Science.gov

Sample records for bus laboratory testing

  1. SCSI Communication Test Bus

    NASA Technical Reports Server (NTRS)

    Hua, Chanh V.; D'Ambrose, John J.; Jaworski, Richard C.; Halula, Elaine M.; Thornton, David N.; Heligman, Robert L.; Turner, Michael R.

    1990-01-01

    Small Computer System Interface (SCSI) communication test bus provides high-data-rate, standard interconnection enabling communication among International Business Machines (IBM) Personal System/2 Micro Channel, other devices connected to Micro Channel, test equipment, and host computer. Serves primarily as nonintrusive input/output attachment to PS/2 Micro Channel bus, providing rapid communication for debugger. Opens up possibility of using debugger in real-time applications.

  2. King County Metro Transit: Allison Hybrid Electric Transit Bus Laboratory Testing

    SciTech Connect

    Hayes, R. R.; Williams, A.; Ireland, J.; Walkowicz, K.

    2006-09-01

    Paper summarizes chassis dynamometer testing of two 60-foot articulated transit buses, one conventional and one hybrid, at NREL's ReFUEL Laboratory. It includes experimental setup, test procedures, and results from vehicle testing performed at the NREL ReFUEL laboratory.

  3. Testing and Evaluation of Batteries for a Fuel Cell Powered Hybrid Bus

    SciTech Connect

    Miller, J.F.; Webster, C.E.; Tummillo, A.F.; DeLuca, W.H.

    1997-05-01

    Argonne National Laboratory conducted performance characterization and life-cycle tests on various batteries to qualify them for use in a fuel cell/battery hybrid bus. On this bus, methanol-fueled, phosphoric acid fuel cells provide routine power needs, while batteries are used to store energy recovered during bus braking and to produce short-duration power during acceleration. Argonne carried out evaluation and endurance testing on several lead-acid and nickel/cadmium batteries selected by the bus developer as potential candidates for the bus application. Argonne conducted over 10,000 hours of testing, simulating more than 80,000 miles of fuel cell bus operation, for the nickel/cadmium battery, which was ultimately selected for use in the three hybrid buses built under the direction of H-Power Corp.

  4. Audit of bus service subsidies at the Idaho National Engineering Laboratory

    SciTech Connect

    1996-11-07

    In September 1995, the Office of Inspector General (OIG) issued the Audit of Subsidized Ancillary Services at the Nevada Test Site which concluded that the Department continued to pay high subsidies for ancillary services, including bus services, that were not used extensively, may no longer be needed, could be more fully supported by its users, or could be operated more efficiently. Consistent with the audit at Nevada, the purpose of this audit was to assess whether bus service subsidies at the Laboratory were still necessary or reasonable. Specifically, the audit determined if the current level of bus services was still needed, if operating costs could be reduced, and if users should bear a greater share of bus operations costs.

  5. Laboratory Tests

    MedlinePlus

    Laboratory tests check a sample of your blood, urine, or body tissues. A technician or your doctor ... compare your results to results from previous tests. Laboratory tests are often part of a routine checkup ...

  6. Laboratory Tests

    MedlinePlus

    ... Home Medical Devices Products and Medical Procedures In Vitro Diagnostics Lab Tests Laboratory Tests Share Tweet Linkedin ... Approved Home and Lab Tests Find All In Vitro Diagnostic Products and Decision Summaries Since November 2003 ...

  7. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Tests To Be Performed at the Bus Testing Facility A Appendix A to Part 665 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Pt. 665, App. A Appendix A to Part 665—Tests To Be Performed at the Bus...

  8. Testing of Environmental Satellite Bus-Instrument Interfaces Using Engineering Models

    NASA Technical Reports Server (NTRS)

    Gagnier, Donald; Hayner, Rick; Nosek, Thomas; Roza, Michael; Hendershot, James E.; Razzaghi, Andrea I.

    2004-01-01

    This paper discusses the formulation and execution of a laboratory test of the electrical interfaces between multiple atmospheric scientific instruments and the spacecraft bus that carries them. The testing, performed in 2002, used engineering models of the instruments and the Aura spacecraft bus electronics. Aura is one of NASA s Earth Observatory System missions. The test was designed to evaluate the complex interfaces in the command and data handling subsystems prior to integration of the complete flight instruments on the spacecraft. A problem discovered during the flight integration phase of the observatory can cause significant cost and schedule impacts. The tests successfully revealed problems and led to their resolution before the full-up integration phase, saving significant cost and schedule. This approach could be beneficial for future environmental satellite programs involving the integration of multiple, complex scientific instruments onto a spacecraft bus.

  9. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for several miles and then inspected for structural damage or permanent deformation. (5) With the bus... both up and down a steep grade. 5. Structural Integrity Two complementary structural integrity tests should be performed. Structural strength and distortion tests should be performed at the Bus...

  10. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for several miles and then inspected for structural damage or permanent deformation. (5) With the bus... both up and down a steep grade. 5. Structural Integrity Two complementary structural integrity tests should be performed. Structural strength and distortion tests should be performed at the Bus...

  11. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for several miles and then inspected for structural damage or permanent deformation. (5) With the bus... both up and down a steep grade. 5. Structural Integrity Two complementary structural integrity tests should be performed. Structural strength and distortion tests should be performed at the Bus...

  12. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for several miles and then inspected for structural damage or permanent deformation. (5) With the bus... both up and down a steep grade. 5. Structural Integrity Two complementary structural integrity tests should be performed. Structural strength and distortion tests should be performed at the Bus...

  13. Real life testing of a Hybrid PEM Fuel Cell Bus

    NASA Astrophysics Data System (ADS)

    Folkesson, Anders; Andersson, Christian; Alvfors, Per; Alaküla, Mats; Overgaard, Lars

    Fuel cells produce low quantities of local emissions, if any, and are therefore one of the most promising alternatives to internal combustion engines as the main power source in future vehicles. It is likely that urban buses will be among the first commercial applications for fuel cells in vehicles. This is due to the fact that urban buses are highly visible for the public, they contribute significantly to air pollution in urban areas, they have small limitations in weight and volume and fuelling is handled via a centralised infrastructure. Results and experiences from real life measurements of energy flows in a Scania Hybrid PEM Fuel Cell Concept Bus are presented in this paper. The tests consist of measurements during several standard duty cycles. The efficiency of the fuel cell system and of the complete vehicle are presented and discussed. The net efficiency of the fuel cell system was approximately 40% and the fuel consumption of the concept bus is between 42 and 48% lower compared to a standard Scania bus. Energy recovery by regenerative braking saves up 28% energy. Bus subsystems such as the pneumatic system for door opening, suspension and brakes, the hydraulic power steering, the 24 V grid, the water pump and the cooling fans consume approximately 7% of the energy in the fuel input or 17% of the net power output from the fuel cell system. The bus was built by a number of companies in a project partly financed by the European Commission's Joule programme. The comprehensive testing is partly financed by the Swedish programme "Den Gröna Bilen" (The Green Car). A 50 kW el fuel cell system is the power source and a high voltage battery pack works as an energy buffer and power booster. The fuel, compressed hydrogen, is stored in two high-pressure stainless steel vessels mounted on the roof of the bus. The bus has a series hybrid electric driveline with wheel hub motors with a maximum power of 100 kW. Hybrid Fuel Cell Buses have a big potential, but there are

  14. Testing of Environmental Satellite Bus-Instrument Interfaces Using Engineering Models

    NASA Technical Reports Server (NTRS)

    Gagnier, Don; Hayner, Rick; Roza, Michael; Nosek, Thomas; Razzaghi, Andrea

    2004-01-01

    This paper discusses the formulation and execution of a laboratory test of the electrical interfaces between multiple atmospheric science instruments and the spacecraft bus that carries them. The testing, performed in 2002, used engineering models of the instruments that will be flown on the Aura s p a c m and of the Aura spacecraft bus electronics. Aura is one of NASA's Earth Observing System @OS) Program missions managed by the Goddard Space Flight Center. The test was designed to evaluate the complex interfaces in the spacecraft and instrument command and data handling (C&DH) subsystems prior to integration of the complete flight instruments on the spacecraft. A problem discovered during (and not before) the flight hardware integration phase can cause significant cost and schedule impacts. The testing successfully surfaced problems and led to their resolution before the full-up integration phase, saving significant cost and schedule time. This approach could be used on future environmental satellite programs involving multiple, complex scientific instruments being integrated onto a bus.

  15. Baseline Testing of the Hybrid Electric Transit Bus

    NASA Technical Reports Server (NTRS)

    Brown, Jeffrey C.; Eichenberg, Dennis J.; Thompson, William K.

    1999-01-01

    A government, industry and academic cooperative has developed a Hybrid Electric Transit Bus (HETB). Goals of the program include doubling the fuel economy of city transit buses currently in service, and reducing emissions to one-tenth of EPA standards. Unique aspects of the vehicle's power system include the use of ultra-capacitors for the energy storage system and the planned use of a natural gas fueled turbogenerator, to be developed from a small jet engine. At over 17000 kg gross weight, this is the largest vehicle to use ultra-capacitor energy storage. A description of the HETB, the results of performance testing, and future vehicle development plans are the subject of this report.

  16. Operationally Responsive Space Standard Bus Battery Thermal Balance Testing and Heat Dissipation Analysis

    NASA Technical Reports Server (NTRS)

    Marley, Mike

    2008-01-01

    The focus of this paper will be on the thermal balance testing for the Operationally Responsive Space Standard Bus Battery. The Standard Bus thermal design required that the battery be isolated from the bus itself. This required the battery to have its own thermal control, including heaters and a radiator surface. Since the battery was not ready for testing during the overall bus thermal balance testing, a separate test was conducted to verify the thermal design for the battery. This paper will discuss in detail, the test set up, test procedure, and results from this test. Additionally this paper will consider the methods taken to determine the heat dissipation of the battery during charge and discharge. It seems that the heat dissipation for Lithium Ion batteries is relatively unknown and hard to quantify. The methods used during test and the post test analysis to estimate the heat dissipation of the battery will be discussed.

  17. 76 FR 13580 - Bus Testing; Calculation of Average Passenger Weight and Test Vehicle Weight

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ... Federal Register (74 FR 51083) that incorporated brake performance and emissions tests into FTA's bus... Weight Per Person (See, ``Passenger Weight and Inspected Vessel Stability Requirements: Final Rule, 75 FR... Transportation (44 FR 11032). Executive Order 12866 requires agencies to regulate in the ``most...

  18. 76 FR 28947 - Bus Testing: Calculation of Average Passenger Weight and Test Vehicle Weight, and Public Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ..., 2011 (76 FR 13580). Furthermore, due to the complexity of the issues proposed in the NPRM, FTA is..., FTA published an NPRM in the Federal Register (76 FR 13850) proposing to amend its bus testing... Federal Transit Administration 49 CFR Part 665 RIN 2132-AB01 Bus Testing: Calculation of Average...

  19. Test of copper-braid-stabilized bus lines for superconducting dipole magnets

    SciTech Connect

    Doi, M.; Kabe, A.; Kojima, Y.

    1996-12-31

    A high cryogenic stability suprconducting bus-line has been developed to connect a superconducting dipole magnet with a full length of 13 m to a current lead approximately 2 meters from the magnet. The superconducting bus-line is made of NbTi strand cables for magnet use soldered to copper braid. The copper braid has a large surface area to improve cooling efficiency and increase cryogenic stability. Three kinds of bus-line are prepared on experimental basis: a bare superconducting cable, a superconducting cable joined copper braid with a thin layer of solder, and one made by filling the inside of copper braid with solder. Cryogenic stability tests confirmed that a bus-line equipped with a copper braid provides twice the cryogenic stability as a bare superconducting cable.

  20. Understanding Laboratory Tests

    MedlinePlus

    ... and Drug Administration (FDA) regulates the development and marketing of all laboratory tests that use test kits ... at the National Institutes of Health FOLLOW US Facebook Twitter Instagram YouTube Google+ LinkedIn GovDelivery RSS CONTACT ...

  1. A Pilot Test To Improve School Bus Routes and Time Schedules. A Report.

    ERIC Educational Resources Information Center

    Ronchetti, Thomas R.; And Others

    This publication contains an encapsulated report on a 1973 pilot project on computer aided bus routing and scheduling involving 22 diversified school districts of New Jersey. Called Transportation Information Planning Service (TRIPS), the project sought to develop and subject to initial test a man-machine system that would offer optimum latitude…

  2. SEDS MIL-STD-1773 fiber optic data bus: Proton irradiation test results and spaceflight SEU data

    SciTech Connect

    LaBel, K.A.; Stassinopoulos, E.G.; Miller, J.T. ); Marshall, P. ); Dale, C. ); Crabtree, C.M. ); Gates, M.M. )

    1993-12-01

    The Small Explorer Data System (SEDS) was launched in July of 1992 as part of the Solar Anomalous Magnetospheric Particle Explorer (SAMPEX) mission. The SEDS utilizes NASA's first MIL-STD-1773 Fiber Optic Multiplexed Data Bus (or 1773 bus) to communicate with other spacecraft subsystems in the space environment. The 1773 bus is the fiber optic version of the MIL-STD-1553 Data Bus, a electronic wire bus used in many avionics applications. The authors present proton test and space flight single event effect data for NASA's first fiber optic data bus. Bit error rate predictions based on a new proton direct ionization model agree well with flight data for proton belt and solar flare effects.

  3. Preoperative Laboratory Testing.

    PubMed

    Bock, Matthias; Fritsch, Gerhard; Hepner, David L

    2016-03-01

    Routine preoperative testing is not cost-effective, because it is unlikely to identify significant abnormalities. Abnormal findings from routine testing are more likely to be false positive, are costly to pursue, introduce a new risk, increase the patient's anxiety, and are inconvenient to the patient. Abnormal findings rarely alter the surgical or anesthetic plan, and there is usually no association between perioperative complications and abnormal laboratory results. Incidental findings and false positive results may lead to increased hospital visits and admissions. Preoperative testing needs to be done based on a targeted history and physical examination and the type of surgery. PMID:26927738

  4. Testing of a refuelable zinc/air bus battery

    SciTech Connect

    Cooper, J.F.; Fleming, D.; Koopman, R.; Hargrove, D.; Maimoni, A.; Peterman, K.

    1995-02-22

    We report tests of a refuelable zinc/air battery of modular, bipolar-cell design, intended for fleet electric busses and vans. The stack consists of twelve 250-cm{sup 2} cells built of two units: (1) a copper-clad glass-reinforced epoxy board supporting anode and cathode current collectors, and (2) polymer frame providing for air- and electrolyte distribution and zinc fuel storage. The stack was refueled in 4 min. by a hydraulic transfer of zinc particles entrained in solution flow.

  5. Preliminary Flight Results of the Microelectronics and Photonics Test Bed: NASA DR1773 Fiber Optic Data Bus Experiment

    NASA Technical Reports Server (NTRS)

    Jackson, George L.; LaBel, Kenneth A.; Marshall, Cheryl; Barth, Janet; Seidleck, Christina; Marshall, Paul

    1998-01-01

    NASA Goddard Spare Flight Center's (GSFC) Dual Rate 1773 (DR1773) Experiment on the Microelectronic and Photonic Test Bed (MPTB) has provided valuable information on the performance of the AS 1773 fiber optic data bus in the space radiation environment. Correlation of preliminary experiment data to ground based radiation test results show the AS 1773 bus is employable in future spacecraft applications requiring radiation tolerant communication links.

  6. Computer integrated laboratory testing

    NASA Technical Reports Server (NTRS)

    Dahl, Charles C.

    1992-01-01

    The objective is the integration of computers into the Engineering Materials Science Laboratory course, where existing test equipment is not computerized. The first lab procedure is to demonstrate and produce a material phase change curve. The second procedure is a demonstration of the modulus of elasticity and related stress-strain curve, plastic performance, maximum and failure strength. The process of recording data by sensors that are connected to a data logger which adds a time base, and the data logger in turn connected to a computer, places the materials labs into a computer integrated mode with minimum expense and maximum flexibility. The sensor signals are input into a spread sheet for tabular records, curve generation, and graph printing.

  7. Deployment of Directory Service for IEEE N Bus Test System Information

    NASA Astrophysics Data System (ADS)

    Barman, Amal; Sil, Jaya

    2008-10-01

    Exchanging information over Internet and Intranet becomes a defacto standard in computer applications, among various users and organizations. Distributed system study, e-governance etc require transparent information exchange between applications, constituencies, manufacturers, and vendors. To serve these purposes database system is needed for storing system data and other relevant information. Directory service, which is a specialized database along with access protocol, could be the single solution since it runs over TCP/IP, supported by all POSIX compliance platforms and is based on open standard. This paper describes a way to deploy directory service, to store IEEE n bus test system data and integrating load flow program with it.

  8. How Reliable Is Laboratory Testing?

    MedlinePlus

    ... to day in a laboratory. The other two, sensitivity and specificity, deal with how well the test ... are frequently monitored by the professional laboratory personnel. Sensitivity and specificity data are determined by research studies ...

  9. Bus mathematical model of acceleration threshold limit estimation in lateral rollover test

    NASA Astrophysics Data System (ADS)

    Gauchía, A.; Olmeda, E.; Aparicio, F.; Díaz, V.

    2011-10-01

    Vehicle safety is a major concerns for researchers, governments and vehicle manufacturers, and therefore a special attention is paid to it. Particularly, rollover is one of the types of accidents where researchers have focused due to the gravity of injuries and the social impact it generates. One of the parameters that define bus lateral behaviour is the acceleration threshold limit, which is defined as the lateral acceleration from which the rollover process begins to take place. This parameter can be obtained by means of a lateral rollover platform test or estimated by means of mathematical models. In this paper, the differences between these methods are deeply analysed, and a new mathematical model is proposed to estimate the acceleration threshold limit in the lateral rollover test. The proposed model simulates the lateral rollover test, and, for the first time, it includes the effect of a variable position of the centre of gravity. Finally, the maximum speed at which the bus can travel in a bend without rolling over is computed.

  10. Personal Computer Monitors Instrumentation Bus

    NASA Technical Reports Server (NTRS)

    Conroy, Bruce L.

    1994-01-01

    IBM-compatible personal computer used instead of logic analyzer or other special instrument to monitor IEEE-488 interface data bus that interconnects various pieces of laboratory equipment. Needed is short program for computer, commercial general-purpose interface bus circuit card, and adapter cable to link card to bus. Software available in Ada or Quick Basic language.

  11. Diesel and CNG Transit Bus Emissions Characterization By Two Chassis Dynamometer Laboratories: Results and Issues

    SciTech Connect

    Nigel N. Clark, Mridul Gautam; Byron L. Rapp; Donald W. Lyons; Michael S. Graboski; Robert L. McCormick; Teresa L. Alleman; Paul Norton

    1999-05-03

    Emissions of six 32 passenger transit buses were characterized using one of the West Virginia University (WVU) Transportable Heavy Duty Emissions Testing Laboratories, and the fixed base chassis dynamometer at the Colorado Institute for Fuels and High Altitude Engine Research (CIFHAER). Three of the buses were powered with 1997 ISB 5.9 liter Cummins diesel engines, and three were powered with the 1997 5.9 liter Cummins natural gas (NG) counterpart. The NG engines were LEV certified. Objectives were to contrast the emissions performance of the diesel and NG units, and to compare results from the two laboratories. Both laboratories found that oxides of nitrogen and particulate matter (PM) emissions were substantially lower for the natural gas buses than for the diesel buses. It was observed that by varying the rapidity of pedal movement during accelerations in the Central Business District cycle (CBD), CO and PM emissions from the diesel buses could be varied by a factor of three or more. The driving styles may be characterized as aggressive and non-aggressive, but both styles followed the CBD speed command acceptably. PM emissions were far higher for the aggressive driving style. For the NG fueled vehicles driving style had a similar, although smaller, effect on NO{sub x}. It is evident that driver habits may cause substantial deviation in emissions for the CBD cycle. When the CO emissions are used as a surrogate for driver aggression, a regression analysis shows that NO{sub x} and PM emissions from the two laboratories agree closely for equivalent driving style. Implications of driver habit for emissions inventories and regulations are briefly considered.

  12. Misleading biochemical laboratory test results

    PubMed Central

    Nanji, Amin A.

    1984-01-01

    This article reviews the general and specific factors that interfere with the performance of common biochemical laboratory tests and the interpretation of their results. The clinical status of the patient, drug interactions, and in-vivo and in-vitro biochemical interactions and changes may alter the results obtained from biochemical analysis of blood constituents. Failure to recognize invalid laboratory test results may lead to injudicious and dangerous management of patients. PMID:6375845

  13. Electromedical devices test laboratories accreditation

    NASA Astrophysics Data System (ADS)

    Murad, C.; Rubio, D.; Ponce, S.; Álvarez Abri, A.; Terrón, A.; Vicencio, D.; Fascioli, E.

    2007-11-01

    In the last years, the technology and equipment at hospitals have been increase in a great way as the risks of their implementation. Safety in medical equipment must be considered an important issue to protect patients and their users. For this reason, test and calibrations laboratories must verify the correct performance of this kind of devices under national and international standards. Is an essential mission for laboratories to develop their measurement activities taking into account a quality management system. In this article, we intend to transmit our experience working to achieve an accredited Test Laboratories for medical devices in National technological University.

  14. 3. VIEW LOOKING NORTH, COMPONENTS TEST LABORATORY, DYNAMIC TEST FACILITY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW LOOKING NORTH, COMPONENTS TEST LABORATORY, DYNAMIC TEST FACILITY (SATURN V IN BACKGROUND). - Marshall Space Flight Center, East Test Area, Components Test Laboratory, Huntsville, Madison County, AL

  15. Active SWIR laboratory testing methodology

    NASA Astrophysics Data System (ADS)

    Webb, Curtis M.; White, Steve; Rich, Brian

    2013-06-01

    Active Short Wave InfraRed (SWIR) imaging presents unique challenges to laboratory testing. It is always important to have laboratory testing that will directly relate to field performance. This paper will present the modeling and corresponding laboratory testing that was developed for these types of systems. The paper will present the modeling that was used to derive the lab metric used for verification testing of the system and provide details into the design of the lab equipment that was necessary to ensure accurate lab testing. The Noise Limited Resolution (NLR) test, first developed for low light imaging systems in the 1960s, serves as the basic lab metric for the evaluation of the active SWIR system. This test serves well for a quick test (go-no go) and is used to evaluate this system during production testing. The test derivation will be described and shown how it relates to the modeling results. The test equipment developed by Santa Barbara InfraRed (SBIR) for this application allows for accurate uniform radiance levels from an integrating sphere for both 1.06um and 1.57um imaging applications. The source has the ability to directly mimic any laser system and can provide pulsed laser source radiation from 20 nanoseconds to 500 nanoseconds resulting in levels from 0.4 to 85 nJ/cm2/sr, peak radiance levels. The light source can be triggered to replicate a laser return at any range from 100m to 100,000m. Additionally, the source provides the ability to output Mid Wave IR (MWIR) illumination through the use of a small extended area IR source in the integrating sphere. This is useful for boresighting the active SWIR sensor with other sensors such as Forward Looking IR (FLIR).

  16. Laboratory testing for antiphospholipid syndrome.

    PubMed

    Pengo, V; Banzato, A; Bison, E; Denas, G; Zoppellaro, G; Bracco, A; Padayattil Jose, S; Hoxha, A; Ruffatti, A

    2016-05-01

    This is a practical report on laboratory tests for the diagnosis of antiphospholipid syndrome (APS). After a general definition of APS, this study deals with appropriateness and timing in requesting the determination of antiphospholipid (aPL) antibodies. Lupus anticoagulant (LAC), anticardiolipin (aCL), and anti β2-glycoprotein I (aβGPI) are the mandatory tests to be performed, while other tests are not yet validated for clinical use. Interpretation of results is an important discussed issue that implies a close liaison between clinical pathologists and clinicians. Finally, a personal definition of APS according to aPL antibody profile closes the manuscript. PMID:27161602

  17. Feasibility study of an orbiting laboratory for testing CSI technology

    NASA Technical Reports Server (NTRS)

    Bicos, Andrew S.; Loboda, Gregory G.

    1993-01-01

    A concept for an orbiting laboratory for testing Controls-Structures Integration (CSI) technology is described. The CSI-Star concept reflects a lower cost, higher risk approach. The concept supports demonstration and validation testing for critical CSI technologies at a cost of $20M to $26M with a 1-year reliability of approximately 0.9. The Ball Aerospace QuickStar bus is the carrier for the CSI test article. QuickStar is launched as a secondary payload on the McDonnell Douglas Delta 2. The QuickStar/Delta 2 approach is flight proven. The CSI test article is a 20 foot, 1 Hz, truss beam which is deployed from the QuickStar bus. The test article is well instrumented for quality system identification. The laboratory provides three layers of active control consisting of global vibration suppression along the truss beam, vibration isolation between the beam and instrument platforms, and vibration compensation through the use of gimbaled platforms which point lasers relative to optical sensor targets. The configuration simulates the dynamics of multi-instrument science platforms such as those of the Earth Observation System (EOS) while maintaining strong ties to astrophysics missions such as the Optical Interferometer. Uplink/downlink services and a reprogrammable computer provide flexibility for long-term investigations by members of the CSI community (NASA, DoD, academia, and industry). CSI-Star fills the gap between short-term experiments, which have been conducted primarily on the Shuttle, and future science missions which require the technology. The on-orbit maturity of CSI technology must be established to obtain acceptance by project managers and to promote injection of the technology into future science missions.

  18. 77 FR 74452 - Bus Testing: Calculation of Average Passenger Weight and Test Vehicle Weight

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... (GVWR) (74 FR 51083, October 5, 2009). The testing procedure simulated a 150 lb. weight for each seated... square feet (76 FR 13850, March 14, 2011). Subsequent to the NPRM, on July 6, 2012, Congress passed the..., Executive Order 13563, the Regulatory Flexibility Act, or the DOT Regulatory Policies and Procedures (44...

  19. Product and market study for Los Alamos National Laboratory. Building resources for technology commercialization: The SciBus Analytical, Inc. paradigm

    SciTech Connect

    1996-02-01

    The study project was undertaken to investigate how entrepreneurial small businesses with technology licenses can develop product and market strategies sufficiently persuasive to attract resources and exploit commercialization opportunities. The study attempts to answer two primary questions: (1) What key business development strategies are likely to make technology transfers successful, and (2) How should the plan best be presented in order to attract resources (e.g., personnel, funding, channels of distribution)? In the opinion of the investigator, Calidex Corporation, if the business strategies later prove to be successful, then the plan model has relevance for any technology licensee attempting to accumulate resources and bridge from technology resident in government laboratories to the commercial marketplace. The study utilized SciBus Analytical, Inc. (SciBus), a Los Alamos National Laboratory CRADA participant, as the paradigm small business technology licensee. The investigator concluded that the optimum value of the study lay in the preparation of an actual business development plan for SciBus that might then have, hopefully, broader relevance and merit for other private sector technology transfer licensees working with various Government agencies.

  20. Laboratory testing of LITCO glasses

    SciTech Connect

    Ellison, A.; Wolf, S.; Buck, E.; Luo, J.S.; Dietz, N.; Bates, J.K.; Ebert, W.L.

    1995-06-01

    The purpose of this program is to measure, the intermediate and long-term durability of glasses developed by Lockheed Idaho Technology Co. (LITCO) for the immobilization of calcined radioactive wastes. The objective is to use accelerated corrosion tests as an aid in developing durable waste form compositions. This is a report of tests performed on two LITCO glass compositions, Formula 127 and Formula 532. The main avenue for release of radionuclides into the environment in a geologic repository is the reaction of a waste glass with ground water, which alters the glass and releases its components into solution. These stages in glass corrosion are analyzed by using accelerated laboratory tests in which the ratio of sample surface area to solution volume, SA/V, is varied. At low SA/V, the solution concentrations of glass corrosion products remain low and the reaction approaches the forward rate. At higher SA/V the solution approaches saturation levels for glass corrosion products. At very high SA/V the solution is rapidly saturated in glass corrosion products and secondary crystalline phases precipitate. Tests at very high SA/V provide information about the composition of the solution at saturation or, when no solution is recovered, the identities and the order of appearance of secondary crystalline phases. Tests were applied to Formula 127 and Formula 532 glasses to provide information about the interim and long-term stages in glass corrosion.

  1. Educational ultrasound nondestructive testing laboratory.

    PubMed

    Genis, Vladimir; Zagorski, Michael

    2008-09-01

    The ultrasound nondestructive evaluation (NDE) of materials course was developed for applied engineering technology students at Drexel University's Goodwin College of Professional Studies. This three-credit, hands-on laboratory course consists of two parts: the first part with an emphasis on the foundations of NDE, and the second part during which ultrasound NDE techniques are utilized in the evaluation of parts and materials. NDE applications are presented and applied through real-life problems, including calibration and use of the latest ultrasonic testing instrumentation. The students learn engineering and physical principles of measurements of sound velocity in different materials, attenuation coefficients, material thickness, and location and dimensions of discontinuities in various materials, such as holes, cracks, and flaws. The work in the laboratory enhances the fundamentals taught during classroom sessions. This course will ultimately result in improvements in the educational process ["The greater expectations," national panel report, http://www.greaterexpectations.org (last viewed February, 2008); R. M. Felder and R. Brent "The intellectual development of Science and Engineering Students. Part 2: Teaching to promote growth," J. Eng. Educ. 93, 279-291 (2004)] since industry is becoming increasingly reliant on the effective application of NDE technology and the demand on NDE specialists is increasing. NDE curriculum was designed to fulfill levels I and II NDE in theory and training requirements, according to American Society for Nondestructive Testing, OH, Recommended Practice No. SNT-TC-1A (2006). PMID:19045633

  2. CERTS Microgrid Laboratory Test Bed

    SciTech Connect

    Lasseter, R. H.; Eto, J. H.; Schenkman, B.; Stevens, J.; Volkmmer, H.; Klapp, D.; Linton, E.; Hurtado, H.; Roy, J.

    2010-06-08

    CERTS Microgrid concept captures the emerging potential of distributed generation using a system approach. CERTS views generation and associated loads as a subsystem or a 'microgrid'. The sources can operate in parallel to the grid or can operate in island, providing UPS services. The system can disconnect from the utility during large events (i.e. faults, voltage collapses), but may also intentionally disconnect when the quality of power from the grid falls below certain standards. CERTS Microgrid concepts were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resynchronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults.

  3. CERTS Microgrid Laboratory Test Bed

    SciTech Connect

    Eto, Joe; Lasseter, Robert; Schenkman, Ben; Stevens, John; Klapp, Dave; Volkommer, Harry; Linton, Ed; Hurtado, Hector; Roy, Jean

    2009-06-18

    The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2) an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources. These techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations,and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults. The results from these tests are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations

  4. Superconducting link bus design for the accelerator project for upgrade of LHC

    SciTech Connect

    Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.; /Fermilab

    2011-06-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

  5. Superconducting link bus design for the accelerator project for upgrade of LHC

    SciTech Connect

    Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.; /Fermilab

    2010-08-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

  6. Forecast analysis of optical waveguide bus performance

    NASA Technical Reports Server (NTRS)

    Ledesma, R.; Rourke, M. D.

    1979-01-01

    Elements to be considered in the design of a data bus include: architecture; data rate; modulation, encoding, detection; power distribution requirements; protocol, work structure; bus reliability, maintainability; interterminal transmission medium; cost; and others specific to application. Fiber- optic data bus considerations for a 32 port transmissive star architecture, are discussed in a tutorial format. General optical-waveguide bus concepts, are reviewed. The electrical and optical performance of a 32 port transmissive star bus, and the effects of temperature on the performance of optical-waveguide buses are examined. A bibliography of pertinent references and the bus receiver test results are included.

  7. Drive Cycle Analysis, Measurement of Emissions and Fuel Consumption of a PHEV School Bus: Preprint

    SciTech Connect

    Barnitt, R.; Gonder, J.

    2011-04-01

    The National Renewable Energy Laboratory (NREL) collected and analyzed real-world school bus drive cycle data and selected similar standard drive cycles for testing on a chassis dynamometer. NREL tested a first-generation plug-in hybrid electric vehicle (PHEV) school bus equipped with a 6.4L engine and an Enova PHEV drive system comprising a 25-kW/80 kW (continuous/peak) motor and a 370-volt lithium ion battery pack. A Bluebird 7.2L conventional school bus was also tested. Both vehicles were tested over three different drive cycles to capture a range of driving activity. PHEV fuel savings in charge-depleting (CD) mode ranged from slightly more than 30% to a little over 50%. However, the larger fuel savings lasted over a shorter driving distance, as the fully charged PHEV school bus would initially operate in CD mode for some distance, then in a transitional mode, and finally in a charge-sustaining (CS) mode for continued driving. The test results indicate that a PHEV school bus can achieve significant fuel savings during CD operation relative to a conventional bus. In CS mode, the tested bus showed small fuel savings and somewhat higher nitrogen oxide (NOx) emissions than the baseline comparison bus.

  8. Testing the effects of safety climate and disruptive children behavior on school bus drivers performance: A multilevel model.

    PubMed

    Zohar, Dov; Lee, Jin

    2016-10-01

    The study was designed to test a multilevel path model whose variables exert opposing effects on school bus drivers' performance. Whereas departmental safety climate was expected to improve driving safety, the opposite was true for in-vehicle disruptive children behavior. The driving safety path in this model consists of increasing risk-taking practices starting with safety shortcuts leading to rule violations and to near-miss events. The study used a sample of 474 school bus drivers in rural areas, driving children to school and school-related activities. Newly developed scales for measuring predictor, mediator and outcome variables were validated with video data taken from inner and outer cameras, which were installed in 29 buses. Results partially supported the model by indicating that group-level safety climate and individual-level children distraction exerted opposite effects on the driving safety path. Furthermore, as hypothesized, children disruption moderated the strength of the safety rule violation-near miss relationship, resulting in greater strength under high disruptiveness. At the same time, the hypothesized interaction between the two predictor variables was not supported. Theoretical and practical implications for studying safety climate in general and distracted driving in particular for professional drivers are discussed. PMID:27423431

  9. Testing containment of laboratory hoods

    SciTech Connect

    Knutson, G.W.

    1987-06-01

    Laboratory fume hoods often do not adequately provide protection to a chemist or technician at the hood. The reason for failure of the hoods to perform adequately are varied and, in many instances, difficult to determine. In some cases, the laboratory hood manufacturer has provided equipment that does not reflect the state of art in controlling laboratory exposures. In other cases, the architect or engineer has disregarded the function of the hood thus the design of the installation is faulty and the hood will not work. The contractor may have installed the system so poorly that it will not adequately function. Finally, the chemist or technician may misuse the hood, causing poor performance. This paper considers a method of evaluating the performance of laboratory fume hoods. Using the method, the paper examines several instances where the laboratory fume hood performed inadequately, quantifies the performance and identifies the cause of poor performance.

  10. Postirradiation Testing Laboratory (327 Building)

    SciTech Connect

    Kammenzind, D.E.

    1997-05-28

    A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site`s or facility`s mission or configuration, a change in the facility`s life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompass health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct

  11. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethylether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operation in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work

  12. Whole-body Vibration Exposure Intervention among Professional Bus and Truck Drivers: A Laboratory Evaluation of Seat-suspension Designs.

    PubMed

    Blood, Ryan P; Yost, Michael G; Camp, Janice E; Ching, Randal P

    2015-01-01

    Long-term exposure to seated whole-body vibration (WBV) is one of the leading risk factors for the development of low back disorders. Professional bus and truck drivers are regularly exposed to continuous WBV, since they spend the majority of their working hours driving heavy vehicles. This study measured WBV exposures among professional bus and truck drivers and evaluated the effects of seat-suspension designs using simulated field-collected data on a vibration table. WBV exposures were measured and compared across three different seat designs: an air-ride bus seat, an air-ride truck seat, and an electromagnetically active (EM-active) seat. Air-ride seats use a compressed-air bladder to attenuate vibrations, and they have been in operation throughout the transportation industry for many years. The EM-active seat is a relatively new design that incorporates a microprocessor-controlled actuator to dampen vibration. The vibration table simulated seven WBV exposure scenarios: four segments of vertical vibration and three scenarios that used field-collected driving data on different road surfaces-a city street, a freeway, and a section of rough roadway. The field scenarios used tri-axial WBV data that had been collected at the seat pan and at the driver's sternum, in accordance with ISO 2631-1 and 2631-5. This study found that WBV was significantly greater in the vertical direction (z-axis) than in the lateral directions (x-and y-axes) for each of the three road types and each of the three types of seats. Quantitative comparisons of the results showed that the floor-to-seat-pan transmissibility was significantly lower for the EM-active seat than for either the air-ride bus seat or the air-ride truck seat, across all three road types. This study also demonstrated that seat-suspension designs have a significant effect on the vibrations transmitted to vehicle operators, and the study's results may prove useful in designing future seat suspensions. PMID:25625530

  13. Relay testing at Brookhaven National Laboratory

    SciTech Connect

    Bandyopadhyay, K.; Hofmayer, C.

    1989-01-01

    Brookhaven National Laboratory (BNL) is conducting a seismic test program on relays. The purpose of the test program is to investigate the influence of various designs, electrical and vibration parameters on the seismic capacity levels. The first series of testing has been completed and performed at Wyle Laboratories. The major part of the test program consisted of single axis, single frequency sine dwell tests. Random multiaxis, multifrequency tests were also performed. Highlights of the test results as well as a description of the testing methods are presented in this paper. 10 figs.

  14. 21 CFR 640.67 - Laboratory tests.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ADDITIONAL STANDARDS FOR HUMAN BLOOD AND BLOOD PRODUCTS Source Plasma § 640.67 Laboratory tests. Each unit of Source Plasma shall be tested for evidence of infection due to communicable disease agents as...

  15. 21 CFR 640.67 - Laboratory tests.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ADDITIONAL STANDARDS FOR HUMAN BLOOD AND BLOOD PRODUCTS Source Plasma § 640.67 Laboratory tests. Each unit of Source Plasma shall be tested for evidence of infection due to communicable disease agents as...

  16. 21 CFR 640.67 - Laboratory tests.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ADDITIONAL STANDARDS FOR HUMAN BLOOD AND BLOOD PRODUCTS Source Plasma § 640.67 Laboratory tests. Each unit of Source Plasma shall be tested for evidence of infection due to communicable disease agents as...

  17. 21 CFR 640.67 - Laboratory tests.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ADDITIONAL STANDARDS FOR HUMAN BLOOD AND BLOOD PRODUCTS Source Plasma § 640.67 Laboratory tests. Each unit of Source Plasma shall be tested for evidence of infection due to communicable disease agents as...

  18. Putting New Laboratory Tests Into Practice

    MedlinePlus

    ... limited. Home Visit Global Sites Search Help? Putting New Laboratory Tests into Practice Share this page: Was this page helpful? Introduction | Why develop new tests | Regulation | Gaining acceptance | Conclusion | Article Sources Overview ...

  19. 21 CFR 640.67 - Laboratory tests.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ADDITIONAL STANDARDS FOR HUMAN BLOOD AND BLOOD PRODUCTS Source Plasma § 640.67 Laboratory tests. Each unit of Source Plasma shall be tested for evidence of infection due to communicable disease agents as...

  20. Laboratory Performance Testing of Residential Dehumidifiers (Presentation)

    SciTech Connect

    Winkler, J.

    2012-03-01

    Six residential vapor compression cycle dehumidifiers spanning the available range of capacities and efficiencies were tested in the National Renewable Energy Laboratory's Heating, Ventilating, and Air-Conditioning Systems Laboratory. Each was tested under a wide range of indoor air conditions to facilitate the development of performance curves for use in whole-building simulation tools.

  1. World of Forensic Laboratory Testing

    MedlinePlus

    Advertisement Proceeds from website advertising help sustain Lab Tests Online. AACC is a not-for-profit organization ... for trustworthy health information. Verify Compliance . Produced by Advertisement

  2. NASA White Sands Test Facility Remote Hypervelocity Test Laboratory

    NASA Video Gallery

    Tour the NASA White Sands Test Facility's Remote Hypervelocity Test Laboratory in Las Cruces, New Mexico. To learn more about White Sands Test Facility, go to http://www.nasa.gov/centers/wstf/home/...

  3. Factors affecting laboratory test use and prices

    PubMed Central

    Danzon, Patricia Munch; Manning, Willard G.; Marquis, M. Susan

    1984-01-01

    The use of clinical laboratory tests has more than doubled during the past decade. Some observers of the health system feel that this growth is excessive and is a result of current payment systems. This article examines the effects of current reimbursement policies with regard to the use of laboratory tests and prices charged for tests. The results suggest the following: The method of financing medical care, including cost sharing and prepaid group practice arrangements, affects the volume of laboratory testing through the number of patient contacts with the medical care system rather than through the number of tests used per patient contact.Fee ceilings on physician time appear to be partially offset by higher test prices.Cost-based reimbursement for hospital services is associated with higher charges in hospital laboratories. PMID:10317549

  4. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the

  5. Crime Laboratory Proficiency Testing Research Program.

    ERIC Educational Resources Information Center

    Peterson, Joseph L.; And Others

    A three-year research effort was conducted to design a crime laboratory proficiency testing program encompassing the United States. The objectives were to: (1) determine the feasibility of preparation and distribution of different classes of physical evidence; (2) assess the accuracy of criminalistics laboratories in the processing of selected…

  6. "Certified" Laboratory Practitioners and the Accuracy of Laboratory Test Results.

    ERIC Educational Resources Information Center

    Boe, Gerard P.; Fidler, James R.

    1988-01-01

    An attempt to replicate a study of the accuracy of test results of medical laboratories was unsuccessful. Limitations of the obtained data prevented the research from having satisfactory internal validity, so no formal report was published. External validity of the study was also limited because the systematic random sample of 78 licensed…

  7. CERTS Microgrid Laboratory Test Bed

    SciTech Connect

    ETO, J.; LASSETER, R.; SCHENKMAN, B.; STEVENS, J.; KLAPP, D.; VOLKOMMER, H.; LINTON, E.; HURTADO, H.; ROY, J.

    2010-06-08

    The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1 a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2 an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3 a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources.

  8. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report and Appendices, Alameda-Contra Costa Transit District (AC Transit)

    SciTech Connect

    Chandler, K.; Eudy, L.

    2009-01-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).

  9. The Mars Science Laboratory Touchdown Test Facility

    NASA Technical Reports Server (NTRS)

    White, Christopher; Frankovich, John; Yates, Phillip; Wells Jr, George H.; Losey, Robert

    2009-01-01

    In the Touchdown Test Program for the Mars Science Laboratory (MSL) mission, a facility was developed to use a full-scale rover vehicle and an overhead winch system to replicate the Skycrane landing event.

