Sample records for bridge conference cardiff

  1. Summary Report: 62nd Annual Congress - British Association of Paediatric Surgeons Cardiff, Wales, UK, July 22nd- 24th, 2015.

    PubMed

    Davenport, Mark

    2016-02-01

    The 62nd British Association of Paediatric Surgeons (BAPS) Annual Conference was held July 22-24, 2015, in Cardiff, Wales. This congress issue contains papers presented during the open sessions and transcripts based on invited lectures. Copyright © 2015 Elsevier Inc. All rights reserved.

  2. The Cardiff paediatric laryngoscope blade: a comparison with the Miller size 1 and Macintosh size 2 laryngoscope blades.

    PubMed

    Jones, R M; Jones, P L; Gildersleve, C D; Hall, J E; Harding, L J E; Chawathe, M S

    2004-10-01

    The Cardiff paediatric laryngoscope blade is a single blade that has been designed for use in children from birth to adolescence. This open, randomised, crossover study compared the Cardiff blade with the straight, size 1, Miller laryngoscope blade in 39 infants under 1 years of age and the curved, size 2, Macintosh blade in 39 children aged 1-16 years. The same laryngoscopic view was obtained with the Cardiff and Miller blades in 26 patients; the view was better with the Cardiff blade in seven patients and better with the Miller blade in six (median (IQR [range]) grade of laryngoscopy 1 (1-2 [1-3]) vs. 1 (1-2 [1-3]), respectively; p = 0.405). The Cardiff blade was faster at gaining a view than the Miller blade (mean (SD) time 8.5 (2.9) s vs. 10.2 (3.5) s, respectively; 95% CI for difference -2.8 to -0.4; p = 0.009). The Cardiff and Macintosh blades produced the same view in 32 patients; the view was better with the Cardiff blade in seven patients (median (IQR [range]) grade of laryngoscopy 1 (1-1 [1-3]) vs. 1 (1-2 [1-3]), respectively; p = 0.008). There was no difference in time to gain these views: mean (SD) 8.7 (3.0) s vs. 9.3 (2.7) s, respectively (95% CI for difference -1.58 to 0.40; p = 0.237). The Cardiff paediatric laryngoscope blade compares favourably with these two established laryngoscope blades in children.

  3. Fifth National Seismic Conference on Bridges & Highways : innovations in earthquake engineering for highway structures

    DOT National Transportation Integrated Search

    2007-02-01

    This document is the conference program of the 5th National Seismic Conference on Bridges and Highways. The conference was held in San Francisco on September 18-20, 2006 and attracted over 300 engineers, academician, and students from around the worl...

  4. Ready for practice? A study of confidence levels of final year dental students at Cardiff University and University College Cork.

    PubMed

    Honey, J; Lynch, C D; Burke, F M; Gilmour, A S M

    2011-05-01

    The aim of this study was to describe the self-reported confidence levels of final year students at the School of Dentistry, Cardiff University and at the University Dental School & Hospital, Cork, Ireland in performing a variety of dental procedures commonly completed in primary dental care settings. A questionnaire was distributed to 61 final year students at Cardiff and 34 final year students at Cork. Information requested related to the respondents confidence in performing a variety of routine clinical tasks, using a five-point scale (1=very little confidence, 5=very confident). Comparisons were made between the two schools, gender of the respondent, and whether or not a student intended completing a year of vocational training after graduation. A response rate of 74% was achieved (n=70). The greatest self-reported confidence scores were for 'scale and polish' (4.61), fissure sealants (4.54) and delivery of oral hygiene instruction (4.51). Areas with the least confidence were placement of stainless steel crowns (2.83), vital tooth bleaching (2.39) and surgical extractions (2.26). Students at Cardiff were more confident than those at Cork in performing simple extractions (Cardiff: 4.31; Cork: 3.76) and surgical extractions (Cardiff: 2.61; Cork: 1.88), whilst students in Cork were more confident in caries diagnosis (Cork: 4.24; Cardiff: 3.89) fissure sealing (Cork: 4.76; Cardiff: 4.33) and placement of preventive resin restorations (Cork: 4.68; Cardiff: 4.22).   Final year students at Cardiff and Cork were most confident in simpler procedures and procedures in which they had had most clinical experience. They were least confident in more complex procedures and procedures in which they had the least clinical experience. Increased clinical time in complex procedures may help in increasing final year students' confidence in those areas. © 2011 John Wiley & Sons A/S.

  5. Bridging Learning Opportunities: AMTEC '93 Conference Proceedings (Windsor, Ontario, Canada, June 14-16, 1993).

    ERIC Educational Resources Information Center

    Selby, Stuart, Ed.; Marzotto, Esio, Ed.

    The bridging theme of the AMTEC'93 conference provided the stimulation to look beyond traditional boundaries: across international borders; across levels of disciplines and school systems; across social differences and across individual differences. These bridges can help make learning more effective, as can attention to related contemporary…

  6. Attitudes of final-year dental students to bleaching of vital and non-vital teeth in Cardiff, Cork, and Malmö.

    PubMed

    Hatherell, S; Lynch, C D; Burke, F M; Ericson, D; Gilmour, A S M

    2011-04-01

    The aim of this study was to determine attitudes of final-year dental students in Cardiff, Cork and Malmö towards tooth whitening. Following receipt of ethical approval, pre-piloted questionnaires were distributed to final-year dental students in Cork, Cardiff, and Malmö as close as possible to graduation. The questionnaire sought information relating to various opinions and attitudes towards the use of bleaching techniques including safety of bleaching, confidence in the provision of bleaching, recommendations to patients, teaching received, awareness of restrictions on the use of bleaching products and management of simulated clinical scenarios. Eighty three per cent (n = 116) of questionnaires were returned. Cork dental students had the most didactic teaching (2-h vital, 1-h non-vital bleaching) compared to Cardiff or Malmö students (0 h each). More Cork students regarded bleaching as safe (76%, n = 28) than Cardiff (70%, n = 32) or Malmö (36%, n = 12) students. More than 50% of Cork students feel they know enough about bleaching to provide it in practice, significantly more than Cardiff (< 25%) or Malmö (< 25%) students. The majority of students would provide vital bleaching after qualification (100% (n = 37) Cork; 82% (n = 27) Malmö; 76% (n = 35) Cardiff). In simulated clinical scenarios, more Cork students would propose bleaching treatments (89%n = 33) than Malmö (64%n = 21) or Cardiff (48%n= 22) students. Variations exist in the attitudes and approaches of three European dental schools towards bleaching. Dental students need to be best prepared to meet the needs of their future patients. © 2010 Blackwell Publishing Ltd.

  7. Job Rotation at Cardiff University Library Service: A Pilot Study

    ERIC Educational Resources Information Center

    Earney, Sally; Martins, Ana

    2009-01-01

    This paper presents case study research of a job rotation pilot involving six library assistants in Cardiff University Library Service (ULS). Firstly, it investigates whether job rotation improves motivation and secondly, whether there is an improvement in skills, both technical and "soft". Following a review of the literature,…

  8. Air Pollution and Health: Bridging the Gap from Health Outcomes: Conference Summary

    EPA Science Inventory

    “Air Pollution and Health: Bridging the Gap from Sources to Health Outcomes,” an international specialty conference sponsored by the American Association for Aerosol Research, was held to address key uncertainties in our understanding of adverse health effects related to air po...

  9. Helping Teenagers Stop Smoking: Comparative Observations across Youth Settings in Cardiff

    ERIC Educational Resources Information Center

    Bowles, Hannah; Maher, Alison; Sage, Robert

    2009-01-01

    Objective: This paper presents comparative observations between schools/colleges, youth centres, and specialist youth provision, in relation to delivery of the 2tuff2puff six-week smoking cessation and awareness programme to young people in Cardiff. Design: A six-week smoking cessation programme was delivered to 12-23 year olds in various youth…

  10. The incidence of Crohn's disease in Cardiff over the last 75 years: an update for 1996-2005.

    PubMed

    Gunesh, S; Thomas, G A O; Williams, G T; Roberts, A; Hawthorne, A B

    2008-02-01

    The incidence of Crohn's disease rose rapidly in industralized countries over the past 50 years, but it is unclear whether the incidence is still rising or has reached a plateau. To update the long-term incidence study of Crohn's disease in Cardiff for 1996-2005, to investigate whether incidence is still rising and to study changes in disease characteristics over time. Crohn's cases identified by retrospective analysis of hospital records as in previous studies in Cardiff. Two hundred and twelve cases were identified. Corrected incidence for this decade was 66 x 10(6) per year (95% confidence interval: 58-76), showing a continuing rise compared to previous decades. The proportion with colonic disease at presentation continues to rise (43%) with a corresponding fall in those with terminal ileal disease. There remains a strong female preponderance (F:M 1.6:1) as in previous studies. The incidence in children under age 16 continues to rise, and the median age at diagnosis has fallen slightly. Crohn's disease incidence continues to rise slowly in Cardiff with a continuing increase in those presenting with colonic disease, which is now the commonest disease pattern.

  11. Sexism and anatomy, as discerned in textbooks and as perceived by medical students at Cardiff University and University of Paris Descartes.

    PubMed

    Morgan, Susan; Plaisant, Odile; Lignier, Baptiste; Moxham, Bernard J

    2014-03-01

    Contemporary textbooks of anatomy and surface anatomy were evaluated to ascertain whether they were gender-neutral. The evidence of this, and previous studies, suggests that, both in terms of imagery and text, many textbooks lack neutrality. To further investigate such matters, we provided second-year medical students studying at Cardiff University (n = 293) and at the Paris Descartes University (n = 142) during the 2011-2012 academic year with a questionnaire inviting them to address the possibility that social/gender factors hinder the dispassionate representation of anatomy. Ethical approval was obtained from both Cardiff and Paris universities. Eighty-six percent of the students at Cardiff and 39% at Paris Descartes responded and provided data for analysis. The hypothesis tested is that medical students perceive a gender bias that is reflected in the books they read and the tuition they receive. Our findings suggest that, while students recognise the importance of gender issues and do not wish to associate with sexism, most are unaware of the possible negative aspects of sexism within anatomy. In this respect, the findings do not support our hypothesis. Nevertheless, we recommended that teachers of anatomy and authors of anatomy textbooks should be aware of the possibility of adverse effects on professional matters relating to equality and diversity issues. © 2013 Anatomical Society.

  12. Health as a bridge to peace and trust in Myanmar: The 21st Century Panglong Conference.

    PubMed

    Tang, Kun; Zhao, Yingxi

    2017-06-28

    The twenty-first Century Panglong Conference, proposed by Aung San Suu Kyi and her National League for Democracy, has concluded with unsatisfactory results. This five-day conference attracted global attention and wide endorsements from the United Nations and many other key stakeholders. The broad framework of the peace dialogue included various social and economic issues. However, the implication of the conference on the health system strengthening efforts in ethnic areas was largely unknown. Although a "convergence model" was proposed by organizations in Thai-Myanmar borders as a roadmap for integrations of the national and ethnic health systems years ago, the genuine bottlenecks beneath have not been addressed. This commentary discussed the Panglong Conference and its implication for the health systems in ethnic regions, as well as the bottlenecks of a "peace process" in health sector. It outlined a few key steps to achieve health system convergence between national and ethnic health systems, the outcome of which will not only improve the health status of the ethnic regions, but also help strengthen mutual trust and understanding among peoples, as a powerful bridge for peace.

  13. Building Bridges through Scientific Conferences.

    PubMed

    Zierath, Juleen R

    2016-11-17

    Getting together to exchange ideas, forge collaborations, and disseminate knowledge is a long-standing tradition of scientific communities. How conferences are serving the community, what their current challenges are, and what is in store for the future of conferences are the topics covered in this Commentary. Copyright © 2016 Elsevier Inc. All rights reserved.

  14. Cardiff acne disability index in Sarawak, Malaysia.

    PubMed

    Yap, Felix Boon-Bin

    2012-05-01

    Acne is considered a cosmetic nuisance in Malaysia since no insurance coverage is provided for its treatment. Its psychological impact is unknown. The aim of this study is to determine the impact of acne on quality of life and its relationship with severity. A cross-sectional study using the Cardiff acne disability index (CADI) and Global Acne Grading System for acne severity grading was done in three government-run dermatology clinics in Sarawak, Malaysia. The study cohort of 200 patients had a mean CADI score of 5.1. Most of the patients (59.5%) had mild CADI impairment, with the domain of feelings most affected. Patients with a family income <1,000 United States Dollor/month had a higher mean CADI (mean 5.5 vs. 4.4; p=0.04). Females, indigenous groups, and patients with tertiary education tended to have more severe CADI impairment (p>0.05). The correlation between CADI and mild acne severity was low (Pearson correlation coefficient=0.35; p<0.001) but became insignificant for moderate and severe acne. Acne impairment in Sarawak was moderate and must be addressed. It should be viewed as a psychologically disabling disease requiring optimal management and resource allocation.

  15. Sexism and anatomy, as discerned in textbooks and as perceived by medical students at Cardiff University and University of Paris Descartes

    PubMed Central

    Morgan, Susan; Plaisant, Odile; Lignier, Baptiste; Moxham, Bernard J

    2014-01-01

    Contemporary textbooks of anatomy and surface anatomy were evaluated to ascertain whether they were gender-neutral. The evidence of this, and previous studies, suggests that, both in terms of imagery and text, many textbooks lack neutrality. To further investigate such matters, we provided second-year medical students studying at Cardiff University (n = 293) and at the Paris Descartes University (n = 142) during the 2011–2012 academic year with a questionnaire inviting them to address the possibility that social/gender factors hinder the dispassionate representation of anatomy. Ethical approval was obtained from both Cardiff and Paris universities. Eighty-six percent of the students at Cardiff and 39% at Paris Descartes responded and provided data for analysis. The hypothesis tested is that medical students perceive a gender bias that is reflected in the books they read and the tuition they receive. Our findings suggest that, while students recognise the importance of gender issues and do not wish to associate with sexism, most are unaware of the possible negative aspects of sexism within anatomy. In this respect, the findings do not support our hypothesis. Nevertheless, we recommended that teachers of anatomy and authors of anatomy textbooks should be aware of the possibility of adverse effects on professional matters relating to equality and diversity issues. PMID:23781866

  16. Editorial - Special Issue on the Ninth International Conference on Aeolian Research - ICAR IX (Coastal Dune Processes and Aeolian Transport)

    NASA Astrophysics Data System (ADS)

    da Silva, Graziela Miot

    2018-04-01

    This special issue combines some of the papers related to coastal dune processes and aeolian sediment transport that were presented at the Ninth International Conference on Aeolian Research - ICAR IX. The conference was held between 4 and 8 of July 2016 in Mildura, Australia, organized by the International Society for Aeolian Research (ISAR) and convened by Adrian Chappell (Cardiff University), Craig Strong (Australian National University), Stephen Cattle (University of Sydney), Patrick Hesp (Flinders University), John Leys (New South Wales Office of Environment and Heritage), Lynda Petherick (University of Wellington) and Nick Webb (USDA-ARS Jornada Experimental Range).

  17. Cardiff Acne Disability Index in Sarawak, Malaysia

    PubMed Central

    2012-01-01

    Background Acne is considered a cosmetic nuisance in Malaysia since no insurance coverage is provided for its treatment. Its psychological impact is unknown. Objective The aim of this study is to determine the impact of acne on quality of life and its relationship with severity. Methods A cross-sectional study using the Cardiff acne disability index (CADI) and Global Acne Grading System for acne severity grading was done in three government-run dermatology clinics in Sarawak, Malaysia. Results The study cohort of 200 patients had a mean CADI score of 5.1. Most of the patients (59.5%) had mild CADI impairment, with the domain of feelings most affected. Patients with a family income <1,000 United States Dollor/month had a higher mean CADI (mean 5.5 vs. 4.4; p=0.04). Females, indigenous groups, and patients with tertiary education tended to have more severe CADI impairment (p>0.05). The correlation between CADI and mild acne severity was low (Pearson correlation coefficient=0.35; p<0.001) but became insignificant for moderate and severe acne. Conclusion Acne impairment in Sarawak was moderate and must be addressed. It should be viewed as a psychologically disabling disease requiring optimal management and resource allocation. PMID:22577265

  18. The 2nd United Kingdom Extracellular Vesicle Forum Meeting Abstracts: 15 December 2015, Hadyn Ellis Building, Cardiff University.

    PubMed

    Clayton, Aled; Lawson, Charlotte; Gardiner, Chris; Harrison, Paul; Carter, David

    2016-01-01

    The UK Extracellular Vesicles (UKEV) Forum meetings were born of the realization that there were a number of UK laboratories studying extracellular vesicle biology and using similar techniques but without a regular national meeting dedicated to EVs at which to share their findings. This was compounded by the fact that many of these labs were working in different fields and thus networking and sharing of ideas and best practice was sometimes difficult. The first workshop was organized in 2013 by Dr Charlotte Lawson, under the auspices of the Society for Endocrinology, led to the founding of the UKEV Forum and the organization of a British Heart Foundation sponsored 1-day conference held in London in December 2014. Although growing in size every year, the central aims of these workshops have remained the same: to provide a forum for discussion and exchange of ideas, to allow young scientists to present their data in the form of short talks and poster presentations and to discuss their work with more established scientists in the field. Here we include the presented abstracts for the 2015 1-day conference hosted by Cardiff University. This meeting was attended by approximately 130 delegates throughout the United Kingdom, but also attended by delegates from Belgium, Netherlands, France, Ireland and other nations. The day composed of plenary presentations from Prof Matthias Belting, Lund University, Sweden and Dr Guillaume van Niel, Institut Curie, Paris together with 10 short presentations from submitted abstracts. The topics covered were broad, with sessions on Mechanisms of EV production, EVs in Infection, EVs in Cancer and in Blood and Characterizing EVs in Biological fluids. This hopefully gives a reflection of the range of EV-related studies being conducted currently in the UK. There were also 33 poster presentations equally broad in subject matter. The organizers are grateful to the Life Science Research Network Wales - a Welsh government-funding scheme that part

  19. Bridging the Gap: From Ivory to Corporate Tower. Proceedings of the ABCA Midwest Regional Conference (Ames, Iowa, April 19-20, 1984).

    ERIC Educational Resources Information Center

    Pearson, Patricia, Ed.

    Proceedings drawn from a conference on business communication, the 21 papers in this collection are grouped under the headings Corporate Tower Views, Bridging the Gap, and Ivory Tower Views to better reflect the joint concerns of professional communicators on the job as well as the concerns of those who teach business communication. Among the…

  20. [Factorial Structure of the Cardiff Anomalous Perceptions Scale (CAPS) in a Colombian Population Sample].

    PubMed

    Tamayo-Agudelo, William; Jaén-Moreno, María José; Luque-Luque, Rogelio

    2015-01-01

    The continuum hypothesis of psychosis assumes that hallucinations are not exclusive of psychotic disorders. A number of psychometric tests have been developed to assess psychosis using a dimensional model. To determine the factorial structure of the Cardiff Anomalous Perceptions Scale (CAPS) for the Colombian population, and to contrast the fit of two factor models previously reported in the literature by conducting a confirmatory factor analysis (CFA). This was a cross-sectional study in which 207 subjects from the general population were assessed using the Cardiff Anomalous Perceptions Scale. A two-factor structure with acceptable ordinal alpha coefficients (α=.88 and α=.87) was found. One factor gathered items related to multimodal perceptual alterations, and a second factor grouped items related with experiences linked to the temporal lobe. The analysis of the first factor indicated that it was dependent on cultural issues for the interpretation of sensations. The second factor appeared almost unchanged on diverse populations, suggesting its transcultural character. When comparing the models proposed by Bell et al. and Jaen-Moreno et al. using the data obtained from the sample, the confirmatory factor analysis conducted indicated inadequate goodness-of-fit indexes (χ(2)). However, some incremental goodness-of-fit indexes (normalized χ(2) [RMSEA]) were acceptable. The Jaén-Moreno et al. model showed the best fit to the data collected from the Colombian sample. The factorial structure of CAPS for the Colombian population appears to be sensitive to cultural issues, especially when describing anomalous sensorial experiences. Copyright © 2015 Asociación Colombiana de Psiquiatría. Publicado por Elsevier España. All rights reserved.

  1. Translation and cross-cultural adaptation of the Cardiff Wound Impact Schedule to Brazilian Portuguese.

    PubMed

    Augusto, Fabiana da Silva; Blanes, Leila; Nicodemo, Denise; Ferreira, Lydia Masako

    2017-05-01

    To translate into Brazilian Portuguese and cross-culturally adapt the Cardiff Wound Impact Schedule, a specific measure of health-related quality of life (HRQoL) for patients with chronic wounds. Chronic wounds have a relevant impact on the HRQoL of patients. However, there are few instruments cross-culturally adapted and validated in Brazil to assess HRQoL in patients with wounds. A descriptive cross-sectional study was conducted following six steps: (1) translation of the original instrument into Brazilian-Portuguese by two independent translators; (2) construction of a consensus version based on both translations; (3) two independent back-translations into English of the consensus version; (4) review by an expert committee and construction of the pre-final version; (5) testing of the pre-final version on patients with chronic wounds; and (6) construction of the final version. The psychometric properties of the instrument were tested on 30 patients with chronic wounds of the lower limb; 76.7% were men, 70.0% had traumatic wounds, and 43.3% had the wound for more than 1 year. Participants were recruited from an outpatient wound care clinic in São Paulo, Brazil. The final version approved by the expert committee was well understood by all patients who participate in the study and had satisfactory face validity, content validity, and internal consistency, with Cronbach's alpha coefficients ranging from 0.681 to 0.920. The cross-culturally adapted Brazilian-Portuguese version of the instrument showed satisfactory face and content validity, good internal consistency, and was named Cardiff Wound Impact Schedule-Federal University of São Paulo School of Medicine or CWIS-UNIFESP/EPM. Copyright © 2016 Tissue Viability Society. Published by Elsevier Ltd. All rights reserved.

  2. The Bridge: Connecting Science and Policy Debuts in the AGU Blogosphere

    NASA Astrophysics Data System (ADS)

    Gilley, Meg

    2013-11-01

    A new blog, The Bridge: Connecting Science and Policy, has joined the AGU blog family to provide a platform to discuss the intersection of science and policy with the public and decision makers. The Bridge, written by AGU Public Affairs staff and guest posters, debuted as part of the 2013 Science Policy Conference and was so successful that the Public Affairs team kept posting after the conference.

  3. Building Bridges to Literacy. The Twenty-Seventh Yearbook: A Peer Reviewed Publication of the College Reading Association. [Papers from the College Reading Association Conference, 2004

    ERIC Educational Resources Information Center

    Linder, Patricia E., Ed.; Sampson, Mary Beth, Ed.; Dugan, JoAnn R., Ed.; Brancato, Barrie, Ed.

    2005-01-01

    The theme of the College Reading Association 2004 annual conference in Delray Beach, Florida, was "Building Bridges: Reaching beyond Our Borders." The articles in this yearbook show how reflection and thinking outside the box will make a difference in preservice teacher education. This Yearbook begins with Wayne Linek's presidential address. In…

  4. Thomas Graham Brown (1882–1965): Behind the Scenes at the Cardiff Institute of Physiology

    PubMed Central

    Jones, J. Gareth; Tansey, E.M. (Tilli); Stuart, Douglas G.

    2011-01-01

    Thomas Graham Brown undertook seminal experiments on the neural control of locomotion between 1910 and 1915. Although elected to the Royal Society in 1927, his locomotion research was largely ignored until the 1960s when it was championed and extended by the distinguished neuroscientist, Anders Lundberg. Puzzlingly, Graham Brown's published research stopped in the 1920s and he became renowned as a mountaineer. In this article, we review his life and multifaceted career, including his active neurological service in WWI. We outline events behind the scenes during his tenure at Cardiff's Institute of Physiology in Wales, UK, including an interview with his technician, Terrence J. Surman, who worked in this institute for over half a century.

  5. [Examinations with the Cardiff Acuity Test].

    PubMed

    Gräf, M; Becker, R; Neff, A; Kaufmann, H

    1996-08-01

    Recently, a new preferential looking (PL) test has been presented for measuring visual acuity in infants and young children (Cardiff Acuity Test, CAT). The PL target is a schematic vanishing picture composed of isoluminant lines with different spatial orientations. Fifty-three healthy children (4-34 months, group 1), 28 (4-35 months) children at risk for amblyopia due to strabismus (group 2), 19 healthy subjects, and 157 patients (group 3) were tested with the CAT. In group 2 the CAT was compared with the fixation preference test. In group 3 the CAT was compared with a recognition test (Landolt C test). In group 1 the interocular difference of the CAT data was a maximum of 1 dB (70% 0 dB, 30% 1 dB, 1/3 so-called octave). Thus, an interocular difference of > 1 dB was considered to be suggestive of monocular or asymmetrical visual impairment. The maximum value 6/6 was frequently achieved (RE 44%, LE 36%, > 18 months RE 57%, LE 46%). In group 2 only 20% of the monolateral strabismic children showed an interocular difference > 1 dB in the CAT. In group 3 we found significant correlations between the CAT and Landolt acuity. A ratio of about 1.7/1 between CAT and Landolt acuity remained constant in cataract eyes as compared to healthy eyes. In amblyopic eyes due to strabismus this ratio was 3.7/1. Thus, amblyopia was underestimated with the CAT. Without limiting the examination distance, interocular differences > 1 dB in the CAT occurred in 52% of the strabismic amblyopic patients (potential sensitivity). At a distance of 1 m this rate decreased to 22% (real sensitivity). In conclusion, the CAT definitely lacks sensitivity for strabismic amblyopia. The data suggest that the real sensitivity could be improved by using higher spatial frequencies. The use of familiar shapes instead of gratings such as PL targets affects cooperation favorably in 12- to 36-month-old children.

  6. Antibiotic prescribing for endodontic therapies: a comparative survey between general dental practitioners and final year Bachelor of Dental Surgery students in Cardiff, UK.

    PubMed

    Al Masan, A A; Dummer, P M H; Farnell, D J J; Vianna, M E

    2018-07-01

    To evaluate the views of final year dental surgery students (BDS; G1) at Cardiff University and general dental practitioners (GDPs; G2) within the geographic area of Cardiff, Wales, on antibiotic prescribing for endodontic conditions, and investigate the potential differences between the two groups. A cross-sectional online questionnaire-based survey of 12 qualitative and quantitative questions was distributed to 76 final year BDS Cardiff University students and 55 dental practices within Cardiff, UK. Six questions recorded general information, and the remaining questions included a series of hypothetical clinical scenarios, where the participants were asked to state whether they would or would not prescribe antibiotics. The data were analysed using spss version 23 to produce descriptive statistics, contingency tables and to run chi-square (χ²) tests, Fisher's exact tests and relative risk calculations. The response rate was 60% (n = 79). All G1 participants were aware of the consequences of antibiotic overuse. Approximately 60% of responders were aware of guidelines for antibiotic use in endodontic therapies, and 83% would only use antibiotics for a limited selection of patients (e.g. patients with systemic complications). G1 responses to clinical scenarios indicated overall that they were comparable to the ideal answers except for acute apical abscess (64% believed that antibiotics were indicated). The majority of G2 were aware of the consequences of antibiotic overuse. Only 28% of G2 were aware of guidelines for antibiotic use in endodontic therapies. Overall responses revealed that antibiotics would be prescribed for: systemic complications (78%), acute apical abscess (72%) and symptomatic apical periodontitis (28%). The clinical scenarios revealed G1 were more likely to prescribe antibiotics compared to G2 for cases of necrotic pulp with symptomatic apical periodontitis without systemic complications (incorrect answer) and less likely to other clinical

  7. Bridge scour conference shares knowledge and innovations : Tech Transfer Spotlight

    DOT National Transportation Integrated Search

    2018-01-01

    The National Cooperative Highway Research Programs Domestic Scan (NCHRP Project 20-68A) on bridge scour risk management brought more than 30 national bridge scour experts together for a week in July 2016 to examine ways to prevent and remediate br...

  8. Reliability of the Cardiff Test of basic life support and automated external defibrillation version 3.1.

    PubMed

    Whitfield, Richard H; Newcombe, Robert G; Woollard, Malcolm

    2003-12-01

    The introduction of the European Resuscitation Guidelines (2000) for cardiopulmonary resuscitation (CPR) and automated external defibrillation (AED) prompted the development of an up-to-date and reliable method of assessing the quality of performance of CPR in combination with the use of an AED. The Cardiff Test of basic life support (BLS) and AED version 3.1 was developed to meet this need and uses standardised checklists to retrospectively evaluate performance from analyses of video recordings and data drawn from a laptop computer attached to a training manikin. This paper reports the inter- and intra-observer reliability of this test. Data used to assess reliability were obtained from an investigation of CPR and AED skill acquisition in a lay responder AED training programme. Six observers were recruited to evaluate performance in 33 data sets, repeating their evaluation after a minimum interval of 3 weeks. More than 70% of the 42 variables considered in this study had a kappa score of 0.70 or above for inter-observer reliability or were drawn from computer data and therefore not subject to evaluator variability. 85% of the 42 variables had kappa scores for intra-observer reliability of 0.70 or above or were drawn from computer data. The standard deviations for inter- and intra-observer measures of time to first shock were 11.6 and 7.7 s, respectively. The inter- and intra-observer reliability for the majority of the variables in the Cardiff Test of BLS and AED version 3.1 is satisfactory. However, reliability is less acceptable with respect to shaking when checking for responsiveness, initial check/clearing of the airway, checks for signs of circulation, time to first shock and performance of interventions in the correct sequence. Further research is required to determine if modifications to the method of assessing these variables can increase reliability.

  9. Bridging Services: Drug Abuse, Human Services and the Therapeutic Community. Proceedings of the World Conference of Therapeutic Communities (9th, San Francisco, California, September 1-6, 1985).

    ERIC Educational Resources Information Center

    Acampora, Alfonso P., Ed.; Nebelkopf, Ethan, Ed.

    The World Federation of Therapeutic Communities is an international association of drug treatment centers that use the "Therapeutic Community" (TC) to combat chemical dependency and drug addiction. Their 1985 conference focused on bridging services between the TC and the traditional human service systems. A total of 85 separate papers were…

  10. Bridging Science and Policy: The AGU Science Policy Conference

    NASA Astrophysics Data System (ADS)

    Hankin, E. R.; Uhlenbrock, K.; Landau, E. A.

    2013-12-01

    In recent years, science has become inextricably linked to the political process. As such, it is more important now than ever for science to forge a better relationship with politics, for the health of both science and society. To help meet this need, the American Geophysical Union (AGU) strives to engage its members, shape policy, and inform society about the excitement of Earth and space science and its role in developing solutions for the sustainability of the planet. In June 2013, AGU held its second annual Science Policy Conference in Washington, D.C. The goal of the conference is to provide a new forum for diverse discussions and viewpoints on the challenges and opportunities of science policy, with a focus on applications of Earth and space science that serve local, national, and international communities. The meeting brought together more than 300 scientists, policy makers, industry professionals, members of the press, and other stakeholders to discuss the topics concerning the Arctic, climate change, oceans, energy, technology and infrastructure, and natural hazards science as they relate to challenges impacting society. Sessions such as 'The Water-Energy Nexus,' 'Potential for Megadisasters,' 'The Changing Ocean and Impacts on Human Health,' and 'Drowning and Drought: Agricultural Impacts of Climate Change' are examples of some of the intriguing and timely science policy issues addressed at the conference. The findings from the conference were used to develop a summary report. The report highlights key facts and figures to be used as a resource in discussions with policy makers and other stakeholders regarding the conference topics. This presentation will discuss the goals and outcomes of the conference and how the event represents one of the many ways AGU is approaching its 'Science and Society' priority objective as part of the Union's strategic plan; namely by increasing the effectiveness and recognition of AGU among policy makers as an authoritative

  11. Foreign-Language Pedagogy: Practical Applications to Theoretical Concerns. Selected Papers from the Loyola College Conference Entitled "Bridging Theory and Practice in the Foreign-Language Classroom" (Baltimore, Maryland, October 18-20, 1991).

    ERIC Educational Resources Information Center

    Wieczorek, Joseph A., Ed.

    1993-01-01

    Papers from the conference include the following: "Activites orales et motivation dans l'etude du vocabulaire d'une langue etrangere (Oral Activities and Motivation in the Study of Vocabulary in a Foreign Language)" (M. Guisset); "Bridging High School and College Classes through the Multicultural Approach: The Case of Francophone…

  12. Research on durability of a concrete continuous rigid frame bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing-xian; Ran, Zhi-hong

    2018-05-01

    The research on the durability of concrete structures has also become one of the most important topics for discussion at international academic institutions and conferences. This paper summarizes and reviews the current research on the durability of bridge structure of the bridge at the index relationship between state lifetime and structure durability. According to the actual situation in this paper on a continuous rigid frame bridge China of Yunnan as an example, this bridge was completed and opened to traffic during the first half of the year, a series of tests are carried out for the durability problem. It is found that all the indicators are good within six months after the bridge opened to traffic, but durability issues should be further studied in future monitoring efforts.

  13. PREFACE: 9th Edoardo Amaldi conference on gravitational waves (Amaldi 9) and the 2011 Numerical Relativity - Data Analysis meeting (NRDA 2011)

    NASA Astrophysics Data System (ADS)

    Hannam, Mark; Sutton, Patrick; Hild, Stefan; Van Den Broeck, Chris

    2012-06-01

    The Ninth Edoardo Amaldi conference on gravitational waves (Amaldi 9) and the 2011 Numerical Relativity - Data Analysis meeting (NRDA 2011) were held on July 10-15, 2011 in Cardiff, UK. The summer of 2011 marked the beginning of a crucial time for the field of gravitational-wave astronomy. After the successful completion of long-duration data taking, the initial LIGO and Virgo detectors were shut down and the era of first-generation laser interferometric gravitational-wave detectors came to an end. With the analysis of the last set of first-generation data approaching completion, the field now faces the challenge of preparing for the era of second-generation detectors, and, hopefully, the regular detection of gravitational waves. The first of the advanced detectors should begin operation in 2014, but the intervening years are far from a time of sitting and waiting. This will be a hectic time for experimenters, who have to fight the limits of current technology to make their theoretical noise curves a reality. During Amaldi 9 we were led through the upgrades to advanced detectors, and the challenges that the experimenters face. We also heard about proposals for going yet further with third-generation and space-based detectors. This is also a crucial time for theoretical work. With the increased sensitivity of advanced detectors, we hope to not only make the first detections of gravitational waves, but to learn about their sources, and interpret what this means for astrophysics. We need more complete source modelling, more sophisticated and efficient search pipelines and parameter estimation tools, as well as a greater understanding of what we can learn about the universe. Amaldi 9 included a number of talks on the status of these efforts, and the open questions that will be the focus in the coming years. Sunday July 10th was devoted entirely to NRDA 2011. In recent years the NRDA meetings have brought together numerical relativists who model compact-binary sources

  14. Role of the Conserved Disulfide Bridge in Class A Carbapenemases*

    PubMed Central

    Smith, Clyde A.; Nossoni, Zahra; Toth, Marta; Stewart, Nichole K.; Frase, Hilary; Vakulenko, Sergei B.

    2016-01-01

    Some members of the class A β-lactamase family are capable of conferring resistance to the last resort antibiotics, carbapenems. A unique structural feature of these clinically important enzymes, collectively referred to as class A carbapenemases, is a disulfide bridge between invariant Cys69 and Cys238 residues. It was proposed that this conserved disulfide bridge is responsible for their carbapenemase activity, but this has not yet been validated. Here we show that disruption of the disulfide bridge in the GES-5 carbapenemase by the C69G substitution results in only minor decreases in the conferred levels of resistance to the carbapenem imipenem and other β-lactams. Kinetic and circular dichroism experiments with C69G-GES-5 demonstrate that this small drop in antibiotic resistance is due to a decline in the enzyme activity caused by a marginal loss of its thermal stability. The atomic resolution crystal structure of C69G-GES-5 shows that two domains of this disulfide bridge-deficient enzyme are held together by an intensive hydrogen-bonding network. As a result, the protein architecture and imipenem binding mode remain unchanged. In contrast, the corresponding hydrogen-bonding networks in NMCA, SFC-1, and SME-1 carbapenemases are less intensive, and as a consequence, disruption of the disulfide bridge in these enzymes destabilizes them, which causes arrest of bacterial growth. Our results demonstrate that the disulfide bridge is essential for stability but does not play a direct role in the carbapenemase activity of the GES family of β-lactamases. This would likely apply to all other class A carbapenemases given the high degree of their structural similarity. PMID:27590339

  15. Dynamics and statics of nonaxisymmetric liquid bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnick, Andy; Zhang, Yiqiang; Fedoseyev, A.

