Science.gov

Sample records for iii program scheduling

  1. Schedule-Organizer Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Organizer provides simple method for generating distribution lists. Contains readers' names for each task schedule defined by input files. Schedule Organizer (SO), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  2. Schedule-Tracker Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Tracker provides effective method for tracking tasks "past due" and/or "near term". Generates reports for each responsible staff member having one or more assigned tasks falling within two listed categories. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  3. SO - SCHEDULE ORGANIZER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer SO, Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. SO contains the following primary menu that is displayed at the beginning of the program. The menu provides options: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds twenty-five groups of up to twenty-five names for each group. The other file holds twenty-five records, each of which may hold a task schedule title. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout; there is one for each input names file schedule group. The third output file holds the last schedule title deleted by

  4. Schedules of controlled substances: rescheduling of buprenorphine from schedule V to schedule III. Final rule.

    PubMed

    2002-10-01

    This final rule is issued by the Deputy Administrator of the Drug Enforcement Administration (DEA) to reschedule buprenorphine from a Schedule V narcotic to a Schedule III narcotic under the Controlled Substances Act (CSA). This action is based on a rescheduling recommendation by the Department of Health and Human Services (DHHS) and a DEA review indicating that buprenorphine meets the criteria of a Schedule III narcotic. The DEA published a proposed rule to reschedule buprenorphine on March 21, 2002 (67 FR 13114). The comment period was extended for an additional 30 days until May 22, 2002 (67 FR 20072). The DEA received ten comments but no requests for hearings. This final action will impose the regulatory controls and criminal sanctions of a Schedule III narcotic on those persons who handle buprenorphine or products containing buprenorphine PMID:12369590

  5. ST - SCHEDULE TRACKER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST, and Schedule Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum numbers can be modified by the user. ST requires the VMS Operating System on DEC VAX and was written in PL/1 and DEC Command Language (DCL). The program requires a memory of 233KB. ST can be purchased separately or in a package (COSMIC Program COS-10021) containing SO, ST, and SRG. ST was developed in 1985.

  6. S-CHART - SCHEDULING CHART PROGRAM

    NASA Technical Reports Server (NTRS)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  7. Schedule-Report-Generator Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Report Generator provides simple method for generating periodic schedule reports. Enables engineering manager to monitor tasks assigned to staff members on weekly basis. Sorts three types of reports by use of one or more data fields as sorting keys. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  8. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  9. 78 FR 62500 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... action is based on a recommendation from the Assistant Secretary for Health of the Department of Health... classified into one of five schedules based upon their potential for abuse, their currently accepted medical... (Schedule III). According to the HHS, based on results from the clinical study with recreational drug...

  10. Schedules of controlled substances: rescheduling of hydrocodone combination products from schedule III to schedule II. Final rule.

    PubMed

    2014-08-22

    With the issuance of this final rule, the Administrator of the Drug Enforcement Administration reschedules hydrocodone combination products from schedule III to schedule II of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule II controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, conduct chemical analysis with, or possess) or propose to handle hydrocodone combination products. PMID:25167591

  11. 77 FR 60743 - Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Internal Revenue Service Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040... Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Schedule F... Number: Schedule F, Part II and III (Form 1040). Abstract: Schedule F, Part II and III (Form 1040)...

  12. Resupply Scheduler Program Using Integer Optimization

    NASA Technical Reports Server (NTRS)

    Viterna, L. A.; Reed, D. M.

    1994-01-01

    Resupply Scheduling Modeler (RSM) fully menu-driven computer program using integer programming techniques to determine optimum schedule for replacing components on or before ends of fixed replacement periods. Written to analyze electrical power system on Space Station Freedom, also used to model resupply of almost any system subject to user-defined constraints on resources. Lifetimes of components, assembly schedules, and other constraints taken into account. Written in APL2(R).

  13. 78 FR 72013 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... the CSA, with the concurrence of NIDA. 50 FR 9518, Mar. 8, 1995. In addition, because the Secretary of... Perampanel into Schedule III'' on October 22, 2013 (78 FR 62500), which proposed placement of perampanel in... partial-onset seizures with or without secondarily generalized seizures in patients with epilepsy aged...

  14. Schedules of controlled substances: placement of perampanel into Schedule III. Final rule.

    PubMed

    2013-12-01

    With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration (DEA) places the substance perampanel [2-(2-oxo-1-phenyl-5-pyridin-2-yl-1,2-dihydropyridin-3-yl) benzonitrile], including its salts, isomers, and salts of isomers, into schedule III of the Controlled Substances Act (CSA). This scheduling action is pursuant to the CSA which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule III controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, or possess) or propose to handle perampanel. PMID:24294637

  15. SO/ST/SRG - SCHEDULING PROGRAMS

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Organizer contains a primary menu that is displayed at the beginning of the program. The menu provides options as follows: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds 25 groups of up to 25 names for each group. The other file holds 25 records. Each 60-character-long record holds a task schedule title or it is a blank entry. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout. There is one for each input names file schedule group. The third output file holds the schedule title of the last schedule title file deleted by the user. Schedule Tracker provides an effective method for tracking tasks that are "past due" and/or "near term". ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term

  16. Adapting Scheduling Programs for Educational Specifications.

    ERIC Educational Resources Information Center

    Glass, Thomas E.

    1984-01-01

    Planners of a new Arizona school used the district's existing computerized master scheduling program to identify instructional spaces needed. Total classroom needs by subject were translated into total square footage requirements. (MLF)

  17. SRG - SCHEDULE REPORT GENERATOR COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Schedule Report Generator, SRG, are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are schedule for recent completion (near term). Schedule Reports Generator provides a simple method for generating periodic schedule reports. SRG enables an engineering manager to monitor tasks assigned to staff members on a weekly basis. SRG sorts three types of reports using one or more data fields as sort keys. One type is sorted using the calendar year as the primary key and the end date as the secondary key. Another type is sorted by flight number. A third type of report, Waterfall plots, is also generated by SRG using the end date as the sorting key. SRG requires as input a single file or two concatenated files with up to 400 single line entries. The user constructs the input file by using the LSE editor VAX utility prior to the execution of the program. The user is able to modify the current functional description text lines just displayed. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum

  18. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  19. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  20. Long term fuel scheduling linear programming

    SciTech Connect

    Asgarpoor, S. . Dept. of Electrical Engineering); Gul, N. )

    1992-01-01

    This paper presents an application of linear programming (LP) revised simplex method in order to solve the fuel scheduling problem. A regression method is applied to determine the polynomial cost curves, and a separable programming technique is used to linearize the objective function and the constraints for LP application. Results based on sample data obtained from Omaha Public Power District (OPPD) are presented to demonstrate the LP application to this problem.

  1. Runway Scheduling Using Generalized Dynamic Programming

    NASA Technical Reports Server (NTRS)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  2. 75 FR 67054 - Listing of Approved Drug Products Containing Dronabinol in Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ...\\ 51 FR 17476 (May 13, 1986). DEA subsequently transferred the FDA-approved Marinol formulation from schedule II to schedule III. 64 FR 35928 (July 2, 1999). Recently, firms have submitted to FDA ANDAs for... Health and Human Services (DHHS) with requests for scientific and medical evaluation and...

  3. On program restructuring, scheduling, and communication for parallel processor systems

    SciTech Connect

    Polychronopoulos, Constantine D.

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, these algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented. 69 refs., 74 figs., 14 tabs.

  4. 76 FR 5830 - FBI Records Management Division; National Name Check Program Section; New User Fees Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... Federal Bureau of Investigation FBI Records Management Division; National Name Check Program Section; New User Fees Schedule AGENCY: Federal Bureau of Investigation (FBI), Justice. ACTION: Notice. SUMMARY... effective on March 4, 2011. Dated: January 25, 2011. Robert S. Mueller, III, Director, Federal Bureau...

  5. Master schedule for CY-1981 Hanford environmental surveillance routine program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites. (JGB)

  6. Application of fuzzy linear programming to maintenance scheduling

    SciTech Connect

    Noor, S.F.; McDonald, J.R.

    1995-10-01

    In this paper initially, methods of fuzzy linear programming are discussed, which is then followed by an explanation of fuzzy 0-1 programming and finally the authors show how this method is applied to maintenance scheduling of a series of generators. Fuzzy linear 0-1 programming may be used for maintenance scheduling of generating units, this makes it possible to represent some of the maintenance constraints in flexible form and hence better suited to the requirements of maintenance personnel.

  7. An Assessment of a Senior High School Modular Scheduling Program.

    ERIC Educational Resources Information Center

    Hicken, James E.

    Modular scheduling was introduced in the academic year 1967-68 at North Miami Senior High School. After a year's operation under the Stanford School Scheduling System, an "at home" evaluation of the new program was made. Student grades on a cross-sectional basis did not suffer, but rather showed a slight improvement. Moderate improvement was also…

  8. Master schedule for CY-1982 Hanford environmental surveillance routine program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites. (ATT)

  9. International Space Programs. Aerospace Education III.

    ERIC Educational Resources Information Center

    Bulmer, S. B.

    This book, one in the series on Aerospace Education III, is a collection of the diverse information available regarding the international space programs. The five goals listed for the book are: to examine the Soviet space program, to understand the future of Soviet space activity, to examine other national and international space programs, to…

  10. 33 CFR Schedule III to Subpart A... - Calling-in Table

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Schedule III to Subpart A of Part 401—Calling-in Table C.I.P. and checkpoint Station to call Message... to Subpart A of Part 401 Navigation and Navigable Waters SAINT LAWRENCE SEAWAY DEVELOPMENT... 1. Name of vessel.2. Location. 3. ETA Cape Vincent or River Port. 15. Whale back Shoal—Con...

  11. Scheduling IT staff at a bank: a mathematical programming approach.

    PubMed

    Labidi, M; Mrad, M; Gharbi, A; Louly, M A

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  12. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    PubMed Central

    Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  13. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  14. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  15. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  16. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  17. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  18. The Berkeley SETI Program: SERENDIP III

    NASA Astrophysics Data System (ADS)

    Donnelly, C.; Bowyer, S.; Werthimer, D.; Ng, D.; Cobb, J.

    1993-05-01

    The Berkeley SETI (Search for Extraterrestrial Intelligence) program, named SERENDIP, was begun in the late 1970's. It is aimed at detecting narrow band radio signals from extraterrestrial civilizations. The SERENDIP I, II and III systems have operated autonomously in a piggyback search mode, conducting unobtrusive, long-term observations on the world's largest radio telescopes. The latest generation SERENDIP instrument, SERENDIP III, is a four million channel FFT-based spectrum analyzer operating at 0.6 Hz resolution with a 1.7 second integration time. SERENDIP III has been operating at the NAIC Arecibo Observatory since April, 1992. Several independent criteria suggest that this search is the most sensitive SETI search in operation. To date SERENDIP III has accumulated over 3600 hours of high quality telescope time, observing 75% of the sky visible by the Arecibo telescope. Over this period SERENDIP III has analyzed over 30 trillion spectral bins, and recorded information on 110 million strong narrow band signals in the 424--435 MHz band. A handful of these signals have survived our RFI rejection and signal detection algorithms, and have thus been added to our list of ETI candidate signals. A follow-up observation program will be conducted next year in an attempt to verify each of these candidate signals. This work has been supported by NASA grant NAGW-2722.

  19. TRU Waste Management Program cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A. . Joint Integration Office); Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A. Corp., Boulder, CO )

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementation would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)

  20. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    SciTech Connect

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  1. A Mixed Integer Linear Program for Airport Departure Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Jung, Yoon Chul

    2009-01-01

    Aircraft departing from an airport are subject to numerous constraints while scheduling departure times. These constraints include wake-separation constraints for successive departures, miles-in-trail separation for aircraft bound for the same departure fixes, and time-window or prioritization constraints for individual flights. Besides these, emissions as well as increased fuel consumption due to inefficient scheduling need to be included. Addressing all the above constraints in a single framework while allowing for resequencing of the aircraft using runway queues is critical to the implementation of the Next Generation Air Transport System (NextGen) concepts. Prior work on airport departure scheduling has addressed some of the above. However, existing methods use pre-determined runway queues, and schedule aircraft from these departure queues. The source of such pre-determined queues is not explicit, and could potentially be a subjective controller input. Determining runway queues and scheduling within the same framework would potentially result in better scheduling. This paper presents a mixed integer linear program (MILP) for the departure-scheduling problem. The program takes as input the incoming sequence of aircraft for departure from a runway, along with their earliest departure times and an optional prioritization scheme based on time-window of departure for each aircraft. The program then assigns these aircraft to the available departure queues and schedules departure times, explicitly considering wake separation and departure fix restrictions to minimize total delay for all aircraft. The approach is generalized and can be used in a variety of situations, and allows for aircraft prioritization based on operational as well as environmental considerations. We present the MILP in the paper, along with benefits over the first-come-first-serve (FCFS) scheme for numerous randomized problems based on real-world settings. The MILP results in substantially reduced

  2. Program partitioning and scheduling for NUMA computer architectures

    SciTech Connect

    Wolski, R.M.

    1994-03-01

    To effect the parallel execution of a program on a multiprocessor, each of the program`s constituent computations must be assigned to a processing resource within the multiprocessor. The problem of making this assignment so that execution time is minimized (known as the mapping problem) has been shown to be NP-complete. However, heuristics based on the performance characteristics of the target multiprocessor can yield execution times that approach the minimum possible. The mapping problem can be divided in to the problem of partitioning the computations into sequential threads, and the problem of scheduling those threads on the processors of the target system. This dissertation presents a logical framework and a set of heuristics that operate within the framework for the automatic partitioning and scheduling of programs at compile-time. The framework is based on the memory-node execution model which correctly captures the interaction between computations, processors, and the communication resources within a multiprocessor. The CP and HEF heuristics manipulate the features of the memory-node model to produce efficient program mappings. The effectiveness of the partitioning and scheduling techniques is investigated for Non-uniform Memory Access (NUMA) architecture types. To test the versatility of the approach, results are presented both for processors implementing strict execution semantics, and non-strict load/store semantics popular with RISC systems. The partitioner and scheduler are also used to investigate the possible advantages of multithreading (using either hardware or software), and the effectiveness of massively parallel systems, within a scientific programming context.

  3. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  4. Schedule Optimization Study, Hanford RI/FS Program

    SciTech Connect

    Not Available

    1992-12-01

    A Schedule Optimization Study (SOS) of the US Department of Energy (DOE) Hanford Site Remedial Investigation/Feasibility Study (RI/FS) Program was conducted by an independent team of professionals from other federal agencies and the private sector experienced in environmental restoration. This team spent two weeks at Hanford in September 1992 examining the reasons for the lengthy RI/FS process at Hanford and developing recommendations to expedite the process. The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit RI/FS Work Plan. This report documents the study called for in the August 29, 1991, Dispute Resolution Committee Decision Statement. Battelle's Environmental Management Operations (EMO) coordinated the effort for DOE's Richland Field Office (RL).

  5. Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles H.

    2012-01-01

    We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

  6. A new mathematical programming model for scheduling flexible manufacturing systems

    SciTech Connect

    MacCarthy, B.; Liu, J.

    1994-12-31

    Flexibility is now a major consideration in the design of many manufacturing systems. Flexible manufacturing systems (FMS) have been developed in the last two decades. The principal elements of an FMS are (1) computer controlled machine tools, (2) a transport system and (3) a host computer system. Such systems may combine high flexibility with high productivity and may allow unsupervised production. However, in order to achieve these benefits, the control system must be capable of exercising intelligent supervisory management. Scheduling is at the heart of the control system and is still a major problem area. This paper describes a new mathematical programming model for a wide class of FMS scheduling problems based on a new classification scheme. A global optimization approach is adopted based on a mixed-integer linear programming model. Many important aspects of operational FMS, omitted form earlier models, are included. Key elements of model structure are highlighted. Computational experience with a comprehensive set of designed experiments is described. The applications of the model are noted and the development of effective heuristic procedures based on the model is highlighted.

  7. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  8. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  9. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  10. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  11. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  12. Advanced Emissions Control Development Program: Phase III

    SciTech Connect

    G.T. Amrhein; R.T. Bailey; W. Downs; M.J. Holmes; G.A. Kudlac; D.A. Madden

    1999-07-01

    The primary objective of the Advanced Emissions Control Development Program (AECDP) is to develop practical, cost-effective strategies for reducing the emissions of air toxics from coal-fired boilers. The project goal is to effectively control air toxic emissions through the use of conventional flue gas clean-up equipment such as electrostatic precipitators (ESPs), fabric filters (baghouses - BH), and wet flue gas desulfurization systems (WFGD). Development work concentrated on the capture of trace metals, fine particulate, hydrogen chloride and hydrogen fluoride, with an emphasis on the control of mercury. The AECDP project is jointly funded by the US Department of Energy's Federal Energy Technology Center (DOE), the Ohio Coal Development Office within the Ohio Department of Development (OCDO), and Babcock and Wilcox, a McDermott company (B and W). This report discusses results of all three phases of the AECDP project with an emphasis on Phase III activities. Following the construction and evaluation of a representative air toxics test facility in Phase I, Phase II focused on characterization of the emissions of mercury and other air toxics and the control of these emissions for typical operating conditions of conventional flue gas clean-up equipment. Some general comments that can be made about the control of air toxics while burning a high-sulfur bituminous coal are as follows: (1) particulate control devices such as ESP's and baghouses do a good job of removing non-volatile trace metals, (2) particulate control devices (ESPs and baghouses) effectively remove the particulate-phase mercury, but the particulate-phase mercury was only a small fraction of the total for the coals tested, (3) wet scrubbing can effectively remove hydrogen chloride and hydrogen fluoride, and (4) wet scrubbers show good potential for the removal of mercury when operated under certain conditions, however, for certain applications, system enhancements can be required to achieve high

  13. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results.

  14. Santa Fe Bilingual-Bicultural Education Program. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Ludanyi, R. P.; Ehrlich, Roselin

    This content analysis schedule for the Santa Fe Bilingual-Bicultural Education Program of Santa Fe, New Mexico, presents information on the history, funding, and scope of the project in its second year. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is…

  15. Mixed Integer Programming and Heuristic Scheduling for Space Communication

    NASA Technical Reports Server (NTRS)

    Lee, Charles H.; Cheung, Kar-Ming

    2013-01-01

    Optimal planning and scheduling for a communication network was created where the nodes within the network are communicating at the highest possible rates while meeting the mission requirements and operational constraints. The planning and scheduling problem was formulated in the framework of Mixed Integer Programming (MIP) to introduce a special penalty function to convert the MIP problem into a continuous optimization problem, and to solve the constrained optimization problem using heuristic optimization. The communication network consists of space and ground assets with the link dynamics between any two assets varying with respect to time, distance, and telecom configurations. One asset could be communicating with another at very high data rates at one time, and at other times, communication is impossible, as the asset could be inaccessible from the network due to planetary occultation. Based on the network's geometric dynamics and link capabilities, the start time, end time, and link configuration of each view period are selected to maximize the communication efficiency within the network. Mathematical formulations for the constrained mixed integer optimization problem were derived, and efficient analytical and numerical techniques were developed to find the optimal solution. By setting up the problem using MIP, the search space for the optimization problem is reduced significantly, thereby speeding up the solution process. The ratio of the dimension of the traditional method over the proposed formulation is approximately an order N (single) to 2*N (arraying), where N is the number of receiving antennas of a node. By introducing a special penalty function, the MIP problem with non-differentiable cost function and nonlinear constraints can be converted into a continuous variable problem, whose solution is possible.

  16. Quarterly report on program cost and schedule, third quarter FY 1992

    SciTech Connect

    1992-10-01

    This report is intended to provide a summary of the cost and schedule performance for the civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from the DOE Financial information System) are presented for each of the major program elements. Also included in this report are the program schedule baseline, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through June 1992.

  17. GA-based discrete dynamic programming approach for scheduling in FMS environments.

    PubMed

    Yang, J B

    2001-01-01

    The paper presents a new genetic algorithm (GA)-based discrete dynamic programming (DDP) approach for generating static schedules in a flexible manufacturing system (FMS) environment. This GA-DDP approach adopts a sequence-dependent schedule generation strategy, where a GA is employed to generate feasible job sequences and a series of discrete dynamic programs are constructed to generate legal schedules for a given sequence of jobs. In formulating the GA, different performance criteria could be easily included. The developed DDF algorithm is capable of identifying locally optimized partial schedules and shares the computation efficiency of dynamic programming. The algorithm is designed In such a way that it does not suffer from the state explosion problem inherent in pure dynamic programming approaches in FMS scheduling. Numerical examples are reported to illustrate the approach. PMID:18244848

  18. DOTSYS III: A Portable Program for Braille Translation. Rev. 1.

    ERIC Educational Resources Information Center

    Sullivan, Joseph E., Ed.; And Others

    DOTSYS III is a COBOL program for the translation of English text into standard English braille, also known as grade 2 braille. Text in foreign languages or English may be transliterated as grade 1 braille or "computer" braille. The program's method of operation together with instructions on using the program, modifying or extending the…

  19. Community College Exemplary Instructional Programs, Volume III.

    ERIC Educational Resources Information Center

    Fideler, Elizabeth F., Ed.; Bazer, Gerald, Ed.

    Third in an annual series, this volume presents brief descriptions of a number of outstanding community college instructional programs identified by the National Council of Instructional Administrators (NCIA). Each description includes the address and telephone number of the college in which the program operates, and the names of the college…

  20. Human Development Program: Level III Activity Guide.

    ERIC Educational Resources Information Center

    Bessell, Harold

    The curriculum guide presents the activities component of the Human Development Program for the third grade. The Human Development Program (HDP) is an affective curricular approach developed by psychologists to help teachers instill responsibility and self-confidence in children. Following a brief overview of the HDP and explanation of the Magic…

  1. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    ERIC Educational Resources Information Center

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic background of…

  2. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes.

  3. Interdisciplinary Studies Program. Teacher's Guide: Part III.

    ERIC Educational Resources Information Center

    Valencia Community Coll., Orlando, FL.

    This teacher's guide was developed for the third of four courses in Valencia Community College's Interdisciplinary Studies program, a 2-year core general education curriculum which chronologically examines the major developments in the evolution of human knowledge. The guide provides an introductory overview of the course's topic (i.e., Western…

  4. Environmental Technology Verification (ETV) Program Case Studies: Demonstrating Program Outcomes, Volume III

    EPA Science Inventory

    This booklet, ETV Program Case Studies: Demonstrating Program Outcomes, Volume III contains two case studies, addressing verified environmental technologies for decentalized wastewater treatment and converting animal waste to energy. Each case study contains a brief description ...

  5. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  6. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    SciTech Connect

    Not Available

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  7. Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

    NASA Technical Reports Server (NTRS)

    Bonine, Lauren

    2015-01-01

    The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

  8. Quarterly report on program cost and schedule, second quarter FY 1990

    SciTech Connect

    1990-08-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical and current cost profiles are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through March 1990. 1 fig.

  9. Students in Cohort Programs and Intensive Schedule Classes: Does Familiarity Breed Differences? ASHE Annual Meeting Paper.

    ERIC Educational Resources Information Center

    Reynolds, Katherine C.

    Changing student demographics in higher education, especially increased numbers of older and/or working students, have inspired experimentation with a variety of class scheduling and degree program formats. This study investigated two such formats: (1) cohort programs (requiring students to take all or nearly all courses together toward a degree)…

  10. A model for estimating the cost impact of schedule perturbations on aerospace research and development programs

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1972-01-01

    The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.

