Science.gov

Sample records for configuration management implementation

  1. Configuration management: Phase II implementation guidance

    SciTech Connect

    Not Available

    1994-03-01

    Configuration management (CM) is essential to maintaining an acceptable level of risk to the public, workers, environment, or mission success. It is a set of activities and techniques used to maintain consistency among physical and functional configuration, applicable requirements, and key documents. This document provides guidance for continuing the implementation of CM in a phased and graded manner. It describes a cost-effective approach to documented consistency with requirements, with early emphasis on items most important to safety and environmental protection. It is intended to help responsible line managers and configuration management staff personnel in meeting the Energy Systems configuration management policy standard.

  2. Operational concepts and implementation strategies for the design configuration management process.

    SciTech Connect

    Trauth, Sharon Lee

    2007-05-01

    This report describes operational concepts and implementation strategies for the Design Configuration Management Process (DCMP). It presents a process-based systems engineering model for the successful configuration management of the products generated during the operation of the design organization as a business entity. The DCMP model focuses on Pro/E and associated activities and information. It can serve as the framework for interconnecting all essential aspects of the product design business. A design operation scenario offers a sense of how to do business at a time when DCMP is second nature within the design organization.

  3. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect

    GARRISON, R.C.

    2000-11-28

    This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.

  4. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  5. Tank waste remediation system configuration management plan

    SciTech Connect

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  6. Software Configuration Management Guidebook

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The growth in cost and importance of software to NASA has caused NASA to address the improvement of software development across the agency. One of the products of this program is a series of guidebooks that define a NASA concept of the assurance processes which are used in software development. The Software Assurance Guidebook, SMAP-GB-A201, issued in September, 1989, provides an overall picture of the concepts and practices of NASA in software assurance. Lower level guidebooks focus on specific activities that fall within the software assurance discipline, and provide more detailed information for the manager and/or practitioner. This is the Software Configuration Management Guidebook which describes software configuration management in a way that is compatible with practices in industry and at NASA Centers. Software configuration management is a key software development process, and is essential for doing software assurance.

  7. Configuration Management Plan for K Basins

    SciTech Connect

    Weir, W.R.; Laney, T.

    1995-01-27

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.

  8. NASA's acquisition requirements for configuration management

    NASA Technical Reports Server (NTRS)

    Coletta, Mark P.

    1992-01-01

    A viewgraph presentation on NASA's acquisition requirements for configuration management (CM) goes over CM requirements for single mission and multi-mission orientations, CM automation and CALS implementation initiatives, NASA implementation of DOD standards and DID's (data item descriptions), impact of traceability in NASA CM support, NASA's CM efforts in modifying/upgrading equipment, and CM control of multi-vendor hardware.

  9. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  10. Device configuration-management system

    SciTech Connect

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information.

  11. Configuration Management at NASA

    NASA Technical Reports Server (NTRS)

    Doreswamy, Rajiv

    2013-01-01

    NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

  12. Sandia software guidelines, Volume 4: Configuration management

    SciTech Connect

    Not Available

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  13. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  14. NCCDS configuration management process improvement

    NASA Technical Reports Server (NTRS)

    Shay, Kathy

    1993-01-01

    By concentrating on defining and improving specific Configuration Management (CM) functions, processes, procedures, personnel selection/development, and tools, internal and external customers received improved CM services. Job performance within the section increased in both satisfaction and output. Participation in achieving major improvements has led to the delivery of consistent quality CM products as well as significant decreases in every measured CM metrics category.

  15. The configuration management program for the Emergency Management Support System

    SciTech Connect

    Probasco, K M; Stephan, E G

    1991-08-01

    Emergency response software is used increasingly by the US Department of Energy's (DOE's) Emergency Management Project (EMP) personnel at Hanford Site. This software must be reliable, of high quality, and capable of performing critical functions to support assessment of actual or potential consequences of any hazardous accidents onsite or events having potential offsite impacts. To better control the software and ensure its suitability for use as a tool to protect employees, the public, and environment, a method for specifying and certifying its capabilities and documenting its development and implementation was needed. A team of EMP staff, composed of personnel from Pacific Northwest Laboratory (PNL) and Boeing Computer Services- Richland (BCSR) under the direction of PNL EMP, responded to this need by developing a software configuration management program (CMP). This report documents the development of the CMP, including the strategies upon which the CMP is based, and describes the program as it has been implemented for EMS System software. The program relies on the integration of its three primary elements: the configuration management staff, tools, and process. Configuration management staff run the program, using specially designed configuration management forms to guide, document, and track the life cycle of the software. The configuration management process itself is reflected in the instructive forms and summarized in flowcharts representing each phase of the process -- from requirements specification through implementation and maintenance. 7 refs., 9 figs., 1 tab.

  16. Configuration Management Process Assessment Strategy

    NASA Technical Reports Server (NTRS)

    Henry, Thad

    2014-01-01

    Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

  17. Configuration management for hardware-software codesign

    SciTech Connect

    Kobialka, H.U.; Gnedina, A.; Wilberg, J.

    1996-12-31

    Configuration Management (CM) has a long tradition in the area of software development. In other areas CM is still more a promise than a product to be used. During HW/SW codesign a large design space has to be explored in order to find the optimal combination of software and hardware. This is an optimization process where many variants (> 1000) and associated analysis results have to be maintained for later exploration. Each variant consists of hundreds of files. This paper describes the CM requirements we encountered when introducing CM in a HW/SW codesign project. CM support for HW/SW codesign has been implemented in the ADDD development environment.

  18. autokonf - A Configuration Script Generator Implemented in Perl

    SciTech Connect

    Reus, J F

    2005-01-12

    This paper discusses configuration scripts in general and the scripting language issues involved. A brief description of GNU autoconf is provided along with a contrasting overview of autokonf, a configuration script generator implemented in Perl, whose macros are implemented in Perl, generating a configuration script in Perl. It is very portable, easily extensible, and readily mastered.

  19. Context based configuration management system

    NASA Technical Reports Server (NTRS)

    Gawdiak, Yuri O. (Inventor); Gurram, Mohana M. (Inventor); Maluf, David A. (Inventor); Mederos, Luis A. (Inventor)

    2010-01-01

    A computer-based system for configuring and displaying information on changes in, and present status of, a collection of events associated with a project. Classes of icons for decision events, configurations and feedback mechanisms, and time lines (sequential and/or simultaneous) for related events are displayed. Metadata for each icon in each class is displayed by choosing and activating the corresponding icon. Access control (viewing, reading, writing, editing, deleting, etc.) is optionally imposed for metadata and other displayed information.

  20. Configuration management plan for the Objective Supply Capability Adaptive Resdesign (OSCAR) project

    SciTech Connect

    Rasch, K.A.; Reid, R.W.

    1997-02-01

    The Configuration Management Plan for the Object Supply Capability Adaptive Redesign (OSCAR) documents the methods used for the OSCAR project to implement configuration management and control. Specific areas addressed include the establishment of baselines and change control procedures.

  1. Configuration Management File Manager Developed for Numerical Propulsion System Simulation

    NASA Technical Reports Server (NTRS)

    Follen, Gregory J.

    1997-01-01

    One of the objectives of the High Performance Computing and Communication Project's (HPCCP) Numerical Propulsion System Simulation (NPSS) is to provide a common and consistent way to manage applications, data, and engine simulations. The NPSS Configuration Management (CM) File Manager integrated with the Common Desktop Environment (CDE) window management system provides a common look and feel for the configuration management of data, applications, and engine simulations for U.S. engine companies. In addition, CM File Manager provides tools to manage a simulation. Features include managing input files, output files, textual notes, and any other material normally associated with simulation. The CM File Manager includes a generic configuration management Application Program Interface (API) that can be adapted for the configuration management repositories of any U.S. engine company.

  2. Risk Management Implementation Tool

    NASA Technical Reports Server (NTRS)

    Wright, Shayla L.

    2004-01-01

    Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.

  3. Software control and system configuration management - A process that works

    NASA Technical Reports Server (NTRS)

    Petersen, K. L.; Flores, C., Jr.

    1983-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  4. Configuration and Data Management Process and the System Safety Professional

    NASA Technical Reports Server (NTRS)

    Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.

  5. Configuration management; Operating power station electrical systems

    SciTech Connect

    Beavers, R.R.; Sumiec, K.F. )

    1989-01-01

    Increasing regulatory and industry attention has been focused on properly controlling electrical design changes. These changes can be controlled by using configuration management techniques. Typically, there are ongoing modifications to various process systems or additions due to new requirements at every power plant. Proper control of these changes requires that an organized method be used to ensure that all important parameters of the electrical auxiliary systems are analyzed and that these parameters are evaluated accurately. This process, commonly referred to as configuration management, is becoming more important on both fossil and nuclear plants. Recent NRC- and utility-initiated inspections have identified problems due to incomplete analysis of changes to electrical auxiliary systems at nuclear stations.

  6. Configuration control of redundant manipulators - Theory and implementation

    NASA Technical Reports Server (NTRS)

    Seraji, Homayoun

    1989-01-01

    A simple approach for controlling the manipulator configuration over the entire motion is presented, based on augmentation of the manipulator forward kinematics. User-defined kinematic functions and the end-effector Cartesian coordinates are combined to form a set of task-related configuration variables as generalized coordinates for the manipulator. A task-based adaptive scheme is then utilized to control the configuration variables and achieve tracking of the desired reference trajectories. This achieves the desired end-effector motion while utilizing redundancy to achieve any additional task. Simulation results for a direct-drive two-link arm are given to illustrate the proposed control scheme. The scheme has also been implemented for real-time control of three links of a PUMA 560 industrial robot. The simulation and experimental results validate the configuration control scheme and demonstrate its capabilities for performing various realistic tasks.

  7. Configuration management plan for the GENII software

    SciTech Connect

    Rittmann, P.D.

    1994-12-12

    The GENII program calculates doses from radionuclides released into the environment for a variety of possible exposure scenarios. The user prepares an input data file with the necessary modelling assumptions and parameters. The program reads the user`s input file, computes the necessary doses and stores these results in an output file. The output file also contains a listing of the user`s input and gives the title lines from the data libraries which are accessed in the course of the calculations. The purpose of this document is to provide users of the GENII software with the configuration controls which are planned for use by WHC in accordance with WHC-CM-3-10. The controls are solely for WHC employees. Non-WHC individuals are not excluded, but no promise is made or implied that they will be informed of errors or revisions to the software. The configuration controls cover the GENII software, the GENII user`s guide, the list of GENII users at WHC, and the backup copies. Revisions to the software must be approved prior to distribution in accordance with this configuration management plan.

  8. HotSpot Software Configuration Management Plan

    SciTech Connect

    Walker, H; Homann, S G

    2009-03-12

    This Software Configuration Management Plan (SCMP) describes the software configuration management procedures used to ensure that the HotSpot dispersion model meets the requirements of its user base, which includes: (1) Users of the PC version of HotSpot for consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. This plan is intended to meet Critical Recommendations 1 and 3 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  9. Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System

    SciTech Connect

    MCDANIEL, K.S.

    1999-08-31

    Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.

  10. Configuration Management Plan for the Tank Farm Contractor

    SciTech Connect

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  11. Mac configuration management at the Los Alamos National Laboratory

    SciTech Connect

    Marcus, Allan B

    2010-01-01

    The Los Alamos National Laboratory (LANL) had a need for central configuration management of non-Windows computers. LANL has three to five thousand Macs and an equal number of Linux based systems. The primary goal was to be able to inventory all non-windows systems and patch Mc OS X systems. LANL examined a number of commercial and open source solutions and ultimately selected Puppet. This paper will discuss why we chose Puppet, how we implemented it, and some lessons we learned along the way.

  12. Throughput Benefit Assessment for Tactical Runway Configuration Management (TRCM)

    NASA Technical Reports Server (NTRS)

    Phojanamongkolkij, Nipa; Oseguera-Lohr, Rosa M.; Lohr, Gary W.; Fenbert, James W.

    2014-01-01

    The System-Oriented Runway Management (SORM) concept is a collection of needed capabilities focused on a more efficient use of runways while considering all of the factors that affect runway use. Tactical Runway Configuration Management (TRCM), one of the SORM capabilities, provides runway configuration and runway usage recommendations, monitoring the active runway configuration for suitability given existing factors, based on a 90 minute planning horizon. This study evaluates the throughput benefits using a representative sample of today's traffic volumes at three airports: Memphis International Airport (MEM), Dallas-Fort Worth International Airport (DFW), and John F. Kennedy International Airport (JFK). Based on this initial assessment, there are statistical throughput benefits for both arrivals and departures at MEM with an average of 4% for arrivals, and 6% for departures. For DFW, there is a statistical benefit for arrivals with an average of 3%. Although there is an average of 1% benefit observed for departures, it is not statistically significant. For JFK, there is a 12% benefit for arrivals, but a 2% penalty for departures. The results obtained are for current traffic volumes and should show greater benefit for increased future demand. This paper also proposes some potential TRCM algorithm improvements for future research. A continued research plan is being worked to implement these improvements and to re-assess the throughput benefit for today and future projected traffic volumes.

  13. SAPHIRE 8 Software Configuration Management Plan

    SciTech Connect

    Curtis Smith

    2010-01-01

    The INL software developers use version control for both the formally released SAPHIRE versions, as well as for source code. For each formal release of the software, the developers perform an acceptance test: the software must pass a suite of automated tests prior to official release. Each official release of SAPHIRE is assigned a unique version identifier. The release is bundled into a standard installation package for easy and consistent set-up by individual users. Included in the release is a list of bug fixes and new features for the current release, as well as a history of those items for past releases. Each formal release of SAPHIRE will have passed an acceptance test. In addition to assignment of a unique version identifier for an official software release, each source code file is kept in a controlled library. Source code is a collection of all the computer instructions written by developers to create the finished product. The library is kept on a server, where back-ups are regularly made. This document describes the configuration management approach used as part of the SAPHIRE development.

  14. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management. Part 1

    SciTech Connect

    Not Available

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management.

  15. SW Configuration Management Practises for an Incremental Space SW Development Process

    NASA Astrophysics Data System (ADS)

    Tipaldi, Massimo; Reger, Florian; Bruggmann, Jorg; Dehnhardt, Erik; Bruenjes, Bernhard

    2014-08-01

    This paper describes software configuration management practices featuring an incremental software development approach, referred to as "robust software feedback model". A proper SW configuration process is fundamental for the correct implementation of whatever SW development approach and can guarantee its effectiveness. Special attention is given to the SW versioning rules, the SW repository structure and related usage from both the development and testing standpoint.

  16. Evaluating the Potential of Commercial GIS for Accelerator Configuration Management

    SciTech Connect

    T.L. Larrieu; Y.R. Roblin; K. White; R. Slominski

    2005-10-10

    The Geographic Information System (GIS) is a tool used by industries needing to track information about spatially distributed assets. A water utility, for example, must know not only the precise location of each pipe and pump, but also the respective pressure rating and flow rate of each. In many ways, an accelerator such as CEBAF (Continuous Electron Beam Accelerator Facility) can be viewed as an ''electron utility''. Whereas the water utility uses pipes and pumps, the ''electron utility'' uses magnets and RF cavities. At Jefferson lab we are exploring the possibility of implementing ESRI's ArcGIS as the framework for building an all-encompassing accelerator configuration database that integrates location, configuration, maintenance, and connectivity details of all hardware and software. The possibilities of doing so are intriguing. From the GIS, software such as the model server could always extract the most-up-to-date layout information maintained by the Survey & Alignment for lattice modeling. The Mechanical Engineering department could use ArcGIS tools to generate CAD drawings of machine segments from the same database. Ultimately, the greatest benefit of the GIS implementation could be to liberate operators and engineers from the limitations of the current system-by-system view of machine configuration and allow a more integrated regional approach. The commercial GIS package provides a rich set of tools for database-connectivity, versioning, distributed editing, importing and exporting, and graphical analysis and querying, and therefore obviates the need for much custom development. However, formidable challenges to implementation exist and these challenges are not only technical and manpower issues, but also organizational ones. The GIS approach would crosscut organizational boundaries and require departments, which heretofore have had free reign to manage their own data, to cede some control and agree to a centralized framework.

  17. Configuration Management of an Optimization Application in a Research Environment

    NASA Technical Reports Server (NTRS)

    Townsend, James C.; Salas, Andrea O.; Schuler, M. Patricia

    1999-01-01

    Multidisciplinary design optimization (MDO) research aims to increase interdisciplinary communication and reduce design cycle time by combining system analyses (simulations) with design space search and decision making. The High Performance Computing and Communication Program's current High Speed Civil Transport application, HSCT4.0, at NASA Langley Research Center involves a highly complex analysis process with high-fidelity analyses that are more realistic than previous efforts at the Center. The multidisciplinary processes have been integrated to form a distributed application by using the Java language and Common Object Request Broker Architecture (CORBA) software techniques. HSCT4.0 is a research project in which both the application problem and the implementation strategy have evolved as the MDO and integration issues became better understood. Whereas earlier versions of the application and integrated system were developed with a simple, manual software configuration management (SCM) process, it was evident that this larger project required a more formal SCM procedure. This report briefly describes the HSCT4.0 analysis and its CORBA implementation and then discusses some SCM concepts and their application to this project. In anticipation that SCM will prove beneficial for other large research projects, the report concludes with some lessons learned in overcoming SCM implementation problems for HSCT4.0.

  18. Software Configuration Management Plan for the Sodium Removal System

    SciTech Connect

    HILL, L.F.

    2000-03-06

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.

  19. Implementation of reconfigurable optical add-drop multiplexer management system

    NASA Astrophysics Data System (ADS)

    Lei, Lei; Huang, Zhaoxiang; Zhang, Minglun; Huang, Yongqing; Li, Ling

    2005-11-01

    A detailed management system implementation process for a realized reconfigurable optical add-drop multiplexer (ROADM) is presented. The ROADM is capable of freely adding/dropping any of 40 wavelengths within C-band at ITU_T standard spacing according to the user's configuration demand from the management system. SNMP and Java language are used in the deployment of the management system. The management system framework and its implementation process are introduced in template-based form, so they are generic enough to be deployed in managing such reconfigurable elements in optical transport network, and be of value to others who are contemplating managing such kind of reconfigurable elements.

  20. Integrated Advanced Sounding Unit-A (AMSU-A). Configuration Management Plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1996-01-01

    The purpose of this plan is to identify the baseline to be established during the development life cycle of the integrated AMSU-A, and define the methods and procedures which Aerojet will follow in the implementation of configuration control for each established baseline. Also this plan establishes the Configuration Management process to be used for the deliverable hardware, software, and firmware of the Integrated AMSU-A during development, design, fabrication, test, and delivery.

  1. How Configuration Management Helps Projects Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  2. Configuration management program plan for Hanford site systems engineering

    SciTech Connect

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  3. Tank monitor and control system (TMACS) software configuration management plan

    SciTech Connect

    GLASSCOCK, J.A.

    1999-05-13

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments.

  4. Light Duty Utility Arm computer software configuration management plan

    SciTech Connect

    Philipp, B.L.

    1998-09-14

    This plan describes the configuration management for the Light Duty Utility Arm robotic manipulation arm control software. It identifies the requirement, associated documents, and the software control methodology. The Light Duty Utility Ann (LDUA) System is a multi-axis robotic manipulator arm and deployment vehicle, used to perform surveillance and characterization operations in support of remediation of defense nuclear wastes currently stored in the Hanford Underground Storage Tanks (USTs) through the available 30.5 cm (12 in.) risers. This plan describes the configuration management of the LDUA software.

  5. Software control and system configuration management: A systems-wide approach

    NASA Technical Reports Server (NTRS)

    Petersen, K. L.; Flores, C., Jr.

    1984-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  6. Implementation of Knowledge Management in Organizations

    ERIC Educational Resources Information Center

    Winkler, Katrin; Mandl, Heinz

    2007-01-01

    In the context of learning implementation of new ideas e.g. knowledge management in organizations often is neglected. Concerning knowledge management measures we demonstrate its implementation in organizations. A theoretical framework was developed showing the necessary basic conditions for implementing knowledge management. Subsequently we…

  7. Search Hanford accessible reports electronically system configuration management plan

    SciTech Connect

    White, E.L.

    1995-01-01

    This Software Configuration Management Plan (SCMP) provides the requirements for control of the Search Hanford Accessible Reports Electronically (SHARE) software and documentation. The SHARE system consists of the TOPIC Text Search and Retrieval software and the programs necessary to extract information from other sources to be placed in SHARE.

  8. Data base management system configuration specification. [computer storage devices

    NASA Technical Reports Server (NTRS)

    Neiers, J. W.

    1979-01-01

    The functional requirements and the configuration of the data base management system are described. Techniques and technology which will enable more efficient and timely transfer of useful data from the sensor to the user, extraction of information by the user, and exchange of information among the users are demonstrated.

  9. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  10. Earth Observing System (EOS)/Advanced Microwave Sounding Unit A (AMSU-A) configuration management plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1994-01-01

    This plan describes methods and procedures Aerojet will follow in the implementation of configuration control for each established baseline. The plan is written in response to the GSFC EOS CM Plan 420-02-02, dated January 1990, and also meets he requirements specified in DOD-STD-480, DOD-D 1000B, MIL-STD-483A, and MIL-STD-490B. The plan establishes the configuration management process to be used for the deliverable hardware, software, and firmware of the EOS/AMSU-A during development, design, fabrication, test, and delivery. This revision includes minor updates to reflect Aerojet's CM policies.

  11. The Network Configuration of an Object Relational Database Management System

    NASA Technical Reports Server (NTRS)

    Diaz, Philip; Harris, W. C.

    2000-01-01

    The networking and implementation of the Oracle Database Management System (ODBMS) requires developers to have knowledge of the UNIX operating system as well as all the features of the Oracle Server. The server is an object relational database management system (DBMS). By using distributed processing, processes are split up between the database server and client application programs. The DBMS handles all the responsibilities of the server. The workstations running the database application concentrate on the interpretation and display of data.

  12. Virtual Network Configuration Management System for Data Center Operations and Management

    NASA Astrophysics Data System (ADS)

    Okita, Hideki; Yoshizawa, Masahiro; Uehara, Keitaro; Mizuno, Kazuhiko; Tarui, Toshiaki; Naono, Ken

    Virtualization technologies are widely deployed in data centers to improve system utilization. However, they increase the workload for operators, who have to manage the structure of virtual networks in data centers. A virtual-network management system which automates the integration of the configurations of the virtual networks is provided. The proposed system collects the configurations from server virtualization platforms and VLAN-supported switches, and integrates these configurations according to a newly developed XML-based management information model for virtual-network configurations. Preliminary evaluations show that the proposed system helps operators by reducing the time to acquire the configurations from devices and correct the inconsistency of operators' configuration management database by about 40 percent. Further, they also show that the proposed system has excellent scalability; the system takes less than 20 minutes to acquire the virtual-network configurations from a large scale network that includes 300 virtual machines. These results imply that the proposed system is effective for improving the configuration management process for virtual networks in data centers.

  13. Configuring the Structure and Administration of Learning Management

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2005-01-01

    Purpose: Experience shows that there are problems arising from the implementation of learning management systems (LMS). Indications are that they are too e-learning technology driven, emphasising the virtual component and neglecting the precursory development of a vibrant and committed formal learning organisation culture and infrastructure. This…

  14. Benefits Assessment for Tactical Runway Configuration Management Tool

    NASA Technical Reports Server (NTRS)

    Oseguera-Lohr, Rosa; Phojanamongkolkij, Nipa; Lohr, Gary; Fenbert, James W.

    2013-01-01

    The Tactical Runway Configuration Management (TRCM) software tool was developed to provide air traffic flow managers and supervisors with recommendations for airport configuration changes and runway usage. The objective for this study is to conduct a benefits assessment at Memphis (MEM), Dallas Fort-Worth (DFW) and New York's John F. Kennedy (JFK) airports using the TRCM tool. Results from simulations using the TRCM-generated runway configuration schedule are compared with results using historical schedules. For the 12 days of data used in this analysis, the transit time (arrival fix to spot on airport movement area for arrivals, or spot to departure fix for departures) for MEM departures is greater (7%) than for arrivals (3%); for JFK, there is a benefit for arrivals (9%) but not for departures (-2%); for DFW, arrivals show a slight benefit (1%), but this is offset by departures (-2%). Departure queue length benefits show fewer aircraft in queue for JFK (29%) and MEM (11%), but not for DFW (-13%). Fuel savings for surface operations at MEM are seen for both arrivals and departures. At JFK there are fuel savings for arrivals, but these are offset by increased fuel use for departures. In this study, no surface fuel benefits resulted for DFW. Results suggest that the TRCM algorithm requires modifications for complex surface traffic operations that can cause taxi delays. For all three airports, the average number of changes in flow direction (runway configuration) recommended by TRCM was many times greater than the historical data; TRCM would need to be adapted to a particular airport's needs, to limit the number of changes to acceptable levels. The results from this analysis indicate the TRCM tool can provide benefits at some high-capacity airports. The magnitude of these benefits depends on many airport-specific factors and would require adaptation of the TRCM tool; a detailed assessment is needed prior to determining suitability for a particular airport.

  15. Grading standards, prepared by the Configuration Management Office

    SciTech Connect

    Cort, G.; Donahue, S.; Frank, J.; Perkins, B.; Wrye, J.

    1994-01-28

    This report describes the grading methodology used by the organization to determine the required levels of configuration management for all controlled elements that are part of the nuclear facility and its operation. The goal is to have a flexible grading system that accurately reflects the overall operational environment. The grading methodology should identify which items, processes, and information should be incorporated into facility baselines as controlled elements; and specify the level of formality that should be applied to activities that employ or impact these controlled elements. Evaluation categories include the following: radiological damage to workers; toxicological damage to workers; industrial safety; environmental damage; property damage; facility availability; cost effect; reputation; and commitments.

  16. A new flight control and management system architecture and configuration

    NASA Astrophysics Data System (ADS)

    Kong, Fan-e.; Chen, Zongji

    2006-11-01

    The advanced fighter should possess the performance such as super-sound cruising, stealth, agility, STOVL(Short Take-Off Vertical Landing),powerful communication and information processing. For this purpose, it is not enough only to improve the aerodynamic and propulsion system. More importantly, it is necessary to enhance the control system. A complete flight control system provides not only autopilot, auto-throttle and control augmentation, but also the given mission management. F-22 and JSF possess considerably outstanding flight control system on the basis of pave pillar and pave pace avionics architecture. But their control architecture is not enough integrated. The main purpose of this paper is to build a novel fighter control system architecture. The control system constructed on this architecture should be enough integrated, inexpensive, fault-tolerant, high safe, reliable and effective. And it will take charge of both the flight control and mission management. Starting from this purpose, this paper finishes the work as follows: First, based on the human nervous control, a three-leveled hierarchical control architecture is proposed. At the top of the architecture, decision level is in charge of decision-making works. In the middle, organization & coordination level will schedule resources, monitor the states of the fighter and switch the control modes etc. And the bottom is execution level which holds the concrete drive and measurement; then, according to their function and resources all the tasks involving flight control and mission management are sorted to individual level; at last, in order to validate the three-leveled architecture, a physical configuration is also showed. The configuration is distributed and applies some new advancement in information technology industry such line replaced module and cluster technology.

  17. Smart Management in Effective Schools: Effective Management Configurations in General and Vocational Education in the Netherlands

    ERIC Educational Resources Information Center

    Hofman, W. H. Adriaan; Hofman, Roelande H.

    2011-01-01

    Purpose: In this study the authors focus on different (configurations of) leadership or management styles in schools for general and vocational education. Findings: Using multilevel (students and schools) analyses, strong differences in effective management styles between schools with different student populations were observed. Conclusions: The…

  18. Improved implementation and application of the individually selecting configuration interaction method.

    PubMed

    Stampfuss, P; Wenzel, W

    2005-01-01

    We report on the progress of our implementation of the configuration-selecting multireference configuration interaction method on massively parallel architectures with distributed memory, which now permits the treatment of Hilbert spaces of dimension O(10(12)). Of these about 50,000,000 can be selected in the variational subspace. We provide scaling data for the running time of the code for the IBM/SP3 and the CRAY-T3E. We present benchmark results for two selected applications: the energetics of the isomers of dinitrosoethylene and the benchmark results for the ring closure reaction of enediyene. PMID:15638575

  19. Implementing a Domain Specific Language to configure and run LHCb Continuous Integration builds

    NASA Astrophysics Data System (ADS)

    Clemencic, M.; Couturier, B.

    2015-12-01

    The new LHCb nightly build system described at CHEP 2013 was limited by the use of JSON files for its configuration. JSON had been chosen as a temporary solution to maintain backward compatibility towards the old XML format by means of a translation function. Modern languages like Python leverage on meta-programming techniques to enable the development of Domain Specific Languages (DSLs). In this contribution we will present the advantages of such techniques and how they have been used to implement a DSL that can be used to both describe the configuration of the LHCb Nightly Builds and actually operate them.

  20. Total quality management implementation guidelines

    SciTech Connect

    Not Available

    1993-12-01

    These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

  1. Implementing a computerized operating room management system.

    PubMed

    Choy, M

    1991-01-01

    The Queen's Medical Center implemented a computerized operating room management system in 1987 that includes surgery scheduling, intraoperative recording, and resource tracking. In addition to the important functional components, the system provides management with a better tool for decision-making. The purpose of this article is to describe this implementation. Background is provided to identify the manual system's deficiencies followed by the anticipated benefits of the computer system. The paper concentrates on Queen's implementation experiences in coding the surgical procedure information, confronting staff anxiety, managing the changing roles of the staff and providing adequate resources. Minimum requirements for a successful implementation include designating an effective project leader, assigning system responsibilities to the user, relieving all operational responsibilities from key members of the project team and providing adequate resources to support the system. PMID:1760543

  2. Ground Systems Development Environment (GSDE) software configuration management

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    This report presents a review of the software configuration management (CM) plans developed for the Space Station Training Facility (SSTF) and the Space Station Control Center. The scope of the CM assessed in this report is the Systems Integration and Testing Phase of the Ground Systems development life cycle. This is the period following coding and unit test and preceding delivery to operational use. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the SSTF and the SSCC, and the target systems for SSCC and SSTF. This is the last report in the series. The focus of this report is on the CM plans developed by the contractors for the Mission Systems Contract (MSC) and the Training Systems Contract (TSC). CM requirements are summarized and described in terms of operational software development. The software workflows proposed in the TSC and MSC plans are reviewed in this context, and evaluated against the CM requirements defined in earlier study reports. Recommendations are made to improve the effectiveness of CM while minimizing its impact on the developers.

  3. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  4. Implementing a Microcomputer Database Management System.

    ERIC Educational Resources Information Center

    Manock, John J.; Crater, K. Lynne

    1985-01-01

    Current issues in selecting, structuring, and implementing microcomputer database management systems in research administration offices are discussed, and their capabilities are illustrated with the system used by the University of North Carolina at Wilmington. Trends in microcomputer technology and their likely impact on research administration…

  5. Implementation of a Computerized Maintenance Management System

    NASA Technical Reports Server (NTRS)

    Shen, Yong-Hong; Askari, Bruce

    1994-01-01

    A primer Computerized Maintenance Management System (CMMS) has been established for NASA Ames pressure component certification program. The CMMS takes full advantage of the latest computer technology and SQL relational database to perform periodic services for vital pressure components. The Ames certification program is briefly described and the aspects of the CMMS implementation are discussed as they are related to the certification objectives.

  6. Management Planning Requirements for Implementing Office Automation.

    ERIC Educational Resources Information Center

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  7. Now's the Time: Implementing Performance Management

    ERIC Educational Resources Information Center

    Legutko, Lee V.

    2012-01-01

    During the past several years, school systems have implemented a variety of organizational improvement initiatives, such as Six Sigma, Balanced Scorecards, Baldrige Criteria, activity-based costing, and managing for results. Unfortunately, evidence of sustained success is fleeting as school districts remain trapped in a time warp of command,…

  8. Implementing Plain Language: A Manager's Guide.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto.

    Drawn from the experience of various ministries and departments in governments across Canada, this guide is meant to be a practical guide in implementing plain language for managers in the Ontario (Canada) government. The guide describes how to use plain language in planning, writing, designing, and editing forms and documents, and how to set up…

  9. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  10. Real estate management program implementation handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook provides a ready reference to pertinent policy and guidance for the management of real estate activities in NASA. Real property means buildings, structures, utility systems, and land, along with its permanently connected appurtenances and improvements. The Real Estate Management Program is designed to provide a uniform and orderly process for meeting NASA's programmatic and institutional real estate needs and other real estate management requirements. The purpose of this Real Estate Management Program Implementation Handbook (REMPIH) is to provide guidance and assistance to NASA officials in carrying out their responsibilities for the review, reporting, accounting, acquisition, and disposal of NASA controlled/occupied real estate in accordance with the applicable procedures of 14 CFR 1204.501, 1204.503, 1204.504, and Attachment A to NMI 8800.14. The REMPIH provides a concise, non-technical, and authoritative reference for the efficient management of NASA real estate.

  11. 78 FR 47014 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... 22, 2012 (77 FR 50727) for a 60-day public comment period. The public comment period closed on... COMMISSION Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear... 1 of RG 1.169, ``Configuration Management Plans for Digital Computer Software Used in Safety...

  12. Demand management implementation in Southeast Asia

    SciTech Connect

    Tanaboriboon, Y.

    1995-12-31

    The need to apply transportation system management, to developing countries is urgent. Attempts to alleviate severe traffic congestion in their metropolises have so far failed to provide adequate solutions. The countries are faced with many difficulties because of the lack of sufficient financial resources together with their complex internal administrative and political problems. They are incapable of providing sufficient road space to cope with the escalating demand in private automobiles. This has led to excessive delays in urban traveling, environmental pollution problems, decline of road-based public transit services and deterioration of the quality of life in these metropolises. Demand management, in use for decades in the Western world, has also been recognized in Singapore`s famous area licensing scheme (ALS) making other Southeast Asian Metropolises aware of its advantages as an alternative in solving their chaotic traffic problems. However, realization is far different from implementation and still many metropolises are not able to apply the technique. Singapore and Thailand, two leaders among many other Southeast Asian regions in economics, tourism, trade and industry handle their problems far differently, especially the traffic congestion problem. While a number of demand management schemes have been implemented successfully in Singapore since 1975, Bangkok is still struggling to implement such measures to alleviate severe traffic congestion problems. This article intends to high light the successful practices and unsuccessful attempts of demand management techniques applied in Singapore and Bangkok.

  13. Network configuration management : paving the way to network agility.

    SciTech Connect

    Maestas, Joseph H.

    2007-08-01

    Sandia networks consist of nearly nine hundred routers and switches and nearly one million lines of command code, and each line ideally contributes to the capabilities of the network to convey information from one location to another. Sandia's Cyber Infrastructure Development and Deployment organizations recognize that it is therefore essential to standardize network configurations and enforce conformance to industry best business practices and documented internal configuration standards to provide a network that is agile, adaptable, and highly available. This is especially important in times of constrained budgets as members of the workforce are called upon to improve efficiency, effectiveness, and customer focus. Best business practices recommend using the standardized configurations in the enforcement process so that when root cause analysis results in recommended configuration changes, subsequent configuration auditing will improve compliance to the standard. Ultimately, this minimizes mean time to repair, maintains the network security posture, improves network availability, and enables efficient transition to new technologies. Network standardization brings improved network agility, which in turn enables enterprise agility, because the network touches all facets of corporate business. Improved network agility improves the business enterprise as a whole.

  14. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    SciTech Connect

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

  15. Synthesizing Configurable Biochemical Implementation of Linear Systems from Their Transfer Function Specifications

    PubMed Central

    Chiu, Tai-Yin; Chiang, Hui-Ju K.; Huang, Ruei-Yang; Jiang, Jie-Hong R.; Fages, François

    2015-01-01

    The ability to engineer synthetic systems in the biochemical context is constantly being improved and has a profound societal impact. Linear system design is one of the most pervasive methods applied in control tasks, and its biochemical realization has been proposed by Oishi and Klavins and advanced further in recent years. However, several technical issues remain unsolved. Specifically, the design process is not fully automated from specification at the transfer function level, systems once designed often lack dynamic adaptivity to environmental changes, matching rate constants of reactions is not always possible, and implementation may be approximative and greatly deviate from the specifications. Building upon the work of Oishi and Klavins, this paper overcomes these issues by introducing a design flow that transforms a transfer-function specification of a linear system into a set of chemical reactions, whose input-output response precisely conforms to the specification. This system is implementable using the DNA strand displacement technique. The underlying configurability is embedded into primitive components and template modules, and thus the entire system is adaptive. Simulation of DNA strand displacement implementation confirmed the feasibility and superiority of the proposed synthesis flow. PMID:26352855

  16. Synthesizing Configurable Biochemical Implementation of Linear Systems from Their Transfer Function Specifications.

    PubMed

    Chiu, Tai-Yin; Chiang, Hui-Ju K; Huang, Ruei-Yang; Jiang, Jie-Hong R; Fages, François

    2015-01-01

    The ability to engineer synthetic systems in the biochemical context is constantly being improved and has a profound societal impact. Linear system design is one of the most pervasive methods applied in control tasks, and its biochemical realization has been proposed by Oishi and Klavins and advanced further in recent years. However, several technical issues remain unsolved. Specifically, the design process is not fully automated from specification at the transfer function level, systems once designed often lack dynamic adaptivity to environmental changes, matching rate constants of reactions is not always possible, and implementation may be approximative and greatly deviate from the specifications. Building upon the work of Oishi and Klavins, this paper overcomes these issues by introducing a design flow that transforms a transfer-function specification of a linear system into a set of chemical reactions, whose input-output response precisely conforms to the specification. This system is implementable using the DNA strand displacement technique. The underlying configurability is embedded into primitive components and template modules, and thus the entire system is adaptive. Simulation of DNA strand displacement implementation confirmed the feasibility and superiority of the proposed synthesis flow. PMID:26352855

  17. Managing configuration software of ground software applications with glueware

    NASA Technical Reports Server (NTRS)

    Larsen, B.; Herrera, R.; Sesplaukis, T.; Cheng, L.; Sarrel, M.

    2003-01-01

    This paper reports on a simple, low-cost effort to streamline the configuration of the uplink software tools. Even though the existing ground system consisted of JPL and custom Cassini software rather than COTS, we chose a glueware approach--reintegrating with wrappers and bridges and adding minimal new functionality.

  18. Configuration management manual as a tool for improving plant change controls

    SciTech Connect

    Craig, L.L. )

    1991-01-01

    Early vintage plants, such as Turkey Point at Florida Power and Light (FP and L) Company, were not provided with as much design documentation as later plants. At FP and L, programs were initiated to reconstruct the design bases, correct and update drawings at Turkey Point, and develop an overall configuration management program for both Turkey Point and St. Lucie plants. This paper discusses the Configuration Management Manual developed by plant and engineering personnel, which is used to train personnel to a common language and achieve better understanding of individual impact on configuration management.

  19. FPGA implementation of a configurable neuromorphic CPG-based locomotion controller.

    PubMed

    Barron-Zambrano, Jose Hugo; Torres-Huitzil, Cesar

    2013-09-01

    Neuromorphic engineering is a discipline devoted to the design and development of computational hardware that mimics the characteristics and capabilities of neuro-biological systems. In recent years, neuromorphic hardware systems have been implemented using a hybrid approach incorporating digital hardware so as to provide flexibility and scalability at the cost of power efficiency and some biological realism. This paper proposes an FPGA-based neuromorphic-like embedded system on a chip to generate locomotion patterns of periodic rhythmic movements inspired by Central Pattern Generators (CPGs). The proposed implementation follows a top-down approach where modularity and hierarchy are two desirable features. The locomotion controller is based on CPG models to produce rhythmic locomotion patterns or gaits for legged robots such as quadrupeds and hexapods. The architecture is configurable and scalable for robots with either different morphologies or different degrees of freedom (DOFs). Experiments performed on a real robot are presented and discussed. The obtained results demonstrate that the CPG-based controller provides the necessary flexibility to generate different rhythmic patterns at run-time suitable for adaptable locomotion. PMID:23631905

  20. Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers

    SciTech Connect

    DALE, R.N.

    2000-05-01

    Long Length Contaminated Equipment Removal System Receiver Trailer and Transport Trailer require a configuration management plan for design, requirements and operations baseline documents. This report serves as the plan for the Trailers.

  1. Current Practices in Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB)

    NASA Technical Reports Server (NTRS)

    Lohr, Gary W.; Williams, Daniel M.

    2008-01-01

    Significant air traffic increases are anticipated for the future of the National Airspace System (NAS). To cope with future traffic increases, fundamental changes are required in many aspects of the air traffic management process including the planning and use of NAS resources. Two critical elements of this process are the selection of airport runway configurations, and the effective management of active runways. Two specific research areas in NASA's Airspace Systems Program (ASP) have been identified to address efficient runway management: Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB). This report documents efforts in assessing past as well as current work in these two areas.

  2. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

  3. Implementation of remote monitoring and managing switches

    NASA Astrophysics Data System (ADS)

    Leng, Junmin; Fu, Guo

    2010-12-01

    In order to strengthen the safety performance of the network and provide the big convenience and efficiency for the operator and the manager, the system of remote monitoring and managing switches has been designed and achieved using the advanced network technology and present network resources. The fast speed Internet Protocol Cameras (FS IP Camera) is selected, which has 32-bit RSIC embedded processor and can support a number of protocols. An Optimal image compress algorithm Motion-JPEG is adopted so that high resolution images can be transmitted by narrow network bandwidth. The architecture of the whole monitoring and managing system is designed and implemented according to the current infrastructure of the network and switches. The control and administrative software is projected. The dynamical webpage Java Server Pages (JSP) development platform is utilized in the system. SQL (Structured Query Language) Server database is applied to save and access images information, network messages and users' data. The reliability and security of the system is further strengthened by the access control. The software in the system is made to be cross-platform so that multiple operating systems (UNIX, Linux and Windows operating systems) are supported. The application of the system can greatly reduce manpower cost, and can quickly find and solve problems.

  4. Operational concepts for the Environmental Restoration and Waste Management Configuration Study

    SciTech Connect

    1990-12-01

    DOE has initiated a planning process in anticipation of upgrading all DOE waste management operations and facilities. The EM Configuration Study examines four areas: (1) planning considerations, (2) system configuration, (3) operational concepts, and (4) resource assessments. Each area is addressed by a different team. Objective of the Operational Concepts Team 3 study is to investigate, identify, define, and evaluate alternative ways to manage DOE waste management facilities, while taking into consideration the information gathered by the other EM Configuration teams. This report provides information and criteria for evaluating the relative effectiveness and efficiency of various organizational alternatives that can be used to operate and manage DOE waste facilities. Intent of this report is not to select one best management alternative but rather to provide recommendations, conclusions, and background information from which decisions will be made at a future date.

  5. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.

  6. Saltwell Leak Detector Station Programmable Logic Controller (PLC) Software Configuration Management Plan (SCMP)

    SciTech Connect

    WHITE, K.A.

    2000-11-28

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell Leak Detector Stations as required by HNF-PRO-309, Rev. 1, Computer Software Quality Assurance, Section 2.4, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell Leak Detector Station Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell Leak Detector Station PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis.

  7. Saltwell PIC Skid Programmable Logic Controller (PLC) Software Configuration Management Plan

    SciTech Connect

    KOCH, M.R.

    1999-11-16

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell PIC Skids as required by LMH-PRO-309, Rev. 0, Computer Software Quality Assurance, Section 2.6, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell PIC Skid Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell PIC Skid PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis.

  8. Implementing Successful Enrollment Management: A Conceptual Framework and Two Examples.

    ERIC Educational Resources Information Center

    Clagett, Craig A.

    Successful enrollment management depends on an information base that is comprehensive, targeted, and continuously updated to inform enrollment management policies and monitor their effectiveness. Institutions implementing enrollment management programs need to establish an initial information infrastructure, including a longitudinal student…

  9. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    NASA Technical Reports Server (NTRS)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  10. Implementing CORAL: An Electronic Resource Management System

    ERIC Educational Resources Information Center

    Whitfield, Sharon

    2011-01-01

    A 2010 electronic resource management survey conducted by Maria Collins of North Carolina State University and Jill E. Grogg of University of Alabama Libraries found that the top six electronic resources management priorities included workflow management, communications management, license management, statistics management, administrative…

  11. Implementation of Total Asset Management at the University of Tasmania.

    ERIC Educational Resources Information Center

    Smith, Matt

    2002-01-01

    Describes the implementation of total asset management (TAM) at the University of Tasmania to better link physical resources management with the university's strategic planning. Discusses TAM's principles, objectives, and future direction. (EV)

  12. Benefit Assessment for Metroplex Tactical Runway Configuration Management (mTRCM) in a Simulated Environment

    NASA Technical Reports Server (NTRS)

    Phojanamongkolkij, Nipa; Oseguera-Lohr, Rosa M.; Lohr, Gary W.; Robbins, Steven W.; Fenbert, James W.; Hartman, Christopher L.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept is a collection of capabilities focused on a more efficient use of runways while considering all of the factors that affect runway use. Tactical Runway Configuration Management (TRCM), one of the SORM capabilities, provides runway configuration and runway usage recommendations, and monitoring the active runway configuration for suitability given existing factors. This report focuses on the metroplex environment, with two or more proximate airports having arrival and departure operations that are highly interdependent. The myriad of factors that affect metroplex opeations require consideration in arriving at runway configurations that collectively best serve the system as a whole. To assess the metroplex TRCM (mTRCM) benefit, the performance metrics must be compared with the actual historical operations. The historical configuration schedules can be viewed as the schedules produced by subject matter experts (SMEs), and therefore are referred to as the SMEs' schedules. These schedules were obtained from the FAA's Aviation System Performance Metrics (ASPM) database; this is the most representative information regarding runway configuration selection by SMEs. This report focused on a benefit assessment of total delay, transit time, and throughput efficiency (TE) benefits using the mTRCM algorithm at representative volumes for today's traffic at the New York metroplex (N90).

