  1. The Hood River Story : Marketing a Conservation Project : Final Report.

    SciTech Connect

    Kaplon, Shellie

    1987-09-01

    This report presents the marketing efforts behind the Hood River Conservation Project (the Project). The Project was a research effort designed to identify and systematically document the effects and retrofit potential of conservation when rapidly implemented within a limited geographic area. Super-weatherization measures were installed in 85 percent of all qualified households at virtually no cost to the homeowner. The goals of the project were to determine the maximum penetration rate of weatherization participation and measures within a limited period of time; the relative effectiveness of various approaches to conservation marketing; the characteristics of community social interaction and impacts under maximum conservation conditions; the costs associated with the development and conduct of a maximum conservation effort; and the effects of conservation on distribution and transmission systems, load management, and savings. The purpose of this volume is to present the marketing efforts of the Project (drawing from the community assessment, marketing plan, and promotional plan) and their impact in achieving program goals (defined as participation, measures penetration, and pre- and posttest survey results). 20 refs, 8 figs., 10 tabs.

  2. Energy conservation in citrus processing. Final project report

    SciTech Connect

    Leo, M.A.; Lari, R.I.; Moore, N.R.; Broussard, M.R.; Gyamfi, M.

    1981-11-01

    Alternative energy conserving systems for use in citrus processing plants were synthesized and evaluated in terms of energy savings and economic return. The energy intensive operations that are carried out in citrus processing plants include conveying and extraction, concentration, peel drying, refrigeration, and pasteurization. The alternative energy conserving systems are synthesized from components and subsystems that are arranged to make use of energy cascading and thermodynamic regeneration to reduce the overall energy usage. System requirements such as air pollution rules and plant processing load cycles, a characterization of major operations, description of alternative system concepts, and the evaluation of alternative systems in terms of economic parameters and energy usage are identified.

  3. Municipal-building conservation project: financing conservation in municipal buildings. Final report

    SciTech Connect

    Gatton, David; Mounts, Richard; Scrimger, Kay; Wood, Elizabeth; Musselwhite, Ron; Wanning, Helen; Frazier, Andrew; Pyles, Odessa

    1982-01-01

    The purpose of this survey was to assess one dimension of the energy problem that confronts cities - energy costs for public buildings - and to see how a sample of local governments had confronted that problem. While cities of all sizes tend to have a considerable variety of buildings, most are related to the basic municipal service of administration, police and fire protection, public works, and recreation. Most of these buildings consume natural gas and electricity as their primary source of energy, sources whose price is likely to rise more rapidly than the rate of inflation in the next few years. While it is difficult to assess the reports of energy costs without comparing them to the total city budget, these costs were found to be sizable among small and medium cities, and quite large among larger cities. While several of the conservation programs in the sample dated back to 1976, almost half (14) were relatively new, having been undertaken only in the last three years. Administratively, most have been placed under the direction of budget or public works officials, and, substantively, have emphasized no-cost/low-cost measures, such as employee awareness programs and improvements in building maintenance. In keeping with this, most of the programs have been supported by reprogramming funds, supplemented with local capital improvement funds, and state and federal grants. Case studies for five localities are appended.

  4. ASEAN-USAID Buildings Energy Conservation Project. Final report, Volume 3: Audits

    SciTech Connect

    Loewen, J.M.; Levine, M.D.; Busch, J.F.

    1992-06-01

    The auditing subproject of the ASEAN-USAID Buildings Energy Conservation Project has generated a great deal of auditing activity throughout the ASEAN region. Basic building characterisfic and energy consumption data were gathered for over 200 buildings and are presented in this volume. A large number of buildings were given more detailed audits and were modeled with either the ASEAM-2 computer program or the more complex DOE-2 program. These models were used to calculate the savings to be generated by conservabon measures. Specially audits were also conducted, including lighting and thermal comfort surveys. Many researchers in the ASEAN region were trained to perform energy audits in a series of training courses and seminars. The electricity intensifies of various types of ASEAN buildings have been calculated. A comparison to the electricity intensity of the US building stock tentatively concludes that ASEAN office buildings are comparable, first class hotels and retail stores are more ewctricity intensive than their US counterparts, and hospitals are less intensive. Philippine and Singapore lighting surveys indicate that illuminance levels in offices tend to be below the minimum accepted standard. Computer simulations of the energy use in various building types generally agree that for most ASEAN buildings, electricity consumption for air-conditioning (including fan power) consumes approximately 60% of total building electricity. A review of the many studies made during the Project to calculate the savings from energy conservation opportunities (ECOS) shows a median potential savings of approximately 10%, with some buildings saving as much as 50%. Singapore buildings, apparently as a result of previously implemented efficient energy-use practices, shows a lower potential for savings than the other ASEAN nations. Air-conditioning ECOs hold the greatest potential for savings.

  5. Conservation Science Fair Projects.

    ERIC Educational Resources Information Center

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  6. ASEAN--USAID Buildings Energy Conservation Project final report. Volume 2, Technology

    SciTech Connect

    Levine, M.D.; Busch, J.F.

    1992-06-01

    This volume reports on research in the area of energy conservation technology applied to commercial buildings in the Association of Southeast Asian Nations (ASEAN) region. Unlike Volume I of this series, this volume is a compilation of original technical papers prepared by different authors in the project. In this regard, this volume is much like a technical journal. The papers that follow report on research conducted by both US and ASEAN researchers. The authors representing Indonesia, Malaysia, Philippines, and Thailand, come from a range of positions in the energy arena, including government energy agencies, electric utilities, and universities. As such, they account for a wide range of perspectives on energy problems and the role that technology can play in solving them. This volume is about using energy more intelligently. In some cases, the effort is towards the use of more advanced technologies, such as low-emittance coatings on window glass, thermal energy storage, or cogeneration. In others, the emphasis is towards reclaiming traditional techniques for rendering energy services, but in new contexts such as lighting office buildings with natural light, or cooling buildings of all types with natural ventilation. Used in its broadest sense, the term ``technology`` encompasses all of the topics addressed in this volume. Along with the more customary associations of technology, such as advanced materials and equipment and the analysis of their performance, this volume treats design concepts and techniques, analysis of ``secondary`` impacts from applying technologies (i.e., unintended impacts, or impacts on parties not directly involved in the purchase and use of the technology), and the collection of primary data used for conducting technical analyses.

  7. ASEAN-USAID buildings energy conservation project. Volume 1, Energy standards: Final report

    SciTech Connect

    Levine, M.D.; Busch, J.F.; Deringer, J.J.

    1992-06-01

    Mandatory or voluntary energy-efficiency standards for new or existing buildings can play an important role in a national program aimed at promoting energy conservation. Building codes and standards can provide a degree of control over design and building practices throughout the construction process, and encourage awareness of energy-conscious design. Studies in developed countries indicate that efficiency standards can produce energy reductions on the order of 20 to 40% or more. Within ASEAN, analyses of the savings potential from the proposed standards suggest that if implemented, these standards would produce savings over current new design practice of 19% to 24%. In this volume we provide an overview of the ASEAN-USAID project aimed at promulgating standards for energy efficiency in commercial buildings. The process of developing and implementing energy-efficiency standards for buildings can be subdivided into two key components: policy development; and technical and economic analysis. Each of these involves a number of steps and processes, as outlined in Figure 1-1. This volume describes the technical and economic analyses used to develop the proposed energy efficiency standards for four countries (Malaysia, Thailand, the Philippines, and Indonesia), and to refine an energy standard existing in Singapore since 1979. Though oriented toward the ASEAN region, the analysis methods described here are applicable in a range of settings, provided appropriate modifications are made for local building construction, climatic, economic, and political conditions. Implementation issues are not specifically addressed here; rather this volume is oriented towards the analytical work needed to establish or revise an energy standard for buildings.

  8. Data compilation for Conservation Effects Assessment Project: Yalobusha River Watershed, final report

    Technology Transfer Automated Retrieval System (TEKTRAN)

    There is increasing private and public interest in whether the investment in conservation practice installation has been a worthy use of public funding. As part of the 2002 Farm Bill, the USDA spends around $4 billion annually on the following conservation programs: Environmental Quality Incentive ...

  9. Final Report and Evaluation of Project S.P.R.U.C.E. (Science Project Related to Upgrading Conservation Education).

    ERIC Educational Resources Information Center

    Busch, Phyllis S.

    Presented is an environmental approach to elementary school science teaching. The inquiry approach is stressed and outdoor activities are integrated with classroom activities. A variety of curricular materials were developed to be used in conjunction with the New York State Elementary Science Curriculum. The project also provided workshops for…

  10. Energy-conservation-investment decision making in developing countries: A review of project implementation in industry. Final report

    SciTech Connect

    Not Available

    1989-12-01

    Despite recent efforts in a number of developing countries to promote energy conservation (EC) and efficiency, only a fraction of EC potential has been captured, especially for projects that require significant investments. The document analyzes EC efforts in 11 countries where energy audit and/or feasibility study programs have been carried out (Bangladesh, Costa Rica, Ecuador, El Salvador, Guatemala, Honduras, Jordan, Pakistan, Panama, the Philippines, and Sri Lanka), covering some 1,500 EC projects involving 242 industrial companies. Cost and length of payback seem to be the determining factors for companies considering EC measures; no-cost or low-cost projects with paybacks of less than a year (such as power factor improvement projects) had the highest rate of implementation, while expensive, complicated projects (e.g., cogeneration or fuel substitution projects) were most often rejected. The document concludes, however, that the rate of implementation of EC programs has been quite high, and recommends that inexpensive, short-term projects be featured in future EC programs and increased levels of TA and financial assistance be made available to companies implementing long-term EC measures.

  11. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    SciTech Connect

    Not Available

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  12. Conservation Education Improvement. Final Report.

    ERIC Educational Resources Information Center

    Diem, Kenneth L.; Hennebry, Howard M.

    In an attempt to improve the teaching of conservation in elementary and junior high schools, a set of integrated sequential core units was formulated and tested in five Wyoming school districts during the fall and early winter of 1968. Based on a total sample of 840 elementary students (38% usable response) and 960 junior high students (49% usable…

  13. Project Adobe. Final Report.

    ERIC Educational Resources Information Center

    Van Curen, Sallie A.

    This final report describes activities and accomplishments of Project Adobe, the New Mexico Parent Training and Information Center, which provides information, support, education and training to families with school-aged children with disabilities in their local communities. Achievements include: (1) completion and printing of a booklet on the…

  14. The Finals Examination in Conservative Dentistry.

    ERIC Educational Resources Information Center

    Jeffrey, I. M. W.; Grieve, A. R.

    1987-01-01

    The format of the final examinations in Conservative Dentistry in the Dental Schools of Great Britain and Ireland was investigated by means of a questionnaire sent to each of the dental schools in each country. Results are reported and the value of different parts of the examinations are discussed. (Author/RH)

  15. Communicating Conservation Effects Assessment Project Results

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Conservation Effects Assessment Project (CEAP) is a unique effort to quantify the environmental benefits of conservation practices at watershed scales and nationally. Such a large-scale project cannot be accomplished without the cooperation and communication of a wide range of experts and stakeh...

  16. Subjective risk assessment for planning conservation projects

    NASA Astrophysics Data System (ADS)

    Game, Edward T.; Fitzsimons, James A.; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-12-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner.

  17. Project BEST Final Report.

    ERIC Educational Resources Information Center

    Pankratz, David; Friedenberg, Joan

    Project BEST (Building Energy Systems Technology), a bilingual vocational training program, operated at Oakton Community College between March 1986 and September 1987. The purpose of the project was to provide 60 limited English proficient (LEP) Hispanic and Polish adults with sufficient vocational skills, English language skills, and appropriate…

  18. Project ACHIEVE final report

    SciTech Connect

    1997-06-13

    Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

  19. Final Year Project Report

    SciTech Connect

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  20. Project ACORDE. Final Report.

    ERIC Educational Resources Information Center

    Kelley, Marjorie L.

    A report is presented on the evaluation and redevelopment of an 11-module course of instruction in restorative dentistry conducted under Project Acorde. The major learning goals for students were: acquisition of the necessary skills and knowledge of appropriate tools and materials; and self-appraisal of one's own work in performing the various…

  1. ACCESS Project: Final Report

    SciTech Connect

    Weller, Heiko

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  2. Final Project Report

    SciTech Connect

    Small, R. Justin; Bryan, Frank; Tribbia, Joseph; Park, Sungsu; Dennis, John; Saravanan, R.; Schneider, Niklas; Kwon, Young-Oh

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  3. Geothermal Project. Final report

    SciTech Connect

    Not Available

    1983-03-31

    The project was designed to take 95/sup 0/F water from an existing well and process it through a heat exchanger carrying supply water for our boiler make up and domestic hot water systems. The temperature of this water runs from 55/sup 0/F to 65/sup 0/F. In operation it was possible to raise the temperature of this water an average of approximately 12/sup 0/F. The amount of energy captured was recorded and it was found that one can capture approximately 199 x 10/sup 6/ Btu/Mo. Using current energy costs and a boiler efficiency factor of .8 a potential annual savings of approximately $11,104/year was calculated. The total cost of the project was $31,893.68. Using these figures a simple pay back period of 2.9 years was calculated.

  4. Final Project Report

    SciTech Connect

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  5. Final project report

    SciTech Connect

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  6. Final project report

    SciTech Connect

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  7. The Trine Project Final Report.

