Science.gov

Sample records for edison company plant

  1. Strategy for fossil plant life extension at Boston Edison Company's Mystic Unit 6: Volume 1, Summary of methodology: Final report

    SciTech Connect

    Zimbone, R.A.; Flaherty, P.A.; Guilfoyle, C.J.; Presnak, R.G.

    1987-04-01

    This report provides a summary of the evaluation results of a study conducted by the Boston Edison Company (BECo) project team at the Mystic Station. This evaluation of Unit 6 at Mystic made use of the guidelines prepared by the BECo team. These guidelines for generation planning, economic analysis, and technical assessment are provided in Volume 2 of this report. These guidelines reflect the project team expertise in the area of life extension along with the incorporation of lessons learned from the Mystic Unit 6 study. The summary provided in Volume 1 is based on detailed technical evaluations and economic evaluations provided in the following individual reports on the boiler, turbine-generator, and balance-of-plant components: Combustion Engineering, Inc., Life Extension/Cycling Study (dated January 1986); General Electric Company, Life Extension Engineering Evaluation, Operational and Component Recommendations (dated February 1986); General Electric Company, Life Extension Supplementary Data (dated February 1986); Sargent and Lundy, Fossil Plant Life Extension, Evaluation of Balance-of-Plant Components and Systems, Parts A and B (dated May 1986). These volumes are quite extensive and have been retained by BECo. Volume 1 provides a summary of the results.

  2. Metropolitan Edison Company switching and tagging procedure

    SciTech Connect

    Slater, H.J.

    1980-05-01

    Metropolitan Edison Company provides service to over 350,000 customers in an area diagonally across Southeastern Pennsylvania from North of Stroudsburg near the New York State line to the Maryland border South of Gettysburg. This area encompasses 3300 square miles, 7% of Pennsylvania, and includes all or part of 14 counties. Dispatching organization, safety factors, tagging list and switching are discussed.

  3. 75 FR 48323 - Southern California Edison Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... protests and interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov . Persons... Energy Regulatory Commission Southern California Edison Company; Notice of Filing August 4, 2010. Take...,246 (2009) (December 17, Order), Southern California Edison Company filed a compliance...

  4. Demonstration of natural gas reburn for NO{sub x} emissions reduction at Ohio Edison Company`s cyclone-fired Niles Plant Unit Number 1

    SciTech Connect

    Borio, R.W.; Lewis, R.D.; Koucky, R.W.; Lookman, A.A.; Manos, M.G.; Corfman, D.W.; Waddingham, A.L.; Johnson, S.A.

    1996-04-01

    Electric utility power plants account for about one-third of the NO{sub x} and two-thirds of the SO{sub 2} emissions in the US cyclone-fired boilers, while representing about 9% of the US coal-fired generating capacity, emit about 14% of the NO{sub x} produced by coal-fired utility boilers. Given this background, the Environmental Protection Agency, the Gas Research Institute, the Electric Power Research Institute, the Pittsburgh Energy Technology Center, and the Ohio Coal Development Office sponsored a program led by ABB Combustion Engineering, Inc. (ABB-CE) to demonstrate reburning on a cyclone-fired boiler. Ohio Edison provided Unit No. 1 at their Niles Station for the reburn demonstration along with financial assistance. The Niles Unit No. 1 reburn system was started up in September 1990. This reburn program was the first full-scale reburn system demonstration in the US. This report describes work performed during the program. The work included a review of reburn technology, aerodynamic flow model testing of reburn system design concepts, design and construction of the reburn system, parametric performance testing, long-term load dispatch testing, and boiler tube wall thickness monitoring. The report also contains a description of the Niles No. 1 host unit, a discussion of conclusions and recommendations derived from the program, tabulation of data from parametric and long-term tests, and appendices which contain additional tabulated test results.

  5. 75 FR 28604 - Southern California Edison Company; Pacific Gas and Electric Company; San Diego Gas & Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Energy Regulatory Commission Southern California Edison Company; Pacific Gas and Electric Company; San Diego Gas & Electric Company; Notice of Petition for Declaratory Order May 13, 2010. Take notice that on... and Electric Company, and San Diego Gas & Electric Company filed a Petition for Declaratory...

  6. 77 FR 5787 - Consumers Energy Company, Detroit Edison Company; Notice of Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Consumers Energy Company, Detroit Edison Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been...

  7. Performance of the Southern California Edison Company Stirling dish

    NASA Astrophysics Data System (ADS)

    Lopez, C. W.; Stone, K. W.

    1993-10-01

    McDonnell Douglas Astronautics Company (MDAC) and United Stirling AB of Sweden (USAB) formed a joint venture in 1982 to develop and produce a Stirling dish solar generating system. In this report, the six year development and testing program continued by the Southern California Edison Company (SCE) is described. Each Stirling dish module consists of a sun tracking dish concentrator developed by the MDAC and a Stirling engine driven power conversion unit (PCU) developed by USAB. The Stirling dish system demonstrated twice the peak and daily solar-to-electric conversion efficiency of any other system then under development. This system continues to set the performance standard for solar to electric systems being developed in the early 1990's. Test data are presented and used to estimate the performance of a commercial system.

  8. Performance of the Southern California Edison Company Stirling dish

    SciTech Connect

    Lopez, C.W.; Stone, K.W.

    1993-10-01

    McDonnell Douglas Astronautics Company (MDAC) and United Stirling AB of Sweden (USAB) formed a joint venture in 1982 to develop and produce a Stirling dish solar generating system. In this report, the six year development and testing program continued by the Southern California Edison Company (SCE) is described. Each Stirling dish module consists of a sun tracking dish concentrator developed by the MDAC and a Stirling engine driven power conversion unit (PCU) developed by USAB. The Stirling dish system demonstrated twice the peak and daily solar-to-electric conversion efficiency of any other system then under development. This system continues to set the performance standard for solar to electric systems being developed in the early 1990`s. Test data are presented and used to estimate the performance of a commercial system.

  9. 75 FR 10836 - Firstenergy Nuclear Operating Company, Firstenergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... environment 75 FR 6736; dated February 10, 2010. This exemption is effective upon issuance. Dated at Rockville..., the Toledo Edison Company, Beaver Valley Power Station, Unit Nos. 1 And 2; Exemption 1.0 Background... and NPF-73, which authorizes operation of the Beaver Valley Power Station, Unit Nos. 1 and 2...

  10. 63. Photocopy of photograph, no date. MAP OF POTOMAC EDISON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. Photocopy of photograph, no date. MAP OF POTOMAC EDISON COMPANY SYSTEM. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  11. 77 FR 70487 - Southern California Edison Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... COMMISSION Southern California Edison Company; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the Commission, see 37 FR 28,710 (Dec. 29, 1972), and the Commission's regulations, see 10 CFR... rule (10 CFR 2.302), which the NRC promulgated in August 2007 (72 FR 49,139). ] Issued at...

  12. 75 FR 81316 - Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... Edison Company (the licensee), for operation of Fermi 2, located in Monroe County, Michigan. Therefore... County due to a storm front moving through southeast Michigan. At 0238 hours, a tornado swept across the... Yale, of the Michigan Department of Natural Resources and Environment regarding the...

  13. 75 FR 76054 - Detroit Edison Company Fermi, Unit 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... described below and in the Environmental Assessment and Finding of No Significant Impact (75 FR 20867) that was published for the exemption which was granted in May 2010 for Enrico Fermi Atomic Power Plant Unit... significant effect on the quality of the human environment as documented in Federal Register (FR) notice...

  14. Educational Plant Survey--Edison Community College, December 7-10, 1992.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    Pursuant to Florida educational legislation, this report presents findings of the educational plant survey for Edison Community College (ECC) and includes recommendations for the 5-year period from December 7, 1992 through June 30, 1997. The 10 sections of the report present information on the following topics: (1) the educational plant survey…

  15. 78 FR 3470 - DTE Electric Company (Formerly the Detroit Edison Company), Notice of Availability of Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ... Environmental Impact Statement for a Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site... Combined License (COL) for Enrico Fermi Unit 3.'' The site is located in Monroe County, Michigan. The... conduct the scoping process was published in the Federal Register on December 10, 2008 (73 FR...

  16. Edison vs. Tesla

    ScienceCinema

    Hogan, Kathleen; Wallace, Hal; Ivestor, Rob

    2014-01-07

    As Edison vs. Tesla week heats up at the Energy Department, we are exploring the rivalry between Thomas Edison and Nikola Tesla and how their work is still impacting the way we use energy today. Whether you're on Team Tesla or Team Edison, both inventors were key players in creating things like batteries, power plants and wireless technologies -- all innovations we still use today. And as we move toward a clean energy future, energy efficient lighting, like LED bulbs, and more efficient electric motors not only help us save money on electricity costs but help combat climate change. For this, Tesla and Edison both deserve our recognition.

  17. Edison vs. Tesla

    SciTech Connect

    Hogan, Kathleen; Wallace, Hal; Ivestor, Rob

    2013-11-20

    As Edison vs. Tesla week heats up at the Energy Department, we are exploring the rivalry between Thomas Edison and Nikola Tesla and how their work is still impacting the way we use energy today. Whether you're on Team Tesla or Team Edison, both inventors were key players in creating things like batteries, power plants and wireless technologies -- all innovations we still use today. And as we move toward a clean energy future, energy efficient lighting, like LED bulbs, and more efficient electric motors not only help us save money on electricity costs but help combat climate change. For this, Tesla and Edison both deserve our recognition.

  18. Scrutinizing Edison.

    ERIC Educational Resources Information Center

    Saks, Judith Brody

    1995-01-01

    Describes the arrangements in Mount Clemens, Michigan, and Boston, Massachusetts, with the Edison Project. In this public-private partnership, Edison will be responsible for curriculum, facilities management, professional development, personnel, and food service. Cites other school districts considering having Edison schools. A sidebar summarizes…

  19. Outages of electric power supply resulting from cable failures Boston Edison Company system

    SciTech Connect

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  20. Illuminating Systems: Edison and Electrical Incandescence.

    ERIC Educational Resources Information Center

    Sanford, Greg

    1989-01-01

    Traces the life and inventions of Thomas A. Edison up to the invention of electrical incandescent lighting in 1881. Focuses on the process that Edison followed in developing incandescent lighting, including financial aspects, other competitors in the field, and the eventual establishment of the Edison Electric Light Companies. (RW)

  1. Edison's Opening Act.

    ERIC Educational Resources Information Center

    Garcia, Joseph

    1995-01-01

    A Texas elementary school is testing Edison's claim that a private company can manage a public school better and more profitably than a public school district working alone. Educators and parents already see improvements, but overenrollment has caused class size, scheduling, and computer shortage problems. Competition and payment problems could…

  2. 76 FR 66998 - Detroit Edison Company; Notice of Availability of Draft Environmental Impact Statement for a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... December 10, 2008 (73 FR 75142). Any interested party may submit comments on the draft EIS for... Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site Notice is hereby given that the...

  3. 76 FR 56820 - Detroit Edison Company, Fermi 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... safety of ERO personnel when responding to the site due to the increase in population and redistribution... the plant was first licensed. Additional delays may occur in the future based on continued population growth. Improvements have been made to equipment, procedures, and training since initial approval of...

  4. 75 FR 6736 - FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... FR 13967). There will be no change to radioactive effluents that affect radiation exposures to plant... [Part 73, Power Reactor Security Requirements, 74 FR 13926, 13967 (March 27, 2009)]. The licensee... Statement for BVPS-1, dated July 1973, and for BVPS-2, NUREG-1094, dated September 1985, as...

  5. Room used at one point by Charles Edison, the inventor's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Room used at one point by Charles Edison, the inventor's son, as his office while president of the Edison companies in the 1930s. The large metal tanks to the right are part of a modern halon gas fire suppression system for the building. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  6. Development of high temperature, corrosion resistant polymer concrete for use in the steam distribution system of the Consolidated Edison Company of New York. Final report

    SciTech Connect

    Webster, R.P.; Kukacka, L.E.; Reams, W.; Miller, C.A.

    1994-11-01

    The results of a research program conducted by Brookhaven National Laboratory (BNL) to evaluate and develop polymer concrete (PC) materials, which can be used as an alternative material of construction to conventional steel-reinforced portland cement concrete (PCC) within the steam distribution system of Consolidated Edison Company of New York (Con Ed), are presented. Three fiber-reinforced PC systems were identified and evaluated in a series of laboratory and in situ field tests. Based upon the results of these tests preliminary design studies were performed by BNL and the Con Ed Civil Design Division to determine the necessary floor slab, wall and roof thicknesses required to replace a typical steel reinforced PCC manhole with a fiber-reinforced PC manhole.

  7. Health Hazard Evaluation Report HETA 81-369-1591, HETA 81-466-1591, Electric Machinery - McGraw Edison Company, Minneapolis, Minnesota

    SciTech Connect

    Stephenson, R.L.; Murphy, D.C.; Habes, D.J.

    1985-04-01

    Environmental and breathing zone samples were analyzed for amines, aliphatic aldehydes, boron-trifluoride-monoethylamine, epichlorohydrin, total volatile fluorides, formaldehyde, lead, methyl- tetrahydrophthalic-anhydride, and n-butyl-glycidyl-ether at Electric Machinery/McGraw Edison Company, Minneapolis, Minnesota in December, 1981 and February, 1983. The surveys were requested by the union local because of irritative symptoms and respiratory problems reported by employees exposed to epoxy resin compounds and impregnated materials. The authors conclude that mucous membrane irritation and dermatitis are common among workers exposed to epoxy resins. A high prevalence of carpal tunnel syndrome was also found. Recommendations include reducing formaldehyde concentrations, using personal protective equipment and barrier creams, and maintaining proper work practices and good personal hygiene to minimize contact with epoxy resin materials.

  8. Lehigh Southwest Cement Company: Compressed Air System Improvement Saves Energy at a Lehigh Southwest Cement Plant

    SciTech Connect

    Not Available

    2003-10-01

    In 2001, Lehigh Southwest Cement Company improved the compressed air system at its cement plant in Tehachapi, California. Consequently, the system was able to operate more efficiently with less compressor capacity and at a lower system pressure. The project yielded total annual savings of 895,000 kWh and $199,000. The initial project cost was $417,000, but Southern California Edison provided a $90,000 incentive payment to reduce the cost to $327,000. Simple payback was about 20 months.

  9. Review of Boston Edison`s feedwater heater condition assessment program

    SciTech Connect

    Bell, B.J.; Palter, L.; Doody, S.

    1995-12-01

    Boston Edison Co. has proactively conducted numerous heat exchanger condition assessments at Mystic and New Boston Stations. This paper focuses upon low and high pressure feedwater heater assessments, performed in accordance with EPRI GS-6724, Condition Assessment Guidelines for Fossil Fuel Power Plants. The elements of this EPRI guideline are reviewed. Thereafter, Boston Edison`s condition assessment approach, techniques employed, typical findings obtained and benefits derived are described on a multiple case history basis.

  10. Detroit Edison conquers zebra mussels

    SciTech Connect

    Harwood, D.B.; Buda, D.J. )

    1993-11-01

    A potentially troublesome zebra mussel infestation at Detroit Edison's Harbor Beach Power Plant was nipped in time. Reducing the oxygen content of water inside the plant's water systems and using steam to thermally treat a colony of mussels that was established in the plant's screenhouse prevented the problem. So successful was the temperature treatment that it will be used regularly as part of the plant's annual mussel removal program.

  11. 76 FR 77855 - Detroit Edison Company; Notice of Availability of Errata Sheet for the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ..., 2011 (76 FR 66998). The U.S. Environmental Protection Agency's NOA was also published on October 28, 2011 (76 FR 66925). The purpose of this notice is to inform the public of the contents of the errata... Statement for a Combined License for Unit 3 at the Enrico Fermi Atomic Power Plant Site Notice is...

  12. Review of consolidated Edison`s integrated resource bidding program

    SciTech Connect

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Baldick, R.; Milne, A.

    1993-07-01

    Competitive bidding has emerged as the dominant method for procuring new resources by US utilities. In New York, the Public Service Commission (NYPSC) ordered the state`s seven investor-owned utilities to develop bidding programs to acquire supply and DSM resource options. Utilities were allowed significant discretion in program design in order to encourage experimentation. Competitive bidding programs pose formidable policy, design, and management challenges for utilities and their regulators. Yet, there have been few detailed case studies of bidding programs, particularly of those utilities that take on the additional challenge of having supply and DSM resources compete head-to-head for a designated block of capacity. To address that need, the New York State Energy Research and Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy`s Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the bidding programs of two utilities that tested the integrated ``all-sources`` approach. This study focuses primarily on Consolidated Edison Company of New York`s (Con Edison) bidding program; an earlier report discusses our review of Niagara Mohawk`s program (Goldman et al 1992). We reviewed relevant Commission decisions, utility filings and signed contracts, interviewed utility and regulatory staff, surveyed DSM bidders and a selected sample of DSM non-bidders, and analyzed the bid evaluation system used in ranking bids based on detailed scoring information on individual bids provided by Con Edison.

