Science.gov

Sample records for commission impacto das

  1. Commissioning

    SciTech Connect

    Huta, L.G.

    1995-12-01

    Building managers often find that HVAC, lighting and other systems in new buildings need adjustments and modifications. The owner, architect and contractor may mistakenly assume that all of a building`s systems--architectural, mechanical, control and electrical--function according to the design intent. Thus, energy managers can optimize their building`s performance through commissioning, a process that looks for and corrects the defects in a building` operating system or design, immediately before and after it is occupied (following construction or renovation).

  2. Commissioning MMS

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  3. DAS performance analysis

    SciTech Connect

    Bates, G.; Bodine, S.; Carroll, T.; Keller, M.

    1984-02-01

    This report begins with an overview of the Data Acquisition System (DAS), which supports several of PPPL's experimental devices. Performance measurements which were taken on DAS and the tools used to make them are then described.

  4. Economic Commission Report

    ERIC Educational Resources Information Center

    American Indian Journal, 1977

    1977-01-01

    Summarizing presentations and discussions of the Economic Commission of the International Non-Governmental Organizations Conference on Discrimination Against Indigenous Populations (1977), this report addresses: multinational corporations; the land question; and the Commission's recommended "Plan of Action". (JC)

  5. Commissioning HVAC systems

    SciTech Connect

    Schiess, K.

    1995-12-01

    In recent years, commissioning has been viewed as a separate process that had to be specified and implemented by a specialized entity. This article discusses commissioning in the HVAC field and looks at it from an international perspective. The author has worked in Europe, South Africa (British system) and the USA. The differences between the British and the American methods of commissioning are discussed, with examples given where the American way was unsuccessful. It is the design engineer`s job to test and accept (commission) an installation after the contractor has demonstrated the performance to the satisfaction of the design engineer. Once the plant is commissioned, it is put into service.

  6. Guidelines for residential commissioning

    SciTech Connect

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  7. THE COLLEGE COMMISSIONS.

    ERIC Educational Resources Information Center

    FOOKS, JOYCE LANE

    THE HISTORIES, ORGANIZATIONAL STRUCTURES, MODES OF OPERATION, GOALS, AND SPECIFIC ACTIVITIES OF EIGHT COLLEGE SCIENCE COMMISSIONS ARE PRESENTED. THE GOAL OF THE EIGHT COLLEGE SCIENCE COMMISSIONS IS TO BRING UNDERGRADUATE SCIENCE INSTRUCTION CLOSER TO THE RESEARCH FRONTIER, UPDATE COURSES, AND FOSTER THE SPIRIT OF INQUIRY. INTERCOMMISSION…

  8. Commissioning of HVAC systems

    SciTech Connect

    Schiess, K.

    1995-06-01

    In recent years various presentation and discussions have taken place which looked at commissioning as a separate process that had to be specified and implemented by a specialized entity in a project. This presentation discusses commissioning in the HVAC field and looks at it from an international perspective. The author has worked in Europe, South Africa (British system) and in the USA. The differences are discussed between the British and the American methods with some examples where the American way of commissioning was unsuccessful. The conclusion is that it is the design engineer`s job to test and accept (commission) an installation after the contractor has demonstrated the performance to the satisfaction of the design engineer. Once the plant is commissioned, it is put into service.

  9. Nuclear Regulatory Commission issuances

    SciTech Connect

    Not Available

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  10. Federal Trade Commission

    MedlinePlus

    ... Events Press Releases Commission Actions Media Resources Consumer Finance Mergers and Competition Mobile Technology The Do Not ... Advice For Consumers Business Center Advertising & Marketing Credit & Finance Guidance Privacy & Security Selected Industries Legal Resources Business ...

  11. Commissioning the LCLS Injector

    SciTech Connect

    Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Iverson, R.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Schmerge, J.; Turner, J.; Welch, J.; White, W.; Wu, J.; /SLAC

    2007-11-28

    The Linac Coherent Light Source (LCLS) is a SASE x-ray Free-Electron Laser (FEL) project presently under construction at SLAC. The injector section, from drive laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam was completed in August 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch clearly demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photo-cathode drive laser, RF gun, photocathode, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  12. Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  13. Commission 53: Extrasolar Planets

    NASA Astrophysics Data System (ADS)

    Boss, Alan; Lecavelier des Etangs, Alain; Mayor, Michel; Bodenheimer, Peter; Collier-Cameron, Andrew; Kokubo, Eiichiro; Mardling, Rosemary; Minniti, Dante; Queloz, Didier

    2012-04-01

    Commission 53 was created at the 2006 Prague General Assembly (GA) of the IAU, in recognition of the outburst of astronomical progress in the field of extrasolar planet discovery, characterization, and theoretical work that has occurred since the discovery of the first planet in orbit around a solar-type star in 1995. Commission 53 is the logical successor to the IAU Working Group on Extrasolar Planets (WGESP), which ended its six years of existence in August 2006. The founding President of Commission 53 was Michael Mayor, in honor of his seminal contributions to this new field of astronomy. The current President is Alan Boss, the former chair of the WGESP. The current members of the Commission 53 (C53) Organizing Committee (OC) began their service in August 2009 at the conclusion of the Rio de Janeiro IAU GA.

  14. Commission 4: Ephemerides

    NASA Astrophysics Data System (ADS)

    Fukushima, Toshio; Kaplan, George H.; Krasinsky, George A.; Arlot, Jean-Eudes; Bangert, John A.; Hohenkerk, Catherine; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrak, Jan

    2010-05-01

    Dr. George Kaplan, the current Vice-President of the Commission was nominated to be the new President. Dr. Catherine Hohenkerk was elected to be the next Vice-President of the Commission. As for the Membership of the Organizing Committee, Dr. Vondrak stepped down and Drs William Folkner of JPL and Steve Bell of HMNAO have been added. In the below, we present summaries of the reports from various institutions presented at the business session.

  15. SPEAR3 Commissioning

    SciTech Connect

    Harkay, K.; Sajaev, V.; Boland, M.J.; Tan, Y.E.; Krinsky, S.; Podobedov, B.; Decking, W.; Ropert, A.; Byrd, J.M.; Robin, D.; Scarvie, T.; Steier, C.; Fedurin, M.G.; Jines, P.; Chang, H.-P.; Kuo, C.-C.; Tsai, H.-J.; Yoon, M.H.; Boge, M.; Allison, S.; Bellomo, P.; /SLAC, SSRL /SOLEIL, Saint-Aubin

    2005-05-09

    The successful commissioning of the new SPEAR3 light source at the Stanford Synchrotron Radiation Laboratory (SSRL) will be reviewed. Orbit control, beam-based alignment, and an orbit interlock were commissioned. Orbit motion was characterized as a function of frequency. The linear optics was corrected for ID focusing and coupling errors. The nonlinear optics were investigated with dynamic aperture measurements as a function of energy and tune.

  16. 77 FR 10599 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... conducted by the Commission on February 16, 2012; notice of which was published in 77 FR 3321, January 23... COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on March 15, 2012, in...

  17. Das DNA-Puzzle

    NASA Astrophysics Data System (ADS)

    Kirchner, Stefan

    Im Jahre 1953 wurde von James Watson und Francis Crick erstmalig der strukturelle Aufbau der sogenannten DNA (Desoxyribonukleinsäure) beschrieben, welche das Erbgut jedes Lebewesens enthält. Der wesentliche Teil des Erbguts wird dabei durch eine sehr lange Folge der vier Basen Adenin (A), Cytosin (C), Guanin (G) und Thymin (T) codiert. Seit einigen Jahren ist es möglich, die Folge der vier Basen zu einer gegebenen DNA zu bestimmen. Biologen bezeichnen diesen Vorgang als Sequenzierung.

  18. Commissioning Experience of SNS

    SciTech Connect

    Plum, Michael A

    2007-07-01

    The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H{sup -} front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs in January-February and April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including emittance evolution, transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS linac will be presented.

  19. Commission 42: Close Binaries

    NASA Astrophysics Data System (ADS)

    Giménez, Alvaro; Rucinski, Slavek; Szkody, P.; Gies, D.; Kang, Y.-W.; Linsky, J.; Livio, M.; Morrell, N.; Hilditch, R.; Nordström, B.; Ribas, I.; Sion, E.; Vrielman, S.

    2007-03-01

    The triennial report from Commission 42 covers various topics like massive binaries, contact systems, cataclysmic variables and low-mass binary stars. We try in a number of sections to provide an update on the current status of the main research areas in the field of close binaries. It is not a formal review, even complete or comprehensive, but an attempt to bring the main topics on recent research to astronomers working in other fields. References are also not comprehensive and simply added to the text to help the reader looking for deeper information on the subject. For this reason, we have chosen to include references (sometimes incomplete for ongoing work) not in a list at the end but integrated with the main text body. Complete references and additional sources can be easily obtained through web access of ADS or SIMBAD. Furthermore, the summary of papers on close-binary research contained in the Bibliography of Close Binaries (BCB) can be accessed from the web site of Commission 42. I would like to express the gratitude of the commission for the careful work of Colin Scarfe as Editor-in-Chief of BCB and Andras Holl and Attila Sragli for maintaining the web pages of the Commission within the structure of Division V. Finally, K. Olah and J. Jurcsik are gratefully acknowledged for their continued support as editors of the Information Bulletin on Variable Stars (IBVS), also accessible through the commission web page.

  20. Commissioning of CEBAF

    SciTech Connect

    Andrew Hutton

    1994-06-01

    Construction of the CEBAF accelerator, a 4 GeV CW recirculating linac, is virtually complete. The 338 power sources and superconducting RF cavities, which have all run above nominal operating gradient in vertical tests (average 10.7 MeV/m), are installed. All the major components of the nine recirculation arcs are installed and aligned. Pre-commissioning was performed in parallel with construction. Ninety-nine superconducting cavities were operated simultaneously at the nominal gradient of 5 MeV/m. A maximum beam current of 110 PA CW (ZOO PA design) was reached. A cryomodule with eight cavities has operated at 8 MeV/m. Commissioning of the entire machine began in May 94. Results obtained during commissioning of the two linacs and the first arc are presented. 600 MeV beam is ready to be brought to the first experimental hall meeting a DOE milestone established in 1988.

  1. ATF2 Commissioning

    SciTech Connect

    Seryi, A.; Christian, G.; Parker, B.; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; Wolski, A.; Elsen, E.; Sanuki, T.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; Takahashi, T.; Bai, S.; Gao, J.; Bolzon, B.; Geffroy, N.; Jeremie, A.; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  2. Conservation Commissions in Massachusetts.

    ERIC Educational Resources Information Center

    Scheffey, Andrew J. W.

    The Conservation Foundation reported on the experience of a resource development specialist in the state of Massachusetts on the public's growing concern for environmental quality. After tracing the origins of the Massachusetts movement, the report draws upon a variety of specific state experiences to illustrate the commission's growing pains and…

  3. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  4. Nuclear Regulatory Commission Issuances

    SciTech Connect

    Not Available

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  5. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  6. SPEAR 3 Commissioning Software

    SciTech Connect

    Corbett, W.J.; Portmann, G.J.; Safranek, J.A.; Terebilo, A.; /SLAC, SSRL

    2005-05-09

    The short SPEAR 3 startup time required precommissioned software for machine setup, beam measurements and data analysis. To accomplish this goal, we used Matlab with the Accelerator Toolbox (AT), the Channel Access Toolbox (MCA) and Middle Layer software to integrate code and streamline production. This paper outlines the software architecture, describes the Middle Layer component and provides examples from SPEAR 3 commissioning.

  7. 77 FR 28420 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... the notice for such hearing, which was published in 77 FR 23319, April 18, 2012. Authority: Pub. L. 91... COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on June 7, 2012, in Binghamton,...

  8. 78 FR 52601 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... on August 15, 2013, and identified in the notice for such hearing, which was published in 78 FR 43961... COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on September 19, 2013, in...

  9. 78 FR 12412 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Commission on February 14, 2013, and identified in the notice for such hearing, which was published in 78 FR... From the Federal Register Online via the Government Publishing Office ] SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY:...

  10. 77 FR 70204 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Commission on November 15, 2012, and identified in the notice for such hearing, which was published in 77 FR... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY:...

  11. Commissioning the Majorana Demonstrator

    NASA Astrophysics Data System (ADS)

    Xu, Wenqin; Majorana Collaboration

    2016-03-01

    The Majorana Demonstrator deploys high purity germanium (HPGe) detector modules to search for neutrinoless double beta (0 νββ) decay in 76Ge. The experiment is aimed at demonstrating the technical feasibility and low backgrounds for a next generation Ge-based BBz experiment. The program of testing and commissioning the Demonstrator modules is a critical step to debug and improve the experimental apparatus, to establish and refine operational procedures, and to develop data analysis tools. In this talk, we will discuss our experience commissioning the Demonstrator modules and show how this program leads to successful data-taking. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics, the Particle Astrophysics and Nuclear Physics Programs of the National Science Foundation, and the Sanford Underground Research Facility.

  12. Correction: AIDS commission.

    PubMed

    1987-11-01

    A recent article by William Booth on the President's AIDS commission (News & Comment, 16 Oct., p. 262) incorrectly states that commission member Cory SerVaas, publisher of the Saturday Evening Post, drives her AIDS Mobile around the country. SerVaas does not drive the traveling van that offers free AIDS testing. Rather, she often flies to meet it as it travels around the country, stopping at shopping malls and churches by prearrangement with local civic and religious groups. SerVaas denies saying that homosexuals are "deviants." "We have helped homosexuals for many years," she says, pointing out that although her group primarily tests people who have a low risk of being infected, such as recipients of blood transfusions and women who may become pregnant, members of high-risk groups such as homosexuals and drug addicts are not excluded. PMID:17814691

  13. Commission 42: Close Binaries

    NASA Astrophysics Data System (ADS)

    Rucinski, Slavek M.; Ribas, Ignasi; Giménez, Alvaro; Harmanec, Petr; Hilditch, Ronald W.; Kaluzny, Janusz; Niarchos, Panayiotis; Nordström, Birgitta; Oláh, Katalin; Richards, Mercedes T.; Scarfe, Colin D.; Sion, Edward M.; Torres, Guillermo; Vrielmann, Sonja

    2010-05-01

    During the commission business session, the past President presented the new Organizing Committee which was selected by the OC through a e-mail vote conducted during the months before the Rio de Janeiro General Assembly. The new OC will consist of Ignasi Ribas (President), Mercedes Richards (Vice President), and Slavek Rucinski (Past President) with the members: David Bradstreet, Petr Harmanec, Janusz Kaluzny, Joanna Mikolajewska, Ulisse Munari, Panos Niarchos, Katalin Olah, Theo Pribulla, Colin Scarfe and Guillermo Torres.

  14. Nuclear Regulatory Commission issuances

    SciTech Connect

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  15. Securities and Exchange Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... [Securities and Exchange Commission Semiannual Regulatory Agenda ] Part XXIII Securities and Exchange Commission Semiannual Regulatory Agenda ] SECURITIES AND EXCHANGE COMMISSION (SEC) SECURITIES AND EXCHANGE COMMISSION 17 CFR Ch. II Regulatory Flexibility Agenda AGENCY: Securities and Exchange Commission. ACTION: Semiannual regulatory...

  16. Commission 31: Time

    NASA Astrophysics Data System (ADS)

    Defraigne, Pascale; Manchester, Richard; Matsakis, Demetrios; Petit, Gerard; Hosokawa, Mizuhiko; Leschiutta, Sigfrid; Zhai, Zao-Cheng

    2010-05-01

    Dr R. N. Manchester and Dr M. Hosokawa have been elected as, respectively, the new President and Vice-President of the Commission for the next term, 2009-2012. Concerning the Organizing Committee (OC) Members, we welcome as new members: Felicitas Aris (BIPM, France), Philip Tuckey (LNE-SYRTE, France), Vladimir Zharov (MSU, Russia), and Shougang Zhang (NTSC, China) and we acknowledge the outgoing members: Demetrios Matsakis, Gerard Petit, Mizuhiko Hosokawa, Sigfrid Leschiutta and Zao-Cheng Zhai. P. Defraigne remains on the OC as immediate Past-President.

  17. Nuclear Regulatory Commission information digest

    SciTech Connect

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  18. A Guide to Building Commissioning

    SciTech Connect

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  19. Connecting the Dots in DAS

    ERIC Educational Resources Information Center

    Ford, Tracy

    2012-01-01

    Many institutions implement a distributed antenna system (DAS) as part of a holistic approach to providing better wireless coverage and capacity on campus. A DAS provides wireless service within a particular area or structure via a network of separate antenna nodes that are connected to a common source through fiber or coaxial cable. Because DAS…

  20. 78 FR 32295 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ... notice for such hearing, which was published in 78 FR 24785, April 26, 2013. Please note that the... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY:...

  1. Future of multistate regional commissions

    SciTech Connect

    Newman, M.

    1980-04-01

    Multistate regional commissions in the United States have been used since 1965. The largest program has been that of the Appalachian Regional Commission (ARC). Institutional and financial barriers have been the most difficult problems encountered by the ARC and other programs (such as Title V commissions). Despite the imperfect performance of the existing regional commissions, they offer a demonstration that some improvement in governmental performance can be achieved. There is virtual unanimity among the nation's governors that this is the route for Federal state relations to follow. Also, the commission route is viewed privately as the most socially acceptable means to have a beneficial impact on government performance. (SAC)

  2. Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    Klimchuk, James A.; van Driel-Gesztelyi, Lidia; Schrijver, Carolus J.; Melrose, Donald B.; Fletcher, Lyndsay; Gopalswamy, Natchimuthuk; Harrison, Richard A.; Mandrini, Cristina H.; Peter, Hardi; Tsuneta, Saku; Vršnak, Bojan; Wang, Jing-Xiu

    Commission 10 deals with solar activity in all of its forms, ranging from the smallest nanoflares to the largest coronal mass ejections. This report reviews scientific progress over the roughly two-year period ending in the middle of 2008. This has been an exciting time in solar physics, highlighted by the launches of the Hinode and STEREO missions late in 2006. The report is reasonably comprehensive, though it is far from exhaustive. Limited space prevents the inclusion of many significant results. The report is divided into the following sections: Photosphere and chromosphere; Transition region; Corona and coronal heating; Coronal jets; flares; Coronal mass ejection initiation; Global coronal waves and shocks; Coronal dimming; The link between low coronal CME signatures and magnetic clouds; Coronal mass ejections in the heliosphere; and Coronal mass ejections and space weather. Primary authorship is indicated at the beginning of each section.

