquisition Regulations System... HEALTH-CARE RESOURCES 873.109 General requirements for acquisition of health-care resources. (a) Source selection authority. Contracting officers shall be the source selection authority for acquisitions of health...

  4. 48 CFR 873.109 - General requirements for acquisition of health-care resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... acquisition of health-care resources. 873.109 Section 873.109 Federal Acquisition Regulations System... HEALTH-CARE RESOURCES 873.109 General requirements for acquisition of health-care resources. (a) Source selection authority. Contracting officers shall be the source selection authority for acquisitions of health...

  5. 48 CFR 1852.204-76 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... unclassified information technology resources. 1852.204-76 Section 1852.204-76 Federal Acquisition Regulations... information technology resources. As prescribed in 1804.470-4(a), insert the following clause: SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (MONTH YEAR) (a) The contractor shall protect...

  6. 48 CFR 652.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Unclassified Information Technology Resources. 652.239-71 Section 652.239-71 Federal Acquisition Regulations... Provisions and Clauses 652.239-71 Security Requirements for Unclassified Information Technology Resources. As... Technology Resources (SEP 2007) (a) General. The Contractor shall be responsible for information technology...

  7. 48 CFR 652.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Unclassified Information Technology Resources. 652.239-71 Section 652.239-71 Federal Acquisition Regulations... Provisions and Clauses 652.239-71 Security Requirements for Unclassified Information Technology Resources. As... Technology Resources (SEP 2007) (a) General. The Contractor shall be responsible for information technology...

  8. 48 CFR 652.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Unclassified Information Technology Resources. 652.239-71 Section 652.239-71 Federal Acquisition Regulations... Provisions and Clauses 652.239-71 Security Requirements for Unclassified Information Technology Resources. As... Technology Resources (SEP 2007) (a) General. The Contractor shall be responsible for information technology...

  9. 48 CFR 652.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Unclassified Information Technology Resources. 652.239-71 Section 652.239-71 Federal Acquisition Regulations... Provisions and Clauses 652.239-71 Security Requirements for Unclassified Information Technology Resources. As... Technology Resources (SEP 2007) (a) General. The Contractor shall be responsible for information technology...

  10. 48 CFR 1852.204-76 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... unclassified information technology resources. 1852.204-76 Section 1852.204-76 Federal Acquisition Regulations... information technology resources. As prescribed in 1804.470-4(a), insert the following clause: Security Requirements for Unclassified Information Technology Resources (MONTH YEAR) (a) The contractor shall protect...

  11. 48 CFR 1852.204-76 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... unclassified information technology resources. 1852.204-76 Section 1852.204-76 Federal Acquisition Regulations... information technology resources. As prescribed in 1804.470-4(a), insert the following clause: Security Requirements for Unclassified Information Technology Resources (MONTH YEAR) (a) The contractor shall protect...

  12. 48 CFR 1852.204-76 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... unclassified information technology resources. 1852.204-76 Section 1852.204-76 Federal Acquisition Regulations... information technology resources. As prescribed in 1804.470-4(a), insert the following clause: Security Requirements for Unclassified Information Technology Resources (MONTH YEAR) (a) The contractor shall protect...

  13. 48 CFR 652.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Unclassified Information Technology Resources. 652.239-71 Section 652.239-71 Federal Acquisition Regulations... Provisions and Clauses 652.239-71 Security Requirements for Unclassified Information Technology Resources. As... Technology Resources (SEP 2007) (a) General. The Contractor shall be responsible for information technology...

  14. Estimating the required logistical resources to support the development of a sustainable corn stover bioeconomy in the USA

    DOE PAGES

    Ebadian, Mahmood; Sokhansanj, Shahabaddine; Webb, Erin

    2016-11-23

    In this paper, the logistical resources required to develop a bioeconomy based on corn stover in the USA are quantified, including field equipment, storage sites, transportation and handling equipment, workforce, corn growers, and corn lands. These resources are essential to mobilize large quantities of corn stover from corn fields to biorefineries. The logistical resources are estimated over the lifetime of the biorefineries. Seventeen corn-growing states are considered for the logistical resource assessment. Over 6.8 billion gallons of cellulosic ethanol can be produced annually from 108 million dry tons of corn stover in these states. The maximum number of required fieldmore » equipment (i.e., choppers, balers, collectors, loaders, and tractors) is estimated to be 194 110 units with a total economic value of about 26 billion dollars. In addition, 40 780 trucks and flatbed trailers would be required to transport bales from corn fields and storage sites to biorefineries with a total economic value of 4.0 billion dollars. About 88 899 corn growers need to be contracted with an annual net income of over 2.1 billion dollars. About 1903 storage sites would be required to hold 53.1 million dry tons of inventory after the harvest season. These storage sites would take up about 35 320.2 acres and 4077 loaders with an economic value of 0.4 billion dollars would handle this inventory. The total required workforce to run the logistics operations is estimated to be 50 567. Furthermore, the magnitude of the estimated logistical resources demonstrates the economic and social significance of the corn stover bioeconomy in rural areas in the USA.« less

  15. Estimating the required logistical resources to support the development of a sustainable corn stover bioeconomy in the USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ebadian, Mahmood; Sokhansanj, Shahabaddine; Webb, Erin

    In this paper, the logistical resources required to develop a bioeconomy based on corn stover in the USA are quantified, including field equipment, storage sites, transportation and handling equipment, workforce, corn growers, and corn lands. These resources are essential to mobilize large quantities of corn stover from corn fields to biorefineries. The logistical resources are estimated over the lifetime of the biorefineries. Seventeen corn-growing states are considered for the logistical resource assessment. Over 6.8 billion gallons of cellulosic ethanol can be produced annually from 108 million dry tons of corn stover in these states. The maximum number of required fieldmore » equipment (i.e., choppers, balers, collectors, loaders, and tractors) is estimated to be 194 110 units with a total economic value of about 26 billion dollars. In addition, 40 780 trucks and flatbed trailers would be required to transport bales from corn fields and storage sites to biorefineries with a total economic value of 4.0 billion dollars. About 88 899 corn growers need to be contracted with an annual net income of over 2.1 billion dollars. About 1903 storage sites would be required to hold 53.1 million dry tons of inventory after the harvest season. These storage sites would take up about 35 320.2 acres and 4077 loaders with an economic value of 0.4 billion dollars would handle this inventory. The total required workforce to run the logistics operations is estimated to be 50 567. Furthermore, the magnitude of the estimated logistical resources demonstrates the economic and social significance of the corn stover bioeconomy in rural areas in the USA.« less

  16. Regulation of Fuel and Fuel Additives: Refiner and Importer Quality Assurance Requirements for Downstream Oxygenate Blending and Requirements for Disposition of Pipeline Interfaces Additional Resources

    EPA Pesticide Factsheets

    EPA has published a Direct Final Rule that addresses requirements for parties that handle pipeline interface as well as addresses downstream quality assurance requirements for refiners (EPA publication # EPA-420-F-06-039).

  17. Force Reduction Impacts on Resourcing Army Operational Requirements

    DTIC Science & Technology

    2017-03-10

    scenarios involving parametric changes to demand for and supply of manpower and equipment from the institutional Army. This type of mission- based ...i SPECIAL REPORT Force Reduction Impacts on Resourcing Army Operational Requirements By Dynamics Research Corporation In Partial... Research .................................................................................................. 12 2.1.2 Identifying and Collecting Unit

  18. 49 CFR 236.1007 - Additional requirements for high-speed service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Additional requirements for high-speed service..., AND APPLIANCES Positive Train Control Systems § 236.1007 Additional requirements for high-speed... by this subpart, and which have been utilized on high-speed rail systems with similar technical and...

  19. Additive effect of calcium depletion and low resource quality on Gammarus fossarum (Crustacea, Amphipoda) life history traits.

    PubMed

    Rollin, Marc; Coulaud, Romain; Danger, Michael; Sohm, Bénédicte; Flayac, Justine; Bec, Alexandre; Chaumot, Arnaud; Geffard, Olivier; Felten, Vincent

    2018-04-01

    Gammarus fossarum is an often-abundant crustacean detritivore that contributes importantly to leaf litter breakdown in oligotrophic, mainly heterotrophic, headwater streams. This species requires large amounts of Ca to moult, thus allowing growth and reproduction. Because resource quality is tightly coupled to the organism's growth and physiological status, we hypothesised that low Ca concentration [Ca] and low food resource quality (low phosphorus [P] and/or reduced highly unsaturated fatty acid [HUFA] contents) would interactively impair molecular responses (gene expression) and reproduction of G. fossarum. To investigate the effects of food resources quality, we experimentally manipulated the P content of sycamore leaves and also used diatoms because they contain high amounts of HUFAs. Three resource quality treatments were tested: low quality (LQ, unmanipulated leaves: low P content), high quality 1 (HQ1; P-manipulated leaves: high P content), and high quality 2 (unmanipulated leaves supplemented with a pellet containing diatoms: high P and HUFA content). Naturally, demineralised stream water was supplemented with CaSO 4 to obtain three Ca concentrations (2, 3.5, and 10.5 mg Ca L -1 ). For 21 days, pairs of G. fossarum were individually exposed to one of the nine treatments (3 [Ca] × 3 resource qualities). At the individual level, strong and significant delays in moult stage were observed in gammarids exposed to lower [Ca] and to lower resource quality, with additive effects lengthening the duration of the reproductive cycle. Effects at the molecular level were investigated by measuring expression of 12 genes involved in energy production, translation, or Ca or P homeostasis. Expression of ATP synthase beta (higher in HQ2), calcified cuticle protein (higher in HQ1 and HQ2), and tropomyosin (higher in HQ2 compared to HQ1) was significantly affected by resource quality, and significant additive effects on Ca transporting ATPase expression were induced by

  20. FIREX mission requirements document for renewable resources

    NASA Technical Reports Server (NTRS)

    Carsey, F.; Dixon, T.

    1982-01-01

    The initial experimental program and mission requirements for a satellite synthetic aperture radar (SAR) system FIREX (Free-Flying Imaging Radar Experiment) for renewable resources is described. The spacecraft SAR is a C-band and L-band VV polarized system operating at two angles of incidence which is designated as a research instrument for crop identification, crop canopy condition assessments, soil moisture condition estimation, forestry type and condition assessments, snow water equivalent and snow wetness assessments, wetland and coastal land type identification and mapping, flood extent mapping, and assessment of drainage characteristics of watersheds for water resources applications. Specific mission design issues such as the preferred incidence angles for vegetation canopy measurements and the utility of a dual frequency (L and C-band) or dual polarization system as compared to the baseline system are addressed.

  1. 46 CFR 160.027-3 - Additional requirements for life floats.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Additional requirements for life floats. 160.027-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Floats for Merchant Vessels § 160.027-3 Additional requirements for life floats. (a) Each life float must have a platform designed...

  2. 46 CFR 160.027-3 - Additional requirements for life floats.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Additional requirements for life floats. 160.027-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Floats for Merchant Vessels § 160.027-3 Additional requirements for life floats. (a) Each life float must have a platform designed...

  3. 37 CFR 2.23 - Additional requirements for TEAS Plus application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... TEAS Plus application. 2.23 Section 2.23 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND... § 2.23 Additional requirements for TEAS Plus application. (a) In addition to the filing requirements under § 2.22(a), the applicant must: (1) File the following communications through TEAS: (i) Responses...

  4. 46 CFR 160.027-3 - Additional requirements for life floats.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Additional requirements for life floats. 160.027-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Floats for Merchant Vessels § 160.027-3 Additional requirements for life floats. (a) Each life float must have a platform designed...

  5. 46 CFR 160.027-3 - Additional requirements for life floats.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Additional requirements for life floats. 160.027-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Floats for Merchant Vessels § 160.027-3 Additional requirements for life floats. (a) Each life float must have a platform designed...

  6. 46 CFR 160.027-3 - Additional requirements for life floats.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Additional requirements for life floats. 160.027-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Floats for Merchant Vessels § 160.027-3 Additional requirements for life floats. (a) Each life float must have a platform designed...

  7. 37 CFR 2.23 - Additional requirements for TEAS Plus application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TEAS Plus application. 2.23 Section 2.23 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND... § 2.23 Additional requirements for TEAS Plus application. (a) In addition to the filing requirements under § 2.22(a), the applicant must: (1) File the following communications through TEAS: (i) Responses...

  8. 12 CFR 229.18 - Additional disclosure requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... RESERVE SYSTEM AVAILABILITY OF FUNDS AND COLLECTION OF CHECKS (REGULATION CC) Availability of Funds and Disclosure of Funds Availability Policies § 229.18 Additional disclosure requirements. (a) Deposit slips. A... consumer accounts a notice that sets forth the time periods applicable to the availability of funds...

  9. 12 CFR 229.18 - Additional disclosure requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RESERVE SYSTEM AVAILABILITY OF FUNDS AND COLLECTION OF CHECKS (REGULATION CC) Availability of Funds and Disclosure of Funds Availability Policies § 229.18 Additional disclosure requirements. (a) Deposit slips. A... consumer accounts a notice that sets forth the time periods applicable to the availability of funds...

  10. 25 CFR 161.200 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... resource management plan required? (a) Yes, Navajo Partitioned Lands must be managed in accordance with the goals and objectives in the agricultural resource management plan developed by the Navajo Nation, or by...

  11. Mineral resources of the Whipple Mountains and Whipple Mountains Addition Wilderness Study Areas, San Bernardino County, California

    USGS Publications Warehouse

    Marsh, Sherman P.; Raines, Gary L.; Diggles, Michael F.; Howard, Keith A.; Simpson, Robert W.; Hoover, Donald B.; Ridenour, James; Moyle, Phillip R.; Willett, Spencee L.

    1988-01-01

    At the request of the U.S. Bureau of Land Management, approximately 85,100 acres of the Whipple Mountains Wilderness Study Area (CDCA-312) and 1,380 acres of the Whipple Mountains Addition Wilderness Study Area (AZ-050-010) were evaluated for identified mineral resources (known) and mineral resource potential (undiscovered). In this report, the Whipple Mountains and Whipple Mountains Addition Wilderness Study Areas are referred to as simply "the study area." Most of the mines and prospects with identified resources in the Whipple Mountains Wilderness Study Area are within areas designated as having mineral resource potential. The area in and around the Turk Silver mine and the Lucky Green group and the area near the northwest boundary of the study area have high mineral resource potential for copper, lead, zinc, gold, and silver. An area along the west boundary of the study area has moderate resource potential for copper lead, zinc, gold, and silver. An area in the east adjacent to the Whipple Mountains Addition Wilderness Study Area has moderate resource potential for copper, gold, and silver resources. One area on the north boundary and one on the southeast boundary of the study area have low mineral resource potential for copper, lead, zinc, gold, and silver. Two areas, one on the north boundary and one inside the east boundary of the study area, have moderate resource potential for manganese. A small area inside the south boundary of the study area has high resource potential for decorative building stone, and the entire study area has low resource potential for sand and gravel and other rock products suitable for construction. Two areas in the eastern part of the study area have low resource potential for uranium. There is no resource potential for oil and gas or geothermal resources in the Whipple Mountains Wilderness Study Area. Sites within the Whipple Mountains Wilderness Study Area with identified resources of copper, gold, silver, manganese and (or

  12. 24 CFR 235.1218 - Additional eligibility requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...; Direct Endorsement § 235.1218 Additional eligibility requirements. (a) Mortgage amount. It must be in an... par on one of the following dates, whichever rate is higher: (i) The date the Direct Endorsement mortgagee's underwriter signs the Mortgage Credit Analysis Worksheet (form HUD-92900 WS); or (ii) The date...

  13. 48 CFR 1352.271-72 - Additional Item Requirements (AIR)-growth work

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Requirements (AIR)-growth work 1352.271-72 Section 1352.271-72 Federal Acquisition Regulations System... Clauses 1352.271-72 Additional Item Requirements (AIR)—growth work As prescribed in 48 CFR 1371.103, insert the following clause: Additional Item Requirements (Air)—Growth Work (APR 2010) (a) This clause...

  14. Satellite Power System (SPS) resource requirements (critical materials, energy, and land)

    NASA Technical Reports Server (NTRS)

    Kotin, A. D.

    1978-01-01

    The resource impacts of the proposed satellite power system (SPS) were reviewed. Three classes of resource impacts were considered separately: critical materials, energy and land use. The analysis focused on the requirements associated with the annual development of two five-gigawatt satellites and the associated receiving facilities.

  15. Satellite Power System (SPS) resource requirements (critical materials, energy and land)

    NASA Technical Reports Server (NTRS)

    Kotin, A. D.

    1978-01-01

    The resource impacts of the proposed satellite power system are evaluated. Three classes of resource impacts are considered separately: critical materials, energy, and land use. The analysis focuses on the requirements associated with the annual development of two five-gigawatt satellites and the associated receiving facilities.

  16. 46 CFR 196.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Additional requirements for hybrid work vests. 196.34-25 Section 196.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Work Vests § 196.34-25 Additional requirements for hybrid work vests. (a) In addition...

  17. 46 CFR 196.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Additional requirements for hybrid work vests. 196.34-25 Section 196.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Work Vests § 196.34-25 Additional requirements for hybrid work vests. (a) In addition...

  18. 46 CFR 196.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Additional requirements for hybrid work vests. 196.34-25 Section 196.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Work Vests § 196.34-25 Additional requirements for hybrid work vests. (a) In addition...

