Science.gov

Sample records for iii program scheduling

  1. Schedule-Organizer Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Organizer provides simple method for generating distribution lists. Contains readers' names for each task schedule defined by input files. Schedule Organizer (SO), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  2. Schedule-Tracker Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Tracker provides effective method for tracking tasks "past due" and/or "near term". Generates reports for each responsible staff member having one or more assigned tasks falling within two listed categories. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  3. SO - SCHEDULE ORGANIZER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer SO, Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. SO contains the following primary menu that is displayed at the beginning of the program. The menu provides options: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds twenty-five groups of up to twenty-five names for each group. The other file holds twenty-five records, each of which may hold a task schedule title. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout; there is one for each input names file schedule group. The third output file holds the last schedule title deleted by

  4. Schedules of controlled substances: rescheduling of buprenorphine from schedule V to schedule III. Final rule.

    PubMed

    2002-10-01

    This final rule is issued by the Deputy Administrator of the Drug Enforcement Administration (DEA) to reschedule buprenorphine from a Schedule V narcotic to a Schedule III narcotic under the Controlled Substances Act (CSA). This action is based on a rescheduling recommendation by the Department of Health and Human Services (DHHS) and a DEA review indicating that buprenorphine meets the criteria of a Schedule III narcotic. The DEA published a proposed rule to reschedule buprenorphine on March 21, 2002 (67 FR 13114). The comment period was extended for an additional 30 days until May 22, 2002 (67 FR 20072). The DEA received ten comments but no requests for hearings. This final action will impose the regulatory controls and criminal sanctions of a Schedule III narcotic on those persons who handle buprenorphine or products containing buprenorphine PMID:12369590

  5. ST - SCHEDULE TRACKER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST, and Schedule Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum numbers can be modified by the user. ST requires the VMS Operating System on DEC VAX and was written in PL/1 and DEC Command Language (DCL). The program requires a memory of 233KB. ST can be purchased separately or in a package (COSMIC Program COS-10021) containing SO, ST, and SRG. ST was developed in 1985.

  6. S-CHART - SCHEDULING CHART PROGRAM

    NASA Technical Reports Server (NTRS)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  7. Schedule-Report-Generator Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Report Generator provides simple method for generating periodic schedule reports. Enables engineering manager to monitor tasks assigned to staff members on weekly basis. Sorts three types of reports by use of one or more data fields as sorting keys. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  8. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  9. 78 FR 62500 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... action is based on a recommendation from the Assistant Secretary for Health of the Department of Health... classified into one of five schedules based upon their potential for abuse, their currently accepted medical... (Schedule III). According to the HHS, based on results from the clinical study with recreational drug...

  10. Schedules of controlled substances: rescheduling of hydrocodone combination products from schedule III to schedule II. Final rule.

    PubMed

    2014-08-22

    With the issuance of this final rule, the Administrator of the Drug Enforcement Administration reschedules hydrocodone combination products from schedule III to schedule II of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule II controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, conduct chemical analysis with, or possess) or propose to handle hydrocodone combination products. PMID:25167591

  11. 77 FR 60743 - Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Internal Revenue Service Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040... Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Schedule F... Number: Schedule F, Part II and III (Form 1040). Abstract: Schedule F, Part II and III (Form 1040)...

  12. Resupply Scheduler Program Using Integer Optimization

    NASA Technical Reports Server (NTRS)

    Viterna, L. A.; Reed, D. M.

    1994-01-01

    Resupply Scheduling Modeler (RSM) fully menu-driven computer program using integer programming techniques to determine optimum schedule for replacing components on or before ends of fixed replacement periods. Written to analyze electrical power system on Space Station Freedom, also used to model resupply of almost any system subject to user-defined constraints on resources. Lifetimes of components, assembly schedules, and other constraints taken into account. Written in APL2(R).

  13. 78 FR 72013 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... the CSA, with the concurrence of NIDA. 50 FR 9518, Mar. 8, 1995. In addition, because the Secretary of... Perampanel into Schedule III'' on October 22, 2013 (78 FR 62500), which proposed placement of perampanel in... partial-onset seizures with or without secondarily generalized seizures in patients with epilepsy aged...

  14. Schedules of controlled substances: placement of perampanel into Schedule III. Final rule.

    PubMed

    2013-12-01

    With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration (DEA) places the substance perampanel [2-(2-oxo-1-phenyl-5-pyridin-2-yl-1,2-dihydropyridin-3-yl) benzonitrile], including its salts, isomers, and salts of isomers, into schedule III of the Controlled Substances Act (CSA). This scheduling action is pursuant to the CSA which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule III controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, or possess) or propose to handle perampanel. PMID:24294637

  15. SO/ST/SRG - SCHEDULING PROGRAMS

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Organizer contains a primary menu that is displayed at the beginning of the program. The menu provides options as follows: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds 25 groups of up to 25 names for each group. The other file holds 25 records. Each 60-character-long record holds a task schedule title or it is a blank entry. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout. There is one for each input names file schedule group. The third output file holds the schedule title of the last schedule title file deleted by the user. Schedule Tracker provides an effective method for tracking tasks that are "past due" and/or "near term". ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term

  16. Adapting Scheduling Programs for Educational Specifications.

    ERIC Educational Resources Information Center

    Glass, Thomas E.

    1984-01-01

    Planners of a new Arizona school used the district's existing computerized master scheduling program to identify instructional spaces needed. Total classroom needs by subject were translated into total square footage requirements. (MLF)

  17. SRG - SCHEDULE REPORT GENERATOR COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Schedule Report Generator, SRG, are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are schedule for recent completion (near term). Schedule Reports Generator provides a simple method for generating periodic schedule reports. SRG enables an engineering manager to monitor tasks assigned to staff members on a weekly basis. SRG sorts three types of reports using one or more data fields as sort keys. One type is sorted using the calendar year as the primary key and the end date as the secondary key. Another type is sorted by flight number. A third type of report, Waterfall plots, is also generated by SRG using the end date as the sorting key. SRG requires as input a single file or two concatenated files with up to 400 single line entries. The user constructs the input file by using the LSE editor VAX utility prior to the execution of the program. The user is able to modify the current functional description text lines just displayed. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum

  18. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  19. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  20. Long term fuel scheduling linear programming

    SciTech Connect

    Asgarpoor, S. . Dept. of Electrical Engineering); Gul, N. )

    1992-01-01

    This paper presents an application of linear programming (LP) revised simplex method in order to solve the fuel scheduling problem. A regression method is applied to determine the polynomial cost curves, and a separable programming technique is used to linearize the objective function and the constraints for LP application. Results based on sample data obtained from Omaha Public Power District (OPPD) are presented to demonstrate the LP application to this problem.

  1. Runway Scheduling Using Generalized Dynamic Programming

    NASA Technical Reports Server (NTRS)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  2. 75 FR 67054 - Listing of Approved Drug Products Containing Dronabinol in Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ...\\ 51 FR 17476 (May 13, 1986). DEA subsequently transferred the FDA-approved Marinol formulation from schedule II to schedule III. 64 FR 35928 (July 2, 1999). Recently, firms have submitted to FDA ANDAs for... Health and Human Services (DHHS) with requests for scientific and medical evaluation and...

  3. On program restructuring, scheduling, and communication for parallel processor systems

    SciTech Connect

    Polychronopoulos, Constantine D.

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, these algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented. 69 refs., 74 figs., 14 tabs.

  4. 76 FR 5830 - FBI Records Management Division; National Name Check Program Section; New User Fees Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... Federal Bureau of Investigation FBI Records Management Division; National Name Check Program Section; New User Fees Schedule AGENCY: Federal Bureau of Investigation (FBI), Justice. ACTION: Notice. SUMMARY... effective on March 4, 2011. Dated: January 25, 2011. Robert S. Mueller, III, Director, Federal Bureau...

  5. Master schedule for CY-1981 Hanford environmental surveillance routine program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites. (JGB)

  6. Application of fuzzy linear programming to maintenance scheduling

    SciTech Connect

    Noor, S.F.; McDonald, J.R.

    1995-10-01

    In this paper initially, methods of fuzzy linear programming are discussed, which is then followed by an explanation of fuzzy 0-1 programming and finally the authors show how this method is applied to maintenance scheduling of a series of generators. Fuzzy linear 0-1 programming may be used for maintenance scheduling of generating units, this makes it possible to represent some of the maintenance constraints in flexible form and hence better suited to the requirements of maintenance personnel.

  7. An Assessment of a Senior High School Modular Scheduling Program.

    ERIC Educational Resources Information Center

    Hicken, James E.

    Modular scheduling was introduced in the academic year 1967-68 at North Miami Senior High School. After a year's operation under the Stanford School Scheduling System, an "at home" evaluation of the new program was made. Student grades on a cross-sectional basis did not suffer, but rather showed a slight improvement. Moderate improvement was also…

  8. Master schedule for CY-1982 Hanford environmental surveillance routine program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites. (ATT)

  9. International Space Programs. Aerospace Education III.

    ERIC Educational Resources Information Center

    Bulmer, S. B.

    This book, one in the series on Aerospace Education III, is a collection of the diverse information available regarding the international space programs. The five goals listed for the book are: to examine the Soviet space program, to understand the future of Soviet space activity, to examine other national and international space programs, to…

  10. 33 CFR Schedule III to Subpart A... - Calling-in Table

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Schedule III to Subpart A of Part 401—Calling-in Table C.I.P. and checkpoint Station to call Message... to Subpart A of Part 401 Navigation and Navigable Waters SAINT LAWRENCE SEAWAY DEVELOPMENT... 1. Name of vessel.2. Location. 3. ETA Cape Vincent or River Port. 15. Whale back Shoal—Con...

  11. Scheduling IT staff at a bank: a mathematical programming approach.

    PubMed

    Labidi, M; Mrad, M; Gharbi, A; Louly, M A

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  12. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    PubMed Central

    Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  13. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  14. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  15. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  16. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  17. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  18. The Berkeley SETI Program: SERENDIP III

    NASA Astrophysics Data System (ADS)

    Donnelly, C.; Bowyer, S.; Werthimer, D.; Ng, D.; Cobb, J.

    1993-05-01

    The Berkeley SETI (Search for Extraterrestrial Intelligence) program, named SERENDIP, was begun in the late 1970's. It is aimed at detecting narrow band radio signals from extraterrestrial civilizations. The SERENDIP I, II and III systems have operated autonomously in a piggyback search mode, conducting unobtrusive, long-term observations on the world's largest radio telescopes. The latest generation SERENDIP instrument, SERENDIP III, is a four million channel FFT-based spectrum analyzer operating at 0.6 Hz resolution with a 1.7 second integration time. SERENDIP III has been operating at the NAIC Arecibo Observatory since April, 1992. Several independent criteria suggest that this search is the most sensitive SETI search in operation. To date SERENDIP III has accumulated over 3600 hours of high quality telescope time, observing 75% of the sky visible by the Arecibo telescope. Over this period SERENDIP III has analyzed over 30 trillion spectral bins, and recorded information on 110 million strong narrow band signals in the 424--435 MHz band. A handful of these signals have survived our RFI rejection and signal detection algorithms, and have thus been added to our list of ETI candidate signals. A follow-up observation program will be conducted next year in an attempt to verify each of these candidate signals. This work has been supported by NASA grant NAGW-2722.

