Science.gov

Sample records for conservation project final

  1. The Hood River Story : Marketing a Conservation Project : Final Report.

    SciTech Connect

    Kaplon, Shellie

    1987-09-01

    This report presents the marketing efforts behind the Hood River Conservation Project (the Project). The Project was a research effort designed to identify and systematically document the effects and retrofit potential of conservation when rapidly implemented within a limited geographic area. Super-weatherization measures were installed in 85 percent of all qualified households at virtually no cost to the homeowner. The goals of the project were to determine the maximum penetration rate of weatherization participation and measures within a limited period of time; the relative effectiveness of various approaches to conservation marketing; the characteristics of community social interaction and impacts under maximum conservation conditions; the costs associated with the development and conduct of a maximum conservation effort; and the effects of conservation on distribution and transmission systems, load management, and savings. The purpose of this volume is to present the marketing efforts of the Project (drawing from the community assessment, marketing plan, and promotional plan) and their impact in achieving program goals (defined as participation, measures penetration, and pre- and posttest survey results). 20 refs, 8 figs., 10 tabs.

  2. Energy conservation in citrus processing. Final project report

    SciTech Connect

    Leo, M.A.; Lari, R.I.; Moore, N.R.; Broussard, M.R.; Gyamfi, M.

    1981-11-01

    Alternative energy conserving systems for use in citrus processing plants were synthesized and evaluated in terms of energy savings and economic return. The energy intensive operations that are carried out in citrus processing plants include conveying and extraction, concentration, peel drying, refrigeration, and pasteurization. The alternative energy conserving systems are synthesized from components and subsystems that are arranged to make use of energy cascading and thermodynamic regeneration to reduce the overall energy usage. System requirements such as air pollution rules and plant processing load cycles, a characterization of major operations, description of alternative system concepts, and the evaluation of alternative systems in terms of economic parameters and energy usage are identified.

  3. Municipal-building conservation project: financing conservation in municipal buildings. Final report

    SciTech Connect

    Gatton, David; Mounts, Richard; Scrimger, Kay; Wood, Elizabeth; Musselwhite, Ron; Wanning, Helen; Frazier, Andrew; Pyles, Odessa

    1982-01-01

    The purpose of this survey was to assess one dimension of the energy problem that confronts cities - energy costs for public buildings - and to see how a sample of local governments had confronted that problem. While cities of all sizes tend to have a considerable variety of buildings, most are related to the basic municipal service of administration, police and fire protection, public works, and recreation. Most of these buildings consume natural gas and electricity as their primary source of energy, sources whose price is likely to rise more rapidly than the rate of inflation in the next few years. While it is difficult to assess the reports of energy costs without comparing them to the total city budget, these costs were found to be sizable among small and medium cities, and quite large among larger cities. While several of the conservation programs in the sample dated back to 1976, almost half (14) were relatively new, having been undertaken only in the last three years. Administratively, most have been placed under the direction of budget or public works officials, and, substantively, have emphasized no-cost/low-cost measures, such as employee awareness programs and improvements in building maintenance. In keeping with this, most of the programs have been supported by reprogramming funds, supplemented with local capital improvement funds, and state and federal grants. Case studies for five localities are appended.

  4. ASEAN-USAID Buildings Energy Conservation Project. Final report, Volume 3: Audits

    SciTech Connect

    Loewen, J.M.; Levine, M.D.; Busch, J.F.

    1992-06-01

    The auditing subproject of the ASEAN-USAID Buildings Energy Conservation Project has generated a great deal of auditing activity throughout the ASEAN region. Basic building characterisfic and energy consumption data were gathered for over 200 buildings and are presented in this volume. A large number of buildings were given more detailed audits and were modeled with either the ASEAM-2 computer program or the more complex DOE-2 program. These models were used to calculate the savings to be generated by conservabon measures. Specially audits were also conducted, including lighting and thermal comfort surveys. Many researchers in the ASEAN region were trained to perform energy audits in a series of training courses and seminars. The electricity intensifies of various types of ASEAN buildings have been calculated. A comparison to the electricity intensity of the US building stock tentatively concludes that ASEAN office buildings are comparable, first class hotels and retail stores are more ewctricity intensive than their US counterparts, and hospitals are less intensive. Philippine and Singapore lighting surveys indicate that illuminance levels in offices tend to be below the minimum accepted standard. Computer simulations of the energy use in various building types generally agree that for most ASEAN buildings, electricity consumption for air-conditioning (including fan power) consumes approximately 60% of total building electricity. A review of the many studies made during the Project to calculate the savings from energy conservation opportunities (ECOS) shows a median potential savings of approximately 10%, with some buildings saving as much as 50%. Singapore buildings, apparently as a result of previously implemented efficient energy-use practices, shows a lower potential for savings than the other ASEAN nations. Air-conditioning ECOs hold the greatest potential for savings.

  5. Conservation Science Fair Projects.

    ERIC Educational Resources Information Center

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  6. ASEAN-USAID buildings energy conservation project. Volume 1, Energy standards: Final report

    SciTech Connect

    Levine, M.D.; Busch, J.F.; Deringer, J.J.

    1992-06-01

    Mandatory or voluntary energy-efficiency standards for new or existing buildings can play an important role in a national program aimed at promoting energy conservation. Building codes and standards can provide a degree of control over design and building practices throughout the construction process, and encourage awareness of energy-conscious design. Studies in developed countries indicate that efficiency standards can produce energy reductions on the order of 20 to 40% or more. Within ASEAN, analyses of the savings potential from the proposed standards suggest that if implemented, these standards would produce savings over current new design practice of 19% to 24%. In this volume we provide an overview of the ASEAN-USAID project aimed at promulgating standards for energy efficiency in commercial buildings. The process of developing and implementing energy-efficiency standards for buildings can be subdivided into two key components: policy development; and technical and economic analysis. Each of these involves a number of steps and processes, as outlined in Figure 1-1. This volume describes the technical and economic analyses used to develop the proposed energy efficiency standards for four countries (Malaysia, Thailand, the Philippines, and Indonesia), and to refine an energy standard existing in Singapore since 1979. Though oriented toward the ASEAN region, the analysis methods described here are applicable in a range of settings, provided appropriate modifications are made for local building construction, climatic, economic, and political conditions. Implementation issues are not specifically addressed here; rather this volume is oriented towards the analytical work needed to establish or revise an energy standard for buildings.

  7. ASEAN--USAID Buildings Energy Conservation Project final report. Volume 2, Technology

    SciTech Connect

    Levine, M.D.; Busch, J.F.

    1992-06-01

    This volume reports on research in the area of energy conservation technology applied to commercial buildings in the Association of Southeast Asian Nations (ASEAN) region. Unlike Volume I of this series, this volume is a compilation of original technical papers prepared by different authors in the project. In this regard, this volume is much like a technical journal. The papers that follow report on research conducted by both US and ASEAN researchers. The authors representing Indonesia, Malaysia, Philippines, and Thailand, come from a range of positions in the energy arena, including government energy agencies, electric utilities, and universities. As such, they account for a wide range of perspectives on energy problems and the role that technology can play in solving them. This volume is about using energy more intelligently. In some cases, the effort is towards the use of more advanced technologies, such as low-emittance coatings on window glass, thermal energy storage, or cogeneration. In others, the emphasis is towards reclaiming traditional techniques for rendering energy services, but in new contexts such as lighting office buildings with natural light, or cooling buildings of all types with natural ventilation. Used in its broadest sense, the term ``technology`` encompasses all of the topics addressed in this volume. Along with the more customary associations of technology, such as advanced materials and equipment and the analysis of their performance, this volume treats design concepts and techniques, analysis of ``secondary`` impacts from applying technologies (i.e., unintended impacts, or impacts on parties not directly involved in the purchase and use of the technology), and the collection of primary data used for conducting technical analyses.

  8. Data compilation for Conservation Effects Assessment Project: Yalobusha River Watershed, final report

    Technology Transfer Automated Retrieval System (TEKTRAN)

    There is increasing private and public interest in whether the investment in conservation practice installation has been a worthy use of public funding. As part of the 2002 Farm Bill, the USDA spends around $4 billion annually on the following conservation programs: Environmental Quality Incentive ...

  9. Final Report and Evaluation of Project S.P.R.U.C.E. (Science Project Related to Upgrading Conservation Education).

    ERIC Educational Resources Information Center

    Busch, Phyllis S.

    Presented is an environmental approach to elementary school science teaching. The inquiry approach is stressed and outdoor activities are integrated with classroom activities. A variety of curricular materials were developed to be used in conjunction with the New York State Elementary Science Curriculum. The project also provided workshops for…

  10. Energy-conservation-investment decision making in developing countries: A review of project implementation in industry. Final report

    SciTech Connect

    Not Available

    1989-12-01

    Despite recent efforts in a number of developing countries to promote energy conservation (EC) and efficiency, only a fraction of EC potential has been captured, especially for projects that require significant investments. The document analyzes EC efforts in 11 countries where energy audit and/or feasibility study programs have been carried out (Bangladesh, Costa Rica, Ecuador, El Salvador, Guatemala, Honduras, Jordan, Pakistan, Panama, the Philippines, and Sri Lanka), covering some 1,500 EC projects involving 242 industrial companies. Cost and length of payback seem to be the determining factors for companies considering EC measures; no-cost or low-cost projects with paybacks of less than a year (such as power factor improvement projects) had the highest rate of implementation, while expensive, complicated projects (e.g., cogeneration or fuel substitution projects) were most often rejected. The document concludes, however, that the rate of implementation of EC programs has been quite high, and recommends that inexpensive, short-term projects be featured in future EC programs and increased levels of TA and financial assistance be made available to companies implementing long-term EC measures.

  11. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    SciTech Connect

    Not Available

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  12. Conservation Education Improvement. Final Report.

    ERIC Educational Resources Information Center

    Diem, Kenneth L.; Hennebry, Howard M.

    In an attempt to improve the teaching of conservation in elementary and junior high schools, a set of integrated sequential core units was formulated and tested in five Wyoming school districts during the fall and early winter of 1968. Based on a total sample of 840 elementary students (38% usable response) and 960 junior high students (49% usable…

  13. Project Adobe. Final Report.

    ERIC Educational Resources Information Center

    Van Curen, Sallie A.

    This final report describes activities and accomplishments of Project Adobe, the New Mexico Parent Training and Information Center, which provides information, support, education and training to families with school-aged children with disabilities in their local communities. Achievements include: (1) completion and printing of a booklet on the…

  14. The Finals Examination in Conservative Dentistry.

    ERIC Educational Resources Information Center

    Jeffrey, I. M. W.; Grieve, A. R.

    1987-01-01

    The format of the final examinations in Conservative Dentistry in the Dental Schools of Great Britain and Ireland was investigated by means of a questionnaire sent to each of the dental schools in each country. Results are reported and the value of different parts of the examinations are discussed. (Author/RH)

  15. Communicating Conservation Effects Assessment Project Results

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Conservation Effects Assessment Project (CEAP) is a unique effort to quantify the environmental benefits of conservation practices at watershed scales and nationally. Such a large-scale project cannot be accomplished without the cooperation and communication of a wide range of experts and stakeh...

  16. Subjective risk assessment for planning conservation projects

    NASA Astrophysics Data System (ADS)

    Game, Edward T.; Fitzsimons, James A.; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-12-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner.

  17. Project BEST Final Report.

    ERIC Educational Resources Information Center

    Pankratz, David; Friedenberg, Joan

    Project BEST (Building Energy Systems Technology), a bilingual vocational training program, operated at Oakton Community College between March 1986 and September 1987. The purpose of the project was to provide 60 limited English proficient (LEP) Hispanic and Polish adults with sufficient vocational skills, English language skills, and appropriate…

  18. Project ACHIEVE final report

    SciTech Connect

    1997-06-13

    Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

  19. Project ACORDE. Final Report.

    ERIC Educational Resources Information Center

    Kelley, Marjorie L.

    A report is presented on the evaluation and redevelopment of an 11-module course of instruction in restorative dentistry conducted under Project Acorde. The major learning goals for students were: acquisition of the necessary skills and knowledge of appropriate tools and materials; and self-appraisal of one's own work in performing the various…

  20. Final Year Project Report

    SciTech Connect

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  1. ACCESS Project: Final Report

    SciTech Connect

    Weller, Heiko

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  2. Final Project Report

    SciTech Connect

    Small, R. Justin; Bryan, Frank; Tribbia, Joseph; Park, Sungsu; Dennis, John; Saravanan, R.; Schneider, Niklas; Kwon, Young-Oh

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  3. Geothermal Project. Final report

    SciTech Connect

    Not Available

    1983-03-31

    The project was designed to take 95/sup 0/F water from an existing well and process it through a heat exchanger carrying supply water for our boiler make up and domestic hot water systems. The temperature of this water runs from 55/sup 0/F to 65/sup 0/F. In operation it was possible to raise the temperature of this water an average of approximately 12/sup 0/F. The amount of energy captured was recorded and it was found that one can capture approximately 199 x 10/sup 6/ Btu/Mo. Using current energy costs and a boiler efficiency factor of .8 a potential annual savings of approximately $11,104/year was calculated. The total cost of the project was $31,893.68. Using these figures a simple pay back period of 2.9 years was calculated.

  4. Final Project Report

    SciTech Connect

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  5. Final project report

    SciTech Connect

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  6. Final project report

    SciTech Connect

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  7. The Trine Project Final Report.

    ERIC Educational Resources Information Center

    Gunderson, Jon R.; And Others

    The final report describes the Trine Project which addressed three needs in the education of handicapped children: the need for an alternate writing system, the need for communication, and the need for access to general purpose computers used in the schools. The project had three major objectives: (1) to design a low-cost portable writing and…

  8. Final Project Report

    SciTech Connect

    Zhang, Jin; Zhao, Yiping

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  9. Final Project Report

    SciTech Connect

    Carrick M. Eggleston

    2003-12-12

    This report provides a description of the main accomplishments of the EMSP funded research, including products such as conference presentations and publications (including those still in preparation). The purpose of this study was to better understand the chemical interactions between dissolved aqueous contaminants and carbonate minerals occurring as coatings on mineral grains in the vadose zone beneath the Hanford reserve. This information is important for construction of improved reactive transport models intended to predict the subsurface migration of contaminants. We made improvements to the hydrothermal atomic force microscope (HAFM) design to be used in this project. The original HAFM was built with funding from the U.S. DOE, Office of Basic Energy Sciences. Improvements include operating limits of 70 bars and 170 C, from an original limit of 12 bars and 150 C. This product is patented. We completed a series of studies of magnesite, MgCO3, because this mineral is structurally equivalent to calcite but reacts much more slowly, allowing us to study carbonate reactivity under pH conditions (i.e., low pH) that are much more problematic for studies of calcite but which are nevertheless relevant to in-situ conditions. We found that dissolving magnesite exhibits a dramatic change in step orientation, and therefore etch pit shape, as pH is lowered through 4.2 to 3 and 2. This change in step orientation is NOT accompanied by an increase in step velocity with decreasing pH. We also found that, after growing magnesite on a magnesite substrate, the newly grown magnesite dissolved much more readily than the underlying substrate magnesite, and exhibited far larger etch pit densities. This effect may have been related to the rate of growth or to the presence of an Fe impurity in the growth solutions. We studied the dissolution of magnesite and calcite (104) surfaces under a wider variety of conditions with a new hydrodynamically defined hydro thermal AFM fluid cell, and we

  10. Physicians Training Project. Final Report.

    ERIC Educational Resources Information Center

    Bruder, Mary Beth

    This final report describes the accomplishments and activities of a project which developed, implemented, and evaluated training activities for medical students, pediatric residents, and practicing physicians to enhance their understanding of and involvement with early intervention and the special education system in Connecticut. The training…

  11. Multihandicapped Blind. Final Project Report.

    ERIC Educational Resources Information Center

    Jones, Lloyd

    The final report of the Garden Grove unified school district project for 1969 through 1972 (funded through Title III) involving six multiply handicapped, legally blind children, 7- to 10-years-old, who were previously excluded from special education (SE) classes is presented. Described as the main procedural objective is development of a…

  12. Community Participation in Jamaican Conservation Projects.

    ERIC Educational Resources Information Center

    Lundy, Patricia

    1999-01-01

    In Jamaica, people most likely to be affected by environmental degradation are less likely to be involved in environmental nongovernmental organizations and community-based conservation projects. Funders, practitioners, and policy makers should work to remove barriers to participation and ensure equitable allocation of funding. (SK)

  13. Energy Conservation Research Study. Final Report.

    ERIC Educational Resources Information Center

    Cayemberg, Merlin; And Others

    This study explored the availability of energy conservation programs at community colleges; the apparent need for such programs or courses by industry, business, and government; and the types of programs, if any, which should be offered at the vocational/technical level. Information was sought from 52 current two-year programs, the fifty state…

  14. City of Corvallis Rental Housing Energy Conservation: Final report

    SciTech Connect

    Christensen, J.J.

    1986-06-01

    This report provides a summary of the results of the Corvallis Rental Housing Energy Conservation Project. In addition to the report summary of the BPA project marketing and educational activities, Appendices A, B and C contain background material regarding the Corvallis weatherization financing program. For individuals reviewing the project results, these appendices are recommended reading for understanding Corvallis innovative approach to promoting rental housing energy conservation.

  15. Design Alternatives for Evaluating the Impact of Conservation Projects

    ERIC Educational Resources Information Center

    Margoluis, Richard; Stem, Caroline; Salafsky, Nick; Brown, Marcia

    2009-01-01

    Historically, examples of project evaluation in conservation were rare. In recent years, however, conservation professionals have begun to recognize the importance of evaluation both for accountability and for improving project interventions. Even with this growing interest in evaluation, the conservation community has paid little attention to…

  16. Financial Energy Conservation Projects at Independent Colleges and Universities.

    ERIC Educational Resources Information Center

    Morrell, L. R.

    1981-01-01

    Factors affecting financial decisions for energy conservation projects at independent colleges and universities and methods that may be used when making a financial investment decision are examined, along with sources of funding for the projects. Projects that result in the conservation of energy resources might, in a time of extreme shortages,…

  17. Project WORKSMART. A Final Report.

    ERIC Educational Resources Information Center

    NashvilleREAD, Nashville, TN.

    Project WORKSMART was a Nashville, Tennessee-based workplace literacy project to provide an exemplary multidimensional workplace literacy program while simultaneously demonstrating products and practices that promote lifelong learning that can be customized and replicated in diverse work environments. The project was a partnership between…

  18. Curriculum for Energy Use and Conservation Technicians. Final Report.

    ERIC Educational Resources Information Center

    Hull Daniel M.

    A project designed a national curriculum model for Energy Conservation-and-Use Technicians (ECUTs) and developed and tested instructional materials for use in the courses. The two-year postsecondary ECUT curriculum was designed to provide an interdisciplinary technical base (electrical, mechanical, thermal, and fluidal principles) and technical…

  19. Readings in Wildlife and Fish Conservation, High School Conservation Curriculum Project.

    ERIC Educational Resources Information Center

    Ensminger, Jack

    This publication is a tentative edition of readings on Wildlife and Fish Conservation in Louisiana, and as such it forms part of one of the four units of study designed for an experimental high school course, the "High School Conservation Curriculum Project." The other three units are concerned with Forest Conervation, Soil and Water Conservation,…

  20. 78 FR 43912 - Final Candidate Conservation Agreement with Assurances, Final Environmental Assessment, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ...We, the U.S. Fish and Wildlife Service (Service), make available the final Candidate Conservation Agreement with Assurances (CCAA) for the Rio Grande cutthroat trout (Oncorhynchus clarki virginialis) in New Mexico and Colorado, as well as the final environmental assessment (EA) and the draft Finding of No Significant Impact (FONSI) under the National Environmental Policy Act of 1969 (NEPA).......

  1. Educational Information Project. Final Report.

    ERIC Educational Resources Information Center

    Foley, Walter J.

    The CardPac System of Educational Accounting project developed instruments and procedures for collecting information about aspects of the elementary and secondary educational programs in Iowa. This project included the development of a bank of educational information that will transcribe, integrate, and store information centrally for purposes of…

  2. Comprehensive Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    1969

    This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…

  3. Project TIME. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Schroyer, Connie J.; Payne, David L.

    Project TIME (Training Initiative for Manufacturing Employees) was an 18-month National Workplace Literacy Program conducted by Lord Fairfax Community College in conjunction with an automotive parts plant and Triplett Technical and Business Institute in Virginia. Project TIME had three primary objectives: to help employees obtain the basic…

  4. Landfill gas project. Final report

    SciTech Connect

    1983-01-01

    The methane gas recovered from the landfill is used for space heating and water heating for the Florence-Lauderdale Humane Shelter 600 feet from the well head. The project to date and future development are described briefly. (MHR)

  5. Insulated siding project: Final report

    SciTech Connect

    Not Available

    1986-12-01

    Research and development on the nibbed vinyl insulative siding product has been completed. The product has been tested and evaluated in response to the issues raised by the first and second stage reviewers in the OERI invention review process. The production run machine design has been completed, prototyped and evaluated and the agreement for full-scale production. Final evaluation and testing of the machine's flawless part production was integral to the manufacture and preparation of samples for purposes of final tests in the Ball State CERES laboratories.

  6. Green Schools Project Final Report

    SciTech Connect

    Verdict, M.

    2000-09-27

    The Alliance to Save Energy has responded to interest in the Green Schools concept from the New England states of Maine, New Hampshire and Vermont. The Alliance conducted a train-the-trainers workshop in Augusta, Maine March 17--18, 1999. This work is part of a Green Schools replication project leveraged by funds from another source, NORDAX, which contributed $80,000 to provide partial support to staff at the Maine Energy Education Project (MEEP), Vermont Energy Education Program (VEEP), and New Hampshire Governor's Office to develop Green Schools Projects. DOE funds were used to conduct training, develop a network of state and local government, business and school partners to support school efficiency activities in those three states.

  7. The Compact Project: Final Report.

    ERIC Educational Resources Information Center

    National Alliance of Business, Inc., Washington, DC.

    The National Alliance of Business (NAB) surveyed the 12 sites that participated in the Compact Project to develop and implement programs of business-education collaboration. NAB studied start-up activities, key players, conditions for collaboration, accomplishments, challenges, and future plans. Program outcomes indicated that building successful…

  8. Montana Faxnet Project. Final Report.

    ERIC Educational Resources Information Center

    Brander, Linda L.

    This report summarizes the activities and accomplishments of the Montana Faxnet Project, which was created to design and demonstrate a statewide document delivery network utilizing telefacsimile equipment that would create equitable access for all Montanans accessing and retrieving information, and reduce the waiting time for requested materials…

  9. Project Open Door. Final Report.

    ERIC Educational Resources Information Center

    Verheyden-Hilliard, Mary Ellen

    The major purpose of Project Open Door was to design, develop, test, and disseminate a portable module for vocational educators and others to use with junior high school students in pre-vocational exploration free of sex stereotyping. The module produced contained a slide presentation with accompanying cassette tape and a leader's guide. An…

  10. Collection Analysis Project. Final Report.

    ERIC Educational Resources Information Center

    Dole, Wanda; And Others

    The Collection Analysis Project (CAP) was undertaken in response to one of the major recommendations of the University at Stony Brook Libraries' strategic plan. It is the first step in promoting the necessary change to bring collection management and development into conformity with accepted professional practice, and make it more responsive to…

  11. Project HEED. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    During 1972-73, Project HEED (Heed Ethnic Educational Depolarization) involved 1,350 Indian students in 60 classrooms at Sells, Topowa, San Carlos, Rice, Many Farms, Hotevilla, Peach Springs, and Sacaton. Primary objectives were: (1) improvement in reading skills, (2) development of cultural awareness, and (3) providing for the Special Education…

  12. Anthropometric Training Project. Final Report.

    ERIC Educational Resources Information Center

    San Diego State Coll., CA.

    The Anthropometric Training Project was aimed at providing a training program for select students to develop research competency in an area relating body type, composition, anthropometric assessment, and physical performance measures. The program involves interdisciplinary cooperation in training through seminars, laboratory practice, and…

  13. Computer Conferencing Project. Final Report.

    ERIC Educational Resources Information Center

    McNeil, Donald R.; And Others

    This report of a 3-year project discusses the results of the testing of computer conferencing and e-mail (electronic mail) at Montgomery College (Maryland) over a period of four semesters. The product was designed to answer the following questions: (1) Could computer conferencing or e-mail increase access? (2) Would the quality of the instruction…

  14. Spray casting project final report

    SciTech Connect

    Churnetski, S.R.; Thompson, J.E.

    1996-08-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step.

  15. Pataha Creek Model Watershed : 1998 Habitat Conservation Projects.

    SciTech Connect

    Bartels, Duane G.

    1999-12-01

    The projects outlined in detail on the attached project reports are a few of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. 1998 was a year where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek.

  16. California Prison Gang Project. Final Report.

    ERIC Educational Resources Information Center

    Cummins, Eric

    A project investigated the cultural life, ideology, and education systems of particular prison gangs. It focused on recent changes in the gang system regarding gang education, organizational structure, and the balance of power in prisons and in relations with street gangs. Finally, the project assessed California's response to its prison gangs, in…

  17. Model Tech Prep Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Southern Maryland Educational Consortium, La Plata.

    The Southern Maryland Educational Consortium's Tech Prep Model Demonstration project is described in this final report. The consortium members are Calvert, Charles, and St. Mary's county school districts and Charles County Community College in southern Maryland. The project is based on a 4 + 2 model in which ninth-grade students develop career…

  18. ECP (Environmental Conservation Project) Report, No. 5, March 1976. Planning for Energy Conservation.

    ERIC Educational Resources Information Center

    Environmental Law Inst., Washington, DC.

    The culmination of the Environmental Law Institute's Energy Conservation Project will be a series of handbooks addressed to state and local officials, legislators, and interested citizens setting out suggested strategies for conserving energy. This issue of the ECP Report publishes the first of a series of draft chapters from these handbooks - a…

  19. Lagoon Restoration Project: Final report

    SciTech Connect

    1995-03-01

    This project is a multiyear effort focusing on energy flow in the Palace of Fine Arts lagoon just outside the Exploratorium in San Francisco. Phase 1 was a pilot study to determine the feasibility of improving biological energy flow through the small freshwater lagoon, using the expertise and resources of an environmental artist in collaboration with museum biologists and arts department staff. The primary outcome of Phase 1 is an experimental fountain exhibit inside the museum designed by public artist Laurie Lundquist with Exploratorium staff. This fountain, with signage, functions both as a model for natural aeration and filtration systems and as a focal point for museum visitors to learn about how biological processes cycle energy through aquatic systems. As part of the study of the lagoon`s health, volunteers continued biweekly bird consus from March through September, 1994. The goal was to find out whether the poor water quality of the lagoon is affecting the birds. Limited dredging was undertaken by the city Parks and Recreation Department. However, a more peermanent solution to the lagoon`s ecological problems would require an ambitious redesign of the lagoon.

  20. Conservation Project Shows Substantial Reduction in Home Water Use

    ERIC Educational Resources Information Center

    Sharpe, William E.; Smith, Donald

    1978-01-01

    Describes a water use study-conservation project conducted by the Washington Suburban Sanitary Commission in Maryland. Results show a significant decrease in the amount of water used by home customers over a ten-year period. (Author/MA)

  1. Conservation Planning with Uncertain Climate Change Projections

    PubMed Central

    Moilanen, Atte; Araújo, Miguel B.

    2013-01-01

    Climate change is affecting biodiversity worldwide, but conservation responses are constrained by considerable uncertainty regarding the magnitude, rate and ecological consequences of expected climate change. Here we propose a framework to account for several sources of uncertainty in conservation prioritization. Within this framework we account for uncertainties arising from (i) species distributions that shift following climate change, (ii) basic connectivity requirements of species, (iii) alternative climate change scenarios and their impacts, (iv) in the modelling of species distributions, and (v) different levels of confidence about present and future. When future impacts of climate change are uncertain, robustness of decision-making can be improved by quantifying the risks and trade-offs associated with climate scenarios. Sensible prioritization that accounts simultaneously for the present and potential future distributions of species is achievable without overly jeopardising present-day conservation values. Doing so requires systematic treatment of uncertainties and testing of the sensitivity of results to assumptions about climate. We illustrate the proposed framework by identifying priority areas for amphibians and reptiles in Europe. PMID:23405068

  2. Multi-faceted energy-conservation program. Final technical report

    SciTech Connect

    Not Available

    1981-01-01

    The purpose of this project was to design and build 19 solar thermosiphoning air panels, insulate walls, generally tighten up the library building, and install other energy conserving devices. Another purpose of the project was to serve as a model to other libraries in Kentucky, to commercial buildings in this area, and to homeowners in the area. After much discussion with architects and among ourselves, we chose a type of solar installation that would be visible to the public and easily replicated. We also carried out a number of procedures to make the library building more energy efficient: installed a 7-day programmable setback thermostat; insulated the walls; improved weatherstripping around the doors; added an economizer control to our air-handling system; and put an electric damper controlling supply air to a large but intermittently usedmeeting room. These changes resulted in approximately $700 in savings from December 1981, through February 1982. Thus far, we have carried out public education with a sign, brochures, press releases, and the purchase of appropriate books; librarians have received our brochure, and some have attended a workshop given here on energy conservation and solar energy.