  11. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  12. DUAL ALKALI TEST AND EVALUATION PROGRAM. VOLUME III. PROTOTYPE TEST PROGRAM--PLANT SCHOLZ

    EPA Science Inventory

    Volume III of the report covers Task III of a three-task program to investigate, characterize, and evaluate the basic process chemistry and the various operating modes of sodium-based dual alkali scrubbing processes. The tasks were: (I) laboratory studies at both Arthur D. Little...

  13. Programmed schedule holds for improving launch vehicle holds

    NASA Technical Reports Server (NTRS)

    Gralow, F. H.; Hayes, J. D.; Streiff, M. A.; Temple, A. G.; Venditti, R. A.

    1969-01-01

    Baseline definition and system optimization are used for the analysis of programmed holds developed through prelaunch system analysis. Identification of design specifications for ground support equipment and maintenance concepts, and design specifications are used to describe the functional utilization of the overall flow process.

  14. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 2 2014-01-01 2014-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  15. Creation of the selection list for the Experiment Scheduling Program (ESP)

    NASA Technical Reports Server (NTRS)

    Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.

    1986-01-01

    The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.

  16. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  17. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  18. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  19. Automatic programming via iterated local search for dynamic job shop scheduling.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism. PMID:24802623

  20. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program.

  1. 78 FR 41785 - Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program... notice will be considered public records. Title of Collection: Implementation of Title I/II Program... Estimated Number of Annual Burden Hours: 6,573. Abstract: The Implementation of Title I/II...

  2. Fair Energy Scheduling for Vehicle-to-Grid Networks Using Adaptive Dynamic Programming.

    PubMed

    Xie, Shengli; Zhong, Weifeng; Xie, Kan; Yu, Rong; Zhang, Yan

    2016-08-01

    Research on the smart grid is being given enormous supports worldwide due to its great significance in solving environmental and energy crises. Electric vehicles (EVs), which are powered by clean energy, are adopted increasingly year by year. It is predictable that the huge charge load caused by high EV penetration will have a considerable impact on the reliability of the smart grid. Therefore, fair energy scheduling for EV charge and discharge is proposed in this paper. By using the vehicle-to-grid technology, the scheduler controls the electricity loads of EVs considering fairness in the residential distribution network. We propose contribution-based fairness, in which EVs with high contributions have high priorities to obtain charge energy. The contribution value is defined by both the charge/discharge energy and the timing of the action. EVs can achieve higher contribution values when discharging during the load peak hours. However, charging during this time will decrease the contribution values seriously. We formulate the fair energy scheduling problem as an infinite-horizon Markov decision process. The methodology of adaptive dynamic programming is employed to maximize the long-term fairness by processing online network training. The numerical results illustrate that the proposed EV energy scheduling is able to mitigate and flatten the peak load in the distribution network. Furthermore, contribution-based fairness achieves a fast recovery of EV batteries that have deeply discharged and guarantee fairness in the full charge time of all EVs. PMID:26930694

  3. The JUPITER-III Program: ANL analysis of ZPPR-17

    SciTech Connect

    Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.; Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.

    1989-01-31

    The ZPPR-17 assembly was part of the JUPITER-III cooperative program between the US DOE and PNC of Japan. The assembly was designed to study the neutronic behavior of a large, axially heterogeneous, liquid-metal-cooled reactor. The unique feature of the assembly was an internal blanket region in the axial center of the core extending two-thirds of the core radius. Assembly variants with 25 control rod positions and with 13 half-inserted control rods were built. This report describes in detail the results of measurements and analyses of ZPPR-17. The measurements emphasized reaction rate distributions, and gamma dose measurements were included. Additional measurements were control worth, sodium void worth, and reactivity coefficients associated with small material motions in assembly expansion and bowing.

  4. Schedule Optimization Study, Hanford RI/FS Program. Volume 2, Final report

    SciTech Connect

    Not Available

    1992-12-01

    A Schedule Optimization Study (SOS) of the US Department of Energy (DOE) Hanford Site Remedial Investigation/Feasibility Study (RI/FS) Program was conducted by an independent team of professionals from other federal agencies and the private sector experienced in environmental restoration. This team spent two weeks at Hanford in September 1992 examining the reasons for the lengthy RI/FS process at Hanford and developing recommendations to expedite the process. The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit RI/FS Work Plan. This report documents the study called for in the August 29, 1991, Dispute Resolution Committee Decision Statement. Battelle`s Environmental Management Operations (EMO) coordinated the effort for DOE`s Richland Field Office (RL).

  5. Integrating an HTLV-III Screening Program into a Community Based Family Health Service Agency.

    ERIC Educational Resources Information Center

    Klausmeier, Walter W.; Henshaw, Beverly

    Acquired Immune Deficiency Syndrome (AIDS) has become one of the most serious epidemic disease problems in recent years. In 1985 the Public Health Service recommended establishment of test sites where individuals might be tested for Human T Lymphotropic Virus III (HTLV-III) antibody. An HTLV-III antibody screening program was integrated into a…

  6. The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.

    2004-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  7. The Swift Project Contamination Control Program: A Case study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane; Secunda, Mark

    2003-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  8. Prioritized schedule for review of industrial safety and occupational health programs

    SciTech Connect

    1996-12-01

    This document provides the rationale and criteria for developing a schedule for reviewing the Industrial Safety and Occupational Health programs for the Management and Operating Contractor (MOC) of the Waste Isolation Pilot Plant. The reviews will evaluate the MOC`s compliance with applicable Department of Energy (DOE) orders and regulatory requirements. The scope of this task includes developing prioritization criteria, determining the review priority of each program based upon the criteria, identifying review requirements for each program, and preparing a detailed review schedule. In keeping with the Carlsbad Area Office (CAO) structure for the review of site activities, these review activities will be addressed as surveillances, although the original basis for this requirement refers to these activities as appraisals. Surveillances and appraisals are the same within this document. Surveillances are defined as: ``The act of monitoring or observing to verify whether an item, activity, system, or process conforms to specified requirements. Surveillance of a technical work activity is normally done in real time, i.e., the surveillance is accomplished as the work is being performed.``

  9. Fuzzy linear programming based optimal fuel scheduling incorporating blending/transloading facilities

    SciTech Connect

    Djukanovic, M.; Babic, B.; Milosevic, B.; Sobajic, D.J.; Pao, Y.H. |

    1996-05-01

    In this paper the blending/transloading facilities are modeled using an interactive fuzzy linear programming (FLP), in order to allow the decision-maker to solve the problem of uncertainty of input information within the fuel scheduling optimization. An interactive decision-making process is formulated in which decision-maker can learn to recognize good solutions by considering all possibilities of fuzziness. The application of the fuzzy formulation is accompanied by a careful examination of the definition of fuzziness, appropriateness of the membership function and interpretation of results. The proposed concept provides a decision support system with integration-oriented features, whereby the decision-maker can learn to recognize the relative importance of factors in the specific domain of optimal fuel scheduling (OFS) problem. The formulation of a fuzzy linear programming problem to obtain a reasonable nonfuzzy solution under consideration of the ambiguity of parameters, represented by fuzzy numbers, is introduced. An additional advantage of the FLP formulation is its ability to deal with multi-objective problems.

  10. A Two-Stage Stochastic Mixed-Integer Programming Approach to the Smart House Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Ozoe, Shunsuke; Tanaka, Yoichi; Fukushima, Masao

    A “Smart House” is a highly energy-optimized house equipped with photovoltaic systems (PV systems), electric battery systems, fuel cell cogeneration systems (FC systems), electric vehicles (EVs) and so on. Smart houses are attracting much attention recently thanks to their enhanced ability to save energy by making full use of renewable energy and by achieving power grid stability despite an increased power draw for installed PV systems. Yet running a smart house's power system, with its multiple power sources and power storages, is no simple task. In this paper, we consider the problem of power scheduling for a smart house with a PV system, an FC system and an EV. We formulate the problem as a mixed integer programming problem, and then extend it to a stochastic programming problem involving recourse costs to cope with uncertain electricity demand, heat demand and PV power generation. Using our method, we seek to achieve the optimal power schedule running at the minimum expected operation cost. We present some results of numerical experiments with data on real-life demands and PV power generation to show the effectiveness of our method.

  11. A Mixed Integer Linear Program for Solving a Multiple Route Taxi Scheduling Problem

    NASA Technical Reports Server (NTRS)

    Montoya, Justin Vincent; Wood, Zachary Paul; Rathinam, Sivakumar; Malik, Waqar Ahmad

    2010-01-01

    Aircraft movements on taxiways at busy airports often create bottlenecks. This paper introduces a mixed integer linear program to solve a Multiple Route Aircraft Taxi Scheduling Problem. The outputs of the model are in the form of optimal taxi schedules, which include routing decisions for taxiing aircraft. The model extends an existing single route formulation to include routing decisions. An efficient comparison framework compares the multi-route formulation and the single route formulation. The multi-route model is exercised for east side airport surface traffic at Dallas/Fort Worth International Airport to determine if any arrival taxi time savings can be achieved by allowing arrivals to have two taxi routes: a route that crosses an active departure runway and a perimeter route that avoids the crossing. Results indicate that the multi-route formulation yields reduced arrival taxi times over the single route formulation only when a perimeter taxiway is used. In conditions where the departure aircraft are given an optimal and fixed takeoff sequence, accumulative arrival taxi time savings in the multi-route formulation can be as high as 3.6 hours more than the single route formulation. If the departure sequence is not optimal, the multi-route formulation results in less taxi time savings made over the single route formulation, but the average arrival taxi time is significantly decreased.

  12. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  13. A methodology for the evaluation of program cost and schedule risk for the SEASAT program

    NASA Technical Reports Server (NTRS)

    Abram, P.; Myers, D.

    1976-01-01

    An interactive computerized project management software package (RISKNET) is designed to analyze the effect of the risk involved in each specific activity on the results of the total SEASAT-A program. Both the time and the cost of each distinct activity can be modeled with an uncertainty interval so as to provide the project manager with not only the expected time and cost for the completion of the total program, but also with the expected range of costs corresponding to any desired level of significance. The nature of the SEASAT-A program is described. The capabilities of RISKNET and the implementation plan of a RISKNET analysis for the development of SEASAT-A are presented.

  14. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  15. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  16. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  17. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  18. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  19. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  20. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated... 10 Energy 2 2011-01-01 2011-01-01 false Physical Protection of Irradiated Reactor Fuel in...

  1. 78 FR 48995 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ...This document corrects technical errors that appeared in the final rule with comment period published in the Federal Register on November 16, 2012, entitled ``Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to-Face Encounters, Elimination of the Requirement for Termination of Non-Random Prepayment Complex Medical Review and Other Revisions to Part B......

  2. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated..., Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. D Appendix D to Part 73—Physical Protection...

  3. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated..., Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. D Appendix D to Part 73—Physical Protection...

  4. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated..., Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. D Appendix D to Part 73—Physical Protection...

  5. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated..., Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. D Appendix D to Part 73—Physical Protection...

  6. BASIC Simulation Programs; Volumes III and IV. Mathematics, Physics.

    ERIC Educational Resources Information Center

    Digital Equipment Corp., Maynard, MA.

    The computer programs presented here were developed as a part of the Huntington Computer Project. They were tested on a Digital Equipment Corporation TSS-8 time-shared computer and run in a version of BASIC. Mathematics and physics programs are presented in this volume. The 20 mathematics programs include ones which review multiplication skills;…

  7. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  8. SWOG S0221: A Phase III Trial Comparing Chemotherapy Schedules in High-Risk Early-Stage Breast Cancer

    PubMed Central

    Budd, George T.; Barlow, William E.; Moore, Halle C.F.; Hobday, Timothy J.; Stewart, James A.; Isaacs, Claudine; Salim, Muhammad; Cho, Jonathan K.; Rinn, Kristine J.; Albain, Kathy S.; Chew, Helen K.; Burton, Gary V.; Moore, Timothy D.; Srkalovic, Gordan; McGregor, Bradley A.; Flaherty, Lawrence E.; Livingston, Robert B.; Lew, Danika L.; Gralow, Julie R.; Hortobagyi, Gabriel N.

    2015-01-01

    Purpose To determine the optimal dose and schedule of anthracycline and taxane administration as adjuvant therapy for early-stage breast cancer. Patients and Methods A 2 × 2 factorial design was used to test two hypotheses: (1) that a novel continuous schedule of doxorubicin-cyclophosphamide was superior to six cycles of doxorubicin-cyclophosphamide once every 2 weeks and (2) that paclitaxel once per week was superior to six cycles of paclitaxel once every 2 weeks in patients with node-positive or high-risk node-negative early-stage breast cancer. With 3,250 patients, a disease-free survival (DFS) hazard ratio of 0.82 for each randomization could be detected with 90% power with two-sided α = .05. Overall survival (OS) was a secondary outcome. Results Interim analyses crossed the futility boundaries for demonstrating superiority of both once-per-week regimens and once-every-2-weeks regimens. After a median follow-up of 6 years, a significant interaction developed between the two randomization factors (DFS P = .024; OS P = .010) in the 2,716 patients randomly assigned in the original design, which precluded interpretation of the two factors separately. Comparing all four arms showed a significant difference in OS (P = .040) but not in DFS (P = .11), with all treatments given once every 2 weeks associated with the highest OS. This difference in OS seemed confined to patients with hormone receptor–negative/human epidermal growth factor receptor 2 (HER2) –negative tumors (P = .067), with no differences seen with hormone receptor–positive/HER2-negative (P = .90) or HER2-positive tumors (P = .40). Conclusion Patients achieved a similar DFS with any of these regimens. Subset analysis suggests the hypothesis that once-every-2-weeks dosing may be best for patients with hormone receptor–negative/HER2-negative tumors. PMID:25422488

  9. Microcomputerizing Your Paperwork. Part III: Financial Management Programs.

    ERIC Educational Resources Information Center

    Pogrow, Stanley

    1982-01-01

    Examines computerized financial accounting programs that can help administrators with the management of school finances. A detailed chart of financial accounting software packages for microcomputers is included. (JJD)

  10. School Bus Routing and Scheduling: When to Use Computer-Assisted Methods and Programs.

    ERIC Educational Resources Information Center

    Walcott, Wayne; And Others

    1986-01-01

    Discusses issues concerning the use of computers in school bus scheduling and routing. Examines the advantages, technical considerations, and costs of changing to a computerized system. Offers a five-point approach toward implementation and includes a table of comparative data for routing and scheduling models for a typical school bus fleet. (IW)

  11. A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling

    NASA Astrophysics Data System (ADS)

    Berthold, Timo; Heinz, Stefan; Lübbecke, Marco E.; Möhring, Rolf H.; Schulz, Jens

    We propose a hybrid approach for solving the resource-constrained project scheduling problem which is an extremely hard to solve combinatorial optimization problem of practical relevance. Jobs have to be scheduled on (renewable) resources subject to precedence constraints such that the resource capacities are never exceeded and the latest completion time of all jobs is minimized.

  12. Model Solar Energy Training Program III. Final Report.

    ERIC Educational Resources Information Center

    Talcott Mountain Science Center, Avon, CT.

    Recognizing that an important key to success of developing solar technologies is the availability of skilled labor to produce, install, and maintain it, the Talcott Mountain Science Center in Avon, Connecticut created a training program for vocational-technical and high school staff. The program's goal was to develop curriculum materials that…

  13. Programs for Infants and Young Children. Part III: Health.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Directed toward the improvement of health care for mothers and young children, this report describes a number of comprehensive programs focused on health and reports on projects which have singled out one or more specific maternal or child health services. Included are descriptions of existing community programs for pregnant schoolgirls, health…

  14. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    PubMed

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid. PMID:25910254

  15. US Department of Energy Office of Civilian Radioactive Waste Management quarterly report on program cost and schedule; First quarter, FY 1992

    SciTech Connect

    1992-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical current cost profiles (extracted from the DOE Financial Information System) are presented for each of the major program elements. Also included in this report are the program schedule baseline, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through December 1991.

  16. A Second Year Evaluation of the ESEA Title III Urban Leadership Program.

    ERIC Educational Resources Information Center

    Frerichs, Allen H.

    The Urban Leadership Program, funded under Title III of the Elementary and Secondary Education Act, was carried out among sixth graders at the Albert Einstein School in Chicago, Illinois. The primary purpose of the program was to develop skills and competence to prepare participants for survival and success in a large urban environment. A…

  17. DOE-EPRI distributed wind Turbine Verification Program (TVP III)

    SciTech Connect

    McGowin, C.; DeMeo, E.; Calvert, S.

    1997-12-31

    In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Vermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation using smaller {open_quotes}clusters{close_quotes} of wind turbines connected directly to the electricity distribution system. This paper presents an overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.

  18. [Psychosocial rehabilitation at the dawn of the 21st century: III: Interdisciplinary evaluation method and bio-psycho-social schedule].

    PubMed

    Grasset, François; Pomini, Valentino; Favrod, Jérôme; Orita, Alina; Veillon, Henri; Cucchia, Anne-Therèse

    2004-04-01

    During the past 20 years, therapeutic and rehabilitative modalities in the field of psychosocial rehabilitation have been diversified in becoming more specific. We have the possibility to offer individualized rehabilitation programs as well as in the general field of socio-professional goals as in the clinical field according to the patients' needs and personal assets. The content of these programs associates various forms of specialized medical and paramedical services. The indications are established trough a careful assessment. The rehabilitation unit of the University Department of Psychiatry in Lausanne has developed a multidisciplinary assessment method based on the bio-psychosocial integrative model and the vulnerability-stress model in integrating the level of experience of Wood for the analysis of the psychosocial functioning. This results in a structured assessment program, which leads to a multidisciplinary comprehensive assessment (difficulties versus adaptative resources). PMID:15209050

  19. THE CONTINUOUS FLOW ANALYZER AUTOMATION SYSTEM. PART III -- PROGRAM DOCUMENTATION

    EPA Science Inventory

    This report contains complete documentation for the 21 programs and eight data files of the EPA Continuous Flow Analyzer Automation System. This system can receive lists of samples from the Sample File Control System and return the measured concentrations to that system. It is ca...

  20. Evaluation Report III: The Robert Noyce Scholarship Program at CSUB

    ERIC Educational Resources Information Center

    Wang, Jianjun

    2013-01-01

    California State University, Bakersfield (CSUB) received funding from National Science Foundation's (NSF) Robert Noyce Teacher Scholarship Program to recruit Noyce Scholars from upper-division science, technology, engineering, and mathematics (STEM) majors, graduate students, and professionals switched to STEM teaching from other fields (NSF…

  1. School Information: Phase III of Quality Assessment Program. Appendix B.

    ERIC Educational Resources Information Center

    Burson, William W.

    This questionnaire, used in the Educational Quality Assessment Program in Pennsylvania, was designed to be filled out by school administrators. It requests information about staff size, enrollment size, library books available, hours of paraprofessionals, and quality of housing in school district. It also includes a checklist to show the extent of…

  2. Hawaii Integrated Biofuels Research Program: Final Subcontract Report, Phase III

    SciTech Connect

    Not Available

    1992-05-01

    This report is a compilation of studies done to develop an integrated set of strategies for the production of energy from renewable resources in Hawaii. Because of the close coordination between this program and other ongoing DOE research, the work will have broad-based applicability to the entire United States.

  3. A Division III Student-Athlete Academic Support Program Model.

    ERIC Educational Resources Information Center

    Smith, David A.; Herman, William E.

    Varsity student-athletes (SAs) in National Collegiate Athletic Association member institutions encounter obstacles to their academic achievement that non-athletes do not, such as time for physical training and practice, and travel away from campus for games. A program is described that provides support for SAs. The Student-Athlete Academic Support…

  4. Does the benefits schedule of cash assistance programs affect the purchase of temptation goods? Evidence from Peru.

    PubMed

    White, Justin S; Basu, Sanjay

    2016-03-01

    A critique of cash assistance programs is that beneficiaries may spend the money on "temptation goods" such as alcohol and tobacco. We exploit a change in the payment schedule of Peru's conditional cash transfer program to identify the impact of benefit receipt frequency on the purchase of temptation goods. We use annual household data among cross-sectional and panel samples to analyze the effect of the policy change on the share of the household budget devoted to four categories of temptation goods. Using a difference-in-differences estimation approach, we find that larger, less frequent payments increased the expenditure share of alcohol by 55-80% and sweets by 10-40%, although the absolute magnitudes of these effects are small. Our study suggests that less frequent benefits scheduling may lead cash recipients to make certain types of temptation purchases. PMID:26874596

  5. Flexible Scheduling.

    ERIC Educational Resources Information Center

    Davis, Harold S.; Bechard, Joseph E.

    A flexible schedule allows teachers to change group size, group composition, and class length according to the purpose of the lesson. This pamphlet presents various "master" schedules for flexible scheduling: (1) Simple block schedules, (2) back-to-back schedules, (3) interdisciplinary schedules, (4) school-wide block schedules, (5) open-lab…

  6. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  7. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  8. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  9. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  10. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  11. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  12. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  13. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  14. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  15. CHAP III- CHARRING ABLATOR PROGRAM FOR ADVANCED INVESTIGATION OF THERMAL PROTECTION SYSTEMS FOR ENTRY

    NASA Technical Reports Server (NTRS)

    Stroud, C. W.

    1994-01-01

    The transient response of a thermal protection material to heat applied to the surface can be calculated using the CHAP III computer program. CHAP III can be used to analyze pyrolysis gas chemical kinetics in detail and examine pyrolysis reactions-indepth. The analysis includes the deposition of solid products produced by chemical reactions in the gas phase. CHAP III uses a modelling technique which can approximate a wide range of ablation problems. The energy equation used in CHAP III incorporates pyrolysis (both solid and gas reactions), convection, conduction, storage, work, kinetic energy, and viscous dissipation. The chemically reacting components of the solid are allowed to vary as a function of position and time. CHAP III employs a finite difference method to approximate the energy equations. Input values include specific heat, thermal conductivity, thermocouple locations, enthalpy, heating rates, and a description of the chemical reactions expected. The output tabulates the temperature at locations throughout the ablator, gas flow within the solid, density of the solid, weight of pyrolysis gases, and rate of carbon deposition. A sample case is included, which analyzes an ablator material containing several pyrolysis reactions subjected to an environment typical of entry at lunar return velocity. CHAP III is written in FORTRAN IV for batch execution and has been implemented on a CDC CYBER 170 series computer operating under NOS with a central memory requirement of approximately 102K (octal) of 60 bit words. This program was developed in 1985.

  16. Revenues & Expenses, 2004-2009. NCAA[R] Division III Intercollegiate Athletics Programs Report

    ERIC Educational Resources Information Center

    Fulks, Daniel L., Comp.

    2010-01-01

    This report provides summary information concerning revenues and expenses of the National Collegiate Athletic Association (NCAA) Division III athletics programs for the fiscal years 2004 through 2009. It is the result of surveys conducted during the fall of each of those years. Although similar studies have been conducted for the NCAA since 1969,…

  17. Sequential Mathematics Course III. Volume One. Staff Development Program 1986-1987.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.