  19. TRU Waste Management Program cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A. . Joint Integration Office); Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A. Corp., Boulder, CO )

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementation would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)

  20. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    SciTech Connect

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  1. A Mixed Integer Linear Program for Airport Departure Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Jung, Yoon Chul

    2009-01-01

    Aircraft departing from an airport are subject to numerous constraints while scheduling departure times. These constraints include wake-separation constraints for successive departures, miles-in-trail separation for aircraft bound for the same departure fixes, and time-window or prioritization constraints for individual flights. Besides these, emissions as well as increased fuel consumption due to inefficient scheduling need to be included. Addressing all the above constraints in a single framework while allowing for resequencing of the aircraft using runway queues is critical to the implementation of the Next Generation Air Transport System (NextGen) concepts. Prior work on airport departure scheduling has addressed some of the above. However, existing methods use pre-determined runway queues, and schedule aircraft from these departure queues. The source of such pre-determined queues is not explicit, and could potentially be a subjective controller input. Determining runway queues and scheduling within the same framework would potentially result in better scheduling. This paper presents a mixed integer linear program (MILP) for the departure-scheduling problem. The program takes as input the incoming sequence of aircraft for departure from a runway, along with their earliest departure times and an optional prioritization scheme based on time-window of departure for each aircraft. The program then assigns these aircraft to the available departure queues and schedules departure times, explicitly considering wake separation and departure fix restrictions to minimize total delay for all aircraft. The approach is generalized and can be used in a variety of situations, and allows for aircraft prioritization based on operational as well as environmental considerations. We present the MILP in the paper, along with benefits over the first-come-first-serve (FCFS) scheme for numerous randomized problems based on real-world settings. The MILP results in substantially reduced

  2. Program partitioning and scheduling for NUMA computer architectures

    SciTech Connect

    Wolski, R.M.

    1994-03-01

    To effect the parallel execution of a program on a multiprocessor, each of the program`s constituent computations must be assigned to a processing resource within the multiprocessor. The problem of making this assignment so that execution time is minimized (known as the mapping problem) has been shown to be NP-complete. However, heuristics based on the performance characteristics of the target multiprocessor can yield execution times that approach the minimum possible. The mapping problem can be divided in to the problem of partitioning the computations into sequential threads, and the problem of scheduling those threads on the processors of the target system. This dissertation presents a logical framework and a set of heuristics that operate within the framework for the automatic partitioning and scheduling of programs at compile-time. The framework is based on the memory-node execution model which correctly captures the interaction between computations, processors, and the communication resources within a multiprocessor. The CP and HEF heuristics manipulate the features of the memory-node model to produce efficient program mappings. The effectiveness of the partitioning and scheduling techniques is investigated for Non-uniform Memory Access (NUMA) architecture types. To test the versatility of the approach, results are presented both for processors implementing strict execution semantics, and non-strict load/store semantics popular with RISC systems. The partitioner and scheduler are also used to investigate the possible advantages of multithreading (using either hardware or software), and the effectiveness of massively parallel systems, within a scientific programming context.

  3. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  4. Schedule Optimization Study, Hanford RI/FS Program

    SciTech Connect

    Not Available

    1992-12-01

    A Schedule Optimization Study (SOS) of the US Department of Energy (DOE) Hanford Site Remedial Investigation/Feasibility Study (RI/FS) Program was conducted by an independent team of professionals from other federal agencies and the private sector experienced in environmental restoration. This team spent two weeks at Hanford in September 1992 examining the reasons for the lengthy RI/FS process at Hanford and developing recommendations to expedite the process. The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit RI/FS Work Plan. This report documents the study called for in the August 29, 1991, Dispute Resolution Committee Decision Statement. Battelle's Environmental Management Operations (EMO) coordinated the effort for DOE's Richland Field Office (RL).

  5. Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles H.

    2012-01-01

    We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

  6. A new mathematical programming model for scheduling flexible manufacturing systems

    SciTech Connect

    MacCarthy, B.; Liu, J.

    1994-12-31

    Flexibility is now a major consideration in the design of many manufacturing systems. Flexible manufacturing systems (FMS) have been developed in the last two decades. The principal elements of an FMS are (1) computer controlled machine tools, (2) a transport system and (3) a host computer system. Such systems may combine high flexibility with high productivity and may allow unsupervised production. However, in order to achieve these benefits, the control system must be capable of exercising intelligent supervisory management. Scheduling is at the heart of the control system and is still a major problem area. This paper describes a new mathematical programming model for a wide class of FMS scheduling problems based on a new classification scheme. A global optimization approach is adopted based on a mixed-integer linear programming model. Many important aspects of operational FMS, omitted form earlier models, are included. Key elements of model structure are highlighted. Computational experience with a comprehensive set of designed experiments is described. The applications of the model are noted and the development of effective heuristic procedures based on the model is highlighted.

  7. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  8. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  9. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  10. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  11. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  12. Advanced Emissions Control Development Program: Phase III

    SciTech Connect

    G.T. Amrhein; R.T. Bailey; W. Downs; M.J. Holmes; G.A. Kudlac; D.A. Madden

    1999-07-01

    The primary objective of the Advanced Emissions Control Development Program (AECDP) is to develop practical, cost-effective strategies for reducing the emissions of air toxics from coal-fired boilers. The project goal is to effectively control air toxic emissions through the use of conventional flue gas clean-up equipment such as electrostatic precipitators (ESPs), fabric filters (baghouses - BH), and wet flue gas desulfurization systems (WFGD). Development work concentrated on the capture of trace metals, fine particulate, hydrogen chloride and hydrogen fluoride, with an emphasis on the control of mercury. The AECDP project is jointly funded by the US Department of Energy's Federal Energy Technology Center (DOE), the Ohio Coal Development Office within the Ohio Department of Development (OCDO), and Babcock and Wilcox, a McDermott company (B and W). This report discusses results of all three phases of the AECDP project with an emphasis on Phase III activities. Following the construction and evaluation of a representative air toxics test facility in Phase I, Phase II focused on characterization of the emissions of mercury and other air toxics and the control of these emissions for typical operating conditions of conventional flue gas clean-up equipment. Some general comments that can be made about the control of air toxics while burning a high-sulfur bituminous coal are as follows: (1) particulate control devices such as ESP's and baghouses do a good job of removing non-volatile trace metals, (2) particulate control devices (ESPs and baghouses) effectively remove the particulate-phase mercury, but the particulate-phase mercury was only a small fraction of the total for the coals tested, (3) wet scrubbing can effectively remove hydrogen chloride and hydrogen fluoride, and (4) wet scrubbers show good potential for the removal of mercury when operated under certain conditions, however, for certain applications, system enhancements can be required to achieve high

  13. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results.

  14. Santa Fe Bilingual-Bicultural Education Program. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Ludanyi, R. P.; Ehrlich, Roselin

    This content analysis schedule for the Santa Fe Bilingual-Bicultural Education Program of Santa Fe, New Mexico, presents information on the history, funding, and scope of the project in its second year. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is…

  15. Mixed Integer Programming and Heuristic Scheduling for Space Communication

    NASA Technical Reports Server (NTRS)

    Lee, Charles H.; Cheung, Kar-Ming

    2013-01-01

    Optimal planning and scheduling for a communication network was created where the nodes within the network are communicating at the highest possible rates while meeting the mission requirements and operational constraints. The planning and scheduling problem was formulated in the framework of Mixed Integer Programming (MIP) to introduce a special penalty function to convert the MIP problem into a continuous optimization problem, and to solve the constrained optimization problem using heuristic optimization. The communication network consists of space and ground assets with the link dynamics between any two assets varying with respect to time, distance, and telecom configurations. One asset could be communicating with another at very high data rates at one time, and at other times, communication is impossible, as the asset could be inaccessible from the network due to planetary occultation. Based on the network's geometric dynamics and link capabilities, the start time, end time, and link configuration of each view period are selected to maximize the communication efficiency within the network. Mathematical formulations for the constrained mixed integer optimization problem were derived, and efficient analytical and numerical techniques were developed to find the optimal solution. By setting up the problem using MIP, the search space for the optimization problem is reduced significantly, thereby speeding up the solution process. The ratio of the dimension of the traditional method over the proposed formulation is approximately an order N (single) to 2*N (arraying), where N is the number of receiving antennas of a node. By introducing a special penalty function, the MIP problem with non-differentiable cost function and nonlinear constraints can be converted into a continuous variable problem, whose solution is possible.

  16. Quarterly report on program cost and schedule, third quarter FY 1992

    SciTech Connect

    1992-10-01

    This report is intended to provide a summary of the cost and schedule performance for the civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from the DOE Financial information System) are presented for each of the major program elements. Also included in this report are the program schedule baseline, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through June 1992.

  17. DOTSYS III: A Portable Program for Braille Translation. Rev. 1.

    ERIC Educational Resources Information Center

    Sullivan, Joseph E., Ed.; And Others

    DOTSYS III is a COBOL program for the translation of English text into standard English braille, also known as grade 2 braille. Text in foreign languages or English may be transliterated as grade 1 braille or "computer" braille. The program's method of operation together with instructions on using the program, modifying or extending the…

  18. GA-based discrete dynamic programming approach for scheduling in FMS environments.

    PubMed

    Yang, J B

    2001-01-01

    The paper presents a new genetic algorithm (GA)-based discrete dynamic programming (DDP) approach for generating static schedules in a flexible manufacturing system (FMS) environment. This GA-DDP approach adopts a sequence-dependent schedule generation strategy, where a GA is employed to generate feasible job sequences and a series of discrete dynamic programs are constructed to generate legal schedules for a given sequence of jobs. In formulating the GA, different performance criteria could be easily included. The developed DDF algorithm is capable of identifying locally optimized partial schedules and shares the computation efficiency of dynamic programming. The algorithm is designed In such a way that it does not suffer from the state explosion problem inherent in pure dynamic programming approaches in FMS scheduling. Numerical examples are reported to illustrate the approach. PMID:18244848

  19. Community College Exemplary Instructional Programs, Volume III.

    ERIC Educational Resources Information Center

    Fideler, Elizabeth F., Ed.; Bazer, Gerald, Ed.

    Third in an annual series, this volume presents brief descriptions of a number of outstanding community college instructional programs identified by the National Council of Instructional Administrators (NCIA). Each description includes the address and telephone number of the college in which the program operates, and the names of the college…

  20. Human Development Program: Level III Activity Guide.

    ERIC Educational Resources Information Center

    Bessell, Harold

    The curriculum guide presents the activities component of the Human Development Program for the third grade. The Human Development Program (HDP) is an affective curricular approach developed by psychologists to help teachers instill responsibility and self-confidence in children. Following a brief overview of the HDP and explanation of the Magic…

  1. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    ERIC Educational Resources Information Center

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic background of…

  2. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes.

  3. Interdisciplinary Studies Program. Teacher's Guide: Part III.

    ERIC Educational Resources Information Center

    Valencia Community Coll., Orlando, FL.

    This teacher's guide was developed for the third of four courses in Valencia Community College's Interdisciplinary Studies program, a 2-year core general education curriculum which chronologically examines the major developments in the evolution of human knowledge. The guide provides an introductory overview of the course's topic (i.e., Western…

  4. Environmental Technology Verification (ETV) Program Case Studies: Demonstrating Program Outcomes, Volume III

    EPA Science Inventory

    This booklet, ETV Program Case Studies: Demonstrating Program Outcomes, Volume III contains two case studies, addressing verified environmental technologies for decentalized wastewater treatment and converting animal waste to energy. Each case study contains a brief description ...