  3. Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    van Driel-Gesztelyi, Lidia; Schrijver, Carolus J.; Klimchuk, James A.; Charbonneau, Paul; Fletcher, Lyndsay; Hasan, S. Sirajul; Hudson, Hugh S.; Kusano, Kanya; Mandrini, Cristina H.; Peter, Hardi; Vršnak, Bojan; Yan, Yihua

    2012-04-01

    Commission 10 of the International Astronomical Union has more than 650 members who study a wide range of activity phenomena produced by our nearest star, the Sun. Solar activity is intrinsically related to solar magnetic fields and encompasses events from the smallest energy releases (nano- or even picoflares) to the largest eruptions in the Solar System, coronal mass ejections (CMEs), which propagate into the Heliosphere reaching the Earth and beyond. Solar activity is manifested in the appearance of sunspot groups or active regions, which are the principal sources of activity phenomena from the emergence of their magnetic flux through their dispersion and decay. The period 2008-2009 saw an unanticipated extended solar cycle minimum and unprecedentedly weak polar-cap and heliospheric field. Associated with that was the 2009 historical maximum in galactic cosmic rays flux since measurements begun in the middle of the 20th Century. Since then Cycle 24 has re-started solar activity producing some spectacular eruptions observed with a fleet of spacecraft and ground-based facilities. In the last triennium major advances in our knowledge and understanding of solar activity were due to continuing success of space missions as SOHO, Hinode, RHESSI and the twin STEREO spacecraft, further enriched by the breathtaking images of the solar atmosphere produced by the Solar Dynamic Observatory (SDO) launched on 11 February 2010 in the framework of NASA's Living with a Star program. In August 2012, at the time of the IAU General Assembly in Beijing when the mandate of this Commission ends, we will be in the unique position to have for the first time a full 3-D view of the Sun and solar activity phenomena provided by the twin STEREO missions about 120 degrees behind and ahead of Earth and other spacecraft around the Earth and ground-based observatories. These new observational insights are continuously posing new questions, inspiring and advancing theoretical analysis and

  4. EMACK electromagnetic launcher commissioning

    NASA Astrophysics Data System (ADS)

    Deis, D. W.; Scherbarth, D. W.; Ferrentino, G. L.

    1984-03-01

    The Laboratory Demonstration Electromagnetic Launcher Program (EMACK) was initiated in April 1979, with the objective to design, construct, and demonstrate a complete electromagnetic launcher (EML) system capable of accelerating projectiles of substantial mass to velocities significantly greater than those achievable with conventional chemical systems. The last hardware was installed in late 1981. During February 1982, a series of five test shots was made to evaluate the system's performance. Particular attention is given to the parameters of the final, as-built hardware, and the results of the commissioning tests. The results of these tests have demonstrated the viability of the components required for large scale electromagnetic launchers. It has been shown that large projectiles with velocities significantly greater than those achievable by chemical systems can be accelerated intact.

  5. Commission 45: Spectral Classification

    NASA Astrophysics Data System (ADS)

    Giridhar, Sunetra; Gray, Richard O.; Corbally, Christopher J.; Bailer-Jones, Coryn A. L.; Eyer, Laurent; Irwin, Michael J.; Kirkpatrick, J. Davy; Majewski, Steven; Minniti, Dante; Nordström, Birgitta

    This report gives an update of developments (since the last General Assembly at Prague) in the areas that are of relevance to the commission. In addition to numerous papers, a new monograph entitled Stellar Spectral Classification with Richard Gray and Chris Corbally as leading authors will be published by Princeton University Press as part of their Princeton Series in Astrophysics in April 2009. This book is an up-to-date and encyclopedic review of stellar spectral classification across the H-R diagram, including the traditional MK system in the blue-violet, recent extensions into the ultraviolet and infrared, the newly defined L-type and T-type spectral classes, as well as spectral classification of carbon stars, S-type stars, white dwarfs, novae, supernovae and Wolf-Rayet stars.

  6. Joint Commission on rock properties

    NASA Astrophysics Data System (ADS)

    A joint commission on Rock Properties for Petroleum Engineers (RPPE) has been established by the International Society of Rock Mechanics and the Society of Petroleum Engineers to set up data banks on the properties of sedimentary rocks encountered during drilling. Computer-based data banks of complete rock properties will be organized for sandstones (GRESA), shales (ARSHA) and carbonates (CARCA). The commission hopes to access data sources from members of the commission, private companies and the public domain.

  7. ALICE TPC commissioning results

    NASA Astrophysics Data System (ADS)

    Larsen, D. T.; Alice Tpc Collaboration

    2010-05-01

    ALICE is a dedicated heavy-ion experiment at CERN LHC aiming to study the properties of the quark-gluon plasma. A lead-lead collision might produce several 10 00 new particles. Detailed study of the event requires precise measurements of the particle tracks. A 90 m3 Time Projection Chamber (TPC) with more than 500 000 read-out pads was built as the main central barrel tracker. Collisions can be recorded at a rate of up to about 1 kHz. The front-end electronics, designed from FPGAs and custom ASICs, performs shaping, amplification, digitisation and digital filtering of the signals. The data are forwarded to DAQ via 216 1.25 Gb/s fibre-optical links. Configuration, control and monitoring is done by an embedded Linux system on the front-end electronics. Before production runs with beam, extensive commissioning using tracks from cosmics and from the laser system as well as clusters from radioactive krypton gas is needed. Extensive results have been obtained with respect to the performance of the TPC including its sub-systems.

  8. National Knowledge Commission

    NASA Astrophysics Data System (ADS)

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  9. Ozone transport commission developments

    SciTech Connect

    Joyce, K.M.

    1995-08-01

    On September 27, 1994, the states of the Ozone Transport Commission (OTC) signed an important memorandum of understanding (MOU) agreeing to develop a regional strategy for controlling stationary sources of nitrogen oxide emissions. Specifically, the states of the Ozone Transport Region, OTR, agreed to propose regulations for the control of NOx emissions from boilers and other indirect heat exchangers with a maximum gross heat input rate of at least 250 million BTU per hour. The Ozone Transport Region was divided into Inner, Outer and Northern Zones. States in the Outer Zone agreed to reduce NOx emissions by 55%. States in the Inner Zone agreed to reduce NOx emissions 65%. Facilities in both zones have the option to emit NOx at a rate no greater than 0.2 pounds per million Btu by May 1, 1999. This option provides fairness for the gas-fired plants which already have relatively low NOx emissions. Additionally, States in the Inner and Outer Zones agreed to reduce their NOx emissions by 75% or to emit NOx at a rate no greater than 0.15 pounds per million BTU by May 1, 2003. The Northern Zone States agree to reduce their rate of NOx emissions by 55% from base year levels by May 1, 2003, or to emit NOx at a rate no greater than 0.2 pounds per million BTU. As part of this MOU, States also agreed to develop a regionwide trading mechanism to provide a cost-effective mechanism for implementing the reductions.

  10. Commissioning of NSLS-II

    SciTech Connect

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  11. Model Commissioning Plan and Guide Specifications

    SciTech Connect

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  12. 76 FR 24081 - Notice of Commission Determination

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Notice of Commission Determination AGENCY: Susquehanna River Basin Commission. ACTION: Notice of commission determination. SUMMARY: Pursuant to authority set forth in the Susquehanna River Basin...

  13. Post Commission Final Draft: Recommendations of Interest to Commission.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    A brief overview is presented by a blue ribbon commission on the organization of elementary/secondary education and higher education in California, funding provided to community colleges, and recommendations of the California Postsecondary Education Commission regarding postsecondary education. In addition, an outline of issues facing…

  14. Vermont Technical Education Commission Report.

    ERIC Educational Resources Information Center

    Vermont State Technical Education Commission, Montpelier.

    A 1968 New England Regional Commission grant to the Vermont Department of Administration financed a feasibility study for a technical college at the postsecondary level. The commission undertook two specific studies: an examination of ultimate career destinations of Vermont secondary students and a survey of Vermont industry to determine immediate…

  15. Reflections on the Gordon Commission

    ERIC Educational Resources Information Center

    Haertel, Edward

    2014-01-01

    Background:This brief reflection on the work of the Gordon Commission calls out significant themes and implications found in the various papers authored by the commissioners and other scholars, especially those included in this special issue of Teachers College Record. Purpose: The forward-looking vision of the Gordon Commission is contrasted with…

  16. Illinois State Scholarship Commission Report.

    ERIC Educational Resources Information Center

    Illinois State Scholarship Commission, Deerfield.

    The Illinois State Scholarship Commission (ISSC) is responsible for the administration of 9 state authorized and funded financial aid programs for Illinois postsecondary students. The major programs consist of: (1) nonrepayable monetary awards, and (2) guaranteed educational loans. The purposes of the Commission's programs are to: (1) equalize…

  17. Commission 31: Time

    NASA Astrophysics Data System (ADS)

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  18. How commissioning affects community nursing.

    PubMed

    Cook, Jane; Horrocks, Susan; Gibbard, Emma; Harland, Lizanne; Wye, Lesley

    Community nurses have direct experience of how changes in the local health economy affect the quality of care patients receive, so it is important that they engage with commissioning to influence decisions made about the quality and direction of their service. This article seeks to demystify commissioning priorities by drawing on findings from a survey of Commissioning for Quality and Innovation indicators for community nursing conducted in England, 2014-15. The article focuses specifically on organisational goals, highlighting the impact of the Francis report and other NHS priorities on quality assessment in community nursing. PMID:26721091

  19. 77 FR 52106 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ...The Susquehanna River Basin Commission will hold its regular business meeting on September 20, 2012, in Harrisburg, Pennsylvania. Details concerning the matters to be addressed at the business meeting are contained in the Supplementary Information section of this...

  20. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  1. 75 FR 48661 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ...The U.S. Secretary of Education (Secretary) announces the establishment of the Equity and Excellence Commission (Equity Commission or Commission). The Federal Advisory Committee Act (FACA) (Pub. L. 92-463, as amended; 5 U.S.C.A., Appendix 2) shall govern the Equity Commission. Purpose: The Secretary is establishing the Commission in order to collect information, analyze issues, and obtain......

  2. 11 CFR 9002.3 - Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Commission. 9002.3 Section 9002.3 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: GENERAL ELECTION FINANCING DEFINITIONS § 9002.3 Commission. Commission means the Federal Election Commission, 999 E Street,...

  3. 11 CFR 9032.3 - Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Commission. 9032.3 Section 9032.3 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: PRESIDENTIAL PRIMARY MATCHING FUND DEFINITIONS § 9032.3 Commission. Commission means the Federal Election Commission, 999 E Street...

  4. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  5. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by...

  6. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  7. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  8. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by...

  9. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  10. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by...

  11. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by...

  12. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  13. GREGOR telescope: start of commissioning

    NASA Astrophysics Data System (ADS)

    Volkmer, R.; von der Lühe, O.; Denker, C.; Solanki, S.; Balthasar, H.; Berkefeld, T.; Caligari, P.; Collados, M.; Halbgewachs, C.; Heidecke, F.; Hofmann, A.; Klvana, M.; Kneer, F.; Lagg, A.; Popow, E.; Schmidt, D.; Schmidt, W.; Sobotka, M.; Soltau, D.; Strassmeier, K.

    2010-07-01

    With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.

  14. Commission 41: History of Astronomy

    NASA Astrophysics Data System (ADS)

    Gurshtein, Alexander A.; Nha, Il-Seong; Ruggles, Clive L. N.; DeVorkin, David H.; Dick, Wolfgang R.; Kochhar, Rajesh; Nakamura, Tsuko; Pigatto, Luisa; Stephenson, F. Richard; Warner, Brian

    2007-12-01

    On Tuesday 22 August 2006 approximately 40 people attended the Commission 41 History of Astronomy Business Meeting at the IAU XXVI General Assembly in Prague. Commission president Alex Gurshtein opened the meeting, welcoming the commission members and calling for a moment of silence for those members who passed away in the last triennium. David DeVorkin was appointed recording secretary for the meeting, with Steven Dick as the scruitineer of the ballot. A moment of silence was then observed in the memory of members departed over the last triennium, including: Jerzy Dobrzycki (Poland), Robert Duncan (Australia), Mohammad Edalati (Iran), Philip Morrison (USA), John Perdix (Australia), Neil Porter (Ireland), Gibson Reaves (USA), Brian Robinson (Australia), and Raymond E. White (USA).

  15. Division a Commission 8: Astrometry

    NASA Astrophysics Data System (ADS)

    Zacharias, Norbert; Brown, Anthony; Evans, Dafydd; Chen, Li; Gouda, Naoteru; Makarov, Valeri; Shulga, Aleksandr; Souchay, Jean; Teixeira, Rama; Unwin, Stephen

    2016-04-01

    Commission 8 has regularly published triennial reports in the past and the current OC therefore voted to adopt a traditional format also for this special Legacy issue of the IAU Transactions. The outgoing President is grateful for the support of many Commission members who contributed to this report. Our contribution consists of 3 parts: 1) this introduction, providing a general overview and highlights of recent research in astrometry, 2) a summary of the astrometry business & science meeting at the 2015 IAU General Assembly, and 3) the activity report of our Commisson covering the mid-2012 to mid-2015 period.

  16. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 1 2012-01-01 2012-01-01 false The Commission. 0.1 Section 0.1 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in...

  17. 10 CFR 110.91 - Commission consultations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission consultations. 110.91 Section 110.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Public Participation Procedures Concerning License Applications § 110.91 Commission consultations. The Commission...

  18. Securities and Exchange Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... [The Regulatory Plan and Unified Agenda of Federal Regulatory and Deregulatory Actions] Part XXIV Securities and Exchange Commission Semiannual Regulatory Agenda ] SECURITIES AND EXCHANGE COMMISSION (SEC) SECURITIES AND EXCHANGE COMMISSION 17 CFR Ch. II Regulatory Flexibility Agenda AGENCY: Securities and Exchange Commission. ACTION:...

  19. 47 CFR 1.1528 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Commission review. 1.1528 Section 1.1528... Applications § 1.1528 Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on...

  20. 47 CFR 1.5004 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission action. 1.5004 Section 1.5004 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Exempt Telecommunications Companies § 1.5004 Commission action. If the Commission has not issued an order granting or denying...

  1. 10 CFR 2.806 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Commission action. 2.806 Section 2.806 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Rulemaking § 2.806 Commission action. The Commission will incorporate in the notice of adoption of a regulation...

  2. 76 FR 63325 - National Indian Gaming Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... Register on November 18, 2010. 75 FR 70680. The Commission's regulatory review process established a tribal... National Indian Gaming Commission AGENCY: National Indian Gaming Commission. ACTION: Notice of no action. SUMMARY: On November 18, 2010, the National Indian Gaming Commission (NIGC) issued a Notice of Inquiry...

  3. 16 CFR 4.15 - Commission meetings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Commission meetings. 4.15 Section 4.15... RULES § 4.15 Commission meetings. (a) In general. (1) Meetings of the Commission, as defined in 5 U.S.C... announcements of meetings. For each meeting, the Commission shall announce: (i) The time, place and...

  4. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false The Commission. 0.1 Section 0.1 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in...

  5. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 1 2011-04-01 2011-04-01 false The Commission. 140.10 Section..., AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same...

  6. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 1 2012-04-01 2012-04-01 false The Commission. 140.10 Section..., AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same...

  7. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 1 2013-04-01 2013-04-01 false The Commission. 140.10 Section..., AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same...

  8. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 2 2014-04-01 2014-04-01 false The Commission. 140.10 Section...) ORGANIZATION, FUNCTIONS, AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the...

  9. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false The Commission. 140.10 Section..., AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same...

  10. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false The Commission. 0.1 Section 0.1 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in...

  11. 47 CFR 1.1528 - Commission review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Commission review. 1.1528 Section 1.1528... Applications § 1.1528 Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on...

  12. 47 CFR 1.1528 - Commission review.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Commission review. 1.1528 Section 1.1528... Applications § 1.1528 Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on...

  13. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2,...

  14. Surrogacy commissioning fathers and HIV.

    PubMed

    Jordaan, Donrich W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have been tested for HIV; that he has consented to his HIV status being made available to the surrogate mother, and if he is HIV-positive, that sperm washing will be used to minimise the risk of infection and that the surrogate mother has been informed of his HIV status, and given her informed consent.  PMID:24388075

  15. Commissioning: perspectives from the ground.

    PubMed

    Dawda, Paresh; True, Angelene; Wells, Leanne

    2016-01-01

    Primary Health Networks (PHNs) have been tasked with two key objectives to be achieved through commissioning. Public value aims can be achieved by developing operational capability in the context of an authorising environment. Public value will need to focus on system level outcomes from multiple perspectives, including a consumer perspective. The authorising environment will require policymakers to allow time for PHNs to mature into their role. It will require an environment of effective collaboration amongst multiple stakeholders including consumers. The operational capability will need to ensure highly competent managers and clinical leadership working in a symbiotic relationship. Although some Medicare Locals demonstrated commissioning capacity and capability, this will need to be scaled up at-pace in the new healthcare landscape in order for PHNs to optimally fulfil their roles. PMID:27469048

  16. Commissioning of the LCLS LINAC

    SciTech Connect

    Loos, H.; Akre, R.; Brachmann, A.; Decker, F.-J.; Ding, Y.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Huang, Z.; Iverson, R.; Limborg-Deprey, C.; Miahnahri, A.; Molloy, S.; Nuhn, H.-D.; Turner, J.; Welch, J.; White, W.; Wu, J.; /SLAC /Stanford U., Appl. Phys. Dept.

    2010-06-11

    The Linac Coherent Light Source (LCLS) X-ray free electron laser project is currently under construction at the Stanford Linear Accelerator Center (SLAC). A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac to the undulator is scheduled to start in November 2008 and for the undulator in March 2009 with first light to be expected in July 2009.

  17. Population commission discusses international migration.

    PubMed

    1997-01-01

    At the 30th session of the Commission on Population and Development during February 24-28, 1997, international migration was the main topic, with special linkages between migration and development and on gender issues and the family. New and emerging issues were also considered. Members stressed the need for more reliable data on migration, the direction of migrants flows, and the characteristics of migrants. The Commission requested a task force on basic social services to hold a technical symposium of experts on international migration in 1998. Its chair, Dr. Nafis Sadik, said that migration issues should based on the reality of choice not on coercive measures or quotas. Almost half of the migrants globally are women. The Commission was given a new impetus by the International Conference on Population and Development held at Cairo in 1994. Migration pressures intensified in the second half of the 1980s and in the early 1990s, creating areas of concern: the negative impact of short-term migration on working conditions in host countries; migration pressures emanating from climatic change; the protection of migrant women and their children; the right of receiving countries to regulate access to their territory; the adverse consequences of forced migration; the situation of persons whose asylum claims have been rejected; the trafficking in women and children, prostitution and coercive adoption; and the sudden and massive arrival of refugees in need of international protection. The 1998 session of the Commission will feature the theme of health and mortality, with special emphasis on the linkages between health and development and on gender and age. PMID:12292475

  18. 77 FR 74181 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc.: NEPOOL...