    The Sequential Mathematics Sequence provides students with an integrated course of study, including lessons which interweave algebra, geometry, logic, probability, and mathematical systems. This handbook is designed to meet the needs of teachers who will be teaching Course III in the sequence. The handbook, for use with staff development programs,…

  18. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Standard III-Program needs assessment. 36.12 Section 36.12 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION MINIMUM ACADEMIC STANDARDS FOR THE BASIC EDUCATION OF INDIAN CHILDREN AND NATIONAL CRITERIA FOR DORMITORY SITUATIONS...

  19. Content Analysis Schedule for Bilingual Education Programs: Bilingual Education in a Consortium.

    ERIC Educational Resources Information Center

    Hess, Richard T.; Shore, Marietta Saravia

    This content analysis schedule for the City of Lakewood School District of Lakewood, New Jersey, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  20. 78 FR 74229 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, Clinical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ... FFS Fee-for-service FOBT Fecal occult blood test FQHC Federally qualified health center FR Federal... November 25, 1991 (56 FR 59502) set forth the first fee schedule used for payment for physicians' services... rule, published November 2, 1998 (63 FR 58814), effective for services furnished in CY 1999. Based...

  1. Content Analysis Schedule for Bilingual Education Programs: Compton Elementary Bilingual Education Plan.

    ERIC Educational Resources Information Center

    Hess, Richard T.; Shore, Marietta Saravia

    This content analysis schedule for the Compton Elementary Bilingual Education Plan of Compton, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and…

  2. Integrating Expanded Core Sessions into the K-12 Program: A High School Scheduling Approach

    ERIC Educational Resources Information Center

    Lohmeier, Keri L.

    2007-01-01

    The author provides one perspective on how to integrate sessions of the expanded core curriculum for students who are visually impaired into a high school schedule to support an effective balance between (a) required hours for core academic courses and appropriate pacing of the courses for those students and (b) core courses and the expanded core…

  3. Content Analysis Schedule for Bilingual Education Programs: HABLA-Helping Advance Bilingual Learning in Abernathy.

    ERIC Educational Resources Information Center

    Hess, Richard T.; Shore, Marietta Saravia

    This content analysis schedule for HABLA-Helping Advance Bilingual Learning in Abernathy, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  4. Content Analysis Schedule for Bilingual Education Programs: Adaptations of Bilingual Education.

    ERIC Educational Resources Information Center

    Hess, Richard T.

    This content analysis schedule for Adaptations of Bilingual Education of Orange, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  5. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    ERIC Educational Resources Information Center

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  6. Content Analysis Schedule for Bilingual Education Programs: Programa en Dos Lenguas.

    ERIC Educational Resources Information Center

    Ludanyi, R. P.; Shore, Marietta Saravia

    This content analysis schedule for the "Programa en Dos Lenguas" of Fort Worth, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  7. Space Shuttle 1976 into mainstream development - Program commitments on schedule to insure careful progress

    NASA Technical Reports Server (NTRS)

    Malkin, M. S.

    1976-01-01

    A progress report is given on various systems, noting conformity to schedule or changes in design. The Orbiter thermal protection system, the Space Shuttle main engine, the intertank for the structural test article (STA), thrust vector control systems, the Kennedy Space Center launch processing system, and Orbiters No. 1 and No. 2 are discussed.

  8. 78 FR 65621 - Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction AGENCY... comment for an information collection entitled, ``Implementation of Title I/II Program...

  9. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  10. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  11. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  12. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  13. The National Heart, Lung, and Blood Institute Recipient Epidemiology and Donor Evaluation Study (REDS-III): A research program striving to improve blood donor and transfusion recipient outcomes

    PubMed Central

    Kleinman, Steven; Busch, Michael P; Murphy, Edward L; Shan, Hua; Ness, Paul; Glynn, Simone A.

    2014-01-01

    Background The Recipient Epidemiology and Donor Evaluation Study -III (REDS-III) is a 7-year multicenter transfusion safety research initiative launched in 2011 by the National Heart, Lung, and Blood Institute. Study design The domestic component involves 4 blood centers, 12 hospitals, a data coordinating center, and a central laboratory. The international component consists of distinct programs in Brazil, China, and South Africa which involve US and in-country investigators. Results REDS-III is using two major methods to address key research priorities in blood banking/transfusion medicine. First, there will be numerous analyses of large “core” databases; the international programs have each constructed a donor/donation database while the domestic program has established a detailed research database that links data from blood donors and their donations, the components made from these donations, and data extracts from the electronic medical records of the recipients of these components. Secondly, there are more than 25 focused research protocols involving transfusion recipients, blood donors, or both that are either in progress or scheduled to begin within the next 3 years. Areas of study include transfusion epidemiology and blood utilization; transfusion outcomes; non-infectious transfusion risks; HIV-related safety issues (particularly in the international programs); emerging infectious agents; blood component quality; donor health and safety; and other donor issues. Conclusions It is intended that REDS-III serve as an impetus for more widespread recipient and linked donor-recipient research in the US as well as to help assure a safe and available blood supply in the US and in international locations. PMID:24188564

  14. NCSMEMO, an IBM PC program using dBASE III to cross-reference letters

    SciTech Connect

    Klave, D.L.; Rogers, C.A.

    1985-08-01

    NCSMEMO is a database management system consisting of six command files written in Ashton-Tate's dBASE III programming language. NCSMEMO provides a method of cross-referencing Nuclear Criticality Safety Memoranda to facilitate locating information based on keywords and provides an abstract of each memo. The primary benefit of NCSMEMO is its ability to quickly search through abstracts of over 470 memos and locate those which apply to specific keywords. NCSMEMO is menu driven for ease of use.

  15. Priorities and allocations support for energy: keeping energy programs on schedule

    SciTech Connect

    Not Available

    1985-08-01

    This publication has covered DOE and DOC procedures related to an application for rating authority for an energy program, the DPAS (Defense Priorities and Allocations System) and the Special Priorities Assistance Program's relation to priorities and allocations for energy programs. A person engaged in an eligible energy program or project must be familiar with DPAS rules, regulations and procedures. There are important benefits to be gained by the Government and the energy industry through the proper use of the priorities and allocations system.

  16. Residential Programming for Mentally Retarded Persons. Volume III, Developmental Programming in the Residential Facility.

    ERIC Educational Resources Information Center

    National Association for Retarded Children, Arlington, TX. South Central Regional Office.

    The third of four booklets on residential programing for the mentally retarded is intended to help parents evaluate residential services and participate in decisions about program design and implementation. Areas of appropriate program emphasis are indicated for different age groups and for the various degrees of mental retardation from profound…

  17. Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

    NASA Technical Reports Server (NTRS)

    Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun

    2012-01-01

    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

  18. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  19. Alternatives in Scheduling Patterns: Practitioner Implementation of Minicourse Programs in Selected Midwestern High Schools.

    ERIC Educational Resources Information Center

    Hansen, Patricia; Guenther, John

    The purposes of the document are to report on the status of social studies minicourse programs in selected midwestern high schools and to provide information to schools regarding obstacles to minicourses as alternatives to traditional programs. A 1976-77 survey of 265 midwestern high schools determined that only 60 (23%) of the schools offered…

  20. G-III Precision Autopilot Development in Support of UAVSAR Program

    NASA Technical Reports Server (NTRS)

    Lee, James

    2007-01-01

    The primary objective of the UAVSAR Project is to develop a miniaturized polarimetric L-band synthetic aperture radar (SAR) for use on an unmanned aerial vehicle (UAV) or minimally piloted vehicle. This viewgraph presentation reviews NASA Dryden's role in the UAVSAR program. The G-III aircraft is described and shown, as well as a high level system architecture. The goals of the Platform Precision Autopilot (PPA) that it are shall fly the G-III within a 10 m (32.8 ft) diameter tube for at least 90% of each data take in conditions of calm to light atmospheric disturbances, as defined in MIL-STD-1797. That it minimize motion during data collection. It is critical to operate the UAVSAR System on a steady platform.

  1. Epstein-Barr virus growth/latency III program alters cellular microRNA expression

    SciTech Connect

    Cameron, Jennifer E. Fewell, Claire Yin, Qinyan McBride, Jane Wang Xia Lin Zhen

    2008-12-20

    The Epstein-Barr virus (EBV) is associated with lymphoid and epithelial cancers. Initial EBV infection alters lymphocyte gene expression, inducing cellular proliferation and differentiation as the virus transitions through consecutive latency transcription programs. Cellular microRNAs (miRNAs) are important regulators of signaling pathways and are implicated in carcinogenesis. The extent to which EBV exploits cellular miRNAs is unknown. Using micro-array analysis and quantitative PCR, we demonstrate differential expression of cellular miRNAs in type III versus type I EBV latency including elevated expression of miR-21, miR-23a, miR-24, miR-27a, miR-34a, miR-146a and b, and miR-155. In contrast, miR-28 expression was found to be lower in type III latency. The EBV-mediated regulation of cellular miRNAs may contribute to EBV signaling and associated cancers.

  2. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board...

  3. ESEA, Title III Dissemination Program Evaluation Report, 1972-73, 1973-74. Sections I and II.

    ERIC Educational Resources Information Center

    Soper, Dorothy B.

    This report evaluates the New Jersey ESEA Title III dissemination program during its first two years, 1972-74. Purposes of the program are to (a) determine if essential elements of successful education programs can be transferred from originating districts to adopter districts while yielding comparable student gains, and (b) provide educators with…

  4. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  5. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  6. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  7. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  8. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  9. The scheduled squeeze on children's programs: tracking the implications of projected federal spending patterns.

    PubMed

    Steuerle, C Eugene; Isaacs, Julia B

    2014-12-01

    Federal programs for children are under increasing budgetary pressure. According to current federal law or any budget alternative being offered by the president or congressional leaders, spending on children would decline as a share of the budget and of the national economy. This article summarizes past, current, and projected budgets for children's programs. It traces significant historical expansions of means-tested programs, such as the Supplemental Nutrition Assistance Program; depicts fairly significant declines in more universal supports, such as the income tax exemption for dependents; and shows the future squeeze on children's programs brought about by automatic growth in health, retirement, and tax subsidy programs, along with the failure of revenues to keep pace with the overall growth in spending. Federal programs for health care have been a mixed blessing for children: Medicaid has grown to be the largest federal support for children, but overall federal health care costs eat away at the share of the budgetary pie left for anything else. PMID:25489041

  10. Phase I/II Study Evaluating Early Tolerance in Breast Cancer Patients Undergoing Accelerated Partial Breast Irradiation Treated With the MammoSite Balloon Breast Brachytherapy Catheter Using a 2-Day Dose Schedule

    SciTech Connect

    Wallace, Michelle; Martinez, Alvaro; Mitchell, Christina; Chen, Peter Y.; Ghilezan, Mihai; Benitez, Pamela; Brown, Eric; Vicini, Frank

    2010-06-01

    Purpose: Initial Phase I/II results using balloon brachytherapy to deliver accelerated partial breast irradiation (APBI) in 2 days in patients with early-stage breast cancer are presented. Materials and Methods: Between March 2004 and August 2007, 45 patients received adjuvant radiation therapy after lumpectomy with balloon brachytherapy in a Phase I/II trial delivering 2800 cGy in four fractions of 700 cGy. Toxicities were evaluated using the National Cancer Institute Common Toxicity Criteria for Adverse Events v3.0 scale and cosmesis was documented at >=6 months. Results: The median age was 66 years (range, 48-83) and median skin spacing was 12 mm (range, 8-24). The median follow-up was 11.4 months (5.4-48 months) with 21 patients (47%) followed >=1 year, 11 (24%) >=2 years, and 7 (16%) >=3 years. At <6 months (n = 45), Grade II toxicity rates were 9% radiation dermatitis, 13% breast pain, 2% edema, and 2% hyperpigmentation. Grade III breast pain was reported in 13% (n = 6). At >=6 months (n = 43), Grade II toxicity rates were: 2% radiation dermatitis, 2% induration, and 2% hypopigmentation. Grade III breast pain was reported in 2%. Infection was 13% (n = 6) at <6 months and 5% (n = 2) at >=6 months. Persistent seroma >=6 months was 30% (n = 13). Fat necrosis developed in 4 cases (2 symptomatic). Rib fractures were seen in 4% (n = 2). Cosmesis was good/excellent in 96% of cases. Conclusions: Treatment with balloon brachytherapy using a 2-day dose schedule resulted acceptable rates of Grade II/III chronic toxicity rates and similar cosmetic results observed with a standard 5-day accelerated partial breast irradiation schedule.

  11. An Approximation Solution to Refinery Crude Oil Scheduling Problem with Demand Uncertainty Using Joint Constrained Programming

    PubMed Central

    Duan, Qianqian; Yang, Genke; Xu, Guanglin; Pan, Changchun

    2014-01-01

    This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can be more practical for optimizing crude oil operations. Using joint chance constraints, the demand uncertainty is treated by specifying proximity level on the satisfaction of product demands. However, the joint chance constraints usually hold strong nonlinearity and consequently, it is still hard to handle it directly. In this paper, an approximation method combines a relax-and-tight technique to approximately transform the joint chance constraints to a serial of parameterized linear constraints so that the complicated problem can be attacked iteratively. The basic idea behind this approach is to approximate, as much as possible, nonlinear constraints by a lot of easily handled linear constraints which will lead to a well balance between the problem complexity and tractability. Case studies are conducted to demonstrate the proposed methods. Results show that the operation cost can be reduced effectively compared with the case without considering the demand correlation. PMID:24757433

  12. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL... programs: A1 Aircraft Department of Defense. 1 A2 Missiles Do. A3 Ships Do. A4 Tank—Automotive Do....

  13. Design and Evaluation of the User-Adapted Program Scheduling system based on Bayesian Network and Constraint Satisfaction

    NASA Astrophysics Data System (ADS)

    Iwasaki, Hirotoshi; Sega, Shinichiro; Hiraishi, Hironori; Mizoguchi, Fumio

    In recent years, lots of music content can be stored in mobile computing devices, such as a portable digital music player and a car navigation system. Moreover, various information content like news or traffic information can be acquired always anywhere by a cellular communication and a wireless LAN. However, usability issues arise from the simple interfaces of mobile computing devices. Moreover, retrieving and selecting such content poses safety issues, especially while driving. Thus, it is important for the mobile system to recommend content automatically adapted to user's preference and situation. In this paper, we present the user-adapted program scheduling that generates sequences of content (Program) suiting user's preference and situation based on the Bayesian network and the Constraint Satisfaction Problem (CSP) technique. We also describe the design and evaluation of its realization system, the Personal Program Producer (P3). First, preference such as a genre ratio of content in a program is learned as a Bayesian network model using simple operations such as a skip behavior. A model including each content tends to become large-scale. In order to make it small, we present the model separation method that carries out losslessly compression of the model. Using the model, probabilistic distributions of preference to generate constraints are inferred. Finally satisfying the constraints, a program is produced. This kind of CSP has an issue of which the number of variables is not fixedness. In order to make it variable, we propose a method using metavariables. To evaluate the above methods, we applied them to P3 on a car navigation system. User evaluations helped us clarify that the P3 can produce the program that a user prefers and adapt it to the user.

  14. Regional Office Procedures. Stage I Final Report for the Study of Program Management Procedures in the Campus-Based and Basic Grant Programs. (Volume III).

    ERIC Educational Resources Information Center

    Puma, Michael J.

    Volume III of a study of program management procedures in the campus-based and Basic Educational Opportunity Grant (BEOG) programs provides a description of procedures employed within the U.S. Office of Education regional offices to administer the Basic Grant and campus-based student financial assistance programs. The objective of the report is to…

  15. Program for the Improvement of Downhole Drilling-Motor Bearings and Seals. Phase III, Part 2: final report

    SciTech Connect

    Not Available

    1980-03-01

    Six months of activity to improve downhole drilling-motor bearings and seals for geothermal applications are reported. The following are covered: seal testing and evaluation, bearing-seal package testing and evaluation, lubricant testing and evaluation, and program status, plans and schedule. (MHR)

  16. Graduate Program Scheduling Gains Flexibility through Container Courses: A Case Study

    ERIC Educational Resources Information Center

    Rose, Richard

    2011-01-01

    Online course delivery makes possible one innovation which can provide each student with greater program flexibility as well as some personal ownership of the direction and pace of his degree progress. This concept can be called the "container course." A container course is the offering of more than one course simultaneously under a single course…

  17. Medicare program; payment policies under the physician fee schedule, five-year review of work relative value units, clinical laboratory fee schedule: signature on requisition, and other revisions to part B for CY 2012. Final rule with comment period.

    PubMed

    2011-11-28

    This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues. PMID:22145186

  18. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  19. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  20. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  1. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  2. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  3. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  4. Comparison between different off-season resistance training programs in Division III American college football players.

    PubMed

    Hoffman, Jay R; Ratamess, Nicholas A; Klatt, Marc; Faigenbaum, Avery D; Ross, Ryan E; Tranchina, Nicholas M; McCurley, Robert C; Kang, Jie; Kraemer, William J

    2009-01-01

    The purpose of this study was to examine the efficacy of periodization and to compare different periodization models in resistance trained American football players. Fifty-one experienced resistance trained American football players of an NCAA Division III football team (after 10 weeks of active rest) were randomly assigned to 1 of 3 groups that differed only in the manipulation of the intensity and volume of training during a 15-week offseason resistance training program. Group 1 participated in a nonperiodized (NP) training program, group 2 participated in a traditional periodized linear (PL) training program, and group 3 participated in a planned nonlinear periodized (PNL) training program. Strength and power testing occurred before training (PRE), after 7 weeks of training (MID), and at the end of the training program (POST). Significant increases in maximal (1-repetition maximum [1RM]) squat, 1RM bench press, and vertical jump were observed from PRE to MID for all groups; these increases were still significantly greater at POST; however, no MID to POST changes were seen. Significant PRE to POST improvements in the medicine ball throw (MBT) were seen for PL group only. The results do not provide a clear indication as to the most effective training program for strength and power enhancements in already trained football players. Interestingly, recovery of training-related performances was achieved after only 7 weeks of training, yet further gains were not observed. These data indicate that longer periods of training may be needed after a long-term active recovery period and that active recovery may need to be dramatically shortened to better optimize strength and power in previously trained football players. PMID:19130636

  5. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  6. 75 FR 26349 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... Physician Fee Schedule and Other Revisions to Part B for CY 2010; Final Rule'' (74 FR 61738), as well as... Physician Fee Schedule and Other Revisions to Part B for CY 2010; Corrections'' (74 FR 65449). DATES...: Rebecca Cole, (410) 786-4497. SUPPLEMENTARY INFORMATION: I. Background In FR Doc. E9-26502 of November...

  7. Mapping of Primary Instructional Methods and Teaching Techniques for Regularly Scheduled, Formal Teaching Sessions in an Anesthesia Residency Program.

    PubMed

    Vested Madsen, Matias; Macario, Alex; Yamamoto, Satoshi; Tanaka, Pedro

    2016-06-01

    In this study, we examined the regularly scheduled, formal teaching sessions in a single anesthesiology residency program to (1) map the most common primary instructional methods, (2) map the use of 10 known teaching techniques, and (3) assess if residents scored sessions that incorporated active learning as higher quality than sessions with little or no verbal interaction between teacher and learner. A modified Delphi process was used to identify useful teaching techniques. A representative sample of each of the formal teaching session types was mapped, and residents anonymously completed a 5-question written survey rating the session. The most common primary instructional methods were computer slides-based classroom lectures (66%), workshops (15%), simulations (5%), and journal club (5%). The number of teaching techniques used per formal teaching session averaged 5.31 (SD, 1.92; median, 5; range, 0-9). Clinical applicability (85%) and attention grabbers (85%) were the 2 most common teaching techniques. Thirty-eight percent of the sessions defined learning objectives, and one-third of sessions engaged in active learning. The overall survey response rate equaled 42%, and passive sessions had a mean score of 8.44 (range, 5-10; median, 9; SD, 1.2) compared with a mean score of 8.63 (range, 5-10; median, 9; SD, 1.1) for active sessions (P = 0.63). Slides-based classroom lectures were the most common instructional method, and faculty used an average of 5 known teaching techniques per formal teaching session. The overall education scores of the sessions as rated by the residents were high. PMID:27243580

  8. Scheduling game

    SciTech Connect

    Kleck, W

    1982-04-01

    Structuring a schedule - whether by Critical Path Method (CPM) or Precedence Charting System (PCS) - involves estimating the duration of one or more activities and arranging them in the most logical sequence. Given the start date, the completion date is relatively simple to determine. What is then so complicated about the process. It is complicated by the people involved - the people who make the schedules and the people who attempt to follow them. Schedules are an essential part of project management and construction contract administration. Much of the material available pertains to the mechanics of schedules, the types of logic networks, the ways that data can be generated and presented. This paper sheds light on other facets of the subject - the statistical and philosophical fundamentals involved in scheduling.

  9. A Sequenced Instructional Program in Physical Education for the Handicapped, Phase III. Producing and Disseminating Demonstration Packages. Final Report.

    ERIC Educational Resources Information Center

    Carr, Dorothy B.; Avance, Lyonel D.

    Presented is a sequenced instructional program in physical education which constitutes the third of a three-phase, 4-year project, funded by Title III, for handicapped children, preschool through high school levels, in the Los Angeles Unified School District. Described are the project setting and the following accomplishments: a curriculum guide…

  10. Committee of the Undergraduate Program in Mathematics Geometry Conference, Part III: Geometric Transformation Groups and Other Topics.

    ERIC Educational Resources Information Center

    Durst, Lincoln K., Ed.

    This is Part III of the first volume of the proceedings of the Committee on the Undergraduate Program in Mathematics (CUPM) Geometry Conference, held at Santa Barbara in June, 1967. The purpose of the conference was to consider the status of geometry in colleges at the undergraduate level. The conference, attended by undergraduate mathematics…

  11. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and...

  12. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and...

  13. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and...

  14. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and...

  15. Introduction of sequential inactivated polio vaccine-oral polio vaccine schedule for routine infant immunization in Brazil's National Immunization Program.

    PubMed

    Domingues, Carla Magda Allan S; de Fátima Pereira, Sirlene; Cunha Marreiros, Ana Carolina; Menezes, Nair; Flannery, Brendan

    2014-11-01

    In August 2012, the Brazilian Ministry of Health introduced inactivated polio vaccine (IPV) as part of sequential polio vaccination schedule for all infants beginning their primary vaccination series. The revised childhood immunization schedule included 2 doses of IPV at 2 and 4 months of age followed by 2 doses of oral polio vaccine (OPV) at 6 and 15 months of age. One annual national polio immunization day was maintained to provide OPV to all children aged 6 to 59 months. The decision to introduce IPV was based on preventing rare cases of vaccine-associated paralytic polio, financially sustaining IPV introduction, ensuring equitable access to IPV, and preparing for future OPV cessation following global eradication. Introducing IPV during a national multivaccination campaign led to rapid uptake, despite challenges with local vaccine supply due to high wastage rates. Continuous monitoring is required to achieve high coverage with the sequential polio vaccine schedule. PMID:25316829

  16. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  17. 76 FR 42771 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...--Federally Qualified Health Center FR--Federal Register FTE--full time equivalent GAF--Geographic adjustment... rule, published on November 25, 1991 (56 FR 59502), set forth the fee schedule for payment for... service in a final rule, published November 2, 1998 (63 FR 58814), effective for services furnished...