  13. Oak Ridge National Laboratory's (ORNL) Weigh-In-Motion (WIM) Configuration and Data Management Activities

    SciTech Connect

    Abercrombie, Robert K; Sheldon, Frederick T; Schlicher, Bob G

    2006-01-01

    The Oak Ridge National Laboratory (ORNL) involvement in the Weigh-in-Motion (WIM) research with both government agencies and private companies dates back to 1989. The discussion here will focus on the US Army's current need for an automated WIM system to weigh and determine the center-of-balance for military wheeled vehicles and cargo and the expanded uses of WIM data. ORNL is addressing configuration and data management issues as they relate to deployments for both military and humanitarian activities. The transition from the previous WIM Gen I to the current Gen II system illustrates a configuration and data management solution that ensures data integration, integrity, coherence and cost effectiveness. Currently, Army units use portable and fixed scales, tape measures, and calculators to determine vehicle axle, total weights and center of balance for vehicles prior to being transshipped via railcar, ship, or airlifted. Manually weighing and measuring all vehicles subject to these transshipment operations is time-consuming, labor-intensive, hazardous and is prone to human errors (e.g., misreading scales and tape measures, calculating centers of balance and wheel, axle, and vehicle weights, recording data, and transferring data from manually prepared work sheets into an electronic data base and aggravated by adverse weather conditions). Additionally, in the context of the military, the timeliness, safety, success, and effectiveness of airborne heavy-drop operations can be significantly improved by the use of an automated system to weigh and determine center of balance of vehicles while they are in motion. The lack of a standardized airlift-weighing system for joint service use also creates redundant weighing requirements at the cost of scarce resources and time. This case study can be judiciously expanded into commercial operations related to safety and enforcement. The WIM program will provide a means for the Army to automatically identify/weigh and monitor

  14. PTC MathCAD and Workgroup Manager: Implementation in a Multi-Org System

    NASA Technical Reports Server (NTRS)

    Jones, Corey

    2015-01-01

    In this presentation, the presenter will review what was done at Kennedy Space Center to deploy and implement PTC MathCAD and PTC Workgroup Manager in a multi-org system. During the presentation the presenter will explain how they configured PTC Windchill to create custom soft-types and object initialization rules for their custom numbering scheme and why they choose these methods. This presentation will also include how to modify the EPM default soft-type file in the PTC Windchill server codebase folder. The presenter will also go over the code used in a start up script to initiate PTC MathCAD and PTC Workgroup Manager in the proper order, and also set up the environment variables when running both PTC Workgroup Manager and PTC Creo. The configuration.ini file the presenter used will also be reviewed to show you how to set up the PTC Workgroup Manager and customized it to their user community. This presentation will be of interest to administrators trying to create a similar set-up in either a single org or multiple org system deployment. The big take away will be ideas and best practices learned through implementing this system, and the lessons learned what to do and not to do when setting up this configuration. Attendees will be exposed to several different sets of code used and that worked well and will hear some limitations on what the software can accomplish when configured this way.

  15. 77 FR 50727 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ...The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1206, ``Configuration Management Plan for Digital Computer Software Used in Safety Systems of Nuclear Power Plants.'' The DG-1206 is proposed Revision 1 of RG 1.169, dated September 1997. This revision endorses, with clarifications, the enhanced consensus practices for......

  16. Implementing Total Quality Management in a University Setting.

    ERIC Educational Resources Information Center

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  17. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  18. Development and implementation of configurational forces based constitutive phase field models for shape memory alloys

    NASA Astrophysics Data System (ADS)

    Agboola, Babatunde Omogbolahan

    Continuum thermodynamic constitutive phase field models are developed to simulate the rate dependent, thermomechanical response and precipitate formation in shape memory alloys (SMAs). The two models are based on the application of the balance of configurational forces, a scalar order parameter (a phase field) and atomic concentration to extend standard continuum thermodynamics approach. Constitutive field equations that capture the kinetics of solid-solid martensitic phase transition in SMA and the diffusion mediated precipitate formation in an elastic solid are developed. The coupled set of thermodynamically consistent field equations results from balance of configuration forces, balance of linear momentum, balance of energy and balance of atomic species mass. The field equations capture the kinetics of phase transition, deformation and elastic wave, heat transfer and atomic diffusion respectively. The first model is thermomechanical and is used to simulate the macroscopic response of SMA such as pseudoelasticity; transformation induced pseudo-creep, stress relaxation as well as the effect of cooling rate on mechanical and thermally induced phase transformation of SMA. The second model couples diffusion with elasticity to simulate growth and coarsening of precipitate and experimentally observed concentration depletion near the precipitates Results of the simulations of the macroscopic SMA response are in very good agreement with experimental observation. Simulations suggest that rate dependent and complex thermomechanical response of SMA are due to the interaction of an inherent time scale ( as well as length scale) of phase transformation, introduced through the balance of configurational forces, with other time scales. This work contributes to improved SMA modeling, scientific understanding and design. In particular, for aerospace application under stringent requirement and severe environmental conditions. Contribution of fundamental use of balance of

  19. Implementation of Integrated System Fault Management Capability

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John; Morris, Jon; Smith, Harvey; Turowski, Mark

    2008-01-01

    Fault Management to support rocket engine test mission with highly reliable and accurate measurements; while improving availability and lifecycle costs. CORE ELEMENTS: Architecture, taxonomy, and ontology (ATO) for DIaK management. Intelligent Sensor Processes; Intelligent Element Processes; Intelligent Controllers; Intelligent Subsystem Processes; Intelligent System Processes; Intelligent Component Processes.

  20. A Strategy for Implementing the School Management Team.

    ERIC Educational Resources Information Center

    Ohio School Boards Association, Columbus.

    To aid school administrators, this guidebook presents information on planning, implementing, and evaluating a school management team approach. The first section reviews the definition and philosophy of the management team, discusses propositions about and characteristics of management teams, and describes the application of team decision-making to…

  1. Barriers to Implementation of Case Management for Patients With Dementia: A Systematic Mixed Studies Review

    PubMed Central

    Khanassov, Vladimir; Vedel, Isabelle; Pluye, Pierre

    2014-01-01

    PURPOSE Results of case management designed for patients with dementia and their caregivers in community-based primary health care (CBPHC) were inconsistent. Our objective was to identify the relationships between key outcomes of case management and barriers to implementation. METHODS We conducted a systematic mixed studies review (including quantitative and qualitative studies). Literature search was performed in MEDLINE, PsycINFO, Embase, and Cochrane Library (1995 up to August 2012). Case management intervention studies were used to assess clinical outcomes for patients, service use, caregiver outcomes, satisfaction, and cost-effectiveness. Qualitative studies were used to examine barriers to case management implementation. Patterns in the relationships between barriers to implementation and outcomes were identified using the configurational comparative method. The quality of studies was assessed using the Mixed Methods Appraisal Tool. RESULTS Forty-three studies were selected (31 quantitative and 12 qualitative). Case management had a limited positive effect on behavioral symptoms of dementia and length of hospital stay for patients and on burden and depression for informal caregivers. Interventions that addressed a greater number of barriers to implementation resulted in increased number of positive outcomes. Results suggested that high-intensity case management was necessary and sufficient to produce positive clinical outcomes for patients and to optimize service use. Effective communication within the CBPHC team was necessary and sufficient for positive outcomes for caregivers. CONCLUSIONS Clinicians and managers who implement case management in CBPHC should take into account high-intensity case management (small caseload, regular proactive patient follow-up, regular contact between case managers and family physicians) and effective communication between case managers and other CBPHC professionals and services. PMID:25354410

  2. Multimedia case management system implemented in Java

    NASA Astrophysics Data System (ADS)

    Stewart, Howard D.; Davis, Midge L.; Handy, Dale L.; Kvarfordt, Kent B.; Ford, Glenn

    1999-01-01

    Managing the timely access of information is a major challenge facing law enforcement agencies. One of the areas of greatest need is that of the case management process. During the course of FY98, the Office of National Drug Control Policy (ONDCP), the Counterdrug Technology Assessment Center (CTAC), the Idaho National Engineering and Environmental Laboratory (INEEL), and the Criminal Investigative Bureau (CIB) of the state of Idaho, created a Northwest testbed to develop and integrate a multimedia case management system. A system was developed to assist investigators in tracking and maintaining investigative cases and improving access to internal and external data resources. In this paper, we discuss the results of our case management system development and the ability to present state and federal information incorporating object oriented and multimedia techniques. We then outline our plans for future research and development.

  3. Software Configuration Management for Safety-Related Applications in Space Systems: Extending the Application of the USAF 8-Step Method

    NASA Astrophysics Data System (ADS)

    Johnson, C. W.

    2010-09-01

    Configuration management ensures that the requirements and constraints, identified in previous stages of development, are preserved throughout the design, implementation and operation of complex systems. Space-related, software systems pose particular problems because, for instance, it can be hard to determine what code is actually running on a platform as successive updates are performed over many months of remote operation. It is, therefore, important we learn as much as possible from previous mishaps that have involved configuration management; given that software continues to play a critical role in the safety of many space missions. The following pages extend the US Air Force’s 8-Step Method to identify lessons learned from space related incidents. This approach builds on Boyd’s OODA(Observe, Orient, Decide and Act) Loop and provides a common framework for the analysis of these complex incidents. It is important to stress that the application of an existing general approach to problem solving, rather than the development of a specific approach for configuration management, is intended to reduce training costs and to increase the value added from existing investments in the use of the 8-Step Method. Many specialised software engineering techniques are not used because they cannot easily be applied within the financial limits and deadlines that constrain most space programmes. The closing sections of this paper identify areas for further work; in particular, we stress the importance of links with recent European Space Agency problem solving techniques that support the early-stage development of long duration space missions.

  4. Configuration Control of a Mobile Dextrous Robot: Real-Time Implementation and Experimentation

    NASA Technical Reports Server (NTRS)

    Lim, David; Seraji, Homayoun

    1996-01-01

    This paper describes the design and implementation of a real-time control system with multiple modes of operation for a mobile dexterous manipulator. The manipulator under study is a kinematically redundant seven degree-of-freedom arm from Robotics Research Corporation, mounted on a one degree-of-freedom motorized platform.

  5. Managing Hardware Configurations and Data Products for the Canadian Hydrogen Intensity Mapping Experiment

    NASA Astrophysics Data System (ADS)

    Hincks, A. D.; Shaw, J. R.; Chime Collaboration

    2015-09-01

    The Canadian Hydrogen Intensity Mapping Experiment (CHIME) is an ambitious new radio telescope project for measuring cosmic expansion and investigating dark energy. Keeping good records of both physical configuration of its 1280 antennas and their analogue signal chains as well as the ˜100 TB of data produced daily from its correlator will be essential to the success of CHIME. In these proceedings we describe the database-driven software we have developed to manage this complexity.

  6. Computer software configuration management plan for 200 East/West Liquid Effluent Facilities

    SciTech Connect

    Graf, F.A. Jr.

    1995-02-27

    This computer software management configuration plan covers the control of the software for the monitor and control system that operates the Effluent Treatment Facility and its associated truck load in station and some key aspects of the Liquid Effluent Retention Facility that stores condensate to be processed. Also controlled is the Treated Effluent Disposal System`s pumping stations and monitors waste generator flows in this system as well as the Phase Two Effluent Collection System.

  7. Development of an integrated configuration management/flight director system for piloted STOL approaches

    NASA Technical Reports Server (NTRS)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1977-01-01

    A system analysis method for the development of an integrated configuration management/flight director system for IFR STOL approaches is presented. Curved descending decelerating approach trajectories are considered. Considerable emphasis is placed on satisfying the pilot centered requirements (acceptable workload) as well as the usual guidance and control requirements (acceptable performance). The Augmentor Wing Jet STOL Research Aircraft was utilized to allow illustration by example, and to validate the analysis procedure via manned simulation.

  8. Design of a flight director/configuration management system for piloted STOL approaches

    NASA Technical Reports Server (NTRS)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1973-01-01

    The design and characteristics of a flight director for V/STOL aircraft are discussed. A configuration management system for piloted STOL approaches is described. The individual components of the overall system designed to reduce pilot workload to an acceptable level during curved, decelerating, and descending STOL approaches are defined. The application of the system to augmentor wing aircraft is analyzed. System performance checks and piloted evaluations were conducted on a flight simulator and the results are summarized.

  9. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    NASA Technical Reports Server (NTRS)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  10. IMPLEMENTING SCIENTIFIC SIMULATION CODES HIGHLY TAILORED FOR VECTOR ARCHITECTURES USING CUSTOM CONFIGURABLE COMPUTING MACHINES

    NASA Technical Reports Server (NTRS)

    Rutishauser, David K.

    2006-01-01

    The motivation for this work comes from an observation that amidst the push for Massively Parallel (MP) solutions to high-end computing problems such as numerical physical simulations, large amounts of legacy code exist that are highly optimized for vector supercomputers. Because re-hosting legacy code often requires a complete re-write of the original code, which can be a very long and expensive effort, this work examines the potential to exploit reconfigurable computing machines in place of a vector supercomputer to implement an essentially unmodified legacy source code. Custom and reconfigurable computing resources could be used to emulate an original application's target platform to the extent required to achieve high performance. To arrive at an architecture that delivers the desired performance subject to limited resources involves solving a multi-variable optimization problem with constraints. Prior research in the area of reconfigurable computing has demonstrated that designing an optimum hardware implementation of a given application under hardware resource constraints is an NP-complete problem. The premise of the approach is that the general issue of applying reconfigurable computing resources to the implementation of an application, maximizing the performance of the computation subject to physical resource constraints, can be made a tractable problem by assuming a computational paradigm, such as vector processing. This research contributes a formulation of the problem and a methodology to design a reconfigurable vector processing implementation of a given application that satisfies a performance metric. A generic, parametric, architectural framework for vector processing implemented in reconfigurable logic is developed as a target for a scheduling/mapping algorithm that maps an input computation to a given instance of the architecture. This algorithm is integrated with an optimization framework to arrive at a specification of the architecture parameters

  11. Configuration Management (CM) Support for KM Processes at NASA/Johnson Space Center (JSC)

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis

    2010-01-01

    Collection and processing of information are critical aspects of every business activity from raw data to information to an executable decision. Configuration Management (CM) supports KM practices through its automated business practices and its integrated operations within the organization. This presentation delivers an overview of JSC/Space Life Sciences Directorate (SLSD) and its methods to encourage innovation through collaboration and participation. Specifically, this presentation will illustrate how SLSD CM creates an embedded KM activity with an established IT platform to control and update baselines, requirements, documents, schedules, budgets, while tracking changes essentially managing critical knowledge elements.

  12. The XML approach to implementing space link extension service management

    NASA Technical Reports Server (NTRS)

    Tai, W.; Welz, G. A.; Theis, G.; Yamada, T.

    2001-01-01

    A feasibility study has been conducted at JPL, ESOC, and ISAS to assess the possible applications of the eXtensible Mark-up Language (XML) capabilities to the implementation of the CCSDS Space Link Extension (SLE) Service Management function.

  13. Implementing EBIPM: science-driven plant management

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Land managers often fail to recognize that when invasive species begin to establish, the weeds themselves are not the actual cause of the problem but a symptom of ecological processes not functioning properly on the landscape. These ecological processes in disrepair are what drive a plant community ...

  14. Implementation of SAP Waste Management System

    SciTech Connect

    Frost, M.L.; LaBorde, C.M.; Nichols, C.D.

    2008-07-01

    The Y-12 National Security Complex (Y-12) assumed responsibility for newly generated waste on October 1, 2005. To ensure effective management and accountability of newly generated waste, Y-12 has opted to utilize SAP, Y-12's Enterprise Resource Planning (ERP) tool, to track low-level radioactive waste (LLW), mixed waste (MW), hazardous waste, and non-regulated waste from generation through acceptance and disposal. SAP Waste will include the functionality of the current waste tracking system and integrate with the applicable modules of SAP already in use. The functionality of two legacy systems, the Generator Entry System (GES) and the Waste Information Tracking System (WITS), and peripheral spreadsheets, databases, and e-mail/fax communications will be replaced by SAP Waste. Fundamentally, SAP Waste will promote waste acceptance for certification and disposal, not storage. SAP Waste will provide a one-time data entry location where waste generators can enter waste container information, track the status of their waste, and maintain documentation. A benefit of the new system is that it will provide a single data repository where Y-12's Waste Management organization can establish waste profiles, verify and validate data, maintain inventory control utilizing hand-held data transfer devices, schedule and ship waste, manage project accounting, and report on waste handling activities. This single data repository will facilitate the production of detailed waste generation reports for use in forecasting and budgeting, provide the data for required regulatory reports, and generate metrics to evaluate the performance of the Waste Management organization and its subcontractors. SAP Waste will replace the outdated and expensive legacy system, establish tools the site needs to manage newly generated waste, and optimize the use of the site's ERP tool for integration with related business processes while promoting disposition of waste. (authors)

  15. Implementing Management Systems-Based Assessments

    SciTech Connect

    Campisi, John A.; Reese, Robert T.

    1999-05-03

    A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'~arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES&H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in centralized

  16. Green Revolving Funds: An Introductory Guide to Implementation & Management

    ERIC Educational Resources Information Center

    Indvik, Joe; Foley, Rob; Orlowski, Mark

    2013-01-01

    The goal of this introductory implementation guide is to provide practical guidance for designing, implementing, and managing a green revolving fund (GRF) at a college, university, or other institution. The GRF model is widespread in higher education, with at least 79 funds in operation in North America representing over $111 million in committed…

  17. Implementing Student Peer Review: Opportunity versus Change Management

    ERIC Educational Resources Information Center

    Pharo, Emma; De Salas, Kristy

    2009-01-01

    This paper reflects on the implementation of a peer-assessment innovation in a large first-year geography unit. While the innovation had been carefully researched, difficulties in the implementation drew the authors' attention to the need for more change management to be built into the design and development. Focusing specifically on the teacher…

  18. Career Oriented Education Management/Implementation Model. Model Description Package.

    ERIC Educational Resources Information Center

    Education Service Center Region 17, Lubbock, TX.

    The model described here is designed to serve as a method whereby a local school management/implementation team can implement career oriented education. It provides infusion strategies, materials, and staff development techniques through which The Education Service Center (ESC) staff trains and supports the Local Education Agency (LEA) team, which…

  19. Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) Project A.9

    SciTech Connect

    GREEN, J.W.

    2000-05-01

    This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment.

  20. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital

    PubMed Central

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiyasvand, Hesam

    2016-01-01

    Background: A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders’ satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. Objectives: We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. Materials and Methods: This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. Results: According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Conclusions: Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be

  1. Provenance management in Swift with implementation details.

    SciTech Connect

    Gadelha, L. M. R; Clifford, B.; Mattoso, M.; Wilde, M.; Foster, I.

    2011-04-01

    The Swift parallel scripting language allows for the specification, execution and analysis of large-scale computations in parallel and distributed environments. It incorporates a data model for recording and querying provenance information. In this article we describe these capabilities and evaluate interoperability with other systems through the use of the Open Provenance Model. We describe Swift's provenance data model and compare it to the Open Provenance Model. We also describe and evaluate activities performed within the Third Provenance Challenge, which consisted of implementing a specific scientific workflow, capturing and recording provenance information of its execution, performing provenance queries, and exchanging provenance information with other systems. Finally, we propose improvements to both the Open Provenance Model and Swift's provenance system.

  2. Factors that influence producer decisions to implement management strategies.

    PubMed

    Field, Thomas G

    2014-12-01

    Cow-calf enterprises in the USA are widely divergent in size, locale, resource availability, management skill, and market focus. Furthermore, variation exists in dependence on the cow-calf enterprise as a primary source of income, perception about the utility of a particular management practice or technology, and assessment of cost: benefit resulting from implementation impact decisions. Enterprises with larger cow inventories, greater dependence on income from the cattle enterprise, and that retain ownership further into the supply chain beyond the cow-calf operation are more likely to institute management protocols such as vaccination programs, defined calving seasons, and reproductive technologies. Successful cow-calf managers place the highest priority on herd nutrition, pasture and range management, herd health, financial management marketing, production management, and genetics. Management practices are more likely to be adopted when they align with a manager's perception of the utility, labor availability, favorable cost: benefit outcomes and profit motivation. PMID:25497503

  3. Xcel Energy implements an alarm management strategy

    SciTech Connect

    Bass, J.; Abreu, G.

    2007-11-15

    Not so long ago, Xcel Energy's Pawnee Station, a 505 MW coal-fired generating station in Brush, Colorado, USA was commonly generating 300 to 400 alarms per 8-hour shift. The article describes how the alarm system was revised and improved by tackling alarm dead-bands, and rationalising alarms for routine events. Operators are trained to understand the functions of alarm management components, their use and response, and obtain feedback. Today the power station reports about one alarm per hour. 3 photos.

  4. Evaluating the implementation of a pain management flow sheet.

    PubMed

    Joyce, B A; Keck, J F; Gerkensmeyer, J E

    1999-10-01

    This study evaluated the outcome of implementing a pain flow sheet, using protocols derived from the Agency for Health Care Policy and Research (AHCPR) guidelines for pain management, for children recovering from surgery. Findings indicated the flow sheet was not used as designed; thus, implementing the flow sheet did not result in increased documentation of pain assessments, interventions, and outcomes, except in the increased documentation of nonpharmacological interventions for pain management. Rogers' Diffusion of Innovation Theory gives insight as to why this occurred and provides rationale for more intensive in-service education when new innovations are implemented. PMID:10554443

  5. e-VLBI Access Point (eAXP) - a centralized control and EGAE configuration / management application

    NASA Astrophysics Data System (ADS)

    Ruszczyk, Chester Whitney, Alan

    Setting up experiments to utilize Experiment Guided Adaptive Endpoint (EGAE) and e-VLBI is presently a complex and time intensive process requiring scientific, Mark5 and networking knowledge. There is no central access to point to configure and manage all of these aspects of an experiment. The e-VLBI Access Point (eAXP) is a centralized control plane management tool that offers a GUI interface to augment the command line interface presently being used to set up and conduct experiments. eAXP contains three major toolsets: one to set up and execute an experiment using real-time or non-real time modes; the second to configure and manage EGAE; and a third to view statistics of the experiments. Initially the overall system architecture for eAXP is presented, followed by details of the Experiment Profiler toolset including screen shots of the system presently being tested. This will be followed by how eAXP will support real-time modes interfacing to the Dynamic Resource Allocation over GMPLS Optical Network (DRAGON) resource management project.

  6. Configuration management and monitoring of the middleware at GridKa

    NASA Astrophysics Data System (ADS)

    Nilsen, Dimitri; Weber, Pavel

    2012-12-01

    GridKa is a computing centre located in Karlsruhe. It serves as Tier-1 centre for the four LHC experiments and also provides its computing and storage resources for other non-LHC HEP and astroparticle physics experiments as well as for several communities of the German Grid Initiative D-Grid. The middleware layer at GridKa comprises three main flavours: Globus, gLite and UNICORE. This layer provides the access to the several clusters, according to the requirements of the corresponding communities. The heterogeneous structure of middleware resources and services requires their effective administration for stable and sustainable operation of the whole computing centre. In the presentation the overview of the middleware system at GridKa is given with focus on the configuration management and monitoring. These are the crucial components of the administration task for the system with high-availability setup. The various configuration tools used at GridKa, their benefits and limitations as well as developed automation procedures of the configuration management will be discussed. The overview of the monitoring system which evaluates the information delivered by central and local grid information services and provides status and detailed diagnostics for the middleware services is presented.

  7. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    SciTech Connect

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  8. Designing and Implementing Teacher Performance Management Systems: Pitfalls and Possibilities

    ERIC Educational Resources Information Center

    Wiener, Ross; Jacobs, Ariel

    2011-01-01

    As new performance-management-related policies go from idea to implementation, policy makers and education leaders will be called upon to flesh-out what are still broad principles in many areas. This represents a significant inflection point for the teaching profession and the management of public school systems. Early decisions will determine…

  9. Implementing Continuous Improvement Management (CIM) in the Public Schools.

    ERIC Educational Resources Information Center

    Borgers, William E.; Thompson, Tommy A.

    This book traces the restructuring of a Texas school district that moved from management by coercion to continuous improvement for quality. In 1990, the Dickinson Independent School District (Texas) began implementation of Continuous Improvement Management (CIM), based on the teachings of W. Edwards Deming, William Glasser, and J. M. Juran.…

  10. The Implementation of Technology-Based SME Management Development Programmes

    ERIC Educational Resources Information Center

    Carr, James

    2005-01-01

    Learning technology is seen as one solution to the problem of delivering management training in Small and Medium-sized Enterprises (SMEs). This paper investigates how the Higher Education (HE) sector can use its growing expertise in learning technology implementation to develop effective SME management development solutions. It is found that there…

  11. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    SciTech Connect

    Laney, T.

    1994-08-30

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.

  12. Input- and output-oriented approaches to implementing ecosystem management

    NASA Astrophysics Data System (ADS)

    Montgomery, David R.

    1995-03-01

    Input- and output-oriented approaches to landscape management have distinct roles for resource protection, environmental restoration, and sustainable land management. Implementing recent proposals for ecosystem management in the western United States involves a synthesis of input and output management. Within the broader context of ecosystem management, input management focuses on tailoring land use to the landscape, whereas output management employs assessments of resource condition to trigger modified management activity once resources are degraded to specified threshold conditions. Current approaches to landscape-scale management, however, tend to rely primarily on output-oriented strategies that are most effective for monitoring environmental conditions. Current uses of input management focus on environmental impact assessments, which generally are site- or project-specific analyses. The compeexity and dynamic nature of ecosystems, and the range of scales over which ecological processes operate, imply that development and incorporation of input-oriented approaches into landscape-scale management is necessary to implement ecosystem management as a strategy for sustainable land use.

  13. Performance management vital in implementing new strategies

    SciTech Connect

    Kruzner, D.; Trollinger, R.

    1996-11-11

    Wedged between the growing cost of environmental compliance and consumer protests over prices, the downstream oil and gas and petrochemical business segments are having to accelerate the changes that have engulfed their industry. Despite recent price increases, thinning margins have driven energy companies to rethink their role in life and to revaluate and reshape operations and assets in pursuit of new strategies. As companies concentrate on core competencies, shift to demand-pull production, and try to leverage their clout in selected regions for market dominance, performance of key operations has become paramount. In theory, performance management is a simple, straightforward proposition. It means deploying a comprehensive, strategy-linked framework for measuring performance across the entire enterprise and then using the results of these measurements to serve two critical managerial functions. First, performance measurement is the means for making informed, knowledge-based decisions about important business issues such as minimizing operational costs, manufacturing the right mix of products, identifying the most profitable distribution channels, and optimizing the utilization of assets. Second -- and in the long run more importantly -- measuring performance is a means for identifying and addressing areas where a company needs to make the kinds of organizational and process improvements that can develop, sustain, and amplify competitive advantage over the long haul. Experiences at a variety of companies, both within and outside the oil and gas and chemical business segments, demonstrate that progress towards comprehensive performance management is possible, with quantifiable benefits and results. Competitive advantage will be enjoyed by those companies that advance further and faster down this path.

  14. Understanding barriers to implementation of an adaptive land management program.

    PubMed

    Jacobson, Susan K; Morris, Julie K; Sanders, J Scott; Wiley, Eugene N; Brooks, Michael; Bennetts, Robert E; Percival, H Franklin; Marynowski, Susan

    2006-10-01

    The Florida Fish and Wildlife Conservation Commission manages over 650,000 ha, including 26 wildlife management and environmental areas. To improve management, they developed an objective-based vegetation management (OBVM) process that focuses on desired conditions of plant communities through an adaptive management framework. Our goals were to understand potential barriers to implementing OBVM and to recommend strategies to overcome barriers. A literature review identified 47 potential barriers in six categories to implementation of adaptive and ecosystem management: logistical, communication, attitudinal, institutional, conceptual, and educational. We explored these barriers through a bureau-wide survey of 90 staff involved in OBVM and personal interviews with area managers, scientists, and administrators. The survey incorporated an organizational culture assessment instrument to gauge how institutional factors might influence OBVM implementation. The survey response rate was 69%. Logistics and communications were the greatest barriers to implementing OBVM. Respondents perceived that the agency had inadequate resources for implementing OBVM and provided inadequate information. About one-third of the respondents believed OBVM would decrease their job flexibility and perceived greater institutional barriers to the approach. The 43% of respondents who believed they would have more responsibility under OBVM also had greater attitudinal barriers. A similar percentage of respondents reported OBVM would not give enough priority to wildlife. Staff believed that current agency culture was hierarchical but preferred a culture that would provide more flexibility for adaptive management and would foster learning from land management activities. In light of the barriers to OBVM, we recommend the following: (1) mitigation of logistical barriers by addressing real and perceived constraints of staff, funds, and other resources in a participatory manner; (2) mitigation of

  15. Implementing Medicaid managed care: the New York City story.

    PubMed

    Sparer, M; Brown, L D; Kovner, A R

    1999-01-01

    Across the nation, public officials are encouraging or requiring Medicaid beneficiaries to enroll in managed care. In this article, we report on a study of the implementation of Medicaid managed care in New York City. Several findings are clear. First, government officials need to treat health plans as partners rather than adversaries; in New York, the relationship between the state and the plans is far too adversarial. Second, effective managed care requires good management information systems; New York officials are collecting an enormous amount of data but not much useful information. Third, effective implementation of Medicaid managed care is slow going; New York's effort to dramatically accelerate the enrollment process did not work. PMID:10497747

  16. Implementing performance management in the Irish Health Sector.

    PubMed

    Byrne, Michael

    2006-01-01

    To realize the goals of successive health strategies, managers in the Irish Health Sector will have to proactively facilitate optimal employee performance in line with policy objectives. Along with developing employee and teams' capabilities, these managers have begun to implement performance management to achieve the latter. However, there typically are a variety of foundational organizational characteristics required for the successful implementation of performance management. These include providing top-down support for line management buy-in, providing ongoing managerial and performance management training so that trusting relationships and a culture of consensus and cooperation are developed, and appropriately managing expectations. Agreement on employee role definitions and provision of team-based conflict resolution training is also needed to facilitate performance management. There is a need for negotiated performance indicators that are of various types, specific, measurable, and aligned with strategy objectives. Associated reward systems need to be holistic and imaginative, and personal development plans need to have a broader focus than merely improving current job skills and performance. Performance review needs to be ongoing, conducted in a transparent manner, and allocated sufficient discussion time. Managers also need to be mindful of managing overperformance. PMID:16699325

  17. Derivative couplings and analytic gradients for diabatic states, with an implementation for Boys-localized configuration-interaction singles

    NASA Astrophysics Data System (ADS)

    Fatehi, Shervin; Alguire, Ethan; Subotnik, Joseph E.

    2013-09-01

    We demonstrate that Boys-localized diabatic states do indeed exhibit small derivative couplings, as is required of quasidiabatic states. In doing so, we present a general formalism for calculating derivative couplings and analytic gradients for diabatic states. We then develop additional equations specific to the case of Boys-localized configuration-interaction singles (CIS)—in particular, the analytic gradient of the CIS dipole matrix—and we validate our implementation against finite-difference results. In a forthcoming paper, we will publish additional algorithmic and computational details and apply our method to the Closs energy-transfer systems as a further test of the validity of Boys-localized diabatic states.

  18. AZ-101 Mixer Pump Demonstration Data Acquisition System and Gamma Cart Data Acquisition Control System Software Configuration Management Plan

    SciTech Connect

    WHITE, D.A.

    1999-12-29

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS).

  19. Benefits Assessment for Single-Airport Tactical Runway Configuration Management Tool (TRCM)

    NASA Technical Reports Server (NTRS)

    Oseguera-Lohr, Rosa; Phojanamonogkolkij, Nipa; Lohr, Gary W.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept was developed as part of the Airspace Systems Program (ASP) Concepts and Technology Development (CTD) Project, and is composed of two basic capabilities: Runway Configuration Management (RCM), and Combined Arrival/Departure Runway Scheduling (CADRS). RCM is the process of designating active runways, monitoring the active runway configuration for suitability given existing factors, and predicting future configuration changes; CADRS is the process of distributing arrivals and departures across active runways based on local airport and National Airspace System (NAS) goals. The central component in the SORM concept is a tool for taking into account all the various factors and producing a recommendation for what would be the optimal runway configuration, runway use strategy, and aircraft sequence, considering as many of the relevant factors required in making this type of decision, and user preferences, if feasible. Three separate tools were initially envisioned for this research area, corresponding to the time scale in which they would operate: Strategic RCM (SRCM), with a planning horizon on the order of several hours, Tactical RCM (TRCM), with a planning horizon on the order of 90 minutes, and CADRS, with a planning horizon on the order of 15-30 minutes[1]. Algorithm development was initiated in all three of these areas, but the most fully developed to date is the TRCM algorithm. Earlier studies took a high-level approach to benefits, estimating aggregate benefits across most of the major airports in the National Airspace Systems (NAS), for both RCM and CADRS [2]. Other studies estimated the benefit of RCM and CADRS using various methods of re-sequencing arrivals to reduce delays3,4, or better balancing of arrival fixes5,6. Additional studies looked at different methods for performing the optimization involved in selecting the best Runway Configuration Plan (RCP) to use7-10. Most of these previous studies were high

  20. Implementing electronic medication management at an Australian teaching hospital.

    PubMed

    Day, Richard O; Roffe, David J; Richardson, Katrina L; Baysari, Melissa T; Brennan, Nicholas J; Beveridge, Sandy; Melocco, Teresa; Ainge, John; Westbrook, Johanna I

    2011-11-01

    We describe the implementation of an electronic medication management system (eMMS) in an Australian teaching hospital, to inform future similar exercises. The success of eMMS implementation depends on: a positive workplace culture (leadership, teamwork and clinician ownership); acceptance of the major impact on work practices by all staff; timely system response to user feedback; training and support for clinicians; a usable system; adequate decision support. PMID:22060071

  1. Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 2: Data management system configuration

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Earth Observatory Satellite (EOS) data management system (DMS) is discussed. The DMS is composed of several subsystems or system elements which have basic purposes and are connected together so that the DMS can support the EOS program by providing the following: (1) payload data acquisition and recording, (2) data processing and product generation, (3) spacecraft and processing management and control, and (4) data user services. The configuration and purposes of the primary or high-data rate system and the secondary or local user system are explained. Diagrams of the systems are provided to support the systems analysis.

  2. Millennium regional PACS management: strategies for successful implementation

    NASA Astrophysics Data System (ADS)

    Levin, Brad; Romlein, John R.; Gac, Robert J., Jr.; Chacko, Anna K.; Radvany, Martin

    2000-05-01

    With the advent of the new Millennium, Picture Archive and Communications System (PACS) technology has matured to levels sufficient to support open systems based, regional implementations. This shifts the site-centric PACS paradigm into broader scale, impacting facilities, workflow, business plans and ultimately patient care on a regional basis. Prudent and effective management of a regional implementation is critical to overall project success based upon a number of competing influences fundamental to the PACS including network infrastructure, clinical workflow, acquisition modalities, planning documentation, site preparation, acceptance testing, project communication, interface integration issues, etc. Risk mitigation is possible by understanding and managing the interrelationships of these influences through a phased approach with embedded management controls. The overall phases of regional implementation are not unlike site-centric implementations, consisting of Discovery, Planning, Preparation, Installation; Acceptance and Warranty/Maintenance; however, details which manifest over time are what provide significant management challenges. When balanced using a culturally reinforced policy of open, frequent and hands-on communication, regional PACS projects can be successfully implemented maintaining budget, schedule and scope thresholds.

  3. Creating a strategic plan for configuration management using computer aided software engineering (CASE) tools

    SciTech Connect

    Smith, P.R.; Sarfaty, R.

    1993-05-01

    This paper provides guidance in the definition, documentation, measurement, enhancement of processes, and validation of a strategic plan for configuration management (CM). The approach and methodology used in establishing a strategic plan is the same for any enterprise, including the Department of Energy (DOE), commercial nuclear plants, the Department of Defense (DOD), or large industrial complexes. The principles and techniques presented are used world wide by some of the largest corporations. The authors used industry knowledge and the areas of their current employment to illustrate and provide examples. Developing a strategic configuration and information management plan for DOE Idaho Field Office (DOE-ID) facilities is discussed in this paper. A good knowledge of CM principles is the key to successful strategic planning. This paper will describe and define CM elements, and discuss how CM integrates the facility`s physical configuration, design basis, and documentation. The strategic plan does not need the support of a computer aided software engineering (CASE) tool. However, the use of the CASE tool provides a methodology for consistency in approach, graphics, and database capability combined to form an encyclopedia and a method of presentation that is easily understood and aids the process of reengineering. CASE tools have much more capability than those stated above. Some examples are supporting a joint application development group (JAD) to prepare a software functional specification document and, if necessary, provide the capability to automatically generate software application code. This paper briefly discusses characteristics and capabilities of two CASE tools that use different methodologies to generate similar deliverables.

  4. ANALYSIS OF SPECIAL WASTE CONFIGURATIONS AT THE SRS WASTE MANAGEMENT FACILITIES

    SciTech Connect

    Casella, V; Raymond Dewberry, R

    2007-05-14

    Job Control Waste (JCW) at the Savannah River Site (SRS) Solid Waste Management Facilities (SWMF) may be disposed of in special containers, and the analysis of these containers requires developing specific analysis methodologies. A method has been developed for the routine assay of prohibited items (liquids, etc.) contained in a 30-gallon drum that is then placed into a 55-gallon drum. Method development consisted of system calibration with a NIST standard at various drum-to-detector distances, method verification with a liquid sample containing a known amount of Pu-238, and modeling the inner container using Ortec Isotopic software. Using this method for measurement of the known standard in the drum-in-drum configuration produced excellent agreement (within 15%) with the known value. Savannah River Site Solid Waste Management also requested analysis of waste contained in large black boxes (commonly 18-feet x 12-feet x 7-feet) stored at the SWMF. These boxes are frequently stored in high background areas and background radiation must be considered for each analysis. A detection limit of less than 150 fissile-gram-equivalents (FGE) of TRU waste is required for the black-box analyses. There is usually excellent agreement for the measurements at different distances and measurement uncertainties of about 50% are obtained at distances of at least twenty feet from the box. This paper discusses the experimental setup, analysis and data evaluation for drum-in-drum and black box waste configurations at SRS.

  5. Management implementation plan for a safety analysis and review system

    SciTech Connect

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply.

  6. Avoiding the pitfalls of adaptive management implementation in Swedish silviculture.

    PubMed

    Rist, Lucy; Felton, Adam; Mårald, Erland; Samuelsson, Lars; Lundmark, Tomas; Rosvall, Ola

    2016-02-01

    There is a growing demand for alternatives to Sweden's current dominant silvicultural system, driven by a desire to raise biomass production, meet environmental goals and mitigate climate change. However, moving towards diversified forest management that deviates from well established silvicultural practices carries many uncertainties and risks. Adaptive management is often suggested as an effective means of managing in the context of such complexities. Yet there has been scepticism over its appropriateness in cases characterised by large spatial extents, extended temporal scales and complex land ownership-characteristics typical of Swedish forestry. Drawing on published research, including a new paradigm for adaptive management, we indicate how common pitfalls can be avoided during implementation. We indicate the investment, infrastructure, and considerations necessary to benefit from adaptive management. In doing so, we show how this approach could offer a pragmatic operational model for managing the uncertainties, risks and obstacles associated with new silvicultural systems and the challenges facing Swedish forestry. PMID:26744049

  7. The INEL approach: Environmental Restoration Program management and implementation methodology

    SciTech Connect

    1996-02-01

    The overall objectives of the INEL Environmental Restoration (ER) Program management approach are to facilitate meeting mission needs through the successful implementation of a sound, and effective project management philosophy. This paper outlines the steps taken to develop the ER program, and explains further the implementing tools and processes used to achieve what can be viewed as fundamental to a successful program. The various examples provided will demonstrate how the strategies for implementing these operating philosophies are actually present and at work throughout the program, in spite of budget drills and organizational changes within DOE and the implementing contractor. A few of the challenges and successes of the INEL Environmental Restoration Program have included: a) completion of all enforceable milestones to date, b) acceleration of enforceable milestones, c) managing funds to reduce uncosted obligations at year end by utilizing greater than 99% of FY-95 budget, d) an exemplary safety record, e) developing a strategy for partial Delisting of the INEL by the year 2000, f) actively dealing with Natural Resource Damages Assessment issues, g) the achievement of significant project cost reductions, h) and implementation of a partnering charter and application of front end quality principles.

  8. Dryden Flight Research Center Critical Chain Project Management Implementation

    NASA Technical Reports Server (NTRS)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  9. Implementation of School-Based Management in Indonesia. Monograph

    ERIC Educational Resources Information Center

    Vernez, Georges; Karam, Rita; Marshall, Jeffery H.

    2012-01-01

    This study provides a quantitative and qualitative status report on the implementation of school-based management (SBM) in Indonesia, identifies factors associated with the successful practices of SBM, and assesses SBM effects on student achievement eight years after its inception. The authors' findings are based on face-to-face surveys of…

  10. A Necessary Evil: The Experiences of Managers Implementing Downsizing Programmes

    ERIC Educational Resources Information Center

    Noronha, Ernesto; D'Cruz, Premilla

    2006-01-01

    This paper presents the findings of a phenomenological study, which describes the experiences of human resource (HR) managers implementing a downsizing program in a steel manufacturing organization in India. Data were collected through conversational interviews. Following van Manens sententious analytic approach, the core theme of a necessary…

  11. Implementing the Parent Management Training Oregon Model in The Netherlands

    ERIC Educational Resources Information Center

    Bekkema, Nienke; Wiefferink, Carin; Mikolajczak, Jochen

    2008-01-01

    In cooperation with its American developers, the Parent Management Training Oregon (PMTO) model was introduced into the Dutch youth care system at the beginning of 2006. In general, implementing new interventions in practice is no simple matter. Several factors related to the socio-political context, the organizational context, the intervention…

  12. Site-Based Management: The Realities of Implementation.

    ERIC Educational Resources Information Center

    Harrison, Cynthia R.; And Others

    1989-01-01

    In one Colorado school district, site-based management creates ownership for those responsible for implementing decisions by involving them directly in the decision-making process. This article summarizes the district's mistakes and accomplishments in defining terms and roles, providing support and training, resolving conflict, and managing…

  13. Transitions in Classroom Technology: Instructor Implementation of Classroom Management Software

    ERIC Educational Resources Information Center

    Ackerman, David; Chung, Christina; Sun, Jerry Chih-Yuan

    2014-01-01

    The authors look at how business instructor needs are fulfilled by classroom management software (CMS), such as Moodle, and why instructors are sometimes slow to implement it. Instructors at different universities provided both qualitative and quantitative responses regarding their use of CMS. The results indicate that the top needs fulfilled by…

  14. Integrated System Health Management (ISHM) Implementation in Rocket Engine Testing

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Morris, Jon; Turowski, Mark; Franzl, Richard; Walker, Mark; Kapadia, Ravi; Venkatesh, Meera

    2010-01-01

    A pilot operational ISHM capability has been implemented for the E-2 Rocket Engine Test Stand (RETS) and a Chemical Steam Generator (CSG) test article at NASA Stennis Space Center. The implementation currently includes an ISHM computer and a large display in the control room. The paper will address the overall approach, tools, and requirements. It will also address the infrastructure and architecture. Specific anomaly detection algorithms will be discussed regarding leak detection and diagnostics, valve validation, and sensor validation. It will also describe development and use of a Health Assessment Database System (HADS) as a repository for measurements, health, configuration, and knowledge related to a system with ISHM capability. It will conclude with a discussion of user interfaces, and a description of the operation of the ISHM system prior, during, and after testing.

  15. [The implementation of risk management in a department of otolaryngology].

    PubMed

    Teschner, M; Cartes, M I; Lenarz, T

    2011-09-01

    The reasons for introducing risk management in hospitals are manifold. Not only legal but also ethical and moral aspects are of great importance.The implementation of risk management in a German department of otolaryngology is presented. Although various instruments were introduced, the main emphasis was placed on the establishment of a risk management team with the aim of prospectively and retrospectively addressing critical situations in hospital operation management and also with the goal of achieving a change of attitude towards mistakes, complications and damages in the clinic.Many aspects of the in-house processes were critically analyzed and optimization strategies were developed such as the introduction of checklists for preoperative patient identification. Furthermore the implemented CIRS has been well accepted.A meaningful objectivity of the results seems difficult. A main reason is that the index "reduction of damage and medical malpractice" is too small to make a conclusive statistical analysis. However, implementation of risk management is advisable for every ENT clinic. PMID:21773956

  16. Implementation Of Quality Management System For Irradiation Processing Services

    NASA Astrophysics Data System (ADS)

    Lungu, Ion-Bogdan; Manea, Maria-Mihaela

    2015-07-01

    In today's market, due to an increasing competitiveness, quality management has set itself as an indispensable tool and a reference point for every business. It is ultimately focused on customer satisfaction which is a stringent factor for every business. Implementing and maintaining a QMS is a rather difficult, time consuming and expensive process which must be done with respect of many factors. The aim of this paper is to present a case study for implementing QMS ISO 9001 in a gamma irradiation treatment service provider. The research goals are the identification of key benefits, reasons, advantages, disadvantages, drawbacks etc for a successful QMS implementation and use. Finally, the expected results focus on creating a general framework for implementing an efficient QMS plan that can be easily adapted to other kind of services and markets.

