Science.gov

Sample records for field project annual

  1. Surfactant-enhanced alkaline flooding field project. Annual report, Revision

    SciTech Connect

    French, T.R.

    1991-10-01

    The Tucker sand of Helper (KS) field is a candidate for surfactant-enhanced alkaline flooding. The geology of the Helper site is typical of many DOE Class I reservoirs. The Tucker sand of Helper field was deposited in a fluvial dominated deltaic environment. Helper oil can be mobilized with either chemical system 2 or chemical system 3, as described in this report. Oil fields in the Gulf Coast region are also good candidates for surfactant-enhanced alkaline flooding. The results from laboratory tests conducted in Berea sandstone cores with oil brine from Helper (KS) field are encouraging. The crude oil is viscous and non-acidic and, yet, was mobilized by the chemical formulations described in this report. Significant amounts of the oil were mobilized under simulated reservoir conditions. The results in Berea sandstone cores were encouraging and should be verified by tests with field core. Consumption of alkali, measured with field core, was very low. Surfactant loss appeared to be acceptable. Despite the good potential for mobilization of Helper oil, certain reservoir characteristics such as low permeability, compartmentalization, and shallow depth place constraints on applications of any chemical system in the Tucker sand. These constraints are typical of many DOE Class I reservoirs. Although Hepler field is not a perfect reservoir in which to apply surfactant- enhanced alkaline flooding, Hepler oil is particularly amenable to mobilization by surfactant-enhanced alkaline systems. A field test is recommended, dependent upon final evaluation of well logs and cores from the proposed pilot area. 14 refs., 21 figs., 10 tabs.

  2. Surfactant-enhanced alkaline flooding field project. Annual report

    SciTech Connect

    French, T.R.; Josephson, C.B.

    1993-12-01

    The Tucker sand from Hepler field, Crawford County, Kansas, was characterized using routine and advanced analytical methods. The characterization is part of a chemical flooding pilot test to be conducted in the field, which is classified as a DOE Class I (fluvial-dominated delta) reservoir. Routine and advanced methods of characterization were compared. Traditional wireline logs indicate that the reservoir is vertically compartmentalized on the foot scale. Routine core analysis, X-ray computed tomography (CT), minipermeameter measurement, and petrographic analysis indicate that compartmentalization and lamination extend to the microscale. An idealized model of how the reservoir is probably structured (complex layering with small compartments) is presented. There was good agreement among the several methods used for characterization, and advanced characterization methods adequately explained the coreflood and tracer tests conducted with short core plugs. Tracer and chemical flooding tests were conducted in short core plugs while monitoring with CT to establish flow patterns and to monitor oil saturations in different zones of the core plugs. Channeling of injected fluids occurred in laboratory experiments because, on core plug scale, permeability streaks extended the full length of the core plugs. A graphic example of how channeling in field core plugs can affect oil recovery during chemical injection is presented. The small scale of compartmentalization indicated by plugs of the Tucker sand may actually help improve sweep between wells. The success of field-scale waterflooding and the fluid flow patterns observed in highly heterogeneous outcrop samples are reasons to expect that reservoir flow patterns are different from those observed with short core plugs, and better sweep efficiency may be obtained in the field than has been observed in laboratory floods conducted with short core plugs.

  3. Field fracturing multi-sites project. Annual technical progress report, July 28, 1993--July 31, 1994

    SciTech Connect

    Not Available

    1995-02-01

    The objective of the Field Fracturing Multi-Sites Project (M-Site) is to conduct experiments to definitively determine hydraulic fracture dimensions using remote well and treatment well diagnostic techniques. In addition, experiments will be conducted to provide data which will resolve significant unknowns with regard to hydraulic fracture modeling, fluid fracture rheology and fracture treatment design. These experiments will be supported by a well-characterized subsurface environment, as well as surface facilities and equipment that are conducive to acquiring high-quality data. The goal is to develop a fully characterized, tight reservoir-typical, field-scale hydraulic-fracturing test site.

  4. Field fracturing multi-sites project. Annual report, August 1, 1995--July 31, 1996

    SciTech Connect

    1996-12-31

    The objective of the Field Fracturing Multi-Sites Project (M-Site) is to conduct experiments to definitively determine hydraulic fracture dimensions using remote well and treatment well diagnostic techniques. In addition, experiments are to be conducted to provide data that will resolve significant unknowns with regard to hydraulic fracture modeling, fracture fluid rheology and fracture treatment design. These experiments will be supported by a well-characterized subsurface environment, as well as surface facilities and equipment conducive to acquiring high-quality data. The primary Project goal is to develop a fully characterized, tight reservoir-typical, field-scale hydraulic fracturing test site to diagnose, characterize, and test hydraulic fracturing technology and performance. It is anticipated that the research work being conducted by the multi-disciplinary team of GRI and DOE contractors will lead to the development of a commercial fracture mapping tool/service.

  5. Micellar-polymer joint demonstration project, Wilmington Field, California. Third annual report, June 1978-July 1979

    SciTech Connect

    Staub, H.L.

    1981-08-01

    The micellar-polymer demonstration project to be conducted - through the design phase - in the HXa sand of Wilmington Field is proceeding satisfactorily but has fallen behind schedule. Results of some core floods were unsatisfactory. The recovery efficiencies were much lower than those achieved using the laboratory sample cosurfactant final design slug. Nearly six months of reformulating and additional core testing were required to finally achieve satisfactory laboratory results. Other laboratory tests were performed to optimize the polymer buffer for size and concentration. Other reservoir and reservoir fluid problems have been encountered in production and injection operations during the pre-flush period.

  6. Kalispel Resident Fish Project : Annual Report, 2001.

    SciTech Connect

    Andersen, Todd

    2002-01-01

    In 2001 the Kalispel Natural Resource Department (KNRD) continued assessing habitat and population enhancement projects for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat enhancement measures, as outlined in recommendations from the 1996, 1997, and 1998 annual reports, were monitored during field season 1999, 2000, and 2001. Post assessments were used to evaluate habitat quality, stream morphology and fish populations where enhancement projects were implemented.

  7. SIMBIOS Project 1998 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta, S.

    1999-01-01

    The purpose of this series of technical reports is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Ocean Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant to substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issues by an operational project.

  8. SIMBIOS Project 1999 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    1999-01-01

    The purpose of this technical memorandum is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  9. SIMBIOS Project; 2003 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    2003-01-01

    The purpose of this technical report is to provide current documentation of the the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-99 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.

  10. Kalispel Resident Fish Project : Annual Report, 1997.

    SciTech Connect

    Donley, Christopher; Lockwoood, Jr., Neil

    1997-01-01

    In 1997 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) continued the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat enhancement measures, as outlined in the recommendations from the 1996 annual report, were conducted during field season 1997. Fencing and planting of riparian areas and instream structures were implemented. As a precursor to these enhancement efforts, pre-assessments were conducted to determine the affects of the enhancement. Habitat quality, stream morphology and fish populations were pre-assessed. This season also began the first year of post-assessment monitoring and evaluation of measures implemented during 1996. The largemouth bass hatchery construction was completed in October and the first bass were introduced to the facility that same month. The first round of production is scheduled for 1998.

  11. Test Use Project. Annual Report.

    ERIC Educational Resources Information Center

    Choppin, Bruce H.; And Others

    One of the two major phases of the Test Use Project of the Center for the Study of Evalaution (CSE) is discussed; that is, the collection and analyses of survey data from a national sample of teachers and principals representing the targeted grades/schools. Some historical background influencing that phase of the project is provided. The findings…

  12. Steam Generator Group Project. Annual report, 1982

    SciTech Connect

    Clark, R.A.; Lewis, M.

    1984-02-01

    The Steam Generator Group Project (SGGP) is an NRC program joined by additional sponsors. The SGGP utilizes a steam generator removed from service at a nuclear plant (Surry 2) as a vehicle for research on a variety of safety and reliability issues. This report is an annual summary of progress of the program for 1982. Information is presented on the Steam Generator Examination Facility (SGEF), especially designed and constructed for this research. Loading of the generator into the SGEF is then discussed. The report then presents radiological field mapping results and personnel exposure monitoring. This is followed by information on field reduction achieved by channel head decontaminations. The report then presents results of a secondary side examination through shell penetrations placed prior to transport, confirming no change in generator condition due to transport. Decontamination of the channel head is discussed followed by plans for eddy current testing and removal of the plugs placed during service. Results of a preliminary profilometry examination are then provided.

  13. Project Aloha. Annual Evaluation Report.

    ERIC Educational Resources Information Center

    Berryessa Union Elementary School District, San Jose, CA.

    This program, included in "Effective Reading Programs...," was begun in 1971 and serves 1,826 children of varying socioeconomic levels in K-4. Project ALOHA is a mainland demonstration of the Hawaii English Program, a total instructional system that provides goals, materials, a management system, and inservice training. The program is highly…

  14. Governmental Accounting: Comprehensive Annual Financial Report Project.

    ERIC Educational Resources Information Center

    Moncada, Susan M.

    This paper provides student materials for a course project in which students read, analyze, and interpret the information in an actual comprehensive annual financial report (CAFR) of a government entity (a city with a population greater than 40,000), and is based on the actual reviewer's checklist used by the Government Finance Officers…

  15. Oregon Migrant Health Project, 1971 Annual Report.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    In its 9th year of providing migrant health services through a U.S. Public Health Service Continuing Migrant Health Act grant, this Oregon Migrant Health Project annual report is concerned with (1) the health services provided during the 1970-71 harvest season through a contractual arrangement between the Oregon State Health Division and 10 county…

  16. Oregon Migrant Health Project, 1970 Annual Report.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    The 1970 annual report on the Oregon Migrant Health Project discusses health services for migrant agricultural workers and their families (approximately 30,000 individuals) who worked and lived temporarily in various Oregon counties. As noted, some 9,000 of the 30,000 migrants were estimated to be in need of some type of medical service. Thus, the…

  17. National Writing Project 2009 Annual Report

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2009

    2009-01-01

    Writing as a tool for thinking, learning, and communicating is crucial to academic and career success as well as to active citizenship in a democracy. This annual report of the National Writing Project features teachers of math, chemistry, art, history, and business who develop their students as writers. These educators employ writing to engage…

  18. Detailed evaluation of the West Kiehl alkaline-surfactant-polymer field project and it`s application to mature Minnelusa waterfloods. Annual technical report, January 1993--December 1993

    SciTech Connect

    Pitts, M.J.

    1995-02-01

    The combination of an interfacial tension agent and a mobility control agent has the potential to produce additional oil beyond a waterflood. The West Kiehl alkaline-surfactant-polymer project is the most advanced application of this chemical enhanced oil recovery technique. The West Kiehl alkaline-surfactant-polymer flood was initiated in September 1987 as a secondary application after primary recovery. A preliminary analysis of the West Kiehl alkaline-surfactant-polymer flood indicates that incremental oil of 20% of the original stock tank oil in place will be produced above waterflooding. The cost of the incremental oil will be less than $2.50 per incremental barrel. A statistical analysis of approximately 120 Minnelusa oil fields in the Powder River Basin indicates that the original stock tank oil in place exceeds one billion barrels. If the enhanced oil recovery technology implemented at West Kiehl field could be successfully applied to these fields, the potential incremental oil recovery would approach 200 million barrels. This project (1) evaluates the geological deposition environment of West Kiehl and adjacent Minneluse sand reservoirs; (2) compares the production performance results of the best geologic and reservoir performance analogs and select two fields for future study; (3) compares the two best field analogs to the west Kiehl field using numerical simulation; (4) predict results of applying the enhancement technology on two mature Minneluse waterflood analog units using engineering and numerical simulation; (5) predict waterflood and polymer flood performance of the West Kiehl field using numerical simulation.

  19. Detailed evaluation of the West Kiehl alkaline-surfactant-polymer field project and its application to mature Minnelusa waterfloods. Annual report for the period January 1993--December 1993

    SciTech Connect

    Pitts, M.J.; Surkalo, H.; Mundorf, W.R.

    1994-11-01

    The combination of an interfacial tension agent and a mobility control agent has the potential to produce additional oil beyond a waterflood. The West Kiehl alkaline-surfactant-polymer project is the most advanced application of this chemical enhanced oil recovery technique. The West Kiehl alkaline-surfactant-polymer flood was initiated in September 1987 as a secondary application after primary recovery. A preliminary analysis of the West Kiehl alkaline-surfactant-polymer flood indicates that incremental oil of 20% of the original stock tank oil in place will be produced above waterflooding. The cost of the incremental oil will be less than $2.50 per incremental barrel. A statistical analysis of approximately 120 Minnelusa oil fields in the Powder River Basin indicates that the original stock tank oil in place exceeds one billion barrels. If the enhanced oil recovery technology implemented at West Kiehl field could be successfully applied to these fields, the potential incremental oil recovery would approach 200 million barrels. {open_quotes}Detailed Evaluation of the West Kiehl Alkaline-Surfactant-Polymer Field Project and Its Application to Mature Minnelusa Waterfloods{close_quotes} objective is to evaluate both the field performance of the alkaline-surfactant-polymer enhanced oil recovery technology as well as its potential application to other Minnelusa oil fields.

  20. ENCOAL mild coal gasification project. Annual report

    SciTech Connect

    Not Available

    1993-10-01

    This document is the combination of the fourth quarter report (July--September 1993) and the 1993 annual report for the ENCOAL project. The following pages include the background and process description for the project, brief summaries of the accomplishments for the first three quarters, and a detailed fourth quarter report. Its purpose is to convey the accomplishments and current progress of the project. ENCOAL Corporation, has completed the construction of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basin coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). ENCOAL submitted an application to the US Department of Energy (DOE) in August 1989, soliciting joint funding of the project in the third round of the Clean Coal Technology Program. The project was selected by DOE in December, 1989 and the Cooperative Agreement approved in September, 1990. Construction, commissioning, and start-up of the ENCOAL mild coal gasification facility was completed in June of 1992, and the project is currently in the operations phase. Some plant modifications have been required and are discussed in this report.

  1. Electric Field Imaging Project

    NASA Technical Reports Server (NTRS)

    Wilcutt, Terrence; Hughitt, Brian; Burke, Eric; Generazio, Edward

    2016-01-01

    NDE historically has focused technology development in propagating wave phenomena with little attention to the field of electrostatics and emanating electric fields. This work is intended to bring electrostatic imaging to the forefront of new inspection technologies, and new technologies in general. The specific goals are to specify the electric potential and electric field including the electric field spatial components emanating from, to, and throughout volumes containing objects or in free space.

  2. Alkaline Waterflooding Demonstration Project, Ranger Zone, Long Beach Unit, Wilmington Field, California. Fourth annual report, June 1979-May 1980. Volume 2. Appendix I

    SciTech Connect

    Carmichael, J.D.

    1981-03-01

    This appendix to the 1979-1980 annual report contains basic laboratory test reports, detailed instructions, plans and procedures, and various calculated data derived from operating observations. These are considered to be of sufficient interest to warrant their publication, but because of their bulk, to be of too much detail for inclusion in the body of the report. The table of contents specifies each group of data or description as a section which is believed to be complete in itself. The order of inclusion of the various sections has been dictated by the sequence of their reference in the body of the 1979-1980 annual report.

  3. Ferrocyanide Safety Project: FY 1991 annual report

    SciTech Connect

    Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

    1992-06-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy's Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

  4. Ferrocyanide Safety Project: FY 1991 annual report

    SciTech Connect

    Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

    1992-06-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy`s Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

  5. Projected changes in the annual wind-wave cycle

    NASA Astrophysics Data System (ADS)

    Stopa, Justin; Hemer, Mark

    2016-04-01

    The uneven distribution of the sun's energy directly and indirectly drives physical atmosphere and ocean processes. This creates intricate spatial patterns within the seasonal cycle where higher order harmonics are seen to play an important role in regional climates. The annual cycle and associated harmonics are the strongest oscillations within the climate system and describe the majority of variance across the oceans. Consequently when studying climate oscillations, it is common practice to remove the seasonal cycle in order to elucidate inter-annual cycles. Furthermore the annual cycle plays an important role in the evolution of other inter-annual oscillations through non-linear coupling (e.g ENSO). Despite the important role of the seasons within the climate system very few studies describe the seasonality with any rigor. Therefore our focus is to describe the higher harmonics linked to the annual cycle and how they are expected to evolve in a changing climate. Using simulations from the Coordinated Ocean Wave Climate Project, the seasonality of multiple mid and end of the 21st century wind-wave climate projections are analyzed relative to historical experiment forced simulations. A comparison of various GCM forced wave simulations to reanalysis datasets reveals that a multi-model ensemble best describes the seasons. This ensemble is used to describe the changes within the wave seasonality. A systematic analysis reveals the primary mode of the seasons is relatively unchanged in the mid and end century. The largest changes occur in the second and third modes. The second mode defines the shift or translation within the seasons while the third mode characterizes relative change between the seasonal extremes (ie sharpening or flattening of the waveform). The relative changes in the second and third modes are not homogeneous and intricate patterns are revealed. Certain regions have sharper contrast in seasonality while other regions have a longer strong season. In

  6. Alkaline Waterflooding Demonstration Project, Ranger Zone, Long Beach Unit, Wilmington Field, California. Fourth annual report, June 1979-May 1980. Volume 3. Appendices II-XVII

    SciTech Connect

    Carmichael, J.D.

    1981-03-01

    Volume 3 contains Appendices II through XVII: mixing instructions for sodium orthosilicate; oil displacement studies using THUMS C-331 crude oil and extracted reservoir core material from well B-110; clay mineral analysis of B-827-A cores; sieve analysis of 4 Fo sand samples from B-110-IA and 4 Fo sand samples from B-827-A; core record; delayed secondary caustic consumption tests; long-term alkaline consumption in reservoir sands; demulsification study for THUMS Long Beach Company, Island White; operating plans and instructions for DOE injection demonstration project, alkaline injection; caustic pilot-produced water test graphs; well test irregularities (6/1/79-5/31/80); alkaline flood pump changes (6/1/79-5/31/80); monthly DOE pilot chemical waterflood injection reports (preflush injection, alkaline-salt injection, and alkaline injection without salt); and caustic safety procedures-alkaline chemicals.