  19. 46 CFR 196.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Additional requirements for hybrid work vests. 196.34-25 Section 196.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Work Vests § 196.34-25 Additional requirements for hybrid work vests. (a) In addition...

  20. 46 CFR 196.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Additional requirements for hybrid work vests. 196.34-25 Section 196.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Work Vests § 196.34-25 Additional requirements for hybrid work vests. (a) In addition...

  1. 24 CFR 235.1218 - Additional eligibility requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Additional eligibility requirements... interest due and delinquent interest not to exceed two months; and (2) The original principal amount of the... based on the closing price for three-month forward delivery contracts closest to par but not exceeding...

  2. 25 CFR 215.17 - Additional information required.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Additional information required. 215.17 Section 215.17 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS LEAD AND ZINC MINING... application, must file one certified copy of articles of incorporation and, if a foreign corporation, evidence...

  3. 46 CFR 97.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Additional requirements for hybrid work vests. 97.34-25 Section 97.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS OPERATIONS Work Vests § 97.34-25 Additional requirements for hybrid work vests. (a) In addition to...

  4. 46 CFR 97.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Additional requirements for hybrid work vests. 97.34-25 Section 97.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS OPERATIONS Work Vests § 97.34-25 Additional requirements for hybrid work vests. (a) In addition to...

  5. 46 CFR 78.36-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 3 2011-10-01 2011-10-01 false Additional requirements for hybrid work vests. 78.36-25 Section 78.36-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS OPERATIONS Work Vests § 78.36-25 Additional requirements for hybrid work vests. (a) In addition to the other...

  6. 46 CFR 78.36-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Additional requirements for hybrid work vests. 78.36-25 Section 78.36-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS OPERATIONS Work Vests § 78.36-25 Additional requirements for hybrid work vests. (a) In addition to the other...

  7. 46 CFR 97.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Additional requirements for hybrid work vests. 97.34-25 Section 97.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS OPERATIONS Work Vests § 97.34-25 Additional requirements for hybrid work vests. (a) In addition to...

  8. 46 CFR 78.36-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 3 2014-10-01 2014-10-01 false Additional requirements for hybrid work vests. 78.36-25 Section 78.36-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS OPERATIONS Work Vests § 78.36-25 Additional requirements for hybrid work vests. (a) In addition to the other...

  9. 46 CFR 97.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Additional requirements for hybrid work vests. 97.34-25 Section 97.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS OPERATIONS Work Vests § 97.34-25 Additional requirements for hybrid work vests. (a) In addition to...

  10. 46 CFR 78.36-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 3 2013-10-01 2013-10-01 false Additional requirements for hybrid work vests. 78.36-25 Section 78.36-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS OPERATIONS Work Vests § 78.36-25 Additional requirements for hybrid work vests. (a) In addition to the other...

  11. 46 CFR 78.36-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 3 2012-10-01 2012-10-01 false Additional requirements for hybrid work vests. 78.36-25 Section 78.36-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS OPERATIONS Work Vests § 78.36-25 Additional requirements for hybrid work vests. (a) In addition to the other...

  12. 46 CFR 97.34-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Additional requirements for hybrid work vests. 97.34-25 Section 97.34-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS OPERATIONS Work Vests § 97.34-25 Additional requirements for hybrid work vests. (a) In addition to...

  13. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false What are the requirements for a staffing and resource plan... Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For significant matters, the contractor must require retained legal counsel providing legal services to prepare a staffing...

  14. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What are the requirements for a staffing and resource plan... Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For significant matters, the contractor must require retained legal counsel providing legal services to prepare a staffing...

  15. 25 CFR 215.17 - Additional information required.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... interested in lead and zinc mining leases, or land under the jurisdiction of the Quapaw Indian Agency, and... 25 Indians 1 2010-04-01 2010-04-01 false Additional information required. 215.17 Section 215.17 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS LEAD AND ZINC MINING...

  16. 46 CFR 42.09-30 - Additional survey requirements for steel-hull vessels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Additional survey requirements for steel-hull vessels...-30 Additional survey requirements for steel-hull vessels. (a) In addition to the requirements in § 42..., peaks, bilges, machinery spaces, and bunkers shall be examined to determine the condition of the framing...

  17. 46 CFR 42.09-30 - Additional survey requirements for steel-hull vessels.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Additional survey requirements for steel-hull vessels. 42.09-30 Section 42.09-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD...-30 Additional survey requirements for steel-hull vessels. (a) In addition to the requirements in § 42...

  18. 46 CFR 42.09-30 - Additional survey requirements for steel-hull vessels.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Additional survey requirements for steel-hull vessels. 42.09-30 Section 42.09-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD...-30 Additional survey requirements for steel-hull vessels. (a) In addition to the requirements in § 42...

  19. 46 CFR 42.09-30 - Additional survey requirements for steel-hull vessels.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Additional survey requirements for steel-hull vessels. 42.09-30 Section 42.09-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD...-30 Additional survey requirements for steel-hull vessels. (a) In addition to the requirements in § 42...

  20. 46 CFR 42.09-35 - Additional survey requirements for wood-hull vessels.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Additional survey requirements for wood-hull vessels. 42.09-35 Section 42.09-35 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD LINES... Additional survey requirements for wood-hull vessels. (a) In addition to the requirements in § 42.09-25, the...

  1. 46 CFR 42.09-35 - Additional survey requirements for wood-hull vessels.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Additional survey requirements for wood-hull vessels. 42.09-35 Section 42.09-35 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD LINES... Additional survey requirements for wood-hull vessels. (a) In addition to the requirements in § 42.09-25, the...

  2. 46 CFR 42.09-35 - Additional survey requirements for wood-hull vessels.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Additional survey requirements for wood-hull vessels. 42.09-35 Section 42.09-35 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD LINES... Additional survey requirements for wood-hull vessels. (a) In addition to the requirements in § 42.09-25, the...

  3. 46 CFR 42.09-35 - Additional survey requirements for wood-hull vessels.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Additional survey requirements for wood-hull vessels. 42.09-35 Section 42.09-35 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD LINES... Additional survey requirements for wood-hull vessels. (a) In addition to the requirements in § 42.09-25, the...

  4. 46 CFR 42.09-30 - Additional survey requirements for steel-hull vessels.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Additional survey requirements for steel-hull vessels...-30 Additional survey requirements for steel-hull vessels. (a) In addition to the requirements in § 42...) When the vessel is in drydock, the hull plating, etc., shall be examined. (c) The holds, 'tween decks...

  5. 46 CFR 42.09-35 - Additional survey requirements for wood-hull vessels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Additional survey requirements for wood-hull vessels. 42.09-35 Section 42.09-35 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD LINES... Additional survey requirements for wood-hull vessels. (a) In addition to the requirements in § 42.09-25, the...

  6. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  7. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  8. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  9. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  10. 15 CFR 270.204 - Provision of additional resources and services needed by a Team.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... services needed by a Team. 270.204 Section 270.204 Commerce and Foreign Trade Regulations Relating to... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.204 Provision of additional resources and services needed by a Team. The Director will determine the appropriate resources that a Team...

  11. 46 CFR 95.17-25 - Additional protection required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-25 Additional protection required. (a) In order that any residual fires above the floor plates may be extinguished when a foam system is...

  12. 46 CFR 76.17-25 - Additional protection required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-25 Additional protection required. (a) In order that any residual fires above the floor plates may be extinguished when a foam system is installed...

  13. 46 CFR 95.17-25 - Additional protection required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-25 Additional protection required. (a) In order that any residual fires above the floor plates may be extinguished when a foam system is...

  14. 46 CFR 76.17-25 - Additional protection required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-25 Additional protection required. (a) In order that any residual fires above the floor plates may be extinguished when a foam system is installed...

  15. 33 CFR 105.290 - Additional requirements-cruise ship terminals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Additional requirements-cruise ship terminals. 105.290 Section 105.290 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Additional requirements—cruise ship terminals. At all MARSEC Levels, in coordination with a vessel moored at...

  16. 33 CFR 105.290 - Additional requirements-cruise ship terminals.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Additional requirements-cruise ship terminals. 105.290 Section 105.290 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Additional requirements—cruise ship terminals. At all MARSEC Levels, in coordination with a vessel moored at...

  17. 33 CFR 105.290 - Additional requirements-cruise ship terminals.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Additional requirements-cruise ship terminals. 105.290 Section 105.290 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Additional requirements—cruise ship terminals. At all MARSEC Levels, in coordination with a vessel moored at...

  18. 33 CFR 105.290 - Additional requirements-cruise ship terminals.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Additional requirements-cruise ship terminals. 105.290 Section 105.290 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Additional requirements—cruise ship terminals. At all MARSEC Levels, in coordination with a vessel moored at...

  19. 14 CFR 61.31 - Type rating requirements, additional training, and authorization requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... holder is already qualified. (k) Additional training required for night vision goggle operations. (1... aircraft using night vision goggles only if that person receives and logs ground training from an...: (i) Applicable portions of this chapter that relate to night vision goggle limitations and flight...

  20. 14 CFR 61.31 - Type rating requirements, additional training, and authorization requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... holder is already qualified. (k) Additional training required for night vision goggle operations. (1... aircraft using night vision goggles only if that person receives and logs ground training from an...: (i) Applicable portions of this chapter that relate to night vision goggle limitations and flight...

  1. 48 CFR 1252.239-70 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... unclassified information technology resources. 1252.239-70 Section 1252.239-70 Federal Acquisition Regulations... of Provisions and Clauses 1252.239-70 Security requirements for unclassified information technology... Unclassified Information Technology Resources (APR 2005) (a) The Contractor shall be responsible for...

  2. 48 CFR 1252.239-70 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... unclassified information technology resources. 1252.239-70 Section 1252.239-70 Federal Acquisition Regulations... of Provisions and Clauses 1252.239-70 Security requirements for unclassified information technology... Unclassified Information Technology Resources (APR 2005) (a) The Contractor shall be responsible for...

  3. 48 CFR 1252.239-70 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... unclassified information technology resources. 1252.239-70 Section 1252.239-70 Federal Acquisition Regulations... of Provisions and Clauses 1252.239-70 Security requirements for unclassified information technology... Unclassified Information Technology Resources (APR 2005) (a) The Contractor shall be responsible for...

  4. 48 CFR 1252.239-70 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... unclassified information technology resources. 1252.239-70 Section 1252.239-70 Federal Acquisition Regulations... of Provisions and Clauses 1252.239-70 Security requirements for unclassified information technology... Unclassified Information Technology Resources (APR 2005) (a) The Contractor shall be responsible for...

  5. 48 CFR 1252.239-70 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... unclassified information technology resources. 1252.239-70 Section 1252.239-70 Federal Acquisition Regulations... of Provisions and Clauses 1252.239-70 Security requirements for unclassified information technology... Unclassified Information Technology Resources (APR 2005) (a) The Contractor shall be responsible for...

  6. 45 CFR 162.925 - Additional requirements for health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Additional requirements for health plans. 162.925 Section 162.925 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND... requirements for health plans. (a) General rules. (1) If an entity requests a health plan to conduct a...

  7. 45 CFR 162.925 - Additional requirements for health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Additional requirements for health plans. 162.925 Section 162.925 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND... requirements for health plans. (a) General rules. (1) If an entity requests a health plan to conduct a...

  8. 45 CFR 162.925 - Additional requirements for health plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clearinghouse to receive, process, or transmit a standard transaction may not charge fees or costs in excess of... RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS General Provisions for Transactions § 162.925 Additional... transaction as a standard transaction, the health plan must do so. (2) A health plan may not delay or reject a...

  9. Nutritional supplementation: the additional costs of managing children infected with HIV in resource-constrained settings.

    PubMed

    Cobb, G; Bland, R M

    2013-01-01

    To explore the financial implications of applying the WHO guidelines for the nutritional management of HIV-infected children in a rural South African HIV programme. WHO guidelines describe Nutritional Care Plans (NCPs) for three categories of HIV-infected children: NCP-A: growing adequately; NCP-B: weight-for-age z-score (WAZ) ≤-2 but no evidence of severe acute malnutrition (SAM), confirmed weight loss/growth curve flattening, or condition with increased nutritional needs (e.g. tuberculosis); NCP-C: SAM. In resource-constrained settings, children requiring NCP-B or NCP-C usually need supplementation to achieve the additional energy recommendation. We estimated the proportion of children initiating antiretroviral treatment (ART) in the Hlabisa HIV Programme who would have been eligible for supplementation in 2010. The cost of supplying 26-weeks supplementation as a proportion of the cost of supplying ART to the same group was calculated. A total of 251 children aged 6 months to 14 years initiated ART. Eighty-eight required 6-month NCP-B, including 41 with a WAZ ≤-2 (no evidence of SAM) and 47 with a WAZ >-2 with co-existent morbidities including tuberculosis. Additionally, 25 children had SAM and required 10-weeks NCP-C followed by 16-weeks NCP-B. Thus, 113 of 251 (45%) children were eligible for nutritional supplementation at an estimated overall cost of $11 136, using 2010 exchange rates. These costs are an estimated additional 11.6% to that of supplying 26-week ART to the 251 children initiated. It is essential to address nutritional needs of HIV-infected children to optimise their health outcomes. Nutritional supplementation should be integral to, and budgeted for, in HIV programmes. © 2012 Blackwell Publishing Ltd.

  10. 48 CFR 552.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Unclassified Information Technology Resources. 552.239-71 Section 552.239-71 Federal Acquisition Regulations... Text of Provisions and Clauses 552.239-71 Security Requirements for Unclassified Information Technology... Information Technology Resources (JAN 2012) (a) General. The Contractor shall be responsible for information...

  11. 48 CFR 552.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Unclassified Information Technology Resources. 552.239-71 Section 552.239-71 Federal Acquisition Regulations... Text of Provisions and Clauses 552.239-71 Security Requirements for Unclassified Information Technology... Information Technology Resources (JAN 2012) (a) General. The Contractor shall be responsible for information...

  12. 48 CFR 3052.204-70 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... unclassified information technology resources. 3052.204-70 Section 3052.204-70 Federal Acquisition Regulations... for unclassified information technology resources. As prescribed in (HSAR) 48 CFR 3004.470-3, insert a clause substantially the same as follows: Security Requirements for Unclassified Information Technology...

  13. 48 CFR 552.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Unclassified Information Technology Resources. 552.239-71 Section 552.239-71 Federal Acquisition Regulations... Text of Provisions and Clauses 552.239-71 Security Requirements for Unclassified Information Technology... Information Technology Resources (JAN 2012) (a) General. The Contractor shall be responsible for information...

  14. 48 CFR 3052.204-70 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... unclassified information technology resources. 3052.204-70 Section 3052.204-70 Federal Acquisition Regulations... for unclassified information technology resources. As prescribed in (HSAR) 48 CFR 3004.470-3, insert a clause substantially the same as follows: Security Requirements for Unclassified Information Technology...

  15. 48 CFR 552.239-71 - Security Requirements for Unclassified Information Technology Resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Unclassified Information Technology Resources. 552.239-71 Section 552.239-71 Federal Acquisition Regulations... Text of Provisions and Clauses 552.239-71 Security Requirements for Unclassified Information Technology... Information Technology Resources (JUN 2011) (a) General. The Contractor shall be responsible for information...

  16. 48 CFR 3052.204-70 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... unclassified information technology resources. 3052.204-70 Section 3052.204-70 Federal Acquisition Regulations... for unclassified information technology resources. As prescribed in (HSAR) 48 CFR 3004.470-3, insert a clause substantially the same as follows: Security Requirements for Unclassified Information Technology...

  17. Earth resources requirements Skylab missions SL-1/SL-2, SL-3, and SL-4. Appendix B: Mission requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Earth resources requirements to be investigated by Skylab missions 1 through 4 are presented tabularly. Areas to be investigated include: (1) agriculture, range, and forestry; (2) geology; (3) continental water resources; (4) ocean investigations; (5) atmospheric investigations; (6) coastal zones, shoals, and bays; (7) remote sensing techniques; and (8) cartography.

  18. Management advisory memorandum on resource requirement planning for operating and maintaining the National Airspace System

    DOT National Transportation Integrated Search

    1997-01-13

    Management Advisory Memorandum on Resource Requirement Planning for Operating and Maintaining the National Airspace System (NAS) in the Federal Aviation Administration (FAA). Evaluates FAA's resource requirement planning system to ensure it accuratel...

  19. 18 CFR 33.10 - Additional information.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... § 33.10 Additional information. The Director of the Office of Energy Market Regulation, or his designee, may, by letter, require the applicant to submit additional information as is needed for analysis of an... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Additional information...

  20. 18 CFR 33.10 - Additional information.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... § 33.10 Additional information. The Director of the Office of Energy Market Regulation, or his designee, may, by letter, require the applicant to submit additional information as is needed for analysis of an... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Additional information...

  1. 18 CFR 33.10 - Additional information.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... § 33.10 Additional information. The Director of the Office of Energy Market Regulation, or his designee, may, by letter, require the applicant to submit additional information as is needed for analysis of an... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Additional information...

  2. Education Requirements for Natural Resource Based Outdoor Recreation Professionals.

    ERIC Educational Resources Information Center

    Elsner, Gary; And Others

    The Office of Personnel Management should designate a new professional series for hiring individuals in outdoor recreational management. A new professional series would help set a standard for professionals with training in both resource management and the social sciences. Recommended educational requirements for the series include: (1) natural…

  3. 25 CFR 166.311 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166.311 Is an Indian agricultural resource management plan required? (a) Indian agricultural land under... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan...

