Science.gov

Sample records for friction units operating

  1. Friction-based energy dissipation unit for circuit breaker

    SciTech Connect

    Kar, R.; Rainer, J.H.

    1995-12-31

    This paper describes a friction-based energy dissipation unit (EDU) that has been designed to introduce supplemental damping into a circuit breaker. The brittle porcelain insulator posts of a 330 kV SF6 breaker were thus subjected to reduced forces from a design earthquake specified to have a peak ground acceleration of 1.05 g. Pull and release tests were performed to determine the dynamic properties, i.e., natural frequency, damping ratio, and mode shapes. Calculations of response of the circuit breaker to the 1940 El Centro N-S component shows that the EDU reduces the bending moment at the base of the porcelain column by a factor of three.

  2. Friction

    NASA Astrophysics Data System (ADS)

    Matsuo, Yoshihiro; Clarke, Daryl D.; Ozeki, Shinichi

    Friction materials such as disk pads, brake linings, and clutch facings are widely used for automotive applications. Friction materials function during braking due to frictional resistance that transforms kinetic energy into thermal energy. There has been a rudimentary evolution, from materials like leather or wood to asbestos fabric or asbestos fabric saturated with various resins such as asphalt or resin combined with pitch. These efforts were further developed by the use of woven asbestos material saturated by either rubber solution or liquid resin binder and functioned as an internal expanding brake, similar to brake lining system. The role of asbestos continued through the use of chopped asbestos saturated by rubber, but none was entirely successful due to the poor rubber heat resistance required for increased speeds and heavy gearing demands of the automobile industry. The use of phenolic resins as binder for asbestos friction materials provided the necessary thermal resistance and performance characteristics. Thus, the utility of asbestos as the main friction component, for over 100 years, has been significantly reduced in friction materials due to asbestos identity as a carcinogen. Steel and other fibrous components have displaced asbestos in disk pads. Currently, non-asbestos organics are the predominate friction material. Phenolic resins continue to be the preferred binder, and increased amounts are necessary to meet the requirements of highly functional asbestos-free disk pads for the automotive industry. With annual automobile production exceeding 70 million vehicles and additional automobile production occurring in developing countries worldwide and increasing yearly, the amount of phenolic resin for friction material is also increasing (Fig. 14.1). Fig. 14.1 Worldwide commercial vehicle production Multi-unit operations considerations.

    SciTech Connect

    Gilmore, Walter E.; Bennett, Thomas C.; Brannon, Nathan Gregory

    2005-09-01

    Several nuclear weapons programs have or are pursuing the implementation of multi-unit operations for tasks such as disassembly and inspection, and rebuild. A multi-unit operation is interpreted to mean the execution of nuclear explosive operating procedures in a single facility by two separate teams of technicians. The institution of a multi-unit operations program requires careful consideration of the tools, resources, and environment provided to the technicians carrying out the work. Therefore, a systematic approach is necessary to produce safe, secure, and reliable processes. In order to facilitate development of a more comprehensive multi-unit operations program, the current work details categorized issues that should be addressed prior to the implementation of multi-unit operations in a given weapons program. The issues have been organized into the following categories: local organizational conditions, work process flow/material handling/workplace configuration, ambient environmental conditions, documented safety analysis, and training.

  3. Experimental Study of Reciprocating Friction between Rape Stalk and Bionic Nonsmooth Surface Units.

    PubMed

    Ma, Zheng; Li, Yaoming; Xu, Lizhang

    2015-01-01

    Background. China is the largest producer of rape oilseed in the world; however, the mechanization level of rape harvest is relatively low, because rape materials easily adhere to the cleaning screens of combine harvesters, resulting in significant cleaning losses. Previous studies have shown that bionic nonsmooth surface cleaning screens restrain the adhesion of rape materials, but the underlying mechanisms remain unclear. Objective. The reciprocating friction between rape stalk and bionic nonsmooth metal surface was examined. Methods. The short-time Fourier transform method was used to discriminate the stable phase of friction signals and the stick-lag distance was defined to analyze the stable reciprocating friction in a phase diagram. Results. The reciprocating friction between rape stalk and metal surface is a typical stick-slip friction, and the bionic nonsmooth metal surfaces with concave or convex units reduced friction force with increasing reciprocating frequency. The results also showed that the stick-lag distance of convex surface increased with reciprocating frequency, which indicated that convex surface reduces friction force more efficiently. Conclusions. We suggest that bionic nonsmooth surface cleaning screens, especially with convex units, restrain the adhesion of rape materials more efficiently compared to the smooth surface cleaning screens. PMID:27034611

  4. Experimental Study of Reciprocating Friction between Rape Stalk and Bionic Nonsmooth Surface Units

    PubMed Central

    Ma, Zheng; Li, Yaoming; Xu, Lizhang

    2015-01-01

    Background. China is the largest producer of rape oilseed in the world; however, the mechanization level of rape harvest is relatively low, because rape materials easily adhere to the cleaning screens of combine harvesters, resulting in significant cleaning losses. Previous studies have shown that bionic nonsmooth surface cleaning screens restrain the adhesion of rape materials, but the underlying mechanisms remain unclear. Objective. The reciprocating friction between rape stalk and bionic nonsmooth metal surface was examined. Methods. The short-time Fourier transform method was used to discriminate the stable phase of friction signals and the stick-lag distance was defined to analyze the stable reciprocating friction in a phase diagram. Results. The reciprocating friction between rape stalk and metal surface is a typical stick-slip friction, and the bionic nonsmooth metal surfaces with concave or convex units reduced friction force with increasing reciprocating frequency. The results also showed that the stick-lag distance of convex surface increased with reciprocating frequency, which indicated that convex surface reduces friction force more efficiently. Conclusions. We suggest that bionic nonsmooth surface cleaning screens, especially with convex units, restrain the adhesion of rape materials more efficiently compared to the smooth surface cleaning screens. PMID:27034611

  5. United Formula for the Friction Factor in the Turbulent Region of Pipe Flow

    PubMed Central

    Li, Shuolin; Huai, Wenxin

    2016-01-01

    Friction factor is an important element in both flow simulations and river engineering. In hydraulics, studies on the friction factor in turbulent regions have been based on the concept of three flow regimes, namely, the fully smooth regime, the fully rough regime, and the transitional regime, since the establishment of the Nikuradze’s chart. However, this study further demonstrates that combining the friction factor with Reynolds number yields a united formula that can scale the entire turbulent region. This formula is derived by investigating the correlation between friction in turbulent pipe flow and its influencing factors, i.e., Reynolds number and relative roughness. In the present study, the formulae of Blasius and Stricklerare modified to rearrange the implicit model of Tao. In addition, we derive a united explicit formula that can compute the friction factor in the entire turbulent regimes based on the asymptotic behavior of the improved Tao’s model. Compared with the reported formulae of Nikuradze, the present formula exhibits higher computational accuracy for the original pipe experiment data of Nikuradze. PMID:27136099

  6. United Formula for the Friction Factor in the Turbulent Region of Pipe Flow.

    PubMed

    Li, Shuolin; Huai, Wenxin

    2016-01-01

    Friction factor is an important element in both flow simulations and river engineering. In hydraulics, studies on the friction factor in turbulent regions have been based on the concept of three flow regimes, namely, the fully smooth regime, the fully rough regime, and the transitional regime, since the establishment of the Nikuradze's chart. However, this study further demonstrates that combining the friction factor with Reynolds number yields a united formula that can scale the entire turbulent region. This formula is derived by investigating the correlation between friction in turbulent pipe flow and its influencing factors, i.e., Reynolds number and relative roughness. In the present study, the formulae of Blasius and Stricklerare modified to rearrange the implicit model of Tao. In addition, we derive a united explicit formula that can compute the friction factor in the entire turbulent regimes based on the asymptotic behavior of the improved Tao's model. Compared with the reported formulae of Nikuradze, the present formula exhibits higher computational accuracy for the original pipe experiment data of Nikuradze. PMID:27136099

  7. Comprehensive tire-road friction coefficient estimation based on signal fusion method under complex maneuvering operations

    NASA Astrophysics Data System (ADS)

    Li, L.; Yang, K.; Jia, G.; Ran, X.; Song, J.; Han, Z.-Q.

    2015-05-01

    The accurate estimation of the tire-road friction coefficient plays a significant role in the vehicle dynamics control. The estimation method should be timely and reliable for the controlling requirements, which means the contact friction characteristics between the tire and the road should be recognized before the interference to ensure the safety of the driver and passengers from drifting and losing control. In addition, the estimation method should be stable and feasible for complex maneuvering operations to guarantee the control performance as well. A signal fusion method combining the available signals to estimate the road friction is suggested in this paper on the basis of the estimated ones of braking, driving and steering conditions individually. Through the input characteristics and the states of the vehicle and tires from sensors the maneuvering condition may be recognized, by which the certainty factors of the friction of the three conditions mentioned above may be obtained correspondingly, and then the comprehensive road friction may be calculated. Experimental vehicle tests validate the effectiveness of the proposed method through complex maneuvering operations; the estimated road friction coefficient based on the signal fusion method is relatively timely and accurate to satisfy the control demands.

  8. Environmental Engineering Unit Operations and Unit Processes Laboratory Manual.

    ERIC Educational Resources Information Center

    O'Connor, John T., Ed.

    This manual was prepared for the purpose of stimulating the development of effective unit operations and unit processes laboratory courses in environmental engineering. Laboratory activities emphasizing physical operations, biological, and chemical processes are designed for various educational and equipment levels. An introductory section reviews…

  9. Friction and wear behaviors of compacted graphite iron with different biomimetic units fabricated by laser cladding

    NASA Astrophysics Data System (ADS)

    Sun, Na; Shan, Hongyu; Zhou, Hong; Chen, Darong; Li, Xiaoyan; Xia, Wen; Ren, Luquan

    2012-07-01

    Mimicking the biological characters on the cuticles of pangolin scales, biomimetic units were fabricated on the surfaces of compacted graphite cast iron (CGI) with different unit materials using laser cladding process. The influences of various unit materials including TiC, WC, B4C and Al2O3 powders on the friction and wear behaviors of CGI were investigated. The wear resistance mechanism of biomimetic specimens was discussed. The results indicated that the wear resistance of biomimetic specimens cladding TiC was the best; the specimens cladding WC or B4C were in the middle; and the specimens cladding Al2O3 was the worst. The sequence of friction coefficient values of biomimetic specimens cladding different ceramic powders from high to low was B4C, TiC, WC and Al2O3. The wear mechanism of untreated specimen was mainly adhesion wear, abrasive wear as well as the oxidation wear, whereas the adhesive wear and abrasive wear was the main wear mechanism of the regions of substrate in biomimetic specimens and slight adhesion, abrasive wear and fatigue wear on the regions of biomimetic units.

  10. Method for producing ceramic composition having low friction coefficient at high operating temperatures

    DOEpatents

    Lankford, Jr., James

    1988-01-01

    A method for producing a stable ceramic composition having a surface with a low friction coefficient and high wear resistance at high operating temperatures. A first deposition of a thin film of a metal ion is made upon the surface of the ceramic composition and then a first ion implantation of at least a portion of the metal ion is made into the near surface region of the composition. The implantation mixes the metal ion and the ceramic composition to form a near surface composite. The near surface composite is then oxidized sufficiently at high oxidizing temperatures to form an oxide gradient layer in the surface of the ceramic composition.

  11. Factors controlling threshold friction velocity in semiarid and arid areas of the United States

    USGS Publications Warehouse

    Marticorena, Beatrice; Bergametti, G.; Belnap, Jayne

    1997-01-01

    A physical model was developed to explain threshold friction velocities u*t for particles of the size 60a??120 I?m lying on a rough surface in loose soils for semiarid and arid parts of the United States. The model corrected for the effect of momentum absorption by the nonerodible roughness. For loose or disturbed soils the most important parameter that controls u*t is the aerodynamic roughness height z 0. For physical crusts damaged by wind the size of erodible crust pieces is important along with the roughness. The presence of cyanobacteriallichen soil crusts roughens the surface, and the biological fibrous growth aggregates soil particles. Only undisturbed sandy soils and disturbed soils of all types would be expected to be erodible in normal wind storms. Therefore disturbance of soils by both cattle and humans is very important in predicting wind erosion as confirmed by our measurements.

  12. Soil runway friction evaluation in support of USAF C-17 transport aircraft operations

    NASA Technical Reports Server (NTRS)

    Yager, Thomas J.

    1995-01-01

    A series of NASA Diagonal-Braked Vehicle (DBV) test runs were performed on the soil runway 7/25 at Holland landing zone, Fort Bragg, North Carolina, near Pope Air Force Base in March 1995 at the request of the Air Force C-17 System Program Office. These ground vehicle test results indicated that the dry runway friction level was suitable for planned C-17 transport aircraft landing and take-off operations at various gross weights. These aircraft operations were successfully carried out. On-board aircraft deceleration measurements were comparable to NASA DBV measurements. Additional tests conducted with an Army High Mobility Multi-Purpose Wheeled Vehicle equipped with a portable decelerometer, showed good agreement with NASA DBV data.

  13. Influence of friction forces on the motion of VTOL aircraft during landing operations on ships at sea

    NASA Technical Reports Server (NTRS)

    Howard, J. C.; Chin, D. O.

    1981-01-01

    Equations describing the friction forces generated during landing operations on ships at sea were formulated. These forces depend on the platform reaction and the coefficient of friction. The platform reaction depends on the relative sink rate and the shock absorbing capability of the landing gear. The friction coefficient varies with the surface condition of the landing platform and the angle of yaw of the aircraft relative to the landing platform. Landings by VTOL aircraft, equipped with conventional oleopneumatic landing gears are discussed. Simplifications are introduced to reduce the complexity of the mathematical description of the tire and shock strut characteristics. Approximating the actual complicated force deflection characteristic of the tire by linear relationship is adequate. The internal friction forces in the shock strut are included in the landing gear model. A set of relatively simple equations was obtained by including only those tire and shock strut characteristics that contribute significantly to the generation of landing gear forces.

  14. Unpacking Referent Units in Fraction Operations

    ERIC Educational Resources Information Center

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  15. Multi-robot operator control unit

    NASA Astrophysics Data System (ADS)

    Powell, D.; Gilbreath, G.; Bruch, M.

    2006-05-01

    Space and Naval Warfare Systems Center, San Diego (SSC San Diego) has developed an unmanned vehicle and sensor operator control interface capable of simultaneously controlling and monitoring multiple sets of heterogeneous systems. The modularity, scalability and flexible user interface of the Multi-robot Operator Control Unit (MOCU) accommodates a wide range of vehicles and sensors in varying mission scenarios. MOCU currently controls all of the SSC San Diego developmental vehicles (land, air, sea, and undersea), including the SPARTAN Advanced Concept Technology Demonstration (ACTD) Unmanned Surface Vehicle (USV), the iRobot PackBot, and the Family of Integrated Rapid Response Equipment (FIRRE) vehicles and sensors. This paper will discuss how software and hardware modularity has allowed SSC San Diego to create a single operator control unit (OCU) with the capability to control a wide variety of unmanned systems.

  16. 200-UP-2 operable unit radiological surveys

    SciTech Connect

    Wendling, M.A.

    1994-04-30

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil.

  17. 30 CFR 77.301 - Dryer heating units; operation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Dryer heating units; operation. 77.301 Section... MINES Thermal Dryers § 77.301 Dryer heating units; operation. (a) Dryer heating units shall be operated...) Dryer heating units which are fired by pulverized coal, shall be operated and maintained in...

  18. 30 CFR 77.301 - Dryer heating units; operation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Dryer heating units; operation. 77.301 Section... MINES Thermal Dryers § 77.301 Dryer heating units; operation. (a) Dryer heating units shall be operated...) Dryer heating units which are fired by pulverized coal, shall be operated and maintained in...

  19. 30 CFR 77.301 - Dryer heating units; operation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Dryer heating units; operation. 77.301 Section... MINES Thermal Dryers § 77.301 Dryer heating units; operation. (a) Dryer heating units shall be operated...) Dryer heating units which are fired by pulverized coal, shall be operated and maintained in...