    ERIC Educational Resources Information Center

    Gunderson, Jon R.; And Others

    The final report describes the Trine Project which addressed three needs in the education of handicapped children: the need for an alternate writing system, the need for communication, and the need for access to general purpose computers used in the schools. The project had three major objectives: (1) to design a low-cost portable writing and…

  8. Final Project Report

    SciTech Connect

    Zhang, Jin; Zhao, Yiping

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  9. Final Project Report

    SciTech Connect

    Carrick M. Eggleston

    2003-12-12

    This report provides a description of the main accomplishments of the EMSP funded research, including products such as conference presentations and publications (including those still in preparation). The purpose of this study was to better understand the chemical interactions between dissolved aqueous contaminants and carbonate minerals occurring as coatings on mineral grains in the vadose zone beneath the Hanford reserve. This information is important for construction of improved reactive transport models intended to predict the subsurface migration of contaminants. We made improvements to the hydrothermal atomic force microscope (HAFM) design to be used in this project. The original HAFM was built with funding from the U.S. DOE, Office of Basic Energy Sciences. Improvements include operating limits of 70 bars and 170 C, from an original limit of 12 bars and 150 C. This product is patented. We completed a series of studies of magnesite, MgCO3, because this mineral is structurally equivalent to calcite but reacts much more slowly, allowing us to study carbonate reactivity under pH conditions (i.e., low pH) that are much more problematic for studies of calcite but which are nevertheless relevant to in-situ conditions. We found that dissolving magnesite exhibits a dramatic change in step orientation, and therefore etch pit shape, as pH is lowered through 4.2 to 3 and 2. This change in step orientation is NOT accompanied by an increase in step velocity with decreasing pH. We also found that, after growing magnesite on a magnesite substrate, the newly grown magnesite dissolved much more readily than the underlying substrate magnesite, and exhibited far larger etch pit densities. This effect may have been related to the rate of growth or to the presence of an Fe impurity in the growth solutions. We studied the dissolution of magnesite and calcite (104) surfaces under a wider variety of conditions with a new hydrodynamically defined hydro thermal AFM fluid cell, and we

  10. Community Participation in Jamaican Conservation Projects.

    ERIC Educational Resources Information Center

    Lundy, Patricia

    1999-01-01

    In Jamaica, people most likely to be affected by environmental degradation are less likely to be involved in environmental nongovernmental organizations and community-based conservation projects. Funders, practitioners, and policy makers should work to remove barriers to participation and ensure equitable allocation of funding. (SK)

  11. Multihandicapped Blind. Final Project Report.

    ERIC Educational Resources Information Center

    Jones, Lloyd

    The final report of the Garden Grove unified school district project for 1969 through 1972 (funded through Title III) involving six multiply handicapped, legally blind children, 7- to 10-years-old, who were previously excluded from special education (SE) classes is presented. Described as the main procedural objective is development of a…

  12. Physicians Training Project. Final Report.

    ERIC Educational Resources Information Center

    Bruder, Mary Beth

    This final report describes the accomplishments and activities of a project which developed, implemented, and evaluated training activities for medical students, pediatric residents, and practicing physicians to enhance their understanding of and involvement with early intervention and the special education system in Connecticut. The training…

  13. Energy Conservation Research Study. Final Report.

    ERIC Educational Resources Information Center

    Cayemberg, Merlin; And Others

    This study explored the availability of energy conservation programs at community colleges; the apparent need for such programs or courses by industry, business, and government; and the types of programs, if any, which should be offered at the vocational/technical level. Information was sought from 52 current two-year programs, the fifty state…

  14. City of Corvallis Rental Housing Energy Conservation: Final report

    SciTech Connect

    Christensen, J.J.

    1986-06-01

    This report provides a summary of the results of the Corvallis Rental Housing Energy Conservation Project. In addition to the report summary of the BPA project marketing and educational activities, Appendices A, B and C contain background material regarding the Corvallis weatherization financing program. For individuals reviewing the project results, these appendices are recommended reading for understanding Corvallis innovative approach to promoting rental housing energy conservation.

  15. Design Alternatives for Evaluating the Impact of Conservation Projects

    ERIC Educational Resources Information Center

    Margoluis, Richard; Stem, Caroline; Salafsky, Nick; Brown, Marcia

    2009-01-01

    Historically, examples of project evaluation in conservation were rare. In recent years, however, conservation professionals have begun to recognize the importance of evaluation both for accountability and for improving project interventions. Even with this growing interest in evaluation, the conservation community has paid little attention to…

  16. Financial Energy Conservation Projects at Independent Colleges and Universities.

    ERIC Educational Resources Information Center

    Morrell, L. R.

    1981-01-01

    Factors affecting financial decisions for energy conservation projects at independent colleges and universities and methods that may be used when making a financial investment decision are examined, along with sources of funding for the projects. Projects that result in the conservation of energy resources might, in a time of extreme shortages,…

  17. Curriculum for Energy Use and Conservation Technicians. Final Report.

    ERIC Educational Resources Information Center

    Hull Daniel M.

    A project designed a national curriculum model for Energy Conservation-and-Use Technicians (ECUTs) and developed and tested instructional materials for use in the courses. The two-year postsecondary ECUT curriculum was designed to provide an interdisciplinary technical base (electrical, mechanical, thermal, and fluidal principles) and technical…

  18. Project WORKSMART. A Final Report.

    ERIC Educational Resources Information Center

    NashvilleREAD, Nashville, TN.

    Project WORKSMART was a Nashville, Tennessee-based workplace literacy project to provide an exemplary multidimensional workplace literacy program while simultaneously demonstrating products and practices that promote lifelong learning that can be customized and replicated in diverse work environments. The project was a partnership between…

  19. Readings in Wildlife and Fish Conservation, High School Conservation Curriculum Project.

    ERIC Educational Resources Information Center

    Ensminger, Jack

    This publication is a tentative edition of readings on Wildlife and Fish Conservation in Louisiana, and as such it forms part of one of the four units of study designed for an experimental high school course, the "High School Conservation Curriculum Project." The other three units are concerned with Forest Conervation, Soil and Water Conservation,…

  20. 78 FR 43912 - Final Candidate Conservation Agreement with Assurances, Final Environmental Assessment, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ...We, the U.S. Fish and Wildlife Service (Service), make available the final Candidate Conservation Agreement with Assurances (CCAA) for the Rio Grande cutthroat trout (Oncorhynchus clarki virginialis) in New Mexico and Colorado, as well as the final environmental assessment (EA) and the draft Finding of No Significant Impact (FONSI) under the National Environmental Policy Act of 1969 (NEPA).......

  1. Project TIME. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Schroyer, Connie J.; Payne, David L.

    Project TIME (Training Initiative for Manufacturing Employees) was an 18-month National Workplace Literacy Program conducted by Lord Fairfax Community College in conjunction with an automotive parts plant and Triplett Technical and Business Institute in Virginia. Project TIME had three primary objectives: to help employees obtain the basic…

  2. Educational Information Project. Final Report.

    ERIC Educational Resources Information Center

    Foley, Walter J.

    The CardPac System of Educational Accounting project developed instruments and procedures for collecting information about aspects of the elementary and secondary educational programs in Iowa. This project included the development of a bank of educational information that will transcribe, integrate, and store information centrally for purposes of…

  3. Comprehensive Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    1969

    This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…

  4. Landfill gas project. Final report

    SciTech Connect

    1983-01-01

    The methane gas recovered from the landfill is used for space heating and water heating for the Florence-Lauderdale Humane Shelter 600 feet from the well head. The project to date and future development are described briefly. (MHR)

  5. Insulated siding project: Final report

    SciTech Connect

    Not Available

    1986-12-01

    Research and development on the nibbed vinyl insulative siding product has been completed. The product has been tested and evaluated in response to the issues raised by the first and second stage reviewers in the OERI invention review process. The production run machine design has been completed, prototyped and evaluated and the agreement for full-scale production. Final evaluation and testing of the machine's flawless part production was integral to the manufacture and preparation of samples for purposes of final tests in the Ball State CERES laboratories.

  6. Green Schools Project Final Report

    SciTech Connect

    Verdict, M.

    2000-09-27

    The Alliance to Save Energy has responded to interest in the Green Schools concept from the New England states of Maine, New Hampshire and Vermont. The Alliance conducted a train-the-trainers workshop in Augusta, Maine March 17--18, 1999. This work is part of a Green Schools replication project leveraged by funds from another source, NORDAX, which contributed $80,000 to provide partial support to staff at the Maine Energy Education Project (MEEP), Vermont Energy Education Program (VEEP), and New Hampshire Governor's Office to develop Green Schools Projects. DOE funds were used to conduct training, develop a network of state and local government, business and school partners to support school efficiency activities in those three states.

  7. Project HEED. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    During 1972-73, Project HEED (Heed Ethnic Educational Depolarization) involved 1,350 Indian students in 60 classrooms at Sells, Topowa, San Carlos, Rice, Many Farms, Hotevilla, Peach Springs, and Sacaton. Primary objectives were: (1) improvement in reading skills, (2) development of cultural awareness, and (3) providing for the Special Education…

  8. Anthropometric Training Project. Final Report.

    ERIC Educational Resources Information Center

    San Diego State Coll., CA.

    The Anthropometric Training Project was aimed at providing a training program for select students to develop research competency in an area relating body type, composition, anthropometric assessment, and physical performance measures. The program involves interdisciplinary cooperation in training through seminars, laboratory practice, and…

  9. The Compact Project: Final Report.

    ERIC Educational Resources Information Center

    National Alliance of Business, Inc., Washington, DC.

    The National Alliance of Business (NAB) surveyed the 12 sites that participated in the Compact Project to develop and implement programs of business-education collaboration. NAB studied start-up activities, key players, conditions for collaboration, accomplishments, challenges, and future plans. Program outcomes indicated that building successful…

  10. Montana Faxnet Project. Final Report.

    ERIC Educational Resources Information Center

    Brander, Linda L.

    This report summarizes the activities and accomplishments of the Montana Faxnet Project, which was created to design and demonstrate a statewide document delivery network utilizing telefacsimile equipment that would create equitable access for all Montanans accessing and retrieving information, and reduce the waiting time for requested materials…

  11. Project Open Door. Final Report.

    ERIC Educational Resources Information Center

    Verheyden-Hilliard, Mary Ellen

    The major purpose of Project Open Door was to design, develop, test, and disseminate a portable module for vocational educators and others to use with junior high school students in pre-vocational exploration free of sex stereotyping. The module produced contained a slide presentation with accompanying cassette tape and a leader's guide. An…

  12. Collection Analysis Project. Final Report.

    ERIC Educational Resources Information Center

    Dole, Wanda; And Others

    The Collection Analysis Project (CAP) was undertaken in response to one of the major recommendations of the University at Stony Brook Libraries' strategic plan. It is the first step in promoting the necessary change to bring collection management and development into conformity with accepted professional practice, and make it more responsive to…

  13. Computer Conferencing Project. Final Report.

    ERIC Educational Resources Information Center

    McNeil, Donald R.; And Others

    This report of a 3-year project discusses the results of the testing of computer conferencing and e-mail (electronic mail) at Montgomery College (Maryland) over a period of four semesters. The product was designed to answer the following questions: (1) Could computer conferencing or e-mail increase access? (2) Would the quality of the instruction…

  14. Pataha Creek Model Watershed : 1998 Habitat Conservation Projects.

    SciTech Connect

    Bartels, Duane G.

    1999-12-01

    The projects outlined in detail on the attached project reports are a few of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. 1998 was a year where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek.

  15. Spray casting project final report

    SciTech Connect

    Churnetski, S.R.; Thompson, J.E.

    1996-08-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step.

  16. Model Tech Prep Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Southern Maryland Educational Consortium, La Plata.

    The Southern Maryland Educational Consortium's Tech Prep Model Demonstration project is described in this final report. The consortium members are Calvert, Charles, and St. Mary's county school districts and Charles County Community College in southern Maryland. The project is based on a 4 + 2 model in which ninth-grade students develop career…

  17. California Prison Gang Project. Final Report.

    ERIC Educational Resources Information Center

    Cummins, Eric

    A project investigated the cultural life, ideology, and education systems of particular prison gangs. It focused on recent changes in the gang system regarding gang education, organizational structure, and the balance of power in prisons and in relations with street gangs. Finally, the project assessed California's response to its prison gangs, in…

  18. ECP (Environmental Conservation Project) Report, No. 5, March 1976. Planning for Energy Conservation.

    ERIC Educational Resources Information Center

    Environmental Law Inst., Washington, DC.

    The culmination of the Environmental Law Institute's Energy Conservation Project will be a series of handbooks addressed to state and local officials, legislators, and interested citizens setting out suggested strategies for conserving energy. This issue of the ECP Report publishes the first of a series of draft chapters from these handbooks - a…

  19. Conservation Project Shows Substantial Reduction in Home Water Use

    ERIC Educational Resources Information Center

    Sharpe, William E.; Smith, Donald

    1978-01-01

    Describes a water use study-conservation project conducted by the Washington Suburban Sanitary Commission in Maryland. Results show a significant decrease in the amount of water used by home customers over a ten-year period. (Author/MA)

  20. Lagoon Restoration Project: Final report

    SciTech Connect

    1995-03-01

    This project is a multiyear effort focusing on energy flow in the Palace of Fine Arts lagoon just outside the Exploratorium in San Francisco. Phase 1 was a pilot study to determine the feasibility of improving biological energy flow through the small freshwater lagoon, using the expertise and resources of an environmental artist in collaboration with museum biologists and arts department staff. The primary outcome of Phase 1 is an experimental fountain exhibit inside the museum designed by public artist Laurie Lundquist with Exploratorium staff. This fountain, with signage, functions both as a model for natural aeration and filtration systems and as a focal point for museum visitors to learn about how biological processes cycle energy through aquatic systems. As part of the study of the lagoon`s health, volunteers continued biweekly bird consus from March through September, 1994. The goal was to find out whether the poor water quality of the lagoon is affecting the birds. Limited dredging was undertaken by the city Parks and Recreation Department. However, a more peermanent solution to the lagoon`s ecological problems would require an ambitious redesign of the lagoon.

  1. Conservation Planning with Uncertain Climate Change Projections

    PubMed Central

    Moilanen, Atte; Araújo, Miguel B.

