  1. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2,...

  2. A History of the Atomic Energy Commission

    DOE R&D Accomplishments Database

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  3. Curriculum for Commissioning Energy Efficient Buildings

    SciTech Connect

    Webster, Lia

    2012-09-30

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  4. Commissioning

    SciTech Connect

    Huta, L.G.

    1995-12-01

    Building managers often find that HVAC, lighting and other systems in new buildings need adjustments and modifications. The owner, architect and contractor may mistakenly assume that all of a building`s systems--architectural, mechanical, control and electrical--function according to the design intent. Thus, energy managers can optimize their building`s performance through commissioning, a process that looks for and corrects the defects in a building` operating system or design, immediately before and after it is occupied (following construction or renovation).

  5. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    SciTech Connect

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  6. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    SciTech Connect

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  7. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    SciTech Connect

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  8. Instrumented home energy rating and commissioning

    SciTech Connect

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  9. Commissioning: A Highly Cost-Effective Building Energy Management Strategy

    SciTech Connect

    Mills, Evan

    2011-01-06

    Quality assurance and optimization are essential elements of any serious technological endeavor, including efforts to improve energy efficiency. Commissioning is an important tool in this respect. The aim of commissioning new buildings is to ensure that they deliver-if not exceed-the performance and energy savings promised by their design. When applied to existing buildings, one-time or repeated commissioning (often called retrocommissioning) identifies the almost inevitable drift in energy performance and puts the building back on course, often surpassing the original design intent. In both contexts, commissioning is a systematic, forensic approach to improving performance, rather than a discrete technology.

  10. Improving building energy system performance by continuous commissioning

    SciTech Connect

    Liu, M.

    1999-10-01

    Commissioning has played an important role in improved building comfort and reduced energy consumption. This article presents an advanced form of commissioning for existing buildings, called continuous commissioning (CC), which has produced energy savings comparable to those produced by the traditional audit/retrofit process at a third of the cost. It has also increased operating staff skills, reduced maintenance costs, and improved building comfort--extras which are not provided by usual retrofit programs. This article will present the philosophy, process, cost, and savings. Continuous commissioning is a process developed by the Energy Systems Laboratory (ESL) to: (1) optimize the operation of existing systems to improve building comfort and reduce building energy cost; (2) solve existing comfort and IAQ problems; (3) guarantee continuous optimal operation by operational staff in future years; and (4) provide optimal energy retrofit suggestions to owners to minimize the project costs.

  11. Audit of the Federal Energy Regulatory Commission leased warehouse space

    SciTech Connect

    1996-05-24

    The Federal Energy Regulatory Commission (Commission) stores furniture, automated data processing equipment, and office supplies in a warehouse located in Landover, Maryland. The annual operating cost for this space (25,830 square feet) approximates $455,000-$245,000 in lease costs and $210,000 for contractor personnel. The purpose of the audit was to assess the effectiveness of the Commission`s use of warehouse space. The specific audit objective was to determine whether the Commission was minimizing the need for warehouse space for the storage of office supplies, furniture, and equipment. Federal Property Management Regulations and prudent business practices require Government agencies to minimize their need for space. More space was being leased than needed because Commission officials understood that they were obligated by terms of the lease to -pay for the space until March 31, 2002. We found, however, that there was a misunderstanding by officials, and that the Commission could at any time relinquish warehouse space by giving 120 days notice. Because of this misunderstanding and the recent relocation of the Commission to a newly furnished facility, about 16,000 square feet of warehouse space was being used to store furniture and equipment that was no longer needed by the Commission. An additional 6,000 square feet of space was used to store office supplies instead of using a more frequent ordering program that would reduce space requirements.

  12. 76 FR 62055 - Mississippi Delta Energy Agency, Clarksdale Public Utilities Commission, Public Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mississippi Delta Energy Agency, Clarksdale Public Utilities Commission... Practice and Procedures, and the applicable Tariff on file with the Commission, Mississippi Delta...

  13. 77 FR 16828 - Constellation Energy Commodities Group, Inc.; Notice of Designation of Certain Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Constellation Energy Commodities Group, Inc.; Notice of Designation of Certain Commission Personnel as Non-Decisional Commission staff members Sandra Waldstein and...

  14. Combined Film Catalog, 1972, United States Atomic Energy Commission.

    ERIC Educational Resources Information Center

    Atomic Energy Commission, Washington, DC.

    A comprehensive listing of all current United States Atomic Energy Commission (USAEC) films, this catalog describes 232 films in two major film collections. Part One: Education-Information contains 17 subject categories and two series and describes 134 films with indicated understanding levels on each film for use by schools. The categories…

  15. Division D Commission 44: Space and High-Energy Astrophysics

    NASA Astrophysics Data System (ADS)

    Jones, Christine; Brosch, Noah; Hasinger, Günther; Baring, Matthew G.; Barstow, Martin Adrian; Braga, Joao; Churazov, Evgenij M.; Eilik, Jean; Kunieda, Hideyo; Murthy, Jayant; Pagano, Isabella; Quintana, Hernan; Salvati, Marco; Singh, Kulinder Pal; Worrall, Diana Mary

    2016-04-01

    Division XI, the predecessor to Division D until 2012, was formed in 1994 at the IAU General Assembly in The Hague by merging Commission 44 Astronomy from Space and Commission 48 High Energy Astrophysics. Historically, space astrophysics started with the high energy wavelengths (far UV, X-ray, and gamma-ray astronomy) which are only accessible from space. However, in modern astronomy, to study high energy astrophysical processes, almost all wavelengths are used (including gamma-ray, X-ray, UV, optical, infrared, submillimeter and radio). In addition other ground-based facilities, including gravitational wave antennas, neutrino detectors and high-energy cosmic ray arrays are joining in this era of multi-messenger astrophysics, as well as space missions with the primary goals to discover and study exoplanets, are under the umbrella of Division XI.

  16. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    SciTech Connect

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  17. 77 FR 34379 - Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold a...

  18. Impacts of Modeled Recommendations of the National Commission on Energy Policy

    EIA Publications

    2005-01-01

    This report provides the Energy Information Administration's analysis of those National Commission on Energy Policy (NCEP) energy policy recommendations that could be simulated using the National Energy Modeling System (NEMS).

  19. French Atomic Energy Commission Decommissioning Programme and Feedback Experience - 12230

    SciTech Connect

    Guiberteau, Ph.; Nokhamzon, J.G.

    2012-07-01

    Since the French Atomic and Alternatives Energy Commission (CEA) was founded in 1945 to carry out research programmes on use of nuclear, and its application France has set up and run various types of installations: research or prototypes reactors, process study or examination laboratories, pilot installations, accelerators, nuclear power plants and processing facilities. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R and D facilities in line with the issues of the nuclear industry of the future. Since the 1960's and 1970's in all its centres, the CEA has acquired experience and know-how through dismantling various nuclear facilities. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing now from two dedicated funds, close to euro 15,000 M for the next thirty years, for current or projected dismantling operations, the CEA's Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2016, the dismantling of the UP1 plant at Marcoule, the largest dismantling work in France, will be well advanced, with all the process equipment dismantled. After an overview of the French regulatory framework, the paper will describe the DD and R (Decontamination Decommissioning and Remediation) strategy, programme and feedback experience inside the CEA's Nuclear Energy Division. A special feature of dismantling operations at the CEA

  20. Report to the Legislature on the California Energy Commission's Geothermal Development Grant Program for Local Governments

    SciTech Connect

    Not Available

    1983-04-01

    This report documents the California Energy Commission's administration of its Geothermal Development Grant Program for Local Governments. The Energy Commission established this program as a result of the passage of Assembly Bill 1905 (Bosco) in 1980. This legislation established the mechanism to distribute the state's share of revenues received from the leasing of federal mineral reserves for geothermal development. The federal government deposits these revenues in the Geothermal Resources Development Account (GRDA) created by AB 1905. The state allocates funds from the GRDA to the California Parklands and Renewable Resources Investment Fund, the counties of origin where the federal leases are located, and the Energy Commission. The legislation further directs the Energy Commission to disburse its share as grants to local governments to assist with the planning and development of geothermal resources. Activities which are eligible for funding under the Energy Commission's grant program include resource development projects, planning and feasibility studies, and activities to mitigate the impacts of existing geothermal development.

  1. Energy and Cost Savings of Retro-Commissioning and Retrofit Measures for Large Office Buildings

    SciTech Connect

    Wang, Weimin; Zhang, Jian; Moser, Dave; Liu, Guopeng; Athalye, Rahul A.; Liu, Bing

    2012-08-03

    This paper evaluates the energy and cost savings of seven retro-commissioning measures and 29 retrofit measures applicable to most large office buildings. The baseline model is for a hypothetical building with characteristics of large office buildings constructed before 1980. Each retro-commissioning measure is evaluated against the original baseline in terms of its potential of energy and cost savings while each retrofit measure is evaluated against the commissioned building. All measures are evaluated in five locations (Miami, Las Vegas, Seattle, Chicago and Duluth) to understand the impact of weather conditions on energy and cost savings. The results show that implementation of the seven operation and maintenance measures as part of a retro-commissioning process can yield an average of about 22% of energy use reduction and 14% of energy cost reduction. Widening zone temperature deadband, lowering VAV terminal minimum air flow set points and lighting upgrades are effective retrofit measures to be considered.

  2. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2010-01-01 2010-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  3. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2013-01-01 2013-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  4. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2011-01-01 2011-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  5. 10 CFR 1040.124 - Responsibility of the Federal Energy Regulatory Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... be placed in title 18 CFR. Judicial Review ... 10 Energy 4 2014-01-01 2014-01-01 false Responsibility of the Federal Energy Regulatory Commission. 1040.124 Section 1040.124 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION...

  6. Costs and benefits from utility-funded commissioning of energy- efficiency measures in 16 buildings

    SciTech Connect

    Piette, M.A.; Nordman, B.

    1995-10-01

    This paper describes the costs and savings of commissioning of energy- efficiency measures in 16 buildings. A total of 46 EEMs were commissioned for all 16 buildings and 73 deficiencies were corrected. On average, commissioning was marginally cost effective on energy savings alone, although the results were mixed among all 16 buildings. When considered as a stand-alone measure, the median simple payback time of 6.5 years under the low energy prices in the Pacific Northwest. Under national average prices the median payback time is about three years. In estimating the present value of the energy savings from commissioning we considered low and high lifetimes for the persistence of savings from deficiency corrections. Under the low- lifetime case the average present value of the energy savings ($0. 21/ft{sup 2}) were about equal to the average commissioning costs ($0. 23/ft{sup 2}). Under the high-lifetime case the savings ($0.51/ft{sup 2}) were about twice the costs. Again, the savings would be about twice as large under national average prices. The results are subject to significant uncertainty because of the small sample size and lack of metered data in the evaluation. However, the findings suggest that investments in commissioning pay off. Building owners want buildings that work as intended, and are comfortable, healthy, and efficient. It is likely that the non-energy benefits, which are difficult to quantify, are larger than the energy-savings benefits.