  1. 30 CFR 77.301 - Dryer heating units; operation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Dryer heating units; operation. 77.301 Section... MINES Thermal Dryers § 77.301 Dryer heating units; operation. (a) Dryer heating units shall be operated...) Dryer heating units which are fired by pulverized coal, shall be operated and maintained in...

  2. 30 CFR 77.301 - Dryer heating units; operation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Dryer heating units; operation. 77.301 Section... MINES Thermal Dryers § 77.301 Dryer heating units; operation. (a) Dryer heating units shall be operated...) Dryer heating units which are fired by pulverized coal, shall be operated and maintained in...

  3. NIC atomic operation unit with caching and bandwidth mitigation

    DOEpatents

    Hemmert, Karl Scott; Underwood, Keith D.; Levenhagen, Michael J.

    2016-03-01

    A network interface controller atomic operation unit and a network interface control method comprising, in an atomic operation unit of a network interface controller, using a write-through cache and employing a rate-limiting functional unit.

  4. Offshore desulfurization unit permits gas lift operations

    SciTech Connect

    Cabes, A.; Elgue, J.; Tournier-Lasserve, J. )

    1992-01-13

    This paper reports on the installation of a desulfurization unit for the Tchibouela oil field, offshore Congo, which allowed produced low-pressure associated gas containing CO{sub 2} to be kept for gas lift operations while, for safety reasons, the large volume of H{sub 2}S at low pressure was removed prior to compression. Since October 1989, the world's first offshore amine sweetening unit has worked satisfactorily and continues to prove that it is an attractive production alternative. For desulfurization, a selective methyldiethanolamine (MDEA) process, developed by Elf Aquitaine, was chosen because it was the only process that met the required specifications at a low pressure of 3.5 bar (51 psi).

  5. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    NASA Technical Reports Server (NTRS)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  6. Triboplasma - the main component of plasma-chemical processes occurring in the friction units of machines and mechanisms in the presence of these drugs Tribo

    NASA Astrophysics Data System (ADS)

    Kashapov, N. F.; Sharifullin, S. N.

    2015-06-01

    In this paper, a technology capable of repairing worn surfaces of the friction units of machines and mechanisms. This technology can successfully be used in any production of engineering products. The proposed technology is low-cost, efficient and easy to use. It is shown that the processes occurring in the friction units of machines and mechanisms in the presence of these drugs tribo triboplasma plays a fundamental role, which arises in the contact mating surfaces.

  7. Friction evaluation of unpaved, gypsum-surface runways at Northrup Strip, White Sands Missile Range, in support of Space Shuttle Orbiter landing and retrieval operations

    NASA Technical Reports Server (NTRS)

    Yager, T. J.; Horne, W. B.

    1980-01-01

    Friction measurement results obtained on the gypsum surface runways at Northrup Strip, White Sands Missile Range, N. M., using an instrumented tire test vehicle and a diagonal braked vehicle, are presented. These runways were prepared to serve as backup landing and retrieval sites to the primary sites located at Dryden Flight Research Center for shuttle orbiter during initial test flights. Similar friction data obtained on paved and other unpaved surfaces was shown for comparison and to indicate that the friction capability measured on the dry gypsum surface runways is sufficient for operations with the shuttle orbiter and the Boeing 747 aircraft. Based on these ground vehicle friction measurements, estimates of shuttle orbiter and aircraft tire friction performance are presented and discussed. General observations concerning the gypsum surface characteristics are also included and several recommendations are made for improving and maintaining adequate surface friction capabilities prior to the first shuttle orbiter landing.

  8. Higher-Order Thinking in the Unit Operations Laboratory.

    ERIC Educational Resources Information Center

    Miller, Ronald L.; Ely, James F.; Baldwin, Robert M.; Olds, Barbara M.

    1998-01-01

    Argues that the unit operations laboratory provides an ideal setting to help chemical engineering students become better engineering practitioners. Describes a summer program at the Colorado School of Mines that incorporates experience into a unit operations laboratory. (DDR)

  9. Analysis of operation of new construction of the frictional joint with the resistance wedge / Analiza pracy nowej konstrukcji złącza ciernego z klinem oporowym

    NASA Astrophysics Data System (ADS)

    Brodny, Jarosław

    2012-10-01

    Frictional joint is the basic part of the friction props and yielding steel frames of dog headings. It constitutes a constructional connection and have decisive influence on the basic operational parameters of the steel frames and props, i.e. their loading capacity and yielding capacity. Currently applied constructions of frictional joints characterize with low loading capacity and unstable operation. In order to improve their operational parameters a new constructional solution of frictional joint, consisting on the application of resistance wedge assembled between the cooperating sections, was developed. Application of the resistance wedge caused an increase of resistances to motion in the frictional joint, what influenced on the increase of its loading capacity and on the increase of values of axial forces in the bolts of stirrups. In the paper results of stand tests of frictional joints with the resistance wedge, subjected to the static axial compression and impact of freely falling mass, were presented. In order to determine the influence of the resistance wedge on the operational parameters of the frictional joint, obtained results were compared with the results of studies of the frictional joints without the resistance wedge. On the basis of stand tests a physical and mathematical models of the frictional joint with the resistance wedge, were developed, and utilized to simulation analysis of its operation at impulse loading. On the basis of conducted tests and analysis one can state, that application of the resistance wedge influences on the enhancement of loading capacity, improves the state of loading the bolts in stirrups, and creates possibility of regulation of operational characteristics of the frictional joints

  10. 21 CFR 872.6640 - Dental operative unit and accessories.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that...

  11. 21 CFR 872.6640 - Dental operative unit and accessories.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that...

  12. 21 CFR 872.6640 - Dental operative unit and accessories.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that...

  13. 21 CFR 872.6640 - Dental operative unit and accessories.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that...

  14. 21 CFR 872.6640 - Dental operative unit and accessories.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that...

  15. 200-BP-5 operable unit treatability test report

    SciTech Connect

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  16. Impact of High Wind Power Penetration on Hydroelectric Unit Operations

    SciTech Connect

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-01-01

    The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

  17. 27 CFR 24.147 - Operations bond or unit bond.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Operations bond or unit bond. 24.147 Section 24.147 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS WINE Establishment and Operations Bonds and Consents of Surety § 24.147 Operations bond or unit...

  18. Is internal friction friction?

    USGS Publications Warehouse

    Savage, J.C.; Byerlee, J.D.; Lockner, D.A.

    1996-01-01

    Mogi [1974] proposed a simple model of the incipient rupture surface to explain the Coulomb failure criterion. We show here that this model can plausibly be extended to explain the Mohr failure criterion. In Mogi's model the incipient rupture surface immediately before fracture consists of areas across which material integrity is maintained (intact areas) and areas across which it is not (cracks). The strength of the incipient rupture surface is made up of the inherent strength of the intact areas plus the frictional resistance to sliding offered by the cracked areas. Although the coefficient of internal friction (slope of the strength versus normal stress curve) depends upon both the frictional and inherent strengths, the phenomenon of internal friction can be identified with the frictional part. The curvature of the Mohr failure envelope is interpreted as a consequence of differences in damage (cracking) accumulated in prefailure loading at different confining pressures.

  19. Incorporating Safety into a Unit Operations Laboratory Course.

    ERIC Educational Resources Information Center

    King, Julia A.

    1998-01-01

    Details the incorporation of safety procedures and issues into the curriculum of an undergraduate chemical engineering unit operations laboratory course. Includes checklists and sample reporting forms. (DDR)

  20. Sanitary Engineering Unit Operations and Unit Processes Laboratory Manual.

    ERIC Educational Resources Information Center

    American Association of Professors in Sanitary Engineering.

    This manual contains a compilation of experiments in Physical Operations, Biological and Chemical Processes for various education and equipment levels. The experiments are designed to be flexible so that they can be adapted to fit the needs of a particular program. The main emphasis is on hands-on student experiences to promote understanding.…

  1. Operations: A Comparative Study of the United States and Taiwan

    ERIC Educational Resources Information Center

    Lin, Cheng-Yao; Becker, Jerry; Byun, Mi-Ran; Yang, Der-Ching; Huang, Tsai-Wei

    2013-01-01

    This study examined (a) the differences in preservice teachers’ procedural knowledge in four areas of fraction operations in Taiwan and the United States, (b) the differences in preservice teachers’ conceptual knowledge in four areas of fraction operations in Taiwan and the United States, and (c) correlation in preservice teachers’ conceptual…

  2. PARTICULATE CONTROL MOBILE TEST UNITS: SECOND YEAR'S OPERATION

    EPA Science Inventory

    The report summarizes the second year's operation of EPA-owned mobile test units. Unit use divides into two principal areas: (1) three units (baghouse, electrostatic precipitator (ESP), and wet scrubber) are designed for use in the field to study the applicability of different me...

  3. Unit costs of waste management operations

    SciTech Connect

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

  4. Study on safety operation for large hydroelectric generator unit

    NASA Astrophysics Data System (ADS)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  5. Models of unit operations used for solid-waste processing

    SciTech Connect

    Savage, G.M.; Glaub, J.C.; Diaz, L.F.

    1984-09-01

    This report documents the unit operations models that have been developed for typical refuse-derived-fuel (RDF) processing systems. These models, which represent the mass balances, energy requirements, and economics of the unit operations, are derived, where possible, from basic principles. Empiricism has been invoked where a governing theory has yet to be developed. Field test data and manufacturers' information, where available, supplement the analytical development of the models. A literature review has also been included for the purpose of compiling and discussing in one document the available information pertaining to the modeling of front-end unit operations. Separate analytics have been done for each task.

  6. Nuclear unit operating experience: 1985-1986 update: Final report

    SciTech Connect

    LeShay, D.W.; Koppe, R.H.; Olson, E.A.J.

    1987-12-01

    This report presents results of a project conducted by the S.M. Stoller Corporation for EPRI. The purpose of the project was to analyze the operational experience of nuclear units within the United States during the calendar years 1985 through 1986 using the Operating Plant Evaluation Code (OPEC-2) System and other available sources of operational data. The report updates and supplements previous EPRI reports NP-1191, NP-2092, NP-3480, and NP-4368. The overall performances of US nuclear units and the availability and capacity factor losses for the constituent systems and components are presented. The problem areas which have impacted most significantly on nuclear unit performance during 1985 to 1986 are discussed in detail. Forced outage rates and scram rates are also investigated. The 92 domestic nuclear units which were considered in this report inlcude all units which are rated 400 MW(e) or greater. Three Mile Island 2 was excluded from all analyses of this report. The performances of BWRs and PWRs in the United States during 1985 through 1986 were compared with similar units operating in foreign countries.

  7. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    SciTech Connect

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  8. 27 CFR 24.147 - Operations bond or unit bond.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... or contiguous distilled spirits plant qualified under 27 CFR part 19 for the production of distilled... amended, give an operations bond or unit bond in accordance with the applicable provisions of 27 CFR part... BUREAU, DEPARTMENT OF THE TREASURY LIQUORS WINE Establishment and Operations Bonds and Consents of...

  9. 27 CFR 24.147 - Operations bond or unit bond.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... amended, give an operations bond or unit bond in accordance with the applicable provisions of 27 CFR part... or contiguous distilled spirits plant qualified under 27 CFR part 19 for the production of distilled... 27 Alcohol, Tobacco Products and Firearms 1 2011-04-01 2011-04-01 false Operations bond or...

  10. Feasibility study report for the 200-BP-1 operable unit

    SciTech Connect

    Not Available

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  11. 200-UP-2 Operable Unit technical baseline report

    SciTech Connect

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO{sub 3}) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO{sub 3} Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab.

  12. Integrated Ground Operations Demonstration Units Testing Plans and Status

    NASA Technical Reports Server (NTRS)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  13. 43 CFR 3137.131 - What happens if the unit terminated before the unit operator met the initial development...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the unit operator met the initial development obligations? 3137.131 Section 3137.131 Public Lands... before the unit operator met the initial development obligations? If the unit terminated before the unit operator met the initial development obligations, BLM's approval of the unit agreement is revoked. You,...

  14. 43 CFR 3137.131 - What happens if the unit terminated before the unit operator met the initial development...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the unit operator met the initial development obligations? 3137.131 Section 3137.131 Public Lands... before the unit operator met the initial development obligations? If the unit terminated before the unit operator met the initial development obligations, BLM's approval of the unit agreement is revoked. You,...

  15. 43 CFR 3137.131 - What happens if the unit terminated before the unit operator met the initial development...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the unit operator met the initial development obligations? 3137.131 Section 3137.131 Public Lands... before the unit operator met the initial development obligations? If the unit terminated before the unit operator met the initial development obligations, BLM's approval of the unit agreement is revoked. You,...

  16. 43 CFR 3137.131 - What happens if the unit terminated before the unit operator met the initial development...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the unit operator met the initial development obligations? 3137.131 Section 3137.131 Public Lands... before the unit operator met the initial development obligations? If the unit terminated before the unit operator met the initial development obligations, BLM's approval of the unit agreement is revoked. You,...

  17. Limited field investigation for the 200-UP-1 operable unit

    SciTech Connect

    1996-11-01

    The 200-UP-1 Groundwater Operable Unit is located in the southern portion of the 200 West Area on the Hanford Site in Washington State. The operable unit is located adjacent to the 200-ZP-1 Groundwater Operable Unit and underlies a significant part of seven source operable units: 200-RO-1, 200-RO-2, 200-RO-3, 200-RO-4, 200-SS-2, 200-UP-2, and 200-UP-3. Remedial efforts in the 100-ZP-1 Operable Unit focus on addressing volatile organic contamination in the aquifer. The focus of the 200-UP-1 limited field investigation (LFI) is on contaminated aquifer soils and groundwater within its boundary, with the exception of uranium and technetium-99 plumes, which are addressed by an existing 200-UP-1 interim remedial measure (IRM). The LFI approach is driven by general and specific data needs required to refine the site conceptual model and conduct a risk assessment. Activities supporting the LFI include drilling, well construction, sampling and analysis, data validation, geologic and geophysical logging, aquifer testing, measuring depth to water, and evaluating geodetic survey and existing analytical data.

  18. 3. Unit 4 Turbine Pit Shaft and Operating Ring, view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Unit 4 Turbine Pit Shaft and Operating Ring, view to the northeast. One of the servo motor housings is visible in the right background of the photograph. Notice the wicket gate linkage greasing tubes along the top of the operating ring. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  19. 15. Potential Transformer for Unit 2 and Operating Floor Front ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Potential Transformer for Unit 2 and Operating Floor Front Corridor, view to the east-southeast. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  20. 15 CFR 0.735-33 - Operating units.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Operating units. 0.735-33 Section 0.735-33 Commerce and Foreign Trade Office of the Secretary of Commerce EMPLOYEE RESPONSIBILITIES AND... Administration); (c) Certain provisions of the Defense Production Act of 1950, e.g., 50 U.S.C. App....

  1. 7 CFR 636.19 - Access to operating unit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Access to operating unit. 636.19 Section 636.19 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVES PROGRAM § 636.19 Access...

  2. Unit Operation Experiment Linking Classroom with Industrial Processing

    ERIC Educational Resources Information Center

    Benson, Tracy J.; Richmond, Peyton C.; LeBlanc, Weldon

    2013-01-01

    An industrial-type distillation column, including appropriate pumps, heat exchangers, and automation, was used as a unit operations experiment to provide a link between classroom teaching and real-world applications. Students were presented with an open-ended experiment where they defined the testing parameters to solve a generalized problem. The…

  3. An Automated Distillation Column for the Unit Operations Laboratory

    ERIC Educational Resources Information Center

    Perkins, Douglas M.; Bruce, David A.; Gooding, Charles H.; Butler, Justin T.