  5. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  6. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    SciTech Connect

    Not Available

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  7. Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

    NASA Technical Reports Server (NTRS)

    Bonine, Lauren

    2015-01-01

    The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

  8. Students in Cohort Programs and Intensive Schedule Classes: Does Familiarity Breed Differences? ASHE Annual Meeting Paper.

    ERIC Educational Resources Information Center

    Reynolds, Katherine C.

    Changing student demographics in higher education, especially increased numbers of older and/or working students, have inspired experimentation with a variety of class scheduling and degree program formats. This study investigated two such formats: (1) cohort programs (requiring students to take all or nearly all courses together toward a degree)…

  9. A model for estimating the cost impact of schedule perturbations on aerospace research and development programs

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1972-01-01

    The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.

  10. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  11. Quarterly report on program cost and schedule, second quarter FY 1990

    SciTech Connect

    1990-08-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical and current cost profiles are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through March 1990. 1 fig.

  12. DUAL ALKALI TEST AND EVALUATION PROGRAM. VOLUME III. PROTOTYPE TEST PROGRAM--PLANT SCHOLZ

    EPA Science Inventory

    Volume III of the report covers Task III of a three-task program to investigate, characterize, and evaluate the basic process chemistry and the various operating modes of sodium-based dual alkali scrubbing processes. The tasks were: (I) laboratory studies at both Arthur D. Little...

  13. Programmed schedule holds for improving launch vehicle holds

    NASA Technical Reports Server (NTRS)

    Gralow, F. H.; Hayes, J. D.; Streiff, M. A.; Temple, A. G.; Venditti, R. A.

    1969-01-01

    Baseline definition and system optimization are used for the analysis of programmed holds developed through prelaunch system analysis. Identification of design specifications for ground support equipment and maintenance concepts, and design specifications are used to describe the functional utilization of the overall flow process.

  14. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  15. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  16. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 2 2014-01-01 2014-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  17. Creation of the selection list for the Experiment Scheduling Program (ESP)

    NASA Technical Reports Server (NTRS)

    Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.

    1986-01-01

    The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.

  18. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  19. Automatic programming via iterated local search for dynamic job shop scheduling.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism. PMID:24802623

  20. 78 FR 41785 - Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program... notice will be considered public records. Title of Collection: Implementation of Title I/II Program... Estimated Number of Annual Burden Hours: 6,573. Abstract: The Implementation of Title I/II...

  1. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program.

  2. Fair Energy Scheduling for Vehicle-to-Grid Networks Using Adaptive Dynamic Programming.

    PubMed

    Xie, Shengli; Zhong, Weifeng; Xie, Kan; Yu, Rong; Zhang, Yan

    2016-08-01

    Research on the smart grid is being given enormous supports worldwide due to its great significance in solving environmental and energy crises. Electric vehicles (EVs), which are powered by clean energy, are adopted increasingly year by year. It is predictable that the huge charge load caused by high EV penetration will have a considerable impact on the reliability of the smart grid. Therefore, fair energy scheduling for EV charge and discharge is proposed in this paper. By using the vehicle-to-grid technology, the scheduler controls the electricity loads of EVs considering fairness in the residential distribution network. We propose contribution-based fairness, in which EVs with high contributions have high priorities to obtain charge energy. The contribution value is defined by both the charge/discharge energy and the timing of the action. EVs can achieve higher contribution values when discharging during the load peak hours. However, charging during this time will decrease the contribution values seriously. We formulate the fair energy scheduling problem as an infinite-horizon Markov decision process. The methodology of adaptive dynamic programming is employed to maximize the long-term fairness by processing online network training. The numerical results illustrate that the proposed EV energy scheduling is able to mitigate and flatten the peak load in the distribution network. Furthermore, contribution-based fairness achieves a fast recovery of EV batteries that have deeply discharged and guarantee fairness in the full charge time of all EVs. PMID:26930694

  3. The JUPITER-III Program: ANL analysis of ZPPR-17

    SciTech Connect

    Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.; Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.

    1989-01-31

    The ZPPR-17 assembly was part of the JUPITER-III cooperative program between the US DOE and PNC of Japan. The assembly was designed to study the neutronic behavior of a large, axially heterogeneous, liquid-metal-cooled reactor. The unique feature of the assembly was an internal blanket region in the axial center of the core extending two-thirds of the core radius. Assembly variants with 25 control rod positions and with 13 half-inserted control rods were built. This report describes in detail the results of measurements and analyses of ZPPR-17. The measurements emphasized reaction rate distributions, and gamma dose measurements were included. Additional measurements were control worth, sodium void worth, and reactivity coefficients associated with small material motions in assembly expansion and bowing.

  4. Schedule Optimization Study, Hanford RI/FS Program. Volume 2, Final report

    SciTech Connect

    Not Available

    1992-12-01

    A Schedule Optimization Study (SOS) of the US Department of Energy (DOE) Hanford Site Remedial Investigation/Feasibility Study (RI/FS) Program was conducted by an independent team of professionals from other federal agencies and the private sector experienced in environmental restoration. This team spent two weeks at Hanford in September 1992 examining the reasons for the lengthy RI/FS process at Hanford and developing recommendations to expedite the process. The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit RI/FS Work Plan. This report documents the study called for in the August 29, 1991, Dispute Resolution Committee Decision Statement. Battelle`s Environmental Management Operations (EMO) coordinated the effort for DOE`s Richland Field Office (RL).

  5. Integrating an HTLV-III Screening Program into a Community Based Family Health Service Agency.

    ERIC Educational Resources Information Center

    Klausmeier, Walter W.; Henshaw, Beverly

    Acquired Immune Deficiency Syndrome (AIDS) has become one of the most serious epidemic disease problems in recent years. In 1985 the Public Health Service recommended establishment of test sites where individuals might be tested for Human T Lymphotropic Virus III (HTLV-III) antibody. An HTLV-III antibody screening program was integrated into a…

  6. The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.

    2004-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  7. The Swift Project Contamination Control Program: A Case study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane; Secunda, Mark

    2003-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  8. Prioritized schedule for review of industrial safety and occupational health programs

    SciTech Connect

    1996-12-01

    This document provides the rationale and criteria for developing a schedule for reviewing the Industrial Safety and Occupational Health programs for the Management and Operating Contractor (MOC) of the Waste Isolation Pilot Plant. The reviews will evaluate the MOC`s compliance with applicable Department of Energy (DOE) orders and regulatory requirements. The scope of this task includes developing prioritization criteria, determining the review priority of each program based upon the criteria, identifying review requirements for each program, and preparing a detailed review schedule. In keeping with the Carlsbad Area Office (CAO) structure for the review of site activities, these review activities will be addressed as surveillances, although the original basis for this requirement refers to these activities as appraisals. Surveillances and appraisals are the same within this document. Surveillances are defined as: ``The act of monitoring or observing to verify whether an item, activity, system, or process conforms to specified requirements. Surveillance of a technical work activity is normally done in real time, i.e., the surveillance is accomplished as the work is being performed.``

  9. A Two-Stage Stochastic Mixed-Integer Programming Approach to the Smart House Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Ozoe, Shunsuke; Tanaka, Yoichi; Fukushima, Masao

    A “Smart House” is a highly energy-optimized house equipped with photovoltaic systems (PV systems), electric battery systems, fuel cell cogeneration systems (FC systems), electric vehicles (EVs) and so on. Smart houses are attracting much attention recently thanks to their enhanced ability to save energy by making full use of renewable energy and by achieving power grid stability despite an increased power draw for installed PV systems. Yet running a smart house's power system, with its multiple power sources and power storages, is no simple task. In this paper, we consider the problem of power scheduling for a smart house with a PV system, an FC system and an EV. We formulate the problem as a mixed integer programming problem, and then extend it to a stochastic programming problem involving recourse costs to cope with uncertain electricity demand, heat demand and PV power generation. Using our method, we seek to achieve the optimal power schedule running at the minimum expected operation cost. We present some results of numerical experiments with data on real-life demands and PV power generation to show the effectiveness of our method.

  10. Fuzzy linear programming based optimal fuel scheduling incorporating blending/transloading facilities

    SciTech Connect

    Djukanovic, M.; Babic, B.; Milosevic, B.; Sobajic, D.J.; Pao, Y.H. |

    1996-05-01

    In this paper the blending/transloading facilities are modeled using an interactive fuzzy linear programming (FLP), in order to allow the decision-maker to solve the problem of uncertainty of input information within the fuel scheduling optimization. An interactive decision-making process is formulated in which decision-maker can learn to recognize good solutions by considering all possibilities of fuzziness. The application of the fuzzy formulation is accompanied by a careful examination of the definition of fuzziness, appropriateness of the membership function and interpretation of results. The proposed concept provides a decision support system with integration-oriented features, whereby the decision-maker can learn to recognize the relative importance of factors in the specific domain of optimal fuel scheduling (OFS) problem. The formulation of a fuzzy linear programming problem to obtain a reasonable nonfuzzy solution under consideration of the ambiguity of parameters, represented by fuzzy numbers, is introduced. An additional advantage of the FLP formulation is its ability to deal with multi-objective problems.

  11. A Mixed Integer Linear Program for Solving a Multiple Route Taxi Scheduling Problem

    NASA Technical Reports Server (NTRS)

    Montoya, Justin Vincent; Wood, Zachary Paul; Rathinam, Sivakumar; Malik, Waqar Ahmad

    2010-01-01

    Aircraft movements on taxiways at busy airports often create bottlenecks. This paper introduces a mixed integer linear program to solve a Multiple Route Aircraft Taxi Scheduling Problem. The outputs of the model are in the form of optimal taxi schedules, which include routing decisions for taxiing aircraft. The model extends an existing single route formulation to include routing decisions. An efficient comparison framework compares the multi-route formulation and the single route formulation. The multi-route model is exercised for east side airport surface traffic at Dallas/Fort Worth International Airport to determine if any arrival taxi time savings can be achieved by allowing arrivals to have two taxi routes: a route that crosses an active departure runway and a perimeter route that avoids the crossing. Results indicate that the multi-route formulation yields reduced arrival taxi times over the single route formulation only when a perimeter taxiway is used. In conditions where the departure aircraft are given an optimal and fixed takeoff sequence, accumulative arrival taxi time savings in the multi-route formulation can be as high as 3.6 hours more than the single route formulation. If the departure sequence is not optimal, the multi-route formulation results in less taxi time savings made over the single route formulation, but the average arrival taxi time is significantly decreased.

  12. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  13. A methodology for the evaluation of program cost and schedule risk for the SEASAT program

    NASA Technical Reports Server (NTRS)

    Abram, P.; Myers, D.

    1976-01-01

    An interactive computerized project management software package (RISKNET) is designed to analyze the effect of the risk involved in each specific activity on the results of the total SEASAT-A program. Both the time and the cost of each distinct activity can be modeled with an uncertainty interval so as to provide the project manager with not only the expected time and cost for the completion of the total program, but also with the expected range of costs corresponding to any desired level of significance. The nature of the SEASAT-A program is described. The capabilities of RISKNET and the implementation plan of a RISKNET analysis for the development of SEASAT-A are presented.

  14. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  15. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  16. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  17. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  18. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  19. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false State administered program-Class I, III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Nebraska § 147.1401...