  13. Health hazard evaluation report No. HHE-80-233-793, Davis Bessie Nuclear Power Station, Toledo Edison Company, United Engineers and Contractors Company (UE and C), Oak Harbor, Ohio

    SciTech Connect

    Cone, J.; Hartle, R.

    1981-01-01

    Personal air samples were analyzed and employees were given medical evaluations at Davis Bessie Nuclear Power Station (SIC-4911) in Oak Harbor, Ohio. Requests for evaluation were made by a union representative of the United Engineers and Contractors and a union representative of employees of Toledo Edison Company, working on site at the power station, to evaluate employee skin and scalp problems due to exposure to ceramic wood fibers. Preliminary surveys were conducted on September 24 and 25, 1980 and a follow-up survey was performed on October 16, 1980. Environmental evaluation consisted of gravimetric analyses of personal air samples for airborne ceramic wool fibers. A total of 400 production and maintenance workers and varying numbers of construction workers were exposed to the fibers during installation of insulation which was completed at the time of the survey. The three personal air samples showed no accumulation of particulates and fibers detected were nonrespirable. Medical evaluations were conducted in 52 workers and scalp scrapings were obtained from 43 workers. Thirty seven workers had histories suggestive of irritant dermatitis of the scalp; 24 workers had physical findings consistent with the diagnosis. Of the 43 scalp samples, 18 were contaminated with organisms of the gut, perineum, skin or respiratory tract. Dermatitis was directly related to the history of dust exposure. The authors conclude that a potential health hazard exists for employees from exposure to ceramic wool fiber. Recommendations include provision of handwashing facilities and protective clothing for employees, and installation of an impermeable covering for the ceramic wool fiber.

  14. Bringing Edison to Light.

    ERIC Educational Resources Information Center

    Barbato, Joseph

    1979-01-01

    The papers of Thomas A. Edison will be compiled and published in a 20-year project under the sponsorship of the National Park Service, the New Jersey Historical Commission, the Smithsonian Institution, and Rutgers University. This effort, the Thomas A. Edison Papers Project, and its background are described. (JMD)

  15. Practicing like Thomas Edison.

    PubMed

    Baum, Neil; Ornstein, Hal

    2013-01-01

    For many centuries, medicine has practiced in a vacuum, and the healthcare profession has been isolated from other scientific disciplines. Beginning in the 20th century, doctors and scientists have looked to others for ideas, suggestions, innovations, and new technologies. Probably no one in the past hundred years has done so much to change the world than Thomas Edison. This article will discuss eight principles of Edison and how they may apply to our profession and our practices. PMID:23866659

  16. 1. NORTH IDAHO PHOSPHATE COMPANY PLANTS. VIEW IS TO THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. NORTH IDAHO PHOSPHATE COMPANY PLANTS. VIEW IS TO THE NORTHEAST, WITH THE SHIPPING AND STORAGE WAREHOUSE, AMMONIUM PHOSPHATE FERTILIZER PLANT, AND PHOSPHORIC ACID PLANT APPEARING IN SUCCESSION DOWN GOVERNMENT GULCH. - North Idaho Phosphate Company, Silver King Community, Kellogg, Shoshone County, ID

  17. 72. SOUTH PLANT SHELL OIL COMPANY COMPLEX, FROM CHEMICAL STORAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. SOUTH PLANT SHELL OIL COMPANY COMPLEX, FROM CHEMICAL STORAGE TANK. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  18. 8. SOUTH PLANT SHELL OIL COMPANY FACILITIES, WITH PIPELINE PEDESTALS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. SOUTH PLANT SHELL OIL COMPANY FACILITIES, WITH PIPELINE PEDESTALS IN FOREGROUND. VIEW TO SOUTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  19. 51. SOUTH PLANT PROCESS PIPING, WITH SHELL OIL COMPANY BUILDINGS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. SOUTH PLANT PROCESS PIPING, WITH SHELL OIL COMPANY BUILDINGS IN BACKGROUND. VIEW TO NORTH. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  20. Inspiration, Perspiration, and Time: Operations and Achievement in Edison Schools

    ERIC Educational Resources Information Center

    Gill, Brian P.; Hamilton, Laura S.; Lockwood, J. R.; Marsh, Julie A.; Zimmer, Ron W.; Hill, Deanna; Pribesh, Shana

    2005-01-01

    New forms of governing and managing public schools have proliferated in recent years, spawning the establishment and growth of companies that operate public schools under contract. Among these education management organizations, or EMOs, the largest and most visible is Edison Schools, Inc., with a nationwide network in 2004-2005 of 103 managed…

  1. Lessons Learned: The Edison Project Founder's Musings on American Schooling.

    ERIC Educational Resources Information Center

    Whittle, Christopher

    1997-01-01

    The entrepreneur behind the Edison Project and Channel One shares his observations about the unfairness of public school critics, the "tyranny" of operational demands, and the promise of national school companies for underemployed teachers and research and development ventures. Praising public schools for being receptive to new concepts, the…

  2. OUT Success Stories: Solar Trough Power Plants

    DOE R&D Accomplishments Database

    Jones, J.

    2000-08-01

    The Solar Electric Generating System (SEGS) plants use parabolic-trough solar collectors to capture the sun's energy and convert it to heat. The SEGS plants range in capacity from 13.8 to 80 MW, and they were constructed to meet Southern California Edison Company's periods of peak power demand.

  3. 126. JOB NO. X98396, PLANT LAYOUT, FORD MOTOR COMPANY LONG ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    126. JOB NO. X9-8396, PLANT LAYOUT, FORD MOTOR COMPANY LONG BEACH ASSEMBLY PLANT, MARCH 1940. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  4. 12. SOUTH PLANT FROM SHELL OIL COMPANY CHEMICAL STORAGE TANK, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. SOUTH PLANT FROM SHELL OIL COMPANY CHEMICAL STORAGE TANK, SHOWING FACILITIES MAINTENANCE BUILDING (543) AT LEFT AND WHITE PHOSPHOROUS FILLING BUILDING (541) AND WAREHOUSE (542) AT CENTER. VIEW TO SOUTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  5. 73. DETAIL OF SOUTH PLANT SHELL OIL COMPANY COMPLEX FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    73. DETAIL OF SOUTH PLANT SHELL OIL COMPANY COMPLEX FROM CHEMICAL STORAGE TANK. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  6. Commonwealth Edison Company pressure locking test report

    SciTech Connect

    Bunte, B.D.; Kelly, J.F.

    1996-12-01

    Pressure Locking is a phenomena which can cause the unseating thrust for a gate valve to increase dramatically from its typical static unseating thrust. This can result in the valve actuator having insufficient capability to open the valve. In addition, this can result in valve damage in cases where the actuator capability exceeds the valve structural limits. For these reasons, a proper understanding of the conditions which may cause pressure locking and thermal binding, as well as a methodology for predicting the unseating thrust for a pressure locked or thermally bound valve, are necessary. This report discusses the primary mechanisms which cause pressure locking. These include sudden depressurization of piping adjacent to the valve and pressurization of fluid trapped in the valve bonnet due to heat transfer. This report provides a methodology for calculating the unseating thrust for a valve which is pressure locked. This report provides test data which demonstrates the accuracy of the calculation methodology.

  7. Energy Star program benefits Con Edison

    SciTech Connect

    1995-05-01

    Impressed with savings in energy costs achieved after upgrading the lighting and air conditioning systems at its Manhattan headquarters, Home Box Office (HBO) wanted to do more, James Flock, vice president for computer and office systems, contacted Con Edison Co. of New York in March 1991 to determine what the company could do to save money by reducing energy consumed by personal computers. Arthur Kressner, Con Edison Research and Development manager contacted industry organizations and manufacturers for advice, but was told only to shut off computers at night and on weekends. Kressner arranged a series of meetings with IBM and the Electric Power Research Institute (EPRI) to discuss the issue, then approached the U.S. Environmental Protection Agency (EPA), which was designing a program to promote the introduction and use of energy-efficient office equipment. In 1992, the EPA announced the Energy Star program for PCs, enabling manufacturers to display the Energy Star logo on machines meeting program criteria, including the ability to enter a sleep mode in which neither the computer nor monitor consume more than 30 W or electricity. Industry experts estimate national energy consumption by office equipment could double by the year 2000, but Energy Star equipment is expected to improve efficiency and help maintain electric loads.

  8. Evaluation and implementation of VANTAGE 5 fuel-Commonwealth Edison's perspective

    SciTech Connect

    Chin, R.J. )

    1993-01-01

    The Commonwealth Edison nuclear system comprises six General Electric boiling water reactors and six Westinghouse pressurized water reactors (PWRs). Since 1982, Commonwealth Edison has performed its own fuel management, neutronic licensing, and operations support analyses using the Westinghouse codes and methodology and will shortly take over the thermal-hydraulic and balance-of-plant transient analyses from Westinghouse. This paper takes a retrospective look at Commonwealth Edison's experience with those VANTAGE 5 features implemented in these reactors, especially their impact on the analytical design capability, reload design margins and constraints, and fuel performance.

  9. Edison Demonstration of Smallsat Networks

    NASA Technical Reports Server (NTRS)

    Westley, Deborah; Martinez, Andres; Petro, Andrew

    2015-01-01

    The goal of NASA's Edison Demonstration of Smallsat Networks (EDSN) mission is to demonstrate interactive satellite swarms capable of collecting, exchanging and transmitting multi-point scientific measurements. Satellite swarms enable a wide array of scientific, commercial and academic research not achievable with a single satellite. The EDSN satellites are scheduled to be launched into space as secondary payloads on the first flight of the Super Strypi launch vehicle no earlier than Oct. 29, 2015.

  10. 18 CFR 367.4117 - Account 411.7, Losses from disposition of service company plant.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 411.7, Losses from disposition of service company plant. 367.4117 Section 367.4117 Conservation of Power and Water... § 367.4117 Account 411.7, Losses from disposition of service company plant. (a) The service company...

  11. 18 CFR 367.4116 - Account 411.6, Gains from disposition of service company plant.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 411.6, Gains from disposition of service company plant. 367.4116 Section 367.4116 Conservation of Power and Water... § 367.4116 Account 411.6, Gains from disposition of service company plant. (a) The service company...

  12. 76 FR 41530 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... COMMISSION Connecticut Yankee Atomic Power Company, Haddam Neck Plant; Notice of Consideration of Approval of... Atomic Power Company (CYAPCO), as owner and licensed operator of the Haddam Neck Plant. According to...

  13. 76 FR 52356 - Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 1; Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... COMMISSION Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 1; Environmental Assessment and... to Indiana Michigan Power Company (the licensee), for operation of Donald C. Cook Nuclear Plant, Unit 1 (DCCNP-1), located in Berrien County, Michigan, in accordance with Title 10 of the Code of...

  14. Permeable Pavement Research - Edison, New Jersey

    EPA Science Inventory

    This presentation provides the background and summary of results collected at the permeable pavement parking lot monitored at the EPA facility in Edison, NJ. This parking lot is surfaced with permeable interlocking concrete pavers (PICP), pervious concrete, and porous asphalt. ...

  15. Rival Centennial Casts New Light on Edison.

    ERIC Educational Resources Information Center

    Broad, William J.

    1979-01-01

    Discusses how the celebration of the centennial of the electric lamp raises the claim of the supporters of Sir Joseph Swan in England that Swan not Edison was the first inventor of the light bulb. (HM)

  16. Technical evaluation of the susceptibility of safety-related systems to flooding caused by the failure of non-category 1 systems for the San Onofre Nuclear Power Plant, Unit 1

    SciTech Connect

    Latorre, V.R.; Victor, R.A.

    1980-11-01

    This report documents the technical evaluation of Southern California Edison Company's San Onofre Nuclear Power Plant, Unit 1, to determine whether the failure of any non-Category 1 (seismic) equipment could result in a condition, such as flooding, that might potentially adversely affect the performance of safety-related equipment required for the safe shutdown of the facility or to mitigate the consequences of an accident. Criteria developed by the US Nuclear Regulatory Commission were used to evaluate the acceptability of the existing protection as well as measures taken by Southern California Edison Company to minimize the danger of flooding and to protect safety-related equipment.

  17. 75 FR 54618 - CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... Energy Regulatory Commission CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities... for Renewable Energy, Inc. (Complainant) filed a complaint against Pacific Gas and Electric...

  18. Fantasy Seed Company: A Role Playing Game for Plant Breeding Courses

    ERIC Educational Resources Information Center

    Hague, Steve S.

    2011-01-01

    Understanding plant breeding as well as procedures and issues of seed companies are skills students studying agronomy need to acquire. Simulation games can be effective teaching tools in developing higher-order thinking skills of students. The "Fantasy Seed Company" game was developed to create motivated learners by allowing students to run a mock…

  19. 77 FR 11171 - License Renewal Application for Callaway Plant, Unit 1, Union Electric Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... COMMISSION License Renewal Application for Callaway Plant, Unit 1, Union Electric Company AGENCY: Nuclear.... SUMMARY: Union Electric Company, a subsidiary of Ameren Corporation and doing business as Ameren Missouri... (Callaway). Callaway is located in Callaway County, MO. The current operating license for Callaway...

  20. 75 FR 34776 - Florida Power & Light Company; Turkey Point Nuclear Generating Plant, Units 3 and 4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... COMMISSION Florida Power & Light Company; Turkey Point Nuclear Generating Plant, Units 3 and 4; Environmental..., for Facility Operating License Nos. DPR-31 and DPR-41, issued to Florida Power & Light Company (the... quantity of non- radiological effluents. No changes to the National Pollution Discharge Elimination...

  1. 76 FR 68512 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... environment (October 26, 2011; 76 FR 6633). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Renewed Facility Operating...

  2. 77 FR 26793 - Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... significant effect on the quality of the human environment (76 FR 53497; August 26, 2011). This exemption is... COMMISSION Florida Power and Light Company, St. Lucie Plant, Unit No. 2, Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  3. 77 FR 13156 - Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... environment (February 15, 2012; 77 FR 8903). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company, the licensee, doing business as Progress Energy Carolinas Inc.,...

  4. 75 FR 9958 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... significant effect on the quality of the human environment (75 FR 3942, dated January 25, 2010). This... COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company (the licensee), now doing business as Progress Energy...

  5. 76 FR 77563 - Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... exemption will not have a significant effect on the quality of the human environment (76 FR 53497; dated... COMMISSION Florida Power & Light Company; St. Lucie Plant, Unit No. 1; Exemption 1.0 Background The Florida Power & Light Company (FPL, the licensee) is the holder of Renewed Facility Operating License No....

  6. 75 FR 16871 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... significant effect on the quality of the human environment (75 FR 8753, February 25, 2010). This exemption is... COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company (CP&L, the licensee) is the holder of Facility Operating...

  7. 18 CFR 367.4117 - Account 411.7, Losses from disposition of service company plant.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Account 411.7, Losses from disposition of service company plant. 367.4117 Section 367.4117 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL...

  8. 18 CFR 367.4116 - Account 411.6, Gains from disposition of service company plant.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Account 411.6, Gains from disposition of service company plant. 367.4116 Section 367.4116 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL...

  9. DEMONSTRATION OF NATURAL GAS REBURN FOR NOX EMISSIONS REDUCTION AT OHIO EDISON COMPANY'S CYCLONE-FIRED NILES PLANT UNIT NO. 1

    EPA Science Inventory

    The report describes a demonstration of reburning on a cyclone-fired boiler. The project included a review of reburn technology, aerodynamic flow model testing, long-term load dispatch testing, and boiler tube wall thickness monitoring. The report also contains a description of O...

  10. Human-factors control-room-design review draft audit report: Detroit Edison Company, Enrico Fermi Atomic Power Plant--Unit 2

    SciTech Connect

    Savage, J.W.

    1981-08-12

    A human factors audit of the Fermi-2 control room was conducted April 27 through May 1, 1981. This report contains the audit team findings, organized according to the draft NUREG-0700 guidelines sections. The discrepancies identified during the audit are categorized according to their severity and the required schedule for their resolution.

  11. Boards at background, left are displays of parts for Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Boards at background, left are displays of parts for Edison phonographs which were used in management of production and sales promotions. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  12. Large loudspeaker horns and crated Edison radios from 1929 are ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Large loudspeaker horns and crated Edison radios from 1929 are stored in a side room on the third floor. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  13. Biofouling monitoring and control program at the Boston Edison Pilgrim Nuclear Station: A twelve year history

    SciTech Connect

    McDonald, D.J.; Armstrong, W.J.; Carucci, C.A.