  3. Typology of public outreach for biodiversity conservation projects in Spain.

    PubMed

    Jiménez, Amanda; Iniesta-Arandia, Irene; Muñoz-Santos, Maria; Martín-López, Berta; Jacobson, Susan K; Benayas, Javier

    2014-06-01

    Conservation education and outreach programs are a key approach to promote public understanding of the importance of biodiversity conservation. We reviewed 85 biodiversity conservation projects supported by the Spanish Ministry of Environment's Biodiversity Foundation. Through content analysis and descriptive statistics, we examined how the projects carried out communication, education, and public awareness and participation (CEPA) actions. We also used multivariate statistical analysis to develop a typology of 4 classes of biodiversity conservation projects on the basis of CEPA implementation. The classifications were delineated by purpose of CEPA, level of integration of CEPA actions, type of CEPA goals, main CEPA stakeholders, and aim of conservation. Our results confirm the existence of 2 key positions: CEPA has intrinsic value (i.e., they supposed the implementation of any CEPA action indirectly supported conservation) and CEPA is an instrument for achieving conservation goals. We also found that most CEPA actions addressed general audiences and school children, ignored minority groups and women, and did not include evaluation. The characteristics of the 4 types of projects and their frequency of implementation in the sample reflect the need for better integration of different types of actions (communication, education, and participation) and improved fostering of participation of multiple stakeholders in developing policy and implementing management strategies. PMID:24400698

  4. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  5. Project "Flashlight" Planning Grant. Final Report.

    ERIC Educational Resources Information Center

    Ehrmann, Stephen C.

    This final report describes results of a planning grant for the "Flashlight" project, an effort to develop, test, and disseminate evaluation procedures that a postsecondary institution or department could use to periodically assess its evolving educational strategies, in particular strategies supported by use of computing, video, and…

  6. Pregnant Adolescent Substance Abuse Project. Final Report.

    ERIC Educational Resources Information Center

    McKnight, A. James

    This document is the final report on the Pregnant Adolescent Substance Abuse Project (PASAP) conducted in Prince Georges County (Maryland) in 1987 and 1988. The PASAP consisted of two components that operated independently: an Early Intervention Program that increased the proportion of pregnant adolescent substance users who were using various…

  7. A Study of Number Conservation With Tasks Which Vary in Length, Area and Volume. Final Report.

    ERIC Educational Resources Information Center

    Taranto, Maria; Mermelstein, Egon

    The objective of this study was an attempt to clarify the nature of number conservation with number conservation tasks using variations in length, area, and volume. According to Piagetian theory, conservation is attained successively for number, length, area, and, finally, volume. It was hypothesized that success on the number conservation tasks…

  8. 76 FR 793 - Multistate Conservation Grant Program; Priority List for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... the FY 2011 priority list of wildlife and sport fish conservation projects from the Association of Fish and Wildlife Agencies (AFWA). As required by the Wildlife and Sport Fish Restoration Programs....gov (e-mail). SUPPLEMENTARY INFORMATION: The Wildlife and Sport Fish Restoration Programs...

  9. 78 FR 25093 - Multistate Conservation Grant Program; Priority List and Approval for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... Conservation Grant Program FY 2013 Projects Total 2013 ID Title Submitter PR funding \\1\\ DJ funding \\2\\ grant........... Understanding Greater Sage- WAFWA 315,042 0 315,042 grouse Response to Wind Energy Development at a Landscape... Restoration funds. \\2\\ DJ Funding: Dingell-Johnson Sport Fish Restoration funds. ASA: American Sport...

  10. Training Manual for the Energy Conservation Analysis Project.

    ERIC Educational Resources Information Center

    Massachusetts Univ., Amherst. Cooperative Extension Service.

    This document is the Massachusetts Energy Extension Service training manual for Residential Energy Auditors. This manual is part of a four-week program to train persons to perform home energy audits and was developed under the Energy Conservation Analysis Project (ECAP) at the University of Massachusetts. The chapter titles include: (1) Project…

  11. Fine sediment sources in conservation effects assessment project watersheds

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Two naturally occurring radionuclides, 7Be and 210Pbxs , were used as tracers to discriminate eroded surface soils from channel-derived sediments in the fine suspended sediment loads of eight Conservation Effects Assessment Project (CEAP) benchmark watersheds. Precipitation, source soils, and suspe...

  12. Overview of the Choptank River watershed conservation effectiveness assessment project.

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Choptank River is a benchmark watershed in the Conservation Effectiveness Assessment Project. It is an estuary and tributary of the Chesapeake Bay. Land use in the watershed (2057 square km) is classified as 52% agriculture, 26% forested, and 5% developed. Agricultural production is centered ...

  13. Prototypical Consolidation Demonstration Project: Final report

    SciTech Connect

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy`s Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG&G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG&G Idaho`s assessments of the equipment and procedures developed by NUS.

  14. 12 CFR 627.2790 - Final discharge and release of the conservator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Final discharge and release of the conservator. 627.2790 Section 627.2790 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM TITLE IV CONSERVATORS, RECEIVERS, AND VOLUNTARY LIQUIDATIONS Conservators and Conservatorships § 627.2790...

  15. User manual for the Hanford Energy Conservation Project data base

    SciTech Connect

    Humphreys, K.K.; Fassbender, L.L.; Weakley, S.A.

    1987-09-01

    The Hanford Energy Conservation (HEC) Project Data Base developed by the Pacific Northwest Laboratory for the US Department of Energy's Richland Operations Office, provides a centralized storehouse of information on planned and ongoing projects which are part of the HEC project. The data base will enable quick analysis of the project portfolio. The data base uses dBase III Plus on an IBM PC. Over 40 data items are stored for each project. A menu-driven applications program was developed as an alternative to using standard dBase III Plus commands. The menu-driven program prompts the user to add data, edit data, perform on-screen searches of the data base, sort the data base by any variable or combination of variables, or generate hard-copy reports of the stored data.

  16. 77 FR 31870 - Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Fish and Wildlife Service Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service) announce that our Final Comprehensive Conservation...

  17. Natural resource dependency and decentralized conservation within Kanchenjunga Conservation Area Project, Nepal.

    PubMed

    Parker, Pete; Thapa, Brijesh

    2012-02-01

    Kanchenjunga Conservation Area Project (KCAP) in Nepal is among the first protected areas in the world to institute a completely decentralized system of conservation and development. Proponents of decentralized conservation claim that it increases management efficiency, enhances the responsiveness to local needs, and promotes greater equity among local residents. This study assessed local equity by evaluating the levels of dependencies on natural resources among households and the factors affecting that dependency. Data were collected via detailed surveys among 205 randomly selected households within the KCAP. Natural resource dependency was evaluated by comparing the ratio of total household income to income derived from access to natural resources. Economic, social, and access-related variables were employed to determine potential significant predictors of dependency. Overall, households were heavily dependent on natural resources for their income, especially households at higher elevations and those with more adult members. The households that received remittances were most able to supplement their income and, therefore, drastically reduced their reliance on the access to natural resources. Socio-economic variables, such as land holdings, education, caste, and ethnicity, failed to predict dependency. Household participation in KCAP-sponsored training programs also failed to affect household dependency; however, fewer than 20% of the households had any form of direct contact with KCAP personnel within the past year. The success of the KCAP as a decentralized conservation program is contingent on project capacity-building via social mobilization, training programs, and participatory inclusion in decision making to help alleviate the dependency on natural resources. PMID:22127405

  18. Natural Resource Dependency and Decentralized Conservation Within Kanchenjunga Conservation Area Project, Nepal

    NASA Astrophysics Data System (ADS)

    Parker, Pete; Thapa, Brijesh

    2012-02-01

    Kanchenjunga Conservation Area Project (KCAP) in Nepal is among the first protected areas in the world to institute a completely decentralized system of conservation and development. Proponents of decentralized conservation claim that it increases management efficiency, enhances the responsiveness to local needs, and promotes greater equity among local residents. This study assessed local equity by evaluating the levels of dependencies on natural resources among households and the factors affecting that dependency. Data were collected via detailed surveys among 205 randomly selected households within the KCAP. Natural resource dependency was evaluated by comparing the ratio of total household income to income derived from access to natural resources. Economic, social, and access-related variables were employed to determine potential significant predictors of dependency. Overall, households were heavily dependent on natural resources for their income, especially households at higher elevations and those with more adult members. The households that received remittances were most able to supplement their income and, therefore, drastically reduced their reliance on the access to natural resources. Socio-economic variables, such as land holdings, education, caste, and ethnicity, failed to predict dependency. Household participation in KCAP-sponsored training programs also failed to affect household dependency; however, fewer than 20% of the households had any form of direct contact with KCAP personnel within the past year. The success of the KCAP as a decentralized conservation program is contingent on project capacity-building via social mobilization, training programs, and participatory inclusion in decision making to help alleviate the dependency on natural resources.

  19. Mapping degradation and conservation in the DESIRE Project

    NASA Astrophysics Data System (ADS)

    van Lynden, G.; Mantel, S.

    2012-04-01

    Mapping degradation and conservation in the DESIRE Project The World Overview of Conservation Approaches and Technologies initiative (WOCAT) started in 1992, in reaction to the Global Assessment of Soil Degradation (GLASOD) by ISRIC. The original idea of WOCAT was to develop a world map similar the GLASOD one, however showing the positive side, i.e. describing what achievements had been made to combat soil degradation. Since 1992 WOCAT has developed and tested a method for standardized documentation and evaluation of Sustainable Land Management (SLM). It comprises three questionnaires, for documenting "Technologies" (what is actually implemented in the field), "Approaches" (what is needed in terms of "enabling environment" for a successful implementation of a technology) and a mapping questionnaire. The resulting database currently counts more than 350 technologies and over 250 approaches from around 50 countries. In the DESIRE project the WOCAT mapping tool was used to map area coverage, degree, impact, effectiveness, and other parameters of land degradation and conservation for 16 study sites. The mapping method in the study sites complements the information provided by the individual case studies on technologies and Approaches. It evaluates what type of land degradation is actually happening where and what is done about it in terms of Sustainable Land Management (SLM). The on-line map database is hosted by WOCAT, and the mapped outputs that can be generated from this database provide a powerful tool to obtain an overview of land degradation and conservation in a country, a region, or worldwide.

  20. Salt river project's participation in Arizona's bald eagle conservation efforts

    NASA Astrophysics Data System (ADS)

    Nobel, Teah A.

    1996-11-01

    Bald eagle ( Haliaeetus leucocephalus) conservation in Arizona, USA, is a prime example of a successful, cooperative environmental management effort. The Salt River Project (SRP) is an active participant in the statewide bald eagle management activities. This paper summarizes the major components of the statewide program and highlights SRP's participation in these efforts. The Southwestern Bald Eagle Management Committee (SWBEMC) was formed as a means of coordinating interagency projects. Chaired by the Arizona Game and Fish Department (AGFD), the SWBEMC is comprised of 15 state, federal, tribal, and private agencies. Together, these agencies sponsor the Nest Watch Program, a unique and effective program dedicated to the study, conservation, and recovery of bald eagles in the southwest. Other significant components of the bald eagle management program include nest monitoring, nest search activities, winter counts, and demography studies.

  1. Effect of risk aversion on prioritizing conservation projects.

    PubMed

    Tulloch, Ayesha I T; Maloney, Richard F; Joseph, Liana N; Bennett, Joseph R; Di Fonzo, Martina M I; Probert, William J M; O'Connor, Shaun M; Densem, Jodie P; Possingham, Hugh P

    2015-04-01

    Conservation outcomes are uncertain. Agencies making decisions about what threat mitigation actions to take to save which species frequently face the dilemma of whether to invest in actions with high probability of success and guaranteed benefits or to choose projects with a greater risk of failure that might provide higher benefits if they succeed. The answer to this dilemma lies in the decision maker's aversion to risk--their unwillingness to accept uncertain outcomes. Little guidance exists on how risk preferences affect conservation investment priorities. Using a prioritization approach based on cost effectiveness, we compared 2 approaches: a conservative probability threshold approach that excludes investment in projects with a risk of management failure greater than a fixed level, and a variance-discounting heuristic used in economics that explicitly accounts for risk tolerance and the probabilities of management success and failure. We applied both approaches to prioritizing projects for 700 of New Zealand's threatened species across 8303 management actions. Both decision makers' risk tolerance and our choice of approach to dealing with risk preferences drove the prioritization solution (i.e., the species selected for management). Use of a probability threshold minimized uncertainty, but more expensive projects were selected than with variance discounting, which maximized expected benefits by selecting the management of species with higher extinction risk and higher conservation value. Explicitly incorporating risk preferences within the decision making process reduced the number of species expected to be safe from extinction because lower risk tolerance resulted in more species being excluded from management, but the approach allowed decision makers to choose a level of acceptable risk that fit with their ability to accommodate failure. We argue for transparency in risk tolerance and recommend that decision makers accept risk in an adaptive management

  2. Northeast Oregon Hatchery Project, Final Siting Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  3. Final Report for the NERI Project

    SciTech Connect

    John C. Lee

    2009-03-31

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report.

  4. Governor's Energy Project, final project report, March 1984

    SciTech Connect

    Not Available

    1984-03-01

    The report documents the early period of the Governors Energy Project, operated under the auspices of the National Governors Association (NGA) from January 1, 1974 through June 30, 1977, and outlines the context within which NHA's energy program began. Further, the general goals, objectives, and tasks of the project are delineated, and the process and product-oriented mechanisms or techniques used by the Project to fulfill its goals, objectives, and tasks are addressed. Finally, the major outcomes and lessons learned with regard to the development, implementation, and maintenance of the intermediary role in the intergovernmental system in addressing nationwide problems, including those with scientific content, are considered. Results reveal that two types of energy information and expertise-sharing took place: State to State, and State to others. Further, the capability of States to develop energy-related policies based in science and technology was enhanced, and State energy offices were strengthened. Federal support is said to be crucial in initiating projects requiring catalytic and coordinative functions.

  5. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  6. Pataha Creek Model Watershed : 1999 Habitat Conservation Projects.

    SciTech Connect

    Bartels, Duane G.

    2000-10-01

    The projects outlined in detail on the attached project reports are a summary of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. Up until last year, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and was the main focus of the implementation phase of the watershed plan. These practices are the main focus of the watershed plan to reduce the majority of the sediment entering the stream. However, the watershed stream evaluation team used in the watershed analysis determined that there were problems along the Pataha Creek that needed to be addressed that would add further protection to the banks and therefore a further reduction of sedimentation into the stream. 1999 was a year where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek. Over 95% of the sediment entering the stream can be tied directly to the upland and riparian areas of the watershed. In stream work was not addressed this year because of the costs associated with these projects and the low impact of the sediment issue concerning Pataha Creeks impact on Chinook Salmon in the Tucannon River.

  7. Energy conserving site design case study: Shenandoah, Georgia. Final report

    SciTech Connect

    Not Available

    1980-01-01

    The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as a passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)

  8. The LiveWire Project final report

    SciTech Connect

    Brown, C.D.; Nelson, T.T.; Kelly, J.C.; Dominguez, H.A.

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  9. NCSU solar energy and conservation house. Final report

    SciTech Connect

    Not Available

    1981-10-01

    A passive solar energy house has been built adjacent to the NCSU McKimmon Continuing Education Center. The house contains a two-story embedded sunspace, two Trombe walls, active solar hot water heating, thermal storage in a rock filled ceiling/floor, and numerous research treatments, and energy conservation features. (See attached photo brochure; Appendix 1). The house is completely decorated and furnished in an attractive manner and the exterior architecture is traditional and has broad consumer appeal. It is also thoroughly instrumented to monitor performance. The house is open to the public on weekends and numerous people come to visit on their own initiative and others take advantage of the close proximity to McKimmon while there attending conferences. The house will influence and motivate large numbers of people to consider solar and energy conservation facets in their homes and will provide data to substantiate performance to prospective home buyers and meaningful data on design and construction for builders.

  10. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ..., 2011, the BLM published a Notice of Intent (NOI) to prepare an EIS in the Federal Register (76 FR 57073... Bureau of Land Management Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement, Riverside County, CA and the Proposed California Desert Conservation Area...

  11. N-STAR/IMAGE Project. Final report

    SciTech Connect

    Driver, R.K.

    1993-06-30

    This is the final report on the N*IMAGE project. It contains a brief abstract of the project background, objectives, efforts taken to achieve the objectives, and publications provided. The Soviet Union has devolved into various autonomous republics, each having individual nationalistic agendas, yet retaining many of the indigenous capabilities and facilities that were present prior to the dissolution of the USSR. Military forces, especially nuclear, still exist in spite of the changes in the overarching control hierarchy. The Commonwealth of Independent States [CIS] has been created, ostensibly maintaining control over the strategic forces of the now-defunct Soviet Union. These changes have created an identifiable need to understand the old forces in a new context. It is important to understand the political, social, and economic structures that bear on the new environment. Information on the individual republics and former Soviet Union is coming in at a staggering rate; it must be assimilated and analyzed while being careful not to lose those existing data points and analysis of Soviet information that are still relevant. The objective of the proposed FSRC work was to provide user-friendly, automated analytical tools to assist the analyst in assessing various aspects of Russia and CIS Nuclear Weapons. For each, the data package includes an extensive, free-form, interactive database system (N-STAR), a hierarchical structure of questions which lead an analyst through the essential elements of the related decisionmaking process (IMAGE), and an instruction manual explaining the use of the systems and their interrelationships. Relevant data su porting the analysis will be available in a standard format on the same system, facilitating data fusion and assessment. These analyst tools are in the form of Macintosh-compatible software systems (N-STAR and IMAGE) along with supporting documentation.

  12. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  13. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  14. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  15. What Can Students Learn from Final Year Research Projects?

    ERIC Educational Resources Information Center

    Ryder, Jim

    2004-01-01

    Final year research projects are a feature of most biosciences undergraduate courses. However, in a climate of increasing student numbers there is growing interest in providing alternatives to such resource-intensive projects. This interest raises some key questions. In particular, what do students learn from traditional final year projects and…

  16. I-SAVE conservation program. Implementing title II of NECPA residential conservation service. Final draft

    SciTech Connect

    1980-05-30

    The I-SAVE (Iowa Saves America's Vital Energy) conservation plan provides comprehensive energy-conservation information and services to residential consumers served by large investor-owned electric and gas utilities and participating home-heating suppliers. The overall objective of the I-SAVE plan is to conserve energy by facilitating cost-effective retrofit of existing housing and promoting more-efficient energy use. The ultimate benefit available to the customer under the I-SAVE plan - reduction in energy use - is dependent upon the action he or she takes as a result of the program audit. Benefits to the utility and the ratepayers as a whole, however, will accrue only upon widespread customer acceptance and utilization of program services. This degree of program acceptance and the resulting benefits to ratepayers can be attained only through an aggressive educational and promotional effort by the covered utilities. All electric and gas utilities which have sales, other than resale, exceeding 750 million kWh of electricity or 10 billion cubic feet of gas and participating home-heating suppliers, shall provide a program announcement and shall offer conservation services to their customers who occupy a residential building containing at least one, but not more than four units, in a manner as provided by the rules. The text of the rules is presented. (MCW)

  17. The Education North Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    Ingram, E. J.; McIntosh, R. G.

    The Education North Evaluation Project monitored operation of the Education North Project (a 1978-82 project aimed at encouraging parents, teachers, and other community members in small, isolated northern Alberta communities to work together in improving the quality of education for school-aged children), assessed project outcomes, and developed…

  18. Final report on implementation of energy conservation practices training in selected public housing developments

    SciTech Connect

    Not Available

    1991-10-01

    This report on the implementation of energy conservation practices training in selected public housing developments represents an initiative of the Research and Education Division, Office of Minority Economic Impact, US Department of Energy. The Office of Minority Economic Impact (MI) was created by Congress in 1979, within the US Department of Energy, to afford the Secretary advice on the effect policies, regulations and other actions of DOE respecting minority participation in energy programs. The Director of MI is responsible for the conduct of ongoing research into the effects, including socio-economic and environmental, of national energy programs, policies, and regulations of the Department of minorities. Public housing in the United States is dominated by minorities, public housing is a large consumer of residential energy. Consequently, this project is a logical merging of these two factors and an attempt to somehow influence energy savings through improving public housing residents` energy-consumption practices. This final report attempts to capture the results of this current demonstration, and incorporate the historical basis for today`s results by renewing the efforts that preceded the implementation of energy conservation practices training in selected public housing developments.

  19. Final report on implementation of energy conservation practices training in selected public housing developments

    SciTech Connect

    Not Available

    1991-10-01

    This report on the implementation of energy conservation practices training in selected public housing developments represents an initiative of the Research and Education Division, Office of Minority Economic Impact, US Department of Energy. The Office of Minority Economic Impact (MI) was created by Congress in 1979, within the US Department of Energy, to afford the Secretary advice on the effect policies, regulations and other actions of DOE respecting minority participation in energy programs. The Director of MI is responsible for the conduct of ongoing research into the effects, including socio-economic and environmental, of national energy programs, policies, and regulations of the Department of minorities. Public housing in the United States is dominated by minorities, public housing is a large consumer of residential energy. Consequently, this project is a logical merging of these two factors and an attempt to somehow influence energy savings through improving public housing residents' energy-consumption practices. This final report attempts to capture the results of this current demonstration, and incorporate the historical basis for today's results by renewing the efforts that preceded the implementation of energy conservation practices training in selected public housing developments.

  20. Energy and Water Conservation Curriculum Development in Irrigation Technology for the Pacific Northwest. Final Report.

    ERIC Educational Resources Information Center

    Peterson, James R.

    This project was conducted to develop curriculum materials for classes in energy and water conservation for the Irrigation Technology Program at Walla Walla Community College. To develop the curriculum, the principal investigator read and analyzed materials on the subjects of water and energy conservation, participated in a short course on drip…

  1. Monitoring conservative retrofits in single family buildings. Final technical report

    SciTech Connect

    Richardson, C.S.

    1992-12-06

    This study has provided detailed before-and-after information on the ambient and comfort conditions in nine single family buildings, and on the energy consumption of those buildings, for one or more energy conservation retrofits. The data were recorded in such a manner that as well as being able to determine the savings from the retrofits and the influence these retrofits have on the comfort conditions of the residence, the effects of the retrofits on time-of-day usage are also determinable. The following are included in appendices: a table of participant`s names, site addresses and retrofit; significant dates and appropriate comments; a day of data and an annotated data set; pre-retrofit and post-retrofit audit data sheets; and usage history.

  2. Colorado Better Buildings Project Final Report

    SciTech Connect

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  3. TX-100 manufacturing final project report.

    SciTech Connect

    Ashwill, Thomas D.; Berry, Derek S.

    2007-11-01

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three

  4. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  5. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  6. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  7. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the...

  8. The Midwest State Archives Guide Project: An Evaluation. [Final Report.

    ERIC Educational Resources Information Center

    Evans, Max J.; And Others

    This document serves as the final report to the National Historical Publications and Records Commission (NHPRC) of the work of the Midwest State Archives Guide Project. The project involved the state archives in Minnesota, Illinois, Indiana, and Wisconsin, and was expected to contribute to a projected national guide project database, though when…

  9. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Project Review Under Section 3.8 of the Compact § 401.36 Water...

  10. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  11. Energy Storage and Distributed Energy Generation Project, Final Project Report

    SciTech Connect

    Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

    2008-03-31

    This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

  12. Energy Conservation Projects to Benefit the Railroad Industry

    SciTech Connect

    Clifford Mirman; Promod Vohra

    2009-12-31

    The Energy Conservation Projects to benefit the railroad industry using the Norfolk Southern Company as a model for the railroad industry has five unique tasks which are in areas of importance within the rail industry, and specifically in the area of energy conservation. The NIU Engineering and Technology research team looked at five significant areas in which research and development work can provide unique solutions to the railroad industry in energy the conservation. (1) Alternate Fuels - An examination of various blends of bio-based diesel fuels for the railroad industry, using Norfolk Southern as a model for the industry. The team determined that bio-diesel fuel is a suitable alternative to using straight diesel fuel, however, the cost and availability across the country varies to a great extent. (2) Utilization of fuel cells for locomotive power systems - While the application of the fuel cell has been successfully demonstrated in the passenger car, this is a very advanced topic for the railroad industry. There are many safety and power issues that the research team examined. (3) Thermal and emission reduction for current large scale diesel engines - The current locomotive system generates large amount of heat through engine cooling and heat dissipation when the traction motors are used to decelerate the train. The research team evaluated thermal management systems to efficiently deal with large thermal loads developed by the operating engines. (4) Use of Composite and Exotic Replacement Materials - Research team redesigned various components using new materials, coatings, and processes to provide the needed protection. Through design, analysis, and testing, new parts that can withstand the hostile environments were developed. (5) Tribology Applications - Identification of tribology issues in the Railroad industry which play a significant role in the improvement of energy usage. Research team analyzed and developed solutions which resulted in friction

  13. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Hobble Creek Restoration Project Final Environmental Assessment AGENCY: Office of the Assistant Secretary... with the Final Environmental Assessment--East Hobble Creek Restoration Project. These two agencies have... Restoration Project. The Final Environmental Assessment has been completed in conjunction with the June...

  14. Shrimp monitor/locator for conservation of fuel. Final report

    SciTech Connect

    Not Available

    1980-01-01

    A demonstration project of a new type Shrimp Detector/Monitor has been completed. The test project proved the efficiency of the Shrimp Monitor/Detector in detecting shrimp, in identifying the number and size, in real time, but indicated that improvement could be effected which would enhance the operation. Data obtained from the test cruises indicate significant savings in diesel fuel will occur for those trawlers using the Shrimp Monitor/Detector in place of the usual trynet operation; 25% savings for the series model number 400, (the prototype tested) and expected 35%+ if the advanced series model number 500 were used. Fabrication and operational costs for the Shrimp Monitor/Detector are reasonable and well within the financial abilities of the usual large offshore trawler. Research and testing during this program resulted in the design of an advanced model incorporating significant improvements, and fabrication was commenced but the extra cost involved beyond the set value of this contract made the further experiments non-viable. Recommendations have been submitted for an extended program to fabricate and test the advanced model series number 500 which may be of more value and interest, market use, to the operating offshore shrimp trawlers. A marketing/sales program will be instituted to place the Shrimp Monitor/Detector in the commercial area serving the shrimp fleet.

  15. Real world financing opportunities for energy conservation projects

    SciTech Connect

    Tramonte, D.J.

    1988-01-01

    Do you have the resources, dollars, people expertise and general know-how to do all the energy conservation measures. If you have the funds, do it yourself. Historically you would save more if you hired a private concern because that is the only job the contractor does for you. You have other hats to wear and fires to put out. Using third-party financing can be a good decision based on your specific needs. Procrastination is not the answer - the cost of delay is extensive. Financing energy conservation measures is no different from financing your automobile or home. If the benefits outweigh the negatives, the answer is obvious. Remember, in any case of using private sector financing, your are joining a partnership arrangement. The only way to succeed is to be honest with each other on the front end. There need not be any surprises. Any reputable company will gladly have your attorney evaluate all agreements, amortization schedules, and attachments. Real world financing alternatives will continue to change as the market matures. It's not too good to be true. It is no more than a vehicle to make the efforts of capital improvements streamlined. The money or financing is the catalyst to the project and makes the other areas meld.

  16. The Conservation Effects Assessment Project (CEAP): The U.S. experience in determining a national scale natural resource and conservation needs assessment

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Conservation Effects Assessment Project (CEAP) was initiated to establish a scientific understanding of the impacts of agricultural conservation practices at the watershed scale, to quantify agricultural conservation practice benefits at the national and regional scales, and to identify outstand...

  17. Rural Textile Workers Literacy Enhancement Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This document consists of the final report and sample curricula from the Rural Textile Workers Literacy Enhancement Project. The final report details how the project was initiated in April 1993 to help employees of five textile and apparel manufacturing companies in southeastern Alabama improve their literacy and numeracy skills. A second…

  18. Migrant Education Dropout Prevention Project. Final Report.

    ERIC Educational Resources Information Center

    Santa Clara County Office of Education, San Jose, CA.

    The Migrant Education Region 1 of the Santa Clara County Office of Education organized a project to examine the conditions of 1454 migrant students in a sample of northern California schools. The project had two primary components: (1) the collection and analysis of information about migrant students, their family and school situations, and their…

  19. Northern Native Languages Project. Final Report.

    ERIC Educational Resources Information Center

    Burnaby, Barbara; And Others

    The Northern Native Language Project was constituted in June 1979 to produce a report which would present information on the present situation regarding language education schools in the project area of Ontario (James Bay, Nakina, and Sioux Lookout) and to make recommendations concerning appropriate action for the future. The introduction of the…

  20. Basic/Technical Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    White River Vocational Technical School, Newport, AR.

    The Basic/Technical Literacy project at White River Vocational Technical School in Arkansas implemented a comprehensive curriculum to raise students' basic reading and technical literacy levels in their chosen skill area. During the project, master vocabulary lists for each skill area were developed, and self-test worksheets and study guides were…

  1. FIP Interim Review Project. Final Report.

    ERIC Educational Resources Information Center

    Whitbeck, John K.

    The Family Independence Project (FIP) Interim Review Project in Washington was mounted in order to give preliminary information on the progress of the FIP program compared to Assistance for Families with Dependent Children (AFDC) site activity, for management planning, and to document short-term outcomes and trends for policy considerations. A…

  2. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  3. Skill Standards and Certification Project. Final Document.

    ERIC Educational Resources Information Center

    North Lake Coll., Irving, TX.

    This document contains the report of a project conducted to make the concept of a world-class work force a reality. The project was intended to design a comprehensive strategy to link elements from the state's existing vocational-technical education, job training, adult education, tech prep, and apprenticeship programs with the components of SCANS…

  4. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  5. VTAE Economic Development Project. Final Report.

    ERIC Educational Resources Information Center

    Klitzke, Elizabeth

    A project was undertaken to redefine the role of vocational, technical, and adult education (VTAE) in economic development in Wisconsin. Included among the objectives of the project were the following: to produce a statewide plan for economic development identifying new linkages among business, industry, labor, and the VTAE system; to develop…

  6. Case Decision Project. Final Report (Process Evaluation).

    ERIC Educational Resources Information Center

    McDaniel, Garry

    The goal of the Case Decision Project (CDP) was to develop a method to improve the efficiency and effectiveness of program management in child protective services in Texas. At the onset of the project, workers across the state had no uniform method of obtaining case information. Therefore, an automated case investigation system was developed.…

  7. Project Final Report: HPC-Colony II

    SciTech Connect

    Jones, Terry R; Kale, Laxmikant V; Moreira, Jose

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  8. Informed Instruction in Mathematics. Final Project Report.

    ERIC Educational Resources Information Center

    Woodward, John; And Others

    This report describes the results of a three-year study, the Informed Instruction Project, that investigated different approaches to mathematics instruction for students with learning disabilities and at-risk for special education services. The project focused on two strands of inquiry: (1) the effects of a computer-based diagnostic assessment…

  9. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  10. Project D. E. A. F. Final Report.

    ERIC Educational Resources Information Center

    Hairston, Ernest E.

    Project D.E.A.F., its introduction and background, purpose, clientele, methodology, and activities, are described. Project D.E.A.F. was established by an expansion grant from the Rehabilitation Service Administration of the Department of Health, Education and Welfare, in cooperation with the Ohio Bureau of Vocational Rehabilitation for the purpose…

  11. ADD Special Projects Grant. Final Report.

    ERIC Educational Resources Information Center

    Wortham, Jocelyn F.

    The purpose of this five-year project was to prepare administrators, general and special education teachers, and parents to meet the needs of children with attention deficit hyperactivity disorders (ADHD). The project developed five self-instructional ADHD inservice preparation manuals for national and state dissemination and implemented an ADHD…

  12. Montana Labor Mobility Project-6716. Final Report.

    ERIC Educational Resources Information Center

    Montana State Employment Service, Helena.

    The report is concerned with the third labor mobility project of the Montana State Employment Service. As it had done previously, the project originally intended undertaking relocation of unemployed persons registered with ES offices throughout the state. However, a large layoff of copper miners in the State during the Spring of 1968 made it…

  13. Tellin' Stories Project. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Ziegler, Mary F.

    The Tellin' Stories Project in Washington, DC, was developed to increase the involvement of economically disadvantaged, often limited English-speaking parents in the educational process of their children. The project connected parents, educators, schools, and communities. The third-year evaluation process consisted of these activities: a focus…

  14. Hispanic Vocational Exploration Project. Final Report.

    ERIC Educational Resources Information Center

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  15. Science for the Eighties: Final Project Report.

    ERIC Educational Resources Information Center

    Magidson, Errol M.

    This report summarizes the goals, objectives, and activities of a project conducted at Kennedy-King College to provide the time and resources for instructors to develop multi-media curriculum materials for use in biology, psychology, and social science courses. Introductory material outlines project objectives in terms of resource development and…

  16. The final focus test beam project

    SciTech Connect

    Burke, D.

    1991-05-01

    An overview is given of the Final Focus Test Beam (FFTB) that is being constructed as a prototype final focus system for a future electron-positron linear collider. This beam line will use as input the 50 GeV electron beam from the SLC linac, and is designed to reduce the transverse dimensions of the beam spot at the focal point to 1 {mu}m. 5 refs., 2 figs., 1 tab.

  17. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  18. The Conservation Effects Assessment Project (CEAP): a national scale natural resources and conservation needs assessment and decision support tool

    NASA Astrophysics Data System (ADS)

    Johnson, M.-V. V.; Norfleet, M. L.; Atwood, J. D.; Behrman, K. D.; Kiniry, J. R.; Arnold, J. G.; White, M. J.; Williams, J.

    2015-07-01

    The Conservation Effects Assessment Project (CEAP) was initiated to quantify the impacts of agricultural conservation practices at the watershed, regional, and national scales across the United States. Representative cropland acres in all major U.S. watersheds were surveyed in 2003-2006 as part of the seminal CEAP Cropland National Assessment. Two process-based models, the Agricultural Policy Environmental eXtender(APEX) and the Soil Water Assessment Tool (SWAT), were applied to the survey data to provide a quantitative assessment of current conservation practice impacts, establish a benchmark against which future conservation trends and efforts could be measured, and identify outstanding conservation concerns. The flexibility of these models and the unprecedented amount of data on current conservation practices across the country enabled Cropland CEAP to meet its Congressional mandate of quantifying the value of current conservation practices. It also enabled scientifically grounded exploration of a variety of conservation scenarios, empowering CEAP to not only inform on past successes and additional needs, but to also provide a decision support tool to help guide future policy development and conservation practice decision making. The CEAP effort will repeat the national survey in 2015-2016, enabling CEAP to provide analyses of emergent conservation trends, outstanding needs, and potential costs and benefits of pursuing various treatment scenarios for all agricultural watersheds across the United States.

  19. Smart Gun Technology project. Final report

    SciTech Connect

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  20. Pagosa Springs geothermal project. Final technical report

    SciTech Connect

    Not Available

    1984-10-19

    This booklet discusses some ideas and methods for using Colorado geothermal energy. A project installed in Pagosa Springs, which consists of a pipeline laid down 8th street with service to residences retrofitted to geothermal space heating, is described. (ACR)

  1. Final Year Engineering Projects in Australia and Europe

    ERIC Educational Resources Information Center

    Ku, H.; Goh, S.

    2010-01-01

    The paper starts by emphasising that final year engineering projects are regarded important in the training and education of professional engineers in Australia and Europe. The sources of projects available to students were also mentioned. Some Australian universities insist on individual projects but some not, each with their own reasons.…

  2. Wyoming Department of Education Deaf-Blind Project Final Report.

    ERIC Educational Resources Information Center

    Whitson, Joanne B.

    This final report describes activities and accomplishments of the Wyoming Department of Education Deaf-Blind Project, a 4-year federally supported project to identify children who have deaf-blindness and to provide technical assistance in the development of educational services for these children. Major accomplishments of the project included:…

  3. Project Pride. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Greene, Judy

    Project Pride was an Elementary and Secondary Education Act Title VII-funded project for Haitian-born students. The project was in its fifth and final year in 1993-94 at Erasmus Hall High School in Brooklyn (New York). Participating students (n=158) received instruction in English as a Second Language (ESL), native language arts (NLA), and the…

  4. 2+2+2 Dissemination Project Final Report.

    ERIC Educational Resources Information Center

    Sloane, Diana; And Others

    An overview is provided in this three-part final report of a project designed to disseminate information to assist California high schools, Regional Occupation Programs, and colleges in developing and strengthening 2+2+2 programs. Part I reviews the following project objectives: (1) hire a project coordinator and technical assistant; (2) develop a…

  5. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all...

  6. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all...

  7. The NICU Follow-Through Project. Final Report.

    ERIC Educational Resources Information Center

    Bennett, Forrest C.; Hedlund, Rodd E.

    This final report describes activities and accomplishments of the NICU Follow-Through Project, a 3-year project designed to help hospital neonatal intensive care units (NICUs) and community developmental centers serving infants with disabilities or very low birth weights (VLBW) replicate the project's innovative and successful training components.…

  8. Salt River Project`s participation in Arizona`s bald eagle conservation efforts

    SciTech Connect

    Nobel, T.A.

    1996-11-01

    Bald eagle (Haliaeetus leucocephalus) conservation in Arizona, USA, is a prime example of a successful, cooperative environmental management effort. The Salt River Project (SRP) is an active participant in the statewide bald eagle management activities. This paper summarizes the major components of the statewide program and highlights SRP`s participation in these efforts. The Southwestern Bald Eagle Management Committee (SWBEMC) was formed as a means of coordinating interagency projects. Chaired by the Arizona Game and Fish Department (AGFD), the SWBEMC is comprised of 15 state, federal, tribal, and private agencies. Together, these agencies sponsor the Nest Watch Program, a unique and effective program dedicated to the study, conservation, and recovery of bald eagles in the southwest. Other significant components of the bald eagle management program include nest monitoring, nest search activities, winter counts, and demography studies. 7 refs., 4 figs.

  9. NYU Ultracomputer project. Final project summary, 1979-1993

    SciTech Connect

    Gottlieb, A.

    1994-10-01

    This report discusses the following on the Ultracomputer project: simulation studies; network analysis; prototype hardware; VSLI design; coordination algorithms; systems software; application software; and compiler development.

  10. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  11. Javanese-English Dictionary Project. Final Report.

    ERIC Educational Resources Information Center

    Horne, Elinor Clark

    The purpose of the research covered by this final report was to produce a Javanese-English dictionary, the first ever to exist. Source materials were of two major kinds: (1) pre-Revolution sources: the two most recetnly published Javanese dictionaries (see Bibliography, Pigeaud and Poerwadarminta), predating the 1945 Indonesian war for…

  12. Sustaining Jamaica's forests: The protected areas resource conservation project

    NASA Astrophysics Data System (ADS)

    Berke, Philip R.; Beatley, Timothy

    1995-07-01

    This study examines Jamaica's attempt to protect a tropical forest reserve. The biophysical setting, and the types and magnitude of forest development pressures are reviewed. Next, Jamaica's approach to developing new land-use strategies and compatible environmental protection and economic development programs are examined. Finally, the practical and theoretical implications by which institutions can be designed to encourage planning for sustainable development are reviewed. The implications suggest how to provide an appropriate mix of cooperation and market competition, by which people acting in their own interests accomplish socially equitable economic development, while protecting the environment for the benefit of future generations. The experience illustrates that effective long-term protection of natural areas requires the building of local relationships and support, the development of local economic activities supportive of conservation, the defining of clear boundaries, and significant monitoring and enforcement. Long-term protection of the Blue and John Crow mountains, and other important natural areas of Jamaica, will also require the development of a workable and enforceable system of land-use planning for the island, and adjustments to the economic incentive structure so that sustainable, nonextractive uses of natural capital are placed on equal footing with other economic uses (e.g., coffee production).

  13. Math Network Curriculum Project. Project Summary; Final Report.

    ERIC Educational Resources Information Center

    San Francisco State Univ., CA.

    This document summarizes the work of the Math Curriculum Project at San Francisco State University. The project developed seven curriculum units for the middle school mathematics program, using microcomputers as a problem solving tool to foster mathematical thinking and develop insights into mathematical concepts. They also created a prototype…

  14. Workplace Environmental Literacy Project (WELP). Final Report.

    ERIC Educational Resources Information Center

    North Orange County Community Coll. District, Fullerton, CA.

    A project was conducted to determine formal and informal competencies based on an expanded definition of workplace environmental literacy. A secondary goal was to develop a compact between employers and training program graduates whereby graduates would have preferential access to employment opportunities. Issues that arose during the…

  15. HOME HEALTH AIDE TRAINING PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    Greater New Haven Community Council, CT.

    THE HOME HEALTH AIDE PERFORMS SIMPLE PERSONAL CARE FUNCTIONS UNDER NURSING SUPERVISION IN THE HOME CARE OF AN ILL OR DISABLED PERSON. THE PROJECT OBJECTIVES WERE TO TRAIN AS AIDES 30 MEN AND WOMEN AGE 45 YEARS AND OLDER WITH LIMITED INCOMES TO MEET A COMMUNITY EMPLOYMENT NEED AND TO EXPERIMENT IN RECRUITMENT, SELECTION, TRAINING, AND EMPLOYMENT…

  16. Language Integrated Technology Project Final Evaluation Report.

    ERIC Educational Resources Information Center

    Stiegemeier, Lois

    The goal of the Language Integrated Technology Grant Project (LIT) consortium was to help provide critical components of successful reading programs through a combination of proven computer/print programs and teacher training. Through leadership provided by the Educational Service District 113 (Olympia, Washington), the LIT consortium of schools…

  17. Jefferson County Adult Reading Project. Final Report.

    ERIC Educational Resources Information Center

    Jefferson County Board of Education, Louisville, KY.

    The 1980-81 Jefferson County (Kentucky) Adult Reading Program served 601 students functioning below 6.0 grade level during the 1980-81 year. The project's instructional methods and materials were developed based on the experiences of the program for the previous two years. The program was considered a success not only from the viewpoint of the…

  18. Employer Needs Assessment Project: Final Report.

    ERIC Educational Resources Information Center

    Klinman, Debra G.

    In the summer and spring of 1980 Mercer County Community College undertook a large-scale employer needs assessment project, during which 1,140 Mercer County employers were contacted in order to: (1) assess employers' practices and preferences in the recruitment of personnel; (2) determine employer satisfaction with the College's ability to educate…

  19. Workplace Skills Enhancement Project. Final Report.

    ERIC Educational Resources Information Center

    Seattle-King County Private Industry Council, Seattle, WA.

    The Workplace Skills Enhancement Project was provided by the Seattle-King County Private Industry Council in Partnership with the Employment Opportunities Center and the Refugee Federation Service Center. Of the 150 participants in the program, 137 were Asian. Workplace literacy training was generally advertised as a voluntary program available to…

  20. Elderly Service Workers' Training Project. Final Report.

    ERIC Educational Resources Information Center

    Harvey, Dexter; Cap, Orest

    The Elderly Service Workers' Training Project (ESWTP) was designed to identify the problems encountered by human service workers in their daily contact with older adults. A needs assessment (mail survey and structured personal interview) was conducted throughout Manitoba to identify and document the scope of human service workers' on-the-job…

  1. Labor Exchange Skills Project. Final Report.

    ERIC Educational Resources Information Center

    Dietrich, Eleanor; Hendrickson-Larson, Joanna; Hoppe, Ruth; Paige, Bruce; Rosenow, Steve

    The Labor Exchange Skills Project, which was conducted under the sponsorship and direction of the U.S. Department of Labor, Employment and Training Administration, was designed to develop a labor exchange skills database (ETA) that would improve the usability of many Department of Labor applications and products developed by other public and…

  2. Performance Metrics Research Project - Final Report

    SciTech Connect

    Deru, M.; Torcellini, P.

    2005-10-01

    NREL began work for DOE on this project to standardize the measurement and characterization of building energy performance. NREL's primary research objectives were to determine which performance metrics have greatest value for determining energy performance and to develop standard definitions and methods of measuring and reporting that performance.

  3. Graduate/Employer Followup Project. Final Report.

    ERIC Educational Resources Information Center

    Ohanneson, Greg; And Others

    A project was undertaken to explore the prospects of conducting employer followup surveys concerning the graduates of a selected vocational program and to devise a procedure that would categorize the small number of employers to be sampled in such a way that useful data for possible program change could be obtained and analyzed. During the…

  4. Trucking Industry Training Project. Final Report.

    ERIC Educational Resources Information Center

    Sanburn, Donald D.

    The report was prepared under a grant made to investigate the possibilities of establishing an organized system of training for the trucking industry. It discusses attempts to disseminate information on training, learned through operation of an experimental and demonstration project in Pico Rivera, California. It discusses problems of compliance…

  5. Microprocessors in Education Research Project. Final Report.

    ERIC Educational Resources Information Center

    Avons, S. E.; And Others

    This 3-year research project, centered on the cognitive psychology of child-computer interaction, focused on the use of microcomputers for teaching specific topics in mathematics and science. In particular, issues arising from the use of computer-based simulations to promote learning (including the nature of the information displayed, the degree…

  6. Southeast geysers effluent pipeline project. Final report

    SciTech Connect

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept was feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.

  7. American History Laboratory Project. Final Report.

    ERIC Educational Resources Information Center

    Taylor, William R.

    The results of an experimental project in American history which introduced to students the methods of historical investigation in specific historical areas through small group research rather than through the college survey course are described in this report. Discussed are (1) the course organization, consisting of two semester units in which…

  8. College Cost Containment Project. Final Report.

    ERIC Educational Resources Information Center

    Lemke, Darrell

    In response to serious concerns about the dramatic increases in college and university costs, the Department of Education solicited proposals in May 1987 for innovative projects to explore means of cost reduction or containment which promise significant cost savings, whether accrued in the short- or long-term. The solicitation for cost containment…

  9. Project Stretch Final Narrative Report. Year III.

    ERIC Educational Resources Information Center

    American Camping Association, Martinsville, IN.

    In June, 1979, the American Camping Association implemented Project STRETCH (Strategies to Try out Resources to Enhance the Training of Camp Directors serving the Handicapped), a nationwide in-service training program for personnel providing services to handicapped children and youth in regularly and specially designed camping and outdoor…

  10. Coal Manpower Projections: 1980. Final Report.

    ERIC Educational Resources Information Center

    Clague, Ewan

    The National Petroleum Council has projected a 1980 bituminous coal production of 910 million tons. On that basis, the study estimates the manpower which will be required to produce that volume of coal. On the assumption of a productivity increase of two percent per year from 1974 onwards, the 1980 coal output will require a work force of…

  11. Project Reach: Final Report--Year 2.

    ERIC Educational Resources Information Center

    McClelland, Samuel D.

    The second year of Project Reach, a Federally funded two-year program, pursued two tactics for increasing the adult basic education (ABE) program relevance and effectiveness in South Bend, Indiana: (1) the training/hiring of ABE students as media paraprofessionals, and (2) a media enrollment campaign of various media promotions (television/radio…

  12. Physically Handicapped in Science: Final Project Report.

    ERIC Educational Resources Information Center

    O'Brien, Maureen B.; And Others

    A two-year project was conducted by St. Mary's Junior College to improve the science literacy of visually-impaired students (VIS) through the adaptation of instructional methods and materials. A four-step process was used: (1) learning materials were reviewed to identify problem areas; (2) preliminary adaptations were made based on the review; (3)…

  13. VTAE Professional Development Project. Final Report.

    ERIC Educational Resources Information Center

    Strohbusch, Mark; Baldus, Lorayne

    A project was undertaken to coordinate up-to-date staff professional development on a regional or state basis in the state of Wisconsin. An earlier study had recommended more specific information and hiring of a staff development coordinator. The "Coordination of Efforts in the Vocational, Technical, and Adult Education (VTAE) System for Specific…

  14. Virginia Labor Mobility Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Virginia Employment Commission, Richmond. Research, Statistics, and Information Div.

    The Appalachian region of Southwest Virginia was selected as a surplus labor area in a pilot project to show the effectiveness of using financial assistance to increase mobility and reduce unemployment. Most of the workers were relocated in Alexandria, Newport News, Richmond, and Petersburg. Of the 920 unemployed workers interviewed, 200 were…

  15. The MICA Project: A Final Look.

    ERIC Educational Resources Information Center

    Roecks, Alan L.

    1979-01-01

    Evaluation of the MICA project (management of instruction with computer assistance) revealed that the supporting software system was efficient and cost-effective, the instruction was adequate, there was no difference in student achievement, and few changes were necessary in order to implement the program. (Author/IRT)

  16. Vermont gasifier project. Final report, Phase I

    SciTech Connect

    1995-07-01

    This report presents an engineering status report for the Vermont gasifier project. Technical areas of concern are discussed with the cyclone performance, agglomeration problems in the combustor, particlate emissions, valve design, deflagration venting, gasifier and combustion blower surge control, and other related areas. Attachments pertaining to the drawing and specification register are included.

  17. ADD Teacher Inservice Project. Final Grant Report.

    ERIC Educational Resources Information Center

    Edwards, Mark C.; Schulz, Eldon G.

    The report describes activities and achievements of the Attention Deficit Disorder (ADD) Teacher Inservice Project. The inservice program was developed using a formal process to identify the critical issues related to ADD awareness, assessment, and intervention. Program content was designed to address critical issues identified in the research…

  18. Native Hawaiian Educational Assessment Project. Final Report.

    ERIC Educational Resources Information Center

    Kamehameha Schools/Bernice Pauahi Bishop Estate, Honolulu, HI.

    This report documents the educational needs of Native Hawaiians across ecosystem levels. Identifying the unique educational needs of Native Hawaiians and effective Native American and local programs that meet the unique educational needs of native Hawaiians, this project works within certain parameters: (1) part of a continuous needs assessment,…

  19. Final Report, SD-265; Project TACT.

    ERIC Educational Resources Information Center

    Air Force Systems Command, L.G. Hanscom Field, MA. Electronic Systems Div.

    The project objective has been to determine what creative thought processes can best take advantage of new technology in computer hardware and software. The plan has been to acquire or develop on-line computer systems of significant mathematical power, and to explore their use in vivo in teaching and research situations. The main product of…

  20. Minewater heat recovery project. Final Technical report

    SciTech Connect

    1992-04-01

    This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

  1. HOSPITALITY EDUCATION CURRICULUM DEVELOPMENT PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    DOMMER, CAROLYN

    THE PURPOSE OF THE PROJECT WAS TO GAIN INFORMATION USEFUL IN DEVELOPING PROGRAMS FOR PREPARING PERSONS FOR EMPLOYMENT IN OCCUPATIONS INVOLVING HOME ECONOMICS KNOWLEDGE AND SKILLS AND FOR PREPARING TEACHERS. THE INITIAL CURRICULUM IN HOSPITALITY EDUCATION, TRAINING IN TRADE AND PERSONAL SERVICE OCCUPATIONS PROVIDING FOOD, LODGING, AND RECREATION,…

  2. Bilingual Adult Basic Education Project. Final Report.

    ERIC Educational Resources Information Center

    Graham, Janet Roth

    The Bilingual Adult Basic Education Project provided bilingual life skills instruction, counseling, and informational services to approximately 150 non-English-dominant adults across Pennsylvania by means of contracts to local education agencies. Students were pre- and post-tested in English and/or their native language to measure their growth in…

  3. Energy Conservation Field Projects. Phase 2: External Evaluation. Document II: Appendices.

    ERIC Educational Resources Information Center

    Stanley Associates, Edmonton (Alberta).

    Provided are appendices which contain supporting documentation related to an external evaluation of the Phase 2: Energy Conservation Field Projects. Objectives of this program were to: test the generalizability of the energy conservations measures outlined in "Guidelines for Conserving Energy in Alberta Schools" and augment these guidelines as…

  4. Energy Conservation: Field Projects. Phase 2: External Evaluation. Document 1: Report.

    ERIC Educational Resources Information Center

    Stanley Associates, Edmonton (Alberta).

    Objectives of Phase 2: Energy Conservation Field Projects were to: test the generalizability of the energy conservation measures outlined in "Guidelines for Conserving Energy in Alberta Schools" and augment these guidelines as required; develop standards of energy consumption for Alberta schools by school type and size, and on the basis of…

  5. Final Project Report Project 10749-4.2.2.1 2007-2009

    SciTech Connect

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  6. Final performance report for Project JEM

    SciTech Connect

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  7. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  8. Alaska Wood Biomass Energy Project Final Report

    SciTech Connect

    Jonathan Bolling

    2009-03-02

    The purpose of the Craig Wood Fired Boiler Project is to use waste wood from local sawmilling operations to provide heat to local public buildings, in an effort to reduce the cost of operating those buildings, and put to productive use a byproduct from the wood milling process that otherwise presents an expense to local mills. The scope of the project included the acquisition of a wood boiler and the delivery systems to feed wood fuel to it, the construction of a building to house the boiler and delivery systems, and connection of the boiler facility to three buildings that will benefit from heat generated by the boiler: the Craig Aquatic Center, the Craig Elementary School, and the Craig Middle School buildings.

  9. Fuel Cell Forklift Project Final Report

    SciTech Connect

    Cummings, Clifton C

    2013-10-23

    This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

  10. Baltimore residential assistance demonstration project: Final report

    SciTech Connect

    1998-09-01

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  11. Manzanita Hybrid Power system Project Final Report

    SciTech Connect

    Trisha Frank

    2005-03-31

    The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit, and in 1995 the Tribe established the Manzanita Renewable Energy Office. Through the U.S. Department of Energy's Tribal Energy Program the Band received funds to install a hybrid renewable power system to provide electricity to one of the tribal community buildings, the Manzanita Activities Center (MAC building). The project began September 30, 1999 and was completed March 31, 2005. The system was designed and the equipment supplied by Northern Power Systems, Inc, an engineering company with expertise in renewable hybrid system design and development. Personnel of the National Renewable Energy Laboratory provided technical assistance in system design, and continued to provide technical assistance in system monitoring. The grid-connected renewable hybrid wind/photovoltaic system provides a demonstration of a solar/wind energy hybrid power-generating project on Manzanita Tribal land. During the system design phase, the National Renewable Energy Lab estimated that the wind turbine is expected to produce 10,000-kilowatt hours per year and the solar array 2,000-kilowatt hours per year. The hybrid system was designed to provide approximately 80 percent of the electricity used annually in the MAC building. The project proposed to demonstrate that this kind of a system design would provide highly reliable renewable power for community uses.

  12. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  13. 78 FR 51205 - Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... invasive species control and eradication and pursue habitat restoration on offshore cays. Within 5 years of... Fish and Wildlife Service Culebra National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No Significant Impact for the Environmental Assessment AGENCY: Fish and...

  14. 75 FR 34151 - Availability: Final Comprehensive Conservation Plan and Finding of No Significant Impact; Modoc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... managers with a 15-year plan for achieving refuge purposes and contributing toward the mission of the... press releases, updates to constituents, and a Federal Register notice (74 FR 28271, June 15, 2009). The... Fish and Wildlife Service Availability: Final Comprehensive Conservation Plan and Finding of...

  15. 76 FR 50247 - Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Fish and Wildlife Service Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce...

  16. 76 FR 1190 - Back Bay National Wildlife Refuge, City of Virginia Beach, VA; Final Comprehensive Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... Fish and Wildlife Service Back Bay National Wildlife Refuge, City of Virginia Beach, VA; Final Comprehensive Conservation Plan and Finding of No Significant Impact for Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish...

  17. 78 FR 24228 - Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final Comprehensive Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... review and comment following the announcement in the Federal Register on October 29, 2012 ] (77 FR 65574... Fish and Wildlife Service Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final... conservation plan and finding of no significant impact (FONSI) for the Lake Andes National Wildlife...

  18. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    SciTech Connect

    Zhu, Jianting

    2010-03-11

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity and four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  19. Evaluation of the State Energy Conservation Program from program initiation to September 1978. Final report

    SciTech Connect

    Heller, James N.; Grossmann, John R.; Shochet, Susan; Bresler, Joel; Duggan, Noreene

    1980-03-01

    The State Energy Conservation Program was established in 1975 to promote energy conservation and to help states develop and implement their own conservation programs. Base (5) and supplemental (3) programs required states to implement programs including: mandatory thermal-efficiency standards and insulation requirements for new and renovated buildings; mandatory lighting efficiency standards for public buildings; mandatory standards and policies affecting the procurement practices of the state and its political subdivisions; program measures to promote the availability and use of carpools, vanpools, and public transportation; a traffic law or regulation which permits a right turn-on-red; and procedures to carry out a continuing public education effort to increase awareness of energy conservation; procedures which promote effective coordination among local, state, and Federal energy conservation programs; and procedures for carrying out energy audits on buildings and industrial plants. All 50 states and Puerto Rico, Guam, the Virgin Islands, American Samoa, and the District of Columbia participated in the program. The total 1980 energy savings projected by the states is about 5.9 quadrillion Btu's or about 7% of the DOE projected 1980 baseline consumption of just under 83 quads. The detailed summary is presented on the following: information the SECP evaluation; DOE response to the SECP; DOE's role in the program management process; the effectiveness of the states in managing the SECP; the status of program measure implementation; innovative state energy conservation programs; and the evaluation methodology.

  20. Raft River aquaculture project. Final report

    SciTech Connect

    Beleau, M.H.; Woiwode, J.G.

    1980-07-01

    The commercial potential for geothermal aquaculture was evaluated for 2 years at the Department of Energy's Raft River geothermal site in southcentral Idaho. Common carp '(Cyprinus carpio) and channel catfish (Ictalurus punctatus) were selected as culture species. Objectives of the study included investigation of: (1) growth rates; (2) nutrition trials; (3) histological and physiological parameters; (4) bioaccumulation of heavy metals; and (5) reproductive capacity. The second year project efforts were primarily studying the effects of geothermal water on the reproductive capacity of common carp by: (1) determining the effects of geothermal water on gonadal development of common carp; and (2) determining the effects of geothermal water on common carp embryogenesis.

  1. Fairbanks Geothermal Energy Project Final Report

    SciTech Connect

    Karl, Bernie

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  2. Cryogenic Barrier Demonstration Project. Final report

    SciTech Connect

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  3. Combined Final Report for Colony II Project

    SciTech Connect

    Kale, Laxmikant; Jones, Terry; Moreira, Jose

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the results obtained over the performance period of the project.

  4. Final Report. Montpelier District Energy Project

    SciTech Connect

    Baker, Jessie; Motyka, Kurt; Aja, Joe; Garabedian, Harold T.

    2015-03-30

    The City of Montpelier, in collaboration with the State of Vermont, developed a central heat plant fueled with locally harvested wood-chips and a thermal energy distribution system. The project provides renewable energy to heat a complex of state buildings and a mix of commercial, private and municipal buildings in downtown Montpelier. The State of Vermont operates the central heat plant and the system to heat the connected state buildings. The City of Montpelier accepts energy from the central heat plant and operates a thermal utility to heat buildings in downtown Montpelier which elected to take heat from the system.

  5. Final Report Navajo Transmission Project (NTP)

    SciTech Connect

    Bennie Hoisington; Steven Begay

    2006-09-14

    The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  6. Emergency Fish Restoration Project; Final Report 2002.

    SciTech Connect

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  7. ECP (Environmental Conservation Project) Report, No. 8, December 1976. ECP State Bibliography.

    ERIC Educational Resources Information Center

    Dean, Norman L., Ed.

    This issue of the Environmental Conservation Project (ECP) Report contains the second supplement to the "ECP State Bibliography," a collection of state energy legislation compiled by the Energy Conservation Project at the Environmental Law Institute. Earlier publications of state legislative actions appear in the October 1975 and January 1976…

  8. Solar Total Energy Project final test report

    SciTech Connect

    Nelson, R.F.; Abney, L.O.; Towner, M.L. )

    1990-09-01

    The Solar Total Energy Project (STEP), a cooperative effort between the United States Department of Energy (DOE) and Georgia Power Company (GPC) located at Shenandoah, Georgia, has undergone several design modifications based on experience from previous operations and test programs. The experiences encountered were discussed in detail in the Solar Total Energy Project Summary Report'' completed in 1987 for DOE. Most of the proposed changes discussed in this report were installed and tested in 1987 as part of two 15-day test programs (SNL Contract No. 06-3049). However, several of the suggested changes were not completed before 1988. These plant modifications include a new distributed control system for the balance of plant (BOP), a fiber a optical communications ring for the field control system, and new control configuration reflecting the new operational procedures caused by the plant modifications. These modifications were tested during a non-consecutive day test, and a 60-day field test conducted during the autumn of 1989. These test were partially funded by SNL under Contract No. 42-4859, dated June 22, 1989. Results of these tests and preliminary analysis are presented in this test summary report. 9 refs., 19 figs., 7 tabs.

  9. Final rapid reactivation project environmental assessment

    SciTech Connect

    1999-02-10

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA.

  10. The Management of Building Environment for Comfort and Energy Conservation. Final Report.

    ERIC Educational Resources Information Center

    North Seattle Community Coll., WA.

    This report presents materials from a Washington State project to develop a curriculum outline of three courses for energy conservation to be used in vocational supplement classes. It first presents results from an industrial survey on which engineers, architects, and mechanical contractors rated objectives for the three courses. Next are provided…

  11. Conservation Effects Assessment Project – CEAP – National Research Cooperation

    Technology Transfer Automated Retrieval System (TEKTRAN)

    CEAP is a multi-agency effort to quantify the environmental benefits of conservation practices used by private landowners participating in selected USDA conservation programs. Within CEAP are a national assessment, focusing on regional and national-scale modeling, and a watershed assessment of cropl...

  12. Project Energize: Outcomes of a Community Confernece on Energy Conservation.

    ERIC Educational Resources Information Center

    Driscoll, Patricia; Deshler, David

    Intended to help program planners and evaluators in providing insight as to what can be accomplished in an educational program dealing with energy conservation, this report is an evaluation of the outcomes of a community conference on energy conservation. There is a brief description of the day-long energy conference attended by 178 people (38 of…

  13. Physics of Correlated Systems, Final Project Report

    SciTech Connect

    Greene, Chris H.

    2014-06-25

    The funding of this DOE project has enabled the P.I. and his collaborators to tackle a number of problems involving nonperturbatively coupled atomic systems, including their interactions with each other and/or with an external electromagnetic field of the type provided by either a continuous-wave or a femtosecond short-pulse laser. The progress includes a new, deeper understanding of an old and famous theory of autoionization lineshapes, developed initially by Ugo Fano in 1935 and later extended in a highly cited 1961 article; the new result specifically is that in a collaboration with the Heidelberg group we have been able to demonstrate an unexpectedly simple behavior in the time domain that is relevant for modern short-pulse lasers. This study also demonstrates a way to modify and even control the lineshapes of unstable atomic and molecular energy levels.

  14. Advanced Blade Manufacturing Project - Final Report

    SciTech Connect

    POORE, ROBERT Z.

    1999-08-01

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  15. (Solar Greenhouse Employment Project). Final report

    SciTech Connect

    Not Available

    1985-01-01

    A project is presented that used workshops to develop the means for the building of low cost passive solar space and water heating devices for farm communities in Pittsboro, North Carolina. Not only the farm community, but also small town and urban people have enthusiastically participated. The reason for the participation in these efforts has been their availability as well as because the devices are low cost and they produce energy savings directly or indirectly. People have come together in workshops to build, for themselves, or others, devices (i.e., vertical wall collectors, window box collectors, bread box hot water heaters and solar greenhouses) that directly impact energy utilization. The frustration however has been that data on energy savings is anecdotal and that the participation of the agriculture community has been residentially related and not agriculturally related.

  16. Blade Manufacturing Improvement Project: Final Report

    SciTech Connect

    SHERWOOD, KENT

    2002-10-01

    The Blade Manufacturing Improvement Project explores new, unique and improved materials integrated with innovative manufacturing techniques that promise substantial economic enhancements for the fabrication of wind turbine blades. The primary objectives promote the development of advanced wind turbine blade manufacturing in ways that lower blade costs, cut rotor weight, reduce turbine maintenance costs, improve overall turbine quality and increase ongoing production reliability. Foam Matrix (FMI) has developed a wind turbine blade with an engineered foam core, incorporating advanced composite materials and using Resin Transfer Molding (RTM) processes to form a monolithic blade structure incorporating a single molding tool. Patented techniques are employed to increase blade load bearing capability and insure the uniform quality of the manufactured blade. In production quantities, FMI manufacturing innovations may return a sizable per blade cost reduction when compared to the cost of producing comparable blades with conventional methods.

  17. First Years Together. Final Project Report. Project Enlightenment.

    ERIC Educational Resources Information Center

    Wake County Public School System, Raleigh, NC.

    First Years Together (FYT), a 3-year service and training demonstration project, provided services to 32 high risk or preterm babies and their parents in order to overcome the emotional and developmental effects of hospitalization and a worrisome start. Service was initiated shortly before each baby's discharge from the intensive care unit and…

  18. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  19. Potable water standards project. Final report

    SciTech Connect

    Styron, C.E.; Meyer, H.E.

    1981-04-07

    Under regulations known as the National Interim Primary Drinking Water Regulations, Title 40 - Code of Federal Regulations, Part 141, which became effective on June 24, 1977, the new standard for tritium in public drinking water (20 nCi/l) was 50 times lower than the Radioactivity Concentration Guide (RCG) in use by DOE. At that time it was apparent from data collected in the environmental surveillance program that three Mound wells and nine nearby private and community wells would be out of compliance, in some cases by a factor as high as four. Recognizing that previous actions taken to reduce the levels of tritium in airborne and liquid effluents would have to be supplemented by intensive efforts in order to bring tritium concentrations in local drinking water supplies into compliance with the EPA standard, the Potable Water Standards Project was initiated. A six-phase program was developed for achieving the goals of the project. Phase I had three parts: analyze all pertinent historical data on geohydrology and tritium in the environment for clues to the source or sources of tritium reaching the aquifer; determine needs for additional data to identify the source(s) of tritium; and define and initiate a rainout monitoring program to obtain data to be used in Phase III. Research in the other five phases was divided into the following categories: conduct a field program involving additional test borings, observation wells, and monitoring to obtain required data to identify source(s); model data, evaluate results, and identify source(s) of tritium; develop a program of corrective action to curtail or eliminate the source(s) of tritium; implement the program of corrective action; and evaluate subsequent monitoring data to ensure that correction has been achieved. (JGB)

  20. Wastewater Triad Project: Final Summary Report

    SciTech Connect

    Walker, J.F.

    2001-12-27

    the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), and Land Disposal Restrictions (LDR) regulations; and (5) deploy state-of-the art technologies that have applications across the DOE complex. Partnerships were developed with DOE technology development agencies, private-sector companies, and other DOE sites to accomplish implementation of these technologies.

  1. Assessment and Improvement of Related Services (AIRS) Project. Final Report.

    ERIC Educational Resources Information Center

    McClelland, Robert A.; Hirata, Glenn T.

    The document presents the final report of the Assessment and Improvement of Related Services (AIRS) Project, an effort to assess the impact and effectiveness of special education related services in Hawaii. Each of the four project objectives focused on accomplishment of one of the evaluation types specified in the Context-Input-Process-Product…

  2. Multi-County Assessment of Adult Needs Project: Final Report.

    ERIC Educational Resources Information Center

    McLennan Community Coll., TX.

    The document is a summarized final report of the Multi-County Assessment of Adult Needs Project (MAP) which took place in central Texas (Bosque, Falls, Hill, and McLennan Counties). It summarizes the major activities and accomplishments of the project and contains all materials except Attachments 1 and 2, the reports on Phase I (Survey of Adult…

  3. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  4. Student Assistance Program Demonstration Project Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Pollard, John A.; Houle, Denise M.

    This document presents the final report on the evaluation of California's model student assistance program (SAP) demonstration projects implemented in five locations across the state from July 1989 through June 1992. The report provides an overall, integrated review of the evaluation of the SAP demonstration projects, summarizes important findings…

  5. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  6. Latin American Literacy Partnership Project. Final Formative Evaluation.

    ERIC Educational Resources Information Center

    Watt, David L. E.

    This final evaluation of the 1991-92 program year of the Latin American literacy Project, designed to foster English language literacy in Spanish-speaking families in Canada, is intended as a formative report, American Literacy Project is intended as a formative report, assessing the changes in the students' language proficiency and the progress…

  7. [Discussion on water conservancy projects and schistosomiasis control in Poyang Lake area].

    PubMed

    Liu, Dao-Nan

    2013-02-01

    According to the schistosomiasis endemic situation in the Poyang Lake area, this paper analyzes the relationship between the water conservancy projects and schistosomiasis control, and reviews and discusses the effects of the Water Level Control Project of Poyang Lake, the Lake Dike Slope Hardening Project, and the Lifting Delta and Descending Beach Project on Oncomelania snail control. PMID:23687826

  8. Project GROW. Final Project Report, January 1989 to June 30, 1989.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    This document contains a final project report and curriculum modules from Project GROW, which measured the impact of training on the self-esteem and career awareness of homeless and single parents/displaced homemakers before and after program completion. Project GROW resulted from Project WORTH (Work Opportunity Readiness for the Homeless). The…

  9. HIP densification project. Final CRADA report

    SciTech Connect

    Franco-Ferreira, E.A.; Finkelstein, W.

    1997-08-29

    An investigation was conducted to evaluate the use of HIPed aluminum castings as near-net-shape blanks for large electrostatic focusing electrodes in ion lithography machines. The electrodes must have very smooth finishes which are free of pores and other defects. This has heretofore been achieved by rough-machining the blanks out of large forged aluminum billets and final diamond-turning. The use of a near-net-shape casting for the blank was expected to save a significant amount of money and time. The test was conducted on a single cast blank which was supplied by the Partner in the HIPed and stress relieved condition. Rough machining and diamond turning operations conducted by LMES/ER revealed that the casting contained unacceptably large defects. The conclusion was reached that HIPed aluminum castings in the large sizes and of the quality levels required would probably be unobtainable in a cost-effective manner. An alternative approach, using ring forgings assembled by electron beam welding was proposed and investigated by LMES/ER. Although an electrode blank was not obtained, the study indicated that this approach would be successful and cost-effective.

  10. Ice Load Project Final Technical Report

    SciTech Connect

    McCoy, Timothy J.; Brown, Thomas; Byrne, Alex

    2014-10-30

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of an integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the moving ice

  11. WSF Biodiesel Demonstration Project Final Report

    SciTech Connect

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research and analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and

  12. Helical Screw Expander Evaluation Project. Final report

    SciTech Connect

    McKay, R.

    1982-03-01

    A functional 1-MW geothermal electric power plant that featured a helical screw expander was produced and then tested in Utah in 1978 to 1979 with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing operation on two-phase geothermal fluids. The Project also produced a computer-equipped data system, an instrumentation and control van, and a 1000-kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Additional testing was performed in Mexico in 1980 under a cooperative test program using the same test array, and machine efficiency was measured at 62% maximum with the rotors partially coated with scale, compared with approximately 54% maximum in Utah with uncoated rotors, confirming the importance of scale deposits within the machine on performance. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.

  13. SMAP Verification and Validation Project - Final Report

    NASA Technical Reports Server (NTRS)

    Murry, Michael

    2012-01-01

    In 2007, the National Research Council (NRC) released the Decadal Survey of Earth science. In the future decade, the survey identified 15 new space missions of significant scientific and application value for the National Aeronautics and Space Administration (NASA) to undertake. One of these missions was the Soil Moisture Active Passive (SMAP) mission that NASA assigned to the Jet Propulsion Laboratory (JPL) in 2008. The goal of SMAP1 is to provide global, high resolution mapping of soil moisture and its freeze/thaw states. The SMAP project recently passed its Critical Design Review and is proceeding with its fabrication and testing phase.Verification and Validation (V&V) is widely recognized as a critical component in system engineering and is vital to the success of any space mission. V&V is a process that is used to check that a system meets its design requirements and specifications in order to fulfill its intended purpose. Verification often refers to the question "Have we built the system right?" whereas Validation asks "Have we built the right system?" Currently the SMAP V&V team is verifying design requirements through inspection, demonstration, analysis, or testing. An example of the SMAP V&V process is the verification of the antenna pointing accuracy with mathematical models since it is not possible to provide the appropriate micro-gravity environment for testing the antenna on Earth before launch.

  14. Aerogel commercialization pilot project. Final program report

    SciTech Connect

    1996-02-13

    Aerogels are extremely light weight, high surface area, very insulative materials that offer many potential improvements to commercial products. Aerogels have been the subject of extensive research at Department of Energy Laboratories and have been considered one of the technology most ready for commercialization. However, commercialization of the technology had been difficult for the National Laboratories since end users were not interested in the high temperature and high pressure chemical processes involved in manufacturing the raw material. Whereas, Aerojet as a supplier of rocket fuels, specialty chemicals and materials had the manufacturing facilities and experience to commercially produce aerogel-type products. Hence the TRP provided a link between the technology source (National Laboratories), the manufacturing (Aerojet) and the potential end users (other TRP partners). The program successfully produced approximately 500 ft{sup 2} of organic aerogel but failed to make significant quantities of silica aerogel. It is significant that this production represents both the largest volume and biggest pieces of organic aerogel ever produced. Aerogels, available from this program, when tested in several prototype commercial products were expected to improve the products performance, but higher than expected projected production costs for large scale manufacture of aerogels has limited continued commercial interest from these partners. Aerogels do, however, offer potential as a specialty material for some high value technology and defense products.

  15. Baltimore Zoo digester project. Final report. [Elephants

    SciTech Connect

    Gibson, P.W.

    1980-01-01

    The results of a project to produce methane using the manure from zoo animals as a feedstock is presented. Two digesters are in operation, the first (built in 1974) utilizing wastes from the Hippo House and a second (built in 1980) utilizing wastes from the Elephant House. Demonstrations on the utilization of the gas were performed during zoo exhibits. The Elephant House Digester has a capacity of 4200 gallons and a floating gas dome which can retain at least 150 cu ft of gas. Solar energy has been incorporated into the design to maintain digester temperature at 95/sup 0/F. The system produces 50 cu ft per day. After cleaning the gas, it is used to generate electricity to power an electric light, a roof fan, and an air conditioner. The gas is also used to operate a gas range and a gas lamp. During the opening day exhibit, 50 meals were cooked using the bio-gas from just 2 elephants. (DMC)

  16. The Choptank Watershed Wetland Conservation Effects Assessment Project: Monitoring the Effect of Wetland Conservation Practices on Water Quality

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Choptank Watershed Wetland Conservation Effects Assessment Project (CEAP) brings together an interdisciplinary group of experts and resources from multiple federal agencies and the University of Maryland to assess the ability of native, restored, and prior-converted wetlands on cropland to impro...

  17. Innovative subsurface stabilization project -- Final Report

    SciTech Connect

    Loomis, G.G.; Zdinak, A.P.; Bishop, C.W.

    1996-11-01

    This is a report of results of applying four innovative grouting materials and one commercially available material for creating monoliths out of buried waste sites using jet grouting. The four innovative materials included a proprietary water-based epoxy, an Idaho National Engineering Laboratory-developed two-component grout that resembles hematite when cured with soil, molten low-temperature paraffin, and a proprietary iron oxide cement-based grout called TECT. The commercial grout was Type-H high-sulfate-resistant cement. These materials were tested in specially designed cold test pits that simulate buried transuranic waste at the Idaho National Engineering Laboratory. In addition to the grouting studies, specially designed field-scale permeameters were constructed to perform full-scale controlled mass balance hydraulic conductivity studies. An ungrouted field-scale permeameter contained simulated buried waste and soil and was left ungrouted, and a second identical field-scale permeameter was grouted with commercial-grade Type-H cement. The field demonstrations were performed in an area referred to as the Cold Test Pit at the Idaho National Engineering Laboratory. The Cold Test Pit is adjacent to the laboratory`s Radioactive Waste Management Complex. At the complex, 2 million ft{sup 3} of transuranic waste is commingled with 6--8 million ft{sup 3} of soil in shallow land burial, and improving the confinement of this waste is one of the options for final waste disposition. This report gives results of grouting, coring, hydraulic conductivity, and destructive examination of the grouted buried waste matrix.

  18. Final Technical Report. Project Boeing SGS

    SciTech Connect

    Bell, Thomas E.

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  19. Final Report on Atomic Database Project

    SciTech Connect

    Yuan, J., Gui, Z., and Moses, G.A.

    2006-07-18

    Atomic physics in hot dense plasmas is essential for understanding the radiative properties of plasmas either produced terrestrially such as in fusion energy research or in space such as the study of the core of the sun. Various kinds of atomic data are needed for spectrum analysis or for radiation hydrodynamics simulations. There are many atomic databases accessible publicly through the web, such as CHIANTI (an atomic database for spectroscopic diagnostics for astrophysical plasmas) from Naval Research Laboratory [1], collaborative development of TOPbase (The Opacity Project for astrophysically abundant elements) [2], NIST atomic spectra database from NIST [3], TOPS Opacities from Los Alamos National Laboratory [4], etc. Most of these databases are specific to astrophysics, which provide energy levels, oscillator strength f and photoionization cross sections for astrophysical elements ( Z=1-26). There are abundant spectrum data sources for spectral analysis of low Z elements. For opacities used for radiation transport, TOPS Opacities from LANL is the most valuable source. The database provides mixed opacities from element for H (Z=1) to Zn (Z=30) The data in TOPS Opacities is calculated by the code LEDCOP. In the Fusion Technology Institute, we also have developed several different models to calculate atomic data and opacities, such as the detailed term accounting model (DTA) and the unresolved transition array (UTA) model. We use the DTA model for low-Z materials since an enormous number of transitions need to be computed for medium or high-Z materials. For medium and high Z materials, we use the UTA model which simulates the enormous number of transitions by using a single line profile to represent a collection of transition arrays. These models have been implemented in our computing code JATBASE and RSSUTA. For plasma populations, two models are used in JATBASE, one is the local thermodynamic equilibrium (LTE) model and the second is the non-LTE model. For the

  20. Impact of the agricultural research service watershed assessment studies on the conservation effects assessment project cropland national assessment

    Technology Transfer Automated Retrieval System (TEKTRAN)

    USDA initiated the Conservation Effects Assessment Project (CEAP) in 2002 to analyze societal and environmental benefits gained from the increased conservation program funding provided in the 2002 Farm Bill. The Natural Resources Conservation Service (NRCS), Agricultural Research Service (ARS), and...

  1. Petascale Computing Enabling Technologies Project Final Report

    SciTech Connect

    de Supinski, B R

    2010-02-14

    The Petascale Computing Enabling Technologies (PCET) project addressed challenges arising from current trends in computer architecture that will lead to large-scale systems with many more nodes, each of which uses multicore chips. These factors will soon lead to systems that have over one million processors. Also, the use of multicore chips will lead to less memory and less memory bandwidth per core. We need fundamentally new algorithmic approaches to cope with these memory constraints and the huge number of processors. Further, correct, efficient code development is difficult even with the number of processors in current systems; more processors will only make it harder. The goal of PCET was to overcome these challenges by developing the computer science and mathematical underpinnings needed to realize the full potential of our future large-scale systems. Our research results will significantly increase the scientific output obtained from LLNL large-scale computing resources by improving application scientist productivity and system utilization. Our successes include scalable mathematical algorithms that adapt to these emerging architecture trends and through code correctness and performance methodologies that automate critical aspects of application development as well as the foundations for application-level fault tolerance techniques. PCET's scope encompassed several research thrusts in computer science and mathematics: code correctness and performance methodologies, scalable mathematics algorithms appropriate for multicore systems, and application-level fault tolerance techniques. Due to funding limitations, we focused primarily on the first three thrusts although our work also lays the foundation for the needed advances in fault tolerance. In the area of scalable mathematics algorithms, our preliminary work established that OpenMP performance of the AMG linear solver benchmark and important individual kernels on Atlas did not match the predictions of our

  2. Self-Correcting HVAC Controls Project Final Report

    SciTech Connect

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

    2010-01-04

    This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

  3. Tritium research laboratory cleanup and transition project final report

    SciTech Connect

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  4. Augustine Band of Cahuilla Indians Energy Conservation and Options Analysis - Final Report

    SciTech Connect

    Paul Turner

    2008-07-11

    The Augustine Band of Cahuilla Indians was awarded a grant through the Department of Energy First Steps program in June of 2006. The primary purpose of the grant was to enable the Tribe to develop energy conservation policies and a strategy for alternative energy resource development. All of the work contemplated by the grant agreement has been completed and the Tribe has begun implementing the resource development strategy through the construction of a 1.0 MW grid-connected photovoltaic system designed to offset a portion of the energy demand generated by current and projected land uses on the Tribe’s Reservation. Implementation of proposed energy conservation policies will proceed more deliberately as the Tribe acquires economic development experience sufficient to evaluate more systematically the interrelationships between conservation and its economic development goals.

  5. Legacy sample disposition project. Volume 2: Final report

    SciTech Connect

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmental and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions.

  6. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  7. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  8. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  9. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  10. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... project areas. 1468.4 Section 1468.4 Agriculture Regulations of the Department of Agriculture (Continued... FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas. (a) CCC may periodically solicit proposals from the public to establish pilot project areas in...

  11. Conservation.

    ERIC Educational Resources Information Center

    National Audubon Society, New York, NY.

    This set of teaching aids consists of seven Audubon Nature Bulletins, providing the teacher and student with informational reading on various topics in conservation. The bulletins have these titles: Plants as Makers of Soil, Water Pollution Control, The Ground Water Table, Conservation--To Keep This Earth Habitable, Our Threatened Air Supply,…

  12. Quantifying ecosystem services from pastureland in the United States: The conservation effects assessment project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Conservation Effects Assessment Project (CEAP) is a multiagency scientific effort to quantify environmental outcomes of conservation practices applied to private agricultural lands of the United States. Society for Range Management members are familiar with the rangeland CEAP effort but may know...

  13. 45 CFR 1180.70 - Guidelines and standards for museum conservation projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Guidelines and standards for museum conservation projects. 1180.70 Section 1180.70 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS Museum Conservation Program §...

  14. Practicing Sustainability in an Urban University: A Case Study of a Behavior Based Energy Conservation Project

    ERIC Educational Resources Information Center

    Chan, Stuart; Dolderman, Dan; Savan, Beth; Wakefield, Sarah

    2012-01-01

    This case study of the University of Toronto Sustainability Office's energy conservation project, Rewire, explores the implementation of a social marketing campaign that encourages energy efficient behavior. Energy conservation activities have reached approximately 3,000 students and staff members annually, and have saved electricity, thermal…

  15. SOIL AND WATER CONSERVATION PROJECTS AND ACTIVITIES, A GUIDE FOR 4-H CLUB LEADERS.

    ERIC Educational Resources Information Center

    FOSTER, ALBERT B.; FOX, ADRIAN C.

    THIS PUBLICATION WAS PREPARED BY THE SOIL CONSERVATION SERVICE FOR USE WITH YOUTH GROUPS. VARIOUS ACTIVITIES AND PROJECTS ARE PRESENTED WHICH CAN BE USED TO DEVELOP CONCEPTS ABOUT SOIL AND WATER CONSERVATION. IN ORDER TO SIMPLIFY THE PROCESS OF DEMONSTRATING THESE ACTIVITIES, MANY OF THE CONCEPTS ARE PICTORIALLY ILLUSTRATED. THE ACTIVITIES…

  16. When the virtual influences reality. The conservation project of the Toledo Gate in Ciudad Real (Spain)

    NASA Astrophysics Data System (ADS)

    Almagro Vidal, A.; Ramírez González, I.; Clemente San Román, C.

    2015-08-01

    powerful tool for conservation decision making and awareness raising. Furthermore, the interesting results of the final reconstruction hypothesis convinced the technical team responsible for the conservation to alter some aspects of the final project physical interventions in order to focus on some of the features and conclusions discovered through the virtual model study.

  17. The Skills Enhancement Literacy Project of Hawaii. Final Program Model. Final Performance Report. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hawaii Univ., Manoa. Coll. of Education.

    The Skills Enhancement Literacy Project of Hawaii (SELPH) was a demonstration workplace literacy partnership between the College of Education, University of Hawaii-Manoa and the ITT Sheraton Hotels. Four Sheraton Hotels in Waikiki participated in the project. The program was planned, staff and volunteers were recruited, and marketing strategies…

  18. National Traffic Safety Documentation Center Project Definition Study. Final Report.

    ERIC Educational Resources Information Center

    System Development Corp., Falls Church, VA.

    A project definition study was conducted for the development, implementation and operation of a National Traffic Safety Documentation Center. Included in this final comprehensive report are: (1) the results of nationwide surveys of users and sources of traffic safety information; (2) a review of relevant information technology in terms of the…

  19. Leading Curriculum Innovation in Primary Schools Project: A Final Report

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane

    2015-01-01

    This article provides the final report on a research project that investigated the ways in which curriculum innovation can be led successfully in primary schools. Data gathering included 40 semi-structured interviews in 10 successful primary schools in England of varying sizes and types and in a range of geographical and social locations. Findings…

  20. Expressive Arts Project for Young Children with Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia L.

    This final report describes activities and accomplishments of the Expressive Arts Project for Young Children with Disabilities, which developed and evaluated a CD-ROM, ArtSpace. The program, developed on a Macintosh platform, allows the child to either view or make art. It offers real time video, music especially produced to accompany images,…

  1. Oklahoma Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Watts, Jan, Comp.

    This final report describes the activities and accomplishments of the Oklahoma Deaf-Blind Technical Assistance Project, an effort to systematically provide training, resource provision and technical assistance (TA) to approximately 120-155 children and youth with deaf-blindness, their families, educators and service providers. The overall impact…

  2. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  3. Final-Year Education Projects for Undergraduate Chemistry Students

    ERIC Educational Resources Information Center

    Page, Elizabeth

    2011-01-01

    The Undergraduate Ambassadors Scheme provides an opportunity for students in their final year of the chemistry degree course at the University of Reading to choose an educational project as an alternative to practical research. The undergraduates work in schools where they can be regarded as role models and offer one way of inspiring pupils to…

  4. The Pittsburgh Science Technology Society Project: A Final Report.

    ERIC Educational Resources Information Center

    O'Brien, George E., Ed.

    This final report on the inservice education of secondary science teachers for the teaching of science via Science Technology Society (STS) materials lists the major objectives of the project as: (1) write four instructional modules with a science, society and technology focus which address special concerns and needs of the underserved and…

  5. Tom Green County Library Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Vavricka, D. Karen

    The final report of the Tom Green Country Library System (Texas) literacy project details progress toward achievement of 11 objectives. Objectives of the literacy outreach program were to: (1) increase Hispanic enrollment; (2) increase Black enrollment; (3) provide free child care for 4 students to attend 50 tutoring sessions; (4) provide…

  6. Human Relations Training for Educators. Final Evaluation. Project Upper Cumberland.

    ERIC Educational Resources Information Center

    Khanna, J. L.

    Project Upper Cumberland was a three year endeavor which served 16 Tennessee counties. The final report and evaluation, in three documents, summarizes the three innovative programs which it engendered: (1) teacher inservice training, emphasizing human relations; (2) a pilot cultural arts program (art, music, drama) for grades 1-12; and (3) a pilot…

  7. Georgia Deafblind Project, 1995-1999. Final Report.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Exceptional Students Div.

    This final report discusses the activities and outcomes of a 4-year federally funded project designed to meet the critical need in Georgia to provide effective practices in the delivery of educational services to children and youth with deafblindness from birth through 21 years of age and to their families and service providers. Results of the…

  8. Skills Conversion Project: Chapter 2, Executive Summary. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    This final report describes the Skills Conversion Project conducted by The National Society of Professional Engineers under contract to the Department of Labor to study methods of utilizing the large pool of highly skilled unemployed technicians and professional personnel who were formerly employed in the aerospace and defense industries. If…

  9. Learning in Science Project (Form 1-4). Final Report.

    ERIC Educational Resources Information Center

    Waikato Univ., Hamilton (New Zealand).

    The Learning in Science Project investigated teaching and learning in science at the Form 1 to 4 level to identify some of the key difficulties in this subject area and to find ways of overcoming such difficulties. Included in this final report are: (1) brief accounts of the three major phases of the research; (2) a list of papers derived from the…

  10. Tekton Corporation's Wood Waste Briquetting Project. Final report

    SciTech Connect

    Not Available

    1980-07-31

    The purpose of the Wood Waste Briquetting Project was to evaluate and at the same time, develop markets for wood waste briquetted heating fuel and waste wood briquetting equipment. To this end the DOE Northeast Regional Appropriate Technology Small Grant Program awarded Tekton Corporation $31,085 to set up prototype fuel factory to produce, distribute, and test-market densified wood waste fuel which Tekton named ''Tekfuel.'' Tekton set up the plant and fulfilled the project goals during the winter of 1979 to 1980. This final report discusses the project under the following topics: (1) introduction; (2) general overview of briquetting; (3) description of Tekton's Fuel Plant; (4) report on project performance; (5) results of promotional efforts; (6) cost analysis of project; (7) statistical analysis of consumer questionnaires; and (8) prognosis for the future of briquetting. 11 refs.

  11. Admiralty Inlet Pilot Tidal Project Final Technical Report

    SciTech Connect

    Collar, Craig

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  12. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  13. 75 FR 32494 - Energy Conservation for PHA-Owned or Leased Project-Audits, Utility Allowances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... URBAN DEVELOPMENT Energy Conservation for PHA-Owned or Leased Project-Audits, Utility Allowances AGENCY... thereof) are established. PHAs complete energy audits, benefit/cost analyses for individual vs. master... or Leased Project-Audits, Utility Allowances. OMB Approval Number: 2577-0062. Form Numbers:...

  14. Special Education Simulation and Consultation Project: Special Training Project. Final Report. Part I: Results and Learnings.

    ERIC Educational Resources Information Center

    Batten, Murray O.; Burello, Leonard C.

    Presented is the final report of the Special Education Simulation and Consultation (SECAC) Project designed to provide simulation-based inservice training to Michigan building principals. Part I reviews project goals, objectives, procedures, results, and learnings. It is explained that the training employed the Special Education Administrators…

  15. The Midlands Consortium Star Schools Project: Final Report, Final Evaluation Report, Final Evaluation Report Appendices.

    ERIC Educational Resources Information Center

    Midlands Consortium.

    The reports presented in this document describe the results of the first 2 years of the Midlands Consortium Star Schools Project (MCSSP) (October 1, 1988-December 31, 1990). The first report summarizes the major accomplishments of the MCSSP, including: (1) the installation of communications satellites at schools in Alabama, Kansas, Mississippi,…

  16. Kootenai River White Sturgeon Conservation Aquaculture Project : Environmental Assessment.

    SciTech Connect

    US Bonneville Power Administration; Kootenai Tribe of Idaho

    1997-04-01

    Bonneville Power Administration (BPA) is responding to the need to prevent the extinction of the Kootenai River white sturgeon (Acipenser transmontanus) between Libby Dam in Montana and Corra Linn Dam in British Columbia. Construction and operation of Libby Dam altered the natural flow of the Kootenai River, especially the normal May-to-July flows needed for natural reproduction and recruitment. It also affected the river`s biological productivity and the quality of spawning and rearing habitat. As part of its responsibilities under the Northwest Power Act (Pacific Northwest Electric Power Planning and Conservation Act of 1980), BPA must mitigate for losses of fish and wildlife (including related spawning grounds and habitat) that are attributable to power production at federal hydroelectric dams on the Columbia River and its tributaries.

  17. Small Commercial Program DOE Project: Impact evaluation. Final report

    SciTech Connect

    Bathgate, R.; Faust, S.

    1992-08-12

    In 1991, Washington Electric Cooperative (WEC) implemented a Department of Energy grant to conduct a small commercial energy conservation project. The small commercial ``Mom, and Pop`` grocery stores within WEC`s service territory were selected as the target market for the project. Energy & Solid Waste Consultant`s (E&SWC) Impact Evaluation is documented here. The evaluation was based on data gathered from a variety of sources, including load profile metering, kWh submeters, elapsed time indicators, and billing histories. Five stores were selected to receive measures under this program: Waits River General Store, Joe`s Pond Store, Hastings Store, Walden General Store, and Adamant Cooperative. Specific measures installed in each store and description of each are included.

  18. Projected wetland densities under climate change: Habitat loss but little geographic shift in conservation strategy

    USGS Publications Warehouse

    Sofaer, Helen; Skagen, Susan; Barsugli, Joseph J.; Rashford, Benjamin S.; Reese, Gordon; Hoeting, Jennifer A.; Wood, Andrew W.; Noon, Barry R.

    2016-01-01

    Climate change poses major challenges for conservation and management because it alters the area, quality, and spatial distribution of habitat for natural populations. To assess species’ vulnerability to climate change and target ongoing conservation investments, researchers and managers often consider the effects of projected changes in climate and land use on future habitat availability and quality and the uncertainty associated with these projections. Here, we draw on tools from hydrology and climate science to project the impact of climate change on the density of wetlands in the Prairie Pothole Region of the USA, a critical area for breeding waterfowl and other wetland-dependent species. We evaluate the potential for a trade-off in the value of conservation investments under current and future climatic conditions and consider the joint effects of climate and land use. We use an integrated set of hydrological and climatological projections that provide physically based measures of water balance under historical and projected future climatic conditions. In addition, we use historical projections derived from ten general circulation models (GCMs) as a baseline from which to assess climate change impacts, rather than historical climate data. This method isolates the impact of greenhouse gas emissions and ensures that modeling errors are incorporated into the baseline rather than attributed to climate change. Our work shows that, on average, densities of wetlands (here defined as wetland basins holding water) are projected to decline across the U.S. Prairie Pothole Region, but that GCMs differ in both the magnitude and the direction of projected impacts. However, we found little evidence for a shift in the locations expected to provide the highest wetland densities under current vs. projected climatic conditions. This result was robust to the inclusion of projected changes in land use under climate change. We suggest that targeting conservation towards wetland

  19. MIT LMFBR blanket research project. Final summary report

    SciTech Connect

    Driscoll, M.J.

    1983-08-01

    This is a final summary report on an experimental and analytical program for the investigation of LMFBR blanket characteristics carried out at MIT in the period 1969 to 1983. During this span of time, work was carried out on a wide range of subtasks, ranging from neutronic and photonic measurements in mockups of blankets using the Blanket Test Facility at the MIT Research Reactor, to analytic/numerical investigations of blanket design and economics. The main function of this report is to serve as a resource document which will permit ready reference to the more detailed topical reports and theses issued over the years on the various aspects of project activities. In addition, one aspect of work completed during the final year of the project, on doubly-heterogeneous blanket configurations, is documented for the record.

  20. Shawmut hydroelectric redevelopment project. Final technical and construction cost report

    SciTech Connect

    1982-08-01

    This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

  1. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  2. Final Scientific Report - Wind Powering America State Outreach Project

    SciTech Connect

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America State Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.

  3. Mississippi County Community College Solar Photovoltaic Project. Final report

    SciTech Connect

    Turner, W.D.; Deaver, F.K.; Johnson, M.M.; Pugh, T.; Snowden, R.; Wall, J.D.; Williams, J.G.; Yeargan, J.R.

    1980-11-01

    A weather station was maintained in Blytheville, Arkansas, from April 1978 to April 1980. Daily totals of direct normal and global insolation are given, and an hour-by-hour printout of direct normal, global, and diffuse solar radiation for the entire two year period is included. A number of studies were conducted, including daylighting, energy conservation and management, design tradeoffs, and landscaping. The collector selection process included the writing of specifications, providing design data, reviewing the various collector designs, inspecting potential vendor facilities, monitoring on-site tests, and the final selection. A simulation was made of the entire system, including both an electrical and thermal simulation of the photovoltaic array and a thermal simulation of the various buildings. Example printouts of the simulations are included. (LEW)

  4. The Woodlands Metro Center energy study. Case studies of project planning and design for energy conservation

    SciTech Connect

    Not Available

    1980-03-01

    The Woodlands is a HUD Title VII New Town located near Houston, including 22,000 acres; the plan for the new town consists of 6 residential villages, a town center (Metro), and a Trade Center for larger-scale industrial use. Included within the program for each village are schools and commercial activities, as well as employment activities. The Woodlands is planned to be developed over a 26-year period (commenced in 1972) with an ultimate population of 150,000. Following a summary chapter, Chapter II presents background material on The Woodlands and results of the study are summarized. Chapter III describes the project team and its organizational structure. Chapter IV outlines and documents the methodology that was employed in developing, analyzing, and evaluating the case study. The next chapter describes and analyzes the conventional plan, documents the process by which energy-conserving methods were selected, and evaluates the application of these methods to the Metro Center Study area. Chapter VI discusses constraints to implementation and is followed by a final chapter that presents the general conclusions from the case study and suggests directions for further investigation.

  5. Wildlife Protection, Mitigation, and Enhancement Plan, Palisades Project: Final Report.

    SciTech Connect

    Meuleman, G. Allyn

    1986-11-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho and Wyoming to mitigate the losses of wildlife habitat and annual production due to the development and operation of the Palisades Project. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the preferred mitigation plan to wildlife. The interagency work group used the target species Habitat Units (HU's) lost with inundation of the reservoir area as a guideline during the mitigation planning process, while considering needs of wildlife in eastern Idaho and western Wyoming. A total of 37,068 HU's were estimated to be lost as a result of the inundation of the Palisades Reservoir area. Through a series of protection/enhancement projects, the preferred mitigation plan will provide benefits of an estimated 37,066 HU's. Target species to be benefited by this mitigation plan include bald eagle, mule deer, elk, mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, and peregrine falcon.

  6. Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project

    SciTech Connect

    Bigelow, Erik

    2013-01-01

    The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-­hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-based energy recovery and storage system. This technology is being developed at TDI’s facilities to capture and reuse the energy necessary for the company’s core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries

  7. Advanced Turbine Technology Applications Project (ATTAP) and Hybrid Vehicle Turbine Engine Technology Support project (HVTE-TS): Final summary report

    SciTech Connect

    1998-12-01

    This final technical report was prepared by Rolls-Royce Allison summarizing the multiyear activities of the Advanced Turbine Technology Applications Project (ATTAP) and the Hybrid Vehicle Turbine Engine Technology Support (HVTE-TS) project. The ATTAP program was initiated in October 1987 and continued through 1993 under sponsorship of the US Department of Energy (DOE), Energy Conservation and Renewable Energy, Office of Transportation Technologies, Propulsion Systems, Advanced Propulsion Division. ATTAP was intended to advance the technological readiness of the automotive ceramic gas turbine engine. The target application was the prime power unit coupled to conventional transmissions and powertrains. During the early 1990s, hybrid electric powered automotive propulsion systems became the focus of development and demonstration efforts by the US auto industry and the Department of energy. Thus in 1994, the original ATTAP technology focus was redirected to meet the needs of advanced gas turbine electric generator sets. As a result, the program was restructured to provide the required hybrid vehicle turbine engine technology support and the project renamed HVTE-TS. The overall objective of the combined ATTAP and HVTE-TS projects was to develop and demonstrate structural ceramic components that have the potential for competitive automotive engine life cycle cost and for operating 3,500 hr in an advanced high temperature turbine engine environment. This report describes materials characterization and ceramic component development, ceramic components, hot gasifier rig testing, test-bed engine testing, combustion development, insulation development, and regenerator system development. 130 figs., 12 tabs.

  8. How national context, project design, and local community characteristics influence success in community-based conservation projects

    PubMed Central

    Brooks, Jeremy S.; Waylen, Kerry A.; Borgerhoff Mulder, Monique

    2012-01-01

    Community-based conservation (CBC) promotes the idea that conservation success requires engaging with, and providing benefits for, local communities. However, CBC projects are neither consistently successful nor free of controversy. Innovative recent studies evaluating the factors associated with success and failure typically examine only a single resource domain, have limited geographic scope, consider only one outcome, or ignore the nested nature of socioecological systems. To remedy these issues, we use a global comparative database of CBC projects identified by systematic review to evaluate success in four outcome domains (attitudes, behaviors, ecological, economic) and explore synergies and trade-offs among these outcomes. We test hypotheses about how features of the national context, project design, and local community characteristics affect these measures of success. Using bivariate analyses and multivariate proportional odds logistic regressions within a multilevel analysis and model-fitting framework, we show that project design, particularly capacity-building in local communities, is associated with success across all outcomes. In addition, some characteristics of the local community in which projects are conducted, such as tenure regimes and supportive cultural beliefs and institutions, are important for project success. Surprisingly, there is little evidence that national context systematically influences project outcomes. We also find evidence of synergies between pairs of outcomes, particularly between ecological and economic success. We suggest that well-designed and implemented projects can overcome many of the obstacles imposed by local and national conditions to succeed in multiple domains. PMID:23236173

  9. Competency-Based Transfer Pilot Project--Final Report. Executive Summary [and] Competency-Based Transfer Pilot Project: Final Report on House Bill 1909

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    This publication contains the following: (1) Competency-Based Transfer Pilot Project--Final Report. Executive Summary (January 2006); and (2) Competency-Based Transfer Pilot Project: Final Report on House Bill 1909 (January 2005). In 2003, the legislature and governor enacted House Bill 1909 to create a pilot project on competency-based transfer…

  10. Programmable SAW development :Sandia/NASA project final report.

    SciTech Connect

    Brocato, Robert Wesley

    2004-10-01

    This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

  11. Final Report for USGS NEHRP Project 08HQGR0022

    SciTech Connect

    Rodgers, A. J.

    2015-09-29

    This is the final report for United States Geological Survey (USGS) National Earthquake Hazard Reduction Program (NEHRP) Project 08HQGR0022, entitled “Quantifying Uncertainties in Ground Motion Simulations for Scenario Earthquakes on the HaywardRodgers Creek Fault System Using the USGS 3D Seismic Velocity Model and Realistic Pseudodynamics Ruptures”. Work for this project involved three-dimensional (3D) simulations of ground motions for Hayward Fault (HF) earthquakes. We modeled moderate events on the HF and used them to evaluate the USGS 3D model of the San Francisco Bay Area. We also contributed to ground motions modeling effort for a large suite of scenario earthquakes on the HF. Results were presented at conferences (see appendix) and in one peer-reviewed publication (Aagaard et al., 2010).

  12. Conservation.

    ERIC Educational Resources Information Center

    Camp Fire Girls, Inc., New York, NY.

    The first section of this manual has been developed to help leaders and youth examine and gradually understand some of the more complex environmental factors. It helps to explain what things are where and why, why a certain project has been suggested, whether it is a practical one for a given place, and what must be known before it can be…

  13. Final Technical Report - Kotzebue Wind Power Project - Volume II

    SciTech Connect

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  14. Tidd PFBC Demonstration Project: Public final design report

    SciTech Connect

    Not Available

    1992-10-01

    This Public Final Design Report describes the 70 MW(e) Tidd PFBC Demonstration Plant under construction in Brilliant, Ohio. This project is receiving cost-sharing from the US Department of Energy (DOE), and is being administered by the Morgantown Energy Technology Center in accordance with DOE Cooperative Agreement No. DE-FC21-87 MC24132.000. The project is also receiving costsharing from the State of Ohio. This award is being administered by the Ohio Coal Development Office. The Tidd PFBC Demonstration Project is the first utility-scale demonstration project in the US. Its objective is to demonstrate that the Pressurized Fluidized Bed Combustion (PFBC) combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. Detailed design of the plant began in May 1987, leading to the start of construction in April 1988. First coal fire occurred in November 1990, and the three-year test program began in February 1991.

  15. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  16. Assessment of the industrial energy-conservation program. Final report of the Committee on Assessment of the Industrial Energy Conservation Program

    SciTech Connect

    1982-01-01

    Industrial operations in the United States account for some 37% of the nation's consumptions of energy. It has been estimated that this figure will increase to 50% by 1990 unless appropriate industrial energy conservation measures are adopted. However, such measures are difficult to implement in spite of the potential of various existing, emerging, and advanced technologies that can be applied to the problem. Specifically, the application of many industrial energy conservation measures entails high economic, technological, and institutional risks and uncertainties that constrain industries from adopting such measures. Accordingly, in 1975 the federal government started a program designed to mitigate these risks and uncertainties via government-industry partnership arrangements in the interests of national energy conservation. An important element of this program is the Industrial Energy Conservation Program in the Federal Department of Energy (DOE). In June 1980, DOE asked the National Materials Advisory Board, a unit of the National Academy of Sciences-National Research Council, to form a study committee to assess the effectiveness of the Industrial Energy Conservation Program. The committee concluded that federal support embodied in the DOE program, present and planned, is important to conserving additional industrial energy. However, the committee also concluded that the program needs various improvements in project selection and management and in transfer of results to industry. The committee's findings and recommendations and the results of the deliberation of the committee's three panels, a special report on heat and power, and a report on the visit by four members of the committee to Japan are presented.

  17. OVERVIEW OF THE MARK TWAIN LAKE/SALT RIVER BASIN CONSERVATION EFFECTS ASSESSMENT PROJECT

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Mark Twain Lake/Salt River Basin was selected as one of 12 USDA-Agricultural Research Service benchmark watersheds for the Conservation Effects Assessment Project (CEAP) because of documented soil and water quality problems and broad stakeholder interest. The basin is located in northeastern Mis...

  18. Conservation Effects Assessment Project research in the Leon River and Riesel watersheds

    Technology Transfer Automated Retrieval System (TEKTRAN)

    In 2003, the Leon River basin was selected as a Benchmark watershed for the USDA Conservation Effects Project (CEAP) to complement the historical USDA-ARS experimental watersheds near Riesel, TX. In both watersheds the major water quality concerns are excessive nutrient and bacteria concentrations ...

  19. Goodwater Creek Watershed, Missouri: National Institute of Food and Agriculture–Conservation Effects Assessment Project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Goodwater Creek NIFA-CEAP project was designed to assess water quality benefits from conservation practices implemented at the field level and develop a watershed management plan that addresses current pesticide, nutrient and sediment issues. This chapter describes and summarizes the findings fo...

  20. A Special Education Management System: ESEA Title III, Project No. 1328. Final Project Report.

    ERIC Educational Resources Information Center

    Santa Cruz County Superintendent of Schools, CA.

    Presented is the final report on a 3-year project sponsored by the Santa Cruz County, California Office of Education to develop a pupil assessment instrument listing behavioral characteristics of physically exceptional children (K-12) and to implement a program management system to serve 1,200 mentally retarded, educationally handicapped…

  1. Ferrocyanide safety project ferrocyanide aging studies. Final report

    SciTech Connect

    Lilga, M.A.; Hallen, R.T.; Alderson, E.V.

    1996-06-01

    This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200{degrees}C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990.

  2. Multi-cooperation of Cultural Heritage Conservation: The Cangdong Project of Guangdong Province

    NASA Astrophysics Data System (ADS)

    Tan, J.

    2015-09-01

    In recent years, some workshops and research cases have arisen in China to seek for suitable ways for heritage conservation and development of historic villages. However, the issue of multi-cooperation has not been much mentioned in research works. The case of Cangdong Project in Guangdong Province is a social enterprise. It is a center focusing on heritage education. It organizes tailor-made workshops for interested people from all over China and Hong Kong, Macao and overseas, including university courses for credits, summer/winter camps for primary and middle school students, as well as common people who are interested in heritage conservation. The purpose of the education center is to enhance heritage/cultural interest of the younger generations and common people, and try to work with local villagers to build a wealthy community. Nowadays, more and more villagers moved out for work and the countryside population in China is decreasing, this project also aims to create work opportunities for villagers through heritage conservation projects, so that the villagers can be willing to stay. The project focuses more in a sustainable way for community development. It has been five years since the project was set up in Cangdong Village. The project team worked with villagers, city people, students, scholars, different levels of local governments, investors, Medias, charitable organizations, as well as the market of tourism. As such, a platform of multi-cooperation for the above parties has formed during the past five years. This paper takes the Project experience from 2010-2015 as the case to study multi-cooperation in the field of heritage conservation in China, as well as to discuss how to co-operate the subjective initiatives of different stokeholds.

  3. Final Report Sustained Spheromak Physics Project FY 1997 - FY 1999

    SciTech Connect

    Hooper, E.B.; Hill, D.N.

    2000-02-29

    This is the final report on the LDRD SI-funded Sustained Spheromak Physics Project for the years FY1997-FY1999, during which the SSPX spheromak was designed, built, and commissioned for operation at LLNL. The specific LDRD project covered in this report concerns the development, installation, and operation of specialized hardware and diagnostics for use on the SSPX facility in order to study energy confinement in a sustained spheromak plasma configuration. The USDOE Office of Fusion Energy Science funded the construction and routine operation of the SSPX facility. The main distinctive feature of the spheromak is that currents in the plasma itself produce the confining toroidal magnetic field, rather than external coils, which necessarily thread the vacuum vessel. There main objective of the Sustained Spheromak Physics Project was to test whether sufficient energy confinement could be maintained in a spheromak plasma sustained by DC helicity injection. Achieving central electron temperatures of several hundred eV would indicate this. In addition, we set out to determine how the energy confinement scales with T{sub c} and to relate the confinement time to the level of internal magnetic turbulence. Energy confinement and its scaling are the central technical issues for the spheromak as a fusion reactor concept. Pending the outcome of energy confinement studies now under way, the spheromak could be the basis for an attractive fusion reactor because of its compact size, simply-connected magnetic geometry, and potential for steady-state current drive.

  4. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  5. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  6. Energy conserving site design: Greenbrier case study, Chesapeake, Virginia. Final report

    SciTech Connect

    Not Available

    1980-04-01

    A specific case study of project planning for energy conservation for a major planned unit development at the 3000-acre Greenbrier development site in Chesapeake, Virginia, is summarized. The research suggests that very considerable reductions in energy conservation can be achieved within the confines of private-sector land development and residential construction with increased incremental costs of $200.00 to $3150.00 per dwelling unit. It is hypothesized that energy consumption at Greenbrier can be reduced by one-half with an average annual savings of 21,275 kWh per residential unit, using state-of-the-art technology with careful planning and control. This represents an annual savings $750.00 per unit at the current utility rate of 3.5 cents per kWh. These savings can be achieved through reduction in heating and cooling loads and application of more-efficient heating and cooling of the remaining loads. The reduction in loads are achieved by redesign of the land plan to include a higher percentage of south-facing lots, use of vegetation to modify microclimate, decreases in air infiltration, the use of 2 x 6 framing, better insulation, and the use of an insulated slab-on-grade foundation. Further energy savings can be expected by increased efficiencies in mechanical systems used for space heating and cooling and domestic hot water. When applied to the single-family portion of Greenbrier, containing 541 dwelling units, these options reduce the total end-use energy consumption 54.7%. This reduction represents an annual savings of $432,800.00 for an initial capital investment of $1.7 million.

  7. 78 FR 16287 - Great Lakes Islands Refuges, MI and WI; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... Federal Register (73 FR 76677) on December 17, 2008. The Great Lakes Islands Refuges are comprised of... and EA to the public, announcing and requesting comments in a notice of availability (77 FR 51552) on... Fish and Wildlife Service Great Lakes Islands Refuges, MI and WI; Final Comprehensive Conservation...

  8. 78 FR 3025 - St. Vincent National Wildlife Refuge, FL; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... Fish and Wildlife Service St. Vincent National Wildlife Refuge, FL; Final Comprehensive Conservation Plan and Finding of No Significant Impact for the Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the Fish and Wildlife Service...

  9. Umatilla Satellite and Release Sites Project : Final Conceptual Design Report.

    SciTech Connect

    Montgomery, James M.

    1992-03-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  10. Umatilla Satellite and Release Sites Project : Final Siting Report.

    SciTech Connect

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  11. Final Report - Conservation & Renewable Energy Potential Study For Smith River Rancheria

    SciTech Connect

    Greg Retzlaff

    2007-07-01

    In January 2006 the Smith River Rancheria (SRR), located in Smith River, California, contracted with the team of Strategic Energy Solutions (SES) and Evergreen NRG to conduct a study for the community. The objective of the study was to identify renewable generation opportunities that would facilitate Rancheria energy independence through SRR owned and operated power projects. These generation facilities were to be located either on or near the reservation. Specifically, the Rancheria was interested in the viability of generating electric power using biomass and wind fuel resources. Initial research identified that a very small portion of the community's energy could be offset by renewable energy generation due to the low solar resource in this area, and the lack of significant wind or biomass resources on or near reservation land. Some larger projects were identified which offered little or no benefit to the Rancheria. As a result, the scope of this study was changed in October 2006 to focus on energy efficiency opportunities for key reservation facilities, with a continued analysis of smaller renewable energy opportunities within reservation boundaries. The consulting team initially performed a resource analysis for biomass and solar generation opportunities in the region of the Rancheria. It was quickly concluded that none of these options would yield renewable power for the Rancheria at costs competitive with current utility sources, and that any larger installations would require substantial funding that may not be available. Having made these conclusions early on, the study effort was redirected and the team investigated each of the major Rancheria buildings to look for solar, wind and conservation opportunities. The buildings were audited for energy use and the roof areas were examined for exposure of solar radiation. Wind resources were also investigated to determine if smaller wind turbines would offer power generation at a reasonable cost.

  12. Industrial energy conservation-center-pivot site specific irrigation. Final report, January 1995--December 1996

    SciTech Connect

    McCann, I.R.; King, B.A.; Brady, R.

    1996-12-27

    This project was to aid in the development and commercial transfer of site specific technology to industry and farmers. This report contains the results of data collected during the fall of 1996 on a site near Aberdeen, Idaho. This site was equipped to apply water at variable rates predetermined by a digital control map that resided in a computer controller. The flow rates were then adjusted to maintain desired pressure with an Adjustable Speed Drive. Energy consumption was monitored during implementation of site specific irrigation practices and normal irrigation practices. This final report covers the impact that site specific irrigation has on energy use on a irrigated small grain crop near Aberdeen, Idaho. 3 refs., 20 figs., 1 tab.

  13. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    SciTech Connect

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  14. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    SciTech Connect

    Agol, Dorice; Latawiec, Agnieszka E.; Strassburg, Bernardo B.N.

    2014-09-15

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  15. Conservation and restoration of indigenous plants to improve community livelihoods: the Useful Plants Project

    NASA Astrophysics Data System (ADS)

    Ulian, Tiziana; Sacandé, Moctar; Mattana, Efisio

    2014-05-01

    Kew's Millennium Seed Bank partnership (MSBP) is one of the largest ex situ plant conservation initiatives, which is focused on saving plants in and from regions most at risk, particularly in drylands. Seeds are collected and stored in seed banks in the country of origin and duplicated in the Millennium Seed Bank in the UK. The MSBP also strengthens the capacity of local communities to successfully conserve and sustainably use indigenous plants, which are important for their wellbeing. Since 2007, high quality seed collections and research information have been gathered on ca. 700 useful indigenous plant species that were selected by communities in Botswana, Kenya, Mali, Mexico and South Africa through Project MGU - The Useful Plants Project. These communities range from various farmer's groups and organisations to traditional healers, organic cotton/crop producers and primary schools. The information on seed conservation and plant propagation was used to train communities and to propagate ca. 200 species that were then planted in local gardens, and as species reintroduced for reforestation programmes and enriching village forests. Experimental plots have also been established to further investigate the field performance (plant survival and growth rate) of indigenous species, using low cost procedures. In addition, the activities support revenue generation for local communities directly through the sustainable use of plant products or indirectly through wider environmental and cultural services. This project has confirmed the potential of biodiversity conservation to improve food security and human health, enhance community livelihoods and strengthen the resilience of land and people to the changing climate. This approach of using indigenous species and having local communities play a central role from the selection of species to their planting and establishment, supported by complementary research, may represent a model for other regions of the world, where

  16. Final Status Survey for the Largest Decommissioning Project on Earth

    SciTech Connect

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-07-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million pounds (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System (SIMS

  17. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  18. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Construction Project in the State of Washington. Those actions grant approval for the project. DATES: By this... Construction Project. The project includes constructing pontoons sufficient to replace the existing traffic... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Project in...

  19. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    SciTech Connect

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  20. NTRCI Legacy Engine Research and Development Project Final Technical Report

    SciTech Connect

    Smith-Holbert, Connie; Petrolino, Joseph; Watkins, Bart; Irick, David

    2011-12-31

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was

  1. Final-Year Projects as a Major Element in the IE Curriculum

    ERIC Educational Resources Information Center

    Vitner, G.; Rozenes, S.

    2009-01-01

    This paper presents a multi-perspective view of the final-year project of an industrial engineering and management (IEM) department. The final year project is a major element of a 4-year curriculum within any engineering discipline. Such a project gives the student an opportunity to use and implement methods, techniques and tools that he or she…

  2. An Evaluation of the Institutional Conservation Program: Results of On-Site Analyses. Final Report.

    ERIC Educational Resources Information Center

    Synectics Group, Inc., Washington, DC.

    The Institutional Conservation Program (ICP) is a voluntary grant program designed to help such non-profit institutions as schools, hospitals, local governments, and public care facilities save energy and reduce anticipated energy-related costs. Another primary ICP goal is to conserve oil, thereby reducing the nation's dependence on imported…

  3. Bicycle transportation for energy conservation. Final technical report Jun 79-May 80

    SciTech Connect

    Moran, K.

    1980-05-01

    The study was mandated by Section 682 of the National Energy Conservation Policy Act of 1978. The study's objectives were to: (1) identify the obstacles to increased bicycle use; (2) develop a Comprehensive Bicycle Transportation Program (CBTP) to overcome these obstacles; (3) establish a target goal for bicycle commuting; and (4) determine the energy conservation of potential bicycle transportation.

  4. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  5. Stakeholder management for conservation projects: a case study of Ream National Park, Cambodia.

    PubMed

    De Lopez, T T

    2001-07-01

    The paper gives an account of the development and implementation of a stakeholder management framework at Ream National Park, Cambodia. Firstly, the concept of stakeholder is reviewed in management and in conservation literatures. Secondly, the context in which the stakeholder framework was implemented is described. Thirdly, a five-step methodological framework is suggested: (1) stakeholder analysis, (2) stakeholder mapping, (3) development of generic strategies and workplan, (4) presentation of the workplan to stakeholders, and (5) implementation of the workplan. This framework classifies stakeholders according to their level of influence on the project and their potential for the conservation of natural resources. In a situation characterized by conflicting claims on natural resources, park authorities were able to successfully develop specific strategies for the management of stakeholders. The conclusion discusses the implications of the Ream experience and the generalization of the framework to other protected areas. PMID:11437000

  6. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    SciTech Connect

    Not Available

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

  7. Pre-Vocational Occupation Education Project: End of Budget Period Report and Final Project Report; ESEA Title III.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Office of Program Planning and Development.

    The end of budget period and final project report describes a California project intended to promote the adoption or adaptation of a prevocational education program for secondary level educable mentally handicapped (EMH) students. Data are presented on staff development, the nature and results of the project's dissemination and demonstration…

  8. 77 FR 45653 - Yakima River Basin Conservation Advisory Group; Yakima River Basin Water Enhancement Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... Bureau of Reclamation Yakima River Basin Conservation Advisory Group; Yakima River Basin Water... on the structure, implementation, and oversight of the Yakima River Basin Water Conservation Program... of the Water Conservation Program, including the applicable water conservation guidelines of...

  9. Energy Efficiency and Conservation Block Grant (EECBG)- Better Buildings Neighborhood Program Final Report

    SciTech Connect

    Brown, Donisha; Harris, Barbara; Blue, Cynthia; Gaskins, Charla

    2014-09-16

    The original BetterBuildings for Greensboro grant program included an outreach campaign to inform 100% of the Greensboro community about the benefits of reducing energy use; a plan to reduce energy consumption in at least 34% of the homes and 10% of the other buildings in the east Greensboro target area; and a plan to create and retain jobs in the energy conservation industry. Under the original program structure the City of Greensboro planned to partner with local and regional lenders to create a diversified portfolio of loan products to meet the needs of various income levels and building types. All participants would participate in the loan programs as a method of meeting the program’s 5 to1 private capital match/leverage requirements. In June 2011 the program was restructured to include partnerships with large commercial and multifamily projects, with these partners providing the greater portion of the required match/leverage. The geographic focus was revised to include reducing energy consumption across the entire City of Greensboro, targeting neighborhoods with high concentrations of low-moderate income households and aged housing stock. The community outreach component used a neighborhood-based approach to train community residents and volunteers to conduct door-to-door neighborhood sweeps; delivered high quality information on available program resources; helped residents to evaluate alternative energy efficiency measures and alternative financing sources; assisted with contractor selections and monitoring/evaluation of work; coordinated activities with BetterBuildings program partners; and collected data required by the Department of Energy. Additionally, HERO (Home Energy Response Officers) delivered intro packages (energy efficiency information and products) to thousands of households at the initial point of contact. A pilot program (Early Adopters) was offered from March 1, 2011 through June 30, 2011. The Early Adopters program was designed to offer

  10. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  11. The Workplace Literacy System Project (WLS). Final Performance Report.

    ERIC Educational Resources Information Center

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  12. Project HEED. Final Evaluation Report, 1974-1975.

    ERIC Educational Resources Information Center

    Edington, Everett D.; Pettibone, Timothy J.

    Project HEED's (Heed Ethnic Education Deplorization) main emphasis in 1974-75 was to develop reading and cultural awareness skills for kindergarten through 4th grades in the 7 project schools on American Indian reservations in Arizona. In its 4th year of operation, the project (funded under Elementary and Secondary Education Title III) involved…

  13. Communication and Recruitment Project. Phase I, Final Report.

    ERIC Educational Resources Information Center

    Compton Community Coll., CA.

    Funded under the Vocational Education Amendments of 1968, this project was conceived to provide occupational counseling on an individual basis in the prospective student's home. The project is planned as a 3-phase, 3-year project. The objectives of Phase I were to develop a unique, individualized approach to the recruitment of students, and to…

  14. Project Avanse. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Greene, Judy

    Project Avanse was an Elementary and Secondary Education Act Title VII-funded project in its first year of operation at an intermediate school and a high school in Brooklyn (New York). The project served 266 Haitian-speaking students. Participating students received instruction in English as a Second Language (ESL), native language arts (NLA), and…

  15. Project Pride. Final Evaluation Report 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Cantalupo, Denise

    Project PRIDE was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation at Erasmus Hall High School in Brooklyn (New York). In the 1992-93 school year, the project served 251 students of limited English proficiency. Participating students received instruction in English as a second language (ESL),…

  16. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  17. Encoal mild coal gasification project: Encoal project final report, July 1, 1997--July 31, 1997

    SciTech Connect

    1997-07-01

    This document is the summative report on the ENCOAL Mild Coal Gasification Project. It covers the time period from September 17, 1990, the approval date of the Cooperative Agreement between ENCOAL and the US Department of Energy (DOE), to July 17, 1997, the formal end of DOE participation in the Project. The Cooperative Agreement was the result of an application by ENCOAL to the DOE soliciting joint funding under Round III of the Clean Coal Technology Program. By June 1992, the ENCOAL Plant had been built, commissioned and started up, and in October 1994, ENCOAL was granted a two-year extension, carrying the project through to September 17, 1996. No-cost extensions have moved the Cooperative Agreement end date to July 17, 1997 to allow for completion of final reporting requirements. At its inception, ENCOAL was a subsidiary of Shell Mining Company. In November 1992, Shell Mining Company changed ownership, becoming a subsidiary of Zeigler Coal Holding Company (Zeigler) of Fairview Heights, Illinois. Renamed successively as SMC Mining Company and then Bluegrass Coal Development Company, it remained the parent entity for ENCOAL, which has operated a 1,000-ton/day mild coal gasification demonstration plant near Gillette, Wyoming for nearly 5 years. ENCOAL operates at the Buckskin Mine owned by Triton Coal Company (Triton), another Zeigler subsidiary.

  18. 78 FR 56729 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... Implementing Agreement; Beech Ridge Wind Power Project, Greenbrier and Nicholas Counties, West Virginia AGENCY... bat (Myotis sodalis) and Virginia big-eared bat (Corynorhinus townsendii virginianus) from construction, operation, maintenance, and decommissioning of the Beech Ridge Wind Power Project. Beech...

  19. Hospital ventilation standards and energy conservation: chemical contamination of hospital air. Final report

    SciTech Connect

    Rainer, D.; Michaelsen, G.S.

    1980-03-01

    In an era of increasing energy conservation consciousness, a critical reassessment of the validity of hospital ventilation and thermal standards is made. If current standards are found to be excessively conservative, major energy conservation measures could be undertaken by rebalancing and/or modification of current HVAC systems. To establish whether or not reducing ventilation rates would increase airborne chemical contamination to unacceptable levels, a field survey was conducted to develop an inventory and dosage estimates of hospital generated airborne chemical contaminants to which patients, staff, and visitors are exposed. The results of the study are presented. Emphasis is on patient exposure, but an examination of occupational exposure was also made. An in-depth assessment of the laboratory air environment is documented. Housekeeping products used in survey hospitals, hazardous properties of housekeeping chemicals and probable product composition are discussed in the appendices.

  20. Saudi Arabian seismic deep-refraction profiles; final project report

    USGS Publications Warehouse

    Healy, J.H.; Mooney, W.D.; Blank, H.R.; Gettings, M.E.; Kohler, W.M.; Lamson, R.J.; Leone, L.E.

    1983-01-01

    In February 1978 a seismic deep-refraction profile was recorded by the U.S. Geological Survey along a 1000-km line across the Arabian Shield in western Saudi Arabia. The line begins in Mesozoic cover rocks near Riyadh on the Arabian Platform, leads southwesterly across three major Precambrian tectonic provinces, traverses Cenozoic rocks of the coastal plain near Jizan (Tihamat-Asir), and terminates at the outer edge of the Farasan Bank in the southern Red Sea. More than 500 surveyed recording sites were occupied, including 19 in the Farasan Islands. Six shot points were used: five on land, with most charges placed below the water table in drill holes, and one at sea, with charges placed on the sea floor and detonated from a ship. Slightly more than 61 metric tons of explosives were used in 19 discrete firings. Seismic energy was recorded by 100 newly-developed portable seismic stations deployed in approximately 200 km-long arrays for each firing. Each station consisted of a standard 2-Hz vertical component geophone coupled to a self-contained analog recording instrument equipped with a magnetic-tape cassette. In this final report, we fully document the field and data-processing procedures and present the final seismogram data set as both a digital magnetic tape and as record sections for each shot point. Record sections include a normalized set of seismograms, reduced at 6 km/s, and a true-amplitude set, reduced at 8 km/s, which have been adjusted for amplifier gain, individual shot size, and distance from the shot point. Appendices give recorder station and shot information, digital data set descriptions, computer program listings, arrival times used in the interpretation, and a bibliography of reports published as a result of this project. We used two-dimensional ray-tracing techniques in the data analysis, and our interpretation is based primarily on horizontally layered models. The Arabian Shield is composed, to first-order, of two layers, each about 20 km

  1. The Wichita Valley irrigation project: Joseph Kemp, boosterism, and conservation in northwest Texas, 1886-1939.

    PubMed

    Anderson, Jahue

    2011-01-01

    This is the story of failure: in this case, an irrigation project that never met its boosters' expectations. Between 1880 and 1930, Wichita Falls entrepreneur Joseph Kemp dreamed of an agrarian Eden on the Texas rolling plains. Kemp promoted reclamation and conservation and envisioned the Big Wichita River Valley as the "Irrigated Valley." But the process of bringing dams and irrigation ditches to the Big Wichita River ignored knowledge of the river and local environment, which ultimately was key to making these complex systems work. The boosters faced serious ecological limitations and political obstacles in their efforts to conquer water, accomplishing only parts of the grandiose vision. Ultimately, salty waters and poor drainage doomed the project. While the livestock industry survived and the oil business thrived in the subsequent decades, the dream of idyllic irrigated farmsteads slowly disappeared. PMID:22180941

  2. From GCM Output to Local Hydrologic and Ecological Impacts: Integrating Climate Change Projections into Conservation Lands

    NASA Astrophysics Data System (ADS)

    Weiss, S. B.; Micheli, L.; Flint, L. E.; Flint, A. L.; Thorne, J. H.

    2014-12-01

    Assessment of climate change resilience, vulnerability, and adaptation options require downscaling of GCM outputs to local scales, and conversion of temperature and precipitation forcings into hydrologic and ecological responses. Recent work in the San Francisco Bay Area, and California demonstrate a practical approach to this process. First, climate futures (GCM x Emissions Scenario) are screened using cluster analysis for seasonal precipitation and temperature, to select a tractable subset of projections that still represent the range of climate projections. Second, monthly climate projections are downscaled to 270m and the Basin Characterization Model (BCM) applied, to generate fine-scale recharge, runoff, actual evapotranspiration (AET), and climatic water deficit (CWD) accounting for soils, bedrock geology, topography, and local climate. Third, annual time-series are used to derive 30-year climatologies and recurrence intervals of extreme events (including multi-year droughts) at the scale of small watersheds and conservation parcels/networks. We take a "scenario-neutral" approach where thresholds are defined for system "failure," such as water supply shortfalls or drought mortality/vegetation transitions, and the time-window for hitting those thresholds is evaluated across all selected climate projections. San Francisco Bay Area examples include drought thresholds (CWD) for specific vegetation-types that identify leading/trailing edges and local refugia, evaluation of hydrologic resources (recharge and runoff) provided by conservation lands, and productivity of rangelands (AET). BCM outputs for multiple futures are becoming available to resource managers through on-line data extraction tools. This approach has wide applicability to numerous resource management issues.

  3. Licensing plan for UMTRA project disposal sites. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC`s acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information.

  4. Salton Sea Scientific Drilling Project Archival Reference, Final Draft

    SciTech Connect

    1991-03-13

    This report provides an archival reference to the scientific information and other pertinent documents and materials associated with the Salton Sea Scientific Drilling Project (SSDP). This archiving process ensures that valuable technical data and information obtained during the life of the project can be retrieved, organized and maintained as a historical record for future reference. This paper describes the background of the project and the process used for archiving the materials. [DJE-2005

  5. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    SciTech Connect

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  6. 75 FR 7029 - Notice of Availability of the Final Environmental Assessment for Solar Roof Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-16

    ... Geological Survey Notice of Availability of the Final Environmental Assessment for Solar Roof Project AGENCY..., the US Geological Survey (USGS) has prepared a Final Environmental Assessment for the Solar Roof... for the Solar Roof Project should immediately contact the USGS S.O. Conte Anadromous Fish...

  7. Nabisco Foods Division--"New Indy" Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Ivy Tech State Coll., Indianapolis, IN.

    This document contains a final report, evaluation, and curriculum materials from a project conducted at the RJR Nabisco plant in Indianapolis to upgrade the literacy and numeracy skills of the workers to facilitate technological changes to production lines. As the final report explains, although the goal of the project was to recruit and test 150…

  8. Time Management of Final Year Undergraduate English Projects: Supervisees' and the Supervisor's Coping Strategies.

    ERIC Educational Resources Information Center

    Ho, Belinda

    2003-01-01

    Explores how the individuality of students affects their time management strategies in doing undergraduate final year projects. Investigates how four students responded differently to the same time management advice given by the supervisor of their final year projects in two different teacher education programs on teaching English as a Second…

  9. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    SciTech Connect

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  10. Forrest County, MS Geothermal Project--Final Report

    SciTech Connect

    Proctor, Corey

    2014-03-13

    The Forrest County Geothermal Energy Project consists of replacing the existing air cooled chiller with geothermal water to water chillers for energy savings at the Forrest County Multi-Purpose Center. The project will also replace DX/gas rooftop and DX split system heat pump equipment with geothermal units for the Forrest County Jail. Each of the aforementioned projects consists of approximately 400 tons of cooling. The project also includes between 600 and 800 geothermal closed-loop wells. Building controls will be updated as well on both sites.

  11. Integrating Science and Land Management for the Conservation Effects Assessment Project (CEAP) in Southwestern Rangelands

    NASA Astrophysics Data System (ADS)

    Goodrich, D. C.; Heilman, P.; Nearing, M.; Speath, K.; Hernandez, M.; Wei, H.; Holifield-Collins, C.; Kautz, M.; Nichols, M.; Barlow, J.; Guertin, P.; Burns, S.; Stone, J. J.; Weltz, M.; Metz, L.; Norfleet, L.; Duriancik, L.; Johnson, M.

    2013-12-01

    Farm Bill legislation enacted by Congress in 2002 directed the U.S. Department of Agriculture to assess of the benefits and efficacy of conservation practices provided by a variety of USDA programs. Benefits include improved agricultural production, reduction of erosion and associated nutrient losses, improved water quality, improved soil resilience, and improved habitat among others. To conduct the assessment, the USDA initiated CEAP or the Conservation Effects Assessment Project in 2003, which included a national assessment complemented by small watershed studies. The national assessment started in eastern and midwestern cultivated croplands and has now progressed to western rangelands. This presentation will discuss the challenges of assessing the effects of rangeland conservation practices in a period of unusually hot and dry climatic conditions in the Cienega Creek Watershed (CCW) located southeast of Tucson, Arizona. As is common in the western U.S., the CCW consists of a patchwork of private and public lands in the west with much of the public lands leased for grazing cattle. The watershed also has high recreational value and provides many ecosystem services, including wildlife habitat qualities and flood protection to Tucson. A combination of monitoring, modeling, and remote sensing was utilized in the assessment. Conservation spending in the watershed ramped up in 1997. However, the 16-year period from 1997-2012 contains almost half of the 23 driest seasons (lowest 20 percentile) from the 117-year observed precipitation record. Initial results indicate that Landsat remotely sensed images can be effectively used to estimate both green and senescent canopy cover. This enabled detection of the impacts of drought and changes in canopy cover from practices such as prescribed fire and mechanical brush removal. Cienega Creek Watershed - Land Ownership

  12. Programmed Instruction Manual for a New Solar and Energy Conservation Laboratory. Final Evaluation Report.

    ERIC Educational Resources Information Center

    State Univ. of New York, Farmingdale. Agricultural and Technical Coll.

    A programmed instruction course was developed, consisting of fifteen experiments encompassing eleven separate pieces of equipment operational in a solar and energy conservation lab. The programmed instruction manual for the lab was evaluated and revised during a workshop. This evaluation indicated that both the lab and manual are valuable tools…

  13. Pataha Creek Model Watershed : January 2000-December 2002 Habitat Conservation Projects.

    SciTech Connect

    Bartels, Duane G.

    2003-04-01

    The projects outlined in detail on the attached project reports were implemented from calendar year 2000 through 2002 in the Pataha Creek Watershed. The Pataha Creek Watershed was selected in 1993, along with the Tucannon and Asotin Creeks, as model watersheds by NPPC. In previous years, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and were the main focus of the implementation phase of the watershed plan. These practices were the main focus of the watershed plan to reduce the majority of the sediment entering the stream. Prior to 2000, several bank stabilization projects were installed but the installation costs became prohibitive and these types of projects were reduced in numbers over the following years. The years 2000 through 2002 were years where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek. Over 95% of the sediment entering the stream can be tied directly to the upland and riparian areas of the watershed. The Pataha Creek has steelhead in the upper reaches and native and planted rainbow trout in the mid to upper portion. Suckers, pikeminow and shiners inhabit the lower portion because of the higher water temperatures and lack of vegetation. The improvement of riparian habitat will improve habitat for the desired fish species. The lower portion of the Pataha Creek could eventually develop into spawning and rearing habitat for chinook salmon if some migration barriers are removed and habitat is restored. The upland projects completed during 2000 through 2002 were practices that reduce erosion from the cropland. Three-year continuous no-till projects were finishing up and the monitoring of this particular practice is ongoing. Its direct impact on soil erosion along with the economical aspects is being studied. Other practices such as terrace, waterway, sediment

  14. Multiple Intelligences: Curriculum and Assessment Project. Final Report

    ERIC Educational Resources Information Center

    Hyland, Aine, Ed.

    2011-01-01

    The "Multiple Intelligences, Curriculum and Assessment Project" at University College Cork was a collaborative project carried out between 1995 and 1999. The key research question focused on whether Howard Gardner's theory of Multiple Intelligences could be applied to, and enhance, aspects of curriculum and assessment at primary and second level…

  15. Computer Lessons for Written Harmony. Final Project Report.

    ERIC Educational Resources Information Center

    Arenson, Michael A.

    This project was created to help music students in their development of part-writing and harmonization skills, requirements for college-level music study. It was developed and programmed by members of the Instructional Technology Center and Department of Music at the University of Delaware. The software developed during this project provides…

  16. Project for Faculty Development Program Evaluation: Final Report.

    ERIC Educational Resources Information Center

    Blackburn, Robert T.; And Others

    The project of faculty development program evaluation, developed by the Center for the Study of Higher Education of the University of Michigan, is described. Project thrusts were: to develop assessment instruments for judging the success of faculty development programs; to provide formative and summative evaluation for the programs of the 24…

  17. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  18. Kentucky Nursing Education Project: Final Report and Recommendations.

    ERIC Educational Resources Information Center

    Kentucky State Council on Higher Education, Frankfort.

    The process, activities, and outcomes of a plan for the development, implementation, and evaluation of a statewide coordinated system for nursing education in Kentucky are described. The background and objectives of the 5-year Kentucky Nursing Education Project are discussed, along with the following project components: organizational base,…

  19. Manufacturing Technology Continuation Project--FY 92. Final Report.

    ERIC Educational Resources Information Center

    Chicago City Colleges, IL. Richard J. Daley Coll.

    A project to identify metalworking subsectors (multiple spindle screw machining and gears machining) for inclusion in the Manufacturing Technology Preparation Program is the subject of this report. The project accomplished the following: developed five courses in multiple spindle, secured large donations of equipment and tooling, established a…

  20. Faces of Change Series. Documentary Film Project: Final Report.

    ERIC Educational Resources Information Center

    Miller, Norman N.

    The objectives of the Educational Materials Project were to produce print materials to accompany "The Faces of Change," a series of 26 films and some 60 essays and instructional documents produced for college classes between 1972 and 1975. The scope of the project covered two film production grants, a grant for archiving uncut footage at the…

  1. Tech Prep Intergenerational Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock.

    A project was conducted at Texas Tech University to develop a competency-based curriculum to support statewide implementation of tech prep intergenerational programs (careers in providing services to well elderly persons and to children). Project activities included the following: (1) revision and expansion of the Intergenerational Target…

  2. Skill Standards and Certification Project. Final Detailed Report. Year Two.

    ERIC Educational Resources Information Center

    North Lake Coll., Irving, TX.

    This document reports on the second year of a project conducted to design a seamless training application model for infusing workplace skills into academic and occupational programs at the secondary, postsecondary, and apprenticeship level using the components of SCANS (Secretary's Commission on Achieving Necessary Skills). For this pilot project,…

  3. Project GROW [Green River Opportunities for Work]: Final Report.

    ERIC Educational Resources Information Center

    Vikers, Theo; Gibson, Melvin Pat

    Summarizing the progress of Project Green River Opportunities for Work (Project GROW), the document reviews the study's background and the activities resulting from a third party evaluation by the Southern Association of Colleges and Schools. Objectives based on the evaluation and recommendations included: (1) development of an articulated and…

  4. Project HEED, Title III, Section 306. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    Project HEED (Heed Ethnic Educational Depolarization) involves over 1,000 Indian children in grades 1-8 in Arizona. The project target sites are 48 classrooms at Sells, Topowa, San Carlos, Many Farms, Hotevilla, Peach Springs, and Sacaton. Objectives are to increase: (1) reading achievement, (2) affective behavior of teachers, (3) motivation by…

  5. Project HEED. Final Evaluation Report, 1973-74.

    ERIC Educational Resources Information Center

    Edington, Everett D.; Pettibone, Timothy

    1973-74 approximately 1,100 Indian students in grades 1 through 8 participated in Project HEED (Heed Ethnic Educational Depolarization) in Arizona. The project target sites were 59 classrooms at Sacaton, Sells, Peach Springs, San Carlos, Topowa, Many Farms, St. Charles Mission, and Hoteville. Primary objectives were: (1) improvement in reading…

  6. Eldercare Volunteer Corps Demonstration, A "Project Care" Initiative. Final Report.

    ERIC Educational Resources Information Center

    Kentucky State Dept. for Social Services, Frankfort.

    The goal for this project was to recognize the volunteers at the beginning of the project and to focus on a program to increase the utilization of volunteers in essential service delivery to at-risk persons in the Big Sandy region of eastern Kentucky. A diverse committee made up of business, education, civil leaders, service providers, and…

  7. Competency-Based Adult Vocational Education Project. Final Report.

    ERIC Educational Resources Information Center

    Auburn Univ., AL. Dept. of Vocational and Adult Education.

    This applied project recognized the priority to identify, describe, and evaluate existing vocational education programs that are coordinated with the adult performance level (APL) competency based approach. Furthermore, the project supported the value of developing and testing one or more models for APL/vocational education interface. In order to…

  8. Comprehensive Science Evaluation Project: Hudson County Community College. Final Report.

    ERIC Educational Resources Information Center

    Oromaner, Mark

    A summary is provided of the goals, objectives, activities, and findings of Hudson County Community College's (HCCC's) comprehensive science evaluation project. After introductory material outlines the status of science education at HCCC, the project's objectives are presented; i.e., to analyze the college's science courses and their ability to…

  9. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  10. Honey Lake Geothermal Project, Lassen County, California. Final technical report

    SciTech Connect

    Not Available

    1984-11-01

    This report discusses the drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel. The project is located within the Wendel-Amedee Known Geothermal Resource Area. (ACR)

  11. NGA/ACT Pilot Project: Increasing Course Rigor. Final Report

    ERIC Educational Resources Information Center

    ACT, Inc., 2008

    2008-01-01

    The Increasing Course Rigor Pilot Project, a joint initiative of the National Governors Association (NGA) Center for Best Practices and ACT, Inc., is one component of Phase Two of the NGA Center for Best Practices Honor States Grant Program. The project, which began in winter 2006 and concluded in summer 2007, was designed to improve the quality…

  12. Rural Workplace Literacy Demonstration Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    In April 1991, Enterprise State Junior College and MacArthur State Technical College established a rural workplace literacy demonstration project in partnership with adult basic education, seven employers, and a labor organization. The project served 615 persons in classes offered at the 2 colleges, 4 partner locations, and 3 additional worksites.…

  13. The Ninos Especiales Outreach Training Project (NEOTP). Final Report.

    ERIC Educational Resources Information Center

    Bruder, Mary Beth; And Others

    The Ninos Especiales Outreach Training Project was a 3-year federally funded project to provide information, training, and evaluation related to a culturally sensitive, family-focused model of early intervention services for infants with severe disabilities and their families of Puerto Rican heritage. Implementation occurred through three major…

  14. Look into the Future: Displaced Clerical Project. Final Report.

    ERIC Educational Resources Information Center

    Stover, Deborah A.

    "Look into the Future" is a program created by a Job Training Partnership Act project and 9to5, Working Women Education Fund, to address the training and retraining needs of office workers in light of the advances in computer and communications systems. This guide describes the model project and suggests steps other organizations can take to…

  15. Automobile Mechanic Training Evaluation Project (AMTEP) Final Report.

    ERIC Educational Resources Information Center

    Losh, Charles

    A project was undertaken to identify, develop, and validate those performance, program, and personal standards judged necessary to operate and evaluate a quality automobile mechanic/technician training program. Included among the project activities were the following: (1) a review of existing literature on performance and program standards; (2)…

  16. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  17. Project Open-Out: Adult Basic Education: Final Report.

    ERIC Educational Resources Information Center

    Brooks, Elva M.

    A project in adult basic education was established in the Model Neighborhood of Wilmington, Delaware. A delivery system of services using paraprofessionals was created to give eligible adults individualized instruction in their home or a nearby center. The results showed that most of the project enrollment and performance objectives were met. Data…

  18. Bilingual Education Project, Santa Clara County, California. Final Report, 1972.

    ERIC Educational Resources Information Center

    Santa Clara County Office of Education, San Jose, CA.

    The Spanish Dame Bilingual Education Project, located in Santa Clara County, California, served 190 children who came from homes where the primary language was Spanish and who resided within the target area schools of the Alum Rock School District. The objectives of the preschool project were (1) to demonstrate a home-teaching procedure designed…

  19. Project Closeout: Guidance for Final Evaluation of Building America Communities

    SciTech Connect

    Norton, P.; Burch, J.; Hendron, B.

    2008-03-01

    This report presents guidelines for Project Closeout. It is used to determine whether the Building America program is successfully facilitating improved design and practices to achieve energy savings goals in production homes. Its objective is to use energy simulations, targeted utility bill analysis, and feedback from project stakeholders to evaluate the performance of occupied BA communities.

  20. Incentives in Education Project, Impact Evaluation Report. Final Report.

    ERIC Educational Resources Information Center

    Planar Corp., Washington, DC.

    This report describes results of a demonstration project carried out in four cities during 1971-72. The project aimed at exploring the feasibility and impact of two different forms of money incentives payments. In one form -- the "Teacher-Only" model -- the teachers in a school were offered a series of bonuses ranging from $150 to $600 per class…

  1. Project Aprendizaje. Final Evaluation Report 1992-93.

    ERIC Educational Resources Information Center

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  2. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    SciTech Connect

    Fellhauer, C.R.; Clark, F.R.; Garlock, G.A.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project.

  3. Give Water a Hand. Community Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation within a community, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  4. Give Water a Hand. School Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation at a school site, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  5. Give Water a Hand. Home Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water and water conservation within the home while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  6. RCRA (Resource Conservation and Recovery Act) ground-water monitoring projects for Hanford facilities: Annual Progress Report for 1989

    SciTech Connect

    Smith, R.M.; Gorst, W.R.

    1990-03-01

    This report describes the progress during 1989 of 16 Hanford Site ground-water monitoring projects covering 25 hazardous waste facilities and 1 nonhazardous waste facility. Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act of 1976 and the State of Washington Administrative Code. 40 refs., 75 figs., 6 tabs.

  7. Final Report: Weatherization and Energy Conservation Education and Home Energy and Safety Review in the Aleutian Islands

    SciTech Connect

    Bruce Wright

    2011-08-30

    Aleutian/Pribilof Islands Association, Inc. (APIA) hired three part-time local community members that desire to be Energy Technicians. The energy technicians were trained in methods of weatherization assistance, energy conservation and home safety. They developed a listing of homes in the region that required weatherization, and conducted on-site weatherization and energy conservation education and a home energy and safety reviews in the communities of Akutan, False Pass, King Cove and Nelson Lagoon. Priority was given to these smaller communities as they tend to have the residences most in need of weatherization and energy conservation measures. Local residents were trained to provide all three aspects of the project: weatherization, energy conservation education and a home energy and safety review. If the total energy saved by installing these products is a 25% reduction (electrical and heating, both of which are usually produced by combustion of diesel fuel), and the average Alaska home produces 32,000 pounds of CO2 each year, so we have saved about: 66 homes x 16 tons of CO2 each year x .25 = 264 tons of CO2 each year.

  8. Conservation Effects Assessment Project (CEAP) Watershed Assessment Studies: Advancing the Science for Conservation Assessment at Watershed Scale

    Technology Transfer Automated Retrieval System (TEKTRAN)

    CEAP Watershed Assessment Studies were initiated in 2004 or later to measure the environmental effects of conservation practices on water resources (quality and availability), soil quality, or fish and wildlife habitat at the watershed scale. Over 40 CEAP Watershed Studies have now been sponsored co...

  9. BMDO: New Mexico Technology Transfer Demonstration Project. Interim final report

    SciTech Connect

    Not Available

    1993-11-01

    The BMDO-New Mexico Technology Transfer Demonstration Project(BMDO-NM) was a collaborative effort among the national laboratories to identify and evaluate the commercial potential of selected SDI-funded technologies. The project was funded by BMDO (formerly known as the Strategic Defense Initiative Office or SDIO), the Technology Enterprise Division (NM-TED) of the NM Economic Development Division, and the three National Laboratories. The project was managed and supervised by SAGE Management Partners of Albuquerque, and project funding was administered through the University of New Mexico. The BMDO-NM Demonstration Project focused on the development of a process to assist technology developers in the evaluation of selected BMDO technology programs so that commercialization decisions can be made in an accelerated manner. The project brought together BMDO, the NM-TED, the University of New Mexico, and three New Mexico Federal laboratories -- Los Alamos (DOE), Phillips (DOD) and Sandia (DOE). Each national laboratory actively participated throughout the project through its technology transfer offices. New Mexico was selected as the site for the Demonstration Program because of its three national and federal research laboratories engaged in BMDO programs, and the existing relationship among state govemment, the labs, universities and local economic development and business assistance organizations. Subsequent Commercialization and Implementation phases for the selected technologies from LANL and SNL were completed by SAGE and the Project Team. Funding for those phases was provided by the individual labs as well as BMDO and NM-TED in kind services. NM-TED played a proactive role in this New Mexico partnership. Its mandate is to promote technology-based economic development, with a commitment to facilitate the use of technology by industry and business statewide. TED assumed the role of program manager and executing agent for BMDO in this demonstration project.

  10. The Development and Evaluation of Audio-Tutorial Programmed Instruction in Learning Concepts of Ecology and Conservation. Final Report.

    ERIC Educational Resources Information Center

    Presnell, Richard W.

    Presented in this final report is a description and evaluation of a one year experimental environmental education program involving 236 fifth and sixth grade students in central New York state. Primary objective of the project was the development, implementation, and evaluation of a series of audio-taped lessons, designed to teach upper elementary…

  11. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    SciTech Connect

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions favorable for a fish

  12. Austin Children`s Museum ``Go Power`` project. Final report

    SciTech Connect

    Not Available

    1993-10-01

    Go Power, was conceived as an interactive exhibit and related set of activities designed to promote in children and families an understanding and appreciation of energy concepts. Planned in 1990, the project culminated its first phase of activities with colorful, interactive exhibit about the pathways and transformations of energy, on display at the Austin Children`s Museum between February 5th and June 6th, 1993. The project was supported by the US Department of Energy, the National Science Foundation, the Lower Colorado River Authority and various local foundations and businesses. This report describes the process, product and outcomes of this project.

  13. Keweenaw Bay Indian Community Weatherization Training Project Final Report

    SciTech Connect

    Denomie, Lawrence J.; LaPointe, Bruce

    2012-03-26

    The objective of the project is to train the appropriate staff, both new and existing from various KBIC Departments in the core competencies needed to develop a comprehensive Tribal community weatherization program. The goal of the project was to build the staff capacity to enable the KBIC to establish a Tribal weatherization program that promotes energy sufficiency throughout the Tribal community. The project addresses the needs identified in the 2008 KBIC Strategic Energy Plan to build the staff capacity and increase the knowledge base within the Tribal Departments and to implement an energy efficiency program through community education and financial assistance incentives.

  14. Final Report for Project FG02-05ER25685

    SciTech Connect

    Xiaosong Ma

    2009-05-07

    In this report, the PI summarizes the results and achievements obtained in the sponsored project. Overall, the project has been very successful and produced both research results in massive data-intensive computing and data management for large scale supercomputers today, and in open-source software products. During the project period, 14 conference/journal publications, as well as two PhD students, have been produced due to exclusive or shared support from this award. In addition, the PI has recently been granted tenure from NC State University.

  15. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... project consists of a 100-turbine wind-powered electric generation facility located in an approximately 80... Wind for take of the Indiana bat, incidental to otherwise lawful activities in accordance with the HCP... Implementing Agreement and Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County,...

  16. OECD MCCI project final report, February 28, 2006.

    SciTech Connect

    Farmer, M. T.; Lomperski, S.; Kilsdonk, D. J.; Aeschlimann, R. W.; Basu, S.

    2011-05-23

    -dimensional. Although the MACE Scoping Test was carried out with a two-dimensional concrete cavity, the interaction was flooded soon after ablation was initiated to investigate debris coolability. Moreover, due to the scoping nature of this test, the apparatus was minimally instrumented and therefore the results are of limited value from the code validation viewpoint. Aside from the MACE program, the COTELS test series also investigated 2-D CCI under flooded cavity conditions. However, the input power density for these tests was quite high relative to the prototypic case. Finally, the BETA test series provided valuable data on 2-D core concrete interaction under dry cavity conditions, but these tests focused on investigating the interaction of the metallic (steel) phase with concrete. Due to these limitations, there is significant uncertainty in the partitioning of energy dissipated for the ablation of concrete in the lateral and axial directions under dry cavity conditions for the case of a core oxide melt. Accurate knowledge of this 'power split' is important in the evaluation of the consequences of an ex-vessel severe accident; e.g., lateral erosion can undermine containment structures, while axial erosion can penetrate the basemat, leading to ground contamination and/or possible containment bypass. As a result of this uncertainty, there are still substantial differences among computer codes in the prediction of 2-D cavity erosion behavior under both wet and dry cavity conditions. Thus, a second key aim of the current program was to provide the necessary data to help resolve these modeling differences. In light of the above issues, the OECD-sponsored Melt Coolability and Concrete Interaction (MCCI) program was initiated at Argonne National Laboratory. The project conducted reactor materials experiments and associated analysis to achieve the following technical objectives: (1) resolve the ex-vessel debris coolability issue through a program that focused on providing both confirmatory

  17. SOUTH FLORIDA ECOSYSTEM ASSESSMENT PROJECT: FINAL TECHNICAL REPORT - PHASE I

    EPA Science Inventory

    The South Florida Ecosystem Assessment Project is an innovative, large-scale monitoring and assessment program designed to measure current and changing conditions of ecological resources in South Florida using an integrated holistic approach. Using the United States Environmenta...

  18. Final Project Report: A Polyhedral Transformation Framework for Compiler Optimization

    SciTech Connect

    Sadayappan, Ponnuswamy; Rountev, Atanas

    2015-06-15

    The project developed the polyhedral compiler transformation module PolyOpt/Fortran in the ROSE compiler framework. PolyOpt/Fortran performs automated transformation of affine loop nests within FORTRAN programs for enhanced data locality and parallel execution. A FORTAN version of the Polybench library was also developed by the project. A third development was a dynamic analysis approach to gauge vectorization potential within loops of programs; software (DDVec) for automated instrumentation and dynamic analysis of programs was developed.

  19. Final Report - Navajo Electrification Demonstration Project - FY2004

    SciTech Connect

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  20. 78 FR 13660 - Middle Fork American River Project; Notice of Availability of the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... Energy Regulatory Commission Middle Fork American River Project; Notice of Availability of the Final Environmental Impact Statement for the Middle Fork American River Hydrolectric Project In accordance with the... Projects has reviewed the application for license for the Middle Fork American River Hydroelectric...

  1. The Indiana Deafblind Services Project: Services for Children with Deafblindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Indiana State Univ., Terre Haute. Blumberg Center for Interdisciplinary Studies in Special Education.

    This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 4-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through 2 and ages 18 through 21. The project also was designed to provide technical assistance to public and private…

  2. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  3. Project PREM: Final Report for Year I. (Preparing Regular Educators for Mainstreaming).

    ERIC Educational Resources Information Center

    Haughton, Donna D.

    The final report on Preparing Regular Educators for Mainstreaming mildly handicapped children (Project PREM) focuses on the first year's activities and outlines proposed objectives for the project's second and third years. Covered in an introductory section are Project PREM's main objective of developing and implementing a competency-based program…

  4. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  5. Newberry Geothermal Pilot Project : Final Environmental Impact Statement.

    SciTech Connect

    US Forest Service; US Bureau of Land Management; US Bonneville Power Administration

    1994-09-01

    BPA has decided to acquire 20 average megawatts (aMW) of electrical power from a privately-owned geothermal power plant on the west flank of Newberry Volcano in Deschutes County, Oregon. The Newberry Project will generate 30 aMW and will be developed, owned, and operated by CE Newberry, Inc. of Portland, Oregon. In addition, BPA has decided to grant billing credits to EWEB for 10 aMW of electrical power and to provide wheeling services to EWEB for the transmission of this power to their system. BPA expects the Newberry Project to be in commercial operation by November 1997. BPA has statutory responsibilities to supply electrical power to its utility industrial and other customers in the Pacific Northwest. The Newberry Project will be used to meet the electrical power supply obligations of these customers. The Newberry Project will also demonstrate the availability of geothermal power to meet power supply needs in the Pacific Northwest and is expected to be the first commercial geothermal plant in the region. The Newberry Project was selected under the BPA Geothermal Pilot Project Program. The goal of the Program is to initiate development of the Pacific Northwest`s large, but essentially untapped, geothermal resources, and to confirm the availability of this resource to meet the energy needs of the region. The primary underlying objective of this Program is to assure the supply of alternative sources of electrical power to help meet growing regional power demands and needs.

  6. Project on Social Architecture in Education. Final Report. Part II: Research Methods. Chapter 4: Project Overview. Chapter 5: Research Methods.

    ERIC Educational Resources Information Center

    Miles, Matthew B.

    This document contains chapters 4 and 5 of the final report of the Project on Social Architecture in Education. Chapter 4 provides a brief overview of the activities of the project in order to sketch the context out of which the case studies, conclusions, and learning materials emerged. Chapter 5 discusses and evaluates six major strands of…

  7. ASHRAE special project No. 22 Task 4. Final report

    SciTech Connect

    Coad, W J

    1980-12-30

    The recommendations for a methodology for determining Resource Impact Factors (RIF); a method for applying these factors to the current format of ASHRAE Standard 90A-77 (Section 12 of Standard 90); and other recommendations are summarized. The report also includes examples of the use of the methodology recommended, and relevant or pertinent supporting data. ASHRAE Standard 90 deals with energy conservation in new buildings. Such factors include the availability, social, economic, environmental, and national issues associated with the resource quantities of fuel and energy resources consumed.

  8. Eckerd College Energy Systems Project. Final technical report

    SciTech Connect

    DeGroot, D.E.

    1984-02-06

    The Eckerd College Energy Systems Project (ESP) consisted of four interrelated components: Organic gardening; Aquaculture (Tilapia); Methane gas conversion and utilization as energy source to drive an electric generator; Solar water heating component. These components were designed to demonstrate the feasibility of using alternative technologies to reduce petro-chemical energy dependency, to provide faculty and staff with hands-on A.T. experience, and to involve the general community in A.T. energy experiences. The Organic, Aquaculture and Solar components were successful. The Methane project was not. The educational goals of the project were met or exceeded. It is strongly recommended that DOE/AT support ESP like programs at all educational levels as part of our national commitment to developing an increasing capability for energy self sufficiency in the general population.

  9. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume II: Final Career Education Evaluation Report.

    ERIC Educational Resources Information Center

    Stenner, A. Jackson; And Others

    This document contains the second of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  10. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  11. Customer-focused planning: Demonstration project summaries. Final report

    SciTech Connect

    George, S.S.

    1992-12-01

    To succeed in the increasingly competitive and dynamic markets in which they operate, electric utilities are focusing ever greater attention on understanding and meeting customer needs. EPRI`s Customer Focused Planning (CFP) project was established to develop concepts and tools that will help utilities enhance their commitment to customer service. The project team conducted a series of interviews and meetings with participating utilities to collaboratively implement crucial steps in the CFP process. Although there is no unique set of tools or single management approach for improving product and service delivery, customer-focused companies have at least five ideals in common. They (1) define goals and objectives in concrete terms, (2) extend the planning boundaries of the organization to include all members of the energy services infrastructure, (3) painstakingly link functional activities directly to customer needs, (4) incorporate the customer`s voice in new product/ service design, and (5) align performance measures with customer needs. In addition, customer-focused companies use a variety of methods to improve customer satisfaction and company performance. These methods include conducting market research, developing market processes such as demand-side management contracting or bidding to reveal customer preferences, and involving customers more directly in the planning process. This report summarizes two brief demonstration projects conducted as part of EPRI`s CFP project, one at Commonwealth Edison Company (CECo) and one at PSI Energy. The CECo project emphasized developing customer-focused performance measures for telephone inquiries. The PSI Energy project involved a one-day workshop underscoring two important CFP elements-understanding customer wants and explicitly linking those wants to utility activities.

  12. Energy conservation in meat, poultry, and dairy processing. Final report: development of a proposed conference series

    SciTech Connect

    Not Available

    1981-07-31

    A seminar series is proposed to target seven technologies for promotion to the meat, poultry, and dairy industries. Hog skinning, continuous rendering, whole blood processing, and electrical stimulation/hot deboning were selected as the most promotable technologies within the Meat Processing Industry. In Dairy Processing, multistage drying and mechanical vapor recompression are the targeted technologies. Waste heat recovery is a generic technology. The logistics of the seminar series is presented. The activities of the meat, poultry and dairy industries in energy conservation are reported. (MHR)

  13. Final report on the LLNL compact torus acceleration project

    SciTech Connect

    Eddleman, J.; Hammer, J.; Hartman, C.; McLean, H.; Molvik, A.

    1995-03-19

    In this report, we summarize recent work at LLNL on the compact torus (CT) acceleration project. The CT accelerator is a novel technique for projecting plasmas to high velocities and reaching high energy density states. The accelerator exploits magnetic confinement in the CT to stably transport plasma over large distances and to directed kinetic energies large in comparison with the CT internal and magnetic energy. Applications range from heating and fueling magnetic fusion devices, generation of intense pulses of x-rays or neutrons for weapons effects and high energy-density fusion concepts.

  14. Final Report for NA-22/DTRA Cosmic Ray Project

    SciTech Connect

    Wurtz, Ron E.; Chapline, George F.; Glenn, Andrew M.; Nakae, Les F.; Pawelczak, Iwona A.; Sheets, Steven A.

    2015-07-21

    The primary objective of this project was to better understand the time-correlations between the muons and neutrons produced as a result of high energy primary cosmic ray particles hitting the atmosphere, and investigate whether these time correlations might be useful in connection with the detection of special nuclear materials. During the course of this project we did observe weak correlations between secondary cosmic ray muons and cosmic ray induced fast neutrons. We also observed strong correlations between tertiary neutrons produced in a Pb pile by secondary cosmic rays and minimum ionizing particles produced in association with the tertiary neutrons.

  15. Final Reclamation Report: Basalt Waste Isolation Project exploratory shaft site

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs.

  16. FY2003 LDRD Final Annual Report Article: Pathogen Pathway Project

    SciTech Connect

    Fitch, J P; McCutchen-Maloney, S L

    2003-11-10

    Understanding virulence mechanisms of bacterial pathogens is vital to anticipating biological threats and to improving detectors, vaccines, and treatments. This project will characterize factors responsible for virulence of Yersinia pestis, the causative agent of plague and a biothreat agent, which has an inducible Type III secretion virulence mechanism also found in other animal, plant, and human pathogens. Our approach relies on genomic and proteomic characterization of Y. pestis in addition to a bioinformatic infrastructure. Scientific and technical capabilities developed in this project can be applied to other microbes of interest. This work will establish a significant new direction for biodefense at LLNL and expand our national and international scientific collaborations.

  17. Phase II: Final Report. Northern New Mexico Energy Education Project.

    ERIC Educational Resources Information Center

    New Mexico Highlands Univ., Las Vegas.

    Objectives of the Northern New Mexico Energy Education Project were to: (1) improve teachers' knowledge of energy-related subject matter and energy-related educational materials; (2) develop continuing communication and cooperation between elementary and junior high staffs and the university on energy-related matters; and (3) provide follow-up…

  18. The Minneapolis Accountability Project: 1972-1976. Final Report.

    ERIC Educational Resources Information Center

    Faunce, R.W.; Walen, Tracey

    The Minneapolis Accountability Project was an effort of the Minneapolis Public Schools to provide greater accountability to the public by helping citizens evaluate school programs. Citizens' study groups were provided with staff to help them in a year-long study of a topic selected by a citizen's advisory board. Study committees met weekly…

  19. Rural Workplace Literacy Project: Northern California. Final Report.

    ERIC Educational Resources Information Center

    California Human Development Corp.

    The California Human Development Corporation's Rural Workplace Literacy Project (RWLP) provided migrant and seasonal farmworkers with on-site workplace literacy training designed to enhance their ability to develop job skills. During 1990-91, it provided literacy classes at 15 agricultural worksites and enrolled 282 farmworkers. Of students…

  20. Literacy, Welfare & Work: Longitudinal Research Project. Final Report and Recommendations.

    ERIC Educational Resources Information Center

    Smith, Janet

    The 3-year Literacy, Welfare, and Work Longitudinal Research Project explored the complex relationship between literacy and employment within the context of welfare reform in Manitoba, in an attempt to identify the barriers to education and employment that adult learners experience, as well as the policies, programs, and support services that best…

  1. The Community Service Fellowship Planning Project: Final Report.

    ERIC Educational Resources Information Center

    McKee, Robert L.; Gaffney, Michael J.

    This report describes the findings and recommendations of the Community Service Fellowship (CSF) Planning Project conducted by the American Association of Community and Junior Colleges under a grant from ACTION, the federal agency charged with promoting volunteer service. The proposed CSF program is a means of providing young people with…

  2. EVALUATION OF THE EDUCATIONAL MEDIA KIT PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    KEMP, JERROLD E.; LEWIS, RICHARD B.

    THE PURPOSE OF THIS PROJECT WAS TO PLAN, PRODUCE, EVALUATE, AND ARRANGE FOR THE DISTRIBUTION OF A KIT OF MATERIALS FOR USE IN DEMONSTRATING AVAILABLE AUDIOVISUAL MEDIA AND THEIR APPLICATIONS IN EDUCATION. FOLLOWING THE PRODUCTION OF THE KITS, QUESTIONNAIRES WERE COMPLETED BY USERS AND AUDIENCES. REACTIONS WERE FAVORABLE, AND COMMERCIAL…

  3. Vocational Placement Project. Final Report, 1981-1982.

    ERIC Educational Resources Information Center

    Ciardello, Jean A.; And Others

    The main goal of the Vocational Placement Project of the Rutgers Medical School Community Mental Health Center (New Jersey) is to investigate ways to improve vocational rehabilitation and educational programs for the chronically mentally ill. A quasi-experimental design was used to evaluate a pilot vocational rehabilitation program to determine if…

  4. AN INDEPENDENT STUDY PROJECT FOR GIFTED UNDERACHIEVERS. FINAL REPORT.

    ERIC Educational Resources Information Center

    PURKEY, WILLIAM WATSON

    THE STIMULATION OF BRIGHT UNDERACHIEVERS WAS THE GOAL OF A PROJECT CONDUCTED IN NINE FLORIDA HIGH SCHOOLS WITH A SAMPLE OF 44 EXPERIMENTAL AND 40 CONTROL GROUP STUDENTS. BRIGHT UNDERACHIEVERS WERE DEFINED AS STUDENTS WHO HAD SCORED ABOVE THE 75TH PERCENTILE ON THE SCHOOL AND COLLEGE ABILITY TEST IN THE NINTH GRADE, BUT WHOSE GRADES AVERAGED "C" OR…

  5. Understanding Equilibrium: The Study of Complex Systems. Final Project Report.

    ERIC Educational Resources Information Center

    Duckworth, Eleanor; And Others

    The Educational Technology Center (ETC) Complex Systems Project was initiated to explore ways of using computers to help students understand systems which have often proven too complex for most high school students to understand. Preliminary work concentrated on the cognitive processes involved in modeling simple systems. This paper describes an…

  6. Project P.R.O.B.E. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Price, Alda; Sperber, Diane

    This evaluation report describes Project P.R.O.B.E., a bilingual education program for four and five year old Spanish speaking children in two Bronx, New York schools. The educational objectives of the program, including the improvement of reading and other curriculum skills, are outlined. Also described are staffing patterns, orientation and…

  7. Project UPSTART. Final Report, October 1, 1983-September 30, 1984.

    ERIC Educational Resources Information Center

    Frain, Joan

    Project UPSTART, during this fourth year of outreach, offered assistance in replicating its developed Sequenced Neuro-Sensorimotor Program (SNSP) for severely multihandicapped infants, pre-schoolers, young adults and their families. Future replication sites were identified. Programs received outreach assistance in the areas of staff training,…

  8. Final Report of the Vocational Assessment Project, 1979-80.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. School of Medicine.

    To improve vocational rehabilitation programs for schizophrenic persons, a project sought to design an effective assessment strategy. Inactive records of schizophrenic clients at New Jersey sheltered workshops were examined to determine validity and reliability of assessment instruments being used. General Aptitude Test Battery (GATB) profiles of…

  9. Working Smart: The Los Angeles Workplace Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Los Angeles Unified School District, CA. Div. of Adult and Occupational Education.

    The Working Smart workplace literacy project was sponsored by a public school district and several profit and nonprofit companies and conducted for the hotel and food industry in the Los Angeles area. Literacy instruction was merged with job requirements of the customer service job classifications. Videodisc courseware was developed, as were…

  10. Parent Services Project Evaluation: Final Report of Findings.

    ERIC Educational Resources Information Center

    Stein, Alan R.; Haggard, Molly

    The Parent Services Project (PSP) is a family resource program which provides supportive activities for highly stressed and socially isolated parents based on the "social support as a stress-buffer" model of primary prevention. A PSP evaluation followed parents as they went through the PSP program and compared them with a matched control sample of…

  11. Skills Conversion Project: Chapter 7, Power Resources. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The opportunity for employment of displaced aerospace and defense professionals within the electric power utility industry was investigated by the Seattle Skills Conversion Project Team of the National Society of Professional Engineers, as part of a study conducted for the U.S. Department of Labor. The study concluded that a possibility for…

  12. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  13. Articulation for Allied Health. Final Report. Omnibus Dissemination Project.

    ERIC Educational Resources Information Center

    Havens, Cheryl C.

    There exists in health occupations education, two types of educational institutions. One type prepares students for a certificate, and the other for a degree. The objective of the Articulation Project for Allied Health was to establish and document a procedure by which students with technical certificates could receive college credit, recommending…

  14. Project VITAL. Final Financial Status and Performance Report.

    ERIC Educational Resources Information Center

    Ellison, Arthur

    In its third year of funding, Project VITAL (Volunteers In Training Act and Learn) was designed to provide literacy training to 500 librarians, coordinators, and volunteers working in literacy programs. Through the techniques of improvisational theater, structured scenarios were enacted dealing with illiteracy, women's concerns of domestic…

  15. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  16. Project Emerge, Dayton, Ohio. 1973-74 Final Evaluation Report.

    ERIC Educational Resources Information Center

    Crawford, James

    Project Emerge was initiated in reaction to a high dropout rate at Roosevelt High School, which was attributed to low self-concept, low motivation, underachievement and the internalization of failure, irregular attendance, health problems, and disruptive classroom behavior. The enrollment of Roosevelt High School is 1395 students, of whom…

  17. Utilization of Para-Professional Counselors. Final Project Report.

    ERIC Educational Resources Information Center

    Southwestern Coll., Chula Vista, CA.

    This Title III project involved the training and utilization of a paraprofessional counselor in working with a sample of first-time freshmen students at California's Southwestern College. The hypothesis was that a team consisting of a paraprofessional and professional counselor wound be more effective in counseling; the assignment of routine tasks…

  18. Foreign Language/Area Studies Enhancement Project. Final Report.

    ERIC Educational Resources Information Center

    Felker, William; Fuller, Clark

    The Foreign Language/Area Studies Enhancement Program at Central State University (Ohio) is an experience-centered work and study program in Africa designed to give students training in language, culture, and technology. It parallels and supports the university's northern Senegal water management project designed to promote self-sufficiency among…

  19. NYC Summer Pilot Project. Preliminary, Interim, and Final Reports.

    ERIC Educational Resources Information Center

    Sarthory, Joseph A.

    The Neighborhood Youth Corp projects, a pilot program funded by the Department of Labor Manpower Development and Training Act, enrolled 81 economically disadvantaged high school students in a program involving summer employment, educational and social enrichment, and familiarization with the world of work. The primary purpose of the program was to…

  20. Off-Line Computer Aided Learning Project. Final Report.

    ERIC Educational Resources Information Center

    Broderick, W. R.

    The Borough of Havering in London, England undertook a project to devise and implement a computer aided learning program which involved teachers in the production of materials and provided students with a flexible, individualized system of instruction. Materials were developed, and three trials were conducted: (1) a program and equipment test; (2)…

  1. An International Comparison of Final-Year Design Project Curricula

    ERIC Educational Resources Information Center

    Kentish, Sandra E.; Shallcross, David C.

    2006-01-01

    This paper reviews design teaching at a total of 15 chemical engineering departments across Australia, Singapore, and the United Kingdom. The emphasis is on the capstone Design Project, which can be viewed as a major transition subject for students as they move into the workplace. The study shows that this subject has evolved to act as an…

  2. Skills Conversion Project, Chapter 8, Pollution Control. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…

  3. Adult Education School-to-Work Project. Final Report.

    ERIC Educational Resources Information Center

    Gacka, Richard C.