    1994-01-01

    We finished the construction of the experimental apparatus and the design and testing of some of the visualization and data acquisition techniques. Experimental work focused on three areas: force measurements, loss of stability to nonaxisymmetric bridges, and vibration behavior. The experimental work is summarized in section 2. Selected results from our force measurement experiments are outlined in section 3. In addition we worked on the theory of the dynamic stability of axisymmetric bridges and undertook numerical simulation of the effects of inclined gravity vectors on the minimum volume stability limit for static bridges. The results and status of our theoretical work and numerical simulation are described in section 4. Papers published and in preparation, conference presentations, etc., are described in section 5. Work planned for the third year is discussed in section 6. References cited in the report are listed in section 7.

  16. Bridging basic science and clinical research: the EASL Monothematic Conference on Translational Research in Viral Hepatitis.

    PubMed

    Boettler, Tobias; Moradpour, Darius; Thimme, Robert; Zoulim, Fabien

    2014-09-01

    The EASL Monothematic Conference on Translational Research in Viral Hepatitis brought together a group of leading scientists and clinicians working on both, basic and clinical aspects of viral hepatitis, thereby building bridges from bench to bedside. This report recapitulates the presentations and discussions at the conference held in Lyon, France on November 29-30, 2013. In recent years, great advances have been made in the field of viral hepatitis, particularly in hepatitis C virus (HCV) infection. The identification of IL28B genetic polymorphisms as a major determinant for spontaneous and treatment-induced HCV clearance was a seminal discovery. Currently, hepatologists are at the doorstep of even greater advances, with the advent of a wealth of directly acting antivirals (DAAs) against HCV. Indeed, promising results have accumulated over the last months and few years, showing sustained virological response (SVR) rates of up to 100% with interferon-free DAA combination therapies. Thus, less than 25 years after its identification, HCV infection may soon be curable in the vast majority of patients, highlighting the great success of HCV research over the last decades. However, viral hepatitis and its clinical complications such as liver cirrhosis and hepatocellular carcinoma (HCC) remain major global challenges. New therapeutic strategies to tackle hepatitis B virus (HBV) and hepatitis D virus (HDV) infection are needed, as current therapies have undeniable limitations. Nucleoside/nucleotide analogues (NUC) can efficiently control HBV replication and reduce or even reverse liver damage. However, these drugs have to be given for indefinite periods in most patients to maintain virological and biochemical responses. Although sustained responses off treatment can be achieved by treatment with (pegylated) interferon-α, only about 10-30% of patients effectively resolve chronic hepatitis B. It was the goal of this conference to review the progress made over the last

  17. The Cardiff Acne Disability Index (CADI): linguistic and cultural validation in Serbian.

    PubMed

    Jankovic, Slavenka; Vukicevic, Jelica; Djordjevic, Sanja; Jankovic, Janko; Marinkovic, Jelena; Basra, Mohammad K A

    2013-02-01

    The aims of this study were to translate the Cardiff Acne Disability Index (CADI) into Serbian and to assess its validity and reliability in Serbian acne patients. The CADI was translated and linguistically validated into Serbian according to published guidelines. This version of CADI, along with the Serbian version of Children's Dermatology Life Quality Index (CDLQI) and a short demographic questionnaire, was administrated to a cohort of secondary school pupils. The Global Acne Grading Score was used to measure the clinical severity of acne. The internal consistency reliability of the Serbian version of CADI was assessed by Cronbach's alpha coefficient while its concurrent validity was assessed by Spearman's correlation coefficient. Construct validity was examined by factor analysis. A total of 465 pupils completed questionnaires. Self-reported acne was present in 76% of pupils (353/465). The Serbian version of CADI showed high internal consistency reliability (Cronbach's alpha coefficient = 0.79). The mean item-total correlation coefficient was 0.74 with a range of 0.53-0.81. The concurrent validity of the scale was supported by a moderate but highly significant correlation with the CDLQI (Spearman's rho = 0.66; P < 0.001). Factor analysis revealed the presence of two dimensions underlying the factor structure of the scale. The Serbian version of the CADI is a reliable, valid, and valuable tool for assessing the impact of acne on the quality of life of Serbian-speaking patients.

  18. Role of the Conserved Disulfide Bridge in Class A Carbapenemases.

    PubMed

    Smith, Clyde A; Nossoni, Zahra; Toth, Marta; Stewart, Nichole K; Frase, Hilary; Vakulenko, Sergei B

    2016-10-14

    Some members of the class A β-lactamase family are capable of conferring resistance to the last resort antibiotics, carbapenems. A unique structural feature of these clinically important enzymes, collectively referred to as class A carbapenemases, is a disulfide bridge between invariant Cys 69 and Cys 238 residues. It was proposed that this conserved disulfide bridge is responsible for their carbapenemase activity, but this has not yet been validated. Here we show that disruption of the disulfide bridge in the GES-5 carbapenemase by the C69G substitution results in only minor decreases in the conferred levels of resistance to the carbapenem imipenem and other β-lactams. Kinetic and circular dichroism experiments with C69G-GES-5 demonstrate that this small drop in antibiotic resistance is due to a decline in the enzyme activity caused by a marginal loss of its thermal stability. The atomic resolution crystal structure of C69G-GES-5 shows that two domains of this disulfide bridge-deficient enzyme are held together by an intensive hydrogen-bonding network. As a result, the protein architecture and imipenem binding mode remain unchanged. In contrast, the corresponding hydrogen-bonding networks in NMCA, SFC-1, and SME-1 carbapenemases are less intensive, and as a consequence, disruption of the disulfide bridge in these enzymes destabilizes them, which causes arrest of bacterial growth. Our results demonstrate that the disulfide bridge is essential for stability but does not play a direct role in the carbapenemase activity of the GES family of β-lactamases. This would likely apply to all other class A carbapenemases given the high degree of their structural similarity. © 2016 by The American Society for Biochemistry and Molecular Biology, Inc.

  19. Special Issue of Inhalation Toxicology for Air Pollution and Health: Bridging the Gap from Sources-to-Health Outcomes

    EPA Science Inventory

    Pollution and Health: Bridging the Gap from Sources to Health Outcomes”, an international specialty conference by the American Association for Aerosol Research (AAAR) (http://aaar.2010specialty.org/), provided one such opportunity for these interactions. The Conference was organi...

  20. Three Bridge Fryer's Ford Bridge, Nimrod Bridge, and Ward's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Three Bridge - Fryer's Ford Bridge, Nimrod Bridge, and Ward's Crossing Bridge - Fryer's Ford Bridge, Spanning East Fork of Point Remove Creek at Fryer Bridge Road (CR 67), Solgohachia, Conway County, AR

  1. Inaugural AGU Science Policy Conference

    NASA Astrophysics Data System (ADS)

    Uhlenbrock, Kristan

    2012-01-01

    AGU will present its inaugural Science Policy Conference, 30 April to 3 May 2012, at the Ronald Reagan Building and International Trade Center, located in downtown Washington, D. C. This conference will bring together leading scientists, policy makers, industry professionals, press, and other stakeholders to discuss natural hazards, natural resources, oceans, and Arctic science and the role these sciences play in serving communities. To bridge the science and policy fields, AGU plans to host this conference every 2 years and focus on the applications of Earth and space sciences to serve local and national communities. "Our nation faces a myriad of challenges such as the sustainability of our natural resources, current and future energy needs, and the ability to mitigate and adapt to natural and manmade hazards," said Michael McPhaden, president of AGU. "It is essential that policies to address these challenges be built on a solid foundation of credible scientific knowledge."

  2. Proceedings 5th International Conference on Optics of Surfaces and Interfaces (OSI-V), Léon, México 26-30 May 2003: physica status solidi (c) - conferences and critical reviews

    NASA Astrophysics Data System (ADS)

    Mendoza, Bernardo S.

    2003-05-01

    physica status solidi (c) conferences and critical reviews publishes conference proceedings, ranging from large international meetings to specialized topical workshops as well as collections of topical reviews on various areas of current solid state physics research. The objective of "Optics of Surfaces and Interfaces" (OSI-V) is to bridge the gap between basic and applied science. Apart from recent advances in theoretical modeling and experimental research, special attention is given to novel techniques of optical spectroscopy at interfaces.

  3. eHealth and IMIA's Strategic Planning Process - IMIA conference introductory address.

    PubMed

    Murray, Peter; Haux, Reinhold; Lorenzi, Nancy

    2008-01-01

    The International Medical Informatics Association (IMIA) is the only organization in health and biomedical informatics which is fully international in scope, bridging the academic, health practice, education, and health industry worlds through conferences, working groups, special interest groups and publications. Authored by the IMIA Interim Vice President for Strategic Planning Implementation and co-authored by the current IMIA President and the IMIA Past-President, the intention of this paper is to introduce IMIA's current strategic planning process and to set this process in relation to 'eHealth: Combining Health Telematics, Telemedicine, Biomedical Engineering and Bioinformatics to the Edge', the theme of this conference. From the viewpoint of an international organization such as IMIA, an eHealth strategy needs to be considered in a comprehensive way, including broadly stimulating high-quality health and biomedical informatics research and education, as well as providing support to bridging outcomes towards a new practice of health care in a changing world.

  4. Roy D. Bridges Bridge

    NASA Image and Video Library

    2003-08-06

    From left, incoming KSC Director James W. Kennedy looks on as departing KSC Director Roy D. Bridges Jr. shakes hands with the 45th Space Wing Commander Brig. Gen. J. Gregory Pavlovich. The occasion is the unveiling of the new sign on the NASA Causeway naming the bridge for Bridges who is leaving KSC to become the director of NASA's Langley Research Center, Hampton, Va. The bridge spans the Banana River on the NASA Causeway and connects Kennedy Space Center and Cape Canaveral Air Force Station.

  5. Electrical actuation technology bridging, volume 1

    NASA Astrophysics Data System (ADS)

    Hammond, Monica S.; Doane, George B., III

    1993-01-01

    This document contains the proceedings from the conference. The workshop addressed key technologies bridging the entire field of electrical actuation including systems methodology, control electronics, power source systems, reliability, maintainability, and vehicle health management with special emphasis on thrust vector control (TVC) applications on NASA launch vehicles. Speakers were drawn primarily from industry with participation from universities and government. In addition, prototype hardware demonstrations were held at the MSFC Propulsion Laboratory each afternoon. Splinter sessions held on the final day afforded the opportunity to discuss key issues and to provide overall recommendations. Presentations are included in this document.

  6. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  7. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  8. Building a Bridge or Digging a Pipeline? Clinical Data Mining in Evidence-Informed Knowledge Building

    ERIC Educational Resources Information Center

    Epstein, Irwin

    2015-01-01

    Challenging the "bridge metaphor" theme of this conference, this article contends that current practice-research integration strategies are more like research-to-practice "pipelines." The purpose of this article is to demonstrate the potential of clinical data-mining studies conducted by practitioners, practitioner-oriented PhD…

  9. Biomedical informatics publications: a global perspective: part I: conferences.

    PubMed

    Maojo, V; García-Remesal, M; Bielza, C; Crespo, J; Perez-Rey, D; Kulikowski, C

    2012-01-01

    In the past decade, Medical Informatics (MI) and Bioinformatics (BI) have converged towards a new discipline, called Biomedical Informatics (BMI) bridging informatics methods across the spectrum from genomic research to personalized medicine and global healthcare. This convergence still raises challenging research questions which are being addressed by researchers internationally, which in turn raises the question of how biomedical informatics publications reflect the contributions from around the world in documenting the research. To analyse the worldwide participation of biomedical informatics researchers from professional groups and societies in the best-known scientific conferences in the field. The analysis is focused on their geographical affiliation, but also includes other features, such as the impact and recognition of the conferences. We manually collected data about authors of papers presented at three major MI conferences: Medinfo, MIE and the AMIA symposium. In addition, we collected data from a BI conference, ISMB, as a comparison. Finally, we analyzed the impact and recognition of these conferences within their scientific contexts. Data indicate a predominance of local authors at the regional conferences (AMIA and MIE), whereas other conferences with a world-wide scope (Medinfo and ISMB) had broader participation. Our analysis shows that the influence of these conferences beyond the discipline remains somewhat limited. Our results suggest that for BMI to be recognized as a broad discipline, both in the geographical and scientific sense, it will need to extend the scope of collaborations and their interdisciplinary impacts worldwide.

  10. PREFACE: The 6th European Conference on Applied Superconductivity (EUCAS 2003)

    NASA Astrophysics Data System (ADS)

    Vaglio, Ruggero; Donaldson, Gordon

    2004-05-01

    This special issue of Superconductor Science and Technology contains papers presented at the 6th European Conference on Applied Superconductivity (EUCAS), which was held in Sorrento, Italy, 14--18 September 2003. This important biennial event followed previous successful meetings held in Gottingen, Germany; Edinburgh, Scotland; Eindhoven, the Netherlands; Sitges (Barcelona), Spain; and Copenhagen, Denmark. Following tradition, this EUCAS conference focused on the role of superconductivity in bridging various aspects of research with a variety of concrete advanced applications. EUCAS 2003 attracted about 1000 participants from all around the world with large participation from non-European countries. This conference benefited the worldwide superconductivity community tremendously as scientists operating internationally were able to share their knowledge and experience with one another. We are grateful to all those who submitted papers to the Conference Proceedings, which will be published in an Institute of Physics Conference Series, and also to those who contributed to this special issue. Unfortunately we could not consider every one of the large number of papers submitted to this issue and we express our regret to those whose work could not be included.

  11. Research Teaching and Learning in Higher Education. Staff and Educational Development Series.

    ERIC Educational Resources Information Center

    Smith, Brenda, Ed.; Brown, Sally, Ed.

    This collection of 18 essays are based on sessions and keynote speeches at the Staff and Educational Development Association (SEDA) Conference held at Dyffrwn House, Cardiff (Wales) in November 1993. They represent the reworked and distilled thoughts of the presenters after they had had the experience of leading a workshop on a related topic. The…

  12. Cultural Adaptation of the Cardiff Acne Disability Index to a Hindi Speaking Population: A Pilot Study.

    PubMed

    Gupta, Aayush; Sharma, Yugal K; Dash, K; Verma, Sampurna

    2015-01-01

    Acne vulgaris is known to impair many aspects of the quality of life (QoL) of its patients. To translate the Cardiff Acne Disability Index (CADI) from English into Hindi and to assess its validity and reliability in Hindi speaking patients with acne from India. Hindi version of CADI, translated and linguistically validated as per published international guidelines, along with a previously translated Hindi version of dermatology life quality index (DLQI) and a demographic questionnaire were administered to acne patients. The internal consistency reliability of the Hindi version of CADI and its concurrent validity were assessed by Cronbach's alpha co-efficient and Spearman's correlation co-efficient respectively. Construct validity was examined by factor analysis. Statistical analysis was carried out using the Statistical Package for the Social Sciences (SPSS) version 20 (SPSS Inc., Chicago, IL, USA) for Windows. One hundred Hindi speaking patients with various grades of acne participated in the study. Hindi version of CADI showed high internal consistency reliability (Cronbach's alpha co-efficient = 0.722). Mean item-to-total correlation co-efficient ranged from 0.502 to 0.760. Concurrent validity of the scale was supported by a significant correlation with the Hindi DLQI. Factor analysis revealed the presence of two dimensions underlying the factor structure of the scale. Hindi CADI is equivalent to the original English version and constitutes a reliable and valid tool for clinical assessment of the impact of acne on QoL.

  13. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  14. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  15. BridgePBEE | BridgePBEE

    Science.gov Websites

    jacking Item 22: Bridge removal (column) Item 23: Bridge removal (portion) Item 24: Approach slab removal for: Search Menu Log in Register PEER Center - 325 Davis Hall, University of California, Berkeley, CA

  16. Regional conferences--a capacity-building mandate: report on CRCP2011-Building Bridges and Building a Regional Structure.

    PubMed

    Thompson, Ava; Bernal, Guillermo; Dudley-Grant, Rita; Govia, Ishtar; Nicolas, Guerda; Bullock, Merry; Gauthier, Janel

    2013-01-01

    The Caribbean Regional Conference of Psychology was held in Nassau, The Bahamas, from 15 to 18 November 2011, under the auspices of the International Association of Applied Psychology (IAAP), the International Union of Psychological Science (IUPsyS), and the International Association for Cross-Cultural Psychology (IACCP). The conference was hosted by the Bahamas Psychological Association, and organized by a committee chaired by Dr Ava Thompson, College of the Bahamas. The CRCP2011 attracted over 400 participants from 37 countries, including 20 nations/territories in the Caribbean. A broad scientific program, organized around six conference themes, addressed strengths and challenges to psychology in the region; the current state of psychological research, assessment, and intervention; historical, cultural, and language influences; and links between Caribbean and global models. Conference outcomes included planning for a series of publications to expand on conference themes and presentations, as well as establishment of a steering group to launch a regional organization to support the science and practice of psychology in the Caribbean.

  17. Myocardial Bridge

    MedlinePlus

    ... Center > Myocardial Bridge Menu Topics Topics FAQs Myocardial Bridge En español Your heart is made of muscle, ... surface of the heart. What is a myocardial bridge? A myocardial bridge is a band of heart ...

  18. International Conference on Intelligent Systems for Molecular Biology (ISMB)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldberg, Debra; Hibbs, Matthew; Kall, Lukas

    The Intelligent Systems for Molecular Biology (ISMB) conference has provided a general forum for disseminating the latest developments in bioinformatics on an annual basis for the past 13 years. ISMB is a multidisciplinary conference that brings together scientists from computer science, molecular biology, mathematics and statistics. The goal of the ISMB meeting is to bring together biologists and computational scientists in a focus on actual biological problems, i.e., not simply theoretical calculations. The combined focus on "intelligent systems" and actual biological data makes ISMB a unique and highly important meeting, and 13 years of experience in holding the conference hasmore » resulted in a consistently well organized, well attended, and highly respected annual conference. The ISMB 2005 meeting was held June 25-29, 2005 at the Renaissance Center in Detroit, Michigan. The meeting attracted over 1,730 attendees. The science presented was exceptional, and in the course of the five-day meeting, 56 scientific papers, 710 posters, 47 Oral Abstracts, 76 Software demonstrations, and 14 tutorials were presented. The attendees represented a broad spectrum of backgrounds with 7% from commercial companies, over 28% qualifying for student registration, and 41 countries were represented at the conference, emphasizing its important international aspect. The ISMB conference is especially important because the cultures of computer science and biology are so disparate. ISMB, as a full-scale technical conference with refereed proceedings that have been indexed by both MEDLINE and Current Contents since 1996, bridges this cultural gap.« less

  19. Conference room 211, adjacent to commander's quarters, with vault door ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Conference room 211, adjacent to commander's quarters, with vault door at right. Projection area at center is equipped with automatic security drapes. Projection room uses a 45 degree mirror to reflect the image onto the frosted glass screen. Door on far left leads to display area senior battle staff viewing bridge, and the commander's quarters - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  20. Hirschsprung's disease: A bridge for science and surgery.

    PubMed

    Tam, Paul K H

    2016-01-01

    Understanding the true nature of the disease provided the basis for appropriate surgery for Hirschsprung's disease some 60 years ago. Nevertheless, surgical outcome remains unsatisfactory. Advances in diagnosis and treatment will depend on the elucidation of the pathogenesis and disease heterogeneity. This lecture outlines the author's attempt in the past 30 years to bridge some of the gaps of knowledge in Hirschsprung's disease. Studies of human fetal gut and aganglionic gut gave insight into the complexity of the human enteric nervous system, but the more fruitful studies came from genetic studies in which disease-causing genes were discovered, and the importance of noncoding mutations conferring disease susceptibility was unraveled. Animal models and pluripotent stem cell studies allowed elucidation of the interacting gene-cell-microenvironment signaling pathways for neural crest proliferation, migration, and differentiation. Hirschsprung's disease has been a bridge for science and surgery. An integrative approach could provide breakthroughs in the diagnosis and treatment strategies of this complex condition, leading to improved outcome. Copyright © 2016 Elsevier Inc. All rights reserved.

  1. PREFACE: 11th International Conference on Damage Assessment of Structures (DAMAS 2015)

    NASA Astrophysics Data System (ADS)

    Wahab, M. A.

    2015-07-01

    This volume contains the proceedings of the 11th International Conference on Damage Assessment of Structures (DAMAS) 2015. DAMAS has a long history of almost 20 years. The first DAMAS conference took place in 1995 (Pescara, Italy), followed by a biannual meeting in 1997 (Sheffield, UK), 1999 (Dublin, Ireland), 2001 (Cardiff, UK), 2003 (Southampton, UK), 2005 (Gdansk, Poland), 2007 (Torino, Italy), 2009 (Beijing, China), 2011 (Oxford, UK) and 2013 (Dublin, Ireland). The eleventh edition of DAMAS conference series, DAMAS 2015, is hosted by Ghent University, Belgium, and is held at the congress center Het Pand in Ghent city. Ghent is the capital and the largest city of the East Flanders province of the Flemish region of Belgium. Het Pand is the culture and congress center of Ghent University and is a historical monument. The conference is established as a major international forum for research topics relevant to damage assessment of engineering structures and systems including numerical simulations, signal processing of sensor measurements and theoretical techniques as well as experimental case studies. The presentations of DAMAS 2015 are divided into 6 main sessions, namely 1) Structural Health and Condition Monitoring, 2) Damage in Civil Engineering, 3) Damage in Machineries, 4) Damage in Composite Materials, 5) Sensing and Sensors and 6) Signal Processing. The organising committee is grateful to keynote speakers; Professor Guido De Roeck, Head of Structural Mechanics Division, KULeuven, Belgium, for his keynote lecture entitled 'Structural Health Monitoring: highlights and challenges', Professor Weidong Zhu, Department of Mechanical Engineering, University of Maryland, USA, for his keynote lecture entitled 'Vibration-based Structural Damage Detection: Theory and Applications' and Professor Wieslaw Ostachowicz, Head of the Laboratory of Active Materials and Smart Structures, Polish Academy of Sciences, Poland, for his keynote lecture entitled 'Damage Assessment and

  2. An improved bridge safety index for narrow bridges.

    DOT National Transportation Integrated Search

    1983-08-01

    In this report, a new bridge safety index is developed based upon an extensive : statistical study of accident data on 78 bridges. A total of 655 accidents : were recorded at these bridges over the six-year period between 1974 and 1979. : Cluster ana...

  3. The undergraduate preparation of dentists: Confidence levels of final year dental students at the School of Dentistry in Cardiff.

    PubMed

    Gilmour, A S M; Welply, A; Cowpe, J G; Bullock, A D; Jones, R J

    2016-09-23

    Objective To investigate the self-reported confidence and preparedness of final year undergraduate students in undertaking a range of clinical procedures.Methods A questionnaire was distributed to final year dental students at Cardiff University, six months prior to graduation. Respondents rated their confidence in undertaking 39 clinical procedures using a 5-point scale (1 = can undertake on own with confidence, 5 = unable to undertake). Students also responded yes/no to experiencing four difficulties and to three statements about general preparedness.Results 71% (N = 51) responded of which 55% (N = 28) were female. Over half reported being 'anxious that the supervisor was not helping enough' (57%) and 'relying heavily on supervisor for help' (53%). Eighty percent 'felt unprepared for the clinical work presented' and gender differences were most notable here (male: 65% N = 33; females: 93% N = 47). Mean confidence scores were calculated for each clinical procedure (1 = lowest; 5 = highest). Confidence was highest in performing 'simple scale' and 'fissure sealant' (mean-score = 5). Lowest scores were reported for 'surgical extractions involving a flap (mean-score = 2.28)', 'simple surgical procedures' (mean-score = 2.58) and the 'design/fit/adjustment of orthodontic appliances' (mean-score = 2.88).Conclusions As expected complex procedures that were least practised scored the lowest in overall mean confidence. Gender differences were noted in self-reported confidence for carrying out treatment unsupervised and feeling unprepared for clinical work.

  4. 28. BRIDGE NO. 9 APRON AND BRIDGE HINGE JOINT AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. BRIDGE NO. 9 APRON AND BRIDGE HINGE JOINT AND BRIDGE SUSPENSION SYSTEM SHOWING EYEBAR AND CABLE CONNECTIONS. LOOKING WEST. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  5. Bridge permeameter

    DOEpatents

    Graf, Darin C.; Warpinski, Norman R.

    1996-01-01

    A system for single-phase, steady-state permeability measurements of porous rock utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors.

  6. 29. BRIDGE NO. 13 APRON AND BRIDGE HINGE JOINT AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. BRIDGE NO. 13 APRON AND BRIDGE HINGE JOINT AND BRIDGE SUSPENSION SYSTEM (OLDER STYLE) SHOWING EYEBAR AND CABLE CONNECTIONS. LOOKING WEST. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  7. 5. View of Clark Fork Vehicle Bridge facing east. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. View of Clark Fork Vehicle Bridge facing east. Bridge from south shore of Clark Fork River-southernmost span. 1900-era Northern Pacific Railway Bridge in background. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  8. Methods applied in cost-effectiveness models for treatment strategies in type 2 diabetes mellitus and their use in Health Technology Assessments: a systematic review of the literature from 2008 to 2013.

    PubMed

    Charokopou, M; Sabater, F J; Townsend, R; Roudaut, M; McEwan, P; Verheggen, B G

    2016-01-01

    To identify and compare health-economic models that were developed to evaluate the cost-effectiveness of treatments for type 2 diabetes mellitus (T2DM), and their use within Health Technology Assessments (HTAs). In total, six commonly used databases were searched for articles published between October 2008 and January 2013, using a protocolized search strategy and inclusion criteria. The websites of HTA organizations in nine countries, and proceedings from five relevant conferences, were also reviewed. The identified new health-economic models were qualitatively assessed using six criteria that were developed based on technical components, and characteristics related to the disease or the treatments being assessed. Finally, the number of times the models were applied within HTA reports, published literature, and/or major conferences was determined. Thirteen new models were identified and reviewed in depth. Most of these were based on identical key data sources, and applied a similar model structure, either using Markov modeling or microsimulation techniques. The UKPDS equations and panel regressions were frequently used to estimate the occurrence of diabetes-related complications and the probability of developing risk factors in the long term. The qualitative assessment demonstrated that the CARDIFF, Sheffield T2DM and ECHO T2DM models seem technically equipped to appropriately assess the long-term health-economic consequences of chronic treatments for patients with T2DM. It was observed that the CORE model is the most widely described in literature and conferences, and the most often applied model within HTA submissions, followed by the CARDIFF and UKPDS models. This research provides an overview of T2DM models that were developed between 2008 and January 2013. The outcomes of the qualitative assessments, combined with frequent use in local reimbursement decisions, prove the applicability of the CORE, CARDIFF and UKPDS models to address decision problems related

  9. The contribution of geology and groundwater studies to city-scale ground heat network strategies: A case study from Cardiff, UK

    NASA Astrophysics Data System (ADS)

    Boon, David; Farr, Gareth; Patton, Ashley; Kendall, Rhian; James, Laura; Abesser, Corinna; Busby, Jonathan; Schofield, David; White, Debbie; Gooddy, Daren; James, David; Williams, Bernie; Tucker, David; Knowles, Steve; Harcombe, Gareth

    2016-04-01

    The development of integrated heat network strategies involving exploitation of the shallow subsurface requires knowledge of ground conditions at the feasibility stage, and throughout the life of the system. We describe an approach to the assessment of ground constraints and energy opportunities in data-rich urban areas. Geological and hydrogeological investigations have formed a core component of the strategy development for sustainable thermal use of the subsurface in Cardiff, UK. We present findings from a 12 month project titled 'Ground Heat Network at a City Scale', which was co-funded by NERC/BGS and the UK Government through the InnovateUK Energy Catalyst grant in 2015-16. The project examined the technical feasibility of extracting low grade waste heat from a shallow gravel aquifer using a cluster of open loop ground source heat pumps. Heat demand mapping was carried out separately. The ground condition assessment approach involved the following steps: (1) city-wide baseline groundwater temperature mapping in 2014 with seasonal monitoring for at least 12 months prior to heat pump installation (Patton et al 2015); (2) desk top and field-based investigation of the aquifer system to determine groundwater levels, likely flow directions, sustainable pumping yields, water chemistry, and boundary conditions; (3) creation of a 3D geological framework model with physical property testing and model attribution; (4) use steps 1-3 to develop conceptual ground models and production of maps and GIS data layers to support scenario planning, and initial heat network concept designs; (5) heat flow modelling in FEFLOW software to analyse sustainability and predict potential thermal breakthrough in higher risk areas; (6) installation of a shallow open loop GSHP research observatory with real-time monitoring of groundwater bodies to provide data for heat flow model validation and feedback for system control. In conclusion, early ground condition modelling and subsurface

  10. Bridge permeameter

    DOEpatents

    Graf, D.C.; Warpinski, N.R.

    1996-08-13

    A system is described for single-phase, steady-state permeability measurements of porous rock which utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors. 8 figs.

  11. Bridge permeameter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graf, D.C.; Warpinski, N.R.

    A system is described for single-phase, steady-state permeability measurements of porous rock which utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors. 8 figs.

  12. Long-term bridge performance high priority bridge performance issues.

    DOT National Transportation Integrated Search

    2014-10-01

    Bridge performance is a multifaceted issue involving performance of materials and protective systems, : performance of individual components of the bridge, and performance of the structural system as a whole. The : Long-Term Bridge Performance (LTBP)...

  13. Prospects for Technical and Vocational Education and Training (TVET) in Nigeria: Bridging the Gap between Policy Document and Implementation

    ERIC Educational Resources Information Center

    Akanbi, Grace Oluremi

    2017-01-01

    This paper discusses the prospects technical and vocational education and training (TVET) in Nigeria through bridging the gap between the policy document and practice. At the 1969 National Curriculum Conference and the eventual emergence of the National Policy on Education (NPE) in 1977, TVET was given prominence but, unfortunately, in theory…

  14. OVERVIEW OF BRIDGES WITH WAIKELE CANAL BRIDGE IN CENTER, OR&L ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF BRIDGES WITH WAIKELE CANAL BRIDGE IN CENTER, OR&L BRIDGE IN BACKGROUND. SHOWING THE EARTHEN INCLINE THAT RAISES FARRINGTON HIGHWAY OVER THE FORMER OR&L TRACKS. NOTE THE 1963 WESTBOUND BRIDGE IN THE FOREGROUND. VIEW FACING EAST. - Waikele Canal Bridge and Highway Overpass, Farrington Highway and Waikele Stream, Waipahu, Honolulu County, HI

  15. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  16. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  17. Kinetic bridges.

    DOT National Transportation Integrated Search

    1980-01-01

    This report on kinetic bridges is essentially a state-of-the-art study on two types of bridges whose location or physical characteristics are designed to be time dependent. The first type, called a "relocatable bridge", is essentially for use as a te...

  18. Bridge health monitoring metrics : updating the bridge deficiency algorithm.

    DOT National Transportation Integrated Search

    2009-10-01

    As part of its bridge management system, the Alabama Department of Transportation (ALDOT) must decide how best to spend its bridge replacement funds. In making these decisions, ALDOT managers currently use a deficiency algorithm to rank bridges that ...

  19. Guardrails for use on historic bridges: volume 2--bridge deck overhang design.

    DOT National Transportation Integrated Search

    2016-11-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...

  20. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  1. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  2. 1. View of bridge from Interstate 195 (Washington Bridge) looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. View of bridge from Interstate 195 (Washington Bridge) looking southwest - India Point Railroad Bridge, Spanning Seekonk River between Providence & East Providence, Providence, Providence County, RI

  3. Field performance of timber bridges. 7, Connell Lake stress-laminated deck bridge

    Treesearch

    L. E. Hislop; M. A. Ritter

    The Connell Lake bridge was constructed in early 1991 on the Tongass National Forest, Alaska, as a demonstration bridge under the Timber Bridge Initiative. The bridge is a stress-laminated deck structure with an approximate 36-ft length and 18-ft width and is the first known stress-laminated timber bridge constructed in Alaska. Performance of the bridge was monitored...

  4. GOETHALS BRIDGE FROM NORTH SIDE OVER ARTHUR KILL. RAILROAD BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GOETHALS BRIDGE FROM NORTH SIDE OVER ARTHUR KILL. RAILROAD BRIDGE IN FOREGROUND - Goethals Bridge, Spanning Arthur Kill from New Jersey to Staten Island, Staten Island (subdivision), Richmond County, NY

  5. LOOKING WEST, BETWEEN READING DEPOT BRIDGE AND SKEW ARCH BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOOKING WEST, BETWEEN READING DEPOT BRIDGE AND SKEW ARCH BRIDGE (HAER No. PA-116). - Philadelphia & Reading Railroad, Reading Depot Bridge, North Sixth Street at Woodward Street, Reading, Berks County, PA

  6. Plans: Poop Deck, Boat Deck, Housetop, Bridge Deck, Upper Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Plans: Poop Deck, Boat Deck, Housetop, Bridge Deck, Upper Bridge Deck, Navigating Bridge, Forecastle Deck, Upper Deck, Second Deck and Hold - Saugatuck, James River Reserve Fleet, Newport News, Newport News, VA

  7. 1. VIEW OF SWING BRIDGE FROM KEDZIE AVENUE BRIDGE, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SWING BRIDGE FROM KEDZIE AVENUE BRIDGE, LOOKING EAST. - Chicago, Madison & Northern Railroad, Sanitary & Ship Canal Bridge, Spanning Sanitary & Ship Canal, east of Kedzie Avenue, Chicago, Cook County, IL

  8. 3. View of Clark Fork Vehicle Bridge facing southwest. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. View of Clark Fork Vehicle Bridge facing southwest. Bridge from north shore of Clark Fork River. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  9. OVERVIEW OF BRIDGES WITH OR&L BRIDGE IN CENTER, WAIKELE CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF BRIDGES WITH OR&L BRIDGE IN CENTER, WAIKELE CANAL BRIDGE IN BACKGROUND. SHOWING THE EARTHEN INCLINE THAT RAISES FARRINGTON HIGHWAY OVER THE FORMER OR&L TRACKS. VIEW FACING SOUTHWEST. - Waikele Canal Bridge and Highway Overpass, Farrington Highway and Waikele Stream, Waipahu, Honolulu County, HI

  10. Dedication of the Early Space Education and Conference Center at KSC Visitor Complex.

    NASA Technical Reports Server (NTRS)

    2000-01-01

    At the opening of the Early Space Education and Conference Center, KSC Visitor Complex, the facility is dedicated to Dr.Kurt H. Debus, who served as the first director of the John F. Kennedy Space Center, 1962-1974. Attending the dedication are (left to right) Delaware North President Rick Abramson, Ute Debus, Center Director Roy Bridges and Sigi Debus Northcutt. Ute and Sigi are the daughters of Dr. Debus.

  11. 4. View of Clark Fork Vehicle Bridge facing northeast. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. View of Clark Fork Vehicle Bridge facing northeast. Bridge from south shoreof Clark Fork River showing 4 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  12. 2. View of Clark Fork Vehicle Bridge facing northeast. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. View of Clark Fork Vehicle Bridge facing northeast. Bridge from south shore of Clark Fork River showing 4 1/2 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  13. 7. View of Clark Fork Vehicle Bridge facing northwest. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. View of Clark Fork Vehicle Bridge facing northwest. Bridge from south shore of Clark Fork River showing 4 1/2 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  14. 4. View of bridge deck from northeast approach (bridge deck ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. View of bridge deck from northeast approach (bridge deck from southwest approach is virtually identical - Big Cottonwood River Bridge No. 246, Spanning Big Cottonwood River at Cottonwood Street (City Road No. 165), New Ulm, Brown County, MN

  15. NYSDOT Bridge Deck Task Force evaluation of bridge deck cracking on NYSDOT bridges

    DOT National Transportation Integrated Search

    2007-02-01

    This paper presents a summary of knowledge gained by the NYSDOT Bridge Deck Task Force (BDTF). Although the paper contains recommendations to reduce the prevalence and severity of bridge deck cracking, it does not include a silver bullet soluti...

  16. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter

    The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...

  17. Bridges in complex networks

    NASA Astrophysics Data System (ADS)

    Wu, Ang-Kun; Tian, Liang; Liu, Yang-Yu

    2018-01-01

    A bridge in a graph is an edge whose removal disconnects the graph and increases the number of connected components. We calculate the fraction of bridges in a wide range of real-world networks and their randomized counterparts. We find that real networks typically have more bridges than their completely randomized counterparts, but they have a fraction of bridges that is very similar to their degree-preserving randomizations. We define an edge centrality measure, called bridgeness, to quantify the importance of a bridge in damaging a network. We find that certain real networks have a very large average and variance of bridgeness compared to their degree-preserving randomizations and other real networks. Finally, we offer an analytical framework to calculate the bridge fraction and the average and variance of bridgeness for uncorrelated random networks with arbitrary degree distributions.

  18. The hepatic bridge.

    PubMed

    Sugarbaker, Paul H

    2018-07-01

    The hepatic bridge forms a tunnel of liver parenchyma that may obscure peritoneal metastases associated with the round ligament. Visualization and then resection of nodules associated with this structure is necessary. The incidence of a hepatic bridge and the extent that it covered the round ligament was determined in consecutive patients. Extent of coverage of the round ligament by the hepatic bridge was determined: Class 1 indicates up to one-third of the round ligament obscured, Class 2 up to two-thirds and Class 3 more than two-thirds. In 102 patients in whom the round ligament of the liver could be completely visualized, 50 had a hepatic bridge. Class 1 was 22 (44%) of the bridges, Class 2 was 16 (32%) and Class 3 was 12 (24%). A hepatic bridge was more frequently present in 28 of 45 male patients (62%) vs. 22 of 57 female patients (38%). Approximately one-half of our patients having cytoreductive surgery for peritoneal metastases were observed to have a hepatic bridge. Up to 56% of these patients have Class 2 or 3 hepatic bridge and may require division of the hepatic bridge to completely visualize the contents of the tunnel created by this structure. Copyright © 2018 Elsevier Ltd, BASO ~ The Association for Cancer Surgery, and the European Society of Surgical Oncology. All rights reserved.

  19. Bridge resource program.

    DOT National Transportation Integrated Search

    2013-09-01

    The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...

  20. NCDOT : bridge policy

    DOT National Transportation Integrated Search

    1994-11-01

    NCDOTs Bridge Policy establishes controlling design elements for new and reconstructed bridges on the state road system. It includes information to address sidewalks and bicycle facilities on bridges, including minimum handrail heights and sidewal...

  1. Bridged graphite oxide materials

    NASA Technical Reports Server (NTRS)

    Herrera-Alonso, Margarita (Inventor); McAllister, Michael J. (Inventor); Aksay, Ilhan A. (Inventor); Prud'homme, Robert K. (Inventor)

    2010-01-01

    Bridged graphite oxide material comprising graphite sheets bridged by at least one diamine bridging group. The bridged graphite oxide material may be incorporated in polymer composites or used in adsorption media.

  2. 50. INTERIOR OF BRIDGE SUSPENSION STRUCTURE ABOVE BRIDGE NOS. 10 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. INTERIOR OF BRIDGE SUSPENSION STRUCTURE ABOVE BRIDGE NOS. 10 AND 9 SHOWING CABLE COUNTERWEIGHT SYSTEM AND SCREW-TYPE VERTICAL ADJUSTMENT MACHINERY (LIFTING SCREWS). LOOKING NORTH. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  3. 16. LOG AND PLANK BRIDGE ON ACCESS ROAD NEAR BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. LOG AND PLANK BRIDGE ON ACCESS ROAD NEAR BRIDGE SITE; SAME STRUCTURE AS SHOWN IN PHOTO #12. ZION NP NEGATIVE NO. 967 ZIO. - Zion-Mount Carmel Highway, Virgin River Bridge, Spanning North Fork of Virgin River on Zion-Mount Carmel Highway, Springdale, Washington County, UT

  4. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek.

    DOT National Transportation Integrated Search

    2013-04-01

    The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice : newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated ...

  5. Instrumentation to Aid in Steel Bridge Fabrication : Bridge Virtual Assembly System

    DOT National Transportation Integrated Search

    2018-05-01

    This pool funded project developed a BRIDGE VIRTUAL ASSEMBLY SYSTEM (BRIDGE VAS) that improves manufacturing processes and enhances quality control for steel bridge fabrication. The system replaces conventional match-drilling with virtual assembly me...

  6. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction

    DOT National Transportation Integrated Search

    2017-09-01

    Concrete bridge decks are directly exposed to daily traffic loads and may experience some surface cracking caused by excessive stress or fatigue accumulation, which requires repair or replacement. Among typical bridges in North America, bridge decks ...

  7. BRIDGE BUILDER WILLIAM FLINN’S “CAMP & BRIDGE BUILDING OUTFIT”. INTERIOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BRIDGE BUILDER WILLIAM FLINN’S “CAMP & BRIDGE BUILDING OUTFIT”. INTERIOR VIEW SHOWING LABORERS AT MEAL TIME. - Clear Fork of Brazos River Suspension Bridge, Spanning Clear Fork of Brazos River at County Route 179, Albany, Shackelford County, TX

  8. Notable unbuilt bridges.

    DOT National Transportation Integrated Search

    1988-01-01

    Described and discussed in this exposition are a number of unusual or notable bridges proposed in this century that for various reasons were not built. Emphasis is placed on bridges in the United States, although some bridges in other countries are a...

  9. PREFACE: International Conference on Optics of Excitons in Confined Systems

    NASA Astrophysics Data System (ADS)

    Viña, Luis; Tejedor, Carlos; Calleja, José M.

    2010-01-01

    ), France (41), Spain (33), UK (24), Switzerland (21), Italy (14), The Netherlands (12), USA (11), other (23). The conference was made possible by generous sponsors, whom we thank earnestly: Universidad Autónoma de Madrid, Spanish Ministry of 'Educación y Ciencia', Consejo Superior de Investigaciones Científicas, European Union (ITN- 235114), Europhysics Letters, Semiconductor Science and Technology, Consolider Research Project 'Quantum Optical Information Technology', Lasing S A, Newport, Innova Scientific, Foundation Madrid-2016 and European Physical Society. We would like to acknowledge the members of the Organizing and Program Committees, who are responsible for the success of the Conference (names are listed below). Finally, the authors are thanked for the quality of their contributions. Luis Viña Carlos Tejedor José M Calleja EDITORS Organizing Committee Luis Viña-Chair, Universidad Autónoma de Madrid María D Martín-Scientific Secretary, Universidad Autónoma de Madrid José M Calleja, Universidad Autónoma de Madrid Luisa González, Instituto de Microelectrónica de Madrid Herko van der Meulen, Universidad Autónoma de Madrid Enrique Calleja, Instituto de Sistemas Optoelectrónicos y Microtecnología Madrid Daniele Sanvitto, Universidad Autónoma de Madrid Program Committee Carlos Tejedor-Chair, Universidad Autónoma de Madrid Israel Bar-Joseph, Weizmann Institute of Science Jeremy J Baumberg, Cambridge University Manfred Bayer, Universität Dortmund Jacqueline Bloch, Laboratoire de Photonique et de Nanostructures - CNRS Wolfgang Langbein, Cardiff University Marek Potemski, Grenoble High Magnetic Field Laboratory Antonio Quattropani, Ecole Polytechnique Fédérale de Lausanne Salvatore Savasta, Università di Messina Vincenzo Savona, Ecole Polytechnique Fédérale de Lausanne David Snoke, University of Pittsburgh Jerome Tignon, Ecole Normale Superieure Paris

  10. Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge

    Treesearch

    M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter

    The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...

  11. Bridge Programs in Illinois: Results of the 2010 Illinois Bridge Status Survey

    ERIC Educational Resources Information Center

    Taylor, J. L.; Harmon, T.

    2010-01-01

    This report provides a summary of major results of the Illinois Bridge Status Survey, administered online between April and June 2010. The purpose of the survey was to understand the extent to which bridge programs are being implemented in Illinois, as well as to build an online directory of bridge programs. Bridge programs are an emerging…

  12. PREFACE: 1st International Conference on Mechanical Engineering Research 2011 (ICMER2011)

    NASA Astrophysics Data System (ADS)

    Abu Bakar, Rosli

    2012-09-01

    The year 2010 represented a significant milestone in the history of the Mechanical Engineering community with the organization of the first and second national level conferences (National Conference in Mechanical Engineering for Research, 1st and 2nd NCMER) at Universiti Malaysia Pahang on 26-27 May and 3-4 December 2010. The conferences attracted a large number of delegates from different premier academic and research institutions in the country to participate and share their research experiences at the conference. The International Conference on Mechanical Engineering Research (ICMER 2011) followed on from the first and second conferences due to good support from researchers. The ICMER 2011 is a good platform for researchers and postgraduate students to present their latest finding in research. The conference covers a wide range of topics including the internal combustion engine, machining processes, heat and mass transfer, fuel, biomechanical analysis, aerodynamic analysis, thermal comfort, computational techniques, design and simulation, automotive transmission, optimization techniques, hybrid electric vehicles, engine vibration, heat exchangers, finite element analysis, computational fluid dynamics, green energy, vehicle dynamics renewable energy, combustion, design, product development, advanced experimentation techniques, to name but a few. The international conference has helped to bridge the gap between researchers working at different institutions and in different countries to share their knowledge and has helped to motivate young scientists with their research. This has also given some clear direction for further research from the deliberations of the conference. Several people have contributed in different ways to the success of the conference. We thank the keynote speakers and all authors of the contributed papers, for the cooperation rendered to us in the publication of the CD conference proceedings. In particular, we would like to place on record our

  13. Distance Learning '99. Proceedings of the Annual Conference on Distance Teaching and Learning (15th, Madison, Wisconsin, August 4-6, 1999).

    ERIC Educational Resources Information Center

    Wisconsin Univ. System, Madison.

    This document contains 71 papers and 11 workshop presentations on distance teaching and learning from a conference on educational research. The following are among the papers included: "Bridging Distances and Differences" (Nancy Anderson); "The Role of Site Directors in Faculty and Student Success" (Edith M. Barnett, Jeanie P.…

  14. Parryville Bridge (S.R. 2008, section 01B Bridge) looking north across ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Parryville Bridge (S.R. 2008, section 01B Bridge) looking north across traffic level, showing village of Parryville. - Parryville Bridge, State Route 2008 over Pohapoco Creek, Parryville, Carbon County, PA

  15. Highlights from SelectBio 2015: Academic Drug Discovery Conference, Cambridge, UK, 19-20 May 2015.

    PubMed

    Spencer, John; Coaker, Hannah

    2015-01-01

    The SelectBio 2015: Academic Drug Discovery Conference was held in Cambridge, UK, on 19-20 May 2015. Building on the success of academic drug discovery events in the USA, this conference aimed to showcase the exciting new research emerging from academic drug discovery and to help bridge the gap between basic research and commercial application. At the event the authors heard from a number of speakers on a broad array of topics, from partnering models for academia and industry to novel drug discovery approaches across various therapeutic areas, with a few talks, such as those by Susanne Muller-Knapp (Structure Genomics Consortium, Oxford University, Oxford, UK) and Julian Blagg (Institute of Cancer Research, UK), covering both remits, by highlighting a number of such partnerships and then delving into some case studies. The conference concluded with a heated debate on whether phenotypic discovery should be favored over targeted discovery in academia and pharma, in a panel discussion chaired by Roland Wolkowicz (San Diego State University, USA).

  16. Bridge deterioration models to support Indiana's bridge management system.

    DOT National Transportation Integrated Search

    2016-02-01

    An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...

  17. Early Origins of Child Obesity: Bridging Disciplines and Phases of Development - September 30–October 1, 2010

    PubMed Central

    Christoffel, Katherine Kaufer; Wang, Xiaobin; Binns, Helen J.

    2012-01-01

    This report summarizes a conference: “Early Origins of Child Obesity: Bridging Disciplines and Phases of Development”, held in Chicago on September 30–October 1, 2010. The conference was funded in part by the National Institutes of Health and the Williams Heart Foundation, to achieve the conference objective: forging a next-step research agenda related to the early origins of childhood obesity. This research agenda was to include working with an array of factors (from genetic determinants to societal ones) along a continuum from prenatal life to age 7, with an emphasis on how the developing child deals with the challenges presented by his/her environment (prenatal, parental, nutritional, etc.). The conference offered a unique opportunity to facilitate communication and planning of future work among a variety of researchers whose work separately addresses different periods in early life. Over the span of two days, speakers addressed existing, critical research topics within each of the most-studied age ranges. On the final day, workshops fostered the discussion needed to identify the highest priority research topics related to linking varied early factor domains. These are presented for use in planning future research and research funding. PMID:23443002

  18. Designing timber bridge superstructures : a comparison of U.S. and Canadian bridge codes.

    Treesearch

    James Scott Groenier; James P. Wacker

    2008-01-01

    Several changes relating to timber bridges have been incorporated into the AASHTO-LRFD Bridge Design Specifications recently. In addition, the Federal Highway Administration is strongly encouraging an LRFD-based design approach for all new bridges in the United States. The Bridge Design Code in Canada was one of the first to adopt the limit states design philosophy,...

  19. Field Performance of Timber Bridges. 16: North Siwell Road Stress-Laminated Bridge

    DOT National Transportation Integrated Search

    1998-03-01

    This report is 16th in a series of reports that documents the : field performance of timber bridges. The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single span, stress laminated T-beam ...

  20. Performance Assessment of Bridges Using GPS: The Juarez Bridge in Culiacan, Mexico

    NASA Astrophysics Data System (ADS)

    Vazquez, G. E.; Gaxiola-Camacho, J. R.; Trejo, M.; Echagaray, J.; Guzman, G. M.

    2015-12-01

    Performance assessment of bridges has become very important during recent years. Bridges around the world are aging, leading to the incorporation of efficient, reliable, and economic evaluation procedures. These techniques must assess properly the performance of bridges under several loading conditions in a real manner, representing the physics of the problem. Among several approaches, Global Positioning System (GPS) can be intelligently used for the performance evaluation of bridges. We focused on GPS, since it naturally produces position estimates as compared to seismic instruments that record either velocity or acceleration, and thus require an integration. There are several reasons that make the Juarez Bridge a case of study for evaluation: it is approximately 45 years old, it is a reinforced concrete structure, it connects two significant zones of the city, and its spans is closely to 200 meters long. In addition, thousands of vehicles and pedestrians use the Juarez Bridge every day, which make feasible the GPS performance assessment. Hence, in order to produce optimal position estimates, GPS data were collected during two consecutive hours at three different periods of the day for a whole week (Monday through Sunday), to represent three critical limit states of the bridge (mid-span and end-spans). GPS data were processed using the GAMIT/GLOBK software, considering 1-second sampling rate, 15-degree cutoff angle, ionosphere-free double-differenced (DD) carrier phase method, and precise final orbits disseminated by IGS (International GNSS Service). The displacements obtained from the above discussed procedure are compared with allowable values documented in bridge construction manuals. Reliability theory was used to evaluate the probability of failure of the bridge for the three periods of the day. In addition, a conclusion was made about the most risky day of the week for the use of the Juarez Bridge. It is expected that the results from the proposed research

  1. Field performance of timber bridges. 9, Big Erick`s stress-laminated deck bridge

    Treesearch

    J. A. Kainz; J. P. Wacker; M. Nelson

    The Big Erickas bridge was constructed during September 1992 in Baraga County, Michigan. The bridge is 72 ft long, 16 ft wide, and consists of three simple spans: two stress-laminated deck approach spans and a stress-laminated box center span. The bridge is unique in that it is one of the first known stress-laminated timber bridge applications to use Eastern Hemlock...

  2. Field performance of timber bridges. 5, Little Salmon Creek stress-laminated deck bridge

    Treesearch

    M. A. Ritter; J. A. Kainz; G. J. Porter

    The Little Salmon Creek bridge was constructed in November 1988 on the Allegheny National Forest in Pennsylvania. The bridge is a simple span, single-lane, stress-laminated deck superstructure that is approximately 26-ft long and 16-ft wide. The bridge is unique in that it is the first known stress-laminated timber bridge to be constructed of hardwood lumber. The...

  3. Improving bridge load rating accuracy.

    DOT National Transportation Integrated Search

    2013-06-01

    Nearly one-quarter of Alabamas bridges are deemed structurally deficient or functionally obsolete. An : additional seven percent of Alabamas bridges were posted bridges in 2010. (Federal Highway Administration, : 2011) Accurate bridge load rati...

  4. Hydraulic modeling of flow impact on bridge structures: a case study on Citarum bridge

    NASA Astrophysics Data System (ADS)

    Siregar, R. I.

    2018-02-01

    Flood waves because of the rapid catchment response to high intense rainfall, breaches of flood defenses may induce huge impact forces on structures, causing structural damage or even failures. Overflowing stream that passes over the bridge, it means to discharge flood water level is smaller than the capacity of the river flow. In this study, the researches present the methodological approach of flood modeling on bridge structures. The amount of force that obtained because of the hydrostatic pressure received by the bridge at the time of the flood caused the bridge structure disrupted. This paper presents simulation of flow impact on bridge structures with some event flood conditions. Estimating the hydrostatic pressure developed new model components, to quantify the flow impact on structures. Flow parameters applied the model for analyzing, such as discharge, velocity, and water level or head that effect of bridge structures. The simulation will illustrate the capability of bridge structures with some event flood river and observe the behavior of the flow that occurred during the flood. Hydraulic flood modeling use HEC-RAS for simulation. This modeling will describe the impact on bridge structures. Based on the above modelling resulted, in 2008 has flood effect more than other years on the Citarum Bridge, because its flow overflow on the bridge.

  5. A BRIDGE partnership model for health management education in the Slovak Republic.

    PubMed

    West, D J; Krcmery, V; Rusnakova, V; Murgas, M

    1998-01-01

    An innovative Health Management Education Partnership (HMEP) was initiated to develop management education initiatives through the exchange of information and ideas. Health education efforts, projects and activities exist between the University of Scranton and three strategic partners in the Slovak Republic: Trnava University, the Health Management School and the University of Matej Bel. The BRIDGE model (Building Relationships in Developing and Growing Economies) utilizes several innovative educational initiatives and strategic projects including a professional journal, faculty development, professional development, curriculum development, certification and accreditation, faculty-students exchange and development of educational materials and modules. The BRIDGE organizational structure is reviewed as well as specific workplan objectives to operationalize the HMEP encouraging mutual cooperation, collaboration and sustainability of efforts. The model stresses implementation, monitoring, and evaluation of all initiatives through a strong community effort, focus on research, deployment of educational resources, curriculum modification, development of interpartnership activities, conferences, workshops, fieldwork experiences and study tours. Applied management practices enhance market-oriented solutions to health care delivery problems emphasizing a focus on privatization and entrepreneurship through education.

  6. Employee Involvement: The Competitive Edge. Transactions of the IAQC Annual Conference and Resource Mart (9th, New Orleans, Louisiana, April 6-9, 1987).

    ERIC Educational Resources Information Center

    Association for Quality and Participation, Cincinnati, OH.

    Among the 96 papers presented at this conference are the following: "Team Building Techniques that Get Results" (Berg); "The Subtleties of Communication in Small Group Meetings" (Henry); "Feedback--Its Role in Team Building" (Lucas); "Group Dynamics--Success through Interaction" (Manning, Johnson); "The Able-Bodied Handicapped: Bridging the Gap"…

  7. Development of bridge girder movement criteria for accelerated bridge construction.

    DOT National Transportation Integrated Search

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  8. Diode-quad bridge circuit means

    NASA Technical Reports Server (NTRS)

    Harrison, D. R.; Dimeff, J. (Inventor)

    1975-01-01

    Diode-quad bridge circuit means is described for use as a transducer circuit or as a discriminator circuit. It includes: (1) a diode bridge having first, second, third, and fourth bridge terminals consecutively coupled together by four diodes polarized in circulating relationship; (2) a first impedance connected between the second bridge terminal and a circuit ground; (3) a second impedance connected between the fourth bridge terminal and the circuit ground; (4) a signal source having a first source terminal capacitively coupled to the first and third bridge terminals, and a second source terminal connected to the circuit ground; and (5) an output terminal coupled to the first bridge terminal and at which an output signal may be taken.

  9. 4. VIEW OF SILVER BRIDGE (ST. MARY'S BRIDGE), CARRYING COUNTY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW OF SILVER BRIDGE (ST. MARY'S BRIDGE), CARRYING COUNTY ROAD OVER SOURIS RIVER NEAR SOUTH END OF REFUGE, LOOKING NORTHEAST - Upper Souris National Wildlife Refuge Dams, Souris River Basin, Foxholm, Surrey (England), ND

  10. Dog Bridge, view of the deck of the bridge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Dog Bridge, view of the deck of the bridge and rails looking from Linden Lane - National Park Seminary, Bounded by Capitol Beltway (I-495), Linden Lane, Woodstove Avenue, & Smith Drive, Silver Spring, Montgomery County, MD

  11. 2. DETAIL OF KLINGLE ROAD BRIDGE AND PATHWAY BRIDGE CROSSINGS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. DETAIL OF KLINGLE ROAD BRIDGE AND PATHWAY BRIDGE CROSSINGS. AERIAL VIEW OF BEACH DRIVE AT INTERSECTION OF KLINGLE ROAD AND PORTER STREET. VIEW NE. - Rock Creek Park Road System, Washington, District of Columbia, DC

  12. Load ratings for secondary bridges.

    DOT National Transportation Integrated Search

    1991-05-01

    A load rating states the load in tons which a vehicle can impose on a bridge. : Changes in guidelines, standards, and customary uses of bridges require : analyses of bridges to be updated and re-evaluated. : In this report, twenty-two secondary bridg...

  13. Akashi Kaikyo Bridge, Japan

    NASA Image and Video Library

    2013-03-25

    NASA Terra spacecraft shows the Akashi Kaikyo Bridge or Pearl Bridge, the longest central span of any suspension bridge in the world, at 1991 meters, connecting the city of Kobe, Japan with Iwaja on Awaji Island by crossing the busy Akashi Strait.

  14. trans-Methylpyridine cyclen versus cross-bridged trans-methylpyridine cyclen. Synthesis, acid-base and metal complexation studies (metal = Co2+, Cu2+, and Zn2+).

    PubMed

    Bernier, Nicolas; Costa, Judite; Delgado, Rita; Félix, Vítor; Royal, Guy; Tripier, Raphaël

    2011-05-07

    The synthesis of the cross-bridged cyclen CRpy(2) {4,10-bis((pyridin-2-yl)methyl)-1,4,7,10-tetraazabicyclo[5.5.2]tetradecane}, a constrained analogue of the previously described trans-methylpyridine cyclen Cpy(2) is reported. The additional ethylene bridge confers to CRpy(2) proton-sponge type behaviour which was explored by NMR and potentiometric studies. Transition metal complexes have been synthesized (by complexation of both ligands with Co(2+), Cu(2+) and Zn(2+)) and characterized in solution and in the solid state. The single crystal X-ray structures of [CoCpy(2)](2+), [CuCpy(2)](2+) and [ZnCpy(2)](2+) complexes were determined. Stability constants of the complexes, including those of the cross-bridged derivative, were determined using potentiometric titration data and the kinetic inertness of the [CuCRpy(2)](2+) complex in an acidic medium (half-life values) was evaluated by spectrophotometry. The pre-organized structure of the cross-bridged ligand imposes an additional strain for the complexation leading to complexes with smaller thermodynamic stability in comparison with the related non-bridged ligand. The electrochemical study involving cyclic voltammetry underlines the importance of the ethylene cross-bridge on the redox properties of the transition metal complexes.

  15. Morphological aspects of myocardial bridges.

    PubMed

    Lujinović, Almira; Kulenović, Amela; Kapur, Eldan; Gojak, Refet

    2013-11-01

    Although some myocardial bridges can be asymptomatic, their presence often causes coronary disease either through direct compression of the "tunnel" segment or through stimulation and accelerated development of atherosclerosis in the segment proximally to the myocardial bridge. The studied material contained 30 human hearts received from the Department of Anatomy. The hearts were preserved 3 to 5 days in 10% formalin solution. Thereafter, the fatty tissue was removed and arterial blood vessels prepared by careful dissection with special reference to the presence of the myocardial bridges. Length and thickness of the bridges were measured by the precise electronic caliper. The angle between the myocardial bridge fibre axis and other axis of the crossed blood vessel was measured by a goniometer. The presence of the bridges was confirmed in 53.33% of the researched material, most frequently (43.33%) above the anterior interventricular branch. The mean length of the bridges was 14.64 ± 9.03 mm and the mean thickness was 1.23 ± 1.32 mm. Myocardial bridge fibres pass over the descending blood vessel at the angle of 10-90 degrees. The results obtained on a limited sample suggest that the muscular index of myocardial bridge is the highest for bridges located on RIA, but that the difference is not significant in relation to bridges located on other branches. The results obtained suggest that bridges located on other branches, not only those on RIA, could have a great contractive power and, consequently, a great compressive force, which would be exerted on the wall of a crossed blood vessel.

  16. Field performance of timber bridges. 17, Ciphers stress-laminated deck bridge

    Treesearch

    James P. Wacker; James A. Kainz; Michael A. Ritter

    In September 1989, the Ciphers bridge was constructed within the Beltrami Island State Forest in Roseau County, Minnesota. The bridge superstructure is a two-span continuous stress-laminated deck that is approximately 12.19 m long, 5.49 m wide, and 305 mm deep (40 ft long, 18 ft wide, and 12 in. deep). The bridge is one of the first to utilize red pine sawn lumber for...

  17. Stability of aggregates in the environment: role of solid bridging

    NASA Astrophysics Data System (ADS)

    Seiphoori, A.; Jerolmack, D. J.; Arratia, P. E.

    2017-12-01

    Colloids in suspension may form larger flocs under favorable conditions, via diffusion- or reaction-limited aggregation. In addition, the process of drying colloidal suspensions drives colloids together via hydrodynamic forces to form aggregates, that may be stable or unstable when subject to re-wetting and transport. Channel banks, shorelines and hillslopes are examples where the periodic wetting and drying results in the aggregation of muds. If aggregates disperse, the mud structure is unstable to subsequent wetting or fluid shear and can easily be detached and transported to rivers and coasts. The effective friction that governs hillslope and channel-bank soil creep rates also depends on the stability of the soil aggregates. Yet, few studies probe the particle-scale assembly or stability of aggregates subject to environmental loads, and the effects of shape or size heterogeneity have not been examined in detail. Here we investigate the formation and stability of aggregates subject to passive re-wetting (by misting) and shearing using a simple Poiseuille flow in a microfluidic device. We study the kinetics of a wide range of silicate colloids of different size and surface charge properties using in situ microscopy and particle tracking. We find that negatively charged silica microspheres are dragged by the retreating edge of an evaporating drop and are resuspended easily on re-wetting, showing that aggregates are unstable. In contrast, a bi-disperse suspension created by the addition of silica nanoparticles forms stable deposits, where nanoparticles bind larger particles by bridging the interparticle space, a mechanism similar to capillary bridging that we refer to as "solid bridging." Although aggregate structure and dynamics of the bi-disperse system changes quantitatively with surface-charge of the nanoparticles, smaller particles always conferred stability on the aggregates. Investigation of other colloids, including asbestos fibers and various clays, reveals

  18. 6. VIEW OF GDOT BRIDGE NO. 02700268X00678N BRIDGE PLATE IDENTIFYING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF GDOT BRIDGE NO. 027-00268X-00678N BRIDGE PLATE IDENTIFYING COUNTY COMMISSIONERS AT THE TIME OF CONSTRUCTION. - GDOT Bridge No. 027-00268X-00678N, County Road 268-Empress Road span Piscola Creek, Quitman, Brooks County, GA

  19. SSI-bridge : soil bridge interaction during long-duration earthquake motions.

    DOT National Transportation Integrated Search

    2014-09-01

    The seismic response of a complete soil-bridge system during shallow, crustal and subduction zone earthquakes is the topic of this report. Specifically, the effects of earthquake duration on the seismic performance of soil-bridge systems are examined...

  20. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  1. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  2. 76 FR 55160 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  3. 77 FR 53251 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  4. 75 FR 62181 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  5. Sixth International Conference on Systems Biology (ICSB 2005)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Professor Andrew Murray

    2005-10-22

    This grant supported the Sixth International Conference on Systems Biology (ICSB 2005), held in Boston, Massachusetts from October 19th to 22nd, 2005. The ICSB is the only major, annual, international conference focused exclusively on the important emerging field of systems biology. It draws together scientists with expertise in theoretical, computational and experimental approaches to understanding biological systems at many levels. Previous ICSB meetings have been held in Tokyo (2000), at Caltech (2001), at the Karolinska Institute (2002), at Washington University in St. Louis (2003), and in Heidelberg (2004). These conferences have been increasingly successful at bringing together the growing communitymore » of established and junior researchers with interests in this area. Boston is home to several groups that have shown leadership in the field and was therefore an ideal place to hold this conference . The executive committee for the conference comprised Jim Collins (Biomedical Engineering, Boston University), Marc Kirschner (chair of the new Department of Systems Biology at Harvard Medical School), Eric Lander (director of the Broad Institute of MIT and Harvard), Andrew Murray (director of Harvard’s Bauer Center for Genomics Research) and Peter Sorger (director of MIT’s Computational and Systems Biology Initiative). There are almost as many definitions of systems biology as there are systems biologists. We take a broad view of the field, and we succeeded in one of our major aims in organizing a conference that bridges two types of divide. The first is that between traditional academic disciplines: each of our sessions includes speakers from biology and from one or more physical or quantitative sciences. The second type includes those that separate experimental biologists from their colleagues who work on theory or computation. Here again, each session included representatives from at least two of these three categories; indeed, many of the speakers

  6. Comprehensive evaluation of fracture critical bridges.

    DOT National Transportation Integrated Search

    2014-02-01

    Two-girder steel bridges are classified as fracture critical bridges based on the definition given in the AASHTO LRFD Bridge Design Specifications. In a fracture critical bridge a failure of a tension member leads to collapse of the bridge. However, ...

  7. Evaluation of bridge replacement alternatives for the county bridge system.

    DOT National Transportation Integrated Search

    1994-08-01

    Recent reports have indicated that 23.5 percent of the nation's highway bridges are : structurally deficient and 17.7 percent are functionally obsolete. A significant number of these bridges : are on the Iowa county road system. The objective of the ...

  8. A quarter century of research on the Colorado Plateau: A compilation of the Colorado Plateau Biennial Conference Proceedings for 1993-2015

    USGS Publications Warehouse

    van Riper, Charles; Drost, Charles A.; Selleck, S. Shane

    2015-01-01

    This Open-File Report is a compilation of the work published in the Colorado Plateau Biennial Conference book series over the span of the past nearly quarter century (conferences held between 1991–2011). The primary focus of the conferences has been to work toward integrating new science findings into management of the region’s natural and cultural resources. This conference and book series has begun a tradition of cooperation and community, bridging cultural, social, and biophysical research interests and addressing the needs of scientists and land managers working in a complex geographic area. We include here the abstracts for each of the 11 books in the series, as well as links to files with comprehensive literature citations and author listings. The goal of this compilation is to encourage further cooperation and communication on research and management issues of the Colorado Plateau among researchers, land managers, Native American tribes, and the public.   

  9. Field performance of timber bridges. 16, North Siwell Road stress-laminated bridge

    Treesearch

    J. A. Kainz

    The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single-span, stress-laminated T-beam structure that measures 9.1 m (30 ft) long and 8.7 m (28.5 ft) wide. Performance of the bridge was monitored for 24 months, beginning at the time of installation. Monitoring involved gathering and evaluating data relative...

  10. Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge

    Treesearch

    P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter

    The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...

  11. Performance evaluation of bridges with structural bridge deck overlays (SBDO).

    DOT National Transportation Integrated Search

    2006-03-01

    Structural Bridge Deck Overlay (SBDO) involves applying 6 to 10 inches (150 to 200 mm) of normal weight, class AA, reinforced concrete directly to a bridges original slab. The overlay is designed to increase the deck elevation to an extent that st...

  12. Long continuous bridge deck evaluation : John Day River Bridge, Clatsop County, Bridge No. 1827B : final report.

    DOT National Transportation Integrated Search

    1995-06-01

    The John Day River Bridge, near Astoria, Oregon was built with a continuous deck length of 1,105 ft. (340 m). The rationale for designing the John Day River Bridge with an unusually long continuous deck is in part based on the site's very mild climat...

  13. Reconfigurable wireless monitoring systems for bridges: validation on the Yeondae Bridge

    NASA Astrophysics Data System (ADS)

    Kim, Junhee; Lynch, Jerome P.; Zonta, Daniele; Lee, Jong-Jae; Yun, Chung-Bang

    2009-03-01

    The installation of a structural monitoring system on a medium- to large-span bridge can be a challenging undertaking due to high system costs and time consuming installations. However, these historical challenges can be eliminated by using wireless sensors as the primary building block of a structural monitoring system. Wireless sensors are low-cost data acquisition nodes that utilize wireless communication to transfer data from the sensor to the data repository. Another advantageous characteristic of wireless sensors is their ability to be easily removed and reinstalled in another sensor location on the same structure; this installation modularity is highlighted in this study. Wireless sensor nodes designed for structural monitoring applications are installed on the 180 m long Yeondae Bridge (Korea) to measure the dynamic response of the bridge to controlled truck loading. To attain a high nodal density with a small number (20) of wireless sensors, the wireless sensor network is installed three times with each installation concentrating sensors in one portion of the bridge. Using forced and free vibration response data from the three installations, the modal properties of the bridge are accurately identified. Intentional nodal overlapping of the three different sensor installations allows mode shapes from each installation to be stitched together into global mode shapes. Specifically, modal properties of the Yeondae Bridge are derived off-line using frequency domain decomposition (FDD) modal analysis methods.

  14. 33 CFR 115.40 - Bridge repairs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Bridge repairs. 115.40 Section 115.40 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.40 Bridge repairs. Repairs to a bridge which do...

  15. 33 CFR 115.40 - Bridge repairs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Bridge repairs. 115.40 Section 115.40 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.40 Bridge repairs. Repairs to a bridge which do...

  16. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs

    PubMed Central

    Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. PMID:29146667

  17. Wright-Fisher diffusion bridges.

    PubMed

    Griffiths, Robert C; Jenkins, Paul A; Spanò, Dario

    2017-10-06

    The trajectory of the frequency of an allele which begins at x at time 0 and is known to have frequency z at time T can be modelled by the bridge process of the Wright-Fisher diffusion. Bridges when x=z=0 are particularly interesting because they model the trajectory of the frequency of an allele which appears at a time, then is lost by random drift or mutation after a time T. The coalescent genealogy back in time of a population in a neutral Wright-Fisher diffusion process is well understood. In this paper we obtain a new interpretation of the coalescent genealogy of the population in a bridge from a time t∈(0,T). In a bridge with allele frequencies of 0 at times 0 and T the coalescence structure is that the population coalesces in two directions from t to 0 and t to T such that there is just one lineage of the allele under consideration at times 0 and T. The genealogy in Wright-Fisher diffusion bridges with selection is more complex than in the neutral model, but still with the property of the population branching and coalescing in two directions from time t∈(0,T). The density of the frequency of an allele at time t is expressed in a way that shows coalescence in the two directions. A new algorithm for exact simulation of a neutral Wright-Fisher bridge is derived. This follows from knowing the density of the frequency in a bridge and exact simulation from the Wright-Fisher diffusion. The genealogy of the neutral Wright-Fisher bridge is also modelled by branching Pólya urns, extending a representation in a Wright-Fisher diffusion. This is a new very interesting representation that relates Wright-Fisher bridges to classical urn models in a Bayesian setting. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Extracorporeal Life Support Bridge to Ventricular Assist Device: The Double Bridge Strategy.

    PubMed

    Marasco, Silvana F; Lo, Casey; Murphy, Deirdre; Summerhayes, Robyn; Quayle, Margaret; Zimmet, Adam; Bailey, Michael

    2016-01-01

    In patients requiring left ventricular assist device (LVAD) support, it can be difficult to ascertain suitability for long-term mechanical support with LVAD and eventual transplantation. LVAD implantation in a shocked patient is associated with increased morbidity and mortality. Interest is growing in the utilization of extracorporeal life support (ECLS) as a bridge-to-bridge support for these critically unwell patients. Here, we reviewed our experience with ECLS double bridging. We hypothesized that ECLS double bridging would stabilize end-organ dysfunction and reduce ventricular assist device (VAD) implant perioperative mortality. We conducted a retrospective review of prospectively collected data for 58 consecutive patients implanted with a continuous-flow LVAD between January 2010 and December 2013 at The Alfred Hospital, Melbourne, Victoria, Australia. Twenty-three patients required ECLS support pre-LVAD while 35 patients underwent LVAD implantation without an ECLS bridge. Preoperative morbidity in the ECLS bridge group was reflected by increased postoperative intensive care duration, blood loss, blood product use, and postoperative renal failure, but without negative impact upon survival when compared with the no ECLS group. ECLS stabilization improved end-organ function pre-VAD implant with significant improvements in hepatic and renal dysfunction. This series demonstrates that the use of ECLS bridge to VAD stabilizes end-organ dysfunction and reduces VAD implant perioperative mortality from that traditionally reported in these "crash and burn" patients. Copyright © 2015 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.

  19. Advanced bridge safety initiative : FRP flexural retrofit for concrete slab bridges - task 4 deliverables.

    DOT National Transportation Integrated Search

    2014-06-01

    Concrete slab bridges are being examined as part of the MaineDOT Advanced Bridge Safety Initiative. Under Tasks : 1 3 a finite element analysis program is developed, validated and applied to twenty bridges. : Task 4 investigates and develops a no...

  20. Semiconductor bridge (SCB) detonator

    DOEpatents

    Bickes, Jr., Robert W.; Grubelich, Mark C.

    1999-01-01

    The present invention is a low-energy detonator for high-density secondary-explosive materials initiated by a semiconductor bridge igniter that comprises a pair of electrically conductive lands connected by a semiconductor bridge. The semiconductor bridge is in operational or direct contact with the explosive material, whereby current flowing through the semiconductor bridge causes initiation of the explosive material. Header wires connected to the electrically-conductive lands and electrical feed-throughs of the header posts of explosive devices, are substantially coaxial to the direction of current flow through the SCB, i.e., substantially coaxial to the SCB length.

  1. Semiconductor bridge (SCB) detonator

    DOEpatents

    Bickes, R.W. Jr.; Grubelich, M.C.

    1999-01-19

    The present invention is a low-energy detonator for high-density secondary-explosive materials initiated by a semiconductor bridge (SCB) igniter that comprises a pair of electrically conductive lands connected by a semiconductor bridge. The semiconductor bridge is in operational or direct contact with the explosive material, whereby current flowing through the semiconductor bridge causes initiation of the explosive material. Header wires connected to the electrically-conductive lands and electrical feed-throughs of the header posts of explosive devices, are substantially coaxial to the direction of current flow through the SCB, i.e., substantially coaxial to the SCB length. 3 figs.

  2. Bridge maintenance to enhance corrosion resistance and performance of steel girder bridges

    NASA Astrophysics Data System (ADS)

    Moran Yanez, Luis M.

    The integrity and efficiency of any national highway system relies on the condition of the various components. Bridges are fundamental elements of a highway system, representing an important investment and a strategic link that facilitates the transport of persons and goods. The cost to rehabilitate or replace a highway bridge represents an important expenditure to the owner, who needs to evaluate the correct time to assume that cost. Among the several factors that affect the condition of steel highway bridges, corrosion is identified as the main problem. In the USA corrosion is the primary cause of structurally deficient steel bridges. The benefit of regular high-pressure superstructure washing and spot painting were evaluated as effective maintenance activities to reduce the corrosion process. The effectiveness of steel girder washing was assessed by developing models of corrosion deterioration of composite steel girders and analyzing steel coupons at the laboratory under atmospheric corrosion for two alternatives: when high-pressure washing was performed and when washing was not considered. The effectiveness of spot painting was assessed by analyzing the corrosion on steel coupons, with small damages, unprotected and protected by spot painting. A parametric analysis of corroded steel girder bridges was considered. The emphasis was focused on the parametric analyses of corroded steel girder bridges under two alternatives: (a) when steel bridge girder washing is performed according to a particular frequency, and (b) when no bridge washing is performed to the girders. The reduction of structural capacity was observed for both alternatives along the structure service life, estimated at 100 years. An economic analysis, using the Life-Cycle Cost Analysis method, demonstrated that it is more cost-effective to perform steel girder washing as a scheduled maintenance activity in contrast to the no washing alternative.

  3. Bridging gaps in discovery and development: chemical and biological sciences for affordable health, wellness and sustainability.

    PubMed

    Chauhan, Prem Man Singh

    2011-05-01

    To commemorate 2011 as the International Year of Chemistry, the Indian Society of Chemists and Biologists organized its 15th International Conference on 'Bridging Gaps in Discovery and Development: Chemical and Biological Sciences for Affordable Health, Wellness and Sustainability' at Hotel Grand Bhagwati, in association with Saurashtra University, Rajkot, India. Anamik Shah, President of the Indian Society of Chemists and Biologists, was organizing secretary of the conference. Nicole Moreau, President of the International Union of Pure and Applied Chemistry and Secretary General of the Comité National de la Chimie, National Centre for Scientific Research France, was chief guest of the function. The four-day scientific program included 52 plenary lectures, 24 invited lectures by eminent scientists in the field and 12 oral presentations. A total of 317 posters were presented by young scientists and PhD students in three different poster sessions. Approximately 750 delegates from India, the USA, UK, France, Switzerland, Germany, Austria, Belgium, Sweden, Japan and other countries attended the conference. The majority of the speakers gave presentations related to their current projects and areas of interest and many of the talks covered synthesis, structure-activity relationships, current trends in medicinal chemistry and drug research.

  4. Bridge Workshop : Enhancing Bridge Performance, February 21-22, 2008, Reston, Virginia : workshop report

    Treesearch

    Sreenivas Alampalli; Sheila Rimal Duwadi; Reagan Sentelle Herman; Danielle D. Kleinhans; Khaled Mahmoud; James C. Ray; James P. Wacker; Nur Yazdani

    2008-01-01

    The participants to the workshop were given the charge to discuss (1) bridge design issues including best practices in design and detailing that could be used to improve durability, extend service life and prevent premature deterioration, (2) performance measures needed to better determine bridge condition, (3) technologies that could be used to monitor bridge life and...

  5. Field performance of timber bridges. 15, Pueblo County, Colorado, stress-laminated deck bridge

    Treesearch

    L. E. Hislop

    The Pueblo County 204B bridge was constructed in March 1990 in Pueblo, Colorado, as a demonstration bridge under the USDA Forest Service Timber Bridge Initiative. The stress-laminated deck superstructure is approximately 10 m long, 9 m wide, and 406 mm deep, with a skew of 10 degrees. Performance monitoring was conducted for 3 years, beginning at...

  6. Seismic testing of precast segmental bridges, Phase III : bridge system test.

    DOT National Transportation Integrated Search

    2005-06-01

    This report discusses the main findings of a test examining the seismic behavior of a precast, post-tensioned, segmental bridge : superstructure with a cast-in-place, hollow, rectangular column. The half-scale specimen modeled a prototype bridge from...

  7. Bridge deck deicing

    DOT National Transportation Integrated Search

    1998-01-01

    Concrete bridge decks are prone to ice accumulation. The use of road salts and chemicals for deicing is cost effective but causes damage to concrete and corrosion of reinforcing steel in concrete bridge decks. This problem is a major concern to trans...

  8. The Cardiff Study of all Wales and North West of England Twins (CaStANET): a longitudinal research program of child and adolescent development.

    PubMed

    van den Bree, Marianne B M; Rice, Frances; Fowler, Tom A; Shelton, Katherine H; Lifford, Kate J; Scourfield, Jane; Harold, Gordon T; Thapar, Anita

    2007-02-01

    The study of twins and their families provides a highly useful tool for disentangling the genetic and environmental origins of traits. The Cardiff Study of All Wales and North West of England Twins (CaStANET) has followed children and adolescents over time into early adulthood, assessing a wide range of aspects of behavior and psychopathology using self-, parent and teacher reports. Four main waves of data collection have taken place to date, which have provided a wealth of information on the contributions of genetic and environmental risk factors to the psychological health of young people. This article first describes the CaStANET register and subsequently presents some of the findings that have emerged from this resource, with a focus on depression and anxiety, chronic fatigue, attention-deficit/hyperactivity disorder, conduct problems and prosocial behavior. We describe in somewhat more detail the 4th wave of data collection, which has recently been completed and has provided us with extensive information on substance use and problem use as well as associated risk factors in the twins and their families, including longitudinal data on conduct problems and the relations between family members. Because of the wealth of data already collected and the opportunity for genetically informative analyses over time, CaStANET provides a valuable resource for understanding the complexities of the psychological development of young people.

  9. Removal of failed crown and bridge

    PubMed Central

    Rahul, G R.; Poduval, Soorya T.; Shetty, Karunakar

    2012-01-01

    Crown and bridge have life span of many years but they fail for a number of reasons. Over the years, many devices have been designed to remove crowns and bridges from abutment teeth. While the removal of temporary crowns and bridges is usually very straightforward, the removal of a definitive cast crown with unknown cement is more challenging. Removal is often by destructive means. There are a number of circumstances, however, in which conservative disassembly would aid the practitioner in completing restorative/endodontic procedures. There are different mechanisms available to remove a failed crown or bridge. But there is no information published about the classification of available systems for crown and bridge removal. So it is logical to classify these systems into different groups which can help a clinician in choosing a particular type of system depending upon the clinical situation. The aim of this article is to provide a classification for various crown and bridge removal systems; describe how a number of systems work; and when and why they might be used. A PubMed search of English literature was conducted up to January 2010 using the terms: Crown and bridge removal, Crown and bridge disassembly, Crown and bridge failure. Additionally, the bibliographies of 3 previous reviews, their cross references as well as articles published in various journals like International Endodontic Journal, Journal of Endodontics and were manually searched. Key words:Crown and bridge removal, Crown and bridge disassembly, Crown and bridge failure. PMID:24558549

  10. 49 CFR 237.109 - Bridge inspection records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge inspection records. 237.109 Section 237.109..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.109 Bridge inspection records... performed on those bridges under this part. (b) Each record of an inspection under the bridge management...

  11. 49 CFR 237.109 - Bridge inspection records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge inspection records. 237.109 Section 237.109..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.109 Bridge inspection records... performed on those bridges under this part. (b) Each record of an inspection under the bridge management...

  12. Load rating of complex bridges.

    DOT National Transportation Integrated Search

    2010-07-01

    The National Bridge Inspection Standards require highway departments to inspect, evaluate, and determine load ratings for : structures defined as bridges located on all public roads. Load rating of bridges is performed to determine the live load that...

  13. Field performance of timber bridges. 8, Lynches Woods Park stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; D. Conger

    The Lynches Woods Park bridge was constructed during the summer of 1990 in Newberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that measures approximately 30 ft long, 16 ft wide, and 14 in. deep. The bridge is unique in that is one of the first known stress-laminated deck bridges to be constructed of Southern Pine lumber...

  14. Salt-Bridge Energetics in Halophilic Proteins

    PubMed Central

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K.

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are −3.0 kcal mol−1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of −5.0 kcal mol−1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (−10 kcal mol−1) exceeds than that of bridge term (−7 kcal mol−1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic

  15. Salt-bridge energetics in halophilic proteins.

    PubMed

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are -3.0 kcal mol-1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of -5.0 kcal mol-1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (-10 kcal mol-1) exceeds than that of bridge term (-7 kcal mol-1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic signature in its

  16. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; S. C. Catherman; R. G. Winnett

    In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation....

  17. Field performance of timber bridges. 14, Dean, Hibbsville, and Decatur stress-laminated deck bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; S. Golston; K. Hinds

    1984-01-01

    The Dean, Hibbsville, and Decatur bridges were constructed in southern Iowa during 1994. Each bridge is a simple-span, stress-laminated deck superstructure, approximately 7.3 m (24 ft) long, constructed from eastern cottonwood lumber. The performance of each bridge was monitored for approximately 2 years, beginning shortly after installation. Monitoring involved...

  18. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    DOT National Transportation Integrated Search

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  19. Two test level 4 bridge railing and transition systems for transverse timber deck bridges

    Treesearch

    Ronald K. Faller; Michael A. Ritter; Barry T. Rosson; Michael D. Fowler; Sheila R. Duwadi

    2000-01-01

    The Midwest Roadside Safety Facility, in cooperation with the Forest Products Laboratory, which is part of the U.S. Department of Agricultureas Forest Service, and FHWA, designed two bridge railing and approach guardrail transition systems for use on bridges with transverse glue-laminated timber decks. The bridge raging and transition systems were developed and crash...

  20. Geotextile reinforced bridge approach embankment : Lake River Bridge : Malin Highway , Klamath County, Oregon : construction report.

    DOT National Transportation Integrated Search

    1993-03-01

    The transition from the roadway to the deck of a rigidly supported bridge is of concern to engineers and the travelling public. It is a common occurrence to feel a discontinuity between the roadway and bridge structure. Bridge engineers have tried to...

  1. Bridge cable fracture detection with acoustic emission test (Conference Presentation)

    NASA Astrophysics Data System (ADS)

    Qu, Hongya; Li, Tiantian; Chen, Genda

    2017-04-01

    In this study, acoustic emission (AE) tests were conducted to detect and locate wire fracture in strands that are widely used in cable-stayed and suspension bridges. To effectively separate fracture signals from unwanted noises, distinct features of fracture, fracture-induced echo, and artificial tapping signals as well as their dependence on loading levels are characterized with short-time Fourier transform. To associate fracture scenarios with their acoustic features, two 20-foot-long ( 6.1 m) 270 ksi ( 1,862 MPa) steel strands of seven wires were tested with one wire notched off at center and support, respectively, up to 90% of its cross section area by 10% increment. Up to 80% reduction in cross section area of the notched wire, each strand was loaded to 20 kips ( 89 kN) corresponding to 35% of the minimum breaking strength and the acquired AE parameters such as hits, energy, and counts were found to change little. With a reduction of 90% of the section area of one wire, both strands were found to be fractured under approximately 16.5 kips ( 73.4 kN). The hits, energy, and counts of AE signals were all demonstrated to suddenly change with the fracture of the notched wire. However, only the counts of AE signals distributed over the length of the strands allow the localization of fracture point. The frequency band of fracture signals is significantly broader than that of either fracture-induced echo or artificial tapping noise. The time duration of artificial tapping noises is substantially longer than that of either fracture or fracture-induced echo. These distinct characteristics can be used to effectively separate fracture signals from noises for wire fracture detection and localization in practice.

  2. 49 CFR 237.103 - Bridge inspection procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge inspection procedures. 237.103 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.103 Bridge inspection procedures. (a) Each bridge management program shall specify the procedure to be used for...

  3. Temperature differential of swingspan bridges : final report.

    DOT National Transportation Integrated Search

    1969-06-01

    This report describes a study performed to determine the temperature differential of the top and bottom member of one side of a swingspan bridge. Three bridges were used in the study. Bridge No. 1 was an equal-arm swingspan bridge, Bridge No. 2 was a...

  4. 49 CFR 237.103 - Bridge inspection procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge inspection procedures. 237.103 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.103 Bridge inspection procedures. (a) Each bridge management program shall specify the procedure to be used for...

  5. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs.

    PubMed

    Ashley, Michael; Cooper, Katelyn M; Cala, Jacqueline M; Brownell, Sara E

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. © 2017 M. Ashley, K. M. Cooper, et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  6. Towards novel efficient and stable nuclear import signals: synthesis and properties of trimethylguanosine cap analogs modified within the 5',5'-triphosphate bridge.

    PubMed

    Zytek, Malgorzata; Kowalska, Joanna; Lukaszewicz, Maciej; Wojtczak, Blazej A; Zuberek, Joanna; Ferenc-Mrozek, Aleksandra; Darzynkiewicz, Edward; Niedzwiecka, Anna; Jemielity, Jacek

    2014-12-07

    A trimethylguanosine (TMG) cap is present at the 5' end of several small nuclear and nucleolar RNAs. Recently, it has been reported that the TMG cap is a potential nuclear import signal for nucleus-targeting therapeutic nucleic acids and proteins. The import is mediated by recognition of the TMG cap by the snRNA transporting protein, snurportin1. This work describes the synthesis and properties of a series of dinucleotide TMG cap (m3(2,2,7)GpppG) analogs modified in the 5',5'-triphosphate bridge as tools to study TMG cap-dependent biological processes. The bridge was altered at different positions by introducing either bridging (imidodiphosphate, O to NH and methylenebisphosphonate, O to CH2) or non-bridging (phosphorothioate, O to S and boranophosphate, O to BH3) modifications, or by elongation to tetraphosphate. The stability of novel analogs in blood serum was studied to reveal that the α,β-bridging O to NH substitution (m3(2,2,7)GppNHpG) confers the highest resistance. Short RNAs capped with analogs containing α,β-bridging (m3(2,2,7)GppNHpG) or β-non-bridging (m3(2,2,7)GppSpG D2) modifications were resistant to decapping pyrophosphatase, hNudt16. Preliminary studies on binding by human snurportin1 revealed that both O to NH and O to S substitutions support this binding. Due to favorable properties in all three assays, m3(2,2,7)GppNHpG was selected as a promising candidate for further studies on the efficiency of the TMG cap as a nuclear import signal.

  7. 23 CFR 650.307 - Bridge inspection organization.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Bridge inspection organization. 650.307 Section 650.307... BRIDGES, STRUCTURES, AND HYDRAULICS National Bridge Inspection Standards § 650.307 Bridge inspection... bridges located on public roads that are fully or partially located within the State's boundaries, except...

  8. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  9. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  10. Coupling vibration research on Vehicle-bridge system

    NASA Astrophysics Data System (ADS)

    Zhou, Jiguo; Wang, Guihua

    2018-01-01

    The vehicle-bridge coupling system forms when vehicle running on a bridge. It will generate a relatively large influence on the driving comfort and driving safe when the vibration of the vehicle is bigger. A three-dimensional vehicle-bridge system with biaxial seven degrees of freedom has been establish in this paper based on finite numerical simulation. Adopting the finite element transient numerical simulation to realize the numerical simulation of vehicle-bridge system coupling vibration. Then, analyze the dynamic response of vehicle and bridge while different numbers of vehicles running on the bridge. Got the variation rule of vertical vibration of car body and bridge, and that of the contact force between the wheel and bridge deck. The research results have a reference value for the analysis about the vehicle running on a large-span cabled bridge.

  11. Building Bridges to Independence: Proceedings of the National Conference: Employment Successes, Problems, & Needs of Black Americans with Disabilities (Washington, D.C., 1988).

    ERIC Educational Resources Information Center

    Walker, Sylvia, Ed.; And Others

    This conference was the first nationwide meeting focusing on issues concerning the employment of black Americans with disabilities. These issues are significant because one working-age black in seven has a disability. The conference goal was to explore ways to reduce or eliminate barriers to employment preparation services and to identify methods…

  12. Salt bridges: geometrically specific, designable interactions.

    PubMed

    Donald, Jason E; Kulp, Daniel W; DeGrado, William F

    2011-03-01

    Salt bridges occur frequently in proteins, providing conformational specificity and contributing to molecular recognition and catalysis. We present a comprehensive analysis of these interactions in protein structures by surveying a large database of protein structures. Salt bridges between Asp or Glu and His, Arg, or Lys display extremely well-defined geometric preferences. Several previously observed preferences are confirmed, and others that were previously unrecognized are discovered. Salt bridges are explored for their preferences for different separations in sequence and in space, geometric preferences within proteins and at protein-protein interfaces, co-operativity in networked salt bridges, inclusion within metal-binding sites, preference for acidic electrons, apparent conformational side chain entropy reduction on formation, and degree of burial. Salt bridges occur far more frequently between residues at close than distant sequence separations, but, at close distances, there remain strong preferences for salt bridges at specific separations. Specific types of complex salt bridges, involving three or more members, are also discovered. As we observe a strong relationship between the propensity to form a salt bridge and the placement of salt-bridging residues in protein sequences, we discuss the role that salt bridges might play in kinetically influencing protein folding and thermodynamically stabilizing the native conformation. We also develop a quantitative method to select appropriate crystal structure resolution and B-factor cutoffs. Detailed knowledge of these geometric and sequence dependences should aid de novo design and prediction algorithms. Copyright © 2010 Wiley-Liss, Inc.

  13. Active-bridge oscillator

    DOEpatents

    Wessendorf, Kurt O.

    2001-01-01

    An active bridge oscillator is formed from a differential amplifier where positive feedback is a function of the impedance of one of the gain elements and a relatively low value common emitter resistance. This use of the nonlinear transistor parameter h stabilizes the output and eliminates the need for ALC circuits common to other bridge oscillators.

  14. Bridging a cultural gap

    NASA Astrophysics Data System (ADS)

    Leviatan, Talma

    2008-09-01

    There has been a broad wave of change in tertiary calculus courses in the past decade. However, the much-needed change in tertiary pre-calculus programmes—aimed at bridging the gap between high-school mathematics and tertiary mathematics—is happening at a far slower pace. Following a discussion on the nature of the gap and the objectives of a potential bridging programme, this paper aims at demonstrating that the gap can be bridged, by presenting an ongoing modular bridging programme especially designed for the diverse types of student populations in teachers training colleges. We also present here some innovative teaching and assessment methods that were judged essential for the success of these programmes—focusing mainly on the "Questionnaire Based Instruction Method". Finally we suggest directions of follow up and research.

  15. Bridge inspector's manual for movable bridges.

    DOT National Transportation Integrated Search

    1977-01-01

    Importance of Inspection-Movable bridges are built to the rigid specifications : of such groups as the American Association of State Highway and : Transportation Officials (AASHTO), the American Road Builders Association : (ARBA) and Underwriters Lab...

  16. Movable bridge maintenance monitoring.

    DOT National Transportation Integrated Search

    2013-10-01

    Movable bridges have particular maintenance issues, which cost considerably more than those of fixed bridges, : mostly because of the complex interaction of the mechanical, electrical and structural components. In order to track : maintenance and ope...

  17. Characterization of stormwater runoff from bridges in North Carolina and the effects of bridge runoff on receiving streams

    USGS Publications Warehouse

    Wagner, Chad; Fitzgerald, Sharon; Lauffer, Matthew

    2015-01-01

    The presentation will provide an overview of a collaborative study between USGS, NC Department of Transportation and URS Corporation to characterize stormwater runoff from bridges in North Carolina and the effects of bridge runoff on receiving streams. This investigation measured bridge deck runoff from 15 bridges for 12-15 storms, stream water-quality data for baseflow and storm conditions at four of the bridge deck sites and streambed sediment chemistry upstream and downstream of 30 bridges across North Carolina. Background on why the study was conducted, objectives and scope and a general summary of the major results and conclusions will be presented.

  18. Bridge element deterioration rates.

    DOT National Transportation Integrated Search

    2008-10-01

    This report describes the development of bridge element deterioration rates using the NYSDOT : bridge inspection database using Markov chains and Weibull-based approaches. It is observed : that Weibull-based approach is more reliable for developing b...

  19. Bridge deck wearing surfaces.

    DOT National Transportation Integrated Search

    2010-11-01

    Several commercially available bridge deck overlay systems claim to be waterproof and reduce deterioration caused by chloride laden water from penetrating concrete bridge decks. An attempt was made to quantify the in-service waterproofing qualities o...

  20. Bridge-Vehicle Impact Assessment

    DOT National Transportation Integrated Search

    2011-08-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  1. Bridge vehicle impact assessment.

    DOT National Transportation Integrated Search

    2011-12-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  2. Wireless Smart Sensor Network System Using SmartBridge Sensor Nodes for Structural Health Monitoring of Existing Concrete Bridges

    NASA Astrophysics Data System (ADS)

    Gaviña, J. R.; Uy, F. A.; Carreon, J. D.

    2017-06-01

    There are over 8000 bridges in the Philippines today according to the Department of Public Works and Highways (DPWH). Currently, visual inspection is the most common practice in monitoring the structural integrity of bridges. However, visual inspections have proven to be insufficient in determining the actual health or condition of a bridge. Structural Health Monitoring (SHM) aims to give, in real-time, a diagnosis of the actual condition of the bridge. In this study, SmartBridge Sensor Nodes were installed on an existing concrete bridge with American Association of State Highway and Transportation Officials (AASHTO) Type IV Girders to gather vibration of the elements of the bridge. Also, standards on the effective installation of SmartBridge Sensor Nodes, such as location and orientation was determined. Acceleration readings from the sensor were then uploaded to a server, wherein they are monitored against certain thresholds, from which, the health of the bridge will be derived. Final output will be a portal or webpage wherein the information, health, and acceleration readings of the bridge will be available for viewing. With levels of access set for different types of users, the main users will have access to download data and reports. Data transmission and webpage access are available online, making the SHM system wireless.

  3. Akashi-Kaikyo Bridge, Japan

    NASA Image and Video Library

    2015-08-10

    The Akashi Kaikyo Bridge in Japan has the longest central span of any suspension bridge in the world at 1991 m. The total length of the bridge is 3911 m. It links the city of Kobe on the mainland of Honshu to Iwaya on Awaji Island, crossing the busy Akashi Strait. The image was acquired April 26, 2014, covers an area of 8.1 by 11.2 km, and is located at 34.6 degrees north, 135 degrees east. http://photojournal.jpl.nasa.gov/catalog/PIA19747

  4. PREFACE: 2nd International Conference and Young Scientist School ''Magnetic resonance imaging in biomedical research''

    NASA Astrophysics Data System (ADS)

    Naumova, A. V.; Khodanovich, M. Y.; Yarnykh, V. L.

    2016-02-01

    The Second International Conference and Young Scientist School ''Magnetic resonance imaging in biomedical research'' was held on the campus of the National Research Tomsk State University (Tomsk, Russia) on September 7-9, 2015. The conference was focused on magnetic resonance imaging (MRI) applications for biomedical research. The main goal was to bring together basic scientists, clinical researchers and developers of new MRI techniques to bridge the gap between clinical/research needs and advanced technological solutions. The conference fostered research and development in basic and clinical MR science and its application to health care. It also had an educational purpose to promote understanding of cutting-edge MR developments. The conference provided an opportunity for researchers and clinicians to present their recent theoretical developments, practical applications, and to discuss unsolved problems. The program of the conference was divided into three main topics. First day of the conference was devoted to educational lectures on the fundamentals of MRI physics and image acquisition/reconstruction techniques, including recent developments in quantitative MRI. The second day was focused on developments and applications of new contrast agents. Multinuclear and spectroscopic acquisitions as well as functional MRI were presented during the third day of the conference. We would like to highlight the main developments presented at the conference and introduce the prominent speakers. The keynote speaker of the conference Dr. Vasily Yarnykh (University of Washington, Seattle, USA) presented a recently developed MRI method, macromolecular proton fraction (MPF) mapping, as a unique tool for modifying image contrast and a unique tool for quantification of the myelin content in neural tissues. Professor Yury Pirogov (Lomonosov Moscow State University) described development of new fluorocarbon compounds and applications for biomedicine. Drs. Julia Velikina and Alexey

  5. BUILDING A BETTER GLUTEAL BRIDGE: ELECTROMYOGRAPHIC ANALYSIS OF HIP MUSCLE ACTIVITY DURING MODIFIED SINGLE-LEG BRIDGES.

    PubMed

    Lehecka, B J; Edwards, Michael; Haverkamp, Ryan; Martin, Lani; Porter, Kambry; Thach, Kailey; Sack, Richard J; Hakansson, Nils A

    2017-08-01

    Gluteal strength plays a role in injury prevention, normal gait patterns, eliminating pain, and enhancing athletic performance. Research shows high gluteal muscle activity during a single-leg bridge compared to other gluteal strengthening exercises; however, prior studies have primarily measured muscle activity with the active lower extremity starting in 90 ° of knee flexion with an extended contralateral knee. This standard position has caused reports of hamstring cramping, which may impede optimal gluteal strengthening. The purpose of this study was to determine which modified position for the single-leg bridge is best for preferentially activating the gluteus maximus and medius. Cross-Sectional. Twenty-eight healthy males and females aged 18-30 years were tested in five different, randomized single-leg bridge positions. Electromyography (EMG) electrodes were placed on subjects' gluteus maximus, gluteus medius, rectus femoris, and biceps femoris of their bridge leg (i.e., dominant or kicking leg), as well as the rectus femoris of their contralateral leg. Subjects performed a maximal voluntary isometric contraction (MVIC) for each tested muscle prior to performing five different bridge positions in randomized order. All bridge EMG data were normalized to the corresponding muscle MVIC data. A modified bridge position with the knee of the bridge leg flexed to 135 ° versus the traditional 90 ° of knee flexion demonstrated preferential activation of the gluteus maximus and gluteus medius compared to the traditional single-leg bridge. Hamstring activation significantly decreased (p < 0.05) when the dominant knee was flexed to 135 ° (23.49% MVIC) versus the traditional 90 ° (75.34% MVIC), while gluteal activation remained similarly high (51.01% and 57.81% MVIC in the traditional position, versus 47.35% and 57.23% MVIC in the modified position for the gluteus maximus and medius, respectively). Modifying the traditional single-leg bridge by flexing the

  6. 23 CFR 650.409 - Evaluation of bridge inventory.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.409 Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge...

  7. 23 CFR 650.409 - Evaluation of bridge inventory.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.409 Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge...

  8. Chemistry of electronic ceramic materials. Proceedings of the International Conference on the Chemistry of Electronic Ceramic Materials

    NASA Technical Reports Server (NTRS)

    Davies, P. K.; Roth, R. S.

    1991-01-01

    The conference was held at Jackson Hole, Wyoming from August 17 to 22, 1990, and in an attempt to maximize the development of this rapidly moving, multidisciplinary field, this conference brought together major national and international researchers to bridge the gap between those primarily interested in the pure chemistry of inorganic solids and those interested in the physical and electronic properties of ceramics. With the many major discoveries that have occurred over the last decade, one of the goals of this meeting was to evaluate the current understanding of the chemistry of electronic ceramic materials, and to assess the state of a field that has become one of the most important areas of advanced materials research. The topics covered include: crystal chemistry; dielectric ceramics; low temperature synthesis and characterization; solid state synthesis and characterization; surface chemistry; superconductors; theory and modeling.

  9. Developing deterioration models for Nebraska bridges.

    DOT National Transportation Integrated Search

    2011-07-01

    Nebraska Bridge Management System (NBMS) was developed in 1999 to assist in optimizing budget allocation for : the maintenance, rehabilitation and replacement needs of highway bridges. This requires the prediction of bridge : deterioration to calcula...

  10. Movable bridge maintenance monitoring : [technical summary].

    DOT National Transportation Integrated Search

    2013-10-01

    Maintenance costs for movable bridges are considerably higher than for fixed bridges, mostly because of the complex interaction of mechanical, electrical, and structural components. Malfunction of any component can cause unexpected failure of bridge ...

  11. LTBP bridge performance primer.

    DOT National Transportation Integrated Search

    2013-12-01

    "The performance of bridges is critical to the overall performance of the highway transportation system in the United States. However, many critical aspects of bridge performance are not well understood. The reasons for this include the extreme diver...

  12. Newport Pell Bridge traffic and revenue study

    DOT National Transportation Integrated Search

    2010-01-12

    Jacobs Engineering conducted a traffic and toll revenue study for the Claiborne Pell Newport Bridge : (Newport Pell Bridge or Pell Bridge) upon the request of the Rhode Island Turnpike and Bridge : Authority (RITBA). This study is being c...

  13. 33 CFR 115.70 - Advance approval of bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Advance approval of bridges. 115... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.70 Advance approval of bridges. (a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior...

  14. 33 CFR 115.70 - Advance approval of bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Advance approval of bridges. 115... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.70 Advance approval of bridges. (a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior...

  15. 76 FR 64083 - Reliability Technical Conference; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Technical Conference; Notice of Technical Conference Take notice that the Federal Energy Regulatory Commission will hold a Technical Conference on Tuesday, November 29, 2011, from 1 p.m. to 5 p.m. and... System. The conference will explore the progress made on the priorities for addressing risks to...

  16. Temporary bridge deck panels.

    DOT National Transportation Integrated Search

    2009-03-01

    The research described here has resulted in the development of a simplistic and innovative interlocking : glulam bridge deck panel for use in temporary bridge deck applications. The key feature of this panel : system is the interlocking tongue and gr...

  17. Bridge Scour Technology Transfer

    DOT National Transportation Integrated Search

    2018-01-24

    Scour and flooding are the leading causes of bridge failures in the United States and therefore should be monitored. New applications of tools and technologies are being developed, tested, and implemented to reduce bridge scour risk. The National Coo...

  18. Chesapeake City Bridge. Bridge Inspection Report Number 11B.

    DTIC Science & Technology

    1979-12-01

    recommendations for th 1979 inspection of the Chesapeake City Bridge (Route designation , U.S. Route 213) which crosses the Chesappake and Delaware Canal...Los Arg4 .PASN4 . Mrkee. g14neaoos. Nevr,,r DE . Now York Oemnfto, overland PWn KS. Fh ~M% S0.mo- Tamp, TW=. F wia AMot ho d Jl 4O T, - kv Col. James G...1979 inspection of the Chesapeake City Bridge (Route designation , U.S. Route 213) which crosses the Chesapeake and Delaware Canal was undertaken for the

  19. Development of a sustainable UHPC bridge deck for movable bridges : [research project capsule].

    DOT National Transportation Integrated Search

    2015-11-01

    Louisiana has approximately 160 movable bridges, mostly in the southern part of the state, which : places Louisiana among states with the highest inventory of movable bridges in the nation. These : transportation arteries are important for the econom...

  20. 49 CFR 236.766 - Locking, movable bridge.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Locking, movable bridge. 236.766 Section 236.766... Locking, movable bridge. The rail locks, bridge locks, bolt locks, circuit controllers, and electric locks used in providing interlocking protection at a movable bridge. ...

  1. 49 CFR 236.766 - Locking, movable bridge.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Locking, movable bridge. 236.766 Section 236.766... Locking, movable bridge. The rail locks, bridge locks, bolt locks, circuit controllers, and electric locks used in providing interlocking protection at a movable bridge. ...

  2. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction : research brief

    DOT National Transportation Integrated Search

    2017-09-01

    This study is to develop simulation methodology to conduct the dynamic assessment of bridge deck performance subjected to traffic. Concrete bridge decks are exposed to daily traffic loads and may experience some surface cracking caused by excessive s...

  3. Development of a precast bridge deck overhang system for the rock creek bridge.

    DOT National Transportation Integrated Search

    2008-12-01

    Precast, prestressed panels are commonly used at interior beams for bridges in Texas. The use of these : panels provides ease of construction, sufficient capacity, and good economy for the construction of : bridges in Texas. Current practice for the ...

  4. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    DOT National Transportation Integrated Search

    2011-04-01

    The purpose of this research was to characterize the performance of High Strength Lightweight Concrete (HSLW) in precast, prestressed bridge girders and to evaluate their performance in a highway bridge. The mechanical properties and long-term time-d...

  5. Bridging: Locating Critical Connectors in a Network

    PubMed Central

    Valente, Thomas W.; Fujimoto, Kayo

    2010-01-01

    This paper proposes several measures for bridging in networks derived from Granovetter's (1973) insight that links which reduce distances in a network are important structural bridges. Bridging is calculated by systematically deleting links and calculating the resultant changes in network cohesion (measured as the inverse average path length). The average change for each node's links provides an individual level measure of bridging. We also present a normalized version which controls for network size and a network level bridging index. Bridging properties are demonstrated on hypothetical networks, empirical networks, and a set of 100 randomly generated networks to show how the bridging measure correlates with existing network measures such as degree, personal network density, constraint, closeness centrality, betweenness centrality, and vitality. Bridging and the accompanying methodology provide a family of new network measures useful for studying network structure, network dynamics, and network effects on substantive behavioral phenomenon. PMID:20582157

  6. Field performance of timber bridges. 13, Mohawk Canal stress-laminated bridge

    Treesearch

    P. D. Hilbrich Lee; X. Lauderdale

    The Mohawk Canal bridge was constructed in August 1994, just outside Roll, Arizona. It is a simple-span, double-lane, stress-laminated deck superstructure, approximately 6.4 m (21 ft) long and 10.4 m (34 ft) wide and constructed with Combination 16F-V3 Douglas Fir glued-laminated timber beam laminations. The performance of the bridge was monitored continuously for 2...

  7. Development of inspection robots for bridge cables.

    PubMed

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  8. Bridging knowledge, policies and practices across the ageing and disability fields: a protocol for a scoping review to inform the development of a taxonomy.

    PubMed

    Nalder, Emily Joan; Putnam, Michelle; Salvador-Carulla, Luis; Spindel, Andria; Batliwalla, Zinnia; Lenton, Erica

    2017-10-25

    Bridging is a term used to describe activities, or tasks, used to promote collaboration and knowledge exchange across fields. This paper reports the protocol for a scoping review which aims to identify and characterise peer reviewed evidence describing bridging activities, between the ageing and disability fields. The purpose is to clarify the concepts underpinning bridging to inform the development of a taxonomy, and identify research strengths and gaps. A scoping review will be conducted. We will search Medline, Cumulative Index to Nursing and Allied Health Literature, Embase, PsycInfo, Sociological Abstracts and the Cochrane Library, to identify peer reviewed publications (reviews, experimental, observational, qualitative designs and expert commentaries) describing bridging activities. Grey literature, and articles not published in English will be excluded. Two investigators will independently complete article selection and data abstraction to minimise bias. A data extraction form will be iteratively developed and information from each publication will be extracted: (1) bibliographic, (2) methodological, (3) demographic, and (4) bridging information. Qualitative content analysis will be used to describe key concepts related to bridging. To our knowledge, this will be the first scoping review to describe bridging of ageing and disability knowledge, services and policies. The findings will inform the development of a taxonomy to define models of bridging that can be implemented and further evaluated to enable integrated care and improve systems and services for those ageing with disability. Ethics is not required because this is a scoping review of published literature. Findings will be disseminated through stakeholder meetings, conference presentations and peer reviewed publication. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly

  9. Spread prestressed concrete slab beam bridges.

    DOT National Transportation Integrated Search

    2015-04-01

    TxDOT uses prestressed slab beam bridges for short-span bridges ranging from approximately 3050 ft in : length. These bridges have precast, pretensioned slab beams placed immediately adjacent to one another : with a cast-in-place slab made composi...

  10. Lean Construction Applications for Bridge Inspection

    DOT National Transportation Integrated Search

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  11. 77 FR 16784 - General Bridge Regulation; Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ...] RIN 1625-AB36 General Bridge Regulation; Amendment AGENCY: Coast Guard, DHS. ACTION: Proposed rule... bridge regulations. The rulemaking was initiated to clarify the statutory responsibilities of bridge owners to remove their bridges from navigable waterways when they are no longer being used for land...

  12. Hydrodynamic forces on inundated bridge decks

    DOT National Transportation Integrated Search

    2009-05-01

    The hydrodynamic forces experienced by an inundated bridge deck have great importance in the design of bridges. Specifically, the drag force, lift force, and the moment acting on the bridge deck under various levels of inundation and a range of flow ...

  13. Hydraulic forces on submerged bridge decks.

    DOT National Transportation Integrated Search

    2008-09-01

    Bridge decks can be subjected to large horizontal forces when overtopping occurs. These forces may result in the displacement of bridge decks from the bents. This paper reports on the results of a laboratory study of horizontal forces on bridge decks...

  14. 10 CFR 501.32 - Conferences (other than prepetition conferences).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Conferences (other than prepetition conferences). 501.32 Section 501.32 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS ADMINISTRATIVE PROCEDURES AND SANCTIONS Written Comments, Public Hearings and Conferences During Administrative Proceedings § 501.32...

  15. Development of Inspection Robots for Bridge Cables

    PubMed Central

    Kim, Se-Hoon; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented. PMID:24459453

  16. 49 CFR 237.55 - Railroad bridge supervisors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge supervisors. 237.55 Section 237.55..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.55 Railroad bridge supervisors. A railroad bridge supervisor shall be a person, regardless of...

  17. 23 CFR 650.307 - Bridge inspection organization.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... bridges located on public roads that are fully or partially located within the State's boundaries, except... inspected, all highway bridges located on public roads that are fully or partially located within the... preparation and maintenance of a bridge inventory. (2) Bridge inspections, reports, load ratings and other...

  18. 49 CFR 237.55 - Railroad bridge supervisors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge supervisors. 237.55 Section 237.55..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.55 Railroad bridge supervisors. A railroad bridge supervisor shall be a person, regardless of...

  19. The South Carolina bridge-scour envelope curves

    USGS Publications Warehouse

    Benedict, Stephen T.; Feaster, Toby D.; Caldwell, Andral W.

    2016-09-30

    The U.S. Geological Survey, in cooperation with the South Carolina Department of Transportation, conducted a series of three field investigations to evaluate historical, riverine bridge scour in the Piedmont and Coastal Plain regions of South Carolina. These investigations included data collected at 231 riverine bridges, which lead to the development of bridge-scour envelope curves for clear-water and live-bed components of scour. The application and limitations of the South Carolina bridge-scour envelope curves were documented in four reports, each report addressing selected components of bridge scour. The current investigation (2016) synthesizes the findings of these previous reports into a guidance manual providing an integrated procedure for applying the envelope curves. Additionally, the investigation provides limited verification for selected bridge-scour envelope curves by comparing them to field data collected outside of South Carolina from previously published sources. Although the bridge-scour envelope curves have limitations, they are useful supplementary tools for assessing the potential for scour at riverine bridges in South Carolina.

  20. Stabilization of electrically conducting capillary bridges using feedback control of radial electrostatic stresses and the shapes of extended bridges

    NASA Astrophysics Data System (ADS)

    Marr-Lyon, Mark J.; Thiessen, David B.; Blonigen, Florian J.; Marston, Philip L.

    2000-05-01

    Electrically conducting, cylindrical liquid bridges in a density-matched, electrically insulating bath were stabilized beyond the Rayleigh-Plateau (RP) limit using electrostatic stresses applied by concentric ring electrodes. A circular liquid cylinder of length L and radius R in real or simulated zero gravity becomes unstable when the slenderness S=L/2R exceeds π. The initial instability involves the growth of the so-called (2, 0) mode of the bridge in which one side becomes thin and the other side rotund. A mode-sensing optical system detects the growth of the (2, 0) mode and an analog feedback system applies the appropriate voltages to a pair of concentric ring electrodes positioned near the ends of the bridge in order to counter the growth of the (2, 0) mode and prevent breakup of the bridge. The conducting bridge is formed between metal disks which are grounded. Three feedback algorithms were tested and each found capable of stabilizing a bridge well beyond the RP limit. All three algorithms stabilized bridges having S as great as 4.3 and the extended bridges broke immediately when feedback was terminated. One algorithm was suitable for stabilization approaching S=4.493… where the (3, 0) mode is predicted to become unstable for cylindrical bridges. For that algorithm the equilibrium shapes of bridges that were slightly under or over inflated corresponded to solutions of the Young-Laplace equation with negligible electrostatic stresses. The electrical conductivity of the bridge liquid need not be large. The conductivity was associated with salt added to the aqueous bridge liquid.

  1. Satellite Conferences

    Science.gov Websites

    NOAA- NESDIS Banner Satellite Conferences Collage images of earth, POES and GOES satellites in space HOME Call for Poster Abstracts DOC Logo NOAA Logo Satellite Conferences Welcome to the website for National Oceanic and Atmospheric Administration (NOAA) Satellite Conferences; past, present and future

  2. 33 CFR 118.140 - Painting bridge piers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Painting bridge piers. 118.140 Section 118.140 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.140 Painting bridge piers. The District Commander may require...

  3. 49 CFR 237.53 - Railroad bridge inspectors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge inspectors. 237.53 Section 237.53..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.53 Railroad bridge inspectors. A railroad bridge inspector shall be a person who is determined by...

  4. 33 CFR 118.140 - Painting bridge piers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Painting bridge piers. 118.140 Section 118.140 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.140 Painting bridge piers. The District Commander may require...

  5. 49 CFR 237.53 - Railroad bridge inspectors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge inspectors. 237.53 Section 237.53..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.53 Railroad bridge inspectors. A railroad bridge inspector shall be a person who is determined by...

  6. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  7. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  8. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  9. Bridge scour monitoring technologies : development of evaluation and selection protocols for application on river bridges in Minnesota.

    DOT National Transportation Integrated Search

    2010-03-01

    Bridge failure or loss of structural integrity can result from scour of riverbed sediment near bridge abutments or : piers during high-flow events in rivers. In the past 20 years, several methods of monitoring bridge scour have been : developed spann...

  10. Simplified bridge load rating methodology using the national bridge inventory file : user manual

    DOT National Transportation Integrated Search

    1988-08-01

    The purpose of this research was to develop a computerized system to determine the adequacy of a bridge or group of bridges to carry specified overload vehicles. The system utilizes two levels of analysis. The Level 1 analysis is the basic rating sys...

  11. Simplified bridge load rating methodology using the national bridge inventory file : program listing

    DOT National Transportation Integrated Search

    1987-08-01

    The purpose of this research was to develop a computerized system to determine the adequacy of a bridge or group of bridges to carry specified overload vehicles. The system utilizes two levels of analysis. The Level 1 analysis is the basic rating sys...

  12. Bridge deficiency metric refinement : longer-term planning for state and locally-owned bridges.

    DOT National Transportation Integrated Search

    2010-06-01

    The focus of this study was to devise a prioritization scheme for locally-owned bridges and to extend the planning time horizon for state-owned bridges. The inherent nature of the local and county structures prevents a direct application of the formu...

  13. 49 CFR 236.713 - Bridge, movable.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge, movable. 236.713 Section 236.713 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Bridge, movable. That section of a structure bridging a navigable waterway so designed that it may be...

  14. 49 CFR 236.713 - Bridge, movable.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge, movable. 236.713 Section 236.713 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Bridge, movable. That section of a structure bridging a navigable waterway so designed that it may be...

  15. 33 CFR 118.90 - Bridges crossing channel obliquely.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Bridges crossing channel obliquely. 118.90 Section 118.90 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.90 Bridges crossing channel obliquely. Bridges...

  16. 49 CFR 237.107 - Conduct of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Conduct of bridge inspections. 237.107 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.107 Conduct of bridge inspections. Bridge inspections shall be conducted under the direct supervision of a designated...

  17. 33 CFR 118.90 - Bridges crossing channel obliquely.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Bridges crossing channel obliquely. 118.90 Section 118.90 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.90 Bridges crossing channel obliquely. Bridges...

  18. 49 CFR 237.107 - Conduct of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Conduct of bridge inspections. 237.107 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.107 Conduct of bridge inspections. Bridge inspections shall be conducted under the direct supervision of a designated...

  19. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  20. Bridge deck fogging system : evaluation of field implementation of a fogging system used during bridge deck construction.

    DOT National Transportation Integrated Search

    2008-01-01

    The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed usi...

  1. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. 165.1187 Section 165.1187... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. (a) Location. All waters extending...

  2. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. 165.1187 Section 165.1187... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. (a) Location. All waters extending...

  3. Reliability Modeling of Double Beam Bridge Crane

    NASA Astrophysics Data System (ADS)

    Han, Zhu; Tong, Yifei; Luan, Jiahui; Xiangdong, Li

    2018-05-01

    This paper briefly described the structure of double beam bridge crane and the basic parameters of double beam bridge crane are defined. According to the structure and system division of double beam bridge crane, the reliability architecture of double beam bridge crane system is proposed, and the reliability mathematical model is constructed.

  4. LIGHT BRIDGE IN A DEVELOPING ACTIVE REGION. I. OBSERVATION OF LIGHT BRIDGE AND ITS DYNAMIC ACTIVITY PHENOMENA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toriumi, Shin; Katsukawa, Yukio; Cheung, Mark C. M., E-mail: shin.toriumi@nao.ac.jp

    Light bridges, the bright structures that divide the umbra of sunspots and pores into smaller pieces, are known to produce a wide variety of activity events in solar active regions (ARs). It is also known that the light bridges appear in the assembling process of nascent sunspots. The ultimate goal of this series of papers is to reveal the nature of light bridges in developing ARs and the occurrence of activity events associated with the light bridge structures from both observational and numerical approaches. In this first paper, exploiting the observational data obtained by Hinode, the Interface Region Imaging Spectrograph, andmore » the Solar Dynamics Observatory, we investigate the detailed structure of the light bridge in NOAA AR 11974 and its dynamic activity phenomena. As a result, we find that the light bridge has a weak, horizontal magnetic field, which is transported from the interior by a large-scale convective upflow and is surrounded by strong, vertical fields of adjacent pores. In the chromosphere above the bridge, a transient brightening occurs repeatedly and intermittently, followed by a recurrent dark surge ejection into higher altitudes. Our analysis indicates that the brightening is the plasma heating due to magnetic reconnection at lower altitudes, while the dark surge is the cool, dense plasma ejected from the reconnection region. From the observational results, we conclude that the dynamic activity observed in a light bridge structure such as chromospheric brightenings and dark surge ejections are driven by magnetoconvective evolution within the light bridge and its interaction with the surrounding magnetic fields.« less

  5. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on fixed bridges. 118.65 Section 118.65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable...

  6. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on swing bridges. 118.70 Section 118.70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each...

  7. Bridges and Equipment

    DTIC Science & Technology

    2009-09-15

    in.) Tire pressure +7 kPa (+1 psig) Ambient or chamber temperature +2 °C (+3.6 °F) Relative humidity (RH) +1% reading Wind speed +1 kt Distance... eccentric ), and number of bridge crossings. (4) Vehicle stopping data including speed, position, and direction on the bridge. (5) Ambient...fashion for initial trials, and then loads should be applied eccentrically . The load configuration as it was applied to the raft will be documented

  8. A data management infrastructure for bridge monitoring

    NASA Astrophysics Data System (ADS)

    Jeong, Seongwoon; Byun, Jaewook; Kim, Daeyoung; Sohn, Hoon; Bae, In Hwan; Law, Kincho H.

    2015-04-01

    This paper discusses a data management infrastructure framework for bridge monitoring applications. As sensor technologies mature and become economically affordable, their deployment for bridge monitoring will continue to grow. Data management becomes a critical issue not only for storing the sensor data but also for integrating with the bridge model to support other functions, such as management, maintenance and inspection. The focus of this study is on the effective data management of bridge information and sensor data, which is crucial to structural health monitoring and life cycle management of bridge structures. We review the state-of-the-art of bridge information modeling and sensor data management, and propose a data management framework for bridge monitoring based on NoSQL database technologies that have been shown useful in handling high volume, time-series data and to flexibly deal with unstructured data schema. Specifically, Apache Cassandra and Mongo DB are deployed for the prototype implementation of the framework. This paper describes the database design for an XML-based Bridge Information Modeling (BrIM) schema, and the representation of sensor data using Sensor Model Language (SensorML). The proposed prototype data management framework is validated using data collected from the Yeongjong Bridge in Incheon, Korea.

  9. Standard practice for washing and cleaning concrete bridge decks and substructure bridge seats including bridge bearings and expansion joints to prevent structural deterioration.

    DOT National Transportation Integrated Search

    2013-12-01

    This study is a supplement to a previous study of bridge washing practices that focused on steel : superstructures. This study examined the perceived costs and benefits of routine washing of both : steel and concrete bridges, with emphasis on substru...

  10. Virtual Bridge Design Challenge

    ERIC Educational Resources Information Center

    Mitts, Charles R.

    2013-01-01

    This design/problem-solving activity challenges students to design a replacement bridge for one that has been designated as either structurally deficient or functionally obsolete. The Aycock MS Technology/STEM Magnet Program Virtual Bridge Design Challenge is an authentic introduction to the engineering design process. It is a socially relevant…

  11. Strengthening bridges using composite materials.

    DOT National Transportation Integrated Search

    1998-03-01

    The objective of this research project is to outline methodologies for using Fiber Reinforced Polymer (FRP) composites to strengthen and rehabilitate reinforced concrete bridge elements. : Infrastructure deterioration and bridge strengthening techniq...

  12. 49 CFR 237.111 - Review of bridge inspection reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Review of bridge inspection reports. 237.111... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.111 Review of bridge inspection reports. Bridge inspection reports shall be reviewed by railroad bridge supervisors and railroad...

  13. 49 CFR 237.111 - Review of bridge inspection reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Review of bridge inspection reports. 237.111... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.111 Review of bridge inspection reports. Bridge inspection reports shall be reviewed by railroad bridge supervisors and railroad...

  14. Preservation treatment for wood bridge application

    Treesearch

    Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf

    2009-01-01

    Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...

  15. Remediation: Higher Education's Bridge to Nowhere

    ERIC Educational Resources Information Center

    Complete College America, 2012

    2012-01-01

    The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…

  16. Characterization of stormwater runoff from bridges in North Carolina and the effects of bridge deck runoff on receiving streams

    USGS Publications Warehouse

    Wagner, Chad R.; Fitzgerald, Sharon A.; Sherrell, Roy D.; Harned, Douglas A.; Staub, Erik L.; Pointer, Brian H.; Wehmeyer, Loren L.

    2011-01-01

    In 2008, the North Carolina General Assembly passed House Bill 2436 that required the North Carolina Department of Transportation (NCDOT) to study the water-quality effects of bridges on receiving streams. In response, the NCDOT and the U.S. Geological Survey (USGS) collaborated on a study to provide information necessary to address the requirements of the Bill. To better understand the effects of stormwater runoff from bridges on receiving streams, the following tasks were performed: (1) characterize stormwater runoff quality and quantity from a representative selection of bridges in North Carolina; (2) measure stream water quality upstream from selected bridges to compare bridge deck stormwater concentrations and loads to stream constituent concentrations and loads; and (3) determine if the chemistry of bed sediments upstream and downstream from selected bridges differs substantially based on presence or absence of a best management practice for bridge runoff.

  17. Estimation of potential bridge scour at bridges on state routes in South Dakota, 2003-07

    USGS Publications Warehouse

    Thompson, Ryan F.; Fosness, Ryan L.

    2008-01-01

    Flowing water can erode (scour) soils and cause structural failure of a bridge by exposing or undermining bridge foundations (abutments and piers). A rapid scour-estimation technique, known as the level-1.5 method and developed by the U.S. Geological Survey, was used to evaluate potential scour at bridges in South Dakota in a study conducted in cooperation with the South Dakota Department of Transportation. This method was used during 2003-07 to estimate scour for the 100-year and 500-year floods at 734 selected bridges managed by the South Dakota Department of Transportation on State routes in South Dakota. Scour depths and other parameters estimated from the level-1.5 analyses are presented in tabular form. Estimates of potential contraction scour at the 734 bridges ranged from 0 to 33.9 feet for the 100-year flood and from 0 to 35.8 feet for the 500-year flood. Abutment scour ranged from 0 to 36.9 feet for the 100-year flood and from 0 to 45.9 feet for the 500-year flood. Pier scour ranged from 0 to 30.8 feet for the 100-year flood and from 0 to 30.7 feet for the 500-year flood. The scour depths estimated by using the level-1.5 method can be used by the South Dakota Department of Transportation and others to identify bridges that may be susceptible to scour. Scour at 19 selected bridges also was estimated by using the level-2 method. Estimates of contraction, abutment, and pier scour calculated by using the level-1.5 and level-2 methods are presented in tabular and graphical formats. Compared to level-2 scour estimates, the level-1.5 method generally overestimated scour as designed, or in a few cases slightly underestimated scour. Results of the level-2 analyses were used to develop regression equations for change in head and average velocity through the bridge opening. These regression equations derived from South Dakota data are compared to similar regression equations derived from Montana and Colorado data. Future level-1.5 scour investigations in South

  18. Investigation of Aerodynamic Interference between Twin Deck Bridges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitek, M. A.; Bojanowski, C.; Lottes, S. A.

    2016-05-01

    Construction of a twin bridge can be a cost effective and minimally disruptive way to increase capacity when an existing bridge is not near the end of its service life. With ever growing vehicular traffic, when demand approaches the capacity of many existing roads and bridges. Remodeling a structure with an insufficient number of lanes can be a good solution in case of smaller and less busy bridges. Closing down or reducing traffic on crossings of greater importance for the construction period, however, can result in major delays and revenue loss for commerce and transportation as well as increasing themore » traffic load on alternate route bridges. Multiple-deck bridges may be the answer to this issue. A parallel deck can be built next to the existing one, without reducing the flow. Additionally, a new bridge can be designed as a twin or multi-deck structure. Several such structures have been built throughout the United States, among them: - The New NY Bridge Project - the Tappan Zee Hudson River Crossing, - SR-182 Columbia River Bridge, - The Thaddeus Kosciusko Bridge (I-87), - The Allegheny River Bridge, Pennsylvania, which carries I76, - Fred Hartman Bridge, TX, see Figure 1.2. With a growing number of double deck bridges, additional, more detailed, studies on the interaction of such bridge pairs in windy conditions appears appropriate. Aerodynamic interference effects should be examined to assure the aerodynamic stability of both bridges. There are many studies on aerodynamic response of single deck bridges, but the literature on double-deck structures is not extensive. The experimental results from wind tunnels are still limited in number, as a parametric study is required, they can be very time consuming. Literature review shows that some investigation of the effects of gap-width and angle of wind incidence has been done. Most of the CFD computational studies that have been done were limited to 2D simulations. Therefore, it is desirable to investigate twin

  19. Penile skin bridges: causes and prevention.

    PubMed

    Kamal, Baher A

    2009-01-01

    The pathogenesis and methods of prevention of penile skin bridges are discussed, with a review of the literature. This was a retrospective study on 57 adult men who presented with penile skin bridges at King Fahd University Hospital, Khobar, Saudi Arabia, over a period of approximately 22 years. All patients gave a history of circumcision during the first month after birth. The bridges were surgically excised. The skin bridges were single (23 patients) or multiple (34 patients). Their edges were attached to the distal penile shaft proximally and the glans distally. Their width varied from 1 mm to 3 cm. They were all successfully excised under local or general anesthesia. Penile skin bridges are a rare complication of neonatal circumcision. They are caused by skin adhesions that occur during childhood. With aging, the adhesions separate partially at the corona to form bridges. Careful suturing and good dressing at the time of circumcision are simple procedures that can prevent adherence of the distal prepetual skin flap to the glans penis.

  20. Structural health monitoring of Lindquist bridge

    NASA Astrophysics Data System (ADS)

    Sargent, D. D.; Murison, E. R.; Bakht, B.; Mufti, A. A.

    2007-04-01

    Many forestry bridges in Canada are typically single-lane, single span structures with two steel plate girders and a deck comprising of precast reinforced concrete panels. The concept of arching in deck slabs was utilized in the steel-free precast panels used in the Lindquist Bridge in British Columbia, Canada. The panels were completely devoid of tensile reinforcement and transverse confinement to the panels was provided by external steel straps. After the bridge was constructed in 1998, electrical strain gauges were installed on the girders and straps. Static and dynamic load tests were performed. The cracks on the top and bottom of the deck were mapped in 1999 and 2003. In 2006, a load test and crack mapping were performed on the bridge. The strain readings in the straps were compared with the data obtained 8 years prior. After analysis of the strain gauge readings, conclusions were drawn on the performance of the bridge. The cracks were formed to accommodate arching action and it was concluded that the bridge is still performing as it was designed.

  1. Evaluation of the service performance of bridge components.

    DOT National Transportation Integrated Search

    2004-08-01

    This study was initiated to provide review of common bridges to determine the performance of their components. Seven bridge types were selected that constituted 85 % of the Kentucky Transportation Cabinet (KYTC) bridge inventory. 319 bridges were ins...

  2. Bridge inspection / washing program : bridge drainage program

    DOT National Transportation Integrated Search

    2002-02-01

    The Rhode Island Department of Transportation, Operations Division is responsible for operation and maintenance of roads and bridges, and construction of highway and multi-modal projects to improve the transportation system of our state. One of the m...

  3. The Importance of Bridging

    ERIC Educational Resources Information Center

    Zamboni, Camilla

    2014-01-01

    In this article, I will discuss the importance of the fundamental aspect of "bridging" in the wider context of language teaching. I will use "bridging" particularly in terms of cultural differences and underline the pivotal role of specific techniques, in a language class as well as in a pedagogy class or seminar, to help…

  4. Proceedings from the 2001 NASA Occupational Health Conference: Risk Assessment and Management in 2001

    NASA Technical Reports Server (NTRS)

    Roberson, Sheri (Editor); Kelly, Bruce (Editor); Gettleman, Alan G. (Technical Monitor)

    2001-01-01

    This Conference convened approximately 86 registered participants of invited guest speakers, NASA presenters, and a broad spectrum of the Occupational Health disciplines representing NASA Headquarters and all NASA Field Centers. Two days' Professional Development Courses on Exposure Assessment Strategies and Statistics and on Advanced Cardiac Life Support training and recertification preceded the Conference. With the theme, 'Risk Assessment and Management in 2001,' conferees were first provided updates from the Program Principal Center Office and the Headquarters Office. Plenary sessions elaborated on several topics: biological terrorism, OSHA recordability, Workers' Compensation issues, Federal ergonomic standards, bridging aerospace medicine and occupational health-especially in management of risk in spaceflight, and EAP operations with mission failures. A keynote address dealt with resiliency skills for 21st century workers and two NASA astronaut speakers highlighted a tour of the Johnson Space Center. During discipline specific breakout sessions, current issues in occupational health management and policy, credentialing and privileging, health risk assessment, measurement and standardization, audits, database development, prevention and rehabilitation, international travel and infection control, employee assistance, nursing process, and environmental health were presented.

  5. Vehicle - Bridge interaction, comparison of two computing models

    NASA Astrophysics Data System (ADS)

    Melcer, Jozef; Kuchárová, Daniela

    2017-07-01

    The paper presents the calculation of the bridge response on the effect of moving vehicle moves along the bridge with various velocities. The multi-body plane computing model of vehicle is adopted. The bridge computing models are created in two variants. One computing model represents the bridge as the Bernoulli-Euler beam with continuously distributed mass and the second one represents the bridge as the lumped mass model with 1 degrees of freedom. The mid-span bridge dynamic deflections are calculated for both computing models. The results are mutually compared and quantitative evaluated.

  6. Phase and widening construction of steel bridges : [summary].

    DOT National Transportation Integrated Search

    2014-03-01

    Maintaining traffic flow for bridge widening and replacement projects often requires bridges to be constructed in phases so that traffic can travel on one : portion of the bridge while another portion is being : constructed. The bridge portions are t...

  7. Seismic response of precast segmental bridge superstructures.

    DOT National Transportation Integrated Search

    2006-12-01

    Precast segmental construction of bridges can accelerate construction and minimize the cost of bridges in highly congested urban environments and environmentally sensitive regions. Despite their proven benefits, the use of precast segmental bridges i...

  8. A novel type of peptidoglycan-binding domain highly specific for amidated D-Asp cross-bridge, identified in Lactobacillus casei bacteriophage endolysins.

    PubMed

    Regulski, Krzysztof; Courtin, Pascal; Kulakauskas, Saulius; Chapot-Chartier, Marie-Pierre

    2013-07-12

    Peptidoglycan hydrolases (PGHs) are responsible for bacterial cell lysis. Most PGHs have a modular structure comprising a catalytic domain and a cell wall-binding domain (CWBD). PGHs of bacteriophage origin, called endolysins, are involved in bacterial lysis at the end of the infection cycle. We have characterized two endolysins, Lc-Lys and Lc-Lys-2, identified in prophages present in the genome of Lactobacillus casei BL23. These two enzymes have different catalytic domains but similar putative C-terminal CWBDs. By analyzing purified peptidoglycan (PG) degradation products, we showed that Lc-Lys is an N-acetylmuramoyl-L-alanine amidase, whereas Lc-Lys-2 is a γ-D-glutamyl-L-lysyl endopeptidase. Remarkably, both lysins were able to lyse only Gram-positive bacterial strains that possess PG with D-Ala(4)→D-Asx-L-Lys(3) in their cross-bridge, such as Lactococcus casei, Lactococcus lactis, and Enterococcus faecium. By testing a panel of L. lactis cell wall mutants, we observed that Lc-Lys and Lc-Lys-2 were not able to lyse mutants with a modified PG cross-bridge, constituting D-Ala(4)→L-Ala-(L-Ala/L-Ser)-L-Lys(3); moreover, they do not lyse the L. lactis mutant containing only the nonamidated D-Asp cross-bridge, i.e. D-Ala(4)→D-Asp-L-Lys(3). In contrast, Lc-Lys could lyse the ampicillin-resistant E. faecium mutant with 3→3 L-Lys(3)-D-Asn-L-Lys(3) bridges replacing the wild-type 4→3 D-Ala(4)-D-Asn-L-Lys(3) bridges. We showed that the C-terminal CWBD of Lc-Lys binds PG containing mainly D-Asn but not PG with only the nonamidated D-Asp-containing cross-bridge, indicating that the CWBD confers to Lc-Lys its narrow specificity. In conclusion, the CWBD characterized in this study is a novel type of PG-binding domain targeting specifically the D-Asn interpeptide bridge of PG.

  9. Uncontrolled concrete bridge parapet cracking.

    DOT National Transportation Integrated Search

    2013-06-01

    The Ohio Department of Transportation has recently identified the problem of wide-spread premature cracking of concrete bridge : parapets throughout its District 12 region (Northeast Ohio). Many of the bridge decks that contain these prematurely crac...

  10. Virginia Bridge Information Systems Laboratory.

    DOT National Transportation Integrated Search

    2014-06-01

    This report presents the results of applied data mining of legacy bridge databases, focusing on the Pontis and : National Bridge Inventory databases maintained by the Virginia Department of Transportation (VDOT). Data : analysis was performed using a...

  11. Integrated 3D bridge-condition visualization (BCV) to facilitate element-based bridge condition rating (EBCR).

    DOT National Transportation Integrated Search

    2015-11-01

    Routine inspection and maintenance records are essential for bridges to function well throughout their intended lifespan. : Although existing bridge management systems are efficient at data storage, it is difficult to conduct comprehensive data : ana...

  12. Key Royale bridge five year evaluation : [summary].

    DOT National Transportation Integrated Search

    2013-06-01

    The Florida Department of Transportation (FDOT) : maintains more than 6,500 bridges. Considering : the expense of repair and replacement of bridges, : extending their durability and service life is : important. Of special concern for bridges in : mar...

  13. Precast alternative for flat slab bridges : final report.

    DOT National Transportation Integrated Search

    2013-10-26

    The cast-in-place (CIP) concrete slab bridge and the hollow core flat slab bridge are two very common bridge types utilized by the : South Carolina Department of Transportation (SCDOT). The CIP bridge is durable but has a long construction time while...

  14. Controlled impact demonstration airframe bending bridges

    NASA Technical Reports Server (NTRS)

    Soltis, S. J.

    1986-01-01

    The calibration of the KRASH and DYCAST models for transport aircraft is discussed. The FAA uses computer analysis techniques to predict the response of controlled impact demonstration (CID) during impact. The moment bridges can provide a direct correlation between the predictive loads or moments that the models will predict and what was experienced during the actual impact. Another goal is to examine structural failure mechanisms and correlate with analytical predictions. The bending bridges did achieve their goals and objectives. The data traces do provide some insight with respect to airframe loads and structural response. They demonstrate quite clearly what's happening to the airframe. A direct quantification of metal airframe loads was measured by the moment bridges. The measured moments can be correlated with the KRASH and DYCAST computer models. The bending bridge data support airframe failure mechanisms analysis and provide residual airframe strength estimation. It did not appear as if any of the bending bridges on the airframe exceeded limit loads. (The observed airframe fracture was due to the fuselage encounter with the tomahawk which tore out the keel beam.) The airframe bridges can be used to estimate the impact conditions and those estimates are correlating with some of the other data measurements. Structural response, frequency and structural damping are readily measured by the moment bridges.

  15. FHWA LTBP Bridge Performance Primer

    DOT National Transportation Integrated Search

    2014-02-01

    This TechBrief defines bridge performance and discusses the importance of measuring performance and current practices for doing so. It identifies key issues to improving performance measures and the role the Long-Term Bridge Performance (LTBP) Progra...

  16. Colorado statewide historic bridge inventory.

    DOT National Transportation Integrated Search

    2011-05-01

    The purpose of the Colorado statewide historic bridge inventory was to document and evaluate the National : Register of Historic Places eligibility all on-system highway bridges and grade separation structures built in : Colorado between 1959 and 196...

  17. Bridge Frost Prediction by Heat and Mass Transfer Methods

    NASA Astrophysics Data System (ADS)

    Greenfield, Tina M.; Takle, Eugene S.

    2006-03-01

    Frost on roadways and bridges can present hazardous conditions to motorists, particularly when it occurs in patches or on bridges when adjacent roadways are clear of frost. To minimize materials costs, vehicle corrosion, and negative environmental impacts, frost-suppression chemicals should be applied only when, where, and in the appropriate amounts needed to maintain roadways in a safe condition for motorists. Accurate forecasts of frost onset times, frost intensity, and frost disappearance (e.g., melting or sublimation) are needed to help roadway maintenance personnel decide when, where, and how much frost-suppression chemical to use. A finite-difference algorithm (BridgeT) has been developed that simulates vertical heat transfer in a bridge based on evolving meteorological conditions at its top and bottom as supplied by a weather forecast model. BridgeT simulates bridge temperatures at numerous points within the bridge (including its upper and lower surface) at each time step of the weather forecast model and calculates volume per unit area (i.e., depth) of deposited, melted, or sublimed frost. This model produces forecasts of bridge surface temperature, frost depth, and bridge condition (i.e., dry, wet, icy/snowy). Bridge frost predictions and bridge surface temperature are compared with observed and measured values to assess BridgeT's skill in forecasting bridge frost and associated conditions.

  18. Design of piles for integral abutment bridges.

    DOT National Transportation Integrated Search

    1984-08-01

    More and more, integral abutment bridges are being used in place : of the more traditional bridge designs with expansion releases. In : this study, states which use integral abutment bridges were surveyed : to determine their current practice in the ...

  19. GRS bridge piers and abutments.

    DOT National Transportation Integrated Search

    2001-01-01

    This report presents the following three recent projects on load testing of geosynthetic-reinforced soil (GRS) bridge abutments and piers: a full-scale bridge pier load test conducted by the Turner-Fairbank Highway Research Center, Federal Highway Ad...

  20. Hydraulic and geomorphic monitoring of experimental bridge scour mitigation at selected bridges in Utah, 2003-05

    USGS Publications Warehouse

    Kenney, Terry A.; McKinney, Tim S.

    2006-01-01

    Unique bridge scour mitigation designs using concrete A-Jacks were developed by the Utah Department of Transportation and installed at the Colorado River Bridge at State Road 191 and the Green River Bridge at State Road 19. The U.S. Geological Survey monitored stream reaches at these sites by collecting streambed-topography and water-velocity data from 2003 through 2005. These data were acquired annually from a moving boat with an acoustic Doppler current profiler and a differential global positioning system. Raw unordered data were processed and readied for interpolation into organized datasets with DopplerMacros, a set of computer programs. Processed streambed topography data were geostatistically interpolated by using Ordinary Kriging, and inverse distance weighting interpolation was used in the development of the two-dimensional velocity datasets. These organized datasets of topography and velocity were developed for each survey of the two bridge sites. A comparison of the riverbed topography data for each survey was done. An increase in bed elevation related to the installation of the A-Jacks scour countermeasures is evident at the Colorado River Bridge at State Road 191. The three topographic datasets acquired after the installation at the Green River Bridge at State Road 19 show few changes.

  1. Hydraulic analysis of the Schoharie Creek bridge

    USGS Publications Warehouse

    Froehlich, David C.; Trent, Roy E.

    1989-01-01

    Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was determined to be scour of bed material from under the foundations of piers supporting the bridge. To evaluate the hydraulic conditions that produced the scour, a two-dimensional finite element surface-water flow model was constructed. The model was used to obtain a detailed description of water-surface elevations and depth-averaged velocities within a reach that extends from about 4000 ft downstream of the bridge to about 6000 ft upstream of the bridge.

  2. Performance analysis of LAN bridges and routers

    NASA Technical Reports Server (NTRS)

    Hajare, Ankur R.

    1991-01-01

    Bridges and routers are used to interconnect Local Area Networks (LANs). The performance of these devices is important since they can become bottlenecks in large multi-segment networks. Performance metrics and test methodology for bridges and routers were not standardized. Performance data reported by vendors is not applicable to the actual scenarios encountered in an operational network. However, vendor-provided data can be used to calibrate models of bridges and routers that, along with other models, yield performance data for a network. Several tools are available for modeling bridges and routers - Network II.5 was used. The results of the analysis of some bridges and routers are presented.

  3. Estimating bridge stiffness using a forced-vibration technique for timber bridge health monitoring

    Treesearch

    James P. Wacker; Xiping Wang; Brian Brashaw; Robert J. Ross

    2006-01-01

    This paper describes an effort to refine a global dynamic testing technique for evaluating the overall stiffness of timber bridge superstructures. A forced vibration method was used to measure the frequency response of several simple-span, sawn timber beam (with plank deck) bridges located in St. Louis County, Minnesota. Static load deflections were also measured to...

  4. Field performance of timber bridges. 11, Spearfish Creek stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; K. Stanfill-McMillan

    The Spearfish Creek bridge was constructed in 1992 in Spearfish, South Dakota. It is a single-span, stress-laminated, box-beam superstructure. Performance of the bridge is being monitored for 5 years, beginning at installation. This report summarizes results for the first 3-1/2 years of monitoring and includes information on the design, construction, and field...

  5. Procedures for scour assessments at bridges in Pennsylvania

    USGS Publications Warehouse

    Cinotto, Peter J.; White, Kirk E.

