Science.gov

Sample records for demonstration projects annual

  1. PFBC Utility Demonstration Project. Annual report, 1991

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  3. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    SciTech Connect

    Not Available

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  4. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  7. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    SciTech Connect

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  9. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Klenk, David P.

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    SciTech Connect

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    SciTech Connect

    West Valley Environmental Services LLC and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  13. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner, II, Robert E.; Fox, James R.; Hoch, Jerald J.; Werchowski, Rebecca L.

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  15. ENCOAL mild coal gasification demonstration project. Annual report, October 1994--September 1995

    SciTech Connect

    1996-01-01

    This document is the combination of the fourth quarter report (July - September 1995) and the 1995 annual report for the ENCOAL project. The following pages include the background and process description for the project, brief summaries of the accomplishments for the first three quarters, and a detailed fourth quarter report. Its purpose is to convey the accomplishments and current progress of the project. ENCOAL Corporation, a wholly-owned subsidiary of SMC Mining Company (formerly Shell Mining company, now owned by Zeigler Coal Holding Company), has completed the construction and start-up of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basis coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). The products, as alternative fuels sources, are expected to significantly lower current sulfur emissions at industrial and utility boiler sites throughout the nation, thereby reducing pollutants causing acid rain. In the LFC technology, coal is first deeply dried to remove water physically. The temperature is further raised in a second stage which results in decomposition reactions that form the new products. This chemical decomposition (mild gasification) creates gases by cracking reactions from the feed coal. The chemically altered solids are cooled and further processed to make PDF. The gases are cooled, condensing liquids as CDL, and the residual gases are burned in the process for heat. The process release for the ENCOAL plant predicted that one ton of feed coal would yield roughly {1/2} ton of PDF and {1/2} barrel of CDL. By varying plant running conditions, however, it has since been learned that the actual CDL recovery rate may be as much as 15% to 20% above the projections.

  16. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    SciTech Connect

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  17. 200 Sand Steamflood Demonstration Project. Sixth annual report, June 1981-June 1982

    SciTech Connect

    Alford, W.O.

    1983-08-01

    This demonstration project was initiated in the 200 Sand Pool in the Midway-Sunset Field, California Sand Pool to demonstrate the operational, recovery, and economic aspects of steamflooding a typical heavy oil reservoir which had unfavorable response to cyclic stimulation. The scope of the project involves 5 phases: (1) pilot site monitoring and evaluation; (2) pilot area expansion; (3) site selection for expansion to full-scale project; (4) expansion to full-scale steamflood; and (5) production monitoring. After expansion and steam injection for one year, the wells are averaging 8 B/D oil and 29 B/D water per well. This rate is above the 5 BOPD for cyclic stimulation. Most of the producing wells are steam stimulated about twice a year to enhance steam breakthrough from the continuous steam. The total area has averaged 319 B/D oil and 1233 B/D water the last year. 7 figures, 1 table.

  18. Micellar-polymer joint demonstration project, Wilmington Field, California. Third annual report, June 1978-July 1979

    SciTech Connect

    Staub, H.L.

    1981-08-01

    The micellar-polymer demonstration project to be conducted - through the design phase - in the HXa sand of Wilmington Field is proceeding satisfactorily but has fallen behind schedule. Results of some core floods were unsatisfactory. The recovery efficiencies were much lower than those achieved using the laboratory sample cosurfactant final design slug. Nearly six months of reformulating and additional core testing were required to finally achieve satisfactory laboratory results. Other laboratory tests were performed to optimize the polymer buffer for size and concentration. Other reservoir and reservoir fluid problems have been encountered in production and injection operations during the pre-flush period.

  19. ENCOAL Mild Coal Gasification Demonstration Project. Annual report, October 1993--September 1994

    SciTech Connect

    1995-03-01

    ENCOAL Corporation, a wholly-owned subsidiary of SMC Mining Company (formerly Shell Mining Company, now owned by Zeigler Coal Holding Company), has completed the construction and start-up of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basin coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). The LFC technology uses a mild pyrolysis or mild gasification process which involves heating the coal under carefully controlled conditions. The process causes chemical changes in the feed coal in contrast to conventional drying, which leads only to physical changes. Wet subbituminous coal contains considerable water, and conventional drying processes physically remove some of this moisture, causing the heating value to increase. The deeper the coal is physically dried, the higher the heating value and the more the pore structure permanently collapses, preventing resorption of moisture. However, deeply dried Powder River Basin coals exhibit significant stability problems when dried by conventional thermal processes. The LFC process overcomes these stability problems by thermally altering the solid to create PDF and CDL. Several of the major objectives of the ENCOAL Project have now been achieved. The LFC Technology has been essentially demonstrated. Significant quantities of specification CDL have been produced from Buckskin coal. Plant operation in a production mode with respectable availability (approaching 90%) has been demonstrated.

  20. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1989 Annual report, [January 1989--December 1989

    SciTech Connect

    Not Available

    1992-02-01

    The report summarizes unit operating experience and test program progress for 1989 on Colorado-Ute Electric Association`s Nucla CFB Demonstration Program. During this period, the objectives of the Nucla Station operating group were to correct problems with refractory durability, resolve primary air fan capacity limitations, complete the high ash and high sulfur coal tests, switch to Salt Creek coal as the operating fuel, and make the unit available for testing without capacity restrictions. Each of these objectives was addressed and accomplished, to varying degrees, except for the completion of the high sulfur coal acceptance tests. (VC)

  1. Coalinga polymer demonstration project. Fourth annual report, July 1978-July 1979

    SciTech Connect

    Schultz, V.

    1980-09-01

    A field demonstration test of displacement mobility control in the East Coalinga Field is being conducted in order to determine the relative merits of polymer flooding and waterflooding in a medium viscosity oil reservoir. The injection pattern consists of four inverted 5-spot patterns and an updip area. Water injection began in June 1976 and continued through April 1978. Polymer injection began in May 1978 and is ongoing. The overall production performance for the pilot has been far less than expected. The current oil production rate is currently below the expected primary decline rate. The polymer injection rate is substantially below original predictions and will increase the time required to inject the designed slug volume.

  2. LIMB demonstration project extension

    SciTech Connect

    Not Available

    1990-09-21

    The purpose of the DOE limestone injection multistage burner (LIMB) Demonstration Project Extension is to extend the data base on LIMB technology and to expand DOE's list of Clean Coal Technologies by demonstrating the Coolside process as part of the project. The main objectives of this project are: to demonstrate the general applicability of LIMB technology by testing 3 coals and 4 sorbents (total of 12 coal/sorbent combinations) at the Ohio Edison Edgewater plant; and to demonstrate that Coolside is a viable technology for improving precipitator performance and reducing sulfur dioxide emissions while acceptable operability is maintained. Progress is reported. 3 figs.

  3. Baca Geothermal Demonstration project legal and regulatory challenges. First semi-annual report for period through June 30, 1980

    SciTech Connect

    Province, S.G.; Walter, K.M.; Miller, J.

    1980-12-01

    The Legal and Regulatory Constraints Reports identify and describe the major legal and institutional constraints associated with the Baca Geothermal Demonstration Project. The impacts of these constraints on the Project in terms of cost, schedule, and technical design are also analyzed. The purpose of these reports is to provide a guide for future geothermal development.

  4. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  5. ALASKA VILLAGE DEMONSTRATION PROJECTS

    EPA Science Inventory

    Two demonstration projects were built as authorized by Section 113 of PL 92-500. Modular construction was used to provide central utility systems which included water supply, laundry, bathing, saunas, and wastewater treatment. Service to homes was by vehicular delivery. Fire dest...

  6. SOIL BIOVENTING DEMONSTRATION PROJECT

    EPA Science Inventory

    A pilot scale demonstration project of a soil bioventing system, which utilizes the biodegradation in soil and physical removal of VOC by induced air flow, is in operation at the U.S. Coast Guard Aviation Field in Traverse City, Michigan. he system is being tested to determine it...

  7. Nucla CFB Demonstration Project

    SciTech Connect

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  8. ARJIS satellite demonstration project

    NASA Astrophysics Data System (ADS)

    Severance, Steve; Williams, Carl

    2005-06-01

    In 2003, the California Space Authority (CSA) was provided funding by the U. S. Congress through the Defense Appropriations Act to develop a project that would demonstrate the U.S. space enterprise capability that would contribute to the effectiveness of those engaged in Homeland Security. The project was given broad latitude in selecting the area of Homeland Security to be addressed and the nature of the space technology to be applied. CSA became aware of a nascent law enforcement data-sharing project in the San Diego region known as the Automated Regional Justice Information System (ARJIS). First developed by the police departments in San Diego, ARJIS is an innovative system that shares criminal justice information among 50 federal, state, and local agencies. ARJIS was completing a pilot project that enabled officers to receive information on handheld computers, which was transmitted wirelessly through cellular networks. The accessed information came from several databases that collectively contained the entire region's crime and arrest reports, traffic citations, and incidents, as well as state and county wants and warrants. The fundamental limitations that plague all cellular-based devices caught CSA's attention and resulted in a cooperative effort to harden the communications link between the patrol officer and critical data. The principal goal of the SATCOM development task was to create a proof-of-concept application that would use SATCOM links to augment the current ARJIS handheld wireless (cellular) capability. The successful technical demonstration and the positive support for satellite communications from the law enforcement community showed that this project filled a need-both for improved information sharing and for highly reliable communications systems.

  9. Smart Grid Demonstration Project

    SciTech Connect

    Miller, Craig; Carroll, Paul; Bell, Abigail

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  10. Tidd PFBC demonstration project

    SciTech Connect

    Marrocco, M.

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  11. Integrated Gasification Combined Cycle (IGCC) demonstration project, Polk Power Station -- Unit No. 1. Annual report, October 1993--September 1994

    SciTech Connect

    1995-05-01

    This describes the Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project which will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,300 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 Btu/scf (LHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product.

  12. PFBC Utility Demonstration Project

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  13. CONNECT Special Demonstration Project.

    ERIC Educational Resources Information Center

    Hawk, Kim; And Others

    Project CONNECT (Inmate Advocacy) was developed to provide counseling to inmates involved in the education programs at Fayette County Prison in Uniontown, Pennsylvania, before and immediately following their release. Twenty-one inmates who had been selected through a screening process received individual basic skills remediation in a classroom…

  14. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1989-06-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  15. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1989-11-15

    The basic goal of the Limestone Injection Mitigation Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  16. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1989-03-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  17. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1988-12-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  18. NIOSH (National Institute for Occupational Safety and Health) grants: Research and demonstration projects, annual report, fiscal year 1988

    SciTech Connect

    Not Available

    1989-05-01

    Under the Occupational Safety and Health Act of 1970 and the Federal Mine Safety and Health Amendments Act of 1977, the National Institute of Occupational Safety and Health (NIOSH) conducted intramural and extramural research designed to improve the environment of the American worker. Projects dealt with the following program areas: Occupational lung disease in granite workers, poultry workers, semiconductor industry, cancer risk, byssinosis, radiation exposure, phosgene, lung clearance, textile workers, mineral exposure, hyperresponsiveness to ozone, coal workers respiratory disease, and immune responsiveness to chlorine; musculoskeletal injuries, back pain, lifting techniques, and grip strength; occupational cancers, traumatic injuries, disorders of reproduction, neurotoxic disorders, noise induced hearing loss, dermatologic conditions, psychological disorders, engineering control systems, respiratory research, and other occupational concerns, human metabolism of halothane, chromium toxicity, poison centers, polyimide sorbents, plasma proteins, and isocyanates. The report also included listings of grants active during fiscal year 1988, grant awards by program area, grant awards by region and state, grant number index, principal investigator index, and a grantee institution index.

  19. Solar Thermal Demonstration Project

    SciTech Connect

    Biesinger, K; Cuppett, D; Dyer, D

    2012-01-30

    HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with Kalwall building panels. An added feature of the Kalwall system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

  20. LIMB Demonstration Project Extension and Coolside Demonstration

    SciTech Connect

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO[sub 2]) and nitrogen oxides (NO[sub x]) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison's Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0[sub 2] removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0[sub 2] emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  1. Measuring Impact of Demonstration Projects.

    ERIC Educational Resources Information Center

    Fleischman, Howard L.

    A proposed evaluation model for measuring the impact of demonstration projects in vocational education defines sets of criteria, standards, and documentation for both interim and final acceptable evidence of project impact. Interim acceptable evidence is that evidence of project success which should be expected during the demonstration grant…

  2. VLBI2010 Demonstrator Project

    NASA Astrophysics Data System (ADS)

    Niell, A.

    2008-12-01

    . Observations demonstrating the full four-band configuration are planned for October. In this talk the results of these tests, the improvements that are anticipated for the operational VLBI2010 network, and the status of other developments in the next generation of geodetic VLBI systems will be presented. * Bruce Whittier, Mike Titus, Jason SooHoo, Dan Smythe, Alan Rogers, Jay Redmond, Mike Poirier, Chuck Kodak, Alan Hinton, Ed Himwich, Skip Gordon, Mark Evangelista, Irv Diegel, Brian Corey, Tom Clark, Chris Beaudoin (in reverse alphabetical order)

  3. Demonstration Projects: Implementation and Institutionalization.

    ERIC Educational Resources Information Center

    Bina, James V.; Hull, William L.

    Three purposes are listed for this paper: (1) to share the results of a national survey of vocational education exemplary projects; (2) to emphasize the importance of a project director's communication with five clientele audiences; and (3) to suggest specific actions likely to result in institutionalization of a demonstration project. A brief…

  4. Toms Creek IGCC Demonstration Project

    SciTech Connect

    Virr, M.J.

    1992-01-01

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020[degree]F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  5. Toms Creek IGCC Demonstration Project

    SciTech Connect

    Virr, M.J.

    1992-11-01

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020{degree}F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  6. Earth Science Capability Demonstration Project

    NASA Technical Reports Server (NTRS)

    Cobleigh, Brent

    2006-01-01

    A viewgraph presentation reviewing the Earth Science Capability Demonstration Project is shown. The contents include: 1) ESCD Project; 2) Available Flight Assets; 3) Ikhana Procurement; 4) GCS Layout; 5) Baseline Predator B Architecture; 6) Ikhana Architecture; 7) UAV Capability Assessment; 8) The Big Picture; 9) NASA/NOAA UAV Demo (5/05 to 9/05); 10) NASA/USFS Western States Fire Mission (8/06); and 11) Suborbital Telepresence.

  7. The Habitat Demonstration Unit Project

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Gill, Tracy; Tri, Terry; Howe, Scott

    2009-01-01

    This paper will describe an overview of the NASA-led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a technology-pull project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition. The HDU project will be part of the 2010 Desert Research and Technologies Simulations (DRATS). The purpose of this project is to develop, integrate, test, and evaluate a HDU in the context of the mission architectures and surface operation concepts. This HDU is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. A multi-center approach with be utilized to build, integrate, and test the HDU project through a shared collaborative effort of multiple NASA centers. This project is part of the strategic plan from the ESMD Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment which includes two Lunar Electric Rovers and the HDU during the 2010 analog field test. This paper will describe the overall objectives, its various configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests.

  8. Plasma hearth process demonstration project

    SciTech Connect

    Geimer, R.M.; Gillins, R.L.

    1995-12-31

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the US Department of Energy (DOE) Office of Technology Development Mixed Waste Focus Area. The PHP is a high temperature thermal treatment process using a plasma arc torch in a stationary, refractory lined chamber that destroys organics and stabilizes the residuals in a nonleaching, vitrified waste form, greatly improving the disposability of the waste. This paper describes the PHP system and summarizes test results to date, including volume reduction, destruction and removal efficiencies for organic wastes, and emission characteristics. Tests performed so far demonstrate that the PHP adresses DOE mixed waste final waste form requirements and US Environmental Protection Agency Toxicity Characteristic Leaching Procedure requirements.

  9. Industrial heat pump demonstration project

    SciTech Connect

    Not Available

    1988-09-01

    This booklet describes an industrial heat pump demonstration project conducted at a plant in Norwich, New York. The project required retrofitting an open-cycle heat pump to a single-effect, recirculating-type evaporator. The heat pump design uses an electrically driven centrifugal compressor to recover the latent heat of the water vapor generated by the evaporator. The compressed vapor is returned to the process, where it displaces the use of boiler steam. The goal was to reduce costs associated with operating the evaporator, which is used for reduction the water content of whey (a liquid by-product from cheese production). The retrofit equipment has now completed more than one year of successful operation. Heat pump coefficient of performance has been measured and is in the range of 14 to 18 under varying process conditions. Generalization of project results indicates that the demonstrated technology achieved attractive economics over a wide range of energy price assumptions, especially when the heat pump is applied to larger processes. 5 refs., 17 figs.

  10. Clean Coal Diesel Demonstration Project

    SciTech Connect

    Robert Wilson

    2006-10-31

    A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

  11. Exploration Medical System Demonstration Project

    NASA Technical Reports Server (NTRS)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  12. Landfill gas to electricity demonstration project

    NASA Astrophysics Data System (ADS)

    Giuliani, A. J.; Cagliostro, L. A.

    1982-03-01

    Medium Btu methane gas is a naturally occurring by product of anaerobic digestion of landfilled municipal solid waste. The energy potential of landfill gas in New York State is estimated to be 61 trillion Btu's per year or the equivalent of 10 percent of the natural gas used annually in the State. The 18-month Landfill Gas to Electricity Demonstration Project conducted at the Fresh Kills Landfill in Staten Island, New York conclusively demonstrated that landfill gas is an acceptable fuel for producing electricity using an internal combustion engine/generator set. Landfill gas proved to be a reliable and consistent fuel source during a six-month field test program. Engine exhaust emissions were determined to be comparable to that of natural gas and no unusually high corrosion rates on standard pipeline material were found.

  13. Alkaline Waterflooding Demonstration Project, Ranger Zone, Long Beach Unit, Wilmington Field, California. Fourth annual report, June 1979-May 1980. Volume 3. Appendices II-XVII

    SciTech Connect

    Carmichael, J.D.

    1981-03-01

    Volume 3 contains Appendices II through XVII: mixing instructions for sodium orthosilicate; oil displacement studies using THUMS C-331 crude oil and extracted reservoir core material from well B-110; clay mineral analysis of B-827-A cores; sieve analysis of 4 Fo sand samples from B-110-IA and 4 Fo sand samples from B-827-A; core record; delayed secondary caustic consumption tests; long-term alkaline consumption in reservoir sands; demulsification study for THUMS Long Beach Company, Island White; operating plans and instructions for DOE injection demonstration project, alkaline injection; caustic pilot-produced water test graphs; well test irregularities (6/1/79-5/31/80); alkaline flood pump changes (6/1/79-5/31/80); monthly DOE pilot chemical waterflood injection reports (preflush injection, alkaline-salt injection, and alkaline injection without salt); and caustic safety procedures-alkaline chemicals.

  14. Mississippi Labor Mobility Demonstration Project.

    ERIC Educational Resources Information Center

    Huff, H. Pope; Salter, Leo G.

    The project concentrated on providing intrastate relocation assistance to disadvantaged rural workers in Mississippi, with a flexible minimum of supportive service. Assistance consisted of counseling, providing housing, travel arrangements, job interviews, job development, financial aid, and recruiting the unemployed. (Author)

  15. Alkaline Waterflooding Demonstration Project, Ranger Zone, Long Beach Unit, Wilmington Field, California. Fourth annual report, June 1979-May 1980. Volume 2. Appendix I

    SciTech Connect

    Carmichael, J.D.

    1981-03-01

    This appendix to the 1979-1980 annual report contains basic laboratory test reports, detailed instructions, plans and procedures, and various calculated data derived from operating observations. These are considered to be of sufficient interest to warrant their publication, but because of their bulk, to be of too much detail for inclusion in the body of the report. The table of contents specifies each group of data or description as a section which is believed to be complete in itself. The order of inclusion of the various sections has been dictated by the sequence of their reference in the body of the 1979-1980 annual report.

  16. Large-scale CFB combustion demonstration project

    SciTech Connect

    Nielsen, P.T.; Hebb, J.L.; Aquino, R.

    1998-07-01

    The Jacksonville Electric Authority's large-scale CFB demonstration project is described. Given the early stage of project development, the paper focuses on the project organizational structure, its role within the Department of Energy's Clean Coal Technology Demonstration Program, and the projected environmental performance. A description of the CFB combustion process in included.

  17. Large-scale CFB combustion demonstration project

    SciTech Connect

    Nielsen, P.T.; Hebb, J.L.; Aquino, R.

    1998-04-01

    The Jacksonville Electric Authority`s large-scale CFB demonstration project is described. Given the early stage of project development, the paper focuses on the project organizational structure, its role within the Department of Energy`s Clean Coal Technology Demonstration Program, and the projected environmental performance. A description of the CFB combustion process is included.

  18. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  19. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  20. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  1. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  2. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  3. Vehicle to Grid Demonstration Project

    SciTech Connect

    Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

    2010-12-31

    This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

  4. Navy fuel cell demonstration project.

    SciTech Connect

    Black, Billy D.; Akhil, Abbas Ali

    2008-08-01

    This is the final report on a field evaluation by the Department of the Navy of twenty 5-kW PEM fuel cells carried out during 2004 and 2005 at five Navy sites located in New York, California, and Hawaii. The key objective of the effort was to obtain an engineering assessment of their military applications. Particular issues of interest were fuel cell cost, performance, reliability, and the readiness of commercial fuel cells for use as a standalone (grid-independent) power option. Two corollary objectives of the demonstration were to promote technological advances and to improve fuel performance and reliability. From a cost perspective, the capital cost of PEM fuel cells at this stage of their development is high compared to other power generation technologies. Sandia National Laboratories technical recommendation to the Navy is to remain involved in evaluating successive generations of this technology, particularly in locations with greater environmental extremes, and it encourages their increased use by the Navy.

  5. Composite Cryotank Technologies and Demonstration Project

    NASA Video Gallery

    The Composite Cryogenic Propellant Tank project will develop and ground demonstrate large-scale composite cryogenic propellant tanks applicable to heavy-lift launch vehicles, propellant depots, and...

  6. The Wisconsin Rural Development Demonstration Project.

    ERIC Educational Resources Information Center

    McCoy, Palmer E.; Jones, Eleanor

    Nineteen Wisconsin counties were the site of the four-year Rural Development Demonstration Project, one of five such projects in the nation. Among the project's objectives were to accelerate sound economic, social, cultural and environmental development and to provide alternatives for living in non-metropolitan areas while providing greater…

  7. Project Aloha. Annual Evaluation Report.

    ERIC Educational Resources Information Center

    Berryessa Union Elementary School District, San Jose, CA.

    This program, included in "Effective Reading Programs...," was begun in 1971 and serves 1,826 children of varying socioeconomic levels in K-4. Project ALOHA is a mainland demonstration of the Hawaii English Program, a total instructional system that provides goals, materials, a management system, and inservice training. The program is highly…

  8. Tidd PFBC Demonstration Project, A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-31

    The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

  9. Model Tech Prep Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Southern Maryland Educational Consortium, La Plata.

    The Southern Maryland Educational Consortium's Tech Prep Model Demonstration project is described in this final report. The consortium members are Calvert, Charles, and St. Mary's county school districts and Charles County Community College in southern Maryland. The project is based on a 4 + 2 model in which ninth-grade students develop career…

  10. LIMB Demonstration Project Extension and Coolside Demonstration. [Final report

    SciTech Connect

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison`s Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0{sub 2} removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0{sub 2} emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  11. ENCOAL mild coal gasification project. Annual report

    SciTech Connect

    Not Available

    1993-10-01

    This document is the combination of the fourth quarter report (July--September 1993) and the 1993 annual report for the ENCOAL project. The following pages include the background and process description for the project, brief summaries of the accomplishments for the first three quarters, and a detailed fourth quarter report. Its purpose is to convey the accomplishments and current progress of the project. ENCOAL Corporation, has completed the construction of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basin coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). ENCOAL submitted an application to the US Department of Energy (DOE) in August 1989, soliciting joint funding of the project in the third round of the Clean Coal Technology Program. The project was selected by DOE in December, 1989 and the Cooperative Agreement approved in September, 1990. Construction, commissioning, and start-up of the ENCOAL mild coal gasification facility was completed in June of 1992, and the project is currently in the operations phase. Some plant modifications have been required and are discussed in this report.

  12. X-43C Flight Demonstrator Project Overview

    NASA Technical Reports Server (NTRS)

    Moses, Paul L.

    2003-01-01

    The X-43C Flight Demonstrator Project is a joint NASA-USAF hypersonic propulsion technology flight demonstration project that will expand the hypersonic flight envelope for air-breathing engines. The Project will demonstrate sustained accelerating flight through three flights of expendable X-43C Demonstrator Vehicles (DVs). The approximately 16-foot long X-43C DV will be boosted to the starting test conditions, separate from the booster, and accelerate from Mach 5 to Mach 7 under its own power and autonomous control. The DVs will be powered by a liquid hydrocarbon-fueled, fuel-cooled, dual-mode, airframe integrated scramjet engine system developed under the USAF HyTech Program. The Project is managed by NASA Langley Research Center as part of NASA's Next Generation Launch Technology Program. Flight tests will be conducted by NASA Dryden Flight Research Center off the coast of California over water in the Pacific Test Range. The NASA/USAF/industry project is a natural extension of the Hyper-X Program (X-43A), which will demonstrate short duration (approximately 10 seconds) gaseous hydrogen-fueled scramjet powered flight at Mach 7 and Mach 10 using a heavy-weight, largely heat sink construction, experimental engine. The X-43C Project will demonstrate sustained accelerating flight from Mach 5 to Mach 7 (approximately 4 minutes) using a flight-weight, fuel-cooled, scramjet engine powered by much denser liquid hydrocarbon fuel. The X-43C DV design flows from integrating USAF HyTech developed engine technologies with a NASA Air-Breathing Launch Vehicle accelerator-class configuration and Hyper-X heritage vehicle systems designs. This paper describes the X-43C Project and provides the background for NASA's current hypersonic flight demonstration efforts.

  13. Prototypical Consolidation Demonstration Project: Final report

    SciTech Connect

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy`s Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG&G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG&G Idaho`s assessments of the equipment and procedures developed by NUS.

  14. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    SciTech Connect

    Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  15. LIFAC sorbent injection desulfurization demonstration project

    SciTech Connect

    Not Available

    1992-03-06

    In December 1990, the US Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled LIFAC Sorbent Injection Desulfurization Demonstration Project.'' The host site for this $17 million, three-phase project is Richmond Power and Light's Whitewater Valley Unit No. 2 in Richmond, Indiana. The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75--85% of the sulfur dioxide (SO{sub 2}) in the flue gas. In this report, progress for the period July--September 1991 is covered.

  16. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1998-12-23

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Conducting bench-scale tests to produce coke and acceptable tar from the process to satisfy Koppers, a prospective stakeholder; Consolidation of the project team players to execute the full size commercial cokemaking reactor demonstration; and Progress made in advancing the design of the full size commercial cokemaking reactor.

  17. A Rural Citizens Health Promotion Demonstration Project.

    ERIC Educational Resources Information Center

    Sutherland, Mary; And Others

    1989-01-01

    This article describes a health promotion demonstration project which addressed the health problem of hypertension, as related to variables of excercise, weight, blood pressure measurement and reduction, medication compliance, and nutritional practices. Participants (N=18) were senior citizens who were associated with a small, rural, predominantly…

  18. ELKINS MINE DRAINAGE POLLUTION CONTROL DEMONSTRATION PROJECT

    EPA Science Inventory

    In 1964 several federal agencies in cooperation with the State of West Virginia initiated a project to demonstrate methods to control the pollution from abandoned underground and surface mines in the Roaring Creek-Grassy Run Watersheds near Elkins, West Virginia. The Roaring Cree...

  19. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1999-06-23

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (4) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (5) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Detailed studies of LTV's site for the installation of the commercial Demonstration Unit with site specific layouts; Environmental Work; Firm commitments for funding from the private sector; and Federal funding to complement the private contribution.

  20. Calderon Cokemaking Process/Demonstration Project

    SciTech Connect

    1998-04-08

    This project deals with the demonstration of a coking process using proprietary technology of Calderon with the following objectives in order to enable its commercialization: (i) making coke of such quality as to be suitable for use in high driving (highly productive) blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; and (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process. The activities of the past quarter were entirely focused on operating the Calderon Process Development Unit (PDU-I) in Alliance, Ohio conducting a series of tests under steady state using coal from Bethlehem Steel and U.S. Steel in order to demonstrate the above. The objectives mentioned above were successfully demonstrated.

  1. The Habitat Demonstration Unit Project Overview

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Grill, Tracy R.; Tri, Terry O.; Howe, Alan S.

    2010-01-01

    This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support

  2. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1996-06-21

    This project deals with the demonstration of a full size commercial coking retort using Calderon's novel process for making metallurgical coke. Tests are currently being conducted on a heat resistant alloy by subjecting such alloy to raw gases from an actual operating coke oven at LTV Steel's coke plant in Warren, Ohio to determine the effects of sulfurous gases on the alloy before ordering 232,000 lbs of this alloy for the full size commercial coking retort. Design engineering is proceeding.

  3. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  4. Advanced Coal Conversion Process Demonstration Project

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  5. Baltimore residential assistance demonstration project: Final report

    SciTech Connect

    1998-09-01

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  6. Southern Nevada Alternative Fuels Demonstration Project

    SciTech Connect

    Hyde, Dan; Fast, Matthew

    2009-12-31

    The Southern Nevada Alternative Fuels Program is designed to demonstrate, in a day-to-day bus operation, the reliability and efficiency of a hydrogen bus operation under extreme conditions. By using ICE technology and utilizing a virtually emission free fuel, benefits to be derived include air quality enhancement and vehicle performance improvements from domestically produced, renewable energy sources. The project objective is to help both Ford and the City demonstrate and evaluate the performance characteristics of the E-450 H2ICE shuttle buses developed by Ford, which use a 6.8-liter supercharged Triton V-10 engine with a hydrogen storage system equivalent to 29 gallons of gasoline. The technology used during the demonstration project in the Ford buses is a modified internal combustion engine that allows the vehicles to run on 100% hydrogen fuel. Hydrogen gives a more thorough fuel burn which results in more power and responsiveness and less pollution. The resultant emissions from the tailpipe are 2010 Phase II compliant with NO after treatment. The City will lease two of these E-450 H2ICE buses from Ford for two years. The buses are outfitted with additional equipment used to gather information needed for the evaluation. Performance, reliability, safety, efficiency, and rider comments data will be collected. The method of data collection will be both electronically and manually. Emissions readings were not obtained during the project. The City planned to measure the vehicle exhaust with an emissions analyzer machine but discovered the bus emission levels were below the capability of their machine. Passenger comments were solicited on the survey cards. The majority of comments were favorable. The controllable issues encountered during this demonstration project were mainly due to the size of the hydrogen fuel tanks at the site and the amount of fuel that could be dispensed during a specified period of time. The uncontrollable issues encountered during this

  7. Test Use Project. Annual Report.

    ERIC Educational Resources Information Center

    Choppin, Bruce H.; And Others

    One of the two major phases of the Test Use Project of the Center for the Study of Evalaution (CSE) is discussed; that is, the collection and analyses of survey data from a national sample of teachers and principals representing the targeted grades/schools. Some historical background influencing that phase of the project is provided. The findings…

  8. Camp Sacajawea Passive Solar Demonstration Project

    SciTech Connect

    Not Available

    1983-08-31

    The intent of the Passive Solar Demonstration Project was to have: an actual demonstration of the effectiveness of a passive solar design and working automatic shading devices; accurate data of energy saved by the passive design and shading devices; a brochure distributed to architects, builders, and consumers, with the monitoring data and information about the project; and the continued monitoring of the building to help explain to those who are using the building the value of the system; this would not only include the 7000 members, bu visitors and other users of the facility. To accomplish these goals, a monitoring system was installed in the recently build Passive Solar Lodge at Camp Sacajawea on Casper Mountain south of Casper, Wyoming. The building was monitored continously for the remainder of the project. The installation of the automatic shading device, a curtain wall was accomplished but had some difficulty. The results indicate there is some effectiveness of the Curtain Wall, but a quantitative value would be impossible at this time.

  9. Customer-focused planning: Demonstration project summaries

    SciTech Connect

    George, S.S. )

    1992-12-01

    To succeed in the increasingly competitive and dynamic markets in which they operate, electric utilities are focusing ever greater attention on understanding and meeting customer needs. EPRI's Customer Focused Planning (CFP) project was established to develop concepts and tools that will help utilities enhance their commitment to customer service. The project team conducted a series of interviews and meetings with participating utilities to collaboratively implement crucial steps in the CFP process. Although there is no unique set of tools or single management approach for improving product and service delivery, customer-focused companies have at least five ideals in common. They (1) define goals and objectives in concrete terms, (2) extend the planning boundaries of the organization to include all members of the energy services infrastructure, (3) painstakingly link functional activities directly to customer needs, (4) incorporate the customer's voice in new product/ service design, and (5) align performance measures with customer needs. In addition, customer-focused companies use a variety of methods to improve customer satisfaction and company performance. These methods include conducting market research, developing market processes such as demand-side management contracting or bidding to reveal customer preferences, and involving customers more directly in the planning process. This report summarizes two brief demonstration projects conducted as part of EPRI's CFP project, one at Commonwealth Edison Company (CECo) and one at PSI Energy. The CECo project emphasized developing customer-focused performance measures for telephone inquiries. The PSI Energy project involved a one-day workshop underscoring two important CFP elements-understanding customer wants and explicitly linking those wants to utility activities.