  7. 11. Architectural ELevations & Sections, 233S, U.S. Atomic Energy Commission, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Architectural ELevations & Sections, 233-S, U.S. Atomic Energy Commission, Hanford Atomic Products Operations, General Electric Company, Dwg. No. H-2-30465, 1956. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  8. 12. Architectural Floor Plans, 233S, U.S. Atomic Energy Commission, Hanford ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Architectural Floor Plans, 233-S, U.S. Atomic Energy Commission, Hanford Atomic Products Operations, General Electric Company, Dwg. H-2-30464, 1956. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  9. 13. Elevations, 233S, U.S. Atomic Energy Commission, Hanford Works, General ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Elevations, 233-S, U.S. Atomic Energy Commission, Hanford Works, General Electric Company, Dwg. No. H-2-7203, 1956. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  10. 11. Building Layout, 185189 D, U.S. Atomic Energy Commission, Richland ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Building Layout, 185-189 D, U.S. Atomic Energy Commission, Richland Operations Office, Dwg. No. H-1-14844, 1957. - D-Reactor Complex, Deaeration Plant-Refrigeration Buildings, Area 100-D, Richland, Benton County, WA

  11. 12. General Arrangement Plan, Building 189D, U.S. Atomic Energy Commission, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. General Arrangement Plan, Building 189-D, U.S. Atomic Energy Commission, General Electric Company, Dwg. No. H-1-11068, 1958. - D-Reactor Complex, Deaeration Plant-Refrigeration Buildings, Area 100-D, Richland, Benton County, WA

  12. European Union energy policy integration: A case of European Commission policy entrepreneurship and increasing supranationalism

    PubMed Central

    Maltby, Tomas

    2013-01-01

    Focusing on gas, this article explores the role of the European Commission in the process of European Union energy security policy development, and the extent to which the policy area is becoming increasingly supranational. Situating the article within the literature on agenda-setting and framing, it is argued that a policy window was opened as a result of: enlargement to include more energy import dependent states, a trend of increasing energy imports and prices, and gas supply disruptions. From the mid-2000s, the Commission contributed to a shift in political norms, successfully framing import dependency as a problem requiring an EU-level solution, based on the institution’s pre-existing preferences for a diversified energy supply and internal energy market. Whilst Member States retain significant sovereignty, the Commission has achieved since 2006 creeping competencies in the internal, and to a lesser extent external, dimensions of EU energy policy. PMID:24926115

  13. European Union energy policy integration: A case of European Commission policy entrepreneurship and increasing supranationalism.

    PubMed

    Maltby, Tomas

    2013-04-01

    Focusing on gas, this article explores the role of the European Commission in the process of European Union energy security policy development, and the extent to which the policy area is becoming increasingly supranational. Situating the article within the literature on agenda-setting and framing, it is argued that a policy window was opened as a result of: enlargement to include more energy import dependent states, a trend of increasing energy imports and prices, and gas supply disruptions. From the mid-2000s, the Commission contributed to a shift in political norms, successfully framing import dependency as a problem requiring an EU-level solution, based on the institution's pre-existing preferences for a diversified energy supply and internal energy market. Whilst Member States retain significant sovereignty, the Commission has achieved since 2006 creeping competencies in the internal, and to a lesser extent external, dimensions of EU energy policy. PMID:24926115

  14. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Commission Form L-3 (Revised October 1975) B Appendix B to Part 221 Navigation and Navigable Waters CORPS OF... 221—Federal Energy Regulatory Commission Form L-3 (Revised October 1975) terms and conditions of... set forth herein. Federal Energy Regulatory Commission Form L-4 (Revised October, 1975) terms...

  15. Federal Energy Regulatory Commission financial statements, September 30, 1995 and 1994

    SciTech Connect

    1996-02-12

    The attached report presents the results of the independent certified public accountant`s audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1995 and 1994. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on FERC`s internal control structure and on compliance with laws and regulations, and management letter are also provided.

  16. Commissioning of energy-efficiency measures: Costs and benefits for 16 buildings

    SciTech Connect

    Piette, M.A.; Nordman, B.; Greenberg, S.

    1995-04-01

    Building systems and energy-efficiency measures (EEMs) often don`t perform as well in practice as expected at the design stage. This fact has become clear to many organizations concerned with ensuring building performance. What to do about these problems is less clear. Several electric utilities around the U.S. have begun to take action to address the start-up, control, and operational problems that are found in nearly every building. One of the most beneficial periods to intervene in the building life cycle is during the start-up phase of a now building. Building commissioning during start up is such an intervention. Commissioning can be defined as: a set of procedures, responsibilities, and methods to advance a system from static installation to full working order in accordance with design intent. In broad terms, commissioning can extend from design reviews through operations and maintenance planning and training. With such a broad scope aimed at the entire building life cycle, commissioning is often likened to {open_quotes}Total Quality Management{close_quotes} Yet the heart of commissioning are the procedures developed and executed to ensure that all building systems function as intended. The incorporation of energy-efficiency criteria into building commissioning is a new development.

  17. Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

    SciTech Connect

    Cohon, Jared L.; Glauthier, T. J.; Augustine, Norman R.; Austin, Wanda M.; Elachi, Charles; Fleury, Paul A.; Hockfield, Susan J.; Meserve, Richard A.; Murray, Cherry A.

    2015-02-27

    The Commission to Review the Effectiveness of the National Energy Laboratories was charged by Congress in January 2014 to evaluate the mission, capabilities, size, performance, governance, and agency oversight of the 17 Department of Energy (DOE) laboratories. Given the incredibly broad scope and aggressive timeline (the original deadline was February 2015), the Secretary of Energy and Congress agreed to split the task into two phases. This interim report contains the preliminary observations and recommendations gleaned from Phase 1 of the study, which consisted of a literature review; visits to five of the National Laboratories; semi-structured interviews with staff from across the National Laboratories, DOE, other Federal agencies, companies, other non-governmental organizations, and additional interested parties; and presentations at monthly public Commission meetings. The Commission notes that the purpose of the National Laboratories is to provide critical capabilities and facilities in service of DOE’s mission and the needs of the broader national and international science and technology (S&T) community, including other Federal agencies, academia, and private industry. The National Laboratories are successfully fulfilling that mission today. While the Commission believes significant improvements can be made to many aspects of DOE management and governance of the laboratories, those issues do not detract from the National Laboratories’ remarkable contributions to the American public. In Phase 2 the Commission will focus on ways to make the process of carrying out their missions more efficient and effective.

  18. Geothermal research and development program of the US Atomic Energy Commission

    NASA Technical Reports Server (NTRS)

    Werner, L. B.

    1974-01-01

    Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

  19. 75 FR 1362 - Medical Area Total Energy Plant, Inc., New MATEP Inc.; Notice of Application for Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Medical Area Total Energy Plant, Inc., New MATEP Inc.; Notice of Application for Commission Certification of Qualifying Status of a Cogeneration Facility January 4, 2010. Take notice that on December 29, 2009,...

  20. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 8 which covers March thru June 1964.

  1. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 23 which covers September thru December 1970.

  2. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 4 which covers July 1962 thru December 1962.

  3. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 11 which covers July thru December 1965.

  4. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 9 which covers July thru December 1964.

  5. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include an historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Vol. 3 which covers the first 6 months of 1962.

  6. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 6 which covers July--November 1963.

  7. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    In include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 18 which covers January thru April 1969.

  8. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of selected number of subject areas over the ten-year period. This is Volume 13 which covers July thru December 1966.

  9. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 16 which covers January thru June 1968.

  10. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 14 which covers January thru June 1967.

  11. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include an historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subjects areas over the ten-year period. This is Volume 5 which covers the first 6 months of 1965.

  12. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of selected number of subject areas over the ten-year period. This is Volume 7 which covers November 1963 thru February 1964.

  13. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 15 which covers July thru December 1967.

  14. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 22 which covers May thru August 1970.

  15. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 12 which covers January thru June 1966.

  16. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 17 which covers July 1968 thru January 1969.

  17. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 20 which covers September thru December 1969.

  18. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 25 which covers May thru November 1971.

  19. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 19 which covers May thru August 1969.

  20. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 24 which covers January thru April 1971.

  1. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 10 which covers January thru June 1965.

  2. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    I include a historical summary of the major accomplishments of the Atomic Energy Commission during the period of my chairmanship. This is done in a topical manner, i.e., by describing in summary form the accomplishments in each of a selected number of subject areas over the ten-year period. This is Volume 21 which covers January thru April 1970.

  3. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    SciTech Connect

    Mills, Evan

    2009-07-16

    The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are

  4. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1989-12-01

    This book contains a very limited sampling of press clippings from my tenure as Chaiman of the Atomic Energy Commission (1961--1971). A more complete collection of these has been deposited with the Manuscript Division of the Library of Congress. This serves as an appendix to the Journal of Glenn T. Seaborg, Chairman of the Atomic Energy Commission, 1961--1971, which has been printed by the Lawrence Berkeley Laboratory in 25 volumes. Copies of this 25-volume daily journal have been deposited at the Lawrence Berkeley Laboratory, the Bancroft Library of the University of California at Berkeley, the University of California at Los Angeles Main Library, the University of California at Santa Barbara, the National Archives, the Library of Congress, and the presidential libraries of Kennedy, Johnson and Nixon.

  5. Training and Certification Program for Certified Energy Auditors (CEA) and Certified Building Commissioning Professionals (CBCP)

    SciTech Connect

    Kent, Bill

    2012-08-24

    The Association of Energy Engineers (AEE) has offered energy efficiency training and certification programs for over 30 years. During that time AEE has certified more than 22,000 professionals. All of our certification programs are the result of extensive industry research and program development and oversight by certification boards. For this project award, AEE proposed to work with the Department of Energy to utilize and extend existing industry recognized Certified Energy Auditor (CEA) and Certified Building Commissioning Professional (CBCP) programs under this Training Program Development Announcement. These expanded training programs will have significant impact in training professionals for building commissioning and energy auditing to achieve the goal of bringing existing buildings up to their optimal energy performance potential and ensuring that new buildings maintain their expected optimal level of performance. The goals and objectives of the training development project were achieved with the development of new training programs that are now being offered as self-sustaining commercial training and certification programs. These new programs are training and certifying professionals who are accomplishing the goal of increasing building energy performance in both existing and new buildings.

  6. U.S. Radioecology Research Programs of the Atomic Energy Commission in the 1950s

    SciTech Connect

    Reichle, D.E.