    1996-08-01

    This paper reviews the history of the Biofouling Monitoring and Control Program at the Boston Edison Company Pilgrim Nuclear Power Station. The program was initially developed in 1982 in response to serious operations, maintenance and performance related problems due to biofouling in both the circulating and service water systems. Although implemented seven years prior to federal mandates under GL 89-13, this program also satisfies regulatory criteria for biofouling monitoring and control of nuclear service water systems. Since its inception, the impact of macrofouling on plant operation and availability has been significantly reduced. Stringent monitoring for blue mussels, installation of mechanical barriers to horseshoe crabs, improvements in screens, screenwash and debris removal systems, and an on-going commitment to biofouling control have reduced the number of condenser backwashes per year from > 40 (1989) to < 10. Depending on conditions and timing of a backwash, the resulting economic gain from this improvement alone can be 1.5 to more than 4 million dollars a year. Other improvements in related components and the service water system have also resulted in reduced maintenance related problems and an additional cost benefit to the plant. 13 refs., 6 figs., 1 tab.

  14. 'Music Room,' third floor, is used for storage of Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    'Music Room,' third floor, is used for storage of Edison phonographs; this room was used during the 1920s to audition recording artists and to listen to prospective pieces of music for release on Edison records. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  15. 75 FR 3943 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... FR 13967). There will be no change to radioactive effluents that affect radiation exposures to plant... [Part 73, Power Reactor Security Requirements, 74 FR 13926, 13967 (March 27, 2009)]. The licensee... COMMISSION Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and...

  16. Permeable pavement research – Edison, New Jersey

    EPA Science Inventory

    These are the slides for the New York City Concrete Promotional Council Pervious Concrete Seminar presentation. The basis for the project, the monitoring design and some preliminary monitoring data from the permeable pavement parking lot at the Edison Environmental Center are pre...

  17. Lehigh Southwest Cement Company: Compressed Air System Improvement Saves Energy

    SciTech Connect

    2003-10-01

    In 2001, Lehigh Southwest Cement Company improved the compressed air system at its cement plant in Tehachapi, California. Consequently, the system was able to operate more efficiently with less compressor capacity and at a lower system pressure. The project yielded total annual savings of 895,000 kWh and $199,000. The initial project cost was $417,000, but Southern California Edison provided a $90,000 incentive payment to reduce the cost to $327,000. Simple payback was about 20 months.

  18. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... have a significant effect on the quality of the human environment (75 FR 14638). This exemption is... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption 1.0 Background...

  19. 76 FR 28481 - Carolina Power & Light Company; Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company; Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption, pursuant to Title...

  20. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... part 73 as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13967). There will be no... Requirements, 74 FR 13926, 13967 (March 27, 2009)). The licensee currently maintains a security system... COMMISSION Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2;...

  1. 75 FR 77919 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering issuance of an exemption,...

  2. 75 FR 80547 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... FR 13926), establish and update generically applicable security requirements similar to those... FR 77919 dated December 14, 2010). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption...

  3. 77 FR 51071 - Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 2, Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Indiana Michigan Power Company, Donald C. Cook Nuclear Plant, Unit 2, Environmental Assessment and Finding of No Significant Impact The Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an exemption and an...

  4. 75 FR 8152 - Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Part 73 as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13926). There will be no... FR 13926 (March 27, 2009)]. With its request to extend the implementation deadline, the licensee... COMMISSION Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and...

  5. 75 FR 10838 - Pacific Gas and Electric Company; Diablo Canyon Power Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... environment (75 FR 8152; dated February 23, 2010). This exemption is effective upon issuance. Dated at... COMMISSION Pacific Gas and Electric Company; Diablo Canyon Power Plant; Exemption 1.0 Background Pacific Gas... law, and will not endanger life or property or the common defense and security, and are otherwise...

  6. A robotics initiative at Commonwealth Edison

    SciTech Connect

    Hamby, P.; Munson, R.

    1995-10-01

    Current and planned uses of robotic equipment at Commonwealth Edison (ComEd) nuclear reactors are described. The equipment is used primarily for maintenance activities. Robotics, video, and other forms of remote technology helps ComEd to be cost competitive and lower radiation exposures. A ComEd robotics initiative to further promote robotics is highlighted. ComEd has 12 nuclear reactors at six sites. Three sites operate General Electric boiling water reactors and three sites operate Westinghouse pressurized water reactors.

  7. The impact of electric vehicles on the Southern California Edison System

    SciTech Connect

    Ford, A.

    1992-07-01

    This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the Air Quality Impacts of Energy Efficiency'' Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers' view has been studied with special emphasis on the role of marketable permit systems. The utilities' view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility's average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

  8. The impact of electric vehicles on the Southern California Edison System. Final report

    SciTech Connect

    Ford, A.

    1992-07-01

    This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the ``Air Quality Impacts of Energy Efficiency`` Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers` view has been studied with special emphasis on the role of marketable permit systems. The utilities` view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility`s average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

  9. 77 FR 11173 - Renewal of Facility Operating License No. NPF-30, Union Electric Company, Callaway Plant, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28... COMMISSION Renewal of Facility Operating License No. NPF-30, Union Electric Company, Callaway Plant, Unit 1... Electric Company to operate the Callaway Plant, Unit 1 (Callaway), at 3565 megawatts thermal. The...

  10. 76 FR 39445 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... issuance of the renewed licenses was published in the Federal Register on June 17, 2008 (73 FR 34335). For... COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2... Company--Minnesota (licensee), the ] operator of Prairie Island Nuclear Generating Plant, Units 1 and...

  11. 76 FR 1197 - Detroit Edison Company, FERMI 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... exemptions are authorized by law, will not present an undue risk to public health or safety, and are.... Therefore, the exemption is authorized by law. No Undue Risk to Public Health and Safety The underlying... no undue risk to public health and safety. Consistent With Common Defense and Security The...

  12. 75 FR 15748 - Detroit Edison Company; Fermi 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... Plan, Safeguards Contingency Plan, and Cyber Security Plan referred to collectively hereafter as... sabotage by designing and implementing comprehensive site security programs. The amendments to 10 CFR 73.55 published on March 27, 2009, establish and update generically applicable security requirements similar...

  13. 76 FR 32238 - Detroit Edison Company, Fermi 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-03

    ... published on March 27, 2009 (74 FR 13926), establish and update generically applicable security requirements... of 10 CFR 73.55, as published on March 27, 2009 (76 FR 13926). 4.0 Environmental Consideration This... Significant Impact (76 FR 187) for the treatment of licensee exemption requests from the implementation...

  14. 78 FR 69661 - Michael Canales v. Edison International, EIX, Southern California Edison; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... shareholders and energy market manipulation by not adhering to the standards of the Uniform System of Accounts... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Michael Canales v. Edison International, EIX, Southern California...

  15. Edison Is the Symptom, NCLB Is the Disease

    ERIC Educational Resources Information Center

    Campbell, Peter

    2007-01-01

    Engaging students requires giving them a say in what they learn and how they will learn it. However, in strictly disciplined, rule-bound schools with test-driven curricula, this cannot happen. Edison Schools, Inc., a for-profit Education Management Organization (EMO), and Confluence Academy, an Edison-run school located in one of the most…

  16. One corner of the third floor has examples of Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    One corner of the third floor has examples of Edison motion picture projectors in rather poor condition. Better preserved examples are in storage in Vault #12. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  17. Analysis of a homemade Edison tinfoil phonograph.

    PubMed

    Sagers, Jason D; McNeese, Andrew R; Lenhart, Richard D; Wilson, Preston S

    2012-10-01

    Thomas Edison's phonograph was a landmark acoustic invention. In this paper, the phonograph is presented as a tool for education in acoustics. A brief history of the phonograph is outlined and an analogous circuit model that describes its dynamic response is discussed. Microphone and scanning laser Doppler vibrometer (SLDV) measurements were made on a homemade phonograph for model validation and inversion for unknown model parameters. SLDV measurements also conclusively illustrate where model assumptions are violated. The model elements which dominate the dynamic response are discussed. PMID:23039413

  18. Boston Edison and LG&E win 7th annual substation design contest

    SciTech Connect

    Beaty, W.

    1996-07-01

    Boston`s Edison`s Network Station 53 won First Place in the engineering/operations category of Electric Light & Power`s 7th annual substation design contest. Station 53 also took Second Place in the aesthetic design category. Boston Edison is no stranger to the contest, having won top honors in the aesthetic category in the very first contest in 1990. That same year, Boston took Second Place in engineering/operations design and Third Place in aesthetic design. Station 53 occupies a 12,074-square-foot site in the heart of the Boston financial district. It replaces an existing station where the land was required for Boston`s Central Artery project. Great care was taken to ensure that Station 53 would blend into the cityscape and be pleasing to the eye. The architectural treatment was designed by the Boston Anderson-Nichols & Company Inc., in cooperation with the Boston Redevelopment Authority. The latest in engineering technology was utilized to guarantee reliability, maintain the highest service quality and provide capacity for future load growth in the downtown area. Station 53 is supplied by two underground 115-kV pipe-type transmission cables. Unattended and remotely operated, Station 53 has the capability of sectionalizing the 115-kV power supply by remote control to isolate the faulted sections.

  19. Detroit Edison's Fermi 1 - Preparation for Reactor Removal

    SciTech Connect

    Swindle, Danny

    2008-01-15

    This paper is intended to provide information about the ongoing decommissioning tasks at Detroit Edison's Fermi 1 plant, and in particular, the work being performed to prepare the reactor for removal and disposal. In 1972 Fermi 1 was shutdown and the fuel returned to the Atomic Energy Commission. By the end of 1975, a retirement plan was prepared, the bulk sodium removed, and the plant placed in a safe store condition. The plant systems were left isolated with the sodium containing systems inert with carbon dioxide in an attempt to form a carbonate layer, thus passivating the underlying reactive sodium. In 1996, Detroit Edison determined to evaluate the condition of the plant and to make recommendations in relation to the Fermi 1 future plans. At the end of 1997 approval was obtained to remove the bulk asbestos and residual alkali-metals (i.e., sodium and sodium potassium (NaK)). In 2000, full nuclear decommissioning of the plant was approved. To date, the bulk asbestos insulation has been removed, and the only NaK remaining is located in six capillary instrument tubes. The remaining sodium is contained within the reactor, two of the three primary loops, and miscellaneous removed pipes and equipment to be processed. The preferred method for removing or reacting sodium at Fermi 1 is by injecting superheated steam into a heated, nitrogen inert system. The byproducts of this reaction are caustic sodium hydroxide, hydrogen gas, and heat. The decision was made to separate the three primary loops from the reactor for better control prior to processing each loop and the reactor separately. The first loop has already been processed. The main focus is now to process the reactor to allow removal and disposal of the Class C waste prior to the anticipated June 2008 closure of the Barnwell radioactive waste disposal facility located in South Carolina. Lessons learnt are summarized and concern: the realistic schedule and adherence to the schedule, time estimates, personnel

  20. Advanced Communication and Control of Distributed Energy Resources at Detroit Edison

    SciTech Connect

    Haukur Asgeirsson; Richard Seguin

    2004-01-31

    The project objective was to create the communication and control system, the process and the economic procedures that will allow owners (e.g., residential, commercial, industrial, manufacturing, etc.) of Distributed Energy Resources (DER) connected in parallel to the electric distribution to have their resources operated in a manner that protects the electric utility distribution network and personnel that may be working on the network. The Distribution Engineering Workstation (DEW) (a power flow and short circuit modeling tool) was modified to calculate the real-time characteristics of the distribution network based on the real-time electric distribution network information and provide DER operating suggestions to the Detroit Edison system operators so that regional electric stability is maintained. Part of the suggestion algorithm takes into account the operational availability of DER’s, which is known by the Energy Aggregator, DTE Energy Technologies. The availability information will be exchanged from DTE Energy Technologies to Detroit Edison. For the calculated suggestions to be used by the Detroit Edison operators, procedures were developed to allow an operator to operate a DER by requesting operation of the DER through DTE Energy Technologies. Prior to issuing control of a DER, the safety of the distribution network and personnel needs to be taken into account. This information will be exchanged from Detroit Edison to DTE Energy Technologies. Once it is safe to control the DER, DTE Energy Technologies will issue the control signal. The real-time monitoring of the DECo system will reflect the DER control. Multi-vendor DER technologies’ representing approximately 4 MW of capacity was monitored and controlled using a web-based communication path. The DER technologies included are a photovoltaic system, energy storage, fuel cells and natural gas/diesel internal combustion engine generators. This report documents Phase I result for the Detroit Edison

  1. Dynamic performance of fossil-fueled power plants

    SciTech Connect

    Armor, A.F.; Bennett, W.E.; Di Domenico, P.N.; Shor, S.W.W.; Smith, L.P.

    1982-10-01

    Dynamic simulation is a valuable tool for optimizing the design and operation of steam electric power plants, especially those that change load or shut down frequently. However, its use has been limited because it has required experienced modeling specialists. An easy-to-use modeling system has therefore been developed under Electric Power Research Institute sponsorship. It has been tested by simulating transients performed on Boston Edison Company's Mystic Unit 7, a 550-MW oil-fired plant, with good agreement between the simulations and the recorded plant transients.

  2. 78 FR 28245 - In the Matter of Southern Nuclear Operating Company, Farley Nuclear Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION [NRC-2013-0093; Docket No.: 50-348, 50-364; License No.: NPF-2, NPF-8; EA-12-145] In the Matter of Southern Nuclear Operating Company, Farley Nuclear Plant, Units 1 and 2; Confirmatory Order I Southern Nuclear Operating Company (SNC or Licensee)...

  3. 77 FR 40914 - In the Matter of Indiana Michigan Power Company, D. C. Cook Nuclear Power Plant; Confirmatory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR... of Indiana Michigan Power Company, D. C. Cook Nuclear Power Plant; Confirmatory Order Modifying License (Effective Immediately) I Indiana Michigan Power Company (Licensee) is the holder of...

  4. 75 FR 80545 - Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... Register notice dated March 27, 2009 (74 FR 13967). There will be no change to radioactive effluents that... COMMISSION Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental... Carolina Power & Light Company (the licensee), for operation of the H. B. Robinson Steam Electric...

  5. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... COMMISSION Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental..., ``Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,'' and 10 CFR... Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee),...

  6. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... environment 75 FR 8410, February 24, 2010. This exemption is effective upon issuance. Dated at Rockville... COMMISSION Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light Company (the licensee) is the holder of Facility Operating License No....

  7. Green Infrastructure Research and Demonstration at the Edison Environmental Center

    EPA Science Inventory

    This presentation will review the need for storm water control practices and will present a portion of the green infrastructure research and demonstration being performed at the Edison Environmental Center.

  8. 78 FR 49305 - Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-13

    ... COMMISSION Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2; Application... Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission... Nuclear Power Plant, Unit Nos. 1 and 2, respectively, located in Somervell County, Texas. The...

  9. 75 FR 9622 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... exemption will not have a significant effect on the quality of the human environment 75 FR 3943; dated... COMMISSION Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2... Electric Generating Plant, Units 1 and 2 (VEGP). The licenses provide, among other things, that...

  10. Electric Avenue. A Utility Company's Work Experience Program Broadens Opportunities for Students.

    ERIC Educational Resources Information Center

    Ingles, Pat

    1994-01-01

    A job skills partnership between Southern California Edison Company and local high schools pairs juniors and seniors with journeyworker mentors for a year, experiencing six-week rotations in maintenance, operations, administration, warehouse, and technical occupations. (JOW)

  11. 75 FR 66744 - Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... Energy Regulatory Commission Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities... amendment to its September 1, 2010 filed complaint against Pacific Gas and Electric Company,...

  12. Failure analysis report: Heat exchanger tubes geothermal binary power plant, Magma Electric Company, East Mesa, California

    SciTech Connect

    Anliker, Dennis M.; Ellis, Peter F. II

    1982-05-01

    Radian received twelve sections of heat exchanger tubing from the Magma Electric Company's 10MW(e) East Mesa binary geothermal power plant. Three tube sections were received from each of four shell and tube heat exchangers (HX1, Hx6, HX8, and Hx10) of the isobutane vaporizer train. All samples were taken from the upper few rows of tubes. Two months later, four more tube sections were received. These four sections were taken from the lower rows of heat exchangers 1, 6 (two sections), and 10. Radian was requested to investigate the cause of severe pitting failure of these heat exchanger tubes. This report is part of a continuing DOE effort to gain insight into the service life of component materials employed in geothermal energy utilization.

  13. Disposal of United Nuclear Company materials at the Y-12 Plant

    SciTech Connect

    Butz, T.R.; Stoner, H.H.

    1983-12-19

    The UNC Recovery Systems Company, located at Wood River Junction, Rhode Island, was involved in the recovery of enriched uranium from scrap materials generated primarily in defense program activities of the DOE and its predecessor agencies. Following shutdown of the recovery operations in August 1980, UNC was required to decontaminate facilities and the associated waste lagoon systems and to remove the resultant low-level radioactive waste out of the state of Rhode Island. In view that the waste resulted from the processing of scrap materials generated in DOE Defense Programs activities and due to the lack of adequate capacity at commercial waste disposal facilities, DOE agreed to accept the waste for burial at the Y-12 Plant. Site characterization and well monitoring results are presented of the disposal site.

