  1. Failure Forewarning in NPP Equipment NERI2000-109 Final Project Report

    SciTech Connect

    Hively, LM

    2004-03-26

    The objective of this project is forewarning of machine failures in critical equipment at next-generation nuclear power plants (NPP). Test data were provided by two collaborating institutions: Duke Engineering and Services (first project year), and the Pennsylvania State University (Applied Research Laboratory) during the second and third project years. New nonlinear methods were developed and applied successfully to extract forewarning trends from process-indicative, time-serial data for timely, condition-based maintenance. Anticipation of failures in critical equipment at next-generation NPP will improve the scheduling of maintenance activities to minimize safety concerns, unscheduled non-productive downtime, and collateral damage due to unexpected failures. This approach provides significant economic benefit, and is expected to improve public acceptance of nuclear power. The approach is a multi-tiered, model-independent, and data-driven analysis that uses ORNL's novel nonlinear method to extract forewarning of machine failures from appropriate data. The first tier of the analysis provides a robust choice for the process-indicative data. The second tier rejects data of inadequate quality. The third tier removes signal artifacts that would otherwise confound the analysis, while retaining the relevant nonlinear dynamics. The fourth tier converts the artifact-filtered time-serial data into a geometric representation, that is then transformed to a discrete distribution function (DF). This method allows for noisy, finite-length datasets. The fifth tier obtains dissimilarity measures (DM) between the nominal-state DF and subsequent test-state DFs. Forewarning of a machine failure is indicated by several successive occurrences of the DM above a threshold, or by a statistically significant trend in the DM. This paradigm yields robust nonlinear signatures of degradation and its progression, allowing earlier and more accurate detection of the machine failure.

  2. Annual Report for NERI Proposal No.2000-0109 on Forewarning of Failure in Critical Equipment at Next-Generation Nuclear Power Plants

    SciTech Connect

    Hively, LM

    2001-10-10

    This annual report describes the first year's accomplishments under the NERI2000-109 project. We present a model-independent approach to quantify changes in the nonlinear dynamics underlying time-serial data. From time-windowed data sets, we construct discrete distribution functions on the phase space. Condition change between base case and test case distribution functions is assessed by dissimilarity measures via L{sub 1}-distance and {chi}{sup 2} statistic. The discriminating power of these measures is first tested on noiseless model data, and then applied for detecting dynamical change in power from a motor-pump system. We compare the phase-space dissimilarities with traditional linear and nonlinear measures used in the analysis of chaotic systems. We also assess the potential usefulness of the new measures for robust, accurate, and timely forewarning of equipment failure.

  3. Process Equipment Cost Estimation, Final Report

    SciTech Connect

    H.P. Loh; Jennifer Lyons; Charles W. White, III

    2002-01-01

    This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

  4. Computer-aided test equipment graphics system (CATEGS). Final report

    SciTech Connect

    Fuller, W.

    1993-09-01

    This development effort evaluated existing CAD and emerging CAE technologies for implementing automated processes applicable to the design, documentation, fabrication, and maintenance of electrical test equipment. By developing designs in an electronic media and electronically moving those designs, a 2-to-1 productivity improvement was achieved over previous methods. Users and customers further identified value-added benefits of faster development of designs and improved quality of the definitions produced.

  5. Medicare program; payment for durable medical equipment and orthotic and prosthetic devices--HCFA. Final rule.

    PubMed

    1995-07-10

    This final rule addresses comments received on an interim final rule with comment period published on December 7, 1992. The interim final rule implemented section 4062(b) of the Omnibus Budget Reconciliation Act of 1987. It specified that payment under the Medicare program for durable medical equipment (DME), prosthetics, and orthotics furnished on or after January 1, 1989 is limited to the lower of the actual charge for the equipment or the fee schedule amount established by the carrier. This final rule describes amendments to the methods for computing fee schedules covering the six classes of DME and how they are updated in subsequent years in accordance with sections 13542 through 13546 of the Omnibus Budget Reconciliation Act of 1993. PMID:10172375

  6. Equipment

    NASA Astrophysics Data System (ADS)

    Szumski, Michał

    This chapter describes the most important features of capillary electrophoretic equipment. A presentation of the important developments in high voltage power supplies for chip CE is followed by preparation of fused silica capillaries for use in CE. Detection systems that are used in capillary electrophoresis are widely described. Here, UV-Vis absorbance measurements are discussed including different types of detection cells—also those less popular (u-shaped, Z-shaped, mirror-coated). Fluorescence detection and laser-induced fluorescence detection are the most sensitive detection systems. Several LIF setups, such as collinear, orthogonal, confocal, and sheath-flow cuvette, are presented from the point of view of the sensitivity they can provide. Several electrochemical detectors for CE, such as conductivity, amperometric, and potentiometric, are also shown and their constructions discussed. CE-MS and much less known CE (CEC)-NMR systems are also described. The examples of automation and robotized CE systems together with their potential fields of application are also presented.

  7. Medicare Program; Prior Authorization Process for Certain Durable Medical Equipment, Prosthetics, Orthotics, and Supplies. Final rule.

    PubMed

    2015-12-30

    This final rule establishes a prior authorization program for certain durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) items that are frequently subject to unnecessary utilization. This rule defines unnecessary utilization and creates a new requirement that claims for certain DMEPOS items must have an associated provisional affirmed prior authorization decision as a condition of payment. This rule also adds the review contractor's decision regarding prior authorization of coverage of DMEPOS items to the list of actions that are not initial determinations and therefore not appealable. PMID:26717582

  8. Marketing of coal mining equipment. Evaluation of present techniques: suggestions to aid commercialization. Final report

    SciTech Connect

    1980-09-19

    This report is an examination of the equipment preferences and decision-making methodology of the coal industry. The prime purpose is to indicate directions in which equipment research might proceed and also to indicate methods by which investment in new, more productive mining equipment could be encouraged. In addition to this, an investigation of the research and development decisions of major mining equipment manufacturers was conducted. The findings can best be condensed into three categories: needs for equipment in underground mining, needs for equipment in surface mining, and the purchase decision by coal mine operators.

  9. Methodology to estimate nonroad equipment populations by nonattainment areas. Final report

    SciTech Connect

    Not Available

    1991-09-30

    The Clean Air Act Amendments of 1990 require that EPA conduct a study to determine the contribution of nonroad equipment to the emission inventories of selected nonattainment areas. The contribution is determined by the population of nonroad equipment in a given area, the average load factor at which the equipment's engine is used, the average annual hours of use of the equipment, the horsepower of the engine, and the emission factor attributable to the engine. Since a nonattainment area is a conglomeration of counties within a state, or across states, it is necessary to estimate the county level equipment populations. Engine sales data or equipment population data, however, are not available at the county level, but only at the national and state level. Therefore, a methodology that distributes equipment populations from these levels of aggregation to the county level must be developed. The report presents EEA's methodology to estimate equipment populations for the 24 nonattainment areas included in EPA's study. The report also presents national data on load factors, annual usage, and horsepower.

  10. Development and Evaluation of Educational Programs in Biomedical Equipment Technology. Final Report.

    ERIC Educational Resources Information Center

    Technical Education Research Center, Cambridge, MA.

    The report describes the Biomedical Equipment Technology project carried out by Technical Education Research Centers between 1967 and 1974. The project developed a curriculum and a program for training biomedical equipment technicians in two-year schools. The report discusses the three phases of the project: development of pilot programs,…

  11. Medicare program; payment for durable medical equipment and orthotic, and prosthetic devices--HCFA. Interim final rule with comment period.

    PubMed

    1992-12-01

    This interim final rule implements section 4062(b) of the Omnibus Budget Reconciliation Act of 1987 which specifies that payment under the Medicare program for durable medical equipment, orthotics, and prosthetics furnished on or after January 1, 1989 is limited to the lower of the actual charge for the equipment or the fee schedule established by the carrier. We are setting forth the methods for computing fee schedules for six classes of these items. We are also describing how the fee schedules are updated in subsequent years. PMID:10171317

  12. Performance of industrial-type engines in military equipment using synthetic crankcase oils. Final report

    SciTech Connect

    Austin, G.H.; Bowen, T.; Cheek, L.; Zanedis, B.

    1981-06-01

    The investigation was to determine the possibility of eliminating crankcase oil changes in engines used in military equipment. Based on the results, it appears that an extended oil change interval can be used which would result in significant savings.

  13. Qualification of active mechanical equipment for nuclear plants. Final report. [PWR; BWR

    SciTech Connect

    Mollerus, F.J.; Allen, R.D.; Gilcrest, J.D.; Rowland, M.C.

    1985-03-01

    This report describes a methodology which can be used for qualifying active mechanical equipment for safety-related service in nuclear power plants in a cost effective manner. The emphasis in this report is to develop guidance on technically sound methods that may be used to qualify mechanical equipment without resorting to piece-by-piece testing. This report identifies the types of mechanical equipment which may need to be qualified and discusses the considerations which are important in the determination of qualification loading conditions. In particular, the traditional practice of seismic qualification of all safety related equipment is reviewed to provide a well-founded technical basis for decoupling environmental loads from seismic (and dynamic) loads. Detailed examination of design, function and potential failure modes of valves, pumps, diesel engines, drive turbines, fans and snubbers provides the technical foundation for the appropriate qualification methods to be used for environmental, seismic and dynamic qualification. These appropriate qualification methods include: design, operating and earthquake experience; analysis and testing; evaluation of the effects of radiation on non-metallic parts, consideration of thermal and wear aging; surveillance and maintenance; and proper documentation.

  14. The Role of Prior Knowledge in Operating Equipment from Written Instructions. Final Report.

    ERIC Educational Resources Information Center

    Kieras, David E.

    A series of experiments investigated the role of prior knowledge in tasks involving the operation of equipment from written instructions. The experiments covered two situations. In the first, the prior knowledge was already possessed by the subjects before the experiments. The studies involved comprehension and memory of technical prose, expertise…

  15. Final Technical Report for project entitled "Equipment Request for the Belleville Agricultural Research and Education Center"

    SciTech Connect

    Young, Bryan; Nehring, Jarrett; Susan Graham, Brian Klubek

    2013-01-16

    Executive Summary The funding provided by the DOE for this project was used exclusively to purchase research equipment involved with the field development and evaluation of crop production technologies and practices for energy crop production. The new equipment has been placed into service on the SIU farms and has significantly enhanced our research capacity and scope for agronomy and precision ag research to support novel seed traits or crop management strategies for improving the efficiency and productivity of corn and soybeans. More specifically, the precision ag capability of the equipment that was purchased has heightened interest by faculty and associated industry partners to develop collaborative projects. In addition, this equipment has provided SIU with a foundation to be more successful at securing competitive grants in energy crop production and precision ag data management. Furthermore, the enhanced capacity for agronomy research in the southern Illinois region has been realized and will benefit crop producers in this region by learning to improve their operations from our research outcomes.

  16. ST. LOUIS DEMONSTRATION FINAL REPORT: POWER PLANT EQUIPMENT, FACILITIES AND ENVIRONMENTAL EVALUATIONS

    EPA Science Inventory

    This report describes the results of the evaluation of the equipment and facilities for the firing of refuse-derived fuel and the assessment of the gaseous aqueous, and solid waste discharges associated with firing refuse-derived fuel during the St. Louis-Union Electric Refuse Fu...

  17. Space shuttle EVA/IVA support equipment requirements study. Volume 1: Final summary report

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A study was conducted to determine the support equipment requirements for space shuttle intravehicular and extravehicular activities. The subjects investigated are; (1) EVA/IVA task identification and analysis,. (2) primary life support system, (3) emergency life support system, (4) pressure suit assembly, (5) restraints, (6) work site provision, (7) emergency internal vehicular emergencies, and (8) vehicular interfaces.

  18. Guidelines for sound power level measurements for compressor station equipment. Final report

    SciTech Connect

    Crocker, M.J.; Raju, P.K.; Yang, S.B.

    1994-12-01

    These guidelines describe a method for in-situ determination of the sound power level of the noise sources in indoor or outdoor environments for gas compressor station equipment using sound intensity measurements. The guidelines contain information on instrumentation, installation and operation of the source, procedures for the selection of a measurement surface, procedures for the sampling of sound intensity on the measurement surface, procedures for the calculation of sound power level, and techniques that can be used to qualify the measurement environment. Typical results obtained for different types of equipment in a gas compressor station using these guidelines are summarized. Appendix A gives procedures to calculate A-weighted sound power level from octave or one-third octave band sound power levels. Appendix B gives descriptions about data quality indicators which are useful in making validity judgments for the sound power measurements. Appendix C describes sound power measurements using the sound pressure method. Appendix D describes sound power measurements at low frequency. Appendix E gives descriptions about sound power measurements on exhaust stacks with air flow. The Addendum to this report includes examples of the application of the guideline document to real field sound power measurements and examples of calculations of data quality indicators. It serves as a convenient and quick reference document with procedures and examples which are easy to follow in real field sound power measurement problems. Readers of the Addendum are assumed to be familiar with the detailed descriptions of the sound power measurement procedures contained in the main guideline document.

  19. Characterization of exhaust emissions from trap-equipped light-duty diesels. Final report

    SciTech Connect

    Smith, L.R.

    1989-01-01

    The objective of the project was to thoroughly characterize and quantify the criteria and toxic-pollutant emissions from two different types of trap-equipped light-duty diesel vehicles. These vehicles included a 1986 Mercedes-Benz 300 SDL, which utilizes a catalyzed trap system, and a prototype Volkswagen, which utilizes an additive trap system (organometallic iron additive). Exhaust emissions from the two vehicles were evaluated as to driving cycle, presence of traps, engine condition, trap condition and fuel aromatic content. In addition to the currently regulated emissions (HC, CO, NOx and particulate matter), a number of unregulated emissions were measured, including aldehydes, benzene, PAHs, metals and trace elements, and 1,3-butadiene. Particulate samples were also analyzed for mutagenic activity using the Ames test. In general, the vehicles produced lower hydrocarbon emissions, higher carbon monoxide emissions, and lower fuel economy when the traps were installed in the vehicles.

  20. Oxidation of volatiles in residential wood burning equipment. Final technical report, September 1980-February 1984

    SciTech Connect

    Malte, P.C.; Thornton, M.M.; Kamber, P.D.