  18. 75 FR 40039 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... renal disease FAX Facsimile FDA Food and Drug Administration (HHS) FFS Fee-for-service FR Federal... rule, published on November 25, 1991 (56 FR 59502), set forth the fee schedule for payment for...' service in a final rule, published November 2, 1998 (63 FR 58814), effective for services furnished...

  19. 77 FR 68891 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... prescribing FFS Fee-for-service FR Federal Register GAF Geographic adjustment factor GAO Government... comment period (76 FR 72452). Several types of providers are projected to see decreases in Medicare PFS... on November 25, 1991 (56 FR 59502) set forth the fee schedule for payment for physicians'...

  20. 76 FR 73025 - Medicare Program; Payment Policies Under the Physician Fee Schedule, Five-Year Review of Work...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as......

  1. Creating a Complex Schedule with "REFLEX."

    ERIC Educational Resources Information Center

    Kren, George M.; Christakes, George

    1991-01-01

    Discusses "REFLEX," a software package for scheduling. Explores the program's applications in preparing a departmental class schedule. Explains that "REFLEX" includes a filter function and some attributes of a spreadsheet but lacks the ability to interact with other databases. Concludes that the program can make scheduling easier and more…

  2. A DSN optimal spacecraft scheduling model

    NASA Technical Reports Server (NTRS)

    Webb, W. A.

    1982-01-01

    A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's Method and a heuristic starting algorithm.

  3. 77 FR 44721 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ...This major proposed rule addresses changes to the physician fee schedule, payments for Part B drugs, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It would also implement provisions of the Affordable Care Act by establishing a face-to-face encounter as a condition of payment......

  4. 76 FR 1669 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ...) * (17) * (17) * (17) * (17) * (17) * (17) (19) Ind. Alloc. (1st part) Step 8 See (18) 0.65 5.27 0.58 0.58 0.00 0.25 0.25 0.00 (20) Ind. Alloc. Formulas (2nd part)..... Step 8 See Step 8 (15) (15) (15)+(11... Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2011; Final Rule'' (75...

  5. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  6. NIF Title III engineering plan

    SciTech Connect

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  7. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  8. The capillary pumped loop III (CAPL III) flight demonstration description and status

    NASA Astrophysics Data System (ADS)

    Kim, Jeong (Jake) H.; Cheung, Kwok-Hung; Butler, Dan; Ku, Jentung; Haught, Eric; Kroliczeck, Edward J.; Cullimore, Brent; Baumann, Jane

    1997-01-01

    To realize the full benefits of capillary pump loop (CPL) devices, for use in spacecraft thermal control subsystems, a reliable, load sharing, multiple evaporator system must be developed and successfully demonstrated in space. The Capillary Pumped Loop Flight Experiment 3 (CAPL III) will be the second attempt to flight demonstrate a multiple evaporator CPL in space environment. Using the lessons learned from CAPL I, which was flown aboard STS-60 in February 1994, new hardware and concepts are being developed for CAPL III to enable load sharing between evaporators, reliable system start-up/re-start, and reliable continuous operation. Started in May 1996, CAPL III is primarily a joint venture between the Naval Research Laboratory and the NASA-Goddard Space Flight Center, with Swales and Associates, Inc. as an industry partner. The program is scheduled to meet an STS flight opportunity in mid-1998. This paper will present the requirements and the preliminary design description of the CAPL III CPL system.

  9. Program for Assisting the Replacement of Industrial Solvents PARIS III User’s Guide

    EPA Science Inventory

    PARIS III is a third generation Windows-based computer software to assist the design of less harmful solvent replacements by estimating values of the solvent properties that characterize the static, dynamic, performance, and environmental behavior of the original solvent mixture ...

  10. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  11. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands. 147.2101 Section 147.2101 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS...

  12. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  13. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-03-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processors. User program and their gangs of processors are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantums are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory. 2 refs., 1 fig.

  14. What Do Schools Want? Assessing Elementary School Administrator and Teacher Preferences Related to Nutrition Education Program Scheduling

    ERIC Educational Resources Information Center

    Hermann, Janice; Parker, Stephany; Phelps, Josh; Brown, Barbara

    2011-01-01

    Extension is positioned to provide school-based nutrition education programs as required by the 2004 Child Nutrition and WIC Reauthorization Act. To enhance program acceptance and sustainability, it is important to consider school administrators' and teachers' interests and preferences regarding nutrition education programming. The project…

  15. 40 CFR 52.2625 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.2625 Section 52.2625 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wyoming § 52.2625 Compliance schedules. (a) The compliance schedules for the...

  16. Enhanced Memetic Algorithm for Task Scheduling

    NASA Astrophysics Data System (ADS)

    Padmavathi, S.; Shalinie, S. Mercy; Someshwar, B. C.; Sasikumar, T.

    Scheduling tasks onto the processors of a parallel system is a crucial part of program parallelization. Due to the NP-hardness of the task scheduling problem, scheduling algorithms are based on heuristics that try to produce good rather than optimal schedules. This paper proposes a Memetic algorithm with Tabu search and Simulated Annealing as local search for solving Task scheduling problem considering communication contention. This problem consists of finding a schedule for a general task graph to be executed on a cluster of workstations and hence the schedule length can be minimized. Our approach combines local search (by self experience) and global search (by neighboring experience) possessing high search efficiency. The proposed approach is compared with existing list scheduling heuristics. The numerical results clearly indicate that our proposed approach produces solutions which are closer to optimality and/or better quality than the existing list scheduling heuristics.

  17. ASTER Scheduling Prioritization Function

    NASA Technical Reports Server (NTRS)

    Cohen, Ron

    1996-01-01

    ASTER schedules are generated by an automated scheduling system. This scheduler will generate psuedo-optimal schedules based on a priority scheme. This priority scheme is controlled by the Science Team.

  18. Pilot Educational Program for Mentally Disordered Minors 1972-1973: End of the Budget Period Report; E. S. E. A. Title III.

    ERIC Educational Resources Information Center

    Santa Cruz County Superintendent of Schools, CA.

    The report describes a 3-year, ongoing pilot project designed to devise a remedial educational program for 10 autistic elementary school children (5- to 12-years-old) that would prepare some students for subsequent entry into regular or special education public school classes. Described is a typical daily schedule emphasizing individual…

  19. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  20. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  1. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  2. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in the Finding Aids... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  3. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical, position, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  4. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical, position, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation: (1) Those compounds, mixtures,...

  5. Systematic Instruction for Retarded Children: The Illinois Program. Part III: Self-Help Instruction.

    ERIC Educational Resources Information Center

    Linford, Maxine D.; And Others

    The manual for programed instruction of self care skills for trainable mentally handicapped children consists of dressing, dining, grooming, and toilet training. Teaching methods used include behavioral analysis and management, task analysis, and errorless learning. The lesson plans in each section are programed to maximize the child's success at…

  6. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2008-10

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2013

    2013-01-01

    This is the fourth biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information reported by states to the U.S. Department of Education regarding services…

  7. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2006-08

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2012

    2012-01-01

    This is the third biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information regarding the U.S. Department of Education's efforts to hold states accountable…

  8. WHO'S WHO III IN THE INTERAGENCY ENERGY/ENVIRONMENT R AND D PROGRAM

    EPA Science Inventory

    This directory provides a means of access to information on specific projects currently underway within the Interagency Program. The 14 major categories covered are: Characterization, measurement, and monitoring, Environmental transport processes, Health effects, Ecological effec...

  9. THE STANDARD CALIBRATION INSTRUMENT AUTOMATION SYSTEM FOR THE ATOMIC ABSORPTION SPECTROPHOTOMETER. PART III: PROGRAM DOCUMENTATION

    EPA Science Inventory

    This report contains complete documentation for the 15 programs and 11 data files of the EPA Atomic Absorption Instrument Automation System. The system incorporates the following major features: (1) multipoint calibration using first, second, or third degree regression or linear ...

  10. ORTEP-III: Oak Ridge Thermal Ellipsoid Plot Program for crystal structure illustrations

    SciTech Connect

    Burnett, M.N.; Johnson, C.K.

    1996-07-01

    This report describes a computer program for drawing crystal structure illustrations. Ball-and-stick type illustrations of a quality suitable for publication are produced with either spheres or thermal-motion probability ellipsoids on the atomic sites. The program can also produce stereoscopic pairs of illustrations which aid in the visualization of complex packing arrangements of atoms and thermal motion patterns. Interatomic distances, bond angles, and principal axes of thermal motion are also calculated to aid the structural study.

  11. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  12. 75 FR 73169 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... for Mileage 3. Analysis of and Responses to Public Comments a. Basis for Reconsideration of the... Quality Reporting System Measures (3) Summary of Comments and Responses i. The Final 2011 Physician... Initiative (PQRI) 3. Electronic Prescribing (eRx) Incentive Program X. Response to Comments XI....

  13. 77 FR 227 - Medicare Program; Payment Policies Under the Physician Fee Schedule, Five-Year Review of Work...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-04

    ... physician payment not previously identified. SUPPLEMENTARY INFORMATION: I. Background In FR Doc. 2011-28597 of November 28, 2011 (76 FR 73026), the final rule with comment period entitled ``Medicare Program.... Correction of Errors 0 In FR Doc. 2011-28597 of November 28, 2011 (76 FR 73026), the final rule with...

  14. A Study of Career Development, Learning Motivation, and Learning Satisfaction of Adult Learners in Unconventional Scheduling Graduate Programs

    ERIC Educational Resources Information Center

    Chu, Hui-Chin; Hsieh, Mei-Chi; Chang, Shan-Chih

    2007-01-01

    The study aimed at investigating the relationships among career development, learning motivation, and learning satisfaction of adult learners in master's programs at S University. Questionnaires were distributed with 211 valid returns (71%). The results indicated that some of the demographics are factors affecting both of the learners' learning…

  15. Model Early Childhood Learning Program, Baltimore, Maryland. Model Programs, Title III--Elementary and Secondary Education Act.

    ERIC Educational Resources Information Center

    National Center for Educational Communication (DHEW/NIE), Washington, DC.

    The purpose of the Model Early Childhood Learning Program of Baltimore, Md., City Schools is to provide experiences for disadvantaged children which will constitute the prerequisite developmental history needed to undertake first grade concepts and skills. The project's stated objectives are: (1) to improve the measured aptitude or readiness for…

  16. Project SOUL: Computer Training Program for High School Students from Disadvantaged Areas. Part III, The Scientific Programming Course. Technical Report.

    ERIC Educational Resources Information Center

    Lew, Art

    This report details the Scientific Programming Course that is a part of "Project SOUL." The course is intended for underprivileged high school juniors and seniors having an interest in mathematics or science and aspirations to attend college. The report is divided into three sections. In section I, the administration and operation of the course as…

  17. Arapahoe High School Variable Student Scheduling.

    ERIC Educational Resources Information Center

    Arapahoe County School District 6, Littleton, CO.

    This document describes the variable student scheduling program at Arapahoe High School in Littleton, a suburb of Denver, Colorado. Under this plan students have Monday-Wednesday-Friday classes and Tuesday-Thursday classes of approximately one hour. Four- and five-day-a-week classes are also scheduled. The program is now in its third year of…

  18. Evolutionary Scheduler for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  19. The Survey of College Marketing Programs. Volume III: Electronic Advertising and Marketing.

    ERIC Educational Resources Information Center

    Primary Research Group, Inc., New York, NY.

    This report presents 203 tables detailing findings concerning the use of electronic advertising within marketing programs at 68 colleges and universities. Highlights of this report include: colleges in the sample enroll a mean of 5,450 students; 5.6 percent of the colleges produce a CD-ROM version of the viewbook; 39.7 percent enable applicants to…

  20. Habilitation of the Severely and Profoundly Retarded: Volume III. Reports from the Specialized Training Program.

    ERIC Educational Resources Information Center

    Horner, Robert H., Ed.; Bellamy, G. Thomas, Ed.

    Sixteen papers concerned with vocational habilitation of the severely and profoundly retarded are organized into three parts: issues in habilitation, stimulus control of vocational behavior, and instrumentation for program evaluation. Papers have the following titles and authors: "Structured Employment: Productivity and Productive Capacity" (R.…

  1. Core III Materials for Rural Agriculture Programs. Units A-G.

    ERIC Educational Resources Information Center

    Courson, Roger L.; And Others

    This curriculum guide includes teaching packets for 12 areas of study to be included in a core curriculum for 11th-grade or third-year students enrolled in rural agricultural programs in Illinois. Each problem area includes some or all of the following components: suggestions to the teacher, teacher guide, competency inventory, information sheet,…

  2. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  3. Core III Materials for Metropolitan Agriculture/Horticulture Programs. Units A-I.

    ERIC Educational Resources Information Center

    Biondo, Ron; And Others

    This first volume of a two-volume curriculum guide contains 11 problem areas selected for study to be included in a core curriculum for 11th-grade or third-year students enrolled in a metropolitan agricultural program. The 11 problem areas are divided into eight units: Orientation to Agricultural Occupations (Gaining Employment), Supervised…

  4. Dance-based exercise program in rheumatoid arthritis. Feasibility in individuals with American College of Rheumatology functional class III disease.

    PubMed

    Noreau, L; Moffet, H; Drolet, M; Parent, E

    1997-01-01

    Many studies have demonstrated that aerobic exercise training is beneficial to prevent physical deconditioning in persons with rheumatoid arthritis (RA) without inducing adverse effects on individual's joints and general health. After significant results in individuals with RA (Functional Class I and II), the present study was conducted to demonstrate the feasibility of a modified dance-based exercise program to improve the physical fitness and psychological state of persons with RA (Class III). Ten (10) female subjects (mean age, 54 +/- 10 years) participated in an eight-week exercise program (twice weekly). Health status, use of medication, joint pain and swelling, cardiorespiratory fitness, activity of daily living, and psychological state were assessed before and after the training program. A high level of participation has been maintained by the participants (mean = 14.8/16 sessions). Most of them were able to perform a maximal exercise test on treadmill and reached 90% of the predicted heart rate at maximal exercise. No significant gain in aerobic power was observed for the group as a whole, but four subjects showed improvements of between 10% and 20% of their cardiorespiratory fitness. Positive changes in depression, anxiety, fatigue, and tension were observed after the eight-week exercise program. No deleterious effect on the health status was observed. These findings provide some evidences as to the feasibility of submitting individuals with RA to a modified dance-exercise program. Further studies, however, are required to determine the long-term effect of weight-bearing exercise on the health status of individuals with RA. PMID:9129516

  5. 29 CFR 1952.211 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual... occupational health program, July, 1975; (m) Fully implemented public employees program, December, 1975;...

  6. Energy Economic Data Base (EEDB) Program. Phase III. Final report and third update

    SciTech Connect

    Crowley, J. H.; Allen, R. E.; Aklu, G. L.; Benedict, R. G.; Brown, P. E.; Hodson, J. S.; Kaminski, R. S.; Lee, N. H.; Marda, R. S.; Martin, R. J.; Molin, A. T.; Smith, M. H.; Sosnowicz, E. J.; Valorie, C. M.; Woodhull, A. S.; Ziegler, E. J.

    1981-07-01

    The objective of the USDOE EEDB Program is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information of significance to the US Department of Energy. This information is intended to be used by USDOE in evauating and monitoring US civilian nuclear power programs, and to provide them with a consistent means of evaluating the nuclear option and proposed alternatives. The data tables, which make up the bulk of the report, are updated to January 1, 1980. The data in these tables and in the backup data file supercede the information presented in the Second Update (1979). Where required, new descriptive information is added in the text to supplement the data tables.

  7. Users Speak Out: A Look at Six Administrative Software Programs.

    ERIC Educational Resources Information Center

    Bruder, Isabelle

    1988-01-01

    Reviews six microcomputer-based administrative software programs that handle scheduling, grade reporting, and attendance tasks: (1) Alpha II, (2) Harts III, (3) Mount Castor, (4) The Osiris System, (5) The School System, and (6) STARS (Student Academic Records System). Companies producing the programs, systems they run on, and price information…

  8. The Oral History Program: III. Personal views of health sciences librarianship and the Medical Library Association.

    PubMed Central

    McKenzie, D; Pifalo, V

    1998-01-01

    The Medical Library Association Oral History Program uses accepted oral history techniques to collect and preserve interviews with members. The original taped interviews and transcripts are kept in the Medical Library Association archives and made available for research purposes; edited copies of the interviews are distributed through the National Network of Libraries of Medicine, and members are encouraged to borrow and read the histories. Summaries of forty-three interviews provide personal views on health sciences librarianship and the Medical Library Association. PMID:9803287

  9. Scheduling Reconsidered (Again!)

    ERIC Educational Resources Information Center

    Hentschke, Guilbert C.; Fowler, William J.

    1974-01-01

    Computer technicians bring to school scheduling a certain naivete regarding the operation of schools. School administrators play a fundamental role of informing technicians about education scheduling needs. (Author)

  10. Safety with Ocrelizumab in Rheumatoid Arthritis: Results from the Ocrelizumab Phase III Program

    PubMed Central

    Emery, Paul; Rigby, William; Tak, Paul P.; Dörner, Thomas; Olech, Ewa; Martin, Carmen; Millar, Laurie; Travers, Helen; Fisheleva, Elena

    2014-01-01

    Objective The objective was to determine the safety of ocrelizumab (OCR) in patients with rheumatoid arthritis (RA). Methods This was an analysis of the double-blind, placebo-controlled periods and long-term follow-up of 4 OCR phase III trials in RA (SCRIPT, STAGE, FILM and FEATURE). Safety data per study and the results of a meta-analysis of serious infectious events (SIEs) are presented. Results Overall, 868 patients received placebo, 1064 patients OCR 200 mg×2 (or 400 mg×1) (OCR200), and 827 patients OCR 500 mg×2 (OCR500) plus background methotrexate (MTX) at baseline and 24 weeks. During the double-blind, placebo-controlled periods, the incidence of adverse events and serious adverse events was comparable between the OCR+MTX and placebo +MTX groups. Infusion-related reactions were more common with OCR+MTX and decreased in frequency with subsequent infusions. Serious infusion-related reactions were rare (0.1%). Serious infections occurred more frequently with OCR500+MTX. In the meta-analysis, a statistically significant difference from placebo +MTX in incidence of SIEs per 100 patient-years of 2.4 (95% CI, 0.3–4.5) was observed with OCR500+MTX, but not with OCR200+MTX (0.6; 95% CI, −1.3 to 2.4). Patients recruited in Asia exhibited a higher risk of serious infections (hazard ratio, 1.78; 95% CI, 1.03–3.06). The incidence of human anti-human antibodies was <5%. Long-term follow-up indicated no differences in malignancy rates between the treatment groups. There was no apparent difference in time to B-cell repletion between the OCR dose groups. Conclusions In placebo-controlled clinical trials of RA, OCR500+MTX was associated with a higher risk of serious infections compared with placebo +MTX. The safety profile of OCR 200+MTX was comparable with placebo+MTX. Trial Registration STAGE Clinical Trials.gov NCT00406419 SCRIPT Clinical Trials.gov NCT00476996 FILM Clinical Trials.gov NCT00485589 FEATURE Clinical Trials.gov NCT00673920 PMID:24498318

  11. The Stratospheric Aerosol and Gas Experiment III instrument proposed for EOS - A conceptual design

    NASA Technical Reports Server (NTRS)

    Mauldin, L. E.; Mccormick, M. P.; Zawodny, J. M.; Mcmaster, L. R.; Chu, W. P.; Gustafson, J. C.; Maddrea, G. L.

    1989-01-01

    This paper describes the Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument proposed for the Earth Observing System (EOS), which is designed to monitor the vertical distribution of stratospheric aerosols, ozone, water vapor, nitrogen dioxide, and temperature by measuring the extinction and scattering of solar radiation in the 03 to 1.6 micron range through the atmosphere. The SAGE III employs proven concepts which have evolved from the SAM II, SAGE, and SAGE II programs. The launch is scheduled for the summer of 1996. The SAGE II block diagram is included.

  12. The Research Program at RIBRAS (Radioactive Ion Beams in Brasil)-III

    SciTech Connect

    Lichtenthaeler, R.; Lepine-Szily, A.; Guimaraes, V.; Faria, P. N. de; Mendes, D. R. Jr; Pires, K. C. C.; Morcelle, V.; Barioni, A.; Morais, M. C.; Pampa Condori, R.; Assuncao, M.; Moro, A. M.; Rodriguez-Gallardo, M.; Arazi, A.

    2010-04-30

    A part of the research program developed in the RIBRAS facility over the last four years is presented. Experiments using radioactive secondary beams of light exotic nuclei such as {sup 6}He, {sup 7}Be, {sup 8}Li on several targets have been performed. Elastic angular distributions have been analysed by the Optical Model and four body Continuous Discretized Coupled Channels Calculations (4b-CDCC) and the total reaction cross sections have been obtained. A comparison between the reaction cross sections of {sup 6}He and other stable projectiles with medium-heavy targets was performed. Measurements of the proton transfer reaction {sup 12}C({sup 8}Li,{sup 9}Be){sup 11}B are also presented.

  13. Adaptive properties of living beings: proposal for a generic mechanism. (Self-programming machines III).

    PubMed

    Moulin, Jean-Paul

    2006-03-01

    Living systems are capable to have appropriate responses to unpredictable environment. This kind of self-organization seems to operate as a self-programming machine, i.e. an organization able to modify itself. Until now the models of self-organization of living beings proposed are functions solutions of differential systems or transition functions of automata. These functions are fixed and these models are therefore unable to modify their organization. On the other hand, computer science propose a lot of models having the properties of adaptive systems of living beings, but all these models depend on the comparison between a goal and the results and ingenious choices of parameters by programmers, whereas there are no programmer's intention nor choice in the living systems. From two best known examples of adaptive systems of living beings, nervous system and immune system that have in common that the external signals modify the rewriting of their organization and therefore work as self-organizing machines, we devised machines with a finite set of inputs, based upon a recurrence, are able to rewrite their organization (Self-programming machines or m(sp)) whenever external conditions vary and have striking properties of adaptation. M(sp) have similar properties whatever the operation defining the recurrence maybe. These results bring us to make the following statement: adaptive properties of living systems can be explained by their ability to rewrite their organization whenever external conditions vary under the only assumption that the rewriting mechanism be a deterministic constant recurrence in a finite state set. PMID:16545754

  14. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  15. Medicare program; revisions to payment policies under the physician fee schedule for calendar year 2006 and certain provisions related to the Competitive Acquisitions Program of outpatient drugs and biologicals under Part B. Final rule with comment.

