Science.gov

Sample records for bus evaluation interim

  1. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities operating over-the-road buses, in addition to compliance with other applicable provisions of this...

  2. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. Link to an amendment published at 76 FR 57936, September 19, 2011. (a) Private entities operating over-the-road buses,...

  3. Analysis of the University of Texas at Austin compressed natural gas demonstration bus. Interim research report

    SciTech Connect

    Wu, C.M.; Matthews, R.; Euritt, M.

    1994-06-01

    A demonstration compressed natural gas (CNG) bus has been operating on The University of Texas at Austin shuttle system since 1992. This CNG vehicle, provided by the Blue Bird Company, was an opportunity for the University to evaluate the effectiveness of a CNG bus for shuttle operations. Three basic operating comparisons were made: (1) fuel consumption, (2) tire wear, and (3) vehicle performance. The bus was equipped with a data logger, which was downloaded regularly, for trip reports. Tire wear was monitored regularly, and performance tests were conducted at the Natural Gas Vehicle Technology Center. Overall, the data suggest that fuel costs for the CNG bus are comparable to those for University diesel buses. This is a result of the lower fuel price for natural gas. Actual natural gas fuel consumption was higher for the CNG buses than for the diesel buses. Due to weight differences, tire wear was much less on the CNG buses. Finally, after installation of a closed-loop system, the CNG bus out-performed the diesel bus on acceleration, grade climbing ability, and speed.

  4. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results

    SciTech Connect

    Chandler, K.; Eudy, L.

    2008-10-01

    This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.

  5. Systems evaluation of thermal bus concepts

    NASA Technical Reports Server (NTRS)

    Stalmach, D. D.

    1982-01-01

    Thermal bus concepts, to provide a centralized thermal utility for large, multihundred kilowatt space platforms, were studied and the results are summarized. Concepts were generated, defined, and screened for inclusion in system level thermal bus trades. Parametric trade studies were conducted in order to define the operational envelope, performance, and physical characteristics of each. Two concepts were selected as offering the most promise for thermal bus development. All of four concepts involved two phase flow in order to meet the required isothermal nature of the thermal bus. Two of the concepts employ a mechanical means to circulate the working fluid, a liquid pump in one case and a vapor compressor in another. Another concept utilizes direct osmosis as the driving force of the thermal bus. The fourth concept was a high capacity monogroove heat pipe. After preliminary sizing and screening, three of these concepts were selected to carry into the trade studies. The monogroove heat pipe concept was deemed unsuitable for further consideration because of its heat transport limitations. One additional concept utilizing capillary forces to drive the working fluid was added. Parametric system level trade studies were performed. Sizing and weight calculations were performed for thermal bus sizes ranging from 5 to 350 kW and operating temperatures in the range of 4 to 120 C. System level considerations such as heat rejection and electrical power penalties and interface temperature losses were included in the weight calculations.

  6. American Fuel Cell Bus Project Evaluation. Second Report

    SciTech Connect

    Eudy, Leslie; Post, Matthew

    2015-09-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.

  7. BC Transit Fuel Cell Bus Project: Evaluation Results Report

    SciTech Connect

    Eudy, L.; Post, M.

    2014-02-01

    This report evaluates a fuel cell electric bus demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. This evaluation report covers two years of revenue service data on the buses from April 2011 through March 2013.

  8. Safety evaluation of a hydrogen fueled transit bus

    SciTech Connect

    Coutts, D.A.; Thomas, J.K.; Hovis, G.L.; Wu, T.T.

    1997-12-31

    Hydrogen fueled vehicle demonstration projects must satisfy management and regulator safety expectations. This is often accomplished using hazard and safety analyses. Such an analysis has been completed to evaluate the safety of the H2Fuel bus to be operated in Augusta, Georgia. The evaluation methods and criteria used reflect the Department of Energy`s graded approach for qualifying and documenting nuclear and chemical facility safety. The work focused on the storage and distribution of hydrogen as the bus motor fuel with emphases on the technical and operational aspects of using metal hydride beds to store hydrogen. The safety evaluation demonstrated that the operation of the H2Fuel bus represents a moderate risk. This is the same risk level determined for operation of conventionally powered transit buses in the United States. By the same criteria, private passenger automobile travel in the United States is considered a high risk. The evaluation also identified several design and operational modifications that resulted in improved safety, operability, and reliability. The hazard assessment methodology used in this project has widespread applicability to other innovative operations and systems, and the techniques can serve as a template for other similar projects.

  9. The EMEFS model evaluation. An interim report

    SciTech Connect

    Barchet, W.R.; Dennis, R.L.; Seilkop, S.K.; Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K.; Byun, D.; McHenry, J.N.; Karamchandani, P.; Venkatram, A.; Fung, C.; Misra, P.K.; Hansen, D.A.; Chang, J.S.

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  10. BC Transit Fuel Cell Bus Project Evaluation Results: Second Report

    SciTech Connect

    Eudy, L.; Post, M.

    2014-09-01

    Second report evaluating a fuel cell electric bus (FCEB) demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. NREL published its first report on the demonstration in February 2014. This report is an update to the previous report; it covers 3 full years of revenue service data on the buses from April 2011 through March 2014 and focuses on the final experiences and lessons learned.

  11. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: First Results Report

    SciTech Connect

    Eudy, L.; Chandler, K.

    2011-03-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This report provides the early data results and implementation experience of the AT fuel cell bus since it was placed in service.

  12. TWRS HLW interim storage facility search and evaluation

    SciTech Connect

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  13. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Third Results Reports

    SciTech Connect

    Eudy, L.; Chandler, K.

    2012-05-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. NREL has previously published two reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from July 2011 through January 2012.

  14. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report

    SciTech Connect

    Eudy, L.; Chandler, K.

    2013-01-01

    SunLine Transit Agency, which provides public transit services to the Coachella Valley area of California, has demonstrated hydrogen and fuel cell bus technologies for more than 10 years. In May 2010, SunLine began demonstrating the advanced technology (AT) fuel cell bus with a hybrid electric propulsion system, fuel cell power system, and lithium-based hybrid batteries. This report describes operations at SunLine for the AT fuel cell bus and five compressed natural gas buses. The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) is working with SunLine to evaluate the bus in real-world service to document the results and help determine the progress toward technology readiness. NREL has previously published three reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from February 2012 through November 2012.

  15. Testing and Evaluation of Batteries for a Fuel Cell Powered Hybrid Bus

    SciTech Connect

    Miller, J.F.; Webster, C.E.; Tummillo, A.F.; DeLuca, W.H.

    1997-05-01

    Argonne National Laboratory conducted performance characterization and life-cycle tests on various batteries to qualify them for use in a fuel cell/battery hybrid bus. On this bus, methanol-fueled, phosphoric acid fuel cells provide routine power needs, while batteries are used to store energy recovered during bus braking and to produce short-duration power during acceleration. Argonne carried out evaluation and endurance testing on several lead-acid and nickel/cadmium batteries selected by the bus developer as potential candidates for the bus application. Argonne conducted over 10,000 hours of testing, simulating more than 80,000 miles of fuel cell bus operation, for the nickel/cadmium battery, which was ultimately selected for use in the three hybrid buses built under the direction of H-Power Corp.

  16. Interim Evaluation of the National Literacy Program. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Social Development Canada, 2007

    2007-01-01

    The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…

  17. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Second Results Report and Appendices

    SciTech Connect

    Eudy, L.; Chandler, K.

    2011-10-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This is the second results report for the AT fuel cell bus since it was placed in service, and it focuses on the newest data analysis and lessons learned since the previous report. The appendices, referenced in the main report, provide the full background for the evaluation. They will be updated as new information is collected but will contain the original background material from the first report.

  18. Development of a rotary engine powered APU for a medium duty hybrid shuttle bus. Interim report July 1995--July 1996

    SciTech Connect

    McBroom, S.T.

    1998-07-01

    Under contract to the TARDEC Petroleum and Water Business Area, sponsored by the Defense Advanced Research Projects Agency, SwRI has procured and installed a rotary Auxiliary Power Unit on a medium-duty series hybrid electric bus. This report covers the specification and distillation of the APU and the lessons learned from those efforts.

  19. Interim reliability evaluation program, Browns Ferry fault trees

    SciTech Connect

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.

  20. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Third Evaluation Report and Appendices

    SciTech Connect

    Chandler, K.; Eudy, L.

    2010-01-01

    This report describes operations at Connecticut Transit (CTTRANSIT) in Hartford for one prototype fuel cell bus and three new diesel buses operating from the same location. The prototype fuel cell bus was manufactured by Van Hool and ISE Corp. and features an electric hybrid drive system with a UTC Power PureMotion 120 Fuel Cell Power System and ZEBRA batteries for energy storage. The fuel cell bus started operation in April 2007, and evaluation results through October 2009 are provided in this report.

  1. Evaluation of hardness and wear resistance of interim restorative materials

    PubMed Central

    Savabi, Omid; Nejatidanesh, Farahnaz; Fathi, Mohamad Hossein; Navabi, Amir Arsalan; Savabi, Ghazal

    2013-01-01

    Background: The interim restorative materials should have certain mechanical properties to withstand in oral cavity. The aim of this study was to evaluate the hardness and wear resistance of interim restorative materials. Materials and Methods: Fifteen identical rectangular shape specimens with dimensions of 2 mm × 10 mm × 30 mm were made from 7 interim materials (TempSpan, Protemp 3 Garant, Revotek, Unifast LC, Tempron, Duralay, and Acropars). The Vickers hardness and abrasive wear of specimens were tested in dry conditions and after 1 week storage in artificial saliva. The depth of wear was measured using surface roughness inspection device. Data were subjected to Kruskal–Wallis and Mann–Whitney tests. The Pearson correlation coefficient was used to determine the relationship between hardness and wear (α =0.05). Results: TempSpan had the highest hardness. The wear resistance of TempSpan (in dry condition) and Revotek (after conditioning in artificial saliva) was significantly higher (P < 0.05). There was no statistically significant correlation between degree of wear and hardness of the materials (P = 0.281, r = −0.31). Conclusion: Hardness and wear resistance of interim resins are material related rather than category specified. PMID:23946734

  2. An evaluation plan of bus architectures and protocols using the NASA Ames intelligent redundant actuation system

    NASA Technical Reports Server (NTRS)

    Defeo, P.; Chen, M.

    1987-01-01

    Means for evaluating data bus architectures and protocols for highly integrated flight control system applications are needed. Described are the criteria and plans to do this by using the NASA/Ames Intelligent Redundant Actuation System (IRAS) experimental set-up. Candidate bus architectures differ from one another in terms of: topology, access control, message transfer schemes, message characteristics, initialization. data flow control, transmission rates, fault tolerance, and time synchronization. The evaluation criteria are developed relative to these features. A preliminary, analytical evaluation of four candidate busses (MIL-STD-1553B, DATAC, Ethernet, and HSIS) is described. A bus must be exercised in a real-time environment to evaluate its dynamic characteristics. A plan for real-time evaluation of these four busses using a combination of hardware and simulation techniques is presented.

  3. SEF - Academic Evaluation. An Interim Report.

    ERIC Educational Resources Information Center

    Metropolitan Toronto School Board (Ontario). Study of Educational Facilities.

    This report is the result of the first year evaluation of 16 open plan schools built by SEF, four NonSEF open plan schools, and four traditional plan schools in an effort to compare SEF schools with nonSEF schools and open plan facilities with traditional plan facilities. The study was intended to gather information about the adequacy of these…

  4. SunLine Transit Agency Fuel Cell Transit Bus: Fourth Evaluation Report (Report and Appendices)

    SciTech Connect

    Chandler, K.; Eudy, L.

    2009-01-01

    This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five new compressed natural gas (CNG) buses. This is the fourth evaluation report for this site, and it describes results and experiences from April 2008 through October 2008. These results are an addition to those provided in the previous three evaluation reports.

  5. SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report (Report and Appendices)

    SciTech Connect

    Eudy, L.; Chandler, K.

    2009-08-01

    This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five compressed natural gas (CNG) buses. This is the fifth evaluation report for this site, and it describes results and experiences from October 2008 through June 2009. These results are an addition to those provided in the previous four evaluation reports.

  6. A new vehicle data bus architecture and IVIS evaluation platform for ITS modulus

    SciTech Connect

    Spelt, P.F.; Kirson, A.M.; Scott, S.

    1998-12-31

    An increasing number of ITS-related after-market systems present a set of in-vehicle installation and use problems relatively unique in the history of automobile use. Many automobile manufacturers would like to offer these new state of the art devices to customers, but are hampered by the current design cycle of new cars. While auto manufacturers are indeed using multiplex buses (the automotive equivalent of a computer local area network), problems remain because manufacturers are not converging on a single bus standard. This paper presents a new dual-bus architecture to address these problems, with an In-Vehicle Information System (IVIS) research platform on which the principles embodied in the ITS Data Bus architecture can be evaluated. The dual-bus architecture has been embodied in a proposed SAE standard, with a ratification vote in December, 1996. The architecture and a reference model for the interfaces and protocols of the new bus are presented and described. The goals of the ITS Data Bus are to be inexpensive and easy to install, and to provide for safe and secure functioning. These high-level goals are embodied in the proposed standard. The IVIS Development Platform comprises a number of personal computers linked via ethernet LAN, with a high-end PC serving as the IVIS computer. In this LAN, actual devices can be inserted in place of the original PC which emulated them. This platform will serve as the development and test bed for an ITS Data Bus Conformity Test, the SAE standard for which has also been developed.

  7. Performance evaluation of the JPL interim digital SAR processor

    NASA Technical Reports Server (NTRS)

    Wu, C.; Barkan, B.; Curlander, J.; Jin, M.; Pang, S.

    1983-01-01

    The performance of the Interim Digital SAR Processor (IDP) was evaluated. The IDP processor was originally developed for experimental processing of digital SEASAT SAR data. One phase of the system upgrade which features parallel processing in three peripheral array processors, automated estimation for Doppler parameters, and unsupervised image pixel location determination and registration was executed. The method to compensate for the target range curvature effect was improved. A four point interpolation scheme is implemented to replace the nearest neighbor scheme used in the original IDP. The processor still maintains its fast throughput speed. The current performance and capability of the processing modes now available on the IDP system are updated.

  8. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  9. Pilot Evaluation of a Walking School Bus Program in a Low-Income Urban Community

    Technology Transfer Automated Retrieval System (TEKTRAN)

    To evaluate the impact of a walking school bus (WSB) program on the proportion of students walking to school in a low-income, urban neighborhood, we conducted a controlled, quasi-experimental trial in urban, socioeconomically disadvantaged, public elementary schools (one intervention and two control...

  10. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Second Evaluation Report and Appendices

    SciTech Connect

    Chandler, K.; Eudy, L.

    2009-05-01

    This report describes operations at Connecticut Transit (CTTRANSIT) in Hartford for one prototype fuel cell bus and three new diesel buses operating from the same location. The evaluation period in this report (January 2008 through February 2009) has been chosen to coincide with a UTC Power propulsion system changeout that occurred on January 15, 2008.

  11. Pilot evaluation of a walking school bus program in a low-income, urban community

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Our objective was to evaluate the impact of a walking school bus (WSB) program on student transport in a low-income, urban neighborhood. The design was a controlled, quasi-experimental trial with consecutive cross-sectional assessments. The setting was three urban, socioeconomically disadvantaged, p...

  12. Performance Evaluation of UHF RFID Technologies for Real-Time Bus Recognition in the Taipei Bus Station

    PubMed Central

    Own, Chung-Ming; Lee, Da-Sheng; Wang, Ti-Ho; Wang, De-Jun; Ting, Yu-Lun

    2013-01-01

    Transport stations such as airports, ports, and railways have adopted blocked-type pathway management to process and control travel systems in a one-directional manner. However, this excludes highway transportation where large buses have great variability and mobility; thus, an instant influx of numerous buses increases risks and complicates station management. Focusing on Taipei Bus Station, this study employed RFID technology to develop a system platform integrated with modern information technology that has numerous characteristics. This modern information technology comprised the following systems: ultra-high frequency (UHF) radio-frequency identification (RFID), ultrasound and license number identification, and backstage graphic controls. In conclusion, the system enabled management, bus companies, and passengers to experience the national bus station's new generation technology, which provides diverse information and synchronization functions. Furthermore, this technology reached a new milestone in the energy-saving and efficiency-increasing performance of Taiwan's buses. PMID:23778192

  13. ICPP radioactive liquid and calcine waste technologies evaluation. Interim report

    SciTech Connect

    Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

    1994-06-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

  14. Evaluation and Research Center for Project Head Start, University of South Carolina. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Friedman, Myles I.

    This document is an interim evaluation report of language development curriculums in full year Head Start programs operating in the five state area the Research and Evaluation Center serves. One experimental study in language development carried on in cooperation with the Texas and Tulane centers is reported in depth. The study was implemented in…

  15. St. Louis Metro Biodiesel (B20) Transit Bus Evaluation: 12-Month Final Report

    SciTech Connect

    Barnitt, R.; McCormick, R. L.; Lammert, M.

    2008-07-01

    The St. Louis Metro Bodiesel Transit Bus Evaluation project is being conducted under a Cooperative Research and Development Agreement between NREL and the National Biodiesel Board to evaluate the extended in-use performance of buses operating on B20 fuel. The objective of this research project is to compare B20 and ultra-low sulfur diesel buses in terms of fuel economy, veicles maintenance, engine performance, component wear, and lube oil performance.

  16. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report and Appendices, Alameda-Contra Costa Transit District (AC Transit)

    SciTech Connect

    Chandler, K.; Eudy, L.

    2009-01-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).

  17. Update from the NREL Alternative Fuel Transit Bus Evaluation Program

    SciTech Connect

    Chandler, K.; Norton, P.; Clark, N.

    1999-05-01

    The object of this project, which is supported by the U.S. Department of Energy (DOE) through the National Renewable Energy Laboratory (NREL), is to provide a comprehensive comparison of heavy-duty urban transit buses operating on alternative fuels and diesel fuel. Final reports from this project were produced in 1996 from data collection and evaluation of 11 transit buses from eight transit sites. With the publication of these final reports, three issues were raised that needed further investigation: (1) the natural gas engines studied were older, open-loop control engines; (2) propane was not included in the original study; and (3) liquefied natural gas (LNG) was found to be in the early stages of deployment in transit applications. In response to these three issues, the project has continued by emissions testing newer natural gas engines and adding two new data collection sites to study the newer natural gas technology and specifically to measure new technology LNG buses.

  18. Research development and demonstration of a fuel cell/battery powered bus system. Interim report, August 1, 1991--April 30, 1992

    SciTech Connect

    Romano, S.; Wimmer, R.

    1992-04-30

    This report describes the progress in the Georgetown University research, development and demonstration project of a fuel cell/battery powered bus system. The topics addressed in the report include vehicle design and application analysis, technology transfer activities, coordination and monitoring of system design and integration contractor, application of fuel cells to other vehicles, current problems, work planned, and manpower, cost and schedule reports.

  19. Hydrogen and Fuel Cell Transit Bus Evaluations: Joint Evaluation Plan for the U.S. Department of Energy and the Federal Transit Administration (Report and Appendix)

    SciTech Connect

    Eudy, L.; Chandler, K.

    2008-05-01

    This document describes the hydrogen transit bus evaluations performed by the National Renewable Energy Laboratory (NREL) and funded by the U.S. Department of Energy (DOE) and the U.S. Department of Transportation's Federal Transit Administration (FTA).

  20. Fuel Cell Transit Bus Evaluations: Joint Evaluation Plan for the U.S. Department of Energy and the Federal Transit Administration (Report and Appendix)

    SciTech Connect

    Eudy, L.; Chandler, K.

    2010-11-01

    This document describes the fuel cell transit bus evaluations performed by the National Renewable Energy Laboratory (NREL) and funded by the U.S. Department of Energy (DOE) and the U.S. Department of Transportation's Federal Transit Administration (FTA). This document provides a description of the demonstration sites, funding sources, and data collection activities for fuel cell transit bus evaluations currently planned from FY10 through FY12.

  1. Evaluation of the ERA Interim surface winds over the Tropical Pacific

    NASA Astrophysics Data System (ADS)

    de Boisseson, Eric; Balmaseda, Magdalena

    2014-05-01

    Over the past 20 years, the ERA Interim reanalysis has been showing a strengthening of the trade winds in the tropical Pacific Ocean. Literature has shown that atmospheric reanalyses can present spurious signals due to changes in the observing system. ERA Interim has been assimilating various wind products over the past 30 years. Evaluating how robust are the changes in ERA Interim tropical winds is thus necessary. Comparisons with scatterometer winds, in situ observations, a satellite-free ECMWF reanalysis and an AMIP integration are conducted. The climate signal observed in ERA Interim from the early 1990s to 2013 is in agreement with both scatterometer winds and in situ wind observations from the TAO array. Comparisons to the ERA20C reanalysis that does not assimilate satellite winds are also very positive. A similar strengthening of the tropical surface winds is detected in the ERA20CM AMIP integration thus discarding any impact from the assimilation of other variables. These positive results strongly suggest that the signal detected in ERA Interim reflects an actual climate shift in the tropical Pacific winds.

  2. An Inter-Disciplinary Problem Solving Approach to Environmental Education, Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Egan, Thomas A.; Seidel, Janet C.

    Evaluation of an ESEA Title III project, "An Inter-Disciplinary Problem Solving Approach to Environmental Education" located in Berks County, Pennsylvania, is offered in this interim report. The report is primarily concerned with the degree to which operational and management process objectives are being achieved in each of four components:…

  3. AN EVALUATION OF THE HUMAN CARCINOGENIC POTENTIAL OF ETHYLENE GLYCOL BUTYL ETHER: INTERIM FINAL POSITION PAPER

    EPA Science Inventory

    In order to determine the merit of a petition to remove ethylene glycol ether (EGBE) from the Agency's Hazardous Air Pollutant (HAP) list, EPA has developed an interim final position paper, An Evaluation of the Human Carcinogenic Potential of Ethylene Glycol Butyl Ether, t...

  4. The Evaluation of Abstinence Education Programs Funded Under Title V Section 510: Interim Report.

    ERIC Educational Resources Information Center

    Devaney, Barbara; Johnson, Amy; Maynard, Rebecca; Trenholm, Chris

    This report presents interim findings from an independent, federally funded evaluation of the abstinence education programs authorized under the Personal Responsibility and Work Opportunity Reconciliation Act (PRWORA) and defined under Title V, Section 510 (b)(2)(A-H) of the Social Security Act. The report draws heavily on 4 years of…

  5. An Evaluation of the Individual Training Account/Eligible Training Provider Demonstration. Final Interim Report.

    ERIC Educational Resources Information Center

    D'Amico, Ronald; Martinez, Alexandria; Salzman, Jeffrey; Wagner, Robin

    In March 2000, thirteen grants were awarded as part of the Individual Training Account/Eligible Training Provider (ITA/ETP) Demonstration. In summer and fall of 2000, the grant recipients' activities were subjected to an interim evaluation. Site visits were made to each grantee to determine what ITA policies and practices were being formulated,…

  6. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  7. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report #2, Alameda-Contra Costa Transit District (AC Transit) and Appendices

    SciTech Connect

    Eudy, L.; Chandler, K.

    2010-06-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006, comparing similar diesel buses operating from the same depot. It covers November 2007 through February 2010. Results include implementation experience, fueling station operation, evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and road calls), and a summary of achievements and challenges encountered during the demonstration.

  8. FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report

    SciTech Connect

    Barnitt, R.

    2010-05-01

    This interim report presents partial (six months) results for a technology evaluation of gasoline hybrid electric parcel delivery trucks operated by FedEx in and around Los Angeles, CA. A 12 month in-use technology evaluation comparing in-use fuel economy and maintenance costs of GHEVs and comparative diesel parcel delivery trucks was started in April 2009. Comparison data was collected and analyzed for in-use fuel economy and fuel costs, maintenance costs, total operating costs, and vehicle uptime. In addition, this interim report presents results of parcel delivery drive cycle collection and analysis activities as well as emissions and fuel economy results of chassis dynamometer testing of a gHEV and a comparative diesel truck at the National Renewable Energy Laboratory's (NREL) ReFUEL laboratory. A final report will be issued when 12 months of in-use data have been collected and analyzed.

  9. Weatherization Works: An interim report of the National Weatherization Evaluation

    SciTech Connect

    Brown, M.A.; Berry, L.G.; Kinney, L.F.

    1993-11-01

    The National Weatherization Evaluation is the first comprehensive evaluation of the Weatherization Assistance Program since 1984. The evaluation was designed to accomplish the following goals: Estimate energy savings and cost effectiveness; Assess nonenergy impacts; Describe the weatherization network; Characterize the eligible population and resources; and Identify factors influencing outcomes and opportunities for the future. As a national program, weatherization incorporates considerable diversity due to regional differences. Therefore, evaluation results are presented both in aggregate and for three climate regions: cold, moderate and hot.

  10. Evaluation Pilot Advisory Committee (EPAC) Interim Report, 2011-2012

    ERIC Educational Resources Information Center

    New Jersey Department of Education, 2012

    2012-01-01

    New Jersey is preparing to implement a statewide educator evaluation system in the 2013-14 school year. As part of this process, an Evaluation Pilot Advisory Committee (EPAC) was convened in September 2011. The EPAC consisted of 22 appointed members from various stakeholder groups. Its charge was to make recommendations to the New Jersey…

  11. Evaluation of In Harmony: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Lord, Pippa; Sharp, Caroline; Dawson, Anneka; Mehta, Palak; White, Richard; Jeffes, Jennifer

    2013-01-01

    Arts Council England (ACE) commissioned NFER to undertake the national evaluation of the In Harmony social and music education programme 2012-2015. In Harmony is funded by the Department for Education (DfE) and ACE, and is currently being piloted in six areas. The evaluation is investigating the range and extent of impacts on children, families,…

  12. STARPAHC Interim Evaluation Report, May 1975 - April 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The primary goals of the STARPAHC Program are to provide data for developing health care for future manned spacecraft, and to establish the feasibility of the STARPAHC concept for improving the delivery of health care to remote areas on earth. Accordingly, the hardware and medical evaluations initiated during the first 6 months of system operation were continued and expanded during the second 6-month period. The evaluations are based on what has proven to be a relatively stabilized 6-month period wherein system failures which occurred during the initial shakedown period in the first 6 months have been minimized. Early trends and performance data reported in the first semi-annual report were reexamined to either verify, modify or change earlier conclusions. The highlights are given of the total year of operation with emphasis on comparisons between the first and second semi-annual reporting period. In addition, an early analysis of costs is summarized.

  13. Interim Principals.

    ERIC Educational Resources Information Center

    Beem, Kate

    2003-01-01

    An interim principal can buy a school district time to land a permanent successor. Also lists where to find an interim principal; the interim's steadying influence; Bob Wallace's wild ride as an interim principal in post-retirement; and Roger Prosise's rationale for turning to an interim appointment. (MLF)

  14. Improving School Bus Driver Performance.

    ERIC Educational Resources Information Center

    Farmer, Ernest

    This reference source is intended to assist the school bus driver training instructor in course preparation. Instructional units for program planning each contain pertinent course questions, a summary, and evaluation questions. Unit 1, "Introduction to the School Bus Driver Training Program," focuses on basic course objectives and requirements and…

  15. Whole-body Vibration Exposure Intervention among Professional Bus and Truck Drivers: A Laboratory Evaluation of Seat-suspension Designs.

    PubMed

    Blood, Ryan P; Yost, Michael G; Camp, Janice E; Ching, Randal P

    2015-01-01

    Long-term exposure to seated whole-body vibration (WBV) is one of the leading risk factors for the development of low back disorders. Professional bus and truck drivers are regularly exposed to continuous WBV, since they spend the majority of their working hours driving heavy vehicles. This study measured WBV exposures among professional bus and truck drivers and evaluated the effects of seat-suspension designs using simulated field-collected data on a vibration table. WBV exposures were measured and compared across three different seat designs: an air-ride bus seat, an air-ride truck seat, and an electromagnetically active (EM-active) seat. Air-ride seats use a compressed-air bladder to attenuate vibrations, and they have been in operation throughout the transportation industry for many years. The EM-active seat is a relatively new design that incorporates a microprocessor-controlled actuator to dampen vibration. The vibration table simulated seven WBV exposure scenarios: four segments of vertical vibration and three scenarios that used field-collected driving data on different road surfaces-a city street, a freeway, and a section of rough roadway. The field scenarios used tri-axial WBV data that had been collected at the seat pan and at the driver's sternum, in accordance with ISO 2631-1 and 2631-5. This study found that WBV was significantly greater in the vertical direction (z-axis) than in the lateral directions (x-and y-axes) for each of the three road types and each of the three types of seats. Quantitative comparisons of the results showed that the floor-to-seat-pan transmissibility was significantly lower for the EM-active seat than for either the air-ride bus seat or the air-ride truck seat, across all three road types. This study also demonstrated that seat-suspension designs have a significant effect on the vibrations transmitted to vehicle operators, and the study's results may prove useful in designing future seat suspensions. PMID:25625530

  16. Interim radiological safety standards and evaluation procedures for subseabed high-level waste disposal

    SciTech Connect

    Klett, R.D.

    1997-06-01

    The Seabed Disposal Project (SDP) was evaluating the technical feasibility of high-level nuclear waste disposal in deep ocean sediments. Working standards were needed for risk assessments, evaluation of alternative designs, sensitivity studies, and conceptual design guidelines. This report completes a three part program to develop radiological standards for the feasibility phase of the SDP. The characteristics of subseabed disposal and how they affect the selection of standards are discussed. General radiological protection standards are reviewed, along with some new methods, and a systematic approach to developing standards is presented. The selected interim radiological standards for the SDP and the reasons for their selection are given. These standards have no legal or regulatory status and will be replaced or modified by regulatory agencies if subseabed disposal is implemented. 56 refs., 29 figs., 15 tabs.

  17. 76 FR 72006 - Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... COMMISSION Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon... Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance with 10 CFR 20... that existing guidance does not sufficiently detail how the NRC staff reviews surveys of radon...

  18. Evaluation of 2004 Toyota Prius Hybrid Electric Drive System Interim Report

    SciTech Connect

    Ayers, C.W.

    2004-11-23

    Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

  19. Evaluation of emission toxicity of urban bus engines: compressed natural gas and comparison with liquid fuels.

    PubMed

    Turrio-Baldassarri, Luigi; Battistelli, Chiara Laura; Conti, Luigi; Crebelli, Riccardo; De Berardis, Barbara; Iamiceli, Anna Laura; Gambino, Michele; Iannaccone, Sabato

    2006-02-15

    Emissions from a spark-ignition (SI) heavy-duty (HD) urban bus engine with a three-way catalyst (TWC), fuelled with compressed natural gas (CNG), were chemically analyzed and tested for genotoxicity. The results were compared with those obtained in a previous study on an equivalent diesel engine, fuelled with diesel oil (D) and a blend of the same with 20% vegetable oil (B20). Experimental procedures were identical, so that emission levels of the CNG engine were exactly comparable to the ones of the diesel engine. The experimental design was focused on carcinogenic compounds and genotoxic activity of exhausts. The results obtained show that the SI CNG engine emissions, with respect to the diesel engine fuelled with D, were nearly 50 times lower for carcinogenic polycyclic aromatic hydrocarbons (PAHs), 20 times lower for formaldehyde, and more than 30 times lower for particulate matter (PM). A 20-30 fold reduction of genotoxic activity was estimated from tests performed. A very high reduction of nitrogen oxides (NO(X)) was also measured. The impact of diesel powered transport on urban air quality, and the potential benefits deriving from the use of CNG for public transport, are discussed. PMID:16442433

  20. Evaluating a GPS-Based Transportation Device to Support Independent Bus Travel by People with Intellectual Disability

    ERIC Educational Resources Information Center

    Davies, Daniel K.; Stock, Steven E.; Holloway, Shane; Wehmeyer, Michael L.

    2010-01-01

    We examined the utility of a PDA-based software system with integrated GPS technology for providing location-aware visual and auditory prompts to enable people with intellectual disability to successfully navigate a downtown bus route. Participants using the system were significantly more successful at completing a bus route than were people in a…

  1. Evaluation of Estrogenic Potential of Flavonoids Using a Recombinant Yeast Strain and MCF7/BUS Cell Proliferation Assay

    PubMed Central

    Resende, Flávia A.; de Oliveira, Ana Paula S.; de Camargo, Mariana S.; Vilegas, Wagner; Varanda, Eliana A.

    2013-01-01

    Phytoestrogens are of interest because of their reported beneficial effects on many human maladies including cancer, neurodegeneration, cardiovascular disease and diabetes. Furthermore, there is a search for compounds with estrogenic activity that can replace estrogen in hormone replacement therapy during menopause, without the undesirable effects of estrogen, such as the elevation of breast cancer occurrence. Thus, the principal objective of this study was to assess the estrogenic activity of flavonoids with different hydroxylation patterns: quercetin, kaempferol, luteolin, fisetin, chrysin, galangin, flavone, 3-hydroxyflavone, 5-hydroxyflavone and 7-hydroxyflavone via two different in vitro assays, the recombinant yeast assay (RYA) and the MCF-7 proliferation assay (E-screen), since the most potent phytoestrogens are members of the flavonoid family. In these assays, kaempferol was the only compound that showed ERα-dependent transcriptional activation activity by RYA, showing 6.74±1.7 nM EEQ, besides acting as a full agonist for the stimulation of proliferation of MCF-7/BUS cells. The other compounds did not show detectable levels of interaction with ER under the conditions used in the RYA. However, in the E-screen assay, compounds such as galangin, luteolin and fisetin also stimulated the proliferation of MCF-7/BUS cells, acting as partial agonists. In the evaluation of antiestrogenicity, the compounds quercetin, chrysin and 3-hydroxyflavone significantly inhibited the cell proliferation induced by 17-β-estradiol in the E-screen assay, indicating that these compounds may act as estrogen receptor antagonists. Overall, it became clear in the assay results that the estrogenic activity of flavonoids was affected by small structural differences such as the number of hydroxyl groups, especially those on the B ring of the flavonoid. PMID:24098354

  2. TMS communications software. Volume 2: Bus interface unit

    NASA Technical Reports Server (NTRS)

    Gregor, P. J.

    1979-01-01

    A data bus communication system to support the space shuttle's Trend Monitoring System (TMS) and to provide a basis for evaluation of the bus concept is described. Installation of the system included developing both hardware and software interfaces between the bus and the specific TMS computers and terminals. The software written for the microprocessor-based bus interface units is described. The software implements both the general bus communications protocol and also the specific interface protocols for the TMS computers and terminals.

  3. Analysis and simulation of a city bus route

    NASA Astrophysics Data System (ADS)

    Kar, Leow Soo

    2014-12-01

    Public transport in crowded cities, in particular bus services play an essential role in the mobility of its citizenry. However, an efficient, reliable and safe bus system is still a distant dream of many cities. This paper uses a simulation approach to provide some insight into the factors that contribute to the service quality of a bus system. SAS Simulation Studio is used to model a city bus route. The simulation model consists of a bus depot, bus stops, terminal station and a bus route. Parameters used in the simulation include the number of buses serving the route, maximum bus capacity, inter departure time of buses, travel time between stops, number of passengers boarding and alighting. The simulation is applied to a real bus route in Kuala Lumpur city center and a sensitivity analysis is performed to evaluate how the different variables affect the service quality of the bus system.

  4. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  5. Bus Training Handbook.

    ERIC Educational Resources Information Center

    Dorny, Audrea; Cole, ChiKay

    This manual presents guidelines for teaching students with disabilities necessary skills for safe and independent travel on public buses. Six guidelines for teachers include: (1) participate in bus training; (2) use wise and intelligent judgment; (3) utilize the bus checklist; (4) know and teach bus rules; (5) know bus routes; and (6) know bus…

  6. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    SciTech Connect

    Stahl, S.M.

    1994-12-30

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts.

  7. The Bus Stops Here.

    ERIC Educational Resources Information Center

    Milshtein, Amy

    1999-01-01

    Explores some of the factors to consider before school planners decide to buy new school buses. Provides a checklist to help build and maintain a bus fleet. Concludes by addressing bus safety and advertising. (GR)

  8. Evaluation of 2004 Toyota Prius Hybrid Electic Drive System Interim Report - Revised

    SciTech Connect

    Ayers, C.W.; Hsu, J.S.; Marlino, L.D.; Miller, C.W.; Ott, G.W., Jr.; Oland, C.B.; Burress, T.A.

    2007-07-31

    The 2004 Toyota Prius is a hybrid automobile equipped with a gasoline engine and a battery-powered electric motor. Both of these motive power sources are capable of providing mechanical drive power for the vehicle. The engine can deliver a peak power output of 57 kilowatts (kW) at 5000 revolutions per minute (rpm) while the motor can deliver a peak power output of 50 kW at 1300 rpm. Together, this engine-motor combination has a specified peak power output of 82 kW at a vehicle speed of 85 kilometers per hour (km/h). In operation, the 2004 Prius exhibits superior fuel economy compared to conventionally powered automobiles. Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

  9. Road safety issues for bus transport management.

    PubMed

    Cafiso, Salvatore; Di Graziano, Alessandro; Pappalardo, Giuseppina

    2013-11-01

    Because of the low percentage of crashes involving buses and the assumption that public transport improves road safety by reducing vehicular traffic, public interest in bus safety is not as great as that in the safety of other types of vehicles. It is possible that less attention is paid to the significance of crashes involving buses because the safety level of bus systems is considered to be adequate. The purpose of this study was to evaluate the knowledge and perceptions of bus managers with respect to safety issues and the potential effectiveness of various technologies in achieving higher safety standards. Bus managers were asked to give their opinions on safety issues related to drivers (training, skills, performance evaluation and behaviour), vehicles (maintenance and advanced devices) and roads (road and traffic safety issues) in response to a research survey. Kendall's algorithm was used to evaluate the level of concordance. The results showed that the majority of the proposed items were considered to have great potential for improving bus safety. The data indicated that in the experience of the participants, passenger unloading and pedestrians crossing near bus stops are the most dangerous actions with respect to vulnerable users. The final results of the investigation showed that start inhibition, automatic door opening, and the materials and internal architecture of buses were considered the items most strongly related to bus passenger safety. Brake assistance and vehicle monitoring systems were also considered to be very effective. With the exception of driver assistance systems for passenger and pedestrian safety, the perceptions of the importance of other driver assistance systems for vehicle monitoring and bus safety were not unanimous among the bus company managers who participated in this survey. The study results showed that the introduction of new technologies is perceived as an important factor in improving bus safety, but a better understanding

  10. Safety evaluation for the interim stabilization of Tank 241-C-103

    SciTech Connect

    Geschke, G.R.