  10. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1998-09-22

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (iv) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: � Consolidation of the project team-players; � Recruiting Koppers Industries as an additional stakeholder; � Developing a closed system for the production of binder pitch from tar in the Calderon coking process as the incentive for Koppers to join the team; � Gathering appropriate equipment for conducting a set of experiments at bench scale to simulate tar quality produced from the Calderon coking process for the production of binder pitch; and � Further progress made in the design of the commercial coking reactor.

  11. Wildlife habitat evaluation demonstration project. [Michigan

    NASA Technical Reports Server (NTRS)

    Burgoyne, G. E., Jr.; Visser, L. G.

    1981-01-01

    To support the deer range improvement project in Michigan, the capability of LANDSAT data in assessing deer habitat in terms of areas and mixes of species and age classes of vegetation is being examined to determine whether such data could substitute for traditional cover type information sources. A second goal of the demonstration project is to determine whether LANDSAT data can be used to supplement and improve the information normally used for making deer habitat management decisions, either by providing vegetative cover for private land or by providing information about the interspersion and juxtaposition of valuable vegetative cover types. The procedure to be used for evaluating in LANDSAT data of the Lake County test site is described.

  12. Secure Interoperable Open Smart Grid Demonstration Project

    SciTech Connect

    Magee, Thoman

    2014-12-31

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG

  13. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1998-04-08

    This project deals with the demonstration of a coking reactor (Process Development Unit-- PDU-11) using Calderon's proprietary technology for making commercially acceptable coke. The activities of the past quarter were focused on the following: 1. Testing and Designing of the Submerged Quenching Closed System for the Process; 2. Usage of the Cracked Desulfurized Gas as a Reducing Gas to Make Directly Reduced Iron (DRI) in Order to Make the Process Economics Viable; 3. Changes in the Ceramic Liners for Supporting Them in the Coking Reactor; 4. Work Towards Testing of U.S. Steel's Coal in the Existing Process Development Unit in Alliance (PDU-1); 5. Permitting.

  14. Results of a Formal Methods Demonstration Project

    NASA Technical Reports Server (NTRS)

    Kelly, J.; Covington, R.; Hamilton, D.

    1994-01-01

    This paper describes the results of a cooperative study conducted by a team of researchers in formal methods at three NASA Centers to demonstrate FM techniques and to tailor them to critical NASA software systems. This pilot project applied FM to an existing critical software subsystem, the Shuttle's Jet Select subsystem (Phase I of an ongoing study). The present study shows that FM can be used successfully to uncover hidden issues in a highly critical and mature Functional Subsystem Software Requirements (FSSR) specification which are very difficult to discover by traditional means.

  15. Nucla circulating atmospheric fluidized bed demonstration project

    SciTech Connect

    Keith, Raymond E.

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute's decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  16. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    2000-09-19

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (iv) conducting a blast furnace test to demonstrate the compatibility of the coke produced; (v) demonstrating that coke can be produced economically, at a level competitive with coke imports; and (vi) applying the Calderon technology to making additional iron units. The activities of the past quarter were focused on the following: (1) Bethlehem Steel's withdrawal and efforts expended to substitute U.S. Steel for Bethlehem; (2) Assessment work performed with U.S. Steel to show that the Calderon Technology has merit and would add to U.S. Steel's economic benefit by being involved in it, including for making additional iron units; (3) Addressing material selection and heat input capacity to increase heat input into the processing reactor by actual modeling of such approach; (4) Construction of two full size courses of heating tiles to verify the manufacturing and the fitting of the tiles with one another; (5) Making available equipment to test carbon deposition on sorbent; and (6) Permitting issues.

  17. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    2000-06-21

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (iv) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (v) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter continued to be focused on the following: Concluding the Negotiation and completing Contracts among Stakeholders of the Team; Revision of Final Report for Phase I; Engineering Design Progress; Selection of Systems Associates, Inc. for design of Control System; Conclusion of Secrecy Agreement with Carborundum (St. Gobain); and Permitting Work and Revisions.

  18. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    2000-03-22

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (iv) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (v) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter continued to be focused on the following: Concluding the Negotiation and completing Contracts among Stakeholders of the Team; Revision of Final Report for Phase I; Engineering Design Progress; Selection of Systems Associates, Inc. for design of Control System; Conclusion of Secrecy Agreement with Carborundum (St. Gobain); and Permitting Work and Revisions.

  19. Tropical Mosquito Assemblages Demonstrate ‘Textbook’ Annual Cycles

    PubMed Central

    Franklin, Donald C.; Whelan, Peter I.

    2009-01-01

    Background Annual biological rhythms are often depicted as predictably cyclic, but quantitative evaluations are few and rarely both cyclic and constant among years. In the monsoon tropics, the intense seasonality of rainfall frequently drives fluctuations in the populations of short-lived aquatic organisms. However, it is unclear how predictably assemblage composition will fluctuate because the intensity, onset and cessation of the wet season varies greatly among years. Methodology/Principal Findings Adult mosquitoes were sampled using EVS suction traps baited with carbon dioxide around swamplands adjacent to the city of Darwin in northern Australia. Eleven sites were sampled weekly for five years, and one site weekly for 24 years, the sample of c. 1.4 million mosquitoes yielding 63 species. Mosquito abundance, species richness and diversity fluctuated seasonally, species richness being highly predictable. Ordination of assemblage composition demonstrated striking annual cycles that varied little from year to year. The mosquito assemblage was temporally structured by a succession of species peaks in abundance. Conclusion/Significance Ordination provided strong visual representation of annual rhythms in assemblage composition and the means to evaluate variability among years. Because most mosquitoes breed in shallow freshwater which fluctuates with rainfall, we did not anticipate such repeatability; we conclude that mosquito assemblage composition appears adapted to predictable elements of the rainfall. PMID:20011531

  20. Illinois drainage water management demonstration project

    USGS Publications Warehouse

    Pitts, D.J.; Cooke, R.; Terrio, P.J.

    2004-01-01

    Due to naturally high water tables and flat topography, there are approximately 4 million ha (10 million ac) of farmland artificially drained with subsurface (tile) systems in Illinois. Subsurface drainage is practiced to insure trafficable field conditions for farm equipment and to reduce crop stress from excess water within the root zone. Although drainage is essential for economic crop production, there have been some significant environmental costs. Tile drainage systems tend to intercept nutrient (nitrate) rich soil-water and shunt it to surface water. Data from numerous monitoring studies have shown that a significant amount of the total nitrate load in Illinois is being delivered to surface water from tile drainage systems. In Illinois, these drainage systems are typically installed without control mechanisms and allow the soil to drain whenever the water table is above the elevation of the tile outlet. An assessment of water quality in the tile drained areas of Illinois showed that approximately 50 percent of the nitrate load was being delivered through the tile systems during the fallow period when there was no production need for drainage to occur. In 1998, a demonstration project to introduce drainage water management to producers in Illinois was initiated by NRCS4 An initial aspect of the project was to identify producers that were willing to manage their drainage system to create a raised water table during the fallow (November-March) period. Financial assistance from two federal programs was used to assist producers in retrofitting the existing drainage systems with control structures. Growers were also provided guidance on the management of the structures for both water quality and production benefits. Some of the retrofitted systems were monitored to determine the effect of the practice on water quality. This paper provides background on the water quality impacts of tile drainage in Illinois, the status of the demonstration project, preliminary

  1. Education & Collection Facility GSHP Demonstration Project

    SciTech Connect

    Joplin, Jeff

    2015-03-28

    The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to a recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an efficient

  2. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1998-06-22

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitating commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on three main activities: Continuation of design of the coking reactor; Raising funds from the private sector; and Detailed analysis of the tests conducted in Alliance, Ohio. The design of the reactor work centered on the provision for the capability to inspect and maintain the internals of the reactor. The activities relating to raising funds from the steel industry have been fruitful. Bethlehem Steel has agreed to contribute funds. The collected data from the tests at Alliance were analyzed and a detailed report was completed and presented to the International Iron & Steel Institute by invitation.

  3. SIMBIOS Project 1998 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta, S.

    1999-01-01

    The purpose of this series of technical reports is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Ocean Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant to substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issues by an operational project.

  4. SIMBIOS Project 1999 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    1999-01-01

    The purpose of this technical memorandum is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  5. Pinon Pine Power Project. Annual report, January--December 1994

    SciTech Connect

    1995-01-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project is a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies.

  6. Kalispel Resident Fish Project : Annual Report, 2001.

    SciTech Connect

    Andersen, Todd

    2002-01-01

    In 2001 the Kalispel Natural Resource Department (KNRD) continued assessing habitat and population enhancement projects for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat enhancement measures, as outlined in recommendations from the 1996, 1997, and 1998 annual reports, were monitored during field season 1999, 2000, and 2001. Post assessments were used to evaluate habitat quality, stream morphology and fish populations where enhancement projects were implemented.

  7. Calderon cokemaking process/demonstration project

    SciTech Connect

    1995-10-01

    The Clean Air Act Amendments of 1990 set new emission standards for hazardous air pollutants from coke ovens. Congress, recognizing that the coke industry faces technological and financial difficulties in meeting these new, stringent emission standards, required the U.S. Environmental Protection Agency and DOE to conduct a joint six-year research and development program to assist the industry in developing and commercializing new technologies and work practices that would significantly reduce hazardous coke oven emissions. DOE`s purpose for sponsoring the proposed demonstration project is to provide the coke industry with a new option for the economical production of high quality coke that significantly reduces the quantity of pollutants entering the environment.

  8. Medium Duty Electric Vehicle Demonstration Project

    SciTech Connect

    Mackie, Robin J. D.

    2015-05-31

    The Smith Electric Vehicle Demonstration Project (SDP) was integral to the Smith business plan to establish a manufacturing base in the United States (US) and produce a portfolio of All Electric Vehicles (AEV’s) for the medium duty commercial truck market. Smith focused on the commercial depot based logistics market, as it represented the market that was most ready for the early adoption of AEV technology. The SDP enabled Smith to accelerate its introduction of vehicles and increase the size of its US supply chain to support early market adoption of AEV’s that were cost competitive, fully met the needs of a diverse set of end users and were compliant with Federal safety and emissions requirements. The SDP accelerated the development and production of various electric drive vehicle systems to substantially reduce petroleum consumption, reduce vehicular emissions of greenhouse gases (GHG), and increase US jobs.

  9. LIFAC Sorbent Injection Desulfurization Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    Sorbent injection is a potentially important alternative to conventional wet lime and limestone scrubbing, and this project is another effort to test alternative sorbent injection approaches. In comparison to wet systems, LIFAC, with recirculation of the sorbent, removes less sulfur dioxide - 75--85% relative to 90% or greater for conventional scrubbers -- and requires more reagent material. However, if the demonstration is wet scrubbing systems: LIFAC is relatively easy to retrofit to an existing boiler and requires less area than conventional wet FGD systems. LIFAC is less expensive to install than conventional wet FGD processes. LIFAC's overall costs measured on a dollar-per-ton SO[sub 2] removed basis are less, an important advantage in a regulatory regime with trading of emission allocations. LIFAC produces a dry, readily disposable waste by-product versus a wet product. LIFAC is relatively simple to operate.

  10. LIFAC Sorbent Injection Desulfurization Demonstration Project

    SciTech Connect

    Not Available

    1991-01-01

    LIFAC combines upper-furnace limestone injection followed by post- furnace humidification in an activation reactor located between the air preheater and the ESP. The process produces a dry and stable waste product that is partially removed from the bottom of the activation reactor and partially removed at the ESP. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the US DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the fifth Technical Progress Report covering the period October 1, 1991 through the end of December 1991. Due to the power plant's planned outage schedule, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

  11. Controlled Hydrogen Fleet and Infrastructure Demonstration Project

    SciTech Connect

    Dr. Scott Staley

    2010-03-31

    This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while

  12. Three-stage combustion demonstration projects update

    SciTech Connect

    Ashworth, B.; Zawadzki, E.; Murrell, F.; Shroyer, D.; Gallenbach, T.

    2000-07-01

    The Ashworth Combustor is a pulverized coal-fired system that reduces the three major air pollutants (NO{sub x}, SO{sub 2} and particulate) associated with coal combustion. A 50 million Btu/hr combustion system will be retrofitted to a stoker boiler at the Lincoln Development Center in Lincoln, Illinois. Startup and testing re scheduled for mid 2000. With this technology, a two-stage slagging combustor is used with furnace over-fire air (the third stage). Pulverized coal/limestone are fired/calcined in the combustor. limestone (lime) is added to flux the slag and capture sulfur in a molten slag eutectic as a non-leaching calcium sulfide. Beside deep NO{sub x} reduction, 70%+SO{sub 2} and 70 to 80% particulate reductions are projected for the Ashworth Combustor. ClearStack, the Illinois Department of Commerce and Community Affairs Office of Coal Development and Marketing and the Ohio Coal Development Office (OCDO) are sponsoring the Ashworth Combustor demonstration. The Stage3Cyclone is a simple retrofit to cyclone-fired boilers to reduce NO{sub x} emissions to low levels. The existing cyclone barrels are used as the first stage of combustion and the conventional cyclone feed coal size (-1/4 inch) is used. Limestone is added to flux the coal ash. Second stage air is added in the furnace at the re-entrant throat level followed by over-fire air (OFA) injection in the upper part of the furnace. The technique is to be demonstrated on a southern Illinois Power Cooperative 33 MWe cyclone-fired unit in Marion, Illinois. Funding arrangements are being made and testing is projected for late 2000.

  13. Governmental Accounting: Comprehensive Annual Financial Report Project.

    ERIC Educational Resources Information Center

    Moncada, Susan M.

    This paper provides student materials for a course project in which students read, analyze, and interpret the information in an actual comprehensive annual financial report (CAFR) of a government entity (a city with a population greater than 40,000), and is based on the actual reviewer's checklist used by the Government Finance Officers…

  14. National Writing Project 2009 Annual Report

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2009

    2009-01-01

    Writing as a tool for thinking, learning, and communicating is crucial to academic and career success as well as to active citizenship in a democracy. This annual report of the National Writing Project features teachers of math, chemistry, art, history, and business who develop their students as writers. These educators employ writing to engage…

  15. Oregon Migrant Health Project, 1970 Annual Report.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    The 1970 annual report on the Oregon Migrant Health Project discusses health services for migrant agricultural workers and their families (approximately 30,000 individuals) who worked and lived temporarily in various Oregon counties. As noted, some 9,000 of the 30,000 migrants were estimated to be in need of some type of medical service. Thus, the…

  16. Oregon Migrant Health Project, 1971 Annual Report.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    In its 9th year of providing migrant health services through a U.S. Public Health Service Continuing Migrant Health Act grant, this Oregon Migrant Health Project annual report is concerned with (1) the health services provided during the 1970-71 harvest season through a contractual arrangement between the Oregon State Health Division and 10 county…

  17. Wave Power Demonstration Project at Reedsport, Oregon

    SciTech Connect

    Mekhiche, Mike; Downie, Bruce

    2013-10-21

    Ocean wave power can be a significant source of large‐scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high‐voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon‐based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take‐off subsystem are complete; additionally the power take‐off subsystem has been successfully integrated into the spar.

  18. MODIL cryocooler producibility demonstration project results

    SciTech Connect

    Cruz, G.E.; Franks, R.M.

    1993-06-24

    The production of large quantities of spacecraft needed by SDIO will require a cultural change in design and production practices. Low rates production and the need for exceedingly high reliability has driven the industry to custom designed, hand crafted, and exhaustingly tested satellites. These factors have mitigated against employing design and manufacturing cost reduction methods commonly used in tactical missile production. Additional challenges to achieving production efficiencies are presented by the SDI spacecraft mission requirement. IR sensor systems, for example, are comprised of subassemblies and components that require the design, manufacture, and maintenance of ultra precision tolerances over challenging operational lifetimes. These IR sensors demand the use of reliable, closed loop, cryogenic refrigerators or active cryocoolers to meet stringent system acquisition and pointing requirements. The authors summarize some spacecraft cryocooler requirements and discuss their observations regarding Industry`s current production capabilities of cryocoolers. The results of the Lawrence Livermore National Laboratory (LLNL) Spacecraft Fabrication and Test (SF and T) MODIL`s Phase I producibility demonstration project are presented. The current project that involves LLNL and industrial participants is discussed.

  19. The fetal imaging workstation demonstration project.

    PubMed

    Lee, W

    1996-01-01

    Congenital birth defects are a leading cause of infant mortality. Early detection of fetal anomalies by prenatal ultrasound may improve clinical outcome in selected cases. However, many training programs are hindered by curriculum weaknesses which include: (1) limited physician exposure to ultrasound anomalies; (2) inadequate postnatal correlation with prenatal findings; (3) constraints imposed by static images for ultrasound training; and (4) difficulty with understanding complex three-dimensional anatomy. The Fetal Imaging Workstation Demonstration Project addresses these problems by illustrating how computers can supplement traditional prenatal ultrasound training through interactive multimedia. The project uses a laserdisc library of ultrasound video images as source material for a variety of interactive software tutorials. An educational testing module has been developed that can evaluate diagnostic skills through simulated ultrasound studies provided by the laserdisc library. An interactive three-dimensional fetal heart model also provides a new way for physicians to better understand their two-dimensional ultrasound studies. A survey suggests that this prototype has been widely accepted by housestaff physicians and that there is a perceived need for this supplementary training. Future work will address the educational effectiveness of these materials and will consider cost-effective ways to disseminate the software for other institutions. However, future development must be implemented against a background of rapidly emerging technologies involving faster computers, digital video, and virtual reality applications. PMID:9007213

  20. SIMBIOS Project; 2003 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    2003-01-01

    The purpose of this technical report is to provide current documentation of the the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-99 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.

  1. Exploration Medical System Demonstration (EMSD) Project

    NASA Technical Reports Server (NTRS)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  2. Brown Grease to Biodiesel Demonstration Project Report

    SciTech Connect

    San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

    2013-01-30

    program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP's anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project's environmental impacts were expected to include: Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biodiesel and Methane gas produced in the Anaerobic digester, Carbon Dioxide, is also a greenhouse gas; it is 20 times weaker for the same amount (per mole

  3. Formal methods demonstration project for space applications

    NASA Technical Reports Server (NTRS)

    Divito, Ben L.

    1995-01-01

    The Space Shuttle program is cooperating in a pilot project to apply formal methods to live requirements analysis activities. As one of the larger ongoing shuttle Change Requests (CR's), the Global Positioning System (GPS) CR involves a significant upgrade to the Shuttle's navigation capability. Shuttles are to be outfitted with GPS receivers and the primary avionics software will be enhanced to accept GPS-provided positions and integrate them into navigation calculations. Prior to implementing the CR, requirements analysts at Loral Space Information Systems, the Shuttle software contractor, must scrutinize the CR to identify and resolve any requirements issues. We describe an ongoing task of the Formal Methods Demonstration Project for Space Applications whose goal is to find an effective way to use formal methods in the GPS CR requirements analysis phase. This phase is currently under way and a small team from NASA Langley, ViGYAN Inc. and Loral is now engaged in this task. Background on the GPS CR is provided and an overview of the hardware/software architecture is presented. We outline the approach being taken to formalize the requirements, only a subset of which is being attempted. The approach features the use of the PVS specification language to model 'principal functions', which are major units of Shuttle software. Conventional state machine techniques form the basis of our approach. Given this background, we present interim results based on a snapshot of work in progress. Samples of requirements specifications rendered in PVS are offered to illustration. We walk through a specification sketch for the principal function known as GPS Receiver State processing. Results to date are summarized and feedback from Loral requirements analysts is highlighted. Preliminary data is shown comparing issues detected by the formal methods team versus those detected using existing requirements analysis methods. We conclude by discussing our plan to complete the remaining

  4. Observations on DICOM demonstrations at the RSNA annual meetings

    NASA Astrophysics Data System (ADS)

    Moore, Stephen M.

    1996-05-01

    The Radiological Society of North America (RSNA) has sponsored demonstrations of the DICOM Standard. The technical details of the demonstrations were initially defined by the MedPACS section of NEMA beginning in 1992 and in subsequent years by RSNA. The Mallinckrodt Institute of Radiology was awarded a series of contracts by the RSNA to provide Central Test Node (CTN) software at the RSNA annual meetings to help vendors demonstrate interoperability. A goal of the early demonstrations was to have vendors communicate with one implementation of the Standard to minimize the amount of testing that needed to be performed prior to the RSNA Annual Meetings. Now that the Standard is better understood and implementations are more mature, vendors are offering more commercial products that utilize the Standard and which communicate with equipment manufactured by other vendors. The DICOM Standard is a technical specification which defines interfaces between equipment. These interfaces are currently defined for network, point to point and disk media. As a technical specification, the Standard does not tell the reader how to design an implementation nor does it provide insight into the thought process of the writers. This paper describes some of the implementation questions and issues that we have seen while working with the CTN software and vendors during the last four years. Examples of problem areas include application entity titles, generation of DICOM unique identifiers and queries for the query/retrieve service classes. The DICOM Standard defines the message formats for association negotiation and exchange of data across the network but provides flexibility in how these messages are used. A specific example is that an application is allowed to propose every service class defined by the Standard when requesting an association but may choose to exchange messages using only one service class once the association is established (for example, storage of CR data). We captured

  5. Integrated monitoring and surveillance system demonstration project

    SciTech Connect

    Aumeier, S.E.; Walters, G.; Kotter, D.; Walrath, W.M.; Zamecnik, R.J.

    1997-07-01

    We present a summary of efforts associated with the installation of an integrated system for the surveillance and monitoring of stabilized plutonium metals and oxides in long-term storage. The product of this effort will include a Pu storage requirements document, baseline integrated monitoring and surveillance system (IMSS) prototype and test bed that will be installed in the Fuel Manufacturing Facility (FMF) nuclear material vault at Argonne National Laboratory - West (ANL-W), and a Pu tracking database including data analysis capabilities. The prototype will be based on a minimal set of vault and package monitoring requirements as derived from applicable DOE documentation and guidelines, detailed in the requirements document, including DOE-STD-3013-96. The use of standardized requirements will aid individual sites in the selection of sensors that best suit their needs while the prototype IMSS, located at ANL-W, will be used as a test bed to compare and contrast sensor performance against a baseline integrated system (the IMSS), demonstrate system capabilities, evaluate potential technology gaps, and test new hardware and software designs using various storage configurations. With efforts currently underway to repackage and store a substantial quantity of plutonium and plutonium-bearing material within the DOE complex, this is an opportune time to undertake such a project. 4 refs.

  6. Town of Edinburg landfill reclamation demonstration project

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  7. LIFAC Sorbent Injection Desulfurization Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    The LIFAC technology has similarities to other sorbent injection technologies using humidification, but employs a unique patented vertical reaction chamber located down-stream of the boiler to facilitate and control the sulfur capture and other chemical reactions. This chamber improves the overall reaction efficiency enough to allow the use of pulverized limestone rather than more expensive reagents such as lime which are often used to increase the efficiency of other sorbent injection processes. Sorbent injection is a potentially important alternative to conventional wet lime and limestone scrubbing, and this project is another effort to test alternative sorbent injection approaches. In comparison to wet systems, LIFAC, with recirculation of the sorbent, removes less sulfur dioxide - 75--85% relative to 90% or greater for conventional scrubbers - and requires more reagent material. However, if the demonstration is successful, LIFAC will offer these important advantages over wet scrubbing systems: LIFAC is relatively easy to retrofit to an existing boiler and requires less area than conventional wet FGD systems; LIFAC is less expensive to install than conventional wet FGD processes; LIFAC's overall costs measured on a dollar-per-ton S0{sub 2} removed basis are less, an important advantage in a regulatory regime with trading of emission allocations. LIFAC produces a dry, readily disposable waste by-product versus a wet product; and LIFAC is relatively simple to operate.

  8. WSF Biodiesel Demonstration Project Final Report

    SciTech Connect

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

  9. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  10. UNIVERSITY OF KANSAS SMART GRID DEMONSTRATION PROJECT

    EPA Science Inventory

    The University of Kansas (KU) EcoHawks Design Project began in 2008 with the conversion of a discarded 1974 Volkswagen Super Beetle into a fuel neutral series hybrid running on 100% biodiesel created from waste vegetable oil. This project continued in year two through upgradi...

  11. Big Island Demonstration Project - Black Liquor

    SciTech Connect

    2006-08-01

    Black liquor is a papermaking byproduct that also serves as a fuel for pulp and paper mills. This project involves the design, construction, and operation of a black liquor gasifier that will be integrated into Georgia-Pacific's Big Island facility in Virginia, a mill that has been in operation for more than 100 years.

  12. 76 FR 80907 - TRICARE Prime Urgent Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... of the Secretary TRICARE Prime Urgent Care Demonstration Project AGENCY: Department of Defense..., entitled Department Of Defense TRICARE Prime Urgent Care Demonstration Project. The demonstration project is intended to test whether allowing four visits to an urgent care center without requiring...

  13. 76 FR 12080 - TRICARE Access to Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... of the Secretary TRICARE Access to Care Demonstration Project AGENCY: Department of Defense. ACTION..., entitled Department of Defense TRICARE Access to Care Demonstration Project. The demonstration project is intended to improve access to urgent care including minor illness or injury for Coast Guard...

  14. Utility Scale Wind turbine Demonstration Project

    SciTech Connect

    Terry Fredericks

    2006-03-31

    The purpose of the Three Affiliated Tribes proposing to Department of Energy was nothing new to Denmark. National Meteorological Studies have proved that North Dakota has some of the most consistence wind resources in the world. The Three Affiliated Tribes wanted to assess their potential and become knowledgeable to developing this new and upcoming resource now valuable. By the Tribe implementing the Utility-scale Wind Turbine Project on Fort Berthold, the tribe has proven the ability to complete a project, and has already proceeded in a feasibility studies to developing a large-scale wind farm on the reservation due to tribal knowledge learned, public awareness, and growing support of a Nation wanting clean renewable energy. The tribe is working through the various measures and regulations with the want to be self-sufficient, independent, and marketable with 17,000 times the wind energy needed to service Fort Berthold alone.

  15. FIELD DEMONSTRATION AND QUALITY ASSURANCE PROJECT PLAN

    EPA Science Inventory

    The Demonstration of innovative field devices for the measurement of mercury in soil and sediment is being conducted under the EPA's SITE Program in February 2003 at the United States Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee and th...

  16. An Overhead Projection Demonstration of Optical Activity

    ERIC Educational Resources Information Center

    Hill, John W.

    1973-01-01

    Describes the use of two polarizing lenses, a yellow filter, an oatmeal bos, a piece of cardboard, a 1,000 ml beaker, and an overhead projector to demonstrate compound optical activity to large classes. Indicates the presence of an accuracy within 1-2 degrees of usually acceptable data. (CC)

  17. DOE`s annealing prototype demonstration projects

    SciTech Connect

    Warren, J.; Nakos, J.; Rochau, G.

    1997-02-01

    One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable through a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy`s Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana`s Marble Hill nuclear power plant. The MPR team`s annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company`s nuclear power plant at Midland, Michigan. This paper describes the Department`s annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges.

  18. Cryogenic Barrier Demonstration Project. Final report

    SciTech Connect

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  19. Milliken Clean Coal Technology Demonstration Project. Project performance summary, Clean Coal Technology Demonstration Program

    SciTech Connect

    None, None

    2002-11-30

    The New York State Electric & Gas Corporation (NYSEG) demonstrated a combination of technologies at its Milliken Station in Lansing, New York, designed to: (1) achieve high sulfur dioxide (SO2) capture efficiency, (2) bring nitrogen oxide (NOx) emissions into compliance with Clean Air Act Amendments of 1990 (CAAA), (3) maintain high station efficiency, and (4) eliminate waste water discharge. This project is part of the U.S. Department of Energy’s (DOE) Clean Coal Technology Demonstration Program (CCTDP) established to address energy and environmental concerns related to coal use. DOE sought cost-shared partnerships with industry through five nationally competed solicitations to accelerate commercialization of the most promising advance coal-based power generation and pollution control technologies. The CCTDP, valued at over five billion dollars, has significantly leveraged federal funding by forging effective partnerships founded on sound principles. For every federal dollar invested, CCTDP participants have invested two dollars. These participants include utilities, technology developers, state governments, and research organizations. The project presented here was one of nine selected in January 1991 from 33 proposals submitted in response to the program’s fourth solicitation.

  20. Solar energy parking canopy demonstration project

    SciTech Connect

    Cylwik, Joe; David, Lawrence

    2015-09-24

    The goal of this pilot/demonstration program is to measure the viability of using solar photovoltaic (PV) technology at three locations in a mountain community environment given the harsh weather conditions. An additional goal is to reduce long-term operational costs, minimize green house gas emissions, lower the dependency on energy produced from fossil fuels, and improve the working environment and health of city employees and residents.

  1. Calderon Cokemaking Process/Demonstration Project

    SciTech Connect

    1998-04-08

    During this reporting period an agreement was entered into with Bechtel Corporation for design and construction of Calderon cokemaking facilities (see enclosed letter of February 28, 1997). A second agreement with Bechtel Enterprises to commercialize the Calderon technology as a worldwide business has progressed; during the forthcoming quarter, it is expected to have in place an agreement with Bechtel Enterprises (see attached letter of February 20, 1997). Thyssen Still Otto Anlagentechnik (TSOA), the world's largest builder of conventional cokemaking facilities indicated that it would be please to join Bechtel and Calderon in the demonstration and implementation of Calderon's cokemaking technology (see attached letter of January, 1997).

  2. Nucla circulating atmospheric fluidized bed demonstration project

    SciTech Connect

    Not Available

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  3. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    SciTech Connect

    Not Available

    1992-02-01

    The report summarizes unit operating experience and test program progress for 1989 on Colorado-Ute Electric Association's Nucla CFB Demonstration Program. During this period, the objectives of the Nucla Station operating group were to correct problems with refractory durability, resolve primary air fan capacity limitations, complete the high ash and high sulfur coal tests, switch to Salt Creek coal as the operating fuel, and make the unit available for testing without capacity restrictions. Each of these objectives was addressed and accomplished, to varying degrees, except for the completion of the high sulfur coal acceptance tests. (VC)

  4. Poland petroleum refinery sludge lagoon demonstration project

    SciTech Connect

    Altman, D.J.

    2000-05-05

    The US Department of Energy and the Institute for Ecology of Industrial Area have been working together to develop mutually beneficial, cost-effective environmental remediation technologies such as the demonstration of bioremediation techniques for the clean up of acidic petroleum sludge impacted soils at an oil refinery in southern Poland. After an expedited site characterization, treatability study, and a risk assessment study, a remediation strategy was devised. The waste material was composed primarily of high molecular weight paraffinic and polynuclear aromatic hydrocarbons. A biopile design which employed a combination of passive and active aeration in conjunction with nutrient and surfactant application as used to increase the biodegradation of the contaminants of concern.

  5. The ENCOAL Mild Gasification Demonstration Project

    SciTech Connect

    Not Available

    1990-07-01

    The DOE plans to enter into a Cooperative Agreement with ENCOAL Corporation, a wholly owned subsidiary of Shell Mining Company, for the cost-shared design, construction and operation of a mild gasification facility based on Liquids-from-Coal (LFC) technology. The facility is planned to be located at the Triton Coal Company's Buckskin Mine near Gillette, Wyoming. The mild gasification process to be demonstrated will produce two new, low-sulfur fuel forms (a solid and a liquid) from subbituminous coal. The new fuel forms would be suitable for combustion in commercial, industrial, and utility boilers. This environmental assessment has been prepared by the DOE to comply with the requirements of the NEPA. Pollutant emissions, land use, water, and waste management are briefly discussed. 3 figs., 5 tabs.

  6. 76 FR 60007 - TRICARE Demonstration Project for the Philippines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... of the Secretary TRICARE Demonstration Project for the Philippines AGENCY: Department of Defense... TRICARE demonstration project for the Philippines. SUMMARY: This notice is to advise interested parties of... Philippines.'' The purpose of this demonstration is to validate an alternative approach to...

  7. 75 FR 71171 - Social Security Disability Program Demonstration Project: Benefit Offset National Demonstration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... From the Federal Register Online via the Government Publishing Office ] SOCIAL SECURITY ADMINISTRATION Social Security Disability Program Demonstration Project: Benefit Offset National Demonstration (BOND) AGENCY: Social Security Administration. ACTION: Notice. SUMMARY: We are announcing the...