    2000-01-01

    Scour is the process and result of flowing water eroding the bed and banks of a stream. Scour at nearly 14,300 bridges(1) spanning water, and the stability of river and stream channels in Pennsylvania, are being assessed by the U.S. Geological Survey (USGS) in cooperation with the Pennsylvania Department of Transportation (PennDOT). Procedures for bridge-scour assessments have been established to address the needs of PennDOT in meeting a 1988 Federal Highway Administration mandate requiring states to establish a program to assess all public bridges over water for their vulnerability to scour. The procedures also have been established to help develop an understanding of the local and regional factors that affect scour and channel stability. This report describes procedures for the assessment of scour at all bridges that are 20 feet or greater in length that span water in Pennsylvania. There are two basic types of assessment: field-viewed bridge site assessments, for which USGS personnel visit the bridge site, and office-reviewed bridge site assessments, for which USGS personnel compile PennDOT data and do not visit the bridge site. Both types of assessments are primarily focused at assisting PennDOT in meeting the requirements of the Federal Highway Administration mandate; however, both assessments include procedures for the collection and processing of ancillary data for subsequent analysis. Date of bridge construction and the accessibility of the bridge substructure units for inspection determine which type of assessment a bridge receives. A Scour-Critical Bridge Indicator Code and a Scour Assessment Rating are computed from selected collected and compiled data. PennDOT personnel assign the final Scour-Critical Bridge Indicator Code and a Scour Assessment Rating on the basis of their review of all data. (1)Words presented in bold type are defined in the Glossary section of this report.

  6. Rating and analysis of continuous girder bridges.

    DOT National Transportation Integrated Search

    1980-01-01

    Federal regulations prompted as a result of bridge failures require the rating of bridge structures for which federal funds will be utilized for rehabilitation and replacement. The large number of bridges in Virginia subject to being rated makes such...

  7. Design aids of NU I-girders bridges.

    DOT National Transportation Integrated Search

    2010-05-01

    Precast prestressed concrete I-Girder bridges have become the most dominant bridge system in the United States. In the early design : stages, preliminary design becomes a vital first step in designing an economical bridge. Within the state of Nebrask...

  8. Faster bridge construction using precast substructures : brief.

    DOT National Transportation Integrated Search

    2011-07-01

    Bridge replacement often requires road closures and detours that frustrate road users. It remains a key goal of Wisconsin DOT to reduce construction-related road use interruptions. This will be a challenge with bridges: Bridge inspections in 2007 ide...

  9. Hillsboro Canal bridge monitoring : [summary].

    DOT National Transportation Integrated Search

    2011-01-01

    Floridas inventory of 148 moveable bridges is : the largest in the nation. Most employ open grid : steel decks, which have important advantages : over solid bridge decks: they can be assembled in : the factory, are lightweight and easy to install;...

  10. BUILDING "BRIDGES" WITH QUALITY ASSURANCE

    EPA Science Inventory

    The papr describes how, rather than building "bridges" across centuries, quality assurance (QA) personnel have the opportunity to build bridges across technical disciplines, between public and private organizations, and between different QA groups. As reviewers and auditors of a...

  11. Monitoring bridge scour using fiber optic sensors.

    DOT National Transportation Integrated Search

    2015-04-01

    The scouring process excavates and carries away materials from the bed and banks of streams, and from : around the piers and abutments of bridges. Scour undermines bridges and may cause bridge failures due to : structural instability. In the last 30 ...

  12. Covered Bridge Security Manual

    Treesearch

    Brett Phares; Terry Wipf; Ryan Sievers; Travis Hosteng

    2013-01-01

    The design, construction, and use of covered timber bridges is all but a lost art in these days of pre-stressed concrete, high-performance steel, and the significant growth both in the volume and size of vehicles. Furthermore, many of the existing covered timber bridges are preserved only because of their status on the National Registry of Historic Places or the...

  13. Public response to bridge colors.

    DOT National Transportation Integrated Search

    1973-01-01

    To determine people's reactions to bridges painted in colors as white, yellow, green, blue, red, brown, black, and aluminum, two test bridges were selected in Charlottesville, Virginia. One was painted a different color each month and the other was k...

  14. Evaluation of bridge deck sealers.

    DOT National Transportation Integrated Search

    2014-06-01

    This study focuses on the evaluation of bridge deck sealers commonly used on highway bridge decks and : their relative performance. After reviewing the most up-to-date research findings on chemical sealers used : by state DOTs, four sealer products t...

  15. Evaluation of the Buena Vista IBRD bridge : a furthering of accelerated bridge construction in Iowa.

    DOT National Transportation Integrated Search

    2012-02-01

    The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the...

  16. Geotextile reinforced bridge approach embankment : Lake River Bridge - Malin Highway , Klamath County, Oregon : final report.

    DOT National Transportation Integrated Search

    1997-08-01

    An experimental construction method was evaluated at the Lost River Bridge in Klamath County to reduce the discontinuity between the bridge and the roadway. The method included combining soil in six 300-mm lifts interlaced with geotextile reinforceme...

  17. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this part...

  18. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program to...

  19. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program to...

  20. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this part...

  1. Salt bridge as a gatekeeper against partial unfolding.

    PubMed

    Hinzman, Mark W; Essex, Morgan E; Park, Chiwook

    2016-05-01

    Salt bridges are frequently observed in protein structures. Because the energetic contribution of salt bridges is strongly dependent on the environmental context, salt bridges are believed to contribute to the structural specificity rather than the stability. To test the role of salt bridges in enhancing structural specificity, we investigated the contribution of a salt bridge to the energetics of native-state partial unfolding in a cysteine-free version of Escherichia coli ribonuclease H (RNase H*). Thermolysin cleaves a protruding loop of RNase H(*) through transient partial unfolding under native conditions. Lys86 and Asp108 in RNase H(*) form a partially buried salt bridge that tethers the protruding loop. Investigation of the global stability of K86Q/D108N RNase H(*) showed that the salt bridge does not significantly contribute to the global stability. However, K86Q/D108N RNase H(*) is greatly more susceptible to proteolysis by thermolysin than wild-type RNase H(*) is. The free energy for partial unfolding determined by native-state proteolysis indicates that the salt bridge significantly increases the energy for partial unfolding by destabilizing the partially unfolded form. Double mutant cycles with single and double mutations of the salt bridge suggest that the partially unfolded form is destabilized due to a significant decrease in the interaction energy between Lys86 and Asp108 upon partial unfolding. This study demonstrates that, even in the case that a salt bridge does not contribute to the global stability, the salt bridge may function as a gatekeeper against partial unfolding that disturbs the optimal geometry of the salt bridge. © 2016 The Protein Society.

  2. Bridge Scour Measurements Using the Rfid Technology

    NASA Astrophysics Data System (ADS)

    Moustakidis, I.; Tsakiris, A. G.; Papanicolaou, T.

    2010-12-01

    The main purpose of this project is to develop a system for continuous monitoring scour around bridge piers and abutments (i.e. bridge scour) using the Radio Frequency IDentification (RFID) technology and examine its applicability for estimating scour around a pier or an existing bridge. Excessive bridge scour can compromise the bridge foundations and lead to dramatic bridge collapses with significant impacts on economy and traveling public safety. An RFID system consists of three main components: the low frequency reader (~134.2 kHz frequency), the transponder (derived from transmitter/responder) and the antenna (of rectangular shape with one or more loops). RFID is a technology that permits the wireless two-way transfer of information from a reader to a transponder via RF waves transmitted with an antenna. What makes RFIDs suitable for monitoring bridge scour is that no line of sight is necessary between the reader and the transponder, which can be detected even when it is buried in the bed substrate. The proposed system for monitoring bridge scour relies on the principle that transponders oriented perpendicular to antenna plane can be detected at longer distances, than transponders oriented parallel to it. We intend to attach transponders at predetermined locations (depths) along a chain with known length. The chain will subsequently be driven into the bed substrate at the location where bridge scour hole is expected within the detection range of the antenna, which will be installed directly above the chain. The chain will retain the transponders perpendicular to the antenna plane, so that they can be continuously detected. Once scour takes place, the transponders will be oriented parallel to the antenna plane and thus they will not be detected. The latter will indicate that bridge scour reached the known depth, at which the transponder was initially buried. Once a prototype RFID system is functional, future research will aim at combining it with satellite

  3. IceBridge: Bringing a Field Campaign Home

    NASA Astrophysics Data System (ADS)

    Woods, J.; Beck, J.; Bartholow, S.

    2015-12-01

    IceBridge, a six-year NASA mission, is the largest airborne survey of Earth's polar ice ever flown. It will yield an unprecedented three-dimensional view of Arctic and Antarctic ice sheets, ice shelves and sea ice. These flights will provide a yearly, multi-instrument look at the behavior of the rapidly changing features of the Greenland and Antarctic ice. Data collected during IceBridge will help scientists bridge the gap in polar observations between NASA's Ice, Cloud and Land Elevation Satellite (ICESat) -- in orbit since 2003 -- and ICESat-2, planned for 2017. ICESat stopped collecting science data in 2009, making IceBridge critical for ensuring a continuous series of observations. IceBridge will use airborne instruments to map Arctic and Antarctic areas once a year at a minimum, with new campaigns being developed during the Arctic melt season. IceBridge flights are conducted in the spring and summer for the Arctic and in the fall over Antarctica. Other smaller airborne surveys around the world are also part of the IceBridge campaign. IceBridge actively engages the public and educators through a variety of outlets ranging from communications strategies through social media outlets, to larger organized efforts such as PolarTREC. In field activities include blog posts, photo updates, in flight chat sessions, and more intensive live events to include google hangouts, where field team members can interact with the public during a scheduled broadcast. The IceBridge team provides scientists and other team members with the training and support to become communicators in their own right. There is an exciting new initiative where IceBridge will be collaborating with Undergraduate and Graduate students to integrate the next generation of scientists and communicators into the Science Teams. This will be explored through partnerships with institutions that are interested in mentoring through project based initiatives.

  4. Rapid replacement/construction of bridges.

    DOT National Transportation Integrated Search

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  5. Advanced bridge safety initiative : live load testing and load rating of the Evans Brook Bridge (#5506) and the Hastings Bridge (#5507) in Batchelders Grant, Maine.

    DOT National Transportation Integrated Search

    2014-01-01

    The Advanced Structures and Composites Center at the University of Maine (UMaine) performed live load testing : and rating factor analysis for two bridges (No. 5506 and No. 5507) in Batchelders Grant, Maine. The bridge load : rating performed by cons...

  6. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  7. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  8. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  9. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  10. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  11. 49 CFR 236.387 - Movable bridge locking.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Movable bridge locking. 236.387 Section 236.387 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... and Tests § 236.387 Movable bridge locking. Movable bridge locking shall be tested at least once a...

  12. 49 CFR 236.387 - Movable bridge locking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge locking. 236.387 Section 236.387 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... and Tests § 236.387 Movable bridge locking. Movable bridge locking shall be tested at least once a...

  13. Phase II : correlation between experimental and finite element analysis : Alaska bridge 255-Chulitna River bridge.

    DOT National Transportation Integrated Search

    2014-09-01

    In this study, we will monitor the behavior of the Alaska Chulitna Bridge for the specific purpose of assisting the DOT in performing an accurate : condition assessment of this bridge. : Based on the state-of-the-art SHM knowledge and technologies wi...

  14. 33 CFR 118.85 - Lights on vertical lift bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on vertical lift bridges... BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.85 Lights on vertical lift bridges. (a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the...

  15. 33 CFR 118.85 - Lights on vertical lift bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on vertical lift bridges... BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.85 Lights on vertical lift bridges. (a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the...

  16. Conference Model: Guidelines...for Science Supervisors on How to Conduct a Successful Leadership Conference.

    ERIC Educational Resources Information Center

    DeBlasi, Robert V.

    Guidelines of a four-phase model for conducting leadership conferences are outlined. Phase I focuses on initial conference planning, including (1) identifying need and purpose for the conference; (2) selecting a conference chairperson; (3) forming the conference planning committee, listing suggested committees and their responsibilities (program,…

  17. Maximal liquid bridges between horizontal cylinders

    NASA Astrophysics Data System (ADS)

    Cooray, Himantha; Huppert, Herbert E.; Neufeld, Jerome A.

    2016-08-01

    We investigate two-dimensional liquid bridges trapped between pairs of identical horizontal cylinders. The cylinders support forces owing to surface tension and hydrostatic pressure that balance the weight of the liquid. The shape of the liquid bridge is determined by analytically solving the nonlinear Laplace-Young equation. Parameters that maximize the trapping capacity (defined as the cross-sectional area of the liquid bridge) are then determined. The results show that these parameters can be approximated with simple relationships when the radius of the cylinders is small compared with the capillary length. For such small cylinders, liquid bridges with the largest cross-sectional area occur when the centre-to-centre distance between the cylinders is approximately twice the capillary length. The maximum trapping capacity for a pair of cylinders at a given separation is linearly related to the separation when it is small compared with the capillary length. The meniscus slope angle of the largest liquid bridge produced in this regime is also a linear function of the separation. We additionally derive approximate solutions for the profile of a liquid bridge, using the linearized Laplace-Young equation. These solutions analytically verify the above-mentioned relationships obtained for the maximization of the trapping capacity.

  18. Conference Support, 23rd Western Photosynthesis Conference 2014, Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wachter, Rebekka

    The Western Photosynthesis Conference is a regional conference that is held on an annual basis to bring together researchers primarily from the Western United States to share their newest research advances on photosynthetic processes. The 23rd conference was focused on both fundamental and more applied research on the biological conversion of solar energy to various energy storage forms. Several particular areas of solar energy conversion were emphasized in this conference (see below). Some of these topics, such as carbon limitations on photosynthesis, biomimicry and phenotyping, have traditionally not been incorporated extensively in the Western Photosynthesis Conference. We found that thesemore » topics have substantially broadened of the scope of this meeting.« less

  19. Modeling walker synchronization on the Millennium Bridge.

    PubMed

    Eckhardt, Bruno; Ott, Edward; Strogatz, Steven H; Abrams, Daniel M; McRobie, Allan

    2007-02-01

    On its opening day the London Millennium footbridge experienced unexpected large amplitude wobbling subsequent to the migration of pedestrians onto the bridge. Modeling the stepping of the pedestrians on the bridge as phase oscillators, we obtain a model for the combined dynamics of people and the bridge that is analytically tractable. It provides predictions for the phase dynamics of individual walkers and for the critical number of people for the onset of oscillations. Numerical simulations and analytical estimates reproduce the linear relation between pedestrian force and bridge velocity as observed in experiments. They allow prediction of the amplitude of bridge motion, the rate of relaxation to the synchronized state and the magnitude of the fluctuations due to a finite number of people.

  20. Mitochondria in health and disease - 3rd annual conference of society for mitochondrial research and medicine - 19-20 December 2013 - Bengaluru, India.

    PubMed

    Durhuus, Jon Ambæk; Desler, Claus; Rasmussen, Lene Juel

    2015-01-01

    The primary role of mitochondria was long considered to be production of cellular energy. However, as the understanding of mitochondria in disease is ever expanding, so is their additional function for a healthy organism. Mitochondrial dysfunction is linked to a range of pathologies, including cancer, neurodegenerative disorders, premature aging, diabetes and muscular diseases. Mitochondrial diseases can be hard to diagnose and treat and, therefore, interdisciplinary research and communication are important. The Third Annual Conference of Society for Mitochondrial Research and Medicine - India (SMRM) was titled "Mitochondria in Health and Disease". The conference was organized by Gayathri N, K Thangaraj, and KK Singh and was held at the National Institute of Mental Health & Neuro Sciences (NIMHANS) in Bangalore, India, from the 19th to 20th of December 2013. The meeting featured internationally renowned speakers within the field of mitochondrial research and medicine with the goal of bridging the gap between basic and clinical researchers. This review summarizes key outcomes of the conference. Copyright © 2014 © Elsevier B.V. and Mitochondria Research Society. Published by Elsevier B.V. All rights reserved.

  1. Structural characterization of UHPC waffle bridge deck and connections.

    DOT National Transportation Integrated Search

    2014-07-01

    The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge : construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing sa...

  2. Bridging the gap?

    PubMed

    del Rio, C; Soto-Ramirez, L E

    1998-09-01

    At the 12th World AIDS Conference in Geneva many sessions discussed the reality that although AIDS treatment has made major advances, it remains financially out of reach for most of the world's population. Since the Vancouver conference, an additional 10 million people have become infected with HIV. A chart shows the prevalence of AIDS by continent. While many believe a reliable and affordable vaccine is the answer, none of the vaccines under development appear very effective. Other sessions at the conference discussed preventing perinatal transmission, the status of highly active antiretroviral therapy research, viral resistance, and results of studies on tuberculosis, STDs, and other opportunistic infections.

  3. Stability Limits and Dynamics of Nonaxisymmetric Liquid Bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Slobozhanin, Lev A.; Resnick, Andrew H.; Ramus, Jean-Francois; Delafontaine, Sylvie

    1999-01-01

    Liquid bridges have been the focus of numerous theoretical and experimental investigations since the early work by Plateau more than a century ago. More recently, motivated by interest in their physical behavior and their occurrence in a variety of technological situations, there has been a resurgence of interest in the static and dynamic behavior of liquid bridges. Furthermore, opportunities to carry out experiments in the near weightless environment of a low-Earth-orbit spacecraft have also led to a number of low-gravity experiments involving large liquid bridges. In this paper, we present selected results from our work concerning the stability of nonaxisymmetric liquid bridges, the bifurcation of weightless bridges in the neighborhood of the maximum volume stability limit, isorotating axisymmetric bridges contained between equidimensional disks, and bridges contained between unequal disks. For the latter, we discuss both theoretical and experimental results. Finally, we present results concerning the stability of axisymmetric equilibrium configurations for a capillary liquid partly contained in a closed circular cylinder.

  4. Guardrails for use on historic bridges : volume 1--replacement strategies.

    DOT National Transportation Integrated Search

    2016-11-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...

  5. Dynamic Interaction of Long Suspension Bridges with Running Trains

    NASA Astrophysics Data System (ADS)

    XIA, H.; XU, Y. L.; CHAN, T. H. T.

    2000-10-01

    This paper presents an investigation of dynamic interaction of long suspension bridges with running trains. A three-dimensional finite element model is used to represent a long suspension bridge. Each 4-axle vehicle in a train is modelled by a 27-degrees-of-freedom dynamic system. The dynamic interaction between the bridge and train is realized through the contact forces between the wheels and track. By applying a mode superposition technique to the bridge only and taking the measured track irregularities as known quantities, the number of degrees of freedom (d.o.f.) the bridge-train system is significantly reduced and the coupled equations of motion are efficiently solved. The proposed formulation and the associated computer program are then applied to a real long suspension bridge carrying a railway within the bridge deck. The dynamic response of the bridge-train system and the derail and offload factors related to the running safety of the train are computed. The results show that the formulation presented in this paper can well predict dynamic behaviors of both bridge and train with reasonable computation efforts. Dynamic interaction between the long suspension bridge and train is not significant.

  6. Highway bridge inspection : state-of-the-practice survey

    DOT National Transportation Integrated Search

    2001-04-01

    The congressionally mandated National Bridge Inspection program requires States to periodically inventory, inspect, and rate all highway bridges on public roads. The National Bridge Inspection Standards, implemented in 1971, prescribe minimum require...

  7. Polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs) and Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. : Several problems were encountered duri...

  8. National Conference[s] on Career Education: Final Report.

    ERIC Educational Resources Information Center

    Clark, Joseph F.; And Others

    The report describes a series of conferences whose objective was to orient selected educational leaders to the implications of preparing educational personnel with a career education perspective. The first 32 pages of the report discuss project objectives and procedures, and detail participant profiles, pre- and post-conference career education…

  9. Wind tunnel test of musi VI bridge

    NASA Astrophysics Data System (ADS)

    Permata, Robby; Andika, Matza Gusto; Syariefatunnisa, Risdhiawan, Eri; Hermawan, Budi; Noordiana, Indra

    2017-11-01

    Musi VI Bridge is planned to cross the Musi River in Palembang City, South Sumatera Province, Indonesia. The main span is a steel arch type with 200 m length and side span length is 75 m. Finite element analysis results showed that the bridge has frequency ratio for torsional and heaving mode (torsional frequency/heaving frequency)=1.14. This close to unity value rises concern about aerodynamic behaviour and stability of the bridge deck under wind loading. Sectional static and free vibration wind tunnel test were performed to clarify this phenomena in B2TA3 facility in Serpong, Indonesia. The test followed the draft of Guide of Wind Tunnel Test for Bridges developed by Indonesian Ministry of Public Works. Results from wind tunnel testing show that the bridge is safe from flutter instability and no coupled motion vibration observed. Therefore, low value of frequency ratio has no effect to aerodynamic behaviour of the bridge deck. Vortex-induced vibration in heaving mode occurred in relatively low wind velocity with permissible maximum amplitude value.

  10. A Bridge to Active Learning: A Summer Bridge Program Helps Students Maximize Their Active-Learning Experiences and the Active-Learning Experiences of Others

    PubMed Central

    Cooper, Katelyn M.; Ashley, Michael; Brownell, Sara E.

    2017-01-01

    National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly identified that Bridge students had developed sophisticated views of active learning, even though this was not an explicit goal of the program. We conducted an additional set of semistructured interviews that focused on active learning and compared the interviews of Bridge students with those from non-Bridge students who had been eligible for but did not participate in the program. We used the constant comparative method to identify themes from the interviews. We found that Bridge students perceived that, because they knew how to approach active learning and viewed it as important, they benefited more from active learning in introductory biology than non-Bridge students. Specifically, Bridge students seemed to be more aware of their own learning gains from participating in active learning. Compared with the majority of non-Bridge students, the majority of Bridge students described using a greater variety of strategies to maximize their experiences in active learning. Finally, in contrast to non-Bridge students, Bridge students indicated that they take an equitable approach to group work. These findings suggest that we may be able to prime students to maximize their own and other’s experiences in active learning. PMID:28232588

  11. Toll bridge report to the California legislature, FY 2001 - 02

    DOT National Transportation Integrated Search

    2002-01-01

    In the San Francisco Bay Area, eight toll bridges serve as essential transportation arteries for the traveling public. Seven of the bridges are state-owned: the Antioch Bridge, the Benicia-Martinez Bridge, the Carquinez Bridge, the Richmond-San Rafae...

  12. CONFERENCE NOTE: Conference on Precision Electromagnetic Measurements

    NASA Astrophysics Data System (ADS)

    1991-01-01

    The next Conference on Precision Electromagnetic Measurements (CPEM), will be held from 9 to 12 June 1992 at the Centre des Nouvelles Industries et Technologies (CNIT), La Défense, Paris, France. This conference, which is held every two years and whose importance and high level, confirmed by thirty years' experience, are recognized throughout the world, can be considered as a forum in which scientists, metrologists and professionals will have the opportunity to present and compare their research results on fundamental constants, standards and new techniques of precision measurement in the electromagnetic domain. Topics The following topics are regarded as the most appropriate for this conference: realization of units and fundamental constants d.c. a.c. and high voltage time and frequency radio-frequency and microwaves dielectrics, antennas, fields lasers, fibre optics advanced instrumentation, cryoelectronics. There will also be a session on international cooperation. Conference Language The conference language will be English. No translation will be provided. Organizers Société des Electriciens et des Electroniciens (SEE). Bureau National de Métrologie (BNM) Sponsors Institute of Electrical and Electronics Engineers (IEEE) Instrumentation & Measurement Society Union Radio Scientifique Internationale United States National Institute of Standards and Technology Centre National d'Etudes des Télécommunications Mouvement Français pour la Qualité, Section Métrologie Comité National Français de Radioélectricité Scientifique Contact Jean Zara, CPEM 92 publicity, Bureau National de Métrologie, 22, rue Monge, 75005 Paris Tel.: (33) 1 46 34 48 16, Fax: (33) 1 46 34 48 63

  13. Concrete bridge deck condition assessment and improvement strategies.

    DOT National Transportation Integrated Search

    2004-11-01

    The aging and deterioration of bridges in Utah mandates increasingly cost-effective strategies for bridge maintenance, rehabilitation, and repair (MR&R). Although the substructures and superstructures of bridges in Utah are in relatively good structu...

  14. 0-6722 : spread prestressed concrete slab beam bridges.

    DOT National Transportation Integrated Search

    2014-08-01

    The Texas Department of Transportation uses : precast prestressed concrete slab beam bridges for : shorter-span bridges of approximately 3050 ft in : length. Conventional slab beam bridges have slab : beams placed immediately adjacent to one anoth...

  15. Final report bridge design system analysis and modernization.

    DOT National Transportation Integrated Search

    2016-09-27

    The Bridge Design System (BDS) is an in-house software program developed by the Michigan Department of Transportations : (MDOT) Bridge Design Unit. The BDS designs bridges according to the required specifications, and outputs corresponding design ...

  16. Building Bridges One Line at a Time

    ERIC Educational Resources Information Center

    Grigsby, Cathy Murray

    2012-01-01

    In this article, first-grade students were taught the different kinds of lines that were part of the construction of various bridges--the curved lines of the arches of stone bridges, straight lines connecting the cables of a suspension bridge, vertical lines, horizontal lines, and so on. They gained practice in drawing structures and in fine brush…

  17. Characterization of railroad bridge service interruptions.

    DOT National Transportation Integrated Search

    2013-02-01

    The Federal Railroad Administration contracted Transportation Technology Center, Inc., to study bridge problems that cause accidents or service interruptions and to use this information to evaluate the need to develop bridge monitoring systems. Exist...

  18. Assessment of Bridging Requirements and Current Bridging Capabilities for use of Legacy Heavy Forces Inside the Contemporary Operational Environment

    DTIC Science & Technology

    2003-01-01

    vehicle-launched bridge (AVLB), the medium-girder bridge (MGB) and the Ribbon Bridge. The AVLB is capable of crossing 17-meter gaps using a crew under ... armor protection (FM 5-34, 2001). The MGB is capable of crossing single spans of 46.2 meters with the addition of a “link-reinforcement system” that

  19. Impact of Gender and Conference Size on Conference Preferences--Employing Natural Language Processing

    ERIC Educational Resources Information Center

    Eckhaus, Eyal; Davidovitch, Nitza

    2018-01-01

    This pilot study focuses on the impact of academic conferences from a gender-based perspective. What motivates faculty members to attend conferences? Which conferences do they choose? Can differences be found between men and women in their attitude to the effect of the conference and its contribution to their academic work, in light of many…

  20. Why the water bridge does not collapse

    NASA Astrophysics Data System (ADS)

    Aerov, Artem A.

    2011-09-01

    In 2007 an interesting phenomenon was discovered [J. Phys. DJPAPBE0022-372710.1088/0022-3727/40/19/052 40, 6112 (2007)]: a horizontal thread of water, the so-called water bridge, hangs in a horizontal electrostatic field. A different explanation of the water bridge stability is proposed herein: the force supporting it is the surface tension of water, while the role of the electric field is to not allow the water bridge to reduce its surface energy by breaking into separate drops. It is proven that electrostatic field is not the origin of the tension holding the bridge.

  1. 23 CFR 650.705 - Application for discretionary bridge funds.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Application for discretionary bridge funds. 650.705... TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.705 Application for discretionary bridge funds. Each year through its field offices, the FHWA will...

  2. 23 CFR 650.705 - Application for discretionary bridge funds.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for discretionary bridge funds. 650.705... TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.705 Application for discretionary bridge funds. Each year through its field offices, the FHWA will...

  3. New conceptual design of portable bamboo bridge for emergency purposes

    NASA Astrophysics Data System (ADS)

    Musthaffa, A. A.; Nor, N. M.; Yusof, M. A.; Yuhazri, M. Y.

    2018-02-01

    Portable bridges serve as routes for troops during the military operations and the disaster relief operation. Nowadays, bamboo has been regarded as one of the alternative construction materials for building and bridge structures. This paper presents the conceptual design of the portable bridge. Several types of portable bridges and bamboo bridges are reviewed in the current work. The characteristics, capability and method of construction of each bridge are discussed. Finally, the conceptual of the portable bamboo bridge for emergency purposes is presented. The idea of producing portable bridge is proposed in the current work as it is crucial for providing route for communities affected by natural disasters.

  4. A cloud-based information repository for bridge monitoring applications

    NASA Astrophysics Data System (ADS)

    Jeong, Seongwoon; Zhang, Yilan; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.

    2016-04-01

    This paper describes an information repository to support bridge monitoring applications on a cloud computing platform. Bridge monitoring, with instrumentation of sensors in particular, collects significant amount of data. In addition to sensor data, a wide variety of information such as bridge geometry, analysis model and sensor description need to be stored. Data management plays an important role to facilitate data utilization and data sharing. While bridge information modeling (BrIM) technologies and standards have been proposed and they provide a means to enable integration and facilitate interoperability, current BrIM standards support mostly the information about bridge geometry. In this study, we extend the BrIM schema to include analysis models and sensor information. Specifically, using the OpenBrIM standards as the base, we draw on CSI Bridge, a commercial software widely used for bridge analysis and design, and SensorML, a standard schema for sensor definition, to define the data entities necessary for bridge monitoring applications. NoSQL database systems are employed for data repository. Cloud service infrastructure is deployed to enhance scalability, flexibility and accessibility of the data management system. The data model and systems are tested using the bridge model and the sensor data collected at the Telegraph Road Bridge, Monroe, Michigan.

  5. Diagnostic evaluation and repair of deteriorated concrete bridges.

    DOT National Transportation Integrated Search

    2004-12-01

    Concrete bridge deck degradation has been observed in several bridges located in north Mississippi. In this study a : survey was conducted to collect and document instances of deterioration in concrete bridges located throughout the State. The : main...

  6. Crisis or Conference! Master List for Conference Planners.

    ERIC Educational Resources Information Center

    Carey, Tony

    This conference organizer's guide contains 42 lists of ideas, reminders, things to check, and questions to ask when a person is planning an event such as a conference, workshop, or training session. Written from a British point of view, the guide is organized into four parts in chronological order: preplanning, planning, onsite, and…

  7. Compilation of accelerated bridge construction (ABC) bridges : final report.

    DOT National Transportation Integrated Search

    2016-01-01

    Development of accelerated bridge construction (ABC) technologies has been occurring across the country, many times in : isolation. Although FHWA and others have worked to facilitate communication between these efforts, there was not a : comprehensiv...

  8. Verification of Texas superheavy load criteria for bridges.

    DOT National Transportation Integrated Search

    2011-11-01

    This report evaluates TxDOT criteria for the superheavy loads that trigger bridge analyses to determine : whether the criteria adequately protects Texas bridges. Researchers used solid modeling calibrated with a : bridge test of a 3-span continuous s...

  9. Diagnostic evaluation and repair of deteriorated concrete bridges

    DOT National Transportation Integrated Search

    2004-12-01

    Concrete bridge deck degradation has been observed in several bridges located in north Mississippi. In this study a survey was conducted to collect and document instances of deterioration in concrete bridges located throughout the State. The main cau...

  10. Developing a Tele-Robotic Platform for Bridge Inspection

    DOT National Transportation Integrated Search

    2011-05-01

    There are many bridges in Virginia with high traffic volumes or difficult access conditions which make these bridges difficult and expensive to inspect. In addition, the inspection of many bridges exposes the inspectors to hazardous conditions such a...

  11. Geosynthetic reinforced soil for low-volume bridge abutments.

    DOT National Transportation Integrated Search

    2012-01-01

    This report presents a review of literature on geosynthetic reinforced soil (GRS) bridge abutments, and test results and analysis from two : field demonstration projects (Bridge 1 and Bridge 2) conducted in Buchanan County, Iowa, to evaluate the feas...

  12. PREFACE: Nanosafe 2008: International Conference on Safe production and use of nanomaterials

    NASA Astrophysics Data System (ADS)

    Sentein, Carole; Schuster, Frédéric; Tardif, Francois

    2009-07-01

    organizers to perpetuate this event on a two year basis in order to become a global manifestation with greater success in bridging the gap between the best scientists, engineers, exhibitors and participants from countries concerned with safe and responsible nanomaterial activities. Therefore, the second International NanoSafe Conference 'NanoSafe2010' will be held in Grenoble at Minatec, 15-19 November 2010. The meeting was financially supported by generous contributions from the European Commission, La Région Rhône Alpes, la Ville de Grenoble, la Metro, and partners such as CEA, INERIS, Cilas, Niro A/S, Nanosight, Arkema, Faure Ingénierie, Philips, Sperian, TSI, Ecomesure, Mecachrome, Nanogate, INRS and Cordouan Technologies. Carole Sentein Frédéric Schuster Francois Tardif The conference Organizers

  13. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Who reviews bridge inspection reports? 170.507 Section... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge Inspection § 170.507 Who reviews bridge inspection reports? The person responsible for the bridge inspection...

  14. Crashworthy railing for timber bridges

    Treesearch

    Michael A. Ritter; Ronald K. Faller; Sheila Rimal Duwadi

    1999-01-01

    Bridge railing systems in the United States have historically beers designed based on static load criteria given in the American Association of State Highway and Transportation 0fficials (AASHTO) Standard Specifications for Highway Bridges. In the past decade, full-scale vehicle crash testing has been recognized as a more appropriate and reliable method of evaluating...

  15. A Hierarchical Analysis of Bridge Decision Makers ... The Role of New Technology Adoption in the Timber Bridge Market: Special Project

    Treesearch

    Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt

    1995-01-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the United States. The Analytical Hierarchy Process was used to characterize the bridge material selection decision of these individuals. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in...

  16. Characterization of bridge foundations workshop report.

    DOT National Transportation Integrated Search

    2013-11-01

    "In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge foundations. To narrow the focus and develop a research roadmap for the program, a workshop on Characterization of Bridge Foundations...

  17. Environmental impacts of bridge cleaning operations.

    DOT National Transportation Integrated Search

    2003-02-01

    Cleaning (washing) operations of existing leaded paints on bridges were studied to determine the level of lead contamination in the resulting wastewater. Twelve experimental overcoating projects were let on bridges with various types of existing pain...

  18. Characterization of bridge foundations workshop report.

    DOT National Transportation Integrated Search

    2013-11-01

    In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge : foundations. To narrow the focus and develop a research roadmap for the program, a workshop on : Characterization of Bridge Foundation...

  19. Stability limits and dynamics of nonaxisymmetric liquid bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnik, Andy; Kaukler, William F.

    1993-01-01

    This program of theoretical and experimental ground-based and low gravity research is focussed on the understanding of the dynamics and stability limits of nonaxisymmetric liquid bridges. There are three basic objectives to the proposed work: (1) to determine the stability limits of nonaxisymmetric liquid bridges held between non-coaxially aligned disks; (2) to examine the dynamics of nonaxisymmetric bridges and nonaxisymmetric oscillations of initially axisymmetric bridges (some of these experiments require a low gravity environment and the ground-based research will culminate in a definitive flight experiment); and (3) to experimentally investigate the vibration sensitivity of liquid bridges under terrestrial and low gravity conditions.

  20. IceBridge team members

    NASA Image and Video Library

    2013-11-13

    These IceBridge team members aboard a huge U.S. Air Force C-17 transport aircraft are ready to step out into the cold Antarctic air. The C-17 aircraft that fly to Antarctica are operated by the U.S. Air Force's 62nd and 446th Airlift Wings based at Joint Base Lewis-McChord near Seattle, Wash. Credit: NASA/Goddard/Michael Studinger NASA's Operation IceBridge is an airborne science mission to study Earth's polar ice. For more information about IceBridge, visit: www.nasa.gov/icebridge NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  1. Developing a bridge scour warning system : technical summary.

    DOT National Transportation Integrated Search

    2016-09-01

    Flooding and scour can be major threats to the integrity of bridges. During flood events, : scour at bridge piers and abutments can undermine the foundations of the bridge, causing : significant damage or even total structure loss. Because scour occu...

  2. Methods of modifying historic bridges for contemporary use.

    DOT National Transportation Integrated Search

    1980-01-01

    Studied by a team of experts in the fields of history, bridge engineering, architecture, and computer analysis were 21 old truss bridges of historical importance located in Virginia. These old bridges are narrow and have low load-carrying capacities,...

  3. Developing a bridge scour warning system : final report.

    DOT National Transportation Integrated Search

    2016-09-01

    Flooding and scour can be major threats to the integrity of bridges. During flood events, scour at bridge piers : and abutments can undermine the foundations of the bridge, causing significant damage or even total structure loss. : Because scour occu...

  4. 49 CFR 237.71 - Determination of bridge load capacities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Determination of bridge load capacities. 237.71... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Capacity of Bridges § 237.71 Determination of bridge load capacities. (a) Each track owner shall determine the load capacity of each of its...

  5. 49 CFR 237.71 - Determination of bridge load capacities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Determination of bridge load capacities. 237.71... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Capacity of Bridges § 237.71 Determination of bridge load capacities. (a) Each track owner shall determine the load capacity of each of its...

  6. Scour damage to Vermont bridges and scour monitoring.

    DOT National Transportation Integrated Search

    2015-06-01

    Scour is by far the primary cause of bridge failures in the United States. Regionally, the : vulnerability of bridges to flood damage became evident from the damage seen to Vermont : bridges in the 2011 Tropical Storm Irene. Successfully mitigating s...

  7. Real time assessment of dynamic loads on bridges.

    DOT National Transportation Integrated Search

    2013-05-01

    Highway bridges are an important class of civil structures that are subject to continuously : acting and varying dynamic loads due to traffic. A large number of highway bridges in the US : (bridges on interstate highways or state highways which have ...

  8. Evaluation of Virginia's first heated bridge.

    DOT National Transportation Integrated Search

    2000-12-01

    This study is a contribution to the Heated Bridge Technology Program established in 1991 under the Intermodal Surface Transportation Efficiency Act. The goal of the program was to find durable and environmentally friendly heated bridge technologies f...

  9. Bridge response due to temperature variations.

    DOT National Transportation Integrated Search

    2014-05-01

    In order to more accurately quantify the behavior and degradation of bridges throughout their service life, the : Federal Highway Administration lunched the Long-Term Bridge Performance Program. As part of this program : an I-girder, integral abutmen...

  10. 33 CFR 118.110 - Daymarks and lateral lighting on bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridges. 118.110 Section 118.110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.110 Daymarks and lateral lighting on bridges. (a... through bridges with U.S. aids to navigation system lateral marks and lights installed on the...

  11. 33 CFR 118.110 - Daymarks and lateral lighting on bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridges. 118.110 Section 118.110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.110 Daymarks and lateral lighting on bridges. (a... through bridges with U.S. aids to navigation system lateral marks and lights installed on the...

  12. Monitoring system of arch bridge for safety network management

    NASA Astrophysics Data System (ADS)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  13. A Comparison of Limb-Socket Kinematics of Bone-Bridging and Non-Bone-Bridging Wartime Transtibial Amputations

    DTIC Science & Technology

    2012-05-16

    each successive loading interval. Subset analysis was performed on the basis of amputation type (bone bridging or non bone bridging) and suspension...fitting, patient care. Washington, DC: US Government Printing Office; 1969. 2. Ertl J. Uber amputationsstumpfe. Chirurg. 1949;20:218 24. 3. Pinto MA

  14. ICCK Conference Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, William H.

    2013-05-28

    The 7th International Conference on Chemical Kinetics (ICCK) was held July 10-14, 2011, at Massachusetts Institute of Technology (MIT), in Cambridge, MA, hosted by Prof. William H. Green of MIT's Chemical Engineering department. This cross-disciplinary meeting highlighted the importance of fundamental understanding of elementary reactions to the full range of chemical investigations. The specific conference focus was on elementary-step kinetics in both the gas phase and in condensed phase. The meeting provided a unique opportunity to discuss how the same reactive species and reaction motifs manifest under very different reaction conditions (e.g. atmospheric, aqueous, combustion, plasma, in nonaqueous solvents, onmore » surfaces.). The conference featured special sessions on new/improved experimental techniques, improved models and data analysis for interpreting complicated kinetics, computational kinetics (especially rate estimates for large kinetic models), and a panel discussion on how the community should document/archive kinetic data. In the past, this conference had been limited to homogeneous gas-phase and liquid-phase systems. This conference included studies of heterogeneous kinetics which provide rate constants for, or insight into, elementary reaction steps. This Grant from DOE BES covered about half of the subsidies we provided to students and postdocs who attended the conference, by charging them reduced-rate registration fees. The complete list of subsidies provided are listed in Table 1 below. This DOE funding was essential to making the conference affordable to graduate students, and indeed the attendance at this conference was higher than at previous conferences in this series. Donations made by companies provided additional subsidies, leveraging the DOE funding. The conference was very effective in educating graduate students and important in fostering scientific interactions, particularly between scientists studying gas phase and liquid phase

  15. I-5/Gilman advanced technology bridge project

    NASA Astrophysics Data System (ADS)

    Lanza di Scalea, Francesco; Karbhari, Vistasp M.; Seible, Frieder

    2000-04-01

    The UCSD led I-5/Gilman Advanced Technology Bridge Project will design and construct a fully functional traffic bridge of advanced composite materials across Interstate 5 in La Jolla, California. Its objective is to demonstrate the use of advanced composite technologies developed by the aerospace industry in commercial applications to increase the life expectancy of new structures and for the rehabilitation of aging infrastructure components. The structure will be a 450 ft long, 60 ft wide cable-stayed bridge supported by a 150 ft A-frame pylon with two vehicular lanes, two bicycle lanes, pedestrian walkways and utility tunnels. The longitudinal girders and pylon will be carbon fiber shells filled with concrete. The transverse deck system will consist of hollow glass/carbon hybrid tubes and a polypropylene fiber reinforced concrete deck with an arch action. Selected cables will be composite. The bridge's structural behavior will be monitored to determine how advanced composite materials perform in civil infrastructure applications. The bridge will be instrumented to obtain performance and structural health data in real time and, where possible, in a remote fashion. The sensors applied to the bridge will include electrical resistance strain gages, fiberoptic Bragg gratings and accelerometers.

  16. 3. CONTEXTUAL VIEW OF BRIDGE IN SETTING, LOOKING SOUTHWEST FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. CONTEXTUAL VIEW OF BRIDGE IN SETTING, LOOKING SOUTHWEST FROM ELEVATED GRADE OF EUREKA SOUTHERN RAILROAD. EUREKA SOUTHERN TRUSS BRIDGE AT EXTREME LEFT, 1924 HIGHWAY BRIDGE IN CENTER, 1952 HIGHWAY BRIDGE AT RIGHT - Van Duzen River Bridge, Spanning Van Duzen River at CA State Highway 101, Alton, Humboldt County, CA

  17. 25. VIEW OF McGREGOR BRIDGE (18811936), CROSSING THE MERRIMACK RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. VIEW OF McGREGOR BRIDGE (1881-1936), CROSSING THE MERRIMACK RIVER AT BRIDGE STREET, LOOKING SOUTHEAST. NORTH ELEVATION OF DOUBLE-DECKED, THREE-SPAN DOUGLAS PATENT PARABOLIC IRON TRUSS ERECTED BY CORRUGATED METAL COMPANY (BERLIN IRON BRIDGE COMPANY, BERLIN, CT) From 'Bridge Street Bridge', photographer and date unknown. - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  18. Bridging the gap between science and policy: an international survey of scientists and policy makers in China and Canada.

    PubMed

    Choi, Bernard C K; Li, Liping; Lu, Yaogui; Zhang, Li R; Zhu, Yao; Pak, Anita W P; Chen, Yue; Little, Julian

    2016-02-06

    Bridging the gap between science and policy is an important task in evidence-informed policy making. The objective of this study is to prioritize ways to bridge the gap. The study was based on an online survey of high-ranking scientists and policy makers who have a senior position in universities and governments in the health sector in China and Canada. The sampling frame comprised of universities with schools of public health and medicine and various levels of government in health and public health. Participants included university presidents and professors, and government deputy ministers, directors general and directors working in the health field. Fourteen strategies were presented to the participants for ranking as current ways and ideal ways in the future to bridge the gap between science and policy. Over a 3-month survey period, there were 121 participants in China and 86 in Canada with response rates of 30.0 and 15.9 %, respectively. The top strategies selected by respondents included focus on policy (conducting research that focuses on policy questions), science-policy forums, and policy briefs, both as current ways and ideal ways to bridge the gap between science and policy. Conferences were considered a priority strategy as a current way, but not an ideal way in the future. Canadian participants were more in favor of using information technology (web-based portals and email updates) than their Chinese counterparts. Among Canadian participants, two strategies that were ranked low as current ways (collaboration in study design and collaboration in analysis) became a priority as ideal ways. This could signal a change in thinking in shifting the focus from the "back end" or "downstream" (knowledge dissemination) of the knowledge transfer process to the "front end" or "upstream" (knowledge generation). Our international study has confirmed a number of previously reported priority strategies to bridge the gap between science and policy. More importantly, our

  19. Free energy landscape of a minimalist salt bridge model.

    PubMed

    Li, Xubin; Lv, Chao; Corbett, Karen M; Zheng, Lianqing; Wu, Dongsheng; Yang, Wei

    2016-01-01

    Salt bridges are essential to protein stability and dynamics. Despite the importance, there has been scarce of detailed discussion on how salt bridge partners interact with each other in distinct solvent exposed environments. In this study, employing a recent generalized orthogonal space tempering (gOST) method, we enabled efficient molecular dynamics simulation of repetitive breaking and reforming of salt bridge structures within a minimalist salt-bridge model, the Asp-Arg dipeptide and thereby were able to map its detailed free energy landscape in aqueous solution. Free energy surface analysis shows that although individually-solvated states are more favorable, salt-bridge states still occupy a noticeable portion of the overall population. Notably, the competing forces, e.g. intercharge attractions that drive the formation of salt bridges and solvation forces that pull the charged groups away from each other, are energetically comparable. As the result, the salt bridge stability is highly tunable by local environments; for instance when local water molecules are perturbed to interact more strongly with each other, the population of the salt-bridge states is likely to increase. Our results reveal the critical role of local solvent structures in modulating salt-bridge partner interactions and imply the importance of water fluctuations on conformational dynamics that involves solvent accessible salt bridge formations. © 2015 The Protein Society.

  20. Dynamic testing of the T223 bridge rail.

    DOT National Transportation Integrated Search

    2009-09-01

    The TxDOT T203 bridge rail is often used on bridges where asphalt overlays reduce the effective : height of the bridge rail. This reduction in height due to asphalt paving overlay is undesirable. For this : project, several geometric features were ch...

  1. Implementation of heat-straightening repairs for Louisiana bridges.

    DOT National Transportation Integrated Search

    1998-12-01

    The goal of this study was to implement the latest heat-straightening repair technology on a Louisiana Bridge. The bridge chosen was an overpass just east of Lake Charles crossing 1-10. Working with both state and district personnel, the bridge was r...

  2. Advanced bridge safety initiative: phase 2, task 1 - rivet testing of rivets taken from Maine truss bridge.

    DOT National Transportation Integrated Search

    2016-03-01

    The Maine Department of Transportation (MaineDOT) has removed 25 rivets from an existing, older truss bridge. : Many such truss bridges have low rating factors as determined using Federal Highway Administration (FHWA) : and the American Association o...

  3. Suicides by jumping from iconic bridges in Hong Kong.

    PubMed

    Wong, P W C; Chan, W S C; Lau, T K; Morgan, P R; Yip, P S F

    2009-01-01

    Three bridges in Hong Kong have become iconic sites for suicide since their openings 11 years ago. This retrospective record-based study aimed to examine suicides by jumping from a group of three iconic bridges in Hong Kong, and to explore potential preventive strategies on these bridges to prevent future suicide. We examined the Coroner's files of 12 people who killed themselves by jumping from the bridges between 1997 and 2007. We also examined the Coroner's files of other suicides in 2003, and compared them with the bridge suicides. The majority of the suicides were male, middle-age (40-59 years), married or cohabiting, not living alone, employed or self-employed, and in financial difficulty. None of these cases had a reported psychiatric diagnosis or psychiatric care history, and only one case had a history of suicidal attempt. Compared with other suicides in Hong Kong, the bridge jumpers were more likely to be younger, holding a job, indebted, free from a psychiatric and attempt history, and to leave a suicide note (p < .05). The bridge suicide cases in Hong Kong also appeared to be different from the profiles of bridge jumpers in other countries. Erection of an effective safety barrier has been found to prevent bridge suicides in many countries. Given the different characteristics of bridge jumpers in Hong Kong and the technical difficulties, more innovative ways may be needed to prevent suicides by such means. Potential prevention measures are discussed and, hopefully, will better inform the future design and development of bridges of significance.

  4. Bridge deck deterioration study : final report.

    DOT National Transportation Integrated Search

    1975-03-01

    The basic purpose of this study was to investigate three bridges in the northern section of Louisiana in an attempt to determine if there is sufficient deterioration and corrosion of the reinforcing steel to warrant a comprehensive study of bridge de...

  5. Construction of crack-free bridge decks.

    DOT National Transportation Integrated Search

    2017-04-01

    This serves as the final report on Transportation Pooled-Fund Program Project No. TPF-5(174), Construction : of Crack-Free Bridge Decks. The goal of the study was to implement the most cost-effective techniques for : improving bridge deck life ...

  6. Avoiding the use of a femoral bridging catheter using a two-stage Hemodialysis Reliable Outflow (HeRO) graft implantation technique.

    PubMed

    Yoon, William J; Lorelli, David R

    2015-01-01

    To evaluate a two-stage Hemodialysis Reliable Outflow (HeRO) implantation technique that avoids the use of a femoral bridging catheter versus the conventional one-stage technique requiring a bridging catheter in selected patients. A retrospective review was performed on 20 end-stage renal disease patients with an internal jugular vein (IJV) catheter selected for two-stage HeRO implantation at our institution between January 2010 and March 2013. The arterial graft component (AGC) was implanted without anastomosing it to the target artery (first stage). After AGC incorporation, the venous outflow component was inserted (second stage). The preexisting IJV catheter was maintained for hemodialysis access during the interstage period. Patient characteristics, patency using Kaplan-Meier method and infection rates were analyzed. A total of 17 patients with a mean age of 59 years (70.6% women) completed the two-stage procedure. During the interstage period (mean 12 weeks, range 4-22 weeks), no graft- or surgery-related infection occurred. The need of a femoral bridging catheter was avoided by utilizing the preexisting IJV dialysis catheter. The accumulated HeRO days were 3,916 days with a mean follow-up of 7.7 months (range 1-22.6 months). The HeRO-related infection rate was 0.3/1,000 days. The primary assisted and secondary patency rates at 6 months were 69% and 82%, respectively, which were similar to those of arteriovenous grafts. Staging conferred immediate vascular accessibility. Avoiding the use of a femoral bridging catheter using the two-stage technique may lower infection rate, with comparable primary assisted and secondary patency to arteriovenous grafts and added benefit of immediate cannulatability in this subset of patients.

  7. CONFERENCE LEADERSHIP.

    ERIC Educational Resources Information Center

    Louisiana State Vocational Curriculum Development and Research Center, Natchitoches.

    THIS INSTRUCTIONAL MATERIAL IS FOR USE BY PERSONS WHO CONDUCT CONFERENCE LEADER TRAINING PROGRAMS. SPECIFICALLY, ITS PURPOSE IS TO TRAIN VOCATIONAL TRADE AND INDUSTRIAL EDUCATION PEOPLE TO CONDUCT TRAINING CONFERENCES FOR INDUSTRY. IT IS INTENDED FOR USE IN AREA VOCATIONAL SCHOOLS IN THE PROMOTION AND DEVELOPMENT OF SUPERVISORY PERSONNEL…

  8. 76 FR 78641 - Southwestern Gas Storage Technical Conference; Notice of Public Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... Storage Technical Conference; Notice of Public Conference Take notice that on February 16, 2012 at 9 a.m... technical conference with interested parties to discuss issues related to natural gas storage development in... Cold Weather Event of February 1-5, 2011: Causes and Recommendations, ``[a]dditional gas storage...

  9. Bridge-Scour Data Management System user's manual

    USGS Publications Warehouse

    Landers, Mark N.; Mueller, David S.; Martin, Gary R.

    1996-01-01

    The Bridge-Scour Data Management System (BSDMS) supports preparation, compilation, and analysis of bridge-scour data. The BSDMS provides interactive storage, retrieval, selection, editing, and display of bridge-scour data sets. Bridge-scour data sets include more than 200 site and measurement attributes of the channel geometry, flow hydraulics, hydrology, sediment, geomorphic-setting, location, and bridge specifications. This user's manual provides a general overview of the structure and organization of BSDMS data sets and detailed instructions to operate the program. Attributes stored by the BSDMS are described along with an illustration of the input screen where the attribute can be entered or edited. Measured scour depths can be compared with scour depths predicted by selected published equations using the BSDMS. The selected published equations available in the computational portion of the BSDMS are described. This manual is written for BSDMS, version 2.0. The data base will facilitate: (1) developing improved estimators of scour for specific regions or conditions; (2) describing scour processes; and (3) reducing risk from scour at bridges. BSDMS is available in DOS and UNIX versions. The program was written to be portable and, therefore, can be used on multiple computer platforms. Installation procedures depend on the computer platform, and specific installation instructions are distributed with the software. Sample data files and data sets of 384 pier-scour measurements from 56 bridges in 14 States are also distributed with the software.

  10. Foot force models of crowd dynamics on a wobbly bridge

    PubMed Central

    Belykh, Igor; Jeter, Russell; Belykh, Vladimir

    2017-01-01

    Modern pedestrian and suspension bridges are designed using industry standard packages, yet disastrous resonant vibrations are observed, necessitating multimillion dollar repairs. Recent examples include pedestrian-induced vibrations during the opening of the Solférino Bridge in Paris in 1999 and the increased bouncing of the Squibb Park Bridge in Brooklyn in 2014. The most prominent example of an unstable lively bridge is the London Millennium Bridge, which started wobbling as a result of pedestrian-bridge interactions. Pedestrian phase locking due to footstep phase adjustment is suspected to be the main cause of its large lateral vibrations; however, its role in the initiation of wobbling was debated. We develop foot force models of pedestrians’ response to bridge motion and detailed, yet analytically tractable, models of crowd phase locking. We use biomechanically inspired models of crowd lateral movement to investigate to what degree pedestrian synchrony must be present for a bridge to wobble significantly and what is a critical crowd size. Our results can be used as a safety guideline for designing pedestrian bridges or limiting the maximum occupancy of an existing bridge. The pedestrian models can be used as “crash test dummies” when numerically probing a specific bridge design. This is particularly important because the U.S. code for designing pedestrian bridges does not contain explicit guidelines that account for the collective pedestrian behavior. PMID:29296679

  11. Foot force models of crowd dynamics on a wobbly bridge.

    PubMed

    Belykh, Igor; Jeter, Russell; Belykh, Vladimir

    2017-11-01

    Modern pedestrian and suspension bridges are designed using industry standard packages, yet disastrous resonant vibrations are observed, necessitating multimillion dollar repairs. Recent examples include pedestrian-induced vibrations during the opening of the Solférino Bridge in Paris in 1999 and the increased bouncing of the Squibb Park Bridge in Brooklyn in 2014. The most prominent example of an unstable lively bridge is the London Millennium Bridge, which started wobbling as a result of pedestrian-bridge interactions. Pedestrian phase locking due to footstep phase adjustment is suspected to be the main cause of its large lateral vibrations; however, its role in the initiation of wobbling was debated. We develop foot force models of pedestrians' response to bridge motion and detailed, yet analytically tractable, models of crowd phase locking. We use biomechanically inspired models of crowd lateral movement to investigate to what degree pedestrian synchrony must be present for a bridge to wobble significantly and what is a critical crowd size. Our results can be used as a safety guideline for designing pedestrian bridges or limiting the maximum occupancy of an existing bridge. The pedestrian models can be used as "crash test dummies" when numerically probing a specific bridge design. This is particularly important because the U.S. code for designing pedestrian bridges does not contain explicit guidelines that account for the collective pedestrian behavior.

  12. Hierarchical analysis of bridge decision makers : the role of new technology adoption in the timber bridge market : special project fiscal year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the : United States. The Analytical Hierarchy Process was used to characterize the bridge material selection : decision of these individuals. State Departmen...

  13. Architecture of conference control functions

    NASA Astrophysics Data System (ADS)

    Kausar, Nadia; Crowcroft, Jon

    1999-11-01

    Conference control is an integral part in many-to-many communications that is used to manage and co-ordinate multiple users in conferences. There are different types of conferences which require different types of control. Some of the features of conference control may be user invoked while others are for internal management of a conference. In recent years, ITU (International Telecommunication Union) and IETF (Internet Engineering Task Force) have standardized two main models of conferencing, each system providing a set of conference control functionalities that are not easily provided in the other one. This paper analyzes the main activities appropriate for different types of conferences and presents an architecture for conference control called GCCP (Generic Conference Control Protocol). GCCP interworks different types of conferencing and provides a set of conference control functions that can be invoked by users directly. As an example of interworking, interoperation of IETF's SIP and ITU's H.323 call control functions have been examined here. This paper shows that a careful analysis of a conferencing architecture can provide a set of control functions essential for any group communication model that can be extensible if needed.

  14. Strengthening of rural bridges using rapid-installation FRP technology : route 63 bridge no. H356, Phelps County.

    DOT National Transportation Integrated Search

    2009-10-01

    This report presents the use of externally bonded fiber reinforced polymers (FRP) laminates for the flexural strengthening of a : concrete bridge. The bridge selected for this project is a two-span simply supported reinforced concrete slab with no tr...

  15. Research notes : polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs), Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. Construction of the overlays was less th...

  16. Debris mitigation methods for bridge piers.

    DOT National Transportation Integrated Search

    2012-06-01

    Debris accumulation on bridge piers is an on-going national problem that can obstruct the waterway openings at bridges and result in significant erosion of stream banks and scour at abutments and piers. In some cases, the accumulation of debris can a...

  17. Chapter 10:Hardwoods for timber bridges

    Treesearch

    James P. Wacker; Ed T. Cesa

    2005-01-01

    This chapter describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  18. A Bridge to Active Learning: A Summer Bridge Program Helps Students Maximize Their Active-Learning Experiences and the Active-Learning Experiences of Others.

    PubMed

    Cooper, Katelyn M; Ashley, Michael; Brownell, Sara E

    2017-01-01

    National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly identified that Bridge students had developed sophisticated views of active learning, even though this was not an explicit goal of the program. We conducted an additional set of semistructured interviews that focused on active learning and compared the interviews of Bridge students with those from non-Bridge students who had been eligible for but did not participate in the program. We used the constant comparative method to identify themes from the interviews. We found that Bridge students perceived that, because they knew how to approach active learning and viewed it as important, they benefited more from active learning in introductory biology than non-Bridge students. Specifically, Bridge students seemed to be more aware of their own learning gains from participating in active learning. Compared with the majority of non-Bridge students, the majority of Bridge students described using a greater variety of strategies to maximize their experiences in active learning. Finally, in contrast to non-Bridge students, Bridge students indicated that they take an equitable approach to group work. These findings suggest that we may be able to prime students to maximize their own and other's experiences in active learning. © 2017 K. M. Cooper et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  19. Identifying hidden sexual bridging communities in Chicago.

    PubMed

    Youm, Yoosik; Mackesy-Amiti, Mary Ellen; Williams, Chyvette T; Ouellet, Lawrence J

    2009-07-01

    Bridge populations can play a central role in the spread of human immunodeficiency virus (HIV) by providing transmission links between higher and lower prevalence populations. While social network methods are well suited to the study of bridge populations, analyses tend to focus on dyads (i.e., risk between drug and/or sex partners) and ignore bridges between distinct subpopulations. This study takes initial steps toward moving the analysis of sexual network linkages beyond individual and risk group levels to a community level in which Chicago's 77 community areas are examined as subpopulations for the purpose of identifying potential bridging communities. Of particular interest are "hidden" bridging communities; that is, areas with above-average levels of sexual ties with other areas but whose below-average AIDS prevalence may hide their potential importance for HIV prevention. Data for this analysis came from the first wave of recruiting at the Chicago Sexual Acquisition and Transmission of HIV Cooperative Agreement Program site. Between August 2005 through October 2006, respondent-driven sampling was used to recruit users of heroin, cocaine, or methamphetamine, men who have sex with men regardless of drug use, the sex partners of these two groups, and sex partners of the sex partners. In this cross-sectional study of the sexual transmission of HIV, participants completed a network-focused computer-assisted self-administered interview, which included questions about the geographic locations of sexual contacts with up to six recent partners. Bridging scores for each area were determined using a matrix representing Chicago's 77 community areas and were assessed using two measures: non-redundant ties and flow betweenness. Bridging measures and acquired immunodeficiency syndrome (AIDS) case prevalence rates were plotted for each community area on charts representing four conditions: below-average bridging and AIDS prevalence, below-average bridging and above

  20. Research and development of weathering resistant bridge steel of Shougang

    NASA Astrophysics Data System (ADS)

    Yang, Yongda; Wang, Yanfeng; Huang, Leqing; Di, Guobiao; Ma, Changwen; Ma, Qingshen

    2017-09-01

    To introduce the composition design and mechanical properties and microstructure of the weathering bridge steel which would be used for bridge of Guanting reservoir. We adopt cyclic immersion corrosion test to study corrosion resistance difference of weathering bridge steel and common bridge steel. At the same corrosion time, the weight loss and corrosion rate of weathering bridge steel are lower than the common bridge steel's. Testing phase composition of rust layer by X-ray diffraction, two kinds of test steel's rust layer is mainly composed of Goethite and Fe3O4 and Fe2O3. At the same corrosion time, the percentage composition of goethite in rust layer of weathering bridge steel are significantly higher than common bridge steel's, the higher goethite content is, the compacter rust layer structure is. The compact rust layer would prevent the water and air passing the rust layer, and then preventing the further corrosion reaction, improving the corrosion resistance performance of weathering bridge steel.

  1. A loading study of older highway bridges in Virginia. Pt. 1, Steel truss bridge in Allegheny County.

    DOT National Transportation Integrated Search

    1976-01-01

    A comprehensive field test was conducted on a highway truss bridge in Allegheny County, Virginia, in July 1974. All typical truss members as well as structural members of the bridge floor system were instrumented and unit strains measured when the st...

  2. Aesthetic coatings for concrete bridge components

    NASA Astrophysics Data System (ADS)

    Kriha, Brent R.

    This thesis evaluated the durability and aesthetic performance of coating systems for utilization in concrete bridge applications. The principle objectives of this thesis were: 1) Identify aesthetic coating systems appropriate for concrete bridge applications; 2) Evaluate the performance of the selected systems through a laboratory testing regimen; 3) Develop guidelines for coating selection, surface preparation, and application. A series of site visits to various bridges throughout the State of Wisconsin provided insight into the performance of common coating systems and allowed problematic structural details to be identified. To aid in the selection of appropriate coating systems, questionnaires were distributed to coating manufacturers, bridge contractors, and various DOT offices to identify high performing coating systems and best practices for surface preparation and application. These efforts supplemented a literature review investigating recent publications related to formulation, selection, surface preparation, application, and performance evaluation of coating materials.

  3. 21. View of Clark Fork Vehicle Bridge facing west. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. View of Clark Fork Vehicle Bridge facing west. Looking at bridge deck, guard rail, juncture of two bridge spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  4. Guanidinium-Induced Denaturation by Breaking of Salt Bridges.

    PubMed

    Meuzelaar, Heleen; Panman, Matthijs R; Woutersen, Sander

    2015-12-07

    Despite its wide use as a denaturant, the mechanism by which guanidinium (Gdm(+) ) induces protein unfolding remains largely unclear. Herein, we show evidence that Gdm(+) can induce denaturation by disrupting salt bridges that stabilize the folded conformation. We study the Gdm(+) -induced denaturation of a series of peptides containing Arg/Glu and Lys/Glu salt bridges that either stabilize or destabilize the folded conformation. The peptides containing stabilizing salt bridges are found to be denatured much more efficiently by Gdm(+) than the peptides containing destabilizing salt bridges. Complementary 2D-infrared measurements suggest a denaturation mechanism in which Gdm(+) binds to side-chain carboxylate groups involved in salt bridges. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  5. Analysis of shielded CPW discontinuities with air-bridges

    NASA Technical Reports Server (NTRS)

    Dib, N. I.; Katehi, P. B.; Ponchak, George E.

    1992-01-01

    The effect of air-bridges on the performance of various coplanar waveguides (CPW) discontinuities is studied. Specifically, the coupled open-end CPW's and the short-end shunt CPW stub discontinuities are considered. The high frequency effect of the air-bridge is evaluated using a hybrid technique. At first, the frequency dependent equivalent circuit of the planar discontinuity without the air-bridge is derived using the Space Domain Integral Equation (SDIE) method. Then, the circuit is modified by incorporating the air-bridge's parasitic inductance and capacitance which are evaluated using a simple quasi-static model. The frequency response of each discontinuity with and without the air-bridge is studied and the scattering parameters are plotted in the frequency range 30-50 GHz for typical CPW dimensions.

  6. Instability of the capillary bridge

    NASA Astrophysics Data System (ADS)

    Pare, Gounseti; Hoepffner, Jerome

    2014-11-01

    Capillary adhesion is a physical mechanism that maintains two bodies in contact by capillarity through a liquid ligament. The capillary bridge is an idealization of this capillary adhesion. In this study we first focus on the classical case of the stability of the capillary bridge. Secondly we study a slightly more complex configuration, imagining a flow in the capillary bridge as in the case of the dynamics of the neck of a liquid ligament, in its withdrawal under the effect of capillarity. Inspired by the experiments on soap films of Plateau, the configuration analyzed consists of an initially axisymmetric, mass of fluid held by surface tension forces between two parallel, coaxial, solid pipes of the same diameter. The results presented are obtained by numerical simulations using the free software, Gerris Flow Solver. We first focus on the capillary Venturi. In the static configuration the stability diagram of the capillary bridge obtained is in perfect agreement with the results of Lev A. Slobozhanin. In the dynamic case we develop a matlab code based on the one dimensional equations of Eggers and Dupont. The comparison of the bifurcation diagram obtained and the numerical simulations shows a good agreement.

  7. 4th integrated transportation management systems (ITMS) conference : conference proceedings

    DOT National Transportation Integrated Search

    2001-08-01

    This report documents the proceedings from the 4th Integrated Transportation Management Systems (ITMS) Conference, ITMS: A Key Strategy to Optimize Surface Transportation System Performance, held in Newark, New Jersey on July 15-18, 2001. The Confere...

  8. Effect of voids in grouted post-tensioned concrete bridge construction : inspection and repair manual for external tendons in segmental, post-tensioned bridges.

    DOT National Transportation Integrated Search

    2009-11-01

    Segmental, post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and constructed because they are economical for spanning long distances. In Texas, there are several signature PT bridges. In the l...

  9. 1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING CAUSEWAY, STEEL ARCH, AND EASTBOUND LANE OF NEW BRIDGE UNDER CONSTRUCTION, PARALLELING CAUSEWAY, LOOKING NORTHWEST - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  10. Proceedings of the 11th International Conference on Magnetic Fluids (ICMF 11) (Košice, Slovakia, 23-27 July 2007).

    PubMed

    Kopčanský, Peter; Timko, Milan; Kováč, Josef; Václavíková, Miroslava; Odenbach, Stefan

    2008-05-21

    The 11th International Conference on Magnetic Fluids (ICMF 11) was held in Košice, Slovakia between 23-27 July 2007. Attendance at the conference was high and its motivation was in line with the ten previous ICMF conferences organized in Udine, Orlando, Bangor, Sendai-Tokyo, Riga, Paris, Bhavnagar, Timisoara, Bremen and Guarujá. The conference in Slovakia reflected the scientific community's enthusiasm and worldwide support, with 256 participants, from 30 countries attending.The main objective of ICMF 11 was to promote progress and knowledge in the field of magnetic fluids regarding their chemistry, physical and magnetic properties, heat and mass transfer, surface phenomena, as well as their technological and biomedical applications. As research on magnetic fluids is essentially interdisciplinary, experts from related areas were invited to present their contributions with a view to increasing knowledge in the field and highlighting new trends. Submitted communications were refereed by members of the Scientific Organizing Committee and abstracts were assembled in a book of abstracts. Participants presented 180 posters in two poster sessions and 56 oral presentations. All presentations contributed to a greater understanding of the area, and helped to bridge the gap between physics, chemistry, technology, biology and medical sciences. Contributions to this conference are presented in 115 scientific papers, with some published in Journal of Physics: Condensed Matter and the rest in Magnetohydrodynamics. The organization of the conference was made possible by generous support from the Institute of Experimental Physics and Institute of Geotechnics of the Slovak Academy of Sciences, the University of Pavol Jozef Šafárik and the Slovak Physical Society. Financial support from Ferrotec, Cryosoft Ltd, Mikrochem, Liquids Research Ltd, Askony and US Steel Košice, is also gratefully acknowledged.

  11. GOOD HEALTH AND THE BRIDGING OF STRUCTURAL HOLES

    PubMed Central

    Cornwell, Benjamin

    2009-01-01

    Bridges that span structural holes are often explained in terms of the entrepreneurial personalities or rational motivations of brokers, or structural processes that lead to the intersection of social foci. I argue that the existence and use of bridges in interpersonal networks also depends on individuals’ health. Poor health may make it more difficult to withstand the pressures and to execute some of the common tasks associated with bridging (e.g., brokerage). I examine this possibility using egocentric network data on over 2,500 older adults drawn from the recent National Social Life, Health, and Aging Project (NSHAP). Multivariate regression analyses show that both cognitive and functional health are significantly positively associated with bridging, net of sociodemographic and life-course controls. The relationship between functional (kinesthetic) health and bridging appears to be partially mediated by network composition, as older adults who have poorer functional health also tend to have networks that are richer in strong ties. Several potential mediation mechanisms are discussed. Cognitive function remains significantly associated with bridging net of network composition, suggesting that the inherent challenges of maintaining bridging positions may be more difficult to cope with for those who have cognitive impairments than for those who have functional impairments such as limited mobility. An alternative explanation is that cognitively impaired individuals have more difficulty recognizing (and thus strategically using) bridges in their networks. Theoretical implications and possibilities for future research are discussed. PMID:20046998

  12. 28. Under ninth bridge, view to concrete dam and eighth ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Under ninth bridge, view to concrete dam and eighth bridge in background during heavy rain, view to the SW. - Vicksburg National Military Park Roads & Bridges, Melan Arch Bridges, Spanning various tributaries at Confederate Avenue, Vicksburg, Warren County, MS

  13. Random vibration analysis of train-bridge under track irregularities and traveling seismic waves using train-slab track-bridge interaction model

    NASA Astrophysics Data System (ADS)

    Zeng, Zhi-Ping; Zhao, Yan-Gang; Xu, Wen-Tao; Yu, Zhi-Wu; Chen, Ling-Kun; Lou, Ping

    2015-04-01

    The frequent use of bridges in high-speed railway lines greatly increases the probability that trains are running on bridges when earthquakes occur. This paper investigates the random vibrations of a high-speed train traversing a slab track on a continuous girder bridge subjected to track irregularities and traveling seismic waves by the pseudo-excitation method (PEM). To derive the equations of motion of the train-slab track-bridge interaction system, the multibody dynamics and finite element method models are used for the train and the track and bridge, respectively. By assuming track irregularities to be fully coherent random excitations with time lags between different wheels and seismic accelerations to be uniformly modulated, non-stationary random excitations with time lags between different foundations, the random load vectors of the equations of motion are transformed into a series of deterministic pseudo-excitations based on PEM and the wheel-rail contact relationship. A computer code is developed to obtain the time-dependent random responses of the entire system. As a case study, the random vibration characteristics of an ICE-3 high-speed train traversing a seven-span continuous girder bridge simultaneously excited by track irregularities and traveling seismic waves are analyzed. The influence of train speed and seismic wave propagation velocity on the random vibration characteristics of the bridge and train are discussed.

  14. The 2009 National Environmental Public Health Conference: one model for planning green and healthy conferences.

    PubMed

    Ruckart, Perri Zeitz; Moore, Cory; Burgin, Deborah; Byrne, Maggie Kelly

    2011-01-01

    The Centers for Disease Control and Prevention's National Center for Environmental Health and the Agency for Toxic Substances and Disease Registry committed to making their 2009 National Environmental Public Health Conference a model for green and healthy conferences. The conference included increased opportunities for physical activity, both as part of conference events and for transportation to the conference. In addition, conference meals were healthy and sustainably sourced. The conference also implemented intuitive, accessible recycling; online scheduling and evaluation to minimize hard-copy materials; and the purchase of carbon offsets to reduce the unwanted environmental impact of the conference. Public health professionals have an opportunity and obligation to support healthy behaviors at their events and to serve as leaders in this area. Facilitating healthy and sustainable choices is in alignment with goals for both public health and broader social issues-such as environmental quality-that have a direct bearing on public health.

  15. Wearing surface testing : Yukon River bridge.

    DOT National Transportation Integrated Search

    2012-12-01

    The Yukon River Bridge, also known as the E.L. Patton Bridge, carries the twolane Dalton Highway and the trans-Alaska oil pipeline across the Yukon River at a 6% : grade. It is 30 feet wide, with 6 spans; it was designed to withstand -60 degrees Fahr...

  16. Neighborhood Bridges: 2010-2011 Evaluation Report

    ERIC Educational Resources Information Center

    Ingram, Debra

    2011-01-01

    In 2010-2011, students in twenty-five classrooms from eleven schools in the Minneapolis-Saint Paul metropolitan area participated in The Children's Theatre Company's Neighborhood Bridges (Bridges) program. The Children's Theatre Company contracted with the University of Minnesota's Center for Applied Research and Educational Improvement (CAREI) to…

  17. Live Load Testing of Historic Covered Timber Bridges

    Treesearch

    Travis Hosteng; James Wacker; Brent Phares

    2013-01-01

    The National Historic Covered Bridge Preservation Program (NHCBP), sponsored by the Federal Highway Administration (FHWA), is intended to preserve covered timber bridge structures nationwide. Today, less than 700 covered timber bridges still exist in the United States and of those many are closed to vehicular traffic. Furthermore, a large percentage of the remaining...

  18. Response modification for enhanced operation and safety of bridges.

    DOT National Transportation Integrated Search

    2011-08-01

    This report shows that safe extension of the service life of existing bridge structures is possible through bridge : health monitoring and structural response modification. To understand bridge health monitoring and structural : response modification...

  19. Conference Resolution

    NASA Astrophysics Data System (ADS)

    2009-04-01

    Since the first IUPAP International Conference on Women in Physics (Paris, March 2002) and the Second Conference (Rio de Janeiro, May 2005), progress has continued in most countries and world regions to attract girls to physics and advance women into leadership roles, and many working groups have formed. The Third Conference (Seoul, October 2008), with 283 attendees from 57 countries, was dedicated to celebrating the physics achievements of women throughout the world, networking toward new international collaborations, building each participant's capacity for career success, and aiding the formation of active regional working groups to advance women in physics. Despite the progress, women remain a small minority of the physics community in most countries.

  20. T-section glulam timber bridge modules : modeling and performance

    Treesearch

    Paul A. Morgan; Steven E. Taylor; Michael A. Ritter; John M. Franklin

    1999-01-01

    This paper describes the design, modeling, and testing of two portable timber bridges, each consisting of two noninterconnected longitudinal glued-laminated timber (glulam) deck panels 1.8 m (6 ft) wide. One bridge is 12.2 m (40 ft) long while the other bridge is 10.7 m (35 ft) long. The deck panels are fabricated in a unique double-tee cross section. The bridges...

  1. Effects of Irregular Bridge Columns and Feasibility of Seismic Regularity

    NASA Astrophysics Data System (ADS)

    Thomas, Abey E.

    2018-05-01

    Bridges with unequal column height is one of the main irregularities in bridge design particularly while negotiating steep valleys, making the bridges vulnerable to seismic action. The desirable behaviour of bridge columns towards seismic loading is that, they should perform in a regular fashion, i.e. the capacity of each column should be utilized evenly. But, this type of behaviour is often missing when the column heights are unequal along the length of the bridge, allowing short columns to bear the maximum lateral load. In the present study, the effects of unequal column height on the global seismic performance of bridges are studied using pushover analysis. Codes such as CalTrans (Engineering service center, earthquake engineering branch, 2013) and EC-8 (EN 1998-2: design of structures for earthquake resistance. Part 2: bridges, European Committee for Standardization, Brussels, 2005) suggests seismic regularity criterion for achieving regular seismic performance level at all the bridge columns. The feasibility of adopting these seismic regularity criterions along with those mentioned in literatures will be assessed for bridges designed as per the Indian Standards in the present study.

  2. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  3. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  4. Dynamics and statics of nonaxisymmetric and symmetric liquid bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnick, Andrew H.; Kaukler, William F.; Zhang, Yiqiang

    1994-01-01

    This program of theoretical and experimental ground-based research focuses on the understanding of the dynamics and stability limits of nonaxisymmetric and symmetric liquid bridges. There are three basic objectives: First, to determine the stability limits of nonaxisymmetric liquid bridges held between non-coaxial parallel disks, Second, to examine the dynamics of nonaxisymmetric bridges and nonaxisymmetric oscillations of initially axisymmetric bridges. The third objective is to experimentally investigate the vibration sensitivity of liquid bridges under terrestrial and low gravity conditions. Some of these experiments will require a low gravity environment and the ground-based research will culminate in a definitive flight experiment.

  5. Load ratings for standard bridges : final report, October 2008.

    DOT National Transportation Integrated Search

    2008-10-01

    A load rating states the load in tons which a vehicle can impose on a bridge. Changes in guidelines, standards, and customary uses of bridges require analyses of bridges to be updated and reevaluated.

  6. Eighteen Years of the Great Lakes Regional Counseling Psychology Conference: Revisiting the Need for Regional Conferences

    ERIC Educational Resources Information Center

    Delgado-Romero, Edward A.; Bowman, Sharon L.; Gerstein, Lawrence H.

    2006-01-01

    The Great Lakes Regional Conference on Counseling Psychology is the only conference to continuously fulfill the 1987 mandate issued by Division 17 for regional counseling conferences. The rationale for regional conferences is reviewed, and the 18-year history of the Great Lakes Regional Conference is examined. The authors conclude by noting the…

  7. Myocardial bridges, neither rare nor isolated-Autopsy study.

    PubMed

    Teofilovski-Parapid, G; Jankovic, R; Kanjuh, V; Virmani, R; Danchin, N; Prates, N; Simic, D V; Parapid, B

    2017-03-01

    Myocardial bridge is a congenital anomaly with a markedly variable reported incidence on autopsy (4.7%-86%), likely related to geographical regions. Our previous retrospective study showed a prevalence of 0.8%, which we doubted to be the true one in the examined sample of the Serbian population. To assess the importance of the phenomenon we conducted a 2-year prospective study at the same institution. Ninety-six cadaver hearts from adult individuals of both genders (51 men, 45 women) who died from natural causes underwent special dissection. Tunneled coronary arteries and myocardium were examined using light microscopy. A total of 14 myocardial bridges were found in 13 (13.54%) hearts. This anomaly was insignificantly more common in men (13.72% vs. 13.33%, p>0.05). In one heart we noted two myocardial bridges (the left anterior interventricular artery and left marginal artery were overbridged). None of the myocardial bridges had been diagnosed during life. The most common causes of death were cardiac related. Myocardial bridges were located in the following areas: left anterior interventricular (50%), left circumflex artery (28.6%), left marginal artery (14.3%), and right coronary artery (7.1%). In 92.3% of cases, the right coronary artery was dominant. The only heart with a balanced-type had two bridges. Most of the myocardial bridges were long and deep. All tunneled coronary arteries, and although surrounded by "coronary cushion," were not protected from atherosclerosis. In 30.8% of hearts with myocardial bridges, we found additional coronary artery anomalies. Myocardial bridges were not rare in the examined sample of the Serbian population and were often associated with other coronary artery anomalies, rendering the carriers at higher risk. Copyright © 2016 Elsevier GmbH. All rights reserved.

  8. Parent Conferences. Beginnings Workshop.

    ERIC Educational Resources Information Center

    Duffy, Roslyn; And Others

    1997-01-01

    Presents six workshop sessions on parent conferences: (1) "Parents' Perspectives on Conferencing" (R. Duffy); (2) "Three Way Conferences" (G. Zeller); (3) "Conferencing with Parents of Infants" (K. Albrecht); (4) "Conferencing with Parents of School-Agers" (L. G. Miller); (5) "Cross Cultural Conferences" (J. Gonzalez-Mena); and (6) "Working with…

  9. Railing systems for use on timber deck bridges

    Treesearch

    Ronald K. Faller; Michael A. Ritter; Barry T. Rosson; Sheila R. Duwadi

    1999-01-01

    Bridge railing systems in the United States have historically been designed based on static load criteria given in the AASHTO Standard Specifications for Highway Bridges. In the past decade, full-scale vehicle crash testing has been recognized as a more appropriate and reliable method of evaluating bridge railing acceptability. In 1989. AASHTO published the Guide...

  10. Dynamics and Statics of Nonaxisymmetric Liquid Bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnick, Andrew H.; Slobozhanin, L. A.

    1996-01-01

    Theoretical and experimental investigation of the stability of nonaxisymmetric and nonaxisymmetric bridges contained between equal and unequal radii disks as a function of Bond and Weber number with emphasis on the transition from unstable axisymmetric to stable nonaxisymmetric shapes, are conducted. Numerical analysis of the stability of nonaxisymmetric bridges between unequal disks for various orientations of the gravity vector is performed. Experimental and theoretical investigation of large (nonaxisymmetric) oscillations and breaking of liquid bridges are also conducted.

  11. Threats, protests greet conference.

    PubMed

    Struck, D

    1994-09-04

    In preparation for the 1994 International Conference on Population and Development, Egypt has deployed 14,000 police to protect participants from threatened violence. The Vatican has joined forces with Muslim fundamentalists to condemn the conference as a vehicle for imposing Western ideals, particularly abortion, on Third world countries. In addition, the opposition is raising the specter of a descent of homosexuals onto Cairo and Muslim fundamentalists have threatened to murder Western representatives. A suit filed by Islamic lawyers, aimed at stopping the conference, failed. Sudan and Saudi Arabia plan to boycott the conference, and it remains uncertain whether Libya will be represented. Conference organizers have not been deterred by the threats and note that the controversy has drawn public attention to the central issues under debate.

  12. OLD SUSPENSION BRIDGE. This view appears to be looking southeast, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OLD SUSPENSION BRIDGE. This view appears to be looking southeast, at the downstream side of the suspension bridge, which was replaced by the South Fork Trinity River Bridge - South Fork Trinity River Bridge, State Highway 299 spanning South Fork Trinity River, Salyer, Trinity County, CA

  13. A study on carbon nanotube bridge as a electromechanical memory device

    NASA Astrophysics Data System (ADS)

    Kang, Jeong Won; Ha Lee, Jun; Joo Lee, Hoong; Hwang, Ho Jung

    2005-04-01

    A nanoelectromechanical (NEM) nanotube random access memory (NRAM) device based on carbon nanotube (CNT) was investigated using atomistic simulations. For the CNT-based NEM memory, the mechanical properties of the CNT-bridge and van der Waals interactions between the CNT-bridge and substrate were very important. The critical amplitude of the CNT-bridge was 16% of the length of the CNT-bridge. As molecular dynamics time increased, the CNT-bridge went to the steady state under the electrostatic force with the damping of the potential and the kinetic energies of the CNT-bridge. The interatomic interaction between the CNT-bridge and substrate, value of the CNT-bridge slack, and damping rate of the CNT-bridge were very important for the operation of the NEM memory device as a nonvolatile memory.

  14. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs

    ERIC Educational Resources Information Center

    Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to…

  15. BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges

    NASA Astrophysics Data System (ADS)

    Dang, N. S.; Shim, C. S.

    2018-04-01

    Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.

  16. The General Conference Mennonites.

    ERIC Educational Resources Information Center

    Ediger, Marlow

    General Conference Mennonites and Old Order Amish are compared and contrasted in the areas of physical appearance, religious beliefs, formal education, methods of farming, and home settings. General Conference Mennonites and Amish differ in physical appearance and especially in dress. The General Conference Mennonite men and women dress the same…

  17. Myocardial bridges of the coronary arteries in the human fetal heart.

    PubMed

    Cakmak, Yusuf Ozgür; Cavdar, Safiye; Yalin, Aymelek; Yener, Nuran; Ozdogmus, Omer

    2010-09-01

    During the last century, many investigators reported on myocardial bridges in the adult human heart. In the present study, 39 human fetal hearts (the mean gestastional age was 30 weeks) were studied for myocardial bridging, and the results were correlated with adult data. Among the 39 (27 male and 12 female) fetal hearts studied, 26 bridges were observed on 18 fetal hearts (46.2%). Ten of the bridges had one myocardial bridge, whereas double myocardial bridges were observed in eight fetal hearts. The most frequent myocardial bridges were observed on the left anterior descending artery (LAD), which had 13 bridges (50%). Eight (30.7%) myocardial bridges were on the diagonal artery, and on the posterior descending artery there were five (19.3%). Myocardial bridges were not observed on the circumflex artery. The data presented in this study may provide potentially useful information for the preoperative evaluation of the newborn and may have a clinical implication for sudden fetal death.

  18. Overview of the National Timber Bridge Inspection Study

    Treesearch

    James P. Wacker; Brian K. Brashaw; Frank Jalinoos

    2013-01-01

    As many engineers begin to implement life cycle cost analyses within the preliminary bridge design phase, there is a significant need for more reliable data on the expected service life of highway bridges. Many claims are being made about the expected longevity of concrete and steel bridges, but few are based on actual performance data. Because engineers are least...

  19. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Lights on swing bridges. 118.70... LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each... an approaching vessel the swing span when closed will display three red lights on top of the span...

  20. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  1. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  2. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Lights on swing bridges. 118.70... LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each... an approaching vessel the swing span when closed will display three red lights on top of the span...

  3. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  4. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on swing bridges. 118.70... LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each... an approaching vessel the swing span when closed will display three red lights on top of the span...

  5. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  6. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Lights on swing bridges. 118.70... LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each... an approaching vessel the swing span when closed will display three red lights on top of the span...

  7. Evaluation of a Concrete Continuous Beam Bridge Using Load Test

    NASA Astrophysics Data System (ADS)

    Zhang, Xiedong; Li, Hong; Li, Xiaofan; Xiang, Musheng; Shen, Chengwu

    2007-03-01

    Load test is an efficient way to evaluate highway bridges. This paper presents static and dynamic load tests on a prestressed concrete continuous beam bridge. We obtained the influence line and the vibration property of the bridge from FEM analysis. The stress, deformation and the vibration characteristics of the bridge were measured. We found that the measured data are consistent with those from the theoretical calculation, indicating good condition of the bridge.

  8. 46 CFR 113.35-17 - Vessels with navigating bridge control.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Vessels with navigating bridge control. 113.35-17... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop on each telegraph transmitter that prevents movement to the “Navigating Bridge Control” position...

  9. 26. VIEW FROM EAST IN BRIDGE TENDER'S HOUSE, LEVERS FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. VIEW FROM EAST IN BRIDGE TENDER'S HOUSE, LEVERS FOR GASOLINE ENGINE OPERATION FOR BRIDGE AND THEIR CONNECTIONS TO CONTROL RODS ON DOWNSTREAM SIDE OF SWING-SPAN; new bridge located in background - Tipers Bridge, Spanning Great Wicomico River at State Route 200, Kilmarnock, Lancaster County, VA

  10. 2. VIEW SHOWING SOUTH ELEVATION OF BRIDGE, LOOKING NORTH. THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW SHOWING SOUTH ELEVATION OF BRIDGE, LOOKING NORTH. THE ROCK ISLAND LINE RAILROAD BRIDGE CAN BE SEEN IN THE BACKGROUND TO THE NORTH, WITH THE BURLINGTON STREET BRIDGE IN THE DISTANCE Ryan - Benton Street Bridge, Spanning Iowa River at Benton Street, Iowa City, Johnson County, IA

  11. 46 CFR 113.35-17 - Vessels with navigating bridge control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Vessels with navigating bridge control. 113.35-17... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop on each telegraph transmitter that prevents movement to the “Navigating Bridge Control” position...

  12. Implementation of sustainability in bridge design, construction and maintenance.

    DOT National Transportation Integrated Search

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  13. An expert system for the esthetic rating of bridges.

    DOT National Transportation Integrated Search

    1990-01-01

    The expert system presented should facilitate the in-depth analysis of bridge esthetics and encourage high standards for the appearance of bridges. The procedure described systematically evaluates features of a target bridge in relation to a similar ...

  14. A Hierarchical Analysis of Bridge Decision Makers; the Role of New Technology Adoption in the Timber Bridge Market: Special Project Fiscal Year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decsions across the U.S. The Analytical Hierarchical Process was used to characterize the bridge material selection decisions of these individuals. State Departments of Trans...

  15. Students' Conceptions of Mathematics Bridging Courses

    ERIC Educational Resources Information Center

    Gordon, Sue; Nicholas, Jackie

    2013-01-01

    In this study we investigate the conceptions of mathematics bridging courses held by students enrolled in these courses at a major Australian university. We report on the participants' responses to email-interview questions about the mathematics bridging courses to describe a two-dimensional outcome space of variations in awareness about the…

  16. Theoretical mechanics: crowd synchrony on the Millennium Bridge.

    PubMed

    Strogatz, Steven H; Abrams, Daniel M; McRobie, Allan; Eckhardt, Bruno; Ott, Edward

    2005-11-03

    Soon after the crowd streamed on to London's Millennium Bridge on the day it opened, the bridge started to sway from side to side: many pedestrians fell spontaneously into step with the bridge's vibrations, inadvertently amplifying them. Here we model this unexpected and now notorious phenomenon--which was not due to the bridge's innovative design as was first thought--by adapting ideas originally developed to describe the collective synchronization of biological oscillators such as neurons and fireflies. Our approach should help engineers to estimate the damping needed to stabilize other exceptionally crowded footbridges against synchronous lateral excitation by pedestrians.

  17. Super-bridges suspended over carbon nanotube cables

    NASA Astrophysics Data System (ADS)

    Carpinteri, Alberto; Pugno, Nicola M.

    2008-11-01

    In this paper the new concept of 'super-bridges', i.e. kilometre-long bridges suspended over carbon nanotube cables, is introduced. The analysis shows that the use of realistic (thus defective) carbon nanotube bundles as suspension cables can enlarge the current limit main span by a factor of ~3. Too large compliance and dynamic self-excited resonances could be avoided by additional strands, rendering the super-bridge anchored as a spider's cobweb. As an example, we have computed the limit main spans of the current existing 19 suspended-deck bridges longer than 1 km assuming them to have substituted their cables with carbon nanotube bundles (thus maintaining the same geometry, with the exception of the length) finding spans of up to ~6.3 km. We thus suggest that the design of the Messina bridge in Italy, which would require a main span of ~3.3 km, could benefit from the use of carbon nanotube bundles. We believe that their use represents a feasible and economically convenient solution. The plausibility of these affirmations is confirmed by a statistical analysis of the existing 100 longest suspended bridges, which follow a Zipf's law with an exponent of 1.1615: we have found a Moore-like (i.e. exponential) law, in which the doubling of the capacity (here the main span) per year is substituted by the factor 1.0138. Such a law predicts that the realization of the Messina bridge using conventional materials will only occur around the middle of the present century, whereas it could be expected in the near future if carbon nanotube bundles were used. A simple cost analysis concludes the paper.

  18. Waterside Security 2010 (WSS 2010) Conference: Post Conference Report

    DTIC Science & Technology

    2011-02-01

    Memorandum Report NURC-MR-2011-002 Waterside Security 2010 (WSS2010) Conference: post conference report Ronald Kessel and...in NATO, NURC conducts maritime research in support of NATO’s operational and transformation requirements. Reporting to the Supreme Allied Commander...independent business process certification. Copyright © NURC 2011. NATO member nations have unlimited rights to use, modify, reproduce, release

  19. Long-term behavior of integral abutment bridges : [technical summary].

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment bridges, a type of jointless bridge, are the construction option of choice when designing highway bridges in many parts of the country. Rather than providing an expansion joint to separate the substructure from the superstructure to...

  20. Simple model of cable-stayed bridge deck subjected to static wind loading

    NASA Astrophysics Data System (ADS)

    Kang, Yi-Lung; Wang, Yang Cheng

    1997-05-01

    Cable-stayed bridges have been known since 18th century with aesthetics design. The structural system and the structural behavior are significantly different from those of continuous bridges. Compared to continuous bridge, cable- stayed bridges have more flexure bridge deck than those of continuous bridges.On the other hand, cable-stayed bridges have less stiffness to resist wind loading especially for lateral loads. The first considering of bridge engineering is safety. In 1940's, Tacoma Narrows Suspension Bridge destroyed by wind loading is a good example even though it is not a cable-stayed bridge. After the bridge was destroyed, a lot of research articles have been published regarding cable supported bridge subjected to wind loading. In recent days, high strength materials have been served. The bridge engineers use the advantages to expand the span length of cable-stayed bridges. Due to the span length increased and the use of high strength materials, cable- stayed bridges have more significant nonlinear behavior subjected to wind loading. In this paper, a slice bridge deck of cable-stayed bridge connected to internal support cables is considered. The deck has been considered to be subjected to lateral static wind loading. Since cables can not take compressive force, the deck has strongly nonlinear behavior even though the materials are linear elastic. Several primary load combinations have ben considered in this paper such as the bridge deck supposed to be moved horizontally without rotation or the bridge deck supposed to be moved horizontally with rotational deformation. The mathematical formulas and the numerical solutions are found and represented in graphical forms. The results can be provided to bridge designers and researchers for further study of this type of structure subjected to wind loading.

  1. Monitoring Bridge Dynamic Deformation in Vibration by Digital Photography

    NASA Astrophysics Data System (ADS)

    Yu, Chengxin; Zhang, Guojian; Liu, Xiaodong; Fan, Li; Hai, Hua

    2018-01-01

    This study adopts digital photography to monitor bridge dynamic deformation in vibration. Digital photography in this study is based on PST-TBPM (photographing scale transformation-time baseline parallax method). Firstly, we monitor the bridge in static as a zero image. Then, we continuously monitor the bridge in vibration as the successive images. Based on the reference points on each image, PST-TBPM is used to calculate the images to obtain the dynamic deformation values of these deformation points. Results show that the average measurement accuracies are 0.685 pixels (0.51mm) and 0.635 pixels (0.47mm) in X and Z direction, respectively. The maximal deformations in X and Z direction of the bridge are 4.53 pixels and 5.21 pixels, respectively. PST-TBPM is valid in solving the problem that the photographing direction is not perpendicular to the bridge. Digital photography in this study can be used to assess bridge health through monitoring the dynamic deformation of a bridge in vibration. The deformation trend curves also can warn the possible dangers over time.

  2. Structural Bridges through Fold Space.

    PubMed

    Edwards, Hannah; Deane, Charlotte M

    2015-09-01

    Several protein structure classification schemes exist that partition the protein universe into structural units called folds. Yet these schemes do not discuss how these units sit relative to each other in a global structure space. In this paper we construct networks that describe such global relationships between folds in the form of structural bridges. We generate these networks using four different structural alignment methods across multiple score thresholds. The networks constructed using the different methods remain a similar distance apart regardless of the probability threshold defining a structural bridge. This suggests that at least some structural bridges are method specific and that any attempt to build a picture of structural space should not be reliant on a single structural superposition method. Despite these differences all representations agree on an organisation of fold space into five principal community structures: all-α, all-β sandwiches, all-β barrels, α/β and α + β. We project estimated fold ages onto the networks and find that not only are the pairings of unconnected folds associated with higher age differences than bridged folds, but this difference increases with the number of networks displaying an edge. We also examine different centrality measures for folds within the networks and how these relate to fold age. While these measures interpret the central core of fold space in varied ways they all identify the disposition of ancestral folds to fall within this core and that of the more recently evolved structures to provide the peripheral landscape. These findings suggest that evolutionary information is encoded along these structural bridges. Finally, we identify four highly central pivotal folds representing dominant topological features which act as key attractors within our landscapes.

  3. 33 CFR 115.30 - Sufficiency of State authority for bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for bridges. 115.30 Section 115.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.30 Sufficiency of State authority for bridges. An opinion of the attorney general of the State as to the sufficiency of State...

  4. 14. Fifth Melan Bridge on tour route, Union Avenue near ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Fifth Melan Bridge on tour route, Union Avenue near Park Boundary, elevation view to the north, showing Culvert beyond park boundary. (bridge has now been replaced with box culvert). - Vicksburg National Military Park Roads & Bridges, Melan Arch Bridges, Spanning various tributaries at Confederate Avenue, Vicksburg, Warren County, MS

  5. 33 CFR 115.30 - Sufficiency of State authority for bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for bridges. 115.30 Section 115.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.30 Sufficiency of State authority for bridges. An opinion of the attorney general of the State as to the sufficiency of State...

  6. Application of Artificial Intelligence for Bridge Deterioration Model.

    PubMed

    Chen, Zhang; Wu, Yangyang; Li, Li; Sun, Lijun

    2015-01-01

    The deterministic bridge deterioration model updating problem is well established in bridge management, while the traditional methods and approaches for this problem require manual intervention. An artificial-intelligence-based approach was presented to self-updated parameters of the bridge deterioration model in this paper. When new information and data are collected, a posterior distribution was constructed to describe the integrated result of historical information and the new gained information according to Bayesian theorem, which was used to update model parameters. This AI-based approach is applied to the case of updating parameters of bridge deterioration model, which is the data collected from bridges of 12 districts in Shanghai from 2004 to 2013, and the results showed that it is an accurate, effective, and satisfactory approach to deal with the problem of the parameter updating without manual intervention.

  7. Application of Artificial Intelligence for Bridge Deterioration Model

    PubMed Central

    Chen, Zhang; Wu, Yangyang; Sun, Lijun

    2015-01-01

    The deterministic bridge deterioration model updating problem is well established in bridge management, while the traditional methods and approaches for this problem require manual intervention. An artificial-intelligence-based approach was presented to self-updated parameters of the bridge deterioration model in this paper. When new information and data are collected, a posterior distribution was constructed to describe the integrated result of historical information and the new gained information according to Bayesian theorem, which was used to update model parameters. This AI-based approach is applied to the case of updating parameters of bridge deterioration model, which is the data collected from bridges of 12 districts in Shanghai from 2004 to 2013, and the results showed that it is an accurate, effective, and satisfactory approach to deal with the problem of the parameter updating without manual intervention. PMID:26601121

  8. Threshold fluctuations in a superconducting current-carrying bridge

    NASA Astrophysics Data System (ADS)

    Marychev, P. M.; Vodolazov, D. Yu

    2017-07-01

    We calculate the energy of threshold fluctuation δ {F}{{thr}} which triggers the transition of a superconducting current-carrying bridge to the resistive state. We show that the dependence δ {F}{{thr}}{(I)\\propto {I}{{dep}}{\\hslash }(1-I/{I}{{dep}})}5/4/e, found by Langer and Ambegaokar for a long bridge with length L\\gg ξ , holds far below the critical temperature in both dirty and clean limits (here I dep is the depairing current of the bridge and ξ is a coherence length). We also find that even a ‘weak’ local defect (leading to a small suppression of the critical current of the bridge {I}{{c}}≲ {I}{{dep}}) provides δ {F}{{thr}}\\propto {I}{{c}}{\\hslash }{(1-I/{I}{{c}})}3/2/e, typical for a short bridge with L\\ll ξ or a Josephson junction.

  9. Consistency of the New York State bridge inspection program.

    DOT National Transportation Integrated Search

    2013-09-01

    The New York State Department of Transportation (NYSDOT) maintains an inventory of over 17,000 highway : bridges across the state. As per New York States Uniform Code of Bridge Inspections, all bridges in New York : State are inspected biennially,...

  10. Exploring the relevance of thiophene rings as bridge unit in acceptor-bridge-donor dyes on self-aggregation and performance in DSSCs.

    PubMed

    Zarate, Ximena; Saavedra-Torres, Mario; Rodriguez-Serrano, Angela; Gomez, Tatiana; Schott, Eduardo

    2018-04-30

    The possibility of dye charge recombination in DSSCs remains a challenge for the field. This consists of: (a) back-transfer from the TiO 2 to the oxidized dye and (b) intermolecular electron transfer between dyes. The latter is attributed to dye aggregation due to dimeric conformations. This leads to poor electron injection which decreases the photocurrent conversion efficiency. Most organic sensitizers are characterized by an Acceptor-Bridge-Donor (A-Bridge-D) arrangement that is commonly employed to provide charge separation and, therefore, lowering the unwanted back-transfer. Here, we address the intermolecular electron transfer by studying the dimerization and photovoltaic performance of a group of A-Bridge-D structured dyes. Specifically, eight famous sulfur containing π-bridges were analyzed (A and D remained fixed). Through quantum mechanical and molecular dynamics approaches, it was found that the formation of weakly stabilized dimers is allowed. The dyes with covalently bonded and fused thiophene rings as Bridges, 6d and 7d as well as 8d with a fluorene, would present high aggregation and, therefore, high probability of recombination processes. Conversely, using TiO 2 cluster and surface models, delineated the shortest bridges to improve the adsorption energy and the stability of the system. Finally, the elongation of the bridge up to 2 and 3 units and their photovoltaic parameters were studied. These results showed that all the sensitizers are able to provide similar photocurrent outcomes, regardless of whether the bridge is elongated. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  11. Damage identification in highway bridges using distribution factors

    NASA Astrophysics Data System (ADS)

    Gangone, Michael V.; Whelan, Matthew J.

    2017-04-01

    The U.S. infrastructure system is well behind the needs of the 21st century and in dire need of improvements. The American Society of Civil Engineers (ASCE) graded America's Infrastructure as a "D+" in its recent 2013 Report Card. Bridges are a major component of the infrastructure system and were awarded a "C+". Nearly 25 percent of the nation's bridges are categorized as deficient by the Federal Highway Administration (FWHA). Most bridges were designed with an expected service life of roughly 50 years and today the average age of a bridge is 42 years. Finding alternative methods of condition assessment which captures the true performance of the bridge is of high importance. This paper discusses the monitoring of two multi-girder/stringer bridges at different ages of service life. Normal strain measurements were used to calculate the load distribution factor at the midspan of the bridge under controlled loading conditions. Controlled progressive damage was implemented to one of the superstructures to determine if the damage could be detected using the distribution factor. An uncertainty analysis, based on the accuracy and precision of the normal strain measurement, was undertaken to determine how effective it is to use the distribution factor measurement as a damage indicator. The analysis indicates that this load testing parameter may be an effective measure for detecting damage.

  12. Expected damages of retrofitted bridges with RC jacketing

    NASA Astrophysics Data System (ADS)

    Montes, O.; Jara, J. M.; Jara, M.; Olmos, B. A.

    2015-07-01

    The bridge infrastructure in many countries of the world consists of medium span length structures built several decades ago and designed for very low seismic forces. Many of them are reinforced concrete structures that according to the current code regulations have to be rehabilitated to increase their seismic capacity. One way to reduce the vulnerability of the bridges is by using retrofitting techniques that increase the strength of the structure or by incorporating devices to reduce the seismic demand. One of the most common retrofit techniques of the bridges substructures is the use of RC jacketing; this research assesses the expected damages of seismically deficient medium length highway bridges retrofitted with reinforced concrete jacketing, by conducting a parametric study. We select a suite of twenty accelerograms of subduction earthquakes recorded close to the Pacific Coast in Mexico. The original structures consist of five 30 m span simple supported bridges with five pier heights of 5 m, 10 m, 15 m 20 and 25 m and the analyses include three different jacket thickness and three steel ratios. The bridges were subjected to the seismic records and non-linear time history analyses were carried out by using the OpenSEEs Plataform. Results allow selecting the reinforced concrete jacketing that better improves the expected seismic behavior of the bridge models.

  13. CERN automatic audio-conference service

    NASA Astrophysics Data System (ADS)

    Sierra Moral, Rodrigo

    2010-04-01

    Scientists from all over the world need to collaborate with CERN on a daily basis. They must be able to communicate effectively on their joint projects at any time; as a result telephone conferences have become indispensable and widely used. Managed by 6 operators, CERN already has more than 20000 hours and 5700 audio-conferences per year. However, the traditional telephone based audio-conference system needed to be modernized in three ways. Firstly, to provide the participants with more autonomy in the organization of their conferences; secondly, to eliminate the constraints of manual intervention by operators; and thirdly, to integrate the audio-conferences into a collaborative working framework. The large number, and hence cost, of the conferences prohibited externalization and so the CERN telecommunications team drew up a specification to implement a new system. It was decided to use a new commercial collaborative audio-conference solution based on the SIP protocol. The system was tested as the first European pilot and several improvements (such as billing, security, redundancy...) were implemented based on CERN's recommendations. The new automatic conference system has been operational since the second half of 2006. It is very popular for the users and has doubled the number of conferences in the past two years.

  14. 76 FR 67725 - Technical Conference on Penalty Guidelines; Second Notice of Technical Conference on Penalty...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... Conference on Penalty Guidelines; Second Notice of Technical Conference on Penalty Guidelines On September 21... Conference on Penalty Guidelines to be held on November 17, 2011. The conference will be held from 1 p.m. to... impact of the Penalty Guidelines, which the Commission issued on September 17, 2010,\\1\\ on compliance and...

  15. Preface: Proceedings of the 11th International Conference on Magnetic Fluids (ICMF 11) (Košice, Slovakia, 23 27 July 2007)

    NASA Astrophysics Data System (ADS)

    Kopčanský, Peter; Timko, Milan; Kováč, Josef; Václavíková, Miroslava; Odenbach, Stefan

    2008-05-01

    The 11th International Conference on Magnetic Fluids (ICMF 11) was held in Košice, Slovakia between 23-27 July 2007. Attendance at the conference was high and its motivation was in line with the ten previous ICMF conferences organized in Udine, Orlando, Bangor, Sendai-Tokyo, Riga, Paris, Bhavnagar, Timisoara, Bremen and Guarujá. The conference in Slovakia reflected the scientific community's enthusiasm and worldwide support, with 256 participants, from 30 countries attending.The main objective of ICMF 11 was to promote progress and knowledge in the field of magnetic fluids regarding their chemistry, physical and magnetic properties, heat and mass transfer, surface phenomena, as well as their technological and biomedical applications. As research on magnetic fluids is essentially interdisciplinary, experts from related areas were invited to present their contributions with a view to increasing knowledge in the field and highlighting new trends. Submitted communications were refereed by members of the Scientific Organizing Committee and abstracts were assembled in a book of abstracts. Participants presented 180 posters in two poster sessions and 56 oral presentations. All presentations contributed to a greater understanding of the area, and helped to bridge the gap between physics, chemistry, technology, biology and medical sciences. Contributions to this conference are presented in 115 scientific papers, with some published in Journal of Physics: Condensed Matter and the rest in Magnetohydrodynamics. The organization of the conference was made possible by generous support from the Institute of Experimental Physics and Institute of Geotechnics of the Slovak Academy of Sciences, the University of Pavol Jozef Šafárik and the Slovak Physical Society. Financial support from Ferrotec, Cryosoft Ltd, Mikrochem, Liquids Research Ltd, Askony and US Steel Košice, is also gratefully acknowledged.

  16. PREFACE: XXV International Conference on Photonic, Electronic and Atomic Collisions

    NASA Astrophysics Data System (ADS)

    Becker, Uwe; Moshammer, Robert; Mokler, Paul; Ullrich, Joachim

    2007-07-01

    The XXVth ICPEAC in Freiburg marked a notable anniversary in collision physics: half a century ago the first conference in the series of International Conferences on the Physics of Electronic and Atomic Collisions (ICPEAC) was held in New York (1958). Since then, the development of electronic and atomic collision physics has seen tremendous progress. Starting during a time, when this field was regarded as somehow out-of-date, certainly not being in the main stream compared to particle and high-energy physics, it has expanded in a rather exceptional and unforeseen way. Over the years the original scope on electronic, atomic and heavy-ion collision physics was extended substantially to include upcoming expanding fields like synchrotron-radiation and strong-field laser-based atomic and molecular physics giving rise to a change of name to 'Photonic', Electronic and Atomic Collisions (ICPEAC) being used for the first time for the ICPEAC in Santa Fee in 2001. Nowadays, the ICPEAC has opened its agenda even more widely to other fields of atomic and molecular physics, such as interactions with clusters, bio-molecules and surfaces, to cold collisions, coherent control, femto- and attosecond physics and, with the Freiburg conference, to the application of free-electron lasers in the vacuum ultraviolet and soft x-ray regime, a field of potentially huge future impact in essentially all areas of science. In this larger context the XXVth ICPEAC in Freiburg with more than 800 participants set new standards. Representatives from all fields of Atomic, Molecular and Photon-based science came together and had very fruitful, inter-disciplinary discussions. This new forum of collision-based AMP physics will serve as a showcase example of future conferences, bridging not only the gap between different fields of collision physics but also, equally important, between different continents and cultures. The next ICPEAC is going to take place in Kalamazoo in North America, the one after that

  17. Post-Earthquake Traffic Capacity of Modern Bridges in California

    DOT National Transportation Integrated Search

    2010-03-01

    Evaluation of the capacity of a bridge to carry self-weight and traffic loads after an earthquake is essential for a : safe and timely re-opening of the bridge. In California, modern highway bridges designed using the Caltrans : Seismic Design Criter...

  18. Long-Term Bridge Performance (LTBP) Program Protocols, Version 1

    DOT National Transportation Integrated Search

    2016-01-01

    The Long-Term Bridge Performance (LTBP) Program is a long-term research effort to collect scientific performance data from a representative sample of bridges in the United States. Data will be collected for in-service bridges using a variety of techn...

  19. Evaluation of cracking of the US 331 bridge deck.

    DOT National Transportation Integrated Search

    2010-08-01

    The focus of this report is a three-span, continuous, skewed bridge that was constructed in the : summer of 2003 as the northbound roadway bridge on US 331 in Montgomery County, : Alabama. This bridge deck exhibited extensive transverse and horizonta...

  20. Long-term monitoring of the HPC Charenton Canal Bridge.

    DOT National Transportation Integrated Search

    2011-08-01

    The report contains long-term monitoring data collection and analysis of the first fully high : performance concrete (HPC) bridge in Louisiana, the Charenton Canal Bridge. The design of this : bridge started in 1997, and it was built and opened to tr...