  20. BASIC Simulation Programs; Volumes III and IV. Mathematics, Physics.

    ERIC Educational Resources Information Center

    Digital Equipment Corp., Maynard, MA.

    The computer programs presented here were developed as a part of the Huntington Computer Project. They were tested on a Digital Equipment Corporation TSS-8 time-shared computer and run in a version of BASIC. Mathematics and physics programs are presented in this volume. The 20 mathematics programs include ones which review multiplication skills;…

  1. 78 FR 48995 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ...This document corrects technical errors that appeared in the final rule with comment period published in the Federal Register on November 16, 2012, entitled ``Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to-Face Encounters, Elimination of the Requirement for Termination of Non-Random Prepayment Complex Medical Review and Other Revisions to Part B......

  2. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated... 10 Energy 2 2011-01-01 2011-01-01 false Physical Protection of Irradiated Reactor Fuel in...

  3. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated..., Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. D Appendix D to Part 73—Physical Protection...

  4. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated..., Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. D Appendix D to Part 73—Physical Protection...

  5. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated..., Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. D Appendix D to Part 73—Physical Protection...

  6. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 CFR part 73, each licensee who transports or delivers to a carrier for transport irradiated..., Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. D Appendix D to Part 73—Physical Protection...

  7. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  8. SWOG S0221: A Phase III Trial Comparing Chemotherapy Schedules in High-Risk Early-Stage Breast Cancer

    PubMed Central

    Budd, George T.; Barlow, William E.; Moore, Halle C.F.; Hobday, Timothy J.; Stewart, James A.; Isaacs, Claudine; Salim, Muhammad; Cho, Jonathan K.; Rinn, Kristine J.; Albain, Kathy S.; Chew, Helen K.; Burton, Gary V.; Moore, Timothy D.; Srkalovic, Gordan; McGregor, Bradley A.; Flaherty, Lawrence E.; Livingston, Robert B.; Lew, Danika L.; Gralow, Julie R.; Hortobagyi, Gabriel N.

    2015-01-01

    Purpose To determine the optimal dose and schedule of anthracycline and taxane administration as adjuvant therapy for early-stage breast cancer. Patients and Methods A 2 × 2 factorial design was used to test two hypotheses: (1) that a novel continuous schedule of doxorubicin-cyclophosphamide was superior to six cycles of doxorubicin-cyclophosphamide once every 2 weeks and (2) that paclitaxel once per week was superior to six cycles of paclitaxel once every 2 weeks in patients with node-positive or high-risk node-negative early-stage breast cancer. With 3,250 patients, a disease-free survival (DFS) hazard ratio of 0.82 for each randomization could be detected with 90% power with two-sided α = .05. Overall survival (OS) was a secondary outcome. Results Interim analyses crossed the futility boundaries for demonstrating superiority of both once-per-week regimens and once-every-2-weeks regimens. After a median follow-up of 6 years, a significant interaction developed between the two randomization factors (DFS P = .024; OS P = .010) in the 2,716 patients randomly assigned in the original design, which precluded interpretation of the two factors separately. Comparing all four arms showed a significant difference in OS (P = .040) but not in DFS (P = .11), with all treatments given once every 2 weeks associated with the highest OS. This difference in OS seemed confined to patients with hormone receptor–negative/human epidermal growth factor receptor 2 (HER2) –negative tumors (P = .067), with no differences seen with hormone receptor–positive/HER2-negative (P = .90) or HER2-positive tumors (P = .40). Conclusion Patients achieved a similar DFS with any of these regimens. Subset analysis suggests the hypothesis that once-every-2-weeks dosing may be best for patients with hormone receptor–negative/HER2-negative tumors. PMID:25422488

  9. Microcomputerizing Your Paperwork. Part III: Financial Management Programs.

    ERIC Educational Resources Information Center

    Pogrow, Stanley

    1982-01-01

    Examines computerized financial accounting programs that can help administrators with the management of school finances. A detailed chart of financial accounting software packages for microcomputers is included. (JJD)

  10. Model Solar Energy Training Program III. Final Report.

    ERIC Educational Resources Information Center

    Talcott Mountain Science Center, Avon, CT.

    Recognizing that an important key to success of developing solar technologies is the availability of skilled labor to produce, install, and maintain it, the Talcott Mountain Science Center in Avon, Connecticut created a training program for vocational-technical and high school staff. The program's goal was to develop curriculum materials that…

  11. Programs for Infants and Young Children. Part III: Health.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Directed toward the improvement of health care for mothers and young children, this report describes a number of comprehensive programs focused on health and reports on projects which have singled out one or more specific maternal or child health services. Included are descriptions of existing community programs for pregnant schoolgirls, health…

  12. School Bus Routing and Scheduling: When to Use Computer-Assisted Methods and Programs.

    ERIC Educational Resources Information Center

    Walcott, Wayne; And Others

    1986-01-01

    Discusses issues concerning the use of computers in school bus scheduling and routing. Examines the advantages, technical considerations, and costs of changing to a computerized system. Offers a five-point approach toward implementation and includes a table of comparative data for routing and scheduling models for a typical school bus fleet. (IW)

  13. A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling

    NASA Astrophysics Data System (ADS)

    Berthold, Timo; Heinz, Stefan; Lübbecke, Marco E.; Möhring, Rolf H.; Schulz, Jens

    We propose a hybrid approach for solving the resource-constrained project scheduling problem which is an extremely hard to solve combinatorial optimization problem of practical relevance. Jobs have to be scheduled on (renewable) resources subject to precedence constraints such that the resource capacities are never exceeded and the latest completion time of all jobs is minimized.

  14. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    PubMed

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid. PMID:25910254

  15. A Second Year Evaluation of the ESEA Title III Urban Leadership Program.

    ERIC Educational Resources Information Center

    Frerichs, Allen H.

    The Urban Leadership Program, funded under Title III of the Elementary and Secondary Education Act, was carried out among sixth graders at the Albert Einstein School in Chicago, Illinois. The primary purpose of the program was to develop skills and competence to prepare participants for survival and success in a large urban environment. A…

  16. US Department of Energy Office of Civilian Radioactive Waste Management quarterly report on program cost and schedule; First quarter, FY 1992

    SciTech Connect

    1992-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical current cost profiles (extracted from the DOE Financial Information System) are presented for each of the major program elements. Also included in this report are the program schedule baseline, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through December 1991.

  17. DOE-EPRI distributed wind Turbine Verification Program (TVP III)

    SciTech Connect

    McGowin, C.; DeMeo, E.; Calvert, S.

    1997-12-31

    In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Vermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation using smaller {open_quotes}clusters{close_quotes} of wind turbines connected directly to the electricity distribution system. This paper presents an overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.

  18. [Psychosocial rehabilitation at the dawn of the 21st century: III: Interdisciplinary evaluation method and bio-psycho-social schedule].

    PubMed

    Grasset, François; Pomini, Valentino; Favrod, Jérôme; Orita, Alina; Veillon, Henri; Cucchia, Anne-Therèse

    2004-04-01

    During the past 20 years, therapeutic and rehabilitative modalities in the field of psychosocial rehabilitation have been diversified in becoming more specific. We have the possibility to offer individualized rehabilitation programs as well as in the general field of socio-professional goals as in the clinical field according to the patients' needs and personal assets. The content of these programs associates various forms of specialized medical and paramedical services. The indications are established trough a careful assessment. The rehabilitation unit of the University Department of Psychiatry in Lausanne has developed a multidisciplinary assessment method based on the bio-psychosocial integrative model and the vulnerability-stress model in integrating the level of experience of Wood for the analysis of the psychosocial functioning. This results in a structured assessment program, which leads to a multidisciplinary comprehensive assessment (difficulties versus adaptative resources). PMID:15209050

  19. Evaluation Report III: The Robert Noyce Scholarship Program at CSUB

    ERIC Educational Resources Information Center

    Wang, Jianjun

    2013-01-01

    California State University, Bakersfield (CSUB) received funding from National Science Foundation's (NSF) Robert Noyce Teacher Scholarship Program to recruit Noyce Scholars from upper-division science, technology, engineering, and mathematics (STEM) majors, graduate students, and professionals switched to STEM teaching from other fields (NSF…

  20. THE CONTINUOUS FLOW ANALYZER AUTOMATION SYSTEM. PART III -- PROGRAM DOCUMENTATION

    EPA Science Inventory

    This report contains complete documentation for the 21 programs and eight data files of the EPA Continuous Flow Analyzer Automation System. This system can receive lists of samples from the Sample File Control System and return the measured concentrations to that system. It is ca...

  1. A Division III Student-Athlete Academic Support Program Model.

    ERIC Educational Resources Information Center

    Smith, David A.; Herman, William E.

    Varsity student-athletes (SAs) in National Collegiate Athletic Association member institutions encounter obstacles to their academic achievement that non-athletes do not, such as time for physical training and practice, and travel away from campus for games. A program is described that provides support for SAs. The Student-Athlete Academic Support…

  2. Hawaii Integrated Biofuels Research Program: Final Subcontract Report, Phase III

    SciTech Connect

    Not Available

    1992-05-01

    This report is a compilation of studies done to develop an integrated set of strategies for the production of energy from renewable resources in Hawaii. Because of the close coordination between this program and other ongoing DOE research, the work will have broad-based applicability to the entire United States.

  3. School Information: Phase III of Quality Assessment Program. Appendix B.

    ERIC Educational Resources Information Center

    Burson, William W.

    This questionnaire, used in the Educational Quality Assessment Program in Pennsylvania, was designed to be filled out by school administrators. It requests information about staff size, enrollment size, library books available, hours of paraprofessionals, and quality of housing in school district. It also includes a checklist to show the extent of…

  4. Does the benefits schedule of cash assistance programs affect the purchase of temptation goods? Evidence from Peru.

    PubMed

    White, Justin S; Basu, Sanjay

    2016-03-01

    A critique of cash assistance programs is that beneficiaries may spend the money on "temptation goods" such as alcohol and tobacco. We exploit a change in the payment schedule of Peru's conditional cash transfer program to identify the impact of benefit receipt frequency on the purchase of temptation goods. We use annual household data among cross-sectional and panel samples to analyze the effect of the policy change on the share of the household budget devoted to four categories of temptation goods. Using a difference-in-differences estimation approach, we find that larger, less frequent payments increased the expenditure share of alcohol by 55-80% and sweets by 10-40%, although the absolute magnitudes of these effects are small. Our study suggests that less frequent benefits scheduling may lead cash recipients to make certain types of temptation purchases. PMID:26874596

  5. Flexible Scheduling.

    ERIC Educational Resources Information Center

    Davis, Harold S.; Bechard, Joseph E.

    A flexible schedule allows teachers to change group size, group composition, and class length according to the purpose of the lesson. This pamphlet presents various "master" schedules for flexible scheduling: (1) Simple block schedules, (2) back-to-back schedules, (3) interdisciplinary schedules, (4) school-wide block schedules, (5) open-lab…

  6. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  7. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  8. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  9. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  10. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  11. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  12. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  13. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  14. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  15. CHAP III- CHARRING ABLATOR PROGRAM FOR ADVANCED INVESTIGATION OF THERMAL PROTECTION SYSTEMS FOR ENTRY

    NASA Technical Reports Server (NTRS)

    Stroud, C. W.