    A project undertaken to determine the feasibility of integrating components of secondary-level tech prep and school-to-work programs into adult basic and literacy education (ABLE) programs. Applied academics curriculum materials developed by the Center for Occupational Research and Development (CORD) and the Agency for Instructional Technology…

  4. The Future of Work. Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Center for New Work of Flint, MI.

    The Future of Work project grew out of an essay of the same title by Frithjof Bergmann, a philosophy professor at the University of Michigan. In spring 1983, Professor Bergmann and a colleague, Richard Gull, founded the Center for New Work of Flint in Michigan, where the problems besieging the U.S. auto industry were focusing attention on the…

  5. [Wisconsin] Research and Development Project in Career Education: Final Report.

    ERIC Educational Resources Information Center

    Lehrmann, Eugene I.

    The K-Adult research and development project in career education in Eau Claire, Wisconsin, contained two phases: (1) Eau Claire Joint School District Five, introducing the 16 Wisconsin career development concepts into school curricula through teacher workshops, resource materials, public relations, and consulting services for classroom teachers…

  6. Driver Aid and Education Test Project. Final Report.

    ERIC Educational Resources Information Center

    Shadis, W.; Soucek, S. J.

    A driver education project tested the hypothesis that measurable improvements in fleet fuel economy can be achieved by driver awareness training in fuel-efficient driving techniques and by a manifold vacuum gauge, used individually or in combination with each other. From April 1976 through December 1977 data were collected in the Las Vegas,…

  7. Project ESL/Careers Curriculum. Final Report 1983-1984.

    ERIC Educational Resources Information Center

    Atlantic Community Coll., Mays Landing, NJ.

    This curriculum guide was developed at Atlantic Community College as part of a program to facilitate the training of persons with limited English-speaking ability for jobs, especially jobs in Atlantic City casinos. The project aimed to teach job skills and life coping skills along with English. The curriculum guide contains 10 units. Approximately…

  8. Academic Preparation for College: A Joint Project. Final Report.

    ERIC Educational Resources Information Center

    New Mexico Commission on Higher Education.

    A project to identify competencies needed by students entering college was undertaken jointly by the New Mexico Department of Education and the Commission on Higher Education. The first step was to review statewide data on enrollment in developmental/remedial college courses of graduates from New Mexico's public secondary schools. After a…

  9. Leech Lake American Indian Foster Care Project 1978. Final Report.

    ERIC Educational Resources Information Center

    Walker and Associates, Inc., Minneapolis, Minn.

    In its second year the project continued to attempt to reduce the incidence of separation of Indian children from their families and to establish permanent planning for those children who were removed, thus improving the child welfare services to Minnesota Chippewa Indian children and families on the Leech Lake Reservation through direct foster…

  10. Hospitality Occupational Skills Training Cooperative. Project HOST Final Report.

    ERIC Educational Resources Information Center

    Northwest Educational Cooperative, Des Plaines, IL.

    Project HOST (Hospitality Occupational Skills Training) provided vocational training and employment opportunities in the hotel industry to disadvantaged adult minority populations in Chicago. It demonstrated a model for successful cooperation between the business sector and a public vocational education agency and developed and piloted a…

  11. Project REACH. A Second Year Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Gross, Alan L.

    An evaluation was undertaken of the second year's work of a pilot adult literacy program called Project REACH (Reading, Education, Achievement), which was begun in 1987 in New York by the Governor's Office for Employee Relations (GOER) and the Civil Service Employees' Association (CSEA). The following findings were reported, among others: (1)…

  12. Project on Citizen Education in a Union Setting, Final Report.

    ERIC Educational Resources Information Center

    University and College Labor Education Association, East Lansing, MI.

    The report describes a project on union citizenship activity and presents recommendations from a labor education conference in Silver Spring, Maryland, November 9-10, 1977. Citizen education of union members involves training programs for workers undertaken either singly by unions or in concert with educational institutions. The report is…

  13. WRP: Final Report on Vermont's Welfare Restructuring Project.

    ERIC Educational Resources Information Center

    Scrivener, Susan; Hendra, Richard; Redcross, Cindy; Bloom, Dan; Michalopoulos, Charles; Walter, Johanna

    An evaluation was conducted of Vermont's Welfare Restructuring Project (WRP), one of the earliest statewide welfare reform programs designed to increase work and reduce reliance on welfare. To assess the difference WRP made, parents applying for or receiving cash assistance in Vermont from July 1994 to December 1996 were assigned randomly to one…

  14. Project Upper Cumberland, Title III ESEA. Final Report.

    ERIC Educational Resources Information Center

    Khanna, J. L.; And Others

    Project Upper Cumberland--serving 16 Tennessee counties from July 1, 1967 through September 30, 1970--sponsored a teachers' inservice program emphasizing human relations training, a cultural arts program (grades 1-12), and a guidance and counseling program (grades 1-9). All 3 programs had the general goal of changing and improving attitudes and…

  15. The Chicago JOBS Labor Mobility Project. Final Report.

    ERIC Educational Resources Information Center

    Helfer, Charles

    The purpose of the project was to relocate young, poor, unemployed Negroes from the inner core of Chicago to outlying suburban communities in order to provide greater upward mobility. Most were to have completed a JOBS (Job Opportunities Through Better Skills) program of prevocational counseling and skill training. (Author)

  16. Victorias energy efficiency and cogeneration project. Final report

    SciTech Connect

    1998-10-31

    This report describes a two-phase energy project currently contemplated for joint implementation at the Victorias Milling Company, a large sugar mill and refinery on the island of Negros in the Visayas region of the Philippines. The Energy Efficiency (EE) phase is expected to reduce of eliminate VMC`s fossil fuel consumption, which will have a direct and substantial impact on carbon emissions. Phase I is an EE project which involves the installation of equipment to reduce steam and electricity demand in the factories. Phase II, will involve retrofitting and increasing the capacity of the steam and power generation systems, and selling power to the grid. By increasing efficiency and output, the cogeneration project will allow the factory to use only bagasse sugar cane fiber waste as fuel for energy needs. The cogeneration project will also eliminate VMC`s electricity purchases and supply additional power for the island, which will offset generation capacity expansion on the island and the Visayas region.

  17. Final report of Project 617, the Energy Saver

    SciTech Connect

    1996-12-31

    The Project work was begun in January of 1995 and was completed in May of 1996. The authors performed a broad value engineering study to examine all parts and functions to lower costs, improve functioning and safety. The results of the Phase 1 work was a total redesign of the original Energy Saver resulting in two components instead of three, a weight of four pounds versus the original fourteen pounds and a reduction from 21 pieces to 10 pieces. The manufactured cost dropped from $350 to $175. Based on these improvements the Value Improvement Project has been successful. The second generation unit was named the BROIL-MASTER and has been registered under the Provisional Application (Patent) Program. The authors performed a technical analysis to determine the potential energy savings of applications identified and collect data on host product gas consumption, payback period, and other cost/saving relationships. The industrial search for energy project applications for the authors design was not successful. Seven Broil-Master demonstration projects have been successfully completed. The Broil-Master has received certification from the American Gas Association and UL approval is due by the end of July. The Restaurant Equipment Test Center of Pacific Gas and Electric is interested in testing the Broil-Master sometime in 1996. The Broil-Master was shown at an International Restaurant Equipment Show in September, 1995 and the National Restaurant Show in May, 1996. The authors now have under way four tests with chains and several other tests pending.

  18. CUTE Installation and Diffusion Project. Second Phase. Final Report.

    ERIC Educational Resources Information Center

    Soptick, John M.; Clothier, Grant M.

    The Cooperative Urban Teacher Education (CUTE) Project was initiated in 1967 by the Mid-continent Regional Educational Laboratory (McREL) to design an intensive, field-oriented undergraduate program to prepare effective teachers for inner-city schools. The results is a 16-week program which is conducted during the student teaching semester and…

  19. Hartford Project Concern Program. Final Evaluation Report, 1980-1981.

    ERIC Educational Resources Information Center

    Iwanicki, Edward F.; Gable, Robert K.

    This report evaluates Project Concern, a compensatory education program of the Hartford, Connecticut public schools, funded by Title I of the Elementary and Secondary Education Act, the State Act for Disadvantaged Children (SADC), and local compensatory education funds. The report analyzes participant selection procedures, describes program…

  20. The Local History Classroom Project, 1975/1977. Final Report.

    ERIC Educational Resources Information Center

    Council for Educational Technology, London (England).

    This report describes some curriculum development work done by the Local History Classroom Project (LHCP) which explores approaches to the classroom teaching of local history and possible roles for computerized banks of standardized historical data. Part one of the document gives a sample lesson developed from court records and newspaper articles.…

  1. Small Business Consortium: Research Project in Vocational Education. Final Report.

    ERIC Educational Resources Information Center

    Belcher, Jacquelyn; Hutchison, Kae R.

    Five community colleges and two vocational technical institutes located in King County, Washington, together with the Washington State Department of Employment Security, undertook a research project to (1) collect nationally available information on current research and successful practices in assistance to small businesses; (2) conduct a survey…

  2. Gypsy Field project in reservoir characterization. Final report

    SciTech Connect

    O`Meara, Jr., D. J.

    1997-05-01

    The overall objective of this project is to use the extensive Gypsy Field laboratory and data set as a focus for developing and testing reservoir characterization methods that are targeted at improved recovery of conventional oil. The Gypsy Field laboratory consists of coupled outcrop and subsurface sites which have been characterized to a degree of detail not possible in a production operation. Data from these sites entail geological descriptions, core measurements, well logs, vertical seismic surveys, a 3D seismic survey, crosswell seismic surveys, and pressure transient well tests. The overall project consists of four interdisciplinary sub-projects which are closely interlinked: modeling depositional environments; sweep efficiency; tracer testing; and integrated 3D seismic interpretation. The first of these aims at improving the ability to model complex depositional environments which trap movable oil. The second is a development geophysics project which proposes to improve the quality of reservoir geological models through better use of 3D seismic data. The third investigates the usefulness of a new numerical technique for identifying unswept oil through rapid calculation of sweep efficiency in large reservoir models. The fourth explores what can be learned from tracer tests in complex depositional environments, particularly those which are fluvial dominated.

  3. The Albuquerque Story. Future Schools Study Project. Final Report.

    ERIC Educational Resources Information Center

    Gresham, Robert L.; And Others

    This report summarizes chronologically a three-year ESEA Title III project to study the types of schools needed for the future. The major recommendation of the study was that an educational park should be established in the downtown area to provide enriched opportunities for pupils from widely different backgrounds and to serve as an experimental…

  4. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  5. Passive solar design strategies: Remodeling guidelines for conserving energy at home. [Final report

    SciTech Connect

    Not Available

    1991-12-31

    The idea of passive solar is simple, but applying it effectively does require information and attention to the details of design and construction. Some passive solar techniques are modest and low-cost, and require only small changes in remodeler`s typical practice. At the other end of the spectrum, some passive solar systems can almost eliminate a house`s need for purchased heating (and in some cases, cooling) energy -- but probably at a relatively high first cost. In between are a broad range of energy-conserving passive solar techniques. Whether or not they are cost-effective, practical and attractive enough to offer a market advantage to any individual remodeler depends on very specific factors such as local costs, climate, and market characteristics. Passive solar design strategies: Remodeling Guidelines For Conserving Energy At Homes is written to help give remodelers the information they need to make these decisions. Passive Solar Design Strategies is a package in three basic parts: The Guidelines contain information about passive solar techniques and how they work, and provides specific examples of systems which will save various percentages of energy; The Worksheets offer a simple, fill-in-the-blank method to pre-evaluate the performance of a specific design; The Worked Example demonstrates how to complete the worksheets for a typical residence.

  6. 77 FR 20840 - Bogue Chitto National Wildlife Refuge, LA and MS; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... in the Federal Register on February 20, 2009 (74 FR 7913). Please see that notice for more about the... Federal Register notice on May 27, 2011 (76 FR 30959). A news release was sent out to four local, State..., Louisiana, and Pearl River County, Mississippi. In the final CCP, we describe how we will manage this...

  7. Energy Conservation Education Leadership Institute. Final Report, Volume I [And] Volume II.

    ERIC Educational Resources Information Center

    Florida State Univ., Tallahassee.

    The document presents the final report of a summer institute to help high school classroom teachers develop and implement energy education programs. The document is presented in two volumes. Volume I contains workshop objectives, the program schedule, a list of participants, and evaluation results. Major objectives were to familiarize participants…

  8. 78 FR 68858 - Seal Beach National Wildlife Refuge, Orange County, CA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ..., updates to constituents, and a Federal Register notice (76 FR 16634; March 24, 2011). The draft CCP/EA... Fish and Wildlife Service Seal Beach National Wildlife Refuge, Orange County, CA; Final Comprehensive...) for the Seal Beach National Wildlife Refuge (Refuge). In the CCP, we describe how we will manage...

  9. 78 FR 16286 - Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... Federal Register (73 FR 76677) on December 17, 2008. For more about the initial process and the history of... comments in a notice of availability (77 FR 50155) on August 20, 2012. The 30-day comment period ended on... Fish and Wildlife Service Neal Smith National Wildlife Refuge, Jasper County, IA; Final...

  10. 76 FR 29259 - Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... notice of availability (75 FR 30422) on June 1, 2010. Swan Lake NWR was established in 1937 by Executive... notice of intent on (71 FR 20722, April 21, 2006). For more information about the initial process, see... Fish and Wildlife Service Swan Lake National Wildlife Refuge, Chariton County, MO; Final...

  11. 77 FR 75644 - Malheur National Wildlife Refuge, Harney County, OR; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... final CCP/EIS for the Refuge. We started this process through a notice in the Federal Register (74 FR... notice of availability in the Federal Register (77 FR 13141, March 5, 2012). The Refuge was established... solicited comments on the Draft CCP/EIS from March 5 to May 4, 2012 (77 FR 13139, March 5, 2012)....

  12. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Joe Taddeucci, P E

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  13. Final project report: High energy rotor development, test and evaluation

    SciTech Connect

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  14. Encoal mild coal gasification project: Final design modifications report

    SciTech Connect

    1997-07-01

    The design, construction and operation Phases of the Encoal Mild Coal Gasification Project have been completed. The plant, designed to process 1,000 ton/day of subbituminous Power River Basin (PRB) low-sulfur coal feed and to produce two environmentally friendly products, a solid fuel and a liquid fuel, has been operational for nearly five years. The solid product, Process Derived Fuel (PDF), is a stable, low-sulfur, high-Btu fuel similar in composition and handling properties to bituminous coal. The liquid product, Coal Derived Liquid (CDL), is a heavy, low-sulfur, liquid fuel similar in properties to heavy industrial fuel oil. Opportunities for upgrading the CDL to higher value chemicals and fuels have been identified. Significant quantities of both PDF and CDL have been delivered and successfully burned in utility and industrial boilers. A summary of the Project is given.

  15. The Andromeda Project: Final Results of Citizen Science Cluster Identification

    NASA Astrophysics Data System (ADS)

    Seth, Anil; Johnson, L. C.; Wallace, M.; Dalcanton, J.; Kapadia, A.; Lintott, C.; Simpson, R.; Skillman, E. D.; PHAT Team; Andromeda Project Team

    2014-01-01

    The Panchromatic Hubble Andromeda Treasury (PHAT) survey has completed data collection, having taken over 30 billion pixels of imaging data of the Andromeda galaxy over four years using the Hubble Space Telescope. These data contain the largest sample of star clusters observable in any galaxy, including our own Milky Way. The Andromeda Project is a citizen science project that recruited over 10,000 volunteers to identify thousands of star clusters in the PHAT imaging. We present results culminating from two rounds of cluster searching and the properties of the resulting sample. We discuss catalog completeness results derived from synthetic cluster data. This cluster sample represents a significant advance in our ability to study star and cluster formation on galaxy wide scales. We are using the resulting cluster sample to provide the best available constraints on the high-mass initial mass function and the fraction of star formation that results in bound star clusters.

  16. Insights from EPRI maintenance rule projects. Final report

    SciTech Connect

    Worledge, D.H.

    1996-05-01

    This report provides insights and their interpretation from four Tailored Collaboration projects which implemented the NRC Maintenance Rule (10CFR50.65) at nine nuclear generating units. Two of these projects involved full scale implementation of the rule at five units. The insights cover technical and implementation issues and are intended to provide additional input to utilities as they seek to resolve ambiguities in the rule. Additionally, an extensive account is provided of the technical basis for assessing, interpreting, and using, risk significance measures, developing performance criteria, and addressing the balance between reliability and availability. It is felt that with the changing climate of regulation this information will provide a resource that goes well beyond maintenance rule applications.

  17. Near-Site Transportation Infrastructure Project. Final report

    SciTech Connect

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities.

  18. THz transceiver characterization : LDRD project 139363 final report.

    SciTech Connect

    Nordquist, Christopher Daniel; Wanke, Michael Clement; Cich, Michael Joseph; Reno, John Louis; Fuller, Charles T.; Wendt, Joel Robert; Lee, Mark; Grine, Albert D.

    2009-09-01

    LDRD Project 139363 supported experiments to quantify the performance characteristics of monolithically integrated Schottky diode + quantum cascade laser (QCL) heterodyne mixers at terahertz (THz) frequencies. These integrated mixers are the first all-semiconductor THz devices to successfully incorporate a rectifying diode directly into the optical waveguide of a QCL, obviating the conventional optical coupling between a THz local oscillator and rectifier in a heterodyne mixer system. This integrated mixer was shown to function as a true heterodyne receiver of an externally received THz signal, a breakthrough which may lead to more widespread acceptance of this new THz technology paradigm. In addition, questions about QCL mode shifting in response to temperature, bias, and external feedback, and to what extent internal frequency locking can improve stability have been answered under this project.

  19. Framework for Adaptable Operating and Runtime Systems: Final Project Report

    SciTech Connect

    Patrick G. Bridges

    2012-02-01

    In this grant, we examined a wide range of techniques for constructing high-performance con gurable system software for HPC systems and its application to DOE-relevant problems. Overall, research and development on this project focused in three specifc areas: (1) software frameworks for constructing and deploying con gurable system software, (2) applcation of these frameworks to HPC-oriented adaptable networking software, (3) performance analysis of HPC system software to understand opportunities for performance optimization.

  20. DOE-University of Arizona Faculty Development Project. Final report

    SciTech Connect

    Fillerup, Joseph M.

    1980-09-08

    The DOE-University of Arizona Faculty Development Project on Energy successfully completed a faculty development program. There were three phases of the program consisting of: a three week energy workshop for teachers, participation and cooperation with Students for Safe Energy in presentation of an Alternative Energy Festival at the University of Arizona, and workshops for teachers conducted at Flowing Wells School District. Each of these is described. Attendees are listed and a director's evaluation of the workshop is given.

  1. Freihoelser Forst Local Training Area rehabilitation project. Final report

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D.; Johnson, D.O.; Severinghaus, W.D.; Brent, J.J.

    1991-12-01

    Intensive and continued use of the Freihoelser Forst Local Training Area (LTA) for military training activities had resulted in serious environmental problems, exemplified by a lack of vegetative cover and severe erosion by water and wind. The project`s goal was to develop and demonstrate rapid, cost-effective methods to stabilize the LTA`s barren, eroding maneuver areas and make training conditions more realistic. The major factors limiting rehabilitation efforts were the sandy, infertile, and acidic soils. The project was conducted in two phases. Phase I demonstrated and evaluated three separate rehabilitation treatments ranging in cost from moderate to expensive. Each treatment used a different type of soil amendment (fertilizer and straw, compost, or chicken manure), but all used identical seedbed preparation methods and seed mixtures. Phase I was conducted on relatively small replicated plots and was monitored three times during each growing season. All three treatments satisfactorily reestablished vegetation and controlled erosion. Because of their small size, the Phase I demonstration plots had only a minor stabilizing effect on the erosion problems of the LTA as a whole. The Phase II treatment was based on lessons teamed from Phase I and from other revegetation projects in Germany. Phase II revegetated a large area of the LTA, which included nearly all of the most severely disturbed land. Phase II, which was monitored in the same way as Phase I but for a shorter period of time, was highly successful in stabilizing most areas treated. The revegetation plant community was dominated by native grasses and legumes that stabilized the loose, sandy soils and improved the training realism of a major portion of the LTA.

  2. Advanced exterior sensor project : final report, September 2004.

    SciTech Connect

    Ashby, M. Rodema

    2004-12-01

    This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.

  3. The project for an energy-enriched curriculum: Final report

    SciTech Connect

    Not Available

    1984-01-01

    The Project for an Energy-Enriched Curriculum (PEEC) reported was a long-running effort at infusing energy/environment/economics (E/E/E) themes into the K-12 curriculum. While it was conducted as a single integrated effort by the National Science Teachers Association (NSTA), it is supported by a series of contracts and grants, during the period 1976 to 1984, from the Energy Research and Development Administration (ERDA) and the US Department of Energy (DOE).

  4. The convergence rate of approximate solutions for nonlinear scalar conservation laws. Final Report

    SciTech Connect

    Nessyahu, HAIM; Tadmor, EITAN.

    1991-07-01

    The convergence rate is discussed of approximate solutions for the nonlinear scalar conservation law. The linear convergence theory is extended into a weak regime. The extension is based on the usual two ingredients of stability and consistency. On the one hand, the counterexamples show that one must strengthen the linearized L{sup 2}-stability requirement. It is assumed that the approximate solutions are Lip{sup +}-stable in the sense that they satisfy a one-sided Lipschitz condition, in agreement with Oleinik's E-condition for the entropy solution. On the other hand, the lack of smoothness requires to weaken the consistency requirement, which is measured in the Lip'-(semi)norm. It is proved for Lip{sup +}-stable approximate solutions, that their Lip'convergence rate to the entropy solution is of the same order as their Lip'-consistency. The Lip'-convergence rate is then converted into stronger L{sup p} convergence rate estimates.

  5. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    NASA Technical Reports Server (NTRS)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  6. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  7. Canister Cleaning System Final Design Report Project A-2A

    SciTech Connect

    FARWICK, C.C.

    2000-06-15

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit.

  8. Final Scientifc Report - Hydrogen Education State Partnership Project

    SciTech Connect

    Leon, Warren

    2012-02-03

    Under the leadership of the Department of Energy Hydrogen and Fuel Cells program, Clean Energy States Alliance (CESA) educated and worked with state leaders to encourage wider deployment of fuel cell and hydrogen technologies. Through outreach to state policymakers, legislative leaders, clean energy funds, energy agencies, and public utility commissions, CESA worked to accomplish the following objectives of this project: 1. Provide information and technical assistance to state policy leaders and state renewable energy programs in the development of effective hydrogen fuel cell programs. 2. Identify and foster hydrogen program best practices. 3. Identify and promote strategic opportunities for states and the Department of Energy (DOE) to advance hydrogen technology deployment through partnerships, collaboration, and targeted activities. Over the three years of this project, CESA, with our partner National Conference of State Legislatures (NCSL), was able to provide credible information on fuel cell policies, finance, and technical assistance to hundreds of state officials and other stakeholders. CESA worked with its membership network to effectively educate state clean energy policymakers, program managers, and decision makers about fuel cell and hydrogen technologies and the efforts by states to advance those technologies. With the assistance of NCSL, CESA gained access to an effective forum for outreach and communication with state legislators from all 50 states on hydrogen issues and policies. This project worked to educate policymakers and stakeholders with the potential to develop and deploy stationary and portable fuel cell technologies.

  9. Yakima Fisheries Project : Final Environmental Impact Statement : Summary.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin. The State of Washington and the Yakama Indian Nation (YIN) would jointly direct the project. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two action alternatives have been proposed, in addition to the No Action alternative: Alternative (1) would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative (2) (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  10. Space Human Factors Engineering Gap Analysis Project Final Report

    NASA Technical Reports Server (NTRS)

    Hudy, Cynthia; Woolford, Barbara

    2006-01-01

    Humans perform critical functions throughout each phase of every space mission, beginning with the mission concept and continuing to post-mission analysis (Life Sciences Division, 1996). Space missions present humans with many challenges - the microgravity environment, relative isolation, and inherent dangers of the mission all present unique issues. As mission duration and distance from Earth increases, in-flight crew autonomy will increase along with increased complexity. As efforts for exploring the moon and Mars advance, there is a need for space human factors research and technology development to play a significant role in both on-orbit human-system interaction, as well as the development of mission requirements and needs before and after the mission. As part of the Space Human Factors Engineering (SHFE) Project within the Human Research Program (HRP), a six-month Gap Analysis Project (GAP) was funded to identify any human factors research gaps or knowledge needs. The overall aim of the project was to review the current state of human factors topic areas and requirements to determine what data, processes, or tools are needed to aid in the planning and development of future exploration missions, and also to prioritize proposals for future research and technology development.

  11. [Project Upper Cumberland. Final Report. Project Upper Cumberland Cultural Arts Program. Final Evaluation. Demonstration Program in Guidance and Counseling. An Evaluation.

    ERIC Educational Resources Information Center

    Flanders, John N.; And Others

    Project Upper Cumberland was a three year endeavor which served 16 Tennessee counties. The final report and evaluation, in three documents, summarizes the three innovative programs which it engendered: (1) teacher inservice training, emphasizing human relations; (2) a pilot cultural arts program (art, music, drama) for grades 1-12; and (3) a pilot…

  12. 2009 ESMD Space Grant Faculty Project Final Report

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; Ghanashyam, Joshi; Guo, Jiang; Conrad, James; Bandyopadhyay, Alak; Cross, William

    2009-01-01

    The Constellation Program is the medium by which we will maintain a presence in low Earth orbit, return to the moon for further exploration and develop procedures for Mars exploration. The foundation for its presence and success is built by the many individuals that have given of their time, talent and even lives to help propel the mission and objectives of NASA. The Exploration Systems Mission Directorate (ESMD) Faculty Fellows Program is a direct contributor to the success of directorate and Constellation Program objectives. It is through programs such as the ESMD Space Grant program that students are inspired and challenged to achieve the technological heights that will propel us to meet the goals and objectives of ESMD and the Constellation Program. It is through ESMD Space Grant programs that future NASA scientists, engineers, and mathematicians begin to dream of taking America to newer heights of space exploration. The ESMD Space Grant program is to be commended for taking the initiative to develop and implement programs that help solidify the mission of NASA. With the concerted efforts of the Kennedy Space Center educational staff, the 2009 ESMD Space Grant Summer Faculty Fellows Program allowed faculty to become more involved with NASA personnel relating to exploration topics for the senior design projects. The 2009 Project was specifically directed towards NASA's Strategic Educational Outcome 1. In-situ placement of Faculty Fellows at the NASA field Centers was essential; this allowed personal interactions with NASA scientists and engineers. In particular, this was critical to better understanding the NASA problems and begin developing a senior design effort to solve the problems. The Faculty Fellows are pleased that the ESMD Space Grant program is taking interest in developing the Senior Design courses at the university level. These courses are needed to help develop the NASA engineers and scientists of the very near future. It has been a pleasure to be

  13. Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

  14. Real Time Technology Application Demonstration Project Final Report

    SciTech Connect

    Volpe, John; Hampson, Steve; Johnson, Robert L

    2008-09-01

    The work and results described in this final report pertain to the demonstration of real-time characterization technologies applied to potentially contaminated surface soils in and around Area of Concern (AOC) 492 at the Paducah Gaseous Diffusion Plant (PGDP). The work was conducted under the auspices of Kentucky Research Consortium for Energy and Environment (KRCEE). KRCEE was created to support the Department of Energy's (DOE) efforts to complete the expeditious and economically viable environmental restoration of the Paducah Gaseous Diffusion Plant (PGDP), the Western Kentucky Wildlife Management Area (WKWMA), and surrounding areas.

  15. 36. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI

  16. 35. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI

  17. 38. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI

  18. Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement

    SciTech Connect

    1999-02-12

    The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. The alternatives analyzed were: the No Action Alternative, the Proposed Action, the Non-Thermal Treatment Alternative, and the Treatment and Storage Alternative. The Proposed Action is the Preferred Alternative. Under the Proposed Action/Preferred Alternative, the AMWTP facility would treat transuranic waste, alpha-contaminated low-level mixed waste, and low-level mixed waste in preparation for disposal. After treatment, transuranic waste would be disposed of at the Waste Isolation Pilot Plant in New Mexico. Low-level mixed waste would be disposed of at an approved disposal facility depending on decisions to be based on DOE's Final Waste Management Programmatic Environmental Impact Statement. Evaluation of impacts on land use, socioeconomics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, INEEL services, and environmental justice were included in the assessment.

  19. [Geriatric Authority of Holyoke Workplace Literacy Project.] Final Report. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Massachusetts Career Development Inst., Springfield.

    This final report documents the development of a workplace literacy program for 100 employees of the Geriatric Authority of Holyoke, Massachusetts (GAH), a major nonprofit nursing home and rehabilitation facility. It describes how GAH employees received instruction in English as a Second Language, adult basic education, and General Educational…

  20. Final report for SNL/NM environmental drilling project

    SciTech Connect

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.