  17. Configuring a Graphical User Interface for Managing Local HYSPLIT Model Runs Through AWIPS

    NASA Technical Reports Server (NTRS)

    Wheeler, mark M.; Blottman, Peter F.; Sharp, David W.; Hoeth, Brian; VanSpeybroeck, Kurt M.

    2009-01-01

    Responding to incidents involving the release of harmful airborne pollutants is a continual challenge for Weather Forecast Offices in the National Weather Service. When such incidents occur, current protocol recommends forecaster-initiated requests of NOAA's Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model output through the National Centers of Environmental Prediction to obtain critical dispersion guidance. Individual requests are submitted manually through a secured web site, with desired multiple requests submitted in sequence, for the purpose of obtaining useful trajectory and concentration forecasts associated with the significant release of harmful chemical gases, radiation, wildfire smoke, etc., into local the atmosphere. To help manage the local HYSPLIT for both routine and emergency use, a graphical user interface was designed for operational efficiency. The interface allows forecasters to quickly determine the current HYSPLIT configuration for the list of predefined sites (e.g., fixed sites and floating sites), and to make any necessary adjustments to key parameters such as Input Model. Number of Forecast Hours, etc. When using the interface, forecasters will obtain desired output more confidently and without the danger of corrupting essential configuration files.

  18. Configuration management and software measurement in the Ground Systems Development Environment (GSDE)

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    A set of functional requirements for software configuration management (CM) and metrics reporting for Space Station Freedom ground systems software are described. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the Space Station Training Facility (SSTF) and the Space Station Control Center (SSCC), and the target systems for SSCC and SSTF. The focus is on the CM of the software following delivery to NASA and on the software metrics that relate to the quality and maintainability of the delivered software. The CM and metrics requirements address specific problems that occur in large-scale software development. Mechanisms to assist in the continuing improvement of mission operations software development are described.

  19. Implementation of spatial smart waste management system in malaysia

    NASA Astrophysics Data System (ADS)

    Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Wahap, N. A.; Ismail, N. M.; Ahmad, N.

    2016-06-01

    One of the challenges to innovate and create an IoT -enabled solution is in monitoring and management of the environment. Waste collection utilizing the Internet of Things (IoT) with the technology of smart wireless sensors will able to gather fill-level data from waste containers hence providing a waste monitoring solution that brings up savings in waste collection costs. One of the challenges to the local authority is how to monitor the works of contractor effective and efficiently in waste management. This paper will propose to the local authority the implementation of smart waste management in Malaysia to improve the city management and to provide better services to the public towards smart city applications.

  20. Integrated System Health Management: Pilot Operational Implementation in a Rocket Engine Test Stand

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John L.; Morris, Jonathan A.; Turowski, Mark P.; Franzl, Richard

    2010-01-01

    This paper describes a credible implementation of integrated system health management (ISHM) capability, as a pilot operational system. Important core elements that make possible fielding and evolution of ISHM capability have been validated in a rocket engine test stand, encompassing all phases of operation: stand-by, pre-test, test, and post-test. The core elements include an architecture (hardware/software) for ISHM, gateways for streaming real-time data from the data acquisition system into the ISHM system, automated configuration management employing transducer electronic data sheets (TEDS?s) adhering to the IEEE 1451.4 Standard for Smart Sensors and Actuators, broadcasting and capture of sensor measurements and health information adhering to the IEEE 1451.1 Standard for Smart Sensors and Actuators, user interfaces for management of redlines/bluelines, and establishment of a health assessment database system (HADS) and browser for extensive post-test analysis. The ISHM system was installed in the Test Control Room, where test operators were exposed to the capability. All functionalities of the pilot implementation were validated during testing and in post-test data streaming through the ISHM system. The implementation enabled significant improvements in awareness about the status of the test stand, and events and their causes/consequences. The architecture and software elements embody a systems engineering, knowledge-based approach; in conjunction with object-oriented environments. These qualities are permitting systematic augmentation of the capability and scaling to encompass other subsystems.

  1. Freescale Semiconductor Successfully Implements an Energy Management System

    SciTech Connect

    2011-06-30

    Through the Superior Energy Performance (SEP) plant certification program, Freescale Semiconductor implemented projects at the company's Oak Hill Fab plant that reduced annual energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year. The plant is now certified at the SEP silver level, and has a management system in place to proactively manage the facility's energy resources in the future.

  2. Subsonic Aerodynamic Assessment of Vortex Flow Management Devices on a High-Speed Civil Transport Configuration

    NASA Technical Reports Server (NTRS)

    Campbell, Bryan A.; Applin, Zachary T.; Kemmerly, Guy T.

    1999-01-01

    An experimental investigation of the effects of leading-edge vortex management devices on the subsonic performance of a high-speed civil transport (HSCT) configuration was conducted in the Langley 14- by 22-Foot Subsonic Tunnel. Data were obtained over a Mach number range of 0.14 to 0.27, with corresponding chord Reynolds numbers of 3.08 x 10 (sup 6) to 5.47 x 10 (sup 6). The test model was designed for a cruise Mach number of 2.7. During the subsonic high-lift phase of flight, vortical flow dominates the upper surface flow structure, and during vortex breakdown, this flow causes adverse pitch-up and a reduction of usable lift. The experimental results showed that the beneficial effects of small leading-edge vortex management devices located near the model reference center were insufficient to substantially affect the resulting aerodynamic forces and moments. However, devices located at or near the wiring apex region demonstrated potential for pitch control with little effect on overall lift.

  3. Module Configuration

    DOEpatents

    Oweis, Salah; D'Ussel, Louis; Chagnon, Guy; Zuhowski, Michael; Sack, Tim; Laucournet, Gaullume; Jackson, Edward J.

    2002-06-04

    A stand alone battery module including: (a) a mechanical configuration; (b) a thermal management configuration; (c) an electrical connection configuration; and (d) an electronics configuration. Such a module is fully interchangeable in a battery pack assembly, mechanically, from the thermal management point of view, and electrically. With the same hardware, the module can accommodate different cell sizes and, therefore, can easily have different capacities. The module structure is designed to accommodate the electronics monitoring, protection, and printed wiring assembly boards (PWAs), as well as to allow airflow through the module. A plurality of modules may easily be connected together to form a battery pack. The parts of the module are designed to facilitate their manufacture and assembly.

  4. Evaluation of traffic management implementation and testing issues within an ATM network

    NASA Astrophysics Data System (ADS)

    Owens, Kenneth R.; Burin, Kay

    1997-10-01

    Data and telecommunications industries are using ATM in a number of applications and in several configurations, enabling companies to re-engineer important functions and effectively distribute the workforce as needed. In this paper, the authors will define and offer solutions to the issues and concerns of telecom/datacom mangers when providing enhanced network access via ATM. We quantify several important traffic management implementation and testing issues within an ATM network. Guidelines are presented for meeting quality of service requirements, for mapping source traffic descriptors into different service classes, and for measuring various traffic management parameters. Abstract test suite development is discussed with respect to performance testing, and guidelines are presented on performance testing in network and in application designs.

  5. Implementation of Hepatitis Information Management System in Iran

    PubMed Central

    Reza, Safdari; Jebraeil, Farzi; Akbar, Nasiri Ali; Marjan, Ghazisaeedi; Reza, Taghavi Mohammad; Mehdi, Afshari; Mahlagha, Sargolzaee; Farhad, Taji

    2016-01-01

    Introduction: Nowadays, hepatitis is of the most important health priorities around the world, where information plays a very significant role in specialized diseases prevention planning, and policy- and decision-making processes. Thus, this study addressed challenges of hepatitis information management and investigated the outcomes of establishing a hepatitis information management system to overcome such challenges. To this end, this research intended to study the implementation of an Electronic hepatitis information management system. Methodology: This is an applied-developmental study with following specifications and procedures: preparation of study proposal and design, justification of the design’s stakeholders, approval of the design by the Postgraduate Education Council of Faculty, determination of pilot hepatitis control center, software development, deciding on control, prevention, and treatment centers, and finally development of a network-based system for collecting and managing hepatitis information. Findings: Results indicated that the inconsistency and lack of integrity of data, as well as the lack of communication between related units prevented timely information register of viral hepatic patients and services that are provided to them. This inhibited the possibility of considering a follow-up process. However, the implementation of this system and involvement of relevant units greatly solved these problems. Conclusion: Results show that the implementation of an electronic system for the management of hepatitis control, prevention, and treatment is a regional and national requirement; since, this system with its empowered infrastructure is capable in providing desired services to all laboratories, counseling and health centers, specialized clinics, and physicians connected to the hepatitis network. This enables them to follow up and monitor patients’ conditions. That mentioned system paves the way for the analysis of gathered information

  6. Integrated System Health Management: Foundational Concepts, Approach, and Implementation.

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John; Walker, Mark; Venkatesh, Meera; Kapadia, Ravi; Morris, Jon; Turowski, Mark; Smith, Harvey

    2009-01-01

    Implementation of integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive to an accurate and reliable assessment of its health. We present concepts, procedures, and a specific approach as a foundation for implementing a credible ISHM capability. The capability stresses integration of DIaK from all elements of a system. The intent is also to make possible implementation of on-board ISHM capability, in contrast to a remote capability. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems (rocket engine test facilities). The paper will address the following topics: 1. ISHM Model of a system 2. Detection of anomaly indicators. 3. Determination and confirmation of anomalies. 4. Diagnostic of causes and determination of effects. 5. Consistency checking cycle. 6. Management of health information 7. User Interfaces 8. Example implementation ISHM has been defined from many perspectives. We define it as a capability that might be achieved by various approaches. We describe a specific approach that has been matured throughout many years of development, and pilot implementations. ISHM is a capability that is achieved by integrating data, information, and knowledge (DIaK) that might be distributed throughout the system elements (which inherently implies capability to manage DIaK associated with distributed sub-systems). DIaK must be available to any element of a system at the right time and in accordance with a meaningful context. ISHM Functional Capability Level (FCL) is measured by how well a system performs the following

  7. 15 CFR 921.32 - Operation and management: Implementation of the management plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Operation and management: Implementation of the management plan. 921.32 Section 921.32 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE...

  8. Advances in Provenance Tracking and Configuration Management for Earth Science Data

    NASA Astrophysics Data System (ADS)

    Barkstrom, B. R.

    2008-12-01

    Production of Earth science data involves two different production paradigms: 1. Large scale, batch production in which a network of programs and files create a collection of data for access by users 2. Small scale, fine-grained production in which users interact with data in files or databases These two paradigms lead to two different models for configuration management of data. The first model is one that recognizes that data production is similar to other large-scale manufacturing processes and inventories both the collection of files, the processes the produce them, and the connections between the files and the processes. This model requires traversing the mathematical graph created by the network of processes and files. The second model is better described as a workflow that modifies the data by fine- grained transactions. In this case, provenance tracking is equivalent to tracking the history of transactions created by the workflow. In the large scale production paradigm, the rates of data ingest and the number of processes and files is sufficiently large that production needs to be automated. For example, in the upcoming NPOESS Preparatory Project (NPP), a typical time granularity for ingested data files is about 86 seconds. A single spectral channel from the VIIRS instrument on this satellite produces about 1000 files per day of calibrated data. Given the large number of channels on this instrument, production must be highly automated. An archive must be prepared to catalog millions of files per year. In this situation, data producers operate by creating source code that the production system compiles and links into executable objects. The executable code is often unchanged over many instances, so that production is very homogeneous over extended periods of time. This fact means that versioning of data products is also quite discrete and leads naturally to a hierarchical inventory structure. In the small scale production paradigm, the number of files is

  9. Meteorological disaster management and assessment system design and implementation

    NASA Astrophysics Data System (ADS)

    Tang, Wei; Luo, Bin; Wu, Huanping

    2010-11-01

    Disaster prevention and mitigation get more and more attentions by Chinese government, with the national economic development in recent years. Some problems exhibit in traditional disaster management, such as the chaotic management of data, low level of information, poor data sharing. To improve the capability of information in disaster management, Meteorological Disaster Management and Assessment System (MDMAS) was developed and is introduced in the paper. MDMAS uses three-tier C/S architecture, including the application layer, data layer and service layer. Current functions of MDMAS include the typhoon and rainstorm assessment, disaster data query and statistics, automatic cartography for disaster management. The typhoon and rainstorm assessment models can be used in both pre-assessment of pre-disaster and post-disaster assessment. Implementation of automatic cartography uses ArcGIS Geoprocessing and ModelBuilder. In practice, MDMAS has been utilized to provide warning information, disaster assessment and services products. MDMAS is an efficient tool for meteorological disaster management and assessment. It can provide decision supports for disaster prevention and mitigation.

  10. Adaptive Management Implementation: Glen Canyon Dam Adaptive Management Program Trinity River Restoration Program

    USGS Publications Warehouse

    Wittler, R.; McBain, S.; Stalnaker, C.

    2003-01-01

    Two adaptive management programs, the Glen Canyon Dam Adaptive Management Program (GCDAMP) and the Trinity River Restoration Program (TRRP) are examined. In both cases, the focus is on managing the aquatic and riparian systems downstream of a large dam and water supply project. The status of the two programs, lessons learned by the program managers and the Adaptive Environmental Assessment and Management (AEAM) evolution of the TRRP are discussed. The Trinity River illustrates some of the scientific uncertainities that a program faces and the ways the program evolves from concept through implementation.

  11. 77 FR 5048 - Notice of Bureau of Land Management Implementation of Recreation Resource Advisory Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... Bureau of Land Management Notice of Bureau of Land Management Implementation of Recreation Resource... Management, Interior. ACTION: Notice. SUMMARY: Notice is hereby given of the Bureau of Land Management's (BLM...., U.S. Department of the Interior, Bureau of Land......

  12. Integrated System Health Management: Foundational Concepts, Approach, and Implementation

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando

    2009-01-01

    A sound basis to guide the community in the conception and implementation of ISHM (Integrated System Health Management) capability in operational systems was provided. The concept of "ISHM Model of a System" and a related architecture defined as a unique Data, Information, and Knowledge (DIaK) architecture were described. The ISHM architecture is independent of the typical system architecture, which is based on grouping physical elements that are assembled to make up a subsystem, and subsystems combine to form systems, etc. It was emphasized that ISHM capability needs to be implemented first at a low functional capability level (FCL), or limited ability to detect anomalies, diagnose, determine consequences, etc. As algorithms and tools to augment or improve the FCL are identified, they should be incorporated into the system. This means that the architecture, DIaK management, and software, must be modular and standards-based, in order to enable systematic augmentation of FCL (no ad-hoc modifications). A set of technologies (and tools) needed to implement ISHM were described. One essential tool is a software environment to create the ISHM Model. The software environment encapsulates DIaK, and an infrastructure to focus DIaK on determining health (detect anomalies, determine causes, determine effects, and provide integrated awareness of the system to the operator). The environment includes gateways to communicate in accordance to standards, specially the IEEE 1451.1 Standard for Smart Sensors and Actuators.

  13. CAVEMAN: Configuration And VErsion MANagement. User`s guide, v2.1.2

    SciTech Connect

    Dyer, K.M.

    1993-03-12

    The mission of the CAVEMAN project is to provide the tools for large code systems so that those who work on them can perform source control and configuration control on UNIX-based file servers, rather than the LC Crays. An outside product called cvs has been chosen as the underlying source control system. The initials stand for {open_quotes}Concurrent Versions System{close_quotes}. It is a freeware program that runs on most UNIX stations. To quote from the cvs man page: {open_quotes}cvs is a front end to the rcs revision control system which extends the notion of revision control from a collection of files in a single directory to a hierarchical collection of directories consisting of revision controlled files. These directories and files can be combined together to form a software release. cvs provides the functions necessary to manage these software releases and to control the concurrent editing of source files among multiple software developers.{close_quotes} While cvs may be run directly, there are several tasks in the LLNL environment that it seemed either safer or easier to automate. CAVEMAN provides the needed functionality, generally in the form of wrappers to cvs.

  14. Flight evaluation of configuration management system concepts during transition to the landing approach for a powered-lift STOL aircraft

    NASA Technical Reports Server (NTRS)

    Franklin, J. A.; Innis, R. C.

    1980-01-01

    Flight experiments were conducted to evaluate two control concepts for configuration management during the transition to landing approach for a powered-lift STOL aircraft. NASA Ames' augmentor wing research aircraft was used in the program. Transitions from nominal level-flight configurations at terminal area pattern speeds were conducted along straight and curved descending flightpaths. Stabilization and command augmentation for attitude and airspeed control were used in conjunction with a three-cue flight director that presented commands for pitch, roll, and throttle controls. A prototype microwave system provided landing guidance. Results of these flight experiments indicate that these configuration management concepts permit the successful performance of transitions and approaches along curved paths by powered-lift STOL aircraft. Flight director guidance was essential to accomplish the task.

  15. KARMA: Managing business rules for specification to implementation

    SciTech Connect

    Sobieski, J.; Krovvidy, S.; McClintock, C.; Thorpe, M.

    1996-12-31

    Fannie Mae is a congressionally chartered, shareholder-owned company and the nation`s largest source of conventional home mortgage funds. Fannie Mae purchases and securitizes loans and is considered the leader in the secondary mortgage market. Because of its strong leadership role, Fannie Mae`s policies for loan eligibility set the standard in the mortgage industry and applying these policies consistently and effectively is critical to Fannie Mae`s mission and profitability. Fannie Mae`s policies for selling and servicing mortgage loans span the business functions of the secondary mortgage market and therefore are contained in many different software applications. Managing policy across multiple business applications became increasingly complex. To meet these demands, Fannie Mae developed KARMA (Knowledge Acquisition and Rule Management Assistant) and the Business Rule Server to allow policy changes to be implemented quickly throughout its software application environment and to provide business users with direct ownership and management of Fannie Mae`s policies in a way that seamlessly integrates policy into the software applications. KARMA is designed to support the management of these policies independent of the applications in which they are embedded. KARMA generates executable business rules which become part of the Business Rule Server. As a result, policy is managed centrally and no longer embedded in multiple applications. KARMA and the Business Rule Server have been running in production supporting the Cash Delivery application since July, 1995.

  16. Quantitative option analysis for implementation and management of landfills.

    PubMed

    Kerestecioğlu, Merih

    2016-09-01

    The selection of the most feasible strategy for implementation of landfills is a challenging step. Potential implementation options of landfills cover a wide range, from conventional construction contracts to the concessions. Montenegro, seeking to improve the efficiency of the public services while maintaining affordability, was considering privatisation as a way to reduce public spending on service provision. In this study, to determine the most feasible model for construction and operation of a regional landfill, a quantitative risk analysis was implemented with four steps: (i) development of a global risk matrix; (ii) assignment of qualitative probabilities of occurrences and magnitude of impacts; (iii) determination of the risks to be mitigated, monitored, controlled or ignored; (iv) reduction of the main risk elements; and (v) incorporation of quantitative estimates of probability of occurrence and expected impact for each risk element in the reduced risk matrix. The evaluated scenarios were: (i) construction and operation of the regional landfill by the public sector; (ii) construction and operation of the landfill by private sector and transfer of the ownership to the public sector after a pre-defined period; and (iii) operation of the landfill by the private sector, without ownership. The quantitative risk assessment concluded that introduction of a public private partnership is not the most feasible option, unlike the common belief in several public institutions in developing countries. A management contract for the first years of operation was advised to be implemented, after which, a long term operating contract may follow. PMID:27354014

  17. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  18. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  1. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  2. Implementation of a local area network for nursing management.

    PubMed Central

    Chapman, R. H.; Reiley, P.; McKinney, J.; Toomey, B.; Powers, E.; McCausland, M.

    1991-01-01

    This paper describes the planning and implementation of a Local Area Network (LAN) for the nursing service of a 504-bed urban teaching hospital. The major goals of the network were: support for nurse executives, nurse managers, and the departmental assistants assigned to administrative offices; increased efficiency and effectiveness of the nursing administrative areas; and improved communication systems. Collaboration between the nursing service and the Computer Information Center (CIC) resulted in a network of over 70 workstations, spanning 11 buildings. The network provides access to multiple programs that support clinical, managerial, and research activities. Gateways provide access to the hospital's two mainframes. PMID:1807569

  3. Implementing Model-Check for Employee and Management Satisfaction

    NASA Technical Reports Server (NTRS)

    Jones, Corey; LaPha, Steven

    2013-01-01

    This presentation will discuss methods to which ModelCheck can be implemented to not only improve model quality, but also satisfy both employees and management through different sets of quality checks. This approach allows a standard set of modeling practices to be upheld throughout a company, with minimal interaction required by the end user. The presenter will demonstrate how to create multiple ModelCheck standards, preventing users from evading the system, and how it can improve the quality of drawings and models.

  4. 76 FR 22944 - Pipeline Safety: Notice of Public Webinars on Implementation of Distribution Integrity Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... review DOT's complete Privacy Act Statement in the Federal Register published April 11, 2000 (65 FR 19477... on Implementation of Distribution Integrity Management Programs AGENCY: Pipeline and Hazardous... state and Federal Distribution Integrity Management Program Implementation Team (Team)...

  5. 76 FR 81911 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Forest Service National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule AGENCY: USDA Forest Service. ACTION: Notice of intent to establish an advisory... Advisory Committee for Implementation of the National Forest System Land Management Planning...

  6. Implementation of two new resource management information systems in Australia

    NASA Astrophysics Data System (ADS)

    Kessell, Stephen R.; Good, Roger B.; Hopkins, Angas J. M.

    1984-05-01

    This paper describes the development and implementation of PREPLAN, A Pristine Environment Planning Language and Simulator, for two conservation areas in Australia, Kosciusko National Park (New South Wales) and Tutanning Nature Reserve (Western Australia). PREPLAN was derived from the North American gradient modeling systems and the Forest Planning Language and Simulator (FORPLAN), but includes unique characteristics not previously available. PREPLAN includes an integrated resource management data base, modules for predicting site-specific vegetation, fuels, animals, fire behavior, and fire effects, and an English language instruction set. PREPLAN was developed specifically to provide available information and understanding of ecosystems to managers in a readily accessible and usable form, and to provide the motivation to conduct additional required research projects. An evaluation of the system's advantages and limitations is presented, and the way the utilization of such systems is improving natural area decision making throughout Australia is discussed.

  7. Implementation of schema management in STEP-based object-oriented engineering database management system

    NASA Astrophysics Data System (ADS)

    Xiao, Ke; Zhao, Zhige; Sun, Jiaguang

    1996-03-01

    Engineering database management system (EDBMS) is the kernel of CAD/CAM system integration, and object-oriented EDBMS (OOEDBMS) is the best implementation. While STEP is becoming the standard of product data exchange and representation, supporting STEP in engineering database becomes more and more important. In this paper we introduce the architecture of STEP based OOEDBMS in our CAD/CAM integrated system GHCAD. We focus on schema management and three-grade database management in OOEDBMS. Topics such as DDL compiler, transformation from EXPRESS to DDL, DDL tools are discussed. Finally further research directions of schema management in OOEDBMS are present.

  8. 49 CFR 232.603 - Design, interoperability, and configuration management requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... section was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR... 49 Transportation 4 2011-10-01 2011-10-01 false Design, interoperability, and configuration... Pneumatic (ECP) Braking Systems § 232.603 Design, interoperability, and configuration...

  9. 49 CFR 232.603 - Design, interoperability, and configuration management requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... section was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR... 49 Transportation 4 2010-10-01 2010-10-01 false Design, interoperability, and configuration... Pneumatic (ECP) Braking Systems § 232.603 Design, interoperability, and configuration...

  10. Integrated obesity care management system -implementation and research protocol

    PubMed Central

    Baillargeon, Jean-Patrice; Carpentier, André; Donovan, Denise; Fortin, Martin; Grant, Andrew; Simoneau-Roy, Judith; St-Cyr-Tribble, Denise; Xhignesse, Mariane; Langlois, Marie-France

    2007-01-01

    Background Nearly 50% of Canadians are overweight and their number is increasing rapidly. The majority of obese subjects are treated by primary care physicians (PCPs) who often feel uncomfortable with the management of obesity. The current research proposal is aimed at the development and implementation of an innovative, integrated, interdisciplinary obesity care management system involving both primary and secondary care professionals. Methods We will use both action and evaluative research in order to achieve the following specific objectives. The first one is to develop and implement a preceptorship-based continuing medical education (CME) program complemented by a web site for physicians and nurses working in Family Medicine Groups (FMGs). This CME will be based on needs assessment and will be validated by one FMG using questionnaires and semi structured interviews. Also, references and teaching tools will be available for participants on the web site. Our second objective is to establish a collaborative intra and inter-regional interdisciplinary network to enable on-going expertise update and networking for FMG teams. This tool consists of a discussion forum and monthly virtual meetings of all participants. Our third objective is to evaluate the implementation of our program for its ability to train 8 FMGs per year, the access and utilization of electronic tools and the participants' satisfaction. This will be measured with questionnaires, web logging tools and group interviews. Our fourth objective is to determine the impact for the participants regarding knowledge and expertise, attitudes and perceptions, self-efficacy for the management of obesity, and changes in FMG organization for obesity management. Questionnaires and interviews will be used for this purpose. Our fifth objective is to deliver transferable knowledge for health professionals and decision-makers. Strategies and pitfalls of setting up this program will also be identified. Conclusion This

  11. Configuration and specifications of an Unmanned Aerial Vehicle (UAV) for early site specific weed management.

    PubMed

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches). PMID:23483997

  12. Configuration and Specifications of an Unmanned Aerial Vehicle (UAV) for Early Site Specific Weed Management

    PubMed Central

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches). PMID:23483997

  13. Configuration Management and Infrastructure Monitoring Using CFEngine and Icinga for Real-time Heterogeneous Data Taking Environment

    NASA Astrophysics Data System (ADS)

    Poat, M. D.; Lauret, J.; Betts, W.

    2015-12-01

    The STAR online computing environment is an intensive ever-growing system used for real-time data collection and analysis. Composed of heterogeneous and sometimes groups of custom-tuned machines, the computing infrastructure was previously managed by manual configurations and inconsistently monitored by a combination of tools. This situation led to configuration inconsistency and an overload of repetitive tasks along with lackluster communication between personnel and machines. Globally securing this heterogeneous cyberinfrastructure was tedious at best and an agile, policy-driven system ensuring consistency, was pursued. Three configuration management tools, Chef, Puppet, and CFEngine have been compared in reliability, versatility and performance along with a comparison of infrastructure monitoring tools Nagios and Icinga. STAR has selected the CFEngine configuration management tool and the Icinga infrastructure monitoring system leading to a versatile and sustainable solution. By leveraging these two tools STAR can now swiftly upgrade and modify the environment to its needs with ease as well as promptly react to cyber-security requests. By creating a sustainable long term monitoring solution, the detection of failures was reduced from days to minutes, allowing rapid actions before the issues become dire problems, potentially causing loss of precious experimental data or uptime.

  14. Implementation of the Hungarian RW management project: Results and lessons

    SciTech Connect

    Vigassy, J.; Czoch, I.; Ormai, P.

    1995-12-31

    In 1993, a National RW Management Project was launched to solve handling and disposal of LLW/ILW of the Paks Nuclear Power Plant and to elaborate a complex strategy for the management of radwastes from the NPP, including HLW, spent fuel and wastes from the decommissioning. It was intended to implement the project so as to have selected the possible site (or sites) for the LLW/ILW waste repository by 1996. This paper describes the first results of the nation-wide screening for suitable areas and the problems related to the comparative evaluation process to select potential sites for a surface or geological LLW/ILW disposal facility. International tenders were issued to find the most appropriate technology to reduce the quantity of liquid and solid radwaste in the Nuclear Power Plant. Their results will provide a better basis for planning the characteristics and quantity of radwaste. The applications revealed that supercompacting can be ordered as a service when the need arises, and thus it was possible to re-allocate the funding originally foreseen for the equipment to treat solid wastes. Great importance is attached in the Project to public acceptance and PR activity. An expert organization was selected in a two-phase bidding process, and it was decided that detailed exploration of a potential site will take place only if public acceptance is assured. The original program of the Hungarian RW Management Project was extended in 1994 to perform on-site underground investigations (with Canadian support) in a silt-stone formation. The first results confirm that this is a potential site for deep geological disposal of HLW. The financial and legal framework of the RW management is also to be solved. The new law on nuclear energy -- now in preparation -- will deal with that problem in one of its most important chapters, defining the responsibilities for RW management and the sources of funding.

  15. Detection and management of a complex canal configuration in mesiobuccal root of maxillary first molar using three dimensional imaging.

    PubMed

    Deepa, Velagala L; Bollu, Indira Priyadharsini; Dhamaraju, Bhargavi; Yadla, Padmasri

    2016-04-01

    This case report discusses the identification and management of complex canal configuration of 3-2-1 in the mesiobuccal (MB) root of the maxillary left first molar. Careful attention to details of the pulpal floor and applying the knowledge of the laws of orifice location along with deepening the subpulpal groove with ultrasonic tips helped in identifying the three MB canals. Manual scouting helped in understanding the anatomic configuration; the use of three-dimensional imaging technique and spiral computed tomography (SCT) confirmed the same. SCT images showed buccolingually wide and bulbous mesiobuccal root with three separate canals at coronal third that merged into two canals in the middle and exited as a single canal at the apex. This article highlights the role of SCT in three-dimensionally analyzing the unseen rarest canal configurations that ultimately enabled the clinician to thoroughly explore, debride, and obturate the entire root canal system. PMID:27195233

  16. Detection and management of a complex canal configuration in mesiobuccal root of maxillary first molar using three dimensional imaging

    PubMed Central

    Deepa, Velagala L.; Bollu, Indira Priyadharsini; Dhamaraju, Bhargavi; Yadla, Padmasri

    2016-01-01

    This case report discusses the identification and management of complex canal configuration of 3-2-1 in the mesiobuccal (MB) root of the maxillary left first molar. Careful attention to details of the pulpal floor and applying the knowledge of the laws of orifice location along with deepening the subpulpal groove with ultrasonic tips helped in identifying the three MB canals. Manual scouting helped in understanding the anatomic configuration; the use of three-dimensional imaging technique and spiral computed tomography (SCT) confirmed the same. SCT images showed buccolingually wide and bulbous mesiobuccal root with three separate canals at coronal third that merged into two canals in the middle and exited as a single canal at the apex. This article highlights the role of SCT in three-dimensionally analyzing the unseen rarest canal configurations that ultimately enabled the clinician to thoroughly explore, debride, and obturate the entire root canal system. PMID:27195233

  17. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    SciTech Connect

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  18. Attitude control/momentum management of the Space Station Freedom for large angle torque-equilibrium-attitude configurations

    NASA Technical Reports Server (NTRS)

    Parlos, Alexander G.; Sunkel, John W.

    1990-01-01

    An attitude-control and momentum-management (ACMM) system for the Space Station in a large-angle torque-equilibrium-attitude (TEA) configuration is developed analytically and demonstrated by means of numerical simulations. The equations of motion for a rigid-body Space Station model are outlined; linearized equations for an arbitrary TEA (resulting from misalignment of control and body axes) are derived; the general requirements for an ACMM are summarized; and a pole-placement linear-quadratic regulator solution based on scheduled gains is proposed. Results are presented in graphs for (1) simulations based on configuration MB3 (showing the importance of accounting for the cross-inertia terms in the TEA estimate) and (2) simulations of a stepwise change from configuration MB3 to the 'assembly complete' stage over 130 orbits (indicating that the present ACCM scheme maintains sufficient control over slowly varying Space Station dynamics).

  19. The HSE management system in practice-implementation

    SciTech Connect

    Primrose, M.J.; Bentley, P.D.; Sykes, R.M.

    1996-11-01

    This paper sets out the necessary strategic issues that must be dealt with when setting up a management system for HSE. It touches on the setting of objectives using a form of risk matrix and the establishment of corporate risk tolerability levels. Such issue management is vital but can be seen as yet another corporate HQ initiative. It must therefore be linked, and made relevant to those in middle management tasked with implementing the system and also to those at risk {open_quote}at the sharp end{close_quote} of the business. Setting acceptance criteria is aimed at demonstrating a necessary and sufficient level of control or coverage for those hazards considered as being within the objective setting of the Safety or HSE Case. Critical risk areas addressed via the Safety Case, within Shell companies at least, must show how this coverage is extended to critical health and environmental issues. Methods of achieving this are various ranging from specific Case deliverables (like the Hazard Register and Accountability Matrices) through to the incorporation of topics from the hazard analysis in toolbox talks and meetings. Risk analysis techniques are increasingly seen as complementary rather than separate with environmental assessments, health risk assessment sand safety risk analyses taking place together and results being considered jointly. The paper ends with some views on the way ahead regarding the linking of risk decisions to target setting at the workplace and views on how Case information may be retrieved and used on a daily basis.

  20. Model for Prioritizing Best Management Practice Implementation: Sediment Load Reduction

    NASA Astrophysics Data System (ADS)

    Jang, Taeil; Vellidis, George; Hyman, Jeffrey B.; Brooks, Erin; Kurkalova, Lyubov A.; Boll, Jan; Cho, Jaepil

    2013-01-01

    Understanding the best way to allocate limited resources is a constant challenge for water quality improvement efforts. The synoptic approach is a tool for geographic prioritization of these efforts. It uses a benefit-cost framework to calculate indices for functional criteria in subunits (watersheds, counties) of a region and then rank the subunits. The synoptic approach was specifically designed to incorporate best professional judgment in cases where information and resources are limited. To date, the synoptic approach has been applied primarily to local or regional wetland restoration prioritization projects. The goal of this work was to develop a synoptic model for prioritizing watersheds within which suites of agricultural best management practices (BMPs) can be implemented to reduce sediment load at the watershed outlets. The model ranks candidate watersheds within an ecoregion or river basin so that BMP implementation within the highest ranked watersheds will result in the most sediment load reduction per conservation dollar invested. The model can be applied anywhere and at many scales provided that the selected suite of BMPs is appropriate for the evaluation area's biophysical and climatic conditions. The model was specifically developed as a tool for prioritizing BMP implementation efforts in ecoregions containing watersheds associated with the USDA-NRCS conservation effects assessment project (CEAP). This paper presents the testing of the model in the little river experimental watershed (LREW) which is located near Tifton, Georgia, USA and is the CEAP watershed representing the southeastern coastal plain. The application of the model to the LREW demonstrated that the model represents the physical drivers of erosion and sediment loading well. The application also showed that the model is quite responsive to social and economic drivers and is, therefore, best applied at a scale large enough to ensure differences in social and economic drivers across the

  1. NASE 2015: Implementation of a Management Quality System

    NASA Astrophysics Data System (ADS)

    Ros, Rosa Maria; García, Beatriz; Santa Maria, Delia

    2015-08-01

    ISO 29990:2010, Learning services for non-formal education and training - Basic requirements for service providers, proposes enhance transparency and allow comparison on a worldwide basis of learning services, offering a single alternative backed by international consensus to the huge variety of national service and management standards which now exists in the field of non-formal learning. The objective of ISO 29990:2010 is to provide a generic model for quality professional practice and performance, and a common reference for learning service providers and their clients in the design, development and delivery of non-formal education, training and development.NASE project, which was born as a consequence of the implementation of IAU-10 Years Strategic Plan and it is in agreement with the proposal to increase the interest and efforts of IAU on schools before the university and constitutes good objective for the implementation of ISO 29990-2010.Taking into account the main objectives of the Strategic Plan, it is possible to remark that NASE acts on all the education levels, and had, during the past 5 years a big impact because Ministries of Education, Universities and Planetariums are involved. After 5 years NASE organized more than 60 courses in about 20 countries distributed in America, Africa, Asia and Europe. In many countries local governments changed their curriculum according NASE course contents (i.e. Nicaragua, Argentina and Honduras).The knowledge obtained by teachers is evaluated by the department of education of the local government or universities who participated. NASE acts as part of the Professional formation of Professors in Science and in this sense is a Program directed to the Tertiary and University Education.After 5 years of development, we present the implementation of a Quality Management System, according to ISO 29990:2010, devoted to Learning services for non-formal education and training. Basic requirements for service providers, and show

  2. E-Resources Management: How We Positioned Our Organization to Implement an Electronic Resources Management System

    ERIC Educational Resources Information Center

    White, Marilyn; Sanders, Susan

    2009-01-01

    The Information Services Division (ISD) of the National Institute of Standards and Technology (NIST) positioned itself to successfully implement an electronic resources management system. This article highlights the ISD's unique ability to "team" across the organization to realize a common goal, develop leadership qualities in support of…

  3. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  4. Tiltrotor noise reduction through flight trajectory management and aircraft configuration control

    NASA Astrophysics Data System (ADS)

    Gervais, Marc

    A tiltrotor can hover, takeoff and land vertically as well as cruise at high speeds and fly long distances. Because of these unique capabilities, tiltrotors are envisioned as an aircraft that could provide a solution to the issue of airport gridlock by operating on stub runways, helipads, or from smaller regional airports. However, during an approach-to-land a tiltrotor is susceptible to radiating strong impulsive noise, in particular, Blade-Vortex Interaction noise (BVI), a phenomenon highly dependent on the vehicle's performance-state. A mathematical model was developed to predict the quasi-static performance characteristics of a tiltrotor during a converting approach in the longitudinal plane. Additionally, a neural network was designed to model the acoustic results from a flight test of the XV-15 tiltrotor as a function of the aircraft's performance parameters. The performance model was linked to the neural network to yield a combined performance/acoustic model that is capable of predicting tiltrotor noise emitted during a decelerating approach. The model was then used to study noise trends associated with different combinations of airspeed, nacelle tilt, and flight path angle. It showed that BVI noise is the dominant noise source during a descent and that its strength increases with steeper descent angles. Strong BVI noise was observed at very steep flight path angles, suggesting that the tiltrotor's high downwash prevents the wake from being pushed above the rotor, even at such steep descent angles. The model was used to study the effects of various aircraft configuration and flight trajectory parameters on the rotor inflow, which adequately captured the measured BVI noise trends. Flight path management effectively constrained the rotor inflow during a converting approach and thus limited the strength of BVI noise. The maximum deceleration was also constrained by controlling the nacelle tilt-rate during conversion. By applying these constraints, low BVI noise

  5. STARDUST: implementing a new manage-to-budget paradigm

    NASA Astrophysics Data System (ADS)

    Atkins, Kenneth L.; Martin, Bredt D.; Vellinga, Joseph M.; Price, Rick A.

    2003-01-01

    the leveraging goal by serving two projects, STARDUST and Mars Surveyor '98. It avoided duplicate project-unique personnel structures and offered cost benefits to each project. This paper provides details and example metrics characterizing the aggressive application of the design-to-cost paradigm and implementation by the STARDUST management team to achieve success under the Discovery Program budget constraints.

  6. Avionics Configuration Assessment for Flightdeck Interval Management: A Comparison of Avionics and Notification Methods

    NASA Technical Reports Server (NTRS)

    Latorella, Kara A.

    2015-01-01

    Flightdeck Interval Management is one of the NextGen operational concepts that FAA is sponsoring to realize requisite National Airspace System (NAS) efficiencies. Interval Management will reduce variability in temporal deviations at a position, and thereby reduce buffers typically applied by controllers - resulting in higher arrival rates, and more efficient operations. Ground software generates a strategic schedule of aircraft pairs. Air Traffic Control (ATC) provides an IM clearance with the IM spacing objective (i.e., the TTF, and at which point to achieve the appropriate spacing from this aircraft) to the IM aircraft. Pilots must dial FIM speeds into the speed window on the Mode Control Panel in a timely manner, and attend to deviations between actual speed and the instantaneous FIM profile speed. Here, the crew is assumed to be operating the aircraft with autothrottles on, with autopilot engaged, and the autoflight system in Vertical Navigation (VNAV) and Lateral Navigation (LNAV); and is responsible for safely flying the aircraft while maintaining situation awareness of their ability to follow FIM speed commands and to achieve the FIM spacing goal. The objective of this study is to examine whether three Notification Methods and four Avionics Conditions affect pilots' performance, ratings on constructs associated with performance (workload, situation awareness), or opinions on acceptability. Three Notification Methods (alternate visual and aural alerts that notified pilots to the onset of a speed target, conformance deviation from the required speed profile, and reminded them if they failed to enter the speed within 10 seconds) were examined. These Notification Methods were: VVV (visuals for all three events), VAV (visuals for all three events, plus an aural for speed conformance deviations), and AAA (visual indications and the same aural to indicate all three of these events). Avionics Conditions were defined by the instrumentation (and location) used to

  7. The Implementation of Policies Regulating Institutional Data Management

    NASA Astrophysics Data System (ADS)

    Gebauer, Petra; Kirchner, Ingo; Hirt, Mirjam

    2013-04-01

    Data management in geosciences, especially at university and other research institutes commonly isn't very well coordinated. Due to changing staff and limited funding this topic has no priority in general. The process to implement policies regulating data management in an university institute is complex. First of all existing structures and workflows had to be reviewed. That means an inventory of different data sets, reviewing quality tests, but also data requirements of scientists as well as their willingness to follow rules simplifying their work. Awareness of complying with regulations is essential for the acceptance of policies. A leading team, formed by several scientists, will bring together different points of view to control the development of institutional policies. Determining the actual state of personal data management using a questionary was one of the activities in the project EWIG (Developing workflow components for long-term archiving of research data in geosciences). The intention of the project is to support geoscientists in transferring their data in a standardized way for storage in digital long-term archives and in using documented data from these archives. Project partners are Deutsches GeoForschungsZentrum Potsdam and Konrad-Zuse-Zentrum für Informationstechnik Berlin. Other activities were to discuss existing problems and approved solutions with many institutions and tried to find out, where are the gaps in already realized workflows and which structures could be an ideal model to be generalized. Policies for the workflow independent from the working area will be defined. University lectures were started to teach future scientific generations from the beginning on how to deal with all sorts of different data in a transparent way. Their feedback will be used to improve data documentations and data curation, so that the re-use of archived research data will be encouraged. The whole process of different approaches in the project EWIG, funded

  8. Systems Modeling to Implement Integrated System Health Management Capability

    NASA Technical Reports Server (NTRS)

    Figueroa, Jorge F.; Walker, Mark; Morris, Jonathan; Smith, Harvey; Schmalzel, John

    2007-01-01

    ISHM capability includes: detection of anomalies, diagnosis of causes of anomalies, prediction of future anomalies, and user interfaces that enable integrated awareness (past, present, and future) by users. This is achieved by focused management of data, information and knowledge (DIaK) that will likely be distributed across networks. Management of DIaK implies storage, sharing (timely availability), maintaining, evolving, and processing. Processing of DIaK encapsulates strategies, methodologies, algorithms, etc. focused on achieving high ISHM Functional Capability Level (FCL). High FCL means a high degree of success in detecting anomalies, diagnosing causes, predicting future anomalies, and enabling health integrated awareness by the user. A model that enables ISHM capability, and hence, DIaK management, is denominated the ISHM Model of the System (IMS). We describe aspects of the IMS that focus on processing of DIaK. Strategies, methodologies, and algorithms require proper context. We describe an approach to define and use contexts, implementation in an object-oriented software environment (G2), and validation using actual test data from a methane thruster test program at NASA SSC. Context is linked to existence of relationships among elements of a system. For example, the context to use a strategy to detect leak is to identify closed subsystems (e.g. bounded by closed valves and by tanks) that include pressure sensors, and check if the pressure is changing. We call these subsystems Pressurizable Subsystems. If pressure changes are detected, then all members of the closed subsystem become suspect of leakage. In this case, the context is defined by identifying a subsystem that is suitable for applying a strategy. Contexts are defined in many ways. Often, a context is defined by relationships of function (e.g. liquid flow, maintaining pressure, etc.), form (e.g. part of the same component, connected to other components, etc.), or space (e.g. physically close

  9. IPM: Integrated Pest Management Kit for Building Managers. How To Implement an Integrated Pest Management Program in Your Building(s).

    ERIC Educational Resources Information Center

    Mitchell, Brad

    This management kit introduces building managers to the concept of Integrated Pest Management (IPM), and provides the knowledge and tools needed to implement an IPM program in their buildings. It discusses the barriers to implementing an IPM program, why such a program should be used, and the general guidelines for its implementation. Managerial…

  10. Improving the Effectiveness of Health Care Innovation Implementation: Middle Managers as Change Agents

    PubMed Central

    Birken, Sarah A.; Lee, Shoou-Yih Daniel; Weiner, Bryan J.; Chin, Marshall H.; Schaefer, Cynthia T.

    2013-01-01

    The rate of successful health care innovation implementation is dismal. Middle managers have a potentially important yet poorly understood role in health care innovation implementation. This study used self-administered surveys and interviews of middle managers in health centers that implemented an innovation to reduce health disparities to address the questions: Does middle managers’ commitment to health care innovation implementation influence implementation effectiveness? If so, in what ways does their commitment influence implementation effectiveness? Although quantitative survey data analysis results suggest a weak relationship, qualitative interview data analysis results indicate that middle managers’ commitment influences implementation effectiveness when middle managers are proactive. Scholars should account for middle managers’ influence in implementation research, and health care executives may promote implementation effectiveness by hiring proactive middle managers and creating climates in which proactivity is rewarded, supported, and expected. PMID:22930312

  11. Graphical User Interface Development and Design to Support Airport Runway Configuration Management

    NASA Technical Reports Server (NTRS)

    Jones, Debra G.; Lenox, Michelle; Onal, Emrah; Latorella, Kara A.; Lohr, Gary W.; Le Vie, Lisa

    2015-01-01

    The objective of this effort was to develop a graphical user interface (GUI) for the National Aeronautics and Space Administration's (NASA) System Oriented Runway Management (SORM) decision support tool to support runway management. This tool is expected to be used by traffic flow managers and supervisors in the Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facilities.