  8. Kalispel Resident Fish Project : Annual Report, 1997.

    SciTech Connect

    Donley, Christopher; Lockwoood, Jr., Neil

    1997-01-01

    In 1997 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) continued the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat enhancement measures, as outlined in the recommendations from the 1996 annual report, were conducted during field season 1997. Fencing and planting of riparian areas and instream structures were implemented. As a precursor to these enhancement efforts, pre-assessments were conducted to determine the affects of the enhancement. Habitat quality, stream morphology and fish populations were pre-assessed. This season also began the first year of post-assessment monitoring and evaluation of measures implemented during 1996. The largemouth bass hatchery construction was completed in October and the first bass were introduced to the facility that same month. The first round of production is scheduled for 1998.

  9. Planning and Evaluating Telecommunications Demonstration Projects and Assessing the Costs of Telecommunications Demonstration Projects. Final Report #146-03.

    ERIC Educational Resources Information Center

    Clippinger, John H.; Fain, Sanford B.

    This two-report volume was prepared to describe approaches for evaluating individual Office of Telecommunications Policy (OTP) demonstration projects in the future and to aid demonstration project directors in project planning and development. The first report focuses on the role of planning and evaluation activities, stressing their importance in…

  10. 20 CFR 638.700 - Experimental, research, and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., at his or her discretion, may undertake experimental, research, or demonstration projects for the... undertaken jointly with other Federal or federally assisted programs. (c) The Secretary may waive...

  11. TRICARE senior demonstration of military managed care--DOD. Notice of demonstration project.

    PubMed

    1998-07-17

    already covered by DoD's annual appropriation. However, under the authorizing statute, DoD must meet its current level of effort for its Medicare-eligible beneficiaries before receiving payments from the Medicare Trust Fund. That is, DoD must continue to fund health care at a certain expenditure level for its Medicare-eligible population before it may be reimbursed by HCFA for care provided to TRICARE Senior Prime enrollees. The Balanced Budget Act of 1997 required DoD and HHS to complete a memorandum of agreement (MOA) specifying the operational requirements of the demonstration project. That MOA was completed on February 13, 1998, and is published below. Except as provided in the MOA, TRICARE Senior Prime will be implemented consistent with applicable provisions of the CHAMPUS/TRICARE regulation, particularly 32 CFR sections 199.17 and 199.18. PMID:10181251

  12. Multiview Projection Using CADKEY Freeze-Frame Demonstrations.

    ERIC Educational Resources Information Center

    Kelso, Robert P.; Ziai, M. Reza

    1988-01-01

    Describes a three-dimensional computer aided design software package, CADKEY, for demonstrating orthographic orthodirectional projection theory to a classroom. Provides several figures for showing the demonstrations. (Author/YP)

  13. Pinon Pine Power Project. Annual report, August 1992--December 1993

    SciTech Connect

    1994-11-01

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 104 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV.

  14. Community Based Demonstration Projects: Willamette Ecosystem Services Project (WESP)

    EPA Science Inventory

    EPA’s Ecosystem Services Research Program in the Office of Research and Development is focused on the study of ecosystem services and the benefits to human well-being provided by ecological systems. As part of this research effort, the Willamette Ecosystems Services Project (WE...

  15. Student Assistance Program Demonstration Project Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Pollard, John A.; Houle, Denise M.

    This document presents the final report on the evaluation of California's model student assistance program (SAP) demonstration projects implemented in five locations across the state from July 1989 through June 1992. The report provides an overall, integrated review of the evaluation of the SAP demonstration projects, summarizes important findings…

  16. Pinon pine project. Annual report, January 1995--December 1995

    SciTech Connect

    1996-04-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the U.S. Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit will be designated as Tracy Unit No. 4. SPPCo, the project participant, has contracted with the Foster Wheeler USA Corporation (FW USA) for the overall project management, engineering, procurement and construction of the project. FW USA in turn has subcontracted with The M.W. Kellogg Company (MWK) for the engineering and procurement of key components for the Gasifier Island.

  17. AREAWIDE SUPPRESSION OF FIRE ANTS: DEMONSTRATION PROJECT IN MISSISSIPPI, 2006

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The USDA-ARS demonstration project for the suppression of imported fire ants has entered its sixth year. In 2005, Mississippi State University joined the project monitoring sites in Clay and Grenada Counties. The Areawide project integrates biological control agents with the chemical ...

  18. Ferrocyanide Safety Project: FY 1991 annual report

    SciTech Connect

    Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

    1992-06-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy's Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

  19. Ferrocyanide Safety Project: FY 1991 annual report

    SciTech Connect

    Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

    1992-06-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy`s Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

  20. Recycling and composting demonstration projects for the Memphis region

    SciTech Connect

    Muller, D. )

    1992-05-01

    This report documents the development and implementation of the project entitled Recycling and Composting Demonstration Projects for the Memphis Region.'' The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  1. Recycling and composting demonstration projects for the Memphis region

    SciTech Connect

    Muller, D.

    1992-05-01

    This report documents the development and implementation of the project entitled ``Recycling and Composting Demonstration Projects for the Memphis Region.`` The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  2. Steam Generator Group Project. Annual report, 1982

    SciTech Connect

    Clark, R.A.; Lewis, M.

    1984-02-01

    The Steam Generator Group Project (SGGP) is an NRC program joined by additional sponsors. The SGGP utilizes a steam generator removed from service at a nuclear plant (Surry 2) as a vehicle for research on a variety of safety and reliability issues. This report is an annual summary of progress of the program for 1982. Information is presented on the Steam Generator Examination Facility (SGEF), especially designed and constructed for this research. Loading of the generator into the SGEF is then discussed. The report then presents radiological field mapping results and personnel exposure monitoring. This is followed by information on field reduction achieved by channel head decontaminations. The report then presents results of a secondary side examination through shell penetrations placed prior to transport, confirming no change in generator condition due to transport. Decontamination of the channel head is discussed followed by plans for eddy current testing and removal of the plugs placed during service. Results of a preliminary profilometry examination are then provided.

  3. Vitrification facility at the West Valley Demonstration Project

    SciTech Connect

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project`s vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project`s background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing.

  4. Advanced Turbine Technology Applications Project (ATTAP). Annual report 1992

    SciTech Connect

    Not Available

    1993-03-01

    This report summarizes work performed by Garrett Auxiliary Power Division (GAPD), a unit of Allied-Signal Aerospace Company, during calendar year 1992, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the US Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATTAP). GAPD utilized the AGT101 regenerated gas turbine engine developed under the previous DOE/NASA Advanced Gas Turbine (AGT) program as the ATTAP test bed for ceramic engine technology demonstration. ATTAP focussed on improving AGT101 test bed reliability, development of ceramic design methodologies, and improvement of fabrication and materials processing technology by domestic US ceramics fabricators. A series of durability tests was conducted to verify technology advancements. This is the fifth in a series of technical summary reports published annually over the course of the five-year contract.

  5. Tampa Bay Ecosystem Services Demonstration Project Website: Phase II

    EPA Science Inventory

    The Tampa Bay Ecosystem Services Demonstration Project models the impact of human development and natural stressors on the economic, aesthetic and cultural value of local ecosystems. By linking ecological structures, functions, and condition to the ecosystem services valued by h...

  6. The ethanol heavy-duty truck fleet demonstration project

    SciTech Connect

    1997-06-01

    This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

  7. Radiation safety at the West Valley Demonstration Project

    SciTech Connect

    Hoffman, R.L.

    1997-05-06

    This is a report on the Radiation Safety Program at the West Valley Demonstration Project (WVDP). This Program covers a number of activities that support high-level waste solidification, stabilization of facilities, and decontamination and decommissioning activities at the Project. The conduct of the Program provides confidence that all occupational radiation exposures received during operational tasks at the Project are within limits, standards, and program requirements, and are as low as reasonably achievable.

  8. The Atlanta Public School's Dropout Initiative: A Demonstration Project.

    ERIC Educational Resources Information Center

    Jonas, Edward D., Jr.; Amuleru-Marshall, Nancy

    This project proposes the development and implementation of a model system for collecting, documenting, and reporting to the Atlanta (Georgia) Board of Education information that will indicate the number, ages, and grades of students dropping out of the Atlanta Public School System (APS). Furthermore, this project will demonstrate an effective…

  9. Milliken Clean Coal Demonstration Project: A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-15

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal-utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage.

  10. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  11. MINE WASTE TECHNOLOGY PROGRAM - UNDERGROUND MINE SOURCE CONTROL DEMONSTRATION PROJECT

    EPA Science Inventory

    This report presents results of the Mine Waste Technology Program Activity III, Project 8, Underground Mine Source Control Demonstration Project implemented and funded by the U. S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U. S. Department of E...

  12. Rural Workplace Literacy Demonstration Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    In April 1991, Enterprise State Junior College and MacArthur State Technical College established a rural workplace literacy demonstration project in partnership with adult basic education, seven employers, and a labor organization. The project served 615 persons in classes offered at the 2 colleges, 4 partner locations, and 3 additional worksites.…

  13. ESO Demonstration Project with the NRAO 12-m Antenna

    NASA Astrophysics Data System (ADS)

    Heald, R.; Karban, R.

    2000-03-01

    During the months of September through November 1999, an ALMA joint demonstration project between the European Southern Observatory (ESO) and the National Radio Astronomy Observatory (NRAO) was carried out in Socorro/New Mexico. During this period, Robert Karban (ESO) and Ron Heald (NRAO) worked together on the ESO Demonstration Project. The project integrated ESO software and existing NRAO software (a prototype for the future ALMA control software) to control the motion of the Kitt Peak 12-m antenna. ESO software from the VLT provided the operator interface and coordinate transformation software, while Pat Wallace's TPOINT provided the pointing- model software.

  14. A Demonstration Project: "The Good Life" for Infants and Toddlers.

    ERIC Educational Resources Information Center

    Keister, Mary Elizabeth

    In response to requests for information on a city day-care program, a demonstration project for infants and toddlers, the Demonstration Nursery Center at the University of North Carolina, is reported. Physical makeup of the facilities is described, along with daily procedures and staff activities. To study the effects of day care on babies, a…

  15. Dan Poskevich demonstrates experiment for STS student involvement project

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Dan Poskevich, a college student, demonstrates an experiment he developed for the Space Transportation System (STS) student involvement project. In the aluminum box are thousands of honeybees constructing a honeycomb. Poskevich gave a brief demonstration for news media representatives in the Space Shuttle one-G trainer in JSC's mockup and integration lab.

  16. 78 FR 22527 - TRICARE Access to Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... of the Secretary TRICARE Access to Care Demonstration Project AGENCY: Department of Defense. ACTION: Notice of Extension of the TRICARE South Region United States Coast Guard Access to Care Demonstration... fiscal year to TRICARE authorized Urgent Care Centers without obtaining an authorization from...

  17. LOW SULFUR HOME HEATING OIL DEMONSTRATION PROJECT SUMMARY REPORT.

    SciTech Connect

    BATEY, J.E.; MCDONALD, R.J.

    2005-06-01

    almost the same as predicted by past laboratory studies. Fouling deposition rates are reduced by a factor of two to three by using lower sulfur oil. This translates to a potential for substantial service cost savings by extending the interval between labor-intensive cleanings of the internal surfaces of the heating systems in these homes. In addition, the time required for annual service calls can be lowered, reducing service costs and customer inconvenience. The analyses conducted as part of this field demonstration project indicates that service costs can be reduced by up to $200 million a year nationwide by using lower sulfur oil and extending vacuum cleaning intervals depending on the labor costs and existing cleaning intervals. The ratio of cost savings to added fuel costs is economically attractive based on past fuel price differentials for the lower sulfur product. The ratio of cost savings to added costs vary widely as a function of hourly service rates and the additional cost for lower sulfur oil. For typical values, the expected benefit is a factor of two to four higher than the added fuel cost. This means that for every dollar spent on higher fuel cost, two to four dollars can be saved by lowered vacuum cleaning costs when the cleaning intervals are extended. Information contained in this report can be used by individual oil marketers to estimate the benefit to cost ratio for their specific applications. Sulfur oxide and nitrogen oxide air emissions are reduced substantially by using lower sulfur fuel oil in homes. Sulfur oxides emissions are lowered by 75 percent by switching from fuel 0.20 percent to 0.05 percent sulfur oil. This is a reduction of 63,000 tons a year nationwide. In New York State, sulfur oxide emissions are reduced by 13,000 tons a year. This translates to a total value of $12 million a year in Sulfur Oxide Emission Reduction Credits for an emission credit cost of $195 a ton. While this ''environmental cost'' dollar savings is smaller than

  18. Santa Clara County Planar Solid Oxide Fuel Cell Demonstration Project

    SciTech Connect

    Fred Mitlitsky; Sara Mulhauser; David Chien; Deepak Shukla; David Weingaertner

    2009-11-14

    The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project demonstrated the technical viability of pre-commercial PSOFC technology at the County 911 Communications headquarters, as well as the input fuel flexibility of the PSOFC. PSOFC operation was demonstrated on natural gas and denatured ethanol. The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project goals were to acquire, site, and demonstrate the technical viability of a pre-commercial PSOFC technology at the County 911 Communications headquarters. Additional goals included educating local permit approval authorities, and other governmental entities about PSOFC technology, existing fuel cell standards and specific code requirements. The project demonstrated the Bloom Energy (BE) PSOFC technology in grid parallel mode, delivering a minimum 15 kW over 8760 operational hours. The PSOFC system demonstrated greater than 81% electricity availability and 41% electrical efficiency (LHV net AC), providing reliable, stable power to a critical, sensitive 911 communications system that serves geographical boundaries of the entire Santa Clara County. The project also demonstrated input fuel flexibility. BE developed and demonstrated the capability to run its prototype PSOFC system on ethanol. BE designed the hardware necessary to deliver ethanol into its existing PSOFC system. Operational parameters were determined for running the system on ethanol, natural gas (NG), and a combination of both. Required modeling was performed to determine viable operational regimes and regimes where coking could occur.

  19. BMDO: New Mexico Technology Transfer Demonstration Project. Interim final report

    SciTech Connect

    Not Available

    1993-11-01

    The BMDO-New Mexico Technology Transfer Demonstration Project(BMDO-NM) was a collaborative effort among the national laboratories to identify and evaluate the commercial potential of selected SDI-funded technologies. The project was funded by BMDO (formerly known as the Strategic Defense Initiative Office or SDIO), the Technology Enterprise Division (NM-TED) of the NM Economic Development Division, and the three National Laboratories. The project was managed and supervised by SAGE Management Partners of Albuquerque, and project funding was administered through the University of New Mexico. The BMDO-NM Demonstration Project focused on the development of a process to assist technology developers in the evaluation of selected BMDO technology programs so that commercialization decisions can be made in an accelerated manner. The project brought together BMDO, the NM-TED, the University of New Mexico, and three New Mexico Federal laboratories -- Los Alamos (DOE), Phillips (DOD) and Sandia (DOE). Each national laboratory actively participated throughout the project through its technology transfer offices. New Mexico was selected as the site for the Demonstration Program because of its three national and federal research laboratories engaged in BMDO programs, and the existing relationship among state govemment, the labs, universities and local economic development and business assistance organizations. Subsequent Commercialization and Implementation phases for the selected technologies from LANL and SNL were completed by SAGE and the Project Team. Funding for those phases was provided by the individual labs as well as BMDO and NM-TED in kind services. NM-TED played a proactive role in this New Mexico partnership. Its mandate is to promote technology-based economic development, with a commitment to facilitate the use of technology by industry and business statewide. TED assumed the role of program manager and executing agent for BMDO in this demonstration project.

  20. Residential Energy Efficiency Demonstration: Hawaii and Guam Energy Improvement Technology Demonstration Project

    SciTech Connect

    Earle, L.; Sparn, B.; Rutter, A.; Briggs, D.

    2014-03-01

    In order to meet its energy goals, the Department of Defense (DOD) has partnered with the Department of Energy (DOE) to rapidly demonstrate and deploy cost-effective renewable energy and energy-efficiency technologies. The scope of this project was to demonstrate tools and technologies to reduce energy use in military housing, with particular emphasis on measuring and reducing loads related to consumer electronics (commonly referred to as 'plug loads'), hot water, and whole-house cooling.

  1. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    SciTech Connect

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-15

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables.

  2. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    SciTech Connect

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  3. Final Report - Navajo Electrification Demonstration Project - FY2004

    SciTech Connect

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  4. Project TRREE 2009-2010 Annual Report

    ERIC Educational Resources Information Center

    Atwell, Nedra

    2010-01-01

    Project TRREE (Teacher Recruitment and Retention for Educational Excellence) is a federally funded project conducted by the Kentucky Department of Education. The purpose of the project is to develop a systemic approach to increase the number of highly qualified special education teachers with a focus on recruitment of linguistically, culturally…

  5. ULTRA-CLEAN FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT

    SciTech Connect

    Steve Bergin

    2004-10-18

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: SFP Construction and Fuel Production, Impact of SFP Fuel on Engine Performance, Fleet Testing at WMATA and Denali National Park, Demonstration of Clean Diesel Fuels in Diesel Electric Generators in Alaska, and Economic Analysis. ICRC provided overall project organization and budget management for the project. ICRC held meetings with various project participants. ICRC presented at the Department of Energy's annual project review meeting. The plant began producing fuel in October 2004. The first delivery of finished fuel was made in March of 2004 after the initial start-up period.

  6. Oregon Migrant Health Project; Annual Progress Report 1969.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    In this 1969 annual report, 10 objectives of the Oregon Migrant Health Project--which served approximately 18,400 migrants during the project year--are listed. These objectives relate to providing for diagnostic and medical services, preventive medical services, and dental care, as well as promoting health awareness, education, and improved living…

  7. AN OPTICAL CHARACTER RECOGNITION RESEARCH AND DEMONSTRATION PROJECT.

    ERIC Educational Resources Information Center

    1968

    RESEARCH AND DEVELOPMENT OF PROTOTYPE LIBRARY SYSTEMS WHICH UTILIZE OPTICAL CHARACTER RECOGNITION INPUT HAS CENTERED AROUND OPTICAL PAGE READERS AND DOCUMENT READERS. THE STATE-OF-THE-ART OF BOTH THESE OPTICAL SCANNERS IS SUCH THAT BOTH ARE ACCEPTABLE FOR LIBRARY INPUT PREPARATION. A DEMONSTRATION PROJECT UTILIZING THE TWO TYPES OF READERS, SINCE…

  8. In-place nuclear reactor vessel annealing demonstration project

    SciTech Connect

    Howell, D.

    1994-09-01

    The objective of this paper was a discussion of the proposed annealing demonstration project at the canceled Marble Hill-1 reactor. The discussion, which was a compilation of transparencies on the noted subject, included overall objectives, scope of work, staging of equipment, and analytical objectives. Current status, including funding was summarized.

  9. Rural Workplace Literacy Demonstration Project. Welding Curriculum. Dorsey Trailers, Inc.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This curriculum guide contains workplace-specific instructional materials developed for use in a rural workplace literacy demonstration project, specifically with welders. Contents include a student assessment form, instructional objectives, pre- and posttests, learning activities (some locally developed and some selected from commercially…

  10. Tidd PFBC Demonstration Project: Public final design report

    SciTech Connect

    Not Available

    1992-10-01

    This Public Final Design Report describes the 70 MW(e) Tidd PFBC Demonstration Plant under construction in Brilliant, Ohio. This project is receiving cost-sharing from the US Department of Energy (DOE), and is being administered by the Morgantown Energy Technology Center in accordance with DOE Cooperative Agreement No. DE-FC21-87 MC24132.000. The project is also receiving costsharing from the State of Ohio. This award is being administered by the Ohio Coal Development Office. The Tidd PFBC Demonstration Project is the first utility-scale demonstration project in the US. Its objective is to demonstrate that the Pressurized Fluidized Bed Combustion (PFBC) combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. Detailed design of the plant began in May 1987, leading to the start of construction in April 1988. First coal fire occurred in November 1990, and the three-year test program began in February 1991.

  11. Prioritization of Ecosystem Services Research: Tampa Bay Demonstration Project.

    EPA Science Inventory

    The Tampa Bay Ecosystem Services Demonstration Project (TBESDP) is a component of the U.S. Environmental Protection Agency’s Ecosystem Services Research Program. The principal objectives of TBESDP are (1) to quantify the ecosystem services of the Tampa Bay watershed, (2) to deter...

  12. Bilingual Readiness in Primary Grades; An Early Childhood Demonstration Project.

    ERIC Educational Resources Information Center

    King, Paul E.

    The dual objective of this demonstration project was to show "how the reality of two or more language and ethnic groups present within one integrated classroom could be utilized to develop (1) bilingual readiness in both English-speaking and Spanish-speaking children, and (2) positive attitudes toward and respect for one's own native language and…

  13. Pittsburgh Technical Health Training Institute Demonstration Project; Quarterly Report.

    ERIC Educational Resources Information Center

    Kishkunas, Louis J.

    This fifth quarterly report covers the period June 15, 1967 to December 15, 1967 of a project aimed at demonstrating a faster method of training higly qualified workers for the health field. During this period, nurse aides were trained in a pilot program based upon the educational objectives derived from entry level behavioral specifications…

  14. NRC assessment of the Department of Energy annealing demonstration project

    SciTech Connect

    Jackson, D.A.; Malik, S.N.

    1997-02-01

    Thermal annealing is the only known method for mitigating the effects of neutron irradiation embrittlement in reactor pressure vessel (RPV) steels. In May 1996, the US Department of Energy (DOE) in conjunction with the American Society of Mechanical Engineers, Westinghouse, Cooperheat, Electric Power Research Institute (with participating utilities), Westinghouse Owner`s Group, Consumers Power, Electricite` de France, Duquesne Light and the Central Research Institute of the Electric Power Industry (Japan) sponsored an annealing demonstration project (ADP) at Marble Hill. The Marble Hill Plant, located in Madison, Indiana, is a Westinghouse 4 loop design. The plant was nearly 70% completed when the project was canceled. Hence, the RPV was never irradiated. The paper will present highlights from the NRCs independent evaluation of the Marble Hill Annealing Demonstration Project.

  15. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  16. Power generator design for the billings MHD demonstration project

    SciTech Connect

    Pian, C.C.P.; Kessler, R.; Schmitt, E.W.; Morrison, D.J.

    1993-12-31

    The proposed design of the MHD Power generator for the Billings MHD Demonstration Project is presented. The Billings MHD Demonstration Project, proposed by the MHD Development Corporation (MDC) for the U.S. Department of Energy`s Clean Coal Technology V Program, will demonstrate the significant environmental advantages and efficiency potential of MHD electric power generation. A diagonally-loaded, supersonic MHD generator channel is proposed. The generator channel has a thermal input of 250 MW, is 11 meters long and produces 28.5 MW gross power output at the nominal design operating condition. The gasdynamic, gas-side, and mechanical designs of the proposed generator are derived from the design of the 50 MW{sub t} proof-of-concept MHD generator, currently undergoing long duration testing at the CDIF test facility. The design and operation of the proposed generator will be typical of those anticipated in future commercial MHD generator channels.

  17. Kalispel Resident Fish Project : Annual Report, 2002.

    SciTech Connect

    Andersen, Todd; Olson, Jason

    2003-03-01

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  18. Kalispel Resident Fish Project Annual Report, 2003.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2004-04-01

    In 2003 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2003, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented.

  19. McIntosh Unit 4 PCFB demonstration project

    SciTech Connect

    Dodd, A.M.; Dryden, R.J.; Morehead, H.T.

    1997-12-31

    The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured into three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.

  20. FY 2014 LDRD Annual Report Project Summaries

    SciTech Connect

    Tomchak, Dena

    2015-02-01

    The FY 2014 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support future DOE missions and national research priorities. LDRD is essential to INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enahnces technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development.

  1. Habitat Demonstration Unit Project Leadership and Management Strategies

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  2. Fish & Wildlife Annual Project Summary, 1983.

    SciTech Connect

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  3. Rod consolidation at the West Valley Demonstration Project

    SciTech Connect

    Bailey, W.J.

    1986-12-01

    A rod consolidation demonstration with irradiated pressurized water reactor fuel was recently conducted by personnel from Nuclear Assurance Corporation and West Valley Nuclear Services Company at the West Valley Demonstration Project in West Valley, New York. The rod consolidation demonstration involved pulling all of the fuel rods from six fuel Assemblies. In general, the rod pulling proceeded smoothly. The highest compaction ratio attained was 1:8:1. Among the total of 1074 fuel rods were some known degraded rods (they had collapsed cladding, a result of in-reactor fuel densification), but no rods were broken or dropped during the demonstration. One aim was to gather information on the effect of rod consolidation operations on the integrity of the fuel rods during subsequent handling and storage. Another goal was to collect information on the condition and handling of intact, damaged, and failed fuel that has been in storage for an extended period. 9 refs., 8 figs., 1 tab.

  4. Expedited Technology Demonstration Project Baseline Revision 3.0

    SciTech Connect

    Adamson, M.G.; Densley, P.J.

    1996-10-01

    The Expedited Technology Demonstration Project Plan, MWNT Revised Baseline 3.0, replaces and significantly modifies the current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is shown. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in FY97, followed by the activation of final forms in FY98.

  5. FINDING SOLUTIONS AT THE WEST VALLEY DEMONSTRATION PROJECT

    SciTech Connect

    Drake, John L.; Gramling, James M.; Houston, Helene M.

    2003-02-27

    The United States Department of Energy Office of Environmental Management (DOE-EM) faces a number of sizeable challenges as it begins to transform its mission from managing risk to reducing and eliminating risk throughout the DOE Complex. One of the greatest challenges being addressed by DOE-EM as this transformation takes place is accelerating the deactivation and decommissioning of thousands of facilities within the DOE Complex that were once used to support nuclear-related programs and projects. These facilities are now unused and aging. Finding solutions to complete the cleanup of these aging facilities more safely, efficiently, and effectively while reducing costs is critical to successfully meeting DOE-EM's cleanup challenge. The Large-Scale Demonstration and Deployment Project (LSDDP) of Hot Cells at the West Valley Demonstration Project (WVDP) is a near-term project funded through the DOE's National Energy Technology Laboratory (DOE-NETL) for the specific purpose of identifying, evaluating, demonstrating, and deploying commercially available technologies that are capable of streamlining the cleanup of hot cells in unused facilities while improving worker safety. Two DOE project sites are participating in this LSDDP: the WVDP site in West Valley, New York and the Hanford River Corridor Project (RCP) site in Richland, Washington. The WVDP site serves as the host site for the project. Technologies considered for demonstration and potential deployment at both LSDDP sites are targeted for application in hot cells that require the use of remote and semi-remote techniques to conduct various cleanup-related activities because of high radiation or high contamination levels. These hot cells, the type of cleanup activities being conducted, and technologies selected for demonstration are the main topics discussed in this paper. The range of cleanup-related activities addressed include in-situ characterization, size-reduction, contamination control, decontamination, in

  6. An Optical Demonstration Project For The HESSI Rotating Modulation Collimator

    NASA Astrophysics Data System (ADS)

    Lowe-Schmahl, B.; Schmahl, K.; Mengel, T.; Schmahl, E.

    2000-05-01

    Our 4-7th grade Workshop students made a working prototype of a HESSI rotating modulation collimator (RMC) using PVC pipe, PVC couplers, grid transparencies, a dot matrix (tractor feed) printer, and a slide projector. The idea is to rotate two four-inch long telescopes end-to-end on the same printer roller. Each telescope has two grids and are placed an inch or two apart. They have the same rotational axis and all the grids are parallel. The light beam comes in and hits the imaging telescope. The light going out of it hits a diffusion screen (translucent plastic) and then continues, diffused, into the back-projection telescope. Polaroid film and a modified Polaroid camera sum the back-projection data. The camera is modified by removing the front focusing lens, replacing it with a 4-inch lens, creating a shutter system using layered cardboard and gluing the shutter system to the front of the camera. The shutter system is opened and the film exposed through one complete rotation of the model HESSI Telescope. To our students' amazement a back projection was successfully obtained on the print! The HESSI Telescope Demonstration project provides the impetus for students to stretch their mental boundaries. This project promotes the goals of ``learn one, do one, teach one": 1) Learn one: students must research the field and subject matter for the telescope; 2) Do one: By designing, developing and implementing their project, they are in essence performing valid research, which is the end result of all scientific inquiries; 3) Teach one: By incorporating both written and oral presentations of their projects and through interaction with a scientist and/or engineering mentor, students are given the unique opportunity to experience the peer review process that all scientists and engineers must undergo. We would like to thank the HESSI team of NASA Goddard Space Flight Center for their on-going support of our students' project.

  7. FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT

    SciTech Connect

    Stephen P. Bergin

    2003-04-23

    This project has two primary purposes: (1) Build a small-footprint (SFP) fuel production plant to prove the feasibility of this relatively transportable technology on an intermediate scale (i.e. between laboratory-bench and commercial capacity) and produce as much as 150,000 gallons of hydrogen-saturated Fischer-Tropsch (FT) diesel fuel; and (2) Use the virtually sulfur-free fuel produced to demonstrate (over a period of at least six months) that it can not only be used in existing diesel engines, but that it also can enable significantly increased effectiveness and life of the next-generation exhaust-after-treatment emission control systems that are currently under development and that will be required for future diesel engines. Furthermore, a well-to-wheels economic analysis will be performed to characterize the overall costs and benefits that would be associated with the actual commercial production, distribution and use of such FT diesel fuel made by the process under consideration, from the currently underutilized (or entirely un-used) energy resources targeted, primarily natural gas that is stranded, sub-quality, off-shore, etc. During the first year of the project, which is the subject of this report, there have been two significant areas of progress: (1) Most of the preparatory work required to build the SFP fuel-production plant has been completed, and (2) Relationships have been established, and necessary project coordination has been started, with the half dozen project-partner organizations that will have a role in the fuel demonstration and evaluation phase of the project. Additional project tasks directly related to the State of Alaska have also been added to the project. These include: A study of underutilized potential Alaska energy resources that could contribute to domestic diesel and distillate fuel production by providing input energy for future commercial-size SFP fuel production plants; Demonstration of the use of the product fuel in a heavy

  8. Overview of the MARS Laser Communications Demonstration Project

    NASA Technical Reports Server (NTRS)

    Edward, Bernard L.; Townes, Stephen A.; Bondurant, Roy S.; Scozzafava, Joseph J.; Boroson, Don M.; Parvin, Ben A.; Biswas, Abhijit; Pillsbury, Alan D.; Khatri, Farzana I.; Burnside, Jamie W.

    2003-01-01

    This paper provides an overview of the Mars Laser Communications Demonstration Project, a joint project between NASA s Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). It reviews the strawman designs for the flight and ground segments, the critical technologies required, and the concept of operations. It reports preliminary conclusions from the Mars Lasercom Study conducted at MIT/LL and on additional work done at JPL and GSFC. The lasercom flight terminal will be flown on the Mars Telecom Orbiter (MTO) to be launched by NASA in 2009, and will demonstrate a technology which has the potential of vastly improving NASA s ability to communicate throughout the solar system.

  9. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  10. NASA systems autonomy demonstration project: Advanced automation demonstration of Space Station Freedom thermal control system

    NASA Technical Reports Server (NTRS)

    Dominick, Jeffrey; Bull, John; Healey, Kathleen J.

    1990-01-01

    The NASA Systems Autonomy Demonstration Project (SADP) was initiated in response to Congressional interest in Space station automation technology demonstration. The SADP is a joint cooperative effort between Ames Research Center (ARC) and Johnson Space Center (JSC) to demonstrate advanced automation technology feasibility using the Space Station Freedom Thermal Control System (TCS) test bed. A model-based expert system and its operator interface were developed by knowledge engineers, AI researchers, and human factors researchers at ARC working with the domain experts and system integration engineers at JSC. Its target application is a prototype heat acquisition and transport subsystem of a space station TCS. The demonstration is scheduled to be conducted at JSC in August, 1989. The demonstration will consist of a detailed test of the ability of the Thermal Expert System to conduct real time normal operations (start-up, set point changes, shut-down) and to conduct fault detection, isolation, and recovery (FDIR) on the test article. The FDIR will be conducted by injecting ten component level failures that will manifest themselves as seven different system level faults. Here, the SADP goals, are described as well as the Thermal Control Expert System that has been developed for demonstration.

  11. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    SciTech Connect

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  12. Childhood Obesity Research Demonstration Project: Cross-Site Evaluation Methods

    PubMed Central

    Lee, Rebecca E.; Mehta, Paras; Thompson, Debbe; Bhargava, Alok; Carlson, Coleen; Kao, Dennis; Layne, Charles S.; Ledoux, Tracey; O'Connor, Teresia; Rifai, Hanadi; Gulley, Lauren; Hallett, Allen M.; Kudia, Ousswa; Joseph, Sitara; Modelska, Maria; Ortega, Dana; Parker, Nathan; Stevens, Andria

    2015-01-01

    Abstract Introduction: The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which the CORD model is associated with changes in behavior, body weight, BMI, quality of life, and healthcare satisfaction in children 2–12 years of age. Design/Methods: The CORD Evaluation Center (EC-CORD) will analyze the pooled data from three independent demonstration projects that each integrate public health and primary care childhood obesity interventions. An extensive set of common measures at the family, facility, and community levels were defined by consensus among the CORD projects and EC-CORD. Process evaluation will assess reach, dose delivered, and fidelity of intervention components. Impact evaluation will use a mixed linear models approach to account for heterogeneity among project-site populations and interventions. Sustainability evaluation will assess the potential for replicability, continuation of benefits beyond the funding period, institutionalization of the intervention activities, and community capacity to support ongoing program delivery. Finally, cost analyses will assess how much benefit can potentially be gained per dollar invested in programs based on the CORD model. Conclusions: The keys to combining and analyzing data across multiple projects include the CORD model framework and common measures for the behavioral and health outcomes along with important covariates at the individual, setting, and community levels. The overall objective of the comprehensive evaluation will develop evidence-based recommendations for replicating and disseminating community-wide, integrated public health and primary care programs based on the CORD model. PMID:25679060

  13. Advanced Coal Conversion Process Demonstration Project. Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  14. LLNL NESHAPs project 1997 annual report

    SciTech Connect

    Gallegos, G.M.