    PubMed

    2005-11-21

    This rule addresses Medicare Part B payment policy, including the physician fee schedule that are applicable for calendar year (CY) 2006; and finalizes certain provisions of the interim final rule to implement the Competitive Acquisition Program (CAP) for Part B Drugs. It also revises Medicare Part B payment and related policies regarding: Physician work; practice expense (PE) and malpractice relative value units (RVUs); Medicare telehealth services; multiple diagnostic imaging procedures; covered outpatient drugs and biologicals; supplemental payments to Federally Qualified Health Centers (FQHCs); renal dialysis services; coverage for glaucoma screening services; National Coverage Decision (NCD) timeframes; and physician referrals for nuclear medicine services and supplies to health care entities with which they have financial relationships. In addition, the rule finalizes the interim RVUs for CY 2005 and issues interim RVUs for new and revised procedure codes for CY 2006. This rule also updates the codes subject to the physician self-referral prohibition and discusses payment policies relating to teaching anesthesia services, therapy caps, private contracts and opt-out, and chiropractic and oncology demonstrations. As required by the statute, it also announces that the physician fee schedule update for CY 2006 is -4.4 percent, the initial estimate for the sustainable growth rate for CY 2006 is 1.7 percent and the conversion factor for CY 2006 is $36.1770. PMID:16299947

  16. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2004-06

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2008

    2008-01-01

    The biennial report to Congress on the implementation of the Title III state formula grant program provides a snapshot of the status of the U.S. Department of Education's efforts to hold states accountable for ensuring that all limited English proficient (LEP) students attain English language proficiency (ELP) and are achieving in the content…

  17. Helping General Physical Educators and Adapted Physical Educators Address the Office of Civil Rights Dear Colleague Guidance Letter: Part III--Practitioners and Programs

    ERIC Educational Resources Information Center

    Poulin, David; Martinez, David; Aenchbacher, Amy; Aiello, Rocco; Doyle, Mike; Hilgenbrinck, Linda; Busse, Sean; Cappuccio, Jim

    2013-01-01

    In Part III of the feature, physical educators and adapted physical educators offer current best practices as models of implementation for readers. Contributions included are: (1) Answer to the Dear Colleague Letter from the Anchorage School District's Adapted Sport Program (David Poulin); (2) Georgia's Adapted Physical Educators…

  18. ASBESTOS CONTAINING MATERIALS IN SCHOOL BUILDINGS: BULK SAMPLE ANALYSIS QUALITY ASSURANCE PROGRAM. BULK SAMPLE ROUNDS 12, 13 AND BLIND ROUND III

    EPA Science Inventory

    The report presents the results of laboratories participating in the twelveth, thirteenth and third (III) blind round of the bulk sample analysis quality assurance program sponsored by the U.S. Environmental Protection Agency. Three hundred twenty-three, 386 and 51 laboratories w...

  19. A Standardized Certification Program for Case Managers Serving Frail Elderly Texans. Module III: Implementation, Monitoring, Reassessment & Care Plan Adjustment, Closure, and Evaluation.

    ERIC Educational Resources Information Center

    Lusky, Richard A.; And Others

    This learning module is one of three training modules that were developed for members of the Texas Gerontological Consortium for Continuing Education to use in preparing case managers working in human service professions coordinating community-based programs for frail elderly Texans. Module III deals with the following topics: implementation (case…

  20. SUPERSTARS III: K-2.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  1. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule risk assessments determine the likelihood of finishing on time. Each task in a schedule has a varying degree of probability of being finished on time. A schedule risk assessment quantifies these probabilities by assigning values to each task. This viewgraph presentation contains a flow chart for conducting a schedule risk assessment, and profiles applicable several methods of data analysis.

  2. The Block Scheduling Handbook.

    ERIC Educational Resources Information Center

    Queen, J. Allen

    Block scheduling encourages increased comprehensive immersion into subject matter, improved teacher-student relationships, and decreased disciplinary problems. While block scheduling may offer many advantages, moving to a block schedule from conventional scheduling can be a major adjustment for both students and teachers. This guide is intended to…

  3. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  4. Innovative integration of decommissioning and deactivation program with soil-groundwater clean up program has positive results on budget and schedule: a case study

    SciTech Connect

    Schappell, Bruce G.; Rucker, Gregory G.

    2007-07-01

    An innovative approach to integrate the activities of a decommissioning and deactivation program (D and D) with a soil-groundwater clean up program has had significant positive results saving both money and time at the Department of Energy's Savannah River Site. The accomplishments that have been achieved by the combining the two programs have been remarkable including significant cost savings, economies of scale for sampling and document generation, and alignment of common objectives. Because of the coordination of both activities area-wide 'end states' can be formulated and be consistent with the customers' cleanup goals and federal regulations. This coordinates and aligns both the environmental clean up and D and D objectives because each must be addressed simultaneously and comprehensively. In this respect, resources from both organizations can be pooled to take advantage of the strengths of each. The new approach allows more efficient use of lean financial resources and optimizes workforce activities to attain the common objectives while being more cost effective, more protective of the environment, and optimizing the use existing resources. (authors)

  5. Innovative Integration of Decommissioning and Deactivation Program with Soil-Groundwater Clean Up Program Has Positive Results on Budget and Schedule: A Case Study

    SciTech Connect

    Schappell, B; Rucker, G

    2007-07-25

    An innovative approach to integrate the activities of a decommissioning and deactivation program (D&D) with a soil-groundwater clean up program has had significant positive results saving both money and time at the Department of Energy's Savannah River Site. The accomplishments that have been achieved by the combining the two programs have been remarkable including significant cost savings, economies of scale for sampling and document generation, and alignment of common objectives. Because of the coordination of both activities area-wide ''end states'' can be formulated and be consistent with the customers' cleanup goals and federal regulations. This coordinates and aligns both the environmental clean up and D&D objectives because each must be addressed simultaneously and comprehensively. In this respect, resources from both organizations can be pooled to take advantage of the strengths of each. The new approach allows more efficient use of lean financial resources and optimizes workforce activities to attain the common objectives while being more cost effective, more protective of the environment, and optimizing the use existing resources.

  6. Simplifying Facility and Event Scheduling: Saving Time and Money.

    ERIC Educational Resources Information Center

    Raasch, Kevin

    2003-01-01

    Describes a product called the Event Management System (EMS), a computer software program to manage facility and event scheduling. Provides example of the school district and university uses of EMS. Describes steps in selecting a scheduling-management system. (PKP)

  7. Optimizing Operating Room Scheduling.

    PubMed

    Levine, Wilton C; Dunn, Peter F

    2015-12-01

    This article reviews the management of an operating room (OR) schedule and use of the schedule to add value to an organization. We review the methodology of an OR block schedule, daily OR schedule management, and post anesthesia care unit patient flow. We discuss the importance of a well-managed OR schedule to ensure smooth patient care, not only in the OR, but throughout the entire hospital. PMID:26610624

  8. Integrated online job-shop scheduling system

    NASA Astrophysics Data System (ADS)

    Zhao, Xing; Chen, Kuan H.; Luh, Peter B.; Chiueh, T. D.; Chang, ShihChang; Thakur, Lakshman S.

    1999-11-01

    The rapid development of information technology and e- commerce requires fast response form scheduling systems. Based on the Lagrangian relaxation approach for job shop scheduling, this paper present an integrated system that will generate schedules quickly. The Lagrangian relaxation approach is an iterative optimization process, where dynamic programming is solved in each iteration. Since dynamic programming is computational expensive especially for large problems, this paper develops the simplified dynamic programming, which will cut the computation time of each iteration by one order. Furthermore, a digital circuit to be embedded in PC is designed to implement the iterative optimization algorithm, leading to another order of speed improvement. The resulting integrated scheduling system consists of the hardware for optimization and the related software. It is estimated that two orders of magnitude gain in speed can be obtained, which will make on-line scheduling for practical job shops possible.

  9. 40 CFR 52.1677 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Compliance schedules. 52.1677 Section 52.1677 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New York § 52.1677 Compliance schedules. (a) The requirements of § 51.261 of...

  10. A Heuristic Approach to Scheduling University Timetables.

    ERIC Educational Resources Information Center

    Loo, E. H.; And Others

    1986-01-01

    Categories of facilities utilization and scheduling requirements to be considered when using a heuristic approach to timetabling are described together with a nine-step algorithm and the computerized timetabling system, Timetable Schedules System (TTS); TTS utilizes heuristic approach. An example demonstrating use of TTS and a program flowchart…

  11. Scheduling Sanity in the Elementary Schools.

    ERIC Educational Resources Information Center

    Curatilo, Joseph S.

    1983-01-01

    Use of the music block schedule for elementary band, chorus, and orchestra programs has many advantages. For example, it eliminates the need to pull students from class and abates classroom teacher and music teacher friction. Solutions to other problems often encountered in scheduling are also discussed. (RM)

  12. 40 CFR 58.12 - Operating schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Operating schedules. 58.12 Section 58.12 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.12 Operating schedules. State and local governments shall collect ambient air quality data...

  13. 40 CFR 52.576 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.576 Section 52.576 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Georgia § 52.576 Compliance schedules. (a) (b)...

  14. 40 CFR 52.576 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.576 Section 52.576 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Georgia> § 52.576 Compliance schedules. (a) (b)...

  15. 40 CFR 52.576 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.576 Section 52.576 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Georgia> § 52.576 Compliance schedules. (a) (b)...

  16. 40 CFR 52.576 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.576 Section 52.576 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Georgia § 52.576 Compliance schedules. (a) (b)...

  17. 40 CFR 52.576 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.576 Section 52.576 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Georgia § 52.576 Compliance schedules. (a) (b)...

  18. 40 CFR 52.778 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.778 Section 52.778 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Indiana § 52.778 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...

  19. 40 CFR 52.825 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.825 Section 52.825 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Iowa § 52.825 Compliance schedules. (a) (b) Regulation for increments of progress. (1) Except...

  20. 6 CFR 27.210 - Submissions schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Submissions schedule. 27.210 Section 27.210 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.210 Submissions schedule. (a) Initial Submission....

  1. Streams-C Scheduler and Library

    Energy Science and Technology Software Center (ESTSC)

    2001-12-04

    The scheduler accepts a preprocessed C program with optional Streams-C extensions. It translates it to a normalized form with additional information for scheduling it on a reconfigurable architecture. The resulting file is accepted by the Streams-C VHDL generator, not part of this package.

  2. 76 FR 54408 - Regulatory Review Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    .... (76 FR 18457, April 4, 2011). The Commission's regulatory review process established a tribal... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule AGENCY: National Indian..., 1441 L Street, NW., Suite 9100, Washington, DC 20005. Telephone: 202-632-7003; e-mail:...

  3. 76 FR 33181 - Regulatory Review Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... processes. (76 FR 18457, April 4, 2011). The Commission's regulatory review process establishes a detailed... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule AGENCY: National Indian... Notice of Consultation advising the public that the NIGC was conducting a comprehensive review of all...

  4. 76 FR 26967 - Regulatory Review Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule AGENCY: National Indian... advising the public that the NIGC was conducting a comprehensive review of its regulations and requesting public comment on the process for conducting the regulatory review. On April 4, 2011, after holding...

  5. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  6. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R.; Eckert, Philip D.; Hommes, Gregg

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  7. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  8. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  9. Clean Air Act Title III accidental emission release risk management program, and how it applies to landfills

    SciTech Connect

    Hibbard, C.S.

    1999-07-01

    On June 20, 1996, EPA promulgated regulations pursuant to Title III of the Clean Air Act (CAA) Amendments of 1990 (Section 112(r)(7) of the CAA). The rule, contained in 40 CFR Part 68, is called Accidental Release Prevention Requirements: Risk Management Programs, and is intended to improve accident prevention and emergency response practices at facilities that store and/or use hazardous substances. Methane is a designated highly hazardous chemical (HHC) under the rule. The rule applies to facilities that have 10,000 pounds of methane or more in any process, roughly equivalent to about 244,000 cubic feet of methane. The US EPA has interpreted this threshold quantity as applying to landfill gas within landfills. This paper presents an overview of the Accidental Release Prevention regulations, and how landfills are affected by the requirements. This paper describes methodologies for calculating the threshold quantity of landfill gas in a landfill. Methane is in landfill gas as a mixture. Because landfill gas can burn readily, down to concentrations of about five percent methane, the entire landfill gas mixture must be treated as the regulated substance, and counts toward the 10,000-pound threshold. It is reasonable to assume that the entire landfill gas collection system, active or passive, is filled with landfill gas, and that a calculation of the volume of the system would be a calculation of the landfill gas present in the process on the site. However, the US EPA has indicated that there are some instances in which pore space gas should be included in this calculation. This paper presents methods available to calculate the amount of pore space gas in a landfill, and how to determine how much of that gas might be available for an explosion. The paper goes through how to conduct the release assessment to determine the worst-case hazard zone around the landfill.

  10. The Basic Program of Vocational Agriculture in Louisiana. Ag I and Ag II (9th and 10th Grades). Volume III. Bulletin 1690-III.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    This curriculum guide, the third volume of the series, outlines the basic program of vocational agriculture for Louisiana students in the ninth and tenth grades. Covered in the five units on plant science are growth processes of plants, cultural practices for plants, insects affecting plants, seed and plant selection, and diseases that affect…

  11. Immunization Schedules for Adults

    MedlinePlus

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Adults in Easy-to-read Formats ... previous immunizations. View or Print a Schedule Recommended Immunizations for Adults (19 Years and Older) by Age ...

  12. Childhood Immunization Schedule

    MedlinePlus

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  13. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

  14. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  15. Parallel scheduling algorithms

    SciTech Connect

    Dekel, E.; Sahni, S.

    1983-01-01

    Parallel algorithms are given for scheduling problems such as scheduling to minimize the number of tardy jobs, job sequencing with deadlines, scheduling to minimize earliness and tardiness penalties, channel assignment, and minimizing the mean finish time. The shared memory model of parallel computers is used to obtain fast algorithms. 26 references.

  16. Block Scheduling. Research Brief

    ERIC Educational Resources Information Center

    Muir, Mike

    2003-01-01

    What are the effects of block scheduling? Results of transitioning from traditional to block scheduling are mixed. Some studies indicate no change in achievement results, nor change in teachers' opinions about instructional strategies. Other studies show that block scheduling doesn't work well for Advanced Placement or Music courses, that "hard to…

  17. Gang scheduling a parallel machine. Revision 1

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  18. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  19. Block Scheduling: Innovations with Time. Themes in Education Series.

    ERIC Educational Resources Information Center

    Northeast and Islands Regional Educational Lab. at Brown Univ., Providence, RI.

    This booklet provides information about block scheduling--its advantages and drawbacks. Schools can use it as a discussion tool to improve their use of time by reformulating student and teacher schedules. The booklet can help educators choose a block scheduling program that will suit their school. The booklet explains the purpose of block…

  20. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101...

  1. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an... 49 Transportation 4 2014-10-01 2014-10-01 false Scheduling of bridge inspections. 237.101...

  2. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an... 49 Transportation 4 2013-10-01 2013-10-01 false Scheduling of bridge inspections. 237.101...

  3. AVLIS production plant project schedule and milestones

    SciTech Connect

    Not Available

    1984-11-15

    An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

  4. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  5. Iterative modulo scheduling

    SciTech Connect

    Rau, B.R.

    1996-02-01

    Modulo scheduling is a framework within which algorithms for software pipelining innermost loops may be defined. The framework specifies a set of constraints that must be met in order to achieve a legal modulo schedule. A wide variety of algorithms and heuristics can be defined within this framework. Little work has been done to evaluate and compare alternative algorithms and heuristics for modulo scheduling from the viewpoints of schedule quality as well as computational complexity. This, along with a vague and unfounded perception that modulo scheduling is computationally expensive as well as difficult to implement, have inhibited its corporation into product compilers. This paper presents iterative modulo scheduling, a practical algorithm that is capable of dealing with realistic machine models. The paper also characterizes the algorithm in terms of the quality of the generated schedules as well as the computational incurred.

  6. Predicting scheduling success

    NASA Technical Reports Server (NTRS)

    Messing, Fredric

    1993-01-01

    This paper provides an analytical formulation to predict scheduling success for a class of problems frequently referred to as activity scheduling. Space Network communications scheduling is an example of activity scheduling. The principal assumption is that the activity start times are randomly distributed over the available time in the time line. The formulation makes it possible to estimate how much of the demand can be scheduled as a function of the demand, number of resources, activity duration, and activity flexibility. The paper includes computed results for a variety of resource and demand conditions. The results demonstrate that even with highly flexible activities, it is difficult to schedule demand greater than 60 percent of resources without the use of optimization and conflict resolution capabilities in the scheduling system.

  7. SCHOOL SCHEDULING BY COMPUTER, THE STORY OF GASP.

    ERIC Educational Resources Information Center

    MURPHY, JUDITH; SUTTER, ROBERT

    GENERALIZED ACADEMIC SIMULATION PROGRAMS (GASP) IS SCHOOL SCHEDULING BY COMPUTER. THE PUBLICATION COMPARES THE MANUAL METHOD OF DEVELOPING A SCHOOL SCHEDULE WITH THE NEW METHOD OF COMPUTER PROGRAMING. A MAJOR ADVANTAGE OF COMPUTER PROGRAMING IS THAT IT RELIEVES THE ADMINISTRATOR OF THIS BUSY WORK SO THAT HE CAN DEVOTE HIS ENERGIES AND TIME TO MORE…

  8. School Scheduling by Computer, the Story of GASP.

    ERIC Educational Resources Information Center

    Murphy, Judith; Sutter, Robert

    Generalized academic simulation programs (GASP) is school scheduling by computer. The publication compares the manual method of developing a school schedule with the new method of computer programing. A major advantage of computer programing is that it relieves the administrator of this busy work so that he can devote his energies and time to more…

  9. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    ERIC Educational Resources Information Center

    Soreth, Michelle Ennis; Hineline, Philip N.

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to…

  10. 17 CFR 210.7-05 - What schedules are to be filed.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (17 CFR 210) Article 8 Financial Statements of Smaller Reporting Companies Source: 73 FR 953, Jan. 4... balance sheet for each person or group. (2) The schedules specified below in this section as Schedule IV... each person or group. (3) Schedules II, III and V shall be filed as of the date and for...

  11. The Quality of Student Experiences in Traditionally Scheduled Courses versus Block Scheduled Courses at Pearl River Community College

    ERIC Educational Resources Information Center

    Alsobrooks, David Scott

    2010-01-01

    The purpose of this study was to determine if students at Pearl River Community College (PRCC) achieve significantly different self-reported Quality of Effort levels when enrolled in block scheduled programs than students enrolled in traditionally scheduled programs. This study focuses on Career and Technical Education (CTE) programs at PRCC in…

  12. The EUVE proposal database and scheduling system

    NASA Technical Reports Server (NTRS)

    Christian, C.; Olson, E.; Jelinsky, P.; Samuel, M.

    1992-01-01

    The proposal database and scheduling system for the Extreme Ultraviolet Explorer will be described. The proposal database has been implemented to take input for approved observations selected by the EUVE Peer Review Panel and output target information suitable for the scheduling system to digest. The scheduling system is a hybrid of the SPIKE program and EUVE software which checks spacecraft constraints, produces a proposed schedule and selects spacecraft orientations with optimal configurations for acquiring star trackers, etc. This system has been used to schedule the In Orbit Calibration activities that took place this summer, following the EUVE launch in early June 1992. The implemented strategy has implications for the selection of approved targets, which have impacted the Peer Review process. In addition, it will be discussed how the proposal database, founded on Sybase, controls the processing of EUVE Guest Observer data.

  13. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  14. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  15. Space station payload operations scheduling with ESP2

    NASA Technical Reports Server (NTRS)

    Stacy, Kenneth L.; Jaap, John P.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.

  16. A scheduling model for astronomy

    NASA Astrophysics Data System (ADS)

    Solar, M.; Michelon, P.; Avarias, J.; Garces, M.

    2016-04-01

    Astronomical scheduling problem has several external conditions that change dynamically at any time during observations, like weather condition (humidity, temperature, wind speed, opacity, etc.), and target visibility conditions (target over the horizon, Sun/Moon blocking the target). Therefore, a dynamic re-scheduling is needed. An astronomical project will be scheduled as one or more Scheduling Blocks (SBs) as an atomic unit of astronomical observations. We propose a mixed integer linear programming (MILP) solution to select the best SBs, favors SBs with high scientific values, and thus maximizing the quantity of completed observation projects. The data content of Atacama Large Millimeter/Submillimeter Array (ALMA) projects of cycle 0 and cycle 1 were analyzed, and a synthetic set of tests of the real instances was created. Two configurations, one of 5000 SBs in a 3 months season and another 10,000 SBs a 6 months season were created. These instances were evaluated with excellent results. Through the testing it is showed that the MILP proposal has optimal solutions.

  17. Flexible shift scheduling of physicians.

    PubMed

    Brunner, Jens O; Bard, Jonathan F; Kolisch, Rainer

    2009-09-01

    This research addresses a shift scheduling problem in which physicians at a German university hospital are assigned to demand periods over a planning horizon that can extend up to several weeks. When performing the scheduling it is necessary to take into account a variety of legal and institutional constraints that are imposed by a national labor agreement, which governs all physicians in German university hospitals. Currently, most medical departments develop their staff schedules manually at great cost and time. To solve the problem, a new modeling approach is developed that requires shifts to be generated implicitly. Rather than beginning with a predetermined number of shift types and start times, shifts are allowed to start at every pre-defined period in the planning horizon and extend up to 13 h with an hour-long break included. The objective is to find an assignment such that the total hours that have to be paid out as overtime are minimal under the restrictions given by the labor agreement. The problem is formulated as a mixed-integer program and solved with CPLEX. During the solution process individual lines-of-work are constructed for each physician. Using data from an anesthesia department, computational results indicate that high quality schedules can be obtained much more quickly than by current practice. PMID:19739361

  18. The range scheduling aid

    NASA Technical Reports Server (NTRS)

    Halbfinger, Eliezer M.; Smith, Barry D.

    1991-01-01

    The Air Force Space Command schedules telemetry, tracking and control activities across the Air Force Satellite Control network. The Range Scheduling Aid (RSA) is a rapid prototype combining a user-friendly, portable, graphical interface with a sophisticated object-oriented database. The RSA has been a rapid prototyping effort whose purpose is to elucidate and define suitable technology for enhancing the performance of the range schedulers. Designing a system to assist schedulers in their task and using their current techniques as well as enhancements enabled by an electronic environment, has created a continuously developing model that will serve as a standard for future range scheduling systems. The RSA system is easy to use, easily ported between platforms, fast, and provides a set of tools for the scheduler that substantially increases his productivity.

  19. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  20. Automated telescope scheduling

    NASA Astrophysics Data System (ADS)

    Johnston, Mark D.

    1988-08-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  1. Detailed leak detection test plan and schedule for the Oak Ridge National Laboratory LLLW active tanks. Waste Management and Environmental Restoration Programs

    SciTech Connect

    Douglas, D.G.; Maresca, J.W. Jr.

    1993-03-01

    This document provides a detailed leak detection test plan and schedule for leak testing many of the tanks that comprise the active portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement (FFA) between the US Department of Energy (DOE) and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC).

  2. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  3. Monitoring Building Systems for Schedule Compliance

    SciTech Connect

    Jensen, Andrew M.; Belew, Shan T.

    2013-02-19

    As Pacific Northwest National Laboratory (PNNL) initiated a Core Business Hours program, it became a challenge to ensure that the hundreds of systems campus wide were operating within their programmed schedules. Therefore, a collaborative exchange between PNNL operations and PNNL researchers developing the Decision Support for Operations and Maintenance (DSOM) software package was initiated to create a tool to solve this problem. This new DSOM tool verifies systems are operating within scheduled operation times by polling Building Automation and Control Network (BACnet) identifiers of systems’ on/off or command statuses. The tool records the time spent in operation state (ON) and totalizes each system over a rolling 7-day period, highlighting systems that are running over the scheduled hours. This snapshot view allows building management to look quickly at the entire campus to ensure that systems are not operating beyond their scheduled hours.