  12. IBFAN Africa training initiatives: code implementation and lactation management.

    PubMed

    Mbuli, A

    1994-01-01

    As part of an ongoing effort to halt the decline of breast feeding rates in Africa, 35 representatives of 12 different African countries met in Mangochi, Malawi, in February 1994. The Code of Marketing of Breastmilk Substitutes was scrutinized. National codes were drafted based on the "Model Law" of the IBFAN Code Documentation Centre (ICDC), Penang. Mechanisms of implementation, specific to each country, were developed. Strategies for the promotion, protection, and support of breast feeding, which is very important to child survival in Africa, were discussed. The training course was organized by ICDC, in conjunction with IBFAN Africa, and with the support of the United Nations Children's Fund (UNICEF) and the World Health Organization (WHO). Countries in eastern, central, and southern Africa were invited to send participants, who included professors, pediatricians, nutritionists, MCH personnel, nurses, and lawyers. IBFAN Africa has also been conducting lactation management workshops for a number of years in African countries. 26 health personnel (pediatricians, nutritionists, senior nursing personnel, and MCH workers), representing 7 countries in the southern African region, attended a training of trainers lactation management workshop in Swaziland in August, 1993 with the support of their UNICEF country offices. The workshop included lectures, working sessions, discussions, and slide and video presentations. Topics covered included national nutrition statuses, the importance of breast feeding, the anatomy and physiology of breast feeding, breast feeding problems, the International Code of Marketing, counseling skills, and training methods. The field trip to a training course covering primary health care that was run by the Traditional Healers Organization (THO) in Swaziland was of particular interest because of the strong traditional medicine sector in many African countries. IBFAN Africa encourages use of community workers (traditional healers, Rural Health

  13. Implementation Plan: Jasper Management Prestart Review (Surrogate Material Experiments)

    SciTech Connect

    Cooper, W.E.

    2000-09-29

    Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requires system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.

  14. Managing IT service management implementation complexity: from the perspective of the Warfield Version of systems science

    NASA Astrophysics Data System (ADS)

    Wan, Jiangping; Jones, James D.

    2013-11-01

    The Warfield version of systems science supports a wide variety of application areas, and is useful to practitioners who use the work program of complexity (WPOC) tool. In this article, WPOC is applied to information technology service management (ITSM) for managing the complexity of projects. In discussing the application of WPOC to ITSM, we discuss several steps of WPOC. The discovery step of WPOC consists of a description process and a diagnosis process. During the description process, 52 risk factors are identified, which are then narrowed to 20 key risk factors. All of this is done by interviews and surveys. Root risk factors (the most basic risk factors) consist of 11 kinds of common 'mindbugs' which are selected from an interpretive structural model. This is achieved by empirical analysis of 25 kinds of mindbugs. (A lesser aim of this research is to affirm that these mindbugs developed from a Western mindset have corresponding relevance in a completely different culture: the Peoples Republic of China.) During the diagnosis process, the relationships among the root risk factors in the implementation of the ITSM project are identified. The resolution step of WPOC consists of a design process and an implementation process. During the design process, issues related to the ITSM application are compared to both e-Government operation and maintenance, and software process improvement. The ITSM knowledge support structure is also designed at this time. During the implementation process, 10 keys to the successful implementation of ITSM projects are identified.

  15. The design and implementation of a ventilator-management advisor.

    PubMed

    Rutledge, G W; Thomsen, G E; Farr, B R; Tovar, M A; Polaschek, J X; Beinlich, I A; Sheiner, L B; Fagan, L M

    1993-02-01

    VentPlan is an implementation of the architecture developed by the qualitative-quantitative (QQ) research group for combining qualitative and quantitative computation in a ventilator-management advisor (VMA). VentPlan calculates recommended settings for four controls of a ventilator by evaluating the predicted effects of alternative ventilator settings. A belief network converts clinical diagnoses to distributions on physiologic parameters. A mathematical-modeling module applies a patient-specific mathematical model of cardiopulmonary physiology to predict the effects of alternative ventilator settings. A decision-theoretic plan evaluator ranks the predicted effects of alternative ventilator settings according to a multiattribute-value model that specifies physician preferences for ventilator treatments. Our architecture allows VentPlan to interpret quantitative observations in light of the clinical context (such as the clinical diagnosis). We report a retrospective study of the ventilator-setting changes encountered in postoperative patients in a surgical intensive-care unit (ICU). We conclude that the QQ architecture allows VentPlan to apply a patient-specific physiologic model to calculate ventilator settings that are optimal with respect to a decision-theoretic value model describing physician preferences for setting the ventilator. PMID:8358487

  16. Implementation of an Anesthesia Information Management System (AIMS)

    PubMed Central

    Douglas, James R.; Ritter, Melody J.

    2011-01-01

    During the administration of anesthesia, the anesthesia provider has historically created a paper record, charted manually, that included extensive patient care–related data (vital signs, other parameters, etc) and commentaries. DocuSys, a proprietary anesthesia information management system (AIMS), creates an electronic version of the anesthesia record and provides additional information. It electronically captures data from clinical monitors and other sources, including scheduling applications and laboratory computers. The AIMS facilitates chart entries such as drug doses and case narratives. Benefits of an AIMS include improved legibility of the anesthesia record and greater efficiency in documentation efforts. Use of the AIMS assists the practitioner with decision support logic, such as the timing of antibiotic administration and the inclusion of legally required documentation. Upon case completion, the AIMS data are immediately available to other information systems, such as billing and medical records. Data can be made available from a single case or, more important, from thousands of cases to analyze variables such as efficiency of services, adherence to best practices, patient outcomes, and clinical research. The AIMS was deployed at the main campus of the Ochsner Health System on March 26, 2009. In this article, we discuss the issues involved in the AIMS implementation process: the successes, surprises, and continued challenges. PMID:21734847

  17. Implementing ecosystem management in public agencies: lessons from the U.S. Bureau of Land Management and the Forest Service.

    PubMed

    Koontz, Tomas M; Bodine, Jennifer

    2008-02-01

    Ecosystem management was formally adopted over a decade ago by many U.S. natural resource agencies, including the Forest Service and the Bureau of Land Management. This approach calls for management based on stakeholder collaboration; interagency cooperation; integration of scientific, social, and economic information; preservation of ecological processes; and adaptive management. Results of previous studies indicate differences in the extent to which particular components of ecosystem management would be implemented within the U.S. Forest Service and the Bureau of Land Management and suggest a number of barriers thought to impede implementation. Drawing on survey and interview data from agency personnel and stakeholders, we compared levels of ecosystem-management implementation in the Forest Service and Bureau of Land Management and identified the most important barriers to implementation. Agency personnel perceived similarly high levels of implementation on many ecosystem-management components, whereas stakeholders perceived lower levels. Agencies were most challenged by implementation of preservation of ecological processes, adaptive management, and integration of social and economic information, whereas the most significant barriers to implementation were political, cultural, and legal. PMID:18254853

  18. Successfully Managing the Implementation of a DIP System.

    ERIC Educational Resources Information Center

    Baker, Nick

    1993-01-01

    Describes a British oil company's implementation of a document image processing system emphasizing the business and organizational issues. The project's objectives, perceived benefits, and issues of system ownership, planning, and implementation are described. An appendix includes documentation tables. (EAM)

  19. "It's All about Standardisation"--Exploring the Digital (Re)Configuration of School Management and Administration

    ERIC Educational Resources Information Center

    Selwyn, Neil

    2011-01-01

    Schools have long made use of digital technologies to support the co-ordination of management and administrative processes--not least "management information systems", "virtual learning environments" and other "institutional technologies". The last five years have seen the convergence of these technologies into integrated rather than separate…

  20. Behavior-based network management: a unique model-based approach to implementing cyber superiority

    NASA Astrophysics Data System (ADS)

    Seng, Jocelyn M.

    2016-05-01

    Behavior-Based Network Management (BBNM) is a technological and strategic approach to mastering the identification and assessment of network behavior, whether human-driven or machine-generated. Recognizing that all five U.S. Air Force (USAF) mission areas rely on the cyber domain to support, enhance and execute their tasks, BBNM is designed to elevate awareness and improve the ability to better understand the degree of reliance placed upon a digital capability and the operational risk.2 Thus, the objective of BBNM is to provide a holistic view of the digital battle space to better assess the effects of security, monitoring, provisioning, utilization management, allocation to support mission sustainment and change control. Leveraging advances in conceptual modeling made possible by a novel advancement in software design and implementation known as Vector Relational Data Modeling (VRDM™), the BBNM approach entails creating a network simulation in which meaning can be inferred and used to manage network behavior according to policy, such as quickly detecting and countering malicious behavior. Initial research configurations have yielded executable BBNM models as combinations of conceptualized behavior within a network management simulation that includes only concepts of threats and definitions of "good" behavior. A proof of concept assessment called "Lab Rat," was designed to demonstrate the simplicity of network modeling and the ability to perform adaptation. The model was tested on real world threat data and demonstrated adaptive and inferential learning behavior. Preliminary results indicate this is a viable approach towards achieving cyber superiority in today's volatile, uncertain, complex and ambiguous (VUCA) environment.

  1. Validation and configuration management plan for the KE basins KE-PU spreadsheet code

    SciTech Connect

    Harris, R.A.

    1996-03-11

    This report provides documentation of the spreadsheet KE-PU software that is used to verify compliance with the Operational Safety Requirement and Process Standard limit on the amount of plutonium in the KE-Basin sandfilter backwash pit. Included are: A summary of the verification of the method and technique used in KE-PU that were documented elsewhere, the requirements, plans, and results of validation tests that confirm the proper functioning of the software, the procedures and approvals required to make changes to the software, and the method used to maintain configuration control over the software.

  2. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial Valley Air Pollution Control District AGENCY: Environmental Protection... Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution Control...

  3. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  4. Integrated System Health Management (ISHM): Systematic Capability Implementation

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Holland, Randy; Schmalzwel, John; Duncavage, Dan

    2006-01-01

    This paper provides a credible approach for implementation of ISHM capability in any system. The requirements and processes to implement ISHM capability are unique in that a credible capability is initially implemented at a low level, and it evolves to achieve higher levels by incremental augmentation. In contrast, typical capabilities, such as thrust of an engine, are implemented once at full Functional Capability Level (FCL), which is not designed to change during the life of the product. The approach will describe core ingredients (e.g. technologies, architectures, etc.) and when and how ISHM capabilities may be implemented. A specific architecture/taxonomy/ontology will be described, as well as a prototype software environment that supports development of ISHM capability. This paper will address implementation of system-wide ISHM as a core capability, and ISHM for specific subsystems as expansions and evolution, but always focusing on achieving an integrated capability.

  5. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    ERIC Educational Resources Information Center

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  6. Design and Implementation of a Key-Lifecycle Management System

    NASA Astrophysics Data System (ADS)

    Björkqvist, Mathias; Cachin, Christian; Haas, Robert; Hu, Xiao-Yu; Kurmus, Anil; Pawlitzek, René; Vukolić, Marko

    Key management is the Achilles' heel of cryptography. This work presents a novel Key-Lifecycle Management System (KLMS), which addresses two issues that have not been addressed comprehensively so far.

  7. Tailoring Green Infrastructure Implementation Scenarios based on Stormwater Management Objectives

    EPA Science Inventory

    Green infrastructure (GI) refers to stormwater management practices that mimic nature by soaking up, storing, and controlling onsite. GI practices can contribute reckonable benefits towards meeting stormwater management objectives, such as runoff peak shaving, volume reduction, f...

  8. Implementing a Nurse Manager Profile to Improve Unit Performance.

    PubMed

    Krugman, Mary E; Sanders, Carolyn L

    2016-06-01

    Nurse managers face significant pressures in the rapidly changing healthcare environment. Staying current with multiple sources of data, including reports that detail institutional and unit performance outcomes, is particularly challenging. A Nurse Manager Customized Profile was developed at a western academic hospital to provide a 1-page visual of pertinent data to help managers and director supervisors focus coaching to improve unit performance. Use of the Decisional Involvement Scale provided new insights into measuring manager performance. PMID:27163873

  9. Design and implementation of web service-based mobile reply testing management system

    NASA Astrophysics Data System (ADS)

    Gao, Liang; Han, Yu-min

    2013-03-01

    This paper introduces the design and implementation of a reply testing management system that based-on C#, Web Service and ASP .Net. With the system, teachers can manage reply site through Windows Mobile, judges can grade onscene by visiting WAP site through GPRS. Then this paper discusses details of the implementation and key technologies of the system.

  10. The Implementation of Enrollment Management at Two Public Universities Experiencing Demographic and Funding Challenges

    ERIC Educational Resources Information Center

    Lee, Stephen

    2010-01-01

    The purpose of this study was to evaluate the implementation of enrollment management at two public universities. The theoretical framework was conceptual and centered on the effectiveness of the implementation process as a pivotal factor in the development of a comprehensive enrollment management operation. This multi-site case study included 14…

  11. Attitudes of North Dakota Implement Dealership Managers towards a Continuing Management Education Program. Report of the Research Study.

    ERIC Educational Resources Information Center

    Kleene, Marvin D.; Priebe, Donald W.

    Conducted as part of a Farm Management Education Research and Development Project which was examining the use of variations of the Farm Management Education Program in meeting the managerial needs of agribusinesses, the descriptive study reported here was done to determine attitudes of 359 farm implement dealership managers in North Dakota towards…

  12. Implementing Human Resources Management (HRM) within Dutch VET Institutions: Examining the Fostering and Hindering Factors

    ERIC Educational Resources Information Center

    Runhaar, Piety; Sanders, Karin

    2013-01-01

    Vocational Education and Training (VET) Institutions face serious challenges, like the implementation of competence-based education and upcoming teacher shortages, which urge them to implement Human Resources Management policy and practices (HRM). The implementation of HRM, however, often stagnates. This paper describes a qualitative study--in…

  13. Consultation, Follow-up, and Implementation of Behavior Management Interventions in General Education.

    ERIC Educational Resources Information Center

    Noell, George H.; Duhon, Gary J.; Gatti, Susan L.; Connell, James E.

    2002-01-01

    Examines general education teachers' implementation of behavior management interventions following consultation. Interventions were implemented for 8 elementary school students referred for consultation and intervention due to disruptive behavior in the classroom. Initial implementation varied across teachers, but became unstable or exhibited a…

  14. Energy management of electric and hybrid vehicles dependent on powertrain configuration

    NASA Astrophysics Data System (ADS)

    Varga, Bogdan Ovidiu

    2012-06-01

    Electric and hybrid vehicles are going to become the most reliable source of transport for future years. The CO2 and NOx targets in Euro 6 normative puts the producers of vehicles in a dilemma, whether to adapt the internal combustion engines further, or to develop hybrid or electric power trains that are going to reach the pollution limit of the future norms or to go below that. Before acting a well-developed strategy in determining the optimum power flow has to be developed by producers; CRUISE software is a tool with the unique and special characteristics to determine the optimum in this highly important area. Whether electric vehicle, electric vehicle with range extender or a hybrid with CVT or planetary gearbox, the complexity of the mathematical modules remains the same, giving the developer the possibility to create complex functions and distinctive characteristics for each component of the vehicle. With such a powerful tool it becomes extremely easy to evaluate the energy flow in all directions, from electric machine to the battery, from electric machine to the power generator, and from the electric machine to the internal combustion engine. Applying to the (Electric Vehicle, Electric Vehicle with Range Extender, Hybrid vehicle with CVT, Hybrid vehicle with planetary gear set) the ECE-15 in a virtual environment (urban driving cycle) the simulation results show a different usage, rate of storage and efficiency concerning the energy, this being dependent of the power train configuration in most part.

  15. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  16. Development and Implementation of a Program Management Maturity Model

    SciTech Connect

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  17. A Contingency Model for Implementing a Classroom Management System.

    ERIC Educational Resources Information Center

    Hatch, Douglas D.

    An outline is presented of a contingency plan for developing sound classroom management practices. The plan revolves around a conceptual model of the different maturity levels of each individual staff member in relation to their classroom management skills. In the model, a group of peer observers monitors the progress of those staff members whose…

  18. Implementing Results-Oriented Management in Academic Libraries.

    ERIC Educational Resources Information Center

    Waldhart, Thomas J.

    1978-01-01

    Management philosophy has shifted from emphasizing organization and control of library activities to concern with achievement of predefined organizational results through participation and coordination. This article examines some aspects of results-oriented management that have impeded adoption and considers what its future is likely to be in…

  19. Financial Management. Guide to Standards and Implementation. Career & Technology Studies.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Curriculum Standards Branch.

    This Alberta curriculum guide defines competencies that help students build daily living skills, investigate career options in financial management, use technology in the financial management field effectively and efficiently, and prepare for entry into the workplace or related postsecondary programs. The first section provides a program rationale…

  20. Management By Objectives: An Analysis of Recommendations for Implementation.

    ERIC Educational Resources Information Center

    Carpenter, William B.; And Others

    Because today's college administrators must find an acceptable balance between educational desirability, economic feasibility, political expediency, social relevancy, and philosophical defensibility, many have turned to Management by Objectives (MBO), which coordinates management activities with institutional goals. MBO is concerned with the…

  1. Quality Management of Academic Development Work: Implementation Issues and Challenges

    ERIC Educational Resources Information Center

    Gray, Kathleen; Radloff, Alex

    2006-01-01

    This paper summarises current ideas about the place of academic development in the twenty-first century university. It focuses on aligning the leadership and management of academic development work with the "ownership" of such work by its key stakeholders--teaching academics, university management and the wider academic development community--and…

  2. Implementing Quality Management in the University: The Role of Leadership in Finnish Universities

    ERIC Educational Resources Information Center

    Anyamele, Stephen Chukwu

    2005-01-01

    This paper investigates how university leaders in Finland implement quality management in their respective institutions. The study uses a modified model of the European Foundation for Quality Management (EFQM) Excellence Model as a theoretical base in eliciting information on quality management strategies from the senior academic leaders in these…

  3. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  4. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  5. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  6. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  7. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  8. A Course in Administration for Managers of Information Services: Design, Implementation and Topical Outline.

    ERIC Educational Resources Information Center

    Wasserman, Paul; Rizzo, John R.

    A topical outline for courses in administration for managers of information services, and a set of guidelines for designing and implementing these courses are included in this manual for those responsible for planning, developing, and offering management training programs. Key elements in presenting and developing management skills of information…

  9. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD),...

  10. 7 CFR Exhibit B to Subpart G of... - Development and Implementation of Natural Resource Management Guide

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... classifications for agricultural land protection; and o. Coastal Zone Management Areas. 6. The Administrator shall... Management Guide B Exhibit B to Subpart G of Part 1940 Agriculture Regulations of the Department of... Implementation of Natural Resource Management Guide 1. The State Director shall complete the natural...

  11. Transportation and disposal configuration for DOE-managed low-level and mixed low-level waste

    SciTech Connect

    Johnsen, T.

    1993-06-01

    This report briefly examines the current U.S. Department of Energy complex-wide configuration for transportation and disposal of low-level and mixed low-level waste, and also retraces the historical sequence of events and rationale that has guided its development. The study determined that Nevada Test Site and the Hanford Site are the only two sites that currently provide substantial disposal services for offsite low-level waste generators. It was also determined that mixed low-level waste shipments are infrequent and are generally limited to shipments to offsite commercial treatment facilities or other Department of Energy sites for storage. The current alignment of generator to disposal site for low-level waste shipments is generally consistent with the programmatic mission of the generator; that is, defense-generated waste is shipped to the Nevada Test Site and research-generated waste is transported to the Hanford Site. The historical development of the current configuration was resurrected by retrieving Department of Energy documentation and interviewing both current and former department and contractor personnel. According to several accounts, the basic framework of the system was developed during the late 1970s, and was reportedly based on the ability of the disposal site to manage a given waste form. Documented evidence to support this reasoning, however, could not be uncovered.

  12. Using an Innovation Configuration Component Map To Assess the Relationship between Student Achievement and the Degree of Implementation of Extended School Services in a Sample of Kentucky Middle Schools.

    ERIC Educational Resources Information Center

    Craig, James R.; Kacer, Barbara A.

    One of the diagnostic tools used in the evaluation of programs implemented under the Kentucky Education Reform Act (KERA) (1990) is the Innovation Configuration Component (ICC) Map, designed to specify the key elements associated with an innovation and to define what "use" means in the context of implementing an innovation. This study investigated…

  13. Comparative thermal analysis of alternate Cryogenic Fluid Management Experiment (CFME) configurations

    NASA Technical Reports Server (NTRS)

    Merino, F.; Oneill, R. F.

    1980-01-01

    The Cryogenic Fluid Management Experiment (CFME) was analyzed to assess the feasibility and advisability of deleting the vapor cooled shield (VCS) from the baseline CFME insulation and pressure control system. Two alternate concepts of CFME insulation and pressure control, neither of which incorporated the VCS, were investigated. The first concept employed a thermodynamic vent system (TVS) to throttle the flow through an internal wall mounted heat exchanger (HX) within the pressure vessel to decrease boiloff and pressure rise rate, while the second concept utilized a TVS without an internal heat exchanger. Only the first concept was viable. Its performance was assessed for a seven day mission and found to be satisfactory. It was also concluded that VCS development costs would be greater than for an internal HX installation. Based upon the above comparisons, the HX was recommended as a replacement for the VCS.

  14. Digital Library Billing Management System Design and Implementation

    NASA Astrophysics Data System (ADS)

    Nie, Ying

    Based on the database of SQL Server, a new automated billing and management system was designed using a range of forms, menus and control room provided by VB. In this new design, WINDOWS registry and API functions ware used, as well DAO and ADO data access and other advanced means. A good interactive interface was available and users could obtain a fresh and different feeling. Demonstrated by the application, the system provided accurate and reliable function and satisfied the needs of modern managements. The system is suitable for automatic billing of colleges and internet cafes management.

  15. Implementing managed care in an industrial rehabilitation program.

    PubMed

    Niemeyer, L O; Foto, M; Holmes-Enix, D

    1994-01-01

    Managed care, with all its problems and potentials, is entering the scene in workers' compensation as a way to deal with escalating costs. Though the roots of managed care lie in cost containment efforts, its future depends on a shift in emphasis to quality of care. Clinicians must become partners with insurance companies and employers to evolve a "win-win" scenario that combines efficiency with effectiveness or risk both exclusion from provider networks and loss of control over what becomes incorporated into standards of care. Steps that can be taken by clinicians include developing a sense of accountability for final functional outcome, internal utilization management, and an internal case management protocol. PMID:24440843

  16. Nurse and manager perceptions of nurse initiated and managed antiretroviral therapy (NIMART) implementation in South Africa: a qualitative study

    PubMed Central

    Davies, Natasha Elaine Claire Garai; Homfray, Mike; Venables, Emilie Charlotte

    2013-01-01

    Objective To explore nurse and facility and programme manager perceptions of nurse initiated and managed antiretroviral therapy (NIMART) implementation in Gauteng, South Africa. Design In this qualitative study, in-depth interviews and focus group discussions were conducted to gain insight into participants’ experiences of NIMART implementation. Setting Participants came from urban, peri-urban and rural primary healthcare clinics in two Gauteng Province municipalities. Participants 25 nurses and 18 managers who were actively involved in NIMART implementation were purposively sampled. Results The findings from this study reveal that, despite encountering numerous challenges including human resources, training and clinical mentoring and health systems issues, NIMART nurses and managers remained optimistic about their work. Study participants felt empowered by their expanded roles. Increased responsibilities associated with NIMART implementation encouraged better use of creative problem-solving and teamwork to facilitate integration of NIMART into existing clinic services. NIMART nurses perceived antiretroviral therapy (ART) patients to be more insightful about their illness, engaged in their HIV treatment and aware of the importance of adherence which enhanced nurse–patient relationships and increased their sense of job satisfaction. Conclusions Although the implementation of NIMART is complex, when NIMART is implemented well, ART access is increased and patient outcomes are improved. Supportive interventions which address the specific challenges faced by nurses providing NIMART now need to be implemented. Attempts should be made to replicate the positive aspects of NIMART implementation identified by participants as this may improve healthcare providers’ experiences of task-shifting. PMID:24240142

  17. Interval Management: Development and Implementation of an Airborne Spacing Concept

    NASA Technical Reports Server (NTRS)

    Barmore, Bryan E.; Penhallegon, William J.; Weitz, Lesley A.; Bone, Randall S.; Levitt, Ian; Flores Kriegsfeld, Julia A.; Arbuckle, Doug; Johnson, William C.

    2016-01-01

    Interval Management is a suite of ADS-B-enabled applications that allows the air traffic controller to instruct a flight crew to achieve and maintain a desired spacing relative to another aircraft. The flight crew, assisted by automation, manages the speed of their aircraft to deliver more precise inter-aircraft spacing than is otherwise possible, which increases traffic throughput at the same or higher levels of safety. Interval Management has evolved from a long history of research and is now seen as a core NextGen capability. With avionics standards recently published, completion of an Investment Analysis Readiness Decision by the FAA, and multiple flight tests planned, Interval Management will soon be part of everyday use in the National Airspace System. Second generation, Advanced Interval Management capabilities are being planned to provide a wider range of operations and improved performance and benefits. This paper briefly reviews the evolution of Interval Management and describes current development and deployment plans. It also reviews concepts under development as the next generation of applications.

  18. Implementing and Managing Change: A Guide for Assessing Information Technology.

    ERIC Educational Resources Information Center

    Morell, Jonathan A.; And Others

    A framework for assessing the implementation and impact of office automation (OA) technology within shore-based facilities of the U.S. Navy is provided. Following a list of the assumptions guiding the evaluation plan, a model for data collection is presented which is based on the perspective of a work group, i.e., a small number of individuals who…

  19. Unterstützung der IT-Service-Management-Prozesse an der Technischen Universität München durch eine Configuration-Management-Database

    NASA Astrophysics Data System (ADS)

    Knittl, Silvia

    Hochschulprozesse in Lehre und Verwaltung erfordern durch die steigende Integration und IT-Unterstützung ein sogenanntes Business Alignment der IT und damit auch ein professionelleres IT-Service-Management (ITSM). Die IT Infrastructure Library (ITIL) mit ihrer Beschreibung von in der Praxis bewährten Prozessen hat sich zum de-facto Standard im ITSM etabliert. Ein solcher Prozess ist das Konfigurationsmanagement. Es bildet die IT-Infrastruktur als Konfigurationselemente und deren Beziehungen in einem Werkzeug, genannt Configuration Management Database (CMDB), ab und unterstützt so das ITSM. Dieser Bericht beschreibt die Erfahrungen mit der prototypischen Einführung einer CMDB an der Technischen Universität München.

  20. Crisis crowdsourcing framework: designing strategic configurations of crowdsourcing for the emergency management domain

    USGS Publications Warehouse

    Liu, Sophia B.

    2014-01-01

    Crowdsourcing is not a new practice but it is a concept that has gained significant attention during recent disasters. Drawing from previous work in the crisis informatics, disaster sociology, and computer-supported cooperative work (CSCW) literature, the paper first explains recent conceptualizations of crowdsourcing and how crowdsourcing is a way of leveraging disaster convergence. The CSCW concept of “articulation work” is introduced as an interpretive frame for extracting the salient dimensions of “crisis crowdsourcing.” Then, a series of vignettes are presented to illustrate the evolution of crisis crowdsourcing that spontaneously emerged after the 2010 Haiti earthquake and evolved to more established forms of public engagement during crises. The best practices extracted from the vignettes clarified the efforts to formalize crisis crowdsourcing through the development of innovative interfaces designed to support the articulation work needed to facilitate spontaneous volunteer efforts. Extracting these best practices led to the development of a conceptual framework that unpacks the key dimensions of crisis crowdsourcing. The Crisis Crowdsourcing Framework is a systematic, problem-driven approach to determining the why, who, what, when, where, and how aspects of a crowdsourcing system. The framework also draws attention to the social, technological, organizational, and policy (STOP) interfaces that need to be designed to manage the articulation work involved with reducing the complexity of coordinating across these key dimensions. An example of how to apply the framework to design a crowdsourcing system is offered with with a discussion on the implications for applying this framework as well as the limitations of this framework. Innovation is occurring at the social, technological, organizational, and policy interfaces enabling crowdsourcing to be operationalized and integrated into official products and services.

  1. Implementation of Emission Trading in Carbon Dioxide Sequestration Optimization Management

    NASA Astrophysics Data System (ADS)

    Zhang, X.; Duncan, I.

    2013-12-01

    As an effective mid- and long- term solution for large-scale mitigation of industrial CO2 emissions, CO2 capture and sequestration (CCS) has been paid more and more attention in the past decades. A general CCS management system has complex characteristics of multiple emission sources, multiple mitigation technologies, multiple sequestration sites, and multiple project periods. Trade-off exists among numerous environmental, economic, political, and technical factors, leading to varied system features. Sound decision alternatives are thus desired for provide decision supports for decision makers or managers for managing such a CCS system from capture to the final geologic storage phases. Carbon emission trading has been developed as a cost-effective tool for reducing the global greenhouse gas emissions. In this study, a carbon capture and sequestration optimization management model is proposed to address the above issues. The carbon emission trading is integrated into the model, and its impacts on the resulting management decisions are analyzed. A multi-source multi-period case study is provided to justify the applicability of the modeling approach, where uncertainties in modeling parameters are also dealt with.

  2. Barriers to the implementation of self management support in long term lung conditions.

    PubMed

    Roberts, N J; Younis, I; Kidd, L; Partridge, M R

    2012-01-01

    Background Self-management improves outcomes in asthma and COPD and is strongly recommended in national and international guidelines; however implementation of the guidelines such as use of written action plans in practice is often poor. Setting A questionnaire survey was undertaken to identify the healthcare professional barriers to implementation of self-management for asthma and COPD in West London. Question Why is self-management education not being undertaken in respiratory conditions? Methods A questionnaire was designed to elicit healthcare professionals' views about barriers to implementation of self-management in asthma and COPD. Results Response rates were 33% (58/175). Results showed strong support for guideline recommendations, however implementation was patchy. Seventy six percent of respondents discussed asthma self-management with patients; however only 47.8% of patients received a written action plan. For COPD patients, 55.1% discussed self-management, with 41% receiving a written action plan. In COPD, there was greater GP involvement and less delegation of self-management. Barriers to implementation included patient factors (compliance, literacy and patient understanding), time constraints and insufficient resources. Those who believed they had witnessed improved health outcomes with self-management (53%, 31/58) were more likely to give written action plans (78%, 24/31, 'nearly always/sometimes' gave written action plans), Nearly a third of healthcare professionals reported lacking confidence in constructing written action plans (33% 19/58; GPs 43%, nurses 43%). Conclusion Despite overwhelming evidence self-management support is still not being implemented into routine clinical practice, identified barriers included time constraints, lack of training, lack of belief in patients ability to self-manage and lack of confidence completing self-management plans. Practice implications These issues need to be addressed if self-management support is to be

  3. Barriers to the implementation of self management support in long term lung conditions

    PubMed Central

    Roberts, NJ; Younis, I; Kidd, L

    2012-01-01

    Background Self-management improves outcomes in asthma and COPD and is strongly recommended in national and international guidelines; however implementation of the guidelines such as use of written action plans in practice is often poor. Setting A questionnaire survey was undertaken to identify the healthcare professional barriers to implementation of self-management for asthma and COPD in West London. Question Why is self-management education not being undertaken in respiratory conditions? Methods A questionnaire was designed to elicit healthcare professionals' views about barriers to implementation of self-management in asthma and COPD. Results Response rates were 33% (58/175). Results showed strong support for guideline recommendations, however implementation was patchy. Seventy six percent of respondents discussed asthma self-management with patients; however only 47.8% of patients received a written action plan. For COPD patients, 55.1% discussed self-management, with 41% receiving a written action plan. In COPD, there was greater GP involvement and less delegation of self-management. Barriers to implementation included patient factors (compliance, literacy and patient understanding), time constraints and insufficient resources. Those who believed they had witnessed improved health outcomes with self-management (53%, 31/58) were more likely to give written action plans (78%, 24/31, ‘nearly always/sometimes’ gave written action plans), Nearly a third of healthcare professionals reported lacking confidence in constructing written action plans (33% 19/58; GPs 43%, nurses 43%). Conclusion Despite overwhelming evidence self-management support is still not being implemented into routine clinical practice, identified barriers included time constraints, lack of training, lack of belief in patients ability to self-manage and lack of confidence completing self-management plans. Practice implications These issues need to be addressed if self-management support is to

  4. Constraints to Senior Management's Capacity to Implement the Performance Management System in Senior Secondary Schools in Botswana

    ERIC Educational Resources Information Center

    Bulawa, Philip

    2013-01-01

    The performance management system in different forms has been in existence in many countries for some years. In 1999 Botswana like other countries decided to implement a performance management system (PMS) across the entire public service including schools. At its introduction, the government explained the purpose for which this reform was being…

  5. Human Factors Standards and implementation plan for waste management programs

    SciTech Connect

    Banks, W.W.

    1993-04-01

    The Department of Energy (DOE) is dedicated to assuring safety and public confidence by conducting a thorough assessment and upgrade of its nuclear policies and procedures. To ensure that DOE field operations protect the health and safety of employees, the general public and the environment, new operational procedures, standards, and implementation plans are both required and forthcoming from DOE Headquarters, NE-74. Part of this effort requires the establishment and integration of human factors engineering design standards and implementation methods to reduce the probability of human error, human injury and radiological exposure. Human Factors professionals work to assure that technology is designed and utilized safely and efficiently to serve the needs and capabilities of the people who must use this technology. The primary goal of human factors engineering is to ensure compatibility and congruence between the people, equipment, tasks, procedures and training so as to minimize human error and assure that ``total systems performance and reliability`` are achieved.

  6. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  7. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  8. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution...

  9. HEALTH CARE GUIDE TO POLLUTION PREVENTION IMPLEMENTATION THROUGH ENVIRONMENTAL MANAGEMENT SYSTEMS

    EPA Science Inventory

    The Health Care Guide to Pollution Prevention Implementation through Environmental Management Systems provides example EMS procedures and forms used in four ISO 14001 EMS certified hospitals. The latest revisions include more EMS hospital case studies, more compliance resources, ...

  10. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    ERIC Educational Resources Information Center

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  11. Performance Management in UK Universities: Implementing the Balanced Scorecard

    ERIC Educational Resources Information Center

    Taylor, John; Baines, Claire

    2012-01-01

    In recent years, UK universities have become increasingly concerned with performance management. This trend reflects both growing competition and marketisation within higher education, and the increasing requirements for accountability. In response, institutions have begun to explore the application of formal methodologies for performance…

  12. Implementation of Computer Based Management Information Systems: A Behavioral Perspective.

    ERIC Educational Resources Information Center

    Lilly, Edward R.

    In the past decade significant advances have taken place in the development of management information systems (MIS) to support managerial decision making. Recent literature has shown, however, that educators have yet to make full and efficient use of these computer-based systems. A number of authors have discussed factors that may affect…

  13. Implementing Special Education. School Management Handbook Number 4.

    ERIC Educational Resources Information Center

    National Association of Elementary School Principals, Arlington, VA.

    This part of the School Management Handbook provides elementary school administrators with an overview of some of the special education regulations mandated in Public Law 94-142, the Education for All Handicapped Children Act. Section 1 of the document defines screening and evaluation procedures for identifying handicapping conditions of children…

  14. Agricultural drainage water management: Potential impact and implementation strategies

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The unique soil and climate of the Upper Mississippi River Basin (and the Lake Erie Basin) area provide the resources for bountiful agricultural production. Agricultural drainage (both surface and subsurface drainage) is essential for achieving economically viable crop production and management. Dra...

  15. Scope Management: A Core Information System Implementation Project Pedagogy

    ERIC Educational Resources Information Center

    Léger, Pierre-Majorique; Lyle, Derick; Babin, Gilbert; Charland, Patrick; Pellerin, Robert

    2013-01-01

    This article describes an initiative to provide IS management a capstone course that builds on the zone of proximal development concept, oriented towards developing prioritization and critical reasoning skills, and to promote self-learning. Request for proposal business cases appear to offer effective mechanisms for retaining context, while…

  16. National Risk Management Research Laboratory Strategic plan and Implementation - Overview

    EPA Science Inventory

    This publication provides an overview of the strategic plan recently developed by the National Risk Management Research Laboratory (NRMRL). It includes a description of NRMRL's mission and goals and their alignment with Agency goals. Additionally, the overview contains a brief se...

  17. HAMMER COURSEWARE MANAGEMENT SYSTEM (CMS) SYSTEM DEVELOPMENT & IMPLEMENTATION

    SciTech Connect

    GARDNER, P.R.

    2006-04-28

    HAMMER Courseware Management System (HAMMERCMS) is the official name of the system Fluor Hanford, Inc., uses to facilitate development of, deliver, and track training presented in some electronic form (mainly, web-based training) to Hanford Site employees, subcontractors, and vendors.

  18. Implementing Integrated Multicultural Instructional Design in Management Education

    ERIC Educational Resources Information Center

    Schultz, Jennifer L.; Higbee, Jeanne L.

    2011-01-01

    This purpose of this paper is to summarize the principles of integrated multicultural instructional design (IMID; Higbee, Goff, & Schultz, in press; Higbee, Schultz, & Goff, 2010) and present specific strategies for incorporating IMID in management education. The primary goal of IMID is to promote the integration of multicultural content…

  19. The Implementation of Mock Negotiations in Teaching International Business Management.

    ERIC Educational Resources Information Center

    Raffield, Barney T., III

    Mock negotiations are used as part of an undergraduate course in international business management at Lebanon Valley College (Pennsylvania) in order to introduce students to the process of negotiating for advantage in foreign countries and to emphasize the importance of an individual nation's customs, culture, and ways of transacting business in…

  20. Implementing a Compressed Air System Leak Management Program at an Automotive Plant (Visteon's Monroe Plant)

    SciTech Connect

    2001-01-01

    The energy team at Visteon’s Monroe plant, formerly owned by Ford Motor Company, implemented an ongoing compressed air system leak management program. The team developed an approach that combined a traditional “find and fix” effort with an innovative implementation and marketing program. As a result of the leak management program, compressed air system consumption was reduced by more than 50% on a per production unit basis.

  1. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  2. Experience Of Implementing The Integrated Management System In Manufacturing Companies In Slovakia

    NASA Astrophysics Data System (ADS)

    Lestyánszka Škůrková, Katarína; Kučerová, Marta; Fidlerová, Helena

    2015-06-01

    In corporate practice, the term of Integrated Management System means a system the aim of which is to manage an organization regarding the quality, environment, health and safety at work. In the first phase of the VEGA project No. 1/0448/13 "Transformation of ergonomics program into the company management structure through interaction and utilization QMS, EMS, HSMS", we focused on obtaining information about the way or procedure of implementing the integrated management systems in manufacturing companies in Slovakia. The paper considers characteristics of integrated management system, specifies the possibilities for successive integration of the management systems and also describes the essential aspects of the practical implementation of integrated management systems in companies in Slovakia.

  3. School Age Center Connections: Site-Based Management Strategies for Implementation of Quality Programs.

    ERIC Educational Resources Information Center

    Willis, Dahna R.

    This paper describes the outcomes of a practicum that initiated site-based-management strategies to support the consistent implementation of a quality school-age child-care program. Implemented at a multisite child-care center, the program sought to enhance staff members' job satisfaction and maximize their opportunities for professional growth…

  4. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ...EPA is taking final action under section 110 of the Clean Air Act (CAA) to approve a State Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District) portion of the California State Implementation Plan (SIP). This SIP revision incorporates District Rule 1714--Prevention of Significant Deterioration for Greenhouse Gases into the California SIP.......

  5. TQM on Campus: Implementing Total Quality Management in a University Setting.

    ERIC Educational Resources Information Center

    Coate, L. Edwin

    1990-01-01

    Total Quality Management is a system for creating organizationwide participation in planning and implementing a continuous improvement process exceeding customer expectations. It is built on the assumption that 90 percent of problems are a result of process, not employees. Implementation at Oregon State University has nine phases. (MSE)

  6. Implementing an Open Source Learning Management System: A Critical Analysis of Change Strategies

    ERIC Educational Resources Information Center

    Uys, Philip M.

    2010-01-01

    This paper analyses the change and innovation strategies that Charles Sturt University (CSU) used from 2007 to 2009 during the implementation and mainstreaming of an open source learning management system (LMS), Sakai, named locally as "CSU Interact". CSU was in January 2008 the first Australian University to implement an open source learning…

  7. Implementation of an Integrated Information Management System at the National Library of Wales: A Case Study

    ERIC Educational Resources Information Center

    Evans, Manon Foster; Thomas, Sian

    2007-01-01

    Purpose: This paper aims to describe the experiences of the National Library of Wales in implementing an integrated information management system. Design/methodology/approach: Discusses the stages involved in the procurement process, data migration and general system implementation. Findings: Emphasises the need for a well-prepared yet flexible…

  8. Neonatal bilirubin management as an implementation example of interdisciplinary continuum of care tools.

    PubMed

    Thornton, Sidney N; Thompson, Bryce S; Millar, Jean A; Eggert, Larry D; Wilcox, Adam B

    2007-01-01

    Management of newborn bilirubin spans the inpatient and outpatient continuum of care. Intermountain Healthcare has developed and implemented a web-based tool for managing bilirubin that follows newborn patients across care settings and providers with a consistent plan of care. The underlying model for the tool is derived from published guidelines. The model divides the time-sensitive data into risk zones and associates each zone with the appropriate order set for follow-up care. The tool integrates Intermountain's Help2 infrastructure for authoring terms, guidelines, and order sets, with alerts, results, and data entry within the context of the care model. Implementation of the bilirubin management tool is shown to improve communication, ease workflow, and improve guideline compliance. Lessons learned from the implementation include recommendations for handling point-of-care laboratory data and managing archival views, which are insightful to health networks managing longitudinal data. PMID:18693932

  9. An SSM-Based Approach to Implement a Dynamic Performance Management System

    NASA Astrophysics Data System (ADS)

    da Piedade Francisco, Roberto; Azevedo, Américo

    This paper underlines how the use of Soft Systems Methodology (SSM) for an efficient planning, implementation and monitoring of a dynamic performance management system supported by a conceptual scheme that enables a conscious and prepared implementation, can provide instances of performance of a collaborative network, and also promote alignment among the partners. A systematic way to implement it and a review on two practical applications in Brazilian collaborative networks of SMEs are also presented.

  10. Transition management - An analysis of strategic considerations for effective implementation

    NASA Technical Reports Server (NTRS)

    Hunsucker, John L.; Loos, David

    1989-01-01

    Six managerial guidelines are identified for facilitating successful change in an organization. They are: (1) the need for a catalyst to initiate change; (2) the setting of organizational goals which take into account the impact of technical, political, and cultural factors; (3) requiring a transition team to guide the change; (4) a demonstration by top management of a commitment to the change as well as their acting as change agents; (5) the utilization of employee participation and good communication to help overcome employee resistance; and (6) the evaluation of the change program as important to the success of present and future change programs. A description of each guideline is presented, and its importance is examined. Available options are also presented for management to deal with each of the guidelines.

  11. Managing customer satisfaction: New approaches to measurement and implementation

    SciTech Connect

    Haight, J.M.; Leon, G.H.

    1994-11-01

    This paper describes the development of Duke Power`s Customer Satisfaction Manager -- an innovative customer satisfaction measurement system -- from its inception to its application as a planning tool. It provides both market researchers and utility planners with the conceptual foundation for evaluating current satisfaction measurement systems and for moving toward the development of a satisfaction manager system. Importantly, it demonstrates the practical applications of the system and the various uses of the information that it yields by presenting results from customer requirement analyses and simulated service models. The paper concludes with discussions on Duke`s expansions of the approach to incorporate transaction-specific satisfaction measures and long-term satisfaction tracking methods.

  12. Assessing the implementation of performance management of health care workers in Uganda

    PubMed Central

    2013-01-01

    Background The performance management concept is relatively new to the Ugandan health sector. Uganda has been implementing health sector reforms for nearly two decades. The reforms included the introduction of the results-oriented management in the public sector and the decentralisation of the management of health care workers from central to local governments. This study examined the implementation of performance management of health care workers in order to propose strategies for improvement. Methods The study was a descriptive survey carried out in the Kumi, Mbale, Sironko and Tororo districts and utilising mixed research methodology. A self-administered questionnaire was used to collect quantitative data from the health care workers. A semi-structured interview guide was used to collect qualitative data from the health service managers. The sample for the quantitative method was selected using stratified random sampling. Purposive sampling was used to select health service managers. Quantitative data were analysed using Statistical Package for Social Sciences (version 18.0). Qualitative data were categorised according to the themes and analysed manually. Results The findings show that to some extent performance management is implemented in the health sector; however, there were loopholes in its implementation. There were inadequacies in setting performance targets and performance management planning was hardly done. Although many health care workers had job descriptions, the performance indicators and standards were not clearly defined and known to all workers and managers. Additionally the schedules for performance assessments were not always adhered to. There were limited prospects for career progression, inadequate performance feedback and poor rewarding mechanisms. Conclusions Performance management of health care workers is inadequately done in the districts. Performance management is a key component of attempts to improve health sector outcomes. As a

  13. Integrated Disability Management: Implementing a Customized Whole-Person Approach.

    PubMed

    Bruen, Phil

    2016-01-01

    This article describes how incorporating integrated disability management can address business challenges. It includes case studies featuring organizations that used a "whole-person approach" to result in (1) greater and more effective communication and reporting, (2) more satisfied and productive employees and (3) cost savings through quicker return to work when legally and medically appropriate, all in alignment with the particular needs of a given firm. One size most definitely does not fit all. PMID:27491138

  14. Fully Internally Contracted Multireference Configuration Interaction Theory Using Density Matrix Renormalization Group: A Reduced-Scaling Implementation Derived by Computer-Aided Tensor Factorization.