    1998-06-01

    NESHAP`s limits the emission of radionuclides to the ambient air from DOE facilities to levels resulting in an annual effective dose equivalent (EDE) of 10 mrem (100 ({mu}Sv) to any member of the public The EDEs for the Lawrence Livermore National Laboratory (LLNL) site- wide maximally exposed members of the public from 1997 operations were Livermore site. 0 097 mrem (0 97 {mu}Sv) (80% from point-source emissions), 20% from diffuse-source emissions), Site 300 0 014 mrem (O 14 {mu}Sv) (38% from point-source emissions, 62% from diffuse-source emissions) The EDEs were generally calculated using the EPA-approved CAP88-PC air- dispersion/dose-assessment model Site-specific meteorological data, stack flow data, and emissions estimates based on radionuclide inventory data or continuous-monitoring systems data were the specific input to CAP88-PC for each modeled source.

  15. LLNL NESHAPs project. 1992 annual report

    SciTech Connect

    Surano, K.A.; Failor, R.A.; Biermann, A.H.; Berger, R.L.; Harrach, R.J.

    1993-05-01

    This report summarizes work conducted during FY 1992 for the Environmental Monitoring and Analysis Division of the Environmental Protection Department at Lawrence Livermore National Laboratory (LLNL). This document contains information regarding environmental monitoring of a wide variety of radioisotopes which are emitted to the atmosphere. These radioisotopes include transuranics, biomedical tracers, tritium, mixed fission products, and other radioisotopes used for general research and nuclear weapons research. Information regarding radionuclide air emissions for each of the 56 buildings at LLNL where radionuclides are used or activation products occur is given. Detailed information is included for all point source emissions from 43 LLNL site buildings. In addition, dose equivalents and dose assessment are evaluated. Reported annual releases are based on inventory data and unabated EPA potential release fractions for unmonitored sources, and on actual emission measurements for continuously monitored facilities.

  16. Kalispel Resident Fish Project : Annual Report, 2008.

    SciTech Connect

    Andersen, Todd

    2009-07-08

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  17. PROJECT RE-ED, A DEMONSTRATION PROJECT FOR THE REEDUCATION OF EMOTIONALLY DISTURBED CHILDREN.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Mental Health, Raleigh.

    THE PROJECT FOR THE REEDUCATION OF EMOTIONALLY DISTURBED CHILDREN (PROJECT RE-ED), A DEMONSTRATION PROJECT (1961-1968) TO DEVELOP AND EVALUATE THE EFFECTIVENESS OF RESIDENTIAL SCHOOLS (SUNDAY THROUGH FRIDAY) FOR DISTURBED CHILDREN, IS DESCRIBED. THE PROFESSIONAL TRAINING AT GEORGE PEABODY COLLEGE, TENNESSEE, AND USE OF CAREFULLY SELECTED…

  18. National Writing Project 2008 Annual Report

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2008

    2008-01-01

    Writing in its many forms is the signature means of communication in the 21st century. This simple truth heightens the urgency to help all of our nation's students become strong writers and effective communicators. The National Writing Project (NWP) pursues this goal by focusing the knowledge, expertise, and leadership of the nation's educators on…

  19. Air-blown Integrated Gasification Combined Cycle demonstration project

    SciTech Connect

    Not Available

    1991-01-01

    Clean Power Cogeneration, Inc. (CPC) has requested financial assistance from DOE for the design construction, and operation of a normal 1270 ton-per-day (120-MWe), air-blown integrated gasification combined-cycle (IGCC) demonstration plant. The demonstration plant would produce both power for the utility grid and steam for a nearby industrial user. The objective of the proposed project is to demonstrate air-blown, fixed-bed Integrated Gasification Combined Cycle (IGCC) technology. The integrated performance to be demonstrated will involve all the subsystems in the air-blown IGCC system to include coal feeding; a pressurized air-blown, fixed-bed gasifier capable of utilizing caking coal; a hot gas conditioning systems for removing sulfur compounds, particulates, and other contaminants as necessary to meet environmental and combustion turbine fuel requirements; a conventional combustion turbine appropriately modified to utilize low-Btu coal gas as fuel; a briquetting system for improved coal feed performance; the heat recovery steam generation system appropriately modified to accept a NO{sub x} reduction system such as the selective catalytic reduction process; the steam cycle; the IGCC control systems; and the balance of plant. The base feed stock for the project is an Illinois Basin bituminous high-sulfur coal, which is a moderately caking coal. 5 figs., 1 tab.

  20. The Plasma Hearth Process demonstration project for mixed waste treatment

    SciTech Connect

    Geimer, R.; Dwight, C.; McClellan, G.

    1994-07-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Integrated Program (MWIP). Testing to date has yielded encouraging results in displaying potential applications for the PHP technology. Early tests have shown that a wide range of waste materials can be readily processed in the PHP and converted to a vitreous product. Waste materials can be treated in their original container as received at the treatment facility, without pretreatment. The vitreous product, when cooled, exhibits excellent performance in leach resistance, consistently exceeding the Environmental Protection Agency (EPA) Toxicity Characteristic Leaching Procedure (TCLP) requirements. Performance of the Demonstration System during test operations has been shown to meet emission requirements. An accelerated development phase, being conducted at both bench- and pilot-scale on both nonradioactive and radioactive materials, will confirm the viability of the process. It is anticipated that, as a result of this accelerated technology development and demonstration phase, the PHP will be ready for a final field-level demonstration within three years.

  1. Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project

    SciTech Connect

    Bigelow, Erik

    2013-01-01

    The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-­hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-based energy recovery and storage system. This technology is being developed at TDI’s facilities to capture and reuse the energy necessary for the company’s core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries

  2. Customer-focused planning: Demonstration project summaries. Final report

    SciTech Connect

    George, S.S.

    1992-12-01

    To succeed in the increasingly competitive and dynamic markets in which they operate, electric utilities are focusing ever greater attention on understanding and meeting customer needs. EPRI`s Customer Focused Planning (CFP) project was established to develop concepts and tools that will help utilities enhance their commitment to customer service. The project team conducted a series of interviews and meetings with participating utilities to collaboratively implement crucial steps in the CFP process. Although there is no unique set of tools or single management approach for improving product and service delivery, customer-focused companies have at least five ideals in common. They (1) define goals and objectives in concrete terms, (2) extend the planning boundaries of the organization to include all members of the energy services infrastructure, (3) painstakingly link functional activities directly to customer needs, (4) incorporate the customer`s voice in new product/ service design, and (5) align performance measures with customer needs. In addition, customer-focused companies use a variety of methods to improve customer satisfaction and company performance. These methods include conducting market research, developing market processes such as demand-side management contracting or bidding to reveal customer preferences, and involving customers more directly in the planning process. This report summarizes two brief demonstration projects conducted as part of EPRI`s CFP project, one at Commonwealth Edison Company (CECo) and one at PSI Energy. The CECo project emphasized developing customer-focused performance measures for telephone inquiries. The PSI Energy project involved a one-day workshop underscoring two important CFP elements-understanding customer wants and explicitly linking those wants to utility activities.

  3. Emergency contraception: preliminary report of a demonstration and evaluation project.

    PubMed

    Petitti, D B; Harvey, S M; Preskill, D; Beckman, L J; Postlethwaite, D; Switzky, H; Sherman, C

    1998-01-01

    Kaiser Permanente Southern California and the Pacific Institute for Women's Health began a demonstration and evaluation project on emergency contraceptive pills (ECPs) in the summer of 1996 with the goal of evaluating the feasibility and acceptability of ECPs in a large health maintenance organization and developing institutional templates, provider training and patient education materials that could be used to replicate the project. The ECP program had six components: repackaging of oral contraceptives in an ECP "kit," development of provider education materials, development of patient education materials, in-service training, making ECPs kits available in convenient locations, and development of materials to support replication of the project inside and outside Kaiser Permanente. Although data are still being analyzed, preliminary results are promising. The success of the project within this relatively conservative, but well-established medical care organization provides a model for others. The development of a standard set of educational materials and approaches to implementation should facilitate dispensing ECPs in other settings. PMID:9859634

  4. Diesel fueled ship propulsion fuel cell demonstration project

    SciTech Connect

    Kumm, W.H.

    1996-12-31

    The paper describes the work underway to adapt a former US Navy diesel electric drive ship as a 2.4 Megawatt fuel cell powered, US Coast Guard operated, demonstrator. The Project will design the new configuration, and then remove the four 600 kW diesel electric generators and auxiliaries. It will design, build and install fourteen or more nominal 180 kW diesel fueled molten carbonate internal reforming direct fuel cells (DFCs). The USCG cutter VINDICATOR has been chosen. The adaptation will be carried out at the USCG shipyard at Curtis Bay, MD. A multi-agency (state and federal) cooperative project is now underway. The USCG prime contractor, AEL, is performing the work under a Phase III Small Business Innovation Research (SBIR) award. This follows their successful completion of Phases I and II under contract to the US Naval Sea Systems (NAVSEA) from 1989 through 1993 which successfully demonstrated the feasibility of diesel fueled DFCs. The demonstrated marine propulsion of a USCG cutter will lead to commercial, naval ship and submarine applications as well as on-land applications such as diesel fueled locomotives.

  5. Project LIFE Annual Report, September 1, 1972-August 31, 1973.

    ERIC Educational Resources Information Center

    Pfau, Glen S.

    Presented is the annual (contract year 1972-73) report of Project LIFE (Language Improvement to Facilitate Education), a program to develop an instructional system to assist handicapped preschool and elementary aged children to acquire a functional language system. The prime teaching modality of the program is explained to be the filmstrip which…

  6. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Annual listing of obligated projects. 450.332 Section 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332...

  7. Education North Evaluation Project. The First Annual Report.

    ERIC Educational Resources Information Center

    Ingram, E. J.; McIntosh, R. G.

    The first annual report and evaluation of Education North (a project designed to encourage parents, community members, and teachers in small, isolated, primarily Native and Metis communities in northern Alberta to work together to meet the educational needs of all community members) concentrates on the inner workings of the organizations (local…

  8. Annual Energy Outlook 2009 with Projections to 2030

    SciTech Connect

    2009-03-01

    The Annual Energy Outlook 2009 (AEO2009), prepared by the Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA’s National Energy Modeling System (NEMS). EIA published an “early release” version of the AEO2009 reference case in December 2008.

  9. Demonstrating Robotic Autonomy in NASA's Intelligent Systems Project

    NASA Technical Reports Server (NTRS)

    Morris, Robert; Smith, Ben; Estlin, Tara; Pedersen, Liam

    2004-01-01

    This paper will provide an overview of NASA's investments in autonomy during the past five years within the Intelligent Systems Project, with particular attention paid to investments that have resulted in mission infusion of autonomy technology, in particular, into the recent Mars Exploration Rover (MER) mission. The content of the paper will be divided into two primary topic areas: a technical overview of the component technologies developed under the program, and a programmatic overview of the history and organization of the NASA IS project itself, with a focus on describing the program elements related to autonomy and intelligent robotics. The paper will also provide an overview of the September 2004 autonomy demonstrations, including a discussion of objectives, organization, and preliminary results (to the extent they are available before the submission deadline).

  10. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    NASA Technical Reports Server (NTRS)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  11. Photovoltaic test and demonstration project. [residential energy program

    NASA Technical Reports Server (NTRS)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  12. West Valley Demonstration Project site environmental report, calendar year 1997

    SciTech Connect

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  13. North Village Ground Source Heat Pump Demonstration Project

    SciTech Connect

    Redderson, Jeff

    2015-08-03

    This project demonstrated the feasibility of converting from a traditional direct exchange system to a ground source heat pump system on a large scale, multiple building apartment complex on a university campus. A total of ten apartment buildings were converted using vertical well fields and a ground source loop that connected the 24 apartments in each building into a common system. The system has yielded significant operational savings in both energy and maintenance and transformed the living environments of these residential buildings for our students.

  14. Hudson River PCB reclamation demonstration project, New York

    SciTech Connect

    Not Available

    1982-11-01

    An abstract of the final environmental impact statement (EIS) for a demonstration project to dredge Hudson River sediments to remove polychlorinated biphenyl (PCB) contamination describes an effort to reduce the 40 hot spots by half. Positive impacts would be the removal of potential health hazards, but there is a risk that the dredging operations will release some contaminants into the surrounding water, leaving PCBs in the water and no longer contained. The Federal Water Pollution Control Act of 1972 is the legal mandate for the EIS.

  15. York County Energy Partners DOE CCI ACFB demonstration project

    SciTech Connect

    Wang, S. ); Cox, J.; Parham, D. )

    1992-01-01

    The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world's largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy's Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

  16. York County Energy Partners DOE CCI ACFB demonstration project

    SciTech Connect

    Wang, S.; Cox, J.; Parham, D.

    1992-09-01

    The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world`s largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy`s Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

  17. West Valley Demonstration Project site environmental report, calendar year 1999

    SciTech Connect

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  18. West Valley Demonstration Project site environmental report calendar year 1998

    SciTech Connect

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  19. Nucla circulating atmospheric fluidized bed demonstration project. Final report

    SciTech Connect

    Not Available

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute`s decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  20. Brief History of the Lightcraft Technology Demonstrator (LTD) Project

    NASA Astrophysics Data System (ADS)

    Myrabo, Leik N.

    2003-05-01

    This paper presents a brief history of the laser lightcraft research and development project that lead to the first outdoor free-flight demonstrations for the U.S. government on November 1997 - using the 10 kW PLVTS CO2 laser at the High Energy Laser Systems Test Facility (HELSTF), White Sands Missile Range (WSMR), NM. Summarized herein are some of the technological milestones that brought the Lightcraft Technology Demonstrator (LTD) concept vehicle to its present state of development: 1) from the initial LTD conceptual design, systems integration, and performance analysis for the Strategic Defense Initiative Organization (SDIO) 2) through laboratory engine bench testing, indoor wire-guided and vertical free-flight testing phases under contract to NASA and the USAF; and 3) finally resulting in outdoor flights to the current record altitude of 71 meters (233 ft) on 2 October 2000, sponsored by the Foundation for International Non-governmental Development of Space (FINDS).

  1. Texas LPG fuel cell development and demonstration project

    SciTech Connect

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units. For further

  2. Development of derived investigation levels for use in internal dosimetry at the West Valley Demonstration Project

    SciTech Connect

    Johnson, P.

    1991-12-31

    The objective was to determine if the routine intemal dosimetry program at the West Valley Demonstration Project is capable of meeting the performance objective of 1 mSv annual effective dose equivalent due to internal contamination. With the use of the computer code REMedy the annual effective dose equivalent is calculated. Some of the radionuclides of concern result in an annual effective dose equivalent that exceeds the performance objective. Although the results exceed the performance objective, in all but two cases they do not exceed the US DOE regulatory limits. In these instances the Th-232 and Am-241 were determined to exceed the committed dose equivalent limit to their limiting tissue. In order to document the potential missed dose for regulatory compliance, Sr-90 is used as an indicator for Th-232. For Am-241 an investigation as to whether or not the minimum detectable amount can be lowered is performed. The derived investigation levels as a result of this project are 4.9E3 Bq/lung count for Co-60, 2.2E4 Bq/lung count for Cs-137, 1.9 Bq/1 for Sr-90 and for radionuclides other than Sr-90 any value greater than or equal to three standard deviations above their net count is considered to require further investigation.

  3. Demonstration of Autonomous Rendezvous Technology (DART) Project Summary

    NASA Technical Reports Server (NTRS)

    Rumford, TImothy E.

    2003-01-01

    Since the 1960's, NASA has performed numerous rendezvous and docking missions. The common element of all US rendezvous and docking is that the spacecraft has always been piloted by astronauts. Only the Russian Space Program has developed and demonstrated an autonomous capability. The Demonstration of Autonomous Rendezvous Technology (DART) project currently funded under NASA's Space Launch Initiative (SLI) Cycle I, provides a key step in establishing an autonomous rendezvous capability for the United States. DART's objective is to demonstrate, in space, the hardware and software necessary for autonomous rendezvous. Orbital Sciences Corporation intends to integrate an Advanced Video Guidance Sensor and Autonomous Rendezvous and Proximity Operations algorithms into a Pegasus upper stage in order to demonstrate the capability to autonomously rendezvous with a target currently in orbit. The DART mission will occur in April 2004. The launch site will be Vandenburg AFB and the launch vehicle will be a Pegasus XL equipped with a Hydrazine Auxiliary Propulsion System 4th stage. All mission objectives will be completed within a 24 hour period. The paper provides a summary of mission objectives, mission overview and a discussion on the design features of the chase and target vehicles.

  4. Copper Cable Recycling System - The INEEL LSDDP Demonstration Project

    SciTech Connect

    Conner, Craig C; Meservey, Richard Harlan; Rosenberger, S.

    2001-02-01

    The United States Department of Energy (DOE) continually seeks safer and more cost-effective technologies for the deactivation and decommissioning (D&D) of nuclear facilities. The Deactivation and Decommissioning Focus Area (DDFA) and the DOE’s office of Science and Technology (OST) sponsors Large Scale Demonstration and Deployment Projects (LSDDPs). The increasing number of deactivation and decommissioning (D&D) activities at nuclear facilities can generate hundreds of tons of cables per facility consuming valuable resources such as disposal space and copper. Driven by increasing environmental concerns as well as economical pressures there is a developing need for the recycling of the uncontaminated copper. As part of the LSDDP program the NUKEM Copper Cable Recycling System (CCRS) was demonstrated November 1999 at the Idaho National Engineering and Environmental Laboratory (INEEL). This process allows recovering and recycling the uncontaminated copper contained in surface contaminated cables. The NUKEM CCRS was originally developed in Germany for the use during the D&D of commercial power plants. Up to date the CCRS has successfully processed in Germany more than 200 metric tons of contaminated cables resulting in virtually 100% free release of copper under the German standards. A total of 13.5 tons non and surrogate contaminated cables in a wide variety of sizes were successfully processed during the technology demonstration at INEEL. The assessment has demonstrated the mobility and flexibility of this new process.

  5. Residential construction demonstration project, Cycle II: Active ventilation

    SciTech Connect

    Not Available

    1991-01-01

    This report documents the analysis of the performance of natural and mechanical ventilation in Pacific Northwest homes. The analysis was part of Cycle II of the Residential Construction Demonstration Project, sponsored by Bonneville Power Administration (BPA). Since 1986, the Residential Construction Demonstration Project (RCDP) has sponsored the collection of data on energy efficient homes in the Pacific Northwest that comply with these new standards and requirements. Cycle II of RCDP was conducted between September 1987 and April 1990. It concentrated on energy innovations in homes built to the Super Good Cents specification. All of the test homes have electric heat and mechanical ventilation systems. Seven different types of active ventilation systems are represented in the homes. Three of these system types are equipped with heat recovery devices, and are represented in approximately a quarter of the test homes. The potential for both natural and mechanical ventilation was measured. Potential structural leakage was measured by blower door testing. Flow rate and operating time of mechanical ventilation systems were measured with flow hoods and hour meters. Actual ventilation was measured by using a passive tracer gas technique for several weeks during the heating season and at times of normal occupancy.

  6. Residential construction demonstration project, Cycle II: Active ventilation

    SciTech Connect

    Not Available

    1991-12-31

    This report documents the analysis of the performance of natural and mechanical ventilation in Pacific Northwest homes. The analysis was part of Cycle II of the Residential Construction Demonstration Project, sponsored by Bonneville Power Administration (BPA). Since 1986, the Residential Construction Demonstration Project (RCDP) has sponsored the collection of data on energy efficient homes in the Pacific Northwest that comply with these new standards and requirements. Cycle II of RCDP was conducted between September 1987 and April 1990. It concentrated on energy innovations in homes built to the Super Good Cents specification. All of the test homes have electric heat and mechanical ventilation systems. Seven different types of active ventilation systems are represented in the homes. Three of these system types are equipped with heat recovery devices, and are represented in approximately a quarter of the test homes. The potential for both natural and mechanical ventilation was measured. Potential structural leakage was measured by blower door testing. Flow rate and operating time of mechanical ventilation systems were measured with flow hoods and hour meters. Actual ventilation was measured by using a passive tracer gas technique for several weeks during the heating season and at times of normal occupancy.

  7. The WMO Coastal Inundation Forecasting Demonstration Project (CIFDP)

    NASA Astrophysics Data System (ADS)

    Lee, Boram; Resio, Don; Swail, Val; Fakhruddin, Shm; Horsburgh, Kevin

    2014-05-01

    Coastal inundations are an increasing threat to the lives and livelihoods of people living in low-lying, highly-populated coastal areas. According to the World Bank Report 2005, at least 2.6 million people have drowned in coastal inundation, particularly caused by storm surges, over the last 200 years. The purpose of the WMO Coastal Inundation Forecasting Demonstration Project (CIFDP) is to meet the challenges of coastal communities' safety and to support sustainable development through enhancing coastal inundation forecasting and warning systems at the regional scale. Upon completion of national sub-projects of CIFDP, countries will implement an operational system for integrated coastal inundation forecasting and warning, providing an objective basis for coastal disaster (flooding) management; contributing to saving lives, reducing loss of livelihood and property, and enhancing resilience and sustainability in coastal communities. Operation and maintenance of the CIF system would be the responsibility of national operational agencies with a mandate for coastal inundation warnings. The main focus of the CIFDP will be to facilitate the development of efficient forecasting and warning systems for coastal inundation based on robust science and observations: The presentation will describe the scope and the technical framework for CIFDP and describe its implementation in the various sub-projects presently underway.

  8. The Advanced Linked Extended Reconnaissance & Targeting Technology Demonstration project

    NASA Astrophysics Data System (ADS)

    Edwards, Mark

    2008-04-01

    The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing many operational needs of the future Canadian Army's Surveillance and Reconnaissance forces. Using the surveillance system of the Coyote reconnaissance vehicle as an experimental platform, the ALERT TD project aims to significantly enhance situational awareness by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. The project is exploiting important advances made in computer processing capability, displays technology, digital communications, and sensor technology since the design of the original surveillance system. As the major research area within the project, concepts are discussed for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as from beyond line-of-sight systems such as mini-UAVs and unattended ground sensors. Video-rate image processing has been developed to assist the operator to detect poorly visible targets. As a second major area of research, automatic target cueing capabilities have been added to the system. These include scene change detection, automatic target detection and aided target recognition algorithms processing both IR and visible-band images to draw the operator's attention to possible targets. The merits of incorporating scene change detection algorithms are also discussed. In the area of multi-sensor data fusion, up to Joint Defence Labs level 2 has been demonstrated. The human factors engineering aspects of the user interface in this complex environment are presented, drawing upon multiple user group sessions with military surveillance system operators. The paper concludes with Lessons Learned from the project. The ALERT system has been used in a number of C4ISR

  9. Ultra Low Sulfur Home Heating Oil Demonstration Project

    SciTech Connect

    Batey, John E.; McDonald, Roger

    2015-09-30

    This Ultra Low Sulfur (ULS) Home Heating Oil Demonstration Project was funded by the New York State Energy Research and Development Authority (NYSERDA) and has successfully quantified the environmental and economic benefits of switching to ULS (15 PPM sulfur) heating oil. It advances a prior field study of Low Sulfur (500 ppm sulfur) heating oil funded by NYSERDA and laboratory research conducted by Brookhaven National Laboratory (BNL) and Canadian researchers. The sulfur oxide and particulate matter (PM) emissions are greatly reduced as are boiler cleaning costs through extending cleaning intervals. Both the sulfur oxide and PM emission rates are directly related to the fuel oil sulfur content. The sulfur oxide and PM emission rates approach near-zero levels by switching heating equipment to ULS fuel oil, and these emissions become comparable to heating equipment fired by natural gas. This demonstration project included an in-depth review and analysis of service records for both the ULS and control groups to determine any difference in the service needs for the two groups. The detailed service records for both groups were collected and analyzed and the results were entered into two spreadsheets that enabled a quantitative side-by-side comparison of equipment service for the entire duration of the ULS test project. The service frequency for the ULS and control group were very similar and did indicate increased service frequency for the ULS group. In fact, the service frequency with the ULS group was slightly less (7.5 percent) than the control group. The only exception was that three burner fuel pump required replacement for the ULS group and none were required for the control group.

  10. Demonstration of Innovative Applications of Technology for the CT-121 FGD Process. Project Performance Summary, Clean Coal Technology Demonstration Project

    SciTech Connect

    None, None

    2002-08-01

    This project is part of the U.S. Department of Energy's (DOE) Clean Coal Technology Demonstration Program (CCTDP) established to address energy and environmental concerns related to coal use. DOE sought cost-shared partnerships with industry through five nationally competed solicitations to accelerate commercialization of the most promising advanced coal-based power generation and pollution control technologies. The CCTDP, valued at over five billion dollars, has significantly leveraged federal funding by forging effective partnerships founded on sound principles. For every federal dollar invested, CCTDP participants have invested two dollars. These participants include utilities, technology developers, state governments, and research organizations. The project presented here was one of sixteen selected from 55 proposals submitted in 1988 and 1989 in response to the CCTDP second solicitation.

  11. Kalispel Resident Fish Project : Annual Report, 1995.

    SciTech Connect

    Maroney, Joseph; Donley, Christopher; Scott, Jason; Lockwood, Jr., Neil

    1997-06-01

    In 1995 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) initiated the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat trout (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat and population assessments were conducted in seven tributaries of the Box Canyon reach of the Pend Oreille River. Assessments were used to determine the types and quality of habitat that were limiting to native bull trout and cutthroat trout populations. Assessments were also used to determine the effects of interspecific competition within these streams. A bull trout and brook trout (Salvelinus fontinalis) hybridization assessment was conducted to determine the degree of hybridization between these two species. Analysis of the habitat data indicated high rates of sediment and lack of wintering habitat. The factors that contribute to these conditions have the greatest impact on habitat quality for the tributaries of concern. Population data suggested that brook trout have less stringent habitat requirements; therefore, they have the potential to outcompete the native salmonids in areas of lower quality habitat. No hybrids were found among the samples, which is most likely attributable to the limited number of bull trout. Data collected from these assessments were compiled to develop recommendations for enhancement measures. Recommendations for restoration include riparian planting and fencing, instream structures, as well as, removal of non-native brook trout to reduce interspecific competition with native salmonids in an isolated reach of Cee Cee Ah Creek.

  12. AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis

    SciTech Connect

    Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

    2014-02-01

    This report contributes initial findings from an analysis of significant aspects of the gridSMART® Real-Time Pricing (RTP) – Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

  13. Qualitative assessment of agritourism safety guidelines: a demonstration project.

    PubMed

    Tutor-Marcom, Robin; Greer, Annette; Clay, Maria; Ellis, Tammy; Thompson, Tami; Adam-Samura, Esther Seisay

    2013-01-01

    In 2007, the National Children's Center for Rural and Agricultural Health and Safety (NCCRAHS) published Agritourism Health and Safety Guidelines for Children to provide helpful recommendations for protecting the health and safety of children visiting agritourism farms. Supplement A: Policies and Procedures Guide and Supplement B: Worksite Guide were subsequently published in 2009 and provided agritourism farms with checklists to use in reviewing, planning, and implementing their own health and safety practices. In order to better understand what would be required of a farm wishing to implement the guidelines using Supplements A and B, the North Carolina Agromedicine Institute conducted a single-family farm demonstration project with support from the NCCRAHS. The aims of the project were to (1) determine child health and safety risks associated with an existing agritourism farm; (2) determine the cost of making improvements necessary to reduce risks; and (3) use project findings to motivate other agritourism farms, Cooperative Extension agents, and agritourism insurers to adopt or recommend Agritourism Health and Safety Guidelines for Children for their own farms or farms with which they work. At the conclusion of the study, the target farm was in compliance with an average of 86.9% of items in Supplements A and B. Furthermore, 89% of individuals self-identifying as farmers or farm workers and 100% of Cooperative Extension agents and agritourism insurers attending an end-of-project workshop indicated their intent to adopt or recommend Agritourism Health and Safety Guidelines for Children for their own farms or farms with which they work. PMID:23540301

  14. Strengthening global health security capacity--Vietnam demonstration project, 2013.

    PubMed

    Tran, Phu Dac; Vu, Long Ngoc; Nguyen, Hien Tran; Phan, Lan Trong; Lowe, Wayne; McConnell, Michelle S; Iademarco, Michael F; Partridge, Jeffrey M; Kile, James C; Do, Trang; Nadol, Patrick J; Bui, Hien; Vu, Diep; Bond, Kyle; Nelson, David B; Anderson, Lauren; Hunt, Kenneth V; Smith, Nicole; Giannone, Paul; Klena, John; Beauvais, Denise; Becknell, Kristi; Tappero, Jordan W; Dowell, Scott F; Rzeszotarski, Peter; Chu, May; Kinkade, Carl

    2014-01-31

    Over the past decade, Vietnam has successfully responded to global health security (GHS) challenges, including domestic elimination of severe acute respiratory syndrome (SARS) and rapid public health responses to human infections with influenza A(H5N1) virus. However, new threats such as Middle East respiratory syndrome coronavirus (MERS-CoV) and influenza A(H7N9) present continued challenges, reinforcing the need to improve the global capacity to prevent, detect, and respond to public health threats. In June 2012, Vietnam, along with many other nations, obtained a 2-year extension for meeting core surveillance and response requirements of the 2005 International Health Regulations (IHR). During March-September 2013, CDC and the Vietnamese Ministry of Health (MoH) collaborated on a GHS demonstration project to improve public health emergency detection and response capacity. The project aimed to demonstrate, in a short period, that enhancements to Vietnam's health system in surveillance and early detection of and response to diseases and outbreaks could contribute to meeting the IHR core capacities, consistent with the Asia Pacific Strategy for Emerging Diseases. Work focused on enhancements to three interrelated priority areas and included achievements in 1) establishing an emergency operations center (EOC) at the General Department of Preventive Medicine with training of personnel for public health emergency management; 2) improving the nationwide laboratory system, including enhanced testing capability for several priority pathogens (i.e., those in Vietnam most likely to contribute to public health emergencies of international concern); and 3) creating an emergency response information systems platform, including a demonstration of real-time reporting capability. Lessons learned included awareness that integrated functions within the health system for GHS require careful planning, stakeholder buy-in, and intradepartmental and interdepartmental coordination and

  15. The Interdisciplinary Generalist Curriculum Project: A National Medical School Demonstration Project.

    ERIC Educational Resources Information Center

    Kahn, Norman B., Jr.; And Others

    1995-01-01

    The Interdisciplinary Generalist Curriculum Project was developed to encourage schools of medicine and colleges of osteopathic medicine to implement interdisciplinary generalist curricula in the preclinical years. Five sites were competitively established as demonstration projects, and rigorous attention to creating and maintaining an…

  16. The Social Security Administration's Youth Transition Demonstration Projects: Implementation Lessons from the Original Projects

    ERIC Educational Resources Information Center

    Martinez, John; Fraker, Thomas; Manno, Michelle; Baird, Peter; Mamun, Arif; O'Day, Bonnie; Rangarajan, Anu; Wittenburg, David

    2010-01-01

    This report focuses on the seven original Youth Transition Demonstration (YTD) projects selected for funding in 2003. Three of the original seven projects were selected for a national random assignment evaluation in 2005; however, this report only focuses on program operations prior to joining the random assignment evaluation for the three…

  17. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    EPA Science Inventory

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  18. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are special experimental demonstration projects and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  19. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are special experimental demonstration projects and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  20. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are special experimental demonstration projects and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  1. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are special experimental demonstration projects and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  2. A Work Specific Curriculum Project. Special 353 Demonstration Project in Adult Education.

    ERIC Educational Resources Information Center

    Smith, Paula S.

    A demonstration project was conducted in Alabama to create a basic skills workplace curriculum that would assist a local corporation in improving work force productivity. During the 3-year project, a job-specific curriculum was written for Russell Corporation's Skills Training at Russell (STAR) program. The curriculum covered four topics: safety,…

  3. Advanced secondary recovery demonstration for the Sooner Unit. Annual report, October 1992--May 1993

    SciTech Connect

    Sippel, M.; Junkin, J.; Pritchett, R.

    1995-07-01

    The objectives of this project are to demonstrate the effectiveness of a multi-diciplinary approach to targeted infill drilling and improved reservoir management. The first phase involves geophysical, geological, and engineering data acquisition and analysis to identify optimum well sites and to develop a reservoir operations plan. This report summarizes activities concerned with phase I of the Sooner Unit Project.

  4. Northwest Open Automated Demand Response Technology Demonstration Project

    SciTech Connect

    Kiliccote, Sila; Piette, Mary Ann; Dudley, Junqiao

    2010-03-17

    The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides

  5. Demonstration of KHILS two-color IR projection capability

    NASA Astrophysics Data System (ADS)

    Jones, Lawrence E.; Coker, Jason S.; Garbo, Dennis L.; Olson, Eric M.; Murrer, Robert Lee, Jr.; Bergin, Thomas P.; Goldsmith, George C., II; Crow, Dennis R.; Guertin, Andrew W.; Dougherty, Michael; Marler, Thomas M.; Timms, Virgil G.

    1998-07-01

    For more than a decade, there has been considerable discussion about using different IR bands for the detection of low contrast military targets. Theory predicts that a target can have little to no contrast against the background in one IR band while having a discernible signature in another IR band. A significant amount of effort has been invested towards establishing hardware that is capable of simultaneously imaging in two IR bands to take advantage of this phenomenon. Focal plane arrays (FPA) are starting to materialize with this simultaneous two-color imaging capability. The Kinetic Kill Vehicle Hardware-in-the-loop Simulator (KHILS) team of the Air Force Research Laboratory and the Guided Weapons Evaluation Facility (GWEF), both at Eglin AFB, FL, have spent the last 10 years developing the ability to project dynamic IR scenes to imaging IR seekers. Through the Wideband Infrared Scene Projector (WISP) program, the capability to project two simultaneous IR scenes to a dual color seeker has been established at KHILS. WISP utilizes resistor arrays to produce the IR energy. Resistor arrays are not ideal blackbodies. The projection of two IR colors with resistor arrays, therefore, requires two optically coupled arrays. This paper documents the first demonstration of two-color simultaneous projection at KHILS. Agema cameras were used for the measurements. The Agema's HgCdTe detector has responsivity from 4 to 14 microns. A blackbody and two IR filters (MWIR equals 4.2 t 7.4 microns, LWIR equals 7.7 to 13 microns) were used to calibrate the Agema in two bands. Each filter was placed in front of the blackbody one at a time, and the temperature of the blackbody was stepped up in incremental amounts. The output counts from the Agema were recorded at each temperature. This calibration process established the radiance to Agema output count curves for the two bands. The WISP optical system utilizes a dichroic beam combiner to optically couple the two resistor arrays. The

  6. Project Integration Architecture: A Practical Demonstration of Information Propagation

    NASA Technical Reports Server (NTRS)

    Jones, William Henry

    2005-01-01

    One of the goals of the Project Integration Architecture (PIA) effort is to provide the ability to propagate information between disparate applications. With this ability, applications may then be formed into an application graph constituting a super-application. Such a super-application would then provide all of the analysis appropriate to a given technical system. This paper reports on a small demonstration of this concept in which a Computer Aided Design (CAD) application was connected to an inlet analysis code and geometry information automatically propagated from one to the other. The majority of the work reported involved not the technology of information propagation, but rather the conversion of propagated information into a form usable by the receiving application.

  7. Electric G-Van demonstration and commercial assessment project

    SciTech Connect

    Braga, B.D. )

    1992-12-01

    The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

  8. Functional description of the West Valley Demonstration Project Vitrification Facility

    SciTech Connect

    Borisch, R.R.; McMahon, C.L.

    1990-07-01

    The primary objective of the West Valley Demonstration Project (WVDP) is the solidification of approximately 2.1 million liters (560,000 gallons) of high-level radioactive waste (HLW) which resulted from the operation of a nuclear fuel reprocessing plant. Since the original plant was not built to accommodate the processing of waste beyond storage in underground tanks, HLW solidification by vitrification presented numerous engineering challenges. Existing facilities required redesign and conversion to meet their new purpose. Vitrification technology and systems needed to be created and then tested. Equipment modifications, identified from cold test results, were incorporated into the final equipment configuration to be used for radioactive (hot) operations. Cold operations have defined the correct sequence and optimal functioning of the equipment to be used for vitrification and have verified the process by which waste will be solidified into borosilicate glass.

  9. Uranium soils integrated demonstration: Soil characterization project report

    SciTech Connect

    Cunnane, J.C.; Gill, V.R.; Lee, S.Y.; Morris, D.E.; Nickelson, M.D.; Perry, D.L.; Tidwell, V.C.

    1993-08-01

    An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP.

  10. City of Chula Vista hydrogen fuel cell bus demonstration project

    SciTech Connect

    Gustafson, B.; Bamberger, B.

    1996-10-01

    Hydrogen as an energy carrier and fuel has potential for various uses including electricity, commercial, residential, transportation, and industrial. It is an energy carrier that can be produced from a variety of primary sources and potentially can accomplish these various uses while significantly reducing pollution by substituting for or reducing the use of fossil fuels. One of the most immediate and potentially viable roles for hydrogen as an energy carrier will be its use as a transportation fuel, especially in densely populated urban areas where automotive emissions contribute significantly to air pollution. The Department of Energy`s commitment to research and development of hydrogen as an alternative fuel, and California`s Zero Emission Vehicle (ZEV) requirements, both provide the impetus and favorable circumstance for demonstrating hydrogen as a transportation fuel on an urban bus system. The purpose of this project is to demonstrate the feasibility of using solid polymer fuel cells in a hydrogen-powered electric drive system for an urban transit bus application. Fuel cell buses use hydrogen fuel and oxygen from the air to produce electrical power with the only byproduct being pure water. Proton Exchange Membrane (PEM) fuel cells are proposed for this project. Current evidence suggests that fuel cells, which rely on hydrogen and a process known as proton exchange to generate their power, appear to have an infinite life span. All exhaust pollution is completely eliminated, resulting in a Zero Emission Vehicle (ZEV). An urban bus system offers the potential for developing a market for the production of hydrogen propulsion technology due to extensive vehicular use in densely populated areas experiencing pollution from numerous sources, and because the central garaging facilities or the bus system facilitates fueling and maintenance functions.

  11. The advanced linked extended reconnaissance and targeting technology demonstration project

    NASA Astrophysics Data System (ADS)

    Cruickshank, James; de Villers, Yves; Maheux, Jean; Edwards, Mark; Gains, David; Rea, Terry; Banbury, Simon; Gauthier, Michelle

    2007-06-01

    The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing key operational needs of the future Canadian Army's Surveillance and Reconnaissance forces by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. We discuss concepts for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as beyond line-of-sight systems such as a mini-UAV and unattended ground sensors. The authors address technical issues associated with the use of fully digital IR and day video cameras and discuss video-rate image processing developed to assist the operator to recognize poorly visible targets. Automatic target detection and recognition algorithms processing both IR and visible-band images have been investigated to draw the operator's attention to possible targets. The machine generated information display requirements are presented with the human factors engineering aspects of the user interface in this complex environment, with a view to establishing user trust in the automation. The paper concludes with a summary of achievements to date and steps to project completion.

  12. RESOLVE Projects: Lunar Water Resource Demonstration and Regolith Volatile Characterization

    NASA Technical Reports Server (NTRS)

    2008-01-01

    To sustain affordable human and robotic space exploration, the ability to live off the land at the exploration site will be essential. NASA calls this ability in situ resource utilization (ISRU) and is focusing on finding ways to sustain missions first on the Moon and then on Mars. The ISRU project aims to develop capabilities to technology readiness level 6 for the Robotic Lunar Exploration Program and early human missions returning to the Moon. NASA is concentrating on three primary areas of ISRU: (1) excavating, handling, and moving lunar regolith, (2) extracting oxygen from lunar regolith, and (3) finding, characterizing, extracting, separating, and storing volatile lunar resources, especially in the permanently shadowed polar craters. To meet the challenges related to technology development for these three primary focus areas, the Regolith and Environment Science and Oxygen and Lunar Volatile Extraction (RESOLVE) project was initiated in February 2005, through funding by the Exploration Systems Mission Directorate. RESOLVE's objectives are to develop requirements and conceptual designs and to perform breadboard concept verification testing of each experiment module. The final goal is to deliver a flight prototype unit that has been tested in a relevant lunar polar environment. Here we report progress toward the third primary area creating ways to find, characterize, extract, separate, and store volatile lunar resources. The tasks include studying thermal, chemical, and electrical ways to collect such volatile resources as hydrogen, water, nitrogen, methane, and ammonia. We approached this effort through two subtasks: lunar water resource demonstration (LWRD) and regolith volatile characterization (RVC).

  13. Bethlehem Steel Corporation Blast Furnace Granulated Coal Injection Demonstration Project

    SciTech Connect

    Not Available

    1993-05-01

    Construction of the proposed BFGCI system is not expected to have significant impacts on air quality, noise, and land use at the Burns Harbor Plant area. Operation of the proposed BFGCI system is not expected to have significant impacts on the environment at the Burns Harbor Plant area. An increase of approximately 30 tons/yr for NO{sub x} and approximately 13 tons/yr for particulate matter (from the coal storage area) is expected. These emissions are within the currently permitted levels. Carbon dioxide emissions, which are unregulated, would increase by about 220,000 tons/yr at the Burns Harbor Plant. Water withdrawn and returned to Lake Michigan would increase by 1.3 million gal/d (0.4 percent of existing permitted discharge) for non-contact cooling water. No protected species, floodplains, wetlands, or cultural resources would be affected by operation of the proposed facility. Small economic benefits would occur from the creation of 5 or 6 permanent new jobs during the operation of the proposed demonstration project and subsequent commercial operation. Under the No Action Alternative, the proposed project would not receive cost-shared funding support from DOE.

  14. The PMI local site demonstration project: lessons in technical assistance.

    PubMed

    Strand, J; Rosenbaum, J; Hanlon, E; Jimerson, A

    2000-03-01

    This paper presents the lessons that were learned in technical assistance during the Preventive Marketing Initiative local site demonstration project in the US. The program has been ongoing for 5 years, with social marketers from the Academy for Educational Development and Porter Novelli using social marketing and behavioral science principles to develop HIV prevention programs for and with local teens. With the success of the program, community-based prevention programs are increasingly being requested since better outcomes resulted from a few dollars of investment. Likewise, funders and prevention researchers were challenged to transfer state-of-the-art prevention technologies for communities to apply it readily. The success achieved by the project, however, provides important lessons that would save time and money for future community-based Prevention Marketing efforts. Among the lessons were the need to seek out or establish conditions in the community that are conducive to success, as well as the need to offer technical assistance that would mobilize communities in developing more effective Prevention Marketing programs. PMID:12349591

  15. New Mexico State University Campus geothermal demonstration project

    SciTech Connect

    Cuniff, R.A.; Fisher, K.P.; Chintawongvanich, P.

    1984-04-01

    This report presents the design, construction highlights, and performance of the New Mexico State University Campus Geothermal Demonstration Project at Las Cruces, New Mexico. Construction started in July 1981, first system use was January 1982, and the system was dedicated on April 21, 1982. Included herein are summary observations after two years of use. The geothermal hot water from New Mexico State University wells is used to heat potable water, which in turn provides 83 percent of the domestic hot water on the New Mexico State University campus, as well as space heat to two buildings, and for two heated swimming pools. The original system is providing service to 30 total buildings, with two additional buildings (150,000 square feet) in process of geothermal conversion.) The system overall performance has been excellent, except for geothermal well pump problems. In terms of operating efficiency, the system has exceeded the design parameters. In spite of abnormally high costs for well and pump repairs, the system has shown a positive cost avoidance of more than $118,000 for the first year of operation. For the first two full years of operation, the system has produced a net positive cost avoidance of more than $200,000. Payback on the total investment of $1,670,000 is projected to be 6 to 10 years, depending on the future prices of natural gas and electricity.

  16. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-31

    The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO{sub 2} emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO{sub 2} removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge.

  17. Locomotive Emission and Engine Idle Reduction Technology Demonstration Project

    SciTech Connect

    John R. Archer

    2005-03-14

    In response to a United States Department of Energy (DOE) solicitation, the Maryland Energy Administration (MEA), in partnership with CSX Transportation, Inc. (CSXT), submitted a proposal to DOE to support the demonstration of Auxiliary Power Unit (APU) technology on fifty-six CSXT locomotives. The project purpose was to demonstrate the idle fuel savings, the Nitrous Oxide (NOX) emissions reduction and the noise reduction capabilities of the APU. Fifty-six CSXT Baltimore Division locomotives were equipped with APUs, Engine Run Managers (ERM) and communications equipment to permit GPS tracking and data collection from the locomotives. Throughout the report there is mention of the percent time spent in the State of Maryland. The fifty-six locomotives spent most of their time inside the borders of Maryland and some spent all their time inside the state borders. Usually when a locomotive traveled beyond the Maryland State border it was into an adjoining state. They were divided into four groups according to assignment: (1) Power Unit/Switcher Mate units, (2) Remote Control units, (3) SD50 Pusher units and (4) Other units. The primary data of interest were idle data plus the status of the locomotive--stationary or moving. Also collected were main engine off, idling or working. Idle data were collected by county location, by locomotive status (stationary or moving) and type of idle (Idle 1, main engine idling, APU off; Idle 2, main engine off, APU on; Idle 3, main engine off, APU off; Idle 4, main engine idle, APU on). Desirable main engine idle states are main engine off and APU off or main engine off and APU on. Measuring the time the main engine spends in these desirable states versus the total time it could spend in an engine idling state allows the calculation of Percent Idle Management Effectiveness (%IME). IME is the result of the operation of the APU plus the implementation of CSXT's Warm Weather Shutdown Policy. It is difficult to separate the two. The units

  18. INTEGRATED GASIFICATION COMBINED CYCLE PROJECT 2 MW FUEL CELL DEMONSTRATION

    SciTech Connect

    FuelCell Energy

    2005-05-16

    With about 50% of power generation in the United States derived from coal and projections indicating that coal will continue to be the primary fuel for power generation in the next two decades, the Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCTDP) has been conducted since 1985 to develop innovative, environmentally friendly processes for the world energy market place. The 2 MW Fuel Cell Demonstration was part of the Kentucky Pioneer Energy (KPE) Integrated Gasification Combined Cycle (IGCC) project selected by DOE under Round Five of the Clean Coal Technology Demonstration Program. The participant in the CCTDP V Project was Kentucky Pioneer Energy for the IGCC plant. FuelCell Energy, Inc. (FCE), under subcontract to KPE, was responsible for the design, construction and operation of the 2 MW fuel cell power plant. Duke Fluor Daniel provided engineering design and procurement support for the balance-of-plant skids. Colt Engineering Corporation provided engineering design, fabrication and procurement of the syngas processing skids. Jacobs Applied Technology provided the fabrication of the fuel cell module vessels. Wabash River Energy Ltd (WREL) provided the test site. The 2 MW fuel cell power plant utilizes FuelCell Energy's Direct Fuel Cell (DFC) technology, which is based on the internally reforming carbonate fuel cell. This plant is capable of operating on coal-derived syngas as well as natural gas. Prior testing (1992) of a subscale 20 kW carbonate fuel cell stack at the Louisiana Gasification Technology Inc. (LGTI) site using the Dow/Destec gasification plant indicated that operation on coal derived gas provided normal performance and stable operation. Duke Fluor Daniel and FuelCell Energy developed a commercial plant design for the 2 MW fuel cell. The plant was designed to be modular, factory assembled and truck shippable to the site. Five balance-of-plant skids incorporating fuel processing, anode gas oxidation, heat recovery, water

  19. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethylether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operation in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work

  20. Community ownership and program continuation following a health demonstration project.

    PubMed

    Bracht, N; Finnegan, J R; Rissel, C; Weisbrod, R; Gleason, J; Corbett, J; Veblen-Mortenson, S

    1994-06-01

    Community ownership and maintenance of heart health programs was a major study goal of the Minnesota Heart Health Program (MHHP), a community-based National Heart, Blood and Lung Institute (NIH)-funded demonstration project. A partnership between the University of Minnesota and three Upper Midwest intervention communities was initiated in 1981. Local citizen boards were instrumental in planning, implementing and incorporating programs. Through an 8 year process of community organization, training and volunteer involvement, MHHP educational program responsibility was transferred to existing community-based groups and organizations. In 1989, when federal funding was withdrawn, 70% of all heart health intervention programs initiated by MHHP were being continued by local sponsors and supported by local funds. By 1992, maintenance of programs had decreased to an average 60%. Differential results of program incorporation among the three intervention communities are presented including findings on community sectors that most frequently sponsored programs. Factors that facilitate or impede local ownership are discussed. Research on longer-term maintenance of heart health programs in the three communities continues. PMID:10150448

  1. Denver Potable Water Reuse Demonstration Project: comprehensive chronic rat study.

    PubMed

    Condie, L W; Lauer, W C; Wolfe, G W; Czeh, E T; Burns, J M

    1994-11-01

    The health effects testing program for the Denver Water Department's Potable Water Reuse Demonstration Project was designed to evaluate the relative health effects of highly treated reclaimed water derived from secondary wastewater in comparison with Denver's present high-quality drinking water. The 1 x 10(6) gal/day treatment plant provided 500-fold concentrates of water that had been treated by multiple processes to remove microbial and chemical contaminants. Fischer 344 rats were exposed to the complex mixture solutions for up to 2 yr to evaluate chronic toxicity and oncogenicity effects. The following parameters were evaluated: clinical observations, survival rate, growth, food and water consumption, haematology, clinical chemistry, urinalysis, organ weights, gross autopsy and histopathological examination of all lesions, major tissues and organs. Clinical pathology, gross pathology, and microscopic pathology conducted at wk 26 and 65 and at the end of the study did not reveal any findings that could be considered to be treatment related. Administration of drinking water concentrates at up to 500 times the original concentration in the original water samples to F344 rats for up to 104 wk did not result in any overt toxicological or carcinogenic effects. PMID:7959456

  2. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    SciTech Connect

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  3. Town of Edinburg landfill reclamation demonstration project. Final report

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  4. The Ambulatory Care Medical Audit Demonstration Project. Research design.

    PubMed

    Palmer, R H; Hargraves, J L

    1996-09-01

    The authors describe the design of and statistical analyses involved in the Ambulatory Care Medical Audit Demonstration Project, which tested feasibility, cost, and effectiveness of cycles that met quality assurance requirements in eight pediatric and eight general medicine group practices at four teaching hospitals and six health centers. The authors used a concurrent crossover design using randomized cycles of quality assurance so that a practice was a control site for one guideline and an experimental site for another. For 12 months before and 18 months during and after quality assurance experimental interventions, the authors measured practitioner conformance to review criteria for patient-care guidelines believed to improve outcomes, including four internal medicine patient-care guidelines (ie, follow-up of low hematocrit, cancer screening for women, follow-up of high serum glucose, and monitoring of patients treated with digoxin) and four pediatric patient-care guidelines (ie, follow-up of positive urine cultures, screening for disease and immunizing infants, management of acute gastroenteritis, and management of acute ear infection). The authors distinguished review criteria whose performance depended on personal efforts of practitioners from those that concerned performance dependent on the practice's system for reporting test results and calling patients to return for care. PMID:8792786

  5. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the

  6. Environmental Assessment for the Accelerated Tank Closure Demonstration Project

    SciTech Connect

    N /A

    2003-06-16

    The U.S. Department of Energy's (DOE) Office of River Protection (ORP) needs to collect engineering and technical information on (1) the physical response and behavior of a Phase I grout fill in an actual tank, (2) field deployment of grout production equipment and (3) the conduct of component closure activities for single-shell tank (SST) 241-C-106 (C-106). Activities associated with this Accelerated Tank Closure Demonstration (ATCD) project include placement of grout in C-106 following retrieval, and associated component closure activities. The activities will provide information that will be used in determining future closure actions for the remaining SSTs and tank farms at the Hanford Site. This information may also support preparation of the Environmental Impact Statement (EIS) for Retrieval, Treatment, and Disposal of Tank Waste and Closure of Single-Shell Tanks at the Hanford Site, Richland, Washington (Tank Closure EIS). Information will be obtained from the various activities associated with the component closure activities for C-106 located in the 241-C tank farm (C tank farm) under the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and the Hanford Federal Facility Agreement and Consent Order (HFFACO) (Ecology et al. 1989). The impacts of retrieving waste from C-106 are bounded by the analysis in the Tank Waste Remediation System (TWRS) EIS (DOE/EIS-0189), hereinafter referred to as the TWRS EIS. DOE has conducted and continues to conduct retrieval activities at C-106 in preparation for the ATCD Project. For major federal actions significantly affecting the quality of the human environment, the ''National Environmental Policy Act of 1969'' (NEPA) requires that federal agencies evaluate the environmental effects of their proposed and alternative actions before making decisions to take action. The President's Council on Environmental Quality (CEQ) has developed regulations for implementing NEPA. These regulations are found in Title 40 of the Code

  7. Project Genesis: Mars in situ propellant technology demonstrator mission

    NASA Technical Reports Server (NTRS)

    Acosta, Francisco Garcia; Anderson, Scott; Andrews, Jason; Deger, Matt; Hedman, Matt; Kipp, Jared; Kobayashi, Takahisa; Marcelo, Mohrli; Mark, Karen; Matheson, Mark

    1994-01-01

    Project Genesis is a low cost, near-term, unmanned Mars mission, whose primary purpose is to demonstrate in situ resource utilization (ISRU) technology. The essence of the mission is to use indigenously produced fuel and oxidizer to propel a ballistic hopper. The Mars Landing Vehicle/Hopper (MLVH) has an Earth launch mass of 625 kg and is launched aboard a Delta 117925 launch vehicle into a conjunction class transfer orbit to Mars. Upon reaching its target, the vehicle performs an aerocapture maneuver and enters an elliptical orbit about Mars. Equipped with a ground penetrating radar, the MLVH searches for subsurface water ice deposits while in orbit for several weeks. A deorbit burn is then performed to bring the MLVH into the Martian atmosphere for landing. Following aerobraking and parachute deployment, the vehicle retrofires to a soft landing on Mars. Once on the surface, the MLVH begins to acquire scientific data and to manufacture methane and oxygen via the Sabatier process. This results in a fuel-rich O2/CH4 mass ratio of 2, which yields a sufficiently high specific impulse (335 sec) that no additional oxygen need be manufactured, thus greatly simplifying the design of the propellant production plant. During a period of 153 days the MLVH produces and stores enough fuel and oxidizer to make a 30 km ballistic hop to a different site of scientific interest. At this new location the MLVH resumes collecting surface and atmospheric data with the onboard instrumentation. Thus, the MLVH is able to provide a wealth of scientific data which would otherwise require two separate missions or separate vehicles, while proving a new and valuable technology that will facilitate future unmanned and manned exploration of Mars. Total mission cost, including the Delta launch vehicle, is estimated to be $200 million.

  8. Gas Dynamic Spray Technology Demonstration Project Management. Joint Test Report

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2011-01-01

    The standard practice for protecting metallic substrates in atmospheric environments is the use of an applied coating system. Current coating systems used across AFSPC and NASA contain volatile organic compounds (VOCs) and hazardous air pollutants (HAPs). These coatings are sUbject to environmental regulations at the Federal and State levels that limit their usage. In addition, these coatings often cannot withstand the high temperatures and exhaust that may be experienced by Air Force Space Command (AFSPC) and NASA structures. In response to these concerns, AFSPC and NASA have approved the use of thermal spray coatings (TSCs). Thermal spray coatings are extremely durable and environmentally friendly coating alternatives, but utilize large cumbersome equipment for application that make the coatings difficult and time consuming to repair. Other concerns include difficulties coating complex geometries and the cost of equipment, training, and materials. Gas Dynamic Spray (GOS) technology (also known as Cold Spray) was evaluated as a smaller, more maneuverable repair method as well as for areas where thermal spray techniques are not as effective. The technology can result in reduced maintenance and thus reduced hazardous materials/wastes associated with current processes. Thermal spray and GOS coatings also have no VOCs and are environmentally preferable coatings. The primary objective of this effort was to demonstrate GDS technology as a repair method for TSCs. The aim was that successful completion of this project would result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations to improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

  9. A Work Specific Curriculum Project. Special 353 Demonstration Project in Adult Education.

    ERIC Educational Resources Information Center

    Auburn Univ., AL. Dept. of Vocational and Adult Education.

    This document contains samples of work specific curricula for the basic level (I) and advanced level (II) of the safety section of the Auburn University (Alabama) Demonstration project in adult education. The samples consist of instructor manuals and student books. Content of each instructor manual--one for level I and another for level…

  10. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    SciTech Connect

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15 states.

  11. Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project

    SciTech Connect

    2013-12-31

    This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.

  12. 34 CFR 377.1 - What is the Demonstration Projects to Increase Client Choice Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Demonstration Projects to Increase Client... PROJECTS TO INCREASE CLIENT CHOICE PROGRAM General § 377.1 What is the Demonstration Projects to Increase Client Choice Program? The Demonstration Projects to Increase Client Choice Program is designed...

  13. HARD CHROME POLLUTION PREVENTION DEMONSTRATION PROJECT - INTERIM REPORT

    EPA Science Inventory

    In the project, five chromium emission prevention/control devices were tested tha cover the spectrum of prevention/control techniques currently in use in small- and large-size hard chromium electroplating job shops. The Project results show that some of the tested devices had ch...

  14. Eldercare Volunteer Corps Demonstration, A "Project Care" Initiative. Final Report.

    ERIC Educational Resources Information Center

    Kentucky State Dept. for Social Services, Frankfort.

    The goal for this project was to recognize the volunteers at the beginning of the project and to focus on a program to increase the utilization of volunteers in essential service delivery to at-risk persons in the Big Sandy region of eastern Kentucky. A diverse committee made up of business, education, civil leaders, service providers, and…

  15. Northwestern Pennsylvania Cooperative Demonstration Project (High Technology). Process Manual.

    ERIC Educational Resources Information Center

    Indiana Univ. of Pennsylvania. Center for Vocational Personnel Preparation.

    This process manual explains the procedures followed by a project that provided training for employees of manufacturing industries. It also focuses on the project's attainment of two other objectives: (1) helping industry in the target area become more competitive with foreign rivals; and (2) building a network between industry and education. A…

  16. Northwest Open Automated Demand Response Technology Demonstration Project

    SciTech Connect

    Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann

    2009-08-01

    Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) performed a technology demonstration and evaluation for Bonneville Power Administration (BPA) in Seattle City Light's (SCL) service territory. This report summarizes the process and results of deploying open automated demand response (OpenADR) in Seattle area with winter morning peaking commercial buildings. The field tests were designed to evaluate the feasibility of deploying fully automated demand response (DR) in four to six sites in the winter and the savings from various building systems. The project started in November of 2008 and lasted 6 months. The methodology for the study included site recruitment, control strategy development, automation system deployment and enhancements, and evaluation of sites participation in DR test events. LBNL subcontracted McKinstry and Akuacom for this project. McKinstry assisted with recruitment, site survey collection, strategy development and overall participant and control vendor management. Akuacom established a new server and enhanced its operations to allow for scheduling winter morning day-of and day-ahead events. Each site signed a Memorandum of Agreement with SCL. SCL offered each site $3,000 for agreeing to participate in the study and an additional $1,000 for each event they participated. Each facility and their control vendor worked with LBNL and McKinstry to select and implement control strategies for DR and developed their automation based on the existing Internet connectivity and building control system. Once the DR strategies were programmed, McKinstry commissioned them before actual test events. McKinstry worked with LBNL to identify control points that can be archived at each facility. For each site LBNL collected meter data and trend logs from the energy management and control system. The communication system allowed the sites to receive day-ahead as well as day-of DR test event signals. Measurement of DR was

  17. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  18. Solar heating and cooling demonstration project at the Florida Solar Energy Center

    SciTech Connect

    Hankins, J.D.

    1980-02-01

    The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. Information is provided on the system's test, operation, controls, hardware and installation, including detailed drawings. The Center's office building, approximately 5000 square feet of space, with solar air conditioning and heating as a demonstration of the technical feasibility is located just north of Port Canaveral, Florida. The system was designed to supply approximately 70% of the annual cooling and 100% of the heating load. The project provides unique high-temperature, non-imaging, non-tracking, evacuated-tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection.

  19. SNOX demonstration project: Volume 2, Project performance and economics. Final report

    SciTech Connect

    1996-07-01

    The SNOX process, developed by Haldor Topsoe A/S and demonstrated and marketed in North America by ABB Environmental Systems (ABBES), is an innovative process which removes both sulfur dioxide and nitrogen oxides from power plant flue gases. Sulfur dioxide is recovered as high purity, concentrated sulfuric acid and nitrogen oxides are converted to nitrogen gas and water vapor; no additional waste streams are produced. As part of the Clean Coal Technology Program, this project was demonstrated under joint sponsorship from the US Department of Energy, Ohio Coal Development Office, ABBES, Snamprogetti, and Ohio Edison. The project objective was to demonstrate the SO{sub 2}/NO{sub x} reduction efficiencies of the SNOX process on an electric power plant firing high-sulfur Ohio Coal. A 35-MWe demonstration has been conducted on a 108-MWe unit, Ohio Edison`s Niles Plant Unit 2, in Trumbull County, Ohio. The $31.4 million project began site preparation in November 1990 and commenced treating flue gas in March of 1992. A parametric test program has been completed. This report presents a description of the technology, results from the 33 month testing and operation phase, and information from a commercial scale economic evaluation. During the demonstration, the process met or exceeded its design goals of 95% SO{sub 2} removal, 90% NO{sub x} removal, and production of commercial grade (>93.2 wt.%) sulfuric acid. The plant was operated for approximately 8000 hours and produced more than 5600 tons of acid, which was purchased and distributed by a local supplier to end users. Projected economics for a 500 MWe commercial SNOX plant indicate a total capital requirement of 305 $/kW, levelized incremental cost of power at 6.1 mills/kWh, 219 $/ton of SO{sub 2} removed, and 198 $/ton of SO{sub 2}+NO{sub x} removed (all at constant dollars).

  20. EAST BAY WETLAND PROTECTION AND RESTORATION DEMONSTRATION PROJECT MX964238

    EPA Science Inventory

    This project represents the first in a series to protect the East Bay north shoreline from further erosion by installing rigid erosion-control structures. Additionally, intertidal marsh vegetation will be restored behind the breakwaters.

  1. Next Steps for the FCEV Learning Demonstration Project (Presentation)

    SciTech Connect

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-02-01

    This presentation summarizes project goals; vehicle and H2 station deployment status, critical performance compared to targets; highlights of latest vehicle and infrastructure analysis results and progress; learning demo next steps; highlights of partner activities and summary.

  2. Projected changes in the annual wind-wave cycle

    NASA Astrophysics Data System (ADS)

    Stopa, Justin; Hemer, Mark

    2016-04-01

    The uneven distribution of the sun's energy directly and indirectly drives physical atmosphere and ocean processes. This creates intricate spatial patterns within the seasonal cycle where higher order harmonics are seen to play an important role in regional climates. The annual cycle and associated harmonics are the strongest oscillations within the climate system and describe the majority of variance across the oceans. Consequently when studying climate oscillations, it is common practice to remove the seasonal cycle in order to elucidate inter-annual cycles. Furthermore the annual cycle plays an important role in the evolution of other inter-annual oscillations through non-linear coupling (e.g ENSO). Despite the important role of the seasons within the climate system very few studies describe the seasonality with any rigor. Therefore our focus is to describe the higher harmonics linked to the annual cycle and how they are expected to evolve in a changing climate. Using simulations from the Coordinated Ocean Wave Climate Project, the seasonality of multiple mid and end of the 21st century wind-wave climate projections are analyzed relative to historical experiment forced simulations. A comparison of various GCM forced wave simulations to reanalysis datasets reveals that a multi-model ensemble best describes the seasons. This ensemble is used to describe the changes within the wave seasonality. A systematic analysis reveals the primary mode of the seasons is relatively unchanged in the mid and end century. The largest changes occur in the second and third modes. The second mode defines the shift or translation within the seasons while the third mode characterizes relative change between the seasonal extremes (ie sharpening or flattening of the waveform). The relative changes in the second and third modes are not homogeneous and intricate patterns are revealed. Certain regions have sharper contrast in seasonality while other regions have a longer strong season. In

  3. Umatilla River Subbasin Fish Habitat Improvement Project, 1990 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1991-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation of 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  4. Umatilla Basin Habitat Improvement Project; 1990 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1991-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation OF 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  5. Advanced Turbine Technology Applications Project (ATTAP). 1944 Annual report

    SciTech Connect

    1995-06-01

    This report summarizes work performed in development and demonstration of structural ceramics technology for automotive gas turbine engines. At the end of this period, the project name was changed to ``Ceramic Turbine Engine Demonstration Project``, effective Jan. 1995. Objectives are to provide early field experience demonstrating the reliability and durability of ceramic components in a modified, available gas turbine engine application, and to scale up and improve the manufacturing processes for ceramic turbine engine components and demonstrate the application of these processes in the production environment. The 1994 ATTAP activities emphasized demonstration and refinement of the ceramic turbine nozzles in the AlliedSignal/Garrett Model 331-200[CT] engine test bed in preparation for field testing; improvements in understanding the vibration characteristics of the ceramic turbine blades; improvements in critical ceramics technologies; and scaleup of the process used to manufacture ceramic turbine components.