    1984-04-01

    The objectives of this project are to measure, through the use of laboratory combustors, those conditions which promote complete combustion of wood volatiles in residential wood burning equipment. The conditions of interest are combustion temperature, residence time, stoichiometry, and air mixing. The project objectives are met through two laboratory approaches: (1) model compound studies: in order to measure the overall rates of oxidative pyrolysis of biomass volatiles, and to determine the types of intermediate organic species which are likely to form as part of this process, model compounds have been reacted in a specialized jet-stirred reactor, which has been developed as part of this research. (2) high-intensity wood combustion: in order to study the clean combustion of wood, that is, to investigate the conceptual design features required for clean burning, and to ascertain the levels and types of pollutant and condensible species which are most difficult to oxidize, a high-intensity, research wood combustor has been developed and examined for the different phases of the wood burning cycle. Although the objectives of the project have been met, it has not been possible, because of support limitations, to thoroughly explore several interesting aspects which have arisen because of this research. For example, a third laboratory system in which wood pyrolysis gas is injected directly into the a well characterized reactor, so that the kinetics and mechanisms of the gas-phase reaction of the actual biomass volatiles can be studied, could not be thoroughly developed. Refinements in the high-intensity wood combustor, which would bring its design features closer to practicality for the industry, could not be considered. 32 references, 37 figures, 10 tables.

  1. Automobile or Other Conveyance and Adaptive Equipment Certificate of Eligibility for Veterans or Members of the Armed Forces With Amyotrophic Lateral Sclerosis Connected to Military Service. Final rule.

    PubMed

    2016-01-13

    The Department of Veterans Affairs (VA) published an Interim Final Rule on February 25, 2015, to amend its adjudication regulations to provide a certificate of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment for all veterans with service-connected amyotrophic lateral sclerosis (ALS) and servicemembers serving on active duty with ALS. The amendment authorized automatic issuance of a certificate of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment to all veterans with service-connected ALS and members of the Armed Forces serving on active duty with ALS. The intent of this final rule is to confirm the amendment made by the interim final rule without change. PMID:26761955

  2. Learning about Equipment from Technical Documentation: A Basic Comprehensible Writing Aid. Final Report. Technical Report No. 31.

    ERIC Educational Resources Information Center

    Kieras, David E.

    Theoretical and empirical work was conducted on the role of the "mental model," or how-it-works information, in learning to operate equipment. The original project was concerned with empirical and cognitive modeling studies of how people learn to operate equipment from the kind of information contained in technical documentation. The goal was to…

  3. A Statewide Study Designed to Determine Methods of Reducing Injury in Interscholastic Football Competition by Equipment Modification. Final Report.

    ERIC Educational Resources Information Center

    Callahan, William T.; And Others

    Through an examination of data on injuries to the lower extremities of varsity high school players, this study sought to ascertain 1) whether modified cleats brought about a reduction in the number and/or severity of such injuries; and 2) whether there existed an optimum combination of equipment for reduction in the number and/or severity of such…

  4. Blade Testing Equipment Development and Commercialization: Cooperative Research and Development Final Report, CRADA Number CRD-09-346

    SciTech Connect

    Snowberg, D.; Hughes, S.

    2013-04-01

    Blade testing is required to meet wind turbine design standards, reduce machine cost, and reduce the technical and financial risk of deploying mass-produced wind turbine models. NREL?s National Wind Technology Center (NWTC) in Colorado is the only blade test facility in the U.S. capable of performing full-scale static and fatigue testing of multi-megawatt-scale wind turbine blades. Rapid growth in wind turbine size over the past two decades has outstripped the size capacity of the NWTC blade test facility leaving the U.S. wind industry without a suitable means of testing blades for large land-based and offshore turbines. This CRADA will develop and commercialize testing technologies and test equipment, including scaling up, value engineering, and testing of equipment to be used at blade testing facilities in the U.S. and around the world.

  5. Face haulage equipment failure analysis. Volume I. Technical information and conclusions. Final technical report as of November 30, 1980

    SciTech Connect

    Patterson, W.N.; Orona, F.

    1980-11-01

    Face haulage equipment used in conjunction with continuous miners (shuttle cars, diesel haulers, battery scoops, and bridge conveyors) was investigated by recording section delay reports for computer analysis to determine the effect of haulage equipment failures and downtime on productivity, pinpoint the causes of machine failures and downtime, and develop the possible design and operational changes required to reduce machine failures and downtime and increase section productivity. For the mobile vehicle type of haulage (shuttle car, diesel hauler, and battery scoop) failure of one unit in multiple unit haulage operations would not normally stop section production. Bridge conveyors as a haulage system provide continuous haulage of section production but when any part of the bridge system fails, the section production is stopped. In the course of this program, it was determined through the use of daily section shift reports on 200 machines that face haulage equipment is responsible for about 40 to 56 minutes of lost section production time per shift. The most prevalent failure for shuttle cars was found to be the trailing cable umbilical. Bridge conveyors had the most trouble with the conveyor subsystem. Discussions of these and other recorded failures are developed with possible solutions outlined for future implementation. This report only covers the face haulage element of the continuous miner system. Companion reports were developed for the continuous miner and roof bolter elements under separate task orders.

  6. Application guide for waste heat recovery with organic Rankine cycle equipment. Final report May-Dec 82

    SciTech Connect

    Moynihan, P.I.

    1983-01-15

    This report assesses the state-of-the-art of commercially available organic Rankine cycle (ORC) hardware from a literature search and industry survey. Engineering criteria for applying ORC technology are established, and a set of nomograms to enable the rapid sizing of the equipment is presented. A comparison of an ORC system with conventional heat recovery techniques can be made with a nomogram developed for a recuperative heat exchanger. A graphical technique for evaluating the economic aspects of an ORC system and conventional heat recovery method is discussed; also included is a description of anticipated future trends in organic Rankine cycle RandD.

  7. Medicare program; revisions to the durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) supplier safeguards. Final rule.

    PubMed

    2012-03-14

    This final rule removes the definition of "direct solicitation'' and allows DMEPOS suppliers, including DMEPOS competitive bidding program contract suppliers, to contract with licensed agents to provide DMEPOS supplies, unless prohibited by State law. It also removes the requirement for compliance with local zoning laws and modifies certain State licensure requirement exceptions. PMID:22420064

  8. Improved equipment cleaning in coated and laminated substrate manufacturing facilities (phase 2). Final report, November 1992-November 1993

    SciTech Connect

    Vitas, J.B.; McMinn, B.W.; McMinn, G.D.

    1995-07-01

    The report discusses EPA efforts to identify, demonstrate, and publish pollution prevention information and opportunites for equipment cleaning for the coated and laminated substrate manufacturing industry. It summarizes initial data collected and summarized during industry observation and demonstration visits. Demonstration took place at a small batch facility and a small dedicated-line facility. The focus at the batch facility was to decrease the number of solvents used for cleaning, reducing the quantity of material used for cleaning, and standardizing cleaning practices. While consolidating from three chemicals (toluene, xylene, and methyl ethyl ketone) to a single solvent for cleaning may not be feasible because of the varied product mix, the facility could eliminate one solvent, thereby reducing handling and disposal costs.

  9. Solar Resources Measurements in Houston, TX -- Equipment Only: Cooperative Research and Development Final Report, CRADA Number CRD-06-204

    SciTech Connect

    Stoffel, T.

    2012-09-01

    Loaning Texas Southern University equipment in order to perform site-specific, long-term, continuous, and high-resolution measurements of solar irradiance is important for developing renewable resource data. These data are used for several research and development activities consistent with the NREL mission: (1) establish a national 30-year climatological database of measured solar irradiances; (2) provide high quality ground-truth data for satellite remote sensing validation; (3) support development of radiative transfer models for estimating solar irradiance from available meteorological observations; (4) provide solar resource information needed for technology deployment and operations. Data acquired under this agreement will be available to the public through NREL's Measurement & Instrumentation Data Center - MIDC (http://www.nrel.gov/midc) Or the Renewable Resource Data Center - RReDC (http://rredc.nrel.gov). The MIDC offers a variety of standard data display, access, and analysis tools designed to address the needs of a wide user audience (e.g., industry, academia, and government interests).

  10. Field Demonstration of Active Desiccant Modules Designed to Integrate with Standard Unitary Rooftop Package Equipment - Final Report: Phase 3

    SciTech Connect

    Fischer, J

    2004-03-15

    This report summarizes the investigation of two active desiccant module (ADM) pilot site installations initiated in 2001. Both pilot installations were retrofits at existing facilities served by conventional heating, ventilating, and air-conditioning (HVAC) systems that had encountered frequent humidity control, indoor air quality (IAQ), and other operational problems. Each installation involved combining a SEMCO, Inc., ADM (as described in Fischer and Sand 2002) with a standard packaged rooftop unit built by the Trane Company. A direct digital control (DDC) system integral to the ADM performed the dual function of controlling the ADM/rooftop combination and facilitating data collection, trending, and remote performance monitoring. The first installation involved providing preconditioned outdoor air to replace air exhausted from the large kitchen hood and bathrooms of a Hooters restaurant located in Rome, Georgia. This facility had previously added an additional rooftop unit in an attempt to achieve occupant comfort without success. The second involved conditioning the outdoor air delivered to each room of a wing of the Mountain Creek Inn at the Callaway Gardens resort. This hotel, designed in the ''motor lodge'' format with each room opening to the outdoors, is located in southwest Georgia. Controlling the space humidity always presented a serious challenge. Uncomfortable conditions and musty odors had caused many guests to request to move to other areas within the resort. This is the first field demonstration performed by Oak Ridge National Laboratory where significant energy savings, operating cost savings, and dramatically improved indoor environmental conditions can all be claimed as the results of a retrofit desiccant equipment field installation. The ADM/rooftop combination installed at the restaurant resulted in a reduction of about 34% in the electricity used by the building's air-conditioning system. This represents a reduction of approximately 15% in

  11. Medicare program; End-Stage Renal Disease prospective payment system, quality incentive program, and Durable Medical Equipment, Prosthetics, Orthotics, and Supplies. Final rule.

    PubMed

    2014-11-01

    This final rule will update and make revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2015. This rule also finalizes requirements for the ESRD quality incentive program (QIP), including for payment years (PYs) 2017 and 2018. This rule will also make a technical correction to remove outdated terms and definitions. In addition, this final rule sets forth the methodology for adjusting Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) fee schedule payment amounts using information from the Medicare DMEPOS Competitive Bidding Program (CBP); makes alternative payment rules for certain DME under the Medicare DMEPOS CBP; clarifies the statutory Medicare hearing aid coverage exclusion and specifies devices not subject to the hearing aid exclusion; will not update the definition of minimal self-adjustment; clarifies the Change of Ownership (CHOW) and provides for an exception to the current requirements; revises the appeal provisions for termination of a CBP contract, including the beneficiary notification requirement under the Medicare DMEPOS CBP, and makes a technical change to the regulation related to the conditions for awarding contracts for furnishing infusion drugs under the Medicare DMEPOS CBP. PMID:25376058

  12. Study of the effects of accidentally released carbon/graphite fibers on electric power equipment. Program final report, June 5, 1978-June 5, 1980

    SciTech Connect

    Mauser, S.F.; Bankoske, J.W.; Cooper, J.H.; Davies, D.G.; Eichler, C.H.; Hileman, A.R.; Mousseau, T.E. Jr.; Rackliffe, G.B.

    1980-06-05

    The program to study the effect of accidentally released carbon fibers on electrical power equipment consisted of determining the vulnerability of system outage rates to carbon fiber contamination, and performing tests to quantitize the contamination required to cause flashover of external insulation. Part One of this final report describes an assessment of the vulnerability of power systems to accidentally released fibers from a composite burn. The assessment describes the effect of carbon fibers on individual component failure rates and discusses the effect the change in component failure rates has on the power system reliability. Part Two describes in detail testing performed to determine the vulnerability of external insulation to carbon fiber contamination. Testing consisted of airborne contamination tests on distribution insulators, limited tests on suspension insulators which are commonly used for transmission class voltages, and various tests to quantify the influence of fiber length, voltage stress, etc. on flashover characteristics. The data obtained and analysis performed during this project show that the change of system reliability due to an accidental release from burned carbon fiber composite is negligible.

  13. STDN ranging equipment

    NASA Technical Reports Server (NTRS)

    Jones, C. E.

    1975-01-01

    Final results of the Spaceflight Tracking and Data Network (STDN) Ranging Equipment program are summarized. Basic design concepts and final design approaches are described. Theoretical analyses which define requirements and support the design approaches are presented. Design verification criteria are delineated and verification test results are specified.

  14. ENVIRONMENTAL TECHNOLOGY VERIFICATION COATINGS AND COATING EQUIPMENT PROGRAM (ETV CCEP), FINAL TECHNOLOGY APPLICATIONS GROUP TAGNITE--TESTING AND QUALITY ASSURANCE PLAN (T/QAP)

    EPA Science Inventory

    The overall objective of the Environmental Testing and Verification Coatings and Coating Equipment Program is to verify pollution prevention and performance characteristics of coating technologies and make the results of the testing available to prospective coating technology use...

  15. Biodiesel Emissions Testing with a Modern Diesel Engine - Equipment Only: Cooperative Research and Development Final Report, CRADA Number CRD-10-399

    SciTech Connect

    Williams, A.

    2013-06-01

    To evaluate the emissions and performance impact of biodiesel in a modern diesel engine equipped with a diesel particulate filter. This testing is in support of the Non-Petroleum Based Fuels (NPBF) 2010 Annual Operating Plan (AOP).

  16. Equipment Only - Solar Resources Measurements at the University of Texas at Austin, TX: Cooperative Research and Development Final Report, CRADA Number CRD-07-222

    SciTech Connect

    Stoffel, T.

    2013-01-01

    Faculty and staff at the University of Texas at Austin collected solar resource measurements at their campus using equipment on loan from the National Renewable Energy Laboratory. The equipment was used to train students on the operation and maintenance of solar radiometers and was returned to NREL's Solar Radiation Research Laboratory upon completion of the CRADA. The resulting data augment the solar resource climatology information required for solar resource characterizations in the U.S. The cooperative agreement was also consistent with NREL's goal of developing an educated workforce to advance renewable energy technologies.