  19. 78 FR 36183 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the South Carolina Regional...

  20. 77 FR 11531 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission...

  1. 78 FR 4406 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the South Carolina Regional...

  2. 78 FR 36770 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  3. 77 FR 59184 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives ] notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.:...

  4. 78 FR 32386 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  5. 77 FR 63308 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  6. 78 FR 24193 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  7. 78 FR 28839 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  8. 77 FR 73645 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  9. 77 FR 14777 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.:...

  10. 78 FR 21927 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the ] transmission planning activities of the Southern Company Services,...

  11. 78 FR 39728 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  12. 78 FR 18330 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  13. 78 FR 38313 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  14. 77 FR 21978 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the...

  15. 75 FR 41451 - Commission Agenda and Priorities; Notice of Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... From the Federal Register Online via the Government Publishing Office CONSUMER PRODUCT SAFETY COMMISSION Commission Agenda and Priorities; Notice of Hearing AGENCY: Consumer Product Safety Commission. ACTION: Notice of public hearing. SUMMARY: The Consumer Product Safety Commission (``Commission'')...

  16. 75 FR 52799 - Notice of Public Hearing and Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Notice of Public Hearing and Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice of public hearing and Commission meeting. SUMMARY: The Susquehanna River Basin Commission...

  17. 75 FR 72857 - Notice of Public Hearing and Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Notice of Public Hearing and Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice of public hearing and Commission meeting. SUMMARY: The Susquehanna River Basin Commission...

  18. Commissioning New Construction at Emory University.

    ERIC Educational Resources Information Center

    Smith, Robin

    2001-01-01

    Discusses the process of "commissioning" for effectively maintaining and verifying new construction needs for campus facilities on a continuous improvement basis. The Emory University facility management program illustrates how to develop and manage a building commissioning process. (GR)

  19. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema

    Paul Saueressig

    2010-09-01

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  20. Division J Commission 28: Galaxies

    NASA Astrophysics Data System (ADS)

    Gallagher, John S.; Davies, Roger L.; Courteau, Stéphane; Dekel, Avishai; Franx, Marijn; Jog, Chanda J.; Jogee, Sardha; Nakai, Naomasa; Rubio, Monica; Tacconi, Linda; Terlevich, Elena

    2016-04-01

    IAU Commission 28 (IAU C28: Galaxies) was founded in the late 1930s at which time it had only a small membership (see the historical notes by Sadler et al. 2007). When C28 ended its existence in 2015 there were well over 1000 members on its books. The membership had grown to the point where the effort to keep track of active participants had become a major task. During the C28s tenure 27 IAU Symposia have been devoted to galaxies, the third highest number (Mickaelian 2014)

  1. Commissioning Instrument for the GTC

    NASA Astrophysics Data System (ADS)

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  2. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  3. Bioethics commission to review gene patenting

    SciTech Connect

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  4. 77 FR 31605 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ...This notice sets forth the schedule and proposed agenda of an up- coming meeting of the Equity and Excellence Commission (Commission). The notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a)(2) of the Federal Advisory Committee Act (FACA) and is intended to notify the public of their opportunity to...

  5. 76 FR 41233 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... Equity and Excellence Commission AGENCY: U.S. Department of Education, Office for Civil Rights. ACTION... meeting of the Equity and Excellence Commission (Commission). The notice also describes the functions of... Center Plaza, 550 12th Street, SW., Washington, DC 20202 in the auditorium (room 10026). FOR...

  6. 46 CFR 502.161 - Commission's files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Commission's files. 502.161 Section 502.161 Shipping...; Presiding Officers; Evidence § 502.161 Commission's files. Where any matter contained in a tariff, report, or other document on file with the Commission is offered in evidence, such document need not...

  7. 78 FR 44927 - 101st Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ... From the Federal Register Online via the Government Publishing Office ARCTIC RESEARCH COMMISSION 101st Commission Meeting Notice is hereby given that the U.S. Arctic Research Commission will hold its... presentations concerning Arctic research activities The focus of the meeting will be Arctic research...

  8. 39 CFR 3060.42 - Commission review.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Commission review. 3060.42 Section 3060.42 Postal... COMPETITIVE PRODUCTS ENTERPRISE § 3060.42 Commission review. (a) Interested persons shall be provided an... documentation. (b) The Commission will review the calculation of the assumed Federal income tax...

  9. 10 CFR 110.40 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Commission review. 110.40 Section 110.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Review of License Applications § 110.40 Commission review. (a) Immediately after receipt of a license application for an...

  10. 76 FR 55424 - CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ...The U.S. Office of Personnel Management announces the establishment of the CFC-50 Advisory Commission. The Commission shall advise the Director of the U.S. Office of Personnel Management (OPM) on strengthening the integrity, the operation and effectiveness of the Combined Federal Campaign (CFC) to ensure its continued growth and success. The Commission is an advisory committee composed of......

  11. 76 FR 27034 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION... upcoming meeting of the Equity and Excellence Commission (Commission). The notice also describes...

  12. 76 FR 62394 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION...-coming meeting of the Equity and Excellence Commission (Commission). The notice also describes...

  13. 47 CFR 1.425 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission action. 1.425 Section 1.425... Proceedings § 1.425 Commission action. The Commission will consider all relevant comments and material of record before taking final action in a rulemaking proceeding and will issue a decision incorporating...

  14. 10 CFR 2.1331 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Commission action. 2.1331 Section 2.1331 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1331 Commission action. (a) Upon completion of...

  15. 10 CFR 110.113 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission action. 110.113 Section 110.113 Energy NUCLEAR... Commission action. (a) Upon completion of a hearing, the Commission will issue a written opinion including... hearing issues; and (4) Take other action, as appropriate....

  16. 75 FR 18469 - April 2010 Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ...; ] EXECUTIVE OFFICE OF THE PRESIDENT National Commission on Fiscal Responsibility and Reform April 2010...), the National Commission on Fiscal Responsibility and Reform announces the following meeting: Name: National Commission on Fiscal Responsibility and Reform April 2010 Meeting. Time and Date: Tuesday,...

  17. 77 FR 39560 - International Joint Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... International Joint Commission International Joint Commission Invites Public Comment on Upper Great Lakes Report The International Joint Commission (IJC) announced today that it is inviting public comment on the final report of its International Upper Great Lakes Study Board, Lake Superior Regulation:...

  18. The Truman Commission's Vision of the Future

    ERIC Educational Resources Information Center

    Hutcheson, Philo A.

    2007-01-01

    Looking back over three centuries of American higher education, one can see both strengths and weaknesses in the changing attitudes toward teaching goals. In this article, the author discusses the Truman Commission's (President Harry Truman appointed the higher education commission in July 1946, and charged the commission members to examine…

  19. 39 CFR 3060.42 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Commission review. 3060.42 Section 3060.42 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ACCOUNTING PRACTICES AND TAX RULES FOR THE THEORETICAL COMPETITIVE PRODUCTS ENTERPRISE § 3060.42 Commission review. (a) Interested persons shall be provided...

  20. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... President pursuant to the provisions of section 3 of Reorganization Plan No. 10 of 1950 (3 CFR, 1949-1953... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be...

  1. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or...

  2. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  3. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  4. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... President pursuant to the provisions of section 3 of Reorganization Plan No. 10 of 1950 (3 CFR, 1949-1953... 17 Commodity and Securities Exchanges 3 2014-04-01 2014-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be...

  5. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... President pursuant to the provisions of section 3 of Reorganization Plan No. 10 of 1950 (3 CFR, 1949-1953... 17 Commodity and Securities Exchanges 2 2012-04-01 2012-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be...

  6. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or...

  7. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or...

  8. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... President pursuant to the provisions of section 3 of Reorganization Plan No. 10 of 1950 (3 CFR, 1949-1953... 17 Commodity and Securities Exchanges 2 2013-04-01 2013-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be...

  9. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... President pursuant to the provisions of section 3 of Reorganization Plan No. 10 of 1950 (3 CFR, 1949-1953... 17 Commodity and Securities Exchanges 2 2011-04-01 2011-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be...

  10. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  11. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86...

  12. 17 CFR 200.63 - Commission opinions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 3 2014-04-01 2014-04-01 false Commission opinions. 200.63 Section 200.63 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Canons of Ethics § 200.63 Commission opinions. The...

  13. 29 CFR 2204.309 - Commission review.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the judge's decision on the fee application, and the Commission may grant such petitions for review or... 29 Labor 9 2013-07-01 2013-07-01 false Commission review. 2204.309 Section 2204.309 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION...

  14. 29 CFR 2204.309 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the judge's decision on the fee application, and the Commission may grant such petitions for review or... 29 Labor 9 2012-07-01 2012-07-01 false Commission review. 2204.309 Section 2204.309 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION...

  15. 29 CFR 2704.308 - Commission review.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Commission review. 2704.308 Section 2704.308 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION OF... § 2704.308 Commission review. (a) Either the applicant or the Secretary of Labor may seek review by...

  16. 29 CFR 2704.308 - Commission review.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Commission review. 2704.308 Section 2704.308 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION OF... § 2704.308 Commission review. (a) Either the applicant or the Secretary of Labor may seek review by...

  17. 29 CFR 2704.308 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Commission review. 2704.308 Section 2704.308 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION OF... § 2704.308 Commission review. (a) Either the applicant or the Secretary of Labor may seek review by...

  18. 29 CFR 2204.309 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the judge's decision on the fee application, and the Commission may grant such petitions for review or... 29 Labor 9 2010-07-01 2010-07-01 false Commission review. 2204.309 Section 2204.309 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION...

  19. 29 CFR 2204.309 - Commission review.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the judge's decision on the fee application, and the Commission may grant such petitions for review or... 29 Labor 9 2014-07-01 2014-07-01 false Commission review. 2204.309 Section 2204.309 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION...

  20. 29 CFR 2204.309 - Commission review.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the judge's decision on the fee application, and the Commission may grant such petitions for review or... 29 Labor 9 2011-07-01 2011-07-01 false Commission review. 2204.309 Section 2204.309 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION...

  1. 29 CFR 2704.308 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Commission review. 2704.308 Section 2704.308 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION OF... § 2704.308 Commission review. (a) Either the applicant or the Secretary of Labor may seek review by...

  2. 29 CFR 2704.308 - Commission review.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Commission review. 2704.308 Section 2704.308 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION OF... § 2704.308 Commission review. (a) Either the applicant or the Secretary of Labor may seek review by...

  3. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  4. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  5. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  6. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  7. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  8. Iowa College Student Aid Commission Case Study

    ERIC Educational Resources Information Center

    Leigh, Rachel A.

    2007-01-01

    The purpose of this descriptive case study was to trace the policy production process of a state agency, the Iowa College Student Aid Commission (Commission), to its function today. This case study relied on a review of federal and state statutes, a news article search, biennium reports of the Commission, and information obtained from the…

  9. The Commission on Magnet® Recognition.

    PubMed

    Moran, Janice W

    2016-09-01

    The American Nurses Credentialing Center (ANCC) Commission on Magnet® Recognition is a voluntary governing body that oversees the Magnet Recognition Program®. Commission members are appointed by the ANCC Board of Directors and are expert representatives from various sectors of the nursing community. In addition, 1 commission member represents public consumers. PMID:27556648

  10. 17 CFR 200.63 - Commission opinions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 2 2012-04-01 2012-04-01 false Commission opinions. 200.63 Section 200.63 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Canons of Ethics § 200.63 Commission opinions. The...

  11. 17 CFR 200.63 - Commission opinions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission opinions. 200.63 Section 200.63 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Canons of Ethics § 200.63 Commission opinions. The...

  12. 17 CFR 200.63 - Commission opinions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 2 2013-04-01 2013-04-01 false Commission opinions. 200.63 Section 200.63 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Canons of Ethics § 200.63 Commission opinions. The...

  13. 17 CFR 200.63 - Commission opinions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 2 2011-04-01 2011-04-01 false Commission opinions. 200.63 Section 200.63 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Canons of Ethics § 200.63 Commission opinions. The...

  14. Beyond Commissioning: The Role of Automation

    SciTech Connect

    Brambley, Michael R.; Katipamula, Srinivas

    2005-02-01

    This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  15. 77 FR 41877 - International Joint Commission; International Joint Commission To Hold Public Hearings on Lake...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... International Joint Commission; International Joint Commission To Hold Public Hearings on Lake Osoyoos The International Joint Commission (IJC) is inviting the public to comment on recommendations for the renewal of its... of the International Joint Commission's Osoyoos Lake Order now posted on the IJC Web site at...

  16. Commissioning neuropsychiatry services: barriers and lessons.

    PubMed

    Bhattacharya, Rahul; Rickards, Hugh; Agrawal, Niruj

    2015-12-01

    Aims and method Previous studies have shown variations in commissioning of neuropsychiatry services and this makes access to neuropsychiatric services a post-code lottery. In this survey, we approached all mental health and neuropsychiatric service commissioners within London to map current funding and commissioning arrangements, and explored perceived barriers to neuropsychiatric service commissioning. Results 83% of commissioners within London responded. There was significant variability between neuropsychiatric services commissioned through the mental health stream. Contracting arrangements were variable. Lack of earmarked fund for neuropsychiatry and disjointed funding stream for such services were identified by commissioners as a barrier, as was the critical mass of neuropsychiatric cases. Clinical implications Neuropsychiatric service development continues to be hindered by lack of clear commissioning process. Strategic drive is needed to promote more equitable neuropsychiatric services. National or regional commissioning covering a large population will provide a better model for neuropsychiatric services to be commissioned. PMID:26755989

  17. Commissioning neuropsychiatry services: barriers and lessons

    PubMed Central

    Bhattacharya, Rahul; Rickards, Hugh; Agrawal, Niruj

    2015-01-01

    Aims and method Previous studies have shown variations in commissioning of neuropsychiatry services and this makes access to neuropsychiatric services a post-code lottery. In this survey, we approached all mental health and neuropsychiatric service commissioners within London to map current funding and commissioning arrangements, and explored perceived barriers to neuropsychiatric service commissioning. Results 83% of commissioners within London responded. There was significant variability between neuropsychiatric services commissioned through the mental health stream. Contracting arrangements were variable. Lack of earmarked fund for neuropsychiatry and disjointed funding stream for such services were identified by commissioners as a barrier, as was the critical mass of neuropsychiatric cases. Clinical implications Neuropsychiatric service development continues to be hindered by lack of clear commissioning process. Strategic drive is needed to promote more equitable neuropsychiatric services. National or regional commissioning covering a large population will provide a better model for neuropsychiatric services to be commissioned. PMID:26755989

  18. Commission 19: Rotation of the Earth

    NASA Astrophysics Data System (ADS)

    Brzezinski, Aleksander; Ma, Chopo; Dehant, Véronique; Defraigne, Pascale; Dickey, Jean O.; Huang, Cheng-Li; Souchay, Jean; Vondrák, Jan; Charlot, Patrick; Richter, Bernd; Schuh, Harald

    The Commission supports and coordinates scientific investigations in the Earth rotation and related reference frames. Several changes had been introduced to the structure of Commission 19 since the IAU XXVI General Assembly in Prague, 2006. The Organizing Committee of Commission 19 has been substantially reduced. It consists now of six ex-officio members, the Commission president, vice-president, past president and representatives from the International Association of Geodesy (IAG), International Earth Rotation and Reference Systems Service (IERS), International VLBI Service for Geodesy and Astrometry (IVS), and five members at-large who are nominated by the OC, selected by the Commission members and elected by the IAU GA for a maximum of two terms. The modified terms of reference of Commission 19, the list of members and other details can be found at the Commission website .

  19. Automated Demand Response and Commissioning

    SciTech Connect

    Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

    2005-04-01

    This paper describes the results from the second season of research to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve the electric grid reliability and manage electricity costs. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. We refer to this as Auto-DR. The evaluation of the control and communications must be properly configured and pass through a set of test stages: Readiness, Approval, Price Client/Price Server Communication, Internet Gateway/Internet Relay Communication, Control of Equipment, and DR Shed Effectiveness. New commissioning tests are needed for such systems to improve connecting demand responsive building systems to the electric grid demand response systems.

  20. The commissioning of FTS-2

    NASA Astrophysics Data System (ADS)

    AbdElazim, Sherif

    Despite that over half the energy emitted by the universe falls in the sub-millimetre wavelength region, and the fact that sub-millimetre astronomy enables the study of star formation, it remains an unexplored field. This is due to the low transmittance of the atmosphere and the complexity of the instrumentation. However, recent advances in technology have resulted in instruments that can explore this waveband. One such instrument, FTS-2, is a Fourier transform spectrometer that has been developed for use with a new bolometric camera SCUBA-2. FTS-2 will provide wide field imaging spectroscopy at sub-millimetre wavelengths. This thesis presents the current performance of FTS-2 based on the results obtained from commissioning. As with the application with any new technology, unforeseen issues emerged. The thesis identifies several issues and introduces potential solutions. Although limited astronomical data were obtained, spectra of Venus have been analysed, and provide an indication of the potential of FTS-2.

  1. RHIC Spin Flipper Commissioning Status

    SciTech Connect

    Bai, M.; Meot, F.; Dawson, C.; Oddo, P.; Pai, C.; Pile, P.; Makdisi, Y.; Meng, W.; Roser, T.

    2010-05-23

    The commissioning of the RHIC spin flipper in the RHIC Blue ring during the RHIC polarized proton run in 2009 showed the detrimental effects of global vertical coherent betatron oscillation induced by the 2-AC dipole plus 4-DC dipole configuration. This global orbital coherent oscillation of the RHIC beam in the Blue ring in the presence of collision modulated the beam-beam interaction between the two RHIC beams and affected Yellow beam polarization. The experimental data at injection with different spin tunes by changing the snake current also demonstrated that it was not possible to induce a single isolated spin resonance with the global vertical coherent betatron oscillation excited by the two AC dipoles. Hence, a new design was proposed to eliminate the coherent vertical betatron oscillation outside the spin flipper by adding three additional AC dipoles. This paper presents the experimental results as well as the new design.

  2. Division A Commission 31: Time

    NASA Astrophysics Data System (ADS)

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  3. Orion: a commissioned user facility

    NASA Astrophysics Data System (ADS)

    Treadwell, P. A.; Allan, P.; Cann, N.; Danson, C.; Duffield, S.; Elsmere, S.; Edwards, R.; Egan, D.; Girling, M.; Gumbrell, E.; Harvey, E.; Hill, M.; Hillier, D.; Hoarty, D.; Hobbs, L.; Hopps, N.; Hussey, D.; Oades, K.; James, S.; Norman, M.; Palmer, J.; Parker, S.; Winter, D.; Bett, T.