    1995-03-01

    This document provides the basis for interim stabilization of tank 241-C-103. The document covers the removal of the organic liquid layer and the aqueous supernatant from tank 241-C-103. Hazards are identified, consequences are calculated and controls to mitigate or prevent potential accidents are developed.

  11. Values, Valuing, and Evaluation. Research on Evaluation Program, Paper and Report Series. Interim Draft.

    ERIC Educational Resources Information Center

    Gephart, William J.

    The paper discusses the meaning of value and valuing, their roles in evaluation, and the potency of value systems in problem solving logic. Evaluation is defined as a process for facilitating decision making. A decision making situation occurs when there are options which are impossible to treat equivalently, and there is an impact in the…

  12. Computer-assisted school bus routing and scheduling optimization. An evaluation of potential fuel savings and implementation alternatives

    SciTech Connect

    McCoy, G.A.; Mandlebaum, R.

    1985-11-01

    School Bus Routing and Scheduling Optimization (SBRSO) systems can substantially reduce school bus fleet operating costs. Fuel savings in excess of 450,000 gallons per year are achievable and a 10% decrease in route miles is attainable given computerized or computer-assisted SBRSO system use by the 32 Washington school districts operating bus fleets of at least 30 vehicles. Additional annual savings in excess of $3 million are possible assuming an 8% reduction in bus fleet size is made possible due to routing efficiency improvements. Three computerized SBRSO programs are examined, differing in the degree of state involvement and level of decentralization. We recommend the Washington State Energy Office (WSEO) acquire available low cost public domain SBRSO systems, convert the software to IBM and DEC compatibility, and demonstrate the software capabilities with at least one school district fleet. The most acceptable SBRSO system would then be disseminated and training offered to interested school districts, Educational Service Districts, and the Superintendent of Public Instruction's regional pupil transportation coordinators. If the existing public domain SBRSO systems prove unsatisfactory, or suitable only for rural districts, we recommend that the WSEO allocate oil company rebate monies for the development of a suitable SBRSO system. Training workshops would then be held when the SBRSO software was completed.

  13. Information management advanced development. Volume 3: Digital data bus breadboard

    NASA Technical Reports Server (NTRS)

    Gerber, C. R.

    1972-01-01

    The design, development, and evaluation of the digital data bus breadboard for the modular space station are discussed. Subjects presented are: (1) requirements summary, (2) parametric data for bus design, (3) redundancy concepts, and (4) data bus breadboard performance and interface requirements.

  14. Analysis of a diesel-electric hybrid urban bus system

    NASA Astrophysics Data System (ADS)

    Marr, W. W.; Sekar, R. R.; Ahlheim, M. C.

    A hybrid bus powered by a diesel engine and a battery pack was analyzed over an idealized bus-driving cycle in Chicago. Three hybrid configurations, two parallel and one series, were evaluated. The results indicate that the fuel economy of a hybrid bus, taking into account the regenerative braking, is comparable with that of a conventional diesel bus. Life-cycle costs are slightly higher because of the added weight and cost of the battery.

  15. Analysis of a diesel-electric hybrid urban bus system

    SciTech Connect

    Marr, W.W.; Sekar, R.R.; Ahlheim, M.C.

    1993-08-01

    A hybrid bus powered by a diesel engine and a battery pack has been analyzed over an idealized bus-driving cycle in Chicago. Three hybrid configurations, two parallel and one series, have been evaluated. The results indicate that the fuel economy of a hybrid bus, taking into account the regenerative braking, is comparable with that of a conventional diesel bus. Life-cycle costs are slightly higher because of the added weight and cost of the battery.

  16. Evaluation of higher distribution and/or utilization voltages. Fourth interim report (August 1980): assessment of optimum distribution configuration

    SciTech Connect

    Not Available

    1981-04-01

    This interim report provides documentation on the fourth task, Assessment of Optimum Distribution Configuration, of DOE Contract No. ET-78-C-01-2866, Evaluation of Higher Distribution and/or Utilization Voltages. The work performed under this task includes the development of a computer model for assessment of life cycle costs for the distribution and utilization systems, the development of an optimization algorithm to enable distribution system configuration optimization and a net energy analysis to determine potential net energy savings. Input data for this task derive from Task 3. The major output of this task is a documented computer code.

  17. Criticality safety evaluation for long term storage of FFTF fuel in interim storage casks

    SciTech Connect

    Richard, R.F.

    1995-05-11

    It has been postulated that a degradation phenomenon, referred to as ``hot cell rot``, may affect irradiated FFTF mixed plutonium-uranium oxide (MOX) fuel during dry interim storage. ``Hot cell rot`` refers to a variety of phenomena that degrade fuel pin cladding during exposure to air and inert gas environments. It is thought to be a form of caustic stress corrosion cracking or environmentally assisted cracking. Here, a criticality safety analysis was performed to address the effect of the ``hot cell rot`` phenomenon on the long term storage of irradiated FFTF fuel in core component containers. The results show that seven FFTF fuel assemblies or six Ident-69 pin containers stored in core component containers within interim storage casks will remain safely subcritical.

  18. Evaluation of ERA-interim and MERRA Cloudiness in the Southern Oceans

    NASA Technical Reports Server (NTRS)

    Naud, Catherine M.; Booth, James F.; Del Genio, Anthony D.

    2014-01-01

    The Southern Ocean cloud cover modeled by the Interim ECMWF Re-Analysis (ERA-Interim) and Modern- Era Retrospective Analysis for Research and Applications (MERRA) reanalyses are compared against Moderate Resolution Imaging Spectroradiometer (MODIS) and Multiangle Imaging Spectroradiometer (MISR) observations. ERA-Interim monthly mean cloud amounts match the observations within 5%, while MERRA significantly underestimates the cloud amount. For a compositing analysis of clouds in warm season extratropical cyclones, both reanalyses show a low bias in cloud cover. They display a larger bias to the west of the cyclones in the region of subsidence behind the cold fronts. This low bias is larger for MERRA than for ERA-Interim. Both MODIS and MISR retrievals indicate that the clouds in this sector are at a low altitude, often composed of liquid, and of a broken nature. The combined CloudSat-Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) cloud profiles confirm these passive observations, but they also reveal that low-level clouds in other parts of the cyclones are also not properly represented in the reanalyses. The two reanalyses are in fairly good agreement for the dynamic and thermodynamic characteristics of the cyclones, suggesting that the cloud, convection, or boundary layer schemes are the problem instead. An examination of the lower-tropospheric stability distribution in the cyclones from both reanalyses suggests that the parameterization of shallow cumulus clouds may contribute in a large part to the problem. However, the differences in the cloud schemes and in particular in the precipitation processes, which may also contribute, cannot be excluded.

  19. Evaluation of the Flexural Strength of Interim Restorative Materials in Fixed Prosthodontics

    PubMed Central

    Mehrpour, Hanieh; Farjood, Ehsan; Giti, Rashin; Barfi Ghasrdashti, Alireza; Heidari, Hossein

    2016-01-01

    Statement of the Problem Mechanical properties of interim restorations are considered as important factors specially when selecting materials for long-term application or for patients with para-functional habits. Flexural strength is one of the most important components of these restorations. Purpose The purpose of this study was to compare the flexural strength of five interim restorative materials. Materials and Method Fifty identical samples sized 25×2×2-mm were made from five interim materials (TempSpan; Protemp 4, Unifast III, Trim, and Revotek LC) according to ADA specification #27. The specimens were stored in artificial saliva for 2 weeks and then thermocycled for 2500 cycles (5-55˚C). A standard three-point bending test was conducted on the specimens with a universal testing machine at a crosshead speed of 0.75mm/min. Data were analyzed by using one-way ANOVA and Tamhane’s post-hoc tests to measure the flexural strength of temporary materials. Results One of the bis-acryl resins (TempSpan) showed the highest, and the light polymerized resin (Revotek LC) showed the lowest flexural strength. The mean values of flexural strength (MPa) for the examined materials were as follow: TempSpan=120.00, Protemp 4=113.00, Unifast III=64.20, Trim= 63.73 and Revotek LC=47.16. There were significant differences between all materials except Trim and Unifast III which did not show any statistical significant difference. Conclusion Bis-acryl resins were statistically superior to traditional methacrylate and light-cured resins. Therefore, application of bis-acryl resins should be deliberated in patients with heavy occlusion and in cases that need long-term use of interim restorations. PMID:27602395

  20. Evaluation of Candidate Measures for Home-Based Screening of Sleep Disordered Breathing in Taiwanese Bus Drivers

    PubMed Central

    Ting, Hua; Huang, Ren-Jing; Lai, Ching-Hsiang; Chang, Shen-Wen; Chung, Ai-Hui; Kuo, Teng-Yao; Chang, Ching-Haur; Shih, Tung-Sheng; Lee, Shin-Da

    2014-01-01

    Background: Sleepiness-at-the-wheel has been identified as a major cause of highway accidents. The aim of our study is identifying the candidate measures for home-based screening of sleep disordered breathing in Taiwanese bus drivers, instead of polysomnography. Methods: Overnight polysomnography accompanied with simultaneous measurements of alternative screening devices (pulse oximetry, ApneaLink, and Actigraphy), heart rate variability, wake-up systolic blood pressure and questionnaires were completed by 151 eligible participants who were long-haul bus drivers with a duty period of more than 12 h a day and duty shifting. Results: 63.6% of professional bus drivers were diagnosed as having sleep disordered breathing and had a higher body mass index, neck circumference, systolic blood pressure, arousal index and desaturation index than those professional bus drivers without evidence of sleep disordered breathing. Simple home-based candidate measures: (1) Pulse oximetry, oxygen-desaturation indices by ≥3% and 4% (r = 0.87∼0.92); (2) Pulse oximetry, pulse-rising indices by ≥7% and 8% from a baseline (r = 0.61∼0.89); and (3) ApneaLink airflow detection, apnea-hypopnea indices (r = 0.70∼0.70), based on recording-time or Actigraphy-corrected total sleep time were all significantly correlated with, and had high agreement with, corresponding polysomnographic apnea-hypopnea indices [(1) 94.5%∼96.6%, (2) 93.8%∼97.2%, (3) 91.1%∼91.3%, respectively]. Conversely, no validities of SDB screening were found in the multi-variables apnea prediction questionnaire, Epworth Sleepiness Scale, night-sleep heart rate variability, wake-up systolic blood pressure and anthropometric variables. Conclusions: The indices of pulse oximetry and apnea flow detection are eligible criteria for home-based screening of sleep disordered breathing, specifically for professional drivers. PMID:24803198

  1. Evaluation of ceramics for stator applications: Gas turbine engines interim report. Stator fabrication and evaluation

    NASA Technical Reports Server (NTRS)

    Arnon, N.; Trela, W.

    1983-01-01

    The objective was to assess current ceramic materials, fabrication processes, reliability prediction, and stator durability when subjected to simulated automotive gas turbine engine operating conditions. Ceramic one-piece stators were fabricated of two materials, silicon nitride and silicon carbide, using two near-net-shape processes, slip casting and injection molding. Non-destructive evaluation tests were conducted on all stators identifying irregularities which could contribute to failures under durability testing. Development of the test rig and automatic control system for repeatably controlling air flow rate and temperature over a highly transient durability duty cycle is discussed. Durability results are presented for repeated thermal cycle testing of the ceramic one-piece stators. Two duty cycles were used, encompassing the temperature ranges of 704 to 1204 C (1300 to 2200 F) and 871 to 1371 C (1600 to 2500 F). Tests were conducted on 28 stators, accumulating 135,551 cycles in 2441 hours of hot testing. Cyclic durability for the ceramic one-piece stator was demonstrated to be in excess of 500 hours, accumulating over 28,850 thermal cycles. Ceramic interface forces were found to be the significant factor in limiting stator life rather than the scatter in material strength properties or the variation in component defects encountered.

  2. Hydrogen powered bus

    ScienceCinema

    None

    2013-11-22

    Take a ride on a new type of bus, fueled by hydrogen. These hydrogen taxis are part of a Department of Energy-funded deployment of hydrogen powered vehicles and fueling infrastructure at nine federal facilities across the country to demonstrate this market-ready advanced technology. Produced and leased by Ford Motor Company , they consist of one 12- passenger bus and one nine-passenger bus. More information at: http://go.usa.gov/Tgr

  3. Interim Guidelines for the Evaluation and Testing of Infants with Possible Congenital Zika Virus Infection - United States, 2016.

    PubMed

    Staples, J Erin; Dziuban, Eric J; Fischer, Marc; Cragan, Janet D; Rasmussen, Sonja A; Cannon, Michael J; Frey, Meghan T; Renquist, Christina M; Lanciotti, Robert S; Muñoz, Jorge L; Powers, Ann M; Honein, Margaret A; Moore, Cynthia A

    2016-01-01

    CDC has developed interim guidelines for health care providers in the United States who are caring for infants born to mothers who traveled to or resided in an area with Zika virus transmission during pregnancy. These guidelines include recommendations for the testing and management of these infants. Guidance is subject to change as more information becomes available; the latest information, including answers to commonly asked questions, can be found online (http://www.cdc.gov/zika). Pediatric health care providers should work closely with obstetric providers to identify infants whose mothers were potentially infected with Zika virus during pregnancy (based on travel to or residence in an area with Zika virus transmission [http://wwwnc.cdc.gov/travel/notices]), and review fetal ultrasounds and maternal testing for Zika virus infection (see Interim Guidelines for Pregnant Women During a Zika Virus Outbreak*) (1). Zika virus testing is recommended for 1) infants with microcephaly or intracranial calcifications born to women who traveled to or resided in an area with Zika virus transmission while pregnant; or 2) infants born to mothers with positive or inconclusive test results for Zika virus infection. For infants with laboratory evidence of a possible congenital Zika virus infection, additional clinical evaluation and follow-up is recommended. Health care providers should contact their state or territorial health department to facilitate testing. As an arboviral disease, Zika virus disease is a nationally notifiable condition. PMID:26820387

  4. Anomalies in Drug Abuse Treatment. Interim Report of the Temporary State Commission to Evaluate the Drug Laws. Legislative Document No. 11.

    ERIC Educational Resources Information Center

    Betros, Emeel S.; And Others

    This interim report of the Temporary New York State Commission to Evaluate the Drug Laws seeks to provide the executive department and the legislature with comprehensive information on the social, fiscal and health problems associated with narcotics addition, and drug abuse. This report is the result of the following: (1) several meetings with…

  5. Evaluation of the D-Area Expanded Operable Unit for Monitored Natural Attenuation of Inorganic Constituents of Concern: Interim Report

    SciTech Connect

    Powell, K.R.

    2003-01-08

    A comprehensive approach is being developed to evaluate SRS sites with inorganic constituents of concern (COCs) for potential implementation of monitored natural attenuation (MNA) as a remediation strategy. In order to invoke MNA, the operative, or controlling, attenuation mechanisms at a given site must be identified and demonstrated using a technically defensible approach and site-specific data. This report details ongoing research in the application of this approach at the D-Area expanded operable unit (DEXOU). Initial screening of the DEXOU described in this interim report indicates that natural attenuation of inorganic COCs (low pH, Cr, Ni, Se, and As) is occurring to a significant degree. This work is part of continuing efforts to characterize the natural attenuation processes, both abiotic and biotic, occurring at this location and likely occurring at other SRS sites with inorganic COCs.

  6. Fuel Cell Bus Takes a Starring Role in the BurbankBus Fleet (Fact Sheet)

    SciTech Connect

    Not Available

    2010-05-01

    This fact sheet reports on the City of Burbank, California's fuel cell bus demonstration project and the U.S. Department of Energy's (DOE) involvement. Included are specifications for the fuel cell bus and information about its operation. BurbankBus, the city's mass transit entity, received a grant from the California Air Resources Board to fund its zero-emission bus demonstration and is collaborating with DOE's Fuel Cell Technologies Program to evaluate the bus performance. DOE's National Renewable Energy Laboratory will collect and analyze performance and operations data for at least one year. Researchers will use the data to better understand the technology and determine future development work. In addition, demonstration information will help fleets make informed purchase decisions.

  7. An Evaluation of the Influence of Interim Assessments on Grade 8 Student Achievement in Mathematics and Language Arts

    ERIC Educational Resources Information Center

    Pereira, Maria; Tienken, Christopher

    2012-01-01

    A review of the literature pertaining to the effect and influence that interim assessments have on student achievement lacks quantitative data to determine the efficiency of their use in the classroom as a school reform tool. This study examined the strength and the direction of the relationships between interim pre and posttest assessments in…

  8. Results of a prospective phase II trial evaluating interim positron emission tomography-guided high dose therapy for poor prognosis diffuse large B-cell lymphoma.

    PubMed

    Stewart, Douglas A; Kloiber, Reinhard; Owen, Carolyn; Bahlis, Nizar J; Duggan, Peter; Mansoor, Adnan; Bence-Bruckler, Isabelle

    2014-09-01

    Patients with diffuse large B-cell lymphoma (DLBCL) with a poor prognosis based upon advanced stage and elevated serum lactate dehydrogenase achieve a 3-4-year progression-free survival (PFS) of only 55%. The role of interim fluoro-2-deoxy-d-glucose (FDG) positron emission tomography (PET) to guide use of upfront high dose chemotherapy (HDCT) and autologous stem cell transplant (ASCT) for patients with poor prognosis DLBCL is unproven. A prospective phase II clinical trial was designed to evaluate the outcomes of HDCT/ASCT for patients with poor prognosis DLBCL aged 18-65 years who had unfavorable interim restaging PET scans. Of the 70 eligible patients, 36 had unfavorable and 34 favorable interim PET responses, with 3-year PFS rates of 65.2% and 52.7%, respectively. In conclusion, favorable interim PET response as defined in this study is not associated with improved PFS rates for patients with poor prognosis DLBCL treated with RCHOP (rituximab, cyclophosphamide, doxorubicin, vincristine, prednisone). A phase III trial evaluating this PET-guided approach is not warranted. PMID:24188476

  9. Creative Bus Financing.

    ERIC Educational Resources Information Center

    Malone, Wade

    1982-01-01

    Alternative ways of financing school bus purchases include financing privately through contractors or commercial banks, financing through sources such as insurance companies and pension funds, leasing the buses, or contracting for transportation services. (Author/MLF)

  10. Evaluation of Dynamic Behavior of Pile Foundations for Interim Storage Facilities Through Geotechnical Centrifuge Tests

    SciTech Connect

    Shizuo Tsurumaki; Hiroyuki Watanabe; Akira Tateishi; Kenichi Horikoshi; Shunichi Suzuki

    2002-07-01

    In Japan, there is a possibility that interim storage facilities for recycled nuclear fuel resources may be constructed on quaternary layers, rather than on hard rock. In such a case, the storage facilities need to be supported by pile foundations or spread foundations to meet the required safety level. The authors have conducted a series of experimental studies on the dynamic behavior of storage facilities supported by pile foundations. A centrifuge modeling technique was used to satisfy the required similitude between the reduced size model and the prototype. The centrifuge allows a high confining stress level equivalent to prototype deep soils to be generated (which is considered necessary for examining complex pile-soil interactions) as the soil strength and the deformation are highly dependent on the confining stress. The soil conditions were set at as experimental variables, and the results are compared. Since 2000, the Nuclear Power Engineering Corporation (NUPEC) has been conducting these research tests under the auspices on the Ministry of Economy, Trade and Industry of Japan. (authors)

  11. Evaluation of groundwater flow and transport at the Shoal underground nuclear test: An interim report

    SciTech Connect

    Pohll, G.; Chapman, J.; Hassan, A.; Papelis, C.; Andricevic, R.; Shirley, C.

    1998-07-01

    Since 1962, all United States nuclear tests have been conducted underground. A consequence of this testing has been the deposition of large amounts of radioactive materials in the subsurface, sometimes in direct contact with groundwater. The majority of this testing occurred on the Nevada Test Site, but a limited number of experiments were conducted in other locations. One of these is the subject of this report, the Project Shoal Area (PSA), located about 50 km southeast of Fallon, Nevada. The Shoal test consisted of a 12-kiloton-yield nuclear detonation which occurred on October 26, 1963. Project Shoal was part of studies to enhance seismic detection of underground nuclear tests, in particular, in active earthquake areas. Characterization of groundwater contamination at the Project Shoal Area is being conducted by the US Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) with the State of Nevada Department of Environmental Protection and the US Department of Defense (DOD). This order prescribes a Corrective Action Strategy (Appendix VI), which, as applied to underground nuclear tests, involves preparing a Corrective Action Investigation Plan (CAIP), Corrective Action Decision Document (CADD), Corrective Action Plan, and Closure Report. The scope of the CAIP is flow and transport modeling to establish contaminant boundaries that are protective of human health and the environment. This interim report describes the current status of the flow and transport modeling for the PSA.

  12. SCSI Communication Test Bus

    NASA Technical Reports Server (NTRS)

    Hua, Chanh V.; D'Ambrose, John J.; Jaworski, Richard C.; Halula, Elaine M.; Thornton, David N.; Heligman, Robert L.; Turner, Michael R.

    1990-01-01

    Small Computer System Interface (SCSI) communication test bus provides high-data-rate, standard interconnection enabling communication among International Business Machines (IBM) Personal System/2 Micro Channel, other devices connected to Micro Channel, test equipment, and host computer. Serves primarily as nonintrusive input/output attachment to PS/2 Micro Channel bus, providing rapid communication for debugger. Opens up possibility of using debugger in real-time applications.

  13. Bus.py

    Energy Science and Technology Software Center (ESTSC)

    2014-07-21

    GridLAB-D is an agent? based distribution system simulation environment that allows fine-grained end-user models, including geospatial and network topology detail. GridLAB-D addresses the lack of runtime interaction by designing a flexible communication interface, Bus.py (pronounced bus-dot-pie), that uses Python to pass messages between one or more GridLAB-D instances and a Smart Grid simulator.

  14. Savannah River bus project

    SciTech Connect

    Summers, W.A.

    1998-08-01

    The H2Fuel Bus is the world`s first hybrid hydrogen electric transit bus. It was developed through a public/private partnership involving several leading technology and industrial organizations in the Southeast, with primary funding and program management provided by the Department of Energy. The primary goals of the project are to gain valuable information on the technical readiness and economic viability of hydrogen buses and to enhance the public awareness and acceptance of emerging hydrogen technologies. The bus has been operated by the transit agency in Augusta, Georgia since April, 1997. It employs a hybrid IC engine/battery/electric drive system, with onboard hydrogen fuel storage based on the use of metal hydrides. Initial operating results have demonstrated an overall energy efficiency (miles per Btu) of twice that of a similar diesel-fueled bus and an operating range twice that of an all-battery powered electric bus. Tailpipe emissions are negligible, with NOx less than 0.2 ppm. Permitting, liability and insurance issues were addressed on the basis of extensive risk assessment and safety analyses, with the inherent safety characteristic of metal hydride storage playing a major role in minimizing these concerns. Future plans for the bus include continued transit operation and use as a national testbed, with potential modifications to demonstrate other hydrogen technologies, including fuel cells.

  15. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Interim report, 1994 Summer

    SciTech Connect

    Winiarski, D.W.

    1995-01-01

    The federal government is the largest single energy consumer in the United States cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studied under that program. This interim report provides the results of a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology-a hot water heater conversion system to convert electrically heated hot water tanks to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.

  16. 7. YOSEMITE VALLEY SHUTTLE BUS AT SENTINEL BRIDGE SHUTTLE BUS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. YOSEMITE VALLEY SHUTTLE BUS AT SENTINEL BRIDGE SHUTTLE BUS AND PARKING LOT AREA. LOOKING WNW. GIS: N-37 40 36.2 / W-119 44 45.0 - Yosemite National Park Roads & Bridges, Yosemite Village, Mariposa County, CA

  17. Emission inventory estimation of an intercity bus terminal.

    PubMed

    Qiu, Zhaowen; Li, Xiaoxia; Hao, Yanzhao; Deng, Shunxi; Gao, H Oliver

    2016-06-01

    Intercity bus terminals are hotspots of air pollution due to concentrated activities of diesel buses. In order to evaluate the bus terminals' impact on air quality, it is necessary to estimate the associated mobile emission inventories. Since the vehicles' operating condition at the bus terminal varies significantly, conventional calculation of the emissions based on average emission factors suffers the loss of accuracy. In this study, we examined a typical intercity bus terminal-the Southern City Bus Station of Xi'an, China-using a multi-scale emission model-(US EPA's MOVES model)-to quantity the vehicle emission inventory. A representative operating cycle for buses within the station is constructed. The emission inventory was then estimated using detailed inputs including vehicle ages, operating speeds, operating schedules, and operating mode distribution, as well as meteorological data (temperature and humidity). Five functional areas (bus yard, platforms, disembarking area, bus travel routes within the station, and bus entrance/exit routes) at the terminal were identified, and the bus operation cycle was established using the micro-trip cycle construction method. Results of our case study showed that switching to compressed natural gas (CNG) from diesel fuel could reduce PM2.5 and CO emissions by 85.64 and 6.21 %, respectively, in the microenvironment of the bus terminal. When CNG is used, tail pipe exhaust PM2.5 emission is significantly reduced, even less than brake wear PM2.5. The estimated bus operating cycles can also offer researchers and policy makers important information for emission evaluation in the planning and design of any typical intercity bus terminals of a similar scale. PMID:27220506

  18. Interim Outcomes Assessment of the Comprehensive Clinical Performance Grid for Student Evaluation.

    ERIC Educational Resources Information Center

    Tolls, Dorothy Bazzinotti; Carlson, Nancy; Wilson, Roger; Richman, Jack

    2001-01-01

    Assessed the viability of the Comprehensive Clinical Performance Grid for Student Evaluation, introduced at The New England College of Optometry in 1996 in clinical student assessment. Analyzed faculty and student feedback and consistency with previous evaluations, between evaluators, and between clinical sites and tracts. Found satisfaction with…

  19. Multipurpose satellite bus (MPS)

    NASA Astrophysics Data System (ADS)

    The Naval Postgraduate School Advanced Design Project sponsored by the Universities Space Research Association Advanced Design Program is a multipurpose satellite bus (MPS). The design was initiated from a Statement of Work (SOW) developed by the Defense Advanced Research Projects Agency (DARPA). The SOW called for a 'proposal to design a small, low-cost, lightweight, general purpose spacecraft bus capable of accommodating any of a variety of mission payloads. Typical payloads envisioned include those associated with meteorological, communication, surveillance and tracking, target location, and navigation mission areas.' The design project investigates two dissimilar missions, a meteorological payload and a communications payload, mated with a single spacecraft bus with minimal modifications. The MPS is designed for launch aboard the Pegasus Air Launched Vehicle (ALV) or the Taurus Standard Small Launch Vehicle (SSLV).

  20. Multipurpose satellite bus (MPS)

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Naval Postgraduate School Advanced Design Project sponsored by the Universities Space Research Association Advanced Design Program is a multipurpose satellite bus (MPS). The design was initiated from a Statement of Work (SOW) developed by the Defense Advanced Research Projects Agency (DARPA). The SOW called for a 'proposal to design a small, low-cost, lightweight, general purpose spacecraft bus capable of accommodating any of a variety of mission payloads. Typical payloads envisioned include those associated with meteorological, communication, surveillance and tracking, target location, and navigation mission areas.' The design project investigates two dissimilar missions, a meteorological payload and a communications payload, mated with a single spacecraft bus with minimal modifications. The MPS is designed for launch aboard the Pegasus Air Launched Vehicle (ALV) or the Taurus Standard Small Launch Vehicle (SSLV).

  1. Interim Guidelines for Evaluation of Instructional Materials with Respect to Social Content.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Curriculum Framework and Instructional Materials Unit.

    The purpose of these guidelines is to provide consistent, systematic standards for evaluating instructional materials proposed for use in California's public schools to ensure compliance with the Education Code. Though they are not intended to supplant the evaluator's judgment, the guidelines do comprise the minimum standards for acceptability in…

  2. Outside Educational Evaluation of the Emergency School Assistance Program. Interim Report.

    ERIC Educational Resources Information Center

    RMC Research Corp., Arlington, VA.

    This progress report describes study objectives, research design, field survey activities, and analysis plans for the evaluation of the Emergency School Assistance Program (ESAP), a federal program to aid local educational agencies in bringing about racial desegregation of their public school systems. A need for evaluation is explained in terms of…

  3. Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

    SciTech Connect

    Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

    2011-06-01

    The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

  4. Evaluation and Assessment Processes in Nebraska Public Schools. A Staff Report. Education Interim Study LR 181.

    ERIC Educational Resources Information Center

    Nebraska Legislative Council, Lincoln. Legislative Research Div.

    During the spring of 1987, the National Conference of State Legislatures awarded the Nebraska Legislature a cost-sharing award to study local school evaluation processes. Embodied in Legislative Resolution 181, which has the purpose of studying school evaluation procedures, the study attempts to provide legislators, educators, local school…

  5. The Follow Through Planned Variation Experiment; Volume V. Appendix: Analysis of Interim Follow Through Evaluation Reports.

    ERIC Educational Resources Information Center

    Villaume, John; Haney, Walt

    This report is the appendix to the last volume in a five volume series on the national evaluation study of the Follow Through Planned Variation Model. The appendix is organized in three sections. Section I provides detailed summaries of five major national Follow Through evaluation reports not published as part of this series. Section II is an…

  6. Low Energy Utilization School: Research, Design, Construction, and Evaluation. Phase 1: Interim Report.

    ERIC Educational Resources Information Center

    Stein, Richard G.; Stein, Carl

    The purpose of this study was to establish more precisely what factors determine energy use in schools, to evaluate the efficiency of and necessity for these, and to make recommendations for the reduction of energy use. These recommendations will be applied to the design of specific projects that will be built, monitored, and evaluated. This…

  7. Personal Computer Monitors Instrumentation Bus

    NASA Technical Reports Server (NTRS)

    Conroy, Bruce L.

    1994-01-01

    IBM-compatible personal computer used instead of logic analyzer or other special instrument to monitor IEEE-488 interface data bus that interconnects various pieces of laboratory equipment. Needed is short program for computer, commercial general-purpose interface bus circuit card, and adapter cable to link card to bus. Software available in Ada or Quick Basic language.

  8. Bus-Programmable Slave Card

    NASA Technical Reports Server (NTRS)

    Hall, William A.

    1990-01-01

    Slave microprocessors in multimicroprocessor computing system contains modified circuit cards programmed via bus connecting master processor with slave microprocessors. Enables interactive, microprocessor-based, single-loop control. Confers ability to load and run program from master/slave bus, without need for microprocessor development station. Tristate buffers latch all data and information on status. Slave central processing unit never connected directly to bus.

  9. Augmented Thermal Bus

    NASA Technical Reports Server (NTRS)

    Schrage, Dean S. (Inventor)

    1996-01-01

    The present invention is directed to an augmented thermal bus. In the present design a plurality of thermo-electric heat pumps are used to couple a source plate to a sink plate. Each heat pump is individually controlled by a model based controller. The controller coordinates the heat pumps to maintain isothermality in the source.

  10. Augmented thermal bus

    NASA Technical Reports Server (NTRS)

    Schrage, Dean S. (Inventor)

    1993-01-01

    The present invention is directed to an augmented thermal bus. In the present design a plurity of thermo-electric heat pumps are used to couple a source plate to a sink plate. Each heat pump is individually controlled by a model based controller. The controller coordinates the heat pump to maintain isothermality in the source.

  11. Bully on the Bus

    ERIC Educational Resources Information Center

    Harrison, Mary M.

    2005-01-01

    Across the U.S., more than 24 million students begin and end their school days on buses. In most cases, the driver is the only adult on board. To transport students safely, the driver must watch the road, not the riders, during most of the trip. Although bus drivers have mirrors and usually see fights, they can easily miss pushing, shoving, and…

  12. SCHOOL BUS GARAGE.

    ERIC Educational Resources Information Center

    PALLIDINO, STEVE; STRIPLING, CHARLES W.

    COUNTY BOARDS, COUNTY SUPERINTENDENTS, SCHOOL PERSONNEL, AND ARCHITECTS PLANNING BUS GARAGE FACILITIES WILL FIND THIS PUBLICATION USEFUL. DECISIONS NEED TO BE MADE IN REGARD TO WHO WILL USE THE GARAGE, WHAT PURPOSE IT SHOULD SERVE, AND WHAT KIND OF SPACES ARE NEEDED. SITE SELECTION FACTORS TO BE CONSIDERED ARE LOCATION, PARKING SPACE, MANEUVERING…

  13. Three Phase Primary Science. Phase Three Evaluation. Interim Report. Research Report No. 24.

    ERIC Educational Resources Information Center

    Wilson, Michael

    This evaluation report is concerned with Phase 3 of the Three Phase Primary Science (TPPS) course piloted in Papua, New Guinea, primary schools in 1969 and which was to be taught in all primary schools in 1973. Phase 1 is a series of activities; Phase 2, a series of simple experiments for the pupils. Phase 3 is a series of more formal experiments…

  14. National Evaluation of the Comprehensive Technical Assistance Centers. Interim Report. NCEE 2010-4033

    ERIC Educational Resources Information Center

    Turnbull, Brenda J.; White, Richard N.; Sinclair, Elizabeth; Riley, Derek; Sipe, Cynthia L.; Pistorino, Carol

    2010-01-01

    This first of two reports presents early findings from the National Evaluation of the Comprehensive Technical Assistance Centers (Comprehensive Centers), a federally funded program that provides technical assistance to states in connection with the No Child Left Behind (NCLB) Act of 2001. The law authorizing the Comprehensive Centers, the…

  15. Evaluation of New Texas Charter Schools: Second Interim Report (2007-10). Executive Summary

    ERIC Educational Resources Information Center

    Maloney, Catherine; Sheehan, Daniel; Rainey, Katharine

    2011-01-01

    The Texas Education Agency (TEA) was awarded Charter School Program (CSP) funding in 2007, and specified that the required evaluation would focus on the experiences and outcomes of new charter schools authorized to begin serving students across 4 school years: 2006-07, 2007-08, 2008-09, and 2009-10. TEA categorizes charter schools in terms of…

  16. The Grimes Alternative School Program and Home Remedies Program. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Williams, Jay R.

    This report describes and evaluates two programs which deal with chronic status offenders: the Grimes Alternative School Program, a delinquency prevention project which targets intermediate school (grades 4 and 5) students with chronic discipline and/or truant behaviors, and the Home Remedies Program, a short-term crisis intervention and…

  17. Civic, Citizenship, and Citizen Education: A National Conference Evaluation Report (Phase I). Interim Report.

    ERIC Educational Resources Information Center

    Farnen, Russell F., Jr.; Smith, Mansfield I.

    This report summarizes the evaluation of a national conference on "Education and Citizenship: Responsibilities for the Common Good" held in Kansas City, Missouri, on September 20-23, 1976. Participants were 400 persons who are interested or involved in political education. The conference involved speeches and papers from experts and leaders in the…

  18. SunLine Leads the Way in Demonstrating Hydrogen-Fueled Bus Technologies (Brochure)

    SciTech Connect

    Not Available

    2011-01-01

    This brochure describes SunLine Transit Agency's newest advanced technology fuel cell electric bus. SunLine is collaborating with the U.S. Department of Energy's Fuel Cell Technologies Program to evaluate the bus in revenue service. This bus represents the sixth generation of hydrogen-fueled buses that the agency has operated since 2000.

  19. Computer-Based Video Instruction to Teach Students with Intellectual Disabilities to Use Public Bus Transportation

    ERIC Educational Resources Information Center

    Mechling, Linda; O'Brien, Eileen

    2010-01-01

    This study investigated the effectiveness of computer-based video instruction (CBVI) to teach three young adults with moderate intellectual disabilities to push a "request to stop bus signal" and exit a city bus in response to target landmarks. A multiple probe design across three students and one bus route was used to evaluate effectiveness of…

  20. Evaluation of Juvenile Fall Chinook Stranding on the Hanford Reach, 1997-1999 Interim Report.

    SciTech Connect

    Wagner, Paul; Nugent, John; Price, William

    1999-02-15

    Pilot work conducted in 1997 to aid the development of the study for the 1998 Evaluation of Juvenile Fall Chinook Stranding on The Hanford Reach. The objectives of the 1997 work were to: (1) identify juvenile chinook production and rearing areas..., (2) identify sampling sites and develop the statistical parameters necessary to complete the study, (3) develop a study plan..., (4) conduct field sampling activities...

  1. Update: Interim Guidance for the Evaluation and Management of Infants with Possible Congenital Zika Virus Infection - United States, August 2016.