    2013-01-01

    Climate change is affecting biodiversity worldwide, but conservation responses are constrained by considerable uncertainty regarding the magnitude, rate and ecological consequences of expected climate change. Here we propose a framework to account for several sources of uncertainty in conservation prioritization. Within this framework we account for uncertainties arising from (i) species distributions that shift following climate change, (ii) basic connectivity requirements of species, (iii) alternative climate change scenarios and their impacts, (iv) in the modelling of species distributions, and (v) different levels of confidence about present and future. When future impacts of climate change are uncertain, robustness of decision-making can be improved by quantifying the risks and trade-offs associated with climate scenarios. Sensible prioritization that accounts simultaneously for the present and potential future distributions of species is achievable without overly jeopardising present-day conservation values. Doing so requires systematic treatment of uncertainties and testing of the sensitivity of results to assumptions about climate. We illustrate the proposed framework by identifying priority areas for amphibians and reptiles in Europe. PMID:23405068

  2. Typology of public outreach for biodiversity conservation projects in Spain.

    PubMed

    Jiménez, Amanda; Iniesta-Arandia, Irene; Muñoz-Santos, Maria; Martín-López, Berta; Jacobson, Susan K; Benayas, Javier

    2014-06-01

    Conservation education and outreach programs are a key approach to promote public understanding of the importance of biodiversity conservation. We reviewed 85 biodiversity conservation projects supported by the Spanish Ministry of Environment's Biodiversity Foundation. Through content analysis and descriptive statistics, we examined how the projects carried out communication, education, and public awareness and participation (CEPA) actions. We also used multivariate statistical analysis to develop a typology of 4 classes of biodiversity conservation projects on the basis of CEPA implementation. The classifications were delineated by purpose of CEPA, level of integration of CEPA actions, type of CEPA goals, main CEPA stakeholders, and aim of conservation. Our results confirm the existence of 2 key positions: CEPA has intrinsic value (i.e., they supposed the implementation of any CEPA action indirectly supported conservation) and CEPA is an instrument for achieving conservation goals. We also found that most CEPA actions addressed general audiences and school children, ignored minority groups and women, and did not include evaluation. The characteristics of the 4 types of projects and their frequency of implementation in the sample reflect the need for better integration of different types of actions (communication, education, and participation) and improved fostering of participation of multiple stakeholders in developing policy and implementing management strategies. PMID:24400698

  3. Multi-faceted energy-conservation program. Final technical report

    SciTech Connect

    Not Available

    1981-01-01

    The purpose of this project was to design and build 19 solar thermosiphoning air panels, insulate walls, generally tighten up the library building, and install other energy conserving devices. Another purpose of the project was to serve as a model to other libraries in Kentucky, to commercial buildings in this area, and to homeowners in the area. After much discussion with architects and among ourselves, we chose a type of solar installation that would be visible to the public and easily replicated. We also carried out a number of procedures to make the library building more energy efficient: installed a 7-day programmable setback thermostat; insulated the walls; improved weatherstripping around the doors; added an economizer control to our air-handling system; and put an electric damper controlling supply air to a large but intermittently usedmeeting room. These changes resulted in approximately $700 in savings from December 1981, through February 1982. Thus far, we have carried out public education with a sign, brochures, press releases, and the purchase of appropriate books; librarians have received our brochure, and some have attended a workshop given here on energy conservation and solar energy.

  4. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  5. Pregnant Adolescent Substance Abuse Project. Final Report.

    ERIC Educational Resources Information Center

    McKnight, A. James

    This document is the final report on the Pregnant Adolescent Substance Abuse Project (PASAP) conducted in Prince Georges County (Maryland) in 1987 and 1988. The PASAP consisted of two components that operated independently: an Early Intervention Program that increased the proportion of pregnant adolescent substance users who were using various…

  6. Project "Flashlight" Planning Grant. Final Report.

    ERIC Educational Resources Information Center

    Ehrmann, Stephen C.

    This final report describes results of a planning grant for the "Flashlight" project, an effort to develop, test, and disseminate evaluation procedures that a postsecondary institution or department could use to periodically assess its evolving educational strategies, in particular strategies supported by use of computing, video, and…

  7. A Study of Number Conservation With Tasks Which Vary in Length, Area and Volume. Final Report.

    ERIC Educational Resources Information Center

    Taranto, Maria; Mermelstein, Egon

    The objective of this study was an attempt to clarify the nature of number conservation with number conservation tasks using variations in length, area, and volume. According to Piagetian theory, conservation is attained successively for number, length, area, and, finally, volume. It was hypothesized that success on the number conservation tasks…

  8. 76 FR 793 - Multistate Conservation Grant Program; Priority List for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... the FY 2011 priority list of wildlife and sport fish conservation projects from the Association of Fish and Wildlife Agencies (AFWA). As required by the Wildlife and Sport Fish Restoration Programs....gov (e-mail). SUPPLEMENTARY INFORMATION: The Wildlife and Sport Fish Restoration Programs...

  9. 78 FR 25093 - Multistate Conservation Grant Program; Priority List and Approval for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... Conservation Grant Program FY 2013 Projects Total 2013 ID Title Submitter PR funding \\1\\ DJ funding \\2\\ grant........... Understanding Greater Sage- WAFWA 315,042 0 315,042 grouse Response to Wind Energy Development at a Landscape... Restoration funds. \\2\\ DJ Funding: Dingell-Johnson Sport Fish Restoration funds. ASA: American Sport...

  10. Overview of the Choptank River watershed conservation effectiveness assessment project.

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Choptank River is a benchmark watershed in the Conservation Effectiveness Assessment Project. It is an estuary and tributary of the Chesapeake Bay. Land use in the watershed (2057 square km) is classified as 52% agriculture, 26% forested, and 5% developed. Agricultural production is centered ...

  11. Training Manual for the Energy Conservation Analysis Project.

    ERIC Educational Resources Information Center

    Massachusetts Univ., Amherst. Cooperative Extension Service.

    This document is the Massachusetts Energy Extension Service training manual for Residential Energy Auditors. This manual is part of a four-week program to train persons to perform home energy audits and was developed under the Energy Conservation Analysis Project (ECAP) at the University of Massachusetts. The chapter titles include: (1) Project…

  12. Fine sediment sources in conservation effects assessment project watersheds

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Two naturally occurring radionuclides, 7Be and 210Pbxs , were used as tracers to discriminate eroded surface soils from channel-derived sediments in the fine suspended sediment loads of eight Conservation Effects Assessment Project (CEAP) benchmark watersheds. Precipitation, source soils, and suspe...

  13. Prototypical Consolidation Demonstration Project: Final report

    SciTech Connect

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy`s Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG&G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG&G Idaho`s assessments of the equipment and procedures developed by NUS.

  14. 12 CFR 627.2790 - Final discharge and release of the conservator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Final discharge and release of the conservator. 627.2790 Section 627.2790 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM TITLE IV CONSERVATORS, RECEIVERS, AND VOLUNTARY LIQUIDATIONS Conservators and Conservatorships § 627.2790...

  15. User manual for the Hanford Energy Conservation Project data base

    SciTech Connect

    Humphreys, K.K.; Fassbender, L.L.; Weakley, S.A.

    1987-09-01

    The Hanford Energy Conservation (HEC) Project Data Base developed by the Pacific Northwest Laboratory for the US Department of Energy's Richland Operations Office, provides a centralized storehouse of information on planned and ongoing projects which are part of the HEC project. The data base will enable quick analysis of the project portfolio. The data base uses dBase III Plus on an IBM PC. Over 40 data items are stored for each project. A menu-driven applications program was developed as an alternative to using standard dBase III Plus commands. The menu-driven program prompts the user to add data, edit data, perform on-screen searches of the data base, sort the data base by any variable or combination of variables, or generate hard-copy reports of the stored data.

  16. 77 FR 31870 - Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Fish and Wildlife Service Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service) announce that our Final Comprehensive Conservation...

  17. Natural resource dependency and decentralized conservation within Kanchenjunga Conservation Area Project, Nepal.

    PubMed

    Parker, Pete; Thapa, Brijesh

    2012-02-01

    Kanchenjunga Conservation Area Project (KCAP) in Nepal is among the first protected areas in the world to institute a completely decentralized system of conservation and development. Proponents of decentralized conservation claim that it increases management efficiency, enhances the responsiveness to local needs, and promotes greater equity among local residents. This study assessed local equity by evaluating the levels of dependencies on natural resources among households and the factors affecting that dependency. Data were collected via detailed surveys among 205 randomly selected households within the KCAP. Natural resource dependency was evaluated by comparing the ratio of total household income to income derived from access to natural resources. Economic, social, and access-related variables were employed to determine potential significant predictors of dependency. Overall, households were heavily dependent on natural resources for their income, especially households at higher elevations and those with more adult members. The households that received remittances were most able to supplement their income and, therefore, drastically reduced their reliance on the access to natural resources. Socio-economic variables, such as land holdings, education, caste, and ethnicity, failed to predict dependency. Household participation in KCAP-sponsored training programs also failed to affect household dependency; however, fewer than 20% of the households had any form of direct contact with KCAP personnel within the past year. The success of the KCAP as a decentralized conservation program is contingent on project capacity-building via social mobilization, training programs, and participatory inclusion in decision making to help alleviate the dependency on natural resources. PMID:22127405

  18. Natural Resource Dependency and Decentralized Conservation Within Kanchenjunga Conservation Area Project, Nepal

    NASA Astrophysics Data System (ADS)

    Parker, Pete; Thapa, Brijesh

    2012-02-01

    Kanchenjunga Conservation Area Project (KCAP) in Nepal is among the first protected areas in the world to institute a completely decentralized system of conservation and development. Proponents of decentralized conservation claim that it increases management efficiency, enhances the responsiveness to local needs, and promotes greater equity among local residents. This study assessed local equity by evaluating the levels of dependencies on natural resources among households and the factors affecting that dependency. Data were collected via detailed surveys among 205 randomly selected households within the KCAP. Natural resource dependency was evaluated by comparing the ratio of total household income to income derived from access to natural resources. Economic, social, and access-related variables were employed to determine potential significant predictors of dependency. Overall, households were heavily dependent on natural resources for their income, especially households at higher elevations and those with more adult members. The households that received remittances were most able to supplement their income and, therefore, drastically reduced their reliance on the access to natural resources. Socio-economic variables, such as land holdings, education, caste, and ethnicity, failed to predict dependency. Household participation in KCAP-sponsored training programs also failed to affect household dependency; however, fewer than 20% of the households had any form of direct contact with KCAP personnel within the past year. The success of the KCAP as a decentralized conservation program is contingent on project capacity-building via social mobilization, training programs, and participatory inclusion in decision making to help alleviate the dependency on natural resources.

  19. Mapping degradation and conservation in the DESIRE Project

    NASA Astrophysics Data System (ADS)

    van Lynden, G.; Mantel, S.

    2012-04-01

    Mapping degradation and conservation in the DESIRE Project The World Overview of Conservation Approaches and Technologies initiative (WOCAT) started in 1992, in reaction to the Global Assessment of Soil Degradation (GLASOD) by ISRIC. The original idea of WOCAT was to develop a world map similar the GLASOD one, however showing the positive side, i.e. describing what achievements had been made to combat soil degradation. Since 1992 WOCAT has developed and tested a method for standardized documentation and evaluation of Sustainable Land Management (SLM). It comprises three questionnaires, for documenting "Technologies" (what is actually implemented in the field), "Approaches" (what is needed in terms of "enabling environment" for a successful implementation of a technology) and a mapping questionnaire. The resulting database currently counts more than 350 technologies and over 250 approaches from around 50 countries. In the DESIRE project the WOCAT mapping tool was used to map area coverage, degree, impact, effectiveness, and other parameters of land degradation and conservation for 16 study sites. The mapping method in the study sites complements the information provided by the individual case studies on technologies and Approaches. It evaluates what type of land degradation is actually happening where and what is done about it in terms of Sustainable Land Management (SLM). The on-line map database is hosted by WOCAT, and the mapped outputs that can be generated from this database provide a powerful tool to obtain an overview of land degradation and conservation in a country, a region, or worldwide.

  20. Salt river project's participation in Arizona's bald eagle conservation efforts

    NASA Astrophysics Data System (ADS)

    Nobel, Teah A.

    1996-11-01

    Bald eagle ( Haliaeetus leucocephalus) conservation in Arizona, USA, is a prime example of a successful, cooperative environmental management effort. The Salt River Project (SRP) is an active participant in the statewide bald eagle management activities. This paper summarizes the major components of the statewide program and highlights SRP's participation in these efforts. The Southwestern Bald Eagle Management Committee (SWBEMC) was formed as a means of coordinating interagency projects. Chaired by the Arizona Game and Fish Department (AGFD), the SWBEMC is comprised of 15 state, federal, tribal, and private agencies. Together, these agencies sponsor the Nest Watch Program, a unique and effective program dedicated to the study, conservation, and recovery of bald eagles in the southwest. Other significant components of the bald eagle management program include nest monitoring, nest search activities, winter counts, and demography studies.

  1. Effect of risk aversion on prioritizing conservation projects.

    PubMed

    Tulloch, Ayesha I T; Maloney, Richard F; Joseph, Liana N; Bennett, Joseph R; Di Fonzo, Martina M I; Probert, William J M; O'Connor, Shaun M; Densem, Jodie P; Possingham, Hugh P

    2015-04-01

    Conservation outcomes are uncertain. Agencies making decisions about what threat mitigation actions to take to save which species frequently face the dilemma of whether to invest in actions with high probability of success and guaranteed benefits or to choose projects with a greater risk of failure that might provide higher benefits if they succeed. The answer to this dilemma lies in the decision maker's aversion to risk--their unwillingness to accept uncertain outcomes. Little guidance exists on how risk preferences affect conservation investment priorities. Using a prioritization approach based on cost effectiveness, we compared 2 approaches: a conservative probability threshold approach that excludes investment in projects with a risk of management failure greater than a fixed level, and a variance-discounting heuristic used in economics that explicitly accounts for risk tolerance and the probabilities of management success and failure. We applied both approaches to prioritizing projects for 700 of New Zealand's threatened species across 8303 management actions. Both decision makers' risk tolerance and our choice of approach to dealing with risk preferences drove the prioritization solution (i.e., the species selected for management). Use of a probability threshold minimized uncertainty, but more expensive projects were selected than with variance discounting, which maximized expected benefits by selecting the management of species with higher extinction risk and higher conservation value. Explicitly incorporating risk preferences within the decision making process reduced the number of species expected to be safe from extinction because lower risk tolerance resulted in more species being excluded from management, but the approach allowed decision makers to choose a level of acceptable risk that fit with their ability to accommodate failure. We argue for transparency in risk tolerance and recommend that decision makers accept risk in an adaptive management

  2. Northeast Oregon Hatchery Project, Final Siting Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  3. Final Report for the NERI Project

    SciTech Connect

    John C. Lee

    2009-03-31

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report.

