Science.gov

Sample records for demonstration unit project

  1. The Habitat Demonstration Unit Project

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Gill, Tracy; Tri, Terry; Howe, Scott

    2009-01-01

    This paper will describe an overview of the NASA-led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a technology-pull project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition. The HDU project will be part of the 2010 Desert Research and Technologies Simulations (DRATS). The purpose of this project is to develop, integrate, test, and evaluate a HDU in the context of the mission architectures and surface operation concepts. This HDU is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. A multi-center approach with be utilized to build, integrate, and test the HDU project through a shared collaborative effort of multiple NASA centers. This project is part of the strategic plan from the ESMD Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment which includes two Lunar Electric Rovers and the HDU during the 2010 analog field test. This paper will describe the overall objectives, its various configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests.

  2. The Habitat Demonstration Unit Project Overview

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Grill, Tracy R.; Tri, Terry O.; Howe, Alan S.

    2010-01-01

    This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support

  3. Habitat Demonstration Unit Project Leadership and Management Strategies

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  4. McIntosh Unit 4 PCFB demonstration project

    SciTech Connect

    Dodd, A.M.; Dryden, R.J.; Morehead, H.T.

    1997-12-31

    The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured into three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.

  5. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  6. TRW utility demonstration unit

    SciTech Connect

    Not Available

    1990-01-01

    The TRW Advanced Entrained Coal Combustor Demonstration Project consists of retrofitting Orange and Rockland (O R) Utility Corporation's Lovett Plant Unit No. 3 with four (4) slagging combustors which will allow the gas/oil unit to fire 2.5% sulfur coal. The slagging combustor process will provide NO{sub x} and SO{sub x} emissions that meet NSPS and New York State Environmental Standards. During this report period, activity continued to address the total program funding shortfall. Ideas and responsibilities for further evaluation have been put forward to reduce the shortfall. In addition, an effort aimed at gaining additional program sponsorships, was initiated.

  7. RM12-2703 Advanced Rooftop Unit Control Retrofit Kit Field Demonstration: Hawaii and Guam Energy Improvement Technology Demonstration Project

    SciTech Connect

    Doebber, I.; Dean, J.; Dominick, J.; Holland, G.

    2014-03-01

    As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This was one of several demonstrations of new and underutilized commercial energy efficiency technologies. The consistent year-round demand for air conditioning and dehumidification in Hawaii provides an advantageous demonstration location for advanced rooftop control (ARC) retrofit kits to packaged rooftop units (RTUs). This report summarizes the field demonstration of ARCs installed on nine RTUs serving a 70,000-ft2 exchange store (large retail) and two RTUs, each serving small office buildings located on Joint Base Pearl Harbor-Hickam (JBPHH).

  8. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  9. UCA{trademark} demonstration project at United Power Association. Final report

    SciTech Connect

    1997-12-01

    Integrated communications, field device interfaces, and control center operations are key aspects of successful distribution automation projects. This project demonstrated substation, feeder, and customer automation functions supported by twelve vendors using EPRI`s Utility Communications Architecture (UCA{trademark}) in an end-to-end implementation of the UCA 2.0 standard. A key project highlight was the ability of the vendor team to achieve the common goal of UCA implementation in a distribution automation setting.

  10. The Habitat Demonstration Unit Project: A Modular Instrumentation System for a Deep Space Habitat

    NASA Technical Reports Server (NTRS)

    Rojdev, Kristina; Kennedy, Kriss J.; Yim, Hester; Williamsn, Robert M.; Hafermalz, Scott; Wagner, Raymond S.

    2011-01-01

    NASA is focused on developing human exploration capabilities in low Earth orbit (LEO), expanding to near Earth asteroids (NEA), and finally to Mars. Habitation is a crucial aspect of human exploration, and a current focus of NASA activities. The Habitation Demonstration Unit (HDU) is a project focused on developing an autonomous habitation system that enables human exploration of space by providing engineers and scientists with a test bed to develop, integrate, test, and evaluate habitation systems. A critical feature of the HDU is the instrumentation system, which monitors key subsystems within the habitat. The following paper will discuss the HDU instrumentation system performance and lessons learned during the 2010 Desert Research and Technology Studies (D-RaTS). In addition, this paper will discuss the evolution of the instrumentation system to support the 2011 Deep Space Habitat configuration, the challenges, and the lessons learned of implementing this configuration. In 2010, the HDU was implemented as a pressurized excursion module (PEM) and was tested at NASA s D-RaTS in Arizona [1]. For this initial configuration, the instrumentation system design used features that were successful in previous habitat instrumentation projects, while also considering challenges, and implementing lessons learned [2]. The main feature of the PEM instrumentation system was the use of a standards-based wireless sensor node (WSN), implementing an IEEE 802.15.4 protocol. Many of the instruments were connected to several WSNs, which wirelessly transmitted data to the command and data handling system via a mesh network. The PEM instrumentation system monitored the HDU during field tests at D-RaTS, and the WSN data was later analyzed to understand the performance of this system. In addition, several lessons learned were gained from the field test experience, which fed into the instrumentation design of the next generation of the HDU.

  11. Nucla CFB Demonstration Project

    SciTech Connect

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  12. Integrated Gasification Combined Cycle (IGCC) demonstration project, Polk Power Station -- Unit No. 1. Annual report, October 1993--September 1994

    SciTech Connect

    1995-05-01

    This describes the Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project which will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,300 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 Btu/scf (LHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product.

  13. LIMB demonstration project extension

    SciTech Connect

    Not Available

    1990-09-21

    The purpose of the DOE limestone injection multistage burner (LIMB) Demonstration Project Extension is to extend the data base on LIMB technology and to expand DOE's list of Clean Coal Technologies by demonstrating the Coolside process as part of the project. The main objectives of this project are: to demonstrate the general applicability of LIMB technology by testing 3 coals and 4 sorbents (total of 12 coal/sorbent combinations) at the Ohio Edison Edgewater plant; and to demonstrate that Coolside is a viable technology for improving precipitator performance and reducing sulfur dioxide emissions while acceptable operability is maintained. Progress is reported. 3 figs.

  14. PFBC Utility Demonstration Project

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  15. ALASKA VILLAGE DEMONSTRATION PROJECTS

    EPA Science Inventory

    Two demonstration projects were built as authorized by Section 113 of PL 92-500. Modular construction was used to provide central utility systems which included water supply, laundry, bathing, saunas, and wastewater treatment. Service to homes was by vehicular delivery. Fire dest...

  16. SOIL BIOVENTING DEMONSTRATION PROJECT

    EPA Science Inventory

    A pilot scale demonstration project of a soil bioventing system, which utilizes the biodegradation in soil and physical removal of VOC by induced air flow, is in operation at the U.S. Coast Guard Aviation Field in Traverse City, Michigan. he system is being tested to determine it...

  17. LIMB Demonstration Project Extension and Coolside Demonstration

    SciTech Connect

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO[sub 2]) and nitrogen oxides (NO[sub x]) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison's Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0[sub 2] removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0[sub 2] emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  18. ARJIS satellite demonstration project

    NASA Astrophysics Data System (ADS)

    Severance, Steve; Williams, Carl

    2005-06-01

    In 2003, the California Space Authority (CSA) was provided funding by the U. S. Congress through the Defense Appropriations Act to develop a project that would demonstrate the U.S. space enterprise capability that would contribute to the effectiveness of those engaged in Homeland Security. The project was given broad latitude in selecting the area of Homeland Security to be addressed and the nature of the space technology to be applied. CSA became aware of a nascent law enforcement data-sharing project in the San Diego region known as the Automated Regional Justice Information System (ARJIS). First developed by the police departments in San Diego, ARJIS is an innovative system that shares criminal justice information among 50 federal, state, and local agencies. ARJIS was completing a pilot project that enabled officers to receive information on handheld computers, which was transmitted wirelessly through cellular networks. The accessed information came from several databases that collectively contained the entire region's crime and arrest reports, traffic citations, and incidents, as well as state and county wants and warrants. The fundamental limitations that plague all cellular-based devices caught CSA's attention and resulted in a cooperative effort to harden the communications link between the patrol officer and critical data. The principal goal of the SATCOM development task was to create a proof-of-concept application that would use SATCOM links to augment the current ARJIS handheld wireless (cellular) capability. The successful technical demonstration and the positive support for satellite communications from the law enforcement community showed that this project filled a need-both for improved information sharing and for highly reliable communications systems.

  19. LIFAC Demonstration at Richmond Power and Light Whitewater Valley Unit No. 2 Volume II: Project Performance and Economics

    SciTech Connect

    None, None

    1998-04-01

    The C1ean Coal Technology (CCT) Program has been recognized in the National Energy Strategy as a major initiative whereby coal will be able to reach its full potential as a source of energy for the nation and the international marketplace. Attainment of this goal depends upon the development of highly efficient, environmentally sound, competitive coal utilization technologies responsive to diverse energy markets and varied consumer needs. The CCT Program is an effort jointly funded by government and industry whereby the most promising of the advanced coal-based technologies are being moved into the marketplace through demonstration. The CCT Program is being implemented through a total of five competitive solicitations. LIFAC North America, a joint venture partnership of ICF Kaiser Engineers, Inc., and Tampella Power Corporation, is currently demonstrating the LIFAC flue gas desulfurization technology developed by Tampella Power. This technology provides sulfur dioxide emission control for power plants, especially existing facilities with tight space limitations. Sulfur dioxide emissions are expected to be reduced by up to 85% by using limestone as a sorbent. The LIFAC technology is being demonstrated at Whitewater Valley Unit No. 2, a 60-MW coal-fired power plant owned and operated by Richmond Power and Light (RP&L) and located in Richmond, Indiana. The Whitewater plant consumes high-sulfur coals, with sulfur contents ranging from 2.0-2.9 $ZO. The project, co-funded by LIFAC North America and DOE, is being conducted with the participation of Richmond Power and Light, the State of Indiana, the Electric Power Research Institute (EPRI), and the Black Beauty Coal Company. The project has a total cost of $21.4 million and a duration of 48 months from the preliminary design phase through the testing program.

  20. Smart Grid Demonstration Project

    SciTech Connect

    Miller, Craig; Carroll, Paul; Bell, Abigail

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  1. Tidd PFBC demonstration project

    SciTech Connect

    Marrocco, M.

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  2. Toms Creek IGCC Demonstration Project

    SciTech Connect

    Virr, M.J.

    1992-01-01

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020[degree]F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  3. Toms Creek IGCC Demonstration Project

    SciTech Connect

    Virr, M.J.

    1992-11-01

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020{degree}F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  4. CONNECT Special Demonstration Project.

    ERIC Educational Resources Information Center

    Hawk, Kim; And Others

    Project CONNECT (Inmate Advocacy) was developed to provide counseling to inmates involved in the education programs at Fayette County Prison in Uniontown, Pennsylvania, before and immediately following their release. Twenty-one inmates who had been selected through a screening process received individual basic skills remediation in a classroom…

  5. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1989-06-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  6. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1989-11-15

    The basic goal of the Limestone Injection Mitigation Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  7. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1989-03-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  8. LIMB Demonstration Project Extension

    SciTech Connect

    Not Available

    1988-12-15

    The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

  9. TIDD PFBC Demonstration Project

    SciTech Connect

    Not Available

    1994-03-01

    In fluidized bed combustion, coal and sorbent (dolomite or limestone) are fed into a boiler in which air, entering from the bottom, maintains the bed material in a highly turbulent suspended state called fluidization. This turbulence creates good contact between the air and fuel, allowing for high combustion efficiency and excellent adsorption of sulfur dioxide (SO{sub 2}) during the combustion process. In PFBC applications, pressurized air is supplied to the combustor. Pressurizing the air concentrates a larger quantity of oxygen per unit volume. This results in a lower velocity of air through the fuel bed. The lower velocity reduces the total height required for the bed and freeboard above the bed. Also, a smaller plan area is required for the bed area as compared to an atmospheric fluidized bed. This has the advantage of requiring a much smaller pressure vessel to contain the boiler enclosure. The mean bed temperature of a pressurized fluidized bed combustor is typically maintained in the range 1540 to 1580 F. This is well below the ash fusion temperature of coal, yet above the ignition temperature of the coal. Advantages of the low bed temperature are no slag formation and a reduction of NO{sub x} emissions to less than half that of a conventional boiler. The Tidd Plant is a combined cycle pressurized fluidized bed combustion system with a topping gas cycle and a bottoming steam cycle.

  10. Solar Thermal Demonstration Project

    SciTech Connect

    Biesinger, K; Cuppett, D; Dyer, D

    2012-01-30

    HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with Kalwall building panels. An added feature of the Kalwall system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

  11. Measuring Impact of Demonstration Projects.

    ERIC Educational Resources Information Center

    Fleischman, Howard L.

    A proposed evaluation model for measuring the impact of demonstration projects in vocational education defines sets of criteria, standards, and documentation for both interim and final acceptable evidence of project impact. Interim acceptable evidence is that evidence of project success which should be expected during the demonstration grant…

  12. VLBI2010 Demonstrator Project

    NASA Astrophysics Data System (ADS)

    Niell, A.

    2008-12-01

    . Observations demonstrating the full four-band configuration are planned for October. In this talk the results of these tests, the improvements that are anticipated for the operational VLBI2010 network, and the status of other developments in the next generation of geodetic VLBI systems will be presented. * Bruce Whittier, Mike Titus, Jason SooHoo, Dan Smythe, Alan Rogers, Jay Redmond, Mike Poirier, Chuck Kodak, Alan Hinton, Ed Himwich, Skip Gordon, Mark Evangelista, Irv Diegel, Brian Corey, Tom Clark, Chris Beaudoin (in reverse alphabetical order)

  13. Demonstration Projects: Implementation and Institutionalization.

    ERIC Educational Resources Information Center

    Bina, James V.; Hull, William L.

    Three purposes are listed for this paper: (1) to share the results of a national survey of vocational education exemplary projects; (2) to emphasize the importance of a project director's communication with five clientele audiences; and (3) to suggest specific actions likely to result in institutionalization of a demonstration project. A brief…

  14. Earth Science Capability Demonstration Project

    NASA Technical Reports Server (NTRS)

    Cobleigh, Brent

    2006-01-01

    A viewgraph presentation reviewing the Earth Science Capability Demonstration Project is shown. The contents include: 1) ESCD Project; 2) Available Flight Assets; 3) Ikhana Procurement; 4) GCS Layout; 5) Baseline Predator B Architecture; 6) Ikhana Architecture; 7) UAV Capability Assessment; 8) The Big Picture; 9) NASA/NOAA UAV Demo (5/05 to 9/05); 10) NASA/USFS Western States Fire Mission (8/06); and 11) Suborbital Telepresence.

  15. Plasma hearth process demonstration project

    SciTech Connect

    Geimer, R.M.; Gillins, R.L.

    1995-12-31

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the US Department of Energy (DOE) Office of Technology Development Mixed Waste Focus Area. The PHP is a high temperature thermal treatment process using a plasma arc torch in a stationary, refractory lined chamber that destroys organics and stabilizes the residuals in a nonleaching, vitrified waste form, greatly improving the disposability of the waste. This paper describes the PHP system and summarizes test results to date, including volume reduction, destruction and removal efficiencies for organic wastes, and emission characteristics. Tests performed so far demonstrate that the PHP adresses DOE mixed waste final waste form requirements and US Environmental Protection Agency Toxicity Characteristic Leaching Procedure requirements.

  16. Industrial heat pump demonstration project

    SciTech Connect

    Not Available

    1988-09-01

    This booklet describes an industrial heat pump demonstration project conducted at a plant in Norwich, New York. The project required retrofitting an open-cycle heat pump to a single-effect, recirculating-type evaporator. The heat pump design uses an electrically driven centrifugal compressor to recover the latent heat of the water vapor generated by the evaporator. The compressed vapor is returned to the process, where it displaces the use of boiler steam. The goal was to reduce costs associated with operating the evaporator, which is used for reduction the water content of whey (a liquid by-product from cheese production). The retrofit equipment has now completed more than one year of successful operation. Heat pump coefficient of performance has been measured and is in the range of 14 to 18 under varying process conditions. Generalization of project results indicates that the demonstrated technology achieved attractive economics over a wide range of energy price assumptions, especially when the heat pump is applied to larger processes. 5 refs., 17 figs.

  17. Clean Coal Diesel Demonstration Project

    SciTech Connect

    Robert Wilson

    2006-10-31

    A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

  18. Exploration Medical System Demonstration Project

    NASA Technical Reports Server (NTRS)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  19. LIFAC sorbent injection desulfurization demonstration project

    SciTech Connect

    Not Available

    1992-03-06

    In December 1990, the US Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled LIFAC Sorbent Injection Desulfurization Demonstration Project.'' The host site for this $17 million, three-phase project is Richmond Power and Light's Whitewater Valley Unit No. 2 in Richmond, Indiana. The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75--85% of the sulfur dioxide (SO{sub 2}) in the flue gas. In this report, progress for the period July--September 1991 is covered.

  20. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1998-04-08

    This project deals with the demonstration of a coking reactor (Process Development Unit-- PDU-11) using Calderon's proprietary technology for making commercially acceptable coke. The activities of the past quarter were focused on the following: 1. Testing and Designing of the Submerged Quenching Closed System for the Process; 2. Usage of the Cracked Desulfurized Gas as a Reducing Gas to Make Directly Reduced Iron (DRI) in Order to Make the Process Economics Viable; 3. Changes in the Ceramic Liners for Supporting Them in the Coking Reactor; 4. Work Towards Testing of U.S. Steel's Coal in the Existing Process Development Unit in Alliance (PDU-1); 5. Permitting.

  1. LIMB Demonstration Project Extension and Coolside Demonstration. [Final report

    SciTech Connect

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison`s Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0{sub 2} removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0{sub 2} emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  2. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1999-06-23

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (4) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (5) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Detailed studies of LTV's site for the installation of the commercial Demonstration Unit with site specific layouts; Environmental Work; Firm commitments for funding from the private sector; and Federal funding to complement the private contribution.

  3. The Habitat Demonstration Unit System Integration

    NASA Technical Reports Server (NTRS)

    Gill, Tracy R.; Kennedy, Kriss J.; Tri, Terry O.; Howe, Alan S.

    2010-01-01

    The Lunar Surface System Habitat Demonstration Unit (HDU) will require a project team to integrate a variety of contributions from National Aeronautics and Space Administration (NASA) centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the first version of the HDU, the Pressurized Excursion Module (PEM), from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Laboratory, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into HDU PEM are planned to facilitate the integration process. A coordinated effort to establish simplified Computer Aided Design (CAD) standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU design to maximize the efficiency of both integration and field operations.

  4. Habitat Demonstration Unit - Deep Space Habitat Configuration

    NASA Video Gallery

    This animated video shows the process of transporting, assembling and testing the Habitat Demonstration Unit - Deep Space Habitat (HDU DSH) configuration, which will be deployed during the 2011 Des...

  5. Calderon Cokemaking Process/Demonstration Project

    SciTech Connect

    1998-04-08

    This project deals with the demonstration of a coking process using proprietary technology of Calderon with the following objectives in order to enable its commercialization: (i) making coke of such quality as to be suitable for use in high driving (highly productive) blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; and (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process. The activities of the past quarter were entirely focused on operating the Calderon Process Development Unit (PDU-I) in Alliance, Ohio conducting a series of tests under steady state using coal from Bethlehem Steel and U.S. Steel in order to demonstrate the above. The objectives mentioned above were successfully demonstrated.

  6. Integration Process for the Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Gill, Tracy; Merbitz, Jerad; Kennedy, Kriss; Tri, Terry; Howe, A. Scott

    2010-01-01

    The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities The HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture To complete the development of the HDU from conception in June 2009 to rollout for operations in July 2010, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads, such as the Geology Lab, that those systems will support The utilization of interface design standards and uniquely tailored reviews have allowed for an accelerated design process Scheduled activities include early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development Modeling tools have been effective in hardware systems layout, cable routing and length estimation, and human factors analysis Decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations Incremental test operations leading up to an integrated systems test allows for an orderly systems test program The HDU will begin its journey as an emulation of a Pressurized Excursion Module (PEM) for 2010 field testing and then may evolve to a Pressurized Core Module (PCM) for 2011 and later field tests, depending on agency architecture decisions The HDU deployment will vary slightly from current lunar architecture plans to include developmental hardware and software items and additional systems called opportunities for technology demonstration One of the HDU challenges has been designing to be prepared for the integration of

  7. Mississippi Labor Mobility Demonstration Project.

    ERIC Educational Resources Information Center

    Huff, H. Pope; Salter, Leo G.

    The project concentrated on providing intrastate relocation assistance to disadvantaged rural workers in Mississippi, with a flexible minimum of supportive service. Assistance consisted of counseling, providing housing, travel arrangements, job interviews, job development, financial aid, and recruiting the unemployed. (Author)

  8. The Habitat Demonstration Unit System Integration

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Gill, Tracy; Tri, Terry; Howe, Scott

    2009-01-01

    The Lunar Surface System Habitat Demonstration Unit (HDU) will require the project team to integrate a variety of contributions from NASA centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the HDU from conception in June 2009 to rollout for operations in July 2010, the HDU team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of HDU and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU. A coordinated effort to establish simplified Computer Aided Design standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations.

  9. Large-scale CFB combustion demonstration project

    SciTech Connect

    Nielsen, P.T.; Hebb, J.L.; Aquino, R.

    1998-07-01

    The Jacksonville Electric Authority's large-scale CFB demonstration project is described. Given the early stage of project development, the paper focuses on the project organizational structure, its role within the Department of Energy's Clean Coal Technology Demonstration Program, and the projected environmental performance. A description of the CFB combustion process in included.

  10. Large-scale CFB combustion demonstration project

    SciTech Connect

    Nielsen, P.T.; Hebb, J.L.; Aquino, R.

    1998-04-01

    The Jacksonville Electric Authority`s large-scale CFB demonstration project is described. Given the early stage of project development, the paper focuses on the project organizational structure, its role within the Department of Energy`s Clean Coal Technology Demonstration Program, and the projected environmental performance. A description of the CFB combustion process is included.

  11. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  12. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  13. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  14. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  15. 40 CFR 117.14 - Demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Demonstration projects. 117.14 Section... DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS SUBSTANCES Applicability § 117.14 Demonstration projects... research or demonstration projects relating to the prevention, control, or abatement of hazardous...

  16. Vehicle to Grid Demonstration Project

    SciTech Connect

    Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

    2010-12-31

    This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

  17. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    2000-09-19

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (iv) conducting a blast furnace test to demonstrate the compatibility of the coke produced; (v) demonstrating that coke can be produced economically, at a level competitive with coke imports; and (vi) applying the Calderon technology to making additional iron units. The activities of the past quarter were focused on the following: (1) Bethlehem Steel's withdrawal and efforts expended to substitute U.S. Steel for Bethlehem; (2) Assessment work performed with U.S. Steel to show that the Calderon Technology has merit and would add to U.S. Steel's economic benefit by being involved in it, including for making additional iron units; (3) Addressing material selection and heat input capacity to increase heat input into the processing reactor by actual modeling of such approach; (4) Construction of two full size courses of heating tiles to verify the manufacturing and the fitting of the tiles with one another; (5) Making available equipment to test carbon deposition on sorbent; and (6) Permitting issues.

  18. Nucla circulating atmospheric fluidized bed demonstration project

    SciTech Connect

    Keith, Raymond E.

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute's decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  19. Integration Process for the Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Gill, Tracy; Merbitz, Jerad; Kennedy, Kriss; Tn, Terry; Toups, Larry; Howe, A. Scott; Smitherman, David

    2011-01-01

    The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities. The HDU previously served as a test bed for testing technologies and sub-systems in a terrestrial surface environment. in 2010 in the Pressurized Excursion Module (PEM) configuration. Due to the amount of work involved to make the HDU project successful, the HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators The size of the team and number of systems involved With the HDU makes Integration a complicated process. However, because the HDU shell manufacturing is complete, the team has a head start on FY--11 integration activities and can focus on integrating upgrades to existing systems as well as integrating new additions. To complete the development of the FY-11 HDU from conception to rollout for operations in July 2011, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads. The highlighted HDU work for FY-11 will focus on performing upgrades to the PEM configuration, adding the X-Hab as a second level, adding a new porch providing the astronauts a larger work area outside the HDU for EVA preparations, and adding a Hygiene module. Together these upgrades result in a prototype configuration of the Deep Space Habitat (DSH), an element under evaluation by NASA's Human Exploration Framework Team (HEFT) Scheduled activates include early fit-checks and the utilization of a Habitat avionics test bed prior to installation into HDU. A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development. Modeling tools have been effective in hardware systems layout, cable routing, sub-system interface length estimation and human factors analysis. Decision processes on integration and use of all new subsystems will be defined early in the project to

  20. Secure Interoperable Open Smart Grid Demonstration Project

    SciTech Connect

    Magee, Thoman

    2014-12-31

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG

  1. Navy fuel cell demonstration project.

    SciTech Connect

    Black, Billy D.; Akhil, Abbas Ali

    2008-08-01

    This is the final report on a field evaluation by the Department of the Navy of twenty 5-kW PEM fuel cells carried out during 2004 and 2005 at five Navy sites located in New York, California, and Hawaii. The key objective of the effort was to obtain an engineering assessment of their military applications. Particular issues of interest were fuel cell cost, performance, reliability, and the readiness of commercial fuel cells for use as a standalone (grid-independent) power option. Two corollary objectives of the demonstration were to promote technological advances and to improve fuel performance and reliability. From a cost perspective, the capital cost of PEM fuel cells at this stage of their development is high compared to other power generation technologies. Sandia National Laboratories technical recommendation to the Navy is to remain involved in evaluating successive generations of this technology, particularly in locations with greater environmental extremes, and it encourages their increased use by the Navy.

  2. Medium Duty Electric Vehicle Demonstration Project

    SciTech Connect

    Mackie, Robin J. D.

    2015-05-31

    The Smith Electric Vehicle Demonstration Project (SDP) was integral to the Smith business plan to establish a manufacturing base in the United States (US) and produce a portfolio of All Electric Vehicles (AEV’s) for the medium duty commercial truck market. Smith focused on the commercial depot based logistics market, as it represented the market that was most ready for the early adoption of AEV technology. The SDP enabled Smith to accelerate its introduction of vehicles and increase the size of its US supply chain to support early market adoption of AEV’s that were cost competitive, fully met the needs of a diverse set of end users and were compliant with Federal safety and emissions requirements. The SDP accelerated the development and production of various electric drive vehicle systems to substantially reduce petroleum consumption, reduce vehicular emissions of greenhouse gases (GHG), and increase US jobs.

  3. Composite Cryotank Technologies and Demonstration Project

    NASA Video Gallery

    The Composite Cryogenic Propellant Tank project will develop and ground demonstrate large-scale composite cryogenic propellant tanks applicable to heavy-lift launch vehicles, propellant depots, and...

  4. Education & Collection Facility GSHP Demonstration Project

    SciTech Connect

    Joplin, Jeff

    2015-03-28

    The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to a recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an efficient

  5. The Wisconsin Rural Development Demonstration Project.

    ERIC Educational Resources Information Center

    McCoy, Palmer E.; Jones, Eleanor

    Nineteen Wisconsin counties were the site of the four-year Rural Development Demonstration Project, one of five such projects in the nation. Among the project's objectives were to accelerate sound economic, social, cultural and environmental development and to provide alternatives for living in non-metropolitan areas while providing greater…

  6. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    NASA Technical Reports Server (NTRS)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  7. Alkaline Waterflooding Demonstration Project, Ranger Zone, Long Beach Unit, Wilmington Field, California. Fourth annual report, June 1979-May 1980. Volume 3. Appendices II-XVII

    SciTech Connect

    Carmichael, J.D.

    1981-03-01

    Volume 3 contains Appendices II through XVII: mixing instructions for sodium orthosilicate; oil displacement studies using THUMS C-331 crude oil and extracted reservoir core material from well B-110; clay mineral analysis of B-827-A cores; sieve analysis of 4 Fo sand samples from B-110-IA and 4 Fo sand samples from B-827-A; core record; delayed secondary caustic consumption tests; long-term alkaline consumption in reservoir sands; demulsification study for THUMS Long Beach Company, Island White; operating plans and instructions for DOE injection demonstration project, alkaline injection; caustic pilot-produced water test graphs; well test irregularities (6/1/79-5/31/80); alkaline flood pump changes (6/1/79-5/31/80); monthly DOE pilot chemical waterflood injection reports (preflush injection, alkaline-salt injection, and alkaline injection without salt); and caustic safety procedures-alkaline chemicals.

  8. PFBC Utility Demonstration Project. Annual report, 1991

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  9. Three-stage combustion demonstration projects update

    SciTech Connect

    Ashworth, B.; Zawadzki, E.; Murrell, F.; Shroyer, D.; Gallenbach, T.

    2000-07-01

    The Ashworth Combustor is a pulverized coal-fired system that reduces the three major air pollutants (NO{sub x}, SO{sub 2} and particulate) associated with coal combustion. A 50 million Btu/hr combustion system will be retrofitted to a stoker boiler at the Lincoln Development Center in Lincoln, Illinois. Startup and testing re scheduled for mid 2000. With this technology, a two-stage slagging combustor is used with furnace over-fire air (the third stage). Pulverized coal/limestone are fired/calcined in the combustor. limestone (lime) is added to flux the slag and capture sulfur in a molten slag eutectic as a non-leaching calcium sulfide. Beside deep NO{sub x} reduction, 70%+SO{sub 2} and 70 to 80% particulate reductions are projected for the Ashworth Combustor. ClearStack, the Illinois Department of Commerce and Community Affairs Office of Coal Development and Marketing and the Ohio Coal Development Office (OCDO) are sponsoring the Ashworth Combustor demonstration. The Stage3Cyclone is a simple retrofit to cyclone-fired boilers to reduce NO{sub x} emissions to low levels. The existing cyclone barrels are used as the first stage of combustion and the conventional cyclone feed coal size (-1/4 inch) is used. Limestone is added to flux the coal ash. Second stage air is added in the furnace at the re-entrant throat level followed by over-fire air (OFA) injection in the upper part of the furnace. The technique is to be demonstrated on a southern Illinois Power Cooperative 33 MWe cyclone-fired unit in Marion, Illinois. Funding arrangements are being made and testing is projected for late 2000.

  10. Tidd PFBC Demonstration Project, A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-31

    The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

  11. Model Tech Prep Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Southern Maryland Educational Consortium, La Plata.

    The Southern Maryland Educational Consortium's Tech Prep Model Demonstration project is described in this final report. The consortium members are Calvert, Charles, and St. Mary's county school districts and Charles County Community College in southern Maryland. The project is based on a 4 + 2 model in which ninth-grade students develop career…

  12. Formal methods demonstration project for space applications

    NASA Technical Reports Server (NTRS)

    Divito, Ben L.

    1995-01-01

    The Space Shuttle program is cooperating in a pilot project to apply formal methods to live requirements analysis activities. As one of the larger ongoing shuttle Change Requests (CR's), the Global Positioning System (GPS) CR involves a significant upgrade to the Shuttle's navigation capability. Shuttles are to be outfitted with GPS receivers and the primary avionics software will be enhanced to accept GPS-provided positions and integrate them into navigation calculations. Prior to implementing the CR, requirements analysts at Loral Space Information Systems, the Shuttle software contractor, must scrutinize the CR to identify and resolve any requirements issues. We describe an ongoing task of the Formal Methods Demonstration Project for Space Applications whose goal is to find an effective way to use formal methods in the GPS CR requirements analysis phase. This phase is currently under way and a small team from NASA Langley, ViGYAN Inc. and Loral is now engaged in this task. Background on the GPS CR is provided and an overview of the hardware/software architecture is presented. We outline the approach being taken to formalize the requirements, only a subset of which is being attempted. The approach features the use of the PVS specification language to model 'principal functions', which are major units of Shuttle software. Conventional state machine techniques form the basis of our approach. Given this background, we present interim results based on a snapshot of work in progress. Samples of requirements specifications rendered in PVS are offered to illustration. We walk through a specification sketch for the principal function known as GPS Receiver State processing. Results to date are summarized and feedback from Loral requirements analysts is highlighted. Preliminary data is shown comparing issues detected by the formal methods team versus those detected using existing requirements analysis methods. We conclude by discussing our plan to complete the remaining

  13. 78 FR 22527 - TRICARE Access to Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... of the Secretary TRICARE Access to Care Demonstration Project AGENCY: Department of Defense. ACTION: Notice of Extension of the TRICARE South Region United States Coast Guard Access to Care Demonstration... fiscal year to TRICARE authorized Urgent Care Centers without obtaining an authorization from...

  14. X-43C Flight Demonstrator Project Overview

    NASA Technical Reports Server (NTRS)

    Moses, Paul L.

    2003-01-01

    The X-43C Flight Demonstrator Project is a joint NASA-USAF hypersonic propulsion technology flight demonstration project that will expand the hypersonic flight envelope for air-breathing engines. The Project will demonstrate sustained accelerating flight through three flights of expendable X-43C Demonstrator Vehicles (DVs). The approximately 16-foot long X-43C DV will be boosted to the starting test conditions, separate from the booster, and accelerate from Mach 5 to Mach 7 under its own power and autonomous control. The DVs will be powered by a liquid hydrocarbon-fueled, fuel-cooled, dual-mode, airframe integrated scramjet engine system developed under the USAF HyTech Program. The Project is managed by NASA Langley Research Center as part of NASA's Next Generation Launch Technology Program. Flight tests will be conducted by NASA Dryden Flight Research Center off the coast of California over water in the Pacific Test Range. The NASA/USAF/industry project is a natural extension of the Hyper-X Program (X-43A), which will demonstrate short duration (approximately 10 seconds) gaseous hydrogen-fueled scramjet powered flight at Mach 7 and Mach 10 using a heavy-weight, largely heat sink construction, experimental engine. The X-43C Project will demonstrate sustained accelerating flight from Mach 5 to Mach 7 (approximately 4 minutes) using a flight-weight, fuel-cooled, scramjet engine powered by much denser liquid hydrocarbon fuel. The X-43C DV design flows from integrating USAF HyTech developed engine technologies with a NASA Air-Breathing Launch Vehicle accelerator-class configuration and Hyper-X heritage vehicle systems designs. This paper describes the X-43C Project and provides the background for NASA's current hypersonic flight demonstration efforts.

  15. Project CAPABLE: Model Unit.

    ERIC Educational Resources Information Center

    Madawaska School District, ME.

    Project CAPABLE (Classroom Action Program: Aim: Basic Learning Effectiveness) is a classroom approach which integrates the basic learning skills with content. The goal of the project is to use basic learning skills to enhance the learning of content and at the same time use the content to teach basic learning skills. This manual illustrates how…

  16. Development, Evaluation, and Use of Programmed Materials. A Report on the Activities of the Materials Development Unit, MDT Vocational Experimental-Demonstration Project.

    ERIC Educational Resources Information Center

    McKee, John M.; And Others

    The project described in this report attempted to provide a special project for the selection, counseling, testing, assessment, training, placement, and follow-up of prison inmates whose many problems prevented their profiting from conventional programs in vocational training. The mathematical approach to programing was used in developing the…

  17. Brown Grease to Biodiesel Demonstration Project Report

    SciTech Connect

    San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

    2013-01-30

    program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP's anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project's environmental impacts were expected to include: Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biodiesel and Methane gas produced in the Anaerobic digester, Carbon Dioxide, is also a greenhouse gas; it is 20 times weaker for the same amount (per mole

  18. Prototypical Consolidation Demonstration Project: Final report

    SciTech Connect

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy`s Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG&G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG&G Idaho`s assessments of the equipment and procedures developed by NUS.

  19. RESOLVE OVEN Field Demonstration Unit for Lunar Resource Extraction

    NASA Technical Reports Server (NTRS)

    Paz, Aaron; Oryshchyn, Lara; Jensen, Scott; Sanders, Gerald B.; Lee, Kris; Reddington, Mike

    2013-01-01

    The Oxygen and Volatile Extraction Node (OVEN) is a subsystem within the Regolith & Environment Science and Oxygen & Lunar Volatile Extraction (RESOLVE) project. The purpose of the OVEN subsystem is to release volatiles from lunar regolith and extract oxygen by means of a hydrogen reduction reaction. The complete process includes receiving, weighing, sealing, heating, and disposing of core sample segments while transferring all gaseous contents to the Lunar Advanced Volatile Analysis (LAVA) subsystem. This document will discuss the design and performance of the OVEN Field Demonstration Unit (FDU), which participated in the 2012 RESOLVE field demonstration.

