Science.gov

Sample records for guarantee south brawley

  1. Hydrodynamic/kinetic reactions in liquid dominated geothermal systems: Hydroscale Test Program, Mercer 2 well site South Brawley, California (Tests No. 15--20). Final report, 27 October 1980--6 February 1981

    SciTech Connect

    Nesewich, J.P.; Gracey, C.M.

    1982-04-01

    The Aerojet Energy Conversion Company, under contract to the Los Alamos National Laboratory, US Department of Energy, has constructed and tested a mobile geothermal well-site test unit at the Mercer 2 well in South Brawley, California (Imperial Valley). The equipment controlled, monitored, and recorded all process conditions of single- and dual-flash power cycles. Single- and two-phase flashed brine effluents were flowed through piping component test sections to provide hydrodynamic/kinetic data for scale formation. The unit operated at flowrates in excess of 200 gpm and is designed to accommodate flowrates up to 300 gpm. Primary scale formations encountered were those of Pbs, Fe{sub 2} (OH){sub 3}Cl (iron hydroxychloride), iron chlorides, and non-crystalline forms Of SiO{sub 2}. The formation of iron hydroxychloride was due to the unusually high concentration of iron in the wellhead brine (5000 mg/1).

  2. Pleistocene Brawley and Ocotillo Formations: Evidence for initial strike-slip deformation along the San Felipe and San Jacinto fault zonez, Southern California

    USGS Publications Warehouse

    Kirby, S.M.; Janecke, S.U.; Dorsey, R.J.; Housen, B.A.; Langenheim, V.E.; McDougall, K.A.; Steeley, A.N.

    2007-01-01

    We examine the Pleistocene tectonic reorganization of the Pacific-North American plate boundary in the Salton Trough of southern California with an integrated approach that includes basin analysis, magnetostratigraphy, and geologic mapping of upper Pliocene to Pleistocene sedimentary rocks in the San Felipe Hills. These deposits preserve the earliest sedimentary record of movement on the San Felipe and San Jacinto fault zones that replaced and deactivated the late Cenozoic West Salton detachment fault. Sandstone and mudstone of the Brawley Formation accumulated between ???1.1 and ???0.6-0.5 Ma in a delta on the margin of an arid Pleistocene lake, which received sediment from alluvial fans of the Ocotillo Formation to the west-southwest. Our analysis indicates that the Ocotillo and Brawley formations prograded abruptly to the east-northeast across a former mud-dominated perennial lake (Borrego Formation) at ???1.1 Ma in response to initiation of the dextral-oblique San Felipe fault zone. The ???25-km-long San Felipe anticline initiated at about the same time and produced an intrabasinal basement-cored high within the San Felipe-Borrego basin that is recorded by progressive unconformities on its north and south limbs. A disconformity at the base of the Brawley Formation in the eastern San Felipe Hills probably records initiation and early blind slip at the southeast tip of the Clark strand of the San Jacinto fault zone. Our data are consistent with abrupt and nearly synchronous inception of the San Jacinto and San Felipe fault zones southwest of the southern San Andreas fault in the early Pleistocene during a pronounced southwestward broadening of the San Andreas fault zone. The current contractional geometry of the San Jacinto fault zone developed after ???0.5-0.6 Ma during a second, less significant change in structural style. ?? 2007 by The University of Chicago. All rights reserved.

  3. The 2012 Brawley swarm triggered by injection-induced aseismic slip

    NASA Astrophysics Data System (ADS)

    Wei, Shengji; Avouac, Jean-Philippe; Hudnut, Kenneth W.; Donnellan, Andrea; Parker, Jay W.; Graves, Robert W.; Helmberger, Don; Fielding, Eric; Liu, Zhen; Cappa, Frederic; Eneva, Mariana

    2015-07-01

    It has long been known that fluid injection or withdrawal can induce earthquakes, but the underlying mechanisms remain elusive. For example, the 2012 Brawley swarm, which produced two strike-slip shocks with magnitudes larger than 5.3 and surface ruptures in the close vicinity of a geothermal field, started with earthquakes about 5 km deeper than the injection depth (∼1.5 km). This makes the causality between the injection and seismicity unclear. Here, we jointly analyze broadband and strong motion waveforms, UAVSAR, leveling measurements and field observations to reveal the detailed seismic and aseismic faulting behaviors associated with the 2012 Brawley swarm. In particular, path calibration established from smaller events in the swarm allows waveform inversion to be conducted up to 3 Hz to resolve finite rupture process of the Mw 4.7 normal event. Our results show that the 2012 earthquake sequence was preceded by aseismic slip on a shallow normal fault beneath the geothermal field. Aseismic slip initiated in 2010 when injection rate rapidly increased and triggered the following earthquakes subsequently, including unusually shallow and relatively high frequency seismic excitations on the normal fault. In this example, seismicity is induced indirectly by fluid injection, a result of mediation by aseismic creep, rather than directly by a pore pressure increase at the location of the earthquakes.

  4. Shallow hydrothermal regime of the East Brawley and Glamis known geothermal resource areas, Salton Trough, California

    SciTech Connect

    Mase, C.W.; Sass, J.H.; Brook, C.A.; Munroe, R.J.

    1981-01-01

    Thermal gradients and thermal conductivities were obtained in real time using an in situ heat-flow technique in 15 shallow (90 to 150 m) wells drilled between Brawley and Glamis in the Imperial Valley, Southern California. The in situ measurements were supplemented by follow-up conventional temperature logs in seven of the wells and by laboratory measurements of thermal conductivity on drill cuttings. The deltaic sedimentary material comprising the upper approx. 100 m of the Salton Trough generally is poorly sorted and high in quartz resulting in quite high thermal conductivities (averaging 2.0 Wm/sup -1/ K/sup -1/ as opposed to 1.2 to 1.7 for typical alluvium). A broad heat-flow anomaly with maximum of about 200 mWm/sup -2/ (approx. 5 HFU) is centered between Glamis and East Brawley and is superimposed on a regional heat-flow high in excess of 100 mWm/sup -2/ (> 2.5 HFU). The heat-flow high corresponds with a gravity maximum and partially with a minimum in electrical resistivity, suggesting the presence of a hydrothermal system at depth in this area.

  5. Recent geothermal developments in the Imperial Valley: Brawley, Salton Sea, Heber

    SciTech Connect

    Papay, L.T.

    1983-01-01

    Imperial Valley programs in geothermal energy are reviewed. The Brawley plant has had a relatively high availability on line since its startup in 1980. The startup at Salton Sea plant was surprisingly smooth. Using these research projects, all of the technical parameters for commercial development of geothermal energy will be known in a year or two. Native brine handling processes, casing materials and configurations, and turbine modifications are being studied. The PUC's decision on the Heber plant was a temporary setback. PUC ruled that projects will not be approved unless they yield competitive busbar costs. The Avoided Cost concept has become the benchmark at PUC. But Avoided Cost does not account for the higher initial design costs and unknown parameters of startup as opposed to mature plant costs. Avoided Cost is seen as the only obstacle to commercial developement in all areas.

  6. The Obsidian Creep Project: Seismic Imaging in the Brawley Seismic Zone and Salton Sea Geothermal Field, Imperial County, California

    NASA Astrophysics Data System (ADS)

    Catchings, R. D.; Rymer, M. J.; Goldman, M.; Lohman, R. B.; McGuire, J. J.

    2010-12-01

    In March 2010, we acquired medium- and high-resolution P- and S-wave seismic reflection and refraction data across faults in the Brawley seismic zone (BSZ) and across part of the Salton Sea Geothermal Field (SSGF), Imperial Valley, California. Our objectives were to determine the dip, possible structural complexities, and seismic velocities associated with the BSZ and SSGF. We acquired multiple seismic data sets along a north-south profile and a high-resolution P-wave profile along an east-west profile. The north-south profile included: 1) a 6.4-km-long P-wave (main) profile that was recorded on 320 Texan seismographs spaced at 20-m intervals, 2) a 1.2-km-long cabled, high-resolution profile along the northern end of the main profile, and 3) an approximately 1.2-km-long S-wave profile along the cabled profile. P-wave sources along the main profile were generated by 0.15- to 0.45-kg buried explosions spaced every 40 m, and P-wave sources along the cabled profile were generated by Betsy-Seisgun ‘shots’ spaced every 10 m. S-waves sources were generated by hammer impacts on the ends of an aluminum block. The east-west profile consisted of a 3.4-km-long high-resolution P-wave seismic profile with shots (Betsy-Seisgun) and geophones spaced every 10 m. Preliminary interpretation of shot gathers from blasts in the north-south profile suggests that the BSZ and SSGF are structurally complex, with abundant faults extending to or near the ground surface. Also, we observe relatively high-velocity material, apparent velocities of about 4.0 km/s in one direction and about 2.8 km/s in another relative to about 1.6 km/s for shallower material, that shallows beneath the SSGF. This may be due to high temperatures and resultant metamorphism of buried materials in the SSGF. From preliminary interpretation of shot gathers along the east-west profile we interpret a prominent fault that extends to the ground surface. This fault is on projection of the Kalin fault, from about 40 m to

  7. Counter guarantee options

    SciTech Connect

    Gunguli, B.

    1995-07-01

    In November 1994, the Government of India announced a set of guidelines which independent power producers (IPPs) would have to follow if they were to receive counter guarantees for their power projects. It simultaneously announced that no further counter guarantees would be given apart from the first eight projects (See {open_quotes}India`s Fast-Track Projects{close_quotes}) where they had already been promised. {open_quotes}No other project, beyond the first eight, will be given a counter guarantee under any circumstance,{close_quotes} says P. Abraham, special secretary in the Ministry of Power.

  8. Report on Preliminary Engineering Study for Installation of an Air Cooled Steam Condenser at Brawley Geothermal Plant, Unit No. 1

    SciTech Connect

    1982-03-01

    The Brawley Geothermal Project comprises a single 10 MW nominal geothermal steam turbine-generator unit which has been constructed and operated by the Southern California Edison Company (SCE). Geothermal steam for the unit is supplied through contract by Union Oil Company which requires the return of all condensate. Irrigation District (IID) purchases the electric power generated and provides irrigation water for cooling tower make-up to the plant for the first-five years of operation, commencing mid-1980. Because of the unavailability of irrigation water from IID in the future, SCE is investigating the application and installation of air cooled heat exchangers in conjunction with the existing wet (evaporative) cooling tower with make-up based on use of 180 gpm (nominal) of the geothermal condensate which may be made available by the steam supplier.

  9. Colorado's Guaranteed Graduate Process.

    ERIC Educational Resources Information Center

    Colorado State Dept. of Education, Denver.

    An overview of the nature, benefits, and steps involved in Colorado's Guaranteed Graduate Program, a process that assures that high school graduates have the knowledge and skills considered essential for entry into employment and postsecondary education, begins this document. A discussion of the portfolio process follows, along with descriptions…

  10. Solyndra Loan Guarantee Announcement

    ScienceCinema

    Vice President Biden and Secretary Chu were joined by California Governor Arnold Schwarzenegger and Solyndra CEO Dr. Chris Grone

    2010-09-01

    Vice President Biden and Secretary Chu were joined by California Governor Arnold Schwarzenegger and Solyndra CEO Dr. Chris Grone to announce that the Department of Energy has finalized a $535 million loan guarantee for Solyndra, Inc., which manufactures innovative cylindrical solar photovoltaic panels that provide clean, renewable energy. The funding will finance construction of the first phase of the company's new manufacturing facility. Solyndra estimates the new plant will initially create 3,000 construction jobs, and lead to as many as 1,000 jobs once the facility opens.

  11. Solyndra Loan Guarantee Announcement

    SciTech Connect

    Vice President Biden and Secretary Chu were joined by California Governor Arnold Schwarzenegger and Solyndra CEO Dr. Chris Grone

    2009-09-09

    Vice President Biden and Secretary Chu were joined by California Governor Arnold Schwarzenegger and Solyndra CEO Dr. Chris Grone to announce that the Department of Energy has finalized a $535 million loan guarantee for Solyndra, Inc., which manufactures innovative cylindrical solar photovoltaic panels that provide clean, renewable energy. The funding will finance construction of the first phase of the company's new manufacturing facility. Solyndra estimates the new plant will initially create 3,000 construction jobs, and lead to as many as 1,000 jobs once the facility opens.

  12. Hydrothermal alteration and tectonic setting of intrusive rocks from East Brawley, Imperial Valley: an application of petrology to geothermal reservoir analysis

    SciTech Connect

    Keskinen, M.; Sternfeld, J.

    1982-01-01

    A geothermal well near East Brawley intersected a series of thin (3 to 35m) diabasic to dioritic intrusives. The petrology and chemistry of these meta-igneous rocks can provide insight into the thermal and fluid chemical characteristics of the reservoir and into the processes of magma generation at depth. A description of the rock types and their hydrothermal alteration is presented in order to increase the petrologic data base relating to this important facet of the geothermal potential of the Salton Trough and to provide a case study illustrating how detailed petrologic examination of well cuttings can provide important input in the construction of a geothermal reservoir model.

  13. The Salton Seismic Imaging Project: Seismic velocity structure of the Brawley Seismic Zone, Salton Buttes and Geothermal Field, Salton Trough, California

    NASA Astrophysics Data System (ADS)

    Delph, J.; Hole, J. A.; Fuis, G. S.; Stock, J. M.; Rymer, M. J.

    2011-12-01

    The Salton Trough is an active rift in southern California in a step-over between the plate-bounding Imperial and San Andreas Faults. In March 2011, the Salton Seismic Imaging Project (SSIP) investigated the rift's crustal structure by acquiring several seismic refraction and reflection lines. One of the densely sampled refraction lines crosses the northern-most Imperial Valley, perpendicular to the strike-slip faults and parallel to a line of small Quaternary rhyolitic volcanoes. The line crosses the obliquely extensional Brawley Seismic Zone and goes through one of the most geothermally productive areas in the United States. Well logs indicate the valley is filled by several kilometers of late Pliocene-recent lacustrine, fluvial, and shallow marine sediment. The 42-km long seismic line was comprised of eleven 110-460 kg explosive shots and receivers at a 100 m spacing. First arrival travel times were used to build a tomographic seismic velocity image of the upper crust. Velocity in the valley increases smoothly from <2 km/s to >5 km/s, indicating diagenesis and gradational metamorphism of rift sediments at very shallow depth due to an elevated geotherm. The velocity gradient is much smaller in the relatively low velocity (<6 km/s) crystalline basement comprised of recently metamorphosed sediment reaching greenschist to lower amphibolite facies. The depth of this basement is about 4-km below the aseismic region of the valley west of the Brawley Seismic Zone, but rises sharply to ~2 km depth beneath the seismically, geothermally, and volcanically active area of the Brawley Seismic Zone. The basement deepens to the northeast of the active tectonic zone and then is abruptly offset to shallower depth on the northeast side of the valley. This offset may be the subsurficial expression of a paleofault, most likely an extension of the Sand Hills Fault, which bounds the basin to the east. Basement velocity east of the fault is ~5.7 km/s, consistent with the granitic rocks

  14. 13 CFR 400.203 - Guarantee percentage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 400.203 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.203 Guarantee percentage. A guarantee issued by the Board may not exceed 85 percent of the amount of the principal of a loan to a Qualified Steel...

  15. 13 CFR 400.203 - Guarantee percentage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 400.203 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.203 Guarantee percentage. A guarantee issued by the Board may not exceed 85 percent of the amount of the principal of a loan to a Qualified Steel...

  16. 13 CFR 400.203 - Guarantee percentage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 400.203 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.203 Guarantee percentage. A guarantee issued by the Board may not exceed 85 percent of the amount of the principal of a loan to a Qualified Steel...

  17. 13 CFR 400.203 - Guarantee percentage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 400.203 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.203 Guarantee percentage. A guarantee issued by the Board may not exceed 85 percent of the amount of the principal of a loan to a Qualified Steel...

  18. 13 CFR 400.203 - Guarantee percentage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 400.203 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.203 Guarantee percentage. A guarantee issued by the Board may not exceed 85 percent of the amount of the principal of a loan to a Qualified Steel...

  19. 22 CFR 221.12 - Guarantee eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Guarantee eligibility. 221.12 Section 221.12 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.12 Guarantee eligibility. (a) Eligible Notes only may be guaranteed...

  20. 22 CFR 221.12 - Guarantee eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Guarantee eligibility. 221.12 Section 221.12 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.12 Guarantee eligibility. (a) Eligible Notes only may be guaranteed...

  1. 22 CFR 221.12 - Guarantee eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Guarantee eligibility. 221.12 Section 221.12 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.12 Guarantee eligibility. (a) Eligible Notes only may be guaranteed...

  2. 22 CFR 221.12 - Guarantee eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Guarantee eligibility. 221.12 Section 221.12 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.12 Guarantee eligibility. (a) Eligible Notes only may be guaranteed...

  3. 22 CFR 221.12 - Guarantee eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Guarantee eligibility. 221.12 Section 221.12 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.12 Guarantee eligibility. (a) Eligible Notes only may be guaranteed...

  4. 7 CFR 1493.60 - Payment guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.60 Payment guarantee. (a) CCC's obligation. The payment guarantee will provide that CCC agrees to pay...

  5. 7 CFR 1493.60 - Payment guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.60 Payment guarantee. (a) CCC's obligation. The payment guarantee will provide that CCC agrees to pay...

  6. 7 CFR 1493.60 - Payment guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.60 Payment guarantee. (a) CCC's obligation. The payment guarantee will provide that CCC agrees to pay...

  7. A new seismogeodetic approach applied to GPS and accelerometer observations of the 2012 Brawley seismic swarm: Implications for earthquake early warning

    NASA Astrophysics Data System (ADS)

    Geng, Jianghui; Bock, Yehuda; Melgar, Diego; Crowell, Brendan W.; Haase, Jennifer S.

    2013-07-01

    The 26 August 2012 Brawley seismic swarm of hundreds of events ranging from M1.4 to M5.5 in the Salton Trough, California provides a unique data set to investigate a new seismogeodetic approach that combines Global Positioning System (GPS) and accelerometer observations to estimate displacement and velocity waveforms. First in simulated real-time mode, we analyzed 1-5 Hz GPS data collected by 17 stations fully encircling the swarm zone at near-source distances up to about 40 km using precise point positioning with ambiguity resolution (PPP-AR). We used a reference network of North American GPS stations well outside the region of deformation to estimate fractional-cycle biases and satellite clock parameters, which were then combined with ultrarapid orbits from the International GNSS Service to estimate positions during the Brawley seismic swarm. Next, we estimated seismogeodetic displacements and velocities from GPS phase and pseudorange observations and 100-200 Hz accelerations collected at three pairs of GPS and seismic stations in close proximity using a new tightly coupled Kalman filter approach as an extension of the PPP-AR process. We can clearly discern body waves in the velocity waveforms, including P-wave arrivals not detectable with the GPS-only approach for earthquake magnitudes as low as Mw 4.6 and significant static offsets for magnitudes as low as Mw 5.4. Our study shows that GPS networks upgraded with strong motion accelerometers can provide new information for improved understanding of the earthquake rupture process and be of critical value in creating a robust early warning system for any earthquake of societal significance.

  8. 22 CFR 221.11 - The Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false The Guarantee. 221.11 Section 221.11 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.11 The Guarantee. Subject to these terms and conditions, the United States of...

  9. 7 CFR 1493.60 - Payment guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103... the payment guarantee or any amendments thereof, are ineligible for GSM-102 or GSM-103 guarantee coverage, except where it is determined by the GSM to be in the best interests of CCC to provide...

  10. 7 CFR 1493.450 - Payment guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... estimated freight and/or insurance costs if the export sale was made on a CFR or CIF basis. Payment by CCC... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee Program Operations § 1493.450 Payment guarantee. (a) CCC's obligation. The payment guarantee will...

  11. 7 CFR 1493.450 - Payment guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... estimated freight and/or insurance costs if the export sale was made on a CFR or CIF basis. Payment by CCC... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee Program Operations § 1493.450 Payment guarantee. (a) CCC's obligation. The payment guarantee will...

  12. 7 CFR 1493.450 - Payment guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... estimated freight and/or insurance costs if the export sale was made on a CFR or CIF basis. Payment by CCC... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee Program Operations § 1493.450 Payment guarantee. (a) CCC's obligation. The payment guarantee will...

  13. 22 CFR 221.11 - The Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false The Guarantee. 221.11 Section 221.11 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.11 The Guarantee. Subject to these terms and conditions, the United States of...

  14. 22 CFR 221.11 - The Guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false The Guarantee. 221.11 Section 221.11 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.11 The Guarantee. Subject to these terms and conditions, the United States of...

  15. 22 CFR 221.11 - The Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false The Guarantee. 221.11 Section 221.11 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.11 The Guarantee. Subject to these terms and conditions, the United States of...

  16. 22 CFR 221.11 - The Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false The Guarantee. 221.11 Section 221.11 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.11 The Guarantee. Subject to these terms and conditions, the United States of...

  17. 7 CFR 1493.60 - Payment guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103... the payment guarantee or any amendments thereof, are ineligible for GSM-102 or GSM-103 guarantee coverage, except where it is determined by the GSM to be in the best interests of CCC to provide...

  18. Regulations: Guaranteed Student Loan Program.

    ERIC Educational Resources Information Center

    1979

    The text is given of the amendments to part 177 of Title 45 of the Code of Federal Regulations, concerning the federal Guaranteed Student Loan program. Subpart A concerns the program's purpose and scope. Subpart B concerns general provisions: definitions, eligibility, permissible charges, refunds, and prohibited transactions. Subpart C addresss…

  19. Guaranteed Loans: Just Plain Expensive

    ERIC Educational Resources Information Center

    Petri, Thomas E.