  17. Systematic Model for Validating Equipment Uses in Selected Marketing and Distribution Education Programs. Final Report, February 1, 1980-June 30, 1981.

    ERIC Educational Resources Information Center

    Gildan, Kate; Buckner, Leroy

    Research was conducted to provide a model for selecting equipment for marketing and distributive education programs that was required for the development of the skills or competencies needed to perform in marketing and distribution occupation. A research of the literature identified both competency statements for three program areas--Fashion…

  18. Comparative Occupational Survey of Civilian and Military Members in the Pavements Maintenance and Construction Equipment Operator Specialties. Final Report for Period 1 October 1975-30 October 1977.

    ERIC Educational Resources Information Center

    Cowan, Douglas K.

    A study was conducted to analyze and compare the job performance of civil service and military pavements maintenance workers and construction equipment operators. A military sample of 2,675 and a civilian sample of 1,974 were surveyed by means of a job inventory checklist and relative time spent rating method. Of the three job types that were…

  19. Recycling of engineering plastics from waste electrical and electronic equipments: influence of virgin polycarbonate and impact modifier on the final performance of blends.

    PubMed

    Ramesh, V; Biswal, Manoranjan; Mohanty, Smita; Nayak, Sanjay K

    2014-05-01

    This study is focused on the recovery and recycling of plastics waste, primarily polycarbonate, poly(acrylonitrile-butadiene-styrene) and high impact polystyrene, from end-of-life waste electrical and electronic equipments. Recycling of used polycarbonate, acrylonitrile-butadiene-styrene, polycarbonate/acrylonitrile-butadiene-styrene and acrylonitrile-butadiene-styrene/high impact polystrene material was carried out using material recycling through a melt blending process. An optimized blend composition was formulated to achieve desired properties from different plastics present in the waste electrical and electronic equipments. The toughness of blended plastics was improved with the addition of 10 wt% of virgin polycarbonate and impact modifier (ethylene-acrylic ester-glycidyl methacrylate). The mechanical, thermal, dynamic-mechanical and morphological properties of recycled blend were investigated. Improved properties of blended plastics indicate better miscibility in the presence of a compatibilizer suitable for high-end application. PMID:24695435

  20. An assessment and evaluation for recycle/reuse of contaminated process and metallurgical equipment at the DOE Rocky Flats Plant Site -- Building 865. Final report

    SciTech Connect

    Not Available

    1993-08-01

    An economic analysis of the potential advantages of alternatives for recycling and reusing equipment now stored in Building 865 at the Rocky Flats Plant (RFP) in Colorado has been conducted. The inventory considered in this analysis consists primarily of metallurgical and process equipment used before January 1992, during development and production of nuclear weapons components at the site. The economic analysis consists of a thorough building inventory and cost comparisons for four equipment dispositions alternatives. The first is a baseline option of disposal at a Low Level Waste (LLW) landfill. The three alternatives investigated are metal recycling, reuse with the government sector, and release for unrestricted use. This report provides item-by-item estimates of value, disposal cost, and decontamination cost. The economic evaluation methods documented here, the simple cost comparisons presented, and the data provided as a supplement, should provide a foundation for D&D decisions for Building 865, as well as for similar D&D tasks at RFP and at other sites.

  1. VIEW OF ULTRASONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF ULTRA-SONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT NON-DESTRUCTIVELY TESTS WEAPONS COMPONENTS FOR FLAWS AND CRACKS. (9/11/85) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO

  2. Lithography equipment

    NASA Astrophysics Data System (ADS)

    Levinson, Harry J.

    1996-07-01

    Until recently, lithography capability evolved consistently with Moore's law. It appears that semiconductor manufacturers are now deviating from Moore's law, which has implications for lithography equipment. DUV lithography is moving into production in a mix-and-match environment. Step- and-scan technology is the wave of the near-future, as a way to contend with the difficulty of manufacturing wide-field lenses. Resist processing equipment will undergo few fundamental changes, but will often be integrated with steppers, particularly for DUV applications. Metrology is being stretched beyond its limits for technologies below 250 nm. The move is on to 300 m diameter wafers, and 193 nm lithography is under consideration.

  3. Solar Equipment

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A medical refrigeration and a water pump both powered by solar cells that convert sunlight directly into electricity are among the line of solar powered equipment manufactured by IUS (Independent Utility Systems) for use in areas where conventional power is not available. IUS benefited from NASA technology incorporated in the solar panel design and from assistance provided by Kerr Industrial Applications Center.

  4. Superfund Record of Decision (EPA Region 7): White Farm Equipment Company Dump site, Floyd County, Charles City, IA. (First remedial action), September 1990. Final report

    SciTech Connect

    Not Available

    1990-09-28

    The 20-acre White Farm Equipment Dump site is an active landfill near the north border of Charles City in Floyd County, Iowa. Drainage from the site toward the northwest and south feeds into adjacent wetland areas. The Charles City municipal wells, located 700 feet east of the site, obtain water from the deep, confined Cedar Valley aquifer. Additionally, six shallow drinking water wells that draw from an uncontrolled water table are 1,000 feet downgradient from the site. Intermittently since 1971, approximately 650,000 cubic yards of wet scrubber sludges, foundry sands, baghouse dusts, and other industrial wastes were disposed of onsite. The primary contaminants of concern affecting the soil, debris, and ground water are VOCs including benzene and toluene; and metals including arsenic, lead, and chromium.

  5. Rescue Equipment

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The Lifeshear cutter, a rescue tool for freeing accident victims from wreckage, was developed under the Clinton Administration's Technology Reinvestment Program. Prior cutting equipment was cumbersome and expensive; the new cutter is 50 percent lighter and 70 percent cheaper. The cutter is pyrotechnically-actuated, using a miniature version of the power cartridges used for separation devices on the Space Shuttle and other NASA spacecraft. Hi-Shear Technology Corporation developed the cutter with the Jet Propulsion Laboratory and input from the City of Torrance (California) Fire Department.

  6. Solar Resource Measurements in Cocoa, Florida (FSEC) - Equipment Loaned to NREL: Cooperative Research and Development Final Report, CRADA Number CRD-08-318

    SciTech Connect

    Stoffel, T.; Afshin, A.

    2014-01-01

    Site-specific measurements of global and diffuse solar irradiance components, passively separated by alternate shading and unshading of a pyranometer mounted under a shading band with alternating opaque and open panels (for a site other than NREL) are needed to verify the underlying theory and mathematical techniques for developing direct, global and diffuse renewable resource data from such a system. These data are used for several research and development activities consistent with the NREL mission: Establish a national 30-year climatological database of measured solar irradiances; Support development of radiative transfer models for estimating solar irradiance from available meteorological observations; Provide solar resource information needed for technology deployment and operations. NREL will provide the supporting equipment (Shadow Bank Stand) for the specially designed shading band. FSEC will provide the calibrated pyranometer and perform data acquisition of the radiometer signal. Data acquired under this agreement will be shared with the NREL Principle Investigator for the purposes of validating techniques for estimating direct radiation from global and diffuse components measured with the ZEBRA system.

  7. Twelve month follow-up report of the conference to promote international sales of US geothermal equipment (CORECT Project): Final report

    SciTech Connect

    Anderson, D.N.

    1988-12-01

    The reverse trade mission ''Conference to Promote International Sales of US Geothermal Equipment'' was organized and managed by the Geothermal Resources Council (GRC) in collaboration with the California Energy Commission (CEC). The mission was held in late September/October of 1987 and was well received by the 23 participants from 18 different countries. Approximately $275,000 in immediate sales can be attributed directly to the program and the estimate of potential future sales runs as high as $4,765,000. It was felt by the attendees that the program was well organized and executed and that the caliber of persons invited to attend was optimum. All of the attendees stated that the function was very informative and beneficial and that they would recommend to others that they attend similar functions. In order to be really effective in exporting a company, a country must be highly visible to potential purchasers. Although this function lasted only two weeks it was considered as a prime first step in the development of a strong US geothermal technology export base program. As a part of the effort to maintain this presence the GRC recommends that this function be followed by other similar functions, courses, seminars, and specific field trips. In addition every effort should be made for US government and industry representatives to visit various countries as often as possible. The GRC is working toward developing an international information-dissemination program, which would include the development of courses for geothermal units in foreign countries.

  8. Equipment Analysis

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Magnavox Government & Electronics Company originally used the NASTRAN program in the design stage of heavy aluminum fixtures for vibration testing. Program also used to compare the resonant frequencies of the circuitry to predict whether failures may occur because of high vibration levels. The company engineers can then make design alterations to improve the equipment's vibration resistance. Method allows Magnavox to insure reliability and reduce any possibility of vibration-caused failure in critical defense products they manufacture. Magnavox uses another COSMIC software package called GENOPTICS in the development of a Digital Optical Recorder, and also in research and development of other optical systems. This enables use of an optically recorded disc to store and retrieve digital data. It is reported that this program provides accurate results and that its use saved six man-months of time that would have been needed to develop a comparable software package.

  9. Medicare program; carrier jurisdiction for claims for durable medical equipment, prosthetics, orthotics and supplies (DMEPOS) and other issues involving suppliers, and criteria and standards for evaluating regional DMEPOS carriers--HCFA. Final rule with comment period.

    PubMed

    1992-06-18

    This final rule Modifies regulations to provide that claims for durable medical equipment, prosthetics, orthotics and certain other items covered under part B of Medicare be processed by designated carriers. Specifies the jurisdictions each designated carrier will serve. Changes the method by which claims for these items are allocated among the carriers from "point of sale" to "beneficiary residence." Establishes certain minimum standards for suppliers for purposes of submitting the above claims. Incorporates in regulations certain supplier disclosure requirements imposed under section 4164 of the Omnibus Budget Reconciliation Act of 1990, as part of the process for issuing and renewing a supplier's billing number. Describes the criteria and standards to be used beginning October 1, 1993 for evaluating the performance of designated carriers processing claims for durable medical equipment, prosthetics, orthotics, and supplies (DMEPOS) in the administration of the Medicare program. Section 1842(b)(2) of the Social Security Act requires us to publish criteria and standards against which we evaluate Medicare carriers for public comment in the Federal Register. We expect the above changes to lead to more efficient and economical administration of the Medicare program. PMID:10171046

  10. Aeration equipment for small depths

    NASA Astrophysics Data System (ADS)

    Sluše, Jan; Pochylý, František

    2015-05-01

    Deficit of air in water causes complications with cyanobacteria mainly in the summer months. Cyanobacteria is a bacteria that produces poison called cyanotoxin. When the concentration of cyanobacteria increases, the phenomena "algal bloom" appears, which is very toxic and may kill all the organisms. This article describes new equipment for aeration of water in dams, ponds and reservoirs with small depth. This equipment is mobile and it is able to work without any human factor because its control is provided by a GPS module. The main part of this equipment consists of a floating pump which pumps water from the surface. Another important part of this equipment is an aerator where water and air are blended. Final aeration process runs in the nozzles which provide movement of all this equipment and aeration of the water. Simulations of the flow are solved by multiphase flow with diffusion in open source program called OpenFOAM. Results will be verified by an experiment.

  11. 36 CFR 1210.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Government shall be identified to indicate Federal ownership. (3) A physical inventory of equipment shall be... the inventory, verify the existence, current utilization, and continued need for the equipment. (4) A... issue disposition instructions within 120 calendar days after receipt of a final inventory. The...

  12. Cleaning supplies and equipment

    MedlinePlus

    ... on any object the person touched or on equipment that was used during their care. Some germs ... why it is important to disinfect supplies and equipment. To disinfect something means to clean it to ...

  13. Personal protective equipment

    MedlinePlus

    ... protective equipment. Available at: www.cdc.gov/niosh/ppe . Accessed October 27, 2015. Holland MG, Cawthon D. Personal protective equipment and decontamination of adults and children. Emerg Med Clin N ...

  14. Medical Issues: Equipment

    MedlinePlus

    ... Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At School At Home ... Diagnosed Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life Grief & Loss Community & Local ...

  15. Mobile Equipment Expands Inventory.

    ERIC Educational Resources Information Center

    McGough, Robert L.; And Others

    1978-01-01

    Describes the Mobile Equipment Modules (MEM) system in Duluth, Minnesota. MEM is a way to hold down costs and increase learning opportunities by consolidating purchases of expensive shop equipment within the school district, grouping the equipment in modules, and scheduling and moving it from school to school as needed. (MF)

  16. Selecting Microform Reading Equipment.

    ERIC Educational Resources Information Center

    McIntosh, Melinda

    1983-01-01

    Cites sources of information concerning selection of microform reading equipment and provides step-by-step outline of selection process. Defining specific needs for which equipment is used, determining what equipment is being marketed, and examining and evaluating readers' design features in terms of practicability and aesthetics are discussed.…

  17. Anaesthesia equipment malfunction.

    PubMed

    Holley, H S; Carroll, J S

    1985-01-01

    Anaesthetic equipment was studied to determine whether the accuracy was improved and failure rate decreased by routine maintenance and calibration by a biomedical technician. Each piece was evaluated, and then repaired and rechecked at intervals by the same technician. Equipment failures were divided into three types: first, equipment that was completely nonfunctional; second, equipment that was functional but inaccurate; and third, equipment that was functional and accurate but needed minor repairs. The percentage of equipment failures in each group was compared on initial evaluation and after 6 months. Of the 311 pieces of equipment, 40% needed repair at the time of the initial survey; 80% was nonfunctional, and 18% was functional but inaccurate. After six months on a maintenance schedule, only 15% of the equipment needed repair, 3% was nonfunctional, and 6% was functional but inaccurate. The difference between the total percentage of equipment failure initially and after six months was statistically significant. After a regular maintenance, calibration, and checkout schedule by a biomedical technician was instituted, there was a significant improvement in the accuracy of the equipment and a reduction in the percentage of equipment needing repair. PMID:3970340

  18. Renewal of radiological equipment.

    PubMed

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  19. RETRIEVAL EQUIPMENT DESCRIPTIONS

    SciTech Connect

    J. Steinhoff

    1997-08-25

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler.

  20. Electronic Equipment Thermal Management

    NASA Astrophysics Data System (ADS)

    Berger, R. L.; Jenkins, L. C.