  20. Integrated Ground Operations Demonstration Units Testing Plans and Status

    NASA Technical Reports Server (NTRS)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  1. FIELD DEMONSTRATION AND QUALITY ASSURANCE PROJECT PLAN

    EPA Science Inventory

    The Demonstration of innovative field devices for the measurement of mercury in soil and sediment is being conducted under the EPA's SITE Program in February 2003 at the United States Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee and th...

  2. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    1998-12-23

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Conducting bench-scale tests to produce coke and acceptable tar from the process to satisfy Koppers, a prospective stakeholder; Consolidation of the project team players to execute the full size commercial cokemaking reactor demonstration; and Progress made in advancing the design of the full size commercial cokemaking reactor.

  3. A Rural Citizens Health Promotion Demonstration Project.

    ERIC Educational Resources Information Center

    Sutherland, Mary; And Others

    1989-01-01

    This article describes a health promotion demonstration project which addressed the health problem of hypertension, as related to variables of excercise, weight, blood pressure measurement and reduction, medication compliance, and nutritional practices. Participants (N=18) were senior citizens who were associated with a small, rural, predominantly…

  4. ELKINS MINE DRAINAGE POLLUTION CONTROL DEMONSTRATION PROJECT

    EPA Science Inventory

    In 1964 several federal agencies in cooperation with the State of West Virginia initiated a project to demonstrate methods to control the pollution from abandoned underground and surface mines in the Roaring Creek-Grassy Run Watersheds near Elkins, West Virginia. The Roaring Cree...

  5. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    SciTech Connect

    Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  6. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    SciTech Connect

    Not Available

    1992-02-01

    The report summarizes unit operating experience and test program progress for 1989 on Colorado-Ute Electric Association's Nucla CFB Demonstration Program. During this period, the objectives of the Nucla Station operating group were to correct problems with refractory durability, resolve primary air fan capacity limitations, complete the high ash and high sulfur coal tests, switch to Salt Creek coal as the operating fuel, and make the unit available for testing without capacity restrictions. Each of these objectives was addressed and accomplished, to varying degrees, except for the completion of the high sulfur coal acceptance tests. (VC)

  7. Final Report - Navajo Electrification Demonstration Project - FY2004

    SciTech Connect

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  8. Advanced secondary recovery demonstration for the Sooner Unit

    SciTech Connect

    Sippel, M.; Junkin, J.; Pritchett, R.; Hardage, B.

    1993-02-24

    The objectives of the project are to demonstrate the effectiveness of geologically targeted infill drilling and improved reservoir management to obtain maximum oil recovery from the Sooner Unit field using water injection and gas recycling as secondary methods. The first phase of the project involves an integrated multi-discipline approach to identify optimum well sites and development of a reservoir operations plan. The second phase will involve drilling of up to three geologically targeted infill wells and establishing production/injection schedules. Reservoir simulation, transient well tests and careful production monitoring will be used to evaluate the results. The third phase will involve technology transfer through a series of technical papers and presentations of a short course. Emphasis will be on the economics of the project and the implemented technologies. Summary of technical progress is presented for: Well drilling and completion; seismic data acquisition; and geologic and engineering interpretation.

  9. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1996-06-21

    This project deals with the demonstration of a full size commercial coking retort using Calderon's novel process for making metallurgical coke. Tests are currently being conducted on a heat resistant alloy by subjecting such alloy to raw gases from an actual operating coke oven at LTV Steel's coke plant in Warren, Ohio to determine the effects of sulfurous gases on the alloy before ordering 232,000 lbs of this alloy for the full size commercial coking retort. Design engineering is proceeding.

  10. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  11. Advanced Coal Conversion Process Demonstration Project

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  12. Baltimore residential assistance demonstration project: Final report

    SciTech Connect

    1998-09-01

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  13. Southern Nevada Alternative Fuels Demonstration Project

    SciTech Connect

    Hyde, Dan; Fast, Matthew

    2009-12-31

    The Southern Nevada Alternative Fuels Program is designed to demonstrate, in a day-to-day bus operation, the reliability and efficiency of a hydrogen bus operation under extreme conditions. By using ICE technology and utilizing a virtually emission free fuel, benefits to be derived include air quality enhancement and vehicle performance improvements from domestically produced, renewable energy sources. The project objective is to help both Ford and the City demonstrate and evaluate the performance characteristics of the E-450 H2ICE shuttle buses developed by Ford, which use a 6.8-liter supercharged Triton V-10 engine with a hydrogen storage system equivalent to 29 gallons of gasoline. The technology used during the demonstration project in the Ford buses is a modified internal combustion engine that allows the vehicles to run on 100% hydrogen fuel. Hydrogen gives a more thorough fuel burn which results in more power and responsiveness and less pollution. The resultant emissions from the tailpipe are 2010 Phase II compliant with NO after treatment. The City will lease two of these E-450 H2ICE buses from Ford for two years. The buses are outfitted with additional equipment used to gather information needed for the evaluation. Performance, reliability, safety, efficiency, and rider comments data will be collected. The method of data collection will be both electronically and manually. Emissions readings were not obtained during the project. The City planned to measure the vehicle exhaust with an emissions analyzer machine but discovered the bus emission levels were below the capability of their machine. Passenger comments were solicited on the survey cards. The majority of comments were favorable. The controllable issues encountered during this demonstration project were mainly due to the size of the hydrogen fuel tanks at the site and the amount of fuel that could be dispensed during a specified period of time. The uncontrollable issues encountered during this

  14. Camp Sacajawea Passive Solar Demonstration Project

    SciTech Connect

    Not Available

    1983-08-31

    The intent of the Passive Solar Demonstration Project was to have: an actual demonstration of the effectiveness of a passive solar design and working automatic shading devices; accurate data of energy saved by the passive design and shading devices; a brochure distributed to architects, builders, and consumers, with the monitoring data and information about the project; and the continued monitoring of the building to help explain to those who are using the building the value of the system; this would not only include the 7000 members, bu visitors and other users of the facility. To accomplish these goals, a monitoring system was installed in the recently build Passive Solar Lodge at Camp Sacajawea on Casper Mountain south of Casper, Wyoming. The building was monitored continously for the remainder of the project. The installation of the automatic shading device, a curtain wall was accomplished but had some difficulty. The results indicate there is some effectiveness of the Curtain Wall, but a quantitative value would be impossible at this time.

  15. Customer-focused planning: Demonstration project summaries

    SciTech Connect

    George, S.S. )

    1992-12-01

    To succeed in the increasingly competitive and dynamic markets in which they operate, electric utilities are focusing ever greater attention on understanding and meeting customer needs. EPRI's Customer Focused Planning (CFP) project was established to develop concepts and tools that will help utilities enhance their commitment to customer service. The project team conducted a series of interviews and meetings with participating utilities to collaboratively implement crucial steps in the CFP process. Although there is no unique set of tools or single management approach for improving product and service delivery, customer-focused companies have at least five ideals in common. They (1) define goals and objectives in concrete terms, (2) extend the planning boundaries of the organization to include all members of the energy services infrastructure, (3) painstakingly link functional activities directly to customer needs, (4) incorporate the customer's voice in new product/ service design, and (5) align performance measures with customer needs. In addition, customer-focused companies use a variety of methods to improve customer satisfaction and company performance. These methods include conducting market research, developing market processes such as demand-side management contracting or bidding to reveal customer preferences, and involving customers more directly in the planning process. This report summarizes two brief demonstration projects conducted as part of EPRI's CFP project, one at Commonwealth Edison Company (CECo) and one at PSI Energy. The CECo project emphasized developing customer-focused performance measures for telephone inquiries. The PSI Energy project involved a one-day workshop underscoring two important CFP elements-understanding customer wants and explicitly linking those wants to utility activities.

  16. Nucla circulating atmospheric fluidized bed demonstration project

    SciTech Connect

    Not Available

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  17. Habitat Demonstration Unit (HDU) Vertical Cylinder Habitat

    NASA Technical Reports Server (NTRS)

    Howe, Alan; Kennedy, Kriss J.; Gill, Tracy R.; Tri, Terry O.; Toups, Larry; Howard, Robert I.; Spexarth, Gary R.; Cavanaugh, Stephen; Langford, William M.; Dorsey, John T.

    2014-01-01

    NASA's Constellation Architecture Team defined an outpost scenario optimized for intensive mobility that uses small, highly mobile pressurized rovers supported by portable habitat modules that can be carried between locations of interest on the lunar surface. A compact vertical cylinder characterizes the habitat concept, where the large diameter maximizes usable flat floor area optimized for a gravity environment and allows for efficient internal layout. The module was sized to fit into payload fairings for the Constellation Ares V launch vehicle, and optimized for surface transport carried by the All-Terrain Hex-Limbed Extra-Terrestrial Explorer (ATHLETE) mobility system. Launch and other loads are carried through the barrel to a top and bottom truss that interfaces with a structural support unit (SSU). The SSU contains self-leveling feet and docking interfaces for Tri-ATHLETE grasping and heavy lift. A pressurized module needed to be created that was appropriate for the lunar environment, could be easily relocated to new locations, and could be docked together in multiples for expanding pressurized volume in a lunar outpost. It was determined that horizontally oriented pressure vessels did not optimize floor area, which takes advantage of the gravity vector for full use. Hybrid hard-inflatable habitats added an unproven degree of complexity that may eventually be worked out. Other versions of vertically oriented pressure vessels were either too big, bulky, or did not optimize floor area. The purpose of the HDU vertical habitat module is to provide pressurized units that can be docked together in a modular way for lunar outpost pressurized volume expansion, and allow for other vehicles, rovers, and modules to be attached to the outpost to allow for IVA (intra-vehicular activity) transfer between them. The module is a vertically oriented cylinder with a large radius to allow for maximal floor area and use of volume. The modular, 5- m-diameter HDU vertical habitat

  18. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1998-09-22

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (iv) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: � Consolidation of the project team-players; � Recruiting Koppers Industries as an additional stakeholder; � Developing a closed system for the production of binder pitch from tar in the Calderon coking process as the incentive for Koppers to join the team; � Gathering appropriate equipment for conducting a set of experiments at bench scale to simulate tar quality produced from the Calderon coking process for the production of binder pitch; and � Further progress made in the design of the commercial coking reactor.

  19. Wildlife habitat evaluation demonstration project. [Michigan

    NASA Technical Reports Server (NTRS)

    Burgoyne, G. E., Jr.; Visser, L. G.

    1981-01-01

    To support the deer range improvement project in Michigan, the capability of LANDSAT data in assessing deer habitat in terms of areas and mixes of species and age classes of vegetation is being examined to determine whether such data could substitute for traditional cover type information sources. A second goal of the demonstration project is to determine whether LANDSAT data can be used to supplement and improve the information normally used for making deer habitat management decisions, either by providing vegetative cover for private land or by providing information about the interspersion and juxtaposition of valuable vegetative cover types. The procedure to be used for evaluating in LANDSAT data of the Lake County test site is described.

  20. Results of a Formal Methods Demonstration Project

    NASA Technical Reports Server (NTRS)

    Kelly, J.; Covington, R.; Hamilton, D.

    1994-01-01

    This paper describes the results of a cooperative study conducted by a team of researchers in formal methods at three NASA Centers to demonstrate FM techniques and to tailor them to critical NASA software systems. This pilot project applied FM to an existing critical software subsystem, the Shuttle's Jet Select subsystem (Phase I of an ongoing study). The present study shows that FM can be used successfully to uncover hidden issues in a highly critical and mature Functional Subsystem Software Requirements (FSSR) specification which are very difficult to discover by traditional means.

  1. Landfill gas to electricity demonstration project

    NASA Astrophysics Data System (ADS)

    Giuliani, A. J.; Cagliostro, L. A.

    1982-03-01

    Medium Btu methane gas is a naturally occurring by product of anaerobic digestion of landfilled municipal solid waste. The energy potential of landfill gas in New York State is estimated to be 61 trillion Btu's per year or the equivalent of 10 percent of the natural gas used annually in the State. The 18-month Landfill Gas to Electricity Demonstration Project conducted at the Fresh Kills Landfill in Staten Island, New York conclusively demonstrated that landfill gas is an acceptable fuel for producing electricity using an internal combustion engine/generator set. Landfill gas proved to be a reliable and consistent fuel source during a six-month field test program. Engine exhaust emissions were determined to be comparable to that of natural gas and no unusually high corrosion rates on standard pipeline material were found.

  2. Characterizing toxic emissions from a coal-fired power plant demonstrating the AFGD ICCT Project and a plant utilizing a dry scrubber/baghouse system: Bailly Station Units 7 and 8 and AFGD ICCT Project. Final report. Final report

    SciTech Connect

    Dismukes, E.B.

    1994-10-20

    This report describes results of assessment of the risk of emissions of hazardous air pollutants at one of the electric power stations, Bailly Station, which is also the site of a Clean Coal Technology project demonstrating the Pure Air Advanced Flue Gas Desulfurization process (wet limestone). This station represents the configuration of no NO{sub x} reduction, particulate control with electrostatic precipitators, and SO{sub 2} control with a wet scrubber. The test was conducted September 3--6, 1993. Sixteen trace metals were determined along with 5 major metals. Other inorganic substances and organic compounds were also determined.

  3. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    2000-06-21

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (iv) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (v) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter continued to be focused on the following: Concluding the Negotiation and completing Contracts among Stakeholders of the Team; Revision of Final Report for Phase I; Engineering Design Progress; Selection of Systems Associates, Inc. for design of Control System; Conclusion of Secrecy Agreement with Carborundum (St. Gobain); and Permitting Work and Revisions.

  4. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    Albert Calderon

    2000-03-22

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (iv) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (v) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter continued to be focused on the following: Concluding the Negotiation and completing Contracts among Stakeholders of the Team; Revision of Final Report for Phase I; Engineering Design Progress; Selection of Systems Associates, Inc. for design of Control System; Conclusion of Secrecy Agreement with Carborundum (St. Gobain); and Permitting Work and Revisions.

  5. Illinois drainage water management demonstration project

    USGS Publications Warehouse

    Pitts, D.J.; Cooke, R.; Terrio, P.J.

    2004-01-01

    Due to naturally high water tables and flat topography, there are approximately 4 million ha (10 million ac) of farmland artificially drained with subsurface (tile) systems in Illinois. Subsurface drainage is practiced to insure trafficable field conditions for farm equipment and to reduce crop stress from excess water within the root zone. Although drainage is essential for economic crop production, there have been some significant environmental costs. Tile drainage systems tend to intercept nutrient (nitrate) rich soil-water and shunt it to surface water. Data from numerous monitoring studies have shown that a significant amount of the total nitrate load in Illinois is being delivered to surface water from tile drainage systems. In Illinois, these drainage systems are typically installed without control mechanisms and allow the soil to drain whenever the water table is above the elevation of the tile outlet. An assessment of water quality in the tile drained areas of Illinois showed that approximately 50 percent of the nitrate load was being delivered through the tile systems during the fallow period when there was no production need for drainage to occur. In 1998, a demonstration project to introduce drainage water management to producers in Illinois was initiated by NRCS4 An initial aspect of the project was to identify producers that were willing to manage their drainage system to create a raised water table during the fallow (November-March) period. Financial assistance from two federal programs was used to assist producers in retrofitting the existing drainage systems with control structures. Growers were also provided guidance on the management of the structures for both water quality and production benefits. Some of the retrofitted systems were monitored to determine the effect of the practice on water quality. This paper provides background on the water quality impacts of tile drainage in Illinois, the status of the demonstration project, preliminary

  6. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    SciTech Connect

    ALBERT CALDERON

    1998-06-22

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitating commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on three main activities: Continuation of design of the coking reactor; Raising funds from the private sector; and Detailed analysis of the tests conducted in Alliance, Ohio. The design of the reactor work centered on the provision for the capability to inspect and maintain the internals of the reactor. The activities relating to raising funds from the steel industry have been fruitful. Bethlehem Steel has agreed to contribute funds. The collected data from the tests at Alliance were analyzed and a detailed report was completed and presented to the International Iron & Steel Institute by invitation.

  7. Calderon cokemaking process/demonstration project

    SciTech Connect

    1995-10-01

    The Clean Air Act Amendments of 1990 set new emission standards for hazardous air pollutants from coke ovens. Congress, recognizing that the coke industry faces technological and financial difficulties in meeting these new, stringent emission standards, required the U.S. Environmental Protection Agency and DOE to conduct a joint six-year research and development program to assist the industry in developing and commercializing new technologies and work practices that would significantly reduce hazardous coke oven emissions. DOE`s purpose for sponsoring the proposed demonstration project is to provide the coke industry with a new option for the economical production of high quality coke that significantly reduces the quantity of pollutants entering the environment.

  8. LIFAC Sorbent Injection Desulfurization Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    Sorbent injection is a potentially important alternative to conventional wet lime and limestone scrubbing, and this project is another effort to test alternative sorbent injection approaches. In comparison to wet systems, LIFAC, with recirculation of the sorbent, removes less sulfur dioxide - 75--85% relative to 90% or greater for conventional scrubbers -- and requires more reagent material. However, if the demonstration is wet scrubbing systems: LIFAC is relatively easy to retrofit to an existing boiler and requires less area than conventional wet FGD systems. LIFAC is less expensive to install than conventional wet FGD processes. LIFAC's overall costs measured on a dollar-per-ton SO[sub 2] removed basis are less, an important advantage in a regulatory regime with trading of emission allocations. LIFAC produces a dry, readily disposable waste by-product versus a wet product. LIFAC is relatively simple to operate.

  9. LIFAC Sorbent Injection Desulfurization Demonstration Project

    SciTech Connect

    Not Available

    1991-01-01

    LIFAC combines upper-furnace limestone injection followed by post- furnace humidification in an activation reactor located between the air preheater and the ESP. The process produces a dry and stable waste product that is partially removed from the bottom of the activation reactor and partially removed at the ESP. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the US DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the fifth Technical Progress Report covering the period October 1, 1991 through the end of December 1991. Due to the power plant's planned outage schedule, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

  10. Controlled Hydrogen Fleet and Infrastructure Demonstration Project

    SciTech Connect

    Dr. Scott Staley

    2010-03-31

    This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while

  11. Wave Power Demonstration Project at Reedsport, Oregon

    SciTech Connect

    Mekhiche, Mike; Downie, Bruce

    2013-10-21

    Ocean wave power can be a significant source of large‐scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high‐voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon‐based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take‐off subsystem are complete; additionally the power take‐off subsystem has been successfully integrated into the spar.

  12. MODIL cryocooler producibility demonstration project results

    SciTech Connect

    Cruz, G.E.; Franks, R.M.

    1993-06-24

    The production of large quantities of spacecraft needed by SDIO will require a cultural change in design and production practices. Low rates production and the need for exceedingly high reliability has driven the industry to custom designed, hand crafted, and exhaustingly tested satellites. These factors have mitigated against employing design and manufacturing cost reduction methods commonly used in tactical missile production. Additional challenges to achieving production efficiencies are presented by the SDI spacecraft mission requirement. IR sensor systems, for example, are comprised of subassemblies and components that require the design, manufacture, and maintenance of ultra precision tolerances over challenging operational lifetimes. These IR sensors demand the use of reliable, closed loop, cryogenic refrigerators or active cryocoolers to meet stringent system acquisition and pointing requirements. The authors summarize some spacecraft cryocooler requirements and discuss their observations regarding Industry`s current production capabilities of cryocoolers. The results of the Lawrence Livermore National Laboratory (LLNL) Spacecraft Fabrication and Test (SF and T) MODIL`s Phase I producibility demonstration project are presented. The current project that involves LLNL and industrial participants is discussed.

  13. The fetal imaging workstation demonstration project.

    PubMed

    Lee, W

    1996-01-01

    Congenital birth defects are a leading cause of infant mortality. Early detection of fetal anomalies by prenatal ultrasound may improve clinical outcome in selected cases. However, many training programs are hindered by curriculum weaknesses which include: (1) limited physician exposure to ultrasound anomalies; (2) inadequate postnatal correlation with prenatal findings; (3) constraints imposed by static images for ultrasound training; and (4) difficulty with understanding complex three-dimensional anatomy. The Fetal Imaging Workstation Demonstration Project addresses these problems by illustrating how computers can supplement traditional prenatal ultrasound training through interactive multimedia. The project uses a laserdisc library of ultrasound video images as source material for a variety of interactive software tutorials. An educational testing module has been developed that can evaluate diagnostic skills through simulated ultrasound studies provided by the laserdisc library. An interactive three-dimensional fetal heart model also provides a new way for physicians to better understand their two-dimensional ultrasound studies. A survey suggests that this prototype has been widely accepted by housestaff physicians and that there is a perceived need for this supplementary training. Future work will address the educational effectiveness of these materials and will consider cost-effective ways to disseminate the software for other institutions. However, future development must be implemented against a background of rapidly emerging technologies involving faster computers, digital video, and virtual reality applications. PMID:9007213

  14. Exploration Medical System Demonstration (EMSD) Project

    NASA Technical Reports Server (NTRS)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  15. Integrated monitoring and surveillance system demonstration project

    SciTech Connect

    Aumeier, S.E.; Walters, G.; Kotter, D.; Walrath, W.M.; Zamecnik, R.J.

    1997-07-01

    We present a summary of efforts associated with the installation of an integrated system for the surveillance and monitoring of stabilized plutonium metals and oxides in long-term storage. The product of this effort will include a Pu storage requirements document, baseline integrated monitoring and surveillance system (IMSS) prototype and test bed that will be installed in the Fuel Manufacturing Facility (FMF) nuclear material vault at Argonne National Laboratory - West (ANL-W), and a Pu tracking database including data analysis capabilities. The prototype will be based on a minimal set of vault and package monitoring requirements as derived from applicable DOE documentation and guidelines, detailed in the requirements document, including DOE-STD-3013-96. The use of standardized requirements will aid individual sites in the selection of sensors that best suit their needs while the prototype IMSS, located at ANL-W, will be used as a test bed to compare and contrast sensor performance against a baseline integrated system (the IMSS), demonstrate system capabilities, evaluate potential technology gaps, and test new hardware and software designs using various storage configurations. With efforts currently underway to repackage and store a substantial quantity of plutonium and plutonium-bearing material within the DOE complex, this is an opportune time to undertake such a project. 4 refs.

  16. Town of Edinburg landfill reclamation demonstration project

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  17. LIFAC Sorbent Injection Desulfurization Demonstration Project

    SciTech Connect

    Not Available

    1992-01-01

    The LIFAC technology has similarities to other sorbent injection technologies using humidification, but employs a unique patented vertical reaction chamber located down-stream of the boiler to facilitate and control the sulfur capture and other chemical reactions. This chamber improves the overall reaction efficiency enough to allow the use of pulverized limestone rather than more expensive reagents such as lime which are often used to increase the efficiency of other sorbent injection processes. Sorbent injection is a potentially important alternative to conventional wet lime and limestone scrubbing, and this project is another effort to test alternative sorbent injection approaches. In comparison to wet systems, LIFAC, with recirculation of the sorbent, removes less sulfur dioxide - 75--85% relative to 90% or greater for conventional scrubbers - and requires more reagent material. However, if the demonstration is successful, LIFAC will offer these important advantages over wet scrubbing systems: LIFAC is relatively easy to retrofit to an existing boiler and requires less area than conventional wet FGD systems; LIFAC is less expensive to install than conventional wet FGD processes; LIFAC's overall costs measured on a dollar-per-ton S0{sub 2} removed basis are less, an important advantage in a regulatory regime with trading of emission allocations. LIFAC produces a dry, readily disposable waste by-product versus a wet product; and LIFAC is relatively simple to operate.

  18. WSF Biodiesel Demonstration Project Final Report

    SciTech Connect

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

  19. Expedited Technology Demonstration Project Baseline Revision 3.0

    SciTech Connect

    Adamson, M.G.; Densley, P.J.

    1996-10-01

    The Expedited Technology Demonstration Project Plan, MWNT Revised Baseline 3.0, replaces and significantly modifies the current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is shown. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in FY97, followed by the activation of final forms in FY98.

  20. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  1. Locomotive Emission and Engine Idle Reduction Technology Demonstration Project

    SciTech Connect

    John R. Archer

    2005-03-14

    In response to a United States Department of Energy (DOE) solicitation, the Maryland Energy Administration (MEA), in partnership with CSX Transportation, Inc. (CSXT), submitted a proposal to DOE to support the demonstration of Auxiliary Power Unit (APU) technology on fifty-six CSXT locomotives. The project purpose was to demonstrate the idle fuel savings, the Nitrous Oxide (NOX) emissions reduction and the noise reduction capabilities of the APU. Fifty-six CSXT Baltimore Division locomotives were equipped with APUs, Engine Run Managers (ERM) and communications equipment to permit GPS tracking and data collection from the locomotives. Throughout the report there is mention of the percent time spent in the State of Maryland. The fifty-six locomotives spent most of their time inside the borders of Maryland and some spent all their time inside the state borders. Usually when a locomotive traveled beyond the Maryland State border it was into an adjoining state. They were divided into four groups according to assignment: (1) Power Unit/Switcher Mate units, (2) Remote Control units, (3) SD50 Pusher units and (4) Other units. The primary data of interest were idle data plus the status of the locomotive--stationary or moving. Also collected were main engine off, idling or working. Idle data were collected by county location, by locomotive status (stationary or moving) and type of idle (Idle 1, main engine idling, APU off; Idle 2, main engine off, APU on; Idle 3, main engine off, APU off; Idle 4, main engine idle, APU on). Desirable main engine idle states are main engine off and APU off or main engine off and APU on. Measuring the time the main engine spends in these desirable states versus the total time it could spend in an engine idling state allows the calculation of Percent Idle Management Effectiveness (%IME). IME is the result of the operation of the APU plus the implementation of CSXT's Warm Weather Shutdown Policy. It is difficult to separate the two. The units

  2. UNIVERSITY OF KANSAS SMART GRID DEMONSTRATION PROJECT

    EPA Science Inventory

    The University of Kansas (KU) EcoHawks Design Project began in 2008 with the conversion of a discarded 1974 Volkswagen Super Beetle into a fuel neutral series hybrid running on 100% biodiesel created from waste vegetable oil. This project continued in year two through upgradi...

  3. A Modular Instrumentation System for NASA's Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Rojdev, Kristina; Kennedy, Kriss; Yim, Hester; Wagner, Raymond S.; Hong, Todd; Studor, George; Delaune, Paul

    2010-01-01

    NASA's human spaceflight program is focused on developing technologies to expand the reaches of human exploration and science activities beyond low earth orbit. A critical aspect of living in space or on planetary surfaces is habitation, which provides a safe and comfortable space in which humans can live and work. NASA is seeking out the best option for habitation by exploring several different concepts through the Habitat Demonstration Unit (HDU) project. The purpose of this HDU is to develop a fully autonomous habitation system that enables human exploration of space. One critical feature of the HDU project that helps to accomplish its mission of autonomy is the instrumentation system that monitors key subsystems operating within a Habitat configuration. The following paper will discuss previous instrumentation systems used in analog habitat concepts and how the current instrumentation system being implemented on the HDU1-PEM, or pressurized excursion module, is building upon the lessons learned of those previous systems. Additionally, this paper will discuss the benefits and the limitations of implementing a wireless sensor network (WSN) as the basis for data transport in the instrumentation system. Finally, this paper will address the experiences and lessons learned with integration, testing prior to deployment, and field testing at the JSC rock yard. NASA is developing the HDU1-PEM as a step towards a fully autonomous habitation system that enables human exploration of space. To accomplish this purpose, the HDU project is focusing on development, integration, testing, and evaluation of habitation systems. The HDU will be used as a technology pull, testbed, and integration environment in which to advance NASA's understanding of alternative mission architectures, requirements, and operations concepts definition and validation. This project is a multi-year effort. In 2010, the HDU1-PEM will be in a pressurized excursion module configuration, and in 2011 the

  4. Texas LPG fuel cell development and demonstration project

    SciTech Connect

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units. For further

  5. Big Island Demonstration Project - Black Liquor

    SciTech Connect

    2006-08-01

    Black liquor is a papermaking byproduct that also serves as a fuel for pulp and paper mills. This project involves the design, construction, and operation of a black liquor gasifier that will be integrated into Georgia-Pacific's Big Island facility in Virginia, a mill that has been in operation for more than 100 years.

  6. 76 FR 80907 - TRICARE Prime Urgent Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... of the Secretary TRICARE Prime Urgent Care Demonstration Project AGENCY: Department of Defense..., entitled Department Of Defense TRICARE Prime Urgent Care Demonstration Project. The demonstration project is intended to test whether allowing four visits to an urgent care center without requiring...

  7. 76 FR 12080 - TRICARE Access to Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... of the Secretary TRICARE Access to Care Demonstration Project AGENCY: Department of Defense. ACTION..., entitled Department of Defense TRICARE Access to Care Demonstration Project. The demonstration project is intended to improve access to urgent care including minor illness or injury for Coast Guard...

  8. Utility Scale Wind turbine Demonstration Project

    SciTech Connect

    Terry Fredericks

    2006-03-31

    The purpose of the Three Affiliated Tribes proposing to Department of Energy was nothing new to Denmark. National Meteorological Studies have proved that North Dakota has some of the most consistence wind resources in the world. The Three Affiliated Tribes wanted to assess their potential and become knowledgeable to developing this new and upcoming resource now valuable. By the Tribe implementing the Utility-scale Wind Turbine Project on Fort Berthold, the tribe has proven the ability to complete a project, and has already proceeded in a feasibility studies to developing a large-scale wind farm on the reservation due to tribal knowledge learned, public awareness, and growing support of a Nation wanting clean renewable energy. The tribe is working through the various measures and regulations with the want to be self-sufficient, independent, and marketable with 17,000 times the wind energy needed to service Fort Berthold alone.

  9. An Overhead Projection Demonstration of Optical Activity

    ERIC Educational Resources Information Center

    Hill, John W.

    1973-01-01

    Describes the use of two polarizing lenses, a yellow filter, an oatmeal bos, a piece of cardboard, a 1,000 ml beaker, and an overhead projector to demonstrate compound optical activity to large classes. Indicates the presence of an accuracy within 1-2 degrees of usually acceptable data. (CC)

  10. Advanced secondary recovery demonstration for the Sooner Unit. Annual report, October 1992--May 1993

    SciTech Connect

    Sippel, M.; Junkin, J.; Pritchett, R.

    1995-07-01

    The objectives of this project are to demonstrate the effectiveness of a multi-diciplinary approach to targeted infill drilling and improved reservoir management. The first phase involves geophysical, geological, and engineering data acquisition and analysis to identify optimum well sites and to develop a reservoir operations plan. This report summarizes activities concerned with phase I of the Sooner Unit Project.

  11. United States National Hydrogen Fuel Cell Vehicle and Infrastructure Learning Demonstration - Status and Results (Presentation)

    SciTech Connect

    Wipke,K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Garbak, J.

    2009-03-06

    This presentation provides status and results for the United States National Hydrogen Fuel Cell Vehicle Learning Demonstration, including project objectives, partners, the National Renewable Energy Laboratory's role in the project and methodology, how to access complete results, and results of vehicle and infrastructure analysis.

  12. DOE`s annealing prototype demonstration projects

    SciTech Connect

    Warren, J.; Nakos, J.; Rochau, G.

    1997-02-01

    One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable through a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy`s Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana`s Marble Hill nuclear power plant. The MPR team`s annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company`s nuclear power plant at Midland, Michigan. This paper describes the Department`s annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges.

  13. Cryogenic Barrier Demonstration Project. Final report

    SciTech Connect

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  14. Nucla circulating atmospheric fluidized bed demonstration project. Final report

    SciTech Connect

    Not Available

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute`s decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  15. Milliken Clean Coal Technology Demonstration Project. Project performance summary, Clean Coal Technology Demonstration Program

    SciTech Connect

    None, None

    2002-11-30

    The New York State Electric & Gas Corporation (NYSEG) demonstrated a combination of technologies at its Milliken Station in Lansing, New York, designed to: (1) achieve high sulfur dioxide (SO2) capture efficiency, (2) bring nitrogen oxide (NOx) emissions into compliance with Clean Air Act Amendments of 1990 (CAAA), (3) maintain high station efficiency, and (4) eliminate waste water discharge. This project is part of the U.S. Department of Energy’s (DOE) Clean Coal Technology Demonstration Program (CCTDP) established to address energy and environmental concerns related to coal use. DOE sought cost-shared partnerships with industry through five nationally competed solicitations to accelerate commercialization of the most promising advance coal-based power generation and pollution control technologies. The CCTDP, valued at over five billion dollars, has significantly leveraged federal funding by forging effective partnerships founded on sound principles. For every federal dollar invested, CCTDP participants have invested two dollars. These participants include utilities, technology developers, state governments, and research organizations. The project presented here was one of nine selected in January 1991 from 33 proposals submitted in response to the program’s fourth solicitation.

  16. Solar energy parking canopy demonstration project

    SciTech Connect

    Cylwik, Joe; David, Lawrence

    2015-09-24

    The goal of this pilot/demonstration program is to measure the viability of using solar photovoltaic (PV) technology at three locations in a mountain community environment given the harsh weather conditions. An additional goal is to reduce long-term operational costs, minimize green house gas emissions, lower the dependency on energy produced from fossil fuels, and improve the working environment and health of city employees and residents.

  17. Calderon Cokemaking Process/Demonstration Project

    SciTech Connect

    1998-04-08

    During this reporting period an agreement was entered into with Bechtel Corporation for design and construction of Calderon cokemaking facilities (see enclosed letter of February 28, 1997). A second agreement with Bechtel Enterprises to commercialize the Calderon technology as a worldwide business has progressed; during the forthcoming quarter, it is expected to have in place an agreement with Bechtel Enterprises (see attached letter of February 20, 1997). Thyssen Still Otto Anlagentechnik (TSOA), the world's largest builder of conventional cokemaking facilities indicated that it would be please to join Bechtel and Calderon in the demonstration and implementation of Calderon's cokemaking technology (see attached letter of January, 1997).

  18. Poland petroleum refinery sludge lagoon demonstration project

    SciTech Connect

    Altman, D.J.

    2000-05-05

    The US Department of Energy and the Institute for Ecology of Industrial Area have been working together to develop mutually beneficial, cost-effective environmental remediation technologies such as the demonstration of bioremediation techniques for the clean up of acidic petroleum sludge impacted soils at an oil refinery in southern Poland. After an expedited site characterization, treatability study, and a risk assessment study, a remediation strategy was devised. The waste material was composed primarily of high molecular weight paraffinic and polynuclear aromatic hydrocarbons. A biopile design which employed a combination of passive and active aeration in conjunction with nutrient and surfactant application as used to increase the biodegradation of the contaminants of concern.

  19. FINDING SOLUTIONS AT THE WEST VALLEY DEMONSTRATION PROJECT

    SciTech Connect

    Drake, John L.; Gramling, James M.; Houston, Helene M.

    2003-02-27

    The United States Department of Energy Office of Environmental Management (DOE-EM) faces a number of sizeable challenges as it begins to transform its mission from managing risk to reducing and eliminating risk throughout the DOE Complex. One of the greatest challenges being addressed by DOE-EM as this transformation takes place is accelerating the deactivation and decommissioning of thousands of facilities within the DOE Complex that were once used to support nuclear-related programs and projects. These facilities are now unused and aging. Finding solutions to complete the cleanup of these aging facilities more safely, efficiently, and effectively while reducing costs is critical to successfully meeting DOE-EM's cleanup challenge. The Large-Scale Demonstration and Deployment Project (LSDDP) of Hot Cells at the West Valley Demonstration Project (WVDP) is a near-term project funded through the DOE's National Energy Technology Laboratory (DOE-NETL) for the specific purpose of identifying, evaluating, demonstrating, and deploying commercially available technologies that are capable of streamlining the cleanup of hot cells in unused facilities while improving worker safety. Two DOE project sites are participating in this LSDDP: the WVDP site in West Valley, New York and the Hanford River Corridor Project (RCP) site in Richland, Washington. The WVDP site serves as the host site for the project. Technologies considered for demonstration and potential deployment at both LSDDP sites are targeted for application in hot cells that require the use of remote and semi-remote techniques to conduct various cleanup-related activities because of high radiation or high contamination levels. These hot cells, the type of cleanup activities being conducted, and technologies selected for demonstration are the main topics discussed in this paper. The range of cleanup-related activities addressed include in-situ characterization, size-reduction, contamination control, decontamination, in

  20. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    SciTech Connect

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15 states.