  4. 48 CFR 352.239-72 - Security requirements for Federal information technology resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...' mission. The term “information technology (IT)”, as used in this clause, includes computers, ancillary... Federal information technology resources. 352.239-72 Section 352.239-72 Federal Acquisition Regulations... Provisions and Clauses 352.239-72 Security requirements for Federal information technology resources. As...

  5. 48 CFR 352.239-72 - Security requirements for Federal information technology resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...' mission. The term “information technology (IT)”, as used in this clause, includes computers, ancillary... Federal information technology resources. 352.239-72 Section 352.239-72 Federal Acquisition Regulations... Provisions and Clauses 352.239-72 Security requirements for Federal information technology resources. As...

  6. 48 CFR 352.239-72 - Security requirements for Federal information technology resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...' mission. The term “information technology (IT)”, as used in this clause, includes computers, ancillary... Federal information technology resources. 352.239-72 Section 352.239-72 Federal Acquisition Regulations... Provisions and Clauses 352.239-72 Security requirements for Federal information technology resources. As...

  7. 48 CFR 352.239-72 - Security requirements for Federal information technology resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...' mission. The term “information technology (IT)”, as used in this clause, includes computers, ancillary... Federal information technology resources. 352.239-72 Section 352.239-72 Federal Acquisition Regulations... Provisions and Clauses 352.239-72 Security requirements for Federal information technology resources. As...

  8. 40 CFR 144.85 - Do these additional requirements apply to me?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Do these additional requirements apply to me? 144.85 Section 144.85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Vehicle Waste Disposal Wells § 144.85 Do these additional requirements apply to me? (a) Large-capacity...

  9. 40 CFR 144.85 - Do these additional requirements apply to me?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Do these additional requirements apply to me? 144.85 Section 144.85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Vehicle Waste Disposal Wells § 144.85 Do these additional requirements apply to me? (a) Large-capacity...

  10. 40 CFR 144.85 - Do these additional requirements apply to me?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Do these additional requirements apply to me? 144.85 Section 144.85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... of Class V Injection Wells § 144.85 Do these additional requirements apply to me? (a) Large-Capacity...

  11. 20 CFR 666.110 - May a Governor require additional indicators of performance?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false May a Governor require additional indicators... of Performance § 666.110 May a Governor require additional indicators of performance? Yes, Governors may develop additional indicators of performance for adults, youth and dislocated worker activities...

  12. 20 CFR 666.110 - May a Governor require additional indicators of performance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false May a Governor require additional indicators... of Performance § 666.110 May a Governor require additional indicators of performance? Yes, Governors may develop additional indicators of performance for adults, youth and dislocated worker activities...

  13. 46 CFR 167.43-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Additional requirements for hybrid work vests. 167.43-25 Section 167.43-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Work Vests § 167.43-25 Additional requirements for hybrid work vests. (a) In...

  14. 46 CFR 167.43-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Additional requirements for hybrid work vests. 167.43-25 Section 167.43-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Work Vests § 167.43-25 Additional requirements for hybrid work vests. (a) In...

  15. 46 CFR 167.43-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Additional requirements for hybrid work vests. 167.43-25 Section 167.43-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Work Vests § 167.43-25 Additional requirements for hybrid work vests. (a) In...

  16. 46 CFR 167.43-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Additional requirements for hybrid work vests. 167.43-25 Section 167.43-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Work Vests § 167.43-25 Additional requirements for hybrid work vests. (a) In...

  17. 46 CFR 167.43-25 - Additional requirements for hybrid work vests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Additional requirements for hybrid work vests. 167.43-25 Section 167.43-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Work Vests § 167.43-25 Additional requirements for hybrid work vests. (a) In...

  18. 30 CFR 250.1629 - Additional production and fuel gas system requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (4) Fire- and gas-detection system. (i) Fire (flame, heat, or smoke) sensors shall be installed in all enclosed classified areas. Gas sensors shall be installed in all inadequately ventilated, enclosed... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Additional production and fuel gas system...

  19. 30 CFR 250.1629 - Additional production and fuel gas system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... structure. (4) Fire- and gas-detection system. (i) Fire (flame, heat, or smoke) sensors shall be installed in all enclosed classified areas. Gas sensors shall be installed in all inadequately ventilated... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Additional production and fuel gas system...

  20. 40 CFR 60.4176 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Additional requirements to provide heat... Compliance Times for Coal-Fired Electric Steam Generating Units Monitoring and Reporting § 60.4176 Additional requirements to provide heat input data. The owner or operator of a Hg Budget unit that monitors and reports Hg...

  1. 29 CFR 502.44 - Additional information, if required.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Additional information, if required. 502.44 Section 502.44 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS ENFORCEMENT OF CONTRACTUAL OBLIGATIONS FOR TEMPORARY ALIEN AGRICULTURAL WORKERS ADMITTED UNDER SECTION 218 OF...

  2. 29 CFR 501.44 - Additional information, if required.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Additional information, if required. 501.44 Section 501.44 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS ENFORCEMENT OF CONTRACTUAL OBLIGATIONS FOR TEMPORARY ALIEN AGRICULTURAL WORKERS ADMITTED UNDER SECTION 218 OF...

  3. 33 CFR 154.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Prince William Sound, Alaska § 154.1125 Additional response plan requirements. (a) The owner or operator of a TAPAA facility shall include the following information in the Prince William Sound appendix to... for personnel, including local residents and fishermen, from the following locations in Prince William...

  4. Additional Resources - Naval Oceanography Portal

    Science.gov Websites

    section Advanced Search... Sections Home Time Earth Orientation Astronomy Meteorology Oceanography Ice You , including research and development results. Includes Astronomy and Space, as well as Earth and Ocean Sciences subject categories. Astronomy Resources Union List of Astronomy Serials (ULAS) - Bibliographic

  5. 48 CFR 1804.470 - Security requirements for unclassified information technology (IT) resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Security requirements for unclassified information technology (IT) resources. 1804.470 Section 1804.470 Federal Acquisition Regulations... Classified Information Within Industry 1804.470 Security requirements for unclassified information technology...

  6. 48 CFR 1804.470 - Security requirements for unclassified information technology (IT) resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Security requirements for unclassified information technology (IT) resources. 1804.470 Section 1804.470 Federal Acquisition Regulations... Classified Information Within Industry 1804.470 Security requirements for unclassified information technology...

  7. 48 CFR 1804.470 - Security requirements for unclassified information technology (IT) resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Security requirements for unclassified information technology (IT) resources. 1804.470 Section 1804.470 Federal Acquisition Regulations... Classified Information Within Industry 1804.470 Security requirements for unclassified information technology...

  8. 48 CFR 1804.470 - Security requirements for unclassified information technology (IT) resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Security requirements for unclassified information technology (IT) resources. 1804.470 Section 1804.470 Federal Acquisition Regulations... Classified Information Within Industry 1804.470 Security requirements for unclassified information technology...

  9. 48 CFR 1804.470 - Security requirements for unclassified information technology (IT) resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Security requirements for unclassified information technology (IT) resources. 1804.470 Section 1804.470 Federal Acquisition Regulations... Classified Information Within Industry 1804.470 Security requirements for unclassified information technology...

  10. Design requirements for operational earth resources ground data processing

    NASA Technical Reports Server (NTRS)

    Baldwin, C. J.; Bradford, L. H.; Burnett, E. S.; Hutson, D. E.; Kinsler, B. A.; Kugle, D. R.; Webber, D. S.

    1972-01-01

    Realistic tradeoff data and evaluation techniques were studied that permit conceptual design of operational earth resources ground processing systems. Methodology for determining user requirements that utilize the limited information available from users is presented along with definitions of sensor capabilities projected into the shuttle/station era. A tentative method is presented for synthesizing candidate ground processing concepts.

  11. 25 CFR 304.4 - Standards and additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Standards and additional requirements. 304.4 Section 304.4 Indians INDIAN ARTS AND CRAFTS BOARD, DEPARTMENT OF THE INTERIOR NAVAJO, PUEBLO, AND HOPI SILVER... in compliance with the standards set forth by the Indian Arts and Crafts Board, shall bear the...

  12. Addition of multiple limiting resources reduces grassland diversity

    USDA-ARS?s Scientific Manuscript database

    Niche dimensionality is the most general theoretical explanation for biodiversity: more niches allow for more ecological tradeoffs between species and thus greater opportunities for coexistence. Resource competition theory predicts that removing resource limitations, by increasing resource availabil...

  13. 20 CFR 416.805 - When additional evidence may be required.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false When additional evidence may be required. 416.805 Section 416.805 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL SECURITY INCOME FOR THE AGED, BLIND, AND DISABLED Determination of Age § 416.805 When additional evidence may be...

  14. 34 CFR 379.45 - What are the additional reporting requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY What Conditions Must Be Met by a Grantee? § 379.45 What are the additional reporting requirements? Each grantee must submit the data from its annual evaluation of project operations required under § 379.21(a)(5) no...

  15. 40 CFR 141.624 - Additional requirements for consecutive systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Additional requirements for consecutive systems. 141.624 Section 141.624 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection...

  16. 40 CFR 141.624 - Additional requirements for consecutive systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Additional requirements for consecutive systems. 141.624 Section 141.624 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection...

  17. 40 CFR 141.624 - Additional requirements for consecutive systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Additional requirements for consecutive systems. 141.624 Section 141.624 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection...

  18. 40 CFR 141.624 - Additional requirements for consecutive systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Additional requirements for consecutive systems. 141.624 Section 141.624 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection...

  19. 21 CFR 70.25 - Labeling requirements for color additives (other than hair dyes).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 1 2014-04-01 2014-04-01 false Labeling requirements for color additives (other than hair dyes). 70.25 Section 70.25 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... color additives (other than hair dyes). (a) General labeling requirements. All color additives shall be...

  20. 21 CFR 70.25 - Labeling requirements for color additives (other than hair dyes).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 1 2013-04-01 2013-04-01 false Labeling requirements for color additives (other than hair dyes). 70.25 Section 70.25 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... color additives (other than hair dyes). (a) General labeling requirements. All color additives shall be...

  1. 21 CFR 70.25 - Labeling requirements for color additives (other than hair dyes).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Labeling requirements for color additives (other than hair dyes). 70.25 Section 70.25 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH... color additives (other than hair dyes). (a) General labeling requirements. All color additives shall be...

  2. 40 CFR 80.1613 - Standards and other requirements for gasoline additive manufacturers and blenders.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... gasoline additive manufacturers and blenders. 80.1613 Section 80.1613 Protection of Environment... Gasoline Sulfur § 80.1613 Standards and other requirements for gasoline additive manufacturers and blenders. Gasoline additive manufacturers and blenders must meet the following requirements: (a) Gasoline additive...

  3. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include the...

  4. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include the...

  5. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the elements required by § 60-2.10 through § 60-2.16, an acceptable affirmative action program must include the...

  6. TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 3: Mission and System Requirements for the Total Earth Resources System

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Resource management missions to be performed by TERSSE are described. Mission and user requirements are defined along with information flows developed for each major resource management mission. Other topics discussed include: remote sensing platforms, remote sensor requirements, ground system architecture, and such related issues as cloud cover, resolution, orbit mechanics, and aircraft versus satellite.

  7. 48 CFR 7.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...

  8. 48 CFR 7.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...

  9. 48 CFR 7.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...

  10. 48 CFR 7.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...

  11. 48 CFR 7.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...

  12. FIREX mission requirements document for nonrenewable resources

    NASA Technical Reports Server (NTRS)

    Dixon, T.; Carsey, F.

    1982-01-01

    The proposed mission requirements and a proposed experimental program for satellite synthetic aperture radar (SAR) system named FIREX (Free-Flying Imaging Radar Experiment) for nonrenewable resources is described. The recommended spacecraft minimum SAR system is a C-band imager operating in four modes: (1) low look angle HH-polarized; (2) intermediate look angle, HH-polarized; (3) intermediate look angle, IIV-polarized; and (4) high look angle HH-polarized. This SAR system is complementary to other future spaceborne imagers such as the Thematic Mapper on LANDSAT-D. A near term aircraft SAR based research program is outlined which addresses specific mission design issues such as preferred incidence angles or polarizations for geologic targets of interest.

  13. Human resources requirements for highly active antiretroviral therapy scale-up in Malawi.

    PubMed

    Muula, Adamson S; Chipeta, John; Siziya, Seter; Rudatsikira, Emmanuel; Mataya, Ronald H; Kataika, Edward

    2007-12-19

    Twelve percent of the adult population in Malawi is estimated to be HIV infected. About 15% to 20% of these are in need of life saving antiretroviral therapy. The country has a public sector-led antiretroviral treatment program both in the private and public health sectors. Estimation of the clinical human resources needs is required to inform the planning and distribution of health professionals. We obtained data on the total number of patients on highly active antiretroviral treatment program from the Malawi National AIDS Commission and Ministry of Health, HIV Unit, and the number of registered health professionals from the relevant regulatory bodies. We also estimated number of health professionals required to deliver highly active antiretroviral therapy (HAART) using estimates of human resources from the literature. We also obtained data from the Ministry of Health on the actual number of nurses, clinical officers and medical doctors providing services in HAART clinics. We then made comparisons between the human resources situation on the ground and the theoretical estimates based on explicit assumptions. There were 610 clinicians (396 clinical officers and 214 physicians), 44 pharmacists and 98 pharmacy technicians and 7264 nurses registered in Malawi. At the end of March 2007 there were 85 clinical officer and physician full-time equivalents (FTEs) and 91 nurse FTEs providing HAART to 95,674 patients. The human resources used for the delivery of HAART comprised 13.9% of all clinical officers and physicians and 1.1% of all nurses. Using the estimated numbers of health professionals from the literature required 15.7-31.4% of all physicians and clinical officers, 66.5-199.3% of all pharmacists and pharmacy technicians and 2.6 to 9.2% of all the available nurses. To provide HAART to all the 170,000 HIV infected persons estimated as clinically eligible would require 4.7% to 16.4% of the total number of nurses, 118.1% to 354.2% of all the available pharmacists and

  14. 19 CFR 141.37 - Additional requirements for nonresident corporations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... corporations. 141.37 Section 141.37 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND... Additional requirements for nonresident corporations. If a nonresident corporation has not qualified to... authority of the grantor designated to execute the power of attorney on behalf of the corporation. [T.D. 84...

  15. 19 CFR 141.37 - Additional requirements for nonresident corporations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... corporations. 141.37 Section 141.37 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND... Additional requirements for nonresident corporations. If a nonresident corporation has not qualified to... authority of the grantor designated to execute the power of attorney on behalf of the corporation. [T.D. 84...

  16. 19 CFR 141.37 - Additional requirements for nonresident corporations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... corporations. 141.37 Section 141.37 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND... Additional requirements for nonresident corporations. If a nonresident corporation has not qualified to... authority of the grantor designated to execute the power of attorney on behalf of the corporation. [T.D. 84...

  17. 19 CFR 141.37 - Additional requirements for nonresident corporations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... corporations. 141.37 Section 141.37 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND... Additional requirements for nonresident corporations. If a nonresident corporation has not qualified to... authority of the grantor designated to execute the power of attorney on behalf of the corporation. [T.D. 84...

  18. 19 CFR 141.37 - Additional requirements for nonresident corporations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... corporations. 141.37 Section 141.37 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND... Additional requirements for nonresident corporations. If a nonresident corporation has not qualified to... authority of the grantor designated to execute the power of attorney on behalf of the corporation. [T.D. 84...

  19. 36 CFR 1236.24 - What are the additional requirements for managing unstructured electronic records?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements for managing unstructured electronic records? 1236.24 Section 1236.24 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.24 What are the additional requirements for managing...

  20. 36 CFR 1236.24 - What are the additional requirements for managing unstructured electronic records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for managing unstructured electronic records? 1236.24 Section 1236.24 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.24 What are the additional requirements for managing...

  1. 36 CFR 1236.24 - What are the additional requirements for managing unstructured electronic records?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements for managing unstructured electronic records? 1236.24 Section 1236.24 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.24 What are the additional requirements for managing...

  2. 36 CFR 1236.24 - What are the additional requirements for managing unstructured electronic records?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements for managing unstructured electronic records? 1236.24 Section 1236.24 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.24 What are the additional requirements for managing...

  3. 33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...

  4. 33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...

  5. 33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...

  6. 33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...

  7. 33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...

  8. 49 CFR 173.24b - Additional general requirements for bulk packagings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... packagings. 173.24b Section 173.24b Transportation Other Regulations Relating to Transportation PIPELINE AND... SHIPPERS-GENERAL REQUIREMENTS FOR SHIPMENTS AND PACKAGINGS Preparation of Hazardous Materials for Transportation § 173.24b Additional general requirements for bulk packagings. (a) Outage and filling limits. (1...

  9. Functional requirements of computer systems for the U.S. Geological Survey, Water Resources Division, 1988-97

    USGS Publications Warehouse

    Hathaway, R.M.; McNellis, J.M.