  4. Governor's Energy Project, final project report, March 1984

    SciTech Connect

    Not Available

    1984-03-01

    The report documents the early period of the Governors Energy Project, operated under the auspices of the National Governors Association (NGA) from January 1, 1974 through June 30, 1977, and outlines the context within which NHA's energy program began. Further, the general goals, objectives, and tasks of the project are delineated, and the process and product-oriented mechanisms or techniques used by the Project to fulfill its goals, objectives, and tasks are addressed. Finally, the major outcomes and lessons learned with regard to the development, implementation, and maintenance of the intermediary role in the intergovernmental system in addressing nationwide problems, including those with scientific content, are considered. Results reveal that two types of energy information and expertise-sharing took place: State to State, and State to others. Further, the capability of States to develop energy-related policies based in science and technology was enhanced, and State energy offices were strengthened. Federal support is said to be crucial in initiating projects requiring catalytic and coordinative functions.

  5. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  6. Pataha Creek Model Watershed : 1999 Habitat Conservation Projects.

    SciTech Connect

    Bartels, Duane G.

    2000-10-01

    The projects outlined in detail on the attached project reports are a summary of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. Up until last year, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and was the main focus of the implementation phase of the watershed plan. These practices are the main focus of the watershed plan to reduce the majority of the sediment entering the stream. However, the watershed stream evaluation team used in the watershed analysis determined that there were problems along the Pataha Creek that needed to be addressed that would add further protection to the banks and therefore a further reduction of sedimentation into the stream. 1999 was a year where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek. Over 95% of the sediment entering the stream can be tied directly to the upland and riparian areas of the watershed. In stream work was not addressed this year because of the costs associated with these projects and the low impact of the sediment issue concerning Pataha Creeks impact on Chinook Salmon in the Tucannon River.

  7. Energy conserving site design case study: Shenandoah, Georgia. Final report

    SciTech Connect

    Not Available

    1980-01-01

    The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as a passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)

  8. The LiveWire Project final report

    SciTech Connect

    Brown, C.D.; Nelson, T.T.; Kelly, J.C.; Dominguez, H.A.

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  9. NCSU solar energy and conservation house. Final report

    SciTech Connect

    Not Available

    1981-10-01

    A passive solar energy house has been built adjacent to the NCSU McKimmon Continuing Education Center. The house contains a two-story embedded sunspace, two Trombe walls, active solar hot water heating, thermal storage in a rock filled ceiling/floor, and numerous research treatments, and energy conservation features. (See attached photo brochure; Appendix 1). The house is completely decorated and furnished in an attractive manner and the exterior architecture is traditional and has broad consumer appeal. It is also thoroughly instrumented to monitor performance. The house is open to the public on weekends and numerous people come to visit on their own initiative and others take advantage of the close proximity to McKimmon while there attending conferences. The house will influence and motivate large numbers of people to consider solar and energy conservation facets in their homes and will provide data to substantiate performance to prospective home buyers and meaningful data on design and construction for builders.

  10. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ..., 2011, the BLM published a Notice of Intent (NOI) to prepare an EIS in the Federal Register (76 FR 57073... Bureau of Land Management Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement, Riverside County, CA and the Proposed California Desert Conservation Area...

  11. N-STAR/IMAGE Project. Final report

    SciTech Connect

    Driver, R.K.

    1993-06-30

    This is the final report on the N*IMAGE project. It contains a brief abstract of the project background, objectives, efforts taken to achieve the objectives, and publications provided. The Soviet Union has devolved into various autonomous republics, each having individual nationalistic agendas, yet retaining many of the indigenous capabilities and facilities that were present prior to the dissolution of the USSR. Military forces, especially nuclear, still exist in spite of the changes in the overarching control hierarchy. The Commonwealth of Independent States [CIS] has been created, ostensibly maintaining control over the strategic forces of the now-defunct Soviet Union. These changes have created an identifiable need to understand the old forces in a new context. It is important to understand the political, social, and economic structures that bear on the new environment. Information on the individual republics and former Soviet Union is coming in at a staggering rate; it must be assimilated and analyzed while being careful not to lose those existing data points and analysis of Soviet information that are still relevant. The objective of the proposed FSRC work was to provide user-friendly, automated analytical tools to assist the analyst in assessing various aspects of Russia and CIS Nuclear Weapons. For each, the data package includes an extensive, free-form, interactive database system (N-STAR), a hierarchical structure of questions which lead an analyst through the essential elements of the related decisionmaking process (IMAGE), and an instruction manual explaining the use of the systems and their interrelationships. Relevant data su porting the analysis will be available in a standard format on the same system, facilitating data fusion and assessment. These analyst tools are in the form of Macintosh-compatible software systems (N-STAR and IMAGE) along with supporting documentation.

  12. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  13. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  14. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  15. What Can Students Learn from Final Year Research Projects?

    ERIC Educational Resources Information Center

    Ryder, Jim

    2004-01-01

    Final year research projects are a feature of most biosciences undergraduate courses. However, in a climate of increasing student numbers there is growing interest in providing alternatives to such resource-intensive projects. This interest raises some key questions. In particular, what do students learn from traditional final year projects and…

  16. I-SAVE conservation program. Implementing title II of NECPA residential conservation service. Final draft

    SciTech Connect

    1980-05-30

    The I-SAVE (Iowa Saves America's Vital Energy) conservation plan provides comprehensive energy-conservation information and services to residential consumers served by large investor-owned electric and gas utilities and participating home-heating suppliers. The overall objective of the I-SAVE plan is to conserve energy by facilitating cost-effective retrofit of existing housing and promoting more-efficient energy use. The ultimate benefit available to the customer under the I-SAVE plan - reduction in energy use - is dependent upon the action he or she takes as a result of the program audit. Benefits to the utility and the ratepayers as a whole, however, will accrue only upon widespread customer acceptance and utilization of program services. This degree of program acceptance and the resulting benefits to ratepayers can be attained only through an aggressive educational and promotional effort by the covered utilities. All electric and gas utilities which have sales, other than resale, exceeding 750 million kWh of electricity or 10 billion cubic feet of gas and participating home-heating suppliers, shall provide a program announcement and shall offer conservation services to their customers who occupy a residential building containing at least one, but not more than four units, in a manner as provided by the rules. The text of the rules is presented. (MCW)

  17. Final report on implementation of energy conservation practices training in selected public housing developments

    SciTech Connect

    Not Available

    1991-10-01

    This report on the implementation of energy conservation practices training in selected public housing developments represents an initiative of the Research and Education Division, Office of Minority Economic Impact, US Department of Energy. The Office of Minority Economic Impact (MI) was created by Congress in 1979, within the US Department of Energy, to afford the Secretary advice on the effect policies, regulations and other actions of DOE respecting minority participation in energy programs. The Director of MI is responsible for the conduct of ongoing research into the effects, including socio-economic and environmental, of national energy programs, policies, and regulations of the Department of minorities. Public housing in the United States is dominated by minorities, public housing is a large consumer of residential energy. Consequently, this project is a logical merging of these two factors and an attempt to somehow influence energy savings through improving public housing residents` energy-consumption practices. This final report attempts to capture the results of this current demonstration, and incorporate the historical basis for today`s results by renewing the efforts that preceded the implementation of energy conservation practices training in selected public housing developments.

  18. Final report on implementation of energy conservation practices training in selected public housing developments

    SciTech Connect

    Not Available

    1991-10-01

    This report on the implementation of energy conservation practices training in selected public housing developments represents an initiative of the Research and Education Division, Office of Minority Economic Impact, US Department of Energy. The Office of Minority Economic Impact (MI) was created by Congress in 1979, within the US Department of Energy, to afford the Secretary advice on the effect policies, regulations and other actions of DOE respecting minority participation in energy programs. The Director of MI is responsible for the conduct of ongoing research into the effects, including socio-economic and environmental, of national energy programs, policies, and regulations of the Department of minorities. Public housing in the United States is dominated by minorities, public housing is a large consumer of residential energy. Consequently, this project is a logical merging of these two factors and an attempt to somehow influence energy savings through improving public housing residents' energy-consumption practices. This final report attempts to capture the results of this current demonstration, and incorporate the historical basis for today's results by renewing the efforts that preceded the implementation of energy conservation practices training in selected public housing developments.

  19. Energy and Water Conservation Curriculum Development in Irrigation Technology for the Pacific Northwest. Final Report.

    ERIC Educational Resources Information Center

    Peterson, James R.

    This project was conducted to develop curriculum materials for classes in energy and water conservation for the Irrigation Technology Program at Walla Walla Community College. To develop the curriculum, the principal investigator read and analyzed materials on the subjects of water and energy conservation, participated in a short course on drip…

  20. Monitoring conservative retrofits in single family buildings. Final technical report

    SciTech Connect

    Richardson, C.S.

    1992-12-06

    This study has provided detailed before-and-after information on the ambient and comfort conditions in nine single family buildings, and on the energy consumption of those buildings, for one or more energy conservation retrofits. The data were recorded in such a manner that as well as being able to determine the savings from the retrofits and the influence these retrofits have on the comfort conditions of the residence, the effects of the retrofits on time-of-day usage are also determinable. The following are included in appendices: a table of participant`s names, site addresses and retrofit; significant dates and appropriate comments; a day of data and an annotated data set; pre-retrofit and post-retrofit audit data sheets; and usage history.

  1. The Education North Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    Ingram, E. J.; McIntosh, R. G.

    The Education North Evaluation Project monitored operation of the Education North Project (a 1978-82 project aimed at encouraging parents, teachers, and other community members in small, isolated northern Alberta communities to work together in improving the quality of education for school-aged children), assessed project outcomes, and developed…

  2. Colorado Better Buildings Project Final Report

    SciTech Connect

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  3. TX-100 manufacturing final project report.

    SciTech Connect

    Ashwill, Thomas D.; Berry, Derek S.

    2007-11-01

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three

  4. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  5. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  6. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  7. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  8. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Project Review Under Section 3.8 of the Compact § 401.36 Water...

  9. The Midwest State Archives Guide Project: An Evaluation. [Final Report.

    ERIC Educational Resources Information Center

    Evans, Max J.; And Others

    This document serves as the final report to the National Historical Publications and Records Commission (NHPRC) of the work of the Midwest State Archives Guide Project. The project involved the state archives in Minnesota, Illinois, Indiana, and Wisconsin, and was expected to contribute to a projected national guide project database, though when…

  10. Energy Conservation Projects to Benefit the Railroad Industry

    SciTech Connect

    Clifford Mirman; Promod Vohra

    2009-12-31

    The Energy Conservation Projects to benefit the railroad industry using the Norfolk Southern Company as a model for the railroad industry has five unique tasks which are in areas of importance within the rail industry, and specifically in the area of energy conservation. The NIU Engineering and Technology research team looked at five significant areas in which research and development work can provide unique solutions to the railroad industry in energy the conservation. (1) Alternate Fuels - An examination of various blends of bio-based diesel fuels for the railroad industry, using Norfolk Southern as a model for the industry. The team determined that bio-diesel fuel is a suitable alternative to using straight diesel fuel, however, the cost and availability across the country varies to a great extent. (2) Utilization of fuel cells for locomotive power systems - While the application of the fuel cell has been successfully demonstrated in the passenger car, this is a very advanced topic for the railroad industry. There are many safety and power issues that the research team examined. (3) Thermal and emission reduction for current large scale diesel engines - The current locomotive system generates large amount of heat through engine cooling and heat dissipation when the traction motors are used to decelerate the train. The research team evaluated thermal management systems to efficiently deal with large thermal loads developed by the operating engines. (4) Use of Composite and Exotic Replacement Materials - Research team redesigned various components using new materials, coatings, and processes to provide the needed protection. Through design, analysis, and testing, new parts that can withstand the hostile environments were developed. (5) Tribology Applications - Identification of tribology issues in the Railroad industry which play a significant role in the improvement of energy usage. Research team analyzed and developed solutions which resulted in friction

  11. Energy Storage and Distributed Energy Generation Project, Final Project Report

    SciTech Connect

    Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

    2008-03-31

    This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

  12. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  13. Real world financing opportunities for energy conservation projects

    SciTech Connect

    Tramonte, D.J.

    1988-01-01

    Do you have the resources, dollars, people expertise and general know-how to do all the energy conservation measures. If you have the funds, do it yourself. Historically you would save more if you hired a private concern because that is the only job the contractor does for you. You have other hats to wear and fires to put out. Using third-party financing can be a good decision based on your specific needs. Procrastination is not the answer - the cost of delay is extensive. Financing energy conservation measures is no different from financing your automobile or home. If the benefits outweigh the negatives, the answer is obvious. Remember, in any case of using private sector financing, your are joining a partnership arrangement. The only way to succeed is to be honest with each other on the front end. There need not be any surprises. Any reputable company will gladly have your attorney evaluate all agreements, amortization schedules, and attachments. Real world financing alternatives will continue to change as the market matures. It's not too good to be true. It is no more than a vehicle to make the efforts of capital improvements streamlined. The money or financing is the catalyst to the project and makes the other areas meld.