  1. Recovery Act. Solid Oxide Fuel Cell Diesel Auxilliary Power Unit Demonstration

    SciTech Connect

    Geiger, Gail E.

    2013-09-30

    Solid Oxide Fuel Cell Diesel Auxilliary Power Unit Demonstration Project. Summarizing development of Delphi’s next generation SOFC system as the core power plant to prove the viability of the market opportunity for a 3-5 kW diesel SOFC system. Report includes test and demonstration results from testing the diesel APU in a high visibility fleet customer vehicle application.

  2. The ENCOAL Mild Gasification Demonstration Project

    SciTech Connect

    Not Available

    1990-07-01

    The DOE plans to enter into a Cooperative Agreement with ENCOAL Corporation, a wholly owned subsidiary of Shell Mining Company, for the cost-shared design, construction and operation of a mild gasification facility based on Liquids-from-Coal (LFC) technology. The facility is planned to be located at the Triton Coal Company's Buckskin Mine near Gillette, Wyoming. The mild gasification process to be demonstrated will produce two new, low-sulfur fuel forms (a solid and a liquid) from subbituminous coal. The new fuel forms would be suitable for combustion in commercial, industrial, and utility boilers. This environmental assessment has been prepared by the DOE to comply with the requirements of the NEPA. Pollutant emissions, land use, water, and waste management are briefly discussed. 3 figs., 5 tabs.

  3. 76 FR 60007 - TRICARE Demonstration Project for the Philippines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... of the Secretary TRICARE Demonstration Project for the Philippines AGENCY: Department of Defense... TRICARE demonstration project for the Philippines. SUMMARY: This notice is to advise interested parties of... Philippines.'' The purpose of this demonstration is to validate an alternative approach to...

  4. High Input Voltage, Silicon Carbide Power Processing Unit Performance Demonstration

    NASA Technical Reports Server (NTRS)

    Bozak, Karin E.; Pinero, Luis R.; Scheidegger, Robert J.; Aulisio, Michael V.; Gonzalez, Marcelo C.; Birchenough, Arthur G.

    2015-01-01

    A silicon carbide brassboard power processing unit has been developed by the NASA Glenn Research Center in Cleveland, Ohio. The power processing unit operates from two sources: a nominal 300 Volt high voltage input bus and a nominal 28 Volt low voltage input bus. The design of the power processing unit includes four low voltage, low power auxiliary supplies, and two parallel 7.5 kilowatt (kW) discharge power supplies that are capable of providing up to 15 kilowatts of total power at 300 to 500 Volts (V) to the thruster. Additionally, the unit contains a housekeeping supply, high voltage input filter, low voltage input filter, and master control board, such that the complete brassboard unit is capable of operating a 12.5 kilowatt Hall effect thruster. The performance of the unit was characterized under both ambient and thermal vacuum test conditions, and the results demonstrate exceptional performance with full power efficiencies exceeding 97%. The unit was also tested with a 12.5kW Hall effect thruster to verify compatibility and output filter specifications. With space-qualified silicon carbide or similar high voltage, high efficiency power devices, this would provide a design solution to address the need for high power electric propulsion systems.

  5. 75 FR 71171 - Social Security Disability Program Demonstration Project: Benefit Offset National Demonstration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... From the Federal Register Online via the Government Publishing Office ] SOCIAL SECURITY ADMINISTRATION Social Security Disability Program Demonstration Project: Benefit Offset National Demonstration (BOND) AGENCY: Social Security Administration. ACTION: Notice. SUMMARY: We are announcing the...

  6. Demonstration of Autonomous Rendezvous Technology (DART) Project Summary

    NASA Technical Reports Server (NTRS)

    Rumford, TImothy E.

    2003-01-01

    Since the 1960's, NASA has performed numerous rendezvous and docking missions. The common element of all US rendezvous and docking is that the spacecraft has always been piloted by astronauts. Only the Russian Space Program has developed and demonstrated an autonomous capability. The Demonstration of Autonomous Rendezvous Technology (DART) project currently funded under NASA's Space Launch Initiative (SLI) Cycle I, provides a key step in establishing an autonomous rendezvous capability for the United States. DART's objective is to demonstrate, in space, the hardware and software necessary for autonomous rendezvous. Orbital Sciences Corporation intends to integrate an Advanced Video Guidance Sensor and Autonomous Rendezvous and Proximity Operations algorithms into a Pegasus upper stage in order to demonstrate the capability to autonomously rendezvous with a target currently in orbit. The DART mission will occur in April 2004. The launch site will be Vandenburg AFB and the launch vehicle will be a Pegasus XL equipped with a Hydrazine Auxiliary Propulsion System 4th stage. All mission objectives will be completed within a 24 hour period. The paper provides a summary of mission objectives, mission overview and a discussion on the design features of the chase and target vehicles.

  7. Copper Cable Recycling System - The INEEL LSDDP Demonstration Project

    SciTech Connect

    Conner, Craig C; Meservey, Richard Harlan; Rosenberger, S.

    2001-02-01

    The United States Department of Energy (DOE) continually seeks safer and more cost-effective technologies for the deactivation and decommissioning (D&D) of nuclear facilities. The Deactivation and Decommissioning Focus Area (DDFA) and the DOE’s office of Science and Technology (OST) sponsors Large Scale Demonstration and Deployment Projects (LSDDPs). The increasing number of deactivation and decommissioning (D&D) activities at nuclear facilities can generate hundreds of tons of cables per facility consuming valuable resources such as disposal space and copper. Driven by increasing environmental concerns as well as economical pressures there is a developing need for the recycling of the uncontaminated copper. As part of the LSDDP program the NUKEM Copper Cable Recycling System (CCRS) was demonstrated November 1999 at the Idaho National Engineering and Environmental Laboratory (INEEL). This process allows recovering and recycling the uncontaminated copper contained in surface contaminated cables. The NUKEM CCRS was originally developed in Germany for the use during the D&D of commercial power plants. Up to date the CCRS has successfully processed in Germany more than 200 metric tons of contaminated cables resulting in virtually 100% free release of copper under the German standards. A total of 13.5 tons non and surrogate contaminated cables in a wide variety of sizes were successfully processed during the technology demonstration at INEEL. The assessment has demonstrated the mobility and flexibility of this new process.

  8. Planning and Evaluating Telecommunications Demonstration Projects and Assessing the Costs of Telecommunications Demonstration Projects. Final Report #146-03.

    ERIC Educational Resources Information Center

    Clippinger, John H.; Fain, Sanford B.

    This two-report volume was prepared to describe approaches for evaluating individual Office of Telecommunications Policy (OTP) demonstration projects in the future and to aid demonstration project directors in project planning and development. The first report focuses on the role of planning and evaluation activities, stressing their importance in…

  9. 20 CFR 638.700 - Experimental, research, and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., at his or her discretion, may undertake experimental, research, or demonstration projects for the... undertaken jointly with other Federal or federally assisted programs. (c) The Secretary may waive...

  10. High Input Voltage, Silicon Carbide Power Processing Unit Performance Demonstration

    NASA Technical Reports Server (NTRS)

    Bozak, Karin E.; Pinero, Luis R.; Scheidegger, Robert J.; Aulisio, Michael V.; Gonzalez, Marcelo C.; Birchenough, Arthur G.

    2015-01-01

    A silicon carbide brassboard power processing unit has been developed by the NASA Glenn Research Center in Cleveland, Ohio. The power processing unit operates from two sources - a nominal 300-Volt high voltage input bus and a nominal 28-Volt low voltage input bus. The design of the power processing unit includes four low voltage, low power supplies that provide power to the thruster auxiliary supplies, and two parallel 7.5 kilowatt power supplies that are capable of providing up to 15 kilowatts of total power at 300-Volts to 500-Volts to the thruster discharge supply. Additionally, the unit contains a housekeeping supply, high voltage input filter, low voltage input filter, and master control board, such that the complete brassboard unit is capable of operating a 12.5 kilowatt Hall Effect Thruster. The performance of unit was characterized under both ambient and thermal vacuum test conditions, and the results demonstrate the exceptional performance with full power efficiencies exceeding 97. With a space-qualified silicon carbide or similar high voltage, high efficiency power device, this design could evolve into a flight design for future missions that require high power electric propulsion systems.

  11. Multiview Projection Using CADKEY Freeze-Frame Demonstrations.

    ERIC Educational Resources Information Center

    Kelso, Robert P.; Ziai, M. Reza

    1988-01-01

    Describes a three-dimensional computer aided design software package, CADKEY, for demonstrating orthographic orthodirectional projection theory to a classroom. Provides several figures for showing the demonstrations. (Author/YP)

  12. Community Based Demonstration Projects: Willamette Ecosystem Services Project (WESP)

    EPA Science Inventory

    EPA’s Ecosystem Services Research Program in the Office of Research and Development is focused on the study of ecosystem services and the benefits to human well-being provided by ecological systems. As part of this research effort, the Willamette Ecosystems Services Project (WE...

  13. Student Assistance Program Demonstration Project Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Pollard, John A.; Houle, Denise M.

    This document presents the final report on the evaluation of California's model student assistance program (SAP) demonstration projects implemented in five locations across the state from July 1989 through June 1992. The report provides an overall, integrated review of the evaluation of the SAP demonstration projects, summarizes important findings…

  14. AREAWIDE SUPPRESSION OF FIRE ANTS: DEMONSTRATION PROJECT IN MISSISSIPPI, 2006

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The USDA-ARS demonstration project for the suppression of imported fire ants has entered its sixth year. In 2005, Mississippi State University joined the project monitoring sites in Clay and Grenada Counties. The Areawide project integrates biological control agents with the chemical ...

  15. Environmental Control Unit Harness Project

    NASA Technical Reports Server (NTRS)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  16. RESOLVE Projects: Lunar Water Resource Demonstration and Regolith Volatile Characterization

    NASA Technical Reports Server (NTRS)

    2008-01-01

    To sustain affordable human and robotic space exploration, the ability to live off the land at the exploration site will be essential. NASA calls this ability in situ resource utilization (ISRU) and is focusing on finding ways to sustain missions first on the Moon and then on Mars. The ISRU project aims to develop capabilities to technology readiness level 6 for the Robotic Lunar Exploration Program and early human missions returning to the Moon. NASA is concentrating on three primary areas of ISRU: (1) excavating, handling, and moving lunar regolith, (2) extracting oxygen from lunar regolith, and (3) finding, characterizing, extracting, separating, and storing volatile lunar resources, especially in the permanently shadowed polar craters. To meet the challenges related to technology development for these three primary focus areas, the Regolith and Environment Science and Oxygen and Lunar Volatile Extraction (RESOLVE) project was initiated in February 2005, through funding by the Exploration Systems Mission Directorate. RESOLVE's objectives are to develop requirements and conceptual designs and to perform breadboard concept verification testing of each experiment module. The final goal is to deliver a flight prototype unit that has been tested in a relevant lunar polar environment. Here we report progress toward the third primary area creating ways to find, characterize, extract, separate, and store volatile lunar resources. The tasks include studying thermal, chemical, and electrical ways to collect such volatile resources as hydrogen, water, nitrogen, methane, and ammonia. We approached this effort through two subtasks: lunar water resource demonstration (LWRD) and regolith volatile characterization (RVC).

  17. SNOX demonstration project: Volume 2, Project performance and economics. Final report

    SciTech Connect

    1996-07-01

    The SNOX process, developed by Haldor Topsoe A/S and demonstrated and marketed in North America by ABB Environmental Systems (ABBES), is an innovative process which removes both sulfur dioxide and nitrogen oxides from power plant flue gases. Sulfur dioxide is recovered as high purity, concentrated sulfuric acid and nitrogen oxides are converted to nitrogen gas and water vapor; no additional waste streams are produced. As part of the Clean Coal Technology Program, this project was demonstrated under joint sponsorship from the US Department of Energy, Ohio Coal Development Office, ABBES, Snamprogetti, and Ohio Edison. The project objective was to demonstrate the SO{sub 2}/NO{sub x} reduction efficiencies of the SNOX process on an electric power plant firing high-sulfur Ohio Coal. A 35-MWe demonstration has been conducted on a 108-MWe unit, Ohio Edison`s Niles Plant Unit 2, in Trumbull County, Ohio. The $31.4 million project began site preparation in November 1990 and commenced treating flue gas in March of 1992. A parametric test program has been completed. This report presents a description of the technology, results from the 33 month testing and operation phase, and information from a commercial scale economic evaluation. During the demonstration, the process met or exceeded its design goals of 95% SO{sub 2} removal, 90% NO{sub x} removal, and production of commercial grade (>93.2 wt.%) sulfuric acid. The plant was operated for approximately 8000 hours and produced more than 5600 tons of acid, which was purchased and distributed by a local supplier to end users. Projected economics for a 500 MWe commercial SNOX plant indicate a total capital requirement of 305 $/kW, levelized incremental cost of power at 6.1 mills/kWh, 219 $/ton of SO{sub 2} removed, and 198 $/ton of SO{sub 2}+NO{sub x} removed (all at constant dollars).

  18. Recycling and composting demonstration projects for the Memphis region

    SciTech Connect

    Muller, D. )

    1992-05-01

    This report documents the development and implementation of the project entitled Recycling and Composting Demonstration Projects for the Memphis Region.'' The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  19. Recycling and composting demonstration projects for the Memphis region

    SciTech Connect

    Muller, D.

    1992-05-01

    This report documents the development and implementation of the project entitled ``Recycling and Composting Demonstration Projects for the Memphis Region.`` The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  20. Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan

    SciTech Connect

    1996-07-01

    The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98.

  1. Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project

    SciTech Connect

    2013-12-31

    This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.

  2. Vitrification facility at the West Valley Demonstration Project

    SciTech Connect

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project`s vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project`s background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing.

  3. Tampa Bay Ecosystem Services Demonstration Project Website: Phase II

    EPA Science Inventory

    The Tampa Bay Ecosystem Services Demonstration Project models the impact of human development and natural stressors on the economic, aesthetic and cultural value of local ecosystems. By linking ecological structures, functions, and condition to the ecosystem services valued by h...

  4. The ethanol heavy-duty truck fleet demonstration project

    SciTech Connect

    1997-06-01

    This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

  5. Radiation safety at the West Valley Demonstration Project

    SciTech Connect

    Hoffman, R.L.

    1997-05-06

    This is a report on the Radiation Safety Program at the West Valley Demonstration Project (WVDP). This Program covers a number of activities that support high-level waste solidification, stabilization of facilities, and decontamination and decommissioning activities at the Project. The conduct of the Program provides confidence that all occupational radiation exposures received during operational tasks at the Project are within limits, standards, and program requirements, and are as low as reasonably achievable.

  6. The Atlanta Public School's Dropout Initiative: A Demonstration Project.

    ERIC Educational Resources Information Center

    Jonas, Edward D., Jr.; Amuleru-Marshall, Nancy

    This project proposes the development and implementation of a model system for collecting, documenting, and reporting to the Atlanta (Georgia) Board of Education information that will indicate the number, ages, and grades of students dropping out of the Atlanta Public School System (APS). Furthermore, this project will demonstrate an effective…

  7. Milliken Clean Coal Demonstration Project: A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-15

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal-utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage.

  8. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  9. MINE WASTE TECHNOLOGY PROGRAM - UNDERGROUND MINE SOURCE CONTROL DEMONSTRATION PROJECT

    EPA Science Inventory

    This report presents results of the Mine Waste Technology Program Activity III, Project 8, Underground Mine Source Control Demonstration Project implemented and funded by the U. S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U. S. Department of E...

  10. Rural Workplace Literacy Demonstration Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    In April 1991, Enterprise State Junior College and MacArthur State Technical College established a rural workplace literacy demonstration project in partnership with adult basic education, seven employers, and a labor organization. The project served 615 persons in classes offered at the 2 colleges, 4 partner locations, and 3 additional worksites.…

  11. Green River Formation water flood demonstration project. Final report

    SciTech Connect

    Pennington, B.I.; Dyer, J.E.; Lomax, J.D. |; Deo, M.D.

    1996-11-01

    The objectives of the project were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter core, Formation Micro Imaging (FMI) logs from several wells and Magnetic Resonance Imaging (MRI) logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using high-temperature gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2,000 barrels per day.

  12. ESO Demonstration Project with the NRAO 12-m Antenna

    NASA Astrophysics Data System (ADS)

    Heald, R.; Karban, R.

    2000-03-01

    During the months of September through November 1999, an ALMA joint demonstration project between the European Southern Observatory (ESO) and the National Radio Astronomy Observatory (NRAO) was carried out in Socorro/New Mexico. During this period, Robert Karban (ESO) and Ron Heald (NRAO) worked together on the ESO Demonstration Project. The project integrated ESO software and existing NRAO software (a prototype for the future ALMA control software) to control the motion of the Kitt Peak 12-m antenna. ESO software from the VLT provided the operator interface and coordinate transformation software, while Pat Wallace's TPOINT provided the pointing- model software.

  13. A Demonstration Project: "The Good Life" for Infants and Toddlers.

    ERIC Educational Resources Information Center

    Keister, Mary Elizabeth

    In response to requests for information on a city day-care program, a demonstration project for infants and toddlers, the Demonstration Nursery Center at the University of North Carolina, is reported. Physical makeup of the facilities is described, along with daily procedures and staff activities. To study the effects of day care on babies, a…

  14. Dan Poskevich demonstrates experiment for STS student involvement project

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Dan Poskevich, a college student, demonstrates an experiment he developed for the Space Transportation System (STS) student involvement project. In the aluminum box are thousands of honeybees constructing a honeycomb. Poskevich gave a brief demonstration for news media representatives in the Space Shuttle one-G trainer in JSC's mockup and integration lab.

  15. NASA Habitat Demonstration Unit (HDU) Deep Space Habitat Analog

    NASA Technical Reports Server (NTRS)

    Howe, A. Scott; Kennedy, Kriss J.; Gill, Tracy

    2013-01-01

    The NASA Habitat Demonstration Unit (HDU) vertical cylinder habitat was established as a exploration habitat testbed platform for integration and testing of a variety of technologies and subsystems that will be required in a human-occupied planetary surface outpost or Deep Space Habitat (DSH). The HDU functioned as a medium-fidelity habitat prototype from 2010-2012 and allowed teams from all over NASA to collaborate on field analog missions, mission operations tests, and system integration tests to help shake out equipment and provide feedback for technology development cycles and crew training. This paper documents the final 2012 configuration of the HDU, and discusses some of the testing that took place. Though much of the higher-fidelity functionality has 'graduated' into other NASA programs, as of this writing the HDU, renamed Human Exploration Research Analog (HERA), will continue to be available as a volumetric and operational mockup for NASA Human Research Program (HRP) research from 2013 onward.

  16. Development Status of the Fission Power System Technology Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M.; Pearson, Jon Boise; Godfoy, Thomas

    2012-01-01

    This paper summarizes the progress that has been made in the development of the Fission Power System Technology Demonstration Unit (TDU). The reactor simulator core and Annular Linear Induction Pump have been fabricated and assembled into a test loop at the NASA Marshall Space Flight Center. A 12 kWe Power Conversion Unit (PCU) is being developed consisting of two 6 kWe free-piston Stirling engines. The two 6 kWe engines have been fabricated by Sunpower Inc. and are currently being tested separately prior to integration into the PCU. The Facility Cooling System (FCS) used to reject convertor waste heat has been assembled and tested at the NASA Glenn Research Center (GRC). The structural elements, including a Buildup Assembly Platform (BAP) and Upper Truss Structure (UTS) have been fabricated, and will be used to test cold-end components in thermal vacuum prior to TDU testing. Once all components have been fully tested at the subsystem level, they will be assembled into an end-to-end system and tested in thermal vacuum at GRC.

  17. Development Status of the Fission Power System Technology Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M; Pearson, Jon Boise; Godfroy, Thomas

    2012-01-01

    This paper summarizes the progress that has been made in the development of the Fission Power System Technology Demonstration Unit (TDU). The reactor simulator core and Annular Linear Induction Pump have been fabricated and assembled into a test loop at the NASA Marshall Space Flight Center. A 12 kWe Power Conversion Unit (PCU) is being developed consisting of two 6 kWe free-piston Stirling engines. The two 6 kWe engines have been fabricated by Sunpower Inc. and are currently being tested separately prior to integration into the PCU. The Facility Cooling System (FCS) used to reject convertor waste heat has been assembled and tested at the NASA Glenn Research Center (GRC). The structural elements, including a Buildup Assembly Platform (BAP) and Upper Truss Structure (UTS) have been fabricated, and will be used to test cold-end components in thermal vacuum prior to TDU testing. Once all components have been fully tested at the subsystem level, they will be assembled into an end-to-end system and tested in thermal vacuum at NASA GRC.

  18. Green Propulsion Auxiliary Power Unit Demonstration at MSFC

    NASA Technical Reports Server (NTRS)

    Robinson, Joel W.

    2014-01-01

    In 2012, the National Aeronautics & Space Administration (NASA) Space Technology Mission Directorate (STMD) began the process of building an integrated technology roadmap, including both technology pull and technology push strategies. Technology Area 1 (TA-01)1 for Launch Propulsion Systems is one of fourteen TAs that provide recommendations for the overall technology investment strategy and prioritization of NASA's space technology activities. Identified within TA-01 was the need for a green propulsion auxiliary power unit (APU) for hydraulic power by 2015. Engineers led by the author at the Marshall Space Flight Center (MSFC) have been evaluating green propellant alternatives and have begun the development of an APU test bed to demonstrate the feasibility of use. NASA has residual APU assets remaining from the retired Space Shuttle Program. Likewise, the F-16 Falcon fighter jet also uses an Emergency Power Unit (EPU) that has similar characteristics to the NASA hardware. Both EPU and APU components have been acquired for testing at MSFC. This paper will summarize the status of the testing efforts of green propellant from the Air Force Research Laboratory (AFRL) propellant AFM315E based on hydroxyl ammonium nitrate (HAN) with these test assets.

  19. Bayesian Population Projections for the United Nations

    PubMed Central

    Raftery, Adrian E.; Alkema, Leontine; Gerland, Patrick

    2014-01-01

    The United Nations regularly publishes projections of the populations of all the world’s countries broken down by age and sex. These projections are the de facto standard and are widely used by international organizations, governments and researchers. Like almost all other population projections, they are produced using the standard deterministic cohort-component projection method and do not yield statements of uncertainty. We describe a Bayesian method for producing probabilistic population projections for most countries that the United Nations could use. It has at its core Bayesian hierarchical models for the total fertility rate and life expectancy at birth. We illustrate the method and show how it can be extended to address concerns about the UN’s current assumptions about the long-term distribution of fertility. The method is implemented in the R packages bayesTFR, bayesLife, bayesPop and bayesDem. PMID:25324591

  20. Santa Clara County Planar Solid Oxide Fuel Cell Demonstration Project

    SciTech Connect

    Fred Mitlitsky; Sara Mulhauser; David Chien; Deepak Shukla; David Weingaertner

    2009-11-14

    The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project demonstrated the technical viability of pre-commercial PSOFC technology at the County 911 Communications headquarters, as well as the input fuel flexibility of the PSOFC. PSOFC operation was demonstrated on natural gas and denatured ethanol. The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project goals were to acquire, site, and demonstrate the technical viability of a pre-commercial PSOFC technology at the County 911 Communications headquarters. Additional goals included educating local permit approval authorities, and other governmental entities about PSOFC technology, existing fuel cell standards and specific code requirements. The project demonstrated the Bloom Energy (BE) PSOFC technology in grid parallel mode, delivering a minimum 15 kW over 8760 operational hours. The PSOFC system demonstrated greater than 81% electricity availability and 41% electrical efficiency (LHV net AC), providing reliable, stable power to a critical, sensitive 911 communications system that serves geographical boundaries of the entire Santa Clara County. The project also demonstrated input fuel flexibility. BE developed and demonstrated the capability to run its prototype PSOFC system on ethanol. BE designed the hardware necessary to deliver ethanol into its existing PSOFC system. Operational parameters were determined for running the system on ethanol, natural gas (NG), and a combination of both. Required modeling was performed to determine viable operational regimes and regimes where coking could occur.

  1. LOW SULFUR HOME HEATING OIL DEMONSTRATION PROJECT SUMMARY REPORT.

    SciTech Connect

    BATEY, J.E.; MCDONALD, R.J.

    2005-06-01

    This project was funded by NYSERDA and has clearly demonstrated many advantages of using low sulfur content heating oil to provide thermal comfort in homes. Prior laboratory research in the United States and Canada had indicated a number of potential benefits of using lower sulfur (0.05%) heating oil. However, this prior research has not resulted in the widespread use of low sulfur fuel oil in the marketplace. The research project described in this report was conducted with the assistance of a well-established fuel oil marketer in New York State (NYS) and has provided clear proof of the many real-world advantages of marketing and using low sulfur content No. 2 fuel oil. The very positive experience of the participating marketer over the past three years has already helped to establish low sulfur heating oil as a viable option for many other fuel marketers. In large part, based on the initial findings of this project and the experience of the participating NYS oilheat marketer, the National Oilheat Research Alliance (NORA) has already fully supported a resolution calling for the voluntary use of low sulfur (0.05 percent) home heating oil nationwide. The NORA resolution has the goal of converting eighty percent of all oil-heated homes to the lower sulfur fuel (0.05 percent by weight) by the year 2007. The Oilheat Manufacturers Association (OMA) has also passed a resolution fully supporting the use of lower sulfur home heating oil in the equipment they manufacture. These are important endorsements by prominent national oil heat associations. Using lower sulfur heating oil substantially lowers boiler and furnace fouling rates. Laboratory studies had indicated an almost linear relationship between sulfur content in the oil and fouling rates. The completed NYSERDA project has verified past laboratory studies in over 1,000 occupied residential homes over the course of three heating seasons. In fact, the reduction in fouling rates so clearly demonstrated by this project is

  2. BMDO: New Mexico Technology Transfer Demonstration Project. Interim final report

    SciTech Connect

    Not Available

    1993-11-01

    The BMDO-New Mexico Technology Transfer Demonstration Project(BMDO-NM) was a collaborative effort among the national laboratories to identify and evaluate the commercial potential of selected SDI-funded technologies. The project was funded by BMDO (formerly known as the Strategic Defense Initiative Office or SDIO), the Technology Enterprise Division (NM-TED) of the NM Economic Development Division, and the three National Laboratories. The project was managed and supervised by SAGE Management Partners of Albuquerque, and project funding was administered through the University of New Mexico. The BMDO-NM Demonstration Project focused on the development of a process to assist technology developers in the evaluation of selected BMDO technology programs so that commercialization decisions can be made in an accelerated manner. The project brought together BMDO, the NM-TED, the University of New Mexico, and three New Mexico Federal laboratories -- Los Alamos (DOE), Phillips (DOD) and Sandia (DOE). Each national laboratory actively participated throughout the project through its technology transfer offices. New Mexico was selected as the site for the Demonstration Program because of its three national and federal research laboratories engaged in BMDO programs, and the existing relationship among state govemment, the labs, universities and local economic development and business assistance organizations. Subsequent Commercialization and Implementation phases for the selected technologies from LANL and SNL were completed by SAGE and the Project Team. Funding for those phases was provided by the individual labs as well as BMDO and NM-TED in kind services. NM-TED played a proactive role in this New Mexico partnership. Its mandate is to promote technology-based economic development, with a commitment to facilitate the use of technology by industry and business statewide. TED assumed the role of program manager and executing agent for BMDO in this demonstration project.

  3. INTEGRATED GASIFICATION COMBINED CYCLE PROJECT 2 MW FUEL CELL DEMONSTRATION

    SciTech Connect

    FuelCell Energy

    2005-05-16

    With about 50% of power generation in the United States derived from coal and projections indicating that coal will continue to be the primary fuel for power generation in the next two decades, the Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCTDP) has been conducted since 1985 to develop innovative, environmentally friendly processes for the world energy market place. The 2 MW Fuel Cell Demonstration was part of the Kentucky Pioneer Energy (KPE) Integrated Gasification Combined Cycle (IGCC) project selected by DOE under Round Five of the Clean Coal Technology Demonstration Program. The participant in the CCTDP V Project was Kentucky Pioneer Energy for the IGCC plant. FuelCell Energy, Inc. (FCE), under subcontract to KPE, was responsible for the design, construction and operation of the 2 MW fuel cell power plant. Duke Fluor Daniel provided engineering design and procurement support for the balance-of-plant skids. Colt Engineering Corporation provided engineering design, fabrication and procurement of the syngas processing skids. Jacobs Applied Technology provided the fabrication of the fuel cell module vessels. Wabash River Energy Ltd (WREL) provided the test site. The 2 MW fuel cell power plant utilizes FuelCell Energy's Direct Fuel Cell (DFC) technology, which is based on the internally reforming carbonate fuel cell. This plant is capable of operating on coal-derived syngas as well as natural gas. Prior testing (1992) of a subscale 20 kW carbonate fuel cell stack at the Louisiana Gasification Technology Inc. (LGTI) site using the Dow/Destec gasification plant indicated that operation on coal derived gas provided normal performance and stable operation. Duke Fluor Daniel and FuelCell Energy developed a commercial plant design for the 2 MW fuel cell. The plant was designed to be modular, factory assembled and truck shippable to the site. Five balance-of-plant skids incorporating fuel processing, anode gas oxidation, heat recovery, water

  4. Residential Energy Efficiency Demonstration: Hawaii and Guam Energy Improvement Technology Demonstration Project

    SciTech Connect

    Earle, L.; Sparn, B.; Rutter, A.; Briggs, D.

    2014-03-01

    In order to meet its energy goals, the Department of Defense (DOD) has partnered with the Department of Energy (DOE) to rapidly demonstrate and deploy cost-effective renewable energy and energy-efficiency technologies. The scope of this project was to demonstrate tools and technologies to reduce energy use in military housing, with particular emphasis on measuring and reducing loads related to consumer electronics (commonly referred to as 'plug loads'), hot water, and whole-house cooling.

  5. Green Propulsion Auxiliary Power Unit Demonstration at MSFC

    NASA Technical Reports Server (NTRS)

    Robinson, Joel W.; Beckel, Steve

    2014-01-01

    In 2012, the National Aeronautics & Space Administration (NASA) Space Technology Mission Directorate (STMD) began the process of building an integrated technology roadmap, including both technology pull and technology push strategies. Technology Area 1 (TA-01) for Launch Propulsion Systems is one of fourteen TA's that provide recommendations for the overall technology investment strategy and prioritization of NASA's space technology activities. Identified within TA-01 was the need for a green propulsion auxiliary power unit (APU) for hydraulic power by 2015. Engineers led by the author at the Marshall Space Flight Center (MSFC) have been evaluating green propellant alternatives and have begun the development of an APU testbed to demonstrate the feasibility of use. NASA has residual APU assets remaining from the retired Space Shuttle Program. Likewise, the F-16 Falcon fighter jet also uses an Emergency Power Unit (EPU) that has similar characteristics to the NASA hardware. Both EPU's and APU components have been acquired for testing at MSFC. In concert with this effort, ATK has been developing green propellant technology based on the Swedish Space Corp ECAPS LMP-103S propellant. Propellant blending and test facilities have been established at ATK's Elkton MD facility with the intent to provide suitable propellant blends for application to green APU systems as well as thrusters. This paper will summarize the status of the testing efforts with ATK for use of the green propellant LMP-103S based on ammonium dinitramide and use of the Air Force Research Laboratory (AFRL) propellant AF-M315E based on hydroxyl ammonium nitrate with these test assets.

  6. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    SciTech Connect

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-15

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables.

  7. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    SciTech Connect

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  8. AN OPTICAL CHARACTER RECOGNITION RESEARCH AND DEMONSTRATION PROJECT.

    ERIC Educational Resources Information Center

    1968

    RESEARCH AND DEVELOPMENT OF PROTOTYPE LIBRARY SYSTEMS WHICH UTILIZE OPTICAL CHARACTER RECOGNITION INPUT HAS CENTERED AROUND OPTICAL PAGE READERS AND DOCUMENT READERS. THE STATE-OF-THE-ART OF BOTH THESE OPTICAL SCANNERS IS SUCH THAT BOTH ARE ACCEPTABLE FOR LIBRARY INPUT PREPARATION. A DEMONSTRATION PROJECT UTILIZING THE TWO TYPES OF READERS, SINCE…

  9. In-place nuclear reactor vessel annealing demonstration project

    SciTech Connect

    Howell, D.

    1994-09-01

    The objective of this paper was a discussion of the proposed annealing demonstration project at the canceled Marble Hill-1 reactor. The discussion, which was a compilation of transparencies on the noted subject, included overall objectives, scope of work, staging of equipment, and analytical objectives. Current status, including funding was summarized.

  10. Rural Workplace Literacy Demonstration Project. Welding Curriculum. Dorsey Trailers, Inc.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This curriculum guide contains workplace-specific instructional materials developed for use in a rural workplace literacy demonstration project, specifically with welders. Contents include a student assessment form, instructional objectives, pre- and posttests, learning activities (some locally developed and some selected from commercially…

  11. Tidd PFBC Demonstration Project: Public final design report

    SciTech Connect

    Not Available

    1992-10-01

    This Public Final Design Report describes the 70 MW(e) Tidd PFBC Demonstration Plant under construction in Brilliant, Ohio. This project is receiving cost-sharing from the US Department of Energy (DOE), and is being administered by the Morgantown Energy Technology Center in accordance with DOE Cooperative Agreement No. DE-FC21-87 MC24132.000. The project is also receiving costsharing from the State of Ohio. This award is being administered by the Ohio Coal Development Office. The Tidd PFBC Demonstration Project is the first utility-scale demonstration project in the US. Its objective is to demonstrate that the Pressurized Fluidized Bed Combustion (PFBC) combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. Detailed design of the plant began in May 1987, leading to the start of construction in April 1988. First coal fire occurred in November 1990, and the three-year test program began in February 1991.

  12. Prioritization of Ecosystem Services Research: Tampa Bay Demonstration Project.

    EPA Science Inventory

    The Tampa Bay Ecosystem Services Demonstration Project (TBESDP) is a component of the U.S. Environmental Protection Agency’s Ecosystem Services Research Program. The principal objectives of TBESDP are (1) to quantify the ecosystem services of the Tampa Bay watershed, (2) to deter...

  13. Bilingual Readiness in Primary Grades; An Early Childhood Demonstration Project.

    ERIC Educational Resources Information Center

    King, Paul E.

    The dual objective of this demonstration project was to show "how the reality of two or more language and ethnic groups present within one integrated classroom could be utilized to develop (1) bilingual readiness in both English-speaking and Spanish-speaking children, and (2) positive attitudes toward and respect for one's own native language and…

  14. Pittsburgh Technical Health Training Institute Demonstration Project; Quarterly Report.

    ERIC Educational Resources Information Center

    Kishkunas, Louis J.

    This fifth quarterly report covers the period June 15, 1967 to December 15, 1967 of a project aimed at demonstrating a faster method of training higly qualified workers for the health field. During this period, nurse aides were trained in a pilot program based upon the educational objectives derived from entry level behavioral specifications…

  15. NRC assessment of the Department of Energy annealing demonstration project

    SciTech Connect

    Jackson, D.A.; Malik, S.N.

    1997-02-01

    Thermal annealing is the only known method for mitigating the effects of neutron irradiation embrittlement in reactor pressure vessel (RPV) steels. In May 1996, the US Department of Energy (DOE) in conjunction with the American Society of Mechanical Engineers, Westinghouse, Cooperheat, Electric Power Research Institute (with participating utilities), Westinghouse Owner`s Group, Consumers Power, Electricite` de France, Duquesne Light and the Central Research Institute of the Electric Power Industry (Japan) sponsored an annealing demonstration project (ADP) at Marble Hill. The Marble Hill Plant, located in Madison, Indiana, is a Westinghouse 4 loop design. The plant was nearly 70% completed when the project was canceled. Hence, the RPV was never irradiated. The paper will present highlights from the NRCs independent evaluation of the Marble Hill Annealing Demonstration Project.