    1989-01-01

    Investigating the occurrence, quantity, quality, distribution, and movement of the Nation 's water resources is the principal mission of the U.S. Geological Survey 's Water Resources Division. Reports of these investigations are published and available to the public. To accomplish this mission, the Division requires substantial computer technology to process, store, and analyze data from more than 57,000 hydrologic sites. The Division 's computer resources are organized through the Distributed Information System Program Office that manages the nationwide network of computers. The contract that provides the major computer components for the Water Resources Division 's Distributed information System expires in 1991. Five work groups were organized to collect the information needed to procure a new generation of computer systems for the U. S. Geological Survey, Water Resources Division. Each group was assigned a major Division activity and asked to describe its functional requirements of computer systems for the next decade. The work groups and major activities are: (1) hydrologic information; (2) hydrologic applications; (3) geographic information systems; (4) reports and electronic publishing; and (5) administrative. The work groups identified 42 functions and described their functional requirements for 1988, 1992, and 1997. A few new functions such as Decision Support Systems and Executive Information Systems, were identified, but most are the same as performed today. Although the number of functions will remain about the same, steady growth in the size, complexity, and frequency of many functions is predicted for the next decade. No compensating increase in the Division 's staff is anticipated during this period. To handle the increased workload and perform these functions, new approaches will be developed that use advanced computer technology. The advanced technology is required in a unified, tightly coupled system that will support all functions simultaneously

  10. Health human resource planning requires an effective staff retention policy.

    PubMed

    Rondeau, Kent V

    2002-01-01

    Planning for health human resources requires us to think about the forces and factors that attract healthcare professionals to their jobs and keep them there. However, the forces for attracting healthcare employees to a job are not the same as those factors that keep them there. Without effective recruitment and retention policies for healthcare professionals, planning initiatives will continue to be ineffective.

  11. 76 FR 14562 - Federal Acquisition Regulation; Additional Requirements for Market Research

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... circumstances and entry of new businesses, on- going market research is not a waste of manpower and taxpayers..., Sequence 1] RIN 9000-AL50 Federal Acquisition Regulation; Additional Requirements for Market Research..., Market Research, of the National Defense Authorization Act for Fiscal Year 2008. Section 826 requires the...

  12. 78 FR 17641 - Procurement List Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... will not result in any additional reporting, recordkeeping or other compliance requirements for small.... The action will result in authorizing small entities to furnish the products and service to the.../Location: Information Technology (IT) Service, Defense Manpower Data Center (DMDC), Defense Human Resources...

  13. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime... the subcontract for any reason, the recipient must require the prime contractor to employ the six good...

  14. Cost of close the gap for vision of Indigenous Australians: On estimating the extra resources required.

    PubMed

    Hsueh, Ya-seng Arthur; Brando, Alex; Dunt, David; Anjou, Mitchell D; Boudville, Andrea; Taylor, Hugh

    2013-12-01

    To estimate the costs of the extra resources required to close the gap of vision between Indigenous and non-Indigenous Australians. Constructing comprehensive eye care pathways for Indigenous Australians with their related probabilities, to capture full eye care usage compared with current usage rate for cataract surgery, refractive error and diabetic retinopathy using the best available data. Urban and remote regions of Australia. The provision of eye care for cataract surgery, refractive error and diabetic retinopathy. Estimated cost needed for full access, estimated current spending and estimated extra cost required to close the gaps of cataract surgery, refractive error and diabetic retinopathy for Indigenous Australians. Total cost needed for full coverage of all three major eye conditions is $45.5 million per year in 2011 Australian dollars. Current annual spending is $17.4 million. Additional yearly cost required to close the gap of vision is $28 million. This includes extra-capped funds of $3 million from the Commonwealth Government and $2 million from the State and Territory Governments. Additional coordination costs per year are $13.3 million. Although available data are limited, this study has produced the first estimates that are indicative of the need for planning and provide equity in eye care. © 2013 The Authors. Australian Journal of Rural Health © National Rural Health Alliance Inc.

  15. Public perceptions of natural resource damages and the resources that require restoration.

    PubMed

    Burger, Joanna

    2010-01-01

    The public and health professionals are interested in restoring degraded ecosystem to provide goods and services. This study examined public perceptions in coastal New York and New Jersey about who is responsible for restoration of resources, which resources should be restored, by whom, and do they know the meaning of natural resource damage assessment (NRDA). More than 98% felt that resources should be restored; more (40%) thought the government should restore them, rather than the responsible party (23%). The highest rated resources were endangered wildlife, fish, mammals, and clams/crabs. Only 2% of respondents knew what NRDA meant. These data indicate that people felt strongly that resources should be restored and varied in who should restore them, suggesting that governmental agencies must clarify the relationship between chemical discharges, resource injury, NRDA, and restoration of those resources to produce clean air and water, fish and wildlife, and recreational opportunities.

  16. PUBLIC PERCEPTIONS OF NATURAL RESOURCE DAMAGES AND THE RESOURCES THAT REQUIRE RESTORATION

    PubMed Central

    Burger, Joanna

    2014-01-01

    The public and health professionals are interested in restoring degraded ecosystem to provide goods and services. This study examined public perceptions in coastal New York and New Jersey about who is responsible for restoration of resources, which resources should be restored, by whom, and do they know the meaning of natural resource damage assessment (NRDA). More than 98% felt that resources should be restored; more (40%) thought the government should restore them, rather than the responsible party (23%). The highest rated resources were endangered wildlife, fish, mammals, and clams/crabs. Only 2% of respondents knew what NRDA meant. These data indicate that people felt strongly that resources should be restored and varied in who should restore them, suggesting that governmental agencies must clarify the relationship between chemical discharges, resource injury, NRDA, and restoration of those resources to produce clean air and water, fish and wildlife, and recreational opportunities. PMID:20711934

  17. 18 CFR 807.1 - Requirement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Requirement. 807.1... WITHDRAWAL REGISTRATION § 807.1 Requirement. In addition to any other requirements of Commission regulations, and subject to the consent of the affected member state to this requirement, any person withdrawing or...

  18. 18 CFR 807.1 - Requirement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Requirement. 807.1... WITHDRAWAL REGISTRATION § 807.1 Requirement. In addition to any other requirements of Commission regulations, and subject to the consent of the affected member state to this requirement, any person withdrawing or...

  19. 18 CFR 807.1 - Requirement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Requirement. 807.1... WITHDRAWAL REGISTRATION § 807.1 Requirement. In addition to any other requirements of Commission regulations, and subject to the consent of the affected member state to this requirement, any person withdrawing or...

  20. 40 CFR 60.4176 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Additional requirements to provide heat... requirements to provide heat input data. The owner or operator of a Hg Budget unit that monitors and reports Hg... monitor and report heat input rate at the unit level using the procedures set forth in part 75 of this...

  1. 15 CFR 291.6 - Additional requirements; Federal policies and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 1 2012-01-01 2012-01-01 false Additional requirements; Federal policies and procedures. 291.6 Section 291.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST...

  2. 15 CFR 291.6 - Additional requirements; Federal policies and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Additional requirements; Federal policies and procedures. 291.6 Section 291.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST...

  3. 15 CFR 291.6 - Additional requirements; Federal policies and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Additional requirements; Federal policies and procedures. 291.6 Section 291.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST...

  4. 15 CFR 291.6 - Additional requirements; Federal policies and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Additional requirements; Federal policies and procedures. 291.6 Section 291.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST...

  5. 15 CFR 291.6 - Additional requirements; Federal policies and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Additional requirements; Federal policies and procedures. 291.6 Section 291.6 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST...

  6. 5 CFR 890.1025 - Cases where additional fact-finding is not required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Sanctions Imposed Against Health Care Providers Permissive Debarments § 890.1025 Cases where additional fact..., suspension, restriction, or nonrenewal by a State licensing authority; (2) Debarment, exclusion, suspension... additional fact-finding proceeding is not required when: (a) Prior adjudication. The proposed debarment is...

  7. 12 CFR 987.8 - Additional requirements; notice of attachment for Book-entry consolidated obligations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for Book-entry consolidated obligations. 987.8 Section 987.8 Banks and Banking FEDERAL HOUSING FINANCE BOARD OFFICE OF FINANCE BOOK-ENTRY PROCEDURE FOR CONSOLIDATED OBLIGATIONS § 987.8 Additional requirements; notice of attachment for Book-entry consolidated obligations. (a) Additional requirements. In any...

  8. 36 CFR § 1236.24 - What are the additional requirements for managing unstructured electronic records?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements for managing unstructured electronic records? § 1236.24 Section § 1236.24 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional Requirements for Electronic Records § 1236.24 What are the additional requirements for...

  9. 40 CFR 80.521 - What are the standards and identification requirements for diesel fuel additives?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... identification requirements for diesel fuel additives? 80.521 Section 80.521 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES... requirements for diesel fuel additives? (a) Except as provided in paragraph (b) of this section, any diesel...

  10. 40 CFR 80.521 - What are the standards and identification requirements for diesel fuel additives?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... identification requirements for diesel fuel additives? 80.521 Section 80.521 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES... requirements for diesel fuel additives? (a) Except as provided in paragraph (b) of this section, any diesel...

  11. 40 CFR 80.521 - What are the standards and identification requirements for diesel fuel additives?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... identification requirements for diesel fuel additives? 80.521 Section 80.521 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES... requirements for diesel fuel additives? (a) Except as provided in paragraph (b) of this section, any diesel...

  12. 40 CFR 80.521 - What are the standards and identification requirements for diesel fuel additives?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... identification requirements for diesel fuel additives? 80.521 Section 80.521 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES... requirements for diesel fuel additives? (a) Except as provided in paragraph (b) of this section, any diesel...

  13. 40 CFR 80.521 - What are the standards and identification requirements for diesel fuel additives?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... identification requirements for diesel fuel additives? 80.521 Section 80.521 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES... requirements for diesel fuel additives? (a) Except as provided in paragraph (b) of this section, any diesel...

  14. 42 CFR 489.66 - Additional requirements of the surety bond.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Additional requirements of the surety bond. 489.66 Section 489.66 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION PROVIDER AGREEMENTS AND SUPPLIER APPROVAL Surety Bond...

  15. 45 CFR 287.60 - Are there additional financial reporting and auditing requirements?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Are there additional financial reporting and... there additional financial reporting and auditing requirements? (a) The reporting of expenditures are... comply with all laws, regulations, and Departmental policies that govern submission of financial reports...

  16. 45 CFR 287.60 - Are there additional financial reporting and auditing requirements?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 2 2011-10-01 2011-10-01 false Are there additional financial reporting and... there additional financial reporting and auditing requirements? (a) The reporting of expenditures are... comply with all laws, regulations, and Departmental policies that govern submission of financial reports...

  17. 42 CFR 489.66 - Additional requirements of the surety bond.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Additional requirements of the surety bond. 489.66 Section 489.66 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... of this subpart, remains effective and the Surety remains liable for unpaid claims, civil money...

  18. Resource allocation in shared spectrum access communications for operators with diverse service requirements

    NASA Astrophysics Data System (ADS)

    Kibria, Mirza Golam; Villardi, Gabriel Porto; Ishizu, Kentaro; Kojima, Fumihide; Yano, Hiroyuki

    2016-12-01

    In this paper, we study inter-operator spectrum sharing and intra-operator resource allocation in shared spectrum access communication systems and propose efficient dynamic solutions to address both inter-operator and intra-operator resource allocation optimization problems. For inter-operator spectrum sharing, we present two competent approaches, namely the subcarrier gain-based sharing and fragmentation-based sharing, which carry out fair and flexible allocation of the available shareable spectrum among the operators subject to certain well-defined sharing rules, traffic demands, and channel propagation characteristics. The subcarrier gain-based spectrum sharing scheme has been found to be more efficient in terms of achieved throughput. However, the fragmentation-based sharing is more attractive in terms of computational complexity. For intra-operator resource allocation, we consider resource allocation problem with users' dissimilar service requirements, where the operator supports users with delay constraint and non-delay constraint service requirements, simultaneously. This optimization problem is a mixed-integer non-linear programming problem and non-convex, which is computationally very expensive, and the complexity grows exponentially with the number of integer variables. We propose less-complex and efficient suboptimal solution based on formulating exact linearization, linear approximation, and convexification techniques for the non-linear and/or non-convex objective functions and constraints. Extensive simulation performance analysis has been carried out that validates the efficiency of the proposed solution.

  19. 46 CFR 62.50-30 - Additional requirements for periodically unattended machinery plants.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Additional requirements for periodically unattended machinery plants. 62.50-30 Section 62.50-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Automated Self-propelled Vessel Manning § 62.50-30 Additional...

  20. 41 CFR 60-2.17 - Additional required elements of affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... elements of affirmative action programs. 60-2.17 Section 60-2.17 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 2-AFFIRMATIVE ACTION PROGRAMS Purpose and Contents of Affirmative Action Programs § 60-2.17 Additional required elements of affirmative action programs. In addition to the...

  1. Technical guide on documentation requirements for open market contract acquisitions of information resources

    NASA Technical Reports Server (NTRS)

    Shaw, Asa L., Jr.; Kivett, William R.; Taylor, James Y.

    1990-01-01

    A guide is presented to assist requestors in formulating and submitting the required Complete Package for Information Resources (IR) acquisitions. Advance discussions with cognizant procurement personnel are strongly recommended for complex IR requirements or for those requestors new to the acquisition process. Open Market means the requirement either is not available on GSA Schedule Contract or exceeds the $300,000 threshold and/or the quantity Maximum Order Limitation of the GSA Schedule Contract. Only open market contract acquisitions (i.e., in excess of the $25,000 small purchase threshold), are addressed.

  2. Analysis of requirements for accelerating the development of geothermal energy resources in California

    NASA Technical Reports Server (NTRS)

    Fredrickson, C. D.

    1978-01-01

    Various resource data are presented showing that geothermal energy has the potential of satisfying a singificant part of California's increasing energy needs. General factors slowing the development of geothermal energy in California are discussed and required actions to accelerate its progress are presented. Finally, scenarios for developing the most promising prospects in the state directed at timely on-line power are given. Specific actions required to realize each of these individual scenarios are identified.

  3. 46 CFR 111.105-39 - Additional requirements for vessels carrying vehicles with fuel in their tanks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Additional requirements for vessels carrying vehicles... SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-39 Additional requirements for vessels carrying vehicles with fuel in their tanks. Each vessel...

  4. 46 CFR 111.105-39 - Additional requirements for vessels carrying vehicles with fuel in their tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Additional requirements for vessels carrying vehicles... SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-39 Additional requirements for vessels carrying vehicles with fuel in their tanks. Each vessel...

  5. Global collaborative healthcare: assessing the resource requirements at a leading Academic Medical Center.

    PubMed

    Rosson, Nicole J; Hassoun, Heitham T

    2017-09-20

    Academic Medical Centers ("AMCs") have served as a hub of the United States ("US") health system and represented the state-of-the art in American health care for well over a century. Currently, the global healthcare market is both massive and expanding and is being altered by the unprecedented impact of technological advances and globalization. This provides AMCs a platform to enter into trans-national collaborative partnerships with healthcare organizations around the world, thus providing a means to deliver on its promise globally while also expanding and diversifying its resources. A number of leading US AMCs have engaged in global collaborative healthcare, employing different models based on services offered, global distribution, and inclination to assume risk. Engaging in these collaborations requires significant effort from across the health system, and an understanding of the resources required is paramount for effective delivery and to avoid overextension and diversion from the primary mission of these organizations. The goal of this paper is to discuss the role of US AMCs in this current global healthcare landscape and to also investigate our institutional faculty and staff resource requirements to support the operating model. We extracted and retrospectively analyzed data from the JHI Global Services database for a 3-year period (Jan, 2013-Dec, 2015) to determine total utilization (hours and full time equivalent (FTE)), utilization by profession, and clinical and non-clinical areas of expertise. JHI utilized on average 21,940 h annually, or 10.55 FTEs of faculty and staff subject matter experts. The majority of the hours are for work performed by physician faculty members from 23 departments within the School of Medicine, representing 77% percent or on average 16,894 h annually. Clinical and allied health departments had an average annual utilization of 17,642 h or 7.8 FTEs, while non-clinical departments, schools and institutes averaged 4298 h or 1

  6. 49 CFR 192.328 - Additional construction requirements for steel pipe using alternative maximum allowable operating...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Additional construction requirements for steel pipe using alternative maximum allowable operating pressure. 192.328 Section 192.328 Transportation... Lines and Mains § 192.328 Additional construction requirements for steel pipe using alternative maximum...

  7. 49 CFR 192.328 - Additional construction requirements for steel pipe using alternative maximum allowable operating...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Additional construction requirements for steel pipe using alternative maximum allowable operating pressure. 192.328 Section 192.328 Transportation... Lines and Mains § 192.328 Additional construction requirements for steel pipe using alternative maximum...

  8. South Carolina Commission on Higher Education Mission Resource Requirement, FY 2005-2006

    ERIC Educational Resources Information Center

    South Carolina Commission on Higher Education, 2005

    2005-01-01

    The Mission Resource Requirement (MRR) represents the level of funding necessary for an institution given its mission, size, and complexity of programs, based on regional and national norms, and the amount of the previous year's appropriation. This document is the MRR for the South Carolina Commission on Higher Education for Fiscal Year 2005-2006.…

  9. Ego depletion and positive illusions: does the construction of positivity require regulatory resources?

    PubMed

    Fischer, Peter; Greitemeyer, Tobias; Frey, Dieter

    2007-09-01

    Individuals frequently exhibit positive illusions about their own abilities, their possibilities to control their environment, and future expectations. The authors propose that positive illusions require resources of self-control, which is considered to be a limited resource similar to energy or strength. Five studies revealed that people with depleted self-regulatory resources indeed exhibited a less-optimistic sense of their own abilities (Study 1), a lower sense of subjective control (Study 2), and less-optimistic expectations about their future (Study 3). Two further studies shed light on the underlying psychological process: Ego-depleted (compared to nondepleted) individuals generated/retrieved less positive self-relevant attributes (Studies 4 and 5) and reported a lower sense of general self-efficacy (Study 5), which both partially mediated the impact of ego depletion on positive self-views (Study 5).