  14. Shrimp monitor/locator for conservation of fuel. Final report

    SciTech Connect

    Not Available

    1980-01-01

    A demonstration project of a new type Shrimp Detector/Monitor has been completed. The test project proved the efficiency of the Shrimp Monitor/Detector in detecting shrimp, in identifying the number and size, in real time, but indicated that improvement could be effected which would enhance the operation. Data obtained from the test cruises indicate significant savings in diesel fuel will occur for those trawlers using the Shrimp Monitor/Detector in place of the usual trynet operation; 25% savings for the series model number 400, (the prototype tested) and expected 35%+ if the advanced series model number 500 were used. Fabrication and operational costs for the Shrimp Monitor/Detector are reasonable and well within the financial abilities of the usual large offshore trawler. Research and testing during this program resulted in the design of an advanced model incorporating significant improvements, and fabrication was commenced but the extra cost involved beyond the set value of this contract made the further experiments non-viable. Recommendations have been submitted for an extended program to fabricate and test the advanced model series number 500 which may be of more value and interest, market use, to the operating offshore shrimp trawlers. A marketing/sales program will be instituted to place the Shrimp Monitor/Detector in the commercial area serving the shrimp fleet.

  15. The Conservation Effects Assessment Project (CEAP): The U.S. experience in determining a national scale natural resource and conservation needs assessment

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Conservation Effects Assessment Project (CEAP) was initiated to establish a scientific understanding of the impacts of agricultural conservation practices at the watershed scale, to quantify agricultural conservation practice benefits at the national and regional scales, and to identify outstand...

  16. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Hobble Creek Restoration Project Final Environmental Assessment AGENCY: Office of the Assistant Secretary... with the Final Environmental Assessment--East Hobble Creek Restoration Project. These two agencies have... Restoration Project. The Final Environmental Assessment has been completed in conjunction with the June...

  17. Rural Textile Workers Literacy Enhancement Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This document consists of the final report and sample curricula from the Rural Textile Workers Literacy Enhancement Project. The final report details how the project was initiated in April 1993 to help employees of five textile and apparel manufacturing companies in southeastern Alabama improve their literacy and numeracy skills. A second…

  18. The Conservation Effects Assessment Project (CEAP): a national scale natural resources and conservation needs assessment and decision support tool

    NASA Astrophysics Data System (ADS)

    Johnson, M.-V. V.; Norfleet, M. L.; Atwood, J. D.; Behrman, K. D.; Kiniry, J. R.; Arnold, J. G.; White, M. J.; Williams, J.

    2015-07-01

    The Conservation Effects Assessment Project (CEAP) was initiated to quantify the impacts of agricultural conservation practices at the watershed, regional, and national scales across the United States. Representative cropland acres in all major U.S. watersheds were surveyed in 2003-2006 as part of the seminal CEAP Cropland National Assessment. Two process-based models, the Agricultural Policy Environmental eXtender(APEX) and the Soil Water Assessment Tool (SWAT), were applied to the survey data to provide a quantitative assessment of current conservation practice impacts, establish a benchmark against which future conservation trends and efforts could be measured, and identify outstanding conservation concerns. The flexibility of these models and the unprecedented amount of data on current conservation practices across the country enabled Cropland CEAP to meet its Congressional mandate of quantifying the value of current conservation practices. It also enabled scientifically grounded exploration of a variety of conservation scenarios, empowering CEAP to not only inform on past successes and additional needs, but to also provide a decision support tool to help guide future policy development and conservation practice decision making. The CEAP effort will repeat the national survey in 2015-2016, enabling CEAP to provide analyses of emergent conservation trends, outstanding needs, and potential costs and benefits of pursuing various treatment scenarios for all agricultural watersheds across the United States.

  19. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  20. VTAE Economic Development Project. Final Report.

    ERIC Educational Resources Information Center

    Klitzke, Elizabeth

    A project was undertaken to redefine the role of vocational, technical, and adult education (VTAE) in economic development in Wisconsin. Included among the objectives of the project were the following: to produce a statewide plan for economic development identifying new linkages among business, industry, labor, and the VTAE system; to develop…

  1. Case Decision Project. Final Report (Process Evaluation).

    ERIC Educational Resources Information Center

    McDaniel, Garry

    The goal of the Case Decision Project (CDP) was to develop a method to improve the efficiency and effectiveness of program management in child protective services in Texas. At the onset of the project, workers across the state had no uniform method of obtaining case information. Therefore, an automated case investigation system was developed.…

  2. Project Final Report: HPC-Colony II

    SciTech Connect

    Jones, Terry R; Kale, Laxmikant V; Moreira, Jose

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  3. Informed Instruction in Mathematics. Final Project Report.

    ERIC Educational Resources Information Center

    Woodward, John; And Others

    This report describes the results of a three-year study, the Informed Instruction Project, that investigated different approaches to mathematics instruction for students with learning disabilities and at-risk for special education services. The project focused on two strands of inquiry: (1) the effects of a computer-based diagnostic assessment…

  4. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  5. Migrant Education Dropout Prevention Project. Final Report.

    ERIC Educational Resources Information Center

    Santa Clara County Office of Education, San Jose, CA.

    The Migrant Education Region 1 of the Santa Clara County Office of Education organized a project to examine the conditions of 1454 migrant students in a sample of northern California schools. The project had two primary components: (1) the collection and analysis of information about migrant students, their family and school situations, and their…

  6. Northern Native Languages Project. Final Report.

    ERIC Educational Resources Information Center

    Burnaby, Barbara; And Others

    The Northern Native Language Project was constituted in June 1979 to produce a report which would present information on the present situation regarding language education schools in the project area of Ontario (James Bay, Nakina, and Sioux Lookout) and to make recommendations concerning appropriate action for the future. The introduction of the…

  7. Basic/Technical Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    White River Vocational Technical School, Newport, AR.

    The Basic/Technical Literacy project at White River Vocational Technical School in Arkansas implemented a comprehensive curriculum to raise students' basic reading and technical literacy levels in their chosen skill area. During the project, master vocabulary lists for each skill area were developed, and self-test worksheets and study guides were…

  8. FIP Interim Review Project. Final Report.

    ERIC Educational Resources Information Center

    Whitbeck, John K.

    The Family Independence Project (FIP) Interim Review Project in Washington was mounted in order to give preliminary information on the progress of the FIP program compared to Assistance for Families with Dependent Children (AFDC) site activity, for management planning, and to document short-term outcomes and trends for policy considerations. A…

  9. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  10. Skill Standards and Certification Project. Final Document.

    ERIC Educational Resources Information Center

    North Lake Coll., Irving, TX.

    This document contains the report of a project conducted to make the concept of a world-class work force a reality. The project was intended to design a comprehensive strategy to link elements from the state's existing vocational-technical education, job training, adult education, tech prep, and apprenticeship programs with the components of SCANS…

  11. Tellin' Stories Project. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Ziegler, Mary F.

    The Tellin' Stories Project in Washington, DC, was developed to increase the involvement of economically disadvantaged, often limited English-speaking parents in the educational process of their children. The project connected parents, educators, schools, and communities. The third-year evaluation process consisted of these activities: a focus…

  12. Hispanic Vocational Exploration Project. Final Report.

    ERIC Educational Resources Information Center

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  13. Montana Labor Mobility Project-6716. Final Report.

    ERIC Educational Resources Information Center

    Montana State Employment Service, Helena.

    The report is concerned with the third labor mobility project of the Montana State Employment Service. As it had done previously, the project originally intended undertaking relocation of unemployed persons registered with ES offices throughout the state. However, a large layoff of copper miners in the State during the Spring of 1968 made it…

  14. ADD Special Projects Grant. Final Report.

    ERIC Educational Resources Information Center

    Wortham, Jocelyn F.

    The purpose of this five-year project was to prepare administrators, general and special education teachers, and parents to meet the needs of children with attention deficit hyperactivity disorders (ADHD). The project developed five self-instructional ADHD inservice preparation manuals for national and state dissemination and implemented an ADHD…

  15. Project D. E. A. F. Final Report.

    ERIC Educational Resources Information Center

    Hairston, Ernest E.

    Project D.E.A.F., its introduction and background, purpose, clientele, methodology, and activities, are described. Project D.E.A.F. was established by an expansion grant from the Rehabilitation Service Administration of the Department of Health, Education and Welfare, in cooperation with the Ohio Bureau of Vocational Rehabilitation for the purpose…

  16. Science for the Eighties: Final Project Report.

    ERIC Educational Resources Information Center

    Magidson, Errol M.

    This report summarizes the goals, objectives, and activities of a project conducted at Kennedy-King College to provide the time and resources for instructors to develop multi-media curriculum materials for use in biology, psychology, and social science courses. Introductory material outlines project objectives in terms of resource development and…

  17. The final focus test beam project

    SciTech Connect

    Burke, D.

    1991-05-01

    An overview is given of the Final Focus Test Beam (FFTB) that is being constructed as a prototype final focus system for a future electron-positron linear collider. This beam line will use as input the 50 GeV electron beam from the SLC linac, and is designed to reduce the transverse dimensions of the beam spot at the focal point to 1 {mu}m. 5 refs., 2 figs., 1 tab.

  18. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  19. Salt River Project`s participation in Arizona`s bald eagle conservation efforts

    SciTech Connect

    Nobel, T.A.

    1996-11-01

    Bald eagle (Haliaeetus leucocephalus) conservation in Arizona, USA, is a prime example of a successful, cooperative environmental management effort. The Salt River Project (SRP) is an active participant in the statewide bald eagle management activities. This paper summarizes the major components of the statewide program and highlights SRP`s participation in these efforts. The Southwestern Bald Eagle Management Committee (SWBEMC) was formed as a means of coordinating interagency projects. Chaired by the Arizona Game and Fish Department (AGFD), the SWBEMC is comprised of 15 state, federal, tribal, and private agencies. Together, these agencies sponsor the Nest Watch Program, a unique and effective program dedicated to the study, conservation, and recovery of bald eagles in the southwest. Other significant components of the bald eagle management program include nest monitoring, nest search activities, winter counts, and demography studies. 7 refs., 4 figs.

  20. Pagosa Springs geothermal project. Final technical report

    SciTech Connect

    Not Available

    1984-10-19

    This booklet discusses some ideas and methods for using Colorado geothermal energy. A project installed in Pagosa Springs, which consists of a pipeline laid down 8th street with service to residences retrofitted to geothermal space heating, is described. (ACR)

  1. Smart Gun Technology project. Final report

    SciTech Connect

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  2. Wyoming Department of Education Deaf-Blind Project Final Report.

    ERIC Educational Resources Information Center

    Whitson, Joanne B.

    This final report describes activities and accomplishments of the Wyoming Department of Education Deaf-Blind Project, a 4-year federally supported project to identify children who have deaf-blindness and to provide technical assistance in the development of educational services for these children. Major accomplishments of the project included:…

  3. Project Pride. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Greene, Judy

    Project Pride was an Elementary and Secondary Education Act Title VII-funded project for Haitian-born students. The project was in its fifth and final year in 1993-94 at Erasmus Hall High School in Brooklyn (New York). Participating students (n=158) received instruction in English as a Second Language (ESL), native language arts (NLA), and the…

  4. 2+2+2 Dissemination Project Final Report.

    ERIC Educational Resources Information Center

    Sloane, Diana; And Others

    An overview is provided in this three-part final report of a project designed to disseminate information to assist California high schools, Regional Occupation Programs, and colleges in developing and strengthening 2+2+2 programs. Part I reviews the following project objectives: (1) hire a project coordinator and technical assistant; (2) develop a…

  5. The NICU Follow-Through Project. Final Report.

    ERIC Educational Resources Information Center

    Bennett, Forrest C.; Hedlund, Rodd E.

    This final report describes activities and accomplishments of the NICU Follow-Through Project, a 3-year project designed to help hospital neonatal intensive care units (NICUs) and community developmental centers serving infants with disabilities or very low birth weights (VLBW) replicate the project's innovative and successful training components.…

  6. Final Year Engineering Projects in Australia and Europe

    ERIC Educational Resources Information Center

    Ku, H.; Goh, S.

    2010-01-01

    The paper starts by emphasising that final year engineering projects are regarded important in the training and education of professional engineers in Australia and Europe. The sources of projects available to students were also mentioned. Some Australian universities insist on individual projects but some not, each with their own reasons.…

  7. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all...

  8. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all...

  9. Sustaining Jamaica's forests: The protected areas resource conservation project

    NASA Astrophysics Data System (ADS)

    Berke, Philip R.; Beatley, Timothy

    1995-07-01

    This study examines Jamaica's attempt to protect a tropical forest reserve. The biophysical setting, and the types and magnitude of forest development pressures are reviewed. Next, Jamaica's approach to developing new land-use strategies and compatible environmental protection and economic development programs are examined. Finally, the practical and theoretical implications by which institutions can be designed to encourage planning for sustainable development are reviewed. The implications suggest how to provide an appropriate mix of cooperation and market competition, by which people acting in their own interests accomplish socially equitable economic development, while protecting the environment for the benefit of future generations. The experience illustrates that effective long-term protection of natural areas requires the building of local relationships and support, the development of local economic activities supportive of conservation, the defining of clear boundaries, and significant monitoring and enforcement. Long-term protection of the Blue and John Crow mountains, and other important natural areas of Jamaica, will also require the development of a workable and enforceable system of land-use planning for the island, and adjustments to the economic incentive structure so that sustainable, nonextractive uses of natural capital are placed on equal footing with other economic uses (e.g., coffee production).

  10. NYU Ultracomputer project. Final project summary, 1979-1993

    SciTech Connect

    Gottlieb, A.

    1994-10-01

    This report discusses the following on the Ultracomputer project: simulation studies; network analysis; prototype hardware; VSLI design; coordination algorithms; systems software; application software; and compiler development.

  11. Javanese-English Dictionary Project. Final Report.

    ERIC Educational Resources Information Center

    Horne, Elinor Clark

    The purpose of the research covered by this final report was to produce a Javanese-English dictionary, the first ever to exist. Source materials were of two major kinds: (1) pre-Revolution sources: the two most recetnly published Javanese dictionaries (see Bibliography, Pigeaud and Poerwadarminta), predating the 1945 Indonesian war for…

  12. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  13. Math Network Curriculum Project. Project Summary; Final Report.