  4. Intelligent scheduling support for the US Coast Guard

    SciTech Connect

    Darby-Dowman, K.; Lucas, C.; Mitra, G.; Fink, R.; Kingsley, L.; Smith, J.W.

    1992-12-31

    This paper will discuss a joint effort by the U.S. Coast Guard Research & Development Center, Idaho National Engineering Laboratory and Brunel University to provide the necessary tools to increase the human scheduler`s capability to handle the scheduling process more efficiently and effectively. Automating the scheduling process required a system that could think independently of the scheduler, that is, the systems needed its own control mechanism and knowledge base. Further, automated schedule generation became a design requirement and sophisticated algorithms were formulated to solve a complex combinatorial problem. In short, the resulting design can be viewed as a hybrid knowledge-based mathematical programming application system. This document contains an overview of the integrated system, a discrete optimization model for scheduling, and schedule diagnosis and analysis.

  5. Request Generation 2 mission planning and scheduling

    NASA Technical Reports Server (NTRS)

    Greenhut, Darlene D.

    1991-01-01

    Request Generation II (ReGe II) is a PC-based prototype knowledge based system intented to assist USAF personnel in planning and scheduling satellite operations for their Mission Control Complexes (MCC). It aids MCC personnel in producing weekly Program Action Plans (PAPs) for each of the satellite vehicles an MCC is responsible for monitoring and maintaining. The PAPs are input to the Resource Control Complex (RCC) which schedules all satellite support requests for usage of the network.

  6. School Community Education Program in New York City, 1984-85. Volume III: OEA Final Evaluation Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In 1984-85, the New York City Public Schools received $2,374,686 from the state legislature to operate the School Community Education Program (also known as the Umbrella Program). The program consisted of 46 different projects designed to provide innovative solutions to local educational and school problems. Thirteen of these projects are…

  7. Inventory of Bilingual Education Provisions in State Legislation. Study of State Programs in Bilingual Education, Supporting Volume III.

    ERIC Educational Resources Information Center

    Development Associates, Inc., Washington, DC.

    A review and analysis was conducted of state programs in bilingual education for the purpose of describing authorizing legislation, identifying program goals, objectives and mandated or prohibited approaches or practices; defining program requirements for staff qualifications, training activities, materials development and technology and…

  8. ACRIM III

    Atmospheric Science Data Center

    2015-12-30

    ACRIM III Data and Information Active Cavity Radiometer Irradiance ... the ACRIMSAT spacecraft on December 20, 1999. ACRIM III data are reprocessed every 90 days to utilize instrument recalibration.   ... ACRIM III Instrument Team Page ACRIM II Data Sets SCAR-B Block:  SCAR-B Products ...

  9. Range Scheduling Aid (RSA)

    NASA Technical Reports Server (NTRS)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  10. Surviving Block Scheduling.

    ERIC Educational Resources Information Center

    Haley, Marjorie

    A discussion of block scheduling for second language instruction looks at the advantages and disadvantages and offers some suggestions for classroom management and course organization. It is argued that block scheduling may offer a potential solution to large classes, insufficient time for labs, too little individualized instruction; few…

  11. Block Scheduling Revisited.

    ERIC Educational Resources Information Center

    Queen, J. Allen

    2000-01-01

    Successful block scheduling depends on provision of initial and ongoing instructional training. Teaching strategies should vary and include cooperative learning, the case method, the socratic seminar, synectics, concept attainment, the inquiry method, and simulations. Recommendations for maximizing block scheduling are outlined. (Contains 52…

  12. A Fluid Block Schedule

    ERIC Educational Resources Information Center

    Ubben, Gerald C.

    1976-01-01

    Achieving flexibility without losing student accountability is a challenge that faces every school. With a fluid block schedule, as described here, accountability is maintained without inhibiting flexibility. An additional advantage is that three levels of schedule decision making take some of the pressure off the principal. (Editor)

  13. Scheduling: Seven Period Day

    ERIC Educational Resources Information Center

    Williamson, Ronald

    2010-01-01

    Driven by stable or declining financial resources many school districts are considering the costs and benefits of a seven-period day. While there is limited evidence that any particular scheduling model has a greater impact on student learning than any other, it is clear that the school schedule is a tool that can significantly impact teacher…

  14. Trimester Schedule. Research Brief

    ERIC Educational Resources Information Center

    Education Partnerships, Inc., 2012

    2012-01-01

    Why do a trimester schedule? With the advent of block scheduling, many high schools conducted research on utilizing that plan in a trimester format. There appeared to be three issues that most schools faced: (1) How to provide substantive instructional time that was not fragmented?; (2) How does the school climate contribute positively to…

  15. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., 1977. (m) An inspection scheduling system will be developed for the health program within 6 months of... consultation programs will be fully staffed by FY 1979. (g) An automated Management Information System, including a court reporting system, will be developed within 6 months of plan approval. (h)...

  16. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.

    1997-04-01

    To provide an updated summary of the status of irradiation experiments for the neutron-interactive materials program. The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has two irradiation experiments in reactor; and 8 experiments in the planning or design stages. Postirradiation examination and testing is in progress on 18 experiments.

  17. Mixed-Integer Formulations for Constellation Scheduling

    NASA Astrophysics Data System (ADS)

    Valicka, C.; Hart, W.; Rintoul, M.

    Remote sensing systems have expanded the set of capabilities available for and critical to national security. Cooperating, high-fidelity sensing systems and growing mission applications have exponentially increased the set of potential schedules. A definitive lack of advanced tools places an increased burden on operators, as planning and scheduling remain largely manual tasks. This is particularly true in time-critical planning activities where operators aim to accomplish a large number of missions through optimal utilization of single or multiple sensor systems. Automated scheduling through identification and comparison of alternative schedules remains a challenging problem applicable across all remote sensing systems. Previous approaches focused on a subset of sensor missions and do not consider ad-hoc tasking. We have begun development of a robust framework that leverages the Pyomo optimization modeling language for the design of a tool to assist sensor operators planning under the constraints of multiple concurrent missions and uncertainty. Our scheduling models have been formulated to address the stochastic nature of ad-hoc tasks inserted under a variety of scenarios. Operator experience is being leveraged to select appropriate model objectives. Successful development of the framework will include iterative development of high-fidelity mission models that consider and expose various schedule performance metrics. Creating this tool will aid time-critical scheduling by increasing planning efficiency, clarifying the value of alternative modalities uniquely provided by multi-sensor systems, and by presenting both sets of organized information to operators. Such a tool will help operators more quickly and fully utilize sensing systems, a high interest objective within the current remote sensing operations community. Preliminary results for mixed-integer programming formulations of a sensor scheduling problem will be presented. Assumptions regarding sensor geometry

  18. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  19. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  20. Transportation Baseline Schedule

    SciTech Connect

    Fawcett, Ricky Lee; John, Mark Earl

    2000-01-01

    The “1999 National Transportation Program - Transportation Baseline Report” presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste/material transportation. The companion “1999 Transportation ‘Barriers’ Analysis” analyzes the data and identifies existing and potential problems that may prevent or delay transportation activities based on the data presented. The “1999 Transportation Baseline Schedule” (this report) uses the same data to provide an overview of the transportation activities of DOE EM waste/materials. This report can be used to identify areas where stakeholder interface is needed, and to communicate to stakeholders the quantity/schedule of shipments going through their area. Potential bottlenecks in the transportation system can be identified; the number of packages needed, and the capacity needed at receiving facilities can be planned. This report offers a visualization of baseline DOE EM transportation activities for the 11 major sites and the “Geologic Repository Disposal” site (GRD).

  1. 40 CFR 122.47 - Schedules of compliance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Schedules of compliance. 122.47 Section 122.47 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Conditions § 122.47 Schedules of compliance. (a) General...

  2. A survey of planning and scheduling research at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1988-01-01

    NASA Ames Research Center has a diverse program in planning and scheduling. This paper highlights some of our research projects as well as some of our applications. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

  3. A survey of planning and scheduling research at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1989-01-01

    NASA Ames Research Center has a diverse program in planning and scheduling. Some research projects as well as some applications are highlighted. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

  4. Superfund TIO videos. Set A. Regulatory overview - CERCLA's relationship to other programs: RCRA, Title III, UST, CWA, SDWA. Part 1. Audio-Visual

    SciTech Connect

    Not Available

    1990-01-01

    The videotape is divided into five sections. Section 1 provides definitions and historical information on both the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The four types of RCRA regulatory programs - Subtitles C, D, I, and J - are described. Treatment, storage, and disposal (TSD) and recycling facilities are also discussed. Section 2 discusses the history behind the Emergency Planning and Community Right-to-Know Act (Title III). The four major provisions of Title III, which are emergency planning, emergency release notification, community right-to-know reporting, and the toxic chemical release inventory are covered. Section 3 outlines the UST program covering notification, record keeping, and the UST Trust Fund. Section 4 outlines the six major provisions of the Clean Water Act (CWA): water quality, pretreatment, prevention of oil and hazardous substance discharges, responses to oil and hazardous substance discharges, discharges of hazardous substances into the ocean, and dredge and fill. Section 5 explains the purpose, regulations, and standards of the Safe Drinking Water Act (SDWA). Specific issues such as underground injection, sole source aquifers, and lead contamination are discussed.

  5. SUPERSTARS III: 3-5.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  6. SUPERSTARS III: 6-8.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  7. Discriminating Characteristics of Families Watching Sesame Street. Early Developmental Adversity Program: Phase III, EDAP Technical Note 15.1.

    ERIC Educational Resources Information Center

    Jordan, Thomas E.

    "Sesame Street" is a television program aimed at stimulating young viewers. This study, a part of the Early Developmental Adversity Program, attempts to discover what demographic characteristics are associated with children who view or do not view "Sesame Street." The subjects of the study were 69 3-year-old children. Black and white, as well as…

  8. Classroom Breakfast Scores High in Maryland: Findings from Year III of the Maryland Meals for Achievement Classroom Breakfast Pilot Program.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    In fall 1998, the Maryland State Department of Education and six schools began a pilot program to evaluate the impact of serving breakfast to students in the classroom as part of the school day. Students in participating schools have an opportunity to eat breakfast in their classroom each day at no charge, regardless of family income. The program,…

  9. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-108 (Bobbs-Merrill 1977); (4) Drainage-Water Rights and Reclamation, Title 42, Chapter 2, Idaho Code... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the program administered by the Idaho Department of Water Resources, approved by EPA pursuant...

  10. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-108 (Bobbs-Merrill 1977); (4) Drainage-Water Rights and Reclamation, Title 42, Chapter 2, Idaho Code... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the program administered by the Idaho Department of Water Resources, approved by EPA pursuant...

  11. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-108 (Bobbs-Merrill 1977); (4) Drainage-Water Rights and Reclamation, Title 42, Chapter 2, Idaho Code... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the program administered by the Idaho Department of Water Resources, approved by EPA pursuant...

  12. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-108 (Bobbs-Merrill 1977); (4) Drainage-Water Rights and Reclamation, Title 42, Chapter 2, Idaho Code... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the program administered by the Idaho Department of Water Resources, approved by EPA pursuant...

  13. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-108 (Bobbs-Merrill 1977); (4) Drainage-Water Rights and Reclamation, Title 42, Chapter 2, Idaho Code... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the program administered by the Idaho Department of Water Resources, approved by EPA pursuant...

  14. Evaluation of Flexibility Under "No Child Left Behind": Volume III--The Rural Education Achievement Program (REAP Flex)

    ERIC Educational Resources Information Center

    Christensen, Gayle S.; Amerikaner, Ary; Klasik, Daniel; Cohodes, Sarah

    2007-01-01

    This study focuses on flexibility provisions in the Rural Education Achievement Program (REAP) provision of NCLB. Specifically, it addresses REAP Flex, a program that allows rural districts additional control over how to spend portions of their federal funding. REAP Flex is part of a series of NCLB flexibility initiatives aimed at rural schools.…

  15. Chemistry - Part III, An Introduction to Organic Chemistry: Student Workbook for the Thirteen-College Curriculum Program.

    ERIC Educational Resources Information Center

    Booker, Edward; And Others

    This booklet is a student manual in a series of booklets that make up the core of a Physical Science course designed for the freshman year of college and used by teachers in the 27 colleges participating in the Thirteen College curriculum Program. This program is a curriculum revision project in support of 13 predominantly Negro colleges and…

  16. Chemistry - Part III, An Introduction to Organic Chemistry: Teacher's Curriculum Guide for the Thirteen-College Curriculum Program.

    ERIC Educational Resources Information Center

    Booker, Edward; And Others

    This booklet is a teacher's manual in a series of booklets that make up the core of a Physical Science course designed for the freshman year of college and used by teachers in the Thirteen College Curriculum Program. This program is a curriculum revision project in support of 13 predominantly Negro colleges and reflects educational research in the…

  17. 40 CFR 147.850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained at the Kansas Department of Health....860, is the program administered by the Kansas Department of Health and Environment, approved by EPA... consists of the following elements, as submitted to EPA in the State's program application....

  18. A threshold scheduling strategy for Sisal on distributed memory machines

    SciTech Connect

    Pande, S.S.; Agrawal, D.P.; Mauney, J. )

    1994-05-01

    The problem of scheduling tasks on distributed memory machines is known to be NP-complete in the strong sense, ruling out the possibility of a pseudo-polynomial algorithm. This paper introduces a new heuristic algorithm for scheduling Sisal (Streams and Iterations In a Single Assignment Language) programs on a distributed memory machine, Intel Touchstone i860. The compile time scheduling method works on IF-2, an intermediate form based on the dataflow parallelism in the program. The authors initially carry out a dependence analysis, to bind the implicit dependencies across IF-2 graph boundaries, followed by a cost assignment based on Intel Touchstone i860 timings. The scheduler works in two phases. The first phase of the scheduler finds the earliest and latest completion times of each task given by the shortest and longest paths from root task to the given task respectively. A threshold defined as the difference between the latest and the earliest start times of the task, is found. The scheduler varies the value of the allowable threshold, and determines the best value for minimal schedule length. In the second phase of the scheduler, the authors merge the processors to generate schedule to match the available number of processors. Schedule results for several benchmark programs have been included to demonstrate the effectiveness of their approach.

  19. Centaur Cost, Schedule and Performance Review

    NASA Astrophysics Data System (ADS)

    The Subcommittee on Space Science and Applications of the Committee on Science and Technology of the U.S. House of Representatives (99th Congress) met on 21-23 May 1985 to perform a cost, schedule and performance review of the Space Shuttle/Centaur Program. Excessive costs, amounting to more than 100 million dollars were attributed by the Subcommittee to government indecision, contracting delays, launch schedule pressures, and breakdowns in engineering and management systems at NASA and the contractor. The Centaur G-Prime vehicles were to be available for the Galileo Mission to Jupiter and the International Solar Polar Mission, but scheduled for launch in May - June 1986. However, this schedule cannot be met, and the next Jupiter launch window is not until July 1987.

  20. Evolutionary driver scheduling with relief chains.

    PubMed

    Kwan, R S; Kwan, A S; Wren, A

    2001-01-01

    Public transport driver scheduling problems are well known to be NP-hard. Although some mathematically based methods are being used in the transport industry, there is room for improvement. A hybrid approach incorporating a genetic algorithm (GA) is presented. The role of the GA is to derive a small selection of good shifts to seed a greedy schedule construction heuristic. A group of shifts called a relief chain is identified and recorded. The relief chain is then inherited by the offspring and used by the GA for schedule construction. The new approach has been tested using real-life data sets, some of which represent very large problem instances. The results are generally better than those compiled by experienced schedulers and are comparable to solutions found by integer linear programming (ILP). In some cases, solutions were obtained when the ILP failed within practical computational limits. PMID:11709104

  1. Evaluation of a 12-hour/day shift schedule

    SciTech Connect

    Lewis, P.M.; Swaim, D.J.

    1986-06-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8- to a 12-hour/day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility.

  2. Evaluation of a twelve-hour/day shift schedule

    SciTech Connect

    Lewis, P.M.; Swaim, D.J.

    1986-06-18

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility.

  3. Gemcitabine and cisplatin in a concomitant alternating chemoradiotherapy program for locally advanced head-and-neck cancer: A pharmacology-guided schedule

    SciTech Connect

    Numico, Gianmauro . E-mail: gianmauro.numico@fastwebnet.it; Russi, Elvio G.; Vitiello, Raffele; Sorrentino, Raffaele; Colantonio, Ida; Cipolat, Marco; Taglianti, Riccardo Vigna; Pelissero, Antonio; Fea, Elena; Granetto, Cristina; Di Costanzo, Gianna; Gasco, Milena; Garrone, Ornella; Occelli, Marcella; Merlano, Marco

    2006-11-01

    Purpose: Administration of gemcitabine together with cisplatin at cytotoxic doses in a chemoradiotherapy regimen is hampered by a high degree of local toxicity. Using the pharmacologic properties of the drug we designed a modified schedule aimed at reducing toxicity while preserving activity. Methods and Materials: Patients with squamous cell carcinomas of the oral cavity, pharynx and larynx, bulky T4, and/or N2 to N3 were eligible. Gemcitabine was administered at a dose of 800 mg/m{sup 2} on Days 1 and 12 and cisplatin at a dose of 20 mg/m{sup 2} on Days 2 to 5, every 21 days for 3 courses. Radiotherapy, delivered with standard fractionation, was given on Days 8 to 12 and 15 to 19 and was repeated 3 times up to a total dose of {>=}60 Gy. Results: A total of 28 patients were selected. Grade 3 to 4 stomatitis was recorded in 25 patients (89%). Thirteen patients (46%) experienced Grade 3 to 4 neutropenia. Febrile neutropenia occurred in 8 patients (29%) and in 2 was complicated by infection and death. The overall complete response rate was 79%. At a median follow up of 71 months, 11 patients had a locoregional relapse (3-year locoregional control, 64%); 6 patients had distant metastases, among whom only 2 were without locoregional recurrence. The 3-year progression-free survival is 39% and 3-year overall survival has been 43%. Conclusion: The schedule modification did not attenuate local toxicity. Moreover, infections and especially pneumonia, were a major problem. The high activity of gemcitabine when combined with radiotherapy would most likely be better exploited in the context of modified radiation schemes.

  4. The scheduling techniques of ESP2

    NASA Technical Reports Server (NTRS)

    Jaap, John P.; Davis, Elizabeth K.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center has developed a robust automatic scheduler which can produce detailed schedules for the multi-step activities required for payload operations on the Space Station. This scheduler, a part of the Expert Scheduling Program (ESP2), has five components: the bookkeeper, checker, loader, selector, and explainer. The bookkeeper maintains the usage profiles for nondepletable resources, consumables, equipment, crew, and the times of all the steps for the payload activities for several different schedules simultaneously. The checker searches the data maintained by the bookkeeper and finds times when the constraints of each step of an activity are satisfied. The loader is an expert system that uses the techniques of forward chaining, depth-first searching, and backtracking to manage the workings of the checker so that activities are placed in the schedule without violating constraints (such as crew, resources, and orbit opportunities). The checker searches the data maintained by the bookkeeper and finds times when the constraints of each step of an activity are satisfied. The loader is an expert system which uses the techniques of forward chaining, depth-first searching, and backtracking to manage the workings of the checker so that activities are placed in the schedule without violating the constraints. The selector has several methods of choosing the next activity for the loader to schedule. The explainer shows the user why an activity was or was not scheduled at a certain time; it offers a unique graphical explanation of how the expert system (the loader) works.

  5. Demonstration program for coal-oil mixture combustion in an electric utility boiler - Category III A. 1978 annual report

    SciTech Connect

    Not Available

    1980-04-01

    The 1978 annual report covers New England Power Service Company's participation in the Department of Energy coal-oil mixture (COM) program. Continued world-wide unrest resulting in an unstable fuel oil supply coupled with rapidly inflating costs have caused continued interest in a demonstrable viable solution. NEPSCO's program, while not attaining all the milestones forecast, has made considerable progress. As of January 31, 1979, ninety-five (95% percent of engineering and design has been completed. Construction of facilities and installation of required equipment was approximately 75% complete and the six-week Feasibility Testing program was expected to commence during April 1979.

  6. Scheduling and Utilization.

    ERIC Educational Resources Information Center

    Blakesley, James F.

    1982-01-01

    College scheduling system and operating procedure objectives influence efficient use of resources. Theoretical and practical considerations are outlined, including a step-by-step assessment of an institution's enrollment capacity and discussion of centralized or reassignable classrooms. (Author/MSE)

  7. Childhood Vaccine Schedule

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  8. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Grego

    2004-01-01

    Schedule Risk Assessment (SRA) determines the probability of finishing on or before a given point in time. This viewgraph presentation introduces the prerequisites, probability distribution curves, special conditions, calculations, and results analysis for SRA.

  9. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2005-01-01

    We investigate missions where communications resources are limited, requiring autonomous planning and execution. Unlike typical networks, spacecraft networks are also suited to automated planning and scheduling because many communications can be planned in advance.

  10. Initial Hardware Development Schedule

    NASA Technical Reports Server (NTRS)

    Culpepper, William X.

    1991-01-01

    The hardware development schedule for the Common Lunar Lander's (CLLs) tracking system is presented. Among the topics covered are the following: historical perspective, solution options, industry contacts, and the rationale for selection.

  11. Intelligent scheduling support for the US Coast Guard

    SciTech Connect

    Darby-Dowman, K.; Lucas, C.; Mitra, G. ); Fink, R. ); Kingsley, L.; Smith, J.W. )

    1992-01-01

    This paper will discuss a joint effort by the U.S. Coast Guard Research Development Center, Idaho National Engineering Laboratory and Brunel University to provide the necessary tools to increase the human scheduler's capability to handle the scheduling process more efficiently and effectively. Automating the scheduling process required a system that could think independently of the scheduler, that is, the systems needed its own control mechanism and knowledge base. Further, automated schedule generation became a design requirement and sophisticated algorithms were formulated to solve a complex combinatorial problem. In short, the resulting design can be viewed as a hybrid knowledge-based mathematical programming application system. This document contains an overview of the integrated system, a discrete optimization model for scheduling, and schedule diagnosis and analysis.

  12. Prototype resupply scheduler

    NASA Technical Reports Server (NTRS)

    Tanner, Steve; Hughes, Angi; Byrd, Jim

    1987-01-01

    Resupply scheduling for the Space Station presents some formidable logistics problems. One of the most basic problems is assigning supplies to a series of shuttle resupply missions. A prototype logistics expert system which constructs resupply schedules was developed. This prototype is able to reconstruct feasible resupply plans. In addition, analysts can use the system to evaluate the impact of adding, deleting or modifying launches, cargo space, experiments, etc.

  13. Enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling. Technical report

    SciTech Connect

    Morton, D.P.

    1994-01-01

    Handling uncertainty in natural inflow is an important part of a hydroelectric scheduling model. In a stochastic programming formulation, natural inflow may be modeled as a random vector with known distribution, but the size of the resulting mathematical program can be formidable. Decomposition-based algorithms take advantage of special structure and provide an attractive approach to such problems. We develop an enhanced Benders decomposition algorithm for solving multistage stochastic linear programs. The enhancements include warm start basis selection, preliminary cut generation, the multicut procedure, and decision tree traversing strategies. Computational results are presented for a collection of stochastic hydroelectric scheduling problems. Stochastic programming, Hydroelectric scheduling, Large-scale Systems.