  10. Antinuclear antibody testing: discordance between commercial laboratories.

    PubMed

    Abeles, Aryeh M; Gomez-Ramirez, Manuel; Abeles, Micha; Honiden, Shyoko

    2016-07-01

    Antinuclear antibody (ANA) test results frequently affect the course of patients' evaluations, diagnosis, and treatment, but different laboratory centers may yield conflicting results. This study investigated the degree of agreement between laboratory results in a group of subjects who had ANA testing performed at two commercial laboratories. This was a chart review study, in which all ANA tests ordered by the authors from one commercial laboratory over a 4-year period were queried. Corresponding patient charts were reviewed, and if ANA testing had also been performed at the second commercial laboratory, subjects were entered into the study. The primary measurement was agreement between paired ANA results, and we performed sensitivity analysis using varying criteria defining agreement (criteria A to criteria D [strictest to most lenient definition of agreement]). Other data captured included relevant data obtained through the course of evaluation (e.g., presenting complaints, exam findings, other laboratory data) and final diagnoses. Of 101 paired ANA tests, there was 18 % agreement according to the strictest criteria and 42 % according to the most lenient. Of the seven subjects with ANA-associated rheumatic disease, none of the paired tests were in agreement according to criteria A (two agreed according to criteria D). Our findings demonstrate poor agreement between paired ANA tests performed at two commercial laboratories. The low level of agreement may have far-reaching clinical implications. Specifically, this finding calls into question the reliability of ANA testing as it is currently performed and suggests that results may in part depend upon the laboratory center to which patients are referred. PMID:27044430

  11. Laboratory and diagnostic testing: a perioperative update.

    PubMed

    Pagana, Kathleen D

    2007-04-01

    Perioperative nurses are challenged to stay informed about the rapidly changing field of diagnostic and laboratory testing. The brain natriuretic peptide test primarily is used to differentiate dyspnea caused by heart failure from dyspnea that results from other causes. Virtual colonoscopy is a promising new alternative for detecting colorectal polyps and cancers. The microalbumin urine test provides an early indication of the development of diabetic complications. This update of relatively new laboratory tests and diagnostic studies also provides implications for perioperative nurses. PMID:17418132

  12. Managing laboratory test use: principles and tools.

    PubMed

    Jackson, Brian R

    2007-12-01

    It is difficult for unaided physicians to keep up with the scientific advances and changing practice guidelines relevant to ordering and interpreting laboratory tests. Overordering, underordering, and misordering of tests are all common, and specific practices vary tremendously from community to community. Pathologists and clinical laboratory scientists have valuable knowledge that can help treating physicians provide higher-quality and more cost-effective care. Laboratorians can use online test catalogs to steer physicians toward optimal test algorithms, with hyperlinking to journal articles, clinical guidelines, and other reference materials. Retrospective audit of ordering patterns can efficiently pinpoint educational needs specific to a physician community. PMID:17950895

  13. High-Speed Ring Bus

    NASA Technical Reports Server (NTRS)

    Wysocky, Terry; Kopf, Edward, Jr.; Katanyoutananti, Sunant; Steiner, Carl; Balian, Harry

    2010-01-01

    The high-speed ring bus at the Jet Propulsion Laboratory (JPL) allows for future growth trends in spacecraft seen with future scientific missions. This innovation constitutes an enhancement of the 1393 bus as documented in the Institute of Electrical and Electronics Engineers (IEEE) 1393-1999 standard for a spaceborne fiber-optic data bus. It allows for high-bandwidth and time synchronization of all nodes on the ring. The JPL ring bus allows for interconnection of active units with autonomous operation and increased fault handling at high bandwidths. It minimizes the flight software interface with an intelligent physical layer design that has few states to manage as well as simplified testability. The design will soon be documented in the AS-1393 standard (Serial Hi-Rel Ring Network for Aerospace Applications). The framework is designed for "Class A" spacecraft operation and provides redundant data paths. It is based on "fault containment regions" and "redundant functional regions (RFR)" and has a method for allocating cables that completely supports the redundancy in spacecraft design, allowing for a complete RFR to fail. This design reduces the mass of the bus by incorporating both the Control Unit and the Data Unit in the same hardware. The standard uses ATM (asynchronous transfer mode) packets, standardized by ITU-T, ANSI, ETSI, and the ATM Forum. The IEEE-1393 standard uses the UNI form of the packet and provides no protection for the data portion of the cell. The JPL design adds optional formatting to this data portion. This design extends fault protection beyond that of the interconnect. This includes adding protection to the data portion that is contained within the Bus Interface Units (BIUs) and by adding to the signal interface between the Data Host and the JPL 1393 Ring Bus. Data transfer on the ring bus does not involve a master or initiator. Following bus protocol, any BIU may transmit data on the ring whenever it has data received from its host. There

  14. Computer Controlled Test Systems. Introduction. A Course Based on the IEEE 488 Bus.

    ERIC Educational Resources Information Center

    Herrmann, Eric J.

    An introductory course in computer automated tests and measurement systems based on the International Test Instrument-Computer Interface Standard, the IEEE (Institute of Electrical and Electronics Engineers)-488, is presented in this study guide. This course is designed to: (1) introduce the electronics engineering technician to the functional…

  15. Mars Science Laboratory Spacecraft Assembled for Testing

    NASA Technical Reports Server (NTRS)

    2008-01-01

    The major components of NASA's Mars Science Laboratory spacecraft cruise stage atop the aeroshell, which has the descent stage and rover inside were connected together in October 2008 for several weeks of system testing, including simulation of launch vibrations and deep-space environmental conditions.

    These components will be taken apart again, for further work on each of them, after the environmental testing. The Mars Science Laboratory spacecraft is being assembled and tested for launch in 2011.

    This image was taken inside the Spacecraft Assembly Facility at NASA's Jet Propulsion Laboratory, Pasadena, Calif., which manages the Mars Science Laboratory Project for the NASA Science Mission Directorate, Washington. JPL is a division of the California Institute of Technology.

  16. Bus Training Handbook.

    ERIC Educational Resources Information Center

    Dorny, Audrea; Cole, ChiKay

    This manual presents guidelines for teaching students with disabilities necessary skills for safe and independent travel on public buses. Six guidelines for teachers include: (1) participate in bus training; (2) use wise and intelligent judgment; (3) utilize the bus checklist; (4) know and teach bus rules; (5) know bus routes; and (6) know bus…

  17. “Getting off the Bus Closer to Your Destination”: Patients’ Views about Pharmacogenetic Testing

    PubMed Central

    Trinidad, Susan Brown; Coffin, Tara B; Fullerton, Stephanie M; Ralston, James; Jarvik, Gail P; Larson, Eric B

    2015-01-01

    Context: Pharmacogenetic testing, a form of precision medicine, has the potential to optimize medication choice and dosing. Yet, relatively little is known about the views of patients—particularly those with chronic psychiatric conditions—with respect to such testing. Objective: To explore patients’ beliefs and attitudes regarding pharmacogenetic testing, with the goal of informing policy development and implementation. Design: Qualitative study design using semistructured focus groups with adults enrolled in Group Health Cooperative, a large health maintenance organization in the Pacific Northwest. We conducted focus groups with patients prescribed antidepressants (pilot session plus 2 focus groups, n = 27); patients prescribed carbamazepine (2 focus groups, n = 17); and healthy patients (2 focus groups, n = 17). Results: Although participants understood the potential advantages of pharmacogenetic testing, many felt that the risks (discrimination, stigmatization, physician overreliance on genomic results, and denial of certain medications) may outweigh the benefits. These concerns were shared across groups but were more strongly expressed among participants with chronic mental health diagnoses. Conclusion: Clinical implementation of pharmacogenetic testing must address patient concerns about privacy, discrimination, quality of care, and erosion of the physician-patient relationship. PMID:26057686

  18. Prototype Common Bus Spacecraft: Hover Test Implementation and Results. Revision, Feb. 26, 2009

    NASA Technical Reports Server (NTRS)

    Hine, Butler Preston; Turner, Mark; Marshall, William S.

    2009-01-01

    In order to develop the capability to evaluate control system technologies, NASA Ames Research Center (Ames) began a test program to build a Hover Test Vehicle (HTV) - a ground-based simulated flight vehicle. The HTV would integrate simulated propulsion, avionics, and sensors into a simulated flight structure, and fly that test vehicle in terrestrial conditions intended to simulate a flight environment, in particular for attitude control. The ultimate purpose of the effort at Ames is to determine whether the low-cost hardware and flight software techniques are viable for future low cost missions. To enable these engineering goals, the project sought to develop a team, processes and procedures capable of developing, building and operating a fully functioning vehicle including propulsion, GN&C, structure, power and diagnostic sub-systems, through the development of the simulated vehicle.

  19. 222-S LABORATORY FUME HOOD TESTING STUDY

    SciTech Connect

    RUELAS, B.H.

    2007-03-26

    The 222-S Laboratory contains 155 active fume hoods that are used to support analytical work with radioactive and/or toxic materials. The performance of a fume hood was brought into question after employees detected odors in the work area while mixing chemicals within the subject fume hood. Following the event, testing of the fume hood was conducted to assess the performance of the fume hood. Based on observations from the testing, it was deemed appropriate to conduct performance evaluations of other fume hoods within the laboratory.

  20. Development of a Multi-bus, Multi-source Reconfigurable Stirling Radioisotope Power System Test Bed

    NASA Technical Reports Server (NTRS)

    Coleman, Anthony S.

    2004-01-01

    The National Aeronautics and Space Administration (NASA) has typically used Radioisotope Thermoelectric Generators (RTG) as their source of electric power for deep space missions. A more efficient and potentially more cost effective alternative to the RTG, the high efficiency 110 watt Stirling Radioisotope Generator 110 (SRG110) is being developed by the Department of Energy (DOE), Lockheed Martin (LM), Stirling Technology Company (STC) and NASA Glenn Research Center (GRC). The SRG110 consists of two Stirling convertors (Stirling Engine and Linear Alternator) in a dual-opposed configuration, and two General Purpose Heat Source (GPHS) modules. Although Stirling convertors have been successfully operated as a power source for the utility grid and as a stand-alone portable generator, demonstration of the technology required to interconnect two Stirling convertors for a spacecraft power system has not been attempted. NASA GRC is developing a Power System Test Bed (PSTB) to evaluate the performance of a Stirling convertor in an integrated electrical power system application. This paper will describe the status of the PSTB and on-going activities pertaining to the PSTB in the NASA Thermal-Energy Conversion Branch of the Power and On-Board Propulsion Technology Division.

  1. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    SciTech Connect

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  2. Crush Testing at Oak Ridge National Laboratory

    SciTech Connect

    Feldman, Matthew R

    2011-01-01

    The dynamic crush test is required in the certification testing of some small Type B transportation packages. International Atomic Energy Agency regulations state that the test article must be 'subjected to a dynamic crush test by positioning the specimen on the target so as to suffer maximum damage.' Oak Ridge National Laboratory (ORNL) Transportation Technologies Group performs testing of Type B transportation packages, including the crush test, at the National Transportation Research Center in Knoxville, Tennessee (United States). This paper documents ORNL's experiences performing crush tests on several different Type B packages. ORNL has crush tested five different drum-type package designs, continuing its 60 year history of RAM package testing. A total of 26 crush tests have been performed in a wide variety of package orientations and crush plate CG alignments. In all cases, the deformation of the outer drum created by the crush test was significantly greater than the deformation damage caused by the 9 m drop test. The crush test is a highly effective means for testing structural soundness of smaller nondense Type B shipping package designs. Further regulatory guidance could alleviate the need to perform the crush test in a wide range of orientations and crush plate CG alignments.

  3. Battery testing at Argonne National Laboratory

    SciTech Connect

    DeLuca, W.H.; Gillie, K.R.; Kulaga, J.E.; Smaga, J.A.; Tummillo, A.F.; Webster, C.E.

    1993-03-25

    Argonne National Laboratory`s Analysis & Diagnostic Laboratory (ADL) tests advanced batteries under simulated electric and hybrid vehicle operating conditions. The ADL facilities also include a post-test analysis laboratory to determine, in a protected atmosphere if needed, component compositional changes and failure mechanisms. The ADL provides a common basis for battery performance characterization and life evaluations with unbiased application of tests and analyses. The battery evaluations and post-test examinations help identify factors that limit system performance and life, and the most-promising R&D approaches for overcoming these limitations. Since 1991, performance characterizations and/or life evaluations have been conducted on eight battery technologies (Na/S, Li/S, Zn/Br, Ni/MH, Ni/Zn, Ni/Cd, Ni/Fe, and lead-acid). These evaluations were performed for the Department of Energy`s. Office of Transportation Technologies, Electric and Hybrid Propulsion Division (DOE/OTT/EHP), and Electric Power Research Institute (EPRI) Transportation Program. The results obtained are discussed.

  4. SINGLE LABORATORY EVALUATION OF PHYTOTOXICITY TEST

    EPA Science Inventory

    The phytotoxicity method is a screening test used to predict the potential impact of chemicals on seed germination and early seedling growth. An evaluation of the procedure was conducted in order to establish the data quality that could be achieved within a single laboratory and ...

  5. Mars Science Laboratory Workstation Test Set

    NASA Technical Reports Server (NTRS)

    Henriquez, David A.; Canham, Timothy K.; Chang, Johnny T.; Villaume, Nathaniel

    2009-01-01

    The Mars Science Laboratory developed the Workstation TestSet (WSTS) is a computer program that enables flight software development on virtual MSL avionics. The WSTS is the non-real-time flight avionics simulator that is designed to be completely software-based and run on a workstation class Linux PC.

  6. 7 CFR 75.43 - Laboratory testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Laboratory testing. 75.43 Section 75.43 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... AND CERTIFICATION OF QUALITY OF AGRICULTURAL AND VEGETABLE SEEDS Fees and Charges § 75.43...

  7. 7 CFR 75.43 - Laboratory testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Laboratory testing. 75.43 Section 75.43 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... AND CERTIFICATION OF QUALITY OF AGRICULTURAL AND VEGETABLE SEEDS Fees and Charges § 75.43...

  8. 7 CFR 75.43 - Laboratory testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Laboratory testing. 75.43 Section 75.43 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... AND CERTIFICATION OF QUALITY OF AGRICULTURAL AND VEGETABLE SEEDS Fees and Charges § 75.43...

  9. 7 CFR 75.43 - Laboratory testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Laboratory testing. 75.43 Section 75.43 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... AND CERTIFICATION OF QUALITY OF AGRICULTURAL AND VEGETABLE SEEDS Fees and Charges § 75.43...

  10. 7 CFR 75.43 - Laboratory testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Laboratory testing. 75.43 Section 75.43 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... AND CERTIFICATION OF QUALITY OF AGRICULTURAL AND VEGETABLE SEEDS Fees and Charges § 75.43...

  11. Advanced Materials Laboratory User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Orndoff, Evelyne

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Advanced Materials Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. 1. VIEW EAST, COMPONENTS TEST LABORATORY SHOWING CATCH BASINS, TURBINE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW EAST, COMPONENTS TEST LABORATORY SHOWING CATCH BASINS, TURBINE TESTING AREA, AND PUMP TESTING TOWER. - Marshall Space Flight Center, East Test Area, Components Test Laboratory, Huntsville, Madison County, AL

  13. CTBTO Contractor Laboratory Test Sample Production Report

    SciTech Connect

    Bob Hague; Tracy Houghton; Nick Mann; Matt Watrous

    2013-08-01

    In October 2012 scientists from both Idaho National Laboratory (INL) and the CTBTO contact laboratory at Seibersdorf, Austria designed a system and capability test to determine if the INL could produce and deliver a short lived radio xenon standard in time for the standard to be measured at the CTBTO contact laboratory at Seibersdorf, Austria. The test included sample standard transportation duration and potential country entrance delays at customs. On October 23, 2012 scientists at the Idaho National Laboratory (INL) prepared and shipped a Seibersdorf contract laboratory supplied cylinder. The canister contained 1.0 scc of gas that consisted of 70% xenon and 30% nitrogen by volume. The t0 was October 24, 2012, 1200 ZULU. The xenon content was 0.70 +/ 0.01 scc at 0 degrees C. The 133mXe content was 4200 +/ 155 dpm per scc of stable xenon on t0 (1 sigma uncertainty). The 133Xe content was 19000 +/ 800 dpm per scc of stable xenon on t0 (1 sigma uncertainty).

  14. 42 CFR 493.1421 - Condition: Laboratories performing moderate complexity testing; testing personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... complexity testing; testing personnel. 493.1421 Section 493.1421 Public Health CENTERS FOR MEDICARE... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Moderate Complexity Testing § 493.1421 Condition: Laboratories performing moderate complexity testing; testing personnel....

  15. [Laboratory diagnosis of pregnancy begins: Abderhalden's test].

    PubMed

    Nieznanowska, Joanna

    2012-01-01

    The first decades of the twentieth century were the times of intensive search for a reliable laboratory test for early pregnancy. Among some tests proposed, the one developed in 1912 by a Swiss pioneer in clinical biochemistry, Emil Abderhalden, earned greatest response. Unlike other authors of pregnancy tests, Abderhalden claimed that his "defense ferments reaction" (Abwehrfermentsreaktion), if performed according to his methodology, was 100% specific and sensitive for pregnancy, even in its first weeks. Abderhalden's test raised much interest worldwide. Within the first few years from its first announcement, several hundred papers on the evaluation of the test's reliability were published, most of them enthusiastic. Variations of Abderhalden's test were hoped to work effectively as diagnostic tools in psychiatry, oncology, and internal diseases. Many clinicians believed that thanks to Abdehalden's method a wide range of conditions, such as schizophrenia, depression or cancers, could be unequivocally diagnosed with one serum test. In 1928, Abderhalden's reaction as a pregnancy test was replaced with the biological test developed by Aschheim and Zondek. In psychiatry, however, Abderhalden's test was used and evaluated as a diagnostic tool up till the 1930s. Only after Abderhalden's death in 1950 the "defense ferments reaction" was finally rejected as having no reliable scientific background. This paper presents the circumstances in which Emil Abderhalden developed his diagnostic test, the principles of the test, the methodology proposed by Abderhalden, as well as the response to the test and its variations in Germany and other countries. PMID:23767182

  16. Iowa Central Quality Fuel Testing Laboratory

    SciTech Connect

    Heach, Don; Bidieman, Julaine

    2013-09-30

    The objective of this project is to finalize the creation of an independent quality fuel testing laboratory on the campus of Iowa Central Community College in Fort Dodge, Iowa that shall provide the exploding biofuels industry a timely and cost-effective centrally located laboratory to complete all state and federal fuel and related tests that are required. The recipient shall work with various state regulatory agencies, biofuel companies and state and national industry associations to ensure that training and testing needs of their members and American consumers are met. The recipient shall work with the Iowa Department of Ag and Land Stewardship on the development of an Iowa Biofuel Quality Standard along with the Development of a standard that can be used throughout industry.

  17. Parachute Testing for Mars Science Laboratory

    NASA Technical Reports Server (NTRS)

    2007-01-01

    The team developing the landing system for NASA's Mars Science Laboratory tested the deployment of an early parachute design in mid-October 2007 inside the world's largest wind tunnel, at NASA Ames Research Center, Moffett Field, California.

    In this image, an engineer is dwarfed by the parachute, which holds more air than a 280-square-meter (3,000-square-foot) house and is designed to survive loads in excess of 36,000 kilograms (80,000 pounds).

    The parachute, built by Pioneer Aerospace, South Windsor, Connecticut, has 80 suspension lines, measures more than 50 meters (165 feet) in length, and opens to a diameter of nearly 17 meters (55 feet). It is the largest disk-gap-band parachute ever built and is shown here inflated in the test section with only about 3.8 meters (12.5 feet) of clearance to both the floor and ceiling.

    The wind tunnel, which is 24 meters (80 feet) tall and 37 meters (120 feet) wide and big enough to house a Boeing 737, is part of the National Full-Scale Aerodynamics Complex, operated by the U.S. Air Force, Arnold Engineering Development Center.

    NASA's Jet Propulsion Laboratory, Pasadena, California, is building and testing the Mars Science Laboratory spacecraft for launch in 2009. The mission will land a roving analytical laboratory on the surface of Mars in 2010. JPL is a division of the California Institute of Technology.

  18. Could light meal jeopardize laboratory coagulation tests?

    PubMed Central

    Lima-Oliveira, Gabriel; Salvagno, Gian Luca; Lippi, Giuseppe; Danese, Elisa; Gelati, Matteo; Montagnana, Martina; Picheth, Geraldo; Guidi, Gian Cesare

    2014-01-01

    Background: Presently the necessity of fasting time for coagulation tests is not standardized. Our hypothesis is that this can harm patient safety. This study is aimed at evaluating whether a light meal (i.e. breakfast) can jeopardize laboratory coagulation tests. Materials and methods: A blood sample was firstly collected from 17 fasting volunteers (12 h). Immediately after blood collection, the volunteers consumed a light meal. Then samples were collected at 1, 2 and 4 h after the meal. Coagulation tests included: activated partial thromboplastin time (APTT), prothrombin time (PT), fibrinogen (Fbg), antithrombin III (AT), protein C (PC) and protein S (PS). Differences between samples were assessed by Wilcoxon ranked-pairs test. The level of statistical significance was set at P < 0.05. Mean % differences were determined and differences between and baseline and 1, 2 and 4h samples were compared with reference change value (RCV). Results: A significantly higher % activity of AT was observed at 1 h and 4 h after meal vs. baseline specimen [113 (104–117) and 111 (107–120) vs. 109 (102–118), respectively; P = 0.029 and P = 0.016]. APTT at 2 h was found significantly lower than baseline samples [32.0 (29.9–34.8) vs. 34.1 (32.2–35.2), respectively; P = 0.041]. The results of both Fbg and PS tests were not influenced by a light meal. Furthermore, no coagulation tests had significant variation after comparison with RCV. Conclusion: A light meal does not influence the laboratory coagulation tests we assessed, but we suggest that the laboratory quality managers standardize the fasting time for all blood tests at 12 hours, to completely metabolize the lipids intake. PMID:25351352

  19. The Bus Stops Here.

    ERIC Educational Resources Information Center

    Milshtein, Amy

    1999-01-01

    Explores some of the factors to consider before school planners decide to buy new school buses. Provides a checklist to help build and maintain a bus fleet. Concludes by addressing bus safety and advertising. (GR)

  20. Battery testing at Argonne National Laboratory

    SciTech Connect

    DeLuca, W.H.; Gillie, K.R.; Kulaga, J.E.; Smaga, J.A.; Tummillo, A.F.; Webster, C.E.

    1993-03-25

    Argonne National Laboratory's Analysis Diagnostic Laboratory (ADL) tests advanced batteries under simulated electric and hybrid vehicle operating conditions. The ADL facilities also include a post-test analysis laboratory to determine, in a protected atmosphere if needed, component compositional changes and failure mechanisms. The ADL provides a common basis for battery performance characterization and life evaluations with unbiased application of tests and analyses. The battery evaluations and post-test examinations help identify factors that limit system performance and life, and the most-promising R D approaches for overcoming these limitations. Since 1991, performance characterizations and/or life evaluations have been conducted on eight battery technologies (Na/S, Li/S, Zn/Br, Ni/MH, Ni/Zn, Ni/Cd, Ni/Fe, and lead-acid). These evaluations were performed for the Department of Energy's. Office of Transportation Technologies, Electric and Hybrid Propulsion Division (DOE/OTT/EHP), and Electric Power Research Institute (EPRI) Transportation Program. The results obtained are discussed.

  1. Direct access testing in the clinical laboratory: should laboratories offer testing services directly to the consumer?

    PubMed

    Halsey, J F

    2000-01-01

    This article outlines the author's views on the many issues to consider if a laboratory plans to initiate a program to offer clinical laboratory testing directly to the public. Direct access testing and why is it important are discussed in detail. The regulatory issues are outlined with some alternatives for laboratories in states with restrictive regulations. To illustrate many of the operational issues to consider, the author describes the Personal Diagnostic Center (PDC) in Kansas City. Finally, some of the key business issues are mentioned, including several approaches to promote this type of testing program. PMID:11210210

  2. Mars Science Laboratory Rover System Thermal Test

    NASA Technical Reports Server (NTRS)

    Novak, Keith S.; Kempenaar, Joshua E.; Liu, Yuanming; Bhandari, Pradeep; Dudik, Brenda A.

    2012-01-01

    On November 26, 2011, NASA launched a large (900 kg) rover as part of the Mars Science Laboratory (MSL) mission to Mars. The MSL rover is scheduled to land on Mars on August 5, 2012. Prior to launch, the Rover was successfully operated in simulated mission extreme environments during a 16-day long Rover System Thermal Test (STT). This paper describes the MSL Rover STT, test planning, test execution, test results, thermal model correlation and flight predictions. The rover was tested in the JPL 25-Foot Diameter Space Simulator Facility at the Jet Propulsion Laboratory (JPL). The Rover operated in simulated Cruise (vacuum) and Mars Surface environments (8 Torr nitrogen gas) with mission extreme hot and cold boundary conditions. A Xenon lamp solar simulator was used to impose simulated solar loads on the rover during a bounding hot case and during a simulated Mars diurnal test case. All thermal hardware was exercised and performed nominally. The Rover Heat Rejection System, a liquid-phase fluid loop used to transport heat in and out of the electronics boxes inside the rover chassis, performed better than predicted. Steady state and transient data were collected to allow correlation of analytical thermal models. These thermal models were subsequently used to predict rover thermal performance for the MSL Gale Crater landing site. Models predict that critical hardware temperatures will be maintained within allowable flight limits over the entire 669 Sol surface mission.

  3. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report #2, Alameda-Contra Costa Transit District (AC Transit) and Appendices

    SciTech Connect

    Eudy, L.; Chandler, K.

    2010-06-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006, comparing similar diesel buses operating from the same depot. It covers November 2007 through February 2010. Results include implementation experience, fueling station operation, evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and road calls), and a summary of achievements and challenges encountered during the demonstration.

  4. Buyer Beware: Pitfalls in Toxicology Laboratory Testing.

    PubMed

    Algren, D Adam; Christian, Michael R

    2015-01-01

    Urine drug screens are commonly used in various clinical settings and situations. Immunoassays are the most commonly available method of testing for urine drug screens in hospitals. Although convenient, immunoassays are prone to false positive and false negative results. It is important for the health care provider to understand the principles of the laboratory methods involved with urine drug screens as this will help guide appropriate result interpretation and therefore improve clinical care. PMID:26168592

  5. Laboratory testing for secondary osteoporosis evaluation.

    PubMed

    Adler, Robert A

    2012-08-01

    Osteoporosis has been classified into primary and secondary forms. All patients with osteoporosis should have measurements of 25-hydroxyvitamin D, serum and urine calcium, and some estimation of renal function. There are a wide variety of disorders that lead to secondary osteoporosis, and the tests that confirm these diagnoses are described herein. Making the specific diagnosis is important because treatment of the underlying condition may be sufficient to lessen fracture risk, although some patients may also need usual treatment for osteoporosis. Laboratory testing in addition to a careful history and physical examination will often lead to diagnoses of treatable conditions. PMID:22333732

  6. The laboratory test utilization management toolbox

    PubMed Central

    Baird, Geoffrey

    2014-01-01

    Efficiently managing laboratory test utilization requires both ensuring adequate utilization of needed tests in some patients and discouraging superfluous tests in other patients. After the difficult clinical decision is made to define the patients that do and do not need a test, a wealth of interventions are available to the clinician and laboratorian to help guide appropriate utilization. These interventions are collectively referred to here as the utilization management toolbox. Experience has shown that some tools in the toolbox are weak and other are strong, and that tools are most effective when many are used simultaneously. While the outcomes of utilization management studies are not always as concrete as may be desired, what data is available in the literature indicate that strong utilization management interventions are safe and effective measures to improve patient health and reduce waste in an era of increasing financial pressure. PMID:24969916

  7. The laboratory test utilization management toolbox.

    PubMed

    Baird, Geoffrey

    2014-01-01

    Efficiently managing laboratory test utilization requires both ensuring adequate utilization of needed tests in some patients and discouraging superfluous tests in other patients. After the difficult clinical decision is made to define the patients that do and do not need a test, a wealth of interventions are available to the clinician and laboratorian to help guide appropriate utilization. These interventions are collectively referred to here as the utilization management toolbox. Experience has shown that some tools in the toolbox are weak and other are strong, and that tools are most effective when many are used simultaneously. While the outcomes of utilization management studies are not always as concrete as may be desired, what data is available in the literature indicate that strong utilization management interventions are safe and effective measures to improve patient health and reduce waste in an era of increasing financial pressure. PMID:24969916

  8. Automation software for a materials testing laboratory

    NASA Technical Reports Server (NTRS)

    Mcgaw, Michael A.; Bonacuse, Peter J.

    1986-01-01

    A comprehensive software system for automating much of the experimental process has recently been completed at the Lewis Research Center's high-temperature fatigue and structures laboratory. The system was designed to support experiment definition and conduct, results analysis and archiving, and report generation activities. This was accomplished through the design and construction of several software systems, as well as through the use of several commercially available software products, all operating on a local, distributed minicomputer system. Experimental capabilities currently supported in an automated fashion include both isothermal and thermomechanical fatigue and deformation testing capabilities. The future growth and expansion of this system will be directed toward providing multiaxial test control, enhanced thermomechanical test control, and higher test frequency (hundreds of hertz).

  9. Testing activities at the National Battery Test Laboratory

    NASA Astrophysics Data System (ADS)

    Hornstra, F.; Deluca, W. H.; Mulcahey, T. P.

    The National Battery Test Laboratory (NBTL) is an Argonne National Laboratory facility for testing, evaluating, and studying advanced electric storage batteries. The facility tests batteries developed under Department of Energy programs and from private industry. These include batteries intended for future electric vehicle (EV) propulsion, electric utility load leveling (LL), and solar energy storage. Since becoming operational, the NBTL has evaluated well over 1400 cells (generally in the form of three- to six-cell modules, but up to 140-cell batteries) of various technologies. Performance characterization assessments are conducted under a series of charge/discharge cycles with constant current, constant power, peak power, and computer simulated dynamic load profile conditions. Flexible charging algorithms are provided to accommodate the specific needs of each battery under test. Special studies are conducted to explore and optimize charge procedures, to investigate the impact of unique load demands on battery performance, and to analyze the thermal management requirements of battery systems.

  10. Laboratory tests of sludge-control additives

    SciTech Connect

    Tatnall, R.E.

    1996-07-01

    Laboratory {open_quotes}jar{close_quotes} tests compared eleven different fuel oil and diesel fuel sludge-control additives. Factors studied included (1) ability to disperse and prevent buildup of sludge deposits on surfaces, (2) ability to protect steel from corrosion, (3) ability to inhibit growth and proliferation of bacteria, and (4) ability to disperse water. Results varied greatly, and it was found that many commercial products do not do what they claim. It is concluded that fuel retailers should not believe manufacturers` claims for their additive products, but rather should test such products themselves to be sure that the benefits of treatment are real. A simplified form of the procedure used here is proposed as one way for dealers to do such testing.

  11. Laboratory procedures for waste form testing

    SciTech Connect

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  12. Test plan for ISV laboratory-pyrolysis testing

    SciTech Connect

    McAtee, R.E.

    1991-09-01

    The objective of the laboratory-pyrolysis studies is to obtain information on the high temperature (< 1200{degree}C) degradation and alteration of organic chemicals and materials similar to those found in the Radioactive Waste Management Complex, Pit 9. This test plan describes experimental procedures, sampling and analysis strategy, sampling procedures, sample control, and document management. It addresses safety issues in the experimental apparatus and procedures, personal training, and hazardous waste disposal. Finally, it describes the data quality objectives using the EPA tiered approach to treatability studies to define where research/scoping tests fit into these studies and the EPA analytical levels required for the tests.

  13. Laboratory rock mechanics testing manual. Public draft

    SciTech Connect

    Shuri, F S; Cooper, J D; Hamill, M L

    1981-10-01

    Standardized laboratory rock mechanics testing procedures have been prepared for use in the National Terminal Waste Storage Program. The procedures emphasize equipment performance specifications, documentation and reporting, and Quality Assurance acceptance criteria. Sufficient theoretical background is included to allow the user to perform the necessary data reduction. These procedures incorporate existing standards when possible, otherwise they represent the current state-of-the-art. Maximum flexibility in equipment design has been incorporated to allow use of this manual by existing groups and to encourage future improvements.

  14. Mars Science Laboratory Flight Software Internal Testing

    NASA Technical Reports Server (NTRS)

    Jones, Justin D.; Lam, Danny

    2011-01-01

    The Mars Science Laboratory (MSL) team is sending the rover, Curiosity, to Mars, and therefore is physically and technically complex. During my stay, I have assisted the MSL Flight Software (FSW) team in implementing functional test scripts to ensure that the FSW performs to the best of its abilities. There are a large number of FSW requirements that have been written up for implementation; however I have only been assigned a few sections of these requirements. There are many stages within testing; one of the early stages is FSW Internal Testing (FIT). The FIT team can accomplish this with simulation software and the MSL Test Automation Kit (MTAK). MTAK has the ability to integrate with the Software Simulation Equipment (SSE) and the Mission Processing and Control System (MPCS) software which makes it a powerful tool within the MSL FSW development process. The MSL team must ensure that the rover accomplishes all stages of the mission successfully. Due to the natural complexity of this project there is a strong emphasis on testing, as failure is not an option. The entire mission could be jeopardized if something is overlooked.

  15. Electronics systems test laboratory testing of shuttle communications systems

    NASA Technical Reports Server (NTRS)

    Stoker, C. J.; Bromley, L. K.

    1985-01-01

    Shuttle communications and tracking systems space to space and space to ground compatibility and performance evaluations are conducted in the NASA Johnson Space Center Electronics Systems Test Laboratory (ESTL). This evaluation is accomplished through systems verification/certification tests using orbiter communications hardware in conjunction with other shuttle communications and tracking external elements to evaluate end to end system compatibility and to verify/certify that overall system performance meets program requirements before manned flight usage. In this role, the ESTL serves as a multielement major ground test facility. The ESTL capability and program concept are discussed. The system test philosophy for the complex communications channels is described in terms of the major phases. Results of space to space and space to ground systems tests are presented. Several examples of the ESTL's unique capabilities to locate and help resolve potential problems are discussed in detail.

  16. Automation software for a materials testing laboratory

    NASA Technical Reports Server (NTRS)

    Mcgaw, Michael A.; Bonacuse, Peter J.

    1990-01-01

    The software environment in use at the NASA-Lewis Research Center's High Temperature Fatigue and Structures Laboratory is reviewed. This software environment is aimed at supporting the tasks involved in performing materials behavior research. The features and capabilities of the approach to specifying a materials test include static and dynamic control mode switching, enabling multimode test control; dynamic alteration of the control waveform based upon events occurring in the response variables; precise control over the nature of both command waveform generation and data acquisition; and the nesting of waveform/data acquisition strategies so that material history dependencies may be explored. To eliminate repetitive tasks in the coventional research process, a communications network software system is established which provides file interchange and remote console capabilities.

  17. Soft x-ray polarimeter laboratory tests

    NASA Astrophysics Data System (ADS)

    Murphy, Kendrah D.; Marshall, Herman L.; Schulz, Norbert S.; Jenks, Kevin; Sommer, Sophie J. B.; Marshall, Eric A.

    2010-07-01

    Multilayer-coated optics can strongly polarize X-rays and are central to a new design of a broad-band, soft X-ray polarimeter. We have begun laboratory work to verify the performance of components that could be used in future soft X-ray polarimetric instrumentation. We have reconfigured a 17 meter beamline facility, originally developed for testing transmission gratings for Chandra, to include a polarized X-ray source, an X-ray-dispersing transmission grating, and a multilayer-coated optic that illuminates a CCD detector. The X-rays produced from a Manson Model 5, multi-anode source are polarized by a multilayer-coated flat mirror. The current configuration allows for a 180 degree rotation of the source in order to rotate the direction of polarization. We will present progress in source characterization and system modulation measurements as well as null and robustness tests.

  18. Remotely accessible laboratory for MEMS testing

    NASA Astrophysics Data System (ADS)

    Sivakumar, Ganapathy; Mulsow, Matthew; Melinger, Aaron; Lacouture, Shelby; Dallas, Tim E.

    2010-02-01

    We report on the construction of a remotely accessible and interactive laboratory for testing microdevices (aka: MicroElectroMechancial Systems - MEMS). Enabling expanded utilization of microdevices for research, commercial, and educational purposes is very important for driving the creation of future MEMS devices and applications. Unfortunately, the relatively high costs associated with MEMS devices and testing infrastructure makes widespread access to the world of MEMS difficult. The creation of a virtual lab to control and actuate MEMS devices over the internet helps spread knowledge to a larger audience. A host laboratory has been established that contains a digital microscope, microdevices, controllers, and computers that can be logged into through the internet. The overall layout of the tele-operated MEMS laboratory system can be divided into two major parts: the server side and the client side. The server-side is present at Texas Tech University, and hosts a server machine that runs the Linux operating system and is used for interfacing the MEMS lab with the outside world via internet. The controls from the clients are transferred to the lab side through the server interface. The server interacts with the electronics required to drive the MEMS devices using a range of National Instruments hardware and LabView Virtual Instruments. An optical microscope (100 ×) with a CCD video camera is used to capture images of the operating MEMS. The server broadcasts the live video stream over the internet to the clients through the website. When the button is pressed on the website, the MEMS device responds and the video stream shows the movement in close to real time.

  19. Thermal-Structures and Materials Testing Laboratory

    NASA Technical Reports Server (NTRS)

    Teate, Anthony A.

    1997-01-01

    Since its inception and successful implementation in 1997 at James Madison University, the Thermal Structures and Materials Testing Laboratory (T-SaMTL) funded by the NASA Langley Research Center is evolving into one of the University's premier and exemplary efforts to increase minority representation in the sciences and mathematics. Serving ten (10) students and faculty directly and almost fifty (50) students indirectly, T-SAMTL, through its recruitment efforts, workshops, mentoring program, tutorial services and its research and computational laboratories has marked the completion of the first year with support from NASA totaling $ 100,000. Beginning as an innovative academic research and mentoring program for underrepresented minority science and mathematics students, the program now boasts a constituency which consists of 50% graduating seniors in the spring of 1998 with 50% planning to go to graduate school. The program's intent is to increase the number of underrepresented minorities who receive doctoral degrees in the sciences by initiating an academically enriched research program aimed at strengthening the academic and self actualization skills of undergraduate students with the potential to pursue doctoral study in the sciences. The program provides financial assistance, academic enrichment, and professional and personal development support for minority students who demonstrate the potential and strong desire to pursue careers in the sciences and mathematics. James Madison University was awarded the first $100,000, in April 1997, by The NASA Langley Research Center for establishment and support of its Thermal Structures and Materials Testing

  20. Transportable Heavy Duty Emissions Testing Laboratory and Research Program

    SciTech Connect

    David Lyons

    2008-03-31

    quantified during selected studies. A laboratory was established at WVU to provide for studies which supported and augmented the Translab research, and to provide for development of superior emissions measurement systems. This laboratory research focused on engine control and fuel sulfur issues. In recent years, as engine and aftertreatment technologies advanced, emissions levels were reduced such that they were at or below the Translab detectable limits, and in the same time frame the US Environmental Protection Agency required improved measurement methodologies for engine emissions certification. To remain current and relevant, the researchers designed a new Translab analytic system, housed in a container which can be transported on a semi-trailer. The new system's dilution tunnel flow was designed to use a subsonic venturi with closed loop control of blower speed, and the secondary dilution and particulate matter filter capture were designed to follow new EPA engine certification procedures. A further contribution of the program has been the development of techniques for creating heavy-duty vehicle test schedules, and the creation of schedules to mimic a variety of truck and bus vocations.

  1. Hydrogen powered bus

    ScienceCinema

    None

    2013-11-22

    Take a ride on a new type of bus, fueled by hydrogen. These hydrogen taxis are part of a Department of Energy-funded deployment of hydrogen powered vehicles and fueling infrastructure at nine federal facilities across the country to demonstrate this market-ready advanced technology. Produced and leased by Ford Motor Company , they consist of one 12- passenger bus and one nine-passenger bus. More information at: http://go.usa.gov/Tgr

  2. Fuel Cell Bus Takes a Starring Role in the BurbankBus Fleet (Fact Sheet)

    SciTech Connect

    Not Available

    2010-05-01

    This fact sheet reports on the City of Burbank, California's fuel cell bus demonstration project and the U.S. Department of Energy's (DOE) involvement. Included are specifications for the fuel cell bus and information about its operation. BurbankBus, the city's mass transit entity, received a grant from the California Air Resources Board to fund its zero-emission bus demonstration and is collaborating with DOE's Fuel Cell Technologies Program to evaluate the bus performance. DOE's National Renewable Energy Laboratory will collect and analyze performance and operations data for at least one year. Researchers will use the data to better understand the technology and determine future development work. In addition, demonstration information will help fleets make informed purchase decisions.

  3. 42 CFR 493.1403 - Condition: Laboratories performing moderate complexity testing; laboratory director.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing moderate complexity testing; laboratory director. 493.1403 Section 493.1403 Public Health CENTERS FOR MEDICARE... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Moderate Complexity...

  4. 42 CFR 493.1403 - Condition: Laboratories performing moderate complexity testing; laboratory director.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Condition: Laboratories performing moderate complexity testing; laboratory director. 493.1403 Section 493.1403 Public Health CENTERS FOR MEDICARE... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Moderate Complexity...

  5. 42 CFR 493.1403 - Condition: Laboratories performing moderate complexity testing; laboratory director.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Condition: Laboratories performing moderate complexity testing; laboratory director. 493.1403 Section 493.1403 Public Health CENTERS FOR MEDICARE... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Moderate Complexity...

  6. 42 CFR 493.1403 - Condition: Laboratories performing moderate complexity testing; laboratory director.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Condition: Laboratories performing moderate complexity testing; laboratory director. 493.1403 Section 493.1403 Public Health CENTERS FOR MEDICARE... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Moderate Complexity...

  7. 42 CFR 493.1403 - Condition: Laboratories performing moderate complexity testing; laboratory director.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Condition: Laboratories performing moderate complexity testing; laboratory director. 493.1403 Section 493.1403 Public Health CENTERS FOR MEDICARE... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Moderate Complexity...

  8. Mars Science Laboratory Boot Robustness Testing

    NASA Technical Reports Server (NTRS)

    Banazadeh, Payam; Lam, Danny

    2011-01-01

    Mars Science Laboratory (MSL) is one of the most complex spacecrafts in the history of mankind. Due to the nature of its complexity, a large number of flight software (FSW) requirements have been written for implementation. In practice, these requirements necessitate very complex and very precise flight software with no room for error. One of flight software's responsibilities is to be able to boot up and check the state of all devices on the spacecraft after the wake up process. This boot up and initialization is crucial to the mission success since any misbehavior of different devices needs to be handled through the flight software. I have created a test toolkit that allows the FSW team to exhaustively test the flight software under variety of different unexpected scenarios and validate that flight software can handle any situation after booting up. The test includes initializing different devices on spacecraft to different configurations and validate at the end of the flight software boot up that the flight software has initialized those devices to what they are suppose to be in that particular scenario.

  9. 19. Interior view of HVAC room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Interior view of HVAC room in Components Test Laboratory (T-27), looking toward east wall. Photograph shows upgraded instrumentation, machinery, and technological modifications for HVAC system installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  10. 18. Interior view of HVAC room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Interior view of HVAC room in Components Test Laboratory (T-27), showing northwest corner. Photograph shows upgraded instrumentation, piping, and technological modifications for HVAC system installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  11. 11. Interior view of control room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Interior view of control room in Components Test Laboratory (T-27), looking north. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  12. HERMES travels by CAN bus

    NASA Astrophysics Data System (ADS)

    Waller, Lewis G.; Shortridge, Keith; Farrell, Tony J.; Vuong, Minh; Muller, Rolf; Sheinis, Andrew I.

    2014-07-01

    The new HERMES spectrograph represents the first foray by AAO into the use of commercial off-the-shelf industrial field bus technology for instrument control, and we regard the final system, with its relatively simple wiring requirements, as a great success. However, both software and hardware teams had to work together to solve a number of problems integrating the chosen CANopen/CAN bus system into our normal observing systems. A Linux system running in an industrial PC chassis ran the HERMES control software, using a PCI CAN bus interface connected to a number of distributed CANopen/CAN bus I/O devices and servo amplifiers. In the main, the servo amplifiers performed impressively, although some experimentation with homing algorithms was required, and we hit a significant hurdle when we discovered that we needed to disable some of the encoders used during observations; we learned a lot about how servo amplifiers respond when their encoders are turned off, and about how encoders react to losing power. The software was based around a commercial CANopen library from Copley Controls. Early worries about how this heavily multithreaded library would work with our standard data acquisition system led to the development of a very low-level CANopen software simulator to verify the design. This also enabled the software group to develop and test almost all the control software well in advance of the construction of the hardware. In the end, the instrument went from initial installation at the telescope to successful commissioning remarkably smoothly.

  13. PinBus Interface Design

    SciTech Connect

    Hammerstrom, Donald J.; Adgerson, Jewel D.; Sastry, Chellury; Pratt, Richard M.; Pratt, Robert G.