    1994-01-01

    The transient response of a thermal protection material to heat applied to the surface can be calculated using the CHAP III computer program. CHAP III can be used to analyze pyrolysis gas chemical kinetics in detail and examine pyrolysis reactions-indepth. The analysis includes the deposition of solid products produced by chemical reactions in the gas phase. CHAP III uses a modelling technique which can approximate a wide range of ablation problems. The energy equation used in CHAP III incorporates pyrolysis (both solid and gas reactions), convection, conduction, storage, work, kinetic energy, and viscous dissipation. The chemically reacting components of the solid are allowed to vary as a function of position and time. CHAP III employs a finite difference method to approximate the energy equations. Input values include specific heat, thermal conductivity, thermocouple locations, enthalpy, heating rates, and a description of the chemical reactions expected. The output tabulates the temperature at locations throughout the ablator, gas flow within the solid, density of the solid, weight of pyrolysis gases, and rate of carbon deposition. A sample case is included, which analyzes an ablator material containing several pyrolysis reactions subjected to an environment typical of entry at lunar return velocity. CHAP III is written in FORTRAN IV for batch execution and has been implemented on a CDC CYBER 170 series computer operating under NOS with a central memory requirement of approximately 102K (octal) of 60 bit words. This program was developed in 1985.

  16. Revenues & Expenses, 2004-2009. NCAA[R] Division III Intercollegiate Athletics Programs Report

    ERIC Educational Resources Information Center

    Fulks, Daniel L., Comp.

    2010-01-01

    This report provides summary information concerning revenues and expenses of the National Collegiate Athletic Association (NCAA) Division III athletics programs for the fiscal years 2004 through 2009. It is the result of surveys conducted during the fall of each of those years. Although similar studies have been conducted for the NCAA since 1969,…

  17. Sequential Mathematics Course III. Volume One. Staff Development Program 1986-1987.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.

    The Sequential Mathematics Sequence provides students with an integrated course of study, including lessons which interweave algebra, geometry, logic, probability, and mathematical systems. This handbook is designed to meet the needs of teachers who will be teaching Course III in the sequence. The handbook, for use with staff development programs,…

  18. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Standard III-Program needs assessment. 36.12 Section 36.12 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION MINIMUM ACADEMIC STANDARDS FOR THE BASIC EDUCATION OF INDIAN CHILDREN AND NATIONAL CRITERIA FOR DORMITORY SITUATIONS...

  19. Integrating Expanded Core Sessions into the K-12 Program: A High School Scheduling Approach

    ERIC Educational Resources Information Center

    Lohmeier, Keri L.

    2007-01-01

    The author provides one perspective on how to integrate sessions of the expanded core curriculum for students who are visually impaired into a high school schedule to support an effective balance between (a) required hours for core academic courses and appropriate pacing of the courses for those students and (b) core courses and the expanded core…

  20. Content Analysis Schedule for Bilingual Education Programs: HABLA-Helping Advance Bilingual Learning in Abernathy.

    ERIC Educational Resources Information Center

    Hess, Richard T.; Shore, Marietta Saravia

    This content analysis schedule for HABLA-Helping Advance Bilingual Learning in Abernathy, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  1. Content Analysis Schedule for Bilingual Education Programs: Bilingual Education in a Consortium.

    ERIC Educational Resources Information Center

    Hess, Richard T.; Shore, Marietta Saravia

    This content analysis schedule for the City of Lakewood School District of Lakewood, New Jersey, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  2. 78 FR 74229 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, Clinical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ... FFS Fee-for-service FOBT Fecal occult blood test FQHC Federally qualified health center FR Federal... November 25, 1991 (56 FR 59502) set forth the first fee schedule used for payment for physicians' services... rule, published November 2, 1998 (63 FR 58814), effective for services furnished in CY 1999. Based...

  3. Content Analysis Schedule for Bilingual Education Programs: Compton Elementary Bilingual Education Plan.

    ERIC Educational Resources Information Center

    Hess, Richard T.; Shore, Marietta Saravia

    This content analysis schedule for the Compton Elementary Bilingual Education Plan of Compton, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and…

  4. Content Analysis Schedule for Bilingual Education Programs: Programa en Dos Lenguas.

    ERIC Educational Resources Information Center

    Ludanyi, R. P.; Shore, Marietta Saravia

    This content analysis schedule for the "Programa en Dos Lenguas" of Fort Worth, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  5. Space Shuttle 1976 into mainstream development - Program commitments on schedule to insure careful progress

    NASA Technical Reports Server (NTRS)

    Malkin, M. S.

    1976-01-01

    A progress report is given on various systems, noting conformity to schedule or changes in design. The Orbiter thermal protection system, the Space Shuttle main engine, the intertank for the structural test article (STA), thrust vector control systems, the Kennedy Space Center launch processing system, and Orbiters No. 1 and No. 2 are discussed.

  6. Content Analysis Schedule for Bilingual Education Programs: Adaptations of Bilingual Education.

    ERIC Educational Resources Information Center

    Hess, Richard T.

    This content analysis schedule for Adaptations of Bilingual Education of Orange, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  7. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    ERIC Educational Resources Information Center

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  8. 78 FR 65621 - Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction AGENCY... comment for an information collection entitled, ``Implementation of Title I/II Program...

  9. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  10. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  11. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  12. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  13. The National Heart, Lung, and Blood Institute Recipient Epidemiology and Donor Evaluation Study (REDS-III): A research program striving to improve blood donor and transfusion recipient outcomes

    PubMed Central

    Kleinman, Steven; Busch, Michael P; Murphy, Edward L; Shan, Hua; Ness, Paul; Glynn, Simone A.

    2014-01-01

    Background The Recipient Epidemiology and Donor Evaluation Study -III (REDS-III) is a 7-year multicenter transfusion safety research initiative launched in 2011 by the National Heart, Lung, and Blood Institute. Study design The domestic component involves 4 blood centers, 12 hospitals, a data coordinating center, and a central laboratory. The international component consists of distinct programs in Brazil, China, and South Africa which involve US and in-country investigators. Results REDS-III is using two major methods to address key research priorities in blood banking/transfusion medicine. First, there will be numerous analyses of large “core” databases; the international programs have each constructed a donor/donation database while the domestic program has established a detailed research database that links data from blood donors and their donations, the components made from these donations, and data extracts from the electronic medical records of the recipients of these components. Secondly, there are more than 25 focused research protocols involving transfusion recipients, blood donors, or both that are either in progress or scheduled to begin within the next 3 years. Areas of study include transfusion epidemiology and blood utilization; transfusion outcomes; non-infectious transfusion risks; HIV-related safety issues (particularly in the international programs); emerging infectious agents; blood component quality; donor health and safety; and other donor issues. Conclusions It is intended that REDS-III serve as an impetus for more widespread recipient and linked donor-recipient research in the US as well as to help assure a safe and available blood supply in the US and in international locations. PMID:24188564

  14. NCSMEMO, an IBM PC program using dBASE III to cross-reference letters

    SciTech Connect

    Klave, D.L.; Rogers, C.A.

    1985-08-01

    NCSMEMO is a database management system consisting of six command files written in Ashton-Tate's dBASE III programming language. NCSMEMO provides a method of cross-referencing Nuclear Criticality Safety Memoranda to facilitate locating information based on keywords and provides an abstract of each memo. The primary benefit of NCSMEMO is its ability to quickly search through abstracts of over 470 memos and locate those which apply to specific keywords. NCSMEMO is menu driven for ease of use.

  15. Priorities and allocations support for energy: keeping energy programs on schedule

    SciTech Connect

    Not Available

    1985-08-01

    This publication has covered DOE and DOC procedures related to an application for rating authority for an energy program, the DPAS (Defense Priorities and Allocations System) and the Special Priorities Assistance Program's relation to priorities and allocations for energy programs. A person engaged in an eligible energy program or project must be familiar with DPAS rules, regulations and procedures. There are important benefits to be gained by the Government and the energy industry through the proper use of the priorities and allocations system.

  16. Residential Programming for Mentally Retarded Persons. Volume III, Developmental Programming in the Residential Facility.

    ERIC Educational Resources Information Center

    National Association for Retarded Children, Arlington, TX. South Central Regional Office.

    The third of four booklets on residential programing for the mentally retarded is intended to help parents evaluate residential services and participate in decisions about program design and implementation. Areas of appropriate program emphasis are indicated for different age groups and for the various degrees of mental retardation from profound…

  17. Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

    NASA Technical Reports Server (NTRS)

    Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun

    2012-01-01

    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

  18. G-III Precision Autopilot Development in Support of UAVSAR Program

    NASA Technical Reports Server (NTRS)

    Lee, James

    2007-01-01

    The primary objective of the UAVSAR Project is to develop a miniaturized polarimetric L-band synthetic aperture radar (SAR) for use on an unmanned aerial vehicle (UAV) or minimally piloted vehicle. This viewgraph presentation reviews NASA Dryden's role in the UAVSAR program. The G-III aircraft is described and shown, as well as a high level system architecture. The goals of the Platform Precision Autopilot (PPA) that it are shall fly the G-III within a 10 m (32.8 ft) diameter tube for at least 90% of each data take in conditions of calm to light atmospheric disturbances, as defined in MIL-STD-1797. That it minimize motion during data collection. It is critical to operate the UAVSAR System on a steady platform.

  19. Epstein-Barr virus growth/latency III program alters cellular microRNA expression

    SciTech Connect

    Cameron, Jennifer E. Fewell, Claire Yin, Qinyan McBride, Jane Wang Xia Lin Zhen

    2008-12-20

    The Epstein-Barr virus (EBV) is associated with lymphoid and epithelial cancers. Initial EBV infection alters lymphocyte gene expression, inducing cellular proliferation and differentiation as the virus transitions through consecutive latency transcription programs. Cellular microRNAs (miRNAs) are important regulators of signaling pathways and are implicated in carcinogenesis. The extent to which EBV exploits cellular miRNAs is unknown. Using micro-array analysis and quantitative PCR, we demonstrate differential expression of cellular miRNAs in type III versus type I EBV latency including elevated expression of miR-21, miR-23a, miR-24, miR-27a, miR-34a, miR-146a and b, and miR-155. In contrast, miR-28 expression was found to be lower in type III latency. The EBV-mediated regulation of cellular miRNAs may contribute to EBV signaling and associated cancers.

  20. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  1. Alternatives in Scheduling Patterns: Practitioner Implementation of Minicourse Programs in Selected Midwestern High Schools.

    ERIC Educational Resources Information Center

    Hansen, Patricia; Guenther, John

    The purposes of the document are to report on the status of social studies minicourse programs in selected midwestern high schools and to provide information to schools regarding obstacles to minicourses as alternatives to traditional programs. A 1976-77 survey of 265 midwestern high schools determined that only 60 (23%) of the schools offered…

  2. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  3. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  4. ESEA, Title III Dissemination Program Evaluation Report, 1972-73, 1973-74. Sections I and II.

    ERIC Educational Resources Information Center

    Soper, Dorothy B.

    This report evaluates the New Jersey ESEA Title III dissemination program during its first two years, 1972-74. Purposes of the program are to (a) determine if essential elements of successful education programs can be transferred from originating districts to adopter districts while yielding comparable student gains, and (b) provide educators with…

  5. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board...