    2005-01-01

    A batch distillation apparatus has been designed and built for use in the undergraduate unit operations laboratory course. The column is fully automated and is accompanied by data acquisition and control software. A mixture of 1­-propanol and 2-­propanol is separated in the column, using either a constant distillate rate or constant composition…

  4. 7 CFR 631.22 - Access to operating unit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Access to operating unit. 631.22 Section 631.22 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Miscellaneous §...

  5. 7 CFR 631.22 - Access to operating unit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Access to operating unit. 631.22 Section 631.22 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Miscellaneous §...

  6. 7 CFR 631.22 - Access to operating unit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Access to operating unit. 631.22 Section 631.22 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Miscellaneous §...

  7. 7 CFR 631.22 - Access to operating unit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Access to operating unit. 631.22 Section 631.22 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Miscellaneous §...

  8. Implementation and Analysis of Hemodialysis in the Unit Operations Laboratory

    ERIC Educational Resources Information Center

    Madihally, Sundararajan V.; Lewis, Randy S.

    2007-01-01

    To enhance bioengineering in the chemical engineering curriculum, a Unit Operations experiment simulating the hemodialysis of creatinine was implemented. The blood toxin creatinine was used for developing a more realistic dialysis experiment. A dialysis model is presented that allows students to assess the validity of model assumptions. This work…

  9. The Development and Deployment of a Virtual Unit Operations Laboratory

    ERIC Educational Resources Information Center

    Vaidyanath, Sreeram; Williams, Jason; Hilliard, Marcus; Wiesner, Theodore

    2007-01-01

    Computer-simulated experiments offer many benefits to engineering curricula in the areas of safety, cost, and flexibility. We report our experience in developing and deploying a computer-simulated unit operations laboratory, driven by the guiding principle of maximum fidelity to the physical lab. We find that, while the up-front investment in…

  10. Semiconductor Chemical Reactor Engineering and Photovoltaic Unit Operations.

    ERIC Educational Resources Information Center

    Russell, T. W. F.

    1985-01-01

    Discusses the nature of semiconductor chemical reactor engineering, illustrating the application of this engineering with research in physical vapor deposition of cadmium sulfide at both the laboratory and unit operations scale and chemical vapor deposition of amorphous silicon at the laboratory scale. (JN)

  11. Adaptation of Professional Skills in the Unit Operations Laboratory

    ERIC Educational Resources Information Center

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  12. Community-Based Presentations in the Unit Operations Laboratory

    ERIC Educational Resources Information Center

    Mitchell, Brian S.; Law, Victor J.

    2005-01-01

    A method for incorporating community­-based oral presentations into the undergraduate chemical engineering unit operations laboratory experience is described. Examples are given of appropriate topics and how these presentations can be incorporated into the experiment sequence. Course evaluations reflect the fact that these presentations are an…

  13. Friction plug welding

    NASA Technical Reports Server (NTRS)

    Takeshita, Riki (Inventor); Hibbard, Terry L. (Inventor)

    2001-01-01

    Friction plug welding (FPW) usage is advantageous for friction stir welding (FSW) hole close-outs and weld repairs in 2195 Al--Cu--Li fusion or friction stir welds. Current fusion welding methods of Al--Cu--Li have produced welds containing varied defects. These areas are found by non-destructive examination both after welding and after proof testing. Current techniques for repairing typically small (<0.25) defects weaken the weldment, rely heavily on welders' skill, and are costly. Friction plug welding repairs increase strength, ductility and resistance to cracking over initial weld quality, without requiring much time or operator skill. Friction plug welding while pulling the plug is advantageous because all hardware for performing the weld can be placed on one side of the workpiece.

  14. Utilities optimize operations by cycling base-load fossil units

    SciTech Connect

    Not Available

    1986-05-01

    In the summer of 1985, an East Coast utility ''gave away'' approximately 200 MW of electricity. The utility found itself having to operate, at full capability, a 400-MW, 20-yr-old fossil station when its power pool had requested only half that load. The power went into the network and was sold, but another member of the pool got the credit. This situation developed because the utility had two stations it had to operate in the base-load mode: One was brand new, the other could operate economically only at full capacity. This predicament is becoming commonplace for many utilities with one or more base-load units that have recently come on-line. Utilities are using their older fossil units to satisfy generating capacity at these peak-demand periods by introducing them to cyclic operation. For example, in 1987, when Duke Power Co's Catawba 2 nuclear station is scheduled for commercial operation, approximately 50% of the utility's system will be base-load nuclear generation. During periods of low system demand, Duke's larger fossil units will be required either to attain sufficiently low loads or to cycle on and off daily to meet system dispatch requirements. A figure shows how Duke's fossil units will have to meet daily demand projected for the sumer of 1988. Of course, cycling a fossil plant does not involve simply turning the boiler off at 5 p.m. and switching it on again at 9 a.m. This action creates stress on equipment that can lead to severe availability problems. Utilities that opt to cycle all or some of their units do so only after careful analysis. This article describes the more serious problems associated with it.

  15. Centrifugal microfluidic platforms: advanced unit operations and applications.

    PubMed

    Strohmeier, O; Keller, M; Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N

    2015-10-01

    Centrifugal microfluidics has evolved into a mature technology. Several major diagnostic companies either have products on the market or are currently evaluating centrifugal microfluidics for product development. The fields of application are widespread and include clinical chemistry, immunodiagnostics and protein analysis, cell handling, molecular diagnostics, as well as food, water, and soil analysis. Nevertheless, new fluidic functions and applications that expand the possibilities of centrifugal microfluidics are being introduced at a high pace. In this review, we first present an up-to-date comprehensive overview of centrifugal microfluidic unit operations. Then, we introduce the term "process chain" to review how these unit operations can be combined for the automation of laboratory workflows. Such aggregation of basic functionalities enables efficient fluidic design at a higher level of integration. Furthermore, we analyze how novel, ground-breaking unit operations may foster the integration of more complex applications. Among these are the storage of pneumatic energy to realize complex switching sequences or to pump liquids radially inward, as well as the complete pre-storage and release of reagents. In this context, centrifugal microfluidics provides major advantages over other microfluidic actuation principles: the pulse-free inertial liquid propulsion provided by centrifugal microfluidics allows for closed fluidic systems that are free of any interfaces to external pumps. Processed volumes are easily scalable from nanoliters to milliliters. Volume forces can be adjusted by rotation and thus, even for very small volumes, surface forces may easily be overcome in the centrifugal gravity field which enables the efficient separation of nanoliter volumes from channels, chambers or sensor matrixes as well as the removal of any disturbing bubbles. In summary, centrifugal microfluidics takes advantage of a comprehensive set of fluidic unit operations such as

  16. Advanced Transport Operating System (ATOPS) control display unit software description

    NASA Technical Reports Server (NTRS)

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  17. BOTUX: Bayesian-like operational taxonomic unit examiner

    PubMed Central

    Koparde, Vishal N.; Adkins, Ricky S.; Fettweis, Jennifer M.; Serrano, Myrna G.; Buck, Gregory A.

    2015-01-01

    Bayesian-like operational taxonomic unit examiner (BOTUX) is a new tool for the classification of 16S rRNA gene sequences into operational taxonomic units (OTUs) that addresses the problem of overestimation caused by errors introduced during PCR amplification and DNA sequencing steps. BOTUX utilises a grammar-based assignment strategy, where Bayesian models are built from each word of a given length (e.g., 8-mers). de novo analysis is possible with BOTUX as it does not require a training set, and updates probabilistic models as new sequences are recruited to an OTU. In benchmarking tests performed with real and simulated datasets of 16S rDNA sequences, BOTUX accurately identifies OTUs with comparable or better clustering efficiency and lower execution times than other OTU algorithms tested. BOTUX is the only OTU classifier, which allows incremental analysis of large datasets, and is also adept in clustering both 454 and Illumina datasets in a reasonable timeframe. PMID:24878725

  18. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    SciTech Connect

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  19. 43 CFR 3283.4 - When may the unit operator add lands to or remove lands from a unit agreement?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false When may the unit operator add lands to or remove lands from a unit agreement? 3283.4 Section 3283.4 Public Lands: Interior Regulations Relating to... add lands to or remove lands from a unit agreement? (a) The unit operator may request BLM to...

  20. 43 CFR 3283.4 - When may the unit operator add lands to or remove lands from a unit agreement?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false When may the unit operator add lands to or remove lands from a unit agreement? 3283.4 Section 3283.4 Public Lands: Interior Regulations Relating to... add lands to or remove lands from a unit agreement? (a) The unit operator may request BLM to...

  1. 43 CFR 3283.4 - When may the unit operator add lands to or remove lands from a unit agreement?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false When may the unit operator add lands to or remove lands from a unit agreement? 3283.4 Section 3283.4 Public Lands: Interior Regulations Relating to... add lands to or remove lands from a unit agreement? (a) The unit operator may request BLM to...

  2. 43 CFR 3283.4 - When may the unit operator add lands to or remove lands from a unit agreement?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false When may the unit operator add lands to or remove lands from a unit agreement? 3283.4 Section 3283.4 Public Lands: Interior Regulations Relating to... add lands to or remove lands from a unit agreement? (a) The unit operator may request BLM to...

  3. Computer simulation of on-orbit manned maneuvering unit operations

    NASA Technical Reports Server (NTRS)

    Stuart, G. M.; Garcia, K. D.

    1986-01-01

    Simulation of spacecraft on-orbit operations is discussed in reference to Martin Marietta's Space Operations Simulation laboratory's use of computer software models to drive a six-degree-of-freedom moving base carriage and two target gimbal systems. In particular, key simulation issues and related computer software models associated with providing real-time, man-in-the-loop simulations of the Manned Maneuvering Unit (MMU) are addressed with special attention given to how effectively these models and motion systems simulate the MMU's actual on-orbit operations. The weightless effects of the space environment require the development of entirely new devices for locomotion. Since the access to space is very limited, it is necessary to design, build, and test these new devices within the physical constraints of earth using simulators. The simulation method that is discussed here is the technique of using computer software models to drive a Moving Base Carriage (MBC) that is capable of providing simultaneous six-degree-of-freedom motions. This method, utilized at Martin Marietta's Space Operations Simulation (SOS) laboratory, provides the ability to simulate the operation of manned spacecraft, provides the pilot with proper three-dimensional visual cues, and allows training of on-orbit operations. The purpose here is to discuss significant MMU simulation issues, the related models that were developed in response to these issues and how effectively these models simulate the MMU's actual on-orbiter operations.

  4. PEBBLES Simulation of Static Friction and New Static Friction Benchmark

    SciTech Connect

    Joshua J. Cogliati; Abderrafi M. Ougouag

    2010-05-01

    Pebble bed reactors contain large numbers of spherical fuel elements arranged randomly. Determining the motion and location of these fuel elements is required for calculating certain parameters of pebble bed reactor operation. This paper documents the PEBBLES static friction model. This model uses a three dimensional differential static friction approximation extended from the two dimensional Cundall and Strack model. The derivation of determining the rotational transformation of pebble to pebble static friction force is provided. A new implementation for a differential rotation method for pebble to container static friction force has been created. Previous published methods are insufficient for pebble bed reactor geometries. A new analytical static friction benchmark is documented that can be used to verify key static friction simulation parameters. This benchmark is based on determining the exact pebble to pebble and pebble to container static friction coefficients required to maintain a stable five sphere pyramid.

  5. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    SciTech Connect

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  6. Reconfigurable ternary optical processor based on row operation unit

    NASA Astrophysics Data System (ADS)

    Kai, SONG; LiPing, YAN

    2015-09-01

    In order to eliminate the difference between the data bits and the pixel bits of the processors in the logic operation of Ternary Optical Computer (TOC), and to make the reconfiguration of the processors more convenient and efficient, while extending the research ideas of TOC, the paper presents a new typical optical component, which is row operation unit (ROU). The features, circuit implementations, and commands for the reconfiguration of ROU are also discussed in detail. On this basis, the reconfigurable ternary optical processor (RTOP) was designed and achieved, which reduces the complexity of the processor management software. Finally, the experiments of reconfigurable ROU are performed, which shows that the principles of RTOP are correct, and all 81 commands for the reconfiguration are effective. Each of the two-input, tri-valued logic operations with thousands of data bits can be concurrently achieved in RTOP.

  7. Method and apparatus for operating an improved thermocline storage unit

    DOEpatents

    Copeland, Robert J.

    1985-01-01

    A method and apparatus for operating a thermocline storage unit in which an insulated barrier member is provided substantially at the interface region between the hot and cold liquids in the storage tank. The barrier member physically and thermally separates the hot and cold liquids substantially preventing any diffusing or mixing between them and substantially preventing any heat transfer therebetween. The barrier member follows the rise and fall of the interface region between the liquids as the tank is charged and discharged. Two methods of maintaining it in the interface region are disclosed. With the structure and operation of the present invention and in particular the significant reduction in diffusing or mixing between the hot and cold liquids as well as the significant reduction in the thermal heat transfer between them, the performance of the storage tank is improved. More specifically, the stability of the interface region or thermocline is enhanced and the thickness of the thermocline is reduced producing a corresponding increase in the steepness of the temperature gradient across the thermocline and a more efficiently operating thermocline storage unit.

  8. Method and apparatus for operating an improved thermocline storage unit

    DOEpatents

    Copeland, R.J.

    1982-09-30

    A method and apparatus for operating a thermocline storage unit in which an insulated barrier member is provided substantially at the interface region between the hot and cold liquids in the storage tank. The barrier member physically and thermally separates the hot and cold liquids substantially preventing any diffusing or mixing between them and substantially preventing any heat transfer there between. The barrier member follows the rise and fall of the interface region between the liquids as the tank is charged and discharged. Two methods of maintaining it in the interface region are disclosed. With the structure and operation of the present invention and in particular the significant reduction in diffusing or mixing between the hot and cold liquids as well as the significant reduction in the thermal heat transfer between them, the performance of the storage tank is improved. More specifically, the stability of the interface region or thermocline is enhanced and the thickness of the thermocline is reduced producing a corresponding increase in the steepness of the temperature gradient across the thermocline and a more efficiently operating thermocline storage unit.

  9. The United States national volcanic ash operations plan for aviation

    USGS Publications Warehouse

    Albersheim, Steven; Guffanti, Marianne

    2009-01-01

    Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.

  10. The design and orbital operation of Space Flyer Unit

    NASA Astrophysics Data System (ADS)

    Kuriki, K.; Ninomiya, K.; Nagatomo, M.; Tsuya, N.; Kawachi, M.; Ijichi, K.; Kimura, H.

    The Space Flyer Unit is a retrievable and re-usable multipurpose platform. The first SFU mission (SFU-1) will be launched by Japanese H-II rocket and retrieved by the United States Space Shuttle. SFU system consists of the core system and payloads. The core system provides standardized interfaces and services for payload integration and operation. The core system is reusable with proper post mission maintenances. Electrical furnaces for material processing, technology development experiments such as two-dimensionally deployable mechanism, electric propulsion experiment, a partial model of Japanese Experiment Module of the Space Station and a space infrared telescope are among the payloads of SFU-1. In addition to ground based system, SFU will be equipped with an onboard navigation and guidance system which will be used for the rendezvous with Space Shuttle. The SFU-1 launch date is targeted for the first quarter of 1994 and retrieved after several months of operation in orbit. The brief description of the core system and the in-orbit operation, emphasized on retrieval phase, will be presented in this paper.

  11. Article separation apparatus and method for unit operations

    SciTech Connect

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  12. Feasibility Study for Operable Unit 7-13/14

    SciTech Connect

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  13. CTS (Hermes): United States experiments and operations summary

    NASA Technical Reports Server (NTRS)

    Donoughe, P. L.; Hunczak, H. R.

    1977-01-01

    The Communications Technology Satellite, launched in January 1976 and embodying the highest power transmitter in a communications satellite, was considered. As a joint program between the U.S. and Canada, close coordination of the two countries was necessitated since the management and control of experiments were done in real time. Criteria used by NASA for acceptance of the United States experiments are noted and acceptance procedures are discussed. The category for each accepted experiment is given. The modus operandi employed for the U.S. experiments in the areas of management, coordination, liaison, and real time operation are described. Some of the highlights associated with satellite utilization are given.