  14. The Fight To Save the Edison Charter in San Francisco. Briefing.

    ERIC Educational Resources Information Center

    Dphrepaulezz, Diallo

    In 1998, the San Francisco Board of Education granted a charter to Edison Schools, Inc., to manage the Edison Charter Academy. In 2001, it commenced a formal investigation of complaints that Edison had materially violated its charter and notified the school of its intent to revoke the charter. This briefing traces the events from the commencement…

  15. Thomas Edison's Inventions in the 1900s and Today: From "New" to You! [Lesson Plan].

    ERIC Educational Resources Information Center

    2002

    The purpose of this lesson is to familiarize students with life and technology around 1900 so that they can better understand how Thomas Edison and his many inventions influenced both. Without some understanding of Edison's time, it is unclear just how significant an impact Edison had on the world, both then and now. While the incandescent light…

  16. 75 FR 24998 - In the Matter of Florida Power and Light Company: Turkey Point Nuclear Plant; Independent Spent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... to prohibit unauthorized access to sensitive information and to prohibit modification of the... COMMISSION In the Matter of Florida Power and Light Company: Turkey Point Nuclear Plant; Independent...

  17. 75 FR 9620 - Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... have a significant effect on the quality of the human environment (75 FR 3761; dated January 22, 2010... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Exemption...

  18. 75 FR 76052 - Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... environment (75 FR 73135, dated November 29, 2010). This exemption is effective upon issuance. Dated at... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant, Units 1 and 2;...

  19. 75 FR 57535 - Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... Federal Register on June 14, 2010 (75 FR 33653). On September 10, 2010, the NRC approved and issued... COMMISSION Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Notice of Issuance of Amendment To... application dated April 2, 2009, as supplemented March 30, 2010, Connecticut Yankee Atomic Power...

  20. 77 FR 36300 - In the Matter of Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Confirmatory Order...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires... COMMISSION In the Matter of Connecticut Yankee Atomic Power Company; Haddam Neck Plant; Confirmatory Order... Regulatory Commission (NRC or the Commission) issued a Confirmatory Order to Connecticut Yankee Atomic...

  1. 75 FR 44292 - Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ...-AA90) published in the Federal Register on April 26, 1991 (56 FR 18997); and (C) The Nuclear Energy... contrary to the rationale for rulemaking, as discussed in 56 FR 18997. On October 26 and December 2, 2009... Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of Issuance of...

  2. 76 FR 11521 - Prairie Island Nuclear Generating Plant, Unit 1, Northern States Power Company-Minnesota; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... (76 FR 9827), which informed the public that the Nuclear Regulatory Commission was considering the issuance of amendments to Facility Operating License Nos. DPR-42 and DPR-60, respectively, for the Prairie... COMMISSION Prairie Island Nuclear Generating Plant, Unit 1, Northern States Power Company--Minnesota;...

  3. 75 FR 6225 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... revisions to 10 CFR part 73, as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13967... Requirements, 74 FR 13926, 13967 (March 27, 2009)]. The licensee currently maintains a security system... COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant Units 1 and...

  4. 75 FR 9625 - Northern States Power Company-Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    .... As noted in the final Power Reactor Security Requirements rule (74 FR 13925, March 27, 2009), the... COMMISSION Northern States Power Company--Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2... holder of Facility Operating License Nos. DPR-42 and DPR-60, which authorize operation of the...

  5. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... From the Federal Register Online via the Government Publishing Office ] NUCLEAR REGULATORY COMMISSION Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of... Dr. Tianqing Cao, Senior Seismologist, Office of Nuclear Material Safety and Safeguards, has...

  6. 76 FR 53497 - Florida Power and Light Company; St. Lucie Plant, Units 1 and 2; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... COMMISSION Florida Power and Light Company; St. Lucie Plant, Units 1 and 2; Environmental Assessment and... IV.A.2, for Facility Operating License Nos. DPR-67 and NPF-16, issued to Florida Power and Light... quality or quantity of non- radiological effluents. No changes to the National Pollution...

  7. 75 FR 8410 - Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... notice dated March 27, 2009 (74 FR 13967). There will be no change to radioactive effluents that affect... impact (March 27, 2009, 74 FR 13967). The NRC staff's safety evaluation will be provided as part of a... COMMISSION Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2;...

  8. 75 FR 73134 - Florida Power and Light Company, St. Lucie Plant, Units 1 and 2; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... COMMISSION Florida Power and Light Company, St. Lucie Plant, Units 1 and 2; Environmental Assessment and..., Section 26.9, for Facility Operating License Nos. DPR-67 and NPF-16, issued to Florida Power and Light... National Pollution Discharge Elimination System permit are needed. No effects on the aquatic or...

  9. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... site security plans. The amendments to 10 CFR 73.55 published on March 27, 2009 (74 FR 13926... have a significant effect on the quality of the human environment (75 FR 80545 dated December 22, 2010... COMMISSION Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption...

  10. 75 FR 63213 - Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Northern States Power Company--Minnesota; Prairie Island Nuclear Generating Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering the issuance of an...

  11. 78 FR 49784 - Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3, Notice of Public Meeting on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... (NRC) is correcting a notice that was published in the Federal Register on August 7, 2013 (78 FR 48203... . Correction In the Federal Register (FR) on August 7, 2013, in FR Doc. 2013- 19054, on page 48203, the NRC... COMMISSION Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3, Notice of Public Meeting...

  12. The Edison Responsive Environment Learning System, or the Talking Typewriter Developed by Thomas A. Edison Laboratory, a Subsidiary of McGraw Edison Company.

    ERIC Educational Resources Information Center

    Sanderson, Barbara A.; Kratochvil, Daniel W.

    The "Talking Typewriter" is a computerized electric typewriter with visual and audio capabilities. It was designed to create an environment where learning to read would be a successful, enjoyable experience for the student by allowing him to explore, discover relationships, to progress at his own speed, and to receive feedback. This report…

  13. 76 FR 9348 - Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... Purchase of Excess Electricity Under Assembly Bill 1613, D.09-12-042 (Dec. 21, 2009), (2) Order Dismissing... free). For TTY, call (202) 502-8659. Comment Date: 5 p.m. Eastern Time on February 22, 2011....

  14. 75 FR 11566 - Firstenergy Nuclear Operating Company, Firstenergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28...\\ Requesters should note that the filing requirements of the NRC's E-Filing Rule (72 FR 49139; August 28, 2007... Web site and on the Federal rulemaking Web site Regulations.gov . Because your comments will not...

  15. Life extension of the Boston Edison generation system: the integrated approach

    SciTech Connect

    Flaherty, P.A.; Zimbone, R.A.

    1986-03-01

    In 1982 the Boston Edison Company developed a unique energy program called IMPACT 2000 - Initiatives for Managing Production and Consumption Trends to the Year 2000. As part of the IMPACT 2000 program, BECo looked towards life extension of generating units as a means of providing more reliable and less expensive electricity in the future. There are three factors which must be addressed when examining the potential for life extension of a generating unit: generation/planning considerations, economic considerations, and useful life considerations. Each one of these three factors is examined in detail. There are other variables external to the life extension process which influence as well as impact on a decision to life extend a unit. Among these external variables are: uncertainty of load and fuel cost forecasts, fuel availability, environmental regulations, regulatory constraints, and internal utility cash flow. 4 figures.

  16. 1. Photocopy of photograph (original photograph in Southern California Edison ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of photograph (original photograph in Southern California Edison photo archives). G. Haven Bishop, Photographer, September 26, 1923. BIG CREEK NO. 3 POWERHOUSE NEAR COMPLETION OF CONSTRUCTION. THREE ORIGINAL PENSTOCKS AND THREE ORIGINAL STANDPIPES VISIBLE BEHIND AND ABOVE POWERHOUSE BUILDING. VIEW TO NORTHEAST. - Big Creek Hydroelectric System, Powerhouse 3 Penstock Standpipes, Big Creek, Big Creek, Fresno County, CA

  17. Edison - A New Cray Supercomputer Advances Discovery at NERSC

    SciTech Connect

    Dosanjh, Sudip; Parkinson, Dula; Yelick, Kathy; Trebotich, David; Broughton, Jeff; Antypas, Katie; Lukic, Zarija, Borrill, Julian; Draney, Brent; Chen, Jackie

    2014-02-06

    When a supercomputing center installs a new system, users are invited to make heavy use of the computer as part of the rigorous testing. In this video, find out what top scientists have discovered using Edison, a Cray XC30 supercomputer, and how NERSC's newest supercomputer will accelerate their future research.

  18. Simple Experiments on Magnetism and Electricity...from Edison.

    ERIC Educational Resources Information Center

    Schultz, Robert F.

    Background information, lists of materials needed and procedures used are provided for 16 simple experiments on electricity and magnetism. These experiments are organized into sections dealing with: (1) Edison's carbon experiments (building a galvanometer, investigating the variable conductivity of carbon, and examining the carbon transmitter…

  19. Rodin, Patton, Edison, Wilson, Einstein: Were They Really Learning Disabled?

    ERIC Educational Resources Information Center

    Adelman, Kimberly A.; Adelman, Howard S.

    1987-01-01

    The practice of posthumously diagnosing historical figures is discussed. Emphasis is on the unsatisfactory nature of evidence found for those diagnosed as learning-disabled or dyslexic and the possibility of other explanations for identified problems. Posthumous diagnoses of Auguste Rodin, George Patton, Thomas Edison, Woodrow Wilson, and Albert…

  20. Edison - A New Cray Supercomputer Advances Discovery at NERSC

    ScienceCinema

    Dosanjh, Sudip; Parkinson, Dula; Yelick, Kathy; Trebotich, David; Broughton, Jeff; Antypas, Katie; Lukic, Zarija, Borrill, Julian; Draney, Brent; Chen, Jackie

    2014-06-06

    When a supercomputing center installs a new system, users are invited to make heavy use of the computer as part of the rigorous testing. In this video, find out what top scientists have discovered using Edison, a Cray XC30 supercomputer, and how NERSC's newest supercomputer will accelerate their future research.

  1. The Invention Factory: Thomas Edison's Laboratories. Teaching with Historic Places.

    ERIC Educational Resources Information Center

    Bolger, Benjamin

    This lesson explores the group of buildings in West Orange, New Jersey, built in 1887, that formed the core of Thomas Edison's research and development complex. They consisted of chemistry, physics, and metallurgy laboratories; machine shop; pattern shop; research library; and rooms for experiments. The lesson explains that the prototypes (ideas…

  2. Urban Watershed Research Facility at Edison Environmental Center

    EPA Science Inventory

    The Urban Watershed Research Facility (UWRF) is an isolated, 20-acre open space within EPA’s 200 acre Edison facility established to develop and evaluate the performance of stormwater management practices under controlled conditions. The facility includes greenhouses that allow ...

  3. Implementation of Case-Based Reasoning System for Knowledge Management of Power Plant Construction Projects in a Korean Company

    NASA Astrophysics Data System (ADS)

    Jang, Gil-Sang

    Recently, plant construction industries are enjoying a favorable business climate centering around developing countries and oil producing countries rich in oil money. This paper proposes a methodology of implementing corporation-wide case-based reasoning (CBR) system for effectively managing lessons learned knowledge like experiences and know-how obtained in performing power plant construction projects. Our methodology is consisted of 10 steps: user requirement analysis, information modeling, case modeling, case base design, similarity function design, user interface design, case base building, CBR module development, user interface development, integration test. Also, to illustrate the usability of proposed methodology, the practical CBR system is implemented for the plant construction business division of ’H’ company which has international competitiveness in the field of plant construction industry. At present, our CBR system is successfully utilizing as storing, sharing, and reusing the knowledge which is accumulated in performing power plant construction projects in the target enterprise.

  4. Operational recovery of turbine No. 3 at Potomac Edison`s Dam No. 4 hydrogenerating facility

    SciTech Connect

    Pelczar, R.S.

    1995-12-31

    The Potomac Edison Dam No. 4 hydroelectric generating station is a historic, turn of the century facility located on the Potomac River near Shepherdstown, West Virginia. The station, originally constructed in 1909, employed twin horizontal Francis hydroturbine generating systems. The systems are unique in that the turbines and generators are offset 37 feet, interconnected by rope and sheaves. In May 1989 a third vertical open flume turbine generating system was added to make use of available site capacity. Both the turbine and speed increaser were the largest products developed by their respective manufacturers for a hydro turbine-generator application. This paper will review the subsequent operational experience which led to the original speed increaser failure on unit No. 3 and replacement of the drive system including special design considerations to the replacement speed increaser and its support structure. Specific design challenges included: (1) Designing and implementing a reliable configuration. (2) Reducing operational sound levels. (3) Minimizing harmful structure-borne vibrations which were affecting the internal rotating elements. (4) Incorporating a system brake for emergency and service purposes.

  5. Southern California Edison bets on energy alternatives

    NASA Astrophysics Data System (ADS)

    Riley, W. B.

    1981-08-01

    A 10-MW solar-thermal generating plant and a 100-MW integrated coal-gasification combined cycle (IGCC) power facility are being built to develop a wide range of renewable, alternative power sources by 1990. The solar-thermal generating plant will use steam at 500 C and 100 kg/sq cm to produce 10 MW of electricity. It consists of a 1818 heliostat array, each weighing 1155 kg and having 12 mirrors which are rotated at either 0.25 deg/min (for sun following) or 22.5 deg/min (for major focusing and defocusing). A master control system allows both fully automatic and manual operation, and a beam-characterization system permits the operator to check the alignment of each heliostat individually. A central receiver, consisting of 24 panels of tubing, produces steam at 500 C and 100 kg/sq cm. The thermal storage unit uses crushed granite to absorb 50 kWht/cu m, allowing the plant to operate after sundown. The IGCC plant integrates the coal-gasification plant and the combined-cycle unit, demonstrating operational flexibility and reliability, load-following capability, and compliance with environmental regulations. The gasifier produces 79,300 cu m/h of a mixture of 51% CO and 36% H at 1370 C,and the gas turbine regenerates 65 MW through its own generator.

  6. 19. Photocopy of photograph (original copy in Edison collection). Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of photograph (original copy in Edison collection). Photographer and date unknown, although probably taken before 1920. SOUTH SIDE OF TULE RIVER POWERHOUSE COMPLEX SHOWING OPERATOR COTTAGE AT PHOTO RIGHT AND POWERHOUSE AND TRANSFORMER BUILDING IN BACKGROUND AT PHOTO LEFT. LINE OF BURIED PENSTOCK IS VISIBLE ON SIDE OF HILL AT PHOTO CENTER. VIEW TO NORTH. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  7. 11. Photocopy of photograph (original copy in Edison collection). Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of photograph (original copy in Edison collection). Photographer and date unknown, although photo taken prior to 1930 reconstruction of Project flumes. VIEW OF ORIGINAL SOUTH FORK OF THE TULE RIVER MIDDLE FORK "BOX" WOOD FLUME BRANCH SHOWING NORTH FORK OF TULE RIVER MIDDLE FORK CROSSING. VIEW TO NORTHWEST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  8. NASA Facts: Edison Demonstration of Spacecraft Networks (EDSN) Mission

    NASA Technical Reports Server (NTRS)

    Ord, Stephen; Yost, Bruce D.; Petro, Andrew J.

    2013-01-01

    NASA's Edison Demonstration of Smallsat Networks (EDSN) mission will launch and deploy a swarm of 8 cubesats into a loose formation approximately 500 km above Earth. EDSN will develop technology to send multiple, advanced, yet affordable nanosatellites into space with cross-link communications to enable a wide array of scientific, commercial, and academic research. Other goals of the mission include lowering the cost and shortening the development time for future small spacecraft.

  9. Superfund record of decision (EPA Region 3), Westinghouse Elevator Company Plant, Operable Unit 2, Cumberland Township, Adams County, Gettysburg, PA, March 31, 1995

    SciTech Connect

    1995-04-01

    This Record of Decision (ROD) presents the selected remedial action for Operable Unit 2 (Soils) at the Westinghouse Elevator Company Plant Site in Adams County, Pennsylvania. The selected remedy for the soils at the Westinghouse Elevator Plant is No Additional Action for this Operable Unit. The other alternatives evaluated would produce little or no environmental benefit at substantial cost.

  10. Power plant performance modeling: dynamic model evaluation. [Comparison of MMS and RETRAN codes

    SciTech Connect

    DiDomenico, P.N.; Shor, S.W.W.

    1981-10-01

    The dynamic performance of the turbine and feedwater train of a 550-MW oil-fired plant has been modeled by two modeling systems, the Modular Modeling System (MMS) and the Reactor Transient Analysis System (RETRAN). This report documents the performance of each modeling system and provides results on which the reader may be able to base a judgement as to the usefulness of each system for his modeling purposes. It compares transients simulated by the MMS with those recorded during tests conducted on an operating power plant. Specific information is provided on the type of model constructed, the agreement between blind predictions and measurements, and the level and type of modeling effort required together with computer run time. This program could not have been carried out without the willing support of the Boston Edison Company, which performed the transient tests on its Mystic Unit 7 and provided extensive engineering support to the program through the provision of detailed information on the power plant equipment and systems. It is believed that the insights into plant operation provided by the testing program itself resulted in more than sufficient improvement in plant efficiency to pay for the entire test program, but this could not have been foreseen by Boston Edison when they offered the plant for testing.