    An assessment is made of the importance of thermal management in electronic equipment design, illustrating the ways in which CAD technology may be used to improve electronic equipment thermal management programs. Attention is given to the Electronic Equipment Thermal Management portion of the aircraft system-level Thermal Management Control (TMC) program. TMC establishes the process by which the airframe's environmental control system and the electronic equipment are integrated to optimize system reliability through life cycle cost minimization, by allocating available cooling capacity to system elements on the basis of derived benefits.

  1. Adaptive Recreational Equipment.

    ERIC Educational Resources Information Center

    Schilling, Mary Lou, Ed.

    1983-01-01

    Designed for teachers interested in therapeutic recreation, the document lists sources of adaptive recreational equipment and their homemade counterparts. Brief descriptions for ordering or constructing recreational equipment for the visually impaired, poorly coordinated, physically impaired, and mentally retarded are given. Specific adaptations…

  2. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  3. Troubleshooting rotating equipment

    SciTech Connect

    Wong, R.F. )

    1992-10-01

    This paper reports that equipment problems in a Peruvian refinery illustrate the process engineer's role as a troubleshooter. Examples show that rotating equipment problems can stem from mechanical or process factors and involve both inspection/maintenance specialists and process engineers.

  4. Technology Equipment Rooms.

    ERIC Educational Resources Information Center

    Day, C. William

    2001-01-01

    Examines telecommunications equipment room design features that allow for growth and can accommodate numerous equipment replacements and upgrades with minimal service disruption and with minimal cost. Considerations involving the central hub, power and lighting needs, air conditioning, and fire protection are discussed. (GR)

  5. Equipment Operator 1 & C.

    ERIC Educational Resources Information Center

    Naval Education and Training Program Development Center, Pensacola, FL.

    The Rate Training Manual and Nonresident Career Course (RTM/NRCC) form a self-study package to assist Navy Equipment Operators First and Chief in fulfilling the requirements of their rating. (Navy Equipment Operators First and Chief direct and coordinate efforts of individuals and crews in construction, earthmoving, roadbuilding, quarrying, and…

  6. Equipment & New Products.

    ERIC Educational Resources Information Center

    Poitras, Adrian W., Ed.

    1977-01-01

    Presents several new products and equipment for teaching college science courses such as laser optics bench, portable digital thermometer, solar energy furnaces and blackboard optics kit. A description of all equipment or products, cost, and addresses of manufacturers are also included. (HM)

  7. Engineer Equipment Mechanic.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    Developed as part of the Marine Corps Institute (MCI) correspondence training program, this course on engineer equipment mechanics is designed to advance the professional competence of privates through sergeants as equipment mechanics, Military Occupation Specialty 1341, and is adaptable for nonmilitary instruction. Introductory materials include…

  8. Shipboard Electronic Equipments.

    ERIC Educational Resources Information Center

    Naval Personnel Program Support Activity, Washington, DC.

    Fundamentals of major electronic equipments on board ships are presented in this text prepared for naval officers in general. Basic radio principles are discussed in connection with various types of transmitters, receivers, antennas, couplers, transfer panels, remote-control units, frequency standard equipments, teletypewriters, and facsimile…

  9. Electric utility engineer`s FGD manual -- Volume 2: Major mechanical equipment; FGD proposal evaluations; Use of FGDPRISM in FGD system modification, proposal, evaluation, and design; FGD system case study. Final report

    SciTech Connect

    1996-03-04

    Part 2 of this manual provides the electric utility engineer with detailed technical information on some of the major mechanical equipment used in the FGD system. The objectives of Part 2 are the following: to provide the electric utility engineer with information on equipment that may be unfamiliar to him, including ball mills, vacuum filters, and mist eliminators; and to identify the unique technique considerations imposed by an FGD system on more familiar electric utility equipment such as fans, gas dampers, piping, valves, and pumps. Part 3 provides an overview of the recommended procedures for evaluating proposals received from FGD system vendors. The objectives are to provide procedures for evaluating the technical aspects of proposals, and to provide procedures for determining the total costs of proposals considering both initial capital costs and annual operating and maintenance costs. The primary objective of Part 4 of this manual is to provide the utility engineer who has a special interest in the capabilities of FGDPRISM [Flue Gas Desulfurization PRocess Integration and Simulation Model] with more detailed discussions of its uses, requirements, and limitations. Part 5 is a case study in using this manual in the preparation of a purchase specification and in the evaluation of proposals received from vendors. The objectives are to demonstrate how the information contained in Parts 1 and 2 can be used to improve the technical content of an FGD system purchase specification; to demonstrate how the techniques presented in Part 3 can be used to evaluate proposals received in response to the purchase specification; and to illustrate how the FGDPRISM computer program can be used to establish design parameters for the specification and evaluate vendor designs.

  10. Animal Health Equipment Management.

    PubMed

    Rethorst, David N

    2015-07-01

    Proper health equipment management requires significant attention to detail. Establishing and following protocols during processing (eg, cleaning and disinfecting equipment at the end of the work day) is required to ensure a safe product that is free of defects and residues. Overall cleanliness of equipment and facilities is important not only from a food safety standpoint but many view these as an overall indicator of attention to detail in the entire production system. Ensuring that needles are changed, implant guns are managed properly, vaccine is handled in an acceptable manner, and that proper chute operation occurs is essential. PMID:26139191

  11. Generic seismic ruggedness of power plant equipment

    SciTech Connect

    Merz, K.L. )

    1991-08-01

    This report updates the results of a program with the overall objective of demonstrating the generic seismic adequacy of as much nuclear power plant equipment as possible by means of collecting and evaluating existing seismic qualification test data. These data are then used to construct ruggedness'' spectra below which equipment in operating plants designed to earlier earthquake criteria would be generically adequate. This document is an EPRI Tier 1 Report. The report gives the methodology for the collection and evaluation of data which are used to construct a Generic Equipment Ruggedness Spectrum (GERs) for each equipment class considered. The GERS for each equipment class are included in an EPRI Tier 2 Report with the same title. Associated with each GERS are inclusion rules, cautions, and checklists for field screening of in-place equipment for GERS applicability. A GERS provides a measure of equipment seismic resistance based on available test data. As such, a GERS may also be used to judge the seismic adequacy of similar new or replacement equipment or to estimate the seismic margin of equipment re-evaluated with respect to earthquake levels greater than considered to date, resulting in fifteen finalized GERS. GERS for relays (included in the original version of this report) are now covered in a separate report (NP-7147). In addition to the presentation of GERS, the Tier 2 report addresses the applicability of GERS to equipment of older vintage, methods for estimating amplification factors for evaluating devices installed in cabinets and enclosures, and how seismic test data from related studies relate to the GERS approach. 28 refs., 5 figs., 4 tabs.

  12. Equipment & New Products.

    ERIC Educational Resources Information Center

    Poitras, Adrian W., Ed.

    1979-01-01

    Reviews new science equipment and products for the laboratory. Includes hand-held calculators, fiberglass fume hoods, motorized microtomy, disposable mouse cages, and electric timers. Describes 11 products total. Provides manufacturer name, address, and price. (MA)

  13. Selecting Library Furniture & Equipment.

    ERIC Educational Resources Information Center

    Media & Methods, 1997

    1997-01-01

    Offers suggestions for selecting school library furniture and equipment. Describes various models of computer workstations; reading tables and chairs; and shelving. Sidebar lists names and addresses of library furniture manufactures and distributors. (AEF)

  14. Selecting the right ultrasound equipment--an administrator's perspective.

    PubMed

    Jacoby, Robert

    2003-01-01

    Recent advancements in ultrasound equipment, technology and capability make the selection of new or replacement equipment a difficult task. It is not uncommon that the sonographers will have different needs and wants from the equipment than do the radiologists. This potential hurdle needs to be addressed in order to arrive at a mutually acceptable selection. Vendors across the board all have very competitive products and they each have that special little "function" or "enhancement" that sets them apart from their competitor. The customer needs to approach the evaluation of the equipment in a very objective manner in order to truly understand not only the differences of each piece of equipment but the actual capability of each piece of equipment. In the end however, it is the individual sonographer that will be utilizing the equipment most of the time and they should have the final say to department management as to which equipment is selected. PMID:12656055

  15. Tracking equipment on hire

    SciTech Connect

    Not Available

    1985-06-01

    The first comprehensive computer-based system for managing large inventories of rental equipment in the North Sea has been commissioned by British oilfield services group Expro. Now, after a year of operations in which the system has proved its worth in improving the efficiency of Expro's well testing and other services, it is being offered for sale to other oil industry companies with problems in controlling movement of capital equipment. The computer-based inventory control system to is described.

  16. 78 FR 59623 - Emergency Medical Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ...) should remain, ``no-go'' items. See 66 FR 19033. That final rule's preamble also states that the current.... SUMMARY: This action supplements the preamble published in the Federal Register on April 12, 2001 (66 FR... entitled, ``Emergency Medical Equipment,'' published on April 12, 2001 (66 FR 19028), the preamble...

  17. Medical equipment management strategies.

    PubMed

    Wang, Binseng; Furst, Emanuel; Cohen, Ted; Keil, Ode R; Ridgway, Malcolm; Stiefel, Robert

    2006-01-01

    Clinical engineering professionals need to continually review and improve their management strategies in order to keep up with improvements in equipment technology, as well as with increasing expectations of health care organizations. In the last 20 years, management strategies have evolved from the initial obsession with electrical safety to flexible criteria that fit the individual institution's needs. Few hospitals, however, are taking full advantage of the paradigm shift offered by the evolution of joint Commission standards. The focus should be on risks caused by equipment failure, rather than on equipment with highest maintenance demands. Furthermore, it is not enough to consider risks posed by individual pieces of equipment to individual patients. It is critical to anticipate the impact of an equipment failure on larger groups of patients, especially when dealing with one of a kind, sophisticated pieces of equipment that are required to provide timely and accurate diagnoses for immediate therapeutic decisions or surgical interventions. A strategy for incorporating multiple criteria to formulate appropriate management strategies is provided in this article. PMID:16796335

  18. Listing of Food Service Equipment.

    ERIC Educational Resources Information Center

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    A comprehensive listing of food service equipment including--(1) companies authorized to use the National Sanitation Foundation seal of approval, and (2) equipment listed as meeting NSF standards including soda fountains, spray-type dishwashers, dishwashing equipment, cooking equipment, commerical cooking and warming equipment, freezers,…

  19. Wellhead equipment support

    SciTech Connect

    Nichols, R.P.

    1987-03-24

    A wellhead assembly is described for supporting equipment in a well, comprising: a suspension nut having a threaded outer surface; a wellhead member having an inner threaded surface adapted to mesh with the threaded outer surface of the suspension nut; the suspension nut having a projection extending axially from its threaded outer surface and having an inner surface adapted to support equipment in the well; at least a portion of the inner surface for supporting the equipment facing both inwardly and upwardly such that force exerted by the weight of the equipment against the inner surface is transformed at least in part to a radially outwardly directed force; the projecting having an outer surface sized such that the outer surface is spaced from an inner surface of the wellhead member in the absence of force exerted against the inner surface of the projection such that the projection is deflected outwardly by the force exerted by the weight of the equipment against the inner surface.

  20. German mining equipment

    SciTech Connect

    Not Available

    1993-10-01

    The German mining equipment industry developed to supply machines and services to the local mining industry, i.e., coal, lignite, salt, potash, ore mining, industrial minerals, and quarrying. The sophistication and reliability of its technology also won it worldwide export markets -- which is just as well since former major domestic mining sectors such as coal and potash have declined precipitously, and others such as ore mining have all but disappeared. Today, German mining equipment suppliers focus strongly on export sales, and formerly unique German mining technologies such as continuous mining with bucket wheel excavators and conveyors for open pits, or plowing of underground coal longwalls are widely used abroad. The status of the German mining equipment industry is reviewed.

  1. [Medical Equipment Maintenance Methods].

    PubMed

    Liu, Hongbin

    2015-09-01

    Due to the high technology and the complexity of medical equipment, as well as to the safety and effectiveness, it determines the high requirements of the medical equipment maintenance work. This paper introduces some basic methods of medical instrument maintenance, including fault tree analysis, node method and exclusive method which are the three important methods in the medical equipment maintenance, through using these three methods for the instruments that have circuit drawings, hardware breakdown maintenance can be done easily. And this paper introduces the processing methods of some special fault conditions, in order to reduce little detours in meeting the same problems. Learning is very important for stuff just engaged in this area. PMID:26904890

  2. Bicycle safety equipment.

    PubMed

    Ellis, T H; Streight, D; Mellion, M B

    1994-01-01

    It is important for the physician to understand bicycle safety equipment in order to prevent and treat bicycle-related injuries effectively. The physician should understand (1) the basic design and function of bicycles, (2) the relationship of improper bicycle fit to injuries, (3) the potential of the various forms of serious riding and racing for injury, and (4) bicycle safety equipment and the standards involved in its fit, manufacture, and care. A decision to use bicycle safety equipment is a decision to control the risk of injury. Physicians should accept a share of the responsibility for decreasing bicycling-related injuries, because they are viewed by the public as credible sources of information regarding the prevention of accidents and injuries. PMID:8111858

  3. Equipment Operational Requirements

    SciTech Connect

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  4. SILEX Beacon equipment

    NASA Astrophysics Data System (ADS)

    Crepin, Pierre-Jean; Leblay, Pierrick; Haller, Regine; Tremillon, Isabelle; Sonon, Jean-Pierre

    1990-07-01

    The design of this equipment based on the use of nineteen 500 mW laser diodes is presented. The Beacon is a powerful and collimated optical source based upon semi-conductor lasers. This equipment is implemented in the SILEX GEO2 terminal and its function is to provide a continuous wave light beam towards the LEO or GEO1 satellites during the acquisition phases. The design was experimentally validated with a functional breadboard, and test results demonstrated the feasibility of every performance required by the SILEX system.

  5. Equipment Management Manual

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The NASA Equipment Management Manual (NHB 4200.1) is issued pursuant to Section 203(c)(1) of the National Aeronautics and Space Act of 1958, as amended (42 USC 2473), and sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for the acquisition, management, and use of NASA-owned equipment. This revision is effective upon receipt. This is a controlled manual, issued in loose-leaf form, and revised through page changes. Additional copies for internal use may be obtained through normal distribution.

  6. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402 Equipment contract closeout. This section is applicable to contracts executed on RUS Form 198. (a) Final... 7 Agriculture 11 2010-01-01 2010-01-01 false Equipment contract closeout. 1726.402 Section...