    2004-01-12

    This report contains two companion papers about radiological and environmental research that developed out of efforts of the Atomic Energy Commission in the late 1940s and the 1950s. Both papers were written for the Joint U.S.-Russian International Symposium entitled ''History of Atomic Energy Projects in the 1950s--Sociopolitical, Environmental, and Engineering Lessons Learned,'' which was hosted by the International Institute for Applied Systems Analysis in Laxemberg, Austria, in October 1999. Because the proceedings of this symposium were not published, these valuable historic reviews and their references are being documented as a single ORNL report. The first paper, ''U.S. Radioecology Research Programs Initiated in the 1950s,'' written by David Reichle and Stanley Auerbach, deals with the formation of the early radioecological research programs at the U.S. Atomic Energy Commission's nuclear production facilities at the Clinton Engineering Works in Oak Ridge, Tennessee; at the Hanford Plant in Richland, Washington; and at the Savannah River Plant in Georgia. These early radioecology programs were outgrowths of the environmental monitoring programs at each site and eventually developed into the world renowned National Laboratory environmental program sponsored by the Office of Biological and Environmental Research of the U.S. Department of Energy. The original version of the first paper was presented by David Reichle at the symposium. The second paper, ''U.S. Atomic Energy Commission's Environmental Research Programs Established in the 1950s,'' summarizes all the environmental research programs supported by the U.S. Atomic Energy Commission in the 1950s and discusses their present-day legacies. This paper is a modified, expanded version of a paper that was published in September 1997 in a volume commemorating the 50th anniversary symposium of the U.S. Department of Energy's Office of Biological and Environmental Research (DOE/BER). Contributors to the original

  7. Building thermography as a tool in energy audits and building commissioning procedure

    NASA Astrophysics Data System (ADS)

    Kauppinen, Timo

    2007-04-01

    A Building Commissioning-project (ToVa) was launched in Finland in the year 2003. A comprehensive commissioning procedure, including the building process and operation stage was developed in the project. This procedure will confirm the precise documentation of client's goals, definition of planning goals and the performance of the building. It is rather usual, that within 1-2 years after introduction the users complain about the defects or performance malfunctions of the building. Thermography is one important manual tool in verifying the thermal performance of the building envelope. In this paper the results of one pilot building (a school) will be presented. In surveying the condition and energy efficiency of buildings, various auxiliary means are needed. We can compare the consumption data of the target building with other, same type of buildings by benchmarking. Energy audit helps to localize and determine the energy saving potential. The most general and also most effective auxiliary means in monitoring the thermal performance of building envelopes is an infrared camera. In this presentation some examples of the use of thermography in energy audits are presented.

  8. Blue Ribbon Commission on America's Nuclear Future: Report to the Secretary of Energy

    SciTech Connect

    2012-01-01

    Preamble The Blue Ribbon Commission on America’s Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners are Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, Ms. Susan Eisenhower, Sen. Chuck Hagel, Mr. Jonathan Lash, Dr. Allison M. Macfarlane, Dr. Richard A. Meserve, Dr. Ernest J. Moniz, Dr. Per Peterson, Mr. John Rowe, and Rep. Phil Sharp. The Commission and its subcommittees met more than two dozen times between March 2010 and January 2012 to hear testimony from experts and stakeholders, to visit nuclear waste management facilities in the United States and abroad, and to discuss the issues identified in its Charter. Additionally, in September and October 2011, the Commission held five public meetings, in different regions of the country, to hear feedback on its draft report. A wide variety of organizations, interest groups, and individuals provided input to the Commission at these meetings and through the submission of written materials. Copies of all of these submissions, along with records and transcripts of past meetings, are available at the BRC website (www.brc.gov). This report highlights the Commission’s findings and conclusions and presents recommendations for consideration by the Administration and Congress, as well as interested state, tribal and local governments, other stakeholders, and the public.

  9. Report on the establishment and operation of the Federal Energy Regulatory Commission's Daycare Center

    SciTech Connect

    Not Available

    1991-09-16

    We have completed an inspection of the Federal Energy Regulatory Commission's (FERC) Daycare Center (Center). The purpose of the inspection was to review for efficiency, economy and compliance with laws and regulations, FERC's establishment and operation of the Center. The inspection objectives were to review: (1) FERC's compliance with Federal laws and requirements of the General Services Administration and the District of Columbia; (2) the source and amount of funds for establishing and operating the Center; and (3) the organizational relationships between FERC, the Center and the contractor operating the Center.

  10. Energy savings from indirect evaporative pre-cooling: Control strategies and commissioning

    SciTech Connect

    Felts, D.; Jump, D.A.

    1998-07-01

    Package rooftop air conditioning units (RTU) with evaporative pre-cooling systems were installed at an Agricultural History Museum and conference center in the northern Sacramento Valley in California, a hot and dry summer climate region. The evaporative pre-coolers serve to extend the economizer range of the RTU's. A commissioning team monitored the performance of the RTU evaporative pre-coolers. The purpose of the monitoring was to determine if changes were warranted to optimize the system's energy efficiency. The commissioning process revealed that the RTU evaporative pre-coolers were being controlled by the economizer control cycle. With this control cycle, the evaporative pre-cooler operates when the outdoor air temperature is falling below the space return air temperature. This means that the pre-cooler will never operate at peak load conditions. The conference center is an assembly occupancy. Building codes require significant levels of outdoor air for ventilation. The evaporative pre-cooler system provides the means to significantly offset the energy requirements for cooling down and heating up this ventilation air. A DOE2 energy simulation analysis indicated that the evaporative pre-cooler could cut energy use by over 50% if it were working correctly. Investigation concludes that in buildings with high outdoor air requirements, evaporative pre-cooling, using building exhaust air as the indirect evaporative cooling source, significantly reduce building energy consumption. This evaporative pre-cooling technology works in any climate, regardless of outdoor conditions, since the return air stream exhausted from the building provides a relatively constant temperature and humidity source for evaporative cooling. An added benefit is that the evaporative pre-cooler heat exchanger recovers heat from the exhausted air stream in cold weather.

  11. Improved Coefficient Calculator for the California Energy Commission 6 Parameter Photovoltaic Module Model

    SciTech Connect

    Dobos, A. P.

    2012-05-01

    This paper describes an improved algorithm for calculating the six parameters required by the California Energy Commission (CEC) photovoltaic (PV) Calculator module model. Rebate applications in California require results from the CEC PV model, and thus depend on an up-to-date database of module characteristics. Currently, adding new modules to the database requires calculating operational coefficients using a general purpose equation solver - a cumbersome process for the 300+ modules added on average every month. The combination of empirical regressions and heuristic methods presented herein achieve automated convergence for 99.87% of the 5487 modules in the CEC database and greatly enhance the accuracy and efficiency by which new modules can be characterized and approved for use. The added robustness also permits general purpose use of the CEC/6 parameter module model by modelers and system analysts when standard module specifications are known, even if the module does not exist in a preprocessed database.

  12. From films to thermoluminescence dosemeters: the Greek Atomic Energy Commission experience.

    PubMed

    Carinou, E; Drikos, G; Hourdakis, C; Hyvönen, H; Kamenopoulou, V

    2001-01-01

    The personnel dosimetry department of the Greek Atomic Energy Commission (GAEC) assures the individual monitoring of almost 8000 occupationally exposed workers. Thermoluminescence dosimetry systems will replace the existing photographic dosimetry system for the individual monitoring with the joint support of IAEA and GAEC. The thermoluminescence dosimetry system consists of two automated readers, one automated irradiator and about 20,000 dosemeters purchased from the Rados Co. The properties of two thermoluminescent materials have been compared: LiF has been chosen for the whole-body dosemeter configuration and Li2B4O7 for the extremities. The technical evaluation of the system has been performed according to the European and IEC standards. The overall uncertainty has been calculated. The existing database system, and the accounting and dispatching procedures have been adapted to the new demands. The system became operational on March 2000, and the official distribution of thermoluminescence dosemeters has begun. PMID:11586730

  13. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  14. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Federal Energy Regulatory Commission Form L-3 (Revised October 1975) B Appendix B to Part 221 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Pt. 221, App. B Appendix B to Part 221—Federal Energy Regulatory...

  15. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Federal Energy Regulatory Commission Form L-3 (Revised October 1975) B Appendix B to Part 221 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Pt. 221, App. B Appendix B to Part 221—Federal Energy Regulatory...

  16. U.S. Atomic Energy Commission's Environmental Research Programs Established in the 1950s

    SciTech Connect

    Reichle, D.E.

    1999-09-22

    In 1946 the United States (U.S.) Congress passed the Atomic Energy Act and with it created the Atomic Energy Commission. For the ensuing half-century the AEC and its successors have pursued biological and environmental research with an unwavering mandate to exploit the use of fissionable and radioactive material for medical purposes and, at the same time, to ensure the health of it's workers, the public, and the environment during energy technology development and use (AEC. 1961; DOE 1983; DOE, 1997). The following pages are testimony to the success of this undeviating vision (Figure 1). From the early days of the AEC, cooperation has also linked researchers from the national laboratories, the academic community, and the private sector. The AEC-sponsored research both at national laboratories and universities, and also supported graduate students to develop a cadre of health physicists, radiation biologists, and nuclear engineers. Coordinating these diverse performers has been crucial to the unique teaming that has made many of the successes possible. The success of the biological and environmental research program has often been shared with other federal agencies. The future will demand even stronger and more substantive intraagency, interagency, and international collaborations.

  17. Quality assurance and quality control programme in the Personal Dosimetry Department of the Greek Atomic Energy Commission.

    PubMed

    Kamenopoulou, V; Drikos, G; Carinou, E; Papadomarkaki, E; Askounis, P; Kyrgiakou, H; Kefalonitis, N

    2002-01-01

    A quality assurance (QA) and quality control (QC) programme was applied to the personal monitoring department (TLD based) of the Greek Atomic Energy Commission (GAEC). This programme was designed according to the recommendations of international bodies such as the International Organization for Standardization (ISO), the International Electrotechnical Commission (IEC), the International Atomic Energy Agency (IAEA) and the European Commission (CEC). This paper deals with the presentation of the QA/QC programme which includes administrative data and information, technical checking of the equipment, acceptance tests of new equipment and dosemeters, issuing and processing of the dosemeters, dose evaluation, record keeping and reporting, traceability and reproducibility, handling of complaints, internal reviews and external audits. PMID:12382742

  18. Background report for the formerly utilized Manhattan Engineer District/Atomic Energy Commission sites program

    SciTech Connect

    1980-09-01

    The Department of Energy is conducting a program to determine radiological conditions at sites formerly used by the Army Corps of Engineers' Manhattan Engineer District and the Atomic Energy Commission in the early years of nuclear energy development. Also included in the program are sites used in the Los Alamos plutonium development program and the Trinity atomic bomb test site. Materials, equipment, buildings, and land became contaminated, primarily with naturally occurring radioactive nuclides. They were later decontaminated in accordance with the standards and survey methods in use at that time. Since then, however, radiological criteria, and proposed guidelines for release of such sites for unrestricted use have become more stringent as research on the effects of low-level radiation has progressed. In addition, records documenting some of these decontamination efforts cannot be found, and the final radiological conditions of the sites could not be adequately determined from the records. As a result, the Formerly Utilized Sites Program was initiated in 1974 to identify these formerly used sites and to reevaluate their radiological status. This report covers efforts through June 1980 to determine the radiological status of sites for which the existing conditions could not be clearly defined. Principal contractor facilities and associated properties have already been identified and activities are continuing to identify additional sites. Any new sites located will probably be subcontractor facilities and areas used for disposal of contractor waste or equipment; however, only limited information regarding this equipment and material has been collected to date. As additional information becomes available, supplemental reports will be published.

  19. 77 FR 21978 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the...

  20. 76 FR 8396 - Notice of Availability of Report Commissioned by Department of Energy Entitled “Keystone XL...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF STATE Notice of Availability of Report Commissioned by Department of Energy Entitled ``Keystone XL Assessment'' Regarding the Proposed TransCanada Keystone XL Project Notice is hereby given that the Department of State received on January 31, 2011, a...