  11. Electrical Connections: Letters to Thomas Edison in Response to His Claim of Solving Incandescent Lighting, 1878.

    ERIC Educational Resources Information Center

    Bazerman, Charles

    1994-01-01

    Discusses the way in which letters sent to Thomas Edison following the report that he had solved the problem of incandescent lighting reveal the many discursive worlds that Edison's work touched. Claims these letters indicate how a technological accomplishment is also a multiple, complex social, and communicative accomplishment, creating place and…

  12. 76 FR 34691 - Edison Mission Energy v. Midwest Independent Transmission System Operator, Inc.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Power Act, 16 U.S.C. 824e (2006) and Rule 206 of the Rules of Practice and Procedure of the Federal... NorthStar and Pheasant Ridge wind projects (Edison Wind Projects) (collectively Complainants), filed a...), alleging that Midwest ISO is requiring the Edison Wind Projects to satisfy the M3 milestone...

  13. Montana strikes it rich: Commonwealth Edison Co. v. Montana

    SciTech Connect

    Not Available

    1982-01-01

    The Supreme Court decision in Commonwealth Edison v. Montana confirms the right of states to impose a severance tax on natural resources and the right of Congress to limit the rate of taxation, but it declined to mandate an equitable rate. If other states follow Montana's example and raise their severance taxes, the Court and Congress can avert any effort to form a coal cartel among the Western mining states. This article reviews the issues behind the suit and analyzes the decision. An appendix compares the rate and revenue disposition of the 16 states that impose severance taxes. (DCK)

  14. Success Continues: NASA-Developed Plant Health Measurement Technology is Becoming Big Business for Illinois Company

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Originally produced in 2001, sales of Spectrum Technologies' CM 1000 chlorophyll meter have now topped $290,000 on 140 units. Up-to-date sales figures for 2003 have shown an almost 50% increase over the combined sales totals of 2001 and 2002. The CM 1000 chlorophyll meter identifies the failing health of a plant based on the chlorophyll content of the plant up to 16 days before it is physically detectable by the human eye. Poor health, 'stress' in a plant, is a result of unfavorable growing conditions; lack of nutrients, insufficient water, disease or insect damage.

  15. Neville Chemical Company: Management Pursues Five Projects Following Plant-Wide Energy-Efficiency Assessment

    SciTech Connect

    2003-07-01

    Neville Chemical conducted a plant-wide energy efficiency assessment of its Anaheim, California, plant in the spring of 2002. The assessment justified five projects that would significantly reduce electricity and fuel costs. Four of the five projects, when complete will save 436,200 kilowatt-hours, or $31,840 of electrical energy each year. The remaining project will save 7,473 million British thermal units or $43,600 in fossil fuel each year. One year later, the same assessment team applied its knowledge of Neville's processes in a plant-wide assessment at Neville's Pittsburgh plant, and identified 15 projects with more than $715,000 in projected annual savings.

  16. EPRI Seminar on data acquisition, control, and communications in power plants

    SciTech Connect

    Not Available

    1988-11-01

    An EPRI seminar on data acquisition, control, and communication in power plants was hosted by Southern California Edison Company in San Diego, California from February 23--25, 1988. The seminar participants were from electric utilities, both foreign and domestic; architect engineering firms; computer equipment vendors; software companies and engineering consultants. The proceedings contain the text of the formal presentations. These presentations were grouped in the following seven technical sessions: general overview; technology and standards; communication networks; power plant data management; nuclear power applications; fossil power applications; future trends and research; and electrical systems. In addition to the formal presentations, there were also three working group sessions: communications networks, databases and data management, and data acquisition and control. The working group sessions were held to assess the need for future research projects in these areas. Individual papers have been cataloged separately.

  17. 75 FR 76038 - General Motors Company Formerly Known as General Motors Corporation Willow Run Transmission Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Register on July 26, 2010 (75 FR 43558). The notice was amended on July 30, 2010 to include on-site leased workers from Aerotek. The notice was published in the Federal Register on August 13, 2010 (75 FR 49527... Willow Run Transmission Plant Including On-Site Leased Workers From Aerotek, Securitas, Knight...

  18. 75 FR 14638 - FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... revisions to 10 CFR part 73 as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13967... Requirements, 74 FR 13926, 13967 (March 27, 2009)). The NRC staff's safety evaluation will be provided in the... would not significantly affect plant safety and would not have a significant adverse effect on...

  19. 75 FR 54388 - General Motors Company Formerly Known as General Motors Corporation, Orion Assembly Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... Orion, Michigan. The notice was published in the Federal Register on April 23, 2010 (75 FR 21355). At..., Orion Assembly Plant Including On-Site Leased Workers From Aerotek Automotive Lake Orion, MI; Amended... leased from Aerotek Automotive were employed on-site at the Lake Orion, Michigan location of...

  20. 75 FR 67770 - General Motors Company, Formerly Known as General Motors Corporation, Orion Assembly Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... Register on April 23, 2010 (75 FR 21355). The notice was amended on August 25, 2010 to include on-site..., 2010 (75 FR 54388). At the request of the State agency, the Department reviewed the certification for..., Orion Assembly Plant, Including On-Site Leased Workers From Aerotek Automotive, Ryder and...

  1. Exploring Distributed Energy Alternatives to Electrical Distribution Grid Expansion in Souhern California Edison Service Territory

    SciTech Connect

    Stovall, Therese K; Kingston, Tim

    2005-12-01

    Distributed energy (DE) technologies have received much attention for the energy savings and electric power reliability assurances that may be achieved by their widespread adoption. Fueling the attention have been the desires to globally reduce greenhouse gas emissions and concern about easing power transmission and distribution system capacity limitations and congestion. However, these benefits may come at a cost to the electric utility companies in terms of lost revenue and concerns with interconnection on the distribution system. This study assesses the costs and benefits of DE to both consumers and distribution utilities and expands upon a precursory study done with Detroit Edison (DTE)1, by evaluating the combined impact of DE, energy-efficiency, photovoltaics (a use of solar energy), and demand response that will shape the grid of the future. This study was funded by the U.S. Department of Energy (DOE), Gas Research Institute (GRI), American Electric Power (AEP), and Gas Technology Institute's (GTI) Distributed Energy Collaborative Program (DECP). It focuses on two real Southern California Edison (SCE) circuits, a 13 MW suburban circuit fictitiously named Justice on the Lincoln substation, and an 8 MW rural circuit fictitiously named Prosper on the Washington Substation. The primary objectives of the study were threefold: (1) Evaluate the potential for using advanced energy technologies, including DE, energy-efficiency (EE), demand response, electricity storage, and photovoltaics (PV), to reshape electric load curves by reducing peak demand, for real circuits. (2) Investigate the potential impact on guiding technology deployment and managing operation in a way that benefits both utilities and their customers by: (a) Improving grid load factor for utilities; (b) Reducing energy costs for customers; and (c) Optimizing electric demand growth. (3) Demonstrate benefits by reporting on a recently installed advanced energy system at a utility customer site. This

  2. Southern California Edison High Penetration Photovoltaic Project - Year 1

    SciTech Connect

    Mather, B.; Kroposki, B.; Neal, R.; Katiraei, F.; Yazdani, A.; Aguero, J. R.; Hoff, T. E.; Norris, B. L.; Parkins, A.; Seguin, R.; Schauder, C.

    2011-06-01

    This report discusses research efforts from the first year of a project analyzing the impacts of high penetration levels of photovoltaic (PV) resources interconnected onto Southern California Edison's (SCE's) distribution system. SCE will be interconnecting a total of 500 MW of commercial scale PV within their service territory by 2015. This Year 1 report describes the need for investigating high-penetration PV scenarios on the SCE distribution system; discusses the necessary PV system modeling and distribution system simulation advances; describes the available distribution circuit data for the two distribution circuits identified in the study; and discusses the additional inverter functionality that could be implemented in order to specifically mitigate some of the undesirable distribution system impacts caused by high-penetration PV installations.

  3. Monitoring of the Permeable Pavement Demonstration Site at the Edison Environmental Center (Poster)

    EPA Science Inventory

    This is a poster on the permeable pavement parking lot at the Edison Environmental Center. The monitoring scheme for the project is discussed in-depth with graphics explaining the instrumentation installed at the site.

  4. 77 FR 65909 - Southern California Edison Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... delegation by the Commission, see 37 FR 28,710 (Dec. 29, 1972), and the Commission's regulations, see 10 CFR... hearing published in the Federal Register on August 16, 2012 (77 FR 49,463), a hearing request was... promulgated in August 2007 (72 FR 49,139). Issued at Rockville, Maryland, this 25th day of October 2012....

  5. 75 FR 61456 - Southern California Edison Company; Notice of Application for Amendment of License, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... Creek below Lundy Lake. The applicant is also requesting a new Article 411-A that requires a plan for engineering, permitting, construction, and operation of the proposed modified powerhouse tailrace...

  6. 75 FR 81265 - Southern California Edison Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... will facilitate the development of over 3,700 MW of wind and solar generation. Any person desiring to....gov , using the ``eLibrary'' link and is available for review in the Commission's Public...

  7. 75 FR 70707 - Detroit Edison Company; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... in Monroe County, Michigan. Therefore, as required by 10 CFR 51.21, the NRC performed an... State official, Mr. Ken Yale, of the Michigan Department of Natural Resources and Environment regarding... copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public...

  8. 75 FR 11946 - Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... revisions to 10 CFR Part 73 as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13967... Requirements, 74 FR 13926, 13967 (March 27, 2009)]. The licensee currently maintains a security system... operation of the Fermi 2, located in Monroe County, Michigan. In accordance with 10 CFR 51.21, the...

  9. Status of the Southern California Edison Company 3 MW Wind Turbine Generator (WTG) demonstration project

    NASA Technical Reports Server (NTRS)

    Scheffler, R. L.

    1979-01-01

    To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.

  10. 76 FR 6836 - Southern California Edison Company; Notice of Withdrawal of Application for Amendments to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Notice of Consideration of Issuance of Amendment published in the Federal Register on May 18, 2010 (75 FR... (SONGS), Units 2 and 3, respectively, located in San Diego County, California. The proposed...

  11. 75 FR 12580 - Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... March 27, 2009 (74 FR 13926). There will be no change to radioactive effluents that affect radiation... impact [Part 73, Power Reactor Security Requirements, 74 FR 13926 (March 27, 2009)]. With its request to... Onofre Nuclear Generating Station, Units 2 and 3 (SONGS 2 and 3), located in San Diego County,...

  12. 75 FR 69136 - Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... Register notice dated March 27, 2009; 74 FR 13926. There will be no change to radioactive effluents or... 73, Power Reactor Security Requirements, March 27, 2009; 74 FR 13926). Thus, through the proposed... Onofre Nuclear Generating Station, Units 2 and 3 (SONGS 2 and 3), located in San Diego County,...

  13. Lead abatement system cuts corners, costs for utility company

    SciTech Connect

    Fuller, B.

    1996-11-01

    When Consolidated Edison Co. (New York) called for bids to remove lead from the 125-foot-tall steam-dispersion stacks at its Astoria Power Generating Station, the company specified that no lead could be released into the environment during the project. Another restriction was that any abrasive blasting for surface preparation would have to be accompanied by full-scale containment--including use of airtight seals, ventilation systems, entrance and exit air locks, and impermeable containment material--to ensure minimal discharge to the generating plant below the stack. Prospective contractors also would be required to meet Occupational Safety and Health Administration standards for medical surveillance, hygiene facilities, eating areas and personal protective equipment if lead levels exceeded 30 micrograms per cubic meter. To reduce the cost of erecting and maintaining full containment without jeopardizing health and safety criteria, Con Ed incorporated a practical solution to remove its aging, lead-based paint. The technology, comprised of a Vac-Pac{reg_sign} self-drumming HEPA filtration system, supports up to 10 operators using proprietary scalers and needleguns. The scalers are effective for flat areas, removing coatings at 45 square feet per hour, while the needleguns are designed for use on corners, edges, rivets and bolts.

  14. Report on Preliminary Engineering Study for Installation of an Air Cooled Steam Condenser at Brawley Geothermal Plant, Unit No. 1

    SciTech Connect

    1982-03-01

    The Brawley Geothermal Project comprises a single 10 MW nominal geothermal steam turbine-generator unit which has been constructed and operated by the Southern California Edison Company (SCE). Geothermal steam for the unit is supplied through contract by Union Oil Company which requires the return of all condensate. Irrigation District (IID) purchases the electric power generated and provides irrigation water for cooling tower make-up to the plant for the first-five years of operation, commencing mid-1980. Because of the unavailability of irrigation water from IID in the future, SCE is investigating the application and installation of air cooled heat exchangers in conjunction with the existing wet (evaporative) cooling tower with make-up based on use of 180 gpm (nominal) of the geothermal condensate which may be made available by the steam supplier.

  15. Reliability analysis of a utility-scale solar power plant

    NASA Astrophysics Data System (ADS)

    Kolb, G. J.

    1992-10-01

    This paper presents the results of a reliability analysis for a solar central receiver power plant that employs a salt-in-tube receiver. Because reliability data for a number of critical plant components have only recently been collected, this is the first time a credible analysis can be performed. This type of power plant will be built by a consortium of western US utilities led by the Southern California Edison Company. The 10 MW plant is known as Solar Two and is scheduled to be on-line in 1994. It is a prototype which should lead to the construction of 100 MW commercial-scale plants by the year 2000. The availability calculation was performed with the UNIRAM computer code. The analysis predicted a forced outage rate of 5.4 percent and an overall plant availability, including scheduled outages, of 91 percent. The code also identified the most important contributors to plant unavailability. Control system failures were identified as the most important cause of forced outages. Receiver problems were rated second with turbine outages third. The overall plant availability of 91 percent exceeds the goal identified by the US utility study. This paper discuses the availability calculation and presents evidence why the 91 percent availability is a credible estimate.

  16. 75 FR 71152 - Southern California Edison; San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern California Edison; San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption 1.0 Background Southern California Edison (SCE, the licensee) is the holder of the Facility Operating License Nos. NPF-10 and NPF-15, which...

  17. 75 FR 14211 - Southern California Edison, San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Southern California Edison, San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption 1.0 Background Southern California Edison (SCE, the licensee) is the holder of the Facility Operating License Nos. NPF-10 and NPF-15, which...

  18. THE DEVELOPMENT OF A BEGINNING READING SKILLS PROGRAM USING THE EDISON RESPONSIVE ENVIRONMENTS INSTRUMENT. SECOND PROGRESS REPORT.

    ERIC Educational Resources Information Center

    GOTKIN, LASSAR G.; MCSWEENEY, JOSEPH

    THE SECOND PROGRESS REPORT OF A PROJECT UTILIZING A COMPLEX TEACHING MACHINE, THE EDISON RESPONSIVE ENVIRONMENT INSTRUMENT, TO STUDY THE ACQUISITION OF BEGINNING READING SKILLS BY 5-YEAR-OLDS FROM DISADVANTAGED BACKGROUNDS IS PRESENTED. THE FIRST REPORT DESCRIBED THE EDISON RESPONSIVE ENVIRONMENT INSTRUMENT AND DISCUSSED THE PROGRAMING DEVELOPED…

  19. Do not disturb the animals! or, how Con Edison saved $300,000 using a trenchless technology to renew 3,000 feet of leaking gas main at the Bronx Zoo

    SciTech Connect

    Bufe, M.

    1995-07-01

    Every leaking gas main presents a challenge. But when that leaking main follows a series of sweeping bends on its route through North America`s largest urban wildlife park, it presents a special challenge. That was the situation Consolidated Edison Company of New York Inc. recently faced when numerous leaks were discovered along 3,000 feet of a 95-year-old, 12-inch cast-iron main that winds through New York City`s Bronx Zoo. Con Edison knew it needed a long-term solution to this increasingly common problem. Thanks to the cooperative efforts of the utility`s operations and research departments and the Gas Research Institute (GRI), Con Edison also knew about a trenchless technology that could renew the pipe with minimal impact to the environment--while saving the utility a substantial sum of money in the process. In the Paltem system, a woven polyester hose is injected with an epoxy resin and then inverted (turned inside out) into a pipe at an access pit. The liner then bonds to the inside wall of the pipe, forming a smooth, flexible and pressure-resistant lining. The process is environmentally safe, requires very little excavation and can be installed in days, rather than the weeks or months it can take to dig up and replace existing pipe.