    PubMed

    Russell, Kate; Oliver, Sara E; Lewis, Lillianne; Barfield, Wanda D; Cragan, Janet; Meaney-Delman, Dana; Staples, J Erin; Fischer, Marc; Peacock, Georgina; Oduyebo, Titilope; Petersen, Emily E; Zaki, Sherif; Moore, Cynthia A; Rasmussen, Sonja A

    2016-01-01

    CDC has updated its interim guidance for U.S. health care providers caring for infants born to mothers with possible Zika virus infection during pregnancy (1). Laboratory testing is recommended for 1) infants born to mothers with laboratory evidence of Zika virus infection during pregnancy and 2) infants who have abnormal clinical or neuroimaging findings suggestive of congenital Zika syndrome and a maternal epidemiologic link suggesting possible transmission, regardless of maternal Zika virus test results. Congenital Zika syndrome is a recently recognized pattern of congenital anomalies associated with Zika virus infection during pregnancy that includes microcephaly, intracranial calcifications or other brain anomalies, or eye anomalies, among others (2). Recommended infant laboratory evaluation includes both molecular (real-time reverse transcription-polymerase chain reaction [rRT-PCR]) and serologic (immunoglobulin M [IgM]) testing. Initial samples should be collected directly from the infant in the first 2 days of life, if possible; testing of cord blood is not recommended. A positive infant serum or urine rRT-PCR test result confirms congenital Zika virus infection. Positive Zika virus IgM testing, with a negative rRT-PCR result, indicates probable congenital Zika virus infection. In addition to infant Zika virus testing, initial evaluation of all infants born to mothers with laboratory evidence of Zika virus infection during pregnancy should include a comprehensive physical examination, including a neurologic examination, postnatal head ultrasound, and standard newborn hearing screen. Infants with laboratory evidence of congenital Zika virus infection should have a comprehensive ophthalmologic exam and hearing assessment by auditory brainstem response (ABR) testing before 1 month of age. Recommendations for follow-up of infants with laboratory evidence of congenital Zika virus infection depend on whether abnormalities consistent with congenital Zika syndrome

  2. The eddy-current technique for nondestructive evaluation of generator retaining rings: Feasibility study: Interim report

    SciTech Connect

    Elmo, P.M.; Nottingham, L.D.

    1988-05-01

    An evaluation of the feasibility of using eddy current nondestructive inspection techniques to detect intergranular stress corrosion in generator rotor retaining rings was conducted by the EPRI NDE Center. Experiments were conducted using a bend-bar containing representative stress corrosion damage, a calibration block containing electrical discharge machined (EDM) notches, and four retired retaining rings containing EDM notches and stress corrosion damage. An eddy current transducer transport was designed and fabricated to interface with an existing computer-controlled, two-axis positioner and digital eddy current data acquisition system. Test results of experiments performed with this equipment on the retaining ring test-bed provided experimental validation of the eddy current method's feasibility as a retaining ring inspection method. Details are given of the system and its performance under laboratory and simulated service-inspection conditions. 9 refs., 47 figs.

  3. Transuranic storage and assay facility interim safety basis

    SciTech Connect

    Porten, D.R., Fluor Daniel Hanford

    1997-02-12

    The Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis document provides the authorization basis for the interim operation and restriction on interim operations for the TRUSAF. The TRUSAF ISB demonstrates that the TRUSAF can be operated safely, protecting the workers, the public, and the environment. The previous safety analysis document TRUSAF Hazards Identification and Evaluation (WHC 1987) is superseded by this document.

  4. Plug-In Hybrid Electric Vehicle Value Proposition Study: Interim Report: Phase I Scenario Evaluation

    SciTech Connect

    Sikes, Karen R; Markel, Lawrence C; Hadley, Stanton W; Hinds, Shaun; DeVault, Robert C

    2009-01-01

    Plug-in hybrid electric vehicles (PHEVs) offer significant improvements in fuel economy, convenient low-cost recharging capabilities, potential environmental benefits, and decreased reliance on imported petroleum. However, the cost associated with new components (e.g., advanced batteries) to be introduced in these vehicles will likely result in a price premium to the consumer. This study aims to overcome this market barrier by identifying and evaluating value propositions that will increase the qualitative value and/or decrease the overall cost of ownership relative to the competing conventional vehicles and hybrid electric vehicles (HEVs) of 2030 During this initial phase of this study, business scenarios were developed based on economic advantages that either increase the consumer value or reduce the consumer cost of PHEVs to assure a sustainable market that can thrive without the aid of state and Federal incentives or subsidies. Once the characteristics of a thriving PHEV market have been defined for this timeframe, market introduction steps, such as supportive policies, regulations and temporary incentives, needed to reach this level of sustainability will be determined. PHEVs have gained interest over the past decade for several reasons, including their high fuel economy, convenient low-cost recharging capabilities, potential environmental benefits and reduced use of imported petroleum, potentially contributing to President Bush's goal of a 20% reduction in gasoline use in ten years, or 'Twenty in Ten'. PHEVs and energy storage from advanced batteries have also been suggested as enabling technologies to improve the reliability and efficiency of the electric power grid. However, PHEVs will likely cost significantly more to purchase than conventional or other hybrid electric vehicles (HEVs), in large part because of the cost of batteries. Despite the potential long-term savings to consumers and value to stakeholders, the initial cost of PHEVs presents a major

  5. Multiplex data bus simulator

    SciTech Connect

    Garbo, D.L.

    1983-01-01

    A multiplex data-bus simulator for analyzing multiprocessor designs is presented. The simulator was designed to be user-friendly, thus allowing a multiprocessor designer to enter various configuration inputs in a concise and orderly fashion through the use of menus. The designer is also provided a method of visualizing a message traffic flow through the use of graphical representation of events. 3 references.

  6. Interim findings of an evaluation of the U.S. EnergyGuide label

    SciTech Connect

    Egan, Christine; Payne, Christopher T.; Thorne, Jennifer

    2000-08-20

    The United States has labeled appliances with the EnergyGuide labels since 1980. Consensus is growing that this label is confusing to consumers and has little impact on purchase decisions. Many researchers have documented that alternative labeling approaches are effective in other countries. The authors comprehensively evaluated the U.S. appliance labeling program for white goods, heating and cooling equipment, and water heaters, with emphasis on products sold through retail outlets. To date, our research has included consumer focus groups and semi-structured interviews with various market actors to assess how best to communicate energy information. With consumers and retail sales staff, five graphical designs were tested a European-style, letter based graphic; an Australian-style star-based graphic; a speedometer-style graphic; a thermometer-style graphic; and the current U.S. style. With manufacturers and contractors, we did not directly test alternate designs. Instead, we asked their opinion of and experience with the current EnergyGuide labeling program.

  7. 75 FR 5847 - Section 5309 Bus and Bus Facilities Livability Initiative and Urban Circulator Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... general information on the Urban Circulator Program contact Elizabeth Day, Office of Planning and... Federal Transit Administration Section 5309 Bus and Bus Facilities Livability Initiative and Urban... Application Deadline for the Bus and Bus Facilities and Urban Circulator Livability Initiative...

  8. Interim report

    SciTech Connect

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  9. Testing and Treating Women after Unsuccessful Conservative Treatments for Overactive Bladder or Mixed Urinary Incontinence: A Model-Based Economic Evaluation Based on the BUS Study

    PubMed Central

    Barton, Pelham; Middleton, Lee J.; Deeks, Jonathan J.; Daniels, Jane P.; Latthe, Pallavi; Coomarasamy, Arri; Rachaneni, Suneetha; McCooty, Shanteela; Verghese, Tina S.; Roberts, Tracy E.

    2016-01-01

    Objective To compare the cost-effectiveness of bladder ultrasonography, clinical history, and urodynamic testing in guiding treatment decisions in a secondary care setting for women failing first line conservative treatment for overactive bladder or urgency-predominant mixed urinary incontinence. Design Model-based economic evaluation from a UK National Health Service (NHS) perspective using data from the Bladder Ultrasound Study (BUS) and secondary sources. Methods Cost-effectiveness analysis using a decision tree and a 5-year time horizon based on the outcomes of cost per woman successfully treated and cost per Quality-Adjusted Life-Year (QALY). Deterministic and probabilistic sensitivity analyses, and a value of information analysis are also undertaken. Results Bladder ultrasonography is more costly and less effective test-treat strategy than clinical history and urodynamics. Treatment on the basis of clinical history alone has an incremental cost-effectiveness ratio (ICER) of £491,100 per woman successfully treated and an ICER of £60,200 per QALY compared with the treatment of all women on the basis of urodynamics. Restricting the use of urodynamics to women with a clinical history of mixed urinary incontinence only is the optimal test-treat strategy on cost-effectiveness grounds with ICERs of £19,500 per woman successfully treated and £12,700 per QALY compared with the treatment of all women based upon urodynamics. Conclusions remained robust to sensitivity analyses, but subject to large uncertainties. Conclusions Treatment based upon urodynamics can be seen as a cost-effective strategy, and particularly when targeted at women with clinical history of mixed urinary incontinence only. Further research is needed to resolve current decision uncertainty. PMID:27513926

  10. Euro Data Bus

    SciTech Connect

    Engel, H.E.; Hall, J.R. II; Schrock, C.B.

    1995-12-31

    With the disintegration of the Soviet Union and the opening of the Iron Curtain, a downsizing of the Defense Establishment in the West is occurring, causing industry to look for opportunities where technology used for military applications can be applied to meet former East Block countries. Among these requirements has been the urgent desire of the people in former East Block countries for access to Western media which had been denied them, and has led to numerous opportunities for the implementation of Cable Television (CATV) systems. In addition, there are also requirements for utility metering for electricity, gas, water, heat, etc. which had previously been provided to the population by the Government at little or no cost. EWT of Augsburg, Germany, previously a subcontractor to ASEC on military security system projects, who has a subsidiary, TSS, which is a prominent CATV systems house, requested ASEC to provide a system which can provide utility meter reading and other control and monitoring services utilizing CATV. Working with CableBus Systems Corporation, a CATV data communications supplier and various utility meter manufacturers, ASEC, as the System Integrator, has developed a utilities monitoring system. This system. in cooperation with EWT, is being marketed and sold in Europe as EURO DATA BUS. This paper describes EURO DATA BUS and its applications, as well as the actual system designs for two pilot applications. One system is oriented at Utility Meter Reading and Demand side Management primarily, but will also be used to demonstrate other system capabilities such as security and fire alarm monitoring, etc. The design is therefore quite straightforward and {open_quotes}standard{close_quotes}. The second system has more of an industrial orientation and involves the monitoring and load control for a Municipal Electric Utility. While well within the capabilities of the system to accomplish, a more customized design was required to meet these requirements.

  11. Solid waste burial grounds interim safety analysis

    SciTech Connect

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  12. Tennessee Minimum School Bus Standards.

    ERIC Educational Resources Information Center

    Tennessee State Board of Education, 2004

    2004-01-01

    The School Bus Specifications and Procedures adopted by the 2000 National Conference on School Transportation and the Federal Motor Vehicle Safety Standards (FMVSS) were used as guides by the Tennessee State Board of Education Pupil Transportation Advisory Committee in developing the revised minimum specifications for school bus chassis and school…

  13. Evaluation and Analysis of SEASAT-A Scanning Multichannel Microwave Radiometer (SSMR) Antenna Pattern Correction (APC) Algorithm. Sub-task 4: Interim Mode T Sub B Versus Cross and Nominal Mode T Sub B

    NASA Technical Reports Server (NTRS)

    Kitzis, J. L.; Kitzis, S. N.

    1979-01-01

    The brightness temperature data produced by the SMMR Antenna Pattern Correction algorithm are evaluated. The evaluation consists of: (1) a direct comparison of the outputs of the interim, cross, and nominal APC modes; (2) a refinement of the previously determined cos beta estimates; and (3) a comparison of the world brightness temperature (T sub B) map with actual SMMR measurements.

  14. Data bus system development program

    NASA Technical Reports Server (NTRS)

    Harrison, J. S. J.

    1973-01-01

    Two data bus systems were designed fabricated, Data Bus System I and Data Bus System II. The technical features of the delivered hardware include the following: (1) 5 MHz selfclocking data bus; (2) bidirectional communications utilizing Manchester Code at data rates in excess of 20,000 words per second; (3) utilization of MSI COS/MOS technology (4) probability of accepting an erroneous data bit less than 1 in 10 to the 25th power (5) low power consumption (50 to 1 reduction in quiescent current over P/MOS) (6) compatibility with projected high density packaging. Three distinct types of data bus remote terminals were developed: the subsystem interface unit, the combination of an electronic interface unit and a standard interface unit-serial, and an SIU/Preprocessor.

  15. Investigations of emergency destruction methods for recovered, explosively configured, chemical warfare munitions: Interim emergency destruction methods - evaluation report

    SciTech Connect

    Baer, M.R.; Cooper, P.W.; Kipp, M.E.

    1995-07-01

    At the request of the U.S. Army Non-Stockpile Chemical Material Office, the Sandia Explosives Containment System Design Team investigated mature destruction systems for destroying recovered chemical warfare munitions (CWM). The goal of the investigations was to identify and examine available techniques for the destruction of recovered CWM. The result of this study is a recommendation for an interim solution, a solution for use on any munitions found while an optimal, long-term solution is developed. Sandia is also performing the long-term solution study to develop a system that destroys CWM, contains the blast and fragments, and destroys the chemical agent without insult to the environment.

  16. Method for in-use measurement and evaluation of the activity, fuel use, electricity use, and emissions of a plug-in hybrid diesel-electric school bus.

    PubMed

    Choi, Hyung-Wook; Frey, H Christopher

    2010-05-01

    The purpose of this study is to demonstrate a methodology for characterizing at high resolution the energy use and emissions of a plug-in parallel-hybrid diesel-electric school bus (PHSB) to support assessments of sensitivity to driving cycles and comparisons to a conventional diesel school bus (CDSB). Data were collected using onboard instruments for a first-of-a-kind prototype PHSB and a CDSB of the same chassis and engine, operated on actual school bus routes. The engine load was estimated on the basis of vehicle specific power (VSP) and an empirically derived relationship between VSP and engine manifold absolute pressure (MAP). VSP depends on speed, acceleration, and road grade. For the PHSB, the observed electrical discharge or recharge to the traction motor battery was characterized on the basis of VSP. The energy use and emission rates of the PHSB from tailpipe and electricity use were estimated for five real-world driving cycles and compared to the engine fuel use and emissions of the CDSB. The PHSB had the greatest advantage on arterial routes and less advantage on highway or local routes. The coupled VSP-MAP modeling approach enables assessment of a wide variety of driving conditions and comparisons of vehicles with different propulsion technologies. PMID:20380435

  17. Hybrid Electric Transit Bus

    NASA Technical Reports Server (NTRS)

    Viterna, Larry A.

    1997-01-01

    A government, industry, and university cooperative is developing an advanced hybrid electric city transit bus. Goals of this effort include doubling the fuel economy compared to current buses and reducing emissions to one-tenth of current EPA standards. Unique aspects of the vehicle's power system include the use of ultra-capacitors as an energy storage system, and a planned natural gas fueled turbogenerator developed from a small jet engine. Power from both the generator and energy storage system is provided to a variable speed electric motor attached to the rear axle. At over 15000 kg gross weight, this is the largest vehicle of its kind ever built using ultra-capacitor energy storage. This paper describes the overall power system architecture, the evolution of the control strategy, and its performance over industry standard drive cycles.

  18. High-Speed Ring Bus

    NASA Technical Reports Server (NTRS)

    Wysocky, Terry; Kopf, Edward, Jr.; Katanyoutananti, Sunant; Steiner, Carl; Balian, Harry

    2010-01-01

    The high-speed ring bus at the Jet Propulsion Laboratory (JPL) allows for future growth trends in spacecraft seen with future scientific missions. This innovation constitutes an enhancement of the 1393 bus as documented in the Institute of Electrical and Electronics Engineers (IEEE) 1393-1999 standard for a spaceborne fiber-optic data bus. It allows for high-bandwidth and time synchronization of all nodes on the ring. The JPL ring bus allows for interconnection of active units with autonomous operation and increased fault handling at high bandwidths. It minimizes the flight software interface with an intelligent physical layer design that has few states to manage as well as simplified testability. The design will soon be documented in the AS-1393 standard (Serial Hi-Rel Ring Network for Aerospace Applications). The framework is designed for "Class A" spacecraft operation and provides redundant data paths. It is based on "fault containment regions" and "redundant functional regions (RFR)" and has a method for allocating cables that completely supports the redundancy in spacecraft design, allowing for a complete RFR to fail. This design reduces the mass of the bus by incorporating both the Control Unit and the Data Unit in the same hardware. The standard uses ATM (asynchronous transfer mode) packets, standardized by ITU-T, ANSI, ETSI, and the ATM Forum. The IEEE-1393 standard uses the UNI form of the packet and provides no protection for the data portion of the cell. The JPL design adds optional formatting to this data portion. This design extends fault protection beyond that of the interconnect. This includes adding protection to the data portion that is contained within the Bus Interface Units (BIUs) and by adding to the signal interface between the Data Host and the JPL 1393 Ring Bus. Data transfer on the ring bus does not involve a master or initiator. Following bus protocol, any BIU may transmit data on the ring whenever it has data received from its host. There

  19. Available Alternative Fuel School Bus Products--2004

    SciTech Connect

    Not Available

    2004-04-01

    This 4-page Clean Cities fact sheet provides a list of the currently available (and soon to be available) model year 2004 alternative fuel school bus and school bus engine products. It includes information from Blue Bird Corporation, Collins Bus Corporation, Corbeil Bus, Ford Motor Company, General Motors Corporation, Thomas Built Buses, Inc., Clean Air Partners, Cummins Westport, and Deere & Company.

  20. Managing Your District's Bus Contractor.

    ERIC Educational Resources Information Center

    Walsh, Mark A.

    2002-01-01

    Describes the essential elements of a student bus transportation contract with a private transportation service company such as reporting requirements, problem-solving procedures, and performance penalties and incentives. (PKP)

  1. SCHOOL BUS GARAGES, 1966 REVISION.

    ERIC Educational Resources Information Center

    JOHNSON, HERBERT F.

    STANDARDS AND RECOMMENDATIONS ARE GIVEN FOR THE DESIGN AND CONSTRUCTION OF SCHOOL BUS GARAGES INCLUDING BRIEF DISCUSSIONS OF--(1) SITE DEVELOPMENT, (2) DESIGN AND CONSTRUCTION, AND (3) MECHANICAL (HEATING, PLUMBING, AND VENTILATION) AND ELECTRICAL FACTORS. (JT)

  2. Evaluation of higher distribution and/or utilization voltages. Second interim report (March 1979): identification of components and parameters for cost and energy-efficiency analysis

    SciTech Connect

    Not Available

    1981-04-01

    This interim report provides documentation on the second task, Identification of Components and Parameters for Cost and Energy-Efficiency Analysis, of DOE Contract No. ET-78-C-01-2866, Evaluation of Higher Distribution and/or Utilization Voltages. The work performed under this task includes an identification of the elements of the distribution/utilization system, a characterization of the distribution elements and a characterization of end use elements. The purpose of this task is to identify the distribution and utilization system elements which will be subjected to a detailed analysis and computer modeling in later tasks. The elements identified are characterized in terms of their interface with other elements in the system and with respect to their energy consumption, efficiency, and costs. A major output of this task is a list of elements to be modeled under Task 3 and a set of specifications for the computer model to be developed under that task.

  3. Evaluation of gasification and gas cleanup processes for use in molten-carbonate fuel-cell power plants. Task B interim report

    SciTech Connect

    Not Available

    1981-12-01

    This interim report satisfies the Task B requirement for DOE Contract DE-AC21-81MC16220 to define process configurations for systems suitable for supplying fuel to molten carbonate fuel cells (MCFC) in industrial and utility power plants. The information and data necessary for this study were extracted from sources in the public domain, including reports from DOE, EPRI, and EPA; work sponsored in whole or in part by Federal agencies; and from trade journals, MCFC developers, and manufacturers. The configurations include entrained, fluidized-bed, gravitating-bed, and molten salt gasifiers, both air and oxygen blown. Desulfurization systems utilizing wet scrubbing processes, such as Selexol and Rectisol II, and dry sorbents, such as iron oxide and dolomite, were chosen for evaluation.

  4. Evaluation of higher distribution and/or utilization voltages. Third interim report (October 1979): analysis of individual component cost and/or energy efficiencies

    SciTech Connect

    Not Available

    1981-04-01

    This interim report provides documentation on the third task, Analysis of Individual Component Cost and/or Energy Efficiencies, of DOE Contract No. ET-78-C-01-2866, Evaluation of Higher Distribution and/or Utilization Voltages. The work performed under this task includes the development of both cost and energy loss models for the distribution and customer utilization system elements as well as the analysis of critical performance variables for the types of motors in end use elements, as a function of voltage level. The purpose of this task is to provide individual component cost and energy models which will be incorporated in the global system optimization program under Task 4. A major output of this task is a mathematical model for each component's cost and/or energy losses and a graphical representation of each model.

  5. Ring Buffered Network Bus

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This report describes the research effort to demonstrate the integration of a data sharing technology, Ring Buffered Network Bus, in development by Dryden Flight Research Center, with an engine simulation application, the Java Gas Turbine Simulator, in development at the University of Toledo under a grant from the Glenn Research Center. The objective of this task was to examine the application of the RBNB technologies as a key component in the data sharing, health monitoring and system wide modeling elements of the NASA Aviation Safety Program (AVSP) [Golding, 1997]. System-wide monitoring and modeling of aircraft and air safety systems will require access to all data sources which are relative factors when monitoring or modeling the national airspace such as radar, weather, aircraft performance, engine performance, schedule and planning, airport configuration, flight operations, etc. The data sharing portion of the overall AVSP program is responsible for providing the hardware and software architecture to access and distribute data, including real-time flight operations data, among all of the AVSP elements. The integration of an engine code capable of numerically "flying" through recorded flight paths and weather data using a software tool that allows for distributed access of data to this engine code demonstrates initial steps toward building a system capable of monitoring and modeling the National Airspace.

  6. Evaluation of ECMWF interim re-analysis and operational forecast-analysis water vapor in the UTLS using global in-situ FISH measurements

    NASA Astrophysics Data System (ADS)

    Kunz, Anne; Spelten, Nicole; Konopka, Paul; Müller, Rolf; Wernli, Heini

    2014-05-01

    An objective evaluation of the latest atmospheric re-analysis ERA-Interim water vapor in the UTLS is presented by using global in-situ measurements of a large range of airborne measurement campaigns from 2001 to 2011. At the same time, the improvement of the ECMWF operational forecast skill of water vapor is addressed for particular time periods representing different Integrated Forecast System (IFS) cycles. Water vapor measurements are derived from the Fast In-situ Stratospheric Hygrometer (FISH). The meridional extent of these measurements is from the tropics toward the poles. In the vertical, measurements cover isentropic levels from 300 to 400 K and altitudes roughly from 5 to 18 km. The ratio Δ(H2O) = H2OERA/H2OFISH is used as a simple measure for the difference between observations and the re-analysis simulations. Overall, the re-analysis data reproduce around 87% of all FISH measurements within Δ(H2O) = 0.5 - 2, whereas around 27% are within Δ(H2O) = 0.9 - 1.1. Nevertheless, ERA-Interim may even more strongly over- and underestimate FISH water vapor depending on the local atmospheric condition both in the troposphere and in the stratosphere. Δ(H2O) values are found between 0.1 up to 10, with smaller deviations in the stratosphere (Δ(H2O) = 0.5 - 4) than in the troposphere (Δ(H2O) = 0.5 - 10). In the entire tropical stratosphere a ratio of better than Δ(H2O) = 0.5 - 2 is found. Toward the extratropical stratosphere this ratio weakens with Δ(H2O) = 0.1 - 4 through dynamical processes at the extratropical tropopause. Finally, largest deviations between ERA-Interim and the observations are found in the tropical and extratropical troposphere as well as in the extratropical lower stratosphere. The operational forecast skill improves over the time, in particular when comparing water vapor fields for time periods before 2004 and after 2010. In any event, influences of tropical tropospheric processes as well as extratropical lower stratospheric processes on

  7. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  8. A study of multiplex data bus techniques for the space shuttle

    NASA Technical Reports Server (NTRS)

    Kearney, R. J.; Kalange, M. A.

    1972-01-01

    A comprehensive technology base for the design of a multiplexed data bus subsystem is provided. Extensive analyses, both analytical and empirical, were performed. Subjects covered are classified under the following headings: requirements identification and analysis; transmission media studies; signal design and detection studies; synchronization, timing, and control studies; user-subsystem interface studies; operational reliability analyses; design of candidate data bus configurations; and evaluation of candidate data bus designs.

  9. Development and validation of a self-report measure of bus driver behaviour.

    PubMed

    Dorn, Lisa; Stephen, Lucy; af Wåhlberg, Anders; Gandolfi, Julie

    2010-12-01

    There are likely to be individual differences in bus driver behaviour when adhering to strict schedules under time pressure. A reliable and valid assessment of these individual differences would be useful for bus companies keen to mitigate risk of crash involvement. This paper reports on three studies to develop and validate a self-report measure of bus driver behaviour. For study 1, two principal components analyses of a pilot questionnaire revealed six components describing bus driver behaviour and four bus driver coping components. In study 2, test-retest reliability of the components were tested in a sub-sample and found to be adequate. Further, the 10 components were used to predict bus crash involvement at three levels of culpability with consistently significant associations found for two components. For study 3, avoidance coping was consistently associated with celeration variables in a bus simulator, especially for a time-pressured drive. STATEMENT OF RELEVANCE: The instrument can be used by bus companies for driver stress and fatigue management training to identify at-risk bus driver behaviour. Training to reduce the tendency to engage in avoidance coping strategies, improve evaluative coping strategies and hazard monitoring when under stress may improve bus driver safety. PMID:21108079

  10. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethylether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operation in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work

  11. Faculty and Student Views of the Interim Term

    ERIC Educational Resources Information Center

    Centra, John A.; Sobol, Marion G.

    1974-01-01

    Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)

  12. Evaluation of the Steel Creek ecosystem in relation to the proposed restart of the L-Reactor: interim report

    SciTech Connect

    Not Available

    1983-09-01

    This interim report of findings from studies by SREL has updated information on several key components of the Steel Creek ecosystem. We have emphasized two categories of the Steel Creek biota: Endangered Species (American alligator) and species for which environmental degradation within SRP boundaries might result in changes in offsite resource abundance. Wintering waterfowl surveys in the vicinity of the Steel Creek delta have demonstrated a pattern of increased utilization over the duration of these studies (1981-83). Wood stork utilization of SRP swamp areas also appeared to be substantially increased relative to previous years. Thermal alteration of the Steel Creek delta areas will eliminate this area as wood stork foraging habitat. Anadromous fish utilization of the Steel Creek area was also substantially increased in 1983 relative to 1982. The differences in anadromous fish species utilization patterns between 1982 and 1983 are probably a result of the markedly different river flow conditions between the two years. Studies of the American alligator have continued. No further reproduction by alligators has been observed in the Steel Creek system. 24 references, 14 figures, 13 tables.

  13. Evaluation of tuff as a medium for a nuclear waste repository: interim status report on the properties of tuff

    SciTech Connect

    Johnstone, J.K.; Wolfsberg, K.

    1980-07-01

    This report is the second in a series of summary briefings to the National Academy of Science`s (NAS) Committee on Radioactive Waste Management dealing with feasibility of disposal of heat-producing radioactive waste in silicic tuff. The interim status of studies of tuff properties determined on samples obtained from Yucca Mountain and Rainier Mesa (G-tunnel) located on the Nevada Test Site (NTS) are discussed. In particular, progress is described on resolving issues identified during the first briefing to the NAS which include behavior of water in tuff when heated, the effect of the presence or absence of water and joints on the thermal/physical properties of tuff and the detailed/complex sorptive properties of highly altered and unaltered tuff. Initial correlations of thermal/physical and sorptive properties with the highly variable porosity and mineralogy are described. Three in-situ, at-depth field experiments, one nearly completed and two just getting underway are described. In particular, the current status of mineralogy and petrology, geochemistry, thermal and mechanical, radiation effects and water behavior studies are described. The goals and initial results of a Mine Design Working Group are discussed. Regional factors such as seismicity, volcanism and hydrology are not discussed.

  14. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    SciTech Connect

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  15. Forecast analysis of optical waveguide bus performance

    NASA Technical Reports Server (NTRS)

    Ledesma, R.; Rourke, M. D.

    1979-01-01

    Elements to be considered in the design of a data bus include: architecture; data rate; modulation, encoding, detection; power distribution requirements; protocol, work structure; bus reliability, maintainability; interterminal transmission medium; cost; and others specific to application. Fiber- optic data bus considerations for a 32 port transmissive star architecture, are discussed in a tutorial format. General optical-waveguide bus concepts, are reviewed. The electrical and optical performance of a 32 port transmissive star bus, and the effects of temperature on the performance of optical-waveguide buses are examined. A bibliography of pertinent references and the bus receiver test results are included.

  16. The use of contingent-interrupted music in the treatment of disruptive bus-riding behavior.

    PubMed

    Barmann, B C; Croyle-Barmann, C; McLain, B

    1980-01-01

    The present study evaluated the efficacy of using contingent-interrupted music in treating the disruptive bus-riding behavior of an 8-year-old profoundly retarded female. Music was played during each bus ride as long as the subject was sitting appropriately, and interrupted contingent upon each response defined as disruptive bus riding, during an ABCDCDCDA design. A significant reduction in disruptive bus riding occurred with each introduction of contingent-interrupted music. The treatment procedure described in this report was easy to administer, produced rapid treatment gains, and showed virtually no regression during an 8-week follow-up period. PMID:7204285

  17. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the

  18. Multi-purpose satellite bus

    NASA Technical Reports Server (NTRS)

    Sakoda, Daniel; Agrawal, Brij N.

    1991-01-01

    The Multi-Purpose Satellite bus (MPS) can be used for a number of payloads which may require different orbits, pointing accuracy, and electrical power consumption. Specifically, it was designed to accommodate the Advanced Very High Resolution Radiometer and an EHF communication payload, both of which have a three-year life. The estimated beginning-of-life weight of the MPS bus is 150 kg. It can be launched by either the Pegasus ALV or the Taurus SSLV. Configuration requirements for the different missions are discussed.

  19. Effect of bus size and operation to crash occurrences.

    PubMed

    Chimba, Deo; Sando, Thobias; Kwigizile, Valerian

    2010-11-01

    This paper evaluates roadway and operational factors considered to influence crashes involving buses. Factors evaluated included those related to bus sizes and operation services. Negative binomial (NB) and multinomial logit (MNL) models were used in linearizing and quantifying these factors with respect to crash frequency and injury severities, respectively. The results showed that position of the bus travel lane, presence or absence of on-street shoulder parking, posted speed limit, lane width, median width, number of lanes per direction and number of vehicles per lane has a higher influence on bus crashes compared to other roadway and traffic factors. Wider lanes and medians were found to reduce probability of bus crashes while more lanes and higher volume per lane were found to increase the likelihood of occurrences of bus-related crashes. Roadways with higher posted speed limits excluding freeways were found to have high probability of crashes compared to low speed limit roadways. Buses traveling on the inner lanes and making left turns were found to have higher probability of crashes compared to those traveling on the right most lanes. The same factors were found to influence injury severity though with varying magnitudes compared to crash frequency. PMID:20728663

  20. Tacoma gets the early bus

    SciTech Connect

    Kelly, T.

    1991-10-01

    What happened, then, when Tacoma, Washington and Seattle each set about choosing an alternative bus fuel in the interests of clean air Not what you'd think. In a major role reversal, Seattle got headaches, while Tacoma got the distinction of being a national pioneer. That's because it was Tacoma that chose natural gas. Ron Shipley is director of maintenance for Pierce Transit, the 11-year-old municipal corporation that runs buses in Tacoma's Pierce County. He remembers getting a call from a representative of Washington Natural Gas (WNG) in the mid-1980s. WNG was trying to cultivate interest in natural gas vehicles. The two busses were placed in service in November 1986. After a three-year initial evaluation period, Pierce County Transit drew up a report indicating it was pleased with the results this far and optimistic about the use of natural gas as a motor fuel. The company calculated a break-even of 68 cents per gallon, meaning that when diesel was at the price or above, natural gas used in its place was a money-saver. By January of this year, diesel was at $1.10 per gallon. This paper reports that emissions were not tested because of the expense involved and the fact that future conversions would use a different technology. Shipley doubted, anyway, that the 60-40 combination would quite meet the emissions standards then in effect for 1991. But is was clear at a glance that particulate matter - the biggest pollution threat from diesel buses - had been significantly reduced. And that good start encouraged Pierce Transit management to plan for a fleet of vehicles that could burn 100 percent natural gas.

  1. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN Ensuring Protection of the Natural... restoration success of the Plan may be evaluated, and ultimately reported to Congress in accordance with § 385...) Purpose. (1) Interim goals are a means by which the restoration success of the Plan may be evaluated...

  2. The NASA bus communications listening device software

    NASA Technical Reports Server (NTRS)

    Allen, M. A.

    1979-01-01

    The development of the bus listener is presented. Special software was developed to control the 'bus interface units' (BIU) connecting each of these devices to a communications cable to form the bus communication network. The code used in the BTU is described.

  3. School Bus Accidents and Driver Age.

    ERIC Educational Resources Information Center

    McMichael, Judith

    The study examines the rates and types of school bus accidents according to the age of the school bus driver. Accident rates in North Carolina for the school year 1971-72 were analyzed using three sources of data: accident reports, driver and mileage data, and questionnaires administered to a sample of school bus drivers. Data were obtained on…

  4. School Bus Alert System Reduces Delays.

    ERIC Educational Resources Information Center

    Pleasnick, Stephen G.

    1985-01-01

    The school bus alert monitor is a computerized school bus alert and warning sytem that notifies parents of school bus arrival via radio frequency technology. The system also has been shown to enhance the self esteem of disabled transportation users. (CL)

  5. HERMES travels by CAN bus

    NASA Astrophysics Data System (ADS)

    Waller, Lewis G.; Shortridge, Keith; Farrell, Tony J.; Vuong, Minh; Muller, Rolf; Sheinis, Andrew I.

    2014-07-01

    The new HERMES spectrograph represents the first foray by AAO into the use of commercial off-the-shelf industrial field bus technology for instrument control, and we regard the final system, with its relatively simple wiring requirements, as a great success. However, both software and hardware teams had to work together to solve a number of problems integrating the chosen CANopen/CAN bus system into our normal observing systems. A Linux system running in an industrial PC chassis ran the HERMES control software, using a PCI CAN bus interface connected to a number of distributed CANopen/CAN bus I/O devices and servo amplifiers. In the main, the servo amplifiers performed impressively, although some experimentation with homing algorithms was required, and we hit a significant hurdle when we discovered that we needed to disable some of the encoders used during observations; we learned a lot about how servo amplifiers respond when their encoders are turned off, and about how encoders react to losing power. The software was based around a commercial CANopen library from Copley Controls. Early worries about how this heavily multithreaded library would work with our standard data acquisition system led to the development of a very low-level CANopen software simulator to verify the design. This also enabled the software group to develop and test almost all the control software well in advance of the construction of the hardware. In the end, the instrument went from initial installation at the telescope to successful commissioning remarkably smoothly.

  6. Synchronizing Data-Bus Messages

    NASA Technical Reports Server (NTRS)

    Harris, L. H.

    1985-01-01

    Adapter allows communications among as many as 30 data processors without central bus controller. Adapter improves reliability of multiprocessor system by eliminating point of failure that causes entire system to fail. Scheme prevents data collisions and eliminates nonessential polling, thereby reducing power consumption.

  7. The Great School Bus Controversy.

    ERIC Educational Resources Information Center

    Mills, Nicolaus, Ed.

    This anthology attempts to put the great school bus controversy of the 1970's in perspective by providing a forum in which a series of widely differing views, backed by hard data, can be compared. The first section, "Background and Legal History," places the controversy in a perspective that predates the 1970's. One article focuses on the history…

  8. Pybus -- A Python Software Bus

    SciTech Connect

    Lavrijsen, Wim T.L.P.

    2004-10-14

    A software bus, just like its hardware equivalent, allows for the discovery, installation, configuration, loading, unloading, and run-time replacement of software components, as well as channeling of inter-component communication. Python, a popular open-source programming language, encourages a modular design on software written in it, but it offers little or no component functionality. However, the language and its interpreter provide sufficient hooks to implement a thin, integral layer of component support. This functionality can be presented to the developer in the form of a module, making it very easy to use. This paper describes a Pythonmodule, PyBus, with which the concept of a ''software bus'' can be realized in Python. It demonstrates, within the context of the ATLAS software framework Athena, how PyBus can be used for the installation and (run-time) configuration of software, not necessarily Python modules, from a Python application in a way that is transparent to the end-user.

  9. Evaluation of an ensemble of regional climate model simulations over South America driven by the ERA-Interim reanalysis: model performance and uncertainties

    NASA Astrophysics Data System (ADS)

    Solman, Silvina A.; Sanchez, E.; Samuelsson, P.; da Rocha, R. P.; Li, L.; Marengo, J.; Pessacg, N. L.; Remedio, A. R. C.; Chou, S. C.; Berbery, H.; Le Treut, H.; de Castro, M.; Jacob, D.

    2013-09-01

    The capability of a set of 7 coordinated regional climate model simulations performed in the framework of the CLARIS-LPB Project in reproducing the mean climate conditions over the South American continent has been evaluated. The model simulations were forced by the ERA-Interim reanalysis dataset for the period 1990-2008 on a grid resolution of 50 km, following the CORDEX protocol. The analysis was focused on evaluating the reliability of simulating mean precipitation and surface air temperature, which are the variables most commonly used for impact studies. Both the common features and the differences among individual models have been evaluated and compared against several observational datasets. In this study the ensemble bias and the degree of agreement among individual models have been quantified. The evaluation was focused on the seasonal means, the area-averaged annual cycles and the frequency distributions of monthly means over target sub-regions. Results show that the Regional Climate Model ensemble reproduces adequately well these features, with biases mostly within ±2 °C and ±20 % for temperature and precipitation, respectively. However, the multi-model ensemble depicts larger biases and larger uncertainty (as defined by the standard deviation of the models) over tropical regions compared with subtropical regions. Though some systematic biases were detected particularly over the La Plata Basin region, such as underestimation of rainfall during winter months and overestimation of temperature during summer months, every model shares a similar behavior and, consequently, the uncertainty in simulating current climate conditions is low. Every model is able to capture the variety in the shape of the frequency distribution for both temperature and precipitation along the South American continent. Differences among individual models and observations revealed the nature of individual model biases, showing either a shift in the distribution or an overestimation

  10. Evaluation of Shear Strength Threshold of Concern for Retrieval of Interim-Stored K-Basin Sludge in the Hanford Site

    SciTech Connect

    Onishi, Yasuo; Yokuda, Satoru T.; Schmidt, Andrew J.