  16. A helmet mounted display demonstration unit for a Space Station application

    NASA Technical Reports Server (NTRS)

    Gernux, Carolyn G.; Blaser, Robert W.; Marmolejo, Jose

    1989-01-01

    Under NASA guidance an advanced development helmet mounted display (HMD) has been designed and fabricated. Delivery has been made of an extravehicular mobility unit (EMU) HMD demonstration unit as an alternative to the current low-resolution, chest-mounted display, and cuff-mounted checklists. Important design goals achieved with this HMD include the use of transmissive liquid display image sources with fairly high resolution (text, graphics, and video compatible), binocular viewing with total image overlap, virtual image projection, low profile packaging, low power design, and demonstration of voice control of the HMD data. Test results showed that the HMD program successfully demonstrated the feasibility of the concept and operated as designed, meeting the necessary program requirements.

  17. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    SciTech Connect

    Not Available

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  18. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  19. Human habitation field study of the Habitat Demonstration Unit (HDU)

    NASA Astrophysics Data System (ADS)

    Litaker, Harry L.; Archer, Ronald D.; Szabo, Richard; Twyford, Evan S.; Conlee, Carl S.; Howard, Robert L.

    2013-10-01

    Landing and supporting a permanent outpost on a planetary surface represents humankind's capability to expand its own horizons and challenge current technology. With this in mind, habitability of these structures becomes more essential given the longer durations of the missions. The purpose of this evaluation was to obtain preliminary human-in-the-loop performance data on the Habitat Demonstration Unit (HDU) in a Pressurized Excursion Module (PEM) configuration during a 14-day simulated lunar exploration field trial and to apply this knowledge to further enhance the habitat's capabilities for forward designs. Human factors engineers at the NASA/Johnson Space Center's Habitability and Human Factors Branch recorded approximately 96 h of crew task performance with four work stations. Human factors measures used during this study included the NASA Task Load Index (TLX) and customized post questionnaires. Overall the volume for the PEM was considered acceptable by the crew; however; the habitat's individual work station volume was constrained when setting up the vehicle for operation, medical operations, and suit maintenance while general maintenance, logistical resupply, and geo science was considered acceptable. Crew workload for each station indicated resupply as being the lowest rated, with medical operations, general maintenance, and geo science tasks as being light, while suit maintenance was considered moderate and general vehicle setup being rated the highest. Stowage was an issue around the habitat with the Space Exploration Vehicle (SEV) resupply stowage located in the center of the habitat as interfering with some work station volumes and activities. Ergonomics of the geo science station was considered a major issue, especially with the overhead touch screens.

  20. Power generator design for the billings MHD demonstration project

    SciTech Connect

    Pian, C.C.P.; Kessler, R.; Schmitt, E.W.; Morrison, D.J.

    1993-12-31

    The proposed design of the MHD Power generator for the Billings MHD Demonstration Project is presented. The Billings MHD Demonstration Project, proposed by the MHD Development Corporation (MDC) for the U.S. Department of Energy`s Clean Coal Technology V Program, will demonstrate the significant environmental advantages and efficiency potential of MHD electric power generation. A diagonally-loaded, supersonic MHD generator channel is proposed. The generator channel has a thermal input of 250 MW, is 11 meters long and produces 28.5 MW gross power output at the nominal design operating condition. The gasdynamic, gas-side, and mechanical designs of the proposed generator are derived from the design of the 50 MW{sub t} proof-of-concept MHD generator, currently undergoing long duration testing at the CDIF test facility. The design and operation of the proposed generator will be typical of those anticipated in future commercial MHD generator channels.

  1. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    SciTech Connect

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  2. A Practical Demonstration Project in Teaching Technical Mathematics; Final Progress Report.

    ERIC Educational Resources Information Center

    McHale, Thomas J.; Witzke, Paul T.

    The primary purposes of this developmental and demonstration project were to reduce the number of dropouts and failures and to increase the amount of learning in the technical mathematics core courses. In June 1965 a decision was made to pilot test locally developed programed units in technical mathematics. After the identification of the desired…

  3. Rod consolidation at the West Valley Demonstration Project

    SciTech Connect

    Bailey, W.J.

    1986-12-01

    A rod consolidation demonstration with irradiated pressurized water reactor fuel was recently conducted by personnel from Nuclear Assurance Corporation and West Valley Nuclear Services Company at the West Valley Demonstration Project in West Valley, New York. The rod consolidation demonstration involved pulling all of the fuel rods from six fuel Assemblies. In general, the rod pulling proceeded smoothly. The highest compaction ratio attained was 1:8:1. Among the total of 1074 fuel rods were some known degraded rods (they had collapsed cladding, a result of in-reactor fuel densification), but no rods were broken or dropped during the demonstration. One aim was to gather information on the effect of rod consolidation operations on the integrity of the fuel rods during subsequent handling and storage. Another goal was to collect information on the condition and handling of intact, damaged, and failed fuel that has been in storage for an extended period. 9 refs., 8 figs., 1 tab.

  4. An Optical Demonstration Project For The HESSI Rotating Modulation Collimator

    NASA Astrophysics Data System (ADS)

    Lowe-Schmahl, B.; Schmahl, K.; Mengel, T.; Schmahl, E.

    2000-05-01

    Our 4-7th grade Workshop students made a working prototype of a HESSI rotating modulation collimator (RMC) using PVC pipe, PVC couplers, grid transparencies, a dot matrix (tractor feed) printer, and a slide projector. The idea is to rotate two four-inch long telescopes end-to-end on the same printer roller. Each telescope has two grids and are placed an inch or two apart. They have the same rotational axis and all the grids are parallel. The light beam comes in and hits the imaging telescope. The light going out of it hits a diffusion screen (translucent plastic) and then continues, diffused, into the back-projection telescope. Polaroid film and a modified Polaroid camera sum the back-projection data. The camera is modified by removing the front focusing lens, replacing it with a 4-inch lens, creating a shutter system using layered cardboard and gluing the shutter system to the front of the camera. The shutter system is opened and the film exposed through one complete rotation of the model HESSI Telescope. To our students' amazement a back projection was successfully obtained on the print! The HESSI Telescope Demonstration project provides the impetus for students to stretch their mental boundaries. This project promotes the goals of ``learn one, do one, teach one": 1) Learn one: students must research the field and subject matter for the telescope; 2) Do one: By designing, developing and implementing their project, they are in essence performing valid research, which is the end result of all scientific inquiries; 3) Teach one: By incorporating both written and oral presentations of their projects and through interaction with a scientist and/or engineering mentor, students are given the unique opportunity to experience the peer review process that all scientists and engineers must undergo. We would like to thank the HESSI team of NASA Goddard Space Flight Center for their on-going support of our students' project.

  5. FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT

    SciTech Connect

    Stephen P. Bergin

    2003-04-23

    This project has two primary purposes: (1) Build a small-footprint (SFP) fuel production plant to prove the feasibility of this relatively transportable technology on an intermediate scale (i.e. between laboratory-bench and commercial capacity) and produce as much as 150,000 gallons of hydrogen-saturated Fischer-Tropsch (FT) diesel fuel; and (2) Use the virtually sulfur-free fuel produced to demonstrate (over a period of at least six months) that it can not only be used in existing diesel engines, but that it also can enable significantly increased effectiveness and life of the next-generation exhaust-after-treatment emission control systems that are currently under development and that will be required for future diesel engines. Furthermore, a well-to-wheels economic analysis will be performed to characterize the overall costs and benefits that would be associated with the actual commercial production, distribution and use of such FT diesel fuel made by the process under consideration, from the currently underutilized (or entirely un-used) energy resources targeted, primarily natural gas that is stranded, sub-quality, off-shore, etc. During the first year of the project, which is the subject of this report, there have been two significant areas of progress: (1) Most of the preparatory work required to build the SFP fuel-production plant has been completed, and (2) Relationships have been established, and necessary project coordination has been started, with the half dozen project-partner organizations that will have a role in the fuel demonstration and evaluation phase of the project. Additional project tasks directly related to the State of Alaska have also been added to the project. These include: A study of underutilized potential Alaska energy resources that could contribute to domestic diesel and distillate fuel production by providing input energy for future commercial-size SFP fuel production plants; Demonstration of the use of the product fuel in a heavy

  6. Overview of the MARS Laser Communications Demonstration Project

    NASA Technical Reports Server (NTRS)

    Edward, Bernard L.; Townes, Stephen A.; Bondurant, Roy S.; Scozzafava, Joseph J.; Boroson, Don M.; Parvin, Ben A.; Biswas, Abhijit; Pillsbury, Alan D.; Khatri, Farzana I.; Burnside, Jamie W.

    2003-01-01

    This paper provides an overview of the Mars Laser Communications Demonstration Project, a joint project between NASA s Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). It reviews the strawman designs for the flight and ground segments, the critical technologies required, and the concept of operations. It reports preliminary conclusions from the Mars Lasercom Study conducted at MIT/LL and on additional work done at JPL and GSFC. The lasercom flight terminal will be flown on the Mars Telecom Orbiter (MTO) to be launched by NASA in 2009, and will demonstrate a technology which has the potential of vastly improving NASA s ability to communicate throughout the solar system.

  7. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  8. INITIAL DESIGNS OF ELECTRIC-DISCHARGE NON-THERMAL PLASMA FIELD-PILOT DEMONSTRATION UNITS FOR NOX REMOVAL IN JET-ENGINE EXHAUST: WHITE PAPER FOR SERDP PROJECT CP-1038

    EPA Science Inventory

    Incentives for implementing new pollution-control technologies are both regulatory and economic. Given considerable regulatory pressure, e.g., the promulgation of a NESHAPS for NOx emissions in CY 2000, new de-NOx technologies are being explored. This project is currently evaluat...

  9. ECONOMIC ASSESSMENT OF PROPOSED ELECTRIC-DISCHARGE NON-THERMAL PLASMA FIELD-PILOT DEMONSTRATION UNITS FOR NOX REMOVAL IN JET-ENGINE EXHAUST: WHITE PAPER FOR SERDP PROJECT CP-1038

    EPA Science Inventory

    This project is currently evaluating non-thermal plasma (NTP) technologies for treating jet-engine exhaust arising from DoD test facilities. In the past, some economic analyses for NTP de-NOx have shown that it is not economical, compared to other techniques. The main reasons fo...

  10. NASA systems autonomy demonstration project: Advanced automation demonstration of Space Station Freedom thermal control system

    NASA Technical Reports Server (NTRS)

    Dominick, Jeffrey; Bull, John; Healey, Kathleen J.

    1990-01-01

    The NASA Systems Autonomy Demonstration Project (SADP) was initiated in response to Congressional interest in Space station automation technology demonstration. The SADP is a joint cooperative effort between Ames Research Center (ARC) and Johnson Space Center (JSC) to demonstrate advanced automation technology feasibility using the Space Station Freedom Thermal Control System (TCS) test bed. A model-based expert system and its operator interface were developed by knowledge engineers, AI researchers, and human factors researchers at ARC working with the domain experts and system integration engineers at JSC. Its target application is a prototype heat acquisition and transport subsystem of a space station TCS. The demonstration is scheduled to be conducted at JSC in August, 1989. The demonstration will consist of a detailed test of the ability of the Thermal Expert System to conduct real time normal operations (start-up, set point changes, shut-down) and to conduct fault detection, isolation, and recovery (FDIR) on the test article. The FDIR will be conducted by injecting ten component level failures that will manifest themselves as seven different system level faults. Here, the SADP goals, are described as well as the Thermal Control Expert System that has been developed for demonstration.

  11. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    SciTech Connect

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  12. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  13. Childhood Obesity Research Demonstration Project: Cross-Site Evaluation Methods

    PubMed Central

    Lee, Rebecca E.; Mehta, Paras; Thompson, Debbe; Bhargava, Alok; Carlson, Coleen; Kao, Dennis; Layne, Charles S.; Ledoux, Tracey; O'Connor, Teresia; Rifai, Hanadi; Gulley, Lauren; Hallett, Allen M.; Kudia, Ousswa; Joseph, Sitara; Modelska, Maria; Ortega, Dana; Parker, Nathan; Stevens, Andria

    2015-01-01

    Abstract Introduction: The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which the CORD model is associated with changes in behavior, body weight, BMI, quality of life, and healthcare satisfaction in children 2–12 years of age. Design/Methods: The CORD Evaluation Center (EC-CORD) will analyze the pooled data from three independent demonstration projects that each integrate public health and primary care childhood obesity interventions. An extensive set of common measures at the family, facility, and community levels were defined by consensus among the CORD projects and EC-CORD. Process evaluation will assess reach, dose delivered, and fidelity of intervention components. Impact evaluation will use a mixed linear models approach to account for heterogeneity among project-site populations and interventions. Sustainability evaluation will assess the potential for replicability, continuation of benefits beyond the funding period, institutionalization of the intervention activities, and community capacity to support ongoing program delivery. Finally, cost analyses will assess how much benefit can potentially be gained per dollar invested in programs based on the CORD model. Conclusions: The keys to combining and analyzing data across multiple projects include the CORD model framework and common measures for the behavioral and health outcomes along with important covariates at the individual, setting, and community levels. The overall objective of the comprehensive evaluation will develop evidence-based recommendations for replicating and disseminating community-wide, integrated public health and primary care programs based on the CORD model. PMID:25679060

  14. Advanced Coal Conversion Process Demonstration Project. Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  15. PROJECT RE-ED, A DEMONSTRATION PROJECT FOR THE REEDUCATION OF EMOTIONALLY DISTURBED CHILDREN.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Mental Health, Raleigh.

    THE PROJECT FOR THE REEDUCATION OF EMOTIONALLY DISTURBED CHILDREN (PROJECT RE-ED), A DEMONSTRATION PROJECT (1961-1968) TO DEVELOP AND EVALUATE THE EFFECTIVENESS OF RESIDENTIAL SCHOOLS (SUNDAY THROUGH FRIDAY) FOR DISTURBED CHILDREN, IS DESCRIBED. THE PROFESSIONAL TRAINING AT GEORGE PEABODY COLLEGE, TENNESSEE, AND USE OF CAREFULLY SELECTED…

  16. Thermal Performance of ATLAS Laser Thermal Control System Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Ku, Jentung; Robinson, Franklin; Patel, Deepak; Ottenstein, Laura

    2013-01-01

    than 135 watts of heater power. 4) The LHP reservoir control heater power is limited to 15 watts with a 70 percent duty cycle. 5) The voltage of the power supply can vary between 26 volts direct current and 34 volts direct current during the spacecraft lifetime. A design analysis shows that a single LTCS can satisfy these requirements. However, shutdown of· the LHP is particularly challenging and the shutdown heater must be wired in series with two reservoir thermostats and two CCHP thermostats at different set points. An LTCS demonstration unit has been tested to verify these performance characteristics experimentally prior to proceeding to the final LTCS design and fabrication. Test results showed that the LHP shutdown scheme would be able to shut down the LHP as designed and the reservoir control heater can maintain the ATLAS mass simulator within the plus or minus 1 degrees Centigrade accuracy under various combinations of the heat load, sink temperature, and power supply voltage.

  17. Air-blown Integrated Gasification Combined Cycle demonstration project

    SciTech Connect

    Not Available

    1991-01-01

    Clean Power Cogeneration, Inc. (CPC) has requested financial assistance from DOE for the design construction, and operation of a normal 1270 ton-per-day (120-MWe), air-blown integrated gasification combined-cycle (IGCC) demonstration plant. The demonstration plant would produce both power for the utility grid and steam for a nearby industrial user. The objective of the proposed project is to demonstrate air-blown, fixed-bed Integrated Gasification Combined Cycle (IGCC) technology. The integrated performance to be demonstrated will involve all the subsystems in the air-blown IGCC system to include coal feeding; a pressurized air-blown, fixed-bed gasifier capable of utilizing caking coal; a hot gas conditioning systems for removing sulfur compounds, particulates, and other contaminants as necessary to meet environmental and combustion turbine fuel requirements; a conventional combustion turbine appropriately modified to utilize low-Btu coal gas as fuel; a briquetting system for improved coal feed performance; the heat recovery steam generation system appropriately modified to accept a NO{sub x} reduction system such as the selective catalytic reduction process; the steam cycle; the IGCC control systems; and the balance of plant. The base feed stock for the project is an Illinois Basin bituminous high-sulfur coal, which is a moderately caking coal. 5 figs., 1 tab.

  18. The Plasma Hearth Process demonstration project for mixed waste treatment

    SciTech Connect

    Geimer, R.; Dwight, C.; McClellan, G.

    1994-07-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Integrated Program (MWIP). Testing to date has yielded encouraging results in displaying potential applications for the PHP technology. Early tests have shown that a wide range of waste materials can be readily processed in the PHP and converted to a vitreous product. Waste materials can be treated in their original container as received at the treatment facility, without pretreatment. The vitreous product, when cooled, exhibits excellent performance in leach resistance, consistently exceeding the Environmental Protection Agency (EPA) Toxicity Characteristic Leaching Procedure (TCLP) requirements. Performance of the Demonstration System during test operations has been shown to meet emission requirements. An accelerated development phase, being conducted at both bench- and pilot-scale on both nonradioactive and radioactive materials, will confirm the viability of the process. It is anticipated that, as a result of this accelerated technology development and demonstration phase, the PHP will be ready for a final field-level demonstration within three years.

  19. Advanced secondary recovery demonstration for the Sooner Unit. [Quarterly] report, October 1992--January 1993

    SciTech Connect

    Sippel, M.; Junkin, J.; Pritchett, R.; Hardage, B.

    1993-02-24

    The objectives of the project are to demonstrate the effectiveness of geologically targeted infill drilling and improved reservoir management to obtain maximum oil recovery from the Sooner Unit field using water injection and gas recycling as secondary methods. The first phase of the project involves an integrated multi-discipline approach to identify optimum well sites and development of a reservoir operations plan. The second phase will involve drilling of up to three geologically targeted infill wells and establishing production/injection schedules. Reservoir simulation, transient well tests and careful production monitoring will be used to evaluate the results. The third phase will involve technology transfer through a series of technical papers and presentations of a short course. Emphasis will be on the economics of the project and the implemented technologies. Summary of technical progress is presented for: Well drilling and completion; seismic data acquisition; and geologic and engineering interpretation.

  20. Advanced secondary recovery demonstration for the Sooner Unit. [Quarterly] report, February--April 1993

    SciTech Connect

    Sippel, M.; Junkin, J.; Pritchett, R.; Hardage, B.

    1993-05-20

    The objectives of the project are to demonstrate the effectiveness of geologically targeted infill drilling and improved reservoir management to obtain maximum oil recovery from the Sooner Unit field using water injection and gas recycling as secondary methods. The first phase of the project involves an integrated multi-discipline approach to identify optimum well sites and development of a reservoir operations plan. The second phase will involve drilling of up to three geologically targeted infill wells and establishing production/injection schedules. Reservoir simulation, transient well tests and careful production monitoring will be used to evaluate the results. The third phase will involve technology transfer through a series of technical papers and presentations of a short course. Emphasis will be on the economics of the project and the implemented technologies.

  1. Green Propulsion Auxiliary Power Unit Demonstration at MSFC

    NASA Technical Reports Server (NTRS)

    Robinson, Joel W.

    2014-01-01

    MSFC has embarked on use of green propellant replacement of hydrazine for a variety of applications. This paper focused on activities for auxiliary power unit but MSFC is actively investigating use of green propellants for thruster applications. MSFC is interested in partnership with the international community to address the infusion of green propellant into greater use.

  2. Customer-focused planning: Demonstration project summaries. Final report

    SciTech Connect

    George, S.S.

    1992-12-01

    To succeed in the increasingly competitive and dynamic markets in which they operate, electric utilities are focusing ever greater attention on understanding and meeting customer needs. EPRI`s Customer Focused Planning (CFP) project was established to develop concepts and tools that will help utilities enhance their commitment to customer service. The project team conducted a series of interviews and meetings with participating utilities to collaboratively implement crucial steps in the CFP process. Although there is no unique set of tools or single management approach for improving product and service delivery, customer-focused companies have at least five ideals in common. They (1) define goals and objectives in concrete terms, (2) extend the planning boundaries of the organization to include all members of the energy services infrastructure, (3) painstakingly link functional activities directly to customer needs, (4) incorporate the customer`s voice in new product/ service design, and (5) align performance measures with customer needs. In addition, customer-focused companies use a variety of methods to improve customer satisfaction and company performance. These methods include conducting market research, developing market processes such as demand-side management contracting or bidding to reveal customer preferences, and involving customers more directly in the planning process. This report summarizes two brief demonstration projects conducted as part of EPRI`s CFP project, one at Commonwealth Edison Company (CECo) and one at PSI Energy. The CECo project emphasized developing customer-focused performance measures for telephone inquiries. The PSI Energy project involved a one-day workshop underscoring two important CFP elements-understanding customer wants and explicitly linking those wants to utility activities.

  3. Emergency contraception: preliminary report of a demonstration and evaluation project.

    PubMed

    Petitti, D B; Harvey, S M; Preskill, D; Beckman, L J; Postlethwaite, D; Switzky, H; Sherman, C

    1998-01-01

    Kaiser Permanente Southern California and the Pacific Institute for Women's Health began a demonstration and evaluation project on emergency contraceptive pills (ECPs) in the summer of 1996 with the goal of evaluating the feasibility and acceptability of ECPs in a large health maintenance organization and developing institutional templates, provider training and patient education materials that could be used to replicate the project. The ECP program had six components: repackaging of oral contraceptives in an ECP "kit," development of provider education materials, development of patient education materials, in-service training, making ECPs kits available in convenient locations, and development of materials to support replication of the project inside and outside Kaiser Permanente. Although data are still being analyzed, preliminary results are promising. The success of the project within this relatively conservative, but well-established medical care organization provides a model for others. The development of a standard set of educational materials and approaches to implementation should facilitate dispensing ECPs in other settings. PMID:9859634

  4. Diesel fueled ship propulsion fuel cell demonstration project

    SciTech Connect

    Kumm, W.H.

    1996-12-31

    The paper describes the work underway to adapt a former US Navy diesel electric drive ship as a 2.4 Megawatt fuel cell powered, US Coast Guard operated, demonstrator. The Project will design the new configuration, and then remove the four 600 kW diesel electric generators and auxiliaries. It will design, build and install fourteen or more nominal 180 kW diesel fueled molten carbonate internal reforming direct fuel cells (DFCs). The USCG cutter VINDICATOR has been chosen. The adaptation will be carried out at the USCG shipyard at Curtis Bay, MD. A multi-agency (state and federal) cooperative project is now underway. The USCG prime contractor, AEL, is performing the work under a Phase III Small Business Innovation Research (SBIR) award. This follows their successful completion of Phases I and II under contract to the US Naval Sea Systems (NAVSEA) from 1989 through 1993 which successfully demonstrated the feasibility of diesel fueled DFCs. The demonstrated marine propulsion of a USCG cutter will lead to commercial, naval ship and submarine applications as well as on-land applications such as diesel fueled locomotives.

  5. Demonstrating Robotic Autonomy in NASA's Intelligent Systems Project

    NASA Technical Reports Server (NTRS)

    Morris, Robert; Smith, Ben; Estlin, Tara; Pedersen, Liam

    2004-01-01

    This paper will provide an overview of NASA's investments in autonomy during the past five years within the Intelligent Systems Project, with particular attention paid to investments that have resulted in mission infusion of autonomy technology, in particular, into the recent Mars Exploration Rover (MER) mission. The content of the paper will be divided into two primary topic areas: a technical overview of the component technologies developed under the program, and a programmatic overview of the history and organization of the NASA IS project itself, with a focus on describing the program elements related to autonomy and intelligent robotics. The paper will also provide an overview of the September 2004 autonomy demonstrations, including a discussion of objectives, organization, and preliminary results (to the extent they are available before the submission deadline).

  6. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    NASA Technical Reports Server (NTRS)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  7. Photovoltaic test and demonstration project. [residential energy program

    NASA Technical Reports Server (NTRS)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  8. West Valley Demonstration Project site environmental report, calendar year 1997

    SciTech Connect

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  9. North Village Ground Source Heat Pump Demonstration Project

    SciTech Connect

    Redderson, Jeff

    2015-08-03

    This project demonstrated the feasibility of converting from a traditional direct exchange system to a ground source heat pump system on a large scale, multiple building apartment complex on a university campus. A total of ten apartment buildings were converted using vertical well fields and a ground source loop that connected the 24 apartments in each building into a common system. The system has yielded significant operational savings in both energy and maintenance and transformed the living environments of these residential buildings for our students.

  10. Hudson River PCB reclamation demonstration project, New York

    SciTech Connect

    Not Available

    1982-11-01

    An abstract of the final environmental impact statement (EIS) for a demonstration project to dredge Hudson River sediments to remove polychlorinated biphenyl (PCB) contamination describes an effort to reduce the 40 hot spots by half. Positive impacts would be the removal of potential health hazards, but there is a risk that the dredging operations will release some contaminants into the surrounding water, leaving PCBs in the water and no longer contained. The Federal Water Pollution Control Act of 1972 is the legal mandate for the EIS.

  11. York County Energy Partners DOE CCI ACFB demonstration project

    SciTech Connect

    Wang, S. ); Cox, J.; Parham, D. )

    1992-01-01

    The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world's largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy's Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

  12. York County Energy Partners DOE CCI ACFB demonstration project

    SciTech Connect

    Wang, S.; Cox, J.; Parham, D.

    1992-09-01

    The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world`s largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy`s Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

  13. West Valley Demonstration Project site environmental report, calendar year 1999

    SciTech Connect

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  14. West Valley Demonstration Project site environmental report calendar year 1998

    SciTech Connect

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  15. Tidd PFBC Demonstration Project. Quarterly report, January--March 1994

    SciTech Connect

    Not Available

    1994-04-01

    This is the 28th Technical Progress Report submitted to the Department of Energy in connection with the Cooperative Agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period of January 1, 1994 to March 31, 1994. Major activities during this period include: (1) The unit operated for 850 hours on coal, bringing the grand total for coal fire through the end of the quarter to 6318 hours. (2) The unit availability for the first quarter was 40.1%. (3) There were twelve gas turbine starts, eight bed preheater starts, and six operating periods on coal. (4) During this quarter, total gross generation was 40,721 MWH, the peak unit output for one hour was 62 MWH, and the coal consumption was 19,370 tons. (5) Three performance tests were conducted during this quarter; and (6) the plant was able to remain in service during the sub-zero weather in January, providing power to the critically short grid.

  16. Brief History of the Lightcraft Technology Demonstrator (LTD) Project

    NASA Astrophysics Data System (ADS)

    Myrabo, Leik N.

    2003-05-01

    This paper presents a brief history of the laser lightcraft research and development project that lead to the first outdoor free-flight demonstrations for the U.S. government on November 1997 - using the 10 kW PLVTS CO2 laser at the High Energy Laser Systems Test Facility (HELSTF), White Sands Missile Range (WSMR), NM. Summarized herein are some of the technological milestones that brought the Lightcraft Technology Demonstrator (LTD) concept vehicle to its present state of development: 1) from the initial LTD conceptual design, systems integration, and performance analysis for the Strategic Defense Initiative Organization (SDIO) 2) through laboratory engine bench testing, indoor wire-guided and vertical free-flight testing phases under contract to NASA and the USAF; and 3) finally resulting in outdoor flights to the current record altitude of 71 meters (233 ft) on 2 October 2000, sponsored by the Foundation for International Non-governmental Development of Space (FINDS).

  17. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    NASA Technical Reports Server (NTRS)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  18. Ground operations demonstration unit for liquid hydrogen initial test results

    NASA Astrophysics Data System (ADS)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-12-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  19. Residential construction demonstration project, Cycle II: Active ventilation

    SciTech Connect

    Not Available

    1991-01-01

    This report documents the analysis of the performance of natural and mechanical ventilation in Pacific Northwest homes. The analysis was part of Cycle II of the Residential Construction Demonstration Project, sponsored by Bonneville Power Administration (BPA). Since 1986, the Residential Construction Demonstration Project (RCDP) has sponsored the collection of data on energy efficient homes in the Pacific Northwest that comply with these new standards and requirements. Cycle II of RCDP was conducted between September 1987 and April 1990. It concentrated on energy innovations in homes built to the Super Good Cents specification. All of the test homes have electric heat and mechanical ventilation systems. Seven different types of active ventilation systems are represented in the homes. Three of these system types are equipped with heat recovery devices, and are represented in approximately a quarter of the test homes. The potential for both natural and mechanical ventilation was measured. Potential structural leakage was measured by blower door testing. Flow rate and operating time of mechanical ventilation systems were measured with flow hoods and hour meters. Actual ventilation was measured by using a passive tracer gas technique for several weeks during the heating season and at times of normal occupancy.

  20. Residential construction demonstration project, Cycle II: Active ventilation

    SciTech Connect

    Not Available

    1991-12-31

    This report documents the analysis of the performance of natural and mechanical ventilation in Pacific Northwest homes. The analysis was part of Cycle II of the Residential Construction Demonstration Project, sponsored by Bonneville Power Administration (BPA). Since 1986, the Residential Construction Demonstration Project (RCDP) has sponsored the collection of data on energy efficient homes in the Pacific Northwest that comply with these new standards and requirements. Cycle II of RCDP was conducted between September 1987 and April 1990. It concentrated on energy innovations in homes built to the Super Good Cents specification. All of the test homes have electric heat and mechanical ventilation systems. Seven different types of active ventilation systems are represented in the homes. Three of these system types are equipped with heat recovery devices, and are represented in approximately a quarter of the test homes. The potential for both natural and mechanical ventilation was measured. Potential structural leakage was measured by blower door testing. Flow rate and operating time of mechanical ventilation systems were measured with flow hoods and hour meters. Actual ventilation was measured by using a passive tracer gas technique for several weeks during the heating season and at times of normal occupancy.

  1. The WMO Coastal Inundation Forecasting Demonstration Project (CIFDP)

    NASA Astrophysics Data System (ADS)

    Lee, Boram; Resio, Don; Swail, Val; Fakhruddin, Shm; Horsburgh, Kevin

    2014-05-01

    Coastal inundations are an increasing threat to the lives and livelihoods of people living in low-lying, highly-populated coastal areas. According to the World Bank Report 2005, at least 2.6 million people have drowned in coastal inundation, particularly caused by storm surges, over the last 200 years. The purpose of the WMO Coastal Inundation Forecasting Demonstration Project (CIFDP) is to meet the challenges of coastal communities' safety and to support sustainable development through enhancing coastal inundation forecasting and warning systems at the regional scale. Upon completion of national sub-projects of CIFDP, countries will implement an operational system for integrated coastal inundation forecasting and warning, providing an objective basis for coastal disaster (flooding) management; contributing to saving lives, reducing loss of livelihood and property, and enhancing resilience and sustainability in coastal communities. Operation and maintenance of the CIF system would be the responsibility of national operational agencies with a mandate for coastal inundation warnings. The main focus of the CIFDP will be to facilitate the development of efficient forecasting and warning systems for coastal inundation based on robust science and observations: The presentation will describe the scope and the technical framework for CIFDP and describe its implementation in the various sub-projects presently underway.

  2. The Advanced Linked Extended Reconnaissance & Targeting Technology Demonstration project

    NASA Astrophysics Data System (ADS)

    Edwards, Mark

    2008-04-01

    The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing many operational needs of the future Canadian Army's Surveillance and Reconnaissance forces. Using the surveillance system of the Coyote reconnaissance vehicle as an experimental platform, the ALERT TD project aims to significantly enhance situational awareness by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. The project is exploiting important advances made in computer processing capability, displays technology, digital communications, and sensor technology since the design of the original surveillance system. As the major research area within the project, concepts are discussed for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as from beyond line-of-sight systems such as mini-UAVs and unattended ground sensors. Video-rate image processing has been developed to assist the operator to detect poorly visible targets. As a second major area of research, automatic target cueing capabilities have been added to the system. These include scene change detection, automatic target detection and aided target recognition algorithms processing both IR and visible-band images to draw the operator's attention to possible targets. The merits of incorporating scene change detection algorithms are also discussed. In the area of multi-sensor data fusion, up to Joint Defence Labs level 2 has been demonstrated. The human factors engineering aspects of the user interface in this complex environment are presented, drawing upon multiple user group sessions with military surveillance system operators. The paper concludes with Lessons Learned from the project. The ALERT system has been used in a number of C4ISR

  3. TRICARE senior demonstration of military managed care--DOD. Notice of demonstration project.

    PubMed

    1998-07-17

    This notice is to advise interested parties of a demonstration project in which the Department of Defense (DoD) will provide health care services to Medicare-eligible military retirees in a managed care program, called TRICARE Senior, and receive reimbursement for such care from the Medicare Trust Fund. The program is authorized by section 1896 of the Social Security Act, amended by section 4015 of the Balanced Budget Act of 1997 (P.L. 105-33). The statue authorizes DoD and the Department of Health and Human Services (HHS) to conduct at six sites during January 1998 through December 2000, a three-year demonstration under which dual-eligible beneficiaries will be offered enrollment in a DoD-operated managed care plan, called TRICARE Senior Prime. The legislation also authorizes Medicare HMOs to make payments to DoD for care provided to HMO enrollees by military treatment facilities (MTFs) participating in the demonstration. This part of the demonstration, to be called Medicare Partners, will allow DoD to enter into contracts with Medicare HMOs to provide specialty and impatient care to dual-eligible beneficiaries currently provided on a space-available basis. Additional legal authority pertinent to this demonstration project is 10 U.S.C. section 1092. Under TRICARE Senior Prime, Medicare-eligible military retirees who enroll in the program will be assigned primary care manager (PCMs) at the MTF. Enrollees will be referred to specialty care providers at the MTF and to participating members of the existing TRICARE Prime network. TRICARE Senior Prime enrollees will be afforded the same priority access to MTF care as military retiree and retiree family member enrollees in TRICARE Prime. DoD will receive reimbursement from HCFA on a capitated basis at a rate which is 95 percent of the rate HCFA currently pays to Medicare-risk HMOs, less costs such as capital and graduate medical education, disproportionate share hospital payments, and some capital costs, which are

  4. Ultra Low Sulfur Home Heating Oil Demonstration Project

    SciTech Connect

    Batey, John E.; McDonald, Roger

    2015-09-30

    This Ultra Low Sulfur (ULS) Home Heating Oil Demonstration Project was funded by the New York State Energy Research and Development Authority (NYSERDA) and has successfully quantified the environmental and economic benefits of switching to ULS (15 PPM sulfur) heating oil. It advances a prior field study of Low Sulfur (500 ppm sulfur) heating oil funded by NYSERDA and laboratory research conducted by Brookhaven National Laboratory (BNL) and Canadian researchers. The sulfur oxide and particulate matter (PM) emissions are greatly reduced as are boiler cleaning costs through extending cleaning intervals. Both the sulfur oxide and PM emission rates are directly related to the fuel oil sulfur content. The sulfur oxide and PM emission rates approach near-zero levels by switching heating equipment to ULS fuel oil, and these emissions become comparable to heating equipment fired by natural gas. This demonstration project included an in-depth review and analysis of service records for both the ULS and control groups to determine any difference in the service needs for the two groups. The detailed service records for both groups were collected and analyzed and the results were entered into two spreadsheets that enabled a quantitative side-by-side comparison of equipment service for the entire duration of the ULS test project. The service frequency for the ULS and control group were very similar and did indicate increased service frequency for the ULS group. In fact, the service frequency with the ULS group was slightly less (7.5 percent) than the control group. The only exception was that three burner fuel pump required replacement for the ULS group and none were required for the control group.

  5. Demonstration of Innovative Applications of Technology for the CT-121 FGD Process. Project Performance Summary, Clean Coal Technology Demonstration Project

    SciTech Connect

    None, None

    2002-08-01

    This project is part of the U.S. Department of Energy's (DOE) Clean Coal Technology Demonstration Program (CCTDP) established to address energy and environmental concerns related to coal use. DOE sought cost-shared partnerships with industry through five nationally competed solicitations to accelerate commercialization of the most promising advanced coal-based power generation and pollution control technologies. The CCTDP, valued at over five billion dollars, has significantly leveraged federal funding by forging effective partnerships founded on sound principles. For every federal dollar invested, CCTDP participants have invested two dollars. These participants include utilities, technology developers, state governments, and research organizations. The project presented here was one of sixteen selected from 55 proposals submitted in 1988 and 1989 in response to the CCTDP second solicitation.