  10. Global resources outlook. [Requires best leadership of U. S. and other countries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bovay, H.E. Jr.

    Worldwide resource planning that is rational and equitable will dictate an orderly flow of materials between nations and require the best leadership the U.S. and other nations can develop. Resource trends show that the developing nations have begun asserting their power as suppliers of essential resources and that proliferation of nuclear materials could lead to wars of redistribution as competition for basic commodities intensifies. The trend in recent years has been toward the interdependence of nations, with most having some resources and depending on other nations for the rest of their needs. Since consumption trends for minerals, metals, and energymore » parallel the gross national product, developing countries will be increasing their consumption levels to raise their standard of living. Population projections indicate the lowest growth in the developed countries and a steep increase in the Third World, where living standards must be raised before effective birth control can take hold. Food production in developing countries has kept pace with population growth, but only the developed countries are able to develop a surplus. South America and Africa both contain large areas of land that is arable if the technology for clearing and cultivating is available. Other trends are outlined to show the need for new management of fishing, the use and dependency of minerals and fuels, metals, and the environment and technology as resources. (DCK)« less

  11. 24 CFR 570.711 - State borrowers; additional requirements and application procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false State borrowers; additional requirements and application procedures. 570.711 Section 570.711 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING...

  12. 24 CFR 570.711 - State borrowers; additional requirements and application procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true State borrowers; additional requirements and application procedures. 570.711 Section 570.711 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING...

  13. 24 CFR 570.711 - State borrowers; additional requirements and application procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false State borrowers; additional requirements and application procedures. 570.711 Section 570.711 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING...

  14. 42 CFR 403.306 - Additional requirements for State systems-mandatory approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Additional requirements for State systems-mandatory approval. 403.306 Section 403.306 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State...

  15. Estimation of crop water requirements using remote sensing for operational water resources management

    NASA Astrophysics Data System (ADS)

    Vasiliades, Lampros; Spiliotopoulos, Marios; Tzabiras, John; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-06-01

    An integrated modeling system, developed in the framework of "Hydromentor" research project, is applied to evaluate crop water requirements for operational water resources management at Lake Karla watershed, Greece. The framework includes coupled components for operation of hydrotechnical projects (reservoir operation and irrigation works) and estimation of agricultural water demands at several spatial scales using remote sensing. The study area was sub-divided into irrigation zones based on land use maps derived from Landsat 5 TM images for the year 2007. Satellite-based energy balance for mapping evapotranspiration with internalized calibration (METRIC) was used to derive actual evapotranspiration (ET) and crop coefficient (ETrF) values from Landsat TM imagery. Agricultural water needs were estimated using the FAO method for each zone and each control node of the system for a number of water resources management strategies. Two operational strategies of hydro-technical project development (present situation without operation of the reservoir and future situation with the operation of the reservoir) are coupled with three water demand strategies. In total, eight (8) water management strategies are evaluated and compared. The results show that, under the existing operational water resources management strategies, the crop water requirements are quite large. However, the operation of the proposed hydro-technical projects in Lake Karla watershed coupled with water demand management measures, like improvement of existing water distribution systems, change of irrigation methods, and changes of crop cultivation could alleviate the problem and lead to sustainable and ecological use of water resources in the study area.

  16. 49 CFR 218.105 - Additional operational requirements for hand-operated main track switches.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Additional operational requirements for hand... hand-operated main track switches. (a) Each railroad shall adopt and comply with an operating rule... the requirements of this section. (b) Designating switch position. The normal position of a hand...

  17. 46 CFR 111.105-39 - Additional requirements for vessels carrying vehicles with fuel in their tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Additional requirements for vessels carrying vehicles with fuel in their tanks. 111.105-39 Section 111.105-39 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-39 Additional requirements for vessels...

  18. 46 CFR 111.105-39 - Additional requirements for vessels carrying vehicles with fuel in their tanks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Additional requirements for vessels carrying vehicles with fuel in their tanks. 111.105-39 Section 111.105-39 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-39 Additional requirements for vessels...

  19. Estimating the resources required in the roll-out of universal access to antiretroviral treatment in Zimbabwe.

    PubMed

    Hallett, T B; Gregson, S; Dube, S; Mapfeka, E S; Mugurungi, O; Garnett, G P

    2011-12-01

    To develop projections of the resources required (person-years of drug supply and healthcare worker time) for universal access to antiretroviral treatment (ART) in Zimbabwe. A stochastic mathematical model of disease progression, diagnosis, clinical monitoring and survival in HIV infected individuals. The number of patients receiving ART is determined by many factors, including the strategy of the ART programme (method of initiation, frequency of patient monitoring, ability to include patients diagnosed before ART became available), other healthcare services (referral rates from antenatal clinics, uptake of HIV testing), demographic and epidemiological conditions (past and future trends in incidence rates and population growth) as well as the medical impact of ART (average survival and the relationship with CD4 count when initiated). The variations in these factors lead to substantial differences in long-term projections; with universal access by 2010 and no further prevention interventions, between 370 000 and almost 2 million patients could be receiving treatment in 2030-a fivefold difference. Under universal access, by 2010 each doctor will initiate ART for up to two patients every day and the case-load for nurses will at least triple as more patients enter care and start treatment. The resources required by ART programmes are great and depend on the healthcare systems and the demographic/epidemiological context. This leads to considerable uncertainty in long-term projections and large variation in the resources required in different countries and over time. Understanding how current practices relate to future resource requirements can help optimise ART programmes and inform long-term public health planning.

  20. 46 CFR 62.50-20 - Additional requirements for minimally attended machinery plants.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Automated Self-propelled Vessel Manning § 62.50-20 Additional... program must be functioning prior to the completion of the evaluation period for reduced manning required...

  1. 46 CFR 62.50-20 - Additional requirements for minimally attended machinery plants.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Automated Self-propelled Vessel Manning § 62.50-20 Additional... program must be functioning prior to the completion of the evaluation period for reduced manning required...

  2. 46 CFR 62.50-20 - Additional requirements for minimally attended machinery plants.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Automated Self-propelled Vessel Manning § 62.50-20 Additional... program must be functioning prior to the completion of the evaluation period for reduced manning required...

  3. 46 CFR 62.50-20 - Additional requirements for minimally attended machinery plants.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Automated Self-propelled Vessel Manning § 62.50-20 Additional... program must be functioning prior to the completion of the evaluation period for reduced manning required...

  4. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  5. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  6. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  7. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  8. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  9. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  10. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...

  11. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  12. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  13. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  14. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  15. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  16. 13 CFR 120.470 - What are SBA's additional requirements for SBLCs?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... requirements for SBLCs? 120.470 Section 120.470 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Lenders Small Business Lending Companies (sblc) § 120.470 What are SBA's additional... follow. (a) Lending. An SBLC may only make: (1) Loans under section 7(a) (except section 7(a)(13) of the...

  17. 13 CFR 120.470 - What are SBA's additional requirements for SBLCs?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... requirements for SBLCs? 120.470 Section 120.470 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Lenders Small Business Lending Companies (sblc) § 120.470 What are SBA's additional... follow. (a) Lending. An SBLC may only make: (1) Loans under section 7(a) (except section 7(a)(13) of the...

  18. 13 CFR 120.470 - What are SBA's additional requirements for SBLCs?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements for SBLCs? 120.470 Section 120.470 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Lenders Small Business Lending Companies (sblc) § 120.470 What are SBA's additional... follow. (a) Lending. An SBLC may only make: (1) Loans under section 7(a) (except section 7(a)(13) of the...

  19. 13 CFR 120.470 - What are SBA's additional requirements for SBLCs?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... requirements for SBLCs? 120.470 Section 120.470 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Lenders Small Business Lending Companies (sblc) § 120.470 What are SBA's additional... follow. (a) Lending. An SBLC may only make: (1) Loans under section 7(a) (except section 7(a)(13) of the...

  20. 13 CFR 120.470 - What are SBA's additional requirements for SBLCs?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... requirements for SBLCs? 120.470 Section 120.470 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Lenders Small Business Lending Companies (sblc) § 120.470 What are SBA's additional... follow. (a) Lending. An SBLC may only make: (1) Loans under section 7(a) (except section 7(a)(13) of the...

  1. 43 CFR 3515.23 - May BLM require me to submit additional information?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... require me to submit additional information? Yes. You must be willing to provide geologic and economic data we need to determine the fair market value of your preference right or lease to be relinquished. ...

  2. 45 CFR 96.86 - Exemption from requirement for additional outreach and intake services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and intake services. 96.86 Section 96.86 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES... requirement for additional outreach and intake services. The requirement in section 2605(b)(15) of Public Law 97-35 (42 U.S.C. 8624(b)(15)), as amended by section 704(a)(4) of the Augustus F. Hawkins Human...

  3. 24 CFR 982.629 - Homeownership option: Additional PHA requirements for family search and purchase.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PHA requirements for family search and purchase. 982.629 Section 982.629 Housing and Urban Development...: Additional PHA requirements for family search and purchase. (a) The PHA may establish the maximum time for a family to locate a home, and to purchase the home. (b) The PHA may require periodic family reports on the...

  4. 24 CFR 982.629 - Homeownership option: Additional PHA requirements for family search and purchase.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PHA requirements for family search and purchase. 982.629 Section 982.629 Housing and Urban Development...: Additional PHA requirements for family search and purchase. (a) The PHA may establish the maximum time for a family to locate a home, and to purchase the home. (b) The PHA may require periodic family reports on the...

  5. 24 CFR 982.629 - Homeownership option: Additional PHA requirements for family search and purchase.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PHA requirements for family search and purchase. 982.629 Section 982.629 Housing and Urban Development...: Additional PHA requirements for family search and purchase. (a) The PHA may establish the maximum time for a family to locate a home, and to purchase the home. (b) The PHA may require periodic family reports on the...

  6. 24 CFR 982.629 - Homeownership option: Additional PHA requirements for family search and purchase.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PHA requirements for family search and purchase. 982.629 Section 982.629 Housing and Urban Development...: Additional PHA requirements for family search and purchase. (a) The PHA may establish the maximum time for a family to locate a home, and to purchase the home. (b) The PHA may require periodic family reports on the...

  7. 24 CFR 982.629 - Homeownership option: Additional PHA requirements for family search and purchase.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PHA requirements for family search and purchase. 982.629 Section 982.629 Housing and Urban Development...: Additional PHA requirements for family search and purchase. (a) The PHA may establish the maximum time for a family to locate a home, and to purchase the home. (b) The PHA may require periodic family reports on the...

  8. BioUSeR: a semantic-based tool for retrieving Life Science web resources driven by text-rich user requirements

    PubMed Central

    2013-01-01

    Background Open metadata registries are a fundamental tool for researchers in the Life Sciences trying to locate resources. While most current registries assume that resources are annotated with well-structured metadata, evidence shows that most of the resource annotations simply consists of informal free text. This reality must be taken into account in order to develop effective techniques for resource discovery in Life Sciences. Results BioUSeR is a semantic-based tool aimed at retrieving Life Sciences resources described in free text. The retrieval process is driven by the user requirements, which consist of a target task and a set of facets of interest, both expressed in free text. BioUSeR is able to effectively exploit the available textual descriptions to find relevant resources by using semantic-aware techniques. Conclusions BioUSeR overcomes the limitations of the current registries thanks to: (i) rich specification of user information needs, (ii) use of semantics to manage textual descriptions, (iii) retrieval and ranking of resources based on user requirements. PMID:23635042

  9. Additive Manufacturing in Production: A Study Case Applying Technical Requirements

    NASA Astrophysics Data System (ADS)

    Ituarte, Iñigo Flores; Coatanea, Eric; Salmi, Mika; Tuomi, Jukka; Partanen, Jouni

    Additive manufacturing (AM) is expanding the manufacturing capabilities. However, quality of AM produced parts is dependent on a number of machine, geometry and process parameters. The variability of these parameters affects the manufacturing drastically and therefore standardized processes and harmonized methodologies need to be developed to characterize the technology for end use applications and enable the technology for manufacturing. This research proposes a composite methodology integrating Taguchi Design of Experiments, multi-objective optimization and statistical process control, to optimize the manufacturing process and fulfil multiple requirements imposed to an arbitrary geometry. The proposed methodology aims to characterize AM technology depending upon manufacturing process variables as well as to perform a comparative assessment of three AM technologies (Selective Laser Sintering, Laser Stereolithography and Polyjet). Results indicate that only one machine, laser-based Stereolithography, was feasible to fulfil simultaneously macro and micro level geometrical requirements but mechanical properties were not at required level. Future research will study a single AM system at the time to characterize AM machine technical capabilities and stimulate pre-normative initiatives of the technology for end use applications.

  10. South Carolina Commission on Higher Education Mission Resource Requirements (MRR), FY 2007-2008

    ERIC Educational Resources Information Center

    South Carolina Commission on Higher Education, 2007

    2007-01-01

    The Mission Resource Requirement (MRR) represents the level of funding necessary for an institution given its mission, size, and complexity of programs, based on regional and national norms, and the amount of the previous year's appropriation. This document is the MRR for the South Carolina Commission on Higher Education for Fiscal Year 2007-2008.…

  11. Children who face development risks due to maternal addiction during pregnancy require extra medical and psychosocial resources.

    PubMed

    Rangmar, Jenny; Lilja, Maria; Köhler, Marie; Reuter, Antonia

    2018-05-21

    This study examined medical and psychosocial risk factors in children born to women with addiction problems during pregnancy and the children's needs for extra medical and psychosocial resources. Swedish midwives routinely screen pregnant women for drugs and alcohol and refer women with addictions to the Maternity and Child Healthcare Resource Team. We investigated the medical records of 127 children (51% girls) whose mothers were referred to the Resource Team from 2009 to 2015. Additional data were obtained from local child healthcare services (CHS), which provide routine paediatric care. More than three-quarters (76%) of the children had prenatal exposure to alcohol and drugs, and 17% were born with withdrawal symptoms. The mothers had a high rate of psychiatric diagnoses (38%) and were more likely to smoke after delivery and less likely to breastfeed than the general population. However, adherence to the CHS programme was generally high. Additional visits to the nurse, referrals to specialists, collaboration meetings and reports of concerns to social services decreased when the children began attending ordinary CHS centres. Children born to women with addictions during pregnancy faced a high risk of developmental problems and should be offered additional CHS resources to minimise negative long-term consequences. ©2018 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  12. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.4 Advance declaration requirements for additionally planned production... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4...

  13. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.4 Advance declaration requirements for additionally planned production... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4...

  14. 22 CFR 124.9 - Additional clauses required only in manufacturing license agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... manufacturing license agreements. 124.9 Section 124.9 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL... Additional clauses required only in manufacturing license agreements. (a) Clauses for all manufacturing license agreements. The following clauses must be included only in manufacturing license agreements: (1...

  15. 75 FR 9114 - Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 217 Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to Multiyear Contracts (DFARS Case 2008-D023) AGENCY: Defense Acquisition Regulations System. Department of Defense (DoD). ACTION: Interim rule...

  16. 43 CFR 3275.18 - May BLM require me to test for byproducts associated with geothermal resource production?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false May BLM require me to test for byproducts associated with geothermal resource production? 3275.18 Section 3275.18 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE...

  17. 43 CFR 3275.18 - May BLM require me to test for byproducts associated with geothermal resource production?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false May BLM require me to test for byproducts associated with geothermal resource production? 3275.18 Section 3275.18 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE...

  18. 43 CFR 3275.18 - May BLM require me to test for byproducts associated with geothermal resource production?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false May BLM require me to test for byproducts associated with geothermal resource production? 3275.18 Section 3275.18 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE...

  19. 43 CFR 3275.18 - May BLM require me to test for byproducts associated with geothermal resource production?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false May BLM require me to test for byproducts associated with geothermal resource production? 3275.18 Section 3275.18 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE...

  20. Space Resource Requirements for Future In-Space Propellant Production Depots

    NASA Technical Reports Server (NTRS)

    Smitherman, David; Fikes, John; Roy, Stephanie; Henley, Mark W.; Potter, Seth D.; Howell, Joe T. (Technical Monitor)

    2001-01-01

    In 2000 and 2001 studies were conducted at the NASA Marshall Space Flight Center on the technical requirements and commercial potential for propellant production depots in low Earth orbit (LEO) to support future commercial, NASA, and other Agency missions. Results indicate that propellant production depots appear to be technically feasible given continued technology development, and there is a substantial growing market that depots could support. Systems studies showed that the most expensive part of transferring payloads to geosynchronous orbit (GEO) is the fuel. A cryogenic propellant production and storage depot stationed in LEO could lower the cost of missions to GEO and beyond. Propellant production separates water into hydrogen and oxygen through electrolysis. This process utilizes large amounts of power, therefore a depot derived from advanced space solar power technology was defined. Results indicate that in the coming decades there could be a significant demand for water-based propellants from Earth, moon, or asteroid resources if in-space transfer vehicles (upper stages) transitioned to reusable systems using water based propellants. This type of strategic planning move could create a substantial commercial market for space resources development, and ultimately lead toward significant commercial infrastructure development within the Earth-Moon system.