    2010-11-01

    K-Basin sludge will be recovered into the Sludge Transport and Storage Containers (STSCs) and will be stored in the T Plant for interim storage (at least 10 years). Long-term sludge storage tests conducted by Pacific Northwest National Laboratory show that high uranium content K Basin sludge can self-cement and form a strong sludge with a bulk shear strength of up to 65 kPa. Some of this sludge has "paste" and "chunks" with shear strengths of approximately 3~5 kPa and 380 ~ 770 kPa, respectively. High uranium content sludge samples subjected to hydrothermal testing (e.g., 185°C, 10 h) have been observed to form agglomerates with a shear strength up to 170 kPa. After interim storage at T Plant, the sludge in the STSCs will be mobilized by water jets impinging the sludge. The objective of the evaluation was to determine the range of sludge shear strength for which there is high confidence that a water-jet retrieval system can mobilize stored K-Basin sludge from STSCs. The shear strength at which the sludge can be retrieved is defined as the "shear strength threshold of concern." If the sludge shear strength is greater than the value of the shear strength threshold of concern, a water-jet retrieval system will be unlikely to mobilize the sludge up to the container’s walls. The shear strength threshold of concern can be compared with the range of possible shear strengths of K-Basin stored sludge to determine if the current post interim-storage, water-jet retrieval method is adequate. Fourteen effective cleaning radius (ECR) models were reviewed, and their validity was examined by applying them to Hanford 241-SY-101 and 241-AZ-101 Tanks to reproduce the measured ECR produced by the mixer pumps. The validation test identified that the Powell-3 and Crowe-2 ECR models are more accurate than other ECR models reviewed. These ECR models were used to address a question as to whether the effective cleaning radius of a water jet is sufficient or if it can be readily expanded

  11. Quality, Equity, Accountability: Long-Range Plan for Public Education, 1991-1995. Interim Evaluation, 1991-1992.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This document presents an evaluation of actions taken by the Texas State Board of Education during the 1991-92 school year to achieve the goals and objectives of its "Long-Range Plan." Following the vision statement, an evaluation summary describes progress made toward statewide education goals. Each of the nine chapters after the evaluation…

  12. Analysis of robustness of urban bus network

    NASA Astrophysics Data System (ADS)

    Tao, Ren; Yi-Fan, Wang; Miao-Miao, Liu; Yan-Jie, Xu

    2016-02-01

    In this paper, the invulnerability and cascade failures are discussed for the urban bus network. Firstly, three static models(bus stop network, bus transfer network, and bus line network) are used to analyse the structure and invulnerability of urban bus network in order to understand the features of bus network comprehensively. Secondly, a new way is proposed to study the invulnerability of urban bus network by modelling two layered networks, i.e., the bus stop-line network and the bus line-transfer network and then the interactions between different models are analysed. Finally, by modelling a new layered network which can reflect the dynamic passenger flows, the cascade failures are discussed. Then a new load redistribution method is proposed to study the robustness of dynamic traffic. In this paper, the bus network of Shenyang City which is one of the biggest cities in China, is taken as a simulation example. In addition, some suggestions are given to improve the urban bus network and provide emergency strategies when traffic congestion occurs according to the numerical simulation results. Project supported by the National Natural Science Foundation of China (Grant Nos. 61473073, 61374178, 61104074, and 61203329), the Fundamental Research Funds for the Central Universities (Grant Nos. N130417006, L1517004), and the Program for Liaoning Excellent Talents in University (Grant No. LJQ2014028).

  13. Electrical system architecture having high voltage bus

    DOEpatents

    Hoff, Brian Douglas; Akasam, Sivaprasad

    2011-03-22

    An electrical system architecture is disclosed. The architecture has a power source configured to generate a first power, and a first bus configured to receive the first power from the power source. The architecture also has a converter configured to receive the first power from the first bus and convert the first power to a second power, wherein a voltage of the second power is greater than a voltage of the first power, and a second bus configured to receive the second power from the converter. The architecture further has a power storage device configured to receive the second power from the second bus and deliver the second power to the second bus, a propulsion motor configured to receive the second power from the second bus, and an accessory motor configured to receive the second power from the second bus.

  14. The International Space Station Interim Control Module EPS

    SciTech Connect

    Baker, W.E.

    1998-07-01

    Under contract to the National Aeronautics and Space Administration (NASA), the US Naval Research Laboratory (NRL) is building a backup propulsion module, the Interim Control Module (ICM), for the International Space Station (ISS). The ICM will be used to reboost the ISS periodically to make up for orbit degradation caused by atmospheric drag. The ICM Electrical Power System (EPS) is similar the Clementine EPS with additional features to make it highly fault tolerant. The vehicle has 16 body mounted solar arrays populated with single junction, Gallium Arsenide solar cells and two 23 cell, 34 ampere-hour nickel cadmium batteries directly connected to a single power bus.

  15. School Bus Safety.

    ERIC Educational Resources Information Center

    Stroup, Karen Bruner; And Others

    1991-01-01

    Equipment to allow safe transportation of disabled children is reviewed. Such equipment includes infant car seats, child safety seats, safety vests, and accommodations for children in casts and/or braces. Five principles for evaluation and selection of safe seating options are given as are safety rules and information on standards and resources.…

  16. PinBus Interface Design

    SciTech Connect

    Hammerstrom, Donald J.; Adgerson, Jewel D.; Sastry, Chellury; Pratt, Richard M.; Pratt, Robert G.

    2009-12-30

    On behalf of the U.S. Department of Energy, PNNL has explored and expanded upon a simple control interface that might have merit for the inexpensive communication of smart grid operational objectives (demand response, for example) to small electric end-use devices and appliances. The approach relies on bi-directional communication via the electrical voltage states of from one to eight shared interconnection pins. The name PinBus has been suggested and adopted for the proposed interface protocol. The protocol is defined through the presentation of state diagrams and the pins’ functional definitions. Both simulations and laboratory demonstrations are being conducted to demonstrate the elegance and power of the suggested approach. PinBus supports a very high degree of interoperability across its interfaces, allowing innumerable pairings of devices and communication protocols and supporting the practice of practically any smart grid use case.

  17. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach in the Columbia River, 1998 Interim Report.

    SciTech Connect

    Nugent, John; Newsome, Todd; Nugent, Michael

    2001-07-27

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the second year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fish species, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1998 field season.

  18. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Interim controls. 35.1330 Section 35.1330 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and...

  19. EVALUATION OF THE EFFECTIVENESS OF COATINGS IN REDUCING DISLODGEABLE ARSENIC, CHROMIUM, AND COPPER FROM CCA TREATED WOOD, INTERIM DATA REPORT

    EPA Science Inventory

    EPA is approximately 20 months into a project to evaluate the performance of wood coatings as a way to prevent arsenic, chromium and copper exposure from the surfaces of CCA treated wood. Potential dermal exposure, as measured by wipe sampling dislodgeable CCA chemical from wood ...

  20. The Evaluation of a Job-Oriented Basic Skills Training Program--Interim Report, July 1979-July 1981.

    ERIC Educational Resources Information Center

    Baker, Meryl S.; Huff, Kent H.

    The Job-Oriented Basic Skills (JOBS) program was evaluated to determine whether it could compensate for skill deficiencies of lower aptitude personnel so that they could successfully complete Navy technical schools and perform to standard in the fleet. JOBS curricula were developed for four content strands (aggregations of 12 Class "A" schools…

  1. Evaluation of Worker Profiling and Reemployment Services Systems: Interim Report. Unemployment Insurance Occasional Paper 96-1.

    ERIC Educational Resources Information Center

    Hawkins, Evelyn K.; And Others

    The Evaluation of Worker Profiling and Reemployment Services (WPRS) systems was designed to provide the U.S. Department of Labor information on how states are designing, implementing, and operating their worker profiling and reemployment services systems for dislocated workers and to compare the effectiveness of different state approaches to…

  2. Interim Evaluation of the Pilot Program of the Truancy Case Management Partnership Intervention in the District of Columbia

    ERIC Educational Resources Information Center

    Liberman, Akiva; Cahill, Meagan; Cramer, Lindsey

    2012-01-01

    The Case Management Partnership Initiative (CMPI) addresses chronic truancy by linking truant ninth graders and their families to social services and case management, along with regular interagency case management meetings. A pilot was conducted at Anacostia and Ballou High Schools in 2011-2012. The implementation evaluation found that the pilot…

  3. Job Enrichment: Evaluation with Implications for Air Force Job Redesign. Interim Report, 1 January 1975-30 April 1977.

    ERIC Educational Resources Information Center

    Watson, Thomas W.; Zumbro, Patrick A.

    The main text of this report consists of a review and evaluation of job enrichment as an approach to job redesign, with implications for Air Force research and application. In addition, two appendixes are included: the first, a supplemental historical discussion; the second, a ninety-six-item annotated bibliography. Specific objectives are to…

  4. School Choice in New York City after Two Years: An Evaluation of the School Choice Scholarships Program. Interim Report.

    ERIC Educational Resources Information Center

    Myers, David; Peterson, Paul; Mayer, Daniel; Chou, Julia; Howell, William G.

    This report describes the second-year results for an evaluation of the School Choice Scholarships Foundation (SCSF) program to award 1,300 scholarships so that children of low-income families in grades 1 through 4 in New York City public schools could transfer to private schools. Because the scholarships were awarded through a lottery, the…

  5. Evaluation of higher distribution and/or utilization voltages. First interim report (December 1978): literature search and problem definition

    SciTech Connect

    Not Available

    1981-04-01

    A literature search has been conducted on the economics and technical problems associated with the use of higher voltages in both the primary distribution and secondary utilization systems. After a literature review and evaluation, an assessment of the state-of-the-art with regard to high voltage has been made and is presented for the primary and secondary distribution systems, end use elements, and economics and system analysis or optimization. An annotated bibliography is provided for each of the three categories. A comprehensive list of potential advantages and disadvantages of higher primary distribution and utilization voltages has also been prepared and is presented.

  6. Interim Budget Plan.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This report provides the interim budget plan of the U.S. Department of Education's Office of Student Financial Assistance (OSFA) for fiscal year 2000. It reviews factors influencing OSFA's budget request, including legislative requirements, recent accomplishments, the need to maintain both the Direct Loan and Federal Family Education Loan…

  7. Effects of a Universally Free, In-Classroom School Breakfast Program: Results from the Second Year of the Maryland Meals for Achievement Evaluation. Interim Report.

    ERIC Educational Resources Information Center

    Murphy, J. Michael; Rankin, Emunah; Feeney, Kelly; Kenney, Leigh; Kleinman, Ron

    Noting that many children in the United States are not well nourished despite the recent economic boom, the state of Maryland began the Maryland Meals for Achievement (MMFA) program, a demonstration project to see if providing a classroom breakfast free to all students can improve student nutrition and academic achievement. This interim report…

  8. Program Evaluations. Lessons from Experience: An Interim Review of the Youth Employment and Demonstration Projects Act. Youth Knowledge Development Report 3.19.

    ERIC Educational Resources Information Center

    Butler, Eric; Parker, Jim

    This interim review of the Youth Employment and Demonstration Projects Act (YEDPA) youth programs focuses on five topics through which were considered the universe of need, program experience, and policy recommendations. Chapter 1 is an introduction which briefly describes the law itself, including summaries of its major parts. It also discusses…

  9. 76 FR 37393 - FY 2011 Discretionary Livability Funding Opportunity; Section 5309 Bus and Bus Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ...The Federal Transit Administration (FTA) announces the availability of discretionary funds in Fiscal Year (FY) 2011 for two programs in support of the Department of Transportation's (DOT) Livability Initiative: the Bus and Bus Facilities grant funds (49 U.S.C. 5309(b)) (``Bus Livability Program'') and the Alternatives Analysis Program (49 U.S.C. 5339), both authorized by the Safe, Accountable,......

  10. Evaluation of interim and final waste forms for the newly generated liquid low-level waste flowsheet

    SciTech Connect

    Abotsi, G.M.K.; Bostick, D.T.; Beck, D.E.

    1996-05-01

    The purpose of this review is to evaluate the final forms that have been proposed for radioactive-containing solid wastes and to determine their application to the solid wastes that will result from the treatment of newly generated liquid low-level waste (NGLLLW) and Melton Valley Storage Tank (MVST) supernate at the Oak Ridge National Laboratory (ORNL). Since cesium and strontium are the predominant radionuclides in NGLLLW and MVST supernate, this review is focused on the stabilization and solidification of solid wastes containing these radionuclides in cement, glass, and polymeric materials-the principal waste forms that have been tested with these types of wastes. Several studies have shown that both cesium and strontium are leached by distilled water from solidified cement, although the leachabilities of cesium are generally higher than those of strontium under similar conditions. The situation is exacerbated by the presence of sulfates in the solution, as manifested by cracking of the grout. Additives such as bentonite, blast-furnace slag, fly ash, montmorillonite, pottery clay, silica, and zeolites generally decrease the cesium and strontium release rates. Longer cement curing times (>28 d) and high ionic strengths of the leachates, such as those that occur in seawater, also decrease the leach rates of these radionuclides. Lower cesium leach rates are observed from vitrified wastes than from grout waste forms. However, significant quantities of cesium are volatilized due to the elevated temperatures required to vitrify the waste. Hence, vitrification will generally require the use of cleanup systems for the off-gases to prevent their release into the atmosphere.

  11. Implementation and adoption of nationwide electronic health records in secondary care in England: qualitative analysis of interim results from a prospective national evaluation

    PubMed Central

    Robertson, Ann; Cresswell, Kathrin; Takian, Amirhossein; Petrakaki, Dimitra; Crowe, Sarah; Cornford, Tony; Barber, Nicholas; Avery, Anthony; Fernando, Bernard; Jacklin, Ann; Prescott, Robin; Klecun, Ela; Paton, James; Lichtner, Valentina; Quinn, Casey; Ali, Maryam; Morrison, Zoe; Jani, Yogini; Waring, Justin; Marsden, Kate

    2010-01-01

    Objectives To describe and evaluate the implementation and adoption of detailed electronic health records in secondary care in England and thereby provide early feedback for the ongoing local and national rollout of the NHS Care Records Service. Design A mixed methods, longitudinal, multisite, socio-technical case study. Setting Five NHS acute hospital and mental health trusts that have been the focus of early implementation efforts and at which interim data collection and analysis are complete. Data sources and analysis Dataset for the evaluation consists of semi-structured interviews, documents and field notes, observations, and quantitative data. Qualitative data were analysed thematically with a socio-technical coding matrix, combined with additional themes that emerged from the data. Main results Hospital electronic health record applications are being developed and implemented far more slowly than was originally envisioned; the top-down, standardised approach has needed to evolve to admit more variation and greater local choice, which hospital trusts want in order to support local activity. Despite considerable delays and frustrations, support for electronic health records remains strong, including from NHS clinicians. Political and financial factors are now perceived to threaten nationwide implementation of electronic health records. Interviewees identified a range of consequences of long term, centrally negotiated contracts to deliver the NHS Care Records Service in secondary care, particularly as NHS trusts themselves are not party to these contracts. These include convoluted communication channels between different stakeholders, unrealistic deployment timelines, delays, and applications that could not quickly respond to changing national and local NHS priorities. Our data suggest support for a “middle-out” approach to implementing hospital electronic health records, combining government direction with increased local autonomy, and for restricting

  12. Comparison of Parallel and Series Hybrid Power Trains for Transit Bus Applications

    DOE PAGESBeta

    Gao, Zhiming; Daw, C. Stuart; Smith, David E.; LaClair, Tim J.; Parks, James E.; Jones, Perry T.

    2016-08-01

    The fuel economy and emissions of conventional and hybrid buses equipped with emissions after treatment were evaluated via computational simulation for six representative city bus drive cycles. Both series and parallel configurations for the hybrid case were studied. The simulation results indicated that series hybrid buses have the greatest overall advantage in fuel economy. The series and parallel hybrid buses were predicted to produce similar carbon monoxide and hydrocarbon tailpipe emissions but were also predicted to have reduced tailpipe emissions of nitrogen oxides compared with the conventional bus in higher speed cycles. For the New York bus cycle, which hasmore » the lowest average speed among the cycles evaluated, the series bus tailpipe emissions were somewhat higher than they were for the conventional bus; the parallel hybrid bus had significantly lower tailpipe emissions. All three bus power trains were found to require periodic active diesel particulate filter regeneration to maintain control of particulate matter. Finally, plug-in operation of series hybrid buses appears to offer significant fuel economy benefits and is easily employed because of the relatively large battery capacity that is typical of the series hybrid configuration.« less

  13. COMPARISON OF PARALLEL AND SERIES HYBRID POWERTRAINS FOR TRANSIT BUS APPLICATION

    SciTech Connect

    Gao, Zhiming; Daw, C Stuart; Smith, David E; Jones, Perry T; LaClair, Tim J; Parks, II, James E

    2016-01-01

    The fuel economy and emissions of both conventional and hybrid buses equipped with emissions aftertreatment were evaluated via computational simulation for six representative city bus drive cycles. Both series and parallel configurations for the hybrid case were studied. The simulation results indicate that series hybrid buses have the greatest overall advantage in fuel economy. The series and parallel hybrid buses were predicted to produce similar CO and HC tailpipe emissions but were also predicted to have reduced NOx tailpipe emissions compared to the conventional bus in higher speed cycles. For the New York bus cycle (NYBC), which has the lowest average speed among the cycles evaluated, the series bus tailpipe emissions were somewhat higher than they were for the conventional bus, while the parallel hybrid bus had significantly lower tailpipe emissions. All three bus powertrains were found to require periodic active DPF regeneration to maintain PM control. Plug-in operation of series hybrid buses appears to offer significant fuel economy benefits and is easily employed due to the relatively large battery capacity that is typical of the series hybrid configuration.

  14. Comparison of Parallel and Series Hybrid Powertrains for Transit Bus Application

    SciTech Connect

    Gao, Zhiming; Daw, C Stuart; Smith, David E; LaClair, Tim J; Parks, II, James E; Jones, Perry T

    2016-01-01

    The fuel economy and emissions of conventional and hybrid buses equipped with emissions aftertreatment were evaluated via computational simulation for six representative city bus drive cycles. Both series and parallel configurations for the hybrid case were studied. The simulation results indicated that series hybrid buses have the greatest overall advantage in fuel economy. The series and parallel hybrid buses were predicted to produce similar carbon monoxide and hydrocarbon tailpipe emissions but were also predicted to have reduced tailpipe emissions of nitrogen oxides compared with the conventional bus in higher speed cycles. For the New York bus cycle, which has the lowest average speed among the cycles evaluated, the series bus tailpipe emissions were somewhat higher than they were for the conventional bus; the parallel hybrid bus had significantly lower tailpipe emissions. All three bus power trains were found to require periodic active diesel particulate filter regeneration to maintain control of particulate matter. Plug-in operation of series hybrid buses appears to offer significant fuel economy benefits and is easily employed because of the relatively large battery capacity that is typical of the series hybrid configuration.

  15. Comparison of Parallel and Series Hybrid Powertrains for Transit Bus Application

    DOE PAGESBeta

    Gao, Zhiming; Daw, C Stuart; Smith, David E; LaClair, Tim J; Parks, II, James E; Jones, Perry T

    2016-01-01

    The fuel economy and emissions of conventional and hybrid buses equipped with emissions aftertreatment were evaluated via computational simulation for six representative city bus drive cycles. Both series and parallel configurations for the hybrid case were studied. The simulation results indicated that series hybrid buses have the greatest overall advantage in fuel economy. The series and parallel hybrid buses were predicted to produce similar carbon monoxide and hydrocarbon tailpipe emissions but were also predicted to have reduced tailpipe emissions of nitrogen oxides compared with the conventional bus in higher speed cycles. For the New York bus cycle, which has themore » lowest average speed among the cycles evaluated, the series bus tailpipe emissions were somewhat higher than they were for the conventional bus; the parallel hybrid bus had significantly lower tailpipe emissions. All three bus power trains were found to require periodic active diesel particulate filter regeneration to maintain control of particulate matter. Plug-in operation of series hybrid buses appears to offer significant fuel economy benefits and is easily employed because of the relatively large battery capacity that is typical of the series hybrid configuration.« less

  16. A new bus lane on urban expressway with no-bay bus stop

    NASA Astrophysics Data System (ADS)

    Tian, Zhao; Jia, Limin

    2016-01-01

    The sharp increase in residents and vehicles causes heavy traffic pressure in many cities. To ease traffic congestion, it has been the common sense that we should develop public transit system. The priority of the bus appears particularly necessary with the rapid development of the public transport system. The bus lane is an important embodiment of the bus priority. Focusing on the problem of the unreasonable dedicated bus lane (DBL) under the lower ratio of buses, this paper proposed a new bus lane with limited physical length. And this bus lane can reduce the lane-changing conflict caused by the buses and cars running on roads without bus lanes. Based on the cellular automata (CA) traffic flow model and the lane-changing behavior of the vehicle including the optional lane-changing and the mandatory lane-changing, a three-lane traffic model with an isolated no-bay bus stop is proposed. The ordinary three-lane traffic without a bus lane and the cases of traffic with a DBL or the proposed bus lane are simulated, and the comparisons in the form of the fundamental diagrams are made among them. It is shown that the no-bay bus stop can act as a bottleneck on the traffic flow because of the mandatory lane-changing behavior. Under a certain ratio of the bus number to the total vehicles number, (1) the traffic with the proposed bus lane has less lane-changing conflict and can provide higher traffic capacity than the ordinary traffic without a bus lane, (2) compared with the DBL, the proposed bus lane is advantageous in easing congestion on the ordinary lanes when the traffic flow is high and can avoid unreasonable allocation of the road resources.

  17. CMM Interim Check (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  18. Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants

    SciTech Connect

    Mays, Gary T; Belles, Randy; Cetiner, Sacit M; Howard, Rob L; Liu, Cheng; Mueller, Don; Omitaomu, Olufemi A; Peterson, Steven K; Scaglione, John M

    2012-06-01

    The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

  19. Connecting Separate Computers to a Common Bus

    NASA Technical Reports Server (NTRS)

    Agrawan, A. K.; Mullen, P. G.; Vadakan, V. V.

    1984-01-01

    Network bus adapter (NBA) handles protocols for computer-tocomputer communications. NBA does all protocol handling and communications with bus for its host computer, that processor of different speeds sends data to each other continuously at maximum speed. Any host can communicate with any other, or several or with all.

  20. Priority Queuing On A Parallel Data Bus

    NASA Technical Reports Server (NTRS)

    Wallis, D. E.

    1985-01-01

    Queuing strategy for communications along shared data bus minimizes number of data lines while always assuring user of highest priority given access to bus. New system handles up to 32 user demands on 17 data lines that previously serviced only 17 demands.

  1. School Bus Maintenance. Bulletin, 1948, No. 2

    ERIC Educational Resources Information Center

    Featherston, E. Glenn

    1948-01-01

    This bulletin is one in the series on pupil transportation issued by the Office of Education. Its purpose is to furnish information and guidance for local school administrators and others who are concerned with school bus maintenance. Programs of school bus maintenance vary among the 48 States. Presumably all contract vehicles are maintained by…

  2. Alternative Fuel School Bus Information Resources

    SciTech Connect

    Not Available

    2004-04-01

    This 4-page Clean Cities fact sheet provides a list of important resources for learning more about alternative fuels in school buses. It includes information regarding Alternative Fuel School Bus Manufacturers, Alternative Fuel HD Engine Manufacturers, Alternative Fuel School Bus Operators, and Key Web Resources for Alternative Fuels.

  3. Two Innovations in Bus Driver Training

    ERIC Educational Resources Information Center

    School Management, 1972

    1972-01-01

    Discusses driver and human relations training for school bus drivers. A driver training program in California aims at reaching all 19,000 school bus drivers. A human relations training program in Seattle focuses on bettering student-driver and driver-administrator relations. (DN)

  4. How Parents Can Promote School Bus Safety.

    ERIC Educational Resources Information Center

    Tofany, Vincent L.

    1982-01-01

    The president of the National Safety Council suggests ways that parents can promote school bus safety, with emphasis on preventing accidents outside the bus. Parents can explain safety rules to their children and work with their parent teacher associations and school administrators to plan and enforce safety regulations. (PP)

  5. School Bus Safety Education: A Comprehensive Approach.

    ERIC Educational Resources Information Center

    Vaglia, Jim

    1991-01-01

    A Virginia school district has developed a curriculum of school bus safety objectives for each grade level (K-6). Produced as a complete package, the curriculum contains a lesson plan, expected outcomes, a listing of instructional aids, defined activities, and required student materials. Lists bus safety rules that are taught and those posted on…

  6. Hidden Savings in your Bus Budget

    ERIC Educational Resources Information Center

    Newby, Ruth

    2005-01-01

    School transportation industry statistics show the annual average costs for operating and maintaining a single school bus range from $34,000 to $38,000. Operating a school bus fleet at high efficiency has a real impact on the dollars saved for a school district and the reliability of transportation service to students. In this article, the author…

  7. Interprocessor bus switching system for simultaneous communication in plural bus parallel processing system

    DOEpatents

    Atac, Robert; Fischler, Mark S.; Husby, Donald E.

    1991-01-01

    A bus switching apparatus and method for multiple processor computer systems comprises a plurality of bus switches interconnected by branch buses. Each processor or other module of the system is connected to a spigot of a bus switch. Each bus switch also serves as part of a backplane of a modular crate hardware package. A processor initiates communication with another processor by identifying that other processor. The bus switch to which the initiating processor is connected identifies and secures, if possible, a path to that other processor, either directly or via one or more other bus switches which operate similarly. If a particular desired path through a given bus switch is not available to be used, an alternate path is considered, identified and secured.

  8. Interprocessor bus switching system for simultaneous communication in plural bus parallel processing system

    DOEpatents

    Atac, R.; Fischler, M.S.; Husby, D.E.

    1991-01-15

    A bus switching apparatus and method for multiple processor computer systems comprises a plurality of bus switches interconnected by branch buses. Each processor or other module of the system is connected to a spigot of a bus switch. Each bus switch also serves as part of a backplane of a modular crate hardware package. A processor initiates communication with another processor by identifying that other processor. The bus switch to which the initiating processor is connected identifies and secures, if possible, a path to that other processor, either directly or via one or more other bus switches which operate similarly. If a particular desired path through a given bus switch is not available to be used, an alternate path is considered, identified and secured. 11 figures.

  9. Transforming Writing: Interim Evaluation Report

    ERIC Educational Resources Information Center

    Rooke, Jonathan

    2012-01-01

    Transforming Writing is a two-year action research project which aims to develop a model for the teaching and learning of writing that more fully incorporates a focus on embedded formative assessment. In the first year of the project, the 12 participating schools developed a model of writing underpinned by Talk for Writing, an approach developed…

  10. Characterisation of an urban bus network for environmental purposes.

    PubMed

    André, Michel; Villanova, André

    2004-12-01

    Since pollutant emissions are closely related to the operating conditions of vehicles, their evaluation usually involves studying these operating conditions (through bus instrumentation and monitoring under actual operation), the design of representative driving or engine test cycles and the measurement of pollutant emissions. A preliminary characterisation of the routes on a bus network should make it possible to identify typical routes, the driving conditions and pollutant emissions of which are then studied. Two approaches are envisaged and applied to the Paris area, for which a wealth of information is available, which should be transferable to other bus networks. Both approaches are based on factorial analysis and automatic clustering, to allow optimum description and the identification of a pertinent typology of the bus routes in several classes. The first attempt at characterisation is based on statistics relating to bus operations: route characteristics (length, dedicated bus lanes, number of stops, location of stops: schools, tourist sites, hospitals, railways or underground stations), travel time, commercial speed, annual statistics (number of passengers, number of vehicles per hour, total kilometres), the irregularity of travel (variation of travel times, injuries, congestion.), as well as information on the problems encountered (congestion, distribution of the passenger load, junctions, bends). A second approach is based on the analysis of the "urban context" in which buses are driven. Population, employment, housing, road network, traffic and places that generate or disturb traffic (schools, railway stations, shopping areas, etc.) are calculated for the Ile de France region, by cells of 100 x 100 m, and collected in a geographical information system (GIS). Statistical analyses enable a typology of these urban cells to be established, the main parameters being density, type of housing, road types and traffic levels. The bus routes are then analysed

  11. GeoBus: sharing science research with schools

    NASA Astrophysics Data System (ADS)

    Roper, Kathryn; Robinson, Ruth; Moorhouse, Ben

    2016-04-01

    GeoBus (www.geobus.org.uk) is an educational outreach project that was developed in 2012 by the Department of Earth and Environmental Sciences at the University of St Andrews, and it is currently sponsored by industry, NERC, The Crown Estate, and the Scottish Government. The aims of GeoBus are to support the teaching of Earth Science in secondary (middle and high) schools by providing teaching support to schools that have little or no experience in teaching this subject. This is, in part, done through the sharing of new science research outcomes and the experiences of young researchers with school pupils to provide a bridge between industry, higher education institutions, research councils and schools. Since its launch, over 40,000 pupils will have been involved in experiential Earth science learning activities in 190 different schools (over 400 separate visits) across the length and breadth of Scotland: many of these schools are in remote and disadvantaged regions. A new GeoBus project is under development within the Department of Earth Sciences at UCL in London. A key aim of GeoBus is to incorporate new research into our workshops with the main challenge being the development of appropriate resources that incorporate the key learning aims and requirements of the science and geography curricula. GeoBus works closely with researchers, teachers and educational practitioners to tailor the research outcomes to the curricula as much as possible. Over the past four years, GeoBus has developed 17 workshops, 5 challenge events and extensive field trips and each of these activities are trialled and evaluated within the university, and adjustments are made before the activities are delivered in schools. Activities are continually reviewed and further developments are made in response to both teacher and pupil feedback. This critical reflection of the project's success and impact is important to insure a positive and significant contribution to the science learning in

  12. Bus Stops and Pedestrian-Motor Vehicle Collisions in Lima, Peru: A Matched Case-Control Study

    PubMed Central

    Quistberg, D. Alex; Koepsell, Thomas D.; Johnston, Brian D.; Boyle, Linda Ng; Miranda, J. Jaime; Ebel, Beth E.

    2015-01-01

    Objective To evaluate the relationship between bus stop characteristics and pedestrian-motor vehicle collisions. Design Matched case-control study where the units of study were pedestrian crossing. Setting Random sample of 11 police commissaries in Lima, Peru. Data collection occurred from February, 2011 to September, 2011. Participants 97 intersection cases representing 1,134 collisions and 40 mid-block cases representing 469 collisions that occurred between October, 2010 and January, 2011 and their matched controls. Main Exposures Presence of a bus stop and specific bus stop characteristics. Main Outcome Occurrence of a pedestrian-motor vehicle collision. Results Intersections with bus stops were three times more likely to have a pedestrian-vehicle collision (OR 3.28, 95% CI 1.53-7.03), relative to intersections without bus stops. Both formal and informal bus stops were associated with a higher odds of a collision at intersections (OR 6.23, 95% CI 1.76-22.0 and OR 2.98, 1.37-6.49). At mid-block sites, bus stops on a bus-dedicated transit lane were also associated with collision risk (OR 2.36, 95% CI 1.02-5.42). All bus stops were located prior to the intersection, contrary to practices in most high income countries. Conclusions In urban Lima, the presence of a bus stop was associated with a three-fold increase in risk of a pedestrian collision. The highly competitive environment among bus companies may provide an economic incentive for risky practices such as dropping off passengers in the middle of traffic and jockeying for position with other buses. Bus stop placement should be considered to improve pedestrian safety. PMID:24357516

  13. Determinants of exposure to fine particulate matter (PM 2.5) for waiting passengers at bus stops

    NASA Astrophysics Data System (ADS)

    Hess, Daniel Baldwin; Ray, Paul David; Stinson, Anne E.; Park, JiYoung

    2010-12-01

    This research evaluates commuter exposure to particulate matter during pre-journey commute segments for passengers waiting at bus stops by investigating 840 min of simultaneous exposure levels, both inside and outside seven bus shelters in Buffalo, New York. A multivariate regression model is used to estimate the relation between exposure to particulate matter (PM 2.5 measured in μg m -3) and three vectors of determinants: time and location, physical setting and placement, and environmental factors. Four determinants have a statistically significant effect on particulate matter: time of day, passengers' waiting location, land use near the bus shelter, and the presence of cigarette smoking at the bus shelter. Model results suggest that exposure to PM 2.5 inside a bus shelter is 2.63 μg m -3 (or 18 percent) higher than exposure outside a bus shelter, perhaps due in part to the presence of cigarette smoking. Morning exposure levels are 6.51 μg m -3 (or 52 percent) higher than afternoon levels. Placement of bus stops can affect exposure to particulate matter for those waiting inside and outside of shelters: air samples at bus shelters located in building canyons have higher particulate matter than bus shelters located near open space.

  14. Analog bus driver and multiplexer

    NASA Technical Reports Server (NTRS)

    Pain, Bedabrata (Inventor); Hancock, Bruce (Inventor); Cunningham, Thomas J. (Inventor)

    2012-01-01

    For a source-follower signal chain, the ohmic drop in the selection switch causes unacceptable voltage offset, non-linearity, and reduced small signal gain. For an op amp signal chain, the required bias current and the output noise rises rapidly with increasing the array format due to a rapid increase in the effective capacitance caused by the Miller effect boosting up the contribution of the bus capacitance. A new switched source-follower signal chain circuit overcomes limitations of existing op-amp based or source follower based circuits used in column multiplexers and data readout. This will improve performance of CMOS imagers, and focal plane read-out integrated circuits for detectors of infrared or ultraviolet light.

  15. Eastside, Westside... An Exercise in Applying Document Analysis Techniques in Educational Evaluation. Research on Evaluation Program Paper and Report Series. No. 78. Interim Draft.

    ERIC Educational Resources Information Center

    Garman, Keats

    This booklet is about document analysis and its utility as a method in education evaluation, and is intended for evaluators in local school districts, regional education agencies, and state departments of education. Document analysis is described as a technique that relies heavily upon a variety of written materials for data, insights, and…

  16. Some Contributions of General Systems Theory, Cybernetics Theory and Management Control Theory to Evaluation Theory and Practice. Research on Evaluation Program Paper and Report Series. Interim Draft.

    ERIC Educational Resources Information Center

    Cook, Desmond L.

    This document, one of a series of reports examining the possible contribution of other disciplines to evaluation methodology, describes the major elements of general systems theory (GST), cybernetics theory (CT) and management control theory (MCT). The author suggests that MCT encapsulates major concerns of evaluation since it reveals that…

  17. Verification of the new ECMWF ERA-Interim reanalysis over France

    NASA Astrophysics Data System (ADS)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2011-02-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 27%. A GPCP-corrected version of ERA-Interim is less biased (13%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6 Wm-2, ERA-Interim overestimates the ISR by 10 Wm-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  18. Verification of the new ECMWF ERA-Interim reanalysis over France

    NASA Astrophysics Data System (ADS)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2010-09-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 26%. A GPCP-corrected version of ERA-Interim is less biased (10-15%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6-8 W m-2, ERA-Interim overestimates the ISR by 9-10 W m-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  19. Interim storage study report

    SciTech Connect

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  20. Radiation-Tolerant Dual Data Bus

    NASA Technical Reports Server (NTRS)

    Kinstler, Gary A.

    2007-01-01

    An architecture, and a method of utilizing the architecture, have been proposed to enable error-free operation of a data bus that includes, and is connected to, commercial off-the-shelf (COTS) circuits and components that are inherently susceptible to singleevent upsets [SEUs (bit flips caused by impinging high-energy particles and photons)]. The architecture and method are applicable, more specifically, to data-bus circuitry based on the Institute for Electrical and Electronics Engineers (IEEE) 1394b standard for a high-speed serial bus.

  1. Study of the impact of automation on productivity in bus-maintenance facilities. Final report

    SciTech Connect

    Sumanth, D.J.; Weiss, H.J.; Adya, B.

    1988-12-01

    Whether or not the various types of automation and new technologies introduced in a bus-transit system really have an impact on productivity is the question addressed in the study. The report describes a new procedure of productivity measurement and evaluation for a county-transit system and provides an objective perspective on the impact of automation on productivity in bus maintenance facilities. The research objectives were: to study the impact of automation on total productivity in transit maintenance facilities; to develop and apply a methodology for measuring the total productivity of a Floridian transit maintenance facility (Bradenton-Manatee County bus maintenance facility which has been introducing automation since 1983); and to develop a practical step-by-step implementation scheme for the total productivity-based productivity measurement system that any bus manager can use. All 3 objectives were successfully accomplished.

  2. 49 CFR 605.19 - Approval of school bus operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Approval of school bus operations. 605.19 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.19 Approval of school bus operations. (a) The Administrator will consider the comments filed by private school...

  3. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    SciTech Connect

    CALMUS, R.B.

    1999-05-18

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward.

  4. Computerized Bus Routing in San Francisco.

    ERIC Educational Resources Information Center

    Caswell, Peter J.; Jungherr, J. Anton

    1979-01-01

    A computerized routing and scheduling system for the San Francisco Public Schools includes the batch processing of bus route assignments and schedules for all schools and the online terminal processing of daily changes. (Author/MLF)

  5. The Impact on Traffic Safety in Bus Stop

    NASA Astrophysics Data System (ADS)

    Zhang, Kailun; Guang, Xiaoping; Qian, Yongsheng

    The article improves the attraction of public transportation system when the safety is taken into account during the selection of bus stops. In this paper, the characteristics of traffic conflict at bus stops is analyzed from various types of bus stops and the applicability of bus stations is proposed in comply with provisions of security. It has a certain reference value on selection of bus stops.

  6. A software bus for thread objects

    NASA Technical Reports Server (NTRS)

    Callahan, John R.; Li, Dehuai

    1995-01-01

    The authors have implemented a software bus for lightweight threads in an object-oriented programming environment that allows for rapid reconfiguration and reuse of thread objects in discrete-event simulation experiments. While previous research in object-oriented, parallel programming environments has focused on direct communication between threads, our lightweight software bus, called the MiniBus, provides a means to isolate threads from their contexts of execution by restricting communications between threads to message-passing via their local ports only. The software bus maintains a topology of connections between these ports. It routes, queues, and delivers messages according to this topology. This approach allows for rapid reconfiguration and reuse of thread objects in other systems without making changes to the specifications or source code. A layered approach that provides the needed transparency to developers is presented. Examples of using the MiniBus are given, and the value of bus architectures in building and conducting simulations of discrete-event systems is discussed.

  7. Fuel cell transit bus development & commercialization programs at Gerogetown University

    SciTech Connect

    Wimmer, R.; Larkins, J.; Romano, S.

    1996-12-31

    Fourteen years ago, Georgetown University (GU) perceived the need for a clean, efficient power systems for transportation that could operate on non-petroleum based fuels. The transit bus application was selected to begin system development. GU recognized the range and recharge constraints of a pure battery powered transit bus. A Fuel Cell power system would circumvent these limitations and, with an on board reformer, accommodate liquid fuel for rapid refueling. Feasibility studies for Fuel Cell power systems for transit buses were conducted with the Los Alamos National Laboratory in 1983. Successful results of this investigation resulted in the DOT/DOE Fuel Cell transit bus development program. The first task was to prove that small Fuel Cell power plants were possible. This was achieved with the Phase I development of two 25 kW Phosphoric Acid Fuel Cell (PAFC) brassboard systems. A liquid cooled version was selected for the Phase II activity in which three 30-foot Fuel Cell powered Test Bed Buses (TBBs) were fabricated. The first of these TBBs was delivered in the spring of 1994. All three of these development vehicles are now in Phase III of the program to conduct testing and evaluation, is conducting operational testing of the buses. The test will involve two fuel cell-operated buses; one with a proton exchange fuel cell and the other with a phosphoric acid fuel cell.

  8. Violence against metropolitan bus drivers and fare collectors in Brazil

    PubMed Central

    Assunção, Ada Ávila; de Medeiros, Adriane Mesquita

    2015-01-01

    OBJECTIVE To analyze the correlation between sociodemographic factors and working conditions of bus workers in a metropolitan area and violence against them. METHODS This cross-sectional study used a nonprobabilistic sample estimated according to the number of workers employed in bus companies located in three cities in the Belo Horizonte metropolitan region in 2012 (N = 17,470). Face-to-face interviews were conducted using a digital questionnaire. The factors associated with violence were analyzed in two stages using Poisson regression, according to each level. The magnitude of the association was evaluated using prevalence ratios with robust variance and a statistical significance of 5%, and 95% confidence intervals were obtained. RESULTS The study sample comprised 782 drivers and 691 fare collectors; 45.0% participants reported at least one act of violence in the workplace in the last 12 months, with passengers being predominantly responsible. The age of the bus workers was inversely associated with violence. Chronic diseases, sickness absenteeism, and working conditions were also associated with violence. CONCLUSIONS The findings on the correlation between violence and working conditions are essential for implementing prevention strategies by transportation service managers. PMID:25741657

  9. Violence against metropolitan bus drivers and fare collectors in Brazil.

    PubMed

    Assunção, Ada Ávila; Medeiros, Adriane Mesquita de

    2015-01-01

    OBJECTIVE To analyze the correlation between sociodemographic factors and working conditions of bus workers in a metropolitan area and violence against them. METHODS This cross-sectional study used a nonprobabilistic sample estimated according to the number of workers employed in bus companies located in three cities in the Belo Horizonte metropolitan region in 2012 (N = 17,470). Face-to-face interviews were conducted using a digital questionnaire. The factors associated with violence were analyzed in two stages using Poisson regression, according to each level. The magnitude of the association was evaluated using prevalence ratios with robust variance and a statistical significance of 5%, and 95% confidence intervals were obtained. RESULTS The study sample comprised 782 drivers and 691 fare collectors; 45.0% participants reported at least one act of violence in the workplace in the last 12 months, with passengers being predominantly responsible. The age of the bus workers was inversely associated with violence. Chronic diseases, sickness absenteeism, and working conditions were also associated with violence. CONCLUSIONS The findings on the correlation between violence and working conditions are essential for implementing prevention strategies by transportation service managers. PMID:25741657

  10. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem

    PubMed Central

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods. PMID:26176764

  11. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem.

    PubMed

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods. PMID:26176764

  12. Evaluation of Cloud Physical Properties of ECMWF Analysis and Re-Analysis (ERA-40 and ERA Interim) against CERES Tropical Deep Convective Cloud Object Observations

    NASA Technical Reports Server (NTRS)

    Xu, Kuan-Man

    2008-01-01

    This study presents an approach that converts the vertical profiles of grid-averaged cloud properties from large-scale models to probability density functions (pdfs) of subgrid-cell cloud physical properties measured at satellite footprints. Cloud physical and radiative properties, rather than just cloud and precipitation occurrences, of assimilated cloud systems by the European Center for Medium-range Weather Forecasts (ECMWF) operational analysis (EOA) and ECMWF Re-Analyses (ERA-40 and ERA Interim) are validated against those obtained from Earth Observing System satellite cloud object data for January-August 1998 and March 2000 periods. These properties include ice water path (IWP), cloud-top height and temperature, cloud optical depth and solar and infrared radiative fluxes. Each cloud object, a contiguous region with similar cloud physical properties, is temporally and spatially matched with EOA and ERA-40 data. Results indicate that most pdfs of EOA and ERA-40 cloud physical and radiative properties agree with those of satellite observations of the tropical deep convective cloud-object type for the January-August 1998 period. There are, however, significant discrepancies in selected ranges of the cloud property pdfs such as the upper range of EOA cloud top height. A major discrepancy is that the dependence of the pdfs on the cloud object size for both EOA and ERA-40 is not as strong as in the observations. Modifications to the cloud parameterization in ECMWF that occurred in October 1999 eliminate the clouds near the tropopause but shift power of the pdf to lower cloud-top heights and greatly reduce the ranges of IWP and cloud optical depth pdfs. These features persist in ERA-40 due to the use of the same cloud parameterizations. The downgrade of data assimilation technique and the lack of snow water content information in ERA-40, not the coarser horizontal grid resolution, are also responsible for the disagreements with observed pdfs of cloud physical

  13. Dynamic Bus Travel Time Prediction Models on Road with Multiple Bus Routes

    PubMed Central

    Bai, Cong; Peng, Zhong-Ren; Lu, Qing-Chang; Sun, Jian

    2015-01-01

    Accurate and real-time travel time information for buses can help passengers better plan their trips and minimize waiting times. A dynamic travel time prediction model for buses addressing the cases on road with multiple bus routes is proposed in this paper, based on support vector machines (SVMs) and Kalman filtering-based algorithm. In the proposed model, the well-trained SVM model predicts the baseline bus travel times from the historical bus trip data; the Kalman filtering-based dynamic algorithm can adjust bus travel times with the latest bus operation information and the estimated baseline travel times. The performance of the proposed dynamic model is validated with the real-world data on road with multiple bus routes in Shenzhen, China. The results show that the proposed dynamic model is feasible and applicable for bus travel time prediction and has the best prediction performance among all the five models proposed in the study in terms of prediction accuracy on road with multiple bus routes. PMID:26294903

  14. Dynamic Bus Travel Time Prediction Models on Road with Multiple Bus Routes.

    PubMed

    Bai, Cong; Peng, Zhong-Ren; Lu, Qing-Chang; Sun, Jian

    2015-01-01

    Accurate and real-time travel time information for buses can help passengers better plan their trips and minimize waiting times. A dynamic travel time prediction model for buses addressing the cases on road with multiple bus routes is proposed in this paper, based on support vector machines (SVMs) and Kalman filtering-based algorithm. In the proposed model, the well-trained SVM model predicts the baseline bus travel times from the historical bus trip data; the Kalman filtering-based dynamic algorithm can adjust bus travel times with the latest bus operation information and the estimated baseline travel times. The performance of the proposed dynamic model is validated with the real-world data on road with multiple bus routes in Shenzhen, China. The results show that the proposed dynamic model is feasible and applicable for bus travel time prediction and has the best prediction performance among all the five models proposed in the study in terms of prediction accuracy on road with multiple bus routes. PMID:26294903

  15. Bullying and Aggression on the School Bus: School Bus Drivers' Observations and Suggestions

    ERIC Educational Resources Information Center

    deLara, Ellen

    2008-01-01

    Every school day bus drivers are responsible for transporting children safely over many miles, yet they are rarely polled for their opinions or contributions to school safety. School bus drivers are in a unique position to inform the discussion on aggressive behavior during the school day. This exploratory study collected information from school…

  16. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    SciTech Connect

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  17. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a limited time…

  18. [Tuberculosis microepidemic in a commuter bus].

    PubMed

    Yagi, T; Sasaki, Y; Yamagishi, F; Mizutani, F; Wada, A; Kuroda, F

    1999-06-01

    A tuberculosis microepidemic in a commuter bus was reported. Index patient was a 22-year-old woman who was an employee of an electronic company. An abnormal shadow was found on her chest roentgenogram during an annual medical check-up in June, 1996. As her sputum smear was Gaffky 6, she was admitted to our hospital for medication. Extraordinary examinations including PPD skin test and chest X-ray were carried out on 49 employees of the company in October, 1996. As the result of these examinations, the distribution of maximum diameters of erythema in PPD skin test showed bimodal distribution, and tuberculosis was discovered in two patients by Chest X-ray examination. Moreover, preventive administration of Isonicotinic acid hydrazide (INH) was indicated for 3 employees based on very strong skin reaction to PPD. These five employees were working separately from the index patient and had little contact with the patient in the work places, but using a same commuter bus. Therefore, we strongly suspect that they were infected from the index patient not in the work place but in the commuter bus. The air-conditioning of the bus used a closed recirculation system, hence insufficient ventilation in the bus contributed to the spread of tuberculosis infection. PMID:10423962

  19. Factors affecting the probability of bus drivers being at-fault in bus-involved accidents.

    PubMed

    Goh, Kelvin; Currie, Graham; Sarvi, Majid; Logan, David

    2014-05-01

    Previous research has provided little insight into factors that influence the probability of bus drivers being at-fault in bus-involved accidents. In this study, an analysis was conducted on accident data compiled by a bus company that include an assessment on whether the bus driver was deemed by the company to hold primary responsibility for accident occurrence. Using a mixed logit modelling approach, roadway/environmental, vehicle and driver related variables that were identified to be influential were road type, speed limit, traffic/lighting conditions, bus priority, bus age/length and driver's age/gender/experience/historic at-fault accident record. Results were indicative of possible confined road-space issues that bus drivers face along routes with roadside traffic friction and point to the provision of exclusive right of way for buses as a possible way to address this. Results also suggest benefits in assigning routes comprising mainly divided roads as well as newer and shorter buses to less experienced drivers. PMID:24486771

  20. Realization and optimization of bus bar current transducers based on Hall effect sensors

    NASA Astrophysics Data System (ADS)

    Blagojević, Marjan; Jovanović, Uglješa; Jovanović, Igor; Mančić, Dragan; Popović, Radivoje S.

    2016-06-01

    In this paper the realization and optimization of two coreless open-loop bus bar current transducers based on a Hall effect sensor are presented. Two types of bus bar are evaluated: flat rectangular and rectangular with a restrictive region in the middle. Both realized transducers are capable of measuring AC and DC currents up to 300 A and 10 kHz frequency with nonlinearity less than 0.3% in the entire range. Several methods for resolving issues with the skin effect and stray magnetic fields are presented along with the experimental test results. Some of the presented methods are novel and have never been evaluated.

  1. Risk factors affecting fatal bus accident severity: Their impact on different types of bus drivers.

    PubMed

    Feng, Shumin; Li, Zhenning; Ci, Yusheng; Zhang, Guohui

    2016-01-01

    While the bus is generally considered to be a relatively safe means of transportation, the property losses and casualties caused by bus accidents, especially fatal ones, are far from negligible. The reasons for a driver to incur fatalities are different in each case, and it is essential to discover the underlying risk factors of bus fatality severity for different types of drivers in order to improve bus safety. The current study investigates the underlying risk factors of fatal bus accident severity to different types of drivers in the U.S. by estimating an ordered logistic model. Data for the analysis are retrieved from the Buses Involved in Fatal Accidents (BIFA) database from the USA for the years 2006-2010. Accidents are divided into three levels by counting their equivalent fatalities, and the drivers are classified into three clusters by the K-means cluster analysis. The analysis shows that some risk factors have the same impact on different types of drivers, they are: (a) season; (b) day of week; (c) time period; (d) number of vehicles involved; (e) land use; (f) manner of collision; (g) speed limit; (h) snow or ice surface condition; (i) school bus; (j) bus type and seating capacity; (k) driver's age; (l) driver's gender; (m) risky behaviors; and (n) restraint system. Results also show that some risk factors only have impact on the "young and elder drivers with history of traffic violations", they are: (a) section type; (b) number of lanes per direction; (c) roadway profile; (d) wet road surface; and (e) cyclist-bus accident. Notably, history of traffic violations has different impact on different types of bus drivers. PMID:26513334

  2. The crew activity planning system bus interface unit

    NASA Technical Reports Server (NTRS)

    Allen, M. A.

    1979-01-01

    The hardware and software designs used to implement a high speed parallel communications interface to the MITRE 307.2 kilobit/second serial bus communications system are described. The primary topic is the development of the bus interface unit.

  3. This Bus Safety Plan Emphasizes Student Awareness and Driver Training.

    ERIC Educational Resources Information Center

    Grier, Terry B.

    1986-01-01

    School bus safety includes the development of safe drivers as well as student awareness. Outlines the McDowell County schools' (North Carolina) bus safety program. Includes discussion of whether high school students should drive school buses. (MD)

  4. 214. RUSTIC BUS SHELTER, GUARDRAILS AND LAMP POST BELLE HAVEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    214. RUSTIC BUS SHELTER, GUARDRAILS AND LAMP POST BELLE HAVEN BUS STOP WIDENING, 1932. - George Washington Memorial Parkway, Along Potomac River from McLean to Mount Vernon, VA, Mount Vernon, Fairfax County, VA

  5. EMCS Retrofit Analysis - Interim Report

    SciTech Connect

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  6. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Identification-bus and driver. 374.317 Section 374...—bus and driver. Each bus and driver providing service shall be identified in a manner visible to passengers. The driver may be identified by name or company number....

  7. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Identification-bus and driver. 374.317 Section 374...—bus and driver. Each bus and driver providing service shall be identified in a manner visible to passengers. The driver may be identified by name or company number....

  8. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Identification-bus and driver. 374.317 Section 374...—bus and driver. Each bus and driver providing service shall be identified in a manner visible to passengers. The driver may be identified by name or company number....

  9. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Identification-bus and driver. 374.317 Section 374...—bus and driver. Each bus and driver providing service shall be identified in a manner visible to passengers. The driver may be identified by name or company number....

  10. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Identification-bus and driver. 374.317 Section 374...—bus and driver. Each bus and driver providing service shall be identified in a manner visible to passengers. The driver may be identified by name or company number....

  11. Energy DataBus (Fact Sheet)

    SciTech Connect

    Not Available

    2013-07-01

    NREL has developed the Energy DataBus, an open-sourced software that collects massive amounts of energy-related data at second-to-second intervals; stores it in a massive, scalable database; and turns it into useful information.

  12. School Bus Accidents: Reducing Incidents and Injuries

    ERIC Educational Resources Information Center

    Mahoney, Daniel

    2009-01-01

    The number of children injured in nonfatal school bus accidents annually is more than double the number previously estimated. In Ohio alone, approximately 20,800 children younger than 18 were occupants of school buses that were involved in crashes in 2003 and 2004 (McGeehan 2007). Among those children, most had minor or no injuries. However, there…

  13. Bus Maintenance is a Sound Investment.

    ERIC Educational Resources Information Center

    American School Board Journal, 1981

    1981-01-01

    Preventive school bus maintenance to reduce long-term costs should include daily visual inspections by drivers, frequent checks by mechanics, and comprehensive inspections every 5,000 miles. Mechanics recommend checking tail lights, batteries, brakes, lug nuts, leaf springs, tail pipes, and exhaust pipe hangers. (RW)

  14. FUEL CELL BUS DEMONSTRATION IN MEXICO CITY

    EPA Science Inventory

    The report discusses the performance of a cull-size, zero-emission, Proton Exchange Membrane (PEM) fuel-cell-powered transit bus in the atmospheric environment of Mexico City. To address the air quality problems caused by vehicle emissions in Mexico City, a seminar on clean vehic...

  15. Mission Services Evolution Center Message Bus

    NASA Technical Reports Server (NTRS)

    Mayorga, Arturo; Bristow, John O.; Butschky, Mike

    2011-01-01

    The Goddard Mission Services Evolution Center (GMSEC) Message Bus is a robust, lightweight, fault-tolerant middleware implementation that supports all messaging capabilities of the GMSEC API. This architecture is a distributed software system that routes messages based on message subject names and knowledge of the locations in the network of the interested software components.

  16. Advanced Competencies for School Bus Drivers.

    ERIC Educational Resources Information Center

    Illinois State Board of Education, Springfield.

    Four units are provided for formal classroom instruction in advanced competencies for school bus drivers in Illinois. Units cover passenger control, accidents and emergencies, detecting hazards, and first aid. Each unit contains some or all of the following components: table of contents; a list of objectives; informative material, including an…

  17. Repeater For A Digital-Communication Bus

    NASA Technical Reports Server (NTRS)

    Torres-Guzman, Esteban; Olson, Stephen; Heaps, Tim

    1993-01-01

    Digital repeater circuit designed to extend range of communication on MIL-STD-1553 bus beyond original maximum allowable length of 300 ft. Circuit provides two-way communication, one way at time, and conforms to specifications of MIL-STD-1553. Crosstalk and instability eliminated.

  18. Central waste complex interim operational safety requirements

    SciTech Connect

    Bendixsen, R.B.; Ames, R.R., Fluor Daniel Hanford

    1997-03-20

    This Interim Operational Safety Requirements document supports the authorization basis for interim operations and identifies restrictions on interim operations for the disposal and storage of solid waste in the Central Waste Complex. The Central Waste Complex Interim Operational Safety Requirements provide the necessary controls on operations in the Central Waste Complex to ensure the radiological and hazardous material exposure will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, 1327 the public and the environment.

  19. Bus 54 -- Where are you? A school bus intelligent information system

    SciTech Connect

    Truett, L.F.; Moore, S.; Tonn, B.; Conley, T.

    1998-07-01

    Although major accidents involving school buses are rare (only about 0.3% of all fatal crashes since 1986 are classified as school-bus-related), even minor accidents and breakdowns cause a great deal of parental anxiety. The objective of this research is to design an efficient, cost-effective, accurate, and secure system that will track individual school buses and communicate appropriate information to the school system`s central administration unit, to the school transportation administrator, and to parents of children on the bus. The greatest benefit of the proposed information system is that parents and officials can always know the location and condition (these conditions would vary depending on the needs of a particular school system) of the school buses. In case of an accident or mechanical problem, when emergency crews are needed, they can be dispatched almost immediately with a good understanding of the problem and the exact location of the bus. In addition to being able to track the bus while the child is on board, parents will be able to determine the location of their child`s bus prior to its arrival in the morning in order to prevent the child from needing to wait outside in inclement weather. The information available to parents can also be expanded to include maps of limited routes (e.g., snow routes). Basically, the Bus 54 concept consists of a bus component and a central data processing unit. Each bus will be outfitted with a global positioning satellite (GPS) device, a wireless communication device, and wireless data communication service. The central data processing unit will receive and process information from the buses and provide information access to parents and officials via an Internet link.

  20. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  1. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  2. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  3. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  4. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  5. An Interim President Sets the Stage

    ERIC Educational Resources Information Center

    Guardo, Carol J.

    2006-01-01

    An interim president often plays a crucial role in leading a college or university. In some instances, the interim can address and resolve troublesome issues and thus clear the way for the new president to generate progress. In others, the interim stays the course so that the institution maintains its momentum and seizes strategic opportunities to…

  6. Performance of school bus retrofit systems: ultrafine particles and other vehicular pollutants.

    PubMed

    Zhang, Qunfang; Zhu, Yifang

    2011-08-01

    This study evaluated the performance of retrofit systems for diesel-powered school buses, a diesel oxidation catalyst (DOC) muffler and a spiracle crankcase filtration system (CFS), regarding ultrafine particles (UFPs) and other air pollutants from tailpipe emissions and inside bus cabins. Tailpipe emissions and in-cabin air pollutant levels were measured before and after retrofitting when the buses were idling and during actual pick-up/drop off routes. Retrofit systems significantly reduced tailpipe emissions with a reduction of 20-94% of total particles with both DOC and CFS installed. However, no unequivocal decrease was observed for in-cabin air pollutants after retrofitting. The AC/fan unit and the surrounding air pollutant concentrations played more important roles for determining the in-cabin air quality of school buses than did retrofit technologies. Although current retrofit systems reduce children's exposure while waiting to board at a bus station, retrofitting by itself does not protect children satisfactorily from in-cabin particle exposures. Turning on the bus engine increased in-cabin UFP levels significantly only when the wind blew from the bus' tailpipe toward its hood with its windows open. This indicated that wind direction and window position are significant factors determining how much self-released tailpipe emissions may penetrate into the bus cabin. The use of an air purifier was found to remove in-cabin particles by up to 50% which might be an alternative short-to-medium term strategy to protect children's health. PMID:21710985

  7. Study of the Voluntary Public School Choice Program. Interim Report

    ERIC Educational Resources Information Center

    Yin, Robert K.; Ahonen, Pirkko; Kim, Dawn

    2007-01-01

    The purpose of the Voluntary Public School Choice (VPSC) Program is to assist states and local school districts in the development of innovative strategies to expand options for students, and to encourage transfers of students from low-performing to higher-performing schools. This report presents interim findings from the National Evaluation of…

  8. Comprehensive Illinois Occupational Education Demonstration Center. Second Interim Report.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    The second interim report covers the time period from July 1, 1974 to June 30, 1975, phase two of the project. The document consists of four separate reports: a report summary, reports of the two demonstration centers, and a third party evaluation by Educational Management Services, Inc. The 13-page summary describes the overall project. A 39-page…

  9. Common Spacecraft Bus for Earth Science Decadal Survey Missions

    NASA Astrophysics Data System (ADS)

    Cook, T.; Klaus, K.; Elsperman, M. S.

    2010-12-01

    Our study assessed the overall technical and programmatic viability of a Common Spacecraft Bus (CSB) approach that could satify the requirements of multiple Earth Science Decadal Mission programs resulting in cost and schedule savings over individual programs. Our approach developed a Common Payload Interface (CPIF) concept based on assessment of TIER I mission requirements to enable flexibility to the payloads while maintaining maximum commonality in the bus design. Satellite missions in Tier 1 of the Decadal Survey are missions with a launch period beginning in 2014. Four missions are planned and will measure climate change by examining solar and earth radiation, soil moisture and freeze/thaw cycles, ice sheet height differences, surface and ice sheet deformation from natural hazards, and vegetation structure (SMAP, ICESat-2, CLARREO, and DESDynI). Our study goals and objectives were: Develop a Common Spacecraft Bus (CSB) that incorporates the defined CPIF that can be configured to meet the individual Tier I mission specific requirements with minimal impacts or changes; Develop a efficient Assembly, Integration and Test (AI&T) flow and program schedule that can accommodate multiple Observatory level spacecraft processing and provide the flexibility to respond to program changes and other schedule perturbations; Develop a ROM cost for the CSB program approach, based on the reference design and schedules; Evaluate the CSB capability to host payloads of opportunity on the Tier I spacecraft; Evaluate the CSB capability to host the Tier II missions and what changes are required from the Tier I CSB We concluded: CSB approach for Tier I missions is feasible with very good synergy; Program Execution and AI&T approaches can be defined to take maximum advantage of CSB program approach and meet required launch readiness dates; ROM cost analysis indicates that a CSB approach is viable and offers substantial savings over separate procurements The Common Spacecraft Bus

  10. Measurement of Parasitic Inductances in the Bus-Bar Assembly of a High Power Voltage Source Converter

    NASA Astrophysics Data System (ADS)

    Datta, Aniket; Narayanan, G.

    2016-05-01

    Insulated gate bipolar transistor (IGBT) based voltage source converters use copper plates with insulating sheets in between them (sandwich bus-bar arrangement) for connecting the different device terminals in the power circuit. In such converters, the parasitic inductances in the power circuit are crucial as they cause overvoltage spikes across the device. Also, the parasitics affect the current sharing between IGBTs when they are connected in parallel in high power converters. The conduction path through plates and fasteners in the bus-bar assembly is three-dimensional and quite complex, making analytical evaluation of the stray inductance quite challenging. The first objective here is to present a simple experimental setup and experimental procedure, which are convenient for power electronic engineers, to measure the bus-bar inductance. The next objective is to carry out experimental studies on the inductances offered by different components and sub-assemblies in a bus-bar assembly. This includes evaluation of inductances of the different conduction paths in typical bus-bar plates. The third objective is to experimentally evaluate the parasitic inductances in the bus-bar assembly of a commercial 250 kVA high power converter. Each leg of this converter consists of two 300 A/1200 V IGBTs connected in parallel. The effective inductance seen by the individual device modules are determined experimentally.

  11. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites: Final report

    SciTech Connect

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs.

  12. Testing of Environmental Satellite Bus-Instrument Interfaces Using Engineering Models

    NASA Technical Reports Server (NTRS)

    Gagnier, Donald; Hayner, Rick; Nosek, Thomas; Roza, Michael; Hendershot, James E.; Razzaghi, Andrea I.

    2004-01-01

    This paper discusses the formulation and execution of a laboratory test of the electrical interfaces between multiple atmospheric scientific instruments and the spacecraft bus that carries them. The testing, performed in 2002, used engineering models of the instruments and the Aura spacecraft bus electronics. Aura is one of NASA s Earth Observatory System missions. The test was designed to evaluate the complex interfaces in the command and data handling subsystems prior to integration of the complete flight instruments on the spacecraft. A problem discovered during the flight integration phase of the observatory can cause significant cost and schedule impacts. The tests successfully revealed problems and led to their resolution before the full-up integration phase, saving significant cost and schedule. This approach could be beneficial for future environmental satellite programs involving the integration of multiple, complex scientific instruments onto a spacecraft bus.

  13. 58. VIEW OF SIGNAL BUS SECTION NUMBER 2 LOCATED OVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. VIEW OF SIGNAL BUS SECTION NUMBER 2 LOCATED OVER THE CONTROL ROOM MEZZANINE IN THE SIGNAL POWER CONDITIONING ROOM. BUS IS A HEAVY COPPER BAR APPROXIMATELY 1/2" BY 4" WHICH CONDUCTS POWER THROUGHOUT THE POWER PLANT. BUS ARE PROTECTED BY A BRICK AND SOAPSTONE HOUSING. OPENINGS FOR INSPECTION AND ACCESS WOULD NORMALLY BE PROTECTED BY GLASS DOORS. THE BUS WOULD BE SUPPORTED ON INSULATORS WITHIN THE BRICK CHAMBER. BUS WAS REMOVED AND SALVAGED WHEN THE STATION WAS ABANDONED. THE OBJECT IN THE TOP CENTER OF THE PHOTOGRAPH IS A POTENTIAL TRANSFORMER USED TO REDUCE BUS POTENTIAL OF 2200 VOLTS TO LOW VOLTAGES SAFE FOR USE IN CONTROL ROOM CIRCUITRY. POTENTIAL TRANSFORMERS ARE PRECISION DEVICES WHICH PRODUCE AN ACCURATE LOW VOLTAGE ANALOG OF THE HIGH VOLTAGE ON THE BUS. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT

  14. Loss of interim status (LOIS) under RCRA

    SciTech Connect

    Not Available

    1992-09-01

    The Resource Conservation and Recovery Act (RCRA) requires owners and operators of facilities that treat, store, or dispose of hazardous waste (TSDFs) to obtain an operating permit. Recognizing that it would take EPA many years to issue operating permits to all RCRA facilities, Congress created ``interim status`` under Section 3005(e) of the Act. Interim status allows facilities to operating permits to all RCRA facilities to operate under Subtitle C of RCRA until their permits are issued or denied. This information brief defines interim status and describes how failure to meet interim status requirements may lead to loss of interim status (LOIS).

  15. Impact of a pilot Walking School Bus intervention on children's pedestrian safety behaviors [abstract

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Walking School Bus (WSB) programs have increased children's active commuting to school and physical activity; however, the impact on child pedestrian safety behaviors has not been studied. Our study objective was to evaluate the impact of a WSB program on children's pedestrian safety behaviors. We c...

  16. A program downloader and other utility software for the DATAC bus monitor unit

    NASA Technical Reports Server (NTRS)

    Novacki, Stanley M., III

    1987-01-01

    A set or programs designed to facilitate software testing on the DATAC Bus Monitor is described. By providing a means to simplify program loading, firmware generation, and subsequent testing of programs, the overhead involved in software evaluation is reduced and that time is used more productively in performance, analysis and improvement of current software.

  17. Data breaches. Interim final rule.

    PubMed

    2007-06-22

    This document establishes regulations to address data breaches regarding sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). The regulations implement certain provisions of Title IX of the Veterans Benefits, Health Care, and Information Technology Act of 2006, which require promulgation of these regulations as an interim final rule. PMID:17674483

  18. A review of proposed Glen Canyon Dam interim operating criteria

    SciTech Connect

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  19. Dobson, Brewer, ERA-40 and ERA-Interim original and assimilated total ozone data sets - evaluation of differences: a case study, Hradec Králové (Czech), 1961-2010

    NASA Astrophysics Data System (ADS)

    Vaníček, K.; Metelka, L.; Skřivánková, P.; Staněk, M.

    2012-05-01

    Homogenized data series of total ozone measurements taken by the regularly and well calibrated Dobson and Brewer spectrophotometers at Hradec Králové (Czech) and the data from the re-analyses ERA-40 and ERA-Interim were assimilated and combined to investigate differences between the particular data sets over Central Europe, the NH mid-latitudes. The Dobson-to-Brewer transfer function and the algorithm for approximation of the data from the re-analyses were developed, tested and applied for creation of instrumentally consistent and completed total ozone data series of the 50-yr period 1961-2010 of observations. The assimilation has reduced the well-known seasonal differences between Dobson and Brewer data below the 1% calibration limit of the spectrophotometers. Incorporation of the ERA-40 and ERA-Interim total ozone data on days with missing measurements significantly improved completeness and reliability of the data series mainly in the first two decades of the period concerned. Consistent behaviour of the original and assimilated data sets was found in the pre-ozone-hole period (1961-1985). In the post-Pinatubo (1994-2010) era the data series show seasonal differences that can introduce uncertainty in estimation of ozone recovery mainly in the winter-spring season when the effect of the Montreal Protocol and its Amendments is expected. All the data sets confirm substantial depletion of ozone also in the summer months that gives rise to the question about its origin. The assimilated and completed data series of total ozone will be further analyzed to quantify chemical ozone losses and contribution of natural atmospheric processes to the ozone depletion over the region. This case study points out importance of selection and evaluation of the quality and consistency of the input data sets used in estimation of long-term ozone changes including recovery of the ozone layer over the selected areas. Data are available from the PANGAEA database at

  20. Dobson, Brewer, ERA-40 and ERA-Interim original and merged total ozone data sets - evaluation of differences: a case study, Hradec Králové (Czech), 1961-2010

    NASA Astrophysics Data System (ADS)

    Vaníček, K.; Metelka, L.; Skřivánková, P.; Staněk, M.

    2012-09-01

    Homogenized data series of total ozone measurements taken by the regularly and well calibrated Dobson and Brewer spectrophotometers at Hradec Králové (Czech) and the data from the re-analyses ERA-40 and ERA-Interim were merged and compared to investigate differences between the particular data sets originated in Central Europe, the Northern Hemisphere (NH) mid-latitudes. The Dobson-to-Brewer transfer function and the algorithm for approximation of the data from the re-analyses were developed, tested and applied for creation of instrumentally consistent and completed total ozone data series of the 50-yr period 1961-2010 of observations. This correction has reduced the well-known seasonal differences between Dobson and Brewer data below the 1% calibration limit of the spectrophotometers. Incorporation of the ERA-40 and ERA-Interim total ozone data on days with missing measurements significantly improved completeness and reliability of the data series mainly in the first two decades of the period concerned. Consistent behaviour of the original and corrected/merged data sets was found in the pre-ozone-hole period (1961-1985). In the post-Pinatubo (1994-2010) era the data series show seasonal differences that can introduce uncertainty in estimation of ozone recovery mainly in the winter-spring season when the effect of the Montreal Protocol and its Amendments is expected. All the data sets confirm substantial depletion of ozone also in the summer months that gives rise to the question about its origin. The merged and completed data series of total ozone will be further analyzed to quantify chemical ozone losses and contribution of natural atmospheric processes to the ozone depletion over the region. This case study points out the importance of selection and evaluation of the quality and consistency of the input data sets used in estimation of long-term ozone changes including recovery of the ozone layer over the selected areas. Data are available from the PANGAEA

  1. Indoor air quality and occupational exposures at a bus terminal.

    PubMed

    El-Fadel, Mutasem; El-Hougeiri, Nisrine

    2003-07-01

    This article presents an assessment of indoor air quality at a bus terminal. For this purpose, field surveys were conducted, and air samples were collected and analyzed for the presence of selected indoor air quality indicators. Mathematical modeling was performed to simulate bus emission rates, occupational exposure, and ventilation requirements to maintain acceptable indoor air quality. A sensitivity analysis based on literature-derived emission rates estimates was conducted to evaluate the effect of seasonal temperature changes within the terminal. Control measures to improve indoor air quality at the terminal are also outlined. While carbon monoxide concentrations were below the corresponding American Conference of Governmental Industrial Hygienists' (ACGIH) standards under normal operating conditions, they exceeded the 8-hr recommended average standard at peak hours and the World Health Organization (WHO) standard at all times. Total suspended particulates levels, on the other hand, were above the 24-hr American Society of Heating, Refrigerating and Air Conditioning Engineers' (ASHRAE) standard. Carbon monoxide emission rates that were estimated using the transient mass balance model correlated relatively well with those reported in the literature. Modeling results showed that the natural ventilation rate should be at least doubled for acceptable indoor air quality. While pollutant exposure levels depended on the individual activity patterns and the pollutant concentration, pollutant emissions rates within the terminal were affected mostly by the temperature with a 20-25 percent variation in carbon monoxide levels due to changes in seasonal temperatures. PMID:12791548

  2. Exposure assessment of diesel bus emissions.

    PubMed

    Yip, Maricela; Madl, Pierre; Wiegand, Aaron; Hofmann, Werner

    2006-12-01

    The goal of this study was to measure ultrafine particle concentrations with diameters less than 1 mum emitted by diesel buses and to assess resulting human exposure levels. The study was conducted at the Woolloongabba Busway station in Brisbane, Australia in the winter months of 2002 during which temperature inversions frequently occurred. Most buses that utilize the station are fuelled by diesel, the exhaust of which contains a significant quantity of particle matter. Passengers waiting at the station are exposed to these particles emitted from the buses. During the course of this study, passenger census was conducted, based on video surveillance, yielding person-by-person waiting time data. Furthermore, a bus census revealed accurate information about the total number of diesel versus Compressed Natural Gas (CNG) powered buses. Background (outside of the bus station) and platform measurements of ultrafine particulate number size distributions were made to determine ambient aerosol concentrations. Particle number exposure concentration ranges from 10 and 40 to 60% of bus related exhaust fumes. This changes dramatically when considering the particle mass exposure concentration, where most passengers are exposed to about 50 to 80% of exhaust fumes. The obtained data can be very significant for comparison with similar work of this type because it is shown in previous studies that exhaust emissions causes cancer in laboratory animals. It was assumed that significant differences between platform and background distributions were due to bus emissions which, combined with passenger waiting times, yielded an estimate of passenger exposure to ultrafine particles from diesel buses. From an exposure point of view, the Busway station analyzed resembles a street canyon. Although the detected exhaust particle concentration at the outbound platform is found to be in the picogram range, exposure increases with the time passengers spend on the platform along with their breathing

  3. Folded fibre bus interconnects with distributed amplification

    NASA Astrophysics Data System (ADS)

    Lorenzo, Raul Hernandez; Urquhart, Paul; Lopez-Amo, Manuel

    1998-06-01

    An optical fibre network for application as an interconnect within major nodes is investigated theoretically. The network is configured as a folded bus in which the spine consists of erbium doped fibre to overcome the power division at the couplers. It is argued that high received powers with a narrow dynamic range can be obtained simultaneously with bit rates in the order of 10 Gbit/s and bit error rates of 10 -12 or less.

  4. High-Resolution Dynamical Downscaling of ERA-Interim Using the WRF Regional Climate Model for the Area of Poland. Part 1: Model Configuration and Statistical Evaluation for the 1981-2010 Period

    NASA Astrophysics Data System (ADS)

    Kryza, Maciej; Wałaszek, Kinga; Ojrzyńska, Hanna; Szymanowski, Mariusz; Werner, Małgorzata; Dore, Anthony J.

    2016-03-01

    In this work, we present the results of high-resolution dynamical downscaling of air temperature, relative humidity, wind speed and direction, for the area of Poland, with the Weather Research and Forecasting (WRF) model. The model is configured using three nested domains, with spatial resolution of 45 km × 45 km, 15 km × 15 km and 5 km × 5 km. The ERA-Interim database is used for boundary conditions. The results are evaluated by comparison with station measurements for the period 1981-2010. The model is capable of reproducing the main climatological features of the study area. The results are in very close agreement with the measurements, especially for the air temperature. For all four meteorological variables, the model performance captures seasonal and daily cycles. For the air temperature and winter season, the model underestimates the measurements. For summer, the model shows higher values, compared with the measurements. The opposite is the case for relative humidity. There is a strong diurnal pattern in mean error, which changes seasonally. The agreement with the measurements is worse for the seashore and mountain areas, which suggests that the 5 km × 5 km grid might still have an insufficient spatial resolution. There is no statistically significant temporal trend in the model performance. The larger year-to-year changes in the model performance, e.g. for the years 1982 and 2010 for the air temperature should therefore be linked with the natural variability of meteorological conditions.