  6. AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis

    SciTech Connect

    Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

    2014-02-01

    This report contributes initial findings from an analysis of significant aspects of the gridSMART® Real-Time Pricing (RTP) – Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

  7. Qualitative assessment of agritourism safety guidelines: a demonstration project.

    PubMed

    Tutor-Marcom, Robin; Greer, Annette; Clay, Maria; Ellis, Tammy; Thompson, Tami; Adam-Samura, Esther Seisay

    2013-01-01

    In 2007, the National Children's Center for Rural and Agricultural Health and Safety (NCCRAHS) published Agritourism Health and Safety Guidelines for Children to provide helpful recommendations for protecting the health and safety of children visiting agritourism farms. Supplement A: Policies and Procedures Guide and Supplement B: Worksite Guide were subsequently published in 2009 and provided agritourism farms with checklists to use in reviewing, planning, and implementing their own health and safety practices. In order to better understand what would be required of a farm wishing to implement the guidelines using Supplements A and B, the North Carolina Agromedicine Institute conducted a single-family farm demonstration project with support from the NCCRAHS. The aims of the project were to (1) determine child health and safety risks associated with an existing agritourism farm; (2) determine the cost of making improvements necessary to reduce risks; and (3) use project findings to motivate other agritourism farms, Cooperative Extension agents, and agritourism insurers to adopt or recommend Agritourism Health and Safety Guidelines for Children for their own farms or farms with which they work. At the conclusion of the study, the target farm was in compliance with an average of 86.9% of items in Supplements A and B. Furthermore, 89% of individuals self-identifying as farmers or farm workers and 100% of Cooperative Extension agents and agritourism insurers attending an end-of-project workshop indicated their intent to adopt or recommend Agritourism Health and Safety Guidelines for Children for their own farms or farms with which they work. PMID:23540301

  8. LIFAC sorbent injection desulfurization demonstration project. Quarterly report No. 4, July--September 1991

    SciTech Connect

    Not Available

    1992-03-06

    In December 1990, the US Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled ``LIFAC Sorbent Injection Desulfurization Demonstration Project.`` The host site for this $17 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75--85% of the sulfur dioxide (SO{sub 2}) in the flue gas. In this report, progress for the period July--September 1991 is covered.

  9. Strengthening global health security capacity--Vietnam demonstration project, 2013.

    PubMed

    Tran, Phu Dac; Vu, Long Ngoc; Nguyen, Hien Tran; Phan, Lan Trong; Lowe, Wayne; McConnell, Michelle S; Iademarco, Michael F; Partridge, Jeffrey M; Kile, James C; Do, Trang; Nadol, Patrick J; Bui, Hien; Vu, Diep; Bond, Kyle; Nelson, David B; Anderson, Lauren; Hunt, Kenneth V; Smith, Nicole; Giannone, Paul; Klena, John; Beauvais, Denise; Becknell, Kristi; Tappero, Jordan W; Dowell, Scott F; Rzeszotarski, Peter; Chu, May; Kinkade, Carl

    2014-01-31

    Over the past decade, Vietnam has successfully responded to global health security (GHS) challenges, including domestic elimination of severe acute respiratory syndrome (SARS) and rapid public health responses to human infections with influenza A(H5N1) virus. However, new threats such as Middle East respiratory syndrome coronavirus (MERS-CoV) and influenza A(H7N9) present continued challenges, reinforcing the need to improve the global capacity to prevent, detect, and respond to public health threats. In June 2012, Vietnam, along with many other nations, obtained a 2-year extension for meeting core surveillance and response requirements of the 2005 International Health Regulations (IHR). During March-September 2013, CDC and the Vietnamese Ministry of Health (MoH) collaborated on a GHS demonstration project to improve public health emergency detection and response capacity. The project aimed to demonstrate, in a short period, that enhancements to Vietnam's health system in surveillance and early detection of and response to diseases and outbreaks could contribute to meeting the IHR core capacities, consistent with the Asia Pacific Strategy for Emerging Diseases. Work focused on enhancements to three interrelated priority areas and included achievements in 1) establishing an emergency operations center (EOC) at the General Department of Preventive Medicine with training of personnel for public health emergency management; 2) improving the nationwide laboratory system, including enhanced testing capability for several priority pathogens (i.e., those in Vietnam most likely to contribute to public health emergencies of international concern); and 3) creating an emergency response information systems platform, including a demonstration of real-time reporting capability. Lessons learned included awareness that integrated functions within the health system for GHS require careful planning, stakeholder buy-in, and intradepartmental and interdepartmental coordination and

  10. The Interdisciplinary Generalist Curriculum Project: A National Medical School Demonstration Project.

    ERIC Educational Resources Information Center

    Kahn, Norman B., Jr.; And Others

    1995-01-01

    The Interdisciplinary Generalist Curriculum Project was developed to encourage schools of medicine and colleges of osteopathic medicine to implement interdisciplinary generalist curricula in the preclinical years. Five sites were competitively established as demonstration projects, and rigorous attention to creating and maintaining an…

  11. The Social Security Administration's Youth Transition Demonstration Projects: Implementation Lessons from the Original Projects

    ERIC Educational Resources Information Center

    Martinez, John; Fraker, Thomas; Manno, Michelle; Baird, Peter; Mamun, Arif; O'Day, Bonnie; Rangarajan, Anu; Wittenburg, David

    2010-01-01

    This report focuses on the seven original Youth Transition Demonstration (YTD) projects selected for funding in 2003. Three of the original seven projects were selected for a national random assignment evaluation in 2005; however, this report only focuses on program operations prior to joining the random assignment evaluation for the three…

  12. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    EPA Science Inventory

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  13. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are special experimental demonstration projects and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  14. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are special experimental demonstration projects and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  15. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are special experimental demonstration projects and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  16. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are special experimental demonstration projects and teacher training projects? 461.33 Section 461.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  17. A Work Specific Curriculum Project. Special 353 Demonstration Project in Adult Education.

    ERIC Educational Resources Information Center

    Smith, Paula S.

    A demonstration project was conducted in Alabama to create a basic skills workplace curriculum that would assist a local corporation in improving work force productivity. During the 3-year project, a job-specific curriculum was written for Russell Corporation's Skills Training at Russell (STAR) program. The curriculum covered four topics: safety,…

  18. Northwest Open Automated Demand Response Technology Demonstration Project

    SciTech Connect

    Kiliccote, Sila; Piette, Mary Ann; Dudley, Junqiao

    2010-03-17

    The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides

  19. Demonstration of KHILS two-color IR projection capability

    NASA Astrophysics Data System (ADS)

    Jones, Lawrence E.; Coker, Jason S.; Garbo, Dennis L.; Olson, Eric M.; Murrer, Robert Lee, Jr.; Bergin, Thomas P.; Goldsmith, George C., II; Crow, Dennis R.; Guertin, Andrew W.; Dougherty, Michael; Marler, Thomas M.; Timms, Virgil G.

    1998-07-01

    For more than a decade, there has been considerable discussion about using different IR bands for the detection of low contrast military targets. Theory predicts that a target can have little to no contrast against the background in one IR band while having a discernible signature in another IR band. A significant amount of effort has been invested towards establishing hardware that is capable of simultaneously imaging in two IR bands to take advantage of this phenomenon. Focal plane arrays (FPA) are starting to materialize with this simultaneous two-color imaging capability. The Kinetic Kill Vehicle Hardware-in-the-loop Simulator (KHILS) team of the Air Force Research Laboratory and the Guided Weapons Evaluation Facility (GWEF), both at Eglin AFB, FL, have spent the last 10 years developing the ability to project dynamic IR scenes to imaging IR seekers. Through the Wideband Infrared Scene Projector (WISP) program, the capability to project two simultaneous IR scenes to a dual color seeker has been established at KHILS. WISP utilizes resistor arrays to produce the IR energy. Resistor arrays are not ideal blackbodies. The projection of two IR colors with resistor arrays, therefore, requires two optically coupled arrays. This paper documents the first demonstration of two-color simultaneous projection at KHILS. Agema cameras were used for the measurements. The Agema's HgCdTe detector has responsivity from 4 to 14 microns. A blackbody and two IR filters (MWIR equals 4.2 t 7.4 microns, LWIR equals 7.7 to 13 microns) were used to calibrate the Agema in two bands. Each filter was placed in front of the blackbody one at a time, and the temperature of the blackbody was stepped up in incremental amounts. The output counts from the Agema were recorded at each temperature. This calibration process established the radiance to Agema output count curves for the two bands. The WISP optical system utilizes a dichroic beam combiner to optically couple the two resistor arrays. The

  20. Project Integration Architecture: A Practical Demonstration of Information Propagation

    NASA Technical Reports Server (NTRS)

    Jones, William Henry

    2005-01-01

    One of the goals of the Project Integration Architecture (PIA) effort is to provide the ability to propagate information between disparate applications. With this ability, applications may then be formed into an application graph constituting a super-application. Such a super-application would then provide all of the analysis appropriate to a given technical system. This paper reports on a small demonstration of this concept in which a Computer Aided Design (CAD) application was connected to an inlet analysis code and geometry information automatically propagated from one to the other. The majority of the work reported involved not the technology of information propagation, but rather the conversion of propagated information into a form usable by the receiving application.

  1. Electric G-Van demonstration and commercial assessment project

    SciTech Connect

    Braga, B.D. )

    1992-12-01

    The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

  2. Functional description of the West Valley Demonstration Project Vitrification Facility

    SciTech Connect

    Borisch, R.R.; McMahon, C.L.

    1990-07-01

    The primary objective of the West Valley Demonstration Project (WVDP) is the solidification of approximately 2.1 million liters (560,000 gallons) of high-level radioactive waste (HLW) which resulted from the operation of a nuclear fuel reprocessing plant. Since the original plant was not built to accommodate the processing of waste beyond storage in underground tanks, HLW solidification by vitrification presented numerous engineering challenges. Existing facilities required redesign and conversion to meet their new purpose. Vitrification technology and systems needed to be created and then tested. Equipment modifications, identified from cold test results, were incorporated into the final equipment configuration to be used for radioactive (hot) operations. Cold operations have defined the correct sequence and optimal functioning of the equipment to be used for vitrification and have verified the process by which waste will be solidified into borosilicate glass.

  3. Uranium soils integrated demonstration: Soil characterization project report

    SciTech Connect

    Cunnane, J.C.; Gill, V.R.; Lee, S.Y.; Morris, D.E.; Nickelson, M.D.; Perry, D.L.; Tidwell, V.C.

    1993-08-01

    An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP.

  4. City of Chula Vista hydrogen fuel cell bus demonstration project

    SciTech Connect

    Gustafson, B.; Bamberger, B.

    1996-10-01

    Hydrogen as an energy carrier and fuel has potential for various uses including electricity, commercial, residential, transportation, and industrial. It is an energy carrier that can be produced from a variety of primary sources and potentially can accomplish these various uses while significantly reducing pollution by substituting for or reducing the use of fossil fuels. One of the most immediate and potentially viable roles for hydrogen as an energy carrier will be its use as a transportation fuel, especially in densely populated urban areas where automotive emissions contribute significantly to air pollution. The Department of Energy`s commitment to research and development of hydrogen as an alternative fuel, and California`s Zero Emission Vehicle (ZEV) requirements, both provide the impetus and favorable circumstance for demonstrating hydrogen as a transportation fuel on an urban bus system. The purpose of this project is to demonstrate the feasibility of using solid polymer fuel cells in a hydrogen-powered electric drive system for an urban transit bus application. Fuel cell buses use hydrogen fuel and oxygen from the air to produce electrical power with the only byproduct being pure water. Proton Exchange Membrane (PEM) fuel cells are proposed for this project. Current evidence suggests that fuel cells, which rely on hydrogen and a process known as proton exchange to generate their power, appear to have an infinite life span. All exhaust pollution is completely eliminated, resulting in a Zero Emission Vehicle (ZEV). An urban bus system offers the potential for developing a market for the production of hydrogen propulsion technology due to extensive vehicular use in densely populated areas experiencing pollution from numerous sources, and because the central garaging facilities or the bus system facilitates fueling and maintenance functions.

  5. The advanced linked extended reconnaissance and targeting technology demonstration project

    NASA Astrophysics Data System (ADS)

    Cruickshank, James; de Villers, Yves; Maheux, Jean; Edwards, Mark; Gains, David; Rea, Terry; Banbury, Simon; Gauthier, Michelle

    2007-06-01

    The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing key operational needs of the future Canadian Army's Surveillance and Reconnaissance forces by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. We discuss concepts for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as beyond line-of-sight systems such as a mini-UAV and unattended ground sensors. The authors address technical issues associated with the use of fully digital IR and day video cameras and discuss video-rate image processing developed to assist the operator to recognize poorly visible targets. Automatic target detection and recognition algorithms processing both IR and visible-band images have been investigated to draw the operator's attention to possible targets. The machine generated information display requirements are presented with the human factors engineering aspects of the user interface in this complex environment, with a view to establishing user trust in the automation. The paper concludes with a summary of achievements to date and steps to project completion.

  6. Bethlehem Steel Corporation Blast Furnace Granulated Coal Injection Demonstration Project

    SciTech Connect

    Not Available

    1993-05-01

    Construction of the proposed BFGCI system is not expected to have significant impacts on air quality, noise, and land use at the Burns Harbor Plant area. Operation of the proposed BFGCI system is not expected to have significant impacts on the environment at the Burns Harbor Plant area. An increase of approximately 30 tons/yr for NO{sub x} and approximately 13 tons/yr for particulate matter (from the coal storage area) is expected. These emissions are within the currently permitted levels. Carbon dioxide emissions, which are unregulated, would increase by about 220,000 tons/yr at the Burns Harbor Plant. Water withdrawn and returned to Lake Michigan would increase by 1.3 million gal/d (0.4 percent of existing permitted discharge) for non-contact cooling water. No protected species, floodplains, wetlands, or cultural resources would be affected by operation of the proposed facility. Small economic benefits would occur from the creation of 5 or 6 permanent new jobs during the operation of the proposed demonstration project and subsequent commercial operation. Under the No Action Alternative, the proposed project would not receive cost-shared funding support from DOE.

  7. The PMI local site demonstration project: lessons in technical assistance.

    PubMed

    Strand, J; Rosenbaum, J; Hanlon, E; Jimerson, A

    2000-03-01

    This paper presents the lessons that were learned in technical assistance during the Preventive Marketing Initiative local site demonstration project in the US. The program has been ongoing for 5 years, with social marketers from the Academy for Educational Development and Porter Novelli using social marketing and behavioral science principles to develop HIV prevention programs for and with local teens. With the success of the program, community-based prevention programs are increasingly being requested since better outcomes resulted from a few dollars of investment. Likewise, funders and prevention researchers were challenged to transfer state-of-the-art prevention technologies for communities to apply it readily. The success achieved by the project, however, provides important lessons that would save time and money for future community-based Prevention Marketing efforts. Among the lessons were the need to seek out or establish conditions in the community that are conducive to success, as well as the need to offer technical assistance that would mobilize communities in developing more effective Prevention Marketing programs. PMID:12349591

  8. New Mexico State University Campus geothermal demonstration project

    SciTech Connect

    Cuniff, R.A.; Fisher, K.P.; Chintawongvanich, P.

    1984-04-01

    This report presents the design, construction highlights, and performance of the New Mexico State University Campus Geothermal Demonstration Project at Las Cruces, New Mexico. Construction started in July 1981, first system use was January 1982, and the system was dedicated on April 21, 1982. Included herein are summary observations after two years of use. The geothermal hot water from New Mexico State University wells is used to heat potable water, which in turn provides 83 percent of the domestic hot water on the New Mexico State University campus, as well as space heat to two buildings, and for two heated swimming pools. The original system is providing service to 30 total buildings, with two additional buildings (150,000 square feet) in process of geothermal conversion.) The system overall performance has been excellent, except for geothermal well pump problems. In terms of operating efficiency, the system has exceeded the design parameters. In spite of abnormally high costs for well and pump repairs, the system has shown a positive cost avoidance of more than $118,000 for the first year of operation. For the first two full years of operation, the system has produced a net positive cost avoidance of more than $200,000. Payback on the total investment of $1,670,000 is projected to be 6 to 10 years, depending on the future prices of natural gas and electricity.

  9. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment

    SciTech Connect

    National Energy Technology Laboratory

    2001-08-31

    The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO{sub 2} emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO{sub 2} removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge.

  10. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    SciTech Connect

    Gasper, John R.; Veselka, Thomas D.; Mahalik, Matthew R.; Hayse, John W.; Saha, Samrat; Wigmosta, Mark S.; Voisin, Nathalie; Rakowski, Cynthia; Coleman, Andre; Lowry, Thomas S.

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  11. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    SciTech Connect

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  12. The Nucla Circulating Fluidized-Bed Demonstration Project: A U.S. DOE post-project assessment

    SciTech Connect

    1995-06-01

    This report is a post-project assessment of the Nucla Circulating Fluidized-Bed (CFB) Demonstration Project, the second project to be completed in the DOE Clean Coal Technology Program. Nucla was the first successful utility repowering project in the US, increasing the capacity of the original power station from 36 MW(e) to 110 MW(e) and extending its life by 30 years. In the CFB boiler, combustion and desulfurization both take place in the fluidized bed. Calcium in the sorbent captures sulfur dioxide and the relatively low combustion temperatures limit NOx formation. Hot cyclones separate the larger particles from the gas and recirculates them to the lower zones of the combustion chambers. This continuous circulation of coal char and sorbent particles is the novel feature of CFB technology. This demonstration project significantly advanced the environmental, operational, and economic potential of atmospheric CFB technology, precipitating a large number of orders for atmospheric CFB equipment. By 1994, more than 200 atmospheric CFB boilers have been constructed worldwide. Although at least six CFB units have been operated, the Nucla project`s CFB database continues to be an important and unique resource for the design of yet larger atmospheric CFB systems. The post-project assessment report is an independent DOE appraisal of the success a completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology as well as an analysis of the commercial market.

  13. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethylether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operation in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work

  14. Milliken Clean Coal Technology Demonstration Project. Environmental monitoring report, July--September 1996

    SciTech Connect

    1998-05-01

    New York State Electric and Gas Corporation (NYSEG) has installed and is presently operating a high-efficiency flue gas desulfurization (FGD) system to demonstrate innovative emissions control technology and comply with the Clean Air Act Amendments of 1990. The host facility for this demonstration project is NYSEG`s Milliken Station, in the Town of Lansing, New York. The primary objective of this project is to demonstrate a retrofit of energy-efficient SO{sub 2} and NO{sub x} control systems with minimal impact on overall plant efficiency. The demonstration project has added a forced oxidation, formic acid-enhanced wet limestone FGD system, which is expected to reduce SO{sub 2} emissions by at least 90 percent. NYSEG also made combustion modifications to each boiler and plans to demonstrate selective non-catalytic reduction (SNCR) technology on unit 1, which will reduce NO{sub x} emissions. Goals of the proposed demonstration include up to 98 percent SO{sub 2} removal efficiency while burning high-sulfur coal, 30 percent NO{sub x} reductions through combustion modifications, additional NO{sub x} reductions using SNCR technology, production of marketable commercial-grade gypsum and calcium chloride by-products to minimize solid waste disposal, and zero wastewater discharge.

  15. Community ownership and program continuation following a health demonstration project.

    PubMed

    Bracht, N; Finnegan, J R; Rissel, C; Weisbrod, R; Gleason, J; Corbett, J; Veblen-Mortenson, S

    1994-06-01

    Community ownership and maintenance of heart health programs was a major study goal of the Minnesota Heart Health Program (MHHP), a community-based National Heart, Blood and Lung Institute (NIH)-funded demonstration project. A partnership between the University of Minnesota and three Upper Midwest intervention communities was initiated in 1981. Local citizen boards were instrumental in planning, implementing and incorporating programs. Through an 8 year process of community organization, training and volunteer involvement, MHHP educational program responsibility was transferred to existing community-based groups and organizations. In 1989, when federal funding was withdrawn, 70% of all heart health intervention programs initiated by MHHP were being continued by local sponsors and supported by local funds. By 1992, maintenance of programs had decreased to an average 60%. Differential results of program incorporation among the three intervention communities are presented including findings on community sectors that most frequently sponsored programs. Factors that facilitate or impede local ownership are discussed. Research on longer-term maintenance of heart health programs in the three communities continues. PMID:10150448

  16. Denver Potable Water Reuse Demonstration Project: comprehensive chronic rat study.

    PubMed

    Condie, L W; Lauer, W C; Wolfe, G W; Czeh, E T; Burns, J M

    1994-11-01

    The health effects testing program for the Denver Water Department's Potable Water Reuse Demonstration Project was designed to evaluate the relative health effects of highly treated reclaimed water derived from secondary wastewater in comparison with Denver's present high-quality drinking water. The 1 x 10(6) gal/day treatment plant provided 500-fold concentrates of water that had been treated by multiple processes to remove microbial and chemical contaminants. Fischer 344 rats were exposed to the complex mixture solutions for up to 2 yr to evaluate chronic toxicity and oncogenicity effects. The following parameters were evaluated: clinical observations, survival rate, growth, food and water consumption, haematology, clinical chemistry, urinalysis, organ weights, gross autopsy and histopathological examination of all lesions, major tissues and organs. Clinical pathology, gross pathology, and microscopic pathology conducted at wk 26 and 65 and at the end of the study did not reveal any findings that could be considered to be treatment related. Administration of drinking water concentrates at up to 500 times the original concentration in the original water samples to F344 rats for up to 104 wk did not result in any overt toxicological or carcinogenic effects. PMID:7959456

  17. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    SciTech Connect

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  18. Town of Edinburg landfill reclamation demonstration project. Final report

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  19. The Ambulatory Care Medical Audit Demonstration Project. Research design.

    PubMed

    Palmer, R H; Hargraves, J L

    1996-09-01

    The authors describe the design of and statistical analyses involved in the Ambulatory Care Medical Audit Demonstration Project, which tested feasibility, cost, and effectiveness of cycles that met quality assurance requirements in eight pediatric and eight general medicine group practices at four teaching hospitals and six health centers. The authors used a concurrent crossover design using randomized cycles of quality assurance so that a practice was a control site for one guideline and an experimental site for another. For 12 months before and 18 months during and after quality assurance experimental interventions, the authors measured practitioner conformance to review criteria for patient-care guidelines believed to improve outcomes, including four internal medicine patient-care guidelines (ie, follow-up of low hematocrit, cancer screening for women, follow-up of high serum glucose, and monitoring of patients treated with digoxin) and four pediatric patient-care guidelines (ie, follow-up of positive urine cultures, screening for disease and immunizing infants, management of acute gastroenteritis, and management of acute ear infection). The authors distinguished review criteria whose performance depended on personal efforts of practitioners from those that concerned performance dependent on the practice's system for reporting test results and calling patients to return for care. PMID:8792786

  20. The ACT{sup 2} project: Demonstration of maximum energy efficiency in real buildings

    SciTech Connect

    Crawley, D.B.; Krieg, B.L.

    1991-11-01

    A large US utility recently began a project to determine whether the use of new energy-efficient end-use technologies and systems would economically achieve substantial energy savings (perhaps as high as 75% over current practice). Using a field-based demonstration approach, the Advanced Customer Technology Test (ACT{sup 2}) for Maximum Energy Efficiency is providing information on the maximum energy savings possible when integrated packages of new high-efficiency end-use technologies are incorporated into commercial and residential buildings and industrial and agricultural processes. This paper details the underlying rationale, approach, results to date, and future plans for ACT{sup 2}. The ultimate goal is energy efficiency (doing more with less energy) rather than energy conservation (freezing in the dark). In this paper, we first explain why a major United States utility is committed to pursuing demand-side management so aggressively. Next, we discuss the approach the utility chose for conducting the ACT{sup 2} project. We then review results obtained to date from the project`s pilot demonstration site. Last, we describe other related demonstration projects being proposed by the utility.

  1. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the

  2. Environmental Assessment for the Accelerated Tank Closure Demonstration Project

    SciTech Connect

    N /A

    2003-06-16

    The U.S. Department of Energy's (DOE) Office of River Protection (ORP) needs to collect engineering and technical information on (1) the physical response and behavior of a Phase I grout fill in an actual tank, (2) field deployment of grout production equipment and (3) the conduct of component closure activities for single-shell tank (SST) 241-C-106 (C-106). Activities associated with this Accelerated Tank Closure Demonstration (ATCD) project include placement of grout in C-106 following retrieval, and associated component closure activities. The activities will provide information that will be used in determining future closure actions for the remaining SSTs and tank farms at the Hanford Site. This information may also support preparation of the Environmental Impact Statement (EIS) for Retrieval, Treatment, and Disposal of Tank Waste and Closure of Single-Shell Tanks at the Hanford Site, Richland, Washington (Tank Closure EIS). Information will be obtained from the various activities associated with the component closure activities for C-106 located in the 241-C tank farm (C tank farm) under the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and the Hanford Federal Facility Agreement and Consent Order (HFFACO) (Ecology et al. 1989). The impacts of retrieving waste from C-106 are bounded by the analysis in the Tank Waste Remediation System (TWRS) EIS (DOE/EIS-0189), hereinafter referred to as the TWRS EIS. DOE has conducted and continues to conduct retrieval activities at C-106 in preparation for the ATCD Project. For major federal actions significantly affecting the quality of the human environment, the ''National Environmental Policy Act of 1969'' (NEPA) requires that federal agencies evaluate the environmental effects of their proposed and alternative actions before making decisions to take action. The President's Council on Environmental Quality (CEQ) has developed regulations for implementing NEPA. These regulations are found in Title 40 of the Code

  3. Project Genesis: Mars in situ propellant technology demonstrator mission

    NASA Technical Reports Server (NTRS)

    Acosta, Francisco Garcia; Anderson, Scott; Andrews, Jason; Deger, Matt; Hedman, Matt; Kipp, Jared; Kobayashi, Takahisa; Marcelo, Mohrli; Mark, Karen; Matheson, Mark

    1994-01-01

    Project Genesis is a low cost, near-term, unmanned Mars mission, whose primary purpose is to demonstrate in situ resource utilization (ISRU) technology. The essence of the mission is to use indigenously produced fuel and oxidizer to propel a ballistic hopper. The Mars Landing Vehicle/Hopper (MLVH) has an Earth launch mass of 625 kg and is launched aboard a Delta 117925 launch vehicle into a conjunction class transfer orbit to Mars. Upon reaching its target, the vehicle performs an aerocapture maneuver and enters an elliptical orbit about Mars. Equipped with a ground penetrating radar, the MLVH searches for subsurface water ice deposits while in orbit for several weeks. A deorbit burn is then performed to bring the MLVH into the Martian atmosphere for landing. Following aerobraking and parachute deployment, the vehicle retrofires to a soft landing on Mars. Once on the surface, the MLVH begins to acquire scientific data and to manufacture methane and oxygen via the Sabatier process. This results in a fuel-rich O2/CH4 mass ratio of 2, which yields a sufficiently high specific impulse (335 sec) that no additional oxygen need be manufactured, thus greatly simplifying the design of the propellant production plant. During a period of 153 days the MLVH produces and stores enough fuel and oxidizer to make a 30 km ballistic hop to a different site of scientific interest. At this new location the MLVH resumes collecting surface and atmospheric data with the onboard instrumentation. Thus, the MLVH is able to provide a wealth of scientific data which would otherwise require two separate missions or separate vehicles, while proving a new and valuable technology that will facilitate future unmanned and manned exploration of Mars. Total mission cost, including the Delta launch vehicle, is estimated to be $200 million.

  4. Gas Dynamic Spray Technology Demonstration Project Management. Joint Test Report

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2011-01-01

    The standard practice for protecting metallic substrates in atmospheric environments is the use of an applied coating system. Current coating systems used across AFSPC and NASA contain volatile organic compounds (VOCs) and hazardous air pollutants (HAPs). These coatings are sUbject to environmental regulations at the Federal and State levels that limit their usage. In addition, these coatings often cannot withstand the high temperatures and exhaust that may be experienced by Air Force Space Command (AFSPC) and NASA structures. In response to these concerns, AFSPC and NASA have approved the use of thermal spray coatings (TSCs). Thermal spray coatings are extremely durable and environmentally friendly coating alternatives, but utilize large cumbersome equipment for application that make the coatings difficult and time consuming to repair. Other concerns include difficulties coating complex geometries and the cost of equipment, training, and materials. Gas Dynamic Spray (GOS) technology (also known as Cold Spray) was evaluated as a smaller, more maneuverable repair method as well as for areas where thermal spray techniques are not as effective. The technology can result in reduced maintenance and thus reduced hazardous materials/wastes associated with current processes. Thermal spray and GOS coatings also have no VOCs and are environmentally preferable coatings. The primary objective of this effort was to demonstrate GDS technology as a repair method for TSCs. The aim was that successful completion of this project would result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations to improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

  5. A Work Specific Curriculum Project. Special 353 Demonstration Project in Adult Education.

    ERIC Educational Resources Information Center

    Auburn Univ., AL. Dept. of Vocational and Adult Education.

    This document contains samples of work specific curricula for the basic level (I) and advanced level (II) of the safety section of the Auburn University (Alabama) Demonstration project in adult education. The samples consist of instructor manuals and student books. Content of each instructor manual--one for level I and another for level…

  6. 34 CFR 377.1 - What is the Demonstration Projects to Increase Client Choice Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Demonstration Projects to Increase Client... PROJECTS TO INCREASE CLIENT CHOICE PROGRAM General § 377.1 What is the Demonstration Projects to Increase Client Choice Program? The Demonstration Projects to Increase Client Choice Program is designed...

  7. HARD CHROME POLLUTION PREVENTION DEMONSTRATION PROJECT - INTERIM REPORT

    EPA Science Inventory

    In the project, five chromium emission prevention/control devices were tested tha cover the spectrum of prevention/control techniques currently in use in small- and large-size hard chromium electroplating job shops. The Project results show that some of the tested devices had ch...

  8. Eldercare Volunteer Corps Demonstration, A "Project Care" Initiative. Final Report.

    ERIC Educational Resources Information Center

    Kentucky State Dept. for Social Services, Frankfort.

    The goal for this project was to recognize the volunteers at the beginning of the project and to focus on a program to increase the utilization of volunteers in essential service delivery to at-risk persons in the Big Sandy region of eastern Kentucky. A diverse committee made up of business, education, civil leaders, service providers, and…

  9. Northwestern Pennsylvania Cooperative Demonstration Project (High Technology). Process Manual.

    ERIC Educational Resources Information Center

    Indiana Univ. of Pennsylvania. Center for Vocational Personnel Preparation.

    This process manual explains the procedures followed by a project that provided training for employees of manufacturing industries. It also focuses on the project's attainment of two other objectives: (1) helping industry in the target area become more competitive with foreign rivals; and (2) building a network between industry and education. A…

  10. Blast Furnace Granulated Coal Injection System Demonstration Project public design report. Topical report

    SciTech Connect

    1995-03-01

    The public design report describes the Blast Furnace Granulated Coal Injection (BFGCI) project under construction at Bethlehem Steel Corporation`s (BSC) Burns Harbor, Indiana, plant. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. The project is the first installation in the United States for the British Steel technology using granular coal in blast furnaces. The objective is to demonstrate that granular coal is an economic and reliable fuel which can successfully be applied to large North American blast furnaces. These include: coal grind size, coal injection rate, coal source (type) and blast furnace conversion method. To achieve the program objectives, the demonstration project is divided into the following three Phases: Phase I-Design; Phase II-Procurement & Construction; and Phase III-Operation. Preliminary design (Phase I) began in 1991 with detailed design commencing in April 1993. Construction at Burns Harbor (Phase II) began August 1993. Construction is expected to be complete in the first quarter of 1995 which will be followed by a demonstration test program (Phase III).

  11. The ACT sup 2 project: Demonstration of maximum energy efficiency in real buildings

    SciTech Connect

    Crawley, D.B. ); Krieg, B.L. )

    1991-11-01

    A large US utility recently began a project to determine whether the use of new energy-efficient end-use technologies and systems would economically achieve substantial energy savings (perhaps as high as 75% over current practice). Using a field-based demonstration approach, the Advanced Customer Technology Test (ACT{sup 2}) for Maximum Energy Efficiency is providing information on the maximum energy savings possible when integrated packages of new high-efficiency end-use technologies are incorporated into commercial and residential buildings and industrial and agricultural processes. This paper details the underlying rationale, approach, results to date, and future plans for ACT{sup 2}. The ultimate goal is energy efficiency (doing more with less energy) rather than energy conservation (freezing in the dark). In this paper, we first explain why a major United States utility is committed to pursuing demand-side management so aggressively. Next, we discuss the approach the utility chose for conducting the ACT{sup 2} project. We then review results obtained to date from the project's pilot demonstration site. Last, we describe other related demonstration projects being proposed by the utility.

  12. Northwest Open Automated Demand Response Technology Demonstration Project

    SciTech Connect

    Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann

    2009-08-01

    Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) performed a technology demonstration and evaluation for Bonneville Power Administration (BPA) in Seattle City Light's (SCL) service territory. This report summarizes the process and results of deploying open automated demand response (OpenADR) in Seattle area with winter morning peaking commercial buildings. The field tests were designed to evaluate the feasibility of deploying fully automated demand response (DR) in four to six sites in the winter and the savings from various building systems. The project started in November of 2008 and lasted 6 months. The methodology for the study included site recruitment, control strategy development, automation system deployment and enhancements, and evaluation of sites participation in DR test events. LBNL subcontracted McKinstry and Akuacom for this project. McKinstry assisted with recruitment, site survey collection, strategy development and overall participant and control vendor management. Akuacom established a new server and enhanced its operations to allow for scheduling winter morning day-of and day-ahead events. Each site signed a Memorandum of Agreement with SCL. SCL offered each site $3,000 for agreeing to participate in the study and an additional $1,000 for each event they participated. Each facility and their control vendor worked with LBNL and McKinstry to select and implement control strategies for DR and developed their automation based on the existing Internet connectivity and building control system. Once the DR strategies were programmed, McKinstry commissioned them before actual test events. McKinstry worked with LBNL to identify control points that can be archived at each facility. For each site LBNL collected meter data and trend logs from the energy management and control system. The communication system allowed the sites to receive day-ahead as well as day-of DR test event signals. Measurement of DR was

  13. Hot-gas filter testing with the transport reactor demonstration unit

    SciTech Connect

    Mann, M.D.; Swanson, M.L.; Ness, R.O.; Haley, J.S.

    1995-11-01

    The objectives of the hot-gas cleanup (HGC) work on the transport reactor demonstration unit (TRDU) located at the Energy & Environmental Research Center (EERC) is to demonstrate acceptable performance of hot-gas filter elements in a pilot-scale system prior to long-term demonstration tests. The primary focus of the experimental effort in the 2-year project will be the testing of hot-gas filter element performance (particulate collection efficiency, filter pressure differential, filter cleanability, and durability) as a function of temperature and filter face velocity during short-term operation (100-200 hours). This filter vessel will be utilized in combination with the TRDU to evaluate the performance of selected hot-gas filter elements under gasification operating conditions. This work will directly support the power systems development facility (PSDF) utilizing the M.W. Kellogg transport reactor located at Wilsonville, Alabama and, indirectly, the Foster Wheeler advanced pressurized fluid-bed combustor, also located at Wilsonville.

  14. EAST BAY WETLAND PROTECTION AND RESTORATION DEMONSTRATION PROJECT MX964238

    EPA Science Inventory

    This project represents the first in a series to protect the East Bay north shoreline from further erosion by installing rigid erosion-control structures. Additionally, intertidal marsh vegetation will be restored behind the breakwaters.

  15. Next Steps for the FCEV Learning Demonstration Project (Presentation)

    SciTech Connect

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-02-01

    This presentation summarizes project goals; vehicle and H2 station deployment status, critical performance compared to targets; highlights of latest vehicle and infrastructure analysis results and progress; learning demo next steps; highlights of partner activities and summary.