  1. Creating the spatial framework for National Aquatic Resource Surveys (NARS): Melding National Aquatic Data Sets with Survey Requirements

    EPA Science Inventory

    The U.S. EPA’s National Aquatic Resource Surveys (NARS) require a consistent spatial representation of the resource target populations being monitored (i.e., rivers and streams, lakes, coastal waters, and wetlands). A sample frame is the GIS representation of this target popula...

  2. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  3. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  4. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  5. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  6. 49 CFR 218.107 - Additional operational requirements for hand-operated crossover switches.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-operated crossover switches. 218.107 Section 218.107 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.107 Additional operational requirements for hand-operated crossover switches. (a) Each railroad shall adopt and comply with an operating rule which...

  7. 49 CFR 218.107 - Additional operational requirements for hand-operated crossover switches.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-operated crossover switches. 218.107 Section 218.107 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.107 Additional operational requirements for hand-operated crossover switches. (a) Each railroad shall adopt and comply with an operating rule which...

  8. 49 CFR 218.107 - Additional operational requirements for hand-operated crossover switches.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-operated crossover switches. 218.107 Section 218.107 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.107 Additional operational requirements for hand-operated crossover switches. (a) Each railroad shall adopt and comply with an operating rule which...

  9. 49 CFR 218.107 - Additional operational requirements for hand-operated crossover switches.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-operated crossover switches. 218.107 Section 218.107 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.107 Additional operational requirements for hand-operated crossover switches. (a) Each railroad shall adopt and comply with an operating rule which...

  10. 49 CFR 218.107 - Additional operational requirements for hand-operated crossover switches.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-operated crossover switches. 218.107 Section 218.107 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.107 Additional operational requirements for hand-operated crossover switches. (a) Each railroad shall adopt and comply with an operating rule which...

  11. 29 CFR 1910.126 - Additional requirements for special dipping and coating operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 5 2012-07-01 2012-07-01 false Additional requirements for special dipping and coating operations. 1910.126 Section 1910.126 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Hazardous Materials...

  12. TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 5: Detailed system requirements: Two case studies

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Major resource management missions to be performed by the TERSSE are examined in order to develop an understanding of the form and function of a system designed to perform an operational mission. Factors discussed include: resource manager (user) functions, methods of performing their function, the information flows and information requirements embodied in their function, and the characteristics of the observation system which assists in the management of the resource involved. The missions selected for study are: world crop survey and land resources management. These missions are found to represent opposite ends of the TERSSE spectrum and to support the conclusion that different missions require different systems and must be analyzed in detail to permit proper system development decisions.

  13. 26 CFR 1.852-7 - Additional information required in returns of shareholders.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Regulated Investment Companies and Real Estate Investment Trusts § 1.852-7 Additional information required in returns of shareholders. Any person who fails or refuses to comply with the demand of a regulated investment company for the written statements...

  14. 26 CFR 1.852-7 - Additional information required in returns of shareholders.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Regulated Investment Companies and Real Estate Investment Trusts § 1.852-7 Additional information required in returns of shareholders. Any person who fails or refuses to comply with the demand of a regulated investment company for the written statements...

  15. 26 CFR 1.852-7 - Additional information required in returns of shareholders.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Regulated Investment Companies and Real Estate Investment Trusts § 1.852-7 Additional information required in returns of shareholders. Any person who fails or refuses to comply with the demand of a regulated investment company for the written statements...

  16. 26 CFR 1.852-7 - Additional information required in returns of shareholders.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES (CONTINUED) Regulated Investment Companies and Real Estate Investment Trusts § 1.852-7 Additional information required in returns of shareholders. Any person who fails or refuses to comply with the demand of a regulated investment company for the written statements...

  17. 30 CFR 71.701 - Sampling; general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Sampling; general requirements. 71.701 Section... MINES Airborne Contaminants § 71.701 Sampling; general requirements. (a) Air samples will be taken by... operator shall conduct any additional air sampling tests and analyses as the Secretary may from time to...

  18. 30 CFR 71.701 - Sampling; general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Sampling; general requirements. 71.701 Section... MINES Airborne Contaminants § 71.701 Sampling; general requirements. (a) Air samples will be taken by... operator shall conduct any additional air sampling tests and analyses as the Secretary may from time to...

  19. 78 FR 18562 - Economic and Environmental Principles and Requirements for Water and Related Land Resources...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ... COUNCIL ON ENVIRONMENTAL QUALITY Economic and Environmental Principles and Requirements for Water... ``Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation... Secretary of the Army to revise the ``Economic and Environmental Principles and Guidelines for Water and...

  20. Enabling opportunistic resources for CMS Computing Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hufnagel, Dirk

    With the increased pressure on computing brought by the higher energy and luminosity from the LHC in Run 2, CMS Computing Operations expects to require the ability to utilize opportunistic resources resources not owned by, or a priori configured for CMS to meet peak demands. In addition to our dedicated resources we look to add computing resources from non CMS grids, cloud resources, and national supercomputing centers. CMS uses the HTCondor/glideinWMS job submission infrastructure for all its batch processing, so such resources will need to be transparently integrated into its glideinWMS pool. Bosco and parrot wrappers are used to enablemore » access and bring the CMS environment into these non CMS resources. Finally, we describe our strategy to supplement our native capabilities with opportunistic resources and our experience so far using them.« less

  1. Enabling opportunistic resources for CMS Computing Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hufnagel, Dick

    With the increased pressure on computing brought by the higher energy and luminosity from the LHC in Run 2, CMS Computing Operations expects to require the ability to utilize “opportunistic” resourcesresources not owned by, or a priori configured for CMS — to meet peak demands. In addition to our dedicated resources we look to add computing resources from non CMS grids, cloud resources, and national supercomputing centers. CMS uses the HTCondor/glideinWMS job submission infrastructure for all its batch processing, so such resources will need to be transparently integrated into its glideinWMS pool. Bosco and parrot wrappers are usedmore » to enable access and bring the CMS environment into these non CMS resources. Here we describe our strategy to supplement our native capabilities with opportunistic resources and our experience so far using them.« less

  2. Enabling opportunistic resources for CMS Computing Operations

    DOE PAGES

    Hufnagel, Dirk

    2015-12-23

    With the increased pressure on computing brought by the higher energy and luminosity from the LHC in Run 2, CMS Computing Operations expects to require the ability to utilize opportunistic resources resources not owned by, or a priori configured for CMS to meet peak demands. In addition to our dedicated resources we look to add computing resources from non CMS grids, cloud resources, and national supercomputing centers. CMS uses the HTCondor/glideinWMS job submission infrastructure for all its batch processing, so such resources will need to be transparently integrated into its glideinWMS pool. Bosco and parrot wrappers are used to enablemore » access and bring the CMS environment into these non CMS resources. Finally, we describe our strategy to supplement our native capabilities with opportunistic resources and our experience so far using them.« less

  3. 30 CFR 250.449 - What additional BOP testing requirements must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.449 What additional BOP... water to conduct this test. You may use drilling fluids to conduct subsequent tests of a subsea BOP...

  4. 30 CFR 250.449 - What additional BOP testing requirements must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.449 What additional BOP... water to conduct this test. You may use drilling fluids to conduct subsequent tests of a subsea BOP...

  5. 30 CFR 250.449 - What additional BOP testing requirements must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.449 What additional BOP... water to conduct this test. You may use drilling fluids to conduct subsequent tests of a subsea BOP...

  6. 47 CFR 5.311 - Additional requirements related to safety of the public.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... safety of the public. In addition to the notification requirements of § 5.309, for experiments that may... bands and geographic area as the planned experiment and, as appropriate, their end users; (b) Rapid identification, and elimination, of any harm the experiment may cause; and (c) Identifying an alternate means for...

  7. 47 CFR 5.311 - Additional requirements related to safety of the public.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... safety of the public. In addition to the notification requirements of § 5.309, for experiments that may... bands and geographic area as the planned experiment and, as appropriate, their end users; (b) Rapid identification, and elimination, of any harm the experiment may cause; and (c) Identifying an alternate means for...

  8. 21 CFR 70.25 - Labeling requirements for color additives (other than hair dyes).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... suitable for coloring the human body, shall state: (1) The name of the straight color or the name of each... AND HUMAN SERVICES GENERAL COLOR ADDITIVES Packaging and Labeling § 70.25 Labeling requirements for...

  9. 21 CFR 70.25 - Labeling requirements for color additives (other than hair dyes).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... suitable for coloring the human body, shall state: (1) The name of the straight color or the name of each... AND HUMAN SERVICES GENERAL COLOR ADDITIVES Packaging and Labeling § 70.25 Labeling requirements for...

  10. Pandemic influenza-implications for critical care resources in Australia and New Zealand.

    PubMed

    Anderson, Therese A; Hart, Graeme K; Kainer, Marion A

    2003-09-01

    To quantify resource requirements (additional beds and ventilator capacity), for critical care services in the event of pandemic influenza. Cross-sectional survey about existing and potential critical care resources. Participants comprised 156 of the 176 Australasian (Australia and New Zealand) critical care units on the database of the Australian and New Zealand Intensive Care Society (ANZICS) Research Centre for Critical Care Resources. The Meltzer, Cox and Fukuda model was adapted to map a range of influenza attack rate estimates for hospitalisation and episodes likely to require intensive care and to predict critical care admission rates and bed day requirements. Estimations of ventilation rates were based on those for community-acquired pneumonia. The estimated extra number of persons requiring hospitalisation ranged from 8,455 (10% attack rate) to 150,087 (45% attack rate). The estimated number of additional admissions to critical care units ranged from 423 (5% admission rate, 10% attack rate) to 37,522 (25% admission rate, 45% attack rate). The potential number of required intensive care bed days ranged from 846 bed days (2 day length of stay, 10% attack rate) to 375,220 bed days (10 day length of stay, 45% attack rate). The number of persons likely to require mechanical ventilation ranged from 106 (25% of projected critical care admissions, 10% attack rate) to 28,142 (75% of projected critical care admissions, 45% attack rate). An additional 1,195 emergency ventilator beds were identified in public sector and 248 in private sector hospitals. Cancellation of elective surgery could release a potential 76,402 intensive care bed days (per annum), but in the event of pandemic influenza, 31,150 bed days could be required over an 8- to 12-week period. Australasian critical care services would be overwhelmed in the event of pandemic influenza. More work is required in relation to modelling, contingency plans, and resource allocation.

  11. 30 CFR 250.449 - What additional BOP testing requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...? You must meet the following additional BOP testing requirements: (a) Use water to test a surface BOP system; (b) Stump test a subsea BOP system before installation. You must use water to conduct this test. You may use drilling fluids to conduct subsequent tests of a subsea BOP system; (c) Alternate tests...

  12. Validating Vegetable Production Unit (VPU) Plants, Protocols, Procedures and Requirements (P3R) using Currently Existing Flight Resources

    NASA Technical Reports Server (NTRS)

    Bingham, Gail; Bates, Scott; Bugbee, Bruce; Garland, Jay; Podolski, Igor; Levinskikh, Rita; Sychev, Vladimir; Gushin, Vadim

    2009-01-01

    Validating Vegetable Production Unit (VPU) Plants, Protocols, Procedures and Requirements (P3R) Using Currently Existing Flight Resources (Lada-VPU-P3R) is a study to advance the technology required for plant growth in microgravity and to research related food safety issues. Lada-VPU-P3R also investigates the non-nutritional value to the flight crew of developing plants on-orbit. The Lada-VPU-P3R uses the Lada hardware on the ISS and falls under a cooperative agreement between National Aeronautics and Space Administration (NASA) and the Russian Federal Space Association (FSA). Research Summary: Validating Vegetable Production Unit (VPU) Plants, Protocols, Procedures and Requirements (P3R) Using Currently Existing Flight Resources (Lada-VPU-P3R) will optimize hardware and

  13. 25 CFR 1000.396 - Does a Tribe/Consortium have additional ongoing requirements to maintain minimum standards for...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Does a Tribe/Consortium have additional ongoing requirements to maintain minimum standards for Tribe/Consortium management systems? 1000.396 Section 1000.396... Miscellaneous Provisions § 1000.396 Does a Tribe/Consortium have additional ongoing requirements to maintain...

  14. 42 CFR 482.104 - Condition of participation: Additional requirements for kidney transplant centers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for kidney transplant centers. 482.104 Section 482.104 Public Health CENTERS FOR MEDICARE & MEDICAID....104 Condition of participation: Additional requirements for kidney transplant centers. (a) Standard: End stage renal disease (ESRD) services. Kidney transplant centers must directly furnish...

  15. 42 CFR 482.104 - Condition of participation: Additional requirements for kidney transplant centers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for kidney transplant centers. 482.104 Section 482.104 Public Health CENTERS FOR MEDICARE & MEDICAID....104 Condition of participation: Additional requirements for kidney transplant centers. (a) Standard: End stage renal disease (ESRD) services. Kidney transplant centers must directly furnish...

  16. 76 FR 82308 - Guidance for Industry: Current Good Tissue Practice and Additional Requirements for Manufacturers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... Cells, Tissues, and Cellular and Tissue-Based Products; Availability AGENCY: Food and Drug... Requirements for Manufacturers of Human Cells, Tissues, and Cellular and Tissue-Based Products (HCT/Ps)'' dated... Tissue Practice (CGTP) and Additional Requirements for Manufacturers of Human Cells, Tissues, and...

  17. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance declaration requirements for additionally planned production of Schedule 3 chemicals. (a) Declaration... additionally planned production of Schedule 3 chemicals. 714.3 Section 714.3 Commerce and Foreign Trade...

  18. 14 CFR 91.1045 - Additional equipment requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... specified in that section. (5) Airborne weather radar as required by § 121.357 of this chapter, as... section, either: (i) Airborne thunderstorm detection equipment as required by § 135.173 of this chapter; or (ii) Airborne weather radar as required by § 135.175 of this chapter. ...

  19. 5 CFR 890.1027 - Cases where an additional fact-finding proceeding is required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... proceeding is required. 890.1027 Section 890.1027 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM Administrative Sanctions Imposed Against Health Care Providers Permissive Debarments § 890.1027 Cases where an additional...

  20. 32 CFR Appendix A to 32 Cfr Part 65 - Additional Reporting Requirements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements Table 1—Data Elements From DoD Instruction 1336.5 and DoD Instruction 7730.54 Relevant to This Part Field Data element name Description References 947-954 d. Initial Entry Training End Calendar Date... title 10, U.S.C See DoD Instruction 1336.5 for additional data elements. 955-971 Active Duty Loan...

  1. 78 FR 21159 - Additional Requirements for Special Dipping and Coating Operations (Dip Tanks); Extension of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ...] Additional Requirements for Special Dipping and Coating Operations (Dip Tanks); Extension of the Office of Management and Budget's Approval of the Information Collection (Paperwork) Requirement AGENCY: Occupational... requirement specified in its Standard on Dipping and Coating Operations (Dip Tanks) (29 CFR 1910.126(g)(4...

  2. Faithful Transfer Arbitrary Pure States with Mixed Resources

    NASA Astrophysics Data System (ADS)

    Luo, Ming-Xing; Li, Lin; Ma, Song-Ya; Chen, Xiu-Bo; Yang, Yi-Xian

    2013-09-01

    In this paper, we show that some special mixed quantum resource experience the same property of pure entanglement such as Bell state for quantum teleportation. It is shown that one mixed state and three bits of classical communication cost can be used to teleport one unknown qubit compared with two bits via pure resources. The schemes are easily implement with model physical techniques. Moreover, these resources are also optimal and typical for faithfully remotely prepare an arbitrary qubit, two-qubit and three-qubit states with mixed quantum resources. Our schemes are completed as same as those with pure quantum entanglement resources except only 1 bit additional classical communication cost required. The success probability is independent of the form of the mixed resources.

  3. 34 CFR 400.9 - What additional requirements govern the Vocational and Applied Technology Education Programs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Applied Technology Education Programs? 400.9 Section 400.9 Education Regulations of the Offices of the... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAMS-GENERAL PROVISIONS § 400.9 What additional requirements govern the Vocational and Applied Technology Education Programs? In addition to the Act, applicable...

  4. 34 CFR 400.9 - What additional requirements govern the Vocational and Applied Technology Education Programs?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Applied Technology Education Programs? 400.9 Section 400.9 Education Regulations of the Offices of the... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAMS-GENERAL PROVISIONS § 400.9 What additional requirements govern the Vocational and Applied Technology Education Programs? In addition to the Act, applicable...

  5. 34 CFR 400.9 - What additional requirements govern the Vocational and Applied Technology Education Programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Applied Technology Education Programs? 400.9 Section 400.9 Education Regulations of the Offices of the... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAMS-GENERAL PROVISIONS § 400.9 What additional requirements govern the Vocational and Applied Technology Education Programs? In addition to the Act, applicable...

  6. 34 CFR 400.9 - What additional requirements govern the Vocational and Applied Technology Education Programs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Applied Technology Education Programs? 400.9 Section 400.9 Education Regulations of the Offices of the... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAMS-GENERAL PROVISIONS § 400.9 What additional requirements govern the Vocational and Applied Technology Education Programs? In addition to the Act, applicable...

  7. 34 CFR 400.9 - What additional requirements govern the Vocational and Applied Technology Education Programs?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Applied Technology Education Programs? 400.9 Section 400.9 Education Regulations of the Offices of the... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAMS-GENERAL PROVISIONS § 400.9 What additional requirements govern the Vocational and Applied Technology Education Programs? In addition to the Act, applicable...

  8. 30 CFR 254.5 - General response plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 254.5 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL... plan requirements. (a) The response plan must provide for response to an oil spill from the facility... remove any spills of oil. (d) In addition to the requirements listed in this part, you must provide any...

  9. 47 CFR 54.202 - Additional requirements for Commission designation of eligible telecommunications carriers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Additional requirements for Commission designation of eligible telecommunications carriers. 54.202 Section 54.202 Telecommunication FEDERAL... telecommunications carriers. (a) In order to be designated an eligible telecommunications carrier under section 214(e...

  10. 47 CFR 54.202 - Additional requirements for Commission designation of eligible telecommunications carriers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Additional requirements for Commission designation of eligible telecommunications carriers. 54.202 Section 54.202 Telecommunication FEDERAL... telecommunications carriers. (a) In order to be designated an eligible telecommunications carrier under section 214(e...

  11. 47 CFR 54.202 - Additional requirements for Commission designation of eligible telecommunications carriers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Additional requirements for Commission designation of eligible telecommunications carriers. 54.202 Section 54.202 Telecommunication FEDERAL... telecommunications carriers. (a) In order to be designated an eligible telecommunications carrier under section 214(e...

  12. Comparison on Human Resource Requirement between Manual and Automated Dispensing Systems.

    PubMed

    Noparatayaporn, Prapaporn; Sakulbumrungsil, Rungpetch; Thaweethamcharoen, Tanita; Sangseenil, Wunwisa

    2017-05-01

    This study was conducted to compare human resource requirement among manual, automated, and modified automated dispensing systems. Data were collected from the pharmacy department at the 2100-bed university hospital (Siriraj Hospital, Bangkok, Thailand). Data regarding the duration of the medication distribution process were collected by using self-reported forms for 1 month. The data on the automated dispensing machine (ADM) system were obtained from 1 piloted inpatient ward, whereas those on the manual system were the average of other wards. Data on dispensing, returned unused medication, and stock management processes under the traditional manual system and the ADM system were from actual activities, whereas the modified ADM system was modeled. The full-time equivalent (FTE) of each model was estimated for comparison. The result showed that the manual system required 46.84 FTEs of pharmacists and 132.66 FTEs of pharmacy technicians. By adding pharmacist roles on screening and verification under the ADM system, the ADM system required 117.61 FTEs of pharmacists. Replacing counting and filling medication functions by ADM has decreased the number of pharmacy technicians to 55.38 FTEs. After the modified ADM system canceled the return unused medication process, FTEs requirement for pharmacists and pharmacy technicians decreased to 69.78 and 51.90 FTEs, respectively. The ADM system decreased the workload of pharmacy technicians, whereas it required more time from pharmacists. However, the increased workload of pharmacists was associated with more comprehensive patient care functions, which resulted from the redesigned work process. Copyright © 2017. Published by Elsevier Inc.

  13. Lunar exploration for resource utilization

    NASA Technical Reports Server (NTRS)

    Duke, Michael B.

    1992-01-01

    The strategy for developing resources on the Moon depends on the stage of space industrialization. A case is made for first developing the resources needed to provide simple materials required in large quantities for space operations. Propellants, shielding, and structural materials fall into this category. As the enterprise grows, it will be feasible to develop additional sources - those more difficult to obtain or required in smaller quantities. Thus, the first materials processing on the Moon will probably take the abundant lunar regolith, extract from it major mineral or glass species, and do relatively simple chemical processing. We need to conduct a lunar remote sensing mission to determine the global distribution of features, geophysical properties, and composition of the Moon, information which will serve as the basis for detailed models of and engineering decisions about a lunar mine.

  14. 42 CFR 436.210 - Individuals who meet the income and resource requirements of the cash assistance programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for Coverage of Families and Children and Aged, Blind, and Disabled Individuals, Including Pregnant Women § 436.210 Individuals who meet the income and resource requirements of the cash assistance...

  15. 42 CFR 436.210 - Individuals who meet the income and resource requirements of the cash assistance programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for Coverage of Families and Children and Aged, Blind, and Disabled Individuals, Including Pregnant Women § 436.210 Individuals who meet the income and resource requirements of the cash assistance...

  16. 42 CFR 436.210 - Individuals who meet the income and resource requirements of the cash assistance programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for Coverage of Families and Children and Aged, Blind, and Disabled Individuals, Including Pregnant Women § 436.210 Individuals who meet the income and resource requirements of the cash assistance...

  17. 42 CFR 436.210 - Individuals who meet the income and resource requirements of the cash assistance programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for Coverage of Families and Children and Aged, Blind, and Disabled Individuals, Including Pregnant Women § 436.210 Individuals who meet the income and resource requirements of the cash assistance...

  18. 49 CFR 218.105 - Additional operational requirements for hand-operated main track switches.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-operated main track switches. 218.105 Section 218.105 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.105 Additional operational requirements for hand-operated main track switches. (a) Each railroad shall adopt and comply with an operating rule...

  19. 49 CFR 218.105 - Additional operational requirements for hand-operated main track switches.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-operated main track switches. 218.105 Section 218.105 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.105 Additional operational requirements for hand-operated main track switches. (a) Each railroad shall adopt and comply with an operating rule...

  20. 49 CFR 218.105 - Additional operational requirements for hand-operated main track switches.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-operated main track switches. 218.105 Section 218.105 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.105 Additional operational requirements for hand-operated main track switches. (a) Each railroad shall adopt and comply with an operating rule...

  1. 49 CFR 218.105 - Additional operational requirements for hand-operated main track switches.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-operated main track switches. 218.105 Section 218.105 Transportation Other Regulations Relating to... PRACTICES Handling Equipment, Switches, and Fixed Derails § 218.105 Additional operational requirements for hand-operated main track switches. (a) Each railroad shall adopt and comply with an operating rule...

  2. 10 CFR 431.174 - Additional requirements applicable to Voluntary Independent Certification Program participants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Provisions for Commercial Heating, Ventilating, Air-Conditioning and Water Heating Products § 431.174 Additional... commercial HVAC and WH product, as described in § 431.176, and that complies with all requirements imposed by...

  3. 18 CFR 35.37 - Market power analysis required.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the proceeding will be able to review any of the data, information, analysis or other documentation... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Market power analysis... power analysis required. (a) (1) In addition to other requirements in subparts A and B, a Seller must...

  4. 18 CFR 35.37 - Market power analysis required.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the proceeding will be able to review any of the data, information, analysis or other documentation... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Market power analysis... power analysis required. (a) (1) In addition to other requirements in subparts A and B, a Seller must...

  5. Using Mosix for Wide-Area Compuational Resources

    USGS Publications Warehouse

    Maddox, Brian G.

    2004-01-01

    One of the problems with using traditional Beowulf-type distributed processing clusters is that they require an investment in dedicated computer resources. These resources are usually needed in addition to pre-existing ones such as desktop computers and file servers. Mosix is a series of modifications to the Linux kernel that creates a virtual computer, featuring automatic load balancing by migrating processes from heavily loaded nodes to less used ones. An extension of the Beowulf concept is to run a Mosixenabled Linux kernel on a large number of computer resources in an organization. This configuration would provide a very large amount of computational resources based on pre-existing equipment. The advantage of this method is that it provides much more processing power than a traditional Beowulf cluster without the added costs of dedicating resources.

  6. Methotrexate for uveitis associated with juvenile idiopathic arthritis: value and requirement for additional anti-inflammatory medication.

    PubMed

    Heiligenhaus, A; Mingels, A; Heinz, C; Ganser, G

    2007-01-01

    To study the value of methotrexate (MTX) and the requirement for additional anti-inflammatory drugs for the treatment of severe chronic iridocyclitis associated with juvenile idiopathic arthritis (JIA). Institutional study of 35 consecutive patients with JIA started on MTX as the single systemic immunosuppressive drug for the treatment of associated iridocyclitis. The clinical epidemiologic data, course of visual acuity (VA), development of complications, and the need for additional anti-inflammatory drugs were analyzed. Mean follow-up with MTX treatment was 27.6 months. Uveitic complications were present in 31 patients before MTX treatment. With MTX, quiescence of uveitis was obtained with (n=21) or without (n=4) additional topical steroids. Additional systemic immunosuppressive drugs were required in another 7 patients: cyclosporine A (n=4), azathioprine (n=1), infliximab (n=1), or etanercept (n=1). Three patients had active uveitis at the end of the follow-up period. During MTX therapy, uveitis first developed in the unaffected fellow eyes in 2 patients, and secondary glaucoma or ocular hypertension occurred in 7 patients. The VA deteriorated in 6, improved in 13, and was stable in the remaining eyes. The data suggest that MTX is very effective in controlling inflammation of uveitis in patients with JIA. However, additional topical steroids or systemic immunosuppressive drugs are often required.

  7. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  8. NREL: Renewable Resource Data Center - Solar Resource Information

    Science.gov Websites

    Solar Resource Information The Renewable Resource Data Center (RReDC) offers a collection of data and tools to assist with solar resource research. Learn more about RReDC's solar resource: Data Models siting. In addition, RReDC offers a solar resource glossary, unit conversion information, and an

  9. 15 CFR 971.420 - Resource conservation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... opportunity for the commercial recovery of the unrecovered balance of the hard mineral resources in the... THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS Issuance...

  10. Additive manufacturing in production: challenges and opportunities

    NASA Astrophysics Data System (ADS)

    Ahuja, Bhrigu; Karg, Michael; Schmidt, Michael

    2015-03-01

    Additive manufacturing, characterized by its inherent layer by layer fabrication methodology has been coined by many as the latest revolution in the manufacturing industry. Due to its diversification of Materials, processes, system technology and applications, Additive Manufacturing has been synonymized with terminology such as Rapid prototyping, 3D printing, free-form fabrication, Additive Layer Manufacturing, etc. A huge media and public interest in the technology has led to an innovative attempt of exploring the technology for applications beyond the scope of the traditional engineering industry. Nevertheless, it is believed that a critical factor for the long-term success of Additive Manufacturing would be its ability to fulfill the requirements defined by the traditional manufacturing industry. A parallel development in market trends and product requirements has also lead to a wider scope of opportunities for Additive Manufacturing. The presented paper discusses some of the key challenges which are critical to ensure that Additive Manufacturing is truly accepted as a mainstream production technology in the industry. These challenges would highlight on various aspects of production such as product requirements, process management, data management, intellectual property, work flow management, quality assurance, resource planning, etc. In Addition, changing market trends such as product life cycle, mass customization, sustainability, environmental impact and localized production will form the foundation for the follow up discussion on the current limitations and the corresponding research opportunities. A discussion on ongoing research to address these challenges would include topics like process monitoring, design complexity, process standardization, multi-material and hybrid fabrication, new material development, etc.

  11. 75 FR 34277 - Federal Acquisition Regulation; FAR Case 2008-007, Additional Requirements for Market Research

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ...The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) have agreed on an interim rule amending the Federal Acquisition Regulation (FAR) to implement Section 826 of the National Defense Authorization Act for Fiscal Year 2008 (FY08 NDAA). Section 826 established additional requirements in subsection (c) of 10 U.S.C. 2377. As a matter of policy, these requirements are extended to all executive agencies. Specifically, the head of the agency must conduct market research before issuing an indefinite-delivery indefinite-quantity (ID/IQ) task or delivery order for a noncommercial item in excess of the simplified acquisition threshold. In addition, a prime contractor with a contract in excess of $5 million for the procurement of items other than commercial items is required to conduct market research before making purchases that exceed the simplified acquisition threshold for or on behalf of the Government.

  12. 25 CFR Appendix A to Subpart D - Cultural Resource and Environmental Requirements for the IRR Program

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Cultural Resource and Environmental Requirements for the IRR Program A Appendix A to Subpart D Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  13. 21 CFR 1304.26 - Additional recordkeeping requirements applicable to drug products containing gamma-hydroxybutyric...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... to drug products containing gamma-hydroxybutyric acid. 1304.26 Section 1304.26 Food and Drugs DRUG....26 Additional recordkeeping requirements applicable to drug products containing gamma-hydroxybutyric....22, practitioners dispensing gamma-hydroxybutyric acid that is manufactured or distributed in...

  14. 47 CFR 1.20007 - Additional assistance capability requirements for wireline, cellular, and PCS telecommunications...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Additional assistance capability requirements for wireline, cellular, and PCS telecommunications carriers. 1.20007 Section 1.20007 Telecommunication... telecommunications carriers. (a) Definition—(1) Call-identifying information. Call identifying information means...

  15. 47 CFR 1.20007 - Additional assistance capability requirements for wireline, cellular, and PCS telecommunications...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Additional assistance capability requirements for wireline, cellular, and PCS telecommunications carriers. 1.20007 Section 1.20007 Telecommunication... telecommunications carriers. (a) Definition—(1) Call-identifying information. Call identifying information means...

  16. A case study of exploiting enterprise resource planning requirements

    NASA Astrophysics Data System (ADS)

    Niu, Nan; Jin, Mingzhou; Cheng, Jing-Ru C.

    2011-05-01

    The requirements engineering (RE) processes have become a key to conceptualising corporate-wide integrated solutions based on packaged enterprise resource planning (ERP) software. The RE literature has mainly focused on procuring the most suitable ERP package. Little is known about how an organisation exploits the chosen ERP RE model to frame the business application development. This article reports an exploratory case study of a key tenet of ERP RE adoption, namely that aligning business applications to the packaged RE model leads to integral practices and economic development. The case study analysed a series interrelated pilot projects developed for a business division of a large IT manufacturing and service company, using Oracle's appl1ication implementation method (AIM). The study indicated that AIM RE improved team collaboration and project management experience, but needed to make hidden assumptions explicit to support data visibility and integrity. Our study can direct researchers towards rigorous empirical evaluations of ERP RE adoption, collect experiences and lessons learned for practitioners, and help generate more effective and mature processes when exploiting ERP RE methods.

  17. Utilizing AI in Temporal, Spatial, and Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Stottler, Richard; Kalton, Annaka; Bell, Aaron

    2006-01-01

    Aurora is a software system enabling the rapid, easy solution of complex scheduling problems involving spatial and temporal constraints among operations and scarce resources (such as equipment, workspace, and human experts). Although developed for use in the International Space Station Processing Facility, Aurora is flexible enough that it can be easily customized for application to other scheduling domains and adapted as the requirements change or become more precisely known over time. Aurora s scheduling module utilizes artificial-intelligence (AI) techniques to make scheduling decisions on the basis of domain knowledge, including knowledge of constraints and their relative importance, interdependencies among operations, and possibly frequent changes in governing schedule requirements. Unlike many other scheduling software systems, Aurora focuses on resource requirements and temporal scheduling in combination. For example, Aurora can accommodate a domain requirement to schedule two subsequent operations to locations adjacent to a shared resource. The graphical interface allows the user to quickly visualize the schedule and perform changes reflecting additional knowledge or alterations in the situation. For example, the user might drag the activity corresponding to the start of operations to reflect a late delivery.

  18. Algae Resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Algae are highly efficient at producing biomass, and they can be found all over the planet. Many use sunlight and nutrients to create biomass, which contain key components—including lipids, proteins, and carbohydrates— that can be converted and upgraded to a variety of biofuels and products. A functional algal biofuels production system requires resources such as suitable land and climate, sustainable management of water resources, a supplemental carbon dioxide (CO2) supply, and other nutrients (e.g., nitrogen and phosphorus). Algae can be an attractive feedstock for many locations in the United States because their diversity allows for highpotential biomass yields in amore » variety of climates and environments. Depending on the strain, algae can grow by using fresh, saline, or brackish water from surface water sources, groundwater, or seawater. Additionally, they can grow in water from second-use sources such as treated industrial wastewater; municipal, agricultural, or aquaculture wastewater; or produced water generated from oil and gas drilling operations.« less

  19. 12 CFR 1270.18 - Additional requirements; notice of attachment for Book-entry consolidated obligations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... for Book-entry consolidated obligations. 1270.18 Section 1270.18 Banks and Banking FEDERAL HOUSING FINANCE AGENCY FEDERAL HOME LOAN BANKS LIABILITIES Book-Entry Procedure for Consolidated Obligations § 1270.18 Additional requirements; notice of attachment for Book-entry consolidated obligations. (a...

  20. 12 CFR 1270.18 - Additional requirements; notice of attachment for Book-entry consolidated obligations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... for Book-entry consolidated obligations. 1270.18 Section 1270.18 Banks and Banking FEDERAL HOUSING FINANCE AGENCY FEDERAL HOME LOAN BANKS LIABILITIES Book-Entry Procedure for Consolidated Obligations § 1270.18 Additional requirements; notice of attachment for Book-entry consolidated obligations. (a...

  1. 12 CFR 1270.18 - Additional requirements; notice of attachment for Book-entry consolidated obligations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... for Book-entry consolidated obligations. 1270.18 Section 1270.18 Banks and Banking FEDERAL HOUSING FINANCE AGENCY FEDERAL HOME LOAN BANKS LIABILITIES Book-Entry Procedure for Consolidated Obligations § 1270.18 Additional requirements; notice of attachment for Book-entry consolidated obligations. (a...

  2. 39 CFR 3050.13 - Additional documentation required in the Postal Service's section 3652 report.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Service's section 3652 report. 3050.13 Section 3050.13 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PERIODIC REPORTING § 3050.13 Additional documentation required in the Postal Service's section... recent Annual Compliance Determination was issued and the reasons that those changes were accepted. ...

  3. 36 CFR 1236.22 - What are the additional requirements for managing electronic mail records?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements for managing electronic mail records? 1236.22 Section 1236.22 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional... accordance with the provisions of GRS 23, Item 5. (5) Draft documents that are circulated on electronic mail...

  4. 36 CFR 1236.22 - What are the additional requirements for managing electronic mail records?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements for managing electronic mail records? 1236.22 Section 1236.22 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional... accordance with the provisions of GRS 23, Item 5. (5) Draft documents that are circulated on electronic mail...

  5. 36 CFR 1236.22 - What are the additional requirements for managing electronic mail records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for managing electronic mail records? 1236.22 Section 1236.22 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional... accordance with the provisions of GRS 23, Item 5. (5) Draft documents that are circulated on electronic mail...

  6. 36 CFR 1236.22 - What are the additional requirements for managing electronic mail records?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements for managing electronic mail records? 1236.22 Section 1236.22 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT ELECTRONIC RECORDS MANAGEMENT Additional... accordance with the provisions of GRS 23, Item 5. (5) Draft documents that are circulated on electronic mail...

  7. 49 CFR 173.301b - Additional general requirements for shipment of UN pressure receptacles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... pressure receptacles. 173.301b Section 173.301b Transportation Other Regulations Relating to Transportation....301b Additional general requirements for shipment of UN pressure receptacles. (a) General. The... gases in UN pressure receptacles. A UN pressure receptacle, including closures, must conform to the...

  8. Student Library Resource Requirements in Philadelphia. Evaluation Report, Phase IV, June 15, 1971 - June 30, 1972.

    ERIC Educational Resources Information Center

    Benford, John Q.

    Phase IV of the Student Library Resource Requirements Project had as its two main purposes: (1) the establishment of a student learning center demonstration, with the collaboration of school and public library organizations and to begin its operation and evaluation and (2) to expand the well-established interagency planning mechanism into other…

  9. 26 CFR 1.46-7 - Statutory provisions; plan requirements for taxpayers electing additional investment credit, etc.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Investment in Certain Depreciable Property § 1.46-7 Statutory provisions; plan requirements for taxpayers electing additional investment credit, etc. As amended by sections 802(b)(7), and 803 (c), (d), and (e) of... taxpayers electing additional investment credit, etc. 1.46-7 Section 1.46-7 Internal Revenue INTERNAL...

  10. 19 CFR 191.103 - Additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TREASURY (CONTINUED) DRAWBACK Internal Revenue Tax on Flavoring Extracts and Medicinal or Toilet... requirements. (a) Manufacturer claims domestic drawback. In the case of medicinal preparations and flavoring... filed with the Bureau of Alcohol, Tobacco and Firearms for domestic drawback on medicinal preparations...

  11. Additive Manufacturing of Porous Metal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dehoff, Ryan R.; Kirka, Michael M.

    2017-06-01

    Currently, helium is obtained through separation from natural gas. The current industrial process incurs significant costs and requires large energy resources to successfully achieve separation. Through utilizing Additive Manufacturing (AM) technologies it is possible to reduce both of these burdens when refining helium gas. The ability to engineer porosity levels within Inconel 718 discs for controlled separation of helium from natural gas was investigated. Arrays of samples fabricated using the electron beam melting process were analyzed for their relative porosity density. Based upon the measurements, full scale discs were fabricated, and subsequently tested to determine their effectiveness in separating heliummore » from liquefied natural gas.« less

  12. Perspectives on the utilization of aquaculture coproduct in Europe and Asia: prospects for value addition and improved resource efficiency.

    PubMed

    Newton, Richard; Telfer, Trevor; Little, Dave

    2014-01-01

    Aquaculture has often been criticized for its environmental impacts, especially efficiencies concerning global fisheries resources for use in aquafeeds among others. However, little attention has been paid to the contribution of coproducts from aquaculture, which can vary between 40% and 70% of the production. These have often been underutilized and could be redirected to maximize the efficient use of resource inputs including reducing the burden on fisheries resources. In this review, we identify strategies to enhance the overall value of the harvested yield including noneffluent processing coproducts for three of the most important global aquaculture species, and discuss the current and prospective utilization of these resources for value addition and environmental impact reduction. The review concludes that in Europe coproducts are often underutilized because of logistical reasons such as the disconnected nature of the value chain, and perceived legislative barriers. However, in Asia, most coproducts are used, often innovatively but not to their full economic potential and sometimes with possible human health and biosecurity risks. These include possible spread of diseased material and low traceability in some circumstances. Full economic and environmental appraisal is long overdue for the current and potential strategies available for coproduct utilization.

  13. 49 CFR 173.301b - Additional general requirements for shipment of UN pressure receptacles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Group I performance level. (d) Non-refillable UN pressure receptacles. (1) When the use of a valve is... pressure receptacles. 173.301b Section 173.301b Transportation Other Regulations Relating to Transportation....301b Additional general requirements for shipment of UN pressure receptacles. (a) General. The...

  14. 49 CFR 173.301b - Additional general requirements for shipment of UN pressure receptacles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Group I performance level. (d) Non-refillable UN pressure receptacles. (1) When the use of a valve is... pressure receptacles. 173.301b Section 173.301b Transportation Other Regulations Relating to Transportation....301b Additional general requirements for shipment of UN pressure receptacles. (a) General. The...

  15. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  16. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  17. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  18. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  19. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  20. Survey of resource opportunities and critical evaluation of economic requirements

    NASA Technical Reports Server (NTRS)

    Clark, Benton C.

    1991-01-01

    A series of mission analyses were performed to evaluate human mission to Mars and the moon with and without the aid of planetary resource utilization. The types of trade studies that are considered include the use of resources to manufacture propellant, food, habitat atmospheric gases, and lander habitat structure. Also, the potential for export of resources from the moon, Mars, Phobos, Deimos, and selected asteroids is also examined. In all cases, mass leveraging is evaluated. For certain cases, economic factors are evaluated as well. It is concluded that some uses are highly leveraging on the mission, whereas others have lesser impact and, therefore, should be afforded lesser priority in resource utilization studies. This survey is made with a consistent set of scaling laws for spacecraft propulsion and habitation systems and subsystems, and therefore, provides a rational basis for comparing different resource locations and use strategies.

  1. 50 CFR 23.25 - What additional information is required on a non-Party CITES document?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....25 What additional information is required on a non-Party CITES document? (a) Purpose. Under Article... Certification (1) Export (i) For Appendix-I and -II specimens, the Scientific Authority has advised that the...

  2. 33 CFR 203.83 - Additional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... deteriorated components such as outlet structures and pipes, removal of debris, and new construction items such... furnishing flood fight assistance during an emergency. (b) Areas of minor damage, flood control works..., placing sod, or seeding completed work. (d) Adequacy of requirements of local cooperation. In determining...

  3. 14 CFR 1274.904 - Resource sharing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... will share in providing the resources necessary to perform the agreement. NASA funding and non-cash contributions (personnel, equipment, facilities, etc.) and the dollar value of the Recipient's cash and/or non-cash contribution will be on a __ percent (NASA)—__ percent (Recipient) basis. Criteria and procedures...

  4. 40 CFR 96.76 - Additional requirements to provide heat input data for allocations purposes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.76 Additional requirements... to monitor and report NOX Mass emissions using a NOX concentration system and a flow system shall... chapter for any source located in a state developing source allocations based upon heat input. (b) The...

  5. An Optimization Model for Scheduling Problems with Two-Dimensional Spatial Resource Constraint

    NASA Technical Reports Server (NTRS)

    Garcia, Christopher; Rabadi, Ghaith

    2010-01-01

    Traditional scheduling problems involve determining temporal assignments for a set of jobs in order to optimize some objective. Some scheduling problems also require the use of limited resources, which adds another dimension of complexity. In this paper we introduce a spatial resource-constrained scheduling problem that can arise in assembly, warehousing, cross-docking, inventory management, and other areas of logistics and supply chain management. This scheduling problem involves a twodimensional rectangular area as a limited resource. Each job, in addition to having temporal requirements, has a width and a height and utilizes a certain amount of space inside the area. We propose an optimization model for scheduling the jobs while respecting all temporal and spatial constraints.

  6. Educating Faculty Members on the Importance of Requiring High-Quality Information Resources at a Community College

    ERIC Educational Resources Information Center

    Auten, Beth; Glauner, Dana; Lefoe, Grant; Henry, Jo

    2016-01-01

    This article explains how the South Piedmont Community College librarians educated faculty members about how they guide student use of the library and how it is advantageous for them to require high-quality resources for student papers. As documented by observations at SPCC and in the library literature, students use the tools they know to find…

  7. Resource sharing of online teaching materials: The lon-capa project

    NASA Astrophysics Data System (ADS)

    Bauer, Wolfgang

    2004-03-01

    The use of information technology resources in conventional lecture-based courses, in distance-learning offerings, as well as hybrid courses, is increasing. But this may put additional burden on faculty, who are now asked to deliver this new content. Additionally, it may require the installation of commercial courseware systems, putting the colleges and universities in new financial licensing dependencies. To address exactly these two problems, the lon-capa system was invented to provide an open-source, gnu public license based, courseware system that allows for sharing of educational resources across institutional and disciplinary boundaries. This presentation will focus on both aspects of the system, the courseware capabilities that allow for customized environments for individual students, and the educational resources library that enables teachers to take full advantages of the work of their colleagues. Research results on learning effectiveness, resource and system usage patterns, and customization for different learning styles will be shown. Institutional perceptions of and responses to open source courseware systems will be discussed.

  8. 49 CFR 171.24 - Additional requirements for the use of the ICAO Technical Instructions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Additional requirements for the use of the ICAO... the United States by aircraft, and by motor vehicle or rail either before or after being transported by aircraft in accordance with the ICAO Technical Instructions (IBR, see § 171.7), as authorized in...

  9. Research on elastic resource management for multi-queue under cloud computing environment

    NASA Astrophysics Data System (ADS)

    CHENG, Zhenjing; LI, Haibo; HUANG, Qiulan; Cheng, Yaodong; CHEN, Gang

    2017-10-01

    As a new approach to manage computing resource, virtualization technology is more and more widely applied in the high-energy physics field. A virtual computing cluster based on Openstack was built at IHEP, using HTCondor as the job queue management system. In a traditional static cluster, a fixed number of virtual machines are pre-allocated to the job queue of different experiments. However this method cannot be well adapted to the volatility of computing resource requirements. To solve this problem, an elastic computing resource management system under cloud computing environment has been designed. This system performs unified management of virtual computing nodes on the basis of job queue in HTCondor based on dual resource thresholds as well as the quota service. A two-stage pool is designed to improve the efficiency of resource pool expansion. This paper will present several use cases of the elastic resource management system in IHEPCloud. The practical run shows virtual computing resource dynamically expanded or shrunk while computing requirements change. Additionally, the CPU utilization ratio of computing resource was significantly increased when compared with traditional resource management. The system also has good performance when there are multiple condor schedulers and multiple job queues.

  10. 18 CFR 1314.10 - Additional provisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Additional provisions. 1314.10 Section 1314.10 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY BOOK-ENTRY PROCEDURES FOR TVA POWER SECURITIES ISSUED THROUGH THE FEDERAL RESERVE BANKS § 1314.10 Additional provisions...

  11. 18 CFR 1314.10 - Additional provisions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Additional provisions. 1314.10 Section 1314.10 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY BOOK-ENTRY PROCEDURES FOR TVA POWER SECURITIES ISSUED THROUGH THE FEDERAL RESERVE BANKS § 1314.10 Additional provisions...

  12. 18 CFR 33.10 - Additional information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Additional information. 33.10 Section 33.10 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... § 33.10 Additional information. The Director of the Office of Energy Market Regulation, or his designee...

  13. 20 CFR 30.518 - Can OWCP require the recipient of the overpayment to submit additional financial information?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... overpayment to submit additional financial information? 30.518 Section 30.518 Employees' Benefits OFFICE OF... OWCP require the recipient of the overpayment to submit additional financial information? (a) The... specified by OWCP. This information is needed to determine whether or not recovery of an overpayment would...

  14. 20 CFR 30.518 - Can OWCP require the recipient of the overpayment to submit additional financial information?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... overpayment to submit additional financial information? 30.518 Section 30.518 Employees' Benefits OFFICE OF... OWCP require the recipient of the overpayment to submit additional financial information? (a) The... specified by OWCP. This information is needed to determine whether or not recovery of an overpayment would...

  15. 20 CFR 30.518 - Can OWCP require the recipient of the overpayment to submit additional financial information?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... overpayment to submit additional financial information? 30.518 Section 30.518 Employees' Benefits OFFICE OF... OWCP require the recipient of the overpayment to submit additional financial information? (a) The... specified by OWCP. This information is needed to determine whether or not recovery of an overpayment would...

  16. Awareness-based game-theoretic space resource management

    NASA Astrophysics Data System (ADS)

    Chen, Genshe; Chen, Huimin; Pham, Khanh; Blasch, Erik; Cruz, Jose B., Jr.

    2009-05-01

    Over recent decades, the space environment becomes more complex with a significant increase in space debris and a greater density of spacecraft, which poses great difficulties to efficient and reliable space operations. In this paper we present a Hierarchical Sensor Management (HSM) method to space operations by (a) accommodating awareness modeling and updating and (b) collaborative search and tracking space objects. The basic approach is described as follows. Firstly, partition the relevant region of interest into district cells. Second, initialize and model the dynamics of each cell with awareness and object covariance according to prior information. Secondly, explicitly assign sensing resources to objects with user specified requirements. Note that when an object has intelligent response to the sensing event, the sensor assigned to observe an intelligent object may switch from time-to-time between a strong, active signal mode and a passive mode to maximize the total amount of information to be obtained over a multi-step time horizon and avoid risks. Thirdly, if all explicitly specified requirements are satisfied and there are still more sensing resources available, we assign the additional sensing resources to objects without explicitly specified requirements via an information based approach. Finally, sensor scheduling is applied to each sensor-object or sensor-cell pair according to the object type. We demonstrate our method with realistic space resources management scenario using NASA's General Mission Analysis Tool (GMAT) for space object search and track with multiple space borne observers.

  17. Space Science Education Resource Directory

    NASA Astrophysics Data System (ADS)

    Christian, C. A.; Scollick, K.

    The Office of Space Science (OSS) of NASA supports educational programs as a by-product of the research it funds through missions and investigative programs. A rich suite of resources for public use is available including multimedia materials, online resources, hardcopies and other items. The OSS supported creation of a resource catalog through a group lead by individuals at STScI that ultimately will provide an easy-to-use and user-friendly search capability to access products. This paper describes the underlying architecture of that catalog, including the challenge to develop a system for characterizing education products through appropriate metadata. The system must also be meaningful to a large clientele including educators, scientists, students, and informal science educators. An additional goal was to seamlessly exchange data with existing federally supported educational systems as well as local systems. The goals, requirements, and standards for the catalog will be presented to illuminate the rationale for the implementation ultimately adopted.

  18. Adequacy of Material Resources Required for Effective Implementation of Upper Basic Education Business Studies Curriculum in Nigeria

    ERIC Educational Resources Information Center

    Okoli, B. E.; Okorie, Ogbonnaya

    2015-01-01

    This work is a descriptive survey of the adequacy of the material resources required for effective implementation of upper basic education business studies curriculum in Ebonyi State. Two research questions and two hypotheses guided the study. The entire population of two hundred and forty-one (241) business studies teachers were used for the…

  19. TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 8: User's Mission and System Requirements Data (appendix A of Volume 3)

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A computer printout is presented of the mission requirement for the TERSSE missions and their associated user tasks. The data included in the data base represents a broad-based attempt to define the amount, extent, and type of information needed for an earth resources management program in the era of the space shuttle. An effort was made to consider all aspects of remote sensing and resource management; because of its broad scope, it is not intended that the data be used without verification for in-depth studies of particular missions and/or users. The data base represents the quantitative structure necessary to define the TERSSE architecture and requirements, and to an overall integrated view of the earth resources technology requirements of the 1980's.

  20. Concurrent negotiation and coordination for grid resource coallocation.

    PubMed

    Sim, Kwang Mong; Shi, Benyun

    2010-06-01

    Bolstering resource coallocation is essential for realizing the Grid vision, because computationally intensive applications often require multiple computing resources from different administrative domains. Given that resource providers and consumers may have different requirements, successfully obtaining commitments through concurrent negotiations with multiple resource providers to simultaneously access several resources is a very challenging task for consumers. The impetus of this paper is that it is one of the earliest works that consider a concurrent negotiation mechanism for Grid resource coallocation. The concurrent negotiation mechanism is designed for 1) managing (de)commitment of contracts through one-to-many negotiations and 2) coordination of multiple concurrent one-to-many negotiations between a consumer and multiple resource providers. The novel contributions of this paper are devising 1) a utility-oriented coordination (UOC) strategy, 2) three classes of commitment management strategies (CMSs) for concurrent negotiation, and 3) the negotiation protocols of consumers and providers. Implementing these ideas in a testbed, three series of experiments were carried out in a variety of settings to compare the following: 1) the CMSs in this paper with the work of others in a single one-to-many negotiation environment for one resource where decommitment is allowed for both provider and consumer agents; 2) the performance of the three classes of CMSs in different resource market types; and 3) the UOC strategy with the work of others [e.g., the patient coordination strategy (PCS )] for coordinating multiple concurrent negotiations. Empirical results show the following: 1) the UOC strategy achieved higher utility, faster negotiation speed, and higher success rates than PCS for different resource market types; and 2) the CMS in this paper achieved higher final utility than the CMS in other works. Additionally, the properties of the three classes of CMSs in