    PubMed

    Saitow, Masaaki; Kurashige, Yuki; Yanai, Takeshi

    2015-11-10

    We present an extended implementation of the multireference configuration interaction (MRCI) method combined with the quantum-chemical density matrix renormalization group (DMRG). In the previous study, we introduced the combined theory, referred to as DMRGMRCI, as a method to calculate high-level dynamic electron correlation on top of the DMRG wave function that accounts for active-space (or strong) correlation using a large number of active orbitals. The DMRG-MRCI method is built on the full internal-contraction scheme for the compact reference treatment and on the cumulant approximation for the treatment of the four-particle rank reduced density matrix (4-RDM). The previous implementation achieved the MRCI calculations with the active space (24e,24o), which are deemed the record largest, whereas the inherent Nact 8 × N complexity of computation was found a hindrance to using further large active space. In this study, an extended optimization of the tensor contractions is developed by explicitly incorporating the rank reduction of the decomposed form of the cumulant-approximated 4-RDM into the factorization. It reduces the computational scaling (to Nact7 × N) as well as the cache-miss penalty associated with direct evaluation of complex cumulant reconstruction. The present scheme, however, faces the increased complexity of factorization patterns for optimally implementing the tensor contraction terms involving the decomposed 4-RDM objects. We address this complexity using the enhanced symbolic manipulation computer program for deriving and coding programmable equations. The new DMRG-MRCI implementation is applied to the determination of the stability of the iron(IV)-oxo porphyrin relative to the iron(V) electronic isomer (electromer) using the active space (29e,29o) (including four second d-shell orbitals of iron) with triple-ζ-quality atomic orbital basis sets. The DMRG-cu(4)-MRCI+Q model is shown to favor the triradicaloid iron(IV)-oxo state as the lowest

  15. Implementing a Case Management Initiative in High-Need Schools

    PubMed Central

    Gifford, Elizabeth J.

    2013-01-01

    States continue to experiment with ways of improving health and human service use by people with complex needs. Such efforts have often sought to increase individual and family control over services as well as to enhance coordination among providers. Paths to achieving these goals are not well understood. This study draws on two previously distinct conceptual frameworks to examine how 71 public schools implemented a team approach to increasing family and agency engagement for children at risk. Results from longitudinal data fit the core components expected to affect implementation and also indicated sustainability, but in ways distinctive to the initiative's public school settings. Accountability to the state appeared to be a major catalyst, yet in some respects also constrained local agencies from participating as intended. School inertia may have both undermined the program through some evaluation practices and gaps in administrative support, and supported integration into organizational routines and successful experimentation over time in increasing caregiver involvement. Family hesitation about sharing information with multiple agencies may also help explain why the goal of seamless coordination remains elusive. PMID:23976809

  16. Operational Dynamic Configuration Analysis

    NASA Technical Reports Server (NTRS)

    Lai, Chok Fung; Zelinski, Shannon

    2010-01-01

    Sectors may combine or split within areas of specialization in response to changing traffic patterns. This method of managing capacity and controller workload could be made more flexible by dynamically modifying sector boundaries. Much work has been done on methods for dynamically creating new sector boundaries [1-5]. Many assessments of dynamic configuration methods assume the current day baseline configuration remains fixed [6-7]. A challenging question is how to select a dynamic configuration baseline to assess potential benefits of proposed dynamic configuration concepts. Bloem used operational sector reconfigurations as a baseline [8]. The main difficulty is that operational reconfiguration data is noisy. Reconfigurations often occur frequently to accommodate staff training or breaks, or to complete a more complicated reconfiguration through a rapid sequence of simpler reconfigurations. Gupta quantified a few aspects of airspace boundary changes from this data [9]. Most of these metrics are unique to sector combining operations and not applicable to more flexible dynamic configuration concepts. To better understand what sort of reconfigurations are acceptable or beneficial, more configuration change metrics should be developed and their distribution in current practice should be computed. This paper proposes a method to select a simple sequence of configurations among operational configurations to serve as a dynamic configuration baseline for future dynamic configuration concept assessments. New configuration change metrics are applied to the operational data to establish current day thresholds for these metrics. These thresholds are then corroborated, refined, or dismissed based on airspace practitioner feedback. The dynamic configuration baseline selection method uses a k-means clustering algorithm to select the sequence of configurations and trigger times from a given day of operational sector combination data. The clustering algorithm selects a simplified

  17. A Solution for Establishing the Information Technology Service Management Processes Implementation Sequence

    NASA Astrophysics Data System (ADS)

    Arcilla, Magdalena; Calvo-Manzano, Jose; Cuevas, Gonzalo; Gómez, Gerzon; Ruiz, Elena; San Feliu, Tomás

    This paper addresses the implementation sequence of Services Management processes defined in ITIL v2, from a topological perspective. Graphs Theory is used to represent the existing dependencies among the ITIL v2 processes, in order to find clusters of strongly connected processes. These clusters will help to determine the implementation priority of the service management processes. For it, OPreSSD (Organizational Procedure for Service Support and Service Delivery) is proposed in order to identify the processes implementation sequence related to the Service Support (SS) and Service Delivery (SD) areas.

  18. Total quality management: Strengths and barriers to implementation and cultural adaptation

    NASA Technical Reports Server (NTRS)

    Siegfeldt, Denise V.; Glenn, Michael; Hamilton, Louise

    1992-01-01

    NASA/Langley Research Center (LaRC) is in the process of implementing Total Quality Management (TQM) throughout the organization in order to improve productivity and make the Center an even better place to work. The purpose of this project was to determine strengths and barriers to TQM being implemented and becoming a part of the organizational culture of the Human Resources Management Division (HRMD) at Langley. The target population for this project was both supervisory and nonsupervisory staff of the HMRD. In order to generate data on strengths and barriers to TQM implementation and cultural adaptation, a modified nominal group technique was used.

  19. Implementation and use of a microcomputer-based management information system to monitor dairy herd performance

    PubMed Central

    Lissemore, Kerry D.; Leslie, Ken E.; Menzies, Paula I.; Martin, S. Wayne; Meek, Alan H.; Etherington, Wayne G.

    1992-01-01

    A microcomputer-based herd management information system was implemented as part of the herd health program provided to 13 dairy clients by the Ontario Veterinary College, University of Guelph. The study was conducted over a two year period. Data were collected from on-farm event diaries, veterinary visit reports, and production testing information. Selected indices of reproduction, udder health, production, and heifer performance were reported. It was concluded that the implementation of a microcomputer-based information management system, operated as a bureau service, was feasible. However, limitations to the implementation in veterinary practice were identified. PMID:17423945

  20. Total quality management: Strengths and barriers to implementation and cultural adaptation

    NASA Astrophysics Data System (ADS)

    Siegfeldt, Denise V.; Glenn, Michael; Hamilton, Louise

    1992-09-01

    NASA/Langley Research Center (LaRC) is in the process of implementing Total Quality Management (TQM) throughout the organization in order to improve productivity and make the Center an even better place to work. The purpose of this project was to determine strengths and barriers to TQM being implemented and becoming a part of the organizational culture of the Human Resources Management Division (HRMD) at Langley. The target population for this project was both supervisory and nonsupervisory staff of the HMRD. In order to generate data on strengths and barriers to TQM implementation and cultural adaptation, a modified nominal group technique was used.

  1. Overcoming constraints to the implementation of water demand management in southern Africa

    NASA Astrophysics Data System (ADS)

    Mwendera, E. J.; Hazelton, D.; Nkhuwa, D.; Robinson, P.; Tjijenda, K.; Chavula, G.

    This paper presents results of a study on water demand management status and overcoming constraints to implementation of water demand management in the southern African region, as part of Phase II of water demand management (WDM) programme implemented by the IUCN (The World Conservation Union). The study was conducted in Malawi, Namibia, South Africa, Swaziland, Zambia and Zimbabwe. The study methodology consisted of a survey of literature, and interviewing and communicating with stakeholders in order to learn from stakeholders on the critical constraints to WDM implementation and strategies to overcome them. The study has shown that, despite the potential savings that would accrue from implementation of WDM, the water sector across the southern African region continues to focus on water supply augmentation. There are inadequate financial and human resources for rehabilitation, operation and maintenance of water conveyance systems resulting in system leaks, which contribute to high levels of unaccounted-for water, a situation that masks the potential benefits of WDM. In most countries, the water sector operates on ad-hoc sub-sector water user objectives, which provided guidelines only for development and management purposes. Most of the institutional frameworks have remained diffuse, resulting into poor performance in the sector, and into crisis management in the water resources development. Though the WDM policy in most countries is already accessible through guidelines for catchment management institutions and water supply institutions; there is a lack of broad commitment to implementing them. In other countries the instruments are relatively new and have not been applied widely. Similarly, the effectiveness of instruments has not been well evaluated in most countries. In countries where policy is weak there is often a lack of clarity as to who is responsible for WDM implementation, and even less clarity on who is responsible for facilitating and monitoring

  2. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  3. Design and Implementation of Training to Improve Management of Pediatric Overweight

    ERIC Educational Resources Information Center

    Beno, Luke; Hinchman, Josephine; Kibbe, Debra; Trowbridge, Frederick

    2005-01-01

    Introduction: Clinicians report a low proficiency in treating overweight children and using behavioral management strategies. This paper documents the design and implementation of a training program to improve clinicians' skills in the assessment and behavioral management of pediatric overweight. Methods: Two one-hour CME trainings were designed…

  4. Implementing a New Cloud Computing Library Management Service: A Symbiotic Approach

    ERIC Educational Resources Information Center

    Dula, Michael; Jacobsen, Lynne; Ferguson, Tyler; Ross, Rob

    2012-01-01

    This article presents the story of how Pepperdine University migrated its library management functions to the cloud using what is now known as OCLC's WorldShare Management Services (WMS). The story of implementing this new service is told from two vantage points: (1) that of the library; and (2) that of the service provider. The authors were the…

  5. Changes in Organizational Climate Associated with Development and Implementation of an Educational Management System.

    ERIC Educational Resources Information Center

    Bonney, Lewis A.

    The development and implementation of a humanistic educational management system in a large urban school district has been associated with demonstrable changes in organizational climate. The management system is humanistic in that teachers and principals select their educational priorities based on student needs and mutually agree with supervisors…

  6. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District portion of the...

  7. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  8. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    SciTech Connect

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  9. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ...EPA is taking direct final action to approve revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC), oxides of nitrogen (NOX), and particulate matter (PM) emissions from residential......

  10. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... TREASURY CONVERSIONS FROM MUTUAL TO STOCK FORM Standard Conversions Post-Conversion § 563b.500. What management stock benefit plans may I implement? (a) During the 12 months after your conversion, you...

  11. Implementation guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511

    SciTech Connect

    McDaniel, L.B.

    1998-04-17

    This report is an Implementation Guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511 to provide a set of uniform instructions for managing the two contractors selected. The primary objective is to produce the necessary deliverables and services for the HTI project within schedule and budget.

  12. Forrest Conservation Area : Management & Implementation FY 2004 Annual Report.

    SciTech Connect

    Smith, Brent

    2008-12-01

    The Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Conservation Area during July of 2002. The property is located in the Upper John Day subbasin within the Columbia basin. The property consists of two parcels comprising 4,232 acres. The Mainstem parcel consists of 3,445 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem John Day River. The Middle Fork parcel consists of 786 acres and is located one mile to the west of the town of Austin, OR on the Middle Fork John Day River. The Forrest Conservation Area is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. Acquisition of the Forrest Conservation Area was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by hydroelectric facilities on the Columbia River and its tributaries. The intent of the Conservation Area is to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, {section}11.1, {section}7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of management funding for the protection and restoration of fish and wildlife habitat through a memorandum of agreement.

  13. Large-scale parallel configuration interaction. II. Two- and four-component double-group general active space implementation with application to BiH

    NASA Astrophysics Data System (ADS)

    Knecht, Stefan; Jensen, Hans Jørgen Aa.; Fleig, Timo

    2010-01-01

    We present a parallel implementation of a large-scale relativistic double-group configuration interaction (CI) program. It is applicable with a large variety of two- and four-component Hamiltonians. The parallel algorithm is based on a distributed data model in combination with a static load balancing scheme. The excellent scalability of our parallelization scheme is demonstrated in large-scale four-component multireference CI (MRCI) benchmark tests on two of the most common computer architectures, and we also discuss hardware-dependent aspects with respect to possible speedup limitations. With the new code we have been able to calculate accurate spectroscopic properties for the ground state and the first excited state of the BiH molecule using extensive basis sets. We focused, in particular, on an accurate description of the splitting of these two states which is caused by spin-orbit coupling. Our largest parallel MRCI calculation thereby comprised an expansion length of 2.7×109 Slater determinants.

  14. Pathology and failure in the design and implementation of adaptive management

    USGS Publications Warehouse

    Allen, Craig R.; Gunderson, Lance H.

    2011-01-01

    The conceptual underpinnings for adaptive management are simple; there will always be inherent uncertainty and unpredictability in the dynamics and behavior of complex ecological systems as a result non-linear interactions among components and emergence, yet management decisions must still be made. The strength of adaptive management is in the recognition and confrontation of such uncertainty. Rather than ignore uncertainty, or use it to preclude management actions, adaptive management can foster resilience and flexibility to cope with an uncertain future, and develop safe to fail management approaches that acknowledge inevitable changes and surprises. Since its initial introduction, adaptive management has been hailed as a solution to endless trial and error approaches to complex natural resource management challenges. However, its implementation has failed more often than not. It does not produce easy answers, and it is appropriate in only a subset of natural resource management problems. Clearly adaptive management has great potential when applied appropriately. Just as clearly adaptive management has seemingly failed to live up to its high expectations. Why? We outline nine pathologies and challenges that can lead to failure in adaptive management programs. We focus on general sources of failures in adaptive management, so that others can avoid these pitfalls in the future. Adaptive management can be a powerful and beneficial tool when applied correctly to appropriate management problems; the challenge is to keep the concept of adaptive management from being hijacked for inappropriate use.

  15. Implementation of a Web-based teleradiology management system.

    PubMed

    Caffery, Liam; Manthey, Ken

    2004-01-01

    Five Queensland hospitals have been equipped with picture archiving and communication systems (PACS). Patient transfers from one facility to another involve transferring images from PACS to PACS. We have developed a Web-based teleradiology management system (TMS) that automates the transfer of images and radiologists' reports, as well as the quality control and housekeeping associated with teleradiology. The TMS was installed at all five hospitals. During a two-month study period, 752 studies were transmitted. All studies and associated radiologists' reports arrived correctly at the destination hospital, together with the notification email for the system administrators. PACS support personnel agreed that the TMS significantly reduced the amount of time they spent on image transfers. Staff at the busiest site estimated that the time they spent on image transfer had decreased from 10 h per week to 1 h per week. PMID:15603599

  16. Aircraft Configuration and Flight Crew Compliance with Procedures While Conducting Flight Deck Based Interval Management (FIM) Operations

    NASA Technical Reports Server (NTRS)

    Shay, Rick; Swieringa, Kurt A.; Baxley, Brian T.

    2012-01-01

    Flight deck based Interval Management (FIM) applications using ADS-B are being developed to improve both the safety and capacity of the National Airspace System (NAS). FIM is expected to improve the safety and efficiency of the NAS by giving pilots the technology and procedures to precisely achieve an interval behind the preceding aircraft by a specific point. Concurrently but independently, Optimized Profile Descents (OPD) are being developed to help reduce fuel consumption and noise, however, the range of speeds available when flying an OPD results in a decrease in the delivery precision of aircraft to the runway. This requires the addition of a spacing buffer between aircraft, reducing system throughput. FIM addresses this problem by providing pilots with speed guidance to achieve a precise interval behind another aircraft, even while flying optimized descents. The Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR) human-in-the-loop experiment employed 24 commercial pilots to explore the use of FIM equipment to conduct spacing operations behind two aircraft arriving to parallel runways, while flying an OPD during high-density operations. This paper describes the impact of variations in pilot operations; in particular configuring the aircraft, their compliance with FIM operating procedures, and their response to changes of the FIM speed. An example of the displayed FIM speeds used incorrectly by a pilot is also discussed. Finally, this paper examines the relationship between achieving airline operational goals for individual aircraft and the need for ATC to deliver aircraft to the runway with greater precision. The results show that aircraft can fly an OPD and conduct FIM operations to dependent parallel runways, enabling operational goals to be achieved efficiently while maintaining system throughput.

  17. Study and implementation of the network management agent of telecommunication application server in NGN

    NASA Astrophysics Data System (ADS)

    Liu, Kun; He, Hui; Ni, Yuhua

    2013-03-01

    The telecommunication application server (AS) is an important part of the value-added service network in the next generation network(NGN) as the support platform. Remote, unified and secure management to a variety of services is implemented after the remote network management of the telecommunications application server. The network management system based on Simple Network Management Protocol (SNMP) is decided to utilized to analyse and study the network managed objects in AS because of the integration of telecommunications networks and computer networks on the network management and convenient, economical and flexible features of SNMP protocol. The network management agent module of AS is designed and an example is illustrated the details of the model. Results indicate the good performance of the network management agent.

  18. Detailed requirements document for Stowage List and Hardware Tracking System (SLAHTS). [computer based information management system in support of space shuttle orbiter stowage configuration

    NASA Technical Reports Server (NTRS)

    Keltner, D. J.

    1975-01-01

    The stowage list and hardware tracking system, a computer based information management system, used in support of the space shuttle orbiter stowage configuration and the Johnson Space Center hardware tracking is described. The input, processing, and output requirements that serve as a baseline for system development are defined.

  19. Teaching Self-Management: The Design and Implementation of Self-Management Tutorials

    ERIC Educational Resources Information Center

    Gerhardt, Megan

    2007-01-01

    Learning the skills of self-management is an essential task for students in the 21st century. A total of 223 undergraduate students participated in 4 self-management tutorials that presented the components of understanding and mastering self-management skills including (a) self-assessment, (b) goal setting, (c) time management, and (d)…

  20. Ethical budgets: a critical success factor in implementing new public management accountability in health care.

    PubMed

    Bosa, Iris M

    2010-05-01

    New public management accountability is increasingly being introduced into health-care systems throughout the world - albeit with mixed success. This paper examines the successful introduction of new management accounting systems among general practitioners (GPs) as an aspect of reform in the Italian health-care system. In particular, the study examines the critical role played by the novel concept of an 'ethical budget' in engaging the willing cooperation of the medical profession in implementing change. Utilizing a qualitative research design, with in-depth interviews with GPs, hospital doctors and managers, along with archival analysis, the present study finds that management accounting can be successfully implemented among medical professionals provided there is alignment between the management imperative and the ethical framework in which doctors practise their profession. The concept of an 'ethical budget' has been shown to be an innovative and effective tool in achieving this alignment. PMID:20424275

  1. Adaptive management of river flows in Europe: A transferable framework for implementation

    NASA Astrophysics Data System (ADS)

    Summers, M. F.; Holman, I. P.; Grabowski, R. C.

    2015-12-01

    The evidence base for defining flow regimes to support healthy river ecosystems is weak, as there are few studies which quantify the ecological impact associated with different degrees of hydrological alteration. As a result, river flow standards used to manage water abstraction are largely based on expert judgement. Planned adaptive management studies on multiple rivers under the European Water Framework Directive represent an opportunity to learn about ecological flow requirements and improve the quantitative evidence base. However, identifying clear ecological responses to flow alteration can be a significant challenge, because of the complexity of river systems and the other factors which may confound the response. This paper describes the Adaptive River Management (ARM) framework, a flexible framework for implementing adaptive management of river flows that is transferable to other regions of the world. Application of the framework will ensure that the effectiveness of implemented management actions is appraised and that transferable quantitative data are collected that can be used in other geographical regions.

  2. Forrest Ranch Management and Implementation, Annual Report 2002-2003.

    SciTech Connect

    Smith, Brent

    2004-01-01

    Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The

  3. Middle Managers' Experiences and Role in Implementing an Interactive Tailored Patient Assessment eHealth Intervention in Clinical Practice.

    PubMed

    Varsi, Cecilie; Ekstedt, Mirjam; Gammon, Deede; Børøsund, Elin; Ruland, Cornelia M

    2015-06-01

    The role of nurse and physician managers is considered crucial for implementing eHealth interventions in clinical practice, but few studies have explored this. The aim of the current study was to examine the perceptions of nurse and physician managers regarding facilitators, barriers, management role, responsibility, and action taken in the implementation of an eHealth intervention called Choice into clinical practice. Individual qualitative interviews were conducted with six nurses and three physicians in management positions at five hospital units. The findings revealed that nurse managers reported conscientiously supporting the implementation, but workloads prevented them from participating in the process as closely as they wanted. Physician managers reported less contribution. The implementation process was influenced by facilitating factors such as perceptions of benefits from Choice and use of implementation strategies, along with barriers such as physician resistance, contextual factors and difficulties for front-line providers in learning a new way of communicating with the patients. The findings suggest that role descriptions for both nurse and physician managers should include implementation knowledge and implementation skills. Managers could benefit from an implementation toolkit. Implementation management should be included in management education for healthcare managers to prepare them for the constant need for implementation and improvement in clinical practice. PMID:25988851

  4. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  5. Hardware and software configuration control - History and current status

    NASA Astrophysics Data System (ADS)

    Berlack, H. R.

    1982-11-01

    Attention is given to the activity and maturation of the design process from 1953 to the present time. During the period of 1953 to mid-1962, the prevailing design control document was the Air Force Navy Aeronautical (ANA) Bulletin 390 and 319A, Engineering Changes, Deviations and Waivers. In June of 1962, the first definitive requirements for configuration control were published by the U.S. Air Force as AFSCM/AFLCM 375-1, titled 'Configuration Management'. In July of 1968, DOD Directive 5010.19, Configuration Management, was issued, followed by DOD Instruction 5010.21, Configuration Management Implementation Guidance. The issuance of DOD Directive 5000.29 - Management of Computer Resources in Major Defense Systems, in April 1976, was DOD's official recognition of the emerging software requirements. Attention is given to the current status, taking into account documents, standards, and specifications which prevail today.

  6. Organizational Factors that Affect the Implementation of Information Technology: Perspectives of Middle Managers in Iran

    PubMed Central

    Barzekar, Hosein; Karami, Mahtab

    2014-01-01

    ABSTRACT Objective: to examine the organizational factors affecting the application of information technology in hospitals. Since the organizational factors are one of the most important determinants of successful projects, by understanding their impact and identifying them it can help planning a systematic IT implementation. Methods: In this cross-sectional descriptive study 110 middle managers were chosen from teaching hospitals. Structured questionnaire was used for the data collection. Results: There was a significant relationship between organization resource, organizational knowledge, process, management structure and values and goals with implementation of information technology. Conclusion: Findings showed that organizational factors had a considerable impact on implementation of information technology. Top managers must consider the important aspects of effective organizational factors. PMID:25568582

  7. Institutional pressures, dynamic capabilities and environmental management systems: investigating the ISO 9000--environmental management system implementation linkage.

    PubMed

    Zhu, Qinghua; Cordeiro, James; Sarkis, Joseph

    2013-01-15

    We hypothesize a model where domestic and international institutional pressures lead to the successful implementation of ISO 9000 and can in turn lead to the successful implementation of environmental management systems such as ISO 14001 environmental certification systems or total quality environmental management (TQEM) systems. Using appropriate tests for mediation with dichotomous mediators and outcomes, we find that the model holds for a sample of 377 Chinese manufacturers in six major industrial groups in Suzhou, Dalian, and Tianjin. Our findings are consistent with the theory linking internal capabilities to heterogeneous external (in this case, institutional) pressures on organizations for environmentally proactive efforts. Our findings suggest that institutions in developing countries with significant environmental concerns such as China as well as foreign suppliers and partners to firms in these countries should encourage and support ISO 9000 implementations by local firms. These findings may influence other developing nations' adoption of quality and environmental process systems. PMID:23127965

  8. Using structured decision making to help implement a precautionary approach to endangered species management.

    PubMed

    Gregory, Robin; Long, Graham

    2009-04-01

    Endangered species protection is a significant risk management concern throughout North America. An extensive conceptual literature emphasizes the role to be played by precautionary approaches. Risk managers, typically working in concert with concerned stakeholders, frequently cite the concept as key to their efforts to prevent extinctions. Little has been done, however, to evaluate the multidimensional impacts of precautionary frameworks or to assist in the examination of competing precautionary risk management options as part of an applied risk management decision framework. In this article we describe how decision-aiding techniques can assist in the creation and analysis of alternative precautionary strategies, using the example of a multistakeholder committee charged with protection of endangered Cultus Lake salmon on the Canadian west coast. Although managers were required to adopt a precautionary approach, little attention had been given to how quantitative analyses could be used to help define the concept or to how a precautionary approach might be implemented in the face of difficult economic, social, and biological tradeoffs. We briefly review key steps in a structured decision-making (SDM) process and discuss how this approach was implemented to help bound the management problem, define objectives and performance measures, develop management alternatives, and evaluate their consequences. We highlight the role of strategy tables, employed to help participants identify, alternative management options. We close by noting areas of agreement and disagreement among participants and discuss the implications of decision-focused processes for other precautionary resource management efforts. PMID:19144073

  9. Best practices of total quality management implementation in health care settings.

    PubMed

    Talib, Faisal; Rahman, Zillur; Azam, Mohammed

    2011-01-01

    Due to the growing prominence of total quality management (TQM) in health care, the present study was conducted to identify the set of TQM practices for its successful implementation in healthcare institutions through a systematic review of literature. A research strategy was performed on the selected papers published between 1995 and 2009. An appropriate database was chosen and 15 peer-reviewed research papers were identified through a screening process and were finally reviewed for this study. Eight supporting TQM practices, such as top-management commitment, teamwork and participation, process management, customer focus and satisfaction, resource management, organization behavior and culture, continuous improvement, and training and education were identified as best practices for TQM implementation in any health care setting. The article concludes with a set of recommendations for the future researchers to discuss, develop, and work upon in order to achieve better precision and generalizations. PMID:21815741

  10. Experience in implementing a quality management system in a tuberculosis laboratory, Kisumu, Kenya.

    PubMed

    Musau, S; McCarthy, K; Okumu, A; Shinnick, T; Wandiga, S; Williamson, J; Cain, K

    2015-06-01

    We implemented a quality management system (QMS) and documented our improvements in a tuberculosis (TB) laboratory in Kisumu, Kenya. After implementation of the QMS, a sustained reduction in culture contamination rates for solid (from 15.4% to 5.3%) and liquid media (from 15.2% to 9.3%) was observed, and waste from product expiry was reduced significantly. External quality assurance (EQA) results were satisfactory before and after QMS implementation, and a client survey after implementation revealed 98% satisfaction. The laboratory attained ISO 15189 accreditation in October 2013. The implementation of QMS facilitated the attainment of target quality indicators, reduced waste due to expiry and led to high client satisfaction. PMID:25946361

  11. Aeropropulsion facilities configuration control: Procedures manual

    NASA Technical Reports Server (NTRS)

    Lavelle, James J.

    1990-01-01

    Lewis Research Center senior management directed that the aeropropulsion facilities be put under configuration control. A Configuration Management (CM) program was established by the Facilities Management Branch of the Aeropropulsion Facilities and Experiments Division. Under the CM program, a support service contractor was engaged to staff and implement the program. The Aeronautics Directorate has over 30 facilities at Lewis of various sizes and complexities. Under the program, a Facility Baseline List (FBL) was established for each facility, listing which systems and their documents were to be placed under configuration control. A Change Control System (CCS) was established requiring that any proposed changes to FBL systems or their documents were to be processed as per the CCS. Limited access control of the FBL master drawings was implemented and an audit system established to ensure all facility changes are properly processed. This procedures manual sets forth the policy and responsibilities to ensure all key documents constituting a facilities configuration are kept current, modified as needed, and verified to reflect any proposed change. This is the essence of the CM program.

  12. Implementing an integrated standards-based management system to ensure compliance at Los Alamos National Laboratory

    SciTech Connect

    Hjeresen, D.; Roybal, S.; Bertino, P.; Gherman, C.; Hosteny, B.

    1995-03-01

    Los Alamos National Laboratory (LANL or the Laboratory) is developing and implementing a comprehensive, Integrated Standards-Based Management System (ISBMS) to enhance environmental, safety, and health (ESH) compliance efforts and streamline management of ESH throughout the Laboratory. The Laboratory recognizes that to be competitive in today`s business environment and attractive to potential Partnerships, Laboratory operations must be efficient and cost-effective. The Laboratory also realizes potential growth opportunities for developing ESH as a strength in providing new or improved services to its customers. Overall, the Laboratory desires to establish and build upon an ESH management system which ensures continuous improvement in protecting public health and safety and the environment and which fosters a working relationship with stakeholders. A team of process experts from the LANL Environmental Management (EM) Program Office, worked with management system consultants, and the Department of Energy (DOE) to develop an ESH management systems process to compare current LANL ESH management Systems and programs against leading industry standards. The process enabled the Laboratory to gauge its performance in each of the following areas: Planning and Policy Setting; Systems and Procedures; Implementation and Education; and Monitoring and Reporting. The information gathered on ESH management systems enabled LANL to pinpoint and prioritize opportunities for improvement in the provision of ESH services throughout the Laboratory and ultimately overall ESH compliance.

  13. Disseminating contingency management: impacts of staff training and implementation at an opiate treatment program.

    PubMed

    Hartzler, Bryan; Jackson, T Ron; Jones, Brinn E; Beadnell, Blair; Calsyn, Donald A

    2014-04-01

    Guided by a comprehensive implementation model, this study examined training/implementation processes for a tailored contingency management (CM) intervention instituted at a Clinical Trials Network-affiliate opioid treatment program (OTP). Staff-level training outcomes (intervention delivery skill, knowledge, and adoption readiness) were assessed before and after a 16-hour training, and again following a 90-day trial implementation period. Management-level implementation outcomes (intervention cost, feasibility, and sustainability) were assessed at study conclusion in a qualitative interview with OTP management. Intervention effectiveness was also assessed via independent chart review of trial CM implementation vs. a historical control period. Results included: 1) robust, durable increases in delivery skill, knowledge, and adoption readiness among trained staff; 2) positive managerial perspectives of intervention cost, feasibility, and sustainability; and 3) significant clinical impacts on targeted patient indices. Collective results offer support for the study's collaborative intervention design and the applied, skills-based focus of staff training processes. Implications for CM dissemination are discussed. PMID:24462242

  14. Disseminating contingency management: Impacts of staff training and implementation at an opiate treatment program

    PubMed Central

    Hartzler, Bryan; Jackson, T. Ron; Jones, Brinn E.; Beadnell, Blair; Calsyn, Donald A.

    2014-01-01

    Guided by a comprehensive implementation model, this study examined training/implementation processes for a tailored contingency management (CM) intervention instituted at a Clinical Trials Network-affiliate opioid treatment program (OTP). Staff-level training outcomes (intervention delivery skill, knowledge, and adoption readiness) were assessed before and after a 16-hour training, and again following a 90-day trial implementation period. Management-level implementation outcomes (intervention cost, feasibility, and sustainability) were assessed at study conclusion in a qualitative interview with OTP management. Intervention effectiveness was also assessed via independent chart review of trial CM implementation vs. a historical control period. Results included: 1) robust, durable increases in delivery skill, knowledge, and adoption readiness among trained staff; 2) positive managerial perspectives of intervention cost, feasibility, and sustainability; and 3) significant clinical impacts on targeted patient indices. Collective results offer support for the study’s collaborative intervention design and the applied, skills-based focus of staff training processes. Implications for CM dissemination are discussed. PMID:24462242

  15. Communication Channels as Implementation Determinants of Performance Management Framework in Kenya

    ERIC Educational Resources Information Center

    Sang, Jane

    2016-01-01

    The purpose of this study to assess communication channels as implementation determinants of performance management framework In Kenya at Moi Teaching and Referral Hospital (MTRH). The communication theory was used to inform the study. This study adopted an explanatory design. The target sampled 510 respondents through simple random and stratified…

  16. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ...EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan (SIP). These revisions concern oxides of nitrogen (NOX) and oxides of sulfur (SOX) emissions from facilities emitting 4 tons or more per year of NOX or SOX in the year 1990 or any subsequent year under......

  17. A Model of Evaluation Planning, Implementation and Management toward a "Culture of Information" within Organizations.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    The argument underlying the ongoing paradigm shift from logical-positivism to constructionism is briefly outlined. A model of evaluation planning, implementation, and management (the P-I-M model) is then presented, which assumes a complementarity between the two paradigms. The P-I-M Model includes three components of educational evaluation: a…

  18. Design and implementation of dEDBMS: a distributed engineering database management system

    NASA Astrophysics Data System (ADS)

    Wang, Tao; Lin, Zongkai; Guo, Yuzhai

    1996-03-01

    dEDBMS is a practical distributed engineering database management system in the CAD application fields. This paper systematically introduces its system architecture, data distribution, security mechanism and concurrency control strategy etc., especially discusses in more detail the concept and implementation of the two categories and three kinds of `lock' mechanism which is presented by the authors.

  19. From sacred cows to sacrificial lambs: implementing agricultural phosphorus science and management to combat eutrophication

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Experience with implementing agricultural phosphorus (P) strategies highlights successes and uncertainty over outcomes. We examine case studies from the USA, UK, and Sweden to examine P management under voluntary, litigated and regulatory settings. In the USA, voluntary strategies to curtail P loadi...

  20. Implementation of a UNIX-Based Network Management System for English Instruction.

    ERIC Educational Resources Information Center

    Schmitt, Lothar M.; Christianson, Kiel T.

    Pedagogical features and implementation of a UNIX-based management system (UNIEM) designed to support the instructor in teaching English as a second language using a network of workstations are described. The application discussed here is for teaching English composition to students at the University of Aizu (Japan). UNIEM is constructed to assist…

  1. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ...EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from Architectural Coatings. We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking......

  2. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ...EPA is taking direct final action to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns volatile organic compounds (VOC) from organic liquid storage. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the...

  3. Statewide Adoption and Initial Implementation of Contingency Management for Substance-Abusing Adolescents

    ERIC Educational Resources Information Center

    Henggeler, Scott W.; Chapman, Jason E.; Rowland, Melisa D.; Halliday-Boykins, Colleen A.; Randall, Jeff; Shackelford, Jennifer; Schoenwald, Sonja K.

    2008-01-01

    Four hundred thirty-two public sector therapists attended a workshop in contingency management (CM) and were interviewed monthly for the following 6 months to assess their adoption and initial implementation of CM to treat substance-abusing adolescent clients. Results showed that 58% (n = 131) of the practitioners with at least one…

  4. Improving Instructional Efficiency Through the Implementation of Computerized Management and Prescriptive Analysis.

    ERIC Educational Resources Information Center

    Pisano, Thomas N.

    A computerized management system to improve efficiency was implemented for one year in a fifth grade classroom in a large metropolitan city in the southwest. A variety of computer application software packages were reviewed and selections were made for use in grading and prescriptive analysis. The teacher also developed a database of student…

  5. Hazardous Materials Management Technology Programs. National Voluntary Skills Standard. Implementation Guide.

    ERIC Educational Resources Information Center

    Center for Occupational Research and Development, Inc., Waco, TX.

    This implementation guide is intended to help educators use the Skills Standard for Hazardous Materials Management Technology (HMMT). It begins with a description of HMMT and a summary of the 13 job functions of the standard. Within each job function are supporting skills and knowledge that an HMMT worker must possess to be able to accomplish the…

  6. 78 FR 37676 - Federal Acquisition Regulation; System for Award Management Name Change, Phase 1 Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... (ORCA), and Excluded Parties List System (EPLS) databases into the System for Award Management (SAM) database. DATES: Effective Date: July 22, 2013. FOR FURTHER INFORMATION CONTACT: Mr. Curtis E. Glover, Sr... database. Upon implementation, the pre- existing applications were retired, and all requirements for...

  7. 76 FR 29182 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ...EPA is proposing to approve revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) source categories for the MDAQMD. We are proposing to approve these negative declarations under the Clean Air Act as amended in 1990 (CAA or the...

  8. Implementation of Systems to Support the Management of Research: Commentary from a UK University Perspective

    ERIC Educational Resources Information Center

    Rutherford, Scott; Langley, David

    2007-01-01

    The increasing complexity and diversity of a typical portfolio of research awards coupled with advancing technology makes successful implementation and delivery of system benefits more challenging than ever. Moreover, the role of systems in knowledge management is a fundamental issue faced by all research active organizations. One of the principal…

  9. Implementation Planning and Progress on Physical Activity Goals: The Mediating Role of Life-Management Strategies

    ERIC Educational Resources Information Center

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-01-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular, the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects.…

  10. A Bachelor of Engineering Technology Curriculum in Water Quality Management: Program Implementation.

    ERIC Educational Resources Information Center

    Cole, Charles A.; And Others

    Contained are summaries of support courses for a Bachelor of Engineering Technology (BET) Curriculum in Water Quality Management. Suggested courses in this volume include: math, physics, English, drafting, mechanics, civil engineering, and economics. Also included are self-appraisal suggestions for institutions considering implementation of this…

  11. Community Education as a Model for Site-Based Management Implementation.

    ERIC Educational Resources Information Center

    Tomberlin, Christine Murphy

    This paper attempts to interest principals considering site-based management to examine community education as a model for their implementation efforts. The paper first examines the evolution of the community education movement, focusing on major directions and levels of maturity. Next, the unchanging principles of community education…

  12. Enforced Cultural Change in Academe. A Practical Case Study: Implementing Management Systems in Higher Education.

    ERIC Educational Resources Information Center

    Spencer-Matthews, Sarah

    2001-01-01

    An action research project sought to implement a quality management system in an academic department in an Australian higher education institution. The case study revealed that technical change was attained, but adoption of a quality culture achieved only token acceptance. (EV)

  13. Total Quality Management in the Community College: Concept, Application, Implementation--Lessons Learned.

    ERIC Educational Resources Information Center

    Coady, Sharon; And Others

    Based on the work of the National Alliance of Community and Technical Colleges and the Center on Education and Training for Employment, this document addresses the subject of Total Quality Management (TQM) in the community and technical college by examining the concept, application, and implementation of TQM and the lessons learned. First, "The…

  14. Activity-Based Management System Implementation in Higher Education Institution: Benefits and Challenges

    ERIC Educational Resources Information Center

    Ismail, Noor Azizi

    2010-01-01

    Purpose: The purpose of this paper is to discuss how activity-based costing (ABC) technique can be applied in the context of higher education institutions. It also discusses the obstacles and challenges to the successful implementation of activity-based management (ABM) in the higher education environment. Design/methodology/approach: This paper…

  15. SAN JUAN BAY ESTUARY PROGRAM COMPREHENSIVE CONSERVATION AND MANAGEMENT PLAN IMPLEMENTATION TRACKING REPORT, 2004

    EPA Science Inventory

    Four years after the approval of its Comprehensive Conservation and Management Plan (CCMP), the San Juan Bay Estuary Program (SJBEP) is working towards the implementation stage of its 49 actions. During the last three years the program has focused its efforts in developing a coll...

  16. Importance of the Primary Radioactivity Standard Laboratory and Implementation of its Quality Management

    SciTech Connect

    Sahagia, Maria; Razdolescu, Anamaria Cristina; Luca, Aurelian; Ivan, Constantin

    2007-04-23

    The paper presents some specific aspects of the implementation of the quality management in the Radionuclide Metrology Laboratory, from IFIN-HH, the owner of the primary Romanian standard in radioactivity. The description of the accreditation, according to the EN ISO/IEC 17025:2005, is presented.

  17. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) and oxides of sulfur source categories for the AVAQMD and......

  18. Dentist-Implemented Contingent Escape for Management of Disruptive Child Behavior.

    ERIC Educational Resources Information Center

    Allen, Keith D.; And Others

    1992-01-01

    This paper describes a dentist-implemented intervention in which brief escape from dental treatment (contingent on brief periods of cooperative behavior) was provided to manage disruptive child behavior during restorative dental treatment with four children, aged three to seven years. The procedure required no more time than traditional management…

  19. Towards a Conceptual Model of the Implementation of Management and Planning Systems in Schools.

    ERIC Educational Resources Information Center

    Levine, Donald M.

    This paper considers conceptual alternatives for the development of information systems for management and planning in schools. Four problem areas which have been encountered in the introduction and implementation of such systems are identified, including lack of information, lack of understanding, lack of tools for the redress of problems, and…

  20. 77 FR 472 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... Forest Service National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule; Correction AGENCY: USDA Forest Service. ACTION: Notice; correction. SUMMARY: The... FR doc. 2011- 33535, on page 81911, in the first column, correct the ``Dates'' caption to...

  1. Implementing a Quality Management Framework in a Higher Education Organisation: A Case Study

    ERIC Educational Resources Information Center

    O'Mahony, Kim; Garavan, Thomas N.

    2012-01-01

    Purpose: This paper aims to report and analyse the lessons learned from a case study on the implementation of a quality management system within an IT Division in a higher education (HE) organisation. Design/methodology/approach: The paper is based on a review of the relevant literatures and the use of primary sources such as document analysis,…

  2. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ...EPA is finalizing disapproval of a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on September 8, 2009 and concerns volatile organic compound (VOC) emissions from polymeric foam manufacturing operations. Under authority of the Clean Air Act as amended in 1990 (CAA......

  3. The Development and Implementation of a Diversity Management Curriculum: Organizational Change through Exploration and Exploitation

    ERIC Educational Resources Information Center

    Danowitz, Mary Ann; Hanappi-Egger, Edeltraud; Hofmann, Roswitha

    2009-01-01

    Purpose: The purpose of this paper is to provide concepts and strategies to successfully introduce and implement curricular change; especially, related to incorporating diversity management into academic programs. Design/methodology/approach: Utilizing documents and accounts from two agents involved in the change process and an outside observer,…

  4. Asthma Management in Educational Settings: Implementing Guideline-Based Care in Washington State Schools.

    PubMed

    Evans-Agnew, Robin A; Klein, Nicole; Lecce, Sally

    2015-11-01

    Managing asthma in the schools is complex and requires careful planning. This article highlights key steps in implementing guideline-based care for children with asthma in Washington State schools: assessing students, establishing acuity, communicating with parents, and training staff. Advance planning can improve outcomes for students, parents, and school staff in managing this complex and prevalent disease. NASN recently developed asthma management guidelines. Developing state-specific guidelines provides an opportunity to speak specifically to state laws and nurse practice acts while also reinforcing the importance of specialized practice to school nurses, school administrators and teachers, parents, and students. PMID:26515566

  5. Aiding the environment: the Australian Development Agency's experience of implementing an environmental management system

    SciTech Connect

    Keen, Meg . E-mail: meg.keen@anu.edu.au; Sullivan, Marjorie

    2005-08-15

    Aid agencies, like commercial businesses, are increasingly concerned with incorporating sound environmental management into their operations. Different approaches are being used to integrate sustainability into development assistance to ensure that environmental impacts are assessed and managed. One approach being used by AusAID, the Australian aid agency, is to implement an environmental management system (EMS) across program and project areas. This paper examines how AusAID has adapted the EMS approach to suit aid agency operations, and some of the lessons from the Australian experience.

  6. A Collaborative Knowledge Management Process for Implementing Healthcare Enterprise Information Systems

    NASA Astrophysics Data System (ADS)

    Cheng, Po-Hsun; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei

    This paper illustrates a feasible health informatics domain knowledge management process which helps gather useful technology information and reduce many knowledge misunderstandings among engineers who have participated in the IBM mainframe rightsizing project at National Taiwan University (NTU) Hospital. We design an asynchronously sharing mechanism to facilitate the knowledge transfer and our health informatics domain knowledge management process can be used to publish and retrieve documents dynamically. It effectively creates an acceptable discussion environment and even lessens the traditional meeting burden among development engineers. An overall description on the current software development status is presented. Then, the knowledge management implementation of health information systems is proposed.

  7. Design and Implementation of Network Management System Based on Mixed-mode

    NASA Astrophysics Data System (ADS)

    Wei, Xianmin

    With the growth of network scale size, structure is getting more and more sophisticated, how to effectively manage the network has been increasingly paid attention to. Development of network management systems, there are mainly two system models, that is, C/S mode and B/S mode. This paper focuses on analysis of advantages and disadvantages in the C/S mode and B/S mode, design and implementation network management system based on the mixed mode with C/S mode and B/S mode.

  8. PS2-13: Implementing a Lean Management System in Primary Care: Facilitators and Barriers from the Frontlines

    PubMed Central

    Hung, Dorothy; Gray, Caroline; Anderson, Katie; Hereford, James

    2013-01-01

    Background/Aims As approximately $750 billion is wasted in the U.S. health system each year, equivalent to roughly one-third of every medical dollar, “Lean” thinking and techniques offer promising solutions for maximizing value in health care. This study examines a large, multispecialty practice’s journey of implementing a Lean management system beginning in primary care. We sought to understand initial drivers and barriers to implementation, with lessons contributing to a learning system of improvement in health care. Methods This case study was based on in-depth interviews with 16 physician and administrative leaders, and 4 focus groups of medical assistants and administrative staff. Transcripts were coded and analyzed using inductive, grounded methodology. Results Respondents’ insights were clustered around three main themes: organizational leadership, professional values/culture, and availability of resources. Informants described organizational characteristics critical to implementing Lean and to which they attributed its success so far, including: strong leadership and the importance that leaders embody qualities they are espousing, willingness to engage all levels of staff in the change process, and willingness to adjust performance measures according to new job roles. However, many noted that values and norms surrounding clinical practice are often at odds with the Lean principle of standardizing work to eliminate waste, representing the biggest challenge for physicians who are socialized into a culture where independent thinking and autonomy is valued. The availability of resources was also cited as an important factor in executing changes, including time to do one’s regular work while implementing change, time to absorb new ideas and changes, and proper space configurations to support the change. Conclusions Lean represents a non-traditional approach to managing the delivery of medical care. In a Lean operating system, value is seen first from

  9. Implementing regional sediment management to sustain navigation at an energetic tidal inlet

    USGS Publications Warehouse

    Moritz, H.R.; Gelfenbaum, G.R.; Kaminsky, G.M.; Ruggiero, P.; Oltman-shay, J.; Mckillip, D.J.