    2013-05-01

    The Orion Laser Facility at AWE in the UK consists of ten nanosecond beamlines and two sub-picosecond beamlines. The nanosecond beamlines each nominally deliver 500 J at 351 nm in a 1 ns square temporal profile, but can also deliver a user-definable temporal profile with durations between 0.1 ns and 5 ns. The sub-picosecond beamlines each nominally deliver 500 J at 1053 nm in a 500 fs pulse, with a peak irradiance of greater than 1021 W/cm2. One of the sub-picosecond beamlines can also be frequency-converted to deliver 100 J at 527 nm in a 500 fs pulse, although this is at half the aperture of the 1053 nm beam. Commissioning of all twelve beamlines has been completed, including the 527 nm sub-picosecond option. An overview of the design of the Orion beamlines will be presented, along with a summary of the commissioning and subsequent performance data. The design of Orion was underwritten by running various computer simulations of the beamlines. Work is now underway to validate these simulations against real system data, with the aim of creating predictive models of beamline performance. These predictive models will enable the user's experimental requirements to be critically assessed ahead of time, and will ultimately be used to determine key system settings and parameters. The facility is now conducting high energy density physics experiments. A capability experiment has already been conducted that demonstrates that Orion can generate plasmas at several million Kelvin and several times solid density. From March 2013 15% of the facility operating time will be given over to external academic users in addition to collaborative experiments with AWE scientists.

  4. SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE

    SciTech Connect

    Shishlo, Andrei P; Galambos, John D

    2008-01-01

    The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

  5. 77 FR 50492 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  6. 77 FR 73645 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  7. 77 FR 38045 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  8. 77 FR 28869 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.: 2012...

  9. 77 FR 31004 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  10. 77 FR 47620 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, LLC (PJM): PJM...

  11. 77 FR 3764 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission System...

  12. 77 FR 42300 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  13. 77 FR 64983 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  14. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  15. 76 FR 76157 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  16. 77 FR 58376 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  17. 77 FR 38046 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.: 2012...

  18. 77 FR 34034 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  19. 76 FR 60820 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission System...

  20. 77 FR 37665 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the North Carolina Transmission Planning...

  1. 77 FR 40606 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  2. 77 FR 6556 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  3. 77 FR 21765 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  4. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is...

  5. 77 FR 24485 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following...

  6. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the ASC methodology set forth at 18 CFR 301.1. If the ASC is not in accord with the methodology, the... Commission under this subpart is computed in accordance with 18 CFR 35.19a. Interest on any increase ordered... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Commission review....

  7. 17 CFR 201.57 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the procedures set forth in 17 CFR 201.410 and 201.411, either the applicant or counsel for the Office or... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review....

  8. Appalachian Regional Commission Annual Report, 2001.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    In fiscal year 2001, the Appalachian Regional Commission invested $63.6 million in 469 economic and human development (nonhighway) projects and $389.6 million in highway projects in Appalachia. The Commission launched a new initiative to promote the development of telecommunications infrastructure, especially in distressed counties. The Commission…

  9. The Civil Rights Commission Must Persist

    ERIC Educational Resources Information Center

    Reynolds, Gerald A.

    2007-01-01

    Columnist George Will and others have questioned the continuing need for a federal civil rights commission, because civil rights protections have been on the books since 1964. The chairman of the Commission, Gerald Reynolds, here responds that practitioners of critical legal theory, advocates of the Akaka-Secession bill, some proponents of…

  10. Federal Trade Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... No. 12866 ``Regulatory Planning and Review'' of September 30, 1993, 58 FR 51735 (Oct. 4, 1993). Since... Final Rule, which the Commission issued jointly with the Federal Reserve on January 15, 2010 (75 FR 2724... Regulatory Plan narrative. 74 FR 64137, 64366. The Commission has also responded to the optional...

  11. 77 FR 67637 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Equity and Excellence Commission AGENCY: U.S. Department of Education, Office for Civil Rights. ACTION... Federal Official, Equity and Excellence Commission, U.S. Department of Education, 400 Maryland Avenue...

  12. 77 FR 484 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION..., Equity and Excellence Commission, U.S. Department of Education, 400 Maryland Avenue SW, Washington,...

  13. Commission on Preservation and Access Newsletter, 1995.

    ERIC Educational Resources Information Center

    Commission on Preservation and Access Newsletter, 1995

    1995-01-01

    The Commission on Preservation and Access was established to foster and support collaboration among libraries and allied organizations in order to ensure the preservation of the published and documentary records in all formats and to provide enhanced access to scholarly information. The Commission's newsletter keeps preservation and access…

  14. Setting up Blue Ribbon Commissions. Issuegram 15.

    ERIC Educational Resources Information Center

    Palaich, Robert; And Others

    Options and suggestions for setting up successful study commissions were gathered from 10 commissions that had recommended revisions of state educational policy on a variety of issues. Composed of respected citizens from across the state, each task force was created by the governor or legislature for a fixed duration. Some recommendations for…

  15. CCRIS: Carnegie Commission Reports Information System.

    ERIC Educational Resources Information Center

    Lavin, Mary Jo

    The Carnegie Commission Reports Information System (CCRIS) attempts to make the findings of the 22 Commission reports (published by McGraw Hill Book Company) more readily available to the academic community. CCRIS consists of an explanatory text of 16 pages introducing the reader to a set of 1500 edge-notched McBee cards. Each card contains a…

  16. 76 FR 53159 - CFC-50 Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... MANAGEMENT CFC-50 Commission Meeting AGENCY: Office of Personnel Management. ACTION: Establishment of..., 2011, at the time and location shown below. The Commission shall advise the Director of the U.S. Office of Personnel Management (OPM) on strengthening the integrity, the operation and effectiveness of...

  17. 76 FR 72452 - CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... MANAGEMENT CFC-50 Commission AGENCY: Office of Personnel Management. ACTION: Establishment of advisory... time and location shown below. The Commission shall advise the Director of the U.S. Office of Personnel Management (OPM) on strengthening the integrity, the operation and effectiveness of the Combined...

  18. Wyoming Community College Commission Annual Report, 2010

    ERIC Educational Resources Information Center

    Wyoming Community College Commission, 2010

    2010-01-01

    The Wyoming Community College Commission (WCCC) serves the system of Wyoming's seven community colleges. Wyoming's seven community colleges provide affordable, accessible and lifelong education. The Wyoming Community College Commission supports the colleges through advocacy, coordination and collaboration. In partnership with the colleges, the…

  19. Commission 25: Stellar Photometry and Polarimetry

    NASA Astrophysics Data System (ADS)

    Martinez, Peter; Milone, Eugene; Landolt, Arlo; Jordi, Carme; Mironov, Aleksey; Shenbang, Qian; Schmidt, Edward; Sterken, Christiaan

    2010-05-01

    The Business Meeting for Commission 25 was held on the 6th of August 2009. The meeting was chaired by Dr Eugene Milone, Vice President for the 2006-2009 triennium, and incoming President for the 2009-2011 triennium. Dr Milone presented an apology from the President of the Commission, Dr Peter Martinez, who was unable to attend the meeting.

  20. Commissioning MMS: Challenges and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  1. Commission 12: Solar Radiation and Structure

    NASA Astrophysics Data System (ADS)

    Cauzzi, Gianna; Shchukina, Nataliya; Kosovichev, Alexander; Bianda, Michele; Brandenburg, Axel; Chou, Dean-Yi; Dasso, Sergio; Ding, Ming-De; Jefferies, Stuart; Krivova, Natalie; Kuznetsov, Vladimir D.; Moreno-Insertis, Fernando

    2016-04-01

    Commission 12 of the International Astronomical Union encompasses investigations of the internal structure and dynamics of the Sun, the quiet solar atmosphere, solar radiation and its variability, and the nature of relatively stable magnetic structures like sunspots, faculae and the magnetic network. The Commission sees participation of over 300 scientists worldwide.

  2. A Practical Guide for Commissioning Existing Buildings

    SciTech Connect

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  3. A Practical Guide for Commissioning Existing Buildings

    SciTech Connect

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  4. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  5. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Mississippi River Commission: Public observation of Commission meetings. 209.50 Section 209.50 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River Commission: Public observation...

  6. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  7. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  8. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  9. Dasty3, a WEB framework for DAS

    PubMed Central

    Villaveces, Jose M.; Jimenez, Rafael C.; Garcia, Leyla J.; Salazar, Gustavo A.; Gel, Bernat; Mulder, Nicola; Martin, Maria; Garcia, Alexander; Hermjakob, Henning

    2011-01-01

    Motivation: Dasty3 is a highly interactive and extensible Web-based framework. It provides a rich Application Programming Interface upon which it is possible to develop specialized clients capable of retrieving information from DAS sources as well as from data providers not using the DAS protocol. Dasty3 provides significant improvements on previous Web-based frameworks and is implemented using the 1.6 DAS specification. Availability: Dasty3 is an open-source tool freely available at http://www.ebi.ac.uk/dasty/ under the terms of the GNU General public license. Source and documentation can be found at http://code.google.com/p/dasty/. Contact: hhe@ebi.ac.uk PMID:21798964

  10. Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect

    Brambley, Michael R.; Katipamula, Srinivas

    2011-08-16

    This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  11. Instrumented home energy rating and commissioning

    SciTech Connect

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  12. The Pepper Commission Report and the response.

    PubMed

    1990-01-01

    The recommendations of the "Pepper Commission" [the Bipartisan Commission on Comprehensive Health Care] on health care policy reform (see box on page 20) would cost an estimated $66 billion to implement. As a result, many in Congress already have declared the Pepper report to be politically nonviable. Nevertheless, Commission Chairman John D. Rockefeller IV intends to pursue legislative activity on the report. Recently, Rockefeller said that the Commission's majority recommendations likely will be offered in Congress as one large bill--with the option to break out some of its features for individual consideration. For example, Rockefeller said he will try this year to enact the Commission's recommendations to improve health care coverage for pregnant women and children--as well as suggestions for reform in the health insurance industry. The West Virginia senator said he believes these two proposals will cost about $3.5 billion in new federal funds. The basics of the plan, and the political obstacles facing its enactment, were discussed by several members of the Pepper Commission during the press conference at which the recommendations were unveiled. FAHS Review covered that press conference, and below we reprint excerpts from a tape transcription of the remarks of several Commission members. PMID:10113210

  13. Division G Commission 42: Close Binary Stars

    NASA Astrophysics Data System (ADS)

    Richards, Mercedes T.; Pribulla, Theodor; Ribas, Ignasi; Bradstreet, David H.; Dreschsel, Horst; Maceroni, Carla; Mikolajewska, Joanna; Munari, Ulisse; Prsa, Andrej; Scharfe, Colin; Southworth, John; Trimble, Virginia

    2016-04-01

    Commission 42 began life as Photometric Double Stars in 1948 at the 7th General Assembly in Zurich, under the presidency of Zdenek Kopal. As early as 1961, then General Secretary Lukas Plaut recommended a merger between C42 and C26, Double Stars, one of the original 32 commissions going back to 1919-22 (first president Aitken, assistant director at Lick). C42 became Close Binary Stars in 1970, at the 14th GA in Brighton (the first one I attended). Table 1 shows the presidents of C42, and vice presidents, from when the office started, through the history of the Commission.

  14. 76 FR 6774 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... finance systems to achieve equity in the distribution of educational resources and further ] student performance, especially for the students at the lower end of the achievement gap. The Commission will...

  15. 76 FR 55059 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... finance systems to achieve equity in the distribution of educational resources and further student performance, especially for the students at the lower end of the achievement gap. The Commission will...

  16. 77 FR 49441 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    ... finance systems to achieve equity in the distribution of educational resources and further student performance, especially for the students at the lower end of the achievement gap. The Commission will...

  17. 10 CFR 110.40 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Canada. (5) An export involving assistance to end uses related to isotope separation, chemical... up to 5 percent in the isotope uranium-235, and those categories of exports which the Commission...

  18. Commissioning medical education: principles for best practice.

    PubMed

    Walsh, Kieran

    2016-04-01

    We need to ensure that we get value for money for our investments in medical education. Commissioning is one method of ensuring that we get value. However, like any other tool, it needs to be used properly. PMID:27071431

  19. Presidential commission investigating Challenger accident at JSC

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Views of the Presidential commission investigating the Challenger accident at Johnson Space Center (JSC). Two JSC Officials chat prior to a meeting with members of the Presidential Commission on the Space Shuttle Challenger accident, while one of the commissioners studies his notes. Left to right in the foreground are Richard H. Kohrs, Deputy Manager of the National Space Transportation System (NSTS) program office; JSC Deputy Director Robert C. Goetz and Joseph F. Sutter (28749); Two JSC Officials and two members of the Commission meet in the Executive Conference Room of JSC's Project Management Building. Left to right are Goetz; Kohrs; Sutter and Dr. Arthur B.C. Walker Jr. (28750); More meeting between NASA and the commission. Left to right are Goetz; Kohrs; Walker and Robert W. Rummel and Joseph F. Sutter (28751).

  20. 75 FR 48662 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... Secretary for Civil Rights. Nomination Process: Any interested person or organization may nominate one or...: Send to: WhiteHouseLiaison@ed.gov (specify in the e-mail subject line, ``Equity Commission...

  1. 16 CFR 1101.51 - Commission interpretation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INFORMATION DISCLOSURE UNDER SECTION 6(b) OF THE CONSUMER PRODUCT SAFETY ACT Retraction § 1101.51 Commission... retraction of such inaccurate or misleading information. (b) Scope. Section 6(b)(7) applies to inaccurate...

  2. GHRSST-14 DAS-TAG Report

    NASA Technical Reports Server (NTRS)

    Armstrong, Edward; Piolle, Jean Francois

    2013-01-01

    The DAS-TAG provides the informatics and data management expertise in emerging information technologies for the GHRSST community. It provides expertise in data and metadata formats and standards, fosters improvements for GHRSST data curation, experiments with new data processing paradigms, and evaluates services and tools for data usage. It provides a forum for producer and distributor data management issues and coordination.

  3. Physik gestern und heute Das Eiskalorimeter

    NASA Astrophysics Data System (ADS)

    Heering, P.

    2003-07-01

    Kalorimetrische Messungen gehören heute zum experimentellen Standardrepertoire im Bereich der Thermodynamik und der physikalischen Chemie. Das erste Gerät für derartige Messungen entwickelten Ende des 18. Jahrhunderts die französischen Wissenschaftler Antoine Laurent Lavoisier und Pierre Simon de Laplace.

  4. Division II: Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    van Driel-Gesztelyi, Lidia; Scrijver, Karel J.; Klimchuk, James A.; Charbonneau, Paul; Fletcher, Lyndsay; Hasan, S. Sirajul; Hudson, Hugh S.; Kusano, Kanya; Mandrini, Cristina H.; Peter, Hardi; Vršnak, Bojan; Yan, Yihua

    2015-08-01

    The Business Meeting of Commission 10 was held as part of the Business Meeting of Division II (Sun and Heliosphere), chaired by Valentin Martínez-Pillet, the President of the Division. The President of Commission 10 (C10; Solar activity), Lidia van Driel-Gesztelyi, took the chair for the business meeting of C10. She summarised the activities of C10 over the triennium and the election of the incoming OC.

  5. Division B Commission 40: Radio Astronomy

    NASA Astrophysics Data System (ADS)

    Chapman, Jessica M.; Giovaninni, Gabriele; Taylor, Russell; Carilli, Christopher; Hills, Richard; Hirabayashi, Hisashi; Jonas, Justin L.; Lazio, Joseph; Morganti, Rafaella; Nan, Rendong; Rubio, Monica; Shastri, Prjaval; Kellermann, Ken; Ekers, Ronald; Ohishi, Masatoshi

    2016-04-01

    IAU Commission 40 for Radio Astronomy (hereafter C40) brought together scientists and engineers who carry out observational and theoretical research in radio astronomy and who develop and operate the ground and space-based radio astronomy facilities and instrumentation. As of June 2015, the Commission had approximately 1,100 members from 49 countries, corresponding to nearly 10 per cent of the total IAU membership.

  6. 47 CFR 0.416 - The Federal Communications Commission Record.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false The Federal Communications Commission Record. 0.416 Section 0.416 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General Information Printed Publications § 0.416 The Federal Communications Commission Record. Texts adopted by the Commission or a member of...

  7. 78 FR 26361 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc., New York...

  8. 77 FR 30003 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  9. 77 FR 3765 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator,...

  10. 78 FR 14783 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc., New York...

  11. 77 FR 42717 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C....

  12. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  13. 78 FR 37214 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc. and...

  14. 46 CFR 502.24 - Practice before the Commission defined.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 9 2014-10-01 2014-10-01 false Practice before the Commission defined. 502.24 Section 502.24 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS RULES OF PRACTICE AND PROCEDURE Appearance and Practice Before the Commission § 502.24 Practice before the Commission defined. (a) Practice before the Commission...

  15. 47 CFR 0.416 - The Federal Communications Commission Record.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false The Federal Communications Commission Record. 0.416 Section 0.416 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General Information Printed Publications § 0.416 The Federal Communications Commission Record. Texts adopted by the Commission or a member of...

  16. Building commissioning: The key to quality assurance

    SciTech Connect

    1998-05-01

    This Guide is written to aid building owners and retrofit project managers currently participating in the Rebuild America program. The Guide provides information on implementing building commissioning projects that will optimize the results of existing building equipment improvements and retrofits projects. It should be used in coordination with Rebuild America`s Community Partnership Handbook. The Handbook describes, in detail, eight important steps necessary for planning and carrying out a community-wide energy-efficiency program. In step number 7 of the Handbook, commissioning is shown to be an integral aspect of implementing a building retrofit. The commissioning process ensures that a facility is safe, efficient, comfortable, and conducive to the presumed activities for which it was constructed. Rebuild America strongly encourages its partners to incorporate commissioning into their retrofit projects. By verifying the correct installation, functioning, operation, and maintenance of equipment, the commissioning process ensures that efficiency measures will continue to deliver benefits over the long term. Although commissioning can take place after the equipment has been installed, it is more effective when it takes place over the entire equipment installation process.

  17. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    SciTech Connect

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  18. 76 FR 7839 - Notice of Commission and Commission Staff Attendance at ISO/RTO Council and Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Energy Regulatory Commission Notice of Commission and Commission Staff Attendance at ISO/RTO Council and... of the Commission and Commission staff may attend the following ISO/RTO Council and Regional State..., RTO/ISO Performance Metrics. For more information, contact Sandra Waldstein, Office of...

  19. 77 FR 47050 - Commission Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities; Comment Request AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Comment request. SUMMARY: In compliance with...

  20. 77 FR 52020 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... information, contact Jesse Hensley, Office of Energy Market Regulation, Federal Energy Regulatory Commission... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy...

  1. Das morgendliche Brückenritual

    NASA Astrophysics Data System (ADS)

    Sander, Oliver

    Es wäre für Mediziner sehr interessant zu wissen, was für Kräfte genau in den menschlichen Knien wirken. Klar ist, dass sie recht groß sein müssen. Das Gewicht eines erwachsenen Mannes beträgt ca. 80 kg. Wenn davon je die Hälfte auf einem Bein ruht hat man schon mindestens 400 Newton pro Knie, beim Laufen, Springen, oder Treppensteigen noch viel mehr. Man will es aber noch viel genauer wissen. Die Kondylen, das sind die Kontaktflächen in den Knien, sind nicht eben. Es gibt dort Unregelmäßigkeiten, und die Kräfte konzentrieren sich dort. An einzelnen Stellen können die Kräfte dann noch viel höher sein.

  2. Moisture Forecast Bias Correction in GEOS DAS

    NASA Technical Reports Server (NTRS)

    Dee, D.

    1999-01-01

    Data assimilation methods rely on numerous assumptions about the errors involved in measuring and forecasting atmospheric fields. One of the more disturbing of these is that short-term model forecasts are assumed to be unbiased. In case of atmospheric moisture, for example, observational evidence shows that the systematic component of errors in forecasts and analyses is often of the same order of magnitude as the random component. we have implemented a sequential algorithm for estimating forecast moisture bias from rawinsonde data in the Goddard Earth Observing System Data Assimilation System (GEOS DAS). The algorithm is designed to remove the systematic component of analysis errors and can be easily incorporated in an existing statistical data assimilation system. We will present results of initial experiments that show a significant reduction of bias in the GEOS DAS moisture analyses.

  3. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  4. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  5. VINCI: the VLT Interferometer commissioning instrument

    NASA Astrophysics Data System (ADS)

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  6. Commissioning an Elekta Versa HD linear accelerator.

    PubMed

    Narayanasamy, Ganesh; Saenz, Daniel; Cruz, Wilbert; Ha, Chul S; Papanikolaou, Niko; Stathakis, Sotirios

    2016-01-01

    The purpose of this study is to report the dosimetric aspects of commissioning performed on an Elekta Versa HD linear accelerator (linac) with high-dose-rate flattening filter-free (FFF) photon modes and electron modes. Acceptance and commissioning was performed on the Elekta Versa HD linac with five photon energies (6 MV, 10 MV, 18 MV, 6 MV FFF, 10 MV FFF), four electron energies (6 MeV, 9MeV, 12 MeV, 15 MeV) and 160-leaf (5 mm wide) multileaf collimators (MLCs). Mechanical and dosimetric data were measured and evaluated. The measurements include percent depth doses (PDDs), in-plane and cross-plane profiles, head scatter factor (Sc), relative photon output factors (Scp), universal wedge transmission factor, MLC transmission factors, and electron cone factors. Gantry, collimator, and couch isocentricity measurements were within 1 mm, 0.7 mm, and 0.7 mm diameter, respectively. The PDDs of 6 MV FFF and 10 MV FFF beams show deeper dmax and steeper falloff with depth than the corresponding flattened beams. While flatness values of 6 MV FFF and 10 MV FFF normalized profiles were expectedly higher than the corresponding flattened beams, the symmetry values were almost identical. The cross-plane penumbra values were higher than the in-plane penumbra values for all the energies. The MLC transmission values were 0.5%, 0.6%, and 0.6% for 6 MV, 10 MV, and 18 MV photon beams, respectively. The electron PDDs, profiles, and cone factors agree well with the literature. The outcome of radiation treatment is directly related to the accuracy in the dose modeled in the treatment planning system, which is based on the commissioned data. Commissioning data provided us a valuable insight into the dosimetric characteristics of the beam. This set of commissioning data can provide comparison data to others performing Versa HD commissioning, thereby improving patient safety. PMID:26894351

  7. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    SciTech Connect

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  8. 75 FR 27981 - Codex Alimentarius Commission: Meeting of the Codex Alimentarius Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... Food Safety and Inspection Service Codex Alimentarius Commission: Meeting of the Codex Alimentarius Commission AGENCY: Office of Food Safety, USDA. ACTION: Notice of public meeting and request for comments. SUMMARY: The Office of Food Safety, U.S. Department of Agriculture (USDA), is sponsoring a public...

  9. 78 FR 57818 - Commission Participation and Commission Employee Involvement in Voluntary Standards Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... Commission Employee Involvement in Voluntary Standards Activities. 54 FR 6646 (Feb. 14, 1989). In 2006, the Commission amended several provisions of part 1031. 71 FR 38754 (July 10, 2006). Among other things, the 2006... the development of voluntary standards (43 FR 19216 (May 4, 1978)). Acknowledging the...

  10. Boys' Reading Commission 2012: A Review of Existing Research Conducted to Underpin the Commission

    ERIC Educational Resources Information Center

    Clark, Christina

    2012-01-01

    The gender gap has been a hotly debated issue, both nationally and internationally. In 2000, the then Department for Education and Schools commissioned a four-year study into raising boys' achievement. The commission worked with over 60 primary, secondary and special schools in England to identify and evaluate the strategies highlighted to be…

  11. National Commission on Excellence in Teacher Education: Commissioned Papers from the Regional Hearings. ERIC Digest.

    ERIC Educational Resources Information Center

    Butler, Catherine

    The National Commission on Excellence in Teacher Education was appointed in 1983 to describe the present state of teacher education, identify problem issues, and make recommendations for the improvement of teacher education. The final report of the Commission, "A Call for Change in Teacher Education," was based on information gathered at the…

  12. Division XII: Commission 6: Astronomical Telegrams

    NASA Astrophysics Data System (ADS)

    Samus, N. N.; Yamaoka, H.; Gilmore, A. C.; Aksnes, K.; Green, D. W. E.; Marsden, B. G.; Nakano, S.; Lara, Martin; Pitjeva, Elena V.; Sphar, T.; Ticha, J.; Williams, G.

    2015-08-01

    IAU Commission 6 ``Astronomical Telegrams'' had a single business meeting during the Beijing General Assembly of the IAU. It took place on Friday, August 24, 2012. The meeting was attended by five C6 members (N. N. Samus; D. W. E. Green; S. Nakano; J. Ticha; and H. Yamaoka). Also present was Prof. F. Genova as a representative of the IAU Division B. She told the audience about the current restructuring of IAU Commissions and Divisions and consequences for the future of C6.

  13. Commission 5: Documentation and Astronomical Data

    NASA Astrophysics Data System (ADS)

    Ohishi, Masatoshi; Hanisch, Robert J.; Norris, Ray P.; Andernach, Heinz; Bishop, Marsha; Griffin, Elizabeth; Kembhavi, Ajit; Murphy, Tara; Pasian, Fabio

    2012-04-01

    IAU Commission 5 (http://www.nao.ac.jp/IAU/Com5/) deals with data management issues, and its working groups and task group deal specifically with information handling, with data centers and networks, with technical aspects of collection, archiving, storage and dissemination of data, with designations and classification of astronomical objects, with library services, editorial policies, computer communications, ad hoc methodologies, and with various standards, reference frames, etc. FITS (Flexible Image Transport System), the major data exchange format in astronomy, has been standardized, maintained and updated by the FITS working group under Commission 5.

  14. Appalachian Regional Commission: 1984 Annual Report.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Federal appropriations totalling over $162 million during fiscal year 1984 enabled the Appalachian Regional Commission (ARC) to attack the region's most critical needs. Area development appropriations ($43 million) were used to create almost 10,550 new jobs and retain nearly 4,100 jobs, give special assistance to Appalachia's neediest 80 counties…

  15. Appalachian Regional Commission: 1982 Annual Report.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Fiscal year 1982 was transitional for the Appalachian Regional Commission (ARC), as it was the last year of the broad economic development program and a year of reduced funding and new limits on programs. In 1981, Congress had requested that ARC prepare a plan for completion of the Appalachian highway system and for a 3 to 5 year ARC finish-up…

  16. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM § 9.4... United States armed forces (“Military Officer”), including without limitation reserve personnel on active duty, National Guard personnel on active duty in Federal service, and retired personnel recalled...

  17. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM § 9.4... United States armed forces (“Military Officer”), including without limitation reserve personnel on active duty, National Guard personnel on active duty in Federal service, and retired personnel recalled...

  18. Bicentennial Commission Busy with Exciting Projects.

    ERIC Educational Resources Information Center

    Stone, Kirk

    1989-01-01

    Based on an interview with U.S. Chief Justice Warren E. Burger, this article surveys several of the projects launched by the Commission on the Bicentennial of the Constitution. These projects include: the National Historical Pictorial Map Contest; the Bicentennial School Recognition Program; the Bicentennial Educational Grant Program; and the…

  19. Appalachian Regional Commission: 1986 Annual Report.

    ERIC Educational Resources Information Center

    Russell, Jack, Ed.; And Others

    The Appalachian Regional Commission used its $120 million appropriation for fiscal year 1986 to create and retain jobs under the jobs and private investment program, provide basic public facilities to the worst-off Appalachian counties under the distressed counties program, and to work toward closing the gaps in the Appalachian Development Highway…

  20. 17 CFR 30.13 - Commission certification.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... and options contracts on a non-narrow-based security index: (a) Request for certification. A foreign board of trade may request that the Commission certify that a futures contract on a non-narrow-based... index between regularly scheduled reviews; (D) Method of calculation of the cash-settlement price...

  1. 17 CFR 30.13 - Commission certification.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and options contracts on a non-narrow-based security index: (a) Request for certification. A foreign board of trade may request that the Commission certify that a futures contract on a non-narrow-based... index between regularly scheduled reviews; (D) Method of calculation of the cash-settlement price...

  2. 17 CFR 30.13 - Commission certification.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and options contracts on a non-narrow-based security index: (a) Request for certification. A foreign board of trade may request that the Commission certify that a futures contract on a non-narrow-based... index between regularly scheduled reviews; (D) Method of calculation of the cash-settlement price...

  3. Report of Programme Commission II (Natural Sciences).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France). General Conference.

    As the first part of the report of the Programme Commission II, a summary of discussions on plans for natural sciences and their applications is presented in this document. The two agenda items are: (1) detailed consideration of the 1973-74 draft program and budget and of the 1973-78 draft medium-term outline, and (2) desirability of adopting an…

  4. 19 CFR 127.34 - Auctioneer's commissions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Auctioneer's commissions. 127.34 Section 127.34 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY GENERAL ORDER, UNCLAIMED, AND ABANDONED MERCHANDISE Proceeds of Sale § 127.34...

  5. 77 FR 18798 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Equity and Excellence Commission AGENCY: U.S. Department of Education. ACTION: Notice; Advisory Committee Meeting Cancellation. SUMMARY: The Department of Education gives notice of the cancellation of the...

  6. Commission 19: ROTATION OF THE EARTH

    NASA Astrophysics Data System (ADS)

    Brzeziński, Aleksander; Ma, Chopo; Dehant, Véronique; Defraigne, Pascale; Dickey, Jean O.; Huang, Cheng-Li; Souchay, Jean; Vondrák, Jan; Charlot, Patrick; Richter, Bernd; Schuh, Harald

    2010-05-01

    The IAU Commission 19 meeting during the XXVII IAU General Assembly in Rio de Janeiro was held on Wednesday 5 August 2009, sessions 3 (14:00-15:30) and 4 (16:00-17:30). It was attended by about 40 participants. The meeting was split into three sessions.

  7. 32 CFR 17.3 - Commission personnel.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with 32 CFR part 9, the Appointing Authority shall appoint at least three but no more than seven... questioning in any manner he deems appropriate. Consistent with 32 CFR part 9, any such questioning shall be... 32 National Defense 1 2010-07-01 2010-07-01 false Commission personnel. 17.3 Section 17.3...

  8. Wyoming Community College Commission Annual Report, 2009

    ERIC Educational Resources Information Center

    Wyoming Community College Commission, 2009

    2009-01-01

    The Wyoming Community College Commission (WCCC) collaborates with Wyoming's seven community colleges to provide educational experiences that strengthen, support and enrich communities and prepare students to successfully meet life's challenges and recognize and profit from opportunities. Wyoming's seven community colleges provide affordable,…

  9. Wyoming Community College Commission Annual Report, 2008

    ERIC Educational Resources Information Center

    Wyoming Community College Commission, 2008

    2008-01-01

    The Wyoming Community College Commission (WCCC) collaborates with Wyoming's seven community colleges to provide educational experiences that strengthen, support and enrich communities and prepare students to successfully meet life's challenges and recognize and profit from opportunities. Wyoming's seven community colleges provide affordable,…

  10. 1977 Annual Report - Appalachian Regional Commission.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Narrative and tabular data, maps, and photographs comprise this annual report for fiscal 1977 on the Appalachian Regional Commission. Among highlights reported for the year were: completion of half the mileage in the Appalachian Development Highway system, further reducing inhabitants' isolation from jobs, schools, and markets; continued reversal…

  11. Report of the Commission on Quantum Quality.

    ERIC Educational Resources Information Center

    Thor, Linda; And Others

    The Commission on Quantum Quality was established by the Maricopa County Community College District (MCCCD) in February, 1992, to investigate total quality management (TQM) programs in community colleges, universities, the government sector, and business and industry in order to recommend an appropriate program for MCCCD. To gather information,…

  12. Appalachian Regional Commission: 1987 Annual Report.

    ERIC Educational Resources Information Center

    Russell, Jack, Ed.; And Others

    The Appalachian Regional Commission (ARC) used its $105 million appropriation for fiscal year 1987 to support three major program areas in the 13 state region: (1) creating and retaining regional jobs; (2) assisting in construction of basic facilities, particularly water and sewer systems, in the region's 90 poorest counties; and (3) working…

  13. Solar Dynamics Observatory Launch and Commissioning

    NASA Technical Reports Server (NTRS)

    O'Donnell, James R., Jr.; Kristin, D.; Bourkland, L.; Hsu, Oscar C.; Liu, Kuo-Chia; Mason, Paul A. C.; Morgenstern, Wendy M.; Russo, Angela M.; Starin, Scott R.; Vess, Melissa F.

    2011-01-01

    The Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.

  14. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... determine whether the ASC set by BPA for the applicable exchange period was determined in accordance with the ASC methodology set forth at 18 CFR 301.1. If the ASC is not in accord with the methodology, the... Commission under this subpart is computed in accordance with 18 CFR 35.19a. Interest on any increase...

  15. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... determine whether the ASC set by BPA for the applicable exchange period was determined in accordance with the ASC methodology set forth at 18 CFR 301.1. If the ASC is not in accord with the methodology, the... Commission under this subpart is computed in accordance with 18 CFR 35.19a. Interest on any increase...

  16. 76 FR 4369 - Special Law Enforcement Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following... Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver are effective on... Interim Domestic Violence Waiver. The documents are being published for interim use on the Indian...

  17. Wyoming Community College Commission Agency Annual Report.

    ERIC Educational Resources Information Center

    Wyoming Community Coll. Commission, Cheyenne.

    This paper reports on outcomes of community college programs monitored by the Wyoming Community College Commission (WCCC). The document covers the following WCCC objectives: (1) Study of tuition rates for the community colleges; (2) Negotiation of contracts and provision of financial support for administrative computing system components and…

  18. Appalachian Regional Commission Annual Report, 2000.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    In 2000, the Appalachian Regional Commission (ARC), in cooperation with local development districts, nonprofit organizations, and many small municipalities, expanded programs to help Appalachia's distressed counties become economically competitive. The effort calls for increased funding for technical assistance and capacity building in distressed…

  19. The National Commission on Nursing Implementation Project.

    ERIC Educational Resources Information Center

    De Back, Vivien

    1991-01-01

    Outcomes of the National Commission on Nursing Implementation Project were (1) a study of cost-effective nursing delivery systems; (2) development of nursing information systems; (3) "Nursing's Vital Signs," which documented information collected; (4) the National Nursing Image Campaign; and (5) initiatives to redesign nursing education, practice,…

  20. Chapter 1 Commission Issues Interim Report.

    ERIC Educational Resources Information Center

    Commission on Chapter 1, Baltimore, MD.

    This report presents an interim analysis by an independent commission of current moves to reform Chapter 1 of the Hawkins/Stafford Elementary and Secondary School Improvement Amendments of 1988. Chapter 1 is the largest federal assistance program to elementary school and secondary school education. The report responds to questions on strengthening…

  1. The Truman Commission: International Developments for Colleges

    ERIC Educational Resources Information Center

    Burke, Kenneth M.

    2008-01-01

    Research briefly details the purpose of the Harry S. Truman administration's Commission on Higher Education for Democracy to support community colleges. Contrary to histories that define later origins in the 1960s, this paper makes an argument that the historical foundations of ideation for international education in community colleges originate…

  2. COMMISSION 5: Documentation and Astronomical Data

    NASA Astrophysics Data System (ADS)

    Genova, Françoise; Norris, Raymond P.; Bessel, M. S.; Dluzhnevskaia, O.; Jenkner, H.; Malkov, O.; Murtagh, F.; Nakajima, K.; Ochsenbein, F.; Pence, W.; Schmitz, M.; Wielen, R.; Zhao, Y. H.

    2007-03-01

    The triennial report of Commission V Documentation and Astronomical Data/Documentation et Données Astronomiques covers 2002-2005 activities, and in particular the activities of the five Working Groups: Working Group Astronomical Data; Working Group Designations; Working Group Libraries; Working Group FITS; Working Group Virtual Observatories; and of Task Force for the Preservation and Digitization of Photographic Plates.

  3. Commissioning the polarized beam in the AGS

    SciTech Connect

    Ratner, L.G.; Brown, H.; Chiang, I.H.; Courant, E.; Gardner, C.; Lazarus, D.; Lee, Y.Y.; Makdisi, Y.; Sidhu, S.; Skelly, J.

    1985-01-01

    After the successful operation of a high energy polarized proton beam at the Argonne Laboratory Zero Gradient Synchrotron (ZGS) was terminated, plans were made to commission such a beam at the Brookhaven National Laboratory Alternating Gradient Synchrotron (AGS). On February 23, 1984, 2 ..mu..A of polarized H/sup -/ was accelerated through the Linac to 200 MeV with a polarization of about 65%. 1 ..mu..A was injected into the AGS and acceleration attempts began. Several relatively short runs were then made during the next three months. Dedicated commissioning began in early June, and on June 26 the AGS polarized beam reached 13.8 GeV/c to exceed the previous ZGS peak momentum of 12.75 GeV/c. Commissioning continued to the point where 10/sup 10/ polarized protons were accelerated to 16.5 GeV/c with 40% polarization. Then, two experiments had a short polarized proton run. We plan to continue commissioning efforts in the fall of this year to reach higher energy, higher intensity, and higher polarization levels. We present a brief description of the facility and of the methods used for preserving the polarization of the accelerating beam.

  4. Commissioning of CMS Endcap Muon System

    NASA Astrophysics Data System (ADS)

    Brownell, Elizabeth

    2009-05-01

    This talk is as an overview of the evolution and current state of commissioning work on the CMS endcap muon system. I intend to highlight the progress in operating the detector, some problems encountered and solutions developed, lessons learned in the process, points which still require action to be taken, and data taking results.

  5. SLS linac diagnostics—commissioning results

    NASA Astrophysics Data System (ADS)

    Dach, M.; Dehler, M.; Jaggi, A.; Kramert, R.; Pedrozzi, P.; Schlott, V.; Streun, A.

    2000-11-01

    The paper presents the electron beam diagnostics along the 100 MeV pre-injector Linac for the Swiss Light Source (SLS). The concept of the different diagnostic monitors for current and current related measurements, optical measurements and beam position measurements are briefly described. Commissioning results of the pre-injector Linac are presented.

  6. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the ASC methodology set forth at 18 CFR 301.1. If the ASC is not in accord with the methodology, the... Commission under this subpart is computed in accordance with 18 CFR 35.19a. Interest on any increase ordered... and Requirements for Public Utility Sales of Power to Bonneville Power Administration Under...

  7. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the ASC methodology set forth at 18 CFR 301.1. If the ASC is not in accord with the methodology, the... Commission under this subpart is computed in accordance with 18 CFR 35.19a. Interest on any increase ordered... and Requirements for Public Utility Sales of Power to Bonneville Power Administration Under...

  8. 77 FR 48429 - Commission Address Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... From the Federal Register Online via the Government Publishing Office FEDERAL MINE SAFETY AND...: Federal Mine Safety and Health Review Commission (FMSHRC). ACTION: Final rule. SUMMARY: The Federal Mine... INFORMATION CONTACT: Sarah Stewart, Deputy General Counsel, Office of the General Counsel, Federal Mine...

  9. 77 FR 10004 - CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... MANAGEMENT CFC-50 Commission AGENCY: Office of Personnel Management. ACTION: Establishment of advisory... Personnel Management (OPM) on strengthening the integrity, the operation and effectiveness of the Combined... public. Please contact the Office of Personnel Management at the address shown below if you wish...

  10. Appalachian Regional Commission: 1980 Annual Report.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1980, past achievements, and future goals. Major accomplishments of 1980 include: allocation of almost $13 million for 1,023 nonhighway projects; completion or construction of almost 60% of the Appalachian…

  11. 10 CFR 62.25 - Criteria for a Commission determination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Criteria for a Commission determination. 62.25 Section 62.25 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CRITERIA AND PROCEDURES FOR EMERGENCY ACCESS TO NON-FEDERAL AND REGIONAL LOW-LEVEL WASTE DISPOSAL FACILITIES Issuance of a Commission Determination § 62.25 Criteria for a Commission determination....

  12. 22 CFR 401.8 - Decision by the whole Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Decision by the whole Commission. 401.8 Section 401.8 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE General § 401.8 Decision by the whole Commission. The whole Commission shall consider and determine...

  13. 29 CFR 2200.93 - Briefs before the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Briefs before the Commission. 2200.93 Section 2200.93 Labor... Posthearing Procedures § 2200.93 Briefs before the Commission. (a) Requests for briefs. The Commission ordinarily will request the parties to file briefs on issues before the Commission. After briefs...

  14. 29 CFR 2200.93 - Briefs before the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Briefs before the Commission. 2200.93 Section 2200.93 Labor... Posthearing Procedures § 2200.93 Briefs before the Commission. (a) Requests for briefs. The Commission ordinarily will request the parties to file briefs on issues before the Commission. After briefs...

  15. 16 CFR 1013.4 - Public attendance at Commission meetings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Public attendance at Commission meetings. 1013.4 Section 1013.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL GOVERNMENT IN THE SUNSHINE ACT, RULES FOR COMMISSION MEETINGS § 1013.4 Public attendance at Commission meetings. (a) Attendance by the public. Every portion of...

  16. 16 CFR 1013.4 - Public attendance at Commission meetings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Public attendance at Commission meetings. 1013.4 Section 1013.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL GOVERNMENT IN THE SUNSHINE ACT, RULES FOR COMMISSION MEETINGS § 1013.4 Public attendance at Commission meetings. (a) Attendance by the public. Every portion of...

  17. 77 FR 30003 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): Combined...

  18. 77 FR 70160 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  19. 77 FR 36532 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  20. 76 FR 66060 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  1. 77 FR 60980 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Mid-Continent Area Power Pool (MAPP) and...

  2. 77 FR 75630 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc., New York Independent...

  3. 77 FR 65680 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  4. 77 FR 35959 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following teleconference related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Seams FERC...

  5. 77 FR 19011 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  6. 77 FR 75630 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  7. 77 FR 64982 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): Midwest...

  8. 77 FR 64332 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc., New York Independent...

  9. 77 FR 37664 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  10. 76 FR 66061 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings: of...): MISO Planning Advisory Committee, October 25, 2011, 9 a.m.-4 p.m., Local Time. MISO RECB Task...

  11. 77 FR 42718 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): ] Order...

  12. 77 FR 50098 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  13. 78 FR 9688 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  14. 77 FR 63307 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Seams FERC...

  15. 77 FR 24486 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  16. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  17. 77 FR 12277 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  18. 77 FR 34378 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  19. 77 FR 52714 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  20. 76 FR 64343 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc.: Order 1000: NEPOOL...

  1. 76 FR 64083 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): SPP...

  2. 77 FR 50097 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  3. 77 FR 71584 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  4. 77 FR 42490 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  5. 77 FR 50097 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  6. 77 FR 41181 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of New York Independent System Operator, Inc.: Joint...

  7. 19 CFR 210.49 - Implementation of Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Implementation of Commission action. 210.49 Section 210.49 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR... Implementation of Commission action. (a) Service of Commission determination upon the parties. A...

  8. 77 FR 4720 - Appeal Proceedings Before the Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ...The National Indian Gaming Commission proposes to add a new subchapter to its regulations to create a clear process for appeal proceedings before the Commission. It would, among other things, define certain terms, set forth the burden of proof and standard of review, explain what information a Commission decision will contain, and what happens if the Commission does not issue a majority......

  9. Commission on Child Online Protection (COPA) Report to Congress. Appendices.

    ERIC Educational Resources Information Center

    2000

    The appendices for the Commission on Child Online Protection (COPA) Report to Congress, October 20, 2000, include the following: Commission overview, which includes scope and timeline, original statute, amended statute, technologies and methods, and biographies of the commissioners; Commission finances; Commission meetings for the year 2000;…

  10. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources,...

  11. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources,...

  12. Historical Reflections on the Work of Commission 4

    NASA Astrophysics Data System (ADS)

    Hohenkerk, Catherine; Arlot, Jean-Eudes; Kaplan, George; Bangert, John A.; Bell, Steven A.; Ferrandiz, Jose M.; Fienga, Agnes; Folkner, William; Lukashova, Marina; Pitjeva, Elena V.; Soma, Mitsuru; Thuillot, William; Urban, Sean E.

    2016-04-01

    Commission 4 was among the first set of commissions formed within the IAU at its founding in 1919. (Commissions were originally called ``Standing Committees.'') During its 96 years of service to the IAU and astronomical community in general, the commission has been fortunate to have been led by many distinguished scientists - see the list of presidents below.

  13. 75 FR 25850 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy...- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information may also be available at http... to CommissionDFO@nuclear.energy.gov , or post comments on the Commission Web site at...

  14. 76 FR 4646 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy... facsimile (202) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information will be... to CommissionDFO@nuclear.energy.gov , or post comments on the Commission Web site at...

  15. 76 FR 64939 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings:...

  16. 77 FR 60980 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting...

  17. 17 CFR 171.28 - Participation by Commission staff.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff...

  18. 16 CFR 1018.23 - Designated Commission employee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Designated Commission employee. 1018.23 Section 1018.23 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ADVISORY COMMITTEE MANAGEMENT Operation of Advisory Committees § 1018.23 Designated Commission employee. (a) The Chairman shall designate a member of the Commission or...

  19. 11 CFR 9036.4 - Commission review of submissions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Commission review of submissions. 9036.4 Section 9036.4 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: PRESIDENTIAL PRIMARY MATCHING FUND REVIEW OF MATCHING FUND SUBMISSIONS AND CERTIFICATION OF PAYMENTS BY COMMISSION § 9036.4 Commission review of...

  20. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... From the Federal Register Online via the Government Publishing Office COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled... oral statements should be addressed to Thomas Luebke, Secretary, U.S. Commission of Fine Arts, at...

  1. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  2. 29 CFR 1626.19 - Filing of Commission lawsuit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Filing of Commission lawsuit. 1626.19 Section 1626.19 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES-AGE DISCRIMINATION IN EMPLOYMENT ACT § 1626.19 Filing of Commission lawsuit. The right of the Commission to file...

  3. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  4. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  5. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  6. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  7. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false The Commission and its offices. 3002.10 Section 3002.10 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.10 The Commission and its offices. (a) The Commissioners. The Postal Regulatory Commission is an independent...

  8. Arizona Commission of Indian Affairs 1986-87 Annual Report.

    ERIC Educational Resources Information Center

    Arizona Commission of Indian Affairs, Phoenix.

    This annual report includes a list of commission membership and staff; a map of state Indian reservations; a table of reservation acreages and populations; a list of commission meetings and those in attendance; a list of 1986-87 commission publications and an agency financial report. A section of "commission highlights" summarizes nine issues…

  9. 76 FR 31390 - Public Hearing and Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing and Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold a public hearing as part of its regular...

  10. 76 FR 72023 - Public Hearing and Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing and Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold a public hearing as part of its regular...

  11. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  12. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  13. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  14. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  15. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  16. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  17. Potential Benefits of Commissioning California Homes

    SciTech Connect

    Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

    2002-01-01

    Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California

  18. 47 CFR 0.463 - Disclosure of Commission records and information in legal proceedings in which the Commission is...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Disclosure of Commission records and information in legal proceedings in which the Commission is a non-party. 0.463 Section 0.463 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General Information Public Information and Inspection of Records § 0.463...

  19. Curriculum for Commissioning Energy Efficient Buildings

    SciTech Connect

    Webster, Lia

    2012-09-30

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  20. North American Commission on Stratigraphic Nomenclature Note 66: records of Stratigraphic Commission, 2003-2013

    USGS Publications Warehouse

    Easton, Robert M.; Catuneanu, Octavian; Donovan, Art D.; Fluegeman, Richard H.; Hamblin, A.P.; Harper, Howard; Lasca, Norman P.; Morrow, Jared R.; Orndorff, Randall C.; Sadler, Peter; Scott, Robert W.; Tew, Berry H.

    2014-01-01

    Note 66 summarizes activities of the North American Commission on Stratigraphic Nomenclature (NACSN) from November 2003 to October 2013 and is condensed from the minutes of the NACSN’s 58th to 68th annual meetings1. The purposes of the Commission are to develop statements of stratigraphic principles,recommend procedures applicable to the classification and nomenclature of stratigraphic and related units, review problems in classifying and naming stratigraphic and related units, and formulate expressions of judgment on these matters.

  1. Commissioning of the PRIOR proton microscope

    DOE PAGESBeta

    Varentsov, D.; Antonov, O.; Bakhmutova, A.; Barnes, C. W.; Bogdanov, A.; Danly, C. R.; Efimov, S.; Endres, M.; Fertman, A.; Golubev, A. A.; et al

    2016-02-18

    Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5–4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This study describes the PRIOR setup as well asmore » the results of the first static and dynamic protonradiography experiments performed at GSI.« less

  2. Initial Commissioning Experience With the LCLS Injector

    SciTech Connect

    Akre, R.; Castro, J.; Ding, Y.; Dowell, D.H.; Emma, P.; Frisch, J.; Gilevich, A.; Hays, G.; Hering, P.; Huang, Z.; Iverson, R.; Krejcik, P.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Rivetta, C.; Saleski, M.; Schmerge, J.F.; Schultz, D.; Turner, J.; Welch, J.; /SLAC /DESY

    2007-11-02

    The Linac Coherent Light Source (LCLS) is a SASE xray Free-Electron Laser (FEL) project presently under construction at SLAC [1]. The injector section, from drive-laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam is taking place during the spring and summer of 2007. The second phase of construction, including second bunch compressor and full linac, will begin later, in the fall of 2007. We report here on experience gained during the first phase of machine commissioning, including RF photocathode gun, linac booster section, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  3. Commissioning Results of the LCLS Injector

    SciTech Connect

    Dowell, D.H.; Akre, R.; Ding, Y.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Huang, Z.; Iverson, R.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Schmerge, J.; Turner, J.; Welch, J.; White, W.; Wu, J.; Frohlich, L.; Limberg, T.; Prat, E.; /DESY

    2007-11-16

    The Linac Coherent Light Source (LCLS) is a SASE xray Free-Electron Laser (FEL) project presently under construction at SLAC. The injector section, from drive-laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam has recently been completed. The second phase of construction, including second bunch compressor and full linac, is planned for 2008. In this paper, we report experimental results and experience gained during the first phase of machine commissioning. This includes the cathode, drive laser, RF photocathode gun, linac booster section, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  4. A History of the Atomic Energy Commission

    DOE R&D Accomplishments Database

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  5. In Brief: Commission for Environmental Cooperation priorities

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2009-11-01

    Members of the Joint Public Advisory Committee of the Commission for Environmental Cooperation (CEC) will host a 1 December live Webcast discussion on environmental priorities the commission should consider during the next 5 years. The priorities will relate to “healthy communities and ecosystems,” “climate change-low-carbon economy,” and “greening the economy in North America.” CEC is an international organization created by Canada, Mexico, and the United States under the North American Agreement on Environmental Cooperation. The meeting, in Los Cabos, Baja California Sur, Mexico, will include a virtual forum to allow online participation. More information will be available soon at http://www.cec.org.

  6. LUCIFER1 commissioning at the LBT

    NASA Astrophysics Data System (ADS)

    Ageorges, N.; Seifert, W.; Jütte, M.; Knierim, V.; Lehmitz, M.; Germeroth, A.; Buschkamp, P.; Polsterer, K.; Pasquali, A.; Naranjo, V.; Gemperlein, H.; Hill, J.; Feiz, C.; Hofmann, R.; Laun, W.; Lederer, R.; Lenzen, R.; Mall, U.; Mandel, H.; Müller, P.; Quirrenbach, A.; Schäffner, L.; Storz, C.; Weiser, P.

    2010-07-01

    LUCIFER 1 is the rst of two identical camera-spectrograph units installed at the LBT (Large Binocular Telescope) on Mount Graham in Arizona. Its commissioning took place between September 2008 and November 2009 and has immediately been followed by science operations since December 2009. LUCIFER has a 4x4 arcminute eld of view. It is equipped with a 2048x2048 pixel HAWAII-2 array, suitable lters (broad-band z, J, H, K & Ks plus 12 medium and narrow band near-infrared lters) and three gratings for spectroscopy for a resolution of up to 15000. LUCIFER has 3 cameras: two specic for seeing limited imaging (the N3.75 camera, with 0.12"/pixel) and spectroscopy (the N1.8 camera, with 0.25"/pixel) and one for diraction limited observations (the N30 camera). We report here about the completed seeing-limited commissioning, thus using only two of the cameras.

  7. Status of the SPIRAL2 injector commissioning

    NASA Astrophysics Data System (ADS)

    Thuillier, T.; Angot, J.; Barué, C.; Bertrand, P.; Biarrotte, J. L.; Canet, C.; Denis, J.-F.; Ferdinand, R.; Flambard, J.-L.; Jacob, J.; Jardin, P.; Lamy, T.; Lemagnen, F.; Maunoury, L.; Osmond, B.; Peaucelle, C.; Roger, A.; Sole, P.; Touzery, R.; Tuske, O.; Uriot, D.

    2016-02-01

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ˜50. A status of its assembly is proposed.

  8. Status of the SPIRAL2 injector commissioning.

    PubMed

    Thuillier, T; Angot, J; Barué, C; Bertrand, P; Biarrotte, J L; Canet, C; Denis, J-F; Ferdinand, R; Flambard, J-L; Jacob, J; Jardin, P; Lamy, T; Lemagnen, F; Maunoury, L; Osmond, B; Peaucelle, C; Roger, A; Sole, P; Touzery, R; Tuske, O; Uriot, D

    2016-02-01

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed. PMID:26931951

  9. Commissioning of the PRIOR proton microscope

    NASA Astrophysics Data System (ADS)

    Varentsov, D.; Antonov, O.; Bakhmutova, A.; Barnes, C. W.; Bogdanov, A.; Danly, C. R.; Efimov, S.; Endres, M.; Fertman, A.; Golubev, A. A.; Hoffmann, D. H. H.; Ionita, B.; Kantsyrev, A.; Krasik, Ya. E.; Lang, P. M.; Lomonosov, I.; Mariam, F. G.; Markov, N.; Merrill, F. E.; Mintsev, V. B.; Nikolaev, D.; Panyushkin, V.; Rodionova, M.; Schanz, M.; Schoenberg, K.; Semennikov, A.; Shestov, L.; Skachkov, V. S.; Turtikov, V.; Udrea, S.; Vasylyev, O.; Weyrich, K.; Wilde, C.; Zubareva, A.

    2016-02-01

    Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5-4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This paper describes the PRIOR setup as well as the results of the first static and dynamic proton radiography experiments performed at GSI.

  10. U.S. Arctic Research Commission

    NASA Astrophysics Data System (ADS)

    “North to the Future” is a well-known slogan in Alaska. This slogan also expresses the spirit with which the U.S. Arctic Research Commission (ARC) has begun its work.The commission was established as a result of Sen. Murkowski's (R-Alaska) Arctic Research and Policy Act of 1984, and its members were appointed by President Reagan last February (Eos, February 26, 1985, p. 91). The ARC has been directed to develop and recommend an integrated Arctic research policy and to work with the concomitantly established Interagency Arctic Research Policy Committee in the formulation of a comprehensive 5-year Arctic research plan (see Figure 1). The Arctic Research and Policy Act designates the National Science Foundation as the lead agency responsible for implementing the policy with other federal agencies; it further requires the preparation of a single, integrated multiagency budget request for Arctic research.

  11. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  12. Division V: Commission 42: Close Binaries

    NASA Astrophysics Data System (ADS)

    Ribas, Ignasi; Richards, Mercedes T.; Rucinski, Slavek; Bradstreet, David H.; Harmanec, Petr; Kaluzny, Janusz; Mikolajewska, Joanna; Munari, Ulisse; Niarchos, Panagiotis; Olah, Katalin; Pribulla, Theodor; Scarfe, Colin D.; Torres, Guillermo

    2015-08-01

    Commission 42 (C42) co-organized, together with Commission 27 (C27) and Division V (Div V) as a whole, a full day of science and business sessions that were held on 24 August 2012. The program included time slots for discussion of business matters related to Div V, C27 and C42, and two sessions of 2 hours each devoted to science talks of interest to both C42 and C27. In addition, we had a joint session between Div IV and Div V motivated by the proposal to reformulate the division structure of the IAU and the possible merger of the two divisions into a new Div G. The current report gives an account of the matters discussed during the business session of C42.

  13. European Commission activities in eHealth.

    PubMed

    Olsson, Silas; Lymberis, Andreas; Whitehouse, Diane

    2004-12-01

    Health-care is an information-intensive and knowledge-demanding sector, which is why eHealth solutions are so important in this field. The European Commission (EC) has been initiating and funding research and development activities regarding Information and Communication Technologies (ICT) for health, or "eHealth", since 1988. These programmes covered priority topics like electronic health-care records, regional and national health networks, telemedicine in homecare and care-at-the-point-of-need to support continuity of care concepts, systems to support people to stay healthy, and systems and tools to support health professionals to work more efficiently and safely on patients. During the 15-year span of the programmes, the European Union (EU) has contributed about 500 million Euro to approximately 400 R&D projects, support activities, best practice and studies covering technical, clinical, ethical, legal, organisational and market issues. eHealth has shown proven benefits in application fields like improved access to care, care at the point-of-need, citizen-centred care, improved quality and cost containment. Such applications were on show at the EU High Level eHealth Conferences in Brussels, Belgium, in 2003, and in Cork, Ireland, in 2004. eHealth is now on the governmental agenda of EU Member States to be implemented on a broader scale. In line with this development, the Commission has taken a number of policy initiatives. A European Union Action Plan for a European eHealth Area was published by the Commission in April 2004 and endorsed by the EU health ministers in June 2004. This means that, for the first time, Europe has a coherent agenda for the implementation of eHealth. This report will concentrate on eHealth activities initiated by the Information Society Directorate-General of the European Commission. PMID:15709306

  14. Indexes to Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  15. Commission 5: Documentation and Astronomical Data

    NASA Astrophysics Data System (ADS)

    Norris, Raymond P.; Ohishi, Masatoshi; Genova, Françoise; Grothkopf, Uta; Malkov, Oleg Yu.; Pence, William D.; Schmitz, Marion; Hanisch, Robert J.; Zhou, Xu

    IAU Commission 5 deals with data management issues, and its working groups and task groups deal specifically with information handling, with data centres and networks, with technical aspects of collection, archiving, storage and dissemination of data, with designations and classification of astronomical objects, with library services, editorial policies, computer communications, ad hoc methodologies, and with various standards, reference frames, etc., FITS, astronomys Flexible Image Transport System, the major data exchange format, is controlled, maintained and updated by the Working Group FITS.

  16. COMMISSIONING CNI PROTON POLARIMETERS IN RHIC.

    SciTech Connect

    HUANG,H.; BRAVAR,A.; LI,Z.; MACKAY,W.W.; MAKDISI,Y.; RESCIA,S.; ROSER,T.; SURROW,B.; BUNCE,G.; DESHPANDE,A.; GOTO,Y.; ET AL

    2002-06-02

    Two polarimeters based on proton carbon elastic scattering in the Coulomb Nuclear Interference (CNI) region have been installed and commissioned in the Blue and Yellow rings of RHIC during the first RHIC polarized proton collider run. Each polarimeter consists of ultra-thin carbon targets and six silicon detectors. With newly developed wave form digitizers, they provide fast and reliable polarization information for both rings.

  17. Division IX / Commission 30 / Working Group

    NASA Astrophysics Data System (ADS)

    Pourbaix, Dimitri; Batten, A.; Fekel, F.; Hartkopf, W.; Levato, H.; Morrell, N.; Tokovinin, A.; Torres, W.; Udry, S.

    2012-04-01

    In Manchester, a WG was set up to work on the implementation of the 9th catalogue of orbits of spectroscopic binaries (SB9), superseding the 8th release of Batten et al. (1989) (SB8). SB9 exists in electronic format only. The web site http://sb9.astro.ulb.ac.be was officially released during Summer 2001. This site is directly accessible from the Commission 26 web site, from BDB (in Besancon) and from the CDS (at least).

  18. Commissioning an Engineering Scale Coal Gasifier

    SciTech Connect

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  19. Commissioning Experience for the SNS Linac

    SciTech Connect

    Aleksandrov, A.; Assadi, S.; Campisi, I.; Chu, P.; Cousineau, S.; Danilov, V.; Dodson, B.G.; Galambos, J.; Jeon, D.; Henderson, S.; Holtkamp, N.; Kravchuk, L.; Kim, S.; Plum, M.; Tanke, E.; Stockli, M.

    2005-06-08

    The Spallation Neutron Source accelerator systems will deliver a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. A 2.5 MeV beam from the Front End is accelerated to 86 MeV in a Drift Tube Linac, then to 185 MeV in a Coupled-Cavity Linac and then to 1 GeV in a Superconducting Linac. The staged beam commissioning of the accelerator complex is proceeding as component installation progresses. The Front End, Drift Tube Linac and part of the Coupled-Cavity Linac have been commissioned at ORNL. The primary design goals of peak current, transverse emittance and beam energy have been achieved. Results and status of the beam commissioning program will be presented.

  20. Commissioning of the CMS Forward Pixel Detector

    SciTech Connect

    Kumar, Ashish; /SUNY, Buffalo

    2008-12-01

    The Compact Muon Solenoid (CMS) experiment is scheduled for physics data taking in summer 2009 after the commissioning of high energy proton-proton collisions at Large Hadron Collider (LHC). At the core of the CMS all-silicon tracker is the silicon pixel detector, comprising three barrel layers and two pixel disks in the forward and backward regions, accounting for a total of 66 million channels. The pixel detector will provide high-resolution, 3D tracking points, essential for pattern recognition and precise vertexing, while being embedded in a hostile radiation environment. The end disks of the pixel detector, known as the Forward Pixel detector, has been assembled and tested at Fermilab, USA. It has 18 million pixel cells with dimension 100 x 150 {micro}m{sup 2}. The complete forward pixel detector was shipped to CERN in December 2007, where it underwent extensive system tests for commissioning prior to the installation. The pixel system was put in its final place inside the CMS following the installation and bake out of the LHC beam pipe in July 2008. It has been integrated with other sub-detectors in the readout since September 2008 and participated in the cosmic data taking. This report covers the strategy and results from commissioning of CMS forward pixel detector at CERN.

  1. Practical Diagnostics for Evaluating Residential Commissioning Metrics

    SciTech Connect

    Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

    2002-06-11

    In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24

  2. The work of commissioning: a multisite case study of healthcare commissioning in England's NHS

    PubMed Central

    Shaw, Sara E; Smith, Judith A; Porter, Alison; Rosen, Rebecca; Mays, Nicholas

    2013-01-01

    Objective To examine the work of commissioning care for people with long-term conditions and the factors inhibiting or facilitating commissioners making service change. Design Multisite mixed methods case study research, combining qualitative analysis of interviews, documents and observation of meetings. Participants Primary care trust managers and clinicians, general practice-based commissioners, National Health Service trust and foundation trust senior managers and clinicians, voluntary sector and local government representatives. Setting Three ‘commissioning communities’ (areas covered by a primary care trust) in England, 2010–2012. Results Commissioning services for people with long-term conditions was a long drawn-out process involving a range of activities and partners. Only some of the activities undertaken by commissioners, such as assessment of local health needs, coordination of healthcare planning and service specification, appeared in the official ‘commissioning cycle’ promoted by the Department of Health. Commissioners undertook a significant range of additional activities focused on reviewing and redesigning services and providing support for implementation of new services. These activities often involved partnership working with providers and other stakeholders and appeared to be largely divorced from contracting and financial negotiations. At least for long-term condition services, the time and effort involved in such work appeared to be disproportionate to the anticipated or likely service gains. Commissioners adopting an incremental approach to service change in defined and manageable areas of work appeared to be more successful in terms of delivering planned changes in service delivery than those attempting to bring about wide-scale change across complex systems. Conclusions Commissioning for long-term condition services challenges the conventional distinction between commissioners and providers with a significant amount of work focused

  3. Investigation of the persistence of new building commissioning

    SciTech Connect

    Potter, Amanda; Friedman, Hannah; Haasl, Tudi; Claridge, David

    2002-03-17

    Commissioning is gaining increasing recognition as a cost-effective strategy for reducing commercial building energy use. Although the success and cost-effectiveness of commissioning projects depends on how well the benefits of commissioning persist over time, this aspect of commissioning is not well understood. The persistence of commissioning benefits was recently studied in a PIER project evaluating ten buildings that were commissioned at building start-up at least two years ago. The researchers examined the commissioning reports, control algorithms, EMCS point measurements, and energy use data, and conducted operator and commissioning provider interviews to investigate the persistence of commissioning benefits. In addition, they conducted site visits in a sample of the buildings. A set of commissioning measures was selected for each building to compare the persistence of benefits. Persistence was measured both qualitatively through a discussion of occupant comfort and decreased maintenance and quantitatively through estimations of energy savings. This paper reports the results of the study. The discussion includes how well the benefits of commissioning persisted over time, reasons for declining performance, and methods for improving persistence. The results provide valuable insight into how to estimate the persistence of commissioning information central to the cost benefit analyses routinely performed for commissioning measures.

  4. Closer view looking to the Interstate Commerce Commission building and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Closer view looking to the Interstate Commerce Commission building and Ariel Rios Federal building - Interstate Commerce Commission, Constitution Avenue between Twelfth and Fourteenth streets, Washington, District of Columbia, DC

  5. 45 CFR 2102.12 - Responses of Commission to submissions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... opportunity to review plans, designs, and specifications in certain particulars at a later stage in their... following the Commission meeting date on which the final design was approved, the Commission's approval...

  6. 45 CFR 2102.12 - Responses of Commission to submissions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... opportunity to review plans, designs, and specifications in certain particulars at a later stage in their... following the Commission meeting date on which the final design was approved, the Commission's approval...

  7. 45 CFR 2102.12 - Responses of Commission to submissions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... opportunity to review plans, designs, and specifications in certain particulars at a later stage in their... following the Commission meeting date on which the final design was approved, the Commission's approval...

  8. 45 CFR 2102.12 - Responses of Commission to submissions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... opportunity to review plans, designs, and specifications in certain particulars at a later stage in their... following the Commission meeting date on which the final design was approved, the Commission's approval...

  9. 45 CFR 2102.12 - Responses of Commission to submissions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... opportunity to review plans, designs, and specifications in certain particulars at a later stage in their... following the Commission meeting date on which the final design was approved, the Commission's approval...

  10. 76 FR 63921 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ...Energy Service Company. FOR MORE INFORMATION CONTACT: Jonathan Fernandez, Office of Energy Market... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy...

  11. Report of the State of Nevada Commission on Nuclear Projects

    SciTech Connect

    1990-12-01

    This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission`s functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts.

  12. 78 FR 2407 - Medicare Payment Advisory Commission Nomination Letters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... From the Federal Register Online via the Government Publishing Office GOVERNMENT ACCOUNTABILITY OFFICE Medicare Payment Advisory Commission Nomination Letters AGENCY: Government Accountability Office... the Medicare Payment Advisory Commission (MedPAC) and gave the Comptroller General responsibility...

  13. 77 FR 42735 - Appointments to the Medicare Payment Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... From the Federal Register Online via the Government Publishing Office GOVERNMENT ACCOUNTABILITY OFFICE Appointments to the Medicare Payment Advisory Commission AGENCY: Government Accountability Office... Medicare Payment Advisory Commission (MedPAC) and gave the Comptroller General responsibility...

  14. 76 FR 81503 - Medicare Payment Advisory Commission Nomination Letters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... From the Federal Register Online via the Government Publishing Office GOVERNMENT ACCOUNTABILITY OFFICE Medicare Payment Advisory Commission Nomination Letters AGENCY: Government Accountability Office... the Medicare Payment Advisory Commission (MedPAC) and gave the Comptroller General responsibility...

  15. 76 FR 5591 - Medicare Payment Advisory Commission Nomination Letters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... From the Federal Register Online via the Government Publishing Office GOVERNMENT ACCOUNTABILITY OFFICE Medicare Payment Advisory Commission Nomination Letters AGENCY: Government Accountability Office... the Medicare Payment Advisory Commission (MedPAC) and gave the Comptroller General responsibility...

  16. Environmental view looking to the Federal Trade Commission Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Environmental view looking to the Federal Trade Commission Building - Federal Trade Commission Building, Bounded by Sixth and Seventh streets, Pennsylvania and Constitution avenues, NW, Washington, District of Columbia, DC

  17. Commission 26: Binary and Multiple Stars

    NASA Astrophysics Data System (ADS)

    Hartkopf, William I.; Allen, Christine; Scarfe, Colin D.; Davis, John; Fekel, Francis C.; Lampens, Patricia; Ling, Josefina F.; Oblak, Edouard; Oswalt, Terry D.

    2007-12-01

    The Business Meeting of Commission 26 took place on 17 August 2006, during the IAU XXVI General Assembly in Prague. It was chaired by its outgoing president, William Hartkopf, and was attended by the following members and guests: H. Abt, C. Allen, W. van Altena, R. Argyle, G. van Belle, D. Bisikalo, A. Bradley, T. ten Brummelaar, D. Cline, T. Corbin, R. Costero, J. Davis, H. Dickel, J. Docobo, J. Echevarria, F. Fekel, E. Griffin, P. Harmanec, W. Hartkopf, P. Lampens, O. Malkov, B. Mason, H. McAlister, T. Oswalt, D. Pourbaix, A. Poveda, D. Raghavan, W. Sanders, C. Scarfe, W. Tango, A. Tokovinin, S. Urban, R. Wilson, and H. Zinnecker.

  18. Commission 22: Meters, Meteorites and Interplanetary Dust

    NASA Astrophysics Data System (ADS)

    Watanabe, Junichi; Jenniskens, Peter; Spurný, Pavel; Borovička, Jiří; Campbell-Brown, Margaret; Consolmagno, Guy; Jopek, Tadeusz; Vaubaillon, Jeremie; Williams, Iwan P.; Zhu, Jin

    2010-05-01

    The business meeting of commission 22 was held at the room 5 in the SulAmerica Convention Center in Rio de Janeiro(14:00-15:30). Fifteen people attended at this meeting:J.Borovička, E.Bowell, G.Consolmagno, D.Green, P. Jenniskens, A. Pellinen-Wannberg, R. Rudawska, J. Watanabe, J. Zhu, P. H. A. Hasselmann, F. Ostroviski, D. A. Oszkiewicz, W. Thuillot, P. Mahajani, and A. Sule. This meeting was managed by Junichi Watanabe, the current C22 Vice-President. The summary of the meeting is described.

  19. Division IX: Commission 30: Radial Velocities

    NASA Astrophysics Data System (ADS)

    Torres, Guillermo; Pourbaix, Dimitri; Udry, Stephane; Marcy, Geoffrey W.; Mathieu, Robert D.; Mazeh, Tsevi; Minniti, Dante; Moutou, Claire; Pepe, Francesco; Turon, Catherine; Zwitter, Tomaz

    2015-08-01

    The meeting was attended by the President and Vice-President of the Commission, along with approximately 15 other members. The President reported on the election of new officers that took place at the end of March 2012, for four new members of the Organizing Committee as well as a new Vice-President, and thanked the outgoing members. Tomaz Zwitter (Slovenia) was elected as the new VP (2012-2015), and the new OC members for the period 2012-2018 are Alceste Bonanos (Greece), Alain Jorissen (Belgium), David Katz (France), and Matthias Steinmetz (Germany). The current VP, Dimitri Pourbaix, became the President through 2015.

  20. Commissioning of the ATLAS pixel detector

    SciTech Connect

    ATLAS Collaboration; Golling, Tobias

    2008-09-01

    The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented.

  1. Division G Commission 35: Stellar Constitution

    NASA Astrophysics Data System (ADS)

    Limongi, Marco; Lattanzio, John C.; Charbonnel, Corinne; Dominguez, Inma; Isern, Jordi; Karakas, Amanda; Leitherer, Claus; Marconi, Marcella; Shaviv, Giora; van Loon, Jacco

    2016-04-01

    Commission 35 (C35), ``Stellar Constitution'', consists of members of the International Astronomical Union whose research spans many aspects of theoretical and observational stellar physics and it is mainly focused on the comprehension of the properties of stars, stellar populations and galaxies. The number of members of C35 increased progressively over the last ten years and currently C35 comprises about 400 members. C35 was part of Division IV (Stars) until 2014 and then became part of Division G (Stars and Stellar Physics), after the main IAU reorganisation in 2015. Four Working Groups have been created over the years under Division IV, initially, and Division G later: WG on Active B Stars, WG on Massive Stars, WG on Abundances in Red Giant and WG on Chemically Peculiar and Related Stars. In the last decade the Commission had 4 presidents, Wojciech Dziembowski (2003-2006), Francesca D'Antona (2006-2009), Corinne Charbonnel (2009-2012) and Marco Limongi (2012-2015), who were assisted by an Organizing Committee (OC), usually composed of about 10 members, all of them elected by the C35 members and holding their positions for three years. The C35 webpage (http://iau-c35.stsci.edu) has been designed and continuously maintained by Claus Leitherer from the Space Telescope Institute, who deserves our special thanks. In addition to the various general information on the Commission structure and activities, it contains links to various resources, of interest for the members, such as stellar models, evolutionary tracks and isochrones, synthetic stellar populations, stellar yields and input physics (equation of state, nuclear cross sections, opacity tables), provided by various groups. The main activity of the C35 OC is that of evaluating, ranking and eventually supporting the proposals for IAU sponsored meetings. In the last decade the Commission has supported several meetings focused on topics more or less relevant to C35. Since the primary aim of this document is to

  2. Fermilab recycler stochastic cooling commissioning and performance

    SciTech Connect

    D. Broemmelsiek; Ralph Pasquinelli

    2003-06-04

    The Fermilab Recycler is a fixed 8 GeV kinetic energy storage ring located in the Fermilab Main Injector tunnel near the ceiling. The Recycler has two roles in Run II. First, to store antiprotons from the Fermilab Antiproton Accumulator so that the antiproton production rate is no longer compromised by large numbers of antiprotons stored in the Accumulator. Second, to receive antiprotons from the Fermilab Tevatron at the end of luminosity periods. To perform each of these roles, stochastic cooling in the Recycler is needed to preserve and cool antiprotons in preparation for transfer to the Tevatron. The commissioning and performance of the Recycler stochastic cooling systems will be reviewed.

  3. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    SciTech Connect

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  4. Division B Commission 5: Documentation and Astronomical Data

    NASA Astrophysics Data System (ADS)

    Hanisch, Robert; Wise, Michael; Ohishi, Masatoshi; Andernach, Heinz; Bishop, Marsha; Egret, Daniel; Griffin, Elizabeth; Kembhavi, Ajit; Murphy, Tara; Pasian, Fabio; Schroeder, Anja; Tody, Douglas

    2016-04-01

    IAU Commission 5, Documentation and Astronomical Data, continued its mission of promoting and supporting sound practices of data management, data dissemination, and data preservation over the past three years. The Commission also prepared its proposal for continuation, with some changes in emphasis, after the IAU's commission restructuring program. Below we report on the activities of the various Working Groups and the one Task Force in Commission 5.

  5. C46 `ASTRONOMY Education and Development': a Peculiar Commission

    NASA Astrophysics Data System (ADS)

    de Greve, Jean-Pierre; García, Beatriz; Gerbaldi, Michèle; Ferlet, Roger; Guinan, Edward; Hearnshaw, John; Jones, Barrie; Marschall, Laurence; Miley, George; Pasachoff, Jay; Ros, Rosa; Stavinschi, Magda; Torres-Peimbert, Silvia

    2016-04-01

    C46 was a Commission of the Executive Committee of the IAU under Division XII (Union-Wide Activities), then after 2012 under Division C (Education, Outreach, and Heritage). It was the only commission dealing exclusively with astronomy education; a previous Commission 38 (Exchange of Astronomers), which allocated travel grants to astronomers who needed them, and a Working Group on the Worldwide Development of Astronomy, have been absorbed by Commission 46.

  6. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  7. 77 FR 43819 - Equity and Excellence Commission; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ...This notice sets forth the schedule and proposed agenda of an up-coming meeting of the Equity and Excellence Commission (Commission). The notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a)(2) of the Federal Advisory Committee Act (FACA) and is intended to notify the public of their opportunity to...

  8. 47 CFR 1.282 - Final decision of the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Final decision of the Commission. 1.282 Section 1.282 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Hearing Proceedings Review Proceedings § 1.282 Final decision of the Commission. (a) After opportunity has been afforded for the filing of proposed findings...

  9. 22 CFR 401.12 - Presentation to Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Presentation to Commission. 401.12 Section 401.12 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE Applications § 401.12 Presentation to Commission. (a) Where one or the other of the Governments on its...

  10. 29 CFR 2200.95 - Oral argument before the Commission.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Oral argument before the Commission. 2200.95 Section 2200.95 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION RULES OF PROCEDURE Posthearing Procedures § 2200.95 Oral argument before the Commission. (a) When ordered. Upon motion of any party, or upon its...

  11. 77 FR 8257 - Sunshine Act Open Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... From the Federal Register Online via the Government Publishing Office FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Open Commission Meeting Date: February 8, 2012. The Federal Communications Commission will hold an Open Meeting on the subjects listed below on Wednesday, February 15, 2012 which...

  12. 47 CFR 3.48 - Cooperation with the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Cooperation with the Commission. 3.48 Section 3.48 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL AUTHORIZATION AND ADMINISTRATION OF... Cooperation with the Commission. Accounting authorities must cooperate fully with the FCC in all...

  13. 47 CFR 3.48 - Cooperation with the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Cooperation with the Commission. 3.48 Section 3.48 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL AUTHORIZATION AND ADMINISTRATION OF... Cooperation with the Commission. Accounting authorities must cooperate fully with the FCC in all...

  14. 47 CFR 3.48 - Cooperation with the Commission.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Cooperation with the Commission. 3.48 Section 3.48 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL AUTHORIZATION AND ADMINISTRATION OF... Cooperation with the Commission. Accounting authorities must cooperate fully with the FCC in all...

  15. 47 CFR 3.48 - Cooperation with the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Cooperation with the Commission. 3.48 Section 3.48 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL AUTHORIZATION AND ADMINISTRATION OF... Cooperation with the Commission. Accounting authorities must cooperate fully with the FCC in all...

  16. 47 CFR 3.48 - Cooperation with the Commission.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Cooperation with the Commission. 3.48 Section 3.48 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL AUTHORIZATION AND ADMINISTRATION OF... Cooperation with the Commission. Accounting authorities must cooperate fully with the FCC in all...

  17. 47 CFR 18.113 - Inspection by Commission representatives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Inspection by Commission representatives. 18.113 Section 18.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT General Information § 18.113 Inspection by Commission representatives....

  18. 47 CFR 18.113 - Inspection by Commission representatives.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Inspection by Commission representatives. 18.113 Section 18.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT General Information § 18.113 Inspection by Commission representatives....

  19. 47 CFR 18.113 - Inspection by Commission representatives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Inspection by Commission representatives. 18.113 Section 18.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT General Information § 18.113 Inspection by Commission representatives....

  20. 47 CFR 18.113 - Inspection by Commission representatives.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Inspection by Commission representatives. 18.113 Section 18.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT General Information § 18.113 Inspection by Commission representatives....

  1. 47 CFR 18.113 - Inspection by Commission representatives.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Inspection by Commission representatives. 18.113 Section 18.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT General Information § 18.113 Inspection by Commission representatives....

  2. 22 CFR 401.26 - Presentation to Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Presentation to Commission. 401.26 Section 401.26 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE References § 401.26 Presentation to Commission. (a) Where a question or matter of difference arising...

  3. 22 CFR 401.12 - Presentation to Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Presentation to Commission. 401.12 Section 401.12 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE Applications § 401.12 Presentation to Commission. (a) Where one or the other of the Governments on its...

  4. 75 FR 24692 - Meeting of the Ozone Transport Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... AGENCY Meeting of the Ozone Transport Commission AGENCY: Environmental Protection Agency (EPA). ACTION... Annual Meeting of the Ozone Transport Commission (OTC). This OTC meeting will explore options available... Transport Commission, 444 North Capitol Street, NW., Suite 638, Washington, DC 20001; (202) 508-3840;...

  5. 77 FR 15089 - Equity and Excellence Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Equity and Excellence Commission Meeting AGENCY: Office for Civil Rights, U.S. Department of Education... up-coming meeting of the Equity and ] Excellence Commission (Commission). The notice also...

  6. 77 FR 37836 - Petition Requesting Commission Action Regarding Crib Bumpers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... From the Federal Register Online via the Government Publishing Office CONSUMER PRODUCT SAFETY COMMISSION 16 CFR Chapter II Petition Requesting Commission Action Regarding Crib Bumpers AGENCY: U.S. Consumer Product Safety Commission. ACTION: Petition for rulemaking. SUMMARY: The U.S. Consumer...

  7. 28 CFR 2.42 - Probation officer's reports to Commission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Probation officer's reports to Commission... § 2.42 Probation officer's reports to Commission. A supervision report shall be submitted by the responsible probation officer to the Commission for each parolee after the completion of 24 months...

  8. 28 CFR 2.42 - Probation officer's reports to Commission.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false Probation officer's reports to Commission... § 2.42 Probation officer's reports to Commission. A supervision report shall be submitted by the responsible probation officer to the Commission for each parolee after the completion of 24 months...

  9. 28 CFR 2.42 - Probation officer's reports to Commission.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false Probation officer's reports to Commission... § 2.42 Probation officer's reports to Commission. A supervision report shall be submitted by the responsible probation officer to the Commission for each parolee after the completion of 24 months...

  10. 28 CFR 2.42 - Probation officer's reports to Commission.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false Probation officer's reports to Commission... § 2.42 Probation officer's reports to Commission. A supervision report shall be submitted by the responsible probation officer to the Commission for each parolee after the completion of 24 months...

  11. 28 CFR 2.42 - Probation officer's reports to Commission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Probation officer's reports to Commission... § 2.42 Probation officer's reports to Commission. A supervision report shall be submitted by the responsible probation officer to the Commission for each parolee after the completion of 24 months...

  12. 77 FR 28639 - Meeting of the CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... MANAGEMENT Meeting of the CFC-50 Commission AGENCY: Office of Personnel Management. ACTION: Notice. SUMMARY: The CFC-50 Advisory Commission will hold its fourth and final meeting on May 29, 2012, at the time and location shown below. The Commission shall advise the Director of the U.S. Office of Personnel...

  13. 16 CFR 4.8 - Costs for obtaining Commission records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Costs for obtaining Commission records. 4.8 Section 4.8 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE MISCELLANEOUS RULES § 4.8 Costs for obtaining Commission records. (a) Definitions. For the purpose of...

  14. 18 CFR 270.503 - Protests to the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Protests to the... PROCEDURES Commission Review of Jurisdictional Agency Determinations § 270.503 Protests to the Commission. (a) Who may file. Any person may file a protest with the Commission with respect to a determination of...

  15. 17 CFR 200.80 - Commission records and information.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 2 2013-04-01 2013-04-01 false Commission records and information. 200.80 Section 200.80 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Information and Requests § 200.80 Commission records and information. (a)(1)...

  16. 77 FR 11519 - Commission Information Collection Activities; Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    .... \\1\\ 60 FR 4859 (25 Jan 1995). In Order No. 659, \\2\\ the Commission modified the reporting... original and two copies with the Secretary of the Commission. \\2\\ 70 FR 35028 (16 Jun 2005). The Commission... public comment on the currently approved information collection, FERC-585, Reporting of Electric...

  17. Arizona Commission of Indian Affairs 1974-75 Annual Report.

    ERIC Educational Resources Information Center

    Arizona Commission of Indian Affairs, Phoenix.

    The Arizona Commission of Indian Affairs 1974-75 Annual Report is issued to inform the Governor, State Legislature, and tribal governments of the proceedings, transactions, findings, and recommendations made by the commission. Included are: (1) a list of commission members, (2) a map showing the Indian reservations in Arizona, (3) a table listing…

  18. 75 FR 7927 - National Commission on Fiscal Responsibility and Reform

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Commission on Fiscal Responsibility and Reform By the authority vested in me as President by the Constitution... Fiscal Responsibility and Reform (Commission). Sec. 2. Membership. The Commission shall be composed of 18..., employees, or agents, or any other person. (Presidential Sig.) THE WHITE HOUSE, February 18, 2010. [FR...

  19. Arizona Commission of Indian Affairs 1990-1991 Annual Report.

    ERIC Educational Resources Information Center

    Arizona Commission of Indian Affairs, Phoenix.

    This annual report describes the goals and activities of the Arizona Commission of Indian Affairs for fiscal year 1990-91. The commission is made up of seven tribal representatives, two non-Indians, and six ex-officio members from state government. In October 1990, the commission held a 2-day Indian Town Hall in Phoenix (Arizona) on the future of…

  20. 75 FR 36647 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ...This notice announces an open meeting of the Blue Ribbon Commission on America's Nuclear Future (the Commission). The Commission was organized pursuant to the Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) (the Act). This notice is provided in accordance with the...

  1. 76 FR 2891 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ...This notice announces an open meeting of the Blue Ribbon Commission on America's Nuclear Future (the Commission). The Commission was organized pursuant to the Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) (the Act). This notice is provided in accordance with the...

  2. 76 FR 23798 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ...This notice announces an open meeting of the Blue Ribbon Commission on America's Nuclear Future (the Commission). The Commission was organized pursuant to the Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) (the Act). This notice is provided in accordance with the...

  3. 75 FR 53685 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ...This notice announces an open meeting of the Blue Ribbon Commission on America's Nuclear Future (the Commission). The Commission was organized pursuant to the Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) (the Act). This notice is provided in accordance with the...

  4. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Disclosure or Production of Information under the Freedom of Information Act (16 CFR part 1015). ... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by...

  5. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Disclosure or Production of Information under the Freedom of Information Act (16 CFR part 1015). ... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by...

  6. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Disclosure or Production of Information under the Freedom of Information Act (16 CFR part 1015). ... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by...

  7. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Disclosure or Production of Information under the Freedom of Information Act (16 CFR part 1015). ... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by...

  8. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Disclosure or Production of Information under the Freedom of Information Act (16 CFR part 1015). ... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by...

  9. 75 FR 3488 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... National Park Service Flight 93 National Memorial Advisory Commission AGENCY: National Park Service. ACTION... meeting of the Flight 93 Advisory Commission. DATES: The public meeting of the Advisory Commission will be... with the Flight 93 Memorial Task Force. Location: The meeting will be held at the Somerset...

  10. 77 FR 24220 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... National Park Service Flight 93 National Memorial Advisory Commission AGENCY: National Park Service... meeting of the Flight 93 Advisory Commission. DATES: The public meeting of the Advisory Commission will be... the Flight 93 National Memorial Office, 109 West Main Street, Suite 104, Somerset, PA 15501....

  11. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Access to Commission resources. 213.5 Section 213... IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in addition to the Office's resources, are available to an eligible small business to the same extent as...

  12. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Access to Commission resources. 213.5 Section 213... IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in addition to the Office's resources, are available to an eligible small business to the same extent as...

  13. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Access to Commission resources. 213.5 Section 213... IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in addition to the Office's resources, are available to an eligible small business to the same extent as...

  14. 76 FR 71449 - Reporting Line for the Commission's Ethics Counsel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Investigation No. OIG-560, Sept. 16, 2011, pp. 116-117. \\2\\ 15 FR 3175, 64 Stat. 1265 (May 24, 1950). These... 200 Reporting Line for the Commission's Ethics Counsel AGENCY: Securities and Exchange Commission... rules to reflect that the Commission's Office of the Ethics Counsel is now a stand-alone Office of...

  15. 75 FR 13757 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Blue Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy... announcing an open meeting of the Blue Ribbon Commission on America's Nuclear Future (the Commission)....

  16. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  17. 32 CFR 9.2 - Establishment of Military Commissions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Establishment of Military Commissions. 9.2 Section 9.2 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR...

  18. 32 CFR 9.2 - Establishment of Military Commissions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Establishment of Military Commissions. 9.2 Section 9.2 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR...

  19. 32 CFR 9.2 - Establishment of Military Commissions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Establishment of Military Commissions. 9.2 Section 9.2 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR...

  20. 78 FR 4366 - Appeal Proceedings Before the Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Commission's minimum internal control standards contained in part 543 (77 FR 58708, Sept. 21, 2012). In its... technical standards contained in part 547 (77 FR 58473, Sept. 21, 2012). III. Development of the Proposed... before the Commission into the current subchapter H (Appeal Proceedings Before the Commission). 77...

  1. 17 CFR 146.9 - Appeals to the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Sunshine Acts compliance staff, Office of the Secretariat, Commodity Futures Trading Commission..., Office of the Secretariat of the petition, unless for good cause shown, the Commission extends the 30-day..., Office of the Secretariat a concise statement setting forth why he disagrees with the Commission's...

  2. 25 CFR 700.473 - Administrative expenditures of the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Administrative expenditures of the Commission. 700.473 Section 700.473 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.473 Administrative expenditures of the Commission....

  3. 76 FR 71558 - Notice of Commission Meeting and Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... From the Federal Register Online via the Government Publishing Office DELAWARE RIVER BASIN COMMISSION Notice of Commission Meeting and Public Hearing Notice is hereby given that the Delaware River... Delaware River Basin Commission fiscal year 2013 operating budget; and (c) a show cause hearing...

  4. 75 FR 37412 - Notice of Commission Meeting and Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... From the Federal Register Online via the Government Publishing Office DELAWARE RIVER BASIN COMMISSION Notice of Commission Meeting and Public Hearing Notice is hereby given that the Delaware River... conducted by the Susquehanna River Basin Commission in partnership with The Nature Conservancy and...

  5. 77 FR 51787 - Notice of Commission Meeting and Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... From the Federal Register Online via the Government Publishing Office ] DELAWARE RIVER BASIN COMMISSION Notice of Commission Meeting and Public Hearing Notice is hereby given that the Delaware River Basin Commission will hold an informal conference followed by a public hearing on Wednesday,...

  6. 78 FR 10160 - Notice of Commission Meeting and Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... From the Federal Register Online via the Government Publishing Office DELAWARE RIVER BASIN COMMISSION Notice of Commission Meeting and Public Hearing Notice is hereby given that the Delaware River Basin Commission will hold a public hearing on Tuesday, March 5, 2013. A business meeting will be...

  7. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA)...

  8. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to...

  9. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets...

  10. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No....

  11. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to...

  12. 7 CFR 6.8 - Representation at Tariff Commission hearings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Representation at Tariff Commission hearings. 6.8... § 6.8 Representation at Tariff Commission hearings. The Department of Agriculture shall be represented at all hearings conducted by the Tariff Commission under section 22 by persons designated by...

  13. 75 FR 2114 - Military Leadership Diversity Commission (MLDC); Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... Office of the Secretary Military Leadership Diversity Commission (MLDC); Meeting AGENCY: Office of the... announces that the Military Leadership Diversity Commission (MLDC) will meet from February 10-12, 2010... Military Leadership Diversity Commission to continue their efforts to address congressional concerns...

  14. 78 FR 3325 - Appointing Authority for Military Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ... of the Secretary 32 CFR Part 18 Appointing Authority for Military Commissions AGENCY: Department of... Authority for Military Commissions. This rule pertains to a military function of the United States and is.... As a result of the enactment of Military Commissions Act of 2009, the Deputy Secretary's issuance...

  15. 32 CFR 9.2 - Establishment of Military Commissions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Establishment of Military Commissions. 9.2 Section 9.2 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR...

  16. 32 CFR 9.2 - Establishment of Military Commissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Establishment of Military Commissions. 9.2 Section 9.2 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR...

  17. Report and Recommendations of the Commission for Occupational Education Excellence.

    ERIC Educational Resources Information Center

    Steuben-Allegany Board of Cooperative Educational Services, Bath, NY.

    The Commission for Occupational Education Excellence was formed by the Steuben-Allegany (New York) Board of Cooperative Educational Services (BOCES). The commission included representatives from schools, businesses, parents and students, labor and teacher unions, other public agencies, postsecondary schools, and the BOCES. The commission's mission…

  18. 77 FR 8094 - Reporting Line for the Commission's Inspector General

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... COMMISSION 17 CFR Part 200 Reporting Line for the Commission's Inspector General AGENCY: Securities and... (2010). These amendments conform the Commission's rules that address the reporting line of the... substantially affect the rights or obligations of non-agency parties, they are not subject to the Small...

  19. The Consumer Product Safety Commission: Benefit or Boondoggle?

    ERIC Educational Resources Information Center

    Feldman, Laurence P.

    1977-01-01

    The Consumer Product Safety Commission has been subject to the criticism of all parties involved in the regulation of the safety of consumer products. Evaluates the Commission's performance, examining both the sources of the Commission's regulatory problems and the extent to which recent amendments to the Consumer Product Safety Act will solve…

  20. 45 CFR 2101.11 - Secretary to the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Secretary to the Commission. 2101.11 Section 2101.11 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION OF FINE ARTS FUNCTIONS AND ORGANIZATION General Organization § 2101.11 Secretary to the Commission. Subject to...