    2007-01-01

    The investigation of New York State's attorney general, Andrew M. Cuomo, into the questionable practices of lenders in federal student-loan programs has helped raise public awareness of one of the greatest scams in our government: The Federal Family Education Loan program, otherwise known as the guaranteed-student-loan program, is unnecessarily…

  20. 48 CFR 1352.271-88 - Guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prescribed in 48 CFR 1371.119, insert the following clause: Guarantees (APR 2010) (a) In the event any work... redelivery of the vessel, the guarantee period shall run from the date of completion of such item. (d) If...

  1. 48 CFR 1252.217-70 - Guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prescribed at (TAR) 48 CFR 1217.7001(a), insert the following clause: Guarantee (APR 2005) (a) In the event... time of redelivery of the vessel(s), the guarantee period shall run from the date the item is...

  2. 50 CFR 253.11 - Guarantee policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Guarantee policy. 253.11 Section 253.11 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION... § 253.11 Guarantee policy. (a) A guarantee financing or refinancing up to 80 percent of a...

  3. 20 CFR 404.230 - Guaranteed alternative.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Guaranteed alternative. 404.230 Section 404... INSURANCE (1950- ) Computing Primary Insurance Amounts Guaranteed Alternative for People Reaching Age 62 After 1978 But Before 1984 § 404.230 Guaranteed alternative. (a) General. If you reach age 62 after...

  4. 20 CFR 404.230 - Guaranteed alternative.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Guaranteed alternative. 404.230 Section 404... INSURANCE (1950- ) Computing Primary Insurance Amounts Guaranteed Alternative for People Reaching Age 62 After 1978 But Before 1984 § 404.230 Guaranteed alternative. (a) General. If you reach age 62 after...

  5. 20 CFR 404.230 - Guaranteed alternative.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Guaranteed alternative. 404.230 Section 404... INSURANCE (1950- ) Computing Primary Insurance Amounts Guaranteed Alternative for People Reaching Age 62 After 1978 But Before 1984 § 404.230 Guaranteed alternative. (a) General. If you reach age 62 after...

  6. 20 CFR 404.230 - Guaranteed alternative.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Guaranteed alternative. 404.230 Section 404... INSURANCE (1950- ) Computing Primary Insurance Amounts Guaranteed Alternative for People Reaching Age 62 After 1978 But Before 1984 § 404.230 Guaranteed alternative. (a) General. If you reach age 62 after...

  7. 20 CFR 404.230 - Guaranteed alternative.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Guaranteed alternative. 404.230 Section 404... INSURANCE (1950- ) Computing Primary Insurance Amounts Guaranteed Alternative for People Reaching Age 62 After 1978 But Before 1984 § 404.230 Guaranteed alternative. (a) General. If you reach age 62 after...

  8. 27 CFR 6.61 - Guaranteeing loans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2011-04-01 2011-04-01 false Guaranteeing loans. 6.61 Section 6.61 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS âTIED-HOUSEâ Unlawful Inducements Guaranteeing Loans § 6.61 Guaranteeing loans. The act by an industry member...

  9. 27 CFR 6.61 - Guaranteeing loans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2012-04-01 2012-04-01 false Guaranteeing loans. 6.61 Section 6.61 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS âTIED-HOUSEâ Unlawful Inducements Guaranteeing Loans § 6.61 Guaranteeing loans. The act by an industry member...

  10. 27 CFR 6.61 - Guaranteeing loans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2014-04-01 2014-04-01 false Guaranteeing loans. 6.61 Section 6.61 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY ALCOHOL âTIED-HOUSEâ Unlawful Inducements Guaranteeing Loans § 6.61 Guaranteeing loans. The act by an industry member...

  11. 27 CFR 6.61 - Guaranteeing loans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Guaranteeing loans. 6.61 Section 6.61 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS âTIED-HOUSEâ Unlawful Inducements Guaranteeing Loans § 6.61 Guaranteeing loans. The act by an industry member...

  12. 27 CFR 6.61 - Guaranteeing loans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2013-04-01 2013-04-01 false Guaranteeing loans. 6.61 Section 6.61 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY ALCOHOL âTIED-HOUSEâ Unlawful Inducements Guaranteeing Loans § 6.61 Guaranteeing loans. The act by an industry member...

  13. 14 CFR 1300.14 - Guarantee percentage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Guarantee percentage. 1300.14 Section 1300.14 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET... § 1300.14 Guarantee percentage. A guarantee issued by the Board must be less than 100 percent of...

  14. 14 CFR 1300.14 - Guarantee percentage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Guarantee percentage. 1300.14 Section 1300.14 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET... § 1300.14 Guarantee percentage. A guarantee issued by the Board must be less than 100 percent of...

  15. 14 CFR 1300.14 - Guarantee percentage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Guarantee percentage. 1300.14 Section 1300.14 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET... § 1300.14 Guarantee percentage. A guarantee issued by the Board must be less than 100 percent of...

  16. 14 CFR 1300.14 - Guarantee percentage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Guarantee percentage. 1300.14 Section 1300.14 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET... § 1300.14 Guarantee percentage. A guarantee issued by the Board must be less than 100 percent of...

  17. 13 CFR 115.68 - Guarantee percentage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 115.68 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SURETY BOND GUARANTEE Preferred Surety Bond (PSB) Guarantees § 115.68 Guarantee percentage. SBA reimburses a PSB Surety in an amount not to exceed 70% of the Loss incurred and paid. Where the total Contract or Order...

  18. 22 CFR 232.03 - The Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false The Guarantee. 232.03 Section 232.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REPUBLIC OF TUNISIA LOAN GUARANTEES ISSUED UNDER THE...-74-STANDARD TERMS AND CONDITIONS § 232.03 The Guarantee. Subject to the terms and conditions set...

  19. 22 CFR 231.03 - The Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false The Guarantee. 231.03 Section 231.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE... § 231.03 The Guarantee. Subject to the terms and conditions set out in this part, the United States...

  20. 22 CFR 232.03 - The Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false The Guarantee. 232.03 Section 232.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REPUBLIC OF TUNISIA LOAN GUARANTEES ISSUED UNDER THE...-74-STANDARD TERMS AND CONDITIONS § 232.03 The Guarantee. Subject to the terms and conditions set...

  1. 22 CFR 231.03 - The Guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false The Guarantee. 231.03 Section 231.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE... § 231.03 The Guarantee. Subject to the terms and conditions set out in this part, the United States...

  2. 22 CFR 231.03 - The Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false The Guarantee. 231.03 Section 231.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE... § 231.03 The Guarantee. Subject to the terms and conditions set out in this part, the United States...

  3. 22 CFR 231.03 - The Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false The Guarantee. 231.03 Section 231.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE... § 231.03 The Guarantee. Subject to the terms and conditions set out in this part, the United States...

  4. 13 CFR 115.68 - Guarantee percentage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 115.68 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SURETY BOND GUARANTEE Preferred Surety Bond (PSB) Guarantees § 115.68 Guarantee percentage. SBA reimburses a PSB Surety in an amount not to exceed 70% of the Loss incurred and paid. Where the total Contract or Order...

  5. 13 CFR 115.68 - Guarantee percentage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 115.68 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SURETY BOND GUARANTEE Preferred Surety Bond (PSB) Guarantees § 115.68 Guarantee percentage. SBA reimburses a PSB Surety in an amount not to exceed 70% of the Loss incurred and paid. Where the total Contract or Order...

  6. 13 CFR 115.68 - Guarantee percentage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 115.68 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SURETY BOND GUARANTEE Preferred Surety Bond (PSB) Guarantees § 115.68 Guarantee percentage. SBA reimburses a PSB Surety in an amount not to exceed 70% of the Loss incurred and paid. Where the total Contract or Order...

  7. 13 CFR 115.68 - Guarantee percentage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 115.68 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SURETY BOND GUARANTEE Preferred Surety Bond (PSB) Guarantees § 115.68 Guarantee percentage. SBA reimburses a PSB Surety in an amount not to exceed 70% of the Loss incurred and paid. Where the total Contract or Order...

  8. 7 CFR 1720.14 - Nature of guarantee; acceleration of guaranteed bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the terms and conditions of the bond documents; (3) The guarantee fee required by 7 CFR 1720.10 of... requirements listed in 7 CFR 1720.12; or (5) The guaranteed lender failed to comply with any material covenant... 7 Agriculture 11 2011-01-01 2011-01-01 false Nature of guarantee; acceleration of guaranteed...

  9. 7 CFR 3575.64 - Issuance of Lender's Agreement, Loan Note Guarantee, and Assignment Guarantee Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Programs Guaranteed Loans § 3575.64 Issuance of Lender's Agreement, Loan Note Guarantee, and Assignment... 7 Agriculture 15 2011-01-01 2011-01-01 false Issuance of Lender's Agreement, Loan Note Guarantee, and Assignment Guarantee Agreement. 3575.64 Section 3575.64 Agriculture Regulations of the...

  10. 7 CFR 1779.64 - Issuance of Lender's Agreement, Loan Note Guarantee, and Assignment Guarantee Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... WASTE DISPOSAL PROGRAMS GUARANTEED LOANS § 1779.64 Issuance of Lender's Agreement, Loan Note Guarantee... 7 Agriculture 12 2011-01-01 2011-01-01 false Issuance of Lender's Agreement, Loan Note Guarantee, and Assignment Guarantee Agreement. 1779.64 Section 1779.64 Agriculture Regulations of the...

  11. 7 CFR 1720.14 - Nature of guarantee; acceleration of guaranteed bonds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the terms and conditions of the bond documents; (3) The guarantee fee required by 7 CFR 1720.10 of... requirements listed in 7 CFR 1720.12; or (5) The guaranteed lender failed to comply with any material covenant... 7 Agriculture 11 2014-01-01 2014-01-01 false Nature of guarantee; acceleration of guaranteed...

  12. 7 CFR 1720.14 - Nature of guarantee; acceleration of guaranteed bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the terms and conditions of the bond documents; (3) The guarantee fee required by 7 CFR 1720.10 of... requirements listed in 7 CFR 1720.12; or (5) The guaranteed lender failed to comply with any material covenant... 7 Agriculture 11 2010-01-01 2010-01-01 false Nature of guarantee; acceleration of guaranteed...

  13. 7 CFR 1720.14 - Nature of guarantee; acceleration of guaranteed bonds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the terms and conditions of the bond documents; (3) The guarantee fee required by 7 CFR 1720.10 of... requirements listed in 7 CFR 1720.12; or (5) The guaranteed lender failed to comply with any material covenant... 7 Agriculture 11 2012-01-01 2012-01-01 false Nature of guarantee; acceleration of guaranteed...

  14. 7 CFR 1720.14 - Nature of guarantee; acceleration of guaranteed bonds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the terms and conditions of the bond documents; (3) The guarantee fee required by 7 CFR 1720.10 of... requirements listed in 7 CFR 1720.12; or (5) The guaranteed lender failed to comply with any material covenant... 7 Agriculture 11 2013-01-01 2013-01-01 false Nature of guarantee; acceleration of guaranteed...

  15. 78 FR 691 - Guarantee Fee Rates for Guaranteed Loans for Fiscal Year 2013; Maximum Portion of Guarantee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ...As set forth in 7 CFR 4279.107, the Agency has the authority to charge an initial guarantee fee and an annual renewal fee for loans made under the Business and Industry (B&I) Guaranteed Loan Program. Pursuant to that authority, the Agency is establishing the renewal fee rate at one-half of 1 percent for the B&I Guaranteed Loan Program. This rate will apply to all loans obligated in Fiscal Year......

  16. 78 FR 76593 - Guarantee Fee Rates for Guaranteed Loans for Fiscal Year 2014; Maximum Portion of Guarantee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ... decline and job deterioration, remain persistently poor, are experiencing trauma as a result of natural disaster, or are experiencing fundamental structural changes in its economic base. For guaranteed...

  17. Fault History and Architecture of the Southernmost San Andreas Fault and Brawley Seismic Zone: New Constraints from CHIRP Data Acquired in the Salton Sea

    NASA Astrophysics Data System (ADS)

    Brothers, D.; Seitz, G.; Williams, P.; Driscoll, N.; Kent, G.

    2006-12-01

    The Salton Trough is the boundary between spreading-center dominated extension in the Gulf of California and dextral strike-slip deformation along the San Andreas Fault (SAF) system. The Salton Trough provides an ideal opportunity to image this transition in modes of deformation. The critical portion of this system, namely the intersection of the SAF and the Brawley Seismic Zone (BSZ) in the southern Salton Sea has not been imaged by geophysical methods. To address this problem, we conducted a pilot, high-resolution seismic CHIRP survey in the Salton Sea offshore Bombay Beach. CHIRP imaging, together with onshore field mapping and paleoseismic investigations, has the potential to define the interaction between the SAF and the BSZ, as well as delineate fault architecture and strain partitioning in the central Salton Trough. Preliminary onshore examination of Lake Cahuilla sediments reveal lake-level changes and earthquake event chronology for the last ~1,000 years, and suggest a relatively long period of seismic quiescence for the southern SAF preceded by several events with shorter recurrence intervals. Fault excavations have revealed several lake episodes separated by terrestrial horizons that include distinct features such as mud-cracks. New CHIRP data show potential correlation of faulted offshore stratigraphy with paleoseismic deformation documented at an excavation site 15 km to the north adjacent to Salt Creek. Profiles image a well-defined fault trending obliquely to the strike of the onshore SAF, and the observed trend is sub-parallel to the BSZ. Offset stratigraphy across the fault imaged in CHIRP profiles increases with depth, with a maximum vertical offset of ~6-8 m. Relief of ~.5 m exists across the post-1905 surface and most likely represents deposition mantling an older scarp. Assuming high amplitude reflectors observed in CHIRP data correlate with lowered lake levels associated with weathering and/or desiccation horizons, then we can correlate the

  18. 7 CFR 4279.107 - Guarantee fees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Guarantee fees. 4279.107 Section 4279.107 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry Loans §...

  19. 7 CFR 4279.107 - Guarantee fees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Guarantee fees. 4279.107 Section 4279.107 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry Loans §...

  20. 7 CFR 4279.107 - Guarantee fees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Guarantee fees. 4279.107 Section 4279.107 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry Loans §...

  1. 7 CFR 4279.107 - Guarantee fees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Guarantee fees. 4279.107 Section 4279.107 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry Loans §...

  2. 46 CFR 298.36 - Guarantee Fee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Security Agreement and prior to the delivery date of a Vessel or Shipyard Project, we shall charge a... periods beginning with the delivery date of a Vessel or Shipyard Project, the Guarantee Fee shall be set... method of calculation of the Guarantee Fee, upon an evaluation of the aggregate security for...

  3. 29 CFR 4022.3 - Guaranteed benefits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Guaranteed benefits. 4022.3 Section 4022.3 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION COVERAGE AND BENEFITS BENEFITS PAYABLE IN TERMINATED SINGLE-EMPLOYER PLANS General Provisions; Guaranteed Benefits § 4022.3...

  4. 22 CFR 230.03 - The Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false The Guarantee. 230.03 Section 230.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND CONDITIONS § 230.03 The...

  5. 22 CFR 230.04 - Guarantee eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Guarantee eligibility. 230.04 Section 230.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND CONDITIONS §...

  6. 13 CFR 115.31 - Guarantee percentage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... bond, the guarantee percentage decreases by one percentage point for each $5,000 of increase or part...'s share of the Loss is limited to that percentage of the increased Contract or Order amount that the... a Contract amount increases to $2,100,000, SBA's share of the Loss under an 80% guarantee is...

  7. 42 CFR 422.390 - Guarantees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Guarantees. 422.390 Section 422.390 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Provider-Sponsored Organizations § 422.390 Guarantees. (a)...

  8. 42 CFR 422.390 - Guarantees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Guarantees. 422.390 Section 422.390 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM (CONTINUED) MEDICARE ADVANTAGE PROGRAM Provider-Sponsored Organizations § 422.390 Guarantees....

  9. 42 CFR 422.390 - Guarantees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Guarantees. 422.390 Section 422.390 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM (CONTINUED) MEDICARE ADVANTAGE PROGRAM Provider-Sponsored Organizations § 422.390 Guarantees....

  10. 19 CFR 351.506 - Loan guarantees.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Loan guarantees. 351.506 Section 351.506 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING DUTIES Identification and Measurement of Countervailable Subsidies § 351.506 Loan guarantees. (a) Benefit—(1) In...

  11. 19 CFR 351.506 - Loan guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Loan guarantees. 351.506 Section 351.506 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING DUTIES Identification and Measurement of Countervailable Subsidies § 351.506 Loan guarantees. (a) Benefit—(1) In...

  12. 19 CFR 351.506 - Loan guarantees.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Loan guarantees. 351.506 Section 351.506 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING DUTIES Identification and Measurement of Countervailable Subsidies § 351.506 Loan guarantees. (a) Benefit—(1) In...

  13. 19 CFR 351.506 - Loan guarantees.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Loan guarantees. 351.506 Section 351.506 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING DUTIES Identification and Measurement of Countervailable Subsidies § 351.506 Loan guarantees. (a) Benefit—(1) In...

  14. 19 CFR 351.506 - Loan guarantees.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Loan guarantees. 351.506 Section 351.506 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING DUTIES Identification and Measurement of Countervailable Subsidies § 351.506 Loan guarantees. (a) Benefit—(1) In general. In the case of a loan...

  15. 22 CFR 233.03 - The Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false The Guarantee. 233.03 Section 233.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT HASHEMITE KINGDOM OF JORDAN LOAN GUARANTEES ISSUED UNDER THE FURTHER CONTINUING APPROPRIATIONS ACT, 2013, DIV. F, PUB. L. 113-6-STANDARD TERMS AND CONDITIONS §...

  16. 22 CFR 233.04 - Guarantee eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Guarantee eligibility. 233.04 Section 233.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT HASHEMITE KINGDOM OF JORDAN LOAN GUARANTEES ISSUED UNDER THE FURTHER CONTINUING APPROPRIATIONS ACT, 2013, DIV. F, PUB. L. 113-6-STANDARD TERMS...

  17. 14 CFR 1300.13 - Guarantee amount.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Guarantee amount. 1300.13 Section 1300.13 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and Application Procedures §...

  18. 14 CFR 1300.21 - Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Guarantee. 1300.21 Section 1300.21 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and Application Procedures §...

  19. 14 CFR 1300.21 - Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Guarantee. 1300.21 Section 1300.21 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and Application Procedures §...

  20. 14 CFR 1300.13 - Guarantee amount.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Guarantee amount. 1300.13 Section 1300.13 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and Application Procedures §...

  1. 22 CFR 232.04 - Guarantee eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Guarantee eligibility. 232.04 Section 232.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REPUBLIC OF TUNISIA LOAN GUARANTEES ISSUED UNDER THE DEPARTMENT OF STATE, FOREIGN OPERATIONS, AND RELATED PROGRAMS APPROPRIATIONS ACT, 2012, DIV....

  2. 7 CFR 1493.450 - Payment guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... was made on a CFR or CIF basis. Payment by CCC will be in U.S. dollars. (b) Period of guarantee... coverage under this subpart, except where it is determined by the GSM to be in the best interests of CCC to... the GSM. Such additional terms, conditions or qualifications, as stated in the payment guarantee...

  3. 48 CFR 928.101 - Bid guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Bid guarantees. 928.101 Section 928.101 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 928.101 Bid guarantees....

  4. 48 CFR 928.101 - Bid guarantees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Bid guarantees. 928.101 Section 928.101 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 928.101 Bid guarantees....

  5. 22 CFR 230.04 - Guarantee eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Financial Officer, Assistant Administrator and Deputy, Bureau for Economic Growth, Agriculture and Trade... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Guarantee eligibility. 230.04 Section 230.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE...

  6. 22 CFR 230.04 - Guarantee eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Financial Officer, Assistant Administrator and Deputy, Bureau for Economic Growth, Agriculture and Trade... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Guarantee eligibility. 230.04 Section 230.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE...

  7. 22 CFR 230.04 - Guarantee eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Financial Officer, Assistant Administrator and Deputy, Bureau for Economic Growth, Agriculture and Trade... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Guarantee eligibility. 230.04 Section 230.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE...

  8. 22 CFR 230.04 - Guarantee eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Financial Officer, Assistant Administrator and Deputy, Bureau for Economic Growth, Agriculture and Trade... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Guarantee eligibility. 230.04 Section 230.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE...

  9. 22 CFR 232.04 - Guarantee eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Guarantee eligibility. 232.04 Section 232.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REPUBLIC OF TUNISIA LOAN GUARANTEES ISSUED UNDER THE DEPARTMENT OF STATE, FOREIGN OPERATIONS, AND RELATED PROGRAMS APPROPRIATIONS ACT, 2012, DIV....

  10. 29 CFR 4022.3 - Guaranteed benefits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Guaranteed benefits. 4022.3 Section 4022.3 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION COVERAGE AND BENEFITS BENEFITS PAYABLE IN TERMINATED SINGLE-EMPLOYER PLANS General Provisions; Guaranteed Benefits § 4022.3...

  11. 29 CFR 4022.3 - Guaranteed benefits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Guaranteed benefits. 4022.3 Section 4022.3 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION COVERAGE AND BENEFITS BENEFITS PAYABLE IN TERMINATED SINGLE-EMPLOYER PLANS General Provisions; Guaranteed Benefits § 4022.3...

  12. 29 CFR 4022.3 - Guaranteed benefits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Guaranteed benefits. 4022.3 Section 4022.3 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION COVERAGE AND BENEFITS BENEFITS PAYABLE IN TERMINATED SINGLE-EMPLOYER PLANS General Provisions; Guaranteed Benefits § 4022.3...

  13. 29 CFR 4022.3 - Guaranteed benefits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Guaranteed benefits. 4022.3 Section 4022.3 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION COVERAGE AND BENEFITS BENEFITS PAYABLE IN TERMINATED SINGLE-EMPLOYER PLANS General Provisions; Guaranteed Benefits § 4022.3...

  14. 22 CFR 230.03 - The Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false The Guarantee. 230.03 Section 230.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND CONDITIONS § 230.03 The...