  7. Equipment & New Products.

    ERIC Educational Resources Information Center

    Poitras, Adrian W., Ed.

    1977-01-01

    Presents information about equipment and new products such as the melting point instrument and TV-microscope coupler which are helpful in college science teaching. Descriptions of each product, how it operates, its prices, and address for ordering are presented. (HM)

  8. Adaptive Equipment from Boxes.

    ERIC Educational Resources Information Center

    Blanche, Erna, O'Brian, Maryann

    1984-01-01

    The article presents four readily accessible inexpensive equipment designs to promote effective remedial body positioning for children with neuromotor or developmental delays. Assembly instructions are offered for the side lyer, the side sitter, the lab board, and the floor table. (CL)

  9. Lennox - Student Training Equipment.

    ERIC Educational Resources Information Center

    Lennox Industries, Inc., Marshalltown, IA.

    Presents a series of demonstration units designed by Lennox Industries for the purpose of training students to become familiar with Lennox mechanical equipment. Demonstrators are designed to present technical information in a clear simplified manner thus reducing frustration for the beginning trainee. The following demonstrators are available--(1)…

  10. Engineer Equipment Operator.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by engineer equipment operators. Addressed in the seven individual units of the course are the following topics: introduction to Military Occupation Specialty (MOS) 1345…

  11. Engineer Equipment Chief.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by engineer equipment chiefs. Addressed in the five individual units of the course are the following topics: construction management (planning, scheduling, and supervision);…

  12. The EQUIP Program

    ERIC Educational Resources Information Center

    Gibbs, John C.; Potter, Granville Bud; DiBiase, Ann-Marie; Devlin, Renee

    2008-01-01

    Youth who present anti-social behavior need powerful interventions that strengthen empathy, counter negative peer influence, and challenge thinking errors. This article recaps some key points about EQUIP, a Positive Peer Culture (PPC)-based cognitive behavioral intervention program for behaviorally at-risk youth, and notes how the program has…

  13. Dairy Equipment Lubrication

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Lake To Lake Dairy Cooperative, Manitowoc, Wisconsin, operates four plants in Wisconsin for processing milk, butter and cheese products from its 1,300 member farms. The large co-op was able to realize substantial savings by using NASA information for improved efficiency in plant maintenance. Under contract to Marshall Space Flight Center, Midwest Research Institute compiled a handbook consolidating information about commercially available lubricants. The handbook details chemical and physical properties, applications, specifications, test procedures and test data for liquid and solid lubricants. Lake To Lake's plant engineer used the handbook to effect savings in maintenance labor and materials costs by reducing the number of lubricants used on certain equipment. Strict U.S. Department of Agriculture and Food and Drug Administration regulations preclude lubrication changes n production equipment, but the co-op's maintenance chief was able to eliminate seven types of lubricants for ancillary equipment, such as compressors and high pressure pumps. Handbook data enabled him to select comparable but les expensive lubricants in the materials consolidation process, and simplified lubrication schedules and procedures. The handbook is in continuing use as a reference source when a new item of equipment is purchased.

  14. Basic Engineer Equipment Mechanic.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by basic engineer equipment mechanics. Addressed in the four individual units of the course are the following topics: mechanics and their tools (mechanics, hand tools, and power…

  15. Maintaining gas cooling equipment

    SciTech Connect

    Rector, J.D.

    1997-05-01

    An often overlooked key to satisfactory operation and longevity of any mechanical device is proper operation and maintenance in accordance with the manufacturer`s written instructions. Absorption chillers, although they use a different technology than the more familiar vapor compression cycle to produce chilled water, operate successfully in a variety of applications if operated and maintained properly. Maintenance procedures may be more frequent than those required for vapor compression chillers, but they are also typically less complex. The goal of this article is to describe the basic operation of an absorption chiller to provide an understanding of the relatively simple tasks required to keep the machine operating at maximum efficiency for its design life and beyond. A good starting point is definitions. Gas cooling equipment is generally defined as alternative energy, non-electric cooling products. This includes absorption chillers, engine-drive chillers and packaged desiccant units, among others. Natural gas combustion drives the equipment.

  16. Orbiter based construction equipment

    NASA Technical Reports Server (NTRS)

    Goodwin, C. J.

    1982-01-01

    Many orbiter based activities need equipment to hold a payload steady while it is being worked on. This work may be construction, updating, repair, services, check out, or refueling operations in preparation for return to Earth. The Handling and Positioning Aid (HPA) is intended for use as general purpose equipment. The HPA provides a wide choice of work station positions, both immediately above the orbiter cargo bay and beyond. It can act in a primary docking role and, if required, can assist actively in the berthing process. From an analysis of ten reference missions, it was determined that two types of HPA mobility are needed; a tilt table, which simply swings out of the cargo bay, pivoting about an athwartships y axis, and an articulated arm. Illustration of the aid are provided.

  17. Equipment Failure Analysis

    NASA Astrophysics Data System (ADS)

    1980-01-01

    Tennessee Eastman uses NASTRAN to minimize lost production by pinpointing the causes of equipment failures and preventing recurrences. An example of the program's utility involves a large centrifugal fan which developed cracks during start-ups and shutdowns. This information prompted redesign of the fan. Tennessee Eastman has made extensive use of NASTRAN, both as failure analysis tool and as an aid in redesigning production hardware.

  18. HVAC equipment and noise

    SciTech Connect

    Cerami, V.J.

    1996-03-01

    The purpose of this article is to define how the selection of HVAC equipment and layout impact the achievable noise criteria (NC) levels in occupied spaces. It will focus on the design of HVAC systems that employ floor-by-floor air handling/air conditioning units and their acoustical ramifications. This is of increasing importance since tenants require incorporation of noise limits in lease agreements.

  19. Final Technical Report

    SciTech Connect

    Gilbert, Chris

    2014-11-13

    The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

  20. Secure authenticated video equipment

    SciTech Connect

    Doren, N.E.

    1993-07-01

    In the verification technology arena, there is a pressing need for surveillance and monitoring equipment that produces authentic, verifiable records of observed activities. Such a record provides the inspecting party with confidence that observed activities occurred as recorded, without undetected tampering or spoofing having taken place. The secure authenticated video equipment (SAVE) system provides an authenticated series of video images of an observed activity. Being self-contained and portable, it can be installed as a stand-alone surveillance system or used in conjunction with existing monitoring equipment in a non-invasive manner. Security is provided by a tamper-proof camera enclosure containing a private, electronic authentication key. Video data is transferred communication link consisting of a coaxial cable, fiber-optic link or other similar media. A video review station, located remotely from the camera, receives, validates, displays and stores the incoming data. Video data is validated within the review station using a public key, a copy of which is held by authorized panics. This scheme allows the holder of the public key to verify the authenticity of the recorded video data but precludes undetectable modification of the data generated by the tamper-protected private authentication key.

  1. A flight-test and simulation evaluation of the longitudinal final approach and landing performance of an automatic system for a light wing loading STOL aircraft equipped with wing spoilers

    NASA Technical Reports Server (NTRS)

    Brown, S. C.; Hardy, G. H.; Hindson, W. S.

    1984-01-01

    As part of a comprehensive flight-test investigation of short takeoff and landing (STOL) operating systems for the terminal systems for the terminal area, an automatic landing system has been developed and evaluated for a light wing-loading turboprop-powered aircraft. An advanced digital avionics system performed display, navigation, guidance, and control functions for the test aircraft. Control signals were generated in order to command powered actuators for all conventional controls and for a set of symmetrically driven wing spoilers. This report describes effects of the spoiler control on longitudinal autoland (automatic landing) performance. Flight-test results, with and without spoiler control, are presented and compared with available (basically, conventional takeoff and landing) performance criteria. These comparisons are augmented by results from a comprehensive simulation of the controlled aircraft that included representations of the microwave landing system navigation errors that were encountered in flight as well as expected variations in atmospheric turbulence and wind shear. Flight-test results show that the addition of spoiler control improves the touchdown performance of the automatic landing system. Spoilers improve longitudinal touchdown and landing pitch-attitude performance, particularly in tailwind conditions. Furthermore, simulation results indicate that performance would probably be satisfactory for a wider range of atmospheric disturbances than those encountered in flight. Flight results also indicate that the addition of spoiler control during the final approach does not result in any measurable change in glidepath track performance, and results in a very small deterioration in airspeed tracking. This difference contrasts with simulations results, which indicate some improvement in glidepath tracking and no appreciable change in airspeed tracking. The modeling problem in the simulation that contributed to this discrepancy with flight was

  2. 12. VIEW OF REMOTELY OPERATED EQUIPMENT. OPERATORS VIEWED THE EQUIPMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW OF REMOTELY OPERATED EQUIPMENT. OPERATORS VIEWED THE EQUIPMENT THROUGH A WATER-FILLED WINDOW. (10/8/81) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  3. Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation

    SciTech Connect

    Wu Dianliang; Zhu Hongmin

    2010-05-21

    Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools and equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.

  4. Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation

    NASA Astrophysics Data System (ADS)

    Wu, Dianliang; Zhu, Hongmin

    2010-05-01

    Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools and equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.

  5. Getting Equipped and Staying Equipped, Part 2: Finding the Funds.

    ERIC Educational Resources Information Center

    Jordahl, Gregory; Orwig, Ann

    1995-01-01

    Suggests how school libraries can fund computer equipment; gain assistance from high-tech businesses; develop business partnerships and foundations; lease equipment; accept equipment donations; fund raise; build money into the budget; and communicate school needs with budget voters. Sidebars include leasing advice; resources for parent-teacher…

  6. Highway Maintenance Equipment Operator. Specialized Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes 18 units of instruction covering the large equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance objectives,…

  7. Highway Maintenance Equipment Operator. Miscellaneous Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes six units of instruction covering the small, specialized equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance…

  8. Precision Instrument and Equipment Repairers.

    ERIC Educational Resources Information Center

    Wyatt, Ian

    2001-01-01

    Explains the job of precision instrument and equipment repairers, who work on cameras, medical equipment, musical instruments, watches and clocks, and industrial measuring devices. Discusses duties, working conditions, employment and earnings, job outlook, and skills and training. (JOW)

  9. Guidelines for Purchasing Playground Equipment.

    ERIC Educational Resources Information Center

    Neugebauer, Roger

    1998-01-01

    Notes that the purchase of playground equipment is one of the most important decisions center directors make. Offers advice from a number of playground equipment manufacturers that suggests directors consider activities, safety, construction, installation, and warranty when purchasing equipment. Also suggests interviewing other directors about…

  10. Adapting Equipment for Special Needs.

    ERIC Educational Resources Information Center

    Tarr, Sue

    1992-01-01

    All students benefit from physical education, but equipment used in mainstream programs often is not appropriate for students with special needs. Equipment adaptation is necessary to improve students' opportunities for successful participation in class. The article describes how to create and finance adapted equipment and offers a resource list.…

  11. Safety Equipment in the Lab.

    ERIC Educational Resources Information Center

    Denham, Willard A.S.

    1964-01-01

    Findings of two recent surveys on safety equipment in laboratory facilities are presented. The first survey was a pilot study of emergency shower and eye wash equipment. This study was followed by a more comprehensive random survey of safety equipment in 2,820 labs. Among other findings, the surveys indicate that many plants are underequipped, or…

  12. Decision Analysis for Equipment Selection

    ERIC Educational Resources Information Center

    Cilliers, J. J.

    2005-01-01

    Equipment selection during process design is a critical aspect of chemical engineering and requires engineering judgment and subjective analysis. When educating chemical engineering students in the selection of proprietary equipment during design, the focus is often on the types of equipment available and their operating characteristics. The…

  13. Characterization equipment essential drawing plan

    SciTech Connect

    WILSON, G.W.

    1999-05-18

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed.

  14. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  15. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  16. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  17. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  18. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  19. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  20. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  1. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  2. 40 CFR 264.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment, structures and soils. 264.114 Section 264.114 Protection of Environment ENVIRONMENTAL PROTECTION... of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soils must be properly disposed of or decontaminated unless otherwise specified...

  3. 40 CFR 265.114 - Disposal or decontamination of equipment, structures and soils.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment, structures and soils. 265.114 Section 265.114 Protection of Environment ENVIRONMENTAL PROTECTION... decontamination of equipment, structures and soils. During the partial and final closure periods, all contaminated equipment, structures and soil must be properly disposed of, or decontaminated unless specified otherwise...

  4. 75 FR 54025 - Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative Technology Revisions'' (74 FR 45004). This final rule amended its requirements for oil-spill removal equipment associated... facility with appropriate equipment and resources located in each zone of operation; specific lists...

  5. 77 FR 67290 - Basic Service Tier Encryption Compatibility Between Cable Systems and Consumer Electronics Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... Electronics Equipment AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY: In this document... between consumer electronics equipment (such as digital television sets) and newly encrypted cable service...''), Congress sought to make sure that consumer electronics equipment could receive cable programming and...

  6. Orbital construction support equipment

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Approximately 200 separate construction steps were defined for the three solar power satellite (SPS) concepts. Detailed construction scenarios were developed which describe the specific tasks to be accomplished, and identify general equipment requirements. The scenarios were used to perform a functional analysis, which resulted in the definition of 100 distinct SPS elements. These elements are the components, parts, subsystems, or assemblies upon which construction activities take place. The major SPS elements for each configuration are shown. For those elements, 300 functional requirements were identified in seven generic processes. Cumulatively, these processes encompass all functions required during SPS construction/assembly. Individually each process is defined such that it includes a specific type of activity. Each SPS element may involve activities relating to any or all of the generic processes. The processes are listed, and examples of the requirements defined for a typical element are given.

  7. Seismic qualification of unanchored equipment

    SciTech Connect

    Moran, T.J.