  5. Spacecraft design project multipurpose satellite bus MPS

    NASA Technical Reports Server (NTRS)

    Kellman, Lyle; Riley, John; Szostak, Michael; Watkins, Joseph; Willhelm, Joseph; Yale, Gary

    1990-01-01

    The thrust of this project was to design not a single spacecraft, but to design a multimission bus capable of supporting several current payloads and unnamed, unspecified future payloads. Spiraling costs of spacecraft and shrinking defense budgets necessitated a fresh look at the feasibility of a multimission spacecraft bus. The design team chose two very diverse and different payloads, and along with them two vastly different orbits, to show that multimission spacecraft buses are an area where indeed more research and effort needs to be made. Tradeoffs, of course, were made throughout the design, but optimization of subsystem components limited weight and volume penalties, performance degradation, and reliability concerns. Simplicity was chosen over more complex, sophisticated and usually more efficient designs. Cost of individual subsystem components was not a primary concern in the design phase, but every effort was made to chose flight tested and flight proven hardware. Significant cost savings could be realized if a standard spacecraft bus was indeed designed and purchased in finite quantities.

  6. Investigation of the Public Library as a Linking Agent to Major Scientific, Educational, Social, and Environmental Data Bases. Two-Year Interim Report. Annex I: Evaluation Results.

    ERIC Educational Resources Information Center

    Ahlgren, Alice E.

    Four public libraries participated in a two-year investigation of the provision of on line reference services in a public library setting. To evaluate the utility and cost of the service, data were collected about search statistics, usage patterns, costs, and impact on the library. This volume of the report contains the evaluation methodology,…

  7. Accurate transfer of soft tissue morphology with interim prosthesis to definitive cast.

    PubMed

    Noh, Kwantae; Kwon, Kung-Rock; Kim, Hyeong-Seob; Kim, Duck-Su; Pae, Ahran

    2014-02-01

    With conventional fixed dental prostheses, the interim restoration is a valuable diagnostic tool in the evaluation of esthetics and function. To achieve predictable definitive esthetic results, information about the subgingival and the supragingival contour of a properly designed restoration should be communicated to the dental laboratory technician. The technique described enables the accurate transfer of the soft tissue morphology developed with an interim prosthesis to the definitive cast. This modified definitive cast allows the dental laboratory technician to fabricate a restoration with an emergence profile identical to that of the interim prosthesis. PMID:24286639

  8. An Optimal Control Strategy for DC Bus Voltage Regulation in Photovoltaic System with Battery Energy Storage

    PubMed Central

    Daud, Muhamad Zalani; Mohamed, Azah; Hannan, M. A.

    2014-01-01

    This paper presents an evaluation of an optimal DC bus voltage regulation strategy for grid-connected photovoltaic (PV) system with battery energy storage (BES). The BES is connected to the PV system DC bus using a DC/DC buck-boost converter. The converter facilitates the BES power charge/discharge to compensate for the DC bus voltage deviation during severe disturbance conditions. In this way, the regulation of DC bus voltage of the PV/BES system can be enhanced as compared to the conventional regulation that is solely based on the voltage-sourced converter (VSC). For the grid side VSC (G-VSC), two control methods, namely, the voltage-mode and current-mode controls, are applied. For control parameter optimization, the simplex optimization technique is applied for the G-VSC voltage- and current-mode controls, including the BES DC/DC buck-boost converter controllers. A new set of optimized parameters are obtained for each of the power converters for comparison purposes. The PSCAD/EMTDC-based simulation case studies are presented to evaluate the performance of the proposed optimized control scheme in comparison to the conventional methods. PMID:24883374

  9. An optimal control strategy for DC bus voltage regulation in photovoltaic system with battery energy storage.

    PubMed

    Daud, Muhamad Zalani; Mohamed, Azah; Hannan, M A

    2014-01-01

    This paper presents an evaluation of an optimal DC bus voltage regulation strategy for grid-connected photovoltaic (PV) system with battery energy storage (BES). The BES is connected to the PV system DC bus using a DC/DC buck-boost converter. The converter facilitates the BES power charge/discharge to compensate for the DC bus voltage deviation during severe disturbance conditions. In this way, the regulation of DC bus voltage of the PV/BES system can be enhanced as compared to the conventional regulation that is solely based on the voltage-sourced converter (VSC). For the grid side VSC (G-VSC), two control methods, namely, the voltage-mode and current-mode controls, are applied. For control parameter optimization, the simplex optimization technique is applied for the G-VSC voltage- and current-mode controls, including the BES DC/DC buck-boost converter controllers. A new set of optimized parameters are obtained for each of the power converters for comparison purposes. The PSCAD/EMTDC-based simulation case studies are presented to evaluate the performance of the proposed optimized control scheme in comparison to the conventional methods. PMID:24883374

  10. Immobilized High Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report 2nd Generation Implementing Architecture

    SciTech Connect

    CALMUS, R.B.

    2000-09-14

    Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document.

  11. Communication design for multi-boards based on VME bus

    NASA Astrophysics Data System (ADS)

    Liu, Yang; Song, Fazhi; Wei, Kai; Fu, Zhenxian

    2015-02-01

    As a widely used open-architecture computer bus ,VME bus is increasingly applied in military, aerospace, transportation and other large-scale control systems. Lithography, a very delicate and complicated integrated circuit manufacturing equipment, uses many circuit boards with VME interface in its control system, including one single-board computer, many movement control boards and one data acquisition board. This paper designs communication modules which include VME bus module and VME user-defined bus module for multi-boards in Lithography control system. VME bus module is designed for the communication between the single-board computer and movement control boards and VME user-defined bus is designed for the communication between movement control boards and data acquisition board. The experimental results demonstrate its effectiveness.

  12. 49 CFR 605.18 - Comments by private school bus operators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Comments by private school bus operators. 605.18... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.18 Comments by private school bus operators. Private school bus operators may file written comments on an...

  13. TMS communications hardware. Volume 2: Bus interface unit

    NASA Technical Reports Server (NTRS)

    Brown, J. S.; Hopkins, G. T.

    1979-01-01

    A prototype coaxial cable bus communication system used in the Trend Monitoring System to interconnect intelligent graphics terminals to a host minicomputer is described. The terminals and host are connected to the bus through a microprocessor-based RF modem termed a Bus Interface Unit (BIU). The BIU hardware and the Carrier Sense Multiple Access Listen-While-Talk protocol used on the network are described.

  14. Toward a risk assessment of the spent fuel and high-level nuclear waste disposal system. Risk assessment requirements, literature review, methods evaluation: an interim report

    SciTech Connect

    Hamilton, L.D.; Hill, D.; Rowe, M.D.; Stern, E.

    1986-04-01

    This report provides background information for a risk assessment of the disposal system for spent nuclear fuel and high-level radioactive waste (HLW). It contains a literature review, a survey of the statutory requirements for risk assessment, and a preliminary evaluation of methods. The literature review outlines the state of knowledge of risk assessment and accident consequence analysis in the nuclear fuel cycle and its applicability to spent fuel and HLW disposal. The survey of statutory requirements determines the extent to which risk assessment may be needed in development of the waste-disposal system. The evaluation of methods reviews and evaluates merits and applicabilities of alternative methods for assessing risks and relates them to the problems of spent fuel and HLW disposal. 99 refs.

  15. The SMART MIL-STD-1553 bus adapter hardware manual

    NASA Technical Reports Server (NTRS)

    Ton, T. T.

    1981-01-01

    The SMART Multiplexer Interface Adapter, (SMIA) a complete system interface for message structure of the MIL-STD-1553, is described. It provides buffering and storage for transmitted and received data and handles all the necessary handshaking to interface between parallel 8-bit data bus and a MIL-STD serial bit stream. The bus adapter is configured as either a bus controller of a remote terminal interface. It is coupled directly to the multiplex bus, or stub coupled through an additional isolation transformer located at the connection point. Fault isolation resistors provide short circuit protection.

  16. The missile GINA bus - Remote measurement and restoration

    NASA Astrophysics Data System (ADS)

    Boulanger, G.; Lefeuvre, C.

    The transmission to ground of the data of the missile GINA bus permits very useful exploitation of informations. Due to the diversity of data, the bus interface unit works in two ways: 'addressed' mode and 'spy' mode, which are used in the various on-board units. In practice the use of standard IRIG for telemetry, whose rate is independent of the functional chain under control, requires a temporary memory, dating of bus transfers, and a higher average rate of PCM delivered data than the rate of bus transfers.

  17. Reliable Fiber Sensor System with Star-Ring-Bus Architecture

    PubMed Central

    Peng, Peng-Chun; Wang, Jun-Bo; Huang, Kuan-Yan

    2010-01-01

    This work presents a novel star-ring-bus sensor system and demonstrates its effectiveness. The main trunk of the proposed sensor system is a star topology and the sensing branches comprise a series of bus subnets. Any weakness in the reliability of the sensor system is overcome by adding remote nodes and switches to the ring and bus subnets. To construct the proposed star-ring-bus sensor system, a fiber ring laser scheme is used to improve the signal-to-noise ratio of the sensor system. The proposed system increases the reliability and capacity of fiber sensor systems. PMID:22399876

  18. Burn site groundwater interim measures work plan.

    SciTech Connect

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  19. Making the Most of Out-of-School Time. Executive Summary: Interim Findings from an Evaluation Conducted by Chapin Hall Center for Children at the University of Chicago.

    ERIC Educational Resources Information Center

    Halpern, Robert; Spielberger, Julie; Robb, Sylvan; Stevens, Rachel

    The University of Chicago's Chapin Hall Center for Children evaluated the progress of the Making the Most of Out-of-School Time (MOST) Initiative in Boston, Chicago, and Seattle. MOST's goals are to improve the supply, accessibility, affordability and quality of school-age care, especially for low-income children; and to strengthen the overall…

  20. Evaluation of preservative engine oil containing vapor-phase corrosion inhibitor and a simplified engine-preservation technique. Interim report, Jul 85-Sep 90

    SciTech Connect

    Frame, E.A.

    1990-12-01

    The objectives of this project were: (1) to determine the feasibility of adding a vapor-phase corrosion inhibitor (VCI) component to improve the preservation performance of MIL-L-21260 and (2) to evaluate a less complicated engine preservation procedure. A simultaneous two-phase approach was conducted. Phase 1 involved the formulation and evaluation of experimental VCI oils, while Phase 2 was the evaluation of a simplified engine preservation procedure. VCI oil formulation was conducted by Ronco Laboratory under subcontract. Compatibility of the experimental VCI oils with metal coupons, elastomers, and fuel filters was determined. Effectiveness of the experimental VCI oil was evaluated in a 3-year outdoor engine storage test. The engines were preserved using an experimental, simplified preservation procedure. The simplified engine preservation procedure proved to be acceptable as engines stored for 3 years in a very severe environment were judged to have been adequately preserved. Engine oil meeting specification MIL-L-21260 provided satisfactory protection during the 3-year storage test. The experimental VCI oil also provided satisfactory storage protection during this test; however, there was no observable advantage for the VCI oil. The VCI oil had acceptable compatibility with an elastomeric flex ring, metal coupons (except lead), and fuel filters.

  1. Installation and evaluation of a nuclear power plant operator advisor based on artificial intelligence technology. Interim progress report and second year development plan

    SciTech Connect

    Hajek, B.K.; Miller, D.W.

    1989-06-20

    This report discusses the following topics on a Nuclear Power Plant operator advisor based on artificial Intelligence Technology; Workstation conversion; Software Conversion; V&V Program Development Development; Simulator Interface Development; Knowledge Base Expansion; Dynamic Testing; Database Conversion; Installation at the Perry Simulator; Evaluation of Operator Interaction; Design of Man-Machine Interface; and Design of Maintenance Facility.

  2. 76 FR 68819 - State of Good Repair Bus and Bus Facilities Discretionary Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... companies engaged in public transportation, or private non-profit organizations. Additionally, the SGR... the nation's public transportation bus fleet, infrastructure, and equipment in a state of good repair... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF...

  3. 75 FR 74134 - State of Good Repair Bus and Bus Facilities Discretionary Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... engaged in public transportation, or private non-profit organizations. Additionally, the SGR Initiative... shown in Table 1 will provide funds to help maintain the nation's public transportation bus fleet... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF...

  4. Managing Student Behavior on the School Bus: A Key to Bus Safety

    ERIC Educational Resources Information Center

    American Federation of Teachers (NJ), 2007

    2007-01-01

    School buses are the safest form of mass transit in America. Every day, school buses travel through congested city traffic and on isolated country roads in all types of weather, safely transporting millions of children to and from school and school-related activities. Federal and state standards for school bus construction and maintenance and…

  5. Spaceborne Fiber Optic Data Bus (SFODB)

    NASA Technical Reports Server (NTRS)

    Bretthauer, Joy W.; Chalfant, Chuck H.; Orlando, Fred J.; Parkerson, P.; Rezek, Ed; Sawyer, Marc

    1999-01-01

    Spaceborne Fiber Optic Data Bus (SFODB) is an IEEE 1393 compliant, gigabit per second, fiber optic network specifically designed to support the real-time, on-board data handling requirements of remote sensing spacecraft. The network is fault tolerant highly reliable, and capable of withstanding the rigors of launch and the harsh space environment. SFODB achieves this operational and environmental performance while maintaining the small size, light weight, and low power necessary for spaceborne applications. On December 9, 1998, SFODB was successfully demonstrated at NASA's Goddard Space Flight Center (GSFC).

  6. Redesign of Transjakarta Bus Driver's Cabin

    NASA Astrophysics Data System (ADS)

    Mardi Safitri, Dian; Azmi, Nora; Singh, Gurbinder; Astuti, Pudji

    2016-02-01

    Ergonomic risk at work stations with type Seated Work Control was one of the problems faced by Transjakarta bus driver. Currently “Trisakti” type bus, one type of bus that is used by Transjakarta in corridor 9, serving route Pinang Ranti - Pluit, gained many complaints from drivers. From the results of Nordic Body Map questionnaires given to 30 drivers, it was known that drivers feel pain in the neck, arms, hips, and buttocks. Allegedly this was due to the seat position and the button/panel bus has a considerable distance range (1 meter) to be achieved by drivers. In addition, preliminary results of the questionnaire using Workstation Checklist identified their complaints about uncomfortable cushion, driver's seat backrest, and the exact position of the AC is above the driver head. To reduce the risk level of ergonomics, then did research to design the cabin by using a generic approach to designing products. The risk analysis driver posture before the design was done by using Rapid Upper Limb Assessment (RULA), Rapid Entire Body Assessment (REBA), and Quick Exposure Checklist (QEC), while the calculation of the moment the body is done by using software Mannequin Pro V10.2. Furthermore, the design of generic products was done through the stages: need metric-matrix, house of quality, anthropometric data collection, classification tree concept, concept screening, scoring concept, design and manufacture of products in the form of two-dimensional. While the design after design risk analysis driver posture was done by using RULA, REBA, and calculation of moments body as well as the design visualized using software 3DMax. From the results of analysis before the draft design improvements cabin RULA obtained scores of 6, REBA 9, and the result amounted to 57.38% QEC and moment forces on the back is 247.3 LbF.inch and on the right hip is 72.9 LbF.in. While the results of the proposed improvements cabin design RULA obtained scores of 3, REBA 4, and the moment of force on

  7. Bus application of oxygen-enrichment technology and diesel-electric hybrid systems

    SciTech Connect

    Sekar, R.R.; Marr, W.W.

    1993-10-01

    The amendments to the Clean Air Act (CAA) mandate very strict limits on particulate, smoke, and other emissions from city buses. The use of alternative fuels, such as compressed natural gas (CNG) or methanol, can help transit operators, such as the Chicago Transit Authority (CTA), meet the mandated limits. However, the capital investment needed to convert the fueling infrastructure and buses is large, as is the expense of training personnel. If a {open_quotes}clean diesel{close_quotes} bus can be implemented with the help of oxygen-enrichment technology or a diesel-electric hybrid system, this large investment could be postponed for many years. The Regional Transportation Authority (RTA) initiated this project to evaluate the possibility of applying these technologies to CTA buses. Argonne National Laboratory (ANL) conducted a limited number of engine tests and computer analyses and concluded that both concepts are practical and will help in a {open_quotes}clean diesel{close_quotes} bus that can meet the mandated limits of the CAA amendments. The oxygen enrichment of combustion air depends on the availability of a compact and economical membrane separator. Because the technology for this critical component is still under development, it is recommended that an actual bus demonstration be delayed until prototype membranes are available. The hybrid propulsion system is ready for the demonstration phase, and it is recommended that the CTA and RTA commence planning for a bus demonstration.

  8. Traffic signal design and simulation for vulnerable road users safety and bus preemption

    NASA Astrophysics Data System (ADS)

    Lo, Shih-Ching; Huang, Hsieh-Chu

    2015-01-01

    Mostly, pedestrian car accidents occurred at a signalized interaction is because pedestrians cannot across the intersection safely within the green light. From the viewpoint of pedestrian, there might have two reasons. The first one is pedestrians cannot speed up to across the intersection, such as the elders. The other reason is pedestrians do not sense that the signal phase is going to change and their right-of-way is going to be lost. Developing signal logic to protect pedestrian, who is crossing an intersection is the first purpose of this study. In addition, to improve the reliability and reduce delay of public transportation service is the second purpose. Therefore, bus preemption is also considered in the designed signal logic. In this study, the traffic data of the intersection of Chong-Qing North Road and Min-Zu West Road, Taipei, Taiwan, is employed to calibrate and validate the signal logic by simulation. VISSIM 5.20, which is a microscopic traffic simulation software, is employed to simulate the signal logic. From the simulated results, the signal logic presented in this study can protect pedestrians crossing the intersection successfully. The design of bus preemption can reduce the average delay. However, the pedestrian safety and bus preemption signal will influence the average delay of cars largely. Thus, whether applying the pedestrian safety and bus preemption signal logic to an intersection or not should be evaluated carefully.

  9. Study on the calculation models of bus delay at bays using queueing theory and Markov chain.

    PubMed

    Sun, Feng; Sun, Li; Sun, Shao-Wei; Wang, Dian-Hai

    2015-01-01

    Traffic congestion at bus bays has decreased the service efficiency of public transit seriously in China, so it is crucial to systematically study its theory and methods. However, the existing studies lack theoretical model on computing efficiency. Therefore, the calculation models of bus delay at bays are studied. Firstly, the process that buses are delayed at bays is analyzed, and it was found that the delay can be divided into entering delay and exiting delay. Secondly, the queueing models of bus bays are formed, and the equilibrium distribution functions are proposed by applying the embedded Markov chain to the traditional model of queuing theory in the steady state; then the calculation models of entering delay are derived at bays. Thirdly, the exiting delay is studied by using the queueing theory and the gap acceptance theory. Finally, the proposed models are validated using field-measured data, and then the influencing factors are discussed. With these models the delay is easily assessed knowing the characteristics of the dwell time distribution and traffic volume at the curb lane in different locations and different periods. It can provide basis for the efficiency evaluation of bus bays. PMID:25759720

  10. Traffic signal design and simulation for vulnerable road users safety and bus preemption

    SciTech Connect

    Lo, Shih-Ching; Huang, Hsieh-Chu

    2015-01-22

    Mostly, pedestrian car accidents occurred at a signalized interaction is because pedestrians cannot across the intersection safely within the green light. From the viewpoint of pedestrian, there might have two reasons. The first one is pedestrians cannot speed up to across the intersection, such as the elders. The other reason is pedestrians do not sense that the signal phase is going to change and their right-of-way is going to be lost. Developing signal logic to protect pedestrian, who is crossing an intersection is the first purpose of this study. In addition, to improve the reliability and reduce delay of public transportation service is the second purpose. Therefore, bus preemption is also considered in the designed signal logic. In this study, the traffic data of the intersection of Chong-Qing North Road and Min-Zu West Road, Taipei, Taiwan, is employed to calibrate and validate the signal logic by simulation. VISSIM 5.20, which is a microscopic traffic simulation software, is employed to simulate the signal logic. From the simulated results, the signal logic presented in this study can protect pedestrians crossing the intersection successfully. The design of bus preemption can reduce the average delay. However, the pedestrian safety and bus preemption signal will influence the average delay of cars largely. Thus, whether applying the pedestrian safety and bus preemption signal logic to an intersection or not should be evaluated carefully.

  11. Study on the Calculation Models of Bus Delay at Bays Using Queueing Theory and Markov Chain

    PubMed Central

    Sun, Li; Sun, Shao-wei; Wang, Dian-hai

    2015-01-01

    Traffic congestion at bus bays has decreased the service efficiency of public transit seriously in China, so it is crucial to systematically study its theory and methods. However, the existing studies lack theoretical model on computing efficiency. Therefore, the calculation models of bus delay at bays are studied. Firstly, the process that buses are delayed at bays is analyzed, and it was found that the delay can be divided into entering delay and exiting delay. Secondly, the queueing models of bus bays are formed, and the equilibrium distribution functions are proposed by applying the embedded Markov chain to the traditional model of queuing theory in the steady state; then the calculation models of entering delay are derived at bays. Thirdly, the exiting delay is studied by using the queueing theory and the gap acceptance theory. Finally, the proposed models are validated using field-measured data, and then the influencing factors are discussed. With these models the delay is easily assessed knowing the characteristics of the dwell time distribution and traffic volume at the curb lane in different locations and different periods. It can provide basis for the efficiency evaluation of bus bays. PMID:25759720

  12. Correlation between Driver Subjective Fatigue and Bus Lateral Position in a Driving Simulator

    PubMed Central

    Gharagozlou, Faramarz; Mazloumi, Adel; Saraji, Gebraeil Nasl; Nahvi, Ali; Ashouri, Mohammadreza; Mozaffari, Hamed

    2015-01-01

    Background: Driver fatigue as a leading cause of death in the transportation industry can impair the driving performance in long-distance driving task. Studies on the links of driver subjective fatigue and the bus lateral position are still an exploratory issue that requires further investigation. This study aimed to determine the correlation between the driver subjective fatigue and the bus lateral position in a driving simulator. Methods: This descriptive-analytical research was conducted on 30 professional male bus drivers participated in a two-hour driving session. The driver subjective fatigue was assessed by the Fatigue Visual Analogue Scale (F-VAS) at 10-min intervals. Simultaneously, the performance measures of lane drifting as the mean and standard deviation of the bus lateral position (SDLP) were calculated during the simulated driving task. Descriptive statistics and the Spearman correlation coefficient were used to describe and analyze the data. Results: Fatigue levels had an increasing trend as the time-on-task of driving increased. Time-on-task of driving had the greatest effect on the fatigue self-evaluation (r = 0.605, p < 0.0001). The results showed a significant correlation between fatigue self-evaluation and bus lateral position (r = 0.567, p < 0.0001). Conclusion: As the time of driving increased, driving performance was affected adversely, as shown by the increase in the SDLP. Even so, the effect of individual differences on driving performance should not be overlooked. This work concludes that predicting the state of a driver fatigue based on the group mean data has some complications for any application. PMID:26396734

  13. Development of analytical tools for evaluating operations of light rail at grade within an urban signal system. Interim report 3. Research report, September 1991-August 1994

    SciTech Connect

    Berry, R.A.; Walters, C.H.

    1994-11-01

    This report identifies and recommends measures of impact that are applicable to the operation of at-grade light rail crossings within traffic signal systems. The key point in identifying measures of impact is to maintain consistency with traffic signal measures of impacts. The recommended measures of impact include average delay and queue length. The report illustrates how the analyst can apply both manual calculation methods and computer models to estimate these measures of impact. Included in the discussion is a screening procedure that is desinged to minimize total work effort by identifying impacts and mitigating them with the least intensive analysis method. However, if the analysis results are marginal, then full simulation of the traffic signal system including the light rail line is warranted. The recommended programs for such evaluation are TRANSYT-7F for simpler problems and Traf-NETSIM for complex problems and analysis of system variances.

  14. Development of the improved corrosion rate meter and evaluation of commercially developed high-temperature pH electrodes. Interim report for period ending September 1981

    SciTech Connect

    Danielson, M.J.

    1982-01-01

    The continued development of the improved corrosion rate meter (ICR) and the initial laboratory evaluation of commercially developed pH electrodes are discussed. The objective of this work is to develop a more flexible instrument that would respond with correct corrosion rates under a wider range of conditions. The ICR was successfully tested in the field and in the laboratory. Although commercial corrosion rate meters (CCRs) are adequate for many situations, the ICR is the most versatile instrument and gives more accurate corrosion rate measurements. Glass and ceramic pH electrodes were tested at 85/sup 0/C and 200/sup 0/. None of the electrodes performed well at 95/sup 0/C, and the glass pH electrodes either failed or had no pH response at 200/sup 0/C. The ceramic electrode performed well at 200/sup 0/C and is worthy of further development.

  15. Performance and evaluation of gas engine driven rooftop air conditioning equipment at the Willow Grove (PA) Naval Air Station. Interim report, 1992 cooling season

    SciTech Connect

    Armstrong, P.R.; Conover, D.R.

    1993-05-01

    In a field evaluation conducted for the US Department of Energy (DOE) Office of Federal Energy Management Program (FEMP), the Pacific Northwest Laboratory (PNL) examined the performance of a new US energy-related technology under the FEMP Test Bed Demonstration Program. The technology was a 15-ton natural gas engine driven roof top air conditioning unit. Two such units were installed on a naval retail building to provide space conditioning to the building. Under the Test Bed Demonstration Program, private and public sector interests are focused to support the installation and evaluation of new US technologies in the federal sector. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) with DOE were the American Gas Cooling Center, Philadelphia Electric Company, Thermo King Corporation, and the US Naval Air Station at Willow Grove, Pennsylvania. Equipment operating and service data as well as building interior and exterior conditions were secured for the 1992 cooling season. Based on a computer assessment of the building using standard weather data, a comparison was made with the energy and operating costs associated with the previous space conditioning system. Based on performance during the 1992 cooling season and adjusted to a normal weather year, the technology will save the site $6,000/yr in purchased energy costs. An additional $9,000 in savings due to electricity demand ratchet charge reductions will also be realized. Detailed information on the technology, the installation, and the results of the technology test are provided to illustrate the advantages to the federal sector of using this technology. A history of the CRADA development process is also reported.

  16. Evaluation of the deposition, translocation and pathological response of brake dust with and without added chrysotile in comparison to crocidolite asbestos following short-term inhalation: Interim results

    SciTech Connect

    Bernstein, David M.; Rogers, Rick; Sepulveda, Rosalina; Kunzendorf, Peter; Bellmann, Bernd; Ernst, Heinrich; Phillips, James I.

    2014-04-01

    Chrysotile has been frequently used in the past in manufacturing brakes and continues to be used in brakes in many countries. This study was designed to provide an understanding of the biokinetics and potential toxicology following inhalation of brake dust following short term exposure in rats. The deposition, translocation and pathological response of brake dust derived from brake pads manufactured with chrysotile were evaluated in comparison to the amphibole, crocidolite asbestos. Rats were exposed by inhalation 6 h/day for 5 days to either brake dust obtained by sanding of brake-drums manufactured with chrysotile, a mixture of chrysotile and the brake dust or crocidolite asbestos. No significant pathological response was observed at any time point in either the brake dust or chrysotile/brake dust exposure groups. The long chrysotile fibers (> 20 μm) cleared quickly with T{sub 1/2} estimated as 30 and 33 days, respectively in the brake dust and the chrysotile/brake dust exposure groups. In contrast, the long crocidolite fibers had a T{sub 1/2} > 1000 days and initiated a rapid inflammatory response in the lung following exposure resulting in a 5-fold increase in fibrotic response within 91 days. These results provide support that brake dust derived from chrysotile containing brake drums would not initiate a pathological response in the lung following short term inhalation. - Highlights: • We evaluated brake dust w/wo added chrysotile in comparison to crocidolite asbestos. • Persistence, translocation, pathological response in the lung and pleural cavity. • Chrysotile cleared rapidly from the lung while the crocidolite asbestos persisted. • No significant pathology observed at any time point in the brake-dust groups. • Crocidolite produced pathological response - Wagner 4 interstitial fibrosis by 32d.

  17. Waste Encapsulation and Storage Facility interim operational safety requirements

    SciTech Connect

    COVEY, L.I.

    2000-11-28

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  18. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Motor bus operation. 935.138 Section 935.138 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE TERRITORIAL AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a...

  19. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Motor bus operation. 935.138 Section 935.138 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE TERRITORIAL AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a...

  20. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Motor bus operation. 935.138 Section 935.138 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE TERRITORIAL AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a...

  1. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Motor bus operation. 935.138 Section 935.138 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE TERRITORIAL AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a...

  2. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Motor bus operation. 935.138 Section 935.138 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE TERRITORIAL AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a...

  3. A decentralized software bus based on IP multicas ting

    NASA Technical Reports Server (NTRS)

    Callahan, John R.; Montgomery, Todd

    1995-01-01

    We describe decentralized reconfigurable implementation of a conference management system based on the low-level Internet Protocol (IP) multicasting protocol. IP multicasting allows low-cost, world-wide, two-way transmission of data between large numbers of conferencing participants through the Multicasting Backbone (MBone). Each conference is structured as a software bus -- a messaging system that provides a run-time interconnection model that acts as a separate agent (i.e., the bus) for routing, queuing, and delivering messages between distributed programs. Unlike the client-server interconnection model, the software bus model provides a level of indirection that enhances the flexibility and reconfigurability of a distributed system. Current software bus implementations like POLYLITH, however, rely on a centralized bus process and point-to-point protocols (i.e., TCP/IP) to route, queue, and deliver messages. We implement a software bus called the MULTIBUS that relies on a separate process only for routing and uses a reliable IP multicasting protocol for delivery of messages. The use of multicasting means that interconnections are independent of IP machine addresses. This approach allows reconfiguration of bus participants during system execution without notifying other participants of new IP addresses. The use of IP multicasting also permits an economy of scale in the number of participants. We describe the MULITIBUS protocol elements and show how our implementation performs better than centralized bus implementations.

  4. Application of CAN-bus Network in Intelligent parking

    NASA Astrophysics Data System (ADS)

    Jianjun, WU; Juan, Hu

    Convenient life makes intelligent parking every- where. This paper describes how to connect the various separate modern terminal of intelligent parking with CAN-bus network, and the competitive advantage of the system by using the CAN-bus network. From a technical point of view, this paper describes the development trend of intelligent parking in next few years.

  5. Network Extender for MIL-STD-1553 Bus

    NASA Technical Reports Server (NTRS)

    Marcus, Julius; Hanson, T. David

    2003-01-01

    An extender system for MIL-STD-1553 buses transparently couples bus components at multiple developer sites. The bus network extender is a relatively inexpensive system that minimizes the time and cost of integration of avionic systems by providing a convenient mechanism for early testing without the need to transport the usual test equipment and personnel to an integration facility. This bus network extender can thus alleviate overloading of the test facility while enabling the detection of interface problems that can occur during the integration of avionic systems. With this bus extender in place, developers can correct and adjust their own hardware and software before products leave a development site. Currently resident at Johnson Space Center, the bus network extender is used to test the functionality of equipment that, although remotely located, is connected through a MILSTD- 1553 bus. Inasmuch as the standard bus protocol for avionic equipment is that of MIL-STD-1553, companies that supply MIL-STD-1553-compliant equipment to government or industry and that need long-distance communication support might benefit from this network bus extender

  6. Riding the Bus: Symbol and Vehicle for Boundary Spanning

    ERIC Educational Resources Information Center

    Romero, Deborah

    2014-01-01

    In this reflective essay I examine the activity of a bus tour, organized as the result of an ongoing university and city partnership. I illustrate how riding the bus is not only symbolic for positionality in our society, but also how it can be a viable mechanism for initiating boundary spanning and promoting opportunities for place-based learning…

  7. 16. Bus Room (also known as Switch Gear Room), view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Bus Room (also known as Switch Gear Room), view to the southeast. An air circuit breaker compressor (visible in photograph number 2) was once attached to the main bus relay visible in the background of the photograph. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  8. B Plant interim safety basis

    SciTech Connect

    Chalk, S.E.

    1996-09-01

    This interim safety basis (ISB-008) replaces the B Plant Safety Analysis Report, WHC-SD-WM-SAR-013, Rev. 2 (WHC 1993a). ISB-008 uses existing accident analyses, modified existing accident analyses, and new accident analyses to prove that B Plant remains within the safety envelope for transition, deactivation, standby, and shutdown activities. The analyses in ISB-008 are in accordance with the most current requirements for analytical approach, risk determination, and configuration management. This document and supporting accident analyses replace previous design-basis documents.

  9. Fusion Breeder Program interim report

    SciTech Connect

    Moir, R.; Lee, J.D.; Neef, W.

    1982-06-11

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83.

  10. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  11. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  12. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section. (c) Principles for developing interim goals. (1) RECOVER, using best available science and... available science. These goals may be modified, based on best available science and the adaptive assessment...) Improvement in native plant and animal abundance. (3) In developing the interim goals based upon water...

  13. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section. (c) Principles for developing interim goals. (1) RECOVER, using best available science and... available science. These goals may be modified, based on best available science and the adaptive assessment...) Improvement in native plant and animal abundance. (3) In developing the interim goals based upon water...

  14. 20 CFR 801.202 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Interim appointments. 801.202 Section 801.202 Employees' Benefits BENEFITS REVIEW BOARD, DEPARTMENT OF LABOR ESTABLISHMENT AND OPERATION OF THE BOARD Members of the Board § 801.202 Interim appointments. (a) Acting Chairman. In the event that the...

  15. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  16. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  17. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  18. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  19. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  20. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a Disclosure Undertaking § 356.18 Interim sanctions....

  1. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as...

  2. THESAURUS OF ERIC DESCRIPTORS (INTERIM) JANUARY 1967.

    ERIC Educational Resources Information Center

    1967

    THE "THESAURUS OF ERIC DESCRIPTORS (INTERIM)" SUPERSEDES, AND REPRESENTS A REFINEMENT OF, THE "THESAURUS OF ERIC DESCRIPTORS." THE INTERIM ISSUE IS A PRELIMINARY ERIC SYSTEM TOOL AND IS NOT TO BE CONSIDERED A COMPLETE REPRESENTATION OF THE FINAL PRODUCT. THIS REFINEMENT IS THE RESULT OF TWO MAJOR PROJECTS--(1) THE INCORPORATION OF SUGGESTIONS…

  3. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  4. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  5. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  6. Method and systems for a radiation tolerant bus interface circuit

    NASA Technical Reports Server (NTRS)

    Kinstler, Gary A. (Inventor)

    2007-01-01

    A bus management tool that allows communication to be maintained between a group of nodes operatively connected on two busses in the presence of radiation by transmitting periodically a first message from one to another of the nodes on one of the busses, determining whether the first message was received by the other of the nodes on the first bus, and when it is determined that the first message was not received by the other of the nodes, transmitting a recovery command to the other of the nodes on a second of the of busses. Methods, systems, and articles of manufacture consistent with the present invention also provide for a bus recovery tool on the other node that re-initializes a bus interface circuit operatively connecting the other node to the first bus in response to the recovery command.

  7. Genetic algorithm for multiple bus line coordination on urban arterial.

    PubMed

    Yang, Zhen; Wang, Wei; Chen, Shuyan; Ding, Haoyang; Li, Xiaowei

    2015-01-01

    Bus travel time on road section is defined and analyzed with the effect of multiple bus lines. An analytical model is formulated to calculate the total red time a bus encounters when travelling along the arterial. Genetic algorithm is used to optimize the offset scheme of traffic signals to minimize the total red time that all bus lines encounter in two directions of the arterial. The model and algorithm are applied to the major part of Zhongshan North Street in the city of Nanjing. The results show that the methods in this paper can reduce total red time of all the bus lines by 31.9% on the object arterial and thus improve the traffic efficiency of the whole arterial and promote public transport priority. PMID:25663837

  8. U.S. DOE FreedomCAR and Vehicle Technologies Advanced Technology Development Program for Lithium-Ion Batteries: Gen 2 Performance Evaluation Interim Report

    SciTech Connect

    Jon P. Christophersen; Chet Motloch; Ira D. Bloom; Vince Battaglia; Ganesan Nagasubramanian; Tien Q. Duong

    2003-02-01

    The Advanced Technology Development Program is currently evaluating the performance of the second generation of Lithium-ion cells (i.e., Gen 2 cells). The 18650-size Gen 2 cells consist of a baseline chemistry and one variant chemistry. These cells were distributed over a matrix consisting of three states-of-charge (SOC) (60, 80, and 100% SOC), four temperatures (25, 35, 45, and 55°C), and three life tests (calendar-, cycle-, and accelerated-life). The calendar-life cells are clamped at an opencircuit voltage corresponding to 60% SOC and undergo a once-per-day pulse profile. The cycle-life cells are continuously pulsed using a profile that is centered around 60% SOC. The accelerated-life cells are following the calendar-life test procedures, but using the cycle-life pulse profile. Life testing is interrupted every four weeks for reference performance tests (RPTs), which are used to quantify changes in capacity, resistance, and power. The RPTs consist of a C1/1 and C1/25 static capacity tests, a low-current hybrid pulse power characterization test, and electrochemical impedance spectroscopy at 60% SOC. Capacity-, power-, and electrochemical impedance spectroscopy-based performance results are reported.

  9. High level waste interim storge architecture selection - decision report

    SciTech Connect

    Calmus, R.B.