  7. Project TRREE 2009-2010 Annual Report

    ERIC Educational Resources Information Center

    Atwell, Nedra

    2010-01-01

    Project TRREE (Teacher Recruitment and Retention for Educational Excellence) is a federally funded project conducted by the Kentucky Department of Education. The purpose of the project is to develop a systemic approach to increase the number of highly qualified special education teachers with a focus on recruitment of linguistically, culturally…

  8. Oregon Migrant Health Project; Annual Progress Report 1969.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    In this 1969 annual report, 10 objectives of the Oregon Migrant Health Project--which served approximately 18,400 migrants during the project year--are listed. These objectives relate to providing for diagnostic and medical services, preventive medical services, and dental care, as well as promoting health awareness, education, and improved living…

  9. Kalispel Resident Fish Project Annual Report, 2003.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2004-04-01

    In 2003 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2003, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented.

  10. Kalispel Resident Fish Project : Annual Report, 2002.

    SciTech Connect

    Andersen, Todd; Olson, Jason

    2003-03-01

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  11. FY 2014 LDRD Annual Report Project Summaries

    SciTech Connect

    Tomchak, Dena

    2015-02-01

    The FY 2014 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support future DOE missions and national research priorities. LDRD is essential to INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enahnces technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development.

  12. Fish & Wildlife Annual Project Summary, 1983.

    SciTech Connect

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  13. LLNL NESHAPs project 1997 annual report

    SciTech Connect

    Gallegos, G.M.

    1998-06-01

    NESHAP`s limits the emission of radionuclides to the ambient air from DOE facilities to levels resulting in an annual effective dose equivalent (EDE) of 10 mrem (100 ({mu}Sv) to any member of the public The EDEs for the Lawrence Livermore National Laboratory (LLNL) site- wide maximally exposed members of the public from 1997 operations were Livermore site. 0 097 mrem (0 97 {mu}Sv) (80% from point-source emissions), 20% from diffuse-source emissions), Site 300 0 014 mrem (O 14 {mu}Sv) (38% from point-source emissions, 62% from diffuse-source emissions) The EDEs were generally calculated using the EPA-approved CAP88-PC air- dispersion/dose-assessment model Site-specific meteorological data, stack flow data, and emissions estimates based on radionuclide inventory data or continuous-monitoring systems data were the specific input to CAP88-PC for each modeled source.

  14. LLNL NESHAPs project. 1992 annual report

    SciTech Connect

    Surano, K.A.; Failor, R.A.; Biermann, A.H.; Berger, R.L.; Harrach, R.J.

    1993-05-01

    This report summarizes work conducted during FY 1992 for the Environmental Monitoring and Analysis Division of the Environmental Protection Department at Lawrence Livermore National Laboratory (LLNL). This document contains information regarding environmental monitoring of a wide variety of radioisotopes which are emitted to the atmosphere. These radioisotopes include transuranics, biomedical tracers, tritium, mixed fission products, and other radioisotopes used for general research and nuclear weapons research. Information regarding radionuclide air emissions for each of the 56 buildings at LLNL where radionuclides are used or activation products occur is given. Detailed information is included for all point source emissions from 43 LLNL site buildings. In addition, dose equivalents and dose assessment are evaluated. Reported annual releases are based on inventory data and unabated EPA potential release fractions for unmonitored sources, and on actual emission measurements for continuously monitored facilities.

  15. Kalispel Resident Fish Project : Annual Report, 2008.

    SciTech Connect

    Andersen, Todd

    2009-07-08

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  16. National Writing Project 2008 Annual Report

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2008

    2008-01-01

    Writing in its many forms is the signature means of communication in the 21st century. This simple truth heightens the urgency to help all of our nation's students become strong writers and effective communicators. The National Writing Project (NWP) pursues this goal by focusing the knowledge, expertise, and leadership of the nation's educators on…

  17. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Annual listing of obligated projects. 450.332 Section 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332...

  18. Annual Energy Outlook 2009 with Projections to 2030

    SciTech Connect

    2009-03-01

    The Annual Energy Outlook 2009 (AEO2009), prepared by the Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA’s National Energy Modeling System (NEMS). EIA published an “early release” version of the AEO2009 reference case in December 2008.

  19. Education North Evaluation Project. The First Annual Report.

    ERIC Educational Resources Information Center

    Ingram, E. J.; McIntosh, R. G.

    The first annual report and evaluation of Education North (a project designed to encourage parents, community members, and teachers in small, isolated, primarily Native and Metis communities in northern Alberta to work together to meet the educational needs of all community members) concentrates on the inner workings of the organizations (local…

  20. Project LIFE Annual Report, September 1, 1972-August 31, 1973.

    ERIC Educational Resources Information Center

    Pfau, Glen S.

    Presented is the annual (contract year 1972-73) report of Project LIFE (Language Improvement to Facilitate Education), a program to develop an instructional system to assist handicapped preschool and elementary aged children to acquire a functional language system. The prime teaching modality of the program is explained to be the filmstrip which…

  1. Basalt Waste Isolation Project. Annual report, fiscal year 1980

    SciTech Connect

    Not Available

    1980-11-01

    During this fiscal year the information available in the fields of geology and hydrology of the Columbia Plateau was consolidated and two reports were issued summarizing this information. In addition, the information on engineered barriers was consolidated and a report summarizing the research to date on waste package development and design of borehole seals was prepared. The waste package studies, when combined with the hydrologic integration, revealed that even under extreme disruptive conditions, a repository in basalt with appropriately designed waste packages can serve as an excellent barrier for containment of radionuclides for the long periods of time required for waste isolation. On July 1, 1980, the first two heater tests at the Near-Surface Test Facility were started and have been successfully operated to this date. The papers on the Near-Surface Test Facility section of this report present the results of the equipment installed and the preliminary results of the testing. In October 1979, the US Department of Energy selected the joint venture of Kaiser Engineers/Parsons Brinckerhoff Quade and Douglas, Inc., to be the architect-engineer to produce a conceptual design of a repository in basalt. During the year, this design has progressed and concept selection has now been completed. This annual report presents a summary of the highlights of the work completed during fiscal year 1980. It is intended to supplement and summarize the nearly 200 papers and reports that have been distributed to date as a part of the Basalt Waste Isolation Project studies.

  2. Kalispel Resident Fish Project : Annual Report, 1995.

    SciTech Connect

    Maroney, Joseph; Donley, Christopher; Scott, Jason; Lockwood, Jr., Neil

    1997-06-01

    In 1995 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) initiated the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat trout (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat and population assessments were conducted in seven tributaries of the Box Canyon reach of the Pend Oreille River. Assessments were used to determine the types and quality of habitat that were limiting to native bull trout and cutthroat trout populations. Assessments were also used to determine the effects of interspecific competition within these streams. A bull trout and brook trout (Salvelinus fontinalis) hybridization assessment was conducted to determine the degree of hybridization between these two species. Analysis of the habitat data indicated high rates of sediment and lack of wintering habitat. The factors that contribute to these conditions have the greatest impact on habitat quality for the tributaries of concern. Population data suggested that brook trout have less stringent habitat requirements; therefore, they have the potential to outcompete the native salmonids in areas of lower quality habitat. No hybrids were found among the samples, which is most likely attributable to the limited number of bull trout. Data collected from these assessments were compiled to develop recommendations for enhancement measures. Recommendations for restoration include riparian planting and fencing, instream structures, as well as, removal of non-native brook trout to reduce interspecific competition with native salmonids in an isolated reach of Cee Cee Ah Creek.

  3. PFBC Utility Demonstration Project. Annual report, 1991

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  4. Pinon Pine Power Project. Annual report, January--December 1994

    SciTech Connect

    1995-01-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project is a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies.

  5. Hangman Restoration Project, Annual Report 2002-2003.

    SciTech Connect

    Coeur d'Alene Tribe

    2003-10-01

    Progress has been made in defining the level of work that needs to be accomplished in the Hangman Watershed in order to restore a viable riparian system and hydrology. The end goal is to use wildlife habitat to protect streams and provide water for instream fish habitats. In order to define the most expedient means of attaining that goal an Instream Flow/Watershed Hydrology Study was initiated. The study is intended to be comprehensive in order to determine the potential of increasing base flow with Hangman Watershed Streams and predict available fish habitats for the range of flow level possibilities. The Study Plan and work for the first field season was contracted and the Plan and end of field season reports are included with this Annual Report. The initial draft of the wildlife portion of the Monitoring and Evaluation Plan was completed and presented to the Columbia Basin Fish and Wildlife Authority Wildlife Committee. The Committee felt that the Basin Hydrology Study needed to be closer to completion before the bulk of wildlife monitoring should be implemented. The extent of the landscape that must be restored in order to facilitate the needed stream flows may not be large enough to affect the population levels of the Plan's target species. The main result of the Committee review of the Monitoring and Evaluation Plan however, was that since the Hangman Restoration Project is not a HU driven wildlife mitigation project than the Wildlife Committee does not have a role to play since their focus is wildlife HU crediting projects. Further work on the wildlife portion of the Monitoring and Evaluation Plan is suspended until the crediting issues surrounding the Hangman Restoration Project are settled. Certain aspects of the Plan, such as the land bird, amphibian, reptile and beaver monitoring can be implemented in the spring of the coming year because monitoring these species and groups needs to be accomplished regardless of crediting status and baseline data is

  6. Field project control. Back to basics

    SciTech Connect

    Douglas, E.E. III )

    1993-10-01

    Computers and critical path method (CPM) software are the tools employed by project planning and scheduling teams to rapidly develop project schedules. It is the analysis of the CPM schedule and the follow-up actions that result in the successful completion of a project. A short duration field construction project is presented in this article which presented an opportunity for a project control engineer to apply a variety of project controls tools and techniques to the total project management effort. 1 ref., 2 figs., 1 tab.

  7. Ferrocyanide safety project ferrocyanide aging studies FY 1995 annual report

    SciTech Connect

    Lilga, M.A.; Alderson, E.V.; Hallen, R.T.

    1995-09-01

    This annual report gives the results of the work conducted by the Pacific Northwest Laboratory in FY 1995 on Task 3 of the Ferrocyanide Safety Project, Ferrocyanide Aging Studies. Aging refers to the dissolution and hydrolysis of simulated Hanford ferrocyanide waste in alkaline aqueous solutions by radiolytic and chemical means. The ferrocyanide simulant primarily used in these studies was dried In-Farm-1B, Rev. 7, prepared by Westinghouse Hanford Company to simulate the waste generated when the In-Farm flowsheet was used to remove radiocesium from waste supernates in single-shell tanks at the Hanford Site. In the In-Farm flowsheet, nickel ion and ferrocyanide anion were added to waste supernates to precipitate sodium nickel ferrocyanide, Na{sub 2}NiFe(CN){sub 6}, and co-precipitate radiocesium. Once the radiocesium was removed, supernates were pumped from the tanks, and new wastes from cladding removal processes or from evaporators were added. These new wastes were typically highly caustic, having hydroxide ion concentrations of over 1 M and as high as 4 M. The Aging Studies task is investigating reactions this caustic waste may have had with the precipitated ferrocyanide waste in a radiation field. In previous Aging Studies research, Na{sub 2}NiFe(CN){sub 6} in simulants was shown to dissolve in basic solutions, forming insoluble Ni(OH){sub 2} and soluble Na{sub 4}Fe(CN){sub 6}. The influence on solubility of base strength, sodium ion concentration, anions, and temperature was previously investigated. The results may indicate that even ferrocyanide sludge that did not come into direct contact with highly basic wastes may also have aged significantly.

  8. SPEEDIER Project. Third Annual Report, 1969-70.

    ERIC Educational Resources Information Center

    Curriculum Study Research and Development Council of South Central Pennsylvania, Palmyra.

    This project was funded under ESEA Title III and four subcontracts with Research for Better Schools. The Title III aspect of the project focused on curriculum change in the fields of language arts, social sciences, and teacher training. Complete reports on each of the following have been included: 1) the Social Studies Pilot Programs as described…

  9. StreamNet Project : Annual Report Fiscal Year 2008.

    SciTech Connect

    Schmidt, Bruce; Roger, Phil; Oftedahl, Lenora

    2008-12-12

    development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project

  10. Pinon pine project. Annual report, January 1995--December 1995

    SciTech Connect

    1996-04-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the U.S. Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit will be designated as Tracy Unit No. 4. SPPCo, the project participant, has contracted with the Foster Wheeler USA Corporation (FW USA) for the overall project management, engineering, procurement and construction of the project. FW USA in turn has subcontracted with The M.W. Kellogg Company (MWK) for the engineering and procurement of key components for the Gasifier Island.

  11. Pinon Pine Power Project. Annual report, August 1992--December 1993

    SciTech Connect

    1994-11-01

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 104 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV.

  12. Umatilla River Subbasin Fish Habitat Improvement Project, 1990 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1991-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation of 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  13. Umatilla Basin Habitat Improvement Project; 1990 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1991-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation OF 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  14. Annual energy outlook 1999, with projections to 2020

    SciTech Connect

    1998-12-01

    The Annual Energy Outlook 1999 (AEO99) presents midterm forecasts of energy supply, demand, and prices through 2020 prepared by the Energy Information Administration (EIA). The projections are based on results from EIA`s National Energy Modeling System (NEMS). The report begins with an Overview summarizing the AEO99 reference case. The next section, Legislation and Regulations, describes the assumptions made with regard to laws that affect energy markets and discusses evolving legislative and regulatory issues. Issues in Focus discusses current energy issues--the economic decline in East Asia, growth in demand for natural gas, vehicle emissions standards, competitive electricity pricing, renewable portfolio standards, and carbon emissions. It is followed by the analysis of energy market trends. The analysis in AEO99 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present a summary of the reference case forecasts in units of oil equivalence and household energy expenditures. The AEO99 projections are based on Federal, State, and local laws and regulations in effect on July 1, 1998. Pending legislation and sections of existing legislation for which funds have not been appropriated are not reflected in the forecasts. Historical data used for the AEOI99 projections were the most current available as of July 31, 1998, when most 1997 data but only partial 1998 data were available.

  15. Annual energy outlook 2006 with projections to 2030

    SciTech Connect

    2006-02-15

    The Annual Energy Outlook 2006 (AEO2006), prepared by the Energy Information Administration (EIA), presents long-term forecasts of energy supply, demand, and prices through 2030. The projections are based on results from EIA's National Energy Modeling System (NEMS). The report begins with an 'Overview' summarizing the AEO2006 reference case and comparing it with the AEO2005 reference case. The next section, 'Legislation and Regulations', discusses evolving legislation and regulatory issues, including recently enacted legislation and regulation, such as the Energy Policy Act of 2005, and some that are proposed. 'Issues in Focus' includes a discussion of the basis of EIA's substantial revision of the world oil price trend used in the projections. Other topics examined include: energy technologies on the cusp of being introduced; mercury emissions control technologies; and U.S. greenhouse gas intensity. 'Issues in Focus' is followed by 'Energy Market Trends', which provides a summary of the AEO2006 projections for energy markets. The analysis in AEO2006 focuses primarily on a reference case, lower and higher economic growth cases, and lower and higher energy price cases. In addition, more than 30 alternative cases are included in AEO2006. Complete tables for the five primary cases are provided in Appendixes A through C. Major results from many of the alternative cases are provided in Appendix D. Appendix E briefly describes NEMS and the alternatives cases. 112 figs., 25 tabs., 7 apps.

  16. Advanced Turbine Technology Applications Project (ATTAP). Annual report 1992

    SciTech Connect

    Not Available

    1993-03-01

    This report summarizes work performed by Garrett Auxiliary Power Division (GAPD), a unit of Allied-Signal Aerospace Company, during calendar year 1992, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the US Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATTAP). GAPD utilized the AGT101 regenerated gas turbine engine developed under the previous DOE/NASA Advanced Gas Turbine (AGT) program as the ATTAP test bed for ceramic engine technology demonstration. ATTAP focussed on improving AGT101 test bed reliability, development of ceramic design methodologies, and improvement of fabrication and materials processing technology by domestic US ceramics fabricators. A series of durability tests was conducted to verify technology advancements. This is the fifth in a series of technical summary reports published annually over the course of the five-year contract.

  17. Umatilla River Subbasin Fish Habitat Improvement Project, 1989 Annual Report.

    SciTech Connect

    Bailey, Timothy D.

    1989-01-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 17 cooperative lease agreements with private landowners, design and layout of 8.6 miles of Riparian enclosure fence and 3.0 miles of instream structures, development of five fencing contracts and six instream work contracts. Results include implementation of 10 miles of fencing and 3 miles of instream work. Other activities undertaken during this report period are: data collection from 90 habitat monitoring transects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of all age groups on habitat improvement and protection.

  18. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    SciTech Connect

    Dena Tomchak

    2014-03-01

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program proves its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.

  19. Annual Report for 2003 Wild Horse Research and Field Activities

    USGS Publications Warehouse

    Ransom, Jason; Singer, Francis J.; Zeigenfuss, Linda C.

    2004-01-01

    This report is meant to highlight the activities of the 2003 field season, as well as to provide a general overview of the data collected. More in-depth data analysis will be conducted following the conclusion of each I phase of the research project, and in many cases will not be possible until several seasons of data are collected.

  20. Annual Energy Outlook 2013 with Projections to 2040

    SciTech Connect

    2013-04-01

    The Annual Energy Outlook 2013 (AEO2013), prepared by the U.S. Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2040, based on results from EIA’s National Energy Modeling System. The report begins with an “Executive summary” that highlights key aspects of the projections. It is followed by a “Legislation and regulations” section that discusses evolving legislative and regulatory issues, including a summary of recently enacted legislation and regulations, such as: Updated handling of the U.S. Environmental Protection Agency’s (EPA) National Emissions Standards for Hazardous Air Pollutants for industrial boilers and process heaters; New light-duty vehicle (LDV) greenhouse gas (GHG) and corporate average fuel economy (CAFE) standards for model years 2017 to 2025; Reinstatement of the Clean Air Interstate Rule (CAIR) after the court’s announcement of intent to vacate the Cross-State Air Pollution Rule (CSAPR); and Modeling of California’s Assembly Bill 32, the Global Warming Solutions Act (AB 32), which allows for representation of a cap-and-trade program developed as part of California’s GHG reduction goals for 2020. The “Issues in focus” section contains discussions of selected energy topics, including a discussion of the results in two cases that adopt different assumptions about the future course of existing policies, with one case assuming the elimination of sunset provisions in existing policies and the other case assuming the elimination of the sunset provisions and the extension of a selected group of existing public policies—CAFE standards, appliance standards, and production tax credits. Other discussions include: oil price and production trends in AEO2013; U.S. reliance on imported liquids under a range of cases; competition between coal and natural gas in electric power generation; high and low nuclear scenarios through 2040; and the impact of growth in natural gas

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  2. Advanced Turbine Technology Applications Project (ATTAP). 1944 Annual report

    SciTech Connect

    1995-06-01

    This report summarizes work performed in development and demonstration of structural ceramics technology for automotive gas turbine engines. At the end of this period, the project name was changed to ``Ceramic Turbine Engine Demonstration Project``, effective Jan. 1995. Objectives are to provide early field experience demonstrating the reliability and durability of ceramic components in a modified, available gas turbine engine application, and to scale up and improve the manufacturing processes for ceramic turbine engine components and demonstrate the application of these processes in the production environment. The 1994 ATTAP activities emphasized demonstration and refinement of the ceramic turbine nozzles in the AlliedSignal/Garrett Model 331-200[CT] engine test bed in preparation for field testing; improvements in understanding the vibration characteristics of the ceramic turbine blades; improvements in critical ceramics technologies; and scaleup of the process used to manufacture ceramic turbine components.

  3. Annual energy outlook 2009 with projections to 2030

    SciTech Connect

    2009-03-15

    The Annual Energy Outlook 2009 (AEO009), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA's National Energy Modeling System (NEMS). EIA published an 'early release' version of the AEO009 reference case in December 2008. The report begins with an 'Executive Summary' that highlights key aspects of the projections. It is followed by a 'Legislation and Regulations' section that discusses evolving legislation and regulatory issues, including a summary of recently enacted legislation, such as the Energy Improvement and Extension Act of 2008 (EIEA2008). The next section, 'Issues in Focus,' contains discussions of selected topics, including: the impacts of limitations on access to oil and natural gas resources on the Federal Outer Continental Shelf (OCS); the implications of uncertainty about capital costs for new electricity generating plants; and the result of extending the Federal renewable production tax credit (PTC). It also discusses the relationship between natural gas and oil prices and the basis of the world oil price and production trends in AEO2009.

  4. Annual energy outlook 1998 with projections to 2020

    SciTech Connect

    1997-12-01

    The Annual Energy Outlook 1998 (AEO98) is the first AEO with projections to 2020. Key issues for the forecast extension are trends in energy efficiency improvements, the effects of increasing production and productivity improvements on energy prices, and the reduction in nuclear generating capacity. Projections in AEO98 also reflect a greater shift to electricity market restructuring. Restructuring is addressed through several changes that are assumed to occur in the industry, including a shorter capital recovery period for capacity expansion decisions and a revised financial structure that features a higher cost of capital as the result of higher competitive risk. Both assumptions tend to favor less capital-intensive generation technologies, such as natural gas, over coal or baseload renewable technologies. The forecasts include specific restructuring plans in those regions that have announced plans. California, New York, and New England are assumed to begin competitive pricing in 1998. The provisions of the California legislation for stranded cost recovery and price caps are incorporated. In New York and New England, stranded cost recovery is assumed to be phased out by 2008.

  5. USDA area-wide project for annual grasses: outcomes and impacts

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This document provides a record of the research, outreach, education and technology transfer that was completed as part of the area-wide project for invasive annual grasses from 2007-2012. The overall goal of the project was to catalyze a holistic integrated management program for invasive annual g...

  6. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits... (OEP) computes and publishes the project cost and annual limits for natural gas pipelines blanket..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy...

  7. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits AGENCY... publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for... CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  8. Phase equilibria modification by electric fields. 1997 annual progress report

    SciTech Connect

    Tsouris, C.; Shah, V.M.

    1997-09-01

    'In this research program, Oak Ridge National Laboratory is investigating the modification of phase equilibria and interface transport enhancement-caused by electric fields. The majority of environmental and waste treatment processes involve complex chemical separations and reactions. The treatment efficiency in such processes is governed by thermodynamic equilibria and transport. The objective of this project is to use electric fields to favorably manipulate the thermodynamic and transport properties of mixtures so that higher separation efficiencies can be achieved. An understanding of the mechanisms of the underlying phenomena of molecular and fluid interactions with electric fields will lead to the development of efficient remediation methods for contaminated natural environments and wastes. Research Statement The main focus of this project is to understand and quantify the influence of electric fields on thermodynamic equilibria and transport properties of fluid mixtures and to determine the conditions and properties of the systems for which this influence is of practical significance. The specific objectives of the project are discussed.'

  9. Fateh Field production facility reconfiguration project

    SciTech Connect

    Dorcheus, S.M.; Landis, S.R.; Robertson, C.A.

    1995-10-01

    Modification of the Dubai Petroleum Co. (DPC) Fateh Field central production facility has reduced wellhead pressures about 10% field-wide, resulting in increased oil production and incremental reserve addition. The facility reconfiguration has reduced operating and maintenance problems experienced with separators and inlet piping, while improving oil recovery. A key challenge of the Reconfiguration Project was to devise a separation scheme which redistributed fluid between vessels, and an installation method which utilized existing equipment to the greatest extent possible, eliminated downtime during facility modification, and minimized investment. Several reconfiguration options were identified and evaluated. The evaluation combined computer simulation results of surface gathering and separation facilities with modeling efforts of the primary Fateh reservoirs. the preferred reconfiguration option was justified on the basis of increased oil uplift associated with the wellhead pressure reduction. The project was successfully completed in mid-January 1994. This paper describes methods used to evaluate the identified options, project planning, and project implementation. Predicted and actual results are given, and key project execution steps are described.

  10. Moses Lake Fishery Restoration Project : FY 2000 Annual Report.

    SciTech Connect

    Burgess, Dave

    2003-02-01

    The Moses Lake Project (project No. 199502800) was first funded during FY 99 and field studies commenced October 2000. Later review of the proposal by the ISRP revealed perceived shortcomings. Immediately following the ISRP review Washington Department of Fish and Wildlife (WDFW) personnel were in contact with the Northwest Power Planning Council (NWPPC) regarding further options. The NWPPC allowed WDFW to re-submit the first proposal revision that was followed in June 2001 by a second negative review by the ISRP. In August 2001, the NWPPC authorized a third and final submission of the proposal and limited funding extension. Therefore, proposal revisions and resubmissions limited progress in data collection and analysis. This report covers work conducted within the submitted scope of work (FY 2000, September 27, 2000--September 26, 2001) and incorporation of the suggested modifications to the proposal. The bulk of the work covered by this report concentrated on data collection.

  11. Annual energy outlook 1997 with projections to 2015

    SciTech Connect

    1996-12-01

    The Annual Energy Outlook 1997 (AEO97) presents midterm forecasts of energy supply, demand, and prices through 2015 prepared by the Energy Information Administration (EIA). These projections are based on results of EIA`s National Energy Modeling System (NEMS). This report begins with a summary of the reference case, followed by a discussion of the legislative assumptions and evolving legislative and regulatory issues. ``Issues in Focus`` discusses emerging energy issues and other topics of particular interest. It is followed by the analysis of energy market trends. The analysis in AEO97 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present summaries of the reference case forecasts in units of oil equivalence and household energy expenditures. Twenty-three other cases explore the impacts of varying key assumptions in NEMS--generally, technology penetration, with the major results shown in Appendix F. Appendix G briefly describes NEMS and the major AEO97 assumptions, with a summary table. 114 figs., 22 tabs.

  12. Annual energy outlook 1995, with projections to 2010

    SciTech Connect

    1995-01-01

    The Annual Energy Outlook 1995 (AEO95) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projections and analyses of energy supply, demand, and prices through 2010, based on results from the National Energy Modeling System (NEMS). Quarterly forecasts of energy supply and demand for 1995 and 1996 are published in the Short-Term Energy Outlook (February 1995). Forecast tables for the five cases examined in the AEO95 are provided in Appendixes A through C. Appendix A gives historical data and forecasts for selected years from 1992 through 2010 for the reference case. Appendix B presents two additional cases, which assume higher and lower economic growth than the reference case. Appendix C presents two cases that assume higher and lower world oil prices. Appendix D presents a summary of the forecasts in units of oil equivalence. Appendix E presents a summary of household energy expenditures. Appendix F provides detailed comparisons of the AEO95 forecasts with those of other organizations. Appendix G briefly describes NEMS and the major AEO95 forecast assumptions. Appendix H presents a stand-alone high electricity demand case. Appendix 1 provides a table of energy conversion factors and a table of metric conversion factors. 89 figs., 23 tabs.

  13. Annual energy outlook 1994: With projections to 2010

    SciTech Connect

    Not Available

    1994-01-01

    The Annual Energy Outlook 1994 (AEO94) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projects and analyses of energy supply, demand, and prices through 2010, based for the first time on results from the National Energy Modeling System (NEMS). NEMS is the latest in a series of computer-based energy modeling systems used over the past 2 decades by EIA and its predecessor organization, the Federal Energy Administration, to analyze and forecast energy consumption and supply in the midterm period (about 20 years). Quarterly forecasts of energy supply and demand for 1994 and 1995 are published in the Short-Term Energy Outlook (February 1994). Forecast tables for 2000, 2005, and 2010 for each of the five scenarios examined in the AEO94 are provided in Appendices A through E. The five scenarios include a reference case and four additional cases that assume higher and lower economic growth and higher and lower world oil prices. Appendix F provides detailed comparisons of the AEO94 forecasts with those of other organizations. Appendix G briefly described the NEMS and the major AEO94 forecast assumptions. Appendix H summarizes the key results for the five scenarios.

  14. Annual energy outlook 2005 with projections to 2025

    SciTech Connect

    2005-02-01

    The Annual Energy Outlook 2005 (AEO2005) presents midterm forecasts of energy supply, demand, and prices through 2025 prepared by the Energy Information Administration (EIA). The projections are based on results from EIA's National Energy Modelling System (NEMS). The report begins with an 'Overview' summarizing the AEO2005 reference case. The next section, 'Legislation and Regulations', discusses evolving legislative and regulatory issues in the USA. Issues in Focus includes discussions on key energy market issues and examines their potential impacts. In particular, it includes a discussion of the world oil price assumptions used in the reference case and four alternative world oil price cases examined in AEO2005. 'Issues in Focus' is followed by 'Market Trends', which provides a summary of energy market trends in the AEO2005 forecast. The analysis in AEO2005 focuses primarily on a reference case, lower and higher economic growth cases, and four alternative oil price cases, a low world oil price case, an October oil futures case, and two high world oil price cases. Forecast tables for those cases are provided in Appendixes A through D. The major results for the alterative cases, which explore the impacts of varying key assumption in NEMS (such as rates of technology penetration), are summarized in Appendix E. Appendix F briefly describes NEMS and the alternative cases. 115 figs., 38 tabs., 8 apps.

  15. Mississippi graduate DOE EPSCor trainee project. [First Annual Summary Report

    SciTech Connect

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  16. Mississippi graduate DOE EPSCor trainee project. First annual summary report

    SciTech Connect

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  17. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2006

    SciTech Connect

    Johnson, Gary E.; Borde, Amy B.; Dawley, Earl; Diefenderfer, Heida L.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Thom, Ronald M.; Vavrinec, John; Whiting, Allan H.

    2007-12-06

    This report is the third annual report of a six-year project to evaluate the cumulative effects of habitat restoration action in the Columbia River Estuary (CRE). The project is being conducted for the U.S. Army Corps of Engineers (Corps) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory, the Pt. Adams Biological Field Station of the National Marine Fisheries Service, and the Columbia River Estuary Study Taskforce. Measurement of the cumulative effects of ecological restoration projects in the Columbia River estuary is a formidable task because of the size and complexity of the estuarine landscape and the meta-populations of salmonids in the Columbia River basin. Despite the challenges presented by this system, developing and implementing appropriate indicators and methods to measure cumulative effects is the best way to enable estuary managers to track the overall effectiveness of investments in estuarine restoration projects. This project is developing methods to quantify the cumulative effects of multiple restoration activities in the CRE. The overall objectives of the 2006 study were to continue to develop techniques to assess cumulative effects, refine the standard monitoring protocols, and initiate development of an adaptive management system for Corps of Engineers’ habitat restoration monitoring efforts in the CRE. (The adaptive management effort will be reported at a later date.) Field studies during 2006 were conducted in tidal freshwater at Kandoll Farm on the lower Grays River and tidal brackish water at Vera Slough on Youngs Bay. Within each of area, we sampled one natural reference site and one restoration site. We addressed the overall objectives with field work in 2006 that, coupled with previous field data, had specific objectives and resulted in some important findings that are summarized here by chapter in this report. Each chapter of the report contains data on particular monitored variables for pre- and post

  18. Annual Energy Outlook 2011 with Projections to 2035

    SciTech Connect

    2011-04-01

    The projections in the Energy Information Administration's (EIA) Annual Energy Outlook 2011 (AEO2011) focus on the factors that shape the U.S. energy system over the long term. Under the assumption that current laws and regulations remain unchanged throughout the projections, the AEO2011 Reference case provides the basis for examination and discussion of energy production, consumption, technology, and market trends and the direction they may take in the future. It also serves as a starting point for analysis of potential changes in energy policies. But AEO2011 is not limited to the Reference case. It also includes 57 sensitivity cases (see Appendix E, Table E1), which explore important areas of uncertainty for markets, technologies, and policies in the U.S. energy economy. Key results highlighted in AEO2011 include strong growth in shale gas production, growing use of natural gas and renewables in electric power generation, declining reliance on imported liquid fuels, and projected slow growth in energy-related carbon dioxide (CO2) emissions even in the absence of new policies designed to mitigate greenhouse gas (GHG) emissions. AEO2011 also includes in-depth discussions on topics of special interest that may affect the energy outlook. They include: impacts of the continuing renewal and updating of Federal and State laws and regulations; discussion of world oil supply and price trends shaped by changes in demand from countries outside the Organization for Economic Cooperation and Development or in supply available from the Organization of the Petroleum Exporting Countries; an examination of the potential impacts of proposed revisions to Corporate Average Fuel Economy standards for light-duty vehicles and proposed new standards for heavy-duty vehicles; the impact of a series of updates to appliance standard alone or in combination with revised building codes; the potential impact on natural gas and crude oil production of an expanded offshore resource base

  19. Kalispell (i.e. Kalispel) Resident Fish Project : Annual Report, 1996.

    SciTech Connect

    Maroney, Joseph; Donley, Christopher; Lockwood, Jr., Neil

    1997-08-01

    In 1996 the Kalispell Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) continued the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). A habitat and population assessment was conducted on Browns Creek a tributary of Cee Cee Ah Creek, one of the priority tributaries outlined in the 1995 annual report. The assessment was used to determine the type and quality of habitat that was limiting to native bull trout and cutthroat trout populations. Analysis of the habitat data indicated high amounts of sediment in the stream, low bank cover, and a lack of winter habitat. Data collected from this assessment was used to prescribe habitat enhancement measures for Browns Creek. Habitat enhancement measures, as outlined in the recommendations from the 1995 annual report, were conducted during field season 1996. Fencing and planting of riparian areas and in stream structures were implemented. As a precursor to these enhancement efforts, pre-assessments were conducted to determine the affects of the enhancement. Habitat quality, stream morphology and fish populations were pre-assessed. The construction of the largemouth bass hatchery was started in October of 1995. The KNRD, Contractors Northwest Inc. and associated subcontractors are in the process of constructing the hatchery. The projected date of hatchery completion is summer 1997.

  20. Phase equilibria modification by electric fields. 1998 annual progress report

    SciTech Connect

    Tsouris, C.

    1998-06-01

    'The objective of this project is to use electric fields to favorably manipulate the thermodynamic and transport properties of mixtures so that higher separation efficiencies can be achieved. The main focus is to understand and quantify the influence of electric fields on vapor-liquid, liquid-liquid, and solid-liquid systems. It is expected that this program will lead to greater separation efficiency in a wide range of environmental treatment processes, including solvent extraction, sorption, distillation, and stripping. Such processes are widely used by DOE for treatment of wastes and sites contaminated with heavy metals, radionuclides, and organic solvents. Particular examples of applications of vapor-liquid- equilibria modification can be found in the separation of volatile organic compounds by either stripping or distillation. Improvements can also be made in liquid-liquid-extraction processes of TRU, Sr, Tc, and Cs by both thermodynamic and transport enhancements.'

  1. Gypsy Field Project in Reservoir Characterization

    SciTech Connect

    John P. Castagna; William J. Lamb; Carlos Moreno; Roger Young; Lynn Soreghan

    2000-09-19

    to make predictions other than by exhaustive trial and error. Alternatively, we use the approach of using principle component analysis to reduce the seismic data to a minimum number of significant attributes that explain the variation in the data. These are then correlated to rock properties in order to make predictions. Part II of the report describe our efforts in optimal attributes as applied to the Gypsy data. (3) High Resolution 3D Seismic Processing: When faced with the issue of testing the above methods on the Gypsy dataset, we realized that the 3D seismic data were not processed well and exhibited poor ties to well control. The data was reprocessed with surface consistent predictive deconvolution, muting of wide-angle reflections, min/max exclusion stacking, and F-XY deconvolution. After reprocessing, a good character match with synthetic seismograms was observed. This work was presented at the 2001 SEG Annual Meeting and is included as Part III of this report. (4) Reservoir Characterization Education: The Gypsy project has provided the data for a reservoir characterization module which was added to Depositional Systems and Stratigraphy, a course required for majors in Geology and Geophysics. This module is important because it introduces students to the relevance of sedimentary geology to applied, real-world problems. This work was presented at the Geological Society of America annual meeting (Part IV) and is described on the website for the course (Part V of the report).

  2. Gypsy Field project in reservoir characterization

    SciTech Connect

    Castagna, John P.; Jr., O'Meara, Daniel J.

    2000-01-12

    The overall objective of this project was to use extensive Gypsy Field Laboratory and data as a focus for developing and testing reservoir characterization methods that are targeted at improved recovery of conventional oil. This report describes progress since project report DOE/BC/14970-7 and covers the period June 1997-September 1998 and represents one year of funding originally allocated for the year 1996. During the course of the work previously performed, high resolution geophysical and outcrop data revealed the importance of fractures at the Gypsy site. In addition, personnel changes and alternative funding (OCAST and oil company support of various kinds) allowed the authors to leverage DOE contributions and focus more on geophysical characterization.

  3. Oak Grove Fork Habitat Improvement Project, 1988 Annual Report.

    SciTech Connect

    Bettin, Scott

    1989-04-01

    The Lower Oak Grove Fork of the Clackamas River is a fifth-order tributary of the Clackamas River drainage supporting depressed runs of coho and chinook salmon, and summer and winter steelhead. Habitat condition rating for the Lower Oak Grove is good, but smelt production estimates are below the average for Clackamas River tributaries. Limiting factors in the 3.8 miles of the Lower Oak Grove supporting anadromous fish include an overall lack of quality spawning and rearing habitat. Beginning in 1986. measures to improve fish habitat in the Lower Oak Grove were developed in coordination with the Oregon Department of Fish and Wildlife (ODF&W) and Portland General Electric (PGE) fisheries biologists. Prior to 1986, no measures had been applied to the stream to mitigate for PGE's storage and regulation of flows in the Oak Grove Fork (Timothy Lake, Harriet Lake). Catchable rainbow trout are stocked by ODF&W two or three times a year during the trout fishing season in the lowermost portion of the Oak Grove Fork near two Forest Service campgrounds (Ripplebrook and Rainbow). The 1987 field season marked the third year of efforts to improve fish habitat of the Lower Oak Grove Fork and restore anadromous fish production. The efforts included the development of an implementation plan for habitat improvement activities in the Lower Oak Grove Fork. post-project monitoring. and maintenance of the 1986 improvement structures. No new structures were constructed or placed in 1987. Fiscal year 1988 brought a multitude of changes which delayed implementation of plans developed in 1987. The most prominent change was the withdrawal of the proposed Spotted Owl Habitat Area (SOHA) which overlapped the Oak Grove project implementation area. Another was the change in the Forest Service biologist responsible for implementation and design of this project.

  4. A Set of Computer Projects for an Electromagnetic Fields Class.

    ERIC Educational Resources Information Center

    Gleeson, Ronald F.

    1989-01-01

    Presented are three computer projects: vector analysis, electric field intensities at various distances, and the Biot-Savart law. Programing suggestions and project results are provided. One month is suggested for each project. (MVL)

  5. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  6. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    NASA Astrophysics Data System (ADS)

    1994-07-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  7. Box Canyon Model Watershed Project : Annual Report 1997/1998.

    SciTech Connect

    Kalispel Natural Resource Department

    1998-01-01

    In 1997, the Kalispel Natural Resource Department (KNRD) initiated the Box Canyon Watershed Project. This project will concentrate on watershed protection and enhancement from an upland perspective and will complement current instream restoration efforts implemented through the Kalispel Resident Fish Project. Primary focus of this project is the Cee Cee Ah Creek watershed due to its proximity to the Reservation, importance as a traditional fishery, and potential for bull trout and west-slope cutthroat trout recovery.

  8. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  9. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  10. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  11. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  12. On Projecting Discretized Electromagnetic Fields with Unstructured Grids

    SciTech Connect

    Lee, Lie-Quan; Candel, Arno; Kabel, Andrea; Li, Zenghai; /SLAC

    2008-08-13

    A new method for projecting discretized electromagnetic fields on one unstructured grid to another grid is presented in this paper. Two examples are used for studying the errors of different projection methods. The analysis shows that the new method is very effective on balancing both the error of the electric field and that of the magnetic field (or curl of the electric field).

  13. Project Directors' Annual Meeting (4th, Washington, D.C., December 1-2, 1988).

    ERIC Educational Resources Information Center

    Chadsey-Rusch, Janis

    The document contains materials relating to the annual meeting of the project directors working with the Secondary Transition Intervention Effectiveness Institute, held December 1-2, 1988. The document includes an agenda, summaries of 10 featured project presentations, summaries of 32 poster sessions, a list of meeting participants, and a…

  14. NREL Solar Radiation Resource Assessment Project: Status and outlook. Annual progress report, FY 1992

    SciTech Connect

    Renne, D.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.; Riordan, C.; Hammond, E.; Ismailidis, T.

    1993-06-01

    This annual report summaries the activities and accomplishments of the Solar Radiation Resource Assessment Project during fiscal year 1992 (1 October to 30 September 1992). Managed by the Analytic Studies Division of the National Renewable Energy Laboratory, this project is the major activity of the US Department of Energy`s Resource Assessment Program.

  15. Interagency Child Abuse Network Project. Annual Report: Innovations in Protective Services.

    ERIC Educational Resources Information Center

    Dennis-Small, Lucretia

    This annual report describes the Interagency Child Abuse Network (ICAN) Project, a joint venture of the Texas Department of Human Services and the Alamo Area Council of Governments in Bexar County. The goal of the ICAN Project was to establish a network of agencies in the county that could develop a team approach to handling child abuse cases. The…

  16. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    SciTech Connect

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  17. Kalispel Resident Fish Project, 2005-2006 Annual Report.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2006-07-01

    In 2005 the Kalispel Natural Resource Department (KNRD) monitored its current enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth Bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in East River and several of its tributaries.

  18. Kalispel Resident Fish Project, 2004-2005 Annual Report.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2005-06-01

    In 2004 the Kalispel Natural Resource Department (KNRD) implemented a new enhancement monitoring project for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in tributaries to the Pend Oreille River.

  19. Project CREATES. First Annual Report 1968-69.

    ERIC Educational Resources Information Center

    Stolurow, Lawrence M.; Klare, George R.

    Project CREATES stands for Combined Resources for Editing Automated Teaching to Enlighten Students, the Harvard University Computer-Aided Instruction Laboratory's part of "A Multi-Agency Developmental Adult Basic Education Program." The major emphases of Project CREATES have been in the area of program and procedure development for computer-aided…

  20. Employment Projections and Program Priorities. AIR 1999 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Rosenthal, Dan; Collier, Kitty

    This study compared occupational projections for Alabama with graduation rates in corresponding academic programs to provide a context for state and institutional policy decisions on new program initiatives and to comply with recent program viability legislation. The study examined number of degrees conferred, employment projections, and…

  1. NREL Energy Storage Projects: FY2013 Annual Report

    SciTech Connect

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  2. Secretary's annual report to Congress. Volume III. Project summaries

    SciTech Connect

    1981-01-01

    Progress and status of representative projects in each program within DOE are summarized. Subjects covered and the number of projects reported on are: conservation (2); fossil energy (11); nuclear energy (5); renewable energy resources (16); energy production and power marketing (3); general science (11); defense programs (7); contingency planning (3); and management and oversight (1). (MCW)

  3. Control of the gray field slug during annual ryegrass establishment

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Weather conditions, in particular soil moisture and soil and air temperature, interact with both crop seedling and slug emergence during the early autumn season. Late, or inadequate autumn rainfall in western Oregon occasionally causes the timing of emergence of newly established annual ryegrass see...

  4. USDA-ARS WHEAT, PEANUT AND FIELD CROPS RESEARCH UNIT ANNUAL REPORT

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This annual report is a summary of objectives and current research accomplishments of the USDA-ARS Wheat, Peanut and Other Field Crops Research Unit, Stillwater, OK, concerning aphids and cereal aphid resistance. Personnel and recent publications are also listed. ...

  5. Deep Vadose Zone–Applied Field Research Initiative Fiscal Year 2012 Annual Report

    SciTech Connect

    Wellman, Dawn M.; Truex, Michael J.; Johnson, Timothy C.; Bunn, Amoret L.; Golovich, Elizabeth C.

    2013-03-14

    This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2012.

  6. Fifteenmile Creek Riparian Buffers Project, Annual Report 2002-2003.

    SciTech Connect

    Graves, Ron

    2004-02-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteenmile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. During this second year of the project, 11 buffer contracts were implemented on 10.9 miles of stream. Buffer widths averaged 132 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.6 years. The total value of contracts established this year is $666,121 compared with $71,115 in Bonneville Power Administration (BPA) contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. In addition, specific outreach efforts targeting the orchard areas of the county began to bear fruit with orchardists sign-ups as the project year ended. Progress this second year of project includes only work accomplished in the Fifteenmile subbasin. A similar but separate effort to implement buffers in the Columbia Plateau Province was initiated during the year under project number 2002-019-00. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion.

  7. Wasco Riparian Buffer Project, Annual Report 2003-2004.

    SciTech Connect

    Graves, Ron

    2003-07-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Deschutes River Sub-basin Summary, March 2, 2001. This project is providing the technical planning support needed to implement at least 20 riparian buffer system contracts on approximately 800 acres covering an estimated 36 miles of anadromous fish streams. During this second year of implementation, 17 buffer contracts were established on 173,462 ft. of stream (25.9 miles). Acreage included in the buffers totaled 891.6 acres. Average buffer width was 112 ft. on each side of the stream. Cumulative totals through the first two project years are 26 buffers on 36.6 stream miles covering 1,283.6 acres. Actual implementation costs, lease payments, and maintenance costs will be borne by existing USDA programs: Conservation Reserve (CRP) and Conservation Reserve Enhancement Programs (CREP). The lease period of each contract may vary from 10 to 15 years. During this year, the average lease period was 14.9 years. The total value of contracts established this year is $1,421,268 compared with $55,504 in BPA contract costs to provide the technical support needed to get the contracts implemented. Cumulative contract value for the first two years is $1,919,451 compared to $103,329 cost to BPA. This project provides technical staffing to conduct assessments and develop conservation plans required for riparian buffer systems to help keep pace with a growing backlog of potential buffer projects. This project meets a critical need in the lower Deschutes and lower John Day River basins and complements the Riparian Buffer project approved for Fifteenmile watershed, Project No. 2001-021-00 begun in fiscal year 2001. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion and benefits the mid-Columbia ESU of steelhead.

  8. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    SciTech Connect

    Not Available

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  9. Advanced Gas Turbine (AGT) Technology Development Project annual report

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This report is the tenth in a series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Carborundum Company, and AiResearch Casting Company. The Project is administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report covers plans and progress for the period July 1, 1984 through June 30, 1985.

  10. Pataha [Creek] Model Watershed : 1997 Habitat Projects : Annual Progress Report.

    SciTech Connect

    Bartels, Duane

    1998-10-28

    The projects outlined in detail on the attached project reports are a few of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. Up until this year, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and was the main focus of the implementation phase of the watershed plan. These practices are the main focus of the watershed plan to reduce the majority of the sediment entering the stream.

  11. Magma Energy Research Project, FY80 annual progress report

    SciTech Connect

    Colp, J.L.

    1982-04-01

    The technical feasibility of extracting energy from magma bodies is explored. Five aspects of the project are studied: resource location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction.

  12. Magma energy research project, FY80 annual progress report

    NASA Astrophysics Data System (ADS)

    Colp, J. L.

    1982-04-01

    The technical feasibility of extracting energy from magma bodies is explored. Five aspects of the project are studied: resource location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction.

  13. UAS Integration in the NAS Project - FY 14 Annual Review

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Randall, Debra; Hackenberg, Davis

    2014-01-01

    This briefing gives insight into the research activities and efforts being executed in order to integrate unmanned aircraft systems into the national airspace system. This briefing is to inform others of the UAS-NAS Projects progress and future directions.

  14. Nez Perce Tribal Hatchery Project, 1999 Annual Report.

    SciTech Connect

    Johnson, David B.; Larson, Roy Edward; Walker, Grant W.

    2001-08-17

    This report consists of activities/events conducted in response to the Objectives and Tasks described in the 1999 contract Statement Of Work for the Planning and Planning and Design (P and D) and Maintenance (O and M) activities of the Nez Perce Tribal Hatchery (NPTH). The report follows the format of the contract for ease in finding accomplishments. Although specific emphasis will be placed on activities related directly to the NPTH, activities from other artificial production related projects might also be noted because of overlap in staff duties and production facilities. Additionally, the project leader's role has evolved as other Tribal fisheries projects have been developed and assigned to the Production Division, Department of Fisheries Resource Management (DFRM), and Nez Perce Tribe (NPT). Thus, implementation of the project leader role for the NPTH actually entails specific duties of the Production Division Director and the Production Division Coordinator, as well as the Hatchery Division Coordinator.

  15. Grande Ronde Basin Fish Habitat Enhancement Project : 1998 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Powell, Russ M.

    1999-05-01

    The primary goal of ''The Grande Ronde Basin Fish Habitat Improvement Project'' is to access, create, improve, protect, and restore reparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin.

  16. Project Quinte annual report, 1993. Monitoring report No. 5. Annual publication

    SciTech Connect

    1995-12-31

    This report reviews the activities of Project Quinte, a long-term multi-agency research and monitoring project whose objectives include studying, comparing, and evaluating the Bay of Quinte limnological attributes (biological, physical, and chemical) before and after phosphorus control was implemented at municipal sewage treatment plans. The project also monitors long-term ecosystem responses within the Bay. The report includes papers summarizing research on such topics as phosphorus loadings, hydrology and sediment monitoring, nutrients and phytoplankton, toxic contaminant modeling, benthic fauna, fish populations, and wastewater toxicity.

  17. John Day Watershed Restoration Projects, annual report 2003.

    SciTech Connect

    Brown, Linda

    2004-01-01

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional

  18. Pend Oreille Wetlands Wildlife Mitigation Projects, 2001 Annual Report.

    SciTech Connect

    Entz, Ray D.

    2001-12-05

    The Pend Oreille Wetlands project consists of two adjacent parcels totaling about 600 acres. The parcels make up the northern boundary of the Kalispel Indian Reservation, and is also adjacent to the Pend Oreille River about 25 miles north of Newport and Albeni Falls Dam (Figure 1). Located in the Selkirk Mountains in Pend Oreille County Washington, the project is situated on an active floodplain, increasing its effectiveness as mitigation for Albeni Falls Dam. The combination of the River, wetlands and the north-south alignment of the valley have resulted in an important migratory waterfowl flyway. Washington Department of Fish and Wildlife and Kalispel Natural Resource Department have designated both project sites as priority habitats. Seven habitat types exist on the project properties and include four wetland habitats (open water, emergent, and scrub-shrub and forested), riparian deciduous forest, upland mixed coniferous forest and floodplain meadow. Importance of the project to wildlife is further documented by the occurrence of an active Bald Eagle nest aerie.

  19. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    SciTech Connect

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  20. Fifteenmile Basin Habitat Improvement Project: 1990 Annual Report.

    SciTech Connect

    Asbridge, Gary M.

    1993-12-01

    U.S.D.A. Forest Service activities in the Fifteenmile basin during 1990 involved the placement of 84 log structures in a two mile reach of Fifteenmile Creek (RM 45.4-47.4) by a combination of falling trees into the channel, bucking in blowdown trees spanning the creek, and winching in existing blowdown and log segments from newly fallen trees. The primary project objective on Fifteenmile Creek was to increase physical habitat diversity and rearing habitat for age l+ winter steelhead trout. USFS personnel also conducted spring spawning surveys in sections of Ramsey and Eightmile Creeks, physical habitat pre-project monitoring in the above project reach, water temperature monitoring, and macroinvertebrate sampling.

  1. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    SciTech Connect

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  2. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are

  3. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

    2001-04-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect

  4. FY2003 LDRD Final Annual Report Article: Pathogen Pathway Project

    SciTech Connect

    Fitch, J P; McCutchen-Maloney, S L

    2003-11-10

    Understanding virulence mechanisms of bacterial pathogens is vital to anticipating biological threats and to improving detectors, vaccines, and treatments. This project will characterize factors responsible for virulence of Yersinia pestis, the causative agent of plague and a biothreat agent, which has an inducible Type III secretion virulence mechanism also found in other animal, plant, and human pathogens. Our approach relies on genomic and proteomic characterization of Y. pestis in addition to a bioinformatic infrastructure. Scientific and technical capabilities developed in this project can be applied to other microbes of interest. This work will establish a significant new direction for biodefense at LLNL and expand our national and international scientific collaborations.

  5. Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report

    SciTech Connect

    Wellman, Dawn M.; Johnson, Timothy C.; Smith, Ronald M.; Truex, Michael J.; Matthews, Hope E.

    2011-10-01

    This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative

  6. Pacific Lamprey Research and Restoration Project : Annual Report 2000.

    SciTech Connect

    Close, David A.

    2002-11-01

    This report summarizes results of research activities conducted in 1999-2000. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin.

  7. Texas State Department of Health Migrant Project. Annual Report 1971.

    ERIC Educational Resources Information Center

    Texas State Dept. of Health Resources, Austin.

    The Texas Migrant Health Project under the State Department of Health aims to: (1) promote and improve medical, dental, and public health services for the domestic agricultural worker and his dependents and (2) encourage and support migrant efforts to participate in and be responsible for personal and family health. During 1969-70, the state was…

  8. Program Improvement Project for Industrial Education. Annual Report.

    ERIC Educational Resources Information Center

    Shaeffer, Bruce W.

    Designed to improve industrial education programs through the development of minimum uniform quality standards, a project developed a task list, educationally sequenced the identified tasks, and developed a recommended shop layout and equipment list for four occupational areas: diesel repair, appliance repair, office machine repair, and small…

  9. Rural Women Proprietorship Project. Research and Development Annual Report.

    ERIC Educational Resources Information Center

    Hazard Community Coll., KY.

    A project was created to provide individualized and technical training specially designed for women who desired to become small business owners. Recruitment of eastern Kentucky women in the Hazard Community College five-county service area was done through direct mailing; posting of flyers; and newspaper, radio, and television publicity. In…

  10. Nez Perce Tribal Hatchery Project, 1998 Annual Report.

    SciTech Connect

    Johnson, David B.; Larson, Roy Edward; Walker, Grant W.

    2000-01-27

    This report consists of activities/events conducted in response to the Objectives and Tasks described in the 1998 contract Statement Of Work for the Planning and Predesign activities of the Nez Perce Tribal Hatchery (NPTH). The report follows the format of the contract for ease in finding accomplishments. Although specific emphasis will be placed on activities related directly to the NPTH, activities from other artificial production related projects may also be noted because of overlap in staff duties and production facilities. Additionally, the project leader's role has evolved as other Tribal fisheries projects have been developed and assigned to the Production Services Division, Department of Fisheries Resource Management (DFRM), Nez Perce Tribe (NPT). Thus, implementation of the project leader role for the NPTH actually entails specific duties of the Hatchery Supervisor, the Production Coordinator as well as the Production Director. The Production Director, Ed Larson was absent mos t of January and part of February before he began working part time from home while recovering from back surgery.

  11. Single Parent Project. Annual Report, 1990. Continuation Proposal.

    ERIC Educational Resources Information Center

    Eastern Washington Univ., Cheney.

    The Single Parent Project (SPP) at Eastern Washington University assists single parents on public assistance who are working toward an academic degree in order to become independent from the welfare system. The SPP provides campus-based services that help students succeed in an academic setting. Four areas of focus for the SPP are: (1) direct…

  12. Vocational Education Evaluation Project: Annual Report--Fiscal Year 1973.

    ERIC Educational Resources Information Center

    Oliver, J. Dale; And Others

    The primary objective of the Vocational Education Evaluation Project (VEEP) is to develop a management information system for the planning and programing of vocational education. The work has been divided into a macro-system (primarily concerned with guidelines and systematic procedures at the State level) and a micro-system (emphasizing the…

  13. Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Morton, Winston H.

    2009-07-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state

  14. Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Morton, Winston H.

    2008-12-30

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by

  15. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  16. Fifteenmile Basin Habitat Enhancement Project: Annual Report FY 1988.

    SciTech Connect

    Smith, Roger C.; Marx, Steven D.

    1989-04-01

    The goal of the Fifteenmile Creek Habitat Enhancement Project is to improve wild winter steelhead in the Fifteenmile Creek Basin under the Columbia River Basin Fish and Wildlife Program. The project is funded by through the Bonneville Power Administration. Cooperators in the habitat enhancement project include the USDA Forest Service, Wasco County Soil and Water Conservation District and the Confederated Tribes of the Warms Springs. Installation of instream fish habitat structures was completed on four miles of Ramsey Creek and on one mile of Fifteenmile Creek. One hundred thirty-five structures were installed in treatment areas. Construction materials included logs and rock. Riparian protection fencing was completed on Dry Creek and Ramsey Creek worksites. Five and one-half miles of new fence was added to existing fence on Ramsey Creek to afford riparian protection to four miles of stream. Six miles of stream on Dry Creek will be afforded riparian protection by constructing 4.5 miles of fence to complement existing fence. 2 refs., 5 figs.

  17. Kalispel Non-Native Fish Suppression Project 2007 Annual Report.

    SciTech Connect

    Wingert, Michele; Andersen, Todd

    2008-11-18

    Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi) populations. In 2007, the Kalispel Natural Resource Department (KNRD) initiated the Kalispel Nonnative Fish Suppression Project. The goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT). Lower Graham Creek was invaded by non-native rainbow (Oncorhynchus mykiss) and brook trout (Salvelinus fontinalis) after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2008, a fish management structure (barrier) was constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek. The construction of the barrier was preceded by intensive electrofishing in the lower 700 m to remove and relocate all captured fish. Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with a piscicide to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds. In 2004, the Washington Department of Fish and Wildlife (WDFW) proposed an antimycin treatment within the subbasin; the project encountered significant public opposition and was eventually abandoned. However, over the course of planning this 2004 project, little public

  18. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    SciTech Connect

    Allee, Brian J.

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  19. 24 CFR 880.503 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Maximum annual commitment and project account. 880.503 Section 880.503 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  20. 24 CFR 883.604 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Maximum annual commitment and project account. 883.604 Section 883.604 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  1. 24 CFR 880.503 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Maximum annual commitment and project account. 880.503 Section 880.503 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  2. 24 CFR 880.503 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Maximum annual commitment and project account. 880.503 Section 880.503 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  3. 24 CFR 883.604 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maximum annual commitment and project account. 883.604 Section 883.604 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  4. 24 CFR 883.604 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Maximum annual commitment and project account. 883.604 Section 883.604 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  5. 24 CFR 880.503 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maximum annual commitment and project account. 880.503 Section 880.503 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  6. 24 CFR 883.604 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Maximum annual commitment and project account. 883.604 Section 883.604 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  9. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  10. Title I ESEA Projects: Digest of Annual Evaluations. Supplementary Edition 1976-77. Report No. 77131.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    This digest provides a historical summary of the key findings reported in the annual evaluations of each of the Philadelphia, Pennsylvania school district's Title I, Elementary and Secondary Education Act projects since 1975. The 1976-1977 management information, the 1975-1976 key findings, and the preliminary findings for 1976-1977 are presented.…

  11. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    SciTech Connect

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  12. Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

    SciTech Connect

    Soults, Scott

    2009-08-05

    The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

  13. NREL Energy Storage Projects. FY2014 Annual Report

    SciTech Connect

    Pesaran, Ahmad; Ban, Chunmei; Burton, Evan; Gonder, Jeff; Grad, Peter; Jun, Myungsoo; Keyser, Matt; Kim, Gi-Heon; Neubauer, Jeremy; Santhanagopalan, Shriram; Saxon, Aron; Shi, Ying; Smith, Kandler; Sprague, Michael; Tenent, Robert; Wood, Eric; Yang, Chuanbo; Zhang, Chao; Han, Taeyoung; Hartridge, Steve; Shaffer, Christian E.

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Battery Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.

  14. FY2011 Annual Report for NREL Energy Storage Projects

    SciTech Connect

    Pesaran, A.; Ban, C.; Dillon, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Lee, K. J.; Long, D.; Neubauer, J.; Santhangopalan, S.; Smith, K.

    2012-04-01

    This report describes the work of NREL's Energy Storage group for FY2011. The National Renewable Energy Laboratory (NREL) supports energy storage R&D under the Vehicle Technologies Program at the U.S. Department of Energy (DOE). The DOE Energy Storage program's charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation's goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are: (1) Advanced Battery Development [through the United States Advanced Battery Consortium (USABC)]; (2) Testing, Design and Analysis (TDA); (3) Applied Battery Research (ABR); and (4) Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT). In FY11, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL's R&D projects in FY11 in support of the USABC, TDA, ABR, and BATT program elements. In addition, we continued the enhancement of NREL's battery testing facilities funded through the American Reinvestment and Recovery Act (ARRA) of 2009. The FY11 projects under NREL's Energy Storage R&D program are briefly described below. Each of these is discussed in depth in the main sections of this report.

  15. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  16. Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

    SciTech Connect

    Patterson, Scott

    2009-04-10

    Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an

  17. FY2011 Annual Report for the Actinide Isomer Detection Project

    SciTech Connect

    Warren, Glen A.; Francy, Christopher J.; Ressler, Jennifer J.; Erikson, Luke E.; Tatishvili, Gocha; Hatarik, R.

    2011-10-01

    This project seeks to identify a new signature for actinide element detection in active interrogation. This technique works by exciting and identifying long-lived nuclear excited states (isomers) in the actinide isotopes and/or primary fission products. Observation of isomers in the fission products will provide a signature for fissile material. For the actinide isomers, the decay time and energy of the isomeric state is unique to a particular isotope, providing an unambiguous signature for SNM. This project entails isomer identification and characterization and neutron population studies. This document summarizes activities from its third year - completion of the isomer identification characterization experiments and initialization of the neutron population experiments. The population and decay of the isomeric state in 235U remain elusive, although a number of candidate gamma rays have been identified. In the course of the experiments, a number of fission fragment isomers were populated and measured [Ressler 2010]. The decays from these isomers may also provide a suitable signature for the presence of fissile material. Several measurements were conducted throughout this project. This report focuses on the results of an experiment conducted collaboratively by PNNL, LLNL and LBNL in December 2010 at LBNL. The measurement involved measuring the gamma-rays emitted from an HEU target when bombarded with 11 MeV neutrons. This report discussed the analysis and resulting conclusions from those measurements. There was one strong candidate, at 1204 keV, of an isomeric signature of 235U. The half-life of the state is estimated to be 9.3 {mu}s. The measured time dependence fits the decay time structure very well. Other possible explanations for the 1204-keV state were investigated, but they could not explain the gamma ray. Unfortunately, the relatively limited statistics of the measurement limit, and the lack of understanding of some of the systematic of the experiment, limit

  18. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    SciTech Connect

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  19. Hydrogen engine performance analysis project. Second annual report

    SciTech Connect

    Adt, Jr., R. R.; Swain, M. R.; Pappas, J. M.

    1980-01-01

    Progress in a 3 year research program to evaluate the performance and emission characteristics of hydrogen-fueled internal combustion engines is reported. Fifteen hydrogen engine configurations will be subjected to performance and emissions characterization tests. During the first two years, baseline data for throttled and unthrottled, carburetted and timed hydrogen induction, Pre IVC hydrogen-fueled engine configurations, with and without exhaust gas recirculation (EGR) and water injection, were obtained. These data, along with descriptions of the test engine and its components, the test apparatus, experimental techniques, experiments performed and the results obtained, are given. Analyses of other hydrogen-engine project data are also presented and compared with the results of the present effort. The unthrottled engine vis-a-vis the throttled engine is found, in general, to exhibit higher brake thermal efficiency. The unthrottled engine also yields lower NO/sub x/ emissions, which were found to be a strong function of fuel-air equivalence ratio. (LCL)

  20. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    SciTech Connect

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  1. Albeni Falls Wildlife Mitigation Project, 2001 Annual Report.

    SciTech Connect

    Terra-Burns, Mary

    2002-02-11

    The Albeni Falls Interagency Work Group was actively engaged in implementing wildlife mitigation activities in 2001. The Work Group met quarterly to discuss management and budget issues affecting the Albeni Falls Wildlife Mitigation Program. Work Group members protected 851 acres of wetland habitat in 2001. Wildlife habitat protected to date for the Albeni Falls project is approximately 5,248.31 acres ({approx}4,037.48 Habitat Units). Approximately 14% of the total wildlife habitat lost has been mitigated. Administrative activities increased as funding was more evenly distributed among Work Group members and protection opportunities became more time consuming. In 2001, Work Group members focused on development and implementation of the monitoring and evaluation program as well as completion of site-specific management plans. With the implementation of the monitoring and evaluation program, and as management plans are reviewed and executed, on the ground management activities are expected to increase in 2002.

  2. FY2010 Annual Report for the Actinide Isomer Detection Project

    SciTech Connect

    Warren, Glen A.; Francy, Christopher J.; Ressler, Jennifer J.; Erikson, Luke E.; Miller, Erin A.; Hatarik, R.

    2011-01-01

    This project seeks to identify a new signature for actinide element detection in active interrogation. This technique works by exciting and identifying long-lived nuclear excited states (isomers) in the actinide isotopes and/or primary fission products. Observation of isomers in the fission products will provide a signature for fissile material. For the actinide isomers, the decay time and energy of the isomeric state is unique to a particular isotope, providing an unambiguous signature for Special Nuclear Materials (SNM). Future work will include a follow-up measurement scheduled for December 2010 at LBNL. Lessons learned from the July 2010 measurements will be incorporated into these new measurements. Analysis of both the July and December experiments will be completed in a few months. A research paper to be submitted to a peer-reviewed journal will be drafted if the conclusions from the measurements warrant publication.

  3. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  4. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    SciTech Connect

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  5. Fifteenmile Basin Habitat Enhancement Project: Annual Report FY 1990.

    SciTech Connect

    Smith, Roger C.; Brown, Lawrence F.

    1990-03-31

    The goal of the Fifteenmile Creek Habitat Improvement project is to improve wild winter steelhead habitat in the Fifteenmile Creek Basin. This goal was addressed under the Columbia River Basin Fish and Wildlife Program, Measure 703 (c) (1) - Action Item 4.2. Construction of fish habitat structures was completed on approximately 3.5 miles of Eightmile Creek and on approximately 8.5 miles of Fifteenmile Creek. A total of 15,435 yds of rock was placed to improve rearing and spawning habitat, and to improve water quality and reduce siltation. Riparian protection fencing was completed on 1.8 miles of Dry Creek, approximately 1.75 miles on Eightmile Creek, and 4.75 miles on Fifteenmile Creek. Approximately 10 miles of stream will receive protection from the 8 miles of new fencing installed and 6.5 miles of abandoned fence repaired. Irrigation withdrawal screens were installed at six irrigation pump withdrawals. These screens functioned satisfactorily during the irrigation season. Physical and biological monitoring of stream flows, water temperature, and macro-invertebrate communities was conducted.

  6. SELECTIVE CATALYTIC REDUCTION MERCURY FIELD SAMPLING PROJECT

    EPA Science Inventory

    A lack of data still exists as to the effect of selective catalytic reduction (SCR), selective noncatalytic reduction (SNCR), and flue gas conditioning on the speciation and removal of mercury (Hg) at power plants. This project investigates the impact that SCR, SNCR, and flue gas...

  7. High Intensity Radiated Fields (HIRF) project plan

    NASA Astrophysics Data System (ADS)

    Glynn, Michael S.; Blair, Jerry T.; Hintze, M. Marx

    1991-09-01

    Addressed here is the Federal Aviation Administration's approach to High Intensity Radiated Fields (HIRF) affecting the aviation community. Near- and far-term tasks are described. Deliverables, program management, scheduling, and cost issues are discussed.

  8. Surfactant-enhanced alkaline flooding field project

    SciTech Connect

    French, T.R.

    1991-10-01

    The Tucker sand of Helper (KS) field is a candidate for surfactant-enhanced alkaline flooding. The geology of the Helper site is typical of many DOE Class I reservoirs. The Tucker sand of Helper field was deposited in a fluvial dominated deltaic environment. Helper oil can be mobilized with either chemical system 2 or chemical system 3, as described in this report. Oil fields in the Gulf Coast region are also good candidates for surfactant-enhanced alkaline flooding. The results from laboratory tests conducted in Berea sandstone cores with oil brine from Helper (KS) field are encouraging. The crude oil is viscous and non-acidic and, yet, was mobilized by the chemical formulations described in this report. Significant amounts of the oil were mobilized under simulated reservoir conditions. The results in Berea sandstone cores were encouraging and should be verified by tests with field core. Consumption of alkali, measured with field core, was very low. Surfactant loss appeared to be acceptable. Despite the good potential for mobilization of Helper oil, certain reservoir characteristics such as low permeability, compartmentalization, and shallow depth place constraints on applications of any chemical system in the Tucker sand. These constraints are typical of many DOE Class I reservoirs. Although Hepler field is not a perfect reservoir in which to apply surfactant- enhanced alkaline flooding, Hepler oil is particularly amenable to mobilization by surfactant-enhanced alkaline systems. A field test is recommended, dependent upon final evaluation of well logs and cores from the proposed pilot area. 14 refs., 21 figs., 10 tabs.

  9. Healy Clean Coal Project 1993 annual progress report

    SciTech Connect

    Not Available

    1994-06-01

    The primary objective of the HCCP is to demonstrate a new power plant design integrating an advanced combustor and heat recovery system coupled with both high and low temperature emission control processes. The parties anticipate that, if the demonstration project is successful, the technology will be commercialized in the late 1990s and be capable of (1) achieving significant reductions in the emissions of sulfur dioxide and the oxides of nitrogen from existing facilities, (2) providing for future energy needs in an environmentally acceptable manner. Alaskan bituminous and subbituminous coals will be the fuels. Emissions of SO{sub 2}, and NO{sub x}, from the plant will be controlled using TRW`s slagging coal combustor with limestone injection, in conjunction with a boiler supplied by Foster Wheeler. Further SO{sub 2}, and particulate removal will be accomplished using Joy Technologies, Inc.`s (Joy) Activated Recycle Spray Absorber System. Successful demonstration of these technologies is expected to result in NO{sub x}, emissions of less than 0.2 lb/MMBtu and SO{sub 2}, removal efficiencies greater than 90 percent. The heart of the system being demonstrated is a combustion system. Each combustor consists of two cylindrical sections followed by a short duct that connects the combustor to the boiler. A precombustor burns about 35 percent of the coal to preheat the main combustor secondary air. The preheated air enters the main combustor section tangentially to impart a swirling motion to the coal and air. The balance of the coal is injected axially through multiple injection ports at the front end of this cylindrical section.

  10. Columbia River: Terminal fisheries research project. 1994 Annual report

    SciTech Connect

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  11. Adiabatic and isocurvature perturbation projections in multi-field inflation

    NASA Astrophysics Data System (ADS)

    Gordon, Chris; Saffin, Paul M.

    2013-08-01

    Current data are in good agreement with the predictions of single field inflation. However, the hemispherical asymmetry, seen in the cosmic microwave background data, may hint at a potential problem. Generalizing to multi-field models may provide one possible explanation. A useful way of modeling perturbations in multi-field inflation is to investigate the projection of the perturbation along and perpendicular to the background fields' trajectory. These correspond to the adiabatic and isocurvature perturbations. However, it is important to note that in general there are no corresponding adiabatic and isocurvature fields. The purpose of this article is to highlight the distinction between a field redefinition and a perturbation projection. We provide a detailed derivation of the evolution of the isocurvature perturbation to show that no assumption of an adiabatic or isocurvature field is needed. We also show how this evolution equation is consistent with the field covariant evolution equations for the adiabatic perturbation in the flat field space limit.

  12. Pacific Lamprey Research and Restoration Project : Annual Report 1999.

    SciTech Connect

    Close, David A.

    2001-10-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  13. Modular Pebble Bed Reactor Project, University Research Consortium Annual Report

    SciTech Connect

    Petti, David Andrew

    2000-07-01

    This project is developing a fundamental conceptual design for a gas-cooled, modular, pebble bed reactor. Key technology areas associated with this design are being investigated which intend to address issues concerning fuel performance, safety, core neutronics and proliferation resistance, economics and waste disposal. Research has been initiated in the following areas: · Improved fuel particle performance · Reactor physics · Economics · Proliferation resistance · Power conversion system modeling · Safety analysis · Regulatory and licensing strategy Recent accomplishments include: · Developed four conceptual models for fuel particle failures that are currently being evaluated by a series of ABAQUS analyses. Analytical fits to the results are being performed over a range of important parameters using statistical/factorial tools. The fits will be used in a Monte Carlo fuel performance code, which is under development. · A fracture mechanics approach has been used to develop a failure probability model for the fuel particle, which has resulted in significant improvement over earlier models. · Investigation of fuel particle physio-chemical behavior has been initiated which includes the development of a fission gas release model, particle temperature distributions, internal particle pressure, migration of fission products, and chemical attack of fuel particle layers. · A balance of plant, steady-state thermal hydraulics model has been developed to represent all major components of a MPBR. Component models are being refined to accurately reflect transient performance. · A comparison between air and helium for use in the energy-conversion cycle of the MPBR has been completed and formed the basis of a master’s degree thesis. · Safety issues associated with air ingress are being evaluated. · Post shutdown, reactor heat removal characteristics are being evaluated by the Heating-7 code. · PEBBED, a fast deterministic neutronic code package suitable for

  14. Density field projection analysis in search for WHIM

    NASA Astrophysics Data System (ADS)

    Liivamägi, Lauri Juhan

    2014-05-01

    We study the possibilities of using line-of-sight projected luminosity density and filament probability fields to find the best locations in the sky to attempt to observe the elusive Warm-Hot Intergalactic Matter (WHIM). We calculate galaxy luminosity fields on a regular grid and then project those to the plane of sky. Column densities are then found by integrating along multiple lines of sight. We also create the projections of the filament probability fields. The results are presented as sky maps of the potentially suitable areas and the corresponding fractions of sky coverage.

  15. DOE tallies Class III oil recovery field projects

    SciTech Connect

    Not Available

    1994-07-25

    Here are details from midterm proposals submitted as part of the US Department of Energy's Class 3 oil recovery field demonstration candidate projects. All of the proposals emphasize dissemination of project details so that the results, if successful, can be applied widely in similar reservoirs. Project results will also be fed into a national petroleum technology transfer network. The proposals include: Gulf of Mexico, Gulf coast, offshore California, a California thermal, immiscible CO[sub 2], produced/potable water, microbial EOR, California diatomite, West Texas Spraberry field, and other Permian Basin fields.

  16. FIELD DEMONSTRATION AND QUALITY ASSURANCE PROJECT PLAN

    EPA Science Inventory

    The Demonstration of innovative field devices for the measurement of mercury in soil and sediment is being conducted under the EPA's SITE Program in February 2003 at the United States Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee and th...

  17. Annual report for 2004 wild horse research and field activities

    USGS Publications Warehouse

    Ransom, Jason; Singer, Francis J.; Zeigenfuss, Linda; Coates-Markle, Linda

    2005-01-01

    The Bureau of Land Management (BLM) and U.S. Geological Survey-Biological Resources Discipline (USGS/BRD) continued wild horse research in 2004, investigating the strategic research elements of fertility control and population estimation. Fertility control research was focused on the individual-based porcine zonae pellucid (PZP) field trials at the Pryor Mountain Wild Horse Range (WHR), Little Rock Cliffs WHR, and McCullough Peaks Wild Horse Management Area (WHMA). Aerial population estimation research was conducted on a number of western wild horse herds to test different survey techniques as applied to various habitat types and population sizes.

  18. Field Review of Fish Habitat Improvement Projects in Central Idaho.

    SciTech Connect

    Beschta, Robert L.; Griffith, Jack; Wesche, Thomas A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho.

  19. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    SciTech Connect

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  20. Field Initiated Studies Program: Abstracts of Funded Projects, 1993.

    ERIC Educational Resources Information Center

    Office of Educational Research and Improvement (ED), Washington, DC. Office of Research.

    Projects funded in 1993 as part of the Field-Initiated Studies program of the U.S. Department of Education are described, including information on research objective, project design, principal investigators, amount of award, and report availability. Program titles and locations of principal investigator are: "Promoting Equity in Teacher Education…

  1. Field development projects advance in Norwegian Sea

    SciTech Connect

    Vielvoye, R.

    1992-03-30

    This paper reports on the Norwegian Sea, lying between the Norwegian North Sea and the western flank of the Barents Sea, which is set to become Norway's second oil and gas producing province. Oil is scheduled to start to flow near the end of next year when AS Norske Shell places on production 428 million bbl Draugen field in Block 6407/9, about 60 miles off the coast of mid-Norway in the frontier sea area known as Haltenbanken. Two years later, in 1995, Norske Conoco AS will add to the 95,000 b/d from Draugen when it commissions the world's first concrete hull tension leg platform (TLP) in Heidrun field. The TLP is expected to produce 200,000 b/d of oil and move associated gas by pipeline to the Norwegian mainland to feed a worldscale methanol plant planned for construction at Tjeldbergodden. The Norwegian government also has been asked to approve a gas pipeline link between Haltenbanken and the gas export infrastructure in the North Sea.

  2. Environmental Field Surveys, EMF Rapid Program, Engineering Project No.3

    SciTech Connect

    Enertech Consultants

    1996-04-01

    The EMF Research and Public Information Dissemination Program (RAPID) includes several engineering research in the area of exposure assessment and source characterization. RAPID engineering project No. 3: ''Environmental Field Surveys'' was performed to obtain information on the levels and characteristics of different environments, for which only limited data were available, especially in comparison to magnetic field data for the residential environment and for electric utility facilities, such as power lines and substations. This project was also to provide information on the contribution of various field sources in the surveyed environments. Magnetic field surveys were performed at four sites for each of five environments: schools, hospitals, office buildings, machine shops, and grocery stores. Of the twenty sites surveyed, 11 were located in the San Francisco Bay Area and 9 in Massachusetts. The surveys used a protocol based on magnetic field measurements and observation of activity patterns, designed to provide estimates of magnetic field exposure by type of people and by type of sources. The magnetic field surveys conducted by this project produced a large amount of data which will form a part of the EMF measurement database Field and exposure data were obtained separately for ''area exposure'' and ''at exposure points''. An exposure point is a location where persons engage in fixed, site specific activities near a local source that creates a significant increase in the area field. The area field is produced by ''area sources'', whose location and field distribution is in general not related to the location of the people in the area.

  3. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  4. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  5. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1996-10-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

  6. POISON SPIDER FIELD CHEMICAL FLOOD PROJECT, WYOMING

    SciTech Connect

    Douglas Arnell; Malcolm Pitts; Jie Qi

    2004-11-01

    A reservoir engineering and geologic study concluded that approximate 7,852,000 bbls of target oil exits in Poison Spider. Field pore volume, OOIP, and initial oil saturation are defined. Potential injection water has a total dissolved solids content of 1,275 mg/L with no measurable divalent cations. If the Lakota water consistently has no measurable cations, the injection water does not require softening to dissolve alkali. Produced water total dissolved solids were 2,835 mg/L and less than 20 mg/L hardness as the sum of divalent cations. Produced water requires softening to dissolve chemicals. Softened produced water was used to dissolve chemicals in these evaluations. Crude oil API gravity varies across the field from 19.7 to 22.2 degrees with a dead oil viscosity of 95 to 280 cp at 75 F. Interfacial tension reductions of up to 21,025 fold (0.001 dyne/cm) were developed with fifteen alkaline-surfactant combinations at some alkali concentration. An additional three alkaline-surfactant combinations reduced the interfacial tension greater than 5,000 fold. NaOH generally produced the lowest interfacial tension values. Interfacial tension values of less than 0.021 dyne/cm were maintained when the solutions were diluted with produced water to about 60%. Na{sub 2}CO{sub 3} when mixed with surfactants did not reduce interfacial tension values to levels at which incremental oil can be expected. NaOH without surfactant interfacial tension reduction is at a level where some additional oil might be recovered. Most of the alkaline-surfactant-polymer solutions producing ultra low interfacial tension gave type II- phase behavior. Only two solutions produced type III phase behavior. Produced water dilution resulted in maintenance of phase type for a number of solutions at produced water dilutions exceeding 80% dilution. The average loss of phase type occurred at 80% dilution. Linear corefloods were performed to determine relative permeability end points, chemical

  7. WATERSHED MANIPULATION PROJECT: FIELD IMPLEMENTATION PLAN FOR 1986-1989

    EPA Science Inventory

    The Field Implementation Plan (FIP) of the Watershed Manipulation Project (WMP) has been developed for the Bear Brook Watershed in Maine (BBWM). This document provides details on field activities for site and task groups for the period 1986 to October 1989. pecific objectives of ...

  8. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... removal of a project, if the United States does not take over a project and no new power or nonpower... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of...

  9. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    SciTech Connect

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  10. Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report

    SciTech Connect

    Crowson, D.; Gibson, J.D.; Haase, C.S.; Holt, R.; Hyndman, D.; Krumhansl, J.; Lauffer, F.; McCord, J.P.; McCord, J.T.; Neel, D.

    1993-10-01

    The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Act (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.

  11. Colville Confederated Tribes' Performance Project Wildlife Mitigation Acquisitions, Annual Report 2006.

    SciTech Connect

    Whitney, Richard; Berger, Matthew; Tonasket, Patrick

    2006-12-01

    The Colville Confederated Tribes Wildlife Mitigation Project is protecting lands as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. The Mitigation Project protects and manages 54,606 acres for the biological requirements of managed wildlife species that are important to the Colville Tribes. With the inclusion of 2006 acquisitions, the Colville Tribes have acquired approximately 32,018 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. This annual report for 2006 briefly describes that four priority land acquisitions that were considered for enrollment into the Colville Tribes Mitigation Project during the 2006 contract period.

  12. UNOCAL Parachute Creek Shale Oil Project. Monitoring review committee meeting report. Annual meeting, 1987-1988

    SciTech Connect

    Not Available

    1988-05-25

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The support agreement included development of an Environmental Monitoring Plan incorporating existing compliance monitoring and twenty-two supplemental monitoring points for water, air, solid waste, worker health and safety, and socio-economic impacts during the period 1986-1993. A Monitoring Review Committee (MRC) comprised of representatives from the Project, U.S. Department of Treasury, U.S. Department of Energy, U.S. Environmental Protection Agency, and the state convene each year to discuss monitoring information and trends in environmental and health surveillance. This report documents the first annual MRC meeting, held at the Project.

  13. IGCC repowering project clean coal II project public design report. Annual report, October 1992--September 1993

    SciTech Connect

    1993-10-01

    Combustion Engineering, Inc. (CE) is participating in a $270 million coal gasification combined cycle repowering project that was designed to provide a nominal 60 MW of electricity to City, Water, Light and Power (CWL&P) in Springfield, Illinois. The Integrated Gasification Combined Cycle (IGCC) system consists of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-BTU gas; and all necessary coal handling equipment, The project is currently completing the second budget period of five. The major activities to date are: (1) Establishment of a design, cost, and schedule for the project; (2) Establishment of financial commitments; (3) Acquire design and modeling data; (4) Establishment of an approved for design (AFD) engineering package; (5) Development of a detailed cost estimate; (6) Resolution of project business issues; (7) CWL&P renewal and replacement activities; and (8) Application for environmental air permits. A Project Management Plan was generated, The conceptual design of the plant was completed and a cost and schedule baseline for the project was established in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities were accomplished, including the Air Permit Application, completion of the National Environmental Policy Act process, and the draft Environmental Monitoring Plan. At the end of 1992 the DOE requested that Duke Engineering and Services Inc., (DESI) be used to complete the balance of plant cost estimate. DESI was retained to do this work, DESI completed the material take off estimate and included operations, maintenance, and startup in the estimate.

  14. National health expenditure projections: modest annual growth until coverage expands and economic growth accelerates.

    PubMed

    Keehan, Sean P; Cuckler, Gigi A; Sisko, Andrea M; Madison, Andrew J; Smith, Sheila D; Lizonitz, Joseph M; Poisal, John A; Wolfe, Christian J

    2012-07-01

    For 2011-13, US health spending is projected to grow at 4.0 percent, on average--slightly above the historically low growth rate of 3.8 percent in 2009. Preliminary data suggest that growth in consumers' use of health services remained slow in 2011, and this pattern is expected to continue this year and next. In 2014, health spending growth is expected to accelerate to 7.4 percent as the major coverage expansions from the Affordable Care Act begin. For 2011 through 2021, national health spending is projected to grow at an average rate of 5.7 percent annually, which would be 0.9 percentage point faster than the expected annual increase in the gross domestic product during this period. By 2021, federal, state, and local government health care spending is projected to be nearly 50 percent of national health expenditures, up from 46 percent in 2011, with federal spending accounting for about two-thirds of the total government share. Rising government spending on health care is expected to be driven by faster growth in Medicare enrollment, expanded Medicaid coverage, and the introduction of premium and cost-sharing subsidies for health insurance exchange plans. PMID:22692089

  15. Projected increases in the annual flood pulse of the Western Amazon

    NASA Astrophysics Data System (ADS)

    Zulkafli, Zed; Buytaert, Wouter; Manz, Bastian; Véliz Rosas, Claudia; Willems, Patrick; Lavado-Casimiro, Waldo; Guyot, Jean-Loup; Santini, William

    2016-01-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research because of its rich biodiversity and the significant role of rainforests in carbon cycling. Climate change has also a direct hydrological impact, and increasing efforts have focused on understanding the hydrological dynamics at continental and subregional scales, such as the Western Amazon. New projections from the Coupled Model Inter-comparison Project Phase 5 ensemble indicate consistent climatic warming and increasing seasonality of precipitation in the Peruvian Amazon basin. Here we use a distributed land surface model to quantify the potential impact of this change in the climate on the hydrological regime of the upper Amazon river. Using extreme value analysis, historical and future projections of the annual minimum, mean, and maximum river flows are produced for a range of return periods between 1 and 100 yr. We show that the RCP 4.5 and 8.5 scenarios of climate change project an increased severity of the wet season flood pulse (7.5% and 12% increases respectively for the 100 yr return floods). These findings agree with previously projected increases in high extremes under the Special Report on Emissions Scenarios climate projections, and are important to highlight due to the potential consequences on reproductive processes of in-stream species, swamp forest ecology, and socio-economy in the floodplain, amidst a growing literature that more strongly emphasises future droughts and their impact on the viability of the rainforest system over greater Amazonia.

  16. The NASA Seasonal-to-Interannual Prediction Project (NSIPP). [Annual Report for 2000

    NASA Technical Reports Server (NTRS)

    Rienecker, Michele; Suarez, Max; Adamec, David; Koster, Randal; Schubert, Siegfried; Hansen, James; Koblinsky, Chester (Technical Monitor)

    2001-01-01

    The goal of the project is to develop an assimilation and forecast system based on a coupled atmosphere-ocean-land-surface-sea-ice model capable of using a combination of satellite and in situ data sources to improve the prediction of ENSO and other major S-I signals and their global teleconnections. The objectives of this annual report are to: (1) demonstrate the utility of satellite data, especially surface height surface winds, air-sea fluxes and soil moisture, in a coupled model prediction system; and (2) aid in the design of the observing system for short-term climate prediction by conducting OSSE's and predictability studies.

  17. Pinon Pine Power Project. Annual report, January 1--December 31, 1996

    SciTech Connect

    1997-12-31

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit is designated as Tracy Unit No. 4.

  18. Hellsgate Big Game Winter Range Wildlife Mitigation Project : Annual Report 2008.

    SciTech Connect

    Whitney, Richard P.; Berger, Matthew T.; Rushing, Samuel; Peone, Cory

    2009-01-01

    The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. At present, the Hellsgate Project protects and manages 57,418 acres (approximately 90 miles2) for the biological requirements of managed wildlife species; most are located on or near the Columbia River (Lake Rufus Woods and Lake Roosevelt) and surrounded by Tribal land. To date we have acquired about 34,597 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. In addition to the remaining 1,237 HUs left unmitigated, 600 HUs from the Washington Department of Fish and Wildlife that were traded to the Colville Tribes and 10 secure nesting islands are also yet to be mitigated. This annual report for 2008 describes the management activities of the Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) during the past year.

  19. Annual Report 2007 Multi-state research project on "Irrigation Management for Humid and Sub-Humid Areas" S1018.

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This report summarizes the annual results from scientists at the Application and Production Technology Research Unit in Stoneville, as members of the multi-state research project on irrigation and water management S1018. The multi-state research project has four key objectives, three of which the St...

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    SciTech Connect

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    SciTech Connect

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Klenk, David P.

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    SciTech Connect

    West Valley Environmental Services LLC and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner, II, Robert E.; Fox, James R.; Hoch, Jerald J.; Werchowski, Rebecca L.

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  6. Annual Progress Report Fish Research Project Oregon : Project title, Evaluation of Habitat Improvements -- John Day River.