  16. Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) Systems Integration Strategy

    NASA Technical Reports Server (NTRS)

    Gill, Tracy; Merbitz, Jerad; Kennedy, Kriss; Tri, Terry; Toups, Larry; Howe, A. Scott

    2011-01-01

    The Habitat Demonstration Unit (HDU) project team constructed an analog prototype lunar surface laboratory called the Pressurized Excursion Module (PEM). The prototype unit subsystems were integrated in a short amount of time, utilizing a rapid prototyping approach that brought together over 20 habitation-related technologies from a variety of NASA centers. This paper describes the system integration strategies and lessons learned, that allowed the PEM to be brought from paper design to working field prototype using a multi-center team. The system integration process was based on a rapid prototyping approach. Tailored design review and test and integration processes facilitated that approach. The use of collaboration tools including electronic tools as well as documentation enabled a geographically distributed team take a paper concept to an operational prototype in approximately one year. One of the major tools used in the integration strategy was a coordinated effort to accurately model all the subsystems using computer aided design (CAD), so conflicts were identified before physical components came together. A deliberate effort was made following the deployment of the HDU PEM for field operations to collect lessons learned to facilitate process improvement and inform the design of future flight or analog versions of habitat systems. Significant items within those lessons learned were limitations with the CAD integration approach and the impact of shell design on flexibility of placing systems within the HDU shell.

  17. Demonstration of coal reburning for cyclone boiler NO{sub x} control. Final project report

    SciTech Connect

    Not Available

    1994-02-01

    As part of the US Department of Energy`s (DOE`s) Innovative Clean Coal Technology Program, under Round 2, a project for Full Scale Demonstration of Coal Reburning for Cyclone Boiler Nitrogen Oxide (NO{sub x},) Control was selected. DOE sponsored The Babcock & Wilcox (B&W) Company, with Wisconsin Power & Light (WP&L) as the host utility, to demonstrate coal reburning technology at WP&L`s 110 MW{sub c}, cyclone-fired Unit No.2 at the Nelson Dewey Generating Station in Cassville, Wisconsin. The coal reburning demonstration was justified based on two prior studies. An Electric Power Research Institute (EPRI) and B&W sponsored engineering feasibility study indicated that the majority of cyclone-equipped boilers could successfully apply reburning technology to reduce NO{sub x}, emissions by 50 to 70%. An EPRI/Gas Research Institute (GRI)/B&W pilot-scale evaluation substantiated this conclusion through pilot-scale testing in B&W`s 6 million Btu/hr Small Boiler Simulator. Three different reburning fuels, natural gas, No. 6 oil, and pulverized coal were tested. This work showed that coal as a reburning fuel performs nearly as well as gas/oil without deleterious effects of combustion efficiency. Coal was selected for a full scale demonstration since it is available to all cyclone units and represents the highest level of technical difficulty-in demonstrating the technology.

  18. The Mixed Waste Management Facility: A DOE technology demonstration project

    SciTech Connect

    Adamson, M.G.; Streit, R.D.

    1994-05-01

    The Mixed Waste Management Facility (MWMF) is a national demonstration test bed that will be used to evaluate, at pilot scale, emerging technologies for the effective treatment of low-level radioactive, organic mixed wastes. The treatment technologies will be selected from candidates of advanced processes that have been sufficiently demonstrated in laboratory and bench-scale tests, and most closely meet suitable criteria for demonstration. The primary and initial goal will be to demonstrate technologies that have the potential to effectively treat a selection of organic-based mixed waste streams, currently in storage within the DOE, that list incineration as the best demonstrated available technology (BDAT). In future operations, the facility may also be used to demonstrate technology that addresses a broader range of government, university, medical, and industry needs. The primary objective of the MWMF is to demonstrate integrated mixed-waste processing technologies. While primary treatment processes are an essential component of integrated treatment trains, they are only a part of a fully integrated demonstration.

  19. Educational Voucher Demonstration Archive: Project-Level Documentation.

    ERIC Educational Resources Information Center

    Leinwand (C.M.) Associates, Inc., Newton, MA.

    This report describes the Educational Voucher Demonstration, serves as a guide for its documentation, and offers an extensive bibliography. Part 1 gives background information and summarizes the implementation of the Alum Rock Demonstration based on a transitional voucher model and involving six public schools, each offering at least two distinct…

  20. LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly report No. 12, July--September 1993

    SciTech Connect

    Not Available

    1993-12-31

    In December 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO{sub 2}) in the flue gas. The host site for this $22 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The three project phases are: (1) Design; (2A) Long Lead Procurement; (2B) Construction; and (3) Operations. The design phase began on August 8, 1990 and was scheduled to last six months. Phase 2A, long lead procurement, overlaps the design phase and was expected to require about four months to complete. The construction phase was then to continue for another seven months, while the operations phase was scheduled to last about twenty-six months. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the twelfth Technical Progress Report covering the period July 1, 1993 through the end of September 1993. Due to the power plant`s planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

  1. Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)

    SciTech Connect

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-03-01

    Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  3. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    SciTech Connect

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  4. Fair Start for Children: Lessons Learned from Seven Demonstration Projects.

    ERIC Educational Resources Information Center

    Larner, Mary, Ed.; And Others

    In the early 1980s, the Ford Foundation launched a grants program called Child Survival/A Fair Start for Children (CS/FS) that addressed issues related to birth and infant health and development among families that were poor and underserved by traditional human services. This book reports on each of seven CS/FS projects, describing the concerns…

  5. Treating substance abuse in primary care: a demonstration project

    PubMed Central

    Ernst, Denise; Miller, William R.; Rollnick, Stephen

    2007-01-01

    Purpose The purpose of this project was to implement the delivery of a full range of substance abuse services in a primary care setting. Implementation and logistical issues including confidentiality and communication are discussed. The delivery of services, types of patients, and contextual and policy factors that influenced project implementation are described. Context Substance use disorders are associated with significant morbidity and mortality worldwide. Patients with alcohol/drug problems frequently present in primary care. Effective and brief treatments are available and recommended for primary care but infrequently implemented. Institutional and provider barriers to implementation have been identified. Data source Project documentation, data from the patient tracking system, and clinical case notes were used for description and analyses. Conclusion Addressing substance abuse problems in primary care is important. Behavioral health professionals with training in substance abuse can provide a range of services that are likely to enhance the quality and quantity of care available to patients. Although contextual factors needed to be addressed, integration of services was manageable and seemed acceptable to both providers and patients in this project. PMID:18043722

  6. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  7. IMPACT: An Early Intervention Demonstration Project. Abbreviated Version.

    ERIC Educational Resources Information Center

    Ungerleider, Steven; Caudill, Barry D.

    Project IMPACT is based on an innovative prevention/community intervention model designed to stem the use of drugs and alcohol in an Oregon school district. A total of 74 teachers, administrators, and community leaders participated in a training session which included didactic and experiential sessions informing participants about the nature and…

  8. Evaluation of the Basic Reading Demonstration Project, 1966-67.

    ERIC Educational Resources Information Center

    Rankin, Paul T., Jr.

    A study was conducted to determine the effectiveness of six approaches to beginning reading instruction (basal, linguistic, phonic, programed reading, i/t/a, and unifon) in schools serving educationally disadvantaged children and to determine the effectiveness of lay aides in project classrooms. Subjects were approximately 4,000 pupils in primary…

  9. SITE DEMONSTRATION OF THE TORONTO HARBOUR COMMISSIONERS SOIL RECYCLING PROJECT

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA), in cooperation with the Toronto Harbour Commissioners (THC), conducted a Superfund InnovativeTechnology Evaluation (SITE) demonstration of the THC Soil Recycle Treatment Train. The treatment train consists of three technologies op...

  10. TIDD PFBC Demonstration Project. Second quarterly report, 1994

    SciTech Connect

    1997-07-01

    Major activities during this period include: (1) The unit operated for 1529 hours on coal, bringing the grand total for coal fire through the end of the quarter to 7847 hours. (2) During the quarter, the Tidd Plant set a new record for its longest continuous run on coal; 1079 hours, surpassing its previous record of 740 hours set in June-July of 1992. (3) The unit availability for the first half of 1994 was 54.7%. (4) There were four gas turbine starts, eight bed preheater starts, and six operating periods on coal. (5) During this quarter, total gross generation was 71,115 MWH, the peak unit output for one hour was 59 MWH, and the coal consumption was 35,696 tons. (6) Fifteen performance tests have been conducted since the start of the fourth year of operation. Eleven of the tests were conducted during the record run during May and June. (7) Agreements were finalized with the DOE, Ohio Coal Development Office, and technology vendors for funding of the fourth year of operation of the plant.

  11. Industrial- and utility-scale coal-water fuel demonstration projects

    SciTech Connect

    Hathi, V.; Ramezan, M.; Winslow, J.

    1993-01-01

    Laboratory-, pilot-, and large-scale CWF combustion work has been performed primarily in Canada, China, Italy, Japan, Korea, Sweden, and the United States, and several projects are still active. Sponsors have included governments, utilities and their research arms, engine manufacturers, equipment suppliers, and other organizations in attempts to show that CWF is a viable alternative to premium fuels, both in cost and performance. The objective of this report is to present brief summaries of past and current industrial- and utility-scale CWF demonstrations in order to determine what lessons can be learned from these important, highly visible projects directed toward the production of steam and electricity. Particular emphasis is placed on identifying the CWF characteristics; boiler type, geometry, size, and location; length of the combustion tests; and the results concerning system performance, including emissions.

  12. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    NASA Technical Reports Server (NTRS)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  13. TREATMENT OF HIGHLY CONTAMINATED GROUNDWATER: A SITE DEMONSTRATION PROJECT

    EPA Science Inventory

    From 9-11/1994, the USEPA conducted a field demonstration of the remediation of highly contaminated groundwater at the Mascolite Superfund site located in Millville, NJ. Besides high concentrations of the major contaminant, methyl methacrylate (MMA), the groundwater also containe...

  14. American Indian Telecommunications Satellite Demonstration Project. Summary Report.

    ERIC Educational Resources Information Center

    Lyndon B. Johnson Space Center, Houston, TX.

    The technical feasibility of voice and television communication within and between tribes, between tribes and federal agencies, and between educational institutions and tribes was demonstrated by broadcasts which took place April 10, 12, and 14, 1978, with equipment located at four sites: Crow Agency, Montana; All- Indian Culture Center, New…

  15. Solar demonstration project in a fast-food restaurant

    NASA Astrophysics Data System (ADS)

    McClenahan, D.

    1980-11-01

    The results of a two-phase program in which the first phase included the successful use of heat reclamation equipment and energy conservation techniques at a typical fast-food restaurant are described. The project's second phase involved the engineering, designing, installation and interfacing of a solar collector system at the facility. The report will help to serve as a guide for other restaurants around the state, and possibly the nation, which wish to install energy saving systems, or adopt energy-saving techniques, geared to their special needs and equipment.

  16. Lied Animal Shelter Animal campus Renewable Energy Demonstration Project

    SciTech Connect

    Randy Spitzmesser, AIA

    2005-11-22

    The Animal Shelter campus plan includes a new adoption center coupled with a dog adoption park, a wellness/veterinary technician education center, a show arena, and an addition to the existing shelter that will accommodate all animal control and sheltering for the Las Vegas Valley. The new facility will provide a sophisticated and innovative presentation of the animals to be adopted in an attempt to improve the public's perception of shelter animals. Additionally, the Regional Animal Campus will be a ''green building'', embodying a design intent on balancing environmental responsiveness, resource efficiency and cultural and community sensitivity. Designing an energy-efficient building helps reduce pollution from burning fossil fuels, reduce disturbance of natural habitats for the harvesting of resources and minimizes global warming. The project will be a leader in the use of renewable energy by relying on photovoltaic panels, wind turbines, and solar collectors to produce a portion of the project's energy needs The building will operate more efficiently in comparison to a typical shelter through the use of monitoring and specialized cooling/heating equipment. Windows bringing in natural daylight will reduce the center's demand for electricity.

  17. Next Generation Luminaire (NGL) Downlight Demonstration Project, Hilton Columbus Downtown

    SciTech Connect

    Davis, R. G.; Perrin, T. E.

    2014-09-30

    At the Hilton Columbus Downtown hotel in Ohio, DOE's Better Buildings Alliance conducted a demonstration of Next Generation Luminaires-winning downlights installed in all guest rooms and suites prior to the hotel's 2012 opening. After a post-occupancy assessment, the LED downlights not only provided the aesthetic appearance and dimming functionality desired, but also provided 50% energy savings relative to a comparable CFL downlight and enabled the lighting power to be more than 20% below that allowed by code.

  18. SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky

    SciTech Connect

    1982-03-01

    The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

  19. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    NASA Astrophysics Data System (ADS)

    Widyolar, Bennett K.

    A solar thermal cooling system using novel non-tracking External Compound Parabolic Concentrators (XCPC) has been built at the University of California, Merced and operated for two cooling seasons. Its performance in providing power for space cooling has been analyzed. This solar cooling system is comprised of 53.3 m2 of XCPC trough collectors which are used to power a 23 kW double effect (LiBr) absorption chiller. This is the first system that combines both XCPC and absorption chilling technologies. Performance of the system was measured in both sunny and cloudy conditions, with both clean and dirty collectors. It was found that these collectors are well suited at providing thermal power to drive absorption cooling systems and that both the coinciding of available thermal power with cooling demand and the simplicity of the XCPC collectors compared to other solar thermal collectors makes them a highly attractive candidate for cooling projects.

  20. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    SciTech Connect

    Justin Coleman

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  1. Demonstration Report: ESTCP UXO Discrimination Study ESTCP PROJECT # MM-0838

    SciTech Connect

    Gasperikova, Erika

    2010-02-15

    In 2003, the Defense Science Board observed: 'The problem is that instruments that can detect the buried UXOs also detect numerous scrap metal objects and other artifacts, which leads to an enormous amount of expensive digging. Typically 100 holes may be dug before a real UXO is unearthed! The Task Force assessment is that much of this wasteful digging can be eliminated by the use of more advanced technology instruments that exploit modern digital processing and advanced multi-mode sensors to achieve an improved level of discrimination of scrap from UXOs.' Significant progress has been made in discrimination technology. To date, testing of these approaches has been primarily limited to test sites with only limited application at live sites. Acceptance of discrimination technologies requires demonstration of system capabilities at real UXO sites under real world conditions. Any attempt to declare detected anomalies to be harmless and requiring no further investigation will require demonstration to regulators of not only individual technologies, but of an entire decision making process. This characterization study was be the second phase in what is expected to be a continuing effort that will span several years. The FY06 Defense Appropriation contained funding for the 'Development of Advanced, Sophisticated, Discrimination Technologies for UXO Cleanup' in the Environmental Security Technology Certification Program (ESTCP). ESTCP responded by conducting a UXO Discrimination Study at the former Camp Sibert, AL. The results of this first demonstration were very encouraging. Although conditions were favorable at this site, a single target of interest (4.2-in mortar) and benign topography and geology, all of the classification approaches demonstrated were able to correctly identify a sizable fraction of the anomalies as arising from non-hazardous items that could be safely left in the ground. To build upon the success of the first phase of this study, ESTCP sponsored a

  2. Real Time Technology Application Demonstration Project Final Report

    SciTech Connect

    Volpe, John; Hampson, Steve; Johnson, Robert L

    2008-09-01

    The work and results described in this final report pertain to the demonstration of real-time characterization technologies applied to potentially contaminated surface soils in and around Area of Concern (AOC) 492 at the Paducah Gaseous Diffusion Plant (PGDP). The work was conducted under the auspices of Kentucky Research Consortium for Energy and Environment (KRCEE). KRCEE was created to support the Department of Energy's (DOE) efforts to complete the expeditious and economically viable environmental restoration of the Paducah Gaseous Diffusion Plant (PGDP), the Western Kentucky Wildlife Management Area (WKWMA), and surrounding areas.

  3. Project thermion: Demonstration of a thermionic heat pipe in microgravity

    NASA Astrophysics Data System (ADS)

    Redd, Frank J.; Powell, George E.

    1992-01-01

    The Idaho National Engineering Laboratory (INEL) is conducting intensive research in the design and development of a small, excore heat-pipe-thermionic space nuclear reactor power system (SEHPTR). Progress in this research effort has identified the need for an in-space flight demostration of a thermionic heat pipe element. The proposed demonstration will examine the performance of such a device and verify its operation in microgravity. This paper focuses on the design of a microsatellite-based technology demonstration experiment to measure the effects of microgravity on the performance of an integrated thermionic heat pipe device in low earth orbit. Two scenarios, THERMION-I and THERMION-II, emerged from the design process. Selection between the two will depend upon yet undermined experiment lifetime requirements. THERMION-I is designed for a long-lifetime (greater than one year) investigation of the operations of the thermionic heat pipe element in low earth orbit. Heat input to the element is furnished by a large mirror which collects solar energy and focuses it into a cavity containing the heat pipe device. THERMION-II is a much more simple design which is utilized for short-term (approximately one day) operation. This experiment remains attached to the Delta II second stage and utilizes energy from 253 kg of alkaline batteries to supply thermal energy to the heat pipe device.

  4. West Valley Demonstration Project full-scale canister impact tests

    SciTech Connect

    Whittington, K.F.; Alzheimer, J.M.; Lutz, C.E.

    1995-09-01

    Five West Valley Nuclear Services (WVNS) high-level waste (HLW) canisters were impact tested during 1994 to demonstrate compliance with the drop test requirements of the Waste Acceptance Product Specifications. The specifications state that the canistered waste form must be able to survive a 7{minus}m (23 ft) drop unbreached. The 10-gauge (0.125 in. wall thickness) stainless steel canisters were approximately 85% filled with simulated vitrified waste and weighed about 2100 kg (4600 lb). Each canister was dropped vertically from a height of 7 m (23 ft) onto an essentially unyielding surface. The integrity of the canister was determined by the application and analysis of strain circles, dimensional measurements, and helium leak testing. The canisters were also visually inspected before and after the drop for physical damage. The results of the impact test verify that the canisters survived the 7{minus}m drops unbreached. Therefore, these results demonstrate that the reference canister meets the drop test specification of the Waste Acceptance Product Specification.

  5. Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project

    SciTech Connect

    Bigelow, Erik

    2013-01-01

    The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-­hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-based energy recovery and storage system. This technology is being developed at TDI’s facilities to capture and reuse the energy necessary for the company’s core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries

  6. MILA Antenna Control Unit Replacement Project

    NASA Technical Reports Server (NTRS)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  7. Heber geothermal binary demonstration project: Unavailability distributions for principal pumps

    SciTech Connect

    Mulvihill, Robert J.; Cleveland, Edward B.

    1982-04-01

    The purpose of this study has been to review data sources relevant to the failure rate and mean time to repair for the principal pumps of the Heber geothermal project. Based upon that review the distributions of failure rates, repair times and pump unavailability were established. A total of 16 pumps are represented in this study. The method used to develop data distributions has been to first review as many sources of pump data as are currently available. This review was followed by a study of the features of the pumps specified for the Heber installation and the effects of operation and the environment on those features as they relate to anticipated failure rates and repair times. From this, determinations were made for mean failure rate and repair time values appropriate to specific Heber pumps. Range factors are then selected and used to establish the expected variability of the data. Failure rates and repair times were then combined to obtain the unavailability distribution of each type of pump.

  8. BACA Project: geothermal demonstration power plant. Final report

    SciTech Connect

    Not Available

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  9. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1998-1999.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This document contains 22 brief summaries of the progress made by Pennsylvania Adult Education Section 353 Special Demonstration projects in meeting their goals and objectives. For each project, the following information is included: project director and number; purpose; impact; outcomes; conclusions and recommendations; project continuation and…

  10. Exercise Countermeasures Demonstration Project During the Lunar-Mars Life Support Test Project Phase 2A

    NASA Technical Reports Server (NTRS)

    Lee, Stuart M. C.; Guilliams, Mark E.; Moore, Alan D., Jr.; Williams, W. Jon; Greenisen, M. C.; Fortney, S. M.

    1998-01-01

    This demonstration project assessed the crew members' compliance to a portion of the exercise countermeasures planned for use onboard the International Space Station (ISS) and the outcomes of their performing these countermeasures. Although these countermeasures have been used separately in other projects and investigations, this was the first time they'd been used together for an extended period (60 days) in an investigation of this nature. Crew members exercised every day for six days, alternating every other day between aerobic and resistive exercise, and rested on the seventh day. On the aerobic exercise days, subjects exercised on an electronically braked cycle ergometer using a protocol that has been previously shown to maintain aerobic capacity in subjects exposed to a space flight analogue. On the resistive exercise days, crew members performed five major multijoint resistive exercises in a concentric mode, targeting those muscle groups and bones we believe are most severely affected by space flight. The subjects favorably tolerated both exercise protocols, with a 98% compliance to aerobic exercise prescription and a 91% adherence to the resistive exercise protocol. After 60 days, the crew members improved their peak aerobic capacity by an average 7%, and strength gains were noted in all subjects. These results suggest that these exercise protocols can be performed during ISS, lunar, and Mars missions, although we anticipate more frequent bouts with both protocols for long-duration spaceflight. Future projects should investigate the impact of increased exercise duration and frequency on subject compliance, and the efficacy of such exercise prescriptions.

  11. Forestry timber typing. Tanana demonstration project, Alaska ASVT. [Alaska

    NASA Technical Reports Server (NTRS)

    Morrissey, L. A.; Ambrosia, V. G.

    1982-01-01

    The feasibility of using LANDSAT digital data in conjunction with topographic data to delineate commercial forests by stand size and crown closure in the Tanana River basin of Alaska was tested. A modified clustering approach using two LANDSAT dates to generate an initial forest type classification was then refined with topographic data. To further demonstrate the ability of remotely sensed data in a fire protection planning framework, the timber type data were subsequently integrated with terrain information to generate a fire hazard map of the study area. This map provides valuable assistance in initial attack planning, determining equipment accessibility, and fire growth modeling. The resulting data sets were incorporated into the Alaska Department of Natural Resources geographic information system for subsequent utilization.

  12. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Department's Program Effectiveness Panel as defined in 34 CFR 400.4(b). (e) Demonstration and dissemination... key personnel in project management and in fields related to the objectives of the project. For the... application for a demonstration project: (a) Program factors. (10 points) The Secretary reviews...

  13. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Department's Program Effectiveness Panel as defined in 34 CFR 400.4(b). (e) Demonstration and dissemination... key personnel in project management and in fields related to the objectives of the project. For the... application for a demonstration project: (a) Program factors. (10 points) The Secretary reviews...

  14. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Department's Program Effectiveness Panel as defined in 34 CFR 400.4(b). (e) Demonstration and dissemination... key personnel in project management and in fields related to the objectives of the project. For the... application for a demonstration project: (a) Program factors. (10 points) The Secretary reviews...

  15. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Department's Program Effectiveness Panel as defined in 34 CFR 400.4(b). (e) Demonstration and dissemination... key personnel in project management and in fields related to the objectives of the project. For the... application for a demonstration project: (a) Program factors. (10 points) The Secretary reviews...

  16. Rationale, design, and methods for process evaluation in the Childhood Obesity Research Demonstration project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding peri...

  17. NASA's Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) In-Field Demonstration at Desert RATS 2010

    NASA Technical Reports Server (NTRS)

    Tri, Terry O.; Kennedy, Kriss J.; Toups, Larry; Gill, Tracy R.; Howe, A. Scott

    2011-01-01

    This paper describes the construction, assembly, subsystem integration, transportation, and field testing operations associated with the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) and discusses lessons learned. In a one-year period beginning summer 2009, a tightly scheduled design-develop-build process was utilized by a small NASA "tiger team" to produce the functional HDU-PEM prototype in time to participate in the 2010 Desert Research and Technology Studies (Desert RATS) field campaign. The process required the coordination of multiple teams, subcontractors, facility management and safety staff. It also required a well-choreographed material handling and transportation process to deliver the finished product from the NASA-Johnson Space Center facilities to the remote Arizona desert locations of the field test. Significant findings of this paper include the team s greater understanding of the HDU-PEM s many integration issues and the in-field training the team acquired which will enable the implementation of the next-generation of improvements and development of high-fidelity field operations in a harsh environment. The Desert RATS analog environment is being promoted by NASA as an efficient means to design, build, and integrate multiple technologies in a mission architecture context, with the eventual goal of evolving the technologies into robust flight hardware systems. The HDU-PEM in-field demonstration at Desert RATS 2010 provided a validation process for the integration team, which has already begun to retool for the 2011 field tests that require an adapted architecture.

  18. Final report on Thermally Modified Sand demonstration project

    SciTech Connect

    Not Available

    1994-09-23

    The use of salt and salt/sand mixtures on icy roadway surfaces has dramatically increased during the past 30 years. Despite extensive documentation on salt related damage to the roadway improvements, vehicles and the environment, road maintenance departments have continued to rely on this practice. Road maintenance departments in northern climate areas have long recognized the safety benefits for public mobility on icy roadways from the use of sand. As an abrasive material, the sand improves the surface traction that results in more drivable and less hazardous road conditions during the winter months. Stockpiles of pure sand stored during the winter months oftentimes freeze into large unworkable, monolithic piles. To maintain a free-flowing condition, it has been found to be necessary to add salt to the sand. The addition of salt in amounts ranging from 5 to 10 percent to that of sand, is usually sufficient to provide relatively free-flowing abrasive material that could be stored in stockpiles and applied to icy road surfaces with conventional sand spreading trucks. Another alternative for winter storage of pure sand to maintain a free-flowing condition is in humidity-controlled, heated buildings. As would be expected, this method has high capital and operating costs. and not cost effective for general highway maintenance use. The invention demonstrated herein is a method of thermally modifying pure sand that will remain in a free-flowing state throughout the winter season without the need for the salt additive. The thermally modified sand provides an abrasive material that when applied to icy roads does not cause environmental and corrosive damage as done by the application of sand with salt. By employing a very simple process of freezing screened sand particles by forced air convection under subfreezing conditions, the invention creates a product that has significant value in terms of economic and environmental benefits.

  19. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  20. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program... conduct experimental, pilot, and demonstration projects to promote the objectives or improve...

  1. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program... conduct experimental, pilot, and demonstration projects to promote the objectives or improve...

  2. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program... conduct experimental, pilot, and demonstration projects to promote the objectives or improve...

  3. Consumption Economy. Grade Ten. Resource Unit VI. Project Social Studies.

    ERIC Educational Resources Information Center

    Minnesota Univ., Minneapolis. Project Social Studies Curriculum Center.

    The tenth grade unit, developed by the University of Minnesota's Project Social Studies, is the sixth and last unit on continuity and change in American civilization. The development of the consumption economy and its social implications are studied. Major attention is given to the depression of the 1930's and to an analytical study of the causes…

  4. Minneapolis Multi-Ethnic Curriculum Project--Ethnicity Unit.

    ERIC Educational Resources Information Center

    Skjervold, Christian K.; And Others

    The student booklet presents short case studies illustrating the ethnicity unit of the Minneapolis Multi-Ethnic Curriculum Project for secondary schools. Twelve brief chapters describe various aspects of the life, values, behavior, education, culture, and religious ceremonies and feelings of different ethnic groups in the United States. They…

  5. Minneapolis Multi-Ethnic Curriculum Project--Family Unit.

    ERIC Educational Resources Information Center

    Skjervold, Christian K.; And Others

    The student booklet presents short case studies illustrating the family unit of the Minneapolis Multi-Ethnic Curriculum Project for secondary schools. Thirteen brief chapters describe family life and patterns of different ethnic groups in the United States. They present stories of individuals in groups such as Puerto Ricans, Swedish Americans,…

  6. Minneapolis Multi-Ethnic Curriculum Project--Migration Unit.

    ERIC Educational Resources Information Center

    Minneapolis Public Schools, Minn. Dept. of Intergroup Education.

    The student booklet presents short chapters illustrating the migration unit of the Minneapolis Multi-Ethnic Curriculum Project for secondary schools. Sixteen brief chapters describe migration, immigration, and emigration in the United States. The first six chapters offer first person accounts of immigrants from Norway, Korea, Egypt, Hitler's…

  7. Overview of two story walkup flat type unit illustrating projecting ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of two story walk-up flat type unit illustrating projecting balconies and concrete stairways. Original pipe railings replaced by square tube railing. Building 26, view facing east - Harbor Hills Housing Project, Two Story Walk-Up Type, 26607 Western Avenue, Lomita, Los Angeles County, CA

  8. Rectification of SEMG as a tool to demonstrate synchronous motor unit activity during vibration.

    PubMed

    Sebik, Oguz; Karacan, Ilhan; Cidem, Muharrem; Türker, Kemal S

    2013-04-01

    The use of surface electromyography (SEMG) in vibration studies is problematic since motion artifacts occupy the same frequency band with the SEMG signal containing information on synchronous motor unit activity. We hypothesize that using a harsher, 80-500 Hz band-pass filter and using rectification can help eliminate motion artifacts and provide a way to observe synchronous motor unit activity that is phase locked to vibration using SEMG recordings only. Multi Motor Unit (MMU) action potentials using intramuscular electrodes along with SEMG were recorded from the gastrocnemius medialis (GM) of six healthy male volunteers. Data were collected during whole body vibration, using vibration frequencies of 30 Hz, 35 Hz, 40 Hz or 50 Hz. A computer simulation was used to investigate the efficacy of filtering under different scenarios: with or without artifacts and/or motor unit synchronization. Our findings indicate that motor unit synchronization took place during WBV as verified by MMU recordings. A harsh filtering regimen along with rectification proved successful in demonstrating motor unit synchronization in SEMG recordings. Our findings were further supported by the results from the computer simulation, which indicated that filtering and rectification was efficient in discriminating motion artifacts from motor unit synchronization. We suggest that the proposed signal processing technique may provide a new methodology to evaluate the effects of vibration treatments using only SEMG. This is a major advantage, as this non-intrusive method is able to overcome movement artifacts and also indicate the synchronization of underlying motor units. PMID:23098913

  9. Dropout Prevention and Reentry Act of 1985. Hearing before the Subcommittee on Education, Arts and Humanities of the Committee on Labor and Human Resources. United States Senate, Ninety-Ninth Congress, First Session on S. 1525 to Amend the Elementary and Secondary Education Act of 1965 to Provide Grants to Local Educational Agencies for Dropout Prevention Demonstration Projects (October 17, 1985).

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Labor and Human Resources.

    This document presents the text of the Senate hearing on the Dropout Prevention and Reentry Act of 1985, a bill designed to amend the Elementary and Secondary Education Act of 1965 to provide grants to local educational agencies for dropout prevention demonstration projects. Testimony is delivered by Senators Stafford, Pell, Chafee, Bradley,…

  10. Improved secondary recovery demonstration for the Sooner Unit. Quarterly technical report, January 1, 1995--March 31, 1995

    SciTech Connect

    1995-05-08

    The objective of this project is to demonstrate the effectiveness of geologically targeted infill drilling and improved reservoir management to obtain maximum oil recovery from the Sooner Unit in the Denver-Julesburg (D-J) Basin. The Sooner Unit Field is located about 100 miles northeast from Denver, Colorado and produces from the fluvial-deltaic Cretaceous {open_quotes}D{close_quotes} Sand formation at an average depth of 6,200 ft. The first phase of the project will involve multi-disciplinary reservoir characterization and recovery identification in which high-density 3-D seismic. detailed stratigraphy and engineering analysis will be used to identify optimum infill well sites and production/withdrawal schedules. One well will be drilled during this phase to obtain data pertinent to seismic activities. The second phase will involve implementation of the selected technologies by drilling geologically targeted infill wells and establishing production/injection schedules. Evaluation of results from the second phase will be performed using reservoir simulation. transient well tests and careful production tests of producing wells. The objective will be to compare the prediction of ultimate recovery resulting from the implementation of these technologies with that which would have occurred in the absence of these technologies. The third phase of the project will involve technology transfer through a series of technical papers and presentations of a short course. Emphasis will be on the economics of the project and implemented technologies. Small to medium sized independents will be targeted. The success of this project and effective technology transfer should prompt-re-appraisal of older waterflood projects and implementation of new projects in oil provinces such as the D-J Basin.

  11. Testing of an Annular Linear Induction Pump for the Fission Surface Power Technology Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Polzin, K. A.; Pearson, J. B.; Webster, K.; Godfoy, T. J.; Bossard, J. A.

    2013-01-01

    Results of performance testing of an annular linear induction pump that has been designed for integration into a fission surface power technology demonstration unit are presented. The pump electromagnetically pushes liquid metal (NaK) through a specially-designed apparatus that permits quantification of pump performance over a range of operating conditions. Testing was conducted for frequencies of 40, 55, and 70 Hz, liquid metal temperatures of 125, 325, and 525 C, and input voltages from 30 to 120 V. Pump performance spanned a range of flow rates from roughly 0.3 to 3.1 L/s (4.8 to 49 gpm), and pressure heads of <1 to 104 kPa (<0.15 to 15 psi). The maximum efficiency measured during testing was 5.4%. At the technology demonstration unit operating temperature of 525 C the pump operated over a narrower envelope, with flow rates from 0.3 to 2.75 L/s (4.8 to 43.6 gpm), developed pressure heads from <1 to 55 kPa (<0.15 to 8 psi), and a maximum efficiency of 3.5%. The pump was supplied with three-phase power at 40 and 55 Hz using a variable-frequency motor drive, while power at 55 and 70 Hz was supplied using a variable-frequency power supply. Measured performance of the pump at 55 Hz using either supply exhibited good quantitative agreement. For a given temperature, the peak in efficiency occurred at different flow rates as the frequency was changed, but the maximum value of efficiency was relative insensitive within 0.3% over the frequency range tested, including a scan from 45 to 78 Hz. The objectives of the FSP technology project are as follows:5 • Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. • Establish a nonnuclear hardware-based technical foundation for FSP design concepts to reduce overall development risk. • Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. • Generate the key nonnuclear products to allow Agency

  12. 75 FR 55109 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Defense Science and Technology Reinvention Laboratory Personnel Management Demonstration Project..., September 9, 2010 / Notices#0;#0; ] DEPARTMENT OF DEFENSE Office of the Secretary Science and Technology... Defense to conduct personnel demonstration projects at DoD laboratories designated as Science...

  13. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  14. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  15. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... Requirements § 404.1629 Participation in research and demonstration projects. We will invite...

  16. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... Requirements § 404.1629 Participation in research and demonstration projects. We will invite...

  17. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... Requirements § 404.1629 Participation in research and demonstration projects. We will invite...

  18. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  19. The Social Security Administration's Youth Transition Demonstration Projects: Interim Report on Transition WORKS

    ERIC Educational Resources Information Center

    Fraker, Thomas; Black, Alison; Mamun, Arif; Manno, Michelle; Martinez, John; O'Day, Bonnie; O'Toole, Meghan; Rangarajan, Anu; Reed, Debbie

    2011-01-01

    The Social Security Administration is funding a random assignment evaluation of six demonstration projects to improve employment and other outcomes for youth ages 14 to 25 who are either receiving disability benefits or are at high risk of receiving them in the future. This report reviews the Youth Transition Demonstration (YTD) projects, located…

  20. 78 FR 34655 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-10

    ...On December 10, 2010 (75 FR 77380-77447), DoD published a notice of approval of a personnel management demonstration project for eligible ONR employees. Within that notice, there were several typographical errors discovered. Additionally, after the publication of the notice and implementation of the demonstration project, ONR determined that for effective personnel management practices,......

  1. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  2. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  3. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  4. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  5. 45 CFR 2532.20 - Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Kuskokwim Delta of Alaska. 2532.20 Section 2532.20 Public Welfare Regulations Relating to Public Welfare... § 2532.20 Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. (a) Special Demonstration Project for the Yukon-Kuskokwim Delta of Alaska. The President may award grants to, and enter...

  6. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE... Requirements § 404.1629 Participation in research and demonstration projects. We will invite...

  7. 20 CFR 416.1029 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Participation in research and demonstration projects. 416.1029 Section 416.1029 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... Responsibilities and Requirements § 416.1029 Participation in research and demonstration projects. We will...

  8. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... projects in the SSI program. 416.250 Section 416.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program... administration of the SSI program. These projects will test the advantages of altering certain...

  9. Worker Relocation: A Review of U.S. Department of Labor Mobility Demonstration Projects. Final Report.

    ERIC Educational Resources Information Center

    Fairchild, Charles K.

    This report reviews the knowledge gained in 4 years of operation of labor mobility demonstration projects and provides guidelines on the design and operation of a permanent worker relocation program. Data were gathered both from written material covering the experience of each project and from field trips to some of the projects when additional…

  10. Algebra Project DR K-12 Cohorts--Demonstration Project: Summative Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark

    2014-01-01

    The Algebra Project DR K-12, funded by the National Science Foundation as a Research and Development Project, addressed the challenge of offering significant STEM content for students to ensure public literacy and workforce readiness. The project's primary purpose was to test the feasibility and effectiveness of a model for establishing four-year…

  11. Bilingual Readiness in Earliest School Years; A Curriculum Demonstration Project. Bilingual Readiness in Primary Grades; An Early Childhood Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Finocchiaro, Mary; King, Paul F.

    These two curriculum demonstration projects on bilingual readiness in the earliest school years contain many similarities. Both were formed on the thesis that young children can and will learn a second language readily and that the urban classroom mixture of Spanish-speaking, English-speaking, and Negro-dialect speaking children can be capitalized…

  12. In Situ Site Characterization Technologies Demonstrated at the INEEL in Decommissioning Projects

    SciTech Connect

    Wright, Kelly Clyde; Meservey, Richard Harlan; Whitmill, Larry Joseph

    1999-04-01

    The United States Department of Energy (DOE)continually seeks safer, more cost-effective, and better performing technologies for decontamination and decommissioning (D&D) of nuclear facilities. The Deactivation and Decommissioning Focus Area (DDFA) of the DOE Federal Energy Technology Center (FETC) sponsors Large Scale Demonstration and Deployment Projects (LSDDPs) which are conducted at various DOE sites. The Idaho National Engineering and Environmental Laboratory (INEEL) is one of the DOE sites for demonstration of these newa and improved technologies. The INEEL needs statement defines specific needs or problems for their D&D program. One of the needs identified at the INEEL was for new or improved site characterization technologies. A variety of in-situ site characterization technologies have been demonstrated through the INEEL LSDDP. These technologies provide a safer means of characterization, improved documentation, real-time information, improved D&D schedules, and reduction in costs and radiation exposures to workers. These technologies have provided vast improvements to the D&D site characterizations. Some of these technologies include: • The Global Positioning Radiometric Scanner System for large-area, surface gamma radiation surveys • Remote underwater characterization system• Identifying heavy metals in painted surfaces and determining the alloy composition in metallic material • In-Situ Object Counting System for free release • Real-time radiological data acquisition with the Surveillance and Measurement’s sodium iodide detector • Electromagnetic radiography to locate contaminated soils. Historically, site characterization has been a slow, costly, and tedious process. However, through these demonstrations, new technologies have provided more accurate data, real-time information, and enhanced site characterization documentation. In addition, a safer work environment has been established as a result of decreasing the worker’s time

  13. Fermilab Project X nuclear energy application: Accelerator, spallation target and transmutation technology demonstration

    SciTech Connect

    Gohar, Yousry; Johnson, David; Johnson, Todd; Mishra, Shekhar; /Fermilab

    2011-04-01

    The recent paper 'Accelerator and Target Technology for Accelerator Driven Transmutation and Energy Production' and report 'Accelerators for America's Future' have endorsed the idea that the next generation particle accelerators would enable technological breakthrough needed for nuclear energy applications, including transmutation of waste. In the Fall of 2009 Fermilab sponsored a workshop on Application of High Intensity Proton Accelerators to explore in detail the use of the Superconducting Radio Frequency (SRF) accelerator technology for Nuclear Energy Applications. High intensity Continuous Wave (CW) beam from the Superconducting Radio Frequency (SRF) Linac (Project-X) at beam energy between 1-2 GeV will provide an unprecedented experimental and demonstration facility in the United States for much needed nuclear energy Research and Development. We propose to carry out an experimental program to demonstrate the reliability of the accelerator technology, Lead-Bismuth spallation target technology and a transmutation experiment of spent nuclear fuel. We also suggest that this facility could be used for other Nuclear Energy applications.

  14. Integration of the Electrodynamic Dust Shield on a Lunar Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Calle, C. I.; Immer, C. D.; Ferreira, J.; Hogue, M. D.; Chen, A.; Csonka, M. W.; VanSuetendael, N.; Snyder, S. J.

    2010-01-01

    NASA is developing a Habitat Demonstration Unit (HDU) to investigate the feasibility of lunar surface technologies and lunar ground operations. The HDU will define and validate lunar scenario architecture through field analog testing. It will contain a four-port vertical habitat module with docking demonstration capabilities. The Electrodynamic Oust Shield (EDS) is being incorporated into the HDU to demonstrate dust removal from a viewport and from a door prior to docking procedures. In this paper, we will describe our efforts to scale up the EDS to protect a viewport 20 cm in diameter. We will also describe the development of several 20 cm x 25 cm EDS patches to demonstrate dust removal from one of the HDU doors.

  15. Demonstration of optimum fuel-to-moderator ratio in a PWR unit fuel cell

    SciTech Connect

    Feltus, M.A.; Pozsgai, C. )

    1992-01-01

    Nuclear engineering students at The Pennsylvania State University develop scaled-down [[approx]350 MW(thermal)] pressurized water reactors (PWRs) using actual plants as references. The design criteria include maintaining the clad temperature below 2200[degree]F, fuel temperature below melting point, sufficient departure from nucleate boiling ratio (DNBR) margin, a beginning-of-life boron concentration that yields a negative moderator temperature coefficient, an adequate cycle power production (330 effective full-power days), and a batch loading scheme that is economical. The design project allows for many degrees of freedom (e.g., assembly number, pitch and height and batch enrichments) so that each student's result is unique. The iterative nature of the design process is stressed in the course. The LEOPARD code is used for the unit cell depletion, critical boron, and equilibrium xenon calculations. Radial two-group diffusion equations are solved with the TWIDDLE-DEE code. The steady-state ZEBRA thermal-hydraulics program is used for calculating DNBR. The unit fuel cell pin radius and pitch (fuel-to-moerator ratio) for the scaled-down design, however, was set equal to the already optimized ratio for the reference PWR. This paper describes an honors project that shows how the optimum fuel-to-moderator ratio is found for a unit fuel cell shown in terms of neutron economics. This exercise illustrates the impact of fuel-to-moderator variations on fuel utilization factor and the effect of assuming space and energy separability.

  16. 77 FR 22770 - Termination of Provider Reimbursement Demonstration Project for the State of Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... INFORMATION: On November 20, 2006 (71 FR 67113), DoD published a Notice of a TRICARE demonstration project for... years, ending on December 31, 2009. The demonstration was extended twice. On December 18, 2009 (74 FR... December 31, 2010, and on July 8, 2010 (75 FR 39213), DoD published a Notice of demonstration...

  17. Wind-powered electric generation runway lighting system demonstration project. Interim final technical report, September 15, 1981-December 15, 1983

    SciTech Connect

    Mesa, D.

    1984-01-01

    The project is a small scale demonstration project to determine the feasibility of using wind-powered generation of electricity to operate the runway lighting system at Half Moon Bay Airport. The airport is located in San Mateo County near Highway 1, approximately 15 miles south of San Francisco, California. The project is a joint effort of San Mateo County, the California Department of Transportation, Division of Aeronautics, and the United States Department of Energy. The concept of wind-powered turbines to produce electrical power, which is not new or unique, has been demonstrated many times. This project seeks to determine if wind power has practical application to an airport environment as a cost-effective means of providing an alternate source of energy. Should the results of this demonstration be positive, the technology can be applied to airports statewide which possess the meteorological conditions conducive to wind power generation. Concurrently included in the demonstration project, and funded separately, is the construction of a runway lighting system designed for low energy use. The total system is tied into PG and E's grid system.

  18. Miniaturized Power Processing Unit Study: A Cubesat Electric Propulsion Technology Enabler Project

    NASA Technical Reports Server (NTRS)

    Ghassemieh, Shakib M.

    2014-01-01

    This study evaluates High Voltage Power Processing Unit (PPU) technology and driving requirements necessary to enable the Microfluidic Electric Propulsion technology research and development by NASA and university partners. This study provides an overview of the state of the art PPU technology with recommendations for technology demonstration projects and missions for NASA to pursue.

  19. Demonstration of EPRI heat-rate improvement guidelines at North Omaha Unit 5

    SciTech Connect

    Not Available

    1993-03-01

    Omaha Public Power District used EPRI's Heat-Rate Improvement Guidelines for Existing Fossil Plants to evaluate thermal performance, determine magnitude and causes of heat-rate degradation, and recommend corrective actions at its North Omaha unit 5. The project showed that cost-effective heat-rate improvements ranging between 250 Btu/kWh at full load and 1000 Btu/kWh at part load are possible. Utilities can use the methods in this report to adapt EPRI guidelines to their own needs. The project team developed a plan for using the guidelines, including schedules, communication channels, and responsibilities of key individuals. The team determined the best achievable heat rate for the unit by evaluating design information, acceptance test.data, and plant changes. By comparing these data with current unit performance, investigators were able to determine the potential for heat-rate improvement. They also modified a set of heat-rate logic trees, originally presented in EPRI report CS-4554. These modifications helped them diagnose causes of heat-rate losses at North Omaha unit 5. They then determined the potential performance improvement of the corrective measures identified in the root-cause evaluation. Using economic studies, researchers identified and ranked cost-effective methods for improving heat rate. Plant improvements with recovery periods of five years or less may yield large heat-rate gains. Investigators identified the following plant improvements, resulting in heat-rate gains of 250 Btu/kWh: High-pressure turbine seal replacement; Air heater seal replacement; Improved feedwater heater level monitoring.

  20. Demonstration of EPRI heat-rate improvement guidelines at North Omaha Unit 5. Final report

    SciTech Connect

    Not Available

    1993-03-01

    Omaha Public Power District used EPRI`s Heat-Rate Improvement Guidelines for Existing Fossil Plants to evaluate thermal performance, determine magnitude and causes of heat-rate degradation, and recommend corrective actions at its North Omaha unit 5. The project showed that cost-effective heat-rate improvements ranging between 250 Btu/kWh at full load and 1000 Btu/kWh at part load are possible. Utilities can use the methods in this report to adapt EPRI guidelines to their own needs. The project team developed a plan for using the guidelines, including schedules, communication channels, and responsibilities of key individuals. The team determined the best achievable heat rate for the unit by evaluating design information, acceptance test.data, and plant changes. By comparing these data with current unit performance, investigators were able to determine the potential for heat-rate improvement. They also modified a set of heat-rate logic trees, originally presented in EPRI report CS-4554. These modifications helped them diagnose causes of heat-rate losses at North Omaha unit 5. They then determined the potential performance improvement of the corrective measures identified in the root-cause evaluation. Using economic studies, researchers identified and ranked cost-effective methods for improving heat rate. Plant improvements with recovery periods of five years or less may yield large heat-rate gains. Investigators identified the following plant improvements, resulting in heat-rate gains of 250 Btu/kWh: High-pressure turbine seal replacement; Air heater seal replacement; Improved feedwater heater level monitoring.

  1. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    EPA Science Inventory

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  2. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1997-1998.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This document contains project abstracts for 29 adult basic and literacy education (ABLE) demonstration programs that were conducted in Pennsylvania in 1997-1998 through grants funded under Section 353 of the Adult Education Act. Each abstract includes the following: project name, number, purpose, impact, outcomes, conclusions/recommendations,…

  3. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Town of Arnaudville, LA - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the United Water Systems’ facility in Arnaudville, LA. The objectives of the project were to evaluate: (1) the effectiveness of K...

  4. Green River Formation Water Flood Demonstration Project: Final report. [October 21, 1992-April, 30, 1996

    SciTech Connect

    Deo, M.D.; Dyer, J.E.; Lomax, J.D.; Nielson, D.L.; Lutz, S.J.

    1996-11-01

    The objectives were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. Comprehensive reservoir characterization and reservoir simulations of the Monument Butte, Travis and Boundary units were presented in the two published project yearly reports. The primary and the secondary production from the Monument Butte unit were typical of oil production from an undersaturated oil reservoir close to its bubble point. The water flood in the smaller Travis unit appeared affected by natural and possibly by large interconnecting hydraulic fractures. Water flooding the boundary unit was considered more complicated due to the presence of an oil water contact in one of the wells. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter c ore, Formation Micro Imaging logs from several wells and Magnetic Resonance Imaging logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir characterization efforts identified new reservoirs in the Travis and the Boundary units. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2000 barrels per day.

  5. Minneapolis Multi-Ethnic Curriculum Project--Acculturation Unit.

    ERIC Educational Resources Information Center

    Skjervold, Christian K.; And Others

    The student booklet presents short case studies illustrating the acculturation unit of the Minneapolis Multi-Ethnic Curriculum Project for secondary schools. It is presented in nine chapters. Chapter I provides background information on immigration and points out ways acculturation takes place. Chapter II, "Barrio Boy," tells of life in a Mexican…

  6. Minneapolis Multi-Ethnic Curriculum Project--Prejudice/Discrimination Unit.

    ERIC Educational Resources Information Center

    Skjervold, Christian K.; And Others

    The student booklet presents short chapters illustrating the prejudice/discrimination unit of the Minneapolis Multi-Ethnic Curriculum Project for secondary schools. Fifteen brief chapters describe the ways Americans have and still do discriminate against the people of various ethnic groups. Topics cover the history and policies of the Know-Nothing…

  7. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Final Technical Report

    SciTech Connect

    Verma, Puneet; Casey, Dan

    2011-03-29

    This report summarizes the work conducted under U.S. Department of Energy (US DOE) contract DE-FC36-04GO14286 by Chevron Technology Ventures (CTV, a division of Chevron U.S.A., Inc.), Hyundai Motor Company (HMC), and UTC Power (UTCP, a United Technologies company) to validate hydrogen (H2) infrastructure technology and fuel cell hybrid vehicles. Chevron established hydrogen filling stations at fleet operator sites using multiple technologies for on-site hydrogen generation, storage, and dispensing. CTV constructed five demonstration stations to support a vehicle fleet of 33 fuel cell passenger vehicles, eight internal combustion engine (ICE) vehicles, three fuel cell transit busses, and eight internal combustion engine shuttle busses. Stations were operated between 2005 and 2010. HMC introduced 33 fuel cell hybrid electric vehicles (FCHEV) in the course of the project. Generation I included 17 vehicles that used UTCP fuel cell power plants and operated at 350 bar. Generation II included 16 vehicles that had upgraded UTC fuel cell power plants and demonstrated options such as the use of super-capacitors and operation at 700 bar. All 33 vehicles used the Hyundai Tucson sports utility vehicle (SUV) platform. Fleet operators demonstrated commercial operation of the vehicles in three climate zones (hot, moderate, and cold) and for various driving patterns. Fleet operators were Southern California Edison (SCE), AC Transit (of Oakland, California), Hyundai America Technical Center Inc. (HATCI), and the U.S. Army Tank Automotive Research, Development and Engineering Center (TARDEC, in a site agreement with Selfridge Army National Guard Base in Selfridge, Michigan).

  8. Green River formation water flood demonstration project, Uinta Basin, Utah. Quarterly technical progress report, April 1, 1995--June 30, 1995

    SciTech Connect

    Lomax, J.D.; Nielson, D.L.; Deo, M.D.

    1995-09-01

    The objective of the project was to understand the water flood mechanisms underway in Monument Butte unit water flood and apply the technology, if possible to the Travis and the Boundary units. The purpose of the project was also to transfer the water flood technology to nearby units/fields/reservoirs. Technical progress is briefly described for the Monument Butte Unit, Travis Unit, and Boundary Unit.

  9. Learning through a portfolio of carbon capture and storage demonstration projects

    NASA Astrophysics Data System (ADS)

    Reiner, David M.

    2016-01-01

    Carbon dioxide capture and storage (CCS) technology is considered by many to be an essential route to meet climate mitigation targets in the power and industrial sectors. Deploying CCS technologies globally will first require a portfolio of large-scale demonstration projects. These first projects should assist learning by diversity, learning by replication, de-risking the technologies and developing viable business models. From 2005 to 2009, optimism about the pace of CCS rollout led to mutually independent efforts in the European Union, North America and Australia to assemble portfolios of projects. Since 2009, only a few of these many project proposals remain viable, but the initial rationales for demonstration have not been revisited in the face of changing circumstances. Here I argue that learning is now both more difficult and more important given the slow pace of deployment. Developing a more coordinated global portfolio will facilitate learning across projects and may determine whether CCS ever emerges from the demonstration phase.

  10. FCV Learning Demonstration: Project Midpoint Status and First-Generation Vehicle Results; Preprint

    SciTech Connect

    Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

    2007-12-01

    This paper covers the progress accomplished by the U.S. DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project since inception, including results from analysis of six months of new data.

  11. 2 kWe Solar Dynamic Ground Test Demonstration Project. Volume 3; Fabrication and Test Report

    NASA Technical Reports Server (NTRS)

    Alexander, Dennis

    1997-01-01

    The Solar Dynamic Ground Test Demonstration (SDGTD) project has successfully designed and fabricated a complete solar-powered closed Brayton electrical power generation system and tested it in a relevant thermal vacuum facility at NASA Lewis Research Center (LeRC). In addition to completing technical objectives, the project was completed 3-l/2 months early, and under budget.

  12. [Science and Self-Determination Upward Bound National Demonstration Project. Report and Evaluation, First Cycle].

    ERIC Educational Resources Information Center

    Williams, Richard; And Others

    Upward Bound's National Demonstration Project "Science and Self-Determination" (SSD) awarded to the American Indian Educational Opportunity Program at University of Colorado, Boulder, in 1980 shares a common purpose with other Upward Bound Projects: to provide opportunity to low income and otherwise disadvantaged secondary students to attend…

  13. 77 FR 66182 - TRICARE Over-the-Counter Drug Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... a notice in the Federal Register (72 FR 33208-33210) implementing the demonstration project until... beneficiary satisfaction with the project, the Department published a notice in the Federal Register (74 FR... beneficiary satisfaction of providing OTC drugs under the pharmacy benefits program when the selected...

  14. American Indian Community Library Demonstration Project. First--Fourth Quarterly Reports, 1976-77.

    ERIC Educational Resources Information Center

    Smith, Lotsee

    Quarterly progress reports present the major accomplishments and activities of four American Indian Community Library Demonstration projects funded during 1976-1977. These projects established library services in New Mexico for four previously unserved Pueblo communities: Cochiti, Santo Domingo, Sky City, and Laguna. For each quarter, an overall…

  15. Evaluating a "Second Life" Problem-Based Learning (PBL) Demonstrator Project: What Can We Learn?

    ERIC Educational Resources Information Center

    Beaumont, Chris; Savin-Baden, Maggi; Conradi, Emily; Poulton, Terry

    2014-01-01

    This article reports the findings of a demonstrator project to evaluate how effectively Immersive Virtual Worlds (IVWs) could support problem-based learning. The project designed, created and evaluated eight scenarios within "Second Life" (SL) for undergraduate courses in health care management and paramedic training. Evaluation was…

  16. The NEPAD e-Schools Demonstration Project: A Work in Progress. A Public Report

    ERIC Educational Resources Information Center

    Farrell, Glen; Isaacs, Shafika; Trucano, Michael

    2007-01-01

    The NEPAD e-Schools Initiative is a multi-country, multi-stakeholder, continental project to teach ICT skills to young Africans in primary and secondary schools and improve the provision of education in schools through the use of ICT applications and the Internet. The first phase of the Initiative is a "Demonstration Project" ("Demo") being…

  17. URBAN SOIL LEAD ABATEMENT DEMONSTRATION PROJECT: VOLUME I, U.S. EPA INTEGRATED REPORT

    EPA Science Inventory

    The Urban Soil Lead Abatement Demonstration Project (USLADP), known also as the A Three City Lead Study,was authorized in 1986 under Section 111(b)(6) of the Superfund Amendments and Reauthorization Act (SARA), which mandated that EPA conduct soil lead abatement projects in up to...

  18. An aerial radiological survey of the West Valley Demonstration Project and surrounding area, West Valley, New York

    SciTech Connect

    Berry, H.A.

    1991-09-01

    An aerial radiological survey of the West Valley Demonstration Project and the surrounding area was conducted from mid-August through early September 1984 by EG G Energy Measurements, Inc. for the United States Department of Energy. The radiological survey was part of the United States Department of Energy Comprehensive Integrated Remote Sensing (CIRS) program, which provides state-of-the-art remote sensing to support the needs of the various DOE facilities. The survey consisted of airborne measurements of both natural and man-made gamma radiation emanating from the terrestrial surface. These measurements allowed an estimate of the distribution of isotopic concentrations in the area surrounding the project site. Results are reported as isopleths superimposed on aerial photographs of the area. Gamma ray energy spectra are also presented for the net man-made radionuclides. 8 refs., 16 figs., 9 tabs.

  19. Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott

    2012-01-01

    A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

  20. Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

    NASA Astrophysics Data System (ADS)

    Mason, L.; Palac, D.; Gibson, M.; Houts, M.; Warren, J.; Werner, J.; Poston, D.; Qualls, L.; Radel, R.; Harlow, S.

    A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

  1. Cold-End Subsystem Testing for the Fission Power System Technology Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Briggs, Mazwell; Gibson, Marc; Ellis, David; Sanzi, James

    2013-01-01

    The Fission Power System (FPS) Technology Demonstration Unit (TDU) consists of a pumped sodiumpotassium (NaK) loop that provides heat to a Stirling Power Conversion Unit (PCU), which converts some of that heat into electricity and rejects the waste heat to a pumped water loop. Each of the TDU subsystems is being tested independently prior to full system testing at the NASA Glenn Research Center. The pumped NaK loop is being tested at NASA Marshall Space Flight Center; the Stirling PCU and electrical controller are being tested by Sunpower Inc.; and the pumped water loop is being tested at Glenn. This paper describes cold-end subsystem setup and testing at Glenn. The TDU cold end has been assembled in Vacuum Facility 6 (VF 6) at Glenn, the same chamber that will be used for TDU testing. Cold-end testing in VF 6 will demonstrate functionality; validated coldend fill, drain, and emergency backup systems; and generated pump performance and system pressure drop data used to validate models. In addition, a low-cost proof-of concept radiator has been built and tested at Glenn, validating the design and demonstrating the feasibility of using low-cost metal radiators as an alternative to highcost composite radiators in an end-to-end TDU test.

  2. Cold-end Subsystem Testing for the Fission Power System Technology Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Briggs, Maxwell; Gibson, Marc; Ellis, David; Sanzi, James

    2013-01-01

    The Fission Power System (FPS) Technology Demonstration Unit (TDU) consists of a pumped sodium-potassium (NaK) loop that provides heat to a Stirling Power Conversion Unit (PCU), which converts some of that heat into electricity and rejects the waste heat to a pumped water loop. Each of the TDU subsystems is being tested independently prior to full system testing at the NASA Glenn Research Center. The pumped NaK loop is being tested at NASA Marshall Space Flight Center; the Stirling PCU and electrical controller are being tested by Sunpower Inc.; and the pumped water loop is being tested at Glenn. This paper describes cold-end subsystem setup and testing at Glenn. The TDU cold end has been assembled in Vacuum Facility 6 (VF 6) at Glenn, the same chamber that will be used for TDU testing. Cold-end testing in VF 6 will demonstrate functionality; validated cold-end fill, drain, and emergency backup systems; and generated pump performance and system pressure drop data used to validate models. In addition, a low-cost proof-of concept radiator has been built and tested at Glenn, validating the design and demonstrating the feasibility of using low-cost metal radiators as an alternative to high-cost composite radiators in an end-to-end TDU test.

  3. Project Plan: The MEDARP Documentation Unit to the School Improvement and Local School Development Projects.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    The Metropolitan Educational Development and Research Project (MEDARP) Documentation Unit, located in the Office of Educational Evaluation (OEE) at the New York City Board of Education, is funded by the Ford Foundation to document, evaluate and provide technical assistance to the School Improvement and Local School Development Projects; these are…

  4. Advanced secondary recovery project for the Sooner D Sand Unit, Weld County, Colorado: Final report

    SciTech Connect

    Sippel, M.A.; Cammon, T.J.

    1986-06-01

    The objective of this project was to increase production at the Sooner D Sand Unit through geologically targeted infill drilling and improved reservoir management of waterflood operations. The Sooner D Sand Unit demonstration project should be an example for other operators to follow for reservoir characterization and exploitation methodologies to increase production by waterflood from the Cretaceous D Sandstone in the Denver-Julesburg (D-J) Basin. This project involved multi-disciplinary reservoir characterization using high-density 3D seismic, detailed stratigraphy and reservoir simulation studies. Infill drilling, water-injection conversion and re-completing some wells to add short-radius laterals were based on the results of the reservoir characterization studies. Production response were evaluated using reservoir simulation and production tests. Technology transfer utilized workshops, presentations and technical papers which emphasized the economic advantages of implementing the demonstrated technologies.

  5. Final Report of the Adult Competency Education Project. An Experimental Adult Basic Education Demonstration Project.

    ERIC Educational Resources Information Center

    San Mateo County Office of Education, Redwood City, CA. Career Preparation Centers.

    The Adult Competency Education (ACE) Project sought to define basic job-related skills and tasks for the development of instructional programs. The programs included a vocational counseling component to assist students in establishing skills needed to increase employability. In phase 1 the 100 entry-level jobs most frequently occurring in San…

  6. Project Assist: A Counseling, Communication and Instruction Program Manual. Title VII Demonstration Project 1981-1984.

    ERIC Educational Resources Information Center

    Ocean View School District, Oxnard, CA.

    The goals of Project Assist in the Ocean View School District (California) are to socialize sixth through eighth grade recent immigrant and other limited English proficient students into the school mainstream and to aid them in passing eigth grade competency tests in basic skills of English reading, written composition, and mathematics. The…

  7. Project A+ Elementary Technology Demonstration Schools 1990-91. The First Year.

    ERIC Educational Resources Information Center

    Marable, Paula; Frazer, Linda

    Project A+ Elementary Technology Demonstration Schools is a program made possible through grants from IBM (International Business Machines Corporation) and Apple, Inc. The primary purpose of the program is to demonstrate the educational effectiveness of technology in accelerating the learning of low achieving at-risk students and enhancing the…

  8. 76 FR 12507 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ... 2011. On September 9, 2010, DoD published the proposed STRL Demonstration Project for TARDEC in 75 FR... March 7, 2011 Part III Department of Defense Science and Technology Reinvention Laboratory Personnel... Secretary Science and Technology Reinvention Laboratory Personnel Management Demonstration...

  9. The Use of Surveys in a Responsive Evaluation: Evaluation of a National Sex Equity Demonstration Project.

    ERIC Educational Resources Information Center

    Stake, Bernadine Evans; And Others

    During the last 2 years (1980-82), selected schools in the Broward County School District in Florida participated in the National Sex Equity Demonstration Project (NSEDP) to create a model for demonstration of curricular materials, educational practices, and program arrangements that feature gender-fair instruction and associated educational…

  10. Heber Geothermal Binary Demonstration Project. Quarterly technical progress report, September 15, 1980-March 31, 1981

    SciTech Connect

    Hanenburg, W.H.; Lacy, R.G.; Van De Mark, G.D.

    1981-06-01

    Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of September 15, 1980, through March 31, 1981 is documented. Topics covered in this quarterly report include progress made in the areas of Wells and Fluids Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  11. A Demonstration Project: Group Care of Infants and Toddlers. Final Report.

    ERIC Educational Resources Information Center

    North Carolina Univ., Greensboro.

    This research and demonstration project involved the establishment of a demonstration Nursery Center to provide for the daytime care of infants and toddlers in groups and for the evaluation of this experience. A descriptive account is given of the founding of the center and of its operation over a three-year period. Finding housing and suitable…

  12. Thermo-physical performance prediction of the KSC Ground Operation Demonstration Unit for liquid hydrogen

    NASA Astrophysics Data System (ADS)

    Baik, J. H.; Notardonato, W. U.; Karng, S. W.; Oh, I.

    2015-12-01

    NASA Kennedy Space Center (KSC) researchers have been working on enhanced and modernized cryogenic liquid propellant handling techniques to reduce life cycle costs of propellant management system for the unique KSC application. The KSC Ground Operation Demonstration Unit (GODU) for liquid hydrogen (LH2) plans to demonstrate integrated refrigeration, zero-loss flexible term storage of LH2, and densified hydrogen handling techniques. The Florida Solar Energy Center (FSEC) has partnered with the KSC researchers to develop thermal performance prediction model of the GODU for LH2. The model includes integrated refrigeration cooling performance, thermal losses in the tank and distribution lines, transient system characteristics during chilling and loading, and long term steady-state propellant storage. This paper will discuss recent experimental data of the GODU for LH2 system and modeling results.

  13. The implementation of the Human Exploration Demonstration Project (HEDP), a systems technology testbed

    NASA Technical Reports Server (NTRS)

    Rosen, Robert; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the NASA's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment consists of life support systems, physiological monitoring of project crew, a virtual environment work station, and centralized data acquisition and habitat systems health monitoring. The HEDP is an integrated technology demonstrator, as well as an initial operational testbed. There are several robotic systems operational in a simulated planetary landscape external to the habitat environment, to provide representative work loads for the crew. This paper describes the evolution of the HEDP from initial concept to operational project; the status of the HEDP after two years; the final facilities composing the HEDP; the project's role as a NASA Ames Research Center systems technology testbed; and the interim demonstration scenarios that have been run to feature the developing technologies in 1993.

  14. Demonstrating artificial intelligence for space systems - Integration and project management issues

    NASA Technical Reports Server (NTRS)

    Hack, Edmund C.; Difilippo, Denise M.

    1990-01-01

    As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

  15. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D.; Severinghaus, W.D.; Brent, J.J.

    1989-04-01

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers` Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA`s barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely.

  16. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D. . Energy Systems Div.); Severinghaus, W.D. ); Brent, J.J. )

    1989-04-01

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers' Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA's barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely.

  17. DOE Project 353: TAMS Prototype and production coupling alignment units

    SciTech Connect

    Field, K.V.

    1996-02-01

    TAMS is an electronic measurement system used to determine the alignment of turbine-generator shafts at the coupling interface. The displacement transducer is a strain gage based sensor mounted in a portable probe. The measurement system was experiencing zero input drift and temperature induced drift. This project endeavored to determine the source of these problems and to revise a unit to be returned to a customer, Baltimore Gas and Electric (BGE), within a period of five weeks.

  18. LARGE-SCALE DEMONSTRATION AND DEPLOYMENT PROJECT-TECHNOLOGY INFORMATION SYSTEM (LSDDP-TIS)

    SciTech Connect

    M.A. Ebadian, Ph.D.

    1999-01-01

    In recent years, an increasing demand for remediation technologies has fueled rapid growth in the D&D technologies. The D&D project managers are now faced with the task of selecting from among the many commercially available and innovative technologies, the most appropriate technology, or combination of technologies, that will address their specific D&D needs. The DOE's Office of Science and Technology (OST) sponsored the Large-Scale Demonstration and Deployment Projects (LSDDP) to demonstrate improved and innovative technologies that are potentially beneficial to DOE's environmental project. To date, three LSDDPS have been conducted at DOE's nuclear production and research facilities at the Fernald Environmental Management Project--Plant-1 (FEMP), Chicago Pile-5 Research Reactor (CP-5), and Hanford Production Reactor 105-C, Now four new LSDDPS have been launched at the Los Alamos National Laboratory (LANL), Idaho National Engineering and Environmental Laboratory (INEEL), Savannah River Site (SRS), and Mound Environmental Management Project (MEMP). In the LSDDPS, an extensive search is first conducted to identify candidate technologies that can potentially address the identified problems The candidate technologies then go through a screening process to select those technologies with the best potential for addressing remediation problems at the LSDDP site as well as project sites across the DOE complex. This selection process can be overwhelming and time-consuming. The result is that D&D project managers for the new LSDDPS are challenged to avoid duplication of demonstrated technologies.

  19. 8 CFR 245.22 - Evidence to demonstrate an alien's physical presence in the United States on a specific date.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... presence in the United States on a specific date. 245.22 Section 245.22 Aliens and Nationality DEPARTMENT... PERMANENT RESIDENCE § 245.22 Evidence to demonstrate an alien's physical presence in the United States on a... presence in the United States on a specific date in connection with an application to adjust status to...

  20. 8 CFR 1245.22 - Evidence to demonstrate an alien's physical presence in the United States on a specific date.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... presence in the United States on a specific date. 1245.22 Section 1245.22 Aliens and Nationality EXECUTIVE... presence in the United States on a specific date. (a) Evidence. Generally, an alien who is required to demonstrate his or her physical presence in the United States on a specific date in connection with...

  1. STUDY OF HOME DEMONSTRATION UNITS IN A SAMPLE OF 27 COUNTIES IN NEW YORK STATE, NUMBER 3.

    ERIC Educational Resources Information Center

    ALEXANDER, FRANK D.; HARSHAW, JEAN

    AN EXPLORATORY STUDY EXAMINED CHARACTERISTICS OF 1,128 HOME DEMONSTRATION UNITS TO SUGGEST HYPOTHESES AND SCOPE FOR A MORE INTENSIVE STUDY OF A SMALL SAMPLE OF UNITS, AND TO PROVIDE GUIDANCE IN SAMPLING. DATA WERE OBTAINED FROM A SPECIALLY DESIGNED MEMBERSHIP CARD USED IN 1962. UNIT SIZE AVERAGED 23.6 MEMBERS BUT THE RANGE WAS FAIRLY GREAT. A NEED…

  2. Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project

    SciTech Connect

    Sheppy, M.; Metzger, I.; Cutler, D.; Holland, G.; Hanada, A.

    2014-01-01

    As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

  3. Pacific Northwest GridWise™ Testbed Demonstration Projects; Part I. Olympic Peninsula Project

    SciTech Connect

    Hammerstrom, Donald J.; Ambrosio, Ron; Carlon, Teresa A.; DeSteese, John G.; Horst, Gale R.; Kajfasz, Robert; Kiesling, Laura L.; Michie, Preston; Pratt, Robert G.; Yao, Mark; Brous, Jerry; Chassin, David P.; Guttromson, Ross T.; Jarvegren, Olof M.; Katipamula, Srinivas; Le, N. T.; Oliver, Terry V.; Thompson, Sandra E.

    2008-01-09

    This report describes the implementation and results of a field demonstration wherein residential electric water heaters and thermostats, commercial building space conditioning, municipal water pump loads, and several distributed generators were coordinated to manage constrained feeder electrical distribution through the two-way communication of load status and electric price signals. The field demonstration took place in Washington and Oregon and was paid for by the U.S. Department of Energy and several northwest utilities. Price is found to be an effective control signal for managing transmission or distribution congestion. Real-time signals at 5-minute intervals are shown to shift controlled load in time. The behaviors of customers and their responses under fixed, time-of-use, and real-time price contracts are compared. Peak loads are effectively reduced on the experimental feeder. A novel application of portfolio theory is applied to the selection of an optimal mix of customer contract types.

  4. Social work in primary care: a demonstration student unit utilizing practice research.

    PubMed

    Rock, B D; Cooper, M

    2000-01-01

    A neighborhood primary health care program serving a socially and economically oppressed community, and a graduate school of social work have collaborated to create a social work student field work unit in a primary health care setting, to demonstrate emerging and innovative social work roles in an ever-increasing managed care environment. Patients with high levels of psychosocial stress make large demands on the primary care system and consume considerable laboratory and diagnostic treatment resources. Development of social services in primary care settings is a relatively new concept, however it has been clearly demonstrated that primary care physicians need the skills of social workers to handle the psychosocial and environmental aspects of illness. The principal goal was to demonstrate social work practice in a primary care health setting, utilizing practice research approaches. Validation of effectiveness was noted, as depression, anxiety, adjustment reactions (to name a few) were decreased, resulting in fewer physician visits, less somatization and improved compliance with medical and diet/nutrition regimens. The case examples and single subject data presented provide qualitative evidence, in the context of a natural experiment, for the profession to pursue this model further in both program development and research. PMID:10989871

  5. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    SciTech Connect

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  6. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    SciTech Connect

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  7. Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

    SciTech Connect

    Tuenge, Jason R.

    2011-06-01

    The U.S. Department of Energy (DOE) is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service (NPS) views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other NPS tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr for this tunnel to a much larger figure national

  8. Wisconsin electric and hybrid vehicle demonstration project. Final report, 1981-1985

    SciTech Connect

    Not Available

    1986-02-10

    In 1981, the Wisconsin Board of Vocational, Technical and Adult Education (WBVTAE) was selected by the US Department of Energy for participation in the National Electric and Hybrid Vehicle Demonstration Program. On September 30, 1985, the data collection phase of the project was completed. The project was to purchase ten (10) electric vehicles and assign five (5) to Northeast Wisconsin Technical Institute (NWTI) in Green Bay and five (5) vehicles to the Madison Area Technical College.

  9. Stakeholder views on financing carbon capture and storage demonstration projects in China.

    PubMed

    Reiner, David; Liang, Xi

    2012-01-17

    Chinese stakeholders (131) from 68 key institutions in 27 provinces were consulted in spring 2009 in an online survey of their perceptions of the barriers and opportunities in financing large-scale carbon dioxide capture and storage (CCS) demonstration projects in China. The online survey was supplemented by 31 follow-up face-to-face interviews. The National Development and Reform Commission (NDRC) was widely perceived as the most important institution in authorizing the first commercial-scale CCS demonstration project and authorization was viewed as more similar to that for a power project than a chemicals project. There were disagreements, however, on the appropriate size for a demonstration plant, the type of capture, and the type of storage. Most stakeholders believed that the international image of the Chinese Government could benefit from demonstrating commercial CCS and that such a project could also create advantages for Chinese companies investing in CCS technologies. In more detailed interviews with 16 financial officials, we found striking disagreements over the perceived risks of demonstrating CCS. The rate of return seen as appropriate for financing demonstration projects was split between stakeholders from development banks (who supported a rate of 5-8%) and those from commercial banks (12-20%). The divergence on rate alone could result in as much as a 40% difference in the cost of CO(2) abatement and 56% higher levelized cost of electricity based on a hypothetical case study of a typical 600-MW new build ultrasupercritical pulverized coal-fired (USCPC) power plant. To finance the extra operational costs, there were sharp divisions over which institutions should bear the brunt of financing although, overall, more than half of the support was expected to come from foreign and Chinese governments. PMID:22191735

  10. Development and Evaluation of the Habitat Demonstration Unit Medical Operations Workstation and Opportunities for Future Research

    NASA Technical Reports Server (NTRS)

    Howard, Robert L., Jr.

    2012-01-01

    As NASA develops missions to leave Earth orbit and explore distant destinations (Mars, Moon, Asteroids) it is necessary to rethink human spaceflight paradigms in the life sciences. Standards developed for low earth orbit human spaceflight may not be fully applicable and in-space research may be required to develop new standards. Preventative and emergency medical care may require new capabilities never before used in space. Due to spacecraft volume limitations, this work area may also be shared with various animal and plant life science research. This paper explores the prototype Medical Operations Workstation within the NASA Habitat Demonstration Unit and discusses some of the lessons learned from field analogue missions involving the workstation. Keywords: Exploration, medical, health, crew, injury emergency, biology, animal, plant, science, preventative, emergency.

  11. Green Propellant Demonstration with Hydrazine Catalyst of F-16 Emergency Power Unit

    NASA Technical Reports Server (NTRS)

    Robinson, Joel W.; Brechbill, Shawn

    2015-01-01

    Some space vehicle and aircraft Auxiliary Power Units (APUs) use hydrazine propellant for generating power. Hydrazine is a toxic, hazardous fuel which requires special safety equipment and processes for handling and loading. In recent years, there has been development of two green propellants that could enable their use in APU's: the Swedish LMP-103S and the Air Force Research Laboratory (AFRL) AF-M315E. While there has been work on development of these propellants for thruster applications (Prisma and Green Propulsion Infusion Mission, respectively), there has been less focus on the application to power units. Beginning in 2012, an effort was started by the Marshall Space Flight Center (MSFC) on the APU application. The MSFC plan was to demonstrate green propellants with residual Space Shuttle hardware. The principal investigator was able to acquire a Solid Rocket Booster gas generator and an Orbiter APU. Since these test assets were limited in number, an Air Force equivalent asset was identified: the F-16 Emergency Power Unit (EPU). In June 2013, two EPU's were acquired from retired aircraft located at Davis Monthan Air Force Base. A gas generator from one of these EPU's was taken out of an assembly and configured for testing with a version of the USAF propellant with a higher water content (AF-M315EM) to reduce decomposition temperatures. Testing in November 2014 has shown that this green propellant is reactive with the Hydrazine catalyst (Shell 405) generating 300 psi of pressure with the existing F-16 EPU configuration. This paper will highlight the results of MSFC testing in collaboration with AFRL.

  12. Design of unit cells and demonstration of methods for synthesizing Huygens metasurfaces

    NASA Astrophysics Data System (ADS)

    Wong, Joseph P. S.; Selvanayagam, Michael; Eleftheriades, George V.

    2014-08-01

    The systematic design of unit cells for a Huygens metasurface, a particular class of metasurface, is presented here. The design of these unit cells uses transmission-line theory. This is validated through application to 1D refraction and Gaussian-to-Gaussian beam focusing. The 1D refraction is further validated experimentally. These applications demonstrate the practical utility of these Huygens metasurfaces. The Huygens metasurfaces presented here are printed on two bonded boards instead of many stacked, interspaced layers. This simplifies fabrication and enables the scaling down of the metasurfaces to shorter wavelengths. These two bonded boards implement a single, collocated layer of electric and magnetic dipoles. The electric and magnetic dipoles are synthesized using sub-wavelength arrays of printed elements. These printed elements can be manufactured using standard PCB fabrication techniques, and are capable of synthesizing the full range of impedances required. Furthermore, in contrast to frequency-selective surfaces (FSSs) and traditional transmitarrays, which are on the order of a wavelength thick, these designs are only λ/10 thick while incurring minimum reflections losses.

  13. Operation Evaluation of the VEGGIE Food Production System in the Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Stutte, Gary W.; Newsham, Gerard; Morrow, Robert M.; Wheeler, Raymond M.

    2011-01-01

    The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSantm as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

  14. Operational Evaluation of VEGGIE Food Production System in the Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Stutte, Gary W.; Newsham, Gerard; Morrow, Robert M.; Wheeler, Raymond M.

    2011-01-01

    The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSan(tm) as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

  15. ULTRA-CLEAN FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT

    SciTech Connect

    Steve Bergin

    2004-10-18

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: SFP Construction and Fuel Production, Impact of SFP Fuel on Engine Performance, Fleet Testing at WMATA and Denali National Park, Demonstration of Clean Diesel Fuels in Diesel Electric Generators in Alaska, and Economic Analysis. ICRC provided overall project organization and budget management for the project. ICRC held meetings with various project participants. ICRC presented at the Department of Energy's annual project review meeting. The plant began producing fuel in October 2004. The first delivery of finished fuel was made in March of 2004 after the initial start-up period.

  16. Development of analytical cell support for vitrification at the West Valley Demonstration Project. Topical report

    SciTech Connect

    Barber, F.H.; Borek, T.T.; Christopher, J.Z.

    1997-12-01

    Analytical and Process Chemistry (A&PC) support is essential to the high-level waste vitrification campaign at the West Valley Demonstration Project (WVDP). A&PC characterizes the waste, providing information necessary to formulate the recipe for the target radioactive glass product. High-level waste (HLW) samples are prepared and analyzed in the analytical cells (ACs) and Sample Storage Cell (SSC) on the third floor of the main plant. The high levels of radioactivity in the samples require handling them in the shielded cells with remote manipulators. The analytical hot cells and third floor laboratories were refurbished to ensure optimal uninterrupted operation during the vitrification campaign. New and modified instrumentation, tools, sample preparation and analysis techniques, and equipment and training were required for A&PC to support vitrification. Analytical Cell Mockup Units (ACMUs) were designed to facilitate method development, scientist and technician training, and planning for analytical process flow. The ACMUs were fabricated and installed to simulate the analytical cell environment and dimensions. New techniques, equipment, and tools could be evaluated m in the ACMUs without the consequences of generating or handling radioactive waste. Tools were fabricated, handling and disposal of wastes was addressed, and spatial arrangements for equipment were refined. As a result of the work at the ACMUs the remote preparation and analysis methods and the equipment and tools were ready for installation into the ACs and SSC m in July 1995. Before use m in the hot cells, all remote methods had been validated and four to eight technicians were trained on each. Fine tuning of the procedures has been ongoing at the ACs based on input from A&PC technicians. Working at the ACs presents greater challenges than had development at the ACMUs. The ACMU work and further refinements m in the ACs have resulted m in a reduction m in analysis turnaround time (TAT).

  17. 75 FR 39213 - Extension of Provider Reimbursement Demonstration Project for the State of Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... the State of Alaska, with an effective date of January 1, 2007 (71 FR 67113), to set payment rates for... extension (74 FR 67179) that extended the demonstration through December 31, 2010. The DoD has determined... provided in 10 United States Code 1092. Dated: July 2, 2010. Mitchell S. Bryman, Alternate OSD...

  18. Clean Coal Technology III: 10 MW Demonstration of Gas Suspension Absorption final project performance and economics report

    SciTech Connect

    Hsu, F.E.

    1995-08-01

    The 10 MW Demonstration of the Gas Suspension Absorption (GSA) program is a government and industry co-funded technology development. The objective of the project is to demonstrate the performance of the GSA system in treating a 10 MW slipstream of flue gas resulting from the combustion of a high sulfur coal. This project involves design, fabrication, construction and testing of the GSA system. The Project Performance and Economics Report provides the nonproprietary information for the ``10 MW Demonstration of the Gas Suspension Absorption (GSA) Project`` installed at Tennessee Valley Authority`s (TVA) Shawnee Power Station, Center for Emissions Research (CER) at Paducah, Kentucky. The program demonstrated that the GSA flue-gas-desulfurization (FGD) technology is capable of achieving high SO{sub 2} removal efficiencies (greater than 90%), while maintaining particulate emissions below the New Source Performance Standards (NSPS), without any negative environmental impact (section 6). A 28-day test demonstrated the reliability and operability of the GSA system during continuous operation. The test results and detailed discussions of the test data can be obtained from TVA`s Final Report (Appendix A). The Air Toxics Report (Appendix B), prepared by Energy and Environmental Research Corporation (EERC) characterizes air toxic emissions of selected hazardous air pollutants (HAP) from the GSA process. The results of this testing show that the GSA system can substantially reduce the emission of these HAP. With its lower capital costs and maintenance costs (section 7), as compared to conventional semi-dry scrubbers, the GSA technology commands a high potential for further commercialization in the United States. For detailed information refer to The Economic Evaluation Report (Appendix C) prepared by Raytheon Engineers and Constructors.

  19. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect

    White, T.; Contos, L.; Adams, L. . Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  20. Ultra-Clean Fischer-Tropsch Fuels Production and Demonstration Project

    SciTech Connect

    Steve Bergin

    2005-10-14

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: Dynamometer Durability Testing, the Denali Bus Fleet Demonstration, Bus Fleet Demonstrations Emissions Analysis, Impact of SFP Fuel on Engine Performance, Emissions Analysis, Feasibility Study of SFPs for Rural Alaska, and Cold Weather Testing of Ultra Clean Fuel.

  1. Development of a Ground Operations Demonstration Unit for Liquid Hydrogen at Kennedy Space Center

    NASA Astrophysics Data System (ADS)

    Notardonato, W. U.

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project will design, assemble, and test a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives and will culminate with an operational demonstration of the loading of a simulated flight tank with densified propellants. The system will be unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. The integrated refrigerator is the critical feature enabling the testing of the following three functions: zero-loss storage and transfer, propellant densification/conditioning, and on-site liquefaction. This paper will discuss the test objectives, the design of the system, and the current status of the installation.

  2. Cummins Engine Company B5.9 Propane Engine Development, Certification, and Demonstration Project

    SciTech Connect

    The ADEPT Group, Inc.

    1998-12-18

    The objective of this project was to successfuly develop and certify an LPG-dedicated medium-duty original equipment manufacturer (OEM) engine that could be put into production. The engine was launched into production in 1994, and more than 800 B5.9G engines are now in service in the United States and abroad. This engine is now offered by more than 30 bus and truck OEMs.

  3. X-38 Prototype Technology Demonstrator for the Crew Return Vehicle (CRV) and Project Managers Bob Ba

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Bob Baron of the Dryden Flight Research Center (left) and Brian Anderson of the Johnson Space Flight Center (right) flank an X-38 prototype Crew Return Vehicle technology demonstrator under construction at the Johnson Space Center, Houston, Texas. The X-38 Crew Return Vehicle (CRV) research project is designed to develop the technology for a prototype emergency crew return vehicle, or lifeboat, for the International Space Station. The project is also intended to develop a crew return vehicle design that could be modified for other uses, such as a joint U.S. and international human spacecraft that could be launched on the French Ariane-5 Booster. The X-38 project is using available technology and off-the-shelf equipment to significantly decrease development costs. Original estimates to develop a capsule-type crew return vehicle were estimated at more than $2 billion. X-38 project officials have estimated that development costs for the X-38 concept will be approximately one quarter of the original estimate. Off-the-shelf technology is not necessarily 'old' technology. Many of the technologies being used in the X-38 project have never before been applied to a human-flight spacecraft. For example, the X-38 flight computer is commercial equipment currently used in aircraft and the flight software operating system is a commercial system already in use in many aerospace applications. The video equipment for the X-38 is existing equipment, some of which has already flown on the space shuttle for previous NASA experiments. The X-38's primary navigational equipment, the Inertial Navigation System/Global Positioning System, is a unit already in use on Navy fighters. The X-38 electromechanical actuators come from previous joint NASA, U.S. Air Force, and U.S. Navy research and development projects. Finally, an existing special coating developed by NASA will be used on the X-38 thermal tiles to make them more durable than those used on the space shuttles. The X-38 itself was an

  4. Final Evaluation and Monitoring Report of Demonstration Project for Adult Education "Mobilizing Adult Basic Education".

    ERIC Educational Resources Information Center

    Harris, Dolores M.

    A demonstration adult education project aimed at a rural New Jersey population and involving class sessions 1 evening per week at 6 sites (N=85 students, including 65 caucasians, 10 blacks, and 10 Hispanic) was evaluated in terms of compliance, process, and performance. Compliance monitoring included examination of: visitations; budget; staff…

  5. Secondary Schools Demonstration Project: Program Effects of School-Based Interventions on Antisocial Behaviour

    ERIC Educational Resources Information Center

    Wright, Robin; Offord, David; John, Lindsay; Duku, Eric; DeWit, David

    2005-01-01

    This article describes the methodology and program effects of the Secondary Schools Demonstration Project (SSDP) conducted in four Ontario schools. The objective of the study was to evaluate the extent to which a universal program model of three interventions--cooperative learning; classroom management; and peer-helping approaches that included…

  6. The School Attendance Demonstration Project: Impact Analysis Using an Experimental and Longitudinal Research Design.

    ERIC Educational Resources Information Center

    Harris, Ronald A.

    The School Attendance Demonstration Project (SADP) was designed to improve school attendance among teenagers receiving Aid to Families with Dependent Children (AFDC) benefits in San Diego County, California. An impact study was conducted from March 10, 1996 to March 10, 1998, to evaluate the effects of providing social services and imposing…

  7. 77 FR 19682 - Proposed Information Collection; Wolf Livestock Demonstration Project Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... Fish and Wildlife Service Proposed Information Collection; Wolf Livestock Demonstration Project Grant... the Secretary of the Interior and the Secretary of Agriculture to develop a Wolf Livestock... activities to reduce the risk of livestock loss due to predation by wolves; and Compensate...

  8. 78 FR 67182 - Announcement of Funding Awards for the Section 811 Project Rental Assistance Demonstration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...In accordance with section 102 (a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of funding decisions made by the Department in a competition for funding under the Notice of Funding Availability (NOFA) for the Section 811 Project Rental Assistance Demonstration Program. This announcement contains the names of the awardees and......

  9. DEMONSTRATION PROJECTS UNDER THE U.S. EPA SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) is engaged in an initiative called the Superfund Innovative Technology Evaluation (SITE) program. his program offers a mechanism for conducting joint technology demonstration/evaluation projects between the private sector and EPA. he...

  10. 78 FR 32637 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... notice, published on December 29, 2009 (74 FR 68936-68966). SUMMARY: Section 342(b) of the National... demonstration project was published in the Federal Register on December 29, 2009 (74 FR 68936- 68966). The ECBC....37 (available at http://www.dtic.mil/whs/directives/corres/pdf/140037p.pdf ); 73 FR...

  11. The Outreach Sourcebook, Volume 5: Rural Health Demonstration Projects, 1995 to 1998.

    ERIC Educational Resources Information Center

    Randall, Teri

    In 1995, the federal Office of Rural Health Policy awarded 3-year outreach demonstration grants to 25 projects to provide direct primary and preventive health care services to rural residents in 20 states. The grant program allows recipients to test innovative ideas against persistent problems of rural health care, such as provider shortages,…

  12. INSTRUCTIONAL SYSTEMS DEVELOPMENT--A DEMONSTRATION AND EVALUATION PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    BARSON, JOHN

    FOUR UNIVERSITIES COOPERATED WITH THE INSTRUCTIONAL MEDIA CENTER AT MICHIGAN STATE UNIVERSITY TO TEST, DEMONSTRATE, AND REFINE A MODEL FOR MEDIA INNOVATION AND INSTRUCTIONAL DEVELOPMENT WHICH HAD BEEN DESIGNED IN A EARLIER PROJECT. MEDIA, EVALUATIVE, AND INSTRUCTIONAL SPECIALIST CAPABILITIES WERE TEAMED TO THE DECISION PROCESSES OF THE INSTRUCTORS…

  13. ESL Workplace Literacy Curriculum for a JTPA/Family English Literacy Demonstration Project.

    ERIC Educational Resources Information Center

    Saumweber, Judy; And Others

    A JTPA/FEL (Job Training Partnership Act/Family English Literacy) demonstration project is reported that involves a partnership between the Lao Family Community (LFC) of Minnesota, the City of St. Paul, and St. Paul Public Schools/Adult Basic Education. The goal is to provide workplace literacy instruction to refugees with limited English…

  14. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs.

  15. 20 CFR 670.560 - Is Job Corps authorized to conduct pilot and demonstration projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Is Job Corps authorized to conduct pilot and demonstration projects? 670.560 Section 670.560 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Program Activities and...

  16. 78 FR 73559 - Renewal of Agency Information Collection for Reporting Systems for Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... of 1992 (as amended) Demonstration Project authorized by OMB Control Number 1076-0135. This... collection conducted under OMB Control Number 1076-0135, Reporting System for Indian Employment, Training... public review, we cannot guarantee that we will be able to do so. III. Data OMB Control Number:...

  17. 78 FR 57623 - TRICARE Over-the-Counter Drug Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    .... On June 15, 2007, the Department of Defense published a notice in the Federal Register (FR) (72 FR..., the Department published a notice in the FR (74 FR 66626- 66627) on December 16, 2009 that extended... of the Secretary TRICARE Over-the-Counter Drug Demonstration Project AGENCY: Office of the...

  18. The Outreach Sourcebook, Volume 7: Rural Health Demonstration Projects, 1997 to 2000.

    ERIC Educational Resources Information Center

    Health Resources and Services Administration (DHHS), Rockville, MD. Office of Rural Health Policy.

    In 1997, the federal Office of Rural Health Policy awarded 3-year outreach demonstration grants to 45 projects to provide direct primary and preventive health care services to rural residents in 28 states. The grant program allows recipients to test innovative ideas against the challenges of rural health care delivery, such as provider shortages,…

  19. 78 FR 60887 - Expressions of Interest (EOI) for Chemical Defense Demonstration Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... preparedness of their emergency management, first responder, and first receiver groups with the knowledge... cities in order to gain input in the demonstration projects (e.g. emergency medical services, fire/hazmat.... Selected SLTT government agencies must work cooperatively with DHS OHA CDP with all phases of...

  20. INITIAL TEST RESULTS OF THE LIMESTONE INJECTION MULTISTAGE BURNER (LIMB) DEMONSTRATION PROJECT

    EPA Science Inventory

    The paper discusses SO2 removal efficiency and low-NOx burner performance obtained during short term tests, as well as the impact of LIMB ash on electrostatic precipitator (ESP) performance at Ohio Edison's Edgewater Station. Project goals are to demonstrate 50% or more SO2 remov...

  1. Research and Demonstration Projects: Programs for Gifted, January 1990-1991.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Special Education.

    Thirteen research and demonstration projects developed by Ohio school districts for the education of gifted students are described. The programs involve inservice teacher education; interdepartmental teamwork; collaboration with community and university resources; a continuum of services for gifted children in regular classrooms; learning options…

  2. Together is Best: Families and Schools. Findings of the Parent Education Demonstration Project in Region IV.

    ERIC Educational Resources Information Center

    Southern Association of Colleges and Schools, Atlanta, GA.

    The purpose of this first year report of the Region IV Parent Education Demonstration Project (PEDP) is to help other school systems as they plan and conduct parent/child programs. The Region IV PEDP involved 29 local school systems which were conducting 31 parent education programs through various funding sources. These parent programs had as one…

  3. A PLANNED COMMUNITY FOR MIGRATORY FARM WORKERS--A PROPOSAL FOR A DEMONSTRATION PROJECT.

    ERIC Educational Resources Information Center

    PEERY, A.B.

    A DEMONSTRATION PROJECT FOR MIGRATORY FARM LABORERS HOME-BASED IN SOUTH TEXAS IS PROPOSED. THE PURPOSE IS TO DESIGN A PLANNED COMMUNITY CONTAINING HOUSING, HEALTH FACILITIES, ORIENTATION AND EDUCATIONAL FACILITIES, JOB-PLACEMENT FACILITIES, AND SOCIAL, RECREATIONAL, AND COMMERCIAL FACILITIES. THE PLANNED COMMUNITY WOULD PROVIDE SAFE, SANITARY, AND…

  4. Reaching Out to Older Veterans in Need: The Elko Clinic Demonstration Project

    ERIC Educational Resources Information Center

    Juretic, Meghan; Hill, Robert; Luptak, Marilyn; Rupper, Randall; Bair, Byron; Floyd, James; Westfield, Brian; Dailey, Nancy K.

    2010-01-01

    Context: The challenge of providing meaningful health care services to veterans living in rural communities is a major public health concern that involves redefining the traditional facility-based model of care delivery employed in urban areas. Purpose: This paper describes the steps of a demonstration project, the Elko Telehealth Outreach Clinic.…

  5. 78 FR 33051 - Non-Rock Alternatives to Shoreline Protection Demonstration Project (LA-16) Iberia, Jefferson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... Natural Resources Conservation Service Non-Rock Alternatives to Shoreline Protection Demonstration Project (LA-16) Iberia, Jefferson, and Lafourche Parishes, LA AGENCY: Natural Resources Conservation Service... Guidelines (40 CFR part 1500); and the Natural Resources Conservation Service Guidelines (7 CFR part...

  6. Participation Patterns and Program Impacts of Hawaii's JOBS WORKS! Demonstration Project.

    ERIC Educational Resources Information Center

    Olson, Jerome A.; Schexnayder, Deanna T.; O'Shea, Daniel P.

    A study of Hawaii's JOBS WORKS! waiver demonstration project determined its influence on participant self-sufficiency and receipt of Aid to Families with Dependent Children (AFDC). Hawaii received a waiver to lift the 8-week federal limitation on upfront job search, operate on less than a statewide basis, require 18 hours of work, and secure…

  7. 20 CFR 404.1717 - Demonstration project on direct payment of fees to non-attorneys.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Demonstration project on direct payment of fees to non-attorneys. (a) Section 303 of the Social Security Protection Act of 2004 (SSPA), Public Law 108-203, requires the Commissioner of Social Security (Commissioner... fees to non-attorneys. 404.1717 Section 404.1717 Employees' Benefits SOCIAL SECURITY...

  8. 20 CFR 416.1517 - Demonstration project on direct payment of fees to non-attorneys.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Demonstration project on direct payment of fees to non-attorneys. (a) Section 303 of the Social Security Protection Act of 2004 (SSPA), Public Law 108-203, requires the Commissioner of Social Security (Commissioner... fees to non-attorneys. 416.1517 Section 416.1517 Employees' Benefits SOCIAL SECURITY...

  9. Experiential Education in Boston's Pilot Schools: A Three-Year Demonstration Project. PSEED Documentation Report

    ERIC Educational Resources Information Center

    Miller, Beth M.; Tung, Rosann; Ward, Rolanda

    2008-01-01

    The Pilot schools Experiential Education Demonstration (PSEED) project was intended to deepen and embed high-quality experiential education within each participating school's academic programs. A continuation of a multiyear set of initiatives by the Barr Foundation, PSEED was an effort to unify the foundation's content area foci on arts,…

  10. Design of equipment used for high-level waste vitrification at the West Valley Demonstration Project

    SciTech Connect

    Vance, R.F.; Brill, B.A.; Carl, D.E.

    1997-06-01

    The equipment as designed, started, and operated for high-level radioactive waste vitrification at the West Valley Demonstration Project in western New York State is described. Equipment for the processes of melter feed make-up, vitrification, canister handling, and off-gas treatment are included. For each item of equipment the functional requirements, process description, and hardware descriptions are presented.

  11. Two Decades of JDAI: From Demonstration Project to National Standard. A Progress Report

    ERIC Educational Resources Information Center

    Mendel, Richard

    2009-01-01

    Launched in the 1990s by the Annie E. Casey Foundation as a five-site demonstration project, the Juvenile Detention Alternatives Initiative (JDAI) has steadily swept the country in recent years and is on track to become the standard of practice for how local justice systems nationwide handle the critical front end of the juvenile court process.…

  12. 76 FR 56406 - Science and Technology Reinvention Laboratory Demonstration Project; Department of the Army; Army...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ...On March 7, 2011 (76 FR 12508-12548), DoD published notice of approval of a personnel management demonstration project for eligible TARDEC employees. Within that notice the table showing the compensation regions defined by Normal Pay Ranges was misprinted. The Reduction-in- Force service credit was described erroneously, and several occupational series were omitted from the Occupational......

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  15. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  16. Characteristics of Young Children Exposed to Violence: The Safe Start Demonstration Project

    ERIC Educational Resources Information Center

    Kaufman, Joy S.; Ortega, Sandra; Schewe, Paul A.; Kracke, Kristen

    2011-01-01

    The Safe Start demonstration projects, funded by the Office of Juvenile Justice and Delinquency Prevention (OJJDP) under the first phase of the Safe Start initiative, are primarily designed to influence change at the systems or macrolevels to reduce the incidence of and impact of exposure to violence for children aged birth to 6 years; direct…

  17. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Experimental, pilot, and demonstration projects in the SSI program. 416.250 Section 416.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL SECURITY INCOME FOR THE AGED, BLIND, AND DISABLED Eligibility Eligibility for Increased Benefits Because of Essential Persons §...

  18. A Demonstration Project of Speech Training for the Preschool Cleft Palate Child. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Robert J.

    To ascertain the efficacy of a program of language and speech stimulation for the preschool cleft palate child, a research and demonstration project was conducted using 137 subjects (ages 18 to 72 months) with defects involving the soft palate. Their language and speech skills were matched with those of a noncleft peer group revealing that the…

  19. 20 CFR 404.1629 - Participation in research and demonstration projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Participation in research and demonstration projects. 404.1629 Section 404.1629 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE, SURVIVORS AND DISABILITY INSURANCE (1950- ) Determinations of Disability Administrative Responsibilities...

  20. Demonstration of advanced combustion NO{sub X} control techniques for a wall-fired boiler. Project performance summary, Clean Coal Technology Demonstration Program

    SciTech Connect

    2001-01-01

    The project represents a landmark assessment of the potential of low-NO{sub x} burners, advanced overtire air, and neural-network control systems to reduce NO{sub x} emissions within the bounds of acceptable dry-bottom, wall-fired boiler performance. Such boilers were targeted under the Clean Air Act Amendments of 1990 (CAAA). Testing provided valuable input to the Environmental Protection Agency ruling issued in March 1994, which set NO{sub x} emission limits for ''Group 1'' wall-fired boilers at 0.5 lb/10{sup 6} Btu to be met by January 1996. The resultant comprehensive database served to assist utilities in effectively implementing CAAA compliance. The project is part of the U.S. Department of Energy's Clean Coal Technology Demonstration Program established to address energy and environmental concerns related to coal use. Five nationally competed solicitations sought cost-shared partnerships with industry to accelerate commercialization of the most advanced coal-based power generation and pollution control technologies. The Program, valued at over $5 billion, has leveraged federal funding twofold through the resultant partnerships encompassing utilities, technology developers, state governments, and research organizations. This project was one of 16 selected in May 1988 from 55 proposals submitted in response to the Program's second solicitation. Southern Company Services, Inc. (SCS) conducted a comprehensive evaluation of the effects of Foster Wheeler Energy Corporation's (FWEC) advanced overfire air (AOFA), low-NO{sub x} burners (LNB), and LNB/AOFA on wall-fired boiler NO{sub x} emissions and other combustion parameters. SCS also evaluated the effectiveness of an advanced on-line optimization system, the Generic NO{sub x} Control Intelligent System (GNOCIS). Over a six-year period, SCS carried out testing at Georgia Power Company's 500-MWe Plant Hammond Unit 4 in Coosa, Georgia. Tests proceeded in a logical sequence using rigorous statistical analyses to

  1. 200 Sand Steamflood Demonstration Project. Sixth annual report, June 1981-June 1982

    SciTech Connect

    Alford, W.O.

    1983-08-01

    This demonstration project was initiated in the 200 Sand Pool in the Midway-Sunset Field, California Sand Pool to demonstrate the operational, recovery, and economic aspects of steamflooding a typical heavy oil reservoir which had unfavorable response to cyclic stimulation. The scope of the project involves 5 phases: (1) pilot site monitoring and evaluation; (2) pilot area expansion; (3) site selection for expansion to full-scale project; (4) expansion to full-scale steamflood; and (5) production monitoring. After expansion and steam injection for one year, the wells are averaging 8 B/D oil and 29 B/D water per well. This rate is above the 5 BOPD for cyclic stimulation. Most of the producing wells are steam stimulated about twice a year to enhance steam breakthrough from the continuous steam. The total area has averaged 319 B/D oil and 1233 B/D water the last year. 7 figures, 1 table.

  2. Advanced Coal Conversion Process Demonstration Project. Technical progress report, January 1, 1995--March 31, 1995

    SciTech Connect

    1996-06-01

    This detailed report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project. This U.S. Department of Energy (DOE) Clean Coal Technology Project demonstrates an advanced thermal coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to high-quality, low-sulfur fuel. During this reporting period, the primary focus for the project was to expand market awareness and acceptability for the products and the technology. The use of covered hopper cars has been successful and marketing efforts have focused on this technique. Operational improvements are currently aimed at developing fines marketing systems, increasing throughput capacity, decreasing operation costs, and developing standardized continuous operator training. Testburns at industrial user sites were also conducted. A detailed process description; technical progress report including facility operations/plant production, facility testing, product testing, and testburn product; and process stability report are included. 3 figs., 8 tabs.

  3. The development of the human exploration demonstration project (HEDP), a planetary systems testbed

    NASA Technical Reports Server (NTRS)

    Chevers, Edward S.; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the National Aeronautics and Space Administration's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment will consist of life support systems, physiological monitoring of project crew, a virtual environment workstation, and centralized data acquisition and habitat systems health monitoring. There will be several robotic systems on a simulated planetary landscape external to the habitat environment to provide representative work loads for the crew. This paper describes the status of the HEDP after one year, the major facilities composing the HEDP, the project's role as an Ames Research Center testbed, and the types of demonstration scenarios that will be run to showcase the technologies.

  4. 34 CFR 425.1 - What is the Demonstration Projects for the Integration of Vocational and Academic Learning Program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What is the Demonstration Projects for the Integration... EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING PROGRAM General § 425.1 What is the Demonstration Projects for the Integration of Vocational and Academic...

  5. 34 CFR 425.1 - What is the Demonstration Projects for the Integration of Vocational and Academic Learning Program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What is the Demonstration Projects for the Integration... EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING PROGRAM General § 425.1 What is the Demonstration Projects for the Integration of Vocational and Academic...

  6. 34 CFR 425.1 - What is the Demonstration Projects for the Integration of Vocational and Academic Learning Program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What is the Demonstration Projects for the Integration... EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING PROGRAM General § 425.1 What is the Demonstration Projects for the Integration of Vocational and Academic...

  7. 22 CFR 63.7 - Grants to United States participants to consult, lecture, teach, engage in research, demonstrate...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., lecture, teach, engage in research, demonstrate special skills, or engage in specialized programs. 63.7... United States participants to consult, lecture, teach, engage in research, demonstrate special skills, or... to consult, lecture, teach, engage in research, demonstrate special skills, or engage in...

  8. Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 1

    SciTech Connect

    Not Available

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3.

  9. Electric Ground Support Equipment Advanced Battery Technology Demonstration Project at the Ontario Airport

    SciTech Connect

    Tyler Gray; Jeremy Diez; Jeffrey Wishart; James Francfort

    2013-07-01

    The intent of the electric Ground Support Equipment (eGSE) demonstration is to evaluate the day-to-day vehicle performance of electric baggage tractors using two advanced battery technologies to demonstrate possible replacements for the flooded lead-acid (FLA) batteries utilized throughout the industry. These advanced battery technologies have the potential to resolve barriers to the widespread adoption of eGSE deployment. Validation testing had not previously been performed within fleet operations to determine if the performance of current advanced batteries is sufficient to withstand the duty cycle of electric baggage tractors. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. The demonstration project also grew the relationship with Southwest Airlines (SWA), our demonstration partner at Ontario International Airport (ONT), located in Ontario, California. The results of this study have encouraged a proposal for a future demonstration project with SWA.

  10. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1989 Annual report, [January 1989--December 1989

    SciTech Connect

    Not Available

    1992-02-01

    The report summarizes unit operating experience and test program progress for 1989 on Colorado-Ute Electric Association`s Nucla CFB Demonstration Program. During this period, the objectives of the Nucla Station operating group were to correct problems with refractory durability, resolve primary air fan capacity limitations, complete the high ash and high sulfur coal tests, switch to Salt Creek coal as the operating fuel, and make the unit available for testing without capacity restrictions. Each of these objectives was addressed and accomplished, to varying degrees, except for the completion of the high sulfur coal acceptance tests. (VC)

  11. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect

    White, T.; Contos, L.; Adams, L. )

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    SciTech Connect

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Klenk, David P.

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    SciTech Connect

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    SciTech Connect

    West Valley Environmental Services LLC and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner, II, Robert E.; Fox, James R.; Hoch, Jerald J.; Werchowski, Rebecca L.

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  18. LIFAC demonstration at Richmond Power and Light Whitewater Valley Unit No. 2. Final report, Volume 1 - public design

    SciTech Connect

    1998-02-01

    This report discusses the demonstration of LIFAC sorbent injection technology at Richmond Power and Light`s (RP&L) Whitewater Valley Unit No. 2 under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North American (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and several other organizations including the Electric Power Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Final Report Volume 1: Public Design is to consolidate, for public use, all design and cost information regarding the LIFAC Desulfurization Facility at the completion of construction and startup.

  19. Transit car demonstration test program on the roll dynamics unit. Volume 2. Demonstration of a transit car performance test on the roll dynamic unit. Final report

    SciTech Connect

    Arnold, G.; Nelson, S.; Cooperrider, N.K.; Law, E.H.; Fries, R.H.

    1982-02-11

    This report, Volume II, contains the results, conclusions, and recommendations of the first performance test of a transit care on the RDU. This report is limited to performance tests. The objective is to identify advantages and disadvantages of performance testing on the rollers of the RDU as highlighted by the SOAC test. The report involved separate testing, done by TTC personnel, in such traditional performance areas of transit vehicle operation ass traction, acceleration/deceleration, energy consumption, and spin/slide performance. The results of the successful performance test of a transit car on a roller unit is presented and the advantages of this method of testing is discussed. Acceleration, deceleration, spin/slide, and power consumption tests, although of limited scope in comparison to the track tests performed on the same transit car, did show the feasibility of roller testing. It is concluded that the RDU is most suited for developmental testing of transit car systems particularly for power consumption and for cars with non-standard wheel gage. Tests should be of such scope as to justify the cost of car setup on the RDU. The following two test are recommended: (1) a power consumption study for a standard/non-standard gage transit car which investigates methods of reducing power consumption and (2) a non-standard gage full performance test.

  20. Green River formation water flood demonstration project, Uinta Basin, Utah. Quarterly report, 1 October 1 1995--31 December 1995

    SciTech Connect

    Pennington, B.I.; Lomax, J.D.; Nielson, D.L.; Deo, M.D.

    1995-12-31

    The objective of this project was to apply the successful water flood technologies developed for the Monument Butte unit to other units in the vicinity. It was discovered that the unit boundaries were artificial and that an approach that considered reservoirs spanning several units was required. A comprehensive geostatistical data management and integration activity for a 12-section area around the Monument Butte unit is now underway.