  14. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    PubMed Central

    Soreth, Michelle Ennis; Hineline, Philip N

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to reinforcement on the FI schedule had elapsed, and thus the RI never produced a component schedule value shorter than the FI and maintained a rate of reinforcement half that of the FI. Despite these features, the FI was not strongly preferred. The probability of obtaining the smallest programmed delay to reinforcement on the RI schedule was manipulated in Experiment 1, and the interaction of this probability and initial link length was examined in Experiment 2. As the probability of obtaining small values in the RI increased, preference for the schedule increased while the discriminated time of reinforcer availability in the terminal link decreased. Both of these effects were attenuated by lengthening the initial links. The results support the view that in addition to the delay to reinforcement, the probability of obtaining a short delay is an important choice-affecting variable that likely contributes to the robust preferences for variable, as opposed to fixed, schedules of reinforcement. PMID:19230514

  15. Family Support Centers: A Program Manager's Toolkit. Volume I: Program Planning and Evaluation [and] Volume II: Managing Ongoing Operations [and] Volume III: The Power of Partnership.

    ERIC Educational Resources Information Center

    Family Support America, Chicago, IL.

    Since their appearance in the early 1970s, family support programs have represented a new way of working with families, based on the partnership they establish with families, their acceptance in the community as an asset and resource for all families, and the trusting relationship they build with families who participate in these programs. This…

  16. SAGE III

    Atmospheric Science Data Center

    2016-06-15

    SAGE III Data and Information The Stratospheric Aerosol and Gas ... on the spacecraft. SAGE III produced L1 and L2 scientific data from 5/07/2002 until 12/31/2005. The flight of the second instrument is as ... Guide Documents:  Project Guide Data Products User's Guide  (PDF) Relevant Documents:  ...

  17. Enhanced Software for Scheduling Space-Shuttle Processing

    NASA Technical Reports Server (NTRS)

    Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.; Nguyen, Tony K.; Peterson, Kenneth A.; Sargent, Susan; Shaw, Karma; Stoner, Mack D.; Stowell, Deborah S.; Young, Daniel A.; Tulley, James H., Jr.

    2004-01-01

    The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

  18. Expert system for scheduling simulation lab sessions

    NASA Technical Reports Server (NTRS)

    Lund, Chet

    1990-01-01

    Implementation and results of an expert system used for scheduling session requests for the Systems Engineering Simulator (SES) laboratory at the NASA Johnson Space Center (JSC) are discussed. Weekly session requests are received from astronaut crew trainers, procedures developers, engineering assessment personnel, software developers, and various others who wish to access the computers, scene generators, and other simulation equipment available to them in the SES lab. The expert system under discussion is comprised of a data acquisition portion - two Pascal programs run on a personal computer - and a CLIPS program installed on a minicomputer. A brief introduction to the SES lab and its scheduling background is given. A general overview of the system is provided, followed by a detailed description of the constraint-reduction process and of the scheduler itself. Results from a ten-week trial period using this approach are discussed. Finally, a summary of the expert system's strengths and shortcomings are provided.

  19. A MIP Model for Rolling Horizon Surgery Scheduling.

    PubMed

    Luo, Li; Luo, Yong; You, Yang; Cheng, Yuanjun; Shi, Yingkang; Gong, Renrong

    2016-05-01

    Most surgery scheduling is done 1 day in advance. Caused by lack of overall planning, this scheduling scheme often results in unbalanced occupancy time of the operating rooms. So we put forward a rolling horizon mixed integer programming model for the scheduling. Rolling horizon scheduling refers to a scheduling scheme in which cyclic surgical requests are taken into account. Surgical requests are updated daily. The completed surgeries are eliminated, and new surgeries are added to the scheduling list. Considering day-to-day demand for surgery, we develop a non-rolling scheduling model (NRSM) and a rolling horizon scheduling model (RSM). By comparing the two, we find that the quality of surgery scheduling is significantly influenced by the variation in demand from day to day. A rolling horizon scheduling will enable a more flexible planning of the pool of surgeries that have not been scheduled into this main blocks, and hence minimize the idle time of operating rooms. The strategy of the RSM helps balance the occupancy time among operating rooms. Using surgical data from five departments of the West China Hospital (WCH), we generate surgical demands randomly to compare the NRSM and the RSM. The results show the operating rooms' average utilization rate using RSM is significantly higher than when applying NRSM. PMID:27071394

  20. Generically Used Expert Scheduling System (GUESS): User's Guide Version 1.0

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira

    1996-01-01

    This user's guide contains instructions explaining how to best operate the program GUESS, a generic expert scheduling system. GUESS incorporates several important features for a generic scheduler, including automatic scheduling routines to generate a 'first' schedule for the user, a user interface that includes Gantt charts and enables the human scheduler to manipulate schedules manually, diagnostic report generators, and a variety of scheduling techniques. The current version of GUESS runs on an IBM PC or compatible in the Windows 3.1 or Windows '95 environment.

  1. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-03-01

    Although the Federal Facility Agreement (FFA) addresses the entire Oak Ridge Reservation, specific requirements are set forth for the liquid low-level radioactive waste (LLLW) storage tanks and their associated piping and equipment, tank systems, at ORNL. The stated objected of the FFA as it relates to these tank systems is to ensure that structural integrity, containment and detection of releases, and source control are maintained pending final remedial action at the site. The FFA requires that leaking LLLW tank systems be immediately removed from service. It also requires the LLLW tank systems that do not meet the design and performance requirements established for secondary containment and leak detection be either upgraded or replaced. The FFA establishes a procedural framework for implementing the environmental laws. For the LLLW tank systems, this framework requires the specified plans and schedules be submitted to EPA and TDEC for approval within 60 days, or in some cases, within 90 days, of the effective date of the agreement.

  2. Space-reactor system and subsystem investigations: Cost and schedule estimates for reactor and shield subsystems technology development. SP-100 program

    NASA Astrophysics Data System (ADS)

    Determan, W. R.; Harty, R. B.; Hylin, C.

    1983-06-01

    Cost and schedule estimates of the technology development for reactor and shielding subsystems of a 100-kWe class space reactor electric system are presented. The subsystems technology development (which includes reactor and shield subsystems ground testing) is supported by materials and processes development and component development. For the purpose of the cost estimate, seven generic types of reactor subsystems were used: uranium-zirconium hydride, NaK-cooled thermal reactor; lithium-cooled, refractory-clad fast reactors; Na- or K-cooled fast reactor; in-core thermionic reactor; inert gas-cooled particle fuel reactor; inert gas-cooled metal-clad fast reactor; and heat pipe-cooled fast reactor. Also three levels of technology were included for each of the generic types of reactor subsystem: current, improved, and advanced. The data in this report encompass all these technology levels. The shielding subsystem uses both gamma (heavy-metal) and neutron (hydrogenous material) shields. The shields considered would be used in conjunction with unmanned payloads.

  3. 40 CFR 147.2550 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the approved State-administered program: (1) Article 9, Underground Water, Wyoming Statutes sections... Department of Environmental Quality, to Acting Director, Water Management Division, EPA Region VIII, December..., Install or Modify Public Facilities Capable or, (sic) Causing or Contributing to Pollution (certified...

  4. 40 CFR 147.2550 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the approved State-administered program: (1) Article 9, Underground Water, Wyoming Statutes sections... Department of Environmental Quality, to Acting Director, Water Management Division, EPA Region VIII, December..., Install or Modify Public Facilities Capable or, (sic) Causing or Contributing to Pollution (certified...

  5. USE OF THE PERFORMANCE APPROACH FOR EVERGLADES REGIONAL ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM (R-EMAP) PHASE III

    EPA Science Inventory

    The US Environmental Protection Agency (EPA) occasionally performs environmental monitoring/assessment studies such as the Everglades Regional Environmental Monitoring and Assessment Program (R-EMAP). In-situ data were documented in the field, and eight analytical labs were contr...

  6. 76 FR 77982 - Applications for Eligibility Designation; Programs Under Parts A and F of Title III of the Higher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ..., 2010 (75 FR 44055) (PPOHA NFP). Among the requirements established for the PPOHA Program in the PPOHA.... Department of Health and Human Services in the Federal Register on January 23, 2009 (74 FR 4199). The..., published in the Federal Register on July 27, 2010 (75 FR 44055). Note: There are no...

  7. Evidence-Based Programming in the Context of Practice and Policy. Social Policy Report. Volume XXIII, Number III

    ERIC Educational Resources Information Center

    McCall, Robert B.

    2009-01-01

    Scholars, practice professionals, and policymakers should welcome the new era of evidence-based programming and policies, but these constituencies need to be realistic about the complexities, uncertainties, and limitations that lie beneath what could easily become a simplistic process. This paper discusses some of the requirements for the…

  8. 40 CFR 147.850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained at the Kansas Department of Health... (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL..., Construction, operation, monitoring and abandonment of salt solution mining wells, Kansas...

  9. Preschool Recreation Enrichment Program (PREP). Trainers Handbook. Volume III. An Aid for Providers of Recreation and Education Services.

    ERIC Educational Resources Information Center

    Littman, Karen G.

    The report presents a competency based instruction approach for training providers of preschool recreation programs for both handicapped and nonhandicapped children. Seven training modules are presented, each module listing particular learning objectives in behavioral terms, along with suggested learning activities (such as readings and…

  10. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  11. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  12. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  13. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  14. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  15. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  16. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  17. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  18. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  19. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  20. Developmental Handicaps: Prevention and Treatment, III. A Cooperative Project between University Affiliated Facilities and State MCH/CC Programs.

    ERIC Educational Resources Information Center

    John F. Kennedy Inst., Baltimore, MD.

    Third in a series on the prevention and treatment of developmental handicaps, this publication focuses on linkages among the network of university affiliated facilities (UAFs) and Title V Maternal and Child Health Programs. Four papers in Section I address the following developmental issues as of 1985: "Serious Viral Infection in Developmentally…

  1. Analysis of the Competency-Based High School Diploma Program for CETA Clients. Report III: Student/Client Completion Results.

    ERIC Educational Resources Information Center

    McMillan, Samuel H., Jr.

    A study examined the student/client completion of a competency-based high school diploma for CETA clients. Using follow-up forms, attendance records, correspondence, telephone calls, and client information sheets, researchers collected data from clients and staff pertaining to 102 of the 238 program clients from five sites in Texas (Abilene,…

  2. Scheduling periodic jobs using imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1987-01-01

    One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

  3. Chandra mission scheduling on-orbit experience

    NASA Astrophysics Data System (ADS)

    Bucher, Sabina; Williams, Brent; Pendexter, Misty; Balke, David

    2008-07-01

    Scheduling observatory time to maximize both day-to-day science target integration time and the lifetime of the observatory is a formidable challenge. Furthermore, it is not a static problem. Of course, every schedule brings a new set of observations, but the boundaries of the problem change as well. As spacecraft ages, its capabilities may degrade. As in-flight experience grows, capabilities may expand. As observing programs are completed, the needs and expectations of the science community may evolve. Changes such as these impact the rules by which a mission scheduled. In eight years on orbit, the Chandra X-Ray Observatory Mission Planning process has adapted to meet the challenge of maximizing day-to-day and mission lifetime science return, despite a consistently evolving set of scheduling constraints. The success of the planning team has been achieved, not through the use of complex algorithms and optimization routines, but through processes and home grown tools that help individuals make smart short term and long term Mission Planning decisions. This paper walks through the processes and tools used to plan and produce mission schedules for the Chandra X-Ray Observatory. Nominal planning and scheduling, target of opportunity response, and recovery from on-board autonomous safing actions are all addressed. Evolution of tools and processes, best practices, and lessons learned are highlighted along the way.

  4. Architectures for statically scheduled dataflow

    SciTech Connect

    Lee, E.A.; Bier, J.C. )

    1990-12-01

    When dataflow program graphs can be statically scheduled, little run-time overhead (software or hardware) is necessary. This paper describes a class of parallel architectures consisting of von Neumann processors and one or more shared memories, where the order of shared- memory access is determined at compile time and enforced at run time. The architecture is extremely lean in hardware, yet for a set of important applications it can perform as well as any shared-memory architecture. Dataflow graphs can be mapped onto it statically. Furthermore, it supports shared data structures without the run-time overhead of I-structures. A software environment has been constructed that automatically maps signal processing applications onto a simulation of such an architecture, where the architecture is implemented using Motorola DSP96002 microcomputers. Static (compile-time) scheduling is possible for a subclass of dataflow program graphs where the firing pattern of actors is data independent. This model is suitable for digital signal processing and some other scientific computation. It supports recurrences, manifest iteration, and conditional assignment. However, it does not support true recursion, data-dependent iteration, or conditional evaluation. An effort is under way to weaken the constraints of the model to determine the implications for hardware design.

  5. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  6. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  7. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  8. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  9. 75 FR 34115 - Pesticides; Availability of Updated Schedule for Registration Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... AGENCY Pesticides; Availability of Updated Schedule for Registration Review AGENCY: Environmental... for the pesticide registration review program, the periodic review of all registered pesticides... schedule provides the timetable for opening dockets for the next 4 years of the registration review...

  10. The Effectiveness of Performance Incentives under Continuous and Variable Ration Schedules of Reinforcement

    ERIC Educational Resources Information Center

    Yukl, Gary A.; And Others

    1976-01-01

    Results of this study indicate that sample group of unskilled laborers were more productive working under a schedule of continuous reinforcement than under a varied schedule, despite higher average earnings during the latter program. (RW)

  11. An optimal spacecraft scheduling model for the NASA deep space network

    NASA Technical Reports Server (NTRS)

    Webb, W. A.

    1985-01-01

    A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's method and a heuristic starting algorithm.

  12. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  13. Grant Administration Manual for Title III Coordinators.

    ERIC Educational Resources Information Center

    Mathis, Emily Duncan; Ashmore, Frances W.

    Guidelines for coordinators of programs under Title III of the Higher Education Act of 1965 are presented, based on a national survey of Title III program coordinators. The responsibilities of the coordinator and information on administering the Strengthening Developing Institutions Program (SDIP) grant are covered. The program can either be a…

  14. Energy audit of three energy-conserving devices in a steel industry demonstration program. Task III. GTE high temperature recuperation

    SciTech Connect

    Holden, F.C.; Hoffman, A.O.; Lownie, H.W.

    1983-06-01

    The Office of Industrial Programs of the Department of Energy has undertaken a program to demonstrate to industry the benefits of installing various energy-conserving devices and equipment. This report presents results on one of those systems, a high-temperature ceramic recuperator designed and manufactured by Sylvania Chemical and Metallurgical Division, GTE Products Corporation of Towanda, Pennsylvania. The ceramic cross-flow recuperator unit recovers waste heat from the hot combustion gases and delivers preheated air to high-temperature burners of various manufacture. Of the 38 host site installations included in the program, sufficient operating data were obtained from 28 sites to evaluate the benefits in terms of energy and economic savings that can be achieved. Performance and cost data are analyzed and presented for those 28 installations, which covered a variety of applications, sizes, and industry types. Except for 5 sites where unusual operating or data-collection problems were encountered, the improvements in performance of the recuperated furnaces equalled or exceeded estimates; the average of the total fuel savings for these 23 sites was 44.0 percent, some portion of which resulted from furnace improvements other than recuperation. Payback times were calculated for both total costs and for recuperator-related costs, using a cumulative annual after-tax cash flow method which includes tax investment credits, estimates of general and fuel-price inflation, and maintenance costs.

  15. Current Use of DSM-III-R in Counselor Education.

    ERIC Educational Resources Information Center

    Ritchie, Martin H.; And Others

    1991-01-01

    Surveyed 146 counselor education programs to investigate proportion of programs that teach use of "Diagnostic and Statistical Manual of Mental Disorders-3rd Edition," revised (DSM-III-R), program tracks requiring DSM-III-R training, and differences between accredited and nonaccredited programs in DSM-III-R coverage. Found that most programs taught…

  16. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  17. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  18. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  19. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  20. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  1. 44 CFR 72.3 - Fee schedule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROCEDURES AND FEES FOR PROCESSING MAP CHANGES § 72.3 Fee schedule. (a) For requests for CLOMRs, LOMRs, and PMRs based on structural... Register. (c) For conditional and final map revision requests for the following categories, flat user...

  2. 44 CFR 72.3 - Fee schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROCEDURES AND FEES FOR PROCESSING MAP CHANGES § 72.3 Fee schedule. (a) For requests for CLOMRs, LOMRs, and PMRs based on structural... Register. (c) For conditional and final map revision requests for the following categories, flat user...

  3. 29 CFR 1952.311 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Developmental schedule. 1952.311 Section 1952.311 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR.... (d) Complete implementation of the occupational health program by July 1975. (e) Complete State...

  4. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-03-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments.

  5. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  6. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  7. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  8. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  9. 40 CFR 142.55 - Final schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Exemptions Issued by the Administrator § 142.55 Final... water system granted an exemption under § 142.52. (b) Such schedule must require compliance with...

  10. 40 CFR 63.1401 - Compliance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Compliance schedule. 63.1401 Section 63.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission...

  11. Scheduling with Automatic Resolution of Conflicts

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  12. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-09-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has one irradiation experiment in reactor and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments.

  13. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM APPEALS OF QUALITY CONTROL (âQCâ) CLAIMS...

  14. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM APPEALS OF QUALITY CONTROL (âQCâ) CLAIMS...

  15. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM APPEALS OF QUALITY CONTROL (âQCâ) CLAIMS...

  16. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM APPEALS OF QUALITY CONTROL (âQCâ) CLAIMS...

  17. 40 CFR 63.1291 - Compliance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Compliance schedule. 63.1291 Section 63.1291 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants for...

  18. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  19. 41 CFR 105-60.305-10 - Fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Fee schedule. 105-60.305..., Orders, Policies, Interpretations, Manuals, and Instructions § 105-60.305-10 Fee schedule. (a) When GSA... operating a statutory fee based program, GSA will inform the requester of the procedures for...

  20. 20 CFR 614.12 - Schedules of remuneration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Schedules of remuneration. 614.12 Section 614.12 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR UNEMPLOYMENT COMPENSATION FOR EX-SERVICEMEMBERS Administration of UCX Program § 614.12 Schedules of remuneration. (a) Authority. Section 8521(a)(2) of chapter...

  1. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Flight scheduling and locating requirements... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a)...

  2. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Flight scheduling and locating requirements... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a)...

  3. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Flight scheduling and locating requirements... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a)...

  4. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Flight scheduling and locating requirements... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a)...

  5. 28 CFR 548.13 - Schedules and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and...

  6. NASA revises shuttle schedule

    NASA Astrophysics Data System (ADS)

    Wainger, Lisa A.

    The new schedule for Space Shuttle missions and expendable launch vehicles (ELV's) calls for a 7-month delay in sending up the Hubble Space Telescope. NASA was forced to put off launching the telescope until February 1990 to keep the Magellan and Galileo missions within their narrow launch windows. The first post-Challenger shuttle launch is now scheduled for late this month. Discovery's most recent delays were due to a hydrogen leak discovered July 29 that has still not been corrected and an engine valve malfunction during an August 4 test fire.

  7. Intelligent retail logistics scheduling

    SciTech Connect

    Rowe, J.; Jewers, K.; Codd, A.; Alcock, A.

    1996-12-31

    The Supply Chain Integrated Ordering Network (SCION) Depot Bookings system automates the planning and scheduling of perishable and non-perishable commodities and the vehicles that carry them into J. Sainsbury depots. This is a strategic initiative, enabling the business to make the key move from weekly to daily ordering. The system is mission critical, managing the inwards flow of commodities from suppliers into J. Sainsbury`s depots. The system leverages Al techniques to provide a business solution that meets challenging functional and performance needs. The SCION Depot Bookings system is operational providing schedules for 22 depots across the UK.

  8. Multiple daily fractionation schedules

    SciTech Connect

    Peschel, R.E.; Fischer, J.J.

    1982-10-01

    Although conventional fractionation schedules have been satisfactory for the treatment of some tumors, there is reason to believe that the results of radiation therapy could be improved in some cases by appropriate alterations in treatment schedules. The pharmacological characteristics of some of the electron affinic radiation sensitizers have provided added incentive to investigate newer fractionation schemes, particularly ones which deliver the majority of the radiation dose in short periods of time. This editorial discusses three papers describing preliminary clinical studies using multi-daily fractionated (MDF) radiation therapy. Two of these studies also make use of the radiation sensitizer misonidazole. (KRM)

  9. C.U.B.E. Reading. Goal III. A Reading Program for Adult Basic Education. 0-6 Grade Students. Book 2 of Three Books in This Program.

    ERIC Educational Resources Information Center

    Vincennes Univ., IN.

    A part of the adult basic education teaching/learning management system called CUBE (Continuity and Unity in Basic Education), this manual is designed to help those teaching students with "splinter skills" to piece together the students' deficient skills and develop an individualized reading program. It consists of three sections. Addressed in…

  10. Scheduling Operations for Massive Heterogeneous Clusters

    NASA Technical Reports Server (NTRS)

    Humphrey, John; Spagnoli, Kyle

    2013-01-01

    High-performance computing (HPC) programming has become increasingly difficult with the advent of hybrid supercomputers consisting of multicore CPUs and accelerator boards such as the GPU. Manual tuning of software to achieve high performance on this type of machine has been performed by programmers. This is needlessly difficult and prone to being invalidated by new hardware, new software, or changes in the underlying code. A system was developed for task-based representation of programs, which when coupled with a scheduler and runtime system, allows for many benefits, including higher performance and utilization of computational resources, easier programming and porting, and adaptations of code during runtime. The system consists of a method of representing computer algorithms as a series of data-dependent tasks. The series forms a graph, which can be scheduled for execution on many nodes of a supercomputer efficiently by a computer algorithm. The schedule is executed by a dispatch component, which is tailored to understand all of the hardware types that may be available within the system. The scheduler is informed by a cluster mapping tool, which generates a topology of available resources and their strengths and communication costs. Software is decoupled from its hardware, which aids in porting to future architectures. A computer algorithm schedules all operations, which for systems of high complexity (i.e., most NASA codes), cannot be performed optimally by a human. The system aids in reducing repetitive code, such as communication code, and aids in the reduction of redundant code across projects. It adds new features to code automatically, such as recovering from a lost node or the ability to modify the code while running. In this project, the innovators at the time of this reporting intend to develop two distinct technologies that build upon each other and both of which serve as building blocks for more efficient HPC usage. First is the scheduling and dynamic

  11. The Apple III.

    ERIC Educational Resources Information Center

    Ditlea, Steve

    1982-01-01

    Describes and evaluates the features, performance, peripheral devices, available software, and capabilities of the Apple III microcomputer. The computer's operating system, its hardware, and the commercially produced software it accepts are discussed. Specific applications programs for financial planning, accounting, and word processing are…

  12. The Responsive Classroom Observation Schedule--Background and Development.

    ERIC Educational Resources Information Center

    Rayder, Nicholas F.; And Others

    This report focuses on the development and implementation of a 1-day classroom observation schedule designed to evaluate the Responsive Education Program, a compensatory program of formal education for children, ages 3-9, and their families. The program is an effort to create Head Start and Follow Through programs for children who are ethnically…

  13. Cost and schedule analytical techniques development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

  14. Collegiate Athletics: An Investigation into Athletic Persistence of Freshman Student-Athletes Participating in NCAA Division-III Varsity Athletic Programs

    ERIC Educational Resources Information Center

    Sombito, Lester Jamili

    2015-01-01

    Understanding of the persistence of student-athletes in athletics at the D-III level is complex. This research study investigated the issue of student-athlete retention by focusing on Division III (D-III) student-athlete persistence in athletics by asking the following research question, "To what extent do freshman student-athletes persist in…

  15. Quay crane scheduling for an indented berth

    NASA Astrophysics Data System (ADS)

    Lee, Der-Horng; Chen, Jiang Hang; Cao, Jin Xin

    2011-09-01

    This article explores the quay crane scheduling problem at an indented berth. The indented berth is known as an innovative implementation in the container terminals to tackle the challenge from the emergence of more and more mega-containerships. A mixed integer programming model by considering the non-crossing and safety distance constraints is formulated. A Tabu search heuristic is developed to solve the proposed problem. The computational results from this research indicate that the designed Tabu search is an effective method to handle the quay crane scheduling problem at an indented berth.

  16. Integrated planning and scheduling for Earth science data processing

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1995-01-01

    Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

  17. CMS multicore scheduling strategy

    SciTech Connect

    Perez-Calero Yzquierdo, Antonio; Hernandez, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  18. CMS multicore scheduling strategy

    NASA Astrophysics Data System (ADS)

    Pérez-Calero Yzquierdo, Antonio; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison; Cms Collaboration

    2014-06-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue "Moore's Law" style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  19. "Creative" Work Schedules.

    ERIC Educational Resources Information Center

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  20. Parent Interview Schedule.

    ERIC Educational Resources Information Center

    Purdue Univ., Lafayette, IN. Educational Research Center.

    This 116-item interview schedule designed for parents who failed to respond to the Questionnaire for Parents, is individually administered to the mother of the child of elementary school age. It consists of scales measuring 14 parent variables plus a section devoted to demographic variables: (1) parent's achievement aspirations for the child, (2)…

  1. Schedule-Induced Stereotypy.

    ERIC Educational Resources Information Center

    Emerson, Eric; Howard, Denise

    1992-01-01

    The phenomena of the induction and entrainment of adjunctive behaviors was investigated in 8 people (ages 5-51) with severe or profound mental retardation who exhibited stereotypic behaviors. Seven of the eight demonstrated evidence of schedule-induced stereotypic behavior, whereas five also showed evidence of the entrainment of these behaviors by…

  2. Title III in Special Education.

    ERIC Educational Resources Information Center

    The Title III Quarterly, 1972

    1972-01-01

    The journal on special education programs funded under Title III of the Elementary and Secondary Education Act contains articles on three projects, abstracts of other projects, a picture story on San Diego Schools' outdoor classroom for special education, and a state by state listing of all Title III special education projects. The programs…

  3. 2007 Wholesale Power Rate Case Initial Proposal : 2007 Wholesale Power Rate Schedule and General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2005-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  4. A system for optimizing the scheduling and blending of crudes

    SciTech Connect

    Cutting, G.A.G.; Haverly, C.A.

    1995-09-01

    Operational scheduling within the downstream oil industry covers a wide range of tasks and decision making activities which have traditionally been undertaken with little or no assistance from specialized decision support tools. HSI has recently addressed this software gap and has developed scheduling decision support systems aimed specifically at the needs of the operational scheduler. In this paper the authors discuss the potential application of this software to crude oil scheduling covering pipeline delivery, terminal operations and optimized blending for feed to topping units. In addition HSI`s new scheduling software can be configured for use in refinery process unit scheduling, product blending and product distribution giving comprehensive cover to all aspects of downstream oil scheduling activities. The main scheduling system has been designed as a modular one so that the appropriate level of system complexity can be installed for any given application and to allow for stagewise implementation. The modules include a short term optimization module using Linear and/or Mixed Integer Programming techniques, a rule based Expert System decision generation module, a comprehensive event based operations simulation module and full graphic and text reporting modules. It is designed for network applications so that a number of schedulers can use the same system for individual tasks sharing data and other elements of the system to produce a fully integrated operating schedule. Substantial financial benefits should come from the improved ability of the schedulers to recover from the wide range of operational disturbances that routinely affect operations, the ability to perform What If studies to improve operating schedules and a faster response to commercial opportunities that regularly arise. Estimates are that a fully functioning operations scheduling system designed specifically for the job should pay for itself in no more than one year.

  5. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  6. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  7. Information Consumption by Low Income Families to Reduce the Impact of Rural Poverty in Florida. Volume III, Knowledge Level, Need, and Use of Selective Anti-Poverty Programs by the Rural Poor.

    ERIC Educational Resources Information Center

    Dhillon, Jogindar S.

    Presented as part of a 4-volume comprehensive report of a Florida project designed to understand rural poor and their information-seeking and information-utilization behavior patterns, Volume III reported data collected in a pre-test, used to determine the awareness and utilization of seven anti-poverty programs. Low income rural residents (N=840)…

  8. Different elution modes and field programming in gravitational field-flow fractionation. III. Field programming by flow-rate gradient generated by a programmable pump.

    PubMed

    Plocková, J; Chmelík, J

    2001-05-25

    Gravitational field-flow fractionation (GFFF) utilizes the Earth's gravitational field as an external force that causes the settlement of particles towards the channel accumulation wall. Hydrodynamic lift forces oppose this action by elevating particles away from the channel accumulation wall. These two counteracting forces enable modulation of the resulting force field acting on particles in GFFF. In this work, force-field programming based on modulating the magnitude of hydrodynamic lift forces was implemented via changes of flow-rate, which was accomplished by a programmable pump. Several flow-rate gradients (step gradients, linear gradients, parabolic, and combined gradients) were tested and evaluated as tools for optimization of the separation of a silica gel particle mixture. The influence of increasing amount of sample injected on the peak resolution under flow-rate gradient conditions was also investigated. This is the first time that flow-rate gradients have been implemented for programming of the resulting force field acting on particles in GFFF. PMID:11407583

  9. Advanced Technology System Scheduling Governance Model

    SciTech Connect

    Ang, Jim; Carnes, Brian; Hoang, Thuc; Vigil, Manuel

    2015-06-11

    In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. The process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).

  10. State-based scheduling: An architecture for telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.

    1989-01-01

    The applicability of constraint-based scheduling, a methodology previously developed and validated in the domain of factory scheduling, is extended to problem domains that require attendance to a wider range of state-dependent constraints. The problem of constructing and maintaining a short-term observation schedule for the Hubble Space Telescope (HST), which typifies this type of domain is the focus of interest. The nature of the constraints encountered in the HST domain is examined, system requirements are discussed with respect to utilization of a constraint-based scheduling methodology in such domains, and a general framework for state-based scheduling is presented.

  11. NASA launch schedule

    NASA Astrophysics Data System (ADS)

    Bell, Peter M.

    The National Aeronautics and Space Administration (NASA) has a record-setting launch schedule for 1984—10 space shuttle flights (see Table 1), 10 satellite deployments from the space shuttle in orbit and 12 unmanned missions using expendable launch vehicles. Also scheduled is the launch on March 1 for the National Oceanic and Atmospheric Administration of Landsat D‧, the nation's second earth resources satellite.The launch activity will begin February 3 with the launch of shuttle mission 41-B using the orbiter Challenger. Two communications satellites will be deployed from 41-B: Westar-VI, for Western Union, and Palapa B-2 for the government of Indonesia. The 8-day mission will feature the first shuttle landing at Kennedy Space Center in Florida; and the first flight of the Manned Maneuvering Unit, a self-contained, propulsive backpack that will allow astronauts to move about in space without being tethered to the spacecraft.

  12. Observation Scheduling System

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel Q.; Rabideau, Gregg R.; Schaffer, Steven R.

    2011-01-01

    Software has been designed to schedule remote sensing with the Earth Observing One spacecraft. The software attempts to satisfy as many observation requests as possible considering each against spacecraft operation constraints such as data volume, thermal, pointing maneuvers, and others. More complex constraints such as temperature are approximated to enable efficient reasoning while keeping the spacecraft within safe limits. Other constraints are checked using an external software library. For example, an attitude control library is used to determine the feasibility of maneuvering between pairs of observations. This innovation can deal with a wide range of spacecraft constraints and solve large scale scheduling problems like hundreds of observations and thousands of combinations of observation sequences.

  13. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  14. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  15. Scheduling a C-Section

    MedlinePlus

    ... Labor & birth > Scheduling a c-section Scheduling a c-section E-mail to a friend Please fill ... develop before she’s born. Why can scheduling a c-section for non-medical reasons be a problem? ...

  16. Flexible Scheduling: Making the Transition

    ERIC Educational Resources Information Center

    Creighton, Peggy Milam

    2008-01-01

    Citing literature that supports the benefits of flexible scheduling on student achievement, the author exhorts readers to campaign for flexible scheduling in their library media centers. She suggests tips drawn from the work of Graziano (2002), McGregor (2006) and Stripling (1997) for making a smooth transition from fixed to flexible scheduling:…

  17. Automated observation scheduling for the VLT

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

  18. Automated observation scheduling for the VLT

    NASA Astrophysics Data System (ADS)

    Johnston, Mark D.

    1988-08-01

    It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

  19. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books.... (Schedule K-1), Balance Sheets per Books (Schedule L), Reconciliation of Income (Loss) per Books With...

  20. Welding III.

    ERIC Educational Resources Information Center

    Allegheny County Community Coll., Pittsburgh, PA.

    Instructional objectives and performance requirements are outlined in this course guide for Welding III, an advanced course in arc welding offered at the Community College of Allegheny County to provide students with the proficiency necessary for industrial certification. The course objectives, which are outlined first, specify that students will…

  1. LANDVIEW III

    EPA Science Inventory

    LandView III is a desktop mapping system that includes database extracts from the Environmental Protection Agency, the Bureau of the Census, The U.S. Geological Survey, the Nuclear Regulatory Commission, the Department of Transportation, and the Federal Emergency Management Agenc...

  2. Alternative Scheduling Models and Their Effect on Science Achievement at the High School Level

    ERIC Educational Resources Information Center

    Dostal, Jay Roland

    2010-01-01

    This study will evaluate alternative scheduling methods implemented in secondary level schools. Students were selected based on parent selection of programs. Traditional scheduling involves numerous academic subjects with small increments of time in each class and block scheduling focuses on fewer academic subjects and more instructional time.…

  3. Toward an Autonomous Telescope Network: the TBT Scheduler

    NASA Astrophysics Data System (ADS)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  4. Spike: Artificial intelligence scheduling for Hubble space telescope

    NASA Technical Reports Server (NTRS)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  5. A program system for ab initio MO calculations on vector and parallel processing machines III. Integral reordering and four-index transformation

    NASA Astrophysics Data System (ADS)

    Wiest, Roland; Demuynck, Jean; Bénard, Marc; Rohmer, Marie-Madeleine; Ernenwein, René

    1991-01-01

    This series of three papers presents a program system for ab initio molecular orbital calculations on vector and parallel computers. Part III is devoted to the four-index transformation on a molecular orbital basis of size NMO of the file of two-electron integrals ( pq∥ rs) generated by a contracted Gaussian set of size NATO (number of atomic orbitals). A fast Yoshimine algorithm first sorts the ( pq∥ rs) integrals with respect to index pq only. This file of half-sorted integrals labelled by their rs-index can be processed without further modification to generate either the transformed integrals or the supermatrix elements. The large memory available on the CRAY-2 has made possible to implement the transformation algorithm proposed by Bender in 1972, which requires a core-storage allocation varying as (NATO) 3. Two versions of Bender's algorithm are included in the present program. The first version is an in-core version, where the complete file of accumulated contributions to transformed integrals is stored and updated in central memory. This version has been parallelized by distributing over a limited number of logical tasks the NATO steps corresponding to the scanning of the most external loop. The second version is an out-of-core version, in which twin fires are alternatively used as input and output for the accumulated contributions to transformed integrals. This version is not parallel. The choice of one or another version and (for version 1) the determination of the number of tasks depends upon the balance between the available and the requested amounts of storage. The storage management and the choice of the proper version are carried out automatically using dynamic storage allocation. Both versions are vectorized and take advantage of the molecular symmetry.

  6. Designing safe job rotation schedules using optimization and heuristic search.

    PubMed

    Carnahan, B J; Redfern, M S; Norman, B

    2000-04-01

    Job rotation is one method that is sometimes used to reduce exposure to strenuous materials handling; however, developing effective rotation schedules can be complex in even moderate sized facilities. The purpose of this research is to develop methods of incorporating safety criteria into scheduling algorithms to produce job rotation schedules that reduce the potential for injury. Integer programming and a genetic algorithm were used to construct job rotation schedules. Schedules were comprised of lifting tasks whose potential for causing injury was assessed with the Job Severity Index. Each method was used to design four job rotation schedules that met specified safety criteria in a working environment where the object weight, horizontal distance and repetition rate varied over time. Each rotation was assigned to a specific gender/lifting capacity group. Five versions of the integer programming search method were applied to this problem. Each version generated one job rotation schedule. The genetic algorithm model was able to create a population of 437 feasible solutions to the rotation problem. Utilizing cluster analysis, a rule set was derived from the genetic algorithm generated solutions. These rules provided guidelines for designing safe job rotation schedules without the use of a computer. The advantages and limitations of these approaches in developing administrative controls for the prevention of back injury are discussed. PMID:10801086

  7. Establishment of a prenatal diagnosis schedule as part of a prophylaxis program of factor XIII deficiency in the southeast of Iran.

    PubMed

    Naderi, Majid; Reykande, Samira Esmaeili; Dorgalaleh, Akbar; Alizadeh, Shaban; Tabibian, Shadi; Einollahi, Nahid; Moghaddam, Ebrahim Miri

    2016-01-01

    Factor XIII deficiency (FXIIID) is an extremely rare bleeding disorder with a prevalence of 1 in 3 million in the general population. Compared to its global incidence, it has the greatest prevalence in Sistan and Baluchistan Province in the southeast of Iran. The high incidence of FXIIID in this region causes a high rate of morbidity and mortality among the affected individuals because of life-threatening episodes such as central nervous system (CNS) bleeding, umbilical cord bleeding, as well as miscarriage. CNS bleeding leads to a considerable number of neurological and behavioral complications. Therefore, we have designed an established prenatal diagnosis (PND) program to prevent the increasing incidence of life-threatening bleeding episodes and related complications among neonates with congenital FXIIID. This study was conducted from September 2013 to August 2014. A consent form was signed by the parents. Fetal sampling was done via abdominal chorionic villus sampling passage under local anesthesia and ultrasonic guidance within the first trimester of pregnancy. Fetal DNA was extracted, and PCR-restriction fragment length polymorphism was performed for the only reported mutation of FXIII (Trp187Arg) in the southeast of Iran. During the period of study, PND was performed on eight fetuses. Six fetuses were offspring of parental consanguineous marriages, and all of them had a positive family history of FXIIID. Seven out of the eight fetuses had a family member with CNS bleeding due to FXIIID. Four fetuses had a FXIIID-related death. One of the fetuses bore homozygous Trp187Arg mutation, whereas six were heterozygous, and one of the mothers gave birth to an unaffected fetus. To the best of our knowledge, PND is a possible solution to control high incidence of life-threatening episodes of FXIIID in southeast Iran. PMID:26703985

  8. Parallel scheduling of recursively defined arrays

    NASA Technical Reports Server (NTRS)

    Myers, T. J.; Gokhale, M. B.

    1986-01-01

    A new method of automatic generation of concurrent programs which constructs arrays defined by sets of recursive equations is described. It is assumed that the time of computation of an array element is a linear combination of its indices, and integer programming is used to seek a succession of hyperplanes along which array elements can be computed concurrently. The method can be used to schedule equations involving variable length dependency vectors and mutually recursive arrays. Portions of the work reported here have been implemented in the PS automatic program generation system.

  9. Scheduling Jobs with Genetic Algorithms

    NASA Astrophysics Data System (ADS)

    Ferrolho, António; Crisóstomo, Manuel

    Most scheduling problems are NP-hard, the time required to solve the problem optimally increases exponentially with the size of the problem. Scheduling problems have important applications, and a number of heuristic algorithms have been proposed to determine relatively good solutions in polynomial time. Recently, genetic algorithms (GA) are successfully used to solve scheduling problems, as shown by the growing numbers of papers. GA are known as one of the most efficient algorithms for solving scheduling problems. But, when a GA is applied to scheduling problems various crossovers and mutations operators can be applicable. This paper presents and examines a new concept of genetic operators for scheduling problems. A software tool called hybrid and flexible genetic algorithm (HybFlexGA) was developed to examine the performance of various crossover and mutation operators by computing simulations of job scheduling problems.

  10. Using the principles of circadian physiology enhances shift schedule design

    SciTech Connect

    Connolly, J.J.; Moore-Ede, M.C.

    1987-01-01

    Nuclear power plants must operate 24 h, 7 days a week. For the most part, shift schedules currently in use at nuclear power plants have been designed to meet operational needs without considering the biological clocks of the human operators. The development of schedules that also take circadian principles into account is a positive step that can be taken to improve plant safety by optimizing operator alertness. These schedules reduce the probability of human errors especially during backshifts. In addition, training programs that teach round-the-clock workers how to deal with the problems of shiftwork can help to optimize performance and alertness. These programs teach shiftworkers the underlying causes of the sleep problems associated with shiftwork and also provide coping strategies for improving sleep and dealing with the transition between shifts. When these training programs are coupled with an improved schedule, the problems associated with working round-the-clock can be significantly reduced.

  11. External Tank Program Legacy of Success

    NASA Technical Reports Server (NTRS)

    Welzyn, Ken; Pilet, Jeff

    2010-01-01

    I.Goal: a) Extensive TPS damage caused by extreme hail storm. b) Repair plan required to restore TPS to minimize program manifest impacts. II. Challenges: a) Skeptical technical community - Concerned about interactions of damage with known/unknown failure modes. b) Schedule pressure to accommodate ISS program- Next tank still at MAF c)Limited ET resources. III. How d We Do It?: a) Developed unique engineering requirements and tooling to minimize repairs. b) Performed large amount of performance testing to demonstrate understanding of repairs and residual conditions. c) Effectively communicated results to technical community and management to instill confidence in expected performance.

  12. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our

  13. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2010-12

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2015

    2015-01-01

    "Title III" of the "Elementary and Secondary Education Act" ("ESEA") provides formula grants to states to help support the educational needs of students identified as English learners (ELs). In school year (SY) 2011-12, ELs served by "Title III"-funded activities comprised approximately 9 percent of the…

  14. Software Schedules Missions, Aids Project Management

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  15. Grid scheduling divisible loads from two sources

    SciTech Connect

    Moges, M.A.; Yu, D.; Robertazzi, T.

    2009-07-10

    To date closed form solutions for optimal finish time and job allocation are largely obtained only for network topologies with a single load originating (root) processor. However in large-scale data intensive problems with geographically distributed resources, load is generated from multiple sources. This paper introduces a new divisible load scheduling strategy for single level tree networks with two load originating processors. Solutions for an optimal allocation of fractions of load to nodes in single level tree networks are obtained via linear programming. A unique scheduling strategy that allows one to obtain closed form solutions for the optimal finish time and load allocation for each processor in the network is also presented. The tradeoff between linear programming and closed form solutions in terms of underlying assumptions is examined. Finally, a performance evaluation of a two source homogeneous single level tree network with concurrent communication strategy is presented.

  16. Integrated scheduling and resource management. [for Space Station Information System

    NASA Technical Reports Server (NTRS)

    Ward, M. T.

    1987-01-01

    This paper examines the problem of integrated scheduling during the Space Station era. Scheduling for Space Station entails coordinating the support of many distributed users who are sharing common resources and pursuing individual and sometimes conflicting objectives. This paper compares the scheduling integration problems of current missions with those anticipated for the Space Station era. It examines the facilities and the proposed operations environment for Space Station. It concludes that the pattern of interdependecies among the users and facilities, which are the source of the integration problem is well structured, allowing a dividing of the larger problem into smaller problems. It proposes an architecture to support integrated scheduling by scheduling efficiently at local facilities as a function of dependencies with other facilities of the program. A prototype is described that is being developed to demonstrate this integration concept.

  17. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  18. Schedule-induced licking during multiple schedules1

    PubMed Central

    Jacquet, Yasuko Filby

    1972-01-01

    Schedule-induced polydipsia was studied in rats bar pressing under two-component multiple schedules of food reinforcement. The first component of the multiple schedule was a variable-interval 1-min schedule throughout the experiment. The schedule comprising the second component was varied over blocks of sessions in terms of rate and magnitude of reinforcement, and was either variable-interval 3-min (one pellet), variable-interval 3-min (three pellets), variable-interval 1-min (one pellet), or extinction. Water intake per session varied with the rate of reinforcement in the schedule comprising the second component and was highest when the schedule was variable-interval 1-min. Both bar-pressing behavior and licking behavior showed behavioral interactions between the two components of the multiple schedules. With magnitude of reinforcement held constant, a matching relationship was observed between lick rate and reinforcement rate; the relative frequency of licks in the constant component matched the relative frequency of reinforcement in that component. Bar pressing, however, showed only a moderate degree of relativity matching. During the schedule-induced licking, a burst of licking followed each delivery of a pellet (post-prandial drinking). The duration of these bursts of licking was observed to be a function of the inter-reinforcement interval. PMID:16811598

  19. XOPPS - OEL PROJECT PLANNER/SCHEDULER TOOL

    NASA Technical Reports Server (NTRS)

    Mulnix, C. L.

    1994-01-01

    XOPPS is a window-based graphics tool for scheduling and project planning that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays the full image of the schedule being edited. The canvas contains a header area for text and a schedule area for plotting graphic representations of milestone objects in a flexible timeline. XOPPS is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided with the capability to automatically convert a milestone event to a slip. A milestone schedule on another computer can be saved to an ASCII file to be read by XOPPS. The program can print a schedule to a PostScript file. Dependencies between objects can also be displayed on the chart through the use of precedence lines. This program is not intended to replace a commercial scheduling/project management program. Because XOPPS has

  20. Minimizing metastatic risk in radiotherapy fractionation schedules

    NASA Astrophysics Data System (ADS)

    Badri, Hamidreza; Ramakrishnan, Jagdish; Leder, Kevin

    2015-11-01

    Metastasis is the process by which cells from a primary tumor disperse and form new tumors at distant anatomical locations. The treatment and prevention of metastatic cancer remains an extremely challenging problem. This work introduces a novel biologically motivated objective function to the radiation optimization community that takes into account metastatic risk instead of the status of the primary tumor. In this work, we consider the problem of developing fractionated irradiation schedules that minimize production of metastatic cancer cells while keeping normal tissue damage below an acceptable level. A dynamic programming framework is utilized to determine the optimal fractionation scheme. We evaluated our approach on a breast cancer case using the heart and the lung as organs-at-risk (OAR). For small tumor α /β values, hypo-fractionated schedules were optimal, which is consistent with standard models. However, for relatively larger α /β values, we found the type of schedule depended on various parameters such as the time when metastatic risk was evaluated, the α /β values of the OARs, and the normal tissue sparing factors. Interestingly, in contrast to standard models, hypo-fractionated and semi-hypo-fractionated schedules (large initial doses with doses tapering off with time) were suggested even with large tumor α/β values. Numerical results indicate the potential for significant reduction in metastatic risk.