  6. Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan

    SciTech Connect

    1996-07-01

    The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98.

  7. Over the energy edge: Results from a seven year new commercial buildings research and demonstration project

    SciTech Connect

    Piette, M.A.; Nordman, B.; deBuen, O.; Diamond, R.; Codey, B.

    1994-08-01

    Edge was a research oriented demonstration project that began in 1985. Twenty-eight commercial buildings were designed and constructed to use 30% less electricity than a hypothetical simulated baseline building. Average savings from the 18 buildings evaluated with post-occupancy, ``tuned`` simulation models were less, at 17%. The cost-effectiveness of the energy-efficiency measures at six of the 18 projects met the target cost-of-conserved (CCE) energy of 5.6cent/kWh for the total package of measures. The most important reason energy savings were not as great as predicted is that the actual, installed energy-efficiency measures and building characteristics changed from the design assumptions. The cost effectiveness of the measures would have been greater if the baseline was common practice rather than assumptions based on the regional building code. For example, the Energy Edge small offices use about 30% to 50% less energy than comparable new buildings. Savings also would have been greater if commissioning had been included within the program. Future projects should consider lower-cost ``hands-on`` evaluation techniques that provide direct feedback on measure performance based on functional and diagnostic testing, with annual check-ups to ensure persistence of savings.

  8. The Mixed Waste Management Facility: A DOE technology demonstration project

    SciTech Connect

    Adamson, M.G.; Streit, R.D.

    1994-05-01

    The Mixed Waste Management Facility (MWMF) is a national demonstration test bed that will be used to evaluate, at pilot scale, emerging technologies for the effective treatment of low-level radioactive, organic mixed wastes. The treatment technologies will be selected from candidates of advanced processes that have been sufficiently demonstrated in laboratory and bench-scale tests, and most closely meet suitable criteria for demonstration. The primary and initial goal will be to demonstrate technologies that have the potential to effectively treat a selection of organic-based mixed waste streams, currently in storage within the DOE, that list incineration as the best demonstrated available technology (BDAT). In future operations, the facility may also be used to demonstrate technology that addresses a broader range of government, university, medical, and industry needs. The primary objective of the MWMF is to demonstrate integrated mixed-waste processing technologies. While primary treatment processes are an essential component of integrated treatment trains, they are only a part of a fully integrated demonstration.

  9. Educational Voucher Demonstration Archive: Project-Level Documentation.

    ERIC Educational Resources Information Center

    Leinwand (C.M.) Associates, Inc., Newton, MA.

    This report describes the Educational Voucher Demonstration, serves as a guide for its documentation, and offers an extensive bibliography. Part 1 gives background information and summarizes the implementation of the Alum Rock Demonstration based on a transitional voucher model and involving six public schools, each offering at least two distinct…

  10. Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)

    SciTech Connect

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-03-01

    Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

  11. Pataha [Creek] Model Watershed : 1997 Habitat Projects : Annual Progress Report.

    SciTech Connect

    Bartels, Duane

    1998-10-28

    The projects outlined in detail on the attached project reports are a few of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. Up until this year, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and was the main focus of the implementation phase of the watershed plan. These practices are the main focus of the watershed plan to reduce the majority of the sediment entering the stream.

  12. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    SciTech Connect

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  13. Fair Start for Children: Lessons Learned from Seven Demonstration Projects.

    ERIC Educational Resources Information Center

    Larner, Mary, Ed.; And Others

    In the early 1980s, the Ford Foundation launched a grants program called Child Survival/A Fair Start for Children (CS/FS) that addressed issues related to birth and infant health and development among families that were poor and underserved by traditional human services. This book reports on each of seven CS/FS projects, describing the concerns…

  14. Treating substance abuse in primary care: a demonstration project

    PubMed Central

    Ernst, Denise; Miller, William R.; Rollnick, Stephen

    2007-01-01

    Purpose The purpose of this project was to implement the delivery of a full range of substance abuse services in a primary care setting. Implementation and logistical issues including confidentiality and communication are discussed. The delivery of services, types of patients, and contextual and policy factors that influenced project implementation are described. Context Substance use disorders are associated with significant morbidity and mortality worldwide. Patients with alcohol/drug problems frequently present in primary care. Effective and brief treatments are available and recommended for primary care but infrequently implemented. Institutional and provider barriers to implementation have been identified. Data source Project documentation, data from the patient tracking system, and clinical case notes were used for description and analyses. Conclusion Addressing substance abuse problems in primary care is important. Behavioral health professionals with training in substance abuse can provide a range of services that are likely to enhance the quality and quantity of care available to patients. Although contextual factors needed to be addressed, integration of services was manageable and seemed acceptable to both providers and patients in this project. PMID:18043722

  15. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  16. IMPACT: An Early Intervention Demonstration Project. Abbreviated Version.

    ERIC Educational Resources Information Center

    Ungerleider, Steven; Caudill, Barry D.

    Project IMPACT is based on an innovative prevention/community intervention model designed to stem the use of drugs and alcohol in an Oregon school district. A total of 74 teachers, administrators, and community leaders participated in a training session which included didactic and experiential sessions informing participants about the nature and…

  17. Evaluation of the Basic Reading Demonstration Project, 1966-67.

    ERIC Educational Resources Information Center

    Rankin, Paul T., Jr.

    A study was conducted to determine the effectiveness of six approaches to beginning reading instruction (basal, linguistic, phonic, programed reading, i/t/a, and unifon) in schools serving educationally disadvantaged children and to determine the effectiveness of lay aides in project classrooms. Subjects were approximately 4,000 pupils in primary…

  18. SITE DEMONSTRATION OF THE TORONTO HARBOUR COMMISSIONERS SOIL RECYCLING PROJECT

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA), in cooperation with the Toronto Harbour Commissioners (THC), conducted a Superfund InnovativeTechnology Evaluation (SITE) demonstration of the THC Soil Recycle Treatment Train. The treatment train consists of three technologies op...

  19. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    NASA Technical Reports Server (NTRS)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  20. The city of San Diego Environmental Service Department`s Ridgehaven green building demonstration project: Project case study. Final report

    SciTech Connect

    Gottfried, D.A.; Schoichet, E.A.

    1998-05-01

    This case study describes the greening of Ridgehaven, the City of San Diego Environmental Services Department`s (ESD`s) new 73,000 sf{sup 2} headquarters building. The use of green design techniques within the conventional renovation of the existing structure significantly increased energy efficiency and indoor air quality (IAQ), and decreased the project`s environmental impact. Despite the constraining municipal budget, tight time schedule, and mandated public bidding procedures, the design team made energy efficiency, IAQ, and resource efficiency their primary design determinants. In the design phase the team screened materials and systems for environmental impact, and their effect on IAQ. Existing materials and systems were frequently reused, thus salvaging or recycling many items that might have gone to landfill. The design team also addressed the environmental impacts of construction and building operations. The ``Green Building Demonstration Program`` included educational outreach and the creation of a unique Manufacturer`s Partnership Program to highlight the effectiveness of green building products and systems. The evaluation featured computerized energy modeling and life-cycle based financial analysis to optimize the energy system design. The annual average energy consumption is designed to be close to 50% of the energy consumption for a comparable California Title 24 energy code compliant building, thus making it one of the most energy efficient buildings in San Diego.

  1. TREATMENT OF HIGHLY CONTAMINATED GROUNDWATER: A SITE DEMONSTRATION PROJECT

    EPA Science Inventory

    From 9-11/1994, the USEPA conducted a field demonstration of the remediation of highly contaminated groundwater at the Mascolite Superfund site located in Millville, NJ. Besides high concentrations of the major contaminant, methyl methacrylate (MMA), the groundwater also containe...

  2. American Indian Telecommunications Satellite Demonstration Project. Summary Report.

    ERIC Educational Resources Information Center

    Lyndon B. Johnson Space Center, Houston, TX.

    The technical feasibility of voice and television communication within and between tribes, between tribes and federal agencies, and between educational institutions and tribes was demonstrated by broadcasts which took place April 10, 12, and 14, 1978, with equipment located at four sites: Crow Agency, Montana; All- Indian Culture Center, New…

  3. Solar demonstration project in a fast-food restaurant

    NASA Astrophysics Data System (ADS)

    McClenahan, D.

    1980-11-01

    The results of a two-phase program in which the first phase included the successful use of heat reclamation equipment and energy conservation techniques at a typical fast-food restaurant are described. The project's second phase involved the engineering, designing, installation and interfacing of a solar collector system at the facility. The report will help to serve as a guide for other restaurants around the state, and possibly the nation, which wish to install energy saving systems, or adopt energy-saving techniques, geared to their special needs and equipment.

  4. Annual energy outlook 2006 with projections to 2030

    SciTech Connect

    2006-02-15

    The Annual Energy Outlook 2006 (AEO2006), prepared by the Energy Information Administration (EIA), presents long-term forecasts of energy supply, demand, and prices through 2030. The projections are based on results from EIA's National Energy Modeling System (NEMS). The report begins with an 'Overview' summarizing the AEO2006 reference case and comparing it with the AEO2005 reference case. The next section, 'Legislation and Regulations', discusses evolving legislation and regulatory issues, including recently enacted legislation and regulation, such as the Energy Policy Act of 2005, and some that are proposed. 'Issues in Focus' includes a discussion of the basis of EIA's substantial revision of the world oil price trend used in the projections. Other topics examined include: energy technologies on the cusp of being introduced; mercury emissions control technologies; and U.S. greenhouse gas intensity. 'Issues in Focus' is followed by 'Energy Market Trends', which provides a summary of the AEO2006 projections for energy markets. The analysis in AEO2006 focuses primarily on a reference case, lower and higher economic growth cases, and lower and higher energy price cases. In addition, more than 30 alternative cases are included in AEO2006. Complete tables for the five primary cases are provided in Appendixes A through C. Major results from many of the alternative cases are provided in Appendix D. Appendix E briefly describes NEMS and the alternatives cases. 112 figs., 25 tabs., 7 apps.

  5. Annual energy outlook 1999, with projections to 2020

    SciTech Connect

    1998-12-01

    The Annual Energy Outlook 1999 (AEO99) presents midterm forecasts of energy supply, demand, and prices through 2020 prepared by the Energy Information Administration (EIA). The projections are based on results from EIA`s National Energy Modeling System (NEMS). The report begins with an Overview summarizing the AEO99 reference case. The next section, Legislation and Regulations, describes the assumptions made with regard to laws that affect energy markets and discusses evolving legislative and regulatory issues. Issues in Focus discusses current energy issues--the economic decline in East Asia, growth in demand for natural gas, vehicle emissions standards, competitive electricity pricing, renewable portfolio standards, and carbon emissions. It is followed by the analysis of energy market trends. The analysis in AEO99 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present a summary of the reference case forecasts in units of oil equivalence and household energy expenditures. The AEO99 projections are based on Federal, State, and local laws and regulations in effect on July 1, 1998. Pending legislation and sections of existing legislation for which funds have not been appropriated are not reflected in the forecasts. Historical data used for the AEOI99 projections were the most current available as of July 31, 1998, when most 1997 data but only partial 1998 data were available.

  6. Lied Animal Shelter Animal campus Renewable Energy Demonstration Project

    SciTech Connect

    Randy Spitzmesser, AIA

    2005-11-22

    The Animal Shelter campus plan includes a new adoption center coupled with a dog adoption park, a wellness/veterinary technician education center, a show arena, and an addition to the existing shelter that will accommodate all animal control and sheltering for the Las Vegas Valley. The new facility will provide a sophisticated and innovative presentation of the animals to be adopted in an attempt to improve the public's perception of shelter animals. Additionally, the Regional Animal Campus will be a ''green building'', embodying a design intent on balancing environmental responsiveness, resource efficiency and cultural and community sensitivity. Designing an energy-efficient building helps reduce pollution from burning fossil fuels, reduce disturbance of natural habitats for the harvesting of resources and minimizes global warming. The project will be a leader in the use of renewable energy by relying on photovoltaic panels, wind turbines, and solar collectors to produce a portion of the project's energy needs The building will operate more efficiently in comparison to a typical shelter through the use of monitoring and specialized cooling/heating equipment. Windows bringing in natural daylight will reduce the center's demand for electricity.

  7. Green River Formation water flood demonstration project. Final report

    SciTech Connect

    Pennington, B.I.; Dyer, J.E.; Lomax, J.D. |; Deo, M.D.

    1996-11-01

    The objectives of the project were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter core, Formation Micro Imaging (FMI) logs from several wells and Magnetic Resonance Imaging (MRI) logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using high-temperature gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2,000 barrels per day.

  8. Umatilla River Subbasin Fish Habitat Improvement Project, 1989 Annual Report.

    SciTech Connect

    Bailey, Timothy D.

    1989-01-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 17 cooperative lease agreements with private landowners, design and layout of 8.6 miles of Riparian enclosure fence and 3.0 miles of instream structures, development of five fencing contracts and six instream work contracts. Results include implementation of 10 miles of fencing and 3 miles of instream work. Other activities undertaken during this report period are: data collection from 90 habitat monitoring transects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of all age groups on habitat improvement and protection.

  9. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    SciTech Connect

    Dena Tomchak

    2014-03-01

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program proves its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.

  10. Next Generation Luminaire (NGL) Downlight Demonstration Project, Hilton Columbus Downtown

    SciTech Connect

    Davis, R. G.; Perrin, T. E.

    2014-09-30

    At the Hilton Columbus Downtown hotel in Ohio, DOE's Better Buildings Alliance conducted a demonstration of Next Generation Luminaires-winning downlights installed in all guest rooms and suites prior to the hotel's 2012 opening. After a post-occupancy assessment, the LED downlights not only provided the aesthetic appearance and dimming functionality desired, but also provided 50% energy savings relative to a comparable CFL downlight and enabled the lighting power to be more than 20% below that allowed by code.

  11. SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky

    SciTech Connect

    1982-03-01

    The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

  12. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    NASA Astrophysics Data System (ADS)

    Widyolar, Bennett K.

    A solar thermal cooling system using novel non-tracking External Compound Parabolic Concentrators (XCPC) has been built at the University of California, Merced and operated for two cooling seasons. Its performance in providing power for space cooling has been analyzed. This solar cooling system is comprised of 53.3 m2 of XCPC trough collectors which are used to power a 23 kW double effect (LiBr) absorption chiller. This is the first system that combines both XCPC and absorption chilling technologies. Performance of the system was measured in both sunny and cloudy conditions, with both clean and dirty collectors. It was found that these collectors are well suited at providing thermal power to drive absorption cooling systems and that both the coinciding of available thermal power with cooling demand and the simplicity of the XCPC collectors compared to other solar thermal collectors makes them a highly attractive candidate for cooling projects.

  13. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    SciTech Connect

    Justin Coleman

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  14. Demonstration Report: ESTCP UXO Discrimination Study ESTCP PROJECT # MM-0838

    SciTech Connect

    Gasperikova, Erika

    2010-02-15

    In 2003, the Defense Science Board observed: 'The problem is that instruments that can detect the buried UXOs also detect numerous scrap metal objects and other artifacts, which leads to an enormous amount of expensive digging. Typically 100 holes may be dug before a real UXO is unearthed! The Task Force assessment is that much of this wasteful digging can be eliminated by the use of more advanced technology instruments that exploit modern digital processing and advanced multi-mode sensors to achieve an improved level of discrimination of scrap from UXOs.' Significant progress has been made in discrimination technology. To date, testing of these approaches has been primarily limited to test sites with only limited application at live sites. Acceptance of discrimination technologies requires demonstration of system capabilities at real UXO sites under real world conditions. Any attempt to declare detected anomalies to be harmless and requiring no further investigation will require demonstration to regulators of not only individual technologies, but of an entire decision making process. This characterization study was be the second phase in what is expected to be a continuing effort that will span several years. The FY06 Defense Appropriation contained funding for the 'Development of Advanced, Sophisticated, Discrimination Technologies for UXO Cleanup' in the Environmental Security Technology Certification Program (ESTCP). ESTCP responded by conducting a UXO Discrimination Study at the former Camp Sibert, AL. The results of this first demonstration were very encouraging. Although conditions were favorable at this site, a single target of interest (4.2-in mortar) and benign topography and geology, all of the classification approaches demonstrated were able to correctly identify a sizable fraction of the anomalies as arising from non-hazardous items that could be safely left in the ground. To build upon the success of the first phase of this study, ESTCP sponsored a

  15. Real Time Technology Application Demonstration Project Final Report

    SciTech Connect

    Volpe, John; Hampson, Steve; Johnson, Robert L

    2008-09-01

    The work and results described in this final report pertain to the demonstration of real-time characterization technologies applied to potentially contaminated surface soils in and around Area of Concern (AOC) 492 at the Paducah Gaseous Diffusion Plant (PGDP). The work was conducted under the auspices of Kentucky Research Consortium for Energy and Environment (KRCEE). KRCEE was created to support the Department of Energy's (DOE) efforts to complete the expeditious and economically viable environmental restoration of the Paducah Gaseous Diffusion Plant (PGDP), the Western Kentucky Wildlife Management Area (WKWMA), and surrounding areas.

  16. Project thermion: Demonstration of a thermionic heat pipe in microgravity

    NASA Astrophysics Data System (ADS)

    Redd, Frank J.; Powell, George E.

    1992-01-01

    The Idaho National Engineering Laboratory (INEL) is conducting intensive research in the design and development of a small, excore heat-pipe-thermionic space nuclear reactor power system (SEHPTR). Progress in this research effort has identified the need for an in-space flight demostration of a thermionic heat pipe element. The proposed demonstration will examine the performance of such a device and verify its operation in microgravity. This paper focuses on the design of a microsatellite-based technology demonstration experiment to measure the effects of microgravity on the performance of an integrated thermionic heat pipe device in low earth orbit. Two scenarios, THERMION-I and THERMION-II, emerged from the design process. Selection between the two will depend upon yet undermined experiment lifetime requirements. THERMION-I is designed for a long-lifetime (greater than one year) investigation of the operations of the thermionic heat pipe element in low earth orbit. Heat input to the element is furnished by a large mirror which collects solar energy and focuses it into a cavity containing the heat pipe device. THERMION-II is a much more simple design which is utilized for short-term (approximately one day) operation. This experiment remains attached to the Delta II second stage and utilizes energy from 253 kg of alkaline batteries to supply thermal energy to the heat pipe device.

  17. West Valley Demonstration Project full-scale canister impact tests

    SciTech Connect

    Whittington, K.F.; Alzheimer, J.M.; Lutz, C.E.

    1995-09-01

    Five West Valley Nuclear Services (WVNS) high-level waste (HLW) canisters were impact tested during 1994 to demonstrate compliance with the drop test requirements of the Waste Acceptance Product Specifications. The specifications state that the canistered waste form must be able to survive a 7{minus}m (23 ft) drop unbreached. The 10-gauge (0.125 in. wall thickness) stainless steel canisters were approximately 85% filled with simulated vitrified waste and weighed about 2100 kg (4600 lb). Each canister was dropped vertically from a height of 7 m (23 ft) onto an essentially unyielding surface. The integrity of the canister was determined by the application and analysis of strain circles, dimensional measurements, and helium leak testing. The canisters were also visually inspected before and after the drop for physical damage. The results of the impact test verify that the canisters survived the 7{minus}m drops unbreached. Therefore, these results demonstrate that the reference canister meets the drop test specification of the Waste Acceptance Product Specification.

  18. Pinon Pine Power Project. Annual report, January 1--December 31, 1996

    SciTech Connect

    1997-12-31

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit is designated as Tracy Unit No. 4.

  19. Heber geothermal binary demonstration project: Unavailability distributions for principal pumps

    SciTech Connect

    Mulvihill, Robert J.; Cleveland, Edward B.

    1982-04-01

    The purpose of this study has been to review data sources relevant to the failure rate and mean time to repair for the principal pumps of the Heber geothermal project. Based upon that review the distributions of failure rates, repair times and pump unavailability were established. A total of 16 pumps are represented in this study. The method used to develop data distributions has been to first review as many sources of pump data as are currently available. This review was followed by a study of the features of the pumps specified for the Heber installation and the effects of operation and the environment on those features as they relate to anticipated failure rates and repair times. From this, determinations were made for mean failure rate and repair time values appropriate to specific Heber pumps. Range factors are then selected and used to establish the expected variability of the data. Failure rates and repair times were then combined to obtain the unavailability distribution of each type of pump.

  20. BACA Project: geothermal demonstration power plant. Final report

    SciTech Connect

    Not Available

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  1. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1998-1999.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This document contains 22 brief summaries of the progress made by Pennsylvania Adult Education Section 353 Special Demonstration projects in meeting their goals and objectives. For each project, the following information is included: project director and number; purpose; impact; outcomes; conclusions and recommendations; project continuation and…

  2. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    SciTech Connect

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  3. Exercise Countermeasures Demonstration Project During the Lunar-Mars Life Support Test Project Phase 2A

    NASA Technical Reports Server (NTRS)

    Lee, Stuart M. C.; Guilliams, Mark E.; Moore, Alan D., Jr.; Williams, W. Jon; Greenisen, M. C.; Fortney, S. M.

    1998-01-01

    This demonstration project assessed the crew members' compliance to a portion of the exercise countermeasures planned for use onboard the International Space Station (ISS) and the outcomes of their performing these countermeasures. Although these countermeasures have been used separately in other projects and investigations, this was the first time they'd been used together for an extended period (60 days) in an investigation of this nature. Crew members exercised every day for six days, alternating every other day between aerobic and resistive exercise, and rested on the seventh day. On the aerobic exercise days, subjects exercised on an electronically braked cycle ergometer using a protocol that has been previously shown to maintain aerobic capacity in subjects exposed to a space flight analogue. On the resistive exercise days, crew members performed five major multijoint resistive exercises in a concentric mode, targeting those muscle groups and bones we believe are most severely affected by space flight. The subjects favorably tolerated both exercise protocols, with a 98% compliance to aerobic exercise prescription and a 91% adherence to the resistive exercise protocol. After 60 days, the crew members improved their peak aerobic capacity by an average 7%, and strength gains were noted in all subjects. These results suggest that these exercise protocols can be performed during ISS, lunar, and Mars missions, although we anticipate more frequent bouts with both protocols for long-duration spaceflight. Future projects should investigate the impact of increased exercise duration and frequency on subject compliance, and the efficacy of such exercise prescriptions.

  4. Forestry timber typing. Tanana demonstration project, Alaska ASVT. [Alaska

    NASA Technical Reports Server (NTRS)

    Morrissey, L. A.; Ambrosia, V. G.

    1982-01-01

    The feasibility of using LANDSAT digital data in conjunction with topographic data to delineate commercial forests by stand size and crown closure in the Tanana River basin of Alaska was tested. A modified clustering approach using two LANDSAT dates to generate an initial forest type classification was then refined with topographic data. To further demonstrate the ability of remotely sensed data in a fire protection planning framework, the timber type data were subsequently integrated with terrain information to generate a fire hazard map of the study area. This map provides valuable assistance in initial attack planning, determining equipment accessibility, and fire growth modeling. The resulting data sets were incorporated into the Alaska Department of Natural Resources geographic information system for subsequent utilization.

  5. The NASA Seasonal-to-Interannual Prediction Project (NSIPP). [Annual Report for 2000

    NASA Technical Reports Server (NTRS)

    Rienecker, Michele; Suarez, Max; Adamec, David; Koster, Randal; Schubert, Siegfried; Hansen, James; Koblinsky, Chester (Technical Monitor)

    2001-01-01

    The goal of the project is to develop an assimilation and forecast system based on a coupled atmosphere-ocean-land-surface-sea-ice model capable of using a combination of satellite and in situ data sources to improve the prediction of ENSO and other major S-I signals and their global teleconnections. The objectives of this annual report are to: (1) demonstrate the utility of satellite data, especially surface height surface winds, air-sea fluxes and soil moisture, in a coupled model prediction system; and (2) aid in the design of the observing system for short-term climate prediction by conducting OSSE's and predictability studies.

  6. Annual Energy Outlook 2013 with Projections to 2040

    SciTech Connect

    2013-04-01

    The Annual Energy Outlook 2013 (AEO2013), prepared by the U.S. Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2040, based on results from EIA’s National Energy Modeling System. The report begins with an “Executive summary” that highlights key aspects of the projections. It is followed by a “Legislation and regulations” section that discusses evolving legislative and regulatory issues, including a summary of recently enacted legislation and regulations, such as: Updated handling of the U.S. Environmental Protection Agency’s (EPA) National Emissions Standards for Hazardous Air Pollutants for industrial boilers and process heaters; New light-duty vehicle (LDV) greenhouse gas (GHG) and corporate average fuel economy (CAFE) standards for model years 2017 to 2025; Reinstatement of the Clean Air Interstate Rule (CAIR) after the court’s announcement of intent to vacate the Cross-State Air Pollution Rule (CSAPR); and Modeling of California’s Assembly Bill 32, the Global Warming Solutions Act (AB 32), which allows for representation of a cap-and-trade program developed as part of California’s GHG reduction goals for 2020. The “Issues in focus” section contains discussions of selected energy topics, including a discussion of the results in two cases that adopt different assumptions about the future course of existing policies, with one case assuming the elimination of sunset provisions in existing policies and the other case assuming the elimination of the sunset provisions and the extension of a selected group of existing public policies—CAFE standards, appliance standards, and production tax credits. Other discussions include: oil price and production trends in AEO2013; U.S. reliance on imported liquids under a range of cases; competition between coal and natural gas in electric power generation; high and low nuclear scenarios through 2040; and the impact of growth in natural gas

  7. Annual energy outlook 2009 with projections to 2030

    SciTech Connect

    2009-03-15

    The Annual Energy Outlook 2009 (AEO009), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA's National Energy Modeling System (NEMS). EIA published an 'early release' version of the AEO009 reference case in December 2008. The report begins with an 'Executive Summary' that highlights key aspects of the projections. It is followed by a 'Legislation and Regulations' section that discusses evolving legislation and regulatory issues, including a summary of recently enacted legislation, such as the Energy Improvement and Extension Act of 2008 (EIEA2008). The next section, 'Issues in Focus,' contains discussions of selected topics, including: the impacts of limitations on access to oil and natural gas resources on the Federal Outer Continental Shelf (OCS); the implications of uncertainty about capital costs for new electricity generating plants; and the result of extending the Federal renewable production tax credit (PTC). It also discusses the relationship between natural gas and oil prices and the basis of the world oil price and production trends in AEO2009.

  8. Annual energy outlook 1998 with projections to 2020

    SciTech Connect

    1997-12-01

    The Annual Energy Outlook 1998 (AEO98) is the first AEO with projections to 2020. Key issues for the forecast extension are trends in energy efficiency improvements, the effects of increasing production and productivity improvements on energy prices, and the reduction in nuclear generating capacity. Projections in AEO98 also reflect a greater shift to electricity market restructuring. Restructuring is addressed through several changes that are assumed to occur in the industry, including a shorter capital recovery period for capacity expansion decisions and a revised financial structure that features a higher cost of capital as the result of higher competitive risk. Both assumptions tend to favor less capital-intensive generation technologies, such as natural gas, over coal or baseload renewable technologies. The forecasts include specific restructuring plans in those regions that have announced plans. California, New York, and New England are assumed to begin competitive pricing in 1998. The provisions of the California legislation for stranded cost recovery and price caps are incorporated. In New York and New England, stranded cost recovery is assumed to be phased out by 2008.

  9. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Department's Program Effectiveness Panel as defined in 34 CFR 400.4(b). (e) Demonstration and dissemination... key personnel in project management and in fields related to the objectives of the project. For the... application for a demonstration project: (a) Program factors. (10 points) The Secretary reviews...

  10. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Department's Program Effectiveness Panel as defined in 34 CFR 400.4(b). (e) Demonstration and dissemination... key personnel in project management and in fields related to the objectives of the project. For the... application for a demonstration project: (a) Program factors. (10 points) The Secretary reviews...

  11. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Department's Program Effectiveness Panel as defined in 34 CFR 400.4(b). (e) Demonstration and dissemination... key personnel in project management and in fields related to the objectives of the project. For the... application for a demonstration project: (a) Program factors. (10 points) The Secretary reviews...

  12. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Department's Program Effectiveness Panel as defined in 34 CFR 400.4(b). (e) Demonstration and dissemination... key personnel in project management and in fields related to the objectives of the project. For the... application for a demonstration project: (a) Program factors. (10 points) The Secretary reviews...

  13. Rationale, design, and methods for process evaluation in the Childhood Obesity Research Demonstration project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding peri...

  14. Tidd PFBC Demonstration Project. Quarterly report, January--March 1994

    SciTech Connect

    Not Available

    1994-04-01

    This is the 28th Technical Progress Report submitted to the Department of Energy in connection with the Cooperative Agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period of January 1, 1994 to March 31, 1994. Major activities during this period include: (1) The unit operated for 850 hours on coal, bringing the grand total for coal fire through the end of the quarter to 6318 hours. (2) The unit availability for the first quarter was 40.1%. (3) There were twelve gas turbine starts, eight bed preheater starts, and six operating periods on coal. (4) During this quarter, total gross generation was 40,721 MWH, the peak unit output for one hour was 62 MWH, and the coal consumption was 19,370 tons. (5) Three performance tests were conducted during this quarter; and (6) the plant was able to remain in service during the sub-zero weather in January, providing power to the critically short grid.

  15. Final report on Thermally Modified Sand demonstration project

    SciTech Connect

    Not Available

    1994-09-23

    The use of salt and salt/sand mixtures on icy roadway surfaces has dramatically increased during the past 30 years. Despite extensive documentation on salt related damage to the roadway improvements, vehicles and the environment, road maintenance departments have continued to rely on this practice. Road maintenance departments in northern climate areas have long recognized the safety benefits for public mobility on icy roadways from the use of sand. As an abrasive material, the sand improves the surface traction that results in more drivable and less hazardous road conditions during the winter months. Stockpiles of pure sand stored during the winter months oftentimes freeze into large unworkable, monolithic piles. To maintain a free-flowing condition, it has been found to be necessary to add salt to the sand. The addition of salt in amounts ranging from 5 to 10 percent to that of sand, is usually sufficient to provide relatively free-flowing abrasive material that could be stored in stockpiles and applied to icy road surfaces with conventional sand spreading trucks. Another alternative for winter storage of pure sand to maintain a free-flowing condition is in humidity-controlled, heated buildings. As would be expected, this method has high capital and operating costs. and not cost effective for general highway maintenance use. The invention demonstrated herein is a method of thermally modifying pure sand that will remain in a free-flowing state throughout the winter season without the need for the salt additive. The thermally modified sand provides an abrasive material that when applied to icy roads does not cause environmental and corrosive damage as done by the application of sand with salt. By employing a very simple process of freezing screened sand particles by forced air convection under subfreezing conditions, the invention creates a product that has significant value in terms of economic and environmental benefits.

  16. USDA area-wide project for annual grasses: outcomes and impacts

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This document provides a record of the research, outreach, education and technology transfer that was completed as part of the area-wide project for invasive annual grasses from 2007-2012. The overall goal of the project was to catalyze a holistic integrated management program for invasive annual g...

  17. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits... (OEP) computes and publishes the project cost and annual limits for natural gas pipelines blanket..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy...

  18. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits AGENCY... publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for... CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  19. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  20. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program... conduct experimental, pilot, and demonstration projects to promote the objectives or improve...

  1. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program... conduct experimental, pilot, and demonstration projects to promote the objectives or improve...

  2. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program... conduct experimental, pilot, and demonstration projects to promote the objectives or improve...

  3. Solar hot water demonstration project at Red Star Industrial Laundry, Fresno, California

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The performance of a Solar Hot Water System at a laundry in Fresno, California is described. The system features an integrated wastewater heat recovery subsystem and a solar preheating system designed to supply a part of the hot water requirements. Performance data for a six month period are projected to an annual savings of $18,703.

  4. Blast furnace granular coal injection project. Annual report, January--December 1995

    SciTech Connect

    1995-05-01

    This annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to employ British Steel technology that uses granular coal to provide part of the fuel requirement of blast furnaces. The project will demonstrate/assess a broad range of technical/economic issues associated with the use of coal for this purpose. To achieve the program objectives, the demonstration project is divided into the following three Phases: (1) Phase I - Design. (2) Phase II - Construction. (3) Phase III - Operation. Preliminary Design (Phase I) began in 1991 with detailed design commencing in 1993. Construction at Burns Harbor (Phase II) began in August 1993 and was completed at the end of 1994. The demonstration test program (Phase III) started in the fourth quarter of 1995.

  5. Improved recovery demonstration for Williston basin carbonates. Annual report, June 10, 1994--June 9, 1995

    SciTech Connect

    Sippel, M.; Zinke, S.; Magruder, G.; Eby, D.

    1995-09-01

    The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in-place, methods for improved completion efficiency and the suitability of waterflooding in Red River and Ratcliffe shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing three-dimensional and multi-component seismic are being investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterization tools are integrated with geological and engineering studies. Improved completion efficiency is being tested with extended-reach jetting lance and other ultra-short-radius lateral technologies. Improved completion efficiency, additional wells at closer spacing and better estimates of oil in place will result in additional oil recovery by primary and enhanced recovery processes.

  6. Improved recovery demonstration for Williston Basin carbonates. Annual report, June 10, 1995--June 9, 1996

    SciTech Connect

    Carrell, L.A.; Sippel, M.A.

    1996-09-01

    The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in-place, methods for improved completion efficiency and the suitability of waterflooding in Red River and Ratcliffe shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing three-dimensional and multi-component seismic are being investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterization tools are integrated with geological and engineering studies. Improved completion efficiency is being tested with extended-reach jetting lance and other ultra-short-radius lateral technologies. Improved completion efficiency, additional wells at closer spacing and better estimates of oil in place will result in additional oil recovery by primary and enhanced recovery processes.

  7. Annual energy outlook 1994: With projections to 2010

    SciTech Connect

    Not Available

    1994-01-01

    The Annual Energy Outlook 1994 (AEO94) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projects and analyses of energy supply, demand, and prices through 2010, based for the first time on results from the National Energy Modeling System (NEMS). NEMS is the latest in a series of computer-based energy modeling systems used over the past 2 decades by EIA and its predecessor organization, the Federal Energy Administration, to analyze and forecast energy consumption and supply in the midterm period (about 20 years). Quarterly forecasts of energy supply and demand for 1994 and 1995 are published in the Short-Term Energy Outlook (February 1994). Forecast tables for 2000, 2005, and 2010 for each of the five scenarios examined in the AEO94 are provided in Appendices A through E. The five scenarios include a reference case and four additional cases that assume higher and lower economic growth and higher and lower world oil prices. Appendix F provides detailed comparisons of the AEO94 forecasts with those of other organizations. Appendix G briefly described the NEMS and the major AEO94 forecast assumptions. Appendix H summarizes the key results for the five scenarios.

  8. Annual energy outlook 1997 with projections to 2015

    SciTech Connect

    1996-12-01

    The Annual Energy Outlook 1997 (AEO97) presents midterm forecasts of energy supply, demand, and prices through 2015 prepared by the Energy Information Administration (EIA). These projections are based on results of EIA`s National Energy Modeling System (NEMS). This report begins with a summary of the reference case, followed by a discussion of the legislative assumptions and evolving legislative and regulatory issues. ``Issues in Focus`` discusses emerging energy issues and other topics of particular interest. It is followed by the analysis of energy market trends. The analysis in AEO97 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present summaries of the reference case forecasts in units of oil equivalence and household energy expenditures. Twenty-three other cases explore the impacts of varying key assumptions in NEMS--generally, technology penetration, with the major results shown in Appendix F. Appendix G briefly describes NEMS and the major AEO97 assumptions, with a summary table. 114 figs., 22 tabs.

  9. Annual energy outlook 1995, with projections to 2010

    SciTech Connect

    1995-01-01

    The Annual Energy Outlook 1995 (AEO95) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projections and analyses of energy supply, demand, and prices through 2010, based on results from the National Energy Modeling System (NEMS). Quarterly forecasts of energy supply and demand for 1995 and 1996 are published in the Short-Term Energy Outlook (February 1995). Forecast tables for the five cases examined in the AEO95 are provided in Appendixes A through C. Appendix A gives historical data and forecasts for selected years from 1992 through 2010 for the reference case. Appendix B presents two additional cases, which assume higher and lower economic growth than the reference case. Appendix C presents two cases that assume higher and lower world oil prices. Appendix D presents a summary of the forecasts in units of oil equivalence. Appendix E presents a summary of household energy expenditures. Appendix F provides detailed comparisons of the AEO95 forecasts with those of other organizations. Appendix G briefly describes NEMS and the major AEO95 forecast assumptions. Appendix H presents a stand-alone high electricity demand case. Appendix 1 provides a table of energy conversion factors and a table of metric conversion factors. 89 figs., 23 tabs.

  10. Basalt Waste Isolation Project. Annual report, fiscal year 1980

    SciTech Connect

    Not Available

    1980-11-01

    During this fiscal year the information available in the fields of geology and hydrology of the Columbia Plateau was consolidated and two reports were issued summarizing this information. In addition, the information on engineered barriers was consolidated and a report summarizing the research to date on waste package development and design of borehole seals was prepared. The waste package studies, when combined with the hydrologic integration, revealed that even under extreme disruptive conditions, a repository in basalt with appropriately designed waste packages can serve as an excellent barrier for containment of radionuclides for the long periods of time required for waste isolation. On July 1, 1980, the first two heater tests at the Near-Surface Test Facility were started and have been successfully operated to this date. The papers on the Near-Surface Test Facility section of this report present the results of the equipment installed and the preliminary results of the testing. In October 1979, the US Department of Energy selected the joint venture of Kaiser Engineers/Parsons Brinckerhoff Quade and Douglas, Inc., to be the architect-engineer to produce a conceptual design of a repository in basalt. During the year, this design has progressed and concept selection has now been completed. This annual report presents a summary of the highlights of the work completed during fiscal year 1980. It is intended to supplement and summarize the nearly 200 papers and reports that have been distributed to date as a part of the Basalt Waste Isolation Project studies.

  11. Annual energy outlook 2005 with projections to 2025

    SciTech Connect

    2005-02-01

    The Annual Energy Outlook 2005 (AEO2005) presents midterm forecasts of energy supply, demand, and prices through 2025 prepared by the Energy Information Administration (EIA). The projections are based on results from EIA's National Energy Modelling System (NEMS). The report begins with an 'Overview' summarizing the AEO2005 reference case. The next section, 'Legislation and Regulations', discusses evolving legislative and regulatory issues in the USA. Issues in Focus includes discussions on key energy market issues and examines their potential impacts. In particular, it includes a discussion of the world oil price assumptions used in the reference case and four alternative world oil price cases examined in AEO2005. 'Issues in Focus' is followed by 'Market Trends', which provides a summary of energy market trends in the AEO2005 forecast. The analysis in AEO2005 focuses primarily on a reference case, lower and higher economic growth cases, and four alternative oil price cases, a low world oil price case, an October oil futures case, and two high world oil price cases. Forecast tables for those cases are provided in Appendixes A through D. The major results for the alterative cases, which explore the impacts of varying key assumption in NEMS (such as rates of technology penetration), are summarized in Appendix E. Appendix F briefly describes NEMS and the alternative cases. 115 figs., 38 tabs., 8 apps.

  12. Hangman Restoration Project, Annual Report 2002-2003.

    SciTech Connect

    Coeur d'Alene Tribe

    2003-10-01

    Progress has been made in defining the level of work that needs to be accomplished in the Hangman Watershed in order to restore a viable riparian system and hydrology. The end goal is to use wildlife habitat to protect streams and provide water for instream fish habitats. In order to define the most expedient means of attaining that goal an Instream Flow/Watershed Hydrology Study was initiated. The study is intended to be comprehensive in order to determine the potential of increasing base flow with Hangman Watershed Streams and predict available fish habitats for the range of flow level possibilities. The Study Plan and work for the first field season was contracted and the Plan and end of field season reports are included with this Annual Report. The initial draft of the wildlife portion of the Monitoring and Evaluation Plan was completed and presented to the Columbia Basin Fish and Wildlife Authority Wildlife Committee. The Committee felt that the Basin Hydrology Study needed to be closer to completion before the bulk of wildlife monitoring should be implemented. The extent of the landscape that must be restored in order to facilitate the needed stream flows may not be large enough to affect the population levels of the Plan's target species. The main result of the Committee review of the Monitoring and Evaluation Plan however, was that since the Hangman Restoration Project is not a HU driven wildlife mitigation project than the Wildlife Committee does not have a role to play since their focus is wildlife HU crediting projects. Further work on the wildlife portion of the Monitoring and Evaluation Plan is suspended until the crediting issues surrounding the Hangman Restoration Project are settled. Certain aspects of the Plan, such as the land bird, amphibian, reptile and beaver monitoring can be implemented in the spring of the coming year because monitoring these species and groups needs to be accomplished regardless of crediting status and baseline data is

  13. Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

    SciTech Connect

    Tuenge, Jason R.

    2011-06-28

    The U.S. Department of Energy is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr to a much larger figure nationally. Most of the energy savings in this application is attributable to the instant-restrike capability of LED products and to their high tolerance for frequent on/off switching, used here to separately control either end of the tunnel during daytime hours. Some LED luminaires rival or outperform their high-intensity discharge (HID) counterparts in terms of efficacy, but options are limited, and smaller lumen packages preclude true one-for-one equivalence. However, LED products continue to improve in efficacy and affordability at a rate unmatched by other light source technologies; the estimated simple payback period of eight years (excluding installation costs and maintenance savings) can be expected to improve with time. The proposed revisions to the existing high-pressure sodium (HPS) lighting system would require slightly increased controls complexity and significantly increased luminaire types and quantities. In exchange, substantial annual savings (from reduced maintenance and energy use) would be complemented by improved quantity and quality of illumination. Although advanced lighting controls could offer additional savings, it is unclear whether such a system would prove cost-effective; this topic may be explored in future work.

  14. Annual Energy Outlook 2011 with Projections to 2035

    SciTech Connect

    2011-04-01

    The projections in the Energy Information Administration's (EIA) Annual Energy Outlook 2011 (AEO2011) focus on the factors that shape the U.S. energy system over the long term. Under the assumption that current laws and regulations remain unchanged throughout the projections, the AEO2011 Reference case provides the basis for examination and discussion of energy production, consumption, technology, and market trends and the direction they may take in the future. It also serves as a starting point for analysis of potential changes in energy policies. But AEO2011 is not limited to the Reference case. It also includes 57 sensitivity cases (see Appendix E, Table E1), which explore important areas of uncertainty for markets, technologies, and policies in the U.S. energy economy. Key results highlighted in AEO2011 include strong growth in shale gas production, growing use of natural gas and renewables in electric power generation, declining reliance on imported liquid fuels, and projected slow growth in energy-related carbon dioxide (CO2) emissions even in the absence of new policies designed to mitigate greenhouse gas (GHG) emissions. AEO2011 also includes in-depth discussions on topics of special interest that may affect the energy outlook. They include: impacts of the continuing renewal and updating of Federal and State laws and regulations; discussion of world oil supply and price trends shaped by changes in demand from countries outside the Organization for Economic Cooperation and Development or in supply available from the Organization of the Petroleum Exporting Countries; an examination of the potential impacts of proposed revisions to Corporate Average Fuel Economy standards for light-duty vehicles and proposed new standards for heavy-duty vehicles; the impact of a series of updates to appliance standard alone or in combination with revised building codes; the potential impact on natural gas and crude oil production of an expanded offshore resource base

  15. 75 FR 55109 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Defense Science and Technology Reinvention Laboratory Personnel Management Demonstration Project..., September 9, 2010 / Notices#0;#0; ] DEPARTMENT OF DEFENSE Office of the Secretary Science and Technology... Defense to conduct personnel demonstration projects at DoD laboratories designated as Science...

  16. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  17. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  18. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... Requirements § 404.1629 Participation in research and demonstration projects. We will invite...

  19. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... Requirements § 404.1629 Participation in research and demonstration projects. We will invite...

  20. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... Requirements § 404.1629 Participation in research and demonstration projects. We will invite...

  1. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  2. The Social Security Administration's Youth Transition Demonstration Projects: Interim Report on Transition WORKS

    ERIC Educational Resources Information Center

    Fraker, Thomas; Black, Alison; Mamun, Arif; Manno, Michelle; Martinez, John; O'Day, Bonnie; O'Toole, Meghan; Rangarajan, Anu; Reed, Debbie

    2011-01-01

    The Social Security Administration is funding a random assignment evaluation of six demonstration projects to improve employment and other outcomes for youth ages 14 to 25 who are either receiving disability benefits or are at high risk of receiving them in the future. This report reviews the Youth Transition Demonstration (YTD) projects, located…

  3. 78 FR 34655 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-10

    ...On December 10, 2010 (75 FR 77380-77447), DoD published a notice of approval of a personnel management demonstration project for eligible ONR employees. Within that notice, there were several typographical errors discovered. Additionally, after the publication of the notice and implementation of the demonstration project, ONR determined that for effective personnel management practices,......

  4. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  5. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  6. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  7. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  8. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  9. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... Requirements § 404.1629 Participation in research and demonstration projects. We will invite...

  10. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  11. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... projects in the SSI program. 416.250 Section 416.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program... administration of the SSI program. These projects will test the advantages of altering certain...

  12. Worker Relocation: A Review of U.S. Department of Labor Mobility Demonstration Projects. Final Report.

    ERIC Educational Resources Information Center

    Fairchild, Charles K.

    This report reviews the knowledge gained in 4 years of operation of labor mobility demonstration projects and provides guidelines on the design and operation of a permanent worker relocation program. Data were gathered both from written material covering the experience of each project and from field trips to some of the projects when additional…

  13. Extended Burnup Demonstration Reactor Fuels Program. Annual progress report, April 1983-March 1984. [BWR

    SciTech Connect

    Exarhos, C.A.

    1985-06-20

    The US Department of Energy, Consumers Power Company, Exxon Nuclear Company, and General Public Utilities Nuclear Corporation have participated since 1979 in a cooperative Extended Burnup Demonstration Program. Under the program, standard ENC-fabricated reload fuel in the Big Rock Point and Oyster Creek reactor cores has been irradiated to discharge burnups at or beyond 35,000 MWD/MTU, one to two cycles beyond its originally projected exposure life. The program provides for examination of the fuel at poolside before and after each extended burnup cycle as well as for limited destructive hot cell examination. The 1984 progress report covers work performed under the EBD program between April 1983 and March 1984. Major milestones reached during the period include completion of a hot cell examination on four high burnup rods from Big Rock Point and of a poolside on the Oyster Creek EBD fuel at discharge. The hot cell examination of four rods at burnups to 37.2 GWD/MTU confirmed poolside measurements on the same fuel, showing the urania and gadolinia-bearing fuel rods to be in excellent condition. No major cladding degradation, pellet restructuring, or pellet-clad interaction was found in any of the samples examined. The Oyster Creek fuel, examined at an assembly average exposure of 34.5 GWD/MTU, showed good performance with regard to both diametral creepdown and clad oxide accumulation.

  14. Algebra Project DR K-12 Cohorts--Demonstration Project: Summative Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark

    2014-01-01

    The Algebra Project DR K-12, funded by the National Science Foundation as a Research and Development Project, addressed the challenge of offering significant STEM content for students to ensure public literacy and workforce readiness. The project's primary purpose was to test the feasibility and effectiveness of a model for establishing four-year…

  15. Ferrocyanide safety project ferrocyanide aging studies FY 1995 annual report

    SciTech Connect

    Lilga, M.A.; Alderson, E.V.; Hallen, R.T.

    1995-09-01

    This annual report gives the results of the work conducted by the Pacific Northwest Laboratory in FY 1995 on Task 3 of the Ferrocyanide Safety Project, Ferrocyanide Aging Studies. Aging refers to the dissolution and hydrolysis of simulated Hanford ferrocyanide waste in alkaline aqueous solutions by radiolytic and chemical means. The ferrocyanide simulant primarily used in these studies was dried In-Farm-1B, Rev. 7, prepared by Westinghouse Hanford Company to simulate the waste generated when the In-Farm flowsheet was used to remove radiocesium from waste supernates in single-shell tanks at the Hanford Site. In the In-Farm flowsheet, nickel ion and ferrocyanide anion were added to waste supernates to precipitate sodium nickel ferrocyanide, Na{sub 2}NiFe(CN){sub 6}, and co-precipitate radiocesium. Once the radiocesium was removed, supernates were pumped from the tanks, and new wastes from cladding removal processes or from evaporators were added. These new wastes were typically highly caustic, having hydroxide ion concentrations of over 1 M and as high as 4 M. The Aging Studies task is investigating reactions this caustic waste may have had with the precipitated ferrocyanide waste in a radiation field. In previous Aging Studies research, Na{sub 2}NiFe(CN){sub 6} in simulants was shown to dissolve in basic solutions, forming insoluble Ni(OH){sub 2} and soluble Na{sub 4}Fe(CN){sub 6}. The influence on solubility of base strength, sodium ion concentration, anions, and temperature was previously investigated. The results may indicate that even ferrocyanide sludge that did not come into direct contact with highly basic wastes may also have aged significantly.

  16. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  17. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    NASA Astrophysics Data System (ADS)

    1994-07-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  18. Bilingual Readiness in Earliest School Years; A Curriculum Demonstration Project. Bilingual Readiness in Primary Grades; An Early Childhood Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Finocchiaro, Mary; King, Paul F.

    These two curriculum demonstration projects on bilingual readiness in the earliest school years contain many similarities. Both were formed on the thesis that young children can and will learn a second language readily and that the urban classroom mixture of Spanish-speaking, English-speaking, and Negro-dialect speaking children can be capitalized…

  19. StreamNet Project : Annual Report Fiscal Year 2008.

    SciTech Connect

    Schmidt, Bruce; Roger, Phil; Oftedahl, Lenora

    2008-12-12

    development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project

  20. Healy Clean Coal Project 1993 annual progress report

    SciTech Connect

    Not Available

    1994-06-01

    The primary objective of the HCCP is to demonstrate a new power plant design integrating an advanced combustor and heat recovery system coupled with both high and low temperature emission control processes. The parties anticipate that, if the demonstration project is successful, the technology will be commercialized in the late 1990s and be capable of (1) achieving significant reductions in the emissions of sulfur dioxide and the oxides of nitrogen from existing facilities, (2) providing for future energy needs in an environmentally acceptable manner. Alaskan bituminous and subbituminous coals will be the fuels. Emissions of SO{sub 2}, and NO{sub x}, from the plant will be controlled using TRW`s slagging coal combustor with limestone injection, in conjunction with a boiler supplied by Foster Wheeler. Further SO{sub 2}, and particulate removal will be accomplished using Joy Technologies, Inc.`s (Joy) Activated Recycle Spray Absorber System. Successful demonstration of these technologies is expected to result in NO{sub x}, emissions of less than 0.2 lb/MMBtu and SO{sub 2}, removal efficiencies greater than 90 percent. The heart of the system being demonstrated is a combustion system. Each combustor consists of two cylindrical sections followed by a short duct that connects the combustor to the boiler. A precombustor burns about 35 percent of the coal to preheat the main combustor secondary air. The preheated air enters the main combustor section tangentially to impart a swirling motion to the coal and air. The balance of the coal is injected axially through multiple injection ports at the front end of this cylindrical section.

  1. 77 FR 22770 - Termination of Provider Reimbursement Demonstration Project for the State of Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... INFORMATION: On November 20, 2006 (71 FR 67113), DoD published a Notice of a TRICARE demonstration project for... years, ending on December 31, 2009. The demonstration was extended twice. On December 18, 2009 (74 FR... December 31, 2010, and on July 8, 2010 (75 FR 39213), DoD published a Notice of demonstration...

  2. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    EPA Science Inventory

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  3. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1997-1998.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This document contains project abstracts for 29 adult basic and literacy education (ABLE) demonstration programs that were conducted in Pennsylvania in 1997-1998 through grants funded under Section 353 of the Adult Education Act. Each abstract includes the following: project name, number, purpose, impact, outcomes, conclusions/recommendations,…

  4. Blast furnace granular coal injection project. Annual report, January--December 1994

    SciTech Connect

    1995-07-01

    This annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is receiving cost-sharing from the US Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to employ British Steel technology that uses granular coal to provide part of the fuel requirement of blast furnaces. The project will demonstrate/assess a broad range of technical/economic issues associated with the use of coal for this purpose. These include: coal grind size, coal injection rate, coal source (type) and blast furnace conversion method. To achieve the program objectives, the demonstration project is divided into the following three Phases: Phase I -- design; Phase II -- construction; and Phase III -- operation. Preliminary design (Phase I) began in 1991 with detailed design commencing in 1993. Construction at Burns Harbor (Phase II) began in August 1993 and was completed at the end of 1994. A 100% construction review meeting was held in December and attended by representatives of DOE, Fluor Daniel and Bethlehem Steel. The coal preparation mills were started up in December, 1994, and the first coal was injected into ``D`` blast furnace on December 19, 1994. Near the end of the year, the grinding mills and injection facility were being prepared for performance testing during the first quarter of 1995. The demonstration test program (phase III) will start in the fourth quarter of 1995.

  5. Learning through a portfolio of carbon capture and storage demonstration projects

    NASA Astrophysics Data System (ADS)

    Reiner, David M.

    2016-01-01

    Carbon dioxide capture and storage (CCS) technology is considered by many to be an essential route to meet climate mitigation targets in the power and industrial sectors. Deploying CCS technologies globally will first require a portfolio of large-scale demonstration projects. These first projects should assist learning by diversity, learning by replication, de-risking the technologies and developing viable business models. From 2005 to 2009, optimism about the pace of CCS rollout led to mutually independent efforts in the European Union, North America and Australia to assemble portfolios of projects. Since 2009, only a few of these many project proposals remain viable, but the initial rationales for demonstration have not been revisited in the face of changing circumstances. Here I argue that learning is now both more difficult and more important given the slow pace of deployment. Developing a more coordinated global portfolio will facilitate learning across projects and may determine whether CCS ever emerges from the demonstration phase.

  6. FCV Learning Demonstration: Project Midpoint Status and First-Generation Vehicle Results; Preprint

    SciTech Connect

    Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

    2007-12-01

    This paper covers the progress accomplished by the U.S. DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project since inception, including results from analysis of six months of new data.

  7. UCA{trademark} demonstration project at United Power Association. Final report

    SciTech Connect

    1997-12-01

    Integrated communications, field device interfaces, and control center operations are key aspects of successful distribution automation projects. This project demonstrated substation, feeder, and customer automation functions supported by twelve vendors using EPRI`s Utility Communications Architecture (UCA{trademark}) in an end-to-end implementation of the UCA 2.0 standard. A key project highlight was the ability of the vendor team to achieve the common goal of UCA implementation in a distribution automation setting.

  8. 2 kWe Solar Dynamic Ground Test Demonstration Project. Volume 3; Fabrication and Test Report

    NASA Technical Reports Server (NTRS)

    Alexander, Dennis

    1997-01-01

    The Solar Dynamic Ground Test Demonstration (SDGTD) project has successfully designed and fabricated a complete solar-powered closed Brayton electrical power generation system and tested it in a relevant thermal vacuum facility at NASA Lewis Research Center (LeRC). In addition to completing technical objectives, the project was completed 3-l/2 months early, and under budget.

  9. [Science and Self-Determination Upward Bound National Demonstration Project. Report and Evaluation, First Cycle].

    ERIC Educational Resources Information Center

    Williams, Richard; And Others

    Upward Bound's National Demonstration Project "Science and Self-Determination" (SSD) awarded to the American Indian Educational Opportunity Program at University of Colorado, Boulder, in 1980 shares a common purpose with other Upward Bound Projects: to provide opportunity to low income and otherwise disadvantaged secondary students to attend…

  10. 77 FR 66182 - TRICARE Over-the-Counter Drug Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... a notice in the Federal Register (72 FR 33208-33210) implementing the demonstration project until... beneficiary satisfaction with the project, the Department published a notice in the Federal Register (74 FR... beneficiary satisfaction of providing OTC drugs under the pharmacy benefits program when the selected...

  11. American Indian Community Library Demonstration Project. First--Fourth Quarterly Reports, 1976-77.

    ERIC Educational Resources Information Center

    Smith, Lotsee

    Quarterly progress reports present the major accomplishments and activities of four American Indian Community Library Demonstration projects funded during 1976-1977. These projects established library services in New Mexico for four previously unserved Pueblo communities: Cochiti, Santo Domingo, Sky City, and Laguna. For each quarter, an overall…

  12. Evaluating a "Second Life" Problem-Based Learning (PBL) Demonstrator Project: What Can We Learn?

    ERIC Educational Resources Information Center

    Beaumont, Chris; Savin-Baden, Maggi; Conradi, Emily; Poulton, Terry

    2014-01-01

    This article reports the findings of a demonstrator project to evaluate how effectively Immersive Virtual Worlds (IVWs) could support problem-based learning. The project designed, created and evaluated eight scenarios within "Second Life" (SL) for undergraduate courses in health care management and paramedic training. Evaluation was…

  13. The NEPAD e-Schools Demonstration Project: A Work in Progress. A Public Report

    ERIC Educational Resources Information Center

    Farrell, Glen; Isaacs, Shafika; Trucano, Michael

    2007-01-01

    The NEPAD e-Schools Initiative is a multi-country, multi-stakeholder, continental project to teach ICT skills to young Africans in primary and secondary schools and improve the provision of education in schools through the use of ICT applications and the Internet. The first phase of the Initiative is a "Demonstration Project" ("Demo") being…

  14. URBAN SOIL LEAD ABATEMENT DEMONSTRATION PROJECT: VOLUME I, U.S. EPA INTEGRATED REPORT

    EPA Science Inventory

    The Urban Soil Lead Abatement Demonstration Project (USLADP), known also as the A Three City Lead Study,was authorized in 1986 under Section 111(b)(6) of the Superfund Amendments and Reauthorization Act (SARA), which mandated that EPA conduct soil lead abatement projects in up to...

  15. Research development and demonstration of a fuel cell/battery powered bus system. Annual report, January 1--December 31, 1994

    SciTech Connect

    Wimmer, R.

    1995-01-01

    This report describes the progress in the Georgetown University research, development and demonstration project of a fuel cell/battery powered bus system. The topics addressed in the report include demonstrations, vehicle design and application analysis, technology transfer activities, coordination and monitoring of system design and integration contractor, fuel cell bus test program, current problems, work planned, and manpower, cost and schedule reports.

  16. Box Canyon Model Watershed Project : Annual Report 1997/1998.

    SciTech Connect

    Kalispel Natural Resource Department

    1998-01-01

    In 1997, the Kalispel Natural Resource Department (KNRD) initiated the Box Canyon Watershed Project. This project will concentrate on watershed protection and enhancement from an upland perspective and will complement current instream restoration efforts implemented through the Kalispel Resident Fish Project. Primary focus of this project is the Cee Cee Ah Creek watershed due to its proximity to the Reservation, importance as a traditional fishery, and potential for bull trout and west-slope cutthroat trout recovery.

  17. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  18. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  19. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  20. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  1. Final Report of the Adult Competency Education Project. An Experimental Adult Basic Education Demonstration Project.

    ERIC Educational Resources Information Center

    San Mateo County Office of Education, Redwood City, CA. Career Preparation Centers.

    The Adult Competency Education (ACE) Project sought to define basic job-related skills and tasks for the development of instructional programs. The programs included a vocational counseling component to assist students in establishing skills needed to increase employability. In phase 1 the 100 entry-level jobs most frequently occurring in San…

  2. Project Assist: A Counseling, Communication and Instruction Program Manual. Title VII Demonstration Project 1981-1984.

    ERIC Educational Resources Information Center

    Ocean View School District, Oxnard, CA.

    The goals of Project Assist in the Ocean View School District (California) are to socialize sixth through eighth grade recent immigrant and other limited English proficient students into the school mainstream and to aid them in passing eigth grade competency tests in basic skills of English reading, written composition, and mathematics. The…

  3. Project A+ Elementary Technology Demonstration Schools 1990-91. The First Year.

    ERIC Educational Resources Information Center

    Marable, Paula; Frazer, Linda

    Project A+ Elementary Technology Demonstration Schools is a program made possible through grants from IBM (International Business Machines Corporation) and Apple, Inc. The primary purpose of the program is to demonstrate the educational effectiveness of technology in accelerating the learning of low achieving at-risk students and enhancing the…

  4. 76 FR 12507 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ... 2011. On September 9, 2010, DoD published the proposed STRL Demonstration Project for TARDEC in 75 FR... March 7, 2011 Part III Department of Defense Science and Technology Reinvention Laboratory Personnel... Secretary Science and Technology Reinvention Laboratory Personnel Management Demonstration...

  5. The Use of Surveys in a Responsive Evaluation: Evaluation of a National Sex Equity Demonstration Project.

    ERIC Educational Resources Information Center

    Stake, Bernadine Evans; And Others

    During the last 2 years (1980-82), selected schools in the Broward County School District in Florida participated in the National Sex Equity Demonstration Project (NSEDP) to create a model for demonstration of curricular materials, educational practices, and program arrangements that feature gender-fair instruction and associated educational…

  6. Heber Geothermal Binary Demonstration Project. Quarterly technical progress report, September 15, 1980-March 31, 1981

    SciTech Connect

    Hanenburg, W.H.; Lacy, R.G.; Van De Mark, G.D.

    1981-06-01

    Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of September 15, 1980, through March 31, 1981 is documented. Topics covered in this quarterly report include progress made in the areas of Wells and Fluids Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  7. A Demonstration Project: Group Care of Infants and Toddlers. Final Report.

    ERIC Educational Resources Information Center

    North Carolina Univ., Greensboro.

    This research and demonstration project involved the establishment of a demonstration Nursery Center to provide for the daytime care of infants and toddlers in groups and for the evaluation of this experience. A descriptive account is given of the founding of the center and of its operation over a three-year period. Finding housing and suitable…

  8. The implementation of the Human Exploration Demonstration Project (HEDP), a systems technology testbed

    NASA Technical Reports Server (NTRS)

    Rosen, Robert; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the NASA's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment consists of life support systems, physiological monitoring of project crew, a virtual environment work station, and centralized data acquisition and habitat systems health monitoring. The HEDP is an integrated technology demonstrator, as well as an initial operational testbed. There are several robotic systems operational in a simulated planetary landscape external to the habitat environment, to provide representative work loads for the crew. This paper describes the evolution of the HEDP from initial concept to operational project; the status of the HEDP after two years; the final facilities composing the HEDP; the project's role as a NASA Ames Research Center systems technology testbed; and the interim demonstration scenarios that have been run to feature the developing technologies in 1993.

  9. Demonstrating artificial intelligence for space systems - Integration and project management issues

    NASA Technical Reports Server (NTRS)

    Hack, Edmund C.; Difilippo, Denise M.

    1990-01-01

    As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

  10. Project Directors' Annual Meeting (4th, Washington, D.C., December 1-2, 1988).

    ERIC Educational Resources Information Center

    Chadsey-Rusch, Janis

    The document contains materials relating to the annual meeting of the project directors working with the Secondary Transition Intervention Effectiveness Institute, held December 1-2, 1988. The document includes an agenda, summaries of 10 featured project presentations, summaries of 32 poster sessions, a list of meeting participants, and a…

  11. NREL Solar Radiation Resource Assessment Project: Status and outlook. Annual progress report, FY 1992

    SciTech Connect

    Renne, D.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.; Riordan, C.; Hammond, E.; Ismailidis, T.

    1993-06-01

    This annual report summaries the activities and accomplishments of the Solar Radiation Resource Assessment Project during fiscal year 1992 (1 October to 30 September 1992). Managed by the Analytic Studies Division of the National Renewable Energy Laboratory, this project is the major activity of the US Department of Energy`s Resource Assessment Program.

  12. Interagency Child Abuse Network Project. Annual Report: Innovations in Protective Services.

    ERIC Educational Resources Information Center

    Dennis-Small, Lucretia

    This annual report describes the Interagency Child Abuse Network (ICAN) Project, a joint venture of the Texas Department of Human Services and the Alamo Area Council of Governments in Bexar County. The goal of the ICAN Project was to establish a network of agencies in the county that could develop a team approach to handling child abuse cases. The…

  13. Solar heating and cooling demonstration project at the Florida solar energy center

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. The system was designed to supply approximately 70 percent of the annual cooling and 100 percent of the heating load. The project provides unique high temperature, nonimaging, nontracking, evacuated tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection. Information is provided on the system's acceptance test results operation, controls, hardware and installation, including detailed drawings.

  14. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D.; Severinghaus, W.D.; Brent, J.J.

    1989-04-01

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers` Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA`s barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely.

  15. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D. . Energy Systems Div.); Severinghaus, W.D. ); Brent, J.J. )

    1989-04-01

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers' Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA's barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely.

  16. The Nucla Circulating Fluidized-Bed Demonstration Project: A U.S. DOE post-project assessment

    SciTech Connect

    1995-06-01

    This report is a post-project assessment of the Nucla Circulating Fluidized-Bed (CFB) Demonstration Project, the second project to be completed in the DOE Clean Coal Technology Program. Nucla was the first successful utility repowering project in the US, increasing the capacity of the original power station from 36 MW(e) to 110 MW(e) and extending its life by 30 years. In the CFB boiler, combustion and desulfurization both take place in the fluidized bed. Calcium in the sorbent captures sulfur dioxide and the relatively low combustion temperatures limit NOx formation. Hot cyclones separate the larger particles from the gas and recirculates them to the lower zones of the combustion chambers. This continuous circulation of coal char and sorbent particles is the novel feature of CFB technology. This demonstration project significantly advanced the environmental, operational, and economic potential of atmospheric CFB technology, precipitating a large number of orders for atmospheric CFB equipment. By 1994, more than 200 atmospheric CFB boilers have been constructed worldwide. Although at least six CFB units have been operated, the Nucla project`s CFB database continues to be an important and unique resource for the design of yet larger atmospheric CFB systems. The post-project assessment report is an independent DOE appraisal of the success a completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology as well as an analysis of the commercial market.

  17. LARGE-SCALE DEMONSTRATION AND DEPLOYMENT PROJECT-TECHNOLOGY INFORMATION SYSTEM (LSDDP-TIS)

    SciTech Connect

    M.A. Ebadian, Ph.D.

    1999-01-01

    In recent years, an increasing demand for remediation technologies has fueled rapid growth in the D&D technologies. The D&D project managers are now faced with the task of selecting from among the many commercially available and innovative technologies, the most appropriate technology, or combination of technologies, that will address their specific D&D needs. The DOE's Office of Science and Technology (OST) sponsored the Large-Scale Demonstration and Deployment Projects (LSDDP) to demonstrate improved and innovative technologies that are potentially beneficial to DOE's environmental project. To date, three LSDDPS have been conducted at DOE's nuclear production and research facilities at the Fernald Environmental Management Project--Plant-1 (FEMP), Chicago Pile-5 Research Reactor (CP-5), and Hanford Production Reactor 105-C, Now four new LSDDPS have been launched at the Los Alamos National Laboratory (LANL), Idaho National Engineering and Environmental Laboratory (INEEL), Savannah River Site (SRS), and Mound Environmental Management Project (MEMP). In the LSDDPS, an extensive search is first conducted to identify candidate technologies that can potentially address the identified problems The candidate technologies then go through a screening process to select those technologies with the best potential for addressing remediation problems at the LSDDP site as well as project sites across the DOE complex. This selection process can be overwhelming and time-consuming. The result is that D&D project managers for the new LSDDPS are challenged to avoid duplication of demonstrated technologies.

  18. Demonstration program for coal-oil mixture combustion in an electric utility boiler - Category III A. 1978 annual report

    SciTech Connect

    Not Available

    1980-04-01

    The 1978 annual report covers New England Power Service Company's participation in the Department of Energy coal-oil mixture (COM) program. Continued world-wide unrest resulting in an unstable fuel oil supply coupled with rapidly inflating costs have caused continued interest in a demonstrable viable solution. NEPSCO's program, while not attaining all the milestones forecast, has made considerable progress. As of January 31, 1979, ninety-five (95% percent of engineering and design has been completed. Construction of facilities and installation of required equipment was approximately 75% complete and the six-week Feasibility Testing program was expected to commence during April 1979.

  19. Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project

    SciTech Connect

    Sheppy, M.; Metzger, I.; Cutler, D.; Holland, G.; Hanada, A.

    2014-01-01

    As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

  20. Employment Projections and Program Priorities. AIR 1999 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Rosenthal, Dan; Collier, Kitty

    This study compared occupational projections for Alabama with graduation rates in corresponding academic programs to provide a context for state and institutional policy decisions on new program initiatives and to comply with recent program viability legislation. The study examined number of degrees conferred, employment projections, and…

  1. NREL Energy Storage Projects: FY2013 Annual Report

    SciTech Connect

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  2. Project CREATES. First Annual Report 1968-69.

    ERIC Educational Resources Information Center

    Stolurow, Lawrence M.; Klare, George R.

    Project CREATES stands for Combined Resources for Editing Automated Teaching to Enlighten Students, the Harvard University Computer-Aided Instruction Laboratory's part of "A Multi-Agency Developmental Adult Basic Education Program." The major emphases of Project CREATES have been in the area of program and procedure development for computer-aided…

  3. SPEEDIER Project. Third Annual Report, 1969-70.

    ERIC Educational Resources Information Center

    Curriculum Study Research and Development Council of South Central Pennsylvania, Palmyra.

    This project was funded under ESEA Title III and four subcontracts with Research for Better Schools. The Title III aspect of the project focused on curriculum change in the fields of language arts, social sciences, and teacher training. Complete reports on each of the following have been included: 1) the Social Studies Pilot Programs as described…

  4. Kalispel Resident Fish Project, 2005-2006 Annual Report.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2006-07-01

    In 2005 the Kalispel Natural Resource Department (KNRD) monitored its current enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth Bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in East River and several of its tributaries.

  5. Kalispel Resident Fish Project, 2004-2005 Annual Report.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2005-06-01

    In 2004 the Kalispel Natural Resource Department (KNRD) implemented a new enhancement monitoring project for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in tributaries to the Pend Oreille River.

  6. Secretary's annual report to Congress. Volume III. Project summaries

    SciTech Connect

    1981-01-01

    Progress and status of representative projects in each program within DOE are summarized. Subjects covered and the number of projects reported on are: conservation (2); fossil energy (11); nuclear energy (5); renewable energy resources (16); energy production and power marketing (3); general science (11); defense programs (7); contingency planning (3); and management and oversight (1). (MCW)

  7. Pacific Northwest GridWise™ Testbed Demonstration Projects; Part I. Olympic Peninsula Project

    SciTech Connect

    Hammerstrom, Donald J.; Ambrosio, Ron; Carlon, Teresa A.; DeSteese, John G.; Horst, Gale R.; Kajfasz, Robert; Kiesling, Laura L.; Michie, Preston; Pratt, Robert G.; Yao, Mark; Brous, Jerry; Chassin, David P.; Guttromson, Ross T.; Jarvegren, Olof M.; Katipamula, Srinivas; Le, N. T.; Oliver, Terry V.; Thompson, Sandra E.

    2008-01-09

    This report describes the implementation and results of a field demonstration wherein residential electric water heaters and thermostats, commercial building space conditioning, municipal water pump loads, and several distributed generators were coordinated to manage constrained feeder electrical distribution through the two-way communication of load status and electric price signals. The field demonstration took place in Washington and Oregon and was paid for by the U.S. Department of Energy and several northwest utilities. Price is found to be an effective control signal for managing transmission or distribution congestion. Real-time signals at 5-minute intervals are shown to shift controlled load in time. The behaviors of customers and their responses under fixed, time-of-use, and real-time price contracts are compared. Peak loads are effectively reduced on the experimental feeder. A novel application of portfolio theory is applied to the selection of an optimal mix of customer contract types.

  8. Commercial scale demonstration enhanced oil recovery by micellar-polymer flood. Annual report, October 1979-September 1980

    SciTech Connect

    Howell, J.C.; Snyder, W.O.

    1981-04-01

    This commercial scale test, known as the M-1 Project, is located in Crawford County, Illinois. It encompasses 407 acres of Robinson sand reservoir and covers portions of several waterflood projects that were approaching economic limit. The project includes 248 acres developed on a 2.4-acre five-spot pattern and 159 acres developed on a 5.0-acre five-spot pattern. Development work commenced in late 1974 and has previously been reported. Micellar solution (slug) injection was initiated on February 10, 1977, and is now completed. After 10% of a pore volume of micellar slug was injected, injection of 11% pore volume of Dow 700 Pusher polymer was conducted at a concentration of 1156 ppM. At the end of this reporting period, 625 ppM polymer was being injected into the 2.5-acre pattern and 800 ppM polymer was being injected into the 5.0-acre pattern. The oil cut of the 2.5 and 5.0-acre patterns increased from 8.6% and 5.2%, respectively in September 1979, to 11.0% and 5.9% in September 1980. The oil cut performance has consistently exceeded that predicted for the project. This Fourth Annual Report is organized under the following three Work Breakdown Structures: fluid injection; production; and performance monitoring.

  9. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    SciTech Connect

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  10. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    SciTech Connect

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  11. Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

    SciTech Connect

    Tuenge, Jason R.

    2011-06-01

    The U.S. Department of Energy (DOE) is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service (NPS) views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other NPS tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr for this tunnel to a much larger figure national

  12. Wisconsin electric and hybrid vehicle demonstration project. Final report, 1981-1985

    SciTech Connect

    Not Available

    1986-02-10

    In 1981, the Wisconsin Board of Vocational, Technical and Adult Education (WBVTAE) was selected by the US Department of Energy for participation in the National Electric and Hybrid Vehicle Demonstration Program. On September 30, 1985, the data collection phase of the project was completed. The project was to purchase ten (10) electric vehicles and assign five (5) to Northeast Wisconsin Technical Institute (NWTI) in Green Bay and five (5) vehicles to the Madison Area Technical College.

  13. Fifteenmile Creek Riparian Buffers Project, Annual Report 2002-2003.

    SciTech Connect

    Graves, Ron

    2004-02-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteenmile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. During this second year of the project, 11 buffer contracts were implemented on 10.9 miles of stream. Buffer widths averaged 132 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.6 years. The total value of contracts established this year is $666,121 compared with $71,115 in Bonneville Power Administration (BPA) contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. In addition, specific outreach efforts targeting the orchard areas of the county began to bear fruit with orchardists sign-ups as the project year ended. Progress this second year of project includes only work accomplished in the Fifteenmile subbasin. A similar but separate effort to implement buffers in the Columbia Plateau Province was initiated during the year under project number 2002-019-00. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion.

  14. Wasco Riparian Buffer Project, Annual Report 2003-2004.

    SciTech Connect

    Graves, Ron

    2003-07-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Deschutes River Sub-basin Summary, March 2, 2001. This project is providing the technical planning support needed to implement at least 20 riparian buffer system contracts on approximately 800 acres covering an estimated 36 miles of anadromous fish streams. During this second year of implementation, 17 buffer contracts were established on 173,462 ft. of stream (25.9 miles). Acreage included in the buffers totaled 891.6 acres. Average buffer width was 112 ft. on each side of the stream. Cumulative totals through the first two project years are 26 buffers on 36.6 stream miles covering 1,283.6 acres. Actual implementation costs, lease payments, and maintenance costs will be borne by existing USDA programs: Conservation Reserve (CRP) and Conservation Reserve Enhancement Programs (CREP). The lease period of each contract may vary from 10 to 15 years. During this year, the average lease period was 14.9 years. The total value of contracts established this year is $1,421,268 compared with $55,504 in BPA contract costs to provide the technical support needed to get the contracts implemented. Cumulative contract value for the first two years is $1,919,451 compared to $103,329 cost to BPA. This project provides technical staffing to conduct assessments and develop conservation plans required for riparian buffer systems to help keep pace with a growing backlog of potential buffer projects. This project meets a critical need in the lower Deschutes and lower John Day River basins and complements the Riparian Buffer project approved for Fifteenmile watershed, Project No. 2001-021-00 begun in fiscal year 2001. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion and benefits the mid-Columbia ESU of steelhead.

  15. Advanced Gas Turbine (AGT) Technology Development Project annual report

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This report is the tenth in a series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Carborundum Company, and AiResearch Casting Company. The Project is administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report covers plans and progress for the period July 1, 1984 through June 30, 1985.

  16. Stakeholder views on financing carbon capture and storage demonstration projects in China.

    PubMed

    Reiner, David; Liang, Xi

    2012-01-17

    Chinese stakeholders (131) from 68 key institutions in 27 provinces were consulted in spring 2009 in an online survey of their perceptions of the barriers and opportunities in financing large-scale carbon dioxide capture and storage (CCS) demonstration projects in China. The online survey was supplemented by 31 follow-up face-to-face interviews. The National Development and Reform Commission (NDRC) was widely perceived as the most important institution in authorizing the first commercial-scale CCS demonstration project and authorization was viewed as more similar to that for a power project than a chemicals project. There were disagreements, however, on the appropriate size for a demonstration plant, the type of capture, and the type of storage. Most stakeholders believed that the international image of the Chinese Government could benefit from demonstrating commercial CCS and that such a project could also create advantages for Chinese companies investing in CCS technologies. In more detailed interviews with 16 financial officials, we found striking disagreements over the perceived risks of demonstrating CCS. The rate of return seen as appropriate for financing demonstration projects was split between stakeholders from development banks (who supported a rate of 5-8%) and those from commercial banks (12-20%). The divergence on rate alone could result in as much as a 40% difference in the cost of CO(2) abatement and 56% higher levelized cost of electricity based on a hypothetical case study of a typical 600-MW new build ultrasupercritical pulverized coal-fired (USCPC) power plant. To finance the extra operational costs, there were sharp divisions over which institutions should bear the brunt of financing although, overall, more than half of the support was expected to come from foreign and Chinese governments. PMID:22191735

  17. Magma energy research project, FY80 annual progress report

    NASA Astrophysics Data System (ADS)

    Colp, J. L.

    1982-04-01

    The technical feasibility of extracting energy from magma bodies is explored. Five aspects of the project are studied: resource location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction.

  18. UAS Integration in the NAS Project - FY 14 Annual Review

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Randall, Debra; Hackenberg, Davis

    2014-01-01

    This briefing gives insight into the research activities and efforts being executed in order to integrate unmanned aircraft systems into the national airspace system. This briefing is to inform others of the UAS-NAS Projects progress and future directions.

  19. Nez Perce Tribal Hatchery Project, 1999 Annual Report.

    SciTech Connect

    Johnson, David B.; Larson, Roy Edward; Walker, Grant W.

    2001-08-17

    This report consists of activities/events conducted in response to the Objectives and Tasks described in the 1999 contract Statement Of Work for the Planning and Planning and Design (P and D) and Maintenance (O and M) activities of the Nez Perce Tribal Hatchery (NPTH). The report follows the format of the contract for ease in finding accomplishments. Although specific emphasis will be placed on activities related directly to the NPTH, activities from other artificial production related projects might also be noted because of overlap in staff duties and production facilities. Additionally, the project leader's role has evolved as other Tribal fisheries projects have been developed and assigned to the Production Division, Department of Fisheries Resource Management (DFRM), and Nez Perce Tribe (NPT). Thus, implementation of the project leader role for the NPTH actually entails specific duties of the Production Division Director and the Production Division Coordinator, as well as the Hatchery Division Coordinator.

  20. Grande Ronde Basin Fish Habitat Enhancement Project : 1998 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Powell, Russ M.

    1999-05-01

    The primary goal of ''The Grande Ronde Basin Fish Habitat Improvement Project'' is to access, create, improve, protect, and restore reparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin.

  1. Magma Energy Research Project, FY80 annual progress report

    SciTech Connect

    Colp, J.L.

    1982-04-01

    The technical feasibility of extracting energy from magma bodies is explored. Five aspects of the project are studied: resource location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction.

  2. LIFAC sorbent injection desulfurization demonstration project. Quarterly report No. 4, July--September 1991

    SciTech Connect

    Not Available

    1992-03-06

    In December 1990, the US Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled ``LIFAC Sorbent Injection Desulfurization Demonstration Project.`` The host site for this $17 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75--85% of the sulfur dioxide (SO{sub 2}) in the flue gas. In this report, progress for the period July--September 1991 is covered.

  3. Research, development, and demonstration of nickel-iron batteries for electric vehicle propulsion. Annual report, 1980

    SciTech Connect

    Not Available

    1981-03-01

    The objective of the Eagle-Picher nickel-iron battery program is to develop a nickel-iron battery for use in the propulsion of electric and electric-hybrid vehicles. To date, the program has concentrated on the characterization, fabrication and testing of the required electrodes, the fabrication and testing of full-scale cells, and finally, the fabrication and testing of full-scale (270 AH) six (6) volt modules. Electrodes of the final configuration have now exceeded 1880 cycles and are showing minimal capacity decline. Full-scale cells have presently exceeded 600 cycles and are tracking the individual electrode tests almost identically. Six volt module tests have exceeded 500 cycles, with a specific energy of 48 Wh/kg. Results to date indicate the nickel-iron battery is beginning to demonstrate the performance required for electric vehicle propulsion.

  4. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect

    White, T.; Contos, L.; Adams, L. . Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  5. Ultra-Clean Fischer-Tropsch Fuels Production and Demonstration Project

    SciTech Connect

    Steve Bergin

    2005-10-14

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: Dynamometer Durability Testing, the Denali Bus Fleet Demonstration, Bus Fleet Demonstrations Emissions Analysis, Impact of SFP Fuel on Engine Performance, Emissions Analysis, Feasibility Study of SFPs for Rural Alaska, and Cold Weather Testing of Ultra Clean Fuel.

  6. Project Quinte annual report, 1993. Monitoring report No. 5. Annual publication

    SciTech Connect

    1995-12-31

    This report reviews the activities of Project Quinte, a long-term multi-agency research and monitoring project whose objectives include studying, comparing, and evaluating the Bay of Quinte limnological attributes (biological, physical, and chemical) before and after phosphorus control was implemented at municipal sewage treatment plans. The project also monitors long-term ecosystem responses within the Bay. The report includes papers summarizing research on such topics as phosphorus loadings, hydrology and sediment monitoring, nutrients and phytoplankton, toxic contaminant modeling, benthic fauna, fish populations, and wastewater toxicity.

  7. John Day Watershed Restoration Projects, annual report 2003.

    SciTech Connect

    Brown, Linda

    2004-01-01

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional

  8. Milliken Clean Coal Technology Demonstration Project. Environmental monitoring report, July--September 1996

    SciTech Connect

    1998-05-01

    New York State Electric and Gas Corporation (NYSEG) has installed and is presently operating a high-efficiency flue gas desulfurization (FGD) system to demonstrate innovative emissions control technology and comply with the Clean Air Act Amendments of 1990. The host facility for this demonstration project is NYSEG`s Milliken Station, in the Town of Lansing, New York. The primary objective of this project is to demonstrate a retrofit of energy-efficient SO{sub 2} and NO{sub x} control systems with minimal impact on overall plant efficiency. The demonstration project has added a forced oxidation, formic acid-enhanced wet limestone FGD system, which is expected to reduce SO{sub 2} emissions by at least 90 percent. NYSEG also made combustion modifications to each boiler and plans to demonstrate selective non-catalytic reduction (SNCR) technology on unit 1, which will reduce NO{sub x} emissions. Goals of the proposed demonstration include up to 98 percent SO{sub 2} removal efficiency while burning high-sulfur coal, 30 percent NO{sub x} reductions through combustion modifications, additional NO{sub x} reductions using SNCR technology, production of marketable commercial-grade gypsum and calcium chloride by-products to minimize solid waste disposal, and zero wastewater discharge.

  9. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    SciTech Connect

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  10. Pend Oreille Wetlands Wildlife Mitigation Projects, 2001 Annual Report.

    SciTech Connect

    Entz, Ray D.

    2001-12-05

    The Pend Oreille Wetlands project consists of two adjacent parcels totaling about 600 acres. The parcels make up the northern boundary of the Kalispel Indian Reservation, and is also adjacent to the Pend Oreille River about 25 miles north of Newport and Albeni Falls Dam (Figure 1). Located in the Selkirk Mountains in Pend Oreille County Washington, the project is situated on an active floodplain, increasing its effectiveness as mitigation for Albeni Falls Dam. The combination of the River, wetlands and the north-south alignment of the valley have resulted in an important migratory waterfowl flyway. Washington Department of Fish and Wildlife and Kalispel Natural Resource Department have designated both project sites as priority habitats. Seven habitat types exist on the project properties and include four wetland habitats (open water, emergent, and scrub-shrub and forested), riparian deciduous forest, upland mixed coniferous forest and floodplain meadow. Importance of the project to wildlife is further documented by the occurrence of an active Bald Eagle nest aerie.

  11. Fifteenmile Basin Habitat Improvement Project: 1990 Annual Report.

    SciTech Connect

    Asbridge, Gary M.

    1993-12-01

    U.S.D.A. Forest Service activities in the Fifteenmile basin during 1990 involved the placement of 84 log structures in a two mile reach of Fifteenmile Creek (RM 45.4-47.4) by a combination of falling trees into the channel, bucking in blowdown trees spanning the creek, and winching in existing blowdown and log segments from newly fallen trees. The primary project objective on Fifteenmile Creek was to increase physical habitat diversity and rearing habitat for age l+ winter steelhead trout. USFS personnel also conducted spring spawning surveys in sections of Ramsey and Eightmile Creeks, physical habitat pre-project monitoring in the above project reach, water temperature monitoring, and macroinvertebrate sampling.

  12. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    SciTech Connect

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  13. Industrial Advanced Turbine Systems: Development and Demonstration. Annual report, September 14, 1995--September 30, 1996

    SciTech Connect

    1998-12-31

    The U.S. Department of Energy (DOE) has initiated a program for advanced turbine systems (ATS) that will serve industrial power generation markets. The objective of the cooperative agreements granted under the program is to join the DOE with industry in research and development that will lead to commercial offerings in the private sector. The ATS will provide ultra-high efficiency, environmental superiority, and cost competitiveness. The ATS will foster (1) early market penetration that enhances the global competitiveness of U.S. industry, (2) public health benefits resulting from reduced exhaust gas emissions of target pollutants, (3) reduced cost of power used in the energy-intensive industrial marketplace and (4) the retention and expansion of the skilled U.S. technology base required for the design, development and maintenance of state-of-the-art advanced turbine products. The Industrial ATS Development and Demonstration program is a multi-phased effort. Solar Turbines Incorporated (Solar) has participated in Phases 1 and 2 of the program. On September 14, 1995 Solar was awarded a Cooperative Agreement for Phases 3 and 4 of the program (DE-FC21-95MC31173) by the DOE`s Office of Energy Efficiency and Renewable Energy (EE). Technical administration of the Cooperative Agreement will be provided from EE`s Chicago Operations Office. Contract administration of the Cooperative Agreement will be provided from DOE`s Office of Fossil Energy, Morgantown Energy Technology Center (METC).

  14. The ACT{sup 2} project: Demonstration of maximum energy efficiency in real buildings

    SciTech Connect

    Crawley, D.B.; Krieg, B.L.

    1991-11-01

    A large US utility recently began a project to determine whether the use of new energy-efficient end-use technologies and systems would economically achieve substantial energy savings (perhaps as high as 75% over current practice). Using a field-based demonstration approach, the Advanced Customer Technology Test (ACT{sup 2}) for Maximum Energy Efficiency is providing information on the maximum energy savings possible when integrated packages of new high-efficiency end-use technologies are incorporated into commercial and residential buildings and industrial and agricultural processes. This paper details the underlying rationale, approach, results to date, and future plans for ACT{sup 2}. The ultimate goal is energy efficiency (doing more with less energy) rather than energy conservation (freezing in the dark). In this paper, we first explain why a major United States utility is committed to pursuing demand-side management so aggressively. Next, we discuss the approach the utility chose for conducting the ACT{sup 2} project. We then review results obtained to date from the project`s pilot demonstration site. Last, we describe other related demonstration projects being proposed by the utility.

  15. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are

  16. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

    2001-04-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect

  17. FY2003 LDRD Final Annual Report Article: Pathogen Pathway Project

    SciTech Connect

    Fitch, J P; McCutchen-Maloney, S L

    2003-11-10

    Understanding virulence mechanisms of bacterial pathogens is vital to anticipating biological threats and to improving detectors, vaccines, and treatments. This project will characterize factors responsible for virulence of Yersinia pestis, the causative agent of plague and a biothreat agent, which has an inducible Type III secretion virulence mechanism also found in other animal, plant, and human pathogens. Our approach relies on genomic and proteomic characterization of Y. pestis in addition to a bioinformatic infrastructure. Scientific and technical capabilities developed in this project can be applied to other microbes of interest. This work will establish a significant new direction for biodefense at LLNL and expand our national and international scientific collaborations.

  18. Final Evaluation and Monitoring Report of Demonstration Project for Adult Education "Mobilizing Adult Basic Education".

    ERIC Educational Resources Information Center

    Harris, Dolores M.

    A demonstration adult education project aimed at a rural New Jersey population and involving class sessions 1 evening per week at 6 sites (N=85 students, including 65 caucasians, 10 blacks, and 10 Hispanic) was evaluated in terms of compliance, process, and performance. Compliance monitoring included examination of: visitations; budget; staff…

  19. Secondary Schools Demonstration Project: Program Effects of School-Based Interventions on Antisocial Behaviour

    ERIC Educational Resources Information Center

    Wright, Robin; Offord, David; John, Lindsay; Duku, Eric; DeWit, David

    2005-01-01

    This article describes the methodology and program effects of the Secondary Schools Demonstration Project (SSDP) conducted in four Ontario schools. The objective of the study was to evaluate the extent to which a universal program model of three interventions--cooperative learning; classroom management; and peer-helping approaches that included…

  20. The School Attendance Demonstration Project: Impact Analysis Using an Experimental and Longitudinal Research Design.

    ERIC Educational Resources Information Center

    Harris, Ronald A.

    The School Attendance Demonstration Project (SADP) was designed to improve school attendance among teenagers receiving Aid to Families with Dependent Children (AFDC) benefits in San Diego County, California. An impact study was conducted from March 10, 1996 to March 10, 1998, to evaluate the effects of providing social services and imposing…

  1. 77 FR 19682 - Proposed Information Collection; Wolf Livestock Demonstration Project Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... Fish and Wildlife Service Proposed Information Collection; Wolf Livestock Demonstration Project Grant... the Secretary of the Interior and the Secretary of Agriculture to develop a Wolf Livestock... activities to reduce the risk of livestock loss due to predation by wolves; and Compensate...

  2. 78 FR 67182 - Announcement of Funding Awards for the Section 811 Project Rental Assistance Demonstration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...In accordance with section 102 (a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of funding decisions made by the Department in a competition for funding under the Notice of Funding Availability (NOFA) for the Section 811 Project Rental Assistance Demonstration Program. This announcement contains the names of the awardees and......

  3. DEMONSTRATION PROJECTS UNDER THE U.S. EPA SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) is engaged in an initiative called the Superfund Innovative Technology Evaluation (SITE) program. his program offers a mechanism for conducting joint technology demonstration/evaluation projects between the private sector and EPA. he...

  4. 78 FR 32637 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... notice, published on December 29, 2009 (74 FR 68936-68966). SUMMARY: Section 342(b) of the National... demonstration project was published in the Federal Register on December 29, 2009 (74 FR 68936- 68966). The ECBC....37 (available at http://www.dtic.mil/whs/directives/corres/pdf/140037p.pdf ); 73 FR...

  5. The Outreach Sourcebook, Volume 5: Rural Health Demonstration Projects, 1995 to 1998.

    ERIC Educational Resources Information Center

    Randall, Teri

    In 1995, the federal Office of Rural Health Policy awarded 3-year outreach demonstration grants to 25 projects to provide direct primary and preventive health care services to rural residents in 20 states. The grant program allows recipients to test innovative ideas against persistent problems of rural health care, such as provider shortages,…

  6. INSTRUCTIONAL SYSTEMS DEVELOPMENT--A DEMONSTRATION AND EVALUATION PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    BARSON, JOHN

    FOUR UNIVERSITIES COOPERATED WITH THE INSTRUCTIONAL MEDIA CENTER AT MICHIGAN STATE UNIVERSITY TO TEST, DEMONSTRATE, AND REFINE A MODEL FOR MEDIA INNOVATION AND INSTRUCTIONAL DEVELOPMENT WHICH HAD BEEN DESIGNED IN A EARLIER PROJECT. MEDIA, EVALUATIVE, AND INSTRUCTIONAL SPECIALIST CAPABILITIES WERE TEAMED TO THE DECISION PROCESSES OF THE INSTRUCTORS…

  7. ESL Workplace Literacy Curriculum for a JTPA/Family English Literacy Demonstration Project.

    ERIC Educational Resources Information Center

    Saumweber, Judy; And Others

    A JTPA/FEL (Job Training Partnership Act/Family English Literacy) demonstration project is reported that involves a partnership between the Lao Family Community (LFC) of Minnesota, the City of St. Paul, and St. Paul Public Schools/Adult Basic Education. The goal is to provide workplace literacy instruction to refugees with limited English…

  8. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs.

  9. 20 CFR 670.560 - Is Job Corps authorized to conduct pilot and demonstration projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Is Job Corps authorized to conduct pilot and demonstration projects? 670.560 Section 670.560 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and...

  10. 78 FR 73559 - Renewal of Agency Information Collection for Reporting Systems for Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... of 1992 (as amended) Demonstration Project authorized by OMB Control Number 1076-0135. This... collection conducted under OMB Control Number 1076-0135, Reporting System for Indian Employment, Training... public review, we cannot guarantee that we will be able to do so. III. Data OMB Control Number:...

  11. 78 FR 57623 - TRICARE Over-the-Counter Drug Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    .... On June 15, 2007, the Department of Defense published a notice in the Federal Register (FR) (72 FR..., the Department published a notice in the FR (74 FR 66626- 66627) on December 16, 2009 that extended... of the Secretary TRICARE Over-the-Counter Drug Demonstration Project AGENCY: Office of the...

  12. The Outreach Sourcebook, Volume 7: Rural Health Demonstration Projects, 1997 to 2000.

    ERIC Educational Resources Information Center

    Health Resources and Services Administration (DHHS), Rockville, MD. Office of Rural Health Policy.

    In 1997, the federal Office of Rural Health Policy awarded 3-year outreach demonstration grants to 45 projects to provide direct primary and preventive health care services to rural residents in 28 states. The grant program allows recipients to test innovative ideas against the challenges of rural health care delivery, such as provider shortages,…

  13. 78 FR 60887 - Expressions of Interest (EOI) for Chemical Defense Demonstration Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... preparedness of their emergency management, first responder, and first receiver groups with the knowledge... cities in order to gain input in the demonstration projects (e.g. emergency medical services, fire/hazmat.... Selected SLTT government agencies must work cooperatively with DHS OHA CDP with all phases of...

  14. INITIAL TEST RESULTS OF THE LIMESTONE INJECTION MULTISTAGE BURNER (LIMB) DEMONSTRATION PROJECT

    EPA Science Inventory

    The paper discusses SO2 removal efficiency and low-NOx burner performance obtained during short term tests, as well as the impact of LIMB ash on electrostatic precipitator (ESP) performance at Ohio Edison's Edgewater Station. Project goals are to demonstrate 50% or more SO2 remov...

  15. A Practical Demonstration Project in Teaching Technical Mathematics; Final Progress Report.

    ERIC Educational Resources Information Center

    McHale, Thomas J.; Witzke, Paul T.

    The primary purposes of this developmental and demonstration project were to reduce the number of dropouts and failures and to increase the amount of learning in the technical mathematics core courses. In June 1965 a decision was made to pilot test locally developed programed units in technical mathematics. After the identification of the desired…

  16. Research and Demonstration Projects: Programs for Gifted, January 1990-1991.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Special Education.

    Thirteen research and demonstration projects developed by Ohio school districts for the education of gifted students are described. The programs involve inservice teacher education; interdepartmental teamwork; collaboration with community and university resources; a continuum of services for gifted children in regular classrooms; learning options…

  17. Together is Best: Families and Schools. Findings of the Parent Education Demonstration Project in Region IV.

    ERIC Educational Resources Information Center

    Southern Association of Colleges and Schools, Atlanta, GA.

    The purpose of this first year report of the Region IV Parent Education Demonstration Project (PEDP) is to help other school systems as they plan and conduct parent/child programs. The Region IV PEDP involved 29 local school systems which were conducting 31 parent education programs through various funding sources. These parent programs had as one…

  18. A PLANNED COMMUNITY FOR MIGRATORY FARM WORKERS--A PROPOSAL FOR A DEMONSTRATION PROJECT.

    ERIC Educational Resources Information Center

    PEERY, A.B.

    A DEMONSTRATION PROJECT FOR MIGRATORY FARM LABORERS HOME-BASED IN SOUTH TEXAS IS PROPOSED. THE PURPOSE IS TO DESIGN A PLANNED COMMUNITY CONTAINING HOUSING, HEALTH FACILITIES, ORIENTATION AND EDUCATIONAL FACILITIES, JOB-PLACEMENT FACILITIES, AND SOCIAL, RECREATIONAL, AND COMMERCIAL FACILITIES. THE PLANNED COMMUNITY WOULD PROVIDE SAFE, SANITARY, AND…

  19. Reaching Out to Older Veterans in Need: The Elko Clinic Demonstration Project

    ERIC Educational Resources Information Center

    Juretic, Meghan; Hill, Robert; Luptak, Marilyn; Rupper, Randall; Bair, Byron; Floyd, James; Westfield, Brian; Dailey, Nancy K.

    2010-01-01

    Context: The challenge of providing meaningful health care services to veterans living in rural communities is a major public health concern that involves redefining the traditional facility-based model of care delivery employed in urban areas. Purpose: This paper describes the steps of a demonstration project, the Elko Telehealth Outreach Clinic.…

  20. 78 FR 33051 - Non-Rock Alternatives to Shoreline Protection Demonstration Project (LA-16) Iberia, Jefferson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... Natural Resources Conservation Service Non-Rock Alternatives to Shoreline Protection Demonstration Project (LA-16) Iberia, Jefferson, and Lafourche Parishes, LA AGENCY: Natural Resources Conservation Service... Guidelines (40 CFR part 1500); and the Natural Resources Conservation Service Guidelines (7 CFR part...