    1996-09-27

    The U.S. Department of Energy (DOE) has embarked upon a course to acquire Hanford Site tank waste treatment and immobilization services using privatized facilities (RL 1996a). This plan contains a two-phased approach. Phase I is a proof-of-principle/connnercial demonstration- scale effort and Phase II is a fiill-scale production effort. In accordance with the planned approach, interim storage and disposal of various products from privatized facilities are to be DOE fumished. The high-level waste (BLW) interim storage options, or alternative architectures, were identified and evaluated to provide the framework from which to select the most viable method of Phase I BLW interim storage (Calmus 1996). This evaluation, hereafter referred to as the Alternative Architecture Evaluation, was performed to established performance and risk criteria (technical merit, cost, schedule, etc.). Based on evaluation results, preliminary architectures and path forward reconunendations were provided for consideration in the architecture decision- maldng process. The decision-making process used for selection of a Phase I solidified BLW interim storage architecture was conducted in accordance with an approved Decision Plan (see the attachment). This decision process was based on TSEP-07,Decision Management Procedure (WHC 1995). The established decision process entailed a Decision Board, consisting of Westinghouse Hanford Company (VY`HC) management staff, and included appointment of a VTHC Decision Maker. The Alternative Architecture Evaluation results and preliminary recommendations were presented to the Decision Board members for their consideration in the decision-making process. The Alternative Architecture Evaluation was prepared and issued before issuance of @C-IP- 123 1, Alternatives Generation and Analysis Procedure (WI-IC 1996a), but was deemed by the Board to fully meet the intent of WHC-IP-1231. The Decision Board members concurred with the bulk of the Alternative Architecture

  10. NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT

    SciTech Connect

    GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

    2010-10-19

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  11. Photo-Bus-Route-Map: An Intervention to Produce Independence in Bus Travel for Mentally Retarded Adults.

    ERIC Educational Resources Information Center

    LaDuke, Robert O.; LaGrow, Steven J.

    1984-01-01

    A photo-bus-route-map resulted in increased independence in bus travel for four trainable mentally retarded adults. The map included names and numbers of buses, photographs of the boarding point and at least 14 possible destinations, and rebus figures. (CL)

  12. The Wheels on the Bus Go “Buy Buy Buy”: School Bus Advertising Laws

    PubMed Central

    2012-01-01

    School buses, a practical necessity for millions of children, are at the center of new efforts to raise revenue. School bus advertising laws bring public health and commercialization concerns to the school setting. In doing so, they potentially expose school districts to First Amendment lawsuits. I examined various school bus advertising bills and laws. I reviewed First Amendment “forum analysis” as applied in the transit and school settings to clarify how this legal test may affect school districts subject to such laws. I have made recommendations for school districts to enact appropriate policies to ensure that such advertising does not undermine public health and to enable the districts to maintain control over their property. PMID:22742065

  13. Bus industry market study. Report -- Task 3.2: Fuel cell/battery powered bus system

    SciTech Connect

    Zalbowitz, M.

    1992-06-02

    In support of the commercialization of fuel cells for transportation, Georgetown University, as a part of the DOE/DOT Fuel Cell Transit Bus Program, conducted a market study to determine the inventory of passenger buses in service as of December, 1991, the number of buses delivered in 1991 and an estimate of the number of buses to be delivered in 1992. Short term and long term market projections of deliveries were also made. Data was collected according to type of bus and the field was divided into the following categories which are defined in the report: transit buses, school buses, commercial non-transit buses, and intercity buses. The findings of this study presented with various tables of data collected from identified sources as well as narrative analysis based upon interviews conducted during the survey.

  14. The wheels on the bus go "buy buy buy": school bus advertising laws.

    PubMed

    Pomeranz, Jennifer L

    2012-09-01

    School buses, a practical necessity for millions of children, are at the center of new efforts to raise revenue. School bus advertising laws bring public health and commercialization concerns to the school setting. In doing so, they potentially expose school districts to First Amendment lawsuits. I examined various school bus advertising bills and laws. I reviewed First Amendment "forum analysis" as applied in the transit and school settings to clarify how this legal test may affect school districts subject to such laws. I have made recommendations for school districts to enact appropriate policies to ensure that such advertising does not undermine public health and to enable the districts to maintain control over their property. PMID:22742065

  15. Bus bar electrical feedthrough for electrorefiner system

    DOEpatents

    Williamson, Mark; Wiedmeyer, Stanley G; Willit, James L; Barnes, Laurel A; Blaskovitz, Robert J

    2013-12-03

    A bus bar electrical feedthrough for an electrorefiner system may include a retaining plate, electrical isolator, and/or contact block. The retaining plate may include a central opening. The electrical isolator may include a top portion, a base portion, and a slot extending through the top and base portions. The top portion of the electrical isolator may be configured to extend through the central opening of the retaining plate. The contact block may include an upper section, a lower section, and a ridge separating the upper and lower sections. The upper section of the contact block may be configured to extend through the slot of the electrical isolator and the central opening of the retaining plate. Accordingly, relatively high electrical currents may be transferred into a glovebox or hot-cell facility at a relatively low cost and higher amperage capacity without sacrificing atmosphere integrity.

  16. High Speed Data Bus Active Coupler

    NASA Astrophysics Data System (ADS)

    Herrmann, James J.

    The author discusses the HSDB (high speed data bus) active coupler which provides a typical 13-dB power margin for HSDB systems installed in military aircraft. This high-power margin ensures reliable HSDB operation through fiber-optic component degradation. The active coupler performs optical amplification and signal reshaping functions such that an incoming signal is modified only in amplitude. Signal distortion and jitter are removed by a retiming ASIC (application-specific integrated circuit). The active coupler is modular in design, and plug-in growth for a 38 x 38 user interface is available. The active coupler achieves better than -27 dBm sensitivity at 5 x 10 exp -11 bit error rate and outputs -8 to -12 dBm optical power. The active coupler unit weighs only 6.25 lbs and has a predicted mean time between failure of over 21,000 h.

  17. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    SciTech Connect

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  18. 40 CFR 270.73 - Termination of interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Termination of interim status. 270.73... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.73 Termination of interim status. Interim status terminates when: (a) Final administrative disposition of...

  19. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source...

  20. Effect of Interim Annealing on Mechanical Strength of TFA-MOD Derived YBCO Coated Conductors

    NASA Astrophysics Data System (ADS)

    Takagi, Y.; Nakaoka, K.; Nakamura, T.; Yoshizumi, M.; Kiss, T.; Izumi, T.; Shiohara, Y.

    TFA-MOD derived YBCO tapes are expected for many applications due to cost-efficiency. In some applications, uniformity and mechanical strength are required for tapes. A 205 m-long YBCO tape was fabricated with high and uniform Ic performance throughout the tape by adopting the interim annealing before the conversion process. The effect of the interim annealing on the crystal growth mechanism of YBCO has been studied focusing on the relationship between the interim annealing conditions and delamination, in this work. Delamination strength was evaluated in the samples prepared with and without interim annealing by the stud pull method. Measurements were carried out on 50 different points for each sample and the results were analyzed statistically. The difference between the two samples was remarkably seen in the delamination strength below 60 MPa. The conventionally annealed sample had more points with low delamination strength below 60 MPa than the interim annealed one. The cross sectional images of both samples observed by SEM showed that there were few pores within the interim annealed superconducting layer, although conventional superconducting layer had many pores. These results suggest that the pores within YBCO layer might be origins to be propagated for delamination at low strength.

  1. Concordance of interim and final estimates of influenza vaccine effectiveness: a systematic review.

    PubMed

    Leung, Vivian K; Cowling, Benjamin J; Feng, Shuo; Sullivan, Sheena G

    2016-04-21

    The World Health Organization's Global Influenza Surveillance and Response System meets twice a year to generate a recommendation for the composition of the seasonal influenza vaccine. Interim vaccine effectiveness (VE) estimates provide a preliminary indication of influenza vaccine performance during the season and may be useful for decision making. We reviewed 17 pairs of studies reporting 33 pairs of interim and final estimates using the test-negative design to evaluate whether interim estimates can reliably predict final estimates. We examined features of the study design that may be correlated with interim estimates being substantially different from their final estimates and identified differences related to change in study period and concomitant changes in sample size, proportion vaccinated and proportion of cases. An absolute difference of no more than 10% between interim and final estimates was found for 18 of 33 reported pairs of estimates, including six of 12 pairs reporting VE against any influenza, six of 10 for influenza A(H1N1)pdm09, four of seven for influenza A(H3N2) and two of four for influenza B. While we identified inconsistencies in the methods, the similarities between interim and final estimates support the utility of generating and disseminating preliminary estimates of VE while virus circulation is ongoing. PMID:27124573

  2. Interim reliability evaluation program, Browns Ferry 1

    SciTech Connect

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.; Trainer, J.E.; Bertucio, R.C.; Leahy, T.J.

    1981-01-01

    Probabilistic risk analysis techniques, i.e., event tree and fault tree analysis, were utilized to provide a risk assessment of the Browns Ferry Nuclear Plant Unit 1. Browns Ferry 1 is a General Electric boiling water reactor of the BWR 4 product line with a Mark 1 (drywell and torus) containment. Within the guidelines of the IREP Procedure and Schedule Guide, dominant accident sequences that contribute to public health and safety risks were identified and grouped according to release categories.

  3. Rethinking passive transport: bus fare exemptions and young people's wellbeing.

    PubMed

    Jones, Alasdair; Steinbach, Rebecca; Roberts, Helen; Goodman, Anna; Green, Judith

    2012-05-01

    Much recent public health research has emphasised the health impacts for young people of 'active travel' modes, typically defined as walking and cycling. Less research has focused on public transport modes. Drawing on qualitative data, we examine the links between bus travel and wellbeing in London, where young people currently have free bus travel. Our findings indicate that bus travel can be both a physically and socially active experience for young people. We suggest a more nuanced understanding of 'active travel' is now needed, alongside greater attention to urban public transport networks as key sites that impact on important determinants of wellbeing such as independent mobility and social inclusion. PMID:22321902

  4. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ...This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and the Interim Model Deputation Agreements that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. Three Interim Model Deputation Agreements will be used: one agreement for tribes in Public Law 83-280 States, one for tribes in Oklahoma, and......

  5. Impact of a walking school bus program on children’s active commuting to school and physical activity

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Walking School Bus (WSB) pilot program was evaluated to determine the impact on student’s Active Commuting to School (ACS) and moderate-to vigorous- physical activity (MVPA). We conducted a randomized controlled trial in 8 low income, elementary schools in Houston, TX, USA. Students (n=149) wer...

  6. A randomized trial of an interim methadone maintenance clinic.

    PubMed Central

    Yancovitz, S R; Des Jarlais, D C; Peyser, N P; Drew, E; Friedmann, P; Trigg, H L; Robinson, J W

    1991-01-01

    BACKGROUND. Interim methadone maintenance has been proposed as a method of providing clinically effective services to heroin addicts waiting for treatment in standard comprehensive methadone maintenance programs. METHODS. A clinic that provided initial medical evaluation, methadone medication, and AIDS education, but did not include formal drug abuse counseling or other social support services was established in New York City. A sample of 301 volunteer subjects recruited from the waiting list for treatment in the Beth Israel methadone program were randomly assigned to immediate entry into the interim clinic or a control group. RESULTS. There were no differences in initial levels of illicit drug use across the experimental and control groups. One-month urinalysis follow-up data showed a significant reduction in heroin use in the experimental group (from 63% positive at intake to 29% positive) with no change in the control group (62% to 60% positive). No significant change was observed in cocaine urinalyses (approximately 70% positive for both groups at intake and follow-up). A higher percentage of the experimental group were in treatment at 16-month follow-up (72% vs 56%). CONCLUSIONS. Limited services interim methadone maintenance can reduce heroin use among persons awaiting entry into comprehensive treatment and increase the percentage entering treatment. PMID:1659236

  7. DOE UST interim subsurface barrier technologies workshop

    SciTech Connect

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation.

  8. Rfid-Based Automatic Bus Ticketing: Features and Trends

    NASA Astrophysics Data System (ADS)

    Oudah, A.

    2016-02-01

    Recent advancements in various technologies have made remarkable developments in various fields for public welfare and public transport is one such area. In the near future public bus transport system with advanced technologies like Radio Frequency Identification Device (RFID), GSM, GPS, ZigBee and RF modules will gain spotlight due to their advantage of higher convenience and greater life standards as compared to the conventional bus systems. In this paper, a comprehensive review of all several proposed bus ticketing and bus information methods has been presented in detail. The study brings out improved solution in terms of cost, convenience, user satisfaction and future implementation. The choice of working modules and their efficient performance has been discussed along with the highlighted importance of the need of technology for welfare of common public and visually impaired.

  9. CFD Investigation on Long-Haul Passenger Bus

    NASA Astrophysics Data System (ADS)

    Tan, C. F.; Tee, B. T.; Law, H. C.; Lim, T. L.

    2015-09-01

    Air flow distribution is one of the important factors that will influence the bus passenger comfort during long haul travel. Poor air flow distribution not only cause discomfort to the bus passenger but also influence their travel mode as well. The main purpose of this study is to investigate the air flow performance of the bus air-conditioning system through CFD simulation approach. A 3D CAD model of air ducts was drawn and hence analysed by using CFD software, namely ANSYS Fluent, to determine the airflow rate for every outlets of the air-conditioning system. The simulated result was then validated with experimental data obtained from prototype model of air duct. Based on the findings, new design concepts is proposed with the aim to meet the industry requirement as well as to improve the bus passenger comfort during long haul travel.

  10. View of the current distribution "bus" atop switching cabinets within ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of the current distribution "bus" atop switching cabinets within the former transformer building. Looking northwest - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  11. Constant of heat conduction and stabilization of bus bar conductor

    NASA Astrophysics Data System (ADS)

    López, G.

    Using the one-dimensional, time-independent conduction state, a constant of heat conduction is given bringing about the known stabilization theorem and a closed expression for the bus bar to be cryogenically stable in superconducting accelerators.

  12. Analysis of Feeder Bus Network Design and Scheduling Problems

    PubMed Central

    Almasi, Mohammad Hadi; Karim, Mohamed Rehan

    2014-01-01

    A growing concern for public transit is its inability to shift passenger's mode from private to public transport. In order to overcome this problem, a more developed feeder bus network and matched schedules will play important roles. The present paper aims to review some of the studies performed on Feeder Bus Network Design and Scheduling Problem (FNDSP) based on three distinctive parts of the FNDSP setup, namely, problem description, problem characteristics, and solution approaches. The problems consist of different subproblems including data preparation, feeder bus network design, route generation, and feeder bus scheduling. Subsequently, descriptive analysis and classification of previous works are presented to highlight the main characteristics and solution methods. Finally, some of the issues and trends for future research are identified. This paper is targeted at dealing with the FNDSP to exhibit strategic and tactical goals and also contributes to the unification of the field which might be a useful complement to the few existing reviews. PMID:24526890

  13. Study on USB Based CAN Bus for Data Measurement System

    NASA Astrophysics Data System (ADS)

    Wu, Weibin; Hong, Tiansheng; Zhu, Yuqing; He, Guangbin; Ye, Cheng; Li, Haobiao; Chen, Chuwen

    Control area network (CAN) is an international protocol of field bus and universal serial bus (USB) is developing more and more widely. On the other hand, the USB technology combined with the CAN application is still in the development stage, so this research has broad prospects. The USB-based CAN bus system hardware consists of a CAN module, a USB communication module and a micro controller. It has been designed for real-time display and can save the CAN bus message. In addition it has been debugged in actual measurement accompanied by the Kvaser USB CAN II. The test results show that the system can correctly receive all messages frame from Kvaser CanKing. Finally the system has been applied to the project of citrus orchard for transmission of data of the citrus and tree parameters.

  14. Spin-bus concept of spin quantum computing

    SciTech Connect

    Mehring, Michael; Mende, Jens

    2006-05-15

    We present a spin-bus concept of quantum computing where an electron spin S=1/2 acts as a bus qubit connected to a finite number N of nuclear spins I=1/2 serving as client qubits. Spin-bus clusters are considered as local processing units and may be interconnected with other spin-bus clusters via electron-electron coupling in a scaled up version. Here we lay the ground for the basic functional unit with long qubit registers, provide the theory and experimental verification of correlated qubit states, and demonstrate the Deutsch algorithm. Experiments were performed on a qubyte plus one nuclear spin in a solid state system.

  15. Final Report for the H2Fuel Bus

    SciTech Connect

    Jacobs, W.D.

    1998-11-25

    The H2Fuel Bus is the world's first hydrogen-fueled electric hybrid transit bus. It was a project developed through a public/private partnership involving several leading technological and industrial organizations, with primary funding by the Department of Energy (DOE). The primary goals of the project are to gain valuable information on the technical readiness and economic viability of hydrogen fueled buses and to enhance the public awareness and acceptance of emerging hydrogen technologies.

  16. Compressed natural gas bus safety: a quantitative risk assessment.

    PubMed

    Chamberlain, Samuel; Modarres, Mohammad

    2005-04-01

    This study assesses the fire safety risks associated with compressed natural gas (CNG) vehicle systems, comprising primarily a typical school bus and supporting fuel infrastructure. The study determines the sensitivity of the results to variations in component failure rates and consequences of fire events. The components and subsystems that contribute most to fire safety risk are determined. Finally, the results are compared to fire risks of the present generation of diesel-fueled school buses. Direct computation of the safety risks associated with diesel-powered vehicles is possible because these are mature technologies for which historical performance data are available. Because of limited experience, fatal accident data for CNG bus fleets are minimal. Therefore, this study uses the probabilistic risk assessment (PRA) approach to model and predict fire safety risk of CNG buses. Generic failure data, engineering judgments, and assumptions are used in this study. This study predicts the mean fire fatality risk for typical CNG buses as approximately 0.23 fatalities per 100-million miles for all people involved, including bus passengers. The study estimates mean values of 0.16 fatalities per 100-million miles for bus passengers only. Based on historical data, diesel school bus mean fire fatality risk is 0.091 and 0.0007 per 100-million miles for all people and bus passengers, respectively. One can therefore conclude that CNG buses are more prone to fire fatality risk by 2.5 times that of diesel buses, with the bus passengers being more at risk by over two orders of magnitude. The study estimates a mean fire risk frequency of 2.2 x 10(-5) fatalities/bus per year. The 5% and 95% uncertainty bounds are 9.1 x 10(-6) and 4.0 x 10(-5), respectively. The risk result was found to be affected most by failure rates of pressure relief valves, CNG cylinders, and fuel piping. PMID:15876211

  17. An Interim Report on Pennsylvania's Framework for Leadership: Frequently Asked Questions

    ERIC Educational Resources Information Center

    Bing-ru, Teh; Chiang, Hanley; Lipscomb, Stephen; Gill, Brian

    2014-01-01

    A new study analyzed data from the 2012/13 pilot of the Framework for Leadership (FFL), Pennsylvania's tool for evaluating the leadership practices of principals and assistant principals. Based on the FFL scores of 336 principals and 69 assistant principals evaluated by their supervisors in the 2012/13 school year, this interim report found that…

  18. The SpringBoard Bursary Foundation Impact Assessment: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Buchanan, Emily; Stevens, Eleanor; Straw, Suzanne

    2014-01-01

    The SpringBoard Bursary Foundation (SpringBoard) commissioned the National Foundation for Education Research (NFER) to undertake an evaluation of its activities and impacts between 2013 and 2018. This interim and summary report presents the findings of the first year of the evaluation. SpringBoard was established in 2012 to transform the lives of…

  19. Alternatives generation and analysis report for immobilized low-level waste interim storage architecture

    SciTech Connect

    Burbank, D.A., Westinghouse Hanford

    1996-09-01

    The Immobilized Low-Level Waste Interim Storage subproject will provide storage capacity for immobilized low-level waste product sold to the U.S. Department of Energy by the privatization contractor. This report describes alternative Immobilized Low-Level Waste storage system architectures, evaluation criteria, and evaluation results to support the Immobilized Low-Level Waste storage system architecture selection decision process.

  20. Flammability, Offgassing, and Compatibility Requirements and Test Procedures. Interim NASA Technical Standard

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.

  1. Multipurpose bus interface utilizing a digital signal processor

    NASA Astrophysics Data System (ADS)

    Houlberg, Christian L.

    1994-09-01

    A multi-purpose bus interface comprising a digital signal processor which receives a clock signal and control signals from a Manchester type encoder/decoder and then processes the clock and control signals allowing for the serial transfer of data to and from the 1553 multiplex data bus, the encoder/decoder and the digital signal processor into an IC memory card for storage in or retrieval from the IC memory card. Software stored in an electrically erasable programmable read only memory controls how the data is transferred and interpreted making it easier to modify the digital signal processor's operation to accommodate its use with different bus standards and data protocols/formats. The encoder/decoder of the present invention formats and protocols data transferred from the electrically erasable programmable read only memory to the 1553 multiplex data bus as well data transferred from the 1553 multiplex data bus to the memory, as appropriate. The multipurpose bus interface of the present invention also includes an RS-232 interface and an RS-422 interface controlled by the digital signal processor which provides for data transfer to and from a host computer or the like into the IC memory card.

  2. Space shuttle SRM interim contract, part 1

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Essential studies and analyses required to integrate the SRM into the booster and overall space shuttle system. Emphasis was placed on the case, nozzle, insulation, and propellant components with resulting performance, weight, and structural load characteristics being generated. Effort conducted during the time period of this contract included studies, analyses, planning, and preliminary design activities. Technical requirements identified in the SRM Project Request for Proposal No. 8-1-4-94-98401 and Thiokol's proposed SRM design (designated Configuration 0) established the basis for this effort. The requirements were evaluated jointly with MSFC and altered where necessary to incorporate new information that evolved after issuance of the RFP and during the course of this interim contract. Revised water impact loads and load distributions were provided based on additional model test data and analytical effort conducted by NASA subsequent to the RFP release. Launch pad peaking loads into the SRM aft skirt were provided which also represented a change from RFP requirements. A modified SRM/External Tank (ET) attachment configuration with new structural load data was supplied by NASA, and direction was received to include a 2 percent inert weight contingency.

  3. Testing of Environmental Satellite Bus-Instrument Interfaces Using Engineering Models

    NASA Technical Reports Server (NTRS)

    Gagnier, Don; Hayner, Rick; Roza, Michael; Nosek, Thomas; Razzaghi, Andrea

    2004-01-01

    This paper discusses the formulation and execution of a laboratory test of the electrical interfaces between multiple atmospheric science instruments and the spacecraft bus that carries them. The testing, performed in 2002, used engineering models of the instruments that will be flown on the Aura s p a c m and of the Aura spacecraft bus electronics. Aura is one of NASA's Earth Observing System @OS) Program missions managed by the Goddard Space Flight Center. The test was designed to evaluate the complex interfaces in the spacecraft and instrument command and data handling (C&DH) subsystems prior to integration of the complete flight instruments on the spacecraft. A problem discovered during (and not before) the flight hardware integration phase can cause significant cost and schedule impacts. The testing successfully surfaced problems and led to their resolution before the full-up integration phase, saving significant cost and schedule time. This approach could be used on future environmental satellite programs involving multiple, complex scientific instruments being integrated onto a bus.

  4. Bias of averages in life-cycle footprinting of infrastructure: truck and bus case studies.

    PubMed

    Taptich, Michael N; Horvath, Arpad

    2014-11-18

    The life-cycle output (e.g., level of service) of infrastructure systems heavily influences their normalized environmental footprint. Many studies and tools calculate emission factors based on average productivity; however, the performance of these systems varies over time and space. We evaluate the appropriate use of emission factors based on average levels of service by comparing them to those reflecting a distribution of system outputs. For the provision of truck and bus services where fuel economy is assumed constant over levels of service, emission factor estimation biases, described by Jensen's inequality, always result in larger-than-expected environmental impacts (3%-400%) and depend strongly on the variability and skew of truck payloads and bus ridership. Well-to-wheel greenhouse gas emission factors for diesel trucks in California range from 87 to 1,500 g of CO2 equivalents per ton-km, depending on the size and type of trucks and the services performed. Along a bus route in San Francisco, well-to-wheel emission factors ranged between 53 and 940 g of CO2 equivalents per passenger-km. The use of biased emission factors can have profound effects on various policy decisions. If average emission rates must be used, reflecting a distribution of productivity can reduce emission factor biases. PMID:25321067

  5. Combined Simulated Annealing and Genetic Algorithm Approach to Bus Network Design

    NASA Astrophysics Data System (ADS)

    Liu, Li; Olszewski, Piotr; Goh, Pong-Chai

    A new method - combined simulated annealing (SA) and genetic algorithm (GA) approach is proposed to solve the problem of bus route design and frequency setting for a given road network with fixed bus stop locations and fixed travel demand. The method involves two steps: a set of candidate routes is generated first and then the best subset of these routes is selected by the combined SA and GA procedure. SA is the main process to search for a better solution to minimize the total system cost, comprising user and operator costs. GA is used as a sub-process to generate new solutions. Bus demand assignment on two alternative paths is performed at the solution evaluation stage. The method was implemented on four theoretical grid networks of different size and a benchmark network. Several GA operators (crossover and mutation) were utilized and tested for their effectiveness. The results show that the proposed method can efficiently converge to the optimal solution on a small network but computation time increases significantly with network size. The method can also be used for other transport operation management problems.

  6. Low-floor bus design preferences of walking aid users during simulated boarding and alighting.

    PubMed

    D'souza, Clive; Paquet, Victor; Lenker, James; Steinfeld, Edward; Bareria, Piyush

    2012-01-01

    Low-floor buses represent a significant improvement in accessible public transit for passengers with limited mobility. However, there is still a need for research on the inclusive design of transit buses to identify specific low-floor bus design conditions that are either particularly accommodating or challenging for passengers with functional and mobility impairments. These include doorway locations, seating configuration and the large front wheel-well covers that collectively impact boarding, alighting and interior movement of passengers. Findings from a laboratory study using a static full-scale simulation of a lowfloor bus to evaluate the impact of seating configuration and crowding on interior movement and accessibility for individuals with and without walking aids are presented (n=41). Simulated bus journeys that included boarding, fare payment, seating, and alighting were performed. Results from video observations and subjective assessments showed differences in boarding and alighting performance and users' perceptions of task difficulty. The need for assistive design features (e.g. handholds, stanchions), legroom and stowage space for walking aids was evident. These results demonstrate that specific design conditions in low-floor buses can significantly impact design preference among those who use walking aids. Consideration of ergonomics and inclusive design can therefore be used to improve the design of low-floor buses. PMID:22317485

  7. Methods Data Qualification Interim Report

    SciTech Connect

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  8. Improvement of multiprocessing performance by using optical centralized shared bus

    NASA Astrophysics Data System (ADS)

    Han, Xuliang; Chen, Ray T.

    2004-06-01

    With the ever-increasing need to solve larger and more complex problems, multiprocessing is attracting more and more research efforts. One of the challenges facing the multiprocessor designers is to fulfill in an effective manner the communications among the processes running in parallel on multiple multiprocessors. The conventional electrical backplane bus provides narrow bandwidth as restricted by the physical limitations of electrical interconnects. In the electrical domain, in order to operate at high frequency, the backplane topology has been changed from the simple shared bus to the complicated switched medium. However, the switched medium is an indirect network. It cannot support multicast/broadcast as effectively as the shared bus. Besides the additional latency of going through the intermediate switching nodes, signal routing introduces substantial delay and considerable system complexity. Alternatively, optics has been well known for its interconnect capability. Therefore, it has become imperative to investigate how to improve multiprocessing performance by utilizing optical interconnects. From the implementation standpoint, the existing optical technologies still cannot fulfill the intelligent functions that a switch fabric should provide as effectively as their electronic counterparts. Thus, an innovative optical technology that can provide sufficient bandwidth capacity, while at the same time, retaining the essential merits of the shared bus topology, is highly desirable for the multiprocessing performance improvement. In this paper, the optical centralized shared bus is proposed for use in the multiprocessing systems. This novel optical interconnect architecture not only utilizes the beneficial characteristics of optics, but also retains the desirable properties of the shared bus topology. Meanwhile, from the architecture standpoint, it fits well in the centralized shared-memory multiprocessing scheme. Therefore, a smooth migration with substantial

  9. Design review report FFTF interim storage cask

    SciTech Connect

    Scott, P.L.

    1995-01-03

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location.

  10. CMM Interim Check Design of Experiments (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  11. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term interim Federal savings association means a Federal savings association chartered by the Office...

  12. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term interim Federal savings association means a Federal savings association chartered by the Office...

  13. 12 CFR 541.19 - Interim state savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim state savings association. 541.19... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.19 Interim state savings association. The term interim state savings association means a savings association, other than a Federal savings...

  14. 12 CFR 541.19 - Interim state savings association.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Interim state savings association. 541.19... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.19 Interim state savings association. The term interim state savings association means a savings association, other than a Federal savings...

  15. 33 CFR 1.05-45 - Interim rule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Interim rule. 1.05-45 Section 1... PROVISIONS Rulemaking § 1.05-45 Interim rule. (a) An interim rule may be issued when it is in the public interest to promulgate an effective rule while keeping the rulemaking open for further refinement....

  16. 33 CFR 1.05-45 - Interim rule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Interim rule. 1.05-45 Section 1... PROVISIONS Rulemaking § 1.05-45 Interim rule. (a) An interim rule may be issued when it is in the public interest to promulgate an effective rule while keeping the rulemaking open for further refinement....

  17. 33 CFR 1.05-45 - Interim rule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Interim rule. 1.05-45 Section 1... PROVISIONS Rulemaking § 1.05-45 Interim rule. (a) An interim rule may be issued when it is in the public interest to promulgate an effective rule while keeping the rulemaking open for further refinement....

  18. 33 CFR 1.05-45 - Interim rule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Interim rule. 1.05-45 Section 1... PROVISIONS Rulemaking § 1.05-45 Interim rule. (a) An interim rule may be issued when it is in the public interest to promulgate an effective rule while keeping the rulemaking open for further refinement....

  19. 33 CFR 1.05-45 - Interim rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim rule. 1.05-45 Section 1... PROVISIONS Rulemaking § 1.05-45 Interim rule. (a) An interim rule may be issued when it is in the public interest to promulgate an effective rule while keeping the rulemaking open for further refinement....

  20. 5 CFR 531.414 - Interim within-grade increase.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Interim within-grade increase. 531.414... UNDER THE GENERAL SCHEDULE Within-Grade Increases § 531.414 Interim within-grade increase. (a) An interim within-grade increase shall be granted to an employee who has: (1) Appealed a negative...

  1. 5 CFR 531.414 - Interim within-grade increase.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Interim within-grade increase. 531.414... UNDER THE GENERAL SCHEDULE Within-Grade Increases § 531.414 Interim within-grade increase. (a) An interim within-grade increase shall be granted to an employee who has: (1) Appealed a negative...

  2. 5 CFR 531.414 - Interim within-grade increase.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Interim within-grade increase. 531.414... UNDER THE GENERAL SCHEDULE Within-Grade Increases § 531.414 Interim within-grade increase. (a) An interim within-grade increase shall be granted to an employee who has: (1) Appealed a negative...

  3. 5 CFR 531.414 - Interim within-grade increase.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Interim within-grade increase. 531.414... UNDER THE GENERAL SCHEDULE Within-Grade Increases § 531.414 Interim within-grade increase. (a) An interim within-grade increase shall be granted to an employee who has: (1) Appealed a negative...

  4. 5 CFR 531.414 - Interim within-grade increase.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Interim within-grade increase. 531.414... UNDER THE GENERAL SCHEDULE Within-Grade Increases § 531.414 Interim within-grade increase. (a) An interim within-grade increase shall be granted to an employee who has: (1) Appealed a negative...

  5. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or applicant for employment appeals an action to MSPB...

  6. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  7. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  8. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or applicant for employment appeals an action to MSPB...

  9. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is established pursuant to this part shall be deemed to have been amended on the first day of the...

  10. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Interim hybrid IBOC DAB operation. 73.404... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with...

  11. 200 Area Interim Storage Area Technical Safety Requirements

    SciTech Connect

    CARRELL, R.D.

    2000-03-15

    The 200 Area Interim Storage Area Technical Safety Requirements define administrative controls and design features required to ensure safe operation during receipt and storage of canisters containing spent nuclear fuel. This document is based on the 200 Area Interim Storage Area, Annex D, Final Safety Analysis Report which contains information specific to the 200 Area Interim Storage Area.

  12. Fly-by-light optical bus interface module (OBIM)

    NASA Astrophysics Data System (ADS)

    Gargano, Robert

    1995-05-01

    Driving the need for optics in flight control are the issues of wire weight, HIRF, and system bandwidth. With the advent of advanced Vehicle Management System (VMS) systems and the higher level of functional and physical integration of subsystems such as the More Electric Aircraft (MEA) and the Subsystem Utility Integration Technology (SUIT) program, optics in flight control offer attractive system benefits. Advanced VMS control functions generate large quantities of data to be transmitted over the VMS buses for processing. This paper will address the implementation of a module that will support the high throughput requirements of an advanced VMS system. The module is defined as the Optical Bus Interface Module (OBIM) and utilizes the AS1773A 20 mbps fiber optic bus for the VMS system bus. In addition, the module supports 5 mbps fiber optic Cross Channel Data Links (CCDLs) for the exchange of flight critical data in redundant architectures.

  13. High Performance BDR for the PCU of AlphaBus

    NASA Astrophysics Data System (ADS)

    Subrier, Laurent; Besdel, Patrick; Daubresse, Thierry; Trehet, Eric

    2008-09-01

    Very high-power satellites for Telecom missions require 100V bus. Some Telecom payloads may be used in TDMA mode with a power modulation up to 30% of the Payload power. Full performance of the PCU is required in this case even in eclipse mode. It is clear that this requirement is very demanding especially for the BDR design.100V bus system leads making this requirement more difficult as Bus and Battery short-circuit protections have to operate under a voltage of 100V. This paper describes first the overall BDR design with a special focus on the innovative battery short-circuit protection that is not achieved by a "classical" series SSPC on the battery line.The constraints brought by the TDMA mode are detailed, especially on the input filter of the BDR in presence of large battery inductance. The solution developed to cope with large TDMA current is then presented with the associated TDMA performance.

  14. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  15. Prospects: The Congressionally Mandated Study of Educational Growth and Opportunity. The Interim Report.

    ERIC Educational Resources Information Center

    Puma, Michael J.; And Others

    This publication is the first interim report from the Congressionally Mandated Study of Educational Growth and Opportunity (Prospects), and describes students' characteristics and the schools they attend. Prospects is designed to evaluate the short- and long-term consequences of Chapter 1 program participation by following for 5 years large…

  16. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  17. Engineering report single-shell tank farms interim measures to limit infiltration through the vadose zone

    SciTech Connect

    HAASS, C.C.

    1999-10-14

    Identifies, evaluates and recommends interim measures for reducing or eliminating water sources and preferential pathways within the vadose zone of the single-shell tank farms. Features studied: surface water infiltration and leaking water lines that provide recharge moisture, and wells that could provide pathways for contaminant migration. An extensive data base, maps, recommended mitigations, and rough order of magnitude costs are included.

  18. Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…

  19. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... provided to the NRC on May 6, 2011. On September 30, 2011 (76 FR 60937), the NRC published a request for... COMMISSION Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory... Program for Steam Generators.'' This LR-ISG provides the NRC staff's evaluation of the suitability...

  20. Systematic Method for Evaluating Extraction and Injection Flow Rates for 100-KR-4 and 100-HR-3 Groundwater Operable Unit Pump-and-Treat Interim Actions for Hydraulic Containment

    SciTech Connect

    Spiliotopoulos, Alexandros A.

    2013-03-20

    This document describes a systematic method to develop flow rate recommendations for Pump-and-Treat (P&T) extraction and injection wells in 100-KR-4 and 100-HR-3 Groundwater Operable Units (OU) of the Hanford Site. Flow rate recommendations are developed as part of ongoing performance monitoring and remedy optimization of the P&T interim actions to develop hydraulic contairnnent of the dissolved chromium plume in groundwater and protect the Columbia River from further discharges of groundwater from inland. This document details the methodology and data required to infer the influence of individual wells near the shoreline on hydraulic containment and river protection and develop flow rate recommendations to improve system performance and mitigate potential shortcomings of the system configuration in place.

  1. NATO/CCMS pilot study: Evaluation of demonstrated and emerging technologies for the treatment and clean up of contaminated land and groundwater (phase 2). Interim status report number 203

    SciTech Connect

    1995-05-01

    The document provides an interim status report on the second phase of a Pilot Study designed to share information among countries on innovative treatment technologies. The report is divided into four parts. The first part contains abstracts of each of the technical case studies sanctioned by the Pilot Study prior to September 1994. The second part of the report contains preliminary information on 15 projects newly accepted by the Pilot Study in September 1994. The table on page 30 provides an overview of these projects. The third part contains summaries of guest presentations of general interest made at Pilot Study meetings. The fourth section of the report contains a brief description of NATO fellowships projects.

  2. Loss of interim status (LOIS) under RCRA. RCRA Information Brief

    SciTech Connect

    Not Available

    1992-09-01

    The Resource Conservation and Recovery Act (RCRA) requires owners and operators of facilities that treat store, or disposal of hazardous waste (TSDFs) to obtain an operating permit. Recognizing that it would take EPA many years to issue operating permits to all RCRA facilities, Congress created ``interim status`` under Section 3005(e) of the Act. Interim status allows facilities to operate under Subtitle C of RCRA until their permits are issued or denied. This information brief defines interim status and describes how failure to meet interim status requirements may lead to loss of interim status (LOIS).

  3. FIP Interim Review Project. Final Report.

    ERIC Educational Resources Information Center

    Whitbeck, John K.

    The Family Independence Project (FIP) Interim Review Project in Washington was mounted in order to give preliminary information on the progress of the FIP program compared to Assistance for Families with Dependent Children (AFDC) site activity, for management planning, and to document short-term outcomes and trends for policy considerations. A…

  4. 12 CFR 268.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Interim relief. 268.505 Section 268.505 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM RULES..., eligibility for a within-grade increase, or the completion of the service requirement for career tenure,...

  5. 40 CFR 1036.150 - Interim provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Interim provisions. 1036.150 Section... definition of spark-ignition, but regulated as diesel engines under 40 CFR part 86, must be certified to the... compression-ignition, but regulated as Otto-cycle under 40 CFR part 86 must be certified to the...

  6. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE...