    ERIC Educational Resources Information Center

    San Francisco State Univ., CA.

    This document summarizes the work of the Math Curriculum Project at San Francisco State University. The project developed seven curriculum units for the middle school mathematics program, using microcomputers as a problem solving tool to foster mathematical thinking and develop insights into mathematical concepts. They also created a prototype…

  14. Energy Conservation: Field Projects. Phase 2: External Evaluation. Document 1: Report.

    ERIC Educational Resources Information Center

    Stanley Associates, Edmonton (Alberta).

    Objectives of Phase 2: Energy Conservation Field Projects were to: test the generalizability of the energy conservation measures outlined in "Guidelines for Conserving Energy in Alberta Schools" and augment these guidelines as required; develop standards of energy consumption for Alberta schools by school type and size, and on the basis of…

  15. Energy Conservation Field Projects. Phase 2: External Evaluation. Document II: Appendices.

    ERIC Educational Resources Information Center

    Stanley Associates, Edmonton (Alberta).

    Provided are appendices which contain supporting documentation related to an external evaluation of the Phase 2: Energy Conservation Field Projects. Objectives of this program were to: test the generalizability of the energy conservations measures outlined in "Guidelines for Conserving Energy in Alberta Schools" and augment these guidelines as…

  16. ADD Teacher Inservice Project. Final Grant Report.

    ERIC Educational Resources Information Center

    Edwards, Mark C.; Schulz, Eldon G.

    The report describes activities and achievements of the Attention Deficit Disorder (ADD) Teacher Inservice Project. The inservice program was developed using a formal process to identify the critical issues related to ADD awareness, assessment, and intervention. Program content was designed to address critical issues identified in the research…

  17. Labor Exchange Skills Project. Final Report.

    ERIC Educational Resources Information Center

    Dietrich, Eleanor; Hendrickson-Larson, Joanna; Hoppe, Ruth; Paige, Bruce; Rosenow, Steve

    The Labor Exchange Skills Project, which was conducted under the sponsorship and direction of the U.S. Department of Labor, Employment and Training Administration, was designed to develop a labor exchange skills database (ETA) that would improve the usability of many Department of Labor applications and products developed by other public and…

  18. Performance Metrics Research Project - Final Report

    SciTech Connect

    Deru, M.; Torcellini, P.

    2005-10-01

    NREL began work for DOE on this project to standardize the measurement and characterization of building energy performance. NREL's primary research objectives were to determine which performance metrics have greatest value for determining energy performance and to develop standard definitions and methods of measuring and reporting that performance.

  19. Graduate/Employer Followup Project. Final Report.

    ERIC Educational Resources Information Center

    Ohanneson, Greg; And Others

    A project was undertaken to explore the prospects of conducting employer followup surveys concerning the graduates of a selected vocational program and to devise a procedure that would categorize the small number of employers to be sampled in such a way that useful data for possible program change could be obtained and analyzed. During the…

  20. Trucking Industry Training Project. Final Report.

    ERIC Educational Resources Information Center

    Sanburn, Donald D.

    The report was prepared under a grant made to investigate the possibilities of establishing an organized system of training for the trucking industry. It discusses attempts to disseminate information on training, learned through operation of an experimental and demonstration project in Pico Rivera, California. It discusses problems of compliance…

  1. Microprocessors in Education Research Project. Final Report.

    ERIC Educational Resources Information Center

    Avons, S. E.; And Others

    This 3-year research project, centered on the cognitive psychology of child-computer interaction, focused on the use of microcomputers for teaching specific topics in mathematics and science. In particular, issues arising from the use of computer-based simulations to promote learning (including the nature of the information displayed, the degree…

  2. Southeast geysers effluent pipeline project. Final report

    SciTech Connect

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept was feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.

  3. American History Laboratory Project. Final Report.

    ERIC Educational Resources Information Center

    Taylor, William R.

    The results of an experimental project in American history which introduced to students the methods of historical investigation in specific historical areas through small group research rather than through the college survey course are described in this report. Discussed are (1) the course organization, consisting of two semester units in which…

  4. College Cost Containment Project. Final Report.

    ERIC Educational Resources Information Center

    Lemke, Darrell

    In response to serious concerns about the dramatic increases in college and university costs, the Department of Education solicited proposals in May 1987 for innovative projects to explore means of cost reduction or containment which promise significant cost savings, whether accrued in the short- or long-term. The solicitation for cost containment…

  5. HOSPITALITY EDUCATION CURRICULUM DEVELOPMENT PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    DOMMER, CAROLYN

    THE PURPOSE OF THE PROJECT WAS TO GAIN INFORMATION USEFUL IN DEVELOPING PROGRAMS FOR PREPARING PERSONS FOR EMPLOYMENT IN OCCUPATIONS INVOLVING HOME ECONOMICS KNOWLEDGE AND SKILLS AND FOR PREPARING TEACHERS. THE INITIAL CURRICULUM IN HOSPITALITY EDUCATION, TRAINING IN TRADE AND PERSONAL SERVICE OCCUPATIONS PROVIDING FOOD, LODGING, AND RECREATION,…

  6. Workplace Environmental Literacy Project (WELP). Final Report.

    ERIC Educational Resources Information Center

    North Orange County Community Coll. District, Fullerton, CA.

    A project was conducted to determine formal and informal competencies based on an expanded definition of workplace environmental literacy. A secondary goal was to develop a compact between employers and training program graduates whereby graduates would have preferential access to employment opportunities. Issues that arose during the…

  7. HOME HEALTH AIDE TRAINING PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    Greater New Haven Community Council, CT.

    THE HOME HEALTH AIDE PERFORMS SIMPLE PERSONAL CARE FUNCTIONS UNDER NURSING SUPERVISION IN THE HOME CARE OF AN ILL OR DISABLED PERSON. THE PROJECT OBJECTIVES WERE TO TRAIN AS AIDES 30 MEN AND WOMEN AGE 45 YEARS AND OLDER WITH LIMITED INCOMES TO MEET A COMMUNITY EMPLOYMENT NEED AND TO EXPERIMENT IN RECRUITMENT, SELECTION, TRAINING, AND EMPLOYMENT…

  8. Language Integrated Technology Project Final Evaluation Report.

    ERIC Educational Resources Information Center

    Stiegemeier, Lois

    The goal of the Language Integrated Technology Grant Project (LIT) consortium was to help provide critical components of successful reading programs through a combination of proven computer/print programs and teacher training. Through leadership provided by the Educational Service District 113 (Olympia, Washington), the LIT consortium of schools…

  9. Jefferson County Adult Reading Project. Final Report.

    ERIC Educational Resources Information Center

    Jefferson County Board of Education, Louisville, KY.

    The 1980-81 Jefferson County (Kentucky) Adult Reading Program served 601 students functioning below 6.0 grade level during the 1980-81 year. The project's instructional methods and materials were developed based on the experiences of the program for the previous two years. The program was considered a success not only from the viewpoint of the…

  10. Employer Needs Assessment Project: Final Report.

    ERIC Educational Resources Information Center

    Klinman, Debra G.

    In the summer and spring of 1980 Mercer County Community College undertook a large-scale employer needs assessment project, during which 1,140 Mercer County employers were contacted in order to: (1) assess employers' practices and preferences in the recruitment of personnel; (2) determine employer satisfaction with the College's ability to educate…

  11. Workplace Skills Enhancement Project. Final Report.

    ERIC Educational Resources Information Center

    Seattle-King County Private Industry Council, Seattle, WA.

    The Workplace Skills Enhancement Project was provided by the Seattle-King County Private Industry Council in Partnership with the Employment Opportunities Center and the Refugee Federation Service Center. Of the 150 participants in the program, 137 were Asian. Workplace literacy training was generally advertised as a voluntary program available to…

  12. Elderly Service Workers' Training Project. Final Report.

    ERIC Educational Resources Information Center

    Harvey, Dexter; Cap, Orest

    The Elderly Service Workers' Training Project (ESWTP) was designed to identify the problems encountered by human service workers in their daily contact with older adults. A needs assessment (mail survey and structured personal interview) was conducted throughout Manitoba to identify and document the scope of human service workers' on-the-job…

  13. Minewater heat recovery project. Final Technical report

    SciTech Connect

    1992-04-01

    This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

  14. Vermont gasifier project. Final report, Phase I

    SciTech Connect

    1995-07-01

    This report presents an engineering status report for the Vermont gasifier project. Technical areas of concern are discussed with the cyclone performance, agglomeration problems in the combustor, particlate emissions, valve design, deflagration venting, gasifier and combustion blower surge control, and other related areas. Attachments pertaining to the drawing and specification register are included.

  15. Bilingual Adult Basic Education Project. Final Report.

    ERIC Educational Resources Information Center

    Graham, Janet Roth

    The Bilingual Adult Basic Education Project provided bilingual life skills instruction, counseling, and informational services to approximately 150 non-English-dominant adults across Pennsylvania by means of contracts to local education agencies. Students were pre- and post-tested in English and/or their native language to measure their growth in…

  16. Native Hawaiian Educational Assessment Project. Final Report.

    ERIC Educational Resources Information Center

    Kamehameha Schools/Bernice Pauahi Bishop Estate, Honolulu, HI.

    This report documents the educational needs of Native Hawaiians across ecosystem levels. Identifying the unique educational needs of Native Hawaiians and effective Native American and local programs that meet the unique educational needs of native Hawaiians, this project works within certain parameters: (1) part of a continuous needs assessment,…

  17. Final Report, SD-265; Project TACT.

    ERIC Educational Resources Information Center

    Air Force Systems Command, L.G. Hanscom Field, MA. Electronic Systems Div.

    The project objective has been to determine what creative thought processes can best take advantage of new technology in computer hardware and software. The plan has been to acquire or develop on-line computer systems of significant mathematical power, and to explore their use in vivo in teaching and research situations. The main product of…

  18. Coal Manpower Projections: 1980. Final Report.

    ERIC Educational Resources Information Center

    Clague, Ewan

    The National Petroleum Council has projected a 1980 bituminous coal production of 910 million tons. On that basis, the study estimates the manpower which will be required to produce that volume of coal. On the assumption of a productivity increase of two percent per year from 1974 onwards, the 1980 coal output will require a work force of…

  19. Project Reach: Final Report--Year 2.

    ERIC Educational Resources Information Center

    McClelland, Samuel D.

    The second year of Project Reach, a Federally funded two-year program, pursued two tactics for increasing the adult basic education (ABE) program relevance and effectiveness in South Bend, Indiana: (1) the training/hiring of ABE students as media paraprofessionals, and (2) a media enrollment campaign of various media promotions (television/radio…

  20. The MICA Project: A Final Look.

    ERIC Educational Resources Information Center

    Roecks, Alan L.

    1979-01-01

    Evaluation of the MICA project (management of instruction with computer assistance) revealed that the supporting software system was efficient and cost-effective, the instruction was adequate, there was no difference in student achievement, and few changes were necessary in order to implement the program. (Author/IRT)

  1. Project Stretch Final Narrative Report. Year III.

    ERIC Educational Resources Information Center

    American Camping Association, Martinsville, IN.

    In June, 1979, the American Camping Association implemented Project STRETCH (Strategies to Try out Resources to Enhance the Training of Camp Directors serving the Handicapped), a nationwide in-service training program for personnel providing services to handicapped children and youth in regularly and specially designed camping and outdoor…

  2. Physically Handicapped in Science: Final Project Report.

    ERIC Educational Resources Information Center

    O'Brien, Maureen B.; And Others

    A two-year project was conducted by St. Mary's Junior College to improve the science literacy of visually-impaired students (VIS) through the adaptation of instructional methods and materials. A four-step process was used: (1) learning materials were reviewed to identify problem areas; (2) preliminary adaptations were made based on the review; (3)…

  3. VTAE Professional Development Project. Final Report.

    ERIC Educational Resources Information Center

    Strohbusch, Mark; Baldus, Lorayne

    A project was undertaken to coordinate up-to-date staff professional development on a regional or state basis in the state of Wisconsin. An earlier study had recommended more specific information and hiring of a staff development coordinator. The "Coordination of Efforts in the Vocational, Technical, and Adult Education (VTAE) System for Specific…

  4. Virginia Labor Mobility Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Virginia Employment Commission, Richmond. Research, Statistics, and Information Div.

    The Appalachian region of Southwest Virginia was selected as a surplus labor area in a pilot project to show the effectiveness of using financial assistance to increase mobility and reduce unemployment. Most of the workers were relocated in Alexandria, Newport News, Richmond, and Petersburg. Of the 920 unemployed workers interviewed, 200 were…

  5. Final Project Report Project 10749-4.2.2.1 2007-2009

    SciTech Connect

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  6. 78 FR 51205 - Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... invasive species control and eradication and pursue habitat restoration on offshore cays. Within 5 years of... Fish and Wildlife Service Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No Significant Impact for the Environmental Assessment AGENCY: Fish and...

  7. 75 FR 34151 - Availability: Final Comprehensive Conservation Plan and Finding of No Significant Impact; Modoc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... managers with a 15-year plan for achieving refuge purposes and contributing toward the mission of the... press releases, updates to constituents, and a Federal Register notice (74 FR 28271, June 15, 2009). The... Fish and Wildlife Service Availability: Final Comprehensive Conservation Plan and Finding of...

  8. 76 FR 50247 - Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Fish and Wildlife Service Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce...

  9. 76 FR 1190 - Back Bay National Wildlife Refuge, City of Virginia Beach, VA; Final Comprehensive Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... Fish and Wildlife Service Back Bay National Wildlife Refuge, City of Virginia Beach, VA; Final Comprehensive Conservation Plan and Finding of No Significant Impact for Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish...

  10. 78 FR 24228 - Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final Comprehensive Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... review and comment following the announcement in the Federal Register on October 29, 2012 ] (77 FR 65574... Fish and Wildlife Service Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final... conservation plan and finding of no significant impact (FONSI) for the Lake Andes National Wildlife...