  6. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  7. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  8. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  9. Phase I/II Study Evaluating Early Tolerance in Breast Cancer Patients Undergoing Accelerated Partial Breast Irradiation Treated With the MammoSite Balloon Breast Brachytherapy Catheter Using a 2-Day Dose Schedule

    SciTech Connect

    Wallace, Michelle; Martinez, Alvaro; Mitchell, Christina; Chen, Peter Y.; Ghilezan, Mihai; Benitez, Pamela; Brown, Eric; Vicini, Frank

    2010-06-01

    Purpose: Initial Phase I/II results using balloon brachytherapy to deliver accelerated partial breast irradiation (APBI) in 2 days in patients with early-stage breast cancer are presented. Materials and Methods: Between March 2004 and August 2007, 45 patients received adjuvant radiation therapy after lumpectomy with balloon brachytherapy in a Phase I/II trial delivering 2800 cGy in four fractions of 700 cGy. Toxicities were evaluated using the National Cancer Institute Common Toxicity Criteria for Adverse Events v3.0 scale and cosmesis was documented at >=6 months. Results: The median age was 66 years (range, 48-83) and median skin spacing was 12 mm (range, 8-24). The median follow-up was 11.4 months (5.4-48 months) with 21 patients (47%) followed >=1 year, 11 (24%) >=2 years, and 7 (16%) >=3 years. At <6 months (n = 45), Grade II toxicity rates were 9% radiation dermatitis, 13% breast pain, 2% edema, and 2% hyperpigmentation. Grade III breast pain was reported in 13% (n = 6). At >=6 months (n = 43), Grade II toxicity rates were: 2% radiation dermatitis, 2% induration, and 2% hypopigmentation. Grade III breast pain was reported in 2%. Infection was 13% (n = 6) at <6 months and 5% (n = 2) at >=6 months. Persistent seroma >=6 months was 30% (n = 13). Fat necrosis developed in 4 cases (2 symptomatic). Rib fractures were seen in 4% (n = 2). Cosmesis was good/excellent in 96% of cases. Conclusions: Treatment with balloon brachytherapy using a 2-day dose schedule resulted acceptable rates of Grade II/III chronic toxicity rates and similar cosmetic results observed with a standard 5-day accelerated partial breast irradiation schedule.

  10. The scheduled squeeze on children's programs: tracking the implications of projected federal spending patterns.

    PubMed

    Steuerle, C Eugene; Isaacs, Julia B

    2014-12-01

    Federal programs for children are under increasing budgetary pressure. According to current federal law or any budget alternative being offered by the president or congressional leaders, spending on children would decline as a share of the budget and of the national economy. This article summarizes past, current, and projected budgets for children's programs. It traces significant historical expansions of means-tested programs, such as the Supplemental Nutrition Assistance Program; depicts fairly significant declines in more universal supports, such as the income tax exemption for dependents; and shows the future squeeze on children's programs brought about by automatic growth in health, retirement, and tax subsidy programs, along with the failure of revenues to keep pace with the overall growth in spending. Federal programs for health care have been a mixed blessing for children: Medicaid has grown to be the largest federal support for children, but overall federal health care costs eat away at the share of the budgetary pie left for anything else. PMID:25489041

  11. An Approximation Solution to Refinery Crude Oil Scheduling Problem with Demand Uncertainty Using Joint Constrained Programming

    PubMed Central

    Duan, Qianqian; Yang, Genke; Xu, Guanglin; Pan, Changchun

    2014-01-01

    This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can be more practical for optimizing crude oil operations. Using joint chance constraints, the demand uncertainty is treated by specifying proximity level on the satisfaction of product demands. However, the joint chance constraints usually hold strong nonlinearity and consequently, it is still hard to handle it directly. In this paper, an approximation method combines a relax-and-tight technique to approximately transform the joint chance constraints to a serial of parameterized linear constraints so that the complicated problem can be attacked iteratively. The basic idea behind this approach is to approximate, as much as possible, nonlinear constraints by a lot of easily handled linear constraints which will lead to a well balance between the problem complexity and tractability. Case studies are conducted to demonstrate the proposed methods. Results show that the operation cost can be reduced effectively compared with the case without considering the demand correlation. PMID:24757433

  12. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL... programs: A1 Aircraft Department of Defense. 1 A2 Missiles Do. A3 Ships Do. A4 Tank—Automotive Do....

  13. Design and Evaluation of the User-Adapted Program Scheduling system based on Bayesian Network and Constraint Satisfaction

    NASA Astrophysics Data System (ADS)

    Iwasaki, Hirotoshi; Sega, Shinichiro; Hiraishi, Hironori; Mizoguchi, Fumio

    In recent years, lots of music content can be stored in mobile computing devices, such as a portable digital music player and a car navigation system. Moreover, various information content like news or traffic information can be acquired always anywhere by a cellular communication and a wireless LAN. However, usability issues arise from the simple interfaces of mobile computing devices. Moreover, retrieving and selecting such content poses safety issues, especially while driving. Thus, it is important for the mobile system to recommend content automatically adapted to user's preference and situation. In this paper, we present the user-adapted program scheduling that generates sequences of content (Program) suiting user's preference and situation based on the Bayesian network and the Constraint Satisfaction Problem (CSP) technique. We also describe the design and evaluation of its realization system, the Personal Program Producer (P3). First, preference such as a genre ratio of content in a program is learned as a Bayesian network model using simple operations such as a skip behavior. A model including each content tends to become large-scale. In order to make it small, we present the model separation method that carries out losslessly compression of the model. Using the model, probabilistic distributions of preference to generate constraints are inferred. Finally satisfying the constraints, a program is produced. This kind of CSP has an issue of which the number of variables is not fixedness. In order to make it variable, we propose a method using metavariables. To evaluate the above methods, we applied them to P3 on a car navigation system. User evaluations helped us clarify that the P3 can produce the program that a user prefers and adapt it to the user.

  14. Regional Office Procedures. Stage I Final Report for the Study of Program Management Procedures in the Campus-Based and Basic Grant Programs. (Volume III).

    ERIC Educational Resources Information Center

    Puma, Michael J.

    Volume III of a study of program management procedures in the campus-based and Basic Educational Opportunity Grant (BEOG) programs provides a description of procedures employed within the U.S. Office of Education regional offices to administer the Basic Grant and campus-based student financial assistance programs. The objective of the report is to…

  15. Program for the Improvement of Downhole Drilling-Motor Bearings and Seals. Phase III, Part 2: final report

    SciTech Connect

    Not Available

    1980-03-01

    Six months of activity to improve downhole drilling-motor bearings and seals for geothermal applications are reported. The following are covered: seal testing and evaluation, bearing-seal package testing and evaluation, lubricant testing and evaluation, and program status, plans and schedule. (MHR)

  16. Graduate Program Scheduling Gains Flexibility through Container Courses: A Case Study

    ERIC Educational Resources Information Center

    Rose, Richard

    2011-01-01

    Online course delivery makes possible one innovation which can provide each student with greater program flexibility as well as some personal ownership of the direction and pace of his degree progress. This concept can be called the "container course." A container course is the offering of more than one course simultaneously under a single course…

  17. Medicare program; payment policies under the physician fee schedule, five-year review of work relative value units, clinical laboratory fee schedule: signature on requisition, and other revisions to part B for CY 2012. Final rule with comment period.

    PubMed

    2011-11-28

    This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues. PMID:22145186

  18. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  19. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  20. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  1. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  2. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the materials that are incorporated by reference... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... administered by the Railroad Commission of Texas. A program revision application for Class III brine...

  3. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  4. Comparison between different off-season resistance training programs in Division III American college football players.

    PubMed

    Hoffman, Jay R; Ratamess, Nicholas A; Klatt, Marc; Faigenbaum, Avery D; Ross, Ryan E; Tranchina, Nicholas M; McCurley, Robert C; Kang, Jie; Kraemer, William J

    2009-01-01

    The purpose of this study was to examine the efficacy of periodization and to compare different periodization models in resistance trained American football players. Fifty-one experienced resistance trained American football players of an NCAA Division III football team (after 10 weeks of active rest) were randomly assigned to 1 of 3 groups that differed only in the manipulation of the intensity and volume of training during a 15-week offseason resistance training program. Group 1 participated in a nonperiodized (NP) training program, group 2 participated in a traditional periodized linear (PL) training program, and group 3 participated in a planned nonlinear periodized (PNL) training program. Strength and power testing occurred before training (PRE), after 7 weeks of training (MID), and at the end of the training program (POST). Significant increases in maximal (1-repetition maximum [1RM]) squat, 1RM bench press, and vertical jump were observed from PRE to MID for all groups; these increases were still significantly greater at POST; however, no MID to POST changes were seen. Significant PRE to POST improvements in the medicine ball throw (MBT) were seen for PL group only. The results do not provide a clear indication as to the most effective training program for strength and power enhancements in already trained football players. Interestingly, recovery of training-related performances was achieved after only 7 weeks of training, yet further gains were not observed. These data indicate that longer periods of training may be needed after a long-term active recovery period and that active recovery may need to be dramatically shortened to better optimize strength and power in previously trained football players. PMID:19130636

  5. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  6. 75 FR 26349 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... Physician Fee Schedule and Other Revisions to Part B for CY 2010; Final Rule'' (74 FR 61738), as well as... Physician Fee Schedule and Other Revisions to Part B for CY 2010; Corrections'' (74 FR 65449). DATES...: Rebecca Cole, (410) 786-4497. SUPPLEMENTARY INFORMATION: I. Background In FR Doc. E9-26502 of November...

  7. Mapping of Primary Instructional Methods and Teaching Techniques for Regularly Scheduled, Formal Teaching Sessions in an Anesthesia Residency Program.

    PubMed

    Vested Madsen, Matias; Macario, Alex; Yamamoto, Satoshi; Tanaka, Pedro

    2016-06-01

    In this study, we examined the regularly scheduled, formal teaching sessions in a single anesthesiology residency program to (1) map the most common primary instructional methods, (2) map the use of 10 known teaching techniques, and (3) assess if residents scored sessions that incorporated active learning as higher quality than sessions with little or no verbal interaction between teacher and learner. A modified Delphi process was used to identify useful teaching techniques. A representative sample of each of the formal teaching session types was mapped, and residents anonymously completed a 5-question written survey rating the session. The most common primary instructional methods were computer slides-based classroom lectures (66%), workshops (15%), simulations (5%), and journal club (5%). The number of teaching techniques used per formal teaching session averaged 5.31 (SD, 1.92; median, 5; range, 0-9). Clinical applicability (85%) and attention grabbers (85%) were the 2 most common teaching techniques. Thirty-eight percent of the sessions defined learning objectives, and one-third of sessions engaged in active learning. The overall survey response rate equaled 42%, and passive sessions had a mean score of 8.44 (range, 5-10; median, 9; SD, 1.2) compared with a mean score of 8.63 (range, 5-10; median, 9; SD, 1.1) for active sessions (P = 0.63). Slides-based classroom lectures were the most common instructional method, and faculty used an average of 5 known teaching techniques per formal teaching session. The overall education scores of the sessions as rated by the residents were high. PMID:27243580

  8. A Sequenced Instructional Program in Physical Education for the Handicapped, Phase III. Producing and Disseminating Demonstration Packages. Final Report.

    ERIC Educational Resources Information Center

    Carr, Dorothy B.; Avance, Lyonel D.