  15. 22 CFR 230.03 - The Guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false The Guarantee. 230.03 Section 230.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND CONDITIONS § 230.03 The...

  16. 22 CFR 230.03 - The Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false The Guarantee. 230.03 Section 230.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND CONDITIONS § 230.03 The...

  17. 22 CFR 230.03 - The Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false The Guarantee. 230.03 Section 230.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND CONDITIONS § 230.03 The...

  18. What Guarantees Should Society Offer Its Youth?

    ERIC Educational Resources Information Center

    Brooks, Chris

    2014-01-01

    Criticising the concept of a "youth guarantee" as it was understood by the OECD in the 1990s and recently again by the European Community, the author argues that just more schooling and training will not help, let alone guarantee a future for disadvantaged, unemployed young people. Rather any policy that wants to help youth to become…

  19. 22 CFR 231.04 - Guarantee eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Guarantee eligibility. 231.04 Section 231.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW 108-11-STANDARD TERMS...

  20. 22 CFR 231.04 - Guarantee eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Guarantee eligibility. 231.04 Section 231.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW 108-11-STANDARD TERMS...

  1. 22 CFR 231.03 - The Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false The Guarantee. 231.03 Section 231.03 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW 108-11-STANDARD TERMS AND...

  2. 22 CFR 231.04 - Guarantee eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Guarantee eligibility. 231.04 Section 231.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW 108-11-STANDARD TERMS...

  3. 22 CFR 231.04 - Guarantee eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Guarantee eligibility. 231.04 Section 231.04 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW 108-11-STANDARD TERMS...

  4. 7 CFR 1980.323 - Guarantee fee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 14 2011-01-01 2011-01-01 false Guarantee fee. 1980.323 Section 1980.323 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... REGULATIONS (CONTINUED) GENERAL Rural Housing Loans § 1980.323 Guarantee fee. The Lender will pay...

  5. 7 CFR 1493.450 - Payment guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... was made on a CFR or CIF basis. Payment by CCC will be in U.S. dollars. (b) Period of guarantee... coverage under this subpart, except where it is determined by the GSM to be in the best interests of CCC to... the GSM. Such additional terms, conditions or qualifications, as stated in the payment guarantee...

  6. Marketing service guarantees for health care.

    PubMed

    Levy, J S

    1999-01-01

    The author introduces the concept of service guarantees for application in health care and differentiates between explicit, implicit, and conditional vs. unconditional types of guarantees. An example of an unconditional guarantee of satisfaction is provided by the hospitality industry. Firms conveying an implicit guarantee are those with outstanding reputations for products such as luxury automobiles, or ultimate customer service, like Nordstrom. Federal Express and Domino's Pizza offer explicit guarantees of on-time delivery. Taking this concept into efforts to improve health care delivery involves a number of caveats. Customers invited to use exceptional service cards may use these to record either satisfaction or dissatisfaction. The cards need to provide enough specific information about issues so that "immediate action could be taken to improve processes." Front-line employees should be empowered to respond to complaints in a meaningful way to resolve the problem before the client leaves the premises. PMID:10711165

  7. Green optical networks with connection availability guarantee.

    PubMed

    Zhang, Xiaoning; Tan, Shufang

    2015-06-29

    In this paper, we study green optical networks with connection availability guarantee. After introducing a power consumption model for green optical network design, we propose a design method called Availability-Guaranteed Energy-Efficient Design (AGEED). In AGEED, we employ dedicated path protection as backup capacity in order to improve connection availability. Based on iterative routing by modifying link weights, we can make idle network resources be switched into sleep mode, and obtain the energy saving effect. Our simulation results show that AGEED is more advantageous to achieve energy-efficient purpose and guarantee the satisfied connection availability levels in comparison with other methods. PMID:26191755

  8. 76 FR 39068 - Guarantee Fee Rates for Guaranteed Loans for Fiscal Year 2011; Maximum Portion of Guarantee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ...As set forth in 7 CFR 4279.107(b), Rural Development (the Agency) has the authority to charge an annual renewal fee for loans made under the Business and Industry (B&I) Guaranteed Loan Program. Pursuant to that authority, the Agency is establishing the renewal fee rate at one-fourth of 1 percent for the B&I Guaranteed Loan Program. This rate will apply to all loans obligated in Fiscal Year......

  9. 77 FR 5759 - Guarantee Fee Rates for Guaranteed Loans for Fiscal Year 2012; Maximum Portion of Guarantee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ...As set forth in 7 CFR 4279.107(b), the Agency has the authority to charge an annual renewal fee for loans made under the Business and Industry (B&I) Guaranteed Loan Program. Pursuant to that authority, the Agency is establishing the renewal fee rate at one- fourth of 1 percent for the B&I Guaranteed Loan Program. This rate will apply to all loans obligated in Fiscal Year 2012 that are made......

  10. 13 CFR 400.208 - Issuance of the Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Issuance of the Guarantee. 400.208 Section 400.208 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.208 Issuance of the Guarantee. (a) The Board's...

  11. 13 CFR 400.208 - Issuance of the Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Issuance of the Guarantee. 400.208 Section 400.208 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.208 Issuance of the Guarantee. (a) The Board's...

  12. 13 CFR 400.208 - Issuance of the Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Issuance of the Guarantee. 400.208 Section 400.208 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.208 Issuance of the Guarantee. (a) The Board's...

  13. 13 CFR 400.208 - Issuance of the Guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Issuance of the Guarantee. 400.208 Section 400.208 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.208 Issuance of the Guarantee. (a) The Board's...

  14. 13 CFR 400.208 - Issuance of the Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Issuance of the Guarantee. 400.208 Section 400.208 Business Credit and Assistance EMERGENCY STEEL GUARANTEE LOAN BOARD EMERGENCY STEEL GUARANTEE LOAN PROGRAM Steel Guarantee Loans § 400.208 Issuance of the Guarantee. (a) The Board's...

  15. 46 CFR Sec. 11 - Guarantee obligations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 11 Guarantee obligations. (a) Under the provisions of Article 10 of the NSA-LUMPSUMREP...

  16. 46 CFR Sec. 11 - Guarantee obligations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 11 Guarantee obligations. (a) Under the provisions of Article 10 of the NSA-LUMPSUMREP...

  17. 46 CFR Sec. 11 - Guarantee obligations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 11 Guarantee obligations. (a) Under the provisions of Article 10 of the NSA-LUMPSUMREP...

  18. 46 CFR Sec. 11 - Guarantee obligations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 11 Guarantee obligations. (a) Under the provisions of Article 10 of the NSA-LUMPSUMREP...

  19. 46 CFR Sec. 11 - Guarantee obligations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 11 Guarantee obligations. (a) Under the provisions of Article 10 of the NSA-LUMPSUMREP...

  20. Understanding consumer response to service guarantees

    SciTech Connect

    Taylor, E.L.; Cole, J.M.

    1999-10-01

    Whether the goal is customer loyalty to a competitive energy service provider or customer satisfaction with monopoly distribution services, service guarantees must be seen as one way a company can communicate with its customers about the relationship it has (or wants) with them. In short, service guarantees must be evaluated as part of a company's overall brand management strategy. To do this, a conceptual framework within which to develop and link models of service delivery and brand management is needed. This means seeing both as examples of inference management. In this article the authors first interpret findings from their research on utility service guarantees in light of the model of service delivery proposed by Smith, Bolton, and Wagner. The authors then situate this model within their own model of utility brand management. The resulting approach can be used by a utility to evaluate whether and how to adopt service guarantees as part of its overall branding strategy.

  1. Geothermal Loan Guarantee Program: need for improvements

    SciTech Connect

    Staats, E.B.

    1980-01-24

    The progress and management of the Department of Energy's geothermal loan guarantee program are discussed. Recommendations for improving the program and matters for consideration by the Congress are included. (MHR)

  2. 7 CFR 4279.107 - Guarantee fees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... guarantee fee may be reduced to 1 percent if the borrower's business supports value-added agriculture and... structural changes in its economic base. (b) Annual renewal fee. The annual renewal fee is paid once a...

  3. 7 CFR 1735.32 - Guaranteed loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Guaranteed loans may be made simultaneously with hardship loans or concurrent RUS cost-of-money and RTB loans... with the engineering and economic feasibility of the project and approves the borrower's choice...

  4. 12 CFR 1808.400 - Notice of Guarantee Availability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 1808.400 Banks and Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS BOND GUARANTEE PROGRAM Applications for Guarantee and... Qualified Issuer Applications and Guarantee Applications in accordance with this interim rule and...

  5. Guaranteed Student Loan Program 1981. State Agency Survey.

    ERIC Educational Resources Information Center

    New York State Higher Education Services Corp., Albany.

    Responses to a questionnaire circulated in March 1981 are summarized. Data were gathered from all states regarding the federal Guaranteed Student Loan Program (GSL) and the state guarantee agencies on: guarantee agency organizational types; dates of GSL agreements with the Department of Education; states that guaranteed loans before GSL;…

  6. 22 CFR 221.14 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Transferability of Guarantee; Note Register. 221.14 Section 221.14 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.14 Transferability of Guarantee; Note Register....

  7. 22 CFR 221.14 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Transferability of Guarantee; Note Register. 221.14 Section 221.14 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.14 Transferability of Guarantee; Note Register....

  8. 22 CFR 221.14 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Transferability of Guarantee; Note Register. 221.14 Section 221.14 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.14 Transferability of Guarantee; Note Register....

  9. 22 CFR 221.14 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Transferability of Guarantee; Note Register. 221.14 Section 221.14 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.14 Transferability of Guarantee; Note Register....

  10. 22 CFR 221.14 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Transferability of Guarantee; Note Register. 221.14 Section 221.14 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.14 Transferability of Guarantee; Note Register....

  11. 24 CFR 1007.75 - Payment under guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Payment under guarantee. 1007.75... DEVELOPMENT SECTION 184A LOAN GUARANTEES FOR NATIVE HAWAIIAN HOUSING § 1007.75 Payment under guarantee. (a) Lender options—(1) Notification. If a borrower on a loan guaranteed under this part defaults on the...

  12. 24 CFR 1007.75 - Payment under guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Payment under guarantee. 1007.75... DEVELOPMENT SECTION 184A LOAN GUARANTEES FOR NATIVE HAWAIIAN HOUSING § 1007.75 Payment under guarantee. (a) Lender options—(1) Notification. If a borrower on a loan guaranteed under this part defaults on the...

  13. 24 CFR 1007.60 - Liability under guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Liability under guarantee. 1007.60... DEVELOPMENT SECTION 184A LOAN GUARANTEES FOR NATIVE HAWAIIAN HOUSING § 1007.60 Liability under guarantee. The liability under a guarantee provided under this section shall decrease or increase on a pro rata...

  14. 24 CFR 1007.60 - Liability under guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Liability under guarantee. 1007.60... DEVELOPMENT SECTION 184A LOAN GUARANTEES FOR NATIVE HAWAIIAN HOUSING § 1007.60 Liability under guarantee. The liability under a guarantee provided under this section shall decrease or increase on a pro rata...

  15. 7 CFR 1493.70 - Guarantee rates and fees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103... consideration. A current schedule of the guarantee fee rates charged by CCC under GSM-102 and GSM-103 will be... the guarantee fee will not be made after approval unless the GSM determines that such refund will...

  16. 7 CFR 2201.22 - Issuance of Guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Issuance of Guarantees. 2201.22 Section 2201.22 Agriculture Regulations of the Department of Agriculture (Continued) LOCAL TELEVISION LOAN GUARANTEE BOARD LOCAL TELEVISION LOAN GUARANTEE PROGRAM-PROGRAM REGULATIONS Loan Guarantees § 2201.22 Issuance...

  17. 7 CFR 1493.460 - Guarantee rates and fees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee... not be approved until the guarantee fee has been received by CCC. The exporter's check for the guarantee fee shall be made payable to CCC and mailed or delivered by courier to the office specified in...

  18. 7 CFR 1493.460 - Guarantee rates and fees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC... the guarantee fee. Applications will not be approved until the guarantee fee has been received by CCC. The exporter's check for the guarantee fee shall be made payable to CCC and mailed or delivered...

  19. 7 CFR 1493.460 - Guarantee rates and fees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee... not be approved until the guarantee fee has been received by CCC. The exporter's check for the guarantee fee shall be made payable to CCC and mailed or delivered by courier to the office specified in...

  20. 7 CFR 1493.460 - Guarantee rates and fees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC... the guarantee fee. Applications will not be approved until the guarantee fee has been received by CCC. The exporter's check for the guarantee fee shall be made payable to CCC and mailed or delivered...

  1. 7 CFR 1493.460 - Guarantee rates and fees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee... not be approved until the guarantee fee has been received by CCC. The exporter's check for the guarantee fee shall be made payable to CCC and mailed or delivered by courier to the office specified in...

  2. 7 CFR 1493.70 - Guarantee rates and fees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103... consideration. A current schedule of the guarantee fee rates charged by CCC under GSM-102 and GSM-103 will be... the guarantee fee will not be made after approval unless the GSM determines that such refund will...

  3. 76 FR 8403 - Biorefinery Assistance Guaranteed Loans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... and guaranteed loans were serviced according to the provisions in the November 20, 2008 (73 FR 70544), March 12, 2010 (75 FR 11840), or the May 6, 2010 (75 FR ] 25076) Federal Register notice, as applicable... and Responses The proposed rule was published in the Federal Register on April 16, 2010 (75 FR...

  4. 48 CFR 970.0970 - Performance guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970...

  5. 14 CFR 1214.811 - Reflight guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Reflight guarantee. 1214.811 Section 1214.811 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Reimbursement for... Shuttle launch to 160 nmi, 28.5° as defined in the Shuttle policy and all dedicated-flight...

  6. 14 CFR 1214.811 - Reflight guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Reflight guarantee. 1214.811 Section 1214.811 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Reimbursement for... Shuttle launch to 160 nmi, 28.5° as defined in the Shuttle policy and all dedicated-flight...

  7. 14 CFR 1214.811 - Reflight guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Reflight guarantee. 1214.811 Section 1214.811 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Reimbursement for... Shuttle launch to 160 nmi, 28.5° as defined in the Shuttle policy and all dedicated-flight...

  8. 14 CFR 1214.811 - Reflight guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Reflight guarantee. 1214.811 Section 1214.811 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Reimbursement for... Shuttle launch to 160 nmi, 28.5° as defined in the Shuttle policy and all dedicated-flight...

  9. 76 FR 30641 - Notice of Funding Availability (NOFA) for Loan Guarantees Under Section 538 Guaranteed Rural...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-26

    ... the loan guarantee, including Home Investment Partnership Program (HOME) grant funds, tax exempt bonds... (NEPA) and completed Form RD 3565-1 for the selected project. The Agency will prioritize the...

  10. 78 FR 30854 - Notice of Funding Availability (NOFA) for Loan Guarantees Under Section 538 Guaranteed Rural...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ...This is a request for proposals for guaranteed loans under the Section 538 Guaranteed Rural Rental Housing Program (GRRHP) pursuant to 7 CFR 3565.4 for Fiscal Year (FY) 2013. The Consolidated and Further Continuing Appropriations Act, 2013, Public Law 113-6 (March 26, 2013) appropriated $150 million in FY 2013. The commitment of program dollars will be made first to approved and complete......

  11. Improved precision-guaranteed quantum tomography

    NASA Astrophysics Data System (ADS)

    Sugiyama, Takanori

    Quantum tomography is one of the standard tool in current quantum information experiments for verifying that a state/process/measurement prepared in the lab is close to an ideal target. Precision-guaranteed quantum tomography (Sugiyama, Turner, Murao, PRL 111, 160406 2013) gives rigorous error bars on a result estimated from arbitrary finite data sets from any given informationally complete tomography experiments. The rigorous error bars were derived with a real-valued concentration inequality called Hoeffding's inequality. In this talk, with a vector-valued concentration inequality, we provide an improved version of the error bars of precision-guaranteed quantum tomography. We examine the new error bars for specific cases of multi-qubit systems and numerically show that the degree of improvement becomes large as the dimension of the system increases. Supported by JSPS Research Fellowships for Young Scientists H27-276 and JSPS Postdoctoral Fellowships for Research Abroad H25-32.

  12. 78 FR 36029 - CDFI Bond Guarantee Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ...The Community Development Financial Institutions (CDFI) Fund, a wholly owned government corporation within the U.S. Department of the Treasury, is seeking proposals from entities interested in serving as the Master Servicer/Trustee for the CDFI Bond Guarantee Program, which was authorized under the Small Business Jobs Act of 2010 (Pub. L. 111- 240; 12 U.S.C. 4713a) (the Act). This Notice of......

  13. Backfilling with guarantees granted upon job submission.

    SciTech Connect

    Leung, Vitus Joseph; Bunde, David P.; Lindsay, Alexander M.; Johnson, Christopher R.; Galloway-Carson, Maxwell

    2011-01-01

    In this paper, we present scheduling algorithms that simultaneously support guaranteed starting times and favor jobs with system desired traits. To achieve the first of these goals, our algorithms keep a profile with potential starting times for every unfinished job and never move these starting times later, just as in Conservative Backfilling. To achieve the second, they exploit previously unrecognized flexibility in the handling of holes opened in this profile when jobs finish early. We find that, with one choice of job selection function, our algorithms can consistently yield a lower average waiting time than Conservative Backfilling while still providing a guaranteed start time to each job as it arrives. In fact, in most cases, the algorithms give a lower average waiting time than the more aggressive EASY backfilling algorithm, which does not provide guaranteed start times. Alternately, with a different choice of job selection function, our algorithms can focus the benefit on the widest submitted jobs, the reason for the existence of parallel systems. In this case, these jobs experience significantly lower waiting time than Conservative Backfilling with minimal impact on other jobs.

  14. 7 CFR 4279.149 - Personal and corporate guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... guarantee form. When warranted by an Agency assessment of potential financial risk, Agency approved... percent interest in the borrower) and require security for any guarantee provided under this section....

  15. 48 CFR 846.302-70 - Guarantee clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT QUALITY ASSURANCE Contract Clauses 846.302-70 Guarantee clause. (a) The contracting officer shall... installation shall be borne by the Government. Where it is industry policy to guarantee components for the...

  16. 75 FR 63419 - Surety Bond Guarantee Program; Timber Sales

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ...The Small Business Administration (SBA) proposes to amend its Surety Bond Guarantee Program rules to guarantee performance bonds for timber sale contracts awarded by the Federal Government or other public or private...

  17. 76 FR 9962 - Surety Bond Guarantee Program; Timber Sales

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ...The Small Business Administration (SBA) is issuing this final rule to amend its Surety Bond Guarantee Program rules to guarantee bid and performance bonds for timber sale contracts awarded by the Federal Government or other public and private...

  18. 48 CFR 3052.217-100 - Guarantee (USCG).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (HSAR) 48 CFR 3017.9000(c), insert the following clause: Guarantee (USCG) (JUN 2006) (a) In the event... time of redelivery of the vessel(s), the guarantee period shall run from the date the item is...

  19. Guaranteed convergence of the Hough transform

    NASA Astrophysics Data System (ADS)

    Soffer, Menashe; Kiryati, Nahum

    1995-01-01

    The straight-line Hough Transform using normal parameterization with a continuous voting kernel is considered. It transforms the colinearity detection problem to a problem of finding the global maximum of a two dimensional function above a domain in the parameter space. The principle is similar to robust regression using fixed scale M-estimation. Unlike standard M-estimation procedures the Hough Transform does not rely on a good initial estimate of the line parameters: The global optimization problem is approached by exhaustive search on a grid that is usually as fine as computationally feasible. The global maximum of a general function above a bounded domain cannot be found by a finite number of function evaluations. Only if sufficient a-priori knowledge about the smoothness of the objective function is available, convergence to the global maximum can be guaranteed. The extraction of a-priori information and its efficient use are the main challenges in real global optimization problems. The global optimization problem in the Hough Transform is essentially how fine should the parameter space quantization be in order not to miss the true maximum. More than thirty years after Hough patented the basic algorithm, the problem is still essentially open. In this paper an attempt is made to identify a-priori information on the smoothness of the objective (Hough) function and to introduce sufficient conditions for the convergence of the Hough Transform to the global maximum. An image model with several application dependent parameters is defined. Edge point location errors as well as background noise are accounted for. Minimal parameter space quantization intervals that guarantee convergence are obtained. Focusing policies for multi-resolution Hough algorithms are developed. Theoretical support for bottom- up processing is provided. Due to the randomness of errors and noise, convergence guarantees are probabilistic.

  20. 7 CFR 1940.591 - Community Program Guaranteed loans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Community Program Guaranteed loans. 1940.591 Section... Loan and Grant Program Funds § 1940.591 Community Program Guaranteed loans. (a) Amount available for... transition formula for Community Program Guaranteed loans is not used. (e) Base allocation. See §...

  1. 7 CFR 1940.591 - Community Program Guaranteed loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Community Program Guaranteed loans. 1940.591 Section... Loan and Grant Program Funds § 1940.591 Community Program Guaranteed loans. (a) Amount available for... transition formula for Community Program Guaranteed loans is not used. (e) Base allocation. See §...

  2. 12 CFR 370.12 - Payment on the guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... transaction deposit accounts in such entities will be paid in accordance with 12 U.S.C. 1821(f) and 12 CFR... 12 Banks and Banking 5 2012-01-01 2012-01-01 false Payment on the guarantee. 370.12 Section 370.12... TEMPORARY LIQUIDITY GUARANTEE PROGRAM § 370.12 Payment on the guarantee. (a) Claims for Deposits...

  3. 13 CFR 120.400 - Loan Guarantee Agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Loan Guarantee Agreements. 120.400 Section 120.400 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Lenders § 120.400 Loan Guarantee Agreements. SBA may enter into a Loan Guarantee Agreement with a Lender to...

  4. 7 CFR 1717.1207 - RUS obligations under loan guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false RUS obligations under loan guarantees. 1717.1207... ELECTRIC LOANS Settlement of Debt § 1717.1207 RUS obligations under loan guarantees. Nothing in this subpart affects the obligations of RUS under loan guarantee commitments it has made to the...

  5. 13 CFR 120.348 - Amount of guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Amount of guarantee. 120.348 Section 120.348 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans International Trade Loans § 120.348 Amount of guarantee. SBA can guarantee up to...

  6. 14 CFR § 1300.14 - Guarantee percentage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Guarantee percentage. § 1300.14 Section § 1300.14 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET... § 1300.14 Guarantee percentage. A guarantee issued by the Board must be less than 100 percent of...

  7. 7 CFR 762.159 - Pledging of guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Pledging of guarantee. 762.159 Section 762.159 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS § 762.159 Pledging of guarantee. A lender may pledge all...

  8. 7 CFR 762.160 - Assignment of guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Assignment of guarantee. 762.160 Section 762.160 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS § 762.160 Assignment of guarantee. (a) The...

  9. 7 CFR 762.145 - Restructuring guaranteed loans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Restructuring guaranteed loans. 762.145 Section 762.145 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS § 762.145 Restructuring guaranteed loans....

  10. 12 CFR 370.3 - Debt Guarantee Program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... mandatory convertible debt), the maturity date of the debt, or December 31, 2012. (3) With respect to... 12 Banks and Banking 5 2013-01-01 2013-01-01 false Debt Guarantee Program. 370.3 Section 370.3... TEMPORARY LIQUIDITY GUARANTEE PROGRAM § 370.3 Debt Guarantee Program. (a) Upon the uncured failure of...

  11. 12 CFR 370.3 - Debt Guarantee Program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 5 2012-01-01 2012-01-01 false Debt Guarantee Program. 370.3 Section 370.3 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY TEMPORARY LIQUIDITY GUARANTEE PROGRAM § 370.3 Debt Guarantee Program. (a) Upon the uncured failure of a participating entity to make a timely payment...

  12. 12 CFR 370.3 - Debt Guarantee Program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... mandatory convertible debt), the maturity date of the debt, or December 31, 2012. (3) With respect to... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Debt Guarantee Program. 370.3 Section 370.3... TEMPORARY LIQUIDITY GUARANTEE PROGRAM § 370.3 Debt Guarantee Program. (a) Upon the uncured failure of...

  13. 12 CFR 370.3 - Debt Guarantee Program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... mandatory convertible debt), the maturity date of the debt, or December 31, 2012. (3) With respect to... 12 Banks and Banking 4 2011-01-01 2011-01-01 false Debt Guarantee Program. 370.3 Section 370.3... TEMPORARY LIQUIDITY GUARANTEE PROGRAM § 370.3 Debt Guarantee Program. (a) Upon the uncured failure of...

  14. 12 CFR 370.3 - Debt Guarantee Program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... mandatory convertible debt), the maturity date of the debt, or December 31, 2012. (3) With respect to... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Debt Guarantee Program. 370.3 Section 370.3... TEMPORARY LIQUIDITY GUARANTEE PROGRAM § 370.3 Debt Guarantee Program. (a) Upon the uncured failure of...

  15. 7 CFR 1493.40 - Application for payment guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the basis of CFR or CIF, the actual (if known at the time of application) or estimated value of... PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.40 Application for payment guarantee. (a) A firm export sale must...

  16. 7 CFR 2201.10 - Loan amount and Guarantee percentage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2201.10 Agriculture Regulations of the Department of Agriculture (Continued) LOCAL TELEVISION LOAN GUARANTEE BOARD LOCAL TELEVISION LOAN GUARANTEE PROGRAM-PROGRAM REGULATIONS Loan Guarantees § 2201.10 Loan..., enhancement, construction, deployment, launch, or rehabilitation of the means by which Local...

  17. 7 CFR 1493.40 - Application for payment guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., as agreed between the exporter and the importer. If the commodity was sold on the basis of CFR or CIF... CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations §...

  18. 7 CFR 1493.70 - Guarantee rates and fees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.70... length of the payment terms provided for in the export sale contract, the degree of risk that CCC...

  19. 7 CFR 1493.260 - Facility payment guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.260 Facility payment guarantee. (a) CCC's maximum obligation. CCC will agree to... fails to pay under the foreign bank letter of credit or related obligation. The exact amount of...

  20. 7 CFR 1493.40 - Application for payment guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., as agreed between the exporter and the importer. If the commodity was sold on the basis of CFR or CIF... CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations §...

  1. 7 CFR 1493.40 - Application for payment guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., as agreed between the exporter and the importer. If the commodity was sold on the basis of CFR or CIF... CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations §...

  2. 7 CFR 1493.70 - Guarantee rates and fees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.70... length of the payment terms provided for in the export sale contract, the degree of risk that CCC...

  3. 7 CFR 1493.260 - Facility payment guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.260 Facility payment guarantee. (a) CCC's maximum obligation. CCC will agree to... fails to pay under the foreign bank letter of credit or related obligation. The exact amount of...

  4. 7 CFR 1493.260 - Facility payment guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.260 Facility payment guarantee. (a) CCC's maximum obligation. CCC will agree to pay the exporter or the exporter's assignee an amount not to exceed...

  5. 7 CFR 1493.70 - Guarantee rates and fees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.70... length of the payment terms provided for in the export sale contract, the degree of risk that CCC...

  6. 29 CFR 4022.62 - Estimated guaranteed benefit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Estimated guaranteed benefit. 4022.62 Section 4022.62 Labor... PAYABLE IN TERMINATED SINGLE-EMPLOYER PLANS Benefit Reductions in Terminating Plans § 4022.62 Estimated guaranteed benefit. (a) General. The estimated guaranteed benefit payable with respect to each...

  7. 12 CFR 370.12 - Payment on the guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Payment on the guarantee. 370.12 Section 370.12... transaction deposit accounts in such entities will be paid in accordance with 12 U.S.C. 1821(f) and 12 CFR... TEMPORARY LIQUIDITY GUARANTEE PROGRAM § 370.12 Payment on the guarantee. (a) Claims for......

  8. 7 CFR 762.145 - Restructuring guaranteed loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Restructuring guaranteed loans. 762.145 Section 762.145 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS § 762.145 Restructuring guaranteed loans....

  9. 7 CFR 1493.40 - Application for payment guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the basis of CFR or CIF, the actual (if known at the time of application) or estimated value of... PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.40 Application for payment guarantee. (a) A firm export sale must...

  10. 24 CFR 573.10 - Fees for guaranteed loans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Fees for guaranteed loans. 573.10 Section 573.10 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT COMMUNITY FACILITIES LOAN GUARANTEE RECOVERY FUND § 573.10 Fees for guaranteed...

  11. 7 CFR 4279.149 - Personal and corporate guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Personal and corporate guarantee. 4279.149 Section... Industry Loans § 4279.149 Personal and corporate guarantee. (a) Unconditional personal and corporate... adequately secured for loanmaking purposes. Agency approved personal and corporate guarantees for the...

  12. Guaranteeing safety in spatially situated agents

    SciTech Connect

    Kohout, R.C.; Hendler, J.A.; Musliner, D.J.

    1996-12-31

    {open_quote}Mission-critical{close_quotes} systems, which include such diverse applications as nuclear power plant controllers, {open_quotes}fly-by-wire{close_quotes} airplanes, medical care and monitoring systems, and autonomous mobile vehicles, are characterized by the fact that system failure is potentially catastrophic. The high cost of failure justifies the expenditure of considerable effort at design-time in order to guarantee the correctness of system behavior. This paper examines the problem of guaranteeing safety in a well studied class of robot motion problems known as the {open_quotes}asteroid avoidance problem.{close_quotes} We establish necessary and sufficient conditions for ensuring safety in the simple version of this problem which occurs most frequently in the literature, as well as sufficient conditions for a more general and realistic case. In doing so, we establish functional relationships between the number, size and speed of obstacles, the robot`s maximum speed and the conditions which must be maintained in order to ensure safety.

  13. 78 FR 79253 - CCC Export Credit Guarantee (GSM-102) Program and Facility Guarantee Program (FGP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ...This proposed rule would revise and amend the regulations that administer the Export Credit Guarantee (GSM-102) Program. Changes in this proposed rule incorporate program operational changes and information from press releases and notices to participants that have been implemented since the publication of the current rule, and include other administrative revisions to enhance clarity and......

  14. 78 FR 36018 - Bond Guarantee Program; Notice of Guarantee Availability (NOGA) Inviting Qualified Issuer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... interim rule that governs the CDFI Bond Guarantee Program was published on February 5, 2013 (78 FR 8296... Fund program, the CDFI Fund will review those entities (or their Affiliates) that have a history of providing late reports and consider such history in the context of organizational capacity and the...

  15. Rapid Sampling for Visualizations with Ordering Guarantees

    PubMed Central

    Kim, Albert; Blais, Eric; Parameswaran, Aditya; Indyk, Piotr; Madden, Sam; Rubinfeld, Ronitt

    2015-01-01

    Visualizations are frequently used as a means to understand trends and gather insights from datasets, but often take a long time to generate. In this paper, we focus on the problem of rapidly generating approximate visualizations while preserving crucial visual properties of interest to analysts. Our primary focus will be on sampling algorithms that preserve the visual property of ordering; our techniques will also apply to some other visual properties. For instance, our algorithms can be used to generate an approximate visualization of a bar chart very rapidly, where the comparisons between any two bars are correct. We formally show that our sampling algorithms are generally applicable and provably optimal in theory, in that they do not take more samples than necessary to generate the visualizations with ordering guarantees. They also work well in practice, correctly ordering output groups while taking orders of magnitude fewer samples and much less time than conventional sampling schemes. PMID:26779380

  16. Linear control design for guaranteed stability of uncertain linear systems

    NASA Technical Reports Server (NTRS)

    Yedavalli, R. K.

    1986-01-01

    In this paper, a linear control design algorithm based on the elemental perturbation bounds developed recently is presented for a simple second order linear uncertain system satisfying matching conditions. The proposed method is compared with Guaranteed Cost Control (GCC), Multistep Guaranteed Cost Control (MGCC) and the Matching Condition (MC) methods and is shown to give guaranteed stability with lesser values for the control gains than some of the existing methods for the example considered.

  17. 7 CFR 1980.420 - Loan guarantee limits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.420 Loan guarantee... factors involved, including but not limited to: (1) Borrower's management. The borrower's management,...

  18. WDM backbone network with guaranteed performance planning

    NASA Astrophysics Data System (ADS)

    Liang, Peng; Sheng, Wang; Zhong, Xusi; Li, Lemin

    2005-11-01

    Wavelength-Division multiplexing (WDM), which allows a single fibre to carry multiple signals simultaneously, has been widely used to increase link capacity and is a promising technology in backbone transport network. But designing such WDM backbone network is hard for two reasons, one is the uncertainty of future traffic demand, the other is difficulty of planning of the backup resource for failure conditions. As a result, enormous amount of link capacity for the network has to be provided for the network. Recently, a new approach called Valiant Load-Balanced Scheme (VLBS) has been proposed to design the WDM backbone network. The network planned by Valiant Load-Balanced Scheme is insensitive to the traffic and continues to guarantee performance under a user defined number of link or node failures. In this paper, the Valiant Load-Balanced Scheme (VLBS) for backbone network planning has been studied and a new Valiant Load-Balanced Scheme has been proposed. Compared with the early work, the new Valiant Load-Balanced Scheme is much more general and can be used for the computation of the link capacity of both homogeneous and heterogeneous networks. The abbreviation for the general Valiant Load-Balanced Scheme is GVLBS. After a brief description of the VLBS, we will give the detail derivation of the GVLBS. The central concept of the derivation of GVLBS is transforming the heterogeneous network into a homogeneous network, and taking advantage of VLBS to get GVLBS. Such transformation process is described and the derivation and analysis of GVLBS for link capacity under normal and failure conditions is also given. The numerical results show that GVLBS can compute the minimum link capacity required for the heterogeneous backbone network under different conditions (normal or failure).

  19. 7 CFR 4279.149 - Personal and corporate guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Personal and corporate guarantee. 4279.149 Section 4279.149 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business...

  20. 7 CFR 4279.119 - Loan guarantee limits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Loan guarantee limits. 4279.119 Section 4279.119 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry...

  1. 7 CFR 4279.119 - Loan guarantee limits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Loan guarantee limits. 4279.119 Section 4279.119 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry...

  2. 7 CFR 4279.186 - Issuance of the guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Issuance of the guarantee. 4279.186 Section 4279.186 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry...

  3. 7 CFR 4279.186 - Issuance of the guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Issuance of the guarantee. 4279.186 Section 4279.186 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry...

  4. 7 CFR 4279.186 - Issuance of the guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Issuance of the guarantee. 4279.186 Section 4279.186 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry...

  5. 7 CFR 4279.149 - Personal and corporate guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Personal and corporate guarantee. 4279.149 Section 4279.149 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business...

  6. 7 CFR 4279.186 - Issuance of the guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Issuance of the guarantee. 4279.186 Section 4279.186 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry...

  7. 7 CFR 4279.119 - Loan guarantee limits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Loan guarantee limits. 4279.119 Section 4279.119 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry...

  8. 7 CFR 4279.149 - Personal and corporate guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Personal and corporate guarantee. 4279.149 Section 4279.149 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business...

  9. 7 CFR 4279.119 - Loan guarantee limits.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Loan guarantee limits. 4279.119 Section 4279.119 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business and Industry...

  10. 7 CFR 1980.488 - Guaranteed industrial development bond issues.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 14 2011-01-01 2011-01-01 false Guaranteed industrial development bond issues. 1980..., DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.488 Guaranteed industrial development bond issues. (a) Loans to public bodies will...

  11. 7 CFR 1980.488 - Guaranteed industrial development bond issues.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 14 2013-01-01 2013-01-01 false Guaranteed industrial development bond issues. 1980..., DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.488 Guaranteed industrial development bond issues. (a) Loans to public bodies will...

  12. 7 CFR 1980.488 - Guaranteed industrial development bond issues.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 14 2012-01-01 2012-01-01 false Guaranteed industrial development bond issues. 1980..., DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.488 Guaranteed industrial development bond issues. (a) Loans to public bodies will...

  13. 7 CFR 1980.488 - Guaranteed industrial development bond issues.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 14 2014-01-01 2014-01-01 false Guaranteed industrial development bond issues. 1980..., DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.488 Guaranteed industrial development bond issues. (a) Loans to public bodies will...

  14. 7 CFR 1980.488 - Guaranteed industrial development bond issues.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Guaranteed industrial development bond issues. 1980..., DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.488 Guaranteed industrial development bond issues. (a) Loans to public bodies will...

  15. 13 CFR 120.613 - Secondary Participation Guarantee Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Secondary Participation Guarantee Agreement. 120.613 Section 120.613 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Secondary Market Certificates § 120.613 Secondary Participation Guarantee Agreement. When a...

  16. 7 CFR 4280.124 - Guaranteed loan funding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... General Renewable Energy System and Energy Efficiency Improvement Guaranteed Loans § 4280.124 Guaranteed... section, as long as the items are an integral and necessary part of the renewable energy system or energy... consideration the following six criteria: (1) The type of renewable energy system to be purchased; (2)...

  17. 7 CFR 4280.124 - Guaranteed loan funding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... General Renewable Energy System and Energy Efficiency Improvement Guaranteed Loans § 4280.124 Guaranteed... section, as long as the items are an integral and necessary part of the renewable energy system or energy... consideration the following six criteria: (1) The type of renewable energy system to be purchased; (2)...

  18. 42 CFR 57.1507 - Limitations applicable to loan guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Limitations applicable to loan guarantee. 57.1507 Section 57.1507 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR CONSTRUCTION OF TEACHING FACILITIES, EDUCATIONAL IMPROVEMENTS, SCHOLARSHIPS AND STUDENT LOANS Loan Guarantees and Interest Subsidies...

  19. 22 CFR 230.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Transferability of Guarantee; Note Register. 230.06 Section 230.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD...

  20. 22 CFR 230.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Transferability of Guarantee; Note Register. 230.06 Section 230.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD...

  1. 22 CFR 230.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Transferability of Guarantee; Note Register. 230.06 Section 230.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD...

  2. 22 CFR 230.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Transferability of Guarantee; Note Register. 230.06 Section 230.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD...

  3. 22 CFR 230.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Transferability of Guarantee; Note Register. 230.06 Section 230.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD...

  4. 7 CFR 1940.560 - Guarantee Rural Rental Housing Program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Allocation of Loan and Grant Program Funds § 1940.560 Guarantee Rural Rental Housing Program. When funding... 7 Agriculture 13 2010-01-01 2009-01-01 true Guarantee Rural Rental Housing Program. 1940.560 Section 1940.560 Agriculture Regulations of the Department of Agriculture (Continued) RURAL...

  5. 7 CFR 1940.560 - Guarantee Rural Rental Housing Program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Allocation of Loan and Grant Program Funds § 1940.560 Guarantee Rural Rental Housing Program. When funding... 7 Agriculture 13 2012-01-01 2012-01-01 false Guarantee Rural Rental Housing Program. 1940.560 Section 1940.560 Agriculture Regulations of the Department of Agriculture (Continued) RURAL...

  6. 7 CFR 1940.560 - Guarantee Rural Rental Housing Program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Allocation of Loan and Grant Program Funds § 1940.560 Guarantee Rural Rental Housing Program. When funding... 7 Agriculture 13 2014-01-01 2013-01-01 true Guarantee Rural Rental Housing Program. 1940.560 Section 1940.560 Agriculture Regulations of the Department of Agriculture (Continued) RURAL...

  7. 7 CFR 1940.560 - Guarantee Rural Rental Housing Program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Allocation of Loan and Grant Program Funds § 1940.560 Guarantee Rural Rental Housing Program. When funding... 7 Agriculture 13 2011-01-01 2009-01-01 true Guarantee Rural Rental Housing Program. 1940.560 Section 1940.560 Agriculture Regulations of the Department of Agriculture (Continued) RURAL...

  8. 22 CFR 233.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Transferability of Guarantee; Note Register. 233.06 Section 233.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT HASHEMITE KINGDOM OF JORDAN LOAN GUARANTEES ISSUED UNDER THE FURTHER CONTINUING APPROPRIATIONS ACT, 2013, DIV. F, PUB. L....

  9. 14 CFR 1300.18 - Issuance of the guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Issuance of the guarantee. 1300.18 Section 1300.18 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and Application...

  10. 14 CFR 1300.18 - Issuance of the guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Issuance of the guarantee. 1300.18 Section 1300.18 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and Application...

  11. 14 CFR 1300.23 - Participation in guaranteed loans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Participation in guaranteed loans. 1300.23 Section 1300.23 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and...

  12. 14 CFR 1300.23 - Participation in guaranteed loans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Participation in guaranteed loans. 1300.23 Section 1300.23 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and...

  13. 77 FR 58991 - State-Level Guarantee Fee Pricing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... AGENCY State-Level Guarantee Fee Pricing AGENCY: Federal Housing Finance Agency. ACTION: Notice; input... guarantee fees (``g-fees'') that the Enterprises charge for mortgages that finance properties with one to... Enterprises charge g-fees to compensate for the credit risks they undertake when they own or...

  14. 48 CFR 846.302-70 - Guarantee clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Guarantee clause. 846.302-70 Section 846.302-70 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 846.302-70 Guarantee clause. (a) The contracting officer shall insert the clause at...

  15. 78 FR 18376 - Promotional Rates for Global Express Guaranteed Service

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... From the Federal Register Online via the Government Publishing Office POSTAL SERVICE Promotional Rates for Global Express Guaranteed Service AGENCY: Postal Service\\TM\\. ACTION: Notice of Promotional Rates. SUMMARY: The Postal Service gives notice of promotional rates for Global Express Guaranteed...

  16. 77 FR 65899 - Agency Information Collection Activities: Guarantee of Payment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... SECURITY U.S. Customs and Border Protection Agency Information Collection Activities: Guarantee of Payment... Guarantee of Payment (CBP Form I-510). This request for comment is being made pursuant to the Paperwork... Payment. OMB Number: 1651-00127. Form Number: Form I-510. Abstract: Section 253 of the Immigration...

  17. 24 CFR 1007.50 - Certificate of guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... DEVELOPMENT SECTION 184A LOAN GUARANTEES FOR NATIVE HAWAIIAN HOUSING § 1007.50 Certificate of guarantee. (a... shall submit the application for the loan to HUD for examination. (2) Approval. If HUD approves the application submitted under paragraph (a)(1) of this section, HUD will issue a certificate as evidence of...

  18. 48 CFR 52.247-60 - Guaranteed Shipping Characteristics.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Guaranteed Shipping Characteristics. 52.247-60 Section 52.247-60 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52.247-60 Guaranteed...

  19. 7 CFR 1493.440 - Certification requirements for payment guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee Program Operations § 1493.440 Certification requirements for payment... notify CCC if there is a change of circumstances which would cause it to fail to meet such...

  20. 7 CFR 1493.440 - Certification requirements for payment guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee Program Operations § 1493.440 Certification..., and the exporter will immediately notify CCC if there is a change of circumstances which would...

  1. 7 CFR 1493.440 - Certification requirements for payment guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee Program Operations § 1493.440 Certification..., and the exporter will immediately notify CCC if there is a change of circumstances which would...

  2. 7 CFR 1493.440 - Certification requirements for payment guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee Program Operations § 1493.440 Certification requirements for payment... notify CCC if there is a change of circumstances which would cause it to fail to meet such...

  3. 7 CFR 1493.440 - Certification requirements for payment guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier Credit Guarantee Program Operations § 1493.440 Certification requirements for payment... notify CCC if there is a change of circumstances which would cause it to fail to meet such...

  4. 75 FR 25833 - Information Collection; Guaranteed Loan Making and Servicing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... contacting Trent Rogers at the above address. FOR FURTHER INFORMATION CONTACT: Trent Rogers, Senior Loan... Farm Service Agency Information Collection; Guaranteed Loan Making and Servicing AGENCY: Farm Service... the Guaranteed Farm Loan Program. DATES: We will consider comments that we receive by July 9,...

  5. 22 CFR 232.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Transferability of Guarantee; Note Register. 232.06 Section 232.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REPUBLIC OF TUNISIA LOAN GUARANTEES ISSUED UNDER THE DEPARTMENT OF STATE, FOREIGN OPERATIONS, AND RELATED PROGRAMS APPROPRIATIONS...

  6. 22 CFR 232.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Transferability of Guarantee; Note Register. 232.06 Section 232.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REPUBLIC OF TUNISIA LOAN GUARANTEES ISSUED UNDER THE DEPARTMENT OF STATE, FOREIGN OPERATIONS, AND RELATED PROGRAMS APPROPRIATIONS...

  7. 7 CFR 1720.8 - Issuance of the guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... applicant shall provide evidence of an investment grade rating from a Rating Agency for the proposed guaranteed bond without regard to the guarantee; (8) The applicant shall provide evidence of a credit rating on its senior secured debt or its corporate credit rating, as applicable, without regard to...

  8. 7 CFR 1720.8 - Issuance of the guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... applicant shall provide evidence of an investment grade rating from a Rating Agency for the proposed guaranteed bond without regard to the guarantee; (8) The applicant shall provide evidence of a credit rating on its senior secured debt or its corporate credit rating, as applicable, without regard to...

  9. 7 CFR 1720.8 - Issuance of the guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... applicant shall provide evidence of an investment grade rating from a Rating Agency for the proposed guaranteed bond without regard to the guarantee; (8) The applicant shall provide evidence of a credit rating on its senior secured debt or its corporate credit rating, as applicable, without regard to...

  10. 7 CFR 1720.8 - Issuance of the guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... applicant shall provide evidence of an investment grade rating from a Rating Agency for the proposed guaranteed bond without regard to the guarantee; (8) The applicant shall provide evidence of a credit rating on its senior secured debt or its corporate credit rating, as applicable, without regard to...

  11. 7 CFR 1720.8 - Issuance of the guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... applicant shall provide evidence of an investment grade rating from a Rating Agency for the proposed guaranteed bond without regard to the guarantee; (8) The applicant shall provide evidence of a credit rating..., an annual credit assessment of the applicant by a Rating Agency, an annual review and...

  12. 10 CFR 609.10 - Loan Guarantee Agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Loan Guarantee Agreement. 609.10 Section 609.10 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS THAT EMPLOY INNOVATIVE... projected useful life of the project's major physical assets, as calculated in accordance with...

  13. 22 CFR 231.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Transferability of Guarantee; Note Register. 231.06 Section 231.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC...

  14. 22 CFR 231.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Transferability of Guarantee; Note Register. 231.06 Section 231.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC...

  15. 22 CFR 231.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Transferability of Guarantee; Note Register. 231.06 Section 231.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC...

  16. 22 CFR 231.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Transferability of Guarantee; Note Register. 231.06 Section 231.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC...

  17. 22 CFR 231.06 - Transferability of Guarantee; Note Register.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Transferability of Guarantee; Note Register. 231.06 Section 231.06 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC...

  18. 14 CFR 1300.23 - Participation in guaranteed loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Participation in guaranteed loans. 1300.23 Section 1300.23 Aeronautics and Space AIR TRANSPORTATION SYSTEM STABILIZATION OFFICE OF MANAGEMENT AND BUDGET AVIATION DISASTER RELIEF-AIR CARRIER GUARANTEE LOAN PROGRAM Minimum Requirements and Application Procedures § 1300.23 Participation...

  19. 29 CFR 541.604 - Minimum guarantee plus extras.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Minimum guarantee plus extras. 541.604 Section 541.604 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS... SALES EMPLOYEES Salary Requirements § 541.604 Minimum guarantee plus extras. (a) An employer may...

  20. 29 CFR 541.604 - Minimum guarantee plus extras.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 3 2013-07-01 2013-07-01 false Minimum guarantee plus extras. 541.604 Section 541.604 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS... SALES EMPLOYEES Salary Requirements § 541.604 Minimum guarantee plus extras. (a) An employer may...

  1. 29 CFR 541.604 - Minimum guarantee plus extras.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 3 2012-07-01 2012-07-01 false Minimum guarantee plus extras. 541.604 Section 541.604 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS... SALES EMPLOYEES Salary Requirements § 541.604 Minimum guarantee plus extras. (a) An employer may...

  2. 29 CFR 541.604 - Minimum guarantee plus extras.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 3 2014-07-01 2014-07-01 false Minimum guarantee plus extras. 541.604 Section 541.604 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS... SALES EMPLOYEES Salary Requirements § 541.604 Minimum guarantee plus extras. (a) An employer may...

  3. 29 CFR 541.604 - Minimum guarantee plus extras.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 3 2011-07-01 2011-07-01 false Minimum guarantee plus extras. 541.604 Section 541.604 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS... SALES EMPLOYEES Salary Requirements § 541.604 Minimum guarantee plus extras. (a) An employer may...

  4. 34 CFR 682.503 - The guarantee agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false The guarantee agreement. 682.503 Section 682.503 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Federal Guaranteed Student Loan Programs § 682.503 The...

  5. Children and Poverty in South Africa: The Right to Social Security

    ERIC Educational Resources Information Center

    Du Plessis, Pierre; Conley, Lloyd

    2007-01-01

    Poverty is one of the major threats to the realization of children's rights worldwide and in South Africa. Currently, 66% of South African children live in severe poverty. This places all other rights at risk; the rights guaranteed by the South African Constitution and by the UN Convention. Poverty and inequality in South Africa continue to…

  6. 13 CFR 120.524 - When is SBA released from liability on its guarantee?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... liability on its guarantee? 120.524 Section 120.524 Business Credit and Assistance SMALL BUSINESS... Purchase of A Guaranteed Portion § 120.524 When is SBA released from liability on its guarantee? (a) SBA is... from its guarantee only if the Lender fails to request that SBA purchase the guarantee within 180...

  7. 13 CFR 120.524 - When is SBA released from liability on its guarantee?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... liability on its guarantee? 120.524 Section 120.524 Business Credit and Assistance SMALL BUSINESS... Purchase of A Guaranteed Portion § 120.524 When is SBA released from liability on its guarantee? (a) SBA is... from its guarantee only if the Lender fails to request that SBA purchase the guarantee within 180...

  8. 13 CFR 120.524 - When is SBA released from liability on its guarantee?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... liability on its guarantee? 120.524 Section 120.524 Business Credit and Assistance SMALL BUSINESS... Purchase of A Guaranteed Portion § 120.524 When is SBA released from liability on its guarantee? (a) SBA is... from its guarantee only if the Lender fails to request that SBA purchase the guarantee within 180...

  9. [Waiting lists guarantee in health care. Some theoretical reflections].

    PubMed

    Piene, H; Hauge, H K; Nyen, P A

    1997-01-30

    In 1990 a "waiting list guarantee" was introduced in the Norwegian health care system to secure treatment within six months for patients belonging to priority group II. (Priority group II are patients in need of treatment to avoid health hazards or serious long-term effects.) This guarantee has been difficult to honour and has caused considerable political unrest in the recent years. In an attempt to reform the guarantee, an analysis of our hospitals' capacity problems has been carried out, based on the general theory of queues. One result was that in order to fulfill the guarantee it is necessary to drastically reduce the queues and increase the capacity to deliver health services. This article presents the reasoning behind the analysis, in order to demonstrate the necessary foundation for a health policy that aims to reduce the time Norwegian patients have to wait for treatment in hospital. PMID:9064860

  10. Economic model for QoS guarantee on the Internet

    NASA Astrophysics Data System (ADS)

    Zhang, Chi; Wei, Jiaolong

    2001-09-01

    This paper describes a QoS guarantee architecture suited for best-effort environments, based on ideas from microeconomics and non-cooperative game theory. First, an analytic model is developed for the study of the resource allocation in the Internet. Then we show that with a simple pricing mechanism (from network implementation and users' points-of-view), we were able to provide QoS guarantee at per flow level without resource allocation or complicated scheduling mechanisms or maintaining per flow state in the core network. Unlike the previous work on this area, we extend the basic model to support inelastic applications which require minimum bandwidth guarantees for a given time period by introducing derivative market.

  11. Abstraction and Assume-Guarantee Reasoning for Automated Software Verification

    NASA Technical Reports Server (NTRS)

    Chaki, S.; Clarke, E.; Giannakopoulou, D.; Pasareanu, C. S.

    2004-01-01

    Compositional verification and abstraction are the key techniques to address the state explosion problem associated with model checking of concurrent software. A promising compositional approach is to prove properties of a system by checking properties of its components in an assume-guarantee style. This article proposes a framework for performing abstraction and assume-guarantee reasoning of concurrent C code in an incremental and fully automated fashion. The framework uses predicate abstraction to extract and refine finite state models of software and it uses an automata learning algorithm to incrementally construct assumptions for the compositional verification of the abstract models. The framework can be instantiated with different assume-guarantee rules. We have implemented our approach in the COMFORT reasoning framework and we show how COMFORT out-performs several previous software model checking approaches when checking safety properties of non-trivial concurrent programs.

  12. Assume-Guarantee Abstraction Refinement Meets Hybrid Systems

    NASA Technical Reports Server (NTRS)

    Bogomolov, Sergiy; Frehse, Goran; Greitschus, Marius; Grosu, Radu; Pasareanu, Corina S.; Podelski, Andreas; Strump, Thomas

    2014-01-01

    Compositional verification techniques in the assume- guarantee style have been successfully applied to transition systems to efficiently reduce the search space by leveraging the compositional nature of the systems under consideration. We adapt these techniques to the domain of hybrid systems with affine dynamics. To build assumptions we introduce an abstraction based on location merging. We integrate the assume-guarantee style analysis with automatic abstraction refinement. We have implemented our approach in the symbolic hybrid model checker SpaceEx. The evaluation shows its practical potential. To the best of our knowledge, this is the first work combining assume-guarantee reasoning with automatic abstraction-refinement in the context of hybrid automata.

  13. Robust levitation control for maglev systems with guaranteed bounded airgap.

    PubMed

    Xu, Jinquan; Chen, Ye-Hwa; Guo, Hong

    2015-11-01

    The robust control design problem for the levitation control of a nonlinear uncertain maglev system is considered. The uncertainty is (possibly) fast time-varying. The system has magnitude limitation on the airgap between the suspended chassis and the guideway in order to prevent undesirable contact. Furthermore, the (global) matching condition is not satisfied. After a three-step state transformation, a robust control scheme for the maglev vehicle is proposed, which is able to guarantee the uniform boundedness and uniform ultimate boundedness of the system, regardless of the uncertainty. The magnitude limitation of the airgap is guaranteed, regardless of the uncertainty. PMID:26524957

  14. Guaranteed robustness properties of multivariable nonlinear stochastic optimal regulators

    NASA Technical Reports Server (NTRS)

    Tsitsiklis, J. N.; Athans, M.

    1984-01-01

    The robustness of optimal regulators for nonlinear, deterministic and stochastic, multi-input dynamical systems is studied under the assumption that all state variables can be measured. It is shown that, under mild assumptions, such nonlinear regulators have a guaranteed infinite gain margin; moreover, they have a guaranteed 50 percent gain reduction margin and a 60 degree phase margin, in each feedback channel, provided that the system is linear in the control and the penalty to the control is quadratic, thus extending the well-known properties of LQ regulators to nonlinear optimal designs. These results are also valid for infinite horizon, average cost, stochastic optimal control problems.

  15. Guaranteed robustness properties of multivariable, nonlinear, stochastic optimal regulators

    NASA Technical Reports Server (NTRS)

    Tsitsiklis, J. N.; Athans, M.

    1983-01-01

    The robustness of optimal regulators for nonlinear, deterministic and stochastic, multi-input dynamical systems is studied under the assumption that all state variables can be measured. It is shown that, under mild assumptions, such nonlinear regulators have a guaranteed infinite gain margin; moreover, they have a guaranteed 50 percent gain reduction margin and a 60 degree phase margin, in each feedback channel, provided that the system is linear in the control and the penalty to the control is quadratic, thus extending the well-known properties of LQ regulators to nonlinear optimal designs. These results are also valid for infinite horizon, average cost, stochastic optimal control problems.

  16. Calculation of guaranteed mean power from wind turbine generators

    NASA Technical Reports Server (NTRS)

    Spera, D. A.

    1981-01-01

    A method for calculating the 'guaranteed mean' power output of a wind turbine generator is proposed. The term 'mean power' refers to the average power generated at specified wind speeds during short-term tests. Correlation of anemometers, the method of bins for analyzing non-steady data, the PROP Code for predicting turbine power, and statistical analysis of deviations in test data from theory are discussed. Guaranteed mean power density for the Clayton Mod-OA system was found to be 8 watts per square meter less than theoretical power density at all power levels, with a confidence level of 0.999. This amounts to 4 percent of rated power.

  17. 22 CFR 221.13 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Non-impairment of the Guarantee. 221.13 Section 221.13 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.13 Non-impairment of the Guarantee. The full faith and credit of the...

  18. 22 CFR 221.13 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Non-impairment of the Guarantee. 221.13 Section 221.13 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.13 Non-impairment of the Guarantee. The full faith and credit of the...

  19. 22 CFR 221.13 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Non-impairment of the Guarantee. 221.13 Section 221.13 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.13 Non-impairment of the Guarantee. The full faith and credit of the...

  20. 22 CFR 221.13 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Non-impairment of the Guarantee. 221.13 Section 221.13 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.13 Non-impairment of the Guarantee. The full faith and credit of the...

  1. 22 CFR 221.13 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Non-impairment of the Guarantee. 221.13 Section 221.13 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEE STANDARD TERMS AND CONDITIONS The Guarantee § 221.13 Non-impairment of the Guarantee. The full faith and credit of the...

  2. 7 CFR 4287.180 - Termination of guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Termination of guarantee. 4287.180 Section 4287.180 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE SERVICING Servicing Business and Industry...

  3. 7 CFR 4287.180 - Termination of guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Termination of guarantee. 4287.180 Section 4287.180 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE SERVICING Servicing Business and Industry...

  4. 7 CFR 4287.180 - Termination of guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Termination of guarantee. 4287.180 Section 4287.180 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE SERVICING Servicing Business and Industry...

  5. 7 CFR 4287.180 - Termination of guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Termination of guarantee. 4287.180 Section 4287.180 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE SERVICING Servicing Business and Industry...

  6. Real promise or false hope: DOE's title XVII loan Guarantee

    SciTech Connect

    Massouh, Jennifer F.; Cannon, George D. Jr.; Logan, Suzanne M.; Schwartz, David L.

    2009-05-15

    While the American Recovery and Reinvestment Act of 2009 expanded the DOE loan guarantee program to include certain ''shovel-ready'' projects, and appropriated $6 billion to cover the credit subsidy cost associated with these projects, it failed to resolve some of the most pressing problems facing the program. Here are some recommendations that may finally get some shovels in the ground. (author)

  7. 29 CFR 4022.23 - Computation of maximum guaranteeable benefits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in any manner other than as a monthly benefit payable for life commencing at age 65, the maximum... of a step-down life annuity, the maximum guaranteeable monthly amount of such benefit shall be... 120 month period. (d) Factor for benefit payable in a form other than as a life annuity. When...

  8. 7 CFR 1940.560 - Guarantee Rural Rental Housing Program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Guarantee Rural Rental Housing Program. 1940.560 Section 1940.560 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS...

  9. 13 CFR 108.1720 - Characteristics of SBA's guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Characteristics of SBA's guarantee. 108.1720 Section 108.1720 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM SBA Financial Assistance for NMVC Companies (Leverage)...

  10. 14 CFR § 1214.811 - Reflight guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Reflight guarantee. § 1214.811 Section § 1214.811 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Reimbursement... accommodated on a standard Shuttle launch to 160 nmi, 28.5° as defined in the Shuttle policy and all...

  11. 7 CFR 4280.129 - Evaluation of guaranteed loan applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... merit will be based on the information provided by the applicant. The Agency may engage the services of... 7 Agriculture 15 2010-01-01 2010-01-01 false Evaluation of guaranteed loan applications. 4280.129 Section 4280.129 Agriculture Regulations of the Department of Agriculture (Continued) RURAL...

  12. Improvements Needed in Administration of the Guaranteed Student Loan Program.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    This report identifies improvements needed in administration of the guaranteed student loan program. Improvements needed are based on the fact that that lenders are not informed when student borrowers drop out of school. Alternatives for providing lenders with timely information on enrollment terminations are indicated. Additional administrative…

  13. 7 CFR 1493.430 - Application for a payment guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... commodity was sold on the basis of CFR or CIF, the actual (if known at the time of application) or estimated... CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier... quantity, contract loading tolerance and, if the exporter chooses, a request for CCC to reserve coverage...

  14. 7 CFR 1493.430 - Application for a payment guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... commodity was sold on the basis of CFR or CIF, the actual (if known at the time of application) or estimated... CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier... quantity, contract loading tolerance and, if the exporter chooses, a request for CCC to reserve coverage...

  15. 7 CFR 1493.430 - Application for a payment guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... commodity was sold on the basis of CFR or CIF, the actual (if known at the time of application) or estimated... CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Supplier... quantity, contract loading tolerance and, if the exporter chooses, a request for CCC to reserve coverage...

  16. 78 FR 1220 - Agency Information Collection Activities: Guarantee of Payment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... (77 FR 65899) on October 31, 2012, allowing for a 60-day comment period. This notice allows for an... SECURITY U.S. Customs and Border Protection Agency Information Collection Activities: Guarantee of Payment AGENCY: U.S. Customs and Border Protection, Department of Homeland Security. ACTION: 30-Day notice...

  17. 78 FR 48135 - Information Collection; Guaranteed Farm Loan Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... online instructions for submitting comments. Mail: Trent Rogers, Senior Loan Specialist, USDA, FSA, Stop... above addresses. FOR FURTHER INFORMATION CONTACT: Trent Rogers, Senior Loan Specialist, (202) 720-3889...; ] DEPARTMENT OF AGRICULTURE Farm Service Agency Information Collection; Guaranteed Farm Loan Program...

  18. 76 FR 57940 - CCC Export Credit Guarantee (GSM-102) Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ...The Commodity Credit Corporation (CCC) published a proposed rule on July 27, 2011 (76 FR 44836-44855), revising and amending the regulations that administer the Export Credit Guarantee (GSM-102) Program. Changes in this proposed rule incorporate program operational changes and information from press releases and notices to participants that have been implemented since the publication of the......

  19. 40 CFR 280.106 - Local government guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... exceeds [select one: the local government bond rating test requirements of 40 CFR part 280.104, the local government financial test requirements of 40 part CFR 280.105, the local government fund under 40 CFR part... guarantee satisfies 40 CFR part 280, subpart H requirements for assuring funding for arising from...

  20. 40 CFR 280.106 - Local government guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... exceeds [select one: the local government bond rating test requirements of 40 CFR part 280.104, the local government financial test requirements of 40 part CFR 280.105, the local government fund under 40 CFR part... guarantee satisfies 40 CFR part 280, subpart H requirements for assuring funding for arising from...

  1. 40 CFR 280.106 - Local government guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... exceeds [select one: the local government bond rating test requirements of 40 CFR part 280.104, the local government financial test requirements of 40 part CFR 280.105, the local government fund under 40 CFR part... guarantee satisfies 40 CFR part 280, subpart H requirements for assuring funding for arising from...

  2. 40 CFR 280.106 - Local government guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... exceeds [select one: the local government bond rating test requirements of 40 CFR part 280.104, the local government financial test requirements of 40 part CFR 280.105, the local government fund under 40 CFR part... guarantee satisfies 40 CFR part 280, subpart H requirements for assuring funding for arising from...

  3. 40 CFR 280.106 - Local government guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... exceeds [select one: the local government bond rating test requirements of 40 CFR part 280.104, the local government financial test requirements of 40 part CFR 280.105, the local government fund under 40 CFR part... guarantee satisfies 40 CFR part 280, subpart H requirements for assuring funding for arising from...

  4. A Guaranteed Scheduling Technique to Manage Students' Procrastination.

    ERIC Educational Resources Information Center

    Ottens, Allan J.

    1982-01-01

    Describes some clinical observations of procrastinating and procrastinators and addresses how these observations have led to the development of a guaranteed scheduling technique (GST) to treat procrastination. Discusses the elements of GST and its implementation. Initial student reactions to GST have been favorable. (Author/RC)

  5. 12 CFR 370.4 - Transaction Account Guarantee Program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... addition to the coverage afforded to depositors under 12 CFR Part 330, a depositor's funds in a noninterest... § 360.8 (12 CFR 360.8) for determining account balances at a failed insured depository institution...-bearing savings account, as defined in 12 CFR 204.2(d), will be guaranteed under the transaction...

  6. 12 CFR 370.4 - Transaction Account Guarantee Program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... addition to the coverage afforded to depositors under 12 CFR Part 330, a depositor's funds in a noninterest... § 360.8 (12 CFR 360.8) for determining account balances at a failed insured depository institution...-bearing savings account, as defined in 12 CFR 204.2(d), will be guaranteed under the transaction...

  7. 12 CFR 370.4 - Transaction Account Guarantee Program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... addition to the coverage afforded to depositors under 12 CFR Part 330, a depositor's funds in a noninterest... § 360.8 (12 CFR 360.8) for determining account balances at a failed insured depository institution...-bearing savings account, as defined in 12 CFR 204.2(d), will be guaranteed under the transaction...

  8. 5 CFR 317.703 - Guaranteed reinstatement: Presidential appointees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS EMPLOYMENT IN THE SENIOR EXECUTIVE SERVICE SES Career Appointment by Reinstatement § 317.703 Guaranteed reinstatement: Presidential appointees. (a) Eligibility for reinstatement. (1) A former SES career appointee who was appointed by the President to a civil service position outside the SES without a break...

  9. 7 CFR 4279.229 - Guaranteed loan funding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Guaranteed loan funding. 4279.229 Section 4279.229... authority to fund applications received by the end of the first application window, including those carried... the end of the first application window will be available to support applications received by the...

  10. 7 CFR 4279.229 - Guaranteed loan funding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Guaranteed loan funding. 4279.229 Section 4279.229... authority to fund applications received by the end of the first application window, including those carried... the end of the first application window will be available to support applications received by the...

  11. 7 CFR 4279.229 - Guaranteed loan funding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Guaranteed loan funding. 4279.229 Section 4279.229... authority to fund applications received by the end of the first application window, including those carried... the end of the first application window will be available to support applications received by the...

  12. 10 CFR 140.22 - Commission guarantee and reimbursement agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Commission guarantee and reimbursement agreements. 140.22 Section 140.22 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS Provisions Applicable Only to Applicants and Licensees Other Than Federal Agencies and Nonprofit Educational Institutions §...

  13. Do Lower Lender Subsidies Reduce Guaranteed Student Loan Supply?

    ERIC Educational Resources Information Center

    Austin, D. Andrew

    2010-01-01

    The article analyzes effects of borrower interest rates and student lender subsidies on federally guaranteed student loan volumes from 1988 to 1994 and from 1996 to 2006. Some have argued that lender subsidy cuts would reduce loan supply or cause lenders to exit the student loan market. If lenders get economic rents due to overly generous…

  14. 13 CFR 115.30 - Submission of Surety's guarantee application.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... days, or in the case of a bonding line, within 15 business days (see § 115.33(d)(2)) after Execution of... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Submission of Surety's guarantee application. 115.30 Section 115.30 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SURETY...

  15. 12 CFR 614.4800 - Guarantees and contracts of suretyship.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Guarantees and contracts of suretyship. 614.4800 Section 614.4800 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM LOAN POLICIES AND... another, or otherwise become a guarantor if an eligible cooperative substantially benefits from...

  16. Is Entrepreneurial Education at South African Universities Successful? An Empirical Example

    ERIC Educational Resources Information Center

    Mentoor, E. R.; Friedrich, C.

    2007-01-01

    After more than ten years of democracy in South Africa, many of the previously disadvantaged segments of the community, especially Blacks, would have hoped that a new economic order would have been created. Instead, South Africa still has very high unemployment and even young Black South Africans with a degree are not guaranteed a job. The purpose…

  17. Automated Assume-Guarantee Reasoning by Abstraction Refinement

    NASA Technical Reports Server (NTRS)

    Pasareanu, Corina S.; Giannakopoulous, Dimitra; Glannakopoulou, Dimitra

    2008-01-01

    Current automated approaches for compositional model checking in the assume-guarantee style are based on learning of assumptions as deterministic automata. We propose an alternative approach based on abstraction refinement. Our new method computes the assumptions for the assume-guarantee rules as conservative and not necessarily deterministic abstractions of some of the components, and refines those abstractions using counter-examples obtained from model checking them together with the other components. Our approach also exploits the alphabets of the interfaces between components and performs iterative refinement of those alphabets as well as of the abstractions. We show experimentally that our preliminary implementation of the proposed alternative achieves similar or better performance than a previous learning-based implementation.

  18. MRAC Revisited: Guaranteed Performance with Reference Model Modification

    NASA Technical Reports Server (NTRS)

    Stepanyan, Vahram; Krishnakumar, Kalmaje

    2010-01-01

    This paper presents modification of the conventional model reference adaptive control (MRAC) architecture in order to achieve guaranteed transient performance both in the output and input signals of an uncertain system. The proposed modification is based on the tracking error feedback to the reference model. It is shown that approach guarantees tracking of a given command and the ideal control signal (one that would be designed if the system were known) not only asymptotically but also in transient by a proper selection of the error feedback gain. The method prevents generation of high frequency oscillations that are unavoidable in conventional MRAC systems for large adaptation rates. The provided design guideline makes it possible to track a reference command of any magnitude form any initial position without re-tuning. The benefits of the method are demonstrated in simulations.

  19. Adaptive signed distance transform for curves with guaranteed error bounds

    SciTech Connect

    Laney, D A; Duchaineau, M A; Max, N L

    2000-12-04

    We present an adaptive signed distance transform algorithm for curves in the plane. The algorithm provides guaranteed error bounds with a selective refinement approach. The domain over which the signed distance function is desired is adaptive triangulated and piecewise discontinuous linear approximations are constructed within each triangle. The resulting transform performs work only were requested and does not rely on a preset sampling rate or other constraints.

  20. 13 CFR 115.18 - Refusal to issue further guarantees; suspension and termination of PSB status.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SMALL BUSINESS ADMINISTRATION SURETY BOND GUARANTEE Provisions for All Surety Bond Guarantees § 115.18... require submission of a Statement of Personal History (SBA Form 912) from any of these Persons. (d)...

  1. Guaranteeing global synchronization in networks with stochastic interactions

    NASA Astrophysics Data System (ADS)

    Klinglmayr, Johannes; Kirst, Christoph; Bettstetter, Christian; Timme, Marc

    2012-07-01

    We design the interactions between oscillators communicating via variably delayed pulse coupling to guarantee their synchronization on arbitrary network topologies. We identify a class of response functions and prove convergence to network-wide synchrony from arbitrary initial conditions. Synchrony is achieved if the pulse emission is unreliable or intentionally probabilistic. These results support the design of scalable, reliable and energy-efficient communication protocols for fully distributed synchronization as needed, e.g., in mobile phone networks, embedded systems, sensor networks and autonomously interacting swarm robots.

  2. Lattice Cleaving: A Multimaterial Tetrahedral Meshing Algorithm with Guarantees

    PubMed Central

    Bronson, Jonathan; Levine, Joshua A.; Whitaker, Ross

    2014-01-01

    We introduce a new algorithm for generating tetrahedral meshes that conform to physical boundaries in volumetric domains consisting of multiple materials. The proposed method allows for an arbitrary number of materials, produces high-quality tetrahedral meshes with upper and lower bounds on dihedral angles, and guarantees geometric fidelity. Moreover, the method is combinatoric so its implementation enables rapid mesh construction. These meshes are structured in a way that also allows grading, to reduce element counts in regions of homogeneity. Additionally, we provide proofs showing that both element quality and geometric fidelity are bounded using this approach. PMID:24356365

  3. 43 CFR 3809.574 - What happens if I have an existing corporate guarantee?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What happens if I have an existing corporate guarantee? 3809.574 Section 3809.574 Public Lands: Interior Regulations Relating to Public Lands... happens if I have an existing corporate guarantee? (a) If you have an existing corporate guarantee...

  4. 43 CFR 3809.574 - What happens if I have an existing corporate guarantee?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What happens if I have an existing corporate guarantee? 3809.574 Section 3809.574 Public Lands: Interior Regulations Relating to Public Lands... happens if I have an existing corporate guarantee? (a) If you have an existing corporate guarantee...

  5. 20 CFR 229.10 - What the social security overall minimum guarantee is.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true What the social security overall minimum... RAILROAD RETIREMENT ACT SOCIAL SECURITY OVERALL MINIMUM GUARANTEE Social Security Overall Minimum Guarantee Defined § 229.10 What the social security overall minimum guarantee is. The social security...

  6. 20 CFR 229.10 - What the social security overall minimum guarantee is.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false What the social security overall minimum... RAILROAD RETIREMENT ACT SOCIAL SECURITY OVERALL MINIMUM GUARANTEE Social Security Overall Minimum Guarantee Defined § 229.10 What the social security overall minimum guarantee is. The social security...

  7. 20 CFR 229.10 - What the social security overall minimum guarantee is.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true What the social security overall minimum... RAILROAD RETIREMENT ACT SOCIAL SECURITY OVERALL MINIMUM GUARANTEE Social Security Overall Minimum Guarantee Defined § 229.10 What the social security overall minimum guarantee is. The social security...

  8. 50 CFR 253.12 - Guaranteed note, U.S. note, and security documents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Guaranteed note, U.S. note, and security documents. 253.12 Section 253.12 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC... Fisheries Obligation Guarantee Program § 253.12 Guaranteed note, U.S. note, and security documents....

  9. 77 FR 44239 - Application for Long-Term Loan or Financial Guarantee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... UNITED STATES Application for Long-Term Loan or Financial Guarantee Reason for Notice This Notice is to... long-term loan or financial guarantee in excess of $100 million (as calculated in accordance with... final commitment for a long-term loan or financial guarantee in excess of $100 million....

  10. 75 FR 21521 - Surety Bond Guarantee Program; Disaster and Miscellaneous Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... BUSINESS ADMINISTRATION 13 CFR Part 115 RIN 3245-AF77 Surety Bond Guarantee Program; Disaster and... Improvements Act of 2008 for issuing surety bond guarantees for contracts and orders related to a major... approve, under certain conditions, an SBA bond guarantee on an individual Contract or Order up to...

  11. 7 CFR 457.128 - Guaranteed production plan of fresh market tomato crop insurance provisions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Guaranteed production plan of fresh market tomato crop... § 457.128 Guaranteed production plan of fresh market tomato crop insurance provisions. The Guaranteed Production Plan of Fresh Market Tomato Crop Insurance FCIC Policies Department of Agriculture Federal...

  12. 7 CFR 457.128 - Guaranteed production plan of fresh market tomato crop insurance provisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Guaranteed production plan of fresh market tomato crop... § 457.128 Guaranteed production plan of fresh market tomato crop insurance provisions. The Guaranteed Production Plan of Fresh Market Tomato Crop Insurance FCIC Policies Department of Agriculture Federal...

  13. 7 CFR 457.128 - Guaranteed production plan of fresh market tomato crop insurance provisions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Guaranteed production plan of fresh market tomato crop... § 457.128 Guaranteed production plan of fresh market tomato crop insurance provisions. The Guaranteed Production Plan of Fresh Market Tomato Crop Insurance FCIC Policies Department of Agriculture Federal...

  14. 7 CFR 457.128 - Guaranteed production plan of fresh market tomato crop insurance provisions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Guaranteed production plan of fresh market tomato crop... § 457.128 Guaranteed production plan of fresh market tomato crop insurance provisions. The Guaranteed Production Plan of Fresh Market Tomato Crop Insurance FCIC Policies Department of Agriculture Federal...

  15. 7 CFR 457.128 - Guaranteed production plan of fresh market tomato crop insurance provisions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Guaranteed production plan of fresh market tomato crop... § 457.128 Guaranteed production plan of fresh market tomato crop insurance provisions. The Guaranteed Production Plan of Fresh Market Tomato Crop Insurance FCIC Policies Department of Agriculture Federal...

  16. 7 CFR 4279.75 - Sale or assignment of guaranteed loan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Sale or assignment of guaranteed loan. 4279.75 Section 4279.75 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING General § 4279.75 Sale or assignment of guaranteed...

  17. 7 CFR 760.634 - SURE guarantee for value loss crops.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... associated with that species. (c) In the case of an insurable value loss crop for which crop insurance... 7 Agriculture 7 2011-01-01 2011-01-01 false SURE guarantee for value loss crops. 760.634 Section... Payments Program § 760.634 SURE guarantee for value loss crops. (a) The SURE guarantee for value loss...

  18. 7 CFR 1786.202 - Prepayment and refinancing of RUS guaranteed FFB loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Prepayment and refinancing of RUS guaranteed FFB...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) PREPAYMENT OF RUS GUARANTEED AND INSURED LOANS TO ELECTRIC AND TELEPHONE BORROWERS Refinancing and Prepayment of RUS Guaranteed FFB...

  19. 13 CFR 120.521 - What interest rate applies after SBA purchases its guaranteed portion?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What interest rate applies after SBA purchases its guaranteed portion? 120.521 Section 120.521 Business Credit and Assistance SMALL... purchases its guaranteed portion? When SBA purchases the guaranteed portion of a fixed interest rate...

  20. 7 CFR 760.634 - SURE guarantee for value loss crops.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false SURE guarantee for value loss crops. 760.634 Section... Payments Program § 760.634 SURE guarantee for value loss crops. (a) The SURE guarantee for value loss crops... otherwise specified. (1) For each insurable crop on the farm, 115 percent of the product obtained...

  1. 20 CFR 229.10 - What the social security overall minimum guarantee is.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false What the social security overall minimum... RAILROAD RETIREMENT ACT SOCIAL SECURITY OVERALL MINIMUM GUARANTEE Social Security Overall Minimum Guarantee Defined § 229.10 What the social security overall minimum guarantee is. The social security...

  2. 20 CFR 229.10 - What the social security overall minimum guarantee is.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false What the social security overall minimum... RAILROAD RETIREMENT ACT SOCIAL SECURITY OVERALL MINIMUM GUARANTEE Social Security Overall Minimum Guarantee Defined § 229.10 What the social security overall minimum guarantee is. The social security...

  3. 7 CFR 1717.655 - Exclusion of certain investments, loans, and guarantees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... repay, regardless of the source or purpose of the grant; and (ii) Loans received from or guaranteed by..., provided that the borrower uses the loan proceeds for such purpose; (2) Make loans guaranteed by an agency... that serves primarily consumers located in rural areas as defined in 7 CFR 1710.2, and guarantee...

  4. 7 CFR 762.129 - Percent of guarantee and maximum loss.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Percent of guarantee and maximum loss. 762.129 Section 762.129 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS § 762.129 Percent of guarantee and...

  5. 7 CFR 1493.50 - Certification requirements for obtaining payment guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.50 Certification requirements for obtaining payment.... If the exporter breaches or violates these certifications with respect to a GSM-102 or...

  6. 7 CFR 1493.50 - Certification requirements for obtaining payment guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program... requirements of § 1493.30, and the exporter will immediately notify CCC if there is a change of...

  7. 7 CFR 1493.50 - Certification requirements for obtaining payment guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program... requirements of § 1493.30, and the exporter will immediately notify CCC if there is a change of...

  8. 7 CFR 1493.50 - Certification requirements for obtaining payment guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program... requirements of § 1493.30, and the exporter will immediately notify CCC if there is a change of...

  9. 34 CFR 682.500 - Circumstances under which loans may be guaranteed by the Secretary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... loans may be guaranteed by the Secretary. (a) The Secretary may guarantee all— (1) FISL, Federal SLS... lender; and (3) FISL, Federal SLS, Federal PLUS, and Federal Consolidation loans made by lenders located... students who meet the agency's residency requirements. (b) The Secretary may guarantee FISL, Federal...

  10. 34 CFR 682.500 - Circumstances under which loans may be guaranteed by the Secretary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... loans may be guaranteed by the Secretary. (a) The Secretary may guarantee all— (1) FISL, Federal SLS... lender; and (3) FISL, Federal SLS, Federal PLUS, and Federal Consolidation loans made by lenders located... students who meet the agency's residency requirements. (b) The Secretary may guarantee FISL, Federal...

  11. 34 CFR 682.500 - Circumstances under which loans may be guaranteed by the Secretary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... loans may be guaranteed by the Secretary. (a) The Secretary may guarantee all— (1) FISL, Federal SLS... lender; and (3) FISL, Federal SLS, Federal PLUS, and Federal Consolidation loans made by lenders located... students who meet the agency's residency requirements. (b) The Secretary may guarantee FISL, Federal...

  12. 34 CFR 682.500 - Circumstances under which loans may be guaranteed by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... may be guaranteed by the Secretary. (a) The Secretary may guarantee all— (1) FISL, Federal SLS, and... lender; and (3) FISL, Federal SLS, Federal PLUS, and Federal Consolidation loans made by lenders located... students who meet the agency's residency requirements. (b) The Secretary may guarantee FISL, Federal...

  13. 13 CFR 120.521 - What interest rate applies after SBA purchases its guaranteed portion?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false What interest rate applies after SBA purchases its guaranteed portion? 120.521 Section 120.521 Business Credit and Assistance SMALL... purchases its guaranteed portion? When SBA purchases the guaranteed portion of a fixed interest rate...

  14. 13 CFR 120.521 - What interest rate applies after SBA purchases its guaranteed portion?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false What interest rate applies after SBA purchases its guaranteed portion? 120.521 Section 120.521 Business Credit and Assistance SMALL... purchases its guaranteed portion? When SBA purchases the guaranteed portion of a fixed interest rate...

  15. 7 CFR 1493.50 - Certification requirements for obtaining payment guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CREDIT GUARANTEE PROGRAMS CCC Export Credit Guarantee Program (GSM-102) and CCC Intermediate Export Credit Guarantee Program (GSM-103) Operations § 1493.50 Certification requirements for obtaining payment.... If the exporter breaches or violates these certifications with respect to a GSM-102 or...

  16. 26 CFR 1.166-10 - Reserve for guaranteed debt obligations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Reserve for guaranteed debt obligations. 1.166....166-10 Reserve for guaranteed debt obligations. (a) Definitions. The following provisions apply for... regularly sells property in the ordinary course of the person's trade or business. (2) Guaranteed...

  17. Resilient guaranteed cost control of a power system.

    PubMed

    Soliman, Hisham M; Soliman, Mostafa H; Hassan, Mohammad F

    2014-05-01

    With the development of power system interconnection, the low-frequency oscillation is becoming more and more prominent which may cause system separation and loss of energy to consumers. This paper presents an innovative robust control for power systems in which the operating conditions are changing continuously due to load changes. However, practical implementation of robust control can be fragile due to controller inaccuracies (tolerance of resistors used with operational amplifiers). A new design of resilient (non-fragile) robust control is given that takes into consideration both model and controller uncertainties by an iterative solution of a set of linear matrix inequalities (LMI). Both uncertainties are cast into a norm-bounded structure. A sufficient condition is derived to achieve the desired settling time for damping power system oscillations in face of plant and controller uncertainties. Furthermore, an improved controller design, resilient guaranteed cost controller, is derived to achieve oscillations damping in a guaranteed cost manner. The effectiveness of the algorithm is shown for a single machine infinite bus system, and then, it is extended to multi-area power system. PMID:25685505

  18. Resilient guaranteed cost control of a power system

    PubMed Central

    Soliman, Hisham M.; Soliman, Mostafa H.; Hassan, Mohammad. F.

    2013-01-01

    With the development of power system interconnection, the low-frequency oscillation is becoming more and more prominent which may cause system separation and loss of energy to consumers. This paper presents an innovative robust control for power systems in which the operating conditions are changing continuously due to load changes. However, practical implementation of robust control can be fragile due to controller inaccuracies (tolerance of resistors used with operational amplifiers). A new design of resilient (non-fragile) robust control is given that takes into consideration both model and controller uncertainties by an iterative solution of a set of linear matrix inequalities (LMI). Both uncertainties are cast into a norm-bounded structure. A sufficient condition is derived to achieve the desired settling time for damping power system oscillations in face of plant and controller uncertainties. Furthermore, an improved controller design, resilient guaranteed cost controller, is derived to achieve oscillations damping in a guaranteed cost manner. The effectiveness of the algorithm is shown for a single machine infinite bus system, and then, it is extended to multi-area power system. PMID:25685505

  19. GMG: A Guaranteed, Efficient Global Optimization Algorithm for Remote Sensing.

    SciTech Connect

    D'Helon, CD

    2004-08-18

    The monocular passive ranging (MPR) problem in remote sensing consists of identifying the precise range of an airborne target (missile, plane, etc.) from its observed radiance. This inverse problem may be set as a global optimization problem (GOP) whereby the difference between the observed and model predicted radiances is minimized over the possible ranges and atmospheric conditions. Using additional information about the error function between the predicted and observed radiances of the target, we developed GMG, a new algorithm to find the Global Minimum with a Guarantee. The new algorithm transforms the original continuous GOP into a discrete search problem, thereby guaranteeing to find the position of the global minimum in a reasonably short time. The algorithm is first applied to the golf course problem, which serves as a litmus test for its performance in the presence of both complete and degraded additional information. GMG is further assessed on a set of standard benchmark functions and then applied to various realizations of the MPR problem.

  20. Feature Selection for Ridge Regression with Provable Guarantees.

    PubMed

    Paul, Saurabh; Drineas, Petros

    2016-04-01

    We introduce single-set spectral sparsification as a deterministic sampling-based feature selection technique for regularized least-squares classification, which is the classification analog to ridge regression. The method is unsupervised and gives worst-case guarantees of the generalization power of the classification function after feature selection with respect to the classification function obtained using all features. We also introduce leverage-score sampling as an unsupervised randomized feature selection method for ridge regression. We provide risk bounds for both single-set spectral sparsification and leverage-score sampling on ridge regression in the fixed design setting and show that the risk in the sampled space is comparable to the risk in the full-feature space. We perform experiments on synthetic and real-world data sets; a subset of TechTC-300 data sets, to support our theory. Experimental results indicate that the proposed methods perform better than the existing feature selection methods. PMID:26890353

  1. Guaranteed ride home: Taking the worry out of ridesharing

    SciTech Connect

    Not Available

    1990-11-01

    The report describes how to set up a guaranteed ride home (GRH) program as an element of an integrated commuter transportation program. Such programs promote ridesharing by making sure carpool or vanpool members have transportation available to them if an emergency arises or if they have to work late. The costs of such GRH programs are relatively low, since they are used infrequently, but they have high value as an insurance policy for potential ridesharers. Options for providing such rides include company cars, subsidized taxi service, rental cars, community sponsored shuttles, and arrangements with the local transit operator. The document describes how to set up a GRH programs, explores the various options for providing service, and describes the experiences of a number of programs in Southern California.

  2. A methodology aimed to guarantee technology continuity in health structures.

    PubMed

    Miniati, R; Dori, F; Iadanza, E; Scatizzi, L; Niccolini, F; Sarti, A

    2011-01-01

    In healthcare the importance of clinical continuity is essential for both patients life and health organization activity. Since technology continuity is having more and more importance for the service continuity, a correct management of medical devices must be guided by criteria that ensure its safe, appropriate and economical use through a well planned purchase, appropriate preventive and corrective maintenance Indeed, the aim of health technology managers is to optimize the integration of external interventions assistance and internal technical service to guarantee an efficient and cost-effective maintenance system. This paper proposes an innovative carefully thought methodology which is aimed to provide technological and procedural actions which offer support to decision makers in technology management regarding the implementation of continuity in medical services and response to technology failures and emergency events. PMID:22254534

  3. Feature-Sensitive Tetrahedral Mesh Generation with Guaranteed Quality

    PubMed Central

    Wang, Jun; Yu, Zeyun

    2012-01-01

    Tetrahedral meshes are being extensively used in finite element methods (FEM). This paper proposes an algorithm to generate feature-sensitive and high-quality tetrahedral meshes from an arbitrary surface mesh model. A top-down octree subdivision is conducted on the surface mesh and a set of tetrahedra are constructed using adaptive body-centered cubic (BCC) lattices. Special treatments are given to the tetrahedra near the surface such that the quality of the resulting tetrahedral mesh is provably guaranteed: the smallest dihedral angle is always greater than 5.71°. The meshes generated by our method are not only adaptive from the interior to the boundary, but also feature-sensitive on the surface with denser elements in high-curvature regions where geometric feature most likely reside. A variety of experimental results are presented to demonstrate the effectiveness and robustness of this algorithm. PMID:22328787

  4. View looking south from pavilion, showing south entrance house, south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking south from pavilion, showing south entrance house, south wing, and engine house - Fairmount Waterworks, East bank of Schuylkill River, Aquarium Drive, Philadelphia, Philadelphia County, PA

  5. 7 CFR 3575.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 3575.73 Section 3575.73..., mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. (a) Replacement of...

  6. 7 CFR 3575.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 3575.73 Section 3575.73..., mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. (a) Replacement of...

  7. 7 CFR 1779.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 1779.73 Section 1779.73..., theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee...

  8. 7 CFR 1779.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 1779.73 Section 1779.73..., theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee...

  9. 7 CFR 3575.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 3575.73 Section 3575.73..., mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. (a) Replacement of...

  10. 7 CFR 3575.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 3575.73 Section 3575.73..., mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. (a) Replacement of...

  11. 7 CFR 1779.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 1779.73 Section 1779.73..., theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee...

  12. 7 CFR 1779.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 1779.73 Section 1779.73..., theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee...

  13. 7 CFR 3575.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 3575.73 Section 3575.73..., mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. (a) Replacement of...

  14. 7 CFR 1779.73 - Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Replacement of loss, theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee Agreement. 1779.73 Section 1779.73..., theft, destruction, mutilation, or defacement of Loan Note Guarantee or Assignment Guarantee...

  15. South Africa

    Atmospheric Science Data Center

    2013-04-16

    ... atmospheric and oceanic conditions. At Elands Bay in South Africa's Western Cape province, about 1000 tons of rock lobsters beached ... red tide. At the same time, people came from across South Africa to gather the undersized creatures for food. The effects of the losses ...

  16. Strong experimental guarantees in ultrafast quantum random number generation

    NASA Astrophysics Data System (ADS)

    Mitchell, Morgan W.; Abellan, Carlos; Amaya, Waldimar

    2015-01-01

    We describe a methodology and standard of proof for experimental claims of quantum random-number generation (QRNG), analogous to well-established methods from precision measurement. For appropriately constructed physical implementations, lower bounds on the quantum contribution to the average min-entropy can be derived from measurements on the QRNG output. Given these bounds, randomness extractors allow generation of nearly perfect "ɛ -random" bit streams. An analysis of experimental uncertainties then gives experimentally derived confidence levels on the ɛ randomness of these sequences. We demonstrate the methodology by application to phase-diffusion QRNG, driven by spontaneous emission as a trusted randomness source. All other factors, including classical phase noise, amplitude fluctuations, digitization errors, and correlations due to finite detection bandwidth, are treated with paranoid caution, i.e., assuming the worst possible behaviors consistent with observations. A data-constrained numerical optimization of the distribution of untrusted parameters is used to lower bound the average min-entropy. Under this paranoid analysis, the QRNG remains efficient, generating at least 2.3 quantum random bits per symbol with 8-bit digitization and at least 0.83 quantum random bits per symbol with binary digitization at a confidence level of 0.999 93. The result demonstrates ultrafast QRNG with strong experimental guarantees.

  17. On routing algorithms with end-to-end delay guarantees

    SciTech Connect

    Rao, N.S.V.; Batsell, S.G.

    1998-11-01

    The authors consider the transmission of a message of size r from a source to a destination with guarantees on the end-to-end delay over a computer network with n nodes and m links. There are three sources of delays: (a) propagation delays along the links, (b) delays due to bandwidth availability on the links, and (c) queuing delays at the intermediate nodes. First, the authors consider that delays on various links and nodes are given as functions of the message size. If the delay in (b) is a non-increasing function of the bandwidth, they propose O(m{sup 2} + mn log n) time algorithm to compute a path with the minimum end-to-end delay for any given message size r. They then consider that the queuing delay in (c) is a random variable correlated with the message size according to an unknown distribution. At each node, the measurements of queuing delays and message sizes are available. They propose two algorithms to compute paths whose delays are close to optimal delays with a high probability, irrespective of the distribution of the delays, and based entirely on the measurements of sufficient size.

  18. Guaranteed Blind Sparse Spikes Deconvolution via Lifting and Convex Optimization

    NASA Astrophysics Data System (ADS)

    Chi, Yuejie

    2016-06-01

    Neural recordings, returns from radars and sonars, images in astronomy and single-molecule microscopy can be modeled as a linear superposition of a small number of scaled and delayed copies of a band-limited or diffraction-limited point spread function, which is either determined by the nature or designed by the users; in other words, we observe the convolution between a point spread function and a sparse spike signal with unknown amplitudes and delays. While it is of great interest to accurately resolve the spike signal from as few samples as possible, however, when the point spread function is not known a priori, this problem is terribly ill-posed. This paper proposes a convex optimization framework to simultaneously estimate the point spread function as well as the spike signal, by mildly constraining the point spread function to lie in a known low-dimensional subspace. By applying the lifting trick, we obtain an underdetermined linear system of an ensemble of signals with joint spectral sparsity, to which atomic norm minimization is applied. Under mild randomness assumptions of the low-dimensional subspace as well as a separation condition of the spike signal, we prove the proposed algorithm, dubbed as AtomicLift, is guaranteed to recover the spike signal up to a scaling factor as soon as the number of samples is large enough. The extension of AtomicLift to handle noisy measurements is also discussed. Numerical examples are provided to validate the effectiveness of the proposed approaches.

  19. Functional modules of sigma factor regulons guarantee adaptability and evolvability

    PubMed Central

    Binder, Sebastian C.; Eckweiler, Denitsa; Schulz, Sebastian; Bielecka, Agata; Nicolai, Tanja; Franke, Raimo; Häussler, Susanne; Meyer-Hermann, Michael

    2016-01-01

    The focus of modern molecular biology turns from assigning functions to individual genes towards understanding the expression and regulation of complex sets of molecules. Here, we provide evidence that alternative sigma factor regulons in the pathogen Pseudomonas aeruginosa largely represent insulated functional modules which provide a critical level of biological organization involved in general adaptation and survival processes. Analysis of the operational state of the sigma factor network revealed that transcription factors functionally couple the sigma factor regulons and significantly modulate the transcription levels in the face of challenging environments. The threshold quality of newly evolved transcription factors was reached faster and more robustly in in silico testing when the structural organization of sigma factor networks was taken into account. These results indicate that the modular structures of alternative sigma factor regulons provide P. aeruginosa with a robust framework to function adequately in its environment and at the same time facilitate evolutionary change. Our data support the view that widespread modularity guarantees robustness of biological networks and is a key driver of evolvability. PMID:26915971

  20. Functional modules of sigma factor regulons guarantee adaptability and evolvability.

    PubMed

    Binder, Sebastian C; Eckweiler, Denitsa; Schulz, Sebastian; Bielecka, Agata; Nicolai, Tanja; Franke, Raimo; Häussler, Susanne; Meyer-Hermann, Michael

    2016-01-01

    The focus of modern molecular biology turns from assigning functions to individual genes towards understanding the expression and regulation of complex sets of molecules. Here, we provide evidence that alternative sigma factor regulons in the pathogen Pseudomonas aeruginosa largely represent insulated functional modules which provide a critical level of biological organization involved in general adaptation and survival processes. Analysis of the operational state of the sigma factor network revealed that transcription factors functionally couple the sigma factor regulons and significantly modulate the transcription levels in the face of challenging environments. The threshold quality of newly evolved transcription factors was reached faster and more robustly in in silico testing when the structural organization of sigma factor networks was taken into account. These results indicate that the modular structures of alternative sigma factor regulons provide P. aeruginosa with a robust framework to function adequately in its environment and at the same time facilitate evolutionary change. Our data support the view that widespread modularity guarantees robustness of biological networks and is a key driver of evolvability. PMID:26915971

  1. GMG - A guaranteed global optimization algorithm: Application to remote sensing

    SciTech Connect

    D'Helon, Cassius; Protopopescu, Vladimir A; Wells, Jack C; Barhen, Jacob

    2007-01-01

    We investigate the role of additional information in reducing the computational complexity of the global optimization problem (GOP). Following this approach, we develop GMG -- an algorithm to find the Global Minimum with a Guarantee. The new algorithm breaks up an originally continuous GOP into a discrete (grid) search problem followed by a descent problem. The discrete search identifies the basin of attraction of the global minimum after which the actual location of the minimizer is found upon applying a descent algorithm. The algorithm is first applied to the golf course problem, which serves as a litmus test for its performance in the presence of both complete and degraded additional information. GMG is further assessed on a set of standard benchmark functions. We then illustrate the performance of the the validated algorithm on a simple realization of the monocular passive ranging (MPR) problem in remote sensing, which consists of identifying the range of an airborne target (missile, plane, etc.) from its observed radiance. This inverse problem is set as a GOP whereby the difference between the observed and model predicted radiances is minimized over the possible ranges and atmospheric conditions. We solve the GOP using GMG and report on the performance of the algorithm.

  2. Functional modules of sigma factor regulons guarantee adaptability and evolvability

    NASA Astrophysics Data System (ADS)

    Binder, Sebastian C.; Eckweiler, Denitsa; Schulz, Sebastian; Bielecka, Agata; Nicolai, Tanja; Franke, Raimo; Häussler, Susanne; Meyer-Hermann, Michael

    2016-02-01

    The focus of modern molecular biology turns from assigning functions to individual genes towards understanding the expression and regulation of complex sets of molecules. Here, we provide evidence that alternative sigma factor regulons in the pathogen Pseudomonas aeruginosa largely represent insulated functional modules which provide a critical level of biological organization involved in general adaptation and survival processes. Analysis of the operational state of the sigma factor network revealed that transcription factors functionally couple the sigma factor regulons and significantly modulate the transcription levels in the face of challenging environments. The threshold quality of newly evolved transcription factors was reached faster and more robustly in in silico testing when the structural organization of sigma factor networks was taken into account. These results indicate that the modular structures of alternative sigma factor regulons provide P. aeruginosa with a robust framework to function adequately in its environment and at the same time facilitate evolutionary change. Our data support the view that widespread modularity guarantees robustness of biological networks and is a key driver of evolvability.

  3. μ distortions or running: A guaranteed discovery from CMB spectrometry

    NASA Astrophysics Data System (ADS)

    Cabass, Giovanni; Melchiorri, Alessandro; Pajer, Enrico

    2016-04-01

    We discuss the implications of a PIXIE-like experiment, which would measure μ -type spectral distortions of the cosmic microwave background (CMB) at a level of σμ=(1 /n )×10-8 , with n ≥1 representing an improved sensitivity (e.g. n =10 corresponds to PRISM). Using Planck data and considering the six-parameter Λ CDM model, we compute the posterior for μ8≡μ ×108 and find μ8=1.5 7-0.13+0.11 (68% C.L.). This becomes μ8=1.2 8-0.52+0.30 (68% C.L.) when the running αs of the spectral index is included. We point out that a sensitivity of about 3 ×PIXIE implies a guaranteed discovery: μ distortion is detected or αs≥0 is excluded (both at 95% C.L. or higher). This threshold sensitivity sets a clear benchmark for CMB spectrometry. For a combined analysis of PIXIE and current Planck data, we discuss the improvement on measurements of the tilt ns and the running αs and the dependence on the choice of the pivot. A fiducial running of αs=-0.01 (close to the Planck best fit) leads to a detection of negative running at 2 σ for 5 ×PIXIE . A fiducial running of αs=-0.02 , still compatible with Planck, requires 3 ×PIXIE to rule out αs=0 (at 95% C.L.). We propose a convenient and compact visualization of the improving constraints on the tilt, running and tensor-to-scalar ratio.

  4. 7 CFR 4279.187 - Refusal to execute Loan Note Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Refusal to execute Loan Note Guarantee. 4279.187 Section 4279.187 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business...

  5. 7 CFR 4279.187 - Refusal to execute Loan Note Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Refusal to execute Loan Note Guarantee. 4279.187 Section 4279.187 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business...

  6. 7 CFR 4279.187 - Refusal to execute Loan Note Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Refusal to execute Loan Note Guarantee. 4279.187 Section 4279.187 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business...

  7. 7 CFR 4279.187 - Refusal to execute Loan Note Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Refusal to execute Loan Note Guarantee. 4279.187 Section 4279.187 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GUARANTEED LOANMAKING Business...

  8. 29 CFR Appendix B to Part 4011 - Table of Maximum Guaranteed Benefits

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regulation on computation of maximum guaranteeable benefits (29 CFR 4022.22). ... 29 Labor 9 2010-07-01 2010-07-01 false Table of Maximum Guaranteed Benefits B Appendix B to Part... REPORTING AND DISCLOSURE REQUIREMENTS DISCLOSURE TO PARTICIPANTS Pt. 4011, App. B Appendix B to Part...

  9. Reflections on Basic Education under the "Three Guarantees" Policy in Tibet's Pastoral Districts

    ERIC Educational Resources Information Center

    Zhiyong, Zhu

    2008-01-01

    The "two exemptions and one subsidy" (TEOS) policy presages the coming of an era of free education in compulsory education. Actually, the agricultural and pastoral districts of China's Tibet Autonomous Region had already experienced policies of free compulsory education in the mid-1980s, that is, the "three guarantees" ("sanbao") (guaranteed food,…

  10. 7 CFR 1779.63 - Conditions precedent to issuance of the Loan Note Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Conditions precedent to issuance of the Loan Note Guarantee. 1779.63 Section 1779.63 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) WATER AND WASTE DISPOSAL PROGRAMS GUARANTEED LOANS § 1779.63 Conditions precedent...

  11. 50 CFR 253.21 - Demand by guaranteed noteholder and payment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 9 2011-10-01 2011-10-01 false Demand by guaranteed noteholder and payment. 253.21 Section 253.21 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC... Fisheries Finance Program § 253.21 Demand by guaranteed noteholder and payment. Every demand by...

  12. 50 CFR 253.21 - Demand by guaranteed noteholder and payment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 11 2013-10-01 2013-10-01 false Demand by guaranteed noteholder and payment. 253.21 Section 253.21 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC... Fisheries Finance Program § 253.21 Demand by guaranteed noteholder and payment. Every demand by...

  13. 13 CFR 108.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... guarantees. 108.820 Section 108.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Financing of Small Businesses by NMVC Companies Structuring Nmvc Company's Financing of Eligible Small Businesses § 108.820 Financings in the form of guarantees. (a)...

  14. 13 CFR 107.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... guarantees. 107.820 Section 107.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Financing of Small Businesses by Licensees Structuring Licensee's Financing of Eligible Small Businesses: Types of Financing § 107.820 Financings in the form of guarantees....

  15. 13 CFR 108.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... guarantees. 108.820 Section 108.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Financing of Small Businesses by NMVC Companies Structuring Nmvc Company's Financing of Eligible Small Businesses § 108.820 Financings in the form of guarantees. (a)...

  16. 13 CFR 108.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... guarantees. 108.820 Section 108.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Financing of Small Businesses by NMVC Companies Structuring Nmvc Company's Financing of Eligible Small Businesses § 108.820 Financings in the form of guarantees. (a)...

  17. 13 CFR 107.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... guarantees. 107.820 Section 107.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Financing of Small Businesses by Licensees Structuring Licensee's Financing of Eligible Small Businesses: Types of Financing § 107.820 Financings in the form of guarantees....

  18. 13 CFR 107.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... guarantees. 107.820 Section 107.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Financing of Small Businesses by Licensees Structuring Licensee's Financing of Eligible Small Businesses: Types of Financing § 107.820 Financings in the form of guarantees....

  19. 13 CFR 108.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... guarantees. 108.820 Section 108.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Financing of Small Businesses by NMVC Companies Structuring Nmvc Company's Financing of Eligible Small Businesses § 108.820 Financings in the form of guarantees. (a)...

  20. 13 CFR 107.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... guarantees. 107.820 Section 107.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Financing of Small Businesses by Licensees Structuring Licensee's Financing of Eligible Small Businesses: Types of Financing § 107.820 Financings in the form of guarantees....

  1. 13 CFR 108.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... guarantees. 108.820 Section 108.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Financing of Small Businesses by NMVC Companies Structuring Nmvc Company's Financing of Eligible Small Businesses § 108.820 Financings in the form of guarantees. (a)...

  2. 13 CFR 107.820 - Financings in the form of guarantees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... guarantees. 107.820 Section 107.820 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Financing of Small Businesses by Licensees Structuring Licensee's Financing of Eligible Small Businesses: Types of Financing § 107.820 Financings in the form of guarantees....

  3. 13 CFR 120.715 - Does SBA guarantee any loans an Intermediary obtains from another source?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Does SBA guarantee any loans an Intermediary obtains from another source? 120.715 Section 120.715 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Microloan Program § 120.715 Does SBA guarantee any loans an Intermediary...

  4. 76 FR 13797 - Rural Broadband Access Loans and Loan Guarantees Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ...; ] DEPARTMENT OF AGRICULTURE Rural Utilities Service Rural Broadband Access Loans and Loan Guarantees Program... (FY) 2011 for the Rural Broadband Access Loan and Loan Guarantee program (the Broadband Program), subject to the availability of funding. This notice is being issued prior to passage of a...

  5. 76 FR 37779 - Rural Broadband Access Loans and Loan Guarantees Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... information and requirements on how applicants can apply for Rural Broadband Access Loans and Loan Guarantees... for the program published in the Federal Register at 76 FR 13770. FOR FURTHER INFORMATION CONTACT... Rural Utilities Service Rural Broadband Access Loans and Loan Guarantees Program AGENCY: Rural...

  6. 22 CFR 230.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Non-impairment of the Guarantee. 230.05 Section 230.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND...

  7. 22 CFR 230.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Non-impairment of the Guarantee. 230.05 Section 230.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND...

  8. 22 CFR 230.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Non-impairment of the Guarantee. 230.05 Section 230.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND...

  9. 22 CFR 230.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Non-impairment of the Guarantee. 230.05 Section 230.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND...

  10. 22 CFR 230.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Non-impairment of the Guarantee. 230.05 Section 230.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ISRAEL LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUB. L. 108-11-STANDARD TERMS AND...

  11. 13 CFR 120.520 - Purchase of 7(a) loan guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Purchase of 7(a) loan guarantees. 120.520 Section 120.520 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Servicing, Liquidation and Debt Collection Litigation of 7(a) and 504 Loans Sba's Purchase of A Guaranteed Portion § 120.520 Purchase of 7(a)...

  12. 13 CFR 120.520 - Purchase of 7(a) loan guarantees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Registered Holder, Lenders must provide SBA with a loan status report within 15 business days of such... Servicing, Liquidation and Debt Collection Litigation of 7(a) and 504 Loans Sba's Purchase of A Guaranteed Portion § 120.520 Purchase of 7(a) loan guarantees. (a) When SBA will purchase—(1) For loans approved...

  13. 49 CFR 260.45 - Events of default for guaranteed loans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Events of default for guaranteed loans. 260.45 Section 260.45 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS GOVERNING LOANS AND LOAN GUARANTEES UNDER THE RAILROAD REHABILITATION AND...

  14. 7 CFR 1940.564 - Section 502 subsidized guaranteed Rural Housing loans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Allocation of Loan and Grant Program Funds § 1940.564 Section 502 subsidized guaranteed Rural Housing loans... 7 Agriculture 13 2012-01-01 2012-01-01 false Section 502 subsidized guaranteed Rural Housing loans... HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE...

  15. 7 CFR 1940.564 - Section 502 subsidized guaranteed Rural Housing loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Allocation of Loan and Grant Program Funds § 1940.564 Section 502 subsidized guaranteed Rural Housing loans... 7 Agriculture 13 2010-01-01 2009-01-01 true Section 502 subsidized guaranteed Rural Housing loans... HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE...

  16. 7 CFR 1940.564 - Section 502 subsidized guaranteed Rural Housing loans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Allocation of Loan and Grant Program Funds § 1940.564 Section 502 subsidized guaranteed Rural Housing loans... 7 Agriculture 13 2014-01-01 2013-01-01 true Section 502 subsidized guaranteed Rural Housing loans... HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE...

  17. 7 CFR 1940.564 - Section 502 subsidized guaranteed Rural Housing loans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Allocation of Loan and Grant Program Funds § 1940.564 Section 502 subsidized guaranteed Rural Housing loans... 7 Agriculture 13 2011-01-01 2009-01-01 true Section 502 subsidized guaranteed Rural Housing loans... HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE...

  18. 7 CFR 1980.345 - Applicant eligibility requirements for a guaranteed loan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be used to offset other income in order to qualify for or increase the amount of RHS assistance. (c... 7 Agriculture 14 2011-01-01 2011-01-01 false Applicant eligibility requirements for a guaranteed... § 1980.345 Applicant eligibility requirements for a guaranteed loan. Applicants who meet the...

  19. Guaranteed Student Loans. Lenders' Interest Billings Often Result in Overpayments. Report to Congressional Committees.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Div. of Human Resources.

    Lenders' billings for interest subsidy payments under the Department of Education's Guaranteed Student Loan Program (GSLP) are discussed. In fiscal year 1986, the Department of Education paid lenders $2.4 billion in interest subsidies on $39 billion of outstanding Guaranteed Student Loans. The General Accounting Office (GAO) reviewed the accounts…

  20. 7 CFR 1717.655 - Exclusion of certain investments, loans, and guarantees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... that serves primarily consumers located in rural areas as defined in 7 CFR 1710.2, and guarantee debt...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED... guarantees not to exceed 20 percent of the borrower's equity: (A) Water and waste disposal systems; (B)...

  1. 22 CFR 233.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Non-impairment of the Guarantee. 233.05 Section 233.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT HASHEMITE KINGDOM OF JORDAN LOAN GUARANTEES ISSUED UNDER THE FURTHER CONTINUING APPROPRIATIONS ACT, 2013, DIV. F, PUB. L. 113-6-STANDARD...

  2. 7 CFR 1980.443 - Collateral, personal and corporate guarantees and other requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Collateral, personal and corporate guarantees and... Industrial Loan Program § 1980.443 Collateral, personal and corporate guarantees and other requirements. (a... receivable, cash or special cash collateral accounts, marketable securities and cash surrender value of...

  3. 77 FR 2310 - Notice of Submission of Proposed Information Collection to OMB; Builder's Certification/Guarantee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Certification/Guarantee and New Construction Subterranean Termite Soil Treatment Record AGENCY: Office of the... provide a record of any soil treatment methods used to prevent subterranean termite infestation. The...: Builder's Certification/Guarantee and New Construction Subterranean Termite Soil Treatment Record....

  4. 7 CFR 4280.126 - Guarantee/annual renewal fee percentages.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Guarantee/annual renewal fee percentages. 4280.126...-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Renewable Energy Systems and Energy Efficiency Improvements Program Section B. Guaranteed Loans § 4280.126...

  5. 7 CFR 762.144 - Repurchase of guaranteed portion from a secondary market holder.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Repurchase of guaranteed portion from a secondary market holder. 762.144 Section 762.144 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS §...

  6. 7 CFR 762.130 - Loan approval and issuing the guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Loan approval and issuing the guarantee. 762.130 Section 762.130 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS § 762.130 Loan approval and issuing...

  7. 22 CFR 232.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Non-impairment of the Guarantee. 232.05 Section 232.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REPUBLIC OF TUNISIA LOAN GUARANTEES ISSUED UNDER THE DEPARTMENT OF STATE, FOREIGN OPERATIONS, AND RELATED PROGRAMS APPROPRIATIONS ACT,...

  8. 77 FR 61580 - Federal Acquisition Regulation; Information Collection; Bid Guarantees, Performance and Payment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... since published in the Federal Register at 74 FR 46988, on September 14, 2009. Based on use of data... Regulation; Information Collection; Bid Guarantees, Performance and Payment Bonds, and Alternative Payment... concerning bid guarantees, performance and payment bonds, and alternative payment protections....

  9. 24 CFR 1000.426 - How does HUD review a guarantee application?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... application? 1000.426 Section 1000.426 Housing and Urban Development Regulations Relating to Housing and Urban... URBAN DEVELOPMENT NATIVE AMERICAN HOUSING ACTIVITIES Federal Guarantees for Financing of Tribal Housing Activities § 1000.426 How does HUD review a guarantee application? The procedure for review of a...

  10. 7 CFR 1493.250 - Final application and issuance of a facility payment guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., quantities of such items, delivery terms (e.g., FOB, CFR, CIF), delivery period(s), contract value, payment...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.250 Final application and issuance of...

  11. 7 CFR 1493.250 - Final application and issuance of a facility payment guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... services to be exported, quantities of such items, delivery terms (e.g., FOB, CFR, CIF), delivery period(s...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.250 Final...

  12. 7 CFR 1493.250 - Final application and issuance of a facility payment guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., quantities of such items, delivery terms (e.g., FOB, CFR, CIF), delivery period(s), contract value, payment...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.250 Final application and issuance of...

  13. 7 CFR 1493.250 - Final application and issuance of a facility payment guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., quantities of such items, delivery terms (e.g., FOB, CFR, CIF), delivery period(s), contract value, payment...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE EXPORT PROGRAMS CCC EXPORT CREDIT GUARANTEE PROGRAMS CCC Facility Guarantee Program (FGP) Operations § 1493.250 Final application and issuance of...

  14. 7 CFR 1717.655 - Exclusion of certain investments, loans, and guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Exclusion of certain investments, loans, and guarantees. 1717.655 Section 1717.655 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Investments,...

  15. 12 CFR 324.135 - Guarantees and credit derivatives: Double default treatment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Guarantees and credit derivatives: Double... Risk § 324.135 Guarantees and credit derivatives: Double default treatment. (a) Eligibility and operational criteria for double default treatment. An FDIC-supervised institution may recognize the...

  16. 12 CFR 217.135 - Guarantees and credit derivatives: double default treatment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 2 2014-01-01 2014-01-01 false Guarantees and credit derivatives: double... § 217.135 Guarantees and credit derivatives: double default treatment. (a) Eligibility and operational criteria for double default treatment. A Board-regulated institution may recognize the credit...

  17. 12 CFR 3.135 - Guarantees and credit derivatives: double default treatment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 1 2014-01-01 2014-01-01 false Guarantees and credit derivatives: double... Approaches Risk-Weighted Assets for General Credit Risk § 3.135 Guarantees and credit derivatives: double default treatment. (a) Eligibility and operational criteria for double default treatment. A national...

  18. 10 CFR 205.287 - Escrow accounts, segregated funds and other guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Escrow accounts, segregated funds and other guarantees. 205.287 Section 205.287 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Special Procedures for Distribution of Refunds § 205.287 Escrow accounts, segregated funds and other guarantees. (a) In implementing the refund...

  19. 10 CFR 205.287 - Escrow accounts, segregated funds and other guarantees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Escrow accounts, segregated funds and other guarantees. 205.287 Section 205.287 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS... sufficient bond or other guarantee to ensure payment. (b) All costs and charges approved by the Office...

  20. 40 CFR 280.115 - Replenishment of guarantees, letters of credit, or surety bonds.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., local government guarantee with standby trust, letter of credit, or surety bond, and the amount in the... of credit, or surety bonds. 280.115 Section 280.115 Protection of Environment ENVIRONMENTAL... Replenishment of guarantees, letters of credit, or surety bonds. (a) If at any time after a standby trust...

  1. 22 CFR 232.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Non-impairment of the Guarantee. 232.05 Section 232.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REPUBLIC OF TUNISIA LOAN GUARANTEES ISSUED UNDER THE DEPARTMENT OF STATE, FOREIGN OPERATIONS, AND RELATED PROGRAMS APPROPRIATIONS ACT,...

  2. 49 CFR 260.45 - Events of default for guaranteed loans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Events of default for guaranteed loans. 260.45... REHABILITATION AND IMPROVEMENT FINANCING PROGRAM Procedures To Be Followed in the Event of Default § 260.45 Events of default for guaranteed loans. (a) If the Borrower is more than 30 days past due on a payment...

  3. 49 CFR 260.45 - Events of default for guaranteed loans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Events of default for guaranteed loans. 260.45... REHABILITATION AND IMPROVEMENT FINANCING PROGRAM Procedures To Be Followed in the Event of Default § 260.45 Events of default for guaranteed loans. (a) If the Borrower is more than 30 days past due on a payment...

  4. 49 CFR 260.45 - Events of default for guaranteed loans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Events of default for guaranteed loans. 260.45... REHABILITATION AND IMPROVEMENT FINANCING PROGRAM Procedures To Be Followed in the Event of Default § 260.45 Events of default for guaranteed loans. (a) If the Borrower is more than 30 days past due on a payment...

  5. 22 CFR 231.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Non-impairment of the Guarantee. 231.05 Section 231.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW...

  6. 22 CFR 231.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Non-impairment of the Guarantee. 231.05 Section 231.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW...

  7. 22 CFR 231.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Non-impairment of the Guarantee. 231.05 Section 231.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW...

  8. 22 CFR 231.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Non-impairment of the Guarantee. 231.05 Section 231.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW...

  9. 22 CFR 231.05 - Non-impairment of the Guarantee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Non-impairment of the Guarantee. 231.05 Section 231.05 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ARAB REPUBLIC OF EGYPT LOAN GUARANTEES ISSUED UNDER THE EMERGENCY WARTIME SUPPLEMENTAL APPROPRIATIONS ACT OF 2003, PUBLIC LAW...

  10. Guaranteed Student Loans. Comparisons of Single State and Multistate Guaranty Agencies. Report to Congressional Committees.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Div. of Human Resources.

    A comparison was made of the practices of so-called multistate guaranty agencies with those of single state guaranty agencies, both operating under the provisions of the Stafford Student Loan Program (formerly the Guaranteed Student Loan Program). It expands on earlier results and provides data on trends in the growth of guaranteed loans and…

  11. Training Guarantee: A Levy To Improve the Quality of Australian Workforce.

    ERIC Educational Resources Information Center

    Navaratnam, K. K.

    The Training Guarantee Act (TGA) passed by the Federal Parliament of Australia in 1990 establishes a training guarantee scheme. It requires employers to invest in high quality, employment-related training that will most benefit their businesses. The levy is having an impact on many facets of human resource development in Australia. In seeking to…

  12. 34 CFR 682.513 - Factors affecting coverage of a loan under the loan guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Factors affecting coverage of a loan under the loan guarantee. 682.513 Section 682.513 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Federal Guaranteed Student...

  13. Robust reliable guaranteed cost control of positive interval systems with multiple time delays and actuator failure

    NASA Astrophysics Data System (ADS)

    Zhang, Ji-Shi; Wang, Yan-Wu; Xiao, Jiang-Wen; Chen, Yang

    2016-03-01

    This paper addresses the robust reliable guaranteed cost control problem of positive interval systems with multiple time delays and actuator failure for a given quadratic cost function. Through constructing a Lyapunov-Krasovskii functional, a sufficient condition for the existence of robust reliable guaranteed cost controllers is established such that the closed-loop system is positive and asymptotically stable, and the cost function is guaranteed to be no more than a certain upper bound. Based on the linear matrix inequality method, a criterion for the design of robust reliable guaranteed cost controllers is derived which can tolerate all admissible uncertainties as well as actuator failure. Moreover, a convex optimisation problem with linear matrix inequality constraints is formulated to design the optimal robust reliable guaranteed cost controller which minimises the upper bound of the closed-loop system cost. A numerical example is given to show the effectiveness of the proposed methods.

  14. Initiated by the south. South - South Cooperation.

    PubMed

    Parsons, J S

    1993-12-01

    The UNFPA Deputy Chief of the Asia and Pacific Division explains how relations between representatives of developing countries to the South have often been less than congenial and how efforts have been made to smooth the way for greater cooperation between neighbors in the region. President Soeharto of Indonesia at a G-15 submeeting of Non-Aligned Countries in Malaysia in 1990 made the first overtures to his peers. He offered to work more closely with other interested countries economically and in terms of technical assistance. Prime Minister Von Van Kiet of Vietnam took him up on his offer and visited the President in Indonesia in January 1992 to discuss family planning issues. The subsequent assistance rendered by Indonesia to Vietnam in developing its family planning program was unique in bilateral relations in the region in that it was initiated by the nonaligned countries without outside interference. The author thinks that the UNFPA should play a facilitating role financially and organizationally in what may be the beginning of a trend toward greater South-South cooperation. Any help which developing countries could render to other developing nations will certainly be appreciated in this period of waning resources from developed countries for international population programs. The author also argues that service quality in donor countries is likely to improve. PMID:12345389

  15. Audit Report "The Department of Energy's Loan Guarantee Program for Innovative Energy Technologies"

    SciTech Connect

    2009-02-01

    The Energy Policy Act of 2005 authorized the Department of Energy to guarantee loans for new or significantly improved energy production technologies that avoid, reduce, or sequester air pollutants and other greenhouse gases. As of December 2008, Congress authorized the Department to make $42.5 billion in loan guarantees to support innovative energy projects. These guarantees were authorized for up to 80% of the total project costs and were designed to promote the commercial use of innovative technologies. Under the terms of the Act, the loan guarantees are contingent upon reasonable prospect of repayment by the borrower. Consistent with the Energy Policy Act, the Department is responsible for soliciting and evaluating loan applications, approving loan guarantees, and monitoring project and loan guarantee performance. through December 2008, the Department had issued five solicitations for projects that support innovative clean coal technologies, energy efficiency, renewable energy, advanced electricity transmission and distribution, and nuclear and fossil energy projects. These solicitations were issued in three phases with the first in August 2006, and the final in September 2008. Eleven substantially complete applications requesting approximately $8.2 billion in loan guarantees had been received by the Department in response to the first solicitation. The Department had begun the review of applications and was in the process of completing due diligence procedures necessary to evaluate projects received in response to the first solicitation. Under current plans, the Department is to issue its first loan guarantees in the spring of 2009. Because of the importance of this program as part of an effort to address the Nation's most challenging and pressing energy needs; and, the potential risk of loss to the United States taxpayers should default occur, we initiated this review to evaluate the Department's progress in establishing internal and operational controls over

  16. 48 CFR 52.247-8 - Estimated Weights or Quantities Not Guaranteed.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., as the Government does not guarantee any particular volume of traffic described in this contract. However, to the extent services are required as described in this contract and in accordance with...

  17. 48 CFR 52.247-8 - Estimated Weights or Quantities Not Guaranteed.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., as the Government does not guarantee any particular volume of traffic described in this contract. However, to the extent services are required as described in this contract and in accordance with...

  18. 48 CFR 52.247-8 - Estimated Weights or Quantities Not Guaranteed.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., as the Government does not guarantee any particular volume of traffic described in this contract. However, to the extent services are required as described in this contract and in accordance with...

  19. 78 FR 76593 - Maximum Loan Amount for Business and Industry Guaranteed Loans in Fiscal Year 2014

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ... Fiscal Year 2014 AGENCY: Rural Business-Cooperative Service, USDA. ACTION: Notice. SUMMARY: Section 4279... are expected for Fiscal Year (FY) 2014 for the B&I Guaranteed Loan Program, the Administrator...

  20. 77 FR 54877 - Guaranteed Rural Rental Housing Low Loan-to-Cost Ratio

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ...: Monica Cole, Financial and Loan Analyst, USDA Rural Development Guaranteed Rural Rental Housing Program....cole@wdc.usda.gov . Telephone: (202) 720-1251. This number is not toll-free. Hearing or...

  1. A Best Practice for Developing Availability Guarantee Language in Photovoltaic (PV) O&M Agreements.

    SciTech Connect

    Klise, Geoffrey Taylor; Balfour, John

    2015-11-01

    This document outlines the foundation for developing language that can be utilized in an Equipment Availability Guarantee, typically included in an O&M services agreement between a PV system or plant owner and an O&M services provider, or operator. Many of the current PV O&M service agreement Availability Guarantees are based on contracts used for traditional power generation, which create challenges for owners and operators due to the variable nature of grid-tied photovoltaic generating technologies. This report documents language used in early PV availability guarantees and presents best practices and equations that can be used to more openly communicate how the reliability of the PV system and plant equipment can be expressed in an availability guarantee. This work will improve the bankability of PV systems by providing greater transparency into the equipment reliability state to all parties involved in an O&M services contract.

  2. 7 CFR 1738.30 - Rural broadband access loans and loan guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... includes commercial banks, trust companies, mortgage banking firms, insurance companies, and any other... be, will neither be paid first nor given any preference or priority over the Guaranteed Loan...

  3. 27 CFR 19.154 - Bond guaranteed by deposit of securities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... may be found at http://www.publicdebt.treas.gov. (31 U.S.C. 9301, 9303; 31 CFR part 380) ... Surety Bonding Requirements for A Dsp § 19.154 Bond guaranteed by deposit of securities. (a) General....

  4. 27 CFR 19.154 - Bond guaranteed by deposit of securities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... may be found at http://www.publicdebt.treas.gov. (31 U.S.C. 9301, 9303; 31 CFR part 380) ... Surety Bonding Requirements for A Dsp § 19.154 Bond guaranteed by deposit of securities. (a) General....

  5. 27 CFR 19.154 - Bond guaranteed by deposit of securities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... may be found at http://www.publicdebt.treas.gov. (31 U.S.C. 9301, 9303; 31 CFR part 380) ... Surety Bonding Requirements for A Dsp § 19.154 Bond guaranteed by deposit of securities. (a) General....

  6. 7 CFR 762.130 - Loan approval and issuing the guarantee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... this time frame is not met, the proposed guaranteed loan will automatically be approved, subject to... compensation, and personal life insurance (when required) are in effect; (iii) Truth in lending...

  7. 77 FR 51023 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... UNITED STATES Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of... an application for final ] commitment for a long-term loan or financial guarantee in excess of $100... received an application for final commitment for a long-term loan or financial guarantee in excess of...

  8. 77 FR 51023 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... UNITED STATES Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of... regarding an application for final commitment for a long-term loan or financial guarantee in excess of $100... received an application for final commitment for a long-term loan or financial guarantee in excess of...

  9. 24 CFR 1000.402 - Are State recognized Indian tribes eligible for guarantees under title VI of NAHASDA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... eligible for guarantees under title VI of NAHASDA? 1000.402 Section 1000.402 Housing and Urban Development... for guarantees under title VI of NAHASDA? Those State recognized Indian tribes that meet the definition set forth in section 4(12)(C) of NAHASDA are eligible for guarantees under title VI of NAHASDA....

  10. 24 CFR 1000.424 - What are the application requirements for guarantee assistance under title VI of NAHASDA?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false What are the application requirements for guarantee assistance under title VI of NAHASDA? 1000.424 Section 1000.424 Housing and Urban... requirements for guarantee assistance under title VI of NAHASDA? The application for a guarantee must...

  11. 24 CFR 1000.402 - Are State recognized Indian tribes eligible for guarantees under title VI of NAHASDA?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... eligible for guarantees under title VI of NAHASDA? 1000.402 Section 1000.402 Housing and Urban Development... for guarantees under title VI of NAHASDA? Those State recognized Indian tribes that meet the definition set forth in section 4(12)(C) of NAHASDA are eligible for guarantees under title VI of NAHASDA....

  12. 24 CFR 1000.424 - What are the application requirements for guarantee assistance under title VI of NAHASDA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What are the application requirements for guarantee assistance under title VI of NAHASDA? 1000.424 Section 1000.424 Housing and Urban... requirements for guarantee assistance under title VI of NAHASDA? The application for a guarantee must...

  13. 24 CFR 1000.402 - Are State recognized Indian tribes eligible for guarantees under title VI of NAHASDA?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... eligible for guarantees under title VI of NAHASDA? 1000.402 Section 1000.402 Housing and Urban Development... for guarantees under title VI of NAHASDA? Those State recognized Indian tribes that meet the definition set forth in section 4(12)(C) of NAHASDA are eligible for guarantees under title VI of NAHASDA....

  14. 24 CFR 1000.424 - What are the application requirements for guarantee assistance under title VI of NAHASDA?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false What are the application requirements for guarantee assistance under title VI of NAHASDA? 1000.424 Section 1000.424 Housing and Urban... requirements for guarantee assistance under title VI of NAHASDA? The application for a guarantee must...

  15. 24 CFR 1000.424 - What are the application requirements for guarantee assistance under title VI of NAHASDA?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false What are the application requirements for guarantee assistance under title VI of NAHASDA? 1000.424 Section 1000.424 Housing and Urban... requirements for guarantee assistance under title VI of NAHASDA? The application for a guarantee must...

  16. 24 CFR 1000.402 - Are State recognized Indian tribes eligible for guarantees under title VI of NAHASDA?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... eligible for guarantees under title VI of NAHASDA? 1000.402 Section 1000.402 Housing and Urban Development... for guarantees under title VI of NAHASDA? Those State recognized Indian tribes that meet the definition set forth in section 4(12)(C) of NAHASDA are eligible for guarantees under title VI of NAHASDA....

  17. 24 CFR 1000.402 - Are State recognized Indian tribes eligible for guarantees under title VI of NAHASDA?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... eligible for guarantees under title VI of NAHASDA? 1000.402 Section 1000.402 Housing and Urban Development... for guarantees under title VI of NAHASDA? Those State recognized Indian tribes that meet the definition set forth in section 4(12)(C) of NAHASDA are eligible for guarantees under title VI of NAHASDA....

  18. 24 CFR 1000.424 - What are the application requirements for guarantee assistance under title VI of NAHASDA?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false What are the application requirements for guarantee assistance under title VI of NAHASDA? 1000.424 Section 1000.424 Housing and Urban... requirements for guarantee assistance under title VI of NAHASDA? The application for a guarantee must...

  19. 77 FR 52026 - Application for Final Commitment for a Long-term Loan or Financial Guarantee in Excess of $100...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... UNITED STATES Application for Final Commitment for a Long-term Loan or Financial Guarantee in Excess of... regarding an application for final commitment for a long-term loan or financial guarantee in excess of $100... application for final commitment for a long-term loan or financial guarantee in excess of $100 million...

  20. 77 FR 58139 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million; 25 Day... regarding an application for final commitment for a long-term loan or financial guarantee in excess of $100... received an application for final commitment for a long-term loan or financial guarantee in excess of...