  11. Final performance report for Project JEM

    SciTech Connect

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  12. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  13. Alaska Wood Biomass Energy Project Final Report

    SciTech Connect

    Jonathan Bolling

    2009-03-02

    The purpose of the Craig Wood Fired Boiler Project is to use waste wood from local sawmilling operations to provide heat to local public buildings, in an effort to reduce the cost of operating those buildings, and put to productive use a byproduct from the wood milling process that otherwise presents an expense to local mills. The scope of the project included the acquisition of a wood boiler and the delivery systems to feed wood fuel to it, the construction of a building to house the boiler and delivery systems, and connection of the boiler facility to three buildings that will benefit from heat generated by the boiler: the Craig Aquatic Center, the Craig Elementary School, and the Craig Middle School buildings.

  14. Fuel Cell Forklift Project Final Report

    SciTech Connect

    Cummings, Clifton C

    2013-10-23

    This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

  15. Baltimore residential assistance demonstration project: Final report

    SciTech Connect

    1998-09-01

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  16. Manzanita Hybrid Power system Project Final Report

    SciTech Connect

    Trisha Frank

    2005-03-31

    The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit, and in 1995 the Tribe established the Manzanita Renewable Energy Office. Through the U.S. Department of Energy's Tribal Energy Program the Band received funds to install a hybrid renewable power system to provide electricity to one of the tribal community buildings, the Manzanita Activities Center (MAC building). The project began September 30, 1999 and was completed March 31, 2005. The system was designed and the equipment supplied by Northern Power Systems, Inc, an engineering company with expertise in renewable hybrid system design and development. Personnel of the National Renewable Energy Laboratory provided technical assistance in system design, and continued to provide technical assistance in system monitoring. The grid-connected renewable hybrid wind/photovoltaic system provides a demonstration of a solar/wind energy hybrid power-generating project on Manzanita Tribal land. During the system design phase, the National Renewable Energy Lab estimated that the wind turbine is expected to produce 10,000-kilowatt hours per year and the solar array 2,000-kilowatt hours per year. The hybrid system was designed to provide approximately 80 percent of the electricity used annually in the MAC building. The project proposed to demonstrate that this kind of a system design would provide highly reliable renewable power for community uses.

  17. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  18. Evaluation of the State Energy Conservation Program from program initiation to September 1978. Final report

    SciTech Connect

    Heller, James N.; Grossmann, John R.; Shochet, Susan; Bresler, Joel; Duggan, Noreene

    1980-03-01

    The State Energy Conservation Program was established in 1975 to promote energy conservation and to help states develop and implement their own conservation programs. Base (5) and supplemental (3) programs required states to implement programs including: mandatory thermal-efficiency standards and insulation requirements for new and renovated buildings; mandatory lighting efficiency standards for public buildings; mandatory standards and policies affecting the procurement practices of the state and its political subdivisions; program measures to promote the availability and use of carpools, vanpools, and public transportation; a traffic law or regulation which permits a right turn-on-red; and procedures to carry out a continuing public education effort to increase awareness of energy conservation; procedures which promote effective coordination among local, state, and Federal energy conservation programs; and procedures for carrying out energy audits on buildings and industrial plants. All 50 states and Puerto Rico, Guam, the Virgin Islands, American Samoa, and the District of Columbia participated in the program. The total 1980 energy savings projected by the states is about 5.9 quadrillion Btu's or about 7% of the DOE projected 1980 baseline consumption of just under 83 quads. The detailed summary is presented on the following: information the SECP evaluation; DOE response to the SECP; DOE's role in the program management process; the effectiveness of the states in managing the SECP; the status of program measure implementation; innovative state energy conservation programs; and the evaluation methodology.

  19. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    SciTech Connect

    Zhu, Jianting

    2010-03-11

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity and four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  20. ECP (Environmental Conservation Project) Report, No. 8, December 1976. ECP State Bibliography.

    ERIC Educational Resources Information Center

    Dean, Norman L., Ed.

    This issue of the Environmental Conservation Project (ECP) Report contains the second supplement to the "ECP State Bibliography," a collection of state energy legislation compiled by the Energy Conservation Project at the Environmental Law Institute. Earlier publications of state legislative actions appear in the October 1975 and January 1976…

  1. Cryogenic Barrier Demonstration Project. Final report

    SciTech Connect

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  2. Combined Final Report for Colony II Project

    SciTech Connect

    Kale, Laxmikant; Jones, Terry; Moreira, Jose

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the results obtained over the performance period of the project.

  3. Final Report. Montpelier District Energy Project

    SciTech Connect

    Baker, Jessie; Motyka, Kurt; Aja, Joe; Garabedian, Harold T.

    2015-03-30

    The City of Montpelier, in collaboration with the State of Vermont, developed a central heat plant fueled with locally harvested wood-chips and a thermal energy distribution system. The project provides renewable energy to heat a complex of state buildings and a mix of commercial, private and municipal buildings in downtown Montpelier. The State of Vermont operates the central heat plant and the system to heat the connected state buildings. The City of Montpelier accepts energy from the central heat plant and operates a thermal utility to heat buildings in downtown Montpelier which elected to take heat from the system.

  4. Raft River aquaculture project. Final report

    SciTech Connect

    Beleau, M.H.; Woiwode, J.G.

    1980-07-01

    The commercial potential for geothermal aquaculture was evaluated for 2 years at the Department of Energy's Raft River geothermal site in southcentral Idaho. Common carp '(Cyprinus carpio) and channel catfish (Ictalurus punctatus) were selected as culture species. Objectives of the study included investigation of: (1) growth rates; (2) nutrition trials; (3) histological and physiological parameters; (4) bioaccumulation of heavy metals; and (5) reproductive capacity. The second year project efforts were primarily studying the effects of geothermal water on the reproductive capacity of common carp by: (1) determining the effects of geothermal water on gonadal development of common carp; and (2) determining the effects of geothermal water on common carp embryogenesis.

  5. Fairbanks Geothermal Energy Project Final Report

    SciTech Connect

    Karl, Bernie

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  6. Emergency Fish Restoration Project; Final Report 2002.

    SciTech Connect

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  7. Final Report Navajo Transmission Project (NTP)

    SciTech Connect

    Bennie Hoisington; Steven Begay

    2006-09-14

    The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  8. Conservation Effects Assessment Project – CEAP – National Research Cooperation

    Technology Transfer Automated Retrieval System (TEKTRAN)

    CEAP is a multi-agency effort to quantify the environmental benefits of conservation practices used by private landowners participating in selected USDA conservation programs. Within CEAP are a national assessment, focusing on regional and national-scale modeling, and a watershed assessment of cropl...

  9. Project Energize: Outcomes of a Community Confernece on Energy Conservation.

    ERIC Educational Resources Information Center

    Driscoll, Patricia; Deshler, David

    Intended to help program planners and evaluators in providing insight as to what can be accomplished in an educational program dealing with energy conservation, this report is an evaluation of the outcomes of a community conference on energy conservation. There is a brief description of the day-long energy conference attended by 178 people (38 of…

  10. Solar Total Energy Project final test report

    SciTech Connect

    Nelson, R.F.; Abney, L.O.; Towner, M.L. )

    1990-09-01

    The Solar Total Energy Project (STEP), a cooperative effort between the United States Department of Energy (DOE) and Georgia Power Company (GPC) located at Shenandoah, Georgia, has undergone several design modifications based on experience from previous operations and test programs. The experiences encountered were discussed in detail in the Solar Total Energy Project Summary Report'' completed in 1987 for DOE. Most of the proposed changes discussed in this report were installed and tested in 1987 as part of two 15-day test programs (SNL Contract No. 06-3049). However, several of the suggested changes were not completed before 1988. These plant modifications include a new distributed control system for the balance of plant (BOP), a fiber a optical communications ring for the field control system, and new control configuration reflecting the new operational procedures caused by the plant modifications. These modifications were tested during a non-consecutive day test, and a 60-day field test conducted during the autumn of 1989. These test were partially funded by SNL under Contract No. 42-4859, dated June 22, 1989. Results of these tests and preliminary analysis are presented in this test summary report. 9 refs., 19 figs., 7 tabs.

  11. Final rapid reactivation project environmental assessment

    SciTech Connect

    1999-02-10

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA.

  12. The Management of Building Environment for Comfort and Energy Conservation. Final Report.

    ERIC Educational Resources Information Center

    North Seattle Community Coll., WA.

    This report presents materials from a Washington State project to develop a curriculum outline of three courses for energy conservation to be used in vocational supplement classes. It first presents results from an industrial survey on which engineers, architects, and mechanical contractors rated objectives for the three courses. Next are provided…

  13. [Discussion on water conservancy projects and schistosomiasis control in Poyang Lake area].

    PubMed

    Liu, Dao-Nan

    2013-02-01

    According to the schistosomiasis endemic situation in the Poyang Lake area, this paper analyzes the relationship between the water conservancy projects and schistosomiasis control, and reviews and discusses the effects of the Water Level Control Project of Poyang Lake, the Lake Dike Slope Hardening Project, and the Lifting Delta and Descending Beach Project on Oncomelania snail control. PMID:23687826

  14. First Years Together. Final Project Report. Project Enlightenment.

    ERIC Educational Resources Information Center

    Wake County Public School System, Raleigh, NC.

    First Years Together (FYT), a 3-year service and training demonstration project, provided services to 32 high risk or preterm babies and their parents in order to overcome the emotional and developmental effects of hospitalization and a worrisome start. Service was initiated shortly before each baby's discharge from the intensive care unit and…

  15. Physics of Correlated Systems, Final Project Report

    SciTech Connect

    Greene, Chris H.

    2014-06-25

    The funding of this DOE project has enabled the P.I. and his collaborators to tackle a number of problems involving nonperturbatively coupled atomic systems, including their interactions with each other and/or with an external electromagnetic field of the type provided by either a continuous-wave or a femtosecond short-pulse laser. The progress includes a new, deeper understanding of an old and famous theory of autoionization lineshapes, developed initially by Ugo Fano in 1935 and later extended in a highly cited 1961 article; the new result specifically is that in a collaboration with the Heidelberg group we have been able to demonstrate an unexpectedly simple behavior in the time domain that is relevant for modern short-pulse lasers. This study also demonstrates a way to modify and even control the lineshapes of unstable atomic and molecular energy levels.

  16. Advanced Blade Manufacturing Project - Final Report

    SciTech Connect

    POORE, ROBERT Z.

    1999-08-01

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  17. (Solar Greenhouse Employment Project). Final report

    SciTech Connect

    Not Available

    1985-01-01

    A project is presented that used workshops to develop the means for the building of low cost passive solar space and water heating devices for farm communities in Pittsboro, North Carolina. Not only the farm community, but also small town and urban people have enthusiastically participated. The reason for the participation in these efforts has been their availability as well as because the devices are low cost and they produce energy savings directly or indirectly. People have come together in workshops to build, for themselves, or others, devices (i.e., vertical wall collectors, window box collectors, bread box hot water heaters and solar greenhouses) that directly impact energy utilization. The frustration however has been that data on energy savings is anecdotal and that the participation of the agriculture community has been residentially related and not agriculturally related.

  18. Blade Manufacturing Improvement Project: Final Report

    SciTech Connect

    SHERWOOD, KENT

    2002-10-01

    The Blade Manufacturing Improvement Project explores new, unique and improved materials integrated with innovative manufacturing techniques that promise substantial economic enhancements for the fabrication of wind turbine blades. The primary objectives promote the development of advanced wind turbine blade manufacturing in ways that lower blade costs, cut rotor weight, reduce turbine maintenance costs, improve overall turbine quality and increase ongoing production reliability. Foam Matrix (FMI) has developed a wind turbine blade with an engineered foam core, incorporating advanced composite materials and using Resin Transfer Molding (RTM) processes to form a monolithic blade structure incorporating a single molding tool. Patented techniques are employed to increase blade load bearing capability and insure the uniform quality of the manufactured blade. In production quantities, FMI manufacturing innovations may return a sizable per blade cost reduction when compared to the cost of producing comparable blades with conventional methods.

  19. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  20. Potable water standards project. Final report

    SciTech Connect

    Styron, C.E.; Meyer, H.E.

    1981-04-07

    Under regulations known as the National Interim Primary Drinking Water Regulations, Title 40 - Code of Federal Regulations, Part 141, which became effective on June 24, 1977, the new standard for tritium in public drinking water (20 nCi/l) was 50 times lower than the Radioactivity Concentration Guide (RCG) in use by DOE. At that time it was apparent from data collected in the environmental surveillance program that three Mound wells and nine nearby private and community wells would be out of compliance, in some cases by a factor as high as four. Recognizing that previous actions taken to reduce the levels of tritium in airborne and liquid effluents would have to be supplemented by intensive efforts in order to bring tritium concentrations in local drinking water supplies into compliance with the EPA standard, the Potable Water Standards Project was initiated. A six-phase program was developed for achieving the goals of the project. Phase I had three parts: analyze all pertinent historical data on geohydrology and tritium in the environment for clues to the source or sources of tritium reaching the aquifer; determine needs for additional data to identify the source(s) of tritium; and define and initiate a rainout monitoring program to obtain data to be used in Phase III. Research in the other five phases was divided into the following categories: conduct a field program involving additional test borings, observation wells, and monitoring to obtain required data to identify source(s); model data, evaluate results, and identify source(s) of tritium; develop a program of corrective action to curtail or eliminate the source(s) of tritium; implement the program of corrective action; and evaluate subsequent monitoring data to ensure that correction has been achieved. (JGB)

  1. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  2. Student Assistance Program Demonstration Project Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Pollard, John A.; Houle, Denise M.

    This document presents the final report on the evaluation of California's model student assistance program (SAP) demonstration projects implemented in five locations across the state from July 1989 through June 1992. The report provides an overall, integrated review of the evaluation of the SAP demonstration projects, summarizes important findings…

  3. Assessment and Improvement of Related Services (AIRS) Project. Final Report.

    ERIC Educational Resources Information Center

    McClelland, Robert A.; Hirata, Glenn T.