    Presented is a sequenced instructional program in physical education which constitutes the third of a three-phase, 4-year project, funded by Title III, for handicapped children, preschool through high school levels, in the Los Angeles Unified School District. Described are the project setting and the following accomplishments: a curriculum guide…

  9. Committee of the Undergraduate Program in Mathematics Geometry Conference, Part III: Geometric Transformation Groups and Other Topics.

    ERIC Educational Resources Information Center

    Durst, Lincoln K., Ed.

    This is Part III of the first volume of the proceedings of the Committee on the Undergraduate Program in Mathematics (CUPM) Geometry Conference, held at Santa Barbara in June, 1967. The purpose of the conference was to consider the status of geometry in colleges at the undergraduate level. The conference, attended by undergraduate mathematics…

  10. Scheduling game

    SciTech Connect

    Kleck, W

    1982-04-01

    Structuring a schedule - whether by Critical Path Method (CPM) or Precedence Charting System (PCS) - involves estimating the duration of one or more activities and arranging them in the most logical sequence. Given the start date, the completion date is relatively simple to determine. What is then so complicated about the process. It is complicated by the people involved - the people who make the schedules and the people who attempt to follow them. Schedules are an essential part of project management and construction contract administration. Much of the material available pertains to the mechanics of schedules, the types of logic networks, the ways that data can be generated and presented. This paper sheds light on other facets of the subject - the statistical and philosophical fundamentals involved in scheduling.

  11. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and...

  12. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and...

  13. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and...

  14. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and...

  15. Introduction of sequential inactivated polio vaccine-oral polio vaccine schedule for routine infant immunization in Brazil's National Immunization Program.

    PubMed

    Domingues, Carla Magda Allan S; de Fátima Pereira, Sirlene; Cunha Marreiros, Ana Carolina; Menezes, Nair; Flannery, Brendan

    2014-11-01

    In August 2012, the Brazilian Ministry of Health introduced inactivated polio vaccine (IPV) as part of sequential polio vaccination schedule for all infants beginning their primary vaccination series. The revised childhood immunization schedule included 2 doses of IPV at 2 and 4 months of age followed by 2 doses of oral polio vaccine (OPV) at 6 and 15 months of age. One annual national polio immunization day was maintained to provide OPV to all children aged 6 to 59 months. The decision to introduce IPV was based on preventing rare cases of vaccine-associated paralytic polio, financially sustaining IPV introduction, ensuring equitable access to IPV, and preparing for future OPV cessation following global eradication. Introducing IPV during a national multivaccination campaign led to rapid uptake, despite challenges with local vaccine supply due to high wastage rates. Continuous monitoring is required to achieve high coverage with the sequential polio vaccine schedule. PMID:25316829

  16. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  17. 76 FR 42771 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...--Federally Qualified Health Center FR--Federal Register FTE--full time equivalent GAF--Geographic adjustment... rule, published on November 25, 1991 (56 FR 59502), set forth the fee schedule for payment for... service in a final rule, published November 2, 1998 (63 FR 58814), effective for services furnished...

  18. 75 FR 40039 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... renal disease FAX Facsimile FDA Food and Drug Administration (HHS) FFS Fee-for-service FR Federal... rule, published on November 25, 1991 (56 FR 59502), set forth the fee schedule for payment for...' service in a final rule, published November 2, 1998 (63 FR 58814), effective for services furnished...

  19. 77 FR 68891 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... prescribing FFS Fee-for-service FR Federal Register GAF Geographic adjustment factor GAO Government... comment period (76 FR 72452). Several types of providers are projected to see decreases in Medicare PFS... on November 25, 1991 (56 FR 59502) set forth the fee schedule for payment for physicians'...

  20. 76 FR 73025 - Medicare Program; Payment Policies Under the Physician Fee Schedule, Five-Year Review of Work...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as......

  1. Creating a Complex Schedule with "REFLEX."

    ERIC Educational Resources Information Center

    Kren, George M.; Christakes, George

    1991-01-01

    Discusses "REFLEX," a software package for scheduling. Explores the program's applications in preparing a departmental class schedule. Explains that "REFLEX" includes a filter function and some attributes of a spreadsheet but lacks the ability to interact with other databases. Concludes that the program can make scheduling easier and more…

  2. A DSN optimal spacecraft scheduling model

    NASA Technical Reports Server (NTRS)

    Webb, W. A.

    1982-01-01

    A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's Method and a heuristic starting algorithm.

  3. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  4. 77 FR 44721 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ...This major proposed rule addresses changes to the physician fee schedule, payments for Part B drugs, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It would also implement provisions of the Affordable Care Act by establishing a face-to-face encounter as a condition of payment......

  5. 76 FR 1669 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ...) * (17) * (17) * (17) * (17) * (17) * (17) (19) Ind. Alloc. (1st part) Step 8 See (18) 0.65 5.27 0.58 0.58 0.00 0.25 0.25 0.00 (20) Ind. Alloc. Formulas (2nd part)..... Step 8 See Step 8 (15) (15) (15)+(11... Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2011; Final Rule'' (75...

  6. NIF Title III engineering plan

    SciTech Connect

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  7. The capillary pumped loop III (CAPL III) flight demonstration description and status

    NASA Astrophysics Data System (ADS)

    Kim, Jeong (Jake) H.; Cheung, Kwok-Hung; Butler, Dan; Ku, Jentung; Haught, Eric; Kroliczeck, Edward J.; Cullimore, Brent; Baumann, Jane

    1997-01-01

    To realize the full benefits of capillary pump loop (CPL) devices, for use in spacecraft thermal control subsystems, a reliable, load sharing, multiple evaporator system must be developed and successfully demonstrated in space. The Capillary Pumped Loop Flight Experiment 3 (CAPL III) will be the second attempt to flight demonstrate a multiple evaporator CPL in space environment. Using the lessons learned from CAPL I, which was flown aboard STS-60 in February 1994, new hardware and concepts are being developed for CAPL III to enable load sharing between evaporators, reliable system start-up/re-start, and reliable continuous operation. Started in May 1996, CAPL III is primarily a joint venture between the Naval Research Laboratory and the NASA-Goddard Space Flight Center, with Swales and Associates, Inc. as an industry partner. The program is scheduled to meet an STS flight opportunity in mid-1998. This paper will present the requirements and the preliminary design description of the CAPL III CPL system.

  8. Program for Assisting the Replacement of Industrial Solvents PARIS III User’s Guide

    EPA Science Inventory

    PARIS III is a third generation Windows-based computer software to assist the design of less harmful solvent replacements by estimating values of the solvent properties that characterize the static, dynamic, performance, and environmental behavior of the original solvent mixture ...

  9. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  10. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands. 147.2101 Section 147.2101 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS...

  11. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  12. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-03-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processors. User program and their gangs of processors are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantums are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory. 2 refs., 1 fig.

  13. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  14. What Do Schools Want? Assessing Elementary School Administrator and Teacher Preferences Related to Nutrition Education Program Scheduling

    ERIC Educational Resources Information Center

    Hermann, Janice; Parker, Stephany; Phelps, Josh; Brown, Barbara

    2011-01-01

    Extension is positioned to provide school-based nutrition education programs as required by the 2004 Child Nutrition and WIC Reauthorization Act. To enhance program acceptance and sustainability, it is important to consider school administrators' and teachers' interests and preferences regarding nutrition education programming. The project…

  15. 40 CFR 52.2625 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.2625 Section 52.2625 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wyoming § 52.2625 Compliance schedules. (a) The compliance schedules for the...

  16. Enhanced Memetic Algorithm for Task Scheduling

    NASA Astrophysics Data System (ADS)

    Padmavathi, S.; Shalinie, S. Mercy; Someshwar, B. C.; Sasikumar, T.

    Scheduling tasks onto the processors of a parallel system is a crucial part of program parallelization. Due to the NP-hardness of the task scheduling problem, scheduling algorithms are based on heuristics that try to produce good rather than optimal schedules. This paper proposes a Memetic algorithm with Tabu search and Simulated Annealing as local search for solving Task scheduling problem considering communication contention. This problem consists of finding a schedule for a general task graph to be executed on a cluster of workstations and hence the schedule length can be minimized. Our approach combines local search (by self experience) and global search (by neighboring experience) possessing high search efficiency. The proposed approach is compared with existing list scheduling heuristics. The numerical results clearly indicate that our proposed approach produces solutions which are closer to optimality and/or better quality than the existing list scheduling heuristics.

  17. ASTER Scheduling Prioritization Function

    NASA Technical Reports Server (NTRS)

    Cohen, Ron

    1996-01-01

    ASTER schedules are generated by an automated scheduling system. This scheduler will generate psuedo-optimal schedules based on a priority scheme. This priority scheme is controlled by the Science Team.

  18. Pilot Educational Program for Mentally Disordered Minors 1972-1973: End of the Budget Period Report; E. S. E. A. Title III.

    ERIC Educational Resources Information Center

    Santa Cruz County Superintendent of Schools, CA.

    The report describes a 3-year, ongoing pilot project designed to devise a remedial educational program for 10 autistic elementary school children (5- to 12-years-old) that would prepare some students for subsequent entry into regular or special education public school classes. Described is a typical daily schedule emphasizing individual…

  19. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  20. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  1. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in the Finding Aids... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  2. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical, position, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  3. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical, position, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation: (1) Those compounds, mixtures,...

  4. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  5. Systematic Instruction for Retarded Children: The Illinois Program. Part III: Self-Help Instruction.

    ERIC Educational Resources Information Center

    Linford, Maxine D.; And Others

    The manual for programed instruction of self care skills for trainable mentally handicapped children consists of dressing, dining, grooming, and toilet training. Teaching methods used include behavioral analysis and management, task analysis, and errorless learning. The lesson plans in each section are programed to maximize the child's success at…

  6. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2008-10

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2013

    2013-01-01

    This is the fourth biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information reported by states to the U.S. Department of Education regarding services…

  7. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2006-08

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2012

    2012-01-01

    This is the third biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information regarding the U.S. Department of Education's efforts to hold states accountable…

  8. THE STANDARD CALIBRATION INSTRUMENT AUTOMATION SYSTEM FOR THE ATOMIC ABSORPTION SPECTROPHOTOMETER. PART III: PROGRAM DOCUMENTATION

    EPA Science Inventory

    This report contains complete documentation for the 15 programs and 11 data files of the EPA Atomic Absorption Instrument Automation System. The system incorporates the following major features: (1) multipoint calibration using first, second, or third degree regression or linear ...

  9. WHO'S WHO III IN THE INTERAGENCY ENERGY/ENVIRONMENT R AND D PROGRAM

    EPA Science Inventory

    This directory provides a means of access to information on specific projects currently underway within the Interagency Program. The 14 major categories covered are: Characterization, measurement, and monitoring, Environmental transport processes, Health effects, Ecological effec...

  10. ORTEP-III: Oak Ridge Thermal Ellipsoid Plot Program for crystal structure illustrations

    SciTech Connect

    Burnett, M.N.; Johnson, C.K.

    1996-07-01

    This report describes a computer program for drawing crystal structure illustrations. Ball-and-stick type illustrations of a quality suitable for publication are produced with either spheres or thermal-motion probability ellipsoids on the atomic sites. The program can also produce stereoscopic pairs of illustrations which aid in the visualization of complex packing arrangements of atoms and thermal motion patterns. Interatomic distances, bond angles, and principal axes of thermal motion are also calculated to aid the structural study.