    2007-01-01

    Regional Sediment Management (RSM) is a systems-based approach for managing multiple projects involving sediment. RSM fosters balance between infrastructure and natural system processes, resulting in reduced project costs and achievement of greater benefits. This paper introduces the RSM concept and describes how RSM is being implemented at the Mouth of the Columbia River to sustain the inlet's 100-year old navigation infrastructure and adjacent shore lands. Implementing RSM at this energetic inlet involves feeding the inlet's morphology using dredged material, and letting nature do the work of dispersing the placed dredged material to supplement the inlet's sediment budget, without compromising the reliability of the navigation channel. The paper discusses the types of data that are being collected and analyzed to understand the environmental forcing affecting the inlet's morphology. The paper also addresses how dredged material disposal is being conducted to implement RSM.

  10. Modeling the leadership attributes of top management in green innovation implementation

    NASA Astrophysics Data System (ADS)

    Ishak, Noormaizatul Akmar; Ramli, Mohammad Fadzli

    2015-05-01

    The implementation of green innovation in the companies is the interest of the governments all over the world. This has been the main focus of the Copenhagen Protocol and Kyoto Protocol that require all governments to preserve the nature through green initiatives. This paper proposes a mathematical model on the leadership attributes of the top management in ensuring green innovation implementation in their companies' strategies to reduce operational cost. With green innovation implementation in the Government-Linked Companies (GLCs), we identify the leadership attributes are tied up to the leadership style of the top managers in the companies. Through this model we have proved that green type leadership always contributes better in cost saving, therefore it is a more efficient leadership attribute for the GLCs especially.

  11. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    SciTech Connect

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  12. Modeling and implementing feed management decisions into whole farm nutrient management

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Feed management plays a major role in whole farm nutrient management. On most dairy farms, imported feed contributes more than 50% of the nutrients entering the farm. Export of nutrients from the farm in milk approximates 30% or less of the nitrogen and phosphorus consumed by the herd. Whole farm nu...

  13. Development and Implementation of Critical Loads for Atmospheric Deposition: Federal Land Management Implications

    NASA Astrophysics Data System (ADS)

    Porter, E. M.

    2004-12-01

    Critical loads for atmospheric deposition have been widely developed and used in Europe, Canada, and other countries. Critical loads are used to influence air pollution emissions reductions, thereby protecting and restoring aquatic and terrestrial ecosystems. In the United States, federal land management agencies are adopting the critical load concept as a potentially valuable resource management tool. Certain parks and wilderness areas are currently being affected by anthropogenic nitrogen and sulfur deposition. Effects of excess deposition include acidification, nitrogen enrichment, toxicity, and changes in biotic communities. Streams in both Shenandoah and Great Smoky Mountains National Parks are experiencing chronic and episodic acidification and brook trout fisheries in Shenandoah have been affected. High elevation ecosystems in Rocky Mountain National Park are undergoing subtle changes in aquatic and terrestrial ecosystems attributable to atmospheric deposition. Natural resources in many other federal areas have been affected or are at risk from deposition. Federal land managers are refining strategies for critical loads that include working with scientists to identify resources sensitive to deposition, defining resource protection criteria that will meet management objectives, and estimating and implementing critical loads. Critical loads will be used in resource management decisions and federal land management planning. They will be used to evaluate management actions and assess progress towards meeting management goals. Federal land managers will also communicate critical loads information to air pollution regulatory agencies to inform emissions management strategies for clean air.

  14. The Vortex: a universal 'high-acuity implementation tool' for emergency airway management.

    PubMed

    Chrimes, N

    2016-09-01

    Factors influencing performance during emergency airway management can be broadly divided into issues with preparation and those with implementation. Effective design of resources that provide guidance on management requires consideration of the context in which they are to be used. Many of the major airway guidelines do not specify whether they are intended to be used during preparation or implementation and may not take the context for use into account in their design. This can produce tools which may be not only ineffective but actively disruptive to team function in an emergency. The Vortex is a novel, simple, and predominantly visually based cognitive aid, which has been specifically designed to be used in real time during airway emergencies to support team function and target recognized failings in airway crisis management. Unlike the major algorithms, which are context specific, the Vortex is flexible enough for the same tool to be applied to any circumstance in which airway management takes place, independent of context, patient type, or the intended airway device. This makes the same tool suitable for use by emergency physicians, intensivists, paramedical staff, and anaesthetists. The Vortex contains many of the recognized features of an ideal cognitive tool and may be effective in reducing implementation errors in emergency airway management. Experimental evidence is required to establish this. PMID:27440673

  15. NIF Programs Directorate: Integrated Safety Management System Implementation Plan October 2000

    SciTech Connect

    Fischer, L

    2001-09-17

    Lawrence Livermore National Laboratory (LLNL) has developed a work structure that serves to ensure work is performed safely and in compliance with applicable environment, safety, and health (ES&H) requirements. Safety begins and ends with the worker ''on the floor'' conducting the work activity. The primary focus of the NIF Programs Integrated Safety Management System (ISMS) is to provide the worker with a sound work environment, necessary resources to perform the job, and adequate procedures and controls to ensure the work is performed safely. It is to this end that the ES&H roles, responsibilities, and authorities are developed and practiced. NIF Programs recognizes and understands the Department of Energy (DOE)/University of California (UC) Contract requirements for ISMS at LLNL and the opportunities and values of the system. NIF Programs understands and supports the DOE Integrated Safety Management (ISM) objective, guiding principles, core functions, and the institutional requirements contained in the LLNL ISMS Description document. NIF Programs is committed to implementing and utilizing ISMS in all of its programs, operations, facilities, and activities and to continuing to assess its successful implementation and use. NIF Programs ISMS has been developed consistent with the requirements of the ''LLNL Integrated Safety Management System Description'' document and specific ISMS implementation needs of NIF Programs. The purpose of this document is to define for NIF Programs' workers and communicate to both senior LLNL management and DOE how and where NIF Programs satisfies the institutional ISM requirements. This document consists of: (1) A NIF Programs document hierarchy that illustrates the flow of ES&H requirements from the directorate level to the worker. (2) A roles, responsibilities, and authorities section for ES&H management chain positions, (3) An ISM implementation matrix that references specific implementing documents for each of the ISM core

  16. Implementing context information management in forensic casework: Minimizing contextual bias in firearms examination.

    PubMed

    Mattijssen, E J A T; Kerkhoff, W; Berger, C E H; Dror, I E; Stoel, R D

    2016-03-01

    Managing context information in forensic casework aims to minimize task-irrelevant information while maximizing the task-relevant information that reaches the examiner. A design and implementation of context information management (CIM) is described for forensic firearms examination. Guided by a taxonomy of different sources of context information, a flow-chart was constructed that specifies the process of casework examination and context information management. Due to the risk of bias, another examiner may need to be involved when context information management is unsuccessful. Application of context information management does not make a subjective examination objective, but can limit the risks of bias with a minimal investment of time and resources. PMID:26976470

  17. The implementation of the Water Framework Directive in The Netherlands: Does it promote integrated management?

    NASA Astrophysics Data System (ADS)

    Junier, S. J.; Mostert, E.

    The Water Framework Directive (2000/60/EC; WFD) is one of the most important European water directives of the past years. The WFD follows an integrated approach, but does it also promote integrated management in practice? In the Netherlands, the WFD has been implemented keeping the existing legal, financial and institutional framework intact as much as possible. An advantage of this arrangement is that the setting of objectives, the selection of measures for reaching the objectives and funding are well tuned to each other. This creates good conditions for the implementation of the programme of measures. A downside of this arrangement is the complexity of coordination. Coordination between different levels within the water management sector was relatively successful, but coordination with other sectors was not so successful, leading to a programme of measures consisting almost exclusively of water management measures. In the various coordination processes the role of intermediaries was significant, by supplying expertise or improving the coordination process or smoothing relations.

  18. Initiatives and outcomes of green supply chain management implementation by Chinese manufacturers.

    PubMed

    Zhu, Qinghua; Sarkis, Joseph; Lai, Kee-hung

    2007-10-01

    This paper aims to explore the green supply chain management (GSCM) initiatives (implementation) of various manufacturing industrial sectors in China and examine the links between GSCM initiatives and performance outcomes. We conducted a survey to collect data from four typical manufacturing industrial sectors in China, namely, power generating, chemical/petroleum, electrical/electronic and automobile, and received 171 valid organizational responses for data analysis. Analysis of variance (ANOVA) was used to analyze the data. The results are consistent with our prediction that the different manufacturing industry types display different levels of GSCM implementation and outcomes. We specifically found that the electrical/electronic industry has relatively higher levels of GSCM implementation and achieves better performance outcomes than the other three manufacturer types. Implications of the results are discussed and suggestions for further research on the implementation of GSCM are offered. PMID:17084502

  19. Improving the implementation of tailored expectant management in subfertile couples: protocol for a cluster randomized trial

    PubMed Central

    2013-01-01

    Background Prognostic models in reproductive medicine can help to identify subfertile couples who would benefit from fertility treatment. Expectant management in couples with a good chance of natural conception, i.e., tailored expectant management (TEM), prevents unnecessary treatment and is therefore recommended in international fertility guidelines. However, current implementation is not optimal, leaving room for improvement. Based on barriers and facilitators for TEM that were recently identified among professionals and subfertile couples, we have developed a multifaceted implementation strategy. The goal of this study is to assess the effects of this implementation strategy on the guideline adherence on TEM. Methods/design In a cluster randomized trial, 25 clinics and their allied practitioners units will be randomized between the multifaceted implementation strategy and care as usual. Randomization will be stratified for in vitro fertilization (IVF) facilities (full licensed, intermediate/no IVF facilities). The effect of the implementation strategy, i.e., the percentage guideline adherence on TEM, will be evaluated by pre- and post-randomization data collection. Furthermore, there will be a process and cost evaluation of the strategy. The implementation strategy will focus on subfertile couples and their care providers i.e., general practitioners (GPs), fertility doctors, and gynecologists. The implementation strategy addresses three levels: patient level: education materials in the form of a patient information leaflet and a website; professional level: audit and feedback, educational outreach visit, communication training, and access to a digital version of the prognostic model of Hunault on a website; organizational level: providing a protocol based on the guideline. The primary outcome will be the percentage guideline adherence on TEM. Additional outcome measures will be treatment-, patient-, and process-related outcome measures. Discussion This study

  20. The value of forage measurement information in rangeland management. [implementation of satellite data in range management

    NASA Technical Reports Server (NTRS)

    Lietzke, K. R.

    1975-01-01

    An economic model and simulation are developed to estimate the potential social benefit arising from the use of alternative measurement systems in rangeland management. In order to estimate these benefits, it was necessary to model three separate systems: the range environment, the rangeland manager, and the information system which links the two. The rancher's decision-making behavior is modeled according to sound economic principles. Results indicate substantial potential benefits, particularly when used in assisting management of government-operated ranges; possible annual benefits in this area range from $20 to $46 million, depending upon the system capabilities assumed. Possible annual benefit in privately-managed stocker operations range from $2.8 to $49.5 million, depending upon where actual rancher capabilities lie and what system capabilities are assumed.

  1. Decision making and senior management: the implementation of change projects covering clinical management in SUS hospitals.

    PubMed

    Pacheco, José Márcio da Cunha; Gomes, Romeu

    2016-08-01

    This paper analyses the decision making process for senior management in public hospitals that are a part of the National Health Service in Brazil (hereafter SUS) in relation to projects aimed at changing clinical management. The methodological design of this study is qualitative in nature taking a hermeneutics-dialectics perspective in terms of results. Hospital directors noted that clinical management projects changed the state of hospitals through: improving their organizations, mobilizing their staff in order to increase a sense of order and systemizing actions and available resources. Technical rationality was the principal basis used in the decision making process for managers. Due to the reality of many hospitals having fragmented organizations, this fact impeded the use of aspects related to rationality, such as economic and financial factors in the decision making process. The incremental model and general politics also play a role in this area. We concluded that the decision making process embraces a large array of factors including rational aspects such as the use of management techniques and the ability to analyze, interpret and summarize. It also incorporates subjective elements such as how to select values and dealing with people's working experiences. We recognized that management problems are wide in scope, ambiguous, complex and do not come with a lot of structure in practice. PMID:27557021

  2. Line manager implementation perceptions as a mediator of relations between high-performance work practices and employee outcomes.

    PubMed

    Sikora, David M; Ferris, Gerald R; Van Iddekinge, Chad H

    2015-11-01

    Strategic human resources management (SHRM) scholars recently have suggested that high-performance work practices (HPWP) implementation might serve as a critical mediator between HPWP and workplace outcomes. This study proposes and tests a model that positions line managers' perceptions regarding the extent to which they implement their organization's HPWP as a mediator of relations between HPWP and employee attitudes (i.e., turnover intentions and participative decision-making perceptions) and behavior (i.e., job performance). Using data from 507 line managers and 109 matched line manager-subordinate response sets, the results suggest that line managers' HPWP implementation perceptions fully mediate relations between HPWP and employee outcomes. The authors also found that line managers' human resources competency and political skill affect their HPWP implementation perceptions. Overall, these findings contribute to a more informed understanding of relationships between HPWP and work outcomes and suggest that additional SHRM research is needed to better understand whether and how HPWP are implemented. PMID:26011722

  3. Design and Implementation of an Interdisciplinary Marketing/Management Course on Technology and Innovation Management

    ERIC Educational Resources Information Center

    Athaide, Gerard A.; Desai, Harsha B.

    2005-01-01

    Given increasing industry demand for integrative learning, marketing curricula need to emphasize interdisciplinary approaches to teaching. Although team teaching is a useful method for achieving cross-functional integration, there are very few frameworks for effectively implementing team teaching. Consequently, marketing educators seeking to offer…

  4. Are Health Facility Management Committees in Kenya ready to implement financial management tasks: findings from a nationally representative survey

    PubMed Central

    2013-01-01

    Background Community participation in peripheral public health facilities has in many countries focused on including community representatives in Health Facility Management Committees (HFMCs). In Kenya, HFMC roles are being expanded with the phased implementation of the Health Sector Services Fund (HSSF). Under HSSF, HFMCs manage facility funds which are dispersed directly from central level into facility bank accounts. We assessed how prepared HFMCs were to undertake this new role in advance of HSSF roll out, and considered the implications for Kenya and other similar settings. Methods Data were collected through a nationally representative sample of 248 public health centres and dispensaries in 24 districts in 2010. Data collection included surveys with in-charges (n = 248), HFMC members (n = 464) and facility users (n = 698), and record reviews. These data were supplemented by semi-structured interviews with district health managers in each district. Results Some findings supported preparedness of HFMCs to take on their new roles. Most facilities had bank accounts and HFMCs which met regularly. HFMC members and in-charges generally reported positive relationships, and HFMC members expressed high levels of motivation and job satisfaction. Challenges included users’ low awareness of HFMCs, lack of training and clarity in roles among HFMCs, and some indications of strained relations with in-charges. Such challenges are likely to be common to many similar settings, and are therefore important considerations for any health facility based initiatives involving HFMCs. Conclusion Most HFMCs have the basic requirements to operate. However to manage their own budgets effectively and meet their allocated roles in HSSF implementation, greater emphasis is needed on financial management training, targeted supportive supervision, and greater community awareness and participation. Once new budget management roles are fully established, qualitative and quantitative

  5. Systematic Work Environment Management: experiences from implementation in Swedish small-scale enterprises.

    PubMed

    Gunnarsson, Kristina; Andersson, Ing-Marie; Rosén, Gunnar

    2010-01-01

    Small-scale enterprises face difficulties in fulfilling the regulations for organising Systematic Work Environment Management. This study compared three groups of small-scale manufacturing enterprises with and without support for implementing the provision. Two implementation methods, supervised and network method, were used. The third group worked according to their own ideas. Twenty-three enterprises participated. The effects of the implementation were evaluated after one year by semi-structured dialogue with the manager and safety representative. Each enterprise was classified on compliance with ten demands concerning the provision. The work environment was estimated by the WEST-method. Impact of the implementation on daily work was also studied. At the follow-up, the enterprises in the supervised method reported slightly more improvements in the fulfilment of the demands in the provision than the enterprises in the network method and the enterprises working on their own did. The effect of the project reached the employees faster in the enterprises with the supervised method. In general, the work environment improved to some extent in all enterprises. Extensive support to small-scale enterprises in terms of advise and networking aimed to fulfil the regulations of Systematic Work Environment Management had limited effect - especially considering the cost of applying these methods. PMID:20424349

  6. Implementing a genomic data management system using iRODS in the Wellcome Trust Sanger Institute

    PubMed Central

    2011-01-01

    Background Increasingly large amounts of DNA sequencing data are being generated within the Wellcome Trust Sanger Institute (WTSI). The traditional file system struggles to handle these increasing amounts of sequence data. A good data management system therefore needs to be implemented and integrated into the current WTSI infrastructure. Such a system enables good management of the IT infrastructure of the sequencing pipeline and allows biologists to track their data. Results We have chosen a data grid system, iRODS (Rule-Oriented Data management systems), to act as the data management system for the WTSI. iRODS provides a rule-based system management approach which makes data replication much easier and provides extra data protection. Unlike the metadata provided by traditional file systems, the metadata system of iRODS is comprehensive and allows users to customize their own application level metadata. Users and IT experts in the WTSI can then query the metadata to find and track data. The aim of this paper is to describe how we designed and used (from both system and user viewpoints) iRODS as a data management system. Details are given about the problems faced and the solutions found when iRODS was implemented. A simple use case describing how users within the WTSI use iRODS is also introduced. Conclusions iRODS has been implemented and works as the production system for the sequencing pipeline of the WTSI. Both biologists and IT experts can now track and manage data, which could not previously be achieved. This novel approach allows biologists to define their own metadata and query the genomic data using those metadata. PMID:21906284

  7. [The implementation of a quality management tool at a university hospital].

    PubMed

    Pertence, Poliana Prioste; Melleiro, Marta Maria

    2010-12-01

    The objective of this study was to understand the perception of a multidisciplinary health team regarding the implementation of a quality management took at a teaching hospital. The setting of this qualitative study was the University Hospital at University of São Paulo (HU-USP). Participants were seven workers from the Committee for the Implementation of the 5S Program. Data collection was performed through semi-structured interviews and the statements were analyzed according to Janesick. Two categories emerged from the statements: The perception of the multidisciplinary team participating in the implementation of the 5S Program and Factors that affect the implementation of the 5S Program. The categories were interpreted following the Donabedian framework. This study permitted to understand the perception of the multidisciplinary team regarding the implementation of a quality management tool. It is believed that the present findings will contribute with evaluating the 5S Program at the HU-USP, and provide the necessary support for reorganizing activities at that hospital. PMID:21337786

  8. Decentralized water resources management in Mozambique: Challenges of implementation at the river basin level

    NASA Astrophysics Data System (ADS)

    Inguane, Ronaldo; Gallego-Ayala, Jordi; Juízo, Dinis

    In the context of integrated water resources management implementation, the decentralization of water resources management (DWRM) at the river basin level is a crucial aspect for its success. However, decentralization requires the creation of new institutions on the ground, to stimulate an environment enabling stakeholder participation and integration into the water management decision-making process. In 1991, Mozambique began restructuring its water sector toward operational decentralized water resources management. Within this context of decentralization, new legal and institutional frameworks have been created, e.g., Regional Water Administrations (RWAs) and River Basin Committees. This paper identifies and analyzes the key institutional challenges and opportunities of DWRM implementation in Mozambique. The paper uses a critical social science research methodology for in-depth analysis of the roots of the constraining factors for the implementation of DWRM. The results obtained suggest that RWAs should be designed considering the specific geographic and infrastructural conditions of their jurisdictional areas and that priorities should be selected in their institutional capacity building strategies that match local realities. Furthermore, the results also indicate that RWAs have enjoyed limited support from basin stakeholders, mainly in basins with less hydraulic infrastructure, in securing water availability for their users and minimizing the effect of climate variability.

  9. Environmental management practices in the Lebanese pharmaceutical industries: implementation strategies and challenges.

    PubMed

    Massoud, May A; Makarem, N; Ramadan, W; Nakkash, R

    2015-03-01

    This research attempts to provide an understanding of the Lebanese pharmaceutical industries' environmental management strategies, priorities, and perceptions as well as drivers, barriers, and incentives regarding the implementation of the voluntary ISO 14001 Environmental Management System. Accordingly, a semistructured in-depth interview was conducted with the pharmaceutical industries. The findings revealed a significant lack of knowledge about the standard among the industries. The main perceived drivers for adopting the ISO 14001 are improving the companies' image and overcoming international trade. The main perceived barriers for acquiring the standard are the lack of government support and the fact that ISO 14001 is not being legally required or enforced by the government. Moreover, results revealed that adopting the ISO 14001 standard is not perceived as a priority for the Lebanese pharmaceutical industries. Although the cost of certification was not considered as a barrier for the implementation of ISO 14001, the majority of the pharmaceutical industries are neither interested nor willing to adopt the Standard if they are not exposed to any regulatory pressure or external demand. They are more concerned with quality and safety issues with the most adopted international standard among the industries being the ISO 9001 quality management system. This study highlights the aspect that financial barriers are not always the hurdles for implementing environmental management strategies in developing countries and underscores the need for regulatory frameworks and enforcement. PMID:25673269

  10. Application of analytical redundancy management to Shuttle crafts. [computerized simulation of microelectronic implementation

    NASA Technical Reports Server (NTRS)

    Montgomery, R. C.; Tabak, D.

    1979-01-01

    The study involves the bank of filters approach to analytical redundancy management since this is amenable to microelectronic implementation. Attention is given to a study of the UD factorized filter to determine if it gives more accurate estimates than the standard Kalman filter when data processing word size is reduced. It is reported that, as the word size is reduced, the effect of modeling error dominates the filter performance of the two filters. However, the UD filter is shown to maintain a slight advantage in tracking performance. It is concluded that because of the UD filter's stability in the serial processing mode, it remains the leading candidate for microelectronic implementation.

  11. Developing Leadership in Managers to Facilitate the Implementation of National Guideline Recommendations: A Process Evaluation of Feasibility and Usefulness

    PubMed Central

    Tistad, Malin; Palmcrantz, Susanne; Wallin, Lars; Ehrenberg, Anna; Olsson, Christina B.; Tomson, Göran; Holmqvist, Lotta Widén; Gifford, Wendy; Eldh, Ann Catrine

    2016-01-01

    Background: Previous research supports the claim that managers are vital players in the implementation of clinical practice guidelines (CPGs), yet little is known about interventions aiming to develop managers’ leadership in facilitating implementation. In this pilot study, process evaluation was employed to study the feasibility and usefulness of a leadership intervention by exploring the intervention’s potential to support managers in the implementation of national guideline recommendations for stroke care in outpatient rehabilitation. Methods: Eleven senior and frontline managers from five outpatient stroke rehabilitation centers participated in a four-month leadership intervention that included workshops, seminars, and teleconferences. The focus was on developing knowledge and skills to enhance the implementation of CPG recommendations, with a particular focus on leadership behaviors. Each dyad of managers was assigned to develop a leadership plan with specific goals and leadership behaviors for implementing three rehabilitation recommendations. Feasibility and usefulness were explored through observations and interviews with the managers and staff members prior to the intervention, and then one month and one year after the intervention. Results: Managers considered the intervention beneficial, particularly the participation of both senior and frontline managers and the focus on leadership knowledge and skills for implementing CPG recommendations. All the managers developed a leadership plan, but only two units identified goals specific to implementing the three stroke rehabilitation recommendations. Of these, only one identified leadership behaviors that support implementation. Conclusion: Managers found that the intervention was delivered in a feasible way and appreciated the focus on leadership to facilitate implementation. However, the intervention appeared to have limited impact on managers’ behaviors or clinical practice at the units. Future

  12. [Management of quality in an Intensive Care Unit: implementation of ISO 9001:2008 international standard].

    PubMed

    Lorenzo Torrent, R; Sánchez Palacios, M; Santana Cabrera, L; Cobian Martinez, J L; García del Rosario, C

    2010-10-01

    The Quality Management Systems make it possible to prioritize actions to maintain the safety and efficacy of health technologies. The Intensive Care Unit of our hospital has implemented a quality management plan, which has obtained accreditation as "Service Certificate that manages its activities according to UNE-EN ISO 9001:2008" standard. With the application of quality management system, it has been possible to detect the needs that the Service can cover in order to obtain the satisfaction of the patient, relative or health personnel of the other services of the hospital, to improve communications inside and outside of service, to secure greater understanding of the processes of the organization and control of risk, to delimit responsibilities clearly to all the personnel, to make better use of the time and resources and, finally, to improve the motivation of the personnel. PMID:20822737

  13. Implementing NCEP guidelines in a Web-based disease-management system.

    PubMed Central

    Tsui, F. C.; Wagner, M.; Thompson, M. E.

    1997-01-01

    DMS is a Web-based disease-management system, which facilitates easy access for users and close connection to hospital information systems, based on clinical practice guidelines. Currently we are prototyping DMS in the area of hyperlipidemia management. However our approach is general. For each office visit, DMS generates an encounter form with recommendations based on the National Cholesterol Education Program (NCEP) guidelines. In between visits, DMS provides email notifications to clinicians about delinquent laboratory studies and recommendations for patient management based on recently available information. By reviewing previous efforts for implementing NCEP guidelines and some of the pitfalls that were encountered, we first constructed DMS for hyperlipidemia management. A detailed description of DMS is provided in this paper. PMID:9357728

  14. Implementation of the Performance Management System (PMS) in Senior Secondary Schools in Botswana: An Investigation of Senior Management Team's Expected Benefits of the PMS

    ERIC Educational Resources Information Center

    Bulawa, Philip

    2012-01-01

    Different forms of the performance management system have been implemented in many countries for some years. As in other countries, in 1999 the government of Botswana took a decision to implement a performance management system (PMS) across the entire public service including schools. The government explained the purpose for which this reform was…

  15. Implementation of Sustainable Soil Management Practices to Improve Crop Production in the Different Ethiopian Agro Systems

    NASA Astrophysics Data System (ADS)

    García Moreno, R.; Gameda, S.; Diaz Alvarez, M. C.; Selasie, Y. G.

    2012-04-01

    Agriculture in Ethiopia is one of first priority since close to 10 In this context, the Ethiopian crop production faces to the following soil management challenges: lack of updated soil data, macro and micro nutrient depletion, acidity, salinity and soil surface erosion and crusting. One of the biggest issues is the loss of arable land, above 137 T/yr, reaching during some particularly dried periods until 300 T/yr. In this context, the authors constituted a working group of experts from Spanish and Ethiopian universities, local producers and international and governmental organisms to analyse the problems related to the different agro ecological zones found in Ethiopia and the management practices of different local producers. The study produced the trends to implement in the different areas to improve soil management practices in order to contribute to increase the crop production mainly to achieve food security problems. The analyse produced different working fields for the next years for addressing soil degradation, improving land resources management practices, increasing agricultural productivity, updating the available soil data, developing an international program of education, transferring of knowledge from similar study cases and implementing economical tools to help producers to assure income after severe edapho-climatic events. The practical work and the projects developed for the next period is addressed to smallholder farms belonging to the different 34 agro ecological zones identified in Ethiopia, each of them with very specific environmental, cultural and soil management practices.

  16. Tying it all together: The Integrated Academic Information Management System being implemented at Maryland.

    PubMed

    Ball, M J; Douglas, J V

    1988-01-01

    With the National Library of Medicine serving as the catalyst, the University of Maryland at Baltimore, Campus for the Professions, entered into a major initiative to integrate information management systems in support of the campus missions of education, research, and clinical care. Strategic planning initiated the integration process and continues in an iterative mode. In support of integration, changes were made in the campus organizational structure and in its technological infrastructure. Implementation involves transforming the Information Resources Management Division into an information utility on a phased and incremental basis. Collaboration with the Health Sciences Library is key to this transformation, as are numerous outreach activities. PMID:3288352

  17. Design and implementation of a nuclear weapons management system submodule: Shipboard security force system. Master's thesis

    SciTech Connect

    Settlemyer, S.R.

    1991-09-01

    The Nuclear Weapons Management System combines the strengths of an expert system with the flexibility of a database management system to assist the Weapons Officer, Security Officer, and the Personnel Reliability Program Officer in the performance of administrative duties associated with the nuclear weapons programs in the United States Navy. This thesis examines the need for, and ultimately the design of, a system that will assist the Security Officer in administrative duties associated with the Shipboard Self Defense Force. This system, designed and coded utilizing dBASE IV, can be implemented as a stand alone system. Furthermore, it interfaces with the expert system submodule that handles the PRP screening process.

  18. IEA Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers

    SciTech Connect

    Evans, Meredydd; Meier, Alan; Runci, Paul J.

    2008-08-05

    This guide presents insights and guidance from DOE’s gathered through longstanding and extensive participation in IEA implementing agreements (IAs) and annexes. Even though DOE has been a key participant in international research activities through the IEA since the 1970s, the experience, knowledge, and institutional memory associated with these activities can be lost or forgotten easily as key DOE managers retire or leave the department. The guide seeks to assemble in a single reference some of the learning that has occurred through participation in IEA IAs as a guide for BTP managers currently responsible for IAs and for those who might consider entering into new IEA activities in the future.

  19. Implement a site management strategy to save money and achieve timely closure

    SciTech Connect

    Buratovich-Collins, J.

    1996-12-31

    Federal regulatory standards for remediation of contaminated groundwater have been technically impossible to meet within reasonable time frames and budgets. A site management strategy (SMS) defending alternate cleanup levels (ACLs) or technical impracticability (TI) waivers and characterizing risk, managing site data, and implementing a practical site remediation approach can be very effective in saving time and money at contaminated sites. The engineering and scientific communities have been looking for practical solutions to groundwater cleanup at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. Records of Decisions (RODs) and Corrective Measures Implementation Plans have historically specified cleanup standards for contaminated groundwater that are technically impossible to meet within reasonable time frames (such as drinking water standards). Restoration of drinking water standards was the cleanup goal for groundwater in 270 of approximately 300 Superfund RODs issued between 1987 and 1991. These statistics notwithstanding, very few sites contaminated with organic chemicals have been remediated to numerical groundwater standards.

  20. A model of evaluation planning, implementation and management: Toward a ?culture of information? within organizations

    NASA Astrophysics Data System (ADS)

    Bhola, H. S.

    1992-03-01

    The argument underlying the ongoing "paradigm shift" from logical positivism to constructionism is briefly laid out. A model of evaluation planning, implementation and management (called the P-I-M Model, for short) is then presented that assumes a complementarity between the two paradigms. The model further implies that for effective decision-making within human organizations, both "evaluative data" and "descriptive data" are needed. "Evaluative data" generated by evaluation studies must, therefore, be undergirded by an appropriate management information system (MIS) that can generate "descriptive data", concurrently with the process of program implementation. The P-I-M Model, if fully actualized, will enable human organizations to become vibrant "cultures of information" where "informed" decision-making becomes a shared norm among all stakeholders.

  1. National Aeronautics and Space Administration Marshall Space Flight Center Space Transportation Directorate Risk Management Implementation Program

    NASA Technical Reports Server (NTRS)

    Duarte, Luis Alberto; Kross, Denny (Technical Monitor)

    2001-01-01

    The US civil aerospace program has been a great contributor to the creation and implementation of techniques and methods to identify, analyze, and confront risk. NASA has accomplished mission success in many instances, but also has had many failures. Anomalies have kept the Agency from achieving success on other occasions, as well. While NASA has mastered ways to prevent risks, and to quickly and effectively react and recover from anomalies or failures, it was not until few years ago that a comprehensive Risk Management process started being implemented in some of its programs and projects. A Continuous Risk Management (CRM) cycle process was developed and has been promoted and used successfully in programs and projects across the Agency.

  2. [Practical aspects of implementation quality management system ISO 9001:2000 by hospital infection control team].

    PubMed

    Kuziemski, Arkadiusz; Czerniak, Beata; Frankowska, Krystyna; Gonia, Ewa; Salińska, Teresa; Motuk, Andrzej; Sobociński, Zbigniew

    2009-01-01

    In 2006 the Board of the Jan Biziel Hospital in Bydgoszcz decided to include procedures of health services in the implementation process within the confines of ISO 9001:2000 certification. The hospital infection control team that has operated in the hospital since 1989 performed the analysis of the forms of activities to date and on that basis the team prepared original plan of quality management. In April 2007, this plan was successfully accepted by the certifying team. The aim of this study is to present the aforementioned plan which is the result of 18 years experience of the team. At the same time, I hope that this study will be very helpful for all professionals interested in hospital epidemiology, especially in the context of implementing quality management systems. PMID:19899608

  3. Implementation of Management Strategies for Diabetes and Hypertension: from Local to Global Health in Cardiovascular Diseases

    PubMed Central

    Bloomfield, Gerald S.; Wang, Tracy Y.; Boulware, L. Ebony; Califf, Robert M.; Hernandez, Adrian F.; Velazquez, Eric J.; Peterson, Eric D.; Li, Jennifer S.

    2016-01-01

    Diabetes and hypertension are chronic conditions that are growing in prevalence as major causal factors for cardiovascular disease. The need for chronic illness surveillance, population risk management, and successful treatment interventions are critical to reduce the burden of future cardiovascular disease. In order to address these problems, it will require population risk stratification, task sharing and shifting, and community- as well as network -based care. Information technology tools also provide new opportunities for identifying those at risk and for implementing comprehensive approaches to achieving the goal of improved health locally, regionally, nationally and globally. This article discusses ongoing efforts at one university health center in the implementation of management strategies for diabetes and hypertension at the local, regional, national, and global levels. PMID:25754564

  4. Design, development and microwave inter-comparison of dual slot antenna configurations for localized hepatic tumor management.

    PubMed

    Zafa, J; Zafa, T; Zafa, H; Sharif, F

    2015-12-01

    Slot antennas are generally preferred for localized liver cancer treatment modalities due to desired radiation characteristics. An iterative thermal/microwave numerical routine is used to analyze regular and miniature slot antenna configurations at 5.8 GHz. A thermal/microwave solver determines the specific absorption rate to malignant tissues as a pre- processing step to compute microwave solution in terms of propagation wave number, return loss and insertion loss. The regular and miniature dual slots antenna geometries were then developed to estimate the return loss characteristics against antennas slot lengths at a constant frequency of 5.8 GHz. Results reveal that the regular geometry has return loss less than -5 dB as compared to <-25 dB return loss for miniature slot antenna configuration. Furthermore, 5.8 GHz antenna geometry provides physical size reduction up to 50 %, lower fabrication cost and is a better minimally invasive choice due to further packed thermal ablation spots. PMID:26467919

  5. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  6. Design and Implementation of 3D Model Data Management System Based on SQL

    NASA Astrophysics Data System (ADS)

    Li, Shitao; Zhang, Shixin; Zhang, Zhanling; Li, Shiming; Jia, Kun; Hu, Zhongxu; Ping, Liang; Hu, Youming; Li, Yanlei

    CAD/CAM technology plays an increasingly important role in the machinery manufacturing industry. As an important means of production, the accumulated three-dimensional models in many years of design work are valuable. Thus the management of these three-dimensional models is of great significance. This paper gives detailed explanation for a method to design three-dimensional model databases based on SQL and to implement the functions such as insertion, modification, inquiry, preview and so on.

  7. Performance evaluation of River Basin Organizations to implement integrated water resources management using composite indexes

    NASA Astrophysics Data System (ADS)

    Gallego-Ayala, Jordi; Juízo, Dinis

    In the Southern African Development Community region, Integrated Water Resources Management (IWRM) principles and tools are being implemented through the existing regional framework for water resources development and management. The IWRM approach is applied at river basin level seeking a balance between the economic efficiency, social equity and environmental sustainability in water resources management and development. This paper uses composite indexes to analyze the performance of River Basin Organizations (RBOs) as key implementing agents of the IWRM framework. The assessment focuses on three RBOs that fall under the Regional Water Administration for Southern Mozambique (ARA-Sul) jurisdiction, namely: Umbeluzi, Incomati and Limpopo River Basin Management Units. The analysis focus on the computation of a set of multidimensional key performance indicators developed by Hooper (2010) but adapted to the Mozambican context. This research used 24 out of 115 proposed universal key performance indicators. The indicators for this case study were selected based on their suitability to evaluate performance in line with the legal and institutional framework context that guides the operations of RBOs in Mozambique. Finally these indicators were integrated in a composite index, using an additive and multiplicative aggregation method coupled with the Analytic Hierarchy Process technique employed to differentiate the relative importance of the various indicators considered. The results demonstrate the potential usefulness of the methodology developed to analyze the RBOs performance and proved useful in identifying the main performance areas in need of improvement for better implementation of IWRM at river basin level in Mozambique. This information should support both the IWRM framework adaptation to local context and the implementation at river basin level in order to improve water governance.

  8. International Energy Agency Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers

    SciTech Connect

    Evans, Meredydd; Runci, Paul; Meier, Alan

    2008-08-01

    This report presents results from a program evaluation of the U.S. Department of Energy?s Buildings Technologies Program (BTP) participation in collaborative international technology implementing agreements. The evaluation was conducted by researchers from the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory in the fall of 2007 and winter 2008 and was carried out via interviews with stakeholders in four implementing agreements in which BTP participates, reviews of relevant program reports, websites and other published materials. In addition to these findings, the report includes a variety of supporting materials such that aim to assist BTP managers who currently participate in IEA implementing agreements or who may be considering participation.

  9. Governing the implementation of Emergency Obstetric Care: experiences of Rural District Health Managers, Tanzania

    PubMed Central

    2014-01-01

    Background Many health policies developed internationally often become adopted at the national level and are implemented locally at the district level. A decentralized district health system led by a district health management team becomes responsible for implementing such policies. This study aimed at exploring the experiences of a district health management team in implementing Emergency Obstetric Care (EmOC) related policies and identifying emerging governance aspects. Methods The study used a qualitative approach in which data was obtained from thirteen individual interviews and one focus group discussion (FGD). Interviews were conducted with members of the district health management team, district health service boards and NGO representatives. The FGD included key informants who were directly involved in the work of implementing EmOC services in the district. Documentary reviews and observation were done to supplement the data. All the materials were analysed using a qualitative content analysis approach. Results Implementation of EmOC was considered to be a process accompanied by achievements and challenges. Achievements included increased institutional delivery, increased number of ambulances, training service providers in emergency obstetric care and building a new rural health centre that provides comprehensive emergency obstetric care. These achievements were associated with good leadership skills of the team together with partnerships that existed between different actors such as the Non-Governmental Organization (NGO), development partners, local politicians and Traditional Birth Attendants (TBAs). Most challenges faced during the implementation of EmOC were related to governance issues at different levels and included delays in disbursement of funds from the central government, shortages of health workers, unclear mechanisms for accountability, lack of incentives to motivate overburdened staffs and lack of guidelines for partnership development

  10. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects. PMID:24523303

  11. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  12. Is normative integrated water resources management implementable? Charting a practical course with lessons from Southern Africa

    NASA Astrophysics Data System (ADS)

    Merrey, D. J.

    At the seventh Waternet/WARFSA/GWP-SA Symposium, Lewis Jonker described the “perceived failure of implementing IWRM in South Africa.” This paper starts from Jonker’s observation - which can certainly be defended - and argues that attempts to implement full Integrated Water Resources Management (IWRM) are doomed to failure and disappointment. The paper therefore offers a more practical ‘expedient’ solution. The paper is based on research done in Tanzania (Ruaha Basin) and South Africa (Olifants Basin) that is further informed by a growing literature critical of the IWRM paradigm as currently understood and practiced. As a guide to actual policies and their implementation in developing countries, IWRM has led to mis-guided priorities and paralysis of development programmes. An alternative approach is one in which basin managers identify priority problem areas, and focus specifically on finding solutions to these problems within an integrated framework, rather than starting with a broad set of principles and trying to implement these. The paper proposes that a shift away from IWRM as a normative concept is now overdue, and argues for realism and action by focusing attention on and prioritizing the critical needs of poor people in Africa. People cannot wait forever .

  13. [Practical implementation of a quality management system in a radiological department].

    PubMed

    Huber, S; Zech, C J

    2011-10-01

    This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards. PMID:21879364

  14. Advanced consequence management program: challenges and recent real-world implementations

    NASA Astrophysics Data System (ADS)

    Graser, Tom; Barber, K. S.; Williams, Bob; Saghir, Feras; Henry, Kurt A.

    2002-08-01

    The Enhanced Consequence Management, Planning and Support System (ENCOMPASS) was developed under DARPA's Advanced Consequence Management program to assist decision-makers operating in crisis situations such as terrorist attacks using conventional and unconventional weapons and natural disasters. ENCOMPASS provides the tools for first responders, incident commanders, and officials at all levels to share vital information and consequently, plan and execute a coordinated response to incidents of varying complexity and size. ENCOMPASS offers custom configuration of components with capabilities ranging from map-based situation assessment, situation-based response checklists, casualty tracking, and epidemiological surveillance. Developing and deploying such a comprehensive system posed significant challenges for DARPA program management, due to an inherently complex domain, a broad spectrum of customer sites and skill sets, an often inhospitable runtime environment, demanding development-to-deployment transition requirements, and a technically diverse and geographically distributed development team. This paper introduces ENCOMPASS and explores these challenges, followed by an outline of selected ENCOMPASS deployments, demonstrating how ENCOMPASS can enhance consequence management in a variety real world contexts.

  15. Multidisciplinary teams of case managers in the implementation of an innovative integrated services delivery for the elderly in France

    PubMed Central

    2014-01-01

    Background The case management process is now well defined, and teams of case managers have been implemented in integrated services delivery. However, little is known about the role played by the team of case managers and the value in having multidisciplinary case management teams. The objectives were to develop a fuller understanding of the role played by the case manager team and identify the value of inter-professional collaboration in multidisciplinary teams during the implementation of an innovative integrated service in France. Methods We conducted a qualitative study with focus groups comprising 14 multidisciplinary teams for a total of 59 case managers, six months after their recruitment to the MAIA program (Maison Autonomie Integration Alzheimer). Results Most of the case managers saw themselves as being part of a team of case managers (91.5%). Case management teams help case managers develop a comprehensive understanding of the integration concept, meet the complex needs of elderly people and change their professional practices. Multidisciplinary case management teams add value by helping case managers move from theory to practice, by encouraging them develop a comprehensive clinical vision, and by initiating the interdisciplinary approach. Conclusions The multidisciplinary team of case managers is central to the implementation of case management and helps case managers develop their new role and a core inter-professional competency. PMID:24708721

  16. Management experiences and trends for water reuse implementation in Northern California.

    PubMed

    Bischel, Heather N; Simon, Gregory L; Frisby, Tammy M; Luthy, Richard G

    2012-01-01

    In 2010, California fell nearly 300,000 acre-ft per year (AFY) short of its goal to recycle 1,000,000 AFY of municipal wastewater. Growth of recycled water in the 48 Northern California counties represented only 20% of the statewide increase in reuse between 2001 and 2009. To evaluate these trends and experiences, major drivers and challenges that influenced the implementation of recycled water programs in Northern California are presented based on a survey of 71 program managers conducted in 2010. Regulatory requirements limiting discharge, cited by 65% of respondents as a driver for program implementation, historically played an important role in motivating many water reuse programs in the region. More recently, pressures from limited water supplies and needs for system reliability are prevalent drivers. Almost half of respondents (49%) cited ecological protection or enhancement goals as drivers for implementation. However, water reuse for direct benefit of natural systems and wildlife habitat represents just 6-7% of total recycling in Northern California and few financial incentives exist for such projects. Economic challenges are the greatest barrier to successful project implementation. In particular, high costs of distribution systems (pipelines) are especially challenging, with $1 to 3 million/mile costs experienced. Negative perceptions of water reuse were cited by only 26% of respondents as major hindrances to implementation of surveyed programs. PMID:22107126

  17. Implementing the EU Floods Directive (2007/60/EC) in Austria: Flood Risk Management Plans

    NASA Astrophysics Data System (ADS)

    Neuhold, Clemens

    2013-04-01

    he Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (EFD) aims at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community. This task is to be achieved based on three process steps (1) preliminary flood risk assessment (finalised by the end of 2011), (2) flood hazard maps and flood risk maps (due 2013) and (3) flood risk management plans (due 2015). Currently, an interdisciplinary national working group is defining the methodological framework for flood risk management plans in Austria supported by a constant exchange with international bodies and experts. Referring to the EFD the components of the flood risk management plan are (excerpt): 1. conclusions of the preliminary flood risk assessment 2. flood hazard maps and flood risk maps and the conclusions that can be drawn from those maps 3. a description of the appropriate objectives of flood risk management 4. a summary of measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management The poster refers to some of the major challenges in this process, such as the legal provisions, coordination of administrative units, definition of public relations, etc. The implementation of the EFD requires the harmonisation of legal instruments of various disciplines (e.g. water management, spatial planning, civil protection) enabling a coordinated - and ideally binding - practice of flood risk management. This process is highly influenced by the administrative organisation in Austria - federal, provincial and municipality level. The Austrian approach meets this organisational framework by structuring the development of the flood risk management plan into 3 time-steps: (a) federal blueprint, (b) provincial editing and (c) federal finishing as well as reporting to the European Commission. Each time

  18. Improving Knowledge Management in the Health Service: Re-Engineering Approach Towards Successful Implementation

    NASA Astrophysics Data System (ADS)

    Gyampoh-Vidogah, Regina; Moreton, Robert

    Changes to business practices involve risks. There has always been an attempt to develop various concepts for successful restructuring of business processes to enable technology adoption. This is due to the fact that the success of any business depends as much on how it is structured, as well as its ability to adopt new technology. As a consequence, the great success stories of the global economy emanate from those organisations most capable of adopting new technology, which invariably includes information technology (IT). This chapter examines how business process re-engineering (BPR) can be used to improve knowledge management (KM) in health services by (i) assessing the effectiveness and usefulness of BPR; (ii) present a critical review of approaches to BPR; and (iii) describe a framework for using BPR for KM based on empirical research. The aim is to provide a sound strategic and tactical management approach for successful implementation of knowledge management systems (KMS) to improve health-care service project administration.

  19. Development, implementation and evaluation of a new adult asthma self-management program.

    PubMed

    Tousman, Stuart; Zeitz, Howard; Taylor, Linda D; Bristol, Cecelia

    2007-01-01

    The purpose of the research was to develop, implement, and evaluate a new adult asthma self-management program with a multidisciplinary perspective. Small groups of adults met for 2 hr for 7 consecutive weekly meetings. Participants were asked to practice asthma specific behaviors (including peak expiratory flow monitoring, avoidance/removal of asthma triggers, and controller medication adherence) and general lifestyle behaviors (including drinking water, practicing relaxation, washing hands, and exercising). Learner-centered teaching techniques such as interactive communication and social support were utilized to help participants practice self-management behaviors including problem-solving and goal-setting. Paired sample t-tests included statistically significant improvements in asthma knowledge, asthma specific quality of life (QOL), asthma specific behaviors such as peak flow monitoring and general life style behaviors such as frequency of daily exercise. These results provide evidence that this new adult asthma self-management program can lead to both knowledge acquisition and behavioral changes. PMID:18092916

  20. IS0 9000 Implementation and Assessment: A Guide to Developing and Evaluating Quality Management Systems

    NASA Technical Reports Server (NTRS)

    Navarro, Robert J.; Grimm, Barry

    1996-01-01

    The agency has developed this reference publication to aid NASA organizations and their suppliers in the transition to IS0 9000. This guide focuses on the standard s intent, clarifies its requirements, offers implementation examples and highlights interrelated areas. It can assist anyone developing or evaluating NASA or supplier quality management systems. The IS0 9000 standards contain the basic elements for managing those processes that affect an organization's ability to consistently meet customer requirements. IS0 9000 was developed through the International Organization for Standardization and has been adopted as the US. national standard. These standards define a flexible foundation for customer focused process measurement, management and improvement that is the hallmark of world class enterprises.

  1. Implementation of a forest management module into BIOME-BGC and its application

    NASA Astrophysics Data System (ADS)

    Jochheim, H.; Puhlmann, M.; Pohle, D.

    2007-05-01

    The wood export from forest ecosystems by management measures causes nutrient losses, and is consequently accompanied by a substantial impact on the sustainability of forest ecosystems. Thus, for simulation studies on managed forests, the effects of wood export have to be taken into account. The original BIOME-BGC model (Vers. 4.2; Running & Coughlan 1988, Running & Gower 1991, Running & Hunt 1993, Thornton et al. 2002) is designed for the simulation of natural, but not managed terrestrial ecosystems. We developed an approach for a management module within BIOME-BGC with the following features: 1) thinning and clear-cut with the options of varying length of thinning and rotation periods, 2) alternatively use of tables or functions (depending on stand age and stem biomass) for determining the thinning fraction, that can be derived from yield tables, 3) use of age-dependent biomass expansion functions for determining the exported wood fraction during harvest, 4) planting routine with the options of changing tree species and defining biomass of planted trees. The presentation describes the concept of the implemented management module and shows simulation results on the effects of different forest management options (length of thinning or rotation period, harvest intensity, tree species change) on the carbon, nitrogen, and water budgets.

  2. Fingernail Configuration

    PubMed Central

    Jung, Jin Woo; Shin, Jun Ho; Kwon, Yu Jin; Hwang, Jae Ha; Lee, Sam Yong

    2015-01-01

    Background A number of conditions can alter a person's fingernail configuration. The ratio between fingernail width and length (W/L) is an important aesthetic criterion, and some underlying diseases can alter the size of the fingernail. Fingernail curvature can be altered by systemic disorders or disorders of the fingernail itself. Although the shape and curvature of the fingernail can provide diagnostic clues for various diseases, few studies have precisely characterized normal fingernail configuration. Methods We measured the W/L ratio of the fingernail, transverse fingernail curvature, hand length, hand breadth, and distal interphalangeal joint width in 300 volunteers with healthy fingernails. We also investigated whether age, sex, height, and handedness influenced the fingernail W/L ratio and transverse fingernail curvature. Results In women, fingernail W/L ratios were similar across all five fingers, and were lower than those in men. The highest value of transverse fingernail curvature was found in the thumb, followed by the index, middle, ring, and little fingers. Handedness and aging influenced transverse fingernail curvature, but not the fingernail W/L ratio. Fingernails were flatter on the dominant hand than on the non-dominant hand. The radius of transverse fingernail curvature increased with age, indicating that fingernails tended to flatten with age. Conclusions Our quantitative data on fingernail configuration can be used as a reference range for diagnosing various diseases and deformities of the fingernail, and for performing reconstructive or aesthetic fingernail surgery. PMID:26618124

  3. [Design, implementation and evaluation of a management model of patient safety in hospitals in Catalonia, Spain].

    PubMed

    Saura, Rosa Maria; Moreno, Pilar; Vallejo, Paula; Oliva, Glòria; Alava, Fernando; Esquerra, Miquel; Davins, Josep; Vallès, Roser; Bañeres, Joaquim

    2014-07-01

    Since its inception in 2006, the Alliance for Patient Safety in Catalonia has played a major role in promoting and shaping a series of projects related to the strategy of the Ministry of Health, Social Services and Equality, for improving patient safety. One such project was the creation of functional units or committees of safety in hospitals in order to facilitate the management of patient safety. The strategy has been implemented in hospitals in Catalonia which were selected based on criteria of representativeness. The intervention was based on two lines of action, one to develop the model framework and the other for its development. Firstly the strategy for safety management based on EFQM (European Foundation for Quality Management) was defined with the development of standards, targets and indicators to implement security while the second part involved the introduction of tools, methodologies and knowledge to the management support of patient safety and risk prevention. The project was developed in four hospital areas considered higher risk, each assuming six goals for safety management. Some of these targets such as the security control panel or system of adverse event reporting were shared. 23 hospitals joined the project in Catalonia. Despite the different situations in each centre, high compliance was achieved in the development of the objectives. In each of the participating areas the security control panel was developed. Stable structures for safety management were established or strengthened. Training in patient safety played and important role, 1415 professionals participated. Through these kind of projects not only have been introduced programs of proven effectiveness in reducing risks, but they also provide to the facilities a work system that allows autonomy in diagnosis and analysis of the different risk situations or centre specific safety issues. PMID:25128360

  4. Rheumatology clinicians’ experiences of brief training and implementation of skills to support patient self-management

    PubMed Central

    2014-01-01

    Background Self-management of arthritis requires informed, activated patients to manage its physical and psychosocial consequences. Patient activation and self-management can be enhanced through the use of cognitive-behavioural approaches, which have a strong evidence base and provide insight into the variation in outcome of patients with ostensibly the same degree of disease activity. However, training for rheumatology health professionals in theory and skills underpinning the facilitation of self-management is not widely available. To develop such training, this study explored rheumatology clinicians’ experiences of a variety of brief skills training courses to understand which aspects were helpful or unhelpful, and to identify the barriers and facilitators of applying the skills in clinical practice. Methods 16 clinicians who had previously attended communication and self-management skills training participated in semi-structured interviews: 3 physicians, 3 physiotherapists, 4 nurses, 6 occupational therapists. Transcripts were analysed (ED) using a hybrid inductive and deductive thematic approach, with a subset independently analysed (SH, RG-H, RJ). Results 3 overarching themes captured views about training undertaken and subsequent use of approaches to facilitate self-management. In ‘putting theory into practice’, clinicians felt that generic training was not as relevant as rheumatology-specific training. They wanted a balance between theory and skills practice, and identified the importance of access to ongoing support. In ‘challenging professional identity’, models of care and working cultures influenced learning and implementation. Training often challenged a tendency to problem-solve on behalf of patients and broadened clinicians’ remit from a primary focus on physical symptoms to the mind and body interaction. In ‘enhanced practice’, clinicians viewed consultations as enhanced after training. Focus had shifted from clinicians’ agendas to

  5. Beneficial impacts of the implementation of the accidental release risk management regulation

    SciTech Connect

    Nand, K.

    1999-07-01

    The US Environmental Protection Agency (EPA) Risk Management Program and Plan (RMP) regulations were issued on June 20, 1996, which require the implementation of a Risk Management Program by June 21, 1999. These regulations are designed to prevent serious chemical accidents that could affect public health and the environment and to improve the response to any accidents that do occur. The RMP regulations have forced various industries handling regulated substances to review their operations and develop measures to prevent accidents, reduce the quantity of regulated substance released during an accident, reduce the quantity stored at the facility or completely eliminate the use of the regulated substance. The net result of these actions will be to overall reduce the risk and cause beneficial impacts to the surrounding community. A review analysis was performed of the various actions, including the control measures implemented by various facilities to prevent the accidents and reduce the overall risk as part of the implementation of RMP regulations. The results of the review analysis indicated that for some of the facilities the best control measure would be to substitute the regulated substance with a less hazardous material. For example, anhydrous chlorine may be replaced by sodium hypochlorite for water and wastewater disinfection purposes.

  6. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  7. Study of operational risk-based configuration control

    SciTech Connect

    Vesely, W E; Samanta, P K; Kim, I S

    1991-08-01

    This report studies aspects of a risk-based configuration control system to detect and control plant configurations from a risk perspective. Configuration control, as the term is used here, is the management of component configurations to achieve specific objectives. One important objective is to control risk and safety. Another is to operate efficiently and make effective use of available resources. PSA-based evaluations are performed to study configuration to core-melt frequency and core-melt probability for two plants. Some equipment configurations can cause large core-melt frequency and there are a number of such configurations that are not currently controlled by technical specifications. However, the expected frequency of occurrence of the impacting configurations is small and the core-melt probability contributions are also generally small. The insights from this evaluation are used to develop the framework for an effective risk-based configuration control system. The focal points of such a system and the requirements for tools development for implementing the system are defined. The requirements of risk models needed for the system, and the uses of plant-specific data are also discussed. 18 refs., 25 figs., 10 tabs.

  8. An analysis of the implementation of an environmental management system in a local public administration.

    PubMed

    Lozano, Macarena; Vallés, José

    2007-03-01

    The Environmental Management System (EMS) is commonly implemented in private firms. However, on the basis of a strengths, weaknesses, opportunities and threats (SWOT) analysis, our work analyzes the consequences of implementing an EMS within the context of local public administrations, particularly regarding the City Council of Ohanes in Almería (Spain). This is the first European corporation to implement an EMS according to the ISO 14001 Standard, certified by the Spanish Association of Normalization and Certification. Its analysis would be equivalent to the Shumpeterian "market innovator study", so that public administration "followers" can take advantage of the derived benefits and of minimizing the negative effects of such an experience. On the other hand, we show that the economic and environmental advantages derived from the EMS go beyond the activities that the City Council is in charge of. They have spillover effects that extend them to all economic activities in the municipality and these effects are expected to be increased in the medium and long-term perspective. In this paper, we compare the costs and benefits that the municipality obtains in two cases: the City Council implements the EMS or it does not implement it. The main objective of this article is to show the economic and environmental advantages obtained by a municipality when it is only the City Council who is implementing an EMS. It is logical to suppose that this case study can stimulate other municipalities to use this instrument, even if the economic and environmental characteristics of the municipality are different. PMID:16632169

  9. The implementation of quality management systems in hospitals: a comparison between three countries

    PubMed Central

    Wagner, C; Gulácsi, L; Takacs, E; Outinen, M

    2006-01-01

    Background Is the implementation of Quality Management (QM) in health care proceeding satisfactorily and can national health care policies influence the implementation process? Policymakers and researchers in a country need to know the answer to this question. Cross country comparisons can reveal whether sufficient progress is being made and how this can be stimulated. The objective of the study was to investigate agreement and disparities in the implementation of QMS between The Netherlands, Hungary and Finland with respect to the evaluation model used and the national policy strategy of the three countries. Methods The study has a cross sectional design, based on measurements in 2000. Empirical data about QM-activities in hospitals were gathered by a self-administered questionnaire. The questionnaires were answered by the directors of the hospitals or the quality coordinators. The analyses are based on data from 101 hospitals in the Netherlands, 116 hospitals in Hungary and 59 hospitals in Finland. Outcome measures are the developmental stage of the Quality Management System (QMS), the development within five focal areas, and distinct QM-activities which were listed in the questionnaire. Results A mean of 22 QM-activities per hospital was found in the Netherlands and Finland versus 20 QM-activities in Hungarian hospitals. Only a small number of hospitals has already implemented a QMS (4% in The Netherlands,0% in Hungary and 3% in Finland). More hospitals in the Netherlands are concentrating on quality documents, whereas Finnish hospitals are concentrating on training in QM and guidelines. Cyclic quality improvement activities have been developed in the three countries, but in most hospitals the results were not used for improvements. All three countries pay hardly any attention to patient participation. Conclusion The study demonstrates that the implementation of QM-activities can be measured at national level and that differences between countries can be

  10. Improving the management of sepsis in a district general hospital by implementing the 'Sepsis Six' recommendations.

    PubMed

    Kumar, Prashant; Jordan, Mark; Caesar, Jenny; Miller, Sarah

    2015-01-01

    Sepsis is a common condition with a major global impact on healthcare resources and expenditure. The Surviving Sepsis Campaign has been vigorous in promoting internationally recognised pathways to improve the management of septic patients and decrease mortality. However, translating recommendations into practice is a challenging and complex task that requires a multi-faceted approach with sustained engagement from local stakeholders. Whilst working at a district general hospital in New Zealand, we were concerned by the seemingly inconsistent management of septic patients, often leading to long delays in the initiation of life-saving measures such as antibiotic, fluid, and oxygen administration. In our hospital there were no clear systems, protocols or guidelines in place for identifying and managing septic patients. We therefore launched the Sepsis Six resuscitation bundle of care in our hospital in an attempt to raise awareness amongst staff and improve the management of septic patients. We introduced a number of simple low-cost interventions that included educational sessions for junior doctors and nursing staff, as well as posters and modifications to phlebotomy trolleys that acted as visual reminders to implement the Sepsis Six bundle. Overall, we found there to a be a steady improvement in the delivery of the Sepsis Six bundle in septic patients with 63% of patients receiving appropriate care within one hour, compared to 29% prior to our interventions. However this did not translate to an improvement in patient mortality. This project forms part of an on going process to instigate a fundamental culture change among local healthcare professionals regarding the management of sepsis. Whilst we have demonstrated improved implementation of the Sepsis Six bundle, the key challenge remains to ensure that momentum of this project continues and forms a platform for sustainable clinical improvement in the long term. PMID:26734403

  11. Management of sick children by health workers in Ballabgarh: lessons for implementation of IMCI in India.

    PubMed

    Anand, K; Patro, B K; Paul, E; Kapoor, S K

    2004-02-01

    The aim of this study was to determine the impact of training of health workers in the management of pediatric morbidity in terms of reduction in infant mortality rate (IMR) a 2-year period in rural Ballabgarh with a present IMR of 37 per 1000 live births. The study was designed as a pre- and post-intervention trial. The intervention was started in November 1999 and the outcome measured for the years 2000 and 2001. A sample size of 4000 was estimated for a power of 80 per cent at 5 per cent significance level. The training of the workers was for 4 days and included didactics, video-films, patient demonstrations, etc. Data on under-fives' deaths and their causes using a verbal autopsy tool was done as a part of the routine data collection system. The workers management of pediatric morbidity was assessed based on the post-training knowledge gain, forms filled by them, and referrals seen at the secondary level. The knowledge of the workers on disease and their management improved after the initial training but reached a plateau at a 50 per cent score. A review of 948 forms showed that the workers' disease classification and management was not satisfactory, especially for pneumonia and sick neonates. It was better for fever, measles, dysentery, and diarrhoea. A review of 11 cases referred by workers confirmed this. There was no impact on IMR. A look at the cause of death revealed that malnutrition, diarrhoea, and pneumonia to be the main causes among post-neonatal deaths and birth-asphyxia and prematurity as the main cause of deaths in the neonates. While implementing Integrated Management of Childhood Illnesses (IMCI) in India through the health workers, increased emphasis needs to be placed on training and supervision. Community level issues, such as healthcare seeking, female neglect, etc., may limit the scope of reduction in IMR due to implementation of IMCI. PMID:14984169

  12. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  13. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  14. How CEOs use management information systems for strategy implementation in hospitals.

    PubMed

    Naranjo-Gil, David; Hartmann, Frank

    2007-04-01

    Institutional and market changes seem to force hospitals across the Western world to revitalize their corporate strategies towards more cost efficiency on the one hand, and more flexibility towards customer demands on the other hand. Hospitals, however, apparently differ in the extent to which they are able to implement such strategies effectively. This paper explores whether these different levels of effectiveness depend on how hospitals' top managers' use of the available management information systems (MIS). Based on data obtained from the 218 CEOs of public hospitals in Spain, we analyze how CEOs' professional and educational backgrounds affect their use of MIS, and how the use of the MIS subsequently supports or inhibits the implementation of these strategic goals. The results indicate that CEOs with a predominant clinical background focus more on non-financial information for decision-making and prefer an interactive style of using MIS, which together support flexibility strategies. CEOs with a predominant administrative background seem more effective in establishing cost-reduction strategies, through their larger inclination to emphasize financial information in combination with a diagnostic use of the MIS. Implications for the strategic management of hospitals are outlined. PMID:16781001

  15. Dynamic Airspace Configuration

    NASA Technical Reports Server (NTRS)

    Bloem, Michael J.

    2014-01-01

    In air traffic management systems, airspace is partitioned into regions in part to distribute the tasks associated with managing air traffic among different systems and people. These regions, as well as the systems and people allocated to each, are changed dynamically so that air traffic can be safely and efficiently managed. It is expected that new air traffic control systems will enable greater flexibility in how airspace is partitioned and how resources are allocated to airspace regions. In this talk, I will begin by providing an overview of some previous work and open questions in Dynamic Airspace Configuration research, which is concerned with how to partition airspace and assign resources to regions of airspace. For example, I will introduce airspace partitioning algorithms based on clustering, integer programming optimization, and computational geometry. I will conclude by discussing the development of a tablet-based tool that is intended to help air traffic controller supervisors configure airspace and controllers in current operations.

  16. Implementation of Parent Management Training-Oregon Model (PMTO(TM) ) in Iceland: building sustained fidelity.

    PubMed

    Sigmarsdóttir, Margrét; Guðmundsdóttir, Edda Vikar

    2013-06-01

    Bringing empirically supported treatments (ESTs) into community settings is a challenge because of threats to therapy adherence. The nationwide implementation of Parent Management Training-the Oregon Model (PMTO) in Iceland was studied by comparing therapists' competent adherence to PMTO across three generations of therapists. To assess therapists' competence and adherence to the PMTO method, the Fidelity of Implementation Rating System (FIMP) was used as the measuring device. Of 16 therapists across three generations who entered training, 12 completed with certification. As expected, each of the three generations obtained adequate FIMP scores. Generations 1 and 3 showed equivalent levels of performance on FIMP scores at certification. A small drop in FIMP scores for Generation 2 was explained in terms of translating and culturally adjusting materials and strengthening training procedures. Results are parallel to earlier findings from the nationwide PMTO implementation in Norway and support the idea that PMTO can be implemented in community settings with high fidelity even when resources are scarce. PMID:23763682

  17. Design and implementation of integrated solid wastes management pattern in industrial zones, case study of Shahroud, Iran

    PubMed Central

    2014-01-01

    Background The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Results Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Conclusion Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems. PMID:24423020

  18. Capacity building in rural Guatemala by implementing a solid waste management program

    SciTech Connect

    Zarate, M.A. Slotnick, J.; Ramos, M.

    2008-12-15

    The development and implementation of a solid waste management program served to build local capacity in San Mateo Ixtatan between 2002 and 2003 as part of a public health action plan. The program was developed and implemented in two phases: (1) the identification and education of a working team from the community; and (2) the completion of a solid waste classification and quantification study. Social capital and the water cycle were two public health approaches utilized to build a sustainable program. The activities accomplished gained support from the community and municipal authorities. A description of the tasks completed and findings of the solid waste classification and quantification performed by a local working group are presented in this paper.

  19. Implementing business continuity management systems and sharing best practices at a European bank.

    PubMed

    Aronis, Stelios; Stratopoulos, Georgios

    2016-01-01

    This paper provides an overview of the methodology applied by the Alpha Bank Group in order to implement a business continuity management (BCM) programme to its parent company (Alpha Bank SA), as well as to its subsidiaries in Albania, Bulgaria, Cyprus, Former Yugoslav Republic of Macedonia, Greece, Romania, Serbia, UK and Ukraine. It also reviews the problems faced, how they were overcome and the lessons learned. When implementing a BCM programme in a large organisation, it is very important to follow the methodology described by BCM standard ISO 22301, otherwise the business continuity plan is unlikely to work efficiently or comply with the business recovery requirements, as well as with the requirements of other interested parties, such as customers, regulatory authorities, vendors, service providers, critical associates, etc. PMID:26897617

  20. Capacity building in rural Guatemala by implementing a solid waste management program.

    PubMed

    Zarate, M A; Slotnick, J; Ramos, M

    2008-12-01

    The development and implementation of a solid waste management program served to build local capacity in San Mateo Ixtatán between 2002 and 2003 as part of a public health action plan. The program was developed and implemented in two phases: (1) the identification and education of a working team from the community; and (2) the completion of a solid waste classification and quantification study. Social capital and the water cycle were two public health approaches utilized to build a sustainable program. The activities accomplished gained support from the community and municipal authorities. A description of the tasks completed and findings of the solid waste classification and quantification performed by a local working group are presented in this paper. PMID:18166447

  1. Implementing a patient blood management program in Norway: Where to start?

    PubMed

    Espinosa, A; Arsenovic, M; Hervig, T; Sundic, T; Aandahl, A; Kronborg, J; Seghatchian, J

    2016-06-01

    Norway has recently established a working group to implement a national patient blood management (PBM) program. Although benchmarking regarding blood usage is challenging in Norway due to legal barriers, a survey was sent to different hospitals to identify possible areas to be prioritized in the first phase of the PBM program. Among them, optimizing the patient's hemoglobin level before elective surgery and implementing electronic check-lists for the indication of transfusion when ordering blood products are two measures that may have a considerable impact on blood usage. The results of the survey also showed that patients may receive a red blood cell transfusion at hemoglobin levels that are higher than those internationally recommended. Since there are no national guidelines for the use of blood products, agreement regarding hemoglobin thresholds is essential to reduce variation in transfusion practice. To achieve these goals, the transfusion specialist plays a key role in promoting the principles behind the PBM concept at the local hospital. PMID:27216542

  2. The Mixed Waste Management Facility: Technology selection and implementation plan, Part 2, Support processes

    SciTech Connect

    Streit, R.D.; Couture, S.A.

    1995-03-01

    The purpose of this document is to establish the foundation for the selection and implementation of technologies to be demonstrated in the Mixed Waste Management Facility, and to select the technologies for initial pilot-scale demonstration. Criteria are defined for judging demonstration technologies, and the framework for future technology selection is established. On the basis of these criteria, an initial suite of technologies was chosen, and the demonstration implementation scheme was developed. Part 1, previously released, addresses the selection of the primary processes. Part II addresses process support systems that are considered ``demonstration technologies.`` Other support technologies, e.g., facility off-gas, receiving and shipping, and water treatment, while part of the integrated demonstration, use best available commercial equipment and are not selected against the demonstration technology criteria.

  3. Database Design and Implementation of Game Management System for Rescue Robot Contest

    NASA Astrophysics Data System (ADS)

    Yamauchi, Hitoshi; Kojima, Atsuhiro; Koeda, Masanao

    The Rescue Robot Contest is one of the robot contests concerning lifesaving in urban disasters. In this contest, loads of rescue dummies simulating disaster victims, and contest progression status are presented to audiences, and team members operating robots. This presentation is important for both robot activity evaluation and production effect. For these purposes, a game management system for Rescue Robot Contest is originally constructed and operated. In this system, a database system is employed as base system. And this system's role is for both recording all data and events, and real-time processing for the presentation. In this paper, design and implementation of the tables and built-in functions of the database which is foundation of this system are presented. For real-time processing, embedded functions and trigger functions are implemented. These functions generate unique latest records into specific tables which stores only latest data for quick access.

  4. Strategic implementation of integrated water resources management in Mozambique: An A’WOT analysis

    NASA Astrophysics Data System (ADS)

    Gallego-Ayala, Jordi; Juízo, Dinis

    The Integrated Water Resources Management (IWRM) paradigm has become an important framework in development and management of water resources. Many countries in the Southern Africa region have begun water sector reforms to align the sector with the IWRM concepts. In 2007 the Mozambican Government started to update the policy and the legal framework of the water sector to foster the application of IWRM concept as a basis for achieving sustainable development. However the steps towards the implementation of this national framework are still in preparation. This research aims to identify and establish a priority ranking of the fundamental factors likely to affect the outcome of the IWRM reforms in Mozambique. This study uses the hybrid multi-criteria decision method A’WOT, a methodology coined by Kurttila et al. (2000). This method relies on the combination of the Strengths, Weaknesses, Opportunities, and Threats (SWOT) technique and the Analytic Hierarchy Process (AHP) technique. Using this procedure it is possible to identify and rank the factors affecting the functioning of a system. The key factors affecting the implementation of the IWRM, analysed in this study, were identified through an expert group discussion. These factors have been grouped into different categories of SWOT. Subsequently, the AHP methodology was applied to obtain the relative importance of each factor captured in the SWOT analysis; to this end the authors interviewed a panel of water resources management experts and practitioners. As a result, of this study and the application of the A’WOT methodology, the research identified and ranked the fundamental factors for the success of the IWRM strategy in Mozambique. The results of this study suggest that in Mozambique a planning strategy for the implementation of the IWRM should be guided mainly by combination of interventions in factors falling under opportunity and weakness SWOT groups.

  5. Implementation and management of a biomedical observation dictionary in a large healthcare information system

    PubMed Central

    Vandenbussche, Pierre-Yves; Cormont, Sylvie; André, Christophe; Daniel, Christel; Delahousse, Jean; Charlet, Jean; Lepage, Eric

    2013-01-01

    Objective This study shows the evolution of a biomedical observation dictionary within the Assistance Publique Hôpitaux Paris (AP-HP), the largest European university hospital group. The different steps are detailed as follows: the dictionary creation, the mapping to logical observation identifier names and codes (LOINC), the integration into a multiterminological management platform and, finally, the implementation in the health information system. Methods AP-HP decided to create a biomedical observation dictionary named AnaBio, to map it to LOINC and to maintain the mapping. A management platform based on methods used for knowledge engineering has been put in place. It aims at integrating AnaBio within the health information system and improving both the quality and stability of the dictionary. Results This new management platform is now active in AP-HP. The AnaBio dictionary is shared by 120 laboratories and currently includes 50 000 codes. The mapping implementation to LOINC reaches 40% of the AnaBio entries and uses 26% of LOINC records. The results of our work validate the choice made to develop a local dictionary aligned with LOINC. Discussion and Conclusions This work constitutes a first step towards a wider use of the platform. The next step will support the entire biomedical production chain, from the clinician prescription, through laboratory tests tracking in the laboratory information system to the communication of results and the use for decision support and biomedical research. In addition, the increase in the mapping implementation to LOINC ensures the interoperability allowing communication with other international health institutions. PMID:23635601

  6. Department of Energy's second-year implementation of the Federal Managers' Financial Integrity Act

    SciTech Connect

    Not Available

    1985-10-17

    GAO reviewed the implementation of the Federal Managers' Financial Integrity Act of 1982 by 23 federal departments and agencies. The act was intended to help reduce fraud, waste, and abuse in federal government operations by requiring agencies to assess and report annually to the President and the Congress on the adequacy of their internal controls and accounting systems. This report highlights the progress made and problems encountered by the Department of Energy (DOE) during its second year under the act. GAO evaluated DOE's efforts to correct internal control weaknesses and improve its accounting systems. GAO discusses ways in which DOE can strengthen its internal control and accounting system evaluations.

  7. NASA-Langley Research Center's Aircraft Condition Analysis and Management System Implementation

    NASA Technical Reports Server (NTRS)

    Frye, Mark W.; Bailey, Roger M.; Jessup, Artie D.

    2004-01-01

    This document describes the hardware implementation design and architecture of Aeronautical Radio Incorporated (ARINC)'s Aircraft Condition Analysis and Management System (ACAMS), which was developed at NASA-Langley Research Center (LaRC) for use in its Airborne Research Integrated Experiments System (ARIES) Laboratory. This activity is part of NASA's Aviation Safety Program (AvSP), the Single Aircraft Accident Prevention (SAAP) project to develop safety-enabling technologies for aircraft and airborne systems. The fundamental intent of these technologies is to allow timely intervention or remediation to improve unsafe conditions before they become life threatening.

  8. Daily Planet Redesign: eZ Publish Web Content Management Implementation

    NASA Technical Reports Server (NTRS)

    Dutra, Jayne E.

    2006-01-01

    This viewgraph presentation reviews the process of the redesign of the Daily . Planet news letter as a content management implementation project. This is a site that is an internal news site that acts as a communication vehicle for a large volume of content. The Objectives for the site redesign was: (1) Clean visual design, (2) Facilitation of publication processes, (3) More efficient maintenance mode, (4) Automated publishing to internal portal, (5) Better navigation through improved site IA, (6) Archiving and retrieval functionality, (7) Back to basics on fundamental business goals. The CM is a process not a software package

  9. Implementation of a Clinical Decision Support Alert for the Management of Clostridium difficile Infection

    PubMed Central

    Revolinski, Sara

    2015-01-01

    Clostridium difficile infections are common in hospitalized patients and can result in significant morbidity and mortality. It is imperative to optimize the management of C. difficile infections to help minimize disease complications. Antimicrobial stewardship techniques including guidelines, order sets and other clinical decision support functionalities may be utilized to assist with therapy optimization. We implemented a novel alert within our electronic medical record to direct providers to the C. difficile order set in order to assist with initiating therapy consistent with institutional guideline recommendations. The alert succeeded in significantly increasing order set utilization, but guideline compliance was unchanged. PMID:27025646

  10. Institutional Control Policies and Implementation for the Area 5 and Area 3 Radioactive Waste Management Sites

    SciTech Connect

    Vefa Yucel, Greg Shott, Denise Wieland, et al.

    2007-11-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has implemented varying institutional control policies in performance assessment/composite analysis (PA/CA) calculations for the Area 5 and Area 3 Radioactive Waste Management Sites (RWMSs) (Shott et al., 1998; 2000; Bechtel Nevada [BN] and Neptune and Company Inc. [Neptune], 2006). The facilities are within the actively maintained boundaries of the Nevada Test Site (NTS) that are enforced by NNSA/NSO. Under current policies, access required for exposure of the member of public (MOP) or the inadvertent human intruder (IHI) is prohibited. Uncertainties affecting institutional control policies are the duration and effectiveness of the controls during the post-closure period. Implementing a uniform set of institutional control policies for the RWMSs that encompasses waste management and environmental restoration programs and is consistent with the end-state vision for the environmental management programs for the NTS (DOE, 2006) is a primary goal of the maintenance program. The NNSA/NSO Performance Management Plan (DOE, 2002) complies with DOE Policy P455.1, 'Use of Risk-Based End States' (DOE, 2003a). Expected future land uses are a driver in selecting acceptable end state conditions and clean-up goals for the NTS. NNSA/NSO Environmental Management's (EM's) land management assumptions and framework for Environmental Management activities are as follows: The NTS will remain under federal control in perpetuity as an NNSA test site, and the large buffer zone surrounding the NTS (the Nevada Test and Training Range) is assumed to remain under the control of the U.S. Air Force. There are no plans for transfer of any NTS lands to other agencies or public entities. Access will continue to be restricted to the NTS and the surrounding areas. For management purposes, NNSA/NV EM activities have been established based on the source of contamination and type of waste

  11. Dentist-implemented contingent escape for management of disruptive child behavior.

    PubMed

    Allen, K D; Loiben, T; Allen, S J; Stanley, R T

    1992-01-01

    We evaluated the effectiveness of a dentist-implemented intervention in which brief escape from dental treatment was provided to manage disruptive child behavior during restorative dental treatment. Within a multiple baseline design across subjects, 4 children, aged 3 to 7 years, were provided temporary escape from dental treatment contingent upon brief periods of cooperative behavior. Disruptive behavior decreased when the appropriate escape contingency was used at least 80% of the time. The escape contingency required no more time than traditional management procedures (e.g., tell-show-do, reprimands and loud commands, restraint) to bring disruptive behavior under control. Independent ratings by two dentists provided social validation of the efficacy of the escape contingency. PMID:1429316

  12. Implementing natural resources management policy in Africa: A document and literature review

    SciTech Connect

    Brinkerhoff, D.W.; Gage, J.D.; Yeager, J.A.

    1992-04-01

    The organizational and management tasks involved in implementing natural resource management (NRM) policy in Africa are examined in the desk study. There are two main chapters. The first reviews 19 A.I.D. projects and programs in forestry/agroforestry, sustainable agriculture, and protected areas/biodiversity conservation in Africa. The study also identifies several troublesome features of NRM policies: the underlying contradiction between sustainable NRM and the prevailing economic development paradigm; the nature of NRM costs and benefits; the negative orientation of NRM regulations; and the tendency of NRM issues to generate conflict. A final section presents a set of strategic questions as a way to begin clarifying the complexity and multiplicity of factors and linkages that characterize NRM.

  13. Implementation of system intelligence in a 3-tier telemedicine/PACS hierarchical storage management system

    NASA Astrophysics Data System (ADS)

    Chao, Woodrew; Ho, Bruce K. T.; Chao, John T.; Sadri, Reza M.; Huang, Lu J.; Taira, Ricky K.

    1995-05-01

    Our tele-medicine/PACS archive system is based on a three-tier distributed hierarchical architecture, including magnetic disk farms, optical jukebox, and tape jukebox sub-systems. The hierarchical storage management (HSM) architecture, built around a low cost high performance platform [personal computers (PC) and Microsoft Windows NT], presents a very scaleable and distributed solution ideal for meeting the needs of client/server environments such as tele-medicine, tele-radiology, and PACS. These image based systems typically require storage capacities mirroring those of film based technology (multi-terabyte with 10+ years storage) and patient data retrieval times at near on-line performance as demanded by radiologists. With the scaleable architecture, storage requirements can be easily configured to meet the needs of the small clinic (multi-gigabyte) to those of a major hospital (multi-terabyte). The patient data retrieval performance requirement was achieved by employing system intelligence to manage migration and caching of archived data. Relevant information from HIS/RIS triggers prefetching of data whenever possible based on simple rules. System intelligence embedded in the migration manger allows the clustering of patient data onto a single tape during data migration from optical to tape medium. Clustering of patient data on the same tape eliminates multiple tape loading and associated seek time during patient data retrieval. Optimal tape performance can then be achieved by utilizing the tape drives high performance data streaming capabilities thereby reducing typical data retrieval delays associated with streaming tape devices.

  14. Development and Implementation of a Telehealth-Enhanced Intervention for Pain and Symptom Management

    PubMed Central

    Eaton, Linda H.; Gordon, Debra B.; Wyant, Sheryl; Theodore, Brian R.; Meins, Alexa R.; Rue, Tessa; Towle, Cara; Tauben, David; Doorenbos, Ardith Z.

    2014-01-01

    Managing chronic pain effectively is often challenging for health care providers and patients. Telehealth technologies can bridge geographic distance and improve patients' quality of care in communities where access to pain specialists has previously been unavailable. This paper describes the development and evaluation of a telehealth intervention (TelePain) designed to address the need for pain specialist consultation regarding pain and symptom management issues in non-academic medical centers. We describe the theoretical foundation and development of a multifaceted intervention using a cluster randomized clinical trial design. Health care providers and their patients with chronic pain are enrolled in the study. Patient participants receive the intervention (report of symptoms and receipt of a pain graph) weekly for 8 weeks and are contacted at 12 weeks for completion of post-intervention follow-up measures. Their providers attend Telepain sessions which involve a didactic presentation on an evidence-based topic related to pain management followed by patient case presentations and discussion by community clinicians. Symptom management recommendations for each patient case are made by a panel of pain specialists representing internal medicine, addiction medicine, rehabilitation medicine, anesthesiology, psychiatry, and nursing. The outcomes assessed in this randomized trial focus on pain intensity, pain's interference on function and sleep, and anxiety, depression, and cost-effectiveness. Some of the challenges and lessons that we have learned early in implementing the TelePain intervention are also reported. PMID:24846620

  15. Quality management series. How we implemented TQM in our laboratory and our blood bank.

    PubMed

    Beesley, J; Helton, H D; Merkley, A; Swalberg, E D

    1993-01-01

    Our experience in laboratory and blood services at LDS Hospital within Intermountain Health Care (IHC) is evidence that the theories behind total quality management (TQM) can be implemented into daily work. Some of the changes and results we have seen are increased employee accountability, paradigm shifts, process improvements, assessment using tools and measurement, increased customer and employee satisfaction, and cost savings. Some areas of the new TQM culture that we have focused on and made tremendous strides in are education in continuous quality improvement (CQI), CQI teams, quality councils, vision setting, self-managed work groups, change of management style, and celebrating success. We have learned that changes in culture take time and patience; managers must be willing to change their style; the CQI process and tools must be used; building trust and aligning values are important; education is key; making mistakes is how we learn; a customer focus is vital; significant change follows finding root causes; and we must just do it and not worry about all the little details. To make the change to a TQM culture, an organization must have faith in its employees, educate them, and be customer focused! PMID:10126513

  16. Development and implementation of a telehealth-enhanced intervention for pain and symptom management.

    PubMed

    Eaton, Linda H; Gordon, Debra B; Wyant, Sheryl; Theodore, Brian R; Meins, Alexa R; Rue, Tessa; Towle, Cara; Tauben, David; Doorenbos, Ardith Z

    2014-07-01

    Managing chronic pain effectively is often challenging for health care providers and patients. Telehealth technologies can bridge geographic distance and improve patients' quality of care in communities where access to pain specialists has previously been unavailable. This paper describes the development and evaluation of a telehealth intervention (TelePain) designed to address the need for pain specialist consultation regarding pain and symptom management issues in non-academic medical centers. We describe the theoretical foundation and development of a multifaceted intervention using a cluster randomized clinical trial design. Health care providers and their patients with chronic pain are enrolled in the study. Patient participants receive the intervention (report of symptoms and receipt of a pain graph) weekly for 8 weeks and are contacted at 12 weeks for completion of post-intervention follow-up measures. Their providers attend TelePain sessions which involve a didactic presentation on an evidence-based topic related to pain management followed by patient case presentations and discussion by community clinicians. Symptom management recommendations for each patient case are made by a panel of pain specialists representing internal medicine, addiction medicine, rehabilitation medicine, anesthesiology, psychiatry, and nursing. The outcomes assessed in this randomized trial focus on pain intensity, pain's interference on function and sleep, and anxiety, depression, and cost-effectiveness. Some of the challenges and lessons that we have learned early in implementing the TelePain intervention are also reported. PMID:24846620

  17. Evaluation and review of the safety management system implementation in the Royal Thai Air Force

    NASA Astrophysics Data System (ADS)

    Chaiwan, Sakkarin

    This study was designed to determine situation and effectiveness of the safety management system currently implemented in the Royal Thai Air Force. Reviewing the ICAO's SMS and the RTAF's SMS was conducted to identify similarities and differences between the two safety management systems. Later, the researcher acquired safety statistics from the RTAF Safety Center to investigate effectiveness of its safety system. The researcher also collected data to identify other factors affecting effectiveness of the safety system during conducting in-depth interviews. Findings and Conclusions: The study shows that the Royal Thai Air Force has never applied the International Civil Aviation Organization's Safety management System to its safety system. However, the RTAF's SMS and the ICAO's SMS have been developed based on the same concepts. These concepts are from Richard H. Woods's book, Aviation safety programs: A management handbook. However, the effectiveness of the Royal Thai Air Force's safety system is in good stance. An accident rate has been decreasing regularly but there are no known factors to describe the increasing rate, according to the participants' opinion. The participants have informed that there are many issues to be resolved to improve the RTAF's safety system. Those issues are cooperation among safety center's staffs, attitude toward safety of the RTAF senior commanders, and safety standards.

  18. Hybrid Electric Vehicle Power Management Solutions Based on Isolated and Non-Isolated Configurations of MMCCC Converter

    SciTech Connect

    Khan, Faisal H; Tolbert, Leon M; Webb, William E

    2009-01-01

    This paper presents the various configurations of a multilevel modular capacitor-clamped converter (MMCCC), and it reveals many useful and new formations of the original MMCCC for transferring power in either an isolated or nonisolated manner. The various features of the original MMCCC circuit are best suited for a multibus system in future plug-in hybrid or fuel-cell-powered vehicles' drive train. The original MMCCC is capable of bidirectional power transfer using multilevel modular structure with capacitor-clamped topology. It has a nonisolated structure, and it offers very high efficiency even at partial loads. This circuit was modified to integrate single or multiple high-frequency transformers by using the intermediate voltage nodes of the converter. On the other hand, a special formation of the MMCCC can exhibit dc outputs offering limited isolation without using any isolation transformer. This modified version can produce a high conversion ratio from a limited number of components and has several useful applications in providing power to multiple low-voltage loads in a hybrid or electric automobile. This paper will investigate the origin of generating ac outputs from the MMCCC and shows how the transformer-free version can be modified to create limited isolation from the circuit. In addition, this paper will compare various modified forms of the MMCCC topology with existing dc-dc converter circuits from compactness and component utilization perspectives.

  19. Constraints to implementing an equity-promoting staff allocation policy: understanding mid-level managers' and nurses' perspectives affecting implementation in South Africa.

    PubMed

    Scott, Vera; Mathews, Verona; Gilson, Lucy

    2012-03-01

    Much of current research on issues of equity in low- and middle-income countries focuses on uncovering and describing the extent of inequities in health status and health service provision. In terms of policy responses to inequity, there is a growing body of work on resource reallocation strategies. However, little published work exists on the challenges of implementing new policies intended to improve equity in health status or health service delivery. While the appropriateness of the technical content of policies clearly influences whether or not they promote equity, policy analysis theory suggests that it is important to consider how the processes of policy development and implementation influence policy achievements. Drawing on actor analysis and implementation theory, we seek to understand some of the dynamics surrounding the proposed implementation of one set of South African staff allocation strategies responding to broader equity-oriented policy mandates. These proposals were developed by a team of researchers and mid-level managers in 2003 and called for the reallocation of staff between better- and lesser-resourced districts in the Cape Town Metropolitan region to reduce broader resource allocation inequities. This was felt necessary because up to 70% of public health expenditure was on staff, and new financing for health care was unavailable. We focus on the views and reactions of the two sets of implementing actors most directly influenced by the proposed staff reallocation strategies: district health managers and clinic nurses. One strength of this analysis is that it gives voice to the experience of the district level--the key but much neglected implementation arena in a decentralized health system. The paper's findings unpack differences in these actors' positions on the proposed strategies, and explore the factors influencing their positions. Ultimately, we show how a lack of trust in the relationships between mid-level managers and nurse service

  20. Healthcare Managers' Experiences of Leading the Implementation of Video Conferencing in Discharge Planning Sessions: An Interview Study.

    PubMed

    Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel

    2016-03-01

    This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation. PMID:26825031

  1. Extent of Implementing the Total Quality Management Principles by Academic Departments Heads at Najran University from Faculty Members' Perspectives

    ERIC Educational Resources Information Center

    Al-Din, Hesham Moustafa Kamal; Abouzid, Mohamed Mahmoud

    2016-01-01

    This study aimed to identify the implementing degree of Total Quality Management (TQM) principals by Academic Departmental Heads (ADH) at the Najran University from faculty members' perspectives. It also aimed to determine significant differences between the average estimate of sample section of faculty members about the implementing degree of TQM…

  2. Class D Management Implementation Approach of the First Orbital Mission of the Earth Venture Series

    NASA Technical Reports Server (NTRS)

    Wells, James E.; Scherrer, John; Law, Richard; Bonniksen, Chris

    2013-01-01

    A key element of the National Research Council's Earth Science and Applications Decadal Survey called for the creation of the Venture Class line of low-cost research and application missions within NASA (National Aeronautics and Space Administration). One key component of the architecture chosen by NASA within the Earth Venture line is a series of self-contained stand-alone spaceflight science missions called "EV-Mission". The first mission chosen for this competitively selected, cost and schedule capped, Principal Investigator-led opportunity is the CYclone Global Navigation Satellite System (CYGNSS). As specified in the defining Announcement of Opportunity, the Principal Investigator is held responsible for successfully achieving the science objectives of the selected mission and the management approach that he/she chooses to obtain those results has a significant amount of freedom as long as it meets the intent of key NASA guidance like NPR 7120.5 and 7123. CYGNSS is classified under NPR 7120.5E guidance as a Category 3 (low priority, low cost) mission and carries a Class D risk classification (low priority, high risk) per NPR 8705.4. As defined in the NPR guidance, Class D risk classification allows for a relatively broad range of implementation strategies. The management approach that will be utilized on CYGNSS is a streamlined implementation that starts with a higher risk tolerance posture at NASA and that philosophy flows all the way down to the individual part level.

  3. Implementation of WHO guidelines on management of severe malnutrition in hospitals in Africa.

    PubMed Central

    Deen, Jacqueline L.; Funk, Matthias; Guevara, Victor C.; Saloojee, Haroon; Doe, James Y.; Palmer, Ayo; Weber, Martin W.