    1995-12-01

    This paper describes procedures used to design and qualify unanchored equipment to survive Seismic events to the PC = 4 level in a moderate seismic area. The need for flexibility to move experimental equipment together with the requirements for remote handling in a highly-radioactive non-reactor nuclear facility precluded normal equipment anchorage. Instead equipment was designed to remain stable under anticipated DBE floor motions with sufficient margin to achieve the performance goal. The equipment was also designed to accommodate anticipated sliding motions with sufficient. The simplified design criteria used to achieve these goals were based on extensive time-history simulations of sliding, rocking, and overturning of generic equipment models. The entire process was subject to independent peer review and accepted in a Safety Evaluation Report. The process provides a model suitable for adaptation to similar applications and for assessment of the potential for seismic damage of existing, unanchored equipment In particular, the paper describes: (1) Two dimensional sliding studies of deformable equipment subject to 3-D floor excitation as the basis for simplified sliding radius and sliding velocity design criteria. (2) Two dimensional rocking and overturning simulations of rigid equipment used to establish design criteria for minimum base dimensions and equipment rigidity to prevent overturning. (3) Assumed mode rocking analyses of deformable equipment models used to establish uplift magnitudes and subsequent impacts during stable rocking motions. The model used for these dynamic impact studies is reported elsewhere.

  8. The development of straightness measuring equipment. Final report

    SciTech Connect

    Demint, P.D.; Abraham, M.

    1997-05-20

    This report details work performed between Lockheed Martin Energy Systems, Inc. (LMES) and UTE Straight-O-Matic (UTE) under the National Machine Tool Partnership program. This work included the design and construction of an automatic straightness measuring system capable of retrofitting to existing machines. 1 fig.

  9. precision deburring using NC and robot equipment. Final report

    SciTech Connect

    Gillespie, L.K.

    1980-05-01

    Deburring precision miniature components is often time consuming and inconsistent. Although robots are available for deburring parts, they are not precise enough for precision miniature parts. Numerical control (NC) machining can provide edge break consistencies to meet requirements such as 76.2-..mu..m maximum edge break (chamfer). Although NC machining has a number of technical limitations which prohibits its use on many geometries, it can be an effective approach to features that are particularly difficult to deburr.

  10. Equipment proposal for Bevalac experiments. Final technical report

    SciTech Connect

    Brady, F. P.; Romero, J. L.

    1983-01-01

    A large Multiple Sampling Ionization Chamber (MUSIC) has been developed as a part of the Heavy Ion Spectrometer System (HISS). This facility is being used for the study of relativistic nuclear collisions at the Bevalac of Lawrence Berkeley Laboratory. We have measured for MUSIC a single event resolution of 15% for Fe beam and a charge resolution better than 0.5 units of charge for a Ne beam. These results indicate that a charge resolution of one unit from Z = 7 to Z = 100 should be achieved with the present detector.

  11. 76 FR 35006 - Recovery Policy RP9525.16, Research-Related Equipment and Furnishings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... (75 FR 49506). FEMA received and adjudicated the comments. While the final policy does not make... SECURITY Federal Emergency Management Agency Recovery Policy RP9525.16, Research-Related Equipment and... document provides notice of the availability of the final policy RP9525.16, Research-related Equipment...

  12. Space station wardroom habitability and equipment study

    NASA Technical Reports Server (NTRS)

    Nixon, David; Miller, Christopher; Fauquet, Regis

    1989-01-01

    Experimental designs in life-size mock-up form for the wardroom facility for the Space Station Habitability Module are explored and developed. In Phase 1, three preliminary concepts for the wardroom configuration are fabricated and evaluated. In Phase 2, the results of Phase 1 are combined with a specific range of program design requirements to provide the design criteria for the fabrication of an innovative medium-fidelity mock-up of a wardrobe configuration. The study also focuses on the design and preliminary prototyping of selected equipment items including crew exercise compartments, a meal/meeting table and a portable workstation. Design criteria and requirements are discussed and documented. Preliminary and final mock-ups and equipment prototypes are described and illustrated.

  13. Equipping surgeons as educators.

    PubMed

    Fry, Heather

    2009-03-01

    There is a developing interest in equipping surgeons as educators but a perceived lack of knowledge and evidence about how to do this effectively, or how to reward and recognize educational expertise within the surgical career structure. A brief consideration of the surgical educator role is offered. The findings and conclusions of a meta-analysis of the influence of faculty development in medical education are summarized. Various sources are drawn on to present an overview of master's level provision in medical education and a master's in surgical education is outlined. Issues relating to developing suitable curricula, educational accreditation, recognition, reward and career structure are raised and some UK approaches to these areas summarized. Evidence indicates the importance of context in training medical educators, the value of experiential learning, training that is spread over time and training that mixes theory, practice and reflection. A schema for recognizing educational expertise, created as an outcome of analysis of the evidence and current provision, is presented. The effect of a possible change from educational training being voluntary to the introduction of a compulsory regime is raised as an area requiring further discussion and evidence collection. Mechanisms by which to acknowledge, reward and recognize education expertise in surgeons do not generally exist; it is suggested their development would be timely. PMID:19317787

  14. Unattended optical surveillance equipment

    NASA Astrophysics Data System (ADS)

    Mangan, D. L.; Johnson, C. S.; Schneider, S. L.

    In many security situations, it is necessary to utilize unattended optical surveillance systems. Sandia National Laboratories has developed three optical surveillance systems which operate in the unattended surveillance mode. The first of these systems is known as the Modular Integrated Video System (MIVS). The MIVS is a microprocessor controlled video system which records scenes at selectable intervals. Each scene consists of six to ten frames recorded on a 8 mm videotape. A MIVS video recorder has the capacity to record approximately 26,000 scenes. Scenes can be recorded at intervals ranging from 1 to 99 minutes between recordings. The unit has been designed for permanent installation with facility power. The camera can be located up to 30 m from the recording module with the authentication technology protecting the cable connecting the camera to the recording unit. The Portable Surveillance unit (PSU) is a second system which has been designed for unattended operation. The PSU is designed for situations where quick set up of an optical surveillance device is required. The PSU operates in a manner similar to the MIVS and can be operated off of facility power for long time periods, or from an internal battery pack for short term surveillance applications. The Video Surveillance Unit (VSU) provides similar capabilities for permanent rack mounted installations. This paper describes the MIVS, the PSU, and the VSU, and discusses potential applications for the system. Equipment for reviewing the videotapes produced by the systems is also described.

  15. Equipment for large-scale mammalian cell culture.

    PubMed

    Ozturk, Sadettin S

    2014-01-01

    This chapter provides information on commonly used equipment in industrial mammalian cell culture, with an emphasis on bioreactors. The actual equipment used in the cell culture process can vary from one company to another, but the main steps remain the same. The process involves expansion of cells in seed train and inoculation train processes followed by cultivation of cells in a production bioreactor. Process and equipment options for each stage of the cell culture process are introduced and examples are provided. Finally, the use of disposables during seed train and cell culture production is discussed. PMID:24429549

  16. Research on invulnerability of equipment support information network

    NASA Astrophysics Data System (ADS)

    Sun, Xiao; Liu, Bin; Zhong, Qigen; Cao, Zhiyi

    2013-03-01

    In this paper, the entity composition of equipment support information network is studied, and the network abstract model is built. The influence factors of the invulnerability of equipment support information network are analyzed, and the invulnerability capabilities under random attack are analyzed. According to the centrality theory, the materiality evaluation centralities of the nodes are given, and the invulnerability capabilities under selective attack are analyzed. Finally, the reasons that restrict the invulnerability of equipment support information network are summarized, and the modified principles and methods are given.

  17. Orbiter electrical equipment utilization baseline

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The baseline for utilization of Orbiter electrical equipment in both electrical and Environmental Control and Life Support System (ECLSS) thermal analyses is established. It is a composite catalog of Space Shuttle equipment, as defined in the Shuttle Operational Data Book. The major functions and expected usage of each component type are described. Functional descriptions are designed to provide a fundamental understanding of the Orbiter electrical equipment, to insure correlation of equipment usage within nominal analyses, and to aid analysts in the formulation of off-nominal, contingency analyses.

  18. Information technology equipment cooling system

    DOEpatents

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  19. Equipment design guidance document for flammable gas waste storage tank new equipment

    SciTech Connect

    Smet, D.B.

    1996-04-11

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas.

  20. Power Product Equipment Technician: Equipment Systems. Teacher Edition. Student Edition.

    ERIC Educational Resources Information Center

    Hilley, Robert

    This packet contains teacher and student editions on the topic of equipment systems, intended for the preparation of power product equipment technicians. This publication contains seven units: (1) principles of power transmission; (2) mechanical drive systems; (3) principles of fluid power; (4) hydraulic and pneumatic drive systems; (5) wheel and…

  1. 141. ARAIII Equipment location plan. Includes list of equipment and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    141. ARA-III Equipment location plan. Includes list of equipment and location in reactor, control, and other buildings. Aerojet-general 880-area/GCRE-101-U-1. Date: February 1958. Ineel index code no. 063-0101-65-013-192508. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  2. Heavy Equipment Mechanic Program Guide.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Dept. of Vocational Education.

    Designed to train an entry-level mechanic, this heavy equipment mechanic program guide presents the standard curriculum for technical institutes in Georgia. The curriculum addresses the minimum competencies for a heavy equipment mechanic program. The general information section contains the following: purpose and objectives; program description,…

  3. Available Equipment in School Foodservice.

    ERIC Educational Resources Information Center

    Meyer, Mary Kay

    This report provides data on the National Food Service Management Institute's multi-year research project that identified type, style, age, and condition of available food service equipment in K-12 schools nationwide. The study found that smaller schools, serving less than 400 lunches per day, had kitchens equipped with ranges, small…

  4. Food Service Equipment and Appurtenances.

    ERIC Educational Resources Information Center

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  5. Heavy Equipment Mechanic. Instructor Edition.

    ERIC Educational Resources Information Center

    Hendrix, Laborn J.; And Others

    This manual is intended to assist heavy equipment instructors in teaching the latest concepts and functions of heavy equipment. It includes 7 sections and 27 instructional units. Sections (and units) are: orientation (shop safety and first aid, hand tools and miscellaneous tools, measuring, basic rigging and hoisting), engines (basic engine…

  6. Information technology equipment cooling method

    DOEpatents

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  7. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    SciTech Connect

    NA

    1997-09-29

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive.

  8. Final/Progress Report for Instrumentation Grant

    SciTech Connect

    1997-03-31

    The major piece of equipment was a Furnace Model 1000 used during the Nitrate to Ammonia and Ceramic (NAC) process to sinter the ceramic final product. NAC is a new technology to immobilize liquid radioactive waste simulants. The grant also funded related control and measuring equipment.

  9. Heavy Equipment Mechanic Program Standards.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Dept. of Vocational Education.

    This publication contains statewide standards for the heavy equipment mechanic program in Georgia. The standards are divided into 12 categories: foundations (philosophy, purpose, goals, program objectives, availability, evaluation); admissions (admission requirements, provisional admission requirements, recruitment, evaluation and planning);…

  10. Water-Using Equipment: Domestic

    SciTech Connect

    Solana, Amy E.; Mcmordie, Katherine

    2006-01-24

    Water management is an important aspect of energy engineering. This article addresses water-using equipment primarily used for household purposes, including faucets, showers, toilets, urinals, dishwashers, and clothes washers, and focuses on how the equipment can be optimized to save both water and energy. Technology retrofits and operation and maintenance changes are the primary methods discussed for water and energy conservation. Auditing to determine current consumption rates is also described for each technology.

  11. 11. DETAILED VIEW OF LATHE EQUIPMENT. LATHES WERE USED TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. DETAILED VIEW OF LATHE EQUIPMENT. LATHES WERE USED TO FORM THE FINAL SHAPE OF THE FIRST TRIGGER DESIGN. (4/4/66) - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO

  12. VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING 991. (6/7/68) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO

  13. Research on Computer Aided Innovation Model of Weapon Equipment Requirement Demonstration

    NASA Astrophysics Data System (ADS)

    Li, Yong; Guo, Qisheng; Wang, Rui; Li, Liang

    Firstly, in order to overcome the shortcoming of using only AD or TRIZ solely, and solve the problems currently existed in weapon equipment requirement demonstration, the paper construct the method system of weapon equipment requirement demonstration combining QFD, AD, TRIZ, FA. Then, we construct a CAI model frame of weapon equipment requirement demonstration, which include requirement decomposed model, requirement mapping model and requirement plan optimization model. Finally, we construct the computer aided innovation model of weapon equipment requirement demonstration, and developed CAI software of equipment requirement demonstration.

  14. Postoutbreak disinfection of mobile equipment.

    PubMed

    Alphin, R L; Ciaverelli, C D; Hougentogler, D P; Johnson, K J; Rankin, M K; Benson, E R

    2010-03-01

    Current control strategies for avian influenza virus, exotic Newcastle disease, and other highly contagious poultry diseases include surveillance, quarantine, depopulation, disposal, and decontamination. Skid steer loaders and other mobile equipment are extensively used during depopulation and disposal. Movement of contaminated equipment has been implicated in the spread of disease in previous outbreaks. One approach to equipment decontamination is to power wash the equipment, treat with a liquid disinfectant, change any removable filters, and let it sit idle for several days. In this project, multiple disinfectant strategies were individually evaluated for their effectiveness at inactivating Newcastle disease virus (NDV) on mechanical equipment seeded with the virus. A small gasoline engine was used to simulate typical mechanical equipment. A high titer of LaSota strain, NDV was applied and dried onto a series of metal coupons. The coupons were then placed on both interior and exterior surfaces of the engine. Liquid disinfectants that had been effective in the laboratory were not as effective at disinfecting the engine under field conditions. Indirect thermal fog showed a decrease in overall virus titer or strength. Direct thermal fog was more effective than liquid spray application or indirect thermal fog application. PMID:20521731

  15. Electricity used by office equipment and network equipment in the U.S.: Detailed report and appendices

    SciTech Connect

    Kawamoto, Kaoru; Koomey, Jonathan G.; Nordman, Bruce; Brown, Richard E.; Piette, Mary Ann; Ting, Michael; Meier, Alan K.

    2001-02-01

    In spite of the recent explosive growth in the use of office and network equipment, there has been no recent study that estimates in detail how much electricity is consumed by that equipment in the United States. In this study, we examined energy use by office equipment and network equipment at the end of 1999. We classified office equipment into 11 types; for each type we estimated annual energy consumption for residential, commercial, and industrial use by combining estimates of stock, power requirements, usage, and saturation of power management. We also classified network equipment into six types and estimated the annual energy consumption for each type. We found that total direct power use by office and network equipment is about 74 TWh per year, which is about 2% of total electricity use in the U.S. When electricity used by telecommunications equipment and electronics manufacturing is included, that figure rises to 3% of all electricity use (Koomey 2000). More than 70% of the 74 TWh/year is dedicated to office equipment for commercial use. We also found that power management currently saves 23 TWh/year, and complete saturation and proper functioning of power management would achieve additional savings of 17 TWh/year. Furthermore, complete saturation of night shutdown for equipment not required to operate at night would reduce power use by an additional 7 TWh/year. Finally, we compared our current estimater with our 1995 forecast for 1999. We found that the total difference between our current estimate and the previous forecast is less than 15% and identified the factors that led to inaccuracies in the previous forecast. We also conducted a sensitivity analysis of the uncertainties in our current forecast and identified the data sets that have the largest impact on our current estimate of energy use.

  16. Equipment Efficiency for Healthy School Meals. [Videotape].

    ERIC Educational Resources Information Center

    National Food Service Management Inst., University, MS.

    A satellite seminar on large-scale food production equipment discusses ways child nutrition personnel can maximize use of existing equipment, considers research related to use of existing equipment, explains plan reviews for equipment selection and purchase, and explores new equipment options. Examples illustrate use of planning or modernizing…

  17. 14 CFR 25.1415 - Ditching equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Ditching equipment. 25.1415 Section 25.1415... STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Safety Equipment § 25.1415 Ditching equipment. (a) Ditching equipment used in airplanes to be certificated for ditching under § 25.801, and required by...

  18. 14 CFR 27.1415 - Ditching equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Ditching equipment. 27.1415 Section 27.1415... STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Safety Equipment § 27.1415 Ditching equipment. (a) Emergency flotation and signaling equipment required by any operating rule in this chapter must meet the...

  19. 14 CFR 23.1415 - Ditching equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Ditching equipment. 23.1415 Section 23.1415... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Equipment Safety Equipment § 23.1415 Ditching equipment. (a) Emergency flotation and signaling equipment required by any operating rule in...

  20. 21 CFR 225.30 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 225.30 Section 225.30 Food and Drugs... Equipment § 225.30 Equipment. (a) Equipment which is designed to perform its intended function and is properly installed and used is essential to the manufacture of medicated feeds. Such equipment...

  1. 14 CFR 29.1415 - Ditching equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Ditching equipment. 29.1415 Section 29.1415... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Safety Equipment § 29.1415 Ditching equipment. (a) Emergency flotation and signaling equipment required by any operating rule of this chapter must meet...

  2. 21 CFR 226.30 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 226.30 Section 226.30 Food and Drugs... Facilities and Equipment § 226.30 Equipment. Equipment used for the manufacture, processing, packaging, bulk... facilitate maintenance and operation for its intended purpose. The equipment shall: (a) Be so...

  3. 40 CFR 63.1022 - Equipment identification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Equipment identification. 63.1022... identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification of the equipment does not require physical tagging of the equipment. For example, the...

  4. 40 CFR 63.1003 - Equipment identification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Equipment identification. 63.1003...) National Emission Standards for Equipment Leaks-Control Level 1 § 63.1003 Equipment identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification...

  5. 40 CFR 63.1003 - Equipment identification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Equipment identification. 63.1003...) National Emission Standards for Equipment Leaks-Control Level 1 § 63.1003 Equipment identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification...

  6. 40 CFR 65.103 - Equipment identification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Equipment identification. 65.103... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Equipment Leaks § 65.103 Equipment identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification of...

  7. 40 CFR 65.103 - Equipment identification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Equipment identification. 65.103 Section 65.103 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Equipment Leaks § 65.103 Equipment identification. (a) General equipment identification. Equipment subject to...

  8. 40 CFR 63.1022 - Equipment identification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Equipment identification. 63.1022... identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification of the equipment does not require physical tagging of the equipment. For example, the...

  9. 40 CFR 65.103 - Equipment identification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Equipment identification. 65.103... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Equipment Leaks § 65.103 Equipment identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification of...

  10. 40 CFR 63.1022 - Equipment identification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Equipment identification. 63.1022... identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification of the equipment does not require physical tagging of the equipment. For example, the...

  11. 40 CFR 63.1003 - Equipment identification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Equipment identification. 63.1003...) National Emission Standards for Equipment Leaks-Control Level 1 § 63.1003 Equipment identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification...

  12. 40 CFR 65.103 - Equipment identification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Equipment identification. 65.103... (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Equipment Leaks § 65.103 Equipment identification. (a) General equipment identification. Equipment subject to this subpart shall be identified. Identification of...

  13. 1968 Listing of Swimming Pool Equipment.

    ERIC Educational Resources Information Center

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  14. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  15. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  16. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  17. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  18. 14 CFR 121.345 - Radio equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind...

  19. 40 CFR 264.32 - Required equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...), spill control equipment, and decontamination equipment; and (d) Water at adequate volume and pressure to supply water hose streams, or foam producing equipment, or automatic sprinklers, or water spray systems. ....32 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES...

  20. 40 CFR 264.32 - Required equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...), spill control equipment, and decontamination equipment; and (d) Water at adequate volume and pressure to supply water hose streams, or foam producing equipment, or automatic sprinklers, or water spray systems. ....32 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES...

  1. 23 CFR 140.910 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Railroad Work § 140.910 Equipment. (a) Company owned equipment. Cost of company-owned equipment may be reimbursed for the average or actual cost of operation, light and running repairs, and depreciation, or...

  2. 23 CFR 140.910 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Railroad Work § 140.910 Equipment. (a) Company owned equipment. Cost of company-owned equipment may be reimbursed for the average or actual cost of operation, light and running repairs, and depreciation, or...

  3. 45 CFR 1183.32 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTITUTE OF MUSEUM AND LIBRARY SERVICES UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE...) Management requirements. Procedures for managing equipment (including replacement equipment),...

  4. Heavy Equipment Operator: General Equipment Operator. Instructional Materials.

    ERIC Educational Resources Information Center

    Hendrix, Laborn J.; Sawatzky, Joyce

    Developed through close coordination between contractors, construction workers, and vocational educators, this instructor's manual is designed to help heavy equipment instructors present materials in a systematic format. The instructional materials in the manual are written in terms of student performance, using measurable behavioral objectives.…

  5. Power Product Equipment Technician: Construction Equipment. Teacher Edition. Student Edition.

    ERIC Educational Resources Information Center

    Hilley, Robert

    The instructor's guide in this package, which is one in a series of new publications developed to replace the Multistate Academic and Vocational Curriculum Consortium's previous small-engine curricula, contains the materials required to teach a competency-based course in repairing construction equipment. The guide begins with an introduction…

  6. Equipping the Open-Plan School, Equipping for Open Education.

    ERIC Educational Resources Information Center

    Lassiter, Frank

    The performance specifications of furniture and equipment for open education and open-plan schools differ from conventional classroom furniture in that it must be easily moved, have a range of dimensions, contain multipurpose interchangeable components, and be designed to accommodate a variety of student/teacher uses. The author suggests some…

  7. Proposal for capital equipment funds for experiment E-864, an experiment to measure rare composite objects and to carry out high sensitivity searches for novel forms of matter produced in high energy heavy ion collisions. Final report, June 1, 1993 - November 14, 1996

    SciTech Connect

    Sandweiss, J.; Majka, R.

    1997-03-01

    The capital grant for the construction of E-864, the high energy heavy ion experiment at the AGS searching for strangelets and measuring the production of rare composite objects, expired on November 14, 1996. The grant, originally for three years, had been extended twice, each time for six months, to allow a prudent use of the funds. All of the equipment proposed was constructed on schedule and precisely within the budget. The equipment performed at the expected level or in a superior fashion. This equipment, together with other devices supported by funds provided by Brookhaven National Laboratory (BNL) allowed the construction of the E-864 spectrometer and its use in experiment 864. An article is under preparation for Nuclear Instruments and Methods which describes the spectrometer. The report describes work done with this equipment as well as performance of the beam counter system, the hodoscope, the straw tube system, the calorimeter, and the data acquisition system. 6 refs.

  8. Final Report

    SciTech Connect

    Baumgardt, Frank

    2014-01-14

    The equipment developed under this grant provides a solution to convert thermal energy into electricity for heat sources such as geothermal heat or waste heat from industrial processes. In the course of this research effort we developed a series-counterflow configuration for multiple units to increase the efficiency of the conversion process.

  9. Advanced deep sea diving equipment

    NASA Technical Reports Server (NTRS)

    Danesi, W. A.

    1972-01-01

    Design requirements are generated for a deep sea heavy duty diving system to equip salvage divers with equipment and tools that permit work of the same quality and in times approaching that done on the surface. The system consists of a helmet, a recirculator for removing carbon dioxide, and the diver's dress. The diver controls the inlet flow by the recirculatory control valve and is able to change closed cycle operation to open cycle if malfunction occurs. Proper function of the scrubber in the recirculator minimizes temperature and humidity effects as it filters the returning air.

  10. Trends in powder processing equipment

    SciTech Connect

    Sheppard, L.M.

    1993-05-01

    Spray drying is the most widely used process for producing particles. It is used in industries other than ceramics including food, chemicals, and pharmaceutical. The process involves the atomization of a liquid feed stock into a spray of droplets and contacting the droplets with hot air in a drying chamber. The sprays are produced by either rotary or nozzle atomizers. Evaporation of moisture from the droplets and formation of dry particles proceed under controlled temperature and airflow conditions. Powder is then discharged continuously from the drying chamber. Spray drying equipment is being improved to handle an ever-increasing number of applications. Several developments in particle-size reduction equipment are also described.

  11. Steps of Reprocessing and Equipments

    PubMed Central

    Lee, Yong Kook

    2013-01-01

    With the increasing interest in endoscopy and the rising number of endoscopic examinations in hospitals, the importance of endoscopic reprocessing is also increasing. Cure facilities that are understaffed and ill-equipped are trying to cope with the problems of insufficient cleaning and high infection risks. To prevent endoscopy-associated infection, the endoscope cleaning, and disinfection guidelines prepared by the Korean Society of Gastrointestinal Endoscopy must be followed. In this review, the steps of endoscopic reprocessing and the equipments required in each step are discussed. PMID:23767039

  12. Robot Would Reconfigure Modular Equipment

    NASA Technical Reports Server (NTRS)

    Purves, Lloyd R.

    1993-01-01

    Special-purpose sets of equipment, packaged in identical modules with identical interconnecting mechanisms, attached to or detached from each other by specially designed robot, according to proposal. Two-arm walking robot connects and disconnects modules, operating either autonomously or under remote supervision. Robot walks along row of connected modules by grasping successive attachment subassemblies in hand-over-hand motion. Intended application for facility or station in outer space; robot reconfiguration scheme makes it unnecessary for astronauts to venture outside spacecraft or space station. Concept proves useful on Earth in assembly, disassembly, or reconfiguration of equipment in such hostile environments as underwater, near active volcanoes, or in industrial process streams.

  13. Shuttle extravehicular life support equipment

    NASA Technical Reports Server (NTRS)

    Sutton, J. G.

    1973-01-01

    A Shuttle EVA/IVA Requirements Study was conducted by Hamilton Standard for NASA. The objectives of this study were to establish a baseline EVA approach for Shuttle and to prepare requirements for the EVA equipment required to support these operations. This paper presents the results of the EVA life support requirements definition effort and defines candidate configurations which meet these requirements. Various subsystem and system concepts were identified and evaluated to determine the most desirable approaches. Both independent and umbilical configurations are considered. Because certain EVA missions could involve contamination-sensitive payloads, the impact of integrating noncontaminating equipment is also considered.

  14. Equipment

    ERIC Educational Resources Information Center

    Education in Chemistry, 1976

    1976-01-01

    Described are a number of publications and items for use in chemistry. Included are brief descriptions of actuators, thermometer strips, current balances, and a variety of catalogues and other publications. (RH)

  15. Field power measurements of imaging equipment

    SciTech Connect

    McWhinney, Marla; Homan, Gregory; Brown, Richard; Roberson, Judy; Nordman, Bruce; Busch, John

    2004-05-14

    According to the U.S. Department of Energy, electricity use by non-PC commercial office equipment is growing at an annual rate of nearly 5 percent (AEO 2003). To help address this growth in consumption, U.S. EPA periodically updates its ENERGY STAR specifications as products and markets change. This report presents background research conducted to help EPA update the ENERGY STAR specification for imaging equipment, which covers printers, fax machines, copiers, scanners, and multifunction devices (MFDs). We first estimated the market impact of the current ENERGY STAR imaging specification, finding over 90 percent of the current market complies with the specification. We then analyzed a sample of typical new imaging products, including 11 faxes, 57 printers and 19 copiers/MFD. For these devices we metered power levels in the most common modes: active/ready/sleep/off, and recorded features that would most likely affect energy consumption. Our metering indicates that for many products and speed bins, current models consume substantially less power than the current specification. We also found that for all product categories, power consumption varied most considerably across technology (i.e. inkjet vs. laser). Although inkjet printers consumed less energy than laser printers in active, ready and sleep-mode, they consumed more power on average while off, mostly due to the use of external power supplies. Based on these findings, we developed strategies for the ENERGY STAR program to achieve additional energy reductions. Finally, we present an assessment of manufacturer's ENERGY STAR labeling practices.

  16. The SLAC Comparator for the Calibration of Digital Leveling Equipment

    SciTech Connect

    Gassner, G.L.; Ruland, R.E.; /SLAC

    2006-11-07

    At SLAC digital levels are used for precise leveling, both for setting out and monitoring. A very high precision of 30 {micro}m is required, which can only be achieved by regularly calibrating the leveling equipment. The calibration facility is also used for detailed investigations to refine the SLAC leveling procedure. In this paper the setup of the SLAC vertical comparator is described. In order to also perform traditional staff calibration a CCD camera was integrated into the SLAC comparator. Finally an overview of further investigations of our leveling equipment is presented.

  17. 76 FR 71835 - Energy Conservation Program: Energy Conservation Standards for Direct Heating Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... definitions and energy conservation standards for vented gas hearth direct heating equipment. 75 FR 20112. \\1... are excluded from DOE's regulations.'' 75 FR 20112, 20234 (April 16, 2010). In this final rule, DOE is... energy conservation standards for direct heating equipment manufactured on or after April 16, 2013. 75...

  18. 78 FR 79419 - Energy Conservation Program for Consumer Products and Commercial and Industrial Equipment: Effect...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... microwave oven standby and off modes, metal halide lighting fixtures, commercial refrigeration equipment... for microwave oven standby and off modes, commercial refrigeration equipment, walk-in coolers and freezers, metal halide lighting fixtures, and furnace fans. DOE issued a final rule for microwave...

  19. Final Technical Report

    SciTech Connect

    Maxwell, Mike, J., P.E.

    2012-08-30

    The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

  20. Multimedia Equipment for Distance Education.

    ERIC Educational Resources Information Center

    Schiller, Scott S.

    1993-01-01

    Discusses the use of multimedia equipment for distance education. Topics addressed include use of the Internet; distance learning for educators; and cable television and/or fiber optics, including interactive television and satellite technology. A sidebar lists online and telecommunications providers. (LRW)

  1. Computer Equipment Repair Curriculum Guide.

    ERIC Educational Resources Information Center

    Reneau, Fred; And Others

    This guide is intended for use in a course to train students to repair computer equipment and perform related administrative and customer service tasks. Addressed in the individual units are the following topics (with selected subtopics in brackets): performing administrative functions (preparing service bills, maintaining accounts and labor…

  2. Lawn and Garden Equipment Repair.

    ERIC Educational Resources Information Center

    Hardway, Jack; And Others

    This publication is designed to supplement the Comprehensive Small Engine Rapair guide by covering in detail all aspects of lawn and garden equipment repair not included in general engine repair or the repair of other small engines. It consists of instructional materials for both teachers and students, written in terms of student performance using…

  3. Fundamentals of microelectronic equipment design

    NASA Astrophysics Data System (ADS)

    Nenashev, A. P.; Koledov, L. A.

    Microelectronic equipment design is reviewed with reference to general design principles and criteria, role of standardization, design of microcircuit components, and assembly techniques. Particular attention is given to the design of hybrid integrated circuitry and discrete radioelectronic components. Design methods for providing adequate temperature conditions and protection from humidity and mechanical overloads as well as component layout criteria are also discussed.

  4. Using Gaming Equipment to Teach

    ERIC Educational Resources Information Center

    Curriculum Review, 2009

    2009-01-01

    Gaming equipment (such as Nintendo's Wii[TM]) is making its way to schools and classrooms. However, most of the discussion regarding how to use this technology and integrate it into lesson plans is happening in blogs on the Internet. An advocate of interactive media in the classroom, Dr. Dawn Hawkins, a faculty member for the Art Institute of…

  5. Heating and Cooling Equipment Selection

    SciTech Connect

    Not Available

    2002-01-01

    This is one of a series of technology fact sheets created to help housing designers and builders adopt a whole-house design approach and energy efficient design practices. The fact sheet helps people choose the correct equipment for heating and cooling to reduce initial costs, increase homeowner comfort, increase operating efficiency, and greatly reduce utility costs.

  6. Strategy Guideline. HVAC Equipment Sizing

    SciTech Connect

    Burdick, Arlan

    2012-02-01

    This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, FL. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  7. Housing, Home Furnishings, and Equipment.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock. Home Economics Curriculum Center.

    Designed for use in consumer and homemaking education in Texas, this curriculum guide is on the subject of housing, home furnishings, and equipment. An introduction to the guide, covering its use and program and curriculum planning, provides a list of suggested readings. Information on teaching handicapped and disadvantaged students follows. The…

  8. 18 CFR 367.57 - Equipment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Equipment. 367.57... Property Instructions § 367.57 Equipment. (a) The cost of equipment chargeable to the service company property accounts, unless otherwise indicated in the text of an equipment account, includes the related...

  9. 18 CFR 367.57 - Equipment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Equipment. 367.57... Property Instructions § 367.57 Equipment. (a) The cost of equipment chargeable to the service company property accounts, unless otherwise indicated in the text of an equipment account, includes the related...

  10. Energy-related laboratory equipment (ERLE) guidelines

    SciTech Connect

    Not Available

    1995-01-01

    This document describes the Used Energy-Related Laboratory Equipment grants, and eligibility and procedures for participation. The document contains tables identifying typical equipment that may be requested, where to review ERLE equipment lists, and where to mail applications, a description of the eligible equipment grants access data system, and a copy of the ERLE grant application and instructions for its completion and submission.

  11. 46 CFR 197.460 - Diving equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Diving equipment. 197.460 Section 197.460 Shipping COAST... GENERAL PROVISIONS Commercial Diving Operations Periodic Tests and Inspections of Diving Equipment § 197.460 Diving equipment. The diving supervisor shall insure that the diving equipment designated for...

  12. 46 CFR 197.460 - Diving equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Diving equipment. 197.460 Section 197.460 Shipping COAST... GENERAL PROVISIONS Commercial Diving Operations Periodic Tests and Inspections of Diving Equipment § 197.460 Diving equipment. The diving supervisor shall insure that the diving equipment designated for...

  13. 46 CFR 197.460 - Diving equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Diving equipment. 197.460 Section 197.460 Shipping COAST... GENERAL PROVISIONS Commercial Diving Operations Periodic Tests and Inspections of Diving Equipment § 197.460 Diving equipment. The diving supervisor shall insure that the diving equipment designated for...

  14. 46 CFR 197.460 - Diving equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Diving equipment. 197.460 Section 197.460 Shipping COAST... GENERAL PROVISIONS Commercial Diving Operations Periodic Tests and Inspections of Diving Equipment § 197.460 Diving equipment. The diving supervisor shall insure that the diving equipment designated for...

  15. 46 CFR 197.460 - Diving equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Diving equipment. 197.460 Section 197.460 Shipping COAST... GENERAL PROVISIONS Commercial Diving Operations Periodic Tests and Inspections of Diving Equipment § 197.460 Diving equipment. The diving supervisor shall insure that the diving equipment designated for...

  16. 14 CFR 23.1431 - Electronic equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electronic equipment. 23.1431 Section 23... Equipment § 23.1431 Electronic equipment. (a) In showing compliance with § 23.1309(a), (b), and (c) with respect to radio and electronic equipment and their installations, critical environmental conditions...

  17. 14 CFR 23.1431 - Electronic equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electronic equipment. 23.1431 Section 23... Equipment § 23.1431 Electronic equipment. (a) In showing compliance with § 23.1309(a), (b), and (c) with respect to radio and electronic equipment and their installations, critical environmental conditions...

  18. 28 CFR 70.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Equipment. 70.34 Section 70.34 Judicial... Post-Award Requirements Property Standards § 70.34 Equipment. (a) Title to equipment acquired by a... recipient must not use equipment acquired with Federal funds to provide services to non-Federal...

  19. 14 CFR 23.1307 - Miscellaneous equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Miscellaneous equipment. 23.1307 Section 23... AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Equipment General § 23.1307 Miscellaneous equipment. The equipment necessary for an airplane to operate at the maximum operating...

  20. 22 CFR 518.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Equipment. 518.34 Section 518.34 Foreign... Property Standards § 518.34 Equipment. (a) Title to equipment acquired by a recipient with Federal funds... equipment acquired with Federal funds to provide services to non-Federal outside organizations for a...

  1. 20 CFR 435.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 435.34 Section 435.34 Employees...-Award Requirements Property Standards § 435.34 Equipment. (a) Title to equipment acquired by a recipient... may not use equipment acquired with Federal funds to provide services to non-Federal...

  2. 29 CFR 95.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Equipment. 95.34 Section 95.34 Labor Office of the Secretary... Equipment. (a) Title to equipment acquired by a recipient with Federal funds shall vest in the recipient, subject to conditions of this section. (b) The recipient shall not use equipment acquired with...

  3. 27 CFR 19.272 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Equipment. 19.272 Section... THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Construction, Equipment and Security § 19.272 Equipment. The proprietor shall provide equipment suitable for the operations conducted on the distilled...

  4. 15 CFR 14.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 14.34 Section 14.34... ORGANIZATIONS Post-Award Requirements Property Standards § 14.34 Equipment. (a) Title to equipment acquired by a... recipient shall not use equipment acquired with Federal funds to provide services to non-Federal...

  5. 10 CFR 600.134 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Equipment. 600.134 Section 600.134 Energy DEPARTMENT OF... Nonprofit Organizations Post-Award Requirements § 600.134 Equipment. (a) Title to equipment acquired by a... recipient shall not use equipment acquired with Federal funds to provide services to non-Federal...

  6. 45 CFR 2543.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Equipment. 2543.34 Section 2543.34 Public Welfare... Requirements Property Standards § 2543.34 Equipment. (a) Title to equipment acquired by a recipient with... not use equipment acquired with Federal funds to provide services to non-Federal outside...

  7. 14 CFR 25.1307 - Miscellaneous equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Miscellaneous equipment. 25.1307 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1307 Miscellaneous equipment. The following is required miscellaneous equipment: (a) (b) Two or more independent sources of electrical...

  8. 49 CFR 19.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Equipment. 19.34 Section 19.34 Transportation... Requirements Property Standards § 19.34 Equipment. (a) Title to equipment acquired by a recipient with Federal... use equipment acquired with Federal funds to provide services to non-Federal outside organizations...

  9. 14 CFR 27.1307 - Miscellaneous equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Miscellaneous equipment. 27.1307 Section 27... AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment General § 27.1307 Miscellaneous equipment. The following is the required miscellaneous equipment: (a) An approved seat for each occupant. (b) An...

  10. 14 CFR 29.1307 - Miscellaneous equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Miscellaneous equipment. 29.1307 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment General § 29.1307 Miscellaneous equipment. The following is required miscellaneous equipment: (a) An approved seat for each occupant. (b) A master...

  11. 45 CFR 74.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 74.34 Section 74.34 Public Welfare... COMMERCIAL ORGANIZATIONS Post-Award Requirements Property Standards § 74.34 Equipment. (a) Title to equipment... section. (b)(1) The recipient shall not use equipment acquired with HHS funds to provide services to...

  12. 21 CFR 225.130 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 225.130 Section 225.130 Food and Drugs... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Facilities and Equipment § 225.130 Equipment. Equipment shall be capable of producing a medicated feed of intended potency and purity, and shall...

  13. 7 CFR 3019.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment. 3019.34 Section 3019.34 Agriculture....34 Equipment. (a) Title to equipment acquired by a recipient with Federal funds shall vest in the recipient, subject to conditions of this section. (b) The recipient shall not use equipment acquired...

  14. 34 CFR 300.14 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Equipment. 300.14 Section 300.14 Education Regulations... DISABILITIES General Definitions Used in This Part § 300.14 Equipment. Equipment means— (a) Machinery, utilities, and built-in equipment, and any necessary enclosures or structures to house the...

  15. 40 CFR 46.225 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 46.225 Section 46.225... After the Fellowship § 46.225 Equipment. (a) If EPA authorizes you to purchase equipment (see § 46.140(b)) and the equipment retains a fair market value of more than $5,000, you must request...

  16. 30 CFR 57.7002 - Equipment defects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Equipment defects. 57.7002 Section 57.7002... Jet Piercing Drilling-Surface Only § 57.7002 Equipment defects. Equipment defects affecting safety shall be corrected before the equipment is used....

  17. 43 CFR 12.934 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Equipment. 12.934 Section 12.934 Public....934 Equipment. (a) Title to equipment acquired by a recipient with Federal funds shall vest in the recipient, subject to conditions of this section. (b) The recipient shall not use equipment acquired...

  18. 14 CFR 25.1431 - Electronic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electronic equipment. 25.1431 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Miscellaneous Equipment § 25.1431 Electronic equipment. (a) In showing compliance with § 25.1309 (a) and (b) with respect to radio and...

  19. 14 CFR 23.1431 - Electronic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electronic equipment. 23.1431 Section 23... Equipment § 23.1431 Electronic equipment. (a) In showing compliance with § 23.1309(b)(1) and (2) with respect to radio and electronic equipment and their installations, critical environmental conditions...

  20. 14 CFR 23.1431 - Electronic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electronic equipment. 23.1431 Section 23... Equipment § 23.1431 Electronic equipment. (a) In showing compliance with § 23.1309(b)(1) and (2) with respect to radio and electronic equipment and their installations, critical environmental conditions...

  1. 14 CFR 25.1431 - Electronic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electronic equipment. 25.1431 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Miscellaneous Equipment § 25.1431 Electronic equipment. (a) In showing compliance with § 25.1309 (a) and (b) with respect to radio and...

  2. 49 CFR 195.430 - Firefighting equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Firefighting equipment. 195.430 Section 195.430... PIPELINE Operation and Maintenance § 195.430 Firefighting equipment. Each operator shall maintain adequate firefighting equipment at each pump station and breakout tank area. The equipment must be— (a) In...

  3. 49 CFR 195.430 - Firefighting equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Firefighting equipment. 195.430 Section 195.430... PIPELINE Operation and Maintenance § 195.430 Firefighting equipment. Each operator shall maintain adequate firefighting equipment at each pump station and breakout tank area. The equipment must be— (a) In...

  4. 47 CFR 18.203 - Equipment authorization.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT Applications and Authorizations § 18.203 Equipment authorization. (a) Consumer ISM equipment, unless...

  5. 47 CFR 18.203 - Equipment authorization.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT Applications and Authorizations § 18.203 Equipment authorization. (a) Consumer ISM equipment, unless...

  6. 47 CFR 18.203 - Equipment authorization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT Applications and Authorizations § 18.203 Equipment authorization. (a) Consumer ISM equipment, unless...

  7. 47 CFR 18.203 - Equipment authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT Applications and Authorizations § 18.203 Equipment authorization. (a) Consumer ISM equipment, unless...

  8. 47 CFR 18.203 - Equipment authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT Applications and Authorizations § 18.203 Equipment authorization. (a) Consumer ISM equipment, unless...

  9. 14 CFR 23.1561 - Safety equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Safety equipment. 23.1561 Section 23.1561... Markings and Placards § 23.1561 Safety equipment. (a) Safety equipment must be plainly marked as to method of operation. (b) Stowage provisions for required safety equipment must be marked for the benefit...

  10. 40 CFR 160.61 - Equipment design.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 25 2012-07-01 2012-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably...