Science.gov

Sample records for fish project annual

  1. Kalispel Resident Fish Project : Annual Report, 2001.

    SciTech Connect

    Andersen, Todd

    2002-01-01

    In 2001 the Kalispel Natural Resource Department (KNRD) continued assessing habitat and population enhancement projects for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat enhancement measures, as outlined in recommendations from the 1996, 1997, and 1998 annual reports, were monitored during field season 1999, 2000, and 2001. Post assessments were used to evaluate habitat quality, stream morphology and fish populations where enhancement projects were implemented.

  2. Kalispel Resident Fish Project : Annual Report, 1997.

    SciTech Connect

    Donley, Christopher; Lockwoood, Jr., Neil

    1997-01-01

    In 1997 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) continued the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat enhancement measures, as outlined in the recommendations from the 1996 annual report, were conducted during field season 1997. Fencing and planting of riparian areas and instream structures were implemented. As a precursor to these enhancement efforts, pre-assessments were conducted to determine the affects of the enhancement. Habitat quality, stream morphology and fish populations were pre-assessed. This season also began the first year of post-assessment monitoring and evaluation of measures implemented during 1996. The largemouth bass hatchery construction was completed in October and the first bass were introduced to the facility that same month. The first round of production is scheduled for 1998.

  3. Fish & Wildlife Annual Project Summary, 1983.

    SciTech Connect

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  4. Kalispel Resident Fish Project : Annual Report, 2002.

    SciTech Connect

    Andersen, Todd; Olson, Jason

    2003-03-01

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  5. Kalispel Resident Fish Project Annual Report, 2003.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2004-04-01

    In 2003 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2003, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented.

  6. Kalispel Resident Fish Project : Annual Report, 2008.

    SciTech Connect

    Andersen, Todd

    2009-07-08

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  7. Kalispel Resident Fish Project : Annual Report, 1995.

    SciTech Connect

    Maroney, Joseph; Donley, Christopher; Scott, Jason; Lockwood, Jr., Neil

    1997-06-01

    In 1995 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) initiated the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat trout (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat and population assessments were conducted in seven tributaries of the Box Canyon reach of the Pend Oreille River. Assessments were used to determine the types and quality of habitat that were limiting to native bull trout and cutthroat trout populations. Assessments were also used to determine the effects of interspecific competition within these streams. A bull trout and brook trout (Salvelinus fontinalis) hybridization assessment was conducted to determine the degree of hybridization between these two species. Analysis of the habitat data indicated high rates of sediment and lack of wintering habitat. The factors that contribute to these conditions have the greatest impact on habitat quality for the tributaries of concern. Population data suggested that brook trout have less stringent habitat requirements; therefore, they have the potential to outcompete the native salmonids in areas of lower quality habitat. No hybrids were found among the samples, which is most likely attributable to the limited number of bull trout. Data collected from these assessments were compiled to develop recommendations for enhancement measures. Recommendations for restoration include riparian planting and fencing, instream structures, as well as, removal of non-native brook trout to reduce interspecific competition with native salmonids in an isolated reach of Cee Cee Ah Creek.

  8. Umatilla River Subbasin Fish Habitat Improvement Project, 1990 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1991-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation of 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  9. Grande Ronde Basin Fish Habitat Enhancement Project : 1998 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Powell, Russ M.

    1999-05-01

    The primary goal of ''The Grande Ronde Basin Fish Habitat Improvement Project'' is to access, create, improve, protect, and restore reparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin.

  10. Umatilla River Subbasin Fish Habitat Improvement Project, 1989 Annual Report.

    SciTech Connect

    Bailey, Timothy D.

    1989-01-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 17 cooperative lease agreements with private landowners, design and layout of 8.6 miles of Riparian enclosure fence and 3.0 miles of instream structures, development of five fencing contracts and six instream work contracts. Results include implementation of 10 miles of fencing and 3 miles of instream work. Other activities undertaken during this report period are: data collection from 90 habitat monitoring transects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of all age groups on habitat improvement and protection.

  11. Kalispel Resident Fish Project, 2005-2006 Annual Report.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2006-07-01

    In 2005 the Kalispel Natural Resource Department (KNRD) monitored its current enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth Bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in East River and several of its tributaries.

  12. Kalispel Resident Fish Project, 2004-2005 Annual Report.

    SciTech Connect

    Olson, Jason; Andersen, Todd

    2005-06-01

    In 2004 the Kalispel Natural Resource Department (KNRD) implemented a new enhancement monitoring project for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in tributaries to the Pend Oreille River.

  13. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

    2001-04-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect

  14. Kalispel Non-Native Fish Suppression Project 2007 Annual Report.

    SciTech Connect

    Wingert, Michele; Andersen, Todd

    2008-11-18

    Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi) populations. In 2007, the Kalispel Natural Resource Department (KNRD) initiated the Kalispel Nonnative Fish Suppression Project. The goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT). Lower Graham Creek was invaded by non-native rainbow (Oncorhynchus mykiss) and brook trout (Salvelinus fontinalis) after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2008, a fish management structure (barrier) was constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek. The construction of the barrier was preceded by intensive electrofishing in the lower 700 m to remove and relocate all captured fish. Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with a piscicide to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds. In 2004, the Washington Department of Fish and Wildlife (WDFW) proposed an antimycin treatment within the subbasin; the project encountered significant public opposition and was eventually abandoned. However, over the course of planning this 2004 project, little public

  15. Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Morton, Winston H.

    2009-07-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state

  16. Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

    SciTech Connect

    McGowan, Vance R.; Morton, Winston H.

    2008-12-30

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by

  17. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    SciTech Connect

    Allee, Brian J.

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  18. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    SciTech Connect

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  19. Kalispell (i.e. Kalispel) Resident Fish Project : Annual Report, 1996.

    SciTech Connect

    Maroney, Joseph; Donley, Christopher; Lockwood, Jr., Neil

    1997-08-01

    In 1996 the Kalispell Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) continued the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). A habitat and population assessment was conducted on Browns Creek a tributary of Cee Cee Ah Creek, one of the priority tributaries outlined in the 1995 annual report. The assessment was used to determine the type and quality of habitat that was limiting to native bull trout and cutthroat trout populations. Analysis of the habitat data indicated high amounts of sediment in the stream, low bank cover, and a lack of winter habitat. Data collected from this assessment was used to prescribe habitat enhancement measures for Browns Creek. Habitat enhancement measures, as outlined in the recommendations from the 1995 annual report, were conducted during field season 1996. Fencing and planting of riparian areas and in stream structures were implemented. As a precursor to these enhancement efforts, pre-assessments were conducted to determine the affects of the enhancement. Habitat quality, stream morphology and fish populations were pre-assessed. The construction of the largemouth bass hatchery was started in October of 1995. The KNRD, Contractors Northwest Inc. and associated subcontractors are in the process of constructing the hatchery. The projected date of hatchery completion is summer 1997.

  20. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    SciTech Connect

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  1. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 2000 Annual Report.

    SciTech Connect

    Bluff, Stanley

    2000-12-01

    No Annual Production Goals were achieved for the year. The Kalispel Hatchery experienced two episodes of brood fish mortality. The first due to a standpipe malfunction and the second attributed to gas bubble disease caused by elevated Total Dissolved Gases (TDG's) in the reservoir. To date, the hatchery has 29 brood fish in the raceway and ready to spawn. If all things go well this spring, hatchery operations should be well underway next year.

  2. John Day River Subbasin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    SciTech Connect

    Powell, Russ M.; Delano, Kenneth H.

    2004-04-01

    Work undertaken in 2003 included: (1) Seven new fence projects were completed thereby protecting 7.6 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) Maintenance of all active project fences (66.14 miles), watergaps (66), spring developments (33) and plantings were checked and repairs performed. (4) Since the initiation of the Fish Habitat Project in 1984 we have 72.94 miles of stream protected using 131.1 miles of fence. With the addition of the Restoration and Enhancement Projects we have 205.96 miles of fence protecting 130.3 miles of stream.

  3. John Day Basin Spring Chinook Salmon Escapement and Productivity Monitoring; Fish Research Project Oregon, 1998-1999 Annual Report.

    SciTech Connect

    Jonasson, Brian C.; Albaladejo, Victor D.; Carmichael, Richard W.

    1999-12-01

    The John Day River basin supports one of the healthiest naturally-produced populations of spring chinook in the mid-Columbia River basin. The study of life history and natural escapement conducted from 1978 to 1985 (Lindsay et al. 1986) provided valuable information on production and productivity of the John Day River spring chinook. With the exception of two years since completion of the study in 1985 (1989 and 1995), spring chinook spawning surveys were conducted in index areas only and have not provided adequate information to assess age composition, progeny-to-parent production values, and estimate natural spawning escapement. The PATH project (Marmorek and Peters 1996) has identified the John Day basin spring chinook as an index population for assessing the effects of alternative future management actions on salmon stocks in the Columbia Basin. To meet the data needs as an index stock, sufficient annual estimates of spawner escapement, age composition, and smolt-to-adult survival are essential. There is need to determine the annual spawner escapement and age composition for the John Day basin spring chinook to provide us the ability to estimate progeny-to-parent production for each brood year. This need can be met by expanding the annual chinook spawning surveys, estimating the annual escapement, and determining age composition by scale pattern analyses. This project provides information as directed under two measures of the Columbia Basin Fish and Wildlife Program (NPPC 1994). Measure 4.3C specifies that the key indicator populations should be monitored to provide detailed stock status information. In addition, measure 7.1C identifies the need for collection of population status, life history, and other data on wild and naturally spawning populations. This project was developed in direct response to recommendations and needs of the PATH project, the Fish and Wildlife Program, and the Columbia Basin Fish and Wildlife Authority Multi-Year Implementation Plan.

  4. Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.

    SciTech Connect

    McGowan, Vance

    2003-08-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream and 22.9 acres

  5. Annual Progress Report Fish Research Project Oregon : Project title, Evaluation of Habitat Improvements -- John Day River.

    SciTech Connect

    Olsen, Erik A.

    1984-01-01

    This report summarizes data collected in 1983 to evaluate habitat improvements in Deer, Camp, and Clear creeks, tributaries of the John Day River. The studies are designed to evaluate changes in abundance of spring chinook and summer steelhead due to habitat improvement projects and to contrast fishery benefits with costs of construction and maintenance of each project. Structure types being evaluated are: (1) log weirs, rock weirs, log deflectors, and in stream boulders in Deer Creek; (2) log weirs in Camp Creek; and (3) log weir-boulder combinations and introduced spawning gravel in Clear Creek. Abundance of juvenile steelhead ranged from 16% to 119% higher in the improved (treatment) area than in the unimproved (control) area of Deer Creek. However, abundance of steelhead in Camp Creek was not significantly different between treatment and control areas. Chinook and steelhead abundance in Clear Creek was 50% and 25% lower, respectively in 1983, than the mean abundance estimated in three previous years. The age structure of steelhead was similar between treatment and control areas in Deer and Clear creeks. The treatment area in Camp Creek, however, had a higher percentage of age 2 and older steelhead than the control. Steelhead redd counts in Camp Creek were 36% lower in 1983 than the previous five year average. Steelhead redd counts in Deer Creek were not made in 1983 because of high streamflows. Chinook redds counted in Clear Creek were 64% lower than the five year average. Surface area, volume, cover, and spawning gravel were the same or higher than the corresponding control in each stream except in Deer Creek where there was less available cover and spawning gravel in sections with rock weirs and in those with log deflectors, respectively. Pool:riffle ratios ranged from 57:43 in sections in upper Clear Creek with log weirs to 9:91 in sections in Deer Creek with rock weirs. Smolt production following habitat improvements is estimated for each stream

  6. John Day River Subbasin Fish Habitat Enhancement Project, 2001 Annual Report.

    SciTech Connect

    Powell, Russ M.; Delano, Kenneth H.; Jerome, James P.

    2002-07-01

    Work undertaken in 2001 included: (1) 3335 structure posts were pounded on six new projects thereby protecting 10 miles of stream (2) Completion of 1000 ft. of barbed wire fence and one watergap on the Middle Fork of the John Day River/ Forrest property. (3) Fence removal of 5010 ft. of barbed wire fence on the Meredith project. (4) Maintenance of all active project fences (66 miles), watergaps (76), spring developments (32) and plantings were checked and repairs performed. (5) Since the initiation of the Fish Habitat Project in 1984 we have 63.74 miles of stream protected using 106.78 miles of fence. With the addition of the Restoration and Enhancement Projects we have 180.64 miles of fence protecting 120.6 miles of stream.

  7. John Day River Subbasin Fish Habitat Enhancement Project, 2002 Annual Report.

    SciTech Connect

    Powell, Russ M.; Jerome, James P.; Delano, Kenneth H.

    2003-03-01

    Work undertaken in 2002 included: (1) Seven new fence projects were completed thereby protecting 6.0 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) New fence construction (300ft) plus one watergap on Indian Creek/ Kuhl property. (4) Maintenance of all active project fences (58.76 miles), watergaps (56), spring developments (32) and plantings were checked and repairs performed. (5) Restoration and Enhancement projects protected 3 miles of stream within the basin. (6) Since the initiation of the Fish Habitat Project in 1984 we have 67.21 miles of stream protected using 124.2 miles of fence. With the addition of the Restoration and Enhancement Projects we have 199.06 miles of fence protecting 124.57 miles of stream.

  8. John Day River Sub-Basin Fish Habitat Enhancement Project; 2008 Annual Report

    SciTech Connect

    Powell, Russ M.; Alley, Pamela D.; Goin Jr, Lonnie

    2009-07-15

    Work undertaken in 2008 included: (1) Seven new fence projects were completed thereby protecting approximately 10.97 miles of streams with 16.34 miles of riparian fence; (2) Renewal of one expired lease was completed thereby continuing to protect 0.75 miles of stream with 1.0 mile of riparian fence. (3) Maintenance of all active project fences (106.54 miles), watergaps (78), spring developments (33) were checked and repairs performed; (3) Planted 1000 willow/red osier on Fox Creek/Henslee property; (4) Planted 2000 willows/red osier on Middle Fork John Day River/Coleman property; (5) Planted 1000 willow/red osier cuttings on Fox Creek/Johns property; (6) Since the initiation of the Fish Habitat Project in 1984 we have 126.86 miles of stream protected using 211.72 miles of fence protecting 5658 acres. The purpose of the John Day Fish Habitat Enhancement Program is to enhance production of indigenous wild stocks of spring Chinook and summer steelhead within the sub basin through habitat protection, enhancement and fish passage improvement. The John Day River system supports the largest remaining wild runs of spring chinook salmon and summer steelhead in Northeast Oregon.

  9. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    SciTech Connect

    Cousins, Katherine

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  10. John Day River Subbasin Fish Habitat Enhancement Project, 2005-2006 Annual Report.

    SciTech Connect

    Powell, Russ M.; Alley, Pamela D.; Delano, Kenneth H.

    2006-03-01

    Work undertaken in 2005 included: (1) Four new fence projects were completed thereby protecting 7.55 miles of stream with 9.1 miles of new riparian fence (2) Fence removal 1.7 miles of barbed wire. (3) Completed three spring developments (repair work on two BLM springs on Cottonwood Creek (Dayville), 1 solar on Rock Creek/ Collins property). (4) Dredge tail leveling completed on 0.9 miles of the Middle Fork of the John Day River (5) Cut, hauled and placed 30 junipers on Indian Creek/Kuhl property for bank stability. (6) Collected and planted 1500 willow cuttings on Mountain Creek/Jones property. (7) Conducted steelhead redd counts on Lake Cr./Hoover property and Cottonwood Cr./Mascall properties (8) Seeded 200 lbs of native grass seed on projects where the sites were disturbed by fence construction activities. (9) Maintenance of all active project fences (72.74 miles), watergaps (60), spring developments (30) were checked and repairs performed. (10) Since the initiation of the Fish Habitat Program in 1984 we have installed 156.06 miles of riparian fence on leased property protecting 88.34 miles of anadromous fish bearing stream. With the addition of the Restoration and Enhancement Projects from 1996-2001, where the landowner received the materials, built and maintained the project we have a total of 230.92 miles of fence protecting 144.7 miles of stream and 3285 acres of riparian habitat.

  11. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    SciTech Connect

    Bronson, James P.; Loffink, Ken; Duke, Bill

    2008-12-31

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelhead and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one

  12. Walla Walla River Basin Fish Habitat Enhancement Project, 2000-2001 Annual Report.

    SciTech Connect

    Volkman, Jed; Sexton, Amy D.

    2001-01-01

    In 2000, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. Six projects, two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River were part of the exercise. Several thousand native plants as bare-root stock and cuttings were reintroduced to the sites and 18 acres of floodplain corridor was seeded with native grass seed. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan.

  13. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1995 Annual Report.

    SciTech Connect

    Shaw, R.Todd

    1996-05-01

    During the 1995 - 96 project period, four new habitat enhancement projects were implemented under the Umatilla River Basin Anadromous Fish Habitat Enhancement Project by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) in the upper Umatilla River Basin. A total of 38,644 feet of high tensile smooth wire fencing was constructed along 3.6 miles of riparian corridor in the Meacham Creek, Wildhorse Creek, Greasewood Creek, West Fork of Greasewood Creek and Mission Creek watersheds. Additional enhancements on Wildhorse Creek and the lower Greasewood Creek System included: (1) installation of 0.43 miles of smooth wire between river mile (RM) 10.25 and RM 10.5 Wildhorse Creek (fence posts and structures had been previously placed on this property during the 1994 - 95 project period), (2) construction of 46 sediment retention structures in stream channels and maintenance to 18 existing sediment retention structures between RM 9.5 and RM 10.25 Wildhorse Creek, and (3) revegetation of stream corridor areas and adjacent terraces with 500 pounds of native grass seed or close species equivalents and 5,000 native riparian shrub/tree species to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. U.S. Fish and Wildlife Service (USFWS), Bureau of Indian Affairs (BIA) and Environmental Protection Agency (EPA) funds were cost shared with Bonneville Power Administration (BPA) funds, provided under this project, to accomplish habitat enhancements. Water quality monitoring continued and was expanded for temperature and turbidity throughout the upper Umatilla River Watershed. Physical habitat surveys were conducted on the lower 13 river miles of Wildhorse Creek and within the Greasewood Creek Project Area to characterize habitat quality and to quantify various habitat types by area.

  14. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.

    SciTech Connect

    Shaw, R. Todd; Sexton, Amy D.

    2003-02-01

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on the mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included

  15. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    SciTech Connect

    Volkman, Jed

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  16. Umatilla River Basin Anadromus Fish Habitat Enhancement Project : 1994 Annual Report.

    SciTech Connect

    Shaw, R. Todd

    1994-05-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, Section 7.6-7.8 and targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing cooperative instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation (hereafter referred to as Reservation) from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower l/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River in the vicinity of Gibbon, Oregon. In 1993, the project shifted emphasis to a comprehensive watershed approach, consistent with other basin efforts, and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. During the 1994-95 project period, a one river mile demonstration project was implemented on two privately owned properties on Wildhorse Creek. This was the first watershed improvement project to be implemented by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) off of the Reservation. Four 15 year riparian easements and two right-of-way agreements were secured for enhancement of one river mile on Wildhorse Creek and l/2 river mile on Meacham Creek. Enhancements implemented between river mile (RM) 9.5 and RM 10.5 Wildhorse Creek included: (1) installation of 1.43 miles of smooth wire high tensile fence line and placement of 0.43 miles of fence posts and structures to restrict livestock from the riparian corridor, (2) construction of eighteen sediment retention structures in the stream channel to speed riparian recovery by elevating the stream grade, slowing water velocities and

  17. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1993 Annual Report.

    SciTech Connect

    Shaw, R. Todd

    1993-04-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program Measure 704 (d) (1) 34.02 and targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation (hereafter referred to as Reservation) from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower 1/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River (downstream of the Meacham Creek confluence upstream to the Reservation East Boundary). In 1993, the project shifted emphasis to a comprehensive watershed approach consistent with other basin efforts and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. Maintenance of existing habitat improvement projects was included under this comprehensive approach. Maintenance of existing gravel traps, instream and bank stabilization structures was required within project areas during the reporting period due to spring flooding damage and high bedload movement. Maintenance activities were completed between river mile (RM) 0.0 and RM 0.25 Boston Canyon Creek, between RM 0.0 and RM 4 Meacham Creek and between RM 78.5 and RM 79 Umatilla River. Habitat enhancement areas were seeded with native grass, legume, shrub and wildflower mixes and planted with willow cuttings to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. Water quality monitoring continued for temperature and turbidity throughout the upper Umatilla River Watershed. Survey of cross sections and photo

  18. Umatilla River Basin Anadromous Fish Habitat Enhancement Project: 1990 Annual Report.

    SciTech Connect

    Scheeler, Carl A.

    1991-01-01

    The Umatilla habitat improvement program is funded under the Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program measure 704 (d) (1) 34.02, and targets the improvement of water quality and the restoration of riparian areas, spawning and rearing habitat of steelhead, spring and fall chinook and coho salmon. The Confederated Tribes of the Umatilla Indian Reservation are responsible for enhancing stream reaches within the Reservation boundaries as guided by an implementation plan developed cooperatively with the Oregon Department of Fish and Wildlife and the USDA Forest Service, Umatilla National Forest. Treatment areas included the lower 4 miles of Meacham Creek, the lower {1/4} mile of Boston Canyon Creek, and the Umatilla River between RM 78.5 and 80. The upper {1/2} of the Meacham Creek project area including Boston Canyon Creek, which were initially enhanced during 1989, were reentered for maintenance and continued enhancements. Approximately 2400 cu. yds. of boulders and 1000 cu. yds. of riprap was used in the construction of in-stream, stream bank and flood plain structures and in the anchoring of large organic debris (LOD) placements. In-stream structures were designed to increase instream cover and channel stability and develop of a defined thalweg to focus low summer flows. Flood plain structures were designed to reduce sediment inputs and facilitate deposition on flood plains. Riparian recovery was enhanced through the planting of over 1000 willow cuttings and 400 lbs. of grass seed mix and through the exclusion of livestock from the riparian corridor with 4.5 miles of high tensile smooth wire fence. Photo documentation and elevational transects were used to monitor changes in channel morphology and riparian recovery at permanent standardized points throughout the projects. Water quality (temperature and turbidity) data was collected at locations within the project area and in tributaries programmed for future enhancements.

  19. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    SciTech Connect

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A.

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  20. Walla Walla River Basin Fish Habitat Enhancement Project, 2001-2002 Annual Report.

    SciTech Connect

    Volkman, Jed; Sexton, Amy D.

    2003-04-01

    In 2001, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled six properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River. Since 1997, approximately 7 miles of critical salmonid habitat has been secured for restoration and protection under this project. Major accomplishments to date include the following: Secured approximately $250,000 in cost share; Secured 7 easements; Planted 30,000+ native plants; Installed 50,000+ cuttings; and Seeded 18 acres to native grass. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan. Basin-wide monitoring also included the deployment of 6 thermographs to collect summer stream temperatures.

  1. Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2005-2006 Annual Report.

    SciTech Connect

    Schille, Patrick C.

    2006-05-01

    The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.

  2. Yakima/Klickitat Fisheries Project Phase II Fish Screen Operation and Maintenance; Washington Department of Fish and Wildlife, 2003-2004 Annual Report.

    SciTech Connect

    Schille, Patrick C.

    2004-04-01

    The goal of this project is to assure that the benefits of BPA's capital investment in Yakima Basin Phase II fish screen facilities are realized by performing operations that assure optimal fish protection and long facility life through a rigorous preventative maintenance program, while helping to restore ESA listed fish stocks in the Yakima River Basin.

  3. Augmented Fish Health Monitoring, 1992 Annual Report.

    SciTech Connect

    Warren, James W.

    1992-08-01

    The Augmented Fish Health Monitoring Project (Project) had its origin, in the mid-1980's, in perceived differences or inconsistencies in fish disease detection, diagnosis and control capabilities between the five conservation agencies rearing and releasing anadromous salmonids for fishery resource management and mitigation purposes in the Columbia River basin. Agency fish health programs varied greatly. Some agencies had personnel, equipment and funding to frequently monitor the health status of both juvenile production fish and adult salmon or steelhead trout at the time of spawning. Other agencies had much smaller programs and limited resources. These differences became better understood when the Pacific Northwest Fish Health Protection Committee developed its Model Fish Health Protection Program including recommendations for standard fish disease detection procedures. Even though some agencies could not immediately attain the goals set by the Model Program it was unanimously adopted as a desirable objective. Shortly thereafter, a multi-party planning group was assembled to help the Bonneville Power Administration (BPA) find ways to improve agency fish health programs and implement measures under the Fish and Wildlife Program of the Northwest Power Planning Council. The planning group assessed existing agency fish health monitoring capabilities, agreed upon satisfactory levels of capability to detect and identify important fish pathogens, and designed a five-year project establishing comparable fish health monitoring capability in each agency. It was strongly believed that such a project would improve the health and quality of the millions of hatchery fish released annually in the Columbia River basin and improve interagency communications and disease control coordination. During 1986 and 1987 BPA individually negotiated five separate contracts with the fishery agencies to standardize fish health monitoring, develop a common data collection and reporting format

  4. Annual Review of BPA-Funded Anadromous Fish Projects, March 18-20, 1986, Holiday Inn Airport, Portland, Oregon.

    SciTech Connect

    United States. Bonneville Power Administration.

    1986-02-01

    This report contains descriptions of projects specifically related to anadromous salmonids. They include projects in the following categories: (1) fish and wildlife projects in western Montana; (2) fish health and physiology; (3) habitat enhancement and passage improvement - Oregon I; (4) passage improvement and natural propagation - Washington; (5) habitat enhancement and passage improvements - Oregon II; (6) future hydroelectric assessments; (7) habitat enhancement and passage improvement - Idaho; (8) downstream migration: flows and monitoring; (9) downstream migration: reservoir impacts; and (10) habitat evaluation and monitoring. (ACR)

  5. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1991 Annual Report.

    SciTech Connect

    Scheeler, Carl A.

    1993-01-01

    The Umatilla habitat improvement program targets the improvement of water quality and restoration of riparian areas, holding, spawning,and rearing habitats of steelhead, spring and fall Chinook and coho salmon. This report covers work accomplished by the Confederated Tribes of the Umatilla Indian Reservation from April 1991 through May 1992. This program is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (Measure 704 (d)(1) 34.02) as partial mitigation for construction of hydroelectric dams and the subsequent losses of anadromous fish throughout the Columbia River system.

  6. Kalispel Resident Fish Project : Tribal Hatchery Operations and Maintenance Annual Report, 2002.

    SciTech Connect

    Nenema, David

    2003-03-01

    The Kalispel Tribal hatchery successfully spawned largemouth bass broodfish in spring 2002. Approximately 150,000 eggs were produced and hatched. These fry were started on brine shrimp for a period of ten days. At this time, the fry needed more abundance food supply. Cannibalism started and the hatchery staff transferred the remaining fry to the river in hopes that some fish would survive.

  7. John Day River Subbasin Fish Habitat Enhancement Project, 1991 Annual Report.

    SciTech Connect

    Neal, Jeff A.; Jerome, James P.; Delano, Kenneth H.

    1993-05-01

    The purpose of the John Day Fish Habitat Enhancement Program is to enhance production of indigenous wild stocks of spring chinook and summer steelhead within the subbasin through habitat enhancement and access improvement. The John Day River system supports the largest remaining wild runs of spring chinook salmon and summer steelhead in northeast Oregon. It is the goal of this program to preserve and enhance the unique genetic component of the stocks. By attaining this goal we will be able to rebuild fish runs in other Columbia River tributaries in the future, if desired. During 1991, 5 leases were signed adding 5.25 miles of stream to the program. Fence construction included 9.95 miles of riparian fence and 15 livestock water crossings. We constructed 3 log wiers for adult salmon holding, added 280 ft. of new channel, and placed 274 fish habitat boulders, 6 trees and 31 rootwads for juvenile rearing. We constructed 15 stream deflectors and 274 linear feet of bank riprap for streambank stabilization.

  8. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    SciTech Connect

    Kalispel Tribe, Department of Natural Resources

    1998-01-01

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  9. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1992 Annual Report.

    SciTech Connect

    Scheeler, Carl A.; Shaw, R.Todd

    1994-01-01

    The Umatilla habitat improvement program targets improvement of water quality and the restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall Chinook and coho salmon. The Confederated Tribes of the Umatilla Indian Reservation are responsible for enhancing stream reaches within the Reservation boundaries as guided by an implementation plan developed cooperatively with the Oregon Department of Fish and Wildlife and the U.S.D.A. Forest Service, Umatilla National Forest. Enhancements included the construction of nine boulder deflectors, two boulder weirs with pools, and 4 instream boulder placements. Instream cover was improved through the placement of 38 instream cover trees that were cabled to anchor boulders and four rootwads placed and anchored in pools. High tensile fence was constructed along 1.2 miles of stream bank to exclude livestock from riparian areas.

  10. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1993-1994 Annual Report.

    SciTech Connect

    Hayes, Michael C.; Onjukka, Sam T.; Focher, Shannon M.

    1995-01-01

    This report covers the first three years of comprehensive monitoring and evaluation of the Umatilla Hatchery. Because the hatchery and the evaluation study and the fish health monitoring investigations are in the early stages of implementation, much of the information contained in this report is preliminary. The majority of the data that is crucial for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available.

  11. John Day River Subbasin Fish Habitat Enhancement Project, 2000 Annual Report.

    SciTech Connect

    Neal, Jeff A.; Jerome, James P.; Delano, Kenneth H.

    2001-01-01

    During 2000, 3 new projects were completed thereby adding 4.6 miles of stream to the program. Protection for these reaches required the construction of 3.2 miles of riparian fence and 1 livestock watering sites. 5,750 pounds of grass and shrub seed were planted for revegetating ground disturbed during construction. Stream temperatures were monitored on the Middle Fork of the John Day. All project fences, watergaps, spring developments and plantings were checked and repairs performed where needed. We now have 70 miles of stream protected using 111 miles of fence.

  12. John Day River Sub-Basin Fish Habitat Enhancement Project; 1998 Annual Report.

    SciTech Connect

    Neal, Jeff A.; Jerome, James P.; Delano, Kenneth H.

    1999-02-01

    During 1998, three new projects were completed improving 1.8 miles of stream and riparian habitat. Protection for these reaches required the construction of 3.2 miles of riparian fence and 7 livestock water gaps. A previously leased property on the Mainstream was converted from apriarian pasture to a corridor fence after no significant recovery had occurred.

  13. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1994-1995 Annual Report.

    SciTech Connect

    Hayes, Michael C.; Waln, Karen; Carmichael, Richard W.

    1996-01-01

    The Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program authorized construction of the Umatilla Hatchery in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan type of rearing using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (Oncorhynchus nzykiss). The hatchery was completed in the fall of 1991. Partial justification for the hatchery was to develop considerable knowledge and understanding of new production and supplementation techniques. The use of the Michigan raceways in rearing at Umatilla Hatchery was selected because it could increase smolt production given the limited hatchery well water supply and allow comparison of Michigan raceways with the standard Oregon raceways. Results of testing the Michigan raceways will have systematic application in the Columbia Basin. The Umatilla Hatchery is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River and is expected to contribute significantly to the Northwest Power Planning Council`s goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan . The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. This report covers the first four years of the monitoring of the hatchery.

  14. Umatilla River Basin, Anadromous Fish Habitat Enhancement Project : Annual Report 1989.

    SciTech Connect

    Scheeler, Carl A.

    1990-03-01

    The Umatilla habitat improvement program targets the improvement of water quality and the restoration of riparian areas, spawning and rearing habitat of steelhead, spring and fall chinook and coho salmon. The channelization of Meacham Creek by the Union Pacific Railroad combined with poor riparian livestock management created extreme channel instability and bedload movement within the project area. The resulting loss of riparian vegetation caused an increase in water temperatures, evaporative losses and sediment loading from upland sites. Four leases and nine right-of-way agreements were procured for the restoration of 2 miles of stream channel on Meacham Creek and lower Boston Canyon Creek. Treatments included: sloping of gravel deposits to reduce channel braiding and develop a more stable channel configuration, placement of rock and wood structures to reduce erosion of stream banks and encourage the deposition of fines for the establishment of riparian vegetation, placement of instream boulders, weirs and large organic debris to increase holding and hiding cover and to encourage the development of a stable thalweg, and the enhancement of riparian vegetation through planting of hardwood cuttings and grass and forb seeds. Baseline data on stream flows, water temperature and suspended sediments, and channel morphology was collected.

  15. Hood River and Pelton Ladder Monitoring and Evaluation Project and Hood River Fish Habitat Project : Annual Progress Report 1999-2000.

    SciTech Connect

    Lambert, Michael B.; McCanna, Joseph P.; Jennings, Mick

    2001-02-01

    The Hood River subbasin is home to four species of anadromous salmonids: chinook salmon (Oncorhynchus tshawytscha), coho salmon (Oncorhynchus kisutch), steelhead (Oncorhynchus mykiss), and sea run cutthroat trout (Salmo clarki). Indigenous spring chinook salmon were extirpated during the late 1960's. The naturally spawning spring chinook salmon currently present in the subbasin are progeny of Deschutes stock. Historically, the Hood River subbasin hatchery steelhead program utilized out-of-basin stocks for many years. Indigenous stocks of summer and winter steelhead were listed in March 1998 by National Marine Fisheries Service (NMFS) under the Endangered Species Act (ESA) as a ''Threatened'' Species along with similar genetically similar steelhead in the Lower Columbia Basin. This annual report summarizes work for two consecutive contract periods: the fiscal year (FY) 1999 contract period was 1 October, 1998 through 30 September, 1999 and 1 October, 1999 through 30 September, 2000 for FY 2000. Work implemented during FY 1999 and FY 2000 included (1) acclimation of hatchery spring chinook salmon and hatchery summer and winter steelhead smolts, (2) spring chinook salmon spawning ground surveys on the West Fork Hood River (3) genetic analysis of steelhead and cutthroat [contractual service with the ODFW], (4) Hood River water temperature studies, (5) Oak Springs Hatchery (OSH) and Round Butte Hatchery (RBH) coded-wire tagging and clipping evaluation, (6) preparation of the Hood River Watershed Assessment (Coccoli et al., December 1999) and the Fish Habitat Protection, Restoration, and Monitoring Plan (Coccoli et al., February 2000), (7) project implementation of early action habitat protection and restoration projects, (8) Pelton Ladder evaluation studies, (9) management oversight and guidance to BPA and ODFW engineering on HRPP facilities, and (10) preparation of an annual report summarizing project objectives for FY 1999 and FY 2000.

  16. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2002-2003.

    SciTech Connect

    Vaivoda, Alexis

    2004-02-01

    This report summarizes the project implementation and monitoring of all habitat activities in the Hood River basin that occurred over the October 1, 2002 to September 30, 2003 period (FY 03). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 03. A description of the progress during FY 03 and reasoning for deviation from the original tasks and timeline are provided. OBJECTIVE 1 - Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administrative oversight and coordination of the habitat statement of work, budget, subcontracts, personnel, implementation, and monitoring was provided. OBJECTIVE 2 - Continue to coordinate, implement, and revise, as needed, the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document was utilized for many purposes including: drafting the Watershed Action Plan (Coccoli, 2002), ranking projects for funding, and prioritizing projects to target in the future. This document has been reviewed by many, including stakeholders, agencies, and interested parties. The Hood River Watershed Group Coordinator and author of the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan, Holly Coccoli, has updated and revised the plan. Changes will be reflected in the Hood River Subbasin Plan, and after submission of the Subbasin Plan, a formally revised version of the Monitoring Plan will be put out for review. This will more specifically address changes in the Hood River subbasin since 2000, and reflect changes to fish habitat and needs in the Hood River subbasin regarding monitoring. OBJECTIVE 3 - Evaluate and monitor the habitat, accessibility, and presence of winter steelhead, coho salmon, and resident trout upstream of the Middle Fork Irrigation District water

  17. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2001-2002.

    SciTech Connect

    Vaivoda, Alexis

    2003-11-01

    This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. OBJECTIVE 3--Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02 the final engineering was completed on this project. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. Project completion is expected in July 2003. OBJECTIVE 4--Assist the Farmers Irrigation District (FID) in construction and

  18. John Day Basin Spring Chinook Salmon Escapement and Productivity Monitoring; Fish Research Project Oregon, 1999-2000 Annual Report.

    SciTech Connect

    Ruzycki, James R.; Wilson, Wayne H.; Carmichael, Richard W.

    2002-01-01

    The John Day River basin supports one of the healthiest populations of spring chinook salmon (Oncorhynchus tshawytscha) in the entire Columbia River basin. Spring chinook salmon in this basin are therefore, used as an important index stock to measure the effects of future management actions on other salmon stocks in the Columbia basin. To meet the data requirements as an index stock, we estimated annual spawner escapement, age-structure, and smolt-to-adult survival. This information will allow us to estimate progeny-to-parent production for each brood year. To estimate smolt-to-adult survival rates, 1,852 chinook smolts were tagged with PIT tags from 3 March to 5 May, 2000. Length of captured smolts varied, ranging from 80 to 147 mm fork length (mean = 113 mm). These fish will be monitored for PIT tags as returning adults at dams and during future spawning ground surveys. During spawning ground surveys, a total of 351.3 km of stream were surveyed resulting in the observation of 478 redds. When expanded, we estimated total number of redds at 481 and total number of spawners at 1,583 fish in the John Day River basin. We estimated that 13% of the redds were in the mainstem John Day, 27% in the Middle Fork, 34% in the North Fork, and 26% were in the Granite Creek basin. Sampled carcasses had a sex ratio comprised of 53% females and 47% males with an age structure comprised of 0.5% age-2, 6.3% age-3, 88.7% age-4, and 4.5% age-5 fish. Five of the 405 carcasses examined had fin clips suggesting they were of hatchery origin. The 1999 index redd count total for the North Fork, Mainstem, and Granite Creek was lower than the 1999 average (535) but well within the range of annual redd counts during this period. The index redd count for the Middle Fork was higher than the 1990's average (92) but considerably lower than the average from 1978-1985 (401). Although quite variable over the past 40 years, the number of redds in the John Day River basin during 1999 was well within the

  19. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2003-2004 Annual Report.

    SciTech Connect

    Simmons, M.; McKinstry, C.; Cook, C.

    2004-01-01

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish were entrained annually at Grand Coulee Dam. Analysis of the entrainment data found that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the third year of the strobe light study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The objective of the study is to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions. The prototype system consists of six strobe lights affixed to an aluminum frame suspended 15 m vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, illuminate a region directly upstream of the barge. The 2003 study period extended from June 16 through August 1. Three light treatments were used: all six lights on for 24 hours, all lights off for 24 hours, and three of six lights cycled on and off every hour for 24 hours. These three treatment conditions were assigned randomly within a

  20. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2004-2005 Annual Report.

    SciTech Connect

    Johnson, R.; McKinstry, C.; Cook, C.

    2005-02-01

    This report documents a four-year study(a) to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss) at the entrance to the forebay of the third powerplant at Grand Coulee Dam. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). In this report, emphasis is placed on the methodology and results associated with the fourth project year and compared with findings from the previous years to provide an overall project summary. Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power and Conservation Council Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph dams on the Columbia River (Figure S.1). A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish, including kokanee and rainbow trout, were entrained annually at Grand Coulee Dam. Analysis of the data found that 85% of the total entrainment occurred at the dam's third powerplant. Because these entrainment rates represent a significant loss to the tribal fisheries upstream of the dam, they have been judged unacceptable to fishery managers responsible for perpetuating the fishery in Lake Roosevelt. In an effort to reduce fish entrainment rates, the scope of work for the Chief Joseph Kokanee Enhancement Project was modified in 2001 to include a multiyear study of the efficacy of using strobe lights to deter fish from entering the third powerplant forebay. Pacific Northwest National Laboratory initiated the four-year study in collaboration with Colville Tribal

  1. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2002-2003 Annual Report.

    SciTech Connect

    Johnson, R.; McKinstry, C.; Simmons, C.

    2003-01-01

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the second year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The 2002 study period extended from May 18 through July 30. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. The prototype system consisted of six strobe lights affixed to an aluminum frame suspended vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, were aimed to illuminate a specific region directly upstream of the barge. Three light level treatments were used: 6 of 6 lights on, 3 of 6 lights on, and all lights off. These three treatment conditions were applied for an entire 24-hr day and were randomly assigned within a 3-day block throughout the study period. A seven-transducer splitbeam

  2. Fisheries Enhancement in the Fish Creek Basin; Evaluation of In-Channel and Off-Channel Projects, 1984 Annual Report.

    SciTech Connect

    Everest, Fred H.; Sedell, James R.; Wolfe, John

    1985-07-01

    This S-year project which began in 1983 is designed to construct and evaluate habitat improvements in the Fish Creek basin by personnel of the Estacada Ranger District, Ht. Hood National Forest, and the Pacific Northwest Forest and Range Experiment Station. The work is jointly funded by BPA and USDA-Forest Service. The evaluation has focused on activities designed to improve spawning and rearing habitat for chinook and coho salmon and steelhead trout. Specific habitat improvements being evaluated include: boulder berms, an off-channel pond, a side-channel, addition of large woody debris to stream edge habitats, and hardwood plantings to improve riparian vegetation. The initial phases of habitat work have proceeded cautiously in concert with the evaluation so that knowledge gained could be immediately applied to future proposed habitat work. The evaluation has been conducted at the basin level, rather than reach or site level, and has focused intensely on identification of factors limiting production of salmonids in Fish Creek, as well as physical and biological changes resulting from habitat improvement. Identification of limiting factors has proven to be difficult and requires several years of all-season investigation. Results of this work to date indicate that spawning habitat is not limiting production of steelhead or coho in the basin. Coho habitat is presently underseeded because of inadequate escapement. Key summer habitats for coho, age 0 and age 1+ steelhead are beaver ponds, side channels, and pools, respectively. Key winter habitats appear to be groundwater-fed side channels and boulder-rubble stream margins with 30+ cm depth and low velocity water. Additional work is needed to determine whether summer habitat or winter habitat is limiting steelhead and coho production. Chinook use of the basin appears to be related to the timing of fall freshets that control migratory access into the system. Instream habitat improvements show varying degrees of promise

  3. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    SciTech Connect

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek, Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety

  4. Idaho Water Rental Pilot Project Probability/Coordination Study Resident Fish and Wildlife Impacts Phase III, 1997 Annual Report.

    SciTech Connect

    Leitzinger, Eric J.

    1998-10-01

    Phase III began in 1995 with the overall goal of quantifying changes in resident fish habitat in the Snake River Basin upstream of Brownlee Reservoir resulting from the release of salmon flow augmentation water.

  5. Idaho Water Rental Pilot Project probability/coordination study resident fish and wildlife impacts, Phase III. Annual report

    SciTech Connect

    Leitzinger, E.

    1996-09-01

    Phase III began in 1995 with the overall goal of quantifying changes in resident fish habitat in the Snake River basin upstream of Brownlee Reservoir resulting from the release of salmon flow augmentation water. Existing data, in the form of weighted usable area versus flow relationships, were used to estimate habitat changes for white sturgeon (Acipenser transmontanus) and rainbow trout (Oncorhynchus mykiss)in the Snake River between C.J. Strike Dam and Brownlee pool. The increased flows resulted in increased white sturgeon habitat for most life stages. Rainbow trout adult and spawning habitat increased while juvenile and fry habitat generally decreased. Whether or not these short term increases in habitat result in long term benefits to the fish populations has yet to be determined.

  6. Idaho Water Rental Pilot Project Probability/Coordination Study Resident Fish and Wildlife Impact Phase III, 1995 Annual Report.

    SciTech Connect

    Leitzinger, Eric J.

    1996-09-01

    Phase III began in 1995 with the overall goal of quantifying changes in resident fish habitat in the Snake River basin upstream of Brownlee Reservoir resulting from the release of salmon flow augmentation water. Existing data, in the form of weighted usable area versus flow relationships, were used to estimate habitat changes for white sturgeon (Acipenser transmontanus) and rainbow trout (Oncorhynchus mykiss) in the Snake River between C.J. Strike Dam and Brownlee pool. The increased flows resulted in increased white sturgeon habitat for most life stages. Rainbow trout adult and spawning habitat increased while juvenile and fry habitat generally decreased. Whether or not these short term increases in habitat result in long term benefits to the fish populations has yet to be determined.

  7. Umatilla River Subbasin Fish Habitat Improvement; 1995 Annual Report.

    SciTech Connect

    Laws, Troy S.

    1996-06-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife`s Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: (1) Flood damage assessment of project leases after the May 1995 and November 1995 floods, (2) reconstruction of 0.75 miles of riparian fence, (3) inspection and routine maintenance of 14.8 miles of fence, (4) collection of approximately 55,000 native willow and cottonwood cuttings and installation of approximately 21,600 of these material, (5) implementation of two bioengineering projects and initiation of a third project, (6) installation of approximately 30 tree/rootwads for fish habitat enhancement, (7) removal of an abandoned flood irrigation dam/fish barrier, (8) collection and summarization of physical and biological monitoring data, and (9) extensive interagency coordination.

  8. Idaho Water Rental Pilot Project Probability/Coordination Study Resident Fish and Wildlife Impacts Phase III, 1996 Annual Report.

    SciTech Connect

    Leitzinger, Eric J.

    1997-12-01

    Phase 3 began in 1995 with the overall goal of quantifying changes in resident fish habitat in the Snake River Basin upstream of Brownlee Reservoir resulting from the release of salmon flow augmentation water. Existing data, in the form of weighted usable area versus flow relationships, were used to estimate habitat changes for white sturgeon (Acipenser transinontanus) and rainbow trout (Oncorhynchus mykiss) in the Snake River between C.J. Strike Dam and Brownlee pool. The increased flows resulted in increased habitat for adult and juvenile white sturgeon and adult rainbow trout. But, the flows have failed to meet mean monthly flow recommendations for the past three years despite the addition of the flow augmentation releases. It is unlikely that the flow augmentation releases have had any significant long-term benefit for sturgeon and rainbow trout in the Snake River. Flow augmentation releases from the Boise and Payette rivers have in some years helped to meet or exceed minimum flow recommendations in these tributaries. The minimum flows would not have been reached without the flow augmentation releases. But, in some instances, the timing of the releases need to be adjusted in order to maximize benefits to resident fishes in the Boise and Payette rivers.

  9. John Day Basin Spring Chinook Salmon Escapement and Productivity Monitoring; Fish Research Project Oregon, 2000-2001 Annual Report.

    SciTech Connect

    Carmichael, Richard W.; Claire, Glenda M.; Seals, Jason

    2002-01-01

    The four objectives of this report are: (1) Estimate annual spawner escapement and number of spring chinook salmon redds in the John Day River basin; (2) Determine sex ratio, age composition, length-at-age of spawners, and proportion of natural spawners that are hatchery origin strays; (3) Determine adequacy of historic index surveys for indexing spawner abundance and for detecting changes in spawner distribution through time; and (4) Estimate smolt-to-adult survival for spring chinook salmon emigrating from the John Day River basin.

  10. Augmented Fish Health Monitoring, 1989 Annual Report.

    SciTech Connect

    Michak, Patty

    1990-05-01

    Since 1986 Washington Department of Fisheries (WDF) has participated in the Columbia Basin Augmented Fish Health Monitoring Project, funded by Bonneville Power Administration (BPA). This interagency project was developed to provide a standardized level of fish health information from all Agencies rearing fish in the Columbia Basin. Agencies involved in the project are: WDF, Washington Department of Wildlife, Oregon Fish and Wildlife, Idaho Fish and Game, and the US Fish and Wildlife Service. WDF has actively participated in this project, and completed its third year of fish health monitoring, data collection and pathogen inspection during 1989. This report will present data collected from January 1, 1989 to December 31, 1989 and will compare sampling results from screening at spawning for viral pathogens and bacterial kidney disease (BKD), and evaluation of causes of pre-spawning loss. The juvenile analysis will include pre-release examination results, mid-term rearing exam results and evaluation of the Organosomatic Analysis completed on stocks. 2 refs., 4 figs., 15 tabs.

  11. Colville Tribal Fish Hatchery, 2001-2002 Annual Report.

    SciTech Connect

    Arteburn, John; Christensen, David

    2003-03-01

    Federal hydropower projects as well as private power utility systems have had a major negative impact upon anadromous fish resources that once flourished in the Columbia River and it's tributaries. Several areas have been completely blocked to anadromous fish by dams, destroying the primary food resource (salmon) for many native people forcing them to rely heavily upon resident fish to replace these lost resources. The Colville Tribal Fish Hatchery is an artificial production program that addresses the loss of anadromous fish resources in the Upper Columbia Sub-Region within the ''blocked area'' created by the construction of Chief Joseph and Grand Coulee Dams. This project enhances resident fisheries located in the Intermountain and Columbia Cascade Provinces, specifically within the Colville Reservation portion of the Upper Columbia, SanPoil and Oakanogan Sub-Basins. The project partially mitigates for anadromous fish losses through protection/augmentation of resident fish populations to enhance fishery potential (i.e. in-place, out-of-kind mitigation) pursuant to Resident Fish Substitution Policy of the Northwest Power Planning Councils Fish and Wildlife Program. The hatchery was accepted into the Council's Fish and Wildlife Program in 1984 and the hatchery was completed in 1990. The Colville Tribal Hatchery (CTH) is located on the northern bank of the Columbia River just down stream of the town of Bridgeport, Washington that is just down stream of Chief Joseph Dam. The hatchery is located on land owned by the Colville Tribes. The minimum production quota for this facility is 22,679 kg (50,000 lbs.) of trout annually. All fish produced are released into reservation waters, including boundary waters in an effort to provide a successful subsistence/recreational fishery for Colville Tribal members and provide for a successful nonmember sport fishery. The majority of the fish distributed from the facility are intended to support ''carry-over'' fisheries. Fish

  12. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2001-2002 Annual Report.

    SciTech Connect

    Easterbrooks, John A.; Pearsons, Todd N.

    2003-03-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council (Columbia River Basin Fish and Wildlife Program 1994, Measure 7.4K). The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and Wildlife Program; and (5) to implement the Project in a prudent and environmentally sound manner. Current YKFP operations have been designed to test the principles of supplementation (Busack et al. 1997). The Project's experimental design has focused on the following critical uncertainties affecting supplementation: (1) The survival and reproductive success of hatchery fish after release from the hatchery; (2) The impacts of hatchery fish as they interact with non-target species and stocks; and, (3) The effects of supplementation on the long-term genetic fitness of fish stocks. The YKFP endorses an adaptive management policy applied through a project management framework as described in the Yakima/Klickitat Fisheries Project Planning Status Report (1995), Fast and Craig (1997), Clune and Dauble 1991. The project is managed by a Policy Group consisting of a representative of the Yakama Nation (YN, lead agency) and a representative of the Washington

  13. Augmented Fish Monitoring, 1988 Annual Report.

    SciTech Connect

    Michak, Patty

    1989-05-01

    Since 1986 Washington department of Fisheries (WDF) has participated in the Columbia Basin Augmented Fish Health Monitoring Project. This project provides a standardized level of fish health information from all Agencies rearing fish in the Columbia Basin. WDF has actively participated in this project, and completed its second year of fish health monitoring, data collection and pathogen inspection during 1988. This report will present data collected from January 1, 1988 to December 31, 1988 and will compare sampling results from 1987 and 1988. The analysis will be divided in two sections: adult analysis and juvenile analysis. The adult analysis will include results from screening at spawning for viral pathogens and bacterial kidney disease (BKD), and evaluation of causes of pre-spawning loss. The juvenile analysis will include pre-release examination results, mid-term rearing exam results and evaluation of the Organosomatic Analysis completed on index stocks. Additionally, highlights from monthly monitoring exams will identify any significant and unusual findings from the routine exams completed in 1988. 6 refs., 8 figs., 14 tabs.

  14. Umatilla River Subbasin Fish Habitat Improvement Program, 2005 Annual Report.

    SciTech Connect

    St. Hilaire, Danny R.

    2006-05-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat conditions. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, through the restoration of stable channel function. This report provides a summary of Program activities for the 2005 calendar year (January 1 through December 31, 2005), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance (O&M), and (4) Monitoring and Evaluation (M&E). This report also summarizes activities associated with Program Administration, Interagency Coordination, and Public Education.

  15. Emergency Fish Restoration Project; Final Report 2002.

    SciTech Connect

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  16. Augmented Fish Health Monitoring in Idaho, 1992 Annual Report.

    SciTech Connect

    Munson, A.Douglas

    1993-12-01

    This report documents the progress of Idaho Department of Fish and Game`s fish health monitoring during the past five years and will serve as a completion report for the Augmented Fish Health Monitoring Project. Anadromous fish at twelve IDFG facilities were monitored for various pathogens and organosomatic analyses were performed to anadromous fish prior to their release. A fish disease database has been developed and data is presently being entered. Alternate funding has been secured to continue fish health monitoring.

  17. Duck Valley Resident Fish Stocking Program, 2000 Final Annual Report.

    SciTech Connect

    Dodson, Guy; Pero, Vincent

    2002-01-01

    The Shoshone-Paiute Tribes fish-stocking program was begun in 1988 and is intended to provide a subsistence fishery for the tribal members. The program stocks catchable and fingerling size trout in Mt. View and Sheep Creek Reservoirs. Rainbow trout are purchased from only certified disease-free facilities to be stocked in our reservoirs. This project will help restore a fishery for tribal members that historically depended on wild salmon and steelhead in the Owyhee and Bruneau Rivers and their tributaries for their culture as well as for subsistence. This project is partial substitution for loss of anadromous fish production due to construction and operation of hydroelectric dams on the Columbia and Snake Rivers. Until anadromous fish can be returned to the Owyhee and Bruneau Rivers this project will continue indefinitely. As part of this project the Shoshone-Paiute Tribes will also receive income in the form of fees from non-tribal members who come to fish these reservoirs. Regular monitoring and evaluation of the fishery will include sampling for length/weight/condition and for signs of disease. A detailed Monitoring and evaluation plan has been put in place for this project. However due to budget limitations on this project only the fishery surveys and limited water quality work can be completed. A creel survey was initiated in 1998 and we are following the monitoring and evaluation schedule for this program (as budget allows) as well as managing the budget and personnel. This program has been very successful in the past decade and has provided enjoyment and sustenance for both tribal and non-tribal members. All biological data and stocking rates will be including in the Annual reports to Bonneville Power Administration (BPA).

  18. Umatilla River Subbasin Fish Habitat Improvement; 1993 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Laws, Troy S.

    1994-05-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife`s Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: (1) procurement of one access easement with a private landowner, (2) design, layout, and implementation of 3.36 miles of instream structure maintenance, (3) inspection and routine maintenance of 15.1 miles of fence, (4) revegetation along 3.36 miles of stream, (5) collection and summarization of physical and biological monitoring data, (6) extensive interagency coordination, and (7) environmental education activities with local high school students.

  19. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2002-2003 Annual Report.

    SciTech Connect

    Pearsons, Todd N.; Easterbrooks, John A.

    2003-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council and funded by the Bonneville Power Administration. The YKFP has adopted the definition of supplementation described by Regional Assessment of Supplementation Program (1992), which is ''the use of artificial propagation in an attempt to maintain or increase natural production while maintaining the long-term fitness of the target population, and keeping the ecological and genetic impacts on nontarget populations within specified biological limits''. Recent scientific reviews of hatchery supplementation continue to highlight the experimental nature and risk of supplementation (Independent Scientific Group 1996; National Research Council 1996; Lichatowich 1999; Independent Multidisciplinary Science Team 2000; Independent Scientific Advisory Board 2003; Hatchery Scientific Review Group 2003). In addition, many of these reviews included recommendations about the best ways to operate a supplementation program. Most of these recommendations were already being done or have been incorporated into the YKFP. The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and Wildlife Program; and (5) to

  20. Umatilla River Subbasin Fish Habitat Improvement; 1994 Annual Report.

    SciTech Connect

    Laws, Troy S.

    1995-06-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife`s Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: 1) Flood damage assessment of project leases after the May 1994 flood, 2) reconstruction of 1.25 miles of high tensile steel fence, 3) inspection and routine maintenance of 14.8 miles of fence, 4) collection of approximately 6,600 cottonwood and willow cuttings for transplanting in spring of 1995, 5) establishment of three bioengineered habitat restoration demonstration projects, 6) Implementation of a streambank stabilization workshop (bioengineering techniques) for Umatilla Basin residents and resource agency personnel, 7) collection and summarization of physical and biological monitoring data, and 8) extensive interagency coordination.

  1. Radioactive contamination of fish, shellfish, and waterfowl exposed to Hanford effluents: Annual summaries, 1945--1972. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Hanf, R.W.; Dirkes, R.L.; Duncan, J.P.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction Project (HEDR) is to estimate the potential radiation doses received by people living within the sphere of influence of the Hanford Site. A potential critical pathway for human radiation exposure is through the consumption of waterfowl that frequent onsite waste-water ponds or through eating of fish, shellfish, and waterfowl that reside in/on the Columbia River and its tributaries downstream of the reactors. This document summarizes information on fish, shellfish, and waterfowl radiation contamination for samples collected by Hanford monitoring personnel and offsite agencies for the period 1945 to 1972. Specific information includes the types of organisms sampled, the kinds of tissues and organs analyzed, the sampling locations, and the radionuclides reported. Some tissue concentrations are also included. We anticipate that these yearly summaries will be helpful to individuals and organizations interested in evaluating aquatic pathway information for locations impacted by Hanford operations and will be useful for planning the direction of future HEDR studies.

  2. The OECD Fish Testing Framework Project

    EPA Science Inventory

    OECD Project 2.30 on a Fish Testing Framework was initiated in mid-2009, with the United States as the lead country. The objectives of the project are to review the regulatory needs and data requirements for fish testing and review the currency of existing OECD Test Guidelines. ...

  3. An O-"fish"-ial Research Project

    ERIC Educational Resources Information Center

    Newman, James; Krustchinsky, Rick; Vanek, Karen; Nguyen, Kim-Thoa

    2009-01-01

    In this "O-"fish"-ial" research project, third-grade students use multiple resources to research several fish species, write a research paper and develop a PowerPoint presentation to communicate their findings. In addition, students actually examine these species up close with samples from the local market, and then conclude the project with a…

  4. Fish Passage Center 2007 Annual Report.

    SciTech Connect

    DeHart, Michele

    2008-11-25

    The January-July runoff volume above the Dalles Dam in 2007 was 89% of the average runoff volume for the 1971-2000 historical record. The April-July runoff volume at Lower Granite Dam was 68% of the 1971-2000 historical record. Over the 79 year historical record from 1929 through 2007, the 2007 January-July runoff volume at the Dalles was the 50th lowest year out of the 79th year record. The January through July runoff volume at Lower Granite was the 65th lowest runoff year out of 79 on record. This year can be characterized by steadily decreasing snowpack which was below average in the Columbia Basin by the end of April. The combination of runoff volume, decreasing snowpack and reservoir operations resulted in spring migration flows at McNary Dam averaging 239 Kcfs, slightly above the Biological Opinion flow objective of 237 Kcfs. However the spring period migration flows in the Snake River averaged 61 Kcfs at Lower Granite Dam, substantially below the Biological Opinion flow objective of 85 Kcfs. Summer migration period Biological Opinion flow objectives averaged 163 Kcfs at McNary Dam, substantially below the summer flow objective of 200 Kcfs. Summer migration period flows in the Snake River at Lower Granite Dam averaged 29 Kcfs, also substantially below the Biological Opinion flow objective of 50 Kcfs. Overall spring migrants in the Columbia River experienced better migration flows than spring migrants in the Snake River reach. Summer migration flow objectives were not achieved in either the Columbia or Snake rivers. The 2007 FCRPS Operations Agreement represents an expanded and improved spill program that goes beyond the measures contained in the 2004 Biological Opinion. During the spring period, spill now occurs for twenty-four hours per day at all projects, except for John Day Dam where the daily program remains at 12 hours. A summer spill program provides spill at all the fish transportation collector projects (Lower Granite, Little Goose, Lower Monumental

  5. Yakima Basin Fish Passage Project, Phase 2

    SciTech Connect

    Not Available

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs.

  6. Yakima/Klickitat Fisheries Project: Short Project Overview of Spring Chinook Salmon Supplementation in the Upper Yakima Basin; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2004-2005 Annual Report.

    SciTech Connect

    Fast, David E.; Bosch, William J.

    2005-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is on schedule to ascertain whether new artificial production techniques can be used to increase harvest and natural production of spring Chinook salmon while maintaining the long-term genetic fitness of the fish population being supplemented and keeping adverse genetic and ecological interactions with non-target species or stocks within acceptable limits. The Cle Elum Supplementation and Research Facility (CESRF) collected its first spring chinook brood stock in 1997, released its first fish in 1999, and age-4 adults have been returning since 2001. In these initial years of CESRF operation, recruitment of hatchery origin fish has exceeded that of fish spawning in the natural environment, but early indications are that hatchery origin fish are not as successful at spawning in the natural environment as natural origin fish when competition is relatively high. When competition is reduced, hatchery fish produced similar numbers of progeny as their wild counterparts. Most demographic variables are similar between natural and hatchery origin fish, however hatchery origin fish were smaller-at-age than natural origin fish. Long-term fitness of the target population is being evaluated by a large-scale test of domestication. Slight changes in predation vulnerability and competitive dominance, caused by domestication, were documented. Distribution of spawners has increased as a result of acclimation site location and salmon homing fidelity. Semi-natural rearing and predator avoidance training have not resulted in significant increases in survival of hatchery fish. However, growth manipulations in the hatchery appear to be reducing the number of precocious males produced by the YKFP and consequently increasing the number of migrants. Genetic impacts to non-target populations appear to be low because of the low stray rates of YKFP fish. Ecological impacts to valued non-target taxa were within containment objectives or impacts that

  7. John Day Fish Passage and Screening; 2001 Annual Report.

    SciTech Connect

    Allen, Steve

    2002-03-26

    The accomplishments of the John Day, Umatilla, and Walla Walla Fish Passage and Screening Programs include the following: Operation and maintenance of 364 existing fish screening devices (see Table 4), replacement of 18 outdated fish screening devices that totaled 31 rotary drums (some were multiple drum systems), 4 new screens at unscreened diversions, 26 pump intake fish screens, fabrication of components for 16 additional fish screens for the Rogue basin, construction of two fish passage structures, and participation in other activities. After the replacement or construction of 22 fish screening devices during 2001, we now have 108 screening devices that meet NMFS criteria. Funding for these projects was attained from BPA, NMFS and OWEB. The John Day Fish Passage and Screening Program focused construction efforts into new and replacement fish screening devices for these various programs throughout the state of Oregon. The program also continued to develop and implement innovative designs to meet the diverse and expanding needs for the state of Oregon. Projects completed during this report period meet the current National Marine Fisheries Service (NMFS) criteria. Fish species targeted for protection include ESA Listed Mid-Columbia steelhead, Columbia basin bull trout, anadromous and resident salmonids, and numerous non-game fish species. Priority project locations have been identified as the upper reaches of the Middle Fork, North Fork, South Fork and the Mainstem of the John Day River and their tributaries. These upper reaches contain critical salmon and steelhead spawning and rearing habitat.

  8. Augmented Fish Health Monitoring, 1988 Annual Report.

    SciTech Connect

    Warren, James W.

    1989-08-15

    Augmented Fish Health Monitoring Contract AI79-87BP35585 was implemented on July 20, 1987. Second year activities focused on full implementation of disease surveillance activities and histopathological support services to participating state agencies. Persistent and sometimes severe disease losses were caused by infectious hematopoietic necrosis (IHN) in summer steelhead trout in Idaho and in spring chinook salmon at hatcheries on the lower Columbia River. Diagnostic capability was enhanced by the installation, for field use, of enzyme-linked immunosorbent assay (ELISA) technology at the Dworshak Fish Health Center for the detection and assay of bacterial kidney disease and by a dot-blot'' training session for virus identification at the Lower Columbia Fish Health Center. Complete diagnostic and inspection services were provided to 13 Columbia River basin National Fish hatcheries. Case history data was fully documented in a computerized data base for storage and analysis. This report briefly describes work being done to meet contract requirements for fish disease surveillance at Service facilities in the Columbia River basin. It also summarizes the health status of fish reared at those hatcheries and provides a summary of case history data for calendar year 1988. 2 refs., 4 tabs.

  9. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay, 2005-2006 Annual Report.

    SciTech Connect

    Simmons, M.; Johnson, Robert; McKinstry, C.

    2006-03-01

    The construction of Grand Coulee and Chief Joseph dams on the Columbia River resulted in the complete extirpation of the anadromous fishery upstream of these structures. Today, this area is totally dependent upon resident fish resources to support local fisheries. The resident fishing is enhanced by an extensive stocking program for target species in the existing fishery, including kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss). The kokanee fishery in Lake Roosevelt has not been meeting the return goals set by fisheries managers despite the stocking program. Investigations of physical and biological factors that could affect the kokanee population found predation and entrainment had a significant impact on the fish population. In 1999 and 2000, walleye (Sander vitreum) consumed between 15% and 9%, respectively, of the hatchery kokanee within 41 days of their release, while results from a study in the late 1990s estimated that entrainment at Grand Coulee Dam could account for up to 30% of the total mortality of the stocked fish. To address the entrainment loss, the Bonneville Power Administration commissioned a study to determine if fish would avoid areas illuminated by strobe lights in the forebay of the third powerplant. This work was conducted by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). From 2002 through 2004, six strobe lights were suspended in the center of the opening to the third powerplant forebay during summer months. Results from those studies indicated that fish appeared to be attracted to the illuminated area but only at night and when flow conditions within the third powerplant forebay were minimal. However, small but consistent results from these studies indicated that under high flow conditions, fish might be avoiding the lights. The 2005 study was designed to examine whether, under high flow conditions near the penstock

  10. Augmented Fish Health Monitoring for Washington Department of Wildlife, 1987 Annual Report.

    SciTech Connect

    Gearheard, Jim

    1986-11-01

    This report documents the progress of various tasks during the second year of a five year augmented fish health monitoring project. Fish at Washington Department of Wildlife hatcheries rearing anadromous fish for the Columbia River drainage were intensively monitored either annually, semi-annually, or monthly for various pathogens of concern. We have developed a database for documentation of the presence and severity, or absence of these pathogens. In addition, we are progressing in the development of disease histories for these stations. The installations have been examined for impediments to good fish health both in terms of physical (structural and water supply) problems and loading problems. Recommendations have been made to correct these difficulties. 2 refs., 3 figs., 16 tabs.

  11. Umatilla River Subbasin Fish Habitat Improvement; 1991 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1992-01-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife`s Umatilla Basin Habitat Improvement Project. In May of this year a thirty year flood event occurred in the Umatilla Basin that resulted in major changes to the year`s statement of work and to the future direction of the program. All projects in the Birch Creek drainage sustained damage to either fencing or instream work, with severe damages on about 1/3 of the project areas. As a result of flooding, and subsequent maintenance demands, all new project implementation in the Birch Creek drainage was cancelled; the entire implementation season was spent repairing flood damages in the Birch Creek drainage. The major activities undertaken during this report period were: (a) construction of O.5 miles of riparian corridor fence on Meacham Creek, (b) performing intensive instream maintenance on 7.25 miles of Mainstem Birch and East Birch creeks, (c) performing major fence maintenance on 1.8 miles of flood damaged riparian corridor fence, (d) rebuilding of O.5 miles of flood destroyed fence, and 54 stream crossing fences, (e) retrofitting of three miles of high tensile fence with an extended electric wire, and (f) spending considerable time working with landowners to resolve flood related problems and come to agreement on project maintenance activities. Other activities undertaken during this report period were: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint picture taking, procurement of instream work permits, and coordination with numerous agencies and tribes.

  12. Colville Tribal Fish Hatchery, 2000-2001 Annual Report.

    SciTech Connect

    Arteburn, John; Christensen, David

    2003-03-01

    Federal hydropower projects as well as private power utility systems have had a devastating impact upon anadromous fish resources that once flourished in the Columbia River and it's tributaries. Several areas were completely blocked to anadromous fish by dams, causing the native people who's number one food resource was salmon to rely entirely upon resident fish to replace lost fisheries resources. The Colville Tribal Fish Hatchery is an artificial production program to partially mitigate for anadromous fish losses in the ''Blocked Area'' above Chief Joseph and Grand Coulee Dams pursuant to Resident Fish Substitution Policy of the Northwest Power Planning Councils Fish and Wildlife Program. The hatchery was accepted into the Council's Fish and Wildlife Program in 1984 as a resident fish substitution measure and the hatchery was completed in 1990. The minimum production quota for this facility is 22,679 kg (50,000 lbs.) of trout. To achieve this quota the Colville Tribal Hatchery was scheduled to produce 174,000 fingerling rainbow trout (5 grams/fish), 330,000 sub-yearling rainbow trout (15 grams/fish), 80,000 legal size rainbow trout (90 grams/fish), 196,000 fingerling brook trout (5 grams/fish), 330,000 subyearling brook trout (15 grams/fish) and 60,000 lahontan cutthroat trout (15 grams/fish) in 2001. All fish produced are released into reservation waters, including boundary waters in an effort to provide a successful subsistence /recreational fishery for Colville Tribal members as well as a successful non-member sport fishery. The majority of the fish distributed from the facility are intended to provide a ''carry-over'' fishery. Fish produced at the facility are intended to be capable of contributing to the natural production component of the reservation fish populations. Contribution to the natural production component will be achieved by producing and releasing fish of sufficient quality and quantity for fish to survive to spawning maturity, to spawn

  13. Augmented Fish Health Monitoring, 1990 Annual Report.

    SciTech Connect

    Warren, James W.

    1990-08-15

    Augmented Fish Health Monitoring Contract AI79-87BP35585 was implemented on July 20, 1987. This report briefly describes third-year work being done to meet contract requirements for fish disease surveillance at Service facilities in the Columbia River basin and for histopathological support services provided to participating state agencies. It also summarizes the health status of fish reared at participating Service hatcheries and provides a summary of case history data for calendar year 1989. Items of note included severe disease losses to infectious hematopoietic necrosis (IHN) in summer steelhead trout in Idaho, the detection of IHN virus in juvenile spring chinook salmon at hatcheries on the lower Columbia River, and improved bacterial kidney disease (BKD) detection and adult assay by enzyme-linked immunosorbent assay (ELISA) technology at the Dworshak Fish Health Center. Complete diagnostic and inspection services were provided to 13 Columbia River Basin National Fish Hatcheries. Case history data was fully documented in a computerized data base for storage and analysis and is summarized herein. 2 refs., 1 fig., 4 tabs.

  14. John Day Fish Passage and Screening; 2002 Annual Report.

    SciTech Connect

    Hartlerode, Ray; Dabashinsky, Annette; Allen, Steve

    2003-01-28

    This project is necessary to insure that replacement of fish screening devices and fishways meet current NMFS design criteria for the protection of all salmonid life stages. The mission of the fish passage program in Northeast Oregon is to protect and enhance fish populations by assisting private landowners, public landowners, irrigation districts and others by maintaining fish screening devices and fishways. These facilities reduce or eliminate fish loss associated with irrigation withdrawals, and as a result insure fish populations are maintained for enjoyment by present and future generations. Assistance is provided through state and federal programs. This can range from basic technical advice to detailed construction, fabrication and maintenance of screening and passage facilities. John Day screens personnel identified 50 sites for fish screen replacement, and one fish passage project. These sites are located in critical spawning, rearing and migration areas for spring chinook, summer steelhead and bull trout. All projects were designed and implemented to meet current NMFS criteria. It is necessary to have a large number of sites identified due to changes in weather, landowner cooperation and access issues that come up as we try and implement our goal of 21 completed projects.

  15. Augmented Fish Health Monitoring in Oregon, 1987-1988 Annual Report.

    SciTech Connect

    Bauer, Jerry

    1988-05-01

    Diminished natural fish production in the Columbia River Basin has prompted increased artificial propagation to compensate both for losses of anadromous salmonids related to hydroelectric facilities and for other causes. The health and quality of artificially propagated smolts probably is a major influence on survival. Smolt survival varies greatly from one location to another, among different species and from one year to the next. Fish health monitoring is necessary to identify cause of mortality, assist in producing a healthy smolt, and provide a means for improving hatchery effectiveness. The Bonneville Power Administration (BPA) conducted a series of meetings to define the minimum ''needed'' level of fish health monitoring, determine what was presently being done and what additional effort was needed in the Basin's 54 anadromous fish hatcheries. Funding for the additional effort in Oregon began June 2, 1987. The goal of this project is to increase smolt-to-adult survival by accomplishing the following: (1) increase monitoring for specific fish pathogens and fish health parameters; (2) measure hatchery water supply quality; (3) identify facility impediments to fish health; (4) create a database of hatchery and fish health information; (5) establish a technical steering committee to evaluate and refine the project annually; and (6) increase communication and technology application among personnel in hatcheries, research, management, other agencies and the public. 4 refs., 3 figs., 10 tabs.

  16. Confederated Tribes of the Umatilla Indian Reservation North Fork John Day River Basin Anadromous Fish Enhancement Project, Annual Report for FY 2000.

    SciTech Connect

    Macy, Tom L.; James, Gary A.

    2003-03-01

    The CTUIR North Fork John Day River Basin Anadromous Enhancement Project (NFJDAFEP) identified and prioritized stream reaches in The North Fork John day River basin for habitat improvements during the 2000 project period. Public out reach was emphasized during this first year of the project. We presented multiple funding and enhancement options to landowners. We concentrated on natural recovery methods, riparian fencing and off-stream livestock water developments. Under this BPA contract four riparian easements were signed protecting almost 5 miles of tributary streams. There are nine offstream water developments associated with these easements. Some landowners chose to participate in other programs based on Tribal outreach efforts. Two landowners chose NRCS programs for enhancement and one chose OWEB as a funding source. Two landowners implemented there own enhancement measures protecting 3 miles of stream. Cooperation between the NRCS/FSA/SWCDs and the Tribe to create joint projects and develop alternative funding scenarios for riparian enhancement was a major effort. The Tribe also worked with the North Fork John Day Watershed Council, USFS and ODFW to coordinate projects and support similar projects throughout the John Day Basin. We provided input to the John Day Summary prepared for the NWPPC by ODFW. The Tribe worked with the Umatilla National Forest on the Clear Creek Dredgetailings Rehabilitation project and coordinated regularly with USFS Fisheries, Hydrology and Range staff.

  17. Confederated Tribes of the Umatilla Indian Reservation North Fork John Day River Basin Anadromous Fish Enhancement Project, Annual Report for FY 2001.

    SciTech Connect

    Macy, Tom L.; James, Gary A.

    2003-03-01

    The CTUIR North Fork John Day River Basin Anadromous Enhancement Project (NFJDAFEP) identified and prioritized stream reaches in The North Fork John day River basin for habitat improvements during the 2000 project period. Public outreach was emphasized during this first year of the project. During the past year we concentrated on satisfying landowner needs, providing cost share alternatives, providing joint projects and starting implementation. We presented multiple funding and enhancement options to landowners. We concentrated on natural recovery methods, riparian fencing and offstream livestock water developments. Under this BPA contract four riparian easements have been signed protecting almost 5 miles of tributary streams. There are nine offstream water developments associated with these easements. Some landowners chose to participate in other programs based on Tribal outreach efforts. Some landowners chose NRCS programs for enhancement and others chose OWEB as a funding source. The exact amount of stream protection due to other funding sources probably exceeds that by BPA, however most would not have entered any program without initial Tribal outreach. Cooperation between the NRCS/FSA/SWCDs and the Tribe to create joint projects and develop alternative funding scenarios for riparian enhancement was a major effort. The Tribe also worked with the North Fork John Day Watershed Council, USFS and ODFW to coordinate projects and support similar projects throughout the John Day Basin.

  18. Umatilla River Subbasin Fish Habitat Improvement; 1992 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1993-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: (1) procurement of one cooperative lease agreement and one access easement with private landowners, (2) design and layout of 1.3 miles of riparian exclosure fence and 1.4 miles of instream structure maintenance, and (3) development of one fencing contract and three instream work contracts. Results include implementation of 1.9 miles of fencing, 1.4 miles of instream maintenance work, reconstruction of 0.75 miles of flood damaged fence, inspection and routine maintenance of 13.5 miles of fence, and planting of grasses, legumes and shrubs along 4.6 miles of stream. Other activities undertaken during this report period are: collection and summarization of temperature data, establishment and data collection from habitat monitoring transects, electrofishing surveys and spawning ground counts, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  19. Augmented Fish Health Monitoring, 1987 Annual Report.

    SciTech Connect

    Michak, Patty

    1989-04-01

    Washington Department of Fisheries has divided the sampling and data collection into three major groups: adult analysis, juvenile analysis and database development. The adult analysis done at spawning includes screening for viral pathogens and Bacterial Kidney Disease (BKD). Pre-spawning mortalities are sampled for the presence of bacterial pathogens and parasites to determine causes of pre-spawning loss. Juvenile analysis involves monthly monitoring; pre-release examinations for viral pathogens, BKD and, where appropriate, whirling disease (M. cerebralis); completion of the Organosomatic analysis on four index stocks, and midterm exams on yearling groups for BKD and M. cerebralis. Database development required constructing fish health monitoring forms and a computer based data entry and retrieval system. We have completed a full year of sampling and data collection, January, 1987 to January, 1988. This report will present and analyze this information.

  20. Ford Hatchery; Washington Department of Fish and Wildlife Fish Program, Hatcheries Division, Annual Report 2003.

    SciTech Connect

    Lovrak, Jon; Ward, Glen

    2004-01-01

    Bonneville Power Administration's participation with the Washington Department of Fish and Wildlife, Ford Hatchery, provides the opportunity for enhancing the recreational and subsistence kokanee fisheries in Banks Lake. The artificial production and fisheries evaluation is done cooperatively through the Spokane Hatchery, Sherman Creek Hatchery (WDFW), Banks Lake Volunteer Net Pen Project, and the Lake Roosevelt Fisheries Evaluation Program. Ford Hatchery's production, together with the Sherman Creek and the Spokane Tribal Hatchery, will contribute to an annual goal of one million kokanee yearlings for Lake Roosevelt and 1.4 million kokanee fingerlings and fry for Banks Lake. The purpose of this multi-agency program is to restore and enhance kokanee salmon and rainbow trout populations in Lake Roosevelt and Banks Lake due to Grand Coulee Dam impoundments. The Ford Hatchery will produce 9,533 lbs. (572,000) kokanee annually for release as fingerlings into Banks Lake in October. An additional 2,133 lbs. (128,000) kokanee will be transferred to net pens on Banks Lake at Electric City in October. The net pen raised kokanee will be reared through the fall, winter, and early spring to a total of 8,533 lbs and released in May. While the origin of kokanee comes from Lake Whatcom, current objectives will be to increase the use of native (or, indigenous) stocks for propagation in Banks Lake and the Upper Columbia River. Additional stocks planned for future use in Banks Lake include Lake Roosevelt kokanee and Meadow Creek kokanee. The Ford Hatchery continues to produce resident trout (80,584 lb. per year) to promote the sport fisheries in trout fishing lakes in eastern Washington (WDFW Management, Region 1). Operation and maintenance funding for the increased kokanee program was implemented in FY 2001 and scheduled to continue through FY 2010. Funds from BPA allow for an additional employee at the Ford Hatchery to assist in the operations and maintenance associated with

  1. Investigations into the [Early] Life History of Spring Chinook Salmon in the Grande Ronde River Basin : Fish Research Project, Oregon : Annual Report 1994 : Project Period 1 June 1993 to 31 May 1994.

    SciTech Connect

    Keefe, MaryLouise

    1996-04-01

    This study was designed to describe aspects of the life history strategies of spring chinook salmon in the Grande Ronde basin. During the past year we focused on rearing and migration patterns of juveniles and surveys of spawning adults. The specific objectives for the early life history portion of the study were: Objective 1, document the annual in-basin migration patterns for spring chinook salmon juveniles in the upper Grande Ronde River, including the abundance of migrants, migration timing and duration; Objective 2, estimate and compare smolt survival indices to mainstem Columbia and Snake River dams for fall and spring migrating spring chinook salmon; Objective 3 initiate study of the winter habitat utilized by spring chinook salmon in the Grande Ronde River basin. The specific objectives for the spawning ground surveys were: Objective 4, conduct extensive and supplemental spring chinook salmon spawning ground surveys in spawning streams in the Grande Ronde and Imnaha basin, Objective 5; determine how adequately historic index area surveys index spawner abundance by comparing index counts to extensive and supplemental redd counts; Objective 6, determine what changes in index areas and timing of index surveys would improve the accuracy of index surveys; Objective 7, determine the relationship between number of redds observed and fish escapement for the Grande Ronde and Imnaha river basins.

  2. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.

  3. Walla Walla River Fish Passage Operations Program, 2004-2005 Annual Report.

    SciTech Connect

    Bronson, James P.; Duke, Bill B.

    2006-02-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2004-2005 project year, there were 590 adult summer steelhead, 31 summer steelhead kelts (Oncorhynchus mykiss), 70 adult bull trout (Salvelinus confluentus); 80 adult and 1 jack spring Chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 13, 2004, and June 16, 2005. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by ODFW in order to enumerate fish passage. Of the total, 143 adult summer steelhead and 15 summer steelhead kelts were enumerated at the west ladder at Nursery Bridge Dam during the video efforts between February 4 and May 23, 2005. Operation of the Little Walla Walla River

  4. Walla Walla River Fish Passage Operations Program, 2000-2001 Annual Report.

    SciTech Connect

    Zimmerman, Brian C.; Duke, Bill B.

    2004-02-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow measures, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2000-2001 project year, there were 624 summer steelhead (Oncorhynchus mykiss), 24 bull trout (Salvelinus confluentus), and 47 spring chinook (O. tshawytscha) counted at the Nursery Bridge Dam adult trap between December 27, 2000 and June 7, 2001. The Little Walla Walla River juvenile trap was not operated this year. The project transported 1600 adult spring chinook from Ringold Springs Hatchery to the South Fork Walla Walla Brood Holding Facility and outplanted 1156 for natural spawning in the basin. The project also provided equipment for transportation of juveniles captured during the construction fish salvage at Nursery Bridge Dam.

  5. Test Use Project. Annual Report.

    ERIC Educational Resources Information Center

    Choppin, Bruce H.; And Others

    One of the two major phases of the Test Use Project of the Center for the Study of Evalaution (CSE) is discussed; that is, the collection and analyses of survey data from a national sample of teachers and principals representing the targeted grades/schools. Some historical background influencing that phase of the project is provided. The findings…

  6. Walla Walla River Fish Passage Operations Program, 2002-2003 Annual Report.

    SciTech Connect

    Bronson, James P.; Duke, Bill B.

    2004-03-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2002-2003 project year, there were 545 adult summer steelhead (Oncorhynchus mykiss), 29 adult bull trout (Salvelinus confluentus); 1 adult and 1 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway adult trap between January 1 and June 23, 2003. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. Operation of the Little Walla Walla River juvenile trap for trap and haul purposes was not necessary this year. The project transported 21 adult spring chinook from Ringold Springs Hatchery and 281 from Threemile Dam to the South Fork Walla Walla Brood Holding Facility. Of these, 290 were outplanted in August for natural spawning in the basin.

  7. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program; 2002 Annual Report.

    SciTech Connect

    Combs, Mitch

    2003-01-01

    Sherman Creek Hatchery's primary objective is the restoration and enhancement of the recreational and subsistence fishery in Lake Roosevelt and Banks Lake. The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operations and evaluations. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. The Washington Department of Fish and Wildlife, Spokane Tribe of Indians and the Colville Confederated Tribe form the interagency Lake Roosevelt Hatcheries Coordination Team (LRHCT) which sets goals and objectives for both Sherman Creek and the Spokane Tribal Hatchery and serves to coordinate enhancement efforts on Lake Roosevelt and Banks Lake. The primary changes have been to replace the kokanee fingerling program with a yearling (post smolt) program of up to 1,000,000 fish. To construct and operate twenty net pens to handle the increased production. The second significant change was to rear up to 300,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Current objectives include increased use of native/indigenous stocks where available for propagation into Upper Columbia River Basin Waters. The Lake Roosevelt Fisheries Evaluation Program (LRFEP) is responsible for monitoring and evaluation on the Lake Roosevelt Projects. From 1988 to 1998, the principal sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and kokanee and the economic value of the fishery has increased substantially during this 10-year

  8. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2004 Annual Report.

    SciTech Connect

    DeHart, Michele

    2005-07-01

    The runoff volume for 2004 was below average throughout the Columbia Basin. At The Dalles the January-July runoff volume was 77% of average or 83.0 MAF. Grand Coulee, Hungry Horse, and Libby were below their Biological Opinion reservoir target elevations on April 10 at the beginning of the spring salmon migration season. All major storage reservoirs except Libby, Grand Coulee, Hungry Horse, Dworshak, and Brownlee were within a few feet of full by the end of June and early July. Overall, NOAA Biological Opinion seasonal flow targets were not met at any project for either spring or summer migrations of salmon and steelhead. Overall, spill was reduced in 2004. Implementation of Biological Opinion spill for fish passage measures was wrought with contention in 2004, particularly for summer spill which was finally the subject of litigation. The spring migration spill season began with debate among the fishery mangers and tribes and action agencies regarding spill at Bonneville Dam for the Spring Creek Hatchery release. The USFWS agreed to a spill test versus a corner collector operation to determine the best route for survival for these fish. The USFWS agreement includes no spill for early Spring Creek Hatchery releases for the next two years. Spring spill at Snake River transportation sites was eliminated after April 23, and transportation was maximized. The federal operators and regulators proposed to reduce Biological Opinion summer spill measures, while testing the impact of those reductions. This proposal was eventually rejected in challenges in the Federal Ninth Circuit Court. The Corps of Engineers reported that spill at Bonneville Dam in the 2002 to 2004 period was actually lower than reported due to a spill calibration error at the project. Because flows were low and spill levels were easily controlled few fish were observed with any signs of Gas Bubble Trauma. The annual Smolt Monitoring Program was implemented and provided in-season timing and passage

  9. Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.

    SciTech Connect

    St. Hilaire, Danny R.

    2006-02-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.

  10. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of

  11. Project Aloha. Annual Evaluation Report.

    ERIC Educational Resources Information Center

    Berryessa Union Elementary School District, San Jose, CA.

    This program, included in "Effective Reading Programs...," was begun in 1971 and serves 1,826 children of varying socioeconomic levels in K-4. Project ALOHA is a mainland demonstration of the Hawaii English Program, a total instructional system that provides goals, materials, a management system, and inservice training. The program is highly…

  12. John Day Fish Passage and Screening; 2004 Annual Report.

    SciTech Connect

    Allen, Steve

    2005-02-01

    The primary goal of the Oregon Screens Project was to implement 20 replacement screens projects in the John Day sub-basin and any projects identified in the Umatilla and Walla Walla sub-basins. A secondary goal is to complete a passage project, if one is identified, in any of the above sub-basins. Mid-Columbia ESU listed steelhead and USF&W listed bull trout inhabit these sub-basins and are present at most locations, along with a variety of resident fish species. We also provide assistance to our Enterprise Screen Shop, in the Grande Ronde/Imnaha subbasins, if needed. All projects were designed and implemented under current National Marine Fisheries Service screening and passage criteria.

  13. John Day Fish Passage and Screening; 2003 Annual Report.

    SciTech Connect

    Allen, Steve

    2004-02-01

    The primary goal of the Oregon Screens Project was to implement 20 replacement screens projects in the John Day sub-basin and any projects identified in the Umatilla and Walla Walla sub-basins. A secondary goal is to complete a passage project, if one is identified, in any of the above sub-basins. Mid-Columbia ESU listed steelhead and USF&W listed bull trout inhabit these sub-basins and are present at most locations, along with a variety of resident fish species. We also provide assistance to our Enterprise Screen Shop, in the Grande Ronde/Imnaha sub-basins, if needed. All projects were designed and implemented under current National Marine Fisheries Service screening and passage criteria.

  14. SIMBIOS Project 1998 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta, S.

    1999-01-01

    The purpose of this series of technical reports is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Ocean Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant to substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issues by an operational project.

  15. SIMBIOS Project 1999 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    1999-01-01

    The purpose of this technical memorandum is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  16. Investigations into the Early History of Naturally Produced Spring Chinook Salmon in the Grand Ronde Basin : Fish Research Project Oregon : Annual Progress Report Project Period September 1, 1996 to August 31, 1997.

    SciTech Connect

    Johasson, Brian C.; Tranquilli, J. Vincent; Keefe, MaryLouise

    1998-10-28

    We have documented two general life history strategies utilized by juvenile spring chinook salmon in the Grande Ronde River basin: (1) juveniles migrate downstream out of summer rearing areas in the fall, overwinter in river valley habitats, and begin their seaward migration in the spring, and (2) juveniles remain in summer rearing areas through the winter and begin seaward migration in the spring. In migration year 96-97, the patterns evident from migrant trap data were similar for the three Grande Ronde River populations studied, with 42% of the Lostine River migrants and 76% of the Catherine Creek migrants leaving upper rearing areas in the fall. Contrary to past years, the majority (98%) of upper Grande Ronde River migrants moved out in the fall. Total trap catch for the upper Grande Ronde River was exceedingly low (29 salmon), indicating that patterns seen this year may be equivocal. As in previous years, approximately 99% of chinook salmon juveniles moved past our trap at the lower end of the Grande Ronde River valley in the spring, reiterating that juvenile chinook salmon overwinter within the Grande Ronde valley section of the river. PIT-tagged fish were recaptured at Grande Ronde River traps and mainstem dams. Recapture data showed that fish that overwintered in valley habitats left as smolts and arrived at Lower Granite Dam earlier than fish that overwintered in upstream rearing areas. Fish from Catherine Creek that overwintered in valley habitats were recaptured at the dams at a higher rate than fish that overwintered upstream. In this first year of data for the Lostine River, fish tagged during the fall migration were detected at a similar rate to fish that overwintered upstream. Abundance estimates for migration year 96-97 were 70 for the upper Grande Ronde River, 4,316 for the Catherine Creek, and 4,323 for the Lostine River populations. Although present in most habitats, juvenile spring chinook salmon were found in the greatest abundance in pool

  17. Governmental Accounting: Comprehensive Annual Financial Report Project.

    ERIC Educational Resources Information Center

    Moncada, Susan M.

    This paper provides student materials for a course project in which students read, analyze, and interpret the information in an actual comprehensive annual financial report (CAFR) of a government entity (a city with a population greater than 40,000), and is based on the actual reviewer's checklist used by the Government Finance Officers…

  18. National Writing Project 2009 Annual Report

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2009

    2009-01-01

    Writing as a tool for thinking, learning, and communicating is crucial to academic and career success as well as to active citizenship in a democracy. This annual report of the National Writing Project features teachers of math, chemistry, art, history, and business who develop their students as writers. These educators employ writing to engage…

  19. Oregon Migrant Health Project, 1970 Annual Report.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    The 1970 annual report on the Oregon Migrant Health Project discusses health services for migrant agricultural workers and their families (approximately 30,000 individuals) who worked and lived temporarily in various Oregon counties. As noted, some 9,000 of the 30,000 migrants were estimated to be in need of some type of medical service. Thus, the…

  20. Oregon Migrant Health Project, 1971 Annual Report.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    In its 9th year of providing migrant health services through a U.S. Public Health Service Continuing Migrant Health Act grant, this Oregon Migrant Health Project annual report is concerned with (1) the health services provided during the 1970-71 harvest season through a contractual arrangement between the Oregon State Health Division and 10 county…

  1. SIMBIOS Project; 2003 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    2003-01-01

    The purpose of this technical report is to provide current documentation of the the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-99 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.

  2. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmon recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.

  3. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program, 2003 Annual Report.

    SciTech Connect

    Lovrak, Jon; Combs, Mitch

    2004-01-01

    Sherman Creek Hatchery's primary objective is the restoration and enhancement of the recreational and subsistence fishery in Lake Roosevelt and Banks Lake. The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operation and evaluation. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. The Washington Department of Fish and Wildlife, Spokane Tribe of Indians and the Colville Confederated Tribes form the interagency Lake Roosevelt Hatcheries Coordination Team (LRHCT) which sets goals and objectives for both Sherman Creek and the Spokane Tribal Hatchery. The LRHCT also serves to coordinate enhancement efforts on Lake Roosevelt and Banks Lake. Since 1994 the kokanee fingerling program has changed to yearling releases. By utilizing both the hatcheries and additional net pens, up to 1,000,000 kokanee yearlings can be reared and released. The construction and operation of twenty net pens in 2001 enabled the increased production. Another significant change has been to rear up to 300,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Current objectives include increased use of native tributary stocks where available for propagation into Upper Columbia River Basin waters. The Lake Roosevelt Fisheries Evaluation Program (LRFEP) is responsible for monitoring and evaluation on the Lake Roosevelt Projects. From 1988 to 1998, the principal sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and kokanee

  4. Umatilla Basin Habitat Improvement Project; 1990 Annual Report.

    SciTech Connect

    Bailey, Timothy D.; Rimbach, Gregory P.

    1991-03-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation OF 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

  5. The OECD Fish Testing Framework Project: Summary of Workshop Recommendations

    EPA Science Inventory

    An integrated Fish Testing Framework was initiated in mid-2009 as OECD Project 2.30 with the United States as the lead country. The objectives of the project were to review the regulatory needs and data requirements for fish testing and review the currency of existing OECD Test ...

  6. Smolt Migration Characteristics and Mainstem Snake and Columbia River Detection Rates of PIT-Tagged Grande Ronde and Imnaha River Naturally-Produced Spring Chinook Salmon, 1996 Annual Report : Fish Research Project, Oregon.

    SciTech Connect

    Sankovich, Paul; Keefe, MaryLouise; Carmichael, Richard W.

    1997-01-01

    This is the fifth year of a multi-year study to assess smolt migration characteristics and cumulative detection rates of naturally-produced chinook salmon (Oncorhynchus tshawytscha), from northeast Oregon streams. The goal of this project is to develop an understanding of interpopulation and interannual variation in several early life history characteristics of naturally-produced chinook salmon from the Grande Ronde and Imnaha River subbasins. This project provides information useful in the recovery of listed Snake River spring/summer chinook salmon. Specific populations included in the study are (1) Catherine Creek, (2) upper Grande Ronde River, (3) Lostine River, (4) Imnaha River, (5) Wenaha River, and (6) Minam River. In this document, we present findings from research completed in 1996. Naturally-produced chinook salmon populations in the Grande Ronde and Imnaha River subbasins have declined drastically in recent years due in part to habitat alterations and hydropower development. Declines have continued despite extensive mitigation efforts, including fish passage improvements, artificial production, supplementation, and habitat modification (BPA Division of Fish and Wildlife 1990). Snake River spring/summer chinook salmon (hereafter referred to as chinook salmon), which include naturally-produced chinook salmon in the Grande Ronde and Imnaha River subbasins, have been listed under the Endangered Species Act of 1973 as threatened or endangered since 1992.

  7. Investigations into the Early Life History of Naturally Produced Spring Chinook Salmon in the Grande Ronde River Basin : Fish Research Project Oregon : Annual Progress Report Project Period 1 September 1998 to 31 August 1999.

    SciTech Connect

    Jonasson, Brian C.

    2000-01-01

    We determined migration timing and abundance of juvenile spring chinook salmon from three populations in the Grande Ronde River basin. We estimated 13,180 juvenile chinook salmon left upper rearing areas of the Grande Ronde River from July 1998 to June 1999; approximately 0.2% of the migrants left in summer, 18% in fall and 82% in spring. We estimated 15,949 juvenile chinook salmon left upper rearing areas of Catherine Creek from July 1998 to June 1999; approximately 0.2% of the migrants left in summer, 57% in fall, 2% in winter, and 41% in spring. We estimated 14,537 juvenile chinook salmon left the Grande Ronde Valley, located below the upper rearing areas in Catherine Creek and the Grande Ronde River, from October 1998 to June 1999; approximately 99% of the migrants left in spring. We estimated 31,113 juvenile chinook salmon left upper rearing areas of the Lostine River from July 1998 to June 1999; approximately 4% of the migrants left in summer, 57% in fall, 3% in winter, and 36% in spring. We estimated 42,705 juvenile spring chinook salmon left the Wallowa Valley, located below the mouth of the Lostine River, from August 1998 to June 1999; approximately 46% of the migrants left in fall, 6% in winter, and 47% in spring. Juvenile chinook salmon PIT-tagged on the upper Grande Ronde River were detected at Lower Granite Dam from 31 March to 20 June 1999, with a median passage date of 5 May. PIT-tagged salmon from Catherine Creek were detected at Lower Granite Dam from 19 April to 9 July 1999, with a median passage date of 24 May. PIT-tagged salmon from the Lostine River were detected at Lower Granite Dam from 31 March through 8 July 1999, with a median passage date of 4 May. Juveniles tagged as they left the upper rearing areas of the Grande Ronde River in fall and that overwintered in areas downstream were detected in the hydrosystem at a higher rate than fish tagged during winter in the upper rearing areas, indicating a higher overwinter survival in the

  8. Investigations into the Early Life History of Naturally Spring Chinook Salmon in the Grande Ronde River Basin : Fish Research Project Oregon : Annual Progress Report Project Period 1 September 1997 to 31 August 1998.

    SciTech Connect

    Keefe, MaryLouise; Tranquilli, J. Vincent

    1998-01-01

    We determined migration timing and abundance of juvenile spring chinook salmon from three populations in the Grande Ronde River basin. We estimated 6,716 juvenile chinook salmon left upper rearing areas of the Grande Ronde River from July 1997 to June 1998; approximately 6% of the migrants left in summer, 29% in fall, 2% in winter, and 63% in spring. We estimated 8,763 juvenile chinook salmon left upper rearing areas of Catherine Creek from July 1997 to June 1998; approximately 12% of the migrants left in summer, 37% in fall, 21% in winter, and 29% in spring. We estimated 8,859 juvenile chinook salmon left the Grande Ronde Valley, located below the upper rearing areas in Catherine Creek and the Grande Ronde River, from October 1997 to June 1998; approximately 99% of the migrants left in spring. We estimated 15,738 juvenile chinook salmon left upper rearing areas of the Lostine River from July 1997 to April 1998; approximately 3% of the migrants left in summer, 61% in fall, 2% in winter, and 34% in spring. We estimated 22,754 juvenile spring chinook salmon left the Wallowa Valley, located below the mouth of the Lostine River, from September 1997 to April 1998; approximately 55% of the migrants left in fall, 5% in winter, and 40% in spring. Juvenile chinook salmon PIT-tagged on the upper Grande Ronde River were detected at Lower Granite Dam from 4 April to 26 June 1998, with a median passage date of 1 May. PIT-tagged salmon from Catherine Creek were detected at Lower Granite Dam from 3 April to 26 June 1998, with a median passage date of 8 May. PIT-tagged salmon from the Lostine River were detected at Lower Granite Dam from 31 March through 26 May 1998, with a median passage date of 28 April. Juveniles tagged as they left the upper rearing areas of the Grande Ronde and Lostine rivers in fall and that overwintered in areas downstream were detected in the hydrosystem at a higher rate than fish tagged during winter in the upper rearing areas, indicating a higher

  9. Walla Walla River Fish Passage Operations Program, 2003-2004 Annual Report.

    SciTech Connect

    Bronson, James P.

    2004-12-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2003-2004 project year, there were 379 adult summer steelhead (Oncorhynchus mykiss), 36 adult bull trout (Salvelinus confluentus); 108 adult and 3 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 21, 2003, and June 30, 2004. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by the WWBNPME project in order to radio tag spring chinook adults. A total of 2 adult summer steelhead, 4 bull trout, and 23 adult spring chinook were enumerated at the west ladder at Nursery Bridge Dam during the trapping operations between May 6 and May 23, 2004. Operation of the Little Walla Walla

  10. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    SciTech Connect

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  11. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of

  12. ENCOAL mild coal gasification project. Annual report

    SciTech Connect

    Not Available

    1993-10-01

    This document is the combination of the fourth quarter report (July--September 1993) and the 1993 annual report for the ENCOAL project. The following pages include the background and process description for the project, brief summaries of the accomplishments for the first three quarters, and a detailed fourth quarter report. Its purpose is to convey the accomplishments and current progress of the project. ENCOAL Corporation, has completed the construction of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basin coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). ENCOAL submitted an application to the US Department of Energy (DOE) in August 1989, soliciting joint funding of the project in the third round of the Clean Coal Technology Program. The project was selected by DOE in December, 1989 and the Cooperative Agreement approved in September, 1990. Construction, commissioning, and start-up of the ENCOAL mild coal gasification facility was completed in June of 1992, and the project is currently in the operations phase. Some plant modifications have been required and are discussed in this report.

  13. Umatilla River Basin Fish Habitat Enhancement : FY 1990 Annual Report.

    SciTech Connect

    Northrop, Michael

    1990-01-01

    During the summer of 1990, construction continued on the Bonneville Power Administration funded anadromous fish habitat enhancement project in the Umatilla River sub-basin, Umatilla County, State of Oregon. Work started on 5/1/90 and ended 10/30/90. A total of five large log weirs, eight large rock weirs, 17 associated weir structures, 19 small to medium rock deflectors, four bank and island reinforcements, three rock flow controls, 19 woody debris placements, and 85 individual boulders were constructed in the South Fork of the Umatilla River. In addition, one large rock weir was constructed at the confluence of the North and South Forks of the Umatilla River, and repair work was completed on 33 structures in Thomas Creek. Also, 300 cubic yards of rock and some logs and woody material were moved on site for use in 1991. Preconstruction activity consisted of moving approximately 1,500 cubic yards of large boulders, and dive log truck loads of woody material to the construction site. Project monitoring consisted of sediment sampling above and below the project area and, mapping and photographing and structures. 7 figs.

  14. 77 FR 52344 - Proposed Information Collection; Annual Certification of Hunting and Sport Fishing Licenses Issued

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ...-XXX-FF09W23000] Proposed Information Collection; Annual Certification of Hunting and Sport Fishing.... 669 et seq.) and the Dingell-Johnson Sport Fish Restoration Act (16 U.S.C. 777 et seq. except 777e-1... FWS Forms 3-154a (Part I--Certification) and 3- 154b (Part II--Summary of Hunting and Sport...

  15. Habitat Quality and Anadromous Fish Production Potential on the Warm Springs Indian Reservation: Annual Report 1987.

    SciTech Connect

    Heinith, Robert

    1987-12-01

    In 1987, The Warm Springs Indian Reservation Anadromous Fish Production and Habitat Improvement Program was in the sixth year of a scheduled eleven year program. To date, 21 kilometers of reservation stream habitat have been enhanced for salmonid production benefits. Unusual climatic conditions created a severe drought throughout the Warm Springs River Basin and Shitike Creek in 1987. Temperature extremes and low annual discharges ensued throughout reservation waters. Study sites, located in the Warm Springs River Basin and Shitike Creek, continued to be monitored for physical biological parameters. Post treatment evaluation of bioengineering work in Mill Creek (Strawberry Falls Project) was conducted. Despite low discharges, physical habitat parameters were improved and notable gains were observed in both spring chinook salmon (Oncorhynchus tshawytascha) and summer steelhead trout (Salmo gairdneri) abundance and biomass at post treatment sites. Major bioengineering work was completed at the Mill Creek (Potter's Pond) Site. 19 refs., 24 figs., 16 tabs.

  16. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and

  17. Augmented Fish Health Monitoring, 1987-1988 Annual Report.

    SciTech Connect

    Warren, James W.

    1988-08-01

    Augmented Fish Health Monitoring Contract DE-AI79-87BP35585 was implemented on July 20, 1987. First year highlights included remodeling of the Olympia (WA) Fish Health Center to provide laboratory space for histopathological support services to participating state agencies, acquisition of gas monitoring equipment for hatchery water systems, expanded disease detection work for bacterial kidney disease and erythrocytic inclusion body syndrome in fish stocks at 13 Columbia River Basin National Fish Hatcheries and advancements in computerized case history data storage and analysis. This report summarizes the health status of fish reared at Service facilities in the Columbia River basin, briefly describes work being done to meet contract requirements for fish disease surveillance at those hatcheries and provides a summary of case history data for calendar years 1984, 1985, 1986 and 1987. 1 ref.

  18. Fabricate and Install Yakima Basin Phase II Fish Screens; Washington Department of Fish and Wildlife, 2002-2003 Annual Report.

    SciTech Connect

    Schille, Patrick C.

    2004-03-01

    The goal of this project is to prevent mortality and/or injury to all life stages of anadromous and resident fish at irrigation diversions. Obsolete Yakima basin fish screens constructed in the 1930's, 40's, 50's, 60's, and 70's must be replaced or updated to comply with current regional fish screen biological protection criteria adopted by Columbia Basin Fish and Wildlife Authority (CBFWA), Fish Screening Oversight Committee (FSOC) in 1995. This goal is being accomplished through an on-going effort by the Yakima Basin Phase II Technical Work Group (TWG), which is comprised of local, state, federal, tribal and private groups who prioritizes and assign screening projects. Prioritized screening projects are completed through coordination between the Bureau of Reclamations (BOR), who design and permit, and the WDFW who fabricate the screens for these projects. The following is the 2004 fish screening facility construction schedule as proposed by the Bureau of Reclamation Design Group (USBR) and Fish Passage Technical Work Group (TWG).

  19. State of Idaho Augmented Anadromous Fish Health Monitoring, 1988 Annual Report.

    SciTech Connect

    Foott, J. Scott; Hauch, A. Kent

    1989-05-01

    This report documents the progress in the assigned tasks which have occurred during the second year of the Augmented Anadromous Fish Health Monitoring Project. Fish at seven Idaho Department of Fish and Game facilities were monitored for various pathogens and organosomatic analyses were performed on smolts prior to their release in the Spring of 1989. A disease database has been developed and facility impediments to fish health have been identified.

  20. Re-visiting projections of PCBs in Lower Hudson River fish using model emulation.

    PubMed

    Field, L Jay; Kern, John W; Rosman, Lisa B

    2016-07-01

    Remedial decision making at large contaminated sediment sites with bioaccumulative contaminants often relies on complex mechanistic models to forecast future concentrations and compare remedial alternatives. Remedial decision-making for the Hudson River PCBs Superfund site involved predictions of future levels of PCBs in Upper Hudson River (UHR) and Lower Hudson River (LHR) fish. This study applied model emulation to evaluate the impact of updated sediment concentrations on the original mechanistic model projections of time to reach risk-based target thresholds in fish in the LHR under Monitored Natural Attenuation (MNA) and the selected dredging remedy. The model emulation approach used a combination of nonlinear and linear regression models to estimate UHR water PCBs as a function of UHR sediment PCBs and to estimate fish concentrations in the LHR as a function of UHR water PCBs, respectively. Model emulation captured temporal changes in sediment, water, and fish PCBs predicted by the mechanistic model over the emulation period. The emulated model, using updated sediment concentrations and a revised estimate of recovery rate, matched the trend in annual monitoring data for white perch and largemouth bass in the LHR between 1997 and 2014. Our best predictions based on the emulated model indicate that the projected time to reach fish tissue risk-based thresholds in the LHR will take decades longer than the original mechanistic model projections. PMID:27017079

  1. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2003 Annual Report.

    SciTech Connect

    DeHart, Michele

    2004-09-01

    The runoff volumes in 2003 were below average for the January to July period above Lower Granite Dam (79%) and The Dalles Dam (82%). The year 2003 hydrosystem operations and runoff conditions resulted in flows that met the spring seasonal Biological Opinion flow objectives at Lower Granite Dam, McNary Dam and Priest Rapids Dam. However, summer seasonal flows at Lower Granite Dam and McNary Dam were considerably below the Biological Opinion objectives of 50.7 Kcfs at Lower Granite Dam and 2000 Kcfs at McNary Dam. Actual summer seasonal flows were just 32.3 Kcfs and 135.5 Kcfs, respectively. In most instances spill was provided as described by the Biological Opinion program for fish passage, within the constraints of the State waivers for total dissolved gas supersaturation levels. Spill was altered during spill testing and most notably during the month of August at Ice Harbor dam. At this project spill was modified from a 24-hour program to a 12-hour nightly spill period pending the evaluation of studies being conducted in-season. Spill was not returned to full implementation of the Biological Opinion levels even after data showed that spillway passage had the highest associated fish survival. This experience demonstrated the difficulty of managing the hydrosystem for fish passage based on preliminary data and data collected in-season. Increased hatchery releases and higher wild fish production resulted in a population of yearling chinook at Lower Granite Dam being one of the highest observed in recent years. However, the increased hatchery production may have been offset to some extent by decreased survival from release to Lower Granite Dam as suggested by the lower than average survival observed for the PIT tagged trap released fish to Lower Monumental Dam. Travel times were also longer for hatchery spring chinook compared to recent past years. The short duration of high flows that occurred in the Lower Snake River was too late for yearling chinook, but likely was

  2. Ferrocyanide Safety Project: FY 1991 annual report

    SciTech Connect

    Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

    1992-06-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy's Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

  3. Ferrocyanide Safety Project: FY 1991 annual report

    SciTech Connect

    Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

    1992-06-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy`s Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

  4. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2000 Annual Report.

    SciTech Connect

    DeHart, Michele

    2001-06-01

    plan, spill hours were increased at Lower Monumental Dam. Spill volume at The Dalles was reduced and daytime spill tests were conducted at John Day and Bonneville Dams. Although provided for fish, most spill that occurred in 2000 was either in excess of project hydraulic capacity or excess generation. This effectively reduced the actual cost of the spill program. For the most part, spill in 2000 was managed to the waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. Hatchery spring chinook returns comprised an estimated 81.4% of the total spring chinook adult return to Lower Granite Dam. Smolt travel time and survival were similar to past years for most Smolt Monitoring Program groups. The notable exceptions were Snake River hatchery steelhead groups and mid-Columbia hatchery sub-yearling groups from Wells and Ringold hatcheries, which had significantly lower survival than previous years. Yearling chinook travel time showed variation from past years, reflecting the atypical flow shape in 2000 which had high flows in April, declining through May.

  5. Benefits of fish passage and protection measures at hydroelectric projects

    SciTech Connect

    Cada, G.F.; Jones, D.W.

    1993-06-01

    The US Department of Energy`s Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations.

  6. Yakima River Basin Fish Passage Phase II Fish Screen Construction, Project Completion Report.

    SciTech Connect

    Hudson, R. Dennis

    2008-01-01

    On December 5, 1980, Congress passed the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501). The Act created the Northwest Power Planning Council (now the Northwest Power and Conservation Council). The Council was charged with the responsibility to prepare a Regional Conservation and Electric Power Plan and to develop a program to protect, mitigate, and enhance fish and wildlife including related spawning grounds and habitat on the Columbia River and its tributaries. The Council adopted its Fish and Wildlife Program on November 15, 1982. Section 800 of the Program addresses measures in the Yakima River Basin. The Yakima measures were intended to help mitigate hydroelectric impacts in the basin and provide off-site mitigation to compensate for fish losses caused by hydroelectric project development and operations throughout the Columbia River Basin. The Bonneville Power Administration (BPA) was designated as a major source of funding for such off-site mitigation measures and was requested to initiate discussions with the appropriate Federal project operators and the Council to determine the most expeditious means for funding and implementing the program. The primary measures proposed for rapid implementation in the Yakima River basin were the installation of fish passage and protective facilities. Sec. 109 of The Hoover Power Plant Act of 1984, authorized the Secretary of the Interior to design, construct, operate, and maintain fish passage facilities within the Yakima River Basin. Under Phase I of the program, improvements to existing fish passage facilities and installation of new fish ladders and fish screens at 16 of the largest existing diversion dams and canals were begun in 1984 and were completed in 1990. The Yakima Phase II fish passage program is an extension of the Phase I program. In 1988, the Yakama Nation (YN) submitted an application to amend Sections 803(b) and 1403(4.5) of the Northwest Power and Conservation Council

  7. 75 FR 5626 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA INT-DES...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... of Reclamation (Reclamation) published a notice in the Federal Register on April 8, 2009 (74 FR 16007... Fish Passage Facilities and Fish Reintroduction Project. The Washington State Department of Ecology...

  8. Steam Generator Group Project. Annual report, 1982

    SciTech Connect

    Clark, R.A.; Lewis, M.

    1984-02-01

    The Steam Generator Group Project (SGGP) is an NRC program joined by additional sponsors. The SGGP utilizes a steam generator removed from service at a nuclear plant (Surry 2) as a vehicle for research on a variety of safety and reliability issues. This report is an annual summary of progress of the program for 1982. Information is presented on the Steam Generator Examination Facility (SGEF), especially designed and constructed for this research. Loading of the generator into the SGEF is then discussed. The report then presents radiological field mapping results and personnel exposure monitoring. This is followed by information on field reduction achieved by channel head decontaminations. The report then presents results of a secondary side examination through shell penetrations placed prior to transport, confirming no change in generator condition due to transport. Decontamination of the channel head is discussed followed by plans for eddy current testing and removal of the plugs placed during service. Results of a preliminary profilometry examination are then provided.

  9. Field Review of Fish Habitat Improvement Projects in Central Idaho.

    SciTech Connect

    Beschta, Robert L.; Griffith, Jack; Wesche, Thomas A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho.

  10. StreamNet Project : Annual Report Fiscal Year 2008.

    SciTech Connect

    Schmidt, Bruce; Roger, Phil; Oftedahl, Lenora

    2008-12-12

    development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project

  11. Augmented Fish Health Monitoring for Washington Department of Wildlife, 1989 Annual Report.

    SciTech Connect

    Kerwin, John L.; Roberts, Steve; Oman, Leni; Bolding, Bruce

    1991-04-01

    The augmented fish health monitoring project is funded by the Bonneville Power Administration (BPA) with the mandate to collect fish health data on anadromous fish stocks of the BPA Columbia River Basin in a standardized manner. The project began in 1986 and the data reported here was collected in the fourth year. This segment of the project was carried out by the Washington Department of Wildlife and summarizes fish health findings at anadromous game fish hatcheries in Washington State operated by the BPA. Information gathered to data has provided impetus to alter facility design and management practices for improved fish health through prevention. Treatment efficacy can be better assessed due to the monthly monitoring of fish stocks and insight is being gained into disease prevention and control. The ultimate goal, of course, is to improve fish health for better survival in the wild. Tagged returns at index hatcheries within this project area will provide some indication of the impact of improving fish health on providing greater adult returns as well as an improved product for the fishery. 3 refs., 2 figs., 16 tabs.

  12. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2002 Annual Report.

    SciTech Connect

    DeHart, Michele; Berggren, Thomas J.; Filardo, Margaret

    2003-09-01

    The runoff volumes in 2002 were near average for the January to July period above Lower Granite Dam (80%) and The Dalles Dam (97%). The year 2002 hydrosystem operations and runoff conditions resulted in flows that were less than the seasonal Biological Opinion (Opinion) flow objectives at Lower Granite Dam for both the spring and summer period. The seasonal flow objectives for Priest Rapids and McNary dams were exceeded for the spring period, but at McNary Dam summer flow objectives were not met. While seasonal flow objectives were exceeded for the spring at McNary Dam, the 2002 season illustrated that Biological Opinion management to seasonal flow targets can result in conditions where a major portion of the juvenile fish migration migrates in conditions that are less than the flow objectives. The delay in runoff due to cool weather conditions and the inability of reservoirs to augment flows by drafting lower than the flood control elevations, resulted in flows less than the Opinion objectives until May 22, 2002. By this time approximately 73% of the yearling chinook and 56% of steelhead had already passed the project. For the most part, spill in 2002 was managed below the gas waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. The exception was at Lower Monumental Dam where no Biological Opinion spill occurred due to the need to conduct repairs in the stilling basin. Survival estimates obtained for PIT tagged juveniles were similar in range to those observed prior to 2001. A multi-year analysis of juvenile survival and the factors that affect it was conducted in 2002. A water transit time and flow relation was demonstrated for spring migrating chinook and steelhead of Snake River and Mid Columbia River origin. Returning numbers of adults observed at Bonneville Dam declined for spring chinook, steelhead and coho, while summer and fall chinook numbers increased. However, all numbers were far greater

  13. An empirical model for estimating annual consumption by freshwater fish populations

    USGS Publications Warehouse

    Liao, H.; Pierce, C.L.; Larscheid, J.G.

    2005-01-01

    Population consumption is an important process linking predator populations to their prey resources. Simple tools are needed to enable fisheries managers to estimate population consumption. We assembled 74 individual estimates of annual consumption by freshwater fish populations and their mean annual population size, 41 of which also included estimates of mean annual biomass. The data set included 14 freshwater fish species from 10 different bodies of water. From this data set we developed two simple linear regression models predicting annual population consumption. Log-transformed population size explained 94% of the variation in log-transformed annual population consumption. Log-transformed biomass explained 98% of the variation in log-transformed annual population consumption. We quantified the accuracy of our regressions and three alternative consumption models as the mean percent difference from observed (bioenergetics-derived) estimates in a test data set. Predictions from our population-size regression matched observed consumption estimates poorly (mean percent difference = 222%). Predictions from our biomass regression matched observed consumption reasonably well (mean percent difference = 24%). The biomass regression was superior to an alternative model, similar in complexity, and comparable to two alternative models that were more complex and difficult to apply. Our biomass regression model, log10(consumption) = 0.5442 + 0.9962??log10(biomass), will be a useful tool for fishery managers, enabling them to make reasonably accurate annual population consumption predictions from mean annual biomass estimates. ?? Copyright by the American Fisheries Society 2005.

  14. Harmonizing and Optimizing Fish Testing Methods: The OECD Framework Project

    EPA Science Inventory

    The Organisation for Economic Cooperation and Development (OECD) serves a key role in the international harmonization of testing of a wide variety of chemicals. An integrated fish testing framework project was initiated in mid-2009 through the OECD with the US as the lead country...

  15. 75 FR 60804 - Nimbus Hatchery Fish Passage Project, Lower American River, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Bureau of Reclamation Nimbus Hatchery Fish Passage Project, Lower American River, California AGENCY... Reclamation, the lead Federal agency, and the California Department of Fish and Game (CDFG), acting as the... Hatchery Fish Passage Project (Project). The purpose of the Project is to create and maintain a...

  16. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    SciTech Connect

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are

  17. Augmented Fish Health Monitoring for Washington Department of Wildlife, 1988 Annual Report.

    SciTech Connect

    Gearheard, Jim

    1988-10-01

    The augmented fish health monitoring project is funded by the Bonneville Power Administration with the mandate to collect fish health data on anadromous fish stocks of the Columbia River Basin in a standardized manner. The project began in 1986 and the data reported here was collected in the third year. This segment of the project was carried out by the Washington Department of Wildlife and summarizes fish health findings at anadromous game hatcheries in Washington State operated by the BPA. Information gathered to date has provided impetus to alter facility design and management practices for improved fish health through prevention. Treatment efficacy can be better assessed due to the monthly monitoring of fish stocks and insight is being gained into disease prevention and control. The ultimate goal, of course, is to improve fish health for better survival in the wild. Tagged returns at index hatcheries within this project area will indicate the impact of improving fish health on providing greater adult returns as well as an improved product for the fishery. 2 refs., 3 figs., 15 tabs.

  18. Box Canyon Model Watershed Project : Annual Report 1997/1998.

    SciTech Connect

    Kalispel Natural Resource Department

    1998-01-01

    In 1997, the Kalispel Natural Resource Department (KNRD) initiated the Box Canyon Watershed Project. This project will concentrate on watershed protection and enhancement from an upland perspective and will complement current instream restoration efforts implemented through the Kalispel Resident Fish Project. Primary focus of this project is the Cee Cee Ah Creek watershed due to its proximity to the Reservation, importance as a traditional fishery, and potential for bull trout and west-slope cutthroat trout recovery.

  19. Hangman Restoration Project, Annual Report 2002-2003.

    SciTech Connect

    Coeur d'Alene Tribe

    2003-10-01

    Progress has been made in defining the level of work that needs to be accomplished in the Hangman Watershed in order to restore a viable riparian system and hydrology. The end goal is to use wildlife habitat to protect streams and provide water for instream fish habitats. In order to define the most expedient means of attaining that goal an Instream Flow/Watershed Hydrology Study was initiated. The study is intended to be comprehensive in order to determine the potential of increasing base flow with Hangman Watershed Streams and predict available fish habitats for the range of flow level possibilities. The Study Plan and work for the first field season was contracted and the Plan and end of field season reports are included with this Annual Report. The initial draft of the wildlife portion of the Monitoring and Evaluation Plan was completed and presented to the Columbia Basin Fish and Wildlife Authority Wildlife Committee. The Committee felt that the Basin Hydrology Study needed to be closer to completion before the bulk of wildlife monitoring should be implemented. The extent of the landscape that must be restored in order to facilitate the needed stream flows may not be large enough to affect the population levels of the Plan's target species. The main result of the Committee review of the Monitoring and Evaluation Plan however, was that since the Hangman Restoration Project is not a HU driven wildlife mitigation project than the Wildlife Committee does not have a role to play since their focus is wildlife HU crediting projects. Further work on the wildlife portion of the Monitoring and Evaluation Plan is suspended until the crediting issues surrounding the Hangman Restoration Project are settled. Certain aspects of the Plan, such as the land bird, amphibian, reptile and beaver monitoring can be implemented in the spring of the coming year because monitoring these species and groups needs to be accomplished regardless of crediting status and baseline data is

  20. Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report.

    SciTech Connect

    Hooley, Sharon

    2009-03-20

    A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March

  1. State of Washington Augmented Anadromous Fish Health Monitoring, 1986 Annual Report.

    SciTech Connect

    Gearheard, Jim; Amos, Kevin

    1987-05-01

    This document contains two papers on fish health and disease prepared by separate agencies but as part of a common effort. The entire report represents the annual progress report on the subject by the Bonneville Power Administration. Each of the individual reports were processed separately for the data base. (TEM)

  2. Walla Walla River Basin Fish Screens Evaluations, 2006 Annual Report.

    SciTech Connect

    Chamness, Mickie; Abernethy, Scott; Tunnicliffe, Cherylyn

    2007-01-01

    Pacific Northwest National Laboratory evaluated Gardena Farms, Little Walla Walla, and Garden City/Lowden II Phase II fish screen facilities and provided underwater videography beneath a leaking rubber dam in the Walla Walla River basin in 2006. Evaluations of the fish screen facilities took place in early May 2006, when juvenile salmonids are generally outmigrating. At the Gardena Farms site, extended high river levels caused accumulations of debris and sediment in the forebay. This debris covered parts of the bottom drum seals, which could lead to early deterioration of the seals and drum screen. Approach velocities were excessive at the upstream corners of most of the drums, leading to 14% of the total approach velocities exceeding 0.4 feet per second (ft/s). Consequently, the approach velocities did not meet National Marine Fisheries Service (NMFS) design criteria guidelines for juvenile fish screens. The Little Walla Walla site was found to be in good condition, with all approach, sweep, and bypass velocities within NMFS criteria. Sediment buildup was minor and did not affect the effectiveness of the screens. At Garden City/Lowden II, 94% of approach velocities met NMFS criteria of 0.4 ft/s at any time. Sweep velocities increased toward the fish ladder. The air-burst mechanism appears to keep large debris off the screens, although it does not prevent algae and periphyton from growing on the screen face, especially near the bottom of the screens. In August 2006, the Gardena Farm Irrigation District personnel requested that we look for a leak beneath the inflatable rubber dam at the Garden City/Lowden II site that was preventing water movement through the fish ladder. Using our underwater video equipment, we were able to find a gap in the sheet piling beneath the dam. Erosion of the riverbed was occurring around this gap, allowing water and cobbles to move beneath the dam. The construction engineers and irrigation district staff were able to use the video

  3. Influence of Habitat Modifications on Habitat Composition and Anadromous Salmonid Populations in Fish Creek, Oregon, 1983-1988 Annual Report.

    SciTech Connect

    Reeves, Gordon H.; Everest, Fred H.; Hohler, David B.

    1990-05-01

    Modification of degraded habitats to increase populations of anadromous salmonids is a major focus of management agencies throughout the Pacific Northwest. Millions of dollars are spent annually on such efforts. Inherent in implementing habitat improvements is the need for quantitative evaluation of the biological and physical effects of such work. Reeves et al. (in press), however, noted that such evaluations are rare, making it difficult to assess the true results of habitat work. While it is not economically possible to thoroughly evaluate every habitat project, it is essential that intensive evaluations be done on selected representative projects. One such evaluation program has been underway since 1982 on Fish Creek, a tributary of the Clackamas River near Estacada, OR. Habitat modification has been done by the USDA Forest Service, Estacada Ranger District, Mt. Hood National Forest with funding provided in part by the Bonneville Power Administration (BPA). The USDA Forest Service, Anadromous Fish Habitat Research Unit, Pacific Northwest Research Station (PNW), Corvallis, OR is charged with: (1) evaluating the biological and physical responses to habitat modifications on a basin scale; and (2) developing a cost-benefit analysis of the program. Preliminary results have been reported in a series of annual publications, Everest and Sedell 1983, 1984 and Everest et al. 1985, 1986, 1987, 1988. The objectives of this paper are to: (1) report 1988 observations of biological and physical changes in habitat, salmonid populations, and smolt production in Fish Creek, and (2) examine preliminary trends in fish habitat and populations related to habitat improvement over the period 1983-1988. We have prefaced the trends in the latter objective as preliminary because we believe it could take a minimum of 10 years before the full biological and physical responses to habitat work are realized. We therefore urge caution in interpreting these preliminary results.

  4. Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    SciTech Connect

    Riggin, Stacey H.; Hansen, H. Jerome

    1992-10-01

    The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and instream flows are issues of public concern that will be directly affected by the timing and quantity of water rental releases for salmon flow augmentation, The potential of renting water from Idaho rental pools for salmon flow augmentation is complicated by institutional impediments, competition from other water users, and dry year shortages. Water rental will contribute to a reduction in carryover storage in a series of dry years when salmon flow augmentation is most critical. Such a reduction in carryover can have negative impacts on reservoir fisheries by eliminating shoreline spawning beds, reducing available fish habitat

  5. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2001 Annual Report.

    SciTech Connect

    DeHart, Michele

    2002-07-01

    Extremely poor water conditions within the Columbia River Basin along with extraordinary power market conditions created an exceptionally poor migration year for juvenile salmon and steelhead. Monthly 2001 precipitation at the Columbia above Grand Coulee, the Snake River above Ice Harbor, and the Columbia River above The Dalles was approximately 70% of average. As a result the 2001 January-July runoff volume at The Dalles was the second lowest in Columbia River recorded history. As a compounding factor to the near record low flows in 2001, California energy deregulation and the resulting volatile power market created a financial crisis for the Bonneville Power Administration (BPA). Power emergencies were first declared in the summer and winter of 2000 for brief periods of time. In February of 2001, and on April 3, the BPA declared a ''power emergency'' and suspended many of the Endangered Species Act (ESA) and Biological Opinion (Opinion) measures that addressed mainstem Columbia and Snake Rivers juvenile fish passage. The river and reservoir system was operated primarily for power generation. Power generation requirements in January through March coincidentally provided emergence and rearing flows for the Ives-Pierce Islands spawning area below Bonneville Dam. In particular, flow and spill measures to protect juvenile downstream migrant salmon and steelhead were nearly totally suspended. Spring and summer flows were below the Opinion migration target at all sites. Maximum smolt transportation was implemented instead of the Opinion in-river juvenile passage measures. On May 16, the BPA Administrator decided to implement a limited spill for fish passage at Bonneville and The Dalles dams. On May 25, a limited spill program was added at McNary and John Day dams. Spill extended to July 15. Juvenile migrants, which passed McNary Dam after May 21, experienced a noticeable, improved survival, as a benefit of spill at John Day Dam. The suspension of Biological Opinion

  6. Colville Tribal Fish Hatchery, 2002-2003 Annual Report.

    SciTech Connect

    Fairgrieve, William; Christensen, David

    2004-04-01

    The Colville Tribal Hatchery produced 62,335 pounds of trout during the contract period, however, only 46,092 pounds were liberated to lakes and streams. The remaining production will be carried over to 2004 to be planted as larger fish into reservation waters for the lakes opener. New raceways were completed in November and brought on line in the spring. These raceways currently hold the redband rainbow brood stock and will be spawned in 2004. Efforts are continuing to capture redbands from other streams in coordination with the monitoring and evaluation program. Creel was expanded by hiring a second creel clerk to give better coverage of reservation waters by reducing travel time. Marking continues on all fish planted from CTH and refinements continue to be made. The first tag retention study has been completed and the second study is now underway to determine long term tag recognition. Lakes continue to be surveyed to complete the baseline analysis of all reservation lakes and will be completed in 2004.

  7. Annual Report on Resident Fish Activities, 1986 Fiscal Year, Columbia River Basin Fish and Wildlife Program, Action Item 41.8.

    SciTech Connect

    United States. Bonneville Power Administration.

    1986-05-01

    This report addresses the status of resident fish projects currently funded by the Bonneville Power Administration (BPA) under the Columbia River Basin Fish and Wildlife Program (Program) established pursuant to the Northwest Power Act (P.L. 96-501). The report provides a brief synopsis, review and discussion of 13 resident fish projects funded during September 1985 to May 1986. The resident fish section of the Program addresses measures which are intended to protect resident fish, mitigate fishery losses caused by hydroelectric projects, and compensate for past losses through enhancement measures. These measures include, but are not limited to: flow requirements, drawdown requirements, temperature control, and streambed protection.

  8. Project TRREE 2009-2010 Annual Report

    ERIC Educational Resources Information Center

    Atwell, Nedra

    2010-01-01

    Project TRREE (Teacher Recruitment and Retention for Educational Excellence) is a federally funded project conducted by the Kentucky Department of Education. The purpose of the project is to develop a systemic approach to increase the number of highly qualified special education teachers with a focus on recruitment of linguistically, culturally…

  9. Oregon Migrant Health Project; Annual Progress Report 1969.

    ERIC Educational Resources Information Center

    Oregon State Board of Health, Portland.

    In this 1969 annual report, 10 objectives of the Oregon Migrant Health Project--which served approximately 18,400 migrants during the project year--are listed. These objectives relate to providing for diagnostic and medical services, preventive medical services, and dental care, as well as promoting health awareness, education, and improved living…

  10. Smolt Migration Characteristics and Mainstem Snake and Columbia River Detection Rates of PIT-Tagged Grande Ronde and Imnaha River Naturally Produced Spring Chinook Salmon, Annual Reports 1993, 1994, 1995 : Fish Research Project, Oregon.

    SciTech Connect

    Walters, Timothy R.; Carmichael, Richard W.; Keefe, MaryLouise

    1996-04-01

    This reports on the second, third, and fourth years of a multi-year study to assess smolt migration characteristics and cumulative detection rates of naturally produced spring chinook salmon (Oncorhynchus tshawytscha) from Northeast Oregon streams. The goal of this project is to develop an understanding of interpopulational and interannual variation in several early life history parameters of naturally produced spring and summer chinook salmon in the Grande Ronde and Imnaha River subbasins. This project will provide information to assist chinook salmon population recovery efforts. Specific populations included in the study are: (1) Catherine Creek; (2) Upper Grande Ronde River; (3) Lostine River; (4) Imnaha River; (5) Wenaha River; and (6) Minam River. In this document, the authors present findings and activities from research completed in 1993, 1994, and 1995.

  11. Investigations into the Early Life History of Naturally Produced Spring Chinook Salmon in the Grande Ronde Riiver Basin : Fish Research Project Oregon : Annual Progress Report 1 September 1995 to 1 August 1996.

    SciTech Connect

    Jonasson, Brian C.; Carmichael, Richard W.; Keefe, MaryLouise

    1997-09-01

    Historically, the Grande Ronde River produced an abundance of salmonids including stocks of spring, summer and fall chinook salmon, sockeye salmon, coho salmon, and summer steelhead. During the past century, numerous factors have caused the reduction of salmon stocks such that only sustainable stocks of spring chinook salmon and summer steelhead remain. The sizes of spring chinook salmon populations in the Grande Ronde River basin also have been declining steadily and are substantially depressed from estimates of historic levels. In addition to a decline in population abundance, a reduction of spring chinook salmon spawning distribution is evident in the Grande Ronde River basin. Numerous factors are thought to contribute to the decline of spring chinook salmon in the Snake River and its tributaries. These factors include passage problems and increased mortality of juvenile and adult migrants at mainstem Columbia and Snake river dams, overharvest, and habitat degradation associated with timber, agricultural, and land development practices. This study was designed to describe aspects of the life history strategies exhibited by spring chinook salmon in the Grande Ronde River basin. During the past year the focus was on rearing and migration patterns of juveniles in the upper Grande Ronde River and Catherine Creek. The study design included three objectives: (1) document the annual in-basin migration patterns for spring chinook salmon juveniles in the upper Grande Ronde River and Catherine Creek, including the abundance of migrants, migration timing and duration; (2) estimate and compare smolt survival indices to mainstem Columbia and Snake river dams for fall and spring migrating spring chinook salmon; and (3) determine summer and winter habitat utilization and preference of juvenile spring chinook salmon in the upper Grande Ronde River and Catherine Creek.

  12. Extremely short lifespan in the annual fish Nothobranchius furzeri.

    PubMed Central

    Valdesalici, Stefano; Cellerino, Alessandro

    2003-01-01

    Evolutionary theories of senescence postulate that lifespan is determined by the age-dependent decrease in the effects of natural selection. Factors that influence survival and reproduction at early life stages have a larger impact on fitness than factors that influence later life stages. According to these views, selection for rapid sexual maturation and a steep age-dependent decrease in fitness drive the evolution of short lifespans. Here, we report on the survival trajectory of Nothobranchius furzeri (Pisces: Ciprinodontidae): a member of a group of annual species found in temporary bodies of water whose life expectancy in the wild is limited to a few months. We find that maximum survival of N. furzeri in the laboratory is less than 12 weeks. The temporal trajectory of survival shows an age-dependent increase in the mortality rate that is typical of organisms with defined lifespans. The lifespan of N. furzeri is exceptionally short for a vertebrate: owing to its small size and the possibility of propagation in captivity, N. furzeri could be used as a convenient model for ageing research. PMID:14667379

  13. FY 2014 LDRD Annual Report Project Summaries

    SciTech Connect

    Tomchak, Dena

    2015-02-01

    The FY 2014 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support future DOE missions and national research priorities. LDRD is essential to INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enahnces technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development.

  14. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program, 2001 Annual Report.

    SciTech Connect

    Combs, Mitch

    2002-01-01

    Sherman Creek Hatchery's primary objective is the restoration and enhancement of the recreational and subsistence fishery in Lake Roosevelt and Banks Lake. The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operations and evaluations. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. The Washington Department of Fish and Wildlife, Spokane Tribe of Indians and the Colville Confederated Tribe form the interagency Lake Roosevelt Hatcheries Coordination Team (LRHCT) which sets goals and objectives for both Sherman Creek and the Spokane Tribal Hatchery and serves to coordinate enhancement efforts on Lake Roosevelt and Banks Lake. The primary changes have been to replace the kokanee fingerling program with a yearling (post smolt) program of up to 1,000,000 fish. To construct and operate twenty net pens to handle the increased production. The second significant change was to rear up to 300,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Current objectives include increased use of native/indigenous stocks where available for propagation into Upper Columbia River Basin Waters. Monitoring and evaluation is preformed by the Lake Roosevelt Fisheries Monitoring Program. From 1988 to 1998, the principle sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and kokanee and the economic value of the fishery has increased substantially during this 10-year period. The most recent information from the

  15. Evaluation and Monitoring of Idaho Habitat Enhancement and Anadromous Fish Natural Production : Annual Report 1986.

    SciTech Connect

    Petrosky, Charles E.; Holubetz, Terry B.

    1987-11-01

    The Idaho Department of Fish and Game (IDFG) has been conducting an evaluation of existing and proposed habitat improvement projects for anadromous fish in the Clearwater River and Salmon River drainages over the last 3 years. Projects included in the evaluation are funded by or proposed for funding by the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. This evaluation project is also funded under the same authority. A mitigation record is being developed to use increased smolt production (i.e., yield) at full-seeding as the best measure of benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded measuring full benefits of any habitat enhancement project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration.

  16. A computer program for estimating fish population sizes and annual production rates

    SciTech Connect

    Railsback, S.F.; Holcomb, B.D.; Ryon, M.G.

    1989-10-01

    This report documents a program that estimates fish population sizes and annual production rates in small streams from multiple-pass sampling data. A maximum weighted likelihood method is used to estimate population sizes (Carle and Strub, 1978), and a size-frequency method is used to estimate production (Garman and Waters, 1983). The program performs the following steps: (1) reads in the data and performs error checking; (2) where required, uses length-weight regression to fill in missing weights; (3) assigns length classes to the fish; (4) for each date, species, and length class, estimates the population size and its variance; (5) for each date and species, estimates the total population size and its variance; and (6) for each species, estimates the annual production rate and its variance between sampling dates selected by the user. If data from only date are used, only populations are estimated. 9 refs.

  17. Washington Phase II Fish Diversion Screen Evaluations in the Yakima River Basin, 2002 Annual Report.

    SciTech Connect

    Carter, J.; McMichael, G.; Chamness, M.

    2003-01-01

    In 2002, the Pacific Northwest National Laboratory evaluated 23 Phase II fish screen sites in the Yakima River Basin as part of a multi-year project for the Bonneville Power Administration on the effectiveness of fish screening devices. Pacific Northwest National Laboratory collected data to determine whether velocities in front of the screens and in the bypasses met National Marine Fisheries Service criteria to promote safe and timely fish passage and whether bypass outfall conditions allowed fish to safely return to the river. In addition, Pacific Northwest National Laboratory conducted underwater video surveys to evaluate the environmental and operational conditions of the screen sites with respect to fish passage. Based on evaluations in 2002, PNNL concluded that: (1) In general, water velocity conditions at the screen sites met fish passage criteria set by the National Marine Fisheries Service. (2) Conditions at most facilities would be expected to provide for safe juvenile fish passage. (3) Conditions at some facilities indicate that operation and/or maintenance should be modified to increase safe juvenile fish passage. (4) Automated cleaning brushes generally functioned properly; chains and other moving parts were typically well greased and operative. (5) Removal of sediment buildup and accumulated leafy and woody debris should be improved at some sites.

  18. Phenotype flexibility in wild fish: Dolly Varden regulate assimilative capacity to capitalize on annual pulsed subsidies.

    PubMed

    Armstrong, Jonathan B; Bond, Morgan H

    2013-09-01

    1. Large digestive organs increase rates of energy gain when food is plentiful but are costly to maintain and increase rates of energy loss when food is scarce. The physiological adaptations to this trade-off differ depending on the scale and predictability of variation in food abundance. 2. Currently, there is little understanding of how animals balance trade-offs between the cost and capacity of the digestive system in response to resource pulses: rare, ephemeral periods of resource superabundance. We investigated the physiological and behavioural tactics of the fish Dolly Varden (Salvelinus malma) that rear in watersheds with low in situ productivity, but experience annual resource pulses from the spawning migrations of Pacific salmon. The eggs of Pacific salmon provide high-energy food for Dolly Varden. 3. Dolly Varden sampled 6 weeks prior to the resource pulse exhibited atrophy of the stomach, pyloric caeca, intestine and liver. Throughout the portion of the growing season prior to the resource pulse, fish exhibited empty stomachs, low indices of energy condition and muscle isotope signatures reflecting the previous resource pulse. 4. During the resource pulse, Dolly Varden exhibited large digestive machinery, gorged on salmon eggs and rapidly stored energy in fat reserves, somatic growth and gonad development. Dolly Varden appeared to achieve nearly their entire annual energy surplus during the ∼ 5-week period when sockeye salmon spawn. 5. Digestive flexibility provides Dolly Varden the energy efficiency required to survive and reproduce when resource abundance is concentrated into an annual pulse that is predictable, yet highly ephemeral. Although fish are known to incur extremely variable energy budgets, our study is one of the first to document digestive flexibility in wild fish. Our study emphasizes that fish can rely heavily on rare, high-magnitude foraging opportunities. Human actions that attenuate spikes in food abundance may have stronger than

  19. Augmented Fish Health Monitoring in Idaho, 1989-1990 Annual Report.

    SciTech Connect

    Hauck, A. K.

    1990-10-01

    The Idaho augmented fish health monitoring contract DE-A179-87BP65903 was awarded in June 1987 and fully implemented in January 1988. The third annual report of activities serviced under this contract is presented. The prevailing fish health problems in 1989 include persistent infections caused by infectious pancreatic necrosis virus (IPNV), by Myxobolus (Myxosoma) cerebralis, Renibacterium salmoninarum and drug resistant Aeromonas salmonicida at select hatcheries on Idaho's upper Columbia River tributaries. Administrative focus during the year was to fill vacant positions and still maintain the monitoring effort at levels agreed on under contract. Complete diagnostic and inspection services were provided to eleven Idaho anadromous facilities. The present report describes work done to meet contract agreements and summarizes the fish health findings of anadromous stocks reared at and returning to Idaho's facilities during 1989.

  20. LLNL NESHAPs project 1997 annual report

    SciTech Connect

    Gallegos, G.M.

    1998-06-01

    NESHAP`s limits the emission of radionuclides to the ambient air from DOE facilities to levels resulting in an annual effective dose equivalent (EDE) of 10 mrem (100 ({mu}Sv) to any member of the public The EDEs for the Lawrence Livermore National Laboratory (LLNL) site- wide maximally exposed members of the public from 1997 operations were Livermore site. 0 097 mrem (0 97 {mu}Sv) (80% from point-source emissions), 20% from diffuse-source emissions), Site 300 0 014 mrem (O 14 {mu}Sv) (38% from point-source emissions, 62% from diffuse-source emissions) The EDEs were generally calculated using the EPA-approved CAP88-PC air- dispersion/dose-assessment model Site-specific meteorological data, stack flow data, and emissions estimates based on radionuclide inventory data or continuous-monitoring systems data were the specific input to CAP88-PC for each modeled source.

  1. LLNL NESHAPs project. 1992 annual report

    SciTech Connect

    Surano, K.A.; Failor, R.A.; Biermann, A.H.; Berger, R.L.; Harrach, R.J.

    1993-05-01

    This report summarizes work conducted during FY 1992 for the Environmental Monitoring and Analysis Division of the Environmental Protection Department at Lawrence Livermore National Laboratory (LLNL). This document contains information regarding environmental monitoring of a wide variety of radioisotopes which are emitted to the atmosphere. These radioisotopes include transuranics, biomedical tracers, tritium, mixed fission products, and other radioisotopes used for general research and nuclear weapons research. Information regarding radionuclide air emissions for each of the 56 buildings at LLNL where radionuclides are used or activation products occur is given. Detailed information is included for all point source emissions from 43 LLNL site buildings. In addition, dose equivalents and dose assessment are evaluated. Reported annual releases are based on inventory data and unabated EPA potential release fractions for unmonitored sources, and on actual emission measurements for continuously monitored facilities.

  2. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    SciTech Connect

    Sellman, Jake; Dykstra, Tim

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality

  3. National Writing Project 2008 Annual Report

    ERIC Educational Resources Information Center

    National Writing Project (NJ1), 2008

    2008-01-01

    Writing in its many forms is the signature means of communication in the 21st century. This simple truth heightens the urgency to help all of our nation's students become strong writers and effective communicators. The National Writing Project (NWP) pursues this goal by focusing the knowledge, expertise, and leadership of the nation's educators on…

  4. Oak Grove Fork Habitat Improvement Project, 1988 Annual Report.

    SciTech Connect

    Bettin, Scott

    1989-04-01

    The Lower Oak Grove Fork of the Clackamas River is a fifth-order tributary of the Clackamas River drainage supporting depressed runs of coho and chinook salmon, and summer and winter steelhead. Habitat condition rating for the Lower Oak Grove is good, but smelt production estimates are below the average for Clackamas River tributaries. Limiting factors in the 3.8 miles of the Lower Oak Grove supporting anadromous fish include an overall lack of quality spawning and rearing habitat. Beginning in 1986. measures to improve fish habitat in the Lower Oak Grove were developed in coordination with the Oregon Department of Fish and Wildlife (ODF&W) and Portland General Electric (PGE) fisheries biologists. Prior to 1986, no measures had been applied to the stream to mitigate for PGE's storage and regulation of flows in the Oak Grove Fork (Timothy Lake, Harriet Lake). Catchable rainbow trout are stocked by ODF&W two or three times a year during the trout fishing season in the lowermost portion of the Oak Grove Fork near two Forest Service campgrounds (Ripplebrook and Rainbow). The 1987 field season marked the third year of efforts to improve fish habitat of the Lower Oak Grove Fork and restore anadromous fish production. The efforts included the development of an implementation plan for habitat improvement activities in the Lower Oak Grove Fork. post-project monitoring. and maintenance of the 1986 improvement structures. No new structures were constructed or placed in 1987. Fiscal year 1988 brought a multitude of changes which delayed implementation of plans developed in 1987. The most prominent change was the withdrawal of the proposed Spotted Owl Habitat Area (SOHA) which overlapped the Oak Grove project implementation area. Another was the change in the Forest Service biologist responsible for implementation and design of this project.

  5. Washington Phase II Fish Diversion Screen Evaluations in the Yakima River Basin, 2003 Annual Report.

    SciTech Connect

    Vucelick, J.; McMichael, G.; Chamness, M.

    2004-05-01

    In 2003, the Pacific Northwest National Laboratory (PNNL) evaluated 23 Phase II fish screen sites in the Yakima River Basin as part of a multi-year project for the Bonneville Power Administration on the effectiveness of fish screening devices. PNNL collected data to determine whether velocities in front of the screens and in the bypasses met the National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries, formerly the National Marine Fisheries Service [NMFS]) criteria to promote safe and timely fish passage. In addition, PNNL conducted underwater video surveys to evaluate the environmental and operational conditions of the screen sites with respect to fish passage. Based on evaluations in 2003, PNNL concluded that: (1) In general, water velocity conditions at the screen sites met fish passage criteria set by the NOAA Fisheries. (2) Conditions at most facilities would be expected to provide for safe juvenile fish passage. (3) Conditions at some facilities indicate that operation and/or maintenance should be modified to improve juvenile fish passage conditions. (4) Automated cleaning brushes generally functioned properly; chains and other moving parts were typically well greased and operative. (5) Removal of sediment buildup and accumulated leafy and woody debris could be improved at some sites.

  6. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 1993 Annual Report.

    SciTech Connect

    Unknown author

    1994-04-01

    The 1993 downstream migration of juvenile salmon experienced much better outmigration conditions than in recent years. Higher flows occurred in the spring, due to above-average spring precipitation and larger runoff volumes. Higher flows in the summer period resulted from implementation of Opinion flow targets. All indicators, passage indices, proportion of marks reaptured, and migration duration and pattern, indicate that fall chinook juveniles in particular benefitted from the passage conditions provided in 1993. Wild and hatchery spring chinook and steelhead responded to the conditions provided with faster travel times and a higher proportion reaching sample sites, when compared to past years, indicating improved survival. High uncontrolled runoff resulted in higher spill levels, benefitting fish passage, but also minor incidence of gas bubble trauma. Large scale problems were not observed. Very low returns of chinook jacks and one salt steelhead reflected the dismal outmigration conditions provided under the 1992 mitigation measures.

  7. Project LIFE Annual Report, September 1, 1972-August 31, 1973.

    ERIC Educational Resources Information Center

    Pfau, Glen S.

    Presented is the annual (contract year 1972-73) report of Project LIFE (Language Improvement to Facilitate Education), a program to develop an instructional system to assist handicapped preschool and elementary aged children to acquire a functional language system. The prime teaching modality of the program is explained to be the filmstrip which…

  8. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Annual listing of obligated projects. 450.332 Section 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332...

  9. Education North Evaluation Project. The First Annual Report.

    ERIC Educational Resources Information Center

    Ingram, E. J.; McIntosh, R. G.

    The first annual report and evaluation of Education North (a project designed to encourage parents, community members, and teachers in small, isolated, primarily Native and Metis communities in northern Alberta to work together to meet the educational needs of all community members) concentrates on the inner workings of the organizations (local…

  10. Annual Energy Outlook 2009 with Projections to 2030

    SciTech Connect

    2009-03-01

    The Annual Energy Outlook 2009 (AEO2009), prepared by the Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA’s National Energy Modeling System (NEMS). EIA published an “early release” version of the AEO2009 reference case in December 2008.

  11. Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

    SciTech Connect

    Patterson, Scott

    2009-04-10

    Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an

  12. Project Quinte annual report, 1993. Monitoring report No. 5. Annual publication

    SciTech Connect

    1995-12-31

    This report reviews the activities of Project Quinte, a long-term multi-agency research and monitoring project whose objectives include studying, comparing, and evaluating the Bay of Quinte limnological attributes (biological, physical, and chemical) before and after phosphorus control was implemented at municipal sewage treatment plans. The project also monitors long-term ecosystem responses within the Bay. The report includes papers summarizing research on such topics as phosphorus loadings, hydrology and sediment monitoring, nutrients and phytoplankton, toxic contaminant modeling, benthic fauna, fish populations, and wastewater toxicity.

  13. Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

    SciTech Connect

    Wick, Mike

    2008-12-30

    Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the

  14. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program, 2000 Annual Report.

    SciTech Connect

    Combs, Mitch

    2001-03-01

    The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operations and evaluations. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. These strategic changes have been the result of recommendations through the Lake Roosevelt Hatcheries Coordination Team (LRHCT) and were done to enhance imprinting, improve survival and operate the two kokanee facilities more effectively. The primary changes have been to replace the kokanee fingerling program with a yearling (post smolt) program of up to 1,000,000 fish. To construct and operate twenty net pens to handle the increased production. The second significant change was to rear 200,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Monitoring and evaluation is preformed by the Lake Roosevelt Fisheries Monitoring Program. From 1988 to 1998, the principle sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and kokanee and the economic value of the fishery has increased substantially during this 10-year period. The most recent information from the monitoring program also suggests that the hatchery and net pen rearing programs have been beneficial to enhancing the Lake Roosevelt fishery while not negatively impacting wild and native stocks within the lake.

  15. PFBC Utility Demonstration Project. Annual report, 1991

    SciTech Connect

    Not Available

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  16. Pinon Pine Power Project. Annual report, January--December 1994

    SciTech Connect

    1995-01-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project is a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies.

  17. Duck Valley Reservoirs Fish Stocking and O&M, Annual Progress Report 2007-2008.

    SciTech Connect

    Sellman, Jake; Perugini, Carol

    2009-02-20

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance Project (DV Fisheries) is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the federal hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View (MVR), Lake Billy Shaw (LBS), and Sheep Creek Reservoirs (SCR), the program is also designed to: maintain healthy aquatic conditions for fish growth and survival, provide superior facilities with wilderness qualities to attract non-Tribal angler use, and offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period fall into three categories: operations and maintenance, monitoring and evaluation, and public outreach. Operation and maintenance of the three reservoirs include maintaining fences, roads, dams and all reservoir structures, feeder canals, water troughs, stock ponds, educational signs, vehicles, equipment, and restroom facilities. Monitoring and evaluation activities include creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, and control of encroaching exotic vegetation. Public outreach activities include providing environmental education to school children, providing fishing reports to local newspapers and vendors, updating the website, hosting community environmental events, and fielding numerous phone calls from anglers. The reservoir monitoring program focuses on water quality and fishery success. Sheep Creek Reservoir and Lake Billy Shaw had less than productive trout growth due to water quality

  18. Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed, 2004-2005 Annual Report.

    SciTech Connect

    Rasmussen, Lynn

    2006-07-01

    The ''Restoring Anadromous Fish Habitat in the Big Canyon Creek Watershed'' is a multi-phase project to enhance steelhead trout in the Big Canyon Creek watershed by improving salmonid spawning and rearing habitat. Habitat is limited by extreme high runoff events, low summer flows, high water temperatures, poor instream cover, spawning gravel siltation, and sediment, nutrient and bacteria loading. Funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council's Fish and Wildlife Program, the project assists in mitigating damage to steelhead runs caused by the Columbia River hydroelectric dams. The project is sponsored by the Nez Perce Soil and Water Conservation District. Target fish species include steelhead trout (Oncorhynchus mykiss). Steelhead trout within the Snake River Basin were listed in 1997 as threatened under the Endangered Species Act. Accomplishments for the contract period September 1, 2004 through October 31, 2005 include; 2.7 riparian miles treated, 3.0 wetland acres treated, 5,263.3 upland acres treated, 106.5 riparian acres treated, 76,285 general public reached, 3,000 students reached, 40 teachers reached, 18 maintenance plans completed, temperature data collected at 6 sites, 8 landowner applications received and processed, 14 land inventories completed, 58 habitat improvement project designs completed, 5 newsletters published, 6 habitat plans completed, 34 projects installed, 2 educational workshops, 6 displays, 1 television segment, 2 public service announcements, a noxious weed GIS coverage, and completion of NEPA, ESA, and cultural resources requirements.

  19. Stocking of Offsite Waters for Hungry Horse Dam Mitigation; Creston National Fish Hatchery, 2001-2002 Annual Report.

    SciTech Connect

    Maskill, Mark

    2003-03-01

    Mitigation Objective 1: Produce Native Westslope Cutthroat Trout at Creston NFH--Task: Acquire eggs and rear up to 100,000 Westslope Cutthroat trout annually for offsite mitigation stocking. Accomplishments: A total of 150,000 westslope cutthroat eggs (M012 strain) were acquired from the State of Montana Washoe Park State Fish Hatchery in July 2001 for this objective. Another 120,000 westslope cutthroat eggs were taken from feral fish at Rogers Lake in May of 2001 by the Creston Hatchery crew. The fish were reared using approved fish culture techniques as defined in the U.S. Department of the Interior Fish Hatchery Management guidelines. Post release survival and angler success is monitored annually by Montana Fish Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations may vary yearly based on results of biological monitoring. Mitigation Objective 2: Produce Rainbow Trout at Creston NFH--Task: Acquire and rear up to 100,000 Rainbow trout annually for offsite mitigation in closed basin waters. Accomplishments: A total of 50,500 rainbow trout eggs (Arlee strain) were acquired from the State of Montana Arlee State Fish Hatchery in December 2001 for this objective. The fish were reared using approved fish culture techniques as defined in the U.S. Department of the Interior Fish Hatchery Management guidelines. Arlee rainbow trout are being used for this objective because the stocking locations are terminal basin reservoirs and habitat conditions and returns to creel are unsuitable for native cutthroat. Post release survival and angler success is monitored annually by the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations may vary yearly based on results of biological monitoring.

  20. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    SciTech Connect

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  1. Abundance, Behavior, and Habitat Utilization by Coho Salmon and Steelhead Trout in Fish Creek, Oregon, as Influenced by Habitat Enhancement, 1985 Annual Report.

    SciTech Connect

    Wolfe, John; Everest, Fred H.; Heller, David A.

    1986-09-01

    Construction and evaluation of salmonid habitat improvements on Fish Creek, a tributary of the upper Clackamas River, was continued in fiscal year 1985 by the Estacada Ranger District, Mt. Hood National Forest, and the Anadromous Fish Habitat Research Unit of the Pacific Northwest Forest and Range Experiment Station (PNW), USDA Forest Service. The study began in 1982 when PNW entered into an agreement with the Mt. Hood National Forest to evaluate fish habitat improvements in the Fish Creek basin on the Estacada Ranger District. The project was initially conceived as a 5-year effort (19824986) to be financed by Forest Service funds. Several factors limiting production of salmonids in the basin were identified during the first year of the study, and the scope of the habitat improvement effort was subsequently enlarged. The habitat improvement program and the evaluation of improvements were both expanded in mid-1983 when the Bonneville Power Administration entered into an agreement with the Mt. Hood National Forest to provide additional funding for work on Fish Creek. Habitat improvement work in the basin is designed to increase the annual number of chinook and coho salmon, and steelhead trout smolt outmigrants. The primary objectives of the evaluation include the: (1) Evaluation and quantification of changes in salmonid spawning and rearing habitat resulting from a variety of habitat Improvements. (2) Evaluation and quantification of changes in fish populations and biomass resulting from habitat improvements. (3) Evaluation of the cost-effectiveness of habitat improvements developed with BPA and Forest Service funds on Fish Creek. Several prototype enhancement projects were constructed and tested during the first three years of the study. The Intention was to identify successful techniques that could then be broadly applied within the bash. This stepwise procedure has been largely successful in identifying the most promising enhancement techniques for the Fish Creek

  2. Washington Department of Fish and Wildlife Fish Program Hatcheries Division: Ford Hatchery, Annual Report 2001-2002.

    SciTech Connect

    Lewis, Mike; Polacek, Matt; Knuttgen, Kamia

    2002-11-01

    The Washington Department of Fish and Wildlife implemented the Banks Lake Fishery Evaluation Project (BLFEP) in September 2001 with funds from the Bonneville Power Administration. The first year of the BLFEP was used to gather historic information, establish methods and protocols, collect limnology data, and conduct the first seasonal fish surveys. Water quality parameters were collected monthly from February to May and bi-monthly from June to August. Banks Lake water temperatures began to increase in April and stratification was apparent by June at all 3 limnology collection sites. By late August, the thermocline had dropped to nearly 20 m deep, with 19-20 C temperatures throughout the epilimnion. Dissolved oxygen levels were generally above 10 mg/L until mid summer when dissolved oxygen dropped near or below 5 mg/L below 20-m deep. Secchi depths ranged from 3-10 m and varied by location and date. Nearshore and offshore fish surveys were conducted in May and July using boat electrofishing, fyke net, gill net, and hydroacoustic surveys. Smallmouth bass Micropterous dolomieui (24%) and lake whitefish Coregonus clupeaformis (20%) dominated the nearshore species composition in May; however, by July yellow perch Perca flavescens (26%) were the second most common species to smallmouth bass (30%). Lake whitefish dominated the offshore catch during May (72%) and July (90%). The May hydroacoustic survey revealed highest densities of fish in the upper 1/3 of the water column in the mid- to northern sections of the reservoir near Steamboat Rock. In the future, data from seasonal surveys will be used to identify potential factors that may limit the production and harvest of kokanee, rainbow trout, and various spiny-rayed fishes in Banks Lake. The limiting factors that will be examined consist of: abiotic factors including water temperature, dissolved oxygen levels, habitat, exploitation and entrainment; and biotic factors including food limitation and predation. The BLFEP

  3. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1989.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1988-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501. the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1989. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3 of the Program. The Work Plan includes schedules with key milestones for FY 1989 and beyond, and is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded projects discussed in the FY 1989 Work Plan are listed in Tables 1 and 2 according to their current status. Table 1 (pp. 3-11) lists completed, ongoing, and deferred projects. Table 2 (pp. 12-13) lists all projects which BPA plans to fund as ''new'' projects in FY 1989. ''Ongoing'' status indicates that the project started in FY 1988 or before, and that it was still being implemented by BPA at the end of FY 1988. ''Deferred'' means that BPA implementation has been postponed to FY 1990 or later. ''Completed

  4. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.

    SciTech Connect

    Connor, Jason M.; McLellan, Jason G.; O'Connor, Dick

    2003-01-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan (1998

  5. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2002 Annual Report.

    SciTech Connect

    Connor, Jason M.; McLellan, Jason G.; Butler, Chris

    2003-09-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The

  6. John Day Watershed Restoration Projects, annual report 2003.

    SciTech Connect

    Brown, Linda

    2004-01-01

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional

  7. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.

    SciTech Connect

    Connor, Jason M.; McLellan, Jason G.; Butler, Chris

    2005-11-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The

  8. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.

    SciTech Connect

    Connor, Jason M.; McLellan, Jason G.; Butler, Chris

    2006-02-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The

  9. Hangman Restoration Project : Annual Report, August 1, 2001 - July 31, 2002.

    SciTech Connect

    Green, Gerald I.; Coeur D'Alene Tribe.

    2002-06-01

    activities are conducted in the headwaters of the system and are expected to prove beneficial to the natural functions of the entire Hangman Watershed. The following is the FY2001 annual report of Project activities and is submitted as partial fulfillment of Operation and Maintenance Task 2.a. The Objectives and Tasks for this first year were designed to position this Project for a long-term habitat restoration effort. As such, efforts were largely directed at information gathering and project orientation. The major task for this first year was development of a Habitat Prioritization Plan (attached) to guide implementation efforts by selecting areas that will be of greatest benefit to the native ecology. Completion of the first year tasks has positioned the project to move forward with implementing restoration activities using the latest information to accomplish the greatest possible results. The Project will be looking to implement on-the-ground protection and restoration efforts in the coming fiscal year using the data and information gathered in the last fiscal year. Continually refining our understanding of the natural watershed functions and fish and wildlife habitats within the Project Area will result in an increase in the efficiency of project implementation. Research and data gathering efforts will remain a strong emphasis in the coming fiscal year, as it will throughout the life of this Project.

  10. Fifteenmile Basin Habitat Enhancement Project: Annual Report FY 1988.

    SciTech Connect

    Smith, Roger C.; Marx, Steven D.

    1989-04-01

    The goal of the Fifteenmile Creek Habitat Enhancement Project is to improve wild winter steelhead in the Fifteenmile Creek Basin under the Columbia River Basin Fish and Wildlife Program. The project is funded by through the Bonneville Power Administration. Cooperators in the habitat enhancement project include the USDA Forest Service, Wasco County Soil and Water Conservation District and the Confederated Tribes of the Warms Springs. Installation of instream fish habitat structures was completed on four miles of Ramsey Creek and on one mile of Fifteenmile Creek. One hundred thirty-five structures were installed in treatment areas. Construction materials included logs and rock. Riparian protection fencing was completed on Dry Creek and Ramsey Creek worksites. Five and one-half miles of new fence was added to existing fence on Ramsey Creek to afford riparian protection to four miles of stream. Six miles of stream on Dry Creek will be afforded riparian protection by constructing 4.5 miles of fence to complement existing fence. 2 refs., 5 figs.

  11. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    SciTech Connect

    Sellman, Jake; Dykstra, Tim

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  12. Laboratory Class Project: Using a Cichlid Fish Display Tank to Teach Students about Complex Behavioral Systems

    PubMed Central

    Nolan, Brian C.

    2010-01-01

    Laboratory activities serve several important functions in undergraduate science education. For neuroscience majors, an important and sometimes underemphasized tool is the use of behavioral observations to help inform us about the consequences of changes that are occurring on a neuronal level. To help address this concern, the following laboratory exercise is presented. The current project tested the prediction that the most dominant fish in a tank of cichlids will have gained the most benefits of its position resulting in the greatest growth and hence, become the largest fish. More specifically: (1) is there evidence that a social hierarchy exists among the fish in our tank based on the number of aggressive acts among the four largest fish; (2) if so, does the apparent rank correspond to the size of the fish as predicted by previous studies? Focal sampling and behavior sampling of aggressive acts between fish were utilized in the data collection. Collectively, the data suggest a social dominance hierarchy may be in place with the following rank order from highest to lowest: Fish A > Fish B > Fish D > Fish C. While the largest (Fish A) seems to be at the top, Fish C ended up being ranked lower than Fish D despite the fact that Fish C is larger. Overall, the project was considered a success by the instructor and students. The students offered several suggestions that could improve future versions of this type of project, in particular concerning the process of constructing a poster about the project. The implications of the data and student learning outcomes are discussed. PMID:23493462

  13. Fifteenmile Creek Riparian Buffers Project, Annual Report 2002-2003.

    SciTech Connect

    Graves, Ron

    2004-02-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteenmile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. During this second year of the project, 11 buffer contracts were implemented on 10.9 miles of stream. Buffer widths averaged 132 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.6 years. The total value of contracts established this year is $666,121 compared with $71,115 in Bonneville Power Administration (BPA) contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. In addition, specific outreach efforts targeting the orchard areas of the county began to bear fruit with orchardists sign-ups as the project year ended. Progress this second year of project includes only work accomplished in the Fifteenmile subbasin. A similar but separate effort to implement buffers in the Columbia Plateau Province was initiated during the year under project number 2002-019-00. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion.

  14. Wasco Riparian Buffer Project, Annual Report 2003-2004.

    SciTech Connect

    Graves, Ron

    2003-07-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Deschutes River Sub-basin Summary, March 2, 2001. This project is providing the technical planning support needed to implement at least 20 riparian buffer system contracts on approximately 800 acres covering an estimated 36 miles of anadromous fish streams. During this second year of implementation, 17 buffer contracts were established on 173,462 ft. of stream (25.9 miles). Acreage included in the buffers totaled 891.6 acres. Average buffer width was 112 ft. on each side of the stream. Cumulative totals through the first two project years are 26 buffers on 36.6 stream miles covering 1,283.6 acres. Actual implementation costs, lease payments, and maintenance costs will be borne by existing USDA programs: Conservation Reserve (CRP) and Conservation Reserve Enhancement Programs (CREP). The lease period of each contract may vary from 10 to 15 years. During this year, the average lease period was 14.9 years. The total value of contracts established this year is $1,421,268 compared with $55,504 in BPA contract costs to provide the technical support needed to get the contracts implemented. Cumulative contract value for the first two years is $1,919,451 compared to $103,329 cost to BPA. This project provides technical staffing to conduct assessments and develop conservation plans required for riparian buffer systems to help keep pace with a growing backlog of potential buffer projects. This project meets a critical need in the lower Deschutes and lower John Day River basins and complements the Riparian Buffer project approved for Fifteenmile watershed, Project No. 2001-021-00 begun in fiscal year 2001. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion and benefits the mid-Columbia ESU of steelhead.

  15. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2000 Annual Report.

    SciTech Connect

    Crossley, Brian; Lockwood, Jr., Neil W.; McLellan, Jason G.

    2001-01-01

    The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project

  16. Oxbow Fish Hatchery Snake River Sockeye Salmon Smolt Program, 2008 Annual Report.

    SciTech Connect

    Banks, Duane D.

    2009-11-14

    This contract proposal is in response to the Federal Columbia River Power System Biological Opinion Implementation Plan/Update Proposed Action (UPA) associated with increasing the number of Snake River sockeye smolts by 150,000. To accomplish this proposal the cooperation and efforts of three government entities has been planned (e.g., Idaho Department of Fish and Game (IDFG), Oregon Department of Fish and Wildlife (ODFW), and the National Marine Fisheries Service (NMFS)). Improvements at the IDFG Eagle Fish Hatchery and NMFS Burley Creek Hatchery will focus on increasing sockeye salmon captive broodstock and egg production. Improvements at the ODFW Oxbow Fish Hatchery will be made to accommodate the incubation, hatching and rearing of 150,000 sockeye salmon smolts for release into Idaho's Sawtooth Valley, Upper Salmon River near IDFG's Sawtooth Fish Hatchery and/or Redfish Lake Creek 1.4 km downstream of Redfish Lake. Modifications to Oxbow Fish Hatchery (ODFW) will include retro-fit existing pond drains so pond cleaning effluent water can be routed to the pollution abatement pond, and modifications to the abatement pond. Also included in this project as an added phase, was the rerouting of the hatchery building effluent water to meet state DEQ guidelines for the use of formalin to treat salmonid eggs. Some additional funding for the described Oxbow Hatchery modifications will come from Mitchell Act Funding. All personnel costs associated with this project will come from Mitchell Act funding. Due to heavy work load issues, being under staffed, and two emergency projects in the spring and summer of 2006, ODFW engineers were not able to complete all plans and get them out for bid in 2006. As a result of these circumstances retro-fitting pond drains and modifications to the abatement pond was carried over into fiscal year 2007-2008. A no cost time extension to the contract was approved by BPA. The format for this report will follow the standard format for Statement

  17. Projecting Fish Mercury Levels in the Province of Ontario, Canada and the Implications for Fish and Human Health.

    PubMed

    Gandhi, Nilima; Bhavsar, Satyendra P; Tang, Rex W K; Arhonditsis, George B

    2015-12-15

    Fish mercury levels appear to be increasing in Ontario, Canada, which covers a wide geographical area and contains about 250 000 lakes including a share of the North American Great Lakes. Here we project 2050 mercury levels in Ontario fish, using the recently measured levels and rates of changes observed during the last 15 years, and present potential implications for fish and human health. Percentage of northern Ontario waterbodies where sublethal effects of mercury on fish can occur may increase by 2050 from 60% to >98% for Walleye (WE), 44% to 59-70% for Northern Pike (NP), and 70% to 76-92% for Lake Trout (LT). Ontario waterbodies with unrestricted fish consumption advisories for the general population may deteriorate from 24-76% to <1-33% for WE, 40-95% to 1-93% for NP, and 39-89% to 18-86% for LT. Similarly, Ontario waterbodies with do not eat advisories for the sensitive population may increase from 32-84% to 73-100% for WE, 9-72% to 12-100% for NP, and 19-71% to 24-89% for LT. Risk to health of Ontario fish and humans consuming these fish may increase substantially over the next few decades if the increasing mercury trend continues and updated advisories based on continued monitoring are not issued/followed. PMID:26592742

  18. Stocking of Offsite Waters for Hungry Horse Dam Mitigation; Creston National Fish Hatchery, 2002-2003 Annual Report.

    SciTech Connect

    US Fish and Wildlife Service Staff,

    2004-02-01

    Mitigation Objective 1: Produce Native Westslope Cutthroat Trout at Creston NFH--Task: Acquire eggs and rear up to 100,000 Westslope Cutthroat trout annually for offsite mitigation stocking. Accomplishments: A total of 141,000 westslope cutthroat eggs (M012 strain) was acquired from the State of Montana Washoe Park State Fish Hatchery in May 2002 for this objective. We also received an additional 22,000 westslope cutthroat eggs, MO12 strain naturalized, from feral fish at Rogers Lake, Flathead County, Montana. The fish were reared using approved fish culture techniques as defined in the U.S. Fish and Wildlife Service, Fish Hatchery Management guidelines. Survival from the swim up fry stage to stocking was 95.6%. We achieved a 0.80 feed conversion this year on a new diet, Skretting ''Nutra Plus''. Post release survival and angler success is monitored annually by Montana Fish Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations vary yearly based on results of biological monitoring and adaptive management. Mitigation Objective 2: Produce Rainbow Trout at Creston NFH--Task: Acquire and rear up to 100,000 Rainbow trout annually for offsite mitigation in closed basin waters. Accomplishments: A total of 54,000 rainbow trout eggs (Arlee strain) was acquired from the Ennis National Fish Hatchery in December 2002 for this objective. The fish were reared using approved fish culture techniques as defined in the U.S. Fish and Wildlife Service, Fish Hatchery Management guidelines. Survival from the swim up fry stage to stocking was 99.9%. We achieved a 0.79 feed conversion this year on a new diet, Skretting ''Nutra Plus''. Arlee rainbow trout are being used for this objective because the stocking locations are terminal basin reservoirs and habitat conditions and returns to the creel are unsuitable for native cutthroat. Post release survival and angler success is monitored annually by the Confederated Salish and Kootenai

  19. Moses Lake Fishery Restoration Project : FY 2000 Annual Report.

    SciTech Connect

    Burgess, Dave

    2003-02-01

    The Moses Lake Project (project No. 199502800) was first funded during FY 99 and field studies commenced October 2000. Later review of the proposal by the ISRP revealed perceived shortcomings. Immediately following the ISRP review Washington Department of Fish and Wildlife (WDFW) personnel were in contact with the Northwest Power Planning Council (NWPPC) regarding further options. The NWPPC allowed WDFW to re-submit the first proposal revision that was followed in June 2001 by a second negative review by the ISRP. In August 2001, the NWPPC authorized a third and final submission of the proposal and limited funding extension. Therefore, proposal revisions and resubmissions limited progress in data collection and analysis. This report covers work conducted within the submitted scope of work (FY 2000, September 27, 2000--September 26, 2001) and incorporation of the suggested modifications to the proposal. The bulk of the work covered by this report concentrated on data collection.

  20. Pend Oreille Wetlands Wildlife Mitigation Projects, 2001 Annual Report.

    SciTech Connect

    Entz, Ray D.

    2001-12-05

    The Pend Oreille Wetlands project consists of two adjacent parcels totaling about 600 acres. The parcels make up the northern boundary of the Kalispel Indian Reservation, and is also adjacent to the Pend Oreille River about 25 miles north of Newport and Albeni Falls Dam (Figure 1). Located in the Selkirk Mountains in Pend Oreille County Washington, the project is situated on an active floodplain, increasing its effectiveness as mitigation for Albeni Falls Dam. The combination of the River, wetlands and the north-south alignment of the valley have resulted in an important migratory waterfowl flyway. Washington Department of Fish and Wildlife and Kalispel Natural Resource Department have designated both project sites as priority habitats. Seven habitat types exist on the project properties and include four wetland habitats (open water, emergent, and scrub-shrub and forested), riparian deciduous forest, upland mixed coniferous forest and floodplain meadow. Importance of the project to wildlife is further documented by the occurrence of an active Bald Eagle nest aerie.

  1. Hellsgate Big Game Winter Range Wildlife Mitigation Project : Annual Report 2008.

    SciTech Connect

    Whitney, Richard P.; Berger, Matthew T.; Rushing, Samuel; Peone, Cory

    2009-01-01

    The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. At present, the Hellsgate Project protects and manages 57,418 acres (approximately 90 miles2) for the biological requirements of managed wildlife species; most are located on or near the Columbia River (Lake Rufus Woods and Lake Roosevelt) and surrounded by Tribal land. To date we have acquired about 34,597 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. In addition to the remaining 1,237 HUs left unmitigated, 600 HUs from the Washington Department of Fish and Wildlife that were traded to the Colville Tribes and 10 secure nesting islands are also yet to be mitigated. This annual report for 2008 describes the management activities of the Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) during the past year.

  2. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    SciTech Connect

    Contor, Craig R.; Harris, Robin; King, Marty

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  3. Annual Report on Wildlife Activities, September 1985 - April 1986, Action item 40.1, Columbia River Basin Fish and Wildlife Program.

    SciTech Connect

    United States. Bonneville Power Administration.

    1986-04-01

    This annual report addresses the status of wildlife projects Bonneville Power Administration (BPA) has implemented from September 1985 to April 1986 under the Columbia River Basin Fish and Wildlife Program (Program) established pursuant to the Northwest Power Act (P.L. 96-501). Wildlife projects implemented prior to September 1985 are discussed in BPA's September 1985 Annual Report on Wildlife Activities. This report provides a brief synopsis, review, and discussion of wildlife activities BPA has undertaken. When available, annual and final reports are listed for each project. The wildlife section of the Program establishes a process intended to achieve two objectives: wildlife protection, mitigation, and enhancement planning; and implementation of actions to protect, mitigate, and enhance wildlife affected by development and operation of hydroelectric facilities in the Columbia River Basin. The wildlife mitigation planning process developed by the Northwest Power Planning Council (Council) is a stepwise process that proceeds through the review of the status of wildlife mitigation at Columbia River Basin hydroelectric facilities [Measure 1004 (b)(l)]; estimates wildlife losses from hydroelectric development and operation [Measure 1004 (b)(2)]; and recommends actions for the protection, mitigation, or enhancement of wildlife [Measure 1004 (b)(3), Mitigation Plans]. Implementation of wildlife protection, mitigation, and enhancement will occur upon amendment of wildlife actions into the Program by the Council. The majority of BPA's effort to date has gone towards coordinating and implementing wildlife protection, mitigation, and enhancement planning projects.

  4. A Study to Determine the Biological Feasability of a New Fish Tagging System : Annual Report, 1986-1987.

    SciTech Connect

    Prentice, Earl F.; Flagg, T.A.

    1987-12-01

    In 1983, a multi-year project to evaluate the technical and biological feasibility of adapting a new identification system to salmonids was established. The system is based upon a miniaturized passive integrated transponder (PIT) tag. This report discusses the work completed and is divided into laboratory studies, field studies, and systems development. All studies were conducted using a glass-encapsulated tag implanted into the body cavity of test fish via a 12-gauge hypodermic needle. Laboratory studies with juvenile chinook salmon, Oncorhynchus tshawytscha, showed that retention of glass-encapsulated PIT tags was 99-100% in fish weighing 3 g (mean weight) or larger. No adverse tissue response to the tag was noted. The survival of fish 5 g (mean weight) or larger was usually greater than 99%. However, fish ranging in weight from 2 to 4 g, or fish undergoing a physiological change such as smoltification may have a low mortality (usually less than 5.0%) after tagging. The mortality rate in the smaller fish was dependent upon tagging skill whereas mortality in smolting fish seemed dependent upon the level of stress. Growth comparisons between tagged and control fish indicated PIT-tagged fish had a slightly depressed growth rate at some measurement periods. The operational life of glass-encapsulated PIT tags implanted in fish was good, with 100% of the tags operating after 401 days. No tags were rejected from the fish during the observation period.

  5. Pinon pine project. Annual report, January 1995--December 1995

    SciTech Connect

    1996-04-01

    This annual report has been prepared to present the status of the Pinon Pine Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the U.S. Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit will be designated as Tracy Unit No. 4. SPPCo, the project participant, has contracted with the Foster Wheeler USA Corporation (FW USA) for the overall project management, engineering, procurement and construction of the project. FW USA in turn has subcontracted with The M.W. Kellogg Company (MWK) for the engineering and procurement of key components for the Gasifier Island.

  6. Projected changes in the annual wind-wave cycle

    NASA Astrophysics Data System (ADS)

    Stopa, Justin; Hemer, Mark

    2016-04-01

    The uneven distribution of the sun's energy directly and indirectly drives physical atmosphere and ocean processes. This creates intricate spatial patterns within the seasonal cycle where higher order harmonics are seen to play an important role in regional climates. The annual cycle and associated harmonics are the strongest oscillations within the climate system and describe the majority of variance across the oceans. Consequently when studying climate oscillations, it is common practice to remove the seasonal cycle in order to elucidate inter-annual cycles. Furthermore the annual cycle plays an important role in the evolution of other inter-annual oscillations through non-linear coupling (e.g ENSO). Despite the important role of the seasons within the climate system very few studies describe the seasonality with any rigor. Therefore our focus is to describe the higher harmonics linked to the annual cycle and how they are expected to evolve in a changing climate. Using simulations from the Coordinated Ocean Wave Climate Project, the seasonality of multiple mid and end of the 21st century wind-wave climate projections are analyzed relative to historical experiment forced simulations. A comparison of various GCM forced wave simulations to reanalysis datasets reveals that a multi-model ensemble best describes the seasons. This ensemble is used to describe the changes within the wave seasonality. A systematic analysis reveals the primary mode of the seasons is relatively unchanged in the mid and end century. The largest changes occur in the second and third modes. The second mode defines the shift or translation within the seasons while the third mode characterizes relative change between the seasonal extremes (ie sharpening or flattening of the waveform). The relative changes in the second and third modes are not homogeneous and intricate patterns are revealed. Certain regions have sharper contrast in seasonality while other regions have a longer strong season. In

  7. Pinon Pine Power Project. Annual report, August 1992--December 1993

    SciTech Connect

    1994-11-01

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 104 MWe (gross) integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient and reliable and that are able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV.

  8. An Analysis of Potential Stream Fish and Fish Habitat Monitoring Procedures for the Inland Northwest: Annual Report 1999.

    SciTech Connect

    Peterson, James T.; Wollrab, Sherry P.

    1999-09-01

    Recent concerns over the rapid declines of native stream-fish populations in the inland Northwest have prompted the USDA Forest Service to institute interim land management practices intended to stop further declines in fish habitat quality and protect existing high quality habitat. Natural resource managers in the Inland Northwest need tools for assessing the success or failure of conservation policies and the impacts of management actions on fish and fish habitats. Effectiveness monitoring is one such potential tool, but there are currently no established monitoring protocols. Since 1991, US Forest Service biologists have used the standardized R1/R4 inventory procedures to measure fish and fish habitats on agency lands throughout the Intermountain West. The widespread use and acceptance of these standardized procedures and the large amount of data collected suggest that the R1/R4 procedures might provide the basis for an effectiveness monitoring protocol. Using fish and fish habitat data collected by Forest Service biologists, the authors assessed the efficiency of the R1/R4 procedures for monitoring stream fish and fish habitats.

  9. Tag-based estimates of annual fishing mortality of a mixed atlantic coastal stock of striped bass

    USGS Publications Warehouse

    Welsh, S.A.; Smith, D.R.; Laney, R.W.; Tipton, R.C.

    2007-01-01

    Tag-based estimates of annual survival and fishing mortality rates supplement annual stock assessments of migratory striped bass Morone saxatilis in the interjurisdictional fishery along the Atlantic coast. We estimated a 17-year time series of annual survival and fishing mortality (F) rates for striped bass (>711 mm) tagged during winter trawl studies (1988-2004) off the coasts of North Carolina and Virginia. The geographic and temporal distributions of tag recoveries were consistent with published patterns of striped bass migration and indicated that this southern overwintering aggregate of striped bass is composed of mixed stocks. Incremental increases in bias-adjusted annual fishing mortality rates (from 0.00-0.26) and decreases in the proportion of fish released alive (from 0.762-0.198) coincided with periods of regulatory change during the 17-year time frame. Our estimates of F fall below the current management triggers and should be considered along with other estimates of F within the striped bass management process.

  10. Environmental mitigation at hydroelectric projects. Volume 1, Current practices for instream flow needs, dissolved oxygen, and fish passage

    SciTech Connect

    Sale, M.J.; Cada, G.F.; Chang, L.H.; Christensen, S.W.; Railsback, S.F.; Francfort, J.E.; Rinehart, B.N.; Sommers, G.L.

    1991-12-01

    Current environmental mitigation practices at nonfederal hydropower projects were analyzed. Information about instream flows, dissolved oxygen (DO) mitigation, and upstream and downstream fish passage facilities was obtained from project operators, regulatory and resource agencies, and literature reviews. Information provided by the operators includes the specific mitigation requirements imposed on each project, specific objectives or purposes of mitigation, mitigation measures chosen to meet the requirement, the kinds of post-project monitoring conducted, and the costs of mitigation. Costs are examined for each of the four mitigation methods, segmented by capital, study, operations and maintenance, and annual reporting costs. Major findings of the study include: the dominant role of the Instream Flow Incremental Methodology, in conjunction with professional judgment by agency biologists, to set instream flow requirements; reliance on spill flows for DO enhancement; and the widespread use of angled bar racks for downstream fish protection. All of these measures can have high costs and, with few exceptions, there are few data available from nonfederal hydropower projects with which to judge their effectiveness. 100 refs.

  11. Columbia River: Terminal fisheries research project. 1994 Annual report

    SciTech Connect

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  12. Riparian Buffer Project : Annual Report for the Period April 1, 2001 to March 31, 2002.

    SciTech Connect

    Wasco County Soil and Water Conservation District

    2002-01-01

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteen mile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. In the first year of implementation, 26 buffer contracts were established on 25-26 miles of stream. This nearly doubled the annual goal. Buffer widths averaged 83 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.5 years. The total value of contracts established this year is $1,491,235 compared with $64,756 in BPA contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. More than half of the contracts this year have been done in the Hood and Fifteen mile sub-basins with additional contracts in adjacent sub-basins.

  13. Fifteenmile Basin Habitat Enhancement Project: Annual Report FY 1990.

    SciTech Connect

    Smith, Roger C.; Brown, Lawrence F.

    1990-03-31

    The goal of the Fifteenmile Creek Habitat Improvement project is to improve wild winter steelhead habitat in the Fifteenmile Creek Basin. This goal was addressed under the Columbia River Basin Fish and Wildlife Program, Measure 703 (c) (1) - Action Item 4.2. Construction of fish habitat structures was completed on approximately 3.5 miles of Eightmile Creek and on approximately 8.5 miles of Fifteenmile Creek. A total of 15,435 yds of rock was placed to improve rearing and spawning habitat, and to improve water quality and reduce siltation. Riparian protection fencing was completed on 1.8 miles of Dry Creek, approximately 1.75 miles on Eightmile Creek, and 4.75 miles on Fifteenmile Creek. Approximately 10 miles of stream will receive protection from the 8 miles of new fencing installed and 6.5 miles of abandoned fence repaired. Irrigation withdrawal screens were installed at six irrigation pump withdrawals. These screens functioned satisfactorily during the irrigation season. Physical and biological monitoring of stream flows, water temperature, and macro-invertebrate communities was conducted.

  14. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  15. Evaluation of Juvenile Fish Bypass and Adult Fish Facilities at Water Diversions in the Umatilla River; 1992 Annual Report.

    SciTech Connect

    Knapp, Suzanne M.

    1993-03-01

    We report on our progress from October 1991 through September 1992 in evaluating juvenile fish bypass facilities at Three Mile Falls and Westland dams on the Umatilla River. We also report on our progress from October 1991 through June 1992 in evaluating adult fish passage in the lower Umatilla River and adult fish passage facilities at Three Mile Falls Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). These are the study objectives addressed by ODFW and CTUIR: (1) Report A (ODFW): To evaluate the juvenile fish bypass facility in the West Extension Irrigation District Canal at Three Mile Falls Dam and document juvenile salmonid passage through the juvenile fish bypass facility and east-bank adult fish ladder. To measure velocity and develop trap designs at Westland Dam. (2) Report B (CTUIR): To examine the passage of adult salmonids at Three Mile Falls Dam. The study is part of a program to rehabilitate anadromous fish stocks in the Umatilla River Basin, including restoration of coho salmon (Oncorhynchus kisutch) and chinook salmon (Oncorhynchus tshawytscha), as well as enhancement of summer steelhead (Oncorhynchus mykiss).

  16. Operation Dominic, Shot Sword Fish. Project Officers report - project 1. 2 surface phenomena

    SciTech Connect

    Young, G.A.; Phillips, D.E.

    1985-04-01

    Shot Sword Fish was an operational test of the ASROC antisubmarine weapon system. The general objectives of the project were (1) to record and measure the formation, growth, and dissipation of the visible surface phenomena, including slicks, spray domes, plumes, fallout, base surge, and foam patch resulting from the underwater detonation of an ASROC weapon; (2) to use the data obtained to estimate the actual depth of burst, position of burst, yield, and bubble period; (3) to determine the location of ships and platforms in the experimental array before, during, and after the test; (4) to provide surface-phenomena time-of-arrival data at platforms and ships in the array for use by other projects; and 85) to make the results available for improving the surface-phenomena scaling and prediction techniques employed f,r establishing delivery and lethal ranges for fleet nuclear weapons. In general, there was good agreement between the observed dimensions of the Sword Fish phenomena and the predictions.

  17. Annual energy outlook 2006 with projections to 2030

    SciTech Connect

    2006-02-15

    The Annual Energy Outlook 2006 (AEO2006), prepared by the Energy Information Administration (EIA), presents long-term forecasts of energy supply, demand, and prices through 2030. The projections are based on results from EIA's National Energy Modeling System (NEMS). The report begins with an 'Overview' summarizing the AEO2006 reference case and comparing it with the AEO2005 reference case. The next section, 'Legislation and Regulations', discusses evolving legislation and regulatory issues, including recently enacted legislation and regulation, such as the Energy Policy Act of 2005, and some that are proposed. 'Issues in Focus' includes a discussion of the basis of EIA's substantial revision of the world oil price trend used in the projections. Other topics examined include: energy technologies on the cusp of being introduced; mercury emissions control technologies; and U.S. greenhouse gas intensity. 'Issues in Focus' is followed by 'Energy Market Trends', which provides a summary of the AEO2006 projections for energy markets. The analysis in AEO2006 focuses primarily on a reference case, lower and higher economic growth cases, and lower and higher energy price cases. In addition, more than 30 alternative cases are included in AEO2006. Complete tables for the five primary cases are provided in Appendixes A through C. Major results from many of the alternative cases are provided in Appendix D. Appendix E briefly describes NEMS and the alternatives cases. 112 figs., 25 tabs., 7 apps.

  18. Annual energy outlook 1999, with projections to 2020

    SciTech Connect

    1998-12-01

    The Annual Energy Outlook 1999 (AEO99) presents midterm forecasts of energy supply, demand, and prices through 2020 prepared by the Energy Information Administration (EIA). The projections are based on results from EIA`s National Energy Modeling System (NEMS). The report begins with an Overview summarizing the AEO99 reference case. The next section, Legislation and Regulations, describes the assumptions made with regard to laws that affect energy markets and discusses evolving legislative and regulatory issues. Issues in Focus discusses current energy issues--the economic decline in East Asia, growth in demand for natural gas, vehicle emissions standards, competitive electricity pricing, renewable portfolio standards, and carbon emissions. It is followed by the analysis of energy market trends. The analysis in AEO99 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present a summary of the reference case forecasts in units of oil equivalence and household energy expenditures. The AEO99 projections are based on Federal, State, and local laws and regulations in effect on July 1, 1998. Pending legislation and sections of existing legislation for which funds have not been appropriated are not reflected in the forecasts. Historical data used for the AEOI99 projections were the most current available as of July 31, 1998, when most 1997 data but only partial 1998 data were available.

  19. Umatilla River Fish Passage Operations Program, 2003-2004 Annual Report.

    SciTech Connect

    Bronson, James P.; Duke, Bill B.

    2005-08-01

    . The juvenile bypass ran at the 5 cfs level until the initiation of Phase I on August 15, 2004. The juvenile trap was operated by the Oregon Department of Fish and Wildlife (ODFW) under the Evaluation of Umatilla Juvenile Salmonid Outmigration Project.

  20. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    SciTech Connect

    Dena Tomchak

    2014-03-01

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program proves its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.

  1. Advanced Turbine Technology Applications Project (ATTAP). Annual report 1992

    SciTech Connect

    Not Available

    1993-03-01

    This report summarizes work performed by Garrett Auxiliary Power Division (GAPD), a unit of Allied-Signal Aerospace Company, during calendar year 1992, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the US Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATTAP). GAPD utilized the AGT101 regenerated gas turbine engine developed under the previous DOE/NASA Advanced Gas Turbine (AGT) program as the ATTAP test bed for ceramic engine technology demonstration. ATTAP focussed on improving AGT101 test bed reliability, development of ceramic design methodologies, and improvement of fabrication and materials processing technology by domestic US ceramics fabricators. A series of durability tests was conducted to verify technology advancements. This is the fifth in a series of technical summary reports published annually over the course of the five-year contract.

  2. Evaluation of Juvenile Fish Bypass and Adult Fish Passage Facilities at Water Diversions in the Umatilla River; 1993 Annual Report.

    SciTech Connect

    Knapp, Suzanne M.

    1994-03-01

    This report presents progress from October 1992 through September 1993 in evaluating juvenile fish bypass facilities at Three Mile Falls, Maxwell, Westland, and Feed Canal dams on the Umatilla River, and in evaluating adult fish passage in the lower Umatilla River. Also reported is an effort to evaluate delayed mortality and stress responses of juvenile salmonids resulting from trapping and transport at high temperatures. These studies are part of a program to rehabilitate anadromous fish stocks in the matilla River Basin, including restoration of coho salmon and chinook salmon, as well as enhancement of summer steelhead.

  3. Enloe Dam Passage Project, Volume I, 1984 Annual Report.

    SciTech Connect

    Fanning, M.L.

    1985-07-01

    This report discusses issues related to the provision of fish passage facilities at Enloe Dam and the introduction of anadromous salmonid fish to the upper Similkameen River basin. The species of fish being considered is a summer run of steelhead trout adapted to the upper Columbia basin. (ACR)

  4. Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

    SciTech Connect

    Soults, Scott

    2009-08-05

    The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

  5. Large Differences in Aging Phenotype between Strains of the Short-Lived Annual Fish Nothobranchius furzeri

    PubMed Central

    Benedetti, Mauro; Roncaglia, Paola; Cattaneo, Antonino; Domenici, Luciano; Cellerino, Alessandro

    2008-01-01

    Background A laboratory inbred strain of the annual fish Nothobranchius furzeri shows exceptionally short life expectancy and accelerated expression of age markers. In this study, we analyze new wild-derived lines of this short-lived species. Methodology/Principal Findings We characterized captive survival and age-related traits in F1 and F2 offspring of wild-caught N. furzeri. Wild-derived N. furzeri lines showed expression of lipofuscin and neurodegeneration at age 21 weeks. Median lifespan in the laboratory varied from to 20 to 23 weeks and maximum lifespan from 25 to 32 weeks. These data demonstrate that rapid age-dependent decline and short lifespan are natural characteristics of this species. The N. furzeri distribution range overlaps with gradients in altitude and aridity. Fish from more arid habitats are expected to experience a shorter survival window in the wild. We tested whether captive lines stemming from semi-arid and sub-humid habitats differ in longevity and expression of age-related traits. We detected a clear difference in age-dependent cognitive decline and a slight difference in lifespan (16% for median, 15% for maximum lifespan) between these lines. Finally, we observed shorter lifespan and accelerated expression of age-related markers in the inbred laboratory strain compared to these wild-derived lines. Conclusions/Significance Owing to large differences in aging phenotypes in different lines, N. furzeri could represent a model system for studying the genetic control of life-history traits in natural populations. PMID:19052641

  6. Lake Roosevelt Fisheries Evaluation Program, Part C; Lake Roosevelt Pelagic Fish Study: Washington Department of Fish and Wildlife, 1998 Annual Report.

    SciTech Connect

    Baldwin, Casey; Polacek, Matt; Bonar, Scott

    2002-11-01

    Pelagic fishes, such as kokanee and rainbow trout, provide an important fishery in Lake Roosevelt; however, spawner returns and creel results have been below management goals in recent years. Our objective was to identify factors that potentially limit pelagic fish production in Lake Roosevelt including entrainment, food limitation, piscivory, and other abiotic factors. We estimated the ratio of total fish entrained through Grand Coulee Dam to the pelagic fish abundance for September and October, 1998. If the majority of these fish were pelagic species, then entrainment averaged 10-13% of pelagic fish abundance each month. This rate of entrainment could impose considerable losses to pelagic fish populations on an annual basis. Therefore, estimates of species composition of entrained fish will be important in upcoming years to estimate the proportion of stocked pelagic fish lost through the dam. Food was not limiting for kokanee or rainbow trout populations since growth rates were high and large zooplankton were present in the reservoir. Estimates of survival for kokanee were low (< 0.01 annual) and unknown for rainbow trout. We estimated that the 1997 standing stock biomass of large (>1.1 mm) Daphnia could have supported 0.08 annual survival by kokanee and rainbow trout before fish consumption would have exceeded available biomass during late winter and early spring. Therefore, if recruitment goals are met in the future there may be a bottleneck in food supply for pelagic planktivores. Walleye and northern pikeminnow were the primary piscivores of salmonids in 1996 and 1997. Predation on salmonid prey was rare for rainbow trout and not detected for burbot or smallmouth bass. Northern pikeminnow had the greatest individual potential as a salmonid predator due to their high consumptive demand; however, their overall impact was limited because of their low relative abundance. We modeled the predation impact of 273,524 walleye in 1996, and 39,075 northern pikeminnow in

  7. Columbia Basin Water Transactions Program (Water Entity); National Fish and Wildlife Foundation, Annual Report 2003.

    SciTech Connect

    National Fish and Wildlife Foundation

    2004-02-01

    Launched in 2002, the Columbia Basin Water Transactions Program (CBWTP) is anticipated to be a five-year effort to test new strategies for enhancing tributary flows. The premise of the CBWTP is that water can most readily be made available for instream flows not by attempting to regulate senior water users but, instead, by acquiring water rights from willing sellers and transferring those rights to instream flows within the prior appropriation framework ('first in time, first in right'). The primary goals for this water initiative included: (1) To implement Action 151 of the NOAA Fisheries 2000 Biological Opinion on the Operation of the Federal Columbia River Power System. (2) To implement Provision A.8 of the Council's 2000 Columbia River Basin Fish and Wildlife Program related to securing water for instream flows. (3) To integrate components of the Northwest Power and Conservation Council's Program and Watershed Assessment process with the NOAA Fisheries 2000 Biological Opinion. (4) To ensure actions taken under the program would be effective, fiscally efficient, and biologically beneficial to fish and wildlife in the region. In the spring of 2002, BPA and a group of water experts selected ten local entities in Washington, Oregon, Idaho, and western Montana with a demonstrated potential to innovate and implement tributary flow improvements. We also selected the National Fish and Wildlife Foundation (NFWF) to serve as the regional entity for this initiative. BPA then set up the funding agreement and scope of work to establish what is now known as the Columbia Basin Water Transactions Program. In FY 2003, BPA provided over $1.5 million in funding to the CBWTP and approved 33 water transactions. In FY 2004, BPA will provide up to $4 million to the project to enhance habitat. Thanks to the dedicated efforts of partners throughout the Basin, the CBWTP is off to a strong start in improving tributary flows in key areas across the region.

  8. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    SciTech Connect

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L.; Cada, G.F.; Jones, D.W.; Dauble, D.D.; Hunt, R.T.; Costello, R.J.

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  9. Annual Energy Outlook 2013 with Projections to 2040

    SciTech Connect

    2013-04-01

    The Annual Energy Outlook 2013 (AEO2013), prepared by the U.S. Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2040, based on results from EIA’s National Energy Modeling System. The report begins with an “Executive summary” that highlights key aspects of the projections. It is followed by a “Legislation and regulations” section that discusses evolving legislative and regulatory issues, including a summary of recently enacted legislation and regulations, such as: Updated handling of the U.S. Environmental Protection Agency’s (EPA) National Emissions Standards for Hazardous Air Pollutants for industrial boilers and process heaters; New light-duty vehicle (LDV) greenhouse gas (GHG) and corporate average fuel economy (CAFE) standards for model years 2017 to 2025; Reinstatement of the Clean Air Interstate Rule (CAIR) after the court’s announcement of intent to vacate the Cross-State Air Pollution Rule (CSAPR); and Modeling of California’s Assembly Bill 32, the Global Warming Solutions Act (AB 32), which allows for representation of a cap-and-trade program developed as part of California’s GHG reduction goals for 2020. The “Issues in focus” section contains discussions of selected energy topics, including a discussion of the results in two cases that adopt different assumptions about the future course of existing policies, with one case assuming the elimination of sunset provisions in existing policies and the other case assuming the elimination of the sunset provisions and the extension of a selected group of existing public policies—CAFE standards, appliance standards, and production tax credits. Other discussions include: oil price and production trends in AEO2013; U.S. reliance on imported liquids under a range of cases; competition between coal and natural gas in electric power generation; high and low nuclear scenarios through 2040; and the impact of growth in natural gas

  10. Radioactive contamination of fish, shellfish, and waterfowl exposed to Hanford effluents: Annual summaries, 1945--1972

    SciTech Connect

    Hanf, R.W.; Dirkes, R.L.; Duncan, J.P.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction Project (HEDR) is to estimate the potential radiation doses received by people living within the sphere of influence of the Hanford Site. A potential critical pathway for human radiation exposure is through the consumption of waterfowl that frequent onsite waste-water ponds or through eating of fish, shellfish, and waterfowl that reside in/on the Columbia River and its tributaries downstream of the reactors. This document summarizes information on fish, shellfish, and waterfowl radiation contamination for samples collected by Hanford monitoring personnel and offsite agencies for the period 1945 to 1972. Specific information includes the types of organisms sampled, the kinds of tissues and organs analyzed, the sampling locations, and the radionuclides reported. Some tissue concentrations are also included. We anticipate that these yearly summaries will be helpful to individuals and organizations interested in evaluating aquatic pathway information for locations impacted by Hanford operations and will be useful for planning the direction of future HEDR studies.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  12. Annual energy outlook 2009 with projections to 2030

    SciTech Connect

    2009-03-15

    The Annual Energy Outlook 2009 (AEO009), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA's National Energy Modeling System (NEMS). EIA published an 'early release' version of the AEO009 reference case in December 2008. The report begins with an 'Executive Summary' that highlights key aspects of the projections. It is followed by a 'Legislation and Regulations' section that discusses evolving legislation and regulatory issues, including a summary of recently enacted legislation, such as the Energy Improvement and Extension Act of 2008 (EIEA2008). The next section, 'Issues in Focus,' contains discussions of selected topics, including: the impacts of limitations on access to oil and natural gas resources on the Federal Outer Continental Shelf (OCS); the implications of uncertainty about capital costs for new electricity generating plants; and the result of extending the Federal renewable production tax credit (PTC). It also discusses the relationship between natural gas and oil prices and the basis of the world oil price and production trends in AEO2009.

  13. Annual energy outlook 1998 with projections to 2020

    SciTech Connect

    1997-12-01

    The Annual Energy Outlook 1998 (AEO98) is the first AEO with projections to 2020. Key issues for the forecast extension are trends in energy efficiency improvements, the effects of increasing production and productivity improvements on energy prices, and the reduction in nuclear generating capacity. Projections in AEO98 also reflect a greater shift to electricity market restructuring. Restructuring is addressed through several changes that are assumed to occur in the industry, including a shorter capital recovery period for capacity expansion decisions and a revised financial structure that features a higher cost of capital as the result of higher competitive risk. Both assumptions tend to favor less capital-intensive generation technologies, such as natural gas, over coal or baseload renewable technologies. The forecasts include specific restructuring plans in those regions that have announced plans. California, New York, and New England are assumed to begin competitive pricing in 1998. The provisions of the California legislation for stranded cost recovery and price caps are incorporated. In New York and New England, stranded cost recovery is assumed to be phased out by 2008.

  14. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    SciTech Connect

    Cada, G.F.

    1996-10-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy`s Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality.

  15. A Directed Research Project Investigating Aggressive Behavior in Paradise Fish.

    ERIC Educational Resources Information Center

    Darling, Ruth A.

    2003-01-01

    Presents a laboratory experiment that examines the aggressive behavior of male paradise fish. Students design the experiment, collect data, and analyze and interpret the results. This activity is appropriate for biology, ecology, and animal behavior classes and allows students to be involved in the entire scientific process. (Author/NB)

  16. Rapid growth, early maturation and short generation time in African annual fishes

    PubMed Central

    2013-01-01

    Background Extreme environmental conditions can give rise to extreme adaptations. We document growth, sexual maturation and fecundity in two species of African annual fish inhabiting temporary savanna pools. Results Nothobranchius kadleci started to reproduce at the age of 17 days and size of 31 mm and Nothobranchius furzeri at 18 days and 32 mm. All four study populations demonstrated rapid growth rates of up to 2.72 mm/day (23.4% of their total length). Both species may produce diapausing embryos or embryos that are able to hatch in as few as 15 days, resulting in a minimum generation time as short as only one month. Incubation on the surface of damp peat moss results in high embryo survival (73%) and a high proportion of rapidly developing embryos (58%) that skip diapauses and hatch in less than 30 days. We further demonstrated that rapid growth and maturation do not compromise subsequent fecundity. Conclusions Our data suggest that both species have the most rapid sexual maturation and minimum generation time of any vertebrate species, and that rapid maturity does not involve paedogenesis. PMID:24007640

  17. Umatilla River Fish Passage Operations Program, 2001-2002 Annual Report.

    SciTech Connect

    Zimmerman, Brian C.; Duke, Bill B.

    2003-02-01

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, Oregon is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 22, 2001 to September 12, 2002. A total of 5,519 summer steelhead (Oncorhynchus mykiss); 1,146 adult, 1,158 jack, and 970 subjack fall chinook (O. tshawytscha); 22,792 adult and 80 jack coho (O. kisutch); and 5,058 adult and 188 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 261 adult and 14 jack spring chinook were hauled upstream from Threemile Dam for release. There were 5,359 summer steelhead; 622 adult, 1,041 jack and 867 subjack fall chinook; 22,513 adult and 76 jack coho; and 4,061 adult and 123 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. In addition, 110 summer steelhead; 462 adult and 24 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 141 days between February 22 and July 12, 2002. During that period, fish were bypassed back to the river 134 days and were trapped 5 days. An estimated 200 pounds of juvenile fish were transported from Westland. Approximately 90% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened August 16, 2002. The bypass was run until October 31, 2001 with the exception of the period from August 29 to September 16. The bypass was reopened March 7, 2002 and ran until July 8. The juvenile trap was operated from July 8 to July 12 by the Umatilla Passage Evaluation project.

  18. Umatilla River Fish Passage Operations Program, 2002-2003 Annual Report.

    SciTech Connect

    Bronson, James P.; Duke, Bill B.

    2004-03-01

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 17, 2002 to September 29, 2003. A total of 3,080 summer steelhead (Oncorhynchus mykiss); 1716 adult, 617 jack, and 1,709 subjack fall chinook (O. tshawytscha); 3,820 adult and 971 jack coho (O. kisutch); and 3,607 adult and 135 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 6 summer steelhead and 330 adult and 49 jack spring chinook were hauled upstream from Threemile Dam. There were 2,882 summer steelhead; 1161 adult, 509 jack and 1,546 subjack fall chinook; 3,704 adult and 915 jack coho; and 2,406 adult and 31 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 109 summer steelhead; 532 adult and 32 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. In addition, 282 spring chinook were collected for the outplanting efforts in the Walla Walla Basin. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 159 days between January 27 and July 4, 2003. During that period, fish were bypassed back to the river 145 days and were trapped 11 days. An estimated 205 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 82% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened on September 16, 2002. and continued until November 1, 2002. The bypass was reopened March 3, 2003 and ran until July 3, 2003. The juvenile trap was operated by the Umatilla Passage Evaluation

  19. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    SciTech Connect

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  20. USDA area-wide project for annual grasses: outcomes and impacts

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This document provides a record of the research, outreach, education and technology transfer that was completed as part of the area-wide project for invasive annual grasses from 2007-2012. The overall goal of the project was to catalyze a holistic integrated management program for invasive annual g...

  1. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits... (OEP) computes and publishes the project cost and annual limits for natural gas pipelines blanket..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy...

  2. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Energy Regulatory Commission 18 CFR Part 157 Natural Gas Pipelines; Project Cost and Annual Limits AGENCY... publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for... CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  3. Area Fish and Game Ecology [Sahuarita High School Career Curriculum Project.

    ERIC Educational Resources Information Center

    Esser, Robert

    This course entitled "Area Fish and Game Ecology" is one of a series of instructional guides prepared by teachers for the Sahuarita High School (Arizona) Career Curriculum Project. It consists of nine units of study, and 18 behavioral objectives relating to these units are stated. The topics covered include map projections, map symbols and…

  4. Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed; Anadromous Fish Habitat Restoration in the Nichols Canyon Subwatershed, 2000 Annual Report.

    SciTech Connect

    Koziol, Deb

    2001-02-01

    Nez Perce Soil & Water Conservation District (NPSWCD) undertook the Nichols Canyon Subwatershed Steelhead Trout Habitat Improvement Project in the spring of 1999 with funding from a grant through the Bonneville Power Administration. The Project's purpose is to install and implement agricultural best management practices (MBPS) and riparian restorations with the goal of improving steelhead trout spawning and rearing habitat in the subwatershed. Improvements to fish habitat in the Big Canyon Creek tributaries enhances natural production of the species in Big Canyon Creek and ultimately the Clearwater River. This report is a summation of the progress made by the NPSWCD in the Project's second year.

  5. SkateBase, an elasmobranch genome project and collection of molecular resources for chondrichthyan fishes

    PubMed Central

    Wyffels, Jennifer; L. King, Benjamin; Vincent, James; Chen, Chuming; Wu, Cathy H.; Polson, Shawn W.

    2014-01-01

    Chondrichthyan fishes are a diverse class of gnathostomes that provide a valuable perspective on fundamental characteristics shared by all jawed and limbed vertebrates. Studies of phylogeny, species diversity, population structure, conservation, and physiology are accelerated by genomic, transcriptomic and protein sequence data. These data are widely available for many sarcopterygii (coelacanth, lungfish and tetrapods) and actinoptergii (ray-finned fish including teleosts) taxa, but limited for chondrichthyan fishes.  In this study, we summarize available data for chondrichthyes and describe resources for one of the largest projects to characterize one of these fish, Leucoraja erinacea, the little skate.  SkateBase ( http://skatebase.org) serves as the skate genome project portal linking data, research tools, and teaching resources. PMID:25309735

  6. SkateBase, an elasmobranch genome project and collection of molecular resources for chondrichthyan fishes.

    PubMed

    Wyffels, Jennifer; King, Benjamin L; Vincent, James; Chen, Chuming; Wu, Cathy H; Polson, Shawn W

    2014-01-01

    Chondrichthyan fishes are a diverse class of gnathostomes that provide a valuable perspective on fundamental characteristics shared by all jawed and limbed vertebrates. Studies of phylogeny, species diversity, population structure, conservation, and physiology are accelerated by genomic, transcriptomic and protein sequence data. These data are widely available for many sarcopterygii (coelacanth, lungfish and tetrapods) and actinoptergii (ray-finned fish including teleosts) taxa, but limited for chondrichthyan fishes.  In this study, we summarize available data for chondrichthyes and describe resources for one of the largest projects to characterize one of these fish, Leucoraja erinacea, the little skate.  SkateBase ( http://skatebase.org) serves as the skate genome project portal linking data, research tools, and teaching resources. PMID:25309735

  7. Annual energy outlook 1994: With projections to 2010

    SciTech Connect

    Not Available

    1994-01-01

    The Annual Energy Outlook 1994 (AEO94) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projects and analyses of energy supply, demand, and prices through 2010, based for the first time on results from the National Energy Modeling System (NEMS). NEMS is the latest in a series of computer-based energy modeling systems used over the past 2 decades by EIA and its predecessor organization, the Federal Energy Administration, to analyze and forecast energy consumption and supply in the midterm period (about 20 years). Quarterly forecasts of energy supply and demand for 1994 and 1995 are published in the Short-Term Energy Outlook (February 1994). Forecast tables for 2000, 2005, and 2010 for each of the five scenarios examined in the AEO94 are provided in Appendices A through E. The five scenarios include a reference case and four additional cases that assume higher and lower economic growth and higher and lower world oil prices. Appendix F provides detailed comparisons of the AEO94 forecasts with those of other organizations. Appendix G briefly described the NEMS and the major AEO94 forecast assumptions. Appendix H summarizes the key results for the five scenarios.

  8. Annual energy outlook 1997 with projections to 2015

    SciTech Connect

    1996-12-01

    The Annual Energy Outlook 1997 (AEO97) presents midterm forecasts of energy supply, demand, and prices through 2015 prepared by the Energy Information Administration (EIA). These projections are based on results of EIA`s National Energy Modeling System (NEMS). This report begins with a summary of the reference case, followed by a discussion of the legislative assumptions and evolving legislative and regulatory issues. ``Issues in Focus`` discusses emerging energy issues and other topics of particular interest. It is followed by the analysis of energy market trends. The analysis in AEO97 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present summaries of the reference case forecasts in units of oil equivalence and household energy expenditures. Twenty-three other cases explore the impacts of varying key assumptions in NEMS--generally, technology penetration, with the major results shown in Appendix F. Appendix G briefly describes NEMS and the major AEO97 assumptions, with a summary table. 114 figs., 22 tabs.

  9. Annual energy outlook 1995, with projections to 2010

    SciTech Connect

    1995-01-01

    The Annual Energy Outlook 1995 (AEO95) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projections and analyses of energy supply, demand, and prices through 2010, based on results from the National Energy Modeling System (NEMS). Quarterly forecasts of energy supply and demand for 1995 and 1996 are published in the Short-Term Energy Outlook (February 1995). Forecast tables for the five cases examined in the AEO95 are provided in Appendixes A through C. Appendix A gives historical data and forecasts for selected years from 1992 through 2010 for the reference case. Appendix B presents two additional cases, which assume higher and lower economic growth than the reference case. Appendix C presents two cases that assume higher and lower world oil prices. Appendix D presents a summary of the forecasts in units of oil equivalence. Appendix E presents a summary of household energy expenditures. Appendix F provides detailed comparisons of the AEO95 forecasts with those of other organizations. Appendix G briefly describes NEMS and the major AEO95 forecast assumptions. Appendix H presents a stand-alone high electricity demand case. Appendix 1 provides a table of energy conversion factors and a table of metric conversion factors. 89 figs., 23 tabs.

  10. Basalt Waste Isolation Project. Annual report, fiscal year 1980

    SciTech Connect

    Not Available

    1980-11-01

    During this fiscal year the information available in the fields of geology and hydrology of the Columbia Plateau was consolidated and two reports were issued summarizing this information. In addition, the information on engineered barriers was consolidated and a report summarizing the research to date on waste package development and design of borehole seals was prepared. The waste package studies, when combined with the hydrologic integration, revealed that even under extreme disruptive conditions, a repository in basalt with appropriately designed waste packages can serve as an excellent barrier for containment of radionuclides for the long periods of time required for waste isolation. On July 1, 1980, the first two heater tests at the Near-Surface Test Facility were started and have been successfully operated to this date. The papers on the Near-Surface Test Facility section of this report present the results of the equipment installed and the preliminary results of the testing. In October 1979, the US Department of Energy selected the joint venture of Kaiser Engineers/Parsons Brinckerhoff Quade and Douglas, Inc., to be the architect-engineer to produce a conceptual design of a repository in basalt. During the year, this design has progressed and concept selection has now been completed. This annual report presents a summary of the highlights of the work completed during fiscal year 1980. It is intended to supplement and summarize the nearly 200 papers and reports that have been distributed to date as a part of the Basalt Waste Isolation Project studies.

  11. Annual energy outlook 2005 with projections to 2025

    SciTech Connect

    2005-02-01

    The Annual Energy Outlook 2005 (AEO2005) presents midterm forecasts of energy supply, demand, and prices through 2025 prepared by the Energy Information Administration (EIA). The projections are based on results from EIA's National Energy Modelling System (NEMS). The report begins with an 'Overview' summarizing the AEO2005 reference case. The next section, 'Legislation and Regulations', discusses evolving legislative and regulatory issues in the USA. Issues in Focus includes discussions on key energy market issues and examines their potential impacts. In particular, it includes a discussion of the world oil price assumptions used in the reference case and four alternative world oil price cases examined in AEO2005. 'Issues in Focus' is followed by 'Market Trends', which provides a summary of energy market trends in the AEO2005 forecast. The analysis in AEO2005 focuses primarily on a reference case, lower and higher economic growth cases, and four alternative oil price cases, a low world oil price case, an October oil futures case, and two high world oil price cases. Forecast tables for those cases are provided in Appendixes A through D. The major results for the alterative cases, which explore the impacts of varying key assumption in NEMS (such as rates of technology penetration), are summarized in Appendix E. Appendix F briefly describes NEMS and the alternative cases. 115 figs., 38 tabs., 8 apps.

  12. Annual Energy Outlook 2011 with Projections to 2035

    SciTech Connect

    2011-04-01

    The projections in the Energy Information Administration's (EIA) Annual Energy Outlook 2011 (AEO2011) focus on the factors that shape the U.S. energy system over the long term. Under the assumption that current laws and regulations remain unchanged throughout the projections, the AEO2011 Reference case provides the basis for examination and discussion of energy production, consumption, technology, and market trends and the direction they may take in the future. It also serves as a starting point for analysis of potential changes in energy policies. But AEO2011 is not limited to the Reference case. It also includes 57 sensitivity cases (see Appendix E, Table E1), which explore important areas of uncertainty for markets, technologies, and policies in the U.S. energy economy. Key results highlighted in AEO2011 include strong growth in shale gas production, growing use of natural gas and renewables in electric power generation, declining reliance on imported liquid fuels, and projected slow growth in energy-related carbon dioxide (CO2) emissions even in the absence of new policies designed to mitigate greenhouse gas (GHG) emissions. AEO2011 also includes in-depth discussions on topics of special interest that may affect the energy outlook. They include: impacts of the continuing renewal and updating of Federal and State laws and regulations; discussion of world oil supply and price trends shaped by changes in demand from countries outside the Organization for Economic Cooperation and Development or in supply available from the Organization of the Petroleum Exporting Countries; an examination of the potential impacts of proposed revisions to Corporate Average Fuel Economy standards for light-duty vehicles and proposed new standards for heavy-duty vehicles; the impact of a series of updates to appliance standard alone or in combination with revised building codes; the potential impact on natural gas and crude oil production of an expanded offshore resource base

  13. Women's independent access to productive resources: fish ponds in the Oxbow Lakes Project, Bangladesh.

    PubMed

    Nathan, D; Apu, N A

    1998-01-01

    This article analyzes the experiences of women in acquiring user rights to fish ponds on government owned lands in the Oxbow Lakes Project in Bangladesh. The analysis describes the significance, functioning, and problems of women in fish farming. The field reports were based on the authors' involvement in implementation of the extension of fishing rights to women during 6 weeks/year over 4 years. Analysis was based on observations and discussions during project implementation and on a survey conducted in March 1997. The project involved land reforms that transferred rights to a group of poor people. Most of the lakes had been overfished. The poor fishers were organized into Lake Fishing Teams (LFTs) with the right to culture and harvest fish in lakes that were under common property management. In late 1994, at least 50% of the women were included in the Fish Farming Groups (FFGs) to manage fish culture in ponds constructed in shallow areas of the lake shore. The proportion of women was increased to 75% in 1994-95 and favored women-headed households. By March 1997, there were 510 members of FFGs, of whom 84% were single, poor women. Women had low participation in fish sales and netting and guarding the harvest. Women in mixed gender groups complained that men dominated the key decision-making and financial areas. Production averaged 1500 kg/hectare in 1995-96. FFGs had higher expenses for feed and fertilizer than LFTs. This endeavor earned higher per capita income than poultry raising. All women groups performed better than mixed groups. These groups increased assertiveness and self-confidence. PMID:12179931

  14. Evaluation of Juvenile Fish Bypass and Adult Fish Passage Facilities at Water Diversions on the Umatilla River; 1994 Annual Report.

    SciTech Connect

    Knapp, Suzanne M.

    1995-01-01

    We report on our progress from October 1993 through September 1994 in evaluating juvenile salmonid bypass facilities and juvenile salmonid passage through ladder facilities, and investigating passage conditions for juvenile fish at diversion dam facilities on the lower Umatilla River in northeastern Oregon. We also report on our progress in evaluating adult salmonid passage at and between dams on the lower Umatilla River and upriver migration using radio telemetry. Two principal studies are also included. Report A (ODFW): To evaluate the juvenile salmonid bypass facilities a Feed and Furnish canals, juvenile salmonid passage through fish ladders at Stanfield, Feed Canal, Westland, and Three Mile Falls dams, and the juvenile salmonid trap and haul procedures at Westland Canal. To investigate passage conditions at all passage facilities. Report B (CTUIR): To examine the passage of adult salmonids past diversions in the lower Umatilla River and their movement in the upper river after transport, using radio telemetry, and to assess factors for successful homing. These studies are part of a program to rehabilitate anadromous fish stocks in the Umatilla River Basin, including restoration of coho salmon (Oncorhynchus kisutch) and chinook salmon (Oncorhynchus tshawytscha), as well as enhancement of summer steelhead (Oncorhynchus mykiss).

  15. Annual and Spatial Variation of the Kelp Forest Fish Assemblage at San Nicolas Island, California

    USGS Publications Warehouse

    Cowen, R.J.; Bodkin, J.L.

    1993-01-01

    The kelp forest fishes of San Nicolas Island, California were studied from 1981-1986 to examine the causes of among-site and among-year variation in the fish assemblages. Fish counts and seven physical and biological variables were recorded at six sites around the island every spring and fall. Over the study period, a total of 45 fish species from 18 families were recorded, though members of nive families dominated at all sites. Among-site variation was considereable with two sites on the south side of the island having two to four times as many non-schooling fishes as the other four sites. Three variables, based on stepwise multiple regression techniques, were important predictors of site-specific fish abundance: 1) vertical relief; 2) sand cover and 3) understory algal cover. The total number of fishes varied interannually by a factor of three. Due to recruitment occuring each spring, there was a strong seasonal component to the variation in fish abundance. The extent of seasonal and interannual variaton of fish abundance is an indication of the variable nature of recruitment to this area. Over the 6 yr period, there were three distinct groupings of fish assemblages correspondong to pre- (Fall 1981 - Fall 1982), during spring (Spring 1983 - Spring 1984) and post El Nino (Fall 1984 - Fall 1986) sampling dates. During El Nino sampling period, there was considerable recruitment of southern affinity fish species, increasing both the abundance and diversity of the fish assemblages. Large-scale oceanographic processes, coupled with site-specific features of the reef habitat, produce a moderately diverse, though relatively abundant fish fauna at San Nicolas Island.

  16. Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects for 1990/1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation.

  17. Ferrocyanide safety project ferrocyanide aging studies FY 1995 annual report

    SciTech Connect

    Lilga, M.A.; Alderson, E.V.; Hallen, R.T.

    1995-09-01

    This annual report gives the results of the work conducted by the Pacific Northwest Laboratory in FY 1995 on Task 3 of the Ferrocyanide Safety Project, Ferrocyanide Aging Studies. Aging refers to the dissolution and hydrolysis of simulated Hanford ferrocyanide waste in alkaline aqueous solutions by radiolytic and chemical means. The ferrocyanide simulant primarily used in these studies was dried In-Farm-1B, Rev. 7, prepared by Westinghouse Hanford Company to simulate the waste generated when the In-Farm flowsheet was used to remove radiocesium from waste supernates in single-shell tanks at the Hanford Site. In the In-Farm flowsheet, nickel ion and ferrocyanide anion were added to waste supernates to precipitate sodium nickel ferrocyanide, Na{sub 2}NiFe(CN){sub 6}, and co-precipitate radiocesium. Once the radiocesium was removed, supernates were pumped from the tanks, and new wastes from cladding removal processes or from evaporators were added. These new wastes were typically highly caustic, having hydroxide ion concentrations of over 1 M and as high as 4 M. The Aging Studies task is investigating reactions this caustic waste may have had with the precipitated ferrocyanide waste in a radiation field. In previous Aging Studies research, Na{sub 2}NiFe(CN){sub 6} in simulants was shown to dissolve in basic solutions, forming insoluble Ni(OH){sub 2} and soluble Na{sub 4}Fe(CN){sub 6}. The influence on solubility of base strength, sodium ion concentration, anions, and temperature was previously investigated. The results may indicate that even ferrocyanide sludge that did not come into direct contact with highly basic wastes may also have aged significantly.

  18. Episodic acidification and associated fish and aquatic invertebrate responses in four Catskill Mountain streams: An interim report of the Episodic Response Project. Open File Report

    SciTech Connect

    Murdoch, P.S.; Bonitz, C.E.; Eakin, K.W.; Ranalli, A.J.; Witt, E.C.

    1991-07-01

    The Episodic Response Project is a multidisciplinary research project designed to assess the role of storm and snowmelt runoff in stream acidification and the associated responses of fish and invertebrates. Four streams in the Catskill region of eastern New York were selected to represent the following conditions: (1) high acid-neutralizing capacity (ANC) with no acidic episodes annually, (2) high ANC with few acidic episodes, (3) moderate to low ANC with few acidic episodes, and (4) low ANC with frequent acidic episodes. Results of the first 9 months of research in the Catskill region indicate that storm and snowmelt runoff are associated with short periods of stream acidification that, if sufficiently severe, lead to fish mortality or migration away from acidic reaches. Increased discharge coincided with decreased pH and increased total aluminum concentrations in all four streams.

  19. A molecular phylogeny for aplocheiloid fishes (Atherinomorpha, Cyprinodontiformes): the role of vicariance and the origins of annualism.

    PubMed

    Murphy, W J; Collier, G E

    1997-08-01

    Annual aplocheiloid killifish embryos possess a rare ability among vertebrates to enter stages of developmental arrest (diapause) when subjected to adverse environmental conditions. Previous morphological analyses have presented disparate hypotheses regarding the evolution of the intriguing life history associated with this phenomenon. We present a novel hypothesis of aplocheiloid relationships based on 1,009 bp of sequence data from three mitochondrial genes (cytochrome b, 12S rRNA, and 16S rRNA). Phylogenetic analysis using maximum parsimony, neighbor-joining, and maximum likelihood produce strongly congruent topologies. Our data confirm the monophyly of the Neotropical family Rivulidae, while demonstrating a paraphyletic Old World assemblage. The basal sister group position of Indo-Malaysian and Madagascaran taxa relative to a monophyletic South American/African dichotomy strongly indicates the role of vicariance in the diversification of these fishes in spite of their definition as secondary freshwater fish. The distribution of annualism onto this topology implies a single early origin for this suite of characters, prior to the divergence of South American and African taxa. If so, then annualism has since been lost several times during the evolution of genera now residing in permanent aquatic habitats. Paleoclimatic knowledge complements this scenario based on molecular characters. PMID:9254916

  20. A report upon the Grand Coulee Fish Maintenance Project 1939-1947

    USGS Publications Warehouse

    Fisher, Frederick S.; Hanavan, Mitchell G.

    1948-01-01

    The Grand Coulee Fish-Maintenance Project, undertaken by the United States Fish and Wildlife Service in 19.391 consisted in relocating the anadroumous runs of the upper Columbia River to four major tributaries entering below the Grand Coulee damsite. These streams were believed capable of supporting several times their existing, badly depleted, run. The plan was predicated upon the assumption that the relocated runs, in conformity with their "homing tendency", would return to the lower tributaries rather than attempt to reach their ancestral spawning grounds above Grand Coulee Dam. This interim report covers the history and accanplishments of the Grand Coulee Fish-Maintenance Project through the initial period of relocating the rune as well as the first four years of the permanent program. Results obtained to date indicate conclusive success in diverting the upper Columbia fish runs into the accessible lower tributaries. The results also indicate, less conclusively, that-in spite of many existing handicaps--the upper Columbia salmon and steelhead runs may be rehabilitated through the integrated program of natural and artificial propagation incorporated in the Grand Coulee Fish-Maintenance Project.

  1. Readings in Wildlife and Fish Conservation, High School Conservation Curriculum Project.

    ERIC Educational Resources Information Center

    Ensminger, Jack

    This publication is a tentative edition of readings on Wildlife and Fish Conservation in Louisiana, and as such it forms part of one of the four units of study designed for an experimental high school course, the "High School Conservation Curriculum Project." The other three units are concerned with Forest Conervation, Soil and Water Conservation,…

  2. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    SciTech Connect

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  3. A Study to Determine the Biological Feasibility of a New Fish Tagging System : Annual Report 1984.

    SciTech Connect

    Prentice, Earl F.; Sims, C.W.; Park, D.L.

    1985-05-01

    The potential of the Passive Integrated Transponder (PIT) tag for marking salmonids was evaluated. In Phase I, sham PIT tags were injected into the body cavity of juvenile salmonids. Tagged fish ranged in weight from 0.8 to 43.9 g. Observations based on six tests, ranging in time from 19 to 99 days, indicated that the test site for injecting the tag was along the mid-ventral line in the area of the pectoral or pelvic fins. Tag retention of 99% (n = 400) and survival of 99% were achieved. Minimal tissue response to the tag was noted in both tag locations. In Phase II, a PIT tag detector system designed to detect and record the passage of juvenile salmonids was evaluated. By restricting the rate at which fish entered the monitoring tunnel to one fish per second, detection averaged 94.3% compared to 86.6% for multiple fish entry. In Phase III, a monitoring system designed to detect and decode adult fish tagged with a PIT tag was evaluated. The average detection and proper decoding of these tagged fish was 94.4% for 211 fish. Improvements in the detection system are recommended.

  4. A Fisheries Evaluation of the Richland and Wapato Canal Fish Screening Facilities, Spring 1987 : Annual Report.

    SciTech Connect

    Neitzel, Duane A.; Abernethy, C.Scott; Lusty, E.William; Wampler, Sally J.

    1988-02-01

    We evaluated the effectiveness of new fish screening facilities at the Richland and Wapato canals in south-central Washington State. The screen integrity tests at the Richland Screens indicated that 100% of fall chinook salmon fry (Oncorhynchus tshawytscha) released in front of the screens were prevented from entering the canal behind the screens. Our estimate is based on a 61% catch efficiency for control fish planted behind the screens. At the Wapato Canal, we estimated that between 3% and 4% of the test fish were either impinged on the screen surface and passed over the screens or passed through faulty screen seals. Our estimate is based over the screens or passed through faulty screen seals. Our estimate is based on a greater than 90% capture of control fish released in front of the screens. At the Wapato Screens, we estimated that 0.8% of steelhead smolts (Salmo gairdneri) and 1.4% of spring chinook salmon smolts released during low canal flow tests wee descaled. During full canal flow tests, 1.6% of the steelhead and 3.1% of the spring chinook salmon released were descaled. The fish return pipe at the Wapato Canal was tested: the estimate of descaled test fish wa not different from the estimate of descaled control fish. The time required for fish to exit from the Wapato Screen forebay varied with species and with canal flow. During low canal flows, 43.2% of steelhead and 61.6% of spring chinook salmon smolts released at the trash racks were captured in the fish return within 96 hr. 11 refs., 11 figs., 10 tabs.

  5. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    SciTech Connect

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008

  6. Washington Phase II Fish Diversion Screen Evaluations in the Yakima River Basin, 2004-2005 Annual Report.

    SciTech Connect

    Vucelick, Jessica; McMichael, Geoffrey; Chamness, Mickie

    2006-02-01

    In 2004, the Pacific Northwest National Laboratory (PNNL) evaluated 25 Phase II fish screen sites in the Yakima River Basin as part of a multi-year project for the Bonneville Power Administration on the effectiveness of fish screening devices. PNNL collected data to determine whether velocities in front of the screens and in the bypasses met the National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries, formerly the National Marine Fisheries Service (NMFS)) criteria to promote safe and timely fish passage. In addition, PNNL conducted underwater video surveys to evaluate the environmental and operational conditions of the screen sites with respect to fish passage. Based on evaluations in 2004, PNNL concluded that: (1) In general, water velocity conditions at the screen sites met fish passage criteria set by NOAA Fisheries. (2) Conditions at most facilities would be expected to provide for safe juvenile fish passage. (3) Automated cleaning brushes generally functioned properly; chains and other moving parts were typically well-greased and operative. (4) Removal of sediment buildup and accumulated leafy and woody debris could be improved at some sites. (5) Conditions at some facilities indicate that operation and/or maintenance should be modified to improve passage conditions for juvenile fish. For example, Taylor has had problems meeting bypass flow and submergence operating criteria since the main river channel shifted away from the site 2 years ago, and Fruitvale consistently has had problems meeting bypass flow criteria when the water is low. (6) Continued problems at Gleed point to design flaws. This site should be considered for redesign or replacement.

  7. Augmented Fish Health Monitoring; Volume I of II, Completion Report.

    SciTech Connect

    Michak, Patty

    1991-05-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Historically, all agencies involved with fish health in the Columbia Basin were conducting various levels of fish health monitoring, pathogen screening and collection. The goals of this project were; to identify, develop and implement a standardized level of fish health methodologies, develop a common data collection and reporting format in the area of artificial production, evaluate and monitor water quality, improve communications between agencies and provide annual evaluation of fish health information for production of healthier smolts. This completion report will contain a project evaluation, review of the goals of the project, evaluation of the specific fish health analyses, an overview of highlights of the project and concluding remarks. 8 refs., 1 fig., 4 tabs.

  8. Comprehensive cooling water study annual report. Volume VII: fish communities, Savannah River Plant

    SciTech Connect

    Gladden, J.B.; Lower, M.W.; Mackey, H.E.; Specht, W.L.; Wilde, E.W.

    1985-07-01

    Adult fishes representing a total of 66 species were collected at transects in the Savannah River, intake canals, and the mouths of Upper Three Runs Creek, Steel Creek, Four Mile Creek, Beaver Dam Creek, and Lower Three Runs Creek. Densities and seasonal trends of adult fish in the mouths of the ambient temperature creeks were similar to those in the river, with very low densities in January and higher densities in the other months. In contrast, relative density in thermally influenced Four Mile Creek peaked during January at levels greater than the other transects, indicating a wintertime aggregation of fishes in its heated waters which were up to 7/sup 0/C warmer than ambient temperatures. Fish avoided Four Mile Creek during May, August, and October when excessively high water temperatures occurred. Ichthyoplankton densities were highest downstream of the SRP during February, March, and April, highest near the SRP during May, and highest upstream of the SRP during June and July. Studies of nonthermal, thermal, and post-thermal areas in SRP stream and swamp systems indicate that the thermal streams have markedly reduced species richness and abundance relative to ambient temperature areas. An average of 37 fish were impinged daily on the SRP pumphouse intake screens. Entrainment of larval fish and eggs at the SRP pumphouses during the 1983 spawning season totaled 37.2 x 10/sup 6/ ichthyoplankters which was 9.3% of the ichthyoplankton that passed by the intake canals and structures. 69 refs., 33 figs., 61 tabs.

  9. Projecting future changes in distributions of pelagic fish species of Northeast Pacific shelf seas

    NASA Astrophysics Data System (ADS)

    Cheung, William W. L.; Brodeur, Richard D.; Okey, Thomas A.; Pauly, Daniel

    2015-01-01

    Marine life is being affected by changes in ocean conditions resulting from changes in climate and chemistry triggered by combustion of fossil fuels. Shifting spatial distributions of fish species is a major observed and predicted impact of these oceanographic changes, and such shifts may modify fish community structure considerably in particular locations and regions. We projected future range shifts of pelagic marine fishes of the Northeast Pacific shelf seas by 2050 relative to the present. We combined published data, expert knowledge, and pelagic fish survey data to predict current species distribution ranges of 28 fish species of the Northeast Pacific shelf seas that occur in the epipelagic zone and are well-represented in pelagic fish surveys. These represent a wide spectrum of sub-tropical to sub-polar species, with a wide range of life history characteristics. Using projected ocean condition changes from three different Earth System Models, we simulated changes in the spatial distribution of each species. We show that Northeast Pacific shelf seas may undergo considerable changes in the structure of its pelagic marine communities by mid-21st century. Ensembles of model projections suggest that the distribution centroids of the studied species are expected to shift poleward at an average rate of 30.1 ± 2.34 (S.E.) km decade-1 under the SRES A2 scenario from 2000 to 2050. The projected species range shifts result in a high rate of range expansion of this group of species into the Gulf of Alaska and the Bering Sea. Rate of range contraction of these species is highest at the Aleutian Islands, and in the California Current Large Marine Ecosystem. We also predict increasing dominance of warmer water species in all regions. The projected changes in species assemblages may have large ecological and socio-economic implications through mismatches of co-evolved species, unexpected trophic effects, and shifts of fishing grounds. These results provide hypotheses of

  10. Natural Propagation and Habitat Improvement, Volume 1, Oregon, Supplement B, White River Falls Fish Passage, 1983 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1984-04-01

    White River Falls are located in north central Oregon approximately 25 miles south of the City of The Dalles. The project site is characterized by a series of three natural waterfalls with a combined fall of 180 ft. In the watershed above the falls are some 120 miles of mainstem habitat and an undetermined amount of tributary stream habitat that could be opened to anadromous fish, if passage is provided around the falls. The purpose of this project is to determine feasibility of passage, select a passage scheme, and design and construct passage facilities. This report provides information on possible facilities that would pass adult anadromous fish over the White River Falls. 25 references, 29 figures, 12 tables. (ACR)

  11. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  12. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  13. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  14. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual... and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were.... (c) The listing shall be published or otherwise made available in accordance with the MPO's...

  15. Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects, 1989/1990.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 6-7, 1990, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. The following pages list the projects by title, the project leaders and BPA's project officers, and an abstract of each leaders presentation. These summaries are in some cases preliminary; they are subject to change and should not be quoted without consulting the project leader.

  16. A Study to Determine the Biological Feasibility of a New Fish Tagging System: Annual Report, 1985-1986.

    SciTech Connect

    Prentice, Earl F.; Park, D.L.; Flagg, T.A.; McCutcheon, S.

    1986-12-01

    An ongoing cooperative project between the Bonneville Power Administration and the National Marine Fisheries Service was initiated in 1983 to evaluate the technical and biological feasibility of adapting a new identification system to salmonids. The system is based upon the passive integrated transponder (PIT) tag. This report discusses the work completed in 1985 and is divided into laboratory and field studies. All studies were conducted with the tag implanted into the body cavity of the test fish via a 12-gauge hypodermic needle.

  17. Development of a more fish-tolerant turbine runner, advanced hydropower turbine project

    SciTech Connect

    Cook, T.C.; Hecker, G.E.; Faulkner, H.B.; Jansen, W.

    1997-02-01

    Alden Research Laboratory, Inc. (ARL) and Northern Research and Engineering Corporation (NREC) conducted a research program to develop a turbine runner which will minimize fish injury and mortality at hydroelectric projects. ARL?NREC have developed a runner shape which minimizes the number of blade leading edges, reduces the pressure versus time and the velocity versus distance gradients within the runner, minimizes or eliminates the clearance between the runner and runner housing, and maximizes the size of the flow passages, all with minimal penalty on turbine efficiency. An existing pump impeller provided the starting point for developing the fish tolerant turbine runner. The Hidrostal pump is a single bladed combined screw/centrifugal pump which has been proven to transport fish with minimal injury. The focus of the ARL/NREC research project was to develop a new runner geometry which is effective in downstream fish passage and hydroelectric power generation. A flow of 1,000 cfs and a head in the range of 75 ft to 100 ft were selected for conceptual design of the new runner. Conceptual design of the new runner began with a re-evaluation of studies which have been previously conducted to identify probable sources of injury to fish passing through hydraulic turbines. Criteria relative to hydraulic characteristics which are favorable for fish passage were prepared based on a reassessment of the available information. Important criteria used to develop the new runner design included low pressure change rates, minimum absolute pressures, and minimum shear. Other criteria which are reflected in the runner design are a minimum number of blades (only two), minimum total length of leading edges, and large flow passages. 86 figs., 5 tabs.

  18. A Fisheries Evaluation of the Dryden Fish Screening Facility : Annual Report 1994.

    SciTech Connect

    Mueller, Robert P.; Abernethy, C.Scott; Neitzel, Duane A.

    1995-04-01

    Effectivness was evaluated of the Dryden Fish Screening Facility in the Wenatchee Reclamation District Canal near Dryden in north central Washington State. In situ tests were conducted by releasing groups of hatchery reared salmonids of different ages and sizes. Spring chinook salmon smolts (110-165 mm) were not injured or descaled in passing through the canal forebay. Smolts were not delayed as they migrated in the canal. Most fish released at the canal headworks exited the screening facility in <4 h, with >99% of the test fish captured in the fish bypass in <24 h. Steelhead subyearlings 65-125 mm were not injured or descaled in traveling through the bypass flume and fish return pipe. Average time for steelhead subyearlings to travel through thebypass structure was 70 seconds. Small rainbow trout fry 23-27mm could pass through the 0.125-in. profile bar screen openings and were entrained in the irrigation canal; about 38% was lost to the canal within 48 h of release. Some fry stayed in the forebay and did not migrate during the tests. Wild chinook fry 36-42mm were also entrained. Estimated 34% of emergent wild chinook salmon fry passed through the profile bar screens and were entrained in the canal. Approach velocity at the Dryden screens was {ge}0.4 ft/s; low velocities through the first two screen panels indicated that vertical louvers installed behind each screen panel to balance flow were not totally effective.

  19. Project Directors' Annual Meeting (4th, Washington, D.C., December 1-2, 1988).

    ERIC Educational Resources Information Center

    Chadsey-Rusch, Janis

    The document contains materials relating to the annual meeting of the project directors working with the Secondary Transition Intervention Effectiveness Institute, held December 1-2, 1988. The document includes an agenda, summaries of 10 featured project presentations, summaries of 32 poster sessions, a list of meeting participants, and a…

  20. NREL Solar Radiation Resource Assessment Project: Status and outlook. Annual progress report, FY 1992

    SciTech Connect

    Renne, D.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.; Riordan, C.; Hammond, E.; Ismailidis, T.

    1993-06-01

    This annual report summaries the activities and accomplishments of the Solar Radiation Resource Assessment Project during fiscal year 1992 (1 October to 30 September 1992). Managed by the Analytic Studies Division of the National Renewable Energy Laboratory, this project is the major activity of the US Department of Energy`s Resource Assessment Program.

  1. Interagency Child Abuse Network Project. Annual Report: Innovations in Protective Services.

    ERIC Educational Resources Information Center

    Dennis-Small, Lucretia

    This annual report describes the Interagency Child Abuse Network (ICAN) Project, a joint venture of the Texas Department of Human Services and the Alamo Area Council of Governments in Bexar County. The goal of the ICAN Project was to establish a network of agencies in the county that could develop a team approach to handling child abuse cases. The…

  2. Asotin Creek Model Watershed 1997 Habitat Projects, 1997-1998 Annual Progress Report.

    SciTech Connect

    Johnson, B.J.

    1998-12-01

    The installation of fish and wildlife restoration projects on Asotin Creek completed in 1997 include: 11 in-stream habitat restoration projects, 3 reparian exclusion fences, 6 riparian fences, 14 sediment basin constructions, 54 sediment basin cleanouts, 1 multi-purpose pond construction, 1800 ft of terraces, and 1 three month water quality study. In-stream project objectives were to increase the number of large pools with complex fish habitat containing LWD, re-establish the steambank stability, and reduce in-stream temperatures. Most of the projects listed above were cost-share on private land with the landowners paying 50%-10% of the project costs and signing a ten-year maintenance agreement.

  3. Washington Phase II Fish Diversion Screen Evaluations in the Yakima River Basin, 1997 Annual Report.

    SciTech Connect

    Blanton, S.; Neitzel, C.; Abernethy, C.

    1998-02-01

    The Pacific Northwest National Laboratory evaluated 19 Phase II screen sites in the Yakima River Basin at least three times each between April 30 and August 22, 1997. The sites were examined to determine if they were being effectively operated and maintained to provide fish a safe, efficient return to the river. Data were collected to determine if velocities in front of the screens and in the bypass met current NMFS criteria and promoted timely fish bypass, if fish were protected from injury due to impingement, entrainment, and predation, and whether bypass outfall conditions allowed fish to safely return to the river. A bi-directional flow meter and underwater video system were essential in completing the investigation. In general, water velocity conditions at the screen sites were acceptable by NMFS standards. High approach velocities and slow bypass flow were the most common problems noted. Although velocities often fluctuated from one sampling location to the next, average sweep and approach velocities were very good. In general, fish should not be impinged or experience delays in returning to the river under normal operating conditions. Most screens were properly sealed to prevent fish entrainment and injury, although potential problems were identified at several screen sites. Three sites had gap openings from the forebay to the aftbay, allowing fish to be entrained. Other sites had spaces larger than 3/32 inch where small fish could become trapped. Some drum screens had flat spots but these were not been confirmed as underwater gaps, primarily because of siltation. On rare occasions, seals were intact, but cracked or turned under. Submergence levels at the drum screen sites exceeded 85% for one third of our evaluations. Eight of 12 drum screen sites experienced high water levels during at least one evaluation. Only one operating site's submergence was measured at less than 65% submergence. Two flat plate screen sites were completely overtopped with water

  4. Employment Projections and Program Priorities. AIR 1999 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Rosenthal, Dan; Collier, Kitty

    This study compared occupational projections for Alabama with graduation rates in corresponding academic programs to provide a context for state and institutional policy decisions on new program initiatives and to comply with recent program viability legislation. The study examined number of degrees conferred, employment projections, and…

  5. NREL Energy Storage Projects: FY2013 Annual Report

    SciTech Connect

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  6. Project CREATES. First Annual Report 1968-69.

    ERIC Educational Resources Information Center

    Stolurow, Lawrence M.; Klare, George R.

    Project CREATES stands for Combined Resources for Editing Automated Teaching to Enlighten Students, the Harvard University Computer-Aided Instruction Laboratory's part of "A Multi-Agency Developmental Adult Basic Education Program." The major emphases of Project CREATES have been in the area of program and procedure development for computer-aided…

  7. SPEEDIER Project. Third Annual Report, 1969-70.

    ERIC Educational Resources Information Center

    Curriculum Study Research and Development Council of South Central Pennsylvania, Palmyra.

    This project was funded under ESEA Title III and four subcontracts with Research for Better Schools. The Title III aspect of the project focused on curriculum change in the fields of language arts, social sciences, and teacher training. Complete reports on each of the following have been included: 1) the Social Studies Pilot Programs as described…

  8. Secretary's annual report to Congress. Volume III. Project summaries

    SciTech Connect

    1981-01-01

    Progress and status of representative projects in each program within DOE are summarized. Subjects covered and the number of projects reported on are: conservation (2); fossil energy (11); nuclear energy (5); renewable energy resources (16); energy production and power marketing (3); general science (11); defense programs (7); contingency planning (3); and management and oversight (1). (MCW)

  9. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    SciTech Connect

    Not Available

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  10. Advanced Gas Turbine (AGT) Technology Development Project annual report

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This report is the tenth in a series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Carborundum Company, and AiResearch Casting Company. The Project is administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report covers plans and progress for the period July 1, 1984 through June 30, 1985.

  11. Pataha [Creek] Model Watershed : 1997 Habitat Projects : Annual Progress Report.

    SciTech Connect

    Bartels, Duane

    1998-10-28

    The projects outlined in detail on the attached project reports are a few of the many projects implemented in the Pataha Creek Model Watershed since it was selected as a model in 1993. Up until this year, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and was the main focus of the implementation phase of the watershed plan. These practices are the main focus of the watershed plan to reduce the majority of the sediment entering the stream.

  12. Communicating the Issue of Underwater Noise Pollution: The Deaf as a Fish Project.

    PubMed

    Sebastianutto, Linda; Stocker, Michael; Picciulin, Marta

    2016-01-01

    Aquatic noise pollution is largely ignored by the lay public. How experts communicate this issue is critical to move public opinion. In 2010, the Cassa di Risparmio di Gorizia (CaRiGO) bank sponsored the Deaf as a Fish project that included local underwater noise monitoring, a boat census, a pamphlet for nonexperts, and some seminars and public meetings. This project allowed us to raise interest in this issue. Using accurate and understandable language in a light-humored setting goes far toward cultivating trust from a public audience that can be intimidated or suspicious of complicated scientific messaging. PMID:26611060

  13. Magma energy research project, FY80 annual progress report

    NASA Astrophysics Data System (ADS)

    Colp, J. L.

    1982-04-01

    The technical feasibility of extracting energy from magma bodies is explored. Five aspects of the project are studied: resource location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction.

  14. UAS Integration in the NAS Project - FY 14 Annual Review

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Randall, Debra; Hackenberg, Davis

    2014-01-01

    This briefing gives insight into the research activities and efforts being executed in order to integrate unmanned aircraft systems into the national airspace system. This briefing is to inform others of the UAS-NAS Projects progress and future directions.

  15. Nez Perce Tribal Hatchery Project, 1999 Annual Report.

    SciTech Connect

    Johnson, David B.; Larson, Roy Edward; Walker, Grant W.

    2001-08-17

    This report consists of activities/events conducted in response to the Objectives and Tasks described in the 1999 contract Statement Of Work for the Planning and Planning and Design (P and D) and Maintenance (O and M) activities of the Nez Perce Tribal Hatchery (NPTH). The report follows the format of the contract for ease in finding accomplishments. Although specific emphasis will be placed on activities related directly to the NPTH, activities from other artificial production related projects might also be noted because of overlap in staff duties and production facilities. Additionally, the project leader's role has evolved as other Tribal fisheries projects have been developed and assigned to the Production Division, Department of Fisheries Resource Management (DFRM), and Nez Perce Tribe (NPT). Thus, implementation of the project leader role for the NPTH actually entails specific duties of the Production Division Director and the Production Division Coordinator, as well as the Hatchery Division Coordinator.

  16. Magma Energy Research Project, FY80 annual progress report

    SciTech Connect

    Colp, J.L.

    1982-04-01

    The technical feasibility of extracting energy from magma bodies is explored. Five aspects of the project are studied: resource location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction.

  17. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    SciTech Connect

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  18. Velocity Measurements at Three Fish Screening Facilities in the Yakima Basin, Washington : Summer 1989 Annual Report.

    SciTech Connect

    Abernethy, C. Scott; Neitzel, Duane A.; Lusty, E. William

    1990-09-01

    The Pacific Northwest Laboratory (PNL) measured the velocity conditions at three fish screening facilities in the Yakima River Basin: Wapato, Chandler, and Easton Screens. The measurement objectives were different at the three screens. At Wapato, approach and sweep velocities were measured to evaluate the effect of rearing pens in the screen forebay. A complete survey was performed at the Chandler Screens. At Easton, velocity was measured behind the screens to provide information for the installation of porosity boards to balance flow through the screens. Salmon-rearing pens used at the Wapato Canal had a minimal effect on the magnitude of approach and sweep velocities at the face of the drum screens, although the pens caused increased turbulence and variability in water velocities. The net pens did not appear to affect flows through the three fish bypasses. 8 refs., 17 figs., 5 tabs.

  19. State of Idaho Augmented Anadromous Fish Health Monitoring, 1987 Annual Report.

    SciTech Connect

    Foott, J. Scott; Hauck, A. Kent

    1988-05-01

    The anadromous fish health monitoring program began in full operation in January 1988 after the hiring of the lead pathologist. This short operating period limits the amount of information available at the time of this writing. Pre-release sampling of smolts revealed the presence of several sub-clinical pathogens. Organosomatic analysis results demonstrated no major abnormalities in the examined stocks. The results of the 1988 steelhead broodstock sampling are still pending.

  20. Fifteenmile Basin Habitat Improvement Project: 1990 Annual Report.

    SciTech Connect

    Asbridge, Gary M.

    1993-12-01

    U.S.D.A. Forest Service activities in the Fifteenmile basin during 1990 involved the placement of 84 log structures in a two mile reach of Fifteenmile Creek (RM 45.4-47.4) by a combination of falling trees into the channel, bucking in blowdown trees spanning the creek, and winching in existing blowdown and log segments from newly fallen trees. The primary project objective on Fifteenmile Creek was to increase physical habitat diversity and rearing habitat for age l+ winter steelhead trout. USFS personnel also conducted spring spawning surveys in sections of Ramsey and Eightmile Creeks, physical habitat pre-project monitoring in the above project reach, water temperature monitoring, and macroinvertebrate sampling.

  1. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    SciTech Connect

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  2. FY2003 LDRD Final Annual Report Article: Pathogen Pathway Project

    SciTech Connect

    Fitch, J P; McCutchen-Maloney, S L

    2003-11-10

    Understanding virulence mechanisms of bacterial pathogens is vital to anticipating biological threats and to improving detectors, vaccines, and treatments. This project will characterize factors responsible for virulence of Yersinia pestis, the causative agent of plague and a biothreat agent, which has an inducible Type III secretion virulence mechanism also found in other animal, plant, and human pathogens. Our approach relies on genomic and proteomic characterization of Y. pestis in addition to a bioinformatic infrastructure. Scientific and technical capabilities developed in this project can be applied to other microbes of interest. This work will establish a significant new direction for biodefense at LLNL and expand our national and international scientific collaborations.

  3. Identification, expression and function of apolipoprotein E in annual fish Nothobranchius guentheri: implication for an aging marker.

    PubMed

    Wang, Xia; Shang, Xiaomei; Luan, Jing; Zhang, Shicui

    2014-06-01

    Apolipoprotein E (apoE) is a lipid-associated protein present in both plasma and in central nervous system. Variation in apoE gene has been reported to be associated with longevity in humans as well as with aged diseases such as atherosclerosis, Alzheimer's disease, and Parkinson's disease. However, information regarding the function and structure-activity relationship of apoE in lower vertebrates is rather limited. In this study we show that the apoE gene from the annual fish Nothobranchius guentheri, NapoE, encodes a protein of 262 amino acids, which shares common structural features characteristic of mammalian apoE. We also show that like human apoE, recombinant NapoE is able to inhibit LDL oxidation, and it is the N-terminal domain of NapoE with lysine or arginine residues that plays a key role in inhibition of LDL oxidation. NapoE is predominantly expressed in the liver of N. guentheri, consistent with that in mammalian species. More importantly, we demonstrate an age-dependent down-regulation of NapoE gene, rendering it a suitable biomarker of aging. This lays a foundation for further study of the role of apoE in the aging process of fish. PMID:24573419

  4. Program Improvement Project for Industrial Education. Annual Report.

    ERIC Educational Resources Information Center

    Shaeffer, Bruce W.

    Designed to improve industrial education programs through the development of minimum uniform quality standards, a project developed a task list, educationally sequenced the identified tasks, and developed a recommended shop layout and equipment list for four occupational areas: diesel repair, appliance repair, office machine repair, and small…

  5. Pacific Lamprey Research and Restoration Project : Annual Report 2000.

    SciTech Connect

    Close, David A.

    2002-11-01

    This report summarizes results of research activities conducted in 1999-2000. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin.

  6. Texas State Department of Health Migrant Project. Annual Report 1971.

    ERIC Educational Resources Information Center

    Texas State Dept. of Health Resources, Austin.

    The Texas Migrant Health Project under the State Department of Health aims to: (1) promote and improve medical, dental, and public health services for the domestic agricultural worker and his dependents and (2) encourage and support migrant efforts to participate in and be responsible for personal and family health. During 1969-70, the state was…

  7. Vocational Education Evaluation Project: Annual Report--Fiscal Year 1973.

    ERIC Educational Resources Information Center

    Oliver, J. Dale; And Others

    The primary objective of the Vocational Education Evaluation Project (VEEP) is to develop a management information system for the planning and programing of vocational education. The work has been divided into a macro-system (primarily concerned with guidelines and systematic procedures at the State level) and a micro-system (emphasizing the…

  8. Single Parent Project. Annual Report, 1990. Continuation Proposal.

    ERIC Educational Resources Information Center

    Eastern Washington Univ., Cheney.

    The Single Parent Project (SPP) at Eastern Washington University assists single parents on public assistance who are working toward an academic degree in order to become independent from the welfare system. The SPP provides campus-based services that help students succeed in an academic setting. Four areas of focus for the SPP are: (1) direct…

  9. Rural Women Proprietorship Project. Research and Development Annual Report.

    ERIC Educational Resources Information Center

    Hazard Community Coll., KY.

    A project was created to provide individualized and technical training specially designed for women who desired to become small business owners. Recruitment of eastern Kentucky women in the Hazard Community College five-county service area was done through direct mailing; posting of flyers; and newspaper, radio, and television publicity. In…

  10. Nez Perce Tribal Hatchery Project, 1998 Annual Report.

    SciTech Connect

    Johnson, David B.; Larson, Roy Edward; Walker, Grant W.

    2000-01-27

    This report consists of activities/events conducted in response to the Objectives and Tasks described in the 1998 contract Statement Of Work for the Planning and Predesign activities of the Nez Perce Tribal Hatchery (NPTH). The report follows the format of the contract for ease in finding accomplishments. Although specific emphasis will be placed on activities related directly to the NPTH, activities from other artificial production related projects may also be noted because of overlap in staff duties and production facilities. Additionally, the project leader's role has evolved as other Tribal fisheries projects have been developed and assigned to the Production Services Division, Department of Fisheries Resource Management (DFRM), Nez Perce Tribe (NPT). Thus, implementation of the project leader role for the NPTH actually entails specific duties of the Hatchery Supervisor, the Production Coordinator as well as the Production Director. The Production Director, Ed Larson was absent mos t of January and part of February before he began working part time from home while recovering from back surgery.

  11. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    SciTech Connect

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  12. Yakima and Touchet River Basins Phase II Fish Screen Evaluation, 2006-2007 Annual Report.

    SciTech Connect

    Chamness, Mickie; Tunnicliffe, Cherylyn

    2007-03-01

    In 2006, Pacific Northwest National Laboratory (PNNL) researchers evaluated 27 Phase II fish screen sites in the Yakima and Touchet river basins. Pacific Northwest National Laboratory performs these evaluations for Bonneville Power Administration (BPA) to determine whether the fish screening devices meet those National Marine Fisheries (NMFS) criteria for juvenile fish screen design, that promote safe and timely passage of juvenile salmonids. The NMFS criteria against which the sites were evaluated are as follows: (1) a uniform flow distribution over the screen surface to minimize approach velocity; (2) approach velocities less than or equal to 0.4 ft/s protects the smallest salmonids from impingement; (3) sweep velocities that are greater than approach velocities to minimize delay of out-migrating juveniles and minimize sediment deposition near the screens; (4) a bypass flow greater than or equal to the maximum flow velocity vector resultant upstream of the screens to also minimize delay of out-migrating salmonids; (5) a gradual and efficient acceleration of flow from the upstream end of the site into the bypass entrance to minimize delay of out-migrating salmonids; and (6) screen submergence between 65% and 85% for drum screen sites. In addition, the silt and debris accumulation next to the screens should be kept to a minimum to prevent excessive wear on screens, seals and cleaning mechanisms. Evaluations consist of measuring velocities in front of the screens, using an underwater camera to assess the condition and environment in front of the screens, and noting the general condition and operation of the sites. Results of the evaluations in 2006 include the following: (1) Most approach velocities met the NMFS criterion of less than or equal to 0.4 ft/s. Of the sites evaluated, 31% exceeded the criterion at least once. Thirty-three percent of flat-plate screens had problems compared to 25% of drum screens. (2) Woody debris and gravel deposited during high river

  13. Umatilla River Fish Passage Operations Program, 2000-2001 Annual Report.

    SciTech Connect

    Zimmerman, Brian C.; Duke, Bill B.

    2003-02-01

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 17, 2000 to July 7, 2001. A total of 3,662 summer steelhead (Oncorhynchus mykiss); 643 adult, 437 jack, and 4,948 subjack fall chinook (O. tshawytscha); 4,654 adult and 1,276 jack coho (O. kisutch); and 4,382 adult and 185 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 14 summer steelhead and 847 adult and 74 jack spring chinook were hauled upstream from Threemile Dam. There were 3,433 summer steelhead; 71 adult, 298 jack and 4,647 subjack fall chinook; 4,435 adult and 1,180 jack coho; and 2,873 adult and 55 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. In addition, 116 summer steelhead; 565 adult and 38 jack fall chinook; and 646 adult and 31 jack spring chinook were collected for brood. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 147 days between February 5 and July 26, 2001. During that period, fish were bypassed back to the river 127 days and were trapped 18 days. An estimated 350 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 92% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was open throughout the summer of 2000 and continued to run until October 27, 2000. The bypass was reopened March 8, 2001 and ran until July 9, 2001. The juvenile trap was not operated this year.

  14. Advanced Turbine Technology Applications Project (ATTAP). 1944 Annual report

    SciTech Connect

    1995-06-01

    This report summarizes work performed in development and demonstration of structural ceramics technology for automotive gas turbine engines. At the end of this period, the project name was changed to ``Ceramic Turbine Engine Demonstration Project``, effective Jan. 1995. Objectives are to provide early field experience demonstrating the reliability and durability of ceramic components in a modified, available gas turbine engine application, and to scale up and improve the manufacturing processes for ceramic turbine engine components and demonstrate the application of these processes in the production environment. The 1994 ATTAP activities emphasized demonstration and refinement of the ceramic turbine nozzles in the AlliedSignal/Garrett Model 331-200[CT] engine test bed in preparation for field testing; improvements in understanding the vibration characteristics of the ceramic turbine blades; improvements in critical ceramics technologies; and scaleup of the process used to manufacture ceramic turbine components.

  15. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    SciTech Connect

    Not Available

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  16. Chief Joseph Kokanee Enhancement Project : Confederated Tribes of the Colville Reservaton 1997 Annual Report.

    SciTech Connect

    LeCaire, Richard

    1998-01-01

    In the early 1980's the Confederated Tribes of the Colville Reservation, the Spokane Tribe of Indians and the Washington Dept. of Fish and Wildlife developed a management plan for Lake Roosevelt on the restoration and enhancement of kokanee salmon populations using hatchery out plants and the restoration of natural spawning runs. The plan was incorporated into the Northwest Power Planning Council (NPPC) in their 1987 Columbia Basin Fish and Wildlife program as partial mitigation for hydropower caused fish losses resulting from the construction of Grand Coulee Dam. The Chief Joseph Kokanee Enhancement Project, as part of a basin wide effort, is evaluating the status of the natural production kokanee in streams tributary to Lakes Roosevelt and Rufus Woods and is examining entrainment through Grand Coulee Dam. The goal of this project is the protection and enhancement of the natural production kokanee in these two lakes. The project is currently collecting data under four phases or parts. Since 1991, Lake Whatcom Washington origin kokanee have been planted in considerable numbers into the waters of Lake Roosevelt. A natural production kokanee fishery has persisted in the lake since the early 1970's(Cash, 1995), (Scholz, 1991). Historical information alludes to wild Kokanee production in the San Poil River, Nespelem River, Big Sheep Creek, Ora-Pa-Ken Creek, Deep Creek and Onion Creeks. The genetic makeup of the fish within the fishery is unknown, as is their contribution to the fishery. The level of influence by the hatchery out planted stock on wild fish stocks is unknown as well. Project outcomes will indicate the genetic fitness for inclusion of natural production kokanee stocks into current Bonneville Power Administration funded hatchery programs. Other findings may determine contribution/interaction of/between wild/hatchery kokanee stocks found in the waters of Lake Franklin D. Roosevelt.

  17. Anadronous Fish Habitat Enhancement for the Middle Fork and Upper Salmon River, 1988 Annual Report.

    SciTech Connect

    Andrews, John

    1990-01-01

    The wild and natural salmon and steelhead populations in the Middle Fork and Upper Salmon River are at a critical low. Habitat enhancement through decreasing sediment loads, increasing vegetative cover, removing passage barriers, and providing habitat diversity is imperative to the survival of these specially adapted fish, until passage problems over the Columbia River dams are solved. Personnel from the Boise and Sawtooth National Forests completed all construction work planned for 1988. In Bear Valley, 1573 feet of juniper revetment was constructed at eleven sites, cattle were excluded from 1291 feet of streambanks to prevent bank breakdown, and a small ephemeral gully was filled with juniper trees. Work in the Upper Salmon Drainage consisted of constructing nine rock sills/weirs, two rock deflectors, placing riprap along forty feet of streambank, construction of 2.1 miles of fence on private lands, and opening up the original Valley Creek channel to provide spring chinook passage to the upper watershed. A detailed stream survey of anadromous fish habitat covering 72.0 miles of streams in the Middle Fork Sub-basin was completed.

  18. 24 CFR 880.503 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Maximum annual commitment and project account. 880.503 Section 880.503 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  19. 24 CFR 883.604 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Maximum annual commitment and project account. 883.604 Section 883.604 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  20. 24 CFR 880.503 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Maximum annual commitment and project account. 880.503 Section 880.503 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  1. 24 CFR 880.503 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Maximum annual commitment and project account. 880.503 Section 880.503 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  2. 24 CFR 883.604 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maximum annual commitment and project account. 883.604 Section 883.604 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  3. 24 CFR 883.604 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Maximum annual commitment and project account. 883.604 Section 883.604 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  4. 24 CFR 880.503 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maximum annual commitment and project account. 880.503 Section 880.503 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  5. 24 CFR 883.604 - Maximum annual commitment and project account.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Maximum annual commitment and project account. 883.604 Section 883.604 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING...

  6. Title I ESEA Projects: Digest of Annual Evaluations. Supplementary Edition 1976-77. Report No. 77131.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    This digest provides a historical summary of the key findings reported in the annual evaluations of each of the Philadelphia, Pennsylvania school district's Title I, Elementary and Secondary Education Act projects since 1975. The 1976-1977 management information, the 1975-1976 key findings, and the preliminary findings for 1976-1977 are presented.…

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  9. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect

    West Valley Nuclear Services Company and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  10. Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed; Anadromous Fish Habitat Restoration in the Nichols Canyon Subwatershed, 2001 Annual Report.

    SciTech Connect

    Koziol, Deb

    2002-02-01

    Big Canyon Creek historically provided quality spawning and rearing habitat for A-run wild summer steelhead in the Clearwater River subbasin (Fuller, 1986). However, high stream temperatures, excessive sediment and nutrient loads, low summer stream flows, and little instream cover caused anadromous fish habitat constraints in the creek. The primary sources of these nonpoint source pollution and habitat degradations are attributed to agricultural, livestock, and forestry practices (NPSWCD, 1995). Addressing these problems is made more complex due to the large percentage of privately owned lands in the watershed. Nez Perce Soil and Water Conservation District (NPSWCD) seeks to assist private, tribal, county, and state landowners in implementing Best Management Practices (BMPs) to reduce nonpoint source pollutants, repair poorly functioning riparian zones, and increase water retention in the Nichols Canyon subwatershed. The project funds coordination, planning, technical assistance, BMP design and installation, monitoring, and educational outreach to identify and correct problems associated with agricultural and livestock activities impacting water quality and salmonid survival. The project accelerates implementation of the Idaho agricultural water quality management program within the subwatershed.

  11. Mississippi graduate DOE EPSCor trainee project. [First Annual Summary Report

    SciTech Connect

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  12. Mississippi graduate DOE EPSCor trainee project. First annual summary report

    SciTech Connect

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  13. Fall Chinook Aclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2001.

    SciTech Connect

    McLeod, Bruce

    2004-01-01

    Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, are located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, is located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, and will ultimately work towards achieving

  14. NREL Energy Storage Projects. FY2014 Annual Report

    SciTech Connect

    Pesaran, Ahmad; Ban, Chunmei; Burton, Evan; Gonder, Jeff; Grad, Peter; Jun, Myungsoo; Keyser, Matt; Kim, Gi-Heon; Neubauer, Jeremy; Santhanagopalan, Shriram; Saxon, Aron; Shi, Ying; Smith, Kandler; Sprague, Michael; Tenent, Robert; Wood, Eric; Yang, Chuanbo; Zhang, Chao; Han, Taeyoung; Hartridge, Steve; Shaffer, Christian E.

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Battery Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.

  15. FY2011 Annual Report for NREL Energy Storage Projects

    SciTech Connect

    Pesaran, A.; Ban, C.; Dillon, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Lee, K. J.; Long, D.; Neubauer, J.; Santhangopalan, S.; Smith, K.

    2012-04-01

    This report describes the work of NREL's Energy Storage group for FY2011. The National Renewable Energy Laboratory (NREL) supports energy storage R&D under the Vehicle Technologies Program at the U.S. Department of Energy (DOE). The DOE Energy Storage program's charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation's goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are: (1) Advanced Battery Development [through the United States Advanced Battery Consortium (USABC)]; (2) Testing, Design and Analysis (TDA); (3) Applied Battery Research (ABR); and (4) Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT). In FY11, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL's R&D projects in FY11 in support of the USABC, TDA, ABR, and BATT program elements. In addition, we continued the enhancement of NREL's battery testing facilities funded through the American Reinvestment and Recovery Act (ARRA) of 2009. The FY11 projects under NREL's Energy Storage R&D program are briefly described below. Each of these is discussed in depth in the main sections of this report.

  16. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  17. FY2011 Annual Report for the Actinide Isomer Detection Project

    SciTech Connect

    Warren, Glen A.; Francy, Christopher J.; Ressler, Jennifer J.; Erikson, Luke E.; Tatishvili, Gocha; Hatarik, R.

    2011-10-01

    This project seeks to identify a new signature for actinide element detection in active interrogation. This technique works by exciting and identifying long-lived nuclear excited states (isomers) in the actinide isotopes and/or primary fission products. Observation of isomers in the fission products will provide a signature for fissile material. For the actinide isomers, the decay time and energy of the isomeric state is unique to a particular isotope, providing an unambiguous signature for SNM. This project entails isomer identification and characterization and neutron population studies. This document summarizes activities from its third year - completion of the isomer identification characterization experiments and initialization of the neutron population experiments. The population and decay of the isomeric state in 235U remain elusive, although a number of candidate gamma rays have been identified. In the course of the experiments, a number of fission fragment isomers were populated and measured [Ressler 2010]. The decays from these isomers may also provide a suitable signature for the presence of fissile material. Several measurements were conducted throughout this project. This report focuses on the results of an experiment conducted collaboratively by PNNL, LLNL and LBNL in December 2010 at LBNL. The measurement involved measuring the gamma-rays emitted from an HEU target when bombarded with 11 MeV neutrons. This report discussed the analysis and resulting conclusions from those measurements. There was one strong candidate, at 1204 keV, of an isomeric signature of 235U. The half-life of the state is estimated to be 9.3 {mu}s. The measured time dependence fits the decay time structure very well. Other possible explanations for the 1204-keV state were investigated, but they could not explain the gamma ray. Unfortunately, the relatively limited statistics of the measurement limit, and the lack of understanding of some of the systematic of the experiment, limit

  18. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    SciTech Connect

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions favorable for a fish

  19. Study to Determine the Biological Feasibility of a New Fish Tagging System : Annual Report 1983.

    SciTech Connect

    Prentice, Earl F.; Park, D.L.

    1984-05-01

    Pacific salmon are tagged or marked as a critical part of numerous research and management studies. A new tag called the PIT (passive integrated transponder) tag measuring 7.5 mm long by 1.5 mm in diameter has a great potential for marking fish if it proves to be biologically compatible. A study was conducted to evaluate the potential of the PIT tag for marking salmonids. The objectives of the first year's research were to determine: (1) the anatomical areas in which the tag could be placed; (2) tissue response to the tag; and (3) tag retention. Juvenile coho, Oncorhynchus kisutch, and chinook O. tshawytscha, salmon and adult chinook salmon held at Manchester or Big Beef Creek, Washington, were used as test animals. Juvenile salmon were injected with sham PIT tags in the body cavity and opercular, dorsal, and caudal masculature. The fish ranged in length from 126 to 212 mm. Observations based on three tests, from 44 to 102 days long, indicated that the dorsal musculature and body cavity were the best locations to inject the tag from biological and social standpoints. Sham PIT tags were injected into the nose; body cavity; and opercular, dorsal, and caudal musculature of jack chinook salmon. The test was conducted for 23 days. Although all five anatomical areas were acceptable from a technical standpoint, the body cavity appeared to be the best area for tag placement. Initial test results with the Sham PIT tag were very encouraging. Apparently the PIT tag can be successfully injected into and carried by salmon, making it a potentially useful tool for fisheries biologists. 5 refs., 8 figs., 6 tabs.

  20. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    SciTech Connect

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  1. Hydrogen engine performance analysis project. Second annual report

    SciTech Connect

    Adt, Jr., R. R.; Swain, M. R.; Pappas, J. M.

    1980-01-01

    Progress in a 3 year research program to evaluate the performance and emission characteristics of hydrogen-fueled internal combustion engines is reported. Fifteen hydrogen engine configurations will be subjected to performance and emissions characterization tests. During the first two years, baseline data for throttled and unthrottled, carburetted and timed hydrogen induction, Pre IVC hydrogen-fueled engine configurations, with and without exhaust gas recirculation (EGR) and water injection, were obtained. These data, along with descriptions of the test engine and its components, the test apparatus, experimental techniques, experiments performed and the results obtained, are given. Analyses of other hydrogen-engine project data are also presented and compared with the results of the present effort. The unthrottled engine vis-a-vis the throttled engine is found, in general, to exhibit higher brake thermal efficiency. The unthrottled engine also yields lower NO/sub x/ emissions, which were found to be a strong function of fuel-air equivalence ratio. (LCL)

  2. Albeni Falls Wildlife Mitigation Project, 2001 Annual Report.

    SciTech Connect

    Terra-Burns, Mary

    2002-02-11

    The Albeni Falls Interagency Work Group was actively engaged in implementing wildlife mitigation activities in 2001. The Work Group met quarterly to discuss management and budget issues affecting the Albeni Falls Wildlife Mitigation Program. Work Group members protected 851 acres of wetland habitat in 2001. Wildlife habitat protected to date for the Albeni Falls project is approximately 5,248.31 acres ({approx}4,037.48 Habitat Units). Approximately 14% of the total wildlife habitat lost has been mitigated. Administrative activities increased as funding was more evenly distributed among Work Group members and protection opportunities became more time consuming. In 2001, Work Group members focused on development and implementation of the monitoring and evaluation program as well as completion of site-specific management plans. With the implementation of the monitoring and evaluation program, and as management plans are reviewed and executed, on the ground management activities are expected to increase in 2002.

  3. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    SciTech Connect

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  4. FY2010 Annual Report for the Actinide Isomer Detection Project

    SciTech Connect

    Warren, Glen A.; Francy, Christopher J.; Ressler, Jennifer J.; Erikson, Luke E.; Miller, Erin A.; Hatarik, R.

    2011-01-01

    This project seeks to identify a new signature for actinide element detection in active interrogation. This technique works by exciting and identifying long-lived nuclear excited states (isomers) in the actinide isotopes and/or primary fission products. Observation of isomers in the fission products will provide a signature for fissile material. For the actinide isomers, the decay time and energy of the isomeric state is unique to a particular isotope, providing an unambiguous signature for Special Nuclear Materials (SNM). Future work will include a follow-up measurement scheduled for December 2010 at LBNL. Lessons learned from the July 2010 measurements will be incorporated into these new measurements. Analysis of both the July and December experiments will be completed in a few months. A research paper to be submitted to a peer-reviewed journal will be drafted if the conclusions from the measurements warrant publication.

  5. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  6. Development of a more fish tolerant turbine runner advanced hydropower turbine project. Final report

    SciTech Connect

    Cook, T.C.; Hecker, G.E.; Faulkner, H.B.; Jansen, W.

    1997-01-01

    The Hidrostal pump is a single bladed combined screw/centrifugal pump which has been proven to transport fish with minimal injury. The focus of the ARL/NREC research project was to develop a new runner geometry which is effective in downstream fish passage and hydroelectric power generation. A flow of 1,000 cfs and a head in the range of 75 ft to 100 ft were selected for conceptual design of the new runner. Criteria relative to hydraulic characteristics which are favorable for fish passage were prepared based on a reassessment of the available information. Important criteria used to develop the new runner design included low pressure change rates, minimum absolute pressures, and minimum shear. Other criteria which are reflected in the runner design are a minimum number of blades (only two), minimum total length of leading edges, and large flow passages. Flow characteristics of the new runner were analyzed using two- dimensional and three-dimensional Computational Fluid Dynamic (CFD) models. The basic runner geometry was initially selected using the two-dimensional model. The three-dimensional model was used to investigate the flow characteristics in detail through the entire runner and to refine the design by eliminating potential problem areas at the leading and trailing edges. Results of the analyses indicated that the runner has characteristics which should provide safe fish passage with an overall power efficiency of approximately 90%. The size of the new runner, which is larger than conventional turbine runners with the same design flow and head, will provide engineering, fabrication, and installation.challenges related to the turbine components and the civil works. A small reduction in the overall efficiency would reduce the size of the runner considerably, would simplify the turbine manufacturing operations, and would allow installation of the new turbine at more hydroelectric sites.

  7. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    SciTech Connect

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  8. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  9. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    NASA Astrophysics Data System (ADS)

    1994-07-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  10. From the bush to the bench: the annual Nothobranchius fishes as a new model system in biology.

    PubMed

    Cellerino, Alessandro; Valenzano, Dario R; Reichard, Martin

    2016-05-01

    African annual fishes from the genus Nothobranchius are small teleosts that inhabit temporary water bodies subject to annual desiccation due to the alternation of the monsoon seasons. Given their unique biology, these fish have emerged as a model taxon in several biological disciplines. Their increasing popularity stems from the extremely short lifespan that is the result of their specific life-history adaptations and is retained under laboratory conditions. Nothobranchius furzeri, the most popular laboratory species, is the vertebrate species with the shortest lifespan recorded in captivity. In the laboratory, adults of different Nothobranchius species and populations live between 3 and 18 months and, notably, there is a negative correlation between the captive lifespan of a species and the aridity of their habitat. Their short lifespan is coupled to rapid age-dependent functional decline and expression of cellular and molecular changes comparable to those observed in other vertebrates, including humans. The recent development of transgenesis in this species makes it possible to insert specific constructs into their genome, and the establishment of transgenic lines is facilitated by their very rapid generation time, which can be as short as 1 month. This makes Nothobranchius species particularly suited for investigating biological and molecular aspects of ageing and ageing-associated dysfunctions. At the same time, they also represent a unique model taxon to investigate the evolution of life-history adaptations and their genetic architecture. We review their natural history, including phylogenetic relationships, distribution in relation to habitat conditions and natural selection for differential longevity, population structure and demography, and life cycle with emphasis on diapause that may occur at three stages during embryonic development. We further critically evaluate their use as a laboratory model for understanding the evolution of a rapid ageing rate and

  11. Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2003.

    SciTech Connect

    McLeod, Bruce

    2004-01-01

    Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, were located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, was located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, targeted to work towards achieving

  12. Healy Clean Coal Project 1993 annual progress report

    SciTech Connect

    Not Available

    1994-06-01

    The primary objective of the HCCP is to demonstrate a new power plant design integrating an advanced combustor and heat recovery system coupled with both high and low temperature emission control processes. The parties anticipate that, if the demonstration project is successful, the technology will be commercialized in the late 1990s and be capable of (1) achieving significant reductions in the emissions of sulfur dioxide and the oxides of nitrogen from existing facilities, (2) providing for future energy needs in an environmentally acceptable manner. Alaskan bituminous and subbituminous coals will be the fuels. Emissions of SO{sub 2}, and NO{sub x}, from the plant will be controlled using TRW`s slagging coal combustor with limestone injection, in conjunction with a boiler supplied by Foster Wheeler. Further SO{sub 2}, and particulate removal will be accomplished using Joy Technologies, Inc.`s (Joy) Activated Recycle Spray Absorber System. Successful demonstration of these technologies is expected to result in NO{sub x}, emissions of less than 0.2 lb/MMBtu and SO{sub 2}, removal efficiencies greater than 90 percent. The heart of the system being demonstrated is a combustion system. Each combustor consists of two cylindrical sections followed by a short duct that connects the combustor to the boiler. A precombustor burns about 35 percent of the coal to preheat the main combustor secondary air. The preheated air enters the main combustor section tangentially to impart a swirling motion to the coal and air. The balance of the coal is injected axially through multiple injection ports at the front end of this cylindrical section.

  13. Pacific Lamprey Research and Restoration Project : Annual Report 1999.

    SciTech Connect

    Close, David A.

    2001-10-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  14. Modular Pebble Bed Reactor Project, University Research Consortium Annual Report

    SciTech Connect

    Petti, David Andrew

    2000-07-01

    This project is developing a fundamental conceptual design for a gas-cooled, modular, pebble bed reactor. Key technology areas associated with this design are being investigated which intend to address issues concerning fuel performance, safety, core neutronics and proliferation resistance, economics and waste disposal. Research has been initiated in the following areas: · Improved fuel particle performance · Reactor physics · Economics · Proliferation resistance · Power conversion system modeling · Safety analysis · Regulatory and licensing strategy Recent accomplishments include: · Developed four conceptual models for fuel particle failures that are currently being evaluated by a series of ABAQUS analyses. Analytical fits to the results are being performed over a range of important parameters using statistical/factorial tools. The fits will be used in a Monte Carlo fuel performance code, which is under development. · A fracture mechanics approach has been used to develop a failure probability model for the fuel particle, which has resulted in significant improvement over earlier models. · Investigation of fuel particle physio-chemical behavior has been initiated which includes the development of a fission gas release model, particle temperature distributions, internal particle pressure, migration of fission products, and chemical attack of fuel particle layers. · A balance of plant, steady-state thermal hydraulics model has been developed to represent all major components of a MPBR. Component models are being refined to accurately reflect transient performance. · A comparison between air and helium for use in the energy-conversion cycle of the MPBR has been completed and formed the basis of a master’s degree thesis. · Safety issues associated with air ingress are being evaluated. · Post shutdown, reactor heat removal characteristics are being evaluated by the Heating-7 code. · PEBBED, a fast deterministic neutronic code package suitable for

  15. Chief Joseph Kokanee Enhancement Project : Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grond Coulee Dam Third Powerplant Forebay.

    SciTech Connect

    Simmons, M.A.; McKinstry, C.A.; Simmons, C.S.

    2002-01-01

    Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC's Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the first year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory (PNNL). The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. Analysis of the effect of strobe lights on the distribution (numbers) and behavior of kokanee and rainbow trout was based on 51, 683 fish targets detected during the study period (June 30 through August 1, 2001). Study findings include the following: (1) Analysis of the count data indicated that significantly more fish were present when the lights were on compared to off. This was true for both the 24-hr tests as well as the 1-hr tests. Powerplant discharge, distance from lights, and date were significant factors in the analysis. (2) Behavioral results indicated that fish within 14 m of the lights were trying to avoid the lights by swimming across the lighted region or

  16. Natural Production Monitoring and Evaluation; Idaho Department of Fish and Game, 2003-2004 Annual Report.

    SciTech Connect

    Copeland, Timothy; Johnson, June; Bunn, Paul

    2004-12-01

    This report covers the following 3 parts of the Project: Part 1--Monitoring age composition of wild adult spring and summer Chinook salmon returning to the Snake River basin in 2003 to predict smolt-to-adult return rates Part 2--Development of a stock-recruitment relationship for Snake River spring/summer Chinook salmon to forecast natural smolt production Part 3--Improve the precision of smolt-to-adult survival rate estimates for wild steelhead trout by PIT tagging additional juveniles.

  17. Natural Production Monitoring and Evaluation; Idaho Department of Fish and Game, 2002-2003 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Johnson, June; Bunn, Paul

    2006-06-01

    This report covers the following 3 parts of the project: Part 1--Improve wild steelhead trout smolt-to-adult survival rate information by PIT tagging additional wild steelhead trout juveniles. Part 2--Estimating the stock-recruitment relationship for Snake River spring/summer chinook salmon and forecasting wild/natural smolt production. Part 3--Monitoring age composition of wild adult spring and summer chinook salmon returning to the Snake River basin.

  18. Fish Dishes.

    ERIC Educational Resources Information Center

    Derby, Marie

    2003-01-01

    Describes an art project that was inspired by Greek pottery, specifically dishes shaped as fish. Explains that fourth-grade students drew a fish shape that was later used to create their clay version of the fish. Discusses how the students examined the pottery to make decisions about color and design. (CMK)

  19. Piscivorous fish exhibit temperature-influenced binge feeding during an annual prey pulse.

    PubMed

    Furey, Nathan B; Hinch, Scott G; Mesa, Matthew G; Beauchamp, David A

    2016-09-01

    Understanding the limits of consumption is important for determining trophic influences on ecosystems and predator adaptations to inconsistent prey availability. Fishes have been observed to consume beyond what is sustainable (i.e. digested on a daily basis), but this phenomenon of hyperphagia (or binge-feeding) is largely overlooked. We expect hyperphagia to be a short-term (1-day) event that is facilitated by gut volume providing capacity to store consumed food during periods of high prey availability to be later digested. We define how temperature, body size and food availability influence the degree of binge-feeding by comparing field observations with laboratory experiments of bull trout (Salvelinus confluentus), a large freshwater piscivore that experiences highly variable prey pulses. We also simulated bull trout consumption and growth during salmon smolt outmigrations under two scenarios: 1) daily consumption being dependent upon bioenergetically sustainable rates and 2) daily consumption being dependent upon available gut volume (i.e. consumption is equal to gut volume when empty and otherwise 'topping off' based on sustainable digestion rates). One-day consumption by laboratory-held bull trout during the first day of feeding experiments after fasting exceeded bioenergetically sustainable rates by 12- to 87-fold at low temperatures (3 °C) and by  ˜1·3-fold at 20 °C. The degree of binge-feeding by bull trout in the field was slightly reduced but largely in agreement with laboratory estimates, especially when prey availability was extremely high [during a sockeye salmon (Oncorhynchus nerka) smolt outmigration and at a counting fence where smolts are funnelled into high densities]. Consumption by bull trout at other settings were lower and more variable, but still regularly hyperphagic. Simulations demonstrated the ability to binge-feed increased cumulative consumption (16-32%) and cumulative growth (19-110%) relative to only feeding at

  20. Evaluation of Juvenile Fish Bypass and Adult Fish Passage Facilities at Three-Mile Falls Dam; Umatilla River, Oregon, 1989 Annual Report.

    SciTech Connect

    Nigro, Anthony A.

    1990-09-01

    We report on our progress from October 1989 through September 1990 on evaluating juvenile fish bypass and adult fish passage facilities at Three Mile Falls Dam on the Umatilla River. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). Study objectives addressed by ODFW and CTUIR are: (1) ODFW (Report A): Operate and evaluate the juvenile fish bypass system in the West Extension Irrigation District canal at Three Mile Falls Dam; and (2) CTUIR (Report 8): Examine the passage of adult salmonids at Three Mile Falls Dam. The study is part of a program to rehabilitate anadromous fish stocks in the Umatilla River Basin that includes restorations of coho salmon Oncorhynchus Wsutch and chinook salmon 0. tshawytscha and enhancement of summer steelhead 0. mytiss.

  1. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    SciTech Connect

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  2. Natural Production Monitoring and Evaluation; Idaho Department of Fish and Game, 2000-2001 Annual Report.

    SciTech Connect

    Kiefer, Russell B.; Anderson, Dave; Johnson, June

    2001-10-01

    This report covers efforts to monitor age composition of wild adult spring/summer chinook salmon returning to the Snake River Basin. Accurately determining the ocean age proportions of wild adult spring/summer chinook salmon is important information for monitoring the status and trends of these species. During this report period, project personnel selected the preferred structure for aging, set up a database to track all samples collected, developed procedures and ordered equipment for structure preparation and reading, and aged the adults that were sampled in 1999. Chinook salmon carcasses were sampled from representative spawning areas throughout the Snake River Basin. Ocean age proportions were determined for each 5 centimeter fork length group for wild adult spring/summer chinook salmon returning to the Snake River. These ocean age proportions were applied to the number and estimated length frequency distribution of wild chinook salmon adults passing Lower Granite Dam to estimate the number of adult returns for each ocean age group.

  3. The integrated Status and Effectiveness Monitoring Program : U.S. Forest Service Fish Abundance and Steelhead Redd Surveys Annual Report : January 1 - December 31, 2008.

    SciTech Connect

    Call, Justin

    2008-12-08

    This contract report is one of a series of reports that document implementation components of the Bonneville Power Administration's (BPA) funded project: Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00, Chris Jordan, NOAA-NWFSC project sponsor). Other components of the project are separately reported, as explained below. The ISEMP project has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical data management, communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring, and Evaluation (RME) program to assess the status of anadromous salmonids populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods requires the testing of multiple approaches. Thus, ISEMP has adopted an approach to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot areas, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework

  4. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    SciTech Connect

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  5. Improvement of Anadromous Fish Habitat and Passage in Omak Creek, 2008 Annual Report : February 1, 2008 to January 31, 2009.

    SciTech Connect

    Dasher, Rhonda; Fisher, Christopher

    2009-06-09

    During the 2008 season, projects completed under BPA project 2000-100-00 included installation of riparian fencing, maintenance of existing riparian fencing, monitoring of at-risk culverts and installation of riparian vegetation along impacted sections of Omak Creek. Redd and snorkel surveys were conducted in Omak Creek to determine steelhead production. Canopy closure surveys were conducted to monitor riparian vegetation recovery after exclusion of cattle since 2000 from a study area commonly known as the Moomaw property. Additional redd and fry surveys were conducted above Mission Falls and in the lower portion of Stapaloop Creek to try and determine whether there has been successful passage at Mission Falls. Monitoring adult steelhead trying to navigate the falls resulted in the discovery of shallow pool depth at an upper pool that is preventing many fish from successfully navigating the entire falls. The Omak Creek Habitat and Passage Project has worked with NRCS to obtain additional funds to implement projects in 2009 that will address passage at Mission Falls, culvert replacement, as well as additional riparian planting. The Omak Creek Technical Advisory Group (TAG) is currently revising the Omak Creek Watershed Assessment. In addition, the group is revising strategy to focus efforts in targeted areas to provide a greater positive impact within the watershed. In 2008 the NRCS Riparian Technical Team was supposed to assess areas within the watershed that have unique problems and require special treatments to successfully resolve the issues involved. The technical team will be scheduled for 2009 to assist the TAG in developing strategies for these special areas.

  6. Yakima/Klickitat Fisheries Project - Klickitat Monitoring and Evaluation, 2007 Annual Report.

    SciTech Connect

    Zendt, Joe; Babcock, Mike

    2006-04-02

    This report describes the results of monitoring and evaluation (M&E) activities for salmonid fish populations and habitat in the Klickitat River subbasin in south-central Washington. The M&E activities described here were conducted as a part of the Bonneville Power Administration (BPA)-funded Yakima/Klickitat Fisheries Project (YKFP) and were designed by consensus of the scientists with the Yakama Nation (YN) Fisheries Program. YKFP is a joint project between YN and Washington Department of Fish and Wildlife (WDFW). Overall YKFP goals are to increase natural production of and opportunity to harvest salmon and steelhead in the Yakima and Klickitat subbasins using hatchery supplementation, harvest augmentation and habitat improvements. Klickitat subbasin M&E activities have been subjected to scientific and technical review by members of the YKFP Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP biologists have transformed the conceptual design into the tasks described. YKFP biologists have also been involved with the Collaborative Systemwide Monitoring and Evaluation Project (CSMEP - a project aimed at improving the quality, consistency, and focus of fish population and habitat data to answer key M&E questions relevant to major decisions in the Columbia Basin) and are working towards keeping Klickitat M&E activities consistent with CSMEP recommendations. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - to gather baseline information in order to characterize habitat and salmonid populations pre- and post-habitat restoration and pre-supplementation. (2) Ecological Interactions - to determine presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information. (3) Genetics - to develop YKFP supplementation broodstock collection

  7. Umatilla River Basin Anadromous Fsh Habitat Enhancement Project : 2000 Annual Report.

    SciTech Connect

    Shaw, R. Todd

    2001-12-31

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2000 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla River Basin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Habitat enhancement projects continued to be maintained on 44 private properties, four riparian easements and one in-stream enhancement agreement were secured, two new projects implemented and two existing projects improved to enhance anadromous fish habitat and natural fisheries production capabilities in the Umatilla River Basin. New project locations included sites on the mid Umatilla River and Buckaroo Creek. Improvements were implemented at existing project sites on the upper Umatilla River and Wildhorse Creek. A stream bank stabilization project was implemented at approximately River Mile 37.4 Umatilla River to stabilize 760 feet of eroding stream bank and improve in-stream habitat diversity. Habitat enhancements at this site included construction of six rock barbs with one large conifer root wad incorporated into each barb, stinging approximately 10,000 native willow cuttings, planting 195 tubling willows and 1,800 basin wildrye grass plugs, and seeding 40 pounds of native grass seed. Staff time to assist in development of a subcontract and fence materials were provided to establish eight spring sites for off-stream watering and to protect wetlands within the Buckaroo Creek Watershed. A gravel bar was moved and incorporated into an adjacent point bar to reduce stream energy and stream channel confinement within the existing project area at River Mile 85 Umatilla River. Approximately 10,000 native willow cuttings were stung and trenched into the stream channel margins and stream banks, and 360

  8. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  9. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1996-10-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

  10. Strong population genetic structuring in an annual fish, Nothobranchius furzeri, suggests multiple savannah refugia in southern Mozambique

    PubMed Central

    2013-01-01

    Background Intraspecific genetic variation of African fauna has been significantly affected by pronounced climatic fluctuations in Plio-Pleistocene, but, with the exception of large mammals, very limited empirical data on diversity of natural populations are available for savanna-dwelling animals. Nothobranchius furzeri is an annual fish from south-eastern Africa, inhabiting discrete temporary savannah pools outside main river alluvia. Their dispersal is limited and population processes affecting its genetic structure are likely a combination of those affecting terrestrial and aquatic taxa. N. furzeri is a model taxon in ageing research and several populations of known geographical origin are used in laboratory studies. Here, we analysed the genetic structure, diversity, historical demography and temporal patterns of divergence in natural populations of N. furzeri across its entire distribution range. Results Genetic structure and historical demography of N. furzeri were analysed using a combination of mitochondrial (partial cytochrome b sequences, 687 bp) and nuclear (13 microsatellites) markers in 693 fish from 36 populations. Genetic markers consistently demonstrated strong population structuring and suggested two main genetic groups associated with river basins. The split was dated to the Pliocene (>2 Mya). The northern group inhabits savannah pools across the basin of the intermittent river Chefu in south-western Mozambique and eastern Zimbabwe. The southern group (from southernmost Mozambique) is subdivided, with the River Limpopo forming a barrier (maximum divergence time 1 Mya). A strong habitat fragmentation (isolated temporary pools) is reflected in significant genetic structuring even between adjacent pools, with a major influence of genetic drift and significant isolation-by-distance. Analysis of historical demography revealed that the expansion of both groups is ongoing, supported by frequent founder effects in marginal parts of the range and evidence

  11. Monitoring habitat restoration projects: U.S. Fish and Wildlife Service Pacific Region Partners for Fish and Wildlife Program and Coastal Program Protocol

    USGS Publications Warehouse

    Woodward, Andrea; Hollar, Kathy

    2011-01-01

    Refuges, Contribute to the implementation of the State Comprehensive Wildlife Conservation Strategies, and Help achieve the objectives of the National Fish Habitat Partnerships and regionally based bird conservation plans (for example, North American Waterfowl Management Plan, U.S. Pacific Island Shorebird Conservation Plans, Intermountain West Regional Shorebird Plan, etc.). The Partners Program accomplishes these priorities by: Developing and maintaining strong partnerships, and delivering on-the-ground habitat restoration projects designed to reestablish habitat function and restore natural processes; Addressing key habitat limiting factors for declining species; Providing corridors for wildlife and decrease impediments to native fish and wildlife migration; and Enhancing native plant communities by reducing invasive species and improving native species composition. The Coastal Program is a voluntary fish and wildlife conservation program that focuses on watershed-scale, long-term collaborative resource planning and on-the-ground restoration projects in high-priority coastal areas. The Coastal Program conducts planning and restoration work on private, State, and Federal lands, and partnerships with other agencies-Native American Tribes, citizens, and organizations are emphasized. Coastal Program goals include restoring and protecting coastal habitat, providing technical and cost-sharing assistance where appropriate, supporting community-based restoration, collecting and developing information on the status of and threats to fish and wildlife, and using outreach to promote stewardship of coastal resources. The diversity of habitats and partners in Region 1 present many opportunities for conducting restoration projects. Faced with this abundance of opportunity, the Partners Program and Coastal Program must ensure that limited staffing and project dollars are allocated to benefit the highest priority resources and achieve the highest quality results for Federal trust

  12. Wind River Watershed Project; Volume II of III Reports F and G, 1998 Annual Report.

    SciTech Connect

    Connolly, Patrick J.

    1999-11-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds.

  13. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... removal of a project, if the United States does not take over a project and no new power or nonpower... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of...

  14. Kelt Reconditioning: A Research Project to Enhance Iteroparity in Columbia Basin Steelhead (Oncorhynchus mykiss), 2004 Annual Report.

    SciTech Connect

    Hatch, Douglas R.; Branstetter, Ryan; Whiteaker, John

    2004-11-01

    experiment. All steelhead kelts received hw-wiegandt multi vit dietary supplement as a means to improve initial nutrition. Long-term steelhead kelts received Moore-Clark pellets to provide essential minerals and nutrients necessary for gonadal redevelopment. Oxytetracycline was administered to all reconditioned fish to boost immune system response following the stress of initial capture. To control parasitic infestations two methods were used, first, after initial capture an intubation of Ivermectin{trademark} was administered to control internal parasites (e.g., Salmincola spp.). Next, a Formalin drip was used for the duration of reconditioning to prevent fungal outbreaks. Captured kelts were separated into three experimental groups: short-term reconditioning, long-term reconditioning, and direct transport and release. Success indicators for the short-term experiment include the proportion of fish that survived the reconditioning process and the proportion of fish that initiated a feeding response. Short-term kelts were reconditioned for 3 to 5 weeks. Surviving specimens were released for natural spawning on May 11, 2004. Survival-to-release was good for the short-term experiment, with a rate of 79.0%. Long-term steelhead kelts are currently being held for a 6-9 month period with a scheduled release in December 2004. Long-term success indicators include the proportion of fish that survived the reconditioning process and the proportion of surviving fish that successfully remature. Survival and rematuration for long-term kelts has not been determined and will be presented in the 2005 annual report. Direct transport and release kelts and short-term reconditioned kelts were radio or acoustic tagged to assess their travel time and migratory behaviors below Bonneville Dam. A total of 29 direct-transport and release kelts and 29 short-term reconditioned kelts received surgically implanted radio tags, and a total of 28 direct-transport/release and 26 short-term reconditioned fish

  15. Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2002.

    SciTech Connect

    McLeod, Bruce

    2003-01-01

    Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, are located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, is located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, targeted to work towards achieving

  16. Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project, Annual Report 2002-2003.

    SciTech Connect

    Sears, Sheryl

    2004-01-01

    The construction of Chief Joseph and Grand Coulee Dams completely and irrevocably blocked anadromous fish migrations to the Upper Columbia River. Historically this area hosted vast numbers of salmon returning to their natal waters to reproduce and die. For the native peoples of the region, salmon and steelhead were a principle food source, providing physical nourishment and spiritual sustenance, and contributing to the religious practices and the cultural basis of tribal communities. The decaying remains of spawned-out salmon carcasses contributed untold amounts of nutrients into the aquatic, aerial, and terrestrial ecosystems of tributary habitats in the upper basin. Near the present site of Kettle Falls, Washington, the second largest Indian fishery in the state existed for thousands of years. Returning salmon were caught in nets and baskets or speared on their migration to the headwater of the Columbia River in British Columbia. Catch estimates at Kettle Falls range from 600,000 in 1940 to two (2) million around the turn of the century (UCUT, Report No.2). The loss of anadromous fish limited the opportunities for fisheries management and enhancement exclusively to those actions addressed to resident fish. The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a mitigation project intended to enhance resident fish populations and to partially mitigate for anadromous fish losses caused by hydropower system impacts. This substitution of resident fish for anadromous fish losses is considered in-place and out-of-kind mitigation. Upstream migration and passage barriers limit the amount of spawning and rearing habitat that might otherwise be utilized by rainbow trout. The results of even limited stream surveys and habitat inventories indicated that a potential for increased natural production exists. However, the lack of any comprehensive enhancement measures prompted the Upper Columbia United Tribes Fisheries Center (UCUT), Colville Confederated

  17. Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project, Annual Report 2001-2002.

    SciTech Connect

    Sears, Sheryl

    2003-01-01

    The construction of Chief Joseph and Grand Coulee Dams completely and irrevocably blocked anadromous fish migrations to the Upper Columbia River. Historically this area hosted vast numbers of salmon returning to their natal waters to reproduce and die. For the native peoples of the region, salmon and steelhead were a principle food source, providing physical nourishment and spiritual sustenance, and contributing to the religious practices and the cultural basis of tribal communities. The decaying remains of spawned-out salmon carcasses contributed untold amounts of nutrients into the aquatic, aerial, and terrestrial ecosystems of tributary habitats in the upper basin. Near the present site of Kettle Falls, Washington, the second largest Indian fishery in the state existed for thousands of years. Returning salmon were caught in nets and baskets or speared on their migration to the headwater of the Columbia River in British Columbia. Catch estimates at Kettle Falls range from 600,000 in 1940 to two (2) million around the turn of the century (UCUT, Report No.2). The loss of anadromous fish limited the opportunities for fisheries management and enhancement exclusively to those actions addressed to resident fish. The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a mitigation project intended to enhance resident fish populations and to partially mitigate for anadromous fish losses caused by hydropower system impacts. This substitution of resident fish for anadromous fish losses is considered in-place and out-of-kind mitigation. Upstream migration and passage barriers limit the amount of spawning and rearing habitat that might otherwise be utilized by rainbow trout. The results of even limited stream surveys and habitat inventories indicated that a potential for increased natural production exists. However, the lack of any comprehensive enhancement measures prompted the Upper Columbia United Tribes Fisheries Center (UCUT), Colville Confederated

  18. Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report

    SciTech Connect

    Crowson, D.; Gibson, J.D.; Haase, C.S.; Holt, R.; Hyndman, D.; Krumhansl, J.; Lauffer, F.; McCord, J.P.; McCord, J.T.; Neel, D.

    1993-10-01

    The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Act (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.

  19. Oregon Wildlife Planning Coordination Project, October 1, 1998 to September 30, 1999 Annual Report.

    SciTech Connect

    Barnes, Susan P.

    1999-10-05

    The intent of the Oregon Wildlife Planning Coordination project is to fund Oregon Department of Fish and Wildlife (ODFW) staff to facilitate wildlife mitigation coordination and planning between Oregon wildlife managers. The primary goal of ODFW wildlife mitigation planning/coordination staff is to foster, facilitate, and manage a statewide cooperative wildlife mitigation planning and implementation effort between the Oregon wildlife managers (the Oregon Wildlife Coalition or OWC) to mitigate for wildlife losses in Oregon caused by the development and operation of the hydropower system.

  20. Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.

    SciTech Connect

    Bradbury, Allen; Slavin, Katie

    1998-10-28

    The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

  1. Colville Confederated Tribes' Performance Project Wildlife Mitigation Acquisitions, Annual Report 2006.

    SciTech Connect

    Whitney, Richard; Berger, Matthew; Tonasket, Patrick

    2006-12-01

    The Colville Confederated Tribes Wildlife Mitigation Project is protecting lands as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. The Mitigation Project protects and manages 54,606 acres for the biological requirements of managed wildlife species that are important to the Colville Tribes. With the inclusion of 2006 acquisitions, the Colville Tribes have acquired approximately 32,018 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. This annual report for 2006 briefly describes that four priority land acquisitions that were considered for enrollment into the Colville Tribes Mitigation Project during the 2006 contract period.

  2. UNOCAL Parachute Creek Shale Oil Project. Monitoring review committee meeting report. Annual meeting, 1987-1988

    SciTech Connect

    Not Available

    1988-05-25

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The support agreement included development of an Environmental Monitoring Plan incorporating existing compliance monitoring and twenty-two supplemental monitoring points for water, air, solid waste, worker health and safety, and socio-economic impacts during the period 1986-1993. A Monitoring Review Committee (MRC) comprised of representatives from the Project, U.S. Department of Treasury, U.S. Department of Energy, U.S. Environmental Protection Agency, and the state convene each year to discuss monitoring information and trends in environmental and health surveillance. This report documents the first annual MRC meeting, held at the Project.

  3. Integrated Hatchery Operations Team: Operations Plans for Anadromous Fish Production Facilities in the Columbia River Basin, Volume I of V; 1992 Annual Report.

    SciTech Connect

    Shelldrake, Tom

    1993-08-01

    Individual operational plans for 1993 are provided for the Abernathy Salmon Culture Technology Center, Carson National Fish Hatchery, Dworshak National Fish Hatchery, Eagle Creek National Fish Hatchery, Entiat National Fish Hatchery, Hagerman National Fish Hatchery, Kooskia National Fish Hatchery, Leavenworth National Fish Hatchery, Little White Salmon National Fish Hatchery, Spring Creek National Fish Hatchery, Warm Springs National Fish Hatchery, Willard National Fish Hatchery, and the Winthrop National Fish Hatchery.

  4. IGCC repowering project clean coal II project public design report. Annual report, October 1992--September 1993

    SciTech Connect

    1993-10-01

    Combustion Engineering, Inc. (CE) is participating in a $270 million coal gasification combined cycle repowering project that was designed to provide a nominal 60 MW of electricity to City, Water, Light and Power (CWL&P) in Springfield, Illinois. The Integrated Gasification Combined Cycle (IGCC) system consists of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-BTU gas; and all necessary coal handling equipment, The project is currently completing the second budget period of five. The major activities to date are: (1) Establishment of a design, cost, and schedule for the project; (2) Establishment of financial commitments; (3) Acquire design and modeling data; (4) Establishment of an approved for design (AFD) engineering package; (5) Development of a detailed cost estimate; (6) Resolution of project business issues; (7) CWL&P renewal and replacement activities; and (8) Application for environmental air permits. A Project Management Plan was generated, The conceptual design of the plant was completed and a cost and schedule baseline for the project was established in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities were accomplished, including the Air Permit Application, completion of the National Environmental Policy Act process, and the draft Environmental Monitoring Plan. At the end of 1992 the DOE requested that Duke Engineering and Services Inc., (DESI) be used to complete the balance of plant cost estimate. DESI was retained to do this work, DESI completed the material take off estimate and included operations, maintenance, and startup in the estimate.

  5. Augmented Fish Health Monitoring for Washington Department of Wildlife; Five-year Project Report, 1986-1991 Final Report.

    SciTech Connect

    Kerwin, John; Roberts, Steve; Oman, Leni; Bolding, Bruce

    1992-04-01

    The Augmented Fish Health Monitoring Project was funded by the Bonneville Power Administration (BPA) with the mandate to collect fish health data on the anadromous fish stocks of the Columbia River Basin in a standardized manner. The Washington Department of Wildlife began the project in 1986. Cumulative data and a final summary for this project are presented in this document. Fish stocks were examined monthly for length, weight, and health status at all Washington Department of Wildlife Columbia River Basin hatcheries. Assays for specific fish pathogens were conducted on all stocks of broodfish and smolts in the study area. Pathogens of interest were replicating viral agents, erythrocytic inclusion body syndrome virus (EIBSV), and Renibacterium salmoninarum. Sea-run cutthroat (SCT) were also sampled midway through the rearing cycle for R. salmoninarum. Juvenile fish were examined for the presence of any pathogen. Assays for Myxobolus cerebralis were conducted on fish stocks in several locations along the Columbia River. An organosomatic index analysis was made on each stock of smolts at the Cowlitz and Wells hatcheries. Results of the organosomatic index analysis were consistent between the years at each facility. However, the fish reared at Cowlitz displayed tissue changes associated with ceratomyxosis while those reared at Wells had a more desirable color and quality. Cell culture assays for viral agents in broodfish were positive for infectious hematopoeitic necrosis virus (IHNV) in all stocks at the Cowlitz Hatchery four out of five years in the study. Other stations were less consistent over the years. Only the sea-run cutthroat stock spawned at Beaver Creek was negative for any virus. Infectious pancreatic necrosis virus (IPNV) was isolated from summer-run steelhead (SS) broodfish at Wells in 1989 and 1991 and at Yakima in 1991. Inclusions that are characteristic of EIBSV were found in red blood cells of brood fish from the Wells Hatchery in 1990 and 1991

  6. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 1999 Annual Report.

    SciTech Connect

    Bluff, Stanley

    2000-12-01

    In October of 1997, The construction of the Kalispel Tribal Hatchery was complete. No spawning activity was recorded for the spring of 1998. On June 14, 1999 the first spawn at the Kalispel Tribal Hatchery was successful. A total of seven nests were fertilized that produced approximately 144,000 fry. The second spawn occurred on July 13, 1999 and a total of six nests were fertilized producing approximately 98,0000 fry. The total amount of largemouth bass fry produced at the Kalispel Tribal Hatchery was 242,000.

  7. Serial correlation and inter-annual variability in relation to the statistical power of monitoring schemes to detect trends in fish populations.

    PubMed

    Nagelkerke, Leopold A J; van Densen, Wim L T

    2007-02-01

    We studied the effects of inter-annual variability and serial correlation on the statistical power of monitoring schemes to detect trends in biomass of bream (Abramis brama) in Lake Veluwemeer (The Netherlands). In order to distinguish between 'true' system variability and sampling variability we simulated the development of the bream population, using estimates for population structure and growth, and compared the resulting inter-annual variabilities and serial correlations with those from field data. In all cases the inter-annual variability in the field data was larger than in simulated data (e.g. for total biomass of all assessed bream sigma = 0.45 in field data, and sigma = 0.03-0.14 in simulated data) indicating that sampling variability decreased statistical power for detecting trends. Moreover, sampling variability obscured the inter-annual dependency (and thus the serial correlation) of biomass, which was expected because in this long-lived population biomass changes are buffered by the many year classes present. We did find the expected serial correlation in our simulation results and concluded that good survey data of long-lived fish populations should show low sampling variability and considerable inter-annual serial correlation. Since serial correlation decreases the power for detecting trends, this means that even when sampling variability would be greatly reduced, the number of sampling years to detect a change of 15%.year(-1) in bream populations (corresponding to a halving or doubling in a six-year period) would in most cases be more than six. This would imply that the six-year reporting periods that are required by the Water Framework Directive of the European Union are too short for the existing fish monitoring schemes. PMID:17219244

  8. Yakima/Klickitat Fisheries Project: Management, Data and Habitat, Annual Report 2001-2002.

    SciTech Connect

    Sampson, Melvin R.

    2002-03-01

    The Yakima/Klickitat Fisheries Project (YKFP or Project) is an all stock initiative that is responding to the need for scientific knowledge for rebuilding and maintaining naturally spawning anadromous fish stocks in both basins. The Yakama Nation, as the Lead Agency, in coordination with the co-managers, Washington Department of Fish and Wildlife and in cooperation with the Bonneville Power Administration, the funding agency, is pursuing this. We are testing the principles of supplementation as a means to rebuild fish populations through the use of locally adapted broodstock in an artificial production program. This concept is being utilized on the Spring Chinook within the Yakima River Basin. The coho and fall chinook programs were approved and implemented in the Yakima Basin. The coho programs principle objective is to determine if naturally spawning coho populations can be reintroduced throughout their biological range in the basin. The objective of the fall chinook program is to determine if supplementation is a viable strategy to increase fall chinook populations in the Yakima subbasin. The coho and fall chinook programs are under the three step process that was established by the Northwest Power Planning Council. The Klickitat subbasin management program is combined with the Yakima subbasin program. This contract includes the Klickitat Basin Coordinator and operational costs for the basin. The Klickitat Subbasin has separate contracts for Monitoring & Evaluation, Construction, and ultimately, Operation and Maintenance. In the Klickitat subbasin, we propose to use supplementation to increase populations of spring chinook and steelhead. This program is still in the developmental stages consistent with the three step process.

  9. Yakima/Klickitat Fisheries Project : Management, Data and Habitat, Annual Report 2002-2003.

    SciTech Connect

    Sampson, Melvin R.

    2002-03-01

    The Yakima/Klickitat Fisheries Project (YKFP or Project) is an all stock initiative that is responding to the need for scientific knowledge for rebuilding and maintaining naturally spawning anadromous fish stocks in both basins. The Yakama Nation, as the Lead Agency, in coordination with the co-managers, Washington Department of Fish and Wildlife and in cooperation with the Bonneville Power Administration, the funding agency, is pursuing this. We are testing the principles of supplementation as a means to rebuild fish populations through the use of locally adapted broodstock in an artificial production program. This concept is being utilized on the Spring Chinook within the Yakima River Basin. The coho and fall chinook programs were approved and implemented in the Yakima Basin. The coho programs principle objective is to determine if naturally spawning coho populations can be reintroduced throughout their biological range in the basin. The objective of the fall chinook program is to determine if supplementation is a viable strategy to increase fall chinook populations in the Yakima subbasin. The coho and fall chinook programs are under the three step process that was established by the Northwest Power Planning Council. The Klickitat subbasin management program is combined with the Yakima subbasin program. This contract includes the Klickitat Basin Coordinator and operational costs for the basin. The Klickitat Subbasin has separate contracts for Monitoring and Evaluation, Construction, and ultimately, Operation and Maintenance. In the Klickitat subbasin, we propose to use supplementation to increase populations of spring chinook and steelhead. This program is still in the developmental stages consistent with the three step process.

  10. National health expenditure projections: modest annual growth until coverage expands and economic growth accelerates.

    PubMed

    Keehan, Sean P; Cuckler, Gigi A; Sisko, Andrea M; Madison, Andrew J; Smith, Sheila D; Lizonitz, Joseph M; Poisal, John A; Wolfe, Christian J

    2012-07-01

    For 2011-13, US health spending is projected to grow at 4.0 percent, on average--slightly above the historically low growth rate of 3.8 percent in 2009. Preliminary data suggest that growth in consumers' use of health services remained slow in 2011, and this pattern is expected to continue this year and next. In 2014, health spending growth is expected to accelerate to 7.4 percent as the major coverage expansions from the Affordable Care Act begin. For 2011 through 2021, national health spending is projected to grow at an average rate of 5.7 percent annually, which would be 0.9 percentage point faster than the expected annual increase in the gross domestic product during this period. By 2021, federal, state, and local government health care spending is projected to be nearly 50 percent of national health expenditures, up from 46 percent in 2011, with federal spending accounting for about two-thirds of the total government share. Rising government spending on health care is expected to be driven by faster growth in Medicare enrollment, expanded Medicaid coverage, and the introduction of premium and cost-sharing subsidies for health insurance exchange plans. PMID:22692089

  11. Projected increases in the annual flood pulse of the Western Amazon

    NASA Astrophysics Data System (ADS)

    Zulkafli, Zed; Buytaert, Wouter; Manz, Bastian; Véliz Rosas, Claudia; Willems, Patrick; Lavado-Casimiro, Waldo; Guyot, Jean-Loup; Santini, William

    2016-01-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research because of its rich biodiversity and the significant role of rainforests in carbon cycling. Climate change has also a direct hydrological impact, and increasing efforts have focused on understanding the hydrological dynamics at continental and subregional scales, such as the Western Amazon. New projections from the Coupled Model Inter-comparison Project Phase 5 ensemble indicate consistent climatic warming and increasing seasonality of precipitation in the Peruvian Amazon basin. Here we use a distributed land surface model to quantify the potential impact of this change in the climate on the hydrological regime of the upper Amazon river. Using extreme value analysis, historical and future projections of the annual minimum, mean, and maximum river flows are produced for a range of return periods between 1 and 100 yr. We show that the RCP 4.5 and 8.5 scenarios of climate change project an increased severity of the wet season flood pulse (7.5% and 12% increases respectively for the 100 yr return floods). These findings agree with previously projected increases in high extremes under the Special Report on Emissions Scenarios climate projections, and are important to highlight due to the potential consequences on reproductive processes of in-stream species, swamp forest ecology, and socio-economy in the floodplain, amidst a growing literature that more strongly emphasises future droughts and their impact on the viability of the rainforest system over greater Amazonia.

  12. Lower Klickitat Riparian and In-channel Habitat Restoration Project, Annual Report 2001-2002.

    SciTech Connect

    Conley, Will

    2003-10-01

    This project focuses on the lower Klickitat River and its tributaries that provide or affect salmonid habitat. The overall goal is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of watersheds supporting anadromous fish production, particularly steelhead (Oncorhyncus mykiss) which are listed as 'Threatened' within the Mid-Columbia ESU. Restoration activities are aimed at restoring stream processes by removing or mitigating watershed perturbances and improving habitat conditions and water quality. In addition to steelhead, habitat improvements benefit Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout, and enhance habitat for many terrestrial and amphibian wildlife species. Protection activities compliment restoration efforts within the subbasin by securing refugia and preventing degradation. Since 90% of the project area is in private ownership, maximum effectiveness will be accomplished via cooperation with state, federal, tribal, and private entities. The project addresses goals and objectives presented in the Klickitat Subbasin Summary and the 1994 NWPPC Fish and Wildlife Program. Feedback from the 2000 Provincial Review process indicated a need for better information management to aid development of geographic priorities. Thus, an emphasis has been placed on database development and a review of existing information prior to pursuing more extensive implementation. Planning and design was initiated on several restoration projects. These priorities will be refined in future reports as the additional data is collected and analyzed. Tasks listed are for the April 1, 2001 to August 31, 2002 contract cycle, for which work was delayed during the summer of 2001 because the contract was not finalized until mid-August 2001. Accomplishments are provided for the September 1, 2001 to August 31, 2002 reporting period. During this reporting period

  13. The NASA Seasonal-to-Interannual Prediction Project (NSIPP). [Annual Report for 2000

    NASA Technical Reports Server (NTRS)

    Rienecker, Michele; Suarez, Max; Adamec, David; Koster, Randal; Schubert, Siegfried; Hansen, James; Koblinsky, Chester (Technical Monitor)

    2001-01-01

    The goal of the project is to develop an assimilation and forecast system based on a coupled atmosphere-ocean-land-surface-sea-ice model capable of using a combination of satellite and in situ data sources to improve the prediction of ENSO and other major S-I signals and their global teleconnections. The objectives of this annual report are to: (1) demonstrate the utility of satellite data, especially surface height surface winds, air-sea fluxes and soil moisture, in a coupled model prediction system; and (2) aid in the design of the observing system for short-term climate prediction by conducting OSSE's and predictability studies.

  14. Spring Chinook Salmon Oncorhynchus tshawytscha Supplementation in the Clearwater Subbasin ; Nez Perce Tribal Hatchery Monitoring and Evaluation Project, 2007 Annual Report.

    SciTech Connect

    Backman, Thomas; Sprague, Sherman; Bretz, Justin

    2009-06-10

    The Nez Perce Tribal Hatchery (NPTH) program has the following goals (BPA, et al., 1997): (1) Protect, mitigate, and enhance Clearwater Subbasin anadromous fish resources; (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater Subbasin; (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project initiation; (4) Sustain long-term fitness and genetic integrity of targeted fish populations; (5) Keep ecological and genetic impacts to non-target populations within acceptable limits; and (6) Promote Nez Perce Tribal management of Nez Perce Tribal Hatchery Facilities and production areas within Nez Perce Treaty lands. The NPTH program was designed to rear and release 1.4 million fall and 625,000 spring Chinook salmon. Construction of the central incubation and rearing facility NPTH and spring Chinook salmon acclimation facilities were completed in 2003 and the first full term NPTH releases occurred in 2004 (Brood Year 03). Monitoring and evaluation plans (Steward, 1996; Hesse and Cramer, 2000) were established to determine whether the Nez Perce Tribal Hatchery program is achieving its stated goals. The monitoring and evaluation action plan identifies the need for annual data collection and annual reporting. In addition, recurring 5-year program reviews will evaluate emerging trends and aid in the determination of the effectiveness of the NPTH program with recommendations to improve the program's implementation. This report covers the Migratory Year (MY) 2007 period of the NPTH Monitoring & Evaluation (M&E) program. There are three NPTH spring Chinook salmon treatment streams: Lolo Creek, Newsome Creek, and Meadow Creek. In 2007, Lolo Creek received 140,284 Brood Year (BY) 2006 acclimated pre-smolts at an average weight of 34.9 grams per fish, Newsome Creek received 77,317 BY 2006 acclimated pre-smolts at an average of 24.9 grams

  15. Lake Roosevelt White Sturgeon Recovery Project : Annual Progress Report, January 2003 – March 2004.

    SciTech Connect

    Howell, Matthew D.; McLellan, Jason G.

    2009-07-15

    motivated movements. In August 2003, three Vemco VR2 fixed station acoustic receivers, supplied by the UCWSRI Transboundary Telemetry Project, were deployed in the vicinities of Kettle Falls Bridge, Marcus Island, and Northport, WA. Data downloaded from these receivers through December 2003 confirmed the findings of a previous telemetry study that the Marcus area is an important overwintering habitat for white sturgeon. On 18 February 2004, juvenile white sturgeon (n=2,000) were transported from Kootenay Sturgeon Hatchery in British Columbia to WDFW Columbia Basin Hatchery (CBH) in Moses Lake, WA. Fish were reared at CBH to approximately 30 g and individually outfitted with PIT tags and scute marked. On 11 May 2004, fish were released into Lake Roosevelt in the vicinities of Kettle Falls Bridge, North Gorge, and Northport.

  16. Moses Lake Fishery Restoration Project; Factors Affecting the Recreational Fishery in Moses Lake Washington, Annual Report 2002-2003.

    SciTech Connect

    Burgess, Dave

    2003-11-01

    This annual report is a precursor to the final technical report we will be writing the next contract period. Consequently, this report, covering the period between September 27, 2002, and September 26, 2003, represents a progress report towards the final technical report we anticipate completing by September 26, 2004. Sample analysis and field work have progressed well and we anticipate no further delays. There are 4 objectives: (1) To quantify secondary production Moses Lake; (2) To quantify the influence of predation on target fishes in Moses Lake; (3) To quantify mortality of selected fished in Moses Lake; and (4) To assess effects of habitat changes from shoreline development and carp on the fish community in Moses Lake.

  17. Project Catch: A space based solution to combat illegal, unreported and unregulated fishing. Part I: Vessel monitoring system

    NASA Astrophysics Data System (ADS)

    Detsis, Emmanouil; Brodsky, Yuval; Knudtson, Peter; Cuba, Manuel; Fuqua, Heidi; Szalai, Bianca

    2012-11-01

    Space assets have a unique opportunity to play a more active role in global resource management. There is a clear need to develop resource management tools in a global framework. Illegal, Unregulated and Unreported (IUU) fishing is placing pressure on the health and size of fishing stocks around the world. Earth observation systems can provide fishery management organizations with cost effective monitoring of large swaths of ocean. Project Catch is a fisheries management project based upon the complimentary, but independent Catch-VMS and Catch-GIS systems. Catch-VMS is a Vessel Monitoring System with increased fidelity over existing offerings. Catch-GIS is a Geographical Information System that combines VMS information with existing Earth Observation data and other data sources to identify Illegal, Unregulated and Unreported (IUU) fishing. Project Catch was undertaken by 19 Masters students from the 2010 class of the International Space University. In this paper, the space-based system architecture of Project Catch is presented and analyzed. The rationale for the creation of the system, as well as the engineering trade-off studies in its creation, are discussed. The Catch-VMS proposal was envisaged in order to address two specific problems: (1) the expansion of illegal fishing to high-latitude regions where existing satellite systems coverage is an issue and (2) the lack of coverage in remote oceanic regions due to reliance on coastal-based monitoring. Catch-VMS utilizes ship-borne transponders and hosted-payload receivers on a Global Navigation Satellite System in order to monitor the position and activity of compliant fishing vessels. Coverage is global and continuous with multiple satellites in view providing positional verification through multilateration techniques. The second part of the paper briefly describes the Catch-GIS system and investigates its cost of implementation.

  18. Spring Chinook Salmon Production for Confederated Tribes of the Umatilla Indian Reservation, Little White Salmon National Fish Hatchery, Annual Report 2006.

    SciTech Connect

    Doulas, Speros

    2007-01-01

    This annual report covers the period from January 1, 2006 through December 31, 2006. Work completed supports the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) effort to restore a locally-adapted stock of spring Chinook to the Umatilla River Basin. During the year, staff at the Little White Salmon/Willard National Fish Hatchery Complex have completed the rearing of 218,764 Brood Year 2004 spring Chinook salmon for release into the Umatilla River during spring 2006 and initiated production of approximately 220,000 Brood Year 2005 spring Chinook for transfer and release into the Umatilla River during spring 2007. All work under this contract is performed at the Little White Salmon and Willard National Fish Hatcheries (NFH), Cook, WA.

  19. 2005 Annual Synthesis Report, Pallid Sturgeon Population Assessment Program and Associated Fish Community Monitoring for the Missouri River

    SciTech Connect

    Oldenburg, Eric W.; Hanrahan, Timothy P.; Harnish, Ryan A.; Bellgraph, Brian J.; Duncan, Joanne P.; Allwardt, Craig H.

    2008-08-12

    Pallid sturgeon, Scaphirhynchus albus, have declined throughout the Missouri River since dam construction and inception of the Bank Stabilization and Navigation Project in 1912. Their decline likely is due to the loss and degradation of their natural habitat as a result of changes in the river’s structure and function, as well as the pallid sturgeon’s inability to adapt to these changes. The U. S. Army Corps of Engineers has been working with state and federal agencies to develop and conduct a Pallid Sturgeon Monitoring and Assessment Program (Program), with the goal of recovering pallid sturgeon populations. The Program has organized the monitoring and assessment efforts into distinct geographic segments, with state and federal resource management agencies possessing primary responsibility for one or more segment. To date, the results from annual monitoring have been reported for individual Program segments. However, monitoring results have not been summarized or evaluated for larger spatial scales, encompassing more than one Program segment. This report describes a summary conducted by the Pacific Northwest National Laboratory (PNNL) that synthesizes the 2005 sampling year monitoring results from individual segments.

  20. 2006 Annual Synthesis Report, Pallid Sturgeon Population Assessment Program and Associated Fish Community Monitoring for the Missouri River

    SciTech Connect

    Oldenburg, Eric W.; Hanrahan, Timothy P.; Harnish, Ryan A.; Bellgraph, Brian J.; Duncan, Joanne P.; Allwardt, Craig H.

    2008-08-12

    Pallid sturgeon, Scaphirhynchus albus, have declined throughout the Missouri River since dam construction and inception of the Bank Stabilization and Navigation Project in 1912. Their decline likely is due to the loss and degradation of their natural habitat as a result of changes in the river’s structure and function, as well as the pallid sturgeon’s inability to adapt to these changes. The U. S. Army Corps of Engineers has been working with state and federal agencies to develop and conduct a Pallid Sturgeon Monitoring and Assessment Program (Program), with the goal of recovering pallid sturgeon populations. The Program has organized the monitoring and assessment efforts into distinct geographic segments, with state and federal resource management agencies possessing primary responsibility for one or more segment. To date, the results from annual monitoring have been reported for individual Program segments. However, monitoring results have not been summarized or evaluated for larger spatial scales, encompassing more than one Program segment. This report describes a summary conducted by the Pacific Northwest National Laboratory (PNNL) that synthesizes the 2006 sampling year monitoring results from individual segments.

  1. Pinon Pine Power Project. Annual report, January 1--December 31, 1996

    SciTech Connect

    1997-12-31

    This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company`s (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE`s Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Power Project will be constructed and operated at SPPCo`s Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit is designated as Tracy Unit No. 4.

  2. Annual Report 2007 Multi-state research project on "Irrigation Management for Humid and Sub-Humid Areas" S1018.

    Technology Transfer Automated Retrieval System (TEKTRAN)

    This report summarizes the annual results from scientists at the Application and Production Technology Research Unit in Stoneville, as members of the multi-state research project on irrigation and water management S1018. The multi-state research project has four key objectives, three of which the St...

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    SciTech Connect

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Klenk, David P.

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    SciTech Connect

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    SciTech Connect

    West Valley Environmental Services LLC and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  8. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    SciTech Connect

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner, II, Robert E.; Fox, James R.; Hoch, Jerald J.; Werchowski, Rebecca L.

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  9. Effects of Habitat Enhancement on Steelhead Trout and Coho Salmon Smolt Production, Habitat Utilization, and Habitat Availability in Fish Creek, Oregon, 1986 Annual Report.

    SciTech Connect

    Everest, Fred H.; Reeves, Gordon H.; Hohler, David B.

    1987-06-01

    Construction and evaluation of salmonid habitat improvements on Fish Creek, a tributary of the upper Clackamas River, was continued in fiscal year 1986 by the Estacada Ranger District, Mt. Hood National Forest, and the Anadromous Fish Habitat Research Unit of the Pacific Northwest Research Station (PNW), USDA Forest Service. The study began in 1982 when PNW entered into an agreement with the Mt. Hood National Forest to evaluate fish habitat improvements in the Fish Creek basin on the Estacada Ranger District. The project was initially conceived as a 5-year effort (1982-1986) to be financed with Forest Service funds. The habitat improvement program and the evaluation of improvements were both expanded in mid-1983 when the Bonneville Power Administration (BPA) entered into an agreement with the Mt. Hood National Forest to cooperatively fund work on Fish Creek. Habitat improvement work in the basin is guided by the Fish Creek Habitat Rehabilitation-Enhancement Framework developed cooperatively by the Estacada Ranger District, the Oregon Department of Fish and Wildlife, and the Pacific Northwest Research Station (see Appendix 2). The framework examines potential factors limiting production of salmonids in the basin, and the appropriate habitat improvement measures needed to address the limiting factors. Habitat improvement work in the basin has been designed to: (1) improve quantity, quality, and distribution of spawning habitat for coho and spring chinook salmon and steelhead trout, (2) increase low flow rearing habitat for steelhead trout and coho salmon, (3) improve overwintering habitat for coho salmon and steelhead trout, (4) rehabilitate riparian vegetation to improve stream shading to benefit all species, and (5) evaluate improvement projects from a drainage wide perspective. The objectives of the evaluation include: (1) Drainage-wide evaluation and quantification of changes in salmonid spawning and rearing habitat resulting from a variety of habitat

  10. Environmental mitigation at hydroelectric projects: Volume 1. Current practices for instream flow needs, dissolved oxygen, and fish passage

    SciTech Connect

    Sale, M. J.; Cada, G. F.; Chang, L. H.; Christensen, S. W.; Railsback, S. F.; Francfort, J. E.; Rinehart, B. N.; Sommers, G. L.

    1991-12-01

    The first report of the Environmental Study examines current mitigation practices for water quality [specifically, dissolved oxygen (DO)], instream flows, and upstream and downstream fish passage. This review describes information on the types and frequency of mitigations methods in use, their environmental benefits and effectiveness, and their environmental benefits and effectiveness, and their costs. Information on mitigation practices was obtained directly from three sources: (a) existing records from the Federal Energy Regulatory Commission (FERC), (b) new information provided by nonfederal hydropower developers, and (c) new information obtained from the state and federal natural resource agencies involved in hydropower regulation. Information on specific mitigation practices was obtained from 280 projects, more than 40% of all the projects licensed during the 1980s that were identified a priori as having the mitigation requirements of interest. Of all projects receiving FERC licenses or license exemptions since 1980, instream flow requirements are the most common mitigation requirement, followed by requirements for downstream fish passage, DO protection, and upstream fish passage facilities. The proportion of projects with environmental mitigation requirements has increased significantly during the past decade.

  11. Lake Roosevelt Rainbow Trout : Habitat/Passage Improvement Project Annual Report 2000.

    SciTech Connect

    Sear, Sheri

    2001-02-01

    Lake Franklin D. Roosevelt was created with the completion of the Grand Coulee Dam in 1942. The lake stretches 151 miles up-stream to the International border between the United States and Canada at the 49th parallel. Increased recreational use, subsistence and sport fishing has resulted in intense interest and possible exploitation of the resources within the lake. Previous studies of the lake and its fishery have been limited. Early studies indicate that natural reproduction within the lake and tributaries are not sufficient to support a rainbow trout (Onchoryhnchus mykiss) fishery (Scholz et. al., 1988). These studies indicate that the rainbow trout population may be limited by lack of suitable habitat for spawning and rearing (Scholz et. al., 1988). The initial phase of this project (Phase I, baseline data collection- 1990-91) was directed at the assessment of limiting factors such as quality and quantity of available spawning gravel, identification of passage barriers, and assessment of other limiting factors. Population estimates were conducted using the Seber/LeCren removal/depletion method. After the initial assessment of stream parameters, several streams were selected for habitat/passage improvement projects (Phase II, implementation-1992-96). At the completion of project habitat improvements, the final phase (Phase III, monitoring) began. This phase will assess changes and gauge the success achieved through the improvements. The objective of the project is to correct passage barriers and improve habitat conditions of selected tributaries to Lake Roosevelt for adfluvial rainbow trout that utilize tributary streams for spawning and rearing. Streams with restorable habitats were selected for improvements. Completion of improvement efforts should increase the adfluvial rainbow trout contribution to the resident fishery in Lake Roosevelt. Three co-operating agencies, the Confederated Tribes of the Colville Reservation (CCT), the Spokane Tribe of Indians (STI

  12. Lake Roosevelt Rainbow Trout : Habitat/Passage Improvement Project Annual Report 1999.

    SciTech Connect

    Jones, Charles D.

    2000-02-01

    Lake Franklin D. Roosevelt was created with the completion of the Grand Coulee Dam in 1942. The lake stretches 151 miles up-stream to the International border between the United States and Canada at the 49th parallel. Increased recreational use, subsistence and sport fishing has resulted in intense interest and possible exploitation of the resources within the lake. Previous studies of the lake and its fishery have been limited. Early studies indicate that natural reproduction within the lake and tributaries are not sufficient to support a rainbow trout (Onchoryhnchus mykiss) fishery (Scholz et. al., 1988). These studies indicate that the rainbow trout population may be limited by lack of suitable habitat for spawning and rearing (Scholz et. al., 1988). The initial phase of this project (Phase I, baseline data collection- 1990-91) was directed at the assessment of limiting factors such as quality and quantity of available spawning gravel, identification of passage barriers, and assessment of other limiting factors. Population estimates were conducted using the Seber/LeCren removal/depletion method. After the initial assessment of stream parameters, several streams were selected for habitat/passage improvement projects (Phase II, implementation-1992-96). At the completion of project habitat improvements, the final phase (Phase III, monitoring) began. This phase will assess changes and gauge the success achieved through the improvements. The objective of the project is to correct passage barriers and improve habitat conditions of selected tributaries to Lake Roosevelt for adfluvial rainbow trout that utilize tributary streams for spawning and rearing. Streams with restorable habitats were selected for improvements. Completion of improvement efforts should increase the adfluvial rainbow trout contribution to the resident fishery in Lake Roosevelt. Three co-operating agencies, the Confederated Tribes of the Colville Reservation (CCT), the Spokane Tribe of Indians (STI

  13. Lake Roosevelt Rainbow Trout : Habitat/Passage Improvement Project : Annual Report 1998.

    SciTech Connect

    Jones, Charles D.

    1999-02-01

    Lake Franklin D. Roosevelt was created with the completion of the Grand Coulee Dam in 1942. The lake stretches 151 miles up-stream to the International border between the United States and Canada at the 49th parallel. Increased recreational use, subsistence and sport fishing has resulted in intense interest and possible exploitation of the resources within the lake. Previous studies of the lake and its fishery have been limited. Early studies indicate that natural reproduction within the lake and tributaries are not sufficient to support a rainbow trout (Onchoryhnchus mykiss) fishery (Scholz et. al., 1988). These studies indicate that the rainbow trout population may be limited by lack of suitable habitat for spawning and rearing (Scholz et. al., 1988). The initial phase of this project (Phase I, baseline data collection) was directed at the assessment of limiting factors such as quality and quantity of available spawning gravel, identification of passage barriers, and assessment of other limiting factors. Population estimates were conducted using the Seber/LeCren removal/depletion method. After the initial assessment of stream parameters, several streams were selected for habitat/passage improvement projects (Phase II, implementation). At the completion of project habitat improvements, the final phase (Phase III, monitoring) began. This phase will assess changes and gauge the success achieved through the improvements. The objective of the project is to correct passage barriers and improve habitat conditions of selected tributaries to Lake Roosevelt for adfluvial rainbow trout that utilize tributary streams for spawning and rearing. Streams with restorable habitats were selected for improvements. Completion of improvement efforts should increase the adfluvial rainbow trout contribution to the resident fishery in Lake Roosevelt. Personnel of three co-operating agencies, the Confederated Tribes of the Colville Reservation (CCT), the Spokane Tribe of Indians (STI) and

  14. Blast furnace granular coal injection project. Annual report, January--December 1995

    SciTech Connect

    1995-05-01

    This annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to employ British Steel technology that uses granular coal to provide part of the fuel requirement of blast furnaces. The project will demonstrate/assess a broad range of technical/economic issues associated with the use of coal for this purpose. To achieve the program objectives, the demonstration project is divided into the following three Phases: (1) Phase I - Design. (2) Phase II - Construction. (3) Phase III - Operation. Preliminary Design (Phase I) began in 1991 with detailed design commencing in 1993. Construction at Burns Harbor (Phase II) began in August 1993 and was completed at the end of 1994. The demonstration test program (Phase III) started in the fourth quarter of 1995.

  15. Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1993

    SciTech Connect

    Not Available

    1994-02-01

    This report presents the annual hydrogeologic evaluation of 20 Resource Conservation and Recovery Act of 1976 groundwater monitoring projects and 1 nonhazardous waste facility at the US Department of Energy`s Hanford Site. Most of the projects no longer receive dangerous waste; a few projects continue to receive dangerous waste constituents for treatment, storage, or disposal. The 20 RCRA projects comprise 30 waste management units. Ten of the units are monitored under groundwater quality assessment status because of elevated levels of indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration, distribution, and rate of migration are evaluated. Groundwater is monitored at the other 20 units to detect contamination, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1992 and September 1993. Recent groundwater quality is also described for the 100, 200, 300, and 600 Areas and for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

  16. Kootenai River Fisheries Investigation : Stock Status of Burbot : Project Progress Report 2008 Annual Report.

    SciTech Connect

    Paragamian, Valughn L.; Laude Dorothy C.

    2008-12-26

    Objectives of this investigation were to (1) monitor the population status and recruitment of burbot Lota lota in the Kootenai River, Idaho and British Columbia, Canada during the winter of 2006-2007; (2) evaluate the selective withdrawal system in place at Libby Dam to maintain the river temperature near Bonners Ferry between 1-4 C (November-December) to improve burbot migration and spawning activity; and (3) determine if a hatching success of 10% of eyed burbot embryos could be achieved through extensive rearing and produce fingerlings averaging 9.8 cm in six months. Water temperature did not fall below the upper limit (4 C) until mid-January but was usually maintained between 1-4 C January through February and was acceptable. Snowpack was characterized by a 101% of normal January runoff forecast. Adult burbot were sampled with hoop nets and slat traps. Only three burbot were captured in hoop nets, all at Ambush Rock (rkm 244.5). No burbot were caught in either slat traps or juvenile sampling gear, indicating the population is nearly extirpated. Burbot catch per unit effort in hoop nets was 0.003 fish/net d. Extensive rearing was moved to a smaller private pond and will be reported in the 2008-2009 annual report.

  17. Velocity Measurements at Six Fish Screening Facilities in the Yakima River Basin, Washington, Summer 1988 : Annual Report.

    SciTech Connect

    Abernethy, C. Scott; Neitzel, Duane A.; Lusty, E. William

    1989-11-01

    The Bonneville Power Administration (BPA), the United States Bureau of Reclamation (USSR), and the Washington State Department of Ecology (WDOE) are funding the construction and evaluation of fish passage facilities and fish protection facilities at irrigation and hydroelectric diversions in the Yakima River Basin, Washington State. The program provides offsite enhancement to compensate for fish and wildlife losses caused by hydroelectric development throughout the Columbia River Basin, and addresses natural propagation of salmon to help mitigate the impact of irrigation in the Yakima River Basin. This report evaluates the flow characteristics of the screening facilities. Studies consisted of velocity measurements taken in front of the rotary drum screens and within the fish bypass systems during peak flows. Measurements of approach velocity and sweep velocity were emphasized in these studies; however, vertical velocity was also measured. 5 refs., 18 figs., 15 tabs.

  18. Pit-Tag Studies with Juvenile Salmonids at the Chandler Canal Fish Collection Facility, Yakima River : Annual Report 1990.

    SciTech Connect

    Ruehle, Thomas E.; McCutcheon, Clinton Scott

    1994-09-01

    Juvenile salmonid survival studies planned for the Yakima Basin will require the release and recapture of large numbers of marked fish. Before these studies can be implemented, information is needed about potential recovery rates of marked fish at proposed sampling sites. The type of mark employed and the efficiency of the equipment used to capture and examine fish for marks must be evaluated since accurate survival estimates depend on their reliability. Recovery rates are expected to vary with species and life stage as well as environmental factors such as river flow and water temperature. The purpose of this study was to assess the mark-recovery capabilities of the Chandler facility and a mobile juvenile fish trap installed temporarily at West Richland, Washington near the mouth of the Yakima River.

  19. Projected increases in the annual flood pulse of the western Amazon

    NASA Astrophysics Data System (ADS)

    Zulkafli, Zed; Buytaert, Wouter; Manz, Bastian; Veliz Rosas, Claudia; Willems, Patrick; Lavado-Casimiro, Waldo; Guyot, Jean-Loup; Santini, William

    2016-04-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research due to its rich biodiversity and the significant role of rain forest in carbon cycling. Climate change has also direct hydrological impact, and there have been increasing efforts to understand such dynamics at continental and subregional scales such as the scale of the western Amazon. New projections from the Coupled Model Inter- comparison Project Phase 5 (CMIP5) ensemble indicate consistent climatic warming and increasing seasonality of precipitation in the Peruvian Amazon basin. Here we use a distributed land surface model to quantify the potential impact of this change in the climate on the hydrological regime of the river. Using extremes value analysis, historical and future projections of the annual minimum, mean, and maximum river flows are produced for a range of return periods between 1 and 100 years. We show that the RCP 4.5 and 8.5 scenarios of climate change project an increased severity of the wet season flood pulse (7.5% and 12% increases respectively for the 100- year return floods). These findings are in agreement with previously projected increases in high extremes under the Special Report on Emissions Scenarios (SRES) climate projections, and are important to highlight due to the potential consequences on reproductive processes of in-stream species, swamp forest ecology, and socio-economy in the floodplain, amid a growing literature that more strongly emphasises future droughts and their impact on the viability of the rain forest system over the greater Amazonia.

  20. Use of a Fish Transportation Barge for Increasing Returns of Steelhead Imprinted for Homing, 1983 Annual Report.

    SciTech Connect

    Harmon, Jerrel R.

    1984-03-01

    A study was conducted to determine if transporting steelhead, Salmo gairdneri, smolts by barge from Dworshak National Fish Hatchery to a release site in the Columbia River below Bonneville Dam would result in increased returns of adults to the fishery and hatchery. Eight separately identifiable groups of about 30,000 steelhead each were marked and released in 1982. During 1983, over 251,000 smolts were marked - about 30,000 fish for each of four test lots (barged) and four control lots (released into the Clearwater River near the hatchery). The health and status of smoltification of the juvenile fish were monitored from March to the release date for each group. The fish sampled were considered to be in good health and well advanced in smoltification at release. Fish from the control release were recovered at dams and in the estuary along their migration route. Approximately 29% of the fish from the control release were transported from collector dams (Lower Granite, Little Goose, and McNary) as part of the routine transportation program. The relatively large number of 1-ocean age adult steelhead (179) recovered at adult collector dams (Lower Granite, McNary, and Bonneville) and in the Indian fishery (Columbia River Zone 6) indicates a high survival of steelhead released as smolts in the spring of 1982. A large return of 2-ocean age adults is expected in 1984. 3 refs.

  1. It is the economy, stupid! Projecting the fate of fish populations using ecological-economic modeling.

    PubMed

    Quaas, Martin F; Reusch, Thorsten B H; Schmidt, Jörn O; Tahvonen, Olli; Voss, Rudi

    2016-01-01

    Four marine fish species are among the most important on the world market: cod, salmon, tuna, and sea bass. While the supply of North American and European markets for two of these species - Atlantic salmon and European sea bass - mainly comes from fish farming, Atlantic cod and tunas are mainly caught from wild stocks. We address the question what will be the status of these wild stocks in the midterm future, in the year 2048, to be specific. Whereas the effects of climate change and ecological driving forces on fish stocks have already gained much attention, our prime interest is in studying the effects of changing economic drivers, as well as the impact of variable management effectiveness. Using a process-based ecological-economic multispecies optimization model, we assess the future stock status under different scenarios of change. We simulate (i) technological progress in fishing, (ii) increasing demand for fish, and (iii) increasing supply of farmed fish, as well as the interplay of these driving forces under different scenarios of (limited) fishery management effectiveness. We find that economic change has a substantial effect on fish populations. Increasing aquaculture production can dampen the fishing pressure on wild stocks, but this effect is likely to be overwhelmed by increasing demand and technological progress, both increasing fishing pressure. The only solution to avoid collapse of the majority of stocks is institutional change to improve management effectiveness significantly above the current state. We conclude that full recognition of economic drivers of change will be needed to successfully develop an integrated ecosystem management and to sustain the wild fish stocks until 2048 and beyond. PMID:26348787

  2. New Concepts in Fish Ladder Design, Part I of IV, Summary Report, 1982-1984 Final Project Report.

    SciTech Connect

    Orsborn, John F.

    1985-08-01

    The report looks at the most active periods of fishway research since 1938 as background for a project to apply fundamental fluid and bio-mechanics to fishway design, and develop more cost effective fish passage facilities with primary application to small scale hydropower facilities. Also discussed are new concepts in fishway design, an assessment of fishway development and design, and an analysis of barriers to upstream migration. (ACR)

  3. Snake River Sockeye Salmon Captive Broodstock Program, Research Element : Project Progress Report, 2000 Annual Report.

    SciTech Connect

    Hebdon, J. Lance; Castillo, Jason; Kline, Paul A.

    2002-08-01

    On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes and Idaho Department of Fish and Game initiated the Snake River Sockeye Salmon Sawtooth Valley Project to conserve and rebuild populations in Idaho. Restoration efforts are focusing on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced juvenile sockeye salmon from the captive broodstock program occurred in 1994. The first anadromous adult returns from the captive broodstock program were recorded in 1999 when six jacks and one jill were captured at Idaho Department of Fish and Game's Sawtooth Fish Hatchery. In 2000, progeny from the captive broodstock program were released using four strategies: eyed-eggs were placed in Pettit Lake; age-0 presmolts were released to all three lakes in October; age-1 smolts were released to Redfish Lake Creek, and hatchery-produced adult sockeye salmon were released to Redfish and Alturas lakes for volitional spawning in September. Anadromous adult sockeye salmon were released to all three lakes. Total kokanee abundance in Redfish Lake was estimated at 10,268, which was the lowest abundance since 1991. Abundance of kokanee in Alturas Lake was estimated at 125,462, which was one of the highest values recorded since 1991. Abundance of kokanee in Pettit Lake was estimated at 40,599, which is the third highest value recorded since 1991. Upon the recommendation of the Stanley Basin Sockeye Technical Oversight Committee, the National Marine Fisheries Service reopened the kokanee fishery on Redfish Lake in 1995 in an attempt to reduce kokanee numbers. Anglers fished an estimated 3,063 hours and harvested approximately 67 kokanee during the 2000 season. Angler effort and harvest were also monitored on Alturas Lake during 2000. Effort on Alturas Lake was 5,190 hours, and harvest of kokanee

  4. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 3 of 7, 2003-2004 Annual Report.

    SciTech Connect

    Knudsen, Curtis

    2004-05-01

    This is the third in a series of annual reports that address reproductive ecological research and comparisons of hatchery and wild origin spring chinook in the Yakima River basin. Data have been collected prior to supplementation to characterize the baseline reproductive ecology, demographics and phenotypic traits of the unsupplemented upper Yakima population, however this report focuses on data collected on hatchery and wild spring chinook returning in 2003; the third year of hatchery adult returns. This report is organized into three chapters, with a general introduction preceding the first chapter and summarizes data collected between April 1, 2003 and March 31, 2004 in the Yakima basin. Summaries of each of the chapters in this report are included below. A major component of determining supplementation success in the Yakima Klickitat Fishery Project's spring chinook (Oncorhynchus tshawytscha) program is an increase in natural production. Within this context, comparing upper Yakima River hatchery and wild origin fish across traits such as sex ratio, age composition, size-at-age, fecundity, run timing and gamete quality is important because these traits directly affect population productivity and individual fish fitness which determine a population's productivity.

  5. White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume I..

    SciTech Connect

    Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest

    1985-06-01

    Studies were conducted to describe current habitat conditions in the White River basin above White River Falls and to evaluate the potential to produce anadromous fish. An inventory of spawning and rearing habitats, irrigation diversions, and enhancement opportunities for anadromous fish in the White River drainage was conducted. Survival of juvenile fish at White River Falls was estimated by releasing juvenile chinook and steelhead above the falls during high and low flow periods and recapturing them below the falls in 1983 and 1984. Four alternatives to provide upstream passage for adult salmon and steelhead were developed to a predesign level. The cost of adult passage and the estimated run size of anadromous fish were used to determine the benefit/cost ratio of the preferred alternative. Possible effects of the introduction of anadromous fish on resident fish and on nearby Oak Springs Hatchery were evaluated. This included an inventory of resident species, a genetic study of native rainbow, and the identification of fish diseases in the basin. 28 figs., 23 tabs.

  6. Oily Fish Intake and Cognitive Performance in Community-Dwelling Older Adults: The Atahualpa Project.

    PubMed

    Del Brutto, Oscar H; Mera, Robertino M; Gillman, Jennifer; Zambrano, Mauricio; Ha, Jung-eun

    2016-02-01

    Due to their high content of omega-3 polyunsaturated fatty acids, oily fish consumption is likely associated with a better cognitive performance. However, information on this association is controversial, with some studies showing a positive effect while others showing no association. We aimed to assess the effects of oily fish consumption on cognitive performance in a population of frequent fish consumers living in rural coastal Ecuador. Atahualpa residents aged ≥60 years were identified during a door-to-door survey and evaluated by the use of the Montreal Cognitive Assessment (MoCA). Oily fish servings per week were calculated in all participants. We estimated whether fish intake correlated with MoCA scores in generalized multivariate linear models adjusted for demographics, cardiovascular risk factors, edentulism and symptoms of depression. Out of 330 eligible persons, 307 (93%) were enrolled. Mean MoCA scores were 19 ± 4.8 points, and mean oily fish consumption was 8.6 ± 5.3 servings per week. In multivariate analyses, MoCA scores were related to fish servings (β 0.097, 95% CI 0.005-0.188, p = 0.038). Locally weighted scatterplot smoothing showed an inflection point in the total MoCA score curve at four fish servings per week. However, predictive margins of the MoCA score were similar across groups below and above this point, suggesting a direct linear relationship between oily fish intake and cognitive performance. Simple preventive measures, such as modifying dietary habits might be of value to reduce the rate of cognitive decline in community-dwelling older adults living in underserved populations. PMID:26187093

  7. Designer Fish.

    ERIC Educational Resources Information Center

    Hall, William R., Jr.

    1990-01-01

    Described is an activity in which students are asked to design a fish that would survive in a natural system. A project to computerize the activity is discussed. The development of this artificial intelligence software is detailed. (CW)

  8. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2006

    SciTech Connect

    Johnson, Gary E.; Borde, Amy B.; Dawley, Earl; Diefenderfer, Heida L.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Thom, Ronald M.; Vavrinec, John; Whiting, Allan H.

    2007-12-06

    This report is the third annual report of a six-year project to evaluate the cumulative effects of habitat restoration action in the Columbia River Estuary (CRE). The project is being conducted for the U.S. Army Corps of Engineers (Corps) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory, the Pt. Adams Biological Field Station of the National Marine Fisheries Service, and the Columbia River Estuary Study Taskforce. Measurement of the cumulative effects of ecological restoration projects in the Columbia River estuary is a formidable task because of the size and complexity of the estuarine landscape and the meta-populations of salmonids in the Columbia River basin. Despite the challenges presented by this system, developing and implementing appropriate indicators and methods to measure cumulative effects is the best way to enable estuary managers to track the overall effectiveness of investments in estuarine restoration projects. This project is developing methods to quantify the cumulative effects of multiple restoration activities in the CRE. The overall objectives of the 2006 study were to continue to develop techniques to assess cumulative effects, refine the standard monitoring protocols, and initiate development of an adaptive management system for Corps of Engineers’ habitat restoration monitoring efforts in the CRE. (The adaptive management effort will be reported at a later date.) Field studies during 2006 were conducted in tidal freshwater at Kandoll Farm on the lower Grays River and tidal brackish water at Vera Slough on Youngs Bay. Within each of area, we sampled one natural reference site and one restoration site. We addressed the overall objectives with field work in 2006 that, coupled with previous field data, had specific objectives and resulted in some important findings that are summarized here by chapter in this report. Each chapter of the report contains data on particular monitored variables for pre- and post

  9. Status of downstream fish passage at hydroelectric projects in the northeast, USA

    USGS Publications Warehouse

    Odeh, Mufeed; Orvis, Curtis

    1997-01-01

    In the northeastern United States several guidance, protection, and conveyance methods have been employed to assist downstream migrating fish. Overlay racks, standard bar racks with close spacing, louvers, curtain walls, guide walls, netting, and other means have been used to guide and protect fish from entrainment. The design process of these facilities comprises consideration of various factors, including flow approach, attraction flow, guidance and protection devices, bypass location, conveyance mechanism, and plunge pool conditions. This paper presents the status of the design criteria for downstream fish passage facilities at hydroelectric sites in the northeast part of the United States. Examples of existing facilities are given.

  10. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    NASA Technical Reports Server (NTRS)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    SciTech Connect

    West Valley Environmental Services LLC and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  12. TRAC-MIP: Tropical Rain bands with an Annual cycle and Continent - Model Intercomparison Project.

    NASA Astrophysics Data System (ADS)

    Biasutti, Michela; Voigt, Aiko; Scheff, Jack; Zeppetello, Lucas Randall

    2016-04-01

    Understanding and modeling tropical rainfall has proven to be one of the most stubborn challenges in climate science. Tropical rainfall biases such as a double inter-tropical convergence zone (ITCZ) in the East Pacific have now persisted more than two decades despite the general improvements of climate models, and projections for the ITCZ and the monsoon systems remain uncertain in magnitude and sign. Progress in these areas can be fostered by a set of idealized experiments that target the dynamics of tropical rain band, as long as these simple experiments are properly integrated within a full hierarchy of model simulations. To this aim, we have designed the "Tropical Rain belts with an Annual cycle and Continent - Model Intercomparison Project." TRAC-MIP involves five experiments using idealized aquaplanet and land setups to explore the dynamics of tropical rainfall. By using interactive sea-surface temperatures and seasonally-varying insolation TRAC-MIP fills the gap between idealized aquaplanet simulations with prescribed SSTs and the fully-coupled realistic model simulations of CMIP5. TRAC-MIP includes the participation of 13 state-of-the art comprehensive climate models, and it also includes a simplified model that neglects cloud and water-vapor radiative feedbacks, thus allowing a more direct connection between the results from the TRAC-MIP comprehensive models and the theoretical studies of tropical rain belt dynamics. We will present preliminary results from the ensemble, aiming to examine the mechanisms controlling tropical precipitation in the context of forced variability. First and foremost, we are interested in the largest forced variation: the annual cycle. Second, we are interested in the response to key forcings of the future (greenhouse gases) and of the Holocene (insolation). We will draw out the similarities and the distinctions between oceanic and continental rain bands, study the ways in which the two interact with each other, and investigate

  13. Augmented Fish Health Monitoring; Volume II of II, Completion Report.

    SciTech Connect

    Michak, Patty

    1991-12-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Participating agencies included: Washington Department of Fisheries (WDF), Oregon Department of Fish and Wildlife, Idaho Department of Fish and Game, and the US Fish and Wildlife Service (USFWS). This is the final data report for the Augmented Fish Health Monitoring project. Data collected and sampling results for 1990 and 1991 are presented within this report. An evaluation of this project can be found in Augmented Fish Health Monitoring, Volume 1, Completion Report.'' May, 1991. Pathogen detection methods remained the same from methods described in Augmented Fish Health Monitoring, Annual Report 1989,'' May, 1990. From January 1, 1990 to June 30, 1991 fish health monitoring sampling was conducted. In 1990 21 returning adult stocks were sampled. Juvenile pre-release exams were completed on 20 yearling releases, and 13 sub-yearling releases in 1990. In 1991 17 yearling releases and 11 sub-yearling releases were examined. Midterm sampling was completed on 19 stocks in 1990. Organosomatic analysis was performed at release on index station stocks; Cowlitz spring and fall chinook, Lewis river early coho and Lyons Ferry fall chinook.

  14. Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed; Anadromous Fish Habitat Restoration in the Nichols Canyon Subwatershed, 1999 Annual Report.

    SciTech Connect

    Koziol, Deb

    2000-02-01

    Nez Perce Soil & Water Conservation District (NPSWCD) undertook the Nichols Canyon Subwatershed Steelhead Trout Habitat Improvement Project in the spring of 1999. This Project is funded through a grant provided by the Bonneville Power Administration. The Project's purpose is to install and implement agricultural best management practices (BMPs) and riparian restorations to improve steelhead trout spawning and rearing habitat in the Nichols Canyon subwatershed of Big Canyon Creek. Improvements to spawning and rearing habitat in lower Big Canyon Creek tributaries will enhance natural production of the species in Big Canyon Creek and ultimately the Clearwater River. The following report is a summation of the activities undertaken by the NPSWCD in the first year of the project.

  15. Effects of Dissolved Gas Supersaturation on Fish Residing in the Snake and Columbia Rivers, 1996 Annual Report.

    SciTech Connect

    Schrank, Boyd P.

    1998-03-01

    Increased spill at dams has commonly brought dissolved gas supersaturation higher than levels established by state and federal water quality criteria in the Columbia and Snake Rivers. These increased spill volumes are intended to provide safe passage for migrating juvenile salmon. However, dissolved gas supersaturation resulting from spill in past decades has led to gas bubble disease (GBD) in fish. Therefore, during the period of high spill in 1996, the authors monitored the prevalence and severity of gas bubble disease by sampling resident fish in Priest Rapids Reservoir and downstream from Bonneville, Priest Rapids, and Ice Harbor Dams.

  16. Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.

    SciTech Connect

    Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.; Kline, Paul A.

    2008-12-17

    Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangered under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and

  17. Washington Phase II Fish Diversion Screen Evaluations in the Yakima and Touchet River Basins, 2005-2006 Annual Reports.

    SciTech Connect

    Chamness, Mickie; Abernethy, C.; Tunnicliffe, Cherylyn

    2006-02-01

    In 2005, Pacific Northwest National Laboratory (PNNL) researchers evaluated 25 Phase II fish screen sites in the Yakima and Touchet river basins. Pacific Northwest National Laboratory performs these evaluations for Bonneville Power Administration (BPA) to determine whether the fish screening devices meet National Marine Fisheries Service (NMFS) criteria to promote safe and timely fish passage. Evaluations consist of measuring velocities in front of the screens, using an underwater camera to look at the condition and environment in front of the screens, and noting the general condition and operation of the sites. Results of the evaluations in 2005 include the following: (1) Most approach velocities met the NMFS criterion of less than or equal to 0.4 fps. Less than 13% of all approach measurements exceeded the criterion, and these occurred at 10 of the sites. Flat-plate screens had more problems than drum screens with high approach velocities. (2) Bypass velocities generally were greater than sweep velocities, but sweep velocities often did not increase toward the bypass. The latter condition could slow migration of fish through the facility. (3) Screen and seal materials generally were in good condition. (4) Automated cleaning brushes generally functioned properly; chains and other moving parts were typically well-greased and operative. (5) Washington Department of Fish and Wildlife (WDFW) and U.S. Bureau of Reclamation (USBR) generally operate and maintain fish screen facilities in a way that provides safe passage for juvenile fish. (6) In some instances, irrigators responsible for specific maintenance at their sites (e.g., debris removal) are not performing their tasks in a way that provides optimum operation of the fish screen facility. New ways need to be found to encourage them to maintain their facilities properly. (7) We recommend placing datasheets providing up-to-date operating criteria and design flows in each sites logbox. The datasheet should include

  18. Blast furnace granular coal injection project. Annual report, January--December 1994

    SciTech Connect

    1995-07-01

    This annual report describes the Blast Furnace Granular Coal Injection project being implemented at Bethlehem Steel Corporation`s (BSC) Burns Harbor Plant. The project is receiving cost-sharing from the US Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to employ British Steel technology that uses granular coal to provide part of the fuel requirement of blast furnaces. The project will demonstrate/assess a broad range of technical/economic issues associated with the use of coal for this purpose. These include: coal grind size, coal injection rate, coal source (type) and blast furnace conversion method. To achieve the program objectives, the demonstration project is divided into the following three Phases: Phase I -- design; Phase II -- construction; and Phase III -- operation. Preliminary design (Phase I) began in 1991 with detailed design commencing in 1993. Construction at Burns Harbor (Phase II) began in August 1993 and was completed at the end of 1994. A 100% construction review meeting was held in December and attended by representatives of DOE, Fluor Daniel and Bethlehem Steel. The coal preparation mills were started up in December, 1994, and the first coal was injected into ``D`` blast furnace on December 19, 1994. Near the end of the year, the grinding mills and injection facility were being prepared for performance testing during the first quarter of 1995. The demonstration test program (phase III) will start in the fourth quarter of 1995.

  19. ENCOAL mild coal gasification demonstration project. Annual report, October 1994--September 1995

    SciTech Connect

    1996-01-01

    This document is the combination of the fourth quarter report (July - September 1995) and the 1995 annual report for the ENCOAL project. The following pages include the background and process description for the project, brief summaries of the accomplishments for the first three quarters, and a detailed fourth quarter report. Its purpose is to convey the accomplishments and current progress of the project. ENCOAL Corporation, a wholly-owned subsidiary of SMC Mining Company (formerly Shell Mining company, now owned by Zeigler Coal Holding Company), has completed the construction and start-up of a mild gasification demonstration plant at Triton Coal Company`s Buckskin Mine near Gillette, Wyoming. The process, using Liquids From Coal (LFC) technology developed by SMC and SGI International, utilizes low-sulfur Powder River Basis coal to produce two new fuels, Process Derived Fuel (PDF) and Coal Derived Liquids (CDL). The products, as alternative fuels sources, are expected to significantly lower current sulfur emissions at industrial and utility boiler sites throughout the nation, thereby reducing pollutants causing acid rain. In the LFC technology, coal is first deeply dried to remove water physically. The temperature is further raised in a second stage which results in decomposition reactions that form the new products. This chemical decomposition (mild gasification) creates gases by cracking reactions from the feed coal. The chemically altered solids are cooled and further processed to make PDF. The gases are cooled, condensing liquids as CDL, and the residual gases are burned in the process for heat. The process release for the ENCOAL plant predicted that one ton of feed coal would yield roughly {1/2} ton of PDF and {1/2} barrel of CDL. By varying plant running conditions, however, it has since been learned that the actual CDL recovery rate may be as much as 15% to 20% above the projections.

  20. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    SciTech Connect

    Knudsen, Curtis M.; Schroder, Steven L.; Johnston, Mark V.

    2005-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from Oncorh Consulting to the Washington Department of Fish and Wildlife (WDFW), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning and (2) summarize results of research that have broader scientific relevance. This is the fourth in a series of reports that address reproductive ecological research and monitoring of spring chinook populations in the Yakima River basin. This annual report summarizes data collected between April 1, 2004 and March 31, 2005 and includes analyses of historical baseline data, as well. Supplementation success in the Yakima Klickitat Fishery Project's (YKFP) spring chinook (Oncorhynchus tshawytscha) program is defined as increasing natural production and harvest opportunities, while keeping adverse ecological interactions and genetic impacts within acceptable bounds (Busack et al. 1997). Within this context demographics, phenotypic traits, and reproductive ecology have significance because they directly affect natural productivity. In addition, significant changes in locally adapted traits due to hatchery influence, i.e. domestication, would likely be maladaptive resulting in reduced population productivity and fitness (Taylor 1991; Hard 1995). Thus, there is a need to study demographic and phenotypic traits in the YKFP in order to understand hatchery and wild population productivity, reproductive ecology, and the effects of domestication (Busack et al. 1997). Tracking trends in these traits over time is also a critical aspect of domestication monitoring (Busack et al. 2004) to determine whether trait changes have a genetic component and, if so, are they within acceptable limits. The first chapter of this report compares first generation hatchery and wild upper Yakima River spring chinook returns over a suite of life-history, phenotypic and demographic traits. The second chapter

  1. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2000-2001 Annual Report.

    SciTech Connect

    Busack, Craig A.; Schroder, Steven L.; Young, Sewall F.

    2002-11-01

    Genetic work for 2001 consisted of two major phases, both reported on here. The first is a DNA microsatellite analysis of several hundred juveniles from the experimental spawning channel at the Cle Elum Supplementation Research Facility, using the genetic markers to assign the juveniles to parents, and thus judge reproductive success of individual fish. The second is a reevaluation and revision of plans for studying domestication in the spring chinook supplementation effort. The pedigree analysis was significant in three respects. First, it showed that this approach can be successfully applied to the spawning channel research. Secondly it showed that this approach does indeed yield very useful information about the relative reproductive success of fish in the channel. Finally, it showed that this information can yield additional information about the experimental design. Of the 961 juveniles on which analysis was attempted, 774 yielded enough genetic information to be used in the pedigree analysis. Of these, 754 were assigned to males and females known to have been placed into the channel. Of the other 20, all were assignable to females, but sires were unknown. The genotypes of 17 of these were consistent with a single theoretical male genotype, suggesting a single precocial male sired them. The inferred parentage of the fish demonstrated that there had been substantial leakage of juveniles from one section of the channel into another. Reproductive success of females was fairly even, but success of males varied considerably. In a group of seven males (including the hypothetical one), one contributed 79% of the progeny analyzed, and three contributed none. The domestication experimental design evaluation was prompted by a critical review of the project by the Independent Scientific Review Panel (ISRP). The ISRP review set into motion a design revision process which extended beyond the contract period; the report presented here is intended to be an account of our

  2. Washington Department of Fish and Wildlife Smolt Monitoring Program; Lower Granite Dam on the Snake River, Washington, 1996 Annual Report.

    SciTech Connect

    Verhey, Peter; Ross, Doug; Morrill, Charles

    1996-10-01

    The 1996 fish collection season at Lower Granite was characterized by high spring flows, spill, cool spring and early summer water temperatures and comparatively low numbers of fish, particularly yearling chinook, collected and transported. A total of 5,227,672 juvenile salmonids were collected at Lower Granite, the fewest since 1986. Of these, 5,117,685 were transported to release sites below Bonneville Dam, 4,990,798 by barge and 126,887 by truck. An additional 102,430 fish were bypassed back to the river, most of these being part of the National Marine Fisheries Service transportation evaluation study. New extended length submersible bar screens (ESBS) and new vertical barrier screens were installed in all units and a prototype surface collector was installed in front of units 4, 5 and 6 and operated from 23 April through 3 June. Smolt Monitoring Program and National Biologic Survey biologists examined 4,581 fish, collected at the separator, for symptoms of Gas Bubble Disease.

  3. Use of a Fish Transportation Barge for Increasing Returns of Steelhead Imprinted for Homing, 1985 Annual Report.

    SciTech Connect

    Harmon, Jerrel R.

    1986-06-01

    A 6-year study to determine if transporting steelhead, Salmo gairdneri, smolts by barge from Dworshak National Fish Hatchery (NFH) to a release site on the Columbia River below Bonneville Dam would result in increased returns of adults to the various fisheries and to the hatchery homing sites is reported. During 1982 and 1983, over 500,000 juveniles were marked for the study. Adults have returned to in-river sampling sites, to the sport and Indian fisheries, and to the Dworshak NFH homing site from these groups of fish that were serially released as controls from the hatchery or barged as test fish to below Bonneville Dam. As of July 1985, most returns were from test and control groups released in the spring of 1982. Most returns from 1983 releases are expected during the 1985 and 1986 steelhead migration. Survival of both control and test fish released in late April and mid-May in 1982 was substantially higher than the survival of those released early (19 April) and late (31 May).

  4. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1987-1988.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide Bonneville Power Administration (BPA) in carrying out our responsibility to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gave BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife were affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for Program implementation during Fiscal Year (FY) 1988. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Program's Action Plan: to provide a solid, timely, and focused basis for budgeting and planning. Additionally, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3. It includes schedules with key milestones for FY 1988 through FY 1990. The Work Plan is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program.

  5. Smolt Monitoring Program Comparative Survival Rate Study (CSS); Oregon Department of Fish and Wildlife, Annual Report 2001-2002.

    SciTech Connect

    Jonasson, Brian; Carmichael, Richard

    2003-05-01

    We PIT-tagged juvenile spring chinook salmon reared at Lookingglass Hatchery in October 2001 as part of the Comparative Survival Rate Study (CSS) for migratory year (MY) 2002. We tagged 20,998 Imnaha stock spring chinook salmon, and after mortality and tag loss, we allowed the remaining 20,920 fish to leave the acclimation pond at our Imnaha River satellite facility beginning 21 March 2002 to begin their seaward migration. The fish remaining in the pond were forced out on 17 April 2002. We tagged 20,973 Catherine Creek stock captive brood progeny spring chinook salmon, and after mortality and tag loss, we allowed the remaining 20,796 fish to leave the acclimation ponds at our Catherine Creek satellite facility beginning 1 April 2001 to begin their seaward migration. The fish remaining in the ponds were forced out on 15 April 2001. We estimated survival rates, from release to Lower Granite Dam in MY 2002, for three stocks of hatchery spring chinook salmon tagged at Lookingglass Hatchery to determine their relative migration performance. Imnaha River stock and Lostine River stock survival rates were similar and were higher than the survival rate of Catherine Creek stock. We PIT-tagged 20,950 BY 2001 Imnaha River stock and 20,820 BY 2001 Catherine Creek stock captive brood progeny in October 2002 as part of the CSS for MY 2003. At the time the fish were transferred from Lookingglass Hatchery to the acclimation site, the rates of mortality and tag loss for Imnaha River stock were 0.14% and 0.06%, respectively. Catherine Creek stock, during the same period, had rates of mortality and tag loss of 0.57% and 0.31%, respectively. There was slightly elevated mortality, primarily from BKD, in one raceway of Catherine Creek stock at Lookingglass Hatchery for BY 2001.

  6. Projecting changes in annual hydropower generation using regional runoff data: An assessment of the United States federal hydropower plants

    SciTech Connect

    Kao, Shih -Chieh; Sale, Michael J.; Ashfaq, Moetasim; Uria Martinez, Rocio; Kaiser, Dale Patrick; Wei, Yaxing; Diffenbaugh, Noah S.

    2014-12-18

    Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease in annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.

  7. Studies in Teaching 1999 Research Digest. Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, December 1999).

    ERIC Educational Resources Information Center

    McCoy, Leah P., Ed.

    This publication presents a collection of research projects presented at the Annual Research Forum at Wake Forest University: "The Use of Group Work as an Effective Teaching Technique in Lower Level Spanish Classes" (James Blackburn); "What Are the Real Factors behind Student Motivation?" (Matthew Grey Burdick); "Can Students Communicate…

  8. Projecting changes in annual hydropower generation using regional runoff data: An assessment of the United States federal hydropower plants

    DOE PAGESBeta

    Kao, Shih -Chieh; Sale, Michael J.; Ashfaq, Moetasim; Uria Martinez, Rocio; Kaiser, Dale Patrick; Wei, Yaxing; Diffenbaugh, Noah S.

    2014-12-18

    Federal hydropower plants account for approximately half of installed US conventional hydropower capacity, and are an important part of the national renewable energy portfolio. Utilizing the strong linear relationship between the US Geological Survey WaterWatch runoff and annual hydropower generation, a runoff-based assessment approach is introduced in this study to project changes in annual and regional hydropower generation in multiple power marketing areas. Future climate scenarios are developed with a series of global and regional climate models, and the model output is bias-corrected to be consistent with observed data for the recent past. Using this approach, the median decrease inmore » annual generation at federal projects is projected to be less than –2 TWh, with an estimated ensemble uncertainty of ±9 TWh. Although these estimates are similar to the recently observed variability in annual hydropower generation, and may therefore appear to be manageable, significantly seasonal runoff changes are projected and it may pose significant challenges in water systems with higher limits on reservoir storage and operational flexibility. Lastly, future assessments will be improved by incorporating next-generation climate models, by closer examination of extreme events and longer-term change, and by addressing the interactions among hydropower and other water uses.« less

  9. Integrated Hatchery Operations Team: Operations Plans for Anadromous Fish Production Facilities in the Columbia River Basin, Volume V of V; 1992 Annual Report.

    SciTech Connect

    Weld, Enair

    1993-04-01

    Virtually all fishery resources of the Columbia River Basin are affected by water resource development initiatives. Mitigation is an action taken to lessen or reduce impacts of projects on fishery resources. The Washington Department of Wildlife`s (WDW) mitigation goal has been one that replaces in-kind or substitutes fishery resources of equal value for those impacted. WDW mitigation efforts have focused on providing hatchery-reared fish of the proper strains needed to compensate for loss of naturally produced stocks. Stewardship of these resources is based on existing WDW policies. WDW policies are written statements designed to resolve a recurring management need or problem. They do not include program goals or organization statements. The existing policies which affect fish hatchery operations are described herein.

  10. Evaluation of a Fish Passage Site in the Walla Walla River Basin, 2009 Annual Report : September 2008 - August 2009.

    SciTech Connect

    Chamness, Mickie A.

    2009-08-20

    In 2009, Pacific Northwest National Laboratory (PNNL) evaluated the Touchet Consolidated Facility to determine if it is designed, constructed, operated, and maintained to effectively provide juvenile salmonids with safe passage past the diversion and back to the Touchet River. Completed in 2008, the Touchet Consolidated Facility combined two irrigation diversions with an existing intake for the Touchet Acclimation Facility. The consolidated facility includes a separate fish screen and intake for each user, a pool and chute fishway, and an adult fish trap. The fish screens portions of the facility were evaluated on April 20, 2009, using underwater videography, acoustic Doppler velocimeter measurements, and visual observations while water was diverted to the acclimation facility alone and again as water was diverted to the irrigation system and pond together. The facility is in good condition and is well maintained, although water velocities within the site do not meet the criteria set by the National Marine Fisheries Service (NMFS). Approach velocities above 0.4 ft/s at the upstream end of the facility and decreases in sweep velocity toward the bypass are likely caused by the proximity of the upstream screen to the spill over stoplogs that control flow at the upstream end of the forebay. We recommend working with Touchet Acclimation Facility staff to try different configurations and heights of forebay stoplogs while PNNL staff measure water velocities, allowing real-time monitoring of changes in approach and sweep velocities resulting from the configuration changes. It may be possible to bring approach and sweep velocities more in line with the NMFS criteria for juvenile fish screens. We also recommend evaluating the facility later in the year when river levels are low and the irrigation district is the only water user. During the site visit, it was noted that the upstream end of the fishway has relatively closely spaced louvers that point downstream. During higher

  11. Selections from the ABC 2015 Annual Conference, Seattle, Washington: Pitching Fish and Innovative Oral and Written Business Communication Assignments

    ERIC Educational Resources Information Center

    Whalen, D. Joel, Ed.

    2016-01-01

    This article, the first of a two-part series, presents teaching 10 innovations from the 2015 Association for Business Communication's 80th annual conference. The creative new assignments offered here include building listening skills by journaling, oral interpretation, positive message framing, storytelling, delivering bad news, persuasive…

  12. Effects of Dissolved Gas Supersaturation on Fish Residing in the Snake and Columbia Rivers, 1997 Annual Report.

    SciTech Connect

    Ryan, Brad A.

    1998-04-01

    Large amounts of spill at dams has commonly generated levels of dissolved gas supersaturation that are higher than levels established by state and federal agencies setting criteria for acceptable water quality in the Columbia and Snake Rivers. Large spill volumes are sometimes provided voluntarily to increase the proportion of migrating juvenile salmon that pass dams through nonturbine routes. However, total dissolved gas supersaturation (TDGS) resulting from spill in past decades has led to gas bubble disease (GBD) in fish. Therefore, during the period of high spill in 1997, the authors monitored the prevalence and severity of gas bubble disease by sampling resident fish in Ice Harbor reservoir and downstream from Ice Harbor and Bonneville Dams.

  13. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    SciTech Connect

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  14. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    SciTech Connect

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    indicators for detecting a signal in the estuarine system resulting from the multiple projects were also reviewed, i.e. organic matter production, nutrient cycling, sedimentation, food webs, biodiversity, salmon habitat usage, habitat opportunity, and allometry. In subsequent work, this information will be used to calculate the over net effect on the ecosystem. To evaluate the effectiveness of habitat restoration actions in the lower Columbia River and estuary, a priority of this study has been to develop a set of minimum ecosystem monitoring protocols based on metrics important for the CRE. The metrics include a suite of physical measurements designed to evaluate changes in hydrological and topographic features, as well as biological metrics that will quantify vegetation and fish community structure. These basic measurements, intended to be conducted at all restoration sites in the CRE, will be used to (1) evaluate the effectiveness of various restoration procedures on target metrics, and (2) provide the data to determine the cumulative effects of many restoration projects on the overall system. A protocol manual is being developed for managers, professional researchers, and informed volunteers, and is intended to be a practical technical guide for the design and implementation of monitoring for the effects of restoration activities. The guidelines are intended to standardize the collection of data critical for analyzing the anticipated ecological change resulting from restoration treatments. Field studies in 2005 are planned to initiate the testing and evaluation of these monitoring metrics and protocols and initiate the evaluation of higher order metrics for cumulative effects.

  15. Natural Propagation and Habitat Improvement, Volume I, Oregon Supplement 5: White River Falls Fish Passage, 1983 Annual Report.

    SciTech Connect

    Lindsay, Robert

    1984-04-01

    Biological and physical characteristics of White River drainage were studied in 1983 to determine the feasibility of introducing anadromous salmonids into the watershed. Access to White River by anadromous fish is presently blocked by waterfalls located 3.4 km from the confluence with the Deschutes River. Mortality of juvenile chinook salmon from a 43 m free fall at White River Falls does not appear to be significant during high flows (300 to 500 cfs) but may be significant at low flows (115 to 150 cfs). At low flow the recapture of fish released in the south channel above the falls was 54% lower than the recapture of control fish released below the falls. The recapture of two releases in the north channel was 37% lower than the recapture of control groups. We surveyed 94 km of the lower reaches of 7 tributaries below the boundary of the Mt. Hood National Forest. We identified 8325 m/sup 2/ of anadromous spawning gravel of which 52% was good quality, 20 water withdrawals for irrigation that took a total of 33 cfs of water, 13 barriers to upstream migration of which 3 were waterfalls of 3.1 to 7.6 m, and 138 major holding and rearing pools. Maximum water temperatures of 25/sup 0/C or greater and diurnal fluctuations of around 10/sup 0/C were recorded in the lower reaches of several streams. The maximum water temperature in upper reaches of streams above the forest boundary was 13 to 14/sup 0/C. Habitat improvement opportunities identified in surveys of the lower reaches included barrier modifications for upstream passage, in-stream structures to develop pools and retain gravels, structures to reduce bank erosion, and streamside fensing to protect riparian zones. 10 references, 34 figures, 20 tables.

  16. Trailing edges projected to move faster than leading edges for large pelagic fish habitats under climate change

    NASA Astrophysics Data System (ADS)

    Robinson, L. M.; Hobday, A. J.; Possingham, H. P.; Richardson, A. J.

    2015-03-01

    There is mounting evidence to suggest that many species are shifting their ranges in concordance with the climate velocity of their preferred environmental conditions/habitat. While accelerated rates in species' range shifts have been noted in areas of intense warming, due to climate change, few studies have considered the influence that both spatial temperature gradients and rates of warming (i.e., the two components of climate velocity) could have on rates of movement in species habitats. We compared projected shifts in the core habitat of nine large pelagic fish species (five tuna, two billfish and two shark species) off the east coast of Australia at different spatial points (centre, leading and trailing edges of the core habitat), during different seasons (summer and winter), in the near-(2030) and long-term (2070), using independent species distribution models and habitat suitability models. Model projections incorporated depth integrated temperature data from 11 climate models with a focus on the IPCC SRES A2 general emission scenario. Projections showed a number of consistent patterns: southern (poleward) shifts in all species' core habitats; trailing edges shifted faster than leading edges; shifts were faster by 2070 than 2030; and there was little difference in shifts among species and between seasons. Averaging across all species and climate models, rates of habitat shifts for 2030 were 45-60 km decade-1 at the trailing edge, 40-45 km decade-1 at the centre, and 20-30 km decade-1 at the leading edge. Habitat shifts for 2070 were 60-70 km decade-1 at the trailing edge, 50-55 km decade-1 at the centre, and 30-40 km decade-1 at the leading edge. It is often assumed that the leading edge of a species range will shift faster than the trailing edge, but there are few projections or observations in large pelagic fish to validate this assumption. We found that projected shifts at the trailing edge were greater than at the centre and leading of core habitats in

  17. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001-2002 Annual Report.

    SciTech Connect

    Knudsen, Curtis M.

    2003-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from Oncorh Consulting to the Washington Department of Fish and Wildlife (WDFW), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the second in a series of reports that address reproductive ecological research and monitoring of spring chinook in the Yakima River basin. In addition to within-year comparisons, between-year comparisons will be made to determine if traits of the wild Naches basin control population, the naturally spawning population in the upper Yakima River and the hatchery control population are diverging over time. This annual report summarizes data collected between April 1, 2002 and March 31, 2003. In the future, these data will be compared to previous years to identify general trends and make preliminary comparisons. Supplementation success in the Yakima Klickitat Fishery Project's (YKFP) spring chinook (Oncorhynchus tshawytscha) program is defined as increasing natural production and harvest opportunities, while keeping adverse ecological interactions and genetic impacts within acceptable bounds (Busack et al. 1997). Within this context demographics, phenotypic traits, and reproductive ecology have significance because they directly affect natural productivity. In addition, significant changes in locally adapted traits due to hatchery influence, i.e. domestication, would likely be maladaptive resulting in reduced population productivity and fitness (Taylor 1991; Hard 1995). Thus, there is a need to study demographic and phenotypic traits in the YKFP in order to understand hatchery and wild population productivity, reproductive ecology, and the effects of domestication (Busack et al. 1997). Tracking trends in these traits over time is also a critical aspect of domestication monitoring (Busack et al

  18. 1994 annual status report: a summary of fish data in six reaches of the upper Mississippi River system

    USGS Publications Warehouse

    Gutreuter, Steve; Burkhardt, Randy W.; Stopyro, Mark; Bartels, Andrew; Kramer, Eric; Bowler, Melvin C.; Cronin, Frederick A.; Soergel, Dirk W.; Petersen, Michael D.; Herzog, David P.; Raibley, Paul T.; Irons, Kevin S.; O'Hara, Timothy M.

    1997-01-01

    The Long Term Resource Monitoring Program (LTRMP) completed 2,653 collections of fishes from stratified random and permanently fixed sampling locations in six study reaches of the Upper Mississippi River System during 1994. Collection methods included day and night electrofishing, hoop netting, fyke netting (two net sizes), gill netting, seining, and trawling in select aquatic area classes. The six LTRMP study areas are Pools 4 (excluding Lake Pepin), 8, 13, and 26 of the Upper Mississippi River, and unimpounded reach of the Mississippi River near Cape Girardeau, Missouri, and the La Grange Pool of the Illinois River. A total of 61-79 fish species were detected in each study area. For each of the six LTRMP study areas, this report contains summaries of (1) sampling efforts in each combination of gear type and aquatic area class, (2) total catches of each species from each gear type, (3) mean catch-per-unit of gear effort statistics and standard errors for common species from each combination of aquatic area class and selected gear type, and (4) length distributions of common species from selected gear types.

  19. 1993 annual status report: a summary of fish data in six reaches of the upper Mississippi River system

    USGS Publications Warehouse

    Gutreuter, Steve; Burkhardt, Randy W.; Stopyro, Mark; Bartels, Andrew; Kramer, Eric; Bowler, Melvin C.; Cronin, Frederick A.; Soergel, Dirk W.; Petersen, Michael D.; Herzog, David P.; Raibley, Paul T.; Irons, Kevin S.; O'Hara, Timothy M.

    1997-01-01

    The Long Term Resource Monitoring Program (LTRMP) completed 1,994 collections of fishes from stratified random and permanently fixed sampling locations in six study reaches of the Upper Mississippi River System during 1993. Collection methods included day and night electrofishing, hoop netting, fyke netting (two net sizes), gill netting, seining, and trawling in select aquatic area classes. The six LTRMP study reaches are Pools 4 (excluding Lake Pepin), 8, 13, and 26 of the Upper Mississippi River, an unimpounded reach of the Mississippi River near Cape Girardeau, Missouri, and the La Grange Pool of the Illinois River. A total of 62-78 fish species were detected in each study reach. For each of the six LTRMP study reaches, this report contains summaries of: (1) sampling efforts in each combination of gear type and aquatic area class, (2) total catches of each species from each gear type, (3) mean catch-per-unit of gear effort statistics and standard errors for common species from each combination of aquatic area class and selected gear type, and (4) length distributions of common species from selected gear types.

  20. Phase 1 summaries of radionuclide concentration data for vegetation, river water, drinking water, and fish. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Denham, D.H.; Dirkes, R.L.; Hanf, R.W.; Poston, T.M.; Thiede, M.E.; Woodruff, R.K.

    1993-06-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at the Hanford Site since 1944. As part of the HEDR Project, the Environmental Monitoring Data Task (Task 05) staff assemble, evaluate, and summarize key historical measurements of radionuclide concentrations in the environment as a result of Hanford operations. The scope of work performed during Phase I included initiating the search, recovery, and inventory of environmental reports. Summaries of the environmental monitoring data that were recovered and evaluated are presented for specific periods of interest. These periods include vegetation monitoring data (primarily sagebrush) for the years 1945 through 1947, Columbia River water and drinking water monitoring data for the years 1963 through 1966, and fish monitoring data for the years 1964 through 1966. Concern was limited to those radionuclides identified as the most likely major contributors to the dose potentially received by the public during the times of interest: phosphorous-32, copper-64, zinc-65, arsenic-76, and neptunium-239 in Columbia River fish and drinking water taken from the river, and iodine-131 in vegetation. This report documents the achievement of the Phase I objectives of the Environmental Monitoring Data Task.

  1. Monitoring and Evaluation : Yakima/Klickitat Fisheries Project, Annual Report 2001.

    SciTech Connect

    Sampson, Melvin R.

    2002-12-01

    The monitoring and evaluation objectives and tasks have been developed through a joint process between the co-managers, Yakama Nation (YN, Lead Agency) and Washington Department of Fish and Wildlife (WDFW). The Science/Technical Advisory Committee (STAC), which consists of core members from the co-managers, employs the services of a work committee of scientists, the Monitoring Implementation Planning Team (MIPT) to develop the Monitoring and Evaluation (M&E) Plan. The process employed by STAC to verify these designated activities and the timing of their implementation involved the utilization of the following principles: (1) YKFP monitoring should evaluate the success (or lack of it) of project supplementation efforts and its impacts, including juvenile post release survival, natural production and reproductive success, ecological interactions, and genetics; (2) YKFP monitoring should be comprehensive: and, (3) YKFP monitoring should be done in such a way that results are of use to salmon production efforts throughout and Columbia basin and the region. Utilizing these principles, STAC and MIPT developed this M&E action plan in three phases. The first phase was primarily conceptual. STAC and MIPT defined critical issues and problems and identified associated response variables. The second phase was quantitative, which determined the scale and size of an effective monitoring effort. A critical element of the quantitative phase was an assessment of the precision with which response variables can be measured, the probability of detecting real impacts and the sample sizes required for a given level of statistical precision and power. The third phase is logistical. The feasibility of monitoring measures was evaluated as to practicality and cost. The Policy Group has determined that the M&E activities covered by this agreement are necessary, effective and cost-efficient.

  2. A Study to Determine the Biological Feasibility of a New Fish-Tagging System, 1996-1997; Annual Report.

    SciTech Connect

    Downing, Sandra L.; Jonasson, Bruce F.; Nunnallee, Edmund P.; Peterson, Bradley W.; Prentice, Earl F.

    1998-03-01

    This report covers work performed by National Marine Fisheries Service (NMFS) during 1996 and 1997 in cooperation with the Bonneville Power Administration (BPA). The project focused on expanding and improving PIT-tag technology throughout the Columbia River Basin (CRB).

  3. Seasonal Variation in Female Mate Choice and Operational Sex Ratio in Wild Populations of an Annual Fish, Austrolebias reicherti

    PubMed Central

    Passos, Carlos; Tassino, Bettina; Reyes, Federico; Rosenthal, Gil G.

    2014-01-01

    The intensity of mating competition and the potential benefits for female of mating with certain males can be influenced by several extrinsic factors, such that behavioral decisions can be highly context-dependent. Short-lived species with a single reproductive season are a unique model to study context-sensitive mating decisions. Through exhaustive sampling in the field and simultaneous choice tests in the laboratory, we evaluated operational sex ratio (OSR) and female mate choice at the beginning and end of the reproductive season in the annual killifish Austrolebias reicherti. We found seasonal change in both OSR and female mate choice. At the start of the reproductive season the OSR did not deviate from parity, and females preferred larger males. Later in the reproductive season, while the proportion of males in the ponds decreased, females became unselective with respect to male size. The particular biological cycle of annual killifish, where both life expectancy and mating opportunities decline sharply over a short timescale, could account for the seasonal change in female choice. Reduction in choosiness could arise from diminished reproductive prospects due to a decline in male availability. Moreover, as the end of the season approaches, any benefits of choosiness are presumably reduced: a female’s fitness will be higher if she mates with any male than if she forgoes reproduction and dies. Future work will disentangle the mechanisms underlying seasonal changes in mating preferences, notably direct responses to demographic factors, environmental cues, or intrinsic changes during development. PMID:25029019

  4. Monitor and Protect Wigwam River Bull Trout for Koocanusa Reservoir; Skookumchuck Creek Juvenile Bull Trout and Fish Habitat Monitoring Program, Annual Report 2002.

    SciTech Connect

    Cope, R.

    2003-06-01

    The Skookumchuck Creek juvenile bull trout (Salvelinus confluentus) and fish habitat-monitoring program is a co-operative initiative of the British Columbia Ministry of Water, Land, and Air Protection and Bonneville Power Administration. This project was commissioned in planning for fish habitat protection and forest development within the Skookumchuck Creek watershed and was intended to expand upon similar studies initiated within the Wigwam River from 2000 to 2002. The broad intent is to develop a better understanding of juvenile bull trout and Westslope cutthroat trout recruitment and the ongoing hydrologic and morphologic processes, especially as they relate to spawning and rearing habitat quality. The 2002 project year represents the first year of a long-term bull trout-monitoring program with current studies focused on collecting baseline information. This report provides a summary of results obtained to date. Bull trout represented 72.4% of the catch. Fry dominated the catch because site selection was biased towards electrofishing sample sites which favored high bull trout fry capture success. The mean density of all juvenile bull trout was estimated to be 6.6 fish/100m{sup 2}. This represents one-half the densities reported for the 2002 Wigwam River enumeration program, even though enumeration of bull trout redds was an order of magnitude higher for the Wigwam River. Typically, areas with combined fry and juvenile densities greater than 1.5 fish per 100 m{sup 2} are cited as critical rearing areas. Trends in abundance appeared to be related to proximity to spawning areas, bed material size, and water depth. Cover components utilized by juvenile and adult bull trout and cutthroat trout were interstices, boulder, depth, overhead vegetation and LWD. The range of morphological stream types encompass the stable and resilient spectrum (C3(1), C3 and B3c). The Skookumchuck can be generalized as a slightly entrenched, meandering, riffle-pool, cobble dominated

  5. A Study to Determine the Biological Feasibility of a New Fish Tagging System : Annual Report 1990-1993.

    SciTech Connect

    Prentice, Earl F.; Maynard, D.J.; Downing, S.L.

    1994-01-01

    In 1983, the National Marine Fisheries Service (NMFS) began a multiyear cooperative research program with the Bonneville Power Administration (BPA) to evaluate a new miniaturized identification system that could be used with salmonids. The system is referred to as the passive-integrated-transponder (PIT) tagging and interrogation system. The program has focused on determining the effects of PIT tags on juvenile and adult salmonids, as well as the development and evaluation of tagging and interrogation methods. Earlier results of the program have been reported in annual reports and journal articles cited in this report. This report covers the work per formed from 1990 through 1993. For convenience, the report is divided into three sections: (1) Interrogation and separation systems at Columbia River Basin dams; (2) Systems development and evaluation; and (3) Information and technology transfer.

  6. Salmon River Habitat Enhancement, 1984 Annual Report.

    SciTech Connect

    Konopacky, Richard C.

    1986-04-01

    This report has four volumes: a Tribal project annual report (Part 1) and three reports (Parts 2, 3, and 4) prepared for the Tribes by their engineering subcontractor. The Tribal project annual report contains reports for four subprojects within Project 83-359. Subproject I involved habitat and fish inventories in Bear Valley Creek, Valley County, Idaho that will be used to evaluate responses to ongoing habitat enhancement. Subproject II is the coordination/planning activities of the Project Leader in relation to other BPA-funded habitat enhancement projects that have or will occur within the traditional Treaty (Fort Bridger Treaty of 1868) fishing areas of the Shoshone-Bannock Tribes, Fort Hall Reservation, Idaho. Subproject III involved habitat and fish inventories (pretreatment) and habitat problem identification on the Yankee Fork of the Salmon River (including Jordan Creek). Subproject IV during 1985 involved habitat problem identification in the East Fork of the Salmon River and habitat and fish inventories (pretreatment) in Herd Creek, a tributary to the East Fork.

  7. Regulation of microRNA expression in the neuronal stem cell niches during aging of the short-lived annual fish Nothobranchius furzeri

    PubMed Central

    Terzibasi Tozzini, Eva; Savino, Aurora; Ripa, Roberto; Battistoni, Giorgia; Baumgart, Mario; Cellerino, Alessandro

    2014-01-01

    In the last decade, our group has intensively studied the annual fish Nothobranchius furzeri as a new experimental model in Biology specifically applied to aging research. We previously studied adult neuronal stem cells of N. furzeri in vivo and we demonstrated an age-dependent decay in adult neurogenesis. More recently we identified and quantified the expression of miRNAs in the brain of N. furzeri and we detected 165 conserved miRNAs and found that brain aging in this fish is associated with coherent up-regulation of well-known tumor suppressor miRNAs, as well as down-regulation of well-known onco miRNAs~– In the present work we characterized the expression of miR-15a, miR-20a, and microRNA cluster 17–92 in the principal neurogenic niches of the brain of young and old subjects of N. furzeri, by using in situ hybridization techniques, together with proliferating-cell nuclear antigen immuno-staining for a simultaneous visualization of the neuronal progenitors. We found that: (1) the expression of miR-15a is higher in the brain of old subjects and concentrates mainly in the principal neurogenic niches of telencephalon and optic tectum, (2) the expression of miR-20a is higher in the brain of young subjects, but more widespread to the areas surrounding the neurogenic niches, (3) finally, the expression of the microRNA cluster 17–92 is higher in the brain of young subjects, concentrated mainly in the principal neurogenic niches of telencephalon and cerebellum, and with reduced intensity in the optic tectum. Taken together, our data show that these microRNAs, originally identified in whole-brain analysis, are specifically regulated in the stem cell niche during aging. PMID:24600353

  8. Hydrologic conditions, habitat characteristics, and occurrence of fishes in the Apalachicola River floodplain, Florida; second annual report of progress, October 1993-September 1994

    USGS Publications Warehouse

    Light, Helen M.; Darst, Melanie R.; Grubbs, J.W.

    1995-01-01

    This report describes progress and interim results of the second year of a 4-year study. The purpose of the 4-year study is to describe aquatic habitat types in the Apalachicola River floodplain and quantify the amount of habitat inundated by the river at various stages. Final results will be used to determine possible effects of altered flows on floodplain habitats and their associated fish communities. The study is being conducted by the U.S. Geological Survey in cooperation with the Northwest Florida Water Management District as part of a comprehensive study of water needs throughout two large river basins in Florida, Georgia, and Alabama. By the end of the second year, approxi- mately 80 to 90 percent of field data collection was completed. Water levels at 56 floodplain and main channel locations at study sites were read numerous times during low water and once or twice during high water. Rating curves estimating the relationship between stage at a floodplain site and flow of the Apalachicola River at Chattahoochee are presented for 3 sites in the upper river. Elevation, substrate type, and amount of vegetative structure were described at 27 cross sections representing eight different floodplain tributary types at upper, middle, and lower river study sites. A summary of substrate and structure information from all cross sections is presented. Substrate and structure characteristics of floodplain habitats inundated when river flow was at record low flow, mean annual low flow, and mean flow are described for 3 cross sections in the upper river. Digital coverage of high-altitude infra-red aerial photography was processed for use in a Geographic Information System which will be used to map aquatic habitats in the third year of the study. A summary of the literature on fish utilization of floodplain habitats is described. Eighty-one percent of the species collected in the main channel of the Apalachicola River are known to occur in floodplain habitats of eastern

  9. Projected risk of population declines for native fish species in the Upper Mississippi River

    USGS Publications Warehouse

    Crimmins, S.M.; Boma, P.; Thogmartin, W.E.

    2015-01-01

    Conservationists are in need of objective metrics for prioritizing the management of habitats. For individual species, the threat of extinction is often used to prioritize what species are in need of conservation action. Using long-term monitoring data, we applied a Bayesian diffusion approximation to estimate quasi-extinction risk for 54 native fish species within six commercial navigation reaches along a 1350-km gradient of the upper Mississippi River system. We found a strong negative linear relationship between quasi-extinction risk and distance upstream. For some species, quasi-extinction estimates ranged from nearly zero in some reaches to one in others, suggesting substantial variability in threats facing individual river reaches. We found no evidence that species traits affected quasi-extinction risk across the entire system. Our results indicate that fishes within the upper Mississippi River system face localized threats that vary across river impact gradients. This suggests that conservation actions should be focused on local habitat scales but should also consider the additive effects on downstream conditions. We also emphasize the need for identification of proximate mechanisms behind observed and predicted population declines, as conservation actions will require mitigation of such mechanisms. Published 2014. This article is a U.S. Government work and is in the public domain in the USA.

  10. Where Are All the Fish: Potential of Biogeographical Maps to Project Current and Future Distribution Patterns of Freshwater Species

    PubMed Central

    Markovic, Danijela; Freyhof, Jörg; Wolter, Christian

    2012-01-01

    The dendritic structure of river networks is commonly argued against use of species atlas data for modeling freshwater species distributions, but little has been done to test the potential of grid-based data in predictive species mapping. Using four different niche-based models and three different climate change projections for the middle of the 21st century merged pairwise as well as within a consensus modeling framework, we studied the variability in current and future distribution patterns of 38 freshwater fish species across Germany. We used grid-based (11×11 km) fish distribution maps and numerous climatic, topographic, hydromorphologic, and anthropogenic factors derived from environmental maps at a finer scale resolution (250 m–1 km). Apart from the explicit predictor selection, our modeling framework included uncertainty estimation for all phases of the modeling process. We found that the predictive performance of some niche-based models is excellent independent of the predictor data set used, emphasizing the importance of a well-grounded predictor selection process. Though important, climate was not a primary key factor for any of the studied fish species groups, in contrast to substrate preferences, hierarchical river structure, and topography. Generally, distribution ranges of cold-water and warm-water species are expected to change significantly in the future; however, the extent of changes is highly uncertain. Finally, we show that the mismatch between the current and future ranges of climatic variables of more than 90% is the most limiting factor regarding reliability of our future estimates. Our study highlighted the underestimated potential of grid cell information in biogeographical modeling of freshwater species and provides a comprehensive modeling framework for predictive mapping of species distributions and evaluation of the associated uncertainties. PMID:22792361

  11. Status of India's population education programme--the subject of tripartite projects review and annual country review.

    PubMed

    1981-12-01

    A 3-step monitoring of India's population education program was undertaken in 1981 in order to determine the level of implementation and progress of the program. This monitoring program, conducted by the Unesco Mobile Team in collaboration with other institutions, followed 3 procedures: Project Progress Report (PPR); Tripartite Project Review (TPR); and Annual Country Review (ACR). The review meetings of the 10 state population education projects were organized at Chandigarh and Madras during August. The states covered in the review were Bihar, Haryana, Madhaya Pradesh, Punjab, Rajasthan, Chandigarh, Gujarat, Karnataka, Maharashtra, and Tamil Nadu. The Tripartite Review identified the following as problems which were hindering the smooth implementation of the population education program: 1) difficulty in spending funds unless certain formalities were completed by the governments of the states; 2) administrative problems such as getting printing paper for instructional materials, waiving the sales tax for equipment to be purchased under the project, and uncertainty regarding the admissible rates of per diem to be paid to the participants in various training programs; 3) the lack of experience of project staff; 4) problems created by having more than 1 cell in a state such as Rajasthan; and 5) an inadequate time frame within which the project should complete all its activities and make population education an integral part of the school system. The following were among the recommendations made: 1) the Project should be made coterminous with the 6th Five-Year Plan up to March 31, 1985; and 2) there should be only 1 Population Education Cell in every state. Among the points discussed at the annual country review, held during October, were the following: rephasing of the program from a 3 to 5 year project to synchronize it with the 6th plan; and the need for additional funds in view of inflation. PMID:12264113

  12. Inter-annual variations in the abundance of young-of-the-year of migratory fishes in the Upper Paraná River floodplain: relations with hydrographic attributes.

    PubMed

    Suzuki, H I; Agostinho, A A; Bailly, D; Gimenes, M F; Júlio, H F; Gomes, L C

    2009-06-01

    In this study, we identified and characterized the hydrographic attributes related to the success of recruitment of migratory fishes in the Upper Paraná River floodplain. To achieve our objectives, we analyzed inter-annual variations in the abundance of young-of-the-year (YOY; index of recruitment) of six migratory species and their relations with hydrographic attributes. Recruitment was related to the intensity, duration (in different fluviometrical levels), elasticity, number of pulses, greater uninterrupted overflow and delay of the floods (all obtained using the PULSO software). Collections of fish were conducted in the period between January 1987 and November 2007 in distinct environments (river channels, secondary channels and connected and disconnected floodplain lakes) distributed along three subsystems (Paraná, Baía and Ivinheima). Relations between recruitment and the attributes of interest were determined through analysis of covariance. In the studied period, the highest abundances of YOY were registered in 2007, followed by 1992, 1993, 2005 and 1988. The abundance of YOY was positively correlated with an intensity of high water levels (potamophase) and the duration of potamophase 1 and negatively with the duration of low water levels (limnophase) and a delay of flood. Higher hydrometric levels (540 and 610 cm for Paraná and 325 and 450 cm for Ivinheima) and greatest uninterrupted overflow presented different relations (significant interactions) among subsystems, but all with positive effects on recruitment. Results evidenced that recruitment responded better when floods started in January with potamophase intensities above 610 cm and water levels above 450 cm over a period of 50 days and repeated every two years (or > 610 cm for 38 days and repeated every two or three years). Therefore, artificial control of the floods at intervals of two or three years by manipulating the discharge of dams located upstream from the floodplain in a way that promotes

  13. Field Review of Fish Habitat Improvement Projects in the Grande Ronde and John Day River Basins of Eastern Oregon.

    SciTech Connect

    Beschta, Robert L.; Platts, William S.; Kauffman, J. Boone

    1991-10-01

    The restoration of vegetation adapted to riparian environments and the natural succession of riparian plant communities is necessary to recreate sustainable salmonid habitat and should be the focal point for fish habitat improvement programs. In mid-August of 1991, a field review of 16 Salmon habitat improvement sites in the Grande Ronde and John Day River Basins in Eastern Oregon was undertaken. The review team visited various types of fish habitat improvements associated with a wide range of reach types, geology, channel gradients, stream sizes, and vegetation communities. Enhancement objectives, limiting factors, landuse history, and other factors were discussed at each site. This information, in conjunction with the reviewer's field inspection of portions of a particular habitat improvement project, provided the basis for the following report. This report that follows is divided into four sections: (1) Recommendations, (2) Objectives, (3) Discussion and Conclusions, and (4) Site Comments. The first section represents a synthesis of major recommendations that were developed during this review. The remaining sections provide more detailed information and comments related to specific aspects of the field review.

  14. Annual Stock Assessment - CWT [Coded Wire Tag program] (USFWS), Annual Report 2007.

    SciTech Connect

    Pastor, Stephen M.

    2009-07-21

    In 1989 the Bonneville Power Administration (BPA) began funding the evaluation of production groups of juvenile anadromous fish not being coded-wire tagged for other programs. These groups were the 'Missing Production Groups'. Production fish released by the U.S. Fish and Wildlife Service (FWS) without representative coded-wire tags during the 1980s are indicated as blank spaces on the survival graphs in this report. This program is now referred to as 'Annual Stock Assessment - CWT'. The objectives of the 'Annual Stock Assessment' program are to: (1) estimate the total survival of each production group, (2) estimate the contribution of each production group to fisheries, and (3) prepare an annual report for USFWS hatcheries in the Columbia River basin. Coded-wire tag recovery information will be used to evaluate the relative success of individual brood stocks. This information can also be used by salmon harvest managers to develop plans to allow the harvest of excess hatchery fish while protecting threatened, endangered, or other stocks of concern. All fish release information, including marked/unmarked ratios, is reported to the Pacific States Marine Fisheries Commission (PSMFC). Fish recovered in the various fisheries or at the hatcheries are sampled to recover coded-wire tags. This recovery information is also reported to PSMFC. This report has been prepared annually starting with the report labeled 'Annual Report 1994'. Although the current report has the title 'Annual Report 2007', it was written in fall of 2008 using data available from RMIS that same year, and submitted as final in January 2009. The main objective of the report is to evaluate survival of groups which have been tagged under this ongoing project.

  15. A Study to Determine the Biological Feasibility of a New Fish-Tagging System : Annual Report 1998-1999.

    SciTech Connect

    Downing, Sandra L.; Prentice, Earl F.; Peterson, Bradley W.; Nunnallee, Edmund P.; Jonasson, Bruce F.

    2000-09-01

    This report covers our work during 1998 and 1999 (FY99) on a project to expand and improve technology for passive-integrated-transponder tags (PIT tags) throughout the Columbia River Basin. The National Marine Fisheries Service (NMFS) in cooperation with the Bonneville Power Administration (BPA) conducted the work. Timely and accurate information derived from PIT-tag technology is increasingly critical to resource stakeholders in assessing the effectiveness of efforts to enhance survival of juvenile and adult salmonids. Continued development of PIT-tag technology will enable researchers and fisheries managers to address issues expressed in the NMFS biological opinions for operation of the Federal Columbia River Power System (FCRPS) and the proposed Snake River Recovery Plan. The FY99 work was divided into individual projects that are covered separately in this report.

  16. Kelt Reconditioning: A Research Project to Enhance Iteroparity in Columbia Basin Steelhead (Oncorhynchus mykiss), 2003 Annual Report.

    SciTech Connect

    Hatch, Douglas R.; Branstetter, Ryan; Blodgett, Joe

    2004-03-01

    . Oxytetracycline was administered to reconditioned fish to boost immune system response following the stress of initial capture. Formalin was also administered to prevent outbreaks of fungus and we also intubated the fish that were collected with Ivermectin{trademark} to control internal parasites (e.g., Salmincola spp.). Captured kelts were separated into two experimental groups: short-term and long-term reconditioning. Success indicators for the short-term experiment include the proportion of fish that survived the reconditioning process and the proportion of fish that initiated a feeding response. Short-term kelts were reconditioned for 3 to 7 weeks. Surviving specimens were released for natural spawning on June 4, 2003. Survival-to-release was very good for the short-term experiment, with a rate of 89.9%. Long-term steelhead kelts were held for 5-9 months then released on December 8, 2003. Long-term success indicators include the proportion of fish that survived the reconditioning process and the proportion of surviving fish that successfully remature. Survival and rematuration for long-term kelts increased as well with 62.4% surviving to release and 91.7% rematuring. A total of 47 reconditioned kelts were radio tagged to assess their spawning migration behavior and success following release from Prosser Hatchery and to evaluate in-season homing fidelity. As in previous years, the kelts reconditioned during this project will substantially bolster the number of repeat spawners in the Yakima River. Valuable knowledge regarding kelt husbandry, condition, and rearing environments were obtained during this research endeavor. The authors were very pleased with the high survival rates. Information collected during this feasibility study has been significantly incorporated into the experimental design for upcoming years of research, and is expected to continue to increase survival of long-term reconditioned fish and successful expression of iteroparity.

  17. Kelt Reconditioning: A Research Project to Enhance Iteroparity in Columbia Basin Steelhead (Oncorhynchus mykiss), 2000 Annual Report.

    SciTech Connect

    Evans, Allen F.; Beaty, Roy E.; Hatch, Douglas R.

    2001-12-01

    Repeat spawning is a life history strategy that is expressed by some species from the family salmonidae. Natural rates of repeat spawning for Columbia River steelhead Oncorhynchus mykiss populations range from 1.6 to 17%. Increasing this repeat spawning rate using fish culture techniques could assist the recovery of depressed steelhead populations. Reconditioning is the process of culturing post-spawned fish (kelts) in a captive environment until they are able to grow and develop mature gonads. Kelt reconditioning techniques were initially developed for Atlantic salmon Salmo salar and sea-trout S. trutta. The recent Endangered Species Act listing of many Columbia Basin steelhead populations has prompted interest in developing reconditioning methods for local populations. The primary purpose of this project in 2000 was to test the general feasibility of collecting, feeding, and treating steelhead kelts in a captive environment. Steelhead kelts were collected from the Yakima River at the Chandler Juvenile Evaluation Facility (Rkm 48) from 12 March to 13 June 2000. Kelts were reconditioned at adjacent Prosser Hatchery in both rectangular and circular tanks and fed a mixed diet of starter paste, adult sized trout pellets, and freeze-dried krill. Formalin was used to control outbreaks of fungus, and we tested the use of ivermectin to control internal parasites (e.g., Salmincola spp.). Some the kelts that died during the reconditioning process were analyzed via pathology and gonad histology to ascertain the possible cause of death and to describe their reproductive development at the time of death. All surviving specimens were released for natural spawning on 12 December 2000. Overall success of the reconditioning process was based on the proportion of fish that survived captivity, gained weight, and on the number of fish that successfully underwent gonadal recrudescence. Many of the reconditioned kelts were radio tagged to assess their spawning migration behavior and

  18. Integrating forage, wildlife, water, and fish projections with timber projections at the regional level: A case study in southern United States

    NASA Astrophysics Data System (ADS)

    Joyce, Linda A.; Flather, Curtis H.; Flebbe, Patricia A.; Hoekstra, Thomas W.; Ursic, Stan J.

    1990-07-01

    The impact of timber management and land-use change on forage production, turkey and deer abundance, red-cockaded woodpecker colonies, water yield, and trout abundance was projected as part of a policy study focusing on the southern United States. The multiresource modeling framework used in this study linked extant timber management and land-area policy models with newly developed models for forage, wildlife, fish, and water. Resource production was integrated through a commonly defined land base that could be geographically partitioned according to individual resource needs. Resources were responsive to changes in land use, particularly human-related, and timber management, particularly the harvest of older stands, and the conversion to planted pine.

  19. Fish and wildlife surveillance

    SciTech Connect

    Poston, T.M.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the monitoring of radioactive contaminants in fish and wildlife species that inhabit the Colombia River and Hanford Site. Wildlife have access to areas of the Site containing radioactive contamination, and fish can be exposed to contamination in spring water entering the river along the shoreline. Therefore, samples are collected at various locations annually, generally during the hunting or fishing season, for selected species.

  20. Comparison of captive lifespan, age-associated liver neoplasias and age-dependent gene expression between two annual fish species: Nothobranchius furzeri and Nothobranchius korthause.

    PubMed

    Baumgart, Mario; Di Cicco, Emiliano; Rossi, Giacomo; Cellerino, Alessandro; Tozzini, Eva Terzibasi

    2015-02-01

    Nothobranchius is a genus of annual fish broadly distributed in South-Eastern Africa and found into temporary ponds generated during the rain seasons and their lifespan is limited by the duration of their habitats. Here we compared two Nothobranchius species from radically different environments: N. furzeri and N. korthausae. We found a large difference in life expectancy (29- against 71-weeks of median life span, 40- against 80-weeks of maximum lifespan, respectively), which correlates with a diverse timing in the onset of several age dependent processes: our data show that N. korthause longer lifespan is associated to retarded onset of age-dependent liver-neoplasia and slower down-regulation of collagen 1 alpha 2 (COL1A2) expression in the skin. On the other hand, the expression of cyclin B1 (CCNB1) in the brain was strongly age-regulated, but with similar profiles in N. furzeri and N. korthausae. In conclusion, our data suggest that the different ageing rate of two species of the same genus could be used as novel tool to investigate and better understand the genetic bases of some general mechanism leading to the complex ageing process, providing a strategy to unravel some of the genetic mechanisms regulating longevity and age-associate pathologies including neoplasias. PMID:25315356