  11. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  12. Project SOUL: Computer Training Program for High School Students from Disadvantaged Areas. Part III, The Scientific Programming Course. Technical Report.

    ERIC Educational Resources Information Center

    Lew, Art

    This report details the Scientific Programming Course that is a part of "Project SOUL." The course is intended for underprivileged high school juniors and seniors having an interest in mathematics or science and aspirations to attend college. The report is divided into three sections. In section I, the administration and operation of the course as…

  13. Model Early Childhood Learning Program, Baltimore, Maryland. Model Programs, Title III--Elementary and Secondary Education Act.

    ERIC Educational Resources Information Center

    National Center for Educational Communication (DHEW/NIE), Washington, DC.

    The purpose of the Model Early Childhood Learning Program of Baltimore, Md., City Schools is to provide experiences for disadvantaged children which will constitute the prerequisite developmental history needed to undertake first grade concepts and skills. The project's stated objectives are: (1) to improve the measured aptitude or readiness for…

  14. A Study of Career Development, Learning Motivation, and Learning Satisfaction of Adult Learners in Unconventional Scheduling Graduate Programs

    ERIC Educational Resources Information Center

    Chu, Hui-Chin; Hsieh, Mei-Chi; Chang, Shan-Chih

    2007-01-01

    The study aimed at investigating the relationships among career development, learning motivation, and learning satisfaction of adult learners in master's programs at S University. Questionnaires were distributed with 211 valid returns (71%). The results indicated that some of the demographics are factors affecting both of the learners' learning…

  15. 77 FR 227 - Medicare Program; Payment Policies Under the Physician Fee Schedule, Five-Year Review of Work...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-04

    ... physician payment not previously identified. SUPPLEMENTARY INFORMATION: I. Background In FR Doc. 2011-28597 of November 28, 2011 (76 FR 73026), the final rule with comment period entitled ``Medicare Program.... Correction of Errors 0 In FR Doc. 2011-28597 of November 28, 2011 (76 FR 73026), the final rule with...

  16. 75 FR 73169 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... for Mileage 3. Analysis of and Responses to Public Comments a. Basis for Reconsideration of the... Quality Reporting System Measures (3) Summary of Comments and Responses i. The Final 2011 Physician... Initiative (PQRI) 3. Electronic Prescribing (eRx) Incentive Program X. Response to Comments XI....

  17. Arapahoe High School Variable Student Scheduling.

    ERIC Educational Resources Information Center

    Arapahoe County School District 6, Littleton, CO.

    This document describes the variable student scheduling program at Arapahoe High School in Littleton, a suburb of Denver, Colorado. Under this plan students have Monday-Wednesday-Friday classes and Tuesday-Thursday classes of approximately one hour. Four- and five-day-a-week classes are also scheduled. The program is now in its third year of…

  18. Evolutionary Scheduler for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  19. Habilitation of the Severely and Profoundly Retarded: Volume III. Reports from the Specialized Training Program.

    ERIC Educational Resources Information Center

    Horner, Robert H., Ed.; Bellamy, G. Thomas, Ed.

    Sixteen papers concerned with vocational habilitation of the severely and profoundly retarded are organized into three parts: issues in habilitation, stimulus control of vocational behavior, and instrumentation for program evaluation. Papers have the following titles and authors: "Structured Employment: Productivity and Productive Capacity" (R.…

  20. The Survey of College Marketing Programs. Volume III: Electronic Advertising and Marketing.

    ERIC Educational Resources Information Center

    Primary Research Group, Inc., New York, NY.

    This report presents 203 tables detailing findings concerning the use of electronic advertising within marketing programs at 68 colleges and universities. Highlights of this report include: colleges in the sample enroll a mean of 5,450 students; 5.6 percent of the colleges produce a CD-ROM version of the viewbook; 39.7 percent enable applicants to…

  1. Core III Materials for Rural Agriculture Programs. Units A-G.

    ERIC Educational Resources Information Center

    Courson, Roger L.; And Others

    This curriculum guide includes teaching packets for 12 areas of study to be included in a core curriculum for 11th-grade or third-year students enrolled in rural agricultural programs in Illinois. Each problem area includes some or all of the following components: suggestions to the teacher, teacher guide, competency inventory, information sheet,…

  2. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  3. Core III Materials for Metropolitan Agriculture/Horticulture Programs. Units A-I.

    ERIC Educational Resources Information Center

    Biondo, Ron; And Others

    This first volume of a two-volume curriculum guide contains 11 problem areas selected for study to be included in a core curriculum for 11th-grade or third-year students enrolled in a metropolitan agricultural program. The 11 problem areas are divided into eight units: Orientation to Agricultural Occupations (Gaining Employment), Supervised…

  4. Dance-based exercise program in rheumatoid arthritis. Feasibility in individuals with American College of Rheumatology functional class III disease.

    PubMed

    Noreau, L; Moffet, H; Drolet, M; Parent, E

    1997-01-01

    Many studies have demonstrated that aerobic exercise training is beneficial to prevent physical deconditioning in persons with rheumatoid arthritis (RA) without inducing adverse effects on individual's joints and general health. After significant results in individuals with RA (Functional Class I and II), the present study was conducted to demonstrate the feasibility of a modified dance-based exercise program to improve the physical fitness and psychological state of persons with RA (Class III). Ten (10) female subjects (mean age, 54 +/- 10 years) participated in an eight-week exercise program (twice weekly). Health status, use of medication, joint pain and swelling, cardiorespiratory fitness, activity of daily living, and psychological state were assessed before and after the training program. A high level of participation has been maintained by the participants (mean = 14.8/16 sessions). Most of them were able to perform a maximal exercise test on treadmill and reached 90% of the predicted heart rate at maximal exercise. No significant gain in aerobic power was observed for the group as a whole, but four subjects showed improvements of between 10% and 20% of their cardiorespiratory fitness. Positive changes in depression, anxiety, fatigue, and tension were observed after the eight-week exercise program. No deleterious effect on the health status was observed. These findings provide some evidences as to the feasibility of submitting individuals with RA to a modified dance-exercise program. Further studies, however, are required to determine the long-term effect of weight-bearing exercise on the health status of individuals with RA. PMID:9129516

  5. 29 CFR 1952.211 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual... occupational health program, July, 1975; (m) Fully implemented public employees program, December, 1975;...

  6. Energy Economic Data Base (EEDB) Program. Phase III. Final report and third update

    SciTech Connect

    Crowley, J. H.; Allen, R. E.; Aklu, G. L.; Benedict, R. G.; Brown, P. E.; Hodson, J. S.; Kaminski, R. S.; Lee, N. H.; Marda, R. S.; Martin, R. J.; Molin, A. T.; Smith, M. H.; Sosnowicz, E. J.; Valorie, C. M.; Woodhull, A. S.; Ziegler, E. J.

    1981-07-01

    The objective of the USDOE EEDB Program is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information of significance to the US Department of Energy. This information is intended to be used by USDOE in evauating and monitoring US civilian nuclear power programs, and to provide them with a consistent means of evaluating the nuclear option and proposed alternatives. The data tables, which make up the bulk of the report, are updated to January 1, 1980. The data in these tables and in the backup data file supercede the information presented in the Second Update (1979). Where required, new descriptive information is added in the text to supplement the data tables.

  7. Users Speak Out: A Look at Six Administrative Software Programs.

    ERIC Educational Resources Information Center

    Bruder, Isabelle

    1988-01-01

    Reviews six microcomputer-based administrative software programs that handle scheduling, grade reporting, and attendance tasks: (1) Alpha II, (2) Harts III, (3) Mount Castor, (4) The Osiris System, (5) The School System, and (6) STARS (Student Academic Records System). Companies producing the programs, systems they run on, and price information…

  8. The Oral History Program: III. Personal views of health sciences librarianship and the Medical Library Association.

    PubMed Central

    McKenzie, D; Pifalo, V

    1998-01-01

    The Medical Library Association Oral History Program uses accepted oral history techniques to collect and preserve interviews with members. The original taped interviews and transcripts are kept in the Medical Library Association archives and made available for research purposes; edited copies of the interviews are distributed through the National Network of Libraries of Medicine, and members are encouraged to borrow and read the histories. Summaries of forty-three interviews provide personal views on health sciences librarianship and the Medical Library Association. PMID:9803287

  9. Safety with Ocrelizumab in Rheumatoid Arthritis: Results from the Ocrelizumab Phase III Program

    PubMed Central

    Emery, Paul; Rigby, William; Tak, Paul P.; Dörner, Thomas; Olech, Ewa; Martin, Carmen; Millar, Laurie; Travers, Helen; Fisheleva, Elena

    2014-01-01

    Objective The objective was to determine the safety of ocrelizumab (OCR) in patients with rheumatoid arthritis (RA). Methods This was an analysis of the double-blind, placebo-controlled periods and long-term follow-up of 4 OCR phase III trials in RA (SCRIPT, STAGE, FILM and FEATURE). Safety data per study and the results of a meta-analysis of serious infectious events (SIEs) are presented. Results Overall, 868 patients received placebo, 1064 patients OCR 200 mg×2 (or 400 mg×1) (OCR200), and 827 patients OCR 500 mg×2 (OCR500) plus background methotrexate (MTX) at baseline and 24 weeks. During the double-blind, placebo-controlled periods, the incidence of adverse events and serious adverse events was comparable between the OCR+MTX and placebo +MTX groups. Infusion-related reactions were more common with OCR+MTX and decreased in frequency with subsequent infusions. Serious infusion-related reactions were rare (0.1%). Serious infections occurred more frequently with OCR500+MTX. In the meta-analysis, a statistically significant difference from placebo +MTX in incidence of SIEs per 100 patient-years of 2.4 (95% CI, 0.3–4.5) was observed with OCR500+MTX, but not with OCR200+MTX (0.6; 95% CI, −1.3 to 2.4). Patients recruited in Asia exhibited a higher risk of serious infections (hazard ratio, 1.78; 95% CI, 1.03–3.06). The incidence of human anti-human antibodies was <5%. Long-term follow-up indicated no differences in malignancy rates between the treatment groups. There was no apparent difference in time to B-cell repletion between the OCR dose groups. Conclusions In placebo-controlled clinical trials of RA, OCR500+MTX was associated with a higher risk of serious infections compared with placebo +MTX. The safety profile of OCR 200+MTX was comparable with placebo+MTX. Trial Registration STAGE Clinical Trials.gov NCT00406419 SCRIPT Clinical Trials.gov NCT00476996 FILM Clinical Trials.gov NCT00485589 FEATURE Clinical Trials.gov NCT00673920 PMID:24498318

  10. The Stratospheric Aerosol and Gas Experiment III instrument proposed for EOS - A conceptual design

    NASA Technical Reports Server (NTRS)

    Mauldin, L. E.; Mccormick, M. P.; Zawodny, J. M.; Mcmaster, L. R.; Chu, W. P.; Gustafson, J. C.; Maddrea, G. L.

    1989-01-01

    This paper describes the Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument proposed for the Earth Observing System (EOS), which is designed to monitor the vertical distribution of stratospheric aerosols, ozone, water vapor, nitrogen dioxide, and temperature by measuring the extinction and scattering of solar radiation in the 03 to 1.6 micron range through the atmosphere. The SAGE III employs proven concepts which have evolved from the SAM II, SAGE, and SAGE II programs. The launch is scheduled for the summer of 1996. The SAGE II block diagram is included.