  7. 29 CFR 1614.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL EMPLOYMENT OPPORTUNITY Remedies and Enforcement § 1614.505 Interim relief. (a)(1) When the agency appeals and the case... the complainant, decline to return the complainant to his or her place of employment if it...

  8. INTERIM METHOD FOR DETERMINING ASBESTOS IN WATER

    EPA Science Inventory

    This manual describes an interim electron microscope (EM) procedure for measuring the concentration of asbestos in water samples. The main features of the method include filtering the sample through a sub-micron polycarbonate membrane filter, examining an EM specimen grid in a tr...

  9. Diversified Satellite Occupations Program. Interim Report.

    ERIC Educational Resources Information Center

    Call, John Reed

    This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…

  10. Secretarial Science Occupational Performance Survey. Interim Report.

    ERIC Educational Resources Information Center

    Borcher, Sidney D.; Joyner, John W.

    Intended for the use of curriculum developers, instructors, and others concerned with planning and conducting vocational and technical education programs, this federally funded interim report presents the results of the task inventory analysis survey conducted by the project staff in the secretarial science occupations. In order to develop a…

  11. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Interim goals. 385.38 Section 385.38 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN Ensuring Protection of the Natural System and Water...

  12. Disposal facility data for the interim performance

    SciTech Connect

    Eiholzer, C.R.

    1995-05-15

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 {times} 2 {times} 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs.

  13. The Sustaining Effects Study: An Interim Report.

    ERIC Educational Resources Information Center

    Carter, Launor F.

    This interim report summarizes the procedures and results of the Sustaining Effects Study (SES) on Compensatory Education, conducted at selected elementary schools during the 1967-77 school year. Data from the study are presented for the following findings: (1) poor and educationally needy children are the principal recipients of Compensatory…

  14. Chapter 1 Commission Issues Interim Report.

    ERIC Educational Resources Information Center

    Commission on Chapter 1, Baltimore, MD.

    This report presents an interim analysis by an independent commission of current moves to reform Chapter 1 of the Hawkins/Stafford Elementary and Secondary School Improvement Amendments of 1988. Chapter 1 is the largest federal assistance program to elementary school and secondary school education. The report responds to questions on strengthening…

  15. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to...

  16. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to...

  17. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to...

  18. Models in Remedial English: An Interim Report.

    ERIC Educational Resources Information Center

    Larmouth, Donald W.

    1970-01-01

    The experimental program in remedial composition described in this interim report was designed on the assumption that students could best learn to write minimally acceptable compositions by imitating paragraph and essay models which have been divided into a series of incremental steps. The objectives of the program were to develop a heuristic…

  19. 29 CFR 1614.505 - Interim relief.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL EMPLOYMENT... interim relief. (2) Service under the temporary or conditional restoration provisions of paragraph (a)(1..., eligibility for a within-grade increase, or the completion of the service requirement for career tenure,...

  20. 340 waste handling facility interim safety basis

    SciTech Connect

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  1. 340 Waste handling facility interim safety basis

    SciTech Connect

    Stordeur, R.T.

    1996-10-04

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  2. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification...

  3. A Non-Traditional Interim Project.

    ERIC Educational Resources Information Center

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  4. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Interim reports. 908.5 Section 908.5 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS MAINTAINING REC- ORDS AND SUBMITTING REPORTS ON WEATHER...

  5. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    EPA Science Inventory

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  6. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Technical Reports Server (NTRS)

    2008-01-01

    In 2004 NASA initiated studies of advanced science mission concepts known as the Vision Missions and inspired by a series of NASA roadmap activities conducted in 2003. Also in 2004 NASA began implementation of the first phases of a new space exploration policy, the Vision for Space Exploration. This implementation effort included development of a new human-carrying spacecraft, known as Orion, and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System. NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System (see Preface) and to produce an interim report on a short time schedule and a final report by November 2008. The committee notes, however, that the Constellation System and its Orion and Ares vehicles have been justified by NASA and selected in order to enable human exploration beyond low Earth orbit, and not to enable science missions. This interim report of the Committee on Science Opportunities Enabled by NASA s Constellation System evaluates the 11 Vision Mission studies presented to it and groups them into two categories: those more deserving of future study, and those less deserving of future study. Although its statement of task also refers to Earth science missions, the committee points out that the Vision Missions effort was focused on future astronomy, heliophysics, and planetary exploration and did not include any Earth science studies because, at the time, the NRC was conducting the first Earth science decadal survey, and funding Earth science studies as part of the Vision Missions effort would have interfered with that process. Consequently, no Earth science missions are evaluated in this interim report. However, the committee will evaluate any Earth science mission proposal submitted in response to its request for information issued in March 2008 (see Appendix A). The committee based its evaluation of the preexisting Vision Missions studies

  7. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Tests To Be Performed at the Bus Testing Facility A Appendix A to Part 665 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Pt. 665, App. A Appendix A to Part 665—Tests To Be Performed at the Bus...

  8. Behavior Modification of Aggressive Behavior on a Nursery School Bus: A Case Study.1

    ERIC Educational Resources Information Center

    Whitehurst, Carol; Miller, Edward

    1973-01-01

    A case study is presented in which aggressive behavior of two pre-school boys on a nursery school bus was modified by the introduction of a negative punishment contingency in which the Ss were told they would be detained on the bus until the second time the bus passed their house (delay of reinforcement) if abusive behavior occurred. (Author)

  9. Fiber optic data bus using Frequency Division Multiplexing (FDM) and an asymmetric coupler

    NASA Technical Reports Server (NTRS)

    Zanger, M.; Webster, L.

    1984-01-01

    A fiber optic data bus, using frequency division multiplexing (FDM) is discussed. The use of FDM is motivated by the need to avoid central control of the bus operation. A major difficulty of such a data bus is introduced by the couplers. An efficient low loss access coupler with an asymmetric structure is presented, and manufacturing processes for the coupler are proposed.

  10. Computer Based Techniques for School Bus Routing. Working Paper Series No. WP060690.

    ERIC Educational Resources Information Center

    Osborne, Kimberly A.; And Others

    This report details the data requirements and procedures used to develop new school bus routes for Six Mile Elementary School in South Carolina. The project examined the current routes of the school and applied computer based techniques to develop new routes given the existing bus stops. Bus routes were developed so that distance and travel time…

  11. Bus Operations for Pupil Transportation. "Chrome-Yellow and Red Lights."

    ERIC Educational Resources Information Center

    Rannels, Morris W.

    This paper is based on a committee report of the last National School Bus Conference on "Minimum Standards for School Buses." Standards for school bus operations are included for (1) administrators, (2) supervisors, (3) school bus drivers, (4) student passengers, and (5) maintenance and service personnel. The report deals also with procedures for…

  12. School Bus Safety: What Can Our Schools Do to Protect Our Children?

    ERIC Educational Resources Information Center

    Dargan, Thomas J.; Silverstone, Adam H.

    2014-01-01

    School districts and school bus contractors are entrusted with the most important of all road users--our nation's children. In the wake of recent newsworthy accidents and attention grabbing headlines regarding unfit bus drivers, claims premised upon school bus accidents have become increasingly tangential and, in turn, personal injury attorneys…

  13. Instructor's Behind-the-Wheel Guide for California's Bus Driver's Training Course.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento.

    Intended to help produce safe, competent California school bus drivers, this document contains instructor's materials for a bus driver education course with eight sequential skill levels, including a final appraisal. The first section contains the curriculum's purpose and objectives, the California standards for a state-certified bus driver…

  14. Beware of high stresses in ``A`` frame supported two-level bus structures

    SciTech Connect

    Thaik, A.

    1995-10-01

    Rigid-bus structures in many low profile, high voltage transmission substations consist of two-level bus assemblies of tubular conductors with one bus assembly supporting the other bus assembly with rigid tubular ``A`` frames at the crossover points. The lower-level bus is normally supported by a single porcelain post insulator under the ``A`` frame. Rigid ``A`` frames not only support the upper-level bus assembly, but also make the electrical connections between the two buses. This paper addresses the stress problem in the lower-level bus of the two-level bus structure. It presents the results of the structural analysis of a sample two-level bus structure using a simple structural method based on the Three Moment Theorem and equilibrium equations. A spreadsheet template is used to perform the mathematical calculations. The spreadsheet first calculates the maximum allowable bus span length in accordance with the IEEE Standard 605 and then determines the internal stress on the upper and lower-level bus conductors in the two-level rigid bus structures.

  15. School Bus Rider Safety Education Modules for Use with Drills on School Buses.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Div. of Physical Education, Fitness, Health, Nutrition and Safety Services.

    Developed for teachers and members of the pupil transportation staff who conduct school bus drills, these 10 lesson outlines are intended for classroom instruction on school bus safety. Lessons may be adapted to fit the grade level, intelligence, and special needs of students. Topics covered are: preparing to ride the bus, boarding and proceeding…

  16. THE DEVELOPMENT OF MODE-CHOICE SIMULATOR WITH THE LOG DATA ACCUMULATED IN ON-DEMAND BUS SERVER

    NASA Astrophysics Data System (ADS)

    Tsubouchi, Kota; Yamato, Hiroyuki; Hiekata, Kazuo

    The new simulator which can estimate the mode-choi ce in the area was developed and evaluated in the field test. The characteristic of the developed simulato r is to be able to estimate the number of demand and demand pattern in high-accuracy with the real operation log data of the On-demand Bus. The simulator is devided into micro-simulator whose passenger agents choose their transpor t mode by the sacrifice model. The developed simulator is evaluated in the real fi eld test in Sakai City, Osaka Prefecture. The new transportation like LRT (Light Rail Transit) and On-demand Bus is eval uated by the simulator and the result of simulation is confirmed to be reliable by the local government officers.

  17. Comparisons of polar processing diagnostics from 34 years of the ERA-Interim and MERRA reanalyses

    NASA Astrophysics Data System (ADS)

    Lawrence, Z. D.; Manney, G. L.; Minschwaner, K.; Santee, M. L.; Lambert, A.

    2015-04-01

    We present a comprehensive comparison of polar processing diagnostics derived from the National Aeronautics and Space Administration (NASA) Modern Era Retrospective-analysis for Research and Applications (MERRA) and the European Centre for Medium-Range Weather Forecasts (ECMWF) Interim Reanalysis (ERA-Interim). We use diagnostics that focus on meteorological conditions related to stratospheric chemical ozone loss based on temperatures, polar vortex dynamics, and air parcel trajectories to evaluate the effects these reanalyses might have on polar processing studies. Our results show that the agreement between MERRA and ERA-Interim changes significantly over the 34 years from 1979 to 2013 in both hemispheres and in many cases improves. By comparing our diagnostics during five time periods when an increasing number of higher-quality observations were brought into these reanalyses, we show how changes in the data assimilation systems (DAS) of MERRA and ERA-Interim affected their meteorological data. Many of our stratospheric temperature diagnostics show a convergence toward significantly better agreement, in both hemispheres, after 2001 when Aqua and GOES (Geostationary Operational Environmental Satellite) radiances were introduced into the DAS. Other diagnostics, such as the winter mean volume of air with temperatures below polar stratospheric cloud formation thresholds (VPSC) and some diagnostics of polar vortex size and strength, do not show improved agreement between the two reanalyses in recent years when data inputs into the DAS were more comprehensive. The polar processing diagnostics calculated from MERRA and ERA-Interim agree much better than those calculated from earlier reanalysis data sets. We still, however, see fairly large differences in many of the diagnostics in years prior to 2002, raising the possibility that the choice of one reanalysis over another could significantly influence the results of polar processing studies. After 2002, we see overall

  18. Manual for the Instruction of School Bus Drivers.

    ERIC Educational Resources Information Center

    Stewart, Otto J., Comp.

    In answer to requests from numerous school and safety officials throughout the State, a manual for the instruction of school bus drivers was prepared; with 2,000,000 pupils in 20,000 vehicles being transported daily during a school year, the State of New York realizes the necessity for correct safety procedures to be well defined for those…

  19. Augmented thermal bus wih multiple thermoelectric devices individually controlled

    NASA Technical Reports Server (NTRS)

    Schrage, Dean S. (Inventor)

    1994-01-01

    The present invention is directed to an augmented thermal bus. In the present design a plurality of thermo-electric heat pumps are used to couple a source plate to a sink plate. Each heat pump is individually controlled by a model based controller. The controller coordinates the heat pumps to maintain isothermality in the source.

  20. Improving School Bus Safety. Transportation Research Board Special Report 222.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Transportation Research Board.

    While school buses transport more passengers per trip, the rate of occupant fatalities per mile driven for school buses is one-quarter that for passenger cars. Nevertheless, the public expects school districts and other school bus operators to take all reasonable precautions to protect children as they travel to and from school. Although a variety…

  1. What's Happening on the School Bus Performance Front?

    ERIC Educational Resources Information Center

    Combs, Hanford L.

    The most urgent order of business in the national scene is to complete the development of a series of new performance tests for school bus bodies and chassis to establish a benchmark for safe construction that can be verified by independent testing agencies. Such performance tests should incorporate the new Federal Joint Strength Efficiency…

  2. Course Guide for School Bus Driver Training in Texas. Revised.

    ERIC Educational Resources Information Center

    Texas State Dept. of Public Safety, Austin.

    The safe and effective transportation of pupils to and from schol is an integral part of a sound educational program. This course guide is a study and reference tool for use in a training course designed to promote the competency of school bus drivers throughout the State of Texas. Unit 1 of the guide provides an overview of the transportation…

  3. 38. Photocopy of photograph (Pentran file), photographer unknown. Bus garage ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photocopy of photograph (Pentran file), photographer unknown. Bus garage to left now demolished. Trolley car drivers, maintenance personnel and management staff in 1915. VIEW SOUTH - Newport News & Old Point Railway & Electric Company, Trolley Barn & Administration Building, 3400 Victoria Boulevard, Hampton, Hampton, VA

  4. 45 CFR 1310.17 - Driver and bus monitor training.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Driver and bus monitor training. 1310.17 Section 1310.17 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM HEAD START...

  5. High-Tech School Bus Teaches Students on the Road

    ERIC Educational Resources Information Center

    Katims, Lauren

    2011-01-01

    Last year, kindergarten through high school students in the rural Hector, Arkansas, School District barely had the technology resources that keep kids interested in math and science. This year, they potentially have the most advanced resources in the country--before they even step into the classroom. One school bus in Arkansas' Pope County has…

  6. Cascaded Amplifying Quantum Optical Taps: A Robust Noiseless Optical Bus

    SciTech Connect

    Bencheikh, K.; Simonneau, C.; Levenson, J.A.

    1997-01-01

    Two identical amplifying quantum optical taps, based on noiseless optical parametric amplification and twin beam quantum correlation, have been implemented in a series configuration and experimentally investigated. The result is an optical bus which we have shown to be robust with respect to downstream losses. {copyright} {ital 1996} {ital The American Physical Society}

  7. 45 CFR 1310.17 - Driver and bus monitor training.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with Disabilities (45 CFR 1308) relating to transportation services for children with disabilities. (d... 45 Public Welfare 4 2010-10-01 2010-10-01 false Driver and bus monitor training. 1310.17 Section 1310.17 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN...

  8. The Diagnostic and Predictive Validity of "The Renfrew Bus Story"

    ERIC Educational Resources Information Center

    Pankratz, Mary E.; Plante, Elena; Vance, Rebecca; Insalaco, Deborah M.

    2007-01-01

    Purpose: Two studies are presented providing evidence indicating the diagnostic and predictive validity of the American version of "The Renfrew Bus Story" (J. Cowley & C. Glasgow, 1994). Method: Thirty-two children with specific language impairment (SLI) and 32 children with typical language development participated in the first study to determine…

  9. Interface For MIL-STD-1553B Data Bus

    NASA Technical Reports Server (NTRS)

    Davies, Bryan L.; Osborn, Stephen H.; Sullender, Craig C.

    1993-01-01

    Electronic control-logic subsystem acts as interface between microcontroller and MIL-STD-1553B data bus. Subsystem made of relatively small number of integrated circuits. Advantages include low power, few integrated-circuit chips, and little need for control signals.

  10. Schools, Computers Solve 'Mind Boggling' Bus Transport Problem

    ERIC Educational Resources Information Center

    Griggs, Norman; Morgan, Larry

    1975-01-01

    Describes a districtwide effort to select and implement a computerized system that could compile and maintain student census data, in addition to redesigning the district's school bus routes to better accommodate a growing student population without increasing the number of buses in service. (JG)

  11. Training Needs Analysis for Bus Depot Managers at GSRTC

    ERIC Educational Resources Information Center

    Shah, Hardik; Gopal, Raj

    2012-01-01

    Purpose: With rapid industrialization and population growth in the urban and rural areas in India, the demand for public transport has risen sharply. In the fast changing scenario in the public transit sector, the role of a bus depot manager (DM) has also undergone substantial transformation. This paper aims to identify and gauge the…

  12. Manual of First Aid Practices for School Bus Drivers.

    ERIC Educational Resources Information Center

    Nesbitt, William R.

    This manual is intended to assist local school authorities in California in providing the required course in instruction in first aid practices for school bus drivers. While it deals with basic principles of handling serious medical emergencies, major emphasis is on minor injuries or illnesses that are most likely to occur while students are…

  13. How to Cut Costs by Saving School Bus Fuel.

    ERIC Educational Resources Information Center

    Seiff, Hank

    A program started in Washington County, Maryland in 1980 has been successful in saving school bus fuel and bringing down transportation costs incurred by its fleet of 200 buses. Driver training and motivation, as well as a partial transfer to diesel buses, are at the heart of the program. The drivers are taught five fuel saving techniques: cut…

  14. Long School Bus Rides: Stealing the Joy of Childhood.

    ERIC Educational Resources Information Center

    Spence, Beth

    Every school day, hundreds of West Virginia children ride school buses much longer than state guidelines say they should. Under those guidelines, no elementary student should be on the bus more than 30 minutes one way, middle school students 45 minutes, and high school students 1 hour. In fall 1999, public hearings about school transportation…

  15. Issues in School Bus Safety: Real or Red Herring?

    ERIC Educational Resources Information Center

    Leeds, Robin L.

    1999-01-01

    In many states, the greatest threat to safe student transportation is elimination of the school transportation program. Using public transit buses, large vans, smaller vehicles, or specialized equipment can cause major-issue headaches. False issues include controversies over seat belts, bus design, and optional "bells and whistles." (10…

  16. Training for School Bus Safety. Technical Assistance Bulletin 30.

    ERIC Educational Resources Information Center

    National School Resource Network, Washington, DC.

    School bus safety depends as much on responsible students as it does on competent drivers. Periodic on-the-job training is necessary to maintain and increase driver skills in handling buses and pupil passenger behavior. Similarly, continuing instruction on safety rules and the need for personal responsibility for those rules is needed to promote…

  17. Implementation of a Walking School Bus: Lessons Learned

    ERIC Educational Resources Information Center

    Kong, Alberta S.; Sussman, Andrew L.; Negrete, Sylvia; Patterson, Nissa; Mittleman, Rachel; Hough, Richard

    2009-01-01

    Background: Obesity is rapidly becoming the most common chronic medical condition affecting children. To address this crisis, an Albuquerque, New Mexico, elementary school partnered with University of New Mexico researchers and conducted a Walking School Bus (WSB). The purpose of this article is to examine the feasibility of implementing a WSB.…

  18. Finding maximum on an array processor with a global bus

    NASA Technical Reports Server (NTRS)

    Bokhari, S. H.

    1984-01-01

    The problem of finding the maximum of a set of values stored one/processor on an n x n array of processors is analyzed. The array has a time-shared global bus in addition to conventional processor-processor links. A two-phase algorithm for finding the maximum is presented that uses conventional links during the first phase and the global bus during the second. This algorithm is faster than algorithms that use either only the global bus or only the conventional links. Two types of interconnection patterns (the eighth nearest neighbor and the fourth nearest neighbor) are analyzed. In both cases it is shown that the time required to find the maximum using the two-phase algorithm is 0(n to the 2/3-power) assuming the propagation speed of the global bus to be a constant independent of the size of the array. In the case where the propagation speed is logarithmic in the number of processors, the time to find the maximum is 0(/n-squared log n/1/3), for both types of arrays. Extensions to q-dimensional arrays show that the two-phase algorithm is superior for any fixed value of q.

  19. Real life testing of a Hybrid PEM Fuel Cell Bus

    NASA Astrophysics Data System (ADS)

    Folkesson, Anders; Andersson, Christian; Alvfors, Per; Alaküla, Mats; Overgaard, Lars

    Fuel cells produce low quantities of local emissions, if any, and are therefore one of the most promising alternatives to internal combustion engines as the main power source in future vehicles. It is likely that urban buses will be among the first commercial applications for fuel cells in vehicles. This is due to the fact that urban buses are highly visible for the public, they contribute significantly to air pollution in urban areas, they have small limitations in weight and volume and fuelling is handled via a centralised infrastructure. Results and experiences from real life measurements of energy flows in a Scania Hybrid PEM Fuel Cell Concept Bus are presented in this paper. The tests consist of measurements during several standard duty cycles. The efficiency of the fuel cell system and of the complete vehicle are presented and discussed. The net efficiency of the fuel cell system was approximately 40% and the fuel consumption of the concept bus is between 42 and 48% lower compared to a standard Scania bus. Energy recovery by regenerative braking saves up 28% energy. Bus subsystems such as the pneumatic system for door opening, suspension and brakes, the hydraulic power steering, the 24 V grid, the water pump and the cooling fans consume approximately 7% of the energy in the fuel input or 17% of the net power output from the fuel cell system. The bus was built by a number of companies in a project partly financed by the European Commission's Joule programme. The comprehensive testing is partly financed by the Swedish programme "Den Gröna Bilen" (The Green Car). A 50 kW el fuel cell system is the power source and a high voltage battery pack works as an energy buffer and power booster. The fuel, compressed hydrogen, is stored in two high-pressure stainless steel vessels mounted on the roof of the bus. The bus has a series hybrid electric driveline with wheel hub motors with a maximum power of 100 kW. Hybrid Fuel Cell Buses have a big potential, but there are

  20. Development of the bus joint for the ITER Central Solenoid

    SciTech Connect

    Martovetsky, Nicolai N; Irick, David Kim; Kenney, Steven J

    2013-01-01

    The terminations of the Central Solenoid (CS) modules are connected to the bus extensions by joints located outside the CS in the gap between the CS and Torodial Field (TF) assemblies. These joints have very strict space limitations. Low resistance is a common requirement for all ITER joints. In addition, the CS bus joints will experience and must be designed to withstand significant variation in the magnetic field of several tenths of a Tesla per second during initiation of plasma. The joint resistance is specified to be less than 4 nOhm. The joints also have to be soldered in the field and designed with the possibility to be installed and dismantled in order to allow cold testing in the cold test facility. We have developed coaxial joints that meet these requirements and have demonstrated the feasibility to fabricate and assemble them in the vertical configuration. We introduced a coupling cylinder with superconducting strands soldered to the surface of the cable that can be installed in the ITER assembly hall and at the Cold Test Facility. This cylinder serves as a transition area between the CS module and the bus extension. We made two racetrack samples and tested four bus joints in our Joint Test Apparatus. Resistance of the bus joints was measured by a decay method and by a microvoltmeter; the value of the current was measured by the Hall probes. This measurement method was verified in the previous tests. The resistance of the joints varied insignificantly from 1.5 to 2 nOhm. One of the challenges associated with a soldered joint is the inability to use corrosive chemicals that are difficult to clean. This paper describes our development work on cable preparation, chrome removal, compaction, soldering, and final assembly and presents the test results.

  1. Interim FDG-PET Scan in Hodgkin's Lymphoma: Hopes and Caveats

    PubMed Central

    André, M.; Vander Borght, T.; Bosly, A.

    2011-01-01

    FDG-PET has recently emerged as an important tool for the management of Hodgkins lymphoma. Although its use for initial staging and response evaluation at the end of treatment is well established, the place of interim PET for response assessment and subsequent treatment tailoring is still quite controversial. The use of interim PET after a few cycles of chemotherapy may allow treatment reduction for good responders, leading to lesser treatment toxicities as well as early treatment adaptation for bad responders with a potential higher chance for cure. Interpretation of interim PET is a rapidly moving field. Actually, visual interpretation is preferred over quantitative interpretation in this situation. The notion of minimal residual uptake emerged for faint persisting FDG uptake, but has evolved during the recent years. Guidelines using mediastinum and liver as references have been proposed at the expert meeting in Deauville 2009. Actually, several trials are ongoing both for localised and advanced disease to evaluate the FDG-PET potential for early treatment monitoring and tailoring. Until the results of these prospective randomized trials become available, treatment changes according to the interim PET results should remain inappropriate and limited to well-conducted clinical trials. PMID:21234093

  2. Dynamics of dc bus networks and their stabilization by decentralized delayed feedback

    NASA Astrophysics Data System (ADS)

    Konishi, Keiji; Sugitani, Yoshiki; Hara, Naoyuki

    2015-01-01

    The present paper deals with the dynamics of bus networks, which consist of several identical dc bus systems connected by resistors. It is analytically guaranteed that the stability of a stand-alone dc bus system is equivalent to that of the networks, independent of the number of bus systems and the network topology. In addition, we show that a decentralized delayed-feedback control can stabilize an unstable operating point embedded within the networks. Moreover, this stabilization does not depend on the number of bus systems or the network topology. A systematic procedure for designing the controller is presented. Finally, the validity of the analytical results is confirmed through numerical examples.

  3. An intelligent fiberoptic data bus for fly-by-light applications

    NASA Astrophysics Data System (ADS)

    Manoharan, L. C.; Muthuvel, S.

    An active fiberoptic data bus compatible with MIL-STD-1553B, which could be used for fly-by-light, stores management, AEW etc., on an aircraft has been developed. The data bus is considered intelligent because it can automatically sense which station is in the transmit mode and control the active interface accordingly, so that smooth flow of data takes place on the bus. The tests carried out on the bus including those on the Jaguar Avionics Rig to check its validity are also described. As no software is involved in the operation of the bus, this could be used on any aircraft having its own software.

  4. A simulation approach to MIL-STD-1553 Multiplex Bus interfacing

    NASA Astrophysics Data System (ADS)

    Lawson, R. J.; Murray, J.

    The technique developed for interfacing a 32 bit minicomputer to the MIL-STD-1553 Avionics Multiplex Bus (Mux Bus) in the F/A-18 Part Task Trainer is discussed. It is noted that the capability of access to the Mux Bus through a minicomputer provides the means of emulating any aircraft system the mission computer interfaces to in the aircraft. The capability of emulating the mission computer also exists for simulating real aircraft systems. The technique for recognizing bus requests for systems data required for simulation and responding to these requests within the timing constraints of 1553 is described, and details of bus operation specified by 1553 are given.

  5. Study for a VEGETATION Follow on Mission onto PROBA2 Bus

    NASA Astrophysics Data System (ADS)

    Michaud, J.; Tinto, F.; Biffi, J.-M.; Etcheto, P.; Perraud, L.; Thiebaut, C.; Albouys, V.; Guerin, A.; Passot, X.; Henry, P.; Maisongrande, P.; Foliard, J.; Legal, J.-L.; Martinez-Alcade, S.

    2008-08-01

    Improvements in electronics and optics have been one of the elements that drove CNES studying the possibility to propose a payload answering Vegetation mission data users needs and small enough to be compatible with Proba2 bus. While currently flying VGT1 and VGT2 instruments weigh 150 kg, a mass allocation of 40 kg is offered by Proba2 bus to the payload. Current technologies in electronics, mass memory, communication systems, optics manufacturing have shown that a small satellite can take over VGT1 and VGT2 service providing either recurrent products in a continuity way or even enhanced products with an improved resolution. This paper presents CNES study of this payload. Beyond a simple concept study, this work aimed at proposing a mission or a scenario together with the justification elements that it is the best compromise between users needs, technical possibilities and in the given programmatical constraints. This CNES study has been conducted by the CNES PASO (Plateau des Systeme Orbitaux) structure, using the approach developed to manage every CNES assessment studies and using CIC tool (Concurring Engineering Centre). Driving parameters as optical resolution, swath, orbit, detectors, optics types, number of instruments, compression, communication system and the corresponding options or possibilities have been identified. Based on this first work, scenarios have been built up as dioptric or catadioptric based instruments with different possible resolutions and different number of instruments. Each identified scenario have been evaluated in terms of performances, risks, cost and these payloads have been proposed for a work at satellite level managed by ESTEC to assess its embarkation onto Proba2 bus.

  6. MBus: An Ultra-Low Power Interconnect Bus for Next Generation Nanopower Systems

    PubMed Central

    Pannuto, Pat; Lee, Yoonmyung; Kuo, Ye-Sheng; Foo, ZhiYoong; Kempke, Benjamin; Kim, Gyouho; Dreslinski, Ronald G.; Blaauw, David; Dutta, Prabal

    2015-01-01

    As we show in this paper, I/O has become the limiting factor in scaling down size and power toward the goal of invisible computing. Achieving this goal will require composing optimized and specialized—yet reusable—components with an interconnect that permits tiny, ultra-low power systems. In contrast to today’s interconnects which are limited by power-hungry pull-ups or high-overhead chip-select lines, our approach provides a superset of common bus features but at lower power, with fixed area and pin count, using fully synthesizable logic, and with surprisingly low protocol overhead. We present MBus, a new 4-pin, 22.6 pJ/bit/chip chip-to-chip interconnect made of two “shoot-through” rings. MBus facilitates ultra-low power system operation by implementing automatic power-gating of each chip in the system, easing the integration of active, inactive, and activating circuits on a single die. In addition, we introduce a new bus primitive: power oblivious communication, which guarantees message reception regardless of the recipient’s power state when a message is sent. This disentangles power management from communication, greatly simplifying the creation of viable, modular, and heterogeneous systems that operate on the order of nanowatts. To evaluate the viability, power, performance, overhead, and scalability of our design, we build both hardware and software implementations of MBus and show its seamless operation across two FPGAs and twelve custom chips from three different semiconductor processes. A three-chip, 2.2 mm3 MBus system draws 8 nW of total system standby power and uses only 22.6 pJ/bit/chip for communication. This is the lowest power for any system bus with MBus’s feature set. PMID:26855555

  7. Determination of an Optimal Commercial Data Bus Architecture for a Flight Data System

    NASA Technical Reports Server (NTRS)

    Crawford, Kevin; Johnson, Martin; Humphries, Rick (Technical Monitor)

    2001-01-01

    NASA/Marshall Space Flight Center (MSFC) is continually looking for methods to reduce cost and schedule while keeping the quality of work high. MSFC is NASA's lead center for space transportation and microgravity research. When supporting NASA's programs several decisions concerning the avionics system must be made. Usually many trade studies must be conducted to determine the best ways to meet the customer's requirements. When deciding the flight data system, one of the first trade studies normally conducted is the determination of the data bus architecture. The schedule, cost, reliability, and environments are some of the factors that are reviewed in the determination of the data bus architecture. Based on the studies, the data bus architecture could result in a proprietary data bus or a commercial data bus. The cost factor usually removes the proprietary data bus from consideration. The commercial data bus's range from Versa Module Eurocard (VME) to Compact PCI to STD 32 to PC 104. If cost, schedule and size are prime factors, VME is usually not considered. If the prime factors are cost, schedule, and size then Compact PCI, STD 32 and PC104 are the choices for the data bus architecture. MSFC's center director has funded a study from his discretionary fund to determine an optimal low cost commercial data bus architecture. The goal of the study is to functionally and environmentally test Compact PCI, STD 32 and PC 104 data bus architectures. This paper will summarize the results of the data bus architecture study.

  8. Design of a CAN bus interface for photoelectric encoder in the spaceflight camera

    NASA Astrophysics Data System (ADS)

    Sun, Ying; Wan, Qiu-hua; She, Rong-hong; Zhao, Chang-hai; Jiang, Yong

    2009-05-01

    In order to make photoelectric encoder usable in a spaceflight camera which adopts CAN bus as the communication method, CAN bus interface of the photoelectric encoder is designed in this paper. CAN bus interface hardware circuit of photoelectric encoder consists of CAN bus controller SJA 1000, CAN bus transceiver TJA1050 and singlechip. CAN bus interface controlling software program is completed in C language. A ten-meter shield twisted pair line is used as the transmission medium in the spaceflight camera, and speed rate is 600kbps.The experiments show that: the photoelectric encoder with CAN bus interface which has the advantages of more reliability, real-time, transfer rate and transfer distance overcomes communication line's shortcomings of classical photoelectric encoder system. The system works well in automatic measuring and controlling system.

  9. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart...

  10. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart...

  11. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart...

  12. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart...

  13. School Bus Ridership Orientation and Training. Pupil Transportation Safety Program. Implementation & Reference Guide for D.O.T. Standard 17.

    ERIC Educational Resources Information Center

    Larsen, R. A.

    Designed to assist pupil transportation supervisors, safety instructors, school bus drivers, curriculum writers, teachers, and others who have some type of responsibility for school bus safety, this suggestion-type booklet provides practical tips for educating student school bus riders. The items covered are (1) going to the bus stop; (2) at the…

  14. ECALS: loading studies interim report October 2013

    USGS Publications Warehouse

    Klymus, Katy; Richter, Cathy; Chapman, Duane; Paukert, Craig P.

    2013-01-01

    Here we follow up the loading studies interim report from July 2013 and include results from laboratory studies assessing the effects of diet on eDNA shedding rates by bigheaded carps(silver and bighead carp). In order to understand how eDNA behavesin the environment, we must understand how it enters the system. In our July interim report, we addressed three of our four hypotheses that could influence the shedding rate of eDNA by these fish (Table 1; hypotheses A, B and D). We now provide results from studies that tested the fourth hypothesis (C), cellular debris from the gut-lining shed via excrementis a major source of shed eDNA.

  15. Tribal child welfare. Interim final rule.

    PubMed

    2012-01-01

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program. PMID:22242232

  16. Heat storage for a bus petrol internal-combustion engine

    NASA Astrophysics Data System (ADS)

    Vasiliev, Leonard L.; Burak, Victor S.; Kulakov, Andry G.; Mishkinis, Donatas A.; Bohan, Pavel V.

    The heat storage (HS) system for pre-heating a bus petrol internal combustion engine to starting was mathematically modelled and experimentally investigated. The development of such devices is an extremely urgent problem especially for regions with a cold climate. We discuss how HS works on the effect of absorption and rejection of heat energy at a solid-liquid phase change of a HS substance. In the first part of the paper a numerical method to calculate the HS mass-dimensional parameters and their characteristics are described. In the experimental part of the paper results are given of experiments on the pre-heating device aiding to start a carburettor engine under operational conditions and analysis of data received. Practical confirmation of the theoretical development of HS devices for a bus engine for starting by pre-heating is given.

  17. Weak bus-oriented optimal multi-objective VAR planning

    SciTech Connect

    Chen, Y.L.

    1996-11-01

    This paper presents a weak bus-oriented criterion to determine the candidate buses for installing new VAR sources in the VAR planning problem. First, an efficient method, using a voltage collapse proximity indicator, is described for identifying weak buses. Then appropriate VAR planning in those weak buses can enhance the system security margin, in particular, to prevent voltage collapse. Next, the goal attainment (GA) method based on the Simulated Annealing (SA) approach is applied to solving general multi-objective VAR planning problems by assuming that the decisionmaker (DM) has goals for each of the objective functions. The presented method can both obtain a better final solution and reduce the solution space. Results of application of the proposed method to the AEP-14 bus system as well as to a large, actual-size system are also presented.

  18. Discharging a DC bus capacitor of an electrical converter system

    DOEpatents

    Kajouke, Lateef A; Perisic, Milun; Ransom, Ray M

    2014-10-14

    A system and method of discharging a bus capacitor of a bidirectional matrix converter of a vehicle are presented here. The method begins by electrically shorting the AC interface of the converter after an AC energy source is disconnected from the AC interface. The method continues by arranging a plurality of switching elements of a second energy conversion module into a discharge configuration to establish an electrical current path from a first terminal of an isolation module, through an inductive element, and to a second terminal of the isolation module. The method also modulates a plurality of switching elements of a first energy conversion module, while maintaining the discharge configuration of the second energy conversion module, to at least partially discharge a DC bus capacitor.

  19. Bus Vent Design Evolution for the Solar Dynamics Observatory

    NASA Technical Reports Server (NTRS)

    Woronowicz, Michael

    2010-01-01

    As a spacecraft undergoes ascent in a launch vehicle, its pressure environment transitions from one atmosphere to high vacuum in a matter of minutes. Venting of internal cavities is necessary to prevent the buildup of pressure differentials across cavity walls. Opposing the need to vent these volumes freely into space are thermal, optical, and electrostatic requirements for limiting or prohibiting the intrusion of unwanted energy into the same cavities. Bus vent design evolution is discussed for the Solar Dynamics Observatory. Design changes were influenced by a number of factors and concerns, such as contamination control, electrostatic discharge, changes in bus material, and driving fairing ascent pressure for a launch vehicle that was just entering service as this satellite project had gotten underway.

  20. Pricing and Availability Intervention in Vending Machines at Four Bus Garages

    PubMed Central

    Hannan, Peter J; Harnack, Lisa J; Mitchell, Nathan R; Toomey, Traci L; Gerlach, Anne

    2009-01-01

    Objective To evaluate the effects of lowering prices and increasing availability on sales of healthy foods and beverages from 33 vending machines in four bus garages as part of a multi-component worksite obesity prevention intervention. Methods Availability of healthy items was increased to 50% and prices were lowered at least 10% in the vending machines in two metropolitan bus garages for an 18-month period. Two control garages offered vending choices at usual availability and prices. Sales data were collected monthly from each of the vending machines at the four garages. Results Increases in availability to 50% and price reductions of an average of 31% resulted in 10-42% higher sales of the healthy items. Employees were most price-responsive for snack purchases. Conclusions Greater availability and lower prices on targeted food and beverage items from vending machines was associated with greater purchases of these items over an eighteen-month period. Efforts to promote healthful food purchases in worksite settings should incorporate these two strategies. PMID:20061884