    2003-01-01

    OBJECTIVE: To investigate the problems, benefits, feasibility, and sustainability of implementation of WHO guidelines on management of severe malnutrition. METHODS: A postal survey invited staff from 12 African hospitals to participate in the study. Five hospitals were evaluated and two were selected to take part in the study: a district hospital in South Africa and a mission hospital in Ghana. At an initial visit, an experienced paediatrician reviewed the situation in the hospitals and introduced the principles of the guidelines through a participatory approach. During a second visit about six months later, the paediatrician reviewed the feasibility and sustainability of the introduced changes and helped find solutions to problems. At a final visit after one year, the paediatrician reassessed the overall situation. FINDINGS: Malnutrition management practices improved at both hospitals. Measures against hypoglycaemia, hypothermia, and infection were strengthened. Early, frequent feeding was established as a routine practice. Some micronutrients for inclusion in the diet were not locally available and needed to be imported. Problems were encountered with monitoring of weight gain and introducing a rehydration solution for malnutrition. CONCLUSION: Implementation of the main principles of the WHO guidelines on severe malnutrition was feasible, affordable, and sustainable at two African hospitals. The guidelines could be improved by including suggestions on how to adapt specific recommendations to local situations. The guidelines are well supported by experience and published reports, but more information is needed about some components and their impact on mortality. PMID:12764489

  4. Implementation of a platform dedicated to the biomedical analysis terminologies management

    PubMed Central

    Cormont, Sylvie; Vandenbussche, Pierre-Yves; Buemi, Antoine; Delahousse, Jean; Lepage, Eric; Charlet, Jean

    2011-01-01

    Background and objectives. Assistance Publique - Hôpitaux de Paris (AP-HP) is implementing a new laboratory management system (LMS) common to the 12 hospital groups. First step to this process was to acquire a biological analysis dictionary. This dictionary is interfaced with the international nomenclature LOINC, and has been developed in collaboration with experts from all biological disciplines. In this paper we describe in three steps (modeling, data migration and integration/verification) the implementation of a platform for publishing and maintaining the AP-HP laboratory data dictionary (AnaBio). Material and Methods. Due to data complexity and volume, setting up a platform dedicated to the terminology management was a key requirement. This is an enhancement tackling identified weaknesses of previous spreadsheet tool. Our core model allows interoperability regarding data exchange standards and dictionary evolution. Results. We completed our goals within one year. In addition, structuring data representation has lead to a significant data quality improvement (impacting more than 10% of data). The platform is active in the 21 hospitals of the institution spread into 165 laboratories. PMID:22195205

  5. Class D management implementation approach of the first orbital mission of the Earth Venture series

    NASA Astrophysics Data System (ADS)

    Wells, James E.; Scherrer, John; Law, Richard; Bonniksen, Chris

    2013-09-01

    A key element of the National Research Council's Earth Science and Applications Decadal Survey called for the creation of the Venture Class line of low-cost research and application missions within NASA (National Aeronautics and Space Administration). One key component of the architecture chosen by NASA within the Earth Venture line is a series of self-contained stand-alone spaceflight science missions called "EV-Mission". The first mission chosen for this competitively selected, cost and schedule capped, Principal Investigator-led opportunity is the CYclone Global Navigation Satellite System (CYGNSS). As specified in the defining Announcement of Opportunity, the Principal Investigator is held responsible for successfully achieving the science objectives of the selected mission and the management approach that he/she chooses to obtain those results has a significant amount of freedom as long as it meets the intent of key NASA guidance like NPR 7120.5 and 7123. CYGNSS is classified under NPR 7120.5E guidance as a Category 3 (low priority, low cost) mission and carries a Class D risk classification (low priority, high risk) per NPR 8705.4. As defined in the NPR guidance, Class D risk classification allows for a relatively broad range of implementation strategies. The management approach that will be utilized on CYGNSS is a streamlined implementation that starts with a higher risk tolerance posture at NASA and that philosophy flows all the way down to the individual part level.

  6. Implementation of a solvent management program to control paint shop volatile organic compounds

    SciTech Connect

    Floer, M.M.; Hicks, B.H.

    1997-12-31

    The majority of automobile assembly plant volatile organic compound (VOC) emissions are generated from painting operations. Typical paint operations generate more than 90 percent of the total plant emissions and, up to, 50 percent can be released by cleaning sources. Plant practices which contribute to the release of VOC emissions include the cleaning of paint lines and equipment, tanks, spray booths, floors and vehicles. Solvents continue to be the largest contributing source of VOC emissions in an automotive paint shop. To reduce overall VOC emissions, environmental regulations and guidelines were introduced under the Clean Air Act; Pollution Prevention and Waste Minimization programs, Control Techniques, and special air permit conditions. The introduction of these regulations and guidelines has driven industry toward continual refinement of their present cleaning methods while pursuing new techniques and technologies. Industry has also shown a proactive approach by introducing new waterborne and powder coating paint technologies to reduce overall emissions. As new paint technologies are developed and introduced, special attention must be given to the types of materials utilized for cleaning. The development and implementation of a solvent management program allows a facility to standardize a program to properly implement materials, equipment, technologies and work practices to reduce volatile organic compound emissions, meet strict cleaning requirements posed by new paint technologies and produce a vehicle which meets the high quality standards of the customer. This paper will assess the effectiveness of a solvent management program by examining pollution prevention initiatives and data from four different painting operations.

  7. Implementation of the Integrated Management of Childhood Illnesses strategy: challenges and recommendations in Botswana

    PubMed Central

    Mupara, Lucia U.; Lubbe, Johanna C.

    2016-01-01

    Background Under-five mortality has been a major public health challenge from time immemorial. In response to this challenge, the World Health Organization and the United Nations Children's Fund developed the Integrated Management of Childhood Illnesses (IMCI) strategy and presented it to the whole world as a key approach to reduce child morbidity and mortality. Botswana started to implement the IMCI strategy in 1998. Reductions in the under-five mortality rate (U5MR) have been documented, although the reduction is not on par with the expected Millennium Development Goal 4 predictions. Design A quantitative study was done to identify the problems IMCI implementers face when tending children under 5 years in the Gaborone Health District of Botswana. The study population was made up of all the IMCI-trained and registered nurses, and systematic sampling was used to randomly select study participants. Questionnaires were used to collect data. Results The study findings indicated challenges related to low training coverage, health systems, and the unique features of the IMCI strategy. Conclusions The comprehensive implementation of the IMCI strategy has the potential to significantly influence the U5MR in Botswana. PMID:26899774

  8. Nationwide implementation of integrated community case management of childhood illness in Rwanda

    PubMed Central

    Mugeni, Catherine; Levine, Adam C; Munyaneza, Richard M; Mulindahabi, Epiphanie; Cockrell, Hannah C; Glavis-Bloom, Justin; Nutt, Cameron T; Wagner, Claire M; Gaju, Erick; Rukundo, Alphonse; Habimana, Jean Pierre; Karema, Corine; Ngabo, Fidele; Binagwaho, Agnes

    2014-01-01

    ABSTRACT Background: Between 2008 and 2011, Rwanda introduced integrated community case management (iCCM) of childhood illness nationwide. Community health workers in each of Rwanda's nearly 15,000 villages were trained in iCCM and equipped for empirical diagnosis and treatment of pneumonia, diarrhea, and malaria; for malnutrition surveillance; and for comprehensive reporting and referral services. Methods: We used data from the Rwanda health management information system (HMIS) to calculate monthly all-cause under-5 mortality rates, health facility use rates, and community-based treatment rates for childhood illness in each district. We then compared a 3-month baseline period prior to iCCM implementation with a seasonally matched comparison period 1 year after iCCM implementation. Finally, we compared the actual changes in all-cause child mortality and health facility use over this time period with the changes that would have been expected based on baseline trends in Rwanda. Results: The number of children receiving community-based treatment for diarrhea and pneumonia increased significantly in the 1-year period after iCCM implementation, from 0.83 cases/1,000 child-months to 3.80 cases/1,000 child-months (P = .01) and 0.25 cases/1,000 child-months to 5.28 cases/1,000 child-months (P<.001), respectively. On average, total under-5 mortality rates declined significantly by 38% (P<.001), and health facility use declined significantly by 15% (P = .006). These decreases were significantly greater than would have been expected based on baseline trends. Conclusions: This is the first study to demonstrate decreases in both child mortality and health facility use after implementing iCCM of childhood illness at a national level. While our study design does not allow for direct attribution of these changes to implementation of iCCM, these results are in line with those of prior studies conducted at the sub-national level in other low-income countries. PMID:25276592

  9. Assessment of implementation of integrated management of neonatal and childhood illness in India.

    PubMed

    Mohan, Pavitra; Kishore, Baya; Singh, Sharad; Bahl, Rajiv; Puri, Anju; Kumar, Rajesh

    2011-12-01

    At the current rate of decline in infant mortality, India is unlikely to achieve the Millennium Development Goal on child survival. Integrated Management of Neonatal and Childhood Illness (IMNCI), adapted from the global Integrated Management of Childhood Illness to enhance the focus on newborns and on community health workers, is the central strategy within the National Reproductive and Child Health Programme to address high infant mortality. This paper assessed the progress of IMNCI in India, identified the programme bottlenecks, and also assessed the effect on coverage of key newborn and childcare practices. Programme data were analyzed to ascertain the implementation status; rapid programme assessment was conducted for identifying the programme bottlenecks; and results of analysis of two rounds of district-level household surveys were used for comparing the change in the coverage of child-health interventions in IMNCI and control districts. More than 200,000 community health workers and first-level healthcare providers were trained during 2005-2009 at a variable pace across 223 districts. Of the reported births (n = 1,102,573), 65.5% were visited by a trained worker within 24 hours, and 63.1% were visited three times within 10 days. Poor supervision and inadequate essential supplies affected the performance of trained workers. During 2004-2008, 12 early-implementing districts had covered most key newborn and child practice indicators compared to the control districts; however, the difference was significant only for care-seeking for acute respiratory infection (net difference: 17.8%; 95% confidence interval 2.3-33.2, p < 0.026). Based on the early experience of IMNCI implementation in different states of India, measures need to be taken to improve supportive supervision, availability of essential supplies, and monitoring of the programme if the strategy has to translate into improved child survival in India. PMID:22283037

  10. Implementing the Corrective Action Management Unit at Sandia National Laboratories, New Mexico

    SciTech Connect

    MOORE,DARLENE R.; SCHRADER,SCOTT A.; KING,GABRIEL G.; CORMIER,JOHN

    2000-01-26

    In September 1997, following significant public and regulator interaction, Sandia Corporation (Sandia) was granted a Resource Conservation and Recovery Act (RCRA) and Hazardous Solid Waste Amendment (HSWA) permit modification allowing construction and operation of a Correction Action Management Unit (CAMU). The CAMU follows recent regulatory guidance that allows for cost-effective, expedient cleanup of contaminated sites and management of hazardous remediation wastes. The CAMU was designed to store, treat, and provide long-term management for Environmental Restoration (ER) derived wastes. The 154 square meter CAMU site at Sandia National Laboratories, New Mexico (SNL/NM), includes facilities for storing bulk soils and containerized wastes, for treatment of bulk soils, and has a containment cell for long-term disposition of waste. Proposed treatment operations include soil washing and low temperature thermal desorption. The first waste was accepted into the CAMU for temporary storage in January 1999. Construction at the CAMU was completed in March 1999, and baseline monitoring of the containment cell has commenced. At completion of operations the facility will be closed, the waste containment cell will be covered, and long-term post-closure monitoring will begin. Sandia's CAMU is the only such facility within the US Department of Energy (DOE) complex. Implementing this innovative approach to ER waste management has required successful coordination with community representatives, state and federal regulators, the DOE, Sandia corporate management, and contractors. It is expected that cost savings to taxpayers will be significant. The life-cycle CAMU project cost is currently projected to be approximately $12 million.

  11. Temporal changes in the configuration of the water table in the vicinity of the management systems evaluation area site, central Nebraska

    USGS Publications Warehouse

    Kilpatrick, John M.

    1996-01-01

    To improve understanding of the hydrologic characteristics of the shallow aquifer in the vicinity of the Management Systems Evaluation Area site near Shelton, Nebraska, water levels were measured in approximately 130 observation wells in both June and September 1991. Two water-table maps and a water-level-change map were drawn on the basis of these measurements. In addition, historical data from U.S. Geological Survey computer files and published reports were used to determine the approximate configuration of the water table in 1931 and to draw one short-term and two-long term water- level hydrographs. Comparison of the three water- table maps indicates general similarities. The average horizontal hydraulic gradient in the shallow aquifer is about 7.5 feet per mile, and the flow direction is to the east-northeast. The water table declined 2 to 10 feet between June and September 1991, with the greatest decline occurring in a wedge-shaped area south of the Wood River and north of the Platte River. The 1991 water-table configurations appear to indicate that the aquifer either was discharging to the Platte River in this reach or there was little flow between the river and the aquifer. Comparison of the 1931 and 1991 water-table maps indicates that, except for short-term variations, the water-table configuration changed little during this 61-year period. Two long-term water-level hydrographs confirm this conclusion, indicating that the shallow aquifer in this area has been in long-term, dynamic equilibrium.

  12. Medication supply chain management through implementation of a hospital pharmacy computerized inventory program in Haiti

    PubMed Central

    Holm, Michelle R.; Rudis, Maria I.; Wilson, John W.

    2015-01-01

    Background In the aftermath of the 2010 earthquake in Haiti, St. Luke Hospital was built to help manage the mass casualties and subsequent cholera epidemic. A major problem faced by the hospital system was the lack of an available and sustainable supply of medications. Long-term viability of the hospital system depended largely on developing an uninterrupted medication supply chain. Objective We hypothesized that the implementation of a new Pharmacy Computerized Inventory Program (PCIP) would optimize medication availability and decrease medication shortages. Design We conducted the research by examining how medications were being utilized and distributed before and after the implementation of PCIP. We measured the number of documented medication transactions in both Phase 1 and Phase 2 as well as user logins to determine if a computerized inventory system would be beneficial in providing a sustainable, long-term solution to their medication management needs. Results The PCIP incorporated drug ordering, filling the drug requests, distribution, and dispensing of the medications in multiple settings; inventory of currently shelved medications; and graphic reporting of ‘real-time’ medication usage. During the PCIP initiation and establishment periods, the number of medication transactions increased from 219.6 to 359.5 (p=0.055), respectively, and the mean logins per day increased from 24.3 to 31.5, p<0.0001, respectively. The PCIP allows the hospital staff to identify and order medications with a critically low supply as well as track usage for future medication needs. The pharmacy and nursing staff found the PCIP to be efficient and a significant improvement in their medication utilization. Conclusions An efficient, customizable, and cost-sensitive PCIP can improve drug inventory management in a simplified and sustainable manner within a resource-constrained hospital. PMID:25623613

  13. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion...

  14. Principal Leadership and School Culture with a School-Wide Implementation of Professional Crisis Management: A Redemptive v. Punitive Model

    ERIC Educational Resources Information Center

    Adams, Mark Thomas

    2013-01-01

    This qualitative study investigated the nature of the relationship between principal leadership and school culture within a school-wide implementation of Professional Crisis Management (PCM). PCM is a comprehensive and fully integrated system designed to manage crisis situations effectively, safely, and with dignity. While designed primarily to…

  15. "Not" a One-Size-Fits-All Solution: Lessons Learned from Implementing an Electronic Resources Management System in Three Days

    ERIC Educational Resources Information Center

    Pan, Denise

    2009-01-01

    Auraria Library purchased Innovative Interfaces, Inc.'s Millennium Electronic Resources Management (ERM) to manage data about acquisitions, licensing, troubleshooting, and usage statistics of electronic resources. After 3 days of implementation, the software vendor enabled resources records to display. As a result, the electronic resources team…

  16. Implementation of a Contingency Management-Based Intervention in a Community Supervision Setting: Clinical Issues and Recommendations

    ERIC Educational Resources Information Center

    Trotman, Adria J.; Taxman, Faye S.

    2011-01-01

    A cognitive-behaviorally based substance abuse treatment program was implemented within a community supervision setting. This program included a goals group that used a contingency management component and included the probation agent as a part of the treatment. In this article, the authors describe the contingency management component of the…

  17. Tools for beach health data management, data processing, and predictive model implementation

    USGS Publications Warehouse

    U.S. Geological Survey

    2013-01-01

    This fact sheet describes utilities created for management of recreational waters to provide efficient data management, data aggregation, and predictive modeling as well as a prototype geographic information system (GIS)-based tool for data visualization and summary. All of these utilities were developed to assist beach managers in making decisions to protect public health. The Environmental Data Discovery and Transformation (EnDDaT) Web service identifies, compiles, and sorts environmental data from a variety of sources that help to define climatic, hydrologic, and hydrodynamic characteristics including multiple data sources within the U.S. Geological Survey and the National Oceanic and Atmospheric Administration. The Great Lakes Beach Health Database (GLBH-DB) and Web application was designed to provide a flexible input, export, and storage platform for beach water quality and sanitary survey monitoring data to compliment beach monitoring programs within the Great Lakes. A real-time predictive modeling strategy was implemented by combining the capabilities of EnDDaT and the GLBH-DB for timely, automated prediction of beach water quality. The GIS-based tool was developed to map beaches based on their physical and biological characteristics, which was shared with multiple partners to provide concepts and information for future Web-accessible beach data outlets.

  18. An Evaluation and Implementation of Rule-Based Home Energy Management System Using the Rete Algorithm

    PubMed Central

    Fujita, Naotaka; Yoshihisa, Tomoki; Tsukamoto, Masahiko

    2014-01-01

    In recent years, sensors become popular and Home Energy Management System (HEMS) takes an important role in saving energy without decrease in QoL (Quality of Life). Currently, many rule-based HEMSs have been proposed and almost all of them assume “IF-THEN” rules. The Rete algorithm is a typical pattern matching algorithm for IF-THEN rules. Currently, we have proposed a rule-based Home Energy Management System (HEMS) using the Rete algorithm. In the proposed system, rules for managing energy are processed by smart taps in network, and the loads for processing rules and collecting data are distributed to smart taps. In addition, the number of processes and collecting data are reduced by processing rules based on the Rete algorithm. In this paper, we evaluated the proposed system by simulation. In the simulation environment, rules are processed by a smart tap that relates to the action part of each rule. In addition, we implemented the proposed system as HEMS using smart taps. PMID:25136672

  19. An evaluation and implementation of rule-based Home Energy Management System using the Rete algorithm.

    PubMed

    Kawakami, Tomoya; Fujita, Naotaka; Yoshihisa, Tomoki; Tsukamoto, Masahiko

    2014-01-01

    In recent years, sensors become popular and Home Energy Management System (HEMS) takes an important role in saving energy without decrease in QoL (Quality of Life). Currently, many rule-based HEMSs have been proposed and almost all of them assume "IF-THEN" rules. The Rete algorithm is a typical pattern matching algorithm for IF-THEN rules. Currently, we have proposed a rule-based Home Energy Management System (HEMS) using the Rete algorithm. In the proposed system, rules for managing energy are processed by smart taps in network, and the loads for processing rules and collecting data are distributed to smart taps. In addition, the number of processes and collecting data are reduced by processing rules based on the Rete algorithm. In this paper, we evaluated the proposed system by simulation. In the simulation environment, rules are processed by a smart tap that relates to the action part of each rule. In addition, we implemented the proposed system as HEMS using smart taps. PMID:25136672

  20. Development and implementation of an HSE management system in E and P companies

    SciTech Connect

    Bentley, P.D.; Mundhenk, D.L.; Jones, M.G.; Jong, G. de; Visser, J.P. )

    1995-01-01

    This paper describes the experience to date with safety management systems (SMS's) and describes their implementation after the Piper Alpha disaster and Lord Cullen's report. It also shows the gradual expansion of these systems toward fully integrated health, safety, and environment (HSE) management systems. The authors' company policy, which was clearly stated before publication of Lord Cullen's report, is that work should not start until the appropriate controls are in place. Work based on this policy and on objective-setting SMS's within Shell Intl. Petroleum Mij. (SIPM) E and P coordination started in earnest soon after the publication of the report in Nov. 1990 and has continued without interruption since that time. Objective-setting systems may be defined as systems where the company management sets its own objectives or goals on the basis of functional rather than prescriptive requirements and then goes on to demonstrate how such goals have been, or are being, met. The paper ends with a projection of what may be expected in the future.

  1. Implementation of a data management software system for SSME test history data

    NASA Technical Reports Server (NTRS)

    Abernethy, Kenneth

    1986-01-01

    The implementation of a software system for managing Space Shuttle Main Engine (SSME) test/flight historical data is presented. The software system uses the database management system RIM7 for primary data storage and routine data management, but includes several FORTRAN programs, described here, which provide customized access to the RIM7 database. The consolidation, modification, and transfer of data from the database THIST, to the RIM7 database THISRM is discussed. The RIM7 utility modules for generating some standard reports from THISRM and performing some routine updating and maintenance are briefly described. The FORTRAN accessing programs described include programs for initial loading of large data sets into the database, capturing data from files for database inclusion, and producing specialized statistical reports which cannot be provided by the RIM7 report generator utility. An expert system tutorial, constructed using the expert system shell product INSIGHT2, is described. Finally, a potential expert system, which would analyze data in the database, is outlined. This system could use INSIGHT2 as well and would take advantage of RIM7's compatibility with the microcomputer database system RBase 5000.

  2. Implementing EVM Data Analysis Adding Value from a NASA Project Manager's Perspective

    NASA Technical Reports Server (NTRS)

    Counts, Stacy; Kerby, Jerald

    2006-01-01

    Data Analysis is one of the keys to an effective Earned Value Management (EVM) Process. Project Managers (PM) must continually evaluate data in assessing the health of their projects. Good analysis of data can assist PMs in making better decisions in managing projects. To better support our P Ms, National Aeronautics and Space Administration (NASA) - Marshall Space Flight Center (MSFC) recently renewed its emphasis on sound EVM data analysis practices and processes, During this presentation we will discuss the approach that MSFC followed in implementing better data analysis across its Center. We will address our approach to effectively equip and support our projects in applying a sound data analysis process. In addition, the PM for the Space Station Biological Research Project will share her experiences of how effective data analysis can benefit a PM in the decision making process. The PM will discuss how the emphasis on data analysis has helped create a solid method for assessing the project s performance. Using data analysis successfully can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces

  3. Reducing diabetes disparities through the implementation of a community health worker-led diabetes self-management education program.

    PubMed

    Walton, James W; Snead, Christine A; Collinsworth, Ashley W; Schmidt, Kathryn L

    2012-01-01

    Disparities in prevalence of type 2 diabetes and complications in underserved populations have been linked to poor quality of care including lack of access to diabetes management programs. Interventions utilizing community health workers (CHWs) to assist with diabetes management have demonstrated improvements in patient outcomes. Use of CHWs may be an effective model for providing care coordination and reducing disparities, but there is limited knowledge on how to implement this model on a large scale. This article describes how an integrated health care system implemented a CHW-led diabetes self-management education program targeting Hispanic patients and reports lessons learned from the first 18 months of operation. PMID:22367263

  4. Managing symptoms during cancer treatments: evaluating the implementation of evidence-informed remote support protocols

    PubMed Central

    2012-01-01

    Background Management of cancer treatment-related symptoms is an important safety issue given that symptoms can become life-threatening and often occur when patients are at home. With funding from the Canadian Partnership Against Cancer, a pan-Canadian steering committee was established with representation from eight provinces to develop symptom protocols using a rigorous methodology (CAN-IMPLEMENT©). Each protocol is based on a systematic review of the literature to identify relevant clinical practice guidelines. Protocols were validated by cancer nurses from across Canada. The aim of this study is to build an effective and sustainable approach for implementing evidence-informed protocols for nurses to use when providing remote symptom assessment, triage, and guidance in self-management for patients experiencing symptoms while undergoing cancer treatments. Methods A prospective mixed-methods study design will be used. Guided by the Knowledge to Action Framework, the study will involve (a) establishing an advisory knowledge user team in each of three targeted settings; (b) assessing factors influencing nurses’ use of protocols using interviews/focus groups and a standardized survey instrument; (c) adapting protocols for local use, ensuring fidelity of the content; (d) selecting intervention strategies to overcome known barriers and implementing the protocols; (e) conducting think-aloud usability testing; (f) evaluating protocol use and outcomes by conducting an audit of 100 randomly selected charts at each of the three settings; and (g) assessing satisfaction with remote support using symptom protocols and change in nurses’ barriers to use using survey instruments. The primary outcome is sustained use of the protocols, defined as use in 75% of the calls. Descriptive analysis will be conducted for the barriers, use of protocols, and chart audit outcomes. Content analysis will be conducted on interviews/focus groups and usability testing with comparisons across

  5. A novel approach to implementing digital policy management as an enabler for a dynamic secure information sharing in a cloud environment

    NASA Astrophysics Data System (ADS)

    Farroha, Bassam S.; Essman, Kristine R.; Farroha, Deborah L.; Cohen, Andy

    2011-06-01

    The traditional way of approaching the management and enforcement of information systems Policy in enterprise environments is to manually translate laws and regulations into a form that can be interpreted and enforced by enterprise devices. In other words we create system commands for routers, bridges, and firewalls to force data transfers and system access to comply with the current policies and approved rules in order to control access and protect private, sensitive, and classified information. As operational needs and threat levels change, the rules are modified to accommodate the required response. It then falls on System Administrators to manually change the configuration of the devices they manage to adapt their operations accordingly. As our user communities continue to rely more heavily on mission information, and the enterprise systems and networks that provide it, our enterprise needs to progress to more automated techniques that enable authorized managers to dynamically update and manage policies in digital formats. Automated management of access rules that control privileges for accessing secure information and enterprise resources, enabled by Digital Policy and other Enterprise Security Management (ESM) capabilities provides the means for system administrators to dynamically respond to changing user needs, threat postures and other environmental factors. With the increased popularity of virtual environments and advent of cloud enterprise services, IA management concepts need to be reexamined. Traditional ESM solutions may be subjected to new classes of threats as physical control of the assets that implement those services are relinquished to virtual environments. Additional operational factors such as invoking critical processing, controlling access to information during processing, ensuring adequate protection of transactions within virtual environments and executing ESM provisions are also affected. The paper describes the relationships among

  6. Tool to address green roof widespread implementation effect in flood characteristics for water management planning

    NASA Astrophysics Data System (ADS)

    Tassi, R.; Lorenzini, F.; Allasia, D. G.

    2015-06-01

    In the last decades, new approaches were adopted to manage stormwater as close to its source as possible through technologies and devices that preserve and recreate natural landscape features. Green Roofs (GR) are examples of these devices that are also incentivized by city's stormwater management plans. Several studies show that GR decreases on-site runoff from impervious surfaces, however, the analysis of the effect of widespread implementation of GR in the flood characteristics at the urban basin scale in subtropical areas are little discussed, mainly because of the absence of data. Thereby, this paper shows results related to the monitoring of an extensive modular GR under subtropical weather conditions, the development of a rainfall-runoff model based on the modified Curve Number (CN) and SCS Triangular Unit Hydrograph (TUH) methods and the analysis of large-scale impact of GR by modelling different basins. The model was calibrated against observed data and showed that GR absorbed almost all the smaller storms and reduced runoff even during the most intense rainfall. The overall CN was estimated in 83 (consistent with available literature) with the shape of hydrographs well reproduced. Large-scale modelling (in basins ranging from 0.03 ha to several square kilometers) showed that the widespread use of GRs reduced peak flows (volumes) around 57% (48%) at source and 38% (32%) at the basin scale. Thus, this research validated a tool for the assessment of structural management measures (specifically GR) to address changes in flood characteristics in the city's water management planning. From the application of this model it was concluded that even if the efficiency of GR decreases as the basin scale increase they still provide a good option to cope with urbanization impact.

  7. Implementation of Risk Management Tools to improve Soil fertility in Ethiopian Agro Systems

    NASA Astrophysics Data System (ADS)

    García Moreno, Rosario; Ramos Fuentes, Natalia; Gameda, Samuel; Cruz Díaz Álvarez, M.; Selasie, Yihenew G.

    2013-04-01

    Agriculture is one of the activities with the highest degree of edaphoclimatic risk exposure in Ethiopia. The survival of 80The analysis showed that for most of the medium small farmers it is absolutely necessary the use of risk management tools to mitigate or prevent the consequences. A case that has been very interesting is the use of index insurance based on rain and temperature index as indicators of drought. But these projects have several limitations that make difficult its large-scale development. The main problem is to obtain meteorological data, both by the poor infrastructure and the lack of historical records in many parts of the country. The lack of a legal framework at a national level is also a great barrier for the development of these instruments. In addition, the need of further information on the knowledge and opinions of farmers is also fundamental, as well as the implementation of best soil management practices. The results of the project indicated the needs of obtaining information directed from producers, for that reason a questionnaire was developed according to universities working with the producers, introducing the need of doing a regular survey to get the basic information about the area where we plan to make management improvements. In any case, it was found that to get a better performance on the index insurance projects together with the introduction of best management practices at a large-scale, they must be accompanied by social protection programs. This project is financed by the Spanish Agency for International Development Cooperation (AECID), Ministry of Foreign Affairs and Cooperation, through the PCI funding AP/038205/11 and the economical support of the FES though the Program Angeles Alvariño 2013 of Xunta of Galicia

  8. Development and Implementation of Collaborative e-Infrastructures and Data Management for Global Change Research

    NASA Astrophysics Data System (ADS)

    Allison, M. Lee; Davis, Rowena

    2016-04-01

    An e-infrastructure that supports data-intensive, multidisciplinary research is needed to accelerate the pace of science to address 21st century global change challenges. Data discovery, access, sharing and interoperability collectively form core elements of an emerging shared vision of e-infrastructure for scientific discovery. The pace and breadth of change in information management across the data lifecycle means that no one country or institution can unilaterally provide the leadership and resources required to use data and information effectively, or needed to support a coordinated, global e-infrastructure. An 18-month long process involving ~120 experts in domain, computer, and social sciences from more than a dozen countries resulted in a formal set of recommendations that were adopted in fall, 2015 by the Belmont Forum collaboration of national science funding agencies and international bodies on what they are best suited to implement for development of an e-infrastructure in support of global change research, including: • adoption of data principles that promote a global, interoperable e-infrastructure, that can be enforced • establishment of information and data officers for coordination of global data management and e-infrastructure efforts • promotion of effective data planning and stewardship • determination of international and community best practices for adoption • development of a cross-disciplinary training curriculum on data management and curation The implementation plan is being executed under four internationally-coordinated Action Themes towards a globally organized, internationally relevant e-infrastructure and data management capability drawn from existing components, protocols, and standards. The Belmont Forum anticipates opportunities to fund additional projects to fill key gaps and to integrate best practices into an e-infrastructure to support their programs but that can also be scaled up and deployed more widely. Background

  9. Versatile composite amplifier configuration

    NASA Astrophysics Data System (ADS)

    Gift, Stephan J. G.; Maundy, Brent

    2015-06-01

    This paper describes a versatile composite amplifier in which a current feedback amplifier (CFA) drives an operational amplifier (OPA). In the conventional OPA-CFA composite amplifier, an OPA drives a CFA resulting in a composite structure that combines the DC input stability of the OPA and the high speed capability of the CFA. The proposed composite configuration combines different features of the CFA and OPA, specifically the constant bandwidth property of the CFA and the high power and high current output capacity of the OPA. The new circuit is easily implemented in the standard inverting and non-inverting configurations using commercially available devices, and the accuracy and constant bandwidth features were experimentally verified. Local feedback around the associated CFA ensures that the proposed composite amplifier possesses a higher level of bandwidth constancy than a single CFA.

  10. DOE organization and management approach in responding to recommendation 94-2 - The implementation plan

    SciTech Connect

    Widmayer, D.

    1995-12-31

    In March, the Department of Energy (DOE) submitted the Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-2, {open_quotes}Conformance with Safety Standards at Department of Energy Low-Level Nuclear Waste and Disposal Sites.{close_quotes} This paper discusses the management organization and interactions established to accomplish the tasks developed to respond to the DNFSB Recommendation. The organization of the tasks into six technical areas and the interfaces and connections between the tasks are briefly described. A summary of how each significant part of the DNFSB Recommendation is being addressed is presented. This paper provides a brief introduction to the remaining presentations in this session.

  11. Chronic Grief Management for Dementia Caregivers in Transition: Intervention Development and Implementation

    PubMed Central

    Paun, Olimpia; Farran, Carol J.

    2013-01-01

    Research reveals that Alzheimer’s disease (AD) caregivers (CGs) do not relinquish their role after placing a family member in long-term care. Caregivers report increased emotional upset around the time of placement, with sustained losses over time leading to chronic grief. Chronic grief increases caregivers’ risk for depression and suicide. There are no documented interventions designed to decrease CGs chronic grief post placement. The Chronic Grief Management Intervention (CGMI) builds on existing evidence to target caregiver chronic grief in the transition of a family member into long-term care. The intervention is structured into three major components: 1) knowledge, 2) skill in communication and conflict resolution, and 3) chronic grief mangement skill. The 12-week intervention was pilot tested with thirty four caregivers for feasibility and preliminary effects on caregiver skill, knowledge, chronic grief, and depression. This article presents a general study description while focusing on the development and implementation of the CGMI. PMID:22084962

  12. Challenges for quality management in implementation, maintenance, and sustainability of research tissue biobanks.

    PubMed

    Schmitt, S; Kynast, K; Schirmacher, P; Herpel, E

    2016-01-01

    Availability of high-quality human tissue samples and access to associated histopathological and clinical data is essential for basic and translational biomedical research, especially in areas of personalized medicine, drug, and biomarker development and mechanistically oriented biomedical research projects. Therefore, it is pivotal to establish and maintain quality-assured tissue biobanks that provide high-quality biomaterial to research thereby increasing the impact and reliability of scientific results. Quality concerns do not only address the biomaterial specimen itself but include all biobanking-related procedures. Tissue biobanks thus face essential challenges that encompass the implementation of adequate structural components, documentation of tissue sample collection and storage (procedures), as well as data and project management and IT. An integral and indispensable component of tissue biobanks is expert-driven evaluation (entry and exit controls) of tissue specimen to guarantee provision of high-quality assured biomaterials. PMID:26271995

  13. Implementation of a drug-use and disease-state management program.

    PubMed

    Skledar, S J; Hess, M M

    2000-12-15

    A drug-use and disease-state management (DUDSM) program was instituted in 1996 at a teaching hospital associated with a large nonprofit health care system. The program's goals are to optimize pharmacotherapeutic regimens, evaluate health outcomes of identified disease states, and evaluate the economic impact of pharmacotherapeutic options for given disease states by developing practice guidelines. Through a re-engineering process, resources within the pharmacy department were identified that could be devoted to the DUDSM program, including the use of clinical pharmacy specialists, promotion of staff pharmacists into the DUDSM program, a pharmacy technician, and information systems support. A strength of the program is its systematic approach for developing and implementing new initiatives, as well as monitoring compliance with all initiatives on an ongoing basis. The initiative-design process incorporates continuous quality improvement principles, outcome design and evaluation, competency assessment for all pharmacists, multidisciplinary collaboration, and sophisticated information systems. Seventy-five initiatives have been implemented, ranging from simple dose-optimization strategies for specific drugs to complicated practice guidelines for managing specific disease states. Improved patient outcomes have been documented, including reduced length of stay, postsurgical wound infection, adverse drug reactions, and medication errors. Documented cost savings exceeded $4 million annually for fiscal years 1996-97 through 1999-2000. Overall compliance with DUDSM initiatives exceeds 80%, and physician service profiling has been initiated to monitor variant prescribing. The DUDSM program has successfully integrated practice guidelines into therapeutic decision-making, resulting in improved patient-care outcomes and cost savings. PMID:11148941

  14. Importance of strategic management in the implementation of private medicine retailer programmes: case studies from three districts in Kenya

    PubMed Central

    2010-01-01

    Abstract Background The home-management of malaria strategy seeks to improve prompt and effective anti-malarial drug use through the informal sector, with a potential channel being the Private Medicine Retailers (PMRs). Previous evaluations of PMR programmes focused on their impact on retailer knowledge and practices, with limited evidence about the influence of implementation processes on the impacts at scale. This paper examines how the implementation processes of three PMR programmes in Kenya, each scaled up within a district, contributed to the outcomes observed. These were a Ministry of Health programme in Kwale district; and two programmes supported by non-governmental organizations in collaboration with government in Kisii Central and Bungoma districts. Methods The research methods included 24 focus group discussions with clients and PMRs, 19 in-depth interviews with implementing actors, document review and a diary of events. The data were analysed using the combination of a broad policy analysis framework and more specific scaling up/diffusion of innovations frameworks. Results The Kisii programme, a case study of successful implementation, was underpinned by good relationships between district health managers and a “resource team”, supported by a memorandum of understanding which enabled successful implementation. It had flexible budgetary and decision making processes which were responsive to local contexts, and took account of local socio-economic activities. In contrast, the Kwale programme, which had implementation challenges, was characterised by a complex funding process, with lengthy timelines, that was tied to the government financial management system which constrained implementation Although there was a flexible funding system in Bungoma, a perceived lack of transparency in fund management, inadequate management of inter-organisational relationships, and inability to adapt and respond to changing circumstances led to implementation

  15. Storage resource manager version 2.2: design, implementation, and testing experience

    NASA Astrophysics Data System (ADS)

    Donno, F.; Abadie, L.; Badino, P.; Baud, J.-P.; Corso, E.; Witt, S. D.; Fuhrmann, P.; Gu, J.; Koblitz, B.; Lemaitre, S.; Litmaath, M.; Litvintsev, D.; Presti, G. L.; Magnoni, L.; McCance, G.; Mkrtchan, T.; Mollon, R.; Natarajan, V.; Perelmutov, T.; Petravick, D.; Shoshani, A.; Sim, A.; Smith, D.; Tedesco, P.; Zappi, R.

    2008-07-01

    Storage Services are crucial components of the Worldwide LHC Computing Grid Infrastructure spanning more than 200 sites and serving computing and storage resources to the High Energy Physics LHC communities. Up to tens of Petabytes of data are collected every year by the four LHC experiments at CERN. To process these large data volumes it is important to establish a protocol and a very efficient interface to the various storage solutions adopted by the WLCG sites. In this work we report on the experience acquired during the definition of the Storage Resource Manager v2.2 protocol. In particular, we focus on the study performed to enhance the interface and make it suitable for use by the WLCG communities. At the moment 5 different storage solutions implement the SRM v2.2 interface: BeStMan (LBNL), CASTOR (CERN and RAL), dCache (DESY and FNAL), DPM (CERN), and StoRM (INFN and ICTP). After a detailed inside review of the protocol, various test suites have been written identifying the most effective set of tests: the S2 test suite from CERN and the SRM-Tester test suite from LBNL. Such test suites have helped verifying the consistency and coherence of the proposed protocol and validating existing implementations. We conclude our work describing the results achieved.

  16. Development and implementation of a pharmacist-managed inpatient anticoagulation monitoring program.

    PubMed

    Wellman, Jessica C; Kraus, Peggy S; Burton, Bradley L; Ensor, Christopher R; Nesbit, Todd W; Ross, Patricia A; Thomas, Michelle L; Streiff, Michael B

    2011-05-15

    PURPOSE. A stepwise approach to development and implementation of a program to standardize and increase pharmacists' involvement in anticoagulation therapy at a large academic medical center is described. SUMMARY. In response to the Joint Commission's national goal of improved patient safety in anticoagulation therapy, a work group of pharmacy administrators, educators, clinical specialists, and decentralized pharmacists at the hospital developed the structure for a comprehensive inpatient anticoagulation program (IAP); the work group also developed a list of required competencies, educational materials, assessment methods, and mechanisms for eliciting feedback from IAP pharmacists and other patient care staff. After completion of training that included structured case-review sessions, a one-on-one shadowing experience, and competency assessment, IAP pharmacists began reviewing clinical and laboratory data on patients receiving warfarin and low-molecular-weight heparins and providing recommendations to physicians, nurse practitioners, and other health care team members. Feedback from other clinicians was generally positive, with a majority of those surveyed indicating that increased pharmacist involvement in anticoagulation monitoring and dosage adjustment resulted in improved patient care; about 80% indicated that they concurred with pharmacists' recommendations at least 75% of the time. Results of a survey of IAP pharmacists indicated increased satisfaction with their daily duties but also a need for improved pharmacist-to-pharmacist communication. CONCLUSION. Case-based advanced training and implementation of an IAP in a tertiary care hospital increased pharmacists' involvement in the management of inpatients receiving anticoagulants. PMID:21546645

  17. Implementation Issues and Challenges for Computerized Clinical Protocols for Management of Mechanical Ventilation in ARDS Patients

    PubMed Central

    East, Thomas D.; Henderson, Susan; Morris, Alan H.; Gardner, Reed M.

    1989-01-01

    In the process of implementing complex computerized protocols for the management of ventilation in ARDS patients several unique problems were encountered in the areas of temporal dependency, testing, decision making architecture, data integrity, user interaction and order generation. The protocols are different from many of the applications previously developed in that they depend not only on the current status of the patient but the temporal sequence of events that led up to the present time. This necessitated timely charting which was not a small requirement in the demanding ICU environment. New testing tools had to be developed to simulate a temporal sequence of events so that all branches of the protocols could be thoroughly tested. The blackboard control architecture originally implemented had to be abandoned for the sake of data integrity. The inability to have interactive communication, during execution of the protocols required a thorough re-evaluation of the data which was routinely charted. The mechanism for triggering execution of the protocols had to be redesigned to provide shorter response time for the ICU environment. This new version of the protocols has been used in 16 patients for a total of 3553 therapy suggestions. It is now being generally accepted in the ICU and routinely used to treat a wide variety of respiratory failure patients.

  18. Design and Implementation of Surrounding Transaction Plotting and Management System Based on Google Map API

    NASA Astrophysics Data System (ADS)

    Cao, Y. B.; Hua, Y. X.; Zhao, J. X.; Guo, S. M.

    2013-11-01

    With China's rapid economic development and comprehensive national strength growing, Border work has become a long-term and important task in China's diplomatic work. How to implement rapid plotting, real-time sharing and mapping surrounding affairs has taken great significance for government policy makers and diplomatic staff. However, at present the already exists Boundary information system are mainly have problems of Geospatial data update is heavily workload, plotting tools are in a state of serious lack of, Geographic events are difficult to share, this phenomenon has seriously hampered the smooth development of the border task. The development and progress of Geographic information system technology especially the development of Web GIS offers the possibility to solve the above problems, this paper adopts four layers of B/S architecture, with the support of Google maps service, uses the free API which is offered by Google maps and its features of openness, ease of use, sharing characteristics, highresolution images to design and implement the surrounding transaction plotting and management system based on the web development technology of ASP.NET, C#, Ajax. The system can provide decision support for government policy makers as well as diplomatic staff's real-time plotting and sharing of surrounding information. The practice has proved that the system has good usability and strong real-time.

  19. Design and implementation of the standards-based personal intelligent self-management system (PICS).

    PubMed

    von Bargen, Tobias; Gietzelt, Matthias; Britten, Matthias; Song, Bianying; Wolf, Klaus-Hendrik; Kohlmann, Martin; Marschollek, Michael; Haux, Reinhold

    2013-01-01

    Against the background of demographic change and a diminishing care workforce there is a growing need for personalized decision support. The aim of this paper is to describe the design and implementation of the standards-based personal intelligent care systems (PICS). PICS makes consistent use of internationally accepted standards such as the Health Level 7 (HL7) Arden syntax for the representation of the decision logic, HL7 Clinical Document Architecture for information representation and is based on a open-source service-oriented architecture framework and a business process management system. Its functionality is exemplified for the application scenario of a patient suffering from congestive heart failure. Several vital signs sensors provide data for the decision support system, and a number of flexible communication channels are available for interaction with patient or caregiver. PICS is a standards-based, open and flexible system enabling personalized decision support. Further development will include the implementation of components on small computers and sensor nodes. PMID:23542984

  20. Private adaptation strategies and implementation in flood risk management: why people do nothing?

    NASA Astrophysics Data System (ADS)

    Karagiorgos, Konstantinos; Thaler, Thomas; Maris, Fotios; Paparrizos, Spyros; Fuchs, Sven

    2015-04-01

    In the past decades, vulnerability assessment has emerged as an important field of research in flood risk management, in particular with respect to climate change and necessary adaptation strategies for the society. Probably starting with Chamber's seminal article on vulnerability, coping and policy (Chambers 1989), and further developed as the causal structure of vulnerability by Bohle (2001) and others, at least two research paradigms exist: an internal side focusing on societal resilience and coping capacities, and an external side targeted at a reduction of negative effects in terms of loss reduction (Fuchs 2009). Despite considerable research effects, however, different definitions and concepts still dominate the debate; it is surely that different scientific disciplines are working with this term: natural scientists, engineers, social scientists or economists, to name just a few. Each discipline defines vulnerability in a way which fits to their disciplinary purposes (Fuchs et al. 2011). But why has there been so little progress in our ability to adapt to flood hazards? White et al. (2001) summarised this paradox in an article with the title "Knowing better and losing even more - the use of knowledge in hazard management". One of the fundamental reasons for the lack of progress is the continuing separation of research on natural processes and socio-economic processes without considering interaction between these systems (Fuchs & Keiler 2013), as well as between scientific research results and the policy implementation (Medd & Marvin 2005). Moreover, as many studies were focused on the vulnerability of least developed societies to natural hazards (O'Brien et al. 2008), there is a particular lack in studies targeted at an implementation of existing adaptation frameworks at the level of highly-developed countries (Field et al. 2012; Scolobig et al. 2012). This gap results in a challenge for attempts to develop formal models into practical application and policy