    2009-12-30

    On behalf of the U.S. Department of Energy, PNNL has explored and expanded upon a simple control interface that might have merit for the inexpensive communication of smart grid operational objectives (demand response, for example) to small electric end-use devices and appliances. The approach relies on bi-directional communication via the electrical voltage states of from one to eight shared interconnection pins. The name PinBus has been suggested and adopted for the proposed interface protocol. The protocol is defined through the presentation of state diagrams and the pins’ functional definitions. Both simulations and laboratory demonstrations are being conducted to demonstrate the elegance and power of the suggested approach. PinBus supports a very high degree of interoperability across its interfaces, allowing innumerable pairings of devices and communication protocols and supporting the practice of practically any smart grid use case.

  14. Optimizing Tuberculosis Testing for Basic Laboratories

    PubMed Central

    Ramos, Eric; Schumacher, Samuel G.; Siedner, Mark; Herrera, Beatriz; Quino, Willi; Alvarado, Jessica; Montoya, Rosario; Grandjean, Louis; Martin, Laura; Sherman, Jonathan M.; Gilman, Robert H.; Evans, Carlton A.

    2010-01-01

    Optimal tuberculosis testing usually involves sputum centrifugation followed by broth culture. However, centrifuges are biohazardous and scarce in the resource-limited settings where most tuberculosis occurs. To optimize tuberculosis testing for these settings, centrifugation of 111 decontaminated sputum samples was compared with syringe-aspiration through polycarbonate membrane-filters that were then cultured in broth. To reduce the workload of repeated microscopic screening of broth cultures for tuberculosis growth, the colorimetric redox indicator 2,3-diphenyl-5-(2-thienyl) tetrazolium chloride was added to the broth, which enabled naked-eye detection of culture positivity. This combination of filtration and colorimetric growth-detection gave similar results to sputum centrifugation followed by culture microscopy regarding mean colony counts (43 versus 48; P = 0.6), contamination rates (0.9% versus 1.8%; P = 0.3), and sensitivity (94% versus 95%; P = 0.7), suggesting equivalency of the two methods. By obviating centrifugation and repeated microscopic screening of cultures, this approach may constitute a more appropriate technology for rapid and sensitive tuberculosis diagnosis in basic laboratories. PMID:20889887

  15. TRITIUM LABORATORY, TRA666, INTERIOR. HYDRAULIC TEST FACILITY. INSIDE LABORATORY 103. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TRITIUM LABORATORY, TRA-666, INTERIOR. HYDRAULIC TEST FACILITY. INSIDE LABORATORY 103. CAMERA FACES NORTH. INL NEGATIVE NO. HD46-24-1. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  16. 49 CFR 199.107 - Drug testing laboratory.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Drug testing laboratory. 199.107 Section 199.107... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.107 Drug testing laboratory. (a) Each operator shall use for the drug testing required by...

  17. 49 CFR 199.107 - Drug testing laboratory.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Drug testing laboratory. 199.107 Section 199.107... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.107 Drug testing laboratory. (a) Each operator shall use for the drug testing required by...

  18. 49 CFR 199.107 - Drug testing laboratory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Drug testing laboratory. 199.107 Section 199.107... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.107 Drug testing laboratory. (a) Each operator shall use for the drug testing required by...

  19. 49 CFR 199.107 - Drug testing laboratory.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Drug testing laboratory. 199.107 Section 199.107... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.107 Drug testing laboratory. (a) Each operator shall use for the drug testing required by...

  20. 49 CFR 199.107 - Drug testing laboratory.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Drug testing laboratory. 199.107 Section 199.107... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.107 Drug testing laboratory. (a) Each operator shall use for the drug testing required by...

  1. Fuel cell transit bus development & commercialization programs at Gerogetown University

    SciTech Connect

    Wimmer, R.; Larkins, J.; Romano, S.

    1996-12-31

    Fourteen years ago, Georgetown University (GU) perceived the need for a clean, efficient power systems for transportation that could operate on non-petroleum based fuels. The transit bus application was selected to begin system development. GU recognized the range and recharge constraints of a pure battery powered transit bus. A Fuel Cell power system would circumvent these limitations and, with an on board reformer, accommodate liquid fuel for rapid refueling. Feasibility studies for Fuel Cell power systems for transit buses were conducted with the Los Alamos National Laboratory in 1983. Successful results of this investigation resulted in the DOT/DOE Fuel Cell transit bus development program. The first task was to prove that small Fuel Cell power plants were possible. This was achieved with the Phase I development of two 25 kW Phosphoric Acid Fuel Cell (PAFC) brassboard systems. A liquid cooled version was selected for the Phase II activity in which three 30-foot Fuel Cell powered Test Bed Buses (TBBs) were fabricated. The first of these TBBs was delivered in the spring of 1994. All three of these development vehicles are now in Phase III of the program to conduct testing and evaluation, is conducting operational testing of the buses. The test will involve two fuel cell-operated buses; one with a proton exchange fuel cell and the other with a phosphoric acid fuel cell.

  2. The mass storage testing laboratory at GSFC

    NASA Technical Reports Server (NTRS)

    Venkataraman, Ravi; Williams, Joel; Michaud, David; Gu, Heng; Kalluri, Atri; Hariharan, P. C.; Kobler, Ben; Behnke, Jeanne; Peavey, Bernard

    1998-01-01

    Industry-wide benchmarks exist for measuring the performance of processors (SPECmarks), and of database systems (Transaction Processing Council). Despite storage having become the dominant item in computing and IT (Information Technology) budgets, no such common benchmark is available in the mass storage field. Vendors and consultants provide services and tools for capacity planning and sizing, but these do not account for the complete set of metrics needed in today's archives. The availability of automated tape libraries, high-capacity RAID systems, and high- bandwidth interconnectivity between processor and peripherals has led to demands for services which traditional file systems cannot provide. File Storage and Management Systems (FSMS), which began to be marketed in the late 80's, have helped to some extent with large tape libraries, but their use has introduced additional parameters affecting performance. The aim of the Mass Storage Test Laboratory (MSTL) at Goddard Space Flight Center is to develop a test suite that includes not only a comprehensive check list to document a mass storage environment but also benchmark code. Benchmark code is being tested which will provide measurements for both baseline systems, i.e. applications interacting with peripherals through the operating system services, and for combinations involving an FSMS. The benchmarks are written in C, and are easily portable. They are initially being aimed at the UNIX Open Systems world. Measurements are being made using a Sun Ultra 170 Sparc with 256MB memory running Solaris 2.5.1 with the following configuration: 4mm tape stacker on SCSI 2 Fast/Wide; 4GB disk device on SCSI 2 Fast/Wide; and Sony Petaserve on Fast/Wide differential SCSI 2.

  3. Laboratory tests of short intense envelope solitons

    NASA Astrophysics Data System (ADS)

    Slunyaev, A.; Clauss, G. F.; Klein, M.; Onorato, M.

    2012-04-01

    Stability of short intense nonlinear wave groups propagating over deep water is tested in laboratory runs which are performed in the facility of the Technical University of Berlin. The strongly nonlinear simulation of quasi-steady nonlinear wave groups within the framework of the Euler equations is used to generate the surface elevation time series at a border of the water tank. Besides, the exact analytic solution of the nonlinear Schrodinger equation is used for this purpose. The time series is then transformed to a wave maker signal with use of a designed transfer algorithm. Wave group propagation along the tank was recorded by 4 distant gauges and by an array of 6 densely situated gauges. This setup allows to consider the wave evolution from 10 to 85 m from the wave maker, and to obtain the wave envelope shape directly from the instrumental data. In the experiments wave groups were characterized by the steepness values up to kAcr < 0.32 and kAtr < 0.24, where k is the mean wavenumber, Acr is the crest amplitude, and Atr is the trough amplitude; and the maximum local wave slope was up to 0.34. Wave breaking phenomenon was not observed in the experiments. Different mean wave numbers and wave groups of different intensities were considered. In some cases the wave groups exhibit noticeable radiation in the course of propagation, though the groups are not dispersed fully. The effect of finite water depth is found to be significant on the wave group stability. Intense wave groups have shorter time of adjustment, what in some sense may help them to manifest their individuality clearer. The experimental tests confirm recent numerical simulations of fully nonlinear equations, where very steep stable single and interacting nonlinear wave groups were reported [1-3]. The quasi-stationary wave groups observed in numerical and laboratory experiments are strongly nonlinear analogues of the nonlinear Schrodinger envelope solitons. The results emphasize the importance of long

  4. Inverter testing at Sandia National Laboratories

    SciTech Connect

    Ginn, J.W.; Bonn, R.H.; Sittler, G.

    1997-04-01

    Inverters are key building blocks of photovoltaic (PV) systems that produce ac power. The balance of systems (BOS) portion of a PV system can account for up to 50% of the system cost, and its reliable operation is essential for a successful PV system. As part of its BOS program, Sandia National Laboratories (SNL) maintains a laboratory wherein accurate electrical measurements of power systems can be made under a variety of conditions. This paper outlines the work that is done in that laboratory.

  5. 42 CFR 493.1487 - Condition: Laboratories performing high complexity testing; testing personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing high complexity... REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1487 Condition: Laboratories performing high complexity testing; testing personnel. The laboratory has...

  6. 5. AERIAL PHOTO OF THE COMPONENTS TEST LABORATORY DURING THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. AERIAL PHOTO OF THE COMPONENTS TEST LABORATORY DURING THE CONSTRUCTION OF THE EAST TEST AREA. 1955, FRED ORDWAY COLLECTION, U.S. SPACE AND ROCKET CENTER, HUNTSVILLE, AL. - Marshall Space Flight Center, East Test Area, Components Test Laboratory, Huntsville, Madison County, AL

  7. 10. Interior view of control room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Interior view of control room in Components Test Laboratory (T-27), looking east. The control room is located in the center of the building and abuts the Test Cell 8, 9, and 10 and equipment room wings. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  8. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results

    SciTech Connect

    Chandler, K.; Eudy, L.

    2008-10-01

    This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.

  9. New technologies to improve laboratory testing

    NASA Astrophysics Data System (ADS)

    Burtis, C. A.

    Several core technologies that are having, or will have, an impact on the clinical laboratory are discussed. These include instrument-related technologies such as computer technology, chemometrics, robotics, sensors, and biological technologies such as cell fusion and recombinant DNA.

  10. Transportable Emissions Testing Laboratory for Alternative Vehicles Emissions Testing

    SciTech Connect

    Clark, Nigel

    2012-01-31

    The overall objective of this project was to perform research to quantify and improve the energy efficiency and the exhaust emissions reduction from advanced technology vehicles using clean, renewable and alternative fuels. Advanced vehicle and alternative fuel fleets were to be identified, and selected vehicles characterized for emissions and efficiency. Target vehicles were to include transit buses, school buses, vocational trucks, delivery trucks, and tractor-trailers. Gaseous species measured were to include carbon monoxide, carbon dioxide, oxides of nitrogen, hydrocarbons, and particulate matter. An objective was to characterize particulate matter more deeply than by mass. Accurate characterization of efficiency and emissions was to be accomplished using a state-of-the-art portable emissions measurement system and an accompanying chassis dynamometer available at West Virginia University. These two units, combined, are termed the Transportable Laboratory. An objective was to load the vehicles in a real-world fashion, using coast down data to establish rolling resistance and wind drag, and to apply the coast down data to the dynamometer control. Test schedules created from actual vehicle operation were to be employed, and a specific objective of the research was to assess the effect of choosing a test schedule which the subject vehicle either cannot follow or can substantially outperform. In addition the vehicle loading objective was to be met better with an improved flywheel system.

  11. 9 CFR 590.580 - Laboratory tests and analyses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Laboratory tests and analyses. 590.580... § 590.580 Laboratory tests and analyses. The official plant, at their expense, shall make tests and analyses to determine compliance with the Act and the regulations. (a) Samples shall be drawn from...

  12. 19 CFR 151.71 - Laboratory testing for clean yield.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF THE TREASURY (CONTINUED) EXAMINATION, SAMPLING, AND TESTING OF MERCHANDISE Wool and Hair § 151.71... director. (b) Notification to importer. Where samples of wool or hair have been tested in a Customs... laboratory test is not feasible, the wool or hair may be retested by a commercial laboratory in...

  13. 19 CFR 151.71 - Laboratory testing for clean yield.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF THE TREASURY (CONTINUED) EXAMINATION, SAMPLING, AND TESTING OF MERCHANDISE Wool and Hair § 151.71... director. (b) Notification to importer. Where samples of wool or hair have been tested in a Customs... laboratory test is not feasible, the wool or hair may be retested by a commercial laboratory in...

  14. 19 CFR 151.71 - Laboratory testing for clean yield.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF THE TREASURY (CONTINUED) EXAMINATION, SAMPLING, AND TESTING OF MERCHANDISE Wool and Hair § 151.71... director. (b) Notification to importer. Where samples of wool or hair have been tested in a Customs... laboratory test is not feasible, the wool or hair may be retested by a commercial laboratory in...

  15. 19 CFR 151.71 - Laboratory testing for clean yield.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF THE TREASURY (CONTINUED) EXAMINATION, SAMPLING, AND TESTING OF MERCHANDISE Wool and Hair § 151.71... director. (b) Notification to importer. Where samples of wool or hair have been tested in a Customs... laboratory test is not feasible, the wool or hair may be retested by a commercial laboratory in...

  16. 19 CFR 151.71 - Laboratory testing for clean yield.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF THE TREASURY (CONTINUED) EXAMINATION, SAMPLING, AND TESTING OF MERCHANDISE Wool and Hair § 151.71... director. (b) Notification to importer. Where samples of wool or hair have been tested in a Customs... laboratory test is not feasible, the wool or hair may be retested by a commercial laboratory in...

  17. Creative Bus Financing.

    ERIC Educational Resources Information Center

    Malone, Wade

    1982-01-01

    Alternative ways of financing school bus purchases include financing privately through contractors or commercial banks, financing through sources such as insurance companies and pension funds, leasing the buses, or contracting for transportation services. (Author/MLF)

  18. Bus.py

    Energy Science and Technology Software Center (ESTSC)

    2014-07-21

    GridLAB-D is an agent? based distribution system simulation environment that allows fine-grained end-user models, including geospatial and network topology detail. GridLAB-D addresses the lack of runtime interaction by designing a flexible communication interface, Bus.py (pronounced bus-dot-pie), that uses Python to pass messages between one or more GridLAB-D instances and a Smart Grid simulator.

  19. Savannah River bus project

    SciTech Connect

    Summers, W.A.

    1998-08-01

    The H2Fuel Bus is the world`s first hybrid hydrogen electric transit bus. It was developed through a public/private partnership involving several leading technology and industrial organizations in the Southeast, with primary funding and program management provided by the Department of Energy. The primary goals of the project are to gain valuable information on the technical readiness and economic viability of hydrogen buses and to enhance the public awareness and acceptance of emerging hydrogen technologies. The bus has been operated by the transit agency in Augusta, Georgia since April, 1997. It employs a hybrid IC engine/battery/electric drive system, with onboard hydrogen fuel storage based on the use of metal hydrides. Initial operating results have demonstrated an overall energy efficiency (miles per Btu) of twice that of a similar diesel-fueled bus and an operating range twice that of an all-battery powered electric bus. Tailpipe emissions are negligible, with NOx less than 0.2 ppm. Permitting, liability and insurance issues were addressed on the basis of extensive risk assessment and safety analyses, with the inherent safety characteristic of metal hydride storage playing a major role in minimizing these concerns. Future plans for the bus include continued transit operation and use as a national testbed, with potential modifications to demonstrate other hydrogen technologies, including fuel cells.

  20. Using Laboratory Models to Test Treatment

    PubMed Central

    Adams, Lewis; O'Donnell, Carl R.; Gilman, Sean A.; Lansing, Robert W.; Schwartzstein, Richard M.

    2011-01-01

    Rationale: Opioids are commonly used to relieve dyspnea, but clinical data are mixed and practice varies widely. Objectives: Evaluate the effect of morphine on dyspnea and ventilatory drive under well-controlled laboratory conditions. Methods: Six healthy volunteers received morphine (0.07 mg/kg) and placebo intravenously on separate days (randomized, blinded). We measured two responses to a CO2 stimulus: (1) perceptual response (breathing discomfort; described by subjects as “air hunger”) induced by increasing partial pressure of end-tidal carbon dioxide (PetCO2) during restricted ventilation, measured with a visual analog scale (range, “neutral” to “intolerable”); and (2) ventilatory response, measured in separate trials during unrestricted breathing. Measurements and Main Results: We determined the PetCO2 that produced a 60% breathing discomfort rating in each subject before morphine (median, 8.5 mm Hg above resting PetCO2). At the same PetCO2 after morphine administration, median breathing discomfort was reduced by 65% of its pretreatment value; P < 0.001. Ventilation fell 28% at the same PetCO2; P < 0.01. The effect of morphine on breathing discomfort was not significantly correlated with the effect on ventilatory response. Placebo had no effect. Conclusions: (1) A moderate morphine dose produced substantial relief of laboratory dyspnea, with a smaller reduction of ventilation. (2) In contrast to an earlier laboratory model of breathing effort, this laboratory model of air hunger established a highly significant treatment effect consistent in magnitude with clinical studies of opioids. Laboratory studies require fewer subjects and enable physiological measurements that are difficult to make in a clinical setting. Within-subject comparison of the response to carefully controlled laboratory stimuli can be an efficient means to optimize treatments before clinical trials. PMID:21778294

  1. Methods for Testing the Mars Science Laboratory's Landing Radar

    NASA Technical Reports Server (NTRS)

    Chapin, Elaine; Grando, Maurio B.; Hamilton, Gary A.; Pak, Kyung S.; Pollard, Brian D.; Shaffer, Scott J.; Wu, Chialin

    2013-01-01

    The Mars Science Laboratory's rover named Curiosity successfully landed on Mars on August 6, 2012. One component of the Mars Science Laboratory (MSL) Entry, Descent, and Landing (EDL) system was the Terminal Descent Sensor (TDS) landing radar. In this paper we describe laboratory testing of this radar performed before launch.

  2. 9. Exterior view, Test Cell 7, Systems Integration Laboratory Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Exterior view, Test Cell 7, Systems Integration Laboratory Building (T-28), looking southwest. The enclosure discussed in CO-88-B-8 is at the right. - Air Force Plant PJKS, Systems Integration Laboratory, Systems Integration Laboratory Building, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  3. 10 CFR 431.18 - Testing laboratories.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commerce. NIST/NVLAP accreditation is granted on the basis of conformance with criteria published in 15 CFR... Laboratory Accreditation Program for the Efficiency of Electric Motors field of accreditation. This handbook... Requirements, which contains 15 CFR Part 285 plus all general NIST/NVLAP procedures, criteria, and...

  4. 10 CFR 431.18 - Testing laboratories.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Commerce. NIST/NVLAP accreditation is granted on the basis of conformance with criteria published in 15 CFR... Laboratory Accreditation Program for the Efficiency of Electric Motors field of accreditation. This handbook... Requirements, which contains 15 CFR part 285 plus all general NIST/NVLAP procedures, criteria, and...

  5. 10 CFR 431.18 - Testing laboratories.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Commerce. NIST/NVLAP accreditation is granted on the basis of conformance with criteria published in 15 CFR... Laboratory Accreditation Program for the Efficiency of Electric Motors field of accreditation. This handbook... Requirements, which contains 15 CFR Part 285 plus all general NIST/NVLAP procedures, criteria, and...

  6. Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.; Taylor, Linda M.; Bell, Mark E.; Dolce, James L.; Fraeman, Martin; Frankford, David P.

    2015-01-01

    NASA Glenn Research Center developed a nonnuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASCs), Dual Convertor Controller (DCC) EMs (engineering models) 2 and 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University Applied Physics Laboratory (JHU/APL) to actively control a pair of ASCs. The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS), which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and super-capacitor. A load profile, created based on data from several missions, tested the RPS's and RSIL's ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 volts or exceeded 36 volts. Once operation was verified with the DASCS, the tests were repeated with actual operating ASCs. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

  7. Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.; Taylor, Linda M.; Bell, Mark E.; Dolce, James L.; Fraeman, Martin; Frankford, David P.

    2015-01-01

    NASA Glenn Research Center (GRC) developed a non-nuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASC), a Dual Convertor Controller (DCC) EM (engineering model) 2 & 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University/Applied Physics Laboratory (JHU/APL) to actively control a pair of Advanced Stirling Convertors (ASC). The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS) which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASC's in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and supercapacitor. A load profile, created based on data from several missions, tested the RPS and RSIL ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 V or exceeded 36 V. Once operation was verified with the DASCS, the tests were repeated with actual operating ASC's. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

  8. Workgroup for Hydraulic laboratory Testing and Verification of Hydroacoustic Instrumentation

    USGS Publications Warehouse

    Fulford, Janice M.; Armstrong, Brandy N.; Thibodeaux, Kirk G.

    2015-01-01

    An international workgroup was recently formed for hydraulic laboratory testing and verification of hydroacoustic instrumentation used for water velocity measurements. The activities of the workgroup have included one face to face meeting, conference calls and an inter-laboratory exchange of two acoustic meters among participating laboratories. Good agreement was found among four laboratories at higher tow speeds and poorer agreement at the lowest tow speed.

  9. Vending-Machine Repairman (bus. ser.; coin mach.) 639.381--Technical Report on Development on USES Aptitude Test Battery.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.

    The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…

  10. 9 CFR 590.580 - Laboratory tests and analyses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... § 590.580 Laboratory tests and analyses. The official plant, at their expense, shall make tests and... sequence, frequency, and approved laboratory methods as prescribed by the AMS Science Division Director... this section shall be provided to the inspector promptly upon receipt by the plant. If samples...

  11. 9 CFR 590.580 - Laboratory tests and analyses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... § 590.580 Laboratory tests and analyses. The official plant, at their expense, shall make tests and... sequence, frequency, and approved laboratory methods as prescribed by the AMS Science Division Director... this section shall be provided to the inspector promptly upon receipt by the plant. If samples...

  12. 9 CFR 590.580 - Laboratory tests and analyses.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... § 590.580 Laboratory tests and analyses. The official plant, at their expense, shall make tests and... sequence, frequency, and approved laboratory methods as prescribed by the AMS Science Division Director... this section shall be provided to the inspector promptly upon receipt by the plant. If samples...

  13. 19 CFR 151.54 - Testing by Customs laboratory.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Testing by Customs laboratory. 151.54 Section 151.54 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF... Other Metal-Bearing Materials § 151.54 Testing by Customs laboratory. Samples taken in accordance...

  14. 19 CFR 151.54 - Testing by Customs laboratory.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 2 2012-04-01 2012-04-01 false Testing by Customs laboratory. 151.54 Section 151.54 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF... Other Metal-Bearing Materials § 151.54 Testing by Customs laboratory. Samples taken in accordance...

  15. 7 CFR 58.442 - Laboratory and quality control tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Laboratory and quality control tests. 58.442 Section 58.442 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... Service 1 Operations and Operating Procedures § 58.442 Laboratory and quality control tests. (a)...

  16. 7 CFR 58.442 - Laboratory and quality control tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Laboratory and quality control tests. 58.442 Section 58.442 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... Service 1 Operations and Operating Procedures § 58.442 Laboratory and quality control tests. (a)...

  17. 7 CFR 58.442 - Laboratory and quality control tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Laboratory and quality control tests. 58.442 Section 58.442 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... Service 1 Operations and Operating Procedures § 58.442 Laboratory and quality control tests. (a)...

  18. Human Papillomavirus Laboratory Testing: the Changing Paradigm.

    PubMed

    Burd, Eileen M

    2016-04-01

    High-risk human papillomaviruses (HPVs) cause essentially all cervical cancers, most anal and oropharyngeal cancers, and some vaginal, vulvar, and penile cancers. Improved understanding of the pathogenesis of infection and the availability of newer tests are changing the approach to screening and diagnosis. Molecular tests to detect DNA from the most common high-risk HPVs are FDA approved for use in conjunction with cytology in cervical cancer screening programs. More-specific tests that detect RNA from high-risk HPV types are now also available. The use of molecular tests as the primary screening tests is being adopted in some areas. Genotyping to identify HPV16 and -18 has a recommended role in triaging patients for colposcopy who are high-risk HPV positive but have normal cytology. There are currently no recommended screening methods for anal, vulvar, vaginal, penile, or oropharyngeal HPV infections. HPV testing has limited utility in patients at high risk for anal cancer, but p16 immunohistochemistry is recommended to clarify lesions in tissue biopsy specimens that show moderate dysplasia or precancer mimics. HPV testing is recommended for oropharyngeal squamous cell tumors as a prognostic indicator. Ongoing research will help to improve the content of future guidelines for screening and diagnostic testing. PMID:26912568

  19. Laboratory Tests - Multiple Languages: MedlinePlus

    MedlinePlus

    ... Arabic (العربية) Chinese - Simplified (简体中文) Chinese - Traditional (繁體中文) French (français) Hindi (हिन्दी) Japanese (日本語) Khmer (Khmer) ... Chinese - Traditional) PDF Chinese Community Health Resource Center French (français) 24-Hour Urine Test Test d'urine ...

  20. National Media Laboratory media testing results

    NASA Technical Reports Server (NTRS)

    Mularie, William

    1993-01-01

    The government faces a crisis in data storage, analysis, archive, and communication. The sheer quantity of data being poured into the government systems on a daily basis is overwhelming systems ability to capture, analyze, disseminate, and store critical information. Future systems requirements are even more formidable: with single government platforms having data rate of over 1 Gbit/sec, greater than Terabyte/day storage requirements, and with expected data archive lifetimes of over 10 years. The charter of the National Media Laboratory (NML) is to focus the resources of industry, government, and academia on government needs in the evaluation, development, and field support of advanced recording systems.

  1. 7. YOSEMITE VALLEY SHUTTLE BUS AT SENTINEL BRIDGE SHUTTLE BUS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. YOSEMITE VALLEY SHUTTLE BUS AT SENTINEL BRIDGE SHUTTLE BUS AND PARKING LOT AREA. LOOKING WNW. GIS: N-37 40 36.2 / W-119 44 45.0 - Yosemite National Park Roads & Bridges, Yosemite Village, Mariposa County, CA

  2. Impact of Laboratory Test Use Strategies in a Turkish Hospital

    PubMed Central

    Yılmaz, Fatma Meriç; Kahveci, Rabia; Aksoy, Altan; Özer Kucuk, Emine; Akın, Tezcan; Mathew, Joseph Lazar; Meads, Catherine; Zengin, Nurullah

    2016-01-01

    Objectives Eliminating unnecessary laboratory tests is a good way to reduce costs while maintain patient safety. The aim of this study was to define and process strategies to rationalize laboratory use in Ankara Numune Training and Research Hospital (ANH) and calculate potential savings in costs. Methods A collaborative plan was defined by hospital managers; joint meetings with ANHTA and laboratory professors were set; the joint committee invited relevant staff for input, and a laboratory efficiency committee was created. Literature was reviewed systematically to identify strategies used to improve laboratory efficiency. Strategies that would be applicable in local settings were identified for implementation, processed, and the impact on clinical use and costs assessed for 12 months. Results Laboratory use in ANH differed enormously among clinics. Major use was identified in internal medicine. The mean number of tests per patient was 15.8. Unnecessary testing for chloride, folic acid, free prostate specific antigen, hepatitis and HIV testing were observed. Test panel use was pinpointed as the main cause of overuse of the laboratory and the Hospital Information System test ordering page was reorganized. A significant decrease (between 12.6–85.0%) was observed for the tests that were taken to an alternative page on the computer screen. The one year study saving was equivalent to 371,183 US dollars. Conclusion Hospital-based committees including laboratory professionals and clinicians can define hospital based problems and led to a standardized approach to test use that can help clinicians reduce laboratory costs through appropriate use of laboratory tests. PMID:27077653

  3. Multipurpose satellite bus (MPS)

    NASA Astrophysics Data System (ADS)

    The Naval Postgraduate School Advanced Design Project sponsored by the Universities Space Research Association Advanced Design Program is a multipurpose satellite bus (MPS). The design was initiated from a Statement of Work (SOW) developed by the Defense Advanced Research Projects Agency (DARPA). The SOW called for a 'proposal to design a small, low-cost, lightweight, general purpose spacecraft bus capable of accommodating any of a variety of mission payloads. Typical payloads envisioned include those associated with meteorological, communication, surveillance and tracking, target location, and navigation mission areas.' The design project investigates two dissimilar missions, a meteorological payload and a communications payload, mated with a single spacecraft bus with minimal modifications. The MPS is designed for launch aboard the Pegasus Air Launched Vehicle (ALV) or the Taurus Standard Small Launch Vehicle (SSLV).

  4. Multipurpose satellite bus (MPS)

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Naval Postgraduate School Advanced Design Project sponsored by the Universities Space Research Association Advanced Design Program is a multipurpose satellite bus (MPS). The design was initiated from a Statement of Work (SOW) developed by the Defense Advanced Research Projects Agency (DARPA). The SOW called for a 'proposal to design a small, low-cost, lightweight, general purpose spacecraft bus capable of accommodating any of a variety of mission payloads. Typical payloads envisioned include those associated with meteorological, communication, surveillance and tracking, target location, and navigation mission areas.' The design project investigates two dissimilar missions, a meteorological payload and a communications payload, mated with a single spacecraft bus with minimal modifications. The MPS is designed for launch aboard the Pegasus Air Launched Vehicle (ALV) or the Taurus Standard Small Launch Vehicle (SSLV).

  5. Pulmonary function testing in small laboratory mammals.

    PubMed Central

    O'Neil, J J; Raub, J A

    1984-01-01

    The lung is the primary organ likely to be exposed by inhalation studies and, therefore, measurement of changes in lung function are of particular interest to the pulmonary physiologist and toxicologist. Tests of pulmonary function have been developed which can be used with small animals to measure spirometry (lung volumes), mechanics, distribution of ventilation, gas exchange or control of ventilation. These tests were designed on the basis of similar tests which are used in humans to diagnose and manage patients with lung disease. A major difference is that many of the measurements are performed in anesthetized animals, while human pulmonary function is usually measured in awake cooperating individuals. In addition, the measurement of respiratory events in small animals requires sensitive and rapidly responding equipment, because signals may be small and events can occur quickly. In general, the measurements described provide information on the change in normal lung function which results primarily from structural changes. These tests of pulmonary function can be repetitively and routinely accomplished and the results appear to be highly reproducible. Although some are quite sophisticated, many can be undertaken with relatively inexpensive equipment and provide useful information for toxicological testing. PMID:6434299

  6. PULMONARY FUNCTION TESTING IN SMALL LABORATORY MAMMALS

    EPA Science Inventory

    The lung is the primary organ likely to be exposed by inhalation studies and, therefore, measurement of changes in lung function are of particular interest to the pulmonary physiologist and toxicologist. Tests of pulmonary function have been developed which can be used with small...

  7. Laboratory Tests - Multiple Languages: MedlinePlus

    MedlinePlus

    ... français) Hindi (हिन्दी) Japanese (日本語) Khmer (Khmer) Korean (한국어) Oromo (Afaan Oromo) Russian (Русский) Somali (af ... Collection Khmer (Khmer) Bilingual PDF Harborview Medical Center Korean (한국어) 24-Hour Urine Test 24-시간 소변검사 - ...

  8. Electronic Systems Test Laboratory (ESTL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Robinson, Neil

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  9. Structures Test Laboratory (STL). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Zipay, John J.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the STL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  10. Testing and Treating Women after Unsuccessful Conservative Treatments for Overactive Bladder or Mixed Urinary Incontinence: A Model-Based Economic Evaluation Based on the BUS Study

    PubMed Central

    Barton, Pelham; Middleton, Lee J.; Deeks, Jonathan J.; Daniels, Jane P.; Latthe, Pallavi; Coomarasamy, Arri; Rachaneni, Suneetha; McCooty, Shanteela; Verghese, Tina S.; Roberts, Tracy E.

    2016-01-01

    Objective To compare the cost-effectiveness of bladder ultrasonography, clinical history, and urodynamic testing in guiding treatment decisions in a secondary care setting for women failing first line conservative treatment for overactive bladder or urgency-predominant mixed urinary incontinence. Design Model-based economic evaluation from a UK National Health Service (NHS) perspective using data from the Bladder Ultrasound Study (BUS) and secondary sources. Methods Cost-effectiveness analysis using a decision tree and a 5-year time horizon based on the outcomes of cost per woman successfully treated and cost per Quality-Adjusted Life-Year (QALY). Deterministic and probabilistic sensitivity analyses, and a value of information analysis are also undertaken. Results Bladder ultrasonography is more costly and less effective test-treat strategy than clinical history and urodynamics. Treatment on the basis of clinical history alone has an incremental cost-effectiveness ratio (ICER) of £491,100 per woman successfully treated and an ICER of £60,200 per QALY compared with the treatment of all women on the basis of urodynamics. Restricting the use of urodynamics to women with a clinical history of mixed urinary incontinence only is the optimal test-treat strategy on cost-effectiveness grounds with ICERs of £19,500 per woman successfully treated and £12,700 per QALY compared with the treatment of all women based upon urodynamics. Conclusions remained robust to sensitivity analyses, but subject to large uncertainties. Conclusions Treatment based upon urodynamics can be seen as a cost-effective strategy, and particularly when targeted at women with clinical history of mixed urinary incontinence only. Further research is needed to resolve current decision uncertainty. PMID:27513926

  11. [Tuberculosis microepidemic in a commuter bus].

    PubMed

    Yagi, T; Sasaki, Y; Yamagishi, F; Mizutani, F; Wada, A; Kuroda, F

    1999-06-01

    A tuberculosis microepidemic in a commuter bus was reported. Index patient was a 22-year-old woman who was an employee of an electronic company. An abnormal shadow was found on her chest roentgenogram during an annual medical check-up in June, 1996. As her sputum smear was Gaffky 6, she was admitted to our hospital for medication. Extraordinary examinations including PPD skin test and chest X-ray were carried out on 49 employees of the company in October, 1996. As the result of these examinations, the distribution of maximum diameters of erythema in PPD skin test showed bimodal distribution, and tuberculosis was discovered in two patients by Chest X-ray examination. Moreover, preventive administration of Isonicotinic acid hydrazide (INH) was indicated for 3 employees based on very strong skin reaction to PPD. These five employees were working separately from the index patient and had little contact with the patient in the work places, but using a same commuter bus. Therefore, we strongly suspect that they were infected from the index patient not in the work place but in the commuter bus. The air-conditioning of the bus used a closed recirculation system, hence insufficient ventilation in the bus contributed to the spread of tuberculosis infection. PMID:10423962

  12. Laboratory test interpretations and algorithms in utilization management.

    PubMed

    Van Cott, Elizabeth M

    2014-01-01

    Appropriate assimilation of laboratory test results into patient care is enhanced when pathologist interpretations of the laboratory tests are provided for clinicians, and when reflex algorithm testing is utilized. Benefits of algorithms and interpretations include avoidance of misdiagnoses, reducing the number of laboratory tests needed, reducing the number of procedures, transfusions and admissions, shortening the amount of time needed to reach a diagnosis, reducing errors in test ordering, and providing additional information about how the laboratory results might affect other aspects of a patient's care. Providing interpretations can be challenging for pathologists, therefore mechanisms to facilitate the successful implementation of an interpretation service are described. These include algorithm-based testing and interpretation, optimizing laboratory requisitions and/or order-entry systems, proficiency testing programs that assess interpretations and provide constructive feedback, utilization of a collection of interpretive sentences or paragraphs that can be building blocks ("coded comments") for constructing preliminary interpretations, middleware, and pathology resident participation and education. In conclusion, the combination of algorithms and interpretations for laboratory testing has multiple benefits for the medical care for the patient. PMID:24080245

  13. Bus-Programmable Slave Card

    NASA Technical Reports Server (NTRS)

    Hall, William A.

    1990-01-01

    Slave microprocessors in multimicroprocessor computing system contains modified circuit cards programmed via bus connecting master processor with slave microprocessors. Enables interactive, microprocessor-based, single-loop control. Confers ability to load and run program from master/slave bus, without need for microprocessor development station. Tristate buffers latch all data and information on status. Slave central processing unit never connected directly to bus.

  14. Network Extender for MIL-STD-1553 Bus

    NASA Technical Reports Server (NTRS)

    Marcus, Julius; Hanson, T. David

    2003-01-01

    An extender system for MIL-STD-1553 buses transparently couples bus components at multiple developer sites. The bus network extender is a relatively inexpensive system that minimizes the time and cost of integration of avionic systems by providing a convenient mechanism for early testing without the need to transport the usual test equipment and personnel to an integration facility. This bus network extender can thus alleviate overloading of the test facility while enabling the detection of interface problems that can occur during the integration of avionic systems. With this bus extender in place, developers can correct and adjust their own hardware and software before products leave a development site. Currently resident at Johnson Space Center, the bus network extender is used to test the functionality of equipment that, although remotely located, is connected through a MILSTD- 1553 bus. Inasmuch as the standard bus protocol for avionic equipment is that of MIL-STD-1553, companies that supply MIL-STD-1553-compliant equipment to government or industry and that need long-distance communication support might benefit from this network bus extender

  15. Smallpox Vaccination of Laboratory Workers at US Variola Testing Sites

    PubMed Central

    Bilek, Laura; Hartman, Teresa; Iwen, Peter C.; Leuschen, Patricia; Miller, Hannah; O’Keefe, Anne; Sayles, Harlan; Smith, Philip W.

    2015-01-01

    To evaluate the need to revaccinate laboratory workers against smallpox, we assessed regular revaccination at the US Laboratory Response Network’s variola testing sites by examining barriers to revaccination and the potential for persistence of immunity. Our data do not provide evidence to suggest prolonging the recommended interval for revaccination. PMID:26196153

  16. 33 CFR 209.340 - Laboratory investigations and materials testing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Laboratory investigations and... THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.340 Laboratory investigations and... procedures applicable to the performance of investigations and tests at Corps of Engineers...

  17. Smallpox Vaccination of Laboratory Workers at US Variola Testing Sites.

    PubMed

    Medcalf, Sharon; Bilek, Laura; Hartman, Teresa; Iwen, Peter C; Leuschen, Patricia; Miller, Hannah; O'Keefe, Anne; Sayles, Harlan; Smith, Philip W

    2015-08-01

    To evaluate the need to revaccinate laboratory workers against smallpox, we assessed regular revaccination at the US Laboratory Response Network's variola testing sites by examining barriers to revaccination and the potential for persistence of immunity. Our data do not provide evidence to suggest prolonging the recommended interval for revaccination. PMID:26196153

  18. COMPUTERIZED LABORATORY NOTEBOOK CONCEPT FOR GENETIC TOXICOLOGY EXPERIMENTATION AND TESTING

    EPA Science Inventory

    We describe a microcomputer system utilizing the Computerized Laboratory Notebook (CLN) concept developed in our laboratory for the purpose of automating the Battery of Leukocyte Tests (BLT). The BLT was designed to evaluate blood specimens for toxic, immunotoxic, and genotoxic e...

  19. Augmented Thermal Bus

    NASA Technical Reports Server (NTRS)

    Schrage, Dean S. (Inventor)

    1996-01-01

    The present invention is directed to an augmented thermal bus. In the present design a plurality of thermo-electric heat pumps are used to couple a source plate to a sink plate. Each heat pump is individually controlled by a model based controller. The controller coordinates the heat pumps to maintain isothermality in the source.

  20. Augmented thermal bus

    NASA Technical Reports Server (NTRS)

    Schrage, Dean S. (Inventor)

    1993-01-01

    The present invention is directed to an augmented thermal bus. In the present design a plurity of thermo-electric heat pumps are used to couple a source plate to a sink plate. Each heat pump is individually controlled by a model based controller. The controller coordinates the heat pump to maintain isothermality in the source.

  1. Bully on the Bus

    ERIC Educational Resources Information Center

    Harrison, Mary M.

    2005-01-01

    Across the U.S., more than 24 million students begin and end their school days on buses. In most cases, the driver is the only adult on board. To transport students safely, the driver must watch the road, not the riders, during most of the trip. Although bus drivers have mirrors and usually see fights, they can easily miss pushing, shoving, and…

  2. SCHOOL BUS GARAGE.

    ERIC Educational Resources Information Center

    PALLIDINO, STEVE; STRIPLING, CHARLES W.

    COUNTY BOARDS, COUNTY SUPERINTENDENTS, SCHOOL PERSONNEL, AND ARCHITECTS PLANNING BUS GARAGE FACILITIES WILL FIND THIS PUBLICATION USEFUL. DECISIONS NEED TO BE MADE IN REGARD TO WHO WILL USE THE GARAGE, WHAT PURPOSE IT SHOULD SERVE, AND WHAT KIND OF SPACES ARE NEEDED. SITE SELECTION FACTORS TO BE CONSIDERED ARE LOCATION, PARKING SPACE, MANEUVERING…

  3. MANUAL FOR THE EVALUATION OF LABORATORIES PERFORMING AQUATIC TOXICITY TESTS

    EPA Science Inventory

    This manual describes guidelines and standardized procedures for conducting on-site audits and evaluations of laboratories performing toxicity tests. ncluded are pre-survey information activities, on-site evaluation activities, evaluation criteria, organizational history and labo...

  4. The Altitude Laboratory for the Test of Aircraft Engines

    NASA Technical Reports Server (NTRS)

    Dickinson, H C; Boutell, H G

    1920-01-01

    Report presents descriptions, schematics, and photographs of the altitude laboratory for the testing of aircraft engines constructed at the Bureau of Standards for the National Advisory Committee for Aeronautics.

  5. 42 CFR 493.1441 - Condition: Laboratories performing high complexity testing; laboratory director.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing high complexity testing; laboratory director. 493.1441 Section 493.1441 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  6. 42 CFR 493.1441 - Condition: Laboratories performing high complexity testing; laboratory director.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Condition: Laboratories performing high complexity testing; laboratory director. 493.1441 Section 493.1441 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  7. 42 CFR 493.1441 - Condition: Laboratories performing high complexity testing; laboratory director.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Condition: Laboratories performing high complexity testing; laboratory director. 493.1441 Section 493.1441 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  8. 42 CFR 493.1441 - Condition: Laboratories performing high complexity testing; laboratory director.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Condition: Laboratories performing high complexity testing; laboratory director. 493.1441 Section 493.1441 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  9. 42 CFR 493.1441 - Condition: Laboratories performing high complexity testing; laboratory director.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Condition: Laboratories performing high complexity testing; laboratory director. 493.1441 Section 493.1441 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  10. Recommended procedures for performance testing of radiobioassay laboratories: Volume 3, In vivo test phantoms

    SciTech Connect

    MacLellan, J.A.; Traub, R.J.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard describes the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay performance-testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of test phantoms used for calibration of measurement systems for direct bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented.

  11. [How to reduce unnecessary orders of laboratory tests].

    PubMed

    Shimbuno, Ayumi; Noharai, Masanobu; Enomoto, Makoto; Higa, Yukie; Araya, Kiyoshi; Ota, Toshiyuki

    2011-06-01

    The medical insurance system in Japan has been focusing on how to reduce the annual increases in medical expenses. In this context, the circumstances in the laboratory department in large hospitals have been growing more strict. Therefore, medical staff working in large hospitals need to know how to reduce the expenditure consumed in laboratory tests. In this paper we report economical loss resulted from physicians' excessive test-orders and suggest how to manage the problem. PMID:21702125

  12. Immediate needs for MQA testing at state secondary calibration laboratories

    SciTech Connect

    Cline, R.

    1993-12-31

    The Calibration Laboratory attempts to provide services that satisfy the needs and requests for a variety of customers. New needs and requests have resulted in calibration of instrumentation outside the original laboratory designs. These tasks require several changes at the laboratory and a need for new support services, especially measurement quality assurance (MQA). The MQA tests are gamma (Cs-137) below 0.5 mrem (5{mu}Sv) per hour and x-ray kVp. Modification to the current gamma (Cs-137) MQA test is recommended because lower intensity fields are commonly measured.

  13. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: First Results Report

    SciTech Connect

    Eudy, L.; Chandler, K.

    2011-03-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This report provides the early data results and implementation experience of the AT fuel cell bus since it was placed in service.

  14. Package testing capabilities at the Pacific Northwest Laboratory

    SciTech Connect

    Taylor, J.M.

    1993-01-01

    The purpose of this paper is to describe the package testing capabilities at the Pacific Northwest Laboratory (PNL). In the past all of the package testing that was performed at PNL was done on prototype or mocked up radioactive material packaging. Presently, we are developing the capability to perform testing on non-radioactive material packaging. The testing on the non-radioactive material packaging will be done to satisfy the new performance oriented packaging requirements (DOT Docket HM-181, 1991). This paper describes the equipment used to perform the performance oriented packaging tests and also describes some testing capability for testing radioactive material packaging.

  15. Package testing capabilities at the Pacific Northwest Laboratory

    SciTech Connect

    Taylor, J.M.

    1993-06-01

    The purpose of this paper is to describe the package testing capabilities at the Pacific Northwest Laboratory (PNL). In the past all of the package testing that was performed at PNL was done on prototype or mocked up radioactive material packaging. Presently, we are developing the capability to perform testing on non-radioactive material packaging. The testing on the non-radioactive material packaging will be done to satisfy the new performance oriented packaging requirements (DOT Docket HM-181, 1991). This paper describes the equipment used to perform the performance oriented packaging tests and also describes some testing capability for testing radioactive material packaging.

  16. Reducing unnecessary inpatient laboratory testing in a teaching hospital.

    PubMed

    May, Todd A; Clancy, Mary; Critchfield, Jeff; Ebeling, Fern; Enriquez, Anita; Gallagher, Carmel; Genevro, Jim; Kloo, Jay; Lewis, Paul; Smith, Rita; Ng, Valerie L

    2006-08-01

    After an inpatient phlebotomy-laboratory test request audit for 2 general inpatient wards identified 5 tests commonly ordered on a recurring basis, a multidisciplinary committee developed a proposal to minimize unnecessary phlebotomies and laboratory tests by reconfiguring the electronic order function to limit phlebotomy-laboratory test requests to occur singly or to recur within one 24-hour window. The proposal was implemented in June 2003. Comparison of fiscal year volume data from before (2002-2003) and after (2003-2004) implementation revealed 72,639 (12.0%) fewer inpatient tests, of which 41,765 (57.5%) were related directly to decreases in the 5 tests frequently ordered on a recurring basis. Because the electronic order function changes did not completely eliminate unnecessary testing, we concluded that the decrease in inpatient testing represented a minimum amount of unnecessary inpatient laboratory tests. We also observed 17,207 (21.4%) fewer inpatient phlebotomies, a decrease sustained in fiscal year 20042005. Labor savings allowed us to redirect phlebotomists to our understaffed outpatient phlebotomy service. PMID:16891194

  17. [Quality use of commercial laboratory for clinical testing services - considering laboratory's role].

    PubMed

    Ogawa, Shinji

    2014-12-01

    The number of commercial laboratories for clinical testing in Japan run privately has decreased to about 30 companies, and their business is getting tougher. Branch Lab. and FMS businesses have not expanded recently due to the new reimbursement system which adds an additional sample management fee, becoming effective in 2010. This presentation gives an outline of each role for hospital and commercial laboratories, and their pros & cons considering the current medical situation. Commercial laboratories have investigated how to utilize ICT systems for sharing test information between hospitals and our facilities. It would be very helpful to clarify issues for each hospital. We will develop and create new values for clinical laboratory testing services and forge mutually beneficial relationships with medical institutions. (Review). PMID:25823243

  18. Closing the brain-to-brain loop in laboratory testing.

    PubMed

    Plebani, Mario; Lippi, Giuseppe

    2011-07-01

    Abstract The delivery of laboratory services has been described 40 years ago and defined with the foremost concept of "brain-to-brain turnaround time loop". This concept consists of several processes, including the final step which is the action undertaken on the patient based on laboratory information. Unfortunately, the need for systematic feedback to improve the value of laboratory services has been poorly understood and, even more risky, poorly applied in daily laboratory practice. Currently, major problems arise from the unavailability of consensually accepted quality specifications for the extra-analytical phase of laboratory testing. This, in turn, does not allow clinical laboratories to calculate a budget for the "patient-related total error". The definition and use of the term "total error" refers only to the analytical phase, and should be better defined as "total analytical error" to avoid any confusion and misinterpretation. According to the hierarchical approach to classify strategies to set analytical quality specifications, the "assessment of the effect of analytical performance on specific clinical decision-making" is comprehensively at the top and therefore should be applied as much as possible to address analytical efforts towards effective goals. In addition, an increasing number of laboratories worldwide are adopting risk management strategies such as FMEA, FRACAS, LEAN and Six Sigma since these techniques allow the identification of the most critical steps in the total testing process, and to reduce the patient-related risk of error. As a matter of fact, an increasing number of laboratory professionals recognize the importance of understanding and monitoring any step in the total testing process, including the appropriateness of the test request as well as the appropriate interpretation and utilization of test results. PMID:21663564

  19. Operational experience on the Brookhaven National Laboratory Accelerator Test Facility

    SciTech Connect

    Batchelor, K.; Babzien, M.; Ben-Zvi, I.

    1994-09-01

    Brookhaven National Laboratory Accelerator Test Facility is a laser-electron linear accelerator complex designed to provide high brightness beams for testing of advanced acceleration concepts and high power pulsed photon sources. Results of electron beam parameters attained during the commissioning of the nominally 45 MeV energy machine are presented.

  20. An Education Program to Reduce Unnecessary Laboratory Tests by Residents.

    ERIC Educational Resources Information Center

    Dowling, Patrick T.; And Others

    1989-01-01

    A program at an inner-city community health center involving 20 family practice residents provided an educational intervention concerning the use of laboratory tests based on quality of care, not cost containment. During the program, the use of thyroid stimulating hormone test declined, while complete blood counts ordered did not. (MSE)

  1. 19 CFR 151.54 - Testing by Customs laboratory.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 2 2014-04-01 2014-04-01 false Testing by Customs laboratory. 151.54 Section 151.54 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) EXAMINATION, SAMPLING, AND TESTING OF MERCHANDISE Metal-Bearing Ores...

  2. 19 CFR 151.54 - Testing by Customs laboratory.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 2 2011-04-01 2011-04-01 false Testing by Customs laboratory. 151.54 Section 151.54 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) EXAMINATION, SAMPLING, AND TESTING OF MERCHANDISE Metal-Bearing Ores...

  3. 19 CFR 151.54 - Testing by Customs laboratory.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 2 2013-04-01 2013-04-01 false Testing by Customs laboratory. 151.54 Section 151.54 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) EXAMINATION, SAMPLING, AND TESTING OF MERCHANDISE Metal-Bearing Ores...

  4. 42 CFR 493.1409 - Condition: Laboratories performing moderate complexity testing; technical consultant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... complexity testing; technical consultant. 493.1409 Section 493.1409 Public Health CENTERS FOR MEDICARE... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Moderate Complexity Testing § 493.1409 Condition: Laboratories performing moderate complexity testing; technical consultant....

  5. Multiplex data bus simulator

    SciTech Connect

    Garbo, D.L.

    1983-01-01

    A multiplex data-bus simulator for analyzing multiprocessor designs is presented. The simulator was designed to be user-friendly, thus allowing a multiprocessor designer to enter various configuration inputs in a concise and orderly fashion through the use of menus. The designer is also provided a method of visualizing a message traffic flow through the use of graphical representation of events. 3 references.

  6. Bus application of oxygen-enrichment technology and diesel-electric hybrid systems

    SciTech Connect

    Sekar, R.R.; Marr, W.W.

    1993-10-01

    The amendments to the Clean Air Act (CAA) mandate very strict limits on particulate, smoke, and other emissions from city buses. The use of alternative fuels, such as compressed natural gas (CNG) or methanol, can help transit operators, such as the Chicago Transit Authority (CTA), meet the mandated limits. However, the capital investment needed to convert the fueling infrastructure and buses is large, as is the expense of training personnel. If a {open_quotes}clean diesel{close_quotes} bus can be implemented with the help of oxygen-enrichment technology or a diesel-electric hybrid system, this large investment could be postponed for many years. The Regional Transportation Authority (RTA) initiated this project to evaluate the possibility of applying these technologies to CTA buses. Argonne National Laboratory (ANL) conducted a limited number of engine tests and computer analyses and concluded that both concepts are practical and will help in a {open_quotes}clean diesel{close_quotes} bus that can meet the mandated limits of the CAA amendments. The oxygen enrichment of combustion air depends on the availability of a compact and economical membrane separator. Because the technology for this critical component is still under development, it is recommended that an actual bus demonstration be delayed until prototype membranes are available. The hybrid propulsion system is ready for the demonstration phase, and it is recommended that the CTA and RTA commence planning for a bus demonstration.

  7. Influencing behavior of physicians ordering laboratory tests: a literature study.

    PubMed

    Axt-Adam, P; van der Wouden, J C; van der Does, E

    1993-09-01

    There are various reasons why physicians order laboratory tests. Earlier studies have shown that in many cases test-ordering behavior lacks efficiency, resulting in excessive laboratory utilization. Throughout the years various attempts have been made to improve this situation. This review, based on the literature of the past 20 years, gives a survey of interventions and their effectiveness. Various types of education are discussed: general, cost-control oriented and education by means of guidelines, protocols, decision support systems, and feedback (on test ordering or cost). The discussion addresses the quality and apparent restrictions of the studies, and provides possible causes of the widely varying, but mostly low success rates. The long-term effectiveness of interventions aiming at better laboratory ordering is rather unfavorable. PMID:8366680

  8. Reproduction of natural corrosion by accelerated laboratory testing methods

    SciTech Connect

    Luo, J.S.; Wronkiewicz, D.J.; Mazer, J.J.; Bates, J.K.

    1996-05-01

    Various laboratory corrosion tests have been developed to study the behavior of glass waste forms under conditions similar to those expected in an engineered repository. The data generated by laboratory experiments are useful for understanding corrosion mechanisms and for developing chemical models to predict the long-term behavior of glass. However, it is challenging to demonstrate that these test methods produce results that can be directly related to projecting the behavior of glass waste forms over time periods of thousands of years. One method to build confidence in the applicability of the test methods is to study the natural processes that have been taking place over very long periods in environments similar to those of the repository. In this paper, we discuss whether accelerated testing methods alter the fundamental mechanisms of glass corrosion by comparing the alteration patterns that occur in naturally altered glasses with those that occur in accelerated laboratory environments. This comparison is done by (1) describing the alteration of glasses reacted in nature over long periods of time and in accelerated laboratory environments and (2) establishing the reaction kinetics of naturally altered glass and laboratory reacted glass waste forms.

  9. Laboratory for testing electro-optical surveillance systems

    NASA Astrophysics Data System (ADS)

    Chrzanowski, K.

    2011-05-01

    A modern laboratory capable to carry out expanded tests of all types of electro-optical surveillance systems (thermal imagers, TV/LLLTV cameras, night vision devices, laser range finders/designators/illuminators, multi-sensor surveillance systems) and basic modules of such surveillance systems (IR FPA/CCD/CMOS/EBAPS sensors, image intensifier tubes, optical objectives) was developed and is presented in this paper. The laboratory can be treated as a both scientific and technical achievement due to its several features. First, all important parameters of modern electro-optical surveillance systems or parameters of basic modules of such systems can be measured. Second, the laboratory is built using a set of semi-independent modular test stations. This modular concept enables easy creations of many versions optimized for different applications. Third, interpretation of the measurement data is supported by a set of specialized computer simulation programs. Fourth, all tests stations in the laboratory were developed by the same design team and are based on similar test concepts.. Because of these features the laboratory of electro-optical surveillance technology presented in this paper can be an optimal solutions for scientific centers or industrial companies who plan to enter and make quick progress in all main areas of surveillance technology.

  10. Five Proficiency Testing Programs for the Jcss Weight Calibration Laboratories

    NASA Astrophysics Data System (ADS)

    Ueki, Masaaki; Sun, Jianxin; Ueda, Kazunaga

    The Japan Calibration Service System (JCSS) organized in 1993 accredits the measurement capability of calibration laboratories and ensures the traceability to the national measurement standards. As an essential part of accreditation of the measurement capability of calibration laboratories for the weights, the International Accreditation Japan (IAJapan) of National Institute of Technology and Evaluation has been operating the JCSS proficiency testing programs with the technical support of the National Metrology Institute of Japan (NMIJ/AIST). Up to now, five proficiency testing programs have been carried out for the JCSS weight calibration laboratories in the range of 2 mg to 10 kg. The proficiency testing programs organized by the IAJapan were carried out in accordance with ISO/IEC Guide 43 (JIS Q 17043), and the NMIJ was responsible for the technical aspect as a reference laboratory. This paper describes the methods of the five proficiency testing programs during the period from 1997 to 2009, and outlines assessment of the measurement capability of the JCSS weight calibration laboratories.

  11. 75 FR 5847 - Section 5309 Bus and Bus Facilities Livability Initiative and Urban Circulator Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... general information on the Urban Circulator Program contact Elizabeth Day, Office of Planning and... Federal Transit Administration Section 5309 Bus and Bus Facilities Livability Initiative and Urban... Application Deadline for the Bus and Bus Facilities and Urban Circulator Livability Initiative...

  12. Laboratory or field tests for evaluating firefighters' work capacity?

    PubMed

    Lindberg, Ann-Sofie; Oksa, Juha; Malm, Christer

    2014-01-01

    Muscle strength is important for firefighters work capacity. Laboratory tests used for measurements of muscle strength, however, are complicated, expensive and time consuming. The aims of the present study were to investigate correlations between physical capacity within commonly occurring and physically demanding firefighting work tasks and both laboratory and field tests in full time (N = 8) and part-time (N = 10) male firefighters and civilian men (N = 8) and women (N = 12), and also to give recommendations as to which field tests might be useful for evaluating firefighters' physical work capacity. Laboratory tests of isokinetic maximal (IM) and endurance (IE) muscle power and dynamic balance, field tests including maximal and endurance muscle performance, and simulated firefighting work tasks were performed. Correlations with work capacity were analyzed with Spearman's rank correlation coefficient (rs). The highest significant (p<0.01) correlations with laboratory and field tests were for Cutting: IE trunk extension (rs = 0.72) and maximal hand grip strength (rs = 0.67), for Stairs: IE shoulder flexion (rs = -0.81) and barbell shoulder press (rs = -0.77), for Pulling: IE shoulder extension (rs = -0.82) and bench press (rs = -0.85), for Demolition: IE knee extension (rs = 0.75) and bench press (rs = 0.83), for Rescue: IE shoulder flexion (rs = -0.83) and bench press (rs = -0.82), and for the Terrain work task: IE trunk flexion (rs = -0.58) and upright barbell row (rs = -0.70). In conclusion, field tests may be used instead of laboratory tests. Maximal hand grip strength, bench press, chin ups, dips, upright barbell row, standing broad jump, and barbell shoulder press were strongly correlated (rs≥0.7) with work capacity and are therefore recommended for evaluating firefighters work capacity. PMID:24614596

  13. Duplicated laboratory tests: evaluation of a computerized alert intervention abstract.

    PubMed

    Bridges, Sharon A; Papa, Linda; Norris, Anne E; Chase, Susan K

    2014-01-01

    Redundant testing contributes to reductions in healthcare system efficiency. The purpose of this study was to: (1) determine if the use of a computerized alert would reduce the number and cost of duplicated Acute Hepatitis Profile (AHP) laboratory tests and (2) assess what patient, test, and system factors were associated with duplication. This study used a quasi-experimental pre- and post-test design to determine the proportion of duplication of the AHP test before and after implementation of a computerized alert intervention. The AHP test was duplicated if the test was requested again within 15 days of the initial test being performed and the result present in the medical record. The intervention consisted of a computerized alert (pop-up window) that indicated to the clinician that the test had recently been ordered. A total of 674 AHP tests were performed in the pre-intervention period and 692 in the postintervention group. In the pre-intervention period, 53 (7.9%) were duplicated and in postintervention, 18 (2.6%) were duplicated (p<.001). The implementation of the alert was shown to significantly reduce associated costs of duplicated AHP tests (p≤.001). Implementation of computerized alerts may be useful in reducing duplicate laboratory tests and improving healthcare system efficiency. PMID:22963261

  14. Energy-efficiency testing activities of the Mobile Energy Laboratory

    SciTech Connect

    Parker, G.B.

    1991-01-01

    This report summarizes energy-efficiency testing activities during the first and second quarters of fiscal year 1990 applying the Mobile Energy Laboratory (MEL) testing capabilities. Four MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) for energy testing and program support functions at federal facilities. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in the MEL Use Plan (PNL-6861) for semiannual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semiannually to establish priorities for energy-efficient testing applications using the MEL capabilities.

  15. Compendium of Test Results of Recent Single Event Effect Tests Conducted by the Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    McClure, Steven S.; Allen, Gregory R.; Irom, Farokh; Scheick, Leif Z.; Adell, Philippe C.; Miyahira, Tetsuo F.

    2010-01-01

    This paper reports heavy ion and proton-induced single event effect (SEE) results from recent tests for a variety of microelectronic devices. The compendium covers devices tested over the last two years by the Jet Propulsion Laboratory.

  16. Development of an integrated cryogenic bus for spacecraft applications

    NASA Astrophysics Data System (ADS)

    Bugby, David C.; Brennan, Patrick J.; Davis, Thomas M.; Tomlinson, Joe; Stoyanof, Marko; Crawford, Larry; Glaister, David S.

    1997-01-01

    To improve the efficiency and reduce the overdesign penalties associated with integrating cryogenic systems into spacecraft, the Integrated Cryogenic Bus (ICB) program was initiated in April 1996. The technical objectives of the program were to develop an integrated, lightweight means of thermally linking a cryogenic cooling source to a cooled satellite component, to commonize the interfaces to the cooling source and cooled component, and to commonize the integration of these systems into spacecraft. The technical plan involves several steps beginning with the definition of requirements, the identification and characterization of potential bus components, the development of new concepts and optimization methods, breadboard testing, and prototype development. Six months into the program, over 25 cryocooler, focal plane, and cryogenic hardware organizations have been interviewed or surveyed to identify requirements, numerous components have been identified and characterized, several preliminary concepts have been developed, an optimization plan has been outlined, and critical breadboard tests have begun. This paper summarizes the progress to date during Phase I of this Phillips Laboratory program funded by the Ballistic Missile Defense Organization (BMDO).

  17. Infection control in the pulmonary function test laboratory

    PubMed Central

    Rasam, Shweta Amol; Apte, Komalkirti Keshavkiran; Salvi, Sundeep Santosh

    2015-01-01

    Pulmonary function testing plays a crucial role in the diagnostic evaluation of patients with lung diseases. Cases of cross infection acquired from the pulmonary function laboratory, although rare, have been reported from various countries. It is therefore imperative to identify the risks and potential organisms implicated in cross infections in a pulmonary function test (PFT) laboratory and implement better and more effective infection control procedures, which will help in preventing cross infections. The infrastructure, the daily patient flow, and the prevalent disinfection techniques used in a PFT laboratory, all play a significant role in transmission of infections. Simple measures to tackle the cross infection potential in a PFT laboratory can help reduce this risk to a bare minimum. Use of specialized techniques and equipment can also be of much use in a set up that has a high turnover of patients. This review aims at creating awareness about the possible pathogens and situations commonly encountered in a PFT laboratory. We have attempted to suggest some relevant and useful infection control measures with regard to disinfection, sterilization, and patient planning and segregation to help minimize the risk of cross infections in a PFT laboratory. The review also highlights the lacuna in the current scenario of PFT laboratories in India and the need to develop newer and better methods of infection control, which will be more user-friendly and cost effective. Further studies to study the possible pathogens in a PFT laboratory and evaluate the prevalent infection control strategies will be needed to enable us to draw more precious conclusions, which can lead to more relevant, contextual recommendations for cross infections control in PFT lab in India. PMID:26180386

  18. Euro Data Bus

    SciTech Connect

    Engel, H.E.; Hall, J.R. II; Schrock, C.B.

    1995-12-31

    With the disintegration of the Soviet Union and the opening of the Iron Curtain, a downsizing of the Defense Establishment in the West is occurring, causing industry to look for opportunities where technology used for military applications can be applied to meet former East Block countries. Among these requirements has been the urgent desire of the people in former East Block countries for access to Western media which had been denied them, and has led to numerous opportunities for the implementation of Cable Television (CATV) systems. In addition, there are also requirements for utility metering for electricity, gas, water, heat, etc. which had previously been provided to the population by the Government at little or no cost. EWT of Augsburg, Germany, previously a subcontractor to ASEC on military security system projects, who has a subsidiary, TSS, which is a prominent CATV systems house, requested ASEC to provide a system which can provide utility meter reading and other control and monitoring services utilizing CATV. Working with CableBus Systems Corporation, a CATV data communications supplier and various utility meter manufacturers, ASEC, as the System Integrator, has developed a utilities monitoring system. This system. in cooperation with EWT, is being marketed and sold in Europe as EURO DATA BUS. This paper describes EURO DATA BUS and its applications, as well as the actual system designs for two pilot applications. One system is oriented at Utility Meter Reading and Demand side Management primarily, but will also be used to demonstrate other system capabilities such as security and fire alarm monitoring, etc. The design is therefore quite straightforward and {open_quotes}standard{close_quotes}. The second system has more of an industrial orientation and involves the monitoring and load control for a Municipal Electric Utility. While well within the capabilities of the system to accomplish, a more customized design was required to meet these requirements.

  19. Active control rotor model testing at Princeton's Rotorcraft Dynamics Laboratory

    NASA Technical Reports Server (NTRS)

    Mckillip, Robert M., Jr.

    1988-01-01

    A description of the model helicopter rotor tests currently in progress at Princeton's Rotorcraft Dynamics Laboratory is presented. The tests are designed to provide data for rotor dynamic modeling for use with active control system design. The model rotor to be used incoporates the capability for Individual Blade Control (IBC) or Higher Harmonic Control through the use of a standard swashplate on a three bladed hub. Sample results from the first series of tests are presented, along with the methodology used for state and parameter identification. Finally, pending experiments and possible research directions using this model and test facility are outlined.

  20. Test plan for demonstration of Rapid Transuranic Monitoring Laboratory

    SciTech Connect

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1993-06-01

    This plan describes tests to demonstrate the capability of the Rapid Transuranic Monitoring Laboratory (RTML) to monitor airborne alpha-emitting radionuclides and analyze soil, smear, and filter samples for alpha- and gamma-emitting radionuclides under field conditions. The RTML will be tested during June 1993 at a site adjacent to the Cold Test Pit at the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. Measurement systems installed in the RTML that will be demonstrated include two large-area ionization chamber alpha spectrometers, an x-ray/gamma-ray spectrometer, and four alpha continuous air monitors. Test objectives, requirements for data quality, experimental apparatus and procedures, and safety and logistics issues are described.

  1. OIL SPILL DISPERSANTS: MECHANISMS OF ACTION AND LABORATORY TESTS

    EPA Science Inventory

    Discussions are presented for (1) the mechanism of action of chemical dispersants for oil spills, (2) factors affecting performance of dispersants and its measurement, (3) some common laboratory methods that have been used to test dispersant performance, (4) a brief summary of di...

  2. Automatic rendezvous system testing at the Flight Robotics Laboratory

    NASA Technical Reports Server (NTRS)

    Tobbe, Patrick A.; Naumann, Charles B.

    1991-01-01

    The Flight Robotics Laboratory of MSFC provides sophisticated real time simulation capability in the study of human/system interactions of remote systems. This paper will describe the Flight Robotics Facility of NASA/MSFC, the hardware-in-the-loop simulation configuration, and test results.

  3. GATE AND VACUUM FLUSHING OF SEWER SEDIMENT: LABORATORY TESTING

    EPA Science Inventory

    The objective of this study was to test the performance of a traditional gate-flushing device and a newly-designed vacuum-flushing device in removing sediment from combined sewers and CSO storage tanks. A laboratory hydraulic flume was used to simulate a reach of sewer or storag...

  4. Results of Sandia National Laboratories grid-tied inverter testing

    SciTech Connect

    Kern, G.A.; Bonn, R.H.; Ginn, J.; Gonzalez, S.

    1998-07-01

    This paper proposes a definition for a Non-Islanding Inverter. This paper also presents methods that can be used to implement such an inverter, along with references to prior work on the subject. Justification for the definition is provided on both a theoretical basis and results from tests conducted at Sandia National Laboratories and Ascension Technology, Inc.

  5. Results of Laboratory Testing of Advanced Power Strips

    SciTech Connect

    Earle, L.; Sparn, B.

    2012-08-01

    Presented at the ACEEE Summer Study on Energy Efficiency in Buildings on August 12-17, 2012, this presentation reports on laboratory tests of 20 currently available advanced power strip products, which reduce wasteful electricity use of miscellaneous electric loads in buildings.

  6. Testing a Constrained MPC Controller in a Process Control Laboratory

    ERIC Educational Resources Information Center

    Ricardez-Sandoval, Luis A.; Blankespoor, Wesley; Budman, Hector M.

    2010-01-01

    This paper describes an experiment performed by the fourth year chemical engineering students in the process control laboratory at the University of Waterloo. The objective of this experiment is to test the capabilities of a constrained Model Predictive Controller (MPC) to control the operation of a Double Pipe Heat Exchanger (DPHE) in real time.…

  7. Performance testing of radiobioassay laboratories: In vivo measurements, Final Report

    SciTech Connect

    MacLellan, J.A.; Traub, R.J.; Olsen, P.C.

    1990-04-01

    A study of two rounds of in vivo laboratory performance testing was undertaken by Pacific Northwest Laboratory (PNL) to determine the appropriateness of the in vivo performance criteria of draft American National Standards Institute (ANSI) standard ANSI N13.3, Performance Criteria for Bioassay.'' The draft standard provides guidance to in vivo counting facilities regarding the sensitivity, precision, and accuracy of measurements for certain categories of commonly assayed radionuclides and critical regions of the body. This report concludes the testing program by presenting the results of the Round Two testing. Testing involved two types of measurements: chest counting for radionuclide detection in the lung, and whole body counting for detection of uniformly distributed material. Each type of measurement was further divided into radionuclide categories as defined in the draft standard. The appropriateness of the draft standard criteria by measuring a laboratory's ability to attain them were judged by the results of both round One and Round Two testing. The testing determined that performance criteria are set at attainable levels, and the majority of in vivo monitoring facilities passed the criteria when complete results were submitted. 18 refs., 18 figs., 15 tabs.

  8. An intelligent fiberoptic data bus for fly-by-light applications

    NASA Astrophysics Data System (ADS)

    Manoharan, L. C.; Muthuvel, S.

    An active fiberoptic data bus compatible with MIL-STD-1553B, which could be used for fly-by-light, stores management, AEW etc., on an aircraft has been developed. The data bus is considered intelligent because it can automatically sense which station is in the transmit mode and control the active interface accordingly, so that smooth flow of data takes place on the bus. The tests carried out on the bus including those on the Jaguar Avionics Rig to check its validity are also described. As no software is involved in the operation of the bus, this could be used on any aircraft having its own software.

  9. Safety in the Chemical Laboratory: Tested Disposal Methods for Chemical Wastes from Academic Laboratories.

    ERIC Educational Resources Information Center

    Armour, M. A.; And Others

    1985-01-01

    Describes procedures for disposing of dichromate cleaning solution, picric acid, organic azides, oxalic acid, chemical spills, and hydroperoxides in ethers and alkenes. These methods have been tested under laboratory conditions and are specific for individual chemicals rather than for groups of chemicals. (JN)

  10. Containment testing for occupied and unoccupied laboratory chemical hoods

    SciTech Connect

    Greenley, P.L.; DiBerardinis, L.J.; Lorch, F.A.

    1999-07-01

    Containment of hazards in a laboratory chemical hood is based on the principle that air drawn through the face area of the hood is sufficient to overcome the many challenges at or near the opening. Challenges to overcome include, but are not limited to, air velocities near the hood, movement of the researcher, people walking past the hood, location of equipment inside the hood, size of the sash opening, and the shape and configuration of entrance conditions. To overcome these challenges, a sufficient face velocity must be maintained. Determining that proper face velocity must be maintained. Determining that proper face velocity for a given hood should be resolved by the system designer, facility safety officer, and researcher with these and other issues in mind. This research tests for containment at 100 feet per minute (fpm) face velocity on occupied hoods and tests the same hoods for containment at the reduced velocity of 60 fpm when unoccupied. Three laboratory chemical hoods of different sizes with several ash positions are used. The test results show that under ideal conditions in a test laboratory, an unoccupied hood (without a manikin) at 60 fpm contains as good as, if not better than, an occupied hood (with a manikin) at 100 fpm, as measured by the tracer gas tests specified in ANSI/ASHRAE 110-1995, Method of Testing Performance of Laboratory Fume Hoods (ASHRAE 1995). Further testing is needed to determine if this relationship is the same under conditions of actual use, i.e., cluttered hoods and presence of cross-drafts.

  11. Automated cognitive testing of monkeys in social groups yields results comparable to individual laboratory based testing

    PubMed Central

    Gazes, Regina Paxton; Brown, Emily Kathryn; Basile, Benjamin M.; Hampton, Robert R.

    2013-01-01

    Cognitive abilities likely evolved in response to specific environmental and social challenges and are therefore expected to be specialized for the life history of each species. Specialized cognitive abilities may be most readily engaged under conditions that approximate the natural environment of the species being studied. While naturalistic environments might therefore have advantages over laboratory settings for cognitive research, it is difficult to conduct certain types of cognitive tests in these settings. We implemented methods for automated cognitive testing of monkeys (Macaca mulatta) in large social groups (Field station) and compared the performance to that of laboratory housed monkeys (Laboratory). The Field station animals shared access to four touch screen computers in a large naturalistic social group. Each Field station subject had an RFID chip implanted in each arm for computerized identification and individualized assignment of cognitive tests. The Laboratory group was housed and tested in a typical laboratory setting, with individual access to testing computers in their home cages. Monkeys in both groups voluntarily participated at their own pace for food rewards. We evaluated performance in two visual psychophysics tests, a perceptual classification test, a transitive inference test, and a delayed matching to sample memory test. Despite differences in housing, social environment, age, and sex, monkeys in the two groups performed similarly in all tests. Semi-free ranging monkeys living in complex social environments are therefore viable subjects for cognitive testing designed to take advantage of the unique affordances of naturalistic testing environments. PMID:23263675

  12. The laboratory's 2015 perspective on direct oral anticoagulant testing.

    PubMed

    Gosselin, R C; Adcock, D M

    2016-05-01

    The introduction of direct oral anticoagulant (DOAC) therapy into clinical use in the past 5 years has had significant impact on the clinical laboratory. Clinicians' desire to determine plasma drug presence or measure drug concentration, and more recent observations regarding the limitations and utility of coagulation testing in the setting of DOAC treatment, suggest that early published recommendations regarding laboratory testing should be reassessed. These initial recommendations, furthermore, were often based on drug-spiked plasma studies, rather than samples from patients receiving DOAC therapy. We have demonstrated that reagent sensitivity varies significantly whether drug-spiked samples or samples from DOAC-treated patients are tested. Data from drug-enriched samples must therefore be interpreted with caution or be used as a guide only. We present laboratory assays that can be used to determine drug presence and to measure drug concentration, and provide recommended testing algorithms. As DOAC therapy may significantly impact on specialty coagulation assays, we review those tests with the potential to give false-positive and false-negative results. PMID:26791879

  13. Comparison of Recuperator Alloy Degradation in Laboratory and Engine Testing

    SciTech Connect

    Pint, Bruce A; More, Karren Leslie; Trejo, Rosa M; Lara-Curzio, Edgar

    2008-01-01

    In order to increase the efficiency of advanced microturbines, durable alloy foils are needed for their recuperators to operate at 650-700 C. Prior work has demonstrated that water vapor in the exhaust gas causes more rapid consumption of Cr from austenitic alloys, leading to a reduction in lifetime for the thin-walled components in this application. New commercial alloy foils are being tested in both laboratory tests in humid air and in the exhaust gas of a modified 60 kW microturbine. Initial results are presented for a commercial batch of 80 {micro}m alloy 120 foil. The Cr consumption rates in laboratory testing were similar to those observed in previous testing. The initial results from the microturbine indicate a faster Cr consumption rate compared to the laboratory test, but longer term results are needed to quantify the difference. These results will help to verify a Cr consumption model for predicting lifetimes in this environment based on classical gas transport theory.

  14. [Patient satisfaction in a laboratory test collection unit].

    PubMed

    de Moura, Gisela Maria Schebella Souto; Hilleshein, Eunice Fabiani; Schardosim, Juliana Machado; Delgado, Kátia Simone

    2008-06-01

    This exploratory descriptive study aimed at identifying customer satisfaction attributes in the field of laboratory tests. Data were collected in 2006, using 104 interviews in a laboratorial unit inside a teaching hospital, using the critical incident technique, and submitted to content analysis. Three attribute categories were identified: time spent in waiting for care, interpersonal contact, and technical skills. These results subsidize the assessment of the current satisfaction survey tool, and point to its reformulation. They also allow the identification of improvement needs in customer attention, and provide elements to be taken into account in personnel selection, training programs, personnel performance assessment. PMID:18822760

  15. Tennessee Minimum School Bus Standards.

    ERIC Educational Resources Information Center

    Tennessee State Board of Education, 2004

    2004-01-01

    The School Bus Specifications and Procedures adopted by the 2000 National Conference on School Transportation and the Federal Motor Vehicle Safety Standards (FMVSS) were used as guides by the Tennessee State Board of Education Pupil Transportation Advisory Committee in developing the revised minimum specifications for school bus chassis and school…

  16. Improving School Bus Driver Performance.

    ERIC Educational Resources Information Center

    Farmer, Ernest

    This reference source is intended to assist the school bus driver training instructor in course preparation. Instructional units for program planning each contain pertinent course questions, a summary, and evaluation questions. Unit 1, "Introduction to the School Bus Driver Training Program," focuses on basic course objectives and requirements and…

  17. Nonlinear Ultrasonic Testing on a Laboratory Concrete Bridge Deck

    NASA Astrophysics Data System (ADS)

    Roe, Shannon E.; Woodward, C.; Cramer, M. J.

    2007-03-01

    Nonlinear ultrasonic testing has been shown to be extremely sensitive to distributed damage in concrete. Nonlinear nondestructive ultrasonic tests were performed on a laboratory bridge to detect distributed damage in the deck after it had been overloaded. The NLUT detected damage throughout the deck, and of particular interest in locations where damage was not visible. These results were compared to results obtained using pulse velocity tests at the same locations. The nonlinear ultrasonics were several orders of magnitude more sensitive than results obtained from pulse velocity.

  18. Thermocouple Calibration and Accuracy in a Materials Testing Laboratory

    NASA Technical Reports Server (NTRS)

    Lerch, B. A.; Nathal, M. V.; Keller, D. J.

    2002-01-01

    A consolidation of information has been provided that can be used to define procedures for enhancing and maintaining accuracy in temperature measurements in materials testing laboratories. These studies were restricted to type R and K thermocouples (TCs) tested in air. Thermocouple accuracies, as influenced by calibration methods, thermocouple stability, and manufacturer's tolerances were all quantified in terms of statistical confidence intervals. By calibrating specific TCs the benefits in accuracy can be as great as 6 C or 5X better compared to relying on manufacturer's tolerances. The results emphasize strict reliance on the defined testing protocol and on the need to establish recalibration frequencies in order to maintain these levels of accuracy.

  19. 49 CFR 40.85 - What drugs do laboratories test for?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false What drugs do laboratories test for? 40.85 Section 40.85 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.85 What drugs do laboratories test for? As a laboratory, you must test for...

  20. Laboratory diagnosis and interpretation of tests for syphilis.

    PubMed Central

    Larsen, S A; Steiner, B M; Rudolph, A H

    1995-01-01

    The lack of a method for demonstrating the presence of Treponema pallidum by growth necessitates the use of alternative methods. Traditionally, these methods are divided into direct detection methods (animal inoculation, dark-field microscopy, etc.) and serologic tests for the presence of patient antibody against T. pallidum. Serologic methods are further divided into two classes. One class, the nontreponemal tests, detects antibodies to lipoidal antigens present in either the host or T. pallidum; examples are the Venereal Disease Research Laboratory and rapid plasma reagin and tests. Reactivity in these tests generally indicates host tissue damage that may not be specific for syphilis. Because these tests are easy and inexpensive to perform, they are commonly used for screening, and with proper clinical signs they are suggestive of syphilis. The other class of test, the treponemal tests, uses specific treponemal antigens. Confirmation of infection requires a reactive treponemal test. Examples of the treponemal tests are the microhemagglutination assay for antibodies to T. pallidum and the fluorescent treponemal antibody absorption test. These tests are more expensive and complicated to perform than the nontreponemal tests. On the horizon are a number of direct antigen, enzyme-linked immunosorbent assay, and PCR techniques. Several of these techniques have shown promise in clinical trials for the diagnosis of congenital syphilis and neurosyphilis that are presently difficult to diagnose. PMID:7704889

  1. Data bus system development program

    NASA Technical Reports Server (NTRS)

    Harrison, J. S. J.

    1973-01-01

    Two data bus systems were designed fabricated, Data Bus System I and Data Bus System II. The technical features of the delivered hardware include the following: (1) 5 MHz selfclocking data bus; (2) bidirectional communications utilizing Manchester Code at data rates in excess of 20,000 words per second; (3) utilization of MSI COS/MOS technology (4) probability of accepting an erroneous data bit less than 1 in 10 to the 25th power (5) low power consumption (50 to 1 reduction in quiescent current over P/MOS) (6) compatibility with projected high density packaging. Three distinct types of data bus remote terminals were developed: the subsystem interface unit, the combination of an electronic interface unit and a standard interface unit-serial, and an SIU/Preprocessor.

  2. Laboratory Diagnostics Market in East Africa: A Survey of Test Types, Test Availability, and Test Prices in Kampala, Uganda

    PubMed Central

    Schroeder, Lee F.; Elbireer, Ali; Jackson, J. Brooks; Amukele, Timothy K.

    2015-01-01

    Background Diagnostic laboratory tests are routinely defined in terms of their sensitivity, specificity, and ease of use. But the actual clinical impact of a diagnostic test also depends on its availability and price. This is especially true in resource-limited settings such as sub-Saharan Africa. We present a first-of-its-kind report of diagnostic test types, availability, and prices in Kampala, Uganda. Methods Test types (identity) and availability were based on menus and volumes obtained from clinical laboratories in late 2011 in Kampala using a standard questionnaire. As a measure of test availability, we used the Availability Index (AI). AI is the combined daily testing volumes of laboratories offering a given test, divided by the combined daily testing volumes of all laboratories in Kampala. Test prices were based on a sampling of prices collected in person and via telephone surveys in 2015. Findings Test volumes and menus were obtained for 95% (907/954) of laboratories in Kampala city. These 907 laboratories offered 100 different test types. The ten most commonly offered tests in decreasing order were Malaria, HCG, HIV serology, Syphilis, Typhoid, Urinalysis, Brucellosis, Stool Analysis, Glucose, and ABO/Rh. In terms of AI, the 100 tests clustered into three groups: high (12 tests), moderate (33 tests), and minimal (55 tests) availability. 50% and 36% of overall availability was provided through private and public laboratories, respectively. Point-of-care laboratories contributed 35% to the AI of high availability tests, but only 6% to the AI of the other tests. The mean price of the most commonly offered test types was $2.62 (range $1.83–$3.46). Interpretation One hundred different laboratory test types were in use in Kampala in late 2011. Both public and private laboratories were critical to test availability. The tests offered in point-of-care laboratories tended to be the most available tests. Prices of the most common tests ranged from $1

  3. Testing hygrometers used in cytogenetics laboratories for metaphase preparation.

    PubMed

    Hartley, Thomas; Dun, Karen

    2011-07-01

    This protocol describes procedures for checking small laboratory hygrometers for accuracy at three relative humidity (rh) levels. The work arose out of the need to provide laboratory assessors with documentary evidence that the hygrometer used to monitor humidity in the vicinity of the laboratory where medical cytogenetics testing slides are prepared and dried in the ambient environment is reproducible and sufficiently accurate. The procedure is based upon the physicochemical principle that when water or certain saturated salt solutions are placed into a sealed environment, the humidity will equilibrate to well defined levels. We choose to check our hygrometers at three points: 95%, 75%, and 33% rh, using distilled water, saturated sodium chloride solution, and saturated magnesium chloride solution, respectively. Our results have demonstrated that the procedure is convenient and of sufficient accuracy to be fit for this annual hygrometer validation purpose. The procedure takes 24 hr per relative humidity point checked. PMID:21735375

  4. Laboratory or Field Tests for Evaluating Firefighters' Work Capacity?

    PubMed Central

    Lindberg, Ann-Sofie; Oksa, Juha; Malm, Christer

    2014-01-01

    Muscle strength is important for firefighters work capacity. Laboratory tests used for measurements of muscle strength, however, are complicated, expensive and time consuming. The aims of the present study were to investigate correlations between physical capacity within commonly occurring and physically demanding firefighting work tasks and both laboratory and field tests in full time (N = 8) and part-time (N = 10) male firefighters and civilian men (N = 8) and women (N = 12), and also to give recommendations as to which field tests might be useful for evaluating firefighters' physical work capacity. Laboratory tests of isokinetic maximal (IM) and endurance (IE) muscle power and dynamic balance, field tests including maximal and endurance muscle performance, and simulated firefighting work tasks were performed. Correlations with work capacity were analyzed with Spearman's rank correlation coefficient (rs). The highest significant (p<0.01) correlations with laboratory and field tests were for Cutting: IE trunk extension (rs = 0.72) and maximal hand grip strength (rs = 0.67), for Stairs: IE shoulder flexion (rs = −0.81) and barbell shoulder press (rs = −0.77), for Pulling: IE shoulder extension (rs = −0.82) and bench press (rs = −0.85), for Demolition: IE knee extension (rs = 0.75) and bench press (rs = 0.83), for Rescue: IE shoulder flexion (rs = −0.83) and bench press (rs = −0.82), and for the Terrain work task: IE trunk flexion (rs = −0.58) and upright barbell row (rs = −0.70). In conclusion, field tests may be used instead of laboratory tests. Maximal hand grip strength, bench press, chin ups, dips, upright barbell row, standing broad jump, and barbell shoulder press were strongly correlated (rs≥0.7) with work capacity and are therefore recommended for evaluating firefighters work capacity. PMID:24614596

  5. The dexamethasone suppression test: promises and problems of diagnostic laboratory tests in psychiatry.

    PubMed

    Insel, T R; Goodwin, F K

    1983-12-01

    Diagnostic tests in medicine must satisfy certain validity and accuracy criteria to be clinically useful. In psychiatry, the validity of a diagnostic procedure might be tested independently against clinical diagnosis, treatment response, and family history criteria; a strong relationship to any of the three would suggest clinical usefulness. Predictive value theory provides a model for such a test. The dexamethasone suppression test (DST) has a lower predictive value for major depressive disorder than most conventional laboratory tests used for diagnosis in medicine. In spite of promising early reports, the DST is not predictive of treatment response nor does it appear to identify genetic subtypes of depression. Although no diagnostic laboratory test is currently powerful enough for routine clinical use in psychiatry, laboratory tests may prove useful in predicting relapse and in continuing research on the psychobiology of mental disorders. PMID:6642460

  6. Radioactive material package testing capabilities at Sandia National Laboratories

    SciTech Connect

    Uncapher, W.L.; Hohnstreiter, G.F.

    1995-12-31

    Evaluation and certification of radioactive and hazardous material transport packages can be accomplished by subjecting these packages to normal transport and hypothetical accident test conditions. The regulations allow package designers to certify packages using analysis, testing, or a combination of analysis and testing. Testing can be used to substantiate assumptions used in analytical models and to demonstrate package structural and thermal response. Regulatory test conditions include impact, puncture, crush, penetration, water spray, immersion, and thermal environments. Testing facilities are used to simulate the required test conditions and provide measurement response data. Over the past four decades, comprehensive testing facilities have been developed at Sandia National Laboratories to perform a broad range of verification and certification tests on hazardous and radioactive material packages or component sections. Sandia`s facilities provide an experience base that has been established during the development and certification of many package designs. These unique facilities, along with innovative instrumentation data collection capabilities and techniques, simulate a broad range of testing environments. In certain package designs, package testing can be an economical alternative to complex analysis to resolve regulatory questions or concerns.

  7. In-flight and laboratory vacuum-friction test results

    NASA Technical Reports Server (NTRS)

    Devine, E. J.; Evans, H. E.; Leasure, W. A.

    1973-01-01

    Coefficient of friction measurements were made for six unlubricated metal couples exposed to the space environment aboard the OV-1-13 spacecraft and exposed to laboratory vacuum. Materials studied included mutually soluble, partially soluble, and insoluble metal combinations. Two samples of each material couple were tested in space and in the laboratory using the disk and rider technique. Linear velocity was 0.10 cm/s (2.5 in/min) and rider normal load was 4.45 N (1 lb) for the gold versus silver couples and 8.90 N (2lb) for the other combinations. Results showed that friction data obtained in a clean ion-pumped laboratory vacuum of 10 to the minus 10 power materials with low mutual solubility can be correlated to operation in the vicinity of a typical scientific spacecraft that is exposed to an ambient pressure as low as 10 to the minus 12 power torr. The expected increase in coefficient of friction with solubility was shown. Material couples with high mutual solubility present the hazard of unpredictable drastic friction increase in orbit which may not be evident in laboratory testing at levels down to 10 to the minus 10 power torr. It was also shown that gross cold welding of unlubricated metals exposed to a satellite environment does not occur.

  8. Weld Tests Conducted by the Idaho National Laboratory

    SciTech Connect

    Larry Zirker; Lance Lauerhass; James Dowalo

    2007-02-01

    During the fiscal year of 2006, the Idaho National Laboratory (INL) performed many tests and work relating to the Mobile Melt-Dilute (MMD) Project components. Tests performed on the Staubli quick disconnect fittings showed promising results, but more tests were needed validate the fittings. Changes were made to the shield plug design—reduced the closure groove weld depth between the top of the canister and the top plate of the shielding plug from 0.5-in to 0.375-in deep. Other changes include a cap to cover the fitting, lifting pintle and welding code citations on the prints. Tests conducted showed stainless steel tubing, with 0.25-in, 0.375-in, and 0.5-in diameters, all with 0.035-in wall thickness, could be pinch seal welded using commercially available resistance welding equipment. Subsequent testing showed that these welds could be real-time inspected with ultrasonic inspection methods.

  9. TEST PLAN FOR MONITORING COOLING COILS IN A LABORATORY SETTING

    SciTech Connect

    Don B. Shirey, III

    2002-04-01

    The objective of this research project is to understand and quantify the moisture removal performance of cooling coils at part-load conditions. The project will include a comprehensive literature review, detailed measurement of cooling coil performance in a laboratory facility, monitoring cooling systems at several field test sites, and development/validation of engineering models that can be used in energy calculations and building simulations. This document contains the detailed test plan for monitoring cooling coil performance in a laboratory setting. Detailed measurements will be taken on up to 10 direct expansion (DX) and chilled water cooling coils in various configurations to understand the impact of coil geometry and operating conditions on transient moisture condensation and evaporation.

  10. Preliminary test results with a Stirling Laboratory Research Engine

    NASA Technical Reports Server (NTRS)

    Hoehn, F. W.; Nguyen, B. D.; Schmit, D. D.

    1979-01-01

    The Jet Propulsion Laboratory has designed, assembled, and initiated testing of a Stirling Laboratory Research Engine (SLRE). This preprototype engine provides a research tool to support the development of a broad range of analytical modeling and experimental efforts. The SLRE is a horizontally opposed, two-piston, single-acting Stirling engine with a split crankshaft drive mechanism. The paper discusses the preliminary results obtained during engine motoring tests and compares these results with two different analytical prediction models. Comparisons are made between experiment, the classical Schmidt analysis, and the JPL Stirling Cycle Analysis Model (SCAM). SCAM is a computerized one-dimensional, cyclic, compressible flow model of the SLRE and consists of a compilation of individual component subroutines. The formulation and current state of development of the SCAM program is briefly described.

  11. 49 CFR 40.85 - What drugs do laboratories test for?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.85 What drugs do laboratories... test. You must not test “DOT specimens” for any other drugs. (a) Marijuana metabolites. (b)...

  12. 49 CFR 40.85 - What drugs do laboratories test for?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.85 What drugs do laboratories... test. You must not test “DOT specimens” for any other drugs. (a) Marijuana metabolites. (b)...

  13. 49 CFR 40.85 - What drugs do laboratories test for?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.85 What drugs do laboratories... test. You must not test “DOT specimens” for any other drugs. (a) Marijuana metabolites. (b)...

  14. 49 CFR 40.85 - What drugs do laboratories test for?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.85 What drugs do laboratories... test. You must not test “DOT specimens” for any other drugs. (a) Marijuana metabolites. (b)...

  15. Mars Science Laboratory Flight Software Boot Robustness Testing Project Report

    NASA Technical Reports Server (NTRS)

    Roth, Brian

    2011-01-01

    On the surface of Mars, the Mars Science Laboratory will boot up its flight computers every morning, having charged the batteries through the night. This boot process is complicated, critical, and affected by numerous hardware states that can be difficult to test. The hardware test beds do not facilitate testing a long duration of back-to-back unmanned automated tests, and although the software simulation has provided the necessary functionality and fidelity for this boot testing, there has not been support for the full flexibility necessary for this task. Therefore to perform this testing a framework has been build around the software simulation that supports running automated tests loading a variety of starting configurations for software and hardware states. This implementation has been tested against the nominal cases to validate the methodology, and support for configuring off-nominal cases is ongoing. The implication of this testing is that the introduction of input configurations that have yet proved difficult to test may reveal boot scenarios worth higher fidelity investigation, and in other cases increase confidence in the robustness of the flight software boot process.

  16. Hybrid Electric Transit Bus

    NASA Technical Reports Server (NTRS)

    Viterna, Larry A.

    1997-01-01

    A government, industry, and university cooperative is developing an advanced hybrid electric city transit bus. Goals of this effort include doubling the fuel economy compared to current buses and reducing emissions to one-tenth of current EPA standards. Unique aspects of the vehicle's power system include the use of ultra-capacitors as an energy storage system, and a planned natural gas fueled turbogenerator developed from a small jet engine. Power from both the generator and energy storage system is provided to a variable speed electric motor attached to the rear axle. At over 15000 kg gross weight, this is the largest vehicle of its kind ever built using ultra-capacitor energy storage. This paper describes the overall power system architecture, the evolution of the control strategy, and its performance over industry standard drive cycles.

  17. Federal laboratory nondestructive testing research and development applicable to industry

    SciTech Connect

    Smith, S.A.; Moore, N.L.

    1987-02-01

    This document presents the results of a survey of nondestructive testing (NDT) and related sensor technology research and development (R and D) at selected federal laboratories. Objective was to identify and characterize NDT activities that could be applied to improving energy efficiency and overall productivity in US manufacturing. Numerous federally supported R and D programs were identified in areas such as acoustic emissions, eddy current, radiography, computer tomography and ultrasonics. A Preliminary Findings Report was sent to industry representatives, which generated considerable interest.

  18. TESTING OF THE RADBALL TECHNOLOGY AT SAVANNAH RIVER NATIONAL LABORATORY

    SciTech Connect

    Farfan, E.; Foley, T.

    2010-02-10

    The United Kingdom's National Nuclear Laboratory (NNL) has developed a remote, nonelectrical, radiation-mapping device known as RadBall (patent pending), which offers a means to locate and quantify radiation hazards and sources within contaminated areas of the nuclear industry. Positive results from initial deployment trials in nuclear waste reprocessing plants at Sellafield in the United Kingdom and the anticipated future potential use of RadBall throughout the U.S. Department of Energy Complex have led to the NNL partnering with the Savannah River National Laboratory (SRNL) to further test, underpin, and strengthen the technical performance of the technology. The study completed at SRNL addresses key aspects of the testing of the RadBall technology. The first set of tests was performed at Savannah River Nuclear Solutions Health Physics Instrument Calibration Laboratory (HPICL) using various gamma-ray sources and an x-ray machine with known radiological characteristics. The objective of these preliminary tests was to identify the optimal dose and collimator thickness. The second set of tests involved a highly contaminated hot cell. The objective of this testing was to characterize a hot cell with unknown radiation sources. The RadBall calibration experiments and hot cell deployment were successful in that for each trial radiation tracks were visible. The deployment of RadBall can be accomplished in different ways depending on the size and characteristics of the contaminated area (e.g., a hot cell that already has a crane/manipulator available or highly contaminated room that requires the use of a remote control device with sensor and video equipment to position RadBall). This report also presents SRNL-designed RadBall accessories for future RadBall deployment (a harness, PODS, and robot).

  19. Biometric identification devices -- Laboratory testing vs. real life

    SciTech Connect

    Ahrens, J.S.

    1997-05-01

    For over fifteen years Sandia National Laboratories has been involved in laboratory testing of biometric identification devices. The key concept of biometric identification devices is the ability for the system to identify some unique aspect of the individual rather than some object a person may be carrying or some password they are required to know. Tests were conducted to verify manufacturer`s performance claims, to determine strengths/weaknesses of devices, and to determine devices that meet the US Department of energy`s needs. However, during recent field installation, significantly different performance was observed than was predicted by laboratory tests. Although most people using the device believed it operated adequately, the performance observed was over an order of magnitude worse than predicted. The search for reasons behind this gap between the predicted and the actual performance has revealed many possible contributing factors. As engineers, the most valuable lesson to be learned from this experience is the value of scientists and engineers with (1) common sense, (2) knowledge of human behavior, (3) the ability to observe the real world, and (4) the capability to realize the significant differences between controlled experiments and actual installations.

  20. Dementia workup. Deciding on laboratory testing for the elderly.

    PubMed Central

    Frank, C.

    1998-01-01

    OBJECTIVE: To review Canadian Consensus Conference on the Assessment of Dementia (CCCAD) guidelines for laboratory evaluation of dementia, and to make recommendations to family physicians based on these guidelines and other literature. DATA SOURCES: English-language data sources from 1992 to March 1997 were searched on MEDLINE using the MeSH headings dementia, dementia/diagnosis, and cognition. Key words relating to specific laboratory tests or conditions, such as neurosyphilis or vitamin B12, were also used. STUDY SELECTION: Original research articles using prospective and retrospective methods were accepted. Articles reviewing the general investigation of potentially reversible dementia were included, as were articles looking at the sensitivity, specificity, and utility of investigations for specific conditions causing dementia. SYNTHESIS: Family physicians are not always aware of CCCAD recommendations for the investigation of dementia. There was C-level evidence for use of CCCAD core investigations (complete blood count and electrolyte, glucose, calcium, and thyroid levels) and for tests to be done "when the clinical situation warrants" (B12 levels, computed tomography scan of the head, and testing for syphilis). CONCLUSIONS: The CCCAD guidelines were supported by most literature on the workup of dementia. Prospective cohort studies suggest use of clinical judgment in ordering laboratory investigations. No controlled trials were available, and most recommendations arose from consensus rather than from research evidence. The prevalence of reversible dementias is likely lower than previously believed, which further supports a selective approach to investigations. Identification of reversible causes and exacerbating factors is still the goal. PMID:9678278

  1. Determination of an Optimal Commercial Data Bus Architecture for a Flight Data System

    NASA Technical Reports Server (NTRS)

    Crawford, Kevin; Johnson, Martin; Humphries, Rick (Technical Monitor)

    2001-01-01

    NASA/Marshall Space Flight Center (MSFC) is continually looking for methods to reduce cost and schedule while keeping the quality of work high. MSFC is NASA's lead center for space transportation and microgravity research. When supporting NASA's programs several decisions concerning the avionics system must be made. Usually many trade studies must be conducted to determine the best ways to meet the customer's requirements. When deciding the flight data system, one of the first trade studies normally conducted is the determination of the data bus architecture. The schedule, cost, reliability, and environments are some of the factors that are reviewed in the determination of the data bus architecture. Based on the studies, the data bus architecture could result in a proprietary data bus or a commercial data bus. The cost factor usually removes the proprietary data bus from consideration. The commercial data bus's range from Versa Module Eurocard (VME) to Compact PCI to STD 32 to PC 104. If cost, schedule and size are prime factors, VME is usually not considered. If the prime factors are cost, schedule, and size then Compact PCI, STD 32 and PC104 are the choices for the data bus architecture. MSFC's center director has funded a study from his discretionary fund to determine an optimal low cost commercial data bus architecture. The goal of the study is to functionally and environmentally test Compact PCI, STD 32 and PC 104 data bus architectures. This paper will summarize the results of the data bus architecture study.

  2. The Brookhaven National Laboratory (BNL) Accelerator Test Facility

    SciTech Connect

    Batchelor, K.

    1990-01-01

    The design of the Brookhaven National Laboratory Accelerator Test Facility is presented including the design goals and computational results. The heart of the system is a radiofrequency electron gun utilizing a photo-excited metal cathode followed by a conventional electron linac. The Nd:YAG laser used to drive the cathode with 6 ps long pulses can be synchronized to a high peak power CO{sub 2} laser in order to study laser acceleration of electrons. Current operational status of the project will be presented along with early beam tests.

  3. 49 CFR 40.91 - What validity tests must laboratories conduct on primary specimens?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.91 What validity tests must laboratories conduct on primary specimens? As a laboratory, when you conduct validity... 49 Transportation 1 2012-10-01 2012-10-01 false What validity tests must laboratories conduct...

  4. 49 CFR 40.91 - What validity tests must laboratories conduct on primary specimens?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.91 What validity tests must laboratories conduct on primary specimens? As a laboratory, when you conduct validity... 49 Transportation 1 2011-10-01 2011-10-01 false What validity tests must laboratories conduct...

  5. 49 CFR 40.91 - What validity tests must laboratories conduct on primary specimens?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.91 What validity tests must laboratories conduct on primary specimens? As a laboratory, when you conduct validity... 49 Transportation 1 2014-10-01 2014-10-01 false What validity tests must laboratories conduct...

  6. Proposals for ORNL (Oak Ridge National Laboratory) support to Tiber LLNL (Lawrence Livermore National Laboratory). [Engineering Test Reactor

    SciTech Connect

    Berry, L.A.; Rosenthal, M.W.; Saltmarsh, M.J.; Shannon, T.E.; Sheffield, J.

    1987-01-27

    This document describes the interests and capabilities of Oak Ridge National Laboratory in their proposals to support the Lawrence Livermore National Laboratory (LLNL) Engineering Test Reactor (ETR) project. Five individual proposals are cataloged separately. (FI)

  7. Mobile Energy Laboratory energy-efficiency testing programs

    NASA Astrophysics Data System (ADS)

    Parker, G. B.; Currie, J. W.

    1991-09-01

    This report summarizes energy-efficiency testing activities applying the Mobile Energy Laboratory (MEL) testing capabilities during the first and second quarters of fiscal year (FY) 1991. The MELs, developed by the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) and the Naval Energy and Environmental Support Activity (NEESA) for energy testing and energy conservation program support functions at Federal facilities. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in Section 8 of the MEL Use Plan (PNL-6861) for semiannual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semiannually to establish priorities for energy-efficient testing applications using the MEL capabilities. The MEL Use Committee is composed of one representative each of the U.S. Department of Energy, U.S. Army, U.S. Air Force, U.S. Navy, and other Federal agencies.

  8. Mobile Energy Laboratory energy-efficiency testing programs

    SciTech Connect

    Parker, G.B.; Currie, J.W.

    1991-09-01

    This report summarizes energy-efficiency testing activities applying the Mobile Energy Laboratory (MEL) testing capabilities during the first and second quarters of fiscal year (FY) 1991. The MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) and the Naval Energy and Environmental Support Activity (NEESA) for energy testing and energy conservation program support functions at federal facilities. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in Section 8 of the MEL Use Plan (PNL-6861) for semiannual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semiannually to establish priorities for energy-efficient testing applications using the MEL capabilities. The MEL Use Committee is composed of one representative each of the US Department of Energy, US Army, US Air Force, US Navy, and other federal agencies.

  9. Mobile Energy Laboratory energy-efficiency testing programs

    SciTech Connect

    Parker, G B; Currie, J W

    1992-03-01

    This report summarizes energy-efficiency testing activities applying the Mobile Energy Laboratory (MEL) testing capabilities during the third and fourth quarters of fiscal year (FY) 1991. The MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) and the Naval Energy and Environmental Support Activity (NEESA) for energy testing and energy conservation program support functions at federal facilities. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in Section 8 of the MEL Use Plan (PNL-6861) for semi-annual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semi-annually to establish priorities for energy-efficient testing applications using the MEL capabilities. The MEL Use Committee is composed of one representative each of the US Department of Energy, US Army, US Air Force, US Navy, and other federal agencies.

  10. The Lincoln Laboratory-Aerospace Medical Research Laboratory digital speech test facility

    NASA Astrophysics Data System (ADS)

    Tierney, J.; Schecter, H.

    1984-05-01

    A narrowband digital speech communication test facility has been established and operates between Lincoln Laboratory and the Wright-Patterson Aerospace Medical Research Laboratory. Noise fields simulating the acoustic environments of E3A and F-15 aircraft are established and Air Force personnel use the link operating at 2400 bps with a vocoder designed at Lincoln Laboratory, and a commercial telephone line modem. The facility includes a digital signal processing computer which can introduce bit errors and delay into the transmit and receive data. Communication scenarios are used to exercise the vocoder-modem channel with the dynamics and vocabulary of typical operational exchanges. Answers to a standard questionnaire provide acceptability data for the 2400 bps JTIDS class 2 voice channel. For the tests run so far, the 2400 bps voice is acceptable in the sense of positive user response to the questionnaire. Further testing using error and delay simulations will follow. An F-15 to F-15 link will be simulated at AMRL using a pair of vocoders operating back-to-back and in separate noise chambers.

  11. LABORATORY EVALUATION OF THE DELTA Q TEST FOR DUCT LEAKAGE

    SciTech Connect

    ANDREWS,J.W.

    2003-05-01

    Using a residential-size duct system in a controlled laboratory setting, the repeatability and accuracy of the Delta Q test for air leakage in residential duct systems have been measured. More than 100 Delta Q tests were performed. These were compared with results using fan pressurization and also with results of a procedure (Delta Q Plus) that uses leakage hole-size information to select the leakage pressures to be used in the Delta Q algorithm. The average error in supply or return leakage for the fan-pressurization test was 6.4% of system fan flow. For the Delta Q test it was 3.4% of fan flow, while for Delta Q Plus it was 1.9% of fan flow.

  12. Exposure assessment of diesel bus emissions.

    PubMed

    Yip, Maricela; Madl, Pierre; Wiegand, Aaron; Hofmann, Werner

    2006-12-01

    The goal of this study was to measure ultrafine particle concentrations with diameters less than 1 mum emitted by diesel buses and to assess resulting human exposure levels. The study was conducted at the Woolloongabba Busway station in Brisbane, Australia in the winter months of 2002 during which temperature inversions frequently occurred. Most buses that utilize the station are fuelled by diesel, the exhaust of which contains a significant quantity of particle matter. Passengers waiting at the station are exposed to these particles emitted from the buses. During the course of this study, passenger census was conducted, based on video surveillance, yielding person-by-person waiting time data. Furthermore, a bus census revealed accurate information about the total number of diesel versus Compressed Natural Gas (CNG) powered buses. Background (outside of the bus station) and platform measurements of ultrafine particulate number size distributions were made to determine ambient aerosol concentrations. Particle number exposure concentration ranges from 10 and 40 to 60% of bus related exhaust fumes. This changes dramatically when considering the particle mass exposure concentration, where most passengers are exposed to about 50 to 80% of exhaust fumes. The obtained data can be very significant for comparison with similar work of this type because it is shown in previous studies that exhaust emissions causes cancer in laboratory animals. It was assumed that significant differences between platform and background distributions were due to bus emissions which, combined with passenger waiting times, yielded an estimate of passenger exposure to ultrafine particles from diesel buses. From an exposure point of view, the Busway station analyzed resembles a street canyon. Although the detected exhaust particle concentration at the outbound platform is found to be in the picogram range, exposure increases with the time passengers spend on the platform along with their breathing

  13. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Third Results Reports

    SciTech Connect

    Eudy, L.; Chandler, K.

    2012-05-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. NREL has previously published two reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from July 2011 through January 2012.

  14. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report

    SciTech Connect

    Eudy, L.; Chandler, K.

    2013-01-01

    SunLine Transit Agency, which provides public transit services to the Coachella Valley area of California, has demonstrated hydrogen and fuel cell bus technologies for more than 10 years. In May 2010, SunLine began demonstrating the advanced technology (AT) fuel cell bus with a hybrid electric propulsion system, fuel cell power system, and lithium-based hybrid batteries. This report describes operations at SunLine for the AT fuel cell bus and five compressed natural gas buses. The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) is working with SunLine to evaluate the bus in real-world service to document the results and help determine the progress toward technology readiness. NREL has previously published three reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from February 2012 through November 2012.

  15. Small Explorer Data System MIL-STD-1773 fiber optic bus

    NASA Technical Reports Server (NTRS)

    Flanegan, Mark; Label, Ken

    1992-01-01

    The MIL-STD-1773 Fiber Optic Data Bus as implemented in the GSFC Small Explorer Data System (SEDS) for the Small Explorer Program is described. It provides an overview of the SEDS MIL-STD-1773 bus components system design considerations, reliability figures, acceptance and qualification testing requirements, radiation requirements and tests, error handling considerations, and component heritage. The first mission using the bus will be launched in June of 1992.

  16. Shield evaluation and performance testing at the USMB`s Strategic Structures Testing Laboratory

    SciTech Connect

    Barczak, T.M.; Gearhart, D.F.

    1996-12-31

    Historically, shield performance testing is conducted by the support manufacturers at European facilities. The U.S. Bureau of Mines (USBM) has conducted extensive research in shield Mechanics and is now opening its Strategic Structures Testing (SST) Laboratory to the mining industry for shield performance testing. The SST Laboratory provides unique shield testing capabilities using the Mine Roof Simulator (MRS) load frame. The MRS provides realistic and cost-effective shield evaluation by combining both vertical and horizontal loading into a single load cycle; whereas, several load cycles would be required to obtain this loading in a static frame. In addition to these advantages, the USBM acts as an independent research organization to provide an unbiased assessment of shield performance. This paper describes the USBM`s shield testing program that is designed specifically to simulate in-service mining conditions using the unique the capabilities of the SST Laboratory.

  17. Available Alternative Fuel School Bus Products--2004

    SciTech Connect

    Not Available

    2004-04-01

    This 4-page Clean Cities fact sheet provides a list of the currently available (and soon to be available) model year 2004 alternative fuel school bus and school bus engine products. It includes information from Blue Bird Corporation, Collins Bus Corporation, Corbeil Bus, Ford Motor Company, General Motors Corporation, Thomas Built Buses, Inc., Clean Air Partners, Cummins Westport, and Deere & Company.

  18. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    SciTech Connect

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  19. Study on USB Based CAN Bus for Data Measurement System

    NASA Astrophysics Data System (ADS)

    Wu, Weibin; Hong, Tiansheng; Zhu, Yuqing; He, Guangbin; Ye, Cheng; Li, Haobiao; Chen, Chuwen

    Control area network (CAN) is an international protocol of field bus and universal serial bus (USB) is developing more and more widely. On the other hand, the USB technology combined with the CAN application is still in the development stage, so this research has broad prospects. The USB-based CAN bus system hardware consists of a CAN module, a USB communication module and a micro controller. It has been designed for real-time display and can save the CAN bus message. In addition it has been debugged in actual measurement accompanied by the Kvaser USB CAN II. The test results show that the system can correctly receive all messages frame from Kvaser CanKing. Finally the system has been applied to the project of citrus orchard for transmission of data of the citrus and tree parameters.

  20. Tested method to minimize plutonium assay discrepancies between laboratories

    SciTech Connect

    Seiler, R.J.; Goss, R.L.; Rodenburg, W.W.; Rogers, D.R.

    1982-01-29

    Plutonium assay differences are frequently observed between laboratories exchanging plutonium dioxide powders. These differences are commonly the result of chemical changes and/or nonhomogeneities in sampled materials. The irregularities are often caused by moisture absorption during sampling, packaging, shipment, and storage of the materials. A method is proposed which eliminates the effects of chemical change in samples, particularly moisture absorption, and minimizes sampling error. A nondestructive thermal watts/gram test on every preweighed sampled and total dissolution of these samples for chemical assay are the primary features which make this method effective. Because this method minimizes the error related to exchange material, it is possible to design an interlaboratory exchange program which demonstrates the assay capabiliies of the participants. In an experiment performed to demonstrate the effectiveness of this method, three PuO/sub 2/ batches of varying isotopic composition were synthesized at Mound to be used in the exchange tess. Powder sample aliquots from each batch were weighed directly into their vials under controlled atmospheric conditions. Calorimetric heat measurements were made on each vial to test homogeneity and verify sample weight. Six vials of each batch were chemically assayed at Mound and six at NBL (New Brunswick Laboratory). Both laboratories chose controlled-potential coulometry as the chemical assay technique because of its demonstrated precision and accuracy. Total dissolution of preweighed exchange samples eliminated the need for laborious and usually futile heating to return the material to its original condition. The mean chemical assay values obtained by Mound and NBL agree to within 0.01% for each of the compositions tested. Testing of both chemical assay and calorimetric data revealed no sampling error throughout the experiment.

  1. Occupant Kinematics in Laboratory Rollover Tests: PMHS Response.

    PubMed

    Lessley, David J; Riley, Patrick; Zhang, Qi; Foltz, Patrick; Overby, Brian; Heltzel, Sara; Sochor, Mark; Crandall, Jeff; Kerrigan, Jason R

    2014-11-01

    The objective of the current study was to characterize the whole-body kinematic response of restrained PMHS in controlled laboratory rollover tests. A dynamic rollover test system (DRoTS) and a parametric vehicle buck were used to conduct 36 rollover tests on four adult male PMHS with varied test conditions to study occupant kinematics during the rollover event. The DRoTS was used to drop/catch and rotate the test buck, which replicated the occupant compartment of a typical mid-sized SUV, around its center of gravity without roof-to-ground contact. The studied test conditions included a quasi-static inversion (4 tests), an inverted drop and catch that produced a 3 g vertical deceleration (4 tests), a pure dynamic roll at 360 degrees/second (11 tests), and a roll with a superimposed drop and catch produced vertical deceleration (17 tests). Each PMHS was restrained with a three-point belt and was tested in both leading-side and trailing-side front-row seating positions. Whole-body kinematics were measured using a 3D motion capture system that quantified occupant displacement relative to the vehicle buck for the X-axis (longitudinal), Y-axis (lateral), and Z-axis (vertical) directions. Additionally the spine was divided into five segments to describe intrasegmental kinematics of the spine, including segment rotations as well as spinal extension and compression. The reported data represent the most complete set of kinematic response targets for a restrained occupant in a variety of dynamic rollover conditions, and are immediately useful for efforts to evaluate and improve existing ATDs and computational models for use in the rollover crash environment. PMID:26192958

  2. Technical baseline description for in situ vitrification laboratory test equipment

    SciTech Connect

    Beard, K.V.; Bonnenberg, R.W.; Watson, L.R.

    1991-09-01

    IN situ vitrification (ISV) has been identified as possible waste treatment technology. ISV was developed by Pacific Northwest Laboratory (PNL), Richland, Washington, as a thermal treatment process to treat contaminated soils in place. The process, which electrically melts and dissolves soils and associated inorganic materials, simultaneously destroys and/or removes organic contaminants while incorporating inorganic contaminants into a stable, glass-like residual product. This Technical Baseline Description has been prepared to provide high level descriptions of the design of the Laboratory Test model, including all design modifications and safety improvements made to data. Furthermore, the Technical Baseline Description provides a basic overview of the interface documents for configuration management, program management interfaces, safety, quality, and security requirements. 8 figs.

  3. Issues in mapping LOINC laboratory tests to SNOMED CT.

    PubMed

    Bodenreider, Olivier

    2008-01-01

    Comprehensive clinical terminologies such as SNOMED CT tend to overlap with specialized terminologies such as LOINC (e.g., for the domain of laboratory procedures). Terminological systems such as the UMLS are often used to bridge between terminologies. However, the integration of LOINC in the UMLS and with other terminologies remains suboptimal. We mapped concepts for laboratory tests from LOINC to pre-coordinated SNOMED CT concepts, based on shared relations to other concepts. As LOINC is finer-grained than SNOMED CT, several LOINC codes tend to map to the same SNOMED CT concept. However, a large proportion of LOINC codes could not be mapped to SNOMED CT through this approach, because of underspecified definitions in SNOMED CT and a lack of fine-grained, pre-coordinated concepts in SNOMED CT. PMID:18999311

  4. Laboratory Performance Testing of Residential Window Air Conditioners

    SciTech Connect

    Winkler, J.; Booten, C.; Christensen, D.; Tomerlin, J.

    2013-03-01

    Window air conditioners are the dominant cooling product for residences, in terms of annual unit sales. They are inexpensive, portable and can be installed by the owner. For this reason, they are an attractive solution for supplemental cooling, for retrofitting air conditioning into a home which lacks ductwork, and for renters. Window air conditioners for sale in the United States are required to meet very modest minimum efficiency standards. Four window air conditioners' performance were tested in the Advanced HVAC Systems Laboratory on NREL's campus in Golden, CO. In order to separate and study the refrigerant system's performance, the unit's internal leakage pathways, the unit's fanforced ventilation, and the leakage around the unit resulting from installation in a window, a series of tests were devised that focused on each aspect of the unit's performance. These tests were designed to develop a detailed performance map to determine whole-house performance in different climates. Even though the test regimen deviated thoroughly from the industry-standard ratings test, the results permit simple calculation of an estimated rating for both capacity and efficiency that would result from a standard ratings test. Using this calculation method, it was found that the three new air conditioners' measured performance was consistent with their ratings. This method also permits calculation of equivalent SEER for the test articles. Performance datasets were developed across a broad range of indoor and outdoor operating conditions, and used them to generate performance maps.

  5. What is needed on a laboratory test request form?

    PubMed

    Hopwood, J; Gleave, T; Mallinson, H

    2002-03-01

    In the development of a screening programme for genital tract Chlamydia trachomatis infection, a modified test request form was devised and used successfully both to request the test, to collect data and to inform patients. Our examination of the practicalities and ethical and confidentiality issues involved in making a request for a laboratory test to assist clinical diagnosis or management, resulted in the introduction of extra features that we had not previously seen used in the design of request forms. Coded response boxes can have adjacent questions attached as a perforated strip. Removal of this question strip leaves a completed form with no explicit sensitive data (figure 2). A detachable information sheet for patients can also be incorporated into the request form (figure 1). The design of a request form raises issues that do not appear to have been widely or formally debated. PMID:12070975

  6. Managing Your District's Bus Contractor.

    ERIC Educational Resources Information Center

    Walsh, Mark A.

    2002-01-01

    Describes the essential elements of a student bus transportation contract with a private transportation service company such as reporting requirements, problem-solving procedures, and performance penalties and incentives. (PKP)

  7. SCHOOL BUS GARAGES, 1966 REVISION.

    ERIC Educational Resources Information Center

    JOHNSON, HERBERT F.

    STANDARDS AND RECOMMENDATIONS ARE GIVEN FOR THE DESIGN AND CONSTRUCTION OF SCHOOL BUS GARAGES INCLUDING BRIEF DISCUSSIONS OF--(1) SITE DEVELOPMENT, (2) DESIGN AND CONSTRUCTION, AND (3) MECHANICAL (HEATING, PLUMBING, AND VENTILATION) AND ELECTRICAL FACTORS. (JT)

  8. Digital Audio Radio Broadcast Systems Laboratory Testing Nearly Complete

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Radio history continues to be made at the NASA Lewis Research Center with the completion of phase one of the digital audio radio (DAR) testing conducted by the Consumer Electronics Group of the Electronic Industries Association. This satellite, satellite/terrestrial, and terrestrial digital technology will open up new audio broadcasting opportunities both domestically and worldwide. It will significantly improve the current quality of amplitude-modulated/frequency-modulated (AM/FM) radio with a new digitally modulated radio signal and will introduce true compact-disc-quality (CD-quality) sound for the first time. Lewis is hosting the laboratory testing of seven proposed digital audio radio systems and modes. Two of the proposed systems operate in two modes each, making a total of nine systems being tested. The nine systems are divided into the following types of transmission: in-band on-channel (IBOC), in-band adjacent-channel (IBAC), and new bands. The laboratory testing was conducted by the Consumer Electronics Group of the Electronic Industries Association. Subjective assessments of the audio recordings for each of the nine systems was conducted by the Communications Research Center in Ottawa, Canada, under contract to the Electronic Industries Association. The Communications Research Center has the only CCIR-qualified (Consultative Committee for International Radio) audio testing facility in North America. The main goals of the U.S. testing process are to (1) provide technical data to the Federal Communication Commission (FCC) so that it can establish a standard for digital audio receivers and transmitters and (2) provide the receiver and transmitter industries with the proper standards upon which to build their equipment. In addition, the data will be forwarded to the International Telecommunications Union to help in the establishment of international standards for digital audio receivers and transmitters, thus allowing U.S. manufacturers to compete in the

  9. Development and validation of a self-report measure of bus driver behaviour.

    PubMed

    Dorn, Lisa; Stephen, Lucy; af Wåhlberg, Anders; Gandolfi, Julie

    2010-12-01

    There are likely to be individual differences in bus driver behaviour when adhering to strict schedules under time pressure. A reliable and valid assessment of these individual differences would be useful for bus companies keen to mitigate risk of crash involvement. This paper reports on three studies to develop and validate a self-report measure of bus driver behaviour. For study 1, two principal components analyses of a pilot questionnaire revealed six components describing bus driver behaviour and four bus driver coping components. In study 2, test-retest reliability of the components were tested in a sub-sample and found to be adequate. Further, the 10 components were used to predict bus crash involvement at three levels of culpability with consistently significant associations found for two components. For study 3, avoidance coping was consistently associated with celeration variables in a bus simulator, especially for a time-pressured drive. STATEMENT OF RELEVANCE: The instrument can be used by bus companies for driver stress and fatigue management training to identify at-risk bus driver behaviour. Training to reduce the tendency to engage in avoidance coping strategies, improve evaluative coping strategies and hazard monitoring when under stress may improve bus driver safety. PMID:21108079

  10. Prototype dish testing and analysis at Sandia National Laboratories

    SciTech Connect

    Grossman, J.W.; Houser, R.M.; Erdman, W.W.

    1991-01-01

    During the past year, Sandia National Laboratories performed on-sun testing of several dish concentrator concepts. These tests were undertaken at the National Solar Thermal Test Facility (NSTTF). Two of the tests were performed in support of the DOE Concentrator Receiver Development Program. The first was on-sun testing of the single-element stretched-membrane dish; this 7-meter diameter dish uses a single preformed metal membrane with an aluminized polyester optical surface and shows potential for future dish-Stirling systems. The next involved two prototype facets from the Faceted Stretched-Membrane Dish Program. These facets, representing competitive design concepts, are closest to commercialization. Five 1-meter triangular facets were tested on-sun as part of the development program for a solar dynamic system on Space Station Freedom. While unique in character, all the tests utilized the Beam Characterization System (BCS) as the main measurement tool and all were analyzed using the Sandia-developed CIRCE2 computer code. The BCS is used to capture and digitize an image of the reflected concentrator beam that is incident on a target surface. The CIRCE2 program provides a computational tool, which when given the geometry of the concentrator and target as well as other design parameters will predict the flux distribution of the reflected beam. One of these parameters, slope error, is the variable that has a major effect in determining the quality of the reflected beam. The methodology used to combine these two tools to predict uniform slope errors for the dishes is discussed in this document. As the Concentrator Development Programs continue, Sandia will test and evaluate two prototype dish systems. The first, the faceted stretched-membrane dish, is expected to be tested in 1992, followed by the full-scale single-element stretched-membrane dish in 1993. These tests will use the tools and methodology discussed in this document. 14 refs., 10 figs., 5 tabs.

  11. 42 CFR 493.25 - Laboratories performing tests of high complexity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Laboratories performing tests of high complexity....25 Laboratories performing tests of high complexity. (a) A laboratory must obtain a certificate for tests of high complexity if it performs one or more tests that meet the criteria for tests of...

  12. TRITIUM LABORATORY, TRA666, INTERIOR. DETAIL OF TEST LOOP PIPING. INL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TRITIUM LABORATORY, TRA-666, INTERIOR. DETAIL OF TEST LOOP PIPING. INL NEGATIVE NO. HD30-1-3. Mike Crane, Photographer, 6/2001 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  13. ALASCA proficiency testing scheme for occupational hygiene laboratories.

    PubMed

    Langlois, Eddy; Boulet, Alain; Kauffer, Edmond

    2008-12-01

    Nowadays, quality assurance is an important part in the environment of analytical laboratories, who need to prove their ability to perform analysis as well to handle routine control as research and development analysis. A proficiency testing scheme (PTS) is one of the possible and powerful tools to evaluate both bias and dispersion of the analysis. As far as industrial hygiene is concerned, since analytical uncertainty is insignificant with regard to sampling strategy uncertainty, laboratories could be tempted to neglect analytical uncertainty assessment as well. The department 'Métrologie des Polluants' (part of INRS) has been organising a proficiency testing scheme since 2002 with the intention of giving the most reliable performance assessment to the participant. The original features, which are also the strong points of the scheme, are: the determination of the assigned value by a method that is independent from the analytical method to be tested; the development of original tools for the fabrication of samples; the strength of the statistic model, which is based on the WASP HSL scheme model; a tool to visualize the results of participants in bias and dispersion contribution; communication with the participants; a completely computerized system to handle the participant database, the sample database, results treatment and report edition; and the use of internet facilities to allow the participant to submit the results via a secured website. All these technical and organisational points are detailed in this paper. PMID:19037488

  14. 42 CFR 493.1459 - Condition: Laboratories performing high complexity testing; general supervisor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing high complexity... REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1459 Condition: Laboratories performing high complexity testing; general supervisor. The laboratory must have...

  15. 42 CFR 493.1467 - Condition: Laboratories performing high complexity testing; cytology general supervisor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing high complexity... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1467 Condition: Laboratories performing high complexity testing; cytology general supervisor. For...

  16. 42 CFR 493.1447 - Condition: Laboratories performing high complexity testing; technical supervisor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing high complexity... REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1447 Condition: Laboratories performing high complexity testing; technical supervisor. The laboratory must have...

  17. 42 CFR 414.508 - Payment for a new clinical diagnostic laboratory test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Payment for a new clinical diagnostic laboratory... HEALTH SERVICES Payment for New Clinical Diagnostic Laboratory Tests § 414.508 Payment for a new clinical diagnostic laboratory test. For a new clinical diagnostic laboratory test that is assigned a new...

  18. 42 CFR 414.508 - Payment for a new clinical diagnostic laboratory test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Payment for a new clinical diagnostic laboratory... SERVICES Payment for New Clinical Diagnostic Laboratory Tests § 414.508 Payment for a new clinical diagnostic laboratory test. For a new clinical diagnostic laboratory test that is assigned a new...

  19. 42 CFR 414.508 - Payment for a new clinical diagnostic laboratory test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Payment for a new clinical diagnostic laboratory... HEALTH SERVICES Payment for New Clinical Diagnostic Laboratory Tests § 414.508 Payment for a new clinical diagnostic laboratory test. For a new clinical diagnostic laboratory test that is assigned a new...

  20. 42 CFR 414.508 - Payment for a new clinical diagnostic laboratory test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Payment for a new clinical diagnostic laboratory... HEALTH SERVICES Payment for New Clinical Diagnostic Laboratory Tests § 414.508 Payment for a new clinical diagnostic laboratory test. For a new clinical diagnostic laboratory test that is assigned a new...

  1. 42 CFR 414.508 - Payment for a new clinical diagnostic laboratory test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Payment for a new clinical diagnostic laboratory... SERVICES Payment for New Clinical Diagnostic Laboratory Tests § 414.508 Payment for a new clinical diagnostic laboratory test. For a new clinical diagnostic laboratory test that is assigned a new...

  2. Electric vehicle battery testing and development at Argonne National Laboratory

    SciTech Connect

    Smaga, J.A.; Gillie, K.R.; Webster, C.E.; Tummillo, A.F.; Kulaga, J.K.; Marr, J.J. )

    1992-12-01

    The Electric Vehicle Battery Testing and Development Project for the Electric Power Research Institute (EPRI) does selected electric vehicle (EV) battery performance evaluations and special application tests in support of the EPRI Electric Transportation Program. Overall, this program provides information to aid the design and development of improved components and systems for electric vehicles. The Electrochemical Technology Department in the Chemical Technology Division of the Argonne National Laboratory (ANL) manages the project under the sponsorship and direction of the EPRI Electric Transportation Program. This report summarizes the work in this program from January through December 1991. Technical tasks and activities encompassed battery testing, post-test teardown analyses and special technology/application-related studies. Battery testing activities included evaluation of nickel/iron, lead-acid, nickel/cadmium, and nickel/metal-hydride EV battery technologies. Post-test analyses examined 6Vl60 and 3ET205 lead-acid cells. Special studies/analyses were conducted to examine Ni/Fe battery outgas composition and electrolyte variations, the self-discharge loss of nickel/metal-hydride cells, the effects of partial discharge operation on the available energy of Ni/Cd modules, and the effect of charge method/return/pulse-currents on Ni/Fe battery performance.

  3. Clinical and Laboratory Testing for Trichomonas vaginalis Infection

    PubMed Central

    2015-01-01

    Trichomonas vaginalis infection is highly prevalent in the United States and worldwide. Traditional clinical diagnostic methods fail to identify more than half of these infections that, if left untreated, can result in adverse pregnancy outcomes and an exacerbated risk of both acquisition and transmission of HIV. Women bear a disproportionate amount of the burden of these infections, and testing among populations at risk for this disease should be provided. Molecular technologies have expanded our capacity for laboratory-based detection of infection and can be used on samples already being collected for chlamydia/gonorrhea screening. PMID:26491181

  4. Retrofitting Combined Space and Water Heating Systems. Laboratory Tests

    SciTech Connect

    Schoenbauer, B.; Bohac, D.; Huelman, P.; Olsen, R.; Hewett, M.

    2012-10-01

    Better insulated and tighter homes can often use a single heating plant for both space and domestic water heating. These systems, called dual integrated appliances (DIA) or combination systems, can operate at high efficiency and eliminate combustion safety issues associated by using a condensing, sealed combustion heating plant. Funds were received to install 400 DIAs in Minnesota low-income homes. The NorthernSTAR DIA laboratory was created to identify proper system components, designs, operating parameters, and installation procedures to assure high efficiency of field installed systems. Tests verified that heating loads up to 57,000 Btu/hr can be achieved with acceptable return water temperatures and supply air temperatures.

  5. Retrofitting Combined Space and Water Heating Systems: Laboratory Tests

    SciTech Connect

    Schoenbauer, B.; Bohac, D.; Huelman, P.; Olson, R.; Hewitt, M.

    2012-10-01

    Better insulated and tighter homes can often use a single heating plant for both space and domestic water heating. These systems, called dual integrated appliances (DIA) or combination systems, can operate at high efficiency and eliminate combustion safety issues associated by using a condensing, sealed combustion heating plant. Funds were received to install 400 DIAs in Minnesota low-income homes. The NorthernSTAR DIA laboratory was created to identify proper system components, designs, operating parameters, and installation procedures to assure high efficiency of field installed systems. Tests verified that heating loads up to 57,000 Btu/hr can be achieved with acceptable return water temperatures and supply air temperatures.

  6. Laser-trapped mirrors in space: steps toward laboratory testing

    NASA Astrophysics Data System (ADS)

    Labeyrie, Antoine; Fournier, Jean-Marc R.; Stachnik, Robert V.

    2004-10-01

    The prospect of large astronomical mirrors in space, made of a thin trapped membrane or a mono-layer of sub-micron particles, raises appreciable theoretical and technological problems at the frontiers of physics, chemistry and materials science. We explore various approaches towards testing different materials in the laboratory at temperatures matching those of a sun-shielded structure in interplanetary space (80- 100 K). Trap loading and damping are among the issues considered, as well as the pumping of particles towards a central fringe, using polychromatic light.

  7. Ring Buffered Network Bus

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This report describes the research effort to demonstrate the integration of a data sharing technology, Ring Buffered Network Bus, in development by Dryden Flight Research Center, with an engine simulation application, the Java Gas Turbine Simulator, in development at the University of Toledo under a grant from the Glenn Research Center. The objective of this task was to examine the application of the RBNB technologies as a key component in the data sharing, health monitoring and system wide modeling elements of the NASA Aviation Safety Program (AVSP) [Golding, 1997]. System-wide monitoring and modeling of aircraft and air safety systems will require access to all data sources which are relative factors when monitoring or modeling the national airspace such as radar, weather, aircraft performance, engine performance, schedule and planning, airport configuration, flight operations, etc. The data sharing portion of the overall AVSP program is responsible for providing the hardware and software architecture to access and distribute data, including real-time flight operations data, among all of the AVSP elements. The integration of an engine code capable of numerically "flying" through recorded flight paths and weather data using a software tool that allows for distributed access of data to this engine code demonstrates initial steps toward building a system capable of monitoring and modeling the National Airspace.

  8. Laboratory test data on the stability of the STIS MAMAs

    NASA Technical Reports Server (NTRS)

    Joseph, Charles L.

    1997-01-01

    STIS has two MAMA detectors systems with distinctly different tube configurations. The first (designated BAND 1) has an opaque CsI photocathode deposited on the microchannel plate (MCP) providing wavelength coverage from 1150A to 1700A. The other MAMA (designated BAND 2) has a semitransparent CS2Te photocathode deposited on the faceplate in close proximity to the input of the MCP. It covers the 1650A to 3100A bandpass and serves as a backup for the short wavelength detector. Laboratory test data indicate that both of these detectors have good sensitivity, have good uniformity and provide stable response, making each capable of collecting data with a signal-to-noise ratio in excess of 100 per Space Telescope Imaging Spectrograph (STIS) optical resolution element. Over a multiyear development effort, a substantial body of laboratory test data (more than 6 GBytes spanning more than 6 years of collection) has accumulated on more than a dozen fabricated tubes. These tests even included a few destructive evaluations to examine the limitations and operating life. In addition, analyses where conducted regarding impact caused by the specified electronic tolerances and expected changes in the Hubble Space Telescope (HST) thermal environment. Perhaps the simplest test of stability is to collect a sequence of images, each with a uniform illumination, and use these individual "flat fields" to remove the pixel-to-pixel sensitivity in the other flat fields. These sequences typically spanned 3-5 weeks of time. The detectors are very stable, allowing the pixel-to-pixel sensitivity to be removed with good precision. The STIS specification for stability is 1% (sufficient for data with a S/N = 100) over a 1 week period and 2% over 30 days. All Engineering Model Units as well as Flight Detectors tested exceeded this specification.

  9. Laboratory Testing of Waste Isolation Pilot Plant Surrogate Waste Materials

    NASA Astrophysics Data System (ADS)

    Broome, S.; Bronowski, D.; Pfeifle, T.; Herrick, C. G.

    2011-12-01

    The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy geological repository for the permanent disposal of defense-related transuranic (TRU) waste. The waste is emplaced in rooms excavated in the bedded Salado salt formation at a depth of 655 m below the ground surface. After emplacement of the waste, the repository will be sealed and decommissioned. WIPP Performance Assessment modeling of the underground material response requires a full and accurate understanding of coupled mechanical, hydrological, and geochemical processes and how they evolve with time. This study was part of a broader test program focused on room closure, specifically the compaction behavior of waste and the constitutive relations to model this behavior. The goal of this study was to develop an improved waste constitutive model. The model parameters are developed based on a well designed set of test data. The constitutive model will then be used to realistically model evolution of the underground and to better understand the impacts on repository performance. The present study results are focused on laboratory testing of surrogate waste materials. The surrogate wastes correspond to a conservative estimate of the degraded containers and TRU waste materials after the 10,000 year regulatory period. Testing consists of hydrostatic, uniaxial, and triaxial tests performed on surrogate waste recipes that were previously developed by Hansen et al. (1997). These recipes can be divided into materials that simulate 50% and 100% degraded waste by weight. The percent degradation indicates the anticipated amount of iron corrosion, as well as the decomposition of cellulosics, plastics, and rubbers. Axial, lateral, and volumetric strain and axial and lateral stress measurements were made. Two unique testing techniques were developed during the course of the experimental program. The first involves the use of dilatometry to measure sample volumetric strain under a hydrostatic condition. Bulk

  10. 42 CFR 410.32 - Diagnostic x-ray tests, diagnostic laboratory tests, and other diagnostic tests: Conditions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 2 2011-10-01 2011-10-01 false Diagnostic x-ray tests, diagnostic laboratory tests, and other diagnostic tests: Conditions. 410.32 Section 410.32 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICARE PROGRAM SUPPLEMENTARY MEDICAL INSURANCE (SMI) BENEFITS Medical and Other...

  11. 42 CFR 410.32 - Diagnostic x-ray tests, diagnostic laboratory tests, and other diagnostic tests: Conditions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Service Act, as implemented by 21 CFR part 900, subpart B. (d) Diagnostic laboratory tests—(1) Who may... required throughout the performance of the test. (i) General supervision means the procedure is furnished... material relevant to the medical necessity of the specific test(s), taking into consideration current...

  12. 42 CFR 410.32 - Diagnostic x-ray tests, diagnostic laboratory tests, and other diagnostic tests: Conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... implemented by 21 CFR part 900, subpart B. (d) Diagnostic laboratory tests—(1) Who may furnish services... performance of the test. (i) General supervision means the procedure is furnished under the physician's... necessity of the specific test(s), taking into consideration current rules and regulations on...

  13. New York State 2010 HIV testing law: an evaluation of testing rates using laboratory data.

    PubMed

    Lazariu, Victoria; Parker, Monica M; Leung, Shu-Yin J; McVoy, Matthew; Gieryic, Susan; Rowe, Kirsten A; Ortega-Peluso, Christina; Anderson, Bridget J; McNutt, Louise-Anne; Smith, Lou C

    2015-01-01

    As of September 2010, New York State (NYS) Public Health Law mandates the offer of HIV testing to all persons aged 13-64 years receiving hospital or primary care services. Changes in the number of HIV tests 13 months before and after law enactment were assessed using HIV test volume data from 166 laboratories holding NYS permits to conduct HIV testing on specimens originating in NYS. Compared with the pre-enactment baseline, overall HIV testing volume increased by 13% following enactment, with the volume of conventional and rapid HIV screening tests increasing by 12.0% and 13.7%, respectively. These data suggest that testing law is having an impact consistent with the legislative intent to increase HIV testing in NYS. Monitoring should be continued to assess testing trends across a variety of health care venues to identify and address additional barriers to HIV testing access. PMID:25545488

  14. SINGLE EVENT EFFECTS TEST FACILITY AT OAK RIDGE NATIONAL LABORATORY

    SciTech Connect

    Riemer, Bernie; Gallmeier, Franz X; Dominik, Laura J

    2015-01-01

    Increasing use of microelectronics of ever diminishing feature size in avionics systems has led to a growing Single Event Effects (SEE) susceptibility arising from the highly ionizing interactions of cosmic rays and solar particles. Single event effects caused by atmospheric radiation have been recognized in recent years as a design issue for avionics equipment and systems. To ensure a system meets all its safety and reliability requirements, SEE induced upsets and potential system failures need to be considered, including testing of the components and systems in a neutron beam. Testing of ICs and systems for use in radiation environments requires the utilization of highly advanced laboratory facilities that can run evaluations on microcircuits for the effects of radiation. This paper provides a background of the atmospheric radiation phenomenon and the resulting single event effects, including single event upset (SEU) and latch up conditions. A study investigating requirements for future single event effect irradiation test facilities and developing options at the Spallation Neutron Source (SNS) is summarized. The relatively new SNS with its 1.0 GeV proton beam, typical operation of 5000 h per year, expertise in spallation neutron sources, user program infrastructure, and decades of useful life ahead is well suited for hosting a world-class SEE test facility in North America. Emphasis was put on testing of large avionics systems while still providing tunable high flux irradiation conditions for component tests. Makers of ground-based systems would also be served well by these facilities. Three options are described; the most capable, flexible, and highest-test-capacity option is a new stand-alone target station using about one kW of proton beam power on a gas-cooled tungsten target, with dual test enclosures. Less expensive options are also described.

  15. A simple measuring device for laboratory indentation tests on cartilage.

    PubMed

    Koeller, Wolfgang; Kunow, Julius; Ostermeyer, Oliver; Stomberg, Peter; Boos, Carsten; Russlies, Martin

    2008-04-01

    Mechanical testing of articular cartilage and repair tissue enables judgment of their capacity in withstanding mechanical loading. In the past, different methods have been developed requiring a complex technical setup and extensive data analysis. Therefore, the aim of the present project was to build up a simple measuring apparatus for laboratory indentation tests. The device consists of an incremental optical displacement transducer with a sleeve bearing guided plunger and a spherical tip made of polished steel (radius: 0.75 or 1.5 mm), a sensitive load cell and a stiff frame. The indentation force results from the plunger's gravity plus the force of the spring inside the displacement transducer and levels at 0.170 N or 0.765 N. The displacement transducer is fixed to the frame via the load cell that enables one to detect the initial contact of the tip with the tissue. The load cell has a standard uncertainty of 2 mN and the displacement transducer of 1 microm. From indentation-creep tests, a "0.25-s elastic modulus" is calculated. Measurements on thin rubber sheets were carried out to determine the quality of the measuring device. Compression tests on cylinders made of these rubber sheets yielded control data, and a good agreement with the "0.25-s elastic modulus" was found. Indentation tests on cartilage at different sites of sheep femoral condyles yielded a very good repeatability of the measurement results (+/-7.5%). PMID:18979621

  16. Experimental laboratory system to generate high frequency test environments

    SciTech Connect

    Gregory, D.L.; Paez, T.L.

    1991-01-01

    This is an extension of two previous analytical studies to investigate a technique for generating high frequency, high amplitude vibration environments. These environments are created using a device attached to a common vibration exciter that permits multiple metal on metal impacts driving a test surface. These analytical studies predicted that test environments with an energy content exceeding 10 kHz could be achieved using sinusoidal and random shaker excitations. The analysis predicted that chaotic vibrations yielding random like test environments could be generated from sinusoidal inputs. In this study, a much simplified version of the proposed system was fabricated and tested in the laboratory. Experimental measurements demonstrate that even this simplified system, utilizing a single impacting object, can generate environments on the test surface with significant frequency content in excess of 40 kHz. Results for sinusoidal shaker inputs tuned to create chaotic impact response are shown along with the responses due to random vibration shaker inputs. The experiments and results are discussed. 4 refs., 5 figs.

  17. Laboratory and field testing of improved geothermal rock bits

    SciTech Connect

    Hendrickson, R.R.; Jones, A.H.; Winzenried, R.W.; Maish, A.B.

    1980-07-01

    The development and testing of 222 mm (8-3/4 inch) unsealed, insert type, medium hard formation, high-temperature bits are described. The new bits were fabricated by substituting improved materials in critical bit components. These materials were selected on bases of their high temperature properties, machinability, and heat treatment response. Program objectives required that both machining and heat treating could be accomplished with existing rock bit production equipment. Two types of experimental bits were subjected to laboratory air drilling tests at 250/sup 0/C (482/sup 0/F) in cast iron. These tests indicated field testing could be conducted without danger to the hole, and that bearing wear would be substantially reduced. Six additional experimental bits, and eight conventional bits were then subjected to air drilling a 240/sup 0/C (464/sup 0/F) in Francisan Graywacke at The Geysers, CA. The materials selected improved roller wear by 200%, friction-pin wear by 150%, and lug wear by 150%. Geysers drilling performances compared directly to conventional bits indicate that in-gage drilling life was increased by 70%. All bits at The Geysers are subjected to reaming out-of-gage hole prior to drilling. Under these conditions the experimental bits showed a 30% increase in usable hole over the conventional bits. These tests demonstrated a potential well cost reduction of 4 to 8%. Savings of 12% are considered possible with drilling procedures optimized for the experimental bits.

  18. [Problem-solving in immunohematology: direct compatibility laboratory test ].

    PubMed

    Mannessier, L; Roubinet, F; Chiaroni, J

    2001-12-01

    Cross-matching between the serum of a patient and the red blood cells to be transfused is most important for the prevention of hemolytic transfusion reactions in allo-immunized or new-born patients found positive with direct antiglobulin test. Cross-matching is a time-consuming and complex laboratory test. In order to obtain valid results, it is necessary to abide by some technical rules detailed in this article. The choice of the blood units to be cross-matched depends on the patient's clinical story and on the specificity of anti-erythrocyte antibodies present in the serum. The identification and the management of most frequent difficulties met by using the cross-match technique are discussed hereby. PMID:11802611

  19. The laboratory station for tyres grip testing on different surfaces

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Grabowik, C.; Janik, W.; Ćwikła, G.; Skowera, M.

    2015-11-01

    The paper presents the conception of the device for tyre grip testing in the laboratory conditions. The main purpose is to provide a device working in confined spaces, which enables rapid changes of the tested samples of the road surfaces. Among the key assumptions the minimization of the device dimensions and the relative ease of transportation and mobility - the ability to quick assemble and disassemble were also assumed. The main components of the projected workstation includes: the replaceable platform for mounting samples of a road surface, the roller conveyor, the drive of the platform, the wheel mounting assembly and the axial force measuring system. At the design the station a morphological structure method has been used, particular elements have been optimized individually.

  20. Spacecraft design project multipurpose satellite bus MPS

    NASA Technical Reports Server (NTRS)

    Kellman, Lyle; Riley, John; Szostak, Michael; Watkins, Joseph; Willhelm, Joseph; Yale, Gary

    1990-01-01

    The thrust of this project was to design not a single spacecraft, but to design a multimission bus capable of supporting several current payloads and unnamed, unspecified future payloads. Spiraling costs of spacecraft and shrinking defense budgets necessitated a fresh look at the feasibility of a multimission spacecraft bus. The design team chose two very diverse and different payloads, and along with them two vastly different orbits, to show that multimission spacecraft buses are an area where indeed more research and effort needs to be made. Tradeoffs, of course, were made throughout the design, but optimization of subsystem components limited weight and volume penalties, performance degradation, and reliability concerns. Simplicity was chosen over more complex, sophisticated and usually more efficient designs. Cost of individual subsystem components was not a primary concern in the design phase, but every effort was made to chose flight tested and flight proven hardware. Significant cost savings could be realized if a standard spacecraft bus was indeed designed and purchased in finite quantities.

  1. Design and laboratory testing of a prototype linear temperature sensor

    NASA Astrophysics Data System (ADS)

    Dube, C. M.; Nielsen, C. M.

    1982-07-01

    This report discusses the basic theory, design, and laboratory testing of a prototype linear temperature sensor (or "line sensor'), which is an instrument for measuring internal waves in the ocean. The operating principle of the line sensor consists of measuring the average resistance change of a vertically suspended wire (or coil of wire) induced by the passage of an internal wave in a thermocline. The advantage of the line sensor over conventional internal wave measurement techniques is that it is insensitive to thermal finestructure which contaminates point sensor measurements, and its output is approximately linearly proportional to the internal wave displacement. An approximately one-half scale prototype line sensor module was teste in the laboratory. The line sensor signal was linearly related to the actual fluid displacement to within 10%. Furthermore, the absolute output was well predicted (within 25%) from the theoretical model and the sensor material properties alone. Comparisons of the line sensor and a point sensor in a wavefield with superimposed turbulence (finestructure) revealed negligible distortion in the line sensor signal, while the point sensor signal was swamped by "turbulent noise'. The effects of internal wave strain were also found to be negligible.

  2. Current issues of personnel and laboratory practices in genetic testing

    PubMed Central

    Mark, Hon Fong Louie; Kelly, Thaddeus; Watson, Michael S; Hoeltge, Gerald; Miller, Wayne A; Beauregard, Laurent

    1995-01-01

    As genetic testing is an area with implications extending far beyond that of the primary patient, it is appropriately an area that is under increased scrutiny. To ensure that high quality is maintained in the delivery of genetic services, several agencies have developed standards and guidelines. The present article summarises important recommendations made by the American College of Medical Genetics (ACMG), the College of American Pathologists (CAP), the US Health Care Financing Administration (HCFA), and the US Food and Drug Administration (FDA) as they relate to genetic testing. Some of the standards are based on voluntary compliance, whereas others have the force of regulation. They all address issues of personnel credentials, laboratory operations, and the most critical quality assurance and control measures for diagnostic laboratories from the perspective of various agencies. In most instances, the standards promulgated by these agencies are offered as minimum criteria. The exact impact of these regulations on the practice of medical genetics has yet to be established. Images PMID:8558555

  3. CONTROL TESTING OF THE UK NATIONAL NUCLEAR LABORATORY'S RADBALL TECHNOLOGY AT SAVANNAH RIVER NATIONAL LABORATORY

    SciTech Connect

    Farfan, E.

    2009-11-23

    The UK National Nuclear Laboratory (NNL) has developed a remote, non-electrical, radiation-mapping device known as RadBall (patent pending), which offers a means to locate and quantify radiation hazards and sources within contaminated areas of the nuclear industry. To date, the RadBall has been deployed in a number of technology trials in nuclear waste reprocessing plants at Sellafield in the UK. The trials have demonstrated the successful ability of the RadBall technology to be deployed and retrieved from active areas. The positive results from these initial deployment trials and the anticipated future potential of RadBall have led to the NNL partnering with the Savannah River National Laboratory (SRNL) to further underpin and strengthen the technical performance of the technology. RadBall consists of a colander-like outer shell that houses a radiation-sensitive polymer sphere. It has no power requirements and can be positioned in tight or hard-to reach places. The outer shell works to collimate radiation sources and those areas of the polymer sphere that are exposed react, becoming increasingly less transparent, in proportion to the absorbed dose. The polymer sphere is imaged in an optical-CT scanner which produces a high resolution 3D map of optical attenuation coefficients. Subsequent analysis of the optical attenuation maps provides information on the spatial distribution and strength of the sources in a given area forming a 3D characterization of the area of interest. This study completed at SRNL addresses key aspects of the testing of the RadBall technology. The first set of tests was performed at Savannah River Nuclear Solutions Health Physics Instrument Calibration Laboratory (HPICL) using various gamma-ray sources and an x-ray machine with known radiological characteristics. The objective of these preliminary tests was to identify the optimal dose and collimator thickness. The second set of tests involved a highly contaminated hot cell. The objective of

  4. Standard Hydrogen Test Protocols for the NREL Sensor Testing Laboratory (Brochure)

    SciTech Connect

    Not Available

    2011-12-01

    This brochure summarizes the test protocols used in the NREL Hydrogen Sensor Test Laboratory for the quantitative assessment of critical analytical performance specifications for hydrogen sensors. Researchers at the NREL Hydrogen Safety Sensor Test Laboratory developed a variety of test protocols to quantitatively assess critical analytical performance specifications for hydrogen sensors. Many are similar to, but typically more rigorous than, the test procedures mandated by ISO Standard 26142 (Hydrogen Detector for Stationary Applications). Specific protocols were developed for linear range, short-term stability, and the impact of fluctuations in temperature (T), pressure (P), relative humidity (RH), and chemical environment. Specialized tests (e.g., oxygen requirement) may also be performed. Hydrogen safety sensors selected for evaluation are subjected to a thorough regimen of test protocols, as described. Sensor testing is performed at NREL on custom-built sensor test fixtures. Environmental parameters such as T, P, RH, and gas composition are rigorously controlled and monitored. The NREL evaluations are performed on commercial hydrogen detectors, on emerging sensing technologies, and for end users to validate sensor performance for specific application needs. Test results and data are shared with the manufacturer or client via summary reports, teleconference phone calls, and, when appropriate, site visits to manufacturer facilities. Client representatives may also monitor NREL's operation while their technologies are being tested. Manufacturers may use test data to illustrate the analytical capability of their technologies and, more importantly, to guide future developments. NREL uses the data to assess technology gaps and deployment considerations. Per NREL Sensor Testing Laboratory policy, test results are treated as proprietary and are not shared with other manufacturers or other entities without permission. The data may be used by NREL in open publications

  5. 49 CFR 40.91 - What validity tests must laboratories conduct on primary specimens?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false What validity tests must laboratories conduct on primary specimens? 40.91 Section 40.91 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.91 What validity tests must laboratories...

  6. 49 CFR 40.91 - What validity tests must laboratories conduct on primary specimens?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false What validity tests must laboratories conduct on primary specimens? 40.91 Section 40.91 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.91 What validity tests must laboratories...

  7. 4. Exterior view of Components Test Laboratory (T27), looking northeast. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Exterior view of Components Test Laboratory (T-27), looking northeast. The building wing on the left houses Test Cell 8 (oxidizer) and the oxidizer storage pit or vault, and that on the right houses Test Cell 10 (environmental). - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  8. 5. Exterior view of Components Test Laboratory (T27), looking northwest. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Exterior view of Components Test Laboratory (T-27), looking northwest. The building wing on the left houses Test Cell 10 (environmental), and that on the right houses Test Cell 9 (fuel) and the fuel storage pit or vault. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  9. What's Happening on the School Bus Performance Front?

    ERIC Educational Resources Information Center

    Combs, Hanford L.

    The most urgent order of business in the national scene is to complete the development of a series of new performance tests for school bus bodies and chassis to establish a benchmark for safe construction that can be verified by independent testing agencies. Such performance tests should incorporate the new Federal Joint Strength Efficiency…

  10. Direct laboratory tensile testing of select yielding rock bolt systems

    SciTech Connect

    VandeKraats, J.D.; Watson, S.O.

    1996-08-01

    Yielding rock bolt support systems have been developed to accommodate ground movement in shifting ground such as in coal operations; in creeping ground such as salt, trona, and potash; and in swelling ground associated with some clays. These systems, designed to remain intact despite ground movement, should enhance mine safety and help contain costs in areas where rebolting of rigid non-yielding systems is typically required. Four such systems were tested in straight tensile pulls in the laboratory. They include the Slip Nut System from Dywidag Systems International USA, Inc., Ischebeck`s bolt mounted Titan Load Indicator, Rocky Mountain Bolt Company`s Yielding Cable Bolt, and a rock bolt installed variation of the yielding steel post developed by RE/SPEC Inc. The first two systems are currently marketed products and the latter two are prototype systems. Each system responds to load and displacement by yielding in an unique manner. All are designed to yield at predetermined loads. A description of each system and its yield function is provided. Each system was tested over its prescribed yield range in a test machine. At least five tests were performed on each system. Each system yielded and continued to provide support according to its design. Each shows promise for ground control use in shifting or creeping rock. This work helps to illustrate the comparative differences in performance between these specialized systems and the applications where they may be most useful.

  11. [Problems of lung function testing in the laboratory].

    PubMed

    Tojo, Naoko

    2006-08-01

    Spirometry is indispensable for the screening test of general respiratory function, and measurements of lung volume and diffusing capacity play an important role in the assessment of disease severity, functional disability, disease activity and response to treatment. Pulmonary function testing requires cooperation between the subjects and the examiner, and the results obtained depend on technical as well as personal factors. In order to diminish the variability of results and improve measurement accuracy, the Japan Respiratory Society published the first guidelines on the standardization of spirometry and diffusing capacity for both technical and clinical staff in 2004. It is therefore essential to distribute the guidelines to both laboratory personnel and general physicians. Furthermore, training workshops are mandatory to improve their understanding of the basics of lung function testing. Recently, there has been increasing interest in noninvasive methods of lung function testing without requiring the patient's cooperation during spontaneous breathing. Three alternative techniques, i.e. the negative expiratory pressure (NEP) method to detect expiratory flow limitation, impulse oscillation system (IOS) to measure respiratory system resistance (Rrs) and reactance (Xrs), and interruption resistance (Rint) to measure respiratory resistance have been introduced. Further study is required to determine the advantage of these methods. PMID:16989403

  12. Useful laboratory tests for studying thrombogenesis in acute cardiac syndromes.

    PubMed

    Fareed, J; Hoppensteadt, D A; Leya, F; Iqbal, O; Wolf, H; Bick, R

    1998-08-01

    We review laboratory tests that evaluate thrombogenesis during acute coronary syndromes. These tests have been found to be valuable research tools in more clearly understanding the pathophysiology of acute coronary syndromes. In particular, we describe tissue factor, tissue factor pathway inhibitor, prothrombin fragment 1.2, thrombin-antithrombin complex, fibrinopeptide A, tissue plasminogen activator (t-PA), plasminogen activator inhibitor-1 (PAI-1), t-PA-PAI complex, Bbeta 15-42-related peptides, fibrinogen degradation products, fibrin degradation products, D-dimer, platelet factor 4, beta-thromboglobulin, 5-hydroxytryptamine, thromboxane B2, prostacyclin, endothelin, angiotensin-converting enzyme, soluble thrombomodulin, C1-esterase inhibitor, anaphylotoxins C3a, C4a, and C5a, bradykinin, tumor necrosis factor, leukotriene C4, platelet activating factor, anti-phospholipid antibody, and von Willebrand factor. Some of these tests may prove to be useful in clinical diagnosis and management of acute coronary syndromes. Clinical outcome studies are needed to determine which tests may be cost effective and medically useful. PMID:9702994

  13. EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory

    NASA Technical Reports Server (NTRS)

    Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.

    2012-01-01

    As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.

  14. Current Concepts in Laboratory Testing to Guide Antimicrobial Therapy

    PubMed Central

    Jenkins, Stephen G.; Schuetz, Audrey N.

    2012-01-01

    Antimicrobial susceptibility testing (AST) is indicated for pathogens contributing to an infectious process that warrants antimicrobial therapy if susceptibility to antimicrobials cannot be predicted reliably based on knowledge of their identity. Such tests are most frequently used when the etiologic agents are members of species capable of demonstrating resistance to commonly prescribed antibiotics. Some organisms have predictable susceptibility to antimicrobial agents (ie, Streptococcus pyogenes to penicillin), and empirical therapy for these organisms is typically used. Therefore, AST for such pathogens is seldom required or performed. In addition, AST is valuable in evaluating the activity of new and experimental compounds and investigating the epidemiology of antimicrobial resistant pathogens. Several laboratory methods are available to characterize the in vitro susceptibility of bacteria to antimicrobial agents. When the nature of the infection is unclear and the culture yields mixed growth or usual microbiota (wherein the isolates usually bear little relationship to the actual infectious process), AST is usually unnecessary and results may, in fact, be dangerously misleading. Phenotypic methods for detection of specific antimicrobial resistance mechanisms are increasingly being used to complement AST (ie, inducible clindamycin resistance among several gram-positive bacteria) and to provide clinicians with preliminary direction for antibiotic selection pending results generated from standardized AST (ie, β-lactamase tests). In addition, molecular methods are being developed and incorporated by microbiology laboratories into resistance detection algorithms for rapid, sensitive assessment of carriage states of epidemiologically and clinically important pathogens, often directly from clinical specimens (ie, presence of vancomycin-resistant enterococci in fecal specimens). PMID:22386185

  15. 33 CFR 209.340 - Laboratory investigations and materials testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... authority. Requests for approval shall be addressed to DAEN-CWE-DC. (2) Hydraulic laboratories. Division Engineers and District Engineers operating hydraulic laboratories or hydraulic model laboratories are... hydraulic laboratories, and to the Inter-Agency Sedimentation Project. (c) References. (1) AR 37-20. (2)...

  16. 33 CFR 209.340 - Laboratory investigations and materials testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... authority. Requests for approval shall be addressed to DAEN-CWE-DC. (2) Hydraulic laboratories. Division Engineers and District Engineers operating hydraulic laboratories or hydraulic model laboratories are... hydraulic laboratories, and to the Inter-Agency Sedimentation Project. (c) References. (1) AR 37-20. (2)...

  17. American Fuel Cell Bus Project Evaluation. Second Report

    SciTech Connect

    Eudy, Leslie; Post, Matthew

    2015-09-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.

  18. Tests for oil/dispersant toxicity: In situ laboratory assays

    SciTech Connect

    Wright, D.A.; Coelho, G.M.; Aurand, D.V.

    1995-12-31

    As part of its readiness program in oil spill response, the Marine Pollution Control Unit (MPCU), Department of Transport, U.K. conducts annual field trials in the North Sea, approximately 30 nautical miles from the southeast coast of England. The trials take the form of controlled releases of crude oil or Medium Fuel/Gas Oil mix (MFO), with and without the application of Corexit 9527 dispersant. In 1994 and 1995 the authors conducted a series of in situ toxicity bioassays in association with these spills with included 48h LC50 tests for turbot (Scophthalmus maximus) and oyster (Crassostrea gigas) larvae, a 48 h oyster (C. gigas) embryonic development test and two full life-cycle assays using the copepods Acartia tonsa and Tisbe battagliai. Tests were also conducted in the Chesapeake Bay laboratory using estuarine species including the copepod Eurytemora affinis and the inland silverside Menidia beryllina. Here, the authors report on the results of these assays, together with 1996 in situ toxicity data resulting from Norwegian field trials in the northern North Sea.

  19. Leaching of saltstone: Laboratory and field testing and mathematical modeling

    SciTech Connect

    Grant, M.W.; Langton, C.A.; Oblath, S.B.; Pepper, D.W.; Wallace, R.M.; Wilhite, E.L.; Yau, W.W.F.

    1987-01-01

    A low-level alkaline salt solution will be a byproduct in the processing of high-level waste at the Savannah River Plant (SRP). This solution will be incorporated into a wasteform, saltstone, and disposed of in surface vaults. Laboratory and field leach testing and mathematical modeling have demonstrated the predictability of contaminant release from cement wasteforms. Saltstone disposal in surface vaults will meet the design objective, which is to meet drinking water standards in shallow groundwater at the disposal area boundary. Diffusion is the predominant mechanism for release of contaminants to the environment. Leach testing in unsaturated soil, at soil moisture levels above 1 wt %, has shown no difference in leach rate compared to leaching in distilled water. Field leach testing of three thirty-ton blocks of saltstone in lysimeters has been underway since January 1984. Mathematical models were applied to assess design features for saltstone disposal. One dimensional infinite-composite and semi-infinite analytical models were developed for assessing diffusion of nitrate from saltstone through a cement barrier. Numerical models, both finite element and finite difference, were validated by comparison of model predictions with the saltstone lysimeter results. Validated models were used to assess the long-term performance of the saltstone stored in surface vaults. The maximum concentrations of all contaminants released from saltstone to shallow groundwater are predicted to be below drinking water standards at the disposal area boundary. 5 refs., 11 figs., 5 tabs.

  20. Dynamic Stability Testing of the Mars Science Laboratory Entry Capsule

    NASA Technical Reports Server (NTRS)

    Schroenenberger, Mark; Yates, Leslie; Hathaway, Wayne

    2009-01-01

    Results from a 26 shot ballistic range test of the Mars Science Laboratory (MSL) entry capsule are presented. The supersonic pitch damping properties of the MSL capsule were characterized between Mach 1.35 and Mach 3.5 and total angles-of-attack from 0 to 30 degrees. In flight, the MSL entry capsule will utilize a radial center-of-gravity offset to produce a non-zero trim angle-of-attack. This offset trim angle will produce lift, enabling the capsule to fly a guided entry and reducing the landing footprint dimensions to within 10 km of the desired landing site. A lifting configuration could not be tested at the ballistic range used for this test as the models would swerve into the range walls, possibly damaging cameras, the coordinate reference system or other facility assets. Ballistic (non-lifting) data was extracted and will be implemented in a conservative fashion to ensure that the dynamic stability characteristics of the flight vehicle are bounded. A comparison between the MSL pitch damping results and the dynamic model of the Mars Exploration Rover capsule shows generally close agreement with no significant differences in damping characteristics due to the change in backshell geometry. Dynamic moments are also compared to the MSL reaction control system (RCS) control authority to show the controller has sufficient margin to easily damp any dynamic stability effects.

  1. Laboratory tests of IEC DER object models for grid applications.

    SciTech Connect

    Blevins, John D.; Menicucci, David F.; Byrd, Thomas, Jr.; Gonzalez, Sigifredo; Ginn, Jerry W.; Ortiz-Moyet, Juan

    2007-02-01

    This report describes a Cooperative Research and Development Agreement (CRADA) between Salt River Project Agricultural Improvement and Power District (SRP) and Sandia National Laboratories to jointly develop advanced methods of controlling distributed energy resources (DERs) that may be located within SRP distribution systems. The controls must provide a standardized interface to allow plug-and-play capability and should allow utilities to take advantage of advanced capabilities of DERs to provide a value beyond offsetting load power. To do this, Sandia and SRP field-tested the IEC 61850-7-420 DER object model (OM) in a grid environment, with the goal of validating whether the model is robust enough to be used in common utility applications. The diesel generator OM tested was successfully used to accomplish basic genset control and monitoring. However, as presently constituted it does not enable plug-and-play functionality. Suggestions are made of aspects of the standard that need further development and testing. These problems are far from insurmountable and do not imply anything fundamentally unsound or unworkable in the standard.

  2. Turbulent Aeroheating Testing of Mars Science Laboratory Entry Vehicle

    NASA Technical Reports Server (NTRS)

    Hollis, Brian R.; Collier, Arnold S.

    2008-01-01

    An experimental investigation of turbulent aeroheating on the Mars Science Laboratory entry vehicle heat shield has been conducted in the Arnold Engineering Development Center Hypervelocity Wind Tunnel No. 9. Testing was performed on a 6-in. (0.1524 m) diameter MSL model in pure N2 gas in the tunnel's Mach 8 and Mach 10 nozzles at free stream Reynolds numbers of 4.1 x 10(exp 6)/ft to 49 x 10(exp 6)/ft (1.3 x 10(exp 7)/m to 19 x 10(exp 6/ft) and 1.2 x 10(exp 6)/ft to 19 x 10(exp 6)/ft (0.39 x 10(exp 7)/m to 62 x 10(exp 7)/m), respectively. These conditions were sufficient to span the regime of boundary-layer flow from completely laminar to fully-developed turbulent flow over the entire forebody. A supporting aeroheating test was also conducted in the Langley Research Center 20-Inch Mach 6 Air Tunnel at free stream Reynolds number of 1 x 10(exp 6)/ft to 7 x 10(exp 6)/ft (0.36 x 10(exp 7)/m to 2.2 x 10(exp 7)/m) in order to help corroborate the Tunnel 9 results. A complementary computational fluid dynamics study was conducted in parallel to the wind tunnel testing. Laminar and turbulent predictions were generated for the wind tunnel test conditions and comparisons were performed with the data for the purpose of helping to define uncertainty margins on predictions for aeroheating environments during entry into the Martian atmosphere. Data from both wind tunnel tests and comparisons with the predictions are presented herein. It was concluded from these comparisons that for perfect-gas conditions, the computational tools could predict fully-laminar or fully-turbulent heating conditions to within 12% or better of the experimental data.

  3. Chylomicrons: Advances in biology, pathology, laboratory testing, and therapeutics.

    PubMed

    Julve, Josep; Martín-Campos, Jesús M; Escolà-Gil, Joan Carles; Blanco-Vaca, Francisco

    2016-04-01

    The adequate absorption of lipids is essential for all mammalian species due to their inability to synthesize some essential fatty acids and fat-soluble vitamins. Chylomicrons (CMs) are large, triglyceride-rich lipoproteins that are produced in intestinal enterocytes in response to fat ingestion, which function to transport the ingested lipids to different tissues. In addition to the contribution of CMs to postprandial lipemia, their remnants, the degradation products following lipolysis by lipoprotein lipase, are linked to cardiovascular disease. In this review, we will focus on the structure-function and metabolism of CMs. Second, we will analyze the impact of gene defects reported to affect CM metabolism and, also, the role of CMs in other pathologies, such as atherothrombotic cardiovascular disease and diabetes mellitus. Third, we will provide an overview of the laboratory tests currently used to study CM disorders, and, finally, we will highlight current treatments in diseases affecting CMs. PMID:26868089

  4. Laboratory tests for disorders of complement and complement regulatory proteins.

    PubMed

    Shih, Angela R; Murali, Mandakolathur R

    2015-12-01

    The complement pathway is a cascade of proteases that is involved in immune surveillance and innate immunity, as well as adaptive immunity. Dysfunction of the complement cascade may be mediated by aberrations in the pathways of activation, complement regulatory proteins, or complement deficiencies, and has been linked to a number of hematologic disorders, including paroxysmal noctural hemoglobinuria (PNH), hereditary angioedema (HAE), and atypical hemolytic-uremic syndrome (aHUS). Here, current laboratory tests for disorders of the complement pathway are reviewed, and their utility and limitations in hematologic disorders and systemic diseases are discussed. Current therapeutic advances targeting the complement pathway in treatment of complement-mediated hematologic disorders are also reviewed. PMID:26437749

  5. Laboratory Testing of a Phased Induced Amplitude Apodization (PIAA) Coronagraph

    NASA Technical Reports Server (NTRS)

    Kern, Brian; Guyon, Olivier; Give'on, Amir; Kuhnert, Andreas; Niessner, Albert

    2011-01-01

    We present high-contrast images from laboratory testing of a Phase Induced Amplitude Apodization (PIAA) coronagraph at NASA's High Contrast Imaging Testbed (HCIT). Using a deformable mirror and wavefront estimation and control algorithms, we create a 'dark hole' in the monochromatic point-spread function with an inner working angle of (2.05 f lambda/D), with a mean intensity 3.5x10(exp -8). We discuss the contributions to this floor, and the techniques being developed to improve it. We also present simulations that investigate the effect of Lyot stops of various sizes, and conclude that a Lyot stop is necessary for 10(exp -9) performance but that an annular postapodizer is not necessary.

  6. Test and Validation of the Mars Science Laboratory Robotic Arm

    NASA Technical Reports Server (NTRS)

    Robinson, M.; Collins, C.; Leger, P.; Kim, W.; Carsten, J.; Tompkins, V.; Trebi-Ollennu, A.; Florow, B.

    2013-01-01

    The Mars Science Laboratory Robotic Arm (RA) is a key component for achieving the primary scientific goals of the mission. The RA supports sample acquisition by precisely positioning a scoop above loose regolith or accurately preloading a percussive drill on Martian rocks or rover-mounted organic check materials. It assists sample processing by orienting a sample processing unit called CHIMRA through a series of gravity-relative orientations and sample delivery by positioning the sample portion door above an instrument inlet or the observation tray. In addition the RA facilitates contact science by accurately positioning the dust removal tool, Alpha Particle X-Ray Spectrometer (APXS) and the Mars Hand Lens Imager (MAHLI) relative to surface targets. In order to fulfill these seemingly disparate science objectives the RA must satisfy a variety of accuracy and performance requirements. This paper describes the necessary arm requirement specification and the test campaign to demonstrate these requirements were satisfied.

  7. 42 CFR 493.807 - Condition: Reinstatement of laboratories performing nonwaived testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., subspecialty, or analyte, the laboratory must then demonstrate sustained satisfactory performance on two... Subspecialty for Laboratories Performing Tests of Moderate Complexity (Including the Subcategory), High... nonwaived testing. 493.807 Section 493.807 Public Health CENTERS FOR MEDICARE & MEDICAID...

  8. 42 CFR 493.1453 - Condition: Laboratories performing high complexity testing; clinical consultant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Condition: Laboratories performing high complexity testing; clinical consultant. The laboratory must have a... testing; clinical consultant. 493.1453 Section 493.1453 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  9. An interactive wireless communication system for visually impaired people using city bus transport.

    PubMed

    Wang, Hsiao-Lan; Chen, Ya-Ping; Rau, Chi-Lun; Yu, Chung-Huang

    2014-05-01

    Visually impaired people have difficulty accessing information about public transportation systems. Several systems have been developed for assisting visually impaired and blind people to use the city bus. Most systems provide only one-way communication and require high-cost and complex equipment. The purpose of this study is to reduce the difficulties faced by visually impaired people when taking city buses, using an interactive wireless communication system. The system comprised a user module and a bus module to establish a direct one-to-one connection. When the user inputs 4-digit numbers, the user module immediately sends out the information. If the bus module receives the matched bus number, it buzzes and the warning LED flashes to notify the bus driver that someone is waiting to board on the bus. User tests were conducted by two visually impaired people in a simulated vehicle and a city bus. The success rate of interactive wireless communication, recognizing the arrival of the bus and boarding the correct bus reached 100% in all of the tests. The interactive wireless communication aid system is a valid and low-cost device for assisting visually impaired people to use city buses. PMID:24776720

  10. An Interactive Wireless Communication System for Visually Impaired People Using City Bus Transport

    PubMed Central

    Wang, Hsiao-Lan; Chen, Ya-Ping; Rau, Chi-Lun; Yu, Chung-Huang

    2014-01-01

    Visually impaired people have difficulty accessing information about public transportation systems. Several systems have been developed for assisting visually impaired and blind people to use the city bus. Most systems provide only one-way communication and require high-cost and complex equipment. The purpose of this study is to reduce the difficulties faced by visually impaired people when taking city buses, using an interactive wireless communication system. The system comprised a user module and a bus module to establish a direct one-to-one connection. When the user inputs 4-digit numbers, the user module immediately sends out the information. If the bus module receives the matched bus number, it buzzes and the warning LED flashes to notify the bus driver that someone is waiting to board on the bus. User tests were conducted by two visually impaired people in a simulated vehicle and a city bus. The success rate of interactive wireless communication, recognizing the arrival of the bus and boarding the correct bus reached 100% in all of the tests. The interactive wireless communication aid system is a valid and low-cost device for assisting visually impaired people to use city buses. PMID:24776720

  11. 42 CFR 493.1481 - Condition: Laboratories performing high complexity testing; cytotechnologist.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing high complexity... REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing High Complexity Testing § 493.1481 Condition: Laboratories performing high complexity testing; cytotechnologist. For the subspecialty...

  12. 2. Exterior view of Components Test Laboratory (T27), looking southeast. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Exterior view of Components Test Laboratory (T-27), looking southeast. The building wing on the left houses the equipment room and that on the right houses Test Cell 8 (oxidizer) and the oxidizer storage pit or vault. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  13. 3. Exterior view of Components Test Laboratory (T27), looking southeast. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Exterior view of Components Test Laboratory (T-27), looking southeast. The building wing on the left houses the equipment room, and that on the right houses Test Cell 8 (oxidizer) and the oxidizer storage pit or vault. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  14. LPT. Shield test facility test building interior (TAN646). Camera points ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility test building interior (TAN-646). Camera points down into interior of north pool. Equipment on wall is electronical bus used for post-1970 experiment. Personnel ladder at right. INEEL negative no. HD-40-9-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  15. Multi-purpose satellite bus

    NASA Technical Reports Server (NTRS)

    Sakoda, Daniel; Agrawal, Brij N.

    1991-01-01

    The Multi-Purpose Satellite bus (MPS) can be used for a number of payloads which may require different orbits, pointing accuracy, and electrical power consumption. Specifically, it was designed to accommodate the Advanced Very High Resolution Radiometer and an EHF communication payload, both of which have a three-year life. The estimated beginning-of-life weight of the MPS bus is 150 kg. It can be launched by either the Pegasus ALV or the Taurus SSLV. Configuration requirements for the different missions are discussed.

  16. 9 CFR 54.11 - Approval of laboratories to run official scrapie tests and official genotype tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Approval of laboratories to run official scrapie tests and official genotype tests. 54.11 Section 54.11 Animals and Animal Products ANIMAL... laboratories to run official scrapie tests and official genotype tests. (a) State, Federal, and...

  17. 9 CFR 54.11 - Approval of laboratories to run official scrapie tests and official genotype tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Approval of laboratories to run official scrapie tests and official genotype tests. 54.11 Section 54.11 Animals and Animal Products ANIMAL... laboratories to run official scrapie tests and official genotype tests. (a) State, Federal, and...

  18. 9 CFR 54.11 - Approval of laboratories to run official scrapie tests and official genotype tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Approval of laboratories to run official scrapie tests and official genotype tests. 54.11 Section 54.11 Animals and Animal Products ANIMAL... laboratories to run official scrapie tests and official genotype tests. (a) State, Federal, and...

  19. 9 CFR 54.11 - Approval of laboratories to run official scrapie tests and official genotype tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Approval of laboratories to run official scrapie tests and official genotype tests. 54.11 Section 54.11 Animals and Animal Products ANIMAL... laboratories to run official scrapie tests and official genotype tests. (a) State, Federal, and...

  20. 9 CFR 54.11 - Approval of laboratories to run official scrapie tests and official genotype tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Approval of laboratories to run official scrapie tests and official genotype tests. 54.11 Section 54.11 Animals and Animal Products ANIMAL... laboratories to run official scrapie tests and official genotype tests. (a) State, Federal, and...

  1. 7 CFR 3300.91 - List of approved testing stations, approved testing laboratories, and fees for certificates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CARRIAGE OF PERISHABLE FOODSTUFFS AND ON THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP... testing stations, approved testing laboratories, and fees for certificates. A current list of U.S. ATP testing stations, U.S. ATP testing laboratories, and fees for issuance of U.S. ATP certificates may...

  2. NASA Glenn Research Center Acoustical Testing Laboratory: Five year retrospective

    NASA Astrophysics Data System (ADS)

    Cooper, Beth A.; Akers, James C.; Passe, Paul J.

    2005-09-01

    In the five years since the NASA Glenn Research Center Acoustical Testing Laboratory (ATL) opened its doors in September, 2000, it has developed a comprehensive array of services and products that support hearing conservation goals within NASA and industry. The ATL provides acoustic emission testing and noise control engineering services for a variety of specialized customers, particularly developers of equipment and science experiments manifested for NASA's manned space missions. The ATL aggressively supports the vision of a low-noise on-orbit environment, which facilitates mission success as well as crew health, safety, and comfort. In concert with these goals, the ATL also produces and distributes free educational resources and low-noise advocacy tools for hearing conservation education and awareness. Among these are two compact discs of auditory demonstrations (of phenomena in acoustics, hearing conservation, and communication), and presentations, software packages, and other educational materials for use by engineers, audiologists, and other hearing conservation stakeholders. This presentation will highlight ATL's construction, history, technical capabilities, and current projects and will feature demonstrations of some of the unique educational resource materials that are distributed by the ATL.

  3. Interference of medical contrast media on laboratory testing

    PubMed Central

    Lippi, Giuseppe; Daves, Massimo; Mattiuzzi, Camilla

    2014-01-01

    The use of contrast media such as organic iodine molecules and gadolinium contrast agents is commonplace in diagnostic imaging. Although there is widespread perception that side effects and drug interactions may be the leading problems caused by these compounds, various degrees of interference with some laboratory tests have been clearly demonstrated. Overall, the described interference for iodinate contrast media include inappropriate gel barrier formation in blood tubes, the appearance of abnormal peaks in capillary zone electrophoresis of serum proteins, and a positive bias in assessment of cardiac troponin I with one immunoassay. The interference for gadolinium contrast agents include negative bias in calcium assessment with ortho-cresolphthalein colorimetric assays and occasional positive bias using some Arsenazo reagents, negative bias in measurement of angiotensin converting enzyme (ACE) and zinc (colorimetric assay), as well as positive bias in creatinine (Jaffe reaction), total iron binding capacity (TIBC, ferrozine method), magnesium (calmagite reagent) and selenium (mass spectrometry) measurement. Interference has also been reported in assessment of serum indices, pulse oximetry and methaemoglobin in samples of patients receiving Patent Blue V. Under several circumstances the interference was absent from manufacturer-supplied information and limited to certain type of reagents and/or analytes, so that local verification may be advisable to establish whether or not the test in use may be biased. Since the elimination half-life of these compounds is typically lower than 2 h, blood collection after this period may be a safer alternative in patients who have received contrast media for diagnostic purposes. PMID:24627717

  4. Response of shallow geothermal energy pile from laboratory model tests

    NASA Astrophysics Data System (ADS)

    Marto, A.; Amaludin, A.

    2015-09-01

    In shallow geothermal energy pile systems, the thermal loads from the pile, transferred and stored in the soil will cause thermally induced settlement. This factor must be considered in the geotechnical design process to avoid unexpected hazards. Series of laboratory model tests were carried out to study the behaviour of energy piles installed in kaolin soil, subjected to thermal loads and a combination of axial and thermal loads (henceforth known as thermo-axial loads). Six tests which included two thermal load tests (35°C and 40°C) and four thermo-axial load tests (100 N and 200 N, combined with 35°C and 40°C thermal loads) were conducted. To simulate the behaviour of geothermal energy piles during its operation, the thermo-axial tests were carried out by applying an axial load to the model pile head, and a subsequent application of thermal load. The model soil was compacted at 90% maximum dry density and had an undrained shear strength of 37 kPa, thus classified as having a firm soil consistency. The behaviour of model pile, having the ultimate load capacity of 460 N, was monitored using a linear variable displacement transducer, load cell and wire thermocouple, to measure the pile head settlement, applied axial load and model pile temperature. The acquired data from this study was used to define the thermo-axial response characteristics of the energy pile model. In this study, the limiting settlement was defined as 10% of the model pile diameter. For thermal load tests, higher thermal loads induced higher values of thermal settlement. At 40°C thermal load an irreversible settlement was observed after the heating and cooling cycle was applied to the model pile. Meanwhile, the pile response to thermo-axial loads were attributed to soil consistency and the magnitude of both the axial and thermal loads applied to the pile. The higher the thermoaxial loads, the higher the settlements occurred. A slight hazard on the model pile was detected, since the settlement

  5. Novel laboratory diagnostic tests for tuberculosis and their potential role in an integrated and tiered laboratory network.

    PubMed

    Somoskovi, Akos

    2015-06-01

    Lack of laboratory capacity in high-burden countries presents a significant barrier in providing diagnosis and treatment to patients infected with HIV/AIDS, tuberculosis (TB), and malaria. Strengthening laboratory services in these settings via implementation of novel diagnostic tests is especially indispensable to battle against TB and MDR/XDR-TB. Novel TB diagnostic assays have to be applicable to field conditions, affordable and accessible to all patients at different levels of the tiered laboratory network. A functional laboratory network should be based on well-developed diagnostic platforms that can provide not only timely and adequate diagnosis but are simple to use, and easy to implement and sustain. The article is overviewing the latest developments of TB laboratory diagnostics such as smear microscopy, rapid growth detection and susceptibility testing and rapid molecular testing with focus on performance and applicability to diagnostic needs at different levels of the diagnostic network. PMID:25736539

  6. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Second Results Report and Appendices

    SciTech Connect

    Eudy, L.; Chandler, K.

    2011-10-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This is the second results report for the AT fuel cell bus since it was placed in service, and it focuses on the newest data analysis and lessons learned since the previous report. The appendices, referenced in the main report, provide the full background for the evaluation. They will be updated as new information is collected but will contain the original background material from the first report.

  7. Weapons Evaluation Test Laboratory at Pantex: Testing and data handling capabilities of Sandia National Laboratories at the Pantex Plant, Amarillo, Texas

    SciTech Connect

    Peters, W.R.

    1993-08-01

    The Weapons Evaluation Test Laboratory (WETL), operated by Sandia Laboratories at the Pantex Plant in Amarillo, Texas, is engaged primarily in the testing of weapon systems in the stockpile or of newly produced weapon systems for the Sandia Surety Assessment Center. However, the WETL`s unique testing equipment and data-handling facilities are frequently used to serve other organizations. Service to other organizations includes performing special tests on weapon components, subassemblies, and systems for purposes such as basic development and specific problem investigation. The WETL staff also sends equipment to other laboratories for specific tests that cannot be performed at Pantex. For example, we modified and sent equipment to Brookhaven National Laboratory for testing with their Neutral Particle Beam. WETL supplied the engineering expertise to accomplish the needed modifications to the equipment and the technicians to help perform many special tests at Brookhaven. A variety of testing is possible within the WETL, including: Accelerometer, decelerometer, and G-switch g-level/closure testing; Neutron generator performance testing; weapon systems developmental tests; weapon system component testing; weapon system failure-mode-duplication tests; simultaneity measurements; environmental extreme testing; parachute deployment testing; permissive action link (PAL) testing and trajectory-sensing signal generator (TSSG) testing. WETL`s existing equipment configurations do not restrict the testing performed at the WETL. Equipment and facilities are adapted to specific requirements. The WETL`s facilities can often eliminate the need to build or acquire new test equipment, thereby saving time and expense.

  8. Tacoma gets the early bus

    SciTech Connect

    Kelly, T.

    1991-10-01

    What happened, then, when Tacoma, Washington and Seattle each set about choosing an alternative bus fuel in the interests of clean air Not what you'd think. In a major role reversal, Seattle got headaches, while Tacoma got the distinction of being a national pioneer. That's because it was Tacoma that chose natural gas. Ron Shipley is director of maintenance for Pierce Transit, the 11-year-old municipal corporation that runs buses in Tacoma's Pierce County. He remembers getting a call from a representative of Washington Natural Gas (WNG) in the mid-1980s. WNG was trying to cultivate interest in natural gas vehicles. The two busses were placed in service in November 1986. After a three-year initial evaluation period, Pierce County Transit drew up a report indicating it was pleased with the results this far and optimistic about the use of natural gas as a motor fuel. The company calculated a break-even of 68 cents per gallon, meaning that when diesel was at the price or above, natural gas used in its place was a money-saver. By January of this year, diesel was at $1.10 per gallon. This paper reports that emissions were not tested because of the expense involved and the fact that future conversions would use a different technology. Shipley doubted, anyway, that the 60-40 combination would quite meet the emissions standards then in effect for 1991. But is was clear at a glance that particulate matter - the biggest pollution threat from diesel buses - had been significantly reduced. And that good start encouraged Pierce Transit management to plan for a fleet of vehicles that could burn 100 percent natural gas.

  9. Multi-Sensor Testing for Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Laboratory

    NASA Technical Reports Server (NTRS)

    Brewster, L.; Johnston, A.; Howard, R.; Mitchell, J.; Cryan, S.

    2007-01-01

    The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as AR&D). The crewed missions may also perform rendezvous and docking operations and may require different levels of automation and/or autonomy, and must provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor proposed relative navigation sensor suite will meet the requirements. The relatively low technology readiness level of AR&D relative navigation sensors has been carried as one of the CEV Project's top risks. The AR&D Sensor Technology Project seeks to reduce the risk by the testing and analysis of selected relative navigation sensor technologies through hardware-in-the-loop testing and simulation. These activities will provide the CEV Project information to assess the relative navigation sensors maturity as well as demonstrate test methods and capabilities. The first year of this project focused on a series of"pathfinder" testing tasks to develop the test plans, test facility requirements, trajectories, math model architecture, simulation platform, and processes that will be used to evaluate the Contractor-proposed sensors. Four candidate sensors were used in the first phase of the testing. The second phase of testing used four sensors simultaneously: two Marshall Space Flight Center (MSFC) Advanced Video Guidance Sensors (AVGS), a laser-based video sensor that uses retroreflectors attached to the target vehicle, and two commercial laser range finders. The multi-sensor testing was conducted at MSFC's Flight Robotics Laboratory (FRL

  10. Results from laboratory and field testing of nitrate measuring spectrophotometers

    USGS Publications Warehouse

    Snazelle, Teri T.

    2015-01-01

    In Phase II, the analyzers were deployed in field conditions at three diferent USGS sites. The measured nitrate concentrations were compared to discrete (reference) samples analyzed by the Direct UV method on a Shimadzu UV1800 bench top spectrophotometer, and by the National Environmental Methods Index (NEMI) method I-2548-11 at the USGS National Water Quality Laboratory. The first deployment at USGS site 0249620 on the East Pearl River in Hancock County, Mississippi, tested the ability of the TriOs ProPs (10-mm path length), Hach NITRATAX (5 mm), Satlantic SUNA (10 mm), and the S::CAN Spectro::lyser (5 mm) to accurately measure low-level (less than 2 mg-N/L) nitrate concentrations while observing the effect turbidity and colored dissolved organic matter (CDOM) would have on the analyzers' measurements. The second deployment at USGS site 01389005 Passaic River below Pompton River at Two Bridges, New Jersey, tested the analyzer's accuracy in mid-level (2-8 mg-N/L) nitrate concentrations. This site provided the means to test the analyzers' performance in two distinct matrices—the Passaic and the Pompton Rivers. In this deployment, three instruments tested in Phase I (TriOS, Hach, and SUNA) were deployed with the S::CAN Spectro::lyser (35 mm) already placed by the New Jersey Water Science Center (WSC). The third deployment at USGS site 05579610 Kickapoo Creek at 2100E Road near Bloomington, Illinois, tested the ability of the analyzers to measure high nitrate concentrations (greater than 8 mg-N/L) in turbid waters. For Kickapoo Creek, the HIF provided the TriOS (10 mm) and S::CAN (5 mm) from Phase I, and a SUNA V2 (5 mm) to be deployed adjacent to the Illinois WSC-owned Hach (2 mm). A total of 40 discrete samples were collected from the three deployment sites and analyzed. The nitrate concentration of the samples ranged from 0.3–22.2 mg-N/L. The average absolute difference between the TriOS measurements and discrete samples was 0.46 mg-N/L. For the combined data

  11. The Wheels on the Bus Go “Buy Buy Buy”: School Bus Advertising Laws

    PubMed Central

    2012-01-01

    School buses, a practical necessity for millions of children, are at the center of new efforts to raise revenue. School bus advertising laws bring public health and commercialization concerns to the school setting. In doing so, they potentially expose school districts to First Amendment lawsuits. I examined various school bus advertising bills and laws. I reviewed First Amendment “forum analysis” as applied in the transit and school settings to clarify how this legal test may affect school districts subject to such laws. I have made recommendations for school districts to enact appropriate policies to ensure that such advertising does not undermine public health and to enable the districts to maintain control over their property. PMID:22742065

  12. The wheels on the bus go "buy buy buy": school bus advertising laws.

    PubMed

    Pomeranz, Jennifer L

    2012-09-01

    School buses, a practical necessity for millions of children, are at the center of new efforts to raise revenue. School bus advertising laws bring public health and commercialization concerns to the school setting. In doing so, they potentially expose school districts to First Amendment lawsuits. I examined various school bus advertising bills and laws. I reviewed First Amendment "forum analysis" as applied in the transit and school settings to clarify how this legal test may affect school districts subject to such laws. I have made recommendations for school districts to enact appropriate policies to ensure that such advertising does not undermine public health and to enable the districts to maintain control over their property. PMID:22742065

  13. The NASA bus communications listening device software

    NASA Technical Reports Server (NTRS)

    Allen, M. A.

    1979-01-01

    The development of the bus listener is presented. Special software was developed to control the 'bus interface units' (BIU) connecting each of these devices to a communications cable to form the bus communication network. The code used in the BTU is described.

  14. School Bus Accidents and Driver Age.

    ERIC Educational Resources Information Center

    McMichael, Judith

    The study examines the rates and types of school bus accidents according to the age of the school bus driver. Accident rates in North Carolina for the school year 1971-72 were analyzed using three sources of data: accident reports, driver and mileage data, and questionnaires administered to a sample of school bus drivers. Data were obtained on…

  15. School Bus Alert System Reduces Delays.

    ERIC Educational Resources Information Center

    Pleasnick, Stephen G.

    1985-01-01

    The school bus alert monitor is a computerized school bus alert and warning sytem that notifies parents of school bus arrival via radio frequency technology. The system also has been shown to enhance the self esteem of disabled transportation users. (CL)

  16. Capability of the Gas Analysis and Testing Laboratory at the NASA Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Broerman, Craig; Jimenez, Javier; Sweterlitsch, Jeff

    2011-01-01

    The Gas Analysis and Testing Laboratory is an integral part of the testing performed at the NASA Johnson Space Center. The Gas Analysis and Testing Laboratory is a high performance laboratory providing real time analytical instruments to support manned and unmanned testing. The lab utilizes precision gas chromatographs, gas analyzers and spectrophotometers to support the technology development programs within the NASA community. The Gas Analysis and Testing Laboratory works with a wide variety of customers and provides engineering support for user-specified applications in compressed gas, chemical analysis, general and research laboratory

  17. Capability of the Gas Analysis and Testing Laboratory at the NASA Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Broerman, Craig; Jimenez, Javier; Sweterlitsch, Jeff

    2012-01-01

    The Gas Analysis and Testing Laboratory is an integral part of the testing performed at the NASA Johnson Space Center. The Gas Analysis and Testing Laboratory is a high performance laboratory providing real time analytical instruments to support manned and unmanned testing. The lab utilizes precision gas chromatographs, gas analyzers and spectrophotometers to support the technology development programs within the NASA community. The Gas Analysis and Testing Laboratory works with a wide variety of customers and provides engineering support for user-specified applications in compressed gas, chemical analysis, general and research laboratory.

  18. Internship at NASA Kennedy Space Center's Cryogenic Test laboratory

    NASA Technical Reports Server (NTRS)

    Holland, Katherine

    2013-01-01

    NASA's Kennedy Space Center (KSC) is known for hosting all of the United States manned rocket launches as well as many unmanned launches at low inclinations. Even though the Space Shuttle recently retired, they are continuing to support unmanned launches and modifying manned launch facilities. Before a rocket can be launched, it has to go through months of preparation, called processing. Pieces of a rocket and its payload may come in from anywhere in the nation or even the world. The facilities all around the center help integrate the rocket and prepare it for launch. As NASA prepares for the Space Launch System, a rocket designed to take astronauts beyond Low Earth Orbit throughout the solar system, technology development is crucial for enhancing launch capabilities at the KSC. The Cryogenics Test Laboratory at Kennedy Space Center greatly contributes to cryogenic research and technology development. The engineers and technicians that work there come up with new ways to efficiently store and transfer liquid cryogens. NASA has a great need for this research and technology development as it deals with cryogenic liquid hydrogen and liquid oxygen for rocket fuel, as well as long term space flight applications. Additionally, in this new era of space exploration, the Cryogenics Test Laboratory works with the commercial sector. One technology development project is the Liquid Hydrogen (LH2) Ground Operations Demonstration Unit (GODU). LH2 GODU intends to demonstrate increased efficiency in storing and transferring liquid hydrogen during processing, loading, launch and spaceflight of a spacecraft. During the Shuttle Program, only 55% of hydrogen purchased was used by the Space Shuttle Main Engines. GODU's goal is to demonstrate that this percentage can be increased to 75%. Figure 2 shows the GODU layout when I concluded my internship. The site will include a 33,000 gallon hydrogen tank (shown in cyan) with a heat exchanger inside the hydrogen tank attached to a

  19. Synchronizing Data-Bus Messages

    NASA Technical Reports Server (NTRS)

    Harris, L. H.

    1985-01-01

    Adapter allows communications among as many as 30 data processors without central bus controller. Adapter improves reliability of multiprocessor system by eliminating point of failure that causes entire system to fail. Scheme prevents data collisions and eliminates nonessential polling, thereby reducing power consumption.

  20. The Great School Bus Controversy.

    ERIC Educational Resources Information Center

    Mills, Nicolaus, Ed.

    This anthology attempts to put the great school bus controversy of the 1970's in perspective by providing a forum in which a series of widely differing views, backed by hard data, can be compared. The first section, "Background and Legal History," places the controversy in a perspective that predates the 1970's. One article focuses on the history…

  1. Pybus -- A Python Software Bus

    SciTech Connect

    Lavrijsen, Wim T.L.P.

    2004-10-14

    A software bus, just like its hardware equivalent, allows for the discovery, installation, configuration, loading, unloading, and run-time replacement of software components, as well as channeling of inter-component communication. Python, a popular open-source programming language, encourages a modular design on software written in it, but it offers little or no component functionality. However, the language and its interpreter provide sufficient hooks to implement a thin, integral layer of component support. This functionality can be presented to the developer in the form of a module, making it very easy to use. This paper describes a Pythonmodule, PyBus, with which the concept of a ''software bus'' can be realized in Python. It demonstrates, within the context of the ATLAS software framework Athena, how PyBus can be used for the installation and (run-time) configuration of software, not necessarily Python modules, from a Python application in a way that is transparent to the end-user.

  2. [Activity of ISO/TC212, clinical laboratory testing and in vitro diagnostic test systems].

    PubMed

    Kawai, T

    1998-10-01

    ISO is the International Organization for Standardization, which is a worldwide federation of national standards bodies from 130 countries, one from each country. ISO is a non-governmental organization established in 1947. ISO/TC212, Clinical laboratory testing and in vitro diagnostic test systems was newly established in 1995, consisting of 86 P-members and 12 O-members. ISO/TC212 secretariat is the American National Standards Institute, and NCCLS carries out its secretarial activity. On behalf of the Japanese Industrial Standards Committee (JISC), the Japanese Committee for Clinical Laboratory Standards (JCCLS) serves as the secretariat for the ISO/TC212 National Technical Advisory Group. Three working groups are in the process of preparing the Draft International Standards (DIS) among 9 work items. The next plenary session of ISO/TC212 will be held on May 19-21, 1999 in Tokyo, Japan. PMID:9816905

  3. Test plan: Laboratory-scale testing of the first core sample from Tank 102-AZ

    SciTech Connect

    Morrey, E.V.

    1996-03-01

    The overall objectives of the Radioactive Process/Product Laboratory Testing (RPPLT), WBS 1.2.2.05.05, are to confirm that simulated HWVP feed and glass are representative of actual radioactive HWVP feed and glass and to provide radioactive leaching and glass composition data to WFQ. This study will provide data from one additional NCAW core sample (102-AZ Core 1) for these purposes.

  4. Dust accelerator tests of the LDEX laboratory model

    NASA Astrophysics Data System (ADS)

    Li, Y. W.; Bugiel, S.; Hofmann, B.; Horanyi, M.; Sternovsky, Z.; Srama, R.

    2015-10-01

    The LDEX (Lunar Dust EXperiment) sensor onboard lunar orbiter LADEE (Lunar Atmosphere and Dust Environment Explorer) was designed to characterize the size and spatial distributions of micron and sub-micron sized dust grains. Recent results of the data analysis showed strong evidence for the existence of a dust cloud around the moon. LDEX performs in situ measurements of dust impacts along the LADEE or-bit. The impact speed of the observed dust grains is close to 1.7 km/s (the speed of the spacecraft), since the dust grains are considered on bound orbits close to the maximum height of their ballistic motion. LDEX is an impact ionization dust detector for in situ measurements. The detection of a dust grains is based on measuring the charge generated by high speed impacts (>1km/s) on a rhodium coated target. The impact charge Q is a function of both the speed v and the mass m of the impacting dust particle. The characteristic values are dependent on the instrument geometry, the impact surface properties (material), the impact geometry (impact angle) and the particle properties (material, density, speed, mass, shape). In our tests we used PPy-coated olivine and PPy-coated ortho-pyroxene with impact speeds around 1.7 km/s. A LDEX laboratory model was designed and manufactured by the University of Stuttgart. The model is used to support calibration activities of the Univ. of Colorado and to perform special tests (impact angle and impact location variations) at the dust accelerator facility at MPI-K (Heidelberg) which is operated by the IRS of the University of Stuttgart.

  5. Laboratory testing of cement grouting of fractures in welded tuff

    SciTech Connect

    Sharpe, C.J.; Daemen, J.J.

    1991-03-01

    Fractures in the rock mass surrounding a repository and its shafts, access drifts, emplacement rooms and holes, and exploratory or in-situ testing holes, may provide preferential flowpaths for the flow of groundwater or air, potentially containing radionuclides. Such cracks may have to be sealed. The likelihood that extensive or at least local grouting will be required as part of repository sealing has been noted in numerous publications addressing high level waste repository closing. The objective of this work is to determine the effectiveness of fracture sealing (grouting) in welded tuff. Experimental work includes measurement of intact and fracture permeability under various normal stresses and injection pressures. Grout is injected into the fractures. The effectiveness of grouting is evaluated in terms of grout penetration and permeability reduction, compared prior to and after grouting. Analysis of the results include the effect of normal stress, injection pressure, fracture roughness, grout rheology, grout bonding, and the radial extent of grout penetration. Laboratory experiments have been performed on seventeen tuff cylinders with three types of fractures: (1) tension induced cracks, (2) natural fractures, and (3) sawcuts. Prior to grouting, the hydraulic conductivity of the intact rock and of the fractures is measured under a range of normal stresses. The surface topography of the fracture is mapped, and the results are used to determine aperture distributions across the fractures. 72 refs., 76 figs., 25 tabs.

  6. [Postmenopausal osteoporosis: when is it necessary to perform laboratory testing? Which testing strategy?].

    PubMed

    Frayssinet, C; Trémollieres, F

    2008-06-01

    Causes of secondary osteoporosis represent 10 to 20% of all postmenopausal osteoporosis causes. Accordingly, laboratory testing needs to be performed to exclude those conditions before any therapeutic strategy. It is particularly the case in women with a recent fragility fracture or in otherwise healthy women with unexplained low bone mineral density. While there is no consensus for a simple testing strategy, evaluation of serum and urine calcium, phosphate, creatinine with 25-hydroxyvitamin D and complete blood count including erythrocyte sedimentation rate and possibly protein electrophoresis and serum thyroid-stimulating hormone could be recommended. PMID:18539507

  7. 42 CFR 493.1415 - Condition: Laboratories performing moderate complexity testing; clinical consultant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laboratory must have a clinical consultant who meets the qualification requirements of § 493.1417 of this... complexity testing; clinical consultant. 493.1415 Section 493.1415 Public Health CENTERS FOR MEDICARE... LABORATORY REQUIREMENTS Personnel for Nonwaived Testing Laboratories Performing Moderate Complexity...

  8. 7. Exterior view of Components Test Laboratory (T27), looking south. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Exterior view of Components Test Laboratory (T-27), looking south. The wing in the immediate foreground houses the equipment room. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  9. 40 CFR Appendix II to Part 1054 - Duty Cycles for Laboratory Testing

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... during idle at its warm idle speed as described in 40 CFR 1065.510. (b) Test nonhandheld engines with one... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Duty Cycles for Laboratory Testing II.... 1054, App. II Appendix II to Part 1054—Duty Cycles for Laboratory Testing (a) Test handheld...

  10. 30 CFR 14.21 - Laboratory-scale flame test apparatus.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Laboratory-scale flame test apparatus. 14.21... Technical Requirements § 14.21 Laboratory-scale flame test apparatus. The principal parts of the apparatus used to test for flame resistance of conveyor belts are as follows— (a) A horizontal test chamber...

  11. 30 CFR 14.21 - Laboratory-scale flame test apparatus.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Laboratory-scale flame test apparatus. 14.21... Technical Requirements § 14.21 Laboratory-scale flame test apparatus. The principal parts of the apparatus used to test for flame resistance of conveyor belts are as follows— (a) A horizontal test chamber...

  12. 40 CFR Appendix II to Part 1054 - Duty Cycles for Laboratory Testing

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... during idle at its warm idle speed as described in 40 CFR 1065.510. (b) Test nonhandheld engines with one... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Duty Cycles for Laboratory Testing II.... 1054, App. II Appendix II to Part 1054—Duty Cycles for Laboratory Testing (a) Test handheld...

  13. Recommended procedures for performance testing of radiobioassay laboratories: Volume 2, In vitro samples

    SciTech Connect

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of in vitro test samples (artificial urine and fecal matter) for indirect bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 8 refs., 3 tabs.

  14. Analysis of robustness of urban bus network

    NASA Astrophysics Data System (ADS)

    Tao, Ren; Yi-Fan, Wang; Miao-Miao, Liu; Yan-Jie, Xu

    2016-02-01

    In this paper, the invulnerability and cascade failures are discussed for the urban bus network. Firstly, three static models(bus stop network, bus transfer network, and bus line network) are used to analyse the structure and invulnerability of urban bus network in order to understand the features of bus network comprehensively. Secondly, a new way is proposed to study the invulnerability of urban bus network by modelling two layered networks, i.e., the bus stop-line network and the bus line-transfer network and then the interactions between different models are analysed. Finally, by modelling a new layered network which can reflect the dynamic passenger flows, the cascade failures are discussed. Then a new load redistribution method is proposed to study the robustness of dynamic traffic. In this paper, the bus network of Shenyang City which is one of the biggest cities in China, is taken as a simulation example. In addition, some suggestions are given to improve the urban bus network and provide emergency strategies when traffic congestion occurs according to the numerical simulation results. Project supported by the National Natural Science Foundation of China (Grant Nos. 61473073, 61374178, 61104074, and 61203329), the Fundamental Research Funds for the Central Universities (Grant Nos. N130417006, L1517004), and the Program for Liaoning Excellent Talents in University (Grant No. LJQ2014028).

  15. Mapping laboratory test codes to LOINC for a regional health information exchange.

    PubMed

    Porter, Jameson P; Starmer, Jack; King, Janet; Frisse, Mark E

    2007-01-01

    Fully mapping laboratory tests to LOINC greatly increases functionality within a regional data exchange, but it is a costly process. As an inexpensive approach, we defined 53 "clinically significant" labs to map within the Memphis, Tennessee RHIO. These tests comprised a small percentage of unique test codes but a large percentage of laboratory message volume. We propose mapping a few clinically significant laboratory tests can deliver a low cost increase in functionality for a RHIO. PMID:18694179

  16. Electrical system architecture having high voltage bus

    DOEpatents

    Hoff, Brian Douglas; Akasam, Sivaprasad

    2011-03-22

    An electrical system architecture is disclosed. The architecture has a power source configured to generate a first power, and a first bus configured to receive the first power from the power source. The architecture also has a converter configured to receive the first power from the first bus and convert the first power to a second power, wherein a voltage of the second power is greater than a voltage of the first power, and a second bus configured to receive the second power from the converter. The architecture further has a power storage device configured to receive the second power from the second bus and deliver the second power to the second bus, a propulsion motor configured to receive the second power from the second bus, and an accessory motor configured to receive the second power from the second bus.

  17. Independent detector testing laboratory and the NGST detector characterization project

    NASA Astrophysics Data System (ADS)

    Figer, Donald F.; Rauscher, Bernard J.; Regan, Michael W.; Balleza, Jesus C.; Barkhouser, Robert H.; Bergeron, Louis E.; Greene, Gretchen R.; Kim, Sungsoo; McCandliss, Stephan R.; Morse, Ernie; Pelton, Russell; Reeves, Thomas; Sharma, Utkarsh; Stemniski, P.; Stockman, Hervey S.; Telewicz, M.

    2003-03-01

    The Independent Detector Testing Laboratory (IDTL) has been established by the Space Telescope Science Institute (STScI) and the Johns Hopkins University (JHU), and it will assist the Next Generation Space Telescope (NGST) mission in choosing and operating the best near-infrared detectors. The NGST is the centerpiece of the NASA Office of Space Science theme, the Astronomical Search for Origins, and the highest priority astronomy project for the next decade, according to the National Academy of Science. NGST will need to have the sensitivity to see the first light in the Universe to determine how galaxies formed in the web of dark matter that existed when the Universe was in its infancy (z ~10-20). To achieve this goal, the NGST Project must pursue an aggressive technology program and advance infrared detectors to performance levels beyond what is now possible. As part of this program, NASA has selected the IDTL to verify comparative performance between prototype NGST detectors developed by Rockwell Scientific (HgCdTe) and Raytheon (InSb). The IDTL is charged with obtaining an independent assessment of the ability of these two competing technologies to achieve the demanding specifications of the NGST program within the 0.6-5 μm bandpass and in an ultra-low background (<0.01 e-/s/pixel) environment. We describe the NGST Detector Characterization Project that is being performed in the IDTL. In this project, we will measure first-order detector parameters, i.e. dark current, read noise, QE, intra-pixel sensitivity, linearity, as functions of temperature, well size, and operational mode.

  18. The Independent Detector Testing Laboratory and the JWST Detector Program

    NASA Astrophysics Data System (ADS)

    Figer, D. F.; Rauscher, B. J.; Regan, M. W.; Balleza, J.; Barkhouser, R.; Bergeron, L.; Greene, G. R.; McCandliss, S. R.; Morse, E.; Reeves, T.; Stockman, H. S.

    2002-12-01

    The Independent Detector Testing Laboratory (IDTL) is jointly operated by the Space Telescope Science Institute (STScI) and the Johns Hopkins University (JHU), and is assisting the James Webb Space Telescope (JWST) mission in choosing and operating the best near-infrared detectors. The JWST is the centerpiece of the NASA Office of Space Science theme, the Astronomical Search for Origins, and the highest priority astronomy project for the next decade, according to the National Academy of Science. JWST will need to have the sensitivity to see the first light in the Universe to determine how galaxies formed in the web of dark matter that existed when the Universe was in its infancy (z ~10-20). To achieve this goal, the JWST Project must pursue an aggressive technology program and advance infrared detectors to performance levels beyond what is now possible. As part of this program, NASA has selected the IDTL to verify comparative performance between prototype JWST detectors developed by Rockwell Scientific (HgCdTe) and Raytheon (InSb). The IDTL is charged with obtaining an independent assessment of the ability of these two competing technologies to achieve the demanding specifications of the JWST program within the 0.6-5 μ m bandpass and in an ultra-low background (<0.01 e-/s/pixel) environment. We describe the JWST Detector Characterization Project that is being performed in the IDTL. In this project, we will measure first-order detector parameters, i.e. dark current, read noise, QE, intra-pixel sensitivity, linearity, as functions of temperature, well size, and operational mode.

  19. Laboratory experiments designed to test the remediation properties of materials

    SciTech Connect

    Gilbert, J.S.; Wildeman, T.R.; Ford, K.L.

    1999-07-01

    Passive treatment systems constructed to remediate mine drainage have proven to be very successful for a wide variety of drainage compositions and volumes. The construction of an anaerobic passive treatment system requires a mixture of local materials with the objective of producing a system that allows adequate water flow while supporting the growth of sulfate-reducing bacteria. These bacteria have the effect of reducing the oxidizing potential in the system causing many sulfide-forming metals in solution to precipitate. The focus of these experiments was the study of chemical characteristics of materials, individually and in mixtures, with the purpose of determining which would be best suited for incorporation into a treatment system. The materials of interest were manure (fresh and aged), alfalfa, limestone, and sawdust, which were all collected in close proximity to the construction site of the proposed treatment system. A variety of chemical and physical hypotheses were formulated prior to performing simple chemical characterization and anaerobic treatment tests. The hypotheses relating to the chemical nature of the single materials were carbon to nitrogen ratio, availability of low molecular weight organic acids, number of adsorption sites, and organic carbon content. In addition, hypotheses concerning the performance of mixtures were evaluated by looking at the relative amount of bacterial growth (and metal removal) seen in each mixture over a 4-week period. The results of the laboratory experiments confirmed hypotheses, and demonstrated that in the mixtures, the anaerobic bacteria flourish when alfalfa is present, up to a point. The best mixture that allowed proliferation of bacteria while also removing metals consisted of 50% limestone, 25% aged manure, 15% sawdust, and 10% alfalfa (% by weight).

  20. Laboratory testing during critical care transport: point-of-care testing in air ambulances.

    PubMed

    Di Serio, Francesca; Petronelli, Maria Antonia; Sammartino, Eugenio

    2010-07-01

    Air and ground transport are used for prehospital transport of patients in acute life-threatening situations, and increasingly, critically ill patients undergo interhospital transportation. Results from clinical studies suggest that critical tests performed during the transport of critically ill patients presents a potential opportunity to improve patient care. Our project was to identify, according to the recommendations published at this time, a model of point-of-care testing (POCT) (arterial blood gases analysis and glucose, sodium, potassium, ionized calcium, hematocrit/hemoglobin measurements) in air ambulances. In order to identify the key internal and external factors that are important to achieving our objective, an analysis of the Strengths, Weaknesses, Opportunities, and Threats (SWOT analysis) was incorporated into our planning model prior to starting the project. To allow the entire POCT process (pre-, intra-, and post-analytic steps) to be under the control of the reference laboratory, an experimental model of information technology was applied. Real-time results during transport of critically ill patients must be considered to be an integral part of the patient care process and excellent channels of communication are needed between the intensive care units, emergency medical services and laboratories. With technological and computer advances, POCT during critical care transport will certainly increase in the future: this will be a challenge from a laboratory and clinical context. PMID:20406127

  1. Development of the bus joint for the ITER Central Solenoid

    SciTech Connect

    Martovetsky, Nicolai N; Irick, David Kim; Kenney, Steven J

    2013-01-01

    The terminations of the Central Solenoid (CS) modules are connected to the bus extensions by joints located outside the CS in the gap between the CS and Torodial Field (TF) assemblies. These joints have very strict space limitations. Low resistance is a common requirement for all ITER joints. In addition, the CS bus joints will experience and must be designed to withstand significant variation in the magnetic field of several tenths of a Tesla per second during initiation of plasma. The joint resistance is specified to be less than 4 nOhm. The joints also have to be soldered in the field and designed with the possibility to be installed and dismantled in order to allow cold testing in the cold test facility. We have developed coaxial joints that meet these requirements and have demonstrated the feasibility to fabricate and assemble them in the vertical configuration. We introduced a coupling cylinder with superconducting strands soldered to the surface of the cable that can be installed in the ITER assembly hall and at the Cold Test Facility. This cylinder serves as a transition area between the CS module and the bus extension. We made two racetrack samples and tested four bus joints in our Joint Test Apparatus. Resistance of the bus joints was measured by a decay method and by a microvoltmeter; the value of the current was measured by the Hall probes. This measurement method was verified in the previous tests. The resistance of the joints varied insignificantly from 1.5 to 2 nOhm. One of the challenges associated with a soldered joint is the inability to use corrosive chemicals that are difficult to clean. This paper describes our development work on cable preparation, chrome removal, compaction, soldering, and final assembly and presents the test results.

  2. Settling velocity of marine microplastic particles: laboratory tests

    NASA Astrophysics Data System (ADS)

    Isachenko, Igor; Khatmullina, Lilia; Chubarenko, Irina; Stepanova, Natalia

    2016-04-01

    An assessment of the settling velocity of different classes of microplastic particles (< 5 mm) is crucial for the prediction of their transport and fate. The Reynolds numbers for the settling microplastic particles is usually outside the Stokes range (Re << 1), but still far from fully developed turbulent flow (Re >105). Even for such transitional regime, the settling velocity of the particles that could be treated as more or less smooth spheres can be predicted with high accuracy by relationships available in publications. This is not the case for the non-spherical particles like fibres or flakes. There are quite a large number of quasi-theoretical or semi-empirical approaches that take into account the shape and roughness of the particles, usually in the applications to transport of natural sediments. Some engineering formulas for the settling velocity are also developed which have simpler structure along with high degree of accuracy on the set of experimental data. For marine microplastic particles, the absence of relationship between the settling velocity and the properties of the particle requires testing on the samples of marine microplastics. Besides small fragments of rigid plastic (granules, microbeads), there are also fibres and thin plastic sheets (flakes) with some degree of flexibility. The applicability of available formulae to thin and/or flexible plastic particles again requires verification by experiments. The set of laboratory experiments on settling of microplastic particles of various shapes and excess densities in homogeneous water is reported. The particles were collected in water column, bottom sediments and on the beaches of the South-Eastern Baltic. The experiments demonstrate not just different regimes of motion but different manner of the sinking of spheres, flakes and fibres. The very definition of the "settling velocity" has a specific meaning for every kind of a particle shape. The results of test measurements are compared with

  3. Testing of the Semikron Validation AIPM Unit at Oak Ridge National Laboratory -- October 2004

    SciTech Connect

    Nelson, S.C.

    2004-11-12

    This report documents the electrical tests performed on the Semikron high-voltage automotive integrated power module (AIPM) at Oak Ridge National Laboratory (ORNL). Testing was performed in the 100-hp dynamometer test cell at the National Transportation Research Center.

  4. Results of Laboratory Testing of Advanced Power Strips: Preprint

    SciTech Connect

    Earle, L.; Sparn, B.

    2012-08-01

    This paper describes the results of a laboratory investigation to evaluate the technical performance of advanced power strip (APS) devices when subjected to a range of home entertainment center and home office usage scenarios.

  5. Good laboratory practices for biochemical genetic testing and newborn screening for inherited metabolic disorders.

    PubMed

    2012-04-01

    Biochemical genetic testing and newborn screening are essential laboratory services for the screening, detection, diagnosis, and monitoring of inborn errors of metabolism or inherited metabolic disorders. Under the Clinical Laboratory Improvement Amendments of 1988 (CLIA) regulations, laboratory testing is categorized on the basis of the level of testing complexity as either waived (i.e., from routine regulatory oversight) or nonwaived testing (which includes tests of moderate and high complexity). Laboratories that perform biochemical genetic testing are required by CLIA regulations to meet the general quality systems requirements for nonwaived testing and the personnel requirements for high-complexity testing. Laboratories that perform public health newborn screening are subject to the same CLIA regulations and applicable state requirements. As the number of inherited metabolic diseases that are included in state-based newborn screening programs continues to increase, ensuring the quality of performance and delivery of testing services remains a continuous challenge not only for public health laboratories and other newborn screening facilities but also for biochemical genetic testing laboratories. To help ensure the quality of laboratory testing, CDC collaborated with the Centers for Medicare & Medicaid Services, the Food and Drug Administration, the Health Resources and Services Administration, and the National Institutes of Health to develop guidelines for laboratories to meet CLIA requirements and apply additional quality assurance measures for these areas of genetic testing. This report provides recommendations for good laboratory practices that were developed based on recommendations from the Clinical Laboratory Improvement Advisory Committee, with additional input from the Secretary's Advisory Committee on Genetics, Health, and Society; the Secretary's Advisory Committee on Heritable Disorders in Newborns and Children; and representatives of newborn

  6. 30 CFR 14.21 - Laboratory-scale flame test apparatus.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Laboratory-scale flame test apparatus. 14.21 Section 14.21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING... Technical Requirements § 14.21 Laboratory-scale flame test apparatus. The principal parts of the...

  7. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Production inspections and tests: Independent laboratory... inspections and tests: Independent laboratory's procedures. (a) The manufacturer may follow an independent... production inspection and test requirements of the applicable subpart or are equivalent to those...

  8. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Production inspections and tests: Independent laboratory... inspections and tests: Independent laboratory's procedures. (a) The manufacturer may follow an independent... production inspection and test requirements of the applicable subpart or are equivalent to those...

  9. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests: Independent laboratory... inspections and tests: Independent laboratory's procedures. (a) The manufacturer may follow an independent... production inspection and test requirements of the applicable subpart or are equivalent to those...

  10. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Production inspections and tests: Independent laboratory... inspections and tests: Independent laboratory's procedures. (a) The manufacturer may follow an independent... production inspection and test requirements of the applicable subpart or are equivalent to those...

  11. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Production inspections and tests: Independent laboratory... inspections and tests: Independent laboratory's procedures. (a) The manufacturer may follow an independent... production inspection and test requirements of the applicable subpart or are equivalent to those...

  12. 42 CFR 493.20 - Laboratories performing tests of moderate complexity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... complexity. 493.20 Section 493.20 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF... Provisions § 493.20 Laboratories performing tests of moderate complexity. (a) A laboratory may qualify for a certificate to perform tests of moderate complexity provided that it restricts its test performance to...

  13. An Alternative to the Physiological Psychology Laboratory: Identification of an Unknown Drug Through Behavioral Testing.

    ERIC Educational Resources Information Center

    Schumacher, Susan J.

    1982-01-01

    A laboratory project introduced physiological psychology students to research by requiring them to identify an unknown drug given to laboratory animals. Students read material about drugs and animal drug studies, designed behavioral tests, constructed the testing apparatus, conducted the tests, and wrote progress reports. (SR)

  14. 7 CFR 160.202 - Fees generally for laboratory analysis and testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... variable time for performance, and including other cost factors. The charge for such analysis and testing... 7 Agriculture 3 2013-01-01 2013-01-01 false Fees generally for laboratory analysis and testing... Rendered § 160.202 Fees generally for laboratory analysis and testing. Except as provided in § 160.204,...

  15. 7 CFR 160.202 - Fees generally for laboratory analysis and testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... variable time for performance, and including other cost factors. The charge for such analysis and testing... 7 Agriculture 3 2012-01-01 2012-01-01 false Fees generally for laboratory analysis and testing... Rendered § 160.202 Fees generally for laboratory analysis and testing. Except as provided in § 160.204,...

  16. 7 CFR 160.202 - Fees generally for laboratory analysis and testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... variable time for performance, and including other cost factors. The charge for such analysis and testing... 7 Agriculture 3 2011-01-01 2011-01-01 false Fees generally for laboratory analysis and testing... Rendered § 160.202 Fees generally for laboratory analysis and testing. Except as provided in § 160.204,...

  17. 7 CFR 160.202 - Fees generally for laboratory analysis and testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... variable time for performance, and including other cost factors. The charge for such analysis and testing... 7 Agriculture 3 2014-01-01 2014-01-01 false Fees generally for laboratory analysis and testing... Rendered § 160.202 Fees generally for laboratory analysis and testing. Except as provided in § 160.204,...

  18. BC Transit Fuel Cell Bus Project: Evaluation Results Report

    SciTech Connect

    Eudy, L.; Post, M.

    2014-02-01

    This report evaluates a fuel cell electric bus demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. This evaluation report covers two years of revenue service data on the buses from April 2011 through March 2013.

  19. PEP Support Laboratory Leaching and Permeate Stability Tests

    SciTech Connect

    Russell, Renee L.; Peterson, Reid A.; Rinehart, Donald E.; Buchmiller, William C.

    2009-09-25

    Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes," of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. A simplified flow diagram of the PEP system is shown in Figure 1.1. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP and vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP-VSL-T01A and B, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in

  20. Hydrogen-oxygen driven Zero Emissions bus drives around KSC Visitor Complex

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The Zero Emissions (ZE) transit bus tours the KSC Visitor Complex for a test ride. In the background are a mock-up orbiter named Explorer (left) and a stack of solid rocket boosters and external tank (right), typically used on Shuttle launches. Provided by dbb fuel cell engines inc. of Vancouver, Canada, the ZE bus was brought to KSC as part of the Center's Alternative Fuel Initiatives Program. The bus uses a Proton Exchange Membrane fuel cell in which hydrogen and oxygen, from atmospheric air, react to produce electricity that powers an electric motor drive system. The by-product 'exhaust' from the fuel cell is water vapor, thus zero harmful emissions. A typical diesel-powered bus emits more than a ton of harmful pollutants from its exhaust every year. The ZE bus is being used on tour routes at the KSC Visitor Complex for two days to introduce the public to the concept.

  1. Contribution analysis of bus pass-by noise based on dynamic transfer path method

    NASA Astrophysics Data System (ADS)

    Liu, Haitao; Zheng, Sifa; Hao, Peng; Lian, Xiaomin

    2011-10-01

    Bus pass-by noise has become one of the main noise sources which seriously disturb the mental and physical health of urban residents. The key of reducing bus noise is to identify major noise source. In this paper the dynamic transfer characteristic model in the process of bus acceleration is established, which can quantitatively describe the relationship between the sound source or vibration source of the vehicle and the response points outside the vehicle; also a test method has been designed, which can quickly and easily identify the contribution of the bus pass-by noise. Experimental results show that the dynamic transfer characteristic model can identify the main noise source and their contribution during the acceleration, which has significance for the bus noise reduction.

  2. Use of laboratory test results in patient management by clinicians in Malawi

    PubMed Central

    Moyo, Kundai; Porter, Carol; Chilima, Ben; Mwenda, Reuben; Kabue, Mark; Zungu, Lutho; Sarr, Abdoulaye

    2016-01-01

    Background Malawi has a high burden of infectious disease. The expansion of programmes targeting these diseases requires a strong laboratory infrastructure to support both diagnosis and treatment. Objectives To assess the use of laboratory test results in patient management and to determine the requirements for improving laboratory services. Methods A cross-sectional study was conducted in 2012 to survey practising clinicians. Two hospitals were purposively selected for observations of clinicians ordering laboratory tests. Twelve management-level key informants were interviewed. Descriptive statistics were conducted. Results A total of 242 clinicians were identified and 216 (89%) were interviewed. Of these, 189 (87%) reported doubting laboratory test results at some point. Clinicians most often doubted the quality of haematology (67%), followed by malaria (53%) and CD4 (22%) test results. A total of 151 (70%) clinicians reported using laboratory tests results in patient management. Use of laboratory test results at all times in patient management varied by the type of health facility (P < 0.001). Ninety-one percent of clinicians reported that laboratories required infrastructure improvement. During 97 observations of clinicians’ use of laboratory test results, 80 tests were ordered, and 73 (91%) of these were used in patient management. Key informants reported that the quality of laboratory services was good and useful, but that services were often unavailable. Conclusion Gaps in the public laboratory system were evident. Key recommendations to enhance the use of laboratory test results in patient management were to strengthen the supply chain, reduce turn-around times, improve the test menu and improve the laboratory infrastructure. PMID:27213139

  3. Audio Development Laboratory (ADL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Romero, Andy

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ADL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  4. Sandia National Laboratories Electrochemical Storage System Abuse Test Procedure Manual

    SciTech Connect

    Unkelhaeuser, Terry; Smallwood David

    1999-07-01

    The series of tests described in this report are intended to simulate actual use and abuse conditions and internally initiated failures that may be experienced in electrochemical storage systems (ECSS). These tests were derived from Failure Mode and Effect Analysis, user input, and historical abuse testing. The tests are to provide a common framework for various ECSS technologies. The primary purpose of testing is to gather response information to external/internal inputs. Some tests and/or measurements may not be required for some ECSS technologies and designs if it is demonstrated that a test is not applicable, and the measurements yield no useful information.

  5. Laboratory test and acoustic analysis of cabin treatment for propfan test assessment aircraft

    NASA Technical Reports Server (NTRS)

    Kuntz, H. L.; Gatineau, R. J.

    1991-01-01

    An aircraft cabin acoustic enclosure, built in support of the Propfan Test Assessment (PTA) program, is described. Helmholtz resonators were attached to the cabin trim panels to increase the sidewall transmission loss (TL). Resonators (448) were located between the trim panels and fuselage shell. In addition, 152 resonators were placed between the enclosure and aircraft floors. The 600 resonators were each tuned to a 235 Hz resonance frequency. After flight testing on the PTA aircraft, the enclosure was tested in the Kelly Johnson R and D Center Acoustics Lab. Laboratory noise reduction (NR) test results are discussed. The enclosure was placed in a Gulfstream 2 fuselage section. Broadband (138 dB overall SPL) and tonal (149 dB overall SPL) excitations were used in the lab. Tonal excitation simulated the propfan flight test excitation. The fundamental tone was stepped in 2 Hz intervals from 225 through 245 Hz. The resonators increase the NR of the cabin walls around the resonance frequency of the resonator array. The effects of flanking, sidewall absorption, cabin adsorption, resonator loading of trim panels, and panel vibrations are presented. Increases in NR of up to 11 dB were measured.

  6. 49 CFR Appendix B to Part 219 - Designation of Laboratory for Post-Accident Toxicological Testing

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Designation of Laboratory for Post-Accident.... 219, App. B Appendix B to Part 219—Designation of Laboratory for Post-Accident Toxicological Testing The following laboratory is currently designated to conduct post-accident toxicological analysis...

  7. Tried and True: Tested Ideas for Teaching and Learning from the Regional Educational Laboratories.

    ERIC Educational Resources Information Center

    Levinson, Luna; Stonehill, Robert

    This collection of 16 tested ideas for improving teaching and learning evolved from the work of the 1995 Proven Laboratory Practices Task Force charged with identifying and collecting the best and most useful work from the Regional Educational Laboratories. The Regional Educational Laboratory program is the largest research and development…

  8. Percolation Tests for Septic Systems: A Laboratory Exercise.

    ERIC Educational Resources Information Center

    Tinker, John R., Jr.

    1978-01-01

    Describes how the procedures by which a certificate soil tester evaluates a parcel of land for its suitability as a site for a private sewage system or septic tank can be used by college students as a laboratory exercise in environmental geology. (HM)

  9. FRACTIONAL CRYSALLIZATION LABORATORY TESTS WITH SIMULATED TANK WASTE

    SciTech Connect

    HERTING DL

    2007-11-29

    Results are presented for several simulated waste tests related to development of the fractional crystallization process. Product salt dissolution rates were measured to support pilot plant equipment design. Evaporation tests were performed to evaluate the effects of organics on slurry behavior and to determine optimum antifoam addition levels. A loss-of-power test was performed to support pilot plant accident scenario analysis. Envelope limit tests were done to address variations in feed composition.

  10. Laboratory Evaluation of EGS Shear Stimulation-Test 001

    DOE Data Explorer

    Bauer, Steve

    2014-07-29

    this is the results of an initial setup-shakedon test in order to develop the plumbing system for this test design. a cylinder of granite with offset holes was jacketed and subjected to confining pressure and low temperature (85C) and pore water pressure. flow through the sample was developed at different test stages.

  11. Sorbent Testing for the Solidification of Unidentified Rocky Flats Laboratory Waste Stored at the Idaho National Laboratory

    SciTech Connect

    Bickford, J.; Kimmitt, R.

    2007-07-01

    At the request of the U.S. Department of Energy (DOE), MSE Technology Applications, Inc. (MSE) evaluated various commercially available sorbents to solidify unidentified laboratory liquids from Rocky Flats that are stored at the Idaho National Laboratory (INL). The liquids are a collection of laboratory wastes that were generated from various experiments and routine analytical laboratory activities carried out at Rocky Flats. The liquids are in bottles discovered inside of buried waste drums being exhumed from the subsurface disposal area at the Radioactive Waste Management Complex (RWMC) by the contractor, CH2M Hill Washington International (CWI). Free liquids are unacceptable at the Waste Isolation Pilot Plant (WIPP), and some of these liquids cannot be returned to the retrieval pit. Stabilization of the liquids into a solid mass will allow these materials to be sent to an appropriate disposal location. The selected sorbent or sorbent combinations should produce a stabilized mass that is capable of withstanding conditions similar to those experienced during storage, shipping, and burial. The final wasteform should release less than 1% liquid by volume per the WIPP Waste Acceptance Criteria (WAC). The absence or presence of free liquid in the solidified waste-forms was detected when tested by SW-846, Method 9095B, Paint Filter Free Liquids, and the amount of liquid released from the wasteform was determined by SW-846, Method 9096, Liquid Release Test. Reactivity testing was also conducted on the solidified laboratory liquids. (authors)

  12. Research and development of a phosphoric acid fuel cell/battery power source integrated in a test-bed bus. Final report

    SciTech Connect

    1996-05-30

    This project, the research and development of a phosphoric acid fuel cell/battery power source integrated into test-bed buses, began as a multi-phase U.S. Department of Energy (DOE) project in 1989. Phase I had a goal of developing two competing half-scale (25 kW) brassboard phosphoric acid fuel cell systems. An air-cooled and a liquid-cooled fuel cell system were developed and tested to verify the concept of using a fuel cell and a battery in a hybrid configuration wherein the fuel cell supplies the average power required for operating the vehicle and a battery supplies the `surge` or excess power required for acceleration and hill-climbing. Work done in Phase I determined that the liquid-cooled system offered higher efficiency.

  13. Automated cognitive testing of monkeys in social groups yields results comparable to individual laboratory-based testing.

    PubMed

    Gazes, Regina Paxton; Brown, Emily Kathryn; Basile, Benjamin M; Hampton, Robert R

    2013-05-01

    Cognitive abilities likely evolved in response to specific environmental and social challenges and are therefore expected to be specialized for the life history of each species. Specialized cognitive abilities may be most readily engaged under conditions that approximate the natural environment of the species being studied. While naturalistic environments might therefore have advantages over laboratory settings for cognitive research, it is difficult to conduct certain types of cognitive tests in these settings. We implemented methods for automated cognitive testing of monkeys (Macaca mulatta) in large social groups (Field station) and compared the performance to that of laboratory-housed monkeys (Laboratory). The Field station animals shared access to four touch-screen computers in a large naturalistic social group. Each Field station subject had an RFID chip implanted in each arm for computerized identification and individualized assignment of cognitive tests. The Laboratory group was housed and tested in a typical laboratory setting, with individual access to testing computers in their home cages. Monkeys in both groups voluntarily participated at their own pace for food rewards. We evaluated performance in two visual psychophysics tests, a perceptual classification test, a transitive inference test, and a delayed matching-to-sample memory test. Despite the differences in housing, social environment, age, and sex, monkeys in the two groups performed similarly in all tests. Semi-free ranging monkeys living in complex social environments are therefore viable subjects for cognitive testing designed to take advantage of the unique affordances of naturalistic testing environments. PMID:23263675

  14. Data reproducibility of pace strategy in a laboratory test run

    PubMed Central

    de França, Elias; Xavier, Ana Paula; Hirota, Vinicius Barroso; Côrrea, Sônia Cavalcanti; Caperuto, Érico Chagas

    2016-01-01

    This data paper contains data related to a reproducibility test for running pacing strategy in an intermittent running test until exhaustion. Ten participants underwent a crossover study (test and retest) with an intermittent running test. The test was composed of three-minute sets (at 1 km/h above Onset Blood Lactate Accumulation) until volitional exhaustion. To assess pace strategy change, in the first test participants chose the rest time interval (RTI) between sets (ranging from 30 to 60 s) and in the second test the maximum RTI values were either the RTI chosen in the first test (maximum RTI value), or less if desired. To verify the reproducibility of the test, rating perceived exertion (RPE), heart rate (HR) and blood plasma lactate concentration ([La]p) were collected at rest, immediately after each set and at the end of the tests. As results, RTI, RPE, HR, [La]p and time to exhaustion were not statistically different (p>0.05) between test and retest, as well as they demonstrated good intraclass correlation. PMID:27081672

  15. Data reproducibility of pace strategy in a laboratory test run.

    PubMed

    de França, Elias; Xavier, Ana Paula; Hirota, Vinicius Barroso; Côrrea, Sônia Cavalcanti; Caperuto, Érico Chagas

    2016-06-01

    This data paper contains data related to a reproducibility test for running pacing strategy in an intermittent running test until exhaustion. Ten participants underwent a crossover study (test and retest) with an intermittent running test. The test was composed of three-minute sets (at 1 km/h above Onset Blood Lactate Accumulation) until volitional exhaustion. To assess pace strategy change, in the first test participants chose the rest time interval (RTI) between sets (ranging from 30 to 60 s) and in the second test the maximum RTI values were either the RTI chosen in the first test (maximum RTI value), or less if desired. To verify the reproducibility of the test, rating perceived exertion (RPE), heart rate (HR) and blood plasma lactate concentration ([La]p) were collected at rest, immediately after each set and at the end of the tests. As results, RTI, RPE, HR, [La]p and time to exhaustion were not statistically different (p>0.05) between test and retest, as well as they demonstrated good intraclass correlation. PMID:27081672

  16. 23 CFR 637.209 - Laboratory and sampling and testing personnel qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the FHWA. (3) After June 29, 2000, any non-STD designated laboratory which performs IA sampling and... testing data to be used in the acceptance decision or the IA program shall be executed by qualified... same project: Verification testing, quality control testing, IA testing, or dispute resolution testing....

  17. 23 CFR 637.209 - Laboratory and sampling and testing personnel qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the FHWA. (3) After June 29, 2000, any non-STD designated laboratory which performs IA sampling and... testing data to be used in the acceptance decision or the IA program shall be executed by qualified... same project: Verification testing, quality control testing, IA testing, or dispute resolution testing....

  18. Moving from the laboratory to the field: Adding natural environmental conditions to toxicology testing

    EPA Science Inventory

    While laboratory toxicology tests are generally easy to perform, cost effective and readily interpreted, they have been criticized for being unrealistic. In contrast, field tests are considered realistic while producing results that are difficult to interpret and expensive. To ...

  19. Laboratory tests evaluating the University of South Florida Mobile Data Acquisition System, Type 1

    SciTech Connect

    Kiser, D.M.

    1995-03-01

    The University of South Florida Mobile Data Acquisition System, Version 1, was evaluated in battery laboratory bench tests and in conjunction with laboratory dynamometer tests, for accuracy, ease of operation, and performance. Two tests in each of the two environments are reported. The collected data were also used to evaluate the MDAS data conversion software package XRD10.EXE. Test results show only slightly lower accuracy than results from standard laboratory equipment and data reduction procedures. Additional environmental tests were deferred pending receipt of an improved version of the system.

  20. Materials and Nondestructive Evaluation Laboratoriers: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Schaschl, Leslie

    2011-01-01

    The Materials and Nondestructive Evaluation Laboratory process, milestones and inputs are unknowns to first-time users. The Materials and Nondestructive Evaluation Laboratory Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware developers. It is intended to assist their project engineering personnel in materials analysis planning and execution. Material covered includes a roadmap of the analysis process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define scope of analysis, cost, and schedule are included as an appendix to the guide.

  1. 76 FR 37393 - FY 2011 Discretionary Livability Funding Opportunity; Section 5309 Bus and Bus Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ...The Federal Transit Administration (FTA) announces the availability of discretionary funds in Fiscal Year (FY) 2011 for two programs in support of the Department of Transportation's (DOT) Livability Initiative: the Bus and Bus Facilities grant funds (49 U.S.C. 5309(b)) (``Bus Livability Program'') and the Alternatives Analysis Program (49 U.S.C. 5339), both authorized by the Safe, Accountable,......

  2. 10 CFR 26.153 - Using certified laboratories for testing urine specimens.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-certified laboratories that agree to follow the same rigorous specimen testing, quality control, and chain... written request, have access to the laboratory's records related to his or her validity and drug test and... Federal custody-and-control form, licensees and other entities shall provide a memorandum to...

  3. 10 CFR 26.153 - Using certified laboratories for testing urine specimens.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-certified laboratories that agree to follow the same rigorous specimen testing, quality control, and chain... written request, have access to the laboratory's records related to his or her validity and drug test and... Federal custody-and-control form, licensees and other entities shall provide a memorandum to...

  4. 78 FR 6128 - Agency Information Collection Activities: Accreditation of Commercial Testing Laboratories and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... Commercial Testing Laboratories and Approval of Commercial Gaugers AGENCY: U.S. Customs and Border Protection... collection requirement concerning the Accreditation of Commercial Testing Laboratories and Approval of Commercial Gaugers. This request for comment is being made pursuant to the Paperwork Reduction Act of...

  5. 78 FR 21145 - Agency Information Collection Activities: Accreditation of Commercial Testing Laboratories and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... Register (78 FR 6128) on January 29, 2013, allowing for a 60-day comment period. This notice allows for an... Commercial Testing Laboratories and Approval of Commercial Gaugers AGENCY: U.S. Customs and Border Protection...: Accreditation of Commercial Testing Laboratories and Approval of Commercial Gaugers. This is a...

  6. 42 CFR 493.1467 - Condition: Laboratories performing high complexity testing; cytology general supervisor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... testing; cytology general supervisor. 493.1467 Section 493.1467 Public Health CENTERS FOR MEDICARE....1467 Condition: Laboratories performing high complexity testing; cytology general supervisor. For the subspecialty of cytology, the laboratory must have a general supervisor who meets the...

  7. 42 CFR 493.1467 - Condition: Laboratories performing high complexity testing; cytology general supervisor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... testing; cytology general supervisor. 493.1467 Section 493.1467 Public Health CENTERS FOR MEDICARE....1467 Condition: Laboratories performing high complexity testing; cytology general supervisor. For the subspecialty of cytology, the laboratory must have a general supervisor who meets the...

  8. 42 CFR 493.1467 - Condition: Laboratories performing high complexity testing; cytology general supervisor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... testing; cytology general supervisor. 493.1467 Section 493.1467 Public Health CENTERS FOR MEDICARE....1467 Condition: Laboratories performing high complexity testing; cytology general supervisor. For the subspecialty of cytology, the laboratory must have a general supervisor who meets the...

  9. 42 CFR 493.1467 - Condition: Laboratories performing high complexity testing; cytology general supervisor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... testing; cytology general supervisor. 493.1467 Section 493.1467 Public Health CENTERS FOR MEDICARE....1467 Condition: Laboratories performing high complexity testing; cytology general supervisor. For the subspecialty of cytology, the laboratory must have a general supervisor who meets the...

  10. Idaho National Engineering Laboratory, Test Area North, Hangar 629 -- Photographs, written historical and descriptive data

    SciTech Connect

    1994-12-31

    The report describes the history of the Idaho National Engineering Laboratory`s Hangar 629. The hangar was built to test the possibility of linking jet engine technology with nuclear power. The history of the project is described along with the development and eventual abandonment of the Flight Engine Test hangar. The report contains historical photographs and architectural drawings.

  11. COMPARISON OF P-NITROPHENOL BIODEGRADATION IN FIELD AND LABORATORY TEST SYSTEMS

    EPA Science Inventory

    Acclimation of microbial communities exposed to p-nitrophenol (PNP) was measured in laboratory test systems and in a freshwater pond. Laboratory tests were conducted in shake flasks with water, shake flasks with water and sediment, eco-cores, and two sizes of microcosm. The sedim...

  12. Test and evaluation of an Argonne National Laboratory bulk assay calorimeter

    SciTech Connect

    Rodenburg, W.W.; Fellers, C.L.; Lemming, J.F.

    1981-06-30

    The Argonne National Laboratory bulk assay calorimeter (BAC) was subjected to a series of tests, using plutonium-238 heat standards, to evaluate the performance of the calorimeter over its operating range. The results of these tests provide baseline information of the instrument performance under laboratory conditions.

  13. LABORATORY TOXICITY TESTS FOR EVALUATING POTENTIAL EFFECTS OF ENDOCRINE-DISRUPTING COMPOUNDS

    EPA Science Inventory

    The scope of the Laboratory Testing Work Group was to evaluate methods for testing aquatic and terrestrial invertebrates in the laboratory. Specifically, discussions focused on the following objectives: 1) assess the extent to which consensus-based standard methods and other pub...

  14. 42 CFR 493.1453 - Condition: Laboratories performing high complexity testing; clinical consultant.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... testing; clinical consultant. 493.1453 Section 493.1453 Public Health CENTERS FOR MEDICARE & MEDICAID... Condition: Laboratories performing high complexity testing; clinical consultant. The laboratory must have a clinical consultant who meets the requirements of § 493.1455 of this subpart and provides...

  15. 42 CFR 493.1415 - Condition: Laboratories performing moderate complexity testing; clinical consultant.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... complexity testing; clinical consultant. 493.1415 Section 493.1415 Public Health CENTERS FOR MEDICARE... § 493.1415 Condition: Laboratories performing moderate complexity testing; clinical consultant. The laboratory must have a clinical consultant who meets the qualification requirements of § 493.1417 of...

  16. Tonopah test range - outpost of Sandia National Laboratories

    SciTech Connect

    Johnson, L.

    1996-03-01

    Tonopah Test Range is a unique historic site. Established in 1957 by Sandia Corporation, Tonopah Test Range in Nevada provided an isolated place for the Atomic Energy Commission to test ballistics and non-nuclear features of atomic weapons. It served this and allied purposes well for nearly forty years, contributing immeasurably to a peaceful conclusion to the long arms race remembered as the Cold War. This report is a brief review of historical highlights at Tonopah Test Range. Sandia`s Los Lunas, Salton Sea, Kauai, and Edgewood testing ranges also receive abridged mention. Although Sandia`s test ranges are the subject, the central focus is on the people who managed and operated the range. Comments from historical figures are interspersed through the narrative to establish this perspective, and at the end a few observations concerning the range`s future are provided.

  17. Laboratory Test Utilization Management: General Principles and Applications in Hematopathology.

    PubMed

    Reichard, Kaaren K; Wood, Adam J

    2016-03-01

    As the cost of health care continues to rise and reimbursement rates decrease, there is a growing demand and need to cut overall costs, enhance quality of services, and maintain as a top priority the needs and safety of the patient. In this article, we provide an introduction to test utilization and outline a general approach to creating an efficient, cost-effective test utilization strategy. We also present and discuss 2 test utilization algorithms that are evidence-based and may be of clinical utility as we move toward the future of doing the necessary tests at the right time. PMID:26940264

  18. Testing general relativity in space-borne and astronomical laboratories

    NASA Technical Reports Server (NTRS)

    Will, Clifford M.

    1989-01-01

    The current status of space-based experiments and astronomical observations designed to test the theory of general relativity is surveyed. Consideration is given to tests of post-Newtonian gravity, searches for feeble short-range forces and gravitomagnetism, improved measurements of parameterized post-Newtonian parameter values, explorations of post-Newtonian physics, tests of the Einstein equivalence principle, observational tests of post-Newtonian orbital effects, and efforts to detect quadrupole and dipole radiation damping. Recent numerical results are presented in tables.

  19. Canadian Public Health Laboratory Network laboratory guidelines for the use of direct tests to detect syphilis in Canada.

    PubMed

    Tsang, Raymond Sw; Morshed, Muhammad; Chernesky, Max A; Jayaraman, Gayatri C; Kadkhoda, Kamran

    2015-01-01

    Treponema pallidum subsp. pallidum and/or its nucleic acid can be detected by various methods such as microscopy, rabbit infectivity test or polymerase chain reaction (PCR) tests. The rabbit infectivity test for T. pallidum, although very sensitive, has been discontinued from most laboratories due to ethical issues related to the need for animal inoculation with live T. pallidum, the technically demanding procedure and long turnaround time for results, thus making it impractical for routine diagnostic use. Dark-field and phase-contrast microscopy are still useful at clinic- or hospital-based laboratories for near-bedside detection of T. pallidum in genital, skin or mucous lesions although their availability is decreasing. The lack of reliable and specific anti-T. pallidum antibodies and its inferior sensitivity to PCR may explain why the direct fluorescent antibody test for T. pallidum is not widely available for clinical use. Immunohistochemical staining for T. pallidum also depends on the availability of specific antibodies, and the method is only applicable for histopathological examination of biopsy and autopsy specimens necessitating an invasive specimen collection approach. With recent advances in molecular diagnostics, PCR is considered to be the most reliable, versatile and practical for laboratories to implement. In addition to being an objective and sensitive test for direct detection of Treponema pallidum subsp. pallidum DNA in skin and mucous membrane lesions, the resulting PCR amplicons from selected gene targets can be further characterized for antimicrobial (macrolide) susceptibility testing, strain typing and identification of T. pallidum subspecies. PMID:25798160

  20. Canadian Public Health Laboratory Network laboratory guidelines for the use of direct tests to detect syphilis in Canada

    PubMed Central

    Tsang, Raymond SW; Morshed, Muhammad; Chernesky, Max A; Jayaraman, Gayatri C; Kadkhoda, Kamran

    2015-01-01

    Treponema pallidum subsp. pallidum and/or its nucleic acid can be detected by various methods such as microscopy, rabbit infectivity test or polymerase chain reaction (PCR) tests. The rabbit infectivity test for T. pallidum, although very sensitive, has been discontinued from most laboratories due to ethical issues related to the need for animal inoculation with live T. pallidum, the technically demanding procedure and long turnaround time for results, thus making it impractical for routine diagnostic use. Dark-field and phase-contrast microscopy are still useful at clinic- or hospital-based laboratories for near-bedside detection of T. pallidum in genital, skin or mucous lesions although their availability is decreasing. The lack of reliable and specific anti-T. pallidum antibodies and its inferior sensitivity to PCR may explain why the direct fluorescent antibody test for T. pallidum is not widely available for clinical use. Immunohistochemical staining for T. pallidum also depends on the availability of specific antibodies, and the method is only applicable for histopathological examination of biopsy and autopsy specimens necessitating an invasive specimen collection approach. With recent advances in molecular diagnostics, PCR is considered to be the most reliable, versatile and practical for laboratories to implement. In addition to being an objective and sensitive test for direct detection of Treponema pallidum subsp. pallidum DNA in skin and mucous membrane lesions, the resulting PCR amplicons from selected gene targets can be further characterized for antimicrobial (macrolide) susceptibility testing, strain typing and identification of T. pallidum subspecies. PMID:25798160

  1. Estimating personalized risk ranking using laboratory test and medical knowledge (UMLS).

    PubMed

    Patil, Meru A; Bhaumik, Sandip; Paul, Soubhik; Bissoyi, Swarupananda; Roy, Raj; Ryu, Seungwoo

    2013-01-01

    In this paper, we introduce a Concept Graph Engine (CG-Engine) that generates patient specific personalized disease ranking based on the laboratory test data. CG-Engine uses the Unified Medical Language System database as medical knowledge base. The CG-Engine consists of two concepts namely, a concept graph and its attributes. The concept graph is a two level tree that starts at a laboratory test root node and ends at a disease node. The attributes of concept graph are: Relation types, Semantic types, Number of Sources and Symmetric Information between nodes. These attributes are used to compute the weight between laboratory tests and diseases. The personalized disease ranking is created by aggregating the weights of all the paths connecting between a particular disease and contributing abnormal laboratory tests. The clinical application of CG-Engine improves physician's throughput as it provides the snapshot view of abnormal laboratory tests as well as a personalized disease ranking. PMID:24109927

  2. Test Results From The Idaho National Laboratory 15kW High Temperature Electrolysis Test Facility

    SciTech Connect

    Carl M. Stoots; Keith G. Condie; James E. O'Brien; J. Stephen Herring; Joseph J. Hartvigsen

    2009-07-01

    A 15kW high temperature electrolysis test facility has been developed at the Idaho National Laboratory under the United States Department of Energy Nuclear Hydrogen Initiative. This facility is intended to study the technology readiness of using high temperature solid oxide cells for large scale nuclear powered hydrogen production. It is designed to address larger-scale issues such as thermal management (feed-stock heating, high temperature gas handling, heat recuperation), multiple-stack hot zone design, multiple-stack electrical configurations, etc. Heat recuperation and hydrogen recycle are incorporated into the design. The facility was operated for 1080 hours and successfully demonstrated the largest scale high temperature solid-oxide-based production of hydrogen to date.

  3. 33 CFR 209.340 - Laboratory investigations and materials testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applies to Corps of Engineers Divisions and Districts operating soils, concrete, water quality and... materials testing. 209.340 Section 209.340 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF... materials testing. (a) Purpose. The purpose of this section is to define and establish policies...

  4. 33 CFR 209.340 - Laboratory investigations and materials testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applies to Corps of Engineers Divisions and Districts operating soils, concrete, water quality and... materials testing. 209.340 Section 209.340 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF... materials testing. (a) Purpose. The purpose of this section is to define and establish policies...

  5. Efficacy of inorganic compounds against soybean aphid, laboratory tests 2012

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Infestations by soybean aphids can reduce the yield of soybeans, and the efficacies of various compounds need evaluation for soybean aphid control. Efficacy of various inorganic compounds was compared to that of a water check and conventional insecticides in two growth-chamber tests. Soybean test ...

  6. PEP Support: Laboratory Scale Leaching and Permeate Stability Tests

    SciTech Connect

    Russell, Renee L.; Peterson, Reid A.; Rinehart, Donald E.; Buchmiller, William C.

    2010-05-21

    This report documents results from a variety of activities requested by the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The activities related to caustic leaching, oxidative leaching, permeate precipitation behavior of waste as well as chromium (Cr) leaching are: • Model Input Boehmite Leaching Tests • Pretreatment Engineering Platform (PEP) Support Leaching Tests • PEP Parallel Leaching Tests • Precipitation Study Results • Cr Caustic and Oxidative Leaching Tests. Leaching test activities using the PEP simulant provided input to a boehmite dissolution model and determined the effect of temperature on mass loss during caustic leaching, the reaction rate constant for the boehmite dissolution, and the effect of aeration in enhancing the chromium dissolution during caustic leaching. Other tests were performed in parallel with the PEP tests to support the development of scaling factors for caustic and oxidative leaching. Another study determined if precipitate formed in the wash solution after the caustic leach in the PEP. Finally, the leaching characteristics of different chromium compounds under different conditions were examined to determine the best one to use in further testing.

  7. Synthesis and Testing of the Insecticide Carbaryl: A Laboratory Experiment.

    ERIC Educational Resources Information Center

    Thadeo, Peter F.; Mowery, Dwight F.

    1984-01-01

    Carbaryl, 1-naphthyl-N-methylcarbamate, is the biodegradable (soft) insecticide most commonly marketed by the Union Carbide Corporation under the trade name of Sevin. Procedures for the synthesis and testing of carbaryl and for the testing of some compounds similar to carbaryl are provided. Equations showing its synthesis from methyl isocyanate…

  8. 7 CFR 58.442 - Laboratory and quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... analyses—(1) Milkfat and moisture. One sample shall be tested from each vat of the finished cheese to assure compliance with composition requirements. (2) Test method. Chemical analysis shall be made in accordance with the methods described in Official Methods of Analysis of the Association of...

  9. The effect of physician personality on laboratory test ordering for hypertensive patients.

    PubMed

    Ornstein, S M; Markert, G P; Johnson, A H; Rust, P F; Afrin, L B

    1988-06-01

    Laboratory tests are responsible for a large percentage of health care expenses in the United States. In a retrospective study of the outpatient test ordering by residents for hypertensive patients between the years 1980 and 1986 at the Department of Family Medicine at the Medical University of South Carolina, we found great variability in laboratory test ordering as well as an association between personality as measured by the Myers-Briggs Type Indicator (MBTI) and test ordering. Introverts ordered more than extroverts, and intuitives ordered more than sensors. This association was confirmed by a multiple regression analysis controlling for potential confounders of test ordering, such as severity of disease, the presence of coexisting diabetes mellitus, the demographic characteristics of the patient population, and the number of initial evaluations for hypertension. Elucidation of a relationship between resident personality and laboratory test ordering has important implications for planning intervention strategies to reduce excessive laboratory test ordering in ambulatory care. PMID:3379985

  10. NREL Showcases Hydrogen Internal Combustion Engine Bus, Helps DOE Set Standards for Outreach (Fact Sheet)

    SciTech Connect

    Not Available

    2010-11-01

    This fact sheet describes the National Renewable Energy Laboratory's (NREL's) accomplishments in showcasing a Ford hydrogen-powered internal combustion engine (H2ICE) bus at The Taste of Colorado festival in Denver. NREL started using its U.S. Department of Energy-funded H2ICE bus in May 2010 as the primary shuttle vehicle for VIP visitors, members of the media, and new employees. In September 2010, NREL featured the bus at The Taste of Colorado. This was the first major outreach event for the bus. NREL's educational brochure, vehicle wrap designs, and outreach efforts serve as a model for other organizations with DOE-funded H2ICE buses. Work was performed by the Hydrogen Education Group and Market Transformation Group in the Hydrogen Technologies and Systems Center.

  11. Road safety issues for bus transport management.

    PubMed

    Cafiso, Salvatore; Di Graziano, Alessandro; Pappalardo, Giuseppina

    2013-11-01

    Because of the low percentage of crashes involving buses and the assumption that public transport improves road safety by reducing vehicular traffic, public interest in bus safety is not as great as that in the safety of other types of vehicles. It is possible that less attention is paid to the significance of crashes involving buses because the safety level of bus systems is considered to be adequate. The purpose of this study was to evaluate the knowledge and perceptions of bus managers with respect to safety issues and the potential effectiveness of various technologies in achieving higher safety standards. Bus managers were asked to give their opinions on safety issues related to drivers (training, skills, performance evaluation and behaviour), vehicles (maintenance and advanced devices) and roads (road and traffic safety issues) in response to a research survey. Kendall's algorithm was used to evaluate the level of concordance. The results showed that the majority of the proposed items were considered to have great potential for improving bus safety. The data indicated that in the experience of the participants, passenger unloading and pedestrians crossing near bus stops are the most dangerous actions with respect to vulnerable users. The final results of the investigation showed that start inhibition, automatic door opening, and the materials and internal architecture of buses were considered the items most strongly related to bus passenger safety. Brake assistance and vehicle monitoring systems were also considered to be very effective. With the exception of driver assistance systems for passenger and pedestrian safety, the perceptions of the importance of other driver assistance systems for vehicle monitoring and bus safety were not unanimous among the bus company managers who participated in this survey. The study results showed that the introduction of new technologies is perceived as an important factor in improving bus safety, but a better understanding

  12. [Ayurvedics drugs in France. Laboratories polytherapic, a test].

    PubMed

    Raynal, Cécile; Lefebvre, Thierry

    2011-02-01

    In the beginning of the thirties, Dr Jean Saidman, who has already created a rotative solarium at Aix-les-Bains, built another one in Jamnagar (India). When he was there, he discovered ayurvedic therapy. After the Second World War, with his friends Dr Rémus Krainik and the chemist René-Henri Monceaux, he set up a "néo-ayurvedic action committee", and then a pharmaceutical laboratory, "Polythérapic", to export to french colonies patents medicines inspired by indian medicine. The authors tale this experience suddenly stopped by the unexpected death of Jean Saidman, in 1949. PMID:21661222

  13. The passive autocatalytic recombiner test program at Sandia National Laboratories

    SciTech Connect

    Blanchat, T.K.; Malliakos, A.

    1997-10-01

    Passive autocatalytic recombiners (PARs) are being considered by the nuclear power industry as a combustible gas control system in operating plants and advanced light water reactor (ALWR) containments for design basis events. Sandia National Laboratories (SNL) has developed systems and methodologies to measure the amount of hydrogen that can be depleted in a containment by a PAR. Experiments were performed that determined the hydrogen depletion rate of a PAR in the presence of steam and also evaluated the effect of scale (number of cartridges) on the PAR performance at both low and high hydrogen concentrations.

  14. A new bus lane on urban expressway with no-bay bus stop

    NASA Astrophysics Data System (ADS)

    Tian, Zhao; Jia, Limin

    2016-01-01

    The sharp increase in residents and vehicles causes heavy traffic pressure in many cities. To ease traffic congestion, it has been the common sense that we should develop public transit system. The priority of the bus appears particularly necessary with the rapid development of the public transport system. The bus lane is an important embodiment of the bus priority. Focusing on the problem of the unreasonable dedicated bus lane (DBL) under the lower ratio of buses, this paper proposed a new bus lane with limited physical length. And this bus lane can reduce the lane-changing conflict caused by the buses and cars running on roads without bus lanes. Based on the cellular automata (CA) traffic flow model and the lane-changing behavior of the vehicle including the optional lane-changing and the mandatory lane-changing, a three-lane traffic model with an isolated no-bay bus stop is proposed. The ordinary three-lane traffic without a bus lane and the cases of traffic with a DBL or the proposed bus lane are simulated, and the comparisons in the form of the fundamental diagrams are made among them. It is shown that the no-bay bus stop can act as a bottleneck on the traffic flow because of the mandatory lane-changing behavior. Under a certain ratio of the bus number to the total vehicles number, (1) the traffic with the proposed bus lane has less lane-changing conflict and can provide higher traffic capacity than the ordinary traffic without a bus lane, (2) compared with the DBL, the proposed bus lane is advantageous in easing congestion on the ordinary lanes when the traffic flow is high and can avoid unreasonable allocation of the road resources.

  15. Novel low cost standardized Nano-Satellite structure bus for LEO missions

    NASA Astrophysics Data System (ADS)

    Anubhav, T.; Sarwesh, P.; Narayan, V.; Varma, P. A.; Prasad, R. A.; Loganathan, M.; Rao, D. N.; Sriram, S.; Venkatesh, M.

    This paper focuses on SRMSAT STRUCTURE BUS which is a standardized Nano-Satellite structure bus. It provides a standard platform for a wide variety of missions in LEO and can be realized in a very short developmental period. The bus was designed and developed for SRMSAT, the SRM University (Sri Ramaswamy Memorial University) student Nano-Satellite, by the undergraduate students and faculty of SRM University in collaboration with Indian Space Research Organization (ISRO). The bus can support payloads up to a mass of 20kg. SRMSAT STRUCTURE BUS has a mass of around 6 kg and dimensions 280mm × 280mm × 280mm with an available volume of 11000 cc. Vibration Testing of the bus has been performed upto 6.7 gRMS. This makes the satellite capable of being launched by any launch vehicle in the world. An innovative PCB mounting design has been introduced in this structure bus which facilitates mounting of a maximum 7 PCB trays independently, each tray capable of holding a 250 mm2 PCB. Structural analysis of SRMSAT STRUCTURE BUS was done using NX Nastran. The boundary conditions for each analysis were defined based on the loading conditions as specified by the launcher, PSLV (Polar Satellite Launch Vehicle). Optimization of each individual component was performed by maintaining a minimum threshold between the local frequencies of the component and global frequencies of the entire satellite. Static, Modal, Harmonic and Random Vibration analysis of the structure bus was performed. This paper also describes the methodology followed in the static and dynamic analysis of the structure bus to finalize the design. The results have been tested and validated at ISRO Satellite Centre, Bangalore with around 90% accuracy and the structure has been certified as a standard structure bus for Nano-satellite missions. In terms of expandability, this structure bus is capable of accommodating deployable solar panels. Also, the payload mounting is not only restricted to th- bottom deck but can

  16. Assessing Perceived Challenges to Laboratory Testing at a Malawian Referral Hospital.

    PubMed

    Petrose, Lia G; Fisher, Arielle M; Douglas, Gerald P; Terry, Martha A; Muula, Adamson; Chawani, Marlen S; Limula, Henry; Driessen, Julia

    2016-06-01

    Adequate laboratory infrastructure in sub-Saharan Africa is vital for tackling the burden of infectious diseases such as human immunodeficiency virus and acquired immune deficiency syndrome, malaria, and tuberculosis, yet laboratories are ill-integrated into the diagnostic and care delivery process in low-resource settings. Although much of the literature focuses on disease-specific challenges around laboratory testing, we sought to identify horizontal challenges to the laboratory testing process through interviews with clinicians involved in the diagnostic process. Based on 22 interviews with physicians, nurses, clinical officers, medical students, and laboratory technicians, technologists and supervisors, we identified 12 distinct challenges in the areas of staff, materials, workflow, and the blood bank. These challenges underscore the informational challenges that compound more visible resource shortages in the laboratory testing process, which lend themselves to horizontal strengthening efforts around the diagnostic process. PMID:27022150

  17. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... satisfactory composition, shelf-life and stability. (b) Frequency of sampling—(1) Microbiological. Samples of...) Test methods—(1) Microbiological. Microbiological determinations shall be made for coliform... Public Health Association. (2) Chemical. Chemical analysis shall be made in accordance with the...

  18. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... satisfactory composition, shelf-life and stability. (b) Frequency of sampling—(1) Microbiological. Samples of...) Test methods—(1) Microbiological. Microbiological determinations shall be made for coliform... Public Health Association. (2) Chemical. Chemical analysis shall be made in accordance with the...

  19. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... satisfactory composition, shelf-life and stability. (b) Frequency of sampling—(1) Microbiological. Samples of...) Test methods—(1) Microbiological. Microbiological determinations shall be made for coliform... Public Health Association. (2) Chemical. Chemical analysis shall be made in accordance with the...

  20. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the finished product. Routine analyses shall be made on raw materials and finished product to assure... raw milk for testing shall be taken as prescribed in § 58.135. Representative samples shall be...