  1. Commissioning the 90 Degree Lattice for the PEP II High Energy Ring

    SciTech Connect

    Wittmer, W.; Cai, Y.; Cheng, W.X.; Colocho, W.S.; Decker, F.J.; Ecklund, S.; Fisher, A.S.; Nosochkov, Y.; Novokhatski, A.; Sullivan, M.K.; Wienands, U.; Yan, Y.T.; Yocky, G.; /SLAC

    2011-11-02

    In order to benefit from further reduction of the vertical IP beta function of the PEP-II high energy ring (HER) the bunch length should be reduced. This will be achieved by changing the phase advance from 60 degree to 90 degree in the four arcs not adjacent to the IR region, thus reducing momentum compaction by about 30% and reducing bunch length from a present 12 mm down to 8.5 mm at low beam current. In preparation to implement the 90 degree lattice the main HER quadrupole and sextupole strings and their power supplies have been reconfigured. The synchrotron tune initially will be lower but can be brought back by raising the rf voltage. Beam emittance is held at 48 nmr by introducing a significant dispersion beat in the arcs. The lattice was successfully commissioned at currents up to 800 mA in August 2007. In this paper we will compare the actual machine with the predicted behaviour, explain the correction strategies used and give an overall assessment of the operation and the benefit of the new lattice configuration.

  2. Summary history of domestic uranium procurement under US Atomic Energy Commission contracts. Final report

    SciTech Connect

    Albrethsen, H. Jr.; McGinley, F.E.

    1982-09-01

    During the period 1947 through 1970, the Atomic Energy Commission (AEC) fostered the rapid development and expansion of the domestic uranium mining and milling industry by providing a market for uranium. Some thirty-two mills were constructed during that period to produce U/sub 3/O/sub 8/ concentrates for sale to the AEC. In addition, there were various pilot plants, concentrators, upgraders, heap leach, and solution mining facilities that operated during the period. The purpose of this report is to compile a short narrative history of the AEC's uranium concentrate procurement program and to describe briefly each of the operations that produced uranium for sale to the AEC. Contractual arrangements are described and data are given on quantities of U/sub 3/O/sub 8/ purchased and prices paid. Similar data are included for V/sub 2/O/sub 5/, where applicable. Mill and other plant operating data were also compiled from old AEC records. These latter data were provided by the companies, as a contractual requirement, during the period of operation under AEC contracts. Additionally, an effort was made to determine the present status of each facility by reference to other recently published reports. No sites were visited nor were the individual reports reviewed by the companies, many of which no longer exist. The authors relied almost entirely on published information for descriptions of facilities and milling processes utilized.

  3. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    SciTech Connect

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle`s Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC).

  4. Implementation of dose management system at radiation protection board of Ghana Atomic Energy Commission.

    PubMed

    Hasford, F; Amoako, J K; Darko, E O; Emi-Reynolds, G; Sosu, E K; Otoo, F; Asiedu, G O

    2012-01-01

    The dose management system (DMS) is a computer software developed by the International Atomic Energy Agency for managing data on occupational exposure to radiation sources and intake of radionuclides. It is an integrated system for the user-friendly storage, processing and control of all existing internal and external dosimetry data. The Radiation Protection Board (RPB) of the Ghana Atomic Energy Commission has installed, customised, tested and using the DMS as a comprehensive DMS to improve personnel and area monitoring in the country. Personnel dose records from the RPBs database from 2000 to 2009 are grouped into medical, industrial and education/research sectors. The medical sector dominated the list of monitored institutions in the country over the 10-y period representing ∼87 %, while the industrial and education/research sectors represent ∼9 and ∼4 %, respectively. The number of monitored personnel in the same period follows a similar trend with medical, industrial and education/research sectors representing ∼74, ∼17 and ∼9 %, respectively. Analysis of dose data for 2009 showed that there was no instance of a dose above the annual dose limit of 20 mSv, however, 2.7 % of the exposed workers received individual annual doses >1 mSv. The highest recorded individual annual dose and total collective dose in all sectors were 4.73 mSv and 159.84 man Sv, respectively. Workers in the medical sector received higher individual doses than in the other two sectors, and average dose per exposed worker in all sectors is 0.25 mSv. PMID:21335631

  5. The Cold War legacy of regulatory risk analysis: The Atomic Energy Commission and radiation safety

    NASA Astrophysics Data System (ADS)

    Boland, Joseph B.

    From its inception in 1946 the Atomic Energy Commission pioneered the use of risk analysis as a mode of regulatory rationality and political rhetoric, yet historical treatments of risk analysis nearly always overlook the important role it played in the administration of atomic energy during the early Cold War. How this absence from history has been achieved and why it characterizes most historical accounts are the subjects of Chapter II. From there, this study goes on to develop the thesis that the advent of the atomic bomb was a world-shattering event that forced the Truman administration to choose between two novel alternatives: (1) movement towards global governance based initially on cooperative control of atomic energy or (2) unsparing pursuit of nuclear superiority. I refer to these as nuclear internationalism and nuclear nationalism, respectively. Each defined a social risk hierarchy. With the triumph of nuclear nationalism, nuclear annihilation was designated the greatest risk and a strong nuclear defense the primary means of prevention. The AEC's mission in the 1950s consisted of the rapid development of a nuclear arsenal, continual improvements in weapons technologies, and the promotion of nuclear power. The agency developed a risk-based regulatory framework through its dominant position within the National Committee on Radiation Protection. It embraced a technocratic model of risk analysis whose articulation and application it controlled, largely in secret. It used this to undergird a public rhetoric of reassurance and risk minimization. In practice, safety officials adjusted exposure levels within often wide parameters and with considerable fluidity in order to prevent safety concerns from interfering with operations. Secrecy, the political climate of the time, and a lack of accountability enabled the agency to meld technical assessments with social value judgments in a manner reflective of nuclear nationalism's risk hierarchy. In the late fifties

  6. 77 FR 74181 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc.: NEPOOL...

  7. 78 FR 36183 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the South Carolina Regional...

  8. 77 FR 11531 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission...

  9. 78 FR 4406 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the South Carolina Regional...

  10. 78 FR 36770 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  11. 77 FR 59184 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives ] notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.:...

  12. 78 FR 32386 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  13. 77 FR 63308 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  14. 78 FR 24193 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  15. 78 FR 28839 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  16. 77 FR 73645 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services,...

  17. 77 FR 14777 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.:...

  18. 78 FR 21927 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the ] transmission planning activities of the Southern Company Services,...

  19. 78 FR 39728 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  20. 78 FR 18330 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  1. 78 FR 38313 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following joint stakeholder meeting related to the transmission planning activities of PJM Interconnection,...

  2. Nuclear energy in the service of biomedicine: the U.S. Atomic Energy Commission's radioisotope program, 1946-1950.

    PubMed

    Creager, Angela N H

    2006-01-01

    The widespread adoption of radioisotopes as tools in biomedical research and therapy became one of the major consequences of the "physicists' war" for postwar life science. Scientists in the Manhattan Project, as part of their efforts to advocate for civilian uses of atomic energy after the war, proposed using infrastructure from the wartime bomb project to develop a government-run radioisotope distribution program. After the Atomic Energy Bill was passed and before the Atomic Energy Commission (AEC) was formally established, the Manhattan Project began shipping isotopes from Oak Ridge. Scientists and physicians put these reactor-produced isotopes to many of the same uses that had been pioneered with cyclotron-generated radioisotopes in the 1930s and early 1940s. The majority of early AEC shipments were radioiodine and radiophosphorus, employed to evaluate thyroid function, diagnose medical disorders, and irradiate tumors. Both researchers and politicians lauded radioisotopes publicly for their potential in curing diseases, particularly cancer. However, isotopes proved less successful than anticipated in treating cancer and more successful in medical diagnostics. On the research side, reactor-generated radioisotopes equipped biologists with new tools to trace molecular transformations from metabolic pathways to ecosystems. The U.S. government's production and promotion of isotopes stimulated their consumption by scientists and physicians (both domestic and abroad), such that in the postwar period isotopes became routine elements of laboratory and clinical use. In the early postwar years, radioisotopes signified the government's commitment to harness the atom for peace, particularly through contributions to biology, medicine, and agriculture. PMID:17575955

  3. Introduction to the journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971

    SciTech Connect

    Seaborg, G.T.

    1988-12-01

    This serves as an introduction to the 25-volume detailed daily diary kept by Glenn T. Seaborg during the time he served as Chairman of the US Atomic Energy Commission. It is a brief synopsis of some of the major issues and accomplishments of that period, 1961-1971, of US nuclear history. It is expected that the diary itself will be printed as a Lawrence Berkeley Laboratory report during the next year.

  4. Aerial Measuring System (AMS)/Israel Atomic Energy Commission (IAEC) Joint Comparison Study Report

    SciTech Connect

    Wasiolek, P.; Halevy, I.

    2013-12-23

    Under the 13th Bilateral Meeting to Combat Nuclear Terrorism conducted on January 8–9, 2013, the committee approved the development of a cost-effective proposal to conduct a Comparison Study of the Aerial Measuring System (AMS) of the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) and Israel Atomic Energy Commission (IAEC). The study was to be held at the Remote Sensing Laboratory (RSL), Nellis Air Force Base, Las Vegas, Nevada, with measurements at the Nevada National Security Site (NNSS). The goal of the AMS and the IAEC joint survey was to compare the responses of the two agencies’ aerial radiation detection systems to varied radioactive surface contamination levels and isotopic composition experienced at the NNSS, and the differing data processing techniques utilized by the respective teams. Considering that for the comparison both teams were using custom designed and built systems, the main focus of the short campaign was to investigate the impact of the detector size and data analysis techniques used by both teams. The AMS system, SPectral Advanced Radiological Computer System, Model A (SPARCS-A), designed and built by RSL, incorporates four different size sodium iodide (NaI) crystals: 1" × 1", 2" × 4" × 4", 2" × 4" ×16", and an “up-looking” 2" × 4" × 4". The Israel AMS System, Air RAM 2000, was designed by the IAEC Nuclear Research Center – Negev (NRCN) and built commercially by ROTEM Industries (Israel) and incorporates two 2" diameter × 2" long NaI crystals. The operational comparison was conducted at RSL-Nellis in Las Vegas, Nevada, during week of June 24–27, 2013. The Israeli system, Air RAM 2000, was shipped to RSL-Nellis and mounted together with the DOE SPARCS on a DOE Bell-412 helicopter for a series of aerial comparison measurements at local test ranges, including the Desert Rock Airport and Area 3 at the NNSS. A 4-person Israeli team from the IAEC NRCN supported the activity together with 11

  5. 76 FR 1335 - Supplemental Standards of Ethical Conduct for Employees of the Federal Energy Regulatory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ...; 5 U.S.C. App. (Ethics in Government Act of 1978); 42 U.S.C. 7171, 7172; E.O. 12674, 54 FR 15159, 3 CFR, 1989 Comp., p. 215, as modified by E.O. 12731, 55 FR 42547, 3 CFR, 1990 Comp., p. 306; 5 CFR 2635... Commission 5 CFR Part 3401 Supplemental Standards of Ethical Conduct for Employees of the Federal...

  6. 77 FR 24485 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following...

  7. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  8. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  9. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  10. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  11. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within...

  12. Guidelines for residential commissioning

    SciTech Connect

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  13. Commissioning MMS

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  14. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  15. 77 FR 52020 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... information, contact Jesse Hensley, Office of Energy Market Regulation, Federal Energy Regulatory Commission... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy...

  16. Journal of Glenn T. Seaborg (Chairman, US Atomic Energy Commission, 1961 through 1971), July 1, 1961--December 31, 1961

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    This introduction to my journal of 1961--1971, covering my years of service as Chairman of the US Atomic Energy Commission, is written from the perspective of 1971, in order to reflect the attitudes expressed in my journal, which was written on a daily basis during that period. Thus, I express the points of view of that time rather than those of today (1988), which might occasionally be somewhat different. The journal consists of 25 volumes, averaging 700 pages each. This comprises about 15,000 items consisting of the approximately 4,000 daily journal entries and the average of about three attachments per day. The journal has three sections corresponding to each of the three presidents I served as chairman of the Atomic Energy Commission -- the first six volumes covering the John F. Kennedy years (February 1, 1961--November 22, 1963), the next 11 volumes covering the Lyndon B. Johnson years (November 22, 1963--January 20, 1969) and the final eight volumes, the Richard M. Nixon years and a few months of post-AEC chairman activities in Washington (January 20, 1969--November 6, 1971).

  17. 76 FR 15305 - Moussa I. Kourouma d/b/a Quntum Energy LLC; Notice of Designation of Commission Staff as Non...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Moussa I. Kourouma d/b/a Quntum Energy LLC; Notice of Designation of.... Dated: March 14, 2011. Kimberly D. Bose, Secretary. BILLING CODE 6717-01-P...

  18. 77 FR 50492 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  19. 77 FR 73645 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  20. 77 FR 38045 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  1. 77 FR 28869 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.: 2012...

  2. 77 FR 31004 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  3. 77 FR 47620 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, LLC (PJM): PJM...

  4. 77 FR 3764 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission System...

  5. 77 FR 42300 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  6. 77 FR 64983 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  7. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  8. 76 FR 76157 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  9. 77 FR 58376 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  10. 77 FR 38046 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc.: 2012...

  11. 77 FR 34034 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  12. 76 FR 60820 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission System...

  13. 77 FR 37665 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the North Carolina Transmission Planning...

  14. 77 FR 40606 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System...

  15. 77 FR 6556 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  16. 77 FR 21765 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  17. Commissioning and early experience with a new-generation low-energy linear accelerator with advanced delivery and imaging functionalities

    PubMed Central

    2011-01-01

    Background A new-generation low-energy linear accelerator (UNIQUE) was introduced in the clinical arena during 2009 by Varian Medical Systems. The world's first UNIQUE was installed at Oncology Institute of Southern Switzerland and put into clinical operation in June 2010. The aim of the present contribution was to report experience about its commissioning and first year results from clinical operation. Methods Commissioning data, beam characteristics and the modeling into the treatment planning system were summarized. Imaging system of UNIQUE included a 2D-2D matching capability and tests were performed to identify system repositioning capability. Finally, since the system is capable of delivering volumetric modulated arc therapy with RapidArc, a summary of the tests performed for such modality to assess its performance in preclinical settings and during clinical usage was included. Results Isocenter virtual diameter was measured as less than 0.2 mm. Observed accuracy of isocenter determination and repositioning for 2D-2D matching procedures in image guidance was <1.2 mm. Concerning reproducibility and stability over a period of 1 year, deviations from reference were found <0.3 ± 0.2% for linac output, <0.1% for homogeneity, similarly to symmetry. Rotational accuracy of the entire gantry-portal imager system showed a maximum deviation from nominal 0.0 of <1.2 mm. Pre treatment quality assurance of RapidArc plans resulted with a Gamma Agreement Index (fraction of points passing the gamma criteria) of 97.0 ± 1.6% on the first 182 arcs verified. Conclusions The results of the commissioning tests and of the first period of clinical operation, resulted meeting specifications and having good margins respect to tolerances. UNIQUE was put into operation for all delivery techniques; in particular, as shown by the pre-treatment quality assurance results, it enabled accurate and safe delivery of RapidArc plans. PMID:21961830

  18. A Guide to Building Commissioning

    SciTech Connect

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  19. SPEAR3 Commissioning

    SciTech Connect

    Harkay, K.; Sajaev, V.; Boland, M.J.; Tan, Y.E.; Krinsky, S.; Podobedov, B.; Decking, W.; Ropert, A.; Byrd, J.M.; Robin, D.; Scarvie, T.; Steier, C.; Fedurin, M.G.; Jines, P.; Chang, H.-P.; Kuo, C.-C.; Tsai, H.-J.; Yoon, M.H.; Boge, M.; Allison, S.; Bellomo, P.; /SLAC, SSRL /SOLEIL, Saint-Aubin

    2005-05-09

    The successful commissioning of the new SPEAR3 light source at the Stanford Synchrotron Radiation Laboratory (SSRL) will be reviewed. Orbit control, beam-based alignment, and an orbit interlock were commissioned. Orbit motion was characterized as a function of frequency. The linear optics was corrected for ID focusing and coupling errors. The nonlinear optics were investigated with dynamic aperture measurements as a function of energy and tune.

  20. 10 CFR 2.806 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Commission action. 2.806 Section 2.806 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Rulemaking § 2.806 Commission action. The Commission will incorporate in the notice of adoption of a regulation...

  1. 10 CFR 110.91 - Commission consultations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission consultations. 110.91 Section 110.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Public Participation Procedures Concerning License Applications § 110.91 Commission consultations. The Commission...

  2. PRESTO, the on-line photon energy spectrometer at FERMI: design, features and commissioning results.

    PubMed

    Svetina, Cristian; Cocco, Daniele; Mahne, Nicola; Raimondi, Lorenzo; Ferrari, Eugenio; Zangrando, Marco

    2016-01-01

    Measurement of the emission wavelength and the spectral content of the photon radiation is essential information for both machine and experimental physicists at a free-electron laser (FEL) user facility. Knowledge of the photon beam spectral properties is needed during the machine optimization and for performing machine studies (i.e. monitoring the change of the FEL output as a function of the machine parameters). The experimentalists, on the other hand, need to know the photon beam spectral distribution of the source, shot to shot, to discriminate the acquired data. Consequently, the main requirement for the instrument, supposed to obtain this information, is the capability of working on-line and shot-to-shot, with minimal perturbation of the beam delivered to the experimental stations. Starting from the grating fundamental equations, the conceptual design of the FERMI Pulse-Resolved Energy Spectrometer: Transparent and On-line (PRESTO) is presented, explaining the optical design in detail. The performance of PRESTO, in terms of resolving power, efficiency and spectral response, is also discussed. Finally, some useful features beyond the usual measurement of the energy spectrum are reported, as they have been routinely used by both machine and experimental physicists. PMID:26698043

  3. 77 FR 47050 - Commission Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities; Comment Request AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Comment request. SUMMARY: In compliance with...

  4. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... force for construction of any such alterations to the project. Construction of said alterations or any... operation, as may be ordered by the Commission upon its own motion or upon the recommendation of the... Commission during the term of this license upon its own motion or upon the recommendation of the Secretary...

  5. U.S. Nuclear Regulatory Commission Role and Activities Related to U.S. Department of Energy Incidental Waste Determinations

    SciTech Connect

    Bradford, A.H.; Esh, D.W.; Ridge, A.C.

    2006-07-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. Under the NDAA, NRC performs consultative technical reviews of DOE's waste determinations and monitors DOE's disposal actions for such waste, but the NRC does not have regulatory authority over DOE's waste disposal activities. The NDAA provides the criteria that must be met to determine that waste is not HLW. The criteria require that the waste does not need to be disposed of in a geologic repository, that highly radioactive radionuclides be removed to the maximum extent practical, and that the performance objectives of 10 CFR 61, Subpart C, be met. The performance objectives contain criteria for protection of the public, protection of inadvertent intruders, protection of workers, and stability of the disposal site after closure. This paper describes NRC's approach to implementing its responsibilities under the NDAA, as well as similar activities being performed for sites not covered by the NDAA. (authors)

  6. Understanding the response of commercial and institutional organizations to the California energy crisis. A report to the California Energy Commission - Sylvia Bender, Project Manager

    SciTech Connect

    Lutzenhiser, Loren; Janda, Kathryn; Kunkle, Rick; Payne, Christopher

    2002-07-24

    Beginning in the summer of 2000, California experienced serious energy supply problems, sharp increases in wholesale (and retail) electricity and natural gas prices, and isolated blackouts. In response to the rapidly worsening electricity situation in California in late 2000, the state set, as an initial goal, the reduction of the state's peak demand for the summer of 2001 by 5,000 megawatts. To meet this goal, the governor and legislature took a variety of steps to enhance supply, encourage rapid voluntary reductions in demand, and provide incentives for actions that would result in load reductions. Three bills-Assembly Bill 970, Senate Bill X1 5 and Assembly Bill X1 29-allocated roughly $950 million for consumption and demand reduction programs. The governor also enacted a variety of additional measures, including the ''Flex Your Power'' (media awareness and direct business involvement) campaign, requirements for retail sector outdoor lighting reductions, and toughening of energy efficiency building codes. There were, in fact, significant reductions in electricity demand in California during the summer of 2001 and the large number of expected supply disruptions was avoided. To understand the nature of these demand reductions and the motivations for consumer response, Washington State University (WSU) undertook a study for the California Energy Commission (CEC) focusing on conservation behavior in the residential, commercial, and agricultural sectors. The research presented in this report represents an exploration of the response of commercial and institutional organizations to the California energy situation and the unique set of influences that existed during this time. These influences included informational messages and media attention, program interventions, price changes, and external triggering events (e.g., blackouts). To better understand the effects of these influences on organizational response to the energy situation, we conducted 84 semi

  7. 76 FR 63921 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ...Energy Service Company. FOR MORE INFORMATION CONTACT: Jonathan Fernandez, Office of Energy Market... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy...

  8. 78 FR 26361 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc., New York...

  9. 77 FR 30003 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  10. 77 FR 3765 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator,...

  11. 78 FR 14783 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc., New York...

  12. 77 FR 42717 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C....

  13. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP):...

  14. 78 FR 37214 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc. and...

  15. 10 CFR 2.1331 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Commission action. 2.1331 Section 2.1331 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1331 Commission action. (a) Upon completion of...

  16. 10 CFR 110.113 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission action. 110.113 Section 110.113 Energy NUCLEAR... Commission action. (a) Upon completion of a hearing, the Commission will issue a written opinion including... hearing issues; and (4) Take other action, as appropriate....

  17. 10 CFR 110.40 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Commission review. 110.40 Section 110.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Review of License Applications § 110.40 Commission review. (a) Immediately after receipt of a license application for an...

  18. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema

    Paul Saueressig

    2010-09-01

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  19. 75 FR 25850 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy...- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information may also be available at http... to CommissionDFO@nuclear.energy.gov , or post comments on the Commission Web site at...

  20. 76 FR 4646 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy... facsimile (202) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information will be... to CommissionDFO@nuclear.energy.gov , or post comments on the Commission Web site at...

  1. Water supply for the Nuclear Rocket Development Station at the U.S. Atomic Energy Commission's Nevada Test Site

    USGS Publications Warehouse

    Young, Richard Arden

    1972-01-01

    The Nuclear Rocket Development Station, in Jackass Flats, occupies about 123 square miles in the southwestern part of the U.S. Atomic Energy Commission's Nevada Test Site. Jackass Flats, an intermontane valley bordered by highlands on all sides except for a drainage outlet in the southwestern corner, has an average annual rainfall of 4 inches. Jackass Flats is underlain by alluvium, colluvium, and volcanic rocks of Cenozoic age and, at greater depth, by sedimentary rocks of Paleozoic age. The alluvium and the colluvium lie above the saturated zone throughout nearly all of Jackass Flats. The Paleozoic sedimentary rocks contain limestone and dolomite units that are excellent water producers elsewhere ; however, these units are too deep in Jackass Flats to be economic sources of water. The only important water-producing unit known in the vicinity of the Nuclear Rocket Development Station is a welded-tuff aquifer, the Topopah Spring Member of the Paintbrush Tuff, which receives no significant recharge. This member contains about 500 feet of highly fractured rock underlying an area 11 miles long and 3 miles wide in western Jackass Flats. Permeability of the aquifer is derived mostly from joints and fractures; however, some permeability may be derived from gas bubbles in the upper part of the unit. Transmissivity, obtained from pumping tests, ranges from 68,000 to 488,000 gallons per day per foot. Volume of the saturated part of the aquifer is about 3.5 cubic miles, and the average specific yield probably ranges from 1 to 5 percent. The volume of ground water in storage is probably within the range of 37-187 billion gallons. This large amount of water should be sufficient to supply the needs of the Nuclear Rocket Development Station for many years. Water at the Nuclear Rocket Development Station is used for public supply, construction, test-cell coolant, exhaust cooling, and thermal shielding during nuclear reactor and engine testing, and washdown. Present (1967) average

  2. 75 FR 28285 - In the Matter of Certain Energy Drink Products; Notice of Commission Decision Not To Review an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-20

    ...Notice is hereby given that the U.S. International Trade Commission has determined not to review a final initial determination (``final ID'') (Order No. 34) issued by the presiding administrative law judge (``ALJ'') finding a violation of Section 337 of the Tariff Act of 1930, as amended (``section 337'') in the above-identified...

  3. Nuclear Regulatory Commission issuances

    SciTech Connect

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  4. OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP

    SciTech Connect

    Langton, C.; Burns, H.

    2009-05-29

    a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4

  5. From gas to electric at FERC: Will it be deja vu all over again. [Federal Energy Regulatory Commission

    SciTech Connect

    Bobbish, D.J. )

    1992-06-01

    Recent legislative proposals to increase FERC's authority to require electric utilities to provide transmission service to third parties ( wheeling') and to encourage the development of independent power producers (IPPs) suggest that FERC may soon have the necessary legislative mandate to 436' the electric utility industry - to pursue at a faster pace the same sort of restructuring it has been following since at least 1988. In view of the possibility that the electric industry may be reformed in a way that parallels the natural gas industry in some fashion, this paper examines how the Commission has gone about restructuring the natural gas industry over the past seven years, and what lessons the Commission should have learned from that experience and whether recent developments at FERC on the electric side indicate that it has learned those lessons.

  6. 76 FR 64939 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings:...

  7. 77 FR 60980 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting...

  8. Commissioning the Majorana Demonstrator

    NASA Astrophysics Data System (ADS)

    Xu, Wenqin; Majorana Collaboration

    2016-03-01

    The Majorana Demonstrator deploys high purity germanium (HPGe) detector modules to search for neutrinoless double beta (0 νββ) decay in 76Ge. The experiment is aimed at demonstrating the technical feasibility and low backgrounds for a next generation Ge-based BBz experiment. The program of testing and commissioning the Demonstrator modules is a critical step to debug and improve the experimental apparatus, to establish and refine operational procedures, and to develop data analysis tools. In this talk, we will discuss our experience commissioning the Demonstrator modules and show how this program leads to successful data-taking. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics, the Particle Astrophysics and Nuclear Physics Programs of the National Science Foundation, and the Sanford Underground Research Facility.

  9. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  10. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  11. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  12. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  13. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as...

  14. The use of a diode matrix in commissioning activities for electron energies {>=}9 MeV: A feasibility study

    SciTech Connect

    Casanova Borca, Valeria; Pasquino, Massimo; Ozzello, Franca; Tofani, Santi

    2009-04-15

    The contribution of a commercially available diode matrix (MapCHECK trade mark sign , provided by Sun Nuclear, Melbourne, FL) for the commissioning procedures of the voxel based Monte Carlo (VMC++) algorithm for electron beams of MasterPlan treatment planning system was investigated. The attention is mainly focused on the calculation in homogeneous and heterogeneous phantoms. With this aim, following a data set similar to that proposed by Electron Collaborative Working Group (ECWG), the dose profiles and two-dimensional (2D) dose distributions measured by the diode matrix were compared with the calculated ones using the gamma analysis method with acceptance criteria for the dose difference and the distance to agreement equal to 4% and 4 mm, respectively. The average and standard deviation of the percentage of points satisfying the constraint {gamma}{<=}1 are 98.3{+-}4.1% and 99.3{+-}1.7% for the 9 and 12 MeV electron beam, respectively, showing that the accuracy of MasterPlan electron beam algorithm is good for simple two-dimensional geometries as well as for more complicated three-dimensional ones. The results are in agreement with those reported in literature by Cygler et al. [''Evaluation of the first commercial Monte Carlo dose calculation engine for electron beam treatment planning,'' Med. Phys. 31, 142-153 (2004)]. In addition, the authors have also analyzed the response of the 2D array in terms of dose profiles at different depths, comparing the results with those obtained in water phantom using an electron diode. The results show that in the low gradient regions there were no deviations larger than the criteria of acceptability set by Van Dyk et al. [''Commissioning and quality assurance of treatment planning computers,'' Int. J. Radiat. Oncol. Biol. Phys. 26, 261-273 (1993)]; in the high gradient region, the maximum deviations are less than 2 mm with most of the values less than 1 mm. The present article shows that MapCHECK trade mark sign can play a

  15. 76 FR 7839 - Notice of Commission and Commission Staff Attendance at ISO/RTO Council and Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Energy Regulatory Commission Notice of Commission and Commission Staff Attendance at ISO/RTO Council and... of the Commission and Commission staff may attend the following ISO/RTO Council and Regional State..., RTO/ISO Performance Metrics. For more information, contact Sandra Waldstein, Office of...

  16. 10 CFR 62.25 - Criteria for a Commission determination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Criteria for a Commission determination. 62.25 Section 62.25 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CRITERIA AND PROCEDURES FOR EMERGENCY ACCESS TO NON-FEDERAL AND REGIONAL LOW-LEVEL WASTE DISPOSAL FACILITIES Issuance of a Commission Determination § 62.25 Criteria for a Commission determination....

  17. 77 FR 30003 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): Combined...

  18. 77 FR 70160 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  19. 77 FR 36532 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  20. 76 FR 66060 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  1. 77 FR 60980 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Mid-Continent Area Power Pool (MAPP) and...

  2. 77 FR 75630 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc., New York Independent...

  3. 77 FR 65680 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  4. 77 FR 35959 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following teleconference related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Seams FERC...

  5. 77 FR 19011 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  6. 77 FR 75630 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  7. 77 FR 64982 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): Midwest...

  8. 77 FR 64332 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of ISO New England Inc., New York Independent...

  9. 77 FR 37664 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  10. 76 FR 66061 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings: of...): MISO Planning Advisory Committee, October 25, 2011, 9 a.m.-4 p.m., Local Time. MISO RECB Task...

  11. 77 FR 42718 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): ] Order...

  12. 77 FR 50098 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  13. 78 FR 9688 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  14. 77 FR 63307 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Seams FERC...

  15. 77 FR 24486 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  16. 77 FR 16221 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  17. 77 FR 12277 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  18. 77 FR 34378 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc....

  19. 77 FR 52714 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  20. 76 FR 64343 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of ISO New England Inc.: Order 1000: NEPOOL...

  1. 76 FR 64083 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): SPP...

  2. 77 FR 50097 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  3. 77 FR 71584 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP...

  4. 77 FR 42490 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings and/or teleconferences related to the transmission planning activities of the Southwest Power Pool,...

  5. 77 FR 50097 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM...

  6. 77 FR 41181 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meeting related to the transmission planning activities of New York Independent System Operator, Inc.: Joint...

  7. Journal of Glenn T. Seaborg, Chairman of the US Atomic Energy Commission, 1961--1971: Volume 1, February 1, 1961--June 30, 1961

    SciTech Connect

    Seaborg, G.T.

    1989-01-01

    This introduction to my journal of 1961--1971, covering my years of service as Chairman of the US Atomic Energy Commission, is written from the perspective of 1971, in order to reflect the attitudes expressed in my journal, which was written on a daily basis during that period. Thus, I express the points of view of that time rather than those of today (1988), which might occasionally be somewhat different. The journal consists of 25 volumes, averaging 700 pages each. This comprises about 15,000 items consisting of the approximately 4000 daily entries and the average of about three attachments per day. The journal has three sections corresponding to each of the three presidents I served as chairman of the Atomic Energy Commission -- the first six volumes covering the John F. Kennedy years (February 1, 1961--November 22, 1963), the next 11 volumes covering the Lyndon B. Johnson years (November 22, 1963--January 20, 1969) and the final eight volumes, the Richard M. Nixon years and a few months of post-AEC chairman activities in Washington (January 20, 1969--November 6, 1971.)

  8. 78 FR 26766 - Commission Information Collection Activities (FERC Form 580); Comment Request; Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC Form 580); Comment Request; Revision AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of information...

  9. 76 FR 66920 - Commission Information Collection Activities (FERC-549); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities (FERC-549); Comment Request; Submitted for OMB Review AGENCY: Federal Energy Regulatory Commission. ACTION: Notice. SUMMARY:...

  10. Monitoring distant fallout: the role of the Atomic Energy Commission Health and Safety Laboratory during the Pacific tests, with special attention to the events following BRAVO.

    PubMed

    Eisenbud, M

    1997-07-01

    The fallout from test BRAVO in March 1954 has had scientific, political, and social implications that have continued for more than 40 years. The test resulted in serious injury to the people of the Marshall Islands and 23 men on a nearby Japanese fishing boat. Prior to BRAVO there was insufficient appreciation of the dangers of fallout to people living downwind from surface or near-surface explosions of megaton weapons. In the absence of sufficient preplanning for fallout monitoring beyond the test-sites of earlier smaller yield tests, and as a result of the concern of the photographic film manufacturers, the Atomic Energy Commission Health and Safety Laboratory, now the Department of Energy Environmental Measurements Laboratory, was requested to develop a program of fallout surveillance. Beginning with Operation IVY in 1952, these surveys included aerial monitoring of the islands of the mid and western Pacific, as well as establishment of fallout monitoring stations in the United States and abroad. The first evidence of the post-BRAVO fallout was detected by a Atomic Energy Commission Health and Safety Laboratory instrument installed on the atoll of Rongerik, where 28 military personnel were stationed. The results of radiation surveys conducted immediately after BRAVO, as well as the reports of medical investigations, radioecological studies, and dose reconstruction that have been conducted by many laboratories over the years have been available from the beginning in unclassified form. However, from the time of the fallout, and continuing to the present, there have been many unanswered questions about what happened during the hours immediately after the fallout was reported. No formal investigation of the circumstances of the fallout was ever conducted, and there were serious misrepresentations of the facts in the official statements made at the time. PMID:9199215

  11. Economic Commission Report

    ERIC Educational Resources Information Center

    American Indian Journal, 1977

    1977-01-01

    Summarizing presentations and discussions of the Economic Commission of the International Non-Governmental Organizations Conference on Discrimination Against Indigenous Populations (1977), this report addresses: multinational corporations; the land question; and the Commission's recommended "Plan of Action". (JC)

  12. 75 FR 13757 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Blue Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy... announcing an open meeting of the Blue Ribbon Commission on America's Nuclear Future (the Commission)....

  13. Preliminary Analysis on Linac Oscillation Data LI05-19 and Wake Field Energy Loss in FACET Commissioning 2012

    SciTech Connect

    Sun, Yipeng; /SLAC

    2012-07-23

    In this note, preliminary analysis on linac ocsillation data in FACET linac LI05-09 plus LI11-19 is presented. Several quadrupoles are identified to possibly have different strength, compared with their designed strength in the MAD optics model. The beam energy loss due to longitudinal wake fields in the S-band linac is also analytically calculated, also by LITRACK numerical simulations.

  14. Commissioning HVAC systems

    SciTech Connect

    Schiess, K.

    1995-12-01

    In recent years, commissioning has been viewed as a separate process that had to be specified and implemented by a specialized entity. This article discusses commissioning in the HVAC field and looks at it from an international perspective. The author has worked in Europe, South Africa (British system) and the USA. The differences between the British and the American methods of commissioning are discussed, with examples given where the American way was unsuccessful. It is the design engineer`s job to test and accept (commission) an installation after the contractor has demonstrated the performance to the satisfaction of the design engineer. Once the plant is commissioned, it is put into service.

  15. Experiments in progress: The geography of science in the Atomic Energy Commission's peaceful uses of nuclear explosives program, 1956-1973

    NASA Astrophysics Data System (ADS)

    Kirsch, Scott Lawrence

    From 1957 to 1973, the United States Atomic Energy Commission (AEC) actively pursued the "peaceful uses of nuclear explosives" through Project Plowshare. Nuclear excavation, the detonation of shallowly buried hydrogen bombs for massive earthmoving projects like harbors and canals, was considered the most promising of the Plowshare applications, and for a time, the most economically and technically "feasible." With a basis in and contributing to theory in critical human geography and science studies, the purpose of this dissertation is to examine the collisions of science, ideology, and politics which kept Plowshare designs alive--but only as "experiments in progress." That is, this research asks how the experimental program persisted in places like the national weapons laboratory in Livermore, California, and how its ideas were tested at the nuclear test site in Nevada, yet Plowshare was kept out of those spaces beyond AEC control. Primary research focuses on AEC-related archival materials collected from the Department of Energy Coordination and Information Center, Las Vegas, Nevada, and from the Lawrence Livermore National Laboratory, as well as the public discourse through which support for and opposition to Plowshare projects was voiced. Through critical analysis of Plowshare's grandiose "geographical engineering" schemes, I thus examine the complex relations between the social construction of science and technology, on one hand, and the social production of space, on the other.

  16. Solid cancer mortality associated with chronic external radiation exposure at the French atomic energy commission and nuclear fuel company.

    PubMed

    Metz-Flamant, C; Samson, E; Caër-Lorho, S; Acker, A; Laurier, D

    2011-07-01

    Studies of nuclear workers make it possible to directly quantify the risks associated with ionizing radiation exposure at low doses and low dose rates. Studies of the CEA (Commissariat à l'Energie Atomique) and AREVA Nuclear Cycle (AREVA NC) cohort, currently the most informative such group in France, describe the long-term risk to nuclear workers associated with external exposure. Our aim is to assess the risk of mortality from solid cancers among CEA and AREVA NC nuclear workers and its association with external radiation exposure. Standardized mortality ratios (SMRs) were calculated and internal Poisson regressions were conducted, controlling for the main confounding factors [sex, attained age, calendar period, company and socioeconomic status (SES)]. During the period 1968-2004, there were 2,035 solid cancers among the 36,769 CEA-AREVA NC workers. Cumulative external radiation exposure was assessed for the period 1950-2004, and the mean cumulative dose was 12.1 mSv. Mortality rates for all causes and all solid cancers were both significantly lower in this cohort than in the general population. A significant excess of deaths from pleural cancer, not associated with cumulative external dose, was observed, probably due to past asbestos exposure. We observed a significant excess of melanoma, also unassociated with dose. Although cumulative external dose was not associated with mortality from all solid cancers, the central estimated excess relative risk (ERR) per Sv of 0.46 for solid cancer mortality was higher than the 0.26 calculated for male Hiroshima and Nagasaki A-bomb survivors 50 years or older and exposed at the age of 30 years or older. The modification of our results after stratification for SES demonstrates the importance of this characteristic in occupational studies, because it makes it possible to take class-based lifestyle differences into account, at least partly. These results show the great potential of a further joint international study of

  17. Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    van Driel-Gesztelyi, Lidia; Schrijver, Carolus J.; Klimchuk, James A.; Charbonneau, Paul; Fletcher, Lyndsay; Hasan, S. Sirajul; Hudson, Hugh S.; Kusano, Kanya; Mandrini, Cristina H.; Peter, Hardi; Vršnak, Bojan; Yan, Yihua

    2012-04-01

    Commission 10 of the International Astronomical Union has more than 650 members who study a wide range of activity phenomena produced by our nearest star, the Sun. Solar activity is intrinsically related to solar magnetic fields and encompasses events from the smallest energy releases (nano- or even picoflares) to the largest eruptions in the Solar System, coronal mass ejections (CMEs), which propagate into the Heliosphere reaching the Earth and beyond. Solar activity is manifested in the appearance of sunspot groups or active regions, which are the principal sources of activity phenomena from the emergence of their magnetic flux through their dispersion and decay. The period 2008-2009 saw an unanticipated extended solar cycle minimum and unprecedentedly weak polar-cap and heliospheric field. Associated with that was the 2009 historical maximum in galactic cosmic rays flux since measurements begun in the middle of the 20th Century. Since then Cycle 24 has re-started solar activity producing some spectacular eruptions observed with a fleet of spacecraft and ground-based facilities. In the last triennium major advances in our knowledge and understanding of solar activity were due to continuing success of space missions as SOHO, Hinode, RHESSI and the twin STEREO spacecraft, further enriched by the breathtaking images of the solar atmosphere produced by the Solar Dynamic Observatory (SDO) launched on 11 February 2010 in the framework of NASA's Living with a Star program. In August 2012, at the time of the IAU General Assembly in Beijing when the mandate of this Commission ends, we will be in the unique position to have for the first time a full 3-D view of the Sun and solar activity phenomena provided by the twin STEREO missions about 120 degrees behind and ahead of Earth and other spacecraft around the Earth and ground-based observatories. These new observational insights are continuously posing new questions, inspiring and advancing theoretical analysis and

  18. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA)...

  19. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to...

  20. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets...

  1. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No....

  2. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to...

  3. Coordination of the U.S. DOE-Argentine National Atomic Energy Commission (CNEA) science and technology implementing arrangement. Final report

    SciTech Connect

    Ebadian, M.A.

    1998-01-01

    In 1989, the US Department of Energy (DOE) established the Office of Environmental Management (EM) and delegated to the office the responsibility of cleaning up the US nuclear weapons complex. EM`s mission has three primary activities: (1) to assess, remediate, and monitor contaminated sites and facilities; (2) to store, treat, and dispose of wastes from past and current operations; and (3) to develop and implement innovative technologies for environmental remediation. To this end, EM has established domestic and international cooperative technology development programs, including one with the Republic of Argentina. Cooperating with Argentine scientific institutes and industry meets US cleanup objectives by: (1) identifying and accessing Argentine EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) fostering the development of innovative environmental technologies by increasing US private sector opportunities in Argentina in EM-related areas. Florida International University`s Hemispheric Center for Environmental Technology (FIU-HCET) serves as DOE-OST`s primary technology transfer agent. FIU-HCET acts as the coordinating and managing body for the Department of Energy (DOE)-Argentina National Atomic Energy Commission (CNEA) Arrangement. Activities include implementing standard operating procedures, tracking various technical projects, hosting visiting scientists, advising DOE of potential joint projects based on previous studies, and demonstrating/transferring desired technology. HCET hosts and directs the annual Joint Coordinating Committee for Radioactive and Mixed Waste Management meeting between the DOE and CNEA representatives. Additionally, HCET is evaluating the possibility of establishing similar arrangements with other Latin American countries.

  4. THE COLLEGE COMMISSIONS.

    ERIC Educational Resources Information Center

    FOOKS, JOYCE LANE

    THE HISTORIES, ORGANIZATIONAL STRUCTURES, MODES OF OPERATION, GOALS, AND SPECIFIC ACTIVITIES OF EIGHT COLLEGE SCIENCE COMMISSIONS ARE PRESENTED. THE GOAL OF THE EIGHT COLLEGE SCIENCE COMMISSIONS IS TO BRING UNDERGRADUATE SCIENCE INSTRUCTION CLOSER TO THE RESEARCH FRONTIER, UPDATE COURSES, AND FOSTER THE SPIRIT OF INQUIRY. INTERCOMMISSION…

  5. Commissioning of HVAC systems

    SciTech Connect

    Schiess, K.

    1995-06-01

    In recent years various presentation and discussions have taken place which looked at commissioning as a separate process that had to be specified and implemented by a specialized entity in a project. This presentation discusses commissioning in the HVAC field and looks at it from an international perspective. The author has worked in Europe, South Africa (British system) and in the USA. The differences are discussed between the British and the American methods with some examples where the American way of commissioning was unsuccessful. The conclusion is that it is the design engineer`s job to test and accept (commission) an installation after the contractor has demonstrated the performance to the satisfaction of the design engineer. Once the plant is commissioned, it is put into service.

  6. Federal Trade Commission

    MedlinePlus

    ... Events Press Releases Commission Actions Media Resources Consumer Finance Mergers and Competition Mobile Technology The Do Not ... Advice For Consumers Business Center Advertising & Marketing Credit & Finance Guidance Privacy & Security Selected Industries Legal Resources Business ...

  7. Commissioning the LCLS Injector

    SciTech Connect

    Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Iverson, R.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Schmerge, J.; Turner, J.; Welch, J.; White, W.; Wu, J.; /SLAC

    2007-11-28

    The Linac Coherent Light Source (LCLS) is a SASE x-ray Free-Electron Laser (FEL) project presently under construction at SLAC. The injector section, from drive laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam was completed in August 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch clearly demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photo-cathode drive laser, RF gun, photocathode, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  8. Nuclear Regulatory Commission issuances

    SciTech Connect

    Not Available

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  9. Commission 53: Extrasolar Planets

    NASA Astrophysics Data System (ADS)

    Boss, Alan; Lecavelier des Etangs, Alain; Mayor, Michel; Bodenheimer, Peter; Collier-Cameron, Andrew; Kokubo, Eiichiro; Mardling, Rosemary; Minniti, Dante; Queloz, Didier

    2012-04-01

    Commission 53 was created at the 2006 Prague General Assembly (GA) of the IAU, in recognition of the outburst of astronomical progress in the field of extrasolar planet discovery, characterization, and theoretical work that has occurred since the discovery of the first planet in orbit around a solar-type star in 1995. Commission 53 is the logical successor to the IAU Working Group on Extrasolar Planets (WGESP), which ended its six years of existence in August 2006. The founding President of Commission 53 was Michael Mayor, in honor of his seminal contributions to this new field of astronomy. The current President is Alan Boss, the former chair of the WGESP. The current members of the Commission 53 (C53) Organizing Committee (OC) began their service in August 2009 at the conclusion of the Rio de Janeiro IAU GA.

  10. Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  11. 75 FR 81592 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Ribbon Commission on America's Nuclear Future AGENCY: Department of Energy, Office of Nuclear Energy...) 586- 0544; e-mail CommissionDFO@nuclear.energy.gov . Additional information may also be available at.... Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585, e-mail to...

  12. 76 FR 71334 - Blue Ribbon Commission on America's Nuclear Future

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-17

    ... Ribbon Commission on America's Nuclear Future AGENCY: Office of Nuclear Energy, Department of Energy...; telephone (202) 586-4243; facsimile (202) 586- 0544; or email: CommissionDFO@nuclear.energy.gov . Additional... Energy, 1000 Independence Avenue SW., Washington DC 20585, or email:...

  13. Commission 4: Ephemerides

    NASA Astrophysics Data System (ADS)

    Fukushima, Toshio; Kaplan, George H.; Krasinsky, George A.; Arlot, Jean-Eudes; Bangert, John A.; Hohenkerk, Catherine; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrak, Jan

    2010-05-01

    Dr. George Kaplan, the current Vice-President of the Commission was nominated to be the new President. Dr. Catherine Hohenkerk was elected to be the next Vice-President of the Commission. As for the Membership of the Organizing Committee, Dr. Vondrak stepped down and Drs William Folkner of JPL and Steve Bell of HMNAO have been added. In the below, we present summaries of the reports from various institutions presented at the business session.

  14. 77 FR 10599 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... conducted by the Commission on February 16, 2012; notice of which was published in 77 FR 3321, January 23... COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on March 15, 2012, in...

  15. Investigation of the persistence of new building commissioning

    SciTech Connect

    Potter, Amanda; Friedman, Hannah; Haasl, Tudi; Claridge, David

    2002-03-17

    Commissioning is gaining increasing recognition as a cost-effective strategy for reducing commercial building energy use. Although the success and cost-effectiveness of commissioning projects depends on how well the benefits of commissioning persist over time, this aspect of commissioning is not well understood. The persistence of commissioning benefits was recently studied in a PIER project evaluating ten buildings that were commissioned at building start-up at least two years ago. The researchers examined the commissioning reports, control algorithms, EMCS point measurements, and energy use data, and conducted operator and commissioning provider interviews to investigate the persistence of commissioning benefits. In addition, they conducted site visits in a sample of the buildings. A set of commissioning measures was selected for each building to compare the persistence of benefits. Persistence was measured both qualitatively through a discussion of occupant comfort and decreased maintenance and quantitatively through estimations of energy savings. This paper reports the results of the study. The discussion includes how well the benefits of commissioning persisted over time, reasons for declining performance, and methods for improving persistence. The results provide valuable insight into how to estimate the persistence of commissioning information central to the cost benefit analyses routinely performed for commissioning measures.

  16. Commissioning Experience of SNS

    SciTech Connect

    Plum, Michael A

    2007-07-01

    The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H{sup -} front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs in January-February and April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including emittance evolution, transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS linac will be presented.

  17. Commission 42: Close Binaries

    NASA Astrophysics Data System (ADS)

    Giménez, Alvaro; Rucinski, Slavek; Szkody, P.; Gies, D.; Kang, Y.-W.; Linsky, J.; Livio, M.; Morrell, N.; Hilditch, R.; Nordström, B.; Ribas, I.; Sion, E.; Vrielman, S.

    2007-03-01

    The triennial report from Commission 42 covers various topics like massive binaries, contact systems, cataclysmic variables and low-mass binary stars. We try in a number of sections to provide an update on the current status of the main research areas in the field of close binaries. It is not a formal review, even complete or comprehensive, but an attempt to bring the main topics on recent research to astronomers working in other fields. References are also not comprehensive and simply added to the text to help the reader looking for deeper information on the subject. For this reason, we have chosen to include references (sometimes incomplete for ongoing work) not in a list at the end but integrated with the main text body. Complete references and additional sources can be easily obtained through web access of ADS or SIMBAD. Furthermore, the summary of papers on close-binary research contained in the Bibliography of Close Binaries (BCB) can be accessed from the web site of Commission 42. I would like to express the gratitude of the commission for the careful work of Colin Scarfe as Editor-in-Chief of BCB and Andras Holl and Attila Sragli for maintaining the web pages of the Commission within the structure of Division V. Finally, K. Olah and J. Jurcsik are gratefully acknowledged for their continued support as editors of the Information Bulletin on Variable Stars (IBVS), also accessible through the commission web page.

  18. Commissioning of CEBAF

    SciTech Connect

    Andrew Hutton

    1994-06-01

    Construction of the CEBAF accelerator, a 4 GeV CW recirculating linac, is virtually complete. The 338 power sources and superconducting RF cavities, which have all run above nominal operating gradient in vertical tests (average 10.7 MeV/m), are installed. All the major components of the nine recirculation arcs are installed and aligned. Pre-commissioning was performed in parallel with construction. Ninety-nine superconducting cavities were operated simultaneously at the nominal gradient of 5 MeV/m. A maximum beam current of 110 PA CW (ZOO PA design) was reached. A cryomodule with eight cavities has operated at 8 MeV/m. Commissioning of the entire machine began in May 94. Results obtained during commissioning of the two linacs and the first arc are presented. 600 MeV beam is ready to be brought to the first experimental hall meeting a DOE milestone established in 1988.

  19. 76 FR 79670 - Historic Harrisville, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Historic Harrisville, Inc.; Notice of Application Tendered for Filing With...: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington,...

  20. ATF2 Commissioning

    SciTech Connect

    Seryi, A.; Christian, G.; Parker, B.; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; Wolski, A.; Elsen, E.; Sanuki, T.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; Takahashi, T.; Bai, S.; Gao, J.; Bolzon, B.; Geffroy, N.; Jeremie, A.; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  1. Activities with Argentina. Spring 1999. A U.S. Department of Energy Cooperative Program with the National Atomic Energy Commission of the Argentine Republic

    SciTech Connect

    1999-06-01

    In 1989, the US Department of Energy (DOE) responded to the need to redirect resources from weapons production to environmental restoration and waste management by establishing the Office of Environmental Management (EM) and delegated to this office the responsibility of cleaning up the US nuclear weapons complex. Now in its eight year, EM`s mission has three central facets: (1) to assess, remediate, and monitor contaminated sites and facilities; (2) to store, treat, and dispose of waste from past and current operations; and (3) to develop and implement innovative technologies for environmental cleanup. To this end, EM has established domestic and international cooperative technology development programs, including one with the Republic of Argentina. Cooperating with Argentine scientific institutes and industries meets US cleanup objectives by: (1) identifying and accessing Argentine EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) fostering the development of innovative environmental technologies by increasing US private sector opportunities in Argentina in EM-related areas.

  2. 77 FR 791 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... Interconnection, L.L.C. For more information, contact Jonathan Fernandez, Office of Energy Market Regulation... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance December 29, 2011. The Federal...

  3. U.S. Nuclear Regulatory Commission Review of U.S. Department of Energy Non-High Level Waste Determination for Idaho National Laboratory Tank Farm Facility

    SciTech Connect

    Barr, C.S.; Yin, X.; Camper, L.W.; Whited, A.R.; Dinwiddie, C.L.; Howard, L.D.; Pabalan, R.T.; Pickett, D.

    2007-07-01

    The National Defense Authorization Act for Fiscal Year 2005 (NDAA) authorized the United States Department of Energy (DOE) to determine whether certain radioactive waste related to the reprocessing of spent nuclear fuel is not high-level-waste (HLW). The NDAA applies to DOE facilities in the States of South Carolina and Idaho. DOE must consult with the United States Nuclear Regulatory Commission (NRC) as part of its waste determination. NRC must coordinate with the affected state to monitor DOE's disposal actions to assess compliance with 10 CFR 61, Subpart C, performance objectives. The performance objectives in 10 CFR Part 61, Subpart C, contain requirements for protection of the public, inadvertent intruders, individuals during operations, and stability of the disposal site after closure. In September 2005, DOE submitted to NRC a draft non-HLW determination for waste incidental to reprocessing, including sodium-bearing waste [note: Sodium-bearing waste is a generic term used to describe radioactive wastes comprised of second- and third-cycle extraction fluid and decontamination fluids. This waste contains less activity and generally poses less risk than first-cycle extraction fluid (first-cycle extraction fluid contains most of the fission products)] (SBW) stored in the Idaho Nuclear Technology and Engineering Center tank farm facility (INTEC TFF) at the Idaho National Laboratory (INL). DOE plans to grout the underground tanks and concrete vaults that house these tanks to stabilize the waste in situ. DOE prepared a waste determination to demonstrate compliance with NDAA criteria, including a supporting performance assessment to demonstrate compliance with the performance objectives. To carry out its consultative role required by the NDAA, NRC uses a risk-informed, performance-based approach in its review of DOE waste determinations and performance assessments to focus on the key natural and engineered system features needed to support its compliance

  4. SPEAR 3 Commissioning Software

    SciTech Connect

    Corbett, W.J.; Portmann, G.J.; Safranek, J.A.; Terebilo, A.; /SLAC, SSRL

    2005-05-09

    The short SPEAR 3 startup time required precommissioned software for machine setup, beam measurements and data analysis. To accomplish this goal, we used Matlab with the Accelerator Toolbox (AT), the Channel Access Toolbox (MCA) and Middle Layer software to integrate code and streamline production. This paper outlines the software architecture, describes the Middle Layer component and provides examples from SPEAR 3 commissioning.

  5. Conservation Commissions in Massachusetts.

    ERIC Educational Resources Information Center

    Scheffey, Andrew J. W.

    The Conservation Foundation reported on the experience of a resource development specialist in the state of Massachusetts on the public's growing concern for environmental quality. After tracing the origins of the Massachusetts movement, the report draws upon a variety of specific state experiences to illustrate the commission's growing pains and…

  6. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  7. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  8. Nuclear Regulatory Commission Issuances

    SciTech Connect

    Not Available

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  9. 77 FR 28420 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... the notice for such hearing, which was published in 77 FR 23319, April 18, 2012. Authority: Pub. L. 91... COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on June 7, 2012, in Binghamton,...

  10. 78 FR 52601 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... on August 15, 2013, and identified in the notice for such hearing, which was published in 78 FR 43961... COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on September 19, 2013, in...