  14. Friction welding.

    NASA Technical Reports Server (NTRS)

    Moore, T. J.

    1972-01-01

    Results of an exploratory study of the structure and properties of friction welds in Udimet 700 (U-700) and TD-nickel (TD-Ni) bar materials, as well as dissimilar U-700/TD-Ni friction welds. Butt welds were prepared by friction welding 12.7-mm-diam U-700 bars and TD-Ni bars. Specimens for elevated temperature tensile and stress rupture testing were machined after a postweld heat treatment. Friction welding of U-700 shows great potential because the welds were found to be as strong as the parent metal in stress rupture and tensile tests at 760 and 980 C. In addition, the weld line was not detectable by metallographic examination after postheating. Friction welds in TD-Ni or between U-700 and TD-Ni were extremely weak at elevated temperatures. The TD-Ni friction welds could support only 9% as much stress as the base metal for 10-hour stress rupture life at 1090 C. The U-700/TD-Ni weld could sustain only 15% as much stress as the TD-Ni parent metal for a 10-hour stress rupture life at 930 C. Thus friction welding is not a suitable joining method for obtaining high-strength TD-Ni or U-700/TD-Ni weldments.

  15. 43 CFR 3284.8 - May a unit have multiple operators?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false May a unit have multiple operators? 3284.8 Section 3284.8 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Operations § 3284.8 May a unit have multiple operators? A unit may have only one operator....

  16. 43 CFR 3284.8 - May a unit have multiple operators?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false May a unit have multiple operators? 3284.8 Section 3284.8 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Operations § 3284.8 May a unit have multiple operators? A unit may have only one operator....

  17. 43 CFR 3284.8 - May a unit have multiple operators?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false May a unit have multiple operators? 3284.8 Section 3284.8 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Operations § 3284.8 May a unit have multiple operators? A unit may have only one operator....

  18. 43 CFR 3284.8 - May a unit have multiple operators?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false May a unit have multiple operators? 3284.8 Section 3284.8 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Operations § 3284.8 May a unit have multiple operators? A unit may have only one operator....

  19. Joint Winter Runway Friction Program Accomplishments

    NASA Technical Reports Server (NTRS)

    Yager, Thomas J.; Wambold, James C.; Henry, John J.; Andresen, Arild; Bastian, Matthew

    2002-01-01

    The major program objectives are: (1) harmonize ground vehicle friction measurements to report consistent friction value or index for similar contaminated runway conditions, for example, compacted snow, and (2) establish reliable correlation between ground vehicle friction measurements and aircraft braking performance. Accomplishing these objectives would give airport operators better procedures for evaluating runway friction and maintaining acceptable operating conditions, providing pilots information to base go/no go decisions, and would contribute to reducing traction-related aircraft accidents.

  20. Simplified programming and control of automated radiosynthesizers through unit operations

    PubMed Central

    2013-01-01

    Background Many automated radiosynthesizers for producing positron emission tomography (PET) probes provide a means for the operator to create custom synthesis programs. The programming interfaces are typically designed with the engineer rather than the radiochemist in mind, requiring lengthy programs to be created from sequences of low-level, non-intuitive hardware operations. In some cases, the user is even responsible for adding steps to update the graphical representation of the system. In light of these unnecessarily complex approaches, we have created software to perform radiochemistry on the ELIXYS radiosynthesizer with the goal of being intuitive and easy to use. Methods Radiochemists were consulted, and a wide range of radiosyntheses were analyzed to determine a comprehensive set of basic chemistry unit operations. Based around these operations, we created a software control system with a client–server architecture. In an attempt to maximize flexibility, the client software was designed to run on a variety of portable multi-touch devices. The software was used to create programs for the synthesis of several 18F-labeled probes on the ELIXYS radiosynthesizer, with [18F]FDG detailed here. To gauge the user-friendliness of the software, program lengths were compared to those from other systems. A small sample group with no prior radiosynthesizer experience was tasked with creating and running a simple protocol. Results The software was successfully used to synthesize several 18F-labeled PET probes, including [18F]FDG, with synthesis times and yields comparable to literature reports. The resulting programs were significantly shorter and easier to debug than programs from other systems. The sample group of naive users created and ran a simple protocol within a couple of hours, revealing a very short learning curve. The client–server architecture provided reliability, enabling continuity of the synthesis run even if the computer running the client software

  1. Multimegabit Operation Multiplexer System. [PCM telemetry unit for space applications

    NASA Technical Reports Server (NTRS)

    Giri, R. R.; Maxwell, M. S.

    1973-01-01

    The Multimegabit Operation Multiplexer System (MOMS) is a high-data-rate PCM telemetry unit capable of sampling and encoding 60 scanning radiometer and four vidicon channels at 250 kilosamples/second and 5 megasamples/second, respectively. This sampling capacity plus the seven-bit quantization requires a total throughput rate of 40 megasamples/second and 280 megabits/second. To produce these rates efficiently, the system was divided into a pair of identical 140-megabit blocks. A low-power 20-MHz analog multiplexer and analog-to-digital converter were developed together with a video sample-and-hold that features an aperture time error of less than 50 psec. Breadboard testing of these basic building blocks confirmed the design prediction that the total system would consume 27 watts of power. Two 140-megabit output parts are suitable for quadriphase modulation.

  2. Corrosion effects on friction factors

    SciTech Connect

    Magleby, H.L.; Shaffer, S.J.

    1996-03-01

    This paper presents the results of NRC-sponsored material specimen tests that were performed to determine if corrosion increases the friction factors of sliding surfaces of motor-operated gate valves, which could require higher forces to close and open safety-related valves when subjected to their design basis differential pressures. Friction tests were performed with uncorroded specimens and specimens subjected to accelerated corrosion. Preliminary tests at ambient conditions showed that corrosion increased the friction factors, indicating the need for additional tests duplicating valve operating parameters at hot conditions. The additional tests showed friction factors of corroded specimens were 0.1 to 0.2 higher than for uncorroded specimens, and that the friction factors of the corroded specimens were not very dependent on contact stress or corrosion film thickness. The measured values of friction factors for the three corrosion films tested (simulating three operating times) were in the range of 0.3 to 0.4. The friction factor for even the shortest simulated operating time was essentially the same as the others, indicating that the friction factors appear to reach a plateau and that the plateau is reached quickly.

  3. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    SciTech Connect

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  4. Applied Meteorology Unit - Operational Contributions to Spaceport Canaveral

    NASA Technical Reports Server (NTRS)

    Bauman, William H., III; Roeder, William P.; Lafosse, Richard A.; Sharp, David W.; Merceret, Francis J.

    2004-01-01

    The Applied Meteorology Unit (AMU) provides technology development, evaluation and transition services to improve operational weather support to the Space Shuttle and the National Space Program. It is established under a Memorandum of Understanding among NASA, the Air Force and the National .Weather Service (NWS). The AMU is funded and managed by NASA and operated by ENSCO, Inc. through a competitively awarded NASA contract. The primary customers are the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS), FL; the Spaceflight Meteorology Group (SMG) at Johnson Space Center (JSC) in Houston, TX; and the NWS office in Melbourne, FL (NWS MLB). This paper will briefly review the AMU's history and describe the three processes through which its work is assigned. Since its inception in 1991 the AMU has completed 72 projects, all of which are listed at the end of this paper. At least one project that highlights each of the three tasking processes will be briefly reviewed. Some of the projects that have been especially beneficial to the space program will also be discussed in more detail, as will projects that developed significant new techniques or science in applied meteorology.

  5. 14 CFR 375.32 - Flights incidental to agricultural and industrial operations outside the United States.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... industrial operations outside the United States. 375.32 Section 375.32 Aeronautics and Space OFFICE OF THE... agricultural and industrial operations outside the United States. Foreign civil aircraft that are engaged in agricultural or industrial operations to be performed wholly outside the United States may be navigated...

  6. 14 CFR 375.32 - Flights incidental to agricultural and industrial operations outside the United States.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... industrial operations outside the United States. 375.32 Section 375.32 Aeronautics and Space OFFICE OF THE... agricultural and industrial operations outside the United States. Foreign civil aircraft that are engaged in agricultural or industrial operations to be performed wholly outside the United States may be navigated...

  7. 14 CFR 375.32 - Flights incidental to agricultural and industrial operations outside the United States.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... industrial operations outside the United States. 375.32 Section 375.32 Aeronautics and Space OFFICE OF THE... agricultural and industrial operations outside the United States. Foreign civil aircraft that are engaged in agricultural or industrial operations to be performed wholly outside the United States may be navigated...

  8. 14 CFR 375.32 - Flights incidental to agricultural and industrial operations outside the United States.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... industrial operations outside the United States. 375.32 Section 375.32 Aeronautics and Space OFFICE OF THE... agricultural and industrial operations outside the United States. Foreign civil aircraft that are engaged in agricultural or industrial operations to be performed wholly outside the United States may be navigated...

  9. 14 CFR 375.32 - Flights incidental to agricultural and industrial operations outside the United States.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... industrial operations outside the United States. 375.32 Section 375.32 Aeronautics and Space OFFICE OF THE... agricultural and industrial operations outside the United States. Foreign civil aircraft that are engaged in agricultural or industrial operations to be performed wholly outside the United States may be navigated...

  10. Enhanced Teaching and Student Learning through a Simulator-Based Course in Chemical Unit Operations Design

    ERIC Educational Resources Information Center

    Ghasem, Nayef

    2016-01-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes…

  11. Friction-Testing Machine

    NASA Technical Reports Server (NTRS)

    Benz, F. J.; Dixon, D. S.; Shaw, R. C.

    1986-01-01

    Testing machine evaluates wear and ignition characteristics of materials in rubbing contact. Offers advantages over other laboratory methods of measuring wear because it simulates operating conditions under which material will actually be used. Machine used to determine wear characteristics, rank and select materials for service with such active oxidizers as oxygen, halogens, and oxides of nitrogen, measure wear characteristics, and determine coefficients of friction.

  12. Aquifer test plan for the 100-HR-3 Operable Unit

    SciTech Connect

    Swanson, L.C.; Hartman, M.J.

    1994-03-28

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues.

  13. Operative Management of Patellar Instability in the United States

    PubMed Central

    Arshi, Armin; Cohen, Jeremiah R.; Wang, Jeffrey C.; Hame, Sharon L.; McAllister, David R.; Jones, Kristofer J.

    2016-01-01

    Background: Treatment of patellofemoral instability has evolved as our understanding of the relevant pathoanatomy has improved. In light of these developments, current practice patterns and management trends have likely changed to reflect these advancements; however, this has not been evaluated in a formal study. Purpose: To determine nationwide patient demographics, surgical trends, and postoperative complications associated with the operative management of patellar instability surgery. Study Design: Descriptive epidemiological study. Methods: A large private-payer database (PearlDiver) comprising patients covered by Humana and United Healthcare insurance policies was retrospectively reviewed using Current Procedural Terminology (CPT) codes to identify patients who underwent surgery for patellar instability. The study cohort was established by querying for patients billed under CPT codes 27420, 27422, or 27427 while satisfying the diagnostic requirement of patellar instability (International Classification of Diseases–9th Revision codes 718.36, 718.86, or 836.3). Patient demographics, surgical trends, concomitant procedures, and postoperative complications were determined. Results: A total of 6190 patients underwent surgical management for patellar instability. Adolescents (age range, 10-19 years) represented 51.5% of cases, and 59.6% were female. The number of patellar instability procedures increased annually over the study period in both the Humana (P = .004, R 2 = 0.76) and United Healthcare (P = .097, R 2 = 0.54) cohorts. The most common concomitant procedures were lateral retinacular release (43.7%), chondroplasty (31.1%), tibial tubercle osteotomy (13.1%), removal of loose bodies (10.5%), osteochondral grafting (9.5%), and microfracture surgery (9.5%). Manipulation under anesthesia was required in 4.6% of patients within 1 year. Patellar fracture within 1 year and infection within 30 days occurred in 2.1% and 1.2% of patients, respectively. Conclusion

  14. Varying duty operation of air-cooled condenser units

    NASA Astrophysics Data System (ADS)

    Milman, O. O.; Kondratev, A. V.; Ptakhin, A. V.; Dunaev, S. N.; Kirjukhin, A. V.

    2016-05-01

    Results of experimental investigations of operation modes of air-cooled condensers (ACC) under design and varying duty conditions are presented. ACCs with varying cooling airflow rates under constant heat load and with constant cooling airflow under varying heat load are examined. Diagrams of heat transfer coefficients and condensation pressures on the heat load and cooling airflow are obtained. It is found that, if the relative heat load is in the range from 0.6 to 1.0 of the nominal value, the ACC heat transfer coefficient varies insignificantly, unlike that of the water-cooled surface condensers. The results of the determination of "zero points" are given, i.e., the attainable pressure in air-cooled condensing units (ACCU), if there is no heat load for several values of working water temperature at the input of water-jet ejectors and liquid ring vacuum pump. The results of the experimental determination of atmospheric air suction into the ACC vacuum system. The effect of additional air suctions in the steam pipe on ACCU characteristics is analyzed. The thermal mapping of ACC heat exchange surfaces from the cooling air inlet is carried out. The dependence of the inefficient heat exchange zone on the additional air suction into the ACC vacuum system is given. It is shown that, if there is no additional air suction into the ACC vacuum system, the inefficient heat exchange zone is not located at the bottom of the first pass tubes, and their portion adjacent to the bottom steam pipe works efficiently. Design procedures for the ACC varying duty of capacitors are presented, and their adequacy for the ACCU varying duty estimation is analyzed.

  15. FOCU:S--future operator control unit: soldier

    NASA Astrophysics Data System (ADS)

    O'Brien, Barry J.; Karan, Cem; Young, Stuart H.

    2009-05-01

    The U.S. Army Research Laboratory's (ARL) Computational and Information Sciences Directorate (CISD) has long been involved in autonomous asset control, specifically as it relates to small robots. Over the past year, CISD has been making strides in the implementation of three areas of small robot autonomy, namely platform autonomy, Soldier-robot interface, and tactical behaviors. It is CISD's belief that these three areas must be considered as a whole in order to provide Soldiers with useful capabilities. In addressing the Soldier-robot interface aspect, CISD has begun development on a unique dismounted controller called the Future Operator Control Unit: Soldier (FOCU:S) that is based on an Apple iPod Touch. The iPod Touch's small form factor, unique touch-screen input device, and the presence of general purpose computing applications such as a web browser combine to give this device the potential to be a disruptive technology. Setting CISD's implementation apart from other similar iPod or iPhone-based devices is the ARL software that allows multiple robotic platforms to be controlled from a single OCU. The FOCU:S uses the same Agile Computing Infrastructure (ACI) that all other assets in the ARL robotic control system use, enabling automated asset discovery on any type of network. Further, a custom ad hoc routing implementation allows the FOCU:S to communicate with the ARL ad hoc communications system and enables it to extend the range of the network. This paper will briefly describe the current robotic control architecture employed by ARL and provide short descriptions of existing capabilities. Further, the paper will discuss FOCU:S specific software developed for the iPod Touch, including unique capabilities enabled by the device's unique hardware.

  16. 43 CFR 3282.2 - When must the unit operator have a participating area approved?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false When must the unit operator have a... RESOURCES UNIT AGREEMENTS Participating Area § 3282.2 When must the unit operator have a participating area approved? You must have an established BLM-approved participating area to allocate production and...

  17. 43 CFR 3282.2 - When must the unit operator have a participating area approved?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false When must the unit operator have a... RESOURCES UNIT AGREEMENTS Participating Area § 3282.2 When must the unit operator have a participating area approved? You must have an established BLM-approved participating area to allocate production and...

  18. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for..., banner towing, skywriting or similar agricultural or industrial operations within the United...

  19. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for..., banner towing, skywriting or similar agricultural or industrial operations within the United...

  20. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for..., banner towing, skywriting or similar agricultural or industrial operations within the United...

  1. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for..., banner towing, skywriting or similar agricultural or industrial operations within the United...

  2. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for..., banner towing, skywriting or similar agricultural or industrial operations within the United...

  3. 78 FR 53482 - Entergy Operations, Inc., River Bend Station, Unit 1; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... environment (78 FR 50454; August 19, 2013). This exemption is effective upon issuance. Dated at Rockville... COMMISSION Entergy Operations, Inc., River Bend Station, Unit 1; Exemption 1.0 Background Entergy Operations... operation of the River Bend Station, Unit 1 (RBS). The license provides, among other things, that...

  4. Operational air quality forecast guidance for the United States

    NASA Astrophysics Data System (ADS)

    Stajner, Ivanka; Lee, Pius; Tong, Daniel; Pan, Li; McQueen, Jeff; Huang, Jinaping; Djalalova, Irina; Wilczak, James; Huang, Ho-Chun; Wang, Jun; Stein, Ariel; Upadhayay, Sikchya

    2016-04-01

    NOAA provides operational air quality predictions for ozone and wildfire smoke over the United States (U.S.) and predictions of airborne dust over the contiguous 48 states at http://airquality.weather.gov. These predictions are produced using U.S. Environmental Protection Agency (EPA) Community Model for Air Quality (CMAQ) and NOAA's HYSPLIT model (Stein et al., 2015) with meteorological inputs from the North American Mesoscale Forecast System (NAM). The current efforts focus on improving test predictions of fine particulate matter (PM2.5) from CMAQ. Emission inputs for ozone and PM2.5 predictions include inventory information from the U.S. EPA and recently added contributions of particulate matter from intermittent wildfires and windblown dust that rely on near real-time information. Current testing includes refinement of the vertical grid structure in CMAQ and inclusion of contributions of dust transport from global sources into the U.S. domain using the NEMS Global Aerosol Capability (NGAC). The addition of wildfire smoke and dust contributions in CMAQ reduced model underestimation of PM2.5 in summertime. Wintertime overestimation of PM2.5 was reduced by suppressing emissions of soil particles when the terrain is covered by snow or ice. Nevertheless, seasonal biases and biases in the diurnal cycle of PM2.5 are still substantial. Therefore, a new bias correction procedure based on an analog ensemble approach was introduced (Djalalova et al., 2015). It virtually eliminates biases in monthly means or in the diurnal cycle, but it also reduces day-to-day variability in PM2.5 predictions. Refinements to the bias correction procedure are being developed. Upgrades for the representation of wildfire smoke emissions within the domain and from global sources are in testing. Another area of active development includes approaches to scale emission inventories for nitrogen oxides in order to reproduce recent changes observed by the AirNow surface monitoring network and by

  5. Machine tests slow-speed sliding friction in high vacuum

    NASA Technical Reports Server (NTRS)

    Skyrus, J.; Wilkinson, C.

    1967-01-01

    Testing machine that operates without any lubrication of the machine elements within the vacuum chamber measures static friction and sliding friction at very low speeds. Moving parts are held to a minimum to simplify operation in the vacuum chamber.

  6. Internal rotor friction instability

    NASA Technical Reports Server (NTRS)

    Walton, J.; Artiles, A.; Lund, J.; Dill, J.; Zorzi, E.

    1990-01-01

    The analytical developments and experimental investigations performed in assessing the effect of internal friction on rotor systems dynamic performance are documented. Analytical component models for axial splines, Curvic splines, and interference fit joints commonly found in modern high speed turbomachinery were developed. Rotor systems operating above a bending critical speed were shown to exhibit unstable subsynchronous vibrations at the first natural frequency. The effect of speed, bearing stiffness, joint stiffness, external damping, torque, and coefficient of friction, was evaluated. Testing included material coefficient of friction evaluations, component joint quantity and form of damping determinations, and rotordynamic stability assessments. Under conditions similar to those in the SSME turbopumps, material interfaces experienced a coefficient of friction of approx. 0.2 for lubricated and 0.8 for unlubricated conditions. The damping observed in the component joints displayed nearly linear behavior with increasing amplitude. Thus, the measured damping, as a function of amplitude, is not represented by either linear or Coulomb friction damper models. Rotordynamic testing of an axial spline joint under 5000 in.-lb of static torque, demonstrated the presence of an extremely severe instability when the rotor was operated above its first flexible natural frequency. The presence of this instability was predicted by nonlinear rotordynamic time-transient analysis using the nonlinear component model developed under this program. Corresponding rotordynamic testing of a shaft with an interference fit joint demonstrated the presence of subsynchronous vibrations at the first natural frequency. While subsynchronous vibrations were observed, they were bounded and significantly lower in amplitude than the synchronous vibrations.

  7. Analysis of alky unit DIB exposes design, operating considerations

    SciTech Connect

    Schneider, D.F.; Musumeci, J.; Chavez, R.

    1996-09-30

    A recent examination of an alkylation plant deisobutanizer (DIB) illustrates design and operating considerations that should be addressed when capacity increases and efficiency improvements are desired. This sulfuric acid alkylation plant had excess feed and reaction zone capacity. The DIB was the limiting factor; specifically, the DIB reboiler duty was at its maximum and the reboiler steam-supply valves were wide open. A new alkylate Rvp specification of 5.0 psia also was constraining operation. An engineering review suggested minor design modifications and maintenance items which, when implemented, increased alkylate production capacity by more than 25%. The paper discusses DIB operation, reboiler review, superheated steam supply, fouling, improvements, and revised operation.

  8. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  9. Rolling-Friction Robotic Gripper

    NASA Technical Reports Server (NTRS)

    Vranish, John M.

    1992-01-01

    Robotic gripper using rolling-friction fingers closes in on object with interface designed to mate with rollers somewhat misaligned initially, aligns object with respect to itself, then holds object securely in uniquely determined position and orientation. Operation of gripper causes minimal wear and burring of gripper and object. Exerts minimal friction forces on object when grasping and releasing. Releases object easily and reliably even when side forces and torques are between itself and object.

  10. Size Scaling of Static Friction

    NASA Astrophysics Data System (ADS)

    Braun, O. M.; Manini, Nicola; Tosatti, Erio

    2013-02-01

    Sliding friction across a thin soft lubricant film typically occurs by stick slip, the lubricant fully solidifying at stick, yielding and flowing at slip. The static friction force per unit area preceding slip is known from molecular dynamics (MD) simulations to decrease with increasing contact area. That makes the large-size fate of stick slip unclear and unknown; its possible vanishing is important as it would herald smooth sliding with a dramatic drop of kinetic friction at large size. Here we formulate a scaling law of the static friction force, which for a soft lubricant is predicted to decrease as fm+Δf/Aγ for increasing contact area A, with γ>0. Our main finding is that the value of fm, controlling the survival of stick slip at large size, can be evaluated by simulations of comparably small size. MD simulations of soft lubricant sliding are presented, which verify this theory.

  11. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    SciTech Connect

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  12. 75 FR 11947 - STP Nuclear Operating Company, South Texas Project, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION STP Nuclear Operating Company, South Texas Project, Units 1 and 2; Exemption 1.0 Background STP Nuclear Operating Company (STPNOC, the licensee) is the holder of Facility Operating Licenses numbered NPF-76 and NPF-80, which authorize operation...

  13. 75 FR 61226 - Exemption; Entergy Operations, Inc.; Arkansas Nuclear One, Units 1 and 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... COMMISSION Exemption; Entergy Operations, Inc.; Arkansas Nuclear One, Units 1 and 2 1.0 Background Entergy..., which authorize operation of the Arkansas Nuclear One, Units 1 and 2 (ANO-1 and ANO-2), respectively... the ANO-1 TS conversion, the submittal date for ANO-1 became May 1. The licensee continued to send...

  14. 43 CFR 3137.51 - Under what conditions does BLM permit multiple unit operators?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Under what conditions does BLM permit multiple unit operators? 3137.51 Section 3137.51 Public Lands: Interior Regulations Relating to Public...-Alaska Optional Terms § 3137.51 Under what conditions does BLM permit multiple unit operators?...

  15. 75 FR 15746 - Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... on the quality of the human environment (75 FR 13798, dated March 23, 2010). This exemption is... COMMISSION Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3; Exemption 1.0 Background... authorizes operation of the Waterford Steam Electric Station, Unit 3 (Waterford 3). The license...

  16. Legal problems of the financing of United Nations peacekeeping operations

    SciTech Connect

    Algayed, A.A.

    1986-01-01

    This study analyzes the question of the authority of the General Assembly to apportion the expenses of UN peacekeeping operations among the Member States. It also examines the issue of the applicability of the suspension-of-vote sanction under article 19 of the Charter to States in requisite arrears on their assessed contributions for peacekeeping operations. The efforts made by General Assembly working groups and committees to resolve the dispute and develop a reliable method of financing future peacekeeping operations are also discussed. Despite various efforts by the General Assembly to resolve the above-mentioned controversy, both the question of the legal position of the General Assembly in requiring all of the Members to bear the costs of peacekeeping operations and the related issue of the legality of the invocation of the loss-of-vote sanction remained unsettled. The conclusion of this study suggests that financing UN peacekeeping operations should be based on the principle of collective financial responsibility, with particular consideration given to the capacity of each Member State to pay. Other considerations such as the special responsibility of the permanent members of the Security Council and the situation of both the aggressor and the victim in a specific confrontation are discussed.

  17. Non-Operating Room Anesthesia in the Endoscopy Unit.

    PubMed

    Bhavani, Sekar

    2016-07-01

    The term, non-operating room anesthesia, describes a location remote from the main operating suites and closer to the patient, including areas that offer specialized procedures, like endoscopy suites, cardiac catheterization laboratories, bronchoscopy suites, and invasive radiology suites. There has been an exponential growth in such procedures and they present challenges in both organizational aspects and administration of anesthesia. This article explores the requirements for the location, preoperative evaluation and patient selection, monitoring, anesthesia technique, and postoperative management at these sites. There is a need to better define the role of the anesthesia personnel at these remote sites. PMID:27372771

  18. An Innovative Method for Dynamic Characterization of Fan FilterUnit Operation.

    SciTech Connect

    Xu, Tengfang

    2006-12-21

    Fan filter units (FFU) are widely used to deliver re-circulated air while providing filtration control of particle concentration in controlled environments such as cleanrooms, minienvironments, and operating rooms in hospitals. The objective of this paper is to document an innovative method for characterizing operation and control of an individual fan filter unit within its operable conditions. Built upon the draft laboratory method previously published [1] , this paper presents an updated method including a testing procedure to characterize dynamic operation of fan filter units, i.e., steady-state operation conditions determined by varied control schemes, airflow rates, and pressure differential across the units. The parameters for dynamic characterization include total electric power demand, total pressure efficiency, airflow rate, pressure differential across fan filter units, and airflow uniformity.

  19. Surgeon specialization and operative mortality in United States: retrospective analysis

    PubMed Central

    Dalton, Maurice; Cutler, David M; Birkmeyer, John D; Chandra, Amitabh

    2016-01-01

    Objective To measure the association between a surgeon’s degree of specialization in a specific procedure and patient mortality. Design Retrospective analysis of Medicare data. Setting US patients aged 66 or older enrolled in traditional fee for service Medicare. Participants 25 152 US surgeons who performed one of eight procedures (carotid endarterectomy, coronary artery bypass grafting, valve replacement, abdominal aortic aneurysm repair, lung resection, cystectomy, pancreatic resection, or esophagectomy) on 695 987 patients in 2008-13. Main outcome measure Relative risk reduction in risk adjusted and volume adjusted 30 day operative mortality between surgeons in the bottom quarter and top quarter of surgeon specialization (defined as the number of times the surgeon performed the specific procedure divided by his/her total operative volume across all procedures). Results For all four cardiovascular procedures and two out of four cancer resections, a surgeon’s degree of specialization was a significant predictor of operative mortality independent of the number of times he or she performed that procedure: carotid endarterectomy (relative risk reduction between bottom and top quarter of surgeons 28%, 95% confidence interval 0% to 48%); coronary artery bypass grafting (15%, 4% to 25%); valve replacement (46%, 37% to 53%); abdominal aortic aneurysm repair (42%, 29% to 53%); lung resection (28%, 5% to 46%); and cystectomy (41%, 8% to 63%). In five procedures (carotid endarterectomy, valve replacement, lung resection, cystectomy, and esophagectomy), the relative risk reduction from surgeon specialization was greater than that from surgeon volume for that specific procedure. Furthermore, surgeon specialization accounted for 9% (coronary artery bypass grafting) to 100% (cystectomy) of the relative risk reduction otherwise attributable to volume in that specific procedure. Conclusion For several common procedures, surgeon specialization was an important predictor

  20. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    SciTech Connect

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  1. 78 FR 52987 - Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ...The U.S. Nuclear Regulatory Commission (NRC) has concluded that existing exemptions from its regulations, ``Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979,'' for Fire Areas ETN-4 and PAB-2, issued to Entergy Nuclear Operations, Inc. (the licensee), for operation of Indian Point Nuclear Generating Unit 3 (Indian Point 3), located in Westchester County,......

  2. 78 FR 50454 - Entergy Operations, Inc., River Bend Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Operations, Inc., River Bend Station, Unit 1 AGENCY: Nuclear Regulatory Commission. ACTION...-47, issued to Entergy Operations, Inc. (the licensee), for operation of the River Bend Station,...

  3. Standard formatted data units-control authority operations

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this document is to illustrate a Control Authority's (CA) possible operation. The document is an interpretation and expansion of the concept found in the CA Procedures Recommendation. The CA is described in terms of the functions it performs for the management and control of data descriptions (metadata). Functions pertaining to the organization of Member Agency Control Authority Offices (MACAOs) (e.g., creating and disbanding) are not discussed. The document also provides an illustrative operational view of a CA through scenarios describing interaction between those roles involved in collecting, controlling, and accessing registered metadata. The roles interacting with the CA are identified by their actions in requesting and responding to requests for metadata, and by the type of information exchanged. The scenarios and examples presented in this document are illustrative only. They represent possible interactions supported by either a manual or automated system. These scenarios identify requirements for an automated system. These requirements are expressed by identifying the information to be exchanged and the services that may be provided by a CA for that exchange.

  4. Ground operations demonstration unit for liquid hydrogen initial test results

    NASA Astrophysics Data System (ADS)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-12-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  5. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    NASA Technical Reports Server (NTRS)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  6. ISS Plasma Contactor Units Operations During Strong Geomagnetic Activity

    NASA Astrophysics Data System (ADS)

    Alred, J.; Mikatarian, R.; Barsamian, H.; Minow, J.; Koontz, S.

    2003-12-01

    The large structure and high voltage arrays of the ISS represent a complex system that interacts with the Earth's ionosphere. To mitigate spacecraft charging problems on the ISS, two Plasma Contactor Units discharge ionized xenon gas to "clamp" the potential of the ISS with respect to the low Earth orbit plasma. The Plasma Interaction Model, a model of ISS plasma interaction developed from the basic physics of the interaction phenomena, includes magnetic induction effects, plasma temperature and density effects, interaction of the high voltage solar arrays with ionospheric plasma, and accounts for other conductive areas on the ISS. To augment this model, the PCU discharge current has been monitored for the ISS in a variety of flight attitudes as well as during the annual seasons. A review of the PCU discharge currents shows a correlation to the geomagnetic activity. The variation in the PCU discharge current during strong geomagnetic activity will be presented. Also, the PCU discharge currents during periods of low geomagnetic activity will be discussed. The presentation will conclude with a comparison of satellite plasma measurements during different stages of geomagnetic activity.

  7. Versatile Friction Stir Welding/Friction Plug Welding System

    NASA Technical Reports Server (NTRS)

    Carter, Robert

    2006-01-01

    A proposed system of tooling, machinery, and control equipment would be capable of performing any of several friction stir welding (FSW) and friction plug welding (FPW) operations. These operations would include the following: Basic FSW; FSW with automated manipulation of the length of the pin tool in real time [the so-called auto-adjustable pin-tool (APT) capability]; Self-reacting FSW (SRFSW); SR-FSW with APT capability and/or real-time adjustment of the distance between the front and back shoulders; and Friction plug welding (FPW) [more specifically, friction push plug welding] or friction pull plug welding (FPPW) to close out the keyhole of, or to repair, an FSW or SR-FSW weld. Prior FSW and FPW systems have been capable of performing one or two of these operations, but none has thus far been capable of performing all of them. The proposed system would include a common tool that would have APT capability for both basic FSW and SR-FSW. Such a tool was described in Tool for Two Types of Friction Stir Welding (MFS- 31647-1), NASA Tech Briefs, Vol. 30, No. 10 (October 2006), page 70. Going beyond what was reported in the cited previous article, the common tool could be used in conjunction with a plug welding head to perform FPW or FPPW. Alternatively, the plug welding head could be integrated, along with the common tool, into a FSW head that would be capable of all of the aforementioned FSW and FPW operations. Any FSW or FPW operation could be performed under any combination of position and/or force control.

  8. Operational optimization of large-scale parallel-unit SWRO desalination plant using differential evolution algorithm.

    PubMed

    Wang, Jian; Wang, Xiaolong; Jiang, Aipeng; Jiangzhou, Shu; Li, Ping

    2014-01-01

    A large-scale parallel-unit seawater reverse osmosis desalination plant contains many reverse osmosis (RO) units. If the operating conditions change, these RO units will not work at the optimal design points which are computed before the plant is built. The operational optimization problem (OOP) of the plant is to find out a scheduling of operation to minimize the total running cost when the change happens. In this paper, the OOP is modelled as a mixed-integer nonlinear programming problem. A two-stage differential evolution algorithm is proposed to solve this OOP. Experimental results show that the proposed method is satisfactory in solution quality. PMID:24701180

  9. Operational Optimization of Large-Scale Parallel-Unit SWRO Desalination Plant Using Differential Evolution Algorithm

    PubMed Central

    Wang, Xiaolong; Jiang, Aipeng; Jiangzhou, Shu; Li, Ping

    2014-01-01

    A large-scale parallel-unit seawater reverse osmosis desalination plant contains many reverse osmosis (RO) units. If the operating conditions change, these RO units will not work at the optimal design points which are computed before the plant is built. The operational optimization problem (OOP) of the plant is to find out a scheduling of operation to minimize the total running cost when the change happens. In this paper, the OOP is modelled as a mixed-integer nonlinear programming problem. A two-stage differential evolution algorithm is proposed to solve this OOP. Experimental results show that the proposed method is satisfactory in solution quality. PMID:24701180

  10. Record of Decision for the Ford Building Waste Unit (643-11G) Operable Unit

    SciTech Connect

    Fraley, S.

    2002-06-13

    This decision document presents the selected remedial for the Ford Building Waste Unit (FBWU), in Aiken, South Carolina, which was chosen in accordance with CERCLA, as amended by SARA, and, to the extent practical, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This decision is based on the Administrative Record File for this specific RCRA/CERCLA site.

  11. Shakedown operation of group of units for aromatic hydrocarbon production at the Novopolotsk petroleum refinery

    SciTech Connect

    Rudkovskii, A.D.; Chesnovitskii, K.G.; Koroleva, M.I.; Sulimov, A.D.; Teteruk, V.G.

    1983-03-01

    This article describes how technical xylene and C/sub 9/ aromatic hydrocarbons are produced in catalytic reformers operated in conjunction with diethylene glycol extraction units. In the operation of the unit, the greatest difficulties were encountered in purification of the p-xylene, owing to frequent mechanical failures of the equipment of the pulsed columns due to hydraulic shock and unstable operation under the process conditions required to obtain a product with a purity above 99%. As a result of the successful shakedown operations of individual aromatic hydrocarbons, the yields of commercial products (ethylbenzene, p-xylene, o-xylene, pseudocumene) have amounted to 76.9% of the technical xylene feed.

  12. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    SciTech Connect

    Naiknimbalkar, N.

    1993-08-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging.

  13. 78 FR 39018 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3 AGENCY: Nuclear Regulatory Commission. ACTION: Supplement to Final Supplement 38 to the Generic...

  14. The Design, Testing and Operation of the IUE Data Processing Unit Power Supply

    NASA Technical Reports Server (NTRS)

    Gillis, J. A., Jr.

    1974-01-01

    The design and operation is reported of the power supply for the IUE data processing unit. Design specifications are presented along with performance data and parts selection. Illustrations show the completed circuit with and without its covers.

  15. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    SciTech Connect

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  16. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    SciTech Connect

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.

  17. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    SciTech Connect

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).

  18. Effect of grafted oligopeptides on friction.

    PubMed

    Iarikov, Dmitri D; Ducker, William A

    2013-05-14

    Frictional and normal forces in aqueous solution at 25 °C were measured between a glass particle and oligopeptide films grafted from a glass plate. Homopeptide molecules consisting of 11 monomers of either glutamine, leucine, glutamic acid, lysine, or phenylalanine and one heteropolymer were each "grafted from" an oxidized silicon wafer using microwave-assisted solid-phase peptide synthesis. The peptide films were characterized using X-ray photoelectron spectroscopy and secondary ion mass spectrometry. Frictional force measurements showed that the oligopeptides increased the magnitude of friction compared to that on a bare hydrophilic silicon wafer but that the friction was a strong function of the nature of the monomer unit. Overall we find that the friction is lower for more hydrophilic films. For example, the most hydrophobic monomer, leucine, exhibited the highest friction whereas the hydrophilic monomer, polyglutamic acid, exhibited the lowest friction at zero load. When the two surfaces had opposite charges, there was a strong attraction, adhesion, and high friction between the surfaces. Friction for all polymers was lower in phosphate-buffered saline than in pure water, which was attributed to lubrication via hydrated salt ions. PMID:23594080

  19. Respirable dust control on longwall mining operations in the United States. Informational report

    SciTech Connect

    Mundell, R.L.; Jankowski, R.A.; Ondrey, R.S.; Tomb, T.F.

    1984-01-01

    The paper discusses the results of respirable dust studies conducted on United States longwall mining operations in 1972 and 1978. Prevalent engineering control methods (ventilation, water application and use of machine cutting parameters) and administrative controls for minimizing employees respirable dust exposures are discussed. Current research efforts for the control of respirable dust on longwall mining operations are reviewed.

  20. Soils and groundwater cleanup at Fernald: A status update on Operable Unit No. 5

    SciTech Connect

    Yerace, P.J.; Bomberger, A.K.; Brettschneider, D.J.

    1993-11-01

    This report discusses a status update on the cleanup operations at FERNALD. Discussed is the regulatory framework for FERNALD cleanup; overview of the FERNALD site; description of operable unit 5;remedial investigation; pattern of contamination; feasibility studies; and tangible progress to date.

  1. 77 FR 62247 - Dynamic Positioning Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... Unit Dynamic Positioning Guidance'' 77 FR 26562. The notice highlighted that DP incidents on MODUs can... (ASOG) for each OCS activity and operate within the vessel's CAMO when that OCS activity is critical... recommends that any vessel engaged in DP Simultaneous Operations (SIMOPS) follow applicable WSOGs...

  2. Feasibility study report for the 200-BP-1 operable unit. Revision 1

    SciTech Connect

    Not Available

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 {times} 10{sup 5}.

  3. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    NASA Astrophysics Data System (ADS)

    Patsch, Marek; Čaja, Alexander

    2015-05-01

    Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  4. Improved Coulomb-Friction Damper

    NASA Technical Reports Server (NTRS)

    Campbell, G. E.

    1985-01-01

    Equal damping provided on forward and reverse strokes. Improved damper has springs and wedge rings symmetrically placed on both ends of piston wedge, so friction force same in both directions of travel. Unlike conventional automotive shock absorbers, they resemble on outside, both versions require no viscous liquid and operate over wide temperature range.

  5. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    SciTech Connect

    Specht, W.L.

    2000-02-11

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity.

  6. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    SciTech Connect

    Not Available

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  7. Development and Use of a Web Site with Multimedia Contents as a Complement to Traditional Unit Operations Courses

    ERIC Educational Resources Information Center

    Tapia, Cristian; Muller, Mauricio; Sapag-Hagar, Jaime; Valenzuela, Fernando; Basualto, Carlos; Abugoch, Lilian

    2005-01-01

    The Unit Operations Laboratory offers 2 courses in unit operations. One is a 2-semester course for chemistry and food engineering students that is more demanding because it considers more unit operations and places more emphasis on solving exercises. The other is a 1-semester course for chemistry and pharmacy students that considers fewer unit…

  8. Instantaneous engine frictional torque, its components and piston assembly friction

    SciTech Connect

    Nichols, F.A. ); Henein, N.A. . Center for Automotive Research)

    1992-05-01

    The overall goal of this report is to document the work done to determine the instantaneous frictional torque of internal combustion engine by using a new approach known as (P-[omega]) method developed at Wayne State University. The emphasis has been to improve the accuracy of the method, and apply it to both diesel and gasoline engines under different operating conditions. Also work included an investigation to determine the effect of using advanced materials and techniques to coat the piston rings on the instantaneous engine frictional torque and the piston assembly friction. The errors in measuring the angular velocity, [omega], have been determined and found to be caused by variations in the divisions within one encoder, encoder-to-encoder variations, misalignment within the encoder itself and misalignment between the encoder and crankshaft. The errors in measuring the cylinder gas pressure, P, have been determined and found to be caused by transducer-to-transducer variations, zero drift, thermal stresses and lack of linearity. The ability of the (P-[omega]) method in determining the frictional torque of many engine components has been demonstrated. These components include valve train, fuel injection pump with and without fuel injection, and piston with and without different ring combinations. The emphasis in this part of the research program has been on the piston-ring assembly friction. The effects of load and other operating variables on IFT have been determined. The motoring test, which is widely used in industry to measure engine friction has been found to be inaccurate. The errors have been determined at different loads.

  9. Friction Stir Welding

    NASA Technical Reports Server (NTRS)

    Nunes, Arthur C., Jr.

    2008-01-01

    Friction stir welding (FSW) is a solid state welding process invented in 1991 at The Welding Institute in the United Kingdom. A weld is made in the FSW process by translating a rotating pin along a weld seam so as to stir the sides of the seam together. FSW avoids deleterious effects inherent in melting and promises to be an important welding process for any industries where welds of optimal quality are demanded. This article provides an introduction to the FSW process. The chief concern is the physical effect of the tool on the weld metal: how weld seam bonding takes place, what kind of weld structure is generated, potential problems, possible defects for example, and implications for process parameters and tool design. Weld properties are determined by structure, and the structure of friction stir welds is determined by the weld metal flow field in the vicinity of the weld tool. Metal flow in the vicinity of the weld tool is explained through a simple kinematic flow model that decomposes the flow field into three basic component flows: a uniform translation, a rotating solid cylinder, and a ring vortex encircling the tool. The flow components, superposed to construct the flow model, can be related to particular aspects of weld process parameters and tool design; they provide a bridge to an understanding of a complex-at-first-glance weld structure. Torques and forces are also discussed. Some simple mathematical models of structural aspects, torques, and forces are included.

  10. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    NASA Technical Reports Server (NTRS)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  11. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    SciTech Connect

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit.

  12. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    SciTech Connect

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit.

  13. Short-term Operating Strategy with Consideration of Load Forecast and Generating Unit Uncertainty

    NASA Astrophysics Data System (ADS)

    Sarjiya; Eua-Arporn, Bundhit; Yokoyama, Akihiko

    One of the common problems faced by many electric utilities concernes with the uncertainty from both load forecast error and generating unit unavailability. This uncertainty might lead to uneconomic operation if it is not managed properly in the planning stage. Utilities may have many operational tools, e.g. unit commitment, economic dispatch. However, they require a proper operating strategy, taking into account uncertainties. This paper explicitly demonstrates how to include the uncertainties to obtain the best operating strategy for any power systems. The uncertainty of the load forecast is handled using decision analysis method, meanwhile the uncertainty of the generating unit is approached by inclusion of risk cost to the total cost. In addition, three spinning reserve strategies based on deterministic criteria are incorporated in the development of scenario. Meanwhile, Mixed Integer Linear Programming method is utilized to generate unit commitment decision in each created scenario. The best strategy which gives the minimum total cost is selected among the developed scenarios. The proposed method has been tested using a modified of IEEE 24-bus system. Sensitivity analysis with respect to the number of unit, expected unserved energy price, standard deviation of load forecast, and probability of load level is reported.

  14. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    SciTech Connect

    Yin, S.C.L.; McCoy, J.J.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios.

  15. Respirable dust control on longwall mining operations in the United States

    SciTech Connect

    Mundell, R.L.; Jankowski, R.A.; Ondrey, R.S.; Tomb, T.F.

    1984-01-01

    Between 1967 and 1978 use of longwall methods to mine coal in the United States continually increased. Although these methods offer several advantages, health hazards often exist because of unique and difficult problems in the control of respirable dust. This paper discusses the results of respirable dust studies conducted on United States longwall mining operations in 1972 and 1978. Prevalent engineering control methods (ventilation, water application and use of machine cutting parameters) and administrative controls for minimizing employees' respirable dust exposure are discussed. Current research efforts for the control of respirable dust on longwall mining operations are reviewed. 21 figs.

  16. Operable Unit 3-13, Group 3, Other Surface Soils (Phase I) Remedial Action Report

    SciTech Connect

    L. Davison

    2007-07-31

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 3, Other Surface Soils, Phase I sites at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The 10 sites addressed in this report were defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for these 10 sites have been accomplished and are hereafter considered No Action or No Further Action sites.

  17. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report

    SciTech Connect

    Lee Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  18. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    SciTech Connect

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  19. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    SciTech Connect

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  20. Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08

    SciTech Connect

    M. S. Roddy

    2007-05-01

    This plan describes the groundwater sampling and water level monitoring that will be conducted to evaluate contaminations in the Snake River Plain Aquifer entering and leaving the Idaho National Laboratory. The sampling and monitoring locations were selected to meet the data quality objectives detailed in this plan. Data for the Snake River Plain Aquifer obtained under this plan will be evaluated in the Operable Unit 10-08 Remedial Investigation/Feasibility Study report and will be used to support the Operable Unit 10-08 Sitewide groundwater model.

  1. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request

    SciTech Connect

    L. Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  2. Data validation summary report: 300-FF-5 operable unit; Round 6 groundwater

    SciTech Connect

    Hulstrom, L.C.

    1994-03-21

    Laboratory data for Sixth Round Groundwater samples collected during the 300-FF-5 Operable Unit Remedial Investigation have been reviewed and validated to ensure that they are of sufficient quality to support decisions regarding further actions to be taken at the 300-FF-5 Operable Unit. Table 1-1 is a summary of the validated samples. This report summarizes the results previously presented to Westinghouse Hanford in a series of Preliminary Quality Assurance Reports (PQAR) for the 300-FF-5 Sixth Round Groundwater samples. In some instances, the data qualifiers originally presented in the PQARs have been changed based upon further review of the data; these changes are highlighted in the text.

  3. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    SciTech Connect

    Not Available

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  4. Structural characterization and condition for measurement statistics preservation of a unital quantum operation

    NASA Astrophysics Data System (ADS)

    Lee, Kai-Yan; Fung, Chi-Hang Fred; Chau, H. F.

    2013-05-01

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation ϕ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with ϕ, we can completely characterize the kinds of quantum states that are fixed by ϕ. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states—a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for determining what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of Størmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on a finite-dimensional quantum state.

  5. Liquid phase methanol LaPorte process development unit: Modification, operation, and support studies

    SciTech Connect

    Not Available

    1991-02-02

    The primary focus of this Process Development Unit operating program was to prepare for a confident move to the next scale of operation with a simplified and optimized process. The main purpose of these runs was the evaluation of the alternate commercial catalyst (F21/0E75-43) that had been identified in the laboratory under a different subtask of the program. If the catalyst proved superior to the previous catalyst, then the evaluation run would be continued into a 120-day life run. Also, minor changes were made to the Process Development Unit system to improve operations and reliability. The damaged reactor demister from a previous run was replaced, and a new demister was installed in the intermediate V/L separator. The internal heat exchanger was equipped with an expansion loop to relieve thermal stresses so operation at higher catalyst loadings and gas velocities would be possible. These aggressive conditions are important for improving process economics. (VC)

  6. Frictional Characteristics of graphene

    NASA Astrophysics Data System (ADS)

    Lee, Changgu; Carpick, Robert; Hone, James

    2009-03-01

    The frictional characteristics of graphene were characterized using friction force microscopy (FFM). The frictional force for monolayer graphene is more than twice that of bulk graphite, with 2,3, and 4 layer samples showing a monotonic decrease in friction with increasing sample thickness. Measurements on suspended graphene membranes show identical results, ruling out substrate effects as the cause of the observed variation. Likewise, the adhesion force is identical for all samples. The frictional force is independent of load within experimental uncertainty, consistent with previous measurements on graphite. We consider several possible explanations for the origin of the observed thickness dependence.

  7. Nanotribology and Nanoscale Friction

    SciTech Connect

    Guo, Yi; Qu, Zhihua; Braiman, Yehuda; Zhang, Zhenyu; Barhen, Jacob

    2008-01-01

    Tribology is the science and technology of contacting solid surfaces in relative motion, including the study of lubricants, lubrication, friction, wear, and bearings. It is estimated that friction and wear cost the U.S. economy 6% of the gross national product (Persson, 2000). For example, 5% of the total energy generated in an automobile engine is lost to frictional resistance. The study of nanoscale friction has a technological impact in reducing energy loss in machines, in microelectromechanical systems (MEMS), and in the development of durable, low-friction surfaces and ultra-thin lubrication films.

  8. 40 CFR 62.15145 - What are the operating practice requirements for my municipal waste combustion unit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a)...

  9. Program Unit Funding: A Handbook for ECS Operators in the 2002/2003 School Year.

    ERIC Educational Resources Information Center

    Alberta Learning, Edmonton. Special Education Branch.

    This handbook is written specifically for Early Childhood Services (ECS) operators in Alberta, Canada, applying for Program Unit Funding for students with severe disabilities. It is also designed to enhance the understanding of how assistance is provided to ECS children with severe disabilities by teachers, special needs assistants, parents, and…

  10. 77 FR 27804 - Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1 AGENCY: Nuclear Regulatory Commission. ACTION: Draft environmental assessment and finding of no significant impact, opportunity to comment. DATES: Comments must be filed by June 11,...

  11. 75 FR 13798 - Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3 Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... Federal Register notice dated March 27, 2009 (74 FR 13926). There will be no change to radioactive... no significant impact [part 73, Power Reactor Security Requirements, 74 FR 13926 (March 27, 2009... COMMISSION Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3 Environmental Assessment...

  12. 75 FR 15751 - Entergy Operations, Inc., Arkansas Nuclear One, Units 1 And 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... March 27, 2009 (74 FR 13926), establish and update generically applicable security requirements similar... on the quality of the human environment (75 FR 13607; dated March 22, 2010). This exemption is... COMMISSION Entergy Operations, Inc., Arkansas Nuclear One, Units 1 And 2; Exemption 1.0 Background...

  13. Liquid phase methanol LaPorte process development unit: Modification, operation, and support studies

    SciTech Connect

    Not Available

    1991-02-02

    This report consists of Detailed Data Acquisition Sheets for Runs E-6 and E-7 for Task 2.2 of the Modification, Operation, and Support Studies of the Liquid Phase Methanol Laporte Process Development Unit. (Task 2.2: Alternate Catalyst Run E-6 and Catalyst Activity Maintenance Run E-7).

  14. 75 FR 9955 - Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1; Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption, pursuant to Title 10 of the Code...

  15. 76 FR 77528 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California,......

  16. 76 FR 79678 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California,......

  17. 77 FR 40091 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating, Units 2 and 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating, Units 2 and 3 AGENCY: Nuclear... statement for license renewal of nuclear plants; availability. SUMMARY: The U.S. Nuclear...

  18. Limited field investigation report for the 100-KR-4 Operable Unit

    SciTech Connect

    Not Available

    1994-07-01

    This limited field investigation (LFI) was conducted to optimize the use of interim remedial measures (IRM) for expediting clean up while maintaining a technically sound and cost-effective program. The 100-KR-4 Operable Unit is one of four operable units associated with the 100 K Area. Operable units KR-1, KR-2 and KR-3 address contaminant sources while 100-KR-4 addresses contamination present in the underlying groundwater. The IRM decision process for groundwater operable units is based on three aspects: (1) Is the concentration greater than Hanford background? (2) Does the concentration present a medium or high human-health risk? (3) Does the concentration exceed an ecologically based applicable, relevant and appropriate requirements (ARAR) or present an environmental hazard quotient > I? The primary methods of investigation used during this LFI were the installation of monitoring wells and sampling of groundwater. The samples collected from the groundwater and soils were submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the location and degree of contamination. All soil samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and a minimum of 10% of subsequent round data were validated.

  19. 76 FR 5408 - Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3, Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3, Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an exemption, pursuant...

  20. 77 FR 67837 - Callaway Plant, Unit 1; Application for Amendment to Facility Operating License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Callaway Plant, Unit 1; Application for Amendment to Facility Operating License AGENCY: Nuclear Regulatory Commission. ACTION: License amendment application; withdrawal. ADDRESSES: Please refer to Docket ID NRC-2012-0275 when contacting the...

  1. Orchard Business Management. Unit II. Management and Analysis of the Orchard Operation.

    ERIC Educational Resources Information Center

    Mullinix, Shauna K.

    This guide is intended for use in providing in-depth formal classroom and on-site instruction in the principles of business and financial management as they apply to operating and managing orchards. Designed to be used with an accompanying Orchard Business Management Record Book, this unit is devoted to management and analysis of an orchard…

  2. Hydrologic resources management program and underground test area operable unit fy 1997

    SciTech Connect

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  3. Limited field investigation report for the 100-DR-1 Operable Unit

    SciTech Connect

    Not Available

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km{sup 2} (0.59 mi{sup 2}) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation.

  4. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    SciTech Connect

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  5. Limited field investigation report for the 100-BC-5 Operable Unit

    SciTech Connect

    Not Available

    1994-07-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-BC-5 Groundwater Operable Unit. The 100-BC-5 Operable Unit is one of three operable units associated with the 100 B/C Area. Operable units 1 and 2 address contaminant sources while 100-BC-5 addresses contamination present in the underlying groundwater. The primary method of investigation used during this LFI was the installation of monitoring wells. Samples were collected from the groundwater and soils and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and 10% of the subsequent rounds of data associated with the LFI were validated. The screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration constituents that were below background. Constituents considered nontoxic to humans were eliminated from the human health evaluation. Inconsistency and blank contamination were also evaluated in the screening process. These COPC were evaluated further in the qualitative risk assessment (QRA). Tritium and strontium-90 were identified as contaminants of concern at 100-BC-5 because the concentrations exceeded potential applicable or relevant and appropriate requirements. The QRA determined that the risk is low for all of the site contaminants.

  6. 75 FR 3943 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... FR 13967). There will be no change to radioactive effluents that affect radiation exposures to plant... [Part 73, Power Reactor Security Requirements, 74 FR 13926, 13967 (March 27, 2009)]. The licensee... COMMISSION Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and...

  7. Use of the LITEE Lorn Manufacturing Case Study in a Senior Chemical Engineering Unit Operations Laboratory

    ERIC Educational Resources Information Center

    Abraham, Nithin Susan; Abulencia, James Patrick

    2011-01-01

    This study focuses on the effectiveness of incorporating the Laboratory for Innovative Technology and Engineering Education (LITEE) Lorn Manufacturing case into a senior level chemical engineering unit operations course at Manhattan College. The purpose of using the case study is to demonstrate the relevance of ethics to chemical engineering…

  8. A Moveable Feast--A Progressive Approach to the Unit Operations Laboratory

    ERIC Educational Resources Information Center

    Conner, Wm. Curtis, Jr.; Hammond, Karl D.; Laurence, Robert L.

    2011-01-01

    The authors describe an alternative format for the senior laboratory in which students are allowed--indeed, expected--to communicate with previous groups and build on their results. The effect is a unit operations laboratory in which students are empowered to propose the experiments they wish to do and in which the cumulative experience of the…

  9. Ambiguity in Units and the Referents: Two Cases in Rational Number Operations

    ERIC Educational Resources Information Center

    Rathouz, Margaret

    2010-01-01

    I explore the impact of ambiguous referral to the unit on understanding of decimal and fraction operations during episodes in two different mathematics courses for pre-service teachers (PSTs). In one classroom, the instructor introduces a rectangular area diagram to help the PSTs visualize decimal multiplication. A transcript from this classroom…

  10. 27 CFR 28.58 - Operations or unit bond-distilled spirits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-distilled spirits. 28.58 Section 28.58 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND... § 28.58 Operations or unit bond—distilled spirits. (a) Spirits. Where spirits are withdrawn without payment of tax, as authorized in § 28.91, from the bonded premises of a distilled spirits plant...

  11. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    SciTech Connect

    Vukelich, S.E.

    1994-09-22

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

  12. Key operational characteristics in emergency department observation units: a comparative study between sites in the United States and Asia

    PubMed Central

    2014-01-01

    Background To improve efficiency, emergency departments (EDs) use dedicated observation units (OUs) to manage patients who are unable to be discharged home, yet do not clearly require inpatient hospitalization. However, operational metrics and their ideal targets have not been created for this setting and patient population. Variation in these metrics across different countries has not previously been reported. This study aims to define and compare key operational characteristics between three ED OUs in the United States (US) and three ED OUs in Asia. Methods This is a descriptive study of six tertiary-care hospitals, all of which are level 1 trauma centers and have OUs managed by ED staff. We collected data via various methods, including a standardized survey, direct observation, and interviews with unit leadership, and compared these data across continents. Results We define multiple key operational characteristics to compare between sites, including OU length of stay (LOS), OU discharge rate, and bed turnover rate. OU LOS in the US and Asian sites averaged 12.9 hours (95% CI, 8.3 to 17.5) and 20.5 hours (95% CI, -49.4 to 90.4), respectively (P = 0.39). OU discharge rates in the US and Asia averaged 84.3% (95% CI, 81.5 to 87.2) and 88.7% (95% CI, 81.5 to 95.8), respectively (P = 0.11), and the bed turnover rates in the US and Asian sites averaged 1.6 patients/bed/day (95% CI, -0.1 to 3.3) and 0.9 patient/bed/day (95% CI, -0.6 to 2.4), respectively (P = 0.27). Conclusions Prior research has shown that the OU is a resource that can mitigate many of problems in the ED and hospital, while simultaneously improving patient care and satisfaction. We describe key operational characteristics that are relevant to all OUs, regardless of geography or healthcare system to monitor and maximize efficiency. Although measures of LOS and bed turnover varied widely between US and Asian sites, we did not find a statistically significant difference. Use of these metrics

  13. Limited field investigation report for the 100-HR-3 operable unit

    SciTech Connect

    Not Available

    1994-09-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-HR-3 Groundwater Operable Unit. The 100-HR-3 Operable Unit is comprised of three subareas; the 100 D Area, the 100 H Area and those portions of the 600 Area between the two reactor areas. The operable unit is one of seven operable units associated with the 100 D and H Areas. Operable units 100-DR-1, 100-DR-2, 100-DR-3, 100-HR-1, 100-HR-2 and 100-IU-4 address contaminant sources while 100-HR-3 addresses contamination present in the underlying groundwater. The primary method of field investigation used during this LFI was the installation and sampling of monitoring wells. Samples were collected from the groundwater and soils, and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all round one, two and three and a minimum of 10% of round four data associated with the LFI were validated. A screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration, constituents that were below background. Constituents which are considered non-toxic to humans were eliminated from the human health evaluation. Data consistency and blank contamination were also evaluated in the screening process. These COPC were then evaluated further in the qualitative risk assessment (QRA). A human health QRA was performed using conservative (maximum equilibrated contaminant levels from the LFI) analyses.

  14. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    SciTech Connect

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume.

  15. [Operational Management of Multidisciplinary Organ-Based Tumor Units in Our Cancer Center].

    PubMed

    Kato, Hiroaki; Tsujie, Masanori; Ichimura, Noriko; Yukawa, Masao; Inoue, Masatoshi

    2016-05-01

    Owing to the advances in diagnosis and treatment, it is imperative to develop a multidisciplinary approach for the management of cancer patients. In our cancer center, multidisciplinary organ-based tumor units have been organized for team medical care. These units consist of cancer specialists from multiple departments including medical oncology, surgery, radiology, histopathology, and nursing. Members of each unit regularly conduct meetings to discuss diagnostic and therapeutic aspects, as well as to report the progress of cancer patients. Co-operation with the counseling and support center, utilization of the computerized medical record system, and using brochures for advertisement, all play important roles in adequate management of multidisciplinary organ-based tumor units. PMID:27210090

  16. Soil washing physical separations test procedure - 300-FF-1 operable unit

    SciTech Connect

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  17. 47 CFR 90.421 - Operation of mobile station units not under the control of the licensee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of mobile station units not under the... (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Operating Requirements § 90.421 Operation of mobile station units not under the control of the licensee. Mobile stations,...

  18. Micromachine friction test apparatus

    DOEpatents

    deBoer, Maarten P.; Redmond, James M.; Michalske, Terry A.

    2002-01-01

    A microelectromechanical (MEM) friction test apparatus is disclosed for determining static or dynamic friction in MEM devices. The friction test apparatus, formed by surface micromachining, is based on a friction pad supported at one end of a cantilevered beam, with the friction pad overlying a contact pad formed on the substrate. A first electrostatic actuator can be used to bring a lower surface of the friction pad into contact with an upper surface of the contact pad with a controlled and adjustable force of contact. A second electrostatic actuator can then be used to bend the cantilevered beam, thereby shortening its length and generating a relative motion between the two contacting surfaces. The displacement of the cantilevered beam can be measured optically and used to determine the static or dynamic friction, including frictional losses and the coefficient of friction between the surfaces. The test apparatus can also be used to assess the reliability of rubbing surfaces in MEM devices by producing and measuring wear of those surfaces. Finally, the friction test apparatus, which is small in size, can be used as an in situ process quality tool for improving the fabrication of MEM devices.

  19. Bearing-cage frictional instability - A mechanical model

    SciTech Connect

    Rivera, M.P. )

    1991-01-01

    Bearing-cage frictional instability is analyzed by means of a simple mechanistic model. This model considers the frictional dynamic aspects of the bearing cage. The investigation of the motion-stability of this model is based on the concept of Liapunov functions. It is shown that the bearing-cage operation is frictionally stable whenever the friction force (combined solid and fluid) slope is negative and whenever a condition on the slope satisfies an inequality to be established. A simulated test shows the existence of a speed threshold on the onset of frictional stability. 8 refs.

  20. Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations

    SciTech Connect

    G. B. Mitchem

    2001-08-22

    This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

  1. NASA tire/runway friction projects

    NASA Technical Reports Server (NTRS)

    Yager, Thomas J.

    1995-01-01

    The paper reviews several aspects of NASA Langley Research Center's tire/runway friction evaluations directed towards improving the safety and economy of aircraft ground operations. The facilities and test equipment used in implementing different aircraft tire friction studies and other related aircraft ground performance investigations are described together with recent workshop activities at NASA Wallops Flight Facility. An overview of the pending Joint NASA/Transport Canada/FM Winter Runway Friction Program is given. Other NASA ongoing studies and on-site field tests are discussed including tire wear performance and new surface treatments. The paper concludes with a description of future research plans.

  2. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  3. Identifying operating units for the design and synthesis of azeotropic-distillation systems

    SciTech Connect

    Feng, G.; Fan, L.T.; Friedler, F.; Seib, P.A.

    2000-01-01

    A highly effective method has been established to identify processing or operating units necessary for the design or synthesis of azeotropic-distillation systems by resorting to the first principles and logical sequencing of such units. The materials represented in the space of the residue curve map are partitioned into lumped materials bounded by the thermodynamic boundaries and pinches. Subsequently, the operating units are identified on the basis of these lumped materials. The efficacy of the method has been amply illustrated by generating some feasible flowsheets with a set of relatively simple heuristics for the process of producing pure ethanol from its aqueous solution via azeotropic distillation, which is a typical complex process involving thermodynamic pinches, such as azeotropes, phase transition, and/or phase separation. The method is applicable to other complex processes, e.g., crystallization, extraction, reactive distillation, and their combinations. It is highly likely that the method can be an integral part of any conventional heuristic or algorithmic flowsheeting procedure because selecting plausible or candidate operating units is essential for synthesizing a flowsheet by any procedure.

  4. The prevalence of long QT interval in post-operative intensive care unit patients.

    PubMed

    Pham, Julius Cuong; Banks, Michael C; Narotsky, David L; Dorman, Todd; Winters, Bradford D

    2016-08-01

    The severity of patient illnesses and medication complexity in post-operative critically ill patients increase the risk for a prolonged QT interval. We determined the prevalence of prolonged QTc in surgical intensive care unit (SICU) patients. We performed a prospective cross-sectional study over a 15-month period at a major academic center. SICU pre-admission and admission EKGs, patient demographics, and laboratory values were analyzed. QTc was evaluated as both a continuous and dichotomous outcome (prolonged QTc > 440 ms). 281 patients were included in the study: 92 % (n = 257) post-operative and 8 % (n = 24) non-operative. On pre-admission EKGs, 32 % of the post-operative group and 42 % of the non-operative group had prolonged QTc (p = 0.25); on post-admission EKGs, 67 % of the post-operative group but only 33 % of the non-operative group had prolonged QTc (p < 0.01). The average change in QTc in the post-operative group was +30.7 ms, as compared to +2 ms in the non-operative group (p < 0.01). On multivariable adjustment for long QTc as a dichotomous outcome, pre-admission prolonged QTc (OR 3.93, CI 1.93-8.00) and having had an operative procedure (OR 4.04, CI 1.67-9.83) were associated with developing prolonged QTc. For QTc as a continuous outcome, intra-operative beta-blocker use was associated with a statistically-significant decrease in QTc duration. None of the patients developed a lethal arrhythmia in the ICU. Prolonged QTc is common among post-operative SICU patients (67 %), however lethal arrhythmias are uncommon. The operative experience increases the risk for long QTc. PMID:26169292

  5. Friction of rocks

    USGS Publications Warehouse

    Byerlee, J.

    1978-01-01

    Experimental results in the published literature show that at low normal stress the shear stress required to slide one rock over another varies widely between experiments. This is because at low stress rock friction is strongly dependent on surface roughness. At high normal stress that effect is diminished and the friction is nearly independent of rock type. If the sliding surfaces are separated by gouge composed of Montmorillonite or vermiculite the friction can be very low. ?? 1978 Birkha??user Verlag.

  6. An Automatic Uav Mapping System for Supporting un (united Nations) Field Operations

    NASA Astrophysics Data System (ADS)

    Choi, K.; Cheon, J. W.; Kim, H. Y.; Lee, I.

    2016-06-01

    The United Nations (UN) has performed field operations worldwide such as peacekeeping or rescue missions. When such an operation is needed, the UN dispatches an operation team usually with a GIS (Geographic Information System) customized to a specific operation. The base maps for the GIS are generated mostly with satellite images which may not retain a high resolution and the current situation. To build an up-to-date high resolution map, we propose a UAV (unmanned aerial vehicle) based automatic mapping system, which can operate in a fully automatic way from the data acquisition of sensory data to the data processing for the generation of the geospatial products such as a mosaicked orthoimage of a target area. In this study, we analyse the requirements for UN field operations, suggest a UAV mapping system with an operation scenario, and investigate the applicability of the system. With the proposed system, we can construct a tailored GIS with up-to-date and high resolution base maps for a specific operation efficiently.

  7. An analysis of post-traumatic stress symptoms in United States Air Force drone operators.

    PubMed

    Chappelle, Wayne; Goodman, Tanya; Reardon, Laura; Thompson, William

    2014-06-01

    Remotely piloted aircraft (RPA), commonly referred to as "drones," have emerged over the past decade as an innovative warfighting tool. Given there is a paucity of empirical research assessing drone operators, the purpose of this study was to assess for the prevalence of PTSD symptoms among this cohort. Of the 1084 United States Air Force (USAF) drone operators that participated, a total of 4.3% endorsed a pattern of symptoms of moderate to extreme level of severity meeting criteria outlined in the Diagnostic and Statistical Manual of Mental Disorders-4th edition. The incidence of PTSD among USAF drone operators in this study was lower than rates of PTSD (10-18%) among military personnel returning from deployment but higher than incidence rates (less than 1%) of USAF drone operators reported in electronic medical records. Although low PTSD rates may be promising, limitations to this study are discussed. PMID:24907535

  8. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  9. Screening of Potential Remediation Methods for the 200-BP-5 Operable Unit at the Hanford Site

    SciTech Connect

    Truex, Michael J.; Dresel, P. EVAN; Nimmons, Michael J.; Johnson, Christian D.

    2006-09-21

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-BP-5 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final (EPA 1988). The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers) identified in the groundwater sampling and analysis plan for the operable unit (DOE/RL-2001-49, Rev. 1) with additions.

  10. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    SciTech Connect

    Richard P. Wells

    2007-03-23

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year.

  11. Coal unit trains: operations, maintenance, and technology. Volume 3. Maintenance of unit-train coal cars. Final report

    SciTech Connect

    Mattison, P.D.

    1984-11-01

    This report is intended to help users of coal unit trains to understand what factors influence coal car maintenance costs, what are the expected ranges of those costs, and what options are available to car owners to control maintenance costs. To accomplish these objectives, car maintenance records were examined in light of car designs, car use, and certain characteristics of the railroads and utilities handling the cars, such as climate, terrain, and coal source. The cost of repairs and maintenance per car mile for the important mechanical subassemblies are identified and compared according to the organizations performing those repairs; the railroads, private repair shops, or utility-owned shops. To lend some further light on the advantages and disadvantages of utility-owned maintenance facilities, the cost of establishing and operating a hypothetical facility is analyzed. Important conclusions are that, in general, contract shops currently offer the greatest economy. Owner-operated shops show some advantages when the cost of capital is low and when particularly large fleets are to be maintained. Pooling of facilities to serve several separate but similar fleets may be one method for utilities to take advantage of economies of scale. 5 figures, 18 tables.

  12. Discrete Sampling Test Plan for the 200-BP-5 Operable Unit

    SciTech Connect

    Sweeney, Mark D.

    2010-02-04

    The Discrete Groundwater Sampling Project is conducted by the Pacific Northwest National Laboratory (PNNL) on behalf of CH2M HILL Plateau Remediation Company. The project is focused on delivering groundwater samples from proscribed horizons within select groundwater wells residing in the 200-BP-5 Operable Unit (200-BP-5 OU) on the Hanford Site. This document provides the scope, schedule, methodology, and other details of the PNNL discrete sampling effort.

  13. Data validation report for the 100-HR-3 Operable Unit, fifth round groundwater samples

    SciTech Connect

    Vukelich, S.E.

    1994-01-20

    The data from the chemical analysis of 68 samples from the 100-HR-3 Operable Unit Third Quarter 1993 Groundwater Sampling Investigation and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at the site. Sample analysis included inorganics and general chemical parameters. Fifty three samples were validated for radiochemical parameters.

  14. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    SciTech Connect

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of [sup 60]Co, [sup 90]Sr, and [sup 137]Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area.

  15. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    SciTech Connect

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations` suitability as indicators of chemical releases during cleanup activities at the US Department of Energy`s Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of {sup 60}Co, {sup 90}Sr, and {sup 137}Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area.

  16. INEL Operable Unit 7-13 containment and stabilization configuration option

    SciTech Connect

    Raivo, B.D.; Richardson, J.G.; Nickelson, D.F.

    1993-05-01

    A containment and stabilization configuration option has been developed for the Idaho National Engineering Laboratory`s Subsurface Disposal Area Operable Unit 7-13, the transuranic (TRU)-contaminated waste pits and trenches. The configuration option is presented as an end-to-end system block diagram. Functional subelements are separately discussed, and technical background information, assumptions, input, high-level subelement requirements, and output are presented for each option.

  17. Operation and results of the prototype KM3NeT detection unit

    NASA Astrophysics Data System (ADS)

    Biagi, Simone

    2016-07-01

    KM3NeT will be a km3-scale neutrino telescope in the Mediterranean Sea. The detector will consist of blocks of about one hundred detection units. Each detection unit will host 18 digital optical modules, connected along a 700 m-long vertical structure. Electro-optical cables allow for data transmission and power supply to the optical modules. The optical module comprises 31 photomultiplier tubes of 3'', instruments to monitor environmental variables and electronic boards to communicate onshore and operate the photomultipliers. A prototype detection unit has been deployed in May 2014 at the KM3NeT-It installation site 80 km SE offshore of Capo Passero, Sicily. This prototype allowed to test the deployment procedures, the mechanics and the electronic of the apparatus, the data taking and analysis procedures. A general description of the detector and some results of the prototype are presented. The first detection unit of the KM3NeT neutrino telescope will be deployed and become operative by the end of 2015.

  18. Effect of friction on the rheology of dense suspensions

    NASA Astrophysics Data System (ADS)

    Gallier, Stany; Lemaire, Elisabeth; Peters, François; Lobry, Laurent

    2014-11-01

    This work reports three-dimensional numerical simulations of sheared non-Brownian concentrated suspensions using a fictitious domain method. Contacts between particles are modeled using a DEM-like approach (Discrete Element Method), which allows for a more physical description, including roughness and friction. This study emphasizes the effect of friction between particles and its role on rheological properties, especially on normal stress differences. Friction is shown to notably increase viscosity and second normal stress difference | N2 | and decrease | N1 | , in better agreement with experiments. The hydrodynamic and contact contributions to the overall particle stress are particularly investigated and this shows that the effect of friction is mostly due to the additional contact stress since the hydrodynamic stress remains unaffected by friction. Simulation results are also compared with experiments and the agreement is improved when friction is accounted for: this suggests that friction is operative in actual suspensions.

  19. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  20. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    NASA Astrophysics Data System (ADS)

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  1. Preface: Friction at the nanoscale

    NASA Astrophysics Data System (ADS)

    Fusc, Claudio; Smith, Roger; Urbakh, Michael; Vanossi, Andrea

    2008-09-01

    Interfacial friction is one of the oldest problems in physics and chemistry, and certainly one of the most important from a practical point of view. Everyday operations on a broad range of scales, from nanometer and up, depend upon the smooth and satisfactory functioning of countless tribological systems. Friction imposes serious constraints and limitations on the performance and lifetime of micro-machines and, undoubtedly, will impose even more severe constraints on the emerging technology of nano-machines. Standard lubrication techniques used for large objects are expected to be less effective in the nano-world. Novel methods for control and manipulation are therefore needed. What has been missing is a molecular level understanding of processes occurring between and close to interacting surfaces to help understand, and later manipulate friction. Friction is intimately related to both adhesion and wear, and all three require an understanding of highly non-equilibrium processes occurring at the molecular level to determine what happens at the macroscopic level. Due to its practical importance and the relevance to basic scientific questions there has been major increase in activity in the study of interfacial friction on the microscopic level during the last decade. Intriguing structural and dynamical features have been observed experimentally. These observations have motivated theoretical efforts, both numerical and analytical. This special issue focusses primarily on discussion of microscopic mechanisms of friction and adhesion at the nanoscale level. The contributions cover many important aspects of frictional behaviour, including the origin of stick-slip motion, the dependence of measured forces on the material properties, effects of thermal fluctuations, surface roughness and instabilities in boundary lubricants on both static and kinetic friction. An important problem that has been raised in this issue, and which has still to be resolved, concerns the

  2. Friction and nonlinear dynamics

    NASA Astrophysics Data System (ADS)

    Manini, N.; Braun, O. M.; Tosatti, E.; Guerra, R.; Vanossi, A.

    2016-07-01

    The nonlinear dynamics associated with sliding friction forms a broad interdisciplinary research field that involves complex dynamical processes and patterns covering a broad range of time and length scales. Progress in experimental techniques and computational resources has stimulated the development of more refined and accurate mathematical and numerical models, capable of capturing many of the essentially nonlinear phenomena involved in friction.

  3. Friction and nonlinear dynamics.

    PubMed

    Manini, N; Braun, O M; Tosatti, E; Guerra, R; Vanossi, A

    2016-07-27

    The nonlinear dynamics associated with sliding friction forms a broad interdisciplinary research field that involves complex dynamical processes and patterns covering a broad range of time and length scales. Progress in experimental techniques and computational resources has stimulated the development of more refined and accurate mathematical and numerical models, capable of capturing many of the essentially nonlinear phenomena involved in friction. PMID:27249652

  4. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    SciTech Connect

    Not Available

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.

  5. Operation Evaluation of the VEGGIE Food Production System in the Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Stutte, Gary W.; Newsham, Gerard; Morrow, Robert M.; Wheeler, Raymond M.

    2011-01-01

    The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSantm as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

  6. Operational Evaluation of VEGGIE Food Production System in the Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Stutte, Gary W.; Newsham, Gerard; Morrow, Robert M.; Wheeler, Raymond M.

    2011-01-01

    The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSan(tm) as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

  7. Friction in orthodontics

    PubMed Central

    Prashant, P. S.; Nandan, Hemant; Gopalakrishnan, Meera

    2015-01-01

    Conventional wisdom suggests that resistance to sliding (RS) generated at the wire-bracket interface has a bearing on the force transmitted to the teeth. The relative importance of static and kinetic friction and also the effect of friction on anchorage has been a topic of debate. Lot of research work has been done to evaluate the various factors that affect friction and thus purportedly retards the rate of tooth movement. However, relevancy of these studies is questionable as the methodology used hardly simulates the oral conditions. Lately studies have concluded that more emphasis should be laid on binding and notching of archwires as these are considered to be the primary factors involved in retarding the tooth movement. This article reviews the various components involved in RS and the factors affecting friction. Further, research work should be carried out to provide cost effective alternatives aimed at reducing friction. PMID:26538873

  8. Statistics of frictional families.

    PubMed

    Shen, Tianqi; Papanikolaou, Stefanos; O'Hern, Corey S; Shattuck, Mark D

    2014-09-19

    We develop a theoretical description for mechanically stable frictional packings in terms of the difference between the total number of contacts required for isostatic packings of frictionless disks and the number of contacts in frictional packings, m=Nc0 - Nc. The saddle order m represents the number of unconstrained degrees of freedom that a static packing would possess if friction were removed. Using a novel numerical method that allows us to enumerate disk packings for each m, we show that the probability to obtain a packing with saddle order m at a given static friction coefficient μ, Pm(μ), can be expressed as a power series in μ. Using this form for Pm(μ), we quantitatively describe the dependence of the average contact number on the friction coefficient for static disk packings obtained from direct simulations of the Cundall-Strack model for all μ and N. PMID:25279647

  9. 40 CFR Table 3 to Subpart Llll of... - Operating Parameters for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Operating Parameters for New Sewage... Standards of Performance for New Sewage Sludge Incineration Units Pt. 60, Subpt. LLLL, Table 3 Table 3 to Subpart LLLL of Part 60—Operating Parameters for New Sewage Sludge Incineration Units a For...

  10. 40 CFR Table 3 to Subpart Llll of... - Operating Parameters for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Operating Parameters for New Sewage... Standards of Performance for New Sewage Sludge Incineration Units Pt. 60, Subpt. LLLL, Table 3 Table 3 to Subpart LLLL of Part 60—Operating Parameters for New Sewage Sludge Incineration Units a For...