    SciTech Connect

    Olsen, Erik A.

    1984-01-01

    This report summarizes data collected in 1983 to evaluate habitat improvements in Deer, Camp, and Clear creeks, tributaries of the John Day River. The studies are designed to evaluate changes in abundance of spring chinook and summer steelhead due to habitat improvement projects and to contrast fishery benefits with costs of construction and maintenance of each project. Structure types being evaluated are: (1) log weirs, rock weirs, log deflectors, and in stream boulders in Deer Creek; (2) log weirs in Camp Creek; and (3) log weir-boulder combinations and introduced spawning gravel in Clear Creek. Abundance of juvenile steelhead ranged from 16% to 119% higher in the improved (treatment) area than in the unimproved (control) area of Deer Creek. However, abundance of steelhead in Camp Creek was not significantly different between treatment and control areas. Chinook and steelhead abundance in Clear Creek was 50% and 25% lower, respectively in 1983, than the mean abundance estimated in three previous years. The age structure of steelhead was similar between treatment and control areas in Deer and Clear creeks. The treatment area in Camp Creek, however, had a higher percentage of age 2 and older steelhead than the control. Steelhead redd counts in Camp Creek were 36% lower in 1983 than the previous five year average. Steelhead redd counts in Deer Creek were not made in 1983 because of high streamflows. Chinook redds counted in Clear Creek were 64% lower than the five year average. Surface area, volume, cover, and spawning gravel were the same or higher than the corresponding control in each stream except in Deer Creek where there was less available cover and spawning gravel in sections with rock weirs and in those with log deflectors, respectively. Pool:riffle ratios ranged from 57:43 in sections in upper Clear Creek with log weirs to 9:91 in sections in Deer Creek with rock weirs. Smolt production following habitat improvements is estimated for each stream

  7. Overview of the GASP project; Field applications and economics

    SciTech Connect

    Sarshar, M.M.; Lovie, P.M. )

    1992-03-01

    This paper reports that the aim of the Goodfellow Assocs. subsea production (GASP) project was to develop a subsea production system for use in the development of marginal oil fields. The project was divided into three phases that culminated in testing a prototype system in a dry dock. The GASP system enables manifolding of products, separation of gas from produced liquids, and transportation of gas and liquids, and transportation of gas and liquids through separate lines. The produced liquids are pumped with a single-phase pumping system that is highly modularized for ease of installation and retrieval of key components. GASP is suitable for deepwater application and development of marginal fields far from the host platform. The economics were assessed with probabilistic methods to weigh the uncertainties. Developing marginal fields with the GASP system looks attractive, offering a development cost of $2.50 to $5.50 per barrel in many typical instances.

  8. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    SciTech Connect

    Contor, Craig R.; Harris, Robin; King, Marty

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  9. Blast furnace granular coal injection project. Annual report, January--December 1995

    SciTech Connect

    1995-05-01

    This annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to employ British Steel technology that uses granular coal to provide part of the fuel requirement of blast furnaces. The project will demonstrate/assess a broad range of technical/economic issues associated with the use of coal for this purpose. To achieve the program objectives, the demonstration project is divided into the following three Phases: (1) Phase I - Design. (2) Phase II - Construction. (3) Phase III - Operation. Preliminary Design (Phase I) began in 1991 with detailed design commencing in 1993. Construction at Burns Harbor (Phase II) began in August 1993 and was completed at the end of 1994. The demonstration test program (Phase III) started in the fourth quarter of 1995.

  10. Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1993

    SciTech Connect

    Not Available

    1994-02-01

    This report presents the annual hydrogeologic evaluation of 20 Resource Conservation and Recovery Act of 1976 groundwater monitoring projects and 1 nonhazardous waste facility at the US Department of Energy`s Hanford Site. Most of the projects no longer receive dangerous waste; a few projects continue to receive dangerous waste constituents for treatment, storage, or disposal. The 20 RCRA projects comprise 30 waste management units. Ten of the units are monitored under groundwater quality assessment status because of elevated levels of indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration, distribution, and rate of migration are evaluated. Groundwater is monitored at the other 20 units to detect contamination, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1992 and September 1993. Recent groundwater quality is also described for the 100, 200, 300, and 600 Areas and for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

  11. Riparian Buffer Project : Annual Report for the Period April 1, 2001 to March 31, 2002.

    SciTech Connect

    Wasco County Soil and Water Conservation District

    2002-01-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteen mile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. In the first year of implementation, 26 buffer contracts were established on 25-26 miles of stream. This nearly doubled the annual goal. Buffer widths averaged 83 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.5 years. The total value of contracts established this year is $1,491,235 compared with $64,756 in BPA contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. More than half of the contracts this year have been done in the Hood and Fifteen mile sub-basins with additional contracts in adjacent sub-basins.

  12. Projected increases in the annual flood pulse of the western Amazon

    NASA Astrophysics Data System (ADS)

    Zulkafli, Zed; Buytaert, Wouter; Manz, Bastian; Veliz Rosas, Claudia; Willems, Patrick; Lavado-Casimiro, Waldo; Guyot, Jean-Loup; Santini, William

    2016-04-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research due to its rich biodiversity and the significant role of rain forest in carbon cycling. Climate change has also direct hydrological impact, and there have been increasing efforts to understand such dynamics at continental and subregional scales such as the scale of the western Amazon. New projections from the Coupled Model Inter- comparison Project Phase 5 (CMIP5) ensemble indicate consistent climatic warming and increasing seasonality of precipitation in the Peruvian Amazon basin. Here we use a distributed land surface model to quantify the potential impact of this change in the climate on the hydrological regime of the river. Using extremes value analysis, historical and future projections of the annual minimum, mean, and maximum river flows are produced for a range of return periods between 1 and 100 years. We show that the RCP 4.5 and 8.5 scenarios of climate change project an increased severity of the wet season flood pulse (7.5% and 12% increases respectively for the 100- year return floods). These findings are in agreement with previously projected increases in high extremes under the Special Report on Emissions Scenarios (SRES) climate projections, and are important to highlight due to the potential consequences on reproductive processes of in-stream species, swamp forest ecology, and socio-economy in the floodplain, amid a growing literature that more strongly emphasises future droughts and their impact on the viability of the rain forest system over the greater Amazonia.

  13. West Hackberry Tertiary Project. Annual report, September 3, 1997--September 2, 1998

    SciTech Connect

    Gillham, T.H.

    1997-09-10

    The following report is the Project Management Plan for the fifth year of the West Hackberry Tertiary Project. The West Hackberry Tertiary Project is one of four mid-term projects selected by the United States Department of Energy (DOE) as part of the DOE`s Class 1 Program for the development of advance recovery technologies in fluvial dominated deltaic reservoirs. The West Hackberry Tertiary Project is a field test of the idea that air injection can be combined with the Double Displacement Process to produce a low cost tertiary recovery process which is economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. The Double Displacement Process is based upon the concept that in fields such as West Hackberry waterdrive recoveries are typically 50%-60% of the original oil in place while gravity drainage recoveries average 80%-90% of the original oil in place. Therefore, by injecting a gas into a watered out reservoir, a gas cap will form an additional oil can be recovered due to gravity drainage. Although the Double Displacement Process has been shown to be successful in recovering tertiary oil in other fields, this project will be the first to utilize air injection in the Double Displacement Process. The use of air injection in this process combines the benefits of air`s low cost and universal accessibility with the potential for accelerated oil recovery due to the combustion process. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs where tertiary oil recovery is presently uneconomical.

  14. Gypsy Field project in reservoir characterization. Final report

    SciTech Connect

    O`Meara, Jr., D. J.

    1997-05-01

    The overall objective of this project is to use the extensive Gypsy Field laboratory and data set as a focus for developing and testing reservoir characterization methods that are targeted at improved recovery of conventional oil. The Gypsy Field laboratory consists of coupled outcrop and subsurface sites which have been characterized to a degree of detail not possible in a production operation. Data from these sites entail geological descriptions, core measurements, well logs, vertical seismic surveys, a 3D seismic survey, crosswell seismic surveys, and pressure transient well tests. The overall project consists of four interdisciplinary sub-projects which are closely interlinked: modeling depositional environments; sweep efficiency; tracer testing; and integrated 3D seismic interpretation. The first of these aims at improving the ability to model complex depositional environments which trap movable oil. The second is a development geophysics project which proposes to improve the quality of reservoir geological models through better use of 3D seismic data. The third investigates the usefulness of a new numerical technique for identifying unswept oil through rapid calculation of sweep efficiency in large reservoir models. The fourth explores what can be learned from tracer tests in complex depositional environments, particularly those which are fluvial dominated.

  15. Secular, annual, and semiannual changes in the baseline level of the earth's magnetic field at North American locations.

    USGS Publications Warehouse

    Campbell, W.H.

    1980-01-01

    Secular, annual, and semiannual changes were obtained from the midnight values of field on specially determined days of quiet magnetospheric conditions. From a selection of North American observatories the latitude variation of these changes was evaluated from 20o to 65o. Results for the active and quiet sun years (1958 and 1965) were compared, and changes at Tucson were traced from 1958 through 1974. The year-to-year variance in the determination of a secular change seemed to be decreased by the present analysis method in comparison to a method which uses the annual mean of hourly values. The annual horizontal field variations were largely northward in early summer and southward in early winter, quiet year amplitudes of 2 to 3 gamma about doubled in the solar active year. The amplitudes of the semiannual field vectors were about one half that of the annual vectors; the directions were apparently inconsistent from year to year. -Authors

  16. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    NASA Technical Reports Server (NTRS)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  17. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  18. TRAC-MIP: Tropical Rain bands with an Annual cycle and Continent - Model Intercomparison Project.

    NASA Astrophysics Data System (ADS)

    Biasutti, Michela; Voigt, Aiko; Scheff, Jack; Zeppetello, Lucas Randall

    2016-04-01

    Understanding and modeling tropical rainfall has proven to be one of the most stubborn challenges in climate science. Tropical rainfall biases such as a double inter-tropical convergence zone (ITCZ) in the East Pacific have now persisted more than two decades despite the general improvements of climate models, and projections for the ITCZ and the monsoon systems remain uncertain in magnitude and sign. Progress in these areas can be fostered by a set of idealized experiments that target the dynamics of tropical rain band, as long as these simple experiments are properly integrated within a full hierarchy of model simulations. To this aim, we have designed the "Tropical Rain belts with an Annual cycle and Continent - Model Intercomparison Project." TRAC-MIP involves five experiments using idealized aquaplanet and land setups to explore the dynamics of tropical rainfall. By using interactive sea-surface temperatures and seasonally-varying insolation TRAC-MIP fills the gap between idealized aquaplanet simulations with prescribed SSTs and the fully-coupled realistic model simulations of CMIP5. TRAC-MIP includes the participation of 13 state-of-the art comprehensive climate models, and it also includes a simplified model that neglects cloud and water-vapor radiative feedbacks, thus allowing a more direct connection between the results from the TRAC-MIP comprehensive models and the theoretical studies of tropical rain belt dynamics. We will present preliminary results from the ensemble, aiming to examine the mechanisms controlling tropical precipitation in the context of forced variability. First and foremost, we are interested in the largest forced variation: the annual cycle. Second, we are interested in the response to key forcings of the future (greenhouse gases) and of the Holocene (insolation). We will draw out the similarities and the distinctions between oceanic and continental rain bands, study the ways in which the two interact with each other, and investigate

  19. Microspacecraft and Earth observation: Electrical Field (ELF) measurement project

    NASA Technical Reports Server (NTRS)

    1990-01-01

    There is a need for an inexpensive, extensive, long-lasting global electric field measurement system (ELF). The primary performance driver of this mission is the need to measure the attitude of each spacecraft in the Earth's electric field very accurately. In addition, it is necessary to know the electric charge generated by the satellite as it crosses the magnetic field lines (E equals V times B). In order to achieve the desired global coverage, a constellation of about 50 satellites in at least 18 different orbits will be used. To reduce the cost of each satellite, off-the-shelf, proven technology will be used whenever possible. Researchers have set a limit of $500,000 per satellite. Researchers expect the program cost, including the deployment of the entire constellation, to be less than $100 million. The minimum projected mission life is five years.

  20. DISPOSAL OF FLUE GAS CLEANING WASTES: EPA SHAWNEE FIELD EVALUATION - THIRD ANNUAL REPORT

    EPA Science Inventory

    The report describes progress made on a field evaluation project being conducted by the EPA to assess techniques for disposing of power plant flue gas cleaning (FGC) wastes. The evaluation site is at TVA's Shawnee steam plant in Paducah, KY. Two prototype scrubbers, using lime an...

  1. ENCOAL mild coal gasification demonstration project. Annual report, October 1994--September 1995

    SciTech Connect

    1996-01-01

    This document is the combination of the fourth quarter report (July - September 1995) and the 1995 annual report for the ENCOAL project. The following pages include the background and process description for the project, brief summaries of the accomplishments for the first three quarters, and a detailed fourth quarter report. Its purpose is to convey the accomplishments and current progress of the project. ENCOAL Corporation, a wholly-owned subsidiary of SMC Mining Company (formerly Shell Mining company, now owned by Zeigler Coal Holding Company), has completed the construction and start-up of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basis coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). The products, as alternative fuels sources, are expected to significantly lower current sulfur emissions at industrial and utility boiler sites throughout the nation, thereby reducing pollutants causing acid rain. In the LFC technology, coal is first deeply dried to remove water physically. The temperature is further raised in a second stage which results in decomposition reactions that form the new products. This chemical decomposition (mild gasification) creates gases by cracking reactions from the feed coal. The chemically altered solids are cooled and further processed to make PDF. The gases are cooled, condensing liquids as CDL, and the residual gases are burned in the process for heat. The process release for the ENCOAL plant predicted that one ton of feed coal would yield roughly {1/2} ton of PDF and {1/2} barrel of CDL. By varying plant running conditions, however, it has since been learned that the actual CDL recovery rate may be as much as 15% to 20% above the projections.

  2. Blast furnace granular coal injection project. Annual report, January--December 1994

    SciTech Connect

    1995-07-01

    This annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is receiving cost-sharing from the US Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to employ British Steel technology that uses granular coal to provide part of the fuel requirement of blast furnaces. The project will demonstrate/assess a broad range of technical/economic issues associated with the use of coal for this purpose. These include: coal grind size, coal injection rate, coal source (type) and blast furnace conversion method. To achieve the program objectives, the demonstration project is divided into the following three Phases: Phase I -- design; Phase II -- construction; and Phase III -- operation. Preliminary design (Phase I) began in 1991 with detailed design commencing in 1993. Construction at Burns Harbor (Phase II) began in August 1993 and was completed at the end of 1994. A 100% construction review meeting was held in December and attended by representatives of DOE, Fluor Daniel and Bethlehem Steel. The coal preparation mills were started up in December, 1994, and the first coal was injected into ``D`` blast furnace on December 19, 1994. Near the end of the year, the grinding mills and injection facility were being prepared for performance testing during the first quarter of 1995. The demonstration test program (phase III) will start in the fourth quarter of 1995.

  3. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.11 What are the general requirements for a Field-Initiated Project? A Field-Initiated Project must— (a) Further... Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of...

  4. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.11 What are the general requirements for a Field-Initiated Project? A Field-Initiated Project must— (a) Further... Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of...

  5. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.11 What are the general requirements for a Field-Initiated Project? A Field-Initiated Project must— (a) Further... Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of...

  6. 34 CFR 350.11 - What are the general requirements for a Field-Initiated Project?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.11 What are the general requirements for a Field-Initiated Project? A Field-Initiated Project must— (a) Further... Project? 350.11 Section 350.11 Education Regulations of the Offices of the Department of...

  7. Microspacecraft and Earth observation: Electrical field (ELF) measurement project

    NASA Technical Reports Server (NTRS)

    Olsen, Tanya; Elkington, Scot; Parker, Scott; Smith, Grover; Shumway, Andrew; Christensen, Craig; Parsa, Mehrdad; Larsen, Layne; Martinez, Ranae; Powell, George

    1990-01-01

    The Utah State University space system design project for 1989 to 1990 focuses on the design of a global electrical field sensing system to be deployed in a constellation of microspacecraft. The design includes the selection of the sensor and the design of the spacecraft, the sensor support subsystems, the launch vehicle interface structure, on board data storage and communications subsystems, and associated ground receiving stations. Optimization of satellite orbits and spacecraft attitude are critical to the overall mapping of the electrical field and, thus, are also included in the project. The spacecraft design incorporates a deployable sensor array (5 m booms) into a spinning oblate platform. Data is taken every 0.1 seconds by the electrical field sensors and stored on-board. An omni-directional antenna communicates with a ground station twice per day to down link the stored data. Wrap-around solar cells cover the exterior of the spacecraft to generate power. Nine Pegasus launches may be used to deploy fifty such satellites to orbits with inclinations greater than 45 deg. Piggyback deployment from other launch vehicles such as the DELTA 2 is also examined.

  8. Microspacecraft and Earth observation: Electrical field (ELF) measurement project

    NASA Astrophysics Data System (ADS)

    Olsen, Tanya; Elkington, Scot; Parker, Scott; Smith, Grover; Shumway, Andrew; Christensen, Craig; Parsa, Mehrdad; Larsen, Layne; Martinez, Ranae; Powell, George

    The Utah State University space system design project for 1989 to 1990 focuses on the design of a global electrical field sensing system to be deployed in a constellation of microspacecraft. The design includes the selection of the sensor and the design of the spacecraft, the sensor support subsystems, the launch vehicle interface structure, on board data storage and communications subsystems, and associated ground receiving stations. Optimization of satellite orbits and spacecraft attitude are critical to the overall mapping of the electrical field and, thus, are also included in the project. The spacecraft design incorporates a deployable sensor array (5 m booms) into a spinning oblate platform. Data is taken every 0.1 seconds by the electrical field sensors and stored on-board. An omni-directional antenna communicates with a ground station twice per day to down link the stored data. Wrap-around solar cells cover the exterior of the spacecraft to generate power. Nine Pegasus launches may be used to deploy fifty such satellites to orbits with inclinations greater than 45 deg. Piggyback deployment from other launch vehicles such as the DELTA 2 is also examined.

  9. 200 Sand Steamflood Demonstration Project. Sixth annual report, June 1981-June 1982

    SciTech Connect

    Alford, W.O.

    1983-08-01

    This demonstration project was initiated in the 200 Sand Pool in the Midway-Sunset Field, California Sand Pool to demonstrate the operational, recovery, and economic aspects of steamflooding a typical heavy oil reservoir which had unfavorable response to cyclic stimulation. The scope of the project involves 5 phases: (1) pilot site monitoring and evaluation; (2) pilot area expansion; (3) site selection for expansion to full-scale project; (4) expansion to full-scale steamflood; and (5) production monitoring. After expansion and steam injection for one year, the wells are averaging 8 B/D oil and 29 B/D water per well. This rate is above the 5 BOPD for cyclic stimulation. Most of the producing wells are steam stimulated about twice a year to enhance steam breakthrough from the continuous steam. The total area has averaged 319 B/D oil and 1233 B/D water the last year. 7 figures, 1 table.

  10. Hangman Restoration Project : Annual Report, August 1, 2001 - July 31, 2002.

    SciTech Connect

    Green, Gerald I.; Coeur D'Alene Tribe.

    2002-06-01

    activities are conducted in the headwaters of the system and are expected to prove beneficial to the natural functions of the entire Hangman Watershed. The following is the FY2001 annual report of Project activities and is submitted as partial fulfillment of Operation and Maintenance Task 2.a. The Objectives and Tasks for this first year were designed to position this Project for a long-term habitat restoration effort. As such, efforts were largely directed at information gathering and project orientation. The major task for this first year was development of a Habitat Prioritization Plan (attached) to guide implementation efforts by selecting areas that will be of greatest benefit to the native ecology. Completion of the first year tasks has positioned the project to move forward with implementing restoration activities using the latest information to accomplish the greatest possible results. The Project will be looking to implement on-the-ground protection and restoration efforts in the coming fiscal year using the data and information gathered in the last fiscal year. Continually refining our understanding of the natural watershed functions and fish and wildlife habitats within the Project Area will result in an increase in the efficiency of project implementation. Research and data gathering efforts will remain a strong emphasis in the coming fiscal year, as it will throughout the life of this Project.

  11. Projecting changes in annual hydropower generation using regional runoff data: An assessment of the United States federal hydropower plants

    SciTech Connect

    Kao, Shih -Chieh; Sale, Michael J.; Ashfaq, Moetasim; Uria Martinez, Rocio; Kaiser, Dale Patrick; Wei, Yaxing; Diffenbaugh, Noah S.

    2014-12-18

    Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease in annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.

  12. Projecting changes in annual hydropower generation using regional runoff data: An assessment of the United States federal hydropower plants

    DOE PAGESBeta

    Kao, Shih -Chieh; Sale, Michael J.; Ashfaq, Moetasim; Uria Martinez, Rocio; Kaiser, Dale Patrick; Wei, Yaxing; Diffenbaugh, Noah S.

    2014-12-18

    Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease inmore » annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.« less

  13. Studies in Teaching 1999 Research Digest. Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, December 1999).

    ERIC Educational Resources Information Center

    McCoy, Leah P., Ed.

    This publication presents a collection of research projects presented at the Annual Research Forum at Wake Forest University: "The Use of Group Work as an Effective Teaching Technique in Lower Level Spanish Classes" (James Blackburn); "What Are the Real Factors behind Student Motivation?" (Matthew Grey Burdick); "Can Students Communicate…

  14. West Hackberry tertiary project. Annual report, September 3, 1994--September 2, 1995

    SciTech Connect

    Gillham, T.; Cerveny, B.; Turek, E.

    1996-05-01

    The West Hackberry Tertiary Project is a field test of the idea that air injection can be combined with the Double Displacement Process to produce a low cost tertiary recovery process which is economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. The Double Displacement Process is based upon the concept that in fields such as West Hackberry waterdrive recoveries are typically 50%-60% of the original oil in place while gravity drainage recoveries average 80%-90% of the original oil in place. Therefore, by injecting a gas into a watered out reservoir, a gas cap will form and additional oil can be recovered due to gravity drainage. Although the Double Displacement Process has been shown to be successful in recovering tertiary oil in other fields, this project will be the first to utilize air injection in the Double Displacement Process. The use of air injection in this process combines the benefits of air`s low cost and universal accessibility with the potential for accelerated oil recovery due to the combustion process. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs where tertiary oil recovery is presently uneconomical.

  15. Impact of annual dosing with ivermectin on progression of onchocercal visual field loss.

    PubMed Central

    Cousens, S. N.; Cassels-Brown, A.; Murdoch, I.; Babalola, O. E.; Jatau, D.; Alexander, N. D.; Evans, J. E.; Danboyi, P.; Abiose, A.; Jones, B. R.

    1997-01-01

    Reported are the results of a randomized, double-masked, placebo-controlled trial of annual ivermectin dosing in 34 rural communities, Kaduna State, northern Nigeria, where guinea savanna onchocerciasis is mesoendemic. A total of 939 individuals underwent Friedmann field analysis at the first examination and saw at least 19 spots in at least one eye. Of these, 636 (68%) completed a subsequent Friedmann field analysis 2-3 years later. The adjusted incidence rate ratio for the ivermectin group versus the placebo group was 0.64 (95% confidence interval (CI): 0.42-0.98). There was some evidence that the impact of ivermectin was greatest among those who had received one dose of ivermectin. The majority of the deteriorations occurred in eyes that gave evidence of optic atrophy at the first examination. An analysis restricted to individuals with optic atrophy at baseline indicated a reduction of 45% in the incidence of visual field deterioration in the ivermectin group (95% CI: 8-67%). Previous findings have shown that ivermectin has an impact on the incidence of optic atrophy. Our results indicate, for the first time, that ivermectin has a substantial impact on the progression of visual field loss among those with pre-existing optic atrophy. PMID:9277010

  16. Canadian Atlantic Storms Program: The Meteorological Field Project.

    NASA Astrophysics Data System (ADS)

    Stewart, R. E.; Shaw, R. W.; Isaac, G. A.

    1987-04-01

    The field phase of the Canadian Atlantic Storms Program (CASP) was conducted from 15 January to 15 March 1986. The principal objective of the meteorological component of the program was to begin the process of improving the understanding and prediction of mesoscale features within East Coast storms as well as the storms themselves. The project area, instrumentation platforms used, real-time forecasts, and the linkage of the program to the American Genesis of Atlantic Lows Experiment (GALE) are discussed. Sixteen storms were sampled during the field phase. A number of mesoscale features such as fronts, precipitation bands, heavy snow, and freezing precipitation were sampled. These features and the storms themselves will be studied over the next several years. It is anticipated that scientific progress in understanding the nature of these winter systems and experience gained with new forecasting tools will lead to improved weather forecasts.

  17. EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement

    SciTech Connect

    Electric Research and Management, Inc.

    1997-03-11

    The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

  18. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    SciTech Connect

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  19. Data management for interdisciplinary field experiments: OTTER project support

    NASA Technical Reports Server (NTRS)

    Angelici, Gary; Popovici, Lidia; Skiles, J. W.

    1993-01-01

    The ability of investigators of an interdisciplinary science project to properly manage the data that are collected during the experiment is critical to the effective conduct of science. When the project becomes large, possibly including several scenes of large-format remotely sensed imagery shared by many investigators requiring several services, the data management effort can involve extensive staff and computerized data inventories. The OTTER (Oregon Transect Ecosystem Research) project was supported by the PLDS (Pilot Land Data System) with several data management services, such as data inventory, certification, and publication. After a brief description of these services, experiences in providing them are compared with earlier data management efforts and some conclusions regarding data management in support of interdisciplinary science are discussed. In addition to providing these services, a major goal of this data management capability was to adopt characteristics of a pro-active attitude, such as flexibility and responsiveness, believed to be crucial for the effective conduct of active, interdisciplinary science. These are also itemized and compared with previous data management support activities. Identifying and improving these services and characteristics can lead to the design and implementation of optimal data management support capabilities, which can result in higher quality science and data products from future interdisciplinary field experiments.

  20. Recovering the tidal field in the projected galaxy distribution

    NASA Astrophysics Data System (ADS)

    Alonso, David; Hadzhiyska, Boryana; Strauss, Michael A.

    2016-07-01

    We present a method to recover and study the projected gravitational tidal forces from a galaxy survey containing little or no redshift information. The method and the physical interpretation of the recovered tidal maps as a tracer of the cosmic web are described in detail. We first apply the method to a simulated galaxy survey and study the accuracy with which the cosmic web can be recovered in the presence of different observational effects, showing that the projected tidal field can be estimated with reasonable precision over large regions of the sky. We then apply our method to the Two Micron All-Sky survey and present a publicly available full-sky map of the projected tidal forces in the local Universe. As an example of an application of these data, we further study the distribution of galaxy luminosities across the different elements of the cosmic web, finding that, while more luminous objects are found preferentially in the most dense environments, there is no further segregation by tidal environment.

  1. Recovering the tidal field in the projected galaxy distribution

    NASA Astrophysics Data System (ADS)

    Alonso, David; Hadzhiyska, Boryana; Strauss, Michael A.

    2016-07-01

    We present a method to recover and study the projected gravitational tidal forces from a galaxy survey containing little or no redshift information. The method and the physical interpretation of the recovered tidal maps as a tracer of the cosmic web are described in detail. We first apply the method to a simulated galaxy survey and study the accuracy with which the cosmic web can be recovered in the presence of different observational effects, showing that the projected tidal field can be estimated with reasonable precision over large regions of the sky. We then apply our method to the 2MASS survey and present a publicly available full-sky map of the projected tidal forces in the local Universe. As an example of an application of these data we further study the distribution of galaxy luminosities across the different elements of the cosmic web, finding that, while more luminous objects are found preferentially in the most dense environments, there is no further segregation by tidal environment.

  2. Recovering the Tidal Field in the Projected Galaxy Distribution

    NASA Astrophysics Data System (ADS)

    Alonso, David; Hadzhiyska, Boryana; Strauss, Michael A.

    2016-04-01

    We present a method to recover and study the projected gravitational tidal forces from a galaxy survey containing little or no redshift information. The method and the physical interpretation of the recovered tidal maps as a tracer of the cosmic web are described in detail. We first apply the method to a simulated galaxy survey and study the accuracy with which the cosmic web can be recovered in the presence of different observational effects, showing that the projected tidal field can be estimated with reasonable precision over large regions of the sky. We then apply our method to the 2MASS survey and present a publicly available full-sky map of the projected tidal forces in the local Universe. As an example of an application of these data we further study the distribution of galaxy luminosities across the different elements of the cosmic web, finding that, while more luminous objects are found preferentially in the most dense environments, there is no further segregation by tidal environment.

  3. West Hackberry Tertiary Project. Annual report, September 3, 1995--September 2, 1996

    SciTech Connect

    Gillham, T.; Cerveny, B.; Turek, E.

    1997-05-01

    The West Hackberry Tertiary Project is a field test of the concept that air injection can be combined with the Double Displacement Process to produce a tertiary recovery process that is both low cost and economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. In reservoirs with pronounced bed dip such as those found in West Hackberry and other Gulf Coast salt dome fields, reservoir performance has shown that gravity drainage recoveries average 80% to 90% of the original oil in place while waterdrive recoveries average 50% to 60% of the original oil in place. The target for tertiary oil recovery in the Double Displacement Process is the incremental oil between the 50% to 60% waterdrive recoveries and the 80% to 90% gravity drainage recoveries. In previous field tests, the Double Displacement Process has proven successful in generating tertiary oil recovery. The use of air injection in this process combines the benefits of air`s low cost and universal accessibility with the potential for accelerated oil recovery from the combustion process. If successful, this project will demonstrate that utilizing air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs (such as Gulf Coast salt dome reservoirs) where any other tertiary process is presently uneconomic.

  4. Geokinetics in situ shale oil recovery project. Third annual report, 1979

    SciTech Connect

    Hutchinson, D.L.

    1980-05-01

    Objective is to develop a true in situ process for recovering shale oil using a fire front moving in a horizontal direction. The project is being conductd at a field site located 70 miles south of Vernal, Utah. During 1979, five retorts were blasted. Four of these were small retorts (approx. 7000 tons), designed to collect data for improving the blast method. The fifth retort was a prototype of a full-sized retort measuring approximately 200 ft on each side. Two retorts, blasted the previous year, were burned, and a third retort was ignited near the end of the year. A total of 5170 bbl of oil was produced during the year.

  5. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

    SciTech Connect

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

    2008-10-01

    The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

  6. Geophysical monitoring of a field-scale biostimulation pilot project

    USGS Publications Warehouse

    Lane, J.W., Jr.; Day-Lewis, F. D.; Casey, C.C.

    2006-01-01

    The USGS conducted a geophysical investigation in support of a U.S. Naval Facilities Engineering Command, Southern Division field-scale biostimulation pilot project at Anoka County Riverfront Park (ACP), downgradient of the Naval Industrial Reserve Ordnance Plant, Fridley, Minnesota. The goal of the pilot project is to evaluate subsurface injection of vegetable oil emulsion (VOE) to stimulate microbial degradation of chlorinated hydrocarbons. To monitor the emplacement and movement of the VOE and changes in water chemistry resulting from VOE dissolution and/or enhanced biological activity, the USGS acquired cross-hole radar zero-offset profiles, traveltime tomograms, and borehole geophysical logs during five site visits over 1.5 years. Analysis of pre- and postinjection data sets using petrophysical models developed to estimate VOE saturation and changes in total dissolved solids provides insights into the spatial and temporal distribution of VOE and ground water with altered chemistry. Radar slowness-difference tomograms and zero-offset slowness profiles indicate that the VOE remained close to the injection wells, whereas radar attenuation profiles and electromagnetic induction logs indicate that bulk electrical conductivity increased downgradient of the injection zone, diagnostic of changing water chemistry. Geophysical logs indicate that some screened intervals were located above or below zones of elevated dissolved solids; hence, the geophysical data provide a broader context for interpretation of water samples and evaluation of the biostimulation effort. Our results include (1) demonstration of field and data analysis methods for geophysical monitoring of VOE biostimulation and (2) site-specific insights into the spatial and temporal distributions of VOE at the ACP. ?? 2006 National Ground Water Association.

  7. Rocketdyne division annual site environmental report, Santa Susana Field Laboratory and De Soto Sites, 1993

    SciTech Connect

    None, None

    1994-10-21

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation. These are identified as the Santa Susana Field Laboratory (SSFL) and the De Soto site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site is essentially light industry with some laboratory-scale R&D and has little potential impact on the environment. The SSFL site, because of its large size (2,668 acres), warranted comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring primarily for the regulatory agencies involved in controlling environmental remediation, i.e., the U.S. DOE, the Nuclear Regulatory Commission (NRC), and the California State Department of Health Services (DHS) Radiologic Health Branch (RHB). For that reason, information concentrates on Area IV at SSFL as this is the site of the former nuclear operations. While the major area of interest is radiological, this report also includes a discussion of nonoradiological monitoring at SSFL.

  8. Rocketdyne division annual site environmental report, Santa Susana Field Laboratory and De Soto Site, 1991

    SciTech Connect

    none,

    1992-12-03

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation. These are identified as the Santa Susana Field Laboratory (SSFL) and the De Soto site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site is essentially light industry with some laboratory-scale R&D and has little potential impact on the environment. The SSFL site, because of its large size (2.668 acres), warranted comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring primarily for the regulatory agencies involved in controlling operations with nuclear fuel or nuclear reactors. i.e., the U.S. DOE and the California State Department of Health Services (DHS). Radiologic Health Branch (RHB). For that reason. information concentrates on Area IV at SSFL as this is the site of the former nuclear operations. While the major area of interest is radiological, this report also includes a discussion of nonradiological monitoring at SSFL.

  9. Rocketdyne division environmental monitoring annual report, Santa Susana Field Laboratory, De Soto, and Canoga Sites, 1990

    SciTech Connect

    none,

    1991-06-20

    This annual report discuses environmental monitoring at three manufacturing and test operations sites operated in the Southern California area by the Rocketdyne Division of Rockwell International Corporation. These are identified as the Santa Susana Field Laboratory (SSFL.), the De Soto site, and the Canoga site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto and Canoga sites are essentially light industry with some laboratory-scale R&D and have little potential impact on the environment. The SSFL site, because of its large size (2,668 acres), warranted comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring primarily for the regulatory agencies involved in controlling operations with nuclear and radioactive materials, i.e., the U.S. DOE, the U.S. Nuclear Regulatory Commission (NRC), and the California State Department of Health Services (DHS), Radiologic Health Branch (RHB). For that reason, information concentrates on Area IV at SSFL as this is the site of the former nuclear operations. While the major realm of interest is radiological, this report also includes some discussion of nonradiological monitoring at SSFL

  10. Rocketdyne division annual site environmental report, Santa Susana Field Laboratory and De Soto Sites, 1992

    SciTech Connect

    none,

    1993-12-14

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation. These are identified as the Santa Susana Field Laboratory (SSFL) and the De Soto site. These sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site is essentially light industry with some laboratory-scale R&D and has little potential impact on the environment. The SSFL site, because of its large size (2,668 acres), warranted comprehensive monitoring to assure protection of the environment. The purpose of this report is to present information on environmental and effluent monitoring primarily for the regulatory agencies involved in controlling environmental remediation, i.e., the U.S. DOE, the Nuclear Regulatory Commission (NRC), and the California State Department of Health Services (DHS) Radiologic Health Branch (RHB). For that reason, information concentrates on Area IV at SSFL as this is the site of the former nuclear operations. While the major area of interest is radiological, this report also includes a discussion of nonradiological monitoring at SSFL.