  20. Thermal Modeling and Testing of the Edison Demonstration of Smallsat Networks Project

    NASA Technical Reports Server (NTRS)

    Coker, Robert

    2014-01-01

    NASA's Edison program is intending to launch the Edison Demonstration of Smallsat Networks (EDSN) project, a swarm of 8 1.5U cubesats in the fall of 2014 to demonstrate intra-swarm communications and multi-point in situ space physics data acquisition. Due to late changes in the duty cycles of various components, potential overheating issues appeared. In addition, it was determined that capacity loss due to the coldness of the batteries was unacceptable, so mitigation was required. This paper will discuss the thermal modeling, testing, and results of the EDSN mission.

  1. Trial application of guidelines for nuclear plant response to an earthquake. Final report

    SciTech Connect

    Schmidt, W.; Oliver, R.; O`Connor, W.

    1993-09-01

    Guidelines have been developed to assist nuclear plant personnel in the preparation of earthquake response procedures for nuclear power plants. These guidelines are published in EPRI report NP-6695, ``Guidelines for Nuclear Plant Response to an Earthquake,`` dated December 1989. This report includes two sets of nuclear plant procedures which were prepared to implement the guidelines of EPRI report NP-6695. The first set were developed by the Toledo Edison Company Davis-Besse plant. Davis-Besse is a pressurized water reactor (PWR) and contains relatively standard seismic monitoring instrumentation typical of many domestic nuclear plants. The second set of procedures were prepared by Yankee Atomic Electric Company for the Vermont Yankee facility. This plant is a boiling water reactor (BWR) with state-of-the-art seismic monitoring and PC-based data processing equipment, software developed specifically to implement the OBE Exceedance Criterion presented in EPRI report NP-5930, ``A Criterion for Determining Exceedance of the operating Basis Earthquake.`` The two sets of procedures are intended to demonstrate how two different nuclear utilities have interpreted and applied the EPRI guidance given in report NP-6695.

  2. Rainwater collection and management from roofs at the Edison Environmental Center

    EPA Science Inventory

    In the past, the EPA’s Edison Environmental Center, a 200 acre federal run facility, directed all rainwater from roofed areas to the existing stormwater conveyance system. Over the last several years, modifications have been made to the practice of discharging stormwater to the e...

  3. SURVEY OF FLUE GAS DESULFURIZATION SYSTEMS: ST. CLAIR STATION, DETROIT EDISON CO

    EPA Science Inventory

    The report gives results of a survey of the flue gas desulfurization (FGD) system retrofitted on Unit 6 of Detroit Edison Co.'s St. Clair Station. The experimental FGD system, which operated through a 2-month (October 1976-January 1977) demonstration program, utilized a limestone...

  4. The Con Edison Emergency Child Care Plan for Management Employees: Summary Plan Description.

    ERIC Educational Resources Information Center

    Consolidated Edison Co., Brooklyn, NY.

    This summary plan description offers guidelines for participation in a pilot program that provides short-term emergency care for children of Con Edison managers who are under 13 years old. The plan offers professional, in-home child care that can be used when usual arrangements have collapsed. The summary plan description addresses the following…

  5. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site - Abstract

    EPA Science Inventory

    The EPA’s Urban Watershed Management Branch (UWMB) is monitoring an instrumented, working, 110-space pervious pavement parking at EPA’s Edison Environmental Center (EEC). Permeable pavement systems are classified as stormwater best management practices (BMPs) which reduce runo...

  6. A Principal's Story. Two-Year Effort To Turn around Edison Elementary School in San Francisco.

    ERIC Educational Resources Information Center

    Romines, Ken

    In this memoir, a principal recounts the story of his 2 years at Edison Elementary School in San Francisco (CA), a school that was called the worst school in California. The students had the worst standardized test scores in the district, and racial discord and playground violence were common. The school was facing the threat of reconstitution,…

  7. Permeable Pavement Monitoring at the Edison Environmental Center Demonstration Site - presentation

    EPA Science Inventory

    The EPA’s Urban Watershed Management Branch has been monitoring an instrumented 110-space pervious pavement parking lot. The lot is used by EPA personnel and visitors to the Edison Environmental Center. The design includes 28-space rows of three permeable pavement types: asphal...

  8. EPA’s permeable pavement research and the Edison Environmental Center

    EPA Science Inventory

    A deteriorated parking area on EPA’s Edison Environmental Center needed replacement. The replacement offered an opportunity for the facility managers to reduce the impervious footprint and the reduce stormwater runoff volume. This also provided researchers from the National Risk ...

  9. 76 FR 28025 - Edison Mission Holding Beach, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Energy Regulatory Commission Edison Mission Holding Beach, LLC; Notice of Petition for Declaratory Order... Mission Holding Beach, LLC (EMHB) filed a petition for declaratory order requesting that the Federal...), that it will acquire from, and then lease back to their current owner, AES Huntington Beach, LLC....

  10. Industrial hygiene walk-through survey report of the Goodyear Tire and Rubber Company, Houston Chemical Plant, Houston, Texas

    SciTech Connect

    Fajen, J.M.; Ungers, L.J.

    1986-04-01

    A walk-through survey was conducted at Goodyear Tire and Rubber Company, Houston, Texas in November, 1985. The purpose of the survey was to obtain information on production processes for styrene/butadiene rubber, styrene/butadiene latex and acrylonitrile/butadiene rubber, and to evaluate the potential for 1,3-butadiene exposure.

  11. 78 FR 14361 - In the Matter of Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Units 1 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... change of control of EFH, EFCH, or Luminant as a result of this internal restructuring. No physical... January 2, 2013 (78 FR 119), and a correction notice was published on January 10, 2013 (78 FR 2295). No... Proposed Internal Restructuring and Indirect Transfer of License I Luminant Generation Company...

  12. Edison Electric, Exxon Push Nuclear Power in Nation's Classrooms

    ERIC Educational Resources Information Center

    Feldman, Dede

    1978-01-01

    Pro-nuclear power "educational materials" designed or promoted by energy and utility companies lack objectivity about alternative energy resources. A free comic book distributed to public schools in New Mexico and a simulation game supplied to Maryland public schools at the expense of utility customers are described. (SW)

  13. Human Resource Development and New Technology in the Automobile Industry: A Case Study of Ford Motor Company's Dearborn Engine Plant. The Development and Utilization of Human Resources in the Context of Technological Change and Industrial Restructuring.

    ERIC Educational Resources Information Center

    Chen, Kan; And Others

    This report centers around a plant-level study of the development and utilization of human resources in the context of technological change and industrial restructuring in the crankshaft production area of Ford Motor Company's Dearborn Engine Plant (DEP). The introductory chapter describes how the study was conducted, provides an introduction to…

  14. North Star Steel Company: Iowa Mini-Mill Conducts Plant-Wide Energy Assessment Using a Total Assessment Audit

    SciTech Connect

    2004-08-01

    North Star Steel completed a plant-wide energy assessment at its plant in Wilton, Iowa. The assessment identified potential annual savings of 140,000 MMBtu in natural gas, nearly 39 million kWh in electricity, and more than $2.6 million.

  15. 78 FR 26663 - Exelon Generation Company, LLC, License Renewal of Nuclear Plants and Public Meetings for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... Statement for License Renewal of Nuclear Plants (GEIS), NUREG-1437, regarding the renewal of operating...-397-4209, 301-415- 4737, or by email to pdr.resource@nrc.gov . The draft GEIS, NUREG-1437,...

  16. Thermal Modeling in Support of the Edison Demonstration of Smallsat Networks Project

    NASA Technical Reports Server (NTRS)

    Coker, Robert F.

    2013-01-01

    NASA's Edison program is intending to launch a swarm of at least 8 small satellites in 2013. This swarm of 1.5U Cubesats, the Edison Demonstration of Smallsat Networks (EDSN) project, will demonstrate intra-swarm communications and multi-point in-situ space physics data acquisition. In support of the design and testing of the EDSN satellites, a geometrically accurate thermal model has been constructed. Due to the low duty cycle of most components, no significant overheating issues were found. The predicted mininum temperatures of the external antennas are low enough, however, that some mitigation may be in order. The development and application of the model will be discussed in detail.

  17. Inferred relation of Miocene Bealville Fanglomerate to Edison Fault, Caliente Canyon area, Kern County, California

    SciTech Connect

    Dibblee, T.W. Jr.; Warne, A.H.

    1986-04-01

    The Bealville Fanglomerate is a very coarse, local, eastern torrential facies of the middle Tertiary marine sedimentary sequence of southern San Joaquin basin. This fanglomerate is exposed in lower Caliente Canyon east of Bakersfield. It is composed of unsorted boulder-size detritus of granitic rocks now exposed in the highlands on the east and south. The fanglomerate intertongues northwestward into the overlying Miocene fluvial Bena Gravel and probably partly into the underlying Oligocene-Miocene fluvial Walker Formation. In its eastern exposure, the Bealville Fanglomerate laps onto granitic basement. The Bealville Fanglomerate, as thick as 7000 ft (2200 m), dips southward into the north-dipping Edison fault. Pre-Tertiary granitic basement was elevated on the Edison fault to the south when the fault was contemporaneously active during the Miocene. Both the fanglomerate terrane north of the fault and the adjacent granitic basement terrane south of it are now eroded to low relief, so the fault is not expressed physiographically and is inactive. In contrast, the active White Wolf fault to the southeast is expressed by the northwest-facing escarpment slope of Bear Mountain. The Bealville Fanglomerate was deposited during the early and middle Miocene as coarse alluvial detritus on the western base of the rising Sierra Nevada uplift of granitic terrane. This southward-dipping fanglomerate is coarser and thicker than other formations deposited on the eastern margin of the San Joaquin basin. These conditions indicate that the fanglomerate was deposited rapidly on a southward-tilting block against a block of granitic basement being elevated on the Edison fault to the south, and it was derived from the adjacent granitic terrane to the east and from that elevated on the Edison fault to the south.

  18. Final report on the power production phase of the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant

    SciTech Connect

    Radosevich, L.G.

    1988-03-01

    This report describes the evaluations of the power production testing of Solar One, the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant near Barstow, California. The Pilot Plant, a cooperative project of the US Department of Energy and utility firms led by the Southern California Edison Company, began a three year period of power production operation in August 1984. During this period, plant performance indicators, such as capacity factor, system efficiency, and availability, were studied to assess the operational capability of the Pilot Plant to reliably supply electrical power. Also studied was the long-term performance of such key plant components as the heliostats and the receiver. During the three years of power production, the Pilot Plant showed an improvement in performance. Considerable increases in capacity factor, system efficiency, and availability were achieved. Heliostat operation was reliable, and only small amounts of mirror corrosion were observed. Receiver tube leaks did occur, however, and were the main cause of the plant's unscheduled outages. The Pilot Plant provided valuable lessons which will aid in the design of future solar central receiver plants. 53 refs., 46 figs., 4 tabs.

  19. Ten years of solar power plant operation in the Mojave Desert

    SciTech Connect

    Cohen, G.E.; Frier, S.D.

    1997-12-31

    Nine Solar Electric Generating Systems (SEGS), ranging from 13.8 to 80 MWe of rated name plate capacity, have been operating on a commercial basis in the Mojave desert of southern California since the mid-1980s. Each facility was developed as an Independent Power Producer (IPP) which sells power to the Southern California Edison Company (SCE). The nine SEGS plants provide a combined capacity of 354 MWe, and produce over 90% of the solar electric generation in the world. The SEGS plants utilize large fields of parabolic trough Solar Collector Assemblies (SCAs) supplying thermal energy to produce steam for a Rankine steam turbine/generator cycle. The parabolic trough SCAs have silvered low-iron glass reflectors which focus direct solar radiation on an efficient evacuated receiver, or Heat Collection Element (HCE). After reviewing the technology and plant characteristics, this paper will describe the trends in performance and operating experience over the last ten years. As part of the plant improvements, the paper will also describe the cost-shared program for SEGS III-VII between Sandia National Laboratories and KJC Operating Company (KJC OC). Functioning since 1992, this program is intended to reduce operating and maintenance cost by developing new management methods and technical improvements.

  20. Experience in the commercial operation of the pilot asynchronized turbogenerator T3FA-110 at cogeneration plant-22 (TETs-22) of the Mosenergo Company

    SciTech Connect

    Zinakov, V. E.; Chernyshev, E. V.; Kuzin, G. A.; Voronov, V. K.; Labunets, I. A.

    2006-01-15

    Results of commercial operation of a world pioneer asynchronized turbogenerator T3FA-110 with a capacity of 11 MW and full air cooling at a cogeneration plant are presented. The turbogenerator developed jointly by the Electric Power Research Institute and the Elektrosila Company differs from traditional synchronous generators by the presence on the rotor of two mutually orthogonal windings, a two-channel reverse thyristor excitation system, and a special control system. The special features of design and control allow such generators to operate in the modes of both production and high consumption of reactive power at normal static and dynamic stability. This widens the range of regulation of the voltage level in the connected electric network and makes it possible to bring parallel-connected synchronous generators to optimum operation conditions. The generator can work without excitation for a long time at 70% load. Commercial operation of the pilot T3FA-110 turbogenerator started in December 2003 at TETs-22 of the Mosenergo Company and has proved its full correspondence to the design engineering parameters. A program of wide use of such turbogenerators in the United Power System of Russia (RAO 'EES Rossii' Co.) has been developed.

  1. Northern States Power Company (NSP) Black Dog generating plant - Unit 2 emission reduction, capacity increase and life extension through atmospheric fluidized bed combustion (AFBC) retrofit

    SciTech Connect

    Jenness, B.L.; Rosendahl, S.M.; Gamble, R.L.

    1985-08-01

    The authors report on progress to date of the atmospheric fluidized-bed combustion (AFBC) boiler retrofit at the Black Dog Unit 2 plant of the Northern States Power Company. Construction began in September 1984 after the completion of technical and economic feasibility studies, and initial operation is scheduled for the second quarter of 1986. The project features the largest AFBC boiler to date, a 40 MW capacity regain/upgrade, and 25-year extension of unit life, low leakage regenerative air preheater design, electrostatic precipitator performance improvement, alternate fuel co-firing capacity, and reduced emission on a per MW basis. The authors describe the management and engineering developments associated with the project. 12 figures, 4 tables.

  2. Parametric study of prospective early commercial MHD power plants (PSPEC). General Electric Company, task 1: Parametric analysis

    NASA Technical Reports Server (NTRS)

    Marston, C. H.; Alyea, F. N.; Bender, D. J.; Davis, L. K.; Dellinger, T. C.; Hnat, J. G.; Komito, E. H.; Peterson, C. A.; Rogers, D. A.; Roman, A. J.

    1980-01-01

    The performance and cost of moderate technology coal-fired open cycle MHD/steam power plant designs which can be expected to require a shorter development time and have a lower development cost than previously considered mature OCMHD/steam plants were determined. Three base cases were considered: an indirectly-fired high temperature air heater (HTAH) subsystem delivering air at 2700 F, fired by a state of the art atmospheric pressure gasifier, and the HTAH subsystem was deleted and oxygen enrichment was used to obtain requisite MHD combustion temperature. Coal pile to bus bar efficiencies in ease case 1 ranged from 41.4% to 42.9%, and cost of electricity (COE) was highest of the three base cases. For base case 2 the efficiency range was 42.0% to 45.6%, and COE was lowest. For base case 3 the efficiency range was 42.9% to 44.4%, and COE was intermediate. The best parametric cases in bases cases 2 and 3 are recommended for conceptual design. Eventual choice between these approaches is dependent on further evaluation of the tradeoffs among HTAH development risk, O2 plant integration, and further refinements of comparative costs.

  3. SUNBURN: A computer code for evaluating the economic viability of hybrid solar central receiver electric power plants

    SciTech Connect

    Chiang, C.J.

    1987-06-01

    The computer program SUNBURN simulates the annual performance of solar-only, solar-hybrid, and fuel-only electric power plants. SUNBURN calculates the levelized value of electricity generated by, and the levelized cost of, these plants. Central receiver solar technology is represented, with molten salt as the receiver coolant and thermal storage medium. For each hour of a year, the thermal energy use, or dispatch, strategy of SUNBURN maximizes the value of electricity by operating the turbine when the demand for electricity is greatest and by minimizing overflow of thermal storage. Fuel is burned to augment solar energy if the value of electricity generated by using fuel is greater than the cost of the fuel consumed. SUNBURN was used to determine the optimal power plant configuration, based on value-to-cost ratio, for dates of initial plant operation from 1990 to 1998. The turbine size for all plants was 80 MWe net. Before 1994, fuel-only was found to be the preferred plant configuration. After 1994, a solar-only plant was found to have the greatest value-to-cost ratio. A hybrid configuration was never found to be better than both fuel-only and solar-only configurations. The value of electricity was calculated as The Southern California Edison Company's avoided generation costs of electricity. These costs vary with time of day. Utility ownership of the power plants was assumed. The simulation was performed using weather data recorded in Barstow, California, in 1984.

  4. Interior. Apparatus used in crushing and processing plant fibers to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior. Apparatus used in crushing and processing plant fibers to extract latex from the sap during experiments to find native North American plant which would yield sufficiently high percentage of latex to produce natural rubber. - Thomas A. Edison Laboratories, Building No. 2, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  5. Southern Company`s standby generator program

    SciTech Connect

    Swartz, S.

    1995-12-01

    Alabama Power Company (APCO) continues to look for ways to improve customer satisfaction and enact demand-side management programs. The decision was made to evaluate the availability of customer-owned generators in order to meet these objectives. The idea was to utilize customer-owed standby generators (SG) as we would a peaking plant and to pay the customer credits based on the cost of the construction of peaking capacity plants. It was felt that if APCO could utilize this capacity to offset the construction of peaking capacity, then these costs would be passed on to our customers.

  6. Tools and data acquisition of borehole geophysical logging for the Florida Power and Light Company Turkey Point Power Plant in support of a groundwater, surface-water, and ecological monitoring plan, Miami-Dade County, Florida

    USGS Publications Warehouse

    Wacker, Michael A.

    2010-01-01

    Borehole geophysical logs were obtained from selected exploratory coreholes in the vicinity of the Florida Power and Light Company Turkey Point Power Plant. The geophysical logging tools used and logging sequences performed during this project are summarized herein to include borehole logging methods, descriptions of the properties measured, types of data obtained, and calibration information.

  7. PREFACE: 19th International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON'19)

    NASA Astrophysics Data System (ADS)

    González, T.; Martín-Martínez, M. J.; Mateos, J.

    2015-10-01

    The 19th International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON'19) was held at the Hospedería Fonseca (Universidad de Salamanca, Spain), on 29 June - 2 July, 2015, and was organized by the Electronics Area from the University of Salamanca. The Conference is held biannually and covers the recent progress in the field of electron dynamics in solid-state materials and devices. This was the 19th meeting of the international conference series formerly named Hot Carriers in Semiconductors (HCIS), first held in Modena in 1973. In the edition of 1997 in Berlin the name of the conference changed to International Conference on Nonequilibrium Carrier Dynamics in Semiconductors, keeping the same acronym, HCIS; and finally in the edition of Montpellier in 2009 the name was again changed to the current one, International Conference on Electron Dynamics in Semiconductors, Optoelectronics and Nanostructures (EDISON). The latest editions took place in Santa Barbara, USA, in 2011 and Matsue, Japan, in 2013. Research work on electron dynamics involves quite different disciplines, and requires both fundamental and technological scientific efforts. Attendees to the conference come mostly from academic institutions, belonging to both theoretical and experimental groups working in a variety of fields, such as solid-state physics, electronics, optics, electrical engineering, material science, laser physics, etc. In this framework, events like the EDISON conference become a basic channel for the progress in the field. Here, researchers working in different areas can meet, present their latest advances and exchange their ideas. The program of EDISON'19 included 13 invited papers, 61 oral contributions and 73 posters. These contributions originated from scientists in more than 30 different countries. The Conference gathered 140 participants, coming from 24 different countries, most from Europe, but also with a significant participation

  8. EDISON-WMW: Exact Dynamic Programing Solution of the Wilcoxon–Mann–Whitney Test

    PubMed Central

    Marx, Alexander; Backes, Christina; Meese, Eckart; Lenhof, Hans-Peter; Keller, Andreas

    2016-01-01

    In many research disciplines, hypothesis tests are applied to evaluate whether findings are statistically significant or could be explained by chance. The Wilcoxon–Mann–Whitney (WMW) test is among the most popular hypothesis tests in medicine and life science to analyze if two groups of samples are equally distributed. This nonparametric statistical homogeneity test is commonly applied in molecular diagnosis. Generally, the solution of the WMW test takes a high combinatorial effort for large sample cohorts containing a significant number of ties. Hence, P value is frequently approximated by a normal distribution. We developed EDISON-WMW, a new approach to calculate the exact permutation of the two-tailed unpaired WMW test without any corrections required and allowing for ties. The method relies on dynamic programing to solve the combinatorial problem of the WMW test efficiently. Beyond a straightforward implementation of the algorithm, we presented different optimization strategies and developed a parallel solution. Using our program, the exact P value for large cohorts containing more than 1000 samples with ties can be calculated within minutes. We demonstrate the performance of this novel approach on randomly-generated data, benchmark it against 13 other commonly-applied approaches and moreover evaluate molecular biomarkers for lung carcinoma and chronic obstructive pulmonary disease (COPD). We found that approximated P values were generally higher than the exact solution provided by EDISON-WMW. Importantly, the algorithm can also be applied to high-throughput omics datasets, where hundreds or thousands of features are included. To provide easy access to the multi-threaded version of EDISON-WMW, a web-based solution of our algorithm is freely available at http://www.ccb.uni-saarland.de/software/wtest/. PMID:26829645

  9. PROCEEDINGS OF WORKSHOP ON MICROORGANISMS IN URBAN STORMWATER HELD AT EDISON, NEW JERSEY, ON MARCH 24, 1975

    EPA Science Inventory

    This workshop was held on March 29, 1975 at the USEPA Office, Edison, New Jersey. The aim was to exchange information obtained from USEPA Office of Research and Development, Storm and Combined Sewer Program sponsored projects so as to foster a better understanding of microorganis...

  10. SunEdison Photovoltaic Grid Integration Evaluation: Cooperative Research and Development Final Report, CRADA Number CRD-08-302

    SciTech Connect

    Kroposki, B.

    2012-09-01

    Under this Agreement, NREL will work with SunEdison to monitor and analyze the performance of photovoltaic (PV) systems as they relate to grid integration. Initially this project will examine the performance of PV systems with respect to evaluating the benefits and impacts on the electric power grid.

  11. Three Permeable Pavements Performances for Priority Metal Pollutants and Metals associated with Deicing Chemicals from Edison Parking Lot, NJ - abstract

    EPA Science Inventory

    The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)]. Samples of each p...

  12. Three Permeable Pavements Performances for Priority Metal Pollutants and Metals Associated with Deicing Chemicals from Edison Parking Lot, NJ

    EPA Science Inventory

    The U.S. Environmental Protection Agency constructed a 4000-m2 parking lot in Edison, New Jersey in 2009. The parking lot is surfaced with three permeable pavements [permeable interlocking concrete pavers (PICP), pervious concrete (PC), and porous asphalt (PA)]. Samples of each p...

  13. Creating a Culture of Data Use for Continuous Improvement: A Case Study of an Edison Project School

    ERIC Educational Resources Information Center

    Sutherland, Stephanie

    2004-01-01

    In this article, I outline how, with the appropriate mix of external requirements and internal motivation, structure and capacity, a school can promote and maintain a culture of evaluative practices, specifically data use, for continuous improvement. I draw upon qualitative data conducted in a study of an Edison Project school. The findings from…

  14. STATUS OF EPA'S (ENVIRONMENTAL PROTECTION AGENCY'S) LIMB (LIMESTONE INJECTION MULTISTAGE BURNER) DEMONSTRATION PROGRAM AT OHIO EDISON'S EDGEWATER UNIT 4

    EPA Science Inventory

    The paper describes and discusses the key design features of the retrofit of EPA's Limestone Injection Multistage Burner (LIMB) system to an operating, wall-fired utility boiler at Ohio Edison's Edgewater Station. It further describes results of the pertinent projects in EPA's LI...

  15. Commercial low-Btu coal-gasification plant. Feasibility study: General Refractories Company, Florence, Kentucky. Volume I. Project summary. [Wellman-Galusha

    SciTech Connect

    1981-11-01

    In response to a 1980 Department of Energy solicitation, the General Refractories Company submitted a Proposal for a feasibility study of a low Btu gasification facility for its Florence, KY plant. The proposed facility would substitute low Btu gas from a fixed bed gasifier for natural gas now used in the manufacture of insulation board. The Proposal from General Refractories was prompted by a concern over the rising costs of natural gas, and the anticipation of a severe increase in fuel costs resulting from deregulation. The proposed feasibility study is defined. The intent is to provide General Refractories with the basis upon which to determine the feasibility of incorporating such a facility in Florence. To perform the work, a Grant for which was awarded by the DOE, General Refractories selected Dravo Engineers and Contractors based upon their qualifications in the field of coal conversion, and the fact that Dravo has acquired the rights to the Wellman-Galusha technology. The LBG prices for the five-gasifier case are encouraging. Given the various natural gas forecasts available, there seems to be a reasonable possibility that the five-gasifier LBG prices will break even with natural gas prices somewhere between 1984 and 1989. General Refractories recognizes that there are many uncertainties in developing these natural gas forecasts, and if the present natural gas decontrol plan is not fully implemented some financial risks occur in undertaking the proposed gasification facility. Because of this, General Refractories has decided to wait for more substantiating evidence that natural gas prices will rise as is now being predicted.

  16. 48. MAP OF SANTA ANA RIVER POWER PLANT NO. 2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. MAP OF SANTA ANA RIVER POWER PLANT NO. 2 OF THE EDISON ELECTRIC CO. THROUGH UNSURVEYED LAND IN THE SAN BERNARDINO FOREST RESERVE, APPROVED MAY 26, 1904, F. C. FINKLE, CHIEF HYDRAULIC ENGINEER. SCE drawing no. 53988. - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  17. Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison

    SciTech Connect

    Kelley, Nathan; Corsaro, Pietro

    2004-12-01

    Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

  18. Fluesorbent FGD at the Burger and Lausche plants

    SciTech Connect

    Nelson, S. Jr.

    1998-04-01

    While large, capital-intensive coal-fired power plants have a number of waste-free flue gas desulfurization options available, few economical choices exist for operators of more moderately-sized industrial and institutional boilers. The Fluesorbent technology, a simple duct-injection process designed for waste-free operation and low capital costs, was designed to fill this gap. Its unique feature is the use of expanded vermiculite or perlite with the injected lime. This enables 85% SO{sub 2} removal at reasonable lime consumption rates and results in a valuable agricultural by-product, instead of a waste. A 6,500-acfm Fluesorbent pilot plant was recently tested at Ohio Edison`s Burger station with promising results. Plans are currently underway for the first permanent Fluesorbent installation on two coal-fired boilers at Ohio University`s Lausche heating plant. This paper describes the Burger plant results and the Lausche plant plans.

  19. 77 FR 63302 - San Gabriel Valley Water Company dba, Fontana Water Company; Notice of Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Energy Regulatory Commission San Gabriel Valley Water Company dba, Fontana Water Company; Notice of.... d. Applicant: San Gabriel Valley Water Company dba, Fontana Water Company. e. Name of Project: Sandhill Water Treatment Plant In-Conduit Hydroelectric Project. f. Location: The proposed Sandhill...

  20. High temperature fracturing and ductile deformation during cooling of a pluton: The Lake Edison granodiorite (Sierra Nevada batholith, California)

    NASA Astrophysics Data System (ADS)

    Pennacchioni, Giorgio; Zucchi, Eleonora

    2013-05-01

    In the Bear Creek area of the Sierra Nevada batholith, California, the high temperature postmagmatic deformation structures of the Lake Edison granodiorite include steeply-dipping orthogneiss foliations, joints, and ductile shear zones that nucleated on joints and leucocratic dykes. Exploitation of segmented joints resulted in sharply bounded, thin shear zones and in large slip gradients near the shear zone tips causing the deformation of the host rock at contractional domains. The orthogneiss foliation intensifies towards the contact with the younger Mono Creek granite and locally defines the dextral Rosy Finch Shear Zone (RFSZ), a major kilometre-wide zone crosscutting the pluton contacts. Joints predominantly strike at N70-90°E over most of the Lake Edison pluton and are exploited as sinistral shear zones, both within and outside the RFSZ. In a narrow (˜250 m thick) zone at the contact with the younger Mono Creek granite, within the RFSZ, the Lake Edison granodiorite includes different sets of dextral and sinistral shear zones/joints (the latter corresponding to the set that dominates over the rest of the Lake Edison pluton). These shear zones/joints potentially fit with a composite Y-R-R' shear fracture pattern associated with the RFSZ, or with a pattern consisting of Y-R-shear fractures and rotated T' mode I extensional fractures. The mineral assemblage of shear zones, and the microstructure and texture of quartz mylonites indicate that ductile deformation occurred above 500 °C. Joints and ductile shearing alternated and developed coevally. The existing kinematic models do not fully capture the structural complexity of the area or the spatial distribution of the deformation and magmatic structures. Future models should account more completely for the character of ductile and brittle deformation as these plutons were emplaced and cooled.

  1. Distributed Energy Alternative to Electrical Distribution Grid Expansion in Consolidated Edison Service Territory

    SciTech Connect

    Kingston, Tim; Kelly, John

    2008-08-01

    The nation's power grid, specifically the New York region, faces burgeoning energy demand and suffers from congested corridors and aging equipment that cost New York consumers millions of dollars. Compounding the problem is high-density buildup in urban areas that limits available space to expand grid capacity. Coincidently, these urban areas are precisely where additional power is required. DER in this study refers to combined heat and power (CHP) technology, which simultaneously generates heat and electricity at or near the point where the energy will be consumed. There are multiple CHP options available that, combined with a portfolio of other building energy efficiency (EE) strategies, can help achieve a more efficient supply-demand balance than what the grid can currently provide. As an alternative to expanding grid capacity, CHP and EE strategies can be deployed in a flexible manner at virtually any point on the grid to relieve load. What's more, utilities and customers can install them in a variety of potentially profitable applications that are more environmentally friendly. Under the auspices of the New York State Energy Research and Development Authority (NYSERDA) and the Oak Ridge National Laboratory representing the Office of Electricity of the U.S. Department of Energy, Gas Technology Institute (GTI) conducted this study in cooperation with Consolidated Edison to help broaden the market penetration of EE and DER. This study provides realistic load models and identifies the impacts that EE and DER can have on the electrical distribution grid; specifically within the current economic and regulatory environment of a high load growth area of New York City called Hudson Yards in Midtown Manhattan. These models can be used to guide new policies that improve market penetration of appropriate CHP and EE technologies in new buildings. The following load modeling scenarios were investigated: (1) Baseline: All buildings are built per the Energy Conservation

  2. 76 FR 77022 - In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... the Federal Register on August 31, 2011 (76 FR 54261). No comments or hearing requests were received... Control of Licenses I. Carolina Power & Light Company (CP&L, the licensee) is the owner of the H.B... and materials license authorize CP&L to possess, use, and operate the Robinson facility. II....

  3. In-depth survey report of silica flour dust during packing, transfer, and shipping at the Central Silica Company, Glass Rock Plant, Glass Rock, Ohio

    SciTech Connect

    Caplan, P.E.; Reed, L.D.; Amendola, A.A.; Cooper, T.C.

    1981-12-01

    A visit was made to the Central Silica Company, Glass Rock, Ohio to evaluate methods used to control employee exposure to silica dust. The control methods at this company included careful handling and transfer of damp materials, exhaust ventilation, good housekeeping procedures, and the use of respiratory protection. Evaluations were made of the packing area, transfer point, inside loading trucks, and ambient air at sections of the flour building. Control systems included a good exhaust-ventilation system and four ventilation hoods. Evaluations were made of samples collected by an MSA gravimeter dust sampler, the Del High volume electrostatic precipitation, and bulk and rafter samples. Dust control methods appeared to be effective due to the existence of good engineering controls, good work practices, and an effective respiratory protection program. Additional control measures included the handling of the ore as a damp material, thus reducing the generation of dust particles. Outside dust sources were being reduced. Most of the product was shipped in bulk. Plastic wrapping was used around pallet loads to reduce bag breakage and dust dispersion. A filtered air system controlled low dust levels in the Pebble Mill control room. Enclosed screens operated under negative pressure separated fine from coarse product at the process building.

  4. Health hazard evaluation determination report No. MHETA-80-119-9007, Peabody Coal Company, Ken Surface Mine Processing Plant, Beaver Dam, Kentucky

    SciTech Connect

    Hewett, P.

    1980-11-01

    Possible adverse health effects caused by welding in coal washboxes at the Peabody Coal Company (SIC-1211) near Beaver Dam, Kentucky, were evaluated. The request was made by the United Mine Workers of America following an incident involving a worker suffering a stroke after welding in a coal washbox. The industrial hygiene survey was conducted on January 24, 1982. A total of eight welders were potentially exposed in the coal washboxes. Exposure to total welding fume, iron-oxide (1309371) fume, manganese (7439965) fume, fluorides, ozone (10028156), carbon-monoxide (630080), and nitrogen-dioxide (10102440) were monitored. The American Conference of Governmental Industrial Hygienists (ACGIH) exposure limits for these substances are 5 milligrams per cubic meter (mg/m3), 5mg/m3, 1mg/m3, 2.5mg/m3, 0.1 parts per million (ppm), 50ppm, and 3ppm, respectively. All exposures were less than the ACGIH limits or the NIOSH recommended health standard. The authors conclude that the work practices and ventilation control measures are effective in controlling welder exposure to welding fumes and gases. It is suggested that these procedures continue as company policy when welding maintenance is required inside the washboxes.

  5. 115. JOB NO. 1347K, SHEET 3M, 1929/1930, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    115. JOB NO. 1347-K, SHEET 3M, 1929/1930, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; BOILER SETTING - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  6. 113. JOB NO. 1347K, SHEET 2M, 1929, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    113. JOB NO. 1347-K, SHEET 2M, 1929, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; SECTIONS - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  7. 114. JOB NO. 1347K, SHEET 1M, 1929, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    114. JOB NO. 1347-K, SHEET 1M, 1929, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; PLAN - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  8. A forward looking company

    SciTech Connect

    Christian, David A.

    2004-06-01

    The article is an excerpt of an interview with David A. Christian, Senior Vice President-Nuclear and Chief Nuclear Officer, Dominion Generation conducted at NEI's Nuclear Energy Assembly in New Orleans, Louisiana on 13 May 2004. It highlights the company's energy diversity, and in particular, activities related to early-site permits and possible future plans for nuclear power plant development in the U.S. The interview touches on questions related to the Consortium (composed of Dominion, AECL Technologies, the U.S. subsidiary of AECL, Hatachi America and Bechtel Power Corp.) and the DOE financial support involved (approximately 50%) along with comments related to job impacts, energy security and climate change impacts, human resource issues (particularly about getting high school students interested in jobs related to the nuclear industry) and public policy. The interview ends with a discussion of investment interest and the state of standardization in the industry.

  9. Energy Assessment Helps Kaiser Aluminum Save Energy and Improve Productivity; DOE Software Adopted as Standard for Analyzing Plant Process Heating Systems Company-Wide

    SciTech Connect

    Not Available

    2008-07-01

    This case study describes how the Kaiser Aluminum plant in Sherman, Texas, achieved annual savings of $360,000 and 45,000 MMBtu, and improved furnace energy intensity by 11.1% after receiving a DOE Save Energy Now energy assessment and implementing recommendations to improve the efficiency of its process heating system.

  10. Status and Progress of a Fault Current Limiting Hts Cable to BE Installed in the con EDISON Grid

    NASA Astrophysics Data System (ADS)

    Maguire, J.; Folts, D.; Yuan, J.; Henderson, N.; Lindsay, D.; Knoll, D.; Rey, C.; Duckworth, R.; Gouge, M.; Wolff, Z.; Kurtz, S.

    2010-04-01

    In the last decade, significant advances in the performance of second generation (2G) high temperature superconducting wire have made it suitable for commercially viable applications such as electric power cables and fault current limiters. Currently, the U.S. Department of Homeland Security is co-funding the design, development and demonstration of an inherently fault current limiting HTS cable under the Hydra project with American Superconductor and Consolidated Edison. The cable will be approximately 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The underground cable will be installed and energized in New York City. The project is led by American Superconductor teamed with Con Edison, Ultera (Southwire and nkt cables joint venture), and Air Liquide. This paper describes the general goals, design criteria, status and progress of the project. Fault current limiting has already been demonstrated in 3 m prototype cables, and test results on a 25 m three-phase cable will be presented. An overview of the concept of a fault current limiting cable and the system advantages of this unique type of cable will be described.

  11. Customer Impact Evaluation for the 2009 Southern California Edison Participating Load Pilot

    SciTech Connect

    Gifford, William; Bodmann, Shawn; Young, Paul; Eto, Joseph H.; Laundergan, Jeremy

    2010-05-28

    The 2009 Participating Load Pilot Customer Impact Evaluation provides evidence that short duration demand response events which cycle off air conditioners for less than thirty minutes in a hot, dry environment do not lead to a significant degradation in the comfort level of residents participating in the program. This was investigated using: (1) Analysis of interval temperature data collected from inside residences of select program participants; and (2) Direct and indirect customer feedback from surveys designed and implemented by Southern California Edison at the conclusion of the program season. There were 100 indoor temperature monitors that were acquired by LBNL for this study that transmitted temperature readings at least once per hour with corresponding timestamps during the program season, June-October, 2009. Recorded temperatures were transferred from the onsite telemetry devices to a mesh network, stored, and then delivered to KEMA for analysis. Following an extensive data quality review, temperature increases during each of the thirty demand response test events were calculated for each device. The results are as follows: (1) Even for tests taking place during outside temperatures in excess of 100 degrees Fahrenheit, over 85 percent of the devices measured less than a 0.5 degree Fahrenheit temperature increase indoors during the duration of the event. (2) For the increases that were observed, none was more than 5 degrees and it was extremely rare for increases to be more than 2 degrees. At the end of the testing season SCE and KEMA designed and conducted a survey of the a facilities and public works managers and approximately 100 customers feedback survey to assess the extent the PLP events were noticed or disrupted the comfort level of participants. While only a small sampling of 3 managers and 16 customer surveys were completed, their responses indicate: (1) No customer reported even a moderate level of discomfort from the cycling-off of their air

  12. Health hazard evaluation determination report number MHETA-82-006-9002, Sewell Coal Company, Number 1 Preparation Plant, Nettie, West Virginia, VA

    SciTech Connect

    Patil, A.; Corwell, R.J.

    1982-08-01

    The potential health effects of exposure to a coal antifreeze agent, Wendon-NF-40 were examined. The study was requested by the United Mine Workers of America and was conducted on March 8, 1982 at the Sewell Coal Company No. 1 Preparation Facility (SIC-1211), Nettie, West Virginia. The antifreeze agent was sprayed on the coal as it fell from a conveyer belt into a large hopper. The spraying operation was enclosed except at one side. The preliminary on site investigation was conducted after the facility had discontinued using the antifreeze agent. Therefore, only bulk samples were collected for qualitative analysis. Workers were interviewed by a NIOSH physician. The qualitative analysis revealed that the primary component of the antifreeze was diethylene-glycol (111466). Two of 10 workers interviewed complained of health problems they felt were related to exposure to Wendon-NF-40. Their symptoms included headache and skin irritation. Due to lack of environmental sampling, NIOSH was unable to determine that a hazard from overexposure to Wendon-NF-40 existed. The authors suggest that organic vapor respirators should be worn by workers when they are in area where inhalation of the mists or sprays is likely.

  13. Industrial hygiene walk-through survey report of E. I. Dupont de Nemours and Company, Inc. , Chocolate Bayou Plant, Alvin, Texas

    SciTech Connect

    Fajen, J.M.

    1985-05-01

    A walkthrough survey of EI duPont deNemours and Company, Incorporated, Alvin, Texas was conducted in November, 1984. The purpose of the survey was to obtain information on the 1,3-butadiene monomer manufacturing process and the potential for exposure. The facility manufactured a crude product stream containing 1,3-butadiene as a coproduct of its ethylene process. The crude was refined to a 99.5% 1,3-butadiene product. The refining process occurred in a closed system, tightly maintained for economic, fire, and health-hazard reasons. The product was transferred by way of a pipeline to storage spheres for later transport off site. The facility used an open-loop cylinder (bomb) technique for quality control sampling. All pumps were equipped with single mechanical seals, which were in the process of being replaced by tandem seals. Since 1962, the facility had experienced process changes and three changes of ownership. Because of these changes, records from previous owners of industrial hygiene monitoring were not available. Job titles identified as having potential exposure were processors, wage employee supervisors, production engineers, and laboratory technicians. The author concludes that a closed-loop manual quality-control sampling system should be installed to reduce exposure from this source.

  14. Alexander Graham Bell's Patent for the Telephone and Thomas Edison's Patent for the Electric Lamp. The Constitution Community: The Development of the Industrial United States (1870-1900).

    ERIC Educational Resources Information Center

    Schur, Joan Brodsky

    In 1876 Americans held a Centennial Exhibition in Philadelphia (Pennsylvania) to celebrate the nation's birth 100 years earlier. Machinery Hall drew the most admiration and wonder. Alexander Graham Bell exhibited the first telephone, and Thomas Alva Edison presented the automatic telegraph, one of more than 1,000 inventions he would patent in his…

  15. 77 FR 1667 - Nelson S. Galgoul, Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil 20531-070, Respondent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ..., the most recent being that of August 12, 2011 (76 FR 50,661 (Aug. 16, 2011)), has continued the... Bureau of Industry and Security Nelson S. Galgoul, Av. Edison Passess 909, Rio De Janeiro, R.J., Brazil... program from the United States to Iran via Brazil, without the required U.S. Government...

  16. Summary of Dissimilar Metal Joining Trials Conducted by Edison Welding Institute

    SciTech Connect

    MJ Lambert

    2005-11-18

    Under the direction of the NASA-Glenn Research Center, the Edison Welding Institute (EWI) in Columbus, OH performed a series of non-fusion joining experiments to determine the feasibility of joining refractory metals or refractory metal alloys to Ni-based superalloys. Results, as reported by EWI, can be found in the project report for EWI Project 48819GTH (Attachment A, at the end of this document), dated October 10, 2005. The three joining methods used in this investigation were inertia welding, magnetic pulse welding, and electro-spark deposition joining. Five materials were used in these experiments: Mo-47Re, T-111, Hastelloy X, Mar M-247 (coarse-grained, 0.5 mm to several millimeter average grain size), and Mar M-247 (fine-grained, approximately 50 {micro}m average grain size). Several iterative trials of each material combination with each joining method were performed to determine the best practice joining method. Mo-47Re was found to be joined easily to Hastelloy X via inertia welding, but inertia welding of the Mo-alloy to both Mar M-247 alloys resulted in inconsistent joint strength and large reaction layers between the two metals. T-111 was found to join well to Hastelloy X and coarse-grained Mar M-247 via inertia welding, but joining to fine-grained Mar M-247 resulted in low joint strength. Magnetic pulse welding (MPW) was only successful in joining T-111 tubing to Hastelloy X bar stock. The joint integrity and reaction layer between the metals were found to be acceptable. This single joining trial, however, caused damage to the electromagnetic concentrators used in this process. Subsequent design efforts to eliminate the problem resulted in a loss of power imparted to the accelerating work piece, and results could not be reproduced. Welding trials of Mar M-247 to T-111 resulted in catastrophic failure of the bar stock, even at lower power. Electro-spark deposition joining of Mo-47Re, in which the deposited material was Hastelloy X, did not have a

  17. Section 1: Company directory

    SciTech Connect

    Not Available

    1991-12-01

    This is a 1992 directory of those companies doing business in all areas of the independent power producers industry. The listing includes the company name, address, telephone and FAX numbers, and the name of a company contact. The listing is international in scope.

  18. 3. Credit PEM. Interior of Martinsburg plant showing two MacIntousch ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Credit PEM. Interior of Martinsburg plant showing two MacIntousch Seymore steam engines and one Taylor steam engine belt driving (from let to right) a sperry 30 light, 220 Volt generator, a Westinghouse 900 light, 2200 Volt generator, a Ball 80 light are generator, and two Edison, 900 light, 220 Volt generators. Note switchboard to left. Photo c. 1896. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV

  19. 76 FR 60818 - Draper Irrigation Company; Notice of Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Energy Regulatory Commission Draper Irrigation Company; Notice of Application Accepted for Filing and...: June 27, 2011, and supplemented on September 9, 2011. d. Applicant: Draper Irrigation Company. e. Name... located adjacent to Draper Irrigation Company's water treatment plant on the plant's raw...

  20. Neural networks for control of NO{sub x} emissions in fossil plants

    SciTech Connect

    Reifman, J.; Feldman, E.E.

    1997-04-01

    We discuss the use of two classes of artificial neural networks, multilayer feedforward networks and fully-recurrent networks, in the development of a closed-loop controller for discrete-time dynamical systems. We apply the neural system to the control of oxides of nitrogen (NO{sub x}) emissions for a simplified representation of a furnace of a coal-fired fossil plant. Plant data from one of Commonwealth Edison`s fossil power plants were used to build a recurrent neural model of NO{sub x} formation which is then used in the training of the feedforward neural controller. Preliminary simulation results demonstrate the feasibility of the approach and additional tests with increasingly realistic models should be pursued.

  1. 53. Photocopy of photograph, c. 1946. GENERAL INTERIOR VIEW OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. Photocopy of photograph, c. 1946. GENERAL INTERIOR VIEW OF GENERATOR ROOM. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  2. 60. Photocopy of photograph, no date. DETAIL OF SWITCHBOARD. (Courtesy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. Photocopy of photograph, no date. DETAIL OF SWITCHBOARD. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Properties-Buildings and Equipment listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  3. 61. Photocopy of photograph, c. 1949. DETAIL OF SWITCHBOARD WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. Photocopy of photograph, c. 1949. DETAIL OF SWITCHBOARD WITH MODIFICATIONS. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV

  4. 49. OVERALL VIEW OF COMMERCIAL/INDUSTRIAL DISTRICT SHOWING SWIFT AND COMPANY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. OVERALL VIEW OF COMMERCIAL/INDUSTRIAL DISTRICT SHOWING SWIFT AND COMPANY MEAT PROCESSING PLANT IN CENTER FOREGROUND AND FARLEY AND LOETSCHER MANUFACTURING COMPANY WAREHOUSE ANNEX IN CENTRAL BACKGROUND. VIEW TO NORTHEAST. - Dubuque Commercial & Industrial Buildings, Dubuque, Dubuque County, IA

  5. 107. JOB NO. 1347T, SHEET IS, 1930, FORD MOTOR COMPANY; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. JOB NO. 1347-T, SHEET IS, 1930, FORD MOTOR COMPANY; REINFORCEMENT OF GRAVITY TANK - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  6. Companies as Business Laboratories.

    ERIC Educational Resources Information Center

    Rebernik, Miroslav

    2002-01-01

    Describes a business education program whose underlying philosophy is that business education for students who will be employed by smaller companies which feature de-specialization of job tasks, resource poverty, and self-employment must be different from business education for larger companies. (EV)

  7. The mortality of companies.

    PubMed

    Daepp, Madeleine I G; Hamilton, Marcus J; West, Geoffrey B; Bettencourt, Luís M A

    2015-05-01

    The firm is a fundamental economic unit of contemporary human societies. Studies on the general quantitative and statistical character of firms have produced mixed results regarding their lifespans and mortality. We examine a comprehensive database of more than 25 000 publicly traded North American companies, from 1950 to 2009, to derive the statistics of firm lifespans. Based on detailed survival analysis, we show that the mortality of publicly traded companies manifests an approximately constant hazard rate over long periods of observation. This regularity indicates that mortality rates are independent of a company's age. We show that the typical half-life of a publicly traded company is about a decade, regardless of business sector. Our results shed new light on the dynamics of births and deaths of publicly traded companies and identify some of the necessary ingredients of a general theory of firms. PMID:25833247

  8. The mortality of companies

    PubMed Central

    Daepp, Madeleine I. G.; Hamilton, Marcus J.; West, Geoffrey B.; Bettencourt, Luís M. A.

    2015-01-01

    The firm is a fundamental economic unit of contemporary human societies. Studies on the general quantitative and statistical character of firms have produced mixed results regarding their lifespans and mortality. We examine a comprehensive database of more than 25 000 publicly traded North American companies, from 1950 to 2009, to derive the statistics of firm lifespans. Based on detailed survival analysis, we show that the mortality of publicly traded companies manifests an approximately constant hazard rate over long periods of observation. This regularity indicates that mortality rates are independent of a company's age. We show that the typical half-life of a publicly traded company is about a decade, regardless of business sector. Our results shed new light on the dynamics of births and deaths of publicly traded companies and identify some of the necessary ingredients of a general theory of firms. PMID:25833247

  9. Determining the Appropriate Package and Transportation Methodology for the Detroit Edison, Fermi II Msrs and Associated Components

    SciTech Connect

    Weber, B.

    2007-07-01

    During the spring of 2005, Detroit Edison, Enrico Fermi II Nuclear Power Station (Fermi) decided to disposition two MSRs and associated components scheduled for replacement in the spring of 2006 during the MSR Replacement Outage. Of concern to Fermi was the proper packaging and transportation methodology when dis-positioning a component measuring approximately 110' in length and 13' in diameter and weighing over 300 tons. Upon removal from the Turbine Deck the retired MSRs and associated components were turned over to the Rad Waste Group for packaging and final disposition. Fermi requested quotations from vendors to package, transport, and disposition the MSRs and associated components. However, multiple Vendors informed Fermi that the size and weight of the MSRs were questionable in passing permitting requirements and would require segmentation and volume reduction on site or at a waste processor. Fermi contracted with MHF Logistical Solutions (MHF-LS) based on their ability to receive clearances for shipping the MSRs in one piece via two heavy haul rail conveyances acting as a bolstered load with professionally engineered blocking and bracing configured to support the retired MSRs. (authors)

  10. 78 FR 11638 - Michigan Consolidated Gas Company, DTE Gas Company, DTE Gas Company; Notice of Petition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Energy Regulatory Commission Michigan Consolidated Gas Company, DTE Gas Company, DTE Gas Company; Notice... Docket Nos. PR13-29-000, and PR13-30-000 (not consolidated), Michigan Consolidated Gas Company (MichCon) and DTE Gas Company (DTE Gas) filed to institute a name change to both itself from MichCon to DTE...