    The document presents the final report of the Assessment and Improvement of Related Services (AIRS) Project, an effort to assess the impact and effectiveness of special education related services in Hawaii. Each of the four project objectives focused on accomplishment of one of the evaluation types specified in the Context-Input-Process-Product…

  4. Multi-County Assessment of Adult Needs Project: Final Report.

    ERIC Educational Resources Information Center

    McLennan Community Coll., TX.

    The document is a summarized final report of the Multi-County Assessment of Adult Needs Project (MAP) which took place in central Texas (Bosque, Falls, Hill, and McLennan Counties). It summarizes the major activities and accomplishments of the project and contains all materials except Attachments 1 and 2, the reports on Phase I (Survey of Adult…

  5. Latin American Literacy Partnership Project. Final Formative Evaluation.

    ERIC Educational Resources Information Center

    Watt, David L. E.

    This final evaluation of the 1991-92 program year of the Latin American literacy Project, designed to foster English language literacy in Spanish-speaking families in Canada, is intended as a formative report, American Literacy Project is intended as a formative report, assessing the changes in the students' language proficiency and the progress…

  6. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  7. Wastewater Triad Project: Final Summary Report

    SciTech Connect

    Walker, J.F.

    2001-12-27

    the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), and Land Disposal Restrictions (LDR) regulations; and (5) deploy state-of-the art technologies that have applications across the DOE complex. Partnerships were developed with DOE technology development agencies, private-sector companies, and other DOE sites to accomplish implementation of these technologies.

  8. Project GROW. Final Project Report, January 1989 to June 30, 1989.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    This document contains a final project report and curriculum modules from Project GROW, which measured the impact of training on the self-esteem and career awareness of homeless and single parents/displaced homemakers before and after program completion. Project GROW resulted from Project WORTH (Work Opportunity Readiness for the Homeless). The…

  9. The Choptank Watershed Wetland Conservation Effects Assessment Project: Monitoring the Effect of Wetland Conservation Practices on Water Quality

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Choptank Watershed Wetland Conservation Effects Assessment Project (CEAP) brings together an interdisciplinary group of experts and resources from multiple federal agencies and the University of Maryland to assess the ability of native, restored, and prior-converted wetlands on cropland to impro...

  10. HIP densification project. Final CRADA report

    SciTech Connect

    Franco-Ferreira, E.A.; Finkelstein, W.

    1997-08-29

    An investigation was conducted to evaluate the use of HIPed aluminum castings as near-net-shape blanks for large electrostatic focusing electrodes in ion lithography machines. The electrodes must have very smooth finishes which are free of pores and other defects. This has heretofore been achieved by rough-machining the blanks out of large forged aluminum billets and final diamond-turning. The use of a near-net-shape casting for the blank was expected to save a significant amount of money and time. The test was conducted on a single cast blank which was supplied by the Partner in the HIPed and stress relieved condition. Rough machining and diamond turning operations conducted by LMES/ER revealed that the casting contained unacceptably large defects. The conclusion was reached that HIPed aluminum castings in the large sizes and of the quality levels required would probably be unobtainable in a cost-effective manner. An alternative approach, using ring forgings assembled by electron beam welding was proposed and investigated by LMES/ER. Although an electrode blank was not obtained, the study indicated that this approach would be successful and cost-effective.

  11. Ice Load Project Final Technical Report

    SciTech Connect

    McCoy, Timothy J.; Brown, Thomas; Byrne, Alex

    2014-10-30

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of an integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the moving ice

  12. WSF Biodiesel Demonstration Project Final Report

    SciTech Connect

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research and analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and

  13. Baltimore Zoo digester project. Final report. [Elephants

    SciTech Connect

    Gibson, P.W.

    1980-01-01

    The results of a project to produce methane using the manure from zoo animals as a feedstock is presented. Two digesters are in operation, the first (built in 1974) utilizing wastes from the Hippo House and a second (built in 1980) utilizing wastes from the Elephant House. Demonstrations on the utilization of the gas were performed during zoo exhibits. The Elephant House Digester has a capacity of 4200 gallons and a floating gas dome which can retain at least 150 cu ft of gas. Solar energy has been incorporated into the design to maintain digester temperature at 95/sup 0/F. The system produces 50 cu ft per day. After cleaning the gas, it is used to generate electricity to power an electric light, a roof fan, and an air conditioner. The gas is also used to operate a gas range and a gas lamp. During the opening day exhibit, 50 meals were cooked using the bio-gas from just 2 elephants. (DMC)

  14. SMAP Verification and Validation Project - Final Report

    NASA Technical Reports Server (NTRS)

    Murry, Michael

    2012-01-01

    In 2007, the National Research Council (NRC) released the Decadal Survey of Earth science. In the future decade, the survey identified 15 new space missions of significant scientific and application value for the National Aeronautics and Space Administration (NASA) to undertake. One of these missions was the Soil Moisture Active Passive (SMAP) mission that NASA assigned to the Jet Propulsion Laboratory (JPL) in 2008. The goal of SMAP1 is to provide global, high resolution mapping of soil moisture and its freeze/thaw states. The SMAP project recently passed its Critical Design Review and is proceeding with its fabrication and testing phase.Verification and Validation (V&V) is widely recognized as a critical component in system engineering and is vital to the success of any space mission. V&V is a process that is used to check that a system meets its design requirements and specifications in order to fulfill its intended purpose. Verification often refers to the question "Have we built the system right?" whereas Validation asks "Have we built the right system?" Currently the SMAP V&V team is verifying design requirements through inspection, demonstration, analysis, or testing. An example of the SMAP V&V process is the verification of the antenna pointing accuracy with mathematical models since it is not possible to provide the appropriate micro-gravity environment for testing the antenna on Earth before launch.

  15. Helical Screw Expander Evaluation Project. Final report

    SciTech Connect

    McKay, R.

    1982-03-01

    A functional 1-MW geothermal electric power plant that featured a helical screw expander was produced and then tested in Utah in 1978 to 1979 with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing operation on two-phase geothermal fluids. The Project also produced a computer-equipped data system, an instrumentation and control van, and a 1000-kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Additional testing was performed in Mexico in 1980 under a cooperative test program using the same test array, and machine efficiency was measured at 62% maximum with the rotors partially coated with scale, compared with approximately 54% maximum in Utah with uncoated rotors, confirming the importance of scale deposits within the machine on performance. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.

  16. Aerogel commercialization pilot project. Final program report

    SciTech Connect

    1996-02-13

    Aerogels are extremely light weight, high surface area, very insulative materials that offer many potential improvements to commercial products. Aerogels have been the subject of extensive research at Department of Energy Laboratories and have been considered one of the technology most ready for commercialization. However, commercialization of the technology had been difficult for the National Laboratories since end users were not interested in the high temperature and high pressure chemical processes involved in manufacturing the raw material. Whereas, Aerojet as a supplier of rocket fuels, specialty chemicals and materials had the manufacturing facilities and experience to commercially produce aerogel-type products. Hence the TRP provided a link between the technology source (National Laboratories), the manufacturing (Aerojet) and the potential end users (other TRP partners). The program successfully produced approximately 500 ft{sup 2} of organic aerogel but failed to make significant quantities of silica aerogel. It is significant that this production represents both the largest volume and biggest pieces of organic aerogel ever produced. Aerogels, available from this program, when tested in several prototype commercial products were expected to improve the products performance, but higher than expected projected production costs for large scale manufacture of aerogels has limited continued commercial interest from these partners. Aerogels do, however, offer potential as a specialty material for some high value technology and defense products.

  17. Innovative subsurface stabilization project -- Final Report

    SciTech Connect

    Loomis, G.G.; Zdinak, A.P.; Bishop, C.W.

    1996-11-01

    This is a report of results of applying four innovative grouting materials and one commercially available material for creating monoliths out of buried waste sites using jet grouting. The four innovative materials included a proprietary water-based epoxy, an Idaho National Engineering Laboratory-developed two-component grout that resembles hematite when cured with soil, molten low-temperature paraffin, and a proprietary iron oxide cement-based grout called TECT. The commercial grout was Type-H high-sulfate-resistant cement. These materials were tested in specially designed cold test pits that simulate buried transuranic waste at the Idaho National Engineering Laboratory. In addition to the grouting studies, specially designed field-scale permeameters were constructed to perform full-scale controlled mass balance hydraulic conductivity studies. An ungrouted field-scale permeameter contained simulated buried waste and soil and was left ungrouted, and a second identical field-scale permeameter was grouted with commercial-grade Type-H cement. The field demonstrations were performed in an area referred to as the Cold Test Pit at the Idaho National Engineering Laboratory. The Cold Test Pit is adjacent to the laboratory`s Radioactive Waste Management Complex. At the complex, 2 million ft{sup 3} of transuranic waste is commingled with 6--8 million ft{sup 3} of soil in shallow land burial, and improving the confinement of this waste is one of the options for final waste disposition. This report gives results of grouting, coring, hydraulic conductivity, and destructive examination of the grouted buried waste matrix.

  18. Impact of the agricultural research service watershed assessment studies on the conservation effects assessment project cropland national assessment

    Technology Transfer Automated Retrieval System (TEKTRAN)

    USDA initiated the Conservation Effects Assessment Project (CEAP) in 2002 to analyze societal and environmental benefits gained from the increased conservation program funding provided in the 2002 Farm Bill. The Natural Resources Conservation Service (NRCS), Agricultural Research Service (ARS), and...

  19. Final Technical Report. Project Boeing SGS

    SciTech Connect

    Bell, Thomas E.

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  20. Final Report on Atomic Database Project

    SciTech Connect

    Yuan, J., Gui, Z., and Moses, G.A.

    2006-07-18

    Atomic physics in hot dense plasmas is essential for understanding the radiative properties of plasmas either produced terrestrially such as in fusion energy research or in space such as the study of the core of the sun. Various kinds of atomic data are needed for spectrum analysis or for radiation hydrodynamics simulations. There are many atomic databases accessible publicly through the web, such as CHIANTI (an atomic database for spectroscopic diagnostics for astrophysical plasmas) from Naval Research Laboratory [1], collaborative development of TOPbase (The Opacity Project for astrophysically abundant elements) [2], NIST atomic spectra database from NIST [3], TOPS Opacities from Los Alamos National Laboratory [4], etc. Most of these databases are specific to astrophysics, which provide energy levels, oscillator strength f and photoionization cross sections for astrophysical elements ( Z=1-26). There are abundant spectrum data sources for spectral analysis of low Z elements. For opacities used for radiation transport, TOPS Opacities from LANL is the most valuable source. The database provides mixed opacities from element for H (Z=1) to Zn (Z=30) The data in TOPS Opacities is calculated by the code LEDCOP. In the Fusion Technology Institute, we also have developed several different models to calculate atomic data and opacities, such as the detailed term accounting model (DTA) and the unresolved transition array (UTA) model. We use the DTA model for low-Z materials since an enormous number of transitions need to be computed for medium or high-Z materials. For medium and high Z materials, we use the UTA model which simulates the enormous number of transitions by using a single line profile to represent a collection of transition arrays. These models have been implemented in our computing code JATBASE and RSSUTA. For plasma populations, two models are used in JATBASE, one is the local thermodynamic equilibrium (LTE) model and the second is the non-LTE model. For the

  1. Petascale Computing Enabling Technologies Project Final Report

    SciTech Connect

    de Supinski, B R

    2010-02-14

    The Petascale Computing Enabling Technologies (PCET) project addressed challenges arising from current trends in computer architecture that will lead to large-scale systems with many more nodes, each of which uses multicore chips. These factors will soon lead to systems that have over one million processors. Also, the use of multicore chips will lead to less memory and less memory bandwidth per core. We need fundamentally new algorithmic approaches to cope with these memory constraints and the huge number of processors. Further, correct, efficient code development is difficult even with the number of processors in current systems; more processors will only make it harder. The goal of PCET was to overcome these challenges by developing the computer science and mathematical underpinnings needed to realize the full potential of our future large-scale systems. Our research results will significantly increase the scientific output obtained from LLNL large-scale computing resources by improving application scientist productivity and system utilization. Our successes include scalable mathematical algorithms that adapt to these emerging architecture trends and through code correctness and performance methodologies that automate critical aspects of application development as well as the foundations for application-level fault tolerance techniques. PCET's scope encompassed several research thrusts in computer science and mathematics: code correctness and performance methodologies, scalable mathematics algorithms appropriate for multicore systems, and application-level fault tolerance techniques. Due to funding limitations, we focused primarily on the first three thrusts although our work also lays the foundation for the needed advances in fault tolerance. In the area of scalable mathematics algorithms, our preliminary work established that OpenMP performance of the AMG linear solver benchmark and important individual kernels on Atlas did not match the predictions of our

  2. Tritium research laboratory cleanup and transition project final report

    SciTech Connect

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  3. Self-Correcting HVAC Controls Project Final Report

    SciTech Connect

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

    2010-01-04

    This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

  4. Augustine Band of Cahuilla Indians Energy Conservation and Options Analysis - Final Report

    SciTech Connect

    Paul Turner

    2008-07-11

    The Augustine Band of Cahuilla Indians was awarded a grant through the Department of Energy First Steps program in June of 2006. The primary purpose of the grant was to enable the Tribe to develop energy conservation policies and a strategy for alternative energy resource development. All of the work contemplated by the grant agreement has been completed and the Tribe has begun implementing the resource development strategy through the construction of a 1.0 MW grid-connected photovoltaic system designed to offset a portion of the energy demand generated by current and projected land uses on the Tribe’s Reservation. Implementation of proposed energy conservation policies will proceed more deliberately as the Tribe acquires economic development experience sufficient to evaluate more systematically the interrelationships between conservation and its economic development goals.

  5. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  6. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  7. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  8. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  9. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  10. Legacy sample disposition project. Volume 2: Final report

    SciTech Connect

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmental and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions.