Sample records for aerogeophysical project serra

  1. Gamma Radiation Dose Rate in Air due to Terrestrial Radionuclides in Southern Brazil: Synthesis by Geological Units and Lithotypes Covered by the Serra do Mar Sul Aero-Geophysical Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bastos, Rodrigo O.; Appoloni, Carlos R.; Pinese, Jose P. P.

    2008-08-07

    The absorbed dose rates in air due to terrestrial radionuclides were estimated from aerial gamma spectrometric data for an area of 48,600 km{sup 2} in Southern Brazil. The source data was the Serra do Mar Sul Aero-Geophysical Project back-calibrated in a cooperative work among the Geological Survey of Brazil, the Geological Survey of Canada, and Paterson, Grant and Watson Ltd. The concentrations of eU (ppm), eTh (ppm) and K (%) were converted to dose rates in air (nGy{center_dot}h{sup -1}) by accounting for the contribution of each element's concentration. Regional variation was interpreted according to lithotypes and a synthesis was performedmore » according to the basic geological units present in the area. Higher values of total dose were estimated for felsic igneous and metamorphic rocks, with average values varying up to 119{+-}24 nGy{center_dot}h{sup -1}, obtained by Anitapolis syenite body. Sedimentary, metasedimentary and metamafic rocks presented the lower dose levels, and some beach deposits reached the lowest average total dose, 18.5{+-}8.2 nGy{center_dot}h{sup -1}. Thorium gives the main average contribution in all geological units, the highest value being reached by the nebulitic gneisses of Atuba Complex, 71{+-}23 nGy{center_dot}h{sup -1}. Potassium presents the lowest average contribution to dose rate in 53 of the 72 units analyzed, the highest contribution being obtained by intrusive alkaline bodies (28{+-}12 nGy{center_dot}h{sup -1}). The general pattern of geographic dose distribution respects well the hypotheses on geo-physicochemical behavior of radioactive elements.« less

  2. GAMBIT--Gamburtsev Aerogeophysical Mapping of Bedrock and Ice Targets During IPY

    NASA Astrophysics Data System (ADS)

    Studinger, M.; Finn, C. A.; Bell, R. E.; Gogineni, S.; Hayden, L.; Braaten, D.

    2004-12-01

    Antarctica is a key element in Earth's climatic and geodynamic systems, yet on the eve of the 50th anniversary of the International Geophysical Year, we lack fundamental geologic and geophysical data from the deep interior of this vast continent. Despite the central role that Antarctica has played in shaping the present global environment, fundamental, first-order parameters such as ice volume and stratigraphy, bedrock elevation, lithology, structure, age, and tectonic history remain poorly known over large portions of the continent, including the Gamburtsev Subglacial Mountains. Given the extensive ice cover, airborne geophysical data is the best and most cost-effective method to characterize broad areas of sub-ice basement and expand our knowledge of Antarctica. Under a program entitled, GAMBIT--Gamburtsev Aerogeophysical Mapping of Bedrock and Ice Targets, we propose to conduct airborne gravity, magnetic and radar surveys over the Gamburtsev Subglacial Mountains, a priority for geophysical and drilling studies by the solid Earth and glaciology communities for many years. This proposal will help develop long-range aerogeophysical capabilities and provide data to the Antarctic community within a year after collection to help answer fundamental science questions of global significance. By integrating these with international efforts during the IPY, we can maximize and broaden the use of all data sets. Specifically, we propose to image the East Antarctic ice sheet and bedrock with airborne geophysical surveys through the GAMBIT project in order to: 1) determine ice volume for mass balance calculations and identify internal layers reflecting the accumulation history of the East Antarctic ice sheet in the Gamburtsev Subglacial Mountains region; 2) characterize the gravity, magnetic, and elevation signatures of the East Antarctic crustal basement of the Gamburtsev Subglacial Mountains; 3) integrate these data with existing and new data collected during IPY over

  3. New constraints on the structure and dynamics of the East Antarctic Ice Sheet from the joint IPY/Ice Bridge ICECAP aerogeophysical project

    NASA Astrophysics Data System (ADS)

    Blankenship, D. D.; Young, D. A.; Siegert, M. J.; van Ommen, T. D.; Roberts, J. L.; Wright, A.; Warner, R. C.; Holt, J. W.; Young, N. W.; Le Meur, E.; Legresy, B.; Cavitte, M.; Icecap Team

    2010-12-01

    Ice within marine basins of East Antarctica, and their outlets, represent the ultimate limit on sea level change. The region of East Antarctica between the Ross Sea and Wilkes Land hosts a number of major basin, but has been poorly understood. Long range aerogeophysics from US, Australian and French stations, with significant British and IceBridge support, has, under the banner of the ICECAP project, greatly improved our knowledge of ice thickness, surface elevation, and crustal structure of the Wilkes and Aurora Subglacial Basins, as well as the Totten Glacier, Cook Ice Shelf, and Byrd Glacier. We will discuss the evolution of the Wilkes and Aurora Subglacial Basins, new constraints on the geometry of the major outlet glaciers, as well as our results from surface elevation change measurements over dynamic regions of the ice sheet. We will discuss the implications of our data for the presence of mid Pleistocene ice in central East Antarctica. Future directions for ICECAP will be discussed.

  4. Aerogeophysical evidence for complex subglacial geology below the Rutford drainage basin,WestAntarctica

    NASA Astrophysics Data System (ADS)

    Jones, P.; Ferraccioli, F.; Corr, H.; Smith, A. M.; King, E.; Vaughan, D.

    2003-12-01

    A significant part of the West Antarctic Ice Sheet appears to be imposed upon a complex and still largely unknown continental rift system, perhaps featuring sedimentary basins, thin crust and high heat flow. Subglacial geology has been postulated to strongly modulate the dynamics and stability of the ice sheet itself. Specifically, recent aerogeophysics collected over central West Antarctica at edge of the Whitmore Mountains crustal block show that narrow subglacial rift basins with thick sedimentary infill may control the onsets and lateral margins of ice streams. The British Antarctic Survey flew an aerogeophysical survey during the 2001-02 field season: the main aim was to investigate what factors control the location and dynamics of the onset region of the Rutford Ice stream. Airborne radar, aerogravity and aeromagnetic data were simultaneously collected over the drainage basin of the Rutford Ice Stream. The new bedrock elevation grid for the area shows that the Rutford Ice Stream is constrained by a deep bedrock trough with a N-S to NE-SW trend. The onset region appears however to lie within an E-W bedrock trough at the edge of the Ellsworth Mountains crustal block. Bouguer gravity maps do not reveal typical signatures for a coincident deep rift basin at this location. However, a sharp NE-SW trending gradient, likely separating crustal blocks with contrasting crustal thickness is revealed. Aeromagnetic data image NE-SW trends north of the Rutford Ice Stream. In the onset region, these trends appear to be truncated by a NNW-SSE trend, lying on strike with the Ellsworth Mountains. Hence, the new aerogeophysical data suggests greater complexity in the subglacial geology and structure of an onset region of an ice stream compared to previous investigations.

  5. Crustal architecture and tectonic evolution in the South Pole frontier, East Antarctica, in light of recent aerogeophysical observations

    NASA Astrophysics Data System (ADS)

    Ferraccioli, Fausto; Jordan, Tom; Forsberg, Rene; Olesen, Arne; Eagles, Graeme; Matsuoka, Kenichi; Casal, Tania

    2017-04-01

    Our knowledge of interior East Antarctica has increased significantly in recent years, aided by major aerogeophysical exploration efforts conducted by the geosciences community since the International Polar Year. Aerogeophysical and satellite imaging is helping unveil cryptic crustal provinces and this is enabling new studies of the major tectonic process that shaped East Antarctica through the supercontinent cycle (e.g. Ferraccioli et al., 2011, Nature; Aitken et al., 2014, GRL). However, the South Pole itself has remained one of the largest "poles of ignorance", as very little data have been acquired here since pioneering aerogeophysical surveys performed in the 1970's and a single more detailed US survey flown in the late 1990's from the Transantarctic Mountains to South Pole (Studinger et al., 2006, EPSL). During the 2015-2016 Antarctic campaign we flew a major aerogeophysical survey over the South Pole frontier, collecting ca 30,000 line km of new radio echo sounding, laser altimetry, airborne gravity and aeromagnetic data. The main aim of the PolarGAP project, supported by the European Space Agency was to fill in the data void in GOCE (Gravity Field and Steady-State Ocean Circulation Explorer) satellite gravity south of 83.3°S. Here we present the new ice thickness, bedrock topography, and gravity and magnetic anomaly images derived from the survey and interpret them to investigate the crustal architecture and tectonic evolution of the South Pole region. The Free-air gravity and radar data reveal the form and extent of the Pensacola-Pole Subglacial Basin that stretches from the Weddell Sea to South Pole. Linear free-air gravity lows within the basin are interpreted here as a system of glacially overdeepened grabens flanked by uplifted horst blocks, including the Pensacola Mountains, Patuxent Range and the Argentine Range. The grabens are inferred to be linked to the Jurassic Transantarctic rift system, which at regional to continental-scale, is associated

  6. Subglacial sedimentary basin characterization of Wilkes Land, East Antarctica via applied aerogeophysical inverse methods

    NASA Astrophysics Data System (ADS)

    Frederick, B. C.; Gooch, B. T.; Richter, T.; Young, D. A.; Blankenship, D. D.; Aitken, A.; Siegert, M. J.

    2013-12-01

    Topography, sediment distribution and heat flux are all key boundary conditions governing the stability of the East Antarctic ice sheet (EAIS). Recent scientific scrutiny has been focused on several large, deep, interior EAIS basins including the submarine basal topography characterizing the Aurora Subglacial Basin (ASB). Numerical ice sheet models require accurate deformable sediment distribution and lithologic character constraints to estimate overall flow velocities and potential instability. To date, such estimates across the ASB have been derived from low-resolution satellite data or historic aerogeophysical surveys conducted prior to the advent of GPS. These rough basal condition estimates have led to poorly-constrained ice sheet stability models for this remote 200,000 sq km expanse of the ASB. Here we present a significantly improved quantitative model characterizing the subglacial lithology and sediment in the ASB region. The product of comprehensive ICECAP (2008-2013) aerogeophysical data processing, this sedimentary basin model details the expanse and thickness of probable Wilkes Land subglacial sedimentary deposits and density contrast boundaries indicative of distinct subglacial lithologic units. As part of the process, BEDMAP2 subglacial topographic results were improved through the additional incorporation of ice-penetrating radar data collected during ICECAP field seasons 2010-2013. Detailed potential field data pre-processing was completed as well as a comprehensive evaluation of crustal density contrasts based on the gravity power spectrum, a subsequent high pass data filter was also applied to remove longer crustal wavelengths from the gravity dataset prior to inversion. Gridded BEDMAP2+ ice and bed radar surfaces were then utilized to establish bounding density models for the 3D gravity inversion process to yield probable sedimentary basin anomalies. Gravity inversion results were iteratively evaluated against radar along-track RMS deviation and

  7. Equilibrium and Disequilibrium of River Basins: Effects on Stream Captures in Serra do Mar and Serra da Mantiqueira, Brazil

    NASA Astrophysics Data System (ADS)

    DA Silva, L. M.

    2015-12-01

    Landscapes are mainly driven by river processes that control the dynamic reorganization of networks. Discovering and identifying whether river basins are in geometric equilibrium or disequilibrium requires an analysis of water divides, channels that shift laterally or expand upstream and river captures. Issues specifically discussed include the variation of drainage area change and erosion rates of the basins. In southeastern Brazil there are two main escarpments with extensive geomorphic surfaces: Serra do Mar and Serra da Mantiqueira Mountains. These landscapes are constituted of Neoproterozoic and early Paleozoic rocks, presenting steep escarpments with low-elevation coastal plains and higher elevation interior plateaus. To identify whether river basins and river profiles are in equilibrium or disequilibrium in Serra do Mar and Serra da Mantiqueira Mountains, we used the proxy (χ), evaluating the effect of drainage area change and erosion rates. We selected basins that drain both sides of these two main escarpments (oceanic and continental sides) and have denudation rates derived from pre-existing cosmogenic isotopes data (Rio de Janeiro, Paraná and Minas Gerais). Despite being an ancient and tectonically stable landscape, part of the coastal plain of Serra do Mar Mountain in Rio de Janeiro and Paraná is in geometric disequilibrium, with water divides moving in the direction of higher χ values. To achieve equilibrium, some basins located in the continental side are retracting and disappearing, losing area to the coastal basins. On the contrary, there are some adjacent sub-basins that are close to equilibrium, without strong contrasts in χ values. The same pattern was observed in Serra da Mantiqueira (Minas Gerais state), with stream captures and river network reorganization in its main rivers. The initial results suggest a strong contrast between erosion rates in the continental and the oceanic portions of the escarpments.

  8. 76 FR 10936 - Culturally Significant Objects Imported for Exhibition Determinations: “Richard Serra Drawing: A...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... DEPARTMENT OF STATE [Public Notice: 7348] Culturally Significant Objects Imported for Exhibition Determinations: ``Richard Serra Drawing: A Retrospective'' SUMMARY: Notice is hereby given of the following... objects to be included in the exhibition ``Richard Serra Drawing: A Retrospective,'' imported from abroad...

  9. Aerogeophysical evidence for active volcanism beneath the West Antarctic Ice Sheet

    NASA Technical Reports Server (NTRS)

    Blankenship, Donald D.; Bell, Robin E.; Hodge, Steven M.; Brozena, John M.; Behrendt, John C.

    1993-01-01

    Although it is widely understood that the collapse of the West Antarctic Ice Sheet (WAIS) would cause a global sea-level rise of 6 m, there continues to be considerable debate about the response of this ice sheet to climate change. The stability of the WAIS, which is characterized by a bed grounded well below sea level, may depend on geologically controlled conditions at the base, which are independent of climate. Ice streams moving up to 750 m/yr disperse material from the interior through to the oceans. As these ice streams tend to buffer the reservoir of slow-moving inland ice from exposure to oceanic degradation, understanding the ice-streaming process is important for evaluating WAIS stability. There is strong evidence that ice streams slide on a lubricating layer of water-saturated till. Development of this basal layer requires both water and easily eroded sediments. Active lithospheric extension may elevate regional heat flux, increase basal melting, and trigger ice streaming. If a geologically defined boundary with a sharp contrast in geothermal flux exists beneath the WAIS, ice streams may only be capable of operating as a buffer over a restricted region. Should ocean waters penetrate beyond this boundary, the ice-stream buffer would disappear, possibly triggering a collapse of the inland ice reservoir. Aerogeophysical evidence for active volcanism and elevated heat flux beneath the WAIS near the critical region where ice streaming begins is presented.

  10. Inland extent of the Weddell Sea Rift imaged by new aerogeophysical data

    NASA Astrophysics Data System (ADS)

    Jordan, Tom A.; Ferraccioli, Fausto; Ross, Neil; Corr, Hugh F. J.; Leat, Philip T.; Bingham, Rob G.; Rippin, David M.; le Brocq, Anne; Siegert, Martin J.

    2013-02-01

    The Weddell Sea Rift was a major focus for Jurassic extension and magmatism during the early stages of Gondwana break-up and underlies the Weddell Sea Embayment, which separates East Antarctica from a collage of crustal blocks in West Antarctica. Newly-collected aerogeophysical data over the catchments of Institute and Möller ice streams reveal the inland extent of the Weddell Sea Rift against the Ellsworth-Whitmore block and a hitherto unknown major left-lateral strike slip boundary between East and West Antarctica. Aeromagnetic and gravity anomalies define the regional subglacial extent of Proterozoic basement, Middle Cambrian rift-related volcanic rocks, Jurassic intrusions and sedimentary rocks of inferred post-Jurassic age. 2D and 3D magnetic depth-to-source estimates were used to help constrain joint magnetic and gravity models for the region. The models reveal that Proterozoic crust similar to that exposed at Haag Nunataks, extends southeast of the Ellsworth Mountains to the margin of the Coastal Basins. Thick granitic Jurassic intrusions are modelled at the transition between the Ellsworth-Whitmore block and the thinner crust of the Weddell Sea Rift and within the Pagano Shear Zone. The crust beneath the inland extension of the Weddell Sea Rift is modelled as being either ~ 4 km thinner compared to the adjacent Ellsworth-Whitmore block or as underlain by an up to 8 km thick mafic underplate.

  11. New Aerogeophysical exploration of the Gamburtsev Province (East Antarctica)

    NASA Astrophysics Data System (ADS)

    Ferraccioli, F.; Bell, R. E.; Studinger, M.; Damaske, D.; Jordan, T. A.; Corr, H.; Braaten, D. A.; Gogineni, P. S.; Fahnestock, M. A.; Finn, C.; Rose, K.

    2009-12-01

    The enigmatic Gamburstev Subglacial Mountains (GSM) in the interior of East Antarctica, have remained the least understood mountain range on earth, since their discovery some 50 years ago. An improved knowledge of the GSM region is however essential to underpin reconstructions of the Antarctic cryosphere and climate evolution. The GSM are a key nucleation site for the inception of the East Antarctic Ice Sheet approximately 34 Ma ago, and the adjacent Lambert Glacier played a pivotal role for ice sheet dynamics throughout the Neogene (23-0 Ma). The GSM province may also provide tectonic controls for major subglacial lakes flanking the range. In addition, the ice encasing the GSM province has been inferred to contain the oldest detailed climate record of the planet, a prime target for future deep ice core drilling. With the overarching aim of accomplishing the first systematic study of the cryosphere and lithosphere of the GSM province we launched a new geophysical exploration effort- AGAP (Antarctica’s Gamburtsev Province)-, a flagship programme of the International Polar Year. The aerogeophysical and seismology components of AGAP were accomplished by pooling resources from 7 nations. We deployed 2 Twin Otters, equipped with state-of-the art geophysical instrumentation and operating from two remote field camps on either side of Dome A. Over 120,000 line-km of new airborne radar, laser, aerogravity and aeromagnetic data survey were collected during the 2008/09 field campaign. Our grids of ice surface, ice thickness, subglacial topography, and gravity and magnetic anomalies provide a new geophysical foundation to analyse the GSM province, from the surface of the East Antarctic Ice Sheet down to mantle depths beneath the Precambrian shield. The anomalously high-elevation, alpine-type landscape of the GSM is now mapped with unprecedented detail. Two distinct branches of a subglacial rift system are imaged along the north-western and north-eastern margins of the

  12. A long-term perspective on biomass burning in the Serra da Estrela, Portugal

    NASA Astrophysics Data System (ADS)

    Connor, Simon E.; Araújo, João; van der Knaap, Willem O.; van Leeuwen, Jacqueline F. N.

    2012-11-01

    Fire is currently perceived as a major threat to ecosystems and biodiversity in the mountains of the Mediterranean region. Portugal's highest mountain range, the Serra da Estrela, is one of the country's most important protected areas and also the most fire-prone. We present a ˜14,000-year fire history based on microscopic charred particles in an infilled glacial lake to better understand the antiquity of biomass burning and its effects on Mediterranean vegetation at the Atlantic margin. Results indicate the continuous occurrence of fire in the Serra da Estrela over the period of the record. Two periods of increased fire activity - around 12,000-11,000 calendar years before the present (cal. a BP) and 3500-2500 cal. a BP - were accompanied by major vegetation changes and followed by long periods of vegetation stabilisation. Cross-correlation analyses reveal that post-fire succession consistently began with herbaceous vegetation, followed by forest and shrubland stages. Past successional trends were often markedly different to those observed at present. Holocene climatic changes, including shifts in the North Atlantic Oscillation, played a pivotal role in the vegetation development and fire history of the Serra da Estrela. In the late Holocene, human use of fire became a major agent of vegetation change, accelerating the Holocene decline of forests.

  13. Serra Pelada: the first Amazonian Meteorite fall is a Eucrite (basalt) from Asteroid 4-Vesta.

    PubMed

    Zucolotto, Maria Elizabeth; Tosi, Amanda A; Villaça, Caio V N; Moutinho, André L R; Andrade, Diana P P; Faulstich, Fabiano; Gomes, Angelo M S; Rios, Debora C; Rocha, Marcilio C

    2018-01-01

    Serra Pelada is the newest Brazilian eucrite and the first recovered fall from Amazonia (State of Pará, Brazil, June 29th 2017). In this paper, we report on its petrography, chemistry, mineralogy and its magnetic properties. Study of four thin sections reveals that the meteorite is brecciated, containing basaltic and gabbroic clasts, as well of recrystallized impact melt, embedded into a fine-medium grained matrix. Chemical analyses suggest that Serra Pelada is a monomict basaltic eucritic breccia, and that the meteorite is a normal member of the HED suite. Our results provide additional geological and compositional information on the lithological diversity of its parent body. The mineralogy of Serra Pelada consists basically of low-Ca pyroxene and high-Ca plagioclase with accessory minerals such as quartz, sulphide (troilite), chromite - ulvöspinel and ilmenite. These data are consistent with the meteorite being an eucrite, a basaltic achondrite and a member of the howardite-eucrite-diogenite (HED) clan of meteorites which most likely are from the crust asteroid 4 Vesta.

  14. Age distribution of Serra Geral (Paraná) flood basalts, southern Brazil

    USGS Publications Warehouse

    Fodor, R.V.; McKee, E.H.; Roisenberg, A.

    1989-01-01

    We evaluated 193 K-Ar ages (10 newly determined) of basaltic and differentiated rocks of the Serra Geral (Paraná) flood-basalt province for indications of magmatism occurring systematically with progressive rifting and complete separation ( ≈130-105 Ma) of South America from Africa. The K-Ar ages represent basalt emplacement between 35° and 19°S covering about 1,200,000 km2. We note that volcanism appears ubiquitous across the province between about 140 and 115 Ma, and that there are no significant age differences within that relate directly to progressive south-to-north tectonism. On the other hand, the oldest samples, about 140–160 Ma, are among those nearest the Brazil coastline (rift margin), perhaps suggesting migration of activity away from the rift with time. Studies of other flood-basalt provinces now indicate short (<3 m.y.) eruption periods, thereby pointing to the need for re-examination of Serra Geral ages by 40Ar-39Ar incremental heating techniques.

  15. Development of a benthic multimetric index for the Serra da Bocaina bioregion in Southeast Brazil.

    PubMed

    Baptista, D F; Henriques-Oliveira, A L; Oliveira, R B S; Mugnai, R; Nessimian, J L; Buss, D F

    2013-08-01

    Brazil faces a challenge to develop biomonitoring tools to be used in water quality assessment programs, but few multimetric indices were developed so far. This study is part of an effort to test and implement programs using benthic macroinvertebrates as bioindicators in Rio de Janeiro State. Our aim was first to test the Multimetric Index for Serra dos Órgãos (SOMI) for a different area--Serra da Bocaina (SB)--in the same ecoregion. We sampled 27 streams of different sizes and altitudes in the SB region. Despite the environmental similarities, results indicated biological differences between reference sites of the two regions. Considering these differences, we decided to develop an index specific for the SB region, the Serra da Bocaina Multimetric Index (MISB). We tested twenty-two metrics for sensitivity to impairment and redundancy, and six metrics were considered valid to integrate the MISB: Family Richness, Trichoptera Richness, % Coleoptera, % Diptera, IBE-IOC index, EPT / Chironomidae ratio. A test of the MISB in eleven sites indicated it was more related to land-use and water physico-chemical parameters than with altitude or stream width, being a useful tool for the monitoring and assessment of streams in the bioregion.

  16. Pyroxenes in Serra de Mage - Cooling history in comparison with Moama and Moore County

    NASA Technical Reports Server (NTRS)

    Harlow, G. E.; Prinz, M.; Nehru, C. E.; Taylor, G. J.; Keil, K.

    1979-01-01

    Thin sections and single grains of pyroxenes from the Serra de Mage feldspar cumulate eucrites were studied by X-ray crystallography, electron microprobe and optical techniques. It was concluded that the pyroxene crystallized as pigeonite. On cooling augite was exsolved along (001) and inverted to hypersthene, with exsolution of (100) augite from hypersthene during continued slow cooling. The estimated original bulk composition of the pigeonite pyroxene is Wo10En51Fs39. The compositional data, textural relations, and existence of P2 sub 1 ca hypersthene suggest very low cooling (about 0.0004 deg C/year) below 800 deg. The Serra de Mage augite lamellae were found to be as thick or thicker than those of Moore County and Moama meteorites.

  17. Jurassic magmatism in Dronning Maud Land: synthesis of results of the MAMOG project

    USGS Publications Warehouse

    Leat, P.T.; Curtis, M.L.; Riley, T.R.; Ferraccioli, F.

    2007-01-01

    The Jurassic Karoo large igneous province (LIP) of Antarctica, and its conjugate margin in southern Africa, is critical for investigating important questions about the relationship of basaltic LIPs to mantle plumes. Detailed aerogeophysical, structural, anisotropy of magnetic susceptibility (AMS), geochronological and geochemical investigations completed under the British Antarctic Survey’s MAMOG project have provided some of the answers. Across most of the area, magma volumes were small compared to those in southern Africa. Jurassic dikes intruding the Archean craton are sparse and the Jutulstraumen trough, a Jurassic rift, is interpreted, from aerogeophysical data, as largely amagmatic. The largest volumes of magma were emplaced along the margin of the craton and close to the Africa-Antarctica rift. Although dikes were emplaced by both vertical and horizontal flow, overwhelmingly magmas in Dronning Maud Land were locally derived, and not emplaced laterally from distant sources. Basaltic magmatism was protracted in Dronning Maud Land (several dike emplacement episodes between ~206 and 175 Ma), and the small magma volumes resulted in highly diverse magma compositions, including picrites and ferropicrites interpreted to have been derived from hot mantle in a mantle plume. The protracted magmatism before the locally ~177 Ma flood lava eruptions, and evidence for a radiating dike swarm, favor a model of mantle plume incubation for 20-30 million years before flood lava eruption.

  18. Impacts of the Conservation Education Program in Serra Malagueta Natural Park, Cape Verde

    ERIC Educational Resources Information Center

    Burnett, Edmund; Sills, Erin; Peterson, M. Nils; DePerno, Christopher

    2016-01-01

    Environmental and conservation education programs are commonly offered in the rapidly expanding network of protected areas in developing countries. There have been few evaluations of these programs and their impacts on participants. At Serra Malagueta Natural Park in Cape Verde, we assessed changes in environmental knowledge, opinions, and…

  19. Amphibians of Serra Bonita, southern Bahia: a new hotpoint within Brazil's Atlantic Forest hotspot.

    PubMed

    Dias, Iuri Ribeiro; Medeiros, Tadeu Teixeira; Vila Nova, Marcos Ferreira; Solé, Mirco

    2014-01-01

    We studied the amphibian community of the Private Reserve of Natural Heritage (RPPN) Serra Bonita, an area of 20 km(2) with steep altitudinal gradients (200-950 m a.s.l.) located in the municipalities of Camacan and Pau-Brasil, southern Bahia State, Brazil. Data were obtained at 38 sampling sites (including ponds and transects within the forest and in streams), through active and visual and acoustic searches, pitfall traps, and opportunistic encounters. We recorded 80 amphibian species distributed in 15 families: Aromobatidae (1), Brachycephalidae (3), Bufonidae (4), Centrolenidae (2), Ceratophryidae (1), Craugastoridae (7), Eleutherodactylidae (2), Hemiphractidae (2), Hylidae (42), Hylodidae (1), Leptodactylidae (7), Microhylidae (3), Siphonopidae (1), Odontophrynidae (3) and Pipidae (1). Species richness was positively correlated with monthly rainfall. Near 36% of the species were found in strictly forest environments, 15% are endemic to Bahia State and 77.2% are endemic to the Atlantic Forest biome. The large species diversity of this small area, the high degree of endemism and the taxonomic and biogeographic significance turn the Serra Bonita mountain into a hotpoint for amphibians within Brazil's Atlantic Forest hotspot.

  20. Larva and pupa of Ctesias (s. str.) serra (Fabricius, 1792) with remarks on biology and economic importance, and larval comparison of co-occurring genera (Coleoptera, Dermestidae).

    PubMed

    Kadej, Marcin

    2018-01-01

    Updated descriptions of the last larval instar (based on the larvae and exuviae) and first detailed description of the pupa of Ctesias (s. str.) serra (Fabricius, 1792) (Coleoptera: Dermestidae) are presented. Several morphological characters of C. serra larvae are documented: antenna, epipharynx, mandible, maxilla, ligula, labial palpi, spicisetae, hastisetae, terga, frons, foreleg, and condition of the antecostal suture. The paper is fully illustrated and includes some important additions to extend notes for this species available in the references. Summarised data about biology, economic importance, and distribution of C. serra are also provided. The comparison of larval characteristics for some of the genera of Dermestidae co-occurring with Ctesias is presented. A key for identification of these genera is also provided.

  1. The kinematic evolution of the Serra Central Salient, Eastern Brazil: A Neoproterozoic progressive arc in northern Espinhaço fold-thrust belt

    NASA Astrophysics Data System (ADS)

    Bersan, Samuel Moreira; Danderfer, André; Lagoeiro, Leonardo; Costa, Alice Fernanda de Oliveira

    2017-12-01

    Convex-to-the-foreland map-view curves are common features in fold-thrust belts around cratonic areas. These features are easily identifiable in belts composed of supracrustal rocks but have been rarely described in rocks from relatively deeper crustal levels where plastic deformation mechanisms stand out. Several local salients have been described in Neoproterozoic marginal fold-thrust belts around the São Francisco craton. In the northern part of the Espinhaço fold-thrust belt, which borders the eastern portion of the São Francisco craton, both Archean-Paleoproterozoic basement rocks and Proterozoic cover rocks are involved in the so-called Serra Central salient. A combination of conventional structural analysis and microstructural and paleostress studies were conducted to characterize the kinematic and the overall architecture and processes involved in the generation of this salient. The results allowed us to determine that the deformation along the Serra Central salient occur under low-grade metamorphic conditions and was related to a gently oblique convergence with westward mass transport that developed in a confined flow, controlled by two transverse bounding shear zones. We propose that the Serra Central salient nucleates as a basin-controlled primary arc that evolves to a progressive arc with secondary vertical axis rotation. This secondary rotation, well-illustrated by the presence of two almost orthogonal families of folds, was dominantly controlled by buttress effect exert by a basement high located in the foreland of the Serra Central salient.

  2. Amphibians of Serra Bonita, southern Bahia: a new hotpoint within Brazil’s Atlantic Forest hotspot

    PubMed Central

    Dias, Iuri Ribeiro; Medeiros, Tadeu Teixeira; Vila Nova, Marcos Ferreira; Solé, Mirco

    2014-01-01

    Abstract We studied the amphibian community of the Private Reserve of Natural Heritage (RPPN) Serra Bonita, an area of 20 km2 with steep altitudinal gradients (200–950 m a.s.l.) located in the municipalities of Camacan and Pau-Brasil, southern Bahia State, Brazil. Data were obtained at 38 sampling sites (including ponds and transects within the forest and in streams), through active and visual and acoustic searches, pitfall traps, and opportunistic encounters. We recorded 80 amphibian species distributed in 15 families: Aromobatidae (1), Brachycephalidae (3), Bufonidae (4), Centrolenidae (2), Ceratophryidae (1), Craugastoridae (7), Eleutherodactylidae (2), Hemiphractidae (2), Hylidae (42), Hylodidae (1), Leptodactylidae (7), Microhylidae (3), Siphonopidae (1), Odontophrynidae (3) and Pipidae (1). Species richness was positively correlated with monthly rainfall. Near 36% of the species were found in strictly forest environments, 15% are endemic to Bahia State and 77.2% are endemic to the Atlantic Forest biome. The large species diversity of this small area, the high degree of endemism and the taxonomic and biogeographic significance turn the Serra Bonita mountain into a hotpoint for amphibians within Brazil’s Atlantic Forest hotspot. PMID:25408616

  3. Checklist of butterflies (Insecta: Lepidoptera) from Serra do Intendente State Park - Minas Gerais, Brazil

    PubMed Central

    Nery, Izabella; Carvalho, Natalia

    2014-01-01

    Abstract In order to contribute to the butterflies’ biodiversity knowledge at Serra do Intendente State Park - Minas Gerais, a study based on collections using Van Someren-Rydon traps and active search was performed. In this study, a total of 395 butterflies were collected, of which 327 were identified to species or morphospecies. 263 specimens were collected by the traps and 64 were collected using entomological hand-nets; 43 genera and 60 species were collected and identified. PMID:25535482

  4. Paleoenvironmental significance of Holocene widespread deposition of continental carbonates in Serra da Bodoquena, West-central Brazil

    NASA Astrophysics Data System (ADS)

    Sallun Filho, W.; Ribeiro, L. M. A. L.; Sawakuchi, A. O.; Boggiani, P. C.

    2016-12-01

    Continental carbonates are used in paleoenvironmental reconstructions in several parts of the world. Tufas and unconsolidated micrites can provide valuable information about the environmental conditions during the period of deposition. When the deposits are discontinuous, their presence is evidence of a wet period with conditions that are favourable to deposition; the deposits can be a record of the hydrologic systems and paleoclimate of the period of deposition. Discontinuous periods of deposition could also indicate changes in hydrological conditions that were independent of changes in climate, such as by temporary activity of springs or changes in a river's position. Deposits of continental carbonates in Brazil are rare, but in the State of Mato Grosso do Sul, there are extensive deposits, especially in the Serra da Bodoquena karst area, which form expansive plains of unconsolidated micrite and phytohermal fluvial tufa. These deposits are collectively called the Serra da Bodoquena Formation. New radiocarbon and OSL ages confirm the Holocene as the age of The Serra da Bodoquena Formation which shows periods of more extensive deposition than today. Well-dated deposits of unconsolidated micrites from paleolakes indicate a deposition that occurred approximately 6,500 to 2,000 years BP. These deposits can be identified by their smooth textures, as compared to surrounding karst areas. Over the paleolake deposits, there are phytohermal tufas that can be identified adjacent to present-day fluvial channels, presenting irregular winding arcs and relict fluvial channels. These arcs correspond to the edges of ancient tufa dams. One ancient and inactive dam have radiocarbon ages between 680 and 895 cal years AD. Apparently, there was a distinct lack of deposition between approximately 2,000 and 1,270 years BP, after which the deposition is continuous. Younger radiocarbon ages of 670 to 550 cal years BP are found in terrace tufa deposits (present-day river channel). This work

  5. Criteria for recognition and taphonomy of coprolites from the Serra da Galga Member, Marília Formation (Upper Cretaceous), Minas Gerais, Brazil

    NASA Astrophysics Data System (ADS)

    de Oliveira, Fábio Antônio; Santucci, Rodrigo Miloni

    2017-10-01

    The Cretaceous sedimentary rocks from Uberaba, Minas Gerais, have provided a rich vertebrate fauna unearthed from rocks of the Serra da Galga Member, Marília Formation, Bauru Group, of Maastrichtian age. Together with these fossils, a large number of coprolites have also been found from two main localities, here called the Peirópolis and Serra da Galga sites. During field trips carried out in the last few years, 340 samples have been collected, prepared, and analyzed in laboratory. By using parameters such as weight, density, mineralogical composition, and content, we identified 199 coprolites and 141 inorganic nodules (pseudocoprolites). The coprolites have been divided into four morphotypes, which suggest their producers varied in feeding strategies and size. The taphonomic study, based on morphological characters such as wear, presence of pebbles or pebble marks, and desiccation cracks, suggests they underwent temporal and spatial-mixing, and that the material from the Peirópolis Site were transported essentially by alluvial processes (alluvial fans), whereas the material from the Serra da Galga Site were reworked mainly by fluvial streams. The same taphonomic processes may well have affected other fossils from these sites, which are highly abundant in the rocks of this area. Because of that, this taphonomic aspect becomes an important parameter to be taken into account in future studies on the biota of the region.

  6. New Collaborative Aerogeophysical Survey Targets the Stability of the East Antarctic Ice sheet and its Geological Boundary Conditions

    NASA Astrophysics Data System (ADS)

    Ferraccioli, F.; Corr, H.; Jordan, T.; Bozzo, E.; Armadillo, E.; Caneva, G.; Frearson, N.; Robinson, C.; Smellie, J.

    2006-12-01

    At the eve of the IPY large aerogeophysical survey data gaps still remain over the East Antarctic Ice Sheet (EAIS). This is due to the logistic and environmental challenges involved in exploration over these areas. During the 2005/06 Antarctic field season the British Antarctic Survey (BAS) collaborated with the University of Genoa to accomplish an extensive airborne geophysical survey over the EAIS. We explored the enigmatic Wilkes Subglacial Basin (WSB) and the adjacent Transantarctic Mountains (TAM). Over 60,000-line km of new data were collected during 70 survey flights. 270 hours of dedicated science flying and 45 hours of positioning and calibration flying were performed. The Italian Antarctic Programme provided the logistic support and aviation fuel at Mario Zucchelli Station, Mid-Point, and at two remote field camps, Talos Dome and Sitry. Additional support and fuel was provided at Dome C, as part of a separate trilateral UK/Italian and French agreement to survey some of the subglacial lakes, which characterise this region. The airborne survey platform was a BAS Twin Otter, equipped with airborne radar, aeromagnetic and airborne gravity sensors. We present key new datasets on ice surface, ice thickness, bedrock configurations, airborne gravity and aeromagnetic anomalies. These new data will assist in addressing four major open questions: 1) Are there Cenozoic marine sediments in the WSB, linked to controversial deglaciation over this part of the EAIS?; 2) What is the tectonic origin and deep structure of the WSB and TAM?; 3) Is there major segmentation of the TAM?, 4) what forcings and feedbacks were involved for the EAIS and for climate evolution?.

  7. Integrative overview of the herpetofauna from Serra da Mocidade, a granitic mountain range in northern Brazil.

    PubMed

    Moraes, Leandro J C L; de Almeida, Alexandre P; de Fraga, Rafael; Rojas, Rommel R; Pirani, Renata M; Silva, Ariane A A; de Carvalho, Vinícius T; Gordo, Marcelo; Werneck, Fernanda P

    2017-01-01

    The Brazilian mountain ranges from the Guiana Shield highlands are largely unexplored, with an understudied herpetofauna. Here the amphibian and reptile species diversity of the remote Serra da Mocidade mountain range, located in extreme northern Brazil, is reported upon, and biogeographical affinities and taxonomic highlights are discussed. A 22-days expedition to this mountain range was undertaken during which specimens were sampled at four distinct altitudinal levels (600, 960, 1,060 and 1,365 m above sea level) using six complementary methods. Specimens were identified through an integrated approach that considered morphological, bioacoustical, and molecular analyses. Fifty-one species (23 amphibians and 28 reptiles) were found, a comparable richness to other mountain ranges in the region. The recorded assemblage showed a mixed compositional influence from assemblages typical of other mountain ranges and lowland forest habitats in the region. Most of the taxa occupying the Serra da Mocidade mountain range are typical of the Guiana Shield or widely distributed in the Amazon. Extensions of known distribution ranges and candidate undescribed taxa are also recorded. This is the first herpetofaunal expedition that accessed the higher altitudinal levels of this mountain range, contributing to the basic knowledge of these groups in remote areas.

  8. Integrative overview of the herpetofauna from Serra da Mocidade, a granitic mountain range in northern Brazil

    PubMed Central

    Moraes, Leandro J.C.L.; de Almeida, Alexandre P.; de Fraga, Rafael; Rojas, Rommel R.; Pirani, Renata M.; Silva, Ariane A.A.; de Carvalho, Vinícius T.; Gordo, Marcelo; Werneck, Fernanda P.

    2017-01-01

    Abstract The Brazilian mountain ranges from the Guiana Shield highlands are largely unexplored, with an understudied herpetofauna. Here the amphibian and reptile species diversity of the remote Serra da Mocidade mountain range, located in extreme northern Brazil, is reported upon, and biogeographical affinities and taxonomic highlights are discussed. A 22-days expedition to this mountain range was undertaken during which specimens were sampled at four distinct altitudinal levels (600, 960, 1,060 and 1,365 m above sea level) using six complementary methods. Specimens were identified through an integrated approach that considered morphological, bioacoustical, and molecular analyses. Fifty-one species (23 amphibians and 28 reptiles) were found, a comparable richness to other mountain ranges in the region. The recorded assemblage showed a mixed compositional influence from assemblages typical of other mountain ranges and lowland forest habitats in the region. Most of the taxa occupying the Serra da Mocidade mountain range are typical of the Guiana Shield or widely distributed in the Amazon. Extensions of known distribution ranges and candidate undescribed taxa are also recorded. This is the first herpetofaunal expedition that accessed the higher altitudinal levels of this mountain range, contributing to the basic knowledge of these groups in remote areas. PMID:29302235

  9. The snake community of Serra do Mendanha, in Rio de Janeiro State, southeastern Brazil: composition, abundance, richness and diversity in areas with different conservation degrees.

    PubMed

    Pontes, J A L; Pontes, R C; Rocha, C F D

    2009-08-01

    We studied and compared parameters of the snake community of the Serra do Mendanha, Rio de Janeiro State, southeastern Brazil (22 degrees 48'-22 degrees 51' S and 43 degrees 31'-43 degrees 28' W), such as: abundance distribution, richness, species diversity and biomass, between forested areas, areas under regeneration and agriculture areas (banana plantations); to obtain information about the natural history and facilitate the development of future research. For capturing the snakes we used: pitfall traps, drift-fences and visual search (diurnal and nocturnal) along four transects for each habitat. The captured snakes were measured with a tape and caliper, weighed with dynamometers and sexed with the use of a catheter. The animals marked (with ventral scales cut) were released for posterior recapture. One individual per species was fixed and deposited at the Museu Nacional, Rio de Janeiro. We undertook an effort of 840 man/hour, and captured a total of 207 snakes belonging to 25 species (Colubridae 80.2%, Elapidae 12.6%, Viperidae 6.3% and Boidae 0.9%). The most abundant were: Liophis miliaris (n = 33), Micrurus corallinus and Chironius fuscus (both with n = 26); the least abundant: Elapomorphus quinquelineatus, Siphlophis compressus and Tropidodryas serra (all with n = 1). The species that contributed the greatest biomass were Spilotes pullatus (7,925 g), Chironius laevicollis (4,694 g), Liophis miliaris (3,675 g) and Pseustes sulphureus (3,050 g); those that contributed the lowest biomass were: Siphlophis compressus, Tropidodryas serra (both with 4 g) and Elapomorphus quinquelineatus (3 g). We found significant differences between the sampled habitats at the Serra do Mendanha (undisturbed forest, secondary forest and banana plantations). The results showed that a great reduction in the abundance, richness, diversity and biomass of the snakes occurs when the native forest is replaced by banana plantations.

  10. Mosquito (Diptera: Culicidae) assemblages associated with Nidularium and Vriesea bromeliads in Serra do Mar, Atlantic Forest, Brazil

    PubMed Central

    2012-01-01

    Background The most substantial and best preserved area of Atlantic Forest is within the biogeographical sub-region of Serra do Mar. The topographic complexity of the region creates a diverse array of microclimates, which can affect species distribution and diversity inside the forest. Given that Atlantic Forest includes highly heterogeneous environments, a diverse and medically important Culicidae assemblage, and possible species co-occurrence, we evaluated mosquito assemblages from bromeliad phytotelmata in Serra do Mar (southeastern Brazil). Methods Larvae and pupae were collected monthly from Nidularium and Vriesea bromeliads between July 2008 and June 2009. Collection sites were divided into landscape categories (lowland, hillslope and hilltop) based on elevation and slope. Correlations between bromeliad mosquito assemblage and environmental variables were assessed using multivariate redundancy analysis. Differences in species diversity between bromeliads within each category of elevation were explored using the Renyi diversity index. Univariate binary logistic regression analyses were used to assess species co-occurrence. Results A total of 2,024 mosquitoes belonging to 22 species were collected. Landscape categories (pseudo-F value = 1.89, p = 0.04), bromeliad water volume (pseudo-F = 2.99, p = 0.03) and bromeliad fullness (Pseudo-F = 4.47, p < 0.01) influenced mosquito assemblage structure. Renyi diversity index show that lowland possesses the highest diversity indices. The presence of An. homunculus was associated with Cx. ocellatus and the presence of An. cruzii was associated with Cx. neglectus, Cx. inimitabilis fuscatus and Cx. worontzowi. Anopheles cruzii and An. homunculus were taken from the same bromeliad, however, the co-occurrence between those two species was not statistically significant. Conclusions One of the main findings of our study was that differences in species among mosquito assemblages were influenced by landscape characteristics. The

  11. Mosquito (Diptera: Culicidae) assemblages associated with Nidularium and Vriesea bromeliads in Serra do Mar, Atlantic Forest, Brazil.

    PubMed

    Marques, Tatiani C; Bourke, Brian P; Laporta, Gabriel Z; Sallum, Maria Anice Mureb

    2012-02-16

    The most substantial and best preserved area of Atlantic Forest is within the biogeographical sub-region of Serra do Mar. The topographic complexity of the region creates a diverse array of microclimates, which can affect species distribution and diversity inside the forest. Given that Atlantic Forest includes highly heterogeneous environments, a diverse and medically important Culicidae assemblage, and possible species co-occurrence, we evaluated mosquito assemblages from bromeliad phytotelmata in Serra do Mar (southeastern Brazil). Larvae and pupae were collected monthly from Nidularium and Vriesea bromeliads between July 2008 and June 2009. Collection sites were divided into landscape categories (lowland, hillslope and hilltop) based on elevation and slope. Correlations between bromeliad mosquito assemblage and environmental variables were assessed using multivariate redundancy analysis. Differences in species diversity between bromeliads within each category of elevation were explored using the Renyi diversity index. Univariate binary logistic regression analyses were used to assess species co-occurrence. A total of 2,024 mosquitoes belonging to 22 species were collected. Landscape categories (pseudo-F value = 1.89, p = 0.04), bromeliad water volume (pseudo-F = 2.99, p = 0.03) and bromeliad fullness (Pseudo-F = 4.47, p < 0.01) influenced mosquito assemblage structure. Renyi diversity index show that lowland possesses the highest diversity indices. The presence of An. homunculus was associated with Cx. ocellatus and the presence of An. cruzii was associated with Cx. neglectus, Cx. inimitabilis fuscatus and Cx. worontzowi. Anopheles cruzii and An. homunculus were taken from the same bromeliad, however, the co-occurrence between those two species was not statistically significant. One of the main findings of our study was that differences in species among mosquito assemblages were influenced by landscape characteristics. The bromeliad factor that influenced

  12. Antibacterial activity-guided purification and identification of a novel C-20 oxygenated ent-kaurane from Rabdosia serra (MAXIM.) HARA.

    PubMed

    Lin, Lianzhu; Zhu, Dashuai; Zou, Linwu; Yang, Bao; Zhao, Mouming

    2013-08-15

    The objective of this work was to conduct an activity-guided isolation of antibacterial compounds from Rabdosia serra. The ethanol extracts of R. serra leaf and stem were partitioned sequentially into petroleum ether, ethyl acetate, butanol and water fractions, respectively. The ethanol extract of leaf evidenced broad-spectrum antibacterial activity against gram-positive bacterial, including Bacillus subtilis, Bacillus cereus, Staphylococcus aureus, and Listeria monocytogenes. The ethyl acetate fractions of leaf and stem exhibited strong inhibition against gram-positive bacteria, and were then purified further. On the basis of antibacterial assay-guided purification, three phenolic compounds (rosmarinic acid, methyl rosmarinate and pedalitin) and four C-20 oxygenated ent-kauranes (effusanin E, lasiodin, rabdosichuanin D and a new compound namely effusanin F) were obtained, whose contents were determined by HPLC analysis. The broth microdilution method confirmed the important inhibition potential of C-20 oxygenated ent-kauranes with low minimum inhibitory concentration (MIC) values. Effusanin E, lasiodin and effusanin F could be useful for the development of new antibacterial agents. Copyright © 2013 Elsevier Ltd. All rights reserved.

  13. Parasites of domestic and wild canids in the region of Serra do Cipó National Park, Brazil.

    PubMed

    Santos, Juliana Lúcia Costa; Magalhães, Noele Borges; Dos Santos, Hudson Andrade; Ribeiro, Raul Rio; Guimarães, Marcos Pezzi

    2012-01-01

    Over recent decades, diseases have been shown to be important causes of extinctions among wild species. Greater emphasis has been given to diseases transmitted by domestic animals, which have been increasing in numbers in natural areas, along with human populations. This study had the aim of investigating the presence of intestinal helminths in wild canids (maned wolf, Chrysocyon brachyurus, and crab-eating fox, Cerdocyon thous) in the Serra do Cipó National Park (43-44º W and 19-20º S) and endo and ectoparasites of domestic dogs in the Morro da Pedreira Environmental Protection Area (an area surrounding the National Park). The Serra do Cipó is located in the state of Minas Gerais, Brazil. Among the enteroparasites found in domestic and wild canids, the following taxons were identified: Ancylostomidae, Trichuridae, Toxocara sp., Spirocerca sp., Physaloptera sp., Strongyloides sp., Cestoda, Dipylidium caninum, Diphyllobothriidae, Hymenolepidae, Anoplocephalidae, Trematoda, Acanthocephala and Isospora sp. Domestic dogs were positive for leishmaniasis and Babesia canis in serological tests. Among the ectoparasites, Rhipicephalus sanguineus, Amblyomma cajennense and Ctenocephalides felis felis were observed in domestic dogs. Variations in the chaetotaxy of the meta-episternum and posterior tibia were observed in some specimens of C. felis felis.

  14. Characterizing the Siple Coast Ice Stream System using Satellite Images, Improved Topography, and Integrated Aerogeophysical Measurements

    NASA Technical Reports Server (NTRS)

    Scambos, Ted

    2003-01-01

    A technique for improving elevation maps of the polar ice sheets has been developed using AVHRR images. The technique is based on 'photoclinometry' or 'shape from shading', a technique used in the past for mapping planetary surfaces where little elevation information was available. The fundamental idea behind photoclinometry is using the brightness of imaged areas to infer their surface slope in the sun-illuminated direction. Our version of the method relies on a calibration of the images based on an existing lower-resolution digital elevation model (DEM), and then using the images to improve the input DEM resolution to the scale of the image data. Most current DEMs covering the ice sheets are based on Radar altimetry data, and have an inherent resolution of 10 to 25 km at best - although the grid scale of the DEM is often finer. These DEMs are highly accurate (to less than 1 meter); but they report the mean elevation of a broad area, thus erasing smaller features of glaciological interest. AVHRR image data, when accurately geolocated and calibrated, provides surface slope measurements (based on the pixel brightness under known lighting conditions) every approximately 1.1 km. The limitations of the technique are noisiness in the image data, small variations in the albedo of the snow surface, and the integration technique used to create an elevation field from the image-derived slopes. Our study applied the technique to several ice sheet areas having some elevation data; Greenland, the Amery Ice Shelf, the Institute Ice Stream, and the Siple Coast. For the latter, the input data set was laser-altimetry data collected under NSF's SOAR Facility (Support Office for Aerogeophysical Research) over the onset area of the Siple Coast. Over the course of the grant, the technique was greatly improved and modified, significantly improving accuracy and reducing noise from the images. Several publications resulted from the work, and a follow-on proposal to NASA has been

  15. Elements concentration analysis in groundwater from the North Serra Geral aquifer in Santa Helena-Brazil using SR-TXRF spectrometer.

    PubMed

    Justen, Gisele C; Espinoza-Quiñones, Fernando R; Módenes, Aparecido Nivaldo; Bergamasco, Rosangela

    2012-01-01

    In this work the analysis of elements concentration in groundwater was performed using the synchrotron radiation total-reflection X-ray fluorescence (SR-TXRF) technique. A set of nine tube-wells with serious risk of contamination was chosen to monitor the mean concentration of elements in groundwater from the North Serra Geral aquifer in Santa Helena, Brazil, during 1 year. Element concentrations were determined applying a SR-TXRF methodology. The accuracy of SR-TXRF technique was validated by analysis of a certified reference material. As the groundwater composition in the North Serra Geral aquifer showed heterogeneity in the spatial distribution of eight major elements, a hierarchical clustering to the data was performed. By a similarity in their compositions, two of the nine wells were grouped in a first cluster, while the other seven were grouped in a second cluster. Calcium was the major element in all wells, with higher Ca concentration in the second cluster than in the first cluster. However, concentrations of Ti, V, Cr in the first cluster are slightly higher than those in the second cluster. The findings of this study within a monitoring program of tube-wells could provide a useful assessment of controls over groundwater composition and support management at regional level.

  16. Microbiological characterization of Serra da Estrela cheese throughout its Appellation d'Origine Protégée region.

    PubMed

    Tavaria, F K; Malcata, F X

    1998-05-01

    The purpose of this study was to assess the typical microbiological quality of the most famous Portuguese traditional cheese, Serra da Estrela, and to assess its ripening time and geographical dependence. Ninety-six experimental cheeses manufactured from sixteen batches of milk on eight dairy farms scattered over the Appellation d' Origine Protégée (AOP) region were qualitatively and quantitatively evaluated microbiologically at various ripening times. Viable counts were performed after inoculation on appropriate selective media for aerobic mesophiles and proteolytic and lipolytic microflora, as well as lactococci, lactobacilli, species of Enterobacteriaceae, lactic streptococci, staphylococci, and yeasts. Members of the Enterobacteriaceae and lactic acid bacteria were the predominant microbial groups on all dairy farms throughout maturation; the latter are probably the microbial group responsible for most proteolytic and lipolytic breakdown in Serra da Estrela cheese. The microbial groups whose numbers were most affected by dairy-to-dairy variation were species of Enterobacteriaceae staphylococci, and enterococci, which are the most critical groups in terms of health hazards. It is therefore suggested that tighter control should be implemented at the level of choice of raw materials, in milk-handling practices, and in general throughout the manufacturing process in attempts to standardize production and consistently reduce microbiological risks (even though the distinctiveness of a few final organoleptic characteristics may somehow be reduced.

  17. RAPD and SCAR markers as potential tools for detection of milk origin in dairy products: Adulterant sheep breeds in Serra da Estrela cheese production.

    PubMed

    Cunha, Joana T; Ribeiro, Tânia I B; Rocha, João B; Nunes, João; Teixeira, José A; Domingues, Lucília

    2016-11-15

    Serra da Estrela Protected Designation of Origin (PDO) cheese is the most famous Portuguese cheese and has a high commercial value. However, the adulteration of production with cheaper/lower-quality milks from non-autochthones ovine breeds compromises the quality of the final product and undervalues the original PDO cheese. A Randomly Amplified Polymorphic DNA (RAPD) method was developed for efficient detection of adulterant breeds in milk mixtures used for fraudulent production of this cheese. Furthermore, Sequence Characterized Amplified Region (SCAR) markers were designed envisioning the detection of milk adulteration in processed dairy foods. The RAPD-SCAR technique is here described, for the first time, to be potentially useful for detection of milk origin in dairy products. In this sense, our findings will play an important role on the valorization of Serra da Estrela cheese, as well as on other high-quality dairy products prone to adulteration, contributing to the further development of the dairy industry. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Seasonally warmer and humid climates in a lower paleolatitude position of southern Brazil (Paraná Basin): new findings of the Lueckisporites virkkiae zone (late Cisuralian-Guadalupian) in the Serra do Rio do Rastro and neighboring localities

    NASA Astrophysics Data System (ADS)

    di Pasquo, Mercedes; Souza, Paulo A.; Kavali, Pauline Sabina; Felix, Cristina

    2018-03-01

    First palynological information from surface samples of the Serra Alta and Rio do Rasto formations (Passa Dois Group, Paraná Basin), exposed in the Serra do Rio do Rastro (White's Column) and Urubici regions in Santa Catarina State (Brazil) is presented. The Serra Alta Formation is transitionally deposited over the Irati Formation, which is constrained to the late Artinskian/Kungurian by different paleontological and radiometric data. Twelve productive samples (of forty) yielded fairly well preserved palynomorphs, dominated by striate and non striate bisaccate and asaccate pollen grains and subordinated trilete and monolete spores, monosaccate pollen grains and Botryococcus. Diagnostic species of the Lueckisporites virkkiae Zone (Artinskian-Guadalupian) in the Paraná Basin are recorded along with few species of Guadalupian-Lopingian age (e.g. Cladaitina veteadensis, Guttulapollenites hannonicus, Lophotriletes parryensis, Protohaploxypinus microcorpus, Staurosaccites quadrifidus, Weylandites cincinnatus). They support a Kungurian-?Roadian age for the Serra Alta, and a Capitanian (?Lopingian) age for the Rio do Rasto formations. Four samples from the Sete Quedas outcrop yielded scarce and poorly preserved specimens of Lueckisporites likely due to weathering. A statistic comparison among our assemblages and selected Permian palynozones and palynofloras from South America supports a closer correlation with the La Veteada Formation (Guadalupian-Lopingian) from western Argentina due to common occurrence of all the species, and with the Striatites Zone (late Artinskian-Kungurian) of the Chacoparaná Basin, and the I-S Zone Melo Formation in Uruguay. The botanical affinities of the palynomorphs from both assemblages indicate the presence of spores of hygro-mesophytic affinities along with meso-xerophyle pollen grains, which is in agreement with seasonally warmer and humid climates favored by a lower paleolatitude position. The presence of pyrite in some of the miospore

  19. Phlebotomine Sand Fly Fauna and Leishmania Infection in the Vicinity of the Serra do Cipó National Park, a Natural Brazilian Heritage Site

    PubMed Central

    Lana, Rosana Silva; Michalsky, Érika Monteiro; Fortes-Dias, Consuelo Latorre; França-Silva, João Carlos; Lara-Silva, Fabiana de Oliveira; Lima, Ana Cristina Vianna Mariano da Rocha; Moreira de Avelar, Daniel; Martins, Juliana Cristina Dias; Dias, Edelberto Santos

    2015-01-01

    In the New World, the leishmaniases are primarily transmitted to humans through the bites of Leishmania-infected Lutzomyia (Diptera: Psychodidae) phlebotomine sand flies. Any or both of two basic clinical forms of these diseases are endemic to several cities in Brazil—the American cutaneous leishmaniasis (ACL) and the American visceral leishmaniasis (AVL). The present study was conducted in the urban area of a small-sized Brazilian municipality (Jaboticatubas), in which three cases of AVL and nine of ACL have been reported in the last five years. Jaboticatubas is an important tourism hub, as it includes a major part of the Serra do Cipó National Park. Currently, no local data is available on the entomological fauna or circulating Leishmania. During the one-year period of this study, we captured 3,104 phlebotomine sand flies belonging to sixteen Lutzomyia species. In addition to identifying incriminated or suspected vectors of ACL with DNA of the etiological agent of AVL and vice versa, we also detected Leishmania DNA in unexpected Lutzomyia species. The expressive presence of vectors and natural Leishmania infection indicates favorable conditions for the spreading of leishmaniases in the vicinity of the Serra do Cipó National Park. PMID:25793193

  20. Phlebotomine sand fly fauna and leishmania infection in the vicinity of the Serra do Cipó National Park, a natural Brazilian heritage site.

    PubMed

    Lana, Rosana Silva; Michalsky, Érika Monteiro; Fortes-Dias, Consuelo Latorre; França-Silva, João Carlos; Lara-Silva, Fabiana de Oliveira; Lima, Ana Cristina Vianna Mariano da Rocha; Moreira de Avelar, Daniel; Martins, Juliana Cristina Dias; Dias, Edelberto Santos

    2015-01-01

    In the New World, the leishmaniases are primarily transmitted to humans through the bites of Leishmania-infected Lutzomyia (Diptera: Psychodidae) phlebotomine sand flies. Any or both of two basic clinical forms of these diseases are endemic to several cities in Brazil--the American cutaneous leishmaniasis (ACL) and the American visceral leishmaniasis (AVL). The present study was conducted in the urban area of a small-sized Brazilian municipality (Jaboticatubas), in which three cases of AVL and nine of ACL have been reported in the last five years. Jaboticatubas is an important tourism hub, as it includes a major part of the Serra do Cipó National Park. Currently, no local data is available on the entomological fauna or circulating Leishmania. During the one-year period of this study, we captured 3,104 phlebotomine sand flies belonging to sixteen Lutzomyia species. In addition to identifying incriminated or suspected vectors of ACL with DNA of the etiological agent of AVL and vice versa, we also detected Leishmania DNA in unexpected Lutzomyia species. The expressive presence of vectors and natural Leishmania infection indicates favorable conditions for the spreading of leishmaniases in the vicinity of the Serra do Cipó National Park.

  1. Basaltic ring structures of the Serra Geral Formation at the southern Triângulo Mineiro, Água Vermelha region, Brazil

    NASA Astrophysics Data System (ADS)

    Pacheco, Fernando Estevão Rodrigues Crincoli; Caxito, Fabricio de Andrade; Moraes, Lucia Castanheira de; Marangoni, Yara Regina; Santos, Roberto Paulo Zanon dos; Pedrosa-Soares, Antonio Carlos

    2018-04-01

    The Serra Geral Formation constitutes a continental magmatic province on the southern part of South America within the Paraná basin. Basaltic magmatism of the Serra Geral Formation occurred as extrusions at around 134.5 to 131.5 My ago. The formation is part of the Paraná-Etendeka large igneous province, spanning South America and southwestern Africa. The main extrusion mechanism was probably through fissures related to extensional regime during the breakup of Gondwana in the Cretaceous. Basaltic ring structures (BRS) with tens of meters of diameter, cropping out downstream of Grande river at Água Vermelha hydroelectric dam in southern Triângulo Mineiro region, enable the study of the mechanism of extrusion. The origin of the BRS has been subject to differing interpretations in the past, either collapsed lava flows or central conduits. Detailed geological mapping at 1:1000 scale, stratigraphic, petrographic and gravimetric analysis of the most well preserved of the BRS, with a 200 m diameter, has enabled the description of thirteen different basalt lava flows, along with single a central lava lake and a ring dyke structure. The central flow, interpreted as a preserved lava lake, comprises vesicle- and amygdale-rich basalt, spatter, ropy and degassing structures. The most basal of the thirteen lava flows has massive basalt containing geodes filled with quartz. Above, the lava flows show massive basalt with vertical columnar jointing where is possible to identify the top and bottom of each individual flow, with gentle dips towards the perimeter of the structure. A prominent ring dyke dipping towards the lava lake presents horizontal columnar jointing and cuts the basal and central flows. The gravimetric analysis shows a weak negative Bouguer anomaly on the center of the BRS. The proposed model describes the volcanism of the region in three main steps: (1) fissure flow occurs with lava input; (2) this lava cools and crystallizes cementing most of the fissures

  2. Short-range ensemble predictions based on convection perturbations in the Eta Model for the Serra do Mar region in Brazil

    NASA Astrophysics Data System (ADS)

    Bustamante, J. F. F.; Chou, S. C.; Gomes, J. L.

    2009-04-01

    The Southeast Brazil, in the coastal and mountain region called Serra do Mar, between Sao Paulo and Rio de Janeiro, is subject to frequent events of landslides and floods. The Eta Model has been producing good quality forecasts over South America at about 40-km horizontal resolution. For that type of hazards, however, more detailed and probabilistic information on the risks should be provided with the forecasts. Thus, a short-range ensemble prediction system (SREPS) based on the Eta Model is being constructed. Ensemble members derived from perturbed initial and lateral boundary conditions did not provide enough spread for the forecasts. Members with model physics perturbation are being included and tested. The objective of this work is to construct more members for the Eta SREPS by adding physics perturbed members. The Eta Model is configured at 10-km resolution and 38 layers in the vertical. The domain covered is most of Southeast Brazil, centered over the Serra do Mar region. The constructed members comprise variations of the cumulus parameterization Betts-Miller-Janjic (BMJ) and Kain-Fritsch (KF) schemes. Three members were constructed from the BMJ scheme by varying the deficit of saturation pressure profile over land and sea, and 2 members of the KF scheme were included using the standard KF and a momentum flux added to KF scheme version. One of the runs with BMJ scheme is the control run as it was used for the initial condition perturbation SREPS. The forecasts were tested for 6 cases of South America Convergence Zone (SACZ) events. The SACZ is a common summer season feature of Southern Hemisphere that causes persistent rain for a few days over the Southeast Brazil and it frequently organizes over Serra do Mar region. These events are particularly interesting because of the persistent rains that can accumulate large amounts and cause generalized landslides and death. With respect to precipitation, the KF scheme versions have shown to be able to reach the

  3. On Ensino de Astronomia nas Cidades de Ribeirão Pires e Rio Grande da Serra

    NASA Astrophysics Data System (ADS)

    Faria, R. Z.; Voelzke, M. R.

    2007-08-01

    Apesar da astronomia ser um dos temas indicados pelos Parâmetros Curriculares Nacionais, observa-se que poucas mudanças ocorreram desde a implementação do mesmo em sala de aula. A presente pesquisa diz respeito sobre como os tópicos de astronomia estão sendo abordados pelos professores no ensino médio. Optou-se por aplicar um questionário com os professores que ministram a disciplina de física. Os mesmos trabalham em escolas estaduais situadas nas cidades de Ribeirão Pires e Rio Grande da Serra, ambas subordinadas a Diretoria de Ensino de Mauá, no Estado de São Paulo. O questionário foi aplicado durante o 2° semestre de 2006. Até o momento os resultados são preliminares. Dos 82,0% dos professores que responderam ao questionário no município de Rio Grande da Serra, 66,7% não aplicaram nenhum tópico de astronomia, 77,8% não utilizaram qualquer tipo de programa computacional, 66,7% não utilizaram laboratório, que 77,8% nunca levaram os alunos a museus e ou planetários e que 66,7% não indicaram qualquer tipo de revista ou livro sobre astronomia aos seus alunos. No município de Ribeirão Pires, 53,3% dos professores responderam ao questionário, destes 75,0% não aplicaram nenhum tópico de astronomia, 93,8% não utilizaram qualquer tipo de programa computacional, 75,0% não utilizaram laboratório, 81,3% nunca levaram os alunos a museus e ou planetário e 56,3% não indicaram qualquer tipo de revista ou livro sobre astronomia ao seus alunos. Apesar da maioria dos professores reconhecerem que o conteúdo de astronomia influi na formação do jovem, os mesmos não incluem o tema em seus planejamentos escolares.

  4. Background Noise of the Aldeia da Serra Region (Portugal) from a temporary broad band network

    NASA Astrophysics Data System (ADS)

    Wachilala, Piedade; Borges, José; Caldeira, Bento; Bezzeghoud, Mourad

    2017-04-01

    In this study, we analyse seismic background noise to assess the effect of noise based on the detectability of a temporary network constituted by DOCTAR (Deep Ocean Test Array), who have been deployed in a period between 2011 and 2012 in Portugal mainland, and the Évora permanent seismic station. This network is constituted by 14 digital broadband stations (14 CMG-3ESP and one STS2 sensors) with a flat response between the 60 sec to 50 Hz, 24-bit and 120s to 60Hz respectively. The temporary network was operated in continuous recording mode (three-components) in a region located in the north of the region of Évora, within a radius of about 30 km around the village of Aldeia da Serra, region in which there is an important seismic activity in the context of Portugal mainland. We calculated power spectral densities of background noise for each station/component and compare them with high-noise model and low-noise model of Peterson (1993). We consider different for day and night local and for different periods of the year. Power spectral density estimates show moderate noise levels with all stations falling within the high and low bounds of Peterson (1993). Considering the results of the noise, we estimate the detection limit of each station and consequently the detectability of the network. From this information and taking in attention the events recorded during the period of DOCTAR operation we analyse the improvement promoted by this temporary network regarding the existent seismic networks to the local seismicity study. This work was partially supported by COMPETE 2020 program (POCI-01-0145-FEDER-007690 project). We acknowledge GFZ Potsdam for providing part of the data used in this study.

  5. Air and shipborne magnetic surveys of the Antarctic into the 21st century

    NASA Astrophysics Data System (ADS)

    Golynsky, A.; Bell, R.; Blankenship, D.; Damaske, D.; Ferraccioli, F.; Finn, C.; Golynsky, D.; Ivanov, S.; Jokat, W.; Masolov, V.; Riedel, S.; von Frese, R.; Young, D.

    2013-02-01

    The Antarctic geomagnetics' community remains very active in crustal anomaly mapping. More than 1.5 million line-km of new air- and shipborne data have been acquired over the past decade by the international community in Antarctica. These new data together with surveys that previously were not in the public domain significantly upgrade the ADMAP compilation. Aeromagnetic flights over East Antarctica have been concentrated in the Transantarctic Mountains, the Prince Charles Mountains - Lambert Glacier area, and western Dronning Maud Land (DML) — Coats Land. Additionally, surveys were conducted over Lake Vostok and the western part of Marie Byrd Land by the US Support Office for Aerogeophysical Research projects and over the Amundsen Sea Embayment during the austral summer of 2004/2005 by a collaborative US/UK aerogeophysical campaign. New aeromagnetic data over the Gamburtsev Subglacial Mountains (120,000 line-km), acquired within the IPY Antarctica's Gamburtsev Province project reveal fundamental geologic features beneath the East Antarctic Ice sheet critical to understanding Precambrian continental growth processes. Roughly 100,000 line-km of magnetic data obtained within the International Collaboration for Exploration of the Cryosphere through Aerogeophysical Profiling promises to shed light on subglacial lithology and identify crustal boundaries for the central Antarctic Plate. Since the 1996/97 season, the Alfred Wegener Institute has collected 90,000 km of aeromagnetic data along a 1200 km long segment of the East Antarctic coast over western DML. Recent cruises by Australian, German, Japanese, Russian, British, and American researchers have contributed to long-standing studies of the Antarctic continental margin. Along the continental margin of East Antarctica west of Maud Rise to the George V Coast of Victoria Land, the Russian Polar Marine Geological Research Expedition and Geoscience Australia obtained 80,000 and 20,000 line-km, respectively, of

  6. Thematic mapping of likely target areas for the occurence of cassiterite in the Serra do Mocambo (GO) granitic massifs using LANDSAT 2 digital imaging

    NASA Technical Reports Server (NTRS)

    Almeidofilho, R. (Principal Investigator)

    1984-01-01

    The applicability of LANDSAT/MSS images, enhanced by computer derived techniques, as essential tools in mineral research was investigated and the Serra do Mocambo granitic massif was used as illustration. Given the peculiar factors founded in this area, orbital imagery permitted the delineation of potential target areas of mineralization occurrences, associated to albitized/greisenized types. Follow up prospection for primary tin deposits in this granitic massif should be restricted to the delineated areas which are less than 5% of the total superficial area of the massif.

  7. Feeding ecology of the lizard Tropidurus oreadicus Rodrigues 1987 (Tropiduridae) at Serra dos Carajás, Pará state, northern Brazil.

    PubMed

    Rocha, C F D; Siqueira, C C

    2008-02-01

    Tropidurus species commonly prey on arthropods, but they may also feed on vertebrates and plant material. The lizard Tropidurus oreadicus (Tropiduridae) is common in open vegetation habitats and generally has sexual dimorphism. In this study we analyzed the diet of T. oreadicus at Serra dos Carajás, Pará, in the north of Brazil. Snout-vent length (SVL) and jaw width (JW) were taken for 34 lizards. There was a significant difference in SVL and in JW, with males being larger than females. All lizards analyzed contained food in their stomachs. The diet of T. oreadicus at Serra dos Carajás was characterized by the consumption of a relative wide spectrum of food item categories (21 types of items), consisting of arthropods, part of one vertebrate and plant material, which characterizes the diet of a generalist predator. Volumetrically, the most important items in the diet of both sexes of T. oreadicus were flowers (M = 61.7%; F = 33%) and orthopterans (M = 1.7%; F = 3.5%). Ants were the most frequently consumed (100% for both sexes) and the most numerous (M = 94.5%; F = 89.4%) food item. Flowers also were frequently consumed (M = 91.7%; F = 54.5%), with their relative consumption differing significantly between sexes. There was not a significant sexual difference in prey volume, neither in number of preys per stomach, nor in type of prey ingested. There was no relationship between lizard jaw width and the mean volume of prey. The data showed that T. oreadicus is a relatively generalist lizard in terms of diet and that consumes large volumes of plant material, especially flowers of one species of genus Cassia.

  8. Assessment of risk to human health from simultaneous exposure to multiple contaminants in an artisanal gold mine in Serra Pelada, Pará, Brazil.

    PubMed

    de Souza, Edna Santos; Texeira, Renato Alves; da Costa, Hercília Samara Cardoso; Oliveira, Fábio Júnior; Melo, Leônidas Carrijo Azevedo; do Carmo Freitas Faial, Kelson; Fernandes, Antonio Rodrigues

    2017-01-15

    Contamination of soil, water and plants caused by gold mining is of great societal concern because of the risk of environmental pollution and risk to human health. The aim of the present study was to evaluate the risk to human health from ingestion of As, Ba, Co, Cu, Cd, Cr, Ni, Pb, Se and Ni present in soil, sterile and mineralized waste, and water and plants at a gold mine in Serra Pelada, Pará, Brazil. Samples of soil, sterile and mineralized waste, water and plants were collected around an artisanal gold mine located in Serra Pelada. The mean concentrations of potentially toxic elements in the soil were higher than the soil quality reference values as defined in the legislation, which may be attributeable to past mining activities. Water from the area close to the mine exhibited As, Ba and Pb concentrations exceeding the reference values established by the World Health Organization, deemed unfit for human consumption. Plants exhibited high Pb concentrations, representing a food safety risk to the population. The mean hazard index (HI) values were below the acceptable limit (1.0) established by the United States Environmental Protection Agency, although the highest HI values observed for adults and children were higher than the respective acceptable limits. Environmental contamination and risk to human health were heterogeneous in the surroundings of the mine. Mitigation strategies need to be adopted to decrease the risks of contamination to the environment and to the local population. Copyright © 2016 Elsevier B.V. All rights reserved.

  9. Mapping soil erosion risk in Serra de Grândola (Portugal)

    NASA Astrophysics Data System (ADS)

    Neto Paixão, H. M.; Granja Martins, F. M.; Zavala, L. M.; Jordán, A.; Bellinfante, N.

    2012-04-01

    Geomorphological processes can pose environmental risks to people and economical activities. Information and a better knowledge of the genesis of these processes is important for environmental planning, since it allows to model, quantify and classify risks, what can mitigate the threats. The objective of this research is to assess the soil erosion risk in Serra de Grândola, which is a north-south oriented mountain ridge with an altitude of 383 m, located in southwest of Alentejo (southern Portugal). The study area is 675 km2, including the councils of Grândola, Santiago do Cacém and Sines. The process for mapping of erosive status was based on the guidelines for measuring and mapping the processes of erosion of coastal areas of the Mediterranean proposed by PAP/RAC (1997), developed and later modified by other authors in different areas. This method is based on the application of a geographic information system that integrates different types of spatial information inserted into a digital terrain model and in their derivative models. Erosive status are classified using information from soil erodibility, slope, land use and vegetation cover. The rainfall erosivity map was obtained using the modified Fournier index, calculated from the mean monthly rainfall, as recorded in 30 meteorological stations with influence in the study area. Finally, the soil erosion risk map was designed by ovelaying the erosive status map and the rainfall erosivity map.

  10. Weathering phases recorded by gnammas developed since last glaciation at Serra da Estrela, Portugal

    NASA Astrophysics Data System (ADS)

    Domínguez-Villar, David; Razola, Laura; Carrasco, Rosa M.; Jennings, Carrie E.; Pedraza, Javier

    2009-09-01

    The morphometrical analysis of gnammas (weathering pits) in granite landscapes has been used to establish the relative chronology of recent erosive surfaces and to provide the weathering history in a region. To test the validity of gnammas as relative chronometer indicators, and the reliability of the obtained weathering record, two sites have been studied in Serra da Estrela, Portugal. The first site is within the limits of the glacier that existed in these mountains during the last glaciation, whereas the second site is located in an unglaciated sector of the mountains, which preserves a longer record of weathering in the bedrock surface. The number of gnamma weathering phases recorded in the latter site (8) is larger than those from the former (6). Correlation between both measurement stations based on morphometrical criteria is excellent for the younger six weathering phases (1 to 6). Consequently, the parameter used for relative chronology ( δ-value) has been verified to be age dependent, although absolute values are modulated by microclimate due to altitude variations. The weathering record was essentially duplicated once the surfaces at both sites were exposed, demonstrating the reliability of gnamma evolution as a post-glacial environmental indicator for the region.

  11. Assessment of computer techniques for processing digital LANDSAT MSS data for lithological discrimination of Serra do Ramalho, State of Bahia

    NASA Technical Reports Server (NTRS)

    Paradella, W. R. (Principal Investigator); Vitorello, I.; Monteiro, M. D.

    1984-01-01

    Enhancement techniques and thematic classifications were applied to the metasediments of Bambui Super Group (Upper Proterozoic) in the Region of Serra do Ramalho, SW of the state of Bahia. Linear contrast stretch, band-ratios with contrast stretch, and color-composites allow lithological discriminations. The effects of human activities and of vegetation cover mask and limit, in several ways, the lithological discrimination with digital MSS data. Principal component images and color composite of linear contrast stretch of these products, show lithological discrimination through tonal gradations. This set of products allows the delineations of several metasedimentary sequences to a level superior to reconnaissance mapping. Supervised (maximum likelihood classifier) and nonsupervised (K-Means classifier) classification of the limestone sequence, host to fluorite mineralization show satisfactory results.

  12. The (serra da) Estrela Aspiring Geopark (Portugal): preserving geoheritage, while promoting science and its links to local communities

    NASA Astrophysics Data System (ADS)

    Gomes, Hugo; Fernandes, Magda; Castro, Emanuel; Vieira, Gonçalo

    2017-04-01

    The serra da Estrela (1,993 m asl) is the highest mountain range in mainland Portugal. Bounded by two main fault scarps, a granite massif occupies the central area forming a summit plateau between ci. 1,500 and 2,000 m. To the north and south, schists and greywackes dominate the landscape, also with granite presence. During the Last Glacial a plateau ice-field and five radiating valley glaciers occupied the highest parts of the mountain with an estimated equilibrium line altitude at 1,650 m asl. The plateau style of the glaciation and the Equilibrium Line Altitude just below the plateau edge made the Estrela very sensitive to climate fluctuations, having resulted in several terminal moraine complexes that reveal several glacial stages. The central plateau area shows widespread glacial erosion features and an almost complete stripping of the Cenozoic weathering mantle. The non-glaciated plateaus show a rich landscape dominated by granite weathering landforms. The remarkable glacial landscape of the serra da Estrela when considering its setting in SW Europe, together with other significant geoheritage such as periglacial, weathering and mass wasting phenomena, tectonic, petrological and hydrogeological features, are at the core of Estrela's application to become a UNESCO Global Geopark. But the framework of the application encompasses both the natural and the human landscape, involving nine municipalities in the wider Estrela range, whose population bears an Estrelean signature in its roots, traditions, culture and economy. The Estrela Aspiring Geopark builds on a high value geoheritage closely bonded with biodiversity and the local communities, and its strategy aims at conservation and promoting regional development in an interdisciplinary approach committed UNESCO's principles. This presentation is a brief overview of the Estrela geoheritage, with a focus on the strategy for the implementation and management of the Geopark, emphasising on the science-support plan

  13. Geochemical and isotopic constraints on the tectonic setting of Serra dos Carajas belt, eastern Para, Brazil

    NASA Technical Reports Server (NTRS)

    Olszewski, W. J., Jr.; Gibbs, A. K.; Wirth, K. R.

    1986-01-01

    The lower part of the Serra dos Carajas belt is the metavolcanic and metasedimentary Grao para Group (GPG). The GPG is thought to unconformably overlie the older (but undated) Xingu Complex, composed of medium and high-grade gneisses and amphibolite and greenstone belts. The geochemical data indicate that the GPG has many features in common with ancient and modern volcanic suites erupted through continental crust. The mafic rocks clearly differ from those of most Archean greenstone belts, and modern MORB, IAB, and hot-spot basalts. The geological, geochemical, and isotopic data are all consistent with deposition on continental crust, presumably in a marine basin formed by crustal extension. The isotopic data also suggest the existence of depleted mantle as a source for the parent magmas of the GPG. The overall results suggest a tectonic environment, igneous sources, and petrogenesis similar to many modern continental extensional basins, in contrast to most Archean greenstone belts. The Hammersley basin in Australia and the circum-Superior belts in Canada may be suitable Archean and Proterozoic analogues, respectively.

  14. La Serra d'Almos (Tarragona): an example of phenological data rescue and preservation in Catalonia

    NASA Astrophysics Data System (ADS)

    Busto, Montserrat; Cunillera, Jordi; de Yzaguirre, Xavi; Borrell, Josep

    2016-04-01

    The interruption of important phenological series and the progressive disappearance of phenological observations in Catalonia led the Meteorological Service of Catalonia (SMC) to design and impulse a new phenological network promoted by the Climate Change Unit of this Met Service. The "Fenocat" network was born in March 2013, and currently has around fifty observers distributed throughout Catalonia that observe plants, birds and butterflies. We are providing data from different plant phenophases to PEP725 database. Besides this new phenological network (Fenocat), one of the aims of SMC is to rescue and preserve historical data from different observation points in Catalonia. We show in this poster the example of rescue and preservation of phenological data from la Serra d'Almos (in Tivissa, near Tarragona, Catalonia, NE Iberian Peninsula), an observation series that began in 1973. After digitalization process and quality control tasks, we show preliminary results of this phenological series, and we compare them with those of similar European series. We show the evolution trends for different observed species, such as almond tree (Prunus dulcis), hazel (Corylus avellana), plum (Prunus domestica), olive tree (Olea europea), apple tree (Malus domestica) or vineyard (Vitis vinifera).

  15. Geochemical and isotopic evidence for the petrogenesis and emplacement tectonics of the Serra dos Órgãos batholith in the Ribeira belt, Rio de Janeiro, Brazil

    NASA Astrophysics Data System (ADS)

    Machado, Rômulo; Philipp, Ruy Paulo; McReath, Ian; Peucat, Jean Jacques

    2016-07-01

    The Serra dos Órgãos batholith in the State of Rio de Janeiro (Brazil) is a NE-SW-trending elongated body that occupies ca. 5000 km2 in plan view. It is a foliated intrusion, especially at its borders and is crosscut by syn-magmatic shear zones, with foliations that are moderately-to steeply-dipping to the northwest and moderately-to shallow-dipping in the center and to the southeast, in a configuration of a large laccolith. It was emplaced between 560 and 570 Ma, during an extensional episode that was part of a series of events that comprise the Brasiliano Orogeny in SE Brazil, and which includes deformation, metamorphism and granite intrusion during the interval between 630 and 480 Ma. The two main rock types in the batholith are biotite-hornblende monzogranite, and biotite leucogranite, with subordinate tonalite, granodiorite, diorite, quartz diorite (enclaves), aplite and pegmatite. Harker-type diagrams help show two rock groups with similar trends of evolution: a dioritic and a granitic. The first one is tholeiitic, whereas the second is calc-alkaline, with medium-to high-K calc-alkaline affinity and metaluminous to slightly peraluminous character. In both groups strong decrease in Al2O3, MgO, FeOT and CaO relative to silica contents are observed, which is compatible with trends of fractional crystallization involving clinopyroxene and/or hornblende, plagioclase, opaque minerals, apatite, microcline and biotite. The Sr and Nd isotopic data suggest recycling of a Paleoproterozoic crust as an important petrological process to generate the batholith rocks. Geothermometry (amphibole composition) and geobarometry (saturation in zircon and apatite) indicate that most of the batholith solidified at mid to lower crustal levels at about 750 °C and between 5 and 5.5 kbar. We consider that Serra dos Órgãos crustal protoliths underwent melting caused by the interaction with hotter mafic magma at the base of the crust. These two magmas, with distinct initial

  16. Endemic and threatened tetrapods in the restingas of the biodiversity corridors of Serra do Mar and of the Central da Mata Atlântica in eastern Brazil.

    PubMed

    Rocha, C F D; Van Sluys, M; Bergallo, H G; Alves, M A S

    2005-02-01

    Biodiversity corridors comprise a mosaic of land uses connecting fragments of natural forest across a landscape. Two such corridors have been established along the eastern coast of Brazil: the Serra do Mar and the Central da Mata Atlântica corridors, along which most of the coastal plains are restinga areas. In this study, we analyze the present status of the endemic and endangered terrestrial vertebrates of both corridors. We sampled 10 restingas in both corridors, recording species of amphibians, reptiles, birds, and mammals. Some restingas harbor a relatively large number of endemic species,and two main regions of endemism can be identified along the restingas of both corridors: the coastal restingas from northern Espirito Santo State to southern Bahia State (between Linhares, ES, and Tarancoso, BA), and the coastal region between the restingas of Maricá and Jurubatiba, Rio de Janeiro State. Six species of terrestrial vertebrates considered threatened with extinction are found in the restingas of Serra do Mar and Central da Mata Atlântica biodiversity corridors (Liolaemus lutzae, Formicivora littoralis, Mimus gilvus, Schistochlamys melanopis, and Trinomys eliasi). The region located between the restinga of Maricá and that of Jurubatiba is of special relevance for the conservation of vertebrate species of the restingas of the corridors because a considerable number of threatened species of terrestrial vertebrates are found there. We strongly recommend efforts to develop checklists of threatened faunas for the States of Espirito Santo and Bahia.

  17. Geodiversity, Geoturism and Geoconservation: Trails in Serra da Bocaina National Park, Rio de Janeiro State, Brazil.

    NASA Astrophysics Data System (ADS)

    Santos Filho, Raphael; Guerra, Antonio; Fullen, Michael; do Carmo Jorge, Maria

    2015-04-01

    The human being has always been concerned with the preservation of memory, of cultural heritage. Only now he started to protect its natural heritage and the immediate environment. It is time to learn how to protect the Earth's past and, through this protection and learn to know it. This memory comes before the human memory. It is a new asset: the geological heritage, a book written long before our appearance on the Planet (...)"(IPHAN, 2014). Since the XXth century, Brazilian geographers (GUERRA, 1980; AB'SABER, 2003 and others) dedicated to carry out research on the relationship of geographical knowledge between the environment and society. On the other hand, Brazil is a signatory of the Convention for the Protection of the World Heritage Cultural and Natural (UNESCO, 1972), where the nations recognize to keep under their responsibility the conservation, to the rest of humanity and future generations, goods of exceptional value situated within its territorial limits, considered as World Heritage. Under this perspective, it is proposed here a survey on the environmental impacts, resulting from the human activities that directly or indirectly affect the health, safety and welfare of the population; social and economic activities; the biota; the aesthetic and sanitary conditions of the environment; the quality of the environment (CONAMA Resolution 001/86) - and resulting geotourism practiced on trails - paths for pedestrians, cyclists and animals, existing in the protected area of the Serra da Bocaina National Park, in Rio de Janeiro State, such as unplanned use, erosive features, presence of litter, graffiti and burned, degraded areas on the trails indicating the need for recovery (drainage, etc.). This survey is based on research work of the environmental degradation and analysis undertaken by the Laboratory of Environmental Geomorphology and Soils Degradation (LAGESOLOS / UFRJ) in the area, in order to contribute to the geoconservation, so that the encountered

  18. The sandfly fauna (Diptera: Psychodidae: Phlebotominae) of the Parque Estadual da Serra da Tiririca, Rio de Janeiro, Brazil.

    PubMed

    Rodrigues, Andressa Alencastre Fuzari; Barbosa, Vanessa de Araújo; Andrade Filho, José Dilermando; Brazil, Reginaldo Peçanha

    2013-11-01

    Cutaneous leishmaniasis (CL) in the state of Rio de Janeiro is sporadic and can be characterised as a peridomestic transmission that occurs in modified natural environments. The aim of this work was to study the fauna and ecological characteristics of sandflies in an environmentally protected area (the State Park of Serra da Tiririca) within the remnants of the Atlantic Forest in the municipalities of Niterói and Maricá and their possible relationship with leishmaniasis. Captures were performed using light traps during the night once a month for one year in both sylvatic environments and areas surrounding homes near the park. A total of 1,037 sandflies were captured, belonging to nine genera and 12 species: Evandromyia tupynambai (34.1%), Migonemyia migonei (20.6%), Brumptomyia cunhai (13.8%), Micropygomyia schreiberi (9.7%), Psathyromyia lanei (6.5%), Brumptomyia nitzulescui (5.7%), Evandromyia edwardsi (5.4%), Nyssomyia intermedia (2.8%), Evandromyia cortelezzii (0.6%), Pintomyia bianchigalatiae (0.5%), Lutzomyia longipalpis (0.2%) and Sciopemyia microps (0.1%). Both Mg. migonei and Ny. intermedia may be acting as vectors of CL in this area.

  19. Novel bisabolane derivative from "arnica-da-serra" (Vernonieae: Asteraceae) reduces pro-nociceptive cytokines levels in LPS-stimulated rat macrophages.

    PubMed

    Petinatti Pavarini, Daniel; Nogueira, Elídia Fernandes; Callejon, Daniel Roberto; Soares, Denis Melo; de Souza, Glória Emilia Petto; Cunha, Fernando de Queiroz; Lopes, João L C; Lopes, Norberto Peporine

    2013-07-30

    Hydro alcoholic leaves extracts (HALE) of Lychnophora ericoides Mart. ("false arnica" or "arnica-da-serra") had been popularly used against pain and inflammatory process. The present work aimed to look for possible active volatile compounds that could be found in HALE of Lychnophora ericoides among the non volatile anti-inflammatory and analgesic compounds previously reported. Harvests were performed during the end of the wet summer season (April) when scented branches were instantly collected and frozen. HALE's were simulated at the lab by following the procedures lectured by the locals. Mass Spectrometry experiments suggested structural information when using both EI-MS and ESI-MS/MS. After isolation through classical thin layer chromatography (TLC) procedures, the NMR experiments and signals assignments were carried out. The effects on the cytokines or nitric oxide (NO) production were assessed at in vitro assays that had monitored the levels of these substances on the supernatant of LPS-stimulated macrophage primary cell culture. The major metabolite from HALE was isolated from the essential oil and the major compound had its molecular formulae established by Mass Spectrometry (High Resolution) and its structure by NMR. Literature-based investigation enables us to define the structure of the new metabolite as 6-methyl-2-(4-methylcyclohex-4-enyl-2-acetyloxy) hept-5-en-2-ol and its name as orto-acetoxy-bisabolol. In vitro assay of interleukins release inhibition was carried out using rat peritoneal macrophages cultures. IL-1β and TNF-α levels were significantly reduced when cells were previously treated with low doses of orto-acetoxy-bisabolol, but neither IL-6 nor NO levels have their levels reduced. Results suggest that ethnical knowledge of anti-inflammatory and analgesic effects of the "arnica-da-serra" HALE may be associated to the orto-acetoxy-bisabolol ability on synthesis inhibition of the key inflammatory/hypernociceptive mediators. Phytochemical

  20. Multiseasonal and geobotanical approach in remote detection of greisenization areas in the Serra da Pedra Branca Granite, Goias State, Brazil

    NASA Technical Reports Server (NTRS)

    Parada, N. D. J. (Principal Investigator); Almeidafilho, R.

    1983-01-01

    Multiseasonal analysis of LANDSAT multispectral images in CCT format permitted the mapping of lithologic facies in the Pedra Branca Granite, using geobotanical associations, which occur in the form of variations in the density of cerrado vegetation, as well as the predominance of certain distinctive vegetation species. Dry season images did not show very good results in lithological differentiation due to anomalous illumination conditions related to the low solar elevation and the homogeneity in the vegetation cover, specially the grasses that become dry during this season. Rainy season image, on the other hand, allowed the separation of the lithological types, a fact that can be attributed to a greater differentiation among the geobotanical associations. As a result of this study, the muscovite-granite facies with greisenization zones, which are lithological indicators of important tin mineralization within the Serra da Pedra Branca Granite, were mapped. This methodology can be sucessfully applied to similar known granite bodies elsewhere in the Tin Province of Goias.

  1. Chestnut and lemon balm based ingredients as natural preserving agents of the nutritional profile in matured "Serra da Estrela" cheese.

    PubMed

    Carocho, Márcio; Barreira, João C M; Bento, Albino; Fernández-Ruiz, Virginia; Morales, Patricia; Ferreira, Isabel C F R

    2016-08-01

    Chestnut flowers, lemon balm plants and their decoctions were incorporated into "Serra da Estrela" cheese, to assess their potential to preserve its nutritional properties and provide new foodstuffs. The analyses were carried out after the normal ripening period of 1month and after 6months of storage. The most abundant nutrients were proteins and fats. The most abundant minerals were Ca and Na, while C16:0 and C18:1 were the main fatty acids. Saturated fatty acids were the most abundant, followed by the monounsaturated. Moisture seemed to be lower in the samples with the plants incorporated. The dried plants, when incorporated, seemed to be more efficient as preservers then the decoctions, although these better preserved the proteins. These plants can be regarded as promising natural preservers in foodstuffs cheese, given the preservation of key parameters and the slight impact on the nutritional value. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Dating of fossil human teeth and shells from Toca do Enoque site at Serra das Confusões National Park, Brazil.

    PubMed

    Kinoshita, Angela; Sullasi, Henry L; Asfora, Viviane K; Azevedo, Renata L; Guzzo, Pedro; Guidon, Niede; Figueiredo, Ana Maria G; Khoury, Helen; Pessis, Anne-Marie; Baffa, Oswaldo

    2016-06-07

    This work reports the dating of a fossil human tooth and shell found at the archaeological site Toca do Enoque located in Serra das Confusões National Park (Piauí, Brazil). Many prehistoric paintings have been found at this site. An archaeological excavation unearthed three sepulchers with human skeletons and some shells. Two Brazilian laboratories, in Ribeirão Preto (USP) and Recife (UFPE), independently performed Electron Spin Resonance (ESR) measurements to date the tooth and the shell and obtain the equivalent dose received by each sample. The laboratories determined similar ages for the tooth and the shell (~4.8 kyBP). The results agreed with C-14 dating of the shell and other samples (charcoal) collected in the same sepulcher. Therefore, this work provides a valid inter-comparison of results by two independent ESR-dating laboratories and between two dating methods; i.e., C-14 and ESR, showing the validity of ESR dating for this range of ages.

  3. Multitemporal and geobotanical approach in the remote detection of Greisenization areas in the Serra da Pedra Branca Granite, Goias State, Brazil

    NASA Technical Reports Server (NTRS)

    Parada, N. D. J. (Principal Investigator); Filho, R. A.

    1982-01-01

    A multiseasonal analysis of LANDSAT multispectral images in CCT format permitted the mapping of lithologic facies in the Pedra Branca Granite, using geobotanical associations, which occur in the form of variations in the density of the cerrado vegetation, as well as the predominance of certain distinct vegetation species. Dry season images did not show very good results in lithological differentiation due to anomalous illumination conditions related to the low solar elevation and the homogeneity in the vegetation cover, specially the grass that becomes dry during this season. Rainy season images, on the other hand, allowed the separation of the lithological types, a fact that can be attributed to a greater differentiation among the geobotanical associations. The muscovite-granite facies with greisenization zones within the Serra da Pedra Branca were mapped. This methodology can be successfully applied to similar known granite bodies elsewhere in the Tin Province of Goias.

  4. Fluid inclusions in calcite filled opening fractures of the Serra Alta Formation reveal paleotemperatures and composition of diagenetic fluids percolating Permian shales of the Paraná Basin

    NASA Astrophysics Data System (ADS)

    Teixeira, C. A. S.; Sawakuchi, A. O.; Bello, R. M. S.; Nomura, S. F.; Bertassoli, D. J.; Chamani, M. A. C.

    2018-07-01

    The thermal and diagenetic evolution of shale units has received renewed focus because of their emergence as unconventional hydrocarbon reservoirs. The Serra Alta Formation (SAF) is a Permian shale unit of the Paraná Basin, which is the largest South American cratonic basin. The SAF stands out as a pathway for aqueous fluids and hydrocarbon migration from the Irati organic-rich shales to the Pirambóia fluvial-eolian sandstone reservoirs. Vertical NNW and NNE opening fractures would be the main pathways for the migration of buried pore waters and aqueous fluids, besides the input of meteoric water. These fractures would be associated to the reactivation of basement discontinuities such as the Jacutinga (NE) and Guapiara (NW) faults. Thus, vertical NNE and NNW associated fractures would represent the main pathways for fluid migration in the studied area. The vertical calcite filled opening fractures from SAF record moderately low salinity (0-4.5 wt % of NaCl eq.) aqueous fluids, suggesting the input of meteoric water in the buried fracture system. Eutectic melting temperatures at -52±5 °C indicate an H2O + NaCl + CaCl2 system with CaCl2 or MgCl2 in solution. Homogenization temperatures recorded in fluid inclusion assemblages (FIAs) of calcite filled opening fractures indicate that the SAF in the studied area reached temperatures above 200 °C, suitable for generation of gaseous hydrocarbons. The recorded paleotemperatures point to a thermal peak associated with Serra Geral volcanic event during the Early Cretaceous, with the thermal effect of volcanic rock cap possibly overcoming the effect of intrusive igneous bodies. The detection of methane in SAF shale pores indicates conditions for hydrocarbon generation. However, additionally studies are necessary to confirm the thermogenic and/or biogenic origin of the methane within the SAF.

  5. Gastrointestinal parasites among felids inhabiting the Serra dos Órgãos National Park, Rio de Janeiro, Brazil.

    PubMed

    Dib, Laís Verdan; Cronemberger, Cecília; Pereira, Fabiane de Aguiar; Bolais, Paula Forain; Uchôa, Claudia Maria Antunes; Bastos, Otilio Machado Pereira; Amendoeira, Maria Regina Reis; Barbosa, Alynne da Silva

    2018-05-24

    This study aimed to investigate the species of felids that inhabit the Serra dos Órgãos National Park (Parnaso) and gastrointestinal parasites at various stages of their life cycles in the feces of these animals. Between 2013 and 2015, felid feces were collected from trails in Parnaso. The sampling points were georeferenced. A total of 82 fecal samples were processed, of which 79 were collected on the ground, two from captured felids and one from a necropsied animal. All samples underwent coproparasitological techniques. Samples collected from the environment underwent additional trichological analysis. Fur patterns corresponding to Leopardus guttulus, Leopardus pardalis, Leopardus wiedii and Puma yagouaroundi were observed in 32 of the samples collected on the soil. High frequency of potentially parasitic evolving forms (88.6%) was observed in felid feces, particularly eggs of the family Diphyllobothriidae (68.6%). Besides, were also detected, eggs of superfamily Ascaridoidea (42.9%), nematode larvae (28.6%), eggs of order Strongylida (28.6%), Capillaria sp. (8.6%), Trichuris sp. (8.6%), eggs of order Spirurida (2.9%), unsporulated coccidian oocysts (8.6%) and Eimeria sp. (2.9%). Felid feces presented higher frequency of polyparasitism (60%) than monoparasitism (28.6%).

  6. Morphology and morphometry of upland lakes over lateritic crust, Serra dos Carajás, southeastern Amazon region.

    PubMed

    Silva, Marcio S DA; Guimarães, José T F; Souza Filho, Pedro W M; Nascimento Júnior, Wilson; Sahoo, Prafulla K; Costa, Francisco R DA; Silva Júnior, Renato O; Rodrigues, Tarcísio M; Costa, Marlene F DA

    2018-01-01

    High-resolution satellite images, digital elevation models, bathymetric and sedimentological surveys coupled with statistical analysis were used to understand the physical environment and discuss their influence on water quality of the five upland lakes of Serra Sul dos Carajás, southeast Amazonia. The lakes have mid-altitude ranges (elevation), very small (catchment) and shallow to very shallow (central basins). Based on the length, area and volume, Violão and TI (Três Irmãs)-3 lakes may present large vertical movements of the water due to wind action and weakly stratified waters. Trophic conditions based on depth and shore development (Ld) parameters must be used with caution, since Amendoim Lake is relatively deep, but it is oligotrophic to ultra-oligotrophic. Ld values suggest that the lakes are circular to subcircular and are likely formed by solution process, as also suggested by volume development. TI-2 Lake is only presenting convex central basin and has highest dynamic ratio (DR), thus it may have high sedimentation and erosion rates. Based on the relationship between studied parameters, morphometric index and DR likely influence temperature and dissolved oxygen of waters of TI-2 Lake due to its depth profile and wind-induced surface mixing. Nevertheless, water quality parameters are controlled by catchment characteristics of the lakes.

  7. Characteristical analysis of high school astronomy's learning in Rio Grande da Serra, Ribeirão Pires and Mauá

    NASA Astrophysics Data System (ADS)

    Faria, R. Z.; Voelzke, M. R.

    Even though astronomy is one of the oldest science that contributes to the human and thecnological development, its concepts are rarely taught for students of high school. The present research discusses two aspects related to the teaching of astronomy. The first aspect is to know whether astronomy is discussed in high school classes and the second on is related to the way how teachers approach astronomy. In order to find out this, a questionnaire was applied for the teachers who teach physics classes and work in state schools in Rio Grande da Serra, Ribeirão Pires and Mauá in São Paulo. From 66.2% of the teachers who answered to the questionnaire in the three chosen cities, 57.4% did not discuss any subject about astronomy, 89.4% did not use any kind of computer program, 70.2% did not use laboratory, 83.0% never took the students for museums or observatories and 38.3% did not indicate any kind magazine or book about astronomy. Although the majority of the teachers admit that the astronomy content influences the education of the student, they do not include the subject in their planning.

  8. Suitability aero-geophysical methods for generating conceptual soil maps and their use in the modeling of process-related susceptibility maps

    NASA Astrophysics Data System (ADS)

    Tilch, Nils; Römer, Alexander; Jochum, Birgit; Schattauer, Ingrid

    2014-05-01

    In the past years, several times large-scale disasters occurred in Austria, which were characterized not only by flooding, but also by numerous shallow landslides and debris flows. Therefore, for the purpose of risk prevention, national and regional authorities also require more objective and realistic maps with information about spatially variable susceptibility of the geosphere for hazard-relevant gravitational mass movements. There are many and various proven methods and models (e.g. neural networks, logistic regression, heuristic methods) available to create such process-related (e.g. flat gravitational mass movements in soil) suszeptibility maps. But numerous national and international studies show a dependence of the suitability of a method on the quality of process data and parameter maps (f.e. Tilch & Schwarz 2011, Schwarz & Tilch 2011). In this case, it is important that also maps with detailed and process-oriented information on the process-relevant geosphere will be considered. One major disadvantage is that only occasionally area-wide process-relevant information exists. Similarly, in Austria often only soil maps for treeless areas are available. However, in almost all previous studies, randomly existing geological and geotechnical maps were used, which often have been specially adapted to the issues and objectives. This is one reason why very often conceptual soil maps must be derived from geological maps with only hard rock information, which often have a rather low quality. Based on these maps, for example, adjacent areas of different geological composition and process-relevant physical properties are razor sharp delineated, which in nature appears quite rarly. In order to obtain more realistic information about the spatial variability of the process-relevant geosphere (soil cover) and its physical properties, aerogeophysical measurements (electromagnetic, radiometric), carried out by helicopter, from different regions of Austria were interpreted

  9. Characteristical Analysis of High School Astronomy's Teaching in Rio Grande da Serra, Ribeirão Pires and Mauá

    NASA Astrophysics Data System (ADS)

    Faria, R. Z.

    2008-08-01

    Considering that Astronomy is one of the oldest science that contributes to the human and technological development, its concepts are rarely taught for students of High School. The present research argues two aspects related to the method of teaching Astronomy. The first aspect is if it has been discussed in the classes by teachers of High School, and the second one treats of the way it has been taught by these teachers. In order to find out this, a questionnaire was applied for the teachers who teach Physics classes and work in state schools in Rio Grande da Serra, Ribeirão Pires and Mauá in São Paulo. From 66.2% of the teachers who answered to the questionnaire in the three cities researched, 57.4% did not give any subject about Astronomy, 89.4% did not use any kind of computer program, 70.2% did not use laboratory, 83.0% never took the students for museums or observatories and 38.3% did not indicate any kind of magazine or book about Astronomy. Although the majority of the teachers admit that the Astronomy influence the education of the student, they do not include the subject in their planning.

  10. Holocene history of a lake filling and vegetation dynamics of the Serra Sul dos Carajás, southeast Amazonia.

    PubMed

    Guimarães, José T F; Sahoo, Prafulla K; Souza-Filho, Pedro W M; Figueiredo, Mariana M J Costa DE; Reis, Luiza S; Silva, Marcio S DA; Rodrigues, Tarcísio M

    2017-07-24

    Down-core changes in sedimentary facies, elemental geochemistry, pollen, spore, δ13C, δ15N and radiocarbon records from a filled lake, named R4, of the Serra Sul dos Carajás were used to study the relationship between the paleomorphological and paleoecological processes and their significance for Holocene paleoclimatology of the southeast Amazonia. The sediment deposition of the R4 lake started around 9500 cal yr BP. Increase of detrital components from 9500 to 7000 cal yr BP suggests high weathering of surrounding catchment rocks and soils, and deposition into the lake basin under mudflows. At that time, montane savanna and forest formation were already established suggesting predominance of wet climate. However, from 7000 to 3000 cal yr BP, a decline of detrital input occurred. Also, forest formation and pteridophytes were declined, while palms and macrophytes were remained relatively stable, indicating that water levels of the lake is likely dropped allowing the development of plants adapted to subaerial condition under drier climate conditions. After 3000 cal yr BP, eutrophication and low accommodation space lead to high lake productivity and the final stage of the lake filling respectively, and forest formation may has acquired its current structure, which suggests return of wetter climate conditions.

  11. Comparison of the social systems of primates and feral horses: data from a newly established horse research site on Serra D'Arga, northern Portugal.

    PubMed

    Ringhofer, Monamie; Inoue, Sota; Mendonça, Renata S; Pereira, Carlos; Matsuzawa, Tetsuro; Hirata, Satoshi; Yamamoto, Shinya

    2017-10-01

    Horses are phylogenetically distant from primates, but considerable behavioral links exist between the two. The sociality of horses, characterized by group stability, is similar to that of primates, but different from that of many other ungulates. Although horses and primates are good models for exploring the evolution of societies in human and non-human animals, fewer studies have been conducted on the social system of horses than primates. Here, we investigated the social system of feral horses, particularly the determinant factors of single-male/multi-male group dichotomy, in light of hypotheses derived from studies of primate societies. Socioecological data from 26 groups comprising 208 feral horses on Serra D'Arga, northern Portugal suggest that these primate-based hypotheses cannot adequately explain the social system of horses. In view of the sympatric existence of multi- and single-male groups, and the frequent intergroup transfers and promiscuous mating of females with males of different groups, male-female relationships of horses appear to differ from those of polygynous primates.

  12. Mercury fluxes in a natural forested Amazonian catchment (Serra do Navio, Amapá State, Brazil).

    PubMed

    Fostier, A H; Forti, M C; Guimarães, J R; Melfi, A J; Boulet, R; Espirito Santo, C M; Krug, F J

    2000-10-09

    Mercury (Hg total) fluxes were calculated for rainwater, throughfall and stream water in a small catchment located in the northeastern region of the Brazilian Amazon (Serra do Navio, Amapá State), whose upper part is covered by a natural rainforest and lower part was altered due to deforestation and activities related to manganese mining. The catchment area is 200 km from the nearest gold mining (garimpo). Minimum and maximum Hg concentrations were measured monthly from October 1996 to September 1997 and were 3.5-23.4 ng l(-1) for rainwater, 16.5-82.7 ng l(-1) for throughfall (March-August 1997) and 1.2-6.1 and 4.2-18.8 ng l(-1) for stream water, in natural and disturbed areas, respectively. In the natural area, the inputs were 18.2 microg m 2 year(-1) in rainwater and 72 microg m(-2) year(-1) in throughfall. This enrichment was attributed to dry deposition. The stream output of 2.9 microg m(-2) year(-1) indicates that Hg is being recycled within the forest as other chemical species or is being retained by the soil system, as confirmed by the cumulative Hg burden in the 0-10 cm surface layer, which was 36480 microg m(-2). When the disturbed area of the catchment was included, the stream output was 9.3 microg m(-2), clearly indicating the impact of the deforestation of the lower part of the basin on the release of mercury. The Hg burden in the disturbed area was 7560 microg m(-2) for the 0-10 cm surface layer.

  13. BABOC: A new project aimed at analysing geological boundary conditions for the East Antarctic Ice Sheet in the Wilkes Subglacial Basin

    NASA Astrophysics Data System (ADS)

    Armadillo, Egidio; Ferraccioli, Fausto; Balbi, Pietro; Jordan, Tom; Young, Duncan; Blankenship, Don; Bozzo, Emanuele; Siegert, Martin

    2013-04-01

    -age rifted crust and; iii) its bedrock is composed of a variety of rocks of different ages and bulk composition, including inferred Proterozoic basement, Neoproterozoic and Cambrian sediments intruded by Cambrian arc rocks, and cover rocks formed primarily by Beacon sediments intruded by Ferrar sills of Jurassic age. Within the framework of the collaborative Italian-US-UK BABOC project a new initiative has been launched to analyse and model variable geological boundary conditions in the Wilkes Basin, by analysing both new and existing geophysical data. A couple of new flights over the region were flown by the ICECAP team for BABOC during the 2010-11 field campaign from Mario Zucchelli Station. ICECAP independently acquired a suite of extensive aerogeophysical observations over three campaigns, centred in particular over the southern part of the basin, and some new profiles over the northern coastal margin of the basin. We present an initial analyses and interpretation of the potential field signatures over the different parts of the basin and assess regional geological controls on the subglacial topography of the basin.

  14. Linking Community Communication to Conservation of the Maned Wolf in Central Brazil

    ERIC Educational Resources Information Center

    Bizerril, Marcelo Ximenes A.; Soares, Carla Cruz; Santos, Jean Pierre

    2011-01-01

    This article describes the environmental education (EE) program developed in the neighboring community of Serra da Canastra National Park based on a research project focused on the maned wolf conservation. The article assesses three tools used to foster the community's participation in discussing local issues: (1) communal production of a book…

  15. The influence of fire on the assemblage structure of foraging birds in grasslands of the Serra da Canastra National Park, Brazil.

    PubMed

    Reis, Matheus G; Fieker, Carolline Z; Dias, Manoel M

    2016-05-13

    Grasslands are the most threatened physiognomies of the Cerrado biome (Brazilian savanna), a biodiversity hotspot with conservation as a priority. The Serra da Canastra National Park protects the most important remnants of the Cerrado's southern grasslands, which are under strong anthropogenic pressure. The present study describes the structure of bird assemblages that directly use food resources in burned areas, comparing areas affected by natural fire to the areas where controlled fires were set (a management strategy to combat arson). The tested null hypothesis was that different bird assemblages are structured in a similar manner, regardless of the post-fire period or assessed area. Between December/2012 and January/2015, 92 species were recorded foraging in the study areas. The results indicate that both types of burnings triggered profound and immediate changes in bird assemblages, increasing the number of species and individuals. Natural fires exhibited a more significant influence on the structure (diversity and dominance) than prescribed burnings. Nevertheless, all the differences were no longer noticeable after a relatively short time interval of 2-3 months after prescribed burnings and 3-4 after natural fires. The findings may help the understanding of prescribed burnings as a management strategy for bird conservation in grasslands.

  16. Nitrogen and Phosphorous Flow in Atlantic Forest Covered Watersheds on the Oceanic and Continental Slopes at Serra dos Órgãos mountain, Southeast of Brazil

    NASA Astrophysics Data System (ADS)

    Vidal, M. M.; De Souza, P.; De Mello, W. Z.; Damaceno, I.; Bourseau, L.; Rodrigues, R. D. A.; Mattos, B. B.

    2017-12-01

    Concentration of nutrients above natural levels are found even at remote or protected environments due to atmospheric transportation from biomass burning emissions, urban and industrial areas. This study evaluate N and P atmospheric deposition at the oceanic and continental slopes of Serra dos Órgãos mountain, which are influenced by the pollutants emission from the Metropolitan Region of Rio de Janeiro. Flux of dissolved forms of N and P were measured in three watersheds in headwaters of Piabanha basin, southeastern Brazil, to understand the dynamics of the biogeochemical processes of these elements, related to anthropic influences of atmospheric inputs and export via stream flow. Samples of bulk precipitation (weekly; n=47) and stream water (monthly; n=13) were collected along one year (Sept 2014 - Sept 2015). During that period the annual rainfall in the oceanic slope (2163 mm) was the double of the continental one. It is important to stress that the rainfall in the oceanic slope was 13 % and 28% in 2014/15, respectively, lower than the long term average. Atmospheric deposition of total dissolved nitrogen (TDN) on the oceanic and continental slopes were, respectively, 15 and 8.6 kg N ha-1 year-1. The TDN outputs by stream water were 5-7 times lower in oceanic slope and 28 times lower on the continental one. The relative contribution of dissolved organic nitrogen (DON; 65%-70%) was higher than the one of dissolved inorganic nitrogen (DIN; 30-35%) to TDN deposition. Atmospheric deposition of total dissolved phosphorus (TDP) in oceanic and continental slopes were 1.4 and 0.95 kg P ha-1 year-1. Dissolved Organic Phosphorus (DOP; 89-96%) was higher than the inorganic one (PO43-; 5-11%). TDP outputs were 2-4 times lower, regarding to atmospheric contribution. The contribution of DOP (73-77 %) was higher than DIP (23-27 %). Results show variations in quantities and forms of N and P species due to natural and anthropogenic processes which contribute to the cycling of

  17. Petrography and chemistry of SiO 2 filling phases in the amethyst geodes from the Serra Geral Formation deposit, Rio Grande do Sul, Brazil

    NASA Astrophysics Data System (ADS)

    Commin-Fischer, Adriane; Berger, Gilles; Polvé, Mireille; Dubois, Michel; Sardini, Paul; Beaufort, Daniel; Formoso, Milton

    2010-04-01

    The filling process of amethyst-bearing geodes from Serra Geral Formation basalts, Brazil, is investigated by different methods performed on the SiO 2 filling phases. Image analysis of quartz-amethyst deposits suggests a single growing mechanism ruled by geometric selection of randomly oriented crystals. Microthermometry of fluid inclusions reveals formation temperature lower than 100 °C, probably lower than 50 °C, and fluid salinity as high as 3 mass% NaCl eq. Composition in REE and trace-elements measured by ICP-MS on acid-digested or laser-ablated samples indicates a common genesis for amethyst, quartz and chalcedony, as well as the absence of significant variations from one geode to another. 87Sr/ 86Sr data on chalcedony shows that both the host basalt or the Botucatu sandstone are possible silica sources. These data, combined with thermo-kinetic considerations, permit us to discuss the filling process. We argue in favor of the contribution of a mineralized fluid of hydrothermal origin producing a regional silica source which decreased with time. The observed mineral sequence is related to the depletion of silica in the solution.

  18. The orchid-bee faunas (Hymenoptera: Apidae) of "Reserva Ecológica Michelin", "RPPN Serra Bonita" and one Atlantic Forest remnant in the state of Bahia, Brazil, with new geographic records.

    PubMed

    Nemésio, A

    2014-02-01

    The orchid bee faunas of two private natural preserves, 'Reserva Particular do Patrimônio Natural da Serra Bonita' (RSB) and 'Reserva Ecológica Michelin' (REM), and a forest fragment inside the campus of the 'Universidade Estadual de Santa Cruz', were surveyed for the first time. All three areas constitute Atlantic Forest remnants in the southern portion of the state of Bahia, Brazil. A total of 1,782 males belonging to 32 species were actively collected with insect nets during 90 hours of field work from November, 2009, to January, 2012. Euglossa cyanochlora Moure, 1996-one of the rarest orchid bee species-was found at RSB and REM, the latter representing the northernmost record for this species. Euglossa cognata, Moure, 1970 was found at RSB, the northernmost record for this species in the Atlantic Forest and the only recent record for this species at the northern border of Jequitinhonha river.

  19. A Multi-Sensor Aerogeophysical Study of Afghanistan

    DTIC Science & Technology

    2007-01-01

    magnetometer coupled with an Applied Physics 539 3-axis fluxgate mag- netometer for compensation of the aircraft field; • an Applanix DSS 301 digital...survey. DATA COlleCTION AND PROCeSSINg Photogrammetry More than 65,000 high-resolution photogram- metric images were collected using an Applanix Digital...HSI L-Band Polarimetric Imaging Radar KGPS Dual Gravity Meters Common Sensor Bomb-bay Pallet Applanix DSS Camera Sensor Suite • Magnetometer • Gravity

  20. Low-Altitude Long-Endurance Solar Unmanned Plane for Forest Fire Prevention: Application to the Natural Park of Serra do Xures (spain)

    NASA Astrophysics Data System (ADS)

    González-Jorge, H.; Bueno, M.; Martínez-Sánchez, J.; Arias, P.

    2017-08-01

    Unamnned aerial systems (UAS) show great potential in operations related to surveillance. These systems can be successfully applied to the prevention of forest fires, especially those caused by human intervention. The present works focuses on a study of the operational possibilities of the unmanned system "AtlantikSolar" developed by the ETH Zurich for the prevention of forest fires in the Spanish natural park of Serra do Xurés, an area of 20,920 ha with height variations between 300 m and 1,500 m. The operation evaluation of AtlantikSolar is based on the use of Flir Tau 2 LWIR camera as imaging payload which could detect illegal activities in the forest, such as bonfires, uncontrolled burning or pyromaniacs. Flight surveillance is planned for an altitude of 100 m to obey the legal limit of the Spanish UAS regulation. This altitude produces a swath width of 346.4 m and pixel resolution between 1.5 and 1.8 pixels/m. Operation is planned to adapt altitude to the change on the topography and obtain a constant ground resolution. Operational speed is selected to 52 km/h. The UAS trajectory is adapted to the limits of the natural park and the border between Spain and Portugal. Matlab code is developed for mission planning. The complete surveillance of the natural park requires a total time of 15.6 hours for a distance of 811.6 km.

  1. Combining lead isotopes and cluster analysis to distinguish the Guarani and Serra Geral Aquifer Systems and contaminated waters in a highly industrialized area in Southern Brazil.

    PubMed

    Kuhn, Isadora Aumond; Roisenberg, Ari

    2017-10-01

    The Rio dos Sinos Watershed area is located at the Middle-West region of the Rio Grande do Sul State, Southern Brazil, along thirty two municipalities and affecting 1.5 million inhabitants and many important industrial centers. Three main aquifers are recognized in the study area: the unconfined-fractured Serra Geral Aquifer System, the porous Guarani Aquifer System, and the Permian Aquitard. This study aims to understand groundwater, surface water and human activity interactions in the Rio dos Sinos Watershed, evaluating the application of stable lead isotopic ratios analyzed for this propose. Thirty six groundwater samples, 8 surface water samples and 5 liquid effluents of tanneries and landfills samples were measured using a Thermal Ionization Mass Spectrometer Thermo-Finnigan and a Neptune Multi-Collector Inductively Coupled Plasma Mass Spectrometer. Groundwater isotopic ratios have a wider range compared to the surface water, with less radiogenic averages 208 Pb/ 204 Pb = 38.1837 vs 38.4050 (standard deviation = 0.2921 vs 0.1343) and 206 Pb/ 204 Pb = 18.2947 vs 18.4766 (standard deviation = 0.2215 vs 0.1059), respectively. Industrial liquid effluents (tanneries and industrial landfill) have averages 208 Pb/ 204 Pb = 38.1956 and 206 Pb/ 204 Pb = 18.3169, distinct from effluent samples of domestic sanitary landfill (averages 208 Pb/ 204 Pb = 38.2353 and 206 Pb/ 204 Pb = 18.6607). Hierarchical cluster analysis led to distinguish six groups of groundwater, representing the three aquifers that occur in the area, two clusters suggesting groundwater mixtures and one demonstrating a highly contaminated groundwater. By analyzing the cluster results and wells' stratigraphic profiles it was possible to distinguish the different aquifers in the area. The Serra Geral Aquifer System has 206 Pb/ 204 Pb ratios between 18.4718 and 18.7089; 207 Pb/ 204 Pb between 15.6692 and 15.6777; 208 Pb/ 204 Pb between 38.6826 and 38.7616; 207 Pb/ 206 Pb between 0.8372 and 0

  2. Relevant principal component analysis applied to the characterisation of Portuguese heather honey.

    PubMed

    Martins, Rui C; Lopes, Victor V; Valentão, Patrícia; Carvalho, João C M F; Isabel, Paulo; Amaral, Maria T; Batista, Maria T; Andrade, Paula B; Silva, Branca M

    2008-01-01

    The main purpose of this study was the characterisation of 'Serra da Lousã' heather honey by using novel statistical methodology, relevant principal component analysis, in order to assess the correlations between production year, locality and composition. Herein, we also report its chemical composition in terms of sugars, glycerol and ethanol, and physicochemical parameters. Sugars profiles from 'Serra da Lousã' heather and 'Terra Quente de Trás-os-Montes' lavender honeys were compared and allowed the discrimination: 'Serra da Lousã' honeys do not contain sucrose, generally exhibit lower contents of turanose, trehalose and maltose and higher contents of fructose and glucose. Different localities from 'Serra da Lousã' provided groups of samples with high and low glycerol contents. Glycerol and ethanol contents were revealed to be independent of the sugars profiles. These data and statistical models can be very useful in the comparison and detection of adulterations during the quality control analysis of 'Serra da Lousã' honey.

  3. The Brazilian Malaria Vector Anopheles (Kerteszia) Cruzii: Life Stages and Biology (Diptera: Culicidae)

    DTIC Science & Technology

    1991-11-01

    Mosquitos no litoral paranaense. I - Idade fisioldgica de no Parque National da Serra dos Orgaos, Anopheles cruzii (Diptera, Culicidae). Arq. Estado do...no Parque National da Peryassii, A.G. 1908. OS culicideos do Brazil. Serra dos Grgaos, Estado do Rio de Janeiro, Inst. de Manguinhos, Rio de Janeiro...Kerteszia no litoral Guimar%es, A.E. and V.N.M. Victoria. 1986. do estado de Santa Catarina. Rev. Bras. Mosquitos no Parque National da Serra dos

  4. The influence of the area of the Serra da Mesa Hydroelectric Plant, State of Goiás, on the frequency and diversity of anophelines (Diptera: Culicidae): a study on the effect of a reservoir.

    PubMed

    Melandri, Vanessa; Alencar, Jerônimo; Guimarães, Anthony Érico

    2015-01-01

    Bioecological aspects of anophelines (Diptera: Culicidae) near areas under the direct influence of the hydroelectric plant reservoir of Serra da Mesa in Goiás, Brazil, were analyzed. Samples were collected at the surrounding dam area during the phases before and after reservoir impoundment. The influence of climatic and environmental factors on the occurrence of Anopheles darlingi, Anopheles albitarsis, Anopheles triannulatus, Anopheles oswaldoi and Anopheles evansae was assessed using Pearson's correlations with indicators for richness and diversity as well as the index of species abundance (ISA) and the standardized index of species abundance (SISA). The highest anopheline density occurred during the phase after filling the tank; however, no direct correlation with the climatic factors was observed during this stage. The reservoir formation determined the incidence of the anopheline species. An. darlingi was the predominant species (SISA = 1.00). The significant difference (p < 0.05) observed between the species incidence during the different reservoir phases demonstrates the environmental effect of the reservoir on anophelines.

  5. Relief evolution of the Continental Rift of Southeast Brazil revealed by in situ-produced 10Be concentrations in river-borne sediments

    NASA Astrophysics Data System (ADS)

    Salgado, André Augusto Rodrigues; Rezende, Eric de Andrade; Bourlès, Didier; Braucher, Régis; da Silva, Juliana Rodrigues; Garcia, Ricardo Alexandrino

    2016-04-01

    This study aims to quantify the denudation dynamics of the Brazilian passive margin along a segment of the Continental Rift of Southeast Brazil. The denudation rates of 30 basins that drain both horsts of the continental rift, including the mountain ranges of the Serra do Mar (seaside horst); and the Serra da Mantiqueira (continental horst); were derived from 10Be concentrations measured in sand-sized river sediment. The mean denudation rate ranges from 9.2 m Ma-1 on the plateau of the Serra do Mar to 37.1 m Ma-1 along the oceanic escarpment of the Serra do Mar. The seaward-facing scarps of both mountain ranges exhibit mean denudation rates that are approximately 1.5 times those of the inland-facing scarps. The escarpments of the horst nearer to the ocean (Serra do Mar) exhibit higher denudation rates (mean 30.2 m Ma-1) than the escarpments of the continental horst (Serra da Mantiqueira) (mean 16.5 m Ma-1). The parameters that impact these denudation rates include the catchment relief, the slope gradient, the rock and the climate. The incongruent combination of a mountainous landscape and moderate to low 10Be-based denudation rates averaging at ∼20 m Ma-1 suggests a reduction in intraplate tectonic activity beginning in the Middle Quaternary or earlier.

  6. Entry Inhibition of Influenza Viruses with High Mannose Binding Lectin ESA-2 from the Red Alga Eucheuma serra through the Recognition of Viral Hemagglutinin

    PubMed Central

    Sato, Yuichiro; Morimoto, Kinjiro; Kubo, Takanori; Sakaguchi, Takemasa; Nishizono, Akira; Hirayama, Makoto; Hori, Kanji

    2015-01-01

    Lectin sensitivity of the recent pandemic influenza A virus (H1N1-2009) was screened for 12 lectins with various carbohydrate specificity by a neutral red dye uptake assay with MDCK cells. Among them, a high mannose (HM)-binding anti-HIV lectin, ESA-2 from the red alga Eucheuma serra, showed the highest inhibition against infection with an EC50 of 12.4 nM. Moreover, ESA-2 exhibited a wide range of antiviral spectrum against various influenza strains with EC50s of pico molar to low nanomolar levels. Besides ESA-2, HM-binding plant lectin ConA, fucose-binding lectins such as fungal AOL from Aspergillus oryzae and AAL from Aleuria aurantia were active against H1N1-2009, but the potency of inhibition was of less magnitude compared with ESA-2. Direct interaction between ESA-2 and a viral envelope glycoprotein, hemagglutinin (HA), was demonstrated by ELISA assay. This interaction was effectively suppressed by glycoproteins bearing HM-glycans, indicating that ESA-2 binds to the HA of influenza virus through HM-glycans. Upon treatment with ESA-2, no viral antigens were detected in the host cells, indicating that ESA-2 inhibited the initial steps of virus entry into the cells. ESA-2 would thus be useful as a novel microbicide to prevent penetration of viruses such as HIV and influenza viruses to the host cells. PMID:26035023

  7. Gamma-ray spectrometry of granitic suites of the Paranaguá Terrane, Southern Brazil

    NASA Astrophysics Data System (ADS)

    Weihermann, Jessica Derkacz; Ferreira, Francisco José Fonseca; Cury, Leonardo Fadel; da Silveira, Claudinei Taborda

    2016-09-01

    The Paranaguá Terrane, located in the coastal portion of the states of Santa Catarina, Paraná and São Paulo in Southern Brazil is a crustal segment constituted mainly by an igneous complex, with a variety of granitic rocks inserted into the Serra do Mar ridge. The average altitude is approximately 1200 m above sea level, with peaks of up to 1800 m. Due to the difficulty of accessing the area, a shortage of outcrops and the thick weathering mantle, this terrane is understudied. This research aims to evaluate the gamma-ray spectrometry data of the granitic suites of the Paranaguá Terrane, in correspondence with the geological, petrographical, lithogeochemical, relief and mass movement information available in the literature. Aerogeophysical data were acquired along north-south lines spaced at 500 m, with a mean terrain clearance of 100 m. These data cover potassium (K, %), equivalent in thorium (eTh, ppm) and equivalent in uranium (eU, ppm). After performing a critical analysis of the data, basic (K, eU, eTh) and ternary (R-K/G-eTh/B-eU) maps were generated and then superimposed on the digital elevation model (DEM). The investigation of the radionuclide mobility across the relief and weathering mantle consisted of an analysis of the schematic profiles of elevation related with each radionuclide; a comparison of the K, eU and eTh maps with their 3D correspondents; and the study of mass movements registered in the region. A statistical comparison of lithogeochemical (K, U, Th) and geophysical (K, eU, eTh) data showed consistency in all the granitic suites studied (Morro Inglês, Rio do Poço and Canavieiras-Estrela). Through gamma-ray spectrometry, it was possible to establish relationships between scars (from mass movements) and the gamma-ray responses as well as the radionuclide mobility and the relief and to map the granitic bodies.

  8. Magnetic anomalies in the Cosmonauts Sea, off East Antarctica

    NASA Astrophysics Data System (ADS)

    Nogi, Y.; Hanyu, T.; Fujii, M.

    2017-12-01

    Identification of magnetic anomaly lineations and fracture zone trends in the Southern Indian Ocean, are vital to understanding the breakup of Gondwana. However, the magnetic spreading anomalies and fracture zones are not clear in the Southern Indian Ocean. Magnetic anomaly lineations in the Cosmonauts Sea, off East Antarctica, are key to elucidation of separation between Sri Lanka/India and Antarctica. No obvious magnetic anomaly lineations are observed from a Japanese/German aerogeophysical survey in the Cosmonauts Sea, and this area is considered to be created by seafloor spreading during the Cretaceous Normal Superchron. Vector magnetic anomaly measurements have been conducted on board the Icebreaker Shirase mainly to understand the process of Gondwana fragmentation in the Indian Ocean. Magnetic boundary strikes are derived from vector magnetic anomalies obtained in the Cosmonauts Sea. NE-SW trending magnetic boundary strikes are mainly observed along the several NW-SE oriented observation lines with magnetic anomaly amplitudes of about 200 nT. These NE-SW trending magnetic boundary strikes possibly indicate M-series magnetic anomalies that can not be detected from the aerogeophysical survey with nearly N-S observation lines. We will discuss the magnetic spreading anomalies and breakup process between Sri Lanka/India and Antarctica in the Cosmonauts Sea.

  9. Lithostratigraphy and volcanology of the Serra Geral Group, Paraná-Etendeka Igneous Province in Southern Brazil: Towards a formal stratigraphical framework

    NASA Astrophysics Data System (ADS)

    Rossetti, Lucas; Lima, Evandro F.; Waichel, Breno L.; Hole, Malcolm J.; Simões, Matheus S.; Scherer, Claiton M. S.

    2018-04-01

    The volcanic rocks of the Lower Cretaceous Paraná-Etendeka Igneous Province, in Brazil, are grouped in the Serra Geral Group. The province can be chemically divided into low-TiO2, and high-TiO2. In southern Brazil, the low-TiO2 lava pile reaches a thickness of 1 km and is formed of heterogeneous lava packages here divided into four lava formations. Torres Formation (TF) is characterized by chemically more primitive basaltic (> 5 wt% MgO) compound pahoehoe flow fields; these lavas stratigraphically overly aeolian sandstones of Botucatu Formation and represent the onset of the volcanic activity. Vale do Sol Formation (VSF) groups vertically stacked sheet-like rubbly pahoehoe basaltic andesites (SiO2 > 51 wt%; MgO < 5 wt%). These lavas covered the former basalts in the Torres Syncline axis and pinch out towards southwest and represent the most voluminous mafic lava flows. Dacites and rhyolites of Palmas Formation (PF) overlay VSF flows in the central and eastern outcrop area and rest directly upon TF lavas in the west. The acidic units were emplaced as lava domes and widespread tabular lava flows. Esmeralda Formation (EF) is the upper stratigraphic unit and it is formed by a basaltic pahoehoe flow field emplaced during the waning phase of volcanic activity of the low-TiO2 lava sequence. Sedimentary interbeds are preserved throughout the whole lava pile and were deposited during quiescence periods of volcanic activity, and represent important stratigraphic markers (e.g. TF-VSF contact). The newly proposed stratigraphy provides promptly recognized stratigraphic units in a regional framework of fundamental importance for future correlations and provide vital information in the understanding of how the Paraná-Etendeka Igneous Province evolved through time.

  10. Impact of natural climate change and historical land use on vegetation cover and geomorphological process dynamics in the Serra dos Órgãos mountain range in Rio de Janeiro State, Brazil

    NASA Astrophysics Data System (ADS)

    Nehren, U.; Sattler, D.; Heinrich, J.

    2010-03-01

    The Serra dos Órgãos mountain range in the hinterland of Rio de Janeiro contains extensive remnants of the Atlantic Forest (Mata Atlântica) biome, which once covered about 1.5 million km² from Northeast to South Brazil and further inland to Paraguay and Argentina. As a result of historical deforestation and recent land use intensification processes today only 5 to 8% of the original Atlantic Forest remains. Despite the dramatic habitat loss and a high degree of forest fragmentation, the remnants are among the Earth’s most diverse habitats in terms of species richness. Furthermore, they are characterized by a high level of endemism. Therefore, the biome is considered a "hotspot of biodiversity". In the last years many efforts have been taken to investigate the Mata Atlântica biome in different spatial and time scales and from different scientific perspectives. We are working in the Atlantic Forest of Rio de Janeiro since 2004 and focus in our research particularly on Quaternary landscape evolution and landscape history. By means of landscape and soil archives we reconstruct changes in the landscape system, which are mainly the result of Quaternary climate variability, young tectonic uplift and human impact. The findings throw light on paleoecological conditions in the Late Quaternary and the impact of pre-colonial and colonial land use practices on these landscapes. In this context, a main focus is set on climate and human-driven changes of the vegetation cover and its consequences for the geomorphological process dynamics, in particular erosion and sedimentation processes. Research methods include geomorphological field studies, interpretation of satellite images, physical and chemical sediment and soil analyses as well as relative and absolute dating (Feo/Fed ratio and 14C dating). For the Late Quaternary landscape evolution, the findings are compared with results from paleoclimatic and paloecological investigations in Southeast and South Brazil using other

  11. Accordant summit heights, summit levels and the origin of the ``upper denudation level'' in the Serra do Mar (SE-Brazil, São Paulo): A study of hillslope forms and processes

    NASA Astrophysics Data System (ADS)

    Römer, Wolfgang

    2008-08-01

    In southern São Paulo the Serra do Mar is characterized by three distinct terrain types: 1) highly dissected areas with closely spaced ridges and accordant summit heights; 2) multiconvex hills; and 3) terrains with highly elevated watershed areas, irregular summit heights, and locally subdued relief. The development of this landscape is considered to be the result of the Cenozoic block-faulting and of the influences that are exerted by the differing lithological and structural setting of block-faulted compartments on weathering and erosion processes. In areas characterized by pronounced accordant summits the close coincidence between hillslope angle and the angle of limiting stability against landsliding points to a close adjustment of hillslope gradients and the mechanical properties of the regolith. The relative height of the hillslopes is functionally related to the spacing of the valleys and the gradient of the hillslopes. In areas with a regular spacing of v-shaped valleys and uniform rocks, this leads to the intersection of valley-side slopes in summits and ridges at a certain elevation. This elevation is determined by the length and steepness of the valley-side slopes. Therefore, the heights of the summits are geometrically constrained and are likely to indicate the upper limit of summit heights or an "upper denudation level" that is adjusted by hillslope processes to the incising streams. Accordant summit heights of this type are poor indicators of formerly more extensive denudation surfaces as it is also likely that they are a result of the long-term adjustment of hillslopes to river incision. The steep mountain flanks of block-faulted compartments on the other hand, comprise regolith-covered hillslopes that are closely adjusted to the maximum stable gradient as well as rock-slopes that are controlled by the rock-mass strength. Their summits are usually not accommodated into uniform summit levels. Highly elevated watershed areas exhibiting a subdued

  12. The Orosirian-Statherian banded iron formation-bearing sequences of the southern border of the Espinhaço Range, Southeast Brazil

    NASA Astrophysics Data System (ADS)

    Rolim, Vassily Khoury; Rosière, Carlos A.; Santos, João Orestes Schneider; McNaughton, Neal J.

    2016-01-01

    The Serra da Serpentina and the Serra de São José groups are two distinct banded iron formation-bearing metasedimentary sequences along the eastern border of the southern Espinhaço Range that were deposited on the boundary between the Orosirian and Statherian periods. The Serra da Serpentina Group (SSG) has an Orosirian maximum depositional age (youngest detrital zircon grain age = 1990 ± 16 Ma) and consists of fine clastic metasediments at the base and chemical sediments, including banded iron formations (BIFs), on the top, corresponding to the Meloso and Serra do Sapo formations, respectively, and correlating with the pre-Espinhaço Costa Sena Group. The SSG represents sedimentary deposition on an epicontinental-epeiric, slow downwarping sag basin with little tectonic activity. The younger Serra de São José Group (SJG) is separated from the older SSG by an erosional unconformity and was deposited in a tectonically active continental rift-basin in the early stages of the opening of the Espinhaço Trough. The Serra do São José sediments stretch along the north-south axis of the rift and comprise a complete cycle of transgressive sedimentary deposits, which were subdivided, from base to top, into the Lapão, Itapanhoacanga, Jacém and Canjica formations. The Itapanhoacanga Formation has a maximum depositional age of 1666 ± 32 Ma (Statherian), which coincides with the maximum depositional age (i.e., 1683 ± 11 Ma) of the São João da Chapada Formation, one of the Espinhaço Supergroup's basal units. The Serra de São José Rift and the Espinhaço Rift likely represent the same system, with basal units that are facies variations of the same sequence. The supracrustal rocks have undergone two stages of deformation during the west-verging Brasiliano orogeny that affected the eastern margin of the São Francisco Craton and generated a regional-scale, foreland N-S trending fold-thrust belt, which partially involved the crystalline basement. Thrust faults have

  13. Ross Ice Shelf, Antarctica: Bathymetry, Structural Geology and Ocean Circulation from New IcePod Airborne Geophysical Data

    NASA Astrophysics Data System (ADS)

    Siddoway, C. S.; Tinto, K. J.; Bell, R. E.; Padman, L.; Fricker, H. A.; Springer, S. R.

    2016-12-01

    Rock exposures in the Ford Ranges, Marie Byrd Land (MBL), on the eastern margin of the Ross Embayment, contain direct evidence of the geological processes that led to formation of West Antarctica's continental lithosphere. Processes include wide regional extension, volcanism, and thermal reequilibration, with creation of crustal structures that are prone to reactivation today. Marie Byrd Land is tectonically active, as is evident from Late Pleistocene to Holocene eruptive centers, englacial volcanic tephra as young as 2200 years, a site of magma propagation inferred from POLEnet seismic records, and the occurrence of a 2012 earthquake cluster of magnitude M4.4 to M5.5 north of Edward VII Peninsula. However, the lithosphere underlying the Ross Ice Shelf (RIS) is poorly known due to the thick cover of shelf ice floating on the ocean, difficult to penetrate by satellite remote sensing or other methods. Airborne geophysical data for the Ford Ranges and the Ross Ice Shelf (RIS) suggest that the rock formations and structures that underlie MBL continue beneath the RIS. Notable features known in outcrop and detected/inferred from potential fields data are Pleistocene or younger mafic volcanic centers and Cretaceous core complexes, both likely associated with wrench faults. The Ford Ranges legacy dataset that now provides a fundamental basis for sub-RIS geological interpretation is a product of research in coastal MBL led by B.P. Luyendyk from 1989 - 2006. To improve our knowledge of lithospheric evolution, identify active faults and prospective zones of volcanism/heat flow, and to determine the sub-RIS bathymetry, the RIS sector is being explored via new Icepod aerogeophysics acquisition during the ROSETTA-Ice project (Ross Ocean and ice Shelf Environment, and Tectonic setting Through Aerogeophysical surveys and modeling), now underway over this vast under-explored sector of the Ross Embayment. ROSETTA-Ice collects and employs new gravity data with magnetics to delineate

  14. Hematology and blood chemistry parameters differ in free-ranging maned wolves (Chrysocyon brachyurus) living in the Serra da Canastra National Park versus adjacent farmlands, Brazil.

    PubMed

    May-Júnior, J A; Songsasen, N; Azevedo, F C; Santos, J P; Paula, R C; Rodrigues, F H G; Rodden, M D; Wildt, D E; Morato, R G

    2009-01-01

    There has been growing interest in the specific impacts of anthropogenic factors on the health of wildlife. This study examined hematology and serum chemistry status of a prominent carnivore, the maned wolf (Chrysocyon brachyurus), living in, on the boundaries to, or on adjacent farmlands to the Serra da Canastra National Park, Brazil. Twenty-eighty wolves were captured, and values were compared 1) between subadults (n=8 animals) and adults (n=20 animals), 2) males (n=12 animals) and females (n=16 animals), and 3) among wolves living inside the park (n=11), near the park border (n=11 animals), and in neighboring farming areas (n=6 animals). Age, gender, and wolf locations influenced (P<0.05) hematology and serum biochemistry values. Specifically, adults had lower (P<0.05) circulating phosphorus than subadults. Males had lower (P<0.05) serum glucose, creatinine phosphokinase, and cholesterol and higher (P<0.05) potassium than females. Erythrocyte count and serum cholinesterase were lower (P<0.05) in wolves living within the park compared with near the park border or on farmlands. Mean corpuscular volume was lower (P<0.05) in wolves living near the park border than those ranging within the park and on farmlands. Aspartate transaminase and chloride were higher (P<0.05) in wolves living inside the park compared with those ranging near the park border. Creatinine phosphokinase was lower (P<0.05) in wolves living on farmland compared with the other two locations. These results clearly reveal a relationship between age and gender on hematology and serum biochemistry values in free-living maned wolves. More importantly, certain traits indicative of health are potentially compromised in wolves living in areas under anthropogenic pressure. These data lay a foundation for examining the influence of farming and local domestic species on disease susceptibility and fitness in the maned wolf.

  15. Elevation as a barrier: genetic structure for an Atlantic rain forest tree (Bathysa australis) in the Serra do Mar mountain range, SE Brazil.

    PubMed

    Reis, Talita Soares; Ciampi-Guillardi, Maísa; Bajay, Miklos Maximiliano; de Souza, Anete Pereira; Dos Santos, Flavio Antonio Maës

    2015-05-01

    Distance and discrete geographic barriers play a role in isolating populations, as seed and pollen dispersal become limited. Nearby populations without any geographic barrier between them may also suffer from ecological isolation driven by habitat heterogeneity, which may promote divergence by local adaptation and drift. Likewise, elevation gradients may influence the genetic structure and diversity of populations, particularly those marginally distributed. Bathysa australis (Rubiaceae) is a widespread tree along the elevation gradient of the Serra do Mar, SE Brazil. This self-compatible species is pollinated by bees and wasps and has autochoric seeds, suggesting restricted gene dispersal. We investigated the distribution of genetic diversity in six B. australis populations at two extreme sites along an elevation gradient: a lowland site (80-216 m) and an upland site (1010-1100 m.a.s.l.). Nine microsatellite loci were used to test for genetic structure and to verify differences in genetic diversity between sites. We found a marked genetic structure on a scale as small as 6 km (F ST = 0.21), and two distinct clusters were identified, each corresponding to a site. Although B. australis is continuously distributed along the elevation gradient, we have not observed a gene flow between the extreme populations. This might be related to B. australis biological features and creates a potential scenario for adaptation to the different conditions imposed by the elevation gradient. We failed to find an isolation-by-distance pattern; although on the fine scale, all populations showed spatial autocorrelation until ∼10-20 m. Elevation difference was a relevant factor though, but we need further sampling effort to check its correlation with genetic distance. The lowland populations had a higher allelic richness and showed higher rare allele counts than the upland ones. The upland site may be more selective, eliminating rare alleles, as we did not find any evidence for

  16. Mobile geophysics for searching and exploration of Domanic hydrocarbon deposits

    NASA Astrophysics Data System (ADS)

    Borovsky, M. Ya; Uspensky, B. V.; Valeeva, S. E.; Borisov, A. S.

    2018-05-01

    There are noted features of shale hydrocarbons occurrence. It is shown the role of geophysical prospecting in the geological prospecting process for non-traditional sources of hydrocarbon. There are considered the possibilities of non-seismic methods for forecasting, prospecting, exploration and preparation of Domanikovian hydrocarbons accumulations for exploration. It is emphasized the need for geophysical studies of tectonic disturbances. Modern aerogeophysical instrumentation and methodological support allows to combine high-precision magneto-prospecting with gravimetric and gamma spectrometry. This combination of geophysical methods contributes to the diagnosis of active and latent faults.

  17. A sensitive analysis method for 7 diterpenoids in rat plasma by liquid chromatography-electrospray ionization mass spectrometry and its application to pharmacokinetic study of Isodon serra extract.

    PubMed

    Du, Yingfeng; Liu, Pengwei; Zhu, Hong; Shi, Xiaowei; Zhao, Chengcheng; Wang, Na; Zhang, Lantong

    2011-10-28

    A simple and sensitive LC-MS/MS method has been developed and validated for the identification and quantification of epinodosin, epinodosinol, nodosin, oridonin, lasiokariurinol, lasiokaurin and rabdoternin A in rat plasma using sulfamethoxazole as the internal standard. The plasma sample pre-treatment consisted of a liquid-liquid extraction. Chromatographic separation was achieved on a C18 column with linear gradient elution using water and methanol, which were both acidified with 0.1% formic acid, at a flow rate of 0.7 mL/min. A tandem mass spectrometric detection was conducted using multiple reaction monitoring (MRM) via an electrospray ionization (ESI) source. A novel multi-determination-periods program was executed to achieve a higher sensitivity by setting five scanning periods. The method presented here utilizes a novel determination strategy, enabling the application of positive and negative ESI-MS in a single run. The optimized mass transition ion-pairs (m/z) for quantitation were 361.2/287.1 for epinodosin, 382.3/347.3 for epinodosinol, 363.3/281.2 for nodosin, 365.3/347.3 for oridonin, 407.3/329.1 for lasiokariurinol, 405.2/59.0 for lasiokaurin, 363.2/283.1 for rabdoternin A and 254.1/156.0 for IS. The total run time was 20.50 min (including 5 min equilibration time) between injections. The specificity, linearity, accuracy, precision, recovery, matrix effect and several validation results demonstrate that this method is sensitive, specific and reliable. The proposed method was further applied to investigate the pharmacokinetics of all analytes after a single oral administration of Isodon serra extract to rats. Copyright © 2011 Elsevier B.V. All rights reserved.

  18. Stratigraphy of fluvial sediment sequences and their palaeoenvironmental information in the foreland of the Serra dos Órgãos, southeastern Brazil

    NASA Astrophysics Data System (ADS)

    Kirchner, André; Nehren, Udo; Heinrich, Jürgen

    2013-04-01

    In the hinterland of Rio de Janeiro city the rivers Guapiaçu, Macacu and Iconha originate in the Serra dos Órgãos mountain range and drain into the Atlantic Ocean. Since their channelization in the 1950s, higher flow velocities caused an incision of the rivers into the valley fills. These circumstances provide the possibility to study the alluvial deposits along the streams during low water level and allow conclusions on palaeoenvironmental change and landscape history. Sedimentological investigations of 13 exposures as well as AMS 14C measurements were carried out to investigate sediment properties and reconstruct the sedimentation history within the floodplains. These results enable to distinguish three different facies units. A late Pleistocene Unit I can be detected at the base of the observed exposures and consists of clast-supported fine to coarse gravels. It can be assumed that the gravel bodies were formed by a climatically induced erosional-depositional cycle within a braided river system. The gravels are overlaid by Unit II, a grayish to bluish loam mainly of mid-Holocene age. During generally drier climates these loams have been deposited during high water stages or flooding events as a splay facies proximal to the rivers. A reduced flow competence and relatively stable morphodynamic conditions are assumed for that period. Unit III accumulated in the late Holocene typically consists of several meters of planar or cross bedded sands to fine gravels, interfingered by loamy inclusions, buried peat bogs and organic debris. Fining-upward sequences can be frequently studied within Unit III which were completed by loamy sediments in the uppermost parts of the exposures. The increased flow competence from Unit II to Unit III seems to be a fluvial response to the increased humidity of the late Holocene as well as the enhancement of El Niño-Southern Oscillation (ENSO). Heavy rainfall likely caused higher sediment supply from the steep slopes as well as a

  19. A new brachypterous genus of Brazilian stag beetle (Coleoptera: Lucanidae: Lucaninae) with description of three new species.

    PubMed

    Grossi, Paschoal Coelho

    2016-02-09

    Montesinus gen. nov. is described from Brazil, along with three new species, Montesinus monnei sp. nov. (Holotype male deposited in MNRJ: Brazil, Espírito Santo State, Parque Nacional do Caparaó, 2500 m a.s.l., 13.IV.2001, F.O. Correia leg.), M. tatula sp. nov. (Holotype female deposited in CERPE: Brazil, Minas Gerais State, Corinto, 900 m a.s.l., I.1998, E. Antunes leg.), and M. machadoi sp. nov. (Holotype female deposited in MNRJ: Brazil, Espírito Santo State, Serra do Caparaó, Ibitirama, 2600 m a.s.l., 10-12.IV.2012, M.V.P. Simões leg.). This unusual genus is related to Altitatiayus Weinreich, with which it shares the brachypterous condition and also some characters of the male genitalia, being distinguished from it mainly by its punctate flat head and indistinct elytral striae. The three new species are distinguished by their general color, shape of posterior margin of pronotum, tibial armature and elytral punctures. The new species are from two isolated mountain formations, called Serra do Caparaó and Serra do Espinhaço formations. This is the third brachypterous genus of stag beetle found in Brazil, but it occurs in mountains isolated from the Serra da Mantiqueira where the other two genera are found. The habitus, male genitalia and maxillae of the new species are illustrated.

  20. Airborne Surveys Conducted by SOAR for Geologic Studies in Antarctica, 1998-2001

    NASA Astrophysics Data System (ADS)

    Holt, J. W.

    2001-05-01

    During the three austral summers that occurred in the period October, 1998 to February, 2001, the Support Office for Aerogeophysical Research (SOAR) of the University of Texas Institute for Geophysics (UTIG) conducted aerogeophysical campaigns for eight separate projects in both East and West Antarctica. Measurements were made of magnetic and gravitational fields, surface elevation and sub-glacial bed elevation. Surveys were accomplished with a modified deHavilland Twin Otter aircraft equipped with a towed magnetometer, gyro-stabilized gravity meter, laser altimeter, ice-penetrating radar, and carrier-phase GPS receivers. Diurnal variations of the geomagnetic field were measured at nearby base stations where static GPS data were collected for differential aircraft positioning. Four of the experiments performed were designed to address fundamental geologic questions when combined with ground-based studies and/or geophysical modeling in studies by multiple investigators at several institutions. In western Marie Byrd Land (MBL), a 330 x 440 km survey (line spacing ranged from 5.3 x 5.3 km to 10.6 x 10.6 km) was flown in order to understand the tectonic and geologic devolpment of the boundary between the Ross Sea Rift and the MBL volcanic province. A series of corridors were flown across the Transantarctic Mountains (TAM) in order to study extreme and variable rift flank uplift. These consist of a 100 x 810 km corridor extending from Ice Stream B across the Watson Escarpment and into central East Antarctica beyond South Pole, a 100 x 1170 km corridor from Ross Island to Dome C, and a single line across the TAM near Robb Glacier (line spacing for corridors was 10 km with 30 km tie-lines). Three parallel lines, 1300 km long and separated by 5 km, were flown from near Taylor Dome to AGO4, complementing a passive seismic array planned in order to investigate the crust and upper mantle structure beneath the East-West Antarctic boundary. Another survey was performed in order

  1. Software use cases to elicit the software requirements analysis within the ASTRI project

    NASA Astrophysics Data System (ADS)

    Conforti, Vito; Antolini, Elisa; Bonnoli, Giacomo; Bruno, Pietro; Bulgarelli, Andrea; Capalbi, Milvia; Fioretti, Valentina; Fugazza, Dino; Gardiol, Daniele; Grillo, Alessandro; Leto, Giuseppe; Lombardi, Saverio; Lucarelli, Fabrizio; Maccarone, Maria Concetta; Malaguti, Giuseppe; Pareschi, Giovanni; Russo, Federico; Sangiorgi, Pierluca; Schwarz, Joseph; Scuderi, Salvatore; Tanci, Claudio; Tosti, Gino; Trifoglio, Massimo; Vercellone, Stefano; Zanmar Sanchez, Ricardo

    2016-07-01

    The Italian National Institute for Astrophysics (INAF) is leading the Astrofisica con Specchi a Tecnologia Replicante Italiana (ASTRI) project whose main purpose is the realization of small size telescopes (SST) for the Cherenkov Telescope Array (CTA). The first goal of the ASTRI project has been the development and operation of an innovative end-to-end telescope prototype using a dual-mirror optical configuration (SST-2M) equipped with a camera based on silicon photo-multipliers and very fast read-out electronics. The ASTRI SST-2M prototype has been installed in Italy at the INAF "M.G. Fracastoro" Astronomical Station located at Serra La Nave, on Mount Etna, Sicily. This prototype will be used to test several mechanical, optical, control hardware and software solutions which will be used in the ASTRI mini-array, comprising nine telescopes proposed to be placed at the CTA southern site. The ASTRI mini-array is a collaborative and international effort led by INAF and carried out by Italy, Brazil and South-Africa. We present here the use cases, through UML (Unified Modeling Language) diagrams and text details, that describe the functional requirements of the software that will manage the ASTRI SST-2M prototype, and the lessons learned thanks to these activities. We intend to adopt the same approach for the Mini Array Software System that will manage the ASTRI miniarray operations. Use cases are of importance for the whole software life cycle; in particular they provide valuable support to the validation and verification activities. Following the iterative development approach, which breaks down the software development into smaller chunks, we have analysed the requirements, developed, and then tested the code in repeated cycles. The use case technique allowed us to formalize the problem through user stories that describe how the user procedurally interacts with the software system. Through the use cases we improved the communication among team members, fostered

  2. Spatial and seasonal characteristics of cold-air pools in the upper Zêzere valley (Serra da Estrela, Portugal)

    NASA Astrophysics Data System (ADS)

    Mora, Carla

    2010-05-01

    Occurrence, formation, spatial patterns and intensity of cold air pools/lakes were studied in the Serra da Estrela (40° 20'N 7° 35'W, 1993m, Central Portugal) from January to December 2000. Data was collected using a network of air temperature dataloggers installed at different topographic positions (interfluves, valley floors and slopes) recording at 2-h intervals. A k-means classification was applied to the dataset of instantaneous air temperatures, and 3 types of thermal patterns were identified. Type 1 (66% cases) shows events with decreasing air temperatures with altitude. Type 2 (27% cases) shows accumulation of cold air in the valleys with higher valley floors showing the lowest temperatures. Type 3 (7% cases) show accumulation of cold air, but with lowest air temperatures in the valleys at lower altitudes. Causal factors for the occurrence of the patterns were studied by applying discriminant analysis on meteorological and topographical variables. Type 1 occurs under atmospheric instability conditions, while types 2 and 3 relate to atmospheric stability. Types 2 and 3 are controlled by seasonality and local insolation/shadowing effects. For the detailed study of cold air accumulations, two approaches were followed: the analysis of temperature differences between a station in a crest and a station in a glacial cirque floor; and, the analysis of 5-min interval temperature data along a transect in the Zêzere valley.The differences in air temperature between the glacier cirque floor (Covão Cimeiro, 1620m) and the crest (Cântaro Gordo, 1870m) were classified into 9 types of regime. Thermal inversions in the cirque were found in 6 types (48%). These are characterized in detail and the geographical and meteorological controlling factors are analyzed using one-way ANOVA and discriminant analysis. The 6 types show different daily regimes and inversion intensities, as well as a seasonal trend. The maximum inversion intensity was 9 °C, and the minimum

  3. Paleoenvironmental Evolution of Continental Carbonates in West-Central Brazil.

    PubMed

    Oliveira, Emiliano C; Rossetti, Dilce F; Utida, Giselle

    2017-05-01

    This paper presents a sedimentological and stratigraphical study of Quaternary (Middle to Late Pleistocene/Holocene) continental carbonates outcrops inside Pantanal Basin and its surroundings, especially in Serra da Bodoquena, Pantanal do Miranda and Corumbá/Ladário plateau, in the state of Mato Grosso do Sul, as well as in Serra das Araras, in the state of Mato Grosso. The aim is to understand the depositional paleoenvironments and analyse climate and tectonic influences in their genesis and evolution. The results show that the deposition of these continental carbonates started in the Middle to Late Pleistocene and have continued, with some interruptions, until the present days. Sedimentary successions were identified in the different areas, without complete correlation. Two sedimentary successions separated by an erosional surface were described in Serra da Bodoquena and Serra das Araras. In Corumbá and Pantanal do Miranda, only one succession was described. These successions were deposited in elongated lakes parallel to fault planes; small lakes, related plains and plateaus; springs related to cliffs produced by faulting; rivers conditioned by topographic variation. The climatic interpretation, without proper temporal resolution, obtained by the stable-isotope composition and stratigraphic interpretation, indicates alternation of dry and wet periods. The Neoproterozoic faults with their neotectonics and the subsidence of the Pantanal Basin, are the major control for carbonated water flow and development of depositional areas, gradually turning plateaus into slight tilted areas, allowing the evolution of depositional systems from lakes to rivers.

  4. One project`s waste is another project`s resource

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on thismore » plan. Summaries of examples are presented in tables.« less

  5. Headwater Capture Evidenced by Paleo-Rivers Reconstruction and Population Genetic Structure of the Armored Catfish (Pareiorhaphis garbei) in the Serra do Mar Mountains of Southeastern Brazil

    PubMed Central

    Lima, Sergio M. Q.; Berbel-Filho, Waldir M.; Araújo, Thais F. P.; Lazzarotto, Henrique; Tatarenkov, Andrey; Avise, John C.

    2017-01-01

    this drainage, impacts such as the invasive species and habitat loss can be especially threatening for such species with a narrow range. Our results also suggest that freshwater fishes from headwaters in the Serra do Mar mountains might have different biogeographical patterns than those from the lowlands, indicating a complex and dynamic climatic and geomorphological history. PMID:29259623

  6. Headwater Capture Evidenced by Paleo-Rivers Reconstruction and Population Genetic Structure of the Armored Catfish (Pareiorhaphis garbei) in the Serra do Mar Mountains of Southeastern Brazil.

    PubMed

    Lima, Sergio M Q; Berbel-Filho, Waldir M; Araújo, Thais F P; Lazzarotto, Henrique; Tatarenkov, Andrey; Avise, John C

    2017-01-01

    this drainage, impacts such as the invasive species and habitat loss can be especially threatening for such species with a narrow range. Our results also suggest that freshwater fishes from headwaters in the Serra do Mar mountains might have different biogeographical patterns than those from the lowlands, indicating a complex and dynamic climatic and geomorphological history.

  7. Project management of life-science research projects: project characteristics, challenges and training needs.

    PubMed

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  8. Geological control of flow in the Institute and Möller Ice Streams, West Antarctica

    NASA Astrophysics Data System (ADS)

    Jordan, T. A.; Ferraccioli, F.; Ross, N.; Corr, H.; Bingham, R. G.; Rippin, D. M.; Le Brocq, A.; Siegert, M. J.

    2012-12-01

    The conditions at the base of an ice sheet influence its flow, and reflect the ongoing interaction between moving ice and the underlying geology. Critical influences on ice flow include subglacial topography, bed lithology, and geothermal heat flux. These factors are influenced either directly by local geology, or by the regional tectonic setting. Geophysical methods have been used in many parts of Antarctica, such as the Siple Coast, to reveal the role subglacial geology plays in influencing ice flow. Until recently, however, the Institute and Möller Ice Streams, which drain ~20% of the West Antarctic Ice Sheet into the Weddell Sea, were only covered by sparse airborne radar (~50 km line spacing), and reconnaissance aeromagnetic data, limiting our understanding of the geological template for this sector of the West Antarctic Ice Sheet. Here we present our geological interpretation of the first integrated aerogeophysical survey over the catchments of the Institute and Möller Ice Streams, which collected ~25,000 km of new aerogeophysical data during the 2010/11 field season. These new airborne radar, magnetic and gravity data reveals both the subglacial topography, and the subglacial geology. Our maps show the fastest flowing coastal part of the Institute Ice Stream crosses a sedimentary basin underlain by thinned continental crust. Further inland two distinct ice flow provinces are recognised: the Pagano Ice Flow Province, which follows the newly identified, ~75 km wide, sinistral strike-slip Pagano Fault Zone at the boundary between East and West Antarctica; and the Ellsworth Ice Flow Province, which is controlled by the Permo-Triassic structural grain of folded Middle Cambrian-Permian meta-sediments, and Jurassic granitic rocks which form significant subglacial highlands. Our new data highlight the importance of understanding subglacial geology when explaining the complex pattern of ice flow observed in the ice sheet interior.

  9. Aerogeophysical measurements of collapse-prone hydrothermally altered zones at Mount Rainier volcano.

    PubMed

    Finn, C A; Sisson, T W; Deszcz-Pan, M

    2001-02-01

    Hydrothermally altered rocks can weaken volcanoes, increasing the potential for catastrophic sector collapses that can lead to destructive debris flows. Evaluating the hazards associated with such alteration is difficult because alteration has been mapped on few active volcanoes and the distribution and severity of subsurface alteration is largely unknown on any active volcano. At Mount Rainier volcano (Washington, USA), collapses of hydrothermally altered edifice flanks have generated numerous extensive debris flows and future collapses could threaten areas that are now densely populated. Preliminary geological mapping and remote-sensing data indicated that exposed alteration is contained in a dyke-controlled belt trending east-west that passes through the volcano's summit. But here we present helicopter-borne electromagnetic and magnetic data, combined with detailed geological mapping, to show that appreciable thicknesses of mostly buried hydrothermally altered rock lie mainly in the upper west flank of Mount Rainier. We identify this as the likely source for future large debris flows. But as negligible amounts of highly altered rock lie in the volcano's core, this might impede collapse retrogression and so limit the volumes and inundation areas of future debris flows. Our results demonstrate that high-resolution geophysical and geological observations can yield unprecedented views of the three-dimensional distribution of altered rock.

  10. Aerogeophysical measurements of collapse-prone hydrothermally altered zones at Mount Rainier volcano

    USGS Publications Warehouse

    Finn, C.A.; Sisson, T.W.; Deszcz-Pan, M.

    2001-01-01

    Hydrothermally altered rocks can weaken volcanoes, increasing the potential for catastrophic sector collapses that can lead to destructive debris flows1. Evaluating the hazards associated with such alteration is difficult because alteration has been mapped on few active volcanoes1-4 and the distribution and severity of subsurface alteration is largely unknown on any active volcano. At Mount Rainier volcano (Washington, USA), collapses of hydrothermally altered edifice flanks have generated numerous extensive debris flows5,6 and future collapses could threaten areas that are now densely populated7. Preliminary geological mapping and remote-sensing data indicated that exposed alteration is contained in a dyke-controlled belt trending east-west that passes through the volcano's summit3-5,8. But here we present helicopter-borne electromagnetic and magnetic data, combined with detailed geological mapping, to show that appreciable thicknesses of mostly buried hydrothermally altered rock lie mainly in the upper west flank of Mount Rainier. We identify this as the likely source for future large debris flows. But as negligible amounts of highly altered rock lie in the volcano's core, this might impede collapse retrogression and so limit the volumes and inundation areas of future debris flows. Our results demonstrate that high-resolution geophysical and geological observations can yield unprecedented views of the three-dimensional distribution of altered rock.

  11. Concentrating Solar Power Projects - Power Tower Projects | Concentrating

    Science.gov Websites

    (CSP) projects that use power tower systems are listed below-alphabetically by project name. You can browse a project profile by clicking on the project name. You can also find related information on power Aurora Solar Energy Project Copiapó Crescent Dunes Solar Energy Project (Tonopah) Dahan Power Plant DEWA

  12. Geomorphology Influencing the Diversification of Fish in Small-Order Rivers of Neighboring Basins.

    PubMed

    Morais-Silva, João P; Oliveira, Alessandra V de; Fabrin, Thomaz M C; Diamante, Nathália Alves; Prioli, Sônia M A P; Frota, Augusto; Graça, Weferson J da; Prioli, Alberto J

    2018-03-13

    The current analysis investigates whether the uplift of the Serra da Esperança and the Ponta Grossa Arch in the Serra Geral resulted in ichthyofaunistic changes in adjacent basins. For this, we describe the phylogeographic structure among populations of Trichomycterus collected in hydrographic basins in southern Brazil by using partial nucleotide sequences of the mitochondrial gene Cytochrome C Oxidase subunit I. Analyses revealed that the nomenclature Trichomycterus davisi fails to contain the whole genetic diversity range found in the collected specimens and indicates at least six genetic lineages in Trichomycterus. Diagnostic morphological characteristics not associated to T. davisi could be identified in some specimens from the Iguaçu Piquiri haplogroup, indicating the occurrence of species Trichomycterus stawiarski. The lack of morphological differences among the other clades clearly suggests a cryptic species case. Molecular analyses revealed at least five new species besides T. davisi in the hydrographic basins and support the interpretation that genetic structure in T. davisi species complex is explained by tectonic events intrinsic to the areas of influence of Serra da Esperança and the Ponta Grossa Arch which occurred around 1.7 My.

  13. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  14. Four new species of Luciuranus fireflies from the Brazilian Atlantic Rainforest (Coleoptera: Lampyridae).

    PubMed

    Silveira, Luiz F L da; Souto, Paula M; Mermudes, J R M

    2018-04-20

    Luciuranus Silveira, Khattar Mermudes, 2016 is a firefly genus whose species bear an intricate, species-specific lock-and-key mechanism of reproductive isolation. Here we propose four new species, Luciuranus magnoculus sp. nov., L. desideratus sp. nov., L. takiyae sp. nov. and L. carioca sp. nov., and provide illustrations of their diagnostic features and an updated key to species. As previously reported for their congenerics, each of the four new species have stereotypical morphology of both male and female terminalia, and are regarded as prima facie endemics of single massifs of the Serra da Mantiqueira and Serra do Mar, in the Brazilian Atlantic Rainforest.

  15. Project Success in Agile Development Software Projects

    ERIC Educational Resources Information Center

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  16. An IS Project Management Course Project

    ERIC Educational Resources Information Center

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  17. Project Panama: An International Service Project

    ERIC Educational Resources Information Center

    Aydlett, Lydia; Randolph, Mickey; Wells, Gayle

    2010-01-01

    Participation in service learning projects is a growing phenomenon at universities and colleges. Research indicates service projects are beneficial for college students and adults. There is little data investigating developmental differences in how younger versus older participants perceive the service learning process. In this project, older…

  18. Concentrating Solar Power Projects - Godawari Solar Project | Concentrating

    Science.gov Websites

    Solar Power | NREL Godawari Solar Project This page provides information on Godawari Solar Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. Status Date: February 13, 2014 Project Overview Project Name: Godawari Solar

  19. Quality Assurance Project Plan for Citizen Science Projects

    EPA Pesticide Factsheets

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  20. Projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random networks.

    PubMed

    Feng, Cun-Fang; Xu, Xin-Jian; Wang, Sheng-Jun; Wang, Ying-Hai

    2008-06-01

    We study projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random networks. We relax some limitations of previous work, where projective-anticipating and projective-lag synchronization can be achieved only on two coupled chaotic systems. In this paper, we realize projective-anticipating and projective-lag synchronization on complex dynamical networks composed of a large number of interconnected components. At the same time, although previous work studied projective synchronization on complex dynamical networks, the dynamics of the nodes are coupled partially linear chaotic systems. In this paper, the dynamics of the nodes of the complex networks are time-delayed chaotic systems without the limitation of the partial linearity. Based on the Lyapunov stability theory, we suggest a generic method to achieve the projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random dynamical networks, and we find both its existence and sufficient stability conditions. The validity of the proposed method is demonstrated and verified by examining specific examples using Ikeda and Mackey-Glass systems on Erdos-Renyi networks.

  1. Project-Based Teaching: Helping Students Make Project Connections

    NASA Astrophysics Data System (ADS)

    Johnson, Heather Jo Pusich

    Project-based curriculum materials are designed to support students in engaging with scientific content and practices in meaningful ways, with the goal of improving students' science learning. However, students need to understand the connections between what they are doing on a day-to-day basis with respect to the goals of the overall project for students to get the motivational and cognitive benefits of a project-based approach. In this dissertation, I looked at the challenges that four ninth grade science teachers faced as they helped students to make these connections using a project-based environmental science curriculum. The analysis revealed that in general when the curriculum materials made connections explicit, teachers were better able to articulate the relationship between the lesson and the project during enactment. However, whether the connections were explicit or implicit in the materials, enactments of the same lesson across teachers revealed that teachers leveraged different aspects of the project context in different ways depending on their knowledge, beliefs, and goals about project-based teaching. The quantitative analysis of student data indicated that when teacher enactments supported project goals explicitly, students made stronger connections between a lesson and the project goal. Therefore, a teacher's ability to make clear connections during classroom instruction is essential. Furthermore, when students made connections between each lesson and the larger project goals their attitudes toward the lesson were more positive and they performed better on the final assessment. These findings suggest that connections between individual lessons and the goals of the project are critical to the effectiveness of project-based learning. This study highlights that while some teachers were able to forge these connections successfully as a result of leveraging cognitive resources, teachers' beliefs, knowledge and goals about project-based teaching are

  2. Concentrating Solar Power Projects - Parabolic Trough Projects |

    Science.gov Websites

    Project Godawari Solar Project Gujarat Solar One Gulang 100MW Thermal Oil Parabolic Trough project Guzmán Kuraymat (ISCC Kuraymat) Kathu Solar Park KaXu Solar One KVK Energy Solar Project La Africana La Dehesa La Power Facility Nevada Solar One (NSO) NOOR I NOOR II Olivenza 1 Orellana Palma del Río I Palma del Río

  3. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  4. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less

  5. A new species of Eimeria Schneider, 1875 from the Serra dos Órgãos National Park, Rio de Janeiro, Brazil, with notes on its endogenous development in the montane grass mouse, Akodon montensis Thomas, 1913 (Rodentia: Sigmodontinae).

    PubMed

    de Santana Miglionico, Marcos Tobias; Viana, Lúcio André; Barbosa, Helene Santos; Mota, Ester Maria; da Costa Neto, Sócrates Fraga; Frazão-Teixeira, Edwards; D'Andrea, Paulo Sergio

    2018-02-01

    A total of 53 specimens of the montane grass mouse, Akodon montensis Thomas, 1913 were collected in the Serra dos Órgãos National Park (SONP) in November 2014 and July 2015. The fecal material was analyzed, and a prevalence of 7.5% was recorded for a new coccidian species of the genus Eimeria Schneider, 1875, with part of its endogenous development recorded in the small intestine. The oocysts of a new coccidian species of genus Eimeria are ellipsoidal to subspherical. The wall is bi-layered, c. 1.5 μm (1.3-1.6 μm) thick, outer layer rough. Oocyst (n = 126) mean length is 25.3 μm (21.0-28.0 μm), with a width of 20.2 μm (17.0-22.0 μm) and mean length/width (L:W) ratio of 1.3 (1.2-1.4). Polar granule is present, with the oocyst residuum as a large spherical to subspherical globule. Sporocyst shape (n = 126) is ellipsoidal, with a mean length of 11.8 μm (9.3-14.4 μm), width of 7.9 μm (6.7-9.3 μm), and mean L:W ratio of 1.5 (1.4-1.7). Sporocysts with nipple-like Stieda body and sub-Stieda body are absent. A sporocyst residuum formed by several globules, usually along the sporocyst wall. This is the first record of Eimeria in the montane grass mouse from Brazil.

  6. The Serra de Tramuntana World Heritage Site (Mallorca, Spain). Landslide activity valuation by means of Persistent Scatterers Interferometry

    NASA Astrophysics Data System (ADS)

    Mateos, Rosa Maria; Bianchini, Silvia; Herrera, Gerardo; Garcia, Inmaculada; Sanabria, Margarita

    2016-04-01

    The Serra de Tramuntana, which forms the backbone of the north-west of Mallorca (Spain), was declared in 2011 World Heritage Site by UNESCO under the cultural landscape category. The particular landscape of this range is the fruit of the exchange of knowledge between cultures, with small-scale works performed collectively for a productive aim, conditioned by the limitations imposed by the physical medium. The steep topography of the chain, highly related to its geological complexity, and the Mediterranean climate, influence intense slope dynamics with the consequent multiple types of slope failures: rock slides, earth landslides and rockfalls, which cause significant damage and specifically to the road network (Mateos, 2013a). The human landscape marked by agricultural terraces (dry stone constructions) has significantly contributed to the slope stability in the range for centuries. In the present work, a landslide inventory map with 918 events has been updated and the landslides state of activity was analyzed exploiting 14 ALOS PALSAR satellite SAR (Synthetic Aperture Radar) images acquired during the period 2007-2010. Landslide activity maps were elaborated through the use of PSI (Persistent Scatterers Interferometry) technique (Bianchini et al., 2013). Besides assessing the PS visibility of the study area according to the relief, land use and satellite acquisition parameters, these maps evaluate, for every monitored landslide, the average velocities along the satellite Line Of Sight (VLOS) and along the maximum local steepest slope (VSLOPE), providing an estimate of their state of activity and their potential to cause damages. Additionally, a ground motion activity map is also generated, based on active PS clusters not included within any mapped landslide phenomenon. A confidence degree evaluation is carried out to attest the reliability of measured displacements to represent landslide dynamics. Results show that 42 landslides were identified as active (VSLOPE

  7. Concentrating Solar Power Projects - Genesis Solar Energy Project |

    Science.gov Websites

    Concentrating Solar Power | NREL Genesis Solar Energy Project This page provides information on the Genesis Solar Energy Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. The Project includes two 125-MW units incorporating

  8. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    PubMed

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  9. Project Notes

    ERIC Educational Resources Information Center

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  10. Concentrating Solar Power Projects - eCare Solar Thermal Project |

    Science.gov Websites

    Concentrating Solar Power | NREL eCare Solar Thermal Project This page provides information on eCare Solar Thermal Project, a concentrating solar power (CSP) project, with data organized by Project Name: eCare Solar Thermal Project Country: Morocco Location: Undefined Owner(s): CNIM (100

  11. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  12. Information and Communications Technology (ICT) Infrastructure for the ASTRI SST-2M telescope prototype for the Cherenkov Telescope Array

    NASA Astrophysics Data System (ADS)

    Gianotti, F.; Tacchini, A.; Leto, G.; Martinetti, E.; Bruno, P.; Bellassai, G.; Conforti, V.; Gallozzi, S.; Mastropietro, M.; Tanci, C.; Malaguti, G.; Trifoglio, M.

    2016-08-01

    The Cherenkov Telescope Array (CTA) represents the next generation of ground-based observatories for very high energy gamma-ray astronomy. The CTA will consist of two arrays at two different sites, one in the northern and one in the southern hemisphere. The current CTA design foresees, in the southern site, the installation of many tens of imaging atmospheric Cherenkov telescopes of three different classes, namely large, medium and small, so defined in relation to their mirror area; the northern hemisphere array would consist of few tens of the two larger telescope types. The Italian National Institute for Astrophysics (INAF) is developing the Cherenkov Small Size Telescope ASTRI SST- 2M end-to-end prototype telescope within the framework of the International Cherenkov Telescope Array (CTA) project. The ASTRI prototype has been installed at the INAF observing station located in Serra La Nave on Mt. Etna, Italy. Furthermore a mini-array, composed of nine of ASTRI telescopes, has been proposed to be installed at the Southern CTA site. Among the several different infrastructures belonging the ASTRI project, the Information and Communication Technology (ICT) equipment is dedicated to operations of computing and data storage, as well as the control of the entire telescope, and it is designed to achieve the maximum efficiency for all performance requirements. Thus a complete and stand-alone computer centre has been designed and implemented. The goal is to obtain optimal ICT equipment, with an adequate level of redundancy, that might be scaled up for the ASTRI mini-array, taking into account the necessary control, monitor and alarm system requirements. In this contribution we present the ICT equipment currently installed at the Serra La Nave observing station where the ASTRI SST-2M prototype will be operated. The computer centre and the control room are described with particular emphasis on the Local Area Network scheme, the computing and data storage system, and the

  13. Shop Projects.

    ERIC Educational Resources Information Center

    Patton, Bob

    Vocational agriculture teachers in Oklahoma prepared the shop project drawings which comprise the document. Seventy-one projects, with lists of required materials, diagrams, and measurements, are included. Construction projects fall into six categories (number of projects in parentheses): Trailers (5), racks (3), livestock production projects…

  14. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  15. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    NASA Astrophysics Data System (ADS)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  16. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  17. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  18. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  19. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  20. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  1. Concentrating Solar Power Projects - eLLO Solar Thermal Project |

    Science.gov Websites

    Concentrating Solar Power | NREL eLLO Solar Thermal Project This page provides information on Llo Solar Thermal Project, a concentrating solar power (CSP) project, with data organized by Name: eLLO Solar Thermal Project (Llo) Country: France Location: Llo (Pyrénées Orientales) Owner(s

  2. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    ERIC Educational Resources Information Center

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  3. Climate Projections from the NARCliM Project: Bayesian Model Averaging of Maximum Temperature Projections

    NASA Astrophysics Data System (ADS)

    Olson, R.; Evans, J. P.; Fan, Y.

    2015-12-01

    NARCliM (NSW/ACT Regional Climate Modelling Project) is a regional climate project for Australia and the surrounding region. It dynamically downscales 4 General Circulation Models (GCMs) using three Regional Climate Models (RCMs) to provide climate projections for the CORDEX-AustralAsia region at 50 km resolution, and for south-east Australia at 10 km resolution. The project differs from previous work in the level of sophistication of model selection. Specifically, the selection process for GCMs included (i) conducting literature review to evaluate model performance, (ii) analysing model independence, and (iii) selecting models that span future temperature and precipitation change space. RCMs for downscaling the GCMs were chosen based on their performance for several precipitation events over South-East Australia, and on model independence.Bayesian Model Averaging (BMA) provides a statistically consistent framework for weighing the models based on their likelihood given the available observations. These weights are used to provide probability distribution functions (pdfs) for model projections. We develop a BMA framework for constructing probabilistic climate projections for spatially-averaged variables from the NARCliM project. The first step in the procedure is smoothing model output in order to exclude the influence of internal climate variability. Our statistical model for model-observations residuals is a homoskedastic iid process. Comparing RCMs with Australian Water Availability Project (AWAP) observations is used to determine model weights through Monte Carlo integration. Posterior pdfs of statistical parameters of model-data residuals are obtained using Markov Chain Monte Carlo. The uncertainty in the properties of the model-data residuals is fully accounted for when constructing the projections. We present the preliminary results of the BMA analysis for yearly maximum temperature for New South Wales state planning regions for the period 2060-2079.

  4. Map projections

    USGS Publications Warehouse

    ,

    1993-01-01

    A map projection is used to portray all or part of the round Earth on a flat surface. This cannot be done without some distortion. Every projection has its own set of advantages and disadvantages. There is no "best" projection. The mapmaker must select the one best suited to the needs, reducing distortion of the most important features. Mapmakers and mathematicians have devised almost limitless ways to project the image of the globe onto paper. Scientists at the U. S. Geological Survey have designed projections for their specific needs—such as the Space Oblique Mercator, which allows mapping from satellites with little or no distortion. This document gives the key properties, characteristics, and preferred uses of many historically important projections and of those frequently used by mapmakers today.

  5. Projection, introjection, and projective identification: a reformulation.

    PubMed

    Malancharuvil, Joseph M

    2004-12-01

    In this essay, the author recommends a reformulation of the psychoanalytic concept of projection. The author proposes that projective processes are not merely defensive maneuvers that interfere with perception, but rather an essential means by which human perception is rendered possible. It is the manner in which human beings test and-evaluate reality in terms of their experiential structure, and their needs for survival and nourishment. Projection is the early phase of introjection.

  6. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  7. Concentrating Solar Power Projects - Linear Fresnel Reflector Projects |

    Science.gov Websites

    Kimberlina solar thermal power plant, a linear Fresnel reflector system located near Bakersfield, California Solar Thermal Project eLLO Solar Thermal Project (Llo) IRESEN 1 MWe CSP-ORC pilot project Kimberlina Solar Thermal Power Plant (Kimberlina) Liddell Power Station Puerto Errado 1 Thermosolar Power Plant

  8. Airborne gamma-ray and magnetic anomaly signatures of serpentinite in relation to soil geochemistry, northern California

    USGS Publications Warehouse

    McCafferty, A.E.; Van Gosen, B. S.

    2009-01-01

    Serpentinized ultramafic rocks and associated soils in northern California are characterized by high concentrations of Cr and Ni, low levels of radioelements (K, Th, and U) and high amounts of ferrimagnetic minerals (primarily magnetite). Geophysical attributes over ultramafic rocks, which include airborne gamma-ray and magnetic anomaly data, are quantified and provide indirect measurements on the relative abundance of radioelements and magnetic minerals, respectively. Attributes are defined through a statistical modeling approach and the results are portrayed as probabilities in chart and map form. Two predictive models are presented, including one derived from the aeromagnetic anomaly data and one from a combination of the airborne K, Th and U gamma-ray data. Both models distinguish preferential values within the aerogeophysical data that coincide with mapped and potentially unmapped ultramafic rocks. The magnetic predictive model shows positive probabilities associated with magnetic anomaly highs and, to a lesser degree, anomaly lows, which accurately locate many known ultramafic outcrops, but more interestingly, locate potentially unmapped ultramafic rocks, possible extensions of ultramafic bodies that dip into the shallow subsurface, as well as prospective buried ultramafic rocks. The airborne radiometric model shows positive probabilities in association with anomalously low gamma radiation measurements over ultramafic rock, which is similar to that produced by gabbro, metavolcanic rock, and water bodies. All of these features share the characteristic of being depleted in K, Th and U. Gabbro is the only rock type in the study area that shares similar magnetic properties with the ultramafic rock. The aerogeophysical model results are compared to the distribution of ultramafic outcrops and to Cr, Ni, K, Th and U concentrations and magnetic susceptibility measurements from soil samples. Analysis of the soil data indicates high positive correlation between

  9. Project Scoping Guidebook for Metropolitan Planning Organization Transportation Projects

    DOT National Transportation Integrated Search

    2017-08-01

    To obtain state and federal funding for proposed transportation projects in metropolitan areas, local governments submit project proposals to their Metropolitan Planning Organization (MPO) during the early stages of project planning. The purpose of t...

  10. Manpower Projection Model Project, Ventura County.

    ERIC Educational Resources Information Center

    Van Zant, John L.; Lawson, William H.

    The final report on Phase 1 of the Manpower Projection Model (MPM) Project provides a guide for implementation of the model system by area Vocational Education Practitioners within any Standard Metropolitan Statistical Area (SMSA). A cooperative effort between Ventura County Superintendent of Schools Office and the Community College District, the…

  11. Watchdog Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett; Campbell, Jack; Hadley, Mark

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to havemore » strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the

  12. The roughness of grounded ice sheet beds: Case studies from high resolution radio echo sounding studies in Antarctica

    NASA Astrophysics Data System (ADS)

    Young, Duncan; Blankeship, Donald; Beem, Lucas; Cavitte, Marie; Quartini, Enrica; Lindzey, Laura; Jackson, Charles; Roberts, Jason; Ritz, Catherine; Siegert, Martin; Greenbaum, Jamin; Frederick, Bruce

    2017-04-01

    The roughness of subglacial interfaces (as measured by airborne radar echo sounding) at length scales between profile line spacing and the footprint of the instrument is a key, but complex, signature of glacial and geomorphic processes, material lithology and integrated history at the bed of ice sheets. Subglacial roughness is also intertwined with assessments of ice thickness uncertainty using radar echo sounding, the utility of interpolation methodologies, and a key aspect of subglacial assess strategies. Here we present an assessment of subglacial roughness estimation in both West and East Antarctica, and compare this to exposed subglacial terrains. We will use recent high resolution aerogeophysical surveys to examine what variations in roughness are a fingerprint for, assess the limits of ice thickness uncertainty quantification and compare strategies for roughness assessment and utilization.

  13. High-resolution airborne gravity imaging over James Ross Island (West Antarctica)

    USGS Publications Warehouse

    Jordan, T.A.; Ferraccioli, F.; Jones, P.C.; Smellie, J.L.; Ghidella, M.; Corr, H. F. J.; Zakrajsek, A.F.

    2007-01-01

    James Ross Island (JRI) exposes a Miocene-Recent alkaline basaltic volcanic complex that developed in a back-arc, east of the northern Antarctic Peninsula. JRI has been the focus of several geological studies because it provides a window on Neogene magmatic processes and paleoenvironments. However, little is known about its internal structure. New airborne gravity data were collected as part of the first high-resolution aerogeophysical survey flown over the island and reveal a prominent negative Bouguer gravity anomaly over Mt Haddington. This is intriguing as basaltic volcanoes are typically associated with positive Bouguer anomalies, linked to underlying mafic intrusions. The negative Bouguer anomaly may be associated with a hitherto unrecognised low-density sub-surface body, such as a breccia-filled caldera, or a partially molten magma chamber.

  14. Building Excellence in Project Execution: Integrated Project Management

    DTIC Science & Technology

    2015-04-30

    challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution...Systems Center Pacific (SSC Pacific) is addressing this challenge by adopting and refining the CMMI Model, and building the tenets of integrated project...successfully managing stakeholder expectations and meeting requirements. Under the Capability Maturity Model Integration ( CMMI ), IPM is defined as

  15. Enameloid microstructure of the serrated cutting edges in certain fossil carcharhiniform and lamniform sharks.

    PubMed

    Andreev, Plamen S

    2010-07-01

    The triple-layered enameloid organization of neoselachian teeth has proven to be a reliable systematic character of the group. This study uses scanning electron microscopy to investigate the orientation of the parallel enameloid bundles in the area of the serrated cutting edges in certain fossil elasmobranchs. The examined teeth come from two Upper Cretaceous Squalicorax species and the Upper Miocene carcharhiniforms Galeocerdo sp., Carcharhinus sp., and Hemipristis serra. The parallel bundles are revealed by surface etching, which removes the superficial shiny-layered enameloid. In the teeth of Squalicorax, the bundles around the cutting edge bend once, before they reach the serrations. The studied carcharhiniform species show a more complicated pattern with a change of parallel bundle course inside the serrations. H. serra teeth do not display the first bending of the bundles, whereas it was present in the other two carcharhiniforms. The course of the crystalline bundles in both Squalicorax species is not affected by the presence of the serrations, regardless of the twofold difference in tooth size between them. In the carcharhiniform species, the bended bundles occur within the primary and secondary serrations and are always associated with them. This feature might have functional significance by strengthening the cutting edge or could simply develop as a consequence of the enameloid mineralization around the individual serrae. (c) 2009 Wiley-Liss, Inc.

  16. ESR dating of Smilodon populator from Toca de Cima dos Pilão, Piauí, Brazil.

    PubMed

    Kinoshita, Angela; Mollemberg, Michelle; Santana, William; G Figueiredo, Ana Maria; Guidon, Niede; Fátima da Luz, Maria de; Guérin, Claude; Baffa, Oswaldo

    2017-02-01

    Smilodon is a genus of big cats that lived from the early to the late Pleistocene in regions extending from North to South America. The fossil records of the "saber-toothed cats" are uneven, with some taxa being quite abundant in certain regions. In Brazil, Smilodon populator is a well-known species whose remains, although scarce in comparison to other large mammals, are found all across the country. In particular, there are multiple records of this species in the region of the Serra da Capivara National Park. This area was home to a rich Pleistocene-Holocene fauna, including many mammals. Here, we report on the Electron Spin Resonance dating of a Smilodon populator tooth found in "Toca de Cima dos Pilão", located in the surroundings of the Serra da Capivara National Park. The equivalent dose found after exponential fitting of dose-response curve was (2.7±0.3)x10 2 Gy. Neutron Activation Analysis was used to determine the concentration of radioisotopes present in the sample and in the sediment to calculate the internal and external dose rates. The result of age found is 93±9ka, which confirmed the presence of this species in Serra da Capivara National Park in the late Pleistocene. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. ART/Ada design project, phase 1: Project plan

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.

    1988-01-01

    The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.

  18. Project: "Project!"

    ERIC Educational Resources Information Center

    Grayson, Katherine

    2007-01-01

    In November 2006, the editors of "Campus Technology" launched their first-ever High-Resolution Projection Study, to find out if the latest in projector technology could really make a significant difference in teaching, learning, and educational innovation on US campuses. The author and her colleagues asked campus educators,…

  19. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  20. Foreword

    NASA Astrophysics Data System (ADS)

    Giard, M.; Ristorcelli, I.

    scientific work, and because he had always considered the collective interest as a priority, he was someone who thought deeply about astronomy as a science and about its evolution in France. He devoted a lot of energy to such reflections and played an active role in local and national committees. Among the ideas he defended was that the standing of astronomy as a science depends on a unity between modelling and observation. He particularly liked to point out that similar advanced physics is needed both in the field of instrumentation and in the astrophysical modelling. He considered instrumentation as an essential component in astronomy, that had to be continuously developed, and to remain a part of the astronomers activity. He also liked to emphasize the importance of the collective aspect in the success of a project, which directly depend on researchers and engineers working together as a team. He was also extremely active in developing interfaces and cooperation with others communities: physicists, chemists, mathematicians, biologists. He considered that this was the best way to trigger great leap forward for astronomy. Guy Serra was a real pillar for many of us who worked with him. He was a dazzingly talented friend, passionate not only to astrophysics, but also for history, philosophy, music. Guy was a lover of nature and of life, remarquably altruist, and always concerned with the collective interest. His sudden departure has left a tremendous empty space. The memory of Guy , smiling warmly, with his sparkling eyes full of intelligence and sensitivity shall always remain in our hearts. M. Giard I. Ristorcelli

  1. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  2. Perceptions of Project Representatives Concerning Project Success and Pre-Project Planning Effort

    DTIC Science & Technology

    1993-12-01

    25 Table 2. What are your main reasons for the project’s level of success? ........... 28 Table 3. What , if anything...Table 3a. Other Categories for Table 3 .......................................................... 32 Table 4. What are your main reasons for your...assessment of the level of effort expended on pre-project planning? ............................. ....... .. .......... .. . .. 33 Table 5. What concerning

  3. Highlight removal based on the regional-projection fringe projection method

    NASA Astrophysics Data System (ADS)

    Qi, Zhaoshuai; Wang, Zhao; Huang, Junhui; Xing, Chao; Gao, Jianmin

    2018-04-01

    In fringe projection profilometry, highlight usually causes the saturation and blooming in captured fringes and reduces the measurement accuracy. To solve the problem, a regional-projection fringe projection (RP-FP) method is proposed. Regional projection patterns (RP patterns) are projected onto the tested object surface to avoid the saturation and blooming. Then, an image inpainting technique is employed to reconstruct the missing phases in the captured RP patterns and a complete surface of the tested object is obtained. Experiments verified the effectiveness of the proposed method. The method can be widely used in industrial inspections and quality controlling in mechanical and manufacturing industries.

  4. Science project

    NASA Image and Video Library

    2012-08-23

    DRIFTER sensor devices were designed by the Applied Science and Technology Project Office as inexpensive tools that can be used for science projects in local schools. The devices transmit information about water temperature and conductivity for use by Gulf Coast researchers. The DRIFTER project began as an effort to help Gulf Coast oyster fishermen dealing with the effects of fresh water intrusion.

  5. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  6. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  7. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    ERIC Educational Resources Information Center

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  8. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  9. Project HOLD: A Secondary Learning Disability Project.

    ERIC Educational Resources Information Center

    Snyder, Marjorie Sims

    This document discusses Project HOLD, a Title VI-G Child Service Demonstration Center which was established as a cooperative effort between Northeast Louisiana University and the Ouachita Parish School System. The primary purpose of the project is to plan, explore, implement, and refine a program for students in grades 7 through 12 who have been…

  10. GHPsRUS Project

    DOE Data Explorer

    Battocletti, Liz

    2013-07-09

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  11. Educational Project Management Instructional System. Module One. Project Management Executive Orientation.

    ERIC Educational Resources Information Center

    Cummings, C. Peter; Cook, Desmond L.

    This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…

  12. Construction Project Management for RED HORSE Troop Training Projects

    DTIC Science & Technology

    1989-02-02

    estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters

  13. 3. Historic American Buildings Survey Photographed by Henry F. Withey ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Historic American Buildings Survey Photographed by Henry F. Withey April 1937. RUINS OF SMITHY (LOOKING S.W.) - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  14. 9. Historic American Buildings Survey Photographed by Henry F. Withey ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Historic American Buildings Survey Photographed by Henry F. Withey April 1937 RUINS OF TANNERY (FROM WEST CORNER) - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  15. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    ERIC Educational Resources Information Center

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  16. Concentrating Solar Power Projects - Hami 50 MW CSP Project | Concentrating

    Science.gov Websites

    Solar Power | NREL Hami 50 MW CSP Project Status Date: April 6, 2018 Project Overview Project MW Status: Under construction Do you have more information, corrections, or comments? Background Technology: Power tower Status: Under construction Country: China City: Hami Region: Xinjiang Autonomous

  17. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    NASA Technical Reports Server (NTRS)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  18. Underestimation of Project Costs

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  19. Muscle activation during push-ups performed under stable and unstable conditions.

    PubMed

    Borreani, Sebastien; Calatayud, Joaquin; Colado, Juan Carlos; Moya-Nájera, Diego; Triplett, N Travis; Martin, Fernando

    2015-12-01

    The purpose of this study was to analyze muscle activation when performing push-ups under different stability conditions. Physically fit young male university students ( N  = 30) performed five push-ups under stable conditions (on the floor) and using four unstable devices (wobble board, stability disc, fitness dome, and the TRX Suspension Trainer). The push-up speed was controlled using a metronome, and the testing order was randomized. The average amplitudes of the electromyographic (EMG) root mean square of the anterior deltoid (DELT), serratus anterior (SERRA), lumbar multifidus (LUMB), and rectus femoris (FEM) were recorded. The electromyographic signals were normalized to the maximum voluntary isometric contraction (MVIC). No significant differences were found for the DELT [ F (4,112) = 1.978; p  = 0.130] among the conditions. However, statistically significant differences were found among the different conditions for the SERRA [ F (4,60) = 17.649; p  < 0.001], LUMB [ F (4,76) = 12.334; p  < 0.001], and FEM [ F (4,104) = 24.676; p  < 0.001] muscle activation. The suspended device was the only condition that elicited higher LUMB and FEM activation compared to the other conditions. Push-ups performed on the floor showed lower SERRA activation than those performed with all unstable devices. Not all unstable devices enhance muscle activation compared to traditional push-ups.

  20. 4. Historic American Buildings Survey Photographed by Henry F. Withey ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Historic American Buildings Survey Photographed by Henry F. Withey April 1937 RUINS OF SMITHY FROM SO. WEST CORNER. - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  1. 8. Historic American Buildings Survey Photographed by Henry F. Withey ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Historic American Buildings Survey Photographed by Henry F. Withey April 1937 RUINS OF SOAP FACTORY FROM EAST CORNER. - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  2. 7. Historic American Buildings Survey Photographed by Henry F. Withey ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Historic American Buildings Survey Photographed by Henry F. Withey April 1937 RUINS OF SOAP FACTORY (S. W. Side) - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  3. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    NASA Astrophysics Data System (ADS)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  4. 51. Projection room, looking SW. Original Movietone projection equipment intact. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Projection room, looking SW. Original Movietone projection equipment intact. Old photo label identifying directional view is inaccurate. This image proves the projection room was expanded southward from its original design prior to the theatre's opening (see also photo WA-197-36). - Fox Theater, Seventh Avenue & Olive Way, Seattle, King County, WA

  5. The Inter-Sectoral Impact Model Intercomparison Project (ISI–MIP): Project framework

    PubMed Central

    Warszawski, Lila; Frieler, Katja; Huber, Veronika; Piontek, Franziska; Serdeczny, Olivia; Schewe, Jacob

    2014-01-01

    The Inter-Sectoral Impact Model Intercomparison Project offers a framework to compare climate impact projections in different sectors and at different scales. Consistent climate and socio-economic input data provide the basis for a cross-sectoral integration of impact projections. The project is designed to enable quantitative synthesis of climate change impacts at different levels of global warming. This report briefly outlines the objectives and framework of the first, fast-tracked phase of Inter-Sectoral Impact Model Intercomparison Project, based on global impact models, and provides an overview of the participating models, input data, and scenario set-up. PMID:24344316

  6. Little River Project.

    ERIC Educational Resources Information Center

    Naisbitt, Ian

    1995-01-01

    Describes the adoption of an old riverside landfill by an elementary school as a Habitat 2000 community project. Contains a "how-to" checklist for such a project, information on building school-community community partnerships, and promotional ideas for stewardship projects. (LZ)

  7. 1. Historic American Buildings Survey, Photographed by Frederick Scholer, April ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Historic American Buildings Survey, Photographed by Frederick Scholer, April 7th, 1934 VIEW TOWARD NORTH OF RUINS IN GARDEN - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  8. 5. Historic American Buildings Survey Photographed by Henry F. Withey ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Historic American Buildings Survey Photographed by Henry F. Withey April 1937 RUINS OF SMITHY AND SOAP FACTORY (LOOKING SOUTH) - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  9. 40 CFR 403.20 - Pretreatment Program Reinvention Pilot Projects Under Project XL.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Pretreatment Program Reinvention Pilot Projects Under Project XL. 403.20 Section 403.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... OF POLLUTION § 403.20 Pretreatment Program Reinvention Pilot Projects Under Project XL. The Approval...

  10. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  11. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  12. The Environmental Management Project Manager`s Handbook for improved project definition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, whichmore » is the focus of this handbook.« less

  13. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    ERIC Educational Resources Information Center

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  14. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  15. Assessing the Relationship between Ethical Project Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Howell, Byron Winter

    2010-01-01

    The purpose of this quantitative study was to assess the relationship between ethical project management and information technology (IT) project success. The success of IT projects is important for organizational success, but the rate of IT projects is historically low, costing billions of dollars annually. Using four key ethical variables…

  16. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  17. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  18. Research Projects 1968.

    ERIC Educational Resources Information Center

    Swedish Council for Personnel Administration, Stockholm.

    The 39 research projects described cover several fields within the social and behavioral sciences related to personnel administration. The project description format includes: (1) project title, (2) principal investigator, (3) institution, (4) advisor, (5) grants, (6) background and purpose, (7) scope, material, methods, experimental design, (8)…

  19. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  20. 2. Historic American Buildings Survey Photographed by Henry F. Withey ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Historic American Buildings Survey Photographed by Henry F. Withey April 1937 RUINS OF FOUNTAIN, SMITHY AND SOAP FACTORY (LOOKING EAST) - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  1. Cooperative Projects - Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Schubotz, Wiebke; Brücher, Tim; Vamborg, Freja

    2017-04-01

    Today's research in Germany is often organized in large projects and collaborations, so-called cooperative projects ("Verbundprojekte" in German). These projects are defined by a large number of members (more than 50) and participating institutes, e.g. institutes of research organizations such as the Max-Planck society and the Leibniz association, Helmholtz centres, and universities. For coordination purposes these projects usually have a general project manager or project coordinator close to the speaker of the project. Despite this overarching position, it is often challenging for the project manager to really overview the entire project as he is, for example, not involved in the individual institute's recruitment processes or research connections to other institutes via other projects. Additionally, there is neither a formal obligation for the principal investigators and project scientists to report changes within their sub-projects, nor any formal dependency between these sub-projects and the coordination office to ensure a contemporary update of changes and progress in their specific tasks of the project. Therefore, the idea of a coordinating position to oversee the entire cooperative project is sometimes difficult to reach. Furthermore, project managers usually have no formal connection to other project managers. This means that recurrent tasks, for which cooperation between project managers would be helpful, need to be reinvented for each project anew. Due to the lack of this more formalized cooperation between project managers, acquired expertise is often lost. We will illustrate the challenges of this kind of project management based on projects at the Max Planck Institute for Meteorology (Hamburg) and the Helmholtz Centre for Ocean Research (GEOMAR, Kiel), but also point out opportunities that arise within a large collaboration of partners. Moreover, we present an approach to coordinate management processes in order to overcome some of the aforementioned

  2. The Proposal Project

    ERIC Educational Resources Information Center

    Pierce, Elizabeth

    2007-01-01

    The proposal project stretches over a significant portion of the semester-long sophomore course Professional Communication (ENG 250) at Monroe Community College. While developing their proposal project, students need to use time management skills to successfully complete a quality project on time. In addition, excellent oral and written…

  3. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  4. Past Project Expo Sites

    EPA Pesticide Factsheets

    This page provides information for Project Expo sites that were featured at the LMOP Conferences in 2013 and 2014. Project Expo sites were featured as being interested in identifying project partners for the development of an LFG energy project.

  5. Simple projects guidebook : federal-aid procedure for simple projects

    DOT National Transportation Integrated Search

    2002-06-01

    Experience has shown that a simple project generally 1) does not have any right-of-way involvement and 2) has a Programmatic Categorical Exclusion or Categorical Exclusion environmental determination. Page 7 outlines the definition of simple projects...

  6. Projection: A Bibliography.

    ERIC Educational Resources Information Center

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  7. Harvard Observing Project (HOP): Involving Undergraduates in Research Projects

    NASA Astrophysics Data System (ADS)

    Bieryla, Allyson

    2017-01-01

    The Harvard Observing Project (HOP) is designed to get students excited about observational astronomy while collecting data valuable to the scientific community. The primary goal is to give undergraduates a chance to try out observing with “no strings attached”. Observations are led by experienced observers, mostly graduate students. This not only gives graduate students extra opportunities to interact and teach undergraduates, but also a chance for them to get more observing experience. Each semester, we choose an interesting target and monitor it each week over the course of the semester using Harvard University’s 16-inch DFM Clay Telescope. These observing projects often produce large amounts of data. This provides an excellent dataset for a young undergraduate to analyze. Some successful semester-long observing projects have included variable stars, supernova and binary systems. Short-term projects have included exoplanet candidate followup, asteroid and comet followup and collaborating with the Pro-Am White Dwarf Monitoring (PAWM) project in attempts to detect a transiting Earth-sized planet orbiting a white dwarf. Each dataset is an opportunity for an undergraduate to be introduced to scientific research and present the results to the community.

  8. Researchers' experience with project management in health and medical research: Results from a post-project review

    PubMed Central

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  9. Post-project geomorphic assessment of a large process-based river restoration project

    USGS Publications Warehouse

    Erwin, Susannah O.; Schmidt, John C.; Allred, Tyler M.

    2016-01-01

    This study describes channel changes following completion of the Provo River Restoration Project (PRRP), the largest stream restoration project in Utah and one of the largest projects in the United States in which a gravel-bed river was fully reconstructed. We summarize project objectives and the design process, and we analyze monitoring data collected during the first 7 years after project completion. Post-project channel adjustment during the study period included two phases: (i) an initial phase of rapid, but small-scale, adjustment during the first years after stream flow was introduced to the newly constructed channel and (ii) a subsequent period of more gradual topographic adjustment and channel migration. Analysis of aerial imagery and ground-survey data demonstrate that the channel has been more dynamic in the downstream 4 km where a local source contributes a significant annual supply of bed material. Here, the channel migrates and exhibits channel adjustments that are more consistent with project objectives. The upstream 12 km of the PRRP are sediment starved, the channel has been laterally stable, and this condition may not be consistent with large-scale project objectives.

  10. The Sidewalk Project

    ERIC Educational Resources Information Center

    Church, William

    2005-01-01

    In this article, the author features "the sidewalk project" in Littleton High School. The sidewalk project is a collaboration of more than 40 high school physics students, 10 local mentors, and a few regional and national organizations who worked together to invent a way to heat a sidewalk with an alternative energy source. The project, which…

  11. Designing Effective Projects: Decision Options for Maximizing Learning and Project Success

    ERIC Educational Resources Information Center

    Volkema, Roger J.

    2010-01-01

    In recent years, more and more business schools have introduced team-based projects into their curricula as a means of addressing corporate, small business, and community-service issues while teaching students a variety of project management skills (technical and sociocultural). In designing a project-oriented course, an instructor has a number of…

  12. The Project Approach Catalog 2 by the Project Approach Study Group.

    ERIC Educational Resources Information Center

    Helm, Judy Harris, Ed.

    Projects are in-depth studies of a topic undertaken by a class, a group, or an individual child. Projects are intended to strengthen children's dispositions to be interested, absorbed, and involved in in-depth observation, investigation, and representation of worthwhile phenomena in their own environments. This Catalog on the Project Approach, the…

  13. 6. Historic American Buildings Survey Photographed by Henry F. Withey ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Historic American Buildings Survey Photographed by Henry F. Withey April 1937 RUINS OF SOAP FACTORY & SMITHY (FROM S. E. END OF SOAP FACTORY) - Mission San Gabriel Arcangel, Industrial Shop (Ruins), West Mission Drive & Junipero Serra Street, San Gabriel, Los Angeles County, CA

  14. Project Lodestar Special Report.

    ERIC Educational Resources Information Center

    Brown, Peggy, Ed.

    1981-01-01

    The Association of American Colleges' (AAC) Project Lodestar is addressed in an article and descriptions of the pilot phase of the project at 13 institutions. In "Project Lodestar: Realistically Assessing the Future," Peggy Brown provides an overview of the project, which is designed to help colleges and universities in assessment of…

  15. Project CHECO Southeast Asia Report. Project RED HORSE

    DTIC Science & Technology

    1969-09-01

    It 0,Il 1IC1I lll Examination of C’urrentI,,,,,,,,[ I prations IIR / IE IP𔃻 0 R IT - PROJECT RED HORSE 1 SEPTEMBER 1969 HQ PACAF Directorate...3 CHAPTER II RED HORSE ORGANIZATIONS IN SOUTHEAST ASIA .................. 5 Introduction...RED HORSE Combat Defense Teams....................... ...... 59 III. 555th CES (HR) Projects...................................... 62 IV. 820th CES

  16. Project CLIMB.

    ERIC Educational Resources Information Center

    DeLucca, Adolph

    1982-01-01

    As a state and national model for a basic skills curriculum for Kindergarten through grade 12 students, Coordination Learning Integration--Middlesex Basics (Project CLIMB) is described. The unified system was developed by teachers with administrative support to accomodate all students' reading and mathematics needs. Project CLIMB's development and…

  17. Puerto Rico`s EcoElectrica LNG/power project marks a project financing first

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lammers, R.; Taylor, S.

    1998-02-23

    On Dec. 15, 1997, Enron International and Kenetech Energy Services achieved financial close on the $670 million EcoElectrica liquefied natural gas terminal and cogeneration project proposed for Puerto Rico. The project involves construction of a liquefied natural gas terminal, cogeneration plant, and desalination unit on the southern coast of Puerto Rico, in the Penuelas/Guayanilla area. EcoElectrica will include a 500-mw, combined-cycle cogeneration power plant fueled mainly by LNG imported from the 400 MMcfd Atlantic LNG project on the island of Trinidad. Achieving financial close on a project of this size is always a time-consuming matter and one with a numbermore » of challenges. These challenges were increased by the unique nature of both the project and its financing--no project financing had ever before been completed that combined an LNG terminal and power plant. The paper discusses the project, financing details and challenges, key investment considerations, and integrated project prospects.« less

  18. Flat-plate solar array project. Volume 8: Project analysis and integration

    NASA Technical Reports Server (NTRS)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  19. The Canada Goose Project: A First Project with Children under 3

    ERIC Educational Resources Information Center

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  20. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    PubMed

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  1. Earth System Science Project

    ERIC Educational Resources Information Center

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  2. Interactions of the NAEG information support project with other projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pfuderer, H.A.

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site. (auth)

  3. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  4. NCMS ESS 2000 Project

    NASA Technical Reports Server (NTRS)

    Gibbel, Mark; Bellamy, Marvin; DeSantis, Charlie; Hess, John; Pattok, Tracy; Quintero, Andrew; Silver, R.

    1996-01-01

    ESS 2000 has the vision of enhancing the knowledge necessary to implement cost-effective, leading-edge ESS technologies and procedures in order to increase U.S. electronics industry competitiveness. This paper defines EES and discusses the factors driving the project, the objectives of the project, its participants, the three phases of the project, the technologies involved, and project deliverables.

  5. The 100 People Project

    ERIC Educational Resources Information Center

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  6. KSC History Project

    NASA Technical Reports Server (NTRS)

    Dethloff, Henry C.

    2001-01-01

    The KSC History Project focuses on archival research and oral history interviews on the history of Kennedy Space Center (KSC). Related projects include the preparation of a precis and chapter outline for a proposed book-length narrative history, a bibliography of key primary and secondary resources, a brief monograph overview of the history of KSC, and a monograph on the history of safety at the Center. Finally, there is work on the development of a web page and a personal history data base associated with the oral history project. The KSC History Project has been a joint endeavor between Henry C. Dethloff and Dr. Noble Lee Snaples, Jr.

  7. Sliding Window Generalized Kernel Affine Projection Algorithm Using Projection Mappings

    NASA Astrophysics Data System (ADS)

    Slavakis, Konstantinos; Theodoridis, Sergios

    2008-12-01

    Very recently, a solution to the kernel-based online classification problem has been given by the adaptive projected subgradient method (APSM). The developed algorithm can be considered as a generalization of a kernel affine projection algorithm (APA) and the kernel normalized least mean squares (NLMS). Furthermore, sparsification of the resulting kernel series expansion was achieved by imposing a closed ball (convex set) constraint on the norm of the classifiers. This paper presents another sparsification method for the APSM approach to the online classification task by generating a sequence of linear subspaces in a reproducing kernel Hilbert space (RKHS). To cope with the inherent memory limitations of online systems and to embed tracking capabilities to the design, an upper bound on the dimension of the linear subspaces is imposed. The underlying principle of the design is the notion of projection mappings. Classification is performed by metric projection mappings, sparsification is achieved by orthogonal projections, while the online system's memory requirements and tracking are attained by oblique projections. The resulting sparsification scheme shows strong similarities with the classical sliding window adaptive schemes. The proposed design is validated by the adaptive equalization problem of a nonlinear communication channel, and is compared with classical and recent stochastic gradient descent techniques, as well as with the APSM's solution where sparsification is performed by a closed ball constraint on the norm of the classifiers.

  8. Phylogeography of Tibouchina papyrus (Pohl) Toledo (Melastomataceae), an endangered tree species from rocky savannas, suggests bidirectional expansion due to climate cooling in the Pleistocene

    PubMed Central

    Collevatti, Rosane Garcia; de Castro, Thaís Guimarães; de Souza Lima, Jacqueline; de Campos Telles, Mariana Pires

    2012-01-01

    Many endemic species present disjunct geographical distribution; therefore, they are suitable models to test hypotheses about the ecological and evolutionary mechanisms involved in the origin of disjunct distributions in these habitats. We studied the genetic structure and phylogeography of Tibouchina papyrus (Melastomataceae), endemic to rocky savannas in Central Brazil, to test hypothesis of vicariance and dispersal in the origin of the disjunct geographical distribution. We sampled 474 individuals from the three localities where the species is reported: Serra dos Pirineus, Serra Dourada, and Serra de Natividade. Analyses were based on the polymorphisms at cpDNA and on nuclear microsatellite loci. To test for vicariance and dispersal we constructed a median-joining network and performed an analysis of molecular variance (AMOVA). We also tested population bottleneck and estimated demographic parameters and time to most recent common ancestor (TMRCA) using coalescent analyses. A remarkable differentiation among populations was found. No significant effect of population expansion was detected and coalescent analyses showed a negligible gene flow among populations and an ancient coalescence time for chloroplast genome. Our results support that the disjunct distribution of T. papyrus may represent a climatic relict. With an estimated TMRCA dated from ∼836.491 ± 107.515 kyr BP (before present), we hypothesized that the disjunct distribution may be the outcome of bidirectional expansion of the geographical distribution favored by the drier and colder conditions that prevailed in much of Brazil during the Pre-Illinoian glaciation, followed by the retraction as the climate became warmer and moister. PMID:22837846

  9. At daybreak--reproductive biology and isolating mechanisms of Cirrhaea dependens (Orchidaceae).

    PubMed

    Pansarin, E R; Bittrich, V; Amaral, M C E

    2006-07-01

    Floral biology, reproduction, pollinator specificity, and fruit set of Cirrhaea dependens were recorded in forest areas of Southeastern Brazil. Cirrhaea dependens is a lithophytic or epiphytic herb occurring very sparsely below dense canopies. Nearly all the flowers of a single plant open simultaneously before dawn. They are short-lasting and offer floral fragrances as rewards, which are collected by male euglossine bees. Observations carried out in mesophytic forests at Serra do Japi revealed that Euglossa VIRIDIS is their principal pollinator, with Eufriesea violacea a sporadic co-pollinator. Visitation started soon after flower opening, and attractiveness remained high for about 2 h, decreasing abruptly at sunrise. Flower anthesis with subsequent fragrance release seems to be correlated with bee attraction. Observations using chemical baits were carried out at Serra do Japi, and in the Atlantic Rain Forest of Picinguaba. Three euglossine species were captured with pollinaria of C. dependens in Picinguaba, whereas only E. violacea was attracted in Serra do Japi. In Picinguaba, C. dependens occurs sympatrically with C. saccata and C. loddigesii. Each species attracted different pollinators. The specificity and resulting reproductive isolation are due to the production of different odours by each orchid species. Cirrhaea dependens is self-compatible but pollinator-dependent. The reproductive success was low and appears to result from a combination of factors discussed here, such as the production of short-lived flowers, presence of floral mechanisms avoiding self-pollination, non-synchronization of flower phases among plants, and populations with few and sparsely distributed individuals.

  10. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    ERIC Educational Resources Information Center

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  11. The East Antarctic Ice Sheet and the Gamburtsev Subglacial Mountains (Invited)

    NASA Astrophysics Data System (ADS)

    Bell, R. E.; Studinger, M.; Ferraccioli, F.; Damaske, D.; Finn, C.; Braaten, D. A.; Fahnestock, M. A.; Jordan, T. A.; Corr, H.; Elieff, S.; Frearson, N.; Block, A. E.; Rose, K.

    2009-12-01

    Models of the onset of glaciation in Antarctica routinely document the early growth of the ice sheet on the summit of the Gamburtsev Subglacial Mountains in the center of the East Antarctic Craton. While ice sheet models replicate the formation of the East Antarctic ice sheet 35 million years ago, the age, evolution and structure of the Gamburtsev Mountains remain completely unresolved. During the International Polar Year scientists from seven nations have launched a major collaborative program (AGAP) to explore the Gamburtsev Subglacial Mountains buried by the East Antarctic ice sheet and bounded by numerous subglacial lakes. The AGAP umbrella is a multi-national, multi-disciplinary effort and includes aerogeophysics, passive seismology, traverse programs and will be complimented by future ice core and bedrock drilling. A major new airborne data set including gravity; magnetics; ice thickness; SAR images of the ice-bed interface; near-surface and deep internal layers; and ice surface elevation is providing insights into a more dynamic East Antarctica. More than 120,000 km of aerogeophysical data have been acquired from two remote field camps during the 2008/09 field season. AGAP effort was designed to address several fundamental questions including: 1) What role does topography play in the nucleation of continental ice sheets? 2) How do tectonic processes control the formation, distribution, and stability of subglacial lakes? The preliminary analysis of this major new data set indicated these 3000m high mountains are deeply dissected by a dendritic system. The northern margin of the mountain range terminates against the inland extent of the Lambert Graben. Evidence of the onset of glaciation is preserved as cirques and U shaped valleys along the axis of the uplifted massifs. The geomorphology reflects the interaction between the ice sheet and the Gamburtsev Mountains. Bright reflectors in the radar data in the deep valleys indicate the presence of water that has

  12. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  13. Fourth Year Status Report. Computerized Training Systems Project. Project ABACUS.

    DTIC Science & Technology

    1976-08-01

    in 7 9. PERFORMING ORGANIZATION NAME AND ADOMEN ,,, 10. PROGRAM ELEMENT. PROJECT , TASK US Army Tra ining Support Center A R E A S WORK UNIT NUMBERS...transp ired during the fourth year of Project ABACUS, the A rmy ’s program for the development of a Computerized Training System. It inc l udes a...have transpired durlnq the fourth year of Project ABACUS, the Army ’s program for the developmen t o~ aprototype Computer i zed Training System. It

  14. Project Wild (Project Tame).

    ERIC Educational Resources Information Center

    Siegenthaler, David

    For 37 states in the United States, Project Wild has become an officially sanctioned, distributed and funded "environemtnal and conservation education program." For those who are striving to implement focused, sequential, learning programs, as well as those who wish to promote harmony through a non-anthropocentric world view, Project…

  15. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  16. The Human Genome Diversity Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cavalli-Sforza, L.

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planningmore » stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.« less

  17. Mercury Project

    NASA Image and Video Library

    1959-04-27

    Astronaut L. Gordon Cooper, Jr., one of the original seven astronauts for Mercury Project selected by NASA on April 27, 1959. The MA-9 mission, boosted by the Mercury-Atlas launch vehicle, was the last flight of the Mercury Project. The Faith 7 spacecraft orbited the Earth 22 times in 1-1/2 days.

  18. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    ERIC Educational Resources Information Center

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  19. Acquisition des competences discursives dans un contexte plurilingue (Acquisition of Discourse Competencies in a Multilingual Context).

    ERIC Educational Resources Information Center

    Berthoud, Anne-Claude, Ed.

    1996-01-01

    This collection of articles on second language learning in a multilingual environment includes: "Franzosisch-Deutsch: Zweisprachiges Lernen au der Sekundarstufe 1" (French-German: Learning Two Languages at Secondary School, Level 1) (Otto Stern, Brigit Eriksson, Christine Le Pape, Hans Reutener, Cecilia Serra Oesch); "Das Projekt…

  20. Determinants of project success

    NASA Technical Reports Server (NTRS)

    Murphy, D. C.; Baker, B. N.; Fisher, D.

    1974-01-01

    The interactions of numerous project characteristics, with particular reference to project performance, were studied. Determinants of success are identified along with the accompanying implications for client organization, parent organization, project organization, and future research. Variables are selected which are found to have the greatest impact on project outcome, and the methodology and analytic techniques to be employed in identification of those variables are discussed.

  1. Project HIRE.

    ERIC Educational Resources Information Center

    Weisz, Vera C.

    Project HIRE is a special program conducted by Middlesex Community College since October 1978 to help people 55 years of age and older find paid employment. The specific goals of the project, as it was originally conceived, were to: (1) open three intake centers; (2) register clients at the centers; (3) provide career counseling; (4) offer…

  2. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  3. Evaluation of Project Symbiosis: An Interdisciplinary Science Education Project.

    ERIC Educational Resources Information Center

    Altschuld, James W.

    1993-01-01

    The goal of this report is to provide a summary of the evaluation of Project Symbiosis which focused on enhancing the teaching of science principles in high school agriculture courses. The project initially involved 15 teams of science and agriculture teachers and was characterized by an extensive evaluation component consisting of six formal…

  4. The project management office: transforming healthcare in the context of a hospital redevelopment project.

    PubMed

    Richer, Marie-Claire; Marchionni, Caroline; Lavoie-Tremblay, Melanie; Aubry, Monique

    2013-01-01

    It has been shown that classifying projects into a typology allows improved allocation of resources and promotes project success. However, a typology of healthcare projects has yet to be developed. The projects encountered by the Transition Support Office at the McGill University Health Centre in Montreal, Quebec, where a major redevelopment project is under way, were classified into a typology unique to the healthcare context. Examples of the 3 project types, Process, People, and Practice, are provided to clarify the specific support strategies and context-adapted interventions that were instrumental to their success.

  5. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  6. Multi-Role Project (MRP): A New Project-Based Learning Method for STEM

    ERIC Educational Resources Information Center

    Warin, Bruno; Talbi, Omar; Kolski, Christophe; Hoogstoel, Frédéric

    2016-01-01

    This paper presents the "Multi-Role Project" method (MRP), a broadly applicable project-based learning method, and describes its implementation and evaluation in the context of a Science, Technology, Engineering, and Mathematics (STEM) course. The MRP method is designed around a meta-principle that considers the project learning activity…

  7. KSC History Project

    NASA Technical Reports Server (NTRS)

    Snaples, Lee

    2001-01-01

    The project is a joint endeavor between Dr. Henry Dethloff and myself and is producing a number of products related to KSC history. This report is a summary of those projects. First, there is an overview monograph covering KSC history. Second, there is a chapter outline for an eventual book-length history. Third, there is monograph on safety at KSC. Finally, there is a web page and database dedicated to the KSC oral history project.

  8. Project ArchimedeZ

    DTIC Science & Technology

    2015-05-18

    of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering...describe the proposed content of Project ArchimedeZ, 4 ) describe incentives that Project ArchimedeZ will give to Total Force Airmen to participate and...engaged, most of the time, in some sort of PME but at a manageable level. Rather than a three- hour block, for example, Project ArchimedeZ would deliver

  9. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  10. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume I. Project conceptual design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) Project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The Project conceptual design is presented in this volume.« less

  11. An Innovative Project in Educational Technology: The Panama-Venezuela Project.

    ERIC Educational Resources Information Center

    Rojas, Alicia Mabel

    1980-01-01

    Describes a project which is being implemented in the field of educational technology in Panama and Venezuela. The project emphasizes inservice training of a cadre of professionals who will direct efforts to identify and resolve significant problems in education. (Author/CHC)

  12. SDN Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustainmore » critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  13. Project Artemis

    NASA Technical Reports Server (NTRS)

    Birchenough, Shawn; Kato, Denise; Kennedy, Fred; Akin, David

    1990-01-01

    The goals of Project Artemis are designed to meet the challege of President Bush to return to the Moon, this time to stay. The first goal of the project is to establish a permanent manned base on the Moon for the purposes of scientific research and technological development. The knowledge gained from the establishment and operations of the lunar base will then be used to achieve the second goal of Project Artemis, the establishment of a manned base on the Martian surface. Throughout both phases of the program, crew safety will be the number one priority. There are four main issues that have governed the entire program: crew safety and mission success, commonality, growth potential, and costing and scheduling. These issues are discussed in more detail.

  14. Research Projects for Undergraduates

    NASA Astrophysics Data System (ADS)

    Troncalli, Andra

    2010-03-01

    Physics majors, by enrolling in our research experience in physics course, have the opportunity to work in small groups on independent research projects. Over the last few years, I have directed a few of these research projects; some were closely related to my own research in the field of high temperature superconductivity, and students participated in growing and characterizing samples. Other projects involved nanotechnology, Hall probes, and programming in LabVIEW. For some students, this was their very first research project, while others had more experience. I will talk about the projects and about the particular type of challenges and benefits this type of course brings to both students and instructors.

  15. The Role of the Project Management Office on Information Technology Project Success

    ERIC Educational Resources Information Center

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  16. The Interactions among Information Technology Organizational Learning, Project Learning, and Project Success

    ERIC Educational Resources Information Center

    McKay, Donald S., II

    2012-01-01

    Knowledge gained from completed information technology (IT) projects was not often shared with emerging project teams. Learning lessons from other project teams was not pursued because people lack time, do not see value in learning, fear a potentially painful process, and had concerns that sharing knowledge will hurt their career. Leaders could…

  17. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  18. I-15 North Project

    DOT National Transportation Integrated Search

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  19. Project management process.

    DOT National Transportation Integrated Search

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  20. "Cheesy Pizza": The Pizza Project

    ERIC Educational Resources Information Center

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  1. Political polarization projection: social projection of partisan attitude extremity and attitudinal processes.

    PubMed

    Van Boven, Leaf; Judd, Charles M; Sherman, David K

    2012-07-01

    What influences perceptions of political polarization? The authors examine the polarization of people's own political attitudes as a source of perceived polarization: Individuals with more extreme partisan attitudes perceive greater polarization than individuals with less extreme partisan attitudes. This "polarization projection" was demonstrated in 3 studies in which people estimated the distribution of others' political attitudes: one study with a nationally representative sample concerning the 2008 presidential election, and 2 studies concerning university students evaluating a policy regarding scarce resource allocation. These studies demonstrate that polarization projection occurs simultaneously with and independently of simple projection, the tendency to assume that others share one's partisan political attitudes. Polarization projection may occur partly because people assume that others engage in similar attitudinal processes as the self, such as extensive thought and emotional arousal. The projection of various attitudinal processes was demonstrated in a study concerning health care reform policies. Further supporting this explanation, polarization projection increased when people introspected about their own attitudinal processes, which increased the accessibility of those processes. Implications for perceptions of partisanship, social judgment, and civic behavior are discussed.

  2. Proceedings of the National Forum of the Association of Independent Liberal Arts Colleges for Teacher Education (3rd, Indianapolis, Indiana, June 2-4, 1989).

    ERIC Educational Resources Information Center

    Carbone, Michael, Ed.

    The 13 papers contained in this document represent a selection of presentations from a national forum on teacher education which addressed empowerment and professionalization of teachers. The papers are: (1) "Imagining Preservice Teachers" (Alison Brennan, M. Serra Goethals, Rose Howard); (2) "Corsini 4R Schools Empower…

  3. Statistical Smoothing Methods and Image Analysis

    DTIC Science & Technology

    1988-12-01

    83 - 111. Rosenfeld, A. and Kak, A.C. (1982). Digital Picture Processing. Academic Press,Qrlando. Serra, J. (1982). Image Analysis and Mat hematical ...hypothesis testing. IEEE Trans. Med. Imaging, MI-6, 313-319. Wicksell, S.D. (1925) The corpuscle problem. A mathematical study of a biometric problem

  4. Elective Program Projects

    ERIC Educational Resources Information Center

    Estrada, Christelle

    1976-01-01

    Outlined is an interdisciplinary program in Ecology and Oceanography for grades six through eight. Numerous student projects are suggested in the outline and the course requirements and the project system are explained. (MA)

  5. Supernova Cosmology Project

    Science.gov Websites

    , 2014 The Supernova Cosmology Project and High-Z Team share the 2015 Breakthrough Prize in Fundamental Perlmutter, leader of the international Supernova Cosmology Project, and principal investigator of the

  6. Project management practice and its effects on project success in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  7. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  8. Native American Projects and Projects Recruiting Native Americans: FY 91, FY 92, FY 93.

    ERIC Educational Resources Information Center

    Baker, Betty C.

    This document presents descriptions of projects supported by the U.S. Department of Education's Division of Personnel Preparation which prepare Native Americans to serve students with disabilities. Two types of projects are included in this listing: Native American Projects (funded for fiscal years 1991, 1992, and 1993) and Projects Recruiting…

  9. Project LITE Spectroscopy

    NASA Astrophysics Data System (ADS)

    Weeks, E.; Brecher, K.; Carr, P.; Garik, P.

    2003-12-01

    Spectroscopy is one of the most important tools used by astronomers to disentangle information about the universe. However, it is one of the most challenging subjects in undergraduate astronomy courses. Among the most difficult concepts for students to master are Kirchhoff's laws, blackbody radiation, the Stefan-Boltzmann law, Wien's law, the nature and causes of emission and absorption lines, and the relation of spectra to the underlying astronomical and physical processes producing them. Students often seem baffled by the connection between a spectrum seen visually as a color band and the same spectrum plotted graphically as intensity versus wavelength or frequency. Project LITE (Light Inquiry Through Experiments) is a software, curriculum, and materials development project at Boston University. As part of the project, we are currently developing a suite of spectroscopic tools for astronomy education. We are also assessing their effectiveness in improving conceptual understanding of spectroscopic phenomena by astronomy students at the undergraduate level. The spectroscopy component of Project LITE includes take-home laboratory materials and experiments, which are integrated with web-based software. We have also developed a novel quantitative handheld binocular spectrometer (patent pending). Here we present an overview of the Project LITE homelab kits and curriculum, the Spectrum Explorer, and the Project LITE spectrometer. The homelab experiments and the Spectrum Explorer have been tested with students in a non-science majors introductory astronomy course as well as in a School of Education course for prospective elementary school science teachers. We present preliminary results of pre- and post-instruction surveys of student understanding of various spectral properties of light both from students who used the homelab activities and the Spectrum Explorer and those who did not. The Spectrum Explorer (along with many other applets about both the physical and

  10. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  11. The Alzheimer's Project

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  12. Project development process.

    DOT National Transportation Integrated Search

    2007-08-01

    The following chapter explains the purpose of this document, outlines the essential elements involved in : the Project Development Process, describes the differences in the three main project classifications, and : provides the necessary background i...

  13. Project resource reallocation algorithm

    NASA Technical Reports Server (NTRS)

    Myers, J. E.

    1981-01-01

    A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.

  14. THE ATLANTA SUPERSITE PROJECT

    EPA Science Inventory

    The Atlanta Supersites project is the first of two Supersites projects to be established during Phase I of EPA's Supersites Program; Phase 11 is being established through a Request for Assistance. The other initial project is in Fresno, California. The Supersites Program is par...

  15. Library Digitisation Project Management.

    ERIC Educational Resources Information Center

    Middleton, Michael

    Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and…

  16. Characterization of wines according the geographical origin by analysis of isotopes and minerals and the influence of harvest on the isotope values.

    PubMed

    Dutra, S V; Adami, L; Marcon, A R; Carnieli, G J; Roani, C A; Spinelli, F R; Leonardelli, S; Vanderlinde, R

    2013-12-01

    We studied Brazilian wines produced by microvinification from Cabernet Sauvignon and Merlot grapes, vintages 2007 and 2008, from the Serra Gaúcha, Campanha and Serra do Sudeste regions, in order to differentiate them according to geographical origin by using isotope and mineral element analyses. In addition, the influence of vintage production in isotope values was verified. Isotope analysis was performed by isotope ratio mass spectrometry (IRMS), and the determination of minerals was by flame atomic absorption (FAA). The best parameters to classify the wines in the 2008 vintage were Rb and Li. The results of the δ(13)C of wine ethanol, Rb and Li showed a significant difference between the varieties regardless of the region studied. The δ(18)O values of water and δ(13)C of ethanol showed significant differences, regardless of the variety. Discriminant analysis of isotope and minerals values allowed to classify approximately 80% of the wines from the three regions studied. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Sandy beach molluscs as possible bio-indicators of metal pollution 1. field survey. [South Africa

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watling, H.R.; Watling, R.J.

    A great variety of molluscs occur around the South African coast, extending as it does from the sub-tropical environment of Natal to the temperate environment of the Cape. The potential of many of these molluscs as bio-indicators has been discussed in general terms on the basis of the reported use of related species (DARRACOTT and WATLING 1975) and certain of these, among them the bivalve Donax serra and gastropod Bullia rhodostoma, have been included in the national marine pollution monitoring program. The aims of this preliminary investigation are: to determine the metal concentrations in D. serra and B. rhodostoma growingmore » along a 500 km stretch of the southern African coast, supplementing data from sediment and water sampling surveys of the same region; and to determine in laboratory studies whether these molluscs accumulate metals, thus meeting some at least of the criteria for monitoring organisms. The field survey data are presented in this paper.« less

  18. From the Guiana Highlands to the Brazilian Atlantic Rain Forest: four new species of Selaginella (Selaginellaceae – Lycopodiophyta: S. agioneuma, S. magnafornensis, S. ventricosa, and S. zartmanii)

    PubMed Central

    López, Christian A.; Sierra, Adriel M.; Ceballos, Jorge

    2018-01-01

    We describe four new species in the genus Selaginella (i.e., S. agioneuma, S. magnafornensis, S. ventricosa, and S. zartmanii) from Brazil, all presently classified in subg. Stachygynandrum. For each of the new taxa we discuss taxonomic affinities and provide information on habitat, distribution, and conservation status. In addition, line drawings and scanning electron microscope (SEM) images of stems sections, leaves, and spores (when present) are included. Selaginella agioneuma and S. magnafornensis are from the State of Espíritu Santo where they inhabit premontane to montane Atlantic rain forests in the Reserva Biológica Augusto Ruschi and Parque Estadual Forno Grande, respectively. Selaginella ventricosa was collected in upper montane forests at Parque Nacional Serra da Mocidade, State of Roraima and S. zartmanii in premontane Amazon rain forests on upper Rio Negro at Mpio. São Gabriel da Cachoeira, Amazonas State in both Serra Curicuriari and the Morro dos Seis Lagos Biological Reserve. PMID:29770272

  19. Comments on "extended zonal dislocations mediating ? ? twinning in titanium"

    NASA Astrophysics Data System (ADS)

    El Kadiri, Haitham; Barrett, Christopher D.

    2013-09-01

    In a recent paper, Li et al. (Philos. Mag. 92 (2012) p.1006) used results of atomistic simulations to advance a growth mechanism of ? ? twinning in titanium based on the concept of two elementary twinning dislocations which nucleate and glide in pairs but separately and sequentially on two neighbouring planes. This new Comment was stimulated after A. Serra, D.J. Bacon and R.C. Pond privately raised concerns on this growth model to one of the present authors, H. El Kadiri, who This was a co-author of the original paper (Philos. Mag. 92 (2012) p.1006). We repeated the simulations and obtained nearly the same simulations results as Li et al. However, after re-analysing these results, we have concluded that the extended extrinsic zonal dislocation mechanism claimed to be that for twin growth in titanium is in fact false, confirming the accuracy of the Comment by Serra et al that results of Li and co-authors were misinterpreted.

  20. Landslides Zonation Hazard: relation between geological structures and landslides occurrence in hilly tropical regions of Brazil.

    PubMed

    Cerri, Rodrigo I; Reis, Fábio A G V; Gramani, Marcelo F; Giordano, Lucilia C; Zaine, José Eduardo

    2017-01-01

    This paper presents a new approach of landslides zonation hazard studies, based on an integrated study of structural data along with geomorphological and external factors, in a hilly regions of Brazil, covered by a tropical humid rain-forest, called Serra do Mar. The Serra do Mar consists of a hilly region along the east coast of Brazil, with high slopes and many geological structures in a gneiss - migmatitic terrain. In contrast to traditional approaches, this method proposes that structural data (foliation, fractures and bedding planes) and its relation with the slope geometry, is important to be consider in the landslide zonation hazard, along with declivity, relative relief, soil and rock properties, land use and vegetation cover and hydrogeological and climate factors. Results show that slopes with high hazard have the same dip direction of geological structures. Landslide zonation hazard using structural data contributes to a better understanding of how these structures, preserved in tropical residual soils, influence on slope stability and generates landslides.

  1. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  2. Optimal mapping of terrestrial gamma dose rates using geological parent material and aerogeophysical survey data.

    PubMed

    Rawlins, B G; Scheib, C; Tyler, A N; Beamish, D

    2012-12-01

    Regulatory authorities need ways to estimate natural terrestrial gamma radiation dose rates (nGy h⁻¹) across the landscape accurately, to assess its potential deleterious health effects. The primary method for estimating outdoor dose rate is to use an in situ detector supported 1 m above the ground, but such measurements are costly and cannot capture the landscape-scale variation in dose rates which are associated with changes in soil and parent material mineralogy. We investigate the potential for improving estimates of terrestrial gamma dose rates across Northern Ireland (13,542 km²) using measurements from 168 sites and two sources of ancillary data: (i) a map based on a simplified classification of soil parent material, and (ii) dose estimates from a national-scale, airborne radiometric survey. We used the linear mixed modelling framework in which the two ancillary variables were included in separate models as fixed effects, plus a correlation structure which captures the spatially correlated variance component. We used a cross-validation procedure to determine the magnitude of the prediction errors for the different models. We removed a random subset of 10 terrestrial measurements and formed the model from the remainder (n = 158), and then used the model to predict values at the other 10 sites. We repeated this procedure 50 times. The measurements of terrestrial dose vary between 1 and 103 (nGy h⁻¹). The median absolute model prediction errors (nGy h⁻¹) for the three models declined in the following order: no ancillary data (10.8) > simple geological classification (8.3) > airborne radiometric dose (5.4) as a single fixed effect. Estimates of airborne radiometric gamma dose rate can significantly improve the spatial prediction of terrestrial dose rate.

  3. Project management; considerations for success.

    PubMed

    Maas, Jos

    2013-01-01

    During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues.

  4. Forest Residues Bundling Project

    Treesearch

    U.S. Forest Service

    2007-01-01

    During the summer of 2003, the U.S. Forest Service conducted an evaluation of biomass bundling for forest residue extraction. This CD provides a report of the project results, a video documentary project record, and a collection of images from the project. Additional information is available at:

  5. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  6. CHP Project Development

    EPA Pesticide Factsheets

    Access information and tools to support the CHP project development process, including identifying if your facility is a good fit for CHP, the steps involved with CHP project development, and policies and incentives supportive of CHP.

  7. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    NASA Astrophysics Data System (ADS)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  8. Subcollicular projections to the auditory thalamus and collateral projections to the inferior colliculus.

    PubMed

    Schofield, Brett R; Mellott, Jeffrey G; Motts, Susan D

    2014-01-01

    Experiments in several species have identified direct projections to the medial geniculate nucleus (MG) from cells in subcollicular auditory nuclei. Moreover, many cochlear nucleus cells that project to the MG send collateral projections to the inferior colliculus (IC) (Schofield et al., 2014). We conducted three experiments to characterize projections to the MG from the superior olivary and the lateral lemniscal regions in guinea pigs. For experiment 1, we made large injections of retrograde tracer into the MG. Labeled cells were most numerous in the superior paraolivary nucleus, ventral nucleus of the trapezoid body, lateral superior olivary nucleus, ventral nucleus of the lateral lemniscus, ventrolateral tegmental nucleus, paralemniscal region and sagulum. Additional sources include other periolivary nuclei and the medial superior olivary nucleus. The projections are bilateral with an ipsilateral dominance (66%). For experiment 2, we injected tracer into individual MG subdivisions. The results show that the subcollicular projections terminate primarily in the medial MG, with the dorsal MG a secondary target. The variety of projecting nuclei suggest a range of functions, including monaural and binaural aspects of hearing. These direct projections could provide the thalamus with some of the earliest (i.e., fastest) information regarding acoustic stimuli. For experiment 3, we made large injections of different retrograde tracers into one MG and the homolateral IC to identify cells that project to both targets. Such cells were numerous and distributed across many of the nuclei listed above, mostly ipsilateral to the injections. The prominence of the collateral projections suggests that the same information is delivered to both the IC and the MG, or perhaps that a common signal is being delivered as a preparatory indicator or temporal reference point. The results are discussed from functional and evolutionary perspectives.

  9. Subcollicular projections to the auditory thalamus and collateral projections to the inferior colliculus

    PubMed Central

    Schofield, Brett R.; Mellott, Jeffrey G.; Motts, Susan D.

    2014-01-01

    Experiments in several species have identified direct projections to the medial geniculate nucleus (MG) from cells in subcollicular auditory nuclei. Moreover, many cochlear nucleus cells that project to the MG send collateral projections to the inferior colliculus (IC) (Schofield et al., 2014). We conducted three experiments to characterize projections to the MG from the superior olivary and the lateral lemniscal regions in guinea pigs. For experiment 1, we made large injections of retrograde tracer into the MG. Labeled cells were most numerous in the superior paraolivary nucleus, ventral nucleus of the trapezoid body, lateral superior olivary nucleus, ventral nucleus of the lateral lemniscus, ventrolateral tegmental nucleus, paralemniscal region and sagulum. Additional sources include other periolivary nuclei and the medial superior olivary nucleus. The projections are bilateral with an ipsilateral dominance (66%). For experiment 2, we injected tracer into individual MG subdivisions. The results show that the subcollicular projections terminate primarily in the medial MG, with the dorsal MG a secondary target. The variety of projecting nuclei suggest a range of functions, including monaural and binaural aspects of hearing. These direct projections could provide the thalamus with some of the earliest (i.e., fastest) information regarding acoustic stimuli. For experiment 3, we made large injections of different retrograde tracers into one MG and the homolateral IC to identify cells that project to both targets. Such cells were numerous and distributed across many of the nuclei listed above, mostly ipsilateral to the injections. The prominence of the collateral projections suggests that the same information is delivered to both the IC and the MG, or perhaps that a common signal is being delivered as a preparatory indicator or temporal reference point. The results are discussed from functional and evolutionary perspectives. PMID:25100950

  10. Visible Human Project

    MedlinePlus

    ... used for teaching, modeling radiation absorption and therapy, equipment design, surgical simulation, and simulation of diagnostic procedures, ….” ... Project ® " by Michael J. Ackerman, Ph.D. Projects Based on the Visible Human Data Set Applications for ...

  11. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lear, Jon; Bennett, Carlon; Lear, Dan

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator -more » Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.« less

  12. Science project

    NASA Image and Video Library

    2012-08-23

    Once tethered in place in Gulf Coast waters, a DRIFTER sensor device is able to transmit valuable information about water temperature and conductivity. The Applied Science and Technology Project Office at Stennis Space Center designed the DRIFTER as an inexpensive device that can be used for science projects in local schools. Two of the devices, deployed in coastal waters, survived Hurricane Isaac, continuing to transmit valuable data regarding the storm.

  13. Humane Education Projects Handbook.

    ERIC Educational Resources Information Center

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  14. Concentrating Solar Power Projects by Project Name | Concentrating Solar

    Science.gov Websites

    Tower Plant Gujarat Solar One Gulang 100MW Thermal Oil Parabolic Trough project Guzmán Hami 50 MW CSP ¼lich Solar Tower Kathu Solar Park KaXu Solar One Khi Solar One Kimberlina Solar Thermal Power Plant Solar Plant MINOS Mojave Solar Project Morón National Solar Thermal Power Facility Nevada Solar One

  15. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate conveyance. Project-related planning costs outlined in § 64.9(a)(3), may be incurred prior to...) Construction costs associated with developing the right-of-way for recreation use. (3) Project-related planning required for the acquisition, development and use of the abandoned rights-of-way including master planning...

  16. Guidelines for CSM project development.

    PubMed

    1983-01-01

    This document summarizes guidelines for contraceptive social marketing project development prepared by the International Contraceptive Social Marketing Project (ICSMP) as an aid to consultants and technical assistance contractors. The ICSMP has developed a checklist to guide planning in 4 major areas: 1) project organization and management structure, 2) target market, 3) product line, and 4) pricing strategy and project costs. A clear statement of project objectives is essential, and these objectives must be internally consistent so that strategies to accomplish them can be unified. The position of each governmental entity and sponsoring agency involved in the social marketing project must be clearly understood. Projects receiving US government funds must have a mechanism for financial and programmatic reporting and accountability. Thorough knowledge of commercial rules and regulations in a country is necessary for planning. To ascertain whether the necessary resources are available, it is necessary to examine the existing marketing infrastructure in terms of distribution, advertising, market research, and packagaing capabilities. The target market should be specified in quantifiable terms; in addition, a consumer profile that defines the overall demographics of the country, the family planning environment, and potential social marketing consumers should be developed. The couple years of protection projection can be translated into the percentage of the target market that the project expects to capture. It is necessary to price products early in project development in order to assess program costs. Revenue projections should be based on previous calculations of couple year of protection goals, product line, product price, and price structure. Each element of the advertsing budget should be justifiable in terms of project objectives. Finally, positions and anticpated salaries for staff should be specified through the 1st 3 years of project implementation.

  17. Tedese Project

    NASA Astrophysics Data System (ADS)

    Buforn, E.; Davila, J. Martin; Bock, G.; Pazos, A.; Udias, A.; Hanka, W.

    The TEDESE (Terremotos y Deformacion Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cadiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnologia with the participation of the GeoforschungZen- trum, Potsdam (GFZ). The aim is to carry out a study of the characteristics of the oc- currence and mechanism of earthquakes together with measurements of crustal struc- ture and deformations in order to obtain an integrated evaluation of seismic risk in southern Spain from. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed in southern Spain and northern Africa for one year beginning in October 2001. The objectives of the project are the study in detail of the focal mechanisms of earthquakes in this area, of structural in crust and upper mantle, of seismic anisotropy in crust and mantle as indicator for tectonic deformation processed and the measure- ments of crustal deformations using techniques with permanent GPS and SLR stations and temporary GPS surveys. From these studies, seismotectonic models and maps will be elaborated and seismic risk in the zone will be evaluated.

  18. Michigan: Healthy Homes-Healthy Business Project (A Former EPA CARE Project)

    EPA Pesticide Factsheets

    The Healthy Homes-Healthy Business project is a recipient of a Level II CARE cooperative agreement. The communities of focus for this CARE level II project are the adjacent neighborhoods of Southwest Detroit and South Dearborn.

  19. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  20. Project coalitions in healthcare construction projects and the application of real options: an exploratory survey.

    PubMed

    van Reedt Dortland, Maartje; Dewulf, Geert; Voordijk, Hans

    2013-01-01

    Exploring the impact of the type of project coalition on types of flexibility by analyzing considered and exercised flexibilities in separated and integrated project coalitions in the design and construction phase and the operations and maintenance phase of a healthcare construction project. Flexibility in healthcare construction projects is increasingly needed in order to deal with growing uncertainties. Until now, little research has been carried out on how and to what extent flexibility is incorporated in different types of project coalitions chosen by healthcare organizations. An exploratory survey was conducted among health organizations in both cure and care. Questions were asked on the position of the real estate department within the organization, the type of project coalitions chosen and the rationale behind this choice, and the extent to which flexibility in terms of a real option was considered and to what extent it had been exercised in a project coalition. Integrated project coalitions pay more attention to flexibility in advance in both the process and the product, but exercise them to a lesser extent than separated project coalitions. The economic feasibility of real options is higher in integrated project coalitions. The study shows that real options thinking is already incorporated in real estate management of healthcare organizations, although more flexibility is considered in advance of the project than is actually realized during and after construction. Built environment, construction, decision making, hospitals, planning.

  1. Project-Based Module Development.

    ERIC Educational Resources Information Center

    Meel, R. M. van

    A project management design for modularizing higher education at open universities was developed and tested. Literature in the fields of project management and development of modular curriculum materials was reviewed and used as a basis for developing a project-based approach to the process of developing modules for self-instruction. According to…

  2. 27 CFR 9.98 - Monterey.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... TREASURY ALCOHOL AMERICAN VITICULTURAL AREAS Approved American Viticultural Areas § 9.98 Monterey. (a) Name... maps in the 7.5 minute series, as follows: (1) Sycamore Flat, CA, 1956, photoinspected 1972; (2) Junipero Serra Peak, CA, 1949, photoinspected 1972; (3) Reliz Canyon, CA, 1949; (4) Paraiso Springs, CA...

  3. 2. Historic American Buildings Survey Copy by Bert Shankland, Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Historic American Buildings Survey Copy by Bert Shankland, Photographer August 20, 1974 EAST AND SOUTH ELEVATION AFTER ADDITION OF PORCH, ALTERATION OF WINDOWS Fromthe Collection of the San Diego Historical Society, Serra Museum, San Diego - Temple Beth Israel, 1502 Second Avenue, San Diego, San Diego County, CA

  4. Lake Charles CCS Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leib, Thomas; Cole, Dan

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor

  5. 13 CFR 308.1 - Use of funds in Projects constructed under projected cost.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...

  6. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  7. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  8. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  9. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  10. Le management des projets scientifiques

    NASA Astrophysics Data System (ADS)

    Perrier, Françoise

    2000-12-01

    We describe in this paper a new approach for the management of scientific projects. This approach is the result of a long reflexion carried out within the MQDP (Methodology and Quality in the Project Development) group of INSU-CNRS, and continued with Guy Serra. Our reflexion was initiated with the study of the so-called `North-American Paradigm' which was, initially considered as the only relevant management model. Through our active participation in several astrophysical projects we realized that this model could not be applied to our laboratories without major modifications. Therefore, step-by-step, we have constructed our own methodology, using to the fullest human potential resources existing in our research field, their habits and skills. We have also participated in various working groups in industrial and scientific organisms for the benefits of CNRS. The management model presented here is based on a systemic and complex approach. This approach lets us describe the multiple aspects of a scientific project specially taking into account the human dimension. The project system model includes three major interconnected systems, immersed within an influencing and influenced environment: the `System to be Realized' which defines scientific and technical tasks leading to the scientific goals, the `Realizing System' which describes procedures, processes and organization, and the `Actors' System' which implements and boosts all the processes. Each one exists only through a series of successive models, elaborated at predefined dates of the project called `key-points'. These systems evolve with time and under often-unpredictable circumstances and the models have to take it into account. At these key-points, each model is compared to reality and the difference between the predicted and realized tasks is evaluated in order to define the data for the next model. This model can be applied to any kind of projects.

  11. The Eggen Card Project

    NASA Astrophysics Data System (ADS)

    Silvis, G.

    2014-06-01

    (Abstract only) Olin Eggen, noted astronomer (1919-1998), left to us all his raw observation records recorded on 3x5 cards. This project is to make all this data available as an online resource. History and progress of the project will be presented. Project details available at: https://sites.google.com/site/eggencards/home.

  12. Project Pride Evaluation Report.

    ERIC Educational Resources Information Center

    Jennewein, Marilyn; And Others

    Project PRIDE (Probe, Research, Inquire, Discover, and Evaluate) is evaluated in this report to provide data to be used as a learning tool for project staff and student participants. Major objectives of the project are to provide an inter-disciplinary, objective approach to the study of the American heritage, and to incorporate methods and…

  13. Panoramic projection avionics displays

    NASA Astrophysics Data System (ADS)

    Kalmanash, Michael H.

    2003-09-01

    Avionics projection displays are entering production in advanced tactical aircraft. Early adopters of this technology in the avionics community used projection displays to replace or upgrade earlier units incorporating direct-view CRT or AMLCD devices. Typical motivation for these upgrades were the alleviation of performance, cost and display device availability concerns. In these systems, the upgraded (projection) displays were one-for-one form / fit replacements for the earlier units. As projection technology has matured, this situation has begun to evolve. The Lockheed-Martin F-35 is the first program in which the cockpit has been specifically designed to take advantage of one of the more unique capabilities of rear projection display technology, namely the ability to replace multiple small screens with a single large conformal viewing surface in the form of a panoramic display. Other programs are expected to follow, since the panoramic formats enable increased mission effectiveness, reduced cost and greater information transfer to the pilot. Some of the advantages and technical challenges associated with panoramic projection displays for avionics applications are described below.

  14. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giordano, Anthony P.

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  15. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  16. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  17. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  18. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  19. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  20. Single Parent/Homemaker Project Reports.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Education, Frankfort. Office of Vocational Education.

    Annual reports, project descriptions, and various other materials are provided for 35 projects. Most of the projects focus on homemaking; some are on sex equity. Project titles include: Single Parent/Adult Homemaker Reentry Program (Ashland Community College); Career Awareness Class for the Single Parent and/or Homemaker (Cumberland Valley Health…

  1. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  2. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  3. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  4. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  5. Long term atmospheric aerosol characterization in the Amazon Basin

    NASA Astrophysics Data System (ADS)

    Artaxo, Paulo; Gerab, Fábio; Yamasoe, Marcia A.

    This chapter presents a characterization of atmospheric aerosols collected in different places in the Amazon Basin. Both the biogenic aerosol emission from the forest and the particulate material which is emitted to the atmosphere due to the large scale man-made burns during the dry season were studied. The samples were collected during a three year period at three different locations in the Amazon (Cuiabá, Alta Floresta and Serra do Navio), using stacked filter units. Aerosol samples were also collected directly over fires of cerrado vegetation and tropical primary forest burns The samples were analyzed using several techniques for a number of elements. Gravimetric analyses were used to determine the total atmospheric aerosol concentration. Multivariate statistical analysis was used in order to identify and characterize the sources of the atmospheric aerosol present in the sampled regions. Cerrado burning emissions were enriched compared to forest ones, specially for Cl, K and Zn. High atmospheric aerosol concentrations were observed in large amazonian areas due to emissions from man-made burns in the period from June to September. The emissions from burns dominate the fine fraction of the atmospheric aerosol with characteristic high contents of black carbon, S and K. Aerosols emitted in biomass burning process are correlated to the increase in the aerosol optical thickness of the atmosphere during the Amazonian dry season. The Serra do Navio aerosol is characterized by biogenic emissions with strong marine influence. The presence of trace elements characteristic of soil particulate associated with this marine contribution indicates the existence of aerosol transport from Africa to South America. Similar composition characteristics were observed in the biogenic emission aerosols from Serra do Navio and Alta Floresta.

  6. The Sungrazer Citizen Science Project

    NASA Astrophysics Data System (ADS)

    Battams, K.

    2016-12-01

    The NASA-funded Sungrazer Project is one of the oldest and most successful Citizen Science projects, having more than doubled the number of officially designated comets since it became public in 2002. The Sungrazer Project has enabled the discovery of more than 3,100 previously unknown near-Sun and Sungrazing comets in images returned by the joint ESA-NASA Solar and Heliospheric Observatory (SOHO), which was launched in 1995, and the NASA Solar Terrestrial Relations Observatories (STEREO), launched in 2006. The Sungrazer Project offers a centralized web site for amateur astronomers ("comet hunters") to report potential comets in SOHO and STEREO data, which the Project PI then confirms/rejects. It is then the task of the Project PI to perform precise astrometric measurements of all new comets, and supply the resulting data to the Minor Planet Center for official orbit determinations and designation. Almost 100 individuals from all over the world have discovered comets via the Project, with successful participants as young as 13-years old. In this talk I will discuss the history of the project, report the current discovery statistics, and highlight a few of the major discoveries enabled by the Project. I will also discuss the logistic of the program, participation requirements, day-to-day operations, and outreach efforts. Finally I will present an outlook for the project with respect to future space-based heliophysics missions.

  7. Project S'COOL

    NASA Technical Reports Server (NTRS)

    Green, Carolyn J.; Chambers, Lin H.

    1998-01-01

    The Students Clouds Observations On-Line or S'COOL project was piloted in 1997. It was created with the idea of using students to serve as one component of the validation for the Clouds and the Earth's Radiant Energy System (CERES) instrument which was launched with the Tropical Rainfall Measuring Mission (TRMM) in November, 1997. As part of NASA's Earth Science Enterprise CERES is interested in the role clouds play in regulating our climate. Over thirty schools became involved in the initial thrust of the project. The CERES instrument detects the location of clouds and identifies their physical properties. S'COOL students coordinate their ground truth observations with the exact overpass of the satellite at their location. Their findings regarding cloud type, height, fraction and opacity as well as surface conditions are then reported to the NASA Langley Distributed Active Archive Center (DAAC). The data is then accessible to both the CERES team for validation and to schools for educational application via the Internet. By March of 1998 ninety-three schools, in nine countries had enrolled in the S'COOL project. Joining the United States participants were from schools in Australia, Canada, France, Germany, Norway, Spain, Sweden, and Switzerland. The project is gradually becoming the global project envisioned by the project s creators. As students obtain the requested data useful for the scientists, it was hoped that students with guidance from their instructors would have opportunity and motivation to learn more about clouds and atmospheric science as well.

  8. Managemant of NASA's major projects

    NASA Technical Reports Server (NTRS)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  9. 20% Research & Design Science Project

    NASA Astrophysics Data System (ADS)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  10. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  11. Submittal for 2003 Project of the Year K Basins Fuel Transfer System Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GERBER, M.S.

    2003-01-29

    Fluor Hanford, Inc. is pleased to submit the K Basins Fuel Transfer System (FTS) for consideration by the Project Management Institute as Project of the Year for 2003. The FTS involved installing a unique, unproven system in an inhospitable and deteriorating radiological and hazardous environment, under very stringent requirements and within an extremely condensed schedule, just 19 months, from authorization to full operations. The FTS, therefore, is an excellent example of effective project management, and the dynamic involvement of an integrated team representing a broad spectrum of personnel, disciplines, and services. The FTS is an integral and critical part ofmore » a larger project at Hanford -the Spent Nuclear Fuel Project (SNF). The mission of the SNF Project is to relocate used, or spent, nuclear fuel to safe interim storage, permanently dispose of radioactive debris in the K-Basins, and deactivate all related facilities and prepare them for demolition. Today, the FTS is being used to remove highly radioactive nuclear fuel from an aging, and potentially unstable storage in underground pools of water--the K-Basins--and safely transport it to a processing area to be cleaned, dried and sent to safe storage. The role the FTS plays in successfully completing the mission of the SNF Project is concrete evidence of the intrinsic value of project management and a testimonial to the innovation, ingenuity, and teamwork of many--from workers to management and subcontractors, and regulators to stakeholders. It's a true success story and one that will have a happy ending, safely eliminating the risk of potentially contaminating one of Washington state's most valuable natural resources, the Columbia River. This nomination is dedicated to that Project Team.« less

  12. Health Project Management. A Manual of Procedures for Formulating and Implementing Health Projects.

    ERIC Educational Resources Information Center

    Bainbridge, J.; Sapirie, S.

    The manual presents 16 main steps for health project management, from project formulation through termination. The manual defines a health project as a temporary intensive effort to set up and put into operation a new or revised service that will result in the reduction of specific health or health-related problems. (Typical examples include the…

  13. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  14. An Empirical Investigation of Pre-Project Partnering Activities on Project Performance in the Software Industry

    ERIC Educational Resources Information Center

    Proffitt, Curtis K.

    2012-01-01

    Project failure remains a challenge within the software development field especially during the early stages of the IT project development. Despite the herculean efforts by project managers and organizations to identify and offset problems, projects remain plagued with issues. If these challenges are not mitigated, to a successful degree,…

  15. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  16. The Interdisciplinary Generalist Curriculum Project: A National Medical School Demonstration Project.

    ERIC Educational Resources Information Center

    Kahn, Norman B., Jr.; And Others

    1995-01-01

    The Interdisciplinary Generalist Curriculum Project was developed to encourage schools of medicine and colleges of osteopathic medicine to implement interdisciplinary generalist curricula in the preclinical years. Five sites were competitively established as demonstration projects, and rigorous attention to creating and maintaining an…

  17. The TULIP Project.

    ERIC Educational Resources Information Center

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  18. BI Project Success

    ERIC Educational Resources Information Center

    Tracey, Graham; Riha, James

    2009-01-01

    Managing business intelligence (BI) projects in higher education is a formidable responsibility that challenges even the most experienced technical project managers. Data source dependencies, uncertain data quality, changing information requirements, and urgency for actionable information are but a few examples among the multitude of challenges.…

  19. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  20. IPAD project overview

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  1. MtDNA diversity among four Portuguese autochthonous dog breeds: a fine-scale characterisation

    PubMed Central

    van Asch, Barbara; Pereira, Luísa; Pereira, Filipe; Santa-Rita, Pedro; Lima, Manuela; Amorim, António

    2005-01-01

    Background The picture of dog mtDNA diversity, as obtained from geographically wide samplings but from a small number of individuals per region or breed, has revealed weak geographic correlation and high degree of haplotype sharing between very distant breeds. We aimed at a more detailed picture through extensive sampling (n = 143) of four Portuguese autochthonous breeds – Castro Laboreiro Dog, Serra da Estrela Mountain Dog, Portuguese Sheepdog and Azores Cattle Dog-and comparatively reanalysing published worldwide data. Results Fifteen haplotypes belonging to four major haplogroups were found in these breeds, of which five are newly reported. The Castro Laboreiro Dog presented a 95% frequency of a new A haplotype, while all other breeds contained a diverse pool of existing lineages. The Serra da Estrela Mountain Dog, the most heterogeneous of the four Portuguese breeds, shared haplotypes with the other mainland breeds, while Azores Cattle Dog shared no haplotypes with the other Portuguese breeds. A review of mtDNA haplotypes in dogs across the world revealed that: (a) breeds tend to display haplotypes belonging to different haplogroups; (b) haplogroup A is present in all breeds, and even uncommon haplogroups are highly dispersed among breeds and continental areas; (c) haplotype sharing between breeds of the same region is lower than between breeds of different regions and (d) genetic distances between breeds do not correlate with geography. Conclusion MtDNA haplotype sharing occurred between Serra da Estrela Mountain dogs (with putative origin in the centre of Portugal) and two breeds in the north and south of the country-with the Castro Laboreiro Dog (which behaves, at the mtDNA level, as a sub-sample of the Serra da Estrela Mountain Dog) and the southern Portuguese Sheepdog. In contrast, the Azores Cattle Dog did not share any haplotypes with the other Portuguese breeds, but with dogs sampled in Northern Europe. This suggested that the Azores Cattle Dog

  2. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  3. JPL Year 2000 Project. A Project Manager's Observations: Y2k

    NASA Technical Reports Server (NTRS)

    Mathison, Richard P. (Technical Monitor)

    1999-01-01

    This paper presents observations from a project manager on the Y2K problem. The topics include: 1) Agenda: 2) Scope; 3) Project Organization; 4) The Fixes; 5) The Toughest Part; 6) Validation versus Time; and 7) Information Sources. This paper is in viewgraph form.

  4. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  5. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11...

  6. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2012-10-01 2012-10-01 false Covered projects. 633.11 Section 633.11...

  7. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2013-10-01 2013-10-01 false Covered projects. 633.11 Section 633.11...

  8. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2014-10-01 2014-10-01 false Covered projects. 633.11 Section 633.11...

  9. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2011-10-01 2011-10-01 false Covered projects. 633.11 Section 633.11...

  10. Small Projects First

    ERIC Educational Resources Information Center

    Shang-Kuei, Chen

    1975-01-01

    For thousands of years China has been troubled by droughts and floods. In the past 25 years, the country has worked to alleviate these problems. Numerous water conservation projects requiring the communal efforts of the people have been carried out. Record grain crops have resulted from these projects. (MA)

  11. The Billboard Project

    ERIC Educational Resources Information Center

    Weaver, Victoria

    2005-01-01

    Since 1997, the author coordinated a large-scale billboard project. Coordinated to coincide with the National Art Education Association's celebration of Youth Art Month, strong commitments from faculty, students, administrators, public-relations liaisons, local press, radio, TV, and community businesses have made this project a success. The first…

  12. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  13. Brazilian Eratosthenes Project

    NASA Astrophysics Data System (ADS)

    Langhi, R.; Vilaça, J.

    2014-10-01

    The objective of Brazilian Eratosthenes Project is the development and application of teaching training actions according the ``docent autonomy" concept to basic Astronomy Education. Argentina coordinates the project in South America, but Brazil works in this project since 2010 with the theme ``Projeto Eratóstenes Brasil" in the homepage: http://sites.google.com/site/projetoerato. Two schools measure a sticks shadow and communicate their results. After, they calculate an average radius of Earth. The stick (gnomon) should stay in vertical position in the leveled ground. Since 2010, the project received hundreds of Brazilian schools with different experiments that were constructed with autonomy, because our site doesn't show some itinerary pre-ready to elaborate the experiments. To collect data for our research, we will use interviews via Skype with the teachers. These data are useful to researches about Science Education area and the Teaching Formation. Teaching professional practice could change and we see modifications in the teachers work, what depends of their realities and context. This project intents to respect the docent autonomy. This autonomy to responsible modifications during continued formation is called ``activist formative model" according Langhi & Nardi (Educação em Astronomia: repensando a formação de professores. São Paulo: Escrituras Editora, 2012). This project discusses about researches in Astronomy Education - still extreme rare in Brazil, when we compare with other areas in Science Education. We believe that actions like this could motivate the students to learn more Astronomy. Furthermore, this national action can be a rich source of data to investigations about teaching formation and scientific divulgation.

  14. Final project report for NEET pulsed ion beam project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kucheyev, S. O.

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurementmore » of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.« less

  15. The project scientist's role in scientific spacecraft project management. M.S. Thesis - George Washington Univ.

    NASA Technical Reports Server (NTRS)

    Eller, E. L.

    1976-01-01

    The project scientists is in a position which rates very high in terms of behavioral study recommendations. His influence over objectives is generally considered to be important. He is highly autonomous in a moderately coordinated environment. He has diverse managerial and technical functions and the performance of these functions require him to grow beyond his role as an experimenter. However, the position within the line organization for those interviewed is also very stimulating, rating almost as high by the same criteria. The role of project scientist may not be the dominant means of professional growth for the experienced scientific investigators. The influence which the project scientist exerts on the project and the stimulation of that position for him are determined largely by his position outside the defined project scientist role. The role of the project scientist is changing because the environment of those who become project scientists is changing.

  16. [The research project: financing and management].

    PubMed

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  17. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  18. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  19. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  20. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  1. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  2. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  3. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  4. The Anthological Project.

    ERIC Educational Resources Information Center

    Johns, Trevor

    1969-01-01

    Anthological projects, in which students gather and produce material for a group product (e.g., class newspapers, magazines, radio shows), can reawaken students' interest in English and benefit all ability levels. The novelty of the projects and the promise of tangible results initially motivates the students, and their involvement and the…

  5. Family Reunification Project.

    ERIC Educational Resources Information Center

    Administration for Children, Youth, and Families (DHHS), Washington, DC.

    Utah's Department of Human Services' Family Reunification Project was initiated to demonstrate that intensive, time-limited, home-based services would enable children in foster care to return to their natural families more rapidly than regular foster care management permits. The following steps were taken in project development: (1) sites were…

  6. Setting up crowd science projects.

    PubMed

    Scheliga, Kaja; Friesike, Sascha; Puschmann, Cornelius; Fecher, Benedikt

    2016-11-29

    Crowd science is scientific research that is conducted with the participation of volunteers who are not professional scientists. Thanks to the Internet and online platforms, project initiators can draw on a potentially large number of volunteers. This crowd can be involved to support data-rich or labour-intensive projects that would otherwise be unfeasible. So far, research on crowd science has mainly focused on analysing individual crowd science projects. In our research, we focus on the perspective of project initiators and explore how crowd science projects are set up. Based on multiple case study research, we discuss the objectives of crowd science projects and the strategies of their initiators for accessing volunteers. We also categorise the tasks allocated to volunteers and reflect on the issue of quality assurance as well as feedback mechanisms. With this article, we contribute to a better understanding of how crowd science projects are set up and how volunteers can contribute to science. We suggest that our findings are of practical relevance for initiators of crowd science projects, for science communication as well as for informed science policy making. © The Author(s) 2016.

  7. Computer-assisted map projection research

    USGS Publications Warehouse

    Snyder, John Parr

    1985-01-01

    Computers have opened up areas of map projection research which were previously too complicated to utilize, for example, using a least-squares fit to a very large number of points. One application has been in the efficient transfer of data between maps on different projections. While the transfer of moderate amounts of data is satisfactorily accomplished using the analytical map projection formulas, polynomials are more efficient for massive transfers. Suitable coefficients for the polynomials may be determined more easily for general cases using least squares instead of Taylor series. A second area of research is in the determination of a map projection fitting an unlabeled map, so that accurate data transfer can take place. The computer can test one projection after another, and include iteration where required. A third area is in the use of least squares to fit a map projection with optimum parameters to the region being mapped, so that distortion is minimized. This can be accomplished for standard conformal, equalarea, or other types of projections. Even less distortion can result if complex transformations of conformal projections are utilized. This bulletin describes several recent applications of these principles, as well as historical usage and background.

  8. Creating a Project-Based Learning Environment to Improve Project Management Skills of Graduate Students

    ERIC Educational Resources Information Center

    Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio

    2015-01-01

    This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.

  9. Sun light European Project

    NASA Astrophysics Data System (ADS)

    Soubielle, Marie-Laure

    2015-04-01

    2015 has been declared the year of light. Sunlight plays a major role in the world. From the sunbeams that heat our planet and feed our plants to the optical analysis of the sun or the modern use of sun particles in technologies, sunlight is everywhere and it is vital. This project aims to understand better the light of the Sun in a variety of fields. The experiments are carried out by students aged 15 to 20 in order to share their discoveries with Italian students from primary and secondary schools. The experiments will also be presented to a group of Danish students visiting our school in January. All experiments are carried out in English and involve teams of teachers. This project is 3 folds: part 1: Biological project = what are the mechanisms of photosynthesis? part 2: Optical project= what are the components of sunlight and how to use it? part 3: Technical project= how to use the energy of sunlight for modern devices? Photosynthesis project Biology and English Context:Photosynthesis is a process used by plants and other organisms to convert light energy, normally from the Sun, into chemical energy that can later fuel the organisms' activities. This chemical energy is stored in molecules which are synthesized from carbon dioxide and water. In most cases, oxygen is released as a waste product. Most plants perform photosynthesis. Photosynthesis maintains atmospheric oxygen levels and supplies all of the organic compounds and most of the energy necessary for life on Earth. Outcome: Our project consists in understanding the various steps of photosynthesis. Students will shoot a DVD of the experiments presenting the equipments required, the steps of the experiments and the results they have obtained for a better understanding of photosynthesis Digital pen project Electricity, Optics and English Context: Sunlight is a complex source of light based on white light that can be decomposed to explain light radiations or colours. This light is a precious source to create

  10. The ASTRI/CTA mini-array software system

    NASA Astrophysics Data System (ADS)

    Tosti, Gino; Schwarz, Joseph; Antonelli, Lucio Angelo; Trifoglio, Massimo; Catalano, Osvaldo; Maccarone, Maria Concetta; Leto, Giuseppe; Gianotti, Fulvio; Canestrari, Rodolfo; Giro, Enrico; Fiorini, Mauro; La Palombara, Nicola; Pareschi, Giovanni; Stringhetti, Luca; Vercellone, Stefano; Conforti, Vito; Tanci, Claudio; Bruno, Pietro; Grillo, Alessandro; Testa, Vincenzo; di Paola, Andrea; Gallozzi, Stefano

    2014-07-01

    ASTRI (Astrofisica con Specchi a Tecnologia Replicante Italiana) is a Flagship Project financed by the Italian Ministry of Education, University and Research, and led by INAF, the Italian National Institute of Astrophysics. The main goals of the ASTRI project are the realization of an end-to-end prototype of a Small Size Telescope (SST) for the Cherenkov Telescope Array (CTA) in a dual- mirror configuration (SST-2M) and, subsequently, of a mini-array comprising seven SST-2M telescopes. The mini-array will be placed at the final CTA Southern Site, which will be part of the CTA seed array, around which the whole CTA observatory will be developed. The Mini-Array Software System (MASS) will provide a comprehensive set of tools to prepare an observing proposal, to perform the observations specified therein (monitoring and controlling all the hardware components of each telescope), to analyze the acquired data online and to store/retrieve all the data products to/from the archive. Here we present the main features of the MASS and its first version, to be tested on the ASTRI SST-2M prototype that will be installed at the INAF observing station located at Serra La Nave on Mount Etna in Sicily.

  11. Developing Government Renewable Energy Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewablemore » projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.« less

  12. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  13. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...

  14. Geothermal Project Consulting | Geothermal Technologies | NREL

    Science.gov Websites

    Geothermal Project Consulting Geothermal Project Consulting When consulting on projects, NREL focuses on identifying specific barriers or challenges that are likely to impact geothermal project , validation, and deployment of geothermal technologies Assess and evaluate geothermal R&D projects

  15. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  16. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  17. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  18. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  19. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a...

  20. Project management: importance for diagnostic laboratories.

    PubMed

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  1. Share Your Solar Project Experience

    EPA Pesticide Factsheets

    The Local Government Solar Project Portal's Share Your Solar Project Experience page includes details on how municipalities can be listed in the Portal and update EPA with their solar project development achievements and progress.

  2. The Astronomy Genealogy Project

    NASA Astrophysics Data System (ADS)

    Tenn, Joseph S.

    2014-01-01

    The Astronomy Genealogy Project, to be known as AstroGen, will list as many as possible of the world's astronomers with their academic parents (aka thesis advisors) and enable the reader to trace both academic ancestors and descendants. It will be very similar to the highly successful Mathematics Genealogy Project (MGP), available at http://genealogy.math.ndsu.nodak.edu. The MGP, which has been in operation since 1996, now contains the names of about 170,000 "mathematicians." These include many physicists and astronomers, as well as practitioners of related sciences. Mitchel Keller, the director of the MGP, has generously shared the software used in that project, and the American Astronomical Society (AAS) will host AstroGen, a project of the Historical Astronomy Division, on its website. We expect to start seeking entries soon, depending on the availability of computational assistance from the AAS IT department. We are seeking volunteers to help run the project. If you are interested, please contact me at joe.tenn@sonoma.edu.

  3. The Rural Outreach Project

    NASA Technical Reports Server (NTRS)

    Coleman, Clarence D.

    2000-01-01

    The Rural Outreach Project was designed to increase the diversity of NASA's workforce by: 1) Conducting educational research designed to investigate the most effective strategies for expanding innovative, NASA-sponsored pre-college programs into rural areas; 2) Field-testing identified rural intervention strategies; 3) Implementing expanded NASA educational programs to include 300 rural students who are disabled, female and/or minority; and 4) Disseminating project strategies. The Project was a partnership that included NASA Langley Research Center's Office of Education, Norfolk State University, Cooperative Hampton Roads Organizations for Minorities in Engineering (CHROME) and Paul D. Camp Community College. There were four goals and activities identified for this project; 1) Ascertain effective strategies for expanding successful NASA-sponsored urban-based, pre-college programs into rural settings; 2) Field test identified rural intervention strategies; 3) Publish or disseminate two reports, concerning project research and activities at a national conference; 4) Provide educational outreach to 300, previously underserved, rural students who are disabled, female and /or minority.

  4. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  5. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  6. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  7. Life Skills Project

    ERIC Educational Resources Information Center

    Jalazo, Michael D.

    2005-01-01

    In this article, the author, Program Administrator of the Pinellas County Sheriff's Office (PCSO) Project New Attitudes in Clearwater, Florida, describes the project. The PCSO is the country's largest law enforcement agency, providing law enforcement services to over 400,000 of its residents who reside in the unincorporated areas of the county and…

  8. Computer Assets Recovery Project

    NASA Technical Reports Server (NTRS)

    CortesPena, Aida Yoguely

    2010-01-01

    This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.

  9. Solar Project Development Pathway & Resources

    EPA Pesticide Factsheets

    The Local Government Solar Project Portal's Solar Project Development Pathway and Resources page details the major steps along the project development pathway and each step includes resources and tools to assist you with that step.

  10. The Olive Project: An Oral History Project in Multiple Modes

    ERIC Educational Resources Information Center

    Anderson, Erin R.

    2011-01-01

    This project is devoted to the memory of my grandmother, Olive. It is at once her life story and not a story at all. In a sense it represents the product of an intimate family collaboration and of the close journey we shared in collecting and preserving her oral history. But this project is not a product, nor is it entirely about my grandma, about…

  11. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  12. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  13. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  14. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  15. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  16. Spiral and Project-Based Learning with Peer Assessment in a Computer Science Project Management Course

    NASA Astrophysics Data System (ADS)

    Jaime, Arturo; Blanco, José Miguel; Domínguez, César; Sánchez, Ana; Heras, Jónathan; Usandizaga, Imanol

    2016-06-01

    Different learning methods such as project-based learning, spiral learning and peer assessment have been implemented in science disciplines with different outcomes. This paper presents a proposal for a project management course in the context of a computer science degree. Our proposal combines three well-known methods: project-based learning, spiral learning and peer assessment. Namely, the course is articulated during a semester through the structured (progressive and incremental) development of a sequence of four projects, whose duration, scope and difficulty of management increase as the student gains theoretical and instrumental knowledge related to planning, monitoring and controlling projects. Moreover, the proposal is complemented using peer assessment. The proposal has already been implemented and validated for the last 3 years in two different universities. In the first year, project-based learning and spiral learning methods were combined. Such a combination was also employed in the other 2 years; but additionally, students had the opportunity to assess projects developed by university partners and by students of the other university. A total of 154 students have participated in the study. We obtain a gain in the quality of the subsequently projects derived from the spiral project-based learning. Moreover, this gain is significantly bigger when peer assessment is introduced. In addition, high-performance students take advantage of peer assessment from the first moment, whereas the improvement in poor-performance students is delayed.

  17. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    NASA Astrophysics Data System (ADS)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  18. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Randy M; Gross, Ian G; Smith, Cyrus M

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulnessmore » of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal

  19. Climate projections FAQ

    Treesearch

    A.E. Daniels; J.F. Morrison; L.A. Joyce; N.L. Crookston; S.C. Chen; S.G. McNulty

    2012-01-01

    Climate scenarios offer one way to identify and examine the land management challenges posed by climate change. Selecting projections, however, requires careful consideration of the natural resources under study, and where and how they are sensitive to climate. Selection also depends on the robustness of different projections for the resources and geographic area of...

  20. The Nordwrite Project.

    ERIC Educational Resources Information Center

    Evensen, Lars, Sigfred

    A planned 3-year joint project of the Nordic research council for the humanities that focuses on writing development in school-age children is described. Four Nordic countries are involved in the project: Finland, Sweden, Norway, and Denmark. In the study, discourse-level performance analyses of student writing in English as a Second Language are…

  1. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  2. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  3. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  4. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  5. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  6. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  7. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  8. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  9. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  10. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  11. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  12. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  13. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  14. [Administration of the "Healthy School" project].

    PubMed

    Bjegović, V; Zivković, M; Marinković, J; Vuković, D; Legetić, B

    1996-01-01

    The term of project management is commonly used to describe the work of a team that is handling a special program. In this type of management, a form of leadership which creates environment, enables fast movement of participants through different work phases achieving the common aims, is used [1-4]. The "Healthy School" Project, launched in almost all European countries, has been taking place in Yugoslavia since the end of 1991 [5]. The project developed within the country designed as a health promotion-education intervention study in primary schools. The network of 13 schools on 11 locations representing typical economic, cultural and social environments, was established to cover the country. Although the proposed methodological approach from WHO was followed [6], the specific situation in the country (economic crisis, break down of Yugoslav Federation, the war and international blockade) distated the particular modification. The management of the Healthy School Project in general, and in Yugoslavia particularly, is based upon project management structure (Scheme 1). The objective of this research was to assess the Healthy School project management in Yugoslavia, by measuring causal, intervening and output variables. In the process of assessing the management in general, three groups of criteria are commonly used: (a) causal (those that influence the course of developments in the Project), (b) intervening (representing the current condition of the internal state of the Project), and (c) output (that reflect the Project achievements). (a) For the purpose of this study the causal criteria were measured by analyzing the overall management strategy and the level of agreement in objectives of the Project itself, the Project Coordinators and main participants in the Project. (b) The intervening criteria used in this assessment were: the time spent on different project activities, the estimate of the severity of the problems in different aspects of project management

  15. The Eclipse Project

    NASA Technical Reports Server (NTRS)

    Tucker, Tom; Launius, Roger (Technical Monitor)

    2000-01-01

    The Eclipse Project by Tom Tucker provides a readable narrative and a number of documents that record an important flight research effort at NASA's Dryden Flight Research Center. Carried out by Kelly Space and Technology, Inc., in partnership with the Air Force and Dryden at Edwards Air Force Base in the Mojave Desert of California, this project tested and gathered data about a potential newer and less expensive way to launch satellites into space. Whether the new technology comes into actual use will depend on funding, market forces, and other factors at least partly beyond the control of the participants in the project. This is a familiar situation in the history of flight research.

  16. Spectrum Project

    NASA Image and Video Library

    2017-10-16

    Dr. Scott Shipley of Ascentech Enterprises makes an adjustment to the Spectrum unit. He is the project engineer for the effort working under the Engineering Services Contract at NASA's Kennedy Space Center. The device is being built for use aboard the International Space Station and is designed to expose different organisms to different color of fluorescent light while a camera records what's happening with time-laps imagery. Results from the Spectrum project will shed light on which living things are best suited for long-duration flights into deep space.

  17. Bézier B¯ projection

    NASA Astrophysics Data System (ADS)

    Miao, Di; Borden, Michael J.; Scott, Michael A.; Thomas, Derek C.

    2018-06-01

    In this paper we demonstrate the use of B\\'{e}zier projection to alleviate locking phenomena in structural mechanics applications of isogeometric analysis. Interpreting the well-known $\\bar{B}$ projection in two different ways we develop two formulations for locking problems in beams and nearly incompressible elastic solids. One formulation leads to a sparse symmetric symmetric system and the other leads to a sparse non-symmetric system. To demonstrate the utility of B\\'{e}zier projection for both geometry and material locking phenomena we focus on transverse shear locking in Timoshenko beams and volumetric locking in nearly compressible linear elasticity although the approach can be applied generally to other types of locking phenemona as well. B\\'{e}zier projection is a local projection technique with optimal approximation properties, which in many cases produces solutions that are comparable to global $L^2$ projection. In the context of $\\bar{B}$ methods, the use of B\\'ezier projection produces sparse stiffness matrices with only a slight increase in bandwidth when compared to standard displacement-based methods. Of particular importance is that the approach is applicable to any spline representation that can be written in B\\'ezier form like NURBS, T-splines, LR-splines, etc. We discuss in detail how to integrate this approach into an existing finite element framework with minimal disruption through the use of B\\'ezier extraction operators and a newly introduced dual basis for the B\\'{e}zierprojection operator. We then demonstrate the behavior of the two proposed formulations through several challenging benchmark problems.

  18. Assessing the costs attributed to project delay during project pre-construction stages

    DOT National Transportation Integrated Search

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  19. Assessing the costs attributed to project delay during project pre-construction stages.

    DOT National Transportation Integrated Search

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  20. Project Bibliographies: Tracking the Expansion of Knowledge Using JPL Project Publications

    ERIC Educational Resources Information Center

    Coppin, Ann

    2016-01-01

    The Jet Propulsion Laboratory (JPL) Library defines a project bibliography as a bibliography of publicly available publications relating to a specific JPL instrument or mission. These bibliographies may be used to share information between distant project team members, as part of the required Education and Public Outreach effort, or as part of…

  1. The Northeast Ghana Savannah Project--A Case Study in Project Design.

    ERIC Educational Resources Information Center

    Matlock, W. Gerald; Johnson, Jack D.

    This report examines a project design for land degradation problems in the northern and upper regions of Ghana. The project was jointly sponsored by the Ghana Council for Scientific and Industrial Research and the Agency for International Development. The council is responsible for coordinating the activities of 10 independent research institutes.…

  2. Null lifts and projective dynamics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cariglia, Marco, E-mail: marco@iceb.ufop.br

    2015-11-15

    We describe natural Hamiltonian systems using projective geometry. The null lift procedure endows the tangent bundle with a projective structure where the null Hamiltonian is identified with a projective conic and induces a Weyl geometry. Projective transformations generate a set of known and new dualities between Hamiltonian systems, as for example the phenomenon of coupling-constant metamorphosis. We conclude outlining how this construction can be extended to the quantum case for Eisenhart–Duval lifts.

  3. Probabilistic population projections with migration uncertainty

    PubMed Central

    Azose, Jonathan J.; Ševčíková, Hana; Raftery, Adrian E.

    2016-01-01

    We produce probabilistic projections of population for all countries based on probabilistic projections of fertility, mortality, and migration. We compare our projections to those from the United Nations’ Probabilistic Population Projections, which uses similar methods for fertility and mortality but deterministic migration projections. We find that uncertainty in migration projection is a substantial contributor to uncertainty in population projections for many countries. Prediction intervals for the populations of Northern America and Europe are over 70% wider, whereas prediction intervals for the populations of Africa, Asia, and the world as a whole are nearly unchanged. Out-of-sample validation shows that the model is reasonably well calibrated. PMID:27217571

  4. SDM Virtualness Project

    NASA Technical Reports Server (NTRS)

    Lim, Christopher Yit-Seong; Klein, Janice

    2004-01-01

    In the summer of 2001, NASA and Ford Motor Company co-sponsored a research project aimed at improving the education process and application of lessons learned through distant education. The System Design & Management Program (SDM) was used as a laboratory for improving distance learning capabilities. The research project was a follow up to previous research on globally dispersed teams.

  5. Projecting technological change

    Treesearch

    Kenneth E. Skog

    2007-01-01

    Improving efficiency in the use of both wood and nonwood inputs has characterized the US forest sector over the last 50 years. This chapter explores methods used to reflect this pattern of technological change and others in the Timber Assessment Projection System models. The development and use of three types of technology projection methods are explained: (1)...

  6. Project - line interaction implementing projects in JPL's Matrix

    NASA Technical Reports Server (NTRS)

    Baroff, Lynn E.

    2006-01-01

    Can programmatic and line organizations really work interdependently, to accomplish their work as a community? Does the matrix produce a culture in which individuals take personal responsibility for both immediate mission success and long-term growth? What is the secret to making a matrix enterprise actually work? This paper will consider those questions, and propose that developing an effective project-line partnership demands primary attention to personal interactions among people. Many potential problems can be addressed by careful definition of roles, responsibilities, and work processes for both parts of the matrix -- and by deliberate and clear communication between project and line organizations and individuals.

  7. Correlational Study of Project Managers' Competence Experience, Education, and Technology Experience on Project

    ERIC Educational Resources Information Center

    Hosford, Bryan

    2017-01-01

    Organizations continue to rely on information technology (IT) as a foundational element, yet poor IT project success continues to impact growth and innovation. Research into IT project success is widespread yet has focused on high-level project management attributes, not specific IT solutions. A review of the research literature revealed that the…

  8. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    ERIC Educational Resources Information Center

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  9. Analysing aeromagnetic, airborne gravity and radar data to unveil variable basal boundary conditions for the East Antarctic Ice Sheet in the Wilkes Subglacial Basin

    NASA Astrophysics Data System (ADS)

    Armadillo, Egidio; Ferraccioli, Fausto; Young, Duncan; Balbi, Pietro; Blankenship, Don; Jordan, Tom; Bozzo, Emanuele; Siegert, Martin

    2014-05-01

    ), but is unlikely to be strongly affected by Cretaceous or Cenozoic-age rifting, in contrast to the WAIS, which is largely underlain by the West Antarctic Rift System; iii) its bedrock is composed of rocks of different ages and composition, including Proterozoic basement, Neoproterozoic and Cambrian sediments intruded by Cambrian arc rocks, and cover rocks formed primarily by Beacon sediments intruded by Jurassic Ferrar sills (e.g. Cook et al., 2013 Nature Geoscience). Within the framework of the collaborative Italian-US-UK BABOC project a new international initiative has been launched to analyse and model variable geological boundary conditions in the WSB using geophysical data. A large amount of new ICECAP aerogeophysical observations have been acquired over four campaigns over the region since the International Polar Year, in particular over the southern part of the basin, and some profiles over the northern coastal margin of the basin. We will present an initial interpretation of the potential field signatures and radar data over the northern and central parts of the basin to help establish tectonic and lithological controls on the subglacial topography and different EAIS flow regimes within the WSB.

  10. FIFRA Project Officers Manual

    EPA Pesticide Factsheets

    The FIFRA Project Officers Manual provides guidance to new as well as experienced project officers in the management of grants and cooperative agreements under the Federal Insecticide, Fungicide and Rodenticide Act.

  11. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  12. The Hubble Space Telescope's Student ERO Pilot Project: Implementing Formal and Informal Collaborative Projects

    NASA Astrophysics Data System (ADS)

    Eisenhamer, Bonnie; Ryer, H.; McCallister, D.; Taylor, J.; Bishop, M.

    2010-05-01

    The Hubble Space Telescope's Early Release Observations (EROs) were revealed to the public on September 9, 2009, and K-12 students and educators in six states across the country are joining in the celebration. Students and educators in Maryland, Ohio, New York, California, New Mexico, and Delaware have been invited to participate in the Hubble Space Telescope's Student ERO Pilot Project. This is an interdisciplinary project created by STScI's Office of Public Outreach in which students research the four ERO objects and create various types of projects. In recognition of their participation, the projects are displayed at host institutions in each state (museum, science center, school, planetarium or library) during a special public event for participating students, their families, and teachers. As part of its evaluation program, STScI's Office of Public Outreach has been conducting an evaluation of the project to determine the viability and potential of conducting large-scale, formal/informal collaborative projects in the future. This poster will highlight preliminary findings and share lessons learned.

  13. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  14. Burnet Project

    PubMed Central

    Masellis, A.; Atiyeh, B.

    2009-01-01

    Summary The BurNet project, a pilot project of the Eumedis initiative, has become true. The Eumedis (EUro MEDiterranean Information Society) initiative is part of the MEDA programme of the EU to develop the Information Society in the Mediterranean area. In the health care sector, the objective of Eumedis is: the deployment of network-based solutions to interconnect - using userfriendly and affordable solutions - the actors at all levels of the "health care system" of the Euro-Mediterranean region. The Bur Net project interconnects 17 Burn Centres (BC) in the Mediterranean Area through an information network both to standardize courses of action in the field of prevention, treatment, and functional and psychological rehabilitation of burn patients and to coordinate interactions between BC and emergency rooms in peripheral hospitals using training/information activities and telemedicine to optimize first aid provided to burn patients before referral to a BC. Shared procedure protocols for prevention and the care and rehabilitation of patients, both at individual and mass level, will help to create an international specialized database and a Webbased teleconsultation system. PMID:21991176

  15. Pedagogy of stereographic projection

    NASA Astrophysics Data System (ADS)

    Blenkinsop, Tom

    1999-05-01

    Three sorts of problem are encountered by students learning stereographic projection. Lack of familiarity with compass directions and with the specification of planar and linear orientations is the most fundamental problem. The second problem is one of poor visualisation which prohibits the correct understanding of the principles and practice of projection, although students can sometimes perform remarkably well on certain exercises without this understanding. A third problem is a lack of interest or appreciation of the usefulness of the technique. A solution to the first problem is to provide a thorough grounding in compass directions, and concepts of strike, dip, dip direction, plunge and plunge bearing immediately before teaching stereographic projection. Visual aids, such as a transparent hemisphere to represent half of the projection sphere, and a large stereonet, are helpful for visualisation. Estimation and sketching exercises help to develop an understanding of the geometry of projection. Computer-aided teaching and plotting is recommended after an introduction to manual techniques. Interest can be stimulated through the use of exercises based on real geological maps.

  16. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  17. THE EOS ART Projects: Six Art Projects Inspired by Earth Science

    NASA Astrophysics Data System (ADS)

    Kerlow, I.

    2015-12-01

    The six projects produced under the artists' residencies at the Earth Observatory of Singapore (EOS) were inspired by Earth science and by the human experience in naturally hazardous regions. These contemporary artworks were created within an interdisciplinary framework that fostered collaborations between artists and scientists. The EOS ART 2010-2013 was a pilot program that also facilitated the active engagement of regional artists with issues related to Earth science, sustainable societies, and innovative methods for science outreach. An interdisciplinary jury of art critics, curators and Earth scientists selected art projects proposed by regional artists, and funds were awarded to develop and realize the projects.The artworks-including installations, photographs, and video art-were showcased in the "Unearthed" public exhibit at the Singapore Art Museum from March to July of 2014. A 92-page catalog accompanied the show and public seminars about interdisciplinary connections complemented the event. This was a unique example of collaboration between scientific and artistic institutions in Southeast Asia.The presentation provides an overview of the motivations, process and accomplished results. The art projects include "Coastline" by Zhang Xiao (China), "Lupang" by Clara Balaguer and Carlos Casas (Philippines and Spain), "Sound of the Earth" by Chen Sai Hua Kuan (Singapore), "Sudden Nature" by Isaac Kerlow (Mexico/USA), "The Possibility of Knowing" by Robert Zhao Renhui (Singapore), and "When Need Moves the Earth" by Sutthirat Supaparinya (Thailand). http://art-science-media.com/the-eos-art-projects/

  18. Dissemination and Exploitation: Project Goals beyond Science

    NASA Astrophysics Data System (ADS)

    Hamann, Kristin; Reitz, Anja

    2017-04-01

    Dissemination and Exploitation are essential parts of public funded projects. In Horizon 2020 a plan for the exploitation and dissemination of results (PEDR) is a requirement. The plan should contain a clear vision on the objectives of the project in relation to actions for dissemination and potential exploitation of the project results. The actions follow the basic idea to spread the knowledge and results gathered within the project and face the challenge of how to bring the results into potentially relevant policy circle and how they impact the market. The plan follows the purpose to assess the impact of the project and to address various target groups who are interested in the project results. Simply put, dissemination concentrates on the transfer of knowledge and exploitation on the commercialization of the project. Beyond the question of the measurability of project`s impact, strategies within science marketing can serve purposes beyond internal and external communication. Accordingly, project managers are facing the challenge to implement a dissemination and exploitation strategy that ideally supports the identification of all partners with the project and matches the current discourse of the project`s content within the society, politics and economy. A consolidated plan might unite all projects partners under a central idea and supports the identification with the project beyond the individual research questions. Which applications, strategies and methods can be used to bring forward a PEDR that accompanies a project successfully and allows a comprehensive assessment of the project afterwards? Which hurdles might project managers experience in the dissemination process and which tasks should be fulfilled by the project manager?

  19. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    NASA Astrophysics Data System (ADS)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  20. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, Kay L.; Singer, Mark R.

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles onmore » the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.« less

  1. Exe-Guard Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett; Marshall, Tim; Chavez, Adrian

    The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirusmore » methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a

  2. Municipal Complex Solar Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sher, Jono; Toth, Andrew

    2015-02-12

    This project is a great benefit to the City of Perth Amboy by saving energy and savings costs. The project serves as a great example to city residents about the importance of renewable energy, energy conservation and other environmental topics. An electronic display in the City Hall shows how much energy was generated on that day, how much energy is saved, and environmental benefits. The project serves to educate people of environmental concerns and may spark the interest of individuals in other environmental topics. Hopefully, other residents will be encouraged to use solar energy. The project is also saving moneymore » for the City and its taxpayers. Anywhere we can save money means that residents can pay less in taxes and/or the City can provide improved services.« less

  3. Desktop Computing Integration Project

    NASA Technical Reports Server (NTRS)

    Tureman, Robert L., Jr.

    1992-01-01

    The Desktop Computing Integration Project for the Human Resources Management Division (HRMD) of LaRC was designed to help division personnel use personal computing resources to perform job tasks. The three goals of the project were to involve HRMD personnel in desktop computing, link mainframe data to desktop capabilities, and to estimate training needs for the division. The project resulted in increased usage of personal computers by Awards specialists, an increased awareness of LaRC resources to help perform tasks, and personal computer output that was used in presentation of information to center personnel. In addition, the necessary skills for HRMD personal computer users were identified. The Awards Office was chosen for the project because of the consistency of their data requests and the desire of employees in that area to use the personal computer.

  4. Crustal architecture of the Pensacola-Pole Basin region in East Antarctica

    NASA Astrophysics Data System (ADS)

    Ferraccioli, F.; Jordan, T. A.; Forsberg, R.; Olesen, A. V.; Matsuoka, K.; Casal, T. G. D.

    2017-12-01

    During the 2015-2016 Antarctic campaign we flew a major aerogeophysical survey over the South Pole frontier, collecting ca 30,000 line km of new radio echo sounding, laser altimetry, airborne gravity and aeromagnetic data. The main aim of the PolarGAP project, supported by ESA was to fill in the data void in GOCE satellite gravity south of 83.3°S. Here we present the ice thickness, bedrock topography, and gravity and magnetic anomaly images derived from the survey and interpret these to investigate the crustal architecture and tectonic evolution of the South Pole region. Linear free-air gravity lows within the Pensacola-Pole Basin are interpreted as a system of glacially overdeepened grabens flanked by uplifted horst blocks, including the Pensacola Mountains, Patuxent Range and the Argentine Range. We link the grabens to the Jurassic Transantarctic rift system, which is also associated with voluminous tholeiitic magmatism of the Ferrar Large Igneous province. To investigate the potential influence of basement provinces and their tectonic boundaries on the Pensacola-Pole basin region, we combined PolarGAP aeromagnetic data with existing aeromagnetic datasets and satellite magnetic (MF7) patterns. Our magnetic compilation reveals that part of the eastern flank of the basin is controlled by a major inherited crustal boundary. The boundary is interpreted here as the southern edge of a hitherto unrecognised composite Precambrian microplate, extending from the Shackleton Range to the Pensacola-Pole basin itself. This inferred microplate forms a key missing link between the southern sector of the subduction-related Ross Orogen and the Pan-African age collisional suture and transpressional shear zones identified in the Shackleton Range.

  5. Cloudnet Project

    DOE Data Explorer

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  6. The MERMAID project

    NASA Technical Reports Server (NTRS)

    Cowderoy, A. J. C.; Jenkins, John O.; Poulymenakou, A

    1992-01-01

    The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

  7. The Iron Project

    NASA Technical Reports Server (NTRS)

    Pradhan, Anil K.

    2000-01-01

    Recent advances in theoretical atomic physics have enabled large-scale calculation of atomic parameters for a variety of atomic processes with high degree of precision. The development and application of these methods is the aim of the Iron Project. At present the primary focus is on collisional processes for all ions of iron, Fe I - FeXXVI, and other iron-peak elements; new work on radiative processes has also been initiated. Varied applications of the Iron Project work to X-ray astronomy are discussed, and more general applications to other spectral ranges are pointed out. The IP work forms the basis for more specialized projects such as the RmaX Project, and the work on photoionization/recombination, and aims to provide a comprehensive and self-consistent set of accurate collisional and radiative cross sections, and transition probabilities, within the framework of relativistic close coupling formulation using the Breit-Pauli R-Matrix method. An illustrative example is presented of how the IP data may be utilized in the formation of X-ray spectra of the K alpha complex at 6.7 keV from He-like Fe XXV.

  8. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  9. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  10. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and

  11. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  12. Machine translation project alternatives analysis

    NASA Technical Reports Server (NTRS)

    Bajis, Catherine J.; Bedford, Denise A. D.

    1993-01-01

    The Machine Translation Project consists of several components, two of which, the Project Plan and the Requirements Analysis, have already been delivered. The Project Plan details the overall rationale, objectives and time-table for the project as a whole. The Requirements Analysis compares a number of available machine translation systems, their capabilities, possible configurations, and costs. The Alternatives Analysis has resulted in a number of conclusions and recommendations to the NASA STI program concerning the acquisition of specific MT systems and related hardware and software.

  13. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  14. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  15. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  16. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  17. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  18. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  19. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  20. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    PubMed

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. Reconstruction for limited-projection fluorescence molecular tomography based on projected restarted conjugate gradient normal residual.

    PubMed

    Cao, Xu; Zhang, Bin; Liu, Fei; Wang, Xin; Bai, Jing

    2011-12-01

    Limited-projection fluorescence molecular tomography (FMT) can greatly reduce the acquisition time, which is suitable for resolving fast biology processes in vivo but suffers from severe ill-posedness because of the reconstruction using only limited projections. To overcome the severe ill-posedness, we report a reconstruction method based on the projected restarted conjugate gradient normal residual. The reconstruction results of two phantom experiments demonstrate that the proposed method is feasible for limited-projection FMT. © 2011 Optical Society of America

  2. Devils Lake Flood Control Project. Section 205. Detailed Project Report.

    DTIC Science & Technology

    1983-10-01

    Sd.U.JS IWE 00 RlEP0OAT II PERIOD COVERED SE~CTION 205 DETAILED PROJECT REPORT FLOOD CONTROL Final. Oct 1979-July 1983 PROJECT AT DEVILS LAKE. NORTH...a few feet. The light loading proposed for the site and thick cover of impervious material make more detailed evaluation of the strength and water...can cause low-oapaoity channels to overflow, resulting in flood damages to crops . Because the subbasin has no outlet near the existing water surface

  3. The Heartfile Lodhran CVD prevention project--end of project evaluation.

    PubMed

    Nishtar, Sania; Badar, Asma; Kamal, Mohammad Umer; Iqbal, Azhar; Bajwa, Rashid; Shah, Tauqeer; Larik, Zahid; Karim, Fazle; Mehmood, Mahmood ul Hassan; Jehangir, Haroon; Azam, Syed Iqbal; Mirza, Yasir Abbas; Khan, Shahzad Ali; Qayyum, Aamra; Aqeel, Fauzia; Bakir, Abdul; Rahim, Ejaz

    2007-01-01

    Mainstream preventive interventions often fail to reach poor populations with a high risk of cardiovascular diseases (CVDs) in Pakistan. A community-based CVD primary prevention project aimed at developing approaches to reduce risk factors in such populations was established by Heartfile in collaboration with the National Rural Support Program in the district of Lodhran. The project implemented a range of activities integrated with existing social and health service mechanisms during a three year intervention period 2000/01-03/04. These were targeted in 4 key settings: community health education, mass media interventions, training of health professionals and health education through Lady Health Workers. The project received support from the Department for International Development, U.K. At the community level, a pre-test-post-test quasi-experimental design was used for examining project outcomes related to the community component of the intervention. Pre and post-intervention (training) evaluations were conducted involving all health care providers in randomly selected workshops in order to determine baseline levels of knowledge and the impact of training on knowledge level. In order to assess practices of physician and non-physician health care providers patient interviews, with control comparisons were conducted at each health care facility. Significant positive changes were observed in knowledge levels at a community level in the district of intervention compared with baseline knowledge levels particularly in relation to a heart healthy diet, beneficial level of physical activity, the causes of high blood pressure and heart attack and the effects of high blood pressure and active and passive smoking on health. Significant changes in behaviors at a practice level were not shown in the district of intervention. However the project played a critical role in spurring national action for the prevention and control of non-communicable diseases and introducing

  4. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    ERIC Educational Resources Information Center

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  5. Construction project management handbook.

    DOT National Transportation Integrated Search

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  6. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    PubMed

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  7. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  8. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  9. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  10. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  11. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  12. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  13. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  14. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  15. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  16. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  17. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  18. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project restrictions. 850.151... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  19. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  20. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  1. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  2. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  3. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  4. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  5. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  6. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  7. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  8. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  9. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  10. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  11. Magnetotellurics applied to the study of the Guaraní aquifer in Entre Ríos Province, N-E Argentina

    NASA Astrophysics Data System (ADS)

    Favetto, Alicia; Curcio, Ana; Pomposiello, Cristina

    2011-07-01

    The South American Guaraní Aquifer System covers the entire Parana basin and part of the Chaco-Parana basin. This system is one of the most important groundwater reservoirs; it is shared by four neighboring countries covering an area larger than one million square kilometers. The geological units closely related to the Guaraní Aquifer are the Piramboia and Botucatu Formations that consist of Triassic-Jurassic aeolian, fluvial and lacustrine sandstones, and the Serra Geral basalts with clastic intercalations. Serra Geral, an effusive Cretaceous complex, covers the sandstones and provides a high degree of confinement to the system. This paper presents the interpretation of magnetotelluric (MT) data collected during 2007-2008 in Entre Ríos Province, Argentina. These data, recorded in three profiles, mainly provide the depth to the crystalline basement, determinant for the presence of aquifer-related sediments. Models showed that the discrimination of the basalts strongly depends on local electrical characteristics. Model information is quite consistent with the information from oil and thermal wells located close to the profiles.

  12. The differentiation of eucrites: The role of in situ crystallization

    NASA Astrophysics Data System (ADS)

    Barrat, J. A.; Blichert-Toft, J.; Gillet, Ph.; Keller, F.

    2000-09-01

    We report on major and trace element analyses of 17 eucrites, including three cumulate eucrites (Binda, Moore County, and Serra de Magé), determined by, respectively, ICP-AES and ICP-MS. The results obtained for Binda and Moore County are consistent with the model of Treiman (1997) for the formation of cumulate eucrites, which holds that these meteorites were produced from a eucritic melt. Our sample of Serra de Magé contains unusually large amounts of pyroxene and probably an accessory phase rich in HREEs and is therefore not representative of this eucrite as known from literature data. Our results for the noncumulate eucrites Bereba, Bouvante, Cachari, Caldera, Camel Donga, Ibitira, Jonzac, Juvinas, Lakangaon, Millbillillie, Padvarninkai, Pasamonte, Sioux County and Stannern are in good agreement with literature data. The observed decoupling between major and trace elements for noncumulate eucrites can be explained by in-situ crystallization during the differentiation of an asteroidal magma ocean. This model can further account for both the Nuevo Laredo and the Stannern trends but has as a consequence that none of the analyzed eucrites represents a primary melt.

  13. Ochres from rituals of prehistoric human funerals at the Toca do Enoque site, Piauí, Brazil

    NASA Astrophysics Data System (ADS)

    Cavalcante, Luis Carlos Duarte; da Luz, Maria De Fátima; Guidon, Niéde; Fabris, José Domingos; Ardisson, José Domingos

    2011-11-01

    The archaeological site known as Toca do Enoque (geographical coordinates, 09° 14' 65.3″ S 43° 55' 62.5″ W) is a rock shelter located in the Serra das Andorinhas (Serra das Confusões National Park), rural area of the city of Guaribas, state of Piauí, Brazil. Several rupestrian paintings (anthropomorphic and zoomorphic motifs along with some pure graphisms), predominantly in red, are found on the sandstone walls. Charcoals, lithic materials, necklaces with teeth, animal bones, gastropod shells, ochres and human skeletons (dated from 6,220 ± 40 to 6,610 ± 40 years before present, BP) were identified in recent excavations in this shelter. Red and yellow ochre samples were collected from prehistoric funeral structures and analyzed with powder X-ray diffractometry, Fourier-transform infrared spectroscopy and 57Fe transmission Mössbauer spectroscopy at 298 K and 80 K. Mössbauer data indicate that the red ochre do contain predominantly hematite ( α-Fe2O3) whereas goethite ( α-FeOOH) is the major mineral in the yellow ochre.

  14. Subsistence restoration project: Food safety testing. Exxon Valdez Oil Spill Restoration Project. Final report restoration project 94279

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miraglia, R.A.; Chartrand, A.W.

    1997-05-01

    The goal of this project was to restore the confidence of subsistence users in their abilities to determine the safety of their resources. Methods included community meetings, collection and testing of subsistence resources samples for hydrocarbon contamination, accompanying community representatives on tours of the laboratory where tests were conducted and informational newsletters. Over the two years of the project combined, 228 composite samples of edible tissues from shellfish were tested. The bile of forty rockfish, six sockeye salmon, twelve seals, twenty-three ducks were tested for the presence of hydrocarbon metabolites. Edible tissue (blubber) from seals was also tested. Generally, themore » tests showed such low levels of hydrocarbons and their metabolites, as to be within the test`s margin of error. The project was partly successful in disseminating the subsistence food safety advice of the Oil Spill Health Task Force and in improving the level of trust in the results of hydrocarbon tests on the resources.« less

  15. The accuracy of general practitioner workforce projections

    PubMed Central

    2013-01-01

    Background Health workforce projections are important instruments to prevent imbalances in the health workforce. For both the tenability and further development of these projections, it is important to evaluate the accuracy of workforce projections. In the Netherlands, health workforce projections have been done since 2000 to support health workforce planning. What is the accuracy of the techniques of these Dutch general practitioner workforce projections? Methods We backtested the workforce projection model by comparing the ex-post projected number of general practitioners with the observed number of general practitioners between 1998 and 2011. Averages of historical data were used for all elements except for inflow in training. As the required training inflow is the key result of the workforce planning model, and has actually determined past adjustments of training inflow, the accuracy of the model was backtested using the observed training inflow and not an average of historical data to avoid the interference of past policy decisions. The accuracy of projections with different lengths of projection horizon and base period (on which the projections are based) was tested. Results The workforce projection model underestimated the number of active Dutch general practitioners in most years. The mean absolute percentage errors range from 1.9% to 14.9%, with the projections being more accurate in more recent years. Furthermore, projections with a shorter projection horizon have a higher accuracy than those with a longer horizon. Unexpectedly, projections with a shorter base period have a higher accuracy than those with a longer base period. Conclusions According to the results of the present study, forecasting the size of the future workforce did not become more difficult between 1998 and 2011, as we originally expected. Furthermore, the projections with a short projection horizon and a short base period are more accurate than projections with a longer projection

  16. Colorado State Capitol Geothermal project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shepherd, Lance

    Colorado State Capitol Geothermal Project - Final report is redacted due to space constraints. This project was an innovative large-scale ground-source heat pump (GSHP) project at the Colorado State Capitol in Denver, Colorado. The project employed two large wells on the property. One for pulling water from the aquifer, and another for returning the water to the aquifer, after performing the heat exchange. The two wells can work in either direction. Heat extracted/added to the water via a heat exchanger is used to perform space conditioning in the building.

  17. Labeling Projections on Published Maps

    USGS Publications Warehouse

    Snyder, John P.

    1987-01-01

    To permit accurate scaling on a map, and to use the map as a source of accurate positions in the transfer of data, certain parameters - such as the standard parallels selected for a conic projection - must be stated on the map. This information is often missing on published maps. Three current major world atlases are evaluated with respect to map projection identification. The parameters essential for the projections used in these three atlases are discussed and listed. These parameters should be stated on any map based on the same projection.

  18. Geospace exploration project: Arase (ERG)

    NASA Astrophysics Data System (ADS)

    Miyoshi, Y.; Kasaba, Y.; Shinohara, I.; Takashima, T.; Asamura, K.; Matsumoto, H.; Higashio, N.; Mitani, T.; Kasahara, S.; Yokota, S.; Wang, S.; Kazama, Y.; Kasahara, Y.; Yagitani, S.; Matsuoka, A.; Kojima, H.; Katoh, Y.; Shiokawa, K.; Seki, K.; Fujimoto, M.; Ono, T.; ERG project Group

    2017-06-01

    The ERG (Exploration of energization and Radiation in Geospace) is Japanese geospace exploration project. The project focuses on relativistic electron acceleration mechanism of the outer belt and dynamics of space storms in the context of the cross-energy coupling via wave-particle interactions. The project consists of the satellite observation team, the ground-based network observation team, and integrated-data analysis/simulation team. The satellite was launched on December 20 2016 and has been nicknamed, “Arase”. This paper describes overview of the project and future plan for observations.

  19. Phased Project Planning Guidelines

    NASA Technical Reports Server (NTRS)

    1968-01-01

    NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

  20. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    